WorldWideScience
 
 
1

Steam turbine-service. Upgrading the low-pressure steam turbines in the Emsland nuclear power plant; Dampfturbinen-Service. Wirkungsgrad verbessernde Massnahmen im Kernkraftwerk Emsland  

Energy Technology Data Exchange (ETDEWEB)

A century of technical development put steam turbines on a high level regarding efficiency and reliability. This procedure is still ongoing. The technological-commercial point of view - influenced intensively by liberalisation of the energy-market - makes great demands on field services. Well suited concepts in service and modernization are the solutions, as shown in NPP Emsland upgrade. [German] Ein Jahrhundert technischer Entwick lung brachte Dampfturbinen auf ein hohes Niveau bezueglich Effizienz und Zuverlaessigkeit. Dieser Vorgang ist auch in der heutigen Zeit nicht ab geschlossen. Die technologisch-wirtschaftliche Betrachtungs weise '' von der Liberalisierung des Strommarktes intensiv beeinflusst '' stellt dementsprechend hohe Anforderungen auch an den Kraftwerksservice. Massgeschneiderte Modernisierungs- und Servicekonzepte sind die Antwort, wie das Beispiel Kernkraftwerk Emsland zeigt. (orig.)

2001-07-01

2

Operating experience with Alloy 800 SG tubing in Europe  

Energy Technology Data Exchange (ETDEWEB)

'Full text:' In Germany, Alloy 800 (high nickel austenitic stainless steel) was modified and qualified for the use as steam generator tubing by Siemens/KWU (now AREVA NP GmbH). The service reliability of Alloy 800 has been demonstrated over a long period of time. 1968 Siemens/KWU decided to use this material for the NPP Stade, which started operation in 1972. The steam generators operating with Alloy 800 tubes have now been in service for more than 30 years. Up to now no PWSCC or secondary-side SCC has been observed in the more than 285,000 tubes installed in Siemens/KWU steam generators (including RSG) in 19 PWRs in Europe. The operating experience will be shown and discussed. During the past regular SG tubing inspections using eddy current testing, a few indications were detected within the tube sheet between upper and lower tube expansion. These indications were limited to the outer tube positions. The number of affected positions is small. Two ...

2007-07-01

3

Operating experience with Alloy 800 SG tubing in Europe  

International Nuclear Information System (INIS)

'Full text:' In Germany, Alloy 800 (high nickel austenitic stainless steel) was modified and qualified for the use as steam generator tubing by Siemens/KWU (now AREVA NP GmbH). The service reliability of Alloy 800 has been demonstrated over a long period of time. 1968 Siemens/KWU decided to use this material for the NPP Stade, which started operation in 1972. The steam generators operating with Alloy 800 tubes have now been in service for more than 30 years. Up to now no PWSCC or secondary-side SCC has been observed in the more than 285,000 tubes installed in Siemens/KWU steam generators (including RSG) in 19 PWRs in Europe. The operating experience will be shown and discussed. During the past regular SG tubing inspections using eddy current testing, a few indications were detected within the tube sheet between upper and lower tube expansion. These indications were limited to the outer tube positions. The number of affected positions is small. Two tubes had been ...

2007-08-19

4

Decommissioning, safe enclosure, and dismantling licensing for nuclear power plants according to section 7 subsection 3 of the Atomic Energy Act. Die Stillegungs-, Einschluss- und Abbaugenehmigung fuer Kernkraftwerke nach Paragraph 7 Abs. 3 des Atomgesetzes  

Energy Technology Data Exchange (ETDEWEB)

The contribution is concerned from a legal point of view with the systematic recording, classification and assessment of specific problems concerning the post-operational phase of a nuclear power plant. As an introduction, present experience with decommissioning in the Federal Republic of Germany is dealt with. The first part treats the factual side of section 7 III AtG, explains the terms mentioned, the concrete extent of licensing and priority relations. In part 2 the preconditions for licensing pursuant to section 7 III AtG are dealt with, the stipulations of which are made difficult in particular on account of the reference in section 7 III sentence 2 AtG. The third part is concerned with the legal consequence of section III AtG, i.e. the extent of official discretionary powers, whereby aspects of radioactive waste management carry great weight. In part four administrative and procedural particularities in the legal sense relating to licensing according to section III AtG are ...

1990-01-01

5

Modernizing steam turbines for nuclear power plants; Modernisierung von Dampfturbinen fuer Kernkraftwerke  

Energy Technology Data Exchange (ETDEWEB)

Economic and safe operation of nuclear power plants requires reliable steam turbines with high efficiencies. The progress in flow mechanics achieved over the past few years has allowed the use of powerful methods of flow calculation in developments of new blading with greatly enhanced efficiencies. Thanks to the latest manufacturing techniques, the newly developed blading systems can be produced at low cost. Next to progress in flow mechanics, also the broadbased use of advanced finite-element calculations resulted in a more thorough grasp of the many problems associated with structural mechanics assessment of steam turbine components. The theoretical methods have been supplemented by comprehensive efforts in fracture mechanics and experimental materials studies, thus helping to create a reliable knowledge base which will help to avoid the dreaded stress corrosion cracking phenomenon, in components of steam turbines. The measures introduced to improve operational reliability already in ...

1996-01-01