The R and D were carried out of a detecting system for measurement of data on the bottom of geothermal well, data transmission and signal processing, and an analysis system for well drilling trajectory control and well assessment while geothermal well drilling based on the data obtained by the detecting system. The paper reported the results of the technology development in fiscal 1996. In the development of the detecting system, improvement/design were conducted on a mud pulse generator constituting sonde, well bottom signal processing equipment, mode switch and inclined information sensor, and the system equivalent to the actual one was manufactured to conduct a running test at high temperature/pressure. Moreover, a test to confirm heat resistance of electronic parts was made for further improvement in heat resistance of the sonde, in order to obtain the data. In the development of an analysis system, conducted were enhancement of operability of the planning/indication portions of ...
It is necessary to establish scenarios for reducing CO2 emissions and for developing CO2 emission control technologies to obtain a global consensus, using appropriate analytical models. For modification of the DNE-21 (Dynamic New Earth 21) model, it has a category designated as innovative technologies not involving CO2 emission and an optional consideration for the absorption of atmospheric CO2 by biomass. A global carbon circulation model, including vegetation in its scope, is also incorporated. Major results of the simulation are shown. When 20% reduction in CO2 emissions is required for only OECD countries after the year 2020, it has been demonstrated that CO2 concentration in the atmosphere will reach as high as about 900 ppm in 2100 due to CO2 emission by developing countries, and will not be a tolerable level. Under the condition that CO2 concentration in the atmosphere is controlled at 450 ppm in 2100, the amount of renewable source of energy from photovoltaic power generation ...
The feasibility study was conducted on a model project in Vietnam, aimed at solving the environmental pollution problems resulting from use of coal by demonstrating and disseminating the Japan's environmental technologies in the Southeast Asian countries. The feasibility study was conducted for the Cua Ong Coal Preparation Enterprise, which has the largest coal preparation capacity in Vietnam and port facilities. It is treating raw coal from 10 coal mines for classification and preparation, and shipping coal of various types that meet the standards for domestic use and export. The survey results point out that unrecovered coal remains in waste water discharged from the coal preparation plants to pollute the sea area, and that quantity of the refuse increases because of the unrecovered coal it contains. The environmental technologies needed to introduce include modification to variable wave pattern type jigging separator, refuse height measuring instrument and automatic ...
The effects on engine emissions resulting from the intake manifold fumigation of oxygenated fuel and the addition of oxygenates to the fuel have been investigated using a direct-injection diesel engine. The results show that carefully selected oxygenated fuels effectively work to increase the ignition delay because of their low ignition quality and to decrease the combustion temperature due to the low compression gas temperature produced from their large heat of vaporization, thereby reducing levels of Bosch smoke and nitrogen oxides simultaneously. However, supplementary injection of the oxygenates into the intake air causes a drastic increase in the levels of exhaust total hydrocarbons and CO; thus, it can be said that the addition of oxygenates to the fuel is more practical and effective than fumigation if phase separation of the blended fuel may not be occurred. In the case of addition of the oxygenates to the fuel, it is clarified that smoke is directly related to the oxygen ...
An approximate solution was proposed in which a sensitivity analysis by the storage and release of heat was performed for the subject issues and in which an operating method was thereby determined for the equipment constituting the system by means of a linear programming. Accordingly, a heat storage type energy supply system for a district cooling and heating was taken up as a concrete object to be examined. This system consisted of a gas turbine generator, initial power receiving equipment, gas boiler, electric heat pump for ice heat storage, cooling tower, heat exchanger, steam absorbing refrigerating machine, ice heat storage tank, cold and warm water heat storage tank, etc. As a result of comparison between the proposed method and the resolving method, the former showed -0.92 to 2.58% in the increase in the operating cost compared with the latter. A case where the operating cost of the resolving method was sometimes larger than the proposed method was due to the resolving method ...
For the purpose of digging up themes of the joint research which develop the R and D in the industrial technology field in Japan to a new stage, researchers were sent to the world representing research institutes to conduct the research survey of 'Nano-structured carbon and hydrogen absorption' and 'Development of the creation technology of nano-porous materials.' As to the former, an experiment on electrochemical hydrogen absorption of carbon materials including nanotubes was conducted by researchers dispatched, but the large absorption amount was not observed. As to the latter, visits were paid to Fraunhofer Institute and the related facilities in Germany, Princeton University, MIT, GIT and Naval Research Laboratories in the U.S., Orleans University in France, AO Research Institute (bone repair study) in Switzerland, Cambridge University and University of Bristol in the U.K., etc., and the research survey was made on the technology for making ...
For the purpose of proposing it to ISO, the R and D were conducted of a new evaluation method of thermal properties of polymer materials. The FY 1999 results were summarized. In this fiscal year, the development of the ac Joule heating equipment was proceeded with based on the study at the technical committee, and the measuring device was installed. In the comparative measurement with conventional methods, study was proceeded with of the laser flash method, AC calorimetry method and specific heat measurement. In the technical survey, the developmental state of the ac method, especially, was examined as a testing method of thermal properties of polymer materials. It is in the stage of the basic research by keyword selection, and the search for literature is to be made in full scale. As to the needs in the industrial circle, as a result of the questionnaire survey made, it was found out that there were a wide variety of the needs for general-purpose/functional film materials, forming ...
The paper reported the results of fiscal 1994 studies on solar energy in the New Sunshine Project. Relating to the technical development for the practical use of photovoltaic power systems, the development of manufacturing technologies for low-cost substrates and the development of element technology for manufacturing low-cost polycrystalline cells/modules were reported as the development of technology for thin substrate polycrystalline solar cells for practical use. As to the research on fabrication technology for thin film solar cells for practical use, reports were made on the research on low-cost fabrication technology for large-area modules and the technological development for qualitative improvement, etc. In respect to the technological development for super-high efficiency solar cells, reported were the technological development for super-high efficiency single crystalline silicon solar cells and the technological development for crystalline compound solar cells, etc. ...
This paper describes a Honshu-Shikoku linking transmission cable building plan and its technical features. The Chugoku District and the Shikoku District are supplied with power currently by the Chugoku-Shikoku trunk line of 220,000 volts. To cope with the anticipated power shortage, a plan was established to install power cables for 500,000 volts on the Honshu-Shikoku connecting bridge. The plan calls far an installation length of 127.4 km and a transmission capacity of 1.2 million kW per line. The cable installation on the Seto Bridge was completed already, the construction is now in the peak period for building steel towers on the land sections, and laying overhead cables and underground cables. Commencement of the operation is scheduled 1994 on one liner, and 2000 on two lines. The technical features include the Japan's first large-capacity, long-distance underground transmission cable installation, and the installation of the multi-conductor overhead cables having ...
Out of the R and D of mesoscopic metal group composite materials, the paper described the fiscal 1997 results. In the in-situ method as a composite material making method, elucidated to some degree were chemical composition of Fe-C-Cr-V-Nb-Mo-W-Ni base multi-dimensional alloys, and wear resistance and oxidation resistance of MC type carbide dispersion multi-phase texture crystallizing as primary crystal and eutectic. In the composite material making with ceramic fiber and alloy by the pressure infiltration method, the paper clarified the texture formation mechanism in solidification/heat treatment by a combination of Al alloys and alumina long fiber, and the relation between fiber configuration and wear resistance. By MA and MG methods as the powder metallurgy composite material making method, a composed body of {alpha}-stainless steel of Fe-12%Cr composition and M23C6 of 40-90vol% are designed for alloy composition, and powder of amorphous or hyperfine texture was fabricated. By hot ...
A geothermal heat pump-assisted heating system is introduced into Changchun City and a survey is conducted to determine if the system may be popularized in this extremely cold region located in the northeastern part of China. In concrete terms, the hot water that circulates through the office building of Changchun Ground Heat Development Co., Ltd., is switched to hot water prepared by a geothermal heat pump. The test continued from December 2000 to March 2001. It is then concluded that heating by geothermal heat pumps will be fully serviceable to Changchun City. Implemented are (1) the shift from the coal fired boiler system to a geothermal heat pump system comprising 16 subterranean heat exchangers for the heating of the office building which is approximately 1000 m{sup 2} large, (2) long-term monitoring of the operating conditions, (3) measurement of subterranean heat exchanger thermal conductivity and subterranean temperature, and (4) the study of pipe shapes for improved thermal ...
In order to serve for efficient energy utilization and environmental improvement in the Republic of Vietnam, a 'Model project to reduce electric power consumption at cement burning plant' has been implemented. This paper summarizes the achievements. This project is intended to add an advanced, matured and reliable electric power generation facility using cement waste heat to the existing cement plant in Vietnam to produce steam and generate power by utilizing the waste heat generated from the preheating process in the burning plant. The present project has performed the detailed designing on the piping, electric facilities and instrumentation based on the basic agreement on the project. Fabrication of the piping has been executed by the Vietnam side. Valves and electric devices were procured and transported, including those fabricated in the previous fiscal year. Technology guiding personnel were sent for unpacking inspection, installation construction, trial ...