This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.
The Hanford Site in eastern Washington state currently is engaged in the largest waste cleanup in world history. In order to make informed decisions about remediation options, the public throughout the Pacific Northwest and the nation needs to understand the wastes that are present, their sources of generation, their composition, and their behavior in the environment. The fact that Hanfordoperations` were conducted in secret for over four decades presents a unique public information challenge to those who currently are responsible for communicating with the public.
The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site.
This report represents the timetables, responsible organizations, and methods required to comply with the newly promulgated Washington Administrative Code (WAC) 173-360 Underground Storage Tank (UST) Regulations which became effective December 29, 1990. This report only addresses UST systems that contain nonradioactive material. A total of 84 tanks at the Hanford Site are currently regulated under WAC 173-360. In addition, 32 regulated tanks have been removed as a result of the federally mandated program and the newly implemented state regulations. The majority of the USTs at the Hanford Site are operated by Westinghouse Hanford; however, one is operated by Kaiser Engineers Hanford (KEH) and one by Pacific Northwest Laboratory (PNL).
This ACDR was performed following completed of the Conceptual Design Report in July 1992; the work encompassed August 1992 to January 1994. Mission of the WRAP Module 2A facility is to receive, process, package, certify, and ship for permanent burial at the Hanford site disposal facilities the Category 1 and 3 contact handled low-level radioactive mixed wastes that are currently in retrievable storage at Hanford and are forecast to be generated over the next 30 years by Hanford, and waste to be shipped to Hanford from about DOE sites. This volume provides an introduction to the ACDR process and the scope of the task along with a project summary of the facility, treatment technologies, cost, and schedule. Major areas of departure from the CDR are highlighted. Descriptions of the facility layout and operations are included.
Environmental data were collected for most environmental media including air, Columbia River water, external radiation, foodstuffs (milk, beef, eggs, poultry, and produce) and wildlife (deer, fish, and game birds), as well as soil and vegetation samples. In general, offsite levels of radionuclides attributable to Hanfordoperations during 1979 were indistinguishable from background levels. The data are summarized in the following highlights. Air quality measurements of NO/sub 2/ in the vicinity of the Hanford Site and releases of SO/sub 2/ onsite were well within the applicable federal and state standards. Particulate air concentrations exceed the standards primarily because of agricultural activities in the area. Discharges of waste water from Hanford facilities in the Columbia River under the National Pollution Discharge Elimination System (NPDES) permit were all within the parameter limits on the ...
The objective of the Hanford Environmental Dose Reconstruction Project (HEDR) is to estimate the potential radiation doses received by people living within the sphere of influence of the Hanford Site. A potential critical pathway for human radiation exposure is through the consumption of waterfowl that frequent onsite waste-water ponds or through eating of fish, shellfish, and waterfowl that reside in/on the Columbia River and its tributaries downstream of the reactors. This document summarizes information on fish, shellfish, and waterfowl radiation contamination for samples collected by Hanford monitoring personnel and offsite agencies for the period 1945 to 1972. Specific information includes the types of organisms sampled, the kinds of tissues and organs analyzed, the sampling locations, and the radionuclides reported. Some tissue concentrations are also included. We anticipate that these yearly summaries will be helpful ...
A decision must be made regarding whether the United State`s stockpile of neptunium should be discarded into the waste stream or kept for the production of Pu-238. Although the cost of long term storage is not inconsequential, to dispose of the material means the closing of our option to maintain control over our Pu-238 stockpile. Within the Fuels and Materials Examination Facility at Hanford there exists a remotely operated facility that can be converted for neptunium storage. This paper describes the facility and the anticipated handling requirements.
The Fast Flux Test Facility (FFTF) reactor characterization by the Hanford Engineering Development Laboratory (HEDL) includes extensive neutronic measurements during startup and initial operation. To aid in the handling and counting of the thousands of passive dosimeters used as part of this effort, an automated dosimetry specimen handling, positioning, and counting system was designed and developed by Westinghouse Hanford for the Department of Energy.
Environmental monitoring at the Hanford Site, located in southeastern Washington State, is conducted by Battelle Memorial Institute, Pacific Northwest Division, as part of its contract to operate the Pacific Northwest Laboratory (PNL) for the US Department of Energy. The data collected provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanfordoperations. Data are also collected to monitor several chemicals. Pacific Northwest Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1990 is a summary of offsite and onsite environmental monitoring data collected during 1990 by PNL`s Environmental Monitoring Program. The data summaries included in the annual report were created from individual surface and ...
Environmental monitoring at the Hanford Site, located in southeastern Washington State, is conducted by Battelle Memorial Institute, Pacific Northwest Division, as part of its contract to operate the Pacific Northwest Laboratory (PNL) for the US Department of Energy. The data collected provide a historical record of radionuclide and radiation levels attributable to natural causes, worldwide fallout, and Hanfordoperations. Data are also collected to monitor several chemicals. Pacific Northwest Laboratory publishes an annual environmental report for the Hanford Site each calendar year. The Hanford Site Environmental Report for Calendar Year 1990 is a summary of offsite and onsite environmental monitoring data collected during 1990 by PNL's Environmental Monitoring Program. The data summaries included in the annual report were created from individual ...
The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.
The objective of the Hanford Environmental Dose Reconstruction Project (HEDR) is to estimate the potential radiation doses received by people living within the sphere of influence of the Hanford Site. A potential critical pathway for human radiation exposure is through the consumption of waterfowl that frequent onsite waste-water ponds or through eating of fish, shellfish, and waterfowl that reside in/on the Columbia River and its tributaries downstream of the reactors. This document summarizes information on fish, shellfish, and waterfowl radiation contamination for samples collected by Hanford monitoring personnel and offsite agencies for the period 1945 to 1972. Specific information includes the types of organisms sampled, the kinds of tissues and organs analyzed, the sampling locations, and the radionuclides reported. Some tissue concentrations are also included. We anticipate that these yearly summaries will be helpful ...
The objective of the Hanford Environmental Dose Reconstruction Project (HEDR) is to estimate the potential radiation doses received by people living within the sphere of influence of the Hanford Site. A potential critical pathway for human radiation exposure is through the consumption of waterfowl that frequent onsite waste-water ponds or through eating of fish, shellfish, and waterfowl that reside in/on the Columbia River and its tributaries downstream of the reactors. This document summarizes information on fish, shellfish, and waterfowl radiation contamination for samples collected by Hanford monitoring personnel and offsite agencies for the period 1945 to 1972. Specific information includes the types of organisms sampled, the kinds of tissues and organs analyzed, the sampling locations, and the radionuclides reported. Some tissue concentrations are also included. We anticipate that these yearly summaries will be helpful ...
The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, ...
This document defines the quality system requirements for the US Department of Energy, Richland Operations Office (DOE-RL), Environmental Restoration (ER) Project at the Hanford Site. The Environmental Restoration Project Quality System Requirements for the Hanford Site integrates quality assurance requirements from the DOE Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), the Hanford Facility Resource Conservation and Recovery Act of 1976 (RCRA) Permit, and applicable Federal and Washington State regulations. This document, based on ten criteria, provides user organizations with the flexibility to incorporate only those criteria and paragraphs applicable to their specific scopes of work. The requirements of this document are to be applied based on a graded approach that takes into consideration the risk inherent in, as well as the importance ...
The Hanford Site, Richland, Washington, contains over 1,500 identified waste sites and numerous groundwater plumes that will be characterized and remediated over the next 30 years. As a result of the Hanford Federal Facility Agreement and Consent Order, the US Department of Energy (DOE) has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI/FS is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves highly radioactive and chemically contaminated soils. The initial phase of site characterization was designed to assess the nature and extent of contamination associated with the source waste sites within the 200-BP-1 operable unit. Characterization activities consisted of drilling and sampling, chemical and physical analysis of samples, and ...
to Cool Spots Hanford Fun Facts Classroom Projects Famous People of Hanford Counterintelligence Home Employee Responsibilities CI Information CI Resources Points of Contact...
Following revisions to the Tri-Party Agreement for Hanford Site cleanup, which specified vitrification for Complete melter feasibility and system operability immobilization of the low-level waste (LLW) tests, select reference melter(s), and establish reference derived from retrieval and pretreatment of the radioactive LLW glass formulation that meets complete systems defense wastes stored in 177 underground tanks, commercial requirements (June 1996). Available melter technologies were tested during 1994 to 1995 as part of a multiphase program to select reference Submit conceptual design and initiate definitive design technologies for the new LLW vitrification mission.
This report fulfills the annual environmental release reporting requirements of US Department of Energy (DOE) Order 5400.1. This report provides supplemental information to the Hanford Site Environmental Report (PNNL-11795). The Hanford Site Environmental Report provides an update on the environmental status of the Hanford Site. The sitewide annual report summarizes the degree of compliance with applicable environmental regulations and informs the public concerning the impact of Hanford Site operations on the surrounding environment. Like the Hanford Site Environmental Report, this annual report presents a summary of the environmental releases from facilities and activities managed by the Fluor Daniel Hanford, Incorporated (FDH), and Bechtel Hanford, Incorporated (BHI). In addition to the summary data, this report also ...
The Fast Flux Test Facility (FFTF) is a 400-megawatt (thermal) sodium-cooled reactor designed for irradiation testing of fuels, materials and components for LMRs. It is operated by the Westinghouse Hanford Company for the US Department of Energy on the government-owned Hanford reservation near Richland, Washington. The first 100-day operating cycle began in April 1982 and the eighth operating cycle was completed in July 1986. Argon is used as the cover gas for all sodium systems at the plant. A program for cover gas monitoring has been in effect since the start of sodium fill in 1978. The argon is supplied to the FFTF by a liquid argon Dewar System and used without further purification.
This report discusses the procedures that establish the configuration control processes for the Hanford Environmental Information System (HEIS) software. The procedures also provide the charter and function of the HEIS Configuration Control Board (CCB) for maintaining software. The software configuration control items covered under these procedures include the HEIS software and database structure. The configuration control processes include both administrative and audit functions. The administrative role includes maintaining the overall change schedule, ensuring consistency of proposed changes, negotiating change plan adjustments, setting priorities, and tracking the status of changes. The configuration control process audits to ensure that changes are performed to applicable standards.
The Fast Flux Test Facility (FFTF) is a 400 MWt sodium-cooled fast reactor operated by Westinghouse Hanford Company for the US Department of Energy to conduct fuels and materials testing in support of the US Liquid Metal Fast Breeder Reactor programme. Early in 1982, the FFTF began its first 100 day irradiation cycle. Since that time the plant has operated very well, achieving a cycle capacity factor of 94 per cent in the most recent irradiation cycle. The authors describe the results achieved in the first three cycles of operation and carrying through to the fourth reactor cycle which began in January 1984. (author).
to Cool Spots Hanford Fun Facts Classroom Projects Famous People of Hanford Counterintelligence Home Employee Responsibilities CI Information CI Resources Points of Contact...
The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding.
This document provides data on aerosol concentrations in tank headspaces, total mass of aerosols in the tank headspace, and mass of aerosols sent to the exhauster during rotary mode core sampling from November 1994 through June 1999. A decontamination factor for the RMCS exhauster filter housing is calculated based upon operational data and non-destructive assay.
This document provides data on aerosol concentrations in tank head spaces, total mass of aerosols in the tank head space and mass of aerosols sent to the exhauster during Rotary Mode Core Sampling from November 1994 through June 1999. A decontamination factor for the RMCS exhauster filter housing is calculated based on operation data.
Software quality assurance (SQA) for robotic systems used in nuclear waste applications is vital to ensure that the systems operate safely and reliably and pose a minimum risk to humans and the environment. This paper describes the SQA approach for the control and data acquisition system for a robotic system being developed for remote surveillance and inspection of underground storage tanks (UST) at the Hanford Site.
Separation of the bulk soluble chemical salts from the insoluble metal hydroxides and radionuclides is central to the strategy of disposing Hanford tank waste. Sludge washing and caustic leaching have been selected as the primary methods for processing the 230 million L (61,000,000 gal) of Hanford tank waste. These processes are very similar to those selected for processing waste at the West Valley Site in New York and the Savannah River Site in South Carolina. The purpose of sludge washing is to dissolve and remove the soluble salts in the waste. Leaching of the insoluble solids with caustic will be used to dissolve aluminum hydroxide and chromium hydroxide, and convert insoluble bismuth phosphate to soluble phosphate. The waste will be separated into a high-level solids fraction and a liquid fraction that can be disposed of as low-level waste after cesium removal. The washing and leaching operations involve batchwise ...
This document defines the quality assurance program requirements for the US Department of Energy, Richland Field Office, Environmental Restoration program at the Hanford Site. This document integrates quality assurance requirements from US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order, and applicable industry standards into a single source document for the development of quality assurance programs applicable to the Environmental Restoration program items and activities. This document has been configured into three parts and fifteen criteria to provide user organizations with a workable document that best facilitates line operations. When developing individual user organization quality assurance programs, the document configuration provides each organization with the Flexibility to incorporate only those parts and criteria that are applicable to their individual scope of work as it is ...
The Fast Flux Test Facility (FFTF) is a 400-MWt, sodium-cooled reactor located on the Hanford Site near Richland, Washington, USA. The FFTF is owned by the U.S. Department of Energy and is operated by the Westinghouse Hanford Company. The FFTF was designed to test fuels and materials for use in liquid metal reactors. Since initial operation in 1982, anticipated breaches of experimental fuel pins have released fission products, including cesium, into the primary sodium. Because of its high volatility, cesium vaporizes into the cover gas space, where it condenses on components and equipment and is transported into the cover gas outlet. Because of the long half-life of "1"3"7Cs, these deposits result in long-term, local radiation levels that make contact maintenance difficult. Thus, a cesium trap was installed in FFTF to reduce the cesium level in the sodium. The trap could also permit a Run Beyond ...
The Fast Flux Test Facility (FFTF)is a 400 MW (th) sodium-cooled fast flux test reactor located on the Hanford Site in southeastern Washington State. The FFTF is operated by the Westinghouse Hanford Company for the United States Department of Energy. The FFTF is a three loop plant designed primarily for the purpose of testing full-scale core components in an environment prototypic of future liquid metal reactors. The plant design emphasizes features to enhance this test capability, especially in the area of the core, reactor vessel, and refueling system. Eight special test positions are provided in the vessel head to permit contact instrumented experiments to be installed and irradiated. These test positions effectively divide the core into three sectors. Each sector requires its own In-Vessel Handling Machine (IVHM) to access all the core positions. Since the core and the in-vessel refueling components are submerged under ...
The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 ...
The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 ...
Radioactive waste has been stored in large underground storage tanks at the Hanford Site since 1944. Approximately 212 million liters of waste containing approximately 240,000 metric tons of processed chemicals and 177 mega-curies of radionuclides are now stored in 177 tanks. These caustic wastes are in the form of liquids, slurries, saltcakes, and sludge. In 1991, the Tank Waste Remediation System (TWRS) Program was established to manage, retrieve, treat, immobilize, and dispose of these wastes in a safe, environmentally sound, and cost-effective manner. The Department of Energy (DOE) has believes that it is feasible to privatize portions of the TWRS Program. Under the privatization strategy embodied in the Request for Proposal (RFP), DOE will purchase services from a contractor-owned, contractor-operated facility under a fixed-price contract. Phase I of the TWRS privatization strategy is a proof-of-concept/commercial demonstration-scale ...
The Fast Flux Test Facility (FFTF) reactor, which started operating in 1982, is a 400 MWt sodium-cooled fast neutron reactor located in Hanford, Washington State, and operated by Westinghouse Hanford Co. under contract with U.S. Department of Energy. The reactor has a wide variety of functions for irradiation tests and special tests, and its major purpose is the irradiation of fuel and material for liquid metal reactor, nuclear reactor and space reactor projects. The review first describes major technical specifications and current conditions of the FFTF reactor. Then the plan for irradiation testing is outlined focusing on general features, fuel pin/assembly irradiation tests, and absorber irradiation tests. Assemblies for special tests include the material open test assembly (MOTA), fuel open test assembly (FOTA), closed loop in-reactor assembly (CLIRA), and other special fuel assemblies. An interim ...
The Fast Flux Test Facility (FFTF) reactor, which started operating in 1982, is a 400 MWt sodium-cooled fast neutron reactor located in Hanford, Washington State, and operated by Westinghouse Hanford Co. under contract with U.S. Department of Energy. The reactor has a wide variety of functions for irradiation tests and special tests, and its major purpose is the irradiation of fuel and material for liquid metal reactor, nuclear reactor and space reactor projects. The review first describes major technical specifications and current conditions of the FFTF reactor. Then the plan for irradiation testing is outlined focusing on general features, fuel pin/assembly irradiation tests, and absorber irradiation tests. Assemblies for special tests include the material open test assembly (MOTA), fuel open test assembly (FOTA), closed loop in-reactor assembly (CLIRA), and other special fuel assemblies. An interim ...
The Fast Flux Test Facility (FFTF) is a liquid-metal-cooled test reactor located on the Hanford Site. The FFTF is the only reactor of this type designed and operated with the intent of meeting the licensing requirements of the Nuclear Regulatory Commission (NRC). Unique characteristics of the FFTF that present special challenges related to leak rate testing include thin wall containment vessel construction, cover gas systems that penetrate containment, and a low-pressure design basis accident. The successful completion in 1986 of the third FFTF Integrated Leak Rate Test (ILRT) five days ahead of schedule and 10% under budget was a major achievement for the Westinghouse Hanford Company. The success of this operational safety test was due in large part to a special local area network (LAN) of three IBM PC/XT computers that monitored the sensor data, calculated the containment vessel leak rate, and ...
This document defines the quality assurance requirements for the US Department of Energy-Richland Operations Office Environmental Restoration Remedial Action program at the Hanford Site. The Environmental Restoration Remedial Action program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. This document combines quality assurance requirements from various source documents into one set of requirements for use by the US Department of Energy-Richland Operations Office and other Environmental Restoration Remedial Action program participants. This document will serve as the basis for developing Quality Assurance Program Plans and implementing procedures by the participants. The requirements of this document will be applied to ...
The U.S. Department of Energy Order 435.1, Radioactive Waste Management, requires a disposal authorization statement authorizing operation (or continued operation) for low-level waste disposal facilities. In fulfillment of these requirements, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area burial grounds and the 200 West Area burial grounds. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area low-level burial grounds be written and approved by the Richland Operations Office. As a result of a record of decision for the Hanford Site Solid Waste Program and acceptance of the Hanford Site Solid Waste Environmental Impact Statement, the use of the low-level burial ground (LLBG) as a disposal ...
The Fast Flux Test Facility (FFTF) is a 400 Mwt sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory, Richland, Washington, to conduct fuels and materials testing in support of the US Liquid Metal Fast Breeder Reactor (LMFBR) program. Startup and initial power testing included a comprehensive series of nonnuclear and nuclear tests to verify the thermal, hydraulic, and neutronic characteristics of the plant. A specially designed series of natural circulation tests were then performed to demonstrate the inherent safety features of the plant. Early in 1982, the FFTF began its first 100-day irradiation cycle. Since that time the plant has operated very well, achieving a cycle capacity factor of 94% in the most recent irradiation cycle. Seventy-five specific test assemblies and 25,000 individual fuel pins have been irradiated, some in excess of 80 MWd/Kg.
This Maintenance Implementation Plan (MIP)was developed for implementation of the U.S. Department of Energy (DOE) Order 4330.4A, A Maintenance Implementation Program (DOE 1990) which has been replaced by 4330.4B (DOE 1994) at the Hanford Site SWM complex. It addresses maintenance functions associated with SWM, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for SWM was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The objective of this MIP is to provide baseline information for the control and execution of SWM Maintenance activities relative to the requirements of Order 4330.4B, Chapter II. (Nuclear Facilities) It also describes actions that are planned to achieve compliance. Section 2.0 of this MIP summarizes the mission, ...
Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the ...
The structural acceptance criteria contained herein for the evaluation of existing underground double-shell waste storage tanks located at the Hanford Site is part of the Life Management/Aging Management Program of the Tank Waste Remediation System. The purpose of the overall life management program is to ensure that confinement of the waste is maintained over the required service life of the tanks. Characterization of the present condition of the tanks, understanding and characterization of potential degradation mechanisms, and development of tank structural acceptance criteria based on previous service and projected use are prerequisites to assessing tank integrity, to projecting the length of tank service, and to developing and applying prudent fixes or repairs. The criteria provided herein summarize the requirements for the analysis and structural qualification of the existing double-shell tanks for continued operation. Code reconciliation ...
This Environmental Assessment evaluates the proposed action to operate two laboratory-size muffle furnaces in glovebox HC-21C, located in the Plutonium Finishing Plant (PFP), Hanford Site, Richland, Washington. The muffle furnaces would be used to stabilize chemically reactive sludges that contain approximately 25 kilograms (55 pounds) of plutonium by heating to approximately 500 to 1000{degrees}C (900 to 1800{degrees}F). The resulting stable powder, mostly plutonium oxide with impurities, would be stored in the PFP vaults. The presence of chemically reactive plutonium-bearing sludges in the process gloveboxes poses a risk to workers from radiation exposure and limits the availability of storage space for future plant cleanup. Therefore, there is a need to stabilize the material into a form suitable for long-term storage. This proposed action would be an interim action, which would take place prior to completion of an Environmental Impact ...
The technical baseline is a hierarchical description of the Hanford Site cleanup mission. This technical baseline does not address the science, technology, or economic transition missions. It begins with a definition of the existing conditions at the Hanford Site, provides a description of the end product or mission accomplishments at completion, presents a statement of the major requirements and constraints that must be observed during the performance of the mission, and provides a statement of the top-level strategic approach to accomplish the mission. Mission-level interfaces are also described. This information is further defined hierarchically in increasing levels of detail. This definition is composed of the following major elements: functions that are key task descriptions; requirements that are the measurable standards to which the functions must be performed; architectures which are specific engineering solutions or systems that ...
An aerial radiological survey was conducted over the Department of Energy's Hanford Site near Richland, Washington, during the period 5 July through 26 August 1988. The survey was expanded, and additional flights were conducted to the east of the site and along the banks of the Columbia River down to McNary Dam near Umatilla. The survey was flown at altitude of 61 meters (200 feet) by a helicopter containing 17 liters (eight 2 in. x 4 in. x 16 in.) of sodium iodide detectors. Gamma ray data were collected over the survey area by flying north-south lines spaced 122 meters (400 feet) apart. The processed data indicated that detected radioisotopes and their associated gamma ray exposure rates were generally consistent with those expected from normal background emitters and man-made fission/activation products resulting from activities at the site. External exposure rates were generally 10 microroentgens per hour (#mu#R/h) with some operating areas ...
The FFTF is a 400-MWt sodium-cooled fast neutron flux test reactor located on the US government-owned Hanford Site in southeastern Washington state. The reactor is operated for the US Department of Energy by the Westinghouse Hanford Company. Since FFTF started routine operation in 1982, the commercially fabricated driver fuel has performed flawlessly to well beyond the design goal peak burnup of 80 MWd/kgM. The core average discharge exposure is now some 60% beyond the original design expectations and attests to the ruggedness and reliability of the mixed oxide fuel system. In Cycle 9 sixteen long-life assemblies were installed to begin the irradiation of mixed oxides in the advanced low-swelling alloy HT-9 as the Core Demonstration Experiment (CDE). Operation of the plant from initial startup testing to ten cycles of operation has confirmed that the nuclear ...
The Rotary Mode Core Sample System (RMCSS) is used to obtain stratified samples of the waste deposits in single-shell and double-shell waste tanks at the Hanford Site. The samples are used to characterize the waste in support of ongoing and future waste remediation efforts. Four sampling trucks have been developed to obtain these samples. Truck I was the first in operation and is currently being used to obtain samples where the push mode is appropriate (i.e., no rotation of drill). Truck 2 is similar to truck 1, except for added safety features, and is in operation to obtain samples using either a push mode or rotary drill mode. Trucks 3 and 4 are now being fabricated to be essentially identical to truck 2.
Development testing has been conducted by Rockwell HanfordOperations (Rockwell) with simulated Fast Flux Test Facility (FFTF) Reactor fuel and unirradiated N-Reactor fuel, to identify the various problems associated with rotary shearing these fuels. This report discusses the results of tests segmenting FFTF and N-Reactor fuels using electrically driven slow-speed rotary shredders. From these tests, it has been determined that slow-speed rotary shredding of both fuels can be accomplished. Final equipment arrangements and operating parameters have been established for definitive design of the FFTF Rotary Shear. Development testing is continuing on the N-fuel rotary shear. However, it has been established that two-stage shearing is necessary and the outer N-fuel elements pose few problems, while the smaller inner elements have created numerous problems, which are being addressed.
The Hanford Waste Vitrification Plant Project has been established to convert the high-level radioactive waste associated with nuclear defense production at the Hanford Site into a waste form suitable for disposal in a deep geologic repository. The Hanford Waste Vitrification Plant will mix processed radioactive waste with borosilicate material, then heat the mixture to its melting point (vitrification) to forin a glass-like substance that traps the radionuclides in the glass matrix upon cooling. The Hanford Waste Vitrification Plant Quality Assurance Program has been established to support the mission of the Hanford Waste Vitrification Plant. This Quality Assurance Program Description has been written to document the Hanford Waste Vitrification Plant Quality Assurance Program.
The US Department of Energy (DOE) is now evaluating its facility requirements in support of its cleanup mission at Hanford. One of the early findings is that the 200-Area steam plants, constructed in 1943, will not meet future space heating and process needs. Because the 200 Area will serve as the primary area for waste treatment and long-term storage, a reliable steam supply is a critical element of Hanfordoperations. This Analysis and Decision Document (ADD) is a preliminary review of the steam supply options available to the DOE. The ADD contains a comprehensive evaluation of the two major acquisition options: line-term versus privatization. It addresses the life-cycle costs associated with each alternative, as well as factors such as contracting requirements and the impact of market, safety, security, and regulatory issues. Specifically, this ADD documents current and future steam requirements for the 200 Area, ...
'As part of the Computer Protection Plan, this Network Security Plan identifies the specific security measures used to protect Bechtel Hanford, Inc.'s (BHI's) enterprise network. The network consists of the communication infrastructure and information systems used by BHI to perform work related to the Environmental Restoration Contract (ERC) at the Hanford Site. It provides electronic communication between the ERC-leased facilities in Richland, Washington, and facilities located on the Hanford Site. Network gateways to other site and offsite networks provide electronic communication with the remainder of the Hanford community.'
This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to ...
The Fast Flux Test Facility (FFTF) is a liquid-metal-cooled test reactor located on the Hanford site. A dual computer system has been developed to monitor the reactor cover gas to detect and characterize any fuel or test pin fission gas releases. The system acquires gamma spectra data, identifies isotopes, calculates specific isotope and overall cover gas activity, presents control room alarms and displays, and records and prints data and analysis reports. The fission gas monitor system makes extensive use of commercially available hardware and software, providing a reliable and easily maintained system. The design provides extensive automation of previous manual operations, reducing the need for operator training and minimizing the potential for operator error. The dual nature of the system allows one monitor to be taken out of service for periodic tests or maintenance without interrupting the overall ...
Fuel Management at the Fast Flux Test Facility (FFTF) involves more than just the usual ex-core and in-core management of standard fuel and non-fuel components between storage locations and within the core since it is primarily an irradiation test facility. This mission involves testing an ever increasing variety of fueled and non-fueled experiments, each having unique requirements on the reactor core as well as having its own individual impact on the reload design. This paper describes the fuel management process used by the Westinghouse Hanford Company Core Engineering group that has led to the successful reload design of nine operating cycles and the irradiation of over 120 tests.
This document describes an educational program designed to provide a pool of highly qualified administrative, technical, and managerial graduates that are familiar with the Hanford Site and business operations. The program is designed to provide work experience and mentoring to a culturally diverse student base which enhances affirmative employment goals. Short-term and long-term objectives of the program are outlined in the report, and current objectives are discussed in more detail. Goals to be completed by the year 2003 are aimed at defining the criteria necessary to establish partnerships between schools, community organizations, and human resources departments. Actions to be implemented includes providing instructors and equipment, enhancing skills of local teachers, and establishing collaboration with human resources organizations. Long-term goals of the program are to ensure a constant supply of qualified, trained workers to support ...
The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, ...
This report summarizes the major activities conducted in the Chemical and Energy Research Section of the Chemical Technology Division at Oak Ridge National Laboratory (ORNL) during the period October--December 1997. The section conducts basic and applied research and development in chemical engineering, applied chemistry, and bioprocessing, with an emphasis on energy-driven technologies and advanced chemical separations for nuclear and waste applications. The report describes the various tasks performed within six major areas of research: Hot Cell Operations, Process Chemistry and Thermodynamics, Separations and Materials Synthesis, Fluid Structure and Properties, Biotechnology Research, and Molecular Studies. The name of a technical contact is included with each task described, and readers are encouraged to contact these individuals if they need additional information. Activities conducted within the area of Hot Cell Operations included ...
This report is a summary of the environmental status of the Hanford Site in 1989. It includes descriptions of the Site and its mission, the status of compliance with environmental regulations, planning and activities to accomplish compliance, environmental protection and restoration activities, and environmental monitoring. 97 refs., 67 figs., 14 tabs.
The founding of the Hanford Engineering Works to produce plutonium is described. The 45-year defense mission has now been replaced with a peaceful mission, that of being the first site for massive cleanup of the 45-year nuclear waste. In order to establish a remedial investigation and feasibility plan, a process of discovery named the Technical Baseline Report must be performed; the task of this process is to discover all that is known about a proposed cleanup site (what the waste was, where did it go). When none of the documentation can answer the question, oral history is utilized. Some of the problems associated with the conduct of oral history interviews are described, particularly Hanford`s legacy of secrecy.
In early 2004, the U.S. Department of Energy (DOE) Richland and Fluor Hanford requested technical assistance from the DOE Headquarters EM-23 Technical Assistance Program to provide a team of technical experts to develop recommendations for mending the In Situ Redox Manipulation (ISRM) Barrier in the 100-D Area of the Hanford Site in Washington State. To accommodate this request, EM-23 provided support to convene a group of technical experts from industry, a national laboratory, and a DOE site to participate in a 2 1/2-day workshop with the objective of identifying and recommending options to enhance the performance of the 100-D Area reactive barrier and of a planned extension to the northeast. This report provides written documentation of the team's findings and recommendations. In 1995, a plume of dissolved hexavalent chromium [Cr(VI)], which resulted from operation of the D/DR Reactors at the ...
The US Department of Energy (DOE) Defense Waste Management Plan has the objective of final disposal for high-level waste (HLW) generated from defense programs. The DOE sites that generate HLW are located at the Savannah River Operations Office in Aiken, South Carolina, the Hanford site in Richland, Washington, and the Idaho Operations Office in Idaho Falls, Idaho. The purpose in the development of a quality assurance (QA) specification for organizations involved in HLW production is to establish uniform requirements that ensure that radioactive waste is converted to a waste form and canistered in such a way that it is acceptable in a federal repository licensed by the US Nuclear Regulatory Commission (NRC). A QA specification has been developed that will be applied to those activities important to certification of the product. The basic requirements are defined in national consensus standards and DOE directives. The ...
SRS high-level radioactive waste tanks will not experience erosion corrosion to any significant degree during slurry pump operations. Erosion corrosion in carbon steel structures at reported pump discharge velocities is dominated by electrochemical (corrosion) processes. Interruption of those processes, as by the addition of corrosion inhibitors, sharply reduces the rate of metal loss from erosion corrosion. The well-inhibited SRS waste tanks have a near-zero general corrosion rate, and therefore will be essentially immune to erosion corrosion. The experimental data on carbon steel erosion corrosion most relevant to SRS operations was obtained at the Hanford Site on simulated Purex waste. A metal loss rate of 2.4 mils per year was measured at a temperature of 102 C and a slurry velocity comparable to calculated SRS slurry velocities on ground specimens of the same carbon steel used in SRS waste tanks. Based on these data ...
This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of ...
This Maintenance Implementation Plan (MIP) has been developed for. implementation of the US Department of Energy (DOE) Order 4330.4A. Maintenance Implementation Program (DOE 1990) at the Hanford Site Solid Waste complex. It addresses maintenance functions associated with Solid Waste Management, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for Solid Waste was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The MIP assessment disclosed that most elements defined in the order are currently implemented for Solid Waste. It also identified issues which must be addressed to bring the maintenance function into full compliance with DOE Order 4330.4A. These include documentation of the maintenance training program, expanded scope ...
The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste.
The operation of nuclear processing facilities and defense-related nuclear activities has resulted in contamination of near-surface and deep-subsurface sediments with both radionuclides and metals. The presence of mixed inorganic contaminants may result in undetectable microbial populations or microbial populations that are different from those present in uncontaminated sediments. To determine the impact of mixed radionuclide and metal contaminants on sediment microbial communities, we sampled a processing pond that was used from 1948 to 1975 for the disposal of radioactive and metal-contaminated wastewaters from laboratories and nuclear fuel fabrication facilities on the Hanford Site in Washington State. Because the Hanford Site is located in a semiarid environment with average rainfall of 159 mm/year, the pond dried and a settling basin remained after wastewater input into the pond ceased in 1975. This processing pond ...
The Richland Operations Office (RL) and Office of River Protection (ORP) are pleased to issue the attached Pollution Prevention Progress Report. We have just met the most aggressive waste reduction and A recycling goals to date and are publishing this report to recognize A the site's progress, and to ensure it will sustain success beyond 1 Fiscal Year 2000. This report was designed to inform the been made by RL and ORP in Waste Minimization (WMin) and Pollution Prevention (P2). RL, ORP and their contractors are committed to protecting the environment, and we reiterate pollution prevention should continue to be at the forefront of the environmental cleanup and research efforts. As you read the attached report, we believe you will see a clear demonstration of RL and ORP's outstanding performance as it has been responsible and accountable to the nation, its employees, and the community in which we live and work. commitment that all employees have for ...
More important than waste generation numbers, the pollution prevention and waste minimization successes achieved at Hanford in 1993 have reduced waste and improved operations at the Site. Just a few of these projects are: A small research nuclear reactor, unused and destined for disposal as low level radioactive waste, was provided to a Texas University for their nuclear research program, avoiding 25 cubic meters of waste and saving $116,000. By changing the slope on a asphalt lot in front of a waste storage pad, run-off rainwater was prevented from becoming mixed low level waste water, preventing 40 cubic meters of waste and saving $750,000. Through more efficient electrostatic paint spraying equipment and a solvent recovery system, a paint shop reduced hazardous waste by 3,500 kilograms, saving $90,800. During the demolition of a large decommissioned building, more than 90% of the building's material was recycled by crushing the concrete for ...
This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope ...
The Fast Flux Test Facility (FFTF) is a 400-MW(t) sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory in Richland, Washington, to conduct fuels and materials testing in support of the US liquid-metal fast breeder reactor program. Startup and initial power testing included a comprehensive series of nuclear and nonnuclear tests to verify the thermal and neutronic characteristics of the plant and to demonstrate its inherent safety features. Extensive reactor core characterization measurements were completed to provide the neutron and gamma spectra, fission rates, and other physics data needed to design and evaluate tests irradiated in the FFTF. A specially designed series of natural-circulation tests was performed to demonstrate the inherent safety features of the plant. Early in 1982 the FFTF began its first 100-d irradiation cycle. Since that time the plant has operated beyond expectations; ...
An updated listing of the vascular plants of the Hanford Site is provided, along with discussions of how humans may interact with local plants and have influenced the regional flora. Based on examinations of herbarium collections at the Westinghouse Hanford Company, Pacific Northwest Laboratory, Washington State University, and Brigham Young University, 590 vascular plant species have been identified on or near the Hanford Site. This is more than twice the number of species on previously published lists of Hanford Site vascular plants. A review of the plant species that are currently listed as endangered, threatened, sensitive, or otherwise of concern to the Washington State Natural Heritage Program and the Federal Fish and Wildlife Service is included. Color photographs of selected species are included to aid identification. Lists are provided of the Hanford Site plant species that ...
This is the ninth quarterly report as required by the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1990), also known as the Tri-Party Agreement, established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The Tri-Party Agreement sets the plan and schedule for achieving regulatory compliance and cleanup of waste sites at the Hanford Site. This report covers progress for the quarter that ended June 30, 1991. A total of 87 milestones have been completed to date. 39 refs., 1 fig.
A large amount of radioactive waste has been stored safely at the Savannah River and Hanford sites over the past 46 years. The aim of this report is to review the experimental corrosion studies at Savannah River and Hanford with the intention of identifying the types and rates of corrosion encountered and indicate how these data contribute to tank failure predictions. The compositions of the High-Level Wastes, mild steels used in the construction of the waste tanks and degradation-modes particularly stress corrosion cracking and pitting are discussed. Current concerns at the Hanford Site are highlighted.
The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach of the Columbia River. The evaluation, in the fifth year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 2001 field season.
The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the fourth year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 2000 field season.
The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the third year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1999 field season.
The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the second year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fish species, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1998 field season.
The Fast Flux Test Facility (FFTF) is a liquid-metal-cooled, fast neutron test reactor located on the Hanford Site. A dual computer system has been developed to monitor the reactor cover gas to detect and characterize any fuel or test pin fission gas releases. The system acquires gamma spectra data, identifies isotopes, calculates specific isotope and overall cover gas activity, presents control room alarms and displays, and records and prints data and analysis reports. The Fission Gas Monitor System (FGMS) integrates commercially available hardware and software, providing a reliable and easily maintained system. The design provides extensive automation of previous manual operations, reducing the need for operator training and minimizing the potential for operator error. The dual nature of the system allows either system A or B to be taken out of service for periodic tests or maintenance without ...
Testing was initiated in March 1991 and completed in November 1992 to determine the rate at which asphalt is biodegraded by microorganisms native to the Hanford Site soils. The asphalt tested (AR-6000, US Oil, Tacoma, Washington) is to be used in the construction of a diffusion barrier for the Hanford grout vaults. Experiments to determine asphalt biodegradation rates were conducted using three separate test sets. These test sets were initiated in March 1991, January 1992, and June 1992 and ran for periods of 6 months, 11 months, and 6 months, respectively. The experimental method used was one originally developed by Bartha and Pramer (1965), and further refined by Bowerman et al. (1985), that determined the asphalt biodegradation rate through the measurement of carbon dioxide evolved.
This presentation focuses on the steps taken by the Westinghouse Hanford Company to meet an accelerated schedule for configuration and implementation of the MULTI LIMS in a multiple laboratory environment. The Westinghouse Hanford Company purchased the MULTI LIMS Laboratory Information Management System in August, 1993. Hardware delivery began in October, 1993. Less than four months later, the initial configuration was released for use in two Westinghouse Hanford Company laboratories. Several major obstacles were overcome during implementation. These include information gathering for base table loading, user training, acceptance of the new system by users of a legacy system, and hardware configuration issues. In summary, steps needed to be taken to meet the accelerated implementation schedule of the MULTI LIMS at the Hanford Site. The obstacles faced were overcome through the in-depth knowledge and help ...
This description of work (DOW) details the field activities associated with the sampling of the vadose zone soils beneath the 1301-N and 1325-N cribs and trenches and will serve as a field guide for those performing the work. These activities are undertaken pursuant to the Hanford Federal Facility Agreement and Consent Order (Ecology et al., 1994a) Milestone M-16-94-01H-Tl and the June 30, 1994 Milestone Change Request M-16-94-02 (Ecology et al., 1994b). Three vadose zone borings, 1301-N-1, 1301-N-2, and 1325-N-1, will be constructed to investigate the vertical and horizontal distribution of radionuclide contamination in sediments beneath the cribs and trenches. The boreholes are also intended to intersect subsurface areas that may have been contaminated by dangerous wastes, i.e., metals, in effluent disposed during past operation of the facilities. This limited field investigation will provide data for the evaluation of remedial alternatives. ...
The U. S. Department of Energy (DOE) is required by Comprehensive Environmental Response, Compensation, and Liability Act of 1980 regulations to develop a conceptual understanding of potential contaminant releases from the Hanford Site based on an evaluation of existing data and known historical practices. Polychlorinated biphenyls (PCBs) are one environmental contaminant potentially released through leaks, spills, or disposal. This document presents a summary of selected relevant existing information, including environmental studies and Hanford Site analytical data.
This document provides structural load requirements and their basis for maintaining the structural integrity of the Hanford Single-Shell Tanks during waste feed delivery and retrieval activities. The requirements are based on a review of previous requirements and their basis documents as well as load histories with particular emphasis on the proposed lead transfer feed tanks for the privatized vitrification plant.
This report is an Implementation Guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511 to provide a set of uniform instructions for managing the two contractors selected. The primary objective is to produce the necessary deliverables and services for the HTI project within schedule and budget.
The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy Field Office, Richland (RL) in 1987 as part of Pacific Northwest Laboratory. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with federal statutes and regulations. This report summarizes activities of the HCRL during fiscal year (FY) 1990. The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan (HCRMP) as a prioritized list of tasks. The task list guided cultural resources management activities during FY 1990 and is the outline for this report. In order, these tasks were to (1) conduct cultural resource reviews, (2) develop an archaeological resources protection plan, (3) monitor the condition of known archaeological sites, (4) plan a curation system for artifacts and records, (5) evaluate ...
The EPA has designated vitrification as the best developed available technology for immobilization of High-Level Nuclear Waste. In a recent federal facilities compliance agreement between the EPA, the State of Washington, and the DOE, the DOE agreed to vitrify all of the Low Level Radioactive Waste resulting from processing of High Level Radioactive Waste stored at the Hanford Site. This is expected to result in the requirement of 100 ton per day Low Level Radioactive Waste melters. Thus, there is increased need for the rapid adaptation of commercial melter equipment to DOE`s needs. DOE has needed a facility where commercial pilot scale equipment could be operated on surrogate (non-radioactive) simulations of typical DOE waste streams. The DOE/Industry Center for Vitrification Research (Center) was established in 1992 at the Clemson University Department of Environmental Systems Engineering, Clemson, SC, to address that need. This report ...
Plans for the disposal of radioactive liquid and solid wastes presently stored in double-shell tanks at the Hanford Site call for retrieval and processing of the waste to create forms suitable for permanent disposal. Waste will be retrieved from a tank using a submerged slurry pump in conjunction with one or more rotating slurry jet mixer pumps. Pacific Northwest Laboratory (PNL) has conducted tests using simulated waste slurries to assess the effects of a impinging slurry jet on the corrosion rate of the tank wall and floor, an action that could potentially compromise the tank's structural integrity. Corrosion processes were investigated on a laboratory scale with a simulated neutralized cladding removal waste (NCRW) slurry and in a subsequent test with simulated neutralized current acid waste (NCAW) slurry. The test slurries simulated the actual NCRW and NCAW both chemically and physically. The tests simulated those conditions expected to exist in the ...
Plans for the disposal of radioactive liquid and solid wastes presently stored in double-shell tanks at the Hanford Site call for retrieval and processing of the waste to create forms suitable for permanent disposal. Waste will be retrieved from a tank using a submerged slurry pump in conjunction with one or more rotating slurry jet mixer pumps. Pacific Northwest Laboratory (PNL) has conducted tests using simulated waste slurries to assess the effects of a impinging slurry jet on the corrosion rate of the tank wall and floor, an action that could potentially compromise the tank`s structural integrity. Corrosion processes were investigated on a laboratory scale with a simulated neutralized cladding removal waste (NCRW) slurry and in a subsequent test with simulated neutralized current acid waste (NCAW) slurry. The test slurries simulated the actual NCRW and NCAW both chemically and physically. The tests simulated those conditions expected to exist in the respective ...
This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the ...
A new opportunity to improve the safety and efficiency of environmental restoration operations, using robotics has emerged from advances in industry, academia, and government labs. Self-Guided Vehicles (SGV`s) have recently been developed in industry and early systems have already demonstrated much, though not all, of the functionality necessary to support driverless transportation of waste within and between processing facilities. Improved materials databases are being developed by at least two DOE remediation sites, the Fernald Environmental Management Project (FEME) in the State of Ohio and the Hanford Complex in the State of Washington. SGV`s can be developed that take advantage of the information in these databases and yield improved dispatch, waste tracking, report and shipment documentation. In addition, they will reduce the radiation hazard to workers and the risk of damaging containers through accidental collision. In this document, ...
A testing program has been conducted by the Westinghouse Hanford Company to confirm the baseline waste form selection for use in Waste Receiving and Processing (WRAP) Module 2A. WRAP Module 2A will provide treatment required to properly dispose of containerized contact-handled, mixed low-level waste at the US Department of Energy Hanford Site in south-central Washington State. Solidification/stabilization has been chosen as the appropriate treatment for this waste. This work is intended to test cement-based, thermosetting polymer, and thermoplastic polymer solidification media to substantiate the technology approach for WRAP Module 2A. Screening tests were performed using the major chemical constituent of each waste type to measure the gross compatibility with the immobilization media and to determine formulations for more detailed testing. Surrogate materials representing each of the eight waste types were prepared in the laboratory. These ...
The purpose of this report is to summarize the assumptions, dose factors, consumption rates, and methodology used to evaluate potential radiation doses to persons who may eat contaminated wildlife or contaminated plants collected from the Hanford Site. This report includes a description of the number and variety of wildlife and edible plants on the Hanford Site, methods for estimation of the quantities of these items consumed and conversion of intake of radionuclides to radiation doses, and example calculations of radiation doses from consumption of plants and wildlife. Edible plants on the publicly accessible margins of the shoreline of the Hanford Site and Wildlife that move offsite are potential sources of contaminated food for the general public. Calculations of potential radiation doses from consumption of agricultural plants and farm animal products are made routinely and reported annually for those produced offsite, ...
Recently, the Tri-Party Agreement (TPA) among the State of Washington Department of Ecology, U.S. Department of Energy (DOE) and the US Environmental Protection Agency (EPA) for the cleanup of the Hanford Site was renegotiated. The revised agreement specifies vitrification as the encapsulation technology for low level waste (LLW). A demonstration, testing, and evaluation program underway at Westinghouse Hanford Company to identify the best overall melter-system technology available for vitrification of Hanford Site LLW to meet the TPA milestones. Phase I is a {open_quotes}proof of principle{close_quotes} test to demonstrate that a melter system can process a simulated highly alkaline, high nitrate/nitrite content aqueous LLW feed into a glass product of consistent quality. Seven melter vendors were selected for the Phase I evaluation: joule-heated melters from GTS Duratek, Incorporated (GDI); Envitco, Incorporated (EVI); ...
Concentrations of {sup 90}Sr and {sup 137}Cs in Carey`s balsamroot (Balsamorhiza careyana) and Gray`s desert parsley (Lomatium grayi) were similar to concentrations observed in other plants collected on the Hanford Site and from offsite locations surrounding the Site as part of annual Hanford Site surveillance. Observed concentrations may be attributed to historic fallout more than to Hanford Site emissions, although the observation that 200 Area plants had slightly higher concentrations of {sup 137}Cs than 100 Area plants is consistent with other monitoring data of radioactivity in soil and vegetation collected onsite. The present concentrations of {sup 90}Sr and {sup 137}Cs in balsamroot and parsley fluctuate around background levels with some of the higher observed concentrations of {sup 90}Sr found on the Fitzner/Eberhardt Arid Lands Ecology (ALE) Reserve. Analytical results and summary statistics by species and ...
The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.
This document provides information on septic systems with a design capacity of greater than 14,500 gal/d and cribs submitted as requested by the Washington State Department of Ecology. Data for this submittal were taken from the Waste Information Database System (WIDS) and the Hanford Environmental Compliance Record (HECR) database. The current definition used in WIDS for an ''inactive facility'' is one that either no longer receives waste or plans to in the future. Information concerning the deactivation method for a facility is included when such information is available.
Abstract: The Hanford Tanks Initiative (HTI) is a five-year project resulting from the technical and financial partnership of the U.S. Department of Energy`s Office of Waste Management (EM-30) and Office of Science and Technology Development (EM-50). The HTI project accelerates activities to gain key technical, cost performance, and regulatory information on two high-level waste tanks. The HTI will provide a basis for design and regulatory decisions affecting the remainder of the Tank Waste Remediation System`s tank waste retrieval Program.
The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency.
An independent chemical compatibility review of various wrapping and absorbent/padding materials was conducted to evaluate resistance to chemicals and constituents present in liquid waste from the Hanford underground tanks. These materials will be used to wrap long-length contaminated equipment when such equipment is removed from the tanks and prepared for transportation and subsequent disposal or storage. The materials studied were Cooley L18KU, Herculite, and Elephant Mat. The study concludes that these materials are appropriate for use in this application.
This report documents radionuclide air emission from the Hanford Site in 1997, and the resulting effective dose equivalent to the maximally exposed member of the public, referred to as the MEI. The report has been prepared in accordance with reporting requirements in the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emissions Standards for Hazardous Air Pollutants, Subpart H, National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities. This report has also been prepared in accordance with the reporting requirements of the Washington Administrative Code Chapter 246-247, Radiation Protection-Air Emissions. The effective dose equivalent to the MEI from the Hanford Site`s 1997 point source emissions was 1.2 E-03 mrem (1.2 E-05 mSv), which is well below the 40 CFR 61 Subpart H regulatory limit of 10 mrem/yr. Radon and thoron emissions, exempted from 40 CFR ...
An ion exchange unit has been manufactured for WSRC by British Nuclear Fuels, Ltd. This unit consists of three columns, ancillary valving, pumps, lines, and computer controls. It has been delivered to TNX for use in testing a cesium-specific ion exchange resin, developed at WSRC as a potential second generation process for the decontamination of Defense Waste Processing Facility (DWPF) supernate. This resin also has Department of Energy applications at both Oak Ridge and Hanford. Oak Ridge is interested in decontaminating the Melton Valley storage tank supernate, while Hanford is interested in decontaminating the 101-AW and 101-SY supernate streams. Another potential developmental interest is the Savannah River Site (SRS) DWPF recycle stream. The three primary waste streams of interest are the Oak Ridge, Hanford, and SRS, SWPF supernate streams. For these three waste streams, the cesium decontamination factor (DF) will be ...
Magnetic particles (MAG*SEP"S"M) coated with various absorbents were evaluated for the separation and recovery of low concentrations of cesium from nuclear waste solutions. The MAG*SEP"S"M particles were coated with (1) clinoptilolite, (2) transylvanian volcanic tuff, (3) resorcinol formaldehyde, and (4) crystalline silico-titanate, and then were contacted with a Hanford supernatant simulant. Particles coated with the crystalline silico-titanate were identified by Bradtec as having the highest capacity for cesium removal under the conditions tested (variation of pH, ionic strength, cesium concentration, and absorbent/solution ratio). The MAG*SEP"S"M particles coated with resorcinol formaldehyde had high distribution ratios values and could also be used to remove cesium from Hanford supernant simulant. Gamma irradiation studies were performed on the MAG*SEP"S"M particles with a gamma dose equivalent to 100 cycles of use. This irradiation ...
This report documents radionuclide air emissions from the Hanford Site in I998 and the resulting effective dose equivalent to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants (40 CFR SI), Subpart H, ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities,'' and with the Washington Administrative Code Chapter 246-247, Radiation Protection--Air Emissions. The federal regulations in 40 CFR 61, Subpart H; require the measurement and reporting of radionuclides emitted from Department of Energy facilities and the resulting offsite dose from those emissions. A standard of 10 mrem/yr effective dose equivalent (EDE) is imposed on them. The EDE to the MEI due to routine emissions in ...
A major new initiative to develop and irradiate a long-life mixed oxide fuel system in the Fast Flux Test Facility (FFTF) has been implemented by the Westinghouse Hanford Company at the Hanford Engineering Development Lab. for the US Dept. of Energy. The purpose of this new fuel system, called the Core Demonstration Experiment (CDE), is to demonstrate the capability of achieving a 3-yr life in a prototypical heterogeneous reactor environment under prototypical power and temperature conditions. Three Core Demonstration Lead Experiments (CDLEs) will establish the performance characteristics of entire fuel assemblies of wire-wrapped, large diameter, advanced oxide fuel pins with HT-9 stainless steel alloy cladding and wire wrap and an HT-9 duct. Their performance characteristics provided the basis for design, fabrication, and irradiation of the CDE.
The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades.
Research at the Savannah River Technology Center aided development of a technical design basis for a Waste Treatment Plant (WTP) to pre-treat and vitrify Hanford tank waste as part of the River Protection Project (RPP). The research addresses safety concerns, process optimization, and waste form compliance. This program will provide technical data to ensure that the process functions as it was designed and minimizes costs.
Prompted by a $10 million Congressional allocation to identify supplemental actions to protect the Columbia River from groundwater contamination beneath the Hanford Reservation, the U. S. Department of Energy (DOE) Environmental Management (EM) Office of Clean-up Technology identified twenty-three potential technical projects and then down-selected ten of these for further evaluation. An independent expert peer review was conducted for the ten down-selected proposals. The review panel consisted of twenty-three recognized subject matter experts that broadly represented academia, industry, and federal laboratories. Of the initial ten proposals reviewed, one was given unconditional support, six were given conditional support, and three were not supported as proposed. Three additional proposals were then submitted by DOE for review--these proposals were structured, in part, to respond to the initial round of technical peer review comments. Peer reviews of these ...
This document describes the proposed strategy for disposal of spent and failed melters from the tank waste treatment plant to be built by the Office of River Protection at the Hanford site in Washington. It describes program management activities, disposal and transportation systems, leachate management, permitting, and safety authorization basis approvals needed to execute the strategy.
This document provides an inventory of Tank Farm equipment stored or abandoned aboveground and potentially subject to regulation. This inventory was conducted in part to ensure that Westinghouse Hanford Company (WHC) does not violate dangerous waste laws concerning storage of potentially contaminated equipment/debris that has been in contact with dangerous waste. The report identifies areas inventoried and provides photographs of equipment.
The Fast Flux Test Facility on the federal reservation at Hanford, Washington, has become a bright star in the universe of nuclear science and engineering technologies. The entire FFTF enterprise is now a success story, and this is particularly significant in these days when good news about nuclear power is scarce. The reactor, its testing capabilities and associated test facilities are described.
These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information.
Environmental monitoring has been conducted at the U.S. Department of Energy`s (DOE`s) Hanford Site in southeastern Washington State since 1945. Fish and wildlife have been monitored since 1945, however, a major emphasis on mammals did not occur until the 1970s. This report focuses on the 10-year period from 1983 through 1992. The objectives of this report are to evaluate {sup 90}Sr and {sup 137}Cs concentrations in Site wildlife populations and, when possible, evaluate trends in concentrations over this period of time. No distinct trends in radionuclide concentrations were apparent in most species sampled. Many measurements were at or below the analytical limit of detection. This evaluation found that concentrations of {sup 90}Sr in rabbit and deer bone were elevated in animals collected from areas adjacent to industrialized areas. Similarly, radionuclide concentrations in duck muscle from waterfowl collected at B Pond were elevated with {sup 137}Cs when compared ...
Over 360 distribution coefficients (KJ for cesium, iodine, selenium, Strontium, technetium, and uranium were measured in fiscal year 1998 using 20 sediments collected fkom borehole 299-El 7-21 on the Hanford Site as part of the Immobilized Low-Activity Waste-Performance Assessment (ILAW-PA). Additionally, the pH and cation-exchange capacity (a measure of the total quantity of cations that a sediment can adsorb) of these sediment samples were measured. The sediment samples originated from the Hanford formation (informal name). Statistical analyses, using Student's t-test and correlation were conducted with the measured values. There were no significant differences between layers 1 and 2 for the selenium, strontium, technetium, and uranium & values (statistics could not be applied to evaluate layer 3 &values). Significant differences between the cesium and iodine&values for layem 1 and 2 were observed. However, these ...
The Waste Sampling and Characterization Facility (WSCF) complex consists of the main structure (WSCF) and four support structures located in the 600 Area of the Hanford site east of the 200 West area and south of the Hanford Meterology Station. WSCF is to be used for low level sample analysis, less than 2 mRem. The Laboratory features state-of-the-art analytical and low level radiological counting equipment for gaseous, soil, and liquid sample analysis. In particular, this facility is to be used to perform Resource Conservation and Recovery Act (RCRA) of 1976 and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 sample analysis in accordance with U.S. Environmental Protection Agency Protocols, room air and stack monitoring sample analysis, waste water treatment process support, and contractor laboratory quality assurance checks. The samples to be analyzed contain very low concentrations of radioisotopes. The ...
Census and environmental surveillance information on waterfowl that use the Hanford Site 200 Area waste water ponds are described and evaluated. Physical features of the ponds are discussed in relation to their use and suitability for waterfowl. Seasonal distributions observed for the years 1971 through 1974 indicate that the highest use by waterfowl occurs during the spring and fall migratory periods. Base population estimates are 300 to 400 resident waterfowl with a few tens of pairs nesting during the summer. Environmental surveillance data on "1"3"7Cs in muscle tissue are presented for the years 1971 through 1977. Comparisons are made between Columbia River and waste water pond waterfowl, between waterfowl groups, and among ponds. Waterfowl collected from ponds frequently have easily detected levels of "1"3"7Cs in muscle tissue. However, those waterfowl collected from the Columbia River seldom show a "1"3"7Cs level above that expected from worldwide fallout. ...
This report presents the status of development of a three-dimensional conceptual model for the unconfined aquifer system at Hanford. A conceptual model is needed to support development of a realistic three-dimensional numerical model for predicting ground-water flow and the transport of contaminants. The report focuses on developing a hydrogeologic framework, assessing available hydraulic property data, describing flow-system boundaries, and evaluating areal recharge and leakage. Geologic descriptions of samples obtained during well drilling were used to prepare cross sections that correlate relatively continuous layers. The layers were defined based on textural differences that are expected to reflect differences in hydraulic properties. Assigning hydraulic properties to the layers is a critical part of the conceptual model. Available hydraulic property data for the study area were compiled and were correlated with the geologic layers where possible. Flow-system ...
This document defines analytical services the Waste Sampling and Characterization Facility (WSCF) shall provide the Environmental Compliance Program (ECP) throughout calendar year (CY) 2000. Two organizations within ECP are responsible for monitoring liquid and gaseous effluents and the environment immediately around facilities that contain or may contain radioactive and hazardous materials. Monitoring & Reporting (M&R), of Fluor Hanford Environmental Services, is responsible for effluent monitoring data, and Environmental Monitoring & Investigations (EMI), of Waste Management Technical Services, Inc., for near-facility environmental monitoring data. These organizations serve numerous projects, some of which are managed by other companies such as CH2M HILL and Bechtel Hanford, Inc. Monitoring data are collected and evaluated to determine their state of compliance with applicable federal and state regulations and permits, and ...
This document was requested by the Washington State Department of Ecology. Based on the State Underground Injection Control Program, as described in the Washington Administrative Code, French drains and reverse wells are being registered as Class V wells. Information on out-of-service French drains, out-of-service reverse wells, and out-of-service cribs that are deeper than their largest surface dimension is also provided. The data for this submittal were taken from the Waste Information Database System (WIDS) and the Hanford Environmental Compliance Record (HECR) database. The current definition used in WIDS for an ''inactive facility'' is one that either no longer receives waste or plans to in the future. The facilities listed in WIDS as inactive have all been listed as ''out-of-service.'' Information concerning the deactivation method for a facility is included when such information is ...
Five cycles of loading, elution, and regeneration were performed to remove technetium from a Hanford waste sample retrieved from Tank 241-AW-101 using SuperLig 639 resin. The waste sample was diluted to 4.95 M Na plus and then was processed to remove 137Cs through dual ion exchange columns each containing 15 mL of SuperLig 644. To remove 99Tc, the cesium decontaminated solution was processed downwards through two ion exchange columns, each containing 12 mL of SuperLig 639 resin. The columns, designated as lead and lag, each had an inside diameter of 1.45 cm and a height of 30 cm. The columns were loaded in series, but were eluted and then regenerated separately. The average technetium loading for the cycles was 250 BV at 10 percent breakthrough. There was no significant difference in the loading performances among the five cycles. The percent removal of 99Tc was greater than 99.94 percent and the average decontamination factor (DF) was approximately 1.7 x 103. ...
This hazard analysis (HA) has been prepared for the 300 Area N Reactor Fuel Fabrication and Storage Facility (Facility), in compliance with the requirements of Westinghouse Hanford Company (Westinghouse Hanford) controlled manual WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual, and to the direction of WHC-IP-0690, Safety Analysis and Regulation Desk Instructions, (WHC 1992). An HA identifies potentially hazardous conditions in a facility and the associated potential accident scenarios. Unlike the Facility hazard classification documented in WHC-SD-NR-HC-004, Hazard Classification for 300 Area N Reactor Fuel Fabrication and Storage Facility, (Huang 1993), which is based on unmitigated consequences, credit is taken in an HA for administrative controls or engineered safety features planned or in place. The HA is the foundation for the accident analysis. The significant event scenarios identified by this HA will be further evaluated in a ...
The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. Section 4.0 briefly ...
The underground storage tanks at the Hanford Complex contain mixed wastes generated over many years from plutonium production and recovery processes. The chemical changes of the organic materials used in the extraction processes and disposed to the tanks have a direct bearing on several specific safety issues, including potential energy releases from these tanks. This paper will give details of a study that is directed towards elucidating thermal and radiological decomposition mechanisms and products of the organic contents of the tanks. The study is being conducted in two parts. The first part, an aging study, will determine kinetics and products of the degradation of a simulated waste subjected to #gamma#-radiation from an external source. Although the simulant will not contain radioactive elements, it will contain other representative inorganic compounds and the primary organic compounds thought to have been disposed to the tanks. The second part of the ...
A schematic diagram shows the various processing steps to be performed during feed preparation in the Hanford Waste Vitrification Plant (HWVP). The pretreated NCAW is transferred to the slurry receipt adjustment tank (SRAT) in the HWVP for concentration. Water removed during boildown is collected in the slurry mix evaporator condensate tank (SMECT). After waste treatment the water is returned to the storage tanks for eventual disposal. The pretreated Neutralized Current Acid Waste (NCAW) is concentrated in the SRAT to approximately 125 g waste oxides/ liter. Formic acid is then added at a controlled rate to improve rheological properties and achieve a required reduction/oxidation state. Reflux boiling is initiated and continued for several hours. The concentrated slurry is cooled and pumped to the slurry mix evaporator (SME). In the SME, glass frit is added, and the slurry is further concentrated to achieve a nominal composition of 500 g total oxides/liter. This ...
A pretreatment flowsheet was tested for separating key radionuclide components from the sludge stored in one of the high level waste tanks (B-110) at the Hanford Site; this sludge resulted primarily from the bismuth phosphate process, which was one of the three major plutonium separation processes used at Handford. This test involved (1) washing with water, (2) caustic leaching, (3) acid dissolution, (4) separation of transuranic elements (TRUs) by extraction with octyl(phenyl)-N,N-diisobutylcarbamoylmethylphosphine oxide(CMPO), (5) separation of Sr by extraction with di-t-butylcyclohexano-18-crown-6, (6) separation of Cs from the acid-dissolved sludge solution by treatment with ammonium molybdophosphate (AMP), and (7) separation of Cs from the sludge wash and caustic leach solutions by ion exchange using a phenol-formaldehyde resin (CS-100). The results of the radionuclide separation steps indicated that the proposed flowsheet is a viable approach to pretreating ...
This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.
In October 1992, the US Department of Energy, Richland Field Office (RL) requested that Westinghouse Hanford Company (WHC) respond to a letter from EM-331 asking for completion of a survey of items in storage but not categorized as waste (Roberts 1992). The letter contained an attachment with instructions on how to fill out the attached form and what to exclude from the survey (Appendix A). This report is a summary of the information from the response issued to RL. This report primarily is for use in estimating future waste volumes that may have been overlooked because of the nature of their classification as material not categorized as waste (MNCAW) (i.e., not yet declared Waste).
This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 {open_quotes}Nuclear Facilities{close_quotes}. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP.
A novel device called the gas expansion model (GEM) is being developed at the Hanford Engineering Development Laboratory for testing in the 400-MW(th) fast flux test facility (FFTF) reactor. Incorporation of the GEM into liquid-metal reactor designs is intended to measurably contribute to the achievement of inherent safety, by allowing the reactor to passively shut down even in the extremely remote (hypothetical) event of an unprotected (no scram) loss-of-flow accident. The purpose of this paper is to describe the GEM and present predictive analyses of the effectiveness of the device during unprotected loss-of-flow experiments in the FFTF.
A novel device called the gas expansion model (GEM) is being developed at the Hanford Engineering Development Laboratory for testing in the 400-MW(th) fast flux test facility (FFTF) reactor. Incorporation of the GEM into liquid-metal reactor designs is intended to measurably contribute to the achievement of inherent safety, by allowing the reactor to passively shut down even in the extremely remote (hypothetical) event of an unprotected (no scram) loss-of-flow accident. The purpose of this paper is to describe the GEM and present predictive analyses of the effectiveness of the device during unprotected loss-of-flow experiments in the FFTF.
Wind tunnel tests were performed of three fugitive dust control agents derived from potato and sugar beet products. These materials are being considered for use as dust suppressants to reduce the potential for transport of radioactive materials by wind from radioactive waste construction and remediation sites. Soil and dust control agent type, solution concentrations, application quantities, aging (or drying) conditions, surface disturbance, and wind and saltating sand eolian erosive stresses were selected and controlled to simulate application and exposure of excavated soil surfaces in the field. A description of the tests, results, conclusions, and recommendations are presented in this report. The results of this study indicate that all three dust control agents can protect exposed soil surfaces from extreme eolian stresses. It is also clear that the interaction and performance of each agent with various soil types may differ dramatically. Thus, soils similar to that received from ML ...
Before low-level waste may be disposed of, a performance assessment must be written and then approved by the DOE (DOE 1988a DOE 1999a). The performance assessment is to determine whether ''reasonable assurance'' exists that the performance objectives of the disposal facility will be met. The DOE requirements for waste disposal (DOE 1988a DOE 1999a) require the protection of public health and safety; and the protection of the environment. Although quantitative limits are sometimes stated (for example, the all-pathways exposure limit is 25 mrem/year), usually the requirements are stated in a general nature. Quantitative limits were established by: investigating all potentially applicable regulations as well as interpretations of the review panels which DOE has established to review performance assessments, interacting with program management to establish the additional requirements of the program, and interacting with the public (i.e., the ...
A vendor glass formulation study was carried out at Pacific Northwest Laboratory (PNL), supporting the Phase I and Phase II melter vendor testing activities for Westinghouse Hanford Company. This study is built upon the LLW glass optimization effort that will be described in a separate report. For Phase I vendor melter testing, six glass formulations were developed at PNL and additional were developed by Phase I vendors. All the doses were characterized in terms of viscosity and chemical durability by the 7-day Product Consistency Test. Twelve Phase II glass formulations (see Tables 3.5 and 3.6) were developed to accommodate 2.5 wt% P{sub 2}O{sub 5} and 1.0 wt% S0{sub 3} without significant processing problems. These levels of P{sub 2}O{sub 5} and SO{sub 3} are expected to be the highest possible concentrations from Hanford Site LLW streams at 25 wt% waste loading in glass. The Phase H compositions formulated were 6 to 23 times more durable ...
The DEFENSE WASTE MANAGEMENT PROGRAM has been chartered by the Department of Energy (DOE) to receive, reduce, store, and maintain all radioactive defense waste generated by Hanford and received from offsite DOE contractors in a safe condition and in accordance with DOE and Westinghouse Hanford Company (WHC) standards. These activities are accomplished through the use of TRU retrievable storage sites, solid waste burial grounds, liquid waste storage tanks, capsule storage pools, and other low-level waste disposal methods. Continuous and/or periodic surveillance is maintained. Through the use of improved packaging methods, evaporator-crystallization and capsule production waste has been and continues to be put in a safe and economic storage condition pending future reprocessing or final disposition. For this Program Plan, the scope of Defense Waste Management programmatic activities has been organized into three general categories. A summary ...
Six safety initiatives have been identified for accelerating the resolution of waste tank safety issues and closure of unreviewed safety questions. Safety Initiative 5 is to reduce safety and environmental risk from tank leaks. Item d of Safety Initiative 5 is to complete corrosion studies of single-shell tanks to determine failure mechanisms and corrosion control options to minimize further degradation by June 1994. This report has been prepared to fulfill Safety Initiative 5, Item d. The corrosion mechanisms that apply to Hanford Site single-shell tanks are stress corrosion cracking, pitting/crevice corrosion, uniform corrosion, hydrogen embrittlement, and microbiologically influenced corrosion. The corrosion data relevant to the single-shell tanks dates back three decades, when results were obtained from in-situ corrosion coupons in a few single-shell tanks. Since that time there have been intertank transfers, evaporation, and chemical alterations of the waste. ...
Stretch-Out and Extended Low Power Operation is two particular operating modes applied for nuclear electricity generation. The relevant safety analysis and the impacts on plant operation are well illustrated, as well as some operation experiences earned in Daya Bay nuclear power station. The safety analysis and plant practice show that Stretch-Out operation and Extended Low Power Operation are operable in Daya Bay nuclear power station
Large quantities of organic chemicals used in reprocessing spent nuclear-fuels at the Hanford Site have accumulated in underground high-level radioactive waste tanks. The organic content of these tanks must he known so that the potential for hazardous reactions between organic components and sodium nitrate/nitrite salts in the waste can he evaluated. The solubilities of organic compounds described in this report will help determine if they are present in the solid phases (salt cake and sludges) as well as the liquid phase (interstitial liquor/supernate) in the tanks. The solubilities of five significant sodium salts of carboxylic acids and aminocarboxylic acids [sodium oxalate, formate, citrate, nitrilotriacetate (NTA) and ethylendiaminetetraacetate (EDTA)] were measured in a simulated supernate solution at 25 degrees C, 30 degrees C, 40 degrees C, and 50 degrees C.
The US Department of Energy (DOE) has millions of gallons of high level nuclear waste stored in underground tanks at Hanford, Washington and Savannah River, South Carolina. These tanks will eventually be emptied and decommissioned. This will leave a residue of sludge adhering to the interior tank surfaces that may contaminate groundwaters with radionuclides and RCRA metals. Experimentation on such sludges is both dangerous and prohibitively expensive so there is a great advantage to developing artificial sludges. The US DOE Environmental Management Science Program (EMSP) has funded a program to investigate the feasibility of developing such materials. The following text reports on the success of this program, and suggests that much of the radioisotope inventory left in a tank will not move out into the surrounding environment. Ultimately, such studies may play a significant role in developing safe and cost effective tank closure strategies.
Encapsulation of a unique isotopic blend of krypton and xenon gas employs a special application of laser technology. The encapsulated gas is then used as the primary medium for detection and identification of failed nuclear fuel rods. The use of gas tagging as a means of detecting and identifying failed nuclear fuel rods has been successfully demonstrated and used by the Argonne National Laboratory, Experimental Breeder Reactor (EBR-2) Project, and the Westinghouse Hanford Company (WHC), Fast Flux Test Facility (FFTF) Fast Breeder Reactor Program. The Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan has selected this leak detection system for use in their MONJU Prototype Reactor fuel assemblies. The MONJU reactor is almost identical in design to the highly successful FFTF reactor, which is currently in standby status.
A major new initiative to develop and irradiate a long-lived, mixed-oxide (MOX) fuel system in the Fast Flux Test Facility (FFTF) has been implemented by Westinghouse Hanford Company for the U.S. Department of Energy. The purpose of this new fuel system, called the core demonstration experiment (CDE), is to demonstrate the capability of achieving a 3-yr life in a prototypical, heterogeneous reactor environment under prototypical power and temperature conditions. Ten fuel and six blanket CDEs are establishing the performance characteristics of entire fuel assemblies of wire-wrapped, large-diameter, annular-pellet, advanced MOX fuel pins with the tempered martensitic HT-9 alloy cladding and end caps, HT-9 wire wrap, and an HT-9 duct in a heterogeneous array with the blanket assemblies. The CDE performance characteristics are confirming the basis for design, fabrication, and irradiation of the CDE.
A major initiative to develop and irradiate a long-life, mixed-oxide fuel system in the Fast Flux Test Facility (FFTF) has been implemented by Westinghouse Hanford Company for the US Department of Energy. The FFTF, shown in Figures 1 and 2, is a 400 megawatt thermal, fast liquid metal reactor that tests liquid metal, space and fusion fuels and materials. The new fuel system, called the Core Demonstration Experiment (CDE) demonstrates the capability of achieving a three- to four-year life in a prototypic heterogeneous reactor environment under prototypic power and temperature conditions. This fuel system will greatly increase fuel performance and lifetime from the current standard FFTF driver fuel. New design features, fabrication development, CDE assembly fabrication, and irradiation status have been described.
This case study is an application, to a nuclear power plant, of the methodology for quantifying environmental costs and benefits, contained in the regional energy plan, adopted in April, 1983, by the Northwest Power Planning Council, pursuant to Public Law 96-501.The study is based on plant number 2 of the Washington Public Power Supply System (WNP-2), currently nearing completion on the Hanford Nuclear Reservation in eastern Washington State. This report describes and documents efforts to quantify and estimate monetary values for the following seven areas of environmental effects: radiation/health effects, socioeconomic/infrastructure effects, consumptive use of water, psychological/health effects (fear/stress), waste management, nuclear power plant accidents, and decommissioning costs. 103 references.
Radioactively contaminated acidic aqueous wastes and organic liquids were discharged to the soil column at three disposal sites within the 200 West Area of the Hanford Site, Washington. As a result, a portion of the underlying groundwater is contaminated with carbon tetrachloride several orders of magnitude above the maximum contaminant level accepted for a drinking water supply. Treatability testing and cleanup actions have been initiated to remove the contamination from both the unsaturated soils to minimize further groundwater contamination and the groundwater itself. To expedite cleanup, innovative technologies for (1) drilling, (2) site characterization, (3) monitoring, (4) well field development, and (5) contaminant treatment are being demonstrated and subsequently used where possible to improve the rates and cost savings associated with the removal of carbon tetrachloride from the soils and groundwater.
The UNSAT-H model was developed at Pacific Northwest National Laboratory (PNNL) to assess the water dynamics of arid sites and, in particular, estimate recharge fluxes for scenarios pertinent to waste disposal facilities. During the last 4 years, the UNSAT-H model received support from the Immobilized Waste Program (IWP) of the Hanford Site's River Protection Project. This program is designing and assessing the performance of on-site disposal facilities to receive radioactive wastes that are currently stored in single- and double-shell tanks at the Hanford Site (LMHC 1999). The IWP is interested in estimates of recharge rates for current conditions and long-term scenarios involving the vadose zone disposal of tank wastes. Simulation modeling with UNSAT-H is one of the methods being used to provide those estimates (e.g., Rockhold et al. 1995; Fayer et al. 1999). To achieve the above goals for assessing water dynamics and estimating ...
The 177 underground storage tanks at the DOE's Hanford Site contain an estimated 180 million tons of high-level radioactive wastes. It is desirable to remove and concentrate the highly radioactive fraction of the tank wastes for vitrification. Resorcinol-formaldehyde (R-F) resin, an organic ion-exchange resin with high selectivity and capacity for the cesium ion, which is a candidate ion-exchange material for use in remediation of tank wastes. The report includes information on the structure/function analysis of R-F resin and the synthetic factors that affect performance of the resin. CS-100, a commercially available phenol-formaldehyde (P-F) resin, and currently the baseline ion-exchanger for removal of cesium ion at Hanford, is compared with the R-F resin. The primary structural unit of the R-F resin was determined to consist of a 1,2,3,4-tetrasubstituted resorcinol ring unit while CS-100, was composed mainly of a 1,2,4-trisubstituted ring. ...
This report is an overview of current spent nuclear fuel management in the DOE complex. Sources of information include published literature, internal DOE documents, interviews with site personnel, and information provided by individual sites. Much of the specific information on facilities and fuels was provided by the DOE sites in response to the questionnaire for data for spent fuels and facilities data bases. This information is as accurate as is currently available, but is subject to revision pending results of further data calls. Spent fuel is broadly classified into three categories: (a) production fuels, (b) special fuels, and (c) naval fuels. Production fuels, comprising about 80% of the total inventory, are those used at Hanford and Savannah River to produce nuclear materials for defense. Special fuels are those used in a wide variety of research, development, and testing activities. Special fuels include fuel from DOE and commercial reactors used in ...
Potential maximum radiation dose rates over a 1,000-year time horizon were calculated for exposure to the decontaminated concrete removed from the 183-H Solar Evaporation Basins at the Hanford Site, Richland, Washington. The RESRAD computer code, Version 5.62, which implements the methodology described in the US Department of Energy`s manual for developing residual radioactive material guidelines, was used in this evaluation. Currently, the concrete is not being used. Four potential exposure scenarios were developed for the land area where the decontaminated concrete will be stored. In Scenario A industrial use of the land is assumed; in Scenario B recreational use of the land is assumed; in Scenario C residential use of the land is assumed; and in Scenario D (a plausible but unlikely land-use scenario), the presence of a subsistence farmer in the immediate vicinity of the land is assumed. For Scenarios A and B, water used for drinking is assumed to be surface ...
This report to the Nuclear Regulatory Commission (NRC) describes the development and application of a methodology to systematically and quantitatively assess predictive uncertainty in groundwater flow and transport modeling that considers the combined impact of hydrogeologic uncertainties associated with the conceptual-mathematical basis of a model, model parameters, and the scenario to which the model is applied. The methodology is based on a n extension of a Maximum Likelihood implementation of Bayesian Model Averaging. Model uncertainty is represented by postulating a discrete set of alternative conceptual models for a site with associated prior model probabilities that reflect a belief about the relative plausibility of each model based on its apparent consistency with available knowledge and data. Posterior model probabilities are computed and parameter uncertainty is estimated by calibrating each model to observed system behavior; prior parameter estimates are optionally ...
This is a presentation on Human Factors in reactor operations. It discusses issues that deal with power plant operations, training and design, operational effectiveness and safety, supporting people to achieve effective and error free performance.
Special Operations Forces (SOF) within a Joint Task Force are controlled by a Joint Special Operations Task Force (JSOTF). Presently, JSOTF headquarters are formed around the core of the Theater Special Operations Command (TSOC), a service SOF headquarter...
The US Department of Energy (DOE) has millions of gallons of high level nuclear waste stored in underground tanks at Hanford, Washington and Savannah River, South Carolina. These tanks will eventually be emptied and decommissioned. This will leave a residue of sludge adhering to the interior tank surfaces that may contaminate nearby groundwaters with radionuclides and RCRA metals. Performance assessment (PA) calculations must be carried out prior to closing the tanks. This requires developing radionuclide release models from the sludges so that the PA calculations can be based on credible source terms. These efforts continued to be hindered by uncertainties regarding the actual nature of the tank contents and the distribution of radionuclides among the various phases. In particular, it is of vital importance to know what radionuclides are associated with solid sludge components. Experimentation on actual tank sludges can be difficult, dangerous and prohibitively ...
The NATO Advanced Research Workshop on Nuclear Submarine Decommissioning and Related Problems was held in Moscow June 19--22, 1995. It was preceded by a visit to the Zvezdotchka Shipyard at Severodvinsk, a repair and maintenance yard for Russian nuclear submarines, for a subgroup of the workshop attendees. Most of the material in this paper is drawn directly form the workshop proceedings. Slightly less than 500 nuclear ships and submarines (the vast majority are submarines) have been constructed by the countries with nuclear navies. This includes approximately 250 by Russia, 195 by the United States, 23 by the United Kingdom, 11 by France and 6 by China. By the year 2000 it is expected that approximately one-half of these nuclear vessels will be removed from service and in various states of decommissioning. A newspaper account in June 1997 indicated that 156 Russian nuclear submarines had been removed from service. In August 1996 it was reported that 55 reactor compartment sections ...
Commercially available melter technologies were tested during 1994-95 as part of a multiphase program to test candidate technologies for vitrification of the low-level waste (LLW) stream to be derived from retrieval and pretreatment of Hanford Site tank wastes. Seven vendors were selected for Phase 1 testing to demonstrate vitrification of a high sodium content liquid LLW simulant. The tested melter technologies included four Joule-heated melters, a carbon electrode melter, a combustion melter, and a plasma melter. Various dry and slurry melter feed preparation processes were also tested. Various feed material samples, product glass samples, and process offgas streams were characterized to provide data for evaluation of process decontamination factors and material mass balances for each vitrification technology. This report describes the melter mass balance evaluations and results for six of the Phase 1 LLW melter vendor demonstration tests.
FIU-HCET participated in an ICT meeting at Mound during the second week of December and presented a brief videotape of the testing of the Robotic Climber technology. During this meeting, FIU-HCET proposed the TechXtract technology for possible testing at Mound and agreed to develop a five-page proposal for review by team members. FIU-HCET provided assistance to Bartlett Inc. and General Lasertronics Corporation in developing a proposal for a Program Opportunity Notice (PON). The proposal was submitted by these companies on January 5, 1999. The search for new equipment dismantlement technologies is continuing. The following vendors have responded to requests for demonstration: LUMONICS, Laser Solutions technology; CRYO-BEAM, Cryogenic cutting technology; Waterjet Technology Association, Waterjet Cutting technology; and DIAJET, Waterjet Cutting technology. Based on the tasks done in FY98, FIU-HCET is working closely with Numatec Hanford Corporation (NHC) and Pacific ...
Waste Management Area U (WMA U) includes the U Tank Farm, is currently regulated under RCRA interim-status regulations, and is scheduled for closure probably post-2030. Groundwater monitoring has been under an evaluation program that compared general contaminant indicator parameters from downgradient wells to background values established from upgradient wells. One of the indicator parameters, specific conductance, exceeded its background value in one downgradient well triggering a change from detection monitoring to a groundwater quality assessment program. The objective of the first phase of this assessment program is to determine whether the increased concentrations of nitrate and chromium in groundwater are from WMA U or from an upgradient source. Based on the results of the first determination, if WMA U is not the source of contamination, then the site will revert to detection monitoring. If WMA U is the source, then a second part of the groundwater quality assessment plan will be ...
Grout has been evaluated as a means of containing low-level radioactive waste for long-term disposal. Concerns about hydrogen and reactive gas generation in the Hanford Site grout disposal facility lead to the development of the G3 model, which has predicted buildup of radiolytically formed gases in the grout region and their migration to air-filled regions. The G3 model is a one-dimensional code that couples models of gas diffusion with two-phase gas and liquid flow. It was coupled to a compartment diffusion model and these models predicted the concentrations of hydrogen I nitrous oxide, and other gases in air-filled regions of the grout disposal facility. The results have served as the technical basis for safety studies. A unique finding of the G3 model was that a liquid return, or expulsion of unbound liquid from the grout region, could occur. This liquid return is driven by displacement caused by gas bubbles that form within the grout`s microstructure. Liquid ...
The 105-KE and 105-KW Fuel Storage Basins were constructed more than 35 years ago as repositories for irradiated fuel from the K East and K West Reactors. Currently, the basins contain irradiated fuel from the N Reactor. To continue to use the basins as desired, seismic adequacy in accordance with current US Department of Energy facility requirements must be demonstrated. The 105-KE and 105-KW Basins are reinforced concrete, belowground reservoirs with a 16-ft water depth. The entire water retention boundary, which currently includes a portion of the adjacent reactor buildings, must be qualified for the Hanford Site design basis earthquake. The reactor building interface joints are sealed against leakage with rubber water stops. Demonstration of the seismic adequacy of these interface joints was initially identified as a key issue in the seismic qualification effort. The issue of water leakage through seismicly induced cracks was also investigated. This issue, ...
The FFTF Standby Plan, Revision 0, provides changes to the major elements and project baselines to maintain the FFTF plant in a standby condition and to continue washing sodium from irradiated reactor fuel. The Plan is consistent with the Memorandum of Decision approved by the Secretary of Energy on January 17, 1997, which directed that FFTF be maintained in a standby condition to permit the Department to make a decision on whether the facility should play a future role in the Department of Energy`s dual track tritium production strategy. This decision would be made in parallel with the intended December 1998 decision on the selection of the primary, long- term source of tritium. This also allows the Department to review the economic and technical feasibility of using the FFTF to produce isotopes for the medical community. Formal direction has been received from DOE-RL and Fluor 2020 Daniel Hanford to implement the FFTF standby decision. The objective of the Plan ...
In this report, we have examined some of the fundamental mechanisms expected to be at work during mobilization of the waste within the double-shell tanks at Hanford. The motivation stems from the idea that in order to properly apply correlations derived from scaled tests, one would have to ensure that appropriate scaling laws are utilized. Further, in the process of delineating the controlling mechanisms during mobilization, the currently used computational codes are being validated and strengthened based on these findings. Experiments were performed at 1/50-scale, different from what had been performed in the previous fiscal years (i.e., 1/12- and 1/25-scale). It was anticipated that if the current empirical correlations are to work, they should be scale invariant. The current results showed that linear scaling between the 1/25-scale and 1/50-scale correlations do not work well. Several mechanisms were examined in the scaled tests which might have contributed to ...
The electrometallurgical treatment process described in this paper builds on our experience in treating spent fuel from the Experimental Breeder Reactor (EBR-II). The work is also to some degree, a spin-off from applying electrometallurgical treatment to spent fuel from the Hanford single pass reactors (SPRs) and fuel and flush salt from the Molten Salt Reactor Experiment (MSRE) in treating EBR-II fuel, we recover the actinides from a uranium-zirconium fuel by electrorefining the uranium out of the chopped fuel. With SPR fuel, uranium is electrorefined out of the aluminum cladding. Both of these processes are conducted in a LiCl-KCl molten-salt electrolyte. In the case of the MSRE, which used a fluoride salt-based fuel, uranium in this salt is recovered through a series of electrochemical reductions. Recovering high-purity uranium from an aluminum-matrix fuel is more challenging than treating SPR or EBR-II fuel because the aluminum- matrix fuel is typically -90% ...
Pre-waste-emplacement groundwater travel time is one indicator of the isolation capability of the geologic system surrounding a repository. Two distinct modeling approaches exist for prediction of groundwater flow paths and travel times from the repository location to the designated accessible environment boundary. These two approaches are: (1) the deterministic approach which calculates a single value prediction of groundwater travel time based on average values for input parameters and (2) the stochastic approach which yields a distribution of possible groundwater travel times as a function of the nature and magnitude of uncertainties in the model inputs. The purposes of this report are to (1) document the theoretical (i.e., mathematical) basis used to calculate groundwater pathlines and travel times in a basalt system, (2) outline limitations and ranges of applicability of the deterministic modeling approach, and (3) explain the motivation for the use of the stochastic modeling ...
This report describes the work performed during FY 1995 by Pacific Northwest Laboratory in developing and optimizing analysis techniques for identifying organics present in Hanford waste tanks. The main focus was to provide a means for rapidly obtaining the most useful information concerning the organics present in tank waste, with minimal sample handling and with minimal waste generation. One major focus has been to optimize analytical methods for organic speciation. Select methods, such as atmospheric pressure chemical ionization mass spectrometry and matrix-assisted laser desorption/ionization mass spectrometry, were developed to increase the speciation capabilities, while minimizing sample handling. A capillary electrophoresis method was developed to improve separation capabilities while minimizing additional waste generation. In addition, considerable emphasis has been placed on developing a rapid screening tool, based on Raman and infrared spectroscopy, for ...
This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance Implementation Plan provides the interface requirements and ...
... CJCSI 3141.01C, Responsibilities for the Management and ... of a multivolume set of CJCS unclassified and ... (1) CJCSM 3122.01A, Joint Operation ...
... in the Vicinity of Terminal Areas," Ph. ... WORDS Operations Research Stochastic processes Mathematical ... theory Aut',matic control Queueing theory ...
... directed the transformation of designated Service operational headquarters into effective and scalable Joint Task Force headquarters capable of ...
The behavior of melter feed (a mixture of nuclear waste and glass-forming additives) during waste-glass processing has a significant impact on the rate of the vitrification process. We studied the effects of silica particle size and sucrose addition on the volumetric expansion (foaming) of a high-alumina feed and the rate of dissolution of silica particles in feed samples heated at 5 C/min up to 1200 C. The initial size of quartz particles in feed ranged from 5 to 195 {micro}m. The fraction of the sucrose added ranged from 0 to 0.20 g per g glass. Extensive foaming occurred only in feeds with 5-{micro}m quartz particles; particles {ge}150 {micro}m formed clusters. Particles of 5 {micro}m completely dissolved by 900 C whereas particles {ge}150 {micro}m did not fully dissolve even when the temperature reached 1200 C. Sucrose addition had virtually zero impact on both foaming and the dissolution of silica particles. Over 100 sites in the United States are currently tasked with the storage ...
A semi-automatic system which considers operation in a face by monitoring technological parameters of an extraction vehicle and a longwall conveyor is examined. The system records in tabular form the location, progress made, operating and down time of an extraction vehicle and operating and down time of the conveyor. A description of the operating principle system and systems for arrangement of the remote sensing and central recording device are presented. (Note: extraction vehicle not identified: LTN)
This book contains the proceedings of the International Topical Meeting on Remote Systems and Robotics in Hostile Environments. It is organized under the following sessions: Worldwide Applications Overview; Operating Mobile Systems; Sensors and Control Systems; Space Applications; Reactor Operations and Surveillance; Remote Equipment for Hazardous Operations; Future Mobile System; Mining and Construction Operations; Special Applications; Hot Cell Applications; Processing; Reactor Operations and Maintenance; Decontamination and Waste Handling; Remote Handling Development and Demonstration.
A procedure was developed to monitor boundaries within which secondary mining operations can be applied. Principal techniques include instrument and operative-remote observations of earth shifts and aerial photography of displacements on the surface of the trough.
The CWDD injector has been shipped to Argonne National Laboratory, installed, and recommissioned. Commissioning progress, operational status, and future plans are reported. Operational experience at ANL is compared with that obtained at Culham.
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning mi...
The connection between W-algebras and the algebra of differential operators is conjectured. The bosonized representation of the differential operator algebra with c=-2n and all the subalgebras are examined. The degenerate representations and null-state classifications for c=-2 are presented. (orig.).
The 17-metre DOE/Sandia VAWT began operation in March 1977. Since that time the turbine has been operated strictly by manual control for the purpose of data acquisition and performance analysis; this procedure has limited the VAWT operation time and power...
... 2010-10-01 false Training specific to locomotive engineers and other operating personnel. 236.1047 ...Control Systems § 236.1047 Training specific to locomotive engineers and other operating personnel. (a)...
The product-operator formalism is the most commonly used tool for describing and designing multidimensional NMR experiments. In spite of its relative simplicity and sound theoretical underpinnings,...Full Text Available
Prokaryotic genomes can be annotated based on their structural, operational, and functional properties. These annotations provide the pivotal scaffold for understanding cellular functions on a genome-scale,...Full Text Available
Securing the co-operation of persons supplying information required for medical statistics is essentially a problem in human relations, and an understanding of the motivations, attitudes, and behaviour...Full Text Available
This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)
This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)
Task, Psychomotor Vigilance Test (PVT) Transition to Operations ... Related Tasks (36). Task, Psychomotor Vigilance Test (PVT) on ISS. Common Item(s) ...
Data on French nuclear electricity generation sites, nuclear power plant operations personnel, operation simulators, nuclear training centers and training statistics are presented.
In this paper information about monograph construction is provided and some sample nomographs constructed by the author are included to encourage the use of these tools in operational health physics applications.
... less humans have to do to operate a robot. ... Robots can help human operators with the increase ... important mission outlined by the UUV master plan. ...
The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF.
The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF.
Chapter 10 of the manual that describes on-the-ground operations that strengthen the likelihood that our forests will be healthier, more diverse, and ... ...
The rate of battery use is sometimes even higher in military operations. During Operation Iraqi Freedom, the Marines used more than 3000 single-use ...
... five newly created airborne divisions, 82nd, 101st, 11th ... completed large scale airborne operations in ... Although division-sized airborne operations ...
...QUALIFICATION AND CERTIFICATION OF LOCOMOTIVE ENGINEERS Implementation of the Certification...operations and certifies locomotive engineers from a different railroad...designated supervisor of locomotive engineers or a certified train...
performs Gaussian pyramid operation on an image performs expand pyramid operation on an image mosaic two images using 'reduce' and 'expand' pyramid ...
Here the authors try to dissolve some commonly held misconceptions about the operation of eddy current probes used for inspecting heat exchanger tubes. With the help of computer model results, the authors demonstrate that, for optimized operation, absolute/differential probes should be operated with coil current flowing in phase with another. This month's feature should be of interest to researchers as well as for NDT field personnel.
On the basis of legally provided area dose measurements and time records of fluoroscopic examinations during the operation, radiation doses to medical personnel and patients are evaluated. Adequate radiation protection measures and a careful behaviour in the operating room keep the radiation exposure to the personnel below the maximum permissible exposure. Taking into account the continuous personnel radiation monitoring and medical supervision, radiation hazards in the operating room can be considered low.
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning missions. Careful logistical and operational planning can optimize the health, performance, and readiness of the working dog while protecting the safety and well-being of the team members working with them. We also offer recommendations for medical treatment of dog bites. PMID:19813342
... multivibrators and amplifiers arranged to operate as described above. ... The first of the multivibrators is triggered by the trailing edge of the ...
Purpose: To ensure continuous operation for condensate desalters with the control device for desalter group in a nuclear power plant by automatically averaging the operation interval between each of the desalters. Constitution: Electroconduction meters are provided at the inlet and the outlet for each of the desalters. The conduction rates at the inlet and outlet are compared to determine the re-generation timing of the condensate desalter. Limiting set value for each of the equipments in the cleanup systems is changed by using a mathematical operation circuit to average the operation interval between each of the desalters. (Ikeda, J.).
... harassment, incidental to construction and operation of an offshore liquefied natural gas (LNG) facility. Under the Marine Mammal Protection ... ...
The Ringold Formation consists of lacustrine and fluvial deposits overlying the Columbia River Basalt. The Ringold Formation, because of its thickness, extent, and age, is an excellent unit in which to detect and possibly data the deformation that has occurred since deposition of the basalt. One objective of this study was to investigate the paleomagnetism of the upper Ringold unit exposed at one location in the White Bluffs in enough detail to resolve, with reasonable confidence, the magnetostratigraphy of the rock units sampled. The other objective was to evaluate, in a preliminary manner, the paleomagnetic favorability and magnetostratigraphy of the subsurface Ringold Formation in the Pasco Basin and at selected exposures outside the Pasco Basin. The scope of this study was the collection of 300 paleomagnetic samples, their measurement, and analysis. Samples were collected from the White Bluffs, from core recovered from six drill holes on the Hanford Site, and ...
The dominant shrubs were sagebrush and spiny hopsage; the herbs were dominated by cheatgrass and Sandberg bluegrass. Spiny hopsage appeared to be vulnerable to burning and also to damage by off-road vehicular traffic. It appears to have little or no ability to reproduce through seedlings; once the existing plants are killed they are not likely to be replaced, even if seed-producing plants are nearby. The only pure stand of spiny hopsage known to exist on the Hanford Site is on and near study plot 2H. Sagebrush, like spiny hopsage, is killed by burning and by heavy vehicles. Sagebrush is capable of reproducing via seeds, indicating that it is an inherently aggressive species with a capacity to reestablish itself if parent plants are in the vicinity to act as seed sources. Alien, annual plants, especially cheatgrass, were a major contributor to the herbaceous canopy cover in plots 3S, 4S, and 5S. However, native perennial grasses, especially Sandberg bluegrass, were ...
This report was prepared in response to a request from the Nuclear Energy Research Advisory Committee (NERAC) subcommittee on ''Long-Term Isotope Research and Production Plans.'' The NERAC subcommittee has asked for a reply to a number of questions regarding (1) ''How well does the Department of Energy (DOE) infrastructure sme the need for commercial and medical isotopes?'' and (2) ''What should be the long-term role of the federal government in providing commercial and medical isotopes?' Our report addresses the questions raised by the NERAC subcommittee, and especially the 10 issues that were raised under the first of the above questions (see Appendix). These issues are related to the isotope products offered by the DOE Isotope Production Sites, the capabilities and condition of the facilities used to produce these products, the management of the isotope production programs at DOE ...
Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and ...
This report describes the results of a program conducted at the Pacific Northwest Laboratory (PNL) and Westinghouse Hanford Company (WHC) to identify alternative methods to measure the surface level in the waste tanks. This program examined commercially available devices for measuring the distance to a target. This is a continuation of a program started in FY93. In the first test sequence, tests were performed.on five devices to determine their applicability to measure the surface level in the waste tanks. The devices were the Enraf-Nonius{trademark} Model 872 Radar Gauge, the Enraf-Nonius{trademark} Model 854 Advanced Technology Gauge (ATG), the Stanley Tool Laser Measuring Device, the Robertshaw Inven-Tel{reg_sign} Precision Level Gauge, and the Micro Switch Model 942 Acoustic Sensor. In addition, discussions were held with several manufacturer representatives regarding other potential devices. The results of these tests were documented in a previous report. Two ...
The proposed action is to recycle slightly activated copper that is currently stored in a warehouse leased by Lawrence Berkeley Laboratory (LBL) to a scrap metal dealer. Subsequent reutilization of the copper would be unrestricted. This document addresses the potential environmental effects of recycling and reutilizing the activated copper. In addition, the potential environmental effects of possible future uses by the dealer are addressed. Direct environmental effects from the proposed action are assessed, such as air emissions from reprocessing the activated copper, as well as indirect beneficial effects, such as averting air emissions that would result from mining and smelting an equivalent quantity of copper ore. Evaluation of the human health impacts of the proposed action focuses on the pertinent issues of radiological doses and protection of workers and the public. Five alternatives to the proposed action are considered, and their associated potential impacts are addressed. The ...
Developing and deploying innovative environmental cleanup technologies is an important goal for the U.S. Department of Energy (DOE), which faces challenging remediation problems at contaminated sites throughout the United States. Achieving meaningful, constructive stakeholder involvement in cleanup programs, with the aim of ultimate acceptance of remediation decisions, is critical to meeting those challenges. DOE`s Office of Technology Development sponsors research and demonstration of new technologies, including, in the past, the Volatile Organic Compounds Arid Site Integrated Demonstration (VOC-Arid ID), hosted at the Hanford Site in Washington State. The purpose of the VOC-Arid ID has been to develop and demonstrate new technologies for remediating carbon tetrachloride and other VOC contamination in soils and ground water. In October 1994 the VOC-Arid ID became a part of the Contaminant Plume Containment and Remediation Focus Area (Plume Focus Area). The VOC ...
This report presents highlights of activities in the Acceleartor Technology (AT) Division from April through December 1978. The report is divided into 10 sections to cover work done by the four groups that make up AT Division (AT-1, AT-2, AT-3, and AT-4). Section I is a brief summary of the whole report. Sections II through VI describe work done by At-1, the Linac Technology Group. Subjects covered are the Pion Generation for Medical Irradiation Program, the Electronuclear Fuel-Producing Accelerator Program, the Gyrocon rf Amplifier Program, the Electron Linear Accelerator Program, and the Free Electron Laser Program. Section VII covers the Linear Accelerator Beam Dynamics development, and Sec. VIII deals with work with the H/sup -/ Ion Source. Most of the work in Secs. VII and VIII was done by AT-2, the Special Projects Group, although work on factors influencing emittance growth was done by MP-9, and results on emittance growth in the new European Council for Nuclear Research (CERN) ...
The spectrum of training aids used in the nuclear industry runs the gamut from the very basic (i.e., valve training aids - gate, globe, check) to the highly complex (i.e., nuclear full scope simulator). Designing and purchasing the best training aids take much time, detailed investigation, and good understanding of plant operations. The training aid that has given the New York Power Authority the best results has been the motor operator valve (MOV) trainer. Some of the items that make the MOV trainer a good choice are: (1) large number of MOVs in the plant, (2) importance of MOVs to safe plant operation, (3) detailed MOV procedures used by the plant, (4) history of MOV problems, and (5) ability to demonstrate important concepts and operation - hammer blow effect, torque and limit switch adjustment and functions, and actual sequence of operation of the limitorque valve ...
Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a ...
Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a ...
Development of a front end system for a high energy proton accelerator is in progress at Korea Atomic Energy Research Institute (KAERI) for basic science and industrial applications. The proper vacuum components has been installed and operated successfully between ion source and RFQ. The reliable operation of the accelerator has been completed at vacuum system in the high and ultra high vacuum range under operating conditions. Proper control system for the vacuum instruments, based on PC operated by Windows, has been designed and constructed by control group at PAL. As PC operated by windows with inherent instability does not proper, embedded system can be replaced for reliable operation system, such as VME system operated by vxWorks.
This paper presents a new approach for solving multistage decision problems in power system operation by using a new fuzzy dynamic programming technique. To investigate its validity, the hydrothermal scheduling problem is used as an example problem. Within this problem, uncertainty elements exist such as load demand and natural hydraulic inflows to reservoirs exist which can be expressed by fuzzy numbers. Two new fuzzy decision making techniques for selecting the optimal operating states at each stage are introduced. Further, the hydrothermal scheduling solution obtained had an operating band defined by upper and lower bounds. To further enhance the information that this operating band provides, a midpoint operation technique that applies both forward and backward fuzzy DP is also introduced. This allows the system operator to consider current ...
In connection with some applications of asymptotic numbers and asymptotic functions, proposed by Khr.Khristov, the problem of describing subsets of asymptotic numbers closed with respect to algebraic operations arises. The algebraic operations with asymptotic numbers are defined by classes of their representatives. All trivial or noncharacteristic solutions are avoided. A procedure for constructing sets of elements closed under action of an algebraic operation or a combination of two or more of them is given. It turns out that the closed sets are given by their kernels, the last being the minimal subsets which generate the whole set by the introduced algebraic operations. It is proved that such kernels exist always. . The closed sets are described by their correspondence with the kernels. (S.P.).
This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.
The tet repressor regulated expression of the Tn-10-encoded tetracycline resistance determinant in a tetracycline-dependent manner. In the absence of tetracycline, the tet repressor binds as a dimer to the 19-base-pair palindromic tet operator sequence. Amino acid homologies and genetic studies with trans-dominant mutants suggest that sequence-specific recognition of the tet operator involves the extensively studied helix-turn-helix motif. We have used the uracil-DNA glycosylase (UDG) footprinting systems to identify thymine contacts in the tet operator that are essential for the formation of tet repressor-operator complexes.
This report contains the operation procedures in extreme situations and lessons learned from blackouts, based on a mandate given by the Operations Committee. Nordic TSOs have had common rules and principles for system operation i.e. System Operation Agreement since the late 1990s. The rules have been revised according to the system security and market changes and needs. The collaboration between system operators is regular and fruitful. The knowledge and capability to manage extreme situations of the Nordic power system has continuously increased and the recent blackouts did not show major deficiencies in operation practices. Regardless of the existing good collaboration it is important to continue development in the future in order to ensure high system security. Important development areas are security of reserve supervision and coordination of calculation ...
This paper describes the Fast Flux Test Facility (FFTF) Operations initial training program utilizing the Operator Training Simulator (OTS). The OTS is a computer-driven system that provides real time response of essential FFTF plant functions to a control room mockup. The FFTF, a 400 Megawatt, three-loop, sodium-cooled fast test reactor will test fuels, materials and equipment for the U.S. Liquid Metal Fast Breeder Reactor Program. Construction is expected to be completed in August 1978. Initial criticality is expected in early 1979. This schedule will require FFTF control room operators to be fully qualified to operate the facility by late 1979. Because FFTF is like no other U.S. nuclear reactor, existing U.S. utility plants could not be depended on to provide highly experienced people to operate FFTF. Therefore, an Operator Training Simulator has been built. ...
Performance of electric vehicles (EVs) is being studied in an ongoing Site Operator Program, as part of the Electric and Hybrid Vehicle Program supported by the U.S. Department of Energy (DOE). More than 200 EVs are being operated by Site Operators in various geographical and climatic regions of the United States. Cold-weather operation of EVs is of particular interest. As expected, low temperatures affect a battery`s ability to accept a charge, which decreases EV range and increases operating costs. Battery types other than lead-acid are being evaluated such as nickel-iron, gelled electrolyte lead-acid, nickel-cadmium, and sodium-sulfur. Also, improved methods of collecting EV performance data are being implemented, thermal management systems are being tested, and a prototype ultracapacitor is being tested as a possible alternative to conventional batteries.
The purpose of this paper is to relate some of the commonly encountered problems with operational procedures in the nuclear industry and offer practical suggestions for their elimination. The paper is based on recent consultant experience in assisting industry clients with human performance related design and assessment initiatives. Operational procedures are a key part of an integrated system design. Procedures provide the specified instructions for actions people are to undertake in operating a facility to achieve production and safety goals. While organizations continue to make substantial investments in procedure development and maintenance, problems with procedures continue to occur, as evidenced through operating inefficiencies, errors, and events. The paper reviews the role procedures play in facility operations, comments on current development and maintenance practices, ...
This report presents the results of a study on Operation and Maintenance (O M) practices in hydroelectric pumped storage plants. The objective of this project, which was sponsored by EPRI, is to record the practical knowledge on the O M of a number of the domestic and foreign pumped storage plants which has been accumulated by their operating staff. Civil, geotechnical, mechanical and electrical aspects of O M of the thirty-five plants visited are discussed, and some general conclusions, as warranted by the commonality of the problems, are drawn. These conclusions may be useful to the planners and designers of future pumped storage projects. In general, due to their layout, diversity and different modes of operation, the plants have few common problems which, in most cases, are limited to the mechanical and electrical aspects of the plants' operation. The data on plants' ...
A compression ignition engine was operated on dual fuel principle inducting two commercial fuels and four pure hydrocarbon fuels in turn through intake manifold along with air and injecting diesel fuel to initiate the combustion in the conventional manner. The engine was operated at different loads and at each load the quantity of inducted fuel was increased gradually till knocking set in. The engine performance and exhaust pollutant emissions were recorded at different operating conditions. It was observed that the extent of induction and the effect on the performance depend on the properties of the inducted fuel such as volatility, self ignition temperature and oxidation characteristics. The energy release during the cycle was also observed to shift depending on the properties of inducted fuel. With the dual fuel operation, the thermal efficiency at part loads was observed to be less compared to neat ...
This invention pertains to a light weight underground pipe or cable installing device adapted for use in a narrow and deep operating trench. More particularly this underground pipe installing device employs a pair of laterally movable gates positioned adjacent the bottom of the operating trench where the earth is more solid to securely clamp the device in the operating trench to enable it to withstand the forces exerted as the actuating rod is forced through the earth from the so-called operating trench to the target trench. To accommodate the laterally movable gates positioned adjacent the bottom of the narrow pipe installing device, a pair of top operated double-acting rod clamping jaws, operated by a hydraulic cylinder positioned above the actuating rod are employed.
The introduction of numerical control (NC) machine tools has made it possible to automate machining in series and small series production. The organization of automated production sections merged NC machine tools with automated transport systems. However, both the one and the other require the presence of an operative at the machine for low skilled operations. Industrial robots perform a number of auxiliary operations, such as equipment loading-unloading and control, changing cutting and auxiliary tools, controlling workpieces and parts, and cleaning of location surfaces. When used with a group of equipment they perform transfer operations between the machine tools. Industrial robots eliminate the need for workers to form auxiliary operations. This underscores the importance of developing robotized manufacturing centers providing for minimal human participation in production and ...
Synthetic oligoribonucleotides have been used to probe the interaction of MS2 coat protein with the translational operator of the MS2 replicase gene. We have investigated the possible formation of a...Full Text Available
Sixty-five patients operated with total pancreatectomy were reviewed with respect to factors influencing operative mortality and morbidity, long-term survival, and metabolic sequelae. The diagnoses...Full Text Available
Background:The US military is currently involved in large, lengthy, and complex combat operations around the world. Effective military operations require optimal health of deployed...Full Text Available
Separate groups of rats received 500 trials of lever-press training under autoshaping (food delivery followed 10-second lever presentations, or occurred immediately following a response); operant conditioning...Full Text Available
To assess the merits of currently available treatment options in the management of patients with low rectal cancer, a review of the medical literature pertaining to the operative and non-operative management...Full Text Available
This study assesses the contribution of smoking to all-cause mortality among a primarily minority cohort of urban transit operators. Survey and medical exam data, obtained from 1,785 workers (61% African...Full Text Available
The objective of this study was to assess the feasibility for propane as an automotive fuel in Manitoba, by comparing the overall performance and operating costs of a test fleet operating on propane with that of a control fleet operating on unleaded gasoline. The performance of gasoline and propane was compared by using two specific tests: general driveability and relative fleet fuel consumption were determined by driver surveys and gross fuel use data from normal urban and rural vehicle operation. Specific fuel consumption was determined by controlled chassis dynamometer tests on a series of selected vehicles utilizing representative driving cycles. Fleet drivers operating propane fueled vehicles were satisfied with vehicle operation and reported similar vehicle performance with either gasoline or propane. Although there was no significant difference in ...
Objectives:Cachexia is common in pancreatic cancer and may have an influence on longterm survival but few studies have investigated this in patients with operable tumours. Therefore,...Full Text Available
IntroductionPatients undergoing selective minor emergency and elective procedures are followed up by a nurse-led structured telephone review six weeks post-operatively in our hospital....Full Text Available
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development ...
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development ...
This article presents an overview of the IAEA's technical co-operation activities in the field of nuclear raw materials, particularly looking at recent developments and trends influencing future directions
A historical prospective mortality study was conducted on a cohort of 34 156 male members of a heavy construction equipment operators union with potential exposure to diesel exhaust emissions. This...Full Text Available
Despite allowing for the unprecedented visualization of brain functional activity, modern neurobiological techniques have not yet been able to provide satisfactory answers to important questions about...Full Text Available
This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).
The lifetime of technical constructions is determined by many factors. Technical, operational and technological aspects all help to define the term 'lifetime'. Examples from practical operation of steam turbines are considered for a discussion of 'lifetime', and methods of analysis are described. (TK/AK).
1 to the operator of a waste collective system by an agreement or contract. The conditions for the ...Fees of the waste collective system are subject to the supervision of the authority responsible for market surveillance. ...The operator of waste collection system collects wastes from producers and holder and transports these to a collection
ObjectiveTo investigate possible differences in operative delivery rate among low-risk women, randomised to an alongside midwifery-led unit or to standard obstetric units within...Full Text Available
The influence of geometry and operating conditions of the centrifugal compressor stage on the radial gas force is determined on the basis of the theoretical method and calculation program using experimental boundary conditions.
The patent relates to fluid operated devices for moving articles. The machine may be used in filling a nuclear fuel canister with fuel pellets where there is a tendency for out of squareness of pellets to produce a jam condition readily cleared by a modest force. (U.K.).
This monograph explores an alternative way of providing a JSOTF headquarters to the Joint Force Commander. Beginning with a history of joint SOF doctrine, the monograph outlines the evolution of special operations command and control and the subsequent ne...
This Military Working Dog (MWD) was shot in the chest during combat operations in Iraq. Military Working Dogs are critical to the safety and well- being of deployed troops in combat operations and, as such, they are triaged and treated in our combat hospi...
The rate of survival for infants with intact giant exomphatos has much improved during the last 20 years; this is partly due to better respiratory and nutritional support. The use of a staged operative...Full Text Available
The supersymmetry in quantum mechanics and shape invariance condition are applied as an algebraic method to solving the Dirac-Coulomb problem. The ground state and the excited states are investigated via new generalized ladder operators. (author)
The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3.
Energy requirements and exergy inefficiencies for processing of malt drink were estimated for a Nigerian brewery. The process was divided into twenty-one basic unit operations and grouped into four main group operations: silo house, brew house, filter room and packaging house. The energy intensity for processing a batch of 9.8 tonnes brew grains to 562 hl of malt drink was estimated as 261.63 MJ/hl consisting of electrical (41.01%), thermal (58.81%) and manual (0.19%) of the total energy. The most energy intensive group operation was the Packaging House operation, followed by the Brew House operation with energy intensities of 223.19 and 35.94 MJ/hl, respectively. The exergy analysis revealed that the packaging house operation was responsible for most of the inefficiency (92.16%) followed by brew house operation (7.17%) and the silo house ...
The report, generated by a computerized data base system, presents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems, operational domestic particle scrubbers, and Japanese coal-fired utility FGD installations. It ...
Cyberspace and its associated operations present both opportunities and challenges for military and United States Government decision-makers and planners. The Pentagon has formally recognized cyberspace as a domain of warfare. Cyberspace is man-made, dyna...
In case of operating both Wolsung Nuclear Units 1 and 2 without operating tritium removal facilities, it is estimated that tritium in 2013 would be accumulated up to about 30 million Ci that would result in about 2,300 man-rem of tritium exposure to opera...
We report a case of a female patient who was operated at the third relapse of an atrial myxoma caused by Carney complex. The difficult operation was performed without any complications despite extensive...Full Text Available
On February 27, 1990, standards for Benzene were promulgated for benzene transfer and benzene waste operations. The benzene enabling document summarizes these standards. The basic purpose of the document is to assist the EPA regional enforcement personnel...
The relation between the timing of prophylactic antibiotic administration and the occurrence of bacteraemia during transurethral operations was studied in 112 patients whose urine was infected before...Full Text Available
The Secure Automated Fabrication (SAF) line, an automated and remotely controlled manufacturing process, is scheduled for startup in 1987 and will produce mixed uranium/plutonium oxide fuel pins for the Fast Flux Test Facility (FFTF). The application of robotics in the fuel fabrication and supporting operations is described.
The Wind2H2 system is fully functional and continues to gather performance data. In this report, specifications of the Wind2H2 equipment (electrolyzers, compressor, hydrogen storage tanks, and the hydrogen fueled generator) are summarized. System operational experience and lessons learned are discussed. Valuable operational experience is shared through running, testing, daily operations, and troubleshooting the Wind2H2 system and equipment errors are being logged to help evaluate the reliability of the system.
An overall view of the 1982 plant operating performance is presented. All periods of ON-FEED operation, UNSCHEDULED SHUTDOWNS, and SCHEDULED SHUTDOWNS are accounted for and tabulated. Causes of UNSCHEDULED SHUTDOWNS are identified and discussed. Plant solutions aimed at reducing the effect of similar future shutdowns or preventing recurrence of such shutdowns are explained. Details of repeated, major maintenance problems with various pieces of equipment are presented. Discussion of each problem and solutions found during 1982 are given, where applicable.
Radioisotope facilities were operated to support research, development and production of radioisotopes. Irradiation facilities were operated to offer irradiation service to the clients. Even though intensive periodical checks and some essential maintenance had been carried out the results of RI facility maintenance seemed to be not much satisfactory due mainly to the shortage of skilled manpower and maintenance expenses. High intensity {gamma} irradiator was normally operated 426 times for overall 3,440 hrs, and the low intensity {gamma} irradiator was operated 157 times for overall 11,092 hrs, respectively. (author)
... mounted new operations against the TTP stronghold in ... was the fourth tranche of Pakistan's IMF-backed ... and brought the total funds received by ...
Thermodynamic Stable Metal Compositions for Improvement of an Operational Safety of Constructional Materials under Conditions of Multifactor Loadings of an Aggressive Environment
This report presents the operating results for Run 255 at the Advanced Coal Liquefaction Research and Development Facility in Wilsonville, Alabama. This run operated in the Close Coupled Integrated Two-Stage Liquefaction mode (CC-ITSL) using Martin Lake Texas lignite. The purpose of this run was to demonstrate unit and system operability with Martin Lake lignite. Run 255 began on 20 March 1988 and continued through 9 June 1988. During this period, 204.4 MF tons of Martin Lake Texas lignite were fed in 1865.5 hours of operation. 70 figs., 21 tabs.
... values and unless special precautions and equipment are used, it would be very difficult to service and maintain operational jet-fuel systems with ...
... of the utility of the terminal outcomes, ... Other stochastic topics, such as random walks, branching ... find special uses, particularly in queueing theory ...
A report is given on the development and operational experience in steam turbines in an annual review. The author refers to an extensive bibliography on this subject. (TK/LH).
This paper deals with the indications for prostatectomy; the differential diagnosis of the symptomatology of bladder neck obstruction; and the factors influencing the choice of operation....Full Text Available
This report illustrates how, thanks to the development of a new algorithm for the probabilistic evaluation in a given period (e.g. one week) of the operating costs and risk indices (reliability) of a generation system with energy-constrained units, it has been possible to significantly improve the WAT program, used for many years by ENEL for generation expansion planning studies. In particular, it describes how the annual simulation of the system operation is accomplished, so as to calculate the mean expected values of the yearly operating costs (fuel) and the risk indices, at the same time optimizing the use of hydro resources and pumped-storage plants. (author).
This workshop covered the latest practical engineering and operational management applications and techniques that have been found to enhance operational costs, reliability, and flexibility, with topics such as establishing the optimal refrigeration design cycle and operating design points; utility management; manpower scheduling; plant control philosophy and automation; short and long term maintenance scheduling; refrigerant loss detection and control; system contamination; component reliability; and equipment technical performance issues.
... operation, experimental data reduction, and application of PES results to studies related to estuarine and coastal sediment transport problems are ...
Developed is a simple method alloing one to determine the k-loop coefficient of #beta# function in gauge theories provided the operator expansion is constructed in (k-1) loop for certain two-point functions. The calculation of the two-loop coefficient of the Gell-Mann-Low function becomes trival - it reduces to a few algebraic operations with expressions which are already known. As an example spinor, scalar and supersymmetric electrodynamics are considered. Although the corresponding results for #beta#"("2") are known in the literature, both the method of the calculations and some points referring to the construction of the operator expansion are novel.
Spline functions associated with a general linear differential operator L which interpolate prescribed data with respect to arbitrary linear functionals are investigated. (Author)
Sep 16, 2010 ... Taking military operations as an example, there is evidence that stress-related behavioral disorders and mental conditions such as anxiety, ...
As a generalization of fuzzy set, hesitant fuzzy set is a very useful tool in situations where there are some difficulties in determining the membership of an element to a set caused by a doubt between a few different values. The aim of this paper is to develop a series of aggregation operators for hesitant fuzzy information. We first discuss the relationship between intutionistic fuzzy set and hesitant fuzzy set, based on which we develop some operations and aggregation operators for hesitant fuzzy elements. The correlations among the aggregation operators are further discussed. Finally, we give their application in solving decision making problems.
This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department.
In order to achieve the safe core cooling during normal operation and upset conditions, HANARO adopted an upward forced convection cooling system with dual containment arrangements instead of the forced downward flow system popularly used in the majority of forced convection cooling research reactors. This kind of upward flow system was selected by comparing the relative merits of upward and downward flow systems from various points of view such as safety, performance, maintenance. However, several operational matters which were not regarded as serious at design come out during operation. In this paper are presented the design and operational experiences on the unique cooling features of HANARO. (author)
This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf.
This study examines the effects of blasting on waste dumps at open pit mining operations. Of specific concern were mining operations at the base of a five hundred foot high waste dump such as the operation at the South Pit of the Smoky-River Coal Ltd. property near Grande Cache, Alberta. An assessment of waste dump stability including factors such as quasi-static deformation behaviour, historical dump deformation behaviours and potential blasting effects was undertaken. It is concluded that safe blasting may be carried out in proximity to waste dumps, but monitoring of dump behaviour is recommended to ensure operational safety. 22 refs., 4 apps.
In this paper we describe the reconstruction strategies, the calibration procedures and the detector performance results from the latest CMS operation.
Original pictures installed in the 1st and 2nd generation type central control panels (CCP) and new 'Awarable and Complex' pictures were made on personal computers and evaluated. A total 18 of actual plant operators (M=32.3, SD=10.5 years old) participated in the evaluation. The operators rated the new CRT pictures highly. The response times using the new CRT pictures were shorter than those by the original pictures. Both results suggested that the CRT picture design guidelines based on the operators' plant images were effective for improving their performance. (author)
The 17-metre DOE/Sandia VAWT began operation in March 1977. Since that time the turbine has been operated strictly by manual control for the purpose of data acquisition and performance analysis; this procedure has limited the VAWT operation time and power output. An automatic-control system has been designed and implemented to study automatic control of a VAWT and to better judge the fatigue life and reliability of the VAWT under what will be normal operating conditions for power production. This system, including the necessary hardware, is discussed in detail along with a simplified cost analysis.
Information is presented concerning reactor research activities; isotope geology; NERC radiocarbon laboratory; teaching activities; and reactor operation.
Aluminum electrolytic capacitors have a long history of reliable operation in unattended field sites. However, their use in the expected space applications ...
An operator of FE-closure is introduced on the set of functions of a multivalued logic based on the systems of functional equations. It is proved that, for every k ? 2, the FE-closure operator generates a finite classification on the set P k of functions of k-valued logic. The least class in this classification is shown to be the class H k of all homogeneous functions. Also a series of corollaries are obtained concerning the finite FE-generating sets in the FE-closed classes.
An explicite PN solution of the multi-dimensional homogeneous neutron transport equation is given by expanding the angular flux into a series of geometry-independent spherical harmonics operators. An algorithm is developed for representing the spherical harmonic operators in orthogonal curvilinear coordinates. The general formulae are applied to two-dimensional spherical geometry; detailed P3 formulae are given. (orig.).
This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste ...
A quadruply redundant synchronous fault tolerant processor (FTP) is now under fabrication at the C.S. Draper Laboratory to be used initially as a trip monitor for the Experimental Breeder Reactor EBR-II operated by the Argonne National Laboratory in Idaho Falls, Idaho. The real time operating system for this processor is described.
We investigate the q-deformation of the BRST algebra, the algebra of the ghost, matter and gauge fields on one spacetime point using the result of the bicovariant differential calculus. There are two nilpotent operations in the algebra, the BRST transformation #delta#_B and the derivative d. We show that one can define the covariant commutation relations among the fields and their derivatives consistently with these two operations as well as the *-operation, the antimultiplicative inner involution. (orig.).
Apppendix B of 10 CFR Part 50 establishes quality assurance requirements for the operation of nuclear power plant safety-related structures, systems and components. This Guide describes an acceptable method for complying with these regulations with regard to overall quality assurance program requirements for the operation phase of nuclear power plants. Input to this Guide has been provided by the Advisory Committee on Reactor Safeguards.
The general requirements applicable to the quality assurance of the Finnish nuclear power plants are presented in the Council of State Decision (395/91) and in the guide YVL 1.4. This guide specifies the quality assurance requirements to be applied during the operation of the nuclear power plants as well as of the other nuclear facilities. Quality assurance applies to all the activities and organizations with a bearing on the safe operation of the nuclear power plants. (5 refs.).
The performance of a commercial heat pipe was investigated both experimentally and theoretically. The effect of the temperature difference, the surface area ratio, and the operational conditions on the performance were studied. The heat flow rate and the vapor temperature were estimated on a ready-made commercial heat pipe. Its performance varied considerably with operational conditions. Theoretical consideration of a mathematical model and several nomographs are also presented. This work is applicable to the design and use of heat pipes in the field.
In January 1981, a dual-fuel engine of type 8L52/55 ADG, with the highest cylinder rating of all four-stroke gas engines currently available, succesfully completed its test run on M.A.N.s test bed at Augsburg. The engine can be operated either on Diesel oil or on gas and pilot oil and can be switched from Diesel to gas operation or vice versa at any load during operation. In gas operation, the engine works on the pilot injection principle. By changing from pulse-pressure to constant-pressure turbocharging, matching the charge-air pressure, improving mixture formation and optimising the injection system, M.A.N. has succeeded in achieving a high power output while reducing the heat consumption in gas operation almost to its level in Diesel operation. A close look is taken at the design features which distinguish the dual-fuel engine from the 52/55 A Diesel engine, ...
One of the main goals in the operation of a cupola furnace is to keep the molten iron properties within prescribed bounds while maintaining the most economical operation for the cupola. In this paper the authors present a procedure to obtain the nominal values for the manipulated process variables. The nominal values are calculated by solving a constrained nonlinear programming optimization problem. Two different optimization problems are discussed and examples for using the procedure are presented.
For the first time a segmented n-type HPGe detector was operated directly submerged in liquid nitrogen over a long period. As this kind of detector is envisioned to be used in GERDA phase II, it was operated with a low mass signal cable with snap-contacts and mounted in a low-mass copper holder. The detector performance was stable over 146 days, indicating that neither detector nor contacts deteriorated.
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development of future radiological safety plans by presenting detailed discussion of the problems and solutions arising during Operation Castle.
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development of future radiological safety plans by presenting detailed discussion of the problems and solutions arising during Operation Castle. Included is a discussion of fallout forecasting techniques.
The authors propose an integrated indicator of pump-rod couplings that allows both the couplings and the pump operations to be appraised according to the given formula. (Formula provided). The dynamic relationships of rod operations were determined with nomographs. These relationships involve such factors as: the type and size of the sucker-rod string; the pressure load at the equalizer head and its correlation to threshold pressure at pump discharge; pump diameter; the rod weight and construction; and integral reliability indicators.
This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings.
The gamma scanning system which is installed in IMEF is the equipment obtaining the gamma ray spectrum from irradiated fuels. This equipment could afford the useful data relating spent fuels like as burn-up measurements. We describe the specifications of the equipment and its accessories, and also described its operation procedure so that an operator can use this report as the operation procedure. (author). 1 tab., 11 figs., 11 refs.
The aim of the paper is to define and study algebraic operations closely related to the group structure on the homotopy groups of topological spaces. These are certain many-place operations on the homotopy groups. The family of these operations induces an algebraic structure on the homotopy groups, which is called an A?-group structure by analogy with the A?-structures introduced by Stasheff.
The theory of reliability is used to develop statistical field data on malfunctions of units of sucker rod well pumps (UShSN). The indices of reliability of the UShSN are applied for establishment of the cause-effect links between the operating factors. Dependences of operating time on the depth of suspension of the pumps, mode of pumping out, degree of flooding of the oil, and twisting of the shafts are established for conditions of specific fields. The obtained relationships can be used in selecting and optimizing the work of the UShSN.
Results are presented from analyzing indicators for efficient operation of the fleet of production equipment under conditions of the ''Tsentral'naya'' mine of the production association ''Krasnoarmeyskugol'.'' Measures are presented which make it possible to increase the operating efficiency with minimum adjusted outlays.
The Doublet III device is operating with an extensive system of plasma limiters and wall protective armor. Operations with up to 8MW of neutral beam power and 1.5MA plasma current are planned. Design and operational performance of the following systems are discussed: 1. Water-cooled graphite moveable limiter. 2. Water-cooled graphite fixed limiter and neutral beam wall armor. 3. Radiatively cooled Inconel divertor plates.
Dimensional metrology and positioning operations are used in many fields of particle accelerator projects. This lecture gives the basic tools to designers in the field of measure by analysing the spatial layout of measurement systems since it is central to dimensional metrology as well as positioning operations. In a second part, a case study dedicated to a synchrotron storage ring is proposed from the detection of the magnetic centre of quadrupoles to the orbit definition of the ring.
The present code requirements on quality assurance as well as the present praxice of quality assurance procedures in the operation of nuclear power plants are presented. On the example of recurring inspections the organizational and technical complications are shown with respect to the code and licensing requirements. Taking the present experiences into account suggestions are given how to transform the general requirements of KTA 1401 to quality assurance requirements during plant operation. (orig.).
Specifications of the PGV-1000 steam generators applied at the WWER-1000 NPP power units, operational experience and data on damages at the 'cold' heat carriers of steam generators are considered and their results are presented. Developed and introduced measures aimed at improving reliability and operational life of the PGV-1000 collectors are described.
Argus Energy's Kiah Creek Operation has received the 2007 Wetlands West Virginia Award presented by the West Virginian Coal Association. The operation was originally a 1267 acre underground mine in the Coalburg seam. Underground mining commenced in 2000 until the end of 2003 with more than two million tons of coal being produced. The creation of the wetlands was achieved during the operations. 8 photos.
Ways of improving the water chemistry used in the turbine generator stator?s cooling systems at Russian nuclear power plants are considered. Data obtained from operational chemical monitoring of indicators characterizing the quality of cooling water in the turbine generator stator cooling systems of operating power units at nuclear power plants are presented.
...take on my Notice of Intent to Conduct Geothermal Resource Exploration Operations? ...INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Exploration Operations...take on my Notice of Intent to Conduct Geothermal Resource Exploration Operations?...
A new class of (not necessarily bounded) operators related to (mainly infinite) directed trees is introduced and investigated. Operators in question are to be considered as a generalization of classical weighted shifts, on the one hand, and of weighted adjacency operators, on the other; they are called weighted shifts on directed trees. The basic properties of such operators, including closedness, adjoints, polar decomposition and moduli are studied. Circularity and the Fredholmness of weighted shifts on directed trees are discussed. The relationships between domains of a weighted shift on a directed tree and its adjoint are described. Hyponormality, cohyponormality, subnormality and complete hyperexpansivity of such operators are entirely characterized in terms of their weights. Related questions that arose during the study of the topic are solved as well. Particular trees with one ...
Due to deregulation, the electrical power industry is undergoing deep changes, moving towards an open market. Two kinds of parties are active in the new environment: the economical agents (producers, consumers, brokers) and the power system operator, the former interested in power exchanges and their economic value, the latter in bus injections and their threat to the security of the transmission network. The variables used to model the transmission network operation have to be meaningful to the power system operator as well as to the economical parties; the action rules followed by the power system operator to enforce network security have to be carefully designed to be equitable and non-discriminatory. In this paper, a modeling of the power exchanges is proposed in the form of multilateral trades, and some rules for the action of the power system operator are proposed and ...
A Real-Time Operating System(RTOS) is an Operating System(OS) intended for real-time applications. Benchmarking is a point of reference by which something can be measured. The QNX is a Real Time Operating System(RTOS) developed by QSSL(QNX Software Systems Ltd.) in Canada. The ELMSYS is the brand name of commercially available Personal Computer(PC) for applications such as Cabinet Operator Module(COM) of Digital Plant Protection System(DPPS) and COM of Digital Engineered Safety Features Actuation System(DESFAS). The ELMSYS PC Hardware is being qualified by KTL(Korea Testing Lab.) for use as a Cabinet Operator Module(COM). The QNX RTOS is being dedicated by Korea Atomic Energy Research Institute (KAERI). This paper describes the outline and benchmarking test results on Context Switching, Message Passing, Synchronization and Deadline Violation of QNX RTOS under the ELMSYS PC platform
The Fast Flux Test Facility has been in operation for approximately five years, including about one thousand days of full power operation of the Fast Test Reactor. During that time the collective dose equivalents received by operating personnel have been about two orders of magnitude lower than those typically received at commercial light water reactors. No major contamination problems have been encountered in operating and maintaining the plant, and release of radioactive gas to the environment has been minimal and well below acceptable limits. All shields have performed satisfactorily. Experience to date indicates an apparent radiological superiority of liquid metal reactor systems over current light water plants.
The Lie algebra so(2n+1) and the Lie superalgebra osp(1/2n) are quantized in terms of 3n generators, called preoscillator generators. Apart from n "Cartan" elements the preoscillator generators are deformed para-Fermi operators in the case of so(2n+1) and deformed para-Bose operators in the case of osp(1/2n). The corresponding deformed universal enveloping algebras U_q[so(2n+1)] and U_q[osp(1/2n)] are the same as those defined in terms of Chevalley operators. The name "preoscillator" is to indicate that in a certain representation these operators reduce to the known deformed Fermi and Bose operators.
Optimum plant operation can often be achieved by means of constraint control instead of model- based on-line optimization. This is because optimum operation is seldom at the top of the hill but usually at the intersection of constraints. This article describes the development of a constraint control system for a plant producing ethylbenzene (EB) by the Mobil/Badger Ethylbenzene Process. Plant optimization can be defined as the maximization of a profit function describing the economics of the plant. This function contains terms with product values, feedstock prices and operational costs. Maximization of the profit function can be obtained by varying relevant degrees of freedom in the plant, such as a column operating pressure or a reactor temperature. These degrees of freedom can be varied within the available operating margins of the plant.
This report consists of appendices A-F containing the biological data which were collected from Lake Roosevelt, Washington. The data are to be used in the design of a computer model that would predict biological responses of reservoir operations as part of the System Operation Review program. Major components of the model included: Quantification of impacts to phytoplankton, zooplanktons, benthic invertebrates, and fish caused by reservoir drawdowns and low water retention times; quantification of number, distribution, and use of fish food organisms in the reservoir by season; determination of seasonal growth of fish species as related to reservoir operations, prey abundance and utilization; and quantification of entrainment levels of zooplankton and fish as related to reservoir operations and water retention times.
This report is a scoping study to examine research opportunities to improve the accuracy of the system dynamic load and generator models, data and performance assessment tools used by CAISO operations engineers and planning engineers, as well as those used by their counterparts at the California utilities, to establish safe operating margins. Model-based simulations are commonly used to assess the impact of credible contingencies in order to determine system operating limits (path ratings, etc.) to ensure compliance with NERC and WECC reliability requirements. Improved models and a better understanding of the impact of uncertainties in these models will increase the reliability of grid operations by allowing operators to more accurately study system voltage problems and the dynamic stability response of the system to disturbances.
Nuclear generation operators are facing a challenging business environment at the beginning of the new millennium. Evolving changes in business context, competitive commercial pressures, and changes in technology have dictated recurring evaluation of operational practices and the adequacy of supporting tools, and the pursuit of opportunities for operational improvement. A key area of utility operations that has been impacted by these changes is the nuclear plant control centre. Changes to workspace layout, equipment provisions, staffing, and work organization are examples of some of the adjustments being introduced to improve operational and safety effectiveness. This paper discusses some of the key factors influencing these changes and identifies additional design principles for CANDU control centres that will enable new control centre designs and retrofits of existing control ...
The Power Systems Development Facility (PSDF) is a joint Department of Energy/Industry sponsored engineering-scale facility for testing advanced coal-based power generation technologies. High temperature, high pressure gas cleaning is critical to many of these advanced technologies. Barrier filter elements that can operate continuously for nearly 9000 hours are required for a successful gas cleaning system for use in commercial power generation. Since late 1999, the Kellogg Brown & Root Transport reactor at the PSDF has been operated in gasification mode. This paper describes the test results for filter elements operating in the Siemens-Westinghouse particle collection device (PCD) with the Transport reactor in gasification mode. Operating conditions in the PCD have varied during gasification operation as described elsewhere in these proceedings (Martin et al, 2002).
Conditions for the construction of polynomial eigen-operators for the Hamiltonian of collective string field theories are explored. Such eigen-operators arise for only one monomial potential v(x)=#mu#x"2 in the collective field theory. They form a w_#infinity#-algebra isomorphic to the algebra of vertex operators in 2d gravity. Polynomial potentials of orders only strictly larger or smaller than 2 have no non-zero-energy polynomial eigen-operators. This analysis leads us to consider a particular potential #nu#(x)=#mu#x"2+g/x"2. A Lie algebra of polynomial eigen-operators is then constructed for this potential. It is a symmetric 2-index Lie algebra, also represented as a subalgebra of U(sl(2)). (orig.).
Background There is some evidence that a patient?s pre-operative condition influences short-term and long-term post-operative outcomes. The aim of the present study is to compare the physiological and operative severity score for the enumeration of mortality and morbidity (POSSUM) and modified Glasgow prognostic score (mGPS) models in the prediction of post-operative outcome, both short term and long term, in patients undergoing resection of oesophago-gastric cancer. Patients and Methods Patients who underwent curative resection for oesophago-gastric cancer from January 2005 to May 2009 and who had data to score the POSSUM, P-POSSUM, O-POSSUM and mGPS models were included in the study. Observed morbidity and mortality rates were compared with predicted outcome in different risk groups. Bot...
To estimate the success criteria of an operator's action time for a probabilistic safety/risk assessment (PSA/PRA) of a nuclear power plant, the information from a safety analysis report (SAR) and/or that by using a simplified simulation code such as the MAAP code has been used in a conventional PSA. However, the information from these is often too conservative to perform a realistic PSA for a risk-informed application. To reduce the undue conservatism, the use of a best-estimate thermal hydraulic code has become an essential issue in the latest PSA and it is now recognized as a suitable tool. In the same context, the 'ASME PRA standard' also recommends the use of a best-estimate code to improve the quality of a PSA. In Korea, a platform to use a best-estimate thermal hydraulic code called the MARS code has been developed for the PSA of the Korea standard nuclear power plant (KSNP). This study has proposed an estimation method for an operator's ...
To estimate the success criteria of an operator's action time for a probabilistic safety/risk assessment (PSA/PRA) of a nuclear power plant, the information from a safety analysis report (SAR) and/or that by using a simplified simulation code such as the MAAP code has been used in a conventional PSA. However, the information from these is often too conservative to perform a realistic PSA for a risk-informed application. To reduce the undue conservatism, the use of a best-estimate thermal hydraulic code has become an essential issue in the latest PSA and it is now recognized as a suitable tool. In the same context, the 'ASME PRA standard' also recommends the use of a best-estimate code to improve the quality of a PSA. In Korea, a platform to use a best-estimate thermal hydraulic code called the MARS code has been developed for the PSA of the Korea standard nuclear power plant (KSNP). This study has proposed an estimation method for an ...
The fuel-injection system of the Niigata 6L 16X-AG dual-fuel engine is structured to steadily supply injected fuel during diesel-engine operation, and to distribute oil at a low rate to all the cylinders during gas-engine operation. The dual-fuel engine is started by the diesel engine operation and is changed over to gas-engine operation when the load increases. This change over is done automatically with a link mechanism. Regarding the gas-supply system, the changing pressure of supply gas is controlled by a pressure control valve which is stable and most adequate for the engine. The dual-fuel engine has the following features: (1) a high compression ratio is adopted, which reduces fuel consumption and thermal efficiently; (2) if the supply of gas decreases or stops, while continuing loaded operations, it can immediately shift to diesel engine operation ...
In supervising CANDU plant operation, Operations staff must routinely monitor plant status using information from several information systems. One key source of plant status information are the CRT displays at console workstations and panel locations. At Darlington, as at most CANDU plants, Operations staff have adopted a reference set of displays for use in monitoring during Full Power Steady State conditions. The display set employed was chosen from the available suite of displays, and operational experience has demonstrated that the current displays could be improved. For Outages, no reference display set has been defined, and for Upset conditions, the current Transient display set does not provide the information needed by operations staff, and consequently is not used. This paper describes the basis for and findings from a COG project [1] undertaken in 1997 to characterize ...
The K Reactor at the Savannah River Site (SRS) shut-down in spring 1988 for maintenance and safety upgrades. Since that time the receiving stream for thermal effluent, Indian Grave Branch and Pen Branch, have undergone a pattern of post-thermal recovery that is typical of other SRS streams following removal of thermal stress. Divesity of fish and aquatic macroinvertebrate communities has increased and available habitats have been colonized by numerous species of herbaceous and woody plants. K Reactor is scheduled to resume operation in 1991 and operate through 1992 without a cooling tower to cool the discharge. It is likely that the reactor will operate at approximately one-third to one-half of full power (800--1200 MW thermal) during this period and effluent temperatures will be substantially lower than earlier operation at full power. Monthly average discharge temperatures at half-power ...
In abnormal conditions, the operator's ability to deal with a large volume of data, and initiate the most appropriate remedial action is a fundamental concern in the design of energy control centers. Once a severe disruption has occurred in the power network, a series of tasks are required before the operator can make any decisions. Many of these functions involve computational efforts, and require a long period of processing time. The application of a wrong set of information by the operator may result in a catastrophic recovery situation. Also, as the system becomes larger, the required time for these tasks grows significantly and the operator may have very little time to analyze the contingency and issue a proper decision. These facts have led to the conclusion that a computer driven decision making mechanism will help the operator perform duties with minimum flaws and ...
The world's fleet of nuclear power plants is, on average, more than 20 years old. Even though the design life of a nuclear power plant is typically 30-40 years, it is quite feasible that many plants will be able to operate in excess of their design lives, provided that nuclear power plant engineers demonstrate by analysis, trending, equipment and system upgrades, increased vigilance, testing and ageing management that the plant will operate safely. In the operation of nuclear power plants, safety should be always the prime consideration. Plant operators and regulators must always ensure that plant safety is maintained, and where possible enhanced, during a plant's operating lifetime. Nuclear power plant life management (PLiM) has gained increased attention over the past decade, and effective ageing management of systems, structures and components (SSCs) is a key element in PLiM for ...
Tarapur Atomic Power Station Unit-3 and 4 (TAPS -3 and 4) are the 540 MWe reactors. Unit-4 attained first criticality on 06th March 2005 and operated for about 230 effective full power days (EFPD). Unit-3 attained first criticality on 21st May 2006 and operated for about 20 EFPD. With the reactor operation radiation field increases on the Primary Heat Transport system equipments, Moderator system equipments and auxiliary system equipments due to deposition of fission products and activation products in different reactor systems. These dose rates significantly contributes to the external exposure and stations collective dose during reactor operation, refueling operation and maintenance activities. A study was undertaken at TAPS 3 and 4 to identify the system equipments showing the significant dose rates and identify the radionuclides present in the primary heat transport system, ...
This year, the VGB Conference 'Steam Turbines and Operation of Steam Turbines 2008' will take place at the Deutsches Haus in Flensburg. By offering the possibility for exchanging experience, this conference aims to also ensure steam turbine operation with high availability and high efficiency in the future. The changing situation of the market and the responses on the parts of the manufacturers and the operators, as well as the responses of the entire service section to this, show that such an exchange of experience is of utmost importance. This year, the conference will focus on the following topics: - reviews - damage - further developing testing methods - monitoring steam turbines - modernising old steam turbines - new products - new developments in the condenser pipe sector. As in previous years, our Co-operation partners will present themselves at a technical exhibition which will ...
This work presents an analysis of the operation of a multi-cylinder, tubro charged, indirect injection diesel engine from a second-law analysis point of view. For this purpose, a single-zone thermodynamic model following the filling and emptying modelling technique is developed. A second-law analysis is performed in all parts of the diesel engine plant, which provides all the existing availability terms and accounts for the evaluation of every component`s irreversibilities. A complete second-law terms tabulation is given for the maximum speed-full load operation case, which is compared with its first-law counterpart. A detailed parametric study is performed in all parts of the diesel engine plant comprising the effects of speed and load on the availability terms in a range that covers the whole operation of the engine under turbocharged action. Various second-law (availability) terms such as indicated and brake work, heat ...
Many types of maintenance activities are performed on contaminated (radioactive) machines and components at the Fast Flux Test Facility (FFTF). When personnel dose levels are within permissible limits, maintenance is performed in contaminated work areas or in gloveboxes. Otherwise, maintenance is performed in the Interim Examination and Maintenance (IEM) Cell, a hot cell that is used to perform tasks that require remote operation. Maintenance is often a combination of manual and remote operation. One such operation was the cleaning of the closed loop ex-vessel machine (CLEM) core component grapple (CCG). The CLEM is used to transfer core components in and out of the reactor vessel. The CCG had not been operating properly due to buildups of metallic sodium and sodium compounds on the outside surface and internal moving parts. This paper tells how the CCG was disassembled and cleaned. Part of this task ...
Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be ...
Control room operators rely on the plant annunciation system to alert them to abnormal operating conditions and changes in plant configuration. A key determinant in annunciation system effectiveness is how well the annunciation system displays support Operations staff to staff to maintain a full understanding of the alarm state and ongoing changes under all operating situations. During unit evolutions, current CANDU alarm generation rates can frequently exceed 10 alarms per minute. With existing annunciation displays that list individual alarm changes, the rapid changes in display presentation can exceed an operator's ability to recognize the changes and maintain a full and up-to-date awareness of unit alarm state. This paper describes annunciation display features and concepts for alternative presentation of unit alarm state and changes that can provide improved support to ...
An adjustment support system using computer for start-up operation of cyclotron is being developed in order to support operators who, using their experiences and intuition, tune up dozens of components to maximize beam efficiency. This paper describes a method of beam pattern diagnosis and adjustment guidance based on fuzzy relation as one function of the adjustment support system. The followings are the basic processes of this method. (1) The computer extracts features of beam pattern which correspond with operators' criteria. (2) The computer calculates causative possibility of each adjustment parameters by inverse operation of fuzzy relational equation, which formulates the relationship between criteria of beam pattern and adjustment parameters. (3) The computer displays those causative probabilities in a graphical manner as a operation guidance. Not only the ...
A summary of the 1983 Critical Solvent Deashing unit performance at the Wilsonville Advanced Coal Liquefaction R and D Facility is presented. All periods of on feed operation, unscheduled shutdowns, and scheduled shutdowns are accounted for and tabulated. Causes of unscheduled shutdowns are identified and discussed. Details of repeated, major maintenance problems with various pieces of equipment are presented. Where applicable, solutions are discussed. Historical operations and maintenance data are presented and used for comparison purposes in order to better indicate areas of improvement in the unit. 4 references, 7 figures, 3 tables.
Wet limestone scrubbing is once again becoming a popular technology for removal of sulfur dioxide (SO{sub 2}) from power plant emissions. Critical to the operation of wet limestone flue gas desulfurization (FGD) systems is accurate chemical analysis of scrubber solids. The analytical technique of thermogravimetry is ideal for this application, as the instrument can give precise readings of the principal scrubber solids components, calcium sulfite/sulfate hemihydrate, calcium sulfate dihydrate (gypsum), and unused calcium carbonate. The data provides plant chemists, engineers, and operators with information needed to fine-tune scrubber operation and detect process upsets. (orig.)
The full scope simulator in Daya Bay Nuclear Power Station is imported from THOMSON-CSF company in France. It is a large facility, using digital simulation technology, that simulate the main control room of Daya Bay Nuclear Power Station with the high fidelity. It is used for training operators; system analyzing including operation procedure verification. The input output interface system of the simulator is the bridge of the information exchange between instrumentation and the computer. From the point of view of data transfer, this paper discusses the operation principle of the I/O interface system.
This paper presents anew design concept for a gamma irradiation plant for the continuous processing of pumpable liquids. Typical applications of such a plant include: the irradiation vulcanisation of natural latex rubber; disinfection of municipal sewage sludge for agricultural use; sterilisation of liquids in the pharmaceutical and cosmetics industries; industrial processing of bulk liquids The authors describe the design and operation of the latex irradiator now operating on a small production scale in Malaysia and proposed developments. The design allows irradiation processing to be carried out under an inert or other gaseous environment. State-of-the-art computer control system ensures the fully automatic processing operation needed by industrial computers.
A nitrogen liquefier and computer controlled valving system have been added to the Bevatron cryoliner vacuum system to cut operating costs by reducing liquid nitrogen consumption. The computer and interface electronic systems, which control the temperatures of twenty-eight liquid nitrogen circuits, have been chosen and designed to operate in the Bevatron's pulsating magnetic field. The nitrogen exhaust is routed back to a liquefier, of about five kilowatt capacity, liquefied, and rerouted through the cooling circuits. A description of the system and operating results are presented.
TVA is currently engaged in an extensive program to mitigate steam generator tube denting at the Sequoyah Nuclear Plant, which is in commercial operation, and to prevent or minimize the onset of denting at the Watts Bar Nuclear Plant, which is under construction. This paper describes TVA's denting mitigation program, which is primarily feedwater chemistry and system operation improvement, and the effect the changes that have been implemented have had on the incidence as well as the progression rate of steam generator tube denting during the past 220 effective full power days of Sequoyah unit 1 operation.
Due to the general market conditions, the construction of steam turbines was greatly reduced in 1987. As in 1986, it came to a downward movement. This situation will heighten in the coming years. The exploitation of devices, which are available by way of the development of EDP in computation, construction, production and operation, leads to considerable improvements. These improvements can only be employed gradually, due to the reduction in production. However, technological progress can be used economically in part in the restoration of old installations. Here turbine construction, the thermodynamical interpretation of gas and steam turbines, developments in the field of conduction technology, piping and materials are described. Also improvements in operation security and operation supervision of the installations is treated, as well as service and maintenance of the plants. (BR) With 131 refs.
Using some modification of the standard fermion technique we derive factorized formula for spin operator matrix elements (form-factors) between general eigenstates of the Hamiltonian of quantum Ising chain in a transverse field of finite length. The derivation is based on the approach recently used to derive factorized formula for Z_N-spin operator matrix elements between ground eigenstates of the Hamiltonian of the Z_N-symmetric superintegrable chiral Potts quantum chain. The obtained factorized formulas for the matrix elements of Ising chain coincide with the corresponding expressions obtained by the Separation of Variables Method.
The RF system for the SuperHILAC injector linac was designed and constructed for minimum system complexity, wide dynamic range, and ease of maintenance. The final amplifier is close coupled to the linac and operates in an efficient semilinear mode, eliminating troublesome transmission lines, modulators, and high level regulators. The system has been operated at over 250 kW, 23 MHz with good regulation. The low level RF electronics are contained in a single chassis adjacent to the RF control computer, which monitors all important operating parameters. A unique 360/sup 0/ phase and amplitude modular is used for precise control and regulation of the accelerating voltage.
It has been proposed that a hidden conformal field theory (CFT) governs the dynamics of low frequency scattering in a general Kerr black hole background. We further investigate this correspondence by mapping higher order corrections to the massless wave equations in a Kerr background to an expansion within the CFT in terms of higher dimension operators. This implies the presence of infinite towers of CFT primary operators with positive conformal dimensions compatible with unitarity. The exact Kerr background softly breaks the conformal symmetry and the scaling dimensions of these operators run with frequency. The scale-invariant fixed point is dual to a degenerate case of flat spacetime.
Development Service Order {number_sign}90025 requested recommendations for computer hardware, operating systems, and software development utilities based on current and future SIMON software requirements. Since SIMON`s main objective is to be dispatched on missions by an operator with little computer experience, ``user friendly`` hardware and software interfaces are required. Other design criteria include: a fluid software development environment, and hardware and operating systems with minimal maintenance requirements. Also, the hardware should be expandable; extra processor boards should be easily integrated into the existing system. And finally, the use of well established standards for hardware and software should be implemented where practical.
Faced with a changing business emphasis, plus the need to reduce operations and maintenance costs in the North Sea, the Forties Field engineering partnership between BP and Brown and Root recognised the need to make radical changes in its organisational structure. An innovative change management programme was planned and executed inside 12 months with the purpose of right-sizing the Forties Operations Engineering team. Not only has the initiative succeeded in cutting costs by 40 per cent; it has also enhanced the quality of engineering support services supplied to the BP Forties platforms. (author)
In this paper, an approximate curve fitting method for photovoltaic modules is presented. The operation is based on solving a simple solar cell electrical model by a microcontroller in real time. Only four voltage and current coordinates are needed to obtain the solar module parameters and set its operation at maximum power in any conditions of illumination and temperature. Despite its simplicity, this method is suitable for low cost real time applications, as control loop reference generator in photovoltaic maximum power point circuits. The theory that supports the estimator together with simulations and experimental results are presented. (author)
Criticality was first achieved with the Fast Flux Test Facility (FFTF) a little more than 10 yr ago on February 9, 1980. Although the FFTF was designed and built primarily for testing fuels, materials, and components for the liquid-metal fast breeder reactor program, it has, over its first 10 yr of operation, provided valuable information in many other areas. This paper provides a summary of the contributions to the physics of liquid-metal reactors (LMRs) obtained from operation of and testing in the FFTF, with emphasis on some of the more significant and interesting accomplishments.
Surface doses received by patients and operators were measured during 30 interventional radiological procedures (ten percutaneous transhepatic biliary drainages, ten percutaneous nephrostomies, ten percutaneous transluminal angioplasties). In addition, organ doses to the patient were determined using an Alderson-Rando phantom. These served as a basis for calculating the so-called somatic dose indices. It was found that the somatic radiation risk to the patient is relatively small despite prolonged periods of fluoroscopy. However, exposure of the hands and lenses of the operator could easily reach the limits thought acceptable while carrying out these procedures with additional angiography. (orig).
Originally designed exclusively for peak load covering, pumped storage plants are now faced with new challenges brought about by the deregulation of the electricity market and the substantial growth of wind power capacity. Today's pumped storage plants are started more frequently and often for shorter periods of time. The grid controlling tasks have increased the importance of the role played by this type of power plant and improved sales considerably. But the operational demands have grown substantially as well. This paper discusses the ensuing adaptation of power plant operation as well as options available to power plant operators. (orig.)
The second international conference on containment design and operation included sessions on the following topics: performance and regulatory requirements; radionuclide behaviour; severe accident design and analysis; operation, maintenance, leaking and aging of containment systems; thermal hydraulic behaviour of containment systems; hydrogen mixing and mitigation; design methods and concepts; code validation; structural analysis and response tests; passive safety systems; aerosol behaviour; containment reliability, integrity, and risk assessment; hydrogen deflagration and detonation. Due prominence was given to CANDU and other PHWR reactors. The individual papers have been abstracted separately.
The symposium covers papers under different sections namely, (i) Core physics and Fuel management, (ii) Commissioning of facilities and systems, (iii) Operational experience and Human resource development, (iv) Fuel handling, Maintenance management and Surveillance, (v) Instrumentation and Control and Power supply systems, (vi) Analysis, modifications and developments for enhancing operational safety, (vii) Chemistry control and Effluent management, (viii) Radiation and industrial safety and (ix) Steam generators, Turbo-generators and other auxiliaries. Papers relevant to INIS are indexed separately. (author)
Initial design parameters and early operational results of a 50 MeV high brightness electron linear accelerator are described. The system utilizes a radio frequency electron gun operating at a frequency of 2.856 GHz and a nominal output energy of 4.5 MeV followed by two, 2#pi#/3 mode, disc loaded, traveling wave accelerating sections. The gun cathode is photo excited with short (6 psec) laser pulses giving design peak currents of a few hundred amperes. The system will be utilized to carry out infra-red FEL studies and investigation of new high gradient accelerating structures.
A first sub-set of the collimation system has been installed for the 2008 first beam commissioning of the LHC. It included 88 collimators around the ring and the two injection lines. Each collimator has two jaws for which must be controlled and monitored with high precision. The LHC collimation system was put into operation from July to October 2008. The installed system is described and first results from system operation without and with beam are presented. It is shown that the LHC collimation system achieved the specified accuracy and reproducibility of jaw positioning. Next steps in collimation commissioning are described and planned system upgrades for high beam intensities are outlined.
Methods are discussed for optimization of organizational model of longwall mining. Operations at a working face, their duration, number of miners, miner qualifications are analyzed. The so-called method for allocation of heteregeneous resources is used. Using the method optimum organizational models of working faces are constructed. The models consider working conditions, coal output, personnel, miner qualifications, duration of various operations and of idletime, and safety regulations. A computer code developed by the author for optimizing organizational models of longwall mining is described. 9 refs.
The matrix representations of Witten's and B-algebras of the field string theory in finite dimensional space of the ghost states are suggested for the case of Virasoro algebra truncated to its SU(1,1) subalgebra. In this case all algebraic operations of Witten's and B-algebras are realized in explicit form as some matrix operations in the graded complex vector space. The structure of string action coincides with the universal non-linear cubic matrix form of action for the gauge field theories. These representations lead to matrix conditions of theory invariance which can be used for finding of the explicit form of corresponding operators of the string algebras. (author).
Four major reasons why municipal resource recovery operations are uneconomical are analyzed. These reasons are: alternative municipal waste disposal methods are artificially underpriced when the costs of meeting modern environmental standards are considered; high capital costs related to the procurement of resource recovery systems and the marketing of recovered resources; uncertainties associated with the costs and performance of resource recovery technologies; and construction and operating risks of municipal waste resource recovery systems. If resource recovery is to become economical, purchasers of plants must develop innovative process designs and equipment and formulate new operating and maintenance procedures. (1 photo)
The DP West Plutonium Facility operated by the Los Alamos National Laboratory, Los Alamos, New Mexico, was decontaminated between April 1978 and April 1981. The facility was constructed in 1944 to 1945 to produce plutonium metal and fabricate parts for nuclear weapons. It was continually used as a plutonium processing and research facility until mid-1978. Decontamination operations included dismantling and removing gloveboxes and conveyor tunnels; removing process systems, utilities, and exhaust ducts; and decontaminating all remaining surfaces. This report describes glovebox and conveyor tunnel separations, decontamination techniques, health and safety considerations, waste management procedures, and costs of the operation.
To improve operational safety of the fuel channel for Wolsung units the recommended primary heat transport system (PHTS) operating guidelines were developed, which provides a safe operation window in terms of pressure and temperature to maintain fuel channel integrity, which is similar to pressure-temperature curves used for primary pressure boundary integrity in PWRs and deterministic Leak-Before Break (LBB) analyses were conducted using recent understanding of delayed hydride cracking (DHC) mechanism. In addition, a comparative assessment of LBB analysis was made using the procedures of Fitness For Service Guidelines(FFSG) for pressure tubes rev. 0 and rev. 1.
The claim that focus evokes a set of alternatives is a central issue in several accounts of the effects of focus on interpretation. This article presents two empirical studies that examine whether this property of focus is independent of contextual conditions. The syntactic operation at issue is object-fronting in German, Spanish, Greek, and Hungarian licensed by contexts involving focus on the object constituent. This operation evokes the intuition that the fronted referent excludes some or all relevant alternatives. The presented experiments deal with the question whether this interpretative property obligatorily accompanies the operation at issue or not. The empirical findings show that in German, Spanish, and Greek this intuition depends on properties of the context and is sensitive to...
This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.
Purpose : To obtain an emergency core cooling device in a FBR type reactor by utilizing heat pipes which are not actuated at usual operation condition but actuated reliably upon emergency. Constitution : A system for injecting heat medium into heat pipes is provided. By injecting the heat medium into the heat pipes upon emergency to actuate the heat pipes, the reactor core is cooled. During normal reactor operation, the inside of the heat pipes is evacuated from a vacuum pump and no heat medium is filled therein, whereby unnecessary heat loss during the normal operation can be prevented. (Ikeda, J.).
This report considers the effect of pipe-whip restraints and snubbers on the normal operation of piping systems in nuclear power plants. Also considered are the effect of these postulated event devices on reliability, economics, and the exposure of plant personnel to radiation. Field data were gathered from three nuclear power plants that had applied for Operating Licenses. Criteria, design philosophies, and data were obtained from the respective nuclear steam system suppliers, architects-engineers and utilities.
Higher efficiencies of steam power plants are achieved by raising the operating temperature and pressure. The use of ferritic steels helps to minimize the cost and enhance the flexibility (two-shift operation, frequent starting and stopping). The COST programme had the long-term goal of developing and testing 9- 12 % Cr steels with high fatigue strength and to produce,test and operate critical components for an advanced steam power plant (steam temperature 600 C and supercritical pressure). (orig.)
The E1 and E3 transition operators in the sdf-IBA model are discussed. An effective E1 operator containing one- and two-body terms explains very well the E1 data in transitional and rotational nuclei. The E1 parameters for rotational nuclei are obtained by imposing a constraint on the IBA model namely, the validity of Alaga rules for ``pure K`` states. The systematic behavior of the octupole strength is well reproduced using a one-body octupole operator. The anomalously large fragmentation of the low-energy octupole strength in non-rotational nuclei is shown to be a signature of the O(6) dynamical symmetry.
The importance of radiation management for nuclear facilities including nuclear power plants has increased as the general public understanding has progressed, and necessary information for management must be processed exactly and quickly. In nuclear power plants, radiation management is performed by each individual operation, and collected information is managed by the system of each operation. The distributed-processing radiation management system has been developed aiming to use a general-purpose LAN and make quick and efficient use of information managed by individual operations. This paper describes the system configuration and functions. (author)
The objective of Configuration Risk Management Program(CRMP) is to maintain the safety level by assuring the defense-in-depth of nuclear power plant while the configurations are changed during plant operations, especially for the LP/SD. Such a safety purpose can be achieved by establishing the risk monitoring programs with both quantitative and qualitative features. Generally, the quantitative risk evaluation models, i.e., PRA models are used for the risk evaluation during full power operation, and the qualitative risk evaluation models such as safety function assessment trees are used. Through this study, safety function assessment trees were developed.
The operation of steam turbines is technically controllable. The manufacturers specify reliable operating ranges as well as demands on the implementation of steam turbines into the power plant process for the respective steam turbines. The VGB guidelines describe the generally valid procedures for the operation of steam turbines in detail. Important insights at some steam turbines are not or only insufficiently converted nevertheless. Damage and extended downtimes at revisions are the result. The author of the contribution under consideration describes some more and more occurring problems. Recommendations and suggestions are given with respect to the avoidance of such findings.
Conversion of the United States military to the International System of measurement units is in the very early stages. Little formal planning has been done to articulate the management required to complete the conversion of operational Army and Air Force units. For those operational forces tasked to provide continuous combat readiness throughout metrication, management problems associated with the conversion are particularly difficult because of the nature of these assigned missions. This is the case for the 82nd Airborne Division ready brigade force (DRB) and the Military Airlift Command (MAC) strategic airlift system operating the C-141 and C-5A aircraft.
This paper experimentally evaluates the effects of applying autonomic management to the scheduling of maintenance operations in a deployed Chord network, for various membership churn and workload patterns. Two versions of an autonomic management policy were compared with a static configuration. The autonomic policies varied with respect to the aggressiveness with which they responded to peer access error rates and to wasted maintenance operations. In most experiments, significant improvements due to autonomic management were observed in the performance of routing operations and the quantity of data transmitted between network members. Of the autonomic policies, the more aggressive version gave slightly better results.
A theory of the asymptotic functions for the case of many variables is presented. It is shown that the class F(R"N) of these generalized functions is closed in respect to the linear algebraic and analytic operations, multiplication as well as a set of linear and polynomial changes of the variables. The existence in F(R"N) of analogues (consistent with the linear operations) of the Schwartz distributions with point support is proved. In terms of these analogues, some formulae for singular products and changes of variables of the Dirac #delta#-function and its derivatives #delta#"("i")(x), x is an element of R"N, are given. (author). 14 refs.
Various schemes of cooling have been investigated for the purpose of assessing potential benefits on the operational characteristics of the Syrian MNSR reactor. A detailed thermal hydraulic model for the analysis of MNSR has been developed. The analysis shows that an auxiliary cooling system, installed in the pool which surrounds the lower section of the reactor vessel, will significantly offset the consumption of excess reactivity due to the negative reactivity temperature coefficient, Hence, the maximum operating time of the reactor is extended. Compared with experimental data, the suggested model proves to be valid for the analysis of MNSR behavior under both steady state and transient conditions. (author)
The paper considers the cyclic variations in performance parameters of a dual fuel engine fuelled with methane. It is shown that such an engine does display cyclic variations that are greater than the corresponding diesel operation, yet smaller than comparable spark ignition operation. The extent of cyclic variation in peak cylinder pressure and ignition delay increases, for any power output, as the pilot diesel quantity is reduced and the extent of gas substitution is increased. The use of extremely small pilots in the unmodified engine can lead to erratic engine performance. Greater cyclic variations are associated with low lead rather than high load operation.
The algorithmic, or consistent, tangent stiffness was introduced to improve the asymptotic convergence rate of the iterative correction algorithm for the evolutive analysis of elastoplastic structures. The original approach is based on a formulation of the elastoplastic law in terms of a plastic multiplier with an analysis which, in general, requires an operator inversion. A geometric description of the method, based on hypersurface theory, is proposed here to provide a clear picture of the algorithmic properties. An estimate of the tangent stiffness associated with finite step elastoplastic and elastoviscoplastic constitutive models is given. It is based on the properties of the projection operator on the elastic domain and avoids operator inversions retaining the beneficial properties of...
As an International Organization, one the most important issues that CERN has to respect and guarantee is the protection of the environment. Several of ST activities and operations have a direct impact on the environment: civil engineering works, electrical (transformers) and air-cooling operation, chemical products storage, various waste disposal etc.... Important measures, taken in the past, have to be kept and new ones should be applied in order to insure the conformity of the infrastructure with existing legislation, the correct operation of equipment and systems, the constant monitoring of the different situations and the traceability of the events. Moreover good management of the environment would bring large savings to CERN.
An analysis of the current state of track-laying operations in open-cut mines is given and their labor intensive nature is noted. The lag in the technological development of mechanization equipment for track laying and repair operations is noted. Results are given from developments by the Scientific Research Institute of Open-Pit Mining Operations in the field of mobile transportation technology and promising modular route design. Also examined are the problems of improving the routing bases in the industry. The absence of factories for manufacturing transportation technology and equipment is reflected most evidently in the technical and cost characteristics of coal production by an open-cut method and requires immediate solution.
Control of pressure transients in a hydraulic system may be important and necessary to avoid failures and to improve the efficiency of operation. Flow restricting devices can result in a decrease in the peak pressure, but may change the response time. The response time has an important effect on both operator and operator perceived smoothness. The response time should correspond to how fast a system responds to a given disturbance at the system boundary. Occasionally the appropriate response time is not easily determined. This study is on the response time characteristics in the hydraulic system studied for the control of response time.
There is increasing pressure to operate laboratory facilities in environmentally and financially sustainable ways. A key factor in achieving this goal is careful consideration of how energy is used by the buildings' ventilation system, both for conditioning air supplied to the laboratories and the energy used moving air through the building. Traditionally, laboratory energy use is treated as an engineering concern within the scope of the building's overall design and operation. However, this approach limits the involvement of key stakeholders in many important decisions and can lead to unexpected safety concerns for the laboratory's users. We believe that a broad view of the parties affected by a laboratory building's operations is necessary to avoid having the various stakeholders working...
The article focusses on operational experience gained with the following items: scrubbing system with oxidation, regenerative gas preheater, blower/fan, aerosol filter, and product processing. (orig./PW).
How to decide which mine surface tasks may be performed by industrial robots to improve productivity and working conditions is described. Charts are presented of the industrial tasks performed on the surface and how each task may be classified as light, average, difficult or very diffcult according to a defect criteria is explained (defective operations are those which involve, heavy, harmful, stressful or dangerous jobs). The results of these calculations are used to identify which operations are suitable for first introduction of robots since traditional automation methods cannot be used, e.g. various storage, loading and packaging tasks, coal selection, sorting and removal of foreign matter, provision of services such as food preparation, cleaning, etc. Robots may also be used to control automated operations that are monotonous and hazardous for human operators. It is envisaged that in the future ...
... For short-warning crises in other regions, Marine Expeditionary Units, the 82nd Airborne Division, Special Operations Forces, and Air Force/Navy ...
... Division and the 82nd ABN Division spearheaded a ... attack through the stalled 90th Division to ... mi,_es, which included airborne infantrv, regular ...
Safety in general and harmonization of International Maritime Organization rules on mobile offshore drilling rig operation in particular are discussed. The improvement of the industry's safety record is also discussed.
The installation and performance of a water source heat pump in Minnesota are discussed. The operating cost was found to be higher than expected. (MHR)
The IAEA Assessment of Safety Significant Events Team (ASSET) report presents the results of an ASSET team's assessment of their investigation of the effectiveness of the plant for prevention of incidents since 1990 at Zaporozhe nuclear power plant. The results, conclusions and suggestions presented herein reflect the views of the ASSET experts. They are provided for consideration by the responsible authorities in Ukraine. The ASSET team's views presented in this report are based on visits to the plant, on review of documentation made available by the operating organization and on discussions with utility personnel. The report is intended to enhance operational safety at Zaporozhe by proposing improvements to the policy for the prevention of incidents at the plant. The report includes, as a usual practice, the official response of the operating organization as well as of the regulatory body to the ASSET recommendations. ...
This report summarizes the 1981 operating and test data obtained at the six ton per day Advanced Coal Liquefaction Research and Development Facility in Wilsonville, Alabama. Special emphasis is placed on data accumulated during the fourth quarter of 1981. The Wilsonville R and D Facility was in operation 71% of 1981 (70% of the fourth quarter) with scheduled shutdowns accounting for 23% of the downtime (28% during the fourth quarter). Kentucky 9 coal from the Fies mine was processed in all runs conducted during 1981 (Runs 222 through 235). The hydrotreater (HTR) unit was brought on stream successfully in May 1981. The three process units of the Wilsonville facility were operated in a non-integrated mode during the second half of 1981. Significant data was obtained and is summarized.
roller bearing with a one-piece inner ring. The lubricant experimental data on high-speed roller .... roller bearing. The outer ring of the test bearing was ...
Apr 7, 2011 ... You cannot be in any type of pay status (e.g., annual leave, sick leave, .... Retirement System (FERS) and the Civil Service Retirement System ...
... heavy divisions in the Contingency Corps should ... During Operation Desert Shield the 82nd Airborne Division initially deployed a reinforced attack ...
... see http://www.spawar.navy.mil/robots/ ), during which ... pixel-accurate routes for a small ground robot using aerial ... a USV, a UAV and a UUV as well ...
... Abstract : Iraqi armored and mechanized divisions crossed the border of ... quick response, the first elements of the 82nd Airborne Division arrived in ...
SUMMARYThe aim of this study was to determine middle ear pressure changes during the operation performed under anaesthesia induced by isoflurane or desflurane. This was a prospective,...Full Text Available
There is a rapidly growing need to evaluate sensor network functionality and performance in the context of the larger environment of infrastructure and applications in which the sensor network is organically embedded. This need, which is motivated by complex applications related to national security operations, leads to a paradigm fundamentally different from that of traditional data networks. In the sensor networks of interest to us, the network dynamics depend strongly on sensor activity, which in turn is triggered by events in the environment. Because the behavior of sensor networks is sensitive to these driving phenomena, the integrity of the sensed observations, measurements and resource usage by the network can widely vary. It is therefore imperative to accurately capture the environmental phenomena, and drive the simulation of the sensor network operation by accounting fully for the environment effects. In this paper, we illustrate the ...
... operational AUV and Unmanned Underwater Vehicle (UUV) ... by Brooks with land-based robots [BROOKS 88 ... system for a mobile land robot called ...
The document provides: An overview of CCS technology including what plant equipment is novel and what is currently in use within the CCS or other industries; An in depth guide to carbon dioxide to broaden the readers understanding of the material and its health and safety issues; Key design features of plant and pipelines for carbon dioxide service including experience gained from the industrial gases sector; and Key operational information for plant and pipelines for carbon dioxide service including experience gained from the industrial gases sector to ensure that your operating practices take into account the latest operational experiences from carbon dioxide plant. 45 figs., 18 tabs.
The purpose of this publication is to provide a better understanding of flue gas desulfurization. It provides brief answers to questions concerning its applicability, cost, effectiveness, and operation.
familiarity fire triangle (i.e., fuel, oxidant, and ignition source) are excluded. It Is obvious that for the baseline safety goal for spacecraft this ...
... Ready-to-Eat (MRE) VIII operational ration was evaluated at a field training exercise (Market Square II) with troops of the 82nd Airborne Division. ...
In order to improve the well-known short operational life time of BF3 counters, three potential adsorbents for impurity gases (graphite, activated charcoal and a zirconium-aluminum mixture) were introduced into BF3 counters in the form of coating on the aluminum cathode surface. Tests in el fields revealed that a partial coating of activated charcoal provides the best result. The improvement of their operational life in el fields was about three orders of magnitude in terms of tolerable exposure. Many counters with a partial coating of activated charcoal were further tested from the following viewpoints: background noise, vibration and shock, el pulse discrimination, operational life in a neutron field and non-operational in-reactor exposure life. The results were satisfactory for reactor control and protection usage. (author).
... and Unmanned Undersea Vehicle (UUV) communities as well. ... utilizes the Multi-Robot Operator Control ... Extending Mobile Security Robots to Force ...
... This is the case for the 82nd Airborne Division ready brigade force (DRB) and the Military Airlift Command (MAC) strategic airlift system operating ...
A case of intrathoracic lipoma in a child is presented. The diagnosis was made before operation by means of computer-assisted tomography, a non-interventional procedure.
pumped storage plants; but these must be built as well since there is no correspondence with the pump and turbine operating times governed by normal network ...
... irispectors to operate or Soviet territory. They exr-essed this reluctarice ir interniat ionai law terms, claimirig that inspect ior act ivit ies ...
In this paper, a neural networks (NN) based adaptive sliding mode controller (SMC) is introduced. The selection of SMC feedback gains is normally based on one operating point and thus the performance of the controller away from the design operating point is, of necessity, a compromise. The adaptive SMC is proposed to overcome the limitations imposed on the effectiveness of the SMC under different operating conditions. Neural networks are used for online prediction of the optimal SMC gains when the operating point changes. The proposed method has been applied to a power system stabilizer (PSS) of a single machine power system. Simulation results are included to demonstrate the performance of the proposed control scheme.
In this paper, a neural networks (NN) based adaptive sliding mode controller (SMC) is introduced. The selection of SMC feedback gains is normally based on one operating point and thus the performance of the controller away from the design operating point is, of necessity, a compromise. The adaptive SMC is proposed to overcome the limitations imposed on the effectiveness of the SMC under different operating conditions. Neural networks are used for online prediction of the optimal SMC gains when the operating point changes. The proposed method has been applied to a power system stabilizer (PSS) of a single machine power system. Simulation results are included to demonstrate the performance of the proposed control scheme.
... 1 1 if on-line printout is desired (data will also be stored on tape) = 0 or blank, reduced data will be stored on a listable tape P3 M Codes B - Corivert ...
Valve Flow Characteristics. 3-68. 3-40. Valve Operating Current Vs. Temperature ...... VALVE FLOW CHARACTERISTICS. Acceptance Test 4/29/74. SINs 002 & 004 ...