Two 40 MWe Ocean Thermal Energy Conversion (OTEC) Pilot Plant programs are in the initial phase of development near Kahe Point, Oahu, Hawaii. The two options being examined are: (1) a shelf-seated artificial island, connected via a causeway to Oahu, using stainless steel heat exchangers, with the thermal resource enhanced by effluent from a near-by power plant, ammonia working fluid and biocide (chlorine) cleaning; and (2) a shelf mount tower 1 mile off shore using submerged aluminum heat exchangers, R-22 working fluid, and slurry cleaning with biocide (chlorine) backup. Environmental Technical Requirements are described including: siting criteria; environmental design, and operational criteria; thermal resource evaluation and variability; physical, chemical, and biological data requirements; and regulatory requirements. Due to siting, design, and operational differences the proposed two pilot plant options have individual environmental monitoring criteria and ...