Site studies for CANDU type NPP began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. A team was charged to develop all packages of the necessary main studies. The first Romanian NPP CANDU 6 type reactor gone to erection on Cernavoda site, planned to have 5 units and, like Wolsong NPP, applied the same design for the nuclear island. For the BOP parts the ANSALDO-GE project was applied with a thorough concern about requirements raised by connection to NSP. The first mission of design and research multi-branch team was to adapt the NPP Cernavoda project having an open water cooling circuit 'once-through' to the new parameters of a close recirculation water cooling circuit. Also, the structural design was re-evaluated for the case of soft foundation strata instead of hard rock ones. The close recirculation water cooling circuit system was applied for PWR NPP type like in French or ...