The two tank (125,000kl each) foundations under construction are as large as 85m in diameter, and the north-side tank is to be placed over a sharper slope. The tanks are greatly different in their height from the rockbed since they are to be placed at the same level. For reduction in construction cost and time, a pile foundation design is chosen as the basic concept for foundation construction. After an overall evaluation of stability upon exposure to seismic torsion and of the deformation characteristics of piles and concrete slabs, a total pile foundation design with rock debris replaced with crushed rock is determined to be the design to be adopted. Since the piles to be driven in are greatly different in length, error in the pile supporting force will be too grave under the conventional pile landing control system. Therefore, a high-accuracy pile landing control system is employed, established after a rapid load test in addition to the dynamic load test for the confirmation of the ...
The foundation is a key to safety of any structure built on reclaimed land in coastal areas. This paper gives examples of reclamation methods, ground improvement works, foundations adopted, and consequent land subsidence as for structures directly borne by the underlying ground. Structures built on the recently reclaimed land often stand on piles driven into gravel layers. But an emphasis in pile design in usually placed on bearing capacity, with little consideration given to land subsidence and its effects. Appropriate ground improvement works, if followed by an enough consolidation period, produce satisfactory results for both direct and pile foundations. Low and light structures can be more economically built on direct foundations. It will be still safer for those structures if floating foundations or other measures are taken for preventing increases in load. 5 refs., 16 figs.
A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power system and equalizing by durable years, the ...
At COP3 in 1997, an agreement was made to the innovative technical development/promotion by international cooperation, and the promotion of transfer of environmental technology to developing countries. Under the agreement, a feasibility study of international cooperation was made, and especially a study was conducted of the utilization/development of solar energy by the innovative solar thermochemical process. The main reason for global warming is emissions of a large amount of CO2 caused by the direct combustion of fossil fuels. Therefore, a CO2 recycle system taken up in the study enables a more substantial decline in CO2 emission (kg/kWh) per unit generation than the conventional thermal power system by composing solar methanol or solar dimethyl ether using fossil fuels including coal, water, CO2, etc. as raw materials and using solar energy as heat source, and by using this as fuel (solar fuel). CO2 can be reduced by 13% to 14% by substituting solar methanol or solar dimethyl ether ...
This paper introduces the summary of design guideline (draft) for the limit state design method for foundation structures, and examples of calculations on pile foundations. The limit states were set using the load to transformation curves, and the limit state No. 3 in particular assumed a large earthquake, a state that a foundation is fatally damaged because of rarely acting loads that lead to generation of displacement and loss of stability and functions. Ground survey coefficient, ground resistance coefficient, and ground property coefficient were defined especially as the safety coefficients. With respect to the displacement in the limit state No. 3, a restriction value was set for the plasticity of the foundation. Loads were given considerations of combination of permanent load, variation load, and accidental load, each having been set with a load coefficient. It was decided regarding earthquakes to discuss strength and toughness of members, displacement of structures, and ...
Method is proposed for expanding the pile foundation elastic analysis method (displacement method) to cover a larger displacement region, and its appropriateness is verified by a field test. In this report, stability calculation is discussed in which the present displacement method is expanded by assuming an equivalent plastic hinge on the pile head and by replacing the soil spring in the large displacement region with an equivalent linear elastic spring. A static horizontal loading test is conducted for a foundation using a real pile, which is an application of this method. On the assumption that a hinge is generated on the pile head, the pile spring constant of the current displacement method is replaced with a value that takes into consideration the plastic hinge region, and this enables the analysis of pile behavior even after breakdown. This method is applied to the result of a loading test using a real foundation, and it is found that it can roughly simulate the real relationship ...
With respect to concept of resolution in seismic exploration using the reflection method, detailed considerations were given on processes of forming the resolution as a result of arranging observation points at vibration transmitting and receiving points. In the discussion, numerical experiments were carried out, in which the scattering stacking process is applied in a model having one scatterer existing in homogeneous media. The experiments investigated an imaging formation process of the scatterer when arrangement of the vibration transmitting and receiving points were changed from a coarse condition to a dense condition while the number of transmitting and receiving points is being increased. Resolution is created if waveforms having finite frequencies are used as input, and the imaging is performed by utilizing the limited number of vibration receiving and transmitting points. If the concept of equi-travel plane is used under these conditions, the equi-travel planes perform ...
In order to clarify the alkali-resistance of fibers to be utilized as reinforcing materials for concrete, such as glass fiber, Aramid fiber, and carbon fiber, accelerated aging tests in alkaline solution were conducted. In detail, the degree of degradation of the fracture strength and Young's modulus were investigated through static tensile strength tests after soaking in alkaline solution of these fibers and then the mechanism of degradation was examined by observation using a scanning electron microscope. The conclusion obtained was as follows. Glass fiber was easily degraded in the alkaline solution and the progress of degradation was simulated quantitatively by the method proposed in this paper, which was based on a diffusion theory. Both Aramid fiber and carbon fiber showed a significant alkali-resistance without degrading. The reaction of glass fiber with alkaline solution proceeded uniformly from the surface of glass fiber into the inner direction with passage of time. ...
Anisotropy has been investigated using S-wave as a technique for detecting fractures. In this study, fundamental experiments were carried out with slightly changing the measuring conditions at a place where anisotropy was expected. This paper describes the fundamental data acquisition of anisotropy analysis using S-wave, and a part of the results. The experiments were conducted on the agricultural road in Yamadera district, Matsuyama-machi, Yamagata Prefecture. Two flat unpaved roads meeting at right angles were used as traverse lines. In this place, several reflection surfaces were certainly detected by P-wave, and anisotropy of S-wave was confirmed from the velocity of refracted wave of S-wave. Data were processed for individual traverse lines meeting at right angles. Firstly, signal sweeping, correlation, and vertical superposition were made. Six kinds of data were prepared, i.e., three-component receiving records of data at 0{degree} of generating direction and three-component ...
When the foundations of the building are designed and worked, the prediction calculation of immediate settlement of the building exercised practically is to calculate assuming the earth is a linear elastic body, but the actual stress-strain relationship of the earth is nonlinear and rigidity of the earth becomes lower as strain (or stress) increases. Hence in order to grasp the actual settling behavior of the earth, it is necessary to elucidate the nonlinear relationship between stress and strain. In this article, a prediction method of building settlement is introduced which uses an analytical technique of the multi-layered earth by the linear elasticity theory and takes into consideration strain dependency of rigidity of the earth. Part of the conclusion is as follows which has been obtained by studying the settling behaviors observed in examples of vertical loading tests of the pile foundations and the elasto-plastic settlement analytical method of the pile foundations; the settling ...
Substation machinery foundation works have some features such as a number of work cases second look cases in design, and so forth. The Tohoku Electric Power Co., Inc. started the development of a system generally supporting the substation machinery foundation design to practical use the Engineering Work Station (EWS) introduced to the civil engineering department as a part of improvement of management efficiency. At first, rigid foundation design support system (TRAD) and slab foundation design support system (KANSAS-IN) automatically conductible with from preparation of design and amount calculation sheet to preparation of design drawing was developed, which was began to operate since March of 1996. As a result, the rigid foundation design became able to execute fully automatic works from preparation of design and its drawing to amount calculation. And, on the slab foundation design, three dimensional FEM analysis could be executed for shorter time, which made wide range of time ...
Deformation of the ground can be considered as a sum of volume deformation and shear deformation. At circumferential ground of pile axis, simple shear type of shear deformation becomes main factor of settlement. As shear forces with reverse direction are overlapped at parallel face for pile around face of the ground between the piles, the shear deformation is relaxed. At deeper place from top of the pile, volume deformation becomes larger and component of shear deformation approaches to a pure shear type. In case of the land surface loading type consolidation settlement calculation, a method adopting one dimensional consolidation calculating method using only vertical component within stress obtained by elasticity theory even when investigating multi dimensionally is used widely. In Japanese design standards, the method calculating the consolidation settlement by presuming imaginary loading face for land surface is widely adopted. In case of abrasion pile, the imaginary loading face is ...
Petropavlovsk-Kamchatky (P-K) city in Kamchatka, Russia is operating hot-water district heating using heavy oil boilers and waste hot water of thermal power plants as heat sources. Feasibility study was made on district heating using natural geothermal hot water and/or geothermal heat pump systems as heat sources of hot water supply for reduction of greenhouse effect gas emission. Among 3 areas including geothermal hot water, use of hot water in K area was impossible because of lower temperature and less spring water. Use of hot water in P and UP areas was impossible as primary hot water because of temperature drop to 64 degrees C during hot water supply toward P-K city. The building heating operation test was carried out using the geothermal heat pump system installed in a newly drilled heat exchange well of 100m deep. As a result, sufficient heat recovery was achieved for heating. If all of 49 boiler houses for heating are replaced with such geothermal heat pump systems, CO{sub 2} ...
For large transmission steel towers to be built in a mountainous area, caisson type pile foundations are often applied. The works for construction of this kind of foundation are manned operations such as drilling, arranging reinforcements, concrete laying, etc. in a narrow vertical pit which is 3m in diameter and about 20m in depth, but securing labour force of good quality for such works becomes increasingly difficult. In order to cope with the above situation and achieve reduction of costs, shortening of construction period, improvement of safety, saving of manpower, etc. a power supply company and construction companies have developed jointly a method of unmanned construction in a caisson type pile foundation pit. This method consists of the use of a caisson type pile full size excavator (this consists of an excavator proper, a vacuum soil discharging device, a monitor/controller, a load crane and a reaction pad, and performs continuously unmanned operations in a pit of fullsize ...