There are a total of nine operational nuclear plants in Spain totalling 7.350 MWe. These units produced 54.265 x 106 KWh in 1990, 36% of the total generation in Spain. Seven of these plants are of the PWR type. The first plant in operation was JoseCabrera (ZORITA) in 1968, one loop Westinghouse plant with a model 24 Steam Generator. Due to the design margin and careful operation of the Steam Generator of this plant its performance have been very good, with only 5% tubes plugged after 23 years of operation. This is one of the few units in the world that remains in phosphate chemistry. During the period 1981-1985 a total of four units, two in Almaraz and two in Asco entered in operation. These three loop s Westinghouse units use model D-3 preheater Steam Generators. The poor design and manufacture of the Steam Generators of these units have caused a large number of problems: mechanical (Preheater and AVB's vibration), ...
Sep 12, 1975 ... POCKET CALCULATORS. Jose P. Olivares 35, Robert B. Clowns and ... of pocket calculators and has an- Washington to arrive by Nov. 20. ...
A study was undertaken to determine experimentally the uptake of pollutants into of the different parts of the water hyacinth (Eichhornia crassipes) found in 'Jose Antonio Alzate' dam in the State of Mexico, Mexico. There is evidence for efficient and significant root accumulation of Ti, Mn, Fe, and Ba; but in the upper parts concentrations was consistently determined by the degree of watering. However, a significant input could be derived from a common generic source, such as the atmospheric deposition. The experimental study would, therefore, indicate that water hyacinth species can be highly effective in providing a control and treatment buffer for toxic discharges to the dam. (author)
I travelled to San Jose, Costa Rica on July 8, 1990 to evaluate all of the completed elements of the ongoing feasibility study for the San Lorenzo River hydroelectric project. The feasibility study is being supported by ORNL under the Renewable Energy Applications and Training Project. The project is being studied for implementation by CONELECTRICAS, a consortium of rural electric cooperatives and the study itself is being conducted by BEL Engineering, a Costa Rican consulting firm under contract to CONELECTRICAS, USAID/PIC and NRECA.
The summertime tropical cyclogenesis rate per unit area in the eastern Pacific ocean is arguably higher than in any other location in the world. Many if not most of these cyclones form from African easterly waves which cross Central America into the Pacific. Of order 25% of these waves intensify into cyclones. A significant fraction of east Pacific tropical cyclones undergoes landfall on the Mexican coast. Those which do not, generally dissipate over cold ocean waters north of the east Pacific intertropical convergence zone, often not far from land. The layer of warm ocean water which supports the development of east Pacific cyclones is unusually shallow and is structured by anticyclonic vortices which form by various processes and propagate slowly to the west. These vortices locally deepen the oceanic mixed layer and support stronger convection than their surroundings, possibly promoting cyclogenesis and cyclone intensification. Cyclones in turn have an unusually large effect on ...
The data center in this study had a total floor area of 8,580 square feet (ft{sup 2}) with one-foot raised-floors. It was a rack lab with 440 racks, and was located in a 208,240 ft{sup 2} multi-story office building in San Jose, California. Since the data center was used only for testing equipment, it was not configured as a critical facility in terms of electrical and cooling supply. It did not have a dedicated chiller system but served by the main building chiller plant and make-up air system. Additionally, it was served by a single electrical supply with no provision for backup power. The data center operated on a 24 hour per day, year-round cycle, and users had all hour full access to the data center facility. The study found that data center computer load accounted for 23% of the overall building electrical load, while the total power consumption attributable to the data center including allocated cooling load and lighting was 30% of the total facility load. ...
The data center in this study had a total floor area of 3,024 square feet (ft{sup 2}) with one-foot raised-floors. It was a rack lab with 147 racks, and was located in a 96,000 ft{sup 2} multi-story office building in San Jose, California. Since the data center was used only for testing equipment, it was not configured as a critical facility in terms of electrical and cooling supply. It did not have a dedicated chiller system but was served by the main building chiller plant and make-up air system. Additionally it was served by only a single electrical supply with no provision for backup power in the event of a power outage. The Data Center operated on a 24 hour per day, year-round cycle, and users had full-hour access to the data center facility. The study found that data center computer load accounted for 15% of the overall building electrical load, while the total power consumption attributable to the data center including allocated cooling load and lighting was ...