The feasibility study was conducted on a model project in Vietnam, aimed at solving the environmental pollution problems resulting from use of coal by demonstrating and disseminating the Japan's environmental technologies in the Southeast Asian countries. The feasibility study was conducted for the Cua Ong Coal Preparation Enterprise, which has the largest coal preparation capacity in Vietnam and port facilities. It is treating raw coal from 10 coal mines for classification and preparation, and shipping coal of various types that meet the standards for domestic use and export. The survey results point out that unrecovered coal remains in waste water discharged from the coal preparation plants to pollute the sea area, and that quantity of the refuse increases because of the unrecovered coal it contains. The environmental technologies needed to introduce include modification to variable wave pattern type jigging separator, refuse height measuring instrument and automatic ...
Introduction of geothermal heat pump systems, which depend on temperature differential, is investigated for urban areas, which have large energy demands. Results of the surveys on the current situations of geothermal heat pump (GHP) systems indicate that they have already numbered 300,000 units in USA and totaled more than 50,000 units in Switzerland and Northern European countries, and that they are increasing at an annual rate of higher than 10%. The results also indicate that introduction of these systems are well feasible in Japan, which generally has better topographical conditions than American and European countries, and the GHP system with vertical ground heat exchanger is investigated for its topographical and environmental considerations. These systems could annually abate approximately 52 million tons of CO2 (4.3% decrease), if disseminated to all households. They are also expected to help control the heat island phenomenon, and reduce peak power consumption. The ...
Substation machinery foundation works have some features such as a number of work cases second look cases in design, and so forth. The Tohoku Electric Power Co., Inc. started the development of a system generally supporting the substation machinery foundation design to practical use the Engineering Work Station (EWS) introduced to the civil engineering department as a part of improvement of management efficiency. At first, rigid foundation design support system (TRAD) and slab foundation design support system (KANSAS-IN) automatically conductible with from preparation of design and amount calculation sheet to preparation of design drawing was developed, which was began to operate since March of 1996. As a result, the rigid foundation design became able to execute fully automatic works from preparation of design and its drawing to amount calculation. And, on the slab foundation design, three dimensional FEM analysis could be executed for shorter time, which made wide range of time ...