This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.
This volume is a summary of the results of the final report of the Energy Engineering Analysis Program (EEAP) Study of 30 selected dining facilities at Fort Campbell, Kentucky.
This work presents and describes the natural radioactive occurrence in oil facilities. The origins of the detected radioactivity and the reasons of its settlement are discussed. The measurements results carried out in oil facilities in the Neuquina basin (Argentine) are shown in this work. The aim is to describe the actual situation and to evaluate the magnitude of the problem. Finally, recommendations are proposed to protect the health of the workers, especially of those who carry out the cleaning of the equipment, and to guarantee an appropriate final disposal for the generated radioactive residuals. (author)
The field of ion acceleration to higher energies has grown rapidly in the last years. Many new facilities as well as substantial upgrades of existing facilities have extended the mass and energy range of available beams. Perhaps more significant for the long-term development of the field has been the expansion in the applications of these beams, and the building of facilities dedicated to areas outside of nuclear physics. This review will cover many of these new developments. Emphasis will be placed on accelerators with final energies above 50 MeV/amu. Facilities such as superconducting cyclotrons and storage rings are adequately covered in other review papers, and so will not be covered here.
In 1993, the US Department of Energy (DOE) decided to shut down the Fast Flux Test Facility (FFTF) due to lack of national missions that justified the annual operating budget of approximately $88M/year. The initial vision was to ''deactive'' the facility to an industrially and radiologically safe condition to allow long-term, minimal surveillance storage until approximately 2045. This approach would minimize near term cash flow and allow the radioactive decay of activated components. The final decontamination and decommissioning (D and D) would then be performed using then-current methodology in a safe and efficient manner. the philosophy has now changed to close coupling the initial deactivation with final D and D. This paper presents the status of the facility and focuses on the future challenge of sodium removal.
The technology being evaluated is the Modified In-Situ (MIS) retorting process for raw shale oil production, combined with a Circulating Fluidized Bed Combustor (CFBC), for the recovery of energy from the mined shale. (VC)
While tritium exposure to the site-workers in Wolsung NPP is up to about 40% of the total personnel exposure, Ministry of Science and Technology has asked tritium removal facility for requirement of post heavy-water reactor construction. For the purpose o...
This Final Technical Report provides an account of the project for the demonstration of Black Liquor Gasification at Georgia-Pacific LLC's Big Island, VA facility. This report covers the period from May 5, 2000 through November 30, 2006.
The Decree specifies basic quality assurance requirements applicable to machines, their parts and materials, civil engineering structures, means for automated control of technological processes including hardware and software, and electricity supply systems related to nuclear safety of nuclear facilities, and stipulates binding procedures for the implementation of technical and organizational provisions associated with the quality of selected equipment to ensure nuclear safety of nuclear facilities. Safety classes are defined for selected equipment. Requirements laid on safety assurance documentation are specified, and requirements placed on safety assurance programmes, their preparation, finalization and approval are defined. Quality assurance requirements are also specified with respect to the designing, manufacture, construction, operation, repair, modification and decommissioning of nuclear ...
This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.
The Mixed Waste Management Facility, or MWMF, has been proposed as a national testbed facility for the demonstration and evaluation of technologies that are alternatives to incineration for the treatment of mixed low-level waste. The facility design will enable evaluation of technologies at pilot scale, including all aspects of the processes, from receiving and feed preparation to the preparation of final forms for disposal. The MWMF will reduce the risk of deploying such technologies by addressing the following: (1) Engineering development and scale-up. (2) Process integration and activation of the treatment systems. (3) Permitting and stakeholder issues. In light of the severe financial constraints imposed on the DOE and federal programs, DOE/HQ requested a study to assess the cost benefit for the MWMF given other potential alternatives to meet waste treatment needs. The MVVMF Project was asked to ...
A dry interim storage facility has been constructed at the Wolsung power plant in Korea. This dry storage facility has seven separated modules. There are 40 long slender cylinders in one module. In one cylinder, ten baskets where sixty CANDU spent fuel bundles are loaded are stacked and stored. For this dry storage facility, analyses and tests for hypothetical accident conditions that might occur while moving and storing the baskets into a cylinder were performed. In a demonstration test, one of test basket models did not satisfy one of the safety-related requirements. Thus, the revised basket designs were generated using a structural evaluation based on finite element analyses and specimen tests. Among these revised designs, one design was chosen as a final revised basket design. The fina...
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.
Sandia National Laboratories has recently developed two major field test capabilities for unattended ground sensor systems at the Department of energy`s Nevada Test Site (NTS). The first capability utilizes the NTS large area, varied terrain, and intrasite communications systems for testing sensors for detecting and tracking vehicular traffic. Sensor and ground truth data can be collected at either of two secure control centers. This system also includes an automated ground truth capability that consists of differential Global Positioning Satellite (GPS) receivers on test vehicles and live TV coverage of critical road sections. Finally there is a high-speed, secure computer network link between the control centers and the Air Force`s Theater Air Command and Control Simulation Facility in Albuquerque NM. The second capability is Bunker 2-300. It is a facility for evaluating advanced sensor systems for monitoring activities ...
This Final Report documents the research accomplishments achieved in the first phase of operations of a new Advanced Photon Source beam line (7-ID MHATT-CAT) dedicated to real-time x-ray studies. The period covered by this report covers the establishment of a world-class facility for time-dependent x-ray studies of materials. During this period many new and innovative research programs were initiated at Sector 7 with support of this grant, most notably using a combination of ultrafast lasers and pulsed synchrotron radiation. This work initiated a new frontier of materials research: namely, the study of the dynamics of materials under extreme conditions of high intensity impulsive laser irradiation.
A Final Environmental Impact Statement (FEIS) related to the licensing of Envirocare of Utah, Inc.`s proposed disposal facility in Tooele county, Utah (Docket No. 40-8989) for byproduct material as defined in Section 11e.(2) of the Atomic Energy Act, as amended, has been prepared by the Office of Nuclear Material Safety and Safeguards. This statement describes and evaluates the purpose of and need for the proposed action, the alternatives considered, and the environmental consequences of the proposed action. The NRC has concluded that the proposed action evaluated under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, is to permit the applicant to proceed with the project as described in this Statement.
A thermohydraulic study of MTR fuel element is presented as a basic requirement for the development of an irradiation facility for testing fuel elements. A computer code named 'Thermo' has been developed for this purpose, which can stimulate different working conditions, such as, cooling, power elements and neutron flux, performing all pertinent thermohydraulic calculations. Thermocouples were used to measure the temperature gradients of the cooling fluid throughout the IEAR-1 reactor core. All experimental data are in good agreement with the theoretical model applied in this work. Finally, a draft of the proposed facility and its safety system is presented. (author)
This study characterized selected commercial volume reduction technologies as to performance and associated costs. VR facility designs were developed for each of the reference VR technologies. Associated on-site storage requirements and cost were also determined. Eight VR technologies were selected for consideration: improved compactor; high pressure compactor (supercompactor); incinerator; fluid bed dryer and incinerator; evaporator crystallizer; evaporator extruder; mobile incinerator; and mobile thin-film evaporator. A representative facility design was developed for each VR technology and for several combinations of technologies. Thirteen separate cases are noted in the following table when retrofit and new facilities are considered.
In 2008 the German National Analysis Facility (NAF) at DESY was established. It is attached to and builds on top of DESY Grid infrastructure. The facility is designed to provide the best possible analysis infrastructure for high energy particle physics of the ATLAS, CMS, LHCb and ILC experiments. The Grid and local infrastructure of the NAF is reviewed with a focus on the ATLAS part. Both parts include large scale storage and a batch system. Emphasis is put on ATLAS specific customisation and utilisation of the NAF. This refers not only to the NAF components but also to the di erent components of the ATLAS analysis framework. Experience from operating and supporting ATLAS users on the NAF is presented in this paper. The ATLAS usage of the di erent components are shown including some typical use cases of user analysis. Finally, the question is addressed, if the design of the NAF meets the ATLAS expectations for effcient data ...
Volume four contains calculations for: Borrow areas--site evaluation; temporary facilities--material quantities; embankment quantities--excavation and cover materials; Burro Canyon site excavation quantities--rippable and unrippable materials; site restoration--earthwork quantities and seeding; and bid schedule quantities and material balance.
This decision document presents the selected remedial action for the former Asarco Tacoma Smelter Facility and adjacent slag peninsula, in Ruston and Tacoma, Washington. This Record of Decision (ROD) describes the final cleanup remedy for soil, slag and surface water and disposal of hazardous soils, demolition debris, and residential soils. This ROD is intended to be an interim action for ground water.
This report contains a set of nomographs which can be used to estimate the average annual solar fraction for solar space and water heating at a large number of DOD facilities. The solar fraction estimated from the nomograph is in close agreement with F-Chart 3.0 and allows for variation of the following parameters: annual load, collector area, collector transmittance-absorptance coefficient, and collector overall loss coefficient.
A set of nomographs is presented which can be used to estimate the average annual solar fraction for solar space and water heating at a large number of DOD facilities. The solar fraction estimated from the nomograph is in close agreement with F-Chart 3.0 and allows for variation of the following parameters: annual load, collector area, collector transmittance-absorptance coefficient, and collector overall loss coefficient.
A set of nomographs is provided which can be used to estimate the average annual solar fraction for solar space and water heating at a large number of DOD facilities. The solar fraction estimated from the nomograph is in close agreement with F-Chart 3.0 and allows for variation of the following parameters: annual load, collector area, collector transmittance-absorption coefficient, and collector overall loss coefficient.
The study reported was conducted to evaluate water source community heat pump systems for possible installation to serve a number of homes which are to be constructed in the northeast section of Radisson, New York. Although specific sites and facilities have been evaluated, it is the intent of this study to be site specific only to the extent of climatic conditions. In other words, the results of this study should apply to any area with similar climate.
Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.
This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period January 1, 2005 through March 31, 2005. The following tasks have been completed. First, the renovation of the new Combustion Laboratory is nearly complete, and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building is in the final stages. Second, the fabrication and manufacture of the CFBC Facility is being discussed with a potential contractor. Discussions with potential contactor regarding the availability of materials and current machining capabilities have resulted in the modification of the original designs. The selection of the fabrication contractor for the CFBC Facility is expected during the next quarter. Third, co-firing experiments conducted with coal ...
The reference concept 'direct disposal of spent fuel' was developed as an alternative to spent fuel reprocessing and vitrified HLW disposal. The technical facilities necessary for the implementation of this reference concept - the so called POLLUX-concept, e.g. interim storages for casks containing spent fuel, a pilot conditioning facility, and a special cask 'POLLUX' for final disposal have been built. With view to a geological salt formation all handling procedures for the repository were tested aboveground in a test facility at a 1:1 scale. To optimise the concept all operational steps are reviewed for possible improvement. Most promising are a concept using canisters (BSK 3) instead of POLLUX casks, and the direct disposal of transport and storage casks (DIREGT-concept) which is the most recent one and has been designed for the direct disposal of large transport and storage casks. The ...
In many facilities, energy management is simply a matter of managing the energy required for lighting and space conditioning. In many others, however, energy management is much more complex and involves large motors and controls, industrial insulation, complex combustion monitoring, unique steam distribution problems, significant amounts of waste heat, etc. Typical facilities offering large energy management opportunities include industrial facilities, large office and commercial operations, government institutions such as schools, hospitals and prisons. Such facilities generally have specialized industrial, commercial or institutional processes that incorporate many of the concepts covered in other chapters. These processes require thorough analytical evaluations to determine the appropriate energy-saving measures. This chapter provides some examples. In this chapter the authors present a suggested ...
Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation ...
The high-purity-oxygen activated sludge process will be used to expand secondary treatment capacity and improve water quality in Santa Monica Bay. The facility is operated by the city of Los Angeles Department of Public Works` Bureau of Sanitation. The overall Hyperion Full Secondary Project is 30% complete, including a new headworks, a new primary clarifier battery, an electrical switch yard, and additional support facilities. The upgrading of secondary facilities is 50% complete, and construction of the digester facilities, the waste-activated sludge thickening facility, and the second phase of the three-phase modification to existing primary clarifier batteries has just begun. The expansion program will provide a maximum monthly design capacity of 19,723 L/s(450 mgd). Hyperion`s expansion program uses industrial treatment techniques rarely attempted in a municipal ...
This executive summary presents an overview of the investigations, findings, conclusions, and recommendations of the Long Island Regional Planning Board (LIRPB) study of the Potential for Beneficial Use of Waste-to-Energy Facility Ash. The full report consists of the following volumes: Executive Summary; Volume 1: Long Island Ash Management Status; Volume 2: Sampling and Testing Procedures; Volume 3: Environmental Properties; Volume 4: Engineering Properties; Volume 5: Environmental Assessment; Volume 6: Engineering and Economic Evaluation; and Volume 7: Legal and Institutional Issues. Volumes one through seven are briefly summarized in this executive summary with the exception of Volume 2 of the report, which serves as the documentation of the sampling conditions and testing methods used in measuring chemical and physical properties of the ash tested. The study investigated the feasibility of the use of incinerator ash as a substitute for natural aggregate in ...
High energy physics is a basic research domain with a well established European and international cooperation. Cooperation can be of different type depending on the size of the facilities involved (accelerators), on their financing, and on the type of experiments that use these facilities. The CERN, the European center for nuclear research, created in October 1954, is the best example of such a cooperation. This article examines first the juridical and scientifical structure of the CERN and the mode of organization of big experiments. Then, it presents the role of international committees in the establishment of a common scientific policy in Europe and in the rest of the world. Finally, the possible future evolution of the CERN towards a worldwide project is evoked. (J.S.)
Surveillance and maintenance (S & M) of 75 sites were conductd by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals. S & M activities on these sites were conducted from the end of their operating life until finalfacility disposal or site stabilization. The objectives of the Waste Area Grouping S & M Program are met by maintaining a program of routine S & M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program`s activities and includes tables indicating tank levels and dry well data for FY 1991.
Surveillance and maintenance (S M) of 75 sites were conductd by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals. S M activities on these sites were conducted from the end of their operating life until finalfacility disposal or site stabilization. The objectives of the Waste Area Grouping S M Program are met by maintaining a program of routine S M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program's activities and includes tables indicating tank levels and dry well data for FY 1991.
This paper addresses the stability aspects of several successful dc superconducting magnets such as large bubble chamber magnets, and magnets for the Mirror Fusion Test Facility and MHD Research Facility. Specifically, it will cover Argonne National Laboratory 12-Foot Bubble Chamber magnets, the 15-foot Bubble Chamber magnets at Fermi National Laboratory, the MFTF-B Magnet System at Lawrence Livermore National Laboratory, the U-25B Bypass MHD Magnet, and the CFFF Superconducting MHD magnet built by Argonne National Laboratory. All of these magnets are cooled in pool-boiling mode. Magnet design is briefly reviewed. Discussed in detail are the adopted stability critera, analyses of stability and disturbance, stability simulation, and the final results of magnet performance and the observed coil disturbances.
The paper describes the latest developments in STRASSY (Strategy Assistance System), the strategy assistance system for the inspection of nuclear materials. The user can now select the fuel cycle he wishes to investigate from an initial range of 19 facilities. An inspection interface has been developed to enable the details and dates of inspections to be modified. One of the special features of the application of STRASSY in international safeguards is the taking into account of timeliness of detection; certain aspects of the time manager algorithms are presented and analysed, including the guaranteed existence of a solution. The results of a study of diversion paths in a simplified cycle consisting of our facilities are presented. Finally, the modifications necessary to enable STRASSY to be used for a posterior analysis of inspection results are discussed. (authors). 7 refs., 3 figs.
This report is a description of the West Valley Demonstration Project`s radioactive waste storage facility, the Chemical Process Cell (CPC). This facility is currently being used to temporarily store vitrified waste in stainless steel canisters. These canisters are stacked two-high in a seismically designed rack system within the cell. Approximately 300 canisters will be produced during the Project`s vitrification campaign which began in June 1996. Following the completion of waste vitrification and solidification, these canisters will be transferred via rail or truck to a federal repository (when available) for permanent storage. All operations in the CPC are conducted remotely using various handling systems and equipment. Areas adjacent to or surrounding the cell provide capabilities for viewing, ventilation, and equipment/component access.
The modeling methods used to compute the neutron-induced activation of target and near-target materials in the NIF facility are presented. A detailed space and energy description of the neutron environment in the different materials is provided. A new capability has been developed to treat in a general way the activation of debris produced in an operational regime of yield and no-yield experiments. First calculations are addressed to analyze the activity of the debris into the target chamber. The contribution of the different components to activity, interior dose rates, and waste disposal rating (WDR) is determined. The importance of the activation coming from primary irradiation in the target, and from secondary irradiation in debris deposited onto the first wall is assessed. Finally, waste hazards of the activated debris when removed out of the chamber and stored are analyzed. (authors)
This purpose of this report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period April 1, 2005 through June 30, 2005. The following tasks have been completed. First, the new Combustion Laboratory was occupied on June 15, 2005, and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building is in the final painting stage. Second, the fabrication and manufacturing contract for the CFBC Facility was awarded to Sterling Boiler & Mechanical, Inc. of Evansville, Indiana. Sterling is manufacturing the assembly and component parts of the CFBC system. The erection of the CFBC system is expected to start September 1, 2005. Third, mercury emissions from the cofiring of coal and chicken waste was studied experimentally in the laboratory-scale simulated ...
The overall purpose of this research was to evaluate the independent and interactive effects of elevated levels of CO{sub 2} and O{sub 3} on tree leaf litter quality and decomposition. This research was conducted at the Aspen FACE (Free Air CO{sub 2} Enrichment) facility near Rhinelander, Wisconsin. This research comprised one facet of a larger project assessing how CO{sub 2} and O{sub 3} pollutants will alter carbon sequestration and nutrient cycling in north temperate forest ecosystems.
We consider a serial supply chain consisting of a raw material supplier, a manufacturer, a distribution centre and a retailer in the presence of time-varying delivery between manufacturer facility and the retailer warehouse. Delivery time functions are developed based on practical data analysis and the cost models for both linear and non-linear delivery time functions are derived. Analytic solution for system with linear delivery times is derived and a search algorithm for system with non-linear delivery times is established. Finally, sensitivity analysis is made to help decision makers achieve a lower total cost in practice.
Effects of the rapid early-in-life expansion of metal fuel were measured in an irradiation experiment in the Fast Flux Test Facility (FFTF). This important performance/design information was obtainable through the unique combination of a dimensionally stable FFTF oxide core and the calibrated proximity instrumentation associated with the test. These results delineate the time dependence of metal-fuel swelling and provide quantitative estimates of the magnitude of axial fuel swelling in full-length metal-fuel assemblies. Final posttest examination results will define actual fuel column growth levels.
Remote-controlled handling systems are required for work to be done in the decommissioning and dismantling of nuclear facilities. These systems are equipped with electronic devices suitable for use in working environments affected by ionizing radiation. The publication explains the step-wise progress achieved for improving the radiation resistance of electronic devices with the example of a four-quadrant controlling device for the motors of a manipulator. The radiation resistance of the device could be enhanced to radiation energies of 5.500 Gy. This means that a manipulator vehicle equipped with this controlling device can take up to approx. 15 kGy all in all, taking into account its own shielding properties. (DG).
The Fast Flux Test Facility near Richland, Washington, utilizes computer control for reactor refueling and other related core component handling and processing tasks. The computer controlled tasks described in this paper include core component transfers within the reactor vessel, core component transfers into and out of the reactor vessel, remote duct measurements of irradiated core components, remote duct cutting, and finally, transferring irradiated components out of the reactor containment building for off-site shipments or to long term storage. 3 refs., 16 figs.
The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental ...
A couple of domestic institutions have been investigating the application of vitrification technology to treat low- and intermediate-level radioactive wastes in Korea. In the case that such investigations prove to be successful, it is expected that commercial vitrification plants will be constructed. The safety insuring on vitrification plants could not be compatible with criterion on radioactive waste management because the facilities are at high temperature and contain a variety of accommodations for the exhaust gases and residual products. Therefore, it is necessary to suggest a new strategy or modifications of criterion of radioactive waste management on considerations related with the vitrification technology. In order to ensure the safety of vitrification plants, a technical guideline or standard for design and operation of vitrification plants must be established too. A study on the safety assessment of vitrification plants in consideration with general ...
This study evaluates the degree to which surface impoundments at licensed facilities comply with significant changes in NRC requirements initiated by enactment of EPA's final environmental standards for uranium recovery facilities (40 CFR Part 192). Impoundment liner requirements, ground-water protection standards, ground-water monitoring and corrective action programs, and site closure standards are the most significant regulatory modifications. The compliance status of 30 conventional mills and 31 in-situ mines is determined from a review of Nuclear Regulatory Commission and agreement state docket files through November, 1983. Results of this review show that a majority of conventional uranium mill tailings management systems are deficient with respect to liner requirements for new impoundments or proposed expansions to existing impoundments, as well as with respect to some aspects of ground-water monitoring and ...
The Plutonium Finishing Plant (PFP) previously known as the Plutonium Process and Storage Facility, or Z-Plant, was built and put into operation in 1949. Since 1949 PFP has been used for various processing missions, including plutonium purification, oxide production, metal production, parts fabrication, plutonium recovery, and the recovery of americium (Am-241). The PFP has also been used for receipt and large scale storage of plutonium scrap and product materials. The PFP Final Safety Analysis Report (FSAR) was prepared by WHC to document the hazards associated with the facility, present safety analyses of potential accident scenarios, and demonstrate the adequacy of safety class structures, systems, and components (SSCs) and operational safety requirements (OSRs) necessary to eliminate, control, or mitigate the identified hazards. Documented in this Safety Evaluation Report (SER) is DOE`s independent review and evaluation ...
In this report, the descriptions of the DIVA test facility and those test matrixes are presented. The test sections simulate the downcomer annulus of DVI system with various scalling methodologies. The UPTF one has 1/7.5 scale and the APR-1400 test sections are reduced in 1/7 scale and 1/5 scale respectively. Also, the instrumentations, measuring methods are described. The major measuring parameters are ECC injection rate, air injection rate, bypass fraction, system pressure and so on. And finally, the operation procedure and experimental steps are introduced. From the DIVA tests, the multi-dimensional behaviors of two-phase flow in the downcomer during the reflood phase can be investigated using a transparent test facility. Also comparing the experimental data which are performed in various scale downcomer, it is expected that some criteria of scalling methodology proper to the DVI system can be derived. 10 refs., 19 ...
A small break LOCA event simulation with no high pressure injection system available, known as International Atomic Energy Agency Standard Problem Exercise no. 4 (IAEA-SPE-4), was performed on the PMK-2 integral test facility in Budapest in 1993. This paper analyses the response of the PMK-2 facility, a model of VVER-440 nuclear power plant, using the latest released version MOD3.2.1.2 of the RELAP5 thermal-hydraulic code. After several years of the SPE-4 experiment analyses, many problems have emerged and been studied. Main goal of the present analyses was to study the main influencing parameters for adequate modelling of the hexagonal core channel with 19-rod bundle and phenomena during the core uncovery. Some influencing parameters have been identified, mostly on the primary side, but some also on the secondary side. This is exact simulation of main coolant pump coast down, hydro-accumulators water temperature and connections to the primary ...
Liquid high-level nuclear waste will be immobilized at the Savannah River Site (SRS) by vitrification in borosilicate glass. The glass will be produced and poured into stainless steel canisters in the Defense Waste Processing Facility (DWPF). Eventually these canistered waste forms will be sent to a geologic repository for final disposal. In order to assure acceptability by the repository, the Department of Energy has defined requirements which DWPF canistered waste forms must meet. These requirements are the Waste Acceptance Preliminary Specifications (WAPS). The WAPS require DWPF to identify the crystalline phases expected to be present in the final glass product. Knowledge of the thermal history of the borosilicate glass during filling and cooldown of the canister is necessary to determine the amount and type of crystalline phases present in the final glass product. Glass samples of seven projected ...
ENEA (Italian National Agency for New Technologies, Energy and the Environment) is conducting a large research and development programme on innovative vehicles with high energy efficiency and low environmental impact. In particular conducts activities on electric and hybrid vehicles. Testing and evaluation activities play a strong role in this programme. A complete characterization chain has been then defined and set up with a network of facilities which covers main testing needs for single components, subsystems and complete vehicles, in simulated and real operating conditions. The test facility which has been realised is able to experiment and fully characterise complete drive-trains (and subsystems) for pure electric and hybrid vehicles. It is composed by a different section for each subsystem: 1) power generation; 2) energy storage and management; 3) driving motors. Each section acts as an experimental island, able to operate alone or ...
This report describes progress made during the extended final year (April 1, 1992 to December 31, 1993) and summarizes the accomplishments of the entire three-year period (April 1, 1990 through December 31, 1993) of the current US Department of Energy grant DE-FG06-87ER40345. This work is carried out primarily at the UNISOR (University Isotope Separator at Oak Ridge) facility of the Holifield Heavy-Ion Research Facility of the Oak Ridge National Laboratory. The primary mission of this work is the study of the structure and properties of nuclei far from stability through on-line nuclear orientation using the UNISOR Nuclear Orientation Facility, a helium dilution refrigerator coupled on-line to the UNISOR mass separator. The author`s group was one of the original proposers of this facility and played a central role in its design, construction, and development. The structure of nuclei ...
A Lawrence Livermore National Laboratory (LLNL) Management Pre-Start Review (MPR) Team was formed to independently verify the operational readiness of Building 368 (B368) Biosafety Level III (BSL-3) Facility to conduct research with biological pathogens and toxins including those considered Select Agents. Review objectives and criteria were developed from the DOE/NNSA and LLNL requirements. These were provided in the Implementation Plan for the Biosafety Level III (BSL-3) Facility Management Pre-Start Review (BSL-3 MPR) at Lawrence Livermore National Laboratory that was reviewed and approved by DOE/NNSA-LSO. The formal part of the LLNL MPR for the BSL-3 Facility was begun in August of 2005 but work on the MPR was stopped in October of 2005 due to the need for LLNL to reassess organizational and operational controls and respond to Centers for Disease Control and Prevention inquiries related to a shipping incident involving ...
The 9/11 event in the U.S.A has increased international terror possibilities against nuclear facilities including nuclear power plants(NPPs). It is necessary to assess the performance of an existing physical protection system(PPS) at nuclear facilities based on such malevolent acts. A PPS is a complex configuration of detection, delay, and response elements. Several methods are available to analyze a PPS and evaluate its effectiveness. Sandia National Laboratory(SNL) in the USA was developed a System Analysis of Vulnerability to Intrusion (SAVI) computer code for this purpose. It is powerful software for evaluating the effectiveness of PPS against outsider threats. This study presents the performance assessment of the PPS at Wolsung NPP using SAVI code. First, the site-specific Adversary Sequence Diagrams(ASDs) of the PPS is constructed. It helps to understand the functions of the existing PPS composed of physical areas and Protection ...
The 9/11 event in the U.S.A has increased international terror possibilities against nuclear facilities including nuclear power plants(NPPs). It is necessary to assess the performance of an existing physical protection system(PPS) at nuclear facilities based on such malevolent acts. A PPS is a complex configuration of detection, delay, and response elements. Several methods are available to analyze a PPS and evaluate its effectiveness. Sandia National Laboratory(SNL) in the USA was developed a System Analysis of Vulnerability to Intrusion (SAVI) computer code for this purpose. It is powerful software for evaluating the effectiveness of PPS against outsider threats. This study presents the performance assessment of the PPS at Wolsung NPP using SAVI code. First, the site-specific Adversary Sequence Diagrams(ASDs) of the PPS is constructed. It helps to understand the functions of the existing PPS composed of physical areas and Protection ...
We obtained the ratios of {sup 134}Cs/{sup 137}Cs and {sup 154}Eu/{sup 137}Cs in spent PWR fuels with gamma scanning equipment of irradiated material examination facility. The fuel segments, of which the burn-up is about 40 GWD/MTU and its cooling time is 8.4 years, are prepared in Post Irradiated Examination Facility and transported to IMEF. By considering of multi-peaks of {sup 134}Cs and {sup 154}Eu, we obtained the relative efficiency of the gamma scanning system as a function of energy. And finally we obtained the number ratios of radioactive nuclides in 72 fuel pellets, radioactive {sup 134}Cs/{sup 137}Cs and {sup 154}Eu/{sup 137}Cs. (author). 4 refs., 27 tabs., 28 figs.
We obtained the ratios of "1"3"4Cs/"1"3"7Cs and "1"5"4Eu/"1"3"7Cs in spent PWR fuels with gamma scanning equipment of irradiated material examination facility. The fuel segments, of which the burn-up is about 40 GWD/MTU and its cooling time is 8.4 years, are prepared in Post Irradiated Examination Facility and transported to IMEF. By considering of multi-peaks of "1"3"4Cs and "1"5"4Eu, we obtained the relative efficiency of the gamma scanning system as a function of energy. And finally we obtained the number ratios of radioactive nuclides in 72 fuel pellets, radioactive "1"3"4Cs/"1"3"7Cs and "1"5"4Eu/"1"3"7Cs. (author). 4 refs., 27 tabs., 28 figs.
Maps transformed so as to have constant density of residential population were used to analyze the spatial distribution of disease in three specific areas. Each area had received recent attention because of suspected environmental pollution. The area adjacent to the Rocky Flats Facility (CO) was examined to identify any association between possible plutonium releases and increases in lung cancer or leukemia incidence. The industrial area of northern Contra Costa County (CA) was studied to explore a relationship between petrochemical industrial emissions and histologic-specific lung cancers. Finally, a suspected increase in the risk of congenital cardiac defects possibly related to pollution of the Santa Clara County (CA) water supply was investigated. No evidence of elevated risk of disease was found to be associated with either the Rocky Flats Facility or the polluted water of Santa Clara County. An increase in lung ...
This report contains the results of the Photovoltaic (PV) Industry Manufacturing Technology Assessment performed by the Automation and Robotics Research Institute (ARRI) of the University of Texas at Arlington for the National Renewable Energy laboratory. ARRI surveyed eleven companies to determine their state-of-manufacturing in the areas of engineering design, operations management, manufacturing technology, equipment maintenance, quality management, and plant conditions. Interviews with company personnel and plant tours at each of the facilities were conducted and the information compiled. The report is divided into two main segments. The first part of the report presents how the industry as a whole conforms to ``World Class`` manufacturing practices. Conclusions are drawn from the results of a survey as to the areas that the PV industry can improve on to become more competitive in the industry and World Class. Appendix A contains the questions asked in the ...
The 9/11 event in the U.S.A has increased international terror possibilities against nuclear facilities including nuclear power plants(NPPs). It is necessary to assess the performance of existing physical protection system(PPS) at nuclear facilities based on such malevolent acts. A PPS is a complex configuration of detection, delay, and response elements. Several techniques are available to analyze a PPS and evaluate its effectiveness. Sandia National Laboratory(SNL) in the USA was developed a System Analysis of Vulnerability to Intrusion (SAVI) computer code for this purpose. It is powerful software for evaluating the effectiveness of PPS against outsider threats. This study presents the performance assessment of the PPS at Wolsong NPP using SAVI code. The first is that the SAVI constructs the site-specific Adversary Sequence Diagram (ASD) of the PPS. This provides a methods of graphically representing the PPS composed of physical areas and ...
Although the Federal Facility Agreement (FFA) addresses the entire Oak Ridge Reservation, specific requirements are set forth for the liquid low-level radioactive waste (LLLW) storage tanks and their associated piping and equipment, tank systems, at ORNL. The stated objected of the FFA as it relates to these tank systems is to ensure that structural integrity, containment and detection of releases, and source control are maintained pending final remedial action at the site. The FFA requires that leaking LLLW tank systems be immediately removed from service. It also requires the LLLW tank systems that do not meet the design and performance requirements established for secondary containment and leak detection be either upgraded or replaced. The FFA establishes a procedural framework for implementing the environmental laws. For the LLLW tank systems, this framework requires the specified plans and schedules be submitted to EPA and TDEC for ...
Tanker-based floating production, storage, and offloading (FPSO) systems have been in operation since Aug. 1977, when a single-well FPSO facility was put into production by Shell Espana in the Mediterranean. The overall operational experience with this system at this field is reviewed, with special attention to the wireline workover facilities, which have proved very satisfactory. A subsequent evolutionary step, a FPSO system accommodating multiple wells, necessitated development of a multibore fluid swivel. A design program for this swivel was initiated in 1978; a prototype was built and full-scale testing finalized in 1980. A summary of the test results is presented. Simultaneously with the multibore swivel development, detailed engineering for an eight-well FPSO unit was begun. This system includes gas-lift and water injection capabilities. Provisions for through-flowline (TFL) well workover can be incorporated. The ...
The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army. After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, Texas, LSAAP encompasses ...
The personal neutron dosimetry becomes more important with the increasing use of nuclear and accelerator facilities. The solid state track detector, film badge and thermo-luminescent dosimeter have widely been used as passive-type personal neutron dosimeters, but the real-time neutron dosimeter is strongly needed. A real time personal dosimeter which could give neutron dose equivalent over wide energy range from thermal to 10 odd MeV by using two neutron sensors has been developed by our group. For practical commercial product, some changes from these prototype sensors have recently been done by Fuji Electric Co. Ltd. The purpose of this work is the final performance test of the dosimeter just before sale. We checked again about the sensitivity in the monoenergetic neutron field from 8 keV to 15 MeV and in the neutron fields around a few accelerator facilities. (author)
The ability to test advanced fuels and cladding materials under reactor operating conditions in the United States is limited. The Oak Ridge National Laboratory (ORNL) High Flux Isotope Reactor (HFIR) and the newly expanded post-irradiation examination (PIE) capability at the ORNL Irradiated Fuels Examination Laboratory provide unique support for this type of advanced fuel/cladding development effort. The wide breadth of ORNL's fuels and materials research divisions provides all the necessary fuel development capabilities in one location. At ORNL, facilities are available from test fuel fabrication, to irradiation in HFIR under either thermal or fast reactor conditions, to a complete suite of PIEs, and to final product disposal. There are very few locations in the world where this full range of capabilities exists. New testing capabilities at HFIR have been developed that allow testing of advanced nuclear fuels and cladding materials ...
Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are ...
Corrective Action Unit (CAU) No. 92, the Area 6 Decontamination Pond Facility (DPF), is an historic disposal unit located at the Nevada Test Site (NTS) in Nye County, Nevada (Figures 1 - 1, 1-2, and 1-3). The NTS is operated by the U.S. Department of Energy, Nevada Operations Office (DOE/NV), which has been required by the Nevada Division of Environmental Protection (NDEP) to characterize the DPF under the requirements of the Resource Conservation and Recovery Act (RCRA) Part A Permit (NDEP, 1995) for the NTS and Title 40 Code of Federal Regulations (CFR) Part 265 (1996c). The DPF is prioritized in the Federal Facility Agreement and Consent Order (FFACO, 1996) but is governed by the permit. The DPF was characterized through sampling events in 1994, 1996, and 1997. The results of these sampling events are contained in the Final Resource Conservation and Recovery Act Industrial Site Environmental Restoration Site ...
For prolonged storage and eventual disposal radioactive wastes will be solidified to reduce the problems which accompany liquid waste whilst solid wastes will be encapsulated in an immobilising matrix. In the solidification and encapsulation process it will be important to produce a material in a form which is chemically stable, mechanically strong and which will not react with or allow free passage of groundwater. To this end a continuous check will be required to ensure that the various wastes are chemically compatible with the solidifying and binding matrices and that the associated processes are performed against a strict Quality Programme. The Quality Programme will be extensive requiring the specification of procedures for assessing the quality and nature of the wastes, the detailed operation of the solidification and/or encapsulation, the overpack requirements for transportation and the routines to be adopted with respect to storage or final disposal in the ...
Radiation damage of the final optical components in an Inertial Confinement Fusion (ICF) reactor is a crucial issue for development of a laser-fusion reactor. To some extent, this problem will be encountered in the National Ignition Facility (NIF), but there, the integrated radiation dose will be considerably less than that encountered in a future reactor. This extremely harsh radiation environment necessitates shielding the ICF optics from direct neutron and x-ray bombardment. Several approaches have been suggested, such as the use of grazing incidence metal mirrors or fused silica wedge deflectors. While metal mirrors can withstand a larger radiation dose, their focusing qualities pose problems. Therefore wedge deflectors, originally suggested by Lawrence Livermore National Laboratory (LLNL) staff, represent a promising alternative. Radiation hardening of the fused silica deflectors using a new combined thermal/optical annealing approach is ...
The purpose of this study is to analyze the safeties and the economics for Co-60 production from Wolsung PHWR and to verify the feasibility on the manufacturing of the final Co-60 source for industrial irradiation. The feasibility of reactor conversion was carried out with KEPCO collaboration. Through the site survey on the experience of Gentililly-2 in Canada, a feasibility of plant conversion, changes in design, equipment and tools for Co-60 production was verified. It was estimated that the reactor conversion would not impose adverse impact on plant safety. For the encapsulation of radiation source and storage of the final products, a modification of concrete hot cell at KAERI was primary concerns. The installation and improvement of facilities are needed to avoid cross contamination and extra radiation exposure. Main items for these are pressure gauge, separated HEPA filter the ceiling separation, extra-shielding and ...
Coal can be converted to liquid fuels via three generically defined technologies: pyrolysis, direct hydroliquefaction, and indirect liquefaction. This paper presents a general overview of the indirect liquefaction technology and a discussion of processes tht are commercially available as well as those in the development stage. Finally, the objective of the DOE research and development program in conversion of synthesis gas derived from coal to transportation fuels is summarized. The current outlook for indirect liquefaction is encouraging. New facilities are being built in South Africe and New Zealand, and commercial plants could be designed and built for operation in the United States using proven technology. At the same time, developments in gasification as well as liquefaction catalysts and reactor technology promise significant improvements in indirect liquefaction processes in the years to come.
This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of research done in the third phase of a research project that investigated components for small heat pump systems that use ammonia as a working fluid. The report includes a summary of the findings of the first two phases of the project and goes on to describe tests done with rotary vane and scroll compressors. The aims of the project are discussed and the work done is listed chronologically. The construction and the components of the test installation are described in detail. Also, the heat pump testing facilities at the University of Applied Science in Rapperswil, Switzerland, are described. The results of the measurements made for various temperature gradients are presented in detail and commented on; also, the various types of compressor tested and other heat pump compressors are compared.
The Soviet Union does not currently have an overall radioactive waste management program or national laws that define objectives, procedures, and standards, although such a law is being developed, according to the Soviets. Occupational health and safety does not appear to receive major attention as it does in Western nations. In addition, construction practices that would be considered marginal in Western facilities show up in Soviet nuclear power and waste management operations. The issues involved with radioactive waste management and environmental restoration are being investigated at several large Soviet institutes; however, there is little apparent interdisciplinary integration between them, or interaction with the USSR Academy of Sciences. It is expected that a consensus on technical solutions will be achieved, but it may be slow in coming, especially for final disposal of high-level radioactive wastes and environmental restoration of ...
The Soviet Union does not currently have an overall radioactive waste management program or national laws that define objectives, procedures, and standards, although such a law is being developed, according to the Soviets. Occupational health and safety does not appear to receive major attention as it does in Western nations. In addition, construction practices that would be considered marginal in Western facilities show up in Soviet nuclear power and waste management operations. The issues involved with radioactive waste management and environmental restoration are being investigated at several large Soviet institutes; however, there is little apparent interdisciplinary integration between them, or interaction with the USSR Academy of Sciences. It is expected that a consensus on technical solutions will be achieved, but it may be slow in coming, especially for final disposal of high-level radioactive wastes and environmental restoration of ...
An Oil Shale Mining Economic Model (OSMEM) was developed and executed for mining scenarios representative of commercially feasible mining operations. Mining systems were evaluated for candidate sites in the Piceance Creek Basin. Mining methods selected included: (1) room-and-pillar; (2) chamber-and-pillar, with spent shale backfilling; (3) sublevel stopping; and (4) sublevel stopping, with spent shale backfilling. Mines were designed to extract oil shale resources to support a 50,000 barrels-per-day surface processing facility. Costs developed for each mining scenario included all capital and operating expenses associated with the underground mining methods. Parametric and sensitivity analyses were performed to determine the sensitivity of mining cost to changes in capital cost, operating cost, return on investment, and cost escalation.
This report, the eighth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1992. A special emphasis on accomplishments in nuclear power plant aging research reflects recognition that a number of plants are entering the final portion of their original 40-year operating licenses and that, in addition to current aging effects, a focus on safety considerations for license renewal becomes timely. The primary purpose of performing regulatory research is to develop and provide the Commission and its staff with the technical bases for regulatory decisions on the safe operation of licensed nuclear reactors and facilities, to find unknown or unexpected safety problems, and to develop data and related information for the purpose of revising the Commission`s rules, regulatory guides, or ...
This report, the eighth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1992. A special emphasis on accomplishments in nuclear power plant aging research reflects recognition that a number of plants are entering the final portion of their original 40-year operating licenses and that, in addition to current aging effects, a focus on safety considerations for license renewal becomes timely. The primary purpose of performing regulatory research is to develop and provide the Commission and its staff with the technical bases for regulatory decisions on the safe operation of licensed nuclear reactors and facilities, to find unknown or unexpected safety problems, and to develop data and related information for the purpose of revising the Commission's rules, regulatory ...
This paper presents an assessment of recent improvements in the technology for direct coal liquefaction on the estimated commercial economics. The basis for the design and cost estimates is a series of studies sponsored by Amoco Corporation and Electric Power Research Institute, which were derived from the highly detailed Breckinridge Project, completed in the early 1980s under DOE sponsorship. The technology, design, and cost estimates reflect the current two-stage liquefaction technology practiced at the Advanced Coal Liquefaction Research facility in Wilsonville, Alabama. Details of the design bases and cost estimates and how they compare with the original Breckinridge study are described. Also examined are effects of feed coal rank, product slate, and the source of hydrogen (natural gas or coal) on the costs. Finally, the ways that projected future improvements in the technology will change the design and lead to lower costs are discussed. ...
The Fast Flux Test Facility (FFTF) is a liquid-metal-cooled fast reactor, which is designed to test a variety of different structural and fuel materials. A safety analysis is performed for each experiment that is irradiated in FFTF. The FFTF final safety analysis report (FSAR) assumed that all driver fuel assemblies would maintain cladding integrity during normal operations and all design transients. Maintenance of cladding integrity retains three barriers to any fission gas release to the public and also prevents any potential contact between the fuel and coolant. Experiments are, in general, expected to meet the same criterion. Selected experiments can, however, be classified as run-to-cladding-breach experiments (RTCB). The purpose of this paper is to describe alternative acceptance criteria for RTCB experiments that they feel provide protection equivalent to the maintenance of cladding integrity.
Tanker-based floating production, storage and offloading (FPSO) systems have been in operation since Aug. 1977, when a single-well FPSO was put into production by Shell Espana in the Mediterranean. The overall operational experience with this system at this field is reviewed. Special attention is directed to the wireline workover facilities which have proven to be satisfactory. A subsequent evolutionary step, a FPSO accommodating multiple wells, necessitated development of a multiple-bore product swivel. A design program for this swivel was initiated in 1978, a prototype was built and fullscale testing finalized in 1980. A summary of the test results is presented. Simultaneous with the multiple-bore swivel development, detailed engineering for an 8-well FPSO was begun. This sytem includes gas lift a
Often oil/gas and other hydrocarbons discovered and produced offshore are transported to onshore facilities via submarine pipelines. The route of such pipelines traverses through coastal/shore approach regions. For a rational/economic design, safe installation and subsequent operation it is of utmost importance to review, evaluate and finalize various environmental hazard such as winds, waves, currents, seabed topography, seabed and sub-bottom soils, seabed erosion and soil accretion. This paper addresses the above described environmental hazards, their assessment and techniques to prepare design parameters which must be used for stability analysis, installation methods, long term operation and maintenance for the shore approaches. Additionally, various proven pipeline installation and stabilization techniques for the shore approach region are detailed. As case histories, three approaches installed in the Dutch North Sea are described.
This environmental assessment quantifies the water quality-related benefits for Transportation Equipment Cleaning (TEC) facilities based on site-specific analyses of current conditions and the conditions that would be achieved by process changes under proposed BAT (Best Available Technology) and PSES (Pretreatment Standards for Existing Sources) controls. The US Environmental Protection Agency (EPA) estimated instream pollutant concentrations for 157 priority and nonconventional pollutants from three subcategories (barge-chemical and petroleum, rail-chemical, and truck-chemical) of direct and indirect discharges using stream dilution modeling. The potential impacts and benefits to aquatic life are projected by comparing the modeled instream pollutant concentrations to published EPA aquatic life criteria guidance or to toxic effect levels.
This Energy Savings Opportunity Survey (ESOS) is to identify Energy Conservation Opportunities (ECO`s) which are practical and economical for the reduction of energy consumption in accordance with the Army Facilities Energy Plan. The work to be performed under this project includes: (A) Coordinating with the on-going and proposed related projects. (B) Conducting a limited site survey required to identify applicable ECO`s and obtaining necessary data to evaluate the ECO`s. (C) Evaluating applicable ECO`s to determine their feasibility in accordance with current criteria. (D) Preparing programming and implementation documents for the recommended ECO`s. and (E) Preparing a comprehensive report to present the work performed including energy analysis, the results, and recommendations.
The production of the {lambda}- and {sigma}{sup 0}-hyperons has been measured via the pp{yields}pK{sup +}{lambda}/{sigma}{sup 0} reaction at the internal COSY-11 facility in the excess energy range between 14 and 60 MeV. The transition of the {lambda}/{sigma}{sup 0} cross-section ratio from about 28 at Q{<=}13 MeV to the high-energy level of about 2.5 is covered by the data showing a strong decrease of the ratio between 10 and 20 MeV excess energy. Effects from the final-state interactions in the p-{sigma}{sup 0} channel seem to be much smaller than in the p-{lambda} channel. Estimates of the effective range parameters are given for the N{lambda} and the N{sigma} systems. (orig.)
This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period October 1, 2004 through December 31, 2004. The following tasks have been completed. First, the renovation of the new Combustion Laboratory and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building have proceeded well. Second, the detailed design of supporting and hanging structures for the CFBC was completed. Third, the laboratory-scale simulated fluidized-bed facility was modified after completing a series of pretests. The two problems identified during the pretest were solved. Fourth, the carbonization of chicken waste and coal was investigated in a tube furnace and a Thermogravimetric Analyzer (TGA). The experimental results from this study are presented in this report. Finally, ...
Development testing has been conducted by Rockwell Hanford Operations (Rockwell) with simulated Fast Flux Test Facility (FFTF) Reactor fuel and unirradiated N-Reactor fuel, to identify the various problems associated with rotary shearing these fuels. This report discusses the results of tests segmenting FFTF and N-Reactor fuels using electrically driven slow-speed rotary shredders. From these tests, it has been determined that slow-speed rotary shredding of both fuels can be accomplished. Final equipment arrangements and operating parameters have been established for definitive design of the FFTF Rotary Shear. Development testing is continuing on the N-fuel rotary shear. However, it has been established that two-stage shearing is necessary and the outer N-fuel elements pose few problems, while the smaller inner elements have created numerous problems, which are being addressed.
This comprehensive final report for the Swiss Federal Office of Energy (SFOE) examines ways to optimise energy flows in mains networks that include distributed generation facilities. Increasing use of decentralised generation, its effects on the operation of low-voltage mains and the efficient use of the 400 V mains is discussed. The principles of operation and construction of controlled storage installations are discussed and concrete examples of their use in both grid-connected and island operation are quoted. Alternatives to storage are looked at from both the technical and economic points of view. The storage technologies used such as flywheels, supercaps, redox-flow batteries and lead-acid accumulators are briefly assessed and the results of simulations are discussed.
Both the KRW fluidized-bed gasifier and the transport gasifier case studies were used for this assessment. The transport technology is a high-velocity circulating fluidized-bed reactor currently under development by The M.W. Kellogg Company. In the earlier assessment, seven design concepts or cases were identified; a process design was developed; major equipment items were identified; estimates of capital cost, operation and maintenance cost, and cost of electricity were developed; reliability was predicted; and development issues were identified for six studies. Three of the most probable cases were further evaluated for a Greenfield assessment in this report to adequately determine all costs independent of facilities at Plant Wansley.
The goal of this investigation is to research possible methodologies into automating the design of, specifically, nuclear power facilities; however, it is relevant to all thermal power systems. The strategy of this research has been to concentrate on individual areas of the thermal design process, investigate procedures performed, develop methodology to emulate that behavior, and prototype it in the form of a computer program. The design process has been generalized as follows: problem definition, design definition, component selection procedure, optimization and engineering analysis, testing and final design with the problem definition defining constraints that will be applied to the selection procedure as well as design definition. The result of this research is a prototype computer program applying an original procedure for the selection of the best set of real components that would be used in constructing a system with desired performance ...
Prompted by a $10 million Congressional allocation to identify supplemental actions to protect the Columbia River from groundwater contamination beneath the Hanford Reservation, the U. S. Department of Energy (DOE) Environmental Management (EM) Office of Clean-up Technology identified twenty-three potential technical projects and then down-selected ten of these for further evaluation. An independent expert peer review was conducted for the ten down-selected proposals. The review panel consisted of twenty-three recognized subject matter experts that broadly represented academia, industry, and federal laboratories. Of the initial ten proposals reviewed, one was given unconditional support, six were given conditional support, and three were not supported as proposed. Three additional proposals were then submitted by DOE for review--these proposals were structured, in part, to respond to the initial round of technical peer review comments. Peer reviews of these additional proposals ...
During third quarter 1994, samples from AMB groundwater monitoring wells at the Metallurgical Laboratory Hazardous Waste Management Facility (Met Lab HWMF) were analyzed for selected heavy metals, indicator parameters, radionuclides, volatile organic compounds, and other constituents. Eight parameters exceeded standards during the quarter. As in previous quarters, tetrachloroethylene and trichloroethylene exceeded final Primary Drinking Water Standards (PDWS). Bis(2-ethylhexyl) phthalate exceeded final PDWS in one well. Aluminum, iron, manganese, tin, and total organic halogens exceeded the Savannah River Site (SRS) Flag 2 criteria. Groundwater flow direction and rate in the M-Area Aquifer Zone were similar to previous quarters. Conditions affecting determination of groundwater flow directions and rates in the Upper Lost Lake Aquifer Zone, Lower Lost Lake Aquifer Zone, and the Middle Sand Aquifer Zone of the Crouch Branch ...
This Executive Summary, Volume I, of the lower Flathead System Fisheries Study Final Report, was prepared to provide a study overview for persons who are not fisheries scientists. The contents provide an introduction to the study and its objectives, a short description of the study area, a discussion of the major findings and conclusions of the study, and the description of fisheries management alternatives available to managers of the lower Flathead system. Technical reports were prepared for those portions of the study dealing with the lower Flathead River and its tributaries, Volume II, and the South Bay of Flathead Lake, Volume III. The annual hydrographic regime of the Flathead system, consisting of upper rivers, lake and lower river, has been modified by the construction and operation of two major hydroelectric facilities, Hungry Horse Dam on the south fork Flathead River and Kerr Dam at the outlet of Flathead Lake. The modified ...
While tritium exposure to the site-workers in Wolsung NPP is up to about 40% of the total personnel exposure, Ministry of Science and Technology has asked tritium removal facility for requirement of post heavy-water reactor construction. For the purpose of essential removal of tritium from the Wolsung heavy-water reactor system, a preliminary study on the cryogenic Ar-N{sub 2} and H{sub 2}-D{sub 2} distillation process for development of liquid-phase catalytic exchange cryogenic hydrogen distillation process technology. The Ar-N{sub 2} distillation column showed good performance with approximately 97% of final Ar concentration, and a computer simulation code was modified using these data. A simulation code developed for cryogenic hydrogen isotopes (H{sub 2}, HD, D{sub 2}, HT, DT, T{sub 2}) distillation column showed good performance after comparison with the result of a JAERI code, and a H{sub 2}-D{sub 2} distillation column was made. Gas ...
This paper describes the modeling of horizontal steam generator with the TRACE code and calculation results of a loss-of-feedwater (LOF-10) experiment at the PACTEL facility. Parallel Channel Test Loop (PACTEL) is an integral test facility for a VVER-440 type nuclear reactor. The main objectives were to prepare a simulation model for its horizontal steam generator with the TRACE thermal hydraulic code and assess different modeling options of the code. PACTEL experiment LOF-10 was chosen for this assessment. The calculation results showed that TRACE is capable in simulating horizontal steam generator behavior both in steady state and during loss-of-feedwater transient. The phenomenon of heat transfer from primary to secondary side, steam superheating and flow reversal in the lowest heat exchange tubes were studied in detail. Different nodalization options were introduced. In the simulation of PACTEL loss-of-feedwater experiment LOF-10, the main ...
This paper describes the modeling of horizontal steam generator with the TRACE code and calculation results of a loss-of-feedwater (LOF-10) experiment at the PACTEL facility. Parallel Channel Test Loop (PACTEL) is an integral test facility for a VVER-440 type nuclear reactor. The main objectives were to prepare a simulation model for its horizontal steam generator with the TRACE thermal hydraulic code and assess different modeling options of the code. PACTEL experiment LOF-10 was chosen for this assessment. The calculation results showed that TRACE is capable in simulating horizontal steam generator behavior both in steady state and during loss-of-feedwater transient. The phenomenon of heat transfer from primary to secondary side, steam superheating and flow reversal in the lowest heat exchange tubes were studied in detail. Different nodalization options were introduced. In the simulation of PACTEL loss-of-feedwater experiment LOF-10, the main ...
The Neutral Beam Test Facility (NBTF) to be realized in Padoa will test the Neutral Beam Injection (NBI), one of the Heating and Current Drive Systems foreseen for ITER. The NBI is based on the acceleration of hydrogen or deuterium negative ions up to 1 MeV. This work has been aimed at assessing the tritium release from the NBTF in order to provide data for the safety analysis. In particular, the diffusion of the tritium through the neutral beam target material (the CuCrZr alloy calorimeter panels) has been assessed by using literature data of the diffusion coefficient. The tritium generated inside the calorimeter panels moves into both the vacuum and water side: the tritium diffusion flux has been evaluated during the beam-on (200 deg. C) and the beam-off (20 deg. C) phases of the NBTF experiments consisting of an interim campaign and a final test. The penetration depth of the tritium through the 2 mm thick CuCrZr alloy material has been also ...
The Neutral Beam Test Facility (NBTF) to be realized in Padoa will test the Neutral Beam Injection (NBI), one of the Heating and Current Drive Systems foreseen for ITER. The NBI is based on the acceleration of hydrogen or deuterium negative ions up to 1 MeV. This work has been aimed at assessing the tritium release from the NBTF in order to provide data for the safety analysis. In particular, the diffusion of the tritium through the neutral beam target material (the CuCrZr alloy calorimeter panels) has been assessed by using literature data of the diffusion coefficient. The tritium generated inside the calorimeter panels moves into both the vacuum and water side: the tritium diffusion flux has been evaluated during the beam-on (200 deg. C) and the beam-off (20 deg. C) phases of the NBTF experiments consisting of an interim campaign and a final test. The penetration depth of the tritium through the 2 mm thick CuCrZr alloy material has been also ...
This handbook provides the necessary tools for the engineer to design forced-cooled HPOF pipe-type cable systems. It represents the final objective of a major project which included an extensive research program at the Waltz Mill Forced-Cooling Test Facility. The formulas and procedures presented in this handbook are consistent with the results of this program as well as other full-scale and model investigations. Introductory material, including historical information, general design concepts and basic heat transfer and fluid dynamics theory is given for those who are unfamiliar with the fundamental principles of forced-cooling. The nucleus of the handbook consists of equations and calculating procedures for determining forced-cooled parameters and thermal/hydraulic performance levels. Both simple and sophisticated procedures have been provided, with the more complex procedures treating such areas as the thermal interaction between cable pipes ...
As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never ...
The saturation of South Korea's at-reactor (AR) spent fuel storage pools will create a necessity for additional spent fuel storage capacity. Because the South Korean government has the plan to increase the number of nuclear power plants from 20 units (end of 2005) to 27 units by 2015, the increase of spent nuclear fuel generation will be accelerated. Because there is no clear national plan for spent nuclear fuel storage and disposal, the utility company (Korea Hydraulic Nuclear Power company) is planning to construct a spent fuel storage facility with 11 000 tHM capacity for Pressurised Water Reactor (PWR). This study is intended to predict the maximum allowable periods when the storage facility will be fully occupied with respect to the already fixed re-racking plan of spent fuel storage pools and construction of new nuclear power plants. The result from this study will be used as fundamental data for an efficient management of the spent fuel ...
Reactor COre Protection System (RCOPS), an advanced core protection calculator system, is a digitized one which provides core protection function based on two reactor core operation parameters, Departure from Nucleate Boiling Ratio (DNBR) and Local Power Density (LPD). It generates a reactor trip signal when the core condition exceeds the DNBR or LPD design limit. It consists of four independent channels adapted a two-out-of-four trip logic. System configuration, hardware platform and an improved algorithm of the newly designed core protection calculator system are described in this paper. One channel of RCOPS was implemented as a single channel facility for this R and D project where we performed final integration software testing. To implement custom function blocks, pSET is used. Software test is performed by two methods. The first method is a 'Software Module Test' and the second method is a 'Software Unit Test'. New features include ...
The paper presents the progress of the Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor WWR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for WWR-S decommissioning was also developed. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in ...
The Office of Civilian Radioactive Waste-Management in the Department of Energy (DOE) is responsible for disposing of this nation`s spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and the quality of the environment. Although embodied in the Federal repository program that began with studies in the late 1950s, this mission was explicitly established by the Nuclear Waste Policy Act of 1982 and reaffirmed by the Nuclear Waste Policy Amendments Act of 1987. To fulfill our mission, we are developing a waste management system consisting of a geologic repository for permanent disposal deep beneath the surface of the earth, a facility for monitored retrievable storage, and a system for transporting the waste. This discussion draft was developed to help involve parties affected by or interested in the waste-management program in the formulation of the basic principles on which the program will be based. It reviews ...
In this research, first, event and process relevant to the key words (or scenario initiator) such as volcanism have been identified and, especially a middle-scale eruption scenario including pyroclastic flows has been analyzed as the catastrophic scenario, which inspires ordinary people to have tremendous concern. Secondly, based upon the characteristic events and processes of each scenario considered in the above and through the research of existing model of such risk, quantitative concept (release amount magnitude, release mode, release form, frequency of release, probability etc.) and impact on repository system, facility and environment have been analyzed, defended and defined. Model which can assess and analyze such impact has been built. Using these models, risks directly or indirectly caused by HLW repository have been calculated. Finally, the process for assessing the consequence of volcanism scenario and its risk calculated by the ...
This paper presents the experience faced by people who works in PETROBRAS Business Unit (UN-RNCE), located in Rio Grande do Norte Province, Brazil, during the implementation of a pipeline leak detection system. That application involved nine multiphase oil pipelines distributed along several production facilities. Because of the emergency after the leakage that polluted the Guanabara bay and due to the two phases and multi phases pipelines characteristics, the UN-RNCE decided to apply the Pressure Point Analysis (PPA) technology in order to detect leakages. It is a statistical method for leak detection e uses a very simple instrumentation which facilitates the installation and maintenance. However, in order to get the best performance of the system, it is necessary to know thoroughly the whole process and have a fast and reliable SCADA system for long distance communication. Finally it will be shown the test results, the recommendations to ...
The United States Air Force School of Aerospace Medicine (USAFSAM) tests the quantitative fit of masks which are worn by military personnel during nuclear, biological, and chemical warfare. Subjects are placed in a Dynatech-Frontier Fit Testing Chamber, salt air is fed into the chamber, and samples of air are drawn from the mask and the chamber. The ratio of salt air outside the mask to salt air inside the mask is called the quantitative fit factor. A motion-time study was conducted to evaluate the efficiency of the layout and work method presently used in the laboratory. A link analysis was done to determine equipment priorities, and the link data and design guidelines were used to develop three proposed laboratory designs. The proposals were evaluated by projecting the time and motion efficiency, and the energy expended working in each design. Also evaluated were the lengths of the equipment links for each proposal, and each proposal's adherence to design guidelines. A ...
This is the final report of a three-year, Laboratory Directed Research and Development (LDRD) project at Los Alamos National Laboratory (LANL). Nature uses chlorophyll and other porphyrinic pigments to capture and transfer light energy as a preliminary step in photosynthesis. The design of synthetic assemblies of light harvesting and energy directing pigments has been explored through synthesis and characterization of porphyrin oligomers. In this project, pigment electronic and vibrational structures have been explored by electrochemistry and dynamic and static optical measurements. Transient absorption data reveal energy transfer between pigments with lifetimes on the order of 20--200 picoseconds, while Raman data reveal that the basic porphyrin core structure is unperturbed relative to the individual monomer units. These two findings, along with an extensive series of experiments on the oxidized oligomers, reveal that coupling between the pigments is ...
This is the final report of a two-year, Laboratory Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). This project has examined the fundamental chemistry of plutonium that affects the integration of hydrothermal technology into nuclear materials processing operations. Chemical reactions in high temperature water allow new avenues for waste treatment and radionuclide separation.Successful implementation of hydrothermal technology offers the potential to effective treat many types of radioactive waste, reduce the storage hazards and disposal costs, and minimize the generation of secondary waste streams. The focus has been on the chemistry of plutonium(VI) in solution with carbonate since these are expected to be important species in the effluent from hydrothermal oxidation of Pu-containing organic wastes. The authors investigated the structure, solubility, and stability of the key plutonium complexes. Installation and ...
The coke plant at the Sparrows Point Plant consist of three coke oven batteries and two coal chemical plants. The by-product coke oven gas (COG) consists primarily of hydrogen, methane, carbon monoxide, nitrogen and contaminants consisting of tars, light oils (benzene, toluene, and xylene) hydrogen sulfide, ammonia, water vapor and other hydrocarbons. This raw coke oven gas needs to be cleaned of most of its contaminants before it can be used as a fuel at other operations at the Sparrows Point Plant. In response to environmental concerns, BSC decided to replace much of the existing coke oven gas treatment facilities in the two coal chemical Plants (A and B) with a group of technologies consisting of: Secondary Cooling of the Coke oven Gas; Hydrogen Sulfide Removal; Ammonia Removal; Deacification of Acid Gases Removed; Ammonia Distillation and Destruction; and, Sulfur Recovery. This combination of technologies will replace the existing ammonia removal system, the ...
The coke plant at the Sparrows Point Plant consist of three coke oven batteries and two coal chemical plants. The by-product coke oven gas (COG) consists primarily of hydrogen, methane, carbon monoxide, nitrogen and contaminants consisting of tars, light oils (benzene, toluene, and xylene) hydrogen sulfide, ammonia, water vapor and other hydrocarbons. This raw coke oven gas needs to be cleaned of most of its contaminants before it can be used as a fuel at other operations at the Sparrows Point Plant. In response to environmental concerns, BSC decided to replace much of the existing coke oven gas treatment facilities in the two coal chemical Plants (A and B) with a group of technologies consisting of: Secondary Cooling of the Coke oven Gas; Hydrogen Sulfide Removal; Ammonia Removal; Deacification of Acid Gases Removed; Ammonia Distillation and Destruction; and, Sulfur Recovery. This combination of technologies will replace the existing ammonia removal system, the ...
This is the eighth part of a ten-part final report for the Swiss Federal Office of Energy (SFOE) on a project that looked into potential problems relating to the Swiss electricity distribution grid with respect to the increasing number of distributed power generation facilities being put into service. The identification of special conditions for the grid's operation and future development that take increasing decentralised power production into account are discussed. The results of the project activities encompass the analysis and evaluation of various problem areas associated with planning and management of the grid during normal operation and periods of malfunction, as well as required modifications to safety systems and grid configurations. This seventh appendix to the main report summarises and discusses the knowledge gained during the project and attempts to provide answers to various questions posed by the use of distributed ...
As for No.2 plant in Sendai Nuclear Power Station, which is the fourth nuclear power generation facilities in Kyushu Electric Power Co., Inc., all works have been completed, and at present, the final trial operation is under way. In No.2 plant, many new techniques for raising the reliability and safety, improving the maintainability and reducing radiation exposure were introduced on the basis of the operation experience of PWRs obtained so far, similarly to No.1 plant. In this paper, the main items of the new techniques related to the design and construction of the plant are reported. No. 2 plant is a first improved and standardized plant having the thermal output of 2660 MW for standard three-loop PWRs, and the rated power output was set at 890 MW. As for the turbine, TC6F-40 in was adopted. As the improved design, a large reactor containment vessel, 17 x 17 type 9-grid fuel, improved steam generators, a reactor vessel cover of one-body type, ...
A centrifugal pump was developed for the efficient and reliable transfer of liquid helium in space. The pump can be used to refill cryostats on orbiting satellites which use liquid helium for refrigeration at extremely low temperatures. The pump meets the head and flow requirements of on-orbit helium transfer: a flow rate of 800 L/hr at a head of 128 J/kg. The overall pump efficiency at the design point is 0.45. The design head and flow requirements are met with zero net positive suction head, which is the condition in an orbiting helium supply Dewar. The mass transfer efficiency calculated for a space transfer operation is 0.99. Steel ball bearings are used with gas fiber-reinforced teflon retainers to provide solid lubrication. These bearings have demonstrated the longest life in liquid helium endurance tests under simulated pumping conditions. Technology developed in the project also has application for liquid helium circulation in terrestrial facilities and for ...
Low and intermediate waste disposal facilities safety assessment is comprised of several steps from site selection , construction and operation to post-closure performance assessment. This is a multidisciplinary and complex task , and can not be analyzed by one expert only. This high complexity can lead to ambiguity and vagueness in information and consequently in the decision making process. In order to make the decision process clear and objective, there is the need to provide the decision makers with a clear and comprehensive picture of the whole process and, at the same time, simple and easily understandable by the public. This paper suggests the development of an inference system based on fuzzy decision making methodology. Fuzzy logic tools are specially suited to deal with ambiguous data by using language expressions. This process would be capable of integrating knowledge from various fields of environmental sciences. It has an advantage of keeping record of ...
Particle physics is driven by five great topics. Neutrino oscillations and masses are now at the fore. The standard model with extensions to supersymmetry and a Higgs to generate mass explains much of the field. The origins of CP violation are not understood. The possibility of extra dimensions has raised tantalizing new questions. A fifth topic lurking in the background is the possibility of something totally different. Many of the questions raised by these topics require powerful new accelerators. It is not an overstatement to say that for some of the issues, the accelerator is almost the experiment. Indeed some of the questions require machines beyond our present capability. As this volume attests, there are parts of the particle physics program that have been significantly advanced without the use of accelerators such as the subject of neutrino oscillations and many aspects of the particle-cosmology interface. At this stage in the development of physics, both approaches are needed ...
Universal Oil Products, Inc. (UOP) of Des Plaines, Illinois has contracted A.E. Roberts & Associates, Inc. (AERA) of Atlanta, Georgia to prepare a sensitivity analysis for the development of the Fluidized-bed Copper Oxide (FBCO) process. As proposed by AERA in September 1991, development of the FBCO process design for a 500 mega-watt (MW) unit was divided into three tasks: (1) Establishment of a Conceptual Design, (2) Conceptual Design, (3) Cost Analysis Task 1 determined the basis for a conceptual design for the 500 megawatt (MW) FBCO process. It was completed by AERA in September of 1992, and a report was submitted at that time {open_quotes}Establishment of the Design Basis for Application to a 500 MW Coal-fired Facility.{close_quotes} Task 2 gathered all pertinent data available to date and reviewed its applicability to the 500 MW FBCO process. Work on this task was carried out on a joint basis by the AERA team members: Roberts & Schaefers worked on the ...
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. ...
The financial evaluation of capital and operating cost estimates for a dry coke quenching facility installation indicates a marginal return on investment if the evaluation is based exclusively on steam credits. However, the potential improvements in environmental emissions and reported, but unverified, blast furnace operations may justify the expenditure. The Russian and Japanese claim of 2 to 4% reduction in blast furnace coke usage with up to 4% increase in iron production has not been demonstrated in the domestic steel industry and, therefore, is not included in the financial analysis. A 2% coke reduction represents a savings of approximately $0.81 per ton of hot metal produced or an additional annual credit of $1,800,000 for dry coke quenching, exclusive of productivity gains. Additional credit of this magnitude would increase the estimated discounted cash flow return from 10% to approximately 16% for the estimated capital expenditure of $21,742,652. The ...
In order to effectively recover uranium, rotation speed of solid cathode was examined, and effect of uranium concentration and current density on electrodeposition were confirmed. And the potentiostatic and galvanostatic electrorefining experiments were conducted. Element used in the experiments were Zr, Nd, La chlorides. The reduction potentials of chlorides metals on liquid Cd cathode were measured by cyclic voltammetry experiments. The electrowinning experiments were performed in order to recover small amounts of uranium in salt. Experimental set-up for the batch type reductive extraction experiments were developed and installed. On the base of experimental results of batch type, multi-stage extraction equipment was set-up, and optimum number of stage and recover yield were measured. In the oxidative extraction study is examine selective separation behavior of the rare earth metals from alloy composed of actinide and lanthanide metals to determine the effective separation condition. ...
Sub sea pipeline construction at oil and gas fields, with high concentration of on-bottom facilities, becomes more difficult when mooring operations and pipeline approach to a congested platform have to be performed. One method that has often been applied in Brazil is the so-called 'DP (Dynamic Positioning) pull-in', where PETROBRAS owned pipelay Barge, BGL-1, is moored away from the congested area, while a DP anchor handler pulls the rigid pipeline from BGL-1 to a target near the platform. The method was conceived to avoid mooring operations near the congested platforms as well as to minimize risks due to the pipeline initiation process. Inside the congested area the initiation with aid of a 'dead-man' anchor on the sea bottom, which would be a more conventional solution, becomes impossible in most cases. This paper will discuss the engineering work required to perform the 'DP pull-in' as well as show the ...
Studies have been conducted to determine the feasibility of using collisional cooling for reducing emittances and energy spreads in negative-ion beams to levels commensurate with effective isobaric purification with conventional high-resolution electromagnetic isobar separators as required for use at the Holifield Radioactive Ion Beam Facility (HRIBF). We have designed a gas-filled radio frequency quadrupole ion cooler equipped with provisions for retarding energetic negative-ion beams to energies below thresholds for electron detachment at injection and for re-acceleration to initial energies after the cooling process. The device has been used to cool several ion beams with initial energy spreads, {delta}E>10 eV to final energy spreads, {delta}E{approx}2 eV FWHM, including O{sup -} and F{sup -}. Overall transmission efficiencies of {approx}14% for F{sup -} beams have been obtained. Experimental results show that electron detachment is ...
This project was supported through ERDA to demonstrate that the temporal distribution of tritium can be documented by the analysis of bound hydrogen in annual tree-ring samples. The project focuses on two sample locations at the Savannah River Site (SRS), a nuclear material production facility located in Aiken, SC. The SRS provided samples of cross-sections from a single tree that were to be pooled together for analysis. Annual tree-rings were identified in each cross-section sample and separated for the period 1954 to 1993. These annual samples were ground and chemically treated to separate the hollocellulose fraction of the wood, then subsequently combusted and the resulting water counting using low-level liquid scintillation counting equipment. Additionally, the ground annual tree-rings were gamma-counted to determine any temporal variation in radionuclide activity and analyzed with x-ray fluorescence to find any temporal variation in trace-element ...
The purpose of this assessment is to develop a versatile process that will provide a mechanism for evaluating both present and future risks to this environment. Much of the regulatory and environmental interest in the port has centered around a Ballast Water Treatment facility that treats and discharges up to 30 mgd of oily ballast water brought in by crude oil tankers. However, six point discharges and other potential sources of pollution exist in the area. The authors have delineated eleven subareas in the port in order to identify the potential anthropogenic stressors, as well as the receptors that could be exposed to these stressors. Potential effects were then characterized for each exposure. Each component is ranked and integrated, resulting in a relative risk estimate in each subarea. Both the discernible risks, based on available data, and the data gaps are presented. Uncertainty is expressed as a range of high and low risk associated with each component. ...
There is growing interest in the generation and characterization of femtosecond and subfemtosecond pulses from linac-based free-electron lasers (FELs). In this report, following the method of Ricci and Smith (Phys. Rev. ST Accel. Beams 3, 032801 (2000)), we investigate the measurement of the longitudinal bunch profile of an ultrashort electron bunch produced by these FELs. We show that this method can be applied in a straightforward manner at x-ray FEL facilities such as the Linac Coherent Light Source by slightly adjusting the second bunch compressor followed by running the bunch on an rf zero-crossing phase of the final linac. We find that the linac wakefield strongly perturbs the measurement, and through analysis show that it can be compensated in a simple way. We demonstrate the effectiveness of this method and wakefield compensation through numerical simulations, including effects of coherent synchrotron radiation and longitudinal space ...
X-ray ablation of material from the first wall and other components of an ICF (Inertial Confinement Fusion) chamber is a major threat to the laser final optics. Material condensing on these optics after a shot may cause damage with subsequent laser shots. To ensure the successful operation of the ICF facility, removal rates must be predicted accurately. The goal for this dissertation is to develop an experimentally validated x-ray response model, with particular application to the National Ignition Facility (NIF). Accurate knowledge of the x-ray and debris emissions from ICF targets is a critical first step in the process of predicting the performance of the target chamber system. A number of 1-D numerical simulations of NIF targets have been run to characterize target output in terms of energy, angular distribution, spectrum, and pulse shape. Scaling of output characteristics with variations of both target yield and ...
The Korean Next Generation Reactor (KNGR) adopts 4-train Direct Vessel Injection (DVI) configuration and injects the safety injection water directly into the downcomer through the 8.5'' DVI nozzle. Thus, the thermal hydraulic phenomena such as ECCS mixing and bypass are expected to be different from those observed in the cold leg injection. In order to investigate the realistic injection phenomena and modify the analysis code developed in the basis of cold leg injection, thermal hydraulic test with the performance evaluation is required. Preliminarily, the sequence of events and major thermal hydraulic phenomena during the small break LOCA for KNGR are identified from the analysis results calculated by the CEFLASH-4AS/REM. It is shown from the analysis results that the major transient behaviors including the core mixture level are largely affected by the downcomer modeling. Therefore, to investigate the proper thermal hydraulic phenomena occurring in the downcomer ...
The high voltage/high power DC-cathode power supply for the Gyrotron Test Facility at the Forschungszentrum in Karlsruhe consists of a 12-pulse thyristor star-point-controller, a 130 kV capacitor-bank followed by a tetrode regulator. Originally designed for 80 kV/30 A CW (continous-wave) operation, its operating regime has been extended in line with gyrotron development to pulses of 65 kV/45 A/3 min and more recently to 65 kV/80 A/10 s without any changes to the main load bearing components (thyristors, transformers or power tetrode). This allows testing of gyrotrons in the 0.5 MW (CW), 1 MW (3 min) and 2 MW (10 s) output power range. The paper describes the system, its operation and some critical aspects of the last upgrade, such as the issue of harmonics in the 20 kV distribution mains-grid, the dynamic response of the thyristor-controller and the avoidance of microwave parasitic oscillations in the high power tetrode (a CQK-200-4, developed by ABB, Switzerland ...
A core competency is a distinguishing integration of capabilities which enables an organization to deliver mission results. Core competencies represent the collective learning of an organization and provide the capacity to perform present and future missions. Core competencies are distinguishing characteristics which offer comparative advantage and are difficult to reproduce. They exhibit customer focus, mission relevance, and vertical integration from research through applications. They are demonstrable by metrics such as level of investment, uniqueness of facilities and expertise, and national impact. The Oak Ridge National Laboratory (ORNL) has identified four core competencies which satisfy the above criteria. Each core competency represents an annual investment of at least $100M and is characterized by an integration of Laboratory technical foundations in physical, chemical, and materials sciences; biological, environmental, and social sciences; engineering ...
The operation of nuclear processing facilities and defense-related nuclear activities has resulted in contamination of near-surface and deep-subsurface sediments with both radionuclides and metals. The presence of mixed inorganic contaminants may result in undetectable microbial populations or microbial populations that are different from those present in uncontaminated sediments. To determine the impact of mixed radionuclide and metal contaminants on sediment microbial communities, we sampled a processing pond that was used from 1948 to 1975 for the disposal of radioactive and metal-contaminated wastewaters from laboratories and nuclear fuel fabrication facilities on the Hanford Site in Washington State. Because the Hanford Site is located in a semiarid environment with average rainfall of 159 mm/year, the pond dried and a settling basin remained after wastewater input into the pond ceased in 1975. This processing pond basin offered a unique ...
This report covers the technical effort through February, 1989. This effort was directed towards the technology associated with the development of a large scale, long pulse DF-CO{sub 2} chemical laser. Optics damage studies performed under Task 1 assessed damage thresholds for diamond-turned salt windows. Task 2 is a multi-faceted task involving the use of PHOCL-50 for laser gain measurements, LTI experiments, and detector testing by LANL personnel. To support these latter tests, PHOCL-50 was upgraded with Boeing funding to incorporate a full aperture outcoupler that increased its energy output by over a factor of 3, to a full kilojoule. The PHOCL-50 carbon block calorimeter was also recalibrated and compared with the LANL Scientech meter. Cloud clearing studies under Task 3 initially concentrated on delivering a Boeing built Cloud Simulation Facility to LANL, and currently involves design of a Cold Cloud Simulation Facility. A Boeing IRAD ...
To use such sites very effectively, pile foundations will be used for soil stabilization and for important structures for the prevention of subsidence. Negative friction that may ensue from the differential settlement of the soil has to be prevented. Measures against gas will include gas collecting and exhausting facilities in the lower parts of structures, natural and forced exhaust systems, and gas detection/warning units. For revegetation, plants strong against bad soil should be selected, they should be protected from generated gas with protecting sheets or the like, and a thick layer of vegetation-capable soil needs to be laid. Replacement, compaction, and solidification are the fundamentals of soil improvement at wastes final treatment locations and of soil-related pollution prevention in the vicinity of the newly produced sites. Across the country, the service life expectancy is approximately 7-8 years for general wastes and ...
A number of test series to investigate passive safety systems for the next generation of Light Water Reactors have been performed in the PANDA multi-purpose facility at the Paul Scherrer Institut (PSI). The large scale thermal-hydraulic test facility allows to investigate LWR containment phenomena and system behaviour. PANDA was first used to examine the Passive Containment Cooling System (PCCS) for the Simplified Boiling Water Reactor (SBWR). In 1996 new test series were initiated; all related to projects of the EC Fourth Framework Programme on Nuclear Fission Safety. One of these projects (TEPSS) is focused on the European Simplified Boiling Water Reactor (ESBWR). The ESBWR containment features and PCCS long-term post LOCA response were investigated in PANDA. The PCCS start-up was demonstrated, the effect of nitrogen hidden somewhere in the drywell and released later in the transient was simulated and the effect of light gases (helium) on the ...
British Nuclear Fuels plc owns and operates the near-surface Drigg disposal facility for low level radioactive waste. The long-term performance of the site is modelled by a suite of computer codes called MONDRIAN. One of the modules of MONDRIAN deals with the transport of radionuclides through the environment, and this paper reports on the current status of this module (BIOS). We derive the basic set of working equations from first principles and show clearly how the approximate nature of the final equations is arrived at. This is done by an averaging process leading to compartments, in and out of which radionuclides, solids and water can flow. The equations allow radioactive decay chains and an arbitrary number of compartments. There is also the facility to deal with changes in the rate coefficients, thereby simulating different environmental states. It is also possible to include the creation of new compartments arising ...
This award provided for an automated computer-controlled goniometer/diffractometer/manipulator with hot and cold stages and data acquisition system that was interfaced with the high resolution Scienta ESCA-300 X-ray photoelectron spectrometer at Lehigh University. The automation allows angular dependent X-ray photoelectron spectroscopy (XPS) and ultraviolet photoelectron spectroscopy (UPS) data to be accurately and rapidly collected without the very time-consuming and labor-intensive manual method that was previously required. It also provides for automated multi-sample analyses, collecting both wide survey scans and selected binding energy range analyses, with complete computer control and data storage. This allows 24 hour data collection without requiring the continuous presence of operators. The overall result is a greater productivity for the XPS laboratory, approximately doubling the output of the laboratory. While the automated computer-controlled goniometer/manipulator with ...
In the 14 MeV Neutron Laboratory, we have continued the development of a facility that is now the only one of its kind in operation in the United States. We have refined the klystron bunching system described in last year's report to the point that 1.2 nanosecond pulses have been directly measured. We have tested the pulse shape discrimination capability of our primary NE 213 neutron detector. We have converted the RF sweeper section of the beamline to a frequency of 1 MHz to replace the function of the high voltage pulser described in last year's report which proved to be difficult to maintain and unreliable in its operation. We have also overcome several other significant experimental difficulties, including a major problem with a vacuum leak in the main accelerator column. We have completed additional testing to prove the remainder of the generation and measurement systems, but overcoming some of these experimental difficulties has delayed the ...
For Stage II of the European Dioxin Project the following objectives were set: - Amendment of existing emission data collected for most relevant emission sources in order to reduce uncertainties of emission estimates. Collecting first emission data from countries not yet performing dioxin emission measurement programs. Extending the inventory of dioxin emissions to ambient air produced in Stage I by a complementary study on emissions to land and water. Extending the regional scope of data collection to countries in Central Europe. The report of Stage II of the European Dioxin Project is presented in 3 Volumes. Volume 1 contains an overview on the background and approach of different activities carried out and on the results obtained. These results are put into a broader view regarding the dioxin reduction measures in Europe leading to conclusions and recommendation for future work. Volume 2 of the report contains a detailed presentation of the sub-projects carried out. The chapters of ...
There are several concerns which bring to consider natural gas as a viable alternative to liquid fuels in transport. First, natural gas allows the curbing of global pollution in this steadily growing industry. Indeed, decoupling greenhouse gas emissions from transport growth has become a major issue in tackling climate change. Second, a more extensive use of natural gas would relieve city air quality, which is presently at levels harmful of human health. Nonetheless, this is just one side of the coin. The other side entails building a refuelling station network, and this carries financial requirements. The financing fraction holds a pivotal role in deciding whether natural gas for automotive purposes is an efficient solution. The final aim of this work is, therefore, to compare the natural gas advantages, stemming from avoided global and local emission, with the economic rationale of engaging in supplementary model network investments. A system dynamics model ...
For heavy-ion beam driven inertial fusion ''liquid-protected'' reactor designs such as HYLIFE-II, a mixture of molten salts made of F{sup 10}, Li{sup -6}, Li{sup 7} and Be{sup 9} (called flibe) allows small chambers and final-focus magnets closer to the target with superconducting coils suffering higher radiation damage, though they can stand only a certain amount of energy deposited before quenching. This work has been primarily focusing on verifying that total energy deposited by fusion neutrons and induced gamma rays remain under such limit values and the final purpose is the optimization of the shielding of the magnetic lens system from the points of view of the geometrical configuration and of the physical nature of the materials adopted. The system is analyzed in terms of six geometrical models going from simplified up to much more realistic representations of a system of 192 beam lines, each focused by ...
The High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory is one of the world's most powerful research reactors. In 1996, one year after the demise of the Advanced Neutron Source Project, the U.S. Department of Energy embarked on an aggressive program to upgrade the neutron scattering facilities at the HFIR. These upgrades, which are now in progress, include the installation of larger beam tubes, a high-performance hydrogen cold source, and additional neutron guides and neutron scattering instruments. An extensive analysis effort was performed over the past 4 yr to support the design of the modified beamlines and new user facilities and to assess the impact of the upgrades on the integrity of the existing reactor system. The results of three of these analyses are summarized here. Specifically, results are presented for analyses related to the design of the new cold neutron source (CNS), the assessment of beam tube changes on ...
This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings.
All the tests have been finished up in the Waste Management and Disposal Facility which has been used for the safety tests of solidified radioactive waste on sea dumping disposal. The decommissioning of this facility was performed for use of radioisotopes. This report describes the plan on decommissioning of facility for use of radioisotopes, the contamination checking methods and measurement of radioactivity, the fore case and practice for amount of generated radioactive wastes, the operation procedures for dismantlement, the safety measures, the expenses for decommissioning and so on. (author)
Sewage waste disposal facilities in the Florida Keys include septic tanks and individual package plants in place of municipal collection facilities in most locations. In Key Largo, both facilities discharge...Full Text Available
The discussion of energy usage falls naturally into three parts. The first is a review of what the problem is, the second is a description of steps that can be taken to conserve energy at existing facilities, and the third is a review of the implications of energy consumption on future facilities.
In Korea, the Proton Engineering Frontier Project (PEFP) is building a proton linear accelerator facility with energy up to 100MeV and a beam current of 20mA. In this study, a radiation field after shutdown in the accelerator facility of the PEFP was evaluated for the purpose of the radiation shielding by using MCNPX code. A facility modeling was performed for the accelerator tunnel building, accelerator chain, target rooms and beam experiment hall. And radiation source terms were evaluated in the facility. With this facility, model and radiation source terms, the concentration of 41Ar was evaluated and the cooling time satisfying regulation in Korea was calculated.
This issue is the collection of the papers on progress of researches by common utilization of JAERI nuclear facilities. The 43 of the papers are indexed individually. (J.P.N.)
Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2006 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (U.S. Department of Energy, 2006; Warren and Grossman, 2007; National Security Technologies, LLC, 2007). Direct radiation monitoring data indicate that exposure levels around the RWMSs are at or below background levels. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. There is no detectable man-made radioactivity by gamma spectroscopy, and concentrations of americium ...
The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not ...
Waste Technology and Innovation Study Final Report ...Waste Technology and Innovation Study Final Report 21/18569/150554 ...Survey of waste and resource recovery related technology and innovation, including products and product uses
When completed, Lawrence Livermore National Laboratory's (LLNL) National Ignition Facility (NIF) will be the world's largest laser with experimental capabilities applicable to stockpile stewardship, energy research, science and astrophysics. As construction of the conventional facilities nears completion, operations supporting the installation of specialized laser equipment have come online. Playing a critical role in the precision cleaning of mechanical parts from the NIF beamline are three pieces of aqueous cleaning equipment. Housed in the Optics Assembly Building (OAB), adjacent to NIF's laser bay, are the large mechanical parts gross cleaner (LMPGC), the large mechanical parts precision cleaner (LMPPC), and the small mechanical parts gross and precision cleaner (SMPGPC). These aqueous units, designed and built by Sonic Systems, Inc., of Newtown, Pennsylvania, not only accommodate parts that vary greatly in size, ...
The IAEA has requested several member states to present their proposal of the application of the Integrated Safeguards (IS) system in their nuclear facilities. This report contains a IS proposal for Finland prepared under the Task FIN C 1264 of The Finnish Support Programme to IAEA Safeguards. The comprehensive safeguards system of the International Atomic Energy Agency (IAEA) has been one of the main tools in the fight against nuclear proliferation since the entry-into-force of the Nuclear Non-proliferation Treaty three decades ago. In the 1990s some of the inherent weaknesses of this so-called traditional safeguards system were revealed first in Iraq and then in North Korea. Therefore, the member states of the LAEA decided to give the Agency additional legal authority in order to make its control system more effective as well as more efficient than before. This was accomplished by the approval of the so-called Model Additional Protocol (INFCIRC/540) in 1997. ...
CORAL-I was an experimental, zero-power, fast-spectrum, high-enriched metal uranium reactor that operated from 1968 until 1988 at the former Junta de Energia Nuclear (JEN), CIEMAT at present. The critical measurements performed at the startup of the reactor are being evaluated as part of the International Critical Safety Benchmark Evaluation Program (ICSBEP) and proposed to be included in its 2001 edition. Additionally, the measurement of the mass reactivity coefficient is compared with MCNP4B calculations. This measurement allows one to perform the approach to critical without the need of a previous control rod calibration, thus enhancing the safety of such an approach. This technique can also be applied to other reactor types. CORAL-I (Ref. 1) is a 90% enriched metal uranium reactor domestically designed and manufactured in the experimental facilities of JEN, now CIEMAT, in Madrid, Spain. The enriched uranium was supplied by the International Atomic Energy Agency ...
Characteristics of the Ukrainian NSA NRI radiation facility for scientific researches and developments of industrial radiation technology are performed. Parts of the facility, design peculiarities of technical tools are described. Biological protection of the facility and radiation protection system, transport line, systems of technical provision and radiation measurements are discussed
In this paper the possibility of using the test facility PACTEL concerning the investigations of thermal hydraulic special features of the primary coolant circuit acting under natural circulation is under consideration. It is suggested to study a stratification phenomenon of a coolant in upper plenum of a reactor and also a horizontal steam generator (HSG) hot collector temperature regime. For such investigations the facility must be modified. It is shown that this work is not large and expensive, as the facility is a lightly suitable unit for different researches. (orig.)
In this paper the possibility of using the test facility PACTEL concerning the investigations of thermal hydraulic special features of the primary coolant circuit acting under natural circulation is under consideration. It is suggested to study a stratification phenomenon of a coolant in upper plenum of a reactor and also a horizontal steam generator (HSG) hot collector temperature regime. For such investigations the facility must be modified. It is shown that this work is not large and expensive, as the facility is a lightly suitable unit for different researches. (orig.)
A thermal neutron imaging facility for computed tomography and real-time neutron radiography is being developed at the University of Texas at Austin. The TRIGA reactor is a graphite-reflected Mark It pool-type research reactor. The neutron imaging facility will use beam port, which is at one end of a through part. Monte Carlo calculations were used to design the neutron collimator for this facility.
This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines.
... harassment, incidental to construction and operation of an offshore liquefied natural gas (LNG) facility. Under the Marine Mammal Protection ... ...
Korea Atomic Energy Research Institute (KAERI) has many R and D facilities in operation, including HANARO research reactor, radioactive waste treatment facility (RWTF), post-irradiation examination facility (PIEF) and irradiated material test facility (IMEF). Recently, nation-wide interest is focused on the safety and security of major industrial facilities. Safe operation of nuclear facilities is imperative because of the consequence of public disaster by radiological release/ contamination, in case of an accident. Recently, Ministry of Science and Technology (MOST) of the Korean government announced amendments of Atomic Energy laws to enforce requirements of the physical protection and radiological emergency. In this paper, the context of amended Atomic Energy laws were reviewed to confirm quality assurance measures and identify additional QA activities, if ...
Large volumes of woodwaste disposal by incineration in a number of wigwam burners are contributing to pollution problems in Williams Lake, British Columbia. In 1985, the latest year for which data are available, total woodwaste production was about 800 million bd ft equivalent; only about 14% of this was used for energy recovery. In addition, about 66,000 m/sup 3/ of waste was sent to landfills after open burning. The characteristics of the local woodwaste are summarized, and available conversion technologies and the potential application of their products are reviewed. These include direct combustion, pyrolysis, gasification, liquefaction, and densification, for use in power generation, cogeneration, and the manufacture of saleable products. Environmental and legal aspects of woodwaste utilization are also outlined. Finally, options for reducing pollution from existing burners are reviewed. One option is the upgrading of existing burners; however, it is noted that ...
Based upon the existing regulatory cleanup criteria, remediation of this wetlands was proposed by the New Jersey Department of Environmental Protection and Energy (NJDEPE). This remedial process would have totally destroyed a thriving Old Field Wetlands. Site-Specific evaluation of the chemicals of potential concern (CPC), remaining source areas, potential environmental fate and transport (EF and T), toxicology (including oral absorption and bioaccumulation) and potential land use scenarios were conducted. It was determined that although the analytical chemistry data reported soil concentrations of arsenic, the compound used by the facility and discharged to the wetlands sediments was in fact gallium arsenide. Secondly, all remaining source areas and hot spots had previously been remediated. Vertical migration to soils had not progressed past a depth of 3 feet and groundwater/surface water did not contain significantly elevated concentrations of gallium arsenide. ...
Neutron capture cross sections of actinides are of great relevance for the Transmutation of Nuclear Waste in Accelerator Driven Systems (ADS) and Generation-IV reactors. The neutron capture cross sections of {sup 237}Np and {sup 240}Pu in the range of 1 eV to 2 keV were measured at the n-TOF facility with a Total Absorption Calorimeter. The data have been analyzed with the SAMMY code. The corresponding covariance matrices have been generated. The final cross sections are presented and compared to the previously existing ones.The n-TOF {sup 237}Np {sigma}(n,{gamma}) is in agreement with the evaluated data files below 300 eV and its is lower by 10 to 15% up to 2 keV. This discrepancy with the evaluated data files is also observed in the capture cross section derived from the transmission measurements of Gressier et al. In the case of the {sup 240}Pu {sigma}(n,{gamma}), the n-TOF {sigma}(n,{gamma}) agrees within uncertainties with JENDL-3.3 and ...
Valdez, Alaska achieved worldwide attention with the Exxon Valdez oil spill. This exacerbated an already polarized situation (industry, government, citizens, environmental groups) regarding the Valdez Terminal of the Trans Alaska Pipeline System. Other than spills, the major focus of environmental concern was and remains the Terminal`s Ballast Water Treatment Plant (BWTP) which discharges into Port Valdez. The previous NPDES wastewater discharge permits for this facility have been contentious for almost the entire period of pipeline operation. The draft NPDES permit is scheduled to be proposed for reissuance this year. However, a significant change has been initiated which so far is resulting in cooperation rather than confrontation between the various primary stakeholders. This presentation will explain how this change was initiated, how it is being maintained, and how what is happening could be a model for progress through cooperation. Although EPA and the Alaska ...
US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the ...
This paper describes the use of numerical analysis for studying natural convection cooling systems for long term storage of heat producing radioactive materials, including special nuclear materials and nuclear waste. The paper explains the major design philosophy, and shares the experiences of numerical modeling. The strategy of storing radioactive material is to immobilize nuclear high-level waste by a vitrification process, convertion it into borosilicate glass, and cast the glass into stainless steel canisters. These canisters are seal welded, decontaminated, inspected, and temporarily stored in an underground vault until they can be sent to a geologic repository for permanent storage. These canisters generate heat by nuclear decay of radioactive isotopes. The function of the storage facility ventilation system is to ensure that the glass centerline temperature does not exceed the glass transition temperature during storage and the vault concrete temperatures ...
Full text.This study focuses on the management of municipal solid waste (MSW) in Lebanon. It addresses the current status of MSW management in Lebanon in terms of collection, transport and disposal, infers the associated impacts of such practices and discusses mitigation measures and finally proposes basic guidelines for a national strategy for solid waste management in the country. The study is based on available previous investigations and on a field survey of 113 villages in four different countries. The study revealed the absence of an effective environmental policy and poor collection and disposal methods throughout the country, except for the Greater Beirut Area (G A), where better solid waste management practices are employed. Although collection of MSW outside GBA was found to be acceptable by local authorities, resources (labor and equipment) were not used efficiently. Furthermore, treatment of collected waste is almost not available. Waste collected is ...
In the last 30 years high energy physics could write an impressive story of success. Since the introduction of the Standard Model (SM), it has met every experimental test. However the final confirmation has to prove the mechanism of electroweak symmetry breaking, which could not be confirmed yet. The most favored theory, which includes the introduction of a Higgs field, could not be verified experimentally. Furthermore there is clear evidence, that the SM is only a low energy description of nature and its principles, as the SM describes only 4 % of the known matter in the universe. There are two different approaches in accelerator driven high energy physics to clarify the open questions. The Large Hadron Collider (LHC) have a good opportunity to measure some of the missing pieces with its high center of mass energy. The International Linear Collider (ILC) will then measure their parameters with high precision. To guarantee this high precision the detectors have to ...
About 25 years after the last edification of a new large high voltage institute at Technical University of Karlsruhe and about 10 years afte the edification of the test lab at Kaiserslautern University, the Brandenburg Technical University of Cottbus had the opportunity to design new high voltage test facilities from the very beginning on and to realize it in a very short time. To review the project from the first ideas followed by the planning and realization phase and the final commissioning of the technical equipment, this book should be a contribution to spred the experiences made among interested people and to demonstrate the actual technical possibilities. To ensure an international exchange of these experiences, all co-authors to the trouble to translate their participation's also to the English language. (orig.) [German] Etwa 25 Jahre nach dem letzten grossen hochspannungstechnischen Institutsneubau in der deutschen ...
In November 1995, the Australian and New Zealand Environment and Conservation Council (ANZECC, the Council of State and National Environment Ministers) adopted a National Management Plan for PCBs. This was a significant milestone in the very long saga of Australian efforts to develop public policy and management structures for dealing with persistent organochlorine wastes. The author was part of a four-person consultation panel that carried out a public involvement program to assist and inform the process of developing the National Management Plan. The program involved, among other things, visiting every state and territory of Australia at least twice. This paper describes the development and delivery of the public involvement program, including ongoing interactions with Governments. The latter is often a complex (and many would say an unduly complex) matter in the federal system, where primary responsibility for waste management resides in the individual state/territory jurisdictions. ...
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of ...
Developments made under this program will play a key role in underpinning the technology for producing EC devices. It is anticipated that the work begun during this period will continue to improve materials properties, and drive yields up and costs down, increase durability and make manufacture simpler and more cost effective. It is hoped that this will contribute to a successful and profitable industry, which will help reduce energy consumption and improve comfort for building occupants worldwide. The first major task involved improvements to the materials used in the process. The improvements made as a result of the work done during this project have contributed to the enhanced performance, including dynamic range, uniformity and electrical characteristics. Another major objective of the project was to develop technology to improve yield, reduce cost, and facilitate manufacturing of EC products. Improvements directly attributable to the work carried out as part of this project and ...
This report presents the results of work which included extensive modifications to HRI`s existing 3 ton per day Process Development Unit (PDU) and completion of the first PDU run. The 58-day Run 1 demonstrated scale-up of the Catalytic Two-Stage Liquefaction (CTSL Process) on Illinois No. 6 coal to produce distillate liquid products at a rate of up to 5 barrels per to of moisture-ash-free coal. The Kerr McGee Rose-SR unit from Wilsonville was redesigned and installed next to the US Filter installation to allow a comparison of the two solids removal systems. Also included was a new enclosed reactor tower, upgraded computer controls and a data acquisition system, an alternate power supply, a newly refurbished reactor, an in-line hydrotreater, interstage sampling system, coal handling unit, a new ebullating pump, load cells and improved controls and remodeled preheaters. Distillate liquid yields of 5 barrels/ton of moisture ash free coal were achieved. Coal slurry recycle rates were ...
Personnel radiation monitoring is essential to the operation of any nuclear facility and work in this area continues to strive for an accurate determination of personnel dose. In particular recent attention has been focused upon the need to improve the accuracy of neutron dosimetry, mainly because of their high Relative Biological Effectiveness. In this work the feasibility of using the NE-213 liquid scintillation detector as an efficient neutron/..gamma.. ray radiation monitor is demonstrated. Derivative method spectrum unfolding used in MATXUF for on-line analysis of fast neutron spectra has also been applied to real time ..gamma.. spectrum unfolding (MATXUF2), making possible simultaneous on-line monitoring of both fast neutrons and gammas. To eliminate the negative fluxes in the unfolded ..gamma.. spectra created by the photopeak-Compton edge combination in the plateau portion of the knee response, correcting equations using a linearized approximation to the ...
Personnel radiation monitoring is essential to the operation of any nuclear facility and work in this area continues to strive for an accurate determination of personnel dose. In particular recent attention has been focused upon the need to improve the accuracy of neutron dosimetry, mainly because of their high Relative Biological Effectiveness. In this work the feasibility of using the NE-213 liquid scintillation detector as an efficient neutron/#gamma# ray radiation monitor is demonstrated. Derivative method spectrum unfolding used in MATXUF for on-line analysis of fast neutron spectra has also been applied to real time #gamma# spectrum unfolding (MATXUF2), making possible simultaneous on-line monitoring of both fast neutrons and gammas. To eliminate the negative fluxes in the unfolded #gamma# spectra created by the photopeak-Compton edge combination in the plateau portion of the knee response, correcting equations using a linearized approximation to the electron ...
Personnel radiation monitoring is essential to the operation of any nuclear facility and work in this area continues to strive for an accurate determination of personnel dose. In particular recent attention has been focused upon the need to improve the accuracy of neutron dosimetry, mainly because of their high Relative Biological Effectiveness. In this work the feasibility of using the NE-213 liquid scintillation detector as an efficient neutron/gamma ray radiation monitor is demonstrated. Derivative method spectrum unfolding used in MATXUF for on-line analysis of fast neutron spectra has also been applied to real time gamma spectrum unfolding (MATXUF2), making possible simultaneous on-line monitoring of both fast neutrons and gammas. To eliminate the negative fluxes in the unfolded gamma spectra created by the photopeak-compton edge combination in the plateau portion of the knee response, correcting equations using a linearized approximation to the electron ...
The General-Purpose Heat Source (GPHS), an improved radioisotope heat source, employs a unique thermal insulation material, carbon-bonded carbon fiber (CBCF), to protect the fuel capsule and to help achieve the highest possible specific power. The CBCF insulation is made from chopped rayon fiber about 10 ..mu..m in diameter and 250 ..mu..m long, which is carbonized and bonded with phenolic resin particles. The CBCF shapes, both tubes and plates, are formed in a multiple molding facility by vacuum molding a water slurry of the carbonized chopped-rayon fiber (54 wt %) and phenolic resin (46 wt %). The molded shapes are subsequently dried and cured. Final carbonization of the resin is at 1600/sup 0/C. Machining to close tolerances (+-0.08 mm) is accomplished by conventional tooling and fixturing. The resulting material is an excellent lightweight insulation with a nominal density of 0.2 Mg/m/sup 3/ and a thermal conductivity of 0.24 W(m.K) in ...
Full text: The site selection process for a near surface repository dedicated for the radioactive waste resulted from the Cernavoda NPP operation and decommissioning started early in 90's. Each site selection stage included the collection of data from specific field and laboratory works as well as the appropriate safety performance evaluation. In order to assess/confirm the performance of the natural barrier of the Saligny site, the radionuclide concentration in the disposal system compartments has been evaluated, as complementary safety indicator of repository. The siting process was made in accordance with national and international regulations and standards and using a conceptual design similar to those used at L'Aube (France), ElCabril (Spain) or Mohovce (Slovak Republic). ANDRAD, the Romanian waste management organization that has continued the siting process in the last three years applied and obtained a partial siting license from CNCAN in 2008. In 2009, ANDRAD has to prepare ...
The purpose of this study is to investigate the feasibility of visualization and void fraction measurement of air-water two-phase flow in a small diameter tube (I.D.: 4.08 mm) by using the real-time neutron radiography and image processing techniques. Video images of two-phase flow were taken by using the real-time neutron radiography system (thermal neutron radiography facility No.2) installed at the Japan Research Reactor 3M of the Japan Atomic Energy Research Institute. The shape of bubbles and its moving behavior were clearly observed from the video images. The image corrections for dark current, shading, field intensity fluctuation and electrical system drift were examined in order to measure the void fraction from the video images. Though, generally speaking, the effect of the scattered neutron could not be ignored for quantification of the images taken by the neutron radiography, the scattered neutron could not affect the final results ...
The purpose of this study is to investigate the feasibility of visualization and void fraction measurement of air-water two-phase flow in a small diameter tube (inner diameter; 4.08mm) by using the real-time neutron radiography and image processing techniques. Video images of two-phase flow were taken by using the real-time neutron radiography system (thermal neutron radiography facility No.2) installed at the Japan Research Reactor 3 M of the Japan Atomic Energy Research Institute. The shape of bubbles and its moving behavior were clearly observed from the video images. The image corrections for dark current, shading, field intensity fluctuation and electrical system drift were examined in order to measure the void fraction from the video images. Though, generally speaking, the effect of the scattered neutron could not be ignored for quantification of the images taken by the neutron radiography, the scattered neutron could not affect the final ...
The purpose of this study is to investigate the feasibility of visualization and void fraction measurement of air-water two-phase flow in a small diameter tube (I.D.: 4.08 mm) by using the real-time neutron radiography and image processing techniques. Video images of two-phase flow were taken by using the real-time neutron radiography system (thermal neutron radiography facility No.2) installed at the Japan Research Reactor 3M of the Japan Atomic Energy Research Institute. The shape of bubbles and its moving behavior were clearly observed from the video images. The image corrections for dark current, shading, field intensity fluctuation and electrical system drift were examined in order to measure the void fraction from the video images. Though, generally speaking, the effect of the scattered neutron could not be ignored for quantification of the images taken by the neutron radiography, the scattered neutron could not affect the final results ...
Over the past 40 years, cavern storage of LPG's, petrochemicals, such as ethylene and propylene, and other petroleum products has increased dramatically. In 1991, the Gas Processors Association (GPA) lists the total U.S. underground storage capacity for LPG's and related products of approximately 519 million barrels (82.5 million cubic meters) in 1,122 separate caverns. Of this total, 70 are hard rock caverns and the remaining 1,052 are caverns in salt deposits. However, along the eastern seaboard of the U.S. and the Pacific northwest, salt deposits are not available and therefore, storage in hard rocks is required. Limited demand and high cost has prevented the construction of hard rock caverns in this country for a number of years. The storage of natural gas in mined caverns may prove technically feasible if the geology of the targeted market area is suitable; and economically feasible if the cost and convenience of service is competitive with alternative available ...
The Savannah River Site (SRS) is currently developing a new facility, the Actinide Packaging and Storage Facility (APSF), to process and store legacy materials from the United States nuclear stockpile. A variety of materials, with a variety of properties, packaging and handling/storage requirements, will be processed and stored at the facility. Since these materials are hazardous and radioactive, automation will be used to minimize worker exposure. Other benefits derived from automation of the facility include increased throughput capacity and enhanced security. The diversity of materials and packaging geometries to be handled poses challenges to the automation of facility processes. In addition, the nature of the materials to be processed underscores the need for safety, reliability and serviceability. The application of automation in this facility must, ...
The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades.
A limited program of field measurements was undertaken in order to define the wind characteristics of the DOE/Sandia vertical axis wind turbine test facility. Because micrometeorological conditions under which a particular wind turbine is tested may have ...
This report provides the results of a JASON review of the technical feasibility of using the Department of Energy`s (DOE`s) Fast Flux Test Facility (FFTF) to generate tritium needed for the enduring United States nuclear weapons stockpile.
A brief overview of the conceptual design of a solar central receiver system integrated with an existing cogeneration facility is provided. A synopsis of the performance and economic evaluation, and an assessment of the concept from the site owner's perspective are given.
The results of the two most recently completed runs at the Wilsonville Advanced Coal Liquefaction Research and Development Facility are presented. In Run 255, initial screening of operating conditions for the liquefaction of a Texas lignite was completed....
Two cases of pulmonary alveolar proteinosis, including one death, occurred in workers at a facility producing indium-tin oxide (ITO), a compound used in recent years to make flat panel displays. Both...Full Text Available
The Heat Cycle Research Facility (HCRF) is an experimental binary-cycle facility used to investigate different concepts and/or components for generating electrical power from a geothermal resource. This report briefly desc
... Radon gas concentrations are measured using instruments with calibrations traceable to the UK National Physical Laboratory and PTB, Germany. The primary facility is a 43 m3 walk-in chamber accessed by an airlock. Radon gas is maintained at a level in this chamber that is ...
Thirty-seven papers were presented at this conference in five sessions. Topics covered include regulation, control and consequences of decontamination; decontamination of components and facilities; chemical and non-chemical methods of decontamination; and TMI decontamination experience.
In the study three loss-of-feedwater type experiments which were preformed with the PACTEL facility has been calculated with two computer codes. The purpose of the experiments was to gain information about the behaviour of horizontal steam generator in a ...
...capacity, and ownership of all planned and existing onshore pipelines, storage facilities, refineries, petrochemical...will be served by the port, including: (i) Onshore pipelines; (ii) Storage facilities; (iii)...
The Department of Energy (DOE) currently operates four thermal treatment facilities that are permitted under regulations for hazardous waste combustors. As regulations become more stringent and public stakeholders become more influential, permitting these facilities is increasingly difficult. As they become more available, continuous emission monitors (CEMs) may offer the potential to assure regulators and the public of the safe operation of treatment facilities. The Mixed Waste Focus Area (MWFA) has participated in the development and testing of a variety of CEMs that could have application to DOE facilities.
This study is an evaluation of the potential environmental impacts of contaminated groundwater from the ASARCO metals refining facility adjacent to the ...
The 2nd periodical inspection was carried out on the asphalt solidification facility and the incinerator in Unit 2 of the Sendai Nuclear Power Station from November 5 to 28, 1985. Inspection was made in radiation control facility and disposal facility. By external appearance, disassembly, function and performance tests there were observed no abnormalities. The personnel exposure doses during the inspection were below the permissible level. In the inspection, improvement etc. works were not done. (Mori, K.).
The regular inspection of No.2 plant in Sendai Nuclear Power Station was carried out from January 7 to February 8, 1985. The summary of the results of this regular inspection is as follows. The facilities as the object of inspection were radiation control facilities and waste facilities. On these facilities as the object of inspection, the appearance, disassembling, functional, performance and other inspections were carried out, and as the results, abnormality was not found at all. The works related to this regular inspection were accomplished within the range of the allowable radiation dose based on the relevant laws. (Kako, I.).
The purpose of this document is to describe the NIF Project Organization and the roles and responsibilities of the managers charged with executing the Project.
The ANDRA, the French national agency of radioactive wastes, is organizing today the information needs of tomorrow. The aim is to allow the future generations to have access to the knowledge of the existence of subsurface radioactive waste facilities and to understand the context and technologies of such facilities. The storage of this information is made on 'permanent paper', a high resistant paper with a lifetime of 600 to 1000 years. An updating of these data is made every 5 years for each waste disposal center. Another project, still in progress, concerns the memory management of deep geologic waste disposal facilities for which the time scale to be considered is of the order of millennia. (J.S.)
The DP West Plutonium Facility operated by the Los Alamos National Laboratory, Los Alamos, New Mexico, was decontaminated between April 1978 and April 1981. The facility was constructed in 1944 to 1945 to produce plutonium metal and fabricate parts for nuclear weapons. It was continually used as a plutonium processing and research facility until mid-1978. Decontamination operations included dismantling and removing gloveboxes and conveyor tunnels; removing process systems, utilities, and exhaust ducts; and decontaminating all remaining surfaces. This report describes glovebox and conveyor tunnel separations, decontamination techniques, health and safety considerations, waste management procedures, and costs of the operation.
Jet Propulsion Laboratory. California Institute of Technology. Pasadena, California. Energy and Water Conservation. Steve Rigdon. Facilities Energy Manager ...
... is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP ...
... projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan, without ...
In order to assess whether an oil shale test facility would be of significant use to private sector oil shale developers, the US DOE has studied the past history of oil shale development and its potential for replacing petroleum supplies. A generic test facility's primary function would be to test concepts of mining, retorting, upgrading, and environmental aspects at the engineering scale. This paper summarizes the US oil shale resources, gives a technology analysis, and discusses the potential for a test facility.
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
A decision must be made regarding whether the United State`s stockpile of neptunium should be discarded into the waste stream or kept for the production of Pu-238. Although the cost of long term storage is not inconsequential, to dispose of the material means the closing of our option to maintain control over our Pu-238 stockpile. Within the Fuels and Materials Examination Facility at Hanford there exists a remotely operated facility that can be converted for neptunium storage. This paper describes the facility and the anticipated handling requirements.
This report describes a high explosives test facility that makes efficient use of equipment and combines utility, convenience, and safety in a modest amount of space. It is a dedicated facility for exploratory development efforts that previously were conducted in a single room having very limited capabilities. Two explosives testing areas are now available and several projects are supported concurrently.
The free electron laser (FEL) FLASH at DESY in Hamburg is the first x-ray FEL ever built. Many new developments were necessary in order to exploit the unique properties of this novel light source for scientific experiments. The facility has constantly been improved and several major upgrades have been made or are currently underway. This paper reviews the main characteristics of the user facility as well as the major developments and upgrades.
A thermal neutron imaging facility for real-time neutron radiography and computed tomography has recently been developed and built at the University of Texas TRIGA reactor. Herein the authors present preliminary results of radiography and tomography test experiments. These preliminary results showed that the beam is of high quality and is suitable for radiography and tomography applications. A more detailed description of the facility is given elsewhere.
A thermal neutron imaging facility for real-time neutron radiography and computed tomography has recently been developed and built at the University of Texas TRIGA reactor. Herein the authors present preliminary results of radiography and tomography test experiments. These preliminary results showed that the beam is of high quality and is suitable for radiography and tomography applications. A more detailed description of the facility is given elsewhere
This monograph addresses a narrow aspect of cold regions engineering, namely the effects of cold weather on the traditional civil engineering disciplines of hydrology and hydraulics. Hydrologic and hydraulic considerations in the design, construction, and operation of civil works are very important. Many of the problems encountered in the design and construction of buildings, transportation systems, water supply facilities, waste treatment facilities, and hazardous waste disposal facilities, for example are closely tied to the characteristics of the site hydrology.
The presentation gives a brief insight on possibility of using the VEERA facility in studying the stratification phenomenon. The idea for such experiments is to use the facility upper plenum part to simulate the conditions in upper part of horizontal steam generator hot collector. The upper part of steam generator hot collector is one of the locations where the stratification can take part during natural circulation mode. 4 refs.
Significant environmental issues and regulatory proceedings in Alberta were discussed. The Mackenzie Valley Pipeline Project was reviewed in relation to the Deh Cho First Nation's advanced actions in the federal court to enjoin the review panel from proceeding with the review process. The Deh Cho First Nation is seeking a declaration that the plan violates their rights under the Canadian Charter of Rights and Freedoms and the Constitution Act. Various regulatory and government agencies have now developed a plan to coordinate their different regulatory processes and approvals in the Cooperation Plan for the Environmental Impact Assessment and Regulatory Review of the Northern Gas Pipeline project. The Deh Cho allege that they were not afforded the opportunity to participate in the development and implementation of the plan. A review panel plans to proceed once the environmental and social impacts are determined, and the consortiums plan to minimize harm has been submitted. ...
The radionuclide characteristics of light-water-reactor (LWR) spent fuel play key roles in the design and licensing activities for radioactive waste transportation systems, interim storage facilities, and the final repository site. Several areas of analysis require detailed information concerning the time-dependent behavior of radioactive nuclides including (1) neutron/gamma-ray sources for shielding studies, (2) fissile/absorber concentrations for criticality safety determinations, (3) residual decay heat predictions for thermal considerations, and (4) curie and/or radiological toxicity levels for materials assumed to be released into the ground/environment after long periods of time. The crucial nature of the radionuclide predictions over both short and long periods of time has resulted in an increased emphasis on thorough validation for radionuclide generation/depletion codes. Current radionuclide generation/depletion codes have the ...
The inner part of a fusion reactor will have to operate at very high neutron loads. In steady-state reactors the minimum fluence before the scheduled replacement of the reactor core should be at least l0-15 Mw.yr/m2. A more frequent replacement of the core is hardly compatible with economic constraints. A most recent summary of the discussions of these issues is presented in Ref. [l]. If and when times come to build a commercial fusion reactor, the availability of information on the behavior of materials and components at such fluences will become mandatory for making a final decision. This makes it necessary an early development and construction of a neutron source for fusion material and component testing. In this paper, we present information on one very attractive concept of such a source: a source based on a so called Gas Dynamic Trap. This neutron source was proposed in the mid 1980s (Ref. [2]; see also a survey [3] with discussion of ...
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 409: Other Waste Sites, Tonopah Test Range (TTR), Nevada, in accordance with the Federal Facility Agreement and Consent Order. Located near Area 3 on the TTR approximately 140 miles northwest of Las Vegas, Nevada, CAU 409 is comprised of three Corrective Action Sites (CASs): CAS RG-24-001-RGCR, Battery Dump Site; CAS TA-53-001-TAB2, Septic Sludge Disposal Pit (referred to as Septic Sludge Disposal Pit No.1); CAS TA-53-002-TAB2, Septic Sludge Disposal Pit (referred to as Septic Sludge Disposal Pit No.2). This CADD/CR identifies and rationalizes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no corrective action is deemed necessary for CAU 409. The CADD/CR have been combined into one report based on sample data collected during the field ...
We report on a recent search for {bar {nu}}{sub e} appearance from stopped {pi}{sup +} {yields} {mu}{sup +}{nu}{sub {mu}} and {mu}{sup +} {yields} e{sup +}{nu}{sub e}{bar {nu}}{sub {mu}} decay made by the LAMPF experiment E645. The appearance of {bar {nu}}{sub e} may occur from {bar {nu}}{sub {mu}} {yields} {bar {nu}}{sub e}, {nu}{sub e} {yields} {bar {nu}}{sub eL}, or {nu}{sub {mu}} {yields} {bar {nu}}{sub eL} oscillations. Appearance may also occur from rare {mu}{sup +} {yields} e{sup +}{bar {nu}}{sub e}{nu}{sub {mu}} decay, which is allowed by a multiplicative lepton charge conservation law. The neutrino energies range from E{sub {nu}} = 0 to 52.8MeV. The neutrino detector, which is located 26.1 meters from the neutrino source, consists of a segmented liquid scintillator and proportional drift tube central detector surrounded by both active and passive shielding. The central detector detects {bar {nu}}{sub e} through the {bar {nu}}{sub e}p {yields} ne{sup +} Charge Current (CC) ...
The main subject of this thesis is the study of the hardronic final state in deep-inelastic electron-proton scattering. Theexperiment described in this thesis is performed with such a high resolution that the substructure of the proton is probed by the electron beam with a resolution of less than 10{sup -15} cm. (orig./HSI).
This is the final Report for the technical ''on-the-job traning'' for the Wolsung CANDU nuclear power plant which is the first Pressurized Heavy Water Reactor setting up in Korea. The technical ''on-the-job traning'' was established to increase the capabi...
The longitudinal and transverse dynamics of a heavy ion fusion beam during the drift compression and final focus phase is studied. A lattice design with four time-dependent magnets is described that focuses the entire beam pulse onto a single focal point with the same spot size.
A progress report is presented on development of the WIPS computer code, a special purpose code for analysis of whip and impact in nuclear power piping. The computer code and final report are expected to be complete in December 1981. This progress report is an incomplete version of the final report, representing approximately 40% of the volume of the final report. Some sections in the report are complete, some are partially complete, and others are omitted. The report is intended to inform prospective WIPS users of the procedures, theories, and documentation standards which will be used for the computer code and the final report.
This ACDR was performed following completed of the Conceptual Design Report in July 1992; the work encompassed August 1992 to January 1994. Mission of the WRAP Module 2A facility is to receive, process, package, certify, and ship for permanent burial at the Hanford site disposal facilities the Category 1 and 3 contact handled low-level radioactive mixed wastes that are currently in retrievable storage at Hanford and are forecast to be generated over the next 30 years by Hanford, and waste to be shipped to Hanford from about DOE sites. This volume provides an introduction to the ACDR process and the scope of the task along with a project summary of the facility, treatment technologies, cost, and schedule. Major areas of departure from the CDR are highlighted. Descriptions of the facility layout and operations are included.
Multi-kilo-electron-volt x-ray microscopy will be an important laser-produced plasma diagnostic at future megajoule facilities such as the National Ignition Facility (NIF). However, laser energies and plasma characteristics imply that x-ray microscopy will be more challenging at NIF than at existing facilities. We use analytical estimates and numerical ray tracing to investigate several instrumentation options in detail, and we conclude that near-normal-incidence single spherical or toroidal crystals may offer the best general solution for high-energy x-ray microscopy at NIF and similar large facilities. Apertured Kirkpatrick{endash}Baez microscopes using multilayer mirrors may also be good options, particularly for applications requiring one-dimensional imaging over narrow fields of view. {copyright} 1998 Optical Society of America
This report estimates the economic and financial effects and the benefits of compliance with the proposed effluent limitations guidelines and standards for the Centralized Waste Treatment (CWT) industry. The Environmental Protection Agency (EPA) has measured these impacts in terms of changes in the profitability of waste treatment operations at CWT facilities, changes in market prices to CWT services, and changes in the quantities of waste management at CWT facilities in six geographic regions. EPA has also examined the impacts on companies owning CWT facilities (including impacts on small entities), on communities in which CWT facilities are located, and on environmental justice. EPA examined the benefits to society of the CWT effluent limitations guidelines and standards by examining cancer and non-cancer health effects of the regulation, recreational benefits, and cost savings to publicly owned ...
The neutron radiography facility was installed at the tangential beam port of the 3 MW TRIGA MARK-II research reactor. In the facility only direct film neutron radiography method is being used. The project involves development of electronic imaging system for real time neutron radiography in the existing facility with the aim of utilizing it for research and industrial applications. In establishing the electronic imaging system for real time neutron radiography the improvements of existing facility were almost done during this period. In parallel, the former facility was used for the research: (a) A study of wood and wood plastic composites with and without additive by using film neutron radiography and (b) A study of jute reinforced polymer composites by using film neutron radiography technique. (author)
The Materials & Fuel Complex (MFC) facilities 799 Sodium Processing Facility (a single building consisting of two areas: the Sodium Process Area (SPA) and the Carbonate Process Area (CPA), 799A Caustic Storage Area, and 770C Nuclear Calibration Laboratory have been declared excess to future Department of Energy mission requirements. Transfer of these facilities from Nuclear Energy to Environmental Management, and an associated schedule for doing so, have been agreed upon by the two offices. The prerequisites for this transfer to occur are the removal of nonexcess materials and chemical inventory, deinventory of the calibration source in MFC-770C, and the rerouting and/or isolation of utility and service systems. This report provides a description of the current physical condition and any hazards (material, chemical, nuclear or occupational) that may be associated with past operations of these ...
This report presents results of the 1st regular inspection of the No.2 unit of the Sendai Nuclear Power Plant. It was carried out during the period from September 22, 1986, to December 24, 1986. The inspection covered the main unit of the nuclear reactor, facilities for the nuclear reactor cooling system, facilities for the instrumentation control system, fuel facilities, radiation control facilities, disposal facilities, nuclear reactor containment facilities, and emergency power generation system. Checking of appearance, disassemblage, leak and functions-performance of these facilities was conducted and no abnormalities were found. All operations involved in the inspection were performed under conditions within the permissible dose as specified in the applicable laws. No major modification work was carried out during the period of the ...
This report presents results of the 1st regular inspection of the No. 2 unit of the Sendai Nuclear Power Plant. It was carried out during the period from September 22, 1986, to December 24, 1986. The inspection covered the main unit of the nuclear reactor, facilities for the nuclear reactor cooling system, facilities for the instrumentation control system, fuel facilities, radiation control facilities, disposal facilities, nuclear reactor containment facilities, and emergency power generation system. Checking of appearance, disassemblage, leak and functions-performance of these facilities was conducted and no abnormalities were found. All operations involved in the inspection were performed under conditions within the permissible dose as specified in the applicable laws. No major modification work was carried out during the period of the ...
In the fuel testing facilities of Japan Atomic Energy Research Institute, the post-irradiation test of practical fuel used in nuclear power stations was begun in December, 1979, and the soundness of practical fuel has been confirmed, and the valuable post-irradiation test data on the behavior of fuel have been acquired. Recently, the heightening of fuel burnup has been advanced, and also in fuel testing facilities, the development and preparation of the post-irradiation testing facility required for examining in detail high burnup fuel have been carried out. The course of the installation of the post-irradiation testing facility and the outline of the facility are reported. As the preparation of the post-irradiation testing facility for high burnup fuel, a hyperfine hardness tester that measures dynamic hardness, the measuring instrument for pellet thermal ...
The power source facilities of JT-60 consist of poloidal magnetic coil power source, toroidal magnetic coil power source, the power generation facility for heating, operation power distribution facility and secondary cooling facility, and at the time of the experiment operation of JT-60, they supply 1300 MVA of instantaneous maximum power to loads. The component machinery and equipment of the power source facilities are installed in about 20 indoor and outdoor places, and their mounted parts are about 15,000 kinds. About 3,000 kinds of spare parts are preserved in 15 exclusively used stores. The managing system for mounted parts and spare parts of JT-60 power source facilities which possesses the functions of rapidly and efficiently carrying out the storage of large quantity of information, mutual relating and retrieval by making mounted parts and spare parts ...
This study examined the atmospheric pollution created by some waste treatment and disposal facilities in the State of Kuwait. Air monitoring was conducted in a municipal wastewater treatment plant, an industrial wastewater treatment plant established in a petroleum refinery, and at a landfill site used for disposal of solid wastes. Such plants were selected as models for waste treatment and disposal facilities in the Arabian Gulf region and elsewhere. Air measurements were made over a period of 6 months and included levels of gaseous emissions as well as concentrations of volatile organic compounds (VOCs). Samples of gas and bioaerosols were collected from ambient air surrounding the treatment facilities. The results obtained from this study have indicated the presence of VOCs and other gaseous pollutants such as methane, ammonia, and hydrogen sulphide in air surrounding the waste treatment and disposal ...
Effect of final temperature and duration of coking on the properties of formed coke from weakly-caking Donetsk and Kuznetsk coals was studied. An increase of the final temperature to 850 C produced significant changes in the mechanical and chemical properties of the coke. Increasing the temperature beyond this point did not affect the mechanical strength significantly, but did increase hardness, real density and electroconductivity of the coke and decrease reactivity. Increasing the period of coking at final temperatures in the 650 and 750 C range, produced insignificant hardening of the formed coke. An objective evaluation of the effect of final temperature can be performed by a series of tests which characterize the resistivity of the formed coke to impact and abrasion and the fine structure of the matter in coke. 9 references.
Full text: Korea Atomic Energy Research Institute (KAERI) has many R and D facilities in operation. including HANARO research reactor, radioactive waste treatment facility (RWTF), post-irradiation examination facility (PIEF) and irradiated material test facility (IMEF). Recently. nation-wide interest is focused on the safety and security of major industrial facilities. Safe operation of nuclear facilities is imperative because of the consequence of public disaster by radiological release/contamination, in case of an accident. Recently, Ministry of Science and Technology (MOST) of the Korean government announced amendments of Atomic Energy laws to enforce requirements of the physical protection and radiological emergency. All provisions on nuclear safety regulation and radiation protection are entrusted to the Atomic Energy Act(AEA). The Act is enacted as the ...
The paper briefly describes the nuclear reactor facilities at Sandia Laboratories which are used for simulating nuclear weapon produced neutron environments. These reactor facilities are used principally in support of continuing R and D programs for the Department of Energy/Office of Military Application (DOE/OMA) in studying the effects of radiation on nuclear weapon systems and components. As such, the reactors are available to DOE and DOD agencies and their contractors responsible for the radiation hardening of advanced nuclear weapon systems. Emphasis is placed upon two new reactor simulation sources; the Sandia Pulse Reactor-III (SPR-III) Facility which enhances the neutron exposure volume capabilities over those presently available with the existing SPR-II Facility, and the Upgraded Annular Core Pulse Reactor (ACPR) Facility which enhances the neutron exposure capabilities ...
This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. ...
This hazard analysis (HA) has been prepared for the 300 Area N Reactor Fuel Fabrication and Storage Facility (Facility), in compliance with the requirements of Westinghouse Hanford Company (Westinghouse Hanford) controlled manual WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual, and to the direction of WHC-IP-0690, Safety Analysis and Regulation Desk Instructions, (WHC 1992). An HA identifies potentially hazardous conditions in a facility and the associated potential accident scenarios. Unlike the Facility hazard classification documented in WHC-SD-NR-HC-004, Hazard Classification for 300 Area N Reactor Fuel Fabrication and Storage Facility, (Huang 1993), which is based on unmitigated consequences, credit is taken in an HA for administrative controls or engineered safety features planned or in place. The HA is the foundation for the accident analysis. The ...
Radioisotope facilities were operated to support research, development and production of radioisotopes. Irradiation facilities were operated to offer irradiation service to the clients. Even though intensive periodical checks and some essential maintenance had been carried out the results of RI facility maintenance seemed to be not much satisfactory due mainly to the shortage of skilled manpower and maintenance expenses. High intensity {gamma} irradiator was normally operated 426 times for overall 3,440 hrs, and the low intensity {gamma} irradiator was operated 157 times for overall 11,092 hrs, respectively. (author)
This paper examines the availability and adequacy of schools' infrastructural facilities for implementation of the Universal Basic Education program in Nigeria. Adopting the "ex post facto" design, the researchers used existing school data on physical facilities, including a survey of key stakeholders in the education sector. Data analysed revealed inadequacy of physical facilities for effective implementation of the UBE program. It was accordingly recommended that government at the national, state and local levels show better commitment to the implementation of the Universal Basic Education program. (Contains 3 figures and 4 tables.)
With 13 experimental facilities under construction to become available during the first year of SINQ operation, a nearly complete suite of options for users will be made available to carry out research with neutrons at PSI. Three more facilities are under design and will come on line somewhat later. To complete the suite, three more specialized instruments are being evaluated. SINQ being a novel neutron source concept, significant scope for improvement is also seen on the source side. It is a major goal of PSI to exploit these opportunities and to make - among others - use of neutron instruments to carry out the necessary research. (author) 9 figs., 1 tab., 11 refs.
This document defines the services the Waste Sampling and Characterization Facility (WSCF) shall provide the Effluent and Environmental Monitoring Program (EEM) throughout the calendar year for analysis. The purpose of the EEM Program is to monitor liquid and gaseous effluents, and the environment immediately around the facilities which may contain radioactive and hazardous materials. Monitoring data are collected, evaluated, and reported to determine their degree of compliance with applicable federal and state regulations and permits.
The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planning assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily.
This report is the first revision to ``Radiological Performance Assessment for the E-Area Vaults Disposal Facility, Revision 0'', which was issued in April 1994 and received conditional DOE approval in September 1994. The title of this report has been changed to conform to the current name of the facility. The revision incorporates improved groundwater modeling methodology, which includes a large data base of site specific geotechnical data, and special Analyses on disposal of cement-based wasteforms and naval wastes, issued after publication of Revision 0.
Real-time neutron radiography (RTNR) is rapidly becoming a valuable tool for nondestructive testing and basic research with a wide variety of applications. The Phoenix Memorial Laboratory (PML) at the University of Michigan has developed an RTNR facility and has been using this facility to study several phenomena of interest to researchers in many areas. These phenomena include imaging of the internal fluid flow in gas turbine engine nozzles and coking and debris deposition in several gas turbine nozzles. This paper presents a summary of the technique and facilities involved in these applications.
This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 {open_quotes}Nuclear Facilities{close_quotes}. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP.
The Systems Design Study (SDS) identified technologies available for the remediation of low-level and transuranic waste stored at the Radioactive Waste Management Complex's Subsurface Disposal Area at the Idaho National Engineering Laboratory. The SDS study intentionally omitted the costs of transportation and disposal of the processed waste and the cost of decommissioning the processing facility. This report provides a follow-on analysis of the SDS to explore the basis for life-cycle cost segments of transportation, disposal, and facility decommissioning; to determine the sensitivity of the cost segments; and to quantify the life-cycle costs of the 10 ex situ concepts of the Systems Design Study.
The Systems Design Study (SDS) identified technologies available for the remediation of low-level and transuranic waste stored at the Radioactive Waste Management Complex`s Subsurface Disposal Area at the Idaho National Engineering Laboratory. The SDS study intentionally omitted the costs of transportation and disposal of the processed waste and the cost of decommissioning the processing facility. This report provides a follow-on analysis of the SDS to explore the basis for life-cycle cost segments of transportation, disposal, and facility decommissioning; to determine the sensitivity of the cost segments; and to quantify the life-cycle costs of the 10 ex situ concepts of the Systems Design Study.
There is a general concern with insiders smuggling bomb quantities of explosives into sensitive facilities such as nuclear facilities. At this time, there is no single explosives detection device that is suitable for monitoring personnel and their packages for explosives in an operational facility environment. However, there are techniques combining available commercial technologies with procedures and threat analysis that can significantly increase the insiders risk and reduce the population of adversaries. This paper describes the available applicable explosives detection technologies and discusses the techniques that could be implemented on an interim basis. It is important that these techniques be considered, so that some interim level of security against the explosives threat can be established until more sophisticated equipment that is under development becomes available.
The ongoing upgrade of the Los Alamos Free-Electron Laser (FEL) Facility involves the addition of a photoelectric injector (PEI) and acceleration capability to about 40 MeV. The electron-beam and high-speed diagnostics provide key measurements of charge, beam position and profile, divergence emittance, energy (centroid, spread, slew, and extraction efficiency), micropulse duration, and phase stability. Preliminary results on the facility include optical transition radiation interferometer measurements of divergence (1 to 2 mrad), FEL extraction efficiency (0.6 {plus minus} 0.2%), and drive laser phase stability (< 2 ps (rms)). 10 refs.
The ongoing upgrade of the Los Alamos Free-Electron Laser (FEL) Facility involves the addition of a photoelectric injector (PEI) and acceleration capability to about 40 MeV. The electron-beam and high-speed diagnostics provide key measurements of charge, beam position and profile, divergence emittance, energy (centroid, spread, slew, and extraction efficiency), micropulse duration, and phase stability. Preliminary results on the facility include optical transition radiation interferometer measurements of divergence (1 to 2 mrad), FEL extraction efficiency (0.6 {plus_minus} 0.2%), and drive laser phase stability (< 2 ps [rms]). 10 refs.
A thermal neutron imaging facility for real-time neutron radiography and computed tomography has been developed at the University of Texas reactor. The facility produced good-quality radiographs and two-dimensional tomograms. Further developments have been recently accomplished. A computer software has been developed to automate and expedite the data acquisition and reconstruction processes. Volume tomographic visualization using Interactive Data Language (IDL) software has been demonstrated and will be further developed. Volume tomography provides the additional flexibility of producing slices of the object using software and thus avoids redoing the measurements.
The High Exposure Facility is a collimated high-level gamma irradiator that is located in the basement of the 318 building. It was custom developed by PNNL back in 1982 to meet the needs for high range radiological instrument calibrations and dosimeter irradiations. At the time no commercially available product existed that could create exposure rates up to 20,000 R/h. This document is intended to pass on the design criteria that was employed to create this unique facility, while maintaining compliance with ANSI N543-1974, "General Safety Standard for Installations Using Non-Medical X-Ray and Sealed Gamma-Ray Sources, Energies up to 10 MeV."
This report covers the gamma detectors, measurement instrumentation, and testing results of a system developed at Los Alamos National Laboratory. This system monitors the process liquid waste streams at the Plutonium Facility (TA-55) for the presence of radioactive contamination. The detectors are at various points on the acid, caustic, and industrial waste lines. Two of the detectors are on the sanitary sewer lines from the facility. A custom interface unit associated with these two detectors furnishes the facility operation center with a notification of the detection of material. All of the detectors furnish measurement information to a central computer system for storage and trending.
This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.
The report presents a summary of the work of the Department of Nuclear Safety Research and Nuclear Facilities in 1995. The department`s research and development activities are organized in three research programmes: Radiation Protection, Reactor Safety, and Radioanalytical Chemistry. The nuclear facilities operated by the department include the Research Reactor DR3, the Isotope Laboratory, the Waste Treatment Plant, and the Educational Reactor DR1. Lists of staff and publications are included together with a summary of the staff`s participation in national and international committees. (au) 5 tabs., 21 ills.
The Fast Flux Test Facility has provided a very useful framework for testing the advances in Liquid Metal Reactor Safety Technology. During the licensing phase, the switch from a nonmechanistic bounding technique to the mechanistic approach was developed and implemented. During the operational phase, the consideration of new tests and core configurations led to use of the anticipated-transients-without-scram approach for beyond design basis events and the move towards passive safety. The future role of the Fast Flux Test Facility may involve additional passive safety and waste transmutation tests. 26 refs.
In the geological disposal facility of the high-level radioactive waste, a group of galleries is designed in parallel at the depth of more than 300 m below surface. This is an unprecedented structure in the field of conventional engineering, and it is necessary to take this characteristic into consideration in the design of the galleries. In the geological disposal facility, as well as ensuring the dynamic stability of the gallery during construction and operational periods, it is necessary to evaluate the EDZ adequately for long-term stability after the closure. In this study, analysis of the 'multi tunnels model' which represents the whole gallery group was performed and the results about the outbreak behavior of EDZ were summarized. (author)
Sep 1, 2011 ... Recent wildfires in interior Alaska have left substantial volumes of burned timber, potentially usable for biomass energy. Motivated,in part, by ...
The United State Domestic Research Reactor Infrastructure Program at the Idaho National Laboratory manages and provides project management, technical, quality engineering, quality inspection and nuclear material support for the United States Department of Energy sponsored University Reactor Fuels Program. This program provides fresh, unirradiated nuclear fuel to Domestic University Research Reactor Facilities and is responsible for the return of the DOE-owned, irradiated nuclear fuel over the life of the program. This presentation will introduce the program management team, the universities supported by the program, the status of the program and focus on the return process of irradiated nuclear fuel for long term storage at DOE managed receipt facilities. It will include lessons learned from research reactor facilities that have successfully shipped spent fuel elements to DOE receipt facilities.
contaminated groundwater from the ASARCO metals refining facility ... ditch or creek crossing the ASARCO property at its northern end) and one at its ...
In this paper we present status and developments of the Duke storage ring facility. The Duke storage ring facility provides the unique combination of phase-locked light sources ranging from high power OK-4 XUV FEL to quasimonochromatic {gamma}-ray beam and IR/X-ray spontaneous radiation. The XUV OK-4 FEL, which is collaborative project with BlNP, Novosibirsk, is in operation since November, 1996. The OK-4 UV FEL is also used for production of nearly monochromatic {gamma}-ray s with tunable energy. We present the results of UV lasing with the OK4 FEL and selected results of its applications. We will discuss our future plans for extension of this source and status of the construction of dedicated used facility adjacent to the FEL building. (author)
The PANDA test facility at the Paul Scherrer Institute is used to study the long-term performance of the Simplified Boiling Water Reactor's passive containment cooling system. The PANDA tests demonstrate performance on a larger scale than previous tests and examine the effects of any non-uniform spatial distributions of steam and non-condensable gases in the system. The facility is in 1:1 vertical scale and 1:25 scale for volume, power etc. Extensive facility characterization tests and steady-state passive containment condenser performance tests are presented. The results of the base case test of a series of transient system behaviour tests are reviewed. The first PANDA tests exhibited reproducibility, and indicated that the Simplified Boiling Water Reactor's containment is likely to be favorably responsive and highly robust to changes in the thermal transport patterns. (orig.).
15 to 75% of the gun barrel diameter. Similarly, model masses typically vary from 0.01 to 100 .... taining acceptable levels of gun barrel erosion. The ...
... and facilities; the physical processing of materials into products; and processes associated with ... area of bulk silicon prod! uction as wafer material has been omitted, in keeping with current ...
Since 1976, the Nuclear Engineering Laboratory of the Technical Research Centre of Finland and Lappeenranta University of Technology have cooperated in the field of nuclear reactor thermal-hydraulics. During these years, a series of experimental facilities (REWET-I, -II, -III, VEERA) simulating pressurized water reactors (PWRs) have been built. The newest facility, PACTEL (Parallel Channel Test Loop), is an experimental out-of-pile facility designed to simulate the major components and system behaviour of a commercial PWR during postulated small and medium size break loss-of-coolant accidents (LOCAs), natural circulation and operational transients. A PACTEL natural circulation experiment has been carried out as an OECD/NEA international standard problem ISP 33. (2 refs., 3 figs., 2 tabs.).
This program deals with solid waste disposal with topics/services covering: Reusable Building Materials and Large Household Items Exchange, Beneficial Use Determination, Biosolids, Certification, Compost Facil...
This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)
This document details monthly activities at the Savannah River Laboratory. Topics addressed are reactor operation; tritium facilities and production; separation operations; environmental concerns; and waste management. (FI)
The FFTF reactor is described. Procedures and equipment used to protect personnel from potential hazards of oxygen deficient environments are described.
This report summarizes the 1981 operating and test data obtained at the six ton per day Advanced Coal Liquefaction Research and Development Facility in Wilsonville, Alabama. Special emphasis is placed on data accumulated during the fourth quarter of 1981. The Wilsonville R and D Facility was in operation 71% of 1981 (70% of the fourth quarter) with scheduled shutdowns accounting for 23% of the downtime (28% during the fourth quarter). Kentucky 9 coal from the Fies mine was processed in all runs conducted during 1981 (Runs 222 through 235). The hydrotreater (HTR) unit was brought on stream successfully in May 1981. The three process units of the Wilsonville facility were operated in a non-integrated mode during the second half of 1981. Significant data was obtained and is summarized.
Sepsis has continuously been a leading cause of neonatal morbidity and mortality despite current advances in chemotherapy and patient intensive care facilities. Neonates are at high risk for...Full Text Available
Austria, Belgium, Czech Republic,. Denmark, Finland, France, Germany, .... Another study on ESA industry and partners: in relation with sustainability of ...
... revetment construction, water well drilling, mobile facility assets construction using ... five days, and establish site layout for the follow-on RH ... modules. ...
This Safety Analysis Report (SAR) is prepared in compliance with the requirements of DOE Order 5480.23, Nuclear Safety Analysis Reports, and has been written to the format and content guide of DOE-STD-3009-94 Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Safety Analysis Reports. The Hot Cell Facility is a Hazard Category 2 nonreactor nuclear facility, and is operated by Sandia National Laboratories for the Department of Energy. This SAR provides a description of the HCF and its operations, an assessment of the hazards and potential accidents which may occur in the facility. The potential consequences and likelihood of these accidents are analyzed and described. Using the process and criteria described in DOE-STD-3009-94, safety-related structures, systems and components are identified, and the important safety functions of each SSC are described. Additionally, information which describes the safety ...
where I was in El Paso, I could always look up and see the smokestacks of the old Asarco smelter looming. The facility affected the city in more ways than that constant visual...
where I was in El Paso, I could always look up and see the smokestacks of the old Asarco smelter looming. The facility affected the city in more ways than that constant visual...
strives to reduce our "environmental footprint" in the following areas: EPA Facilities Energy Conservation Requirements | Goals and Strategies | Results | Reports Green Power...
... perennials; the dominant species included, in order of their relative importance, Polygonum lapathifolium (C = 0 Heartsease), Arctium minus (C = 0 ...
Program Plans, Implementation, & Results Energy Management at Federal Facilities Energy Management at DOE Fleet Management Interagency Coordination Interagency Energy...
The purpose of this report is to provide management with performance data on key performance indicators selected from the FFTF Early Warning System performance indicators.
The nuclear complex in Tarapur, Maharashtra is a multi facility nuclear site comprising of power reactors and research facilities. Each facility has independent liquid effluent discharge line to Arabian Sea. Experimental studies were conducted to evaluate dilution factors in the aquatic environment using liquid effluent releases as tracer from one of the facilities. 3H and 137Cs radioisotopes present in the routine releases were used as simulated tracer nuclides. The dilution factors(D.F) observed for tritium were in the range of 20-20000 in a distance range of 10 m to 1500 m respectively and for 137Cs the D.F. were in the range of 50 to 900 over a distance range of 10-200 m. The paper describes the analytical methodology and sampling scenarios and the results of dilution factors obtained for Tarapur aquatic environment. (author)
With the increased costs of maintaining boilers and chillers entrepreneurs around the country have offered magnetic and similar devices to facilities as viable alternatives to their maintenance program. This report gives a brief history of some of the pre...
Exposure control at the operating Nuclear Power Station is a major concern. The challenging task of meeting the International standards in the field of radiation protection is the calibration of the radiation monitoring instruments and interpretation of personnel and area monitoring results. Correct interpretation is based on accurate calibration of radiation measuring instruments. The reliability and accuracy of the measurements are also partly based on the procedures applied in calibration. Inadequate calibration can cause large errors in dose estimation in complete dose rate range and energy range. Semiautomatic calibration facility established at TAPS 3 and 4 for radiation monitoring instruments. Objective of calibration facility is (a) Ensure instruments are working properly (b) calibration adjustment and (c) in case without calibration adjustment to reveal the error involved. The calibration facility and calibration ...
Two complementary computer programs have been developed for forecasting the demands and evaluating the costs of proposed radiographic facilities. The models are employed here in analyses of the sensitivity...Full Text Available
This layer represents the different food storage facilities available at backcountry campsites along the coast of Kenai Fjords National Park. Site locations ... ...
This report provides procedures for evaluating metal, consumable, and combustible cartridge cases. It identifies supporting tests, facilities, and equipment required. Subtests include weapon and ammunition preparation, initial inspection, ammunition chara...
from a military fuel storage facility released about 80,000 gallons of kerosine-based jet fuel. Immediate and extensive recovery measures managed to contain the spill, but...
from a military fuel storage facility released about 80,000 gallons of kerosine-based jet fuel. Immediate and extensive recovery measures managed to contain the spill, but...
The number of spent fuel storage facilities in the world continues to increase because of "Wait and See" policies and delay of a permanent disposal plan. The temporary spent fuel storage concept is changing to a pre-disposal storage concept. Strengthened safety concepts are required for expanded spent fuel storage facilities and sites. The Korea Hydro and Nuclear Power Company is planning to construct a reinforced concrete MACSTOR-400 facility at Wolsung. In concrete dry spent fuel storage structures, cracks can occur due to radiant heat and environmental chloride. The likelihood of cracking increases over time. Research on changes in shielding performance from one collinear crack in the surface of a concrete facility has been carried out. However there is no research about public radiolog...
Natural circulation experiments carried out in the REWET-III facility in 1985 have been used for RELAP5/MOD2 assessment. The REWET-III facility is a scaled-down model of VVER-440 type reactors. The facility consists of a pressure vessel in which the downcomer is simulated with an external pipe assembly, hot and cold legs with loop seals and a horizontal steam generator. The volume scaling factor compared to the reference reactor is 1:2333. The present paper summarizes the experiences gained in the RELAP5/MOD2 calculations of selected REWET-III single- and two-phase natural circulation experiments. The code's ability to represent the main phenomena of experiments in both cases was satisfactory.
Natural circulation experiments carried out in the REWET-III facility in 1985 have been used for RELAP5/MOD2 assessment. The REWET-III facility is a scaled-down model of VVER-440 type reactors. The facility consists of a pressure vessel in which the downcomer is simulated with an external pipe assembly, hot and cold legs with loop seals and a horizontal steam generator. The volume scaling factor compared to the reference reactor is 1:2333. The present paper summarizes the experiences gained in the RELAP5/MOD2 calculations of selected REWET-III single- and two-phase natural circulation experiments. The code`s ability to represent the main phenomena of experiments in both cases was satisfactory.
Natural circulation experiments carried out in the REWET-III facility in 1985 have been used for RELAP5/MOD2 assessment. The REWET-III facility is a scaled-down model of VVER-440 type reactors. The facility consists of a pressure vessel in which the downcomer is simulated with an external pipe assembly, hot and cold legs with loop seals and a horizontal steam generator. The volume scaling factor compared to the reference reactor is 1:2333. The present paper summarizes the experiences gained in the RELAP5/MOD2 calculations of selected REWET-III single- and two-phase natural circulation experiments. The code's ability to represent the main phenomena of experiments in both cases was satisfactory.
The Interim Examination and Maintenance (IEM) Cell is located within the Fast Flux Test Facility (FFTF) Reactor Containment Building. This cell is a complex vertical hot cell whose purpose is to process reactor experiments and to perform maintenance on reactor and refueling components. Because access to this very complex cell is limited, a mock-up called the IEM Training Facility (IEMTF) has been developed. The IEMTF provides the IEM cell with many valuable benefits. Four of these benefits are: (1) development of alternate processing methods; (2) hands-on evaluation of equipment problems; (3) a ready source of verified parts, and (4) training facilities for IEM Cell technicians.
The Advanced Neutron Source will be a new world-class facility for research using hot, thermal, cold, and ultra-cold neutrons. The heart of the facility will be a 330-MW (fission), heavy-water cooled and heavy-water moderated reactor. The reactor will be housed in a central reactor building, with supporting equipment located in an adjoining reactor support building. An array of cold neutron guides will fan out into a large guide hall, housing about 30 neutron research stations. Appropriate office, laboratory, and shop facilities will be included to provide a complete facility for users. The ANS is scheduled to begin operation at the Oak Ridge National Laboratory early in the next decade. This PDR document defines the plant-level requirements for the design, construction, and operation of ANS. It also defines and provides input to the individual System Design Description (SDD) documents. Together, this ...
Buildings Energy-Efficient Research Laboratories Energy Efficiency in Federal Facilities Energy Efficiency Standards Group Energy Efficient Windows Collaborative Energy &...
In summary, a scaling analysis of a water-cooled Reactor Cavity Cooling System (RCCS) system was performed based on generic information on the RCCS design of PBMR. The analysis demonstrates that the water-cooled RCCS can be simulated at the ANL NSTF facility at a prototypic scale in the lateral direction and about half scale in the vertical direction. Because, by necessity, the scaling is based on a number of approximations, and because no analytical information is available on the performance of a reference water-cooled RCCS, the scaling analysis presented here needs to be 'validated' by analysis of the steady state and transient performance of a reference water-cooled RCCS design. The analysis of the RCCS performance by CFD and system codes presents a number of challenges including: strong 3-D effects in the cavity and the RCCS tubes; simulation of turbulence in flows characterized by natural circulation, high Rayleigh numbers and low Reynolds numbers; validity ...
Trichloroethene (TCE), a common groundwater contaminant, can be degraded under certain conditions by microorganisms that occur naturally in the subsurface. TCE can be degraded under anaerobic conditions to less chlorinated compounds and ultimately into the non-chlorinated, non-hazardous end product, ethene, via anaerobic reductive dechlorination (ARD). ARD is widely recognized as a TCE degradation mechanism, and occurs in active groundwater remediation and can occur during monitored natural attenuation (MNA). MNA relies on natural processes, such as dispersion and degradation, to reduce contaminant concentrations to acceptable levels without active human intervention other than monitoring. TCE can also be biodegraded under aerobic conditions via cometabolism, in which microbial enzymes produced for other purposes fortuitously also react with TCE. In cometabolism, TCE is oxidized directly to non-hazardous products. Cometabolism as a TCE-degrading process under aerobic conditions is less ...
This document - IAEA Safeguards: Implementation Blueprint of Commercial Satellite Imagery - constitutes the second report from SSC Satellitbild giving a structured view and solid guidelines on how to proceed with a conceivable implementation of satellite imagery to support Safeguards activities of the Agency. This Phase 2 report presents a large number of concrete recommendations regarding suggested management issues, work organisation, imagery purchasing and team building. The study has also resulted in several lists of actions and preliminary project plans with GANT schedules concerning training, hardware and software, as well as for the initial pilot studies. In both the Phase 1 and Phase 2 studies it is confirmed that the proposed concept of a relatively small Imagery Unit using high-resolution data will be a sound and feasible undertaking. Such a unit capable of performing advanced image processing as a tool for various safeguard tasks will give the Agency an effective instrument ...
The behaviour of the packaging materials under radiation field has a great importance in radiation processing, because, in most cases, they are finally responsible for the preservation of the beneficent changes achieved in irradiated products. For example, in radiation sterilisation and food irradiation, the packages must preserve the sterilisation, respectively the sanitisation. They must preserve also the physical barrier feature. The radiation effects on plastics were extensively studied in the last decades for nuclear industry and more recently for radiation processing. The two major effects of nuclear radiation on polymeric materials are the degradation and cross-linking. The degradation consists in breaking of macromolecules after interaction with nuclear particles, amplified by the free radicals which persist long periods, especially in crystalline polymers. Oxygen could penetrate the sample and interact with free radicals so that the degradation process ...
National and international organizations have paid particular attention to the use of food irradiation as a method to reduce postharvest food losses, to ensure hygienic quality of foods-especially those of animal origin, and to overcome certain non-tariff barriers to trade for the following reasons: (1) The increasingly strict standards for quality and quarantine in food trade. (2) The increasingly restrictions and prohibitions of fumigants of food for health or environmental reasons. (3) The increasing awareness of foodborne diseases in both advanced and developing countries. (4) The high postharvest losses of foods in developing countries. (5) The increase liberalization of food trade after GATT Uruguay Round, and the need to maintain or increase export of food and agricultural commodities and to be competitive in the world market. Irradiated foods have been commercialized since 1973 when the first potato irradiator was established at the Shihoro Agricultural Cooperative, Hokkaido, ...
Installation of new Shortwave Spectrometer for permanent operation at SGP - In May 2006 the new ShortWave Spectrometer (SWS) was installed in the Optical Trailer at the Southern Great Plains Central Facility SGP on 27 April 2006. The SWS began full operation 28 April 2006 and has run continuously to the present. Over 25 GB of spectra has been collected, calibrated and archived. 3-D radiative transfer simulations - Retrieved fields of cloud optical thickness and effective radius to from the MODIS Airborne Simulator were used to reproduce 3D cloud fields that were used a input to 3D radiative transfer simulations and then compared with simultaneous Solar Spectral Flux Radiometer (SSFR) spectral irradiance measurements. The influence of both horizontal and vertical cloud structure, using accurate versus approximated optical properties in the radiative transfer model on the modeled irradiance was examined, as was the influence of using the full phase function versus ...
Three blocks of non-welded tuff, one nominally one cubic foot (trial block) in volume and the other two, nominally one cubic meter (1 m3) in volume, were excavated from the Busted Butte Test Facility on the Nevada Test Site in 1999 and transported to the Atomic Energy of Canada Limited Whiteshell Laboratories in Pinawa, Manitoba. The trial block and one of the 1-m3 blocks were used for radionuclide migration experiments under unsaturated conditions; the remaining 1-m3 block was used for similar migration experiments under saturated conditions. After a vertical flow of synthetic transport solution was set up under unsaturated conditions, a suite of conservative and chemically reactive radionuclide tracers was injected at volumetric flow rates of 20 mL/hr in the trial block, and 10 mL/hr in two locations on the upper surface of the 1-m3 block. These flow rates correspond to infiltration rates of about 120 cm/year and about 17 cm/year, respectively. The duration of ...
Full text: This presentation will review the progress achieved so far by the Irish national regulatory agency, the Radiological Protection Institut e of Ireland (R.P.I.I.) in the investigation of work activities where the presence of natural radiation sources (NORM) could lead to a significant increase in exposure to workers or members of the public which cannot be disregarded from the radiation protection point of view. Since the coming into force in Ma y 2000 of the Radiological Protection Act, 1991 (Ionising Radiation) Order, 2000 (S.I. No. 125 of 2000) which implements the Eu B.S.S. Directive 96/29/EURATOM, four major NORM industries currently active in Ireland have been investigated. According to the literature, they are all considered liable to involve work practices resulting in exposure to NORM. They include: the gas extraction and production industry, the peat- and coal-firing power generation industry and the bauxite/alumina refining industry. For the gas industry, monitoring ...
In the analysis of the consequences of a hypothetical meltdown accident in an LMFBR, it is important to estimate the final location of the molten fuel pool in the concrete and ground underlying the reactor vessel. The GROWS program and the AYER program have been developed to calculate the final location of the molten fuel pool as the culmination of the transient analysis of this unusual Stefan problem but these programs require extensive computational resources. The solution is provided to the concrete and ground temperatures surrounding the stationary fuel pool and the related heat flux from the pool to the ground surface outside the containment building. This solution can be used to estimate the final location of the fuel pool and to check the end results of the sophisticated programs.
We investigate the interplay between crossed channel final state interactions and the constraints from two-particle unitarity for the reactions J/{psi}{yields}V{pi}{pi} and VK anti K, where V is either {omega} or {phi}. Using a model where the parameters are largely constrained by other sources, we find that, although small, crossed channel final state interaction can influence the amplitudes considerably, in special areas of phase space. These results cast doubt on the inapplicability of unitarity constraints on production amplitudes as recently claimed in the literature. (orig.)
This is the final report covering work performed on research into methods of attaining clean ferrous castings. In this program methods were developed to minimize the formation of inclusions in steel castings by using a variety of techniques which decreased the tendency for inclusions to form during melting, casting and solidification. In a second project, a reaction chamber was built to remove inclusions from molten steel using electromagnetic force. Finally, a thorough investigation of the causes of sand penetration defects in iron castings was completed, and a program developed which predicts the probability of penetration formation and indicates methods for avoiding it.
... flex to LCCK components, to even a rotating hinge knee arthroplasty, and finally, to the segmental system. ... it also allows you to convert to the hinge immediately too, you know, especially in these bigger ...
... as the difference between date of birth and date of ... Final model selections were based on the ... approval by the Naval Submarine Medical Research ...
... Finally, the one dimensional, one phase Stefan problem is well known as a model for the melting of ice (see, eg, [5]). There are many approaches to ...
The fundamental points to be considered in a waste treatment system for a country like Japan, where the final disposal method has not been decided and the wastes have to be stored in the power plants, are volume reduction of the wastes, safe storage of the wastes in the plant, and flexibility regarding the final disposal. A system has been developed that consists of a thin film evaporator for the direct solidification of the liquid waste, a pelletizer for producing hard pellets from the powdered wastes, a pellet storage unit, and a solidification unit for the final disposal. A pilot plant with waste treatment capacity of 200 kg/h was built in 1976 and has proved the system feasibility. This paper reports on pilot plant tests of the thin film evaporator and other components, tests on pellet deterioration during long term storage, and integrity tests on the final disposal of the pellet bitumen package.
The fundamental points to be considered in a waste treatment system for a country like Japan, where the final disposal method has not been decided and the wastes have to be stored in the power plants, are volume reduction of the wastes, safe storage of the wastes in the plant, and flexibility regarding the final disposal. A system has been developed that consists of a thin film evaporator for the direct solidification of the liquid waste, a pelletizer for producing hard pellets from the powdered wastes, a pellet storage unit, and a solidification unit for the final disposal. A pilot plant with waste treatment capacity of 200 kg/h was built in 1976 and has proved the system feasibility. This paper reports on pilot plant tests of the thin film evaporator and other components, tests on pellet deterioration during long term storage, and integrity tests on the final disposal of the pellet bitumen package.
new technologies being evaluated by the ADTT. (d) Prepare the ... (g) Have final approval of the individual nominated for the position of Deputy. ADTT. (4) The ...
... The AAT Z mutation involves a single amino acid substitution (glutamine for lysine) at position 342, resulting in abnormal folding and polymerization of the ...
BackgroundFloating knee injuries are usually associated with other significant injuries. Do these injuries have implications on the management of the floating knee and the final...Full Text Available
Our global impact is finally receiving the scientific attention it deserves. The outcome will largely determine the future course of evolution. Human-modified ecosystems are shaped by our activities...Full Text Available
The following topics are discussed: program goal and objectives, program organization, and program status. Current program projects are described. (MHR)
A sustained increase in pulsatile release of gonadotrophin releasing hormone (GnRH) from the hypothalamus is an essential, final event that defines the initiation of mammalian puberty. This...Full Text Available
... A second hydrometeor sampler (MRI Model 1220 ... The cloud particle probe normally installed in ... to the northeast showed no significant movement. ...
was deemed adequate and a cooling system designed utilizing the Melcor CP2-15- 10B thermoelectric module. Wall temperature achieved with this system was - 36 ...
... Abstract : The United States Air Force (USAF) currently operates the Milstar satellite system to provide Military Satellite Communication Systems ...
Report) A Screening Assessment of the Potential Impacts of Climate Change on Combined Sewer Overflow (CSO) Mitigation in the Great Lakes and New England Regions (Final Report)...
tions, final noise-power spectral density measurements were made. These measurements of the noise-power spectral density were not the desired phase- noise ...
... Final accounting for extended to include ?mounts applicable ... is verified by the finance or disbursing ... the contractor must claim DLA, contractors must ...
The attendees this year included partic- ipants from space agencies, industry, and academia from Canada, the Czech Republic, France, Germany, Italy, Japan, ...
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has ...
The reverse approach to critical (RAC) experiments were performed in the ZPR-IX critical facility at Argonne National Laboratory. One of the major objectives of this project is to determine the adequacy of the low-level flux monitor (LLFM) detectors for initial loading of the Fast Flux Test Facility (FFTF). 5 references. (auth)
An integrated multiwell floating production, storage, and offloading (FPSO) facility was successfully installed at the Tazerka field offshore Tunisia in 1982. Because there is good reason to believe that the installation techniques developed for the Tazerka FPSO can be applied to even larger systems in deeper waters, this paper presents the design and step-by-step installation procedures developed at Tazerka.
The new collaborative exploitation of the JET Facilities requires suitable technical tools and infrastructure measures to enable the Remote Participation of scientists from all European Fusion labs. Such measures are being gradually introduced. They comprise of a toolkit for Remote Data Access, Remote Computer Access and for teleconferencing, and of infrastructure measures that address network connectivity, network security, shared documentation and technical support.
This paper presents results from the Advanced Coal Liquefaction R and D Facility at Wilsonville, Alabama. The primary sponsors are the US Department of Energy (DOE) and the Electric Power Research Institute (EPRI). Amoco Corporation became a sponsor in 1984 through an agreement with EPRI. The facility is operated by Catalytic, Inc., under the management of Southern Company Services, Inc.
A reliable inventory control system was developed at the Fast Flux Test Facility (FFTF) to keep track of the occupancy of 900 refueling facility locations, to compile historical data on the movement of each reactor assembly, and to simulate assembly moves. The simulate capability is valuable because it allows verification of documents before they are issued for use in the plant, and eliminates the possibility of planning illegal or impossible moves. The system is installed on a UNIVAC 1100 computer and is maintained using a data base management system by Sperry Univac called MAPPER.
The purpose of the work reported in this paper was to measure the radionuclide buildup in primary heat transport system cell No. 3 at the Fast Flux Test Facility (FFTF) and to compare the results with predicted values from a model based on experimental studies and experience at similar reactors. The information obtained is used for maintenance planning and to enhance ability to assess radionuclide buildup in the future at FFTF and in other reactors.
This Radioactive and Mixed Waste Management Plan for the Hazardous Waste Handling Facility at Lawrence Berkeley Laboratory is written to meet the requirements for an annual report of radioactive and mixed waste management activities outlined in DOE Order 5820.2A. Radioactive and mixed waste management activities during FY 1994 listed here include principal regulatory and environmental issues and the degree to which planned activities were accomplished.
Requirements and guidance are provided for a quality assurance program for the design of nuclear fuel reprocessing facilities involving structures, systems and components whose satisfactory performance is required to prevent accidents that could cause undue risk to the health and safety of the public, or to mitigate the consequences of such accidents if they were to occur. The standard is to be used in conjunction with ANSI N46.2.
Requirements and guidelines are provided for the control of activities to be exercised during procurement of items and services which affect the quality of nuclear facilities. These requirements and guidelines apply to procurement activities for items and services such as designing, purchasing, fabricating, handling, shipping, storing, cleaning, constructing, erecting, installing, inspecting, texting, maintaining and modifying.
The results of work of making the electronic textbook of special discipline ('General theory and construction of heat-and-power engineering facilities' are brought. The principles and requirements, presented towards literature of such type, are outlined. (author)
Power density measurements in the critical facility RA-8 are presented. These measurements were the first systematic use of the reactor. A measurement system was designed, built and proved for this goal. Power profiles are showed and the results are compared with calculated values. (author)
CETCO Oilfield Services, suppliers of environmental systems, have undertaken a project to treat contaminated water returns on a Floating, Production, Storage and Offloading (FPSO) facility in the North Sea. The solution sees fluids treated during oil well clean-up operations, reducing the potential for overboard oil discharges, and resulting production upsets.
Following a recent refurbishment of the NPL Thermal Neutron Facility, the spectrum of the epithermal and fast neutron component of the beam produced by the thermal column of this facility was measured over the energy range from thermal to 20 MeV using a Bonner sphere spectrometry system. The effect of the presence of epithermal and fast neutrons on the measured response of commonly-used thermal neutron dosemeters was calculated. (author)
Following a recent refurbishment of the NPL Thermal Neutron Facility, the spectrum of the epithermal and fast neutron component of the beam produced by the thermal column of this facility was measured over the energy range from thermal to 20 MeV using a Bonner sphere spectrometry system. The effect of the presence of epithermal and fast neutrons on the measured response of commonly-used thermal neutron dosemeters was calculated. (author)
At the RIKEN-RAL Muon Facility, ?- to ? sticking K? X-rays were observed for the first time taking advantage of the pulsed beam structure. The precision of the present measurements was insufficient to distinguish between theoretical models, however the observed K?/K? X-ray intensity ratio tends to be smaller than most of these theoretical predictions.
A krypton recovery pilot plant has been completed for the Power Reactor and Nuclear Fuel Development Corporation. This is the first industrial facility in the world to make practical use of development results for offgas treatment and storage from nuclear facilities. The cryogenic distillation process was adopted as a proven and reliable method to separate krypton and xenon, and to reduce gas effuents to a level so low that the decontamination factor amounts to more than 1000.
The possibility of having properly designed multinational fuel cycle agreements which would contribute to public acceptance of nuclear energy are explored. The advantages of existing international cooperation in the field of uranium enrichment and nuclear waste disposal and reprocessing are discussed. The possible forms of multinational co-operation under an international organisation, committed the non-proliferation and operating under international law and covering storage facilities, security of raw materials and the nuclear fuel cycle are summarised in model form. (U.K.).
During four years of operation at the Central Receiver Test Facility (CRTF) ceramics have performed well in cyclic solar flux densities of less than 30 W/cm/sup 2/. Above 100 W/cm/sup 2/, serious limitations exist. Important application considerations include: the geometry, cyclic and long time exposures, flux density gradients, thermal shock, weathering, and soiling.
This case study illustrates how an existing building can be transformed into a sustainable, green facility through teamwork. This multi-purpose building comprises office space, combustion testing facilities, and microwave communications center. The paper discusses internal systems design, indoor air quality, commissioning, economics, operations and maintenance, and monitoring.
This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams.
A facility for studying photon-neutron reactions under a braking #gamma#-beam with an energy of up to 26 MeV from a betratron includes Saratov-2, SM-4A, and IBM AT-386 microcomputers. Neutron detectors, pulsed braking radiation dosimeters, and the devices to control the betatron energy are described.
The Fast Flux Test Facility on the federal reservation at Hanford, Washington, has become a bright star in the universe of nuclear science and engineering technologies. The entire FFTF enterprise is now a success story, and this is particularly significant in these days when good news about nuclear power is scarce. The reactor, its testing capabilities and associated test facilities are described.
The technical rule intends to maintain the function of the safety facilities in case of explosion hazards resulting from materials capable of generating explosive atmospheres or forming explosive mixtures if such materials are brought or released into the nuclear facility or are generated on site. (orig.).
The technical rule intends to maintain the function of the safety facilities in case of explosion hazards resulting from materials capable of generating explosive atmospheres or forming explosive mixtures if such materials are brought or released into the nuclear facility or are generated on site. (orig.).
The Synthoil process for producing heavy desulfurized fuel oil from coal has been under development at Pittsburgh Energy Research Center since 1969. The status of development and technical feasibility of the process are reviewed. This is part of an engineering and economic evaluation based on the conceptual design of a 100,000-bbl/day commercial Synthoil facility. Experimental data are discussed with regard to their adequacy for the formulation of a basis for the process design of such a facility. Potential engineering and equipment problems are analyzed.
The purpose of this analysis is to develop a systematic program of projects that will result in energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan for the Stratford Army Engine Plant in Stratford, Connecticut. Reduced energy consumption is a stated goal for the Army Facility Energy Plan.
...to facilities using - Petrol and diesel industrial engines - Petrol and diesel light vehicles, commercial vehicles and trucks on the facility - Large stationary diesel and dual-fuel engines - Heavy-duty natural gas fired pipeline compressor engines and turbines First published in February 1999 Revised - August 2000 Version 2.3 - ...
Characterization of the electron beam's properties will be a major task after the upgrade of the Los Alamos Free-Electron Laser (FEL) Facility with a photoelectric injector (PEI) and increased acceleration capability to 40 MeV. Adjustments to the previous diagnostics package that address the lower beam emittance, higher energy, and wakefield source reduction issues will be discussed. 6 refs., 8 figs., 1 tab.
Geothermal heat pump systems necessitate a comprehensive approach to geology and building facilities in order to be energetically useful and efficient. Cooperation with geothermal experts should be sought at an early projecting stage in order to obtain reliable data. Geothermal data and the technical facilities of the building must be matched for the project to be both effective and efficient. (orig.)
Geological, geophysical, and engineering-geological research conducted at the 'Yeniseisky' site obtained data on climatic, geomorphologic, geological conditions, structure and properties of composing rock, and conditions of underground water recharge and discharge. These results provide sufficient information to make an estimate of the suitability of locating a radioactive waste (R W) underground isolation facility at the Nizhnekansky granitoid massif
A valuation methodology for commodity storage facilities is proposed. This model utilizes traded instruments to replicate the fundamental derivative components of commodity storage facilities. The methodology is robust to different commodities, physical characteristics, and markets for valuing these types of assets. Two examples using the U. S. natural gas markets are presented.
The Technical Safety Requirements (TSRs) for the Cold Vacuum Drying Facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological and toxicological consequences below risk evaluation guidelines are included.
A method of calculating the neutron source strength in irradiated Fast Flux Test Facility (FFTF), fuel has been developed and is presented in this paper. This method has been used to perform calculations in support of the reactivity monitoring of the FFTF reactor by the modified source multiplication method during refueling operations. 31 refs.
The Monte Carlo transport codes LAHET and MCNP were used to calculate energy fluence spectra at three neutron therapy facilities. The results compare very favourably with measured data. Kerma spectra and the ratio of ICRU muscle tissue kerma to A-150 kerma, along the carbon to oxygen kerma ratio, were determined. Absorbed dose rate calculations are in reasonable agreement with measured values. Use of these codes to study modifications to existing therapy beams is briefly discussed. (author).
This report describes a beneficiation facility designed to process 1620 tons per day of run-of-mine Alabama oil shale containing 12.7 gallons of kerogen per ton of ore (based on Fischer Assay). The beneficiation facility will produce briquettes of oil shale concentrate containing 34.1 gallons of kerogen per ton (based on Fischer Assay). The beneficiation facility will produce briquettes of oil shale concentrate containing 34.1 gallons of kerogen per ton (based on Fischer Assay) suitable for feed to a hydroretort oil extraction facility of nominally 20,000 barrels per day capacity. The beneficiation plant design prepared includes the operations of crushing, grinding, flotation, thickening, filtering, drying, briquetting, conveying and tailings empoundment. A complete oil shale beneficiation plant is described including all anticipated ancillary facilities. For purposes of determining ...
The mission of the Heavy Water portion of D Area (or 400 Area) at SRS is to purify the site inventory of heavy water for storage in the Reactor Areas for future DOE missions.
The purpose of this thesis is to study the behaviour of the simultaneous flow of oil and water in horizontal pipes. In this connection, two test facilities are used. Both facilities have horizontal test sections with inner pipe diameters equal to 2 inches. The largest facility, called the model oil facility, has reservoirs of 1 m{sub 3} of each medium enabling flow rates as high as 30 m{sub 3}/h, which corresponds to mixture velocities as high as 3.35 m/s. The flow rates of oil and water can be varied individually producing different flow patterns according to variations in mixture velocity and input water cut. Two main classes of flows are seen, stratified and dispersed. In this facility, the main focus has been on stratified flows. Pressure drops and local phase fractions are measured for a large number of flow conditions. Among the instruments used are differential pressure ...
This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH ...
The Waste Sampling and Characterization Facility (WSCF) complex consists of the main structure (WSCF) and four support structures located in the 600 Area of the Hanford site east of the 200 West area and south of the Hanford Meterology Station. WSCF is to be used for low level sample analysis, less than 2 mRem. The Laboratory features state-of-the-art analytical and low level radiological counting equipment for gaseous, soil, and liquid sample analysis. In particular, this facility is to be used to perform Resource Conservation and Recovery Act (RCRA) of 1976 and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 sample analysis in accordance with U.S. Environmental Protection Agency Protocols, room air and stack monitoring sample analysis, waste water treatment process support, and contractor laboratory quality assurance checks. The samples to be analyzed contain very low concentrations of radioisotopes. The ...
The third regular inspection of No.2 plant in Sendai Nuclear Power Station was carried out from December 27, 1988 to May 25, 1989. The parallel operation was resumed on April 28, 1989, 123 days after the parallel off. The facilities which were the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation and emergency electric power generation system. On the facilities which were the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out. As the results, significant in indication was observed in 8 bolts for fixing the flow-changing vanes of primary coolant pumps, and broken valve spindles were found, but other abnormality was not found. The works related to this regular ...
The second regular inspection of No.2 plant in Sendai Nuclear Power Station was carried out from October 5, 1987 to January 8, 1988. the parallel operation was resumed on December 8, 1987, 65 days after the parallel off. The facilities as the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation, and emergency power generation system. On these facilities as the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out, and abnormality was not found at all. The works related to this regular inspection were accomplished within the range of allowable dose based on the relevant laws. The main reconstruction works carried out during the period of this regular inspection were the ...
The second regular inspection of No.2 plant in Sendai Nuclear Power Station was carried out from October 5, 1987 to January 8, 1988. the parallel operation was resumed on December 8, 1987, 65 days after the parallel off. The facilities as the object of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation, and emergency power generation system. On these facilities as the object of inspection, the appearance, disassembling, leak, function, performance and other inspections were carried out, and abnormality was not found at all. The works related to this regular inspection were accomplished within the range of allowable dose based on the relevant laws. The main reconstruction works carried out during the period of this regular inspection were the ...
In the Institute for Atomic Energy, Rikkyo University, just after the TRIGA-2 research reactor of 100 kW has attained the criticality, the cylindrical box for neutron radiography (NR) irradiation was made in the attached pool, and the research on NR was started in 1961. Thereafter in 1985, the vertical irradiation pipe was installed in the reactor tank, and the experiment for collecting the basic data was begun. In 1986, based on the obtained data, the NR irradiation facility on full scale was installed in No. 2 tangential horizontal experimental hole. As the main NR irradiation facilities, the vertical neutron irradiation pipe, the use of which is stopped now, the NR facility using the horizontal experimental hole (RUR/N2), the irradiation facility and ancillary facilities such as beam shutter, beam catcher and hoist are described. As the main equipments for NR, the imaging ...
The Next Generation Nuclear Plant (NGNP), a demonstration reactor and hydrogen production facility proposed for construction at the INEEL, is expected to be a high-temperature gas-cooled reactor (HTGR). Computer codes used in design and safety analysis for the NGNP must be benchmarked against experimental data. The INEEL and ANL have examined information about several past and present experimental and prototypical facilities based on HTGR concepts to assess the potential of these facilities for use in this benchmarking effort. Both reactors and critical facilities applicable to pebble-bed and prismatic block-type cores have been considered. Four facilities--HTR-PROTEUS, HTR-10, ASTRA, and AVR--appear to have the greatest potential for use in benchmarking codes for pebble-bed reactors. Similarly, for the prismatic block-type reactor design, two experiments have been ranked as having ...
In the spring of 2002, the Department of Energy provided an initial 1-year grant to the Bureau of Economic Geology (BEG) at The University of Texas at Austin (UT). The grant covered the one-year operational expenses of a worldclass core and cuttings facility located in Houston, Texas, that BP America donated to the BEG. The DOE investment of $300,000, matched by a $75,000 UT contribution, provided critical first-year funds that were heavily leveraged by the BP gift of $7.0 million in facilities and cash. DOE also provided a one-month extension and grant of $30,000 for the month of May 2003. A 5-year plan to grow a permanent endowment in order to manage the facility in perpetuity is well under way and on schedule. The facility, named the Houston Research Center, represents an ideal model for a strong Federal, university, and private partnership to accomplish a national good. This report summarizes the ...
Under Federal law, the Department of Energy (DOE) is responsible for safe disposal of Greater-Than-Class C Low-Level Waste (GTCC LLW) generated by licenses of the Nuclear Regulatory commission (NRC) or Agreement States. Such waste must be disposed of in a facility licensed by the NRC. It is unlikely that licensed disposal of GTCC LLW will be available prior to the year 2010. Pending availability of disposal capacity, DOE is assessing the need for collective, long-term storage of GTCC LLW. Potential risks to public health and safety caused by long-term storage of GTCC LLW at the place of generation will be evaluated to determine if alternative facilities are warranted. If warranted, several options will be investigated to determine the preferred alternative for long-term storage. These options include modification of an existing DOE facility, development of a new DOE facility, or development of a ...
Described herein are the latest trends in rolling mill facilities toward the 21st. century and new techniques developed by Hitachi Ltd. These cover hot rolling facilities, such as two-stage twin, high crown control-roll cross mill, roll shaping machine and continuous hot rolling systems; cold rolling facilities, such as pickling line-tandem cold mill and other continuous systems; and fine steel rolling facilities, such as roll mill for very small diameter pipes and others to improve productivity and product quality. The other new techniques include systems to pursue reliability and maintainability, in which electric appliances, instruments and computers are integrated, or equipped with built-in large-capacity inverters and drivers. For hot rolling, the above techniques lead to development of a new system named Hi-HOT, which produces high-quality hot coils at a sufficient speed, while keeping rolled ...
This document describes the geology and hydrogeology at the former Advanced Coal Liquefaction Research and Development (ACLR&D) facility in Wilsonville, Alabama. The work was conducted by personnel from the Oak Ridge National Laboratory Grand Junction office (ORNL/GJ) for the U.S. Department of Energy (DOE) Pittsburgh Energy Technology Center (PETC). Characterization information was requested by PETC to provide baseline environmental information for use in evaluating needs and in subsequent decision-making for further actions associated with the closeout of facility operations. The hydrogeologic conceptual model presented in this report provides significant insight regarding the potential for contaminant migration from the ACLR&D facility and may be useful during other characterization work in the region. The ACLR&D facility is no longer operational and has been dismantled. The site was ...
The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, and/or disposal ...
Free electron laser (FEL) facilities as the FELI FEL Facility are proposed, for which a 150-MeV linac type injector for a Saga synchrotron light source (SLS) is employed in FEL mode. The linac has two operating modes; short macropulse mode a 1 #mu#s at 150 MeV for injection to a 1 - 1.3-GeV third generation type storage ring and long macropulse mode of 12 #mu#s at 100 MeV for four FEL Facilities. The macropulse beam consists of a train of several ps, 0.6 nC microbunches (peak current 100 A) repeating at 89.25 MHz. We are aiming to supply high power level photon beams covering an attractive wavelength range from 0.05 nm (25 keV) to 200 #mu#m (0.006 eV) for scientific researches, bio-medical and industrial applications, using the Saga third generation type SLS with a superconducting wiggler and the proposed four FEL Facilities. (author)
Scenarios are developed for spent fuel that is taken out of the nuclear reactor and stored for 20 years before reprocessing, and three storage techniques which use a water pool, dry cask or vault are compared with respect to their costs. The storage price (storage cost per kilogram of spent fuel), which is employed as the economic index, is calculated on the assumption that all the charge is paid when the spent fuel is brought in the storage facilities. Four scenarios are assumed for spent PWR and BWR fuels to be stored in at-reactor (AT) or away-from-reactor (AFR) facilities. The capital costs cover the buildings of the storage facilities, equipment, decommissioning, casks for transportation and storage (for cask storage) and casks for transportation (for water pool or vault storage). Costs for operation and maintenance of the facilities are also considered in evaluating these methods. Evaluation ...
Scenarios are developed for spent fuel that is taken out of the nuclear reactor and stored for 20 years before reprocessing, and three storage techniques which use a water pool, dry cask or vault are compared with respect to their costs. The storage price (storage cost per kilogram of spent fuel), which is employed as the economic index, is calculated on the assumption that all the charge is paid when the spent fuel is brought in the storage facilities. Four scenarios are assumed for spent PWR and BWR fuels to be stored in at-reactor (AT) or away-from-reactor (AFR) facilities. The capital costs cover the buildings of the storage facilities, equipment, decommissioning, casks for transportation and storage (for cask storage) and casks for transportation (for water pool or vault storage). Costs for operation and maintenance of the facilities are also considered in evaluating these methods. Evaluation ...
Claims of property value loss are commonly raised by homeowners when noxious facilities are sited or when new information about the hazards of existing facilities is made public. While the capitalization of externalities into land values is consistent with economic theory, empirical measurement of impacts has not generated consistent results. This is true both for hedonic measurements as well as other types of econometric analyses. While it is well established that job and site risks have similar impacts on regional labor markets, there are no studies relating the presence of a broad range of noxious facilities to local wage premiums. In contrast, this study employs an interregional framework in a hedonic analysis of both wage and property markets and considers eight different facility classifications. This paper discusses the development of the hedonic model employed in this study. It develops more ...
Claims of property value loss are commonly raised by homeowners when noxious facilities are sited or when new information about the hazards of existing facilities is made public. While the capitalization of externalities into land values is consistent with economic theory, empirical measurement of impacts has not generated consistent results. This is true both for hedonic measurements as well as other types of econometric analyses. While it is well established that job and site risks have similar impacts on regional labor markets, there are no studies relating the presence of a broad range of noxious facilities to local wage premiums. In contrast, this study employs an interregional framework in a hedonic analysis of both wage and property markets and considers eight different facility classifications. This paper discusses the development of the hedonic model employed in this study. It develops more ...
Rocket-Based Combined-Cycle (RBCC) engines intended for missiles and/or space launch applications incorporate features of rocket propulsion systems operating in concert with airbreathing engine cycles. Performance evaluation of these types of engines, which are intended to operate from static sea level take-off to supersonic cruise or accerlerate to orbit, requires ground test capabilities which integrate rocket component testing with airbreathing engine testing. A combined cycle engine test facility has been constructed in the General Applied Science Laboratories, Inc. (GASL) Aeropropulsion Test Laboratory to meet this requirement. The facility was designed to support the development of an innovative combined cycle engine concept which features a rocket based ramjet combustor. The test requirements included the ability to conduct tests in which the propulsive force was generated by rocket only, the ramjet only and simultaneous rocket and ...
The German-Russian project that is part of the G8 initiative on Global Partnership Against the Spread of Weapons and Materials of Mass Destruction focuses on the speedy construction of a land-based interim storage facility for nuclear submarine reactor compartments at Sayda Bay near Murmansk. This project includes the required infrastructure facilities for long-term storage of about 150 reactor compartments for a period of about 70 years. The interim storage facility is a precondition for effective activities of decommissioning and dismantlement of almost all nuclear-powered submarines of the Russian Northern Fleet. The project also includes the establishment of a computer-assisted waste monitoring system. In addition, the project involves clearing Sayda Bay of other shipwrecks of the Russian navy. On the German side the project is carried out by the Energiewerke Nord GmbH (EWN) on behalf of the Federal Ministry of ...
In-situ compaction method is an alternative technology for the construction of a buffer at HLW final disposal. Understanding of the compaction characteristics of the proposed material is important for this method of construction. In this report, paying attention to the relation between compaction energy and the achieved maximum dry density, dynamic compaction characteristic of bentonite and silica sand mixture material is examined. (author)
The authors present here several recent measurements involving associate production of photons and jets at the Tevatron. In particular, inclusive photon + met from D0, and photon + b-jets and photon + b-jet + leptons + MET from CDF are described in some detail. These measurements offer a good test of QCD predictions in rather complex final states.
A final report is presented on the design, environmental characteristics, performance and maintainability, and economic analysis of a commercial 663 MWe coal-fired combined cycle power plant using pressurized fluidized bed combustion, and advanced technology in the hot gas cleanup system and gas turbines. Experimental data on the performance of each of the major components are included. (LCL)
We study heavy physics effects on the Higgs production in #gamma##gamma# fusion using the effective Lagrangian approach. We find that the effects coming from new physics may enhance the standard model predictions for the number of events expected in the final states b-barb, WW, and ZZ up to one order of magnitude, whereas the corresponding number of events for the final state t-bart may be enhanced up to two orders of magnitude.
The research of the CELLO collaboration is reviewed. After a description of the CELLO detector tests of QCD and hadronic final states by determination of the strong coupling constant and studies of inclusive production of electrons and muons in multihadronic events in e"+e"- annihilation are described. Then studies of deep inelastic e#gamma# scattering with lepton pair production and the study of the structure function of the photon are briefly described. Finally studies on QED processes are described together with tau decays. (HSI).
This report describes the work carried out to analyze and design a circuit for use in 1200 kV gas insulated substations. The first part of the project was devoted to a thorough analysis of the requirements for the circuit breaker from the standpoint of the electrical system in which it would operate. A conceptual design was selected and all of the components of the circuit breaker were designed, modeled and verified. Finally a plan was prepared for the construction of a complete circuit breaker.
TransCanada Pipelines Limited submitted an application to the National Energy Board for new facilities to increase natural gas deliveries to its domestic and export markets. The proposed facilities consist of 1,590 km of pipeline, 21 new compressor units and two new compressor stations. The total cost of the facilities was estimated at $2,408 million. The Board considered at the hearing 15 applications made pursuant to Part IV of the National Energy Board Act for gas exports at existing delivery points at Emerson and Niagra Falls as well as at proposed new delivery points at Chippawa and Iroquois, Ontario. Twelve of these applications were filed in support of TransCanada's facilities application. Five applications were also filed pursuant to section 71 of the National Energy Board Act for orders requiring TransCanada to receive, transport and deliver natural gas offered by the applicants and to ...
TransCanada Pipelines Limited submitted an application to the National Energy Board for new facilities to increase natural gas deliveries to its domestic and export markets. The proposed facilities consist of 1,590 km of pipeline, 21 new compressor units and two new compressor stations. The total cost of the facilities was estimated at $2,408 million. The Board considered at the hearing 15 applications made pursuant to Part IV of the National Energy Board Act for gas exports at existing delivery points at Emerson and Niagra Falls as well as at proposed new delivery points at Chippawa and Iroquois, Ontario. Twelve of these applications were filed in support of TransCanada's facilities application. Five applications were also filed pursuant to section 71 of the National Energy Board Act for orders requiring TransCanada to receive, transport and deliver natural gas offered by the applicants and to ...
This inspection plan is written to meet the requirements of WAC 173-303 for operations of a TSD facility. Owners/operators of TSD facilities are required to inspection their facility and active waste management units to prevent and/or detect malfunctions, discharges and other conditions potentially hazardous to human health and the environment. A written plan detailing these inspection efforts must be maintained at the facility in accordance with Washington Administrative Code (WAC), Chapter 173-303, ``Dangerous Waste Regulations`` (WAC 173-303), a written inspection plan is required for the operation of a treatment, storage and disposal (TSD) facility and individual TSD units. B Plant is a permitted TSD facility currently operating under interim status with an approved Part A Permit. Various operational systems and locations within or under the control of B ...
The neutron capture cross-section of {sup 234}U has been measured for energies from thermal up to the keV region in the neutron time-of-flight facility n-TOF, based on a spallation source located at CERN. A 4{pi} BaF{sub 2} array composed of 40 crystals, placed at a distance of 184.9 m from the neutron source, was employed as a total absorption calorimeter (TAC) for detection of the prompt {gamma}-ray cascade from capture events in the sample. This text describes the experimental setup, all necessary steps followed during the data analysis procedure. Results are presented in the form of R-matrix resonance parameters from fits with the SAMMY code and compared to the evaluated data of Endf in the relevant energy region, indicating the good performance of the n-TOF facility and the TAC. (authors)
A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of ''passive'' Advanced Light Water Reactors. The effects of aerosols that may result from hypothetical severe accidents are also considered. The construction of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA, has been completed. First steady-state tests have been performed on PANDA. The other facilities are now in their commissioning phases. Scaling studies have guided the design of the experimental facilities. Several small-scale experimental and studies have already produced valuable results which can be used to direct the experimental work, as well as the design of the passive ALWRs. (author). 23 refs, 6 figs.
The PANDA test facility at PSI in Switzerland is used to study the long-term Simplified Boiling Water Reactor (SBWRT) Passive Containment Cooling System (PCCS) performance. The PANDA tests demonstrate performance on a larger scale than previous tests and examine the effects of any non-uniform spatial distributions of steam and noncondensables in the system. The PANDA facility is in 1:1 vertical scale, and 1:25 'system' scale (volume, power, etc.). Steady-state PCCS condenser performance tests and extensive facility characterization tests have already been conducted. A series of transient system behavior tests have been completed by end of 1995. Results from the first three transient tests (M3 series) are reviewed. The first PANDA tests exhibited reproducibility, and indicated that the SBWR containment is likely to be favorably responsive and highly robust to changes in the thermal transport patterns. (author) 6 figs., 11 ...
The ALPHA project is centered around the experimental and analytical investigation of the long-term decay heat removal from the containments of the next generation of open-quotes passiveclose quotes ALWRs. The project includes integral system tests in the large-scale (1:25 in volume) PANDA facility as well as several other series of tests and supporting analytical work. The first series of experiments to be conducted in PANDA have become a required experimental element in the certification process for the General Electric Simplified Boiling Water Reactor (SBWR). The PANDA general experimental philosophy, facility design, scaling, and instrumentation are described. Steady-state PCCS condenser performance tests and extensive facility characterization tests were already conducted. The transient system behavior tests are underway; preliminary results from the first transient test M3 are reviewed.
The contribution attempts a definition of the concepts of ``technical facilities`` and ``facility management``. [Deutsch] Um mit der Ueberschrift zu beginnen: Was ist Gebaeudetechnik? Die Antwort ist nicht ganz einfach. An der TU Berlin gibt es einen Ingenieur-Studiengang mit dieser Bezeichnung. Es hat etwas mit dem Gebaeude, aber nicht viel mit Architektur zu tun, wie manchmal faelschlich angenommen wird. Um solche Missverstaendnisse gar nicht erst aufkommen zu lassen, hat sich die Gruppe des Vereins Deutscher Ingenieure, die sich mit der Gebaeudetechnik beschaeftigt, als `VDI-Gesellschaft Technische Gebaeudeausruestung` bezeichnet. (orig.)
This paper describes the modeling of horizontal steam generator with the TRACE code and calculation results of a loss-of-feedwater (LOF-10) experiment at the PACTEL facility. Parallel Channel Test Loop (PACTEL) is an integral test facility for a VVER-440 type nuclear reactor. The main objectives were to prepare a simulation model for its horizontal steam generator with the TRACE thermal hydraulic code and assess different modeling options of the code. PACTEL experiment LOF-10 was chosen for this assessment. The calculation results showed that TRACE is capable in simulating horizontal steam generator behavior both in steady state and during loss-of-feedwater transient. The phenomenon of heat transfer from primary to secondary side, steam superheating and flow reversal in the lowest heat exc...
This report describes the status of nuclear safety and radiation protection in the facilities of the AREVA group and gives information on radiation protection in the service operations, as observed through the inspection programs and analyses carried out by the General Inspectorate in 2007. Having been submitted to the group's Supervisory Board, this report is sent to the bodies representing the personnel. Content: 1 - A look back at 2007 by the AREVA General Inspector: Visible progress in 2007, Implementation of the Nuclear Safety Charter, Notable events; 2 - Status of nuclear safety and radiation protection in the nuclear facilities and service operations: Personnel radiation protection, Event tracking, Service operations, Criticality control, Radioactive waste and effluent management; 3 - Performance improvement actions; 4 - Description of the General Inspectorate; 5 - Glossary.
Facility management has long been regarded as a cost reduction measure, but it is also a means of raising the financial worth of a building so that landlords can get higher rents or sell the building at a better price. [German] Lange Zeit wurde Facility Management als eine Massnahme zur Kostensenkung angesehen. Heutzutage zeigt sich immer mehr, dass das Facility Management sehr viel umfassender zu verstehen ist: Der Wert eines Gebaeudes bemisst sich nicht allein an einer niedrigen Kostenquote, sondern er soll umfassend Investoren wie Mietern den hoechst moeglichen Nutzen bringen. Nicht allein der kostenguenstige Betrieb ist entscheidend, sondern der Wert des Gebaeudes muss insgesamt gesteigert werden. (orig.)
In order to assess various core parameters a reference equilibrium core with Low Enriched Uranium (LEU) fuel for Pakistan Research Reactor (PARR-1) was assembled. Due to increased volume of reference core, the average neutron flux reduced as compared to the first higher power operation. To get a higher neutron flux an irradiation facility was created in centre of the reference equilibrium core where the advantage of the neutron flux peaking was taken. Various low power experiments were performed in order to evaluate control rods worth and neutron flux mapping inside the core. The neutron flux inside the central irradiation facility almost doubled. With this arrangement reactor operation time was cut down from 72 hours to 48 hours for the production of the required specific radioactivity. (author)
The Savannah River Site disposes of low-level radioactive waste within on-site engineered disposal facilities. The Savannah River Site must demonstrate that these disposals meet the requirements of DOE Order 435 . 1 through a process known as performance assessment (PA). The objective of this document is to provide the radionuclide -specific data needed for the PA calculations . This work is part of an on-going program to periodically review and update existing PA work as new data becomes available. Revision of the E -Area Low-Level Waste Facility PA is currently underway. The number of radionuclides selected to undergo detailed analysis in the PA is determined by a screening process. The basis of this process is described. Radionuclide-specific data for half-lives, decay modes, daughters, dose conversion factors and groundwater concentration limits are presented with source references and methodologies.
The historical back ground of free electron laser (FEL) and the present status of development and utilization research of FEL facilities in the world are explained. Eight facilities such as Stanford Univ., UCSB, Duke Univ., Vanderbilt Univ., LANL AFEL (USA), FOM FELIX (Netherlands), N-lands LURE CLIO (France) and FELI (Japan) can be used. The principle of FEL generation process is that free electrons move in a zigzag direction to generate radio waves which interfere with each other to become monochromatic light and then free electron laser. The benefits of FEL, quality of electron beam, limit of wave length of FEL, problems and development of utilization technologies of FEL are explained. (S.Y.)
Neutron energy spectra were measured for two OSURR experimental facilities. The method of multiple foil activation was used with the SAND-II neutron spectrum unfolding code to obtain spectral data for the Central Irradiation Facility and Rabbit tube. Limited data was obtained for the thermal column using only gold foils. Calculations were made of the neutron environment in various locations using the MORSE code. A shift towards higher neutron energies was observed comparing results for LEU and HEU cores. A slight loss in total thermal neutron flux was measured for all positions. Calculational results show reasonable agreement with measured data.
A thermal neutron imaging facility for real-time neutron radiography and computed tomography has recently been developed at the University of Texas TRIGA reactor. Extensive Monte Carlo design calculations were used to determine optimal design parameters of the neutron collimator system to avoid costly trial and error. Thermal neutron flux determined by gold foil activation is 5 {times} 10{sup 6} n/cm{sup 2}{center_dot}s at the primary imaging location with beam size of 22.5 cm in diameter. The collimation ratio can be varied from 125 to 235. The neutron-to-gamma ratio is 7.8 {times} 10{sup 6} n/cm{sup 2}{center_dot}mR. The facility has been tested for radiography and tomography applications and is now fully operational.
One important factor frustrating optimal management of Department of Energy (DOE)-complex wastes is the inability to use licensed and permitted facilities systematically. Achieving the goal of optimal use of DOE`s waste management facilities is politically problematic for two reasons. First, no locale wants to bear a disproportionate burden from DOE wastes. Second, the burden imposed by additional wastes transported from one site to another is difficult to characterize. To develop a viable framework for equitably distributing these burdens while achieving efficient use of all DOE waste management facilities, several implementation and equity issues must be addressed and resolved. This paper discusses stakeholder and equity issues and proposes a framework for joint research and action that could facilitate equity negotiations among stakeholder and move toward a more optimal use of DOE`s waste management capabilities.
A thermal neutron imaging facility for real-time neutron radiography and computed tomography has been developed at the University of Texas reactor. The facility produced a good-quality radiographs and two-dimensional tomograms. Further developments have been recently accomplished. Further developments have been recently accomplished. A computer software has been developed to automate and expedite the data acquisition and reconstruction processes. Volume tomographic visualization using Interactive Data Language (IDL) software has been demonstrated and will be further developed. Volume tomography provides the additional flexibility of producing slices of the object using software and thus avoids redoing the measurements.
The Buried Waste Integrated Demonstration (BWID) is a program of the Department of Energy (DOE) Office of Technology Development whose mission is to evaluate different new and existing technologies and determine how well they address DOE community waste remediation problems. Twenty-three Technical Task Plans (TTPs) have been identified to support this mission during FY-92; 10 of these have identified some support requirements when demonstrations take place. Section 1 of this report describes the tasks supported by BWID, determines if a technical demonstration is proposed, and if so, identifies the support requirements requested by the TTP Principal Investigators. Section 2 of this report is an evaluation identifying facility characteristics of existing Idaho National Engineering Laboratory (INEL) facilities that may be considered for use in BWID technology demonstration activities.
Fuel Management at the Fast Flux Test Facility (FFTF) involves more than just the usual ex-core and in-core management of standard fuel and non-fuel components between storage locations and within the core since it is primarily an irradiation test facility. This mission involves testing an ever increasing variety of fueled and non-fueled experiments, each having unique requirements on the reactor core as well as having its own individual impact on the reload design. This paper describes the fuel management process used by the Westinghouse Hanford Company Core Engineering group that has led to the successful reload design of nine operating cycles and the irradiation of over 120 tests.
In compliance with Article 20 of the sustainable radioactive materials and waste management act dated 28 June 2006, the CEA and AREVA are required every three years to revise the cost of decommissioning their facilities and to provide the necessary assets by constituting a dedicated fund. For the 2007 revision the CEA used ETE-EVAL V5. Similarly, AREVA reevaluated the cost of decontaminating and dismantling its facilities at La Hague, as the previous estimate in 2004 did not take into account the complete cleanup of all the structural work. ETE-EVAL V5 is a computer application designed to estimate the cost of decontamination and dismantling of basic nuclear installations (INB). It has been qualified by Bureau Veritas and audited. ETE-EVAL V5 has become the official software for cost assessment of CEA civilian and AREVA decommissioning projects. It has been used by the DPAD (Decontamination and Dismantling Projects Department) cost assessment ...
Evaluations were done to determine conditions that could permit nuclear criticality with fissile uranium in low-level waste (LLW) facilities and to estimate potential radiation exposures to personnel if there were such an accident. Simultaneous hydrogeochemical and nuclear criticality studies were done (1) to identity realistic scenarios for uranium migration and concentration increase at LLW disposal facilities, (2) to model groundwater transport of uranium and subsequent concentration via sorption or precipitation, (3) to evaluate the potential for nuclear criticality resulting from potential increases in uranium concentration over disposal limits, and (4) to estimate potential radiation exposures to personnel resulting from criticality consequences. This paper presents the details of the radiation exposure calculations relying on the conditions as determined from the preceding studies detailed in a cited reference.
The diagnostic designs for the Laser Megajoule (LMJ) will require components to operate in environments far more severe than those encountered in present facilities. This harsh environment will be induced by fluxes of neutrons, gamma rays, energetic ions, electromagnetic radiations, and, in some cases, debris and shrapnel, at levels several orders of magnitude higher than those experienced today on existing facilities. The lessons learned about the vulnerabilities of present diagnostic parts fielded mainly on OMEGA for many years, have been very useful guide for the design of future LMJ diagnostics. The present and future LMJ diagnostic designs including this vulnerability approach and their main mitigation techniques will be presented together with the main characteristics of the LMJ facility that provide for diagnostic protection.
A program under the sponsorship of the United States Nuclear Regulatory Commission was intiated at the Oak Ridge National Laboratory (ORNL) in late 1977. The program, Advanced Instrumentation for Reflood Studies (AIRS), is charged with developing instrumentation for measurement of in-vessel fluid phenomena in pressurized water reactor reflood facilities. The goal of the ORNL program is to develop techniques and systems for measuring fluid flow in-core, deentrainment in the upper plenum and liquid fallback from the upper plenum into the core. A large portion of the development at ORNL is devoted to the impedance probes for measurement of two-phase flow velocities and void fractions. Film probe development at ORNL is limited to adapting the present techniques to the environment of a reflood facility. As the development progresses on all the measurement techniques, ORNL will fabricate and supply instrument systems to the reflood ...
Objectives of the program are to understand the mechanisms of coal liquefaction, to determine the role of catalysts in the direct conversion of coal to liquids, to determine the mechanism of catalyst deactivation and to explore slurry phase catalyst systems. Specific projects include: short-contact time coal liquefaction, mineral matter effects and catalyst studies. During this period, work was performed on: (1) the stability, at reaction temperature, of a recycle solvent obtained from the Lummus Two Stage Liquefaction facility, (2) reactions of preasphaltenes and asphaltenes prepared under various reaction severities, (3) the evaluation of the catalyst level detector installed at the H-Coal facility, (4) the characterization of oil soluble metal compounds with respect to hydrogenation activity, and (5) characterization, deactivation and regeneration of catalysts obtained from both the H-Coal and Lummus facilities.
Probabilistic risk assessment is a technique used to systematically analyze complex technical systems, such as nuclear waste management facilities, in order to identify and measure their public health, environmental, and economic risks. Probabilistic techniques have been utilized at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, to evaluate the probability of a catastrophic waste hoist accident. A probability model was developed to represent the hoisting system, and fault trees were constructed to identify potential sequences of events that could result in a hoist accident. Quantification of the fault trees using statistics compiled by the Mine Safety and Health Administration (MSHA) indicated that the annual probability of a catastrophic hoist accident at WIPP is less than one in 60 million. This result allowed classification of a catastrophic hoist accident as ''not credible'' at WIPP per DOE definition. Potential uses of probabilistic ...
The effects of response effort on safe behaviors (i.e., glove wearing, hand sanitizing, and electrical outlet replacement) exhibited by therapists at an autism treatment center were examined. Participants...Full Text Available
The world fusion program has advanced to the stage where it is appropriate to construct a number of devices for the purpose of burning DT fuel. In these next-generation experiments, the expected flux and fluence of 14 MeV neutrons and associated gamma rays will pose a significant challenge to the operation and diagnostics of the fusion device. Radiation effects include structural damage to materials such as vacuum windows and seals, modifications to electrical properties such as electrical conductivity and dielectric strength and impaired optical properties such as reduced transparency and luminescence of windows and fiber optics during irradiation. In preparation for construction and operation of these new facilities, the fusion diagnostics community needs to work with materials scientists to develop a better understanding of radiation effects, and to undertake a testing program aimed at developing workable solutions for this multi-faceted problem. A unique ...
Abstracts of research projects are presented in the following areas: measurements and special facilities; cellular and subcellular studies; physiology; behavior; environmental effects; modeling, scaling and dosimetry; and high voltage direct current. (ACR)
Several studies have raised the possibility that exposure to electrical and/or magnetic fields may be injurious to health in particular by the promotion or initiation of cancer. To investigate whether...Full Text Available
BackgroundChina has had no effective and systematic information system to provide guidance for strengthening PHC (Primary Health Care) or account to citizens on progress. We report...Full Text Available
Enzootic Glassers's disease was investigated to study the epidemiology of the disease strains on a farm where it presented a problem. Restriction endonuclease fingerprinting (REF) analysis technique...Full Text Available