WorldWideScience
 
 
1

Forecasting neutrino masses from combining KATRIN and the CMB: Frequentist and Bayesian analyses  

CERN Document Server

We present a showcase for deriving bounds on the neutrino masses from laboratory experiments and cosmological observations. We compare the frequentist and Bayesian bounds on the effective electron neutrino mass m_beta which the KATRIN neutrino mass experiment is expected to obtain, using both an analytical likelihood function and Monte Carlo simulations of KATRIN. Assuming a uniform prior in m_beta, we find that a null result yields an upper bound of about 0.17 eV at 90% confidence in the Bayesian analysis, to be compared with the frequentist KATRIN reference value of 0.20 eV. This is a significant difference when judged relative to the systematic and statistical uncertainties of the experiment. On the other hand, an input m_beta=0.35 eV, which is the KATRIN 5sigma detection threshold, would be detected at virtually the same level. Finally, we combine the simulated KATRIN results ...

2007-01-01

2

Plaadid / Mart Kalvet, Katrin Malt, Mart Virkus  

Index Scriptorium Estoniae

Uutest heliplaatidest Cry For Silence "The Glorious Dead", ETHS "Teratologie", Gun Barrel "Outlaw Invasion", King's X "XV"

2008-01-01

3

AAR in concrete of Asejire spillway (OYO state - Nigeria)  

Energy Technology Data Exchange (ETDEWEB)

The Asejire dam at Ibadan, Nigeria was constructed in the late sixties for the purpose of providing water for the city of Ibadan (presently about 4,5 million inhabitants). It is located on the Oshun river approximately fifteen miles from the city. In 1982 cracks were observed on the wing walls and although these continued to develop, no attempt was made at that time to investigate their causes and no repair was carried out. In 1989 the SGI ENGINEERING Group of Geneva, Switzerland was appointed as the consultant for the complete refurbishment of the Asejire water scheme. The consortium Degremont-Poat-Clemessy was awarded the contract for the project. The African Development Bank and the Nigerian Government have provided the loan to finance the project.

1995-12-31