In Daya Bay and Ling'ao Nuclear PowerStation, the Microgovernor has the control functions such as synchronization, block loading etc. The control principle of the Microgovernor is right described by sequence diagram for the first time. That the fault occurred in the synchronization process of Daya Bay Nuclear PowerStation unit 1 is also analyzed and illustrated. (author)
Stretch-Out and Extended Low Power Operation is two particular operating modes applied for nuclear electricity generation. The relevant safety analysis and the impacts on plant operation are well illustrated, as well as some operation experiences earned in Daya Bay nuclear powerstation. The safety analysis and plant practice show that Stretch-Out operation and Extended Low Power Operation are operable in Daya Bay nuclear powerstation
This report documents the operation, maintenance, calibration, data acquisition and data reduction at the Chalk Point Meteorological Station for the period November 15, 1978 through November 15, 1979. Climatological data summaries for each month and calib...
For the first time in China, Daya Bay Nuclear PowerStation applied the advanced technology of worldwide commercial pressurized reactors to the in-core detectors, the leading excore six-chamber instrumentation for precise axial power distribution, and the related data processing. Described in this article are the neutron flux measurement in Daya Bay Nuclear PowerStation, and the detailed data processing.
The in-core reload design procedure, computer codes, design contents and comparison between expected design values and measured values for Daya Bay Nuclear PowerStation are presented. The in-core reload design for Daya Bay Nuclear PowerStation performed by Nuclear Power Institute of China satisfies the requirements of safety and economy. The expected design values are fit well with measured values
After that power fluctuations had occurred at Borssele nuclear powerstation it was decided to install a power system stabilizer. This stabilizer shall reduce the unwanted power fluctuations. The preliminary research and the results of measurements carried out during commissioning are described. (J.C.R.)
This report gives the results of a survey of operational flue gas desulfurization (FGD) systems on coal-fired utility boilers in the United States. The FGD systems installed on Units 1 and 2 at the Bruce Mansfield Station of the Pennsylvania Power Company...
During the operation of Daya Bay Nuclear PowerStation, some little branches of secondary system were with great vibration and even some of them cracked due to the great vibration that may cause some effect on the safety of the powerstation. This paper performed analysis and evaluation to the eight systems of Daya Bay Nuclear PowerStation based on the vibration test results from the examination of the safety during ten years, and the list of the sensitive piping and suggestion for modification were presented based on the analysis results. (authors)
Both the accuracy and real-time are quite strictly required for the RCS thermal-hydraulic model of the simulation of nuclear powerstation. So, a large amount of reasonable simplifications should be carried on. The author introduces the RCS thermal-hydraulic model of the full scope simulator of Daya Bay Nuclear PowerStation, and emphasizes on the fundamental hypotheses and computation method of its kernel part--DEFI programme.
In the market economy, Daya Bay Nuclear PowerStation needs to out source or allow to suppliers among industries, while concentrating its core competitive capability, for safely and stable operation. By evaluating the features of contract management in Daya Bay Nuclear PowerStation, set up the organization and process of the supply management
By way of introduction, the author describes the electrical equipment of the powerstation on the River Traun and then lists the main features of the electrical systems such as generators, transformers, the power transmission systems as, e.g., the generator leads, the 8 kV switch plant, the 110 kV oil-filled cable as well as the station-service, control, protection and monitoring systems. The control of the headwater level and of the mechanical systems of the barrage is described in detail.
The human causal factors for all human error licensing operational events on Daya Bay nuclear powerstation since 1993 to 2003 are categorized, the trend of these causal factors is analyzed. The emphasis is placed on analyzing the deficiencies on complying with and executing regulations and procedures. The results provide directional reference for nuclear powerstation to improve human performance. (author)
Physicochemical and benthos data were collected from 12 marine monitoring stations in Daya Bay, during 2001-2004. 12 stations in Daya Bay could be grouped into three clusters: cluster I consisted of stations in the southern part of Daya Bay (stations S1, S2 and S6); cluster II consisted of stations in the cage culture areas (stations S3, S4, S5 and S8); cluster III consisted of stations in the southwest, the middle and the northeast of the Bay (stations S7, S9, S10, S11 and S12). Calculation with bivariate correlations between benthos and major physicochemical factors showed that the density of benthos in all stations correlated positively with temperature, DO, pH, NH4-N, SiO3-Si, SiO3-Si /PO4-P and chlorophyll a and was negatively correlated with salinity, Secchi, COD, NO3-N, ...
For the conversion of thermal energy into electric energy in modern condenser power plants, according to the way of steam generation, two different types of powerstations are built: powerstations for fossile fuels and nuclear powerstations. Also two classes of steam turbines were developed, corresponding to the two powerstation types, whose steam conditions, by experience and extensive calculations of economy, were determined so that a minimum of power generating cost will result. The two classes, the HMN and the SN series, are composed according to the modular system and designed in such a manner that with a small number of standard components, steam turbines for the power range between 100 and 2,500 MW can be built. (orig.).
The fuel management study on 18-months fuel cycle project is introduced for Daya Bay Nuclear PowerStation. Station from the selection of the objective of fuel management for 18-months cycle, the method used and the analysis done are explained in detail to reach the final loading pattern chosen
Inputs on radiological conditions forms the basis of implementation of effective exposure control to plant personnel in nuclear powerstation. Radiation monitoring system provides this input to the plant operator as well as to health physics group. Several design modifications have been incorporated in the Radiation Monitoring System at Tarapur Atomic PowerStation (TAPS 3 and 4) over the similar systems at Kakrapar Atomic PowerStation (KAPS) and Kaiga Generating Station (KGS). The radiological monitoring systems installed at TAPS unit 3 and 4 includes on line Radiation Data Acquisition System (RADAS), Emergency sampling system, effluent monitoring system and environmental monitoring system. The design changes and the versatile use of these systems are presented in this paper. (author)
The development of a high power density sodium sulphur battery with a five-year maintenance-free life is described. These batteries are likely to be used in industrial trucks, milk floats, electric cars, storing powerstation output and power for satellites. (U.K.).
The report gives results of a survey of the flue gas desulfurization (FGD) systems at Kansas Power and Light Co.'s Lawrence PowerStation. The systems utilize boiler injection of pulverized limestone, followed by tail-end wet scrubbing: unit 4, with a net...
Daya Bay Nuclear PowerStation is the largest joint-venture project which is also the largest commercial nuclear power plant currently under construction in China mainland. Organized and executed strictly in accordance with international standards, the Daya Bay project is seen as the first step taken by China in the development programme of large-capacity commercial nuclear power units.
Aerosol and gas measurements were made with the University of Minnesota Mobile Laboratory (UMML) during the VISTTA programme near Page, Arizona. The UMML was stationed on Zilnez Mesa approx. 65 km east of the Navajo coal-fired power plant. Measurements were made both in and out of the power plant plume and were made during the day and night. Measured parameters included aerosol size distributions, Aitken nuclei count, ozone and sulphur dioxide concentrations, the aerosol light scattering coefficient, and meteorological parameters including ultraviolet radiation intensity. Concentrations of NO and NO/SUB/x were occasionally measured. Data show clear evidence of gas-to-particle conversion in the plume with aerosol volume being added in the 0.01 MUm - 0.32 MUm dia. range and new particles being formed. The observed excess aerosol volume depends strongly upon the SO/SUB/2 concentrations and the time of day with none observed in ...
The full scope simulator in Daya Bay Nuclear PowerStation is imported from THOMSON-CSF company in France. It is a large facility, using digital simulation technology, that simulate the main control room of Daya Bay Nuclear PowerStation with the high fidelity. It is used for training operators; system analyzing including operation procedure verification. The input output interface system of the simulator is the bridge of the information exchange between instrumentation and the computer. From the point of view of data transfer, this paper discusses the operation principle of the I/O interface system.
By its very nature redox potential measurement is suitable for determining the concentration ratio of a stable redox pair through its interaction with a chemically inert electrode surface but not the absolute concentration of a material. The measured redox potentials agree only rarely with those which are easily calculable theoretically. No individual defined stable redox pair is available in powerstation water. It is therefore not simply possible to measure definable mixed potentials more precisely. For these reasons redox potential measurement in the powerstation, as also with other types of water, can no longer be regarded as an indicator, by which it can be established whether oxidizing or reducing materials predominate in the water.
By its very nature redox potential measurement is suitable for determining the concentration ratio of a stable redox pair through its interaction with a chemically inert electrode surface but not the absolute concentration of a material. The measured redox potentials agree only rarely with those which are easily calculable theoretically. No individual defined stable redox pair is available in powerstation water. It is therefore not simply possible to measure definable mixed potentials more precisely. For these reasons redox potential measurement in the powerstation, as also with other types of water, can no longer be regarded as an indicator, by which it can be established whether oxidizing or reducing materials predominate in the water. (orig.).
The report gives results of a survey of the flue gas desulfurization (FGD) systems at Kansas City Power and Light Co.'s Hawthorn PowerStation. The FGD systems on Hawthorn boilers 3 and 4 were designed to operate by injection of dry limestone in the boile...
Daya Bay Nuclear PowerStation has made a series of tries and efforts on radiation source control and benefited from them since it was put into commercial operation. Some of them were introduced from experience feedbacks of foreign nuclear power industry and others came from our own good practices
Korea Electric Power Corporation (Kepco) of South Korea has awarded Asea Brown Boveri Switzerland, a member of the ABB Group, a contract to supply the main equipment for two gas-fired combined-cycle powerstations. News of the contract followed an announcement last year that Kepco will build a series of gas-fired powerstations in the early 1990s to supply electricity to new housing and commercial areas being built in the Seoul-Incheon connurbation. (author).
Taiwan`s LNG consumption is planned to rise more than threefold over the next four years as medium-term plans to develop power generation facilities increasingly rely on gas-fired combined-cycle stations to avoid the threat of power shortages. State-run Taiwan Power Company (Taipower) expects its LNG consumption to rise from 1.1 mn tonnes in 1996 to 3.4 mn tonnes in the year 2000. By then the first of several gas-fired private powerstations is expected to enter service, further increasing Taiwan`s total LNG requirement for power generation. (Author)
equipping the trio of SPHERES on the space station with a Nexus(tm) S handset made by Samsung Electronics and powered by Google's Android(tm) platform. graphic for the NASA mobile...
The results obtained from experimental investigations and mathematical simulation of horizontal steam generators are considered. Recommendations for continuing these works are given.
Eight units (low-power model Z-12's) were purchased, all for installation at continuously- operating stations in the Los Angeles prototype Dense GPS ...
Data on various aspects of the electric power industry in Germany is presented in this article. A map of high voltage transmission lines used by the public utilities is included, which indicates the fuel used at each powerstation. Data on power generated by fuel used from 1991 to 1996 is given, and additional or new capacity for 1995 to 1999 is also noted. Other tables detail capital investment in public utilities energy input by fuel source, power capacity by utility or private powerstations by energy source, utility ownership and electricity demand by consumer. (UK)
System instability as result of high power generation of one of the largest plants of the Iranian electric power grid prevented the plant to be fully utilized. PSSs were installed on the generating units of the powerstation, to improve its small signal stability, and enhance the stable generation limit. Domain separation and pole assignment techniques were applied for the PSS design. Several field tests were also carried out to verify its effectiveness. This paper presents the PSS tuning procedure, including the design criteria and some of the field test results.
After 3 years of construction the trial run of the heating powerstation HKW 2 ended in November 1997 on time. No extraordinary damage occured during construction, assembly or commissioning. The plant has been operating according to schedule since November 1997. A brief inspection carried out in the summer of 1998 in order to assess warranty claims showed no damage to any part except one valve. Experience shows that all aforementioned activities were necessary. The paper reports about success and negative experience. Certification according to DIN EN ISO 9000ff., however, affords to guarantee of high-quality construction. Builders of such plants therefore need to set up their own quality assurance centre and ensure its technical competence. If necessary,additional experts should be called in.Quality assurance costs for HKW 2 came to about 0.5-0.6 percent of total costs. In view of the success and long life of this investment these expenses are ...
The paper discusses the potential environmental impacts associated with the operation of a large, say 350 MWe, gas-fired combined cycle powerstation. It concludes that if appropriate control methods are introduced at the design stage of the plant, environmental impacts are minimal and can be considered acceptable. (author).
The authors report the individual monitoring data management system (IDOSE) at Daya Bay Nuclear PowerStation. The components of the individual monitoring system, the design requirements of IDOSE, the characteristics and application of this computerized management system are mainly presented. Its application shows that IDOSE meets the requirements of the concerning occupational standards of the state and matches with the requirements of IAEA/ISOE.
This report presents criteria for the identification and evaluation of fire hazards in nuclear powerstations. The report presents criteria that are consistent with the existing regulatory approach in Canada, and outlines engineering tools and analytical techniques currently available to deterministically analyse fire. The criteria presented cover the topics which should be included in a fire hazard analysis and provide details of each topic so that the accuracy of an analysis may be evaluated.
The report gives results of a second survey of the flue gas desulfurization (FGD) system on Unit 1 of Kansas City Power and Light Co.'s La Cygne Station. The FGD system, first started up in February 1973 and commercially available in June 1973, uses a lim...
In combined cycle turbine powerstations, soft material compensators are used which, if the full pressure fails, also withstand a small external pressure. Innovative forms of construction which guarantee useful life, are presented in relation to the design. Damaging effects, which limit the life of these special soft material compensators, are discussed. (orig.)
With the frequent load changes to which a hard coal powerstation is subjected in the middle and peak load range, great demands are linked with the transient behaviour of the steam generator. Due to the serial connection of the crusher and boiler, the strongly delaying transient behaviour of the crusher compounds entirely with the transient behaviour of the steam generator. Therefore, a suggestion is to be made here as to the improvement of the dynamics of the crusher.
This article introduces the composition, monitoring methods and working principles of environmental #gamma# dose rate continuous monitoring system at Guangdong Daya Bay Nuclear PowerStation. The #gamma# dose rate monitoring status after modification of measurement conditions is introduced too.
According to the practice operation experience of the outdoors electrical equipment in Guangdong Daya Bay Nuclear PowerStation, following to the engineering technical standard applied in China, by analysis and assessment of pollution classes, it is considered that the class four is reasonable. And indicated the voltage distance should be more than 3.5 cm/kV. Some improvements had been executed and effects are good. And further suggest some improving comments
In view of the widespread cracks discovered in the reinforced-concrete circulating water culvert of Daya Bay Nuclear PowerStation, cause analysis for the cracks is made in terms of construction and design. It is concluded that the cracks mainly resulted from shrinkage and temperature. Corresponding countermeasures are put forward thereafter for reference of similar projects
The early accident Sequence of the Station Blackout accident is simulated for Daya Bay Nuclear Power Plant, using MELCOR code. The radioactivity of main fission products was derived after calculating the source term in containment. The data will be used for Daya Bay NPP PSA analysis
This document is the Final Report for the project Introduccion de Mejoras Tecnologicas en el SISCOM II, or Improvements in SISCOM II Technology. It consists of a brief description of the activities carried out during the project, and several Annexes that explain in a deeper way each result. SISCOM II is the main telemetry system currently in use in the Spanish underground coal mining, but it was developed ten years ago and needed a technological update, which was the objective of this project. The aims of the project were: To develop Hardware and Software for the Out stations currently used (maintenance developments) To design new hardware and software, easier to use in the current and new applications of SISCOM II Both objectives were met, although not in the way originally intended. The main results were: In the field of old Out stations update: A new set of ...
National Power is building its first gas turbine combined cycle powerstation at Killingholme, situated to the south of the River Humber in the East of England. NEI ABB Gas Turbines Limited was awarded the turnkey contract in July 1990 to build a nominal 650 MW combined cycle powerstation based around three Asea Brown Boveri GT13E gas turbines. The project is outlined in this article. The plant is due for completion in July 1993. (author)
The author describes feasibility study on the scheme of disposing spent guide tubes at Daya Bay nuclear power plant, including scheme selection, packing cask design, disposal operation and technological process, budget estimation and safety evaluation. The research results show that the new scheme is feasible on technology, and reasonable on budget. If the scheme is adopted to dispose the spent guide tubes at Daya Bay nuclear powerstation, it can not only save large funds, but also accumulate experience on disposing non-compressible low and intermediate level solid radioactive wastes produced at nuclear powerstation for the country
The report describes the following: overview of the Russian power industry; electric power equipment of Russia; power industry development forecast for Russia; clean coal technology demonstration program of the US Department of Energy; reduction of coal TPS (thermal powerstation) environmental impacts in Russia; and base options of advanced coal thermal power plants. Terms of the application of clean coal technology at Russian TPS are discussed in the Conclusions.
A submerged nuclear powerstation has been proposed as an alternative powerstation with a relatively low environmental impact for use by both industrialized and developing countries. The station would be placed 10 m above the seabed at a depth of 30--100 m and a distance of 10--30 km from shore. The submerged nuclear powerstation would be manufactured and refueled in a central facility, thus gaining the economies of factoryfabrication and the flexibility of short-lead-time deployment. To minimize the size of the submerged hull, horizontal steam generators are proposed for the primary-to-secondary heat transfer, instead of the more traditional vertical steam generators. The horizontal steam generators for SNPS would be similar in design to the horizontal steam generators used in the N-Reactors except the tube orientation is horizontal (the ...
A submerged nuclear powerstation has been proposed as an alternative powerstation with a relatively low environmental impact for use by both industrialized and developing countries. The station would be placed 10 m above the seabed at a depth of 30--100 m and a distance of 10--30 km from shore. The submerged nuclear powerstation would be manufactured and refueled in a central facility, thus gaining the economies of factoryfabrication and the flexibility of short-lead-time deployment. To minimize the size of the submerged hull, horizontal steam generators are proposed for the primary-to-secondary heat transfer, instead of the more traditional vertical steam generators. The horizontal steam generators for SNPS would be similar in design to the horizontal steam generators used in the N-Reactors except the tube orientation is horizontal (the ...
A submerged nuclear powerstation has been proposed as an alternative powerstation with a relatively low environmental impact for use by both industrialized and developing countries. The station would be placed 10 m above the seabed at a depth of 30--100 m and a distance of 10--30 km from shore. The submerged nuclear powerstation would be manufactured and refueled in a central facility, thus gaining the economies of factoryfabrication and the flexibility of short-lead-time deployment. To minimize the size of the submerged hull, horizontal steam generators are proposed for the primary-to-secondary heat transfer, instead of the more traditional vertical steam generators. The horizontal steam generators for SNPS would be similar in design to the horizontal steam generators used in the N-Reactors except the tube orientation is horizontal (the ...
Describes the wastes produced and the waste disposal methods used at BEWAG power plants. Wastes covered include fly ash, fluidized bed ash, gypsum from flue gas desulfurization and evaporation residues. Disposal methods include using ashes and gypsum to make building materials. Despite many years of experience in the utilization and disposal of residues from coal-fired powerstations BEWAG have not encountered any disposal problems. 5 tabs.
The regular inspection of No.2 plant in Sendai Nuclear PowerStation was carried out from January 7 to February 8, 1985. The summary of the results of this regular inspection is as follows. The facilities as the object of inspection were radiation control facilities and waste facilities. On these facilities as the object of inspection, the appearance, disassembling, functional, performance and other inspections were carried out, and as the results, abnormality was not found at all. The works related to this regular inspection were accomplished within the range of the allowable radiation dose based on the relevant laws. (Kako, I.).
This talk reviews the history of the Canadian nuclear-electric program highlighting Canada's first nuclear powerstation, the Nuclear Power Demonstration or NPD. NPD was commissioned and delivered electricity to Canadian consumers for the first time on june 4, 1962. The Canadian nuclear-electric program is based on the CANDU-PHW (Canadian Deuterium Uranium - Pressurized Heavy Water) concept which was conceived between 1955 and 1958 at the Chalk River Nuclear Laboratory (CRNL) of AECL, located a few miles from Deep River. This talk covers the history of the Canadian nuclear-electric activities dating back to 1939.
The fire protection practices adopted at nuclear powerstations generally follow the well established principles used throughout industry. Unfortunately, there is one particular area - the interaction with heating, ventilation and air conditioning (HVAC) services - where nuclear powerstations pose a seemingly insoluble conflict: that between the need to contain and the need to ventilate. Now, however, solid state fire dampers using power fluidics may promise a solution. One of the key characteristics of a fluidic device is that it is 'solid state', i.e. it has no moving parts. Because of this, its inherent reliability is orders of magnitude greater than a mechanical device. (U.K.).
On June 2, 1992, Landers` earthquake struck the Solar Electric Generating System II, located in Daggett, California. The 30 megawatt powerstation, operated by the Daggett Leasing Corporation (DLC), suffered substantial damage due to structural failures in the solar farm. These failures consisted of the separation of sliding joints supporting a distribution of parabolic glass mirrors. At separation, the mirrors fell to the ground and broke. It was the desire of the DLC and the Solar Thermal Design Assistance Center (STDAC) of Sandia National Laboratories (SNL) and to redesign these joints so that, in the event of future quakes, costly breakage will be avoided. To accomplish this task, drawings of collector components were developed by the STDAC, from which a detailed finite element computer model of a solar collector was produced. This nonlinear dynamic model, which consisted of over 8,560 degrees of freedom, underwent ...
The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Participating agencies included: Washington Department of Fisheries (WDF), Oregon Department of Fish and Wildlife, Idaho Department of Fish and Game, and the US Fish and Wildlife Service (USFWS). This is the final data report for the Augmented Fish Health Monitoring project. Data collected and sampling results for 1990 and 1991 are presented within this report. An evaluation of this project can be found in Augmented Fish Health Monitoring, Volume 1, Completion Report.'' May, 1991. Pathogen detection methods remained the same from methods described in Augmented Fish Health Monitoring, Annual Report 1989,'' May, 1990. From January 1, 1990 to June 30, 1991 fish health monitoring sampling was conducted. In 1990 21 returning ...
The Operation Technical Specifications is a document that is attached to the Operation License of a nuclear powerstation and its are applicable since the first load of fuel begins in the reactor core. This document is normative and with its application it is assured the safe operation of the nuclear powerstation. For the case of the Laguna Verde Nucleo electric Central this is documented in the Condition No. 5 of the License of Operation. Any modification to the ETOs is subject to the evaluation by part of the regulator organism. This work describes the regulator frame and the evaluation process of the Improved Technical Specifications on the part of the regulator organism. It is also indicated the implementation process of the improved ETOs and the main characteristics and benefits that are obtained of these processes to maintain the safety of the nuclear power ...
After a brief review of the degradations occurring on tubes of Inconel 600 in steam generators of PWR powerstations emphasis is put on the conditioning of the secondary water and more particularly on the condensate treatment in the units of Doel which work on heavily polluted brackish water. The important role of non-destructive testing and eddy-current testing is also pointed out, method developed by Laborelec. The operational experience shows that Belgian stations are nearly not concerned by the degradations mostly found in powerstations in other countries which shows the efficiency of the conditioning of the secondary water. On the other hand, other problems have occurred, resulting from: damage caused by foreign objects; fouling of tube before commissioning, cracking of bends and at the limit of the dudgeoning and leaking plugs. (AF).
Tarapur Atomic PowerStation, Unit 3 and 4 is located on the West Coast of the Arabian Sea near the existing Tarapur Atomic PowerStation Unit 1 and 2. The nearest railway station is Boisar at a distance of 12 km from the site, which is on the main Western Railway Mumbai-Delhi route. The site is well connected by road and is about 30 Km from Mumbai-Ahmedabad National Highway-NH-8. The paper describes the land acquisition and rehabilitisation of the affected families, importance of project in the western grid, how it works, working principles of PHWR, principle of operation, major components/equipment, important systems, safety features, and waste management
Personal monitoring and dose assessment of all radiation workers is an essential regulatory requirement as per radiation safety procedures of AERB and operating stations. The occupational workers of TAPS 1 and 2 and TAPS 3 and 4 are monitored for internal contamination due to high energy gamma emitters by whole body counting
The problems of the thermal stress in concrete structures are roughly divided into the initial stress due to setting heat and the stress due to external temperature after hardening. The initial stress exists in every concrete structure, and it is usually neglected in beams and columns, but it must be taken into account in case of the foundation mat structures in nuclear powerstations, for example. In this paper, (1) the results of measurement of temperature, strain and stress in each lift at the time of and after placing concrete in the foundation mat of a nuclear powerstation and the comparison of them with the results of analysis, (2) the results of measurement of the temperature and stress in a foundation mat, which was carried out to rationalize the design method for the raft type foundation mats in thermal powerstations, and (3) the results of ...
Historically, the bulk production of electricity has been achieved by burning fossil fuels, with unavoidable gaseous emissions, including large quantities of carbon dioxide: an average-sized modern coal-burning powerstation is responsible for more than 10 Mt of CO{sub 2} each year. This paper details typical emissions from present-day powerstations and discusses the options for their reduction. Acknowledging that the cuts achieved in the past decade in the UK CO{sub 2} emissions have been achieved largely by fuel switching, the remaining possibilities offered by this method are discussed. Switching to less-polluting fossil fuels will achieve some measure of reduction, but the basic problem of CO{sub 2} emissions continues. Of the alternatives to fossil fuels, only nuclear power represents a zero-carbon large-scale energy source. Unfortunately, public concerns over safety and ...
The deliveration by the Nuclear Safety Commission was commenced on the alteration in reactor installation, as it had been inquired by the Ministry of International Trade and Industry. The alteration is the additional installation of the reactor No. 2 in the Sendai Nuclear PowerStation, Kyushu Electric Power Co., Inc. It is a PWR power plant with thermal output of about 2,660 MW (electric output of 890 MW), to be installed, adjoining to the reactor No. 1 of the same type and capacity under construction. In the examination by MITI, it was confirmed that the technological capabilities for its construction and operation and the radiation protection measures in power generation are both sufficient. The contents of the examination include the siting conditions, the location and construction of reactor facilities, etc. (J.P.N.).
The deliberation by the Nuclear Safety Commission was initiated on the alteration in reactor installation, as was required by the Ministry of International Trade and Industry. The alteration is the additional installation of the reactor No. 2 in the Sendai Nuclear PowerStation, Kyushu Electric Power Co., Inc. It is a PWR power plant with thermal output of about 2,660 MW (electric output of 890 MW), to be installed, adjoining to the reactor No. 1 of the same type and capacity under construction. In the examination by MITI, it was confirmed that the technological capabilities for its construction and operation and the radiation protection measures in power generation are both sufficient. The contents of the examination include the siting conditions, the location and construction of reactor facilities, etc.
The long-term support required from Canada in the operation and maintenance of overseas CANDU nuclear generating stations after commercial operation has commenced is described, with reference entirely to the KANUPP reactor. This includes: technical support to station staff to increase plant reliability and maintainability; assistance with plant improvements; procurement of spares and consumables; and assistance with training programmes. This technical support may be provided by a small number of Canadian staff actually resident at the powerstation; by short-term visits of Canadian specialists to site and by technical and procurement services provided from Canada. Examples of technical problems experienced are given, showing typical services required from Canada.
Tohoku Electric Power Co., Ltd., is now building an LNG-fired No. 4 System (combined cycle of 1.61-million kW) for its Higashi Niigata Thermoelectric PowerStation sited in the Niigata East Harbor industrial zone. This is a unit that aims at a thermal efficiency of 50% first in the world by using high-efficiency gas turbines, etc. After the completion of the No. 4 System, the station (No. 1 Machine, No. 2 Machine; No. 3 System, No. 4 System; Harbor No. 1 Machine, Harbor No. 2 Machine) will be generating a total power of 4.6kW, providing the company with its maximum power source which ranks among the largest-grade thermoelectric powerstations in this country. Since the construction work was started in April, 1996, approximately 40% had been completed as of March-end, 1997, including foundations for the ...
In the summer of 1990, an accidental spill from the TA-3 Power Plant Environment Tank released more than 3,785 liters of sulfuric acid into upper Sandia Canyon. The Biological Resource Evaluation Team (BRET) of EM-8 at Los Alamos National Laboratory (LANL) has collected aquatic samples from the stream within Sandia Canyon since then. These field studies gather water quality measurements and collect macroinvertebrates from permanent sampling sites. An earlier report by Bennett (1994) discusses previous BRET aquatic studies in Sandia Canyon. This report updates and expands Bennett's initial findings. During 1993, BRET collected water quality data and aquatic macroinvertebrates at five permanent stations within the canyon. The substrates of the upper three stations are largely sands and silts while the substrates of the two lower stations are largely rock and cobbles. The two upstream ...
Electrical power is generated by steam turbines (steam being produced by coal, oil, gas or nuclear reactors), hydro units, gas turbines, internal combustion engines, jet engines, and pumped storage plants. Nuclear Power Plants generate only 15% of the total electrical power in the US. Nuclear Power Plants being cheaper to run are generally base loaded. The pumped-storage and gas turbine plants have ideal characteristics for peaking duty. In the pumping mode, pumped storage plants are used to provide additional system load and in the generating mode, they supply reactive power during peak load demands. Gas turbine plants have higher running costs, but are used as peaking units with a fast start capability. Fossil power plants need a minimum of 1 hour to stabilize expansion in the boiler and turbine generator. Due to a more competitive power ...
This report presents leaching experiments with irradiated fly ash from the Kozienice PowerStation and, as a reference, with a Czechoslovakian fly ash sample. 7 refs, 11 figs, 3 tabs.
The demand for cogeneration plants is growing worldwide. For the combination of electricity generation and heat extraction in powerstations facilitates an excellent fuel exploitation and makes the operator of the plant independent from external energy suppliers. (orig.)
A brief overview of the conceptual design of a solar central receiver system integrated with an existing cogeneration facility is provided. A synopsis of the performance and economic evaluation, and an assessment of the concept from the site owner's perspective are given.
... Austrian Environment Minister Nikolaus Berlakovich called for such stress tests on Sunday (13 March) to make sure that nuclear powerstations were quake-proof following Japan's massive earthquake and tsunami. Austria, a mountainous country rich in geothermal energy, has no NPPs and no plans to develop ...
Electric cars can be recharged via charging stations, battery exchange, or induction cable lanes in asphalted roads. The users' wishes remain unexplored, so a number of technologies are competing in this sector.
Use of geothermal resources for generating electricity is briefly analyzed. Results obtained from optimization of the thermodynamic cycle implemented in the secondary coolant circuit of a binary geothermal powerstation and the parameters of its primary heat carrier circuit are presented.
The main problems encountered during the operation of horizontal steam generators are considered. Design features of the new PGV-1000MK and PGV-1500 steam generators are analyzed.
Extensive investigations and detailed analysis of the failure reason of 9DVN002ZV fan in Daya Bay Nuclear PowerStation showed that the fan destroy was caused by the failure of non-drive end bear. The direct cause of this bearing' failure was its improper assembly caused by improper maintenance procedure, and the root cause was too small internal radial clearance after mounting. The factor affecting bearing internal radial clearance, the relationship between clearance and operating life time and fan failure process were discussed. (authors)
The author gives the historical development of steam-turbine construction in Europe since the turn of the century, and the technical further development of conventional turbines due to the increases in the steam parameters and per-unit outputs in the increases in the steam parameters and per-unit outputs in Europe and the USA. Marginal conditions for the development of turbines in nuclear powerstations with light-water reactors are mentioned. The rise in the per-unit capacities of the turbosets constructed in Germany and the USA for nuclear powerstations is discussed. Longitudinal sections through typical turbines are shown. The future development of turbines with high output is dealt with. (orig.).
Standard radiation monitoring has been conducted at Sendai nuclear powerstation for the purpose of estimation of 'source activity' during refueling outage and evaluation of countermeasures to reduce dose rate. Selected objects of the monitoring are radiation dose rate at maintenance area, radiation field at each equipment and piping, coolant chemistry and plant operation condition. Monitored data indicates that 'source activity' variation can be estimated to some extent using influential factors, and that evaluation of change of loose crud activity, which is presumed to be represented by the dose rate at letdown heat exchanger, is necessary to further explain change in radiation field at main work area. (author).
The invention concerns a solar powerstation with a hollow solar heater, which has reflected radiation coming in, focussed by a mirror through the inlet opening. To match the differing solar radiation during the day, the inlet opening can be adjusted by changing its cross-section. This is done by at least two thick flat circular parts which can move relative to each other which are preferably movable relative to each other in pairs on a common rail and which are cooled by a coolant which is the working medium for absorbing solar energy.
The 2nd periodical inspection was carried out on the asphalt solidification facility and the incinerator in Unit 2 of the Sendai Nuclear PowerStation from November 5 to 28, 1985. Inspection was made in radiation control facility and disposal facility. By external appearance, disassembly, function and performance tests there were observed no abnormalities. The personnel exposure doses during the inspection were below the permissible level. In the inspection, improvement etc. works were not done. (Mori, K.).
This paper describes a system for biogas conversion to electric power and heat by using a micro turbine and three Otto cycle engines. The benefit of the energy from a treatment process residue aims the improvement of the global performance of the system, reducing the the emission of the greenhouse gases and contributing to the global energetic efficiency of the sewage treatment station and the basic sanitation in Brazil.
The use of pre-dehumidified air having widely established itself as a safe and economical conservation method during the stoppage of steam turbines, it was obvious that this method would be applied also to steam boilers and ancillary aggregates. Experience with the conservation of condensers, prheaters and the water/steam-side of steam boilers in large-scale powerstations is reported on. By the example of projects with topical interest, the problems and possibilities of boiler conservation on the firing side are illustrated. The contribution is to stimulate further discussions. (orig.).
Investigations were carried out of radiation level around Daya Bay for three times since the construction and operation Daya bay Nuclear PowerStation and Lingao Nuclear PowerStation in Guangdong province in the period of 1988 to 2000. As shown by the investigation, the radiation levels both in the field and indoors remains unchanged by and large but slightly higher than before on the roads. Also this paper gives the analysis of variations in radiation levels form site to site and from time to time. It was shown that, for environmental ? radiation levels measurements, typical measuring sites have significant impact on the meaning results. (authors)
The accident assessment under emergency situation includes the accident status evaluation and its consequence estimation. This paper introduces evaluation methods for accident status and its assistant computer system (SESAME-GNP) utilized during the emergency situation in Guangdong Daya Bay Nuclear PowerStation (GNPS) in detail. At the same time, an improved accident consequence estimation system in GNPS (RACAS-GNP) is briefly described. With the improvement of the accident assessment systems, the capability of emergency response in GNPS is strengthened
The scenario of the development of a new procedure for cutting out the broken protective wells for thermocouples inside the deep holes in the tube plate in the moisture re-heater (MSR) at Daya Bay nuclear powerstation is presented. Focused in the innovation and improvement of the self-made tools, the new procedure produced an effective method to cut out swing long inserts stuck inside the deep holes. (authors)
The circulating cooling water flowrate of GNPS and LNPS is totally about 190 m"3/s. Both stations are located on the western coast of semi-closed Daya Bay. A lot of studies concerning thermal impact of GNPS and LNPS have been carried out since 1987, including mathematical model, physical model, on-site survey and satellite remote sensing, etc. This paper describes the hydrological features of Daya Bay and discharge characteristics of circulating water of GNPS and LNPS, estimates the actual thermal impact of GNPS and LNPS, and indicates that it is advantageous for the dilution of circulating water while the two discharge channels of GNPS and LNPS are combined together towards east
The Nuclear Safety Commission acknowledged the policy of the Agency of Natural Resources and Energy to cope with these important matters on August 8, 1984. The main contents of the investigation and deliberation were as follows, As to the prevention of the occurrence of fires, the prevention of the leak and spread of inflammable liquid and gas, the installation of protective relays and so on, the use of incombustible materials and aseismatic design and the installation of lightning arresters. As to the detection of fires and fire fighting, the proper selection and arrangement of fire detectors and extinguishers, the extinguishers which do not harm the safety function of structures and equipment, and the extinguishers which are not affected by natural phenomena. As to the reduction of the effect of fires, the proper installation of fire walls and extinguishers, and the high temperature shut off of nuclear reactors which is never hampered by any fire. (Kako, I.).
Development of the Conawapa-Winnipeg power transmission complex in Manitoba includes five interrelated transmission and conversion facilities. Environmental and socio-economic assessment work done to date on one component of this system (the upgrading of the Southern Receiver System) is described. This system is composed of a network of high voltage transmission lines and station facilities serving power demand in Winnipeg and southern Manitoba. The upgrading involves three main elements: energizing a second 230 kV ac circuit on an existing tower line running from the proposed Riel Station site to the existing St. Vital Station; constructing a new double-circuit 230 kV tower line on the same existing right-of-way between St. Vital and the Riel site area; and installing an additional transformer and other necessary equipment at St. Vital and other stations ...
Aug 15, 2002 ... In Section II, we describe the routing and transceiver power model used ... In our power model, we assume a certain non-zero minimum level of ...
...competent person shall inspect haulage equipment before each shift. (ii...used. (2) Powered mobile haulage equipment shall have suitable means of... (3)(i) Power mobile haulage equipment, including trains, shall...
The supply of electronic instrumentation and controlling (I and C) equipments in Daya Bay Nuclear PowerStation depends on importation up to now, however, reliable supply of spare parts is presently threatened by many factors. Consequently, Daya Bay Nuclear PowerStation tries to localize these equipments. According to a survey, China has possessed the ability to undertake the research, development and production of the I and C system in nuclear power independently. We propose that localization should firstly starts with the production of replacement board and parts for analogical I and C system, gradually leads to the substitution of system cabinet units, and finally realize the independent research, development and production of advanced digital main control system. A series of prominent problems of producing nuclear grade I and C equipments are focused on the designing, ...
Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear powerstation has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear PowerStation (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 ...
Topics related to aerospace power are discussed, taking into account trends and issues of military space power systems technology, space stationpower system advanced development, the application and use of nuclear power for future spacecraft, the current status of advanced solar array technology development, the application of a parabolic trough concentrator to space stationpower needs, life test results of the Intelsat-V nickel-cadmium battery, and metal hydride hydrogen storage in nickel hydrogen batteries. Other subjects explored are concerned with alternative fuels, biomass energy, biomedical power, coal gasification, electric power cycles, and electric propulsion. Attention is given to an advanced terrestrial vehicle electric propulsion systems assessment, fuel cells as electric propulsion ...
For the safety of astronauts and to ensure the stability and integrity of the genome of microorganisms and plants used in bioregenerative life support systems, it is important to improve our knowledge of the combined action of (space) radiation and microgravity. The SOS-LUX-TOXICITY test, as part of the TRIPLE-LUX project (accepted for flight at Biolab in Columbus on the International Space Station, (ISS)), will provide an estimation of the health risk resulting from exposure of astronauts to the radiation environment of space in microgravity. The project will: (i) increase our knowledge of biological/health threatening action of space radiation and enzymatic DNA repair; (ii) uncover cellular mechanisms of synergistic interaction of microgravity and space radiation; (iii) provide specified...
One of the five projects selected for funding within the Clean Coal Technology Program is a project proposed by the Pennsylvania Electric Company (Penelec) of Johnstown, Pennsylvania. Penelec proposes to enter into a cooperative agreement with DOE to design, construct and operate a 600 ton-per-day, 66-megawatt (MWe), coal-fueled, externally-fired combined cycle (EFCC) electric power generation facility. The EFCC is an emerging technology with promise for operating highefficiency combined gas- and steam-turbine cycles on coal. The central feature of EFCC is its coupling of the gas turbine to an external, atmospheric-pressure, coal combustor via a hightemperature ceramic heat exchanger (CerHx{reg_sign}) developed by Hague International. The EFCC technology is attractive because, unlike competing combined cycles such as Integrated Gasification (IGCC) and Pressurized Fluidized Bed Combustion (PFBC), it eliminates the need for a costly gas cleanup system to protect the ...
The information in this Final Environmental Statement is the second assessment of the environmental impacts associated with the construction and operation of the Grand Gulf Nuclear Station, Units 1 and 2, located on the Mississippi River in Claiborne County, Mississippi. The Draft Environmental Statement was issued in May 1981. The first assessment was the Final Environmental Statement related to construction, which was issued in August 1973 prior to issuance of the Grand Gulf Nuclear Station construction permits. In September 1981 Grand Gulf Unit 1 was 92% complete and Unit 2 was 22% complete. Fuel loading for Unit 1 is scheduled for December 1981. The present assessment is the result of the NRC staff review of the activities associated with the proposed operation of the Station, and includes the staff responses to comments on the Draft Environmental Statement.
This paper reports that at present geothermal energy is utilized in the USSR mostly for district heating, and for industrial and agricultural purposes. The populations of 7 towns have district heating that is supplied by thermal waters. The population supplied totals about 125,000 people. The total area of greenhouses is 850,000 m"2. Electric energy generated at geothermal powerstations still remains negligible with the installed capacity of the single Pauzhetka station (Kamchatka) being 11 MW. another station at Mutnovka is currently under construction and is expected to be producing 50 MW by 1992 and 200 MW by 1998. The proven geothermal resources in the USSR provide hope for a significant increase in the utilization of the earth's deep heat in the near future.
In this paper, probabilistic safety assessment (PSA) of the station blackout (SBO) and 5th emergency diesel in Daya Bay NPP has been carried out, the calculation method of non-recover factors of power supplies is given, and sensitivity analysis on the connection duration of 5th emergency diesel has been executed. It is concluded that the core damage frequency (CDF) induced by SBO is relatively large, the addition of 5th emergency diesel is very helpful for the CDF reduction, and the connection duration of this diesel has great effect on the CDF reduction
This paper was produced as an input to the Swiss Confederation's 'Electricity Perspectives 2035' study made by the Swiss Federal Office of Energy (SFOE). A concept for the combined use of wood and natural gas in a combined-cycle powerstation is presented. The gasification of wood to provide fuel for the gas turbines and waste-heat boilers of such powerstations is proposed as an alternative to just burning wood to provide heat for steam generators. Figures are quoted on the quantities of biomass and wood usable for energy applications in Switzerland. The energetic and financial efficiencies of wood-powered generation of heat and electricity are examined, as are the investments necessary and the costs incurred. Comparisons are presented between wood from forests, sawmill-wastes, scrap wood and natural gas as fuels.
Supplement 2 to the Safety Evaluation Report for Mississippi Power and Light Company, et. al, joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson, in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report.
Role of microelements in coal in connection with their combustion in powerstations, gasification and hydrogenation is discussed from the standpoint of environmental pollution and effects on technological parameters. In the wastes from fossil-fuel powerstations there are biogenic and toxic elements (Be, B, Pb, etc.) present, which eventually go into the soil. Analyses showed that coal from the Kuznetsk, Donetsk, Ehkibastuz and Kansk-Achinsk basins which are used for power, have a relatively low level of biogenic and toxic microelements, e.g. Ba, B, Mn, Pb, Co, Ni, V, Cu, Y. Coal reactivity in gasification and hydrogenation is discussed. The catalytic effect of several microelements in coal gasification and hydrogenation is established. A geochemical multiplicative indicator is presented which makes quantitative evaluation of the suitability of coals for hydrogenation possible. 17 ...
The Wolsung-1 CANDU 600 MWe plant is now in operation. This paper provides an update on the design, construction and commissioning progress reported at last year's conference. The accomplishments of the past year are highlighted with emphasis on how the station has been commissioned in preparation for commercial service and on the skills that were dedicated to the completion of the project. The paper also deals with some of the features of the CANDU 600 MWe Nuclear Power Plant that make it viable for export.
A survey was conducted of experience with steam generator tubes at nuclear powerstations during 1976. Failures were reported at 25 out of 68 water-cooled reactors. The causes of these failures and the repair and inspection procedures designed to cope with them are summarized. Examination of the data indicates that corrosion was the major cause of steam generator tube failures. Improvements are needed in steam generator design, condenser integrity and secondary water chemistry control. (author).
These proceedings compile the papers presented at the international conference (1988) sponsored by IEEE Council on ''Robotics and Automation''. The subjects discussed were: automation and robots of nuclear powerstations; algorithms of multiprocessors; parallel processing and computer architecture; and U.S. DOE research programs on nuclear power plants.
This paper introduces an occupational exposure information system in detail, which is developed and in operation presently by Daya Bay nuclear power plant. It is presented in the paper that individual dose monitoring items and method, design and classification of database configuration, statistics and analysis of individual dose, and management of staff entering and exiting controlled area. The system is instructive to analysing individual dose and optimizing radiation protection measures. (authors)
In the year 2008, the high pressure partial turbine and two low pressure partial turbines in the hard coal powerstation Bergkamen (Federal Republic of Germany) were modernized. A three-dimensional blade design and innovative seals were used. This resulted into a distinct increase in efficiency among other things.
This illustrated booklet describes the fission process; the use of uranium to produce power in nuclear powerstations (and a brief explanation of the differences between the principal types of reactor); the formation of plutonium and fission products; radioactive wastes and their management; nuclear fusion and a conceptual fusion reactor; alpha, beta and gamma radiations; radioisotopes and their applications. (U.K.).
18-Months cycle reload design verifications of Daya Bay NPS is briefly described. It was attempted giving the description of analysis scope and key technology for a nuclear power plant which will be changed fuel management strategy from one year to 18-months cycle
Collective dose equivalent and population dose from occupational exposures in Japan, 1988 were estimated on the basis of a nationwide survey. The survey was conducted on annual collective dose equivalents by sex, age group and type of radiation work for about 0.21 million workers except for the workers in nuclear powerstations. The data on the workers in nuclear powerstations were obtained from the official report of the Japan Nuclear Safety Commission. The total number of workers including nuclear powerstations was estimated to be about 0.26 million. Radiation works were subdivided as follows: medical works including dental; non-atomic energy industry; research and education; atomic energy industry and nuclear powerstation. For the determination of effective dose equivalent and population dose, organ or tissue doses ...
Collective dose equivalent and population dose from occupational exposures in Japan, 1988 were estimated on the basis of a nationwide survey. The survey was conducted on annual collective dose equivalents by sex, age group and type of radiation work for about 0.21 million workers except for the workers in nuclear powerstations. The data on the workers in nuclear powerstations were obtained from the official report of the Japan Nuclear Safety Commission. The total number of workers including nuclear powerstations was estimated to be about 0.26 million. Radiation works were subdivided as follows: medical works including dental; non-atomic energy industry; research and education; atomic energy industry and nuclear powerstation. For the determination of effective dose equivalent and population dose, organ or tissue doses ...
This paper presents a practical design for a power system stabilizer using the differential geometric linearization approach. This stabilizer uses the information at the secondary bus of the step-up transformer as input signals, enabling its application to multi-machine power systems. The stabilizer makes it possible to obtain all necessary information within its own powerstation without observing an equivalent reactance in other power systems. To evaluate the dynamic performance of this stabilizer, the authors tested it on a multi-machine system model using the computer. The simulation results showed that the stabilizer offered good dynamic performance and robustness compared with conventional power system stabilizers, thus confirming its very effective and practical application in power system stabilization.
The present volume on energy and the environment discusses space power requirements, space power systems, space power systems hardware, space radioisotope systems, space solar arrays, space solar cells, space stationpower, and terrestrial applications of aerospace technology. Attention is given to NASA future space power requirements and issues, the design of a battery charger for the NASA EOS Space Platform, in situ carbon dioxide fixation on Mars, and a preliminary design update of the CRAF/Cassini Power Subsystem. Topics addressed include concentrator testing using projected images, solar power satellites and demonstraton platforms from nonterrestrial materials, a mass sensitivity analysis of lunar orbiting beam power systems, and a power-beaming-based infrastructure for ...
In Aug 2002, the National Nuclear Safety Administration of China issued the policy statement for building new nuclear power plants, which requires the probability based safety goal of severe core damage must be lower than 10"-"5/a. The station blackout accident would be possible to cause a severe accident if there were no effective engineering measures to prevent or mitigate the consequences of the accident. By using MELCOR1.8.5 and KORIGEN codes, the present paper has simulated the station blackout accident for Daya Bay Nuclear Power Plant and calculated the source term and radioactivity of main fission products in the containment in the late phase of the accident. CsI is found the main part of aerosol in the containment. The Xe133 and Xe133m start releasing from the containment after its failure, and the upper limit of the amount of released radioactivity is evaluated less than 5.5 x 10"1"5Bq. The ...
This paper begins with an introduction to Guangdong Daya Bay Nuclear PowerStation (GNPS) and gives a simple introduction to the operations and maintenance documentation system at GNPS. It then will review the maintenance program guidelines base and the associated problems prior to the application of reliability centered maintenance (RCM). How RCM was implemented at GNPS, how the results of RCM analysis were used to optimize the maintenance program and test program, and what is the interface between RCM and the existing maintenance program will be shown. Next, it will show the successful implementation of RCM at GNPS resulted in the following changes: A new understanding of equipment failure challenges operations and maintenance beliefs, maintenance concepts undergo a large change, maintenance program and periodic testing program are continuously modified and optimized, new on-condition maintenance technologies are introduced, non-productive ...
BWRs are so designed that the exhaust steam from main steam safety relief valves is led to pressure suppression pools, and the steam is condensed in pool water, but at this time, dynamic load seems to arise in the pool water. In Tokai No. 2 PowerStation, a Mark-2 containment vessel was adopted to improve the reliability as much as possible and to obtain the design with margin. In this report, the result of actual machine test in Tokai No. 2 PowerStation and the method of reducing the load are described. When a relief valve works, the discharge of water in exhaust pipes into a suppression pool, the exhaust of air in exhaust pipes and repeated expansion and contraction of bubbles in pool water, and the exhaust of steam and condensation occur. As for the construction of the suppression pool in Tokai No. 2 PowerStation, cross-shaped quencher and the structure ...
Industrial companies are being forced by increasingly restrictive environmental legislation to implement powerstation technology which is environmentally compatible and which conserves scarce resources. Gas and steam turbine powerstations have been causing a sensation in this field for some time. This article gives an introduction to gas and steam turbine powerstations in the 4 MW to 30 MW size range. The designs of the plants described here not only provide for electricity generation by gas and steam turbines however, but also designs specific to particular companies for process steam and district heating supply. (orig.) [Deutsch] Durch immer restriktivere Umweltschutzgesetze werden die Industrieunternehmen zu einer umwelt- und ressourcenschonenden Kraftwerkstechnik gedraengt. Auf diesem Gebiet sorgen nun seit geraumer Zeit GuD-Kraftwerke fuer Furore. In ...
Large capacity adjustable speed machines (ASMs) at pumped storage powerstation have been put into full operation and the operating characteristics of ASM have been highly evaluated from the view point of power system operation. The output power (input power) of ASM can be controlled very quickly by applying a vector control scheme to the excitation control. This quick responsive feature of ASM can make it possible to improve the stability of the neighbor sub-power system. For improvement of transient stability, the output power of ASM is reduced very quickly in order to control the acceleration of neighbor generators during and after transmission line faults. For improvement of dynamic stability, the output power of ASM is modulated in accordance with the stabilizing signals detected from the swing of generator rotor or ...
The chemical operational concept originally established for the water-steam circuit of Angra II nuclear power plant has undergone several modifications throughout the development of the project. This work discusses the two main modifications giving special attention to the costs involved and analyses the main points and the consequences of such modifications 1 ref., 4 figs., 2 tabs.
Voestalpine AG (Linz, Austria) produces heavy steel for steam turbines, compressors for the promotion of oil and gas as well as for the chemical industry, mechanical engineering and for the offshore technology. A weight range between 1 and 200 tons can be covered. The author of the contribution under consideration is limited to characteristics which have to be managed by a large steel foundry within the range of the steam power plants. This is described on the basis of produced steam turbines for powerstations in the highest performance segment (1,600 MW).
Purpose: In a case of automatically controlling the water level at the time of generating a lower power, to impact the followability of the control necessary for the power variation of the steam generator thereby to obtain good controllability. Constitution: A signal of deviation of water level of a steam generator and its set value and a signal of a difference between the temperature of the primary coolant in the high temperature side pipeline and that of the primary coolant in the low temperature side pipeline are used to automatically or manually control the flow quantity of water fed to the steam generator. (Yoshihara, H.).
Power supply ripple at frequencies of 720 Hz and its harmonies is expected to affect the motion of particles in the collider. These ripple frequencies are nearly resonant with the betatron frequencies. To estimate the tolerable ripple levels, we have tracked particles through the complete nonlinear lattice for 10[sup 4] turns with ripple fed from 10 different powerstations and including up to 7 different ripple frequencies. We presently estimate that relative ripple amplitudes must be below the 10[sup 8] level for there to be no significant impact on the emittance over the short term.
Power supply ripple at frequencies of 720 Hz and its harmonies is expected to affect the motion of particles in the collider. These ripple frequencies are nearly resonant with the betatron frequencies. To estimate the tolerable ripple levels, we have tracked particles through the complete nonlinear lattice for 10{sup 4} turns with ripple fed from 10 different powerstations and including up to 7 different ripple frequencies. We presently estimate that relative ripple amplitudes must be below the 10{sup 8} level for there to be no significant impact on the emittance over the short term.
Measurement of fission and activation products in the soil or over a plane grass land of a nuclear powerstation environment is required to find out the long term changes. The inventory of radionuclides in the soil is routinely determined by soil sampling, processing and gamma spectrometry in the laboratory. The method although is proven and accurate is time consuming and largely dependent on homogenous distribution. Therefore, an alternative and rapid method of in-situ gamma spectrometry using portable devices was standardized to determine the concentration of radionuclides in soil, for regular environmental monitoring as well as during emergency condition. The paper presents the methodology, ready to use factors and compares the results of a few measurements made in the environment of Tarapur Atomic PowerStation by both in-situ and laboratory methods. (author)
In the context of the special research area 561 (Thermally highly loaded, open-porous and cooled multi-layer systems for combined-cycle powerstations), the actual technical and scientific realizations are to be extended and new scientific bases are to be created in order to realize total efficiencies of 65 %. In addition, innovative material solutions and new concepts must be compiled for the cooling and drainage. Under this aspect, the author of the contribution under consideration reports on the development of open-porous multi-layer systems for steam turbines of the 700 C technology. It results an efficiency potential of 12 % and a potential of 15 % with the reduction of CO{sub 2} in relation to the actual state of the art. Thereby, the potential of future combined-cycle powerstations is not yet exhausted.
This paper introduces the radioactive effluent monitoring systems, measurement and quality control methods used in Daya Bay Nuclear PowerStation from its commercial operation in 1994. The main work and experiences for the management of effluent release are discussed and analyzed. The radwaste data appear declining trend and are far blow the annual limit approved by the national Environmental Protection Bureau since 1995. The normalized release (unit GBq/GWa) of 9 years is as follows: liquid nuclides (except tritium) 11.1, liquid tritium 1.91 x 10"4, noble gas 2.03 x 10"4, halogen 0.13, aerosol 7.57 x 10"-"3. For "1"1"0"mAg, the average release from 1998 to 2002 has been reduced to 1/7 of the quantity in 1997
The main points of quality control methods and technique of environmental radiological baseline study of Guangdong Daya Bay Nuclear PowerStation are reported. Results of intercalibration of international and inland laboratories are given. The random chosen samples are checked and compared with two measurement methods. The data obtained in Daya Bay environment are put to the correlation statistics test using the linear regression analysis method between the correlative items such as "4"0K activity by gamma spectrum measurement and potassium content by chemical analysis, total #alpha#(#beta#) activity and nuclide content, as well as environmental gamma radiation dose rate and TLD accumulation dose. The data of Daya Bay environmental radioactivity baseline level show good concordance and reliability.
This is a process for producing calcium sulfate dihydrate during desulfurization of stack gases from powerstation boilers, where the stack gases are introduced into a washing tower and are treated with a washing water suspension containing lime in the washing tower, where oxygen in the form of air or of air enriched in oxygen is also blown into the washing tower, and where the washing water suspension drawn off from the washing tower is fed back to the washing tower at a temperature of 45 to 50/sup 0/C in the circuit and at least part of the flow goes via a thickener and where calcium sulfate dihydrate slurry is drawn off from the thickener.
Tata Electric Companies (TEC) are engaged in the generation of hydro and thermal energy. TEC, to minimise backing down of its thermal units in off peak hours and also to at least partially meet the growing deficit in the supply during peak hours is moving to install pumped storage plants (PSPs) utilising off-peak surplus energy for pumping the water from lower pond to the upper pond for subsequent utilisation for power generation during peak hours. In view of some of the infra structural facilities such as storage ponds, water conductor system, transmission lines, etc. being already available, at the existing hydro powerstations owned by TEC, the pumped storage units are being proposed within the environs of existing hydro stations, i.e. a 150 MW pumped storage unit at Bhira and a 90 MW pumped storage unit at Bhivpuri. The projects are described and cost estimates is given. (author). 2 figs.
Fly ash from Lagisza powerstation with addition of kaolin and calculated amount of carbon was reacted in flowing nitrogen at 1520"oC in order to obtain #beta#-sialon. The resulted powder was sintered with and without Y_2O_3 addition. Examinations show that it is possible to sinter that material without any sintering additives, however additive of Y_2O_3 decreases sintering temperature of about 100"oC. Sintering temperature influences the final mechanical properties like: flexural strength, microhardness, Young elastic modulus (E) and fracture toughness (K_I_c). (author)
The Institute of Electrical and Electronic Engineers (IEEE) standards for the quality assurance requirements for the design and manufacture of Class 1E instrumentation and electric equipment for a nuclear power generating station are presented. This standard establishes Quality Assurance Program requirements for electrical manufacturers. This standard, used in conjunction with ANSI N45.2-1977 and the supplemental standards to the extent referenced in this standard, is intended to meet the requirements of 10CFR50, Appendix B. These requirements are intended to assure that Class 1E instrumentation and electric equipment are responsibly engineered and manufactured from proper materials, that the manufacturing processes and practices are controlled, and that the manufacturing process produces a product of the required quality for Class 1E application.
Sizewell B is Nuclear Electric's latest powerstation, and the Pressurised Water Reactor (PWR) design on which it is based represents a ''first'' for the UK. One of the integral components of the plant is the heating, ventilation and air-conditioning (HVAC) system, which performs a contamination control and gaseous waste management function for the site. During the commissioning of Sizewell B PowerStation the extract systems of the HVAC plant underwent a procedure known as ''fingerprinting''. This entailed the characterisation of the facilities provided to test the filtration plant during its lifetime. The assessment of their adequacy was then used to identify necessary modifications and/or to propose the manner in which future in situ performance testing would be carried out. The paper outlines the basic principles and procedure that was used to ''fingerprint'' test systems during the commissioning of ...
The tide field at the time of liquid effluent discharging from Daya Bay nuclear powerstation, and the average water speed at the monitoring points in west Daya Bay from the time of discharging to the time of sampling were calculated by ADI (Alternating Direction Implicit) method. By comparing analysis, the difference of "3H diffusion between spring tide and neap tide (the expansion of "3H within one day of spring tide is greater than that within one day of neap tide) was found. So, an equivalent diffusion time is introduced to modify the original model, and a better attenuation relation between the average "3He concentration in west Daya Bay and the time since the liquid "3H discharging is obtained. (authors)
Knowledge, assessment and understanding of phenomena caused by ageing, together with systematic utilization and extension of the technical life-time of components and systems, are of critical importance to the safety and economy of electricity generation in nuclear powerstations. Economic use can be optimized by integrated ageing and life-time management; it can also be used to improve performance characteristics. (orig.) [Deutsch] Fuer die Sicherheit und Wirtschaftlichkeit der Stromerzeugung in Kernkraftwerken sind die Kenntnis, Bewertung und Beherrschung alterungsbedingter Phaenomene und systematische Ausnutzung bzw. Verlaengerung der technischen Lebensdauer der Komponenten und Systeme von zentraler Bedeutung. Durch ganzheitliches Alterungs- und Lebensdauermanagement, das auch auf die Verbesserung von Leistungsmerkmalen abzielt, kann der wirtschaftliche Nutzen optimiert werden. (orig.)
On nuclear powerstations with high temperature reactors and helium turbine cycles (HTR-single circuits) the residual heat from the energy conversion process in the primary and intermediate coolers is removed from cycled gas, helium. Water, which is circulated for safety reasons through a closed circuit, is used for cooling. The primary and intermediate coolers as well as other cooling equipment of the power plant are installed within the reactor building. The heat from the helium turbine cycle is removed to the environment most effectively by natural draught cooling towers. In this way a net plant efficiency of about 40% is attainable. The low quantities of residual heat thereby produced and the high (in comparison with powerstations with steam turbine cycles) cooling agent pressure and cooling water reheat pressure in the circulating coolers enable an economically favourable ...
As for No.2 plant in Sendai Nuclear PowerStation, which is the fourth nuclear power generation facilities in Kyushu Electric Power Co., Inc., all works have been completed, and at present, the final trial operation is under way. In No.2 plant, many new techniques for raising the reliability and safety, improving the maintainability and reducing radiation exposure were introduced on the basis of the operation experience of PWRs obtained so far, similarly to No.1 plant. In this paper, the main items of the new techniques related to the design and construction of the plant are reported. No. 2 plant is a first improved and standardized plant having the thermal output of 2660 MW for standard three-loop PWRs, and the rated power output was set at 890 MW. As for the turbine, TC6F-40 in was adopted. As the improved design, a large reactor containment vessel, 17 x 17 type 9-grid fuel, ...
A joint US/Russia program is being conducted to develop, fabricate, launch, and operate a solar dynamic demonstration system on Space Station Mir. The goal of the program is to demonstrate and confirm that solar dynamic power systems are viable for future space applications such as the International Space Station Alpha. The major components of the system include a heat receiver, a closed Brayton cycle power conversion unit, a power conditioning and control unit, a concentrator, a radiator, a thermal control system, and a Space Shuttle carrier. This paper discusses the design of the heat receiver component. The receiver comprises a cylindrical cavity, the walls of which are lined with a series of tubes running the length of the cavity. The engine working fluid, a mixture of xenon and helium, is heated by the concentrated sunlight incident on these tubes. The receiver incorporates ...
Peptide toxins with high affinity, divergent pharmacological functions, and isoform-specific selectivity are powerful tools for investigating the structure-function relationships of voltage-gated...Full Text Available
Sedentary adult males with spinal lesions, all habitual wheelchair users, were allocated to exercise (n = 11) and control (n = 4) groups. A Cybex II dynamometer was used to assess peak power, average...Full Text Available
Tarapur Atomic PowerStation Unit-3 and 4 (TAPS -3 and 4) are the 540 MWe reactors. Unit-4 attained first criticality on 06th March 2005 and operated for about 230 effective full power days (EFPD). Unit-3 attained first criticality on 21st May 2006 and operated for about 20 EFPD. With the reactor operation radiation field increases on the Primary Heat Transport system equipments, Moderator system equipments and auxiliary system equipments due to deposition of fission products and activation products in different reactor systems. These dose rates significantly contributes to the external exposure and stations collective dose during reactor operation, refueling operation and maintenance activities. A study was undertaken at TAPS 3 and 4 to identify the system equipments showing the significant dose rates and identify the radionuclides present in the primary heat transport system, Moderator systems, cover ...
During the past 15 years, 60 straw-fuelled and 25 wood-fuelled district heating stations were commissioned in Denmark, as well as 6 biomass-fuelled heating powerstations. All of these plants are equipped with high-pressure boilers, heat exchangers for district heating, and steam turbines with generators. Today, 5 percent of the total energy consumed is provided by biomass fuels. With the new taxes on carbon dioxide emissions and measures to promote renewable energy sources, a 15 percent share can be expected soon. (orig/SR) [Deutsch] In Daenemark wurden in den letzten 15 Jahren 60 strohbefeuerte und 25 holzbefeuerte Fernwaermewerke in Betrieb genommen. Dazu sind in den letzten Jahren 6 biomassebefeuerte Heizkraftwerke gekommen. Alle Anlagen haben Hochdruckkessel, Waermetauscher fuer Fernwaerme und Dampfturbinen mit Generatoren. Heute werden in Daenemark 15 Prozent des Energieverbrauchs mit Biomasse gedeckt. Durch ...
Radiowave scintillation in the presence of ionospheric disturbances has the potential to disrupt numerous transionospheric radio and radar systems. This report describes development of a model characterizing the plasma density irregularities that produce scintillation in the naturally disturbed mid-latitude F layer. The model will be incorporated into Program WBMOD, which includes subroutines for computing both link geometry and scintillation indices, the latter by means of phase screen diffraction theory. Earlier versions of WBMOD, were based on extensive analysis of scintillation data collected in the auroral and equatorial zones in Wideband Satellite Mission. The model described herein is based on similarly extensive analysis of Wideband data from one mid latitude station and of data collected from HiLat satellite at another mid latitude station. The model describes irregularities at an effective height of 350 km that are isotropic across ...
Exposure control at the operating Nuclear PowerStation is a major concern. TAPS Unit-4 is the first Pressurized Heavy Water Reactor of 540 MWe electrical capacity. This unit was made critical on March 6, 2005. In-depth review of radiation safety was done to identify the impact of design modification on dose rates at various locations and on the equipment's. Problems encountered in controlling the dose rates in 220 MWe electrical are eliminated by appropriate design modifications. Due to higher capacity of the unit there are design changes in major systems such as reactor core, primer heat transport system, moderator system, reactor regulation and protection systems. Reactor operations and maintenance activities during shut down contributes to exposure of the employees. Based on the experience gained in the operation of 220 MWe, design modifications incorporated in TAPS unit-4 and dose rate measurements carried out at 90 % full ...
A new algorithm for the design of decentralized output feedback stabilizers for large-scale electric power systems is presented in this paper. In the proposed approach, the generators which are most effective for stabilizer applications are first identified by using participation factors. Then an efficient algorithm based on decentralized pole assignment is proposed for the determination of the parameters of the power system stabilizers which, due to the difficulty associated with the communication among the geographically dispersed generating stations in a large power system, are essentially decentralized compensators using local generator outputs as their feedback signals. The proposed method is computationally efficient and can be applied to any large-scale system. The simplicity and effectiveness of the proposed method are demonstrated by an example of stabilizer design for a practical ...
Compared with that of Daya Bay Nuclear Power Plant, the reactor power of QS-II Nuclear Power Plant is decreased and the primary coolant system is changed from three loops to two loops. Thereby the related systems were re-designed, and corresponding tests and engineering validation were carried out. Results of preliminary operation indicate that it is successful. The author describes the design modifications, features and corresponding tests of some systems, reflecting the successful incorporation of engineering and testing, and revealing the capability to develop nuclear power and design the large or medium sized commercial NPP on Self-Reliance in China
The conception of a solar receiver intended to equip a tower power-station has to combine multiple requirements: very highly concentrated solar flux, unsteady in time and space; necessity to obtain a high efficiency; respect of the physical limits of the materials and of the fluid. The description of Themis solar receiver and of its operation is preceded by considerations which have led to the choice of the cavity, of the fluid and of its circulation.
The US$360 million project to increase gas supplies to Eastern and Southern Thailand is discussed, and the use of international competitive bidding to purchase the line pipe and other facilities is reported. The government approved proposal for a gas fired combined-cycle powerstation and gas separation plant are discussed. (UK).
In the area of seasonally thawing soil, porous or broken coatings cannot significantly retard the process of pile metal destruction, since it will occur through electroosmotic penetration of the base electrolyte to the metal surface. Such processes can be prevented by electrochemical protective methods. Systems based on grid cathode stations with power control and distribution units are recommended for use for cathode protection of steel pile foundations.
The authors describe the various human error encountered during Daya bay refueling overhaul, and the subsequent root cause evaluation and protective measure. Authors consider transparency is the key in reducing human error and event recurrence. Additional y, event transparency will enhance the effectiveness if experience feedback and reduce event consequence
To meet growth in the fast developing Pearl River Delta economic zone in China`s Guangdong province, a 270 MW oil-fired combined cycle at Foshan was built and commissioned in only 22 months from financial closure. This article describes the Foshan powerstation, specifications, design, procurement, construction and operating concerns. 5 figs.
In spite of extensive cooling water studies premature damage due to corrosion occurred on the CuZn20Al condenser tubes. It was then decided to incorporate new titanium-tubed condensers during the annual overhauls of 1983 and 1985 and also take ameliorating measures up to the exchange of individual condensers. (orig.).
A drift dye tracer experiment, using Rhodamine (WT) dye, was conducted on airborne drift from a natural draft cooling tower at PEPCO's Chalk Point, Maryland Power Generating Station. This experiment was designed to separate and identify cooling tower aero...
Contents of this volume include: Influence of Battery Characteristics on Traction Drive Performance; Chassis Design for a Small Electric City Car; Thermal Comfort of Electric Vehicles; Power Quality Problems at Electric Vehicle`s Charging Station; The Development and Performance of the AMPhibian Hybrid Electric Vehicle; The Selection of Lead-Acid Batteries for Use in Hybrid Electric Vehicles; and more.
This report discusses a desk-top computer program has been developed for estimating the costs, waste volumes, and occupational radiation exposures associated with decommissioning light-water reactor powerstations. Cost categories and cost algorithms used in the program are discussed and a brief description of the user interface is given.
Apparent molar volumes V{sub phi} and apparent molar heat capacities C{sub p,phi} were determined for aqueous solutions of nickel(II) nitrate, copper(II) nitrate, and zinc(II) nitrate at molalities m=(0.01 to 0.5) mol {center_dot} kg{sup -1}, and at the pressure p=0.35 MPa. Solution densities obtained using a vibrating-tube densimeter at T=(278.15 to 368.15) K were used to calculate V{sub phi} values. Heat capacity measurements obtained with a twin fixed-cell, differential-output, power-compensating, temperature-scanning calorimeter at T=(278.15 to 393.15) K were used to calculate values of C{sub p,phi}. Our results were then fitted to functions of m and T and compared to literature values.
The third regular inspection of No.2 plant in Sendai Nuclear PowerStation was carried out from December 27, 1988 to May 25, 1989. The parallel operation was resumed on April 28, 1989, 123 days after the parallel off. The facilities which were the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation and emergency electric power generation system. On the facilities which were the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out. As the results, significant in indication was observed in 8 bolts for fixing the flow-changing vanes of primary coolant pumps, and broken valve spindles were found, but other abnormality was not found. The works related to this regular inspection were accomplished within the range of ...
The second regular inspection of No.2 plant in Sendai Nuclear PowerStation was carried out from October 5, 1987 to January 8, 1988. the parallel operation was resumed on December 8, 1987, 65 days after the parallel off. The facilities as the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation, and emergency power generation system. On these facilities as the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out, and abnormality was not found at all. The works related to this regular inspection were accomplished within the range of allowable dose based on the relevant laws. The main reconstruction works carried out during the period of this regular inspection were the change of the degree of enrichment from 3.15 ...
The second regular inspection of No.2 plant in Sendai Nuclear PowerStation was carried out from October 5, 1987 to January 8, 1988. the parallel operation was resumed on December 8, 1987, 65 days after the parallel off. The facilities as the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation, and emergency power generation system. On these facilities as the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out, and abnormality was not found at all. The works related to this regular inspection were accomplished within the range of allowable dose based on the relevant laws. The main reconstruction works carried out during the period of this regular inspection were the change of the degree of enrichment from 3.15 ...
Tarapur Atomic PowerStation Unit-4 was made critical on 6th March 2005. Since radiation field builds up with the power level due to formation of fission products and activation products in different systems. Radiation dose rates were recorded from different areas using Area Radiation Monitors (ARMs) installed at different areas. These monitors are connected to Radiation Data Acquisition System (RADAS). The trend of radiation field build-up was also analyzed by making survey of different plant areas at various power levels and comparison was made with RADAS readings. The results obtained were compared with 220 MWe dose rates. This study discusses about the dose rates observed at accessible area, shut down accessible area and hotspots observed during the early stage of operation of the reactor. The attempt was also made to find the contributing factors of the high dose rates. It was found that the ...
The Nuclear Safety Commission presented the report to the Minister of International Trade and Industry on April 5, 1984, after the careful investigation and deliberation on the alteration of installation of No.1 and No.2 reactor facilities in the Sendai Nuclear PowerStation. The technical capability of Kyushu Electric Power Co., Inc., was recognized to be adequate. It was judged that the safety after this alteration of installation of the reactor facilities can be ensured. The main items of examination were as follows. The mechanical, nuclear and thermo-hydraulic designs of 17 x 17 B-type fuel assemblies were regarded as adequate. The coexistence of A-type and B-type fuel assemblies does not cause any problem about the safety. The safety at the time of abnormal transient change and accident in the mixed fuel assembly core was confirmed. In No.2 reactor, the degree of enrichment of the fuel for replacement and the number of ...
As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear PowerStation Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide ...
Pressurized fluidized bed combustion (PFBC) is an emerging coal-fired, combined-cycle power generation technology nearing commercial status through several operating and planned demonstration plants throughout the world. Current-generation PFBC plants use ``ruggedized`` gas turbines that can tolerate dust loading common with conventional cyclone gas cleaning. The next generation of PFBC will apply advanced hot gas cleaning systems that will reuse the dust loading to low levels acceptable to high performance, industrial gas turbines. These advances should result in performance and cost advantages. This article examines the demonstration of PFBC technology at Tidd powerstation.
The Conawapa-Winnipeg Power Transmission Complex includes five interrelated transmission and conversion facilities. This booklet describes work done on the upgrade of the southern receiver system, one component of the complex. The southern receiver system is composed of a network of high voltage transmission lines and station facilities. The booklet includes a description of the upgrade, the project setting, short and long-term effects and impact management, and the next steps to be taken in the process, including the regulatory process and public consultation.
This paper proposes a self-optimized coverage coordination scheme for two-tier femtocell networks, in which a femtocell base station adjusts the transmit power based on the statistics of the signal and the interference power that is measured at a femtocell downlink. Furthermore, an analytic expression is derived for the coverage leakage probability that a femtocell coverage area leaks into an outdoor macrocell. The coverage analysis is verified by simulation, which shows that the proposed scheme provides sufficient indoor femtocell coverage and that the femtocell coverage does not leak into an outdoor macrocell.
The major feed-water line break accident is re-analyzed, which is based on Guangdong Daya Bay nuclear powerstation final safety analysis report, to justify the impacts of the decreasing of auxiliary feed-water flow rate on the safety margin in Daya Bay. The results showed that the accident analysis can meet the demands of acceptance criteria with the auxiliary feed-water flowrate decreasing from 45 m"3/h to 41.8 m"3/h, and enough safety margin is still retained
In the last 30 years the production of electricity in the USSR has increased 14-fold, probably attaining 1540 billion kWH in 1985. Nuclear generation will provide the bulk of future increases of consumption, using both water-cooled and uranium/graphite reactors; stations of up to 1.5 million kW are in service. The USSR is also in the fore-front of attempts to exploit thermonuclear power. The USSR is also conducting experiments with renewable sources of energy such as solar, geothermal, wind and wave power and with magnetohydrodynamic generation. (D.A.J.).
The report covers the results of exposing materials for steam turbines to increased steam temperatures in two modules of the KOMET 650 testing facility at the Westfalen power plant. Ferritic/martensitic steels with 9 to 12% Cr and austenite and nickel-based alloys were investigated. Some experimental coatings on low-alloy Cr steel were also tested. The principal findings are presented. It will become possible to construct advanced powerstations to be operated at higher temperatures. (orig.)
There are many applications that necessitate reliable and permanent power supply, e.g. powerstations, airports, computer centers or hospitals. The stationary battery systems must be monitored by efficient systems, e.g. Batlog. (orig.) [Deutsch] Viele Anwendungen verlangen eine permanent verfuegbare und zuverlaessige Stromversorgung. Kraftwerke, Flughaefen, Rechenzentren oder Krankenhaeuser muessen ihre Prozesse auch bei einem Netzausfall oder einer Versorgungsunterbrechung weiterbetreiben. Dies gelingt nur, wenn sich der entsprechende Energiespeicher in einsatzbereitem Zustand befindet. Die Ueberwachung der stationaeren Batterieanlagen erfordert leistungsfaehige Systeme wie Batlog. (orig.)
In the construction work for the Unit No.5 Turbine Building at Hamaoka Nuclear PowerStation, the collaboration work for the planning and the coordination of the building construction and the machinery installation was carried out utilizing three-dimensional computer aided design (3D CAD) information. It was the first time in Japan for a building constructor and a plant manufacturer to work together, exchanging 3D CAD data of the whole building and adjusting the construction schedule. It was made possible to confirm the correspondence concerning the planning of both companies from the primary stage of the project by the total process simulation and to adjust on-going work precisely by the partial process simulation.
In the construction work for the Unit No.5 Turbine Building at Hamaoka Nuclear PowerStation, the collaboration work for the planning and the coordination of the building construction and the machinery installation was carried out utilizing three-dimensional computer aided design (3D CAD) information. It was the first time in Japan for a building constructor and a plant manufacturer to work together, exchanging 3D CAD data of the whole building and adjusting the construction schedule. It was made possible to confirm the correspondence concerning the planning of both companies from the primary stage of the project by the total process simulation and to adjust on-going work precisely by the partial process simulation.
The development status of the EE-1 Small Community Solar Thermal Power Experiment (SCSE Program) is presented. Current activities on the Phase II single module development effort are presented, together with plans for a Phase III 1 MW/sub e/ demonstration plant. A description of the various subsystems and components is given with a brief review of their development background. Latest performance figures are given for a 1 MW/sub e/ plant, based on 56 power modules, each consisting of a 12m parabolic dish concentrator, a cavity receiver, an organic Rankine power conversion subsystem and a ground-mounted solid-state rectifier.
The population doses and risks of stochastic effects from occupational exposures in Japan in 1978 were estimated on the basis of a nation-wide survey. The survey was conducted on annual collective dose equivalents by sex, age group and type of radiation work for about 82,500 workers other than the workers in nuclear powerstations. The data on the workers in nuclear powerstations were obtained from the offitial publication of the Japan Nuclear Safety Commission. The total number of workers except for nuclear powerstations was estimated to be about 170,000 persons. Radiation works were subdivided as follows: medical works including dental; nondestructive inspectional; non-atomic energy industrial; research and educational; atomic energy industrial and nuclear power industrial. The annual collective dose equivalents were estimated to be ...
A solid layer artificial pollution test was carried out to study the pollution performance of a new type of hybrid station post insulator used in suspension and tensile high voltage transmission lines. The structure of the separated silicone rubber shed and porcelain core hybrid insulator was shown. The new insulator showed excellent pollution performance under both HVAC and HVDC conditions. It also exhibited excellent aging performance in artificial aging tests. The mechanical strength of the hybrid insulator was also better than normal composite insulators. Another advantage revealed was the fact that separated silicone rubber sheds and porcelain core hybrid post insulators are easier to manufacture than normal porcelain post insulators and other hybrid insulators. 5 refs., 6 tabs., 1 fig.
A consequent use of computers and standardized components enables high efficiency for steam turbines while produced at lower manufacturing cost as shown here in the Muehlheim company of Siemens Power Generation, where steam turbines are produced for new stations and retrofitted elder power plants. [German] Auch eine ueber hundert Jahre alte Technik bietet Raum fuer Innovationen: Konsequenter Computereinsatz und standardisierte Baureihen ermoeglichen bei Dampfturbinen hohe Wirkungsgrade bei relativ niedrigen Fertigungskosten - umgesetzt im Werk Muelheim der Siemens Power Generation, wo Dampfturbinen fuer Neuanlagen und zum Modernisieren bestehender Kraftwerke entstehen. (orig.)
We consider relay selection technique in a cooperative cellular network where user terminals act as mobile relays to help the communications between base station (BS) and mobile station (MS). A novel relay selection scheme, called Joint Uplink and Downlink Relay Selection (JUDRS), is proposed in this paper. Specifically, we generalize JUDRS in two key aspects: (i) relay is selected jointly for uplink and downlink, so that the relay selection overhead can be reduced, and (ii) we consider to minimize the weighted total energy consumption of MS, relay and BS by taking into account channel quality and traffic load condition of uplink and downlink. Information theoretic analysis of the diversity-multiplexing tradeoff demonstrates that the proposed scheme achieves full spatial diversity in the quantity of cooperating terminals in this network. And numerical results are provided to further confirm a significant energy efficiency ...
The document gives statistics on the pollutive emissions from Danish power plants during the period 1987-1996, the main pollutants being sulphur dioxide, nitrogen oxides and carbon dioxide. Data on efficiency levels relative to the production of electricity and heating and on the power plants` contribution to the total emission of CO{sub 2}, NO{sub x}, and SO{sub 2} from energy consumption in Denmark, are presented, and also as corrected for the net import of electricity. Other data on the emission of each of these chemicals by power plants are presented as factual, and corrected in accordance with the net import of electricity, and as factual per consumed and produced energy unit at the power plants. Short notes on related Danish legislation are found in addition to information on sources, methods and definitions used as a basis for the production of this document. Emission from ...
The hydromechanical effect of hydroelectric stations on zooplankton is customarily regarded as a constantly acting and comparatively harmless factor, since its destruction is inevitable when water masses are passed through hydroelectric stations, but its capacity for restoration is high (i.e., destruction of the zooplankton of the forebay is compensated by its production in the after bay). It is not known how correct such an opinion is, or what is the true balance of losses and reproduction of zooplankton in the forebays and after bays of hydroelectric stations. However, hydroelectric plants of a new type, pumped-storage plants, have been constructed in recent years and others are planned for the Dnieper reservoirs. The operational principle and purpose of these plants is that they employ special vertical turbine-electric pumps that pump water at night from the reservoirs into pumped-storage facilities at high levels, and ...
Purpose of the Phase I effort was to demonstrate feasibility of the fuel cell/battery system for powering a small bus (under 30 ft or 9 m) on an urban bus route. A brassboard powerplant was specified, designed, fabricated, and tested to demonstrate feasibility in the laboratory. The proof-of-concept bus, with a powerplant scaled up from the brassboard, will be demonstrated under Phase II.
The paper discusses the role of the Life Management Programme in ensuring a safe operation of the Dukovany nuclear power plant. The Programme involves the following major items: (i) primary circuit materials degradation assessment, (ii) pipeline damage control by the Flow Assisted Corrosion Monitoring and Prediction Programme, and (iii) the DIALIFE diagnostic system. (author)
In this book an attempt has been made to describe the most recent information, but at the same time set out the fundamentals of cable technology in some depth. A focus is directed on general features of various kinds of cables. This book is written for cable engineers, and those interested in cable research, the book will also be useful to university students and management personnel interested in electric power engineering. This volume contains chapters on Present Cables and Their Improvement and New Types of Cables. (CS)
Stretch-out operation mode can deepen the reactor burnup when the boron concentration is near 0 mg/L, in which the additional reactivity is introduced by the reducing of the moderator temperature and the decreasing of the load. Stretch-out is used in many nuclear power plants all over the world. The first stretch-out operation has been used for the first time in China. As a specific operation mode, which outruns the original reactor core design, the related and specialized design argument and safety analysis is required. As a consequence of the continuous or stepwise reduction of load and moderator temperature, the neurotic measurement system and the reactor control and protection system parameters should be modified specially. Based on the schedule of the electricity production, the first stretch-out operation had been carried out from March 12 to March 21 2003. It successfully avoided the overlapping between 209 and 109 inspection shutdowns in Daya Bay Nuclear ...
Epidemiological studies could not show an association between ionising radiation of nuclear powerstations in routine operation and the incidence of childhood cancer, yet. The following report presents a case control study conducted by the German Childhood Cancer Registry since autumn 2003. All children in the study region, who were diagnosed with cancer between 1980 and 2003 at an age below five are included. In the first part of the study we investigate whether children with cancer (cases) lived closer to the respective nuclear powerstations compared to random children without cancer (controls). In the second part, for a subgroup of cases and controls we conduct computer assisted telephone interviews regarding confounders possibly associated with the exposure of ionising radiation and childhood cancer. Results are expected by the end of 2006. (orig.)
This article describes the project for the installation of an additional emergency diesel generator in both Asco and Vandellos NPPs. The basic objectives of this project are to improve the availability of the emergency generation system, in order to provide greater ability to address potential contingencies, and also to increase the flexibility of the preventive periodic maintenance of the emergency diesel generators. This maintenance, that is currently a milestone of the critical path of the refueling outage, will be performed on-line. The new diesel generator will be sized to support all the loads considered in the safety case and also the consumption of its own auxiliary systems, and will be tested for operability assessment on the same periodical basis than the existing ones. The solution adopted will also permit that the N diesel generator may be connected to any bus bar class 1E in a station black-out scenario. (Author)
Measurements of the statistical characteristics of channel wall static pressure fluctuations in parallel one-component boiling flow are reported. The measurements span a wide range of local subcooling and vapor volume fraction, and correspond to flow regimes ranging from highly subcooled bubbly to saturated slug-annular. Vapor volume fraction measurements at the pressure measurement station are also reported in conjunction with visual observation of the flow structure. Variation of static pressure fluctuation intensity and spectral content with local thermal-hydraulic condition is demonstrated. Finally, it is suggested that diagnosis of local two-phase flow regime on the basis of (i) statistical characteristics of the pressure data, and (ii) time trace of pressure signal, may be possible. 15 refs.
A number of amines can be employed for all volatile treatment (AVT) of steam generator (SG) systems of nuclear power reactors. These amines form complexes with Cu{sup 2+} and Ni{sup 2+} ions which come into water due to corrosion. The redox reactions of a number of Cu(II)-AVT amine complexes and the stability of the transient species formed have been studied by pulse radiolysis technique. Rate constants for the reaction of e{sub aq}{sup -} with a number of Cu(II)-amine complexes have been determined by following the decay of e{sub aq}{sup -} absorption. Stability of Cu(I)-amine complexes was studied by following the kinetics of the bleaching signal formed at the {lambda}{sub max} of the Cu(II) amine complex. Except for Cu(I)-triethanolamine complex all other Cu(I)-amine complexes were found to be stable. One-electron oxidation of Cu(II) amine complexes was studied using azidyl ...
The proceedings include the following lectures: Facing the challenges - new structures for electricity production. Renewable energies in Europe - chances and challenges. Nuclear outlook in the UK. Sustainable energy for Europe. Requirements of the market and the grid operator at the electricity production companies. Perspectives for the future energy production. Pumped storage plants - status and perspectives. Nuclear power/renewable energies -partners or opponents? New fossil fired powerstations in Europe - status and perspectives. Nuclear energy: outlook for new build and lifetime extension in Europe. Biomass in the future European energy market - experiences for dong energy. Meeting the EU 20:20 renewable energy targets: the offshore challenges. DESERTEC: sustainable electricity for Europe, Middle East and North Africa. New power plants in Europe - a challenge for project and quality management. ...
This paper systematically introduces the supervision monitoring for radiation environment around the Guangdong Daya Bay and Ling Ao nuclear powerstation by the Guangdong Environmental Radiation Research and Monitoring Center. It includes the monitoring plan, methods, quality assurance, main results and conclusions. The results show that: (1) The gas discharge have not caused any detectable impacts to the terrestrial and atmospheric environment since their operation; (2) "1"1"0"mAg could only be detected in seawater in the West Daya Bay in 1995 and 1997 and in sediments in 1997. The maximum annual average in seawater was 3.1 Bq/m"3, annual average of "1"1"0"mAg in sediments was 1.0 Bq/kg(dry). But it was always detectable in pearl oyster, gulfweed and cuttlefish in the West Daya Bay. The "1"1"0"mAg concentrations in halobios were relatively higher in 1994, 1996 and 1997. The maximum concentrations in pearl oyster, gulfweed and cuttlefish were ...
During the normal operation of a Nuclear Power Plant (NPP), radioactive releases into the atmosphere will be in small quantities. During major accidental situations, though the probability is extremely small, there may be significant release of radioactivity to the environment through the stack or at ground level. To study the external radiation exposure, if any, to the members of public due to releases during the normal operation of a nuclear power plant (NPP) and also to meet the requirement of emergency preparedness for the NPP site, continuous recording and analysis of environmental dose rate data is essential. This paper presents analysis of the gamma dose rates recorded by the Environmental Dose Logging Systems (EDLS) installed around the site during the last six years in the Emergency Planning Zone (EPZ) of Tarapur Atomic PowerStation (TAPS). (author)
Novel and unprecedented ion exchange resin cleaning system, for use in BWR plants and featuring a vibration separator and basic design factors of Radiological Solutions, Inc., had been delivered to Tokai No. 2 PowerStation, Japan Atomic Power Company, in October 2005. This compactly-designed system effectively separates crud and resin fines from ion exchange resins, with no clogging of separation screens. It generates minimized waste liquid and has a specially designed over-pack cleaning tank. The system has been in operation for about 2 years and half now and favorable operational data, such as crud and sulfate concentration decrease in feed water and reactor water respectively, and evaluation results have been reported from Japan Atomic Power Company and so on. (author)
The report gives results of an analysis of the effect of the availability of a flue gas desulfurization system on the ability of an individual power plant to generate electricity at its rated capacity. (The availability of anything is the fraction of time it is capable of service, whether or not it is actually in service.) Also analyzed are its effects on a power generating system (a group of several coal-, oil-, and gas- fired power plants plus nuclear and hydroelectric plants).
The conceptual design, parametric analysis, cost and performance analysis, and a commercial assessment of a 100-MWe high-temperature line-focus central power system are presented. Parametric analyses and conceptual design of the heliostat subsystem, receiver subsystem, heat transport subsystem, energy storage subsystem, electrical power generating subsystem, and master control subsystem are included. A market analysis and development plan are given. (WHK)
This paper describes Automatic Refueling Planning System (ARPS) for a nuclear powerstation using Genetic Algorithms (GA) and a Simulated Annealing (SA). ARPS has been developed and verified by applying to the Fugen nuclear powerstation (NPS), which is a 165MWe, heavy water-moderated, boiling light water-cooled, pressure tube-type reactor developed by JNC utilizing mainly uranium and plutonium mixed oxide (MOX) fuel. Fuel loading patterns have been managed independently in the Fugen NPS since the initial core. A planning of an adequate fuel loading pattern on each operational cycle needs one to two months even for expert core management engineers, for the reason that it has multi-objective optimization and nonlinear problems. In order to achieve the optimum fuel loading pattern and a fuel cost reduction, ARPS has been developed by JNC and CRC Solutions Corporation for the last five years. ARPS firstly ...
This document presents the analysis of the simulation of the loss of coolant accident at uprate power conditions, that is 2027 MWt (105% of the current rated power of 1931MWt). This power was reached allowing an increase in the turbine steam flow rate without changing the steam dome pressure value at its rated conditions (1020 psiaJ. There are also presented the results of the simulation of the main steam isolation va/ve transient at overpressure conditions 1065 psia and 1067 MWt), for Laguna Verde Nuclear PowerStation. Both simulations were performed with the best estimate computer code TRA C BF1. The results obtained in the loss of coolant accident show that the emergency core coolant systems can recover the water level in the core before fuel temperature increases excessively, and that the peak pressure reached in the drywell is always below its design pressure. Therefore it is ...
...of stations and a number of components, and meta information on air quality monitoring networks and stations. Access the database Producer Europe Environment Agency Content ...of stations and a number of components, and meta information on air quality monitoring networks and stations. Coverage National (Europe) Number of records...
This paper introduces the solid radwaste management system, treatment methods and its continuous improvement during the past 9 years in Guangdong Daya Bay Nuclear PowerStation (GNPS). GNPS has paid great attention and made a lot of efforts to implement the principle of waste minimization with source control, improvement of treatment process and strict management, so the output of solid radwastes has annually decreased since 1994. In 2002, the output of solid radwastes in GNPS was 63.5 m"3, only 50% of 1995 (127 m"3), reached the advanced level as the same type NPPs in France. During the period 1994-2002, the accumulated production of solid radwaste Packages in GNPS is 1563.51 m"3 only 18% of the design value; all the packages meet the standard and requirement for safe disposal. Besides, this paper analyzes some new technical processes and presents some proposals for further decreasing the solid radwaste production
For the recruitment, training and position qualification of the simulator instructors and feedback of training effect, the management approaches are formulated in 'The System for Simulator Training and Licensing Examination of Daya Bay Nuclear PowerStation Operators'. The concrete requirements on the professional knowledge, work experience and foreign language ability of a simulator instructor are put forward. The process of instructor training is designed. The training items include the trainer training, pedagogy training, time management training, operation activities training during outage of unit, 'shadow' training and on-the-jot training on simulator courses. Job rotation is realized between simulator instructor and licensing personnel on site. New simulator instructor must pass the qualification identification. After a duration of 2 years, re-qualification has to be carried out. On the basis of the operator training method introduced ...
The 380 MW combined cycle gas turbine powerstation in Peterborough changed its water supply from town mains to high purity reverse osmosis permeate in October 2000. The high purity water is produced from secondary treated sewage effluent using advanced membrane technology. Alpheus Environmental and British Gas staff have recently completed a study of the powerstation's demineralization plant to identify the differences in operating costs associated with the change in feedwater. The results show that the ultrapure water produced after the change to a high purity feed is of improved quality and that the demineralization plant regeneration operating costs have been reduced by over 90%. The demineralization plant availability has increased from 78 to 98% enabling almost 20% more ultra pure water to be produced. The change in feedwater has also improved the local environment by significantly ...
The design boron concentration of the Boron Injection Tank (BIT) in Daya Bay Nuclear PowerStation is 21000 #mu#g/g. The BIT should operate under high temperature to avoid boron crystallization, causing higher evaporation, frequent water makeup, higher deposition and pipe blockage to decrease the operability of the safety injection system. The author proposes to decrease the boron concentration in BIT from 21000 #mu#g/g to 7000 #mu#g/g to solve the existing problem. The safety analyses (core DNBR and containment response) are conducted and other impacts are evaluated for the BIT reduction. The analysis results show that the core DNBR meets the safety criterion and the containment pressure is within the design value for the steam line rupture accident after the BIT reduction. The feasibility study report of Daya bay BIT reduction has been approved by NNSA. The site implementation of BIT reduction has been finished successfully
Based on a detailed analysis of the inter-relationship in the current, voltage, electromagnetic torque and ratio of the difference between the speed of rotor and the speed of rotary magnetic field to the later in the motor, the root cause was point out, which leads to the protection fuses' failure of the motor in the starting stage, which drives the turbine-generator set to rotate at low speed before its startup. Two solutions to avoid the situation are proposed, too. (authors)
The rate at which full-scale technology transfer takes place depends on the quality of the supply companies, i.e. training, organisational development and product infrastructure. These parameters are discussed for the example of a water mill, and a flow diagram is presented. [Deutsch] Wie rasch ein umfassender Transfer in Frage kommt, entscheidet sich mit der Qualitaet und dem Niveau der zuliefernden Betriebe. Hierbei sind Ausbildung, Organisationsentwicklung und Produktionsinfrastruktur besonders angesprochen. Fuer eine Wassermuehle werden diese Parameter konkret eroertert und an Durchlaufdiagrammen erlaeutert. (GL)
We present the results obtained from tests and studies carried out on the model of tube bundles for a PGV-1000 horizontal steam generator that were conducted for experimentally substantiating the design service life of a steam generator tube bundle intended for use at new nuclear powerstations equipped with a PGV-1000MKP steam generator. Measures taken to minimize the incipience and development of local corrosion damage to the heat-transfer tubes and ensure their design service life are substantiated and confirmed.
In order to realize improve of reliability and economy by duplicate production, rapid supply of repair parts from standardized storage, such were expected as to have continuous order of standardized plant, to ignore site condition, to avoid expansion of regulatory requirement. Standardization program was planned to limitedly promote standardization of safety-related design concept, major specification and basic system composition of reactor and primary systems. The area of standardization had been tried to expand to BOP such as general arrangement and rad-waste system.
A study was undertaken of problems encountered in the use of thermal powerstation coal ash and red mud (an aluminium smelting residue) as a banking or filling material, the aim being the effective utilization of these substances. Like clinker, coal ash and red mud can also be used as improvers, but there are various problems such as absorption swelling, strong alkalinity, and the difficulty of controlling the moisture content. Certain measures have to be carried out in on-site use to combat these problems. (11 refs.)
In the powerstation West Block 2 at Voerde (Federal Republic of Germany), cracks in the final stage of the shaft were determined at the ND1 rotor of the 350 MW condensation tube was determined. A purely mechanical preparation of the crack was not possible due to the depth of the crack. A substitute rotor was not available. A repair solution was developed covering a welding of a new shaft section to the existing rotor. The authors of the contribution under consideration report on the damage, cause of the damage, repair solution and the process of repair.
Rubber lining is used as a corrosion protection material in European flue gas desulfurization plants, for scrubbers, tanks, pipe systems, etc. Although these rubber linings can last more than 15 years, relining still is necessary. The difficulty of shutting down powerstation units requires that the time scale of this replacement be kept to a minimum. High-pressure water systems have proven successful as an efficient method for removal of the old lining. The working steps and time scale are demonstrated for one such relining case.
A combination of computer codes such as LATREP, HWRAXAV and CITATION is utilized in an attempt to analyze the nuclear design characteristics of the CAXDU-PHWR of the Wolsung Unit 1. The major nuclear properties to be computed are the lattice properties of CANDU fuel channel and the core channel power distribution. The computed results are compared with the preliminary safety reports documentation for the Wolsung reactor. The observed discrepancies between our computations and the preliminary safety reports values are discussed in terms of incomplete information on the description of the core configuration in the preliminary safety reports and the different calculation methods. (author).
This invention concerns a hydraulic braking system for loads subjected to impacts and vibrations. These double acting telescopic type hydraulic braking systems possess significant drawbacks linked to possibly important hydraulic leaks due to (a) the use of many dynamic seals in such appliances and (b) the effects of the environment of the system on these seals, particularly when employed in nuclear powerstations where the seals reach significant temperatures and are subjected to radiation. Under this invention a remedy is suggested to such drawbacks by integrating means to offset automatically the leaks and the accumulation of hydraulic fluid expansions, as well as facilities to show if such leaks have occurred.
In the study a preliminary mid-term analysis of the BARCOM test model is presented. The BARCOM test model is a 1:4 scale of an existing pressurized heavy water reactor (PHWR) pre-stressed concrete inner containment of 540 MW Tarapur Atomic PowerStation 3 and 4 units in India. The goal of this midterm analysis is to illustrate the modeling approach and achieve a prediction of the failure mode. The analysis was carried out using ABAQUS/CAE and ABAQUS/EXPLICIT version 6.7-EF1 software
This paper deals with the pitting corrosion of evaporators in the liquid - radwaste system of nuclear powerstations. Corrosion testrs were conducted by the anodic polalization of specimen in the chloride solution. (1) The initiation of the pitting in SUS 304, SUS 316 stainless steels was inhibited by addition of NaOH and H_3BO_3, however, these addition had no effect on the pitting propagation. (2) Inconel 625 had the resitivity against the pitting initiation superior to that of stainless steels, but this was not necessarily in the case of the pitting propagation. (3) It is noticed for pitting prevention that the environmental and material effect on the pitting initiation differed from that on the pitting propagation. (author).
Although there is service experience of Alloy 800 as tubing for superheaters in conventional and nuclear (HTR) powerstations and in PWR heat exchangers, there is no corresponding service experience in sodium-cooled fast reactor steam generators. However, some limited experimental studies have been made of corrosion behaviour, and of possible structure modifications and effects on mechanical properties which occur during exposure of this material to a high temperature sodium environment, and these are summarised in the paper. It is concluded that further work needs to be done before Alloy 800 can be confidently endorsed for use as tubing in fast reactor steam generators. (author).
Only about 25% of residue accumulating in the Federal Republic of Germany is currently used for the purposes of energy. This residue will be converted into fuel for powerstations by the Omega process when the dumping of waste with a calorific value in excess of 5 MJ/kg is prohibited with effect from 2005. This oxygen melting process is suitable for the local use of substitute fuels. Waste is converted into a high-quality synthesis gas with a wide range of uses. The Omega process combines drying, thermal decomposition, gasification and melting of the material used in a single-stage process. This is now technologically possible for the first time by combining a metallurgical cupola furnace with a traditional gas producer. The highly-calorific synthesis gas produced by the Omega process can be used in block heat and powerstations or as an industrial fuel gas, instead of natural gas. It is also suitable ...
In Romania, the nuclear power is an element of sustainable development, being competitive, efficient and viable in the market economy. Fuel supply is ensured as nuclear fuel is manufactured in the country out of local uranium resources available in Romania. As for the environmental protection, it is known that, unlike the thermal power plants, the nuclear power plants do not release sulfur and nitrogen oxides, carbon dioxide and do not generate slag and ashes. The operation of nuclear power units does not release pollutants and, accordingly, these stations can contribute to the limitation and the abatement of environmental pollution. After seven years of Cernavoda NPP Unit 1 operation, a facility for storing low and medium level nuclear fuel wastes was built at the plant site as well as an intermediate dry storage for spent nuclear fuel whose first modules were commissioned in July ...
The demonstration test of a power system stabilizer, employing a fuzzy theory, in the two hydroelectric powerstations of Kyusyu Electric Power Co., Inc. is described. The PSS inputs auxiliary signals to the automatic voltage regulator (AVR) of a generator and generates an electric torque in the direction opposite to the operating direction of a generator to enhance the damping effect and improve the system stability. Usually, the change in the slide information of a generator is detected, and the phase adjustment is performed so that the damping is the optimum value. However, since the damping is optimized in the specific system state, no complete damping may be obtained when the system state is changed. A fuzzy theory was thus applied for the control operation part. In a secondary fuzzy PSS, the velocity and acceleration were calculated from the slide information of a generator to produce a control ...
A free-electron laser (FEL) user facility is discussed. The FEL, which will be operated as an oscillator, will be driven by the electron beam of the racetrack microtron (RTM) that is nearing completion. Variation of the electron kinetic energy from 17 MeV to 185 MeV will permit the FEL wavelength to be tuned from 200 nm to 10 #mu#m. Performance will be enhanced by the high brightness, low energy spread, and continuous pulse nature of the RTM electron beam. The authors are designing a new injector to increase the peak current of the RTM. A 3.6-m undulator is under construction, and the 9-m optical cavity is under design. The FEL will emit a continuous train of 3-ps pulses at 66 MHz with an average power of 10--200 W, depending on the wavelength, and a peak power of up to several hundred kW. An experimental area is being prepared with up to five stations for research using the FEL beam.
Japan Atomic Energy Research Institute (JAERI) is developing the world`s strongest spallation neutron source using high power proton accelerator and promoting a neutron science project for comprehensive studies on basic science and nuclear transmutation of high-level radioactive nuclide from nuclear powerstations. For this purpose, JAERI organized the Special Taskforce for Neutron Science and OMEGA Project in April 1996 and reorganized it to Center for Neutron Science in April 1997. During this period, various research plans using the spallation neutron source are proposed and facilities necessary for research are studied by mainly research groups of JAERI. This report describes research plans and results of the preliminary conceptual design study on proposed facilities plan. (author)
When operating a nuclear power plant the necessity arise to eliminate various defects of building constructions, to seal joints and transitional elements. The authors present data concerning the production of a sealing composition made of epoxy resin and used for NPP premises of emergency location. Analytical relations are presented between the properties of the composition (adhesion strength, water absorption and others) and its structure. Physical, mechanical and thermal properties and structural peculiarities are determined in the process of interaction between the filling and binding agents. The composition sustains sealing properties under environmental conditions at he presence of an air - vapour mixture with 160 degrees C"o temperature and 0.3 MPa surplus pressure. (author).
A neutron scanning device was developed in order to obtain accurate neutron intensities of high burn-up BWR fuels. This scanning device was calibrated with a "2"5"2Cf source and used to measure axial distributions of neutron intensities of BWR fuels with various enrichments (2.0%-3.4%) irradiated up to 60 GWd/tU at Fukushima Daini Nuclear PowerStation Unit 2(2F-2). The measured neutron intensities were approximated well with power law interpolations on the calculated burn-up values. The neutron intensities calculated by the ORIGEN2-86 code showed good agreements with the measured ones within 20%. (author)
This paper proposes two interference mitigation strategies that adjust the maximum transmit power of femtocell users to suppress the cross-tier interference at a macrocell base station (BS). The open-loop and the closed-loop control suppress the cross-tier interference less than a fixed threshold and an adaptive threshold based on the noise and interference (NI) level at the macrocell BS, respectively. Simulation results show that both schemes effectively compensate the uplink throughput degradation of the macrocell BS due to the cross-tier interference and that the closed-loop control provides better femtocell throughput than the open-loop control at a minimal cost of macrocell throughput.
The AZSh protective circuit breakers developed by the VNIIVEh Institute and the Prokop'evsk plant for mine automation will replace a number of circuit breaker systems used in underground coal mines in the USSR. The standardized AZSh circuit breaker generation consists of 3 basic types: the AZSh-1, the AZSh-2 and the AZSh-3 systems for power systems with 380 or 660 V voltage. Block scheme of the AZSh system is given. Its specifications are discussed. The AZSh circuit breakers are used for protection of transformer stations from overload and heating as well as for automatic shutdown of energy supply to a power system in emergency situations. Design, basic elements and operation of the AZSh-1, the AZSh-2 and the AZSh-3 protective circuit breakers is evaluated. Commercial production of the AZSh started in 1983.
Severe accident analysis has been performed for the Wolsung nuclear power= plants in Korea to investigate severe accident phenomena of CANDU-600 reactors as a part of Level II PSA study. The accident sequence analyzed in this paper is loss of active heat sinks (LOAH) which is caused by loss of off-site power, diesel generators, and DC power. ISAAC (Integrated Severe Accident Analysis Code) computer code developed by KAERI (Korea Atomic Energy Research Institute) was used in this analysis. This paper describes the important thermal-hydraulics and source term behaviors in the primary system and inside containment, and the failure mechanisms of calandria vessel and containment. In addition, some insights for accident management program (AMP) are also given. (Author) 5 refs., 1 tab., 12 figs.
Severe accident analysis has been performed for the Wolsung nuclear power plants in Korea to investigate severe accident phenomena of CANDU-600 reactors as a part of Level II PSA study. The accident sequence analyzed in this paper is loss of active heat sinks (LOAH) which is caused by loss of off-site power, diesel generators, and DC power, ISAAC(Integrated Severe Accident Analysis Code) computer code developed by KAERI (Korea Atomic Energy Research Institute) was used in this analysis. This paper describes the important thermal-hydraulics and source term behaviors in the primary system and inside containment, and the failure mechanisms of calandria vessel and containment. In addition, some insights for accident management program (AMP) are also given.
Energy consumption is a perennial issue in the design of wireless sensor networks (WSNs) which typically rely on portable sources like batteries for power. Recent advances in ambient energy harvesting technology have made it a potential and promising alternative source of energy for powering WSNs. By using energy harvesters with supercapacitors, WSNs are able to operate perpetually until hardware failure and in places where batteries are hard or impossible to replace. In this paper, we study the performance of different medium access control (MAC) schemes based on CSMA and polling techniques for WSNs which are solely powered by ambient energy harvesting using energy harvesters. We base the study on (i) network throughput (S), which is the rate of sensor data received by the sink, (ii) fair...
In this paper, results on ozone production by atmospheric pulsed discharge, are reported. In the research, two types of ozonizer (Type I and Type II) have been used to investigate improvements of ozone concentration and production efficiency. The ozonizer has plane-to-plane metal electrodes structure, and pre-ionization electrodes are placed on the high voltage electrodes (Type I). In Type II, the surface of grounded electrode with 20 mm of width is covered partly by dielectric (thin rubber) with 11 mm of width, while the geometry of both metal electrodes is same to Type I. In the case of Type I, maximum concentration of about 100 ppm and maximum yield of 70 g/kWh were obtained at input power of 0.3 W. On the other hands, in the case of Type II, 800 ppm and 100 g/kWh were obtained at input power of 1.5 W. It was found that the ozone concentration and production yield were improved ...
We describe the development of a fully coupled climate model configuration where the Community Climate System Model (CCSM) has been coupled with the VERDE (Visualizing Energy Resources Dynamically on the Earth) analysis modules that compute the response of the electric grid to temperature drivers. The VERDE model includes datasets characterizing the 26,500 sub-stations and 6,000 power generation stations fuel mix, efficiency, service areas, and future performance and these have been geo-located on a 1.4 degree latitude by 1.4 degree longitude CCSM grid (T85). The total electric customers have been computed using conversions derived from economic structure and population data. The carbon emissions per customer and the power generation in megawatts electric (MWe) have also been placed on reconciled 1 km, 4 km and the T85 climate model grid. The CCSM temperature for the present and future have been ...
This report beings with a historical overview on the origin and early beginnings of Radiant Energy Power Source for Jet Aircraft. The report reviews the work done in Phase I (Grant DE-FG01-82CE-15144) and then gives a discussion of Phase II (Grant DE-FG01-86CE-15301). Included is a reasonably detailed discussion of photovoltaic cells and the research and development needed in this area. The report closes with a historical perspective and summary related to situations historically encountered on projects of this nature. 15 refs.
This report beings with a historical overview on the origin and early beginnings of Radiant Energy Power Source for Jet Aircraft. The report reviews the work done in Phase I (Grant DE-FG01-82CE-15144) and then gives a discussion of Phase II (Grant DE-FG01-86CE-15301). Included is a reasonably detailed discussion of photovoltaic cells and the research and development needed in this area. The report closes with a historical perspective and summary related to situations historically encountered on projects of this nature. 15 refs.
The symposium covers papers under different sections namely, (i) Core physics and Fuel management, (ii) Commissioning of facilities and systems, (iii) Operational experience and Human resource development, (iv) Fuel handling, Maintenance management and Surveillance, (v) Instrumentation and Control and Power supply systems, (vi) Analysis, modifications and developments for enhancing operational safety, (vii) Chemistry control and Effluent management, (viii) Radiation and industrial safety and (ix) Steam generators, Turbo-generators and other auxiliaries. Papers relevant to INIS are indexed separately. (author)
The progress report for the Theoretical Physics Division of the United Kingdom Atomic Energy Authority, Harwell, 1985/6 is presented. The Division's research programme is divided into four sections - i) nuclear power (fuels, inspection and safety aspects), ii) radioactive waste management, iii) underlying research, and iv) non-nuclear contract research. The report contains a description of the research work carried out on these four topics in the above period. (U.K.).
A quadruply redundant synchronous fault tolerant processor (FTP) is now under fabrication at the C.S. Draper Laboratory to be used initially as a trip monitor for the Experimental Breeder Reactor EBR-II operated by the Argonne National Laboratory in Idaho Falls, Idaho. The real time operating system for this processor is described.
Potential strategic missions for laser weapons, particularly those involving space-based lasers, are discussed. The functions of space-based lasers and the history of their conceptual development are summarized, and the problems of implementing such systems, including the building of a suitable laser and power source, and resolving the problem of optics, are discussed. Ongoing development programs are described, and the contrasting views of the necessity and usefulness of strategic laser systems are set forth.
Results are reported from dye tests of the dispersion of the vapor plume from the natural draft cooling tower of a fossil-fuel power plant located in the coastal region of Maryland.
As an alternative to the usual way of installing wind machines in extended windfarms new concepts are being developed. Several wind turbines are affixed to one support structure and can be aligned together. Drafts of steel constructions developed by students in three diploma theses are presented. The attempt to transform existing design standards requires extensive discussion of possible influence scenarios. Several concepts regarding structure and safety elements are described and evaluated. The design of the support structure is to be seen as a first step to the practicability of the whole concept. A preliminary mass calculation and a specification of further cost factors facilitates the comparison to conventional wind powerstations. (orig.) [Deutsch] Als Alternative zur ueblichen Praxis, Windenergieanlagen in Form grossflaechiger Windparks zu bauen, werden Konzepte entwickelt, bei denen mehrere Konverter an einem Tragwerk angeordnet und ...
On February 9, 1995 ComEd experienced a pipe type cable failure on 138kV line 13717. Line 1737 is a bulk power transmission cable circuit connecting The Fisk and Crawford generating stations located within city limits. The line is approximately 4.5 miles long and was originally installed in 1975. This line is forced cooled, has 2,500 KCMIL copper conductors with 505 mils of paper insulation in an 8 inch pritec coated steel pipe. The splices are constructed with Voltalit castings. The failure occurred approximately 3,500 feet from Crawford Station. It was easy to locate the failure since the cable joint casing was breached resulting in the loss of approximately 2,600--2,700 gallons of dielectric fluid. Upon field examination B Phase was determined to have failed. The failure occurred 12 inches inside the casing in an area where it was impossible to install a long connector or add an additional short length of cable to create ...
In this paper, an investigation was performed on a failure pressure vessel, which was as an anti-freezing heater for General Gas Storage and Distribution (SGZ) system. Evident and serious deformation was observed on the body of the vessel. A metallurgical investigation was conducted to establish the mechanism and cause of deformation of the anti-freezing heater at Daya Bay PWR station in China. The investigation, which was performed on specimens cut from the most serious area deformed of the vessel, included macroscopic examination and microscopy examination. The results of the examinations showed that some lamellar pearlite in the microstructure were already spheroidized. It was confirmed that the vessel was operated at high temperature. Stress analysis for the vessel was conducted. And it was confirmed that, in ideal conditions, the vessel would be deformed at around 420 C. The overall results of the investigation showed that the failure of the protected ...
At Tarapur Atomic PowerStation 3 and 4, 540 MWe Pressurised Heavy Water Reactors, core being large in size requires a continuous in core monitoring for local flux disturbances. Nearly 200 Self Powered Neutron Detectors (SPNDs) of the Straight Individually Replaceable (SIR) type are distributed in the reactor core. For purpose of reactor regulation and protection, cobalt SPNDs that have a prompt response for changes in power is used for in-core flux mapping, vanadium SPNDs that provide accurate measure of neutron flux, even though having slow response is used In core SPNDs are placed in Vertical Flux Units (VFU) and Horizontal Flux Units (HFUs). These SPNDs were to be replaced at regular intervals to meet the design intent. Cobalt SPNDs have dose rates of the order of 1000 Gy/h and the Mineral Insulated (MI) cables of Vanadium SPNDs have dose rates of the order of 100 Gy/h. So far 3 Cobalt SPNDs were ...
In 1970, the Federal Power Commission predicted a fall from 46% to 27% in 1990 as a result of predicted increases in the use of nuclear power. Today, the Department of Energy expects coal to supply about 50% of electricity generation in 1990. About one-eighth of the world's annual hard coal production is used to make electricity in the United States. Powerstations in the country used more coal in 1979 than was produced in the whole Western Europe that year. These 405,000,000 tons of coal equivalent were burned in 1257 individual utilities with an aggregate capacity of 235,000 megawatts. There are coal-fired power plants in 43 of the 50 states. Four factors will be most important in shaping the future development of coal-based electricity: prices, conservation, environmental regulations, and national security. The price differential between coal and oil has now reached a ...
The harnessing and enhanced use of renewable energy today is a matter of lively debate and much concern. Amazingly, hydro power is either rarely considered in these discussions or viewed in a negative light. But hydro power continues to be the most important source of renewable energy, and its use potential is considerable and should be taken into account when, for instance, agreeing on or implementing carbon dioxide reduction targets. Small hydro powerstations are an effective means of harnessing existing energy potentials. (orig.) [Deutsch] Ueber die Nutzung und den Ausbau regenerativer Energien wird heutzutage lebhaft diskutiert und gerungen. Es mag erstaunen, dass in diesen Diskussionen die Wasserkraft kaum Beachtung findet oder in einem schlechten Licht gesehen wird. Dabei ist die Wasserkraft nach wie vor bei weitem die wichtigsten Quelle regenerativer Energie, und sie besitzt ein beachtliches ...
Over the past few years, NPCIL has performed comprehensive Level-1 Probabilistic Safety Assessment (PSA) for a 220 MWe Pressurised Heavy Water Reactor (PHWR) at Kakrapar Atomic PowerStation (KAPS) and for the first 540 MWe PHWR at Tarapur Atomic Power Project (TAPP- 3 and 4). The major objective of these PSAs was to present an integrated picture of the safety of the plant to identify and understand key plant vulnerabilities. As a result of the availability of these PSAs, there is a desire to use them to operate the plants in the most efficient manner practicable. In recent years, the operation of Indian Nuclear Power Plants has been characterized by improved availability/capacity factors and reduced forced outages. Frequency of planned outages is also being reduced. In order to achieve this, the PSAs are now being used as an engineering tool for optimization of Technical Specifications with regard to ...
Reviews types of hydraulic power shovels used in coal surface mines in the USA, FRG, Japan and other countries. Excavators of the first, second and third generation are compared. Hydraulic schemes of the excavators are compared. The following excavators are reviewed: the RH-75, RH-75C, 1000 SK, H-801, RC-1500, H-185, EX-1800, R-994, RH-120C, H-241, Marion 3560, H-285, EX-3500, H-485, RH-300. The following parameters are compared: mass, price, digging range, digging power, productivity, motors, travelling speed, availability coefficient, pressure in the hydraulic systems, control systems. The following elements are discussed: schemes of hydraulic drives, main motors and engines, pump stations, hydraulic equipment, hydraulic accumulators, systems for cleaning and cooling hydraulic fluids, control systems, working fluids. Reliability of hydraulic power shovels and factors that influence reliability are ...
Over the past 15 years, the People's Republic of China has experienced very rapid economic growth of annual average 8%, which must be supported by fast expanding energy production, notably of electricity. China has the considerable amount of coal resources, but most of these resources are located in the north of the country, and the vast hydroelectric potential in Southwestern China is difficult to develop. Therefore, in the coastal provinces of Southeast China, where economic expansion is greatest, nuclear power has been chosen to meet the need. The Qinshan No. 1 PWR with 300 MWe output is the first Chinese nuclear power facility, and started the operation in 1992. Two 985 MWe PWRs have been operated since 1994 at Daya Bay. The construction of Qinshan No. 2 and 3 PWRs of 600 MWe each are in progress, and are expected to start the operation in 2001. These plants were designed by China based on the Framatome technology. Two more 985 MWe plants ...
We present results of a study of large-scale neutral hydrogen (HI) gas in nearby radio galaxies. We find that the early-type host galaxies of different types of radio sources (compact, FR-I and FR-II) appear to contain fundamentally different large-scale HI properties: enormous regular rotating disks and rings are present around the host galaxies of a significant fraction of low power compact radio sources, while no large-scale HI is detected in low power, edge-darkened FR-I radio galaxies. Preliminary results of a study of nearby powerful, edge-brightened FR-II radio galaxies show that these systems generally contain significant amounts of large-scale HI, often distributed in tail- or bridge-like structures, indicative of a recent galaxy merger or collision. Our results suggest that different types of radio galaxies may have a different formation history, which could be related to ...
Supernova explosions within wind-driven bubbles are studied with 2D hydrodynamical calculations. Two different density distributions for the ejecta are considered: (i) a smooth, unfragmented power-law stratification, and (ii) a fragmented distribution. As in 1D models, the presence of the shell of interstellar swept-up matter causes the rapid evolution of the remnant to the radiative phase. The main 2D effects, for both fragmented and unfragmented ejecta, include: (i) substantial chaotic deviations from a purely radial flow in the remnant interior, (ii) efficient turbulent mixing between the ejecta and the shocked wind, resulting in homogenization of the former wind cavity, and (iii) severe distortion of the wind-driven shell by cooling and Rayleigh-Taylor instabilities. (author).
The principal objective of this study is to formulate an effective optimal fuel management strategy for the TRIGA MARK II research reactor at AERE, Savar. The core management study has been performed by utilizing four basic types of information calculated for the reactor: criticality, power peaking, neutron flux and burnup calculation. This paper presents the results of the burnup calculations for TRIGA LEU fuel elements. The fuel element burnup for approximately 20 years of operation was calculated using the TRIGAP compute code. The calculation is performed in one-dimensional radial geometry in TRIGAP. Inter-comparison of TRIGAP results with other two calculations performed by MVP-BURN and MCNP4C-ORIGEN2.1 show very good agreement. Reshuffling at 20,000MWh step provides the highest core l...
The RESF is utilized for storage of spent fuel under emergency conditions as well as for testing of FM heads. It receives cooling supply from the PHT Pressurizing pumps and after removal of decay heat from the spent fuel it goes to the D2O Storage Tank. The geometry of the RESF system is such that it can not sustain the thermosyphon loop during SBO, due to high frictional forces. To achieve the sustained thermosyphon, modifications in the design were suggested viz., removal of the steam trap and the relief valve above it and replacement by a solenoid valve (SV-16). In the event of SBO, SV-16 will open on 'RESF channel temperature high' signal and connect to FT D2O tank. The tank, being at atmospheric pressure and at lower elevation, will provide higher cooling flow rate through the RESF channel. D2O is periodically removed from the FT D2O tank by operating a Class-II pump intermittently. The analysis was done for the modified RESF system configuration to estimate ...
The stability of a solid ice cover subjected to rapidly varying water levels and discharge was investigated. The support from the bank limits the stress in the ice cover and consequently bank contact must be maintained to ensure ice cover stability. An analysis was required of the stability of ice hinges, a flexible connection between a solid ice cover and the riverbank. Phase II and phase III of the research involved a field study of the Peace River, investigating the evolution of ice hinges with water level variation, from initial ice cover cracking parallel to the banks, to a fully developed hinge. A test program of midwinter discharge variations was undertaken to gather specific data and measurements of ice hinge link length, ice thickness, hinge joint behavior, riverbank geometry, and response of ice hinging to water level variation. This volume of appendices to the study presents detailed observations and comments from field notes through the formation, ...
To understand the environmental dispersion trend of "3H and "1"4C discharged from the Wolsung nuclear power plant, the present levels of "3H and "1"4C in environmental samples in the vicinity of the Wolsong site were studied. During 1992 through 2002, the annual means of HTO and "1"4C concentrations in air collected at three sampling stations around Wolsong nuclear power plant were in the range of 1.13 #approx# 29.2 Bq m"-"3 and 0.33 #approx# 0.40 Bq g-C"-"1 respectively, decreasing with distance from the site. The annual mean of TFWT concentrations in pine needle was in the range of 104 #approx# 790 Bq L"-"1 at N-1 and 62.8 #approx# 298 Bq L"-"1 at S"-"2, while the annual mean of "1"4C concentration was in the range of 0.335 #approx# 0.897 g-C"-"1 at N-1 and 0.254 #approx# 0.332 Bq g-C"-"1 #approx# at S"-"2, showing elevated value than a 0.25 Bq g-C"-"1 of background level. (author)
Research and development activities sponsored by countries within the International Energy Agency`s solar thermal working group. SolarPACES, have helped reduce the cost of solar thermal systems to one-fifth that of the early pilot plants. Continued technological improvements are currently being proven in next-generation demonstration plants. These advances, along with cost reductions made possible by scale-up to larger production and construction of a succession of power plants, have made solar thermal systems the lowest-cost solar energy in the world and promise cost-competitiveness with fossil-fuel plants in the future. Solar thermal technologies are appropriate for a wide range of applications, including dispatchable central-stationpower plants where they can meet peak-load to near-base-load needs of a utility, and distributed, modular power plants for both remote and grid-connected applications. In ...
The windmill industry in Denmark is currently confronted with making a choice between competing technologies so that the role of the stimulus of state subsidies for research has lately increased in importance. The Ministry of Energy, it is claimed, must be aware of this as possibilities for making use of research results are dictated by the market and competition. The industry is not sympathetic to the idea of state research contracts with specified goals for which manufacturers must produce a technical solution. Consultancy firms should work towards solving general problems which could help the industry as a whole. Wind turbines which are cheap to produce and operate are of more interest to industry than those which are technologically advanced or of a lighter construction. It is not thought to be advantageous to concentrate the allocation of subsidies on one key project chosen by the Ministry itself, such as the current intense interest in turbine blades. Aerodynamics, noise ...
The windmill industry in Denmark is currently confronted with making a choice between competing technologies so that the role of the stimulus of state subsidies for research has lately increased in importance. The Ministry of Energy, it is claimed, must be aware of this as possibilities for making use of research results are dictated by the market and competition. The industry is not sympathetic to the idea of state research contracts with specified goals for which manufacturers must produce a technical solution. Consultancy firms should work towards solving general problems which could help the industry as a whole. Wind turbines which are cheap to produce and operate are of more interest to industry than those which are technologically advanced or of a lighter construction. It is not thought to be advantageous to concentrate the allocation of subsidies on one key project chosen by the Ministry itself, such as the current intense interest in turbine blades. Aerodynamics, noise ...
The Externally-Fired Combined Cycle (EFCC) is an attractive emerging technology for powering high efficiency combined gas and steam turbine cycles with coal or other ash bearing fuels. In the EFCC, the heat input to a gas turbine is supplied indirectly through a ceramic air heater. The air heater, along with an atmospheric coal combustor and ancillary equipment, replaces the conventional gas turbine combustor. A steam generator located downstream from the ceramic air heater and steam turbine cycle, along with an exhaust cleanup system, completes the combined cycle. A key element of the EFCC Development Program, the 25 MMBtu/h heat-input Kennebunk Test Facility (KTF), has recently begun operation. The KTF has been operating with natural gas and will begin operating with coal in early 1995. The US Department of Energy selected an EFCC repowering of the Pennsylvania Electric Company`s Warren Station for funding under the Clean Coal Technology ...
11 matches ... 04.17.2002. International Space Station Sports a New Truss + More Details. 04.17 .2002. International Space Station Sports a New Truss ...
The design of the absorber blocks for internal and external dumping of the SPS proton beam is discussed. In addition, the external target stations for slow and fast extracted proton beams are described.
The automatic weather stations at the Australian stations (Casey, Davis, ... This metadata record describes Simone Ingham's survey of vegetation sampling ...
The establishment of the domestic market in Europe requires rules for the assignment of orders, with which a standardization of the rules of competition can be achieved and with which a discrimination of individual bidders can be prevented. Clients and contractors of powerstation equipments equally are affected by the definitions for the assignment of orders. The contribution under consideration is a regulation for the procurement of steam turbine systems. It is a supplement of the European standard DIN EN 45510:1998. The regulation integrates the former terms of delivery of association of the electricity industry (VDEW) for steam turbines as well as the collection and evaluation of a multiplicity of experiences of the VGB regulations.
Description of the current status of the developments of a simulation of the Darlington Nuclear Generating Station shutdown and regulating systems, DARSIM. The DARSIM program simulates the spatial neutron dynamics, the regulations of the reactor power, and shutdown system 1 and shutdown system 2 software. The DARSIM program operates in the interactive simulation (INSIM) program environment. DARSIM was installed on the APOLLO computer at the Atomic Energy Control Board (AECB) and a version for an IBM-PC was also provided for the exclusive use of the AECB. Shutdown system software was updated to incorporate the latest revisions in the functional specifications. Additional developments were provided to assist in the use and interpretation of the DARSIM results.
Tarapur Atomic PowerStation unit-4 is first 540 MWe pressurized heavy water reactor. Heavy water is used as the coolant and moderator. With reactor operation tritium is formed by absorption of neutron by Deuterium atoms. Experience in the 220 MWe indicates that tritium is main contributor to the internal dose of radiation workers. Study on Tritium build up in Primary Heat Transport (PHT) and Moderator (MOD) system was carried out at the initial stage of the operation of the unit-3 and 4. This paper brings out tritium activity buildup in the PHT and MOD systems and its comparison with 220 MWe reactors. This paper helps in estimation of the internal dose contribution to the radiation workers at TAPS 3 and 4. (author)
Tarapur Atomic PowerStation unit-4 is first 540 MWe pressurized heavy water reactor. Heavy water is used as the coolant and moderator. With reactor operation tritium is formed by absorption of neutron by deuterium atoms. Experience in the 220 MWe indicates that tritium is main contributor to the internal dose of radiation workers. Study on tritium build up in Primary Heat Transport (PHT) and Moderator (MOD) system was carried out at the initial stage of the operation of the unit-4. This paper brings out tritium activity buildup in the PHT and MOD systems and its comparison with 220 MWe reactors. This paper helps in estimation of the internal dose contribution to the radiation workers at TAPS 3 and 4. (author)
So far, publications in turbomachinery engineering have tended to neglect the description of control systems and strategies which could be converted into practical guidelines for turbine operation. The contribution describes the powerstation turbine as a basis for modelling the control stage. The solutions will serve as a basis for further type-specific investigations of the problem. [German] Eine vornehmlich regelungstechnisch ausgerichtete Beschreibung des thermodynamisch-mechanischen Wirkungsgeschehens im Bereich der Regelstufe von Dampfturbinen sowie deren Umsetzung in schluessige, betriebsrelevante Aussagen fehlen bislang in der Turbomaschinenliteratur. Im Beitrag werden am Beispiel der Kraftwerksturbine die Grundlagen fuer eine modelltechnische Nachbildung der Regelstufe entwickelt. Die Loesungen dienen als Ausgangsbasis fuer weitere typenspezifische Bearbeitungen dieses Problems. (orig.)
The nickel-rich superalloys Alloy 600 and Alloy 800 have been corroded in mildly alkaline deuterated aqueous conditions typical of secondary coolant circuits in a nuclear powerstation. The oxide films and substrates of these alloys have been analysed by imaging SIMS depth profiling, which makes it possible to describe elemental distribution in all three dimensions. The measurement of the distribution of the secondary ions NiO[sup -], FeO[sup -] and CrO[sup -] appears useful for detailing the behaviour of nickel, iron and chromium within oxidized phases. The measurement of D[sup -] distribution outlines the extent of oxide hydration. For Alloy 800, evidence of sodium migration into the grain boundaries of the alloy substrate is found. For Alloy 600, no grain boundary sodium ingress can be identified under comparable corrosion conditions. (author).
The nickel-rich superalloys Alloy 600 and Alloy 800 have been corroded in mildly alkaline deuterated aqueous conditions typical of secondary coolant circuits in a nuclear powerstation. The oxide films and substrates of these alloys have been analysed by imaging SIMS depth profiling, which makes it possible to describe elemental distribution in all three dimensions. The measurement of the distribution of the secondary ions NiO"-, FeO"- and CrO"- appears useful for detailing the behaviour of nickel, iron and chromium within oxidized phases. The measurement of D"- distribution outlines the extent of oxide hydration. For Alloy 800, evidence of sodium migration into the grain boundaries of the alloy substrate is found. For Alloy 600, no grain boundary sodium ingress can be identified under comparable corrosion conditions. (author).
Research facilities and personnel in high efficiency separation processes for carbon dioxide removal from industrial sources, such as fossil fuel fired powerstations, goal gasification plants, and hydrogen production units for enhanced oil recovery applications at the University of Regina were described. A brief summary of current projects, such as the determination of CO{sub 2} absorption capacity of sterically hindered amines, the formulation of high CO{sub 2} absorption capacity solvents, the search for high performance absorbers and regenerators, studies on material corrosion, and optimization and cost studies of co-production of CO{sub 2} and electricity, was also provided.
BARC has organized an international round robin analysis program to carry out the ultimate load capacity assessment of BARC containment (BARCOM) test model. The test model located in BARC facilities Tarapur, is a 1:4 scale representation of 540 MWe pressurized heavy water reactor (PHWR) pre-stressed concrete inner containment structure of Tarapur Atomic PowerStation (TAPS) unit 3 and 4. The features of the BARCOM test model and the constitutive data for the pre-test analysis along with the comparison of the results submitted by various participants are described in this pre-test report of the round robin analysis of BARCOM test model
Diagnostic systems make it possible to recognize incipient faults in good time and help to increase the availability of powerstations. The thermal efficiency and the effective terminal output are didicated by a number of influences. Deviations from the expected status can be identified via continuous recording of the operating parameters and calculation of derived data. An improved efficiency and economical load distribution lead to considerable cost savings. (orig.) [Deutsch] Die Verarbeitung von Messwerten und Signalen ermoeglicht eine umfassende Beurteilung des Anlagenzustandes und die Erkennung sich anbahnender Veraenderungen. Stoerungen, Schaeden oder eine unwirtschaftliche Betriebsweise koennen fruehzeitig erkannt werden. Erhoehte Verfuegbarkeit, geringerer Brennstoffverbrauch und optimierte Lastaufteilung bringen Kostenvorteile. (orig.)
With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.
A negative public reaction is expected to oppose plans of the British energy industry to take valuable sites for industrial and commercial projects on the ground that government demand forecasts are too high and that they downplay conservation. The United Kingdom (UK) Department of Energy points out that public inquiry always accompanies energy installations and defends the projections made by producers even though each study emphasizes the demand for its own form of energy. At issue are plans to open 150 opencast coal mines a year to compensate for diminishing oil and gas supplies, onshore drilling by oil and gas exploration teams on nearly 50,000 km/sup 2/, and sites required for onshore pipelines, synthetic natural gas facilities, pumped storage plants, and nuclear powerstations and waste management. The sites under discussion raise aesthetic and ecological concerns. (DCK)
Exposure control at the operating Nuclear PowerStation is a major concern. The challenging task of meeting the International standards in the field of radiation protection is the calibration of the radiation monitoring instruments and interpretation of personnel and area monitoring results. Correct interpretation is based on accurate calibration of radiation measuring instruments. The reliability and accuracy of the measurements are also partly based on the procedures applied in calibration. Inadequate calibration can cause large errors in dose estimation in complete dose rate range and energy range. Semiautomatic calibration facility established at TAPS 3 and 4 for radiation monitoring instruments. Objective of calibration facility is (a) Ensure instruments are working properly (b) calibration adjustment and (c) in case without calibration adjustment to reveal the error involved. The calibration facility and calibration techniques established ...
In Tarapur Atomic PowerStation unit-3 and 4, which is 540 MWe pressurized heavy water reactor, tritium is produced in primary heat transport system and moderator system. Tritium is a major contributor to the internal dose. Internal dose contributes about 30% of the collective dose. Internal dose monitoring and its control are important to control the collective dose. Estimation of internal dose is done by analysis of bioassay samples of radiation workers. In a month, about 7000 bioassay samples are analysed for the internal dose assessment during normal operation, and about 12000 during the biennial shut down of the reactor. To enhance the sample preparation and counting performance, minimize the entry errors and reduce the processing time, barcode based label generation system was developed for the internal dose monitoring. This paper discusses about the use of barcode system in the internal dose monitoring at TAPS 3 and 4. (author)
The analysis of transmission line faults is essential to the proper performance of the power system. It is required if protective relays are to take the appropriate action and in monitoring the performance of relays, circuit breakers, and other protective and control elements. The detection and classification of transmission line faults is a fundamental component of such fault analysis. Another application of fault analysis is in software packages for automated analysis of digital fault recorder (DFR) files. Recently, such a package, called DFR Assistant, was developed for substation applications. This program can be installed locally in a substation, in which case it is connected directly to the DFR via a high speed parallel link, or it can be installed at a central station, in which case it can be configured to automatically analyze events coming from all DFRs.
A drift dye tracer experiment, using Rhodamine (WT) dye, was conducted on airborne drift from a natural draft cooling tower at PEPCO's Chalk Point, Maryland Power Generating Station. This experiment was designed to separate and identify cooling tower aerosol deposition from other sources and to provide a data base for use in cooling tower salt loading and model validation. Prior to the experiment, laboratory tests showed that Rhodamine (WT) was inexpensive, safe and controllable when used as a drift dye tracer. Positive identification and separation of cooling tower drift can be made among other sources using a dye tracer.
The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.
Wolsong 2, 3, and 4 are CANDU 6 pressurized heavy water nuclear power plants, each with a gross electrical output of 715 MW(e). The plants were constructed in the Republic of Korea during the 1990s. The three Wolsong units are based on the previous CANDU Wolsong Unit 1, declared in service in 1983. All four units are presently in commercial service. The Wolsong abnormal operating manuals were developed in a cooperative effort between Atomic Energy of Canada Limited, Korea Power Engineering Company staff, and Korea Electric Power Corporation. The role of Atomic Energy of Canada Limited in performing risk assessment studies and supporting CANDU stations for the preparation of emergency operating procedures has greatly benefited the Wolsong abnormal operating manual program. Korea Electric Power Corporation provided training and supervision, Korea Power Engineering ...
A few metal complexes of isatin-isonicotinoylhydrazone with Ni(II), Cr(III), Co(II), Cu(II), Zn(II) and Cd(II) have been prepared and characterized on the basis of elemental analyses, infrared and electronic spectra as well as "1H NMR spectra, conductivity and magnetic measurements. In view of the results obtained, it has been found that two molecules of isatin-isonicotinoylhydrazone are chelated to the central metal ion as bis-uninegative ONO tridentate ligand forming non-electrolytic octahedral metal complexes. (author)
In the RIR (Risk-informed Regulation), PSA (Probabilistic Safety Assessment) plays a major role because it provides overall risk insights for the regulatory body and utility. Therefore, the scope, the level of details and the technical adequacy of PSA, i.e. the quality of PSA is to be ensured for the successful RIR. To improve the quality of Korean PSA, we evaluate the quality of the KSNP (Korean Standard Nuclear Power Plant) internal full-power PSA model based on the 'ASME PRA Standard' and the 'NEI PRA Peer Review Process Guidance.' As a working group, PSA experts of the regulatory body and industry also participated in the evaluation process. It is finally judged that the overall quality of the KSNP PSA is between the ASME Standard Capability Category I and II. We also derive some items to be improved for upgrading the quality of the PSA up to the ASME Standard Capability Category ...
Interpretative transport has been used to revisit the global scalings of TJ-II ECRH plasmas from a local perspective. Density, rotational transform and ERCH power scans were analysed based upon Thomson Scattering data (electron density and temperature) in steady state discharges. A simple formula to obtain the thermal conductivity, assuming pure diffusion and negligible convective heat fluxes was used in a set of 161 discharges. All the analysis was performed with the ASTRA transport shell. The density scan indicates that inside n=0,4 there is no significant change of e with density in the range studied (0.4 <ne>(1019m-3) 1.0), while in 0,5 <0,8 approximately, e decreases with density. In the rotational transform scan it is found that the values of e when a low order rational of the rotational transform is present locally seem to be smaller for the corresponding range, although it is apparent a general beneficial effect of ...
The river Saale cascade consists of seven reservoirs with a total capacity of approx. 415 Mio. m[sup 3]. The entire reservoir system covers a catchment area of 1665 km[sup 2]. The water management tasks extend to the following main fields: flood protection upkeep of minimum water stock, salt load control and power generation. The energy supply capacity of the cascade is mainly used by pumped storage plants. The last of these plants, Hohenwarte II, was put into service in 1963. (orig.)
Pionier-I is a vertical axis wind turbine (VAWT) of the Darrieus-type with a diameter of 15 m. In the month of September 1983 performance and efficiency were measured. Measurements were done with constant rotational speed and with constant tip speed ratio. For the calculation of the possible (theoretical) output of electric power an anemometer was present. Measurement results are conditioned to one digital signal and processed by a microcomputer (Apple II). It becomes evident that the yearly energy output of the Pionier-I is quite well comparable with that of a horizontal axis turbine with the same diameter.
Argon ion laser induced fluorescence measurements were carried out in a multipolar filament discharge with a broadband diode laser centered on 668 nm, which stimulated a transition from the metastable state in Ar(II) 3d4F7/2 to 4p4D05/2. The intensity of the induced fluorescence at 442 nm was maximized by the optimization of the discharge parameters and the laser power. From the recovery of the background fluorescence after the laser was turned off, the ion diffusion coefficient was deduced and compared with the result inferred from the experiments of ion acoustic wave (IAW) damping.
In this study, the state-of-the art for estimating LERF is considered for the regulatory risk-informed decisions. The consideration is mainly focused on (1) the relationship between Level 2 PSA and LERF evaluation methodology, (2) the standard requirements in terms of modeling preparation and the acceptance criteria based on the application capability II of ASME PRA standard, and (3) some pending issues for developing and proposing a simplified LERF model. This study is preliminarily presented and will be updated for establishing detailed evaluation scheme of extended MPAS (multi-purpose probabilistic analysis of safety) model and preparing the technical basis.
We develop a new cavity with a mode similar to TE13 to produce microwave plasma, named APMPS II, which is able to produce a mass of air plasma with diameter of around 6 cm, equipped with about 3 kW input power under one atmosphere. The plasma seems to be homogeneous without significant filamentous discharge as observed by common camera device. We present the theory of this cavity, show the distribution of electric field of several planes inside the cavity and give some experimental results. (authors)
In the early sixties it was decided to investigate salt formations on its suitability to host heat generating radioactive waste in Germany. In the reference repository concept consequently the emplacement of vitrified waste canisters in deep vertical boreholes inside a salt mine was considered whereas spent fuel should be disposed of in self shielding casks (type POLLUX) in horizontal drifts. The POLLUX casks, 65 t heavy carbon steel casks, will be laid down on the floor of a horizontal drift in one of the disposal zones to be constructed in the salt dome at the 870 m level. The space between casks and drift walls will be backfilled with crushed salt. The transport, the handling und the emplacement of POLLUX casks were subject of successfully performed demonstration and in situ tests in the nineties and resulted in an adjustment of the atomic law. The borehole disposal concept comprises the emplacement of unshielded canisters with vitrified HLW in boreholes with a diameter of 60 cm and ...
Off-grid power generation is meant to supply remote or rural area, where grid connection is almost impossible in terms of cost and geography, such as island, aborigine's villages, and areas where nature preservation is concern. Harnessing an abundance renewable energy sources using versatile hybrid power systems can offer the best, least-cost alternative solution for extending modern energy services to remote and isolated communities. The conventional method for off-grid power generation is using diesel generator with a renewable energy (RE) technology utilizing solar photovoltaic, wind, biomass, biogas and/or mini/micro hydro. A hybrid technology is a combination of multiple source of energy; such as RE and diesel generator and may also include energy storage such as battery. In our design, the concept of solar hybrid system is a combination of solar with diesel genset and battery as an energy storage. The main objective ...
A methane catalytic decomposition reactor-direct carbon fuel cell-internal reforming solid oxide fuel cell (MCDR-DCFC-IRSOFC) energy system is highly efficient for converting the chemical energy of methane into electrical energy. A gas turbine cycle is also used to output more power from the thermal energy generated in the IRSOFC. In part I of this work, models of the fuel cells and the system are proposed and validated. In this part, exergy conservation analysis is carried out based on the developed electrochemical and thermodynamic models. The ratio of the exergy destruction of each unit is examined. The results show that the electrical exergy efficiency of 68.24% is achieved with the system. The possibility of further recovery of the waste heat is discussed and the combined power-heat exergy efficiency is over 80%. (author)
A methane catalytic decomposition reactor-direct carbon fuel cell-internal reforming solid oxide fuel cell (MCDR-DCFC-IRSOFC) energy system is highly efficient for converting the chemical energy of methane into electrical energy. A gas turbine cycle is also used to output more power from the thermal energy generated in the IRSOFC. In part I of this work, models of the fuel cells and the system are proposed and validated. In this part, exergy conservation analysis is carried out based on the developed electrochemical and thermodynamic models. The ratio of the exergy destruction of each unit is examined. The results show that the electrical exergy efficiency of 68.24% is achieved with the system. The possibility of further recovery of the waste heat is discussed and the combined power-heat e...
The Fast Wave Current Drive (FWCD) system at DIII-D has increased its available radio frequency (RF) power capabilities with the addition of two new high power transmitters along with their associated transmission line systems. A Sun Sparc-10 workstation, functioning as the FWCD operator console, is being used to control transmitter operating parameters and transmission line tuning parameters, along with acquiring data and making data available for integration into the DIII-D data acquisition system. Labview, a graphical user interface application, is used to manage and control the above processes. This paper will discuss the three primary branches of the FWCD computer control system: transmitter control, transmission line tuning control, and FWCD data acquisition. The main control program developed uses VXI, GPIB, CAMAC, Serial, and Ethernet protocols to blend the three branches together into one cohesive system. The control of the ...
Tarapur Atomic PowerStation Unit-4 is first 540 MWe pressurized heavy water reactor in India. It achieved criticality on 06th March 2005 and then operated at full power i.e 500 MWe. Radiation workers during the normal operation and reactor shutdown are exposed to radiation field. The control of dose rates and the collective dose of the radiation workers is most important for the best performance of the reactor. Experience gained during the operation of the 220 MWe reactors has shown that the Moderator system, primary heat transport system, annulus gas system and moderator cover gas system are the main systems contributing to the dose rate and collective dose. In order to identify the radio nuclides contributing to the radiation field, study was undertaken at TAPS Unit-4. Various samples from the Moderator, primary heat transport system, annulus gas system and moderator cover gas system were collected and analysed for the ...
Early in 1988 RWE decided to overhaul the powerstation at Goldenberg. This was necessary due to the age of the plant, the obligation to supply heat and process steam and recent amendments of environmental legislation. After analysing demands and needs one developed a plant concept with a 290 t/h and a 400 t/h steam generator. Due to lack of space the decision was made in favour of a circulating atmospheric fluidised bed combustion instead of steam generators with pulverised lignite combustion as these steam generators take up much more space due to the legally required desulphurisation plants for gaseous emissions. Apart from generating steam RWE wishes to gain experience with this combustion technology and test it for suitability and use in large-scale plant. (orig./KO) [Deutsch] Aufgrund des fortgeschrittenen Alters, der aktuellen Umweltschutzgesetzgebung sowie bestehender Versorgungsverpflichtungen fuer Waerme und Prozessdampf wurde Anfang ...
The Army Reactor Area (ARA) II was constructed in the late 1950s as a test site for the Stationary Low Power Reactor No. 1 (SL-1). The SL-1 was a prototype power and heat source developed for use at remote military bases using a direct cycle, boiling water, natural circulation reactor designed to operate at a thermal power of 3,000 kW. The ARA II compound encompassed 3 acres and was comprised of (a) the SL-1 Reactor Building, (b) eight support facilities, (c) 50,000-gallon raw water storage tank, (d) electrical substation, (e) aboveground 1,400-gallon heating oil tank, (f) underground 1,000-gallon hazardous waste storage tank, and (g) belowground power, sewer, and water systems. The reactor building was a cylindrical, aboveground facility, 39 ft in diameter and 48 ft high. The lower portion of the building contained the reactor pressure vessel surrounded by ...
Two major developments have given impetus to wider adoption of variable-speed turbine/generators in hydroelectric plants, both essentially environmental: (1) the need for stream-bed stability below river dams, and (2) the need to minimize fish damage. Also, the need to stabilize pumped-storage and generating efficiencies to match extreme changes in head levels has been a driving force. Variable-speed operation in hydro applications is relatively new to North America. In other parts of the world, it has been used in pumped-storage plants since 1971. In the US, and increasing potential exists for variable-speed hydro, considering the 30 pumped-storage plants already in operation and several river plants struggling with high head fluctuations--including four at stations operated by the Bonneville Power Administration. Several modifications to hydro-plant hardware and operating procedures are actively being considered at Bonneville--all of them ...
This paper describes construction procedures to be employed at the Kansk-Achinsk Fuel and Power Generation Complex, where over 8,000 people are employed, and particularly at the Beresovskii-1 surface mine with a planned annual output of 55 million t of coal. Roads are to be built of reinforced concrete slabs, reducing labor consumption by 1.5-2 times, while the use of pile foundations for buildings will reduce the consumption of monolithic reinforced concrete by 2.5 times and labor by 20,000 man days. Similar economies may be achieved by the use of light metal structures. Details are given of the erection of coal storage silos 68 m high using sliding forms. The 15 km transport gallery from the mine to the Beresovskii GREhS-1 powerstation will be constructed using a conveyor method with units weighing up to 50 t, saving up to 25% on labor. Total savings on metal for the Berezovskii-1 mine as a whole will be 2,200 t, ...
In this report, the concept of exergy and the general methodology of the exergetic analysis and the thermoeconomic (combined exergetic and economic) analysis of energy conversion systems are presented. The THESIS (THermodynamic and Economc SImulation System) computer program used for these analyses is briefly described. Detailed mass, energy, exergy and money balances for a reference steam power plant (Harry Allen Station) are shown. The effect of the most important process parameters on the overall efficiency is investigated. A year-by-year and a levelized revenue requirement analysis are presented. The costs of exergy losses are compared with the capital costs and other expenses due to owning and operating each particular plant component. The question whether it is profitable to reduce the exergy losses by increasing these costs and vice versa is investigated. A cost sensitivity analysis including the effect of coal price and average annual ...
There is no possibility to check any inner part at real welded joint at nuclear powerstation (NPS) during operation because any destructive test cannot be used. In practice there is checked surface of weld. There are used four methodical instructions for the check of real welds: 1. The visual inspection, 2. The measurement of hardness, 3. The chemical composition checking and 4. The microstructure replica analysis. It is necessary to know how these information of weld surface are in accordance with characteristics of inner parts of weld. If there is not any difference between surface weld microstructure and internal weld microstructure of experimental weld it is supposed to that there is not any difference in other measured properties of welds. If is changed structural characteristics of microstructure, it is changed also hardness, chemical analysis etc. It was observed that the microstructure of real welds is almost the same with simulated ...
Contents: expansion of pc mill application to plate mill and tandem cold mill; application of cluster type rolling mill (cr mill) for rolling of special steel (illustration); development of on-line roll grinding system with profile meter; development of new type jet pickling; new technology in continuous annealing furnace (illustration); anti-seismic testing system by 3-dimensional shaking table; development of mitsubishi hybrid desulfurization system; field performance of 500 mw advanced coal fired supercritical pressure operation boiler for unit no. 1 of tsuruga thermal powerstation, hokuriku electric power co., inc.; development of electronically controlled cylinder liner lubrication system for marine diesel engines; prediction technology on steady-state and transient performance of multi-air conditioners; a knowledge-based system approach to the autonomous piloting and navigation control of ships.
The U.S.A. is currently spending hundreds of millions of dollars on coal liquefaction research and this is aimed at improving the German processes to give better yields at lower temperatures and pressures using regenerable, instead of throw-away, catalysts. In assessing the various processes it should be remembered that Australia's requirements are different from those of America. American work is mainly directed to producing a clean, low sulphur, low ash, fuel(solid, liquid or gaseous) particularly from their high sulphur Eastern coals, in order to release for other purposes the very large quantities of oil and gas used in the U.S.A. each year in powerstations. Obviously there is no scope for this approach in Australia, where over 90% of electricity is produced already from coal and where there are adequate resources of low sulphur coals to meet Australia's forseeable power requirements. ...
Concerning the above, it is discussed whether such a system is feasible in Japan. A zinc/air cell system requires some special plants for zinc regeneration, etc. It is necessary to build a zinc refining plant and to install dozens of electrode replacing facilities in an area dozens of kilometers in diameter with the plant at the center. For such a system to be functional, there have to be several tens of thousands of automobile users in a limited area. In Japan, so large a number will not be found anywhere even if the appeal is directed to those in the postal service and electric utilities. There will be no economic success in Japan, different from in Germany. As for the economic comparison between a zinc/air cell system and natural gas system, the two will be equivalent to each other as far as the use of the quick filling stations for the natural gas automobiles remains as it is. When the number in consideration is so large as several tens of thousands, however, ...
The DGs (Diesel Generators) in NPP (Nuclear Power Plant) has been used for the emergency electric power source to shot down the nuclear reactor safety in case of station blackout. The RCM (Reliability Centered Maintenance) has been applied to DGs for increasing the safety of NPP. The structured defects of DG were not remedied by the improvement of maintenance method. As the first stage of RCM, to find the structured defect, its failure= models were searched and analyzed through the ten year maintenance information. The structured defects such as the air compressor, the lubricating oil pressure, and the insufficient load were the root causes of main failures. The air reservoir reinstallation, the lubricating oil tube modification, the load bank installation, and the qualitative instrumentation were the solutions for the hardware oriented RCM of DGs. There remains the software oriented RCM such as the rejection of useless ...
In July 1997, a field inspection was carried out of parts of the tunnel system of the Tonstad hydroelectric powerstation, Norway. This report discusses the findings: (1) The main drift has a varying bottom covering of sediments, (2) The tunnel to Ousdal had on its downmost 2 km an almost unbroken and apparently stable armour layer along the walls and an unstable or incomplete armour layer in the middle, (3) The tunnel to Homstoel almost had no bottom layer, (3) Sediments in side inlets and niches are of two kinds: (a) masses added through side inlets, (b) fine sand and mud deposited by the main tunnel, (4) A few cases were observed of downfallen rocks and of peeled rock of about 1 m size. It looks as if the Homstoel tunnel may have been previously used for larger discharges than that from Ousdal and that the latter is now being used to the limit of what the previously established armour layer can stand
This report describes a comparison result of technical standards applied to instrumentation and control systems for nuclear power plants between in Korea and in Russia. Russia also has a state-run organization authorized to conduct approval, cancellation, and audit in use of nuclear facility or equipment. The Russian standards for nuclear instrumentation and control equipment are analogous with the Korean ones in the aspect of basic concepts and principles. However, there are some differences in document structure, design requirements, qualification test items, depth of contents between two standard systems. The biggest deviation exists in the standard documents for seismic qualification and electromagnetic interference qualification. Korean seismic qualification standard utilizing US approach, defines testing and qualification methods specifically and clearly. Russian standards however provide only conceptual definitions and requirements in the seismic related ...
The Potomac Electric Power Company generating station at Chalk Point, MD, utilizes brackish water in its natural draft cooling tower and, consequently, releases saline aerosol into the atmosphere. A research and monitoring project was established in 1974 to evaluate the effects of this drift on native perennial vegetation. Leaf samples have been collected form dogwood, Cornys florida, Virginia pine, Pinus virginiana, black locust, Robinia pseudoacacia, and sassafras, Sassafras albidum, located at 12 different sites in the vicinity of the power plant. Sampling was begun prior to the operation of the cooling tower, 1974, and continued through 1978. Complete results from monthly monitoring of foliar chloride in the four native tree species is documented for May through September 1978. Results from salt spray experiments indicate chloride and sodium concentrations in the wood of dogwood trees increases with increased spraying ...
Research and development and other activities of the various constituent units of Department of Atomic Energy (DAE) and also of the institution aided by DAE for the year 2005-2006 are reported. The various constituents units of DAE consist of nuclear research centres, nuclear powerstations, fuel reprocessing and heavy water plants, nuclear fuel fabrication facilities, electronic and instrumentation production organisations, atomic mineral processing units and other nuclear installations. The activities of DAE cover the whole gamut of nuclear fuel cycle, research and development in nuclear science and reactor technology, applications of radiation and radioisotopes, radiation protection, research and development in front line areas such as robotics, lasers, mathematics and computational sciences. International research collaborations like CERN-DAE collaboration were completed by BARC. These activities are described broadly under: executive ...
The object of this research is the evaluation of the performance of ultra high speed relays (UHSR's) used for protection of a-c transmission lines. For purposes of this report, these are relays whose response time is less than a quarter of a cycle of the 60 Hz wave (i.e. 4.167 ms.). To identify relaying schemes that may comply with this definition, a literature survey was undertaken. The selected relays were studied in detail and modeled on a digital computer. A theoretical description of these relays is presented. Records of real transient data as well as of simulated data were used as input to the digital models of relays. The real data were recorded by means of monitoring stations connected to the Florida Power and Light Company transmission lines. The simulated data were obtained by modeling the relevant parts of the utility's transmission system using a University of British Columbia simplified version of the well known ...
This paper contains literature from American Power Conference Air Toxics Being Measured Accurately, Controlled Effectively NO{sub x} and SO{sub 2} Emissions Reduced; Surface Condensers Improve Heat Rate; Usable Fuel from Municipal Solid Waste; Cofiring Technology Reduces Gas Turbine Emissions; Trainable, Rugged Microsensor Identifies of Gases; High-Tc Superconductors Fabricated; High-Temperature Superconducting Current Leads; Vitrification of Low-Level Radioactive and Mixed Wastes; Characterization, Demolition, and Disposal of Contaminated Structures; On-Line Plant Diagnostics and Management; Sulfide Ceramic Materials for Improved Batteries; Flywheel Provides Efficient Energy Storage; Battery Systems for Electric Vehicles; Polymer-Electrolyte Fuel Cells for Transportation; Solid-Oxide Fuel Cells for Transportation; Surface Acoustic Wave Sensor Monitors Emissions in Real-Time; Advance Alternative-Fueled Automotive Technologies; Thermal & Mechanical Process; ...
Platinum(II) complexes have been investigated in the hydration of alkynes. These catalysts offer improved regioselectivity over Hg(II) counterparts. 1 fig., 2 tabs.
During the 2007 Niigataken Chuetsu-oki earthquake, strong ground motion with the peak acceleration of 680 cm/s/s which was larger than that of the empirical prediction was recorded at the base mat of the No.1 reactor building of Kashiwazaki-Kariwa Nuclear PowerStation (NPS). Furthermore, in the Kashiwazaki-Kariwa NPS, over twice difference of 680 vs. 322 cm/s/s of peak acceleration between the No.1 and the No.6 reactor buildings was observed on the base mat. From the results of recent research, it is suggested that the deep sedimentary layers can be one of the important factors to elucidate these phenomena. In this study, at first, the applicability of microtremor array measurements for estimation of deep S-wave velocity structure (#approx#Vs=3 km/s layer) are discussed. Vertical microtremors were observed in three arrays at the Kashiwazaki-Kariwa NPS with the maximum station spacings of 3.04 km, 1.49 km and 0.75 km, ...
Effective commercial liquid absorption technology currently applicable for CO{sub 2} capture from power plant flue gases uses a conventional chemical solvent, MEA(monoethanolamine), which was developed over 60 years ago as general non selective solvent to remove acid gases from natural gas streams. The application to CO{sub 2} capture from almost atmospheric pressure flue gases required modification of the technology on account of the oxygen content to incorporate inhibitors to resist solvent degradation and equipment corrosion, as well as upstream treatment of the flue gases to remove both SO{sub x} and NO{sub x} present. The solvent strength used by such processes is relatively low in comparison with high strength modern chemical solvents. The resultant effect is large equipment and high regeneration energy requirements which is a parasitic load on the power plant. Using current technology for CO{sub 2} capture from flue gas derived from ...
Water-resources data for the 1993 water year for Texas are presented in four volumes, and consist of records of stage, discharge, and water quality of streams and canals; and stage, contents, and water quality of lakes and reservoirs; and water levels and water quality of ground-water wells. Volume 3 contains records for water discharge at 134 gaging stations; stage only at 1 gaging stations; stage and contents at 13 lakes and reservoirs; water quality at 81 gaging stations; and data for 30 partial-record and 4 flood-hydrograph partial-record stations. Also included are lists of discontinued surface-water discharge or stage-only stations and discontinued surface-water-quality stations; crest-stage and flood-hydrograph partial-record stations, reconnaissance partial-record stations, and low-flow partial-record ...
This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites ...
Preserving customers` investments in capital goods is one of the strategic market services offered by ABB, and to this end the company has developed project-specific retrofit concepts especially for older power generation plant. A prime example of such a modernization is the Umm Al Nar East (UANE) combined cycle powerstation in Abu Dhabi, UAE. UANE has two gas turbines of type GT13D, which together generate 140 MW of electrical energy, and heat-recovery boilers which supply steam to a seawater desalination plant with a capacity of 80 million liters of drinking water per day. After almost 20 years in operation, UANE is being modernized. To address the owner`s concerns and minimize plant downtime, ABB has introduced Service, Operation and Rehabilitation (SOR) Key Account Management for Abu Dhabi. In the first phase of the modernization project, the static starting equipment was upgraded and the mechanical turbine governor ...
Observations of the Type II-P (plateau) Supernova (SN) 1999em and Type IIn (narrow emission line) SN 1998S have enabled estimation of the profile of the SN ejecta, the structure of the circumstellar medium (CSM) established by the pre-SN stellar wind, and the nature of the shock interaction. SN 1999em is the first and only Type II-P detected at both X-ray and radio wavelengths. It is the least radio luminous and one of the least X-ray luminous SN ever detected (except for the unusual and very close SN 1987A). The Chandra X-ray data indicate non-radiative interaction of SN ejecta with a power-law density profile (rho \\propto r^{-n} with n ~ 7) with a pre-SN wind with a low mass loss rate of ~2 \\times 10^{-6} Msun/yr for a wind velocity of 10 km/sec, in close agreement with radio mass-loss rate estimates. The Chandra data show an unexpected, temporary rise in the 0.4--2.0 keV X-ray flux at ~100 days after explosion. SN ...
Angiotensin II has adverse actions in heart failure including vasoconstriction, aldosterone secretion, and activation of the sympathetic nervous system. Valsartan, a potent specific angiotensin II type 1 receptor blocker, may produce beneficial effects in heart failure. The purpose of this study was to evaluate the steady-state pharmacokinetics of valsartan 40, 80, and 160 mg each given every 12 h for 7 days in heart failure patients. Eighteen patients with chronic stable heart failure and left ventricular ejection fractions power model, showed that doubling the dose increased the AUC and Cmax 1.8 times. The pharmacokinetics of valsartan are predictable in heart failure patients within the dose range of 40-160 mg BID. Age did not appear to have influenced the valsartan clearance in heart failure patients. The pharmacokinetic values were higher in heart failure patients than in healthy volunteers. All doses were generally ...
Within the scope of the German reactor safety research the thermohydraulic computer code ATHLET which was developed for accident analyses of western nuclear power plants is more and more used for the accident analysis of VVER-plants particularly for VVER-440,V-213. The experiments with the HORUS-facilities and the analyses with the ATHLET-code have been realized at the Technical University Zittau/Goerlitz since 1991. The aim of the investigations was to improve and verify the condensation model particularly the correlations for the calculation of the heat transfer coefficients in the ATHLET-code for pure steam and steam-noncondensing gas mixtures in horizontal tubes. About 130 condensation experiments have been performed at the HORUS-II facility. The experiments have been carried out with pure steam as well as with noncondensing gas injections into the steam mass flow. The experimental simulations are characterized as accident simulation tests ...
The polarization of extracted SATURNE II proton beam as a function of different ion source configurations was studied. Two distinct experiments were necessary for this purpose. In the first one, the left-right instrumental asymmetry of the beam polarimeter was determined using an unpolarized beam. In the second one this correction factor was applied to asymmetries measured with the beam from the polarized ion source in all polarization states. The measurements were carried out at the proton beam kinetic energy 0.80 GeV, where the pp-elastic scattering analyzing power is near its maximum. The results confirmed that the two so-called ``unpolarized states`` of the source were polarized to several percent, whereas the absolute values of the beam polarizations in the so-called ``polarized states`` were equal and opposite. It was observed that the hexapole lens of the ion source produced beam polarization in the absence of any transition. The beam ...
Over the past three decades, rising competition from television and other new media prompted the FCC to ease the responsibilities of radio stations to maintain extensive records of issues programming, while retaining the responsibility of stations to provide ready public access to records. This study investigated the availability of Issues-Programs Lists in nearly 100 Missouri radio station Public Files. One in five randomly sampled stations failed to produce access to Lists upon demand as required under federal law. Noncompliance themes include: Inability to access Public Files within 20 minutes of face-to-face requests; station personnel with limited or no knowledge of Files; denial of access to Files and Lists (i.e., verbal refusals, locked studio doors); and incomplete Files. The rate ...
Effective teamwork among station work groups is essential for plant production and safety in all phases of plant operation. To achieve effective teamwork, all contributing work groups must have ongoing access to and share a common perspective on station work priorities, and recognize how their individual contributions fit with and support the contributions of other groups in support of the larger station goals. Achieving and maintaining this alignment in perspective across all workgroups can be a challenge in large organizations. This paper discusses the experience at Darlington in building and maintaining station teamwork among the station workgroups in support of day-to-day plant operations. The issues encountered and the resource impacts of specific teamwork supporting practices adopted are outlined. (author)
In this work, a model for determining the optimal inspection and replacement periods of the safety system in Wolsung Nuclear Power Plant Unit 1 is developed, which is to minimize economic loss caused by inadvertent trip and the system failure. This model uses cost benefit analysis method and the part for optimal inspection period considers the human error. The model is based on three factors as follows: (i) The cumulative failure distribution function of the safety system, (ii) The probability that the safety system does not operate due to failure of the system or human error when the safety system is needed at an emergency condition and (iii) The average probability that the reactor is tripped due to the failure of system components or human error. The model then is applied to evaluate the safety system in Wolsung Nuclear Power Plant Unit 1. The optimal replacement periods which are calculated with proposed model differ ...
Argentina has two operating PHWR nuclear power plants. Atucha I NPP is a pressure vessel type heavy water reactor of 360 MW e with 25 years of operation and Embalse NPP is a pressure tube type CANDU-600 reactor of 640 MW e. Atucha II, a third plant of 600 MW e of the pressure vessel type similar to Atucha I, is being constructed. NASA (Nucleoelectrica Argentina S.A.) currently operates both nuclear power plants. The National Atomic Energy Commission (Comision Nacional de Energia Atomica - CNEA) provides operational support to the plants, including research and development assistance, and actual technical services and maintenance work in different areas. The Chemistry Department, formerly the Reactor Chemistry Department has carried out project and support activities to the plants during the past 20 years. The aim of this work is to describe the present organization and the activities in reactor chemistry of the Chemistry ...
The NUclear Power Engineering Corporation (NUPEC) has developed IMPACT-SAMPSON code to analyze integral behavior of light water nuclear power plants under severe accident conditions. IMPACT-SAMPSON's distinguishing features include interconnected hierarchical modules and mechanistic models covering a wide spectrum of scenarios ranging from normal operation to severe accident events, and high-speed simulation on parallel processing computers. The integral plant behaviors of typical PWR and BWR under severe accident conditions have been analyzed with the IMPACT-SAMPSON code. The PWR plant analyzed was the three-loop, steel-dry containment type with 2,440 MWt. The AE accident scenario was supposed, that is, LOCA by 6-inch hot leg failure followed by accumulated water injection, but no ECCS and containment spray activation. The BWR plant analyzed was the 3,293 MWt BWR-5, Mark-II containment type. The TQUV accident ...
This proceedings volume comprises 17 papers on the following subjects: Methane hydrates, compounds of gas and water; Compressed air stroage gas turbine power plants / Scheduled application for load levelling between varying wind power production and power demand; Modern pumped storage powerstations in the GW range - the PSW Goldisthal example; Lead batteries - new developments and future applications; Alkaline battery systems for hybrid electric road vehicles; Lighium systems and their applications; Zinc/air cells; Hydrogen storage - metal hydride storage, compressed gas storage, LNG storage; Carbon nanofibres for hydrogen storage; Double-layer condensers - technology, cost, perslpectives; Supercondensers in motor vehicles; Superconducting magnetic energy stores; Flywheel storage - status report; Decentralized energy storage in the European integrated supply grid - the EU project ...
On the 8 and 9 May 2002 representatives of the National Radiological Protection Board (NRPB) performed a radiofrequency electromagnetic field survey in the Cookridge area of Leeds in order to assess exposure to radio signals from transmitters mounted on a water tower/a lattice tower and a radio station tower. Guidelines on limiting exposure to radio signals have been published by NRPB and the International Commission on Non-Ionizing Radiation Protection (ICNIRP). These guidelines are designed to prevent established adverse effects on human health. During this survey, the total exposures due to all radio signals from 30 MHz to 18000 MHz (18 GHz) were measured. This frequency range was chosen as it includes mobile phone base station transmissions, which are at around 900 and 1800 MHz and super high frequency (SHF) transmissions from most of the large microwave dish antennas mounted on the towers. In addition, other major sources of radiofrequency ...
This study resumes the discovery of an excess of actinium 227 found around by EL4 nuclear reactor actually in dismantling. The search for the origin of this excess revealed a real inquiry of investigation during three years. Because a nuclear reactor existed in this area a particular attention will have concerned this region. The doubt became the line of conduct to find the answer to the human or natural origin of this excess. Finally and against any evidence, it appears that the origin of this phenomenon was natural, consequence of the particular local geology. The detail of the different investigations is given: search of a possible correlation with the composition of elevations constituent of lanes, search (and underlining) of new sites in the surroundings of the Rusquec pond and the Plouenez station, study of the atmospheric deposits under winds of the nuclear power plant and in the east direction, search of a possible relationship with the ...
The GEOFLOW I experiment has been successfully performed on the International Space Sta-tion (ISS) in 2008 in the Columbus module in order to study the stability, pattern formation and transition to turbulence in a viscous incompressible fluid layer enclosed in two concentric co-rotating spheres subject to a radial temperature gradient and a radial volumetric force field. The objective of the study is the experimental investigation of large scale astrophysical and geophysical phenomena in spherical geometry stipulated by rotation, thermal convections and radial gravity fields. These systems include earth outer core or mantle convection, differen-tial rotation effects in the sun, atmosphere of gas planets as well as a variety of engineering applications. The GEOFLOW I experimental instrument consists of an experiment insert for operation in the Fluid Science Laboratory, which is part of the Columbus Module of the ISS. It was first launched in February 2008 together ...
Some important thermal hydraulic parameters of the 3 MW TRIGA MARK-II research reactor operating under transient condition were investigated using two computer codes PULTRI and TEMPUL. Major transient parameters, such as, peak power and prompt energy released after pulse, maximum fuel and coolant temperature, surface heat flux, time and radial distribution of temperature within fuel element after pulse, fuel, fuel-cladding gap width variation, etc. were computer and compared with the experimental and operational values as reported in the safety Analysis Report (SAR). It was observed that pulsing of the reactor inserting an excess reactivity of $2.00 shoots the reactor power level to 854.353 MW compared to an experimental value of 852 MW; the maximum fuel temperature corresponding to this peak power was found to be 846.76"o C which is much less than the limiting maximum value of fuel temperature of ...
Korea Atomic Energy Research Institute, using the ANS Low Power /Shutdown (LPSD)PRA Standard, evaluated the LPSD PSA model of the KSNP, Younggwang (YGN) Units 5 and 6, and identified the items to be improved. The evaluation results of human reliability analysis (HRA) of the pre-accident human errors in the LPSD PSA model of the KSNP showed that 13 items among 15 items of supporting requirements for those in the ANS PRA Standard were identified as them to be improved. Thus, we newly carried out a HRA for pre-accident human errors in the LPSD PSA model for the KSNP to improve its quality. We considered potential pre-accident human errors for all manual valves and control/instrumentation equipment of the systems modeled in the KSNP LPSD PSA model except reactor protection system/ engineering safety features actuation system. We reviewed 160 manual valves and 56 control/instrumentation equipment. The number of newly identified pre-accident human errors is 101. Among ...
Korea Atomic Energy Research Institute, using the ANS low power and shutdown (LPSD) probabilistic risk assessment (PRA) Standard, evaluated the LPSD PSA model of the KSNP, Yonggwang Units 5 and 6, and identified the items to be improved. The evaluation results of human reliability analysis (HRA) of the post-accident human errors in the LPSD PSA model for the KSNP showed that 10 items among 19 items of supporting requirements for those in the ANS PRA Standard were identified as them to be improved. Thus, we newly carried out a HRA for post-accident human errors in the LPSD PSA model for the KSNP. Following tasks are the improvements in the HRA of post-accident human errors of the LPSD PSA model for the KSNP compared with the previous one: Interviews with operators in the interpretation of the procedure, modeling of operator actions, and the quantification results of human errors, site visit. Applications of limiting value to the combined post-accident human errors. ...
Rocker Peter Frampton and his band are introduced by astronaut Ron Garan to Commander Mike Fossum and Flight Engineers Satoshi Furukawa and Sergei Volkov aboard the International Space Station during a visit to Mission Control in Houston.
Gentilly 2, Point Lepreau, Cordoba and Wolsung are the first 600 MW CANDU nuclear generating stations to be built. Progress in their construction and in the remaining design work for these stations is discussed. (LL).
Expedition 22 Commander Jeff Williams, aboard the International Space Station 220 miles above Earth, responds to questions posted on YouTube concerning the station's orientation, life in space and the recent butterfly experiment.
The purpose of the Utility Applications Program is to provide information and assistance to interested utilities on central station energy storage systems. Compressed air and underground pumped hydroelectric energy storage are the primary technical focus. Smaller utilities are the primary targets of this program, as they may not have resources to track and utilize new energy conservation developments. The program, initiated during this year-long period, consists of a series of tasks integrating and supporting energy storage implementation. Program management and technical coordination activities monitor the wide range of research ongoing both under government support and in industry and provide a locus for dissemination of results. Recently completed DOE demonstration studies provide the central data base and the DOE CAES and UPH Technology Program activities provide another major resource. In addition a UPH preliminary feasibility study in coorination with Central ...
This paper presents an uplink capacity analysis and interference avoidance technique for a femtocell based two-tier DS-CDMA network using shared spectrum. Assuming randomly distributed macrocell users and femtocell base stations (BS), we evaluate a network-wide area spectral efficiency metric called the operating contour (OC) defined as the feasible combinations of the average macrocell users and femtocell BS per cell-site that meet a target outage constraint $\\epsilon$. A contribution of this work is an accurate characterization of the uplink outage probability taking cross-tier power control, path-loss and shadowing effects into account. We show that a time-hopped CDMA physical layer coupled with sectorized receive antennas shows dramatic performance improvements in both light and heavily loaded two-tier networks, relative to a split spectrum two-tier network with omnidirectional femtocell antennas. These results provide insights into design ...
Meteorological and air-quality data, as well as surface tracer concentration values, were collected during 1990 to assess the impact of Navajo Generating Station (NGS) emissions on Grand Canyon National Park (GCNP) air quality. These data have been used in the present investigation to determine between direct and indirect transport routes taken by the NGS plume to produce measured high-tracer concentration events at GCNP. Results show that complex-terrain features affect local wind-flow patterns during winter in the Grand Canyon area. Local channelling, decoupled canyon winds, and slope and valley flows dominate in the region when synoptic systems are weak. Direct NGS plume transport to GCNP occurs with northeasterly plume-height winds, while indirect transport to the park is caused by wind direction shifts associated with passing synoptic systems. Calculated polluted airmass positions along the modeled streak lines match measured surface-tracer observations in ...
PWR plants have made efforts to maintain the long-term integrity of the steam generators (SG) by reducing the amount of corrosion products entering the secondary side of the SG. Iron entered the SG can cause several problems: degraded heat conductivity of the SG tubes in locations where iron is deposited, water level oscillations in the SG due to tube support plate hole blockage, and initiation and propagation of inter-granular attacks (IGA) and stress corrosion cracking (SCC). One of the most effective measures, high all-volatile treatment (AVT) chemistry has been applied to actual plants to reduce the flow-accelerated corrosion (FAC) coming from the carbon steel piping. The secondary water chemistry at Genkai NPS 1 and 2 changed, from the Low AVT chemistry to the High AVT chemistry, in November 2006. In this paper, we will describe the results of experiments in applying the use of High pH water in the secondary water system at Genkai NPS. (author)
One of the most loaded parts of a steam generator of VVER 440 MW type are the bolts and thread holes of the primary collector cover sealing set. The strength calculations and tensometric measurings performed during operation proved the high degree of a load on the bolts. The conditions of the stress limitation are not met in some cases according to the pertinent standards. The untightnesses at nickel rings occurred during putting the units of Jaslovske Bohunice and Dukovany nuclear powerstations into operation. With regard to improve the reliability, the producer has taken measures to improve the quality of the rings and users have introduced more strict regulations for bolts tightening. Due to these measures the high reliability of the set has been obtained from point of view of the tightness, but substantial reduction of bolts and holes threads loading have not been obtained. Several years operation experience proved relatively low service ...
When a nuclear powerstation was installed on the Meuse in central Belgium, the impact of thermal, radioactive, and chemical waste on the water of the Neuse and on its biocenoses was studied. Three successive periods of development of the channel bed and the flood plain in Belgium have occurred, and their hydrological, physicochemical, and ecological consequences have been examined. Since the last century, the ecosystem of the Meuse has undergone, due to the increasing activity of man, modifications of increasing importance: marked reduction of the water flow, a drastic increase in the suspended material being transported, a degree of eutrophication of the water, and the disturbance of the original floral and faunal communities. The causes of this evolution of the Meuse can be itemized as different types of human interference in descending order of importance: (1) occupation of the catchment area; (2) encroachment on the flood plain; (3) ...
The following industrial-scale powerstation processes are compared with natural gas/light fuel oil heating: Conventional steam generation, steam generation with gas turbine upstream, gas turbine process with low-pressure-waste heat boiler and cogeneration. Industrial gas turbines between 10 and 25 MW are compared with one another; typical boilers and industrial turbines are described. CO{sub 2} and NO{sub x} emissions are indicated. The steam turbines used are the efficient and robust turbines used in industry, wherever possible they are built as single-line plant with the gas turbine. (orig.) [Deutsch] Es werden folgende Industriekraftwerksprozesse mit Erdgas-Leichtoelfeuerung verglichen: Konventioneller Dampfprozess, Dampfprozess mit Vorschaltgasturbine, Gasturbinenprozess mit ND-Abhitzekessel und Kombianlage. Die Industriegasturbinen zwischen 10 und 25 MW werden gegenuebergestellt und typische Kessel und Industrieturbinen vorgestellt. ...
The report presents the results of the study carried out to estimate the accident risk involved in the transport of spent fuel from Rajasthan Atomic PowerStation near Kota to the fuel reprocessing plant at Tarapur. The technique of probabilistic safety analysis is used. The fuel considered is the Indian pressurised heavy water reactor fuel with a minimum cooling period of 485 days. The spent fuel is transported in a cuboidal, naturally-cooled shipping cask over a distance of 822 km by rail. The Indian rail accident statistics are used to estimate the basic rail accident frequency. The possible ways in which a release of radioactive material can occur from the spent fuel cask are identified by the fault tree analysis technique. The release sequences identified are classified into eight accident severity categories, and release fractions are assigned to each. The consequences resulting from the release are estimated by the computer code RADTRAN ...
In the fuel testing facilities of Japan Atomic Energy Research Institute, the post-irradiation test of practical fuel used in nuclear powerstations was begun in December, 1979, and the soundness of practical fuel has been confirmed, and the valuable post-irradiation test data on the behavior of fuel have been acquired. Recently, the heightening of fuel burnup has been advanced, and also in fuel testing facilities, the development and preparation of the post-irradiation testing facility required for examining in detail high burnup fuel have been carried out. The course of the installation of the post-irradiation testing facility and the outline of the facility are reported. As the preparation of the post-irradiation testing facility for high burnup fuel, a hyperfine hardness tester that measures dynamic hardness, the measuring instrument for pellet thermal diffusion rate by laser flash method, the measuring instrument for pellet melting point ...
With the practice of 10 years safe operation, Daya Bay Nuclear PowerStation has established and continuously improved the management system for radiation protection and optimization (ALARA) which contains 3 basic requirements: all workers are trained, all employees are engaged in totally, and work management is implemented for the whole process. At the same time, strong efforts have been made to build the 'infrastructure' as a platform for its effective operation. This article introduces the contents and characteristics of the system and basic experiences of its effective implementation. In order to implement the management system effectively, it is necessary for NPPs to strengthen the responsibility system for radiation protection and the leading role of the radiation protection personnel, especially the role of technical support and supervision during the work with high radiation risk, emphasize the organic combination and actively mutual ...
With a pilot electrostatic precipitator having wider plate spacings than usual tests were performed under industrial conditions. In the two-section two-duct pilot precipitator with a precipitation area of 60 m/sup 2/ the plate spacing was increased up to 1,000 mm. As gas velocities values between 0.5 and 2.0 m/s were selected. The precipitator was tested with the flue gases of a coal-fired powerstation and in the room dedustion of an iron ore sintering plant. Starting with a plate spacing of 250 mm increasing the spacing results initially in a small increase of the precipitation rate. After reaching a maximum the rate decreases and finally with passing a critical spacing it goes below the initial value. Dedusting flue gases the spacing with the maximum and the critical spacing depend on the gas velocity. Cost analyses demonstrate that increasing the up to now used plate spacings may led to considerable savings. Depending on the kind of ...
The Chuetsu-oki Earthquake strongly shook the Kashiwazaki-Kariwa Nuclear PowerStation with the ground motions exceeding the design values. The incidents include a fire breakout of the Unit 3 transformer, a release of spilled water containing small amount of radioactive materials to the non-radiation control area and subsequently to the environment at Unit 6, and a release of radioactive material from the main turbine condenser through the main stack of Unit 7 due to the delay stooping the turbine gland steam ventilator by the operator in manually, while every unit in operation was safety shutdown in the automatic mode ensuring the three fundamental safety functions of (a) reactivity control, (b) removal of heat from the core and (c) confinement of radioactive materials. Following integrity evaluation and performance testing of the overall plant, seismic safety of buildings, structures, equipment and pipelines on the basis of the basic ...
Grid connected photovoltaic systems is one of the most promising applications of photovoltaic systems. These systems are employed in applications where utility service is already available. In this case, there is no need for battery storage because grid power may be used to supplement photovoltaic systems (PV) when the load exceeds available PV generation. The load receives electricity from both the photovoltaic array and the utility grid. In this system, the load is the total electrical energy consumption. The main objective of the present work is to optimize the electrical load pattern in Kuwait using grid connected PV systems. In this situation, the electric load demand can be satisfied from both the photovoltaic array and the utility grid. The performance of grid connected photovoltaic systems in the Kuwait climate has been evaluated. It was found that the peak load matches the maximum incident solar radiation in Kuwait, which would emphasize the role of using ...
A computer program for optimization of modular cogeneration plants is introduced. Computer calculation fundamentals are discussed referring to examples which elucidate the verification of the calculated data by measured data or empirical values. The results obtained as one optimizes plants by varying their size or by splitting them into modules are introduced referring to examples. Sensitivity analyses are made to investigate the influence of parameters such as fuel prices, electricity tariffs and interest rates. (orig.) [Deutsch] Im vorliegenden Beitrag wird ein Computerprogramm zur Optimierung von BHKW-Anlagen vorgestellt. Zunaechst werden in einem ersten Schritt die Berechnungsgrundlagen an einem Beispiel in Hinblick auf ihre Ueberpruefung durch Messdaten oder durch Erfahrungswerte diskutiert. Dann werden in einem zweiten Schritt exemplarisch die Ergebnisse einer Optimierung durch Variation der Gesamtanlagengroesse auf Aufsplittung der Anlage in Module vorgestellt. Schliesslich wird ...
In the nuclear powerstations of GDR the rough radioactive waste includes borat-containing evaporator bottoms and spent ion exchanger resins. For its final disposal in deep geological formations (rock salt mines) this waste has to be solidified. The experience of one year lasting operation of a steam heated thin-film evaporator (heating surface 2 m{sup 3}) for evaporator bottoms to be solidified with a solid content of 200-250 g/l are reported on. In short time such amount of water is abstracted from the rough waste that due to the borate content a hot high-viscous product passes from evaporator to waste drum and there solidifies like glass to monolith. The product quality depends on the adjustment of the flow-equilibrium in the evaporator. Boric acid is used as matrix for the radioactive residues. The residual water content of the solidified waste product was about 15-20%, the volume reduction was V{sub f}=5...6. In order to be sure to get a ...
In the nuclear powerstations of GDR the rough radioactive waste includes borat-containing evaporator bottoms and spent ion exchanger resins. For its final disposal in deep geological formations (rock salt mines) this waste has to be solidified. The experience of one year lasting operation of a steam heated thin-film evaporator (heating surface 2 m"3) for evaporator bottoms to be solidified with a solid content of 200-250 g/l are reported on. In short time such amount of water is abstracted from the rough waste that due to the borate content a hot high-viscous product passes from evaporator to waste drum and there solidifies like glass to monolith. The product quality depends on the adjustment of the flow-equilibrium in the evaporator. Boric acid is used as matrix for the radioactive residues. The residual water content of the solidified waste product was about 15-20%, the volume reduction was V_f=5...6. In order to be sure to get a solidified ...
Liberalisation of the energy market will lead to enhanced use of environment-friendly, high-efficiency combined-cycle powerstations - a great challenge to steam turbine producers. In this highly competitive market, advanced technology and interesting technical features are key issues. MAN Turbomaschinen AG GHH BORSIG, Oberhausen and Berlin, have been producers of steam turbines since 1905. Performance optimisation is the main aspect of development today. [German] Die jetzt eingeleitete Liberalisierung des Energiemarktes wird in der Zukunft den verstaerkten Einsatz von neuen umweltfreundlichen und zugleich hoch effizienten Kombikraftwerken notwendig machen. Eine grosse Herausforderung an fuehrende Hersteller modernster Dampfturbinen. Eine ausgereifte Technik sowie technische Alleinstellungsmerkmale sind im heutigen Verdraengungswettbewerb eine Voraussetzung bei Industriedampfturbinen. Seit dem Jahre 1904 baut die MAN Turbomaschinen AG GHH ...
Cellular networks are in a major transition from a carefully planned set of large tower-mounted base-stations (BSs) to an irregular deployment of heterogeneous infrastructure elements that often additionally includes micro, pico, and femtocells, as well as distributed antennas. In this paper, we develop a tractable, flexible, and accurate model for a downlink heterogeneous cellular network (HCN) consisting of K tiers of randomly located BSs, where each tier may differ in terms of average transmit power, supported data rate and BS density. Assuming a mobile user connects to the strongest candidate BS, the resulting Signal-to-Interference-plus-Noise-Ratio (SINR) is greater than 1 when in coverage, Rayleigh fading, we derive an expression for the probability of coverage (equivalently outage) over the entire network under both open and closed access, which assumes a strikingly simple closed-form in the high SINR regime and is accurate down to -4 dB ...
Verification of guarantees mostly calls for measurements on the spot. The paper deals with the guarantees that apply to small hydroelectric powerstations. Already when planning a plant it should be decided what guarantees are to be demanded and how they can be verified. Specifically, measurements to verify guaranteed performance and efficiency on the spot are dealt with. Details are not given. Rather, the report wants to give an overview of methods and aspects to be taken heed of. For in-depth information, the reader is referred to the corresponding standards and guidelines. (orig.) [Deutsch] Zur Ueberpruefung von Garantien ist meistens die Durchfuehrung von Messungen vorort notwendig. Es werden die Garantien behandelt, die bei Kleinwasserkraftanlagen in Frage kommen. Bereits bei der Planung der Anlage sollte entschieden werden, welche Garantien gefordert werden sollen und wie sie ueberprueft werden koennen. Es wird speziell auf die ...
The use of ionic liquids for post combustion capture was discussed. Compared to other solvents, ionic liquids can be used in higher concentrations. Other advantages include the large variation in physical and chemical properties and the non measurable vapor pressure. In this study, 78 different ionic liquids were synthesized and the carbon dioxide absorption rate was measured. The most promising ionic liquids were produced and various tests were made to identify the most suitable absorption solvent. The vapor-liquid equilibrium curve was measured between 40 and 110 degrees C. Pilot plant tests with MEA and one selected ionic liquid test with 30 per cent MEA at the pilot plant at the EVNs Duernrohr PowerStation in Lower Austria are running successfully with a capture performance of approximately 87 per cent. The experiments will provide a direct comparison of the energy demand and capture performance between the MEA and the ionic liquids.
Tarapur Atomic PowerStation 3 and 4 is a 540 MWe Pressurized Heavy Water Reactor. It uses 37 - element natural Uranium dioxide (UO_2) fuel pellets encapsulated inside the cylindrical sheath and are welded to the end plate at each end. During an postulated accident in which part of the fuel bundle are exposed to very high temperature (no means of heat removal) and other are at lower temperature (coolant temperature) possibility of failure of end plate weld due of thermal stresses developed by these relative temperature cannot be ruled out. In this report an attempt is made to study behaviour of fuel bundle under different temperature loading. Modelling of 37 element fuel bundle was done in ANSYS FEM. System was analysed for various sets of temperature loading. The system was analysed for plasticity and creep as material nonlinearity. The total strain, creep strain and stress increase as the temperature increases in upper portion of fuel bundle ...
The thermodynamic properties of aqueous solutions containing ammonia and sour gases such as carbon dioxide, sulfur dioxide, or hydrogen sulfide must be known in many applications. A typical example is the cleaning of raw gases in powerstations. The enthalpy changes upon partial evaporation of aqueous solutions containing ammonia and of aqueous solutions containing ammonia and carbon dioxide were measured at temperatures from 313 to 393 K with a thin film evaporator flow calorimeter. The molalities of ammonia and carbon dioxide entering the calorimeter ranged up to 12 and 6 mol/kg, respectively. The physicochemical model originally developed by Edwards et al. (1978) and further modified and extended by Kurz et al. (1995) to describe phase equilibria in aqueous systems containing ammonia and carbon dioxide is used to derive a predictive enthalpy model for this complex, chemical reactive system. Comparisons between the new experimental results ...
Based on the tried and proven 32/40 diesel engine MAN B and W Diesel AG has developed a dual fuel gas engine covering a rate from 2.4 to 7.2 MW for stationary application in cogeneration and powerstations. This paper reports the salient points of the 32/40 DG development project from the concept phase through to prototype testing. To reach the targets a dual fuel prechamber combustion system was developed using an externally arranged, cylinder individual gas admission for the main combustion chamber and a pilot fuel injection to the prechamber. Due to the high thermal and mechanical load sustaining capability of the strong-built heavy fuel diesel engine, bmep (19.9 bar) and efficiency (42.6%) in excess of the targets were achieved with a more than satisfactory life of components. Moreover, the NO{sub x} limit of 500 mg/m{sup 3} as specified in the German TA Luft was successfully met.
Substation machinery foundation works have some features such as a number of work cases second look cases in design, and so forth. The Tohoku Electric Power Co., Inc. started the development of a system generally supporting the substation machinery foundation design to practical use the Engineering Work Station (EWS) introduced to the civil engineering department as a part of improvement of management efficiency. At first, rigid foundation design support system (TRAD) and slab foundation design support system (KANSAS-IN) automatically conductible with from preparation of design and amount calculation sheet to preparation of design drawing was developed, which was began to operate since March of 1996. As a result, the rigid foundation design became able to execute fully automatic works from preparation of design and its drawing to amount calculation. And, on the slab foundation design, three dimensional FEM analysis could be executed for shorter ...
This report for the Swiss Federal Office of Energy (SFOE) describes the borehole that has been driven into the underlying crystalline rock of the Rhine valley near Basle. This work has been carried out within the framework of the 'Deep Heat Mining' project. The 2,755 metre deep borehole provides geological information essential for the realisation of a proposed geothermal powerstation using the 'Hot Dry Rock' process. The boring of the test borehole is described. The results obtained from samples taken from the test borehole and the measurements made in it are presented, including details on geological formations, temperature, gas measurements and rock strain values. The author is of the opinion that the chances of finding temperatures of at least 200 {sup o}C in a depth of 5 km - as foreseen in the 'Deep Heat Mining' project - can be considered as being quite high.
The authors report how the Midland cogeneration venture (MCV) is repowering the incomplete Midland nuclear plant to operate as a gas-fired combined cycle cogeneration facility. They discuss how their company is responsible for performing engineering, procurement, licensing, construction, start-up, training, and operational assistance for this facility. As shown, twelve gas turbine generator sets supply heat to twelve heat recovery steam generators (HRSGs), which are headered together on the steam side to provide energy to either of two existing steam turbine generators. This combination of equipment enables approximately 1,380 MWe of electrical generation capability, while supplying an average steam flow of 629,000 lbs/hr to an adjacent Dow Chemical Company pant. The MCV facility will also provide 60 MW of electric power to Dow. The authors report how the Midland ccogeneration venture (MCV) is repowering the incomplete Midland nuclear plant to operate as a ...
The report gives a brief introduction into the EU grant programmes since 1984 and explains the philosophy behind them. The current situation regarding grant opportunities for the construction and modernization of small hydroelectric installations is outlined. Hints are given with a view to grant applications. A selection of small hydro powerstations supported by grants (since 1984) are described with their economic and technical features. (orig.) [Deutsch] In diesem Beitrag wird eine kurze Einfuehrung in die EU-Foerderprogramme seit 1984 und Erlaeuterungen zu der Programmphilosophie gegeben. Die derzeitige Situation bezueglich der Foerderung von Kleinwasserkraftanlagen fuer Neubauten und Modernisierungsmassnahmen wird dargestellt. Es werden Hinweise zur Stellung eines Foerderantrags beschrieben. Abschliessend erfolgt die Vorstellung einer Auswahl von gefoerderten Kleinwasserkraftanlagen (seit 1984) mit den wirtschaftlichen und technischen ...
Developments in the past 10 -15 years in the fiels of `steel`, `boilers`, `steam turbines` and `environmental protection` show that the advanced coal dust furnace technology is another option of clean coal technology. The contribution discusses some of the current problems facing the main partners of the coal sector, e.g. coal producers, public utilities and suppliers of steel, boilers and turbines. (orig./GL) [Deutsch] Die Entwicklung der vergangenen 10-15 Jahre in den Bereichen `Stahl`, `Kessel`, `Dampfturbinen` und `umweltschutztechnische Anlagen` verdeutlicht, dass die fortgeschrittene Kohlestaubfeuerungstechnologie ebenfalls eine Option der `Clean Coal Technologies` ist. Im Rahmen dieses kurzen Aufsatzes wird nun versucht, einige zeitgemaesse Problemkreise der Hauptakteure des Strommarktes, wie z.B. des Kohlefoerderers, der Stromproduzenten und der Stahl-, Kessel- sowie Turbinenhersteller anzudeuten. (orig./GL)
On February 1, 1984, the US Nuclear Regulatory Commission issued Generic Letter 84-04 on the subject of postulated pipe breaks in pressurized water reactor (PWR) primary coolant loops, opening the way for pipe-whip restraint exemptions. The letter substitutes the leak-before-break (LBB) criteria for the double-ended guillotine break regarding PWR primary reactor coolant system (RCS) piping and asymmetric blowdown loads. The LBB criterion refers to the fact that a piping flaw will leak before it breaks. The current requirement to provide pipe-whip restraints is applied within the plant to all high-energy piping with a potential for damaging structures, systems, and components essential to safe reactor shutdown. This includes primary RCS piping 30 in. and larger as well as smaller piping systems. A study was performed to evaluate the applicability of the LBB criteria proposed in NUREG-1061 to the latter set. The costs and benefits of this kind of application were assessed through a ...
Through the analysis of the relations between "3H monitoring results of sea water in West Daya Bay carried out by Guangdong Environmental Radiation Research and Monitoring Center (GERC) from 1994 to 2000 and the quantity of liquid "3H discharges made by Guangdong Nuclear PowerStation (GNPS), the function has been found by fitting to describe the relation between "3H average concentrations (hereafter as to average concentration or concentration) for all sampling points at the same time and the quantity of liquid "3H discharges. "3H instantaneous concentrations or yearly average concentration in West Daya Bay can be estimated conveniently by using this function corresponding to either actual discharges or supposed discharges (the way for hydrodynamic calculation) from the GNPS's yearly "3H liquid discharge. The results have shown that the general influences both actual discharges and supposed sub-continuous discharges are almost the same and ...
The AFGD process as demonstrated by Pure Air at the Bailly Station offers a reliable and cost-effective means of achieving a high degree of SO{sub 2} emissions reduction when burning high-sulfur coals. Many innovative features have been successfully incorporated in this process, and it is ready for widespread commercial use. The system uses a single-loop cocurrent scrubbing process with in-situ oxidation to produce wallboard-grade gypsum instead of wet sludge. A novel wastewater evaporation system minimizes effluents. The advanced scrubbing process uses a common absorber to serve multiple boilers, thereby saving on capital through economies of scale. Major results of the project are: (1) SO{sub 2} removal of over 94 percent was achieved over the three-year demonstration period, with a system availability exceeding 99.5 percent; (2) a large, single absorber handled the combined flue gas of boilers generating 528 MWe of power, and no spares were ...
In the Joule II project JOU2-CT 94-0428 `Development and Testing of Stand-Alone small-size Solar Photovoltaic-Hydrogen power Systems (SAPHYS)`, different design configurations are compared and discussed. In this paper we present some of the proposed design configurations and discuss their benefits and drawbacks. Simplified expressions for system efficiency for the different configurations are presented. These expressions are based on average efficiencies for the solar cells, the electrolyzer, the batteries, the hydrogen storage and the fuel cells. Mean fractions of energy passing through the energy storages are also assumed. From considerations in the paper one conclusion becomes apparent, i.e. the direct use of the energy should be maximized. Another conclusion is that one of the most important factors in Solar Photovoltaic Hydrogen Power Systems is the solar cell efficiency. This point seems to be lost in typical projects ...
Developed under the PN II Project 71-009 - MONA, the pre-operational monitoring program of the LIL waste disposal site presented in this paper covers the main elements requested for a continuous improvement of site characterization and safety assessment, as well as for the set up of the baseline data requested for the future operational and post-operational monitoring and surveillance. These elements are: vadose and saturated zones hydrogeology, surface erosion, meteorology and radionuclides content in waters, soil and biota. Pairs of TDR (Time Domain Reflectometry) and pressure sensors, coupled with a meteorological station have been installed on site for the continuously measurement of the water content and matric potential changes due to the climate variations. The data will be used to follow the water balance, the pores water velocity and to calculate the infiltration rate. A new set of erosion rates experimentally determined by Pinhole ...
This document is a Final Technical Report that describes the results of the Geophex Airborne Unmanned Survey System (GAUSS) research project. The objectives were to construct a geophysical data acquisition system that uses a remotely operated unmanned aerial vehicle (UAV) and to evaluate its effectiveness for characterization of hazardous environmental sites. The GAUSS is a data acquisition system that mitigates the potential risk to personnel during geophysical characterization of hazardous or radioactive sites. The fundamental basis of the GAUSS is as follows: (1) an unmanned survey vehicle carries geophysical sensors into a hazardous location, (2) the pilot remains outside the hazardous site and operates the vehicle using radio control, (3) geophysical measurements and their spatial locations are processed by an automated data-acquisition system which displays data on an off-site monitor in real-time, and (4) the pilot uses the display to direct the survey vehicle for complete site ...
In the design of natural gas compressor stations, a check valve is a critical element which is commonly placed on the discharge side of the compressor to prevent reverse flow that can cause serious damage to the compressor itself and other components such as seals and bearings. One of the selection criteria of the check valve for this particular application is the valve flow characteristics in steady flow, and its dynamic characteristics in unsteady flow operation. With regards to steady flow valve characteristics, current models for the determination of the check valve open angle vs. mean flow velocity are based on semi-empirical data obtained from water tests, which were found to deviate from measurements in compressible flows. This paper presents results of steady compressible flow testing of an NPS 4 swing type check valve in air. Mean flow velocities vs. disc angles were measured together with several local pressure measurements at the back side of the valve ...
Maintenance of powerstations so far operated on the concept of using or extending the expected service life of a machine or plant as far as possible in order to avoid early and costly replacement. This was done by means of time-oriented maintenance, inspection and repair, otherwise called preventive maintenance. A European study on maintenance methods totals the cost of these measures at between 140 to 200 billion DM. One way of reducing these costs is 'predictive maintenance'. Estimated savings are about 8 percent or between 12 and 16 billion DM per year. Predictive maintenance identifies irregulaties of machine parts at an early point in time by means of condition monitoring and can help to cut costs: unplanned repairs can be avoided; repairs can be fitted into production schedules; production will not be disturbed to to unforeseen repairs, optimised spare part warehousing helps to cut costs. Predictive maintenance aims at ...
The paper discusses the methodology used at Electricidade de Portugal (EDP) in planning its electric power system. In particular, it considers a description of the methodology used by EDP for a more accurate definition of the input data required to characterize hydroelectric plants and the evaluation of their impact on an optimal long-term expansion plan. In addition, the paper describes an analysis of the results of studies, both with WASP-II and WASP-III, with and without pumped storage plants, respectively. Finally, the paper details the use of VALOR AGUA, in conjunction with WASP, for a better simulation of the hydroelectric system and which also permits to solve other problems closely connected such as the calculation of marginal production costs. (author).
This report is part of a four-volume study of Darrieus vertical axis wind turbine (VAWT) economics. This volume describes a computer model of VAWT cost and performance factors useful for system design and optimization. The content and limitations of the model are outlined. Output data are presented to demonstrate selection of optima and to indicate sensitivity of energy cost to design parameter variations. Optimized specifications generated by this model for six point designs are summarized. These designs subsequently receive a detailed economic analysis discussed in Volume IV. An appendix is included with a FORTRAN IV listing of the model and a description of the input/output characteristics.
Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the feasibility and capabilities of the proposed ...
Analysts working at the International Data Centre in support of treaty monitoring through the Comprehensive Nuclear-Test-Ban Treaty Organization spend a significant amount of time reviewing hypothesized seismic events produced by an automatic processing system. When reviewing these events to determine their legitimacy, analysts take a variety of approaches that rely heavily on training and past experience. One method used by analysts to gauge the validity of an event involves examining the set of stations involved in the detection of an event. In particular, leveraging past experience, an analyst can say that an event located in a certain part of the world is expected to be detected by Stations A, B, and C. Implicit in this statement is that such an event would usually not be detected by Stations X, Y, or Z. For some well understood parts of the world, the absence of one or more 'expected' ...
Several of the issues of the workshop are addressed from the perspective of a potential Space Station developer and energy wheel user. Systems considerations are emphasized rather than component technology. The potential of energy storage wheel (ESW) concept is discussed. The current status of the technology base is described. Justification for advanced technology development is also discussed. The study concludes that energy storage in wheels is an attractive concept for immediate technology development and future Space Station application.
Coal is the most abundant available fossil fuel in Australia and provides a substantial part of energy needs. It is used for power generation, to supply energy to industry as well as for domestic requirements. Analysis of trace elements (the elements present in coal in ppm/ppb level) during combustion of coal in very important. Trace elements, like heavy metals such as arsenic, selenium, and chromium etc. are hazardous to the environment and some of them have carcinogenic potency. In the near future more stringent limits may be proposed for such elements generated from combustion process, such as coal combustion in power plants. Hence analysis and assessment of the emissions of these elements is essential at this stage. The first step towards reducing any impacts of trace elements is to have accurate quantitative analysis. Analysis of coal, bottom ash and fly ash collected from five different power ...
The first Advanced Boiling Water Reactor (ABWR) started commercial operation as Tokyo Electric Power Company's (TEPCO) Kashiwazaki-Kariwa Nuclear PowerStation Unit No.6 (K-6) in November 1996 and its sister Unit No.7 (K-7) in July 1997. The ABWR was developed to achieve higher reliability and safety margin while improving overall operability and economics. To achieve these goals, the optimal Boiling Water Reactor (BWR) technologies had been studied, tested and were finally adopted into the ABWR design. These technologies were called 'First of a Kind' and include the Reactor Internal Pump (RIP), Fine Motion Control Rod Drive (FMCRD), Reinforced Concrete Containment Vessel (RCCV), and integrated digital Instrumentation and Control System (I and C). Intensive development study, confirmation tests and verification tests were conducted by the plant equipment suppliers, electric utilities, and government agencies. During plant ...
Water power plants mean the design, configuration, execution and operation of buildings and of hydraulic and electrical machines. Their many types are due to the stages of development and the technical alternatives of the use of waterpower and the associated energy economy aspects. The main points of this work are the use of water power, different hydro-electric powerstations, water collection, machines and electrotechnical equipment. In the 2nd revised edition parts on electrical engineering, environment, minimum water run-off pumped storage plants, small scole plants, economical aspects and finite elements were broadened. It is a comprehensive textbook and technical book for students of civil engineering and particularly suitable for engineers active in the theory and practice of waterpower construction. (orig./GL) [Deutsch] Wasserkraftanlagen bedeuten Planung, Gestaltung, Ausfuehrung und Betrieb von Bauwerken und hydraulischen sowie ...
Water power plants mean the design, configuration, execution and operation of buildings and of hydraulic and electrical machines. Their many types are due to the stages of development and the technical alternatives of the use of waterpower and the associated energy economy aspects. The main points of this work are the use of water power, different hydro-electric powerstations, water collection, machines and electrotechnical equipment. In the 2nd revised edition parts on electrical engineering, environment, minimum water run-off pumped storage plants, small scole plants, economical aspects and finite elements were broadened. It is a comprehensive textbook and technical book for students of civil engineering and particularly suitable for engineers active in the theory and practice of waterpower construction. (orig./GL) [German] Dieses Standardwerk der Wasserkraft liegt hiermit bereits in 4. Auflage vor. Es wurde noch staerker an die Erfordernisse ...
Japan's first water powerstation to provide public power was the Keage plant (maximum output 160 kW) which began operation in 1891. The installed capacity of pure hydro plants reached 20 481 MW in March 1991; pumped-storage powerplants account for 17 004 MW, making a total of 37 483 MW. Pumped-storage thus represents 45 per cent of total hydro capacity. Pure hydro plants under construction at the end of March 1990 totalled 75, representing 968 MW of capacity. There were also seven pumped-storage plants under construction (each more than 300 MW). The latest survey to establish the hydro potential of Japan indicated the gross theoretical hydro potential to be 717 600 GWh/year and the exploitable potential to be 130 524 GWh/year. Of this exploitable potential, 60 per cent is in operation and 3 per cent is under construction. The exploitable potential represents 4551 pure hydro plants, with a total installed capacity ...
New tetradentate N(2)O(2) donor Schiff bases and their mononuclear Co(II), Ni(II), Cu(II), and Pd(II) complexes were synthesized and characterized extensively by IR, (1)H-, (13)C-NMR, mass, ESR, conductivity measurements, elemental and thermal analysis. Specifically the magnetic and electronic spectral measurements demonstrate the octahedral structures of cobalt(II), nickel(II) complexes and square planar geometries of copper(II), palladium(II) complexes. All the ligands and complexes were screened for their in vitro antibacterial activity against two gram-positive bacteria (Bacillus subtilis, Staphylococcus aureus) and two gram-negative bacteria (Escherichia coli, Klebsiella pneumonia). In this study, Pd(II) complexes exhibited potent antibacterial activity against B. subtilis, S. aureus whereas ...
Some acylhydrazine derived ONO donor Schiff bases and their Co(II) and Ni(II) complexes have been prepared having the same metal ion (cation) but different anions. These synthesized metal(II)...Full Text Available
Water-resources data for the 1993 water year for Minnesota consists of records of stage, discharge and water quality of streams; stage, contents, and water quality of lakes and reservoirs; and water levels and water quality in wells and springs. This volume contains discharge records for 58 gaging stations; stage and contents for 9 lakes and reservoirs; water quality 15 stream stations, 1 lakes station, 1 precipitation station, and water levels for 15 observation wells. Also included are 61 high-flow partial-record stations. Additional water data were collected at various sites, not part of the systematic data collection program and are pulished as miscellaneous measurements.
Water-resources data for the 1991 water year for Minnesota consist of records of stage, discharge and water quality of streams; stage, contents, and water quality of lakes and reservoirs; and water levels and water quality in wells and springs. The volume contains discharge records for 60 gaging stations; stage and contents for 9 lakes and reservoirs; water quality for 18 stream stations, 1 lake station, 22 partial-record sites, 1 precipitation station, 108 wells; and water levels for 119 observation wells. Also included are 59 high-flow partial-record stations. Additional water data were collected at various sites, not part of the systematic data collection program and are published as miscellaneous measurements or low-flow investigations.
A full analysis is shown in this paper for the cost of kWh generated from photovoltaic station located in Kuwait. By using a 21 years weather data for Kuwait, the yearly generated energy was found by proposing the PV station capacity with known panels tilt angle. The cost of kWh generated from PV station was compared with the kWh generated from conventional units in the country. A sensitivity analysis was done to some factors, capital cost per installed PV peak watt, discount rate, and operating peak hours, which affect the cost of kWh production from both PV and conventional units. If the PV station is proposed to be installed in Kuwait, the capital cost per PV installed peak watt must be less than today`s prices. (author)
Data from a detailed evaluation of environment conditions in three U.S. Army field stations are presented. Three field stations were evaluated: Kunia, Augsburg, and Berlin. Results from a questionnaire administered to over 600 people at all sites in three job types (operator, analyst, and administrative/other) are given which indicate major concerns with conditions such as temperature, lighting, space, furniture, equipment functioning, and general environmental quality. Physical data obtained from measurements of over 270 work stations indicated the presence of cold temperatures, low light levels, reduced VDT screen contrast, glare, and distracting noises. The report provides the basic data that support the concerns expressed by Headquarters; namely, that field-station personnel perform their jobs under conditions likely to impair their effectiveness. Suggestions for improving conditions are given in a ...
Two dimensional Fourier spectra of near-infrared images of galaxies provide a powerful diagnostic tool for the detection of spiral arm modulation in stellar disks. Spiral arm modulation may be understood in terms of interference patterns of outgoing and incoming density wave packets or modes. The brightness along a spiral arm will be increased where two wave crests meet and constructively interfere, but will be decreased where a wave crest and a wave trough destructively interfere. Spiral arm modulation has hitherto only been detected in grand design spirals (such as Messier 81). Spiral arm amplitude variations have the potential to become a powerful constraint for the study of galactic dynamics. We illustrate our method in two galaxies: NGC 4062 and NGC 5248. In both cases, we have detected trailing and leading m=2 waves with similar pitch angles. This suggests that the amplification mechanism is the WASER type II. In this ...
{sup 14}C is a is a long-lived beta-emitting nuclide (T{sub 1/2} = 5730 years) produced naturally in the upper atmosphere as a result of reactions between neutrons and stable {sup 14}N({sup 14}N(n,p){sup 14}C). Although in a lesser extent, nuclear power plants produce {sup 14}C as well during their routine operation. Since it is converted in {sup 14}CO{sub 2} and mixed throughout the atmosphere, it is incorporated into plant tissues, via photosynthesis process, and hence in food chain. Because of the biological importance of {sup 14}C and long half-life, it is of interest to quantify the amounts released by nuclear industry. The Brazilian nuclear central named Nuclear Central Admiral Alvaro Alberto (CNAAA) has two nuclear reactors of PWR type in operation, Angra I (657 MWe) and Angra II (1350 MWe), and one under construction, Angra III (1309 MWe PWR). The aim of this study was to determine the strength of the sources and the {sup 14}C content ...
Two different techniques were used for measuring Rn-gas concentrations and Working Level (WL) in U-exploration galleries at El-Allouga Mine, Sinai, Egypt. The active techniques used EDA(RDA-200) with calibrated Lucas cell and Tri-Met-372 instruments and passive techniques used four different types of SSNTD. Twenty eight (28) stations inside the studied tunnels were located covering the different environmental conditions. The measurements were carried out during summer time, in the ventilated sector (16 stations), the average tunnel air temperature was 24.4 #+-# 2.2 degree C and relative humidity 38%. In the non-ventilated sector (12 stations), the average tunnel air temperature was 22.2#+-#0.4 degree C and relative humidity 70%. The Rn-gas concentrations using EDA(RDA-200) and calibrated Lucas cell, in the ventilated sector averaged 11.966 p Ci/l, while in the non-ventilated stations averaged 786.21 p ...
A structurally conserved element, the trigger loop, has been suggested to play a key role in substrate selection and catalysis of RNA polymerase II (pol II) transcription elongation. Recently resolved...Full Text Available
The insulin/IGF-1 signaling (IIS) pathway is a conserved regulator of longevity, development, and metabolism. In Caenorhabditis elegans IIS involves activation of DAF-2 (insulin/IGF-1...Full Text Available
DNA from the peripheral blood mononuclear cells of 17 different individuals infected with human T-cell lymphoma/leukemia virus type II (HTLV-II) was successfully amplified by the polymerase chain reaction...Full Text Available
This report covers the first year of operation of a fuel cell power plant, installed by PPL Spectrum, Inc. (PPL) under contract with the United States Coast Guard (USCG), Research and Development Center (RDC). The fuel cell was installed at Air Station Cape Cod in Bourne, MA. The project had the support of the Massachusetts Technology Collaborative (MTC), the Department of Energy (DOE), and Keyspan Energy. PPL selected FuelCell Energy, Inc. (FCE) and its fuel cell model DFC{reg_sign}300 for the contract. Grant contributions were finalized and a contract between PPL and the USCG for the manufacture, installation, and first year's maintenance of the fuel cell was executed on September 24, 2001. As the prime contractor, PPL was responsible for all facets of the project. All the work was completed by PPL through various subcontracts, including the primary subcontract with FCE for the manufacture, delivery, and installation of the fuel ...
The results of this research centered on the experimental studies of a single superconducting persistent current qubit, the implementation of type-II algorithms using these qubits, and the proposal for adiabatic quantum computing using these qubits. The m...
The in vivo photochemical activity of photosystem II was inferred from modulated chlorophyll fluorescence and photoacoustic measurements in intact leaves of several plant species (Lycopersicon...Full Text Available
Woolfolk, C. A. (University of Washington, Seattle). Reduction of inorganic compounds with molecular hydrogen by Micrococcus lactilyticus. II. Stoichiometry with inorganic...Full Text Available
... and high-quality photospheric-phase Type II SN spectra to constrain core- collapse SN explosions, massive star evolution, and distances in the Universe ...
This document describes payload control at LLNL to ensure that all shipments of CH-TRU waste in the TRUPACT-II (Transuranic Package Transporter-II) meet the requirements of the TRUPACT-II SARP (safety report for packaging). This document also provides specific instructions for the selection of authorized payloads once individual payload containers are qualified for transport. The physical assembly of the qualified payload and operating procedures for the use of the TRUPACT-II, including loading and unloading operations, are described in HWM Procedure No. 204, based on the information in the TRUPACT-II SARP. The LLNL TRAMPAC, along with the TRUPACT-II operating procedures contained in HWM Procedure No. 204, meet the documentation needs for the use of the TRUPACT-II at LLNL. Table 14-1 provides a summary of the LLNL waste generation and ...
Biosorption using activated sludge biomass (ASB) as a potentially sustainable technology for the treatment of wastewater containing different metal ions (Cd(II), Pb(II) and Zn(II)) was investigated. ASB metal uptake clearly competed with protons consumed by microbial biomass compared with control tests with non-activated sludge biomass. Biosorption tests confirmed maximum exchange between metal ions and protons at pH 2.0-4.5. It was revealed by the study that the amount of metal ions released from the biomass increased with biomass sludge concentration. The result showed that maximum absorption of metal ions was observed for Cd(II) at pH 3.5, Pb(II) at pH 4.0, and pH 4.5 for Zn(II) ions. The maximum absorption capacities of ASB for Cd(II), Pb(II) and Zn(II) were determined to be 59.3, 68.5 and 86.5%, ...
In this article the methodology followed to diagnose the performance of the equipment where heat is transferred from the feed water, condensate and circulation water systems in fossil power plants (FPP). The data collection is made with the unit in normal operation, using local instrumentation without taking the equipment out of service for its installation. The equipment diagnosis is made through the analysis of the collected data in actual operation and the design data; for this purpose a thermal balance of the interested systems is performed to obtain all the conditions an operation data. Later on the performance indicative parameters (PIP) of actual operation and design are calculated and compared one against the other. Such a comparison reveals the performance deterioration and the possible equipment faults. The data obtained and the supplementary information are stored in a data base whose objective is that Comision Federal de Electricidad has on hand a ...
The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design and proof-of-design, and Phase ...
Following a referendum in Italy in 1987, the four Nuclear Power Plants (NPPs) owned and operated by the state utility ENEL were closed. After closing the NPPs, ENEL selected a ''safestore'' decommissioning strategy; anticipating a safestore period of some 40-50 years. This approach was consistent with the funds collected during plant operation, and was reinforced by the lack of both a waste repository and a set of national free release limits for contaminated materials in Italy. During 1999, twin decisions were made to privatize ENEL and to transform the nuclear division into a separate subsidiary of the ENEL group. This group was renamed Sogin and during the following year, ownership of the company was transferred to the Italian Treasury. On formation, Sogin was asked by the Italian government to review the national decommissioning strategy. The objective of the review was to move from a safestore strategy to a prompt ...
Aging degradation is a phenomenon we all experience throughout life, both on a personal basis and in business. Many industries have been successful in postponing the inevitable impact on their related systems and components through programs to maintain long-term reliability, maintainability and safety. However, this has not always been the case for nuclear power. While all power plants are experiencing the world trend of increasing operating costs with age, few (if any) have been able to fully define the parameters that solve the aging equation, particularly in relation to major components. Inspection and preventive maintenance have not been effective in predicting life-limiting degradation and failure. In CANDU nuclear plants, utilities are taking a comprehensive approach in dealing with the aging problem. Programs have been established to identify the current condition and degradation mechanisms of critical components, the failure of which ...
Radiowave scintillation in the presence of natural and/or high-altitude nuclear disturbances has the potential to disrupt numerous transionospheric radio and radar systems. This report develops a model characterizing the plasma-density irregularities that produce scintillation in the naturally disturbed equatorial F layer. The model is incorporated into Program WBMOD along with subroutines for computing both link geometry and scintillation indices, the latter by means of phase screen diffraction theory. The model is based on similarly extensive analysis of wideband data from two equatorial stations. It describes irregularities at an effective height of 350 km that are isotropic across the geomagnetic field and elongated by a factor of 50 along the field and whose one-dimensional spatial power spectrum obeys a single-regime power law with a (negative) spectral index of 1.5. The height-integrated spectral strength of the ...
The steam generator (SG) is one of the most critical components of the heat transfer system in nuclear generation stations. Testing the structural integrity of SG tubing and SG internals is a key element of the fitness-for-service assessments to assure the safe and continuous operation of nuclear power plants. Recent eddy current (ET) inspections of two nuclear power plants revealed degradation of some of the tube support plate (TSP) structures, which was also confirmed by visual inspection. The phenomena was described as metal loss, caused by flow-accelerated corrosion of the carbon steel trefoil support plate and varying from minor to complete loss of the ligaments. This loss of TSP ligaments results in lack of support for the adjacent tubes making them more susceptible to fretting-wear damage and fatigue cracking. A signal analysis method, based on the responses at low frequency of two types of eddy current probes, has ...
MAN B&W in Augsburg, Germany has further developed its dual-fuel line of engines with the 32/40 DG engine family. These engines, with prechamber injection, augment the company`s spark-ignited gas and dual-fuel engines based on its four-stroke diesel engines. MAN B&W`s power range is between 400 and 16200 kW. Based on the well-proven 32/ 40 engine, the 32/40 DG dual-fuel engine was developed mainly for stationary applications in cogeneration plants and powerstations, covering an output range from 2.4 to 7.2 MW. The engine line (bore 320 x stroke 400 mm) has a cylinder output of 400 kW at 750 r/min and a bmep of 19.9 bar with a maximum efficiency of 44.4%. The development focused on meeting TA Luft limits for NO{sub x} emissions of less than 500 mg/m{sup 3} NO{sub x}. This level was targeted without catalytic exhaust after treatment (SCR) and retaining high efficiency and high mean effective pressure similar to that ...
The Steam Generator (SG) serves as an interface between primary and secondary cycle in Pressurized Heavy Water Reactor (PHWR). Failure of steam generator tubes result in leaking of active heavy water in the secondary closed loop. In Tarapur Atomic PowerStation-3 and 4 (TAPS- 3 and 4), Scintillator detectors are provided to detect on line heavy water leakages in SG and moderator heat exchangers by monitoring Nitrogen-16 ("1"6N) and Oxygen-19 ("1"90) activities. Efficacy of detection of these activities at designed detector position on SG blow down line in presence of background radiation field is analysed theoretically. The count rate of "1"9O and "1"6N estimated at the detector position inside Reactor Building (RB) shows that detectors only respond to very high leak rates due to presence of high background even though sensitivity is appreciably good. For detector position out side the RB containment, the travel time for the feed water becomes ...
From June to September 2004 a water research was carried out in six stations that are located at the following microbasins: La Laucha (S1), La Lejia (S2, S3 and S6) and La Rastrojera (S4 and S5). Those microbasins are localized at the Durania municipality in Norte de Santander Department. This study was carried out in order to evaluate water quality at the microbasins above mentioned using macroinvertebrates as bioindicators. For physical, chemical and microbiological parameters a sample was taken at each station. The results were correlated with biologic parameters and it may be concluded that the station 5 closer to the town of Durania is the most polluted by organic matter and that those stations that belong to the ritral zone are less contaminated. The final result showed that the stations 1. 2. 3. 4 and 6 have conditions that can be classified as very clear to clear water and ...
Volume 2 of the water resources data for the 1992 water year for Oklahoma consists of record of stage, discharge, and water quality of streams; stage, contents, and water quality of lakes or reservoirs; and water levels of ground-water well. The report contains discharge records for 136 gaging stations; stage and contents for 31 lakes or reservoirs; water quality for 50 gaging stations. Also included are 61 partial-record or miscellaneous streamflow stations and 28 ground-water sites.
The elemental analysis of some plant samples have been carried out in Trabzon region (Turkey) using energy-dispersive X-ray fluorescence (EDXRF) spectrometry. We have analyzed plant samples for nine stations using 1.85 GBq 55Fe radioactive sources. We have found that potassium and calcium within 0.3-1.4% and 0.3-2.8% were present in concentration in plants for every station, respectively. The concentration of Cl and Ti generally changed according to the plant species and the sampling station.
The COsmic ray Research and Education Array (COREA) collaboration has installed an array of six detector stations at two high schools in and near Seoul, Korea for measurement of air-shower events from high-energy cosmic rays. Three stations are installed at each site, where each station consists of four plastic scintillation detectors covering an area of 2m2. In this presentation, we report the currenst status of the COREA project, describing the experimental equipment and measurement of coincident events.
1. Contest rules The European Space Agency (ESA) is launching a public competition to find the most suitable names for its four Cluster II space weather satellites. The quartet, which are currently known as flight models 5, 6, 7 and 8, are scheduled for launch from Baikonur Space Centre in Kazakhstan in June and July 2000. Professor Roger Bonnet, ESA Director of Science Programme, announced the competition for the first time to the European Delegations on the occasion of the Science Programme Committee (SPC) meeting held in Paris on 21-22 February 2000. The competition is open to people of all the ESA member states (*). Each entry should include a set of FOUR names (places, people, or things from history, mythology, or fiction, but NOT living persons). Contestants should also describe in a few sentences why their chosen names would be appropriate for the four Cluster II satellites. The winners will be those which are considered most suitable ...
Barsebaeck 1 was closed on 30 November 1999. Barsebaeck's output of approximately 4 TWh per year will primarily be replaced by imports from coal-fired plants in Denmark and Germany. During the year, the closure of Swedish fossil-fired condensing powerstations continued. With that, over 3,000 MW of peak-load power has been shut down during recent years. Consequently, situations entailing shortages of power can arise. On the deregulated electricity market, it is only the system operators that have a satisfactory overview of the overall electricity balance. The Swedish Power Association has thus lobbied the government as regards the need to elucidate Svenska Kraftnaet's responsibility. In a governmental decision from December, Svenska Kraftnaet was given the task of, among other things, monitoring the available capacity during peak loads and developing market ...
Apart from the vulnerability implied by the START II treaty, it will bear the burden of the general political opposition to the Yeltsin administration. START II will be seen as part of an overall Yeltsin-Andrei Kozyrev foreign policy that is under fire for selling out Russian national interests in Yugoslavia, the Persian Gulf, and elsewhere. This article discusses public opinion concerning START II, the cost of its implementation, and the general purpose of the treaty.
The upgraded CDF II detector has collected first data during the initial operation of the Tevatron accelerator in Run II. The simulation of the CDF electromagnetic and hadronic central and upgraded plug (forward) calorimeter is based on the Gflash calorimeter parameterization package used within the GEANT based detector simulation of the Run II CDF detector. We present the results of tuning the central and plug calorimeter response to test beam data.
PRESTO-II is a computer code developed to evaluate possible health effects from shallow land disposal of low level radioactive wastes. PRESTO-PREP is a data preprocessor that has been developed to expedite the formation of input data sets for PRESTO-II. PRESTO-PREP utilizes a library of nuclide and risk-specific data. Given an initial waste inventory, the code creates the radionuclide portion of the associated input data set for PRESTO-II. 2 references.
The purpose of this paper is to describe the embedded computer systems approach taken at Experimental Breeder Reactor II (EBR-II) for non-safety related systems. The hardware and software structures for typical embedded systems are presented The embedded systems development process is described. Three examples are given which illustrate typical embedded computer applications in EBR-II.
Angiotensin II (Ang II) is a key proapoptotic factor in fibrotic tissue diseases. However, the mechanism of Ang-II-induced cell death in endothelial cells has not been previously elucidated....Full Text Available
... of waste food generated at McMurdo Station. Some of the difficulties of disposing of waste food ... change waste generation or management at the site? Yes. This will be a temporary waste management ...
The advantages of using heads of around 1000 m in conjunction with underground location of the lower reservoirs for pumped storage plants are described, and the possible layouts, equipment, and construction methods are discussed.
screens of fine wire was placed between the gun barrel and the panel to determine whether the gun performance was repeatable. The transducers were placed ...
... Air Station, Oahu, Kahuku Training Area ... K-Pier, Hawaii, Bradshaw Army Airfield, Hawaii (R&S ... impact area); Makua Military Reservation, Oahu (R&S ...
Jul 7, 2008 ... HOUSTON -- Following a detailed, integrated assessment, NASA selected ... in the center that provides a 360-degree view around the station. ...
Nov 21, 2003... for the European Space Agency's Automated Transport Vehicle, a new, uncrewed station cargo vehicle targeted for launch late next year. ...
on this technology has beenproposedas a payload on SpaceStation Freedom to be launched in the near future [1]. Direct detection 4-ary pulse position modula- ...
2011 Department of Energy Investments in Carbon Capture Technologies 2010 Smart Meter Installations DOE Recovery Field Projects and State Memos Advanced Vehicle...
The report presents details of the distributions of air pollution in the Berlin area and the developments of the past 20 years. Highly polluted areas are indicated in which air pollution reduction measures are particularly urgent. The report therefore intends not only to inform but also to point out the deficiencies of air pollution abatement measures, so that political consequences can be derived and measures can be taken. In all, data were recorded by 39 measuring stations in West Berlin, 16 in East Berlin, and 7 in Potsdam and Frankfurt/Oder. In most stations, sulphur dioxide and airborne dust were measured; 14 stations in West Berlin and one in East Berlin measured carbon monoxide and nitric oxides; 8 stations in West Berlin recorded ozone concentrations. (orig./KW).
The first analysis of inelastic J/{psi} meson production in photoproduction (Q{sup 2}<2.5 GeV{sup 2}) of the H1 experiment for the second phase of HERA (HERA II) is presented. The analysis is carried out at low and medium elasticities. The production of heavy quarks (charm, or bottom) is of special interest since the mass of the quarks provides a hard scale for the application of perturbative QCD. The muonic decay channel is used to select the J/{psi} mesons. The data was collected by the H1 detector during the period 2003-2005, and corresponds to an integrated luminosity of 133 pb{sup -1}. However only a subset of this data could be analysed. At the start of HERA II the trigger system was affected by a sizeable background. Then a fault was introduced in the trigger software during the summer 2004 and was only discovered and solved in April 2006. This means that approximately 80 % of the triggered events at medium elasticities and 65 % ...
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The ...
This is a slide-based oral presentation given to the COG/IAEA: Fifth technical committee meeting on 'Exchange of operating experience of pressurized heavy water reactors' held in Mangalia, Romania on 7-10 September 1998. Since energization of Wolsung Unit 3 station service transformer on July 12, 1996 a line of initial test program was conducted as follows: 1. ILRT/SIT; 2. Pre-operational and Hot Functional testing with a Light Water and without Fuel in Systems; 3. Load D_2O in Moderator System; 4. Initial fuel loading; 5. Load D_2O in PHT System; 6. Hot Functional Testing with Heavy Water and Fuel in Systems; 7. Criticality and Low Power Physics Testing; 8. Power Ascension Test and, then finally, phase-D test; the plant acceptance test was accomplished after having a Mini-Overhaul to prepare for Commercial Operation. These documents contain not only both overall introduction of commissioning and the first TBN rolling and ...
The operation and safety of both fossil-fuel and nuclear powerstations depend on adequate cooling of the thermal source involved. This is usually accomplished using liquid coolants that are forced through the high temperature regions by a pumping system; this fluid then transports the thermal energy to another section of the powerstation. However, fluids that undergo boiling during this process create vapor that can be detrimental, and influence safe operation of other system components. The behavior of this vapor, or void, as it is generated and transported through the system is critical in predicting the operational and safety performance. This study uses two advanced penetrating radiation techniques, Real Time Neutron Radiography (RTNR), and High Speed X-Ray Tomography (HS-XCT), to examine void generation and transport behavior in a flow boiling system. The geometries studied were tube side flow ...
Carbalkoxylation of vinyl electrophiles was investigated using platinum complexes. This reaction occurs in two steps: (a) carbonyl insertion of {sigma}-vinyl Pt(II) halides and (b) alcoholysis of vinylic acyl Pt(II) complexes. Alcoholysis of vinylic acyl Pt(II) triflate complexes is investigated kinetically. Vinylic acyl Pt(II) complexes were isolated and characterized. 51 refs., 5 figs., 6 tabs.
The MTX explored the plasma heating effects of 140 GHz microwaves from both Gyrotrons and from the IMP FEL wiggler. The Gyrotron was long pulse length (0.5 seconds maximum) and the FEL produced short-pulse length, high-peak power, single and burst modes of 140 GHZ microwaves. Full-power operations of the IMP FEL wiggler were commenced in April of 1992 and continued into October of 1992. The Experimental Test Accelerator H (ETA-II) provided a 50-nanosecond, 6-MeV, 2--3 kAmp electron beam that was introduced co-linear into the IMP FEL with a 140 GHz Gyrotron master oscillator (MO). The FEL was able to amplify the MO signal from approximately 7 kW to peaks consistently in the range of 1--2 GW. This microwave pulse was transmitted into the MTX and allowed the exploration of the linear and non-linear effects of short pulse, intense power in the MTX plasma. Single pulses were used to explore and gain ...
The aim of this case study is to analyse the socio-economic effects of forest fuel supply and use chains. Two of the four cases are rural district heating plants. In Perho, the co-operative organisation of forest owners maintains the fuel supply and operates the plant. In Ruukki, the local forestry association supplies forest chips to the plant. These medium-scale plants use small-sized trees from young thinning stands as their main fuel. The trees are felled manually. The other two cases are large power plants. Alholmens Kraft's new power plant in Pietarsaari aim to use 250 000 solid-m3 of forest chips annually. The logging residues are hauled to the plant as bales using traditional timber harvesting equipment or as bulk material. At young thinning stands the trees are harvested using an accumulating feller buncher. The Toppila I and IIpower plants in the city of Oulu used about 36 000 ...
Lunar resource utilization has focused principally on the extraction of oxygen from the lunar regolith. A number of schemes have been proposed for oxygen extraction from Ilmenite and Anorthite. Serendipitously, these schemes have as their by-products (or more directly as their "waste products"), materials needed for the fabrication of thin film silicon solar cells. Thus lunar surface possesses both the elemental components needed for the fabrication of silicon solar cells and a vacuum environment that allows for vacuum deposition of thin film solar cells directly on the surface of the Moon without the need for vacuum chambers. In support of the US space exploration initiative a new architecture for the production of thin film solar cells on directly on the lunar surface is proposed. The paper discusses experimental data on the fabrication and properties of lunar glass substrates, evaporated lunar regolith thin films (anti-reflect coatings and insulators), and preliminary attempts in ...
In 1972 a consortium consisting of Gebruder Sulzer A.G., Winterthur and EVT, Energie- und Verfahrenstechnik G.m.b.H., Stuttgart, was awarded the contract by HBR, Hochtemperatur Reaktorbau G.m.b.H., Koln/Mannheim, for the design, manufacture and installation of the 6 steam generator units for the prototype 300 MWe Thorium High Temperature Reactor (THTR) at Schmehausen, Germany. The design and manufacture of the 6 units is done by Sulzer; installation of the units as well as the manufacture of the external pipework and headers is done by EVT. The units are built under semiclean conditions in a special workshop at CCM-Sulzer in mantes, France. This workshop had been used previously for the manufacture of the steam generators for the nuclear power plants St. Laurent I, II, Vandellos (500 Mwe each) and EL-4 (70 Mwe). The present paper defines the operating conditions and the chemical composition of the materials used, including Alloy 800. Reasons ...
We present results from a comprehensive number of relativistic, time-dependent, axisymmetric simulations of the runaway instability of non-constant angular momentum thick discs around black holes. This second paper extends earlier results where only constant angular momentum discs were considered. All relevant aspects of the theory of stationary thick discs around rotating black holes, necessary to build the initial state in our simulations, are presented in great detail. The angular momentum of the discs is assumed to increase outwards with the radial distance according to a power law. The main simplifying assumptions of our approach are not to include magnetic fields and self-gravity in the discs. Furthermore, the dynamics of the spacetime is accounted for by computing the transfer of mass and angular momentum from the disc to the black hole through the event horizon : the evolution of the central black hole is assumed to follow a sequence of Kerr black holes of ...
This thesis is divided up into five chapters as outlined below. Chapter 1 gives the background to the techniques used in this thesis including X-ray structure determination and ab initio methods. An overview of some recent studies using ab initio methods to study transition metal complexes is also given. Chapter 2 investigates structural trans influence in a number of transition metal and p-block complexes. The database and ab initio studies showed that the classical trans influence model based on Pt(II) chemistry does not always hold. For some systems (eg. d sup 1 sup 0 s sup 0 for Sb sup V and Sn sup I sup V) the cis influence is of similar magnitude to the trans influence. For other systems (d sup 0), the trans influence is not as powerful as usually assumed. Chapter 3 is an investigation into the bridging chloride unit. A database study was performed on three systems (M-CI-M', M-CI...H and M-CI...Li/Na/K). Reaction pathway analysis was ...
The RELAP5 code has been developed for best-estimate transient simulation of light water reactor coolant systems during postulated accidents. The code models the coupled behavior of the reactor coolant system and the core for loss-of-coolant accidents and operational transients such as anticipated transient without scram, loss of offsite power, loss of feedwater, and loss of flow. A generic modeling approach is used that permits simulating a variety of thermal hydraulic systems. Control system and secondary system components are included to permit modeling of plant controls, turbines, condensers, and secondary feedwater systems. RELAP5/MOD3 code documentation is divided into seven volumes: Volume I presents modeling theory and associated numerical schemes; Volume II details instructions for code application and input data preparation; Volume III presents the results of developmental assessment cases that demonstrate and verify the models used ...
Low-frequency current noise and current-voltage (I-V) characteristics have been studied in InAs/GaAs self-assembled Quantum Dot Infrared Photodetectors in dark conditions and under illumination, at T = 77K and T = 5K. The noise behavior is consistent with a generation-recombination fluctuation process mainly related to thermally excited charge carriers at T = 77K. At T = 5K the current noise is consistent with a mechanism of fluctuations driven by the electric field, related to tunneling rather than emission-capture of charge carriers from the Quantum Dots. A very effective noise suppression mechanism, related to the tunneling regime, determines a decrease of fluctuation intensity as a function of the voltage. At T = 5K, an interesting behavior is observed in the current-voltage and noise power spectra for some of nominally identical QDIP structures in the presence of irradiation. Some devices indeed exhibit (i) a very high photoresponse and ...
We report the growth and fabrication of midwave infrared InAs/GaSb strain layer superlattice (SLS) detectors. Growth of alternate interfaces leads to a reduced strain between the GaSb buffer and SLS ({delta}a{sub parallel}/a=-5x10{sup -4}), enabling the growth of active regions up to 3 {mu}m (625 periods). The structural, optical, and electrical properties of the active region were characterized using x-ray crystallography and photoluminescence, respectively. p-i-n detectors were grown using 625 periods of 8 ML (monolayer) InAs/8 ML GaSb as the active region. The {lambda}{sub cutoff} for the detectors was 4.6 {mu}m with a conversion efficiency of 32% at V{sub b}=-0.2 V. Detectivity was obtained using noise power spectral density measurements under 300 K 2{pi} field of view illumination and was equal to 5.2x10{sup 10} and 3x10{sup 10} cm Hz{sup 1/2}/W (V{sub b}=-0.02 V, T=80 K) in the white noise and 1/f noise limit (at 50 Hz)
Current light water reactor (LWR) steam generators have been affected by a variety of corrosion and mechanical damage degradation mechanisms. Included are wear caused by tube vibration, intergranular corrosion, pitting, and thinning or wastage of the steam generator tubing and accelerated corrosion of carbon steel supports (denting). The Electric Power Research Institute (EPRI) and the Steam Generator Owners Groups (I, II) have sponsored laboratory and field studies to provide ameliorative actions for the majority of the damage forms experienced to date. Some of the current corrosion mechanisms are aggravated or caused by unique materials choices or materials interactions. New materials have been proposed and at least partially qualified for use in replacement model steam generators, including an advanced LWR design. In so far as possible, the materials choices for the advanced LWR steam generator avoid the corrosion pitfalls seemingly inherent ...
HD 100453 has an IR spectral energy distribution (SED) which can be fit with a power-law plus a blackbody. Previous analysis of the SED suggests that the system is a young Herbig Ae star with a gas-rich, flared disk. We reexamine the evolutionary state of the HD 100453 system by refining its age (based on a candidate low-mass companion) and by examining limits on the disk extent, mass accretion rate, and gas content of the disk environment. We confirm that HD 100453B is a common proper motion companion to HD 100453A, with a spectral type of M4.0V - M4.5V, and derive an age of 10 +/- 2 Myr. We find no evidence of mass accretion onto the star. Chandra ACIS-S imagery shows that the Herbig Ae star has L_X/L_Bol and an X-ray spectrum similar to non-accreting Beta Pic Moving Group early F stars. Moreover, the disk lacks the conspicuous Fe II emission and excess FUV continuum seen in spectra of actively accreting Herbig Ae stars, and from the FUV ...
The poisoning effects of various trace contaminants in the coal-derived syngas stream at ppm and sub-ppm level on the performance of Ni-YSZ/YSZ/LSM solid oxide fuel cells were studied at extended duration. The thermochemical nature of impurities such as PH{sub 3}(g) and CH{sub 3}Cl(g) in presence and absence of water steam was analyzed by a high temperature mass spectrometer. Only less than half of PH{sub 3}(g) is hydrolyzed, and CH{sub 3}Cl(g) also co-exist with HCl(g). After a certain duration of exposure, 1 ppm AsH{sub 3}(g), 0.5 ppm PH{sub 3}(g), and 2.5 ppm CH{sub 3}Cl(g) all caused some degree of degradation to the power density at 750 C. Whereas 1 ppm of H{sub 2}S(g) resulted in immediate performance loss. The mechanisms of degradation are mainly divided into two categories: surface adsorption effect (for S and Cl) and bulk reaction effect (for As and P). The controversies regarding the poisoning effect and mechanism of S are also discussed with the aid of ...
The paper describes the work underway to adapt a former US Navy diesel electric drive ship as a 2.4 Megawatt fuel cell powered, US Coast Guard operated, demonstrator. The Project will design the new configuration, and then remove the four 600 kW diesel electric generators and auxiliaries. It will design, build and install fourteen or more nominal 180 kW diesel fueled molten carbonate internal reforming direct fuel cells (DFCs). The USCG cutter VINDICATOR has been chosen. The adaptation will be carried out at the USCG shipyard at Curtis Bay, MD. A multi-agency (state and federal) cooperative project is now underway. The USCG prime contractor, AEL, is performing the work under a Phase III Small Business Innovation Research (SBIR) award. This follows their successful completion of Phases I and II under contract to the US Naval Sea Systems (NAVSEA) from 1989 through 1993 which successfully demonstrated the feasibility of diesel fueled DFCs. The ...
In order to develop competitive and reliable nuclear power generation systems, development of innovative structural design methods is indispensable and risk-based design approach based on the assessment of failure probability is being developed. Fatigue is commonly considered as an important contributor to failure probability in many components of reactor systems and its assessment gives a large influence on total reliability of the plants. In order to assess its effect on the reliability, propagation of cracks needs to be evaluated as well as their initiation and pre-existence probability. As a part of new design approach, efforts are being taken to develop a simplified estimation method for fatigue crack growth under cyclic application of thermal and thermo-mechanical loading. A simplified estimation method of J-integral based on reference stress method and elastic follow-up factor was developed based on many finite element analyses and evaluation of crack growth ...
Swift heavy ion-solid interaction leads in volume to track creation and on the surface to the ejection of particles into the vacuum. To learn more about initial mechanisms of track formation, we are focused on the sputtering of uranium dioxide by fast heavy ions. This present study is exclusively devoted to the influence of the electronic stopping power on the emission of neutral particles and especially on their angular distribution. These measurements are completed by those of the ions emitted from UO{sub 2} targets bombarded with swift heavy ions. The whole experimental results give access to: i) the nature of the sputtered particles; ii) the charge state of the emitted particles; iii) the direction of ejection of the sputtered particles ; iv) the sputtering yields deduced from the angular distributions. These results are compared to the prediction of the sputtering models proposed in the literature and it seems that the supersonic gas flow ...
Anadromous salmon in the Columbia River Basin are presently far below historic level of production, due to the impacts of development in the basin. To halt the downward trend in production and ultimately increase returns, the Northwest Power Planning Council developed the Columbia River Basin Fish and Wildlife Program. The Program outlines a coordinated plan for restoring anadromous salmonid runs to the basin. The goals and objectives outlined in the Program require addressing a complex set of problems that encompass a broad range of social, political, economic and biological issues. Resolution of these problems will require the efforts of a number of federal, state, and tribal agencies that have regulatory authority over activities that either directly or indirectly affect anadromous salmonids in the basin. Resource managers have realized the need for coordination in these efforts. The Coordinated Information System is designed to share information critical to ...
Metabolic carbon labelling experiments enable a large amount of extracellular fluxes and intracellular carbon isotope enrichments to be measured. Since the relation between the measured quantities and the unknown intracellular metabolic fluxes is given by bilinear balance equations, flux determination from this data set requires the numerical solution of a nonlinear inverse problem. To this end, a general algorithm for flux estimation from metabolic carbon labelling experiments based on the least squares approach is developed in this contribution and complemented by appropriate tools for statistical analysis. The linearization technique usually applied for the computation of nonlinear confidence regions is shown to be inappropriate in the case of large exchange fluxes. For this reason a sophisticated compactification transformation technique for nonlinear statistical analysis is developed. Statistical analysis is then performed by computing appropriate statistical quality measures like ...
The stability of a solid ice cover subjected to rapidly varying water levels and discharge was investigated. The support from the bank limits the stress in the ice cover and consequently bank contact must be maintained to ensure ice cover stability. An analysis was required of the stability of ice hinges, a flexible connection between a solid ice cover and the riverbank. Phase II and phase III of the research involved a field study of the Peace River, investigating the evolution of ice hinges with water level variation, from initial ice cover cracking parallel to the banks, to a fully developed hinge. A test program of midwinter discharge variations was undertaken to gather specific data and measurements of ice hinge link length, ice thickness, hinge joint behavior, riverbank geometry, and response of ice hinging to water level variation. As a result of the program, concepts developed throughout the study were confirmed, preliminary guidelines for hydroelectric ...
The National Bureau of Standards' (NBS) CW racetrack microtron (RTM) will be utilized as a driver for a free electron laser (FEL) oscillator. The NBS RTM possesses many exceptional properties of value for the FEL: i) CW operation, ii) energy from 20-185 MeV, iii) small energy spread and emittance, iv) excellent energy stability, and v) high average power. The 1-D FEL gain formula predicts that the FEL would oscillate at the fundamental approximately from 0.25 #mu#m to 10 #mu#m when up-grading the peak current to #>=# 2 A. In this paper, the authors present 3-D self-consistent numerical results including several realistic effects, such as emittance, betatron oscillations, diffraction and refraction. The results indicate that the design value of the transverse emittance is small enough that it does not degrade the FEL performance for intermediate to long wavelengths, and only slightly degrades the performance at the shortest wavelength under ...
The 3 MW TRIGA Mark-II research reactor of Bangladesh Atomic Energy Commission (BAEC) has been operating since September 14, 1986. The reactor is used for radioisotope production ("1"3"1I, "9"9"mTc, "4"6Sc), various R and D activities and manpower training. The reactor has been operated successfully since it's commissioning with the exception of a few reportable incidents. Of these, the decay tank leakage incident of 1997 is considered to be the most significant one. As a result of this incident, reactor operation at full power under forced-convection mode remained suspended for about 4 years. During that time, the reactor was operated at a power level of 250 kW so as to carry out experiments that require lower neutron flux. This was made possible by establishing a temporary by pass connection across the decay tank using local technology. The other incident was the contamination of the Dry Central Thimble (DCT) that took ...
Korea Atomic Energy Research Institute, using the ASME PRA Standard, evaluated the PSA model of the Korea Standard Nuclear Power Plant (KSNP) and identified the items to be improved to enhance its quality. The new risk monitor PSA model for the KSNP of which quality was enhanced is called as PRiME-U3i. The evaluation results of human reliability analysis (HRA) of the post-accident human errors in the PSA model of the KSNP showed that 10 items among 19 items of supporting requirements for those in the ASME PRA Standard were identified as them to be improved. Thus, we newly carried out a HRA for post-accident human errors for the KSNP PSA model as the target of grading its quality above ASME PRA Standard Category I+. Following tasks were additionally major tasks performed in the HRA of post-accident human errors of PRiME-U3i compared with the previous PSA model of the KSNP: interviews with operators in the collection and review of input data need for the HRA, ...
The report gives results of a second survey of the flue gas desulfurization (FGD) system on Unit 1 of Commonwealth Edison Co.'s Will County Station. The FGD system, started up in February 1972, uses a limestone slurry in two parallel scrubbing trains. Eac...
The report gives results of a second survey of the flue gas desulfurization (FGD) system on Unit 1 of Arizona Public Service Co.'s Cholla Station. The FGD system, commercially available in December 1973, uses a limestone slurry in two parallel scrubbing m...
The AT and T Round Cell has recently become a viable alternative to the conventional, rectangular, lead acid storage batteries in Class 1E applications at US nuclear generating stations. This paper discusses the qualification of the Round Cell for nuclear generating stations, its principal design attributes, the types of Class 1E applications most suited for the Round Cell, and industry experience related to its installation and operation.
Hydrogen injection into the reactor water has been applied to many BWR powerstations. Since hydrogen injected accelerates recombination of oxidant generated by water radiolysis, oxidant concentration, such as dissolved oxygen concentration in reactor water can be reduced. As the result of the reduction of oxidant concentration, Electrochemical Corrosion Potential (ECP) at the surface of structural material can be lowered. Lowered ECP moderates Stress Corrosion Cracking (SCC) sensitivity of structural materials, such as stainless steels. As usual, hydrogen injection system begins to work after the plant start-up is finished, when the condition of normal operation is established. Accordingly, Hydrogen Water Chemistry (HWC) does not cover all the period of plant operation. As far as SCC crack growth is considered, loss of HWC during plant start-up does not result in significant crack growth, because of duration of plant start-up is much shorter ...