The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, ...
This Streamlined Approach for Environmental Restoration (SAFER) plan addresses closure for Corrective Action Unit (CAU) 118, Area 27 Super Kukla Facility, identified in the ''Federal Facility Agreement and Consent Order''. Corrective Action Unit 118 consists of one Corrective Action Site (CAS), 27-41-01, located in Area 27 of the Nevada Test Site. Corrective Action Site 27-41-01 consists of the following four structures: (1) Building 5400A, Reactor High Bay; (2) Building 5400, Reactor Building and access tunnel; (3) Building 5410, Mechanical Building; and (4) Wooden Shed, a.k.a. ''Brock House''. This plan provides the methodology for field activities needed to gather the necessary information for closing the CAS. There is sufficient information and process knowledge from historical documentation and site ...
This Closure Report (CR) documents closure activities for Corrective Action Unit (CAU) 543, Liquid Disposal Units, according to the Federal Facility Agreement and Consent Order (FFACO, 1996) and the Corrective Action Plan (CAP) for CAU 543 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2007). CAU 543 is located at the Nevada Test Site (NTS), Nevada (Figure 1), and consists of the following seven Corrective Action Sites (CASs): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; CAS 15-23-03, Contaminated Sump, Piping; and CAS 06-07-01 is located at the Decontamination Facility in Area 6, adjacent to Yucca Lake. The remaining CASs are located at the former U.S. Environmental ...
In 1993, the US Department of Energy (DOE) decided to shut down the Fast Flux Test Facility (FFTF) due to lack of national missions that justified the annual operating budget of approximately $88M/year. The initial vision was to ''deactive'' the facility to an industrially and radiologically safe condition to allow long-term, minimal surveillance storage until approximately 2045. This approach would minimize near term cash flow and allow the radioactive decay of activated components. The final decontamination and decommissioning (D and D) would then be performed using then-current methodology in a safe and efficient manner. the philosophy has now changed to close coupling the initial deactivation with final D and D. This paper presents the status of the facility and focuses on the future challenge of sodium removal.
This study evaluates the degree to which surface impoundments at licensed facilities comply with significant changes in NRC requirements initiated by enactment of EPA's final environmental standards for uranium recovery facilities (40 CFR Part 192). Impoundment liner requirements, ground-water protection standards, ground-water monitoring and corrective action programs, and site closure standards are the most significant regulatory modifications. The compliance status of 30 conventional mills and 31 in-situ mines is determined from a review of Nuclear Regulatory Commission and agreement state docket files through November, 1983. Results of this review show that a majority of conventional uranium mill tailings management systems are deficient with respect to liner requirements for new impoundments or proposed expansions to existing impoundments, as well as with respect to some aspects of ground-water monitoring and ...
This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings.
... System (CSRS) and the Federal Employees Retirement System (FERS). ... retirement, thrift savings plan, annual and sick leave, severance pay and ...
This paper details the development of a decontamination approach for the West Valley Demonstration Project (WVDP), Decontamination Project Plan (Plan). The WVDP is operated by West Valley Nuclear Services Company (WVNSCO), a subsidiary of Westinghouse Government and Environmental Services, and its parent companies Washington Group International and British Nuclear Fuels Limited (BNFL). The WVDP is a waste management effort being conducted by the United States Department of Energy (DOE) at the site of the only commercial nuclear fuel reprocessing facility to have operated in the United States. This facility is part of the Western New York Nuclear Service Center (WNYNSC), which is owned by the New York State Energy Research and Development Authority (NYSERDA). As authorized by Congress in 1980 through the West Valley Demonstration Project Act (WVDP Act, Public Law 96-368), the DOE's primary ...
As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a ...
In 2001, the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA/NSO) remediated six areas associated with Amchitka mud pit release sites located on Amchitka Island, Alaska. This included the construction of seven closure caps. To ensure the integrity and effectiveness of remedial action, the mud pit sites are to be inspected every five years as part of DOE's long-term monitoring and surveillance program. In August of 2006, the closure caps were inspected in accordance with the ''Post-Closure Monitoring and Inspection Plan for Amchitka Island Mud Pit Release Sites'' (Rev. 0, November 2005). This post-closure monitoring report provides the 2006 cap inspection results.
Corrective Action Unit (CAU) No. 92, the Area 6 Decontamination Pond Facility (DPF), is an historic disposal unit located at the Nevada Test Site (NTS) in Nye County, Nevada (Figures 1 - 1, 1-2, and 1-3). The NTS is operated by the U.S. Department of Energy, Nevada Operations Office (DOE/NV), which has been required by the Nevada Division of Environmental Protection (NDEP) to characterize the DPF under the requirements of the Resource Conservation and Recovery Act (RCRA) Part A Permit (NDEP, 1995) for the NTS and Title 40 Code of Federal Regulations (CFR) Part 265 (1996c). The DPF is prioritized in the Federal Facility Agreement and Consent Order (FFACO, 1996) but is governed by the permit. The DPF was characterized through sampling events in 1994, 1996, and 1997. The results of these sampling events are contained in the Final Resource Conservation and Recovery Act Industrial Site Environmental Restoration Site Characterization Report, Area 6 ...
The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. ...
This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines.
This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams.
This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.
The U.S. Department of Energy Order 435.1, Radioactive Waste Management, requires a disposal authorization statement authorizing operation (or continued operation) for low-level waste disposal facilities. In fulfillment of these requirements, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area burial grounds and the 200 West Area burial grounds. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area low-level burial grounds be written and approved by the Richland Operations Office. As a result of a record of decision for the Hanford Site Solid Waste Program and acceptance of the Hanford Site Solid Waste Environmental Impact Statement, the use of the low-level burial ground (LLBG) as a disposal facility for low-level and mixed low-level wastes has been ...
The Two-Column Aerosol Project (TCAP) field campaign will provide a detailed set of observations with which to (1) perform radiative and cloud condensation nuclei (CCN) closure studies, (2) evaluate a new retrieval algorithm for aerosol optical depth (AOD) in the presence of clouds using passive remote sensing, (3) extend a previously developed technique to investigate aerosol indirect effects, and (4) evaluate the performance of a detailed regional-scale model and a more parameterized global-scale model in simulating particle activation and AOD associated with the aging of anthropogenic aerosols. To meet these science objectives, the Atmospheric Radiation Measurement (ARM) Climate Research Facility will deploy the ARM Mobile Facility (AMF) and the Mobile Aerosol Observing System (MAOS) on Cape Cod, Massachusetts, for a 12-month period starting in the summer of 2012 in order to quantify aerosol properties, radiation, and ...
In the geological disposal facility of the high-level radioactive waste, a group of galleries is designed in parallel at the depth of more than 300 m below surface. This is an unprecedented structure in the field of conventional engineering, and it is necessary to take this characteristic into consideration in the design of the galleries. In the geological disposal facility, as well as ensuring the dynamic stability of the gallery during construction and operational periods, it is necessary to evaluate the EDZ adequately for long-term stability after the closure. In this study, analysis of the 'multi tunnels model' which represents the whole gallery group was performed and the results about the outbreak behavior of EDZ were summarized. (author)
... is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP ...
... projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan, without ...
This document provides environmental information on postulated closure options for the Savannah River Laboratory Seepage Basins at the Savannah River Plant and was developed as background technical documentation for the Department of Energy`s proposed Environmental Impact Statement (EIS) on waste management activities for groundwater protection at the plant. The results of groundwater and atmospheric pathway analyses, accident analysis, and other environmental assessments discussed in this document are based upon a conservative analysis of all foreseeable scenarios as defined by the National Environmental Policy Act (CFR, 1986). The scenarios do not necessarily represent actual environmental conditions. This document is not meant to be used as a closureplan or other regulatory document to comply with required federal or state environmental regulations.
In June 1997, the US Navy plans to close its Naval Air Facility on Sand Island and transfer the atoll to the US Fish and Wildlife Service for use as a National Wildlife Refuge. Midway provides breeding and feeding habitat for migratory seabirds, terrestrial and marine mammals, sea turtles and other reptiles, and a variety of reef fishes and invertebrates. As part of the base closure and transfer process, 36 sites of potential environmental concern were identified on Sand and Eastern islands. These sites include landfills and uncontrolled disposal areas, hazardous materials storage areas, abandoned transformers, sewer outfalls, and other potential hazardous waste sites. Potential contaminants include pesticides, PAHs, PCBs, and heavy metals. A screening ecological risk assessment was performed at each site with a goal of determining whether contaminants could pose any current or future risks to protected migratory bird or ...
The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planning assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily.
This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.
All the tests have been finished up in the Waste Management and Disposal Facility which has been used for the safety tests of solidified radioactive waste on sea dumping disposal. The decommissioning of this facility was performed for use of radioisotopes. This report describes the plan on decommissioning of facility for use of radioisotopes, the contamination checking methods and measurement of radioactivity, the fore case and practice for amount of generated radioactive wastes, the operation procedures for dismantlement, the safety measures, the expenses for decommissioning and so on. (author)
This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites for sludge from ...
This Radioactive and Mixed Waste Management Plan for the Hazardous Waste Handling Facility at Lawrence Berkeley Laboratory is written to meet the requirements for an annual report of radioactive and mixed waste management activities outlined in DOE Order 5820.2A. Radioactive and mixed waste management activities during FY 1994 listed here include principal regulatory and environmental issues and the degree to which planned activities were accomplished.
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated ...
Implementation of a plan to charge waste management costs to the facility that generates such waste requires a long-term commitment and consistent administration. The benefit is that generators are provided the incentive to optimize waste management practices if the charges are appropriately applied. This paper summarizes (1) a plan to charge waste generators, (2) the administrative structure of the plan, (3) a comparison between the rate structure and changes in waste disposal operations, and (4) issues that have surfaced as the plan is implemented. 2 refs., 1 fig., 1 tab.
This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.
This plan describes the Quality Assurance Program which will be applied to spent fuel handling and packaging tests conducted at the Area 25 E-MAD facility, Nevada Test Site (NTS).
This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 {open_quotes}Nuclear Facilities{close_quotes}. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP.
A 67-year-old man presented with gastrointestinal bleeding resulting from a fistula between the aortic stump and the fourth part of the duodenum 14 months after an axillobifemoral bypass, graft excision, and aortic stump closure for aortic graft infection. The patient initially refused any attempt at definitive surgical treatment so coil embolization of the aortic stump was performed via a brachial approach. Coil embolization may be a useful adjunct in the management of such difficult problems. This approach may buy time and allow careful planning of a definitive treatment or may serve as a palliative procedure in inoperable patients. PMID:15947052
15 to 75% of the gun barrel diameter. Similarly, model masses typically vary from 0.01 to 100 .... taining acceptable levels of gun barrel erosion. The ...
Program Plans, Implementation, & Results Energy Management at Federal Facilities Energy Management at DOE Fleet Management Interagency Coordination Interagency Energy...
Two complementary computer programs have been developed for forecasting the demands and evaluating the costs of proposed radiographic facilities. The models are employed here in analyses of the sensitivity...Full Text Available
...capacity, and ownership of all planned and existing onshore pipelines, storage facilities, refineries, petrochemical...will be served by the port, including: (i) Onshore pipelines; (ii) Storage facilities; (iii)...
The purpose of this analysis is to develop a systematic program of projects that will result in energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan for the Stratford Army Engine Plant in Stratford, Connecticut. Reduced energy consumption is a stated goal for the Army Facility Energy Plan.
This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also ...
'As part of the Computer Protection Plan, this Network Security Plan identifies the specific security measures used to protect Bechtel Hanford, Inc.'s (BHI's) enterprise network. The network consists of the communication infrastructure and information systems used by BHI to perform work related to the Environmental Restoration Contract (ERC) at the Hanford Site. It provides electronic communication between the ERC-leased facilities in Richland, Washington, and facilities located on the Hanford Site. Network gateways to other site and offsite networks provide electronic communication with the remainder of the Hanford community.'
Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.
This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.
The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.
This document establishes the minimum training requirements for the Plutonium Finishing Plant (PFP) personnel who are responsible for management of dangerous waste. The training plan outlines training requirements for handling of solid dangerous waste during generator accumulation and liquid dangerous waste during treatment and storage operations. The implementation of this training plan will ensure the PFP facility compliance with the training plan requirements of Dangerous Waste Regulation. Chapter 173-303-330. Washington Administrative Code (WAC). The requirements for such compliance is described in Section 11.0 of WHC-CM-7-5 Environmental Compliance Manual.
This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department.
Atrial septal defect closure is now routinely performed using a percutaneous approach under echocardiographic guidance. Centrally located, secundum defects are ideal for device closure but there is...Full Text Available
Japan Atomic Energy Research Institute (JAERI) is developing the world`s strongest spallation neutron source using high power proton accelerator and promoting a neutron science project for comprehensive studies on basic science and nuclear transmutation of high-level radioactive nuclide from nuclear power stations. For this purpose, JAERI organized the Special Taskforce for Neutron Science and OMEGA Project in April 1996 and reorganized it to Center for Neutron Science in April 1997. During this period, various research plans using the spallation neutron source are proposed and facilities necessary for research are studied by mainly research groups of JAERI. This report describes research plans and results of the preliminary conceptual design study on proposed facilitiesplan. (author)
The number of spent fuel storage facilities in the world continues to increase because of "Wait and See" policies and delay of a permanent disposal plan. The temporary spent fuel storage concept is changing to a pre-disposal storage concept. Strengthened safety concepts are required for expanded spent fuel storage facilities and sites. The Korea Hydro and Nuclear Power Company is planning to construct a reinforced concrete MACSTOR-400 facility at Wolsung. In concrete dry spent fuel storage structures, cracks can occur due to radiant heat and environmental chloride. The likelihood of cracking increases over time. Research on changes in shielding performance from one collinear crack in the surface of a concrete facility has been carried out. However there is no research about public radiolog...
When any new accelerator or storage ring is built that advances the state of the art, the diagnostic system becomes extremely important in tuning the facility to full specification. This paper will discuss the various diagnostic devices planned or under construction for the PSR and their connection into the control system.
The technology being evaluated is the Modified In-Situ (MIS) retorting process for raw shale oil production, combined with a Circulating Fluidized Bed Combustor (CFBC), for the recovery of energy from the mined shale. (VC)
The technology being evaluated is the Modified In-Situ (MIS) retorting process for raw shale oil production, combined with a Circulating Fluidized Bed Combustor (CFBC), for the recovery of energy from the mined shale. (VC)
This inspection plan is written to meet the requirements of WAC 173-303 for operations of a TSD facility. Owners/operators of TSD facilities are required to inspection their facility and active waste management units to prevent and/or detect malfunctions, discharges and other conditions potentially hazardous to human health and the environment. A written plan detailing these inspection efforts must be maintained at the facility in accordance with Washington Administrative Code (WAC), Chapter 173-303, ``Dangerous Waste Regulations`` (WAC 173-303), a written inspection plan is required for the operation of a treatment, storage and disposal (TSD) facility and individual TSD units. B Plant is a permitted TSD facility currently operating under interim status with an approved Part A Permit. Various ...
A simplified stormwater management model has been developed to provide an inexpensive, flexible tool for planning and preliminary sizing of stormwater facilities. The model was developed to be part of a methodology for use in the management of stormwater that utilizes both simple...
Waste Management Area U (WMA U) includes the U Tank Farm, is currently regulated under RCRA interim-status regulations, and is scheduled for closure probably post-2030. Groundwater monitoring has been under an evaluation program that compared general contaminant indicator parameters from downgradient wells to background values established from upgradient wells. One of the indicator parameters, specific conductance, exceeded its background value in one downgradient well triggering a change from detection monitoring to a groundwater quality assessment program. The objective of the first phase of this assessment program is to determine whether the increased concentrations of nitrate and chromium in groundwater are from WMA U or from an upgradient source. Based on the results of the first determination, if WMA U is not the source of contamination, then the site will revert to detection monitoring. If WMA U is the source, then a second part of the groundwater quality ...
The brochure contains information about the Emergency Planning and Community Right-to-Know Act. This law establishes a structure at the state and local levels to assist communities in planning for chemical emergencies and requires facilities to provide information on various chemicals present in the community. The Act requires that this information be made available to the public. One of the requirements concerns the reporting of annual releases of toxic chemicals to the air, water, and land. These provisions are outlined in Section 313 which mandates annual release reporting for over 300 chemicals.
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the ...
A reliable inventory control system was developed at the Fast Flux Test Facility (FFTF) to keep track of the occupancy of 900 refueling facility locations, to compile historical data on the movement of each reactor assembly, and to simulate assembly moves. The simulate capability is valuable because it allows verification of documents before they are issued for use in the plant, and eliminates the possibility of planning illegal or impossible moves. The system is installed on a UNIVAC 1100 computer and is maintained using a data base management system by Sperry Univac called MAPPER.
The purpose of the work reported in this paper was to measure the radionuclide buildup in primary heat transport system cell No. 3 at the Fast Flux Test Facility (FFTF) and to compare the results with predicted values from a model based on experimental studies and experience at similar reactors. The information obtained is used for maintenance planning and to enhance ability to assess radionuclide buildup in the future at FFTF and in other reactors.
The success in developing of the oil industry operating in offshore-onshore terminals, connected by pipelines with the facilities of the coastal zone, can be attributed partially to the beach morpho dynamic monitoring. This study represents a solution to the concerns of the technical operations in coastal zones because it minimizes the impact of the petroleum production and it assures the environmental protection associated to the risks of the pipelines breaking. This impact type results mainly of the vertical and horizontal displacements of the beach, from the coastal dunes to the shore face. The mobility of the profile is associated to the magnitude of the sedimentary processes, which reproduce naturally or not, in scale of time that can vary among few days, years or decades. For the monitoring and interpretation of the beach profile mobility the following methods are recommended: calculation of the closure depth with base in the wave data; ...
This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH ...
In this paper we present status and developments of the Duke storage ring facility. The Duke storage ring facility provides the unique combination of phase-locked light sources ranging from high power OK-4 XUV FEL to quasimonochromatic {gamma}-ray beam and IR/X-ray spontaneous radiation. The XUV OK-4 FEL, which is collaborative project with BlNP, Novosibirsk, is in operation since November, 1996. The OK-4 UV FEL is also used for production of nearly monochromatic {gamma}-ray s with tunable energy. We present the results of UV lasing with the OK4 FEL and selected results of its applications. We will discuss our future plans for extension of this source and status of the construction of dedicated used facility adjacent to the FEL building. (author)
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program ...
The united research plan named 'Boiling' is created on the basis of several cryogenic research projects developed by experts in Russia and Ukraine for International Space Station. The 'Boiling' plan includes 8 first experiments aimed at investigating the influence of microgravity on boiling processes, heat transfer and hydrodynamics in liquid helium being either under normal or superfluid conditions. The experiments are supposed to be carried out with individual cells collected inside a single cryogenic onboard experimental facility. The international research program experiments are characterized by the following features: utilization of several artificially simulated microgravity levels, owing to rotation of the experimental helium cryostat; visualization of the processes that occur in liquid helium; research of boiling and hydrodynamics both in a large volume of stationary liquid, and in a liquid flow running through a ...
Urban type R D (research and development) facilities have research institute functions which are not desirable to coexist in a city as compared with suburban R D facilities. Therefore careful consideration must be given to environmental protection. KSP is the first large scale urban type R D facility in Japan. The planning and construction have been made with the theme of realization of flexibility in architecture and mechanical planning as well as realization of environmental integrity. To achieve the target so-called technical slit is built at the center of the building to provide a void space for securing natural ventilation. It is effective for provision of internal mechanical spaces without spoiling urban View air exhaust from laboratories natural ventilation for underground parking lots and decrease of damage by strong wind on the ground level. Standards are established and ...
The specific objectives of the work were defined by the Environmental Evaluation Group (EEG) as follows: (1) assess the stability of panel 1 during the proposed operation of waste emplacement; (2) estimate the amount of time before room closure would be expected to transfer rock loads to the waste packages. The work consisted of (1) an analysis of geotechnical data and a review of the Department of Energy`s (DOE) plans for waste emplacement in panel 1, (2) an evaluation of ground conditions based on data analysis and observations of changes in ground conditions since the first evaluation in 1993 (USBM 1993), and (3) preparation of a report and presentation of the results to EEG staff. Excluded from this study are radiological safety issues and policies. The study is based on data provided by DOE and Westinghouse Electric Corporation (operator of the site) and conversations with DOE and Westinghouse personnel. MTI cannot independently verify the ...
The FFTF Standby Plan, Revision 0, provides changes to the major elements and project baselines to maintain the FFTF plant in a standby condition and to continue washing sodium from irradiated reactor fuel. The Plan is consistent with the Memorandum of Decision approved by the Secretary of Energy on January 17, 1997, which directed that FFTF be maintained in a standby condition to permit the Department to make a decision on whether the facility should play a future role in the Department of Energy`s dual track tritium production strategy. This decision would be made in parallel with the intended December 1998 decision on the selection of the primary, long- term source of tritium. This also allows the Department to review the economic and technical feasibility of using the FFTF to produce isotopes for the medical community. Formal direction has been received from DOE-RL and Fluor 2020 Daniel Hanford to implement the FFTF ...
Taiwan`s LNG consumption is planned to rise more than threefold over the next four years as medium-term plans to develop power generation facilities increasingly rely on gas-fired combined-cycle stations to avoid the threat of power shortages. State-run Taiwan Power Company (Taipower) expects its LNG consumption to rise from 1.1 mn tonnes in 1996 to 3.4 mn tonnes in the year 2000. By then the first of several gas-fired private power stations is expected to enter service, further increasing Taiwan`s total LNG requirement for power generation. (Author)
Contract No. DACA 90-8l-C-oo72 directs that a basewide energy study be accomplished for the Mannheim and Pirmasens Military Communities, Federal Republic of Germany. The project is identified as Energy Engineering Analysis Program (EEAP) Package No. 5. The overall objective of the study is to produce a systematic plan of improvement projects that will reduce by 1985 the energy consumption in compliance with the Army Facilities Energy Plan without decreasing the readiness posture of the Army.
PurposeWound infection after an ileostomy reversal is a common problem. To reduce wound-related complications, purse-string skin closure was introduced as an alternative to conventional...Full Text Available
This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work ...
This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance ...
This hazard analysis (HA) has been prepared for the 300 Area N Reactor Fuel Fabrication and Storage Facility (Facility), in compliance with the requirements of Westinghouse Hanford Company (Westinghouse Hanford) controlled manual WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual, and to the direction of WHC-IP-0690, Safety Analysis and Regulation Desk Instructions, (WHC 1992). An HA identifies potentially hazardous conditions in a facility and the associated potential accident scenarios. Unlike the Facility hazard classification documented in WHC-SD-NR-HC-004, Hazard Classification for 300 Area N Reactor Fuel Fabrication and Storage Facility, (Huang 1993), which is based on unmitigated consequences, credit is taken in an HA for administrative controls or engineered safety features planned or in place. The HA is the foundation for the ...
The National Ignition Facility (NIF) will be a U.S. Department of Energy (DOE) national center for inertial confinement fusion (ICF) and other research into the physics of high temperatures and high densities, and a vital element of the DOE`s nuclear weapons Stockpile Stewardship and Management Program. It will be used by scientists from a numerous different institutions and disciplines to support research advancements in national security, energy, basic science, and economic development. Multiple powerful laser beams will `ignite` small fusion targets, helping liberate more energy than is required to initiate the fusion reactions. This paper discusses the Design for Environment process for NIF, some of the subsequent activities resulting from the initial study, and a few of the lessons learned from this process. Subsequent activities include the development of a Pollution Prevention and Waste Minimization Plan (P2/WMin) for the ...
The Materials & Fuel Complex (MFC) facilities 799 Sodium Processing Facility (a single building consisting of two areas: the Sodium Process Area (SPA) and the Carbonate Process Area (CPA), 799A Caustic Storage Area, and 770C Nuclear Calibration Laboratory have been declared excess to future Department of Energy mission requirements. Transfer of these facilities from Nuclear Energy to Environmental Management, and an associated schedule for doing so, have been agreed upon by the two offices. The prerequisites for this transfer to occur are the removal of nonexcess materials and chemical inventory, deinventory of the calibration source in MFC-770C, and the rerouting and/or isolation of utility and service systems. This report provides a description of the current physical condition and any hazards (material, chemical, nuclear or occupational) that may be associated with past operations of these ...
This document is the third annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in 1992 as ES/ER-17&D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date in implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act ...
The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the Department of Energy Oak Ridge Field Office (DOE-OR), the US Environmental Protection Agency (EPA)-Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA was January 1, 1992. Section 9 and Appendix F of the agreement impose design and operating requirements on the Oak Ridge National Laboratory (ORNL) liquid low-level radioactive waste (LLLW) tank systems and identify several plans, schedules, and assessments that must be submitted to EPA/TDEC for review or approval. The initial issue of this document in March ...
The production of the uranium mine Zirovski Vrh ceased in 1990. The main remaining problem of the remadiation are mine and mill tailings. The uranium mine Zirovski Vrh has one mill tailings site Borst and one waste pile Jazbec. According to the Act on protection against ionising radiation and nuclear safety which was adopted by the Parliament in 2002, they are classified as radiation facilities. Slovenian Nuclear Safety Administration (SNSA) is authorised for issuing a mandatory consent to mining work. The SNSA prepared the initial proposal of content of the safety report for the mine waste pile Jazbec. In 2005, according to the detailed content of this document, the public company Zirovski Vrh Ltd prepared the safety report which was examined by an authorised expert for radiation and nuclear safety. After a careful revision of the safety evaluation report, the consensus for mining work shall be issued by the SNSA. After finishing the mining works the SNSA shall ...
Two of the US Department of Energy's (DOE) nuclear waste management-related goals are to ensure that waste management is not an obstacle to the further development of light-water reactors and the closure of the nuclear fuel cycle and to fulfill its institutional responsibility for providing safe storage and disposal of existing and future nuclear wastes. As part of its approach to achieving these goals, the Office of Remedial Action and Waste Technology of DOE established what is now called the Nuclear Waste Treatment Program (NWTP) at the Pacific Northwest Laboratory during the second half of FY 1982. To support DOE's attainment of its goals, the NWTP is to provide technology necessary for the design and operation of nuclear waste treatment facilities by commercial enterprises as part of a licensed waste management system and problem-specific treatment approaches, waste form and treatment process adaptations, equipment ...
Low and intermediate waste disposal facilities safety assessment is comprised of several steps from site selection , construction and operation to post-closure performance assessment. This is a multidisciplinary and complex task , and can not be analyzed by one expert only. This high complexity can lead to ambiguity and vagueness in information and consequently in the decision making process. In order to make the decision process clear and objective, there is the need to provide the decision makers with a clear and comprehensive picture of the whole process and, at the same time, simple and easily understandable by the public. This paper suggests the development of an inference system based on fuzzy decision making methodology. Fuzzy logic tools are specially suited to deal with ambiguous data by using language expressions. This process would be capable of integrating knowledge from various fields of environmental sciences. It has an advantage ...
Long crack fatigue threshold ({delta} K{sub th}) and crack closure behaviour of two thermomechanically processed microalloyed (MA) ferrite-pearlite steels are reported. {delta} K{sub th} and crack closure were measured using a dynamic compliance measurement technique. Crack closure was observed at low load ratios (R < 0.5) and the fatigue thresholds decreased with increasing load ratio. In both steels, the closure-free intrinsic threshold ({delta} K{sub eff} {sub th}) was found to be independent of the load ratio. (orig.)
The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.
A schematic of the Bench cavity receiver system is given, and the primary objectives, schedule and research plan for each of four tests are discussed. The tests are: (1) cold flow testing to functionally check all valves and their response using high pressure nitrogen gas; (2) a hot checkout to simulate both steady state and transient flux inputs to the receiver which are expected at the French facility; (3) basic performance using solar energy at the French facility; and (4) ir radiant heat testing. (LEW)
This document defines the services the Waste Sampling and Characterization Facility (WSCF) shall provide Effluent Monitoring (EM) throughout the calendar year for analysis. The internal memo contained in Appendix A identifies the samples Em plans to submit for analysis in CY-1995. Analysis of effluent (liquid and air discharges) and environmental (air, liquid, animal, and vegetative) samples is required using standard laboratory procedures, in accordance with regulatory and control requirements. This report describes regulatory reporting requirements and WSCF services and data quality objectives.
The paper discusses some of the assumptions and methods employed for the control of ionizing radiation in the specifications for the civil construction of a planned free electron laser facility based on a 200 MeV, 5 mA superconducting recirculation electron accelerator. Consideration is given firstly to the way in which the underlying building configuration and siting aspects were optimized on the basis of the early assumptions of beam loss and radiation goals. The various design requirements for radiation protection are then considered, and how they were folded into an aesthetically pleasing and functional building. copyright 1997 American Institute of Physics.
The exchange of information and experience among Member Sates is an essential component of the IAEA action plan for addressing the Year 2000 problem. The objective is to enable Member States to identify any gaps in their own conversion programmes, benefit form the experience of others in developing remedial actions and establish the basis for future action to solve remaining problems. Experts in Year 2000 issues particularly those related to digital equipment prepared this report dealing with nuclear fuel cycle facilities
This document provides information on septic systems with a design capacity of greater than 14,500 gal/d and cribs submitted as requested by the Washington State Department of Ecology. Data for this submittal were taken from the Waste Information Database System (WIDS) and the Hanford Environmental Compliance Record (HECR) database. The current definition used in WIDS for an ''inactive facility'' is one that either no longer receives waste or plans to in the future. Information concerning the deactivation method for a facility is included when such information is available.
With major D&D projects ongoing or being planned, and also with the daily management of radwaste from nuclear facilities, the potential role of transport packagings has often been overlooked: here will one rely essentially on drums, there several local waste processing units are built, elsewhere decommissioned facilities are cut in small bits to fit into small containers by far less efficient. The present paper proposes to illustrate how integrating a transport system from the start may influence operational choices of waste management.
This is the ninth quarterly report as required by the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1990), also known as the Tri-Party Agreement, established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The Tri-Party Agreement sets the plan and schedule for achieving regulatory compliance and cleanup of waste sites at the Hanford Site. This report covers progress for the quarter that ended June 30, 1991. A total of 87 milestones have been completed to date. 39 refs., 1 fig.
...soy, rights, justice, contamination, water, cargill, port soy, rights, justice, contamination, water, cargill, port Friends of the ... The global food giant Cargill has built its own port on the banks of the River Paraguay with plans to expand. It's ...allows Puerto Union, the port facility belonging to the transnational food giant Cargill, to continue operating. This decree was issued despite the ... The Cargill port facility represents a hazard to the water supply of the entire population of the city, and any accident such ...
An operator of FE-closure is introduced on the set of functions of a multivalued logic based on the systems of functional equations. It is proved that, for every k ? 2, the FE-closure operator generates a finite classification on the set P k of functions of k-valued logic. The least class in this classification is shown to be the class H k of all homogeneous functions. Also a series of corollaries are obtained concerning the finite FE-generating sets in the FE-closed classes.
From 1980 to 1993, the domestic production of uranium declined from almost 44 million pounds U{sub 3}O{sub 8} to about 3 million pounds. This retrenchment of the U.S. uranium industry resulted in the permanent closing of many uranium-producing facilities. Current low uranium prices, excess world supply, and low expectations for future uranium demand indicate that it is unlikely existing plants will be reopened. Because of this situation, these facilities eventually will have to be decommissioned. The Uranium Mill Tailings and Radiation Control Act of 1978 (UMTRCA) vests the U.S. Environmental Protection Agency (EPA) with overall responsibility for establishing environmental standards for decommissioning of uranium production facilities. UMTRCA also gave the U.S. Nuclear Regulatory Commission (NRC) the responsibility for licensing and regulating uranium production and related activities, including decommissioning. Because ...
Tiered response is a basic approach to emergency plans, including oil spill response (OSR). This paper delineates a huge set of accidental scenarios within a certain tier of response generated by a computer during risk assessment. Parameters such as the amount of oil spilled, duration of discharge and types of losses should be provided in OSR scenarios. Examples of applications include offshore installations, sub sea or onshore pipelines, and localized onshore facilities. The paper demonstrates how to use risk analysis results for delineating all likely spills into groups that need a specific tier response. The best world practices and Russian regulatory approaches were outlined and compared. Corresponding algorithms were developed and their application in pipelines was presented. The algorithm combines expert's skills and spill trajectory modeling with the net environmental benefit analysis principle into the incident specific ...
The present report describes the study conducted in co-operation with several agencies and organizations from Thailand and covers the energy and electricity requirements and the optimal expansion plans for the power generating system for this country up to year 2011. It is emphasized that the study was carried out by a team of experts from the Electricity Generating Authority of Thailand (EGAT), the National Economic and Social Development Board (NESDB), the National Energy Administration (NEA) and the Office of Atomic Energy for Peace (OAEP), who were fully responsible for all phases of the study, including the production of the present report. The IAEA's responsibility was to provide overall co-ordination and general guidance during the conduct of the study, as well as training and assistance in the implementation and use of the IAEA's computerized planning methodologies on the computer facilities of Thailand. Refs, figs ...
The paper presents the progress of the Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor WWR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for WWR-S decommissioning was also developed. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed ...
In response to US Department of Energy directives, Argonne National Laboratory (ANL) has developed a waste minimization plan aimed at reducing the amount of wastes at this national research and development laboratory. Activities at ANL are primarily research- oriented and as such affect the amount and type of source reduction that can be achieved at this facility. The objective of ANL's waste minimization program is to cost-effectively reduce all types of wastes, including hazardous, mixed, radioactive, and nonhazardous wastes. The ANL Waste Minimization Plan uses a waste minimization audit as a systematic procedure to determine opportunities to reduce or eliminate waste. To facilitate these audits, a computerized bar-coding procedure is being implemented at ANL to track hazardous wastes from where they are generated to their ultimate disposal. This paper describes the development of the ANL Waste Minimization ...
This description of work (DOW) details the field activities associated with the sampling of the vadose zone soils beneath the 1301-N and 1325-N cribs and trenches and will serve as a field guide for those performing the work. These activities are undertaken pursuant to the Hanford Federal Facility Agreement and Consent Order (Ecology et al., 1994a) Milestone M-16-94-01H-Tl and the June 30, 1994 Milestone Change Request M-16-94-02 (Ecology et al., 1994b). Three vadose zone borings, 1301-N-1, 1301-N-2, and 1325-N-1, will be constructed to investigate the vertical and horizontal distribution of radionuclide contamination in sediments beneath the cribs and trenches. The boreholes are also intended to intersect subsurface areas that may have been contaminated by dangerous wastes, i.e., metals, in effluent disposed during past operation of the facilities. This limited field investigation will provide data for the evaluation of remedial alternatives. ...
AREVA is the world leader in the design and construction of nuclear power plants, the manufacture of heavy components, and the supply of nuclear fuel and nuclear services such as maintenance and inspection. The Equipment Division provides the widest range of nuclear components and equipment, manufactured at its two facilities in Jeumont, northern France, and St. Marcel, in Burgundy. The St. Marcel plant, set on 35 ha (87.5 acres) near Chalon-sur-Saone, was established in 1973 in a region with a long history of specialized metalworking and mechanical activities to meet the demand for non-military nuclear requirements in France. The site offers two advantages: - excellent facilities for loading and transporting heavy components on the Saone river, - it's proximity to other group sites. Since its completion in 1975, the Chalon/St. Marcel facility has manufactured all the heavy components for French pressurized water ...
The Buried Waste Integrated Demonstration (BWID) is a program of the Department of Energy (DOE) Office of Technology Development whose mission is to evaluate different new and existing technologies and determine how well they address DOE community waste remediation problems. Twenty-three Technical Task Plans (TTPs) have been identified to support this mission during FY-92; 10 of these have identified some support requirements when demonstrations take place. Section 1 of this report describes the tasks supported by BWID, determines if a technical demonstration is proposed, and if so, identifies the support requirements requested by the TTP Principal Investigators. Section 2 of this report is an evaluation identifying facility characteristics of existing Idaho National Engineering Laboratory (INEL) facilities that may be considered for use in BWID technology demonstration activities.
This report contains preconceptual designs and planning level life-cycle cost estimates for managing hazardous waste. The report`s information on treatment, storage, and disposal modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report.
This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific ...
This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the ...
This report summarizes the activities and major accomplishments for the Idaho National Laboratory Advanced Radiotherapy Research Program for calendar year 2004. Topics covered include boron analysis in biological samples, computational dosimetry and treatment planning software development, medical neutron source development and characterization, and collaborative dosimetry studies at the RA-1 facility in Buenos Aires, Argentina.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Report for the subject facility, represents the results of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. It contains; compliance status, remedial actions, and an implementing manuals report linking S/RID elements to requirement source to implementing manual and section.
This paper describes the research and development activities in three areas of radiation processing, namely: food irradiation, medical product sterilization and wood plastic combination. Plans and efforts exerted to acquire a larger gamma source to augment our present 5,000 curie source are discussed. Cost estimates for a radiation facility are presented on the basis of the market potential of food irradiation and medical product sterilization. Existing local industries that can benefit from the adaptation of irradiation technology in their processing requirements are described.
The report presents a brief synopsis and discussion of wildlife activities undertaken by Bonneville Power Administration. The objectives of the program were wildlife protection, mitigation, and enhancement planning; and implementation of actions to protect, mitigate, and enhance wildlife affected by development and operation of hydroelectric facilities in the Columbia River Basin. (ACR)
The Waste Sampling and Characterization Facility (WSCF) complex consists of the main structure (WSCF) and four support structures located in the 600 Area of the Hanford site east of the 200 West area and south of the Hanford Meterology Station. WSCF is to be used for low level sample analysis, less than 2 mRem. The Laboratory features state-of-the-art analytical and low level radiological counting equipment for gaseous, soil, and liquid sample analysis. In particular, this facility is to be used to perform Resource Conservation and Recovery Act (RCRA) of 1976 and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 sample analysis in accordance with U.S. Environmental Protection Agency Protocols, room air and stack monitoring sample analysis, waste water treatment process support, and contractor laboratory quality assurance checks. The samples to be analyzed contain very low concentrations of radioisotopes. The ...
In the spring of 2002, the Department of Energy provided an initial 1-year grant to the Bureau of Economic Geology (BEG) at The University of Texas at Austin (UT). The grant covered the one-year operational expenses of a worldclass core and cuttings facility located in Houston, Texas, that BP America donated to the BEG. The DOE investment of $300,000, matched by a $75,000 UT contribution, provided critical first-year funds that were heavily leveraged by the BP gift of $7.0 million in facilities and cash. DOE also provided a one-month extension and grant of $30,000 for the month of May 2003. A 5-year plan to grow a permanent endowment in order to manage the facility in perpetuity is well under way and on schedule. The facility, named the Houston Research Center, represents an ideal model for a strong Federal, university, and private partnership to accomplish a national good. This ...
US Department of Energy (DOE) Order 5400.1 requires the preparation of environmental monitoring plans and implementation of environmental monitoring programs for all DOE facilities. The order identifies two distinct components of environmental monitoring, namely effluent monitoring and environmental surveillance. In general, effluent monitoring has the objectives of characterizing contaminants and demonstrating compliance with applicable standards and permit requirements, whereas environmental surveillance has the broader objective of monitoring the effects of DOE activities on on- and off-site environmental and natural resources. The purpose of this document is to support the Environmental Monitoring Plan for the Oak Ridge Reservation (ORR) by describing the groundwater component of the environmental surveillance program for the DOE facilities on the ORR. The distinctions between groundwater effluent ...
It is desired that the data on past ground information are easily picked out and used effectively when construction of power facilities such as power plants is planned. For this purpose, a data base system that is available for survey planning and design business has been developed. This system is divided into subsystems for input, registration, and output, which all can be processed by the personal computers. It also has a retrieval function for maps such as area maps and power facility maps in addition to a retrieval function for characters. As output functions, the system has a function to extract ground information through maps of facilities and their peripheries, an output function for geological profiles and soil test results, and liquefaction analysis and design constant setting support functions. As instances, applications of this system to the thermal power plant location ...
This paper provides guidance in the definition, documentation, measurement, enhancement of processes, and validation of a strategic plan for configuration management (CM). The approach and methodology used in establishing a strategic plan is the same for any enterprise, including the Department of Energy (DOE), commercial nuclear plants, the Department of Defense (DOD), or large industrial complexes. The principles and techniques presented are used world wide by some of the largest corporations. The authors used industry knowledge and the areas of their current employment to illustrate and provide examples. Developing a strategic configuration and information management plan for DOE Idaho Field Office (DOE-ID) facilities is discussed in this paper. A good knowledge of CM principles is the key to successful strategic planning. This paper will describe and define CM elements, and ...
Nuclear power plants of 20 units of in Korea are generating about 700 MTU of spent fuels annually. The inventory of spent fuels in Korea were estimated about 10,087.07 MTU at end of 2008, and the storage space of spent fuels won't be available any more at 2016 due to the saturation of the spent fuel pools in the plants. In addition, in order to reduce carbon emission and correspond to the enormous electricity demand in Korea, 8 units of nuclear power plants are under construction and several more plants are under planning. The 100,000 MTU of spent fuel inventory are expected by the year of 2095 in Korea. Therefore, short term and long term of spent fuel management plans are under discussion and implementation in Korea. As a short term of spent fuel management strategy for the target year of 2016, central or local spent fuel dry interim storage options are mostly under discussion. As a long term of management plan, fast ...
This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 409: Other Waste Sites, Tonopah Test Range (TTR), Nevada, in accordance with the Federal Facility Agreement and Consent Order. Located near Area 3 on the TTR approximately 140 miles northwest of Las Vegas, Nevada, CAU 409 is comprised of three Corrective Action Sites (CASs): CAS RG-24-001-RGCR, Battery Dump Site; CAS TA-53-001-TAB2, Septic Sludge Disposal Pit (referred to as Septic Sludge Disposal Pit No.1); CAS TA-53-002-TAB2, Septic Sludge Disposal Pit (referred to as Septic Sludge Disposal Pit No.2). This CADD/CR identifies and rationalizes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no corrective action is deemed necessary for CAU 409. The CADD/CR have been combined into one report based on sample data collected ...
A Lawrence Livermore National Laboratory (LLNL) Management Pre-Start Review (MPR) Team was formed to independently verify the operational readiness of Building 368 (B368) Biosafety Level III (BSL-3) Facility to conduct research with biological pathogens and toxins including those considered Select Agents. Review objectives and criteria were developed from the DOE/NNSA and LLNL requirements. These were provided in the Implementation Plan for the Biosafety Level III (BSL-3) Facility Management Pre-Start Review (BSL-3 MPR) at Lawrence Livermore National Laboratory that was reviewed and approved by DOE/NNSA-LSO. The formal part of the LLNL MPR for the BSL-3 Facility was begun in August of 2005 but work on the MPR was stopped in October of 2005 due to the need for LLNL to reassess organizational and operational controls and respond to Centers for Disease Control and Prevention inquiries related to a shipping ...
The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced ...
The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) administers and operates the Waste Isolation Pilot Plant (WIPP) site, which hosts a deep geologic repository for safe disposal of U.S. defense-related TRU waste and is located 42 kilometers (km) east of Carlsbad, New Mexico. CBFO also manages the National Transuranic Waste Program (NTP), which oversees TRU waste management from generation to disposal. The WIPP began receiving waste in March 1999. In some areas of broad international interest, the CBFO has developed a leading expertise through its 25-year WIPP repository and TRU waste characterization activities. In addition to participating in relevant and beneficial experiments, the CBFO will provide the international community convenient access to this information by sponsoring and hosting symposia and workshops on relevant topics and by participation in international waste management organizations and topical meetings. In recognition of the successes at WIPP, the Inter ...
Japan Atomic Energy Research Institute (JAERI) and High Energy Accelerator Research Organization (KEK) are promoting construction plan of Material-Life Science Facility, which is consisted of Muon Science Facility and Neutron Scattering Facility, in order to open up the new science fields. The Neutron Scattering Facility will be utilized for advanced fields of Material and Life science using high intensity neutrons generated by the spallation reaction induced by injecting a 1 MW pulsed proton beam onto a mercury target. Design of the spallation mercury target system is in progress to obtain good neutron performance keeping high reliability and safety. The target material is mercury. As a result of the spallation reaction, large amount of radioactive spallation products are to be contained in the mercury. Therefore to establish the safety of the target system, transient behaviors of ...
This Maintenance Implementation Plan (MIP)was developed for implementation of the U.S. Department of Energy (DOE) Order 4330.4A, A Maintenance Implementation Program (DOE 1990) which has been replaced by 4330.4B (DOE 1994) at the Hanford Site SWM complex. It addresses maintenance functions associated with SWM, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for SWM was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The objective of this MIP is to provide baseline information for the control and execution of SWM Maintenance activities relative to the requirements of Order 4330.4B, Chapter II. (Nuclear Facilities) It also describes actions that are planned to achieve compliance. Section 2.0 of this MIP ...
This paper provides information on activities undertaken in a non- production oriented metal finishing operation to minimize waste and conserve resources. The facility is a 6000 sq foot shop that typically only deals with prototype parts. Utilizing a plan that includes employee awareness, common sense and existing technology, a noticeable reduction in waste volume has been obtained. Initiatives that are covered include: segregation of cyanide plating solutions, elimination of copper cyanide plating, elimination of hexavalent chromium plating, elimination of vapor degreasing, changing of rinsing practices, and changing a process for cleaning of aluminum parts. Some discussion is also presented on the effectiveness of combining the technologies of physical vapor deposition and electrodeposition to help minimize waste. Plans for additional initiatives including water recycling, elimination of cyanide plating and substitution ...
In 1980 through 1982 a Basewide Energy Systems Plan (BESP) was developed under the direction of the Corps of Engineers at Ft. McClellan to assist the installation in meeting the requirements of the Army Facilities Energy Plan and the ten (10) year Energy Use Reduction Goal. Some of the energy saving projects recommended by the BESP have been implemented. In FY 1977, the total base energy consumption was 1,105,221 MBtu (Million British thermal units). By FY 1987, this had been reduced to 870,900 MBtu, a reduction of twenty-one percent (21%). This resulted in a cost avoidance for FY 1987 over base year FY 1977 of $2,960,986, or a thirty-two percent (32%) reduction.
A negative public reaction is expected to oppose plans of the British energy industry to take valuable sites for industrial and commercial projects on the ground that government demand forecasts are too high and that they downplay conservation. The United Kingdom (UK) Department of Energy points out that public inquiry always accompanies energy installations and defends the projections made by producers even though each study emphasizes the demand for its own form of energy. At issue are plans to open 150 opencast coal mines a year to compensate for diminishing oil and gas supplies, onshore drilling by oil and gas exploration teams on nearly 50,000 km/sup 2/, and sites required for onshore pipelines, synthetic natural gas facilities, pumped storage plants, and nuclear power stations and waste management. The sites under discussion raise aesthetic and ecological concerns. (DCK)
the nozzle ring, the collector cup, and the impeller fuel-distribution ... sity of the vaned collector cup and the fuel-transfer passages ..... closure ...
closure of the BISON network, GOLF and VIRGO will remain the only instruments ...... Faraday Cup solar wind instrument as described in Ipavich et al (1998). ...
This executive summary presents an overview of the investigations, findings, conclusions, and recommendations of the Long Island Regional Planning Board (LIRPB) study of the Potential for Beneficial Use of Waste-to-Energy Facility Ash. The full report consists of the following volumes: Executive Summary; Volume 1: Long Island Ash Management Status; Volume 2: Sampling and Testing Procedures; Volume 3: Environmental Properties; Volume 4: Engineering Properties; Volume 5: Environmental Assessment; Volume 6: Engineering and Economic Evaluation; and Volume 7: Legal and Institutional Issues. Volumes one through seven are briefly summarized in this executive summary with the exception of Volume 2 of the report, which serves as the documentation of the sampling conditions and testing methods used in measuring chemical and physical properties of the ash tested. The study investigated the feasibility of the use of incinerator ash as a substitute for ...
Pilot-plant irradiation began in Hungary in 1969 with the construction of a high-activity multi-purpose /sup 60/Co facility. Technologies for radiation sterilization, food handling, plastics irradiation as well as chemical dosimetry, semiconductor instrumental dosimetry, computer-based construction and control methods have been developed. Our chlorobenzene dose-meter system is used in Hungary and abroad; as a result of an IAEA-organized dosimetric intercomparison the system was adopted as a reference system. The institute has developed into a basic institute for the reconstruction and re-load of old ..gamma..-facilities as well as it serves for the planning, construction and launching of new ones in Hungary.
In 2002, an innovative neutron time-of-flight facility started operation at CERN: n_TOF. The main characteristics that make the new facility unique are the high instantaneous neutron flux, high resolution and wide energy range. Combined with state-of-the-art detectors and data acquisition system, these features have allowed to collect high accuracy neutron cross-section data on a variety of isotopes, many of which radioactive, of interest for Nuclear Astrophysics and for applications to advanced reactor technologies. A review of the most important results on capture and fission reactions obtained so far at n_TOF is presented, together with plans for new measurements related to nuclear industry.
This report summarizes all work of the Limited Energy Study, Energy Engineering Analysis Program (EEAP), Fort Hunter Liggett, California, authorized under Contract Number DACA05-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this study is to develop projects and actions that will reduce facilities energy consumption and operating costs at Fort Hunter Liggett. Implementation of these projects will contribute to achieving the goal of the Army Facilities Energy Plan of a reduction in energy consumption per square foot of building floor area of 20 percent by FY2000 from FY1985 baseline levels.
This document is the safety analysis made by the national association of the local commissions of information about nuclear activities (ANCLI), about the safety of graphite storage silos of Saint Laurent des Eaux nuclear facility. The analysis covers: the operation safety and the accident hypothesis, the monitoring of indoor and outdoor contamination in routine situation, the geotechnical characteristics of the site environment, the isotopic inventory and the estimation of radioactivity in routine and accidental situation, the estimation of doses received by the population in accidental situation and the internal emergency plan. After examination of these different points, the scientific committee of the ANCLI considers that a new global evaluation of risks, which integrates more recent exposure data, has to be carried out. (J.S.)
Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation ...
The LANL Environmental Restoration (ER) Program Office, established in October 1989, is faced with the challenge of assessing and cleaning up nearly 1,8000 potentially hazardous waste sites according to an aggressive corrective action schedule that the Environmental Protection Agency (EPA) mandated on May 23, 1990, in a Resource, Conservation, and Recovery Act (RCRA) Part B Permit. To maximize program efficiency, the ER Program Office will implement a unique management approach designed to maximize the use of laboratory technical expertise. The Installation Work Plan, which provides a blueprint for the program, has been submitted to EPA for review and approval. A work plan for characterization of Technical Area 21, an early plutonium processing facility, is also nearing completion. The feasibility of an expedited cleanup of the Laboratory's worst hazardous waste release has been modelled using a computer code ...
This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes ...
This Maintenance Implementation Plan (MIP) has been developed for. implementation of the US Department of Energy (DOE) Order 4330.4A. Maintenance Implementation Program (DOE 1990) at the Hanford Site Solid Waste complex. It addresses maintenance functions associated with Solid Waste Management, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for Solid Waste was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The MIP assessment disclosed that most elements defined in the order are currently implemented for Solid Waste. It also identified issues which must be addressed to bring the maintenance function into full compliance with DOE Order 4330.4A. These include documentation of the maintenance training program, expanded scope of inspections to ...
Although the Federal Facility Agreement (FFA) addresses the entire Oak Ridge Reservation, specific requirements are set forth for the liquid low-level radioactive waste (LLLW) storage tanks and their associated piping and equipment, tank systems, at ORNL. The stated objected of the FFA as it relates to these tank systems is to ensure that structural integrity, containment and detection of releases, and source control are maintained pending final remedial action at the site. The FFA requires that leaking LLLW tank systems be immediately removed from service. It also requires the LLLW tank systems that do not meet the design and performance requirements established for secondary containment and leak detection be either upgraded or replaced. The FFA establishes a procedural framework for implementing the environmental laws. For the LLLW tank systems, this framework requires the specified plans and schedules be submitted to EPA and TDEC for ...
The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970's, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would ...
The Department of Energy currently has over 100 million liters of high-level radioactive waste in storage at the Savannah River Site (SRS). In the late 1970`s, the Department of Energy recognized that there were significant safety and cost advantages associated with immobilizing the high-level waste in a stable solid form. Several alternative waste forms were evaluated in terms of product quality and reliability of fabrication. This evaluation led to a decision to build the Defense Waste Processing Facility (DWPF) at SRS to convert the easily dispersed liquid waste to borosilicate glass. In accordance with the NEPA (National Environmental Policy Act) process, an Environmental Impact Statement was prepared for the facility, as well as an Environmental Assessment of the alternative waste forms, and issuance of a Record of Decision (in December, 1982) on the waste form. The Department of Energy, recognizing that start-up of the DWPF would ...
The U.S. Department of Energy (DOE) Headquarters and associated contractors have developed an IBM PC-based software package that estimates costs, schedules, and public and occupational health risks for a range of mixed-waste management options. A key application of the software package is the comparison of various waste-treatment options documented in the draft Site Treatment Plans prepared in accordance with the requirements of the Federal Facility Compliance Act of 1992. This automated Systems Analysis Methodology consists of a user interface for configuring complexwide or site-specific waste-management options; calculational algorithms for cost, schedule and risk; and user-selected graphical or tabular output of results. The mixed-waste management activities modeled in the automated Systems Analysis Methodology include waste storage, characterization, handling, transportation, treatment, and disposal. Analyses of treatment options identified ...
This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will ...
Reviewing all hitherto known plans or drafts for a reform of the atomic energy law, one can expect that the current legal concept of affording protection of existing (legal) status of nuclear facilities will not essentially be watered down by future developments, unless an act is passed for a nuclear power phase-out. (orig.) [Deutsch] Die bislang bekannt gewordenen Reformbestrebungen legen die Vermutung nahe, dass der Bestandsschutz fuer atomrechtliche Anlagen, sofern nicht ein Kernenergie-Abwicklungsgesetz zum Tragen kommt, mit Abstrichen auch in Zukunft rechtlichen Bestand haben wird. (orig.)
This article addresses the possibility that electric utilities may not have enough generating capacity to meet the demands on their systems at some future date as a result of a recent spate of plant-construction cancellations, especially of nuclear facilities. It emphasizes that, when that time arrives, utilities will be willing to try every conceivable possibility for preserving the integrity of their systems, and offers differential pricing of electricity as one such possibility. The article also offers a regional analysis of the effect of plant cancellations and of the potential for differential pricing as a preventative of power shortages. 5 tables.
The International Linear Collider Main Linacs are based on superconducting accelerator structures operating at 1.3 GHz. The basis for this design has been developed and tested at DESY and R&D is progressing at many laboratories around the world including DESY, Orsay, KEK, FNAL, SLAC, Cornell, and JLAB. The status of the TESLA-style cavities and rf system will be reviewed and parameters for the ILC linac will be described. The role of the different linac test facilities will discussed and the critical items and R&D program to support a Conceptual Design and Technical Design will be outlined.
We consider a serial supply chain consisting of a raw material supplier, a manufacturer, a distribution centre and a retailer in the presence of time-varying delivery between manufacturer facility and the retailer warehouse. Delivery time functions are developed based on practical data analysis and the cost models for both linear and non-linear delivery time functions are derived. Analytic solution for system with linear delivery times is derived and a search algorithm for system with non-linear delivery times is established. Finally, sensitivity analysis is made to help decision makers achieve a lower total cost in practice.
A computer software system, CLEO, is used to assist in the planning and performance of the reactor refueling operations at the Fast Flux Test Facility (FFTF). It is a recently developed application of artificial intelligence software with both expert systems and automated reasoning aspects. CLEO, an acronym for Cloned LEO, is a logic-based computer program written in Pascal. It imitates the processes that the refueling expert for FFTF performs in organizing the refueling of FFTF. The computer assistant seeks to organize the sequence of core component movements according to the rules and logic used by the expert. In this form, CLEO has aspects that tie it to both the expert systems and automated reasoning areas within the artificial intelligence field.
There is increasing pressure to operate laboratory facilities in environmentally and financially sustainable ways. A key factor in achieving this goal is careful consideration of how energy is used by the buildings' ventilation system, both for conditioning air supplied to the laboratories and the energy used moving air through the building. Traditionally, laboratory energy use is treated as an engineering concern within the scope of the building's overall design and operation. However, this approach limits the involvement of key stakeholders in many important decisions and can lead to unexpected safety concerns for the laboratory's users. We believe that a broad view of the parties affected by a laboratory building's operations is necessary to avoid having the various stakeholders working...
WIPP, intended for underground permanent disposal of defense transuranic waste, is located 40 km east of Carlsbad at a depth of 655 m in the salt beds of the 600-m thick Permian Salado Formation. It will consist of 56 ``rooms`` each 91.5 m long, 10 m wide, and 4 m high, grouped in 8 ``panels`` of 7 rooms each. About 7.5 km of access drifts will also be provided. Excavation began in 1982 and surface/access/test facilities and one panel were completed by 1988, many years before it could be used. Current plans are to start emplacing waste in WIPP in 1998 and continue for 35 years. The north- south drift E140 is the widest (25 ft) of the four main north-south drifts and is the main north-south passage. Plans to conduct experiments with waste in 1993 were abandoned, and the plan now is to use panel 1 for permanent disposal of waste starting in 1998. The stability evaluation resulted in the conclusion that, ...
This paper reports the result obtained during fiscal 1994 on a demonstration research on photovoltaic power generating systems. Solar cells with an output of 750 kW, storage battery facilities with an output of 3,058 kWh, three DC-AC converters with a rating of 250 kW, and a diesel generator with an output of 300 kW having been installed up to the previous fiscal year were combined to perform comprehensive adjustments and tests such as battery charge/discharge tests and AC parallel operation tests. The battery charge/discharge tests revealed that the 10 hour rate discharge capacity meets the specifications, and the batteries are free of deterioration after a demonstration operation of about 4.5 months. Difference between the power generation record and the planned value is thought due to the following reasons: the array output data in a power line connected system come about 90% of the simulation result due to correction coefficient for the ...
The Zaafarana oilfield development, operated by Zaafarana Oil Co. (Zafco) presented a series of unique challenges, including redeployment of an internal-turret mooring system, use of a turret-based electrical-cable jumper system, and permanent use of cable-deployed electric submersible pumps in the gravel-pack well completions. Following a detailed three-dimensional (3D) seismic program, the field was discovered by the first well in December 1990. Four subsequent appraisal wells were drilled. The discovery well and two of the appraisal wells tested oil at rates ranging from 2,000 to 10,100 B/D. Initial development plans called for the use of two conventional platforms with a pipeline to a shore-based treatment and storage terminal. Data acquired from subsequent wells were incorporated into the mapping and reserve estimates resulting in a sharp downgrade of the estimated recoverable reserves. The reduced estimate, combined with a revised pricing scenario, ...
Eaton, in partnership with Oak Ridge National Laboratory and the Electric Power Research Institute (EPRI) has completed a project that applies a combination of wireless sensor network (WSN) technology, anticipatory theory, and a near-term value proposition based on diagnostics and process uptime to ensure the security and reliability of critical electrical power infrastructure. Representatives of several Eaton business units have been engaged to ensure a viable commercialization plan. Tennessee Valley Authority (TVA), American Electric Power (AEP), PEPCO, and Commonwealth Edison were recruited as partners to confirm and refine the requirements definition from the perspective of the utilities that actually operate the facilities to be protected. Those utilities have cooperated with on-site field tests as the project proceeds. Accomplishments of this project included: (1) the design, modeling, and simulation of the anticipatory wireless sensor ...
Logistics modeling is a powerful analytical technique for effective planning of waste storage, treatment, and disposal activities. Logistics modeling facilitates analyses of alternate scenarios for future waste flows, facility schedules, and processing or handling capacities. These analyses provide an increased understanding of the specific needs for waste storage, treatment, and disposal while adequate time remains to plan accordingly. They also help to determine the sensitivity of these needs to various system parameters. This paper discusses a logistics modeling system developed by the Pacific Northwest Laboratory (PNL) to aid in solid waste planning for a large industrial complex managing many different types and classifications of waste. The basic needs for such a system are outlined, and the approach adopted in developing the system is described. A key component of this approach is the development ...
GAO's review of the H-Coal and Exxon projects showed inadequacies in DOE's contracting practices and a failure by DOE to properly plan, manage, and monitor, especially the H-Coal project. The initial Government-industry H-Coal agreements regarding the level of investment by private sponsors and the ceilings imposed on sharing in cost growth were imbalanced. Larger investments by private sponsors and sharing of cost growth provides an incentive to private sponsors to control costs and helps to assure that each party is fully committed to the success of the project. DOE started the H-Coal project prematurely before sufficiently detailed designs were available and without adequate project planning for functions such as construction scheduling, materials handling, inventory systems, and quality control. DOE staffing was inadequate at both projects to effectively monitor progress and contribute to timely decisions. Its contracts ...
Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Program Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence ...
Ventricular septal defect after acute myocardial infarction (AMI) is a complication associated with poor outcome in the absence of intervention. We report a case of successful TEE guided transcatheter closure of a post myocardial infarction (MI) ventricular septal defect (VSD) with an Amplatzer occluder in a 79 years old male with cardiogenic shock.
BackgroundDespite the diffusion into practice of percutaneous closure of a patent foramen ovale (PFO) in patients with cryptogenic stroke (CS), the benefits have not been demonstrated,...Full Text Available
Previous studies reveal that dark-induced closure of Samanea leaflets is accompanied by H+ secretion from flexor motor cells. We now report that flexor tissue excised in...Full Text Available
Promoting the exchange of information related to implementation of the As Low as Reasonably Achievable (ALARA) philosophy is a continuing objective for the Department of Energy (DOE). This report was prepared by the Brookhaven National Laboratory (BNL) ALARA Center for the DOE Office of Health. It contains the fifth in a series of bibliographies on dose reduction at DOE facilities. The BNL ALARA Center was originally established in 1983 under the sponsorship of the Nuclear Regulatory Commission to monitor dose-reduction research and ALARA activities at nuclear power plants. This effort was expanded in 1988 by the DOE`s Office of Environment, Safety and Health, to include DOE nuclear facilities. This bibliography contains abstracts relating to various aspects of ALARA program implementation and dose-reduction activities, with a specific focus on DOE facilities. Abstracts included in this bibliography were selected from ...
The saturation of South Korea's at-reactor (AR) spent fuel storage pools will create a necessity for additional spent fuel storage capacity. Because the South Korean government has the plan to increase the number of nuclear power plants from 20 units (end of 2005) to 27 units by 2015, the increase of spent nuclear fuel generation will be accelerated. Because there is no clear national plan for spent nuclear fuel storage and disposal, the utility company (Korea Hydraulic Nuclear Power company) is planning to construct a spent fuel storage facility with 11 000 tHM capacity for Pressurised Water Reactor (PWR). This study is intended to predict the maximum allowable periods when the storage facility will be fully occupied with respect to the already fixed re-racking plan of spent fuel storage pools and construction of new nuclear power plants. The result from this ...
Full text: As one of the Top 5 utilities in Europe, Rheinisch-Westfaelisches Elektrizitaetswerk AG, FWB: RW, RWE, operates a diversified generating capacity of about 45 GW; RWE Power alone generates over 30 GW. Besides a share of approximately 20% nuclear power, a large proportion of the generating base is in lignite and hard coal. RWE has an ambitious, Euro10 bn newbuild program of about 10 GW modern fossil fired plants and further expansion plans across Europe. By 2012, RWE intends to invest between Euro 15 and 20 bn outside Germany.The European Union has a challenging policy to increase the share of renewables, improve energy efficiency, and reduce greenhouse gases by 2020. At the same time, ageing power plants need to be replaced. This requires an enormous investment program across Europe. Nuclear power therefore, as a proven technology with low lifecycle carbon emissions and reasonable lifecycle cost, is a crucial contributor to achieve Europe's 2020 goals. ...
The agreement between the government of Republic Of Korea (ROK) and the IAEA for the application of safeguards was signed and entered into force in 1975. The Additional Protocol (AP) to the Safeguards Agreement between the ROK and the IAEA was signed in 1999 and entered into force on 19 February 2004. Also, Implementation of Integrated Safeguards (IS) was started on 1 July, 2008 after a draw of the broader conclusion. The IAEA provides 2 hours notification for Random Interim Inspection (RII) under IS. For RII, the facility has to prepare the inspection documents in a short time. Therefore, KAERI (Korea Atomic Energy Research Institute) developed a new computerized nuclear material accounting system named KASIS (KAERI Safeguards Information treatment System) to treat the data by on-line for RII. For the efficient IS implementation, KAERI has a plan to upgrade the system to reflect the accounting approaches or reporting procedure according to ...
The Vortec Cyclone Melting System (CMS) facility; to be located at the U.S. Department of Energy (DOE) Paducah Gaseous Diffusion Plant, is designed to treat soil contaminated with low levels of heavy metals and radioactive elements, as well as organic waste. The primary components of Vortec`s CMS are a counter rotating vortex (CRV) reactor and cyclone melter. In the CMS process, granular glass forming ingredients and other feedstocks are introduced into the CRV reactor where the intense CRV mixing allows the mixture to achieve a stable reaction and rapid heating of the feedstock materials. Organic contaminants in the feedstock are effectively oxidized, and the inert inorganic solids are melted. The University of North Dakota Energy {ampersand} Environmental Research Center (EERC) has been contacted to help in the development of sampling plans and to conduct the sampling at the facility. This document is written in a format ...
This document was requested by the Washington State Department of Ecology. Based on the State Underground Injection Control Program, as described in the Washington Administrative Code, French drains and reverse wells are being registered as Class V wells. Information on out-of-service French drains, out-of-service reverse wells, and out-of-service cribs that are deeper than their largest surface dimension is also provided. The data for this submittal were taken from the Waste Information Database System (WIDS) and the Hanford Environmental Compliance Record (HECR) database. The current definition used in WIDS for an ''inactive facility'' is one that either no longer receives waste or plans to in the future. The facilities listed in WIDS as inactive have all been listed as ''out-of-service.'' Information concerning the deactivation method for a ...
JRR-3 is a research reactor of 10 MWt output, which attained the criticality in 1962. All the design, manufacture, installation and others of this reactor were carried out by Japanese technologies, except the fuel and heavy water as the moderator and coolant, therefore it is nicknamed Home-made No.1 Reactor. Recently, due to the change in the state of utilizing research reactors and the rise of quality in the utilization, JRR-3 has become to be unable to meet sufficiently the needs of users. The plan of reconstructing the JRR-3 was considered under such situation, and in order to reuse the reactor building, the reactor proper is removed, and an entirely new, high performance, versatile reactor is to be constructed. In this paper, as to the removal works of the JRR-3 reactor proper, the method of execution, design, the execution of works and so on are outlined. The removal works of the reactor facilities were started in February, 1986. The ...
As shown in various new examples, HABOG facility (Netherlands), CERNAVODA (Candu - Romania), KOZLODUY (WWER - Bulgaria), CHERNOBYL ( RMBK - Ukraine), MAYAK (Spent Fuel from submarine and Icebreakers - Russia), recent studies allow to confirm the flexibility and performances of the CASCAD system proposed by SGN, both in safety and operability, for the dry storage of main kinds of spent fuel. The main features are: A multiple containment barrier system: as required by international regulation, 2 independent barriers are provided (tight canister and storage pit); Passive cooling, while the Fuel Assemblies are stored in an inert atmosphere and under conditions of temperature preventing from degradation of rod cladding; Sub-criticality controlled by adequate arrangements in any conditions; Safe facility meeting ICPR 60 Requirements as well as all applicable regulations (including severe weather conditions and earthquake); Safe handling operations; ...
The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the safety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with future non-nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program will require the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification, to ...
During the second half of 1993, the groundwater at the F-Area Seepage Basins (FASB) was monitored in compliance with Module 3, Section C, of South Carolina Hazardous Waste Permit SC1-890-008-989, effective November 2, 1992. The monitoring well network is composed of 87 FSB wells screened in the three hydrostratigraphic units that make up the uppermost aquifer beneath the FASB. A detailed description of the uppermost aquifer is included in the Resource Conservation and Recovery Act Part B post-closure care permit application for the F-Area Hazardous Waste Management Facility submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) in December 1990. Beginning in the first quarter of 1993, the standard for comparison became the SCDHEC Groundwater Protection Standard (GWPS) specified in the approved F-Area Seepage Basins Part B permit. Currently and historically, gross alpha, nitrate, nonvolatile beta, and tritium are ...
Atomic Energy of Canada has recently submitted for regulatory and public review an Environmental Impact Statement (EIS) on a concept for disposal of Canada`s nuclear fuel waste. The EIS is supported by nine primary references that summarize major aspects of the concept, including a postclosure environmental and safety assessment. The scope of the postclosure assessment is largely determined by the requirements of the Atomic Energy Control Board (AECB) of Canada. These requirements include a quantitative estimate of the annual effective dose equivalent to an individual in the most exposed group of people (the critical group) for 10,000 years following closure of the disposal facility, and a radiological risk criterion with an associated dose rate limit of 0.05 mSv/a. Over this long time frame, a quantitative assessment cannot be based on actual observations, and thus we use scientific arguments and simulations with mathematical models to infer ...
US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this ...
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating ...
Located approximately 350 km east of Newfoundland, on the eastern edge of the Jeanne d'Arc Basin, and approximately 50 km from both the Terra Nova and Hibernia oilfields, the White Rose oilfield is considered the main oil producing basin off the eastern coast of North America. Husky Oil is very active in the region and holds almost 32 per cent net working interest in the Significant Discovery License areas in the Jeanne d'Arc basin. The development of an economically significant oil discovery in the White Rose Significant Discovery Area is being proposed jointly by Husky Oil and Petro-Canada. It is estimated that the project would enable the recovery of an estimated 36 million cubic meters (230 million barrels) of recoverable oil in this area that covers approximately 40 square kilometers. The operators propose to use a ship-shaped floating production, storage and offloading (FPSO) facility which could store up to 135,000 cubic meters (850,000 ...
Significant environmental issues and regulatory proceedings in Alberta were discussed. The Mackenzie Valley Pipeline Project was reviewed in relation to the Deh Cho First Nation's advanced actions in the federal court to enjoin the review panel from proceeding with the review process. The Deh Cho First Nation is seeking a declaration that the plan violates their rights under the Canadian Charter of Rights and Freedoms and the Constitution Act. Various regulatory and government agencies have now developed a plan to coordinate their different regulatory processes and approvals in the Cooperation Plan for the Environmental Impact Assessment and Regulatory Review of the Northern Gas Pipeline project. The Deh Cho allege that they were not afforded the opportunity to participate in the development and implementation of the plan. A review panel plans to proceed once the ...
The Mittelplate oilfield is located in the Waddensea tidelands 8 km off the north sea coast and represents Germany's largest oilfield. Since Mittelplate oil production has started in 1987, RWE Dea AG being the operator in a 50/50 joint venture with Wintershall AG, has continually implemented and improved the sophisticated technology required to exploit natural resources by using safe and environmentally compatible means in the sensitive tideland environment of Mittelplate. Besides the sucessful offshore operations from the man-made Mittelplate Drilling and Production Island, further onshore development has started in 2000 by producing from high-tech ERD wells drilled from onshore locations. The offshore oil production had been transported so far by specially designed tug and tow barges and had been restricted by weather and tide. To overcome this bottleneck and to enable an accelerated offshore drilling and production program a pipeline link between Mittelplate Island and ...
This report was prepared in response to a request from the Nuclear Energy Research Advisory Committee (NERAC) subcommittee on ''Long-Term Isotope Research and Production Plans.'' The NERAC subcommittee has asked for a reply to a number of questions regarding (1) ''How well does the Department of Energy (DOE) infrastructure sme the need for commercial and medical isotopes?'' and (2) ''What should be the long-term role of the federal government in providing commercial and medical isotopes?' Our report addresses the questions raised by the NERAC subcommittee, and especially the 10 issues that were raised under the first of the above questions (see Appendix). These issues are related to the isotope products offered by the DOE Isotope Production Sites, the capabilities and condition of the facilities used to produce these products, the management of ...
Sinus lifting and reconstruction of localized alveolar defects are often required after closure of a large oroantral fistula (OAF) to allow for subsequent implant installation. This study describes a combined surgical technique that involves sinus lifting, bony closure, and reconstruction of the alveolar defect at the site of an OAF. The sinus membrane was reconstructed as a continuous layer by combining the residual sinus membrane with a rotated part of oral mucosa around the OAF. Autogenous bone from the chin and/or ramus was grafted into the prepared sinus space and alveolar defect, and the graft was covered by a buccal advancement flap. This technique was used to treat 8 patients who had large OAFs in the posterior maxillary region. The treatment was successful in all cases, and the te...
In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada, submitted a Benefits Plan for the White Rose Development to the Canada- Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB). This revised document provided the case for requesting an increase in the facility maximum daily production rate and the average annual production rate for the White Rose field from 100,000 barrels per day (bpd) as stated in the approved White Rose Development Plan to 140,000 bpd. In order to determine the potential for increasing oil production through the Floating Production, Storage and Offloading (FPSO) vessel, two things were considered, namely the proper reservoir management of the White Rose field to ensure optimum resource recovery, and the capacity of the FPSO topsides processing system and supporting utilities to accommodate increased production. This document presented a detailed review of ...
In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada submitted a Development Application (DA) to the Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB) for the White Rose Development. This DA was prepared following the Canada-Newfoundland Atlantic Accord Implementation Act and the Canada-Newfoundland and Labrador Atlantic Accord Implementation Newfoundland and Labrador Act. In December 2001, the C-NLOPB approved the White Rose DA. This document outlined a proposed amendment to the original Development Plan involving an expansion of its White Rose Development in the Jeanne d'Arc Basin on the Grand Bank. The expansion will consist of a subsea tie-back to the Floating Production, Storage and Offloading (FPSO) vessel through the existing Southern Glory Hole (SGH) and utilizing a new glory hole constructed approximately 4 km south of the SGH. The document presented an overview of the development; geology, ...
Over the five year period of performance, thirteen task assignments were issued by the DOE to ARINC Research. During the two year base period seven tasks were assigned. Two task assignments were issued for each of the three consecutive one year option periods. Associated with all task assignments were multiple subtasks, some of which required significant effort. These subtasks are appropriately cited in this report under their respective task assignments as principal work activities or deliverables. The technical and management support provided to the DOE under this contract focused on two general areas: (1) appraisal activities and (2) non-appraisal activities. Support to appraisals included planning, document review, developing lines-of-inquiry, interviewing, data collection, report writing, and follow-up. Such work was executed both on-site at the DOE facility under review and off-site. Non-appraisal support was varied and included such ...
The hydromechanical effect of hydroelectric stations on zooplankton is customarily regarded as a constantly acting and comparatively harmless factor, since its destruction is inevitable when water masses are passed through hydroelectric stations, but its capacity for restoration is high (i.e., destruction of the zooplankton of the forebay is compensated by its production in the after bay). It is not known how correct such an opinion is, or what is the true balance of losses and reproduction of zooplankton in the forebays and after bays of hydroelectric stations. However, hydroelectric plants of a new type, pumped-storage plants, have been constructed in recent years and others are planned for the Dnieper reservoirs. The operational principle and purpose of these plants is that they employ special vertical turbine-electric pumps that pump water at night from the reservoirs into pumped-storage facilities at high levels, and then release this ...
The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab) Laboratory Directed Research and Development Program FY 1996 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of the Laboratory Directed Research and Development (LDRD) program planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The Berkeley Lab LDRD program is a critical tool for directing the Laboratory`s forefront scientific research capabilities toward vital, excellent, and emerging scientific challenges. The program provides the resources for Berkeley Lab scientists to make rapid and significant contributions to critical national science and technology problems. The LDRD program also advances the Laboratory`s core competencies, ...
This document establishes the Quality Assurance (QA) Program requirements for the Hazards Waste remedial Actions Program (HASWRAP) for ensuring, with a high degree of confidence, that program objectives will be achieved as planned. The QA Program is introduced in Sect. 1. The HAZWRAP Support Contractor Office (SCO) functional organization and QA responsibilities are shown in Sect. 2. QA program requirements are contained in Sect. 3. These requiremens are pased on the American national Standard, American National Standards Institute/American Society of Mechanical Engineers NQA-1 Quality Assurance Program Requirements for Nuclear Facilities. The 18 elements defined in the standard are tailored to HAZWRAP's needs. The QA program requirements are delineated under the major headings: Quality Assurance Program, Organization, and Control of Quality;two additional program requirements, Software Quality Assurance and Problem Prevention, are included. ...
An Environmental Management Plan (EMP) for the Jharia Coalfield (JCF) was recently completed as part of a World Bank funded project. The JCF, 260 km west of Calcutta, comprises 450 km{sup 2}. Bharat Coking Coal Limited (BCCL) operates an area of 258 km{sup 2}. Coal mining has been conducted for more than 100 years. There are severe constraints to mining due to geology, coal fires and the large population. BCCL counterpart staff participated actively in all aspects of the work. Air and water are heavily polluted, however, mining operations contribute only to a limited extent to the total pollution. Water contamination is generally due to inadequate sewage treatment and discharge from non-mine facilities such as power plants. The large area disturbed by mining to date will increase, as open pit mining operations are expected to expand significantly. Reclamation to date is generally confined to planting of trees. Areas where cost effective ...
The 'high-tension distribution line design support system' was developed for the 'work design support system'. This support system is composed of the work outline editor for preparing work details and facility data and the inference engine for preparing practical design plans, and can check system conditions such as voltage drop and deviation from technical standards automatically. The work outline editor takes charge of selection of work items, selective input of system information, and setting of some conditions such as pole position and reserved load onto a system diagram. The inference engine provides the design plan automatically based on the information inputted by the editor. For the design of high-tension distribution line, such various factors as local condition and load sharing of distribution systems should be considered. This design support system attains efficient processing ...
This publication provides a broad overview of the research programs and efforts being conducted, built, designed, and planned at Brookhaven National Laboratory. This work covers a broad range of scientific disciplines. Major facilities include the Alternating Gradient Synchrotron (AGS), with its newly completed booster, the National Synchrotron Light Source (NSLS), the High Flux Beam Reactor (HFBR), and the RHIC, which is under construction. Departments within the laboratory include the AGS department, accelerator development, physics, chemistry, biology, NSLS, medical, nuclear energy, and interdepartmental research efforts. Research ranges from the pure sciences, in nuclear physics and high energy physics as one example, to environmental work in applied science to study climatic effects, from efforts in biology which are a component of the human genome project to the study, production, and characterization of new materials. The paper provides ...
This publication provides a broad overview of the research programs and efforts being conducted, built, designed, and planned at Brookhaven National Laboratory. This work covers a broad range of scientific disciplines. Major facilities include the Alternating Gradient Synchrotron (AGS), with its newly completed booster, the National Synchrotron Light Source (NSLS), the High Flux Beam Reactor (HFBR), and the RHIC, which is under construction. Departments within the laboratory include the AGS department, accelerator development, physics, chemistry, biology, NSLS, medical, nuclear energy, and interdepartmental research efforts. Research ranges from the pure sciences, in nuclear physics and high energy physics as one example, to environmental work in applied science to study climatic effects, from efforts in biology which are a component of the human genome project to the study, production, and characterization of new materials. The paper provides ...
Total thyroidectomy involving the adjacent structures of the trachea can cause tracheal damage such as early tracheal necrosis. The authors describe the first case of anterior tracheal necrosis following...Full Text Available
Xylem failure via gas embolism (cavitation) induced by water stress was investigated in the palm Rhapis excelsa (Thumb.) Henry. Xylem embolism in excised stems and petioles was detected...Full Text Available
SUMMARYSmall bowel epithelium is at the frontline of intestinal barrier function. Restitution is considered to be the major determinant of epithelial repair as function recovers...Full Text Available
Gastrointestinal perforations are conservatively managed at endoscopy by through-the-scope endoclips and covered self expandable stents, according to the size and tissue features of the perforation....Full Text Available
Several fixed classification experiments test the hypothesis that F1, f0, and closure voicing covary between intervocalic stops contrasting...Full Text Available
An overview is presented of the FFTF reactor and plant together with descriptions of core components, core internals, core system, primary and secondary control rod system, reactor instrumentation, reactor vessel and closure head, and supporting test programs. (DG)
An overview is presented of the FFTF reactor and plant together with descriptions of core components, core internals, core system, primary and secondary control rod system, reactor instrumentation, reactor vessel and closure head, and supporting test programs.
The influence of the sulfur dioxide emissions from a large copper smelter in Tacoma, Washington, USA, was studied by measuring the chemical composition of rainwater collected upwind and downwind of the source, before and after permanent closure of the smelter in 1985. Data analysis was based on a statistical model that accounted for variability associated with location of 25 sampling sites within three geographic regions, smelter operation, ten individual rain events observed over 2 years, and measurement uncertainty. After smelter closure, the upwind-downwind differences in mean hydrogen ion and excess sulfate ion concentrations within a 600 km/sup 2/ region extending to 25 km downwind of the source had decreased significantly compared to the pre-closure value. No significant decreases in mean ion concentrations were observed farther downwind in the Seattle, urban area. During five events sampled prior to smelter ...
Congenital diaphragmatic hernia (CDH) is described as (1) failure of diaphragmatic closure at development, (2) presence of herniated abdominal contents into chest and (3) pulmonary hypoplasia. Usually,...Full Text Available
A meeting was held on October 15, 16, 17, 1990 to discuss the state of tritium safety and environmental effects. The meeting was organized with the help of the International Energy Agency planning committee consisting of K. Steinmetz, Y. Seki, G. Nardella, and G. Vivian. Representative of tritium production facilities and heavy water reactor power production were also involved. The meeting was organized to address seven topics in tritium safety that were thought to require further work. The topics were: (1) materials science, (2) environmental models, (3) environmental model validation, (4) tritiated organic compounds, (5) human dosimetry, (6) tritium sampling and measurement, and (7) long-term environmental databases.
Radioactive waste shipping and receiving facilities presently planned for commercial and defence high level nuclear waste will handle waste packages at frequencies far in excess of those in common practice today. If current limits for radiation levels at the cask surface and current handling methods are used, high cumulative personnel exposure to ionizing radiation is projected to occur. To reduce these exposure levels, alternate handling methods are being developed and demonstrated. The production nature of cask receiving operations suggests commercial robotics be incorporated into a remote handling system to reduce predicted worker exposure to acceptable levels while maintaining or increasing throughput. The first phase of cask handling system development culminated in a proof-of-principle test demonstrating the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner. (author).
Radioactive waste shipping and receiving facilities presently planned for commercial and defense high-level nuclear waste will handle waste packages at frequencies far in excess of those in common practice today. If current limits for radiation levels at the cask surface and current handling methods are used, high cumulative personnel exposure to ionizing radiation is projected to occur. To reduce these exposure levels, alternate handling methods are being developed and demonstrated. The production nature of cask receiving operations, suggests commercial robotics be incorporated into a remote handling system to reduce predicted worker exposure to acceptable levels while maintaining or increasing throughput. The first phase of cask handling system development culminated in a proof-of-principle test demonstrating the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner.
Radioactive waste shipping and receiving facilities presently planned for commercial and defense nuclear waste will handle waste packages at frequencies far in excess of those in common practice today. Unacceptable personnel exposure to ionizing radiation is projected to occur if current limits for radiation levels at the cask surface and current handling methods are used. To reduce these exposure levels, alternate handling methods are being developed and demonstrated. The production nature of cask receiving operations suggests commercial robotics be incorporated into a remote handling system to reduce predicted worker exposure to acceptable levels, while maintaining or increasing throughput. The first phase of cask handling system development culminated in a proof-of-principle test demonstrating the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner. 6 refs., 12 figs.
Truck haulage systems are widely used in open pit mining operations. Thanks to the rapid development and use of personal computers, simulation of haulage systhems involving Computer Aided Design (CAD) facilities and animation has recently become an attractive alternative in the Swedish Mining Industrie compared to the conventional simulations. Furthermore, when planning or simulating hauling operations, it is important to be able to accurately calculate velocities, cycle times and fuel consumption for truck fleets under varying conditions. It is the objective of this paper to present the basic features and principles of two microcomputer programs, TRUCKPER and METAFORA. These programs can be used as an integrated tool for evaluating truck haulage systems in surface mines. (orig.).
The Integral Fast Reactor is an innovative liquid metal reactor concept that is being developed by Argonne National Laboratory. It takes advantage of the properties of metallic fuel and liquid metal cooling to offer significant improvements in reactor safety, operation, fuel cycle economics, environmental protection, and safeguards. The plans for demonstrating the IFR fuel cycle, including its waste processing options, by processing irradiated fuel from the Experimental Breeder Reactor-II fuel in its associated Fuel Cycle Facility have been developed for the first refining series. This series has been designed to provide the data needed for the further development of the IFR program. An important piece of the data needed is the recovery of TRU material during the reprocessing and waste operations.
The Integral Fast Reactor is an innovative liquid metal reactor concept that is being developed by Argonne National Laboratory. It takes advantage of the properties of metallic fuel and liquid metal cooling to offer significant improvements in reactor safety, operation, fuel cycle economics, environmental protection, and safeguards. The plans for demonstrating the IFR fuel cycle, including its waste processing options, by processing irradiated fuel from the Experimental Breeder Reactor-II fuel in its associated Fuel Cycle Facility have been developed for the first refining series. This series has been designed to provide the data needed for the further development of the IFR program. An important piece of the data needed is the recovery of TRU material during the reprocessing and waste operations.
Installation of the major hardware subsystems for MFTF is nearing completion. These subsystems include the Fusion Chamber System, the eighty KV Neutral Beam System, the Superconducting Magnet System, and the Personnel Safety System. The Local Controls group has undertaken a uniform aproach to implementing the control systems for all of these hardware subsystems. This approach has two major aspects: (1) to provide a stand-alone computer control system with a remote, portable terminal so that computer control can be provided at the site of the hardware for initial testing, (2) to provide hardware simulators so that the complicated MFTF computer control system can be tested independent of the hardware. The software and hardware tools which were developed to carry out this plan will be described. Our experiences with bringing up subsystems containing up to 900 separate channels of control and status will also be described.
The Computation Directorate at Lawrence Livermore National Laboratory has four major areas of work: (1) Programmatic Support -- Programs are areas which receive funding to develop solutions to problems or advance basic science in their areas (Stockpile Stewardship, Homeland Security, the Human Genome project). Computer scientists are 'matrixed' to these programs to provide computer science support. (2) Livermore Computer Center (LCC) -- Development, support and advanced planning for the large, massively parallel computers, networks and storage facilities used throughout the laboratory. (3) Research -- Computer scientists research advanced solutions for programmatic work and for external contracts and research new HPC hardware solutions. (4) Infrastructure -- Support for thousands of desktop computers and numerous LANs, labwide unclassified networks, computer security, computer-use policy.
Preliminary plans for the 90 to 100-MW coal-fired combined cycle plant due to be built by a team headed by Southern California Edison and Texaco in the mid-1980s are reviewed. The basic operating goals call for having a gasifier with a 1,000 ton coal capacity per day feeding a 70-MW turbine which then provides waste heat to run a 30-MW steam turbine. Texaco will have responsibility for the gasifier part of the facility with the turbine-generator vendor charged with providing both gas and steam turbine equipment. If the 100-MW demonstration plant achieves 32 to 33% design efficiency, then a commercial plant with expansion turbines and steam reheat should hit 38% and require 20 to 30% less water than a conventional coal fired plant.
The kWh model finds the kWh outputs of each plant and reservoir capacities of hydro and pumped storage plants and minimizes the sum of fixed charges for constructing the reservoirs and generating facilities, also the fuel costs of thermal and nuclear plants. It is a linear programming problem whose constants are represented by nonlinear functions of kW running capacity of each plant. The optimal pattern of nuclear and thermal units is found by solving the linear programming problem derived for the pumped storage and hydroplants. Excluding the upper bound constraints, the number of constraint equations are few and do not increase with the number of units, although the number of variables increases. The computing time increases only in proportion to the number of groupings of generating units. Sensitivity analysis can be done easily. The detailed operational behavior of each generating unit can be taken into account.
The Linac Coherent Light Source [1] (LCLS) at SLAC National Accelerator Laboratory is preparing for the arrival of its first scientific users in the fall of 2009. LCLS is the world's first free-electron in the spectral range 800-8,000 eV, producing intense, sub-picosecond pulses of Xrays with very high spatial coherence. The accelerator facility has been commissioned in stages, beginning in April 2007 [2] with the injector linac and culminating in December 2008 [3] with the first transport of electrons through the complete beam path. On April 10, 2009, the LCLS Project team was rewarded for years of planning, design, construction, and checkout with a dream-come-true: as undulators were placed on the beam path one-by-one, the laser simply turned on without drama in the course of one hour [4...
A series of experiments is to be made during the acceptance test program of the Fast Flux Test Facility (FFTF) to measure the gamma ray characteristics of the Fast Test Reactor (FTR) and to establish the performance characteristics of the reactor shield. These measurements are a part of the FFTF Reactor Characterization Program (RCP). Detailed plans have been developed for these experiments. During the initial phase of the Characteristics Program, which will be carried out in the In-Reactor Thimble (IRT), both active and passive measurement methods will be employed to obtain as much information concerning the gamma ray environment as is practical. More limited active gamma ray measurements also will be made in the Vibration Open Test Assembly (VOTA).
Preparations are under way for the initial startup and testing of the Fast Flux Test Facility (FFTF). The FFTF Reactor Characterization Program is that part of the startup test plan that deals with the determination of the neutron, gamma ray and thermal hydraulic characteristics of the reactor. This program encompasses measurements and calculations of: neutron spectra, flux and fluence; gamma-ray spectra, dose and heating; fission rate distributions; capture rate distributions; other reaction rates of interest; fission product yields; and thermal hydraulic data. Measurements of these parameters will be made in the reactor core and reflectors, will extend vertically downward to the vicinity of the core support structure and upward to the top of the sodium pool, and will extend radially outward to include in-vessel fuel storage locations and the cavity between the reactor vessel and the concrete wall.
This Energy Savings Opportunity Survey (ESOS) is to identify Energy Conservation Opportunities (ECO`s) which are practical and economical for the reduction of energy consumption in accordance with the Army Facilities Energy Plan. The work to be performed under this project includes: (A) Coordinating with the on-going and proposed related projects. (B) Conducting a limited site survey required to identify applicable ECO`s and obtaining necessary data to evaluate the ECO`s. (C) Evaluating applicable ECO`s to determine their feasibility in accordance with current criteria. (D) Preparing programming and implementation documents for the recommended ECO`s. and (E) Preparing a comprehensive report to present the work performed including energy analysis, the results, and recommendations.
In 1976 the design and fabrication began of an 1 MWt Bench Model Solar Receiver (BMSR) to demonstrate and further develop the ceramic tube central receiver concept. Although many of the properties of silicon carbide are well documented, this material has never been utilized in an application of this type and size. Further investigation was undertaken to confirm the choice of silicon carbide against available metals and other ceramic materials. The BMSR is configured for testing at the Department of Energy's Central Receiver Test Facility in Albuquerque, New Mexico. Design and fabrication of the BMSR are highlighted in this report. Completion and testing of the BMSR are planned for the next phase of the project.
In this paper, the question of whether the new distribution system for the electricity supply industry can deliver a better service to customers, is discussed. In particular it discusses the requirement of customers for low cost and efficiency, with particular reference to Victoria in general and Solaris in particular. Solaris comprises the amalgamation of five ex-Municipal Electricity Undertakings and one distribution part of the former State Electricity Commission. Despite not having a set of objectives, a strategy, a common culture, appropriate processes or systems, key account management skills, marketing and customer service expertise, commercial financial expertise, commercial treasury expertise and strategic skill, it has been able to develop a business plan and strategy to satisfy the shareholder (the government), improve customer communication facilities, set up human resource management mechanisms and liaison with the community. The ...
It is planned to bulk-heat a unit cell of a fusion reactor solid-breeder blanket in a fission reactor to study thermo-mechanical and thermal-hydraulic properties of fusion blankets. This study investigates the neutronic feasibility of using the Power Burst Facility (PBF) for this purpose. Heating rates were calculated for a Li/sub 2/O experiment placed in the PBF test space. The ANISN code and a 56-group coupled neutron-gamma library based on FLUNG and VITAMIN C were used to compute the heating rates. The results show that an average heating rate level of 1-3 W/cc can be produced in PBF with a local power profile that should be typical of a fusion blanket unit cell.
The International Atomic Energy Agency (IAEA) plans to use the Common Criteria, as the tool for developing graded and measurable evaluation criteria for information technology (IT) in safeguards systems in facilities subject to IAEA inspection. In their draft paper [ITSECSES] the IAEA defines a three-tiered Vulnerability Assessment Level (VAL) scheme. Each increased VAL level (1-3) defines additional and more stringent security and security-related requirements for the system developer, the system evaluator (assessor or authenticator), and for the IAEA. When all parties meet all requirements for a particular VAL level, IAEA has a measurable degree of confidence in the secure and proper operation of an IT system.
The US Department of Energy has provided support to four universities and the Oak Ridge National Laboratory in order to pursue research leading to the development and deployment of an advanced robotic system capable of performing tasks that are hazardous to humans, that generate significant occupational radiation exposure, and/or whose execution times can be reduced if performed by an automated system. The goal is to develop a generation of advanced robotic systems capable of performing surveillance, maintenance, and repair tasks in nuclear facilities and other hazardous environments. This goal will be achieved through a team effort among the Universities of Florida, Michigan, Tennessee, Texas, and the Oak Ridge National Laboratory, and their industrial partners, Combustion Engineering, Martin Marietta Baltimore Aerospace, Odetics, Remotec, and Telerobotics International. Each of the universities and ORNL have ongoing activities and corresponding ...
Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual ...
The Fast Flux Test Facility (FFTF) reactor, which started operating in 1982, is a 400 MWt sodium-cooled fast neutron reactor located in Hanford, Washington State, and operated by Westinghouse Hanford Co. under contract with U.S. Department of Energy. The reactor has a wide variety of functions for irradiation tests and special tests, and its major purpose is the irradiation of fuel and material for liquid metal reactor, nuclear reactor and space reactor projects. The review first describes major technical specifications and current conditions of the FFTF reactor. Then the plan for irradiation testing is outlined focusing on general features, fuel pin/assembly irradiation tests, and absorber irradiation tests. Assemblies for special tests include the material open test assembly (MOTA), fuel open test assembly (FOTA), closed loop in-reactor assembly (CLIRA), and other special fuel assemblies. An interim examination and maintenance cell (FFTF/IEM ...
The Fast Flux Test Facility (FFTF) reactor, which started operating in 1982, is a 400 MWt sodium-cooled fast neutron reactor located in Hanford, Washington State, and operated by Westinghouse Hanford Co. under contract with U.S. Department of Energy. The reactor has a wide variety of functions for irradiation tests and special tests, and its major purpose is the irradiation of fuel and material for liquid metal reactor, nuclear reactor and space reactor projects. The review first describes major technical specifications and current conditions of the FFTF reactor. Then the plan for irradiation testing is outlined focusing on general features, fuel pin/assembly irradiation tests, and absorber irradiation tests. Assemblies for special tests include the material open test assembly (MOTA), fuel open test assembly (FOTA), closed loop in-reactor assembly (CLIRA), and other special fuel assemblies. An interim examination and maintenance cell (FFTF/IEM ...
The purpose of this study is to develop projects and actions that will reduce facilities energy consumption and operating costs at Fort Hunter Liggett. Implementation of these projects will contribute to achieving the goal of the Army Facilities Energy Plan of a reduction in energy consumption per square foot of building floor area of 20 percent by FY2OOO from FY1985 baseline levels, There are 205 numbered structures at Fort Hunter Liggett, containing a total of 791,034 square feet of gross floor space. This United Energy Study evaluates 52 surveyed buildings with results extended to an additional 44 identical or similar buildings. Together, these buildings contain a total of 632,386 gross square feet and account for approximately 93 percent of overall energy usage. Present Energy Consumption Total energy consumption at Fort Hunter Ligett in FY 1992 of non-transportation energy sources was 79,728 million Btu. This figure ...
The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army. After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, ...
The author have prepared a new, fusion-oriented library of multigroup neutron cross sections, scattering matrices, and covariances (uncertainties and correlations). The 74-group library, called COVFILS-2, has been used, or will be used, by neutronics groups at Los Alamos National Lab. (LANL) at the University of California at Los Angeles, and at the Swiss Federal Institute for Reactor Research in the sensitivity and uncertainty analysis of fusion-relevant integral experiments such as the Li/sub 2/O experiment performed at the Fast Neutron Source Facility in Japan and the Lithium breeding module experiment planned at the LOTUS facility in Lausanne, Switzerland. Another intended use of this library is in the estimation of the uncertainty in key performance parameters (such as the breeding ratio) of conceptual fusion reactors. The 14 materials included in the first version of COVFILS-2 are hydrogen, /sup 6/Li, /sup 7/Li, ...
The author have prepared a new, fusion-oriented library of multigroup neutron cross sections, scattering matrices, and covariances (uncertainties and correlations). The 74-group library, called COVFILS-2, has been used, or will be used, by neutronics groups at Los Alamos National Lab. (LANL) at the University of California at Los Angeles, and at the Swiss Federal Institute for Reactor Research in the sensitivity and uncertainty analysis of fusion-relevant integral experiments such as the Li_2O experiment performed at the Fast Neutron Source Facility in Japan and the Lithium breeding module experiment planned at the LOTUS facility in Lausanne, Switzerland. Another intended use of this library is in the estimation of the uncertainty in key performance parameters (such as the breeding ratio) of conceptual fusion reactors. The 14 materials included in the first version of COVFILS-2 are hydrogen, "6Li, "7Li, beryllium, carbon, ...
The isomeric and {beta}-decay properties of neutron-rich {sup 53-57}Sc and {sup 53,54}Ca nuclei near neutron number N = 32 are reported, and the low-energy level schemes of {sup 53,54,56}Sc and {sup 53-57}Ti are presented. The low-energy level structures of the {sub 21}Sc isotopes are discussed in terms of the coupling of the valence 1f{sub 7/2} proton to states in the corresponding {sub 20}Ca cores. Implications with respect to the robustness of the N = 32 subshell closure are discussed, as well as the repercussions for a possible N = 34 subshell closure.
The "8"6Kr("3He,n)"8"8Sr and "8"8Sr("3He,n)"9"0Zr reactions were studied to determine whether significant excited 0"+ strength was observed or whether these nuclei exhibited absence of excited state strength generally seen away from shell closures. Various properties of the levels are considered including angular distributions, spins, parities, interference, and enhancement. It is concluded that neither "8"8Sr nor "9"0Zr exhibit the strong proton pairing vibration expected for a closed proton shell nucleus.
The masses of 16 neutron-rich nuclei in the mass range from 35 to 45 have been measured using a direct time of flight technique following the fragmentation of a {sup 48}Ca beam at 60 MeV/nucleon. The masses of {sup 35,36}Mg, {sup 38}Al, {sup 39,40}Si, {sup 42,43}P and {sup 43,44}S are reported for the first time. Preliminary analysis shows that the N=28 shell closure persists, even if weakened by the large neutron excess.
The masses of 16 neutron-rich nuclei in the mass range from 35 to 45 have been measured using a direct time of flight technique following the fragmentation of a "4"8Ca beam at 60 MeV/nucleon. The masses of "3"5","3"6Mg, "3"8Al, "3"9","4"0Si, "4"2","4"3P and "4"3","4"4S are reported for the first time. Preliminary analysis shows that the N=28 shell closure persists, even if weakened by the large neutron excess.
The isomeric and ?-decay properties of neutron-rich 53-57Sc and 53,54Ca nuclei near neutron number N=32 are reported, and the low-energy level schemes of 53,54,56Sc and 53-57Ti are presented. The low-energy level structures of the 21Sc isotopes are discussed in terms of the coupling of the valence 1f7/2 proton to states in the corresponding 20Ca cores. Implications with respect to the robustness of the N=32 subshell closure are discussed, as well as the repercussions for a possible N=34 subshell closure.
This bibliography contains abstracts relating to various aspects of ALARA program implementation and dose reduction activities, with a focus on DOE facilities. Abstracts included in this bibliography were selected from proceedings of technical meetings, journals, research reports, searches of the DOE Energy, Science and Technology Database (in general, the citation and abstract information is presented as obtained from this database), and reprints of published articles provided by the authors. Facility types and activities covered in the scope of this report include: radioactive waste, uranium enrichment, fuel fabrication, spent fuel storage and reprocessing, facility decommissioning, hot laboratories, tritium production, research, test and production reactors, weapons fabrication and testing, fusion, uranium and plutonium processing, radiography, and aocelerators. Information on improved shielding design, decontamination, ...
Feasibility study is conducted for introduction of a top pressure recovery turbine (TRT) in China's Panzhihua Iron and Steel (Group) Company, Sichuan Province, for the potential project to simultaneously contribute to abatement of the greenhouse effect gases and to sustainable economic development of the counterpart country. This project considers to adopt the TRTs in 3 blast furnaces (No.1 to 3) of the 4 furnaces in service at the works, producing 2,500,000 t/y of crude steel, where the No.4 furnace is already provided with the model system and not considered in this project. According to the feasibility study results, the total fund required is 5.46 billion yen (Japan-made facilities: 4.172 billion yen, and China-made facilities: 1.288 billion yen), energy-saving effect is 36,467 t/y as crude, greenhouse effect gas emission abatement effect: 112,830 t/y as CO2, and pay-off period is 8.3 years. This plan considers ...
The original plan for support of research in geothermal reservoir engineering, GREMP, is reviewed and compared with accomplishments to date. A commentary on the comparison and an updated plan are presented. Also included are a justification of the updated plan and a revised management plan. (MHR)
Prompted by a $10 million Congressional allocation to identify supplemental actions to protect the Columbia River from groundwater contamination beneath the Hanford Reservation, the U. S. Department of Energy (DOE) Environmental Management (EM) Office of Clean-up Technology identified twenty-three potential technical projects and then down-selected ten of these for further evaluation. An independent expert peer review was conducted for the ten down-selected proposals. The review panel consisted of twenty-three recognized subject matter experts that broadly represented academia, industry, and federal laboratories. Of the initial ten proposals reviewed, one was given unconditional support, six were given conditional support, and three were not supported as proposed. Three additional proposals were then submitted by DOE for review--these proposals were structured, in part, to respond to the initial round of technical peer review comments. Peer reviews of these additional proposals ...
This phase report summarizes the results of field investigations conducted in 1992 at Technical Area 21 of Los Alamos National Laboratory, as prescribed by the RCRA Facility Investigation work plan for the Technical Area 21 operable unit (also known as OU 1106). This phase report is the last part of a three-part phase report describing the results of field work conducted in 1992 at this operable unit. Phase Report lA, issued on l4 June l993, summarized site geologic characterization activities. Phase report 1B, issued on 28 January 1994, included an assessment of site-wide surface soil background, airborne emissions deposition, and contamination in the locations of two former air filtration buildings. The investigations assessed in Phase Report 1C include field radiation surveys and surface and near-surface sampling to characterize potential contamination at 25 outfalls and septic systems listed as SWMUs in the RFI work ...
This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Idaho National Engineering Laboratory (INEL) and Component Development and Integration Facility (CDIF), conducted September 14 through October 2, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the INEL and CDIF. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the ...
The Fermilab Steering Group has developed a plan to keep U.S. accelerator-based particle physics on the pathway to discovery, both at the Terascale with the LHC and the ILC and in the domain of neutrinos and precision physics with a high-intensity accelerator. The plan puts discovering Terascale physics with the LHC and the ILC as Fermilab's highest priority. While supporting ILC development, the plan creates opportunities for exciting science at the intensity frontier. If the ILC remains near the Global Design Effort's technically driven timeline, Fermilab would continue neutrino science with the NOVA experiment, using the NuMI (Neutrinos at the Main Injector) proton plan, scheduled to begin operating in 2011. If ILC construction must wait somewhat longer, Fermilab's plan proposes SNuMI, an upgrade of NuMI to create a more powerful neutrino beam. If the ...
Aqueous solutions (mixed waste) generated from various LLNL operations, such as debris washing, sample preparation and analysis, and equipment maintenance and cleanout, were combined for storage in the B695 tank farm. Prior to combination the individual waste streams had different codes depending on the particular generating process and waste characteristics. The largest streams were CWC 132, 791, 134, 792. Several smaller waste streams were also included. This combined waste stream was treated at LLNL's waste treatment facility using a vacuum filtration and cool vapor evaporation process in preparation for discharge to sanitary sewer. Prior to discharge, the treated waste stream was sampled and the results were reviewed by LLNL's water monitoring specialists. The treated solution was discharged following confirmation that it met the discharge criteria. A major source, accounting for 50% for this waste stream, is metal machining, cutting and ...
This paper reports that some regions have prepared for these days of disposal shortage with comprehensive waste plans that include a strong WTE presence. Witness Broward County, Florida's program, 12 years in planning by public and private entities, Broward is the second most populated county in the state, with 1.3 million residents and a heavy tourist population, which, together, produce 1.6 million tons of waste annually. The disposal program includes Waste Management, Inc.'s expansion of a 400-acre Central Disposal Sanitary Landfill, the county's new 588-acre landfill, composting, and curbside pickup for recyclables. And, this south Florida plan would not be complete without the two brand new combustion plants. Clean Air and Water Acts notwithstanding, the Florida Department of Environmental Regulation can induce standards stricter than the federal government's due to the sensitive ...
In November 1995, the Australian and New Zealand Environment and Conservation Council (ANZECC, the Council of State and National Environment Ministers) adopted a National Management Plan for PCBs. This was a significant milestone in the very long saga of Australian efforts to develop public policy and management structures for dealing with persistent organochlorine wastes. The author was part of a four-person consultation panel that carried out a public involvement program to assist and inform the process of developing the National Management Plan. The program involved, among other things, visiting every state and territory of Australia at least twice. This paper describes the development and delivery of the public involvement program, including ongoing interactions with Governments. The latter is often a complex (and many would say an unduly complex) matter in the federal system, where primary responsibility for waste management resides in the ...
This document presents a conceptual design for a contingency interim measure (IM) for treatment of the public water supply system at Barnes, Kansas, should this become necessary. The aquifer that serves the public water supply system at Barnes has been affected by trace to low concentrations of carbon tetrachloride and its degradation product, chloroform. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory (Argonne 2008a) have demonstrated that groundwater at the Barnes site is contaminated with carbon tetrachloride at concentrations exceeding the Kansas Tier 2 risk-based screening level (RBSL) and the EPA maximum contaminant level (MCL) of 5.0 {micro}g/L for this compound. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) formerly operated a grain storage facility in Barnes, approximately 800 ft east-southeast of the public water supply wells. Carbon tetrachloride was used in the treatment of grain. ...
Total EU (and Norway) emissions of CO_2 from thermal power generation were some 950 million tonnes in 1990, the Kyoto agreement reference level. An ongoing research project, the GESTCO project, will provide the first documentation that, for the emission sources within the selected key areas, sufficient geological storage capacity is available for at least 30 years and possibly much longer. Cost of energy will obviously increase, but it is anticipated that electricity production cost price will be comparable to that of renewables. It would further have major implications for the European power generating industry which today is totally dominated by fossil fuel combustion with enormous emissions problems. The identification and siting of subsurface CO_2 storage capability can be expected to have considerable effect on the planning for and future siting of fossil fuel plants. In Norway there are plans to build several major, coastally sited, ...
For the construction of underground facilities comprising access tunnels, connecting tunnels, main tunnels and disposal tunnels, a large number of tunnels will be excavated in deep rock formations. These excavations will extend hundreds kilometers in total length. Therefore, special attention must be paid, to transporting large volume of debris, ventilation, emergency escape routes in case of accident, and other factors. In addition, special attention must also paid to potential accidents which might in underground excavations, including unstable facing phenomena (such as collapse and swelling of facing at weak layer sections), spring water flow resulting collapse of rock, gas eruption, and rock burst. While considering these factors to be emphasized during the construction of geological disposal facilities, the investigation reviewed the existing working methods on individual construction technologies of access tunnels, main tunnels, ...
For the construction of underground facilities comprising access tunnels, connecting tunnels, main tunnels and disposal tunnels, a large number of tunnels will be excavated in deep rock formations. These excavations will extend hundreds kilometers in total length. Therefore, special attention must be paid, to transporting large volume of debris, ventilation, emergency escape routes in case of accident, and other factors. In addition, special attention must also paid to potential accidents which might in underground excavations, including unstable facing phenomena (such as collapse and swelling of facing at weak layer sections), spring water flow resulting collapse of rock, gas eruption, and rock burst. While considering these factors to be emphasized during the construction of geological disposal facilities, the investigation reviewed the existing working methods on individual construction technologies of access tunnels, main tunnels, ...
North Carolina is in the process of siting a LLRW disposal facility as the next host state for the Southwest Compact. After two years of site characterization studies at two technically challenging sites, the LLRW Management Authority (the Authority), will submit a license application for the preferred site. One potential site is in unconsolidated Tertiary and Cretaceous deposits of the inner Coastal Plain, the other in fractured sedimentary rocks of the Triassic Deep River Basin. Involved since 1986, the North Carolina Geological Survey (NCGS) provides technical advice to the Division of radiation Protection, the state regulatory agency authorized to approve or deny a license. With the multi-million dollar project behind schedule, and millions of dollars over budget, in February 1992 the Southeast Compact Commission established three project milestones (1) submit license application by December 31, 1993; (2) approve license by March 15, 1994; (3) open ...
This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.
The effect of mean stress, or the stress ratio (R), on the fatigue-crack growth (FCG) behavior of #alpha#-aged and #omega#-aged microstructures of the beta titanium alloy Ti-10V-2Fe-3Al was investigated. While the mean stress had a negligible effect on the FCG behavior of the #alpha#-aged microstructure, a strong effect was observed in the #omega#-aged microstructure. In particular, the values of the threshold stress-intensity range (#DELTA#K_t_h) exhibited a strong dependence on R in the #omega#-aged microstructure, while this dependence was weak in the #alpha#-aged microstructure. These effects seem to arise primarily from fracture-surface roughness-induced crack closure. The crack closure levels for the #alpha#-aged microstructure were found to be very low compared to those for the #omega#-aged microstructure. Transmission electron microscopy and scanning electron microscopy studies of microstructures and fracture surfaces were performed to ...
The South White Rose oilfield, offshore Newfoundland, owned jointly by Husky Oil (82.5 per cent ) and Petro-Canada (17.5 per cent) is being developed using a floating production storage and offloading (FPSO) system. Some industry stakeholders claim that the oil should be produced using a concrete gravity base system as used in the Hibernia Field. However, Husky Oil officials are confident that the choice of the FPSO is well justified, based on its cost effectiveness and economic viability. Several production facility options have been assessed, taking into account feasibility, deliverability, economic attributes. risk and safety . The assessment results clearly pointed to FPSO as the preferred system based on its commercial and technical flexibility, proven track record in harsh environments, its ability to produce both oil and gas in sequential development, its promise of production at full capacity earlier than a gravity base system, and easier decommissioning ...
...2010-10-01 false Information technology security plan and accreditation...Clauses 1252.239-71 Information technology security plan and accreditation...following provision: Information Technology Security Plan and...
LEDF(Large Equipment Dismantling Facility) is the solid waste processing technology development facility that carries out high-volume reduction and low dosage processing. The high-volume reduction processing of the high dose {alpha}-waste configured with combustible waste, pvc and rubber, spent ion exchange resin, and noncombustible waste have been planned the incinerating and melting facility using the in-can type high frequency induction heating in LEDF. This test is intended to clarify the design data. It was confirmed that the incinerating and melting performance, molten solid properties and exhaust gas processing performance with pilot testing equipment and bench scale equipment. The result of this test are as follows. 1. Processing speed is 6.7 kg/h for the combustible waste, 13.0 kg/h for the ion exchange resin, and 30.0 kg/h for the noncombustible waste. For above optimum processing conditions ...
A method is proposed for evaluating reliability of planning and calculation of the reliability factor with current planning of open pit mining operations. For a quantitative evaluation of the reliability of fulfilling the planned assignment, laws were defined for distribution of the quality characteristics of the coal. After establishing that coal ash content follows the normal distribution law, the probability was defined that the actual output of coal is greater or equal to the planned. Calculation of the factor of reliability of the current planning of open mining operations makes it possible to determine the optimum planning for this period and the probability of fulfillment of the planned assignments. The technique of planning with regard for reliability makes it possible to select the most reliable variant of the ...
The probability of damage and the potential resulting hazards are analyzed for a representative rail shipping container for three severe rail accident scenarios. The scenarios are: (1) the rupture of closure bolts and resulting opening of closure lid due to a severe impact, (2) the puncture of container by an impacting rail-car coupler, and (3) the yielding of container due to side impact on a rigid uneven surface. The analysis results indicate that scenario 2 is a physically unreasonable event while the probabilities of a significant loss of containment in scenarios 1 and 3 are extremely small. Before assessing the potential risk for the last two scenarios, the uncertainties in predicting complex phenomena for rare, high- consequence hazards needs to be addressed using a rigorous methodology.
Objectives To present our preliminary experience with laparoscopic groin exploration and subsequent laparoscopic orchiectomy and internal ring closure for testicular nubbin in children and discuss the usefulness of our new treatment strategy. The advantages of laparoscopic orchiopexy for intra-abdominal testis are the ability to start treatment as soon as a diagnosis has been made and to permit minimally invasive surgery. These advantages can apply to laparoscopic orchiectomy for a testicular nubbin. Methods A total of 6 boys with a testicular nubbin (age range 14-76 months, mean age 27.3 months) underwent laparoscopic orchiectomy at our institution from June 2007 to June 2008. We opened the posterior parietal peritoneum by incising the peritoneum lateral to the spermatic vessel, distal to...
The required minimum 30-year post-closure care period for municipal solid waste (MSW) landfills can be shortened by reducing or eliminating of MSW components with long-terms effect in gas and leachate. The objectives of this study were to evaluate the relative persistence of landfill gas, leachate quantity, and selected leachate parameters using post-closure monitoring data from a case study landfill in south Florida. The relative persistence of selected decomposition byproducts in leachate were evaluated by both zero order and first order models based on monitoring data from the case study landfill. The analyses show that although gas and leachate production rates diminish very quickly, some contaminants remain in leachate as the decomposition process continues at a slower rate. For the c...
The experimental study of the proton-rich nuclei close to the N=Z line is a constant challenge for nuclear spectroscopy, mainly due to the difficulty to produce them with the currently available beam/target combinations. Significant advances on this direction were obtained from experiments performed with the GASP array during the last two years: the yrast line of {sup 84}Mo was extended up to 10{sup +}, {sup 88}Ru observed for the first time, and the N=Z+1 line was mapped from {sup 81}Zr to {sup 95}Ag. These new results allow us to have a more complete image of the transition from the well-deformed shell closure at N,Z=40 to the spherical-shell closure at N,Z=50, and highlights some particular effects that can be observed only in the vicinity of the N=Z line. (orig.)
The experimental study of the proton-rich nuclei close to the N=Z line is a constant challenge for nuclear spectroscopy, mainly due to the difficulty to produce them with the currently available beam/target combinations. Significant advances on this direction were obtained from experiments performed with the GASP array during the last two years: the yrast line of "8"4Mo was extended up to 10"+, "8"8Ru observed for the first time, and the N=Z+1 line was mapped from "8"1Zr to "9"5Ag. These new results allow us to have a more complete image of the transition from the well-deformed shell closure at N,Z=40 to the spherical-shell closure at N,Z=50, and highlights some particular effects that can be observed only in the vicinity of the N=Z line. (orig.)
The YGN Units 3 and 4 plant conditions during shutdown operation were reviewed to identify the possible event scenarios following the loss of shutdown cooling. The thermal hydraulic analyses were performed for the five cases of RCS configurations under the worst event scenario, unavailable secondary cooling and no RCS inventory makeup, using the RELAP5/MOD3.2 code to investigate the plant behavior. From the analyses results, times to boil, times to core uncovery and times to core heat up were estimated to determine the containment closure time to prevent the uncontrolled release of fission products to atmosphere. These data provide useful information to the abnormal procedure to cope with the event. 6 refs., 7 figs., 2 tabs. (Author)
This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.
Full text: This presentation will review the progress achieved so far by the Irish national regulatory agency, the Radiological Protection Institut e of Ireland (R.P.I.I.) in the investigation of work activities where the presence of natural radiation sources (NORM) could lead to a significant increase in exposure to workers or members of the public which cannot be disregarded from the radiation protection point of view. Since the coming into force in Ma y 2000 of the Radiological Protection Act, 1991 (Ionising Radiation) Order, 2000 (S.I. No. 125 of 2000) which implements the Eu B.S.S. Directive 96/29/EURATOM, four major NORM industries currently active in Ireland have been investigated. According to the literature, they are all considered liable to involve work practices resulting in exposure to NORM. They include: the gas extraction and production industry, the peat- and coal-firing power generation industry and the bauxite/alumina refining industry. For the gas industry, monitoring ...
This paper reports on the Burning Plasma Experiment (BPX) which when operating at a toroidal field of 8.1 tesla and a plasma current of 10.6 megamps, requires peak power of 1235 megawatts and total pulse energy of over 21 gigajoules. These requirements are twice and over four times the corresponding figures for the Tokamak Fusion Test Reactor (TFTR), respectively. The design of the BPX power system has evolved, along with the tokamak, over a period of several years and has included studies of several alternative approaches. The reapplication of the existing TFTR power and energy facilities has been basic to all approaches. Among the new sources of pulse power and energy that have been considered are: direct utility grid pulsing, new flywheel units, and lead-acid storage batteries. The toroidal field power requirements are the greatest of the BPX subsystems and, fortunately, are sufficiently free of dynamics to allow the consideration of all approaches. Additional ...
Data which have been collected by Los Alamos National Laboratory waste management for the hydrologic characterization of the subsurface at the low level radioactive waste disposal facility, Area G, are reported and discussed briefly. The data includes Unsaturated Flow Apparatus measurements of the unsaturated conductivity in samples from borehole G-5. Analysis compares these values to the predictions from van Genuchten estimates, and the implications for transport and data matching are discussed, especially at the location of the Vapor Phase Notch (VPN). There, evaporation drives a significant vapor flux and the liquid flux cannot be measured accurately by the UFA device. Data also include hydrologic characterization of samples from borehole G-5, Area G surface soils, Los Alamos (Cerros de Rio) basalt, Tsankawi and Cerro-Toledo layers, the Vapor Phase Notch (VPN), and additional new samples from the uppermost tuff layer at Area G. Hydraulic properties from these ...
The Synchrotron Resource of the Howard Hughes Medical Institute will be dedicated to structural analyses of biological macromolecules, primarily through crystallography. This facility is under construction at the X4 port of the National Synchrotron Light Source at Brookhaven National Laboratory, and it will comprise three beamlines. The first line to be built has been devised to apply the multiwavelength anomalous diffraction method which provides direct estimates for the phases of reflections. The second line will be devoted to rapid and essentially routine diffraction measurements, mainly through the rotation method. These two experimental stations are contained within refrigerated radiation enclosures that will maintain clean environments, narrowly defined constant temperatures, and protection against biohazard at biosafety level BL-2. At the same time as the second line will be developed, the swath center is planned to first serve as a ...
The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been constructed to be a repository for transuranic (TRU) radioactive wastes generated from the US defense activities. In order to use WIPP as a repository for permanent disposal of TRU waste, the US Department of Energy (DOE) has to demonstrate compliance with the Standards for the Management and Disposal of Spent Nuclear Fuel, High Level and Transuranic Radioactive Wastes'' promulgated by the US Environmental Protection Agency (EPA) in the US Code of Federal Regulations 40 CFR Part 191. The DOE initially plans to perform experiments with a small quantity of waste at WIPP and would like to bring additional quantities for operational demonstration'', before determining whether WIPP is to be a repository for permanent disposal. There are serious problems in pursuing this course of action from an operational point of view. It would be wiser to take the ...
During the past 2 yr, significant progress has been made in several areas related to the safety and environmental (S and E) aspects of inertial fusion energy (IFE). An updated methodology has been developed, and accident analyses have been performed for two IFE conceptual power plants and a target fabrication facility. Parallel to the consequence analyses of different accident scenarios, ongoing studies of accident initiating events are being used to support safety assessment and create a basic framework of types of events to consider in future risk characterization of new plant designs. Target designers/fabrication specialists have been provided with ranking information related to the S and E characteristics of candidate target materials. We have revisited waste management options for IFE, introducing the concept of clearance versus the traditional shallow land burial. A brief summary of results in each of these activities is given, and plans ...
The Department of Energy`s program for disposing of nuclear High-Level Waste (HLW) and transuranic (TRU) waste has been impeded by overwhelming political opposition fueled by public perceptions of actual risk. Analysis of these perceptions shows them to be deeply rooted in images of fear and dread that have been present since the discovery of radioactivity. The development and use of nuclear weapons linked these images to reality and the mishandling of radioactive waste from the nations military weapons facilities has contributed toward creating a state of distrust that cannot be erased quickly or easily. In addition, the analysis indicates that even the highly educated technical community is not well informed on the latest technology involved with nuclear HLW and TRU waste disposal. It is not surprising then, that the general public feels uncomfortable with DOE`s management plans for with nuclear HLW and TRU waste disposal. Postponing the ...
The present article describes the features of the fully-fired combined cycles and the outline of the plant. Hitachi has optimized fully-fired combined cycle systems by executing a heat recovery type combined cycle. For the fully-fired combined cycles, it is possible to raise plant efficiency through the selection of adequate gas turbine types and cycles. It is possible to apply existing boiler facilities, fuel combustion systems, and stacks. It is possible to execute civil and architectural works on existing plants in-service as well as modification works during routine inspections. The NOx increment by gas turbine unit installations can be reduced by denitration plant modifications. Examples of the fully-fired combined cycles under planning are also introduced. Furthermore, the relational technique and operational characteristics are mentioned, as for combustion characteristics under low oxygen concentration in the wind box, NOx emissions on ...
At the 1996 Conference in North Carolina, The Green Institute began to share its story. Their presentation this year will cover where they are in the design process and their plans for using solar and wind technologies in the development of an Eco-Industrial Park and Business Incubator. Located in a Federal Enterprise Community in Minneapolis, this project borrows sustainable and green building principles using the Rocky Mountain Institute and Solar Living Center as models. Using a change in the paradigm regarding how industry does business, The Green Institute is joining with developments across the country that are putting together Eco-Industrial Parks which use closed loop production systems to reduce waste and emissions generated from manufacturing processes. Using renewable energy, both solar and wind, presents challenges both in the integration of systems on this small site and the educational opportunities with a large potential audience outside the ...
Computer based control systems for safety related applications in nuclear power plants have to meet not only the functional, performance and interface requirements, they in addition, have to meet regulatory requirements like enhanced reliability, safety and security and should provide fault tolerance, diagnostics and self-supervision. The control system architecture, hardware design and software design should meet requirements as specified in design code and guides of AERB. The Dual Processor Hot Standby Process Control System (DPHS-PCS) for TAPP-3 and 4 is a safety related (Class- IB) system. DPHS-PCS regulates PHT pressure, Pressuriser pressure, Pressuriser level, Bleed condenser pressure, Bleed condenser level and Steam generator pressure. The performance, reliability and safety requirements of this control system are met by employing a fault tolerant computer configuration developed for this purpose using hardware designed with facility for on-line diagnostics ...
At Tarapur Atomic Power Station 3 and 4, 540 MWe Pressurised Heavy Water Reactors, core being large in size requires a continuous in core monitoring for local flux disturbances. Nearly 200 Self Powered Neutron Detectors (SPNDs) of the Straight Individually Replaceable (SIR) type are distributed in the reactor core. For purpose of reactor regulation and protection, cobalt SPNDs that have a prompt response for changes in power is used for in-core flux mapping, vanadium SPNDs that provide accurate measure of neutron flux, even though having slow response is used In core SPNDs are placed in Vertical Flux Units (VFU) and Horizontal Flux Units (HFUs). These SPNDs were to be replaced at regular intervals to meet the design intent. Cobalt SPNDs have dose rates of the order of 1000 Gy/h and the Mineral Insulated (MI) cables of Vanadium SPNDs have dose rates of the order of 100 Gy/h. So far 3 Cobalt SPNDs were removed from HFUs and are being stored in lead shielding inside spent fuel storage ...
It is generally recognized that the Remedial Investigation/Feasibility Study (RI/FS) process can be time-consuming and costly. To expedite the process, the Environmental Protection Agency, through the National Contingency Plan and Office of Solid Waste and Emergency Response (OSWER) Directives, has promoted streamlining'' the RI/FS. The concept of streamlining is directly applicable to Resource Conservation and Recovery Act (RCRA) Remedial Facility Investigation/Corrective Measure Study (RFI/CMS) as well. The US Department of Energy's (DOE's) environmental restoration process promises to be lengthy and expensive: therefore, the Office of Environmental Restoration (EM-40) believes that it is to incorporate streamlining into RI/FS and RFI/CMS efforts across the DOE complex. The Office of Program Support (EM-43) has asked Pacific Northwest Laboratory (PNL) to provide presentations and workshops on streamlining ...
The ability to monitor the corrosion degradation of key components in fossil fuel power plants is of utmost importance for Futuregen and ultra-supercritical power plants. Fireside corrosion occurs in the high temperature sections of energy production facilities due to a number of factors: ash deposition, coal composition, thermal gradients, and low NOx conditions, among others. Problems occur when equipment designed for either oxidizing or reducing conditions is exposed to alternating oxidizing and reducing conditions. This can happen especially near the burners. The use of low NOx burners is becoming more commonplace and can produce reducing environments that accelerate corrosion. One method of addressing corrosion of these surfaces is the use of corrosion probes to monitor when process changes cause corrosive conditions. In such a case, corrosion rate could become a process control variable that directs the operation of a coal combustion or coal gasification ...
The National Spallation Neutron Source (NSNS), in which neutrons are generated by bombarding a liquid mercury target with 1 GeV protons, will place extraordinary demands on materials performance. The target structural material will operate in an aggressive environment, subject to intense fluxes of high energy protons, neutrons, and other particles, while exposed to liquid mercury and to water. Components that require special consideration include the Hg liquid target container and protective shroud, beam windows, support structures, moderator containers, and beam tubes. In response to these demands a materials R and D program has been developed for the NSNS that includes: selection of materials; calculations of radiation damage; irradiations, post irradiation testing, and characterization; compatibility testing and characterization; design and implementation of a plan for monitoring of materials performance in service; and materials engineering and technical ...
A $200 million paper mill being built in Hagerstown, Md., is expected to produce 150,000 bone-dry short tons per year of de-inked, market-grade pulp for writing and printing paper. The 1st Urban Fibers facility, the largest capital project in Hagerstown's history, is slated for completion in the spring. Landegger Recycled Fiber Corp. will operate and maintain the 200,000-square-foot recycling mill and 60,000-square-foot water reclamation plant. The wastepaper recycling mill plans to minimize waste and pollution by: reclaiming 635 tons per day of 100 percent post-consumer mixed office waste from the solid waste stream; saving more than 16 million cubic feet of landfill area per year; conserving the fiber equivalent of 6,700 trees per day; using no chlorine; saving about 2,000 gallons of water and 4,000 kilowatt hours of electricity per ton of throughput, compared to virgin fiber mills; reusing treated wastewater, reducing effluent ...
This is the eighth part of a ten-part final report for the Swiss Federal Office of Energy (SFOE) on a project that looked into potential problems relating to the Swiss electricity distribution grid with respect to the increasing number of distributed power generation facilities being put into service. The identification of special conditions for the grid's operation and future development that take increasing decentralised power production into account are discussed. The results of the project activities encompass the analysis and evaluation of various problem areas associated with planning and management of the grid during normal operation and periods of malfunction, as well as required modifications to safety systems and grid configurations. This seventh appendix to the main report summarises and discusses the knowledge gained during the project and attempts to provide answers to various questions posed by the use of distributed ...
The key to improving transmission-network security is faster response to contingencies. Now a new breed of pumped-storage plant - designed for ultra-fast response - may soon provide a tool dispatchers can use to improve network security. This type of plant can also substantially increase the effective capacity of existing transmission lines and improve the performance of thermal generating units. The Mt. Hope Waterpower Project, planned for Rockaway Township, NJ, 35 miles west of New York City, lies strategically adjacent to major load centers at the eastern end of the PJM control area and near the interconnection point with the New York Power Pool (NYPP). This location also is in an area deficient in significant generating facilities. Maximum design capacity of the project is 2000 MW, provided by six reversible pump/turbines, each with a nominal 340-MW rating. The upper reservoir, with a surface area of only 60 acres, provides 5000 acre-ft of ...
We compare the physics potential of the upcoming neutrino oscillation experiments Daya Bay, Double Chooz, NOvA, RENO, and T2K based on their anticipated nominal luminosities and schedules. After discussing the sensitivity to theta_{13} and the leading atmospheric parameters, we demonstrate that leptonic CP violation will hardly be measurable without upgrades of the T2K and NOvA proton drivers, even if theta_{13} is large. In the presence of the proton drivers, the fast track to hints for CP violation requires communication between the T2K and NOvA collaborations in terms of a mutual synchronization of their neutrino-antineutrino run plans. Even in that case, upgrades will only discover CP violation in a relatively small part of the parameter space at the 3 sigma confidence level, while 90% confidence level hints will most likely be obtained. Therefore, we conclude that a new facility will be required if the goal is to obtain a significant ...
This document defines the quality assurance requirements for the US Department of Energy-Richland Operations Office Environmental Restoration Remedial Action program at the Hanford Site. The Environmental Restoration Remedial Action program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. This document combines quality assurance requirements from various source documents into one set of requirements for use by the US Department of Energy-Richland Operations Office and other Environmental Restoration Remedial Action program participants. This document will serve as the basis for developing Quality Assurance Program Plans and implementing procedures by the participants. The requirements of this document will be applied to activities affecting quality, using a ...
One of the issues identified in the US Nuclear Regulatory Commission`s Nuclear Plant Aging Research program plan is the need to understand the state of ``mothballed`` or other out-of-service equipment to ensure subsequent safe operation. Programs for proper storage and preservation of materials and components are required by NRC regulations (10 CFR 50, Appendix B). However, materials and components have been seriously degraded due to improper storage, protection, or layup, at facilities under construction as well as those with operating licenses. Pacific Northwest Laboratory has evaluated management of aging for unstarted or mothballed nuclear power plants. The investigations revealed that no uniform guidance in the industry addresses reactor layup. In each case investigated, layup was not initiated in a timely manner, primarily because of schedule uncertainty. Hence, it is reasonable to assume that this delay resulted in accelerated aging of ...
With the recent advance of the utilization of nuclear energy in a large scale, social interest is being focussed in the potential risk which the nuclear technology will accompany. Especially after the accidents in Chernobyl and other nuclear facilities, serious anxiety to the utilization of nuclear energy is prevailing among the general public. In order to meet the anxiety and distrust of the population in the use of the nuclear power, the health effect or risk which radioactive materials released into the environment will bring about should be comprehensively and properly evaluated, and then should be widely reported to the population. The development of HESANS code system (Health and Environmental Safety Assessment Network System) was planned to set up such a comprehensive computer code that covers a whole pathway of radioactive material from its release to estimates of derived health effects in the population, including the countermeasures ...
Concerns over the environment and energy security have recently prompted renewed interest in the U.S. in nuclear energy. Recognizing this, the U.S. Dept. of Energy has launched an initiative to revamp and modernize the role that modeling and simulation plays in the development and operation of nuclear facilities. This Nuclear Energy Advanced Modeling and Simulation (NEAMS) program represents a major investment in the development of new software, with one or more large multi-scale multi-physics capabilities in each of four technical areas associated with the nuclear fuel cycle, as well as additional supporting developments. In conjunction with this, we are designing a software architecture, computational environment, and component framework to integrate the NEAMS technical capabilities and make them more accessible to users. In this report of work very much in progress, we lay out the 'problem' we are addressing, describe the model-driven system ...
The newly developed techniques by the Hot Laboratory (JMTR HL) have provided for us the key information on behavior of specimens due to mechanical / physical / chemical / synergistic effects of radiation, stress and water for fission and fusion reactor environment. These techniques are focused on several topics as follows; (1) miniaturized specimen test for the development of fusion reactor materials, (2) slow strain rate tensile testing (SSRT) and crack propagation measuring tests for the study of Irradiation Assisted Stress Corrosion Cracking (IASCC) of core internals of LWR, (3) handling technique on specimens including tritium for the research and development of tritium breeders and neutron multiplier as fusion blanket materials, (4) joining method using the Tungsten Inert Gas (TIG) welding technique for re-assembling of capsule and re-fabrication of specimen and (5) nondestructive evaluation using ultrasonic wave and infrared thermography for the quantitative evaluation of ...
R and D today is a large industry that consumes vast amounts of public and private funds in most countries. It is becoming increasingly evident that technology transfer and the commercialization of research done at universities and government funded research laboratories must be a key element of their comprehensive strategic plan. It involves using a verified and organized knowledge and research to develop commercially viable products. It requires a visionary leader with effective project management skills to manage and motivate a team of scientists and engineers, otherwise even a top rated researcher will enervate and wither within the walls of research laboratories. This paper will highlight the importance, challenges and techniques of commercializing technology from accelerator research laboratories. It will provide an overview of the requirements of scientific leadership for both commercialization of research and technology, together with some case studies ...
Factors important in choosing between process concepts were mechanical complexity and amenability to scale-up studies. The culmination of this work was a process concept known as Staged Turbulent Bed Retorting Process (STB), which has now been tested in pilot plants. Operating conditions are described. The environment in the retort section can be described as a staged, moving bed of particles, in which a portion of the particles are fluidized at gas velocities well below minimum fluidization velocity of many of the particles. Research and engineering evaluations have established that the STB provides prospects for the responsible development of oil shale resources on a commercial scale. A 320 ton/d semiworks unit, the next technological step, will be commissioned shortly. This unit will be large enough to provide scale-up data for design of modules and to demonstrate the entire process, generating data needed to optimize, design, and construct commercial oil shale ...
In October 1980, Air Products and Chemicals, Inc. began a three year contract with the DOE: Catalyst and Reactor Development for a Liquid Phase Fischer-Tropsch Process. The program contains four major tasks: (1) Project Work Plan, (2) Slurry Catalyst Development, (3) Slurry Reactor Design Studies, and (4) Pilot Facility Design. This report describes work on Tasks 2 and 3 carried out in the third quarter of the contract. In Task 2, the computerized search of the Fischer-Tropsch literature was continued, and improvements were made in data processing programs. Shakedown tests were completed on the first 300 ml slurry reactor, and construction of the second and third reactors began. Five modified conventional slurry catalysts were prepared, and two batches were tested in the gas phase giving information on selectivity as a function of composition and activation. Four supported cluster catalyst were synthesized, and seven were tested in the gas ...
The Magnet Test Facility at Fermilab tests a variety of full-scale and model superconducting magnets for both R and D and production. As the design characteristics and test requirements of these magnets vary widely, the magnet test stand must accommodate a wide range of Data Acquisition (DAQ) and Control requirements. Such a system must provide several functions, which includes: quench detection, quench protection, power supply control, quench characterization, and slow DAQ of temperature, mechanical strain gauge, liquid helium level, etc. The system must also provide cryogenic valve control, process instrumentation monitoring, and process interlock logic associated with the test stand. A DAQ and Control system architecture that provides the functionality described above has been designed, fabricated, and put into operation. This system utilizes a modular approach that provides both extensibility and flexibility. As a result, the complexity of the hardware is ...
A reactor-neutrino experiment, Daya Bay, has been proposed to determine the least-known neutrino mixing angle theta_13 using electron antineutrinos produced at the Daya Bay nuclear power complex in China. Daya Bay is an international collaboration with institutions from China, the United States, the Czech Republic, Hong Kong, Russia, and Taiwan. The experiment will use eight identical detectors deployed at three different locations optimized for monitoring the antineutrino rates from the six reactors and for detecting any rate deficit and spectral distortion near the first oscillation maximum. The overburden of the under ground experimental halls, connected with tunnels, ranges from about 250 to 900 meters-water-equivalent so that the cosmogenic background is small compared to the number of observed antineutrino events. Civil construction of tunnels and experimental facilities is planned to start in 2007, with detector construction beginning in ...
In this work an analysis of the influence of the choice of the algorithm or planning system, on the calculus of the same treatment plan is introduced. For this purpose specific software has been developed for comparing plans of a series of IMRT cases of prostate and head and neck cancer calculated using the convolution, superposition and fast superposition algorithms implemented in the XiO 4.40 planning system (CMS). It has also been used for the comparison of the same treatment plan for lung pathology calculated in XiO with the mentioned algorithms, and calculated in the Plan 4.1 planning system (Brainlab) using its pencil beam algorithm. Differences in dose among the treatment plans have been quantified using a set of metrics. The recommendation for the dosimetrist of a careful choice of the algorithm has been ...
About 25 years after the last edification of a new large high voltage institute at Technical University of Karlsruhe and about 10 years afte the edification of the test lab at Kaiserslautern University, the Brandenburg Technical University of Cottbus had the opportunity to design new high voltage test facilities from the very beginning on and to realize it in a very short time. To review the project from the first ideas followed by the planning and realization phase and the final commissioning of the technical equipment, this book should be a contribution to spred the experiences made among interested people and to demonstrate the actual technical possibilities. To ensure an international exchange of these experiences, all co-authors to the trouble to translate their participation's also to the English language. (orig.) [German] Etwa 25 Jahre nach dem letzten grossen hochspannungstechnischen Institutsneubau in der deutschen ...
The implementation of a three-dimensional conformal radiotherapy facility in the radiotherapy department of the Heinrich Heine University is described. Complex radiotherapy techniques with commercially available networked systems are introduced to improve clinical work. Over 18 month we have gained clinical experience with a PHILIPS Multileaf Collimator (MLC) mounted on a SL 25 linear accelerator. For a limited period the MLC was used as a conventional blocking device. The standard MLC-shapes are controlled with a stand-alone computer system. In addition, a three-dimensional treatment planning system (3-D-TPS / TMS-Radix, Helax AB) based on convolution/superposition algorithms was recently installed. Treatment optimization is achieved using static field arrangements with complete volumetric computerized tomographic patient data for 3-D-TPS. Conformal adaptation of the 95%-isodose to the Planning Target Volume (PTV, ICRU 50) ...
This report presents the Business Plan for the establishment of the Wind Turbine Component Centre (CWTC) to meet the objectives of performing theoretical research and experimental testing. The core idea of a CWTC is to support the Danish wind energy industry and research activities at the component level improving the competitive advantage of that industry. The CWTC will in itself operate its activities, including access to test and experimental facilities, on a semi commercial basis. The business model for the CWTC presented is based on revenues coming from component manufacturers as well as research grants, and will include membership fees as well as hourly payment and larger projects where payment is a limited project sum. The presented roadmap model clarifies the development path towards a fully developed CWTC, which will cover test of all important components along the drive-train as well as offering a comprehensive systematic ...
The PIUS reactor utilizes simplified, inherent, passive, or other innovative means to accomplish safety functions. Accordingly, the PIUS reactor is subject to the requirements of 10CFR52.47(b)(2)(i)(A). This regulation requires that the applicant adequately demonstrate the performance of each safety feature, interdependent effects among the safety features, and a sufficient data base on the safety features of the design to assess the analytical tools used for safety analysis. Los Alamos has assessed the quality and completeness of the existing and planned data bases used by Asea Brown Boveri to validate its safety analysis codes and other relevant data bases. Only a limited data base of separate effect and integral tests exist at present. This data base is not adequate to fulfill the requirements of 10CFR52.47(b)(2)(i)(A). Asea Brown Boveri has stated that it plans to conduct more separate effect and integral test programs. If appropriately ...
The constancy in excitation energy of the lowest 2/sup +/ state in the Sr isotopes across the N=56 subshell closure is shown to result from a reduction in the 2psub(1/2)-2psub(3/2) proton spin-orbit splitting as the 2dsub(5/2) neutron orbital is filled.
This paper reports the results of in situ observation of fatigue crack growth in a ferrite?pearlite steel. Stress intensity factor range (?K) decreasing/increasing and constant-?K fatigue tests have been carried out. In banded pearlite orientation, intense crack branching was observed which leads to fatigue crack retardation. Crack closure during the test was monitored to understand the fatigue crack growth behaviour.
A model of heterogeneous mechanism of nucleation on impurity particles in a fluid volume is proposed. The particle spectrum is reproduced by solving the ''inverse'' problems on stationary outflow of a boiling parahydrogen with the use of experimental data of authors. A relation for a closure of the equation system describing a non-equilibrium outflow is obtained. It is shown that within the investigated parameter range one manages to calculate the characteristics of a stationary outflow with a satisfactory accuracy.
To meet growth in the fast developing Pearl River Delta economic zone in China`s Guangdong province, a 270 MW oil-fired combined cycle at Foshan was built and commissioned in only 22 months from financial closure. This article describes the Foshan power station, specifications, design, procurement, construction and operating concerns. 5 figs.
To reduce the number of regular break-ins on CERN machines due to passwords exposed on the network in clear text, OFF-SITE FTP ACCESS TO CERN WILL BE BLOCKED in the CERN firewall from: Tuesday 20th January 2004 If you use ftp to access CERN computers from outside CERN then please see the link below for alternative access means and further advice: http://cern.ch/security/ftp Denise Heagerty, CERN Computer Security officer, Computer.Security@cern.ch
To reduce the number of regular break-ins on CERN machines due to passwords exposed on the network in clear text, OFF-SITE FTP ACCESS TO CERN WILL BE BLOCKED in the CERN firewall from: Tuesday 20th January 2004 If you use ftp to access CERN computers from outside CERN then please see the link below for alternative access means and further advice: http://cern.ch/security/ftp Denise Heagerty, CERN Computer Security officer, Computer.Security@cern.ch
Motor proteins couple steps in ATP binding and hydrolysis to conformational switching both in and remote from the active site. In our kinesin·AMPPPNP crystal structure, closure of the active...Full Text Available
The recently completed ''Deep River Study, Lower Mississippi River'' sponsored by the ''Governor's Task Force on Deep-Draft Vessel Access to the Lower Mississippi River'' contained the following recommended program: Dredge the present 40 foot deep channel to 45 feet initially from the Gulf via Southwest Pass to Mile 172 AHP to provide for two-way navigation of the deep draft vessels that would serve the forecasted most likely level of waterborne commerce (Alternative 9). Plan and seek authorization to further deepen the channel in stages to 55 feet in the future should actual increases in commerce equal the high level level of commerce (Alternative 11). Put into operation, as soon as possible, facilities for loading and topping-off grain ships midstream and topping-off coal carriers in the Gulf in order to attract and establish patterns of trade in large ships. The ...
The high voltage/high power DC-cathode power supply for the Gyrotron Test Facility at the Forschungszentrum in Karlsruhe consists of a 12-pulse thyristor star-point-controller, a 130 kV capacitor-bank followed by a tetrode regulator. Originally designed for 80 kV/30 A CW (continous-wave) operation, its operating regime has been extended in line with gyrotron development to pulses of 65 kV/45 A/3 min and more recently to 65 kV/80 A/10 s without any changes to the main load bearing components (thyristors, transformers or power tetrode). This allows testing of gyrotrons in the 0.5 MW (CW), 1 MW (3 min) and 2 MW (10 s) output power range. The paper describes the system, its operation and some critical aspects of the last upgrade, such as the issue of harmonics in the 20 kV distribution mains-grid, the dynamic response of the thyristor-controller and the avoidance of microwave parasitic oscillations in the high power tetrode (a CQK-200-4, developed by ABB, Switzerland ...
This report documents the Mixed Waste Focus Area (MWFA)-sponsored Alternative Technology Workshop held in Salt Lake City, Utah, from January 24--27, 1995. The primary workshop goal was identifying potential applications for emerging technologies within the Options Analysis Team (OAT) ''wise'' configuration. Consistent with the scope of the OAT analysis, the review was limited to the Mixed Low-Level Waste (MLLW) fraction of DOE's mixed waste inventory. The Los Alamos team prepared workshop materials (databases and compilations) to be used as bases for participant review and recommendations. These materials derived from the Mixed Waste Inventory Report (MWIR) data base (May 1994), the Draft Site Treatment Plan (DSTP) data base, and the OAT treatment facility configuration of December 7, 1994. In reviewing workshop results, the reader should note several caveats regarding data limitations. Link-up of the MWIR and DSTP data bases, while ...
Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual ...
It is planned to use the tritium dose model, DCART (Doses from Chronic Atmospheric Releases of Tritium), to reconstruct dose to the hypothetical maximally exposed individual from annual routine releases of tritiated water (HTO) and tritiated hydrogen gas (HT) from all Lawrence Livermore National Laboratory (LLNL) facilities and from the Sandia National (SNL) Laboratory's Tritium Research Laboratory over the last fifty years. DCART has been described in Part 1 of ''Historical Doses From Tritiated Water And Tritiated Hydrogen Gas Released To The Atmosphere from Lawrence Livermore National Laboratory (LLNL)'' (UCRL-TR-205083). This report (Part 2) summarizes information about annual routine releases of tritium from LLNL (and SNL) since 1953. Historical records were used to derive facility-specific annual data (e.g., source terms, dilution factors, ambient air concentrations, ...
In FY-2000, Engineering at Lawrence Livermore National Laboratory faced significant pressures to meet critical project milestones, and immediate demands to facilitate the reassignment of employees as the National Ignition Facility (the 600-TW laser facility being designed and built at Livermore, and one of the largest R&D construction projects in the world) was in the process of re-baselining its plan while executing full-speed its technology development efforts. This drive for change occurred as an unprecedented level of management and program changes were occurring within LLNL. I am pleased to report that we met many key milestones and achieved numerous technological breakthroughs. This report summarizes our efforts to perform feasibility and reduce-to-practice studies, demonstrations, and/or techniques--as structured through our technology centers. Whether using computational engineering to predict how giant ...
The aim was to compare the energy consumption by private and commercial vehicles with that of public transport facilities constituting urban street traffic, and to evaluate the influence of various traffic related plans such as green waves (where cars are able to drive through the town with relatively few accelerations and braking) streets with lower speed limits and special lanes and priorities for buses. The traffic pattern in four Copenhagen streets (Jagtvej, Soelvgade, Bredgade and Strandvejen) were measured and analyzed both in, and not in, the rush hour, and a special model was used to calculate the energy consumption. The model defines degree of acceleration and slow-down and speed when calculating energy consumption with regard to various driving patterns. It also calculates carbon dioxide emission. It was found that energy consumption decreased with increasing driving speed at 10-60 km/h for all vehicles. The case of buses is a little ...
The aim was to compare the energy consumption by private and commercial vehicles with that of public transport facilities constituting urban street traffic, and to evaluate the influence of various traffic related plans such as green waves (where cars are able to drive through the town with relatively few accelerations and braking) streets with lower speed limits and special lanes and priorities for buses. The traffic pattern in four Copenhagen streets (Jagtvej, Soelvgade, Bredgade and Strandvejen) were measured and analyzed both in, and not in, the rush hour, and a special model was used to calculate the energy consumption. The model defines degree of acceleration and slow-down and speed when calculating energy consumption with regard to various driving patterns. It also calculates carbon dioxide emission. It was found that energy consumption decreased with increasing driving speed at 10-60 km/h for all vehicles. The case of buses is a little ...
In the 14 MeV Neutron Laboratory, we have continued the development of a facility that is now the only one of its kind in operation in the United States. We have refined the klystron bunching system described in last year's report to the point that 1.2 nanosecond pulses have been directly measured. We have tested the pulse shape discrimination capability of our primary NE 213 neutron detector. We have converted the RF sweeper section of the beamline to a frequency of 1 MHz to replace the function of the high voltage pulser described in last year's report which proved to be difficult to maintain and unreliable in its operation. We have also overcome several other significant experimental difficulties, including a major problem with a vacuum leak in the main accelerator column. We have completed additional testing to prove the remainder of the generation and measurement systems, but overcoming some of these experimental difficulties has delayed the ...
The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the surety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future non-nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering (D&E) programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC) is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment ...
The Stockpile Stewardship Program (SSP) is a single, highly integrated technical program for maintaining the safety and reliability of the U.S. nuclear stockpile. The SSP uses past nuclear test data along with current and future nonnuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of current facilities and programs along with new experimental facilities and computational enhancements to support these programs. The Advanced Simulation and Computing Program (ASC)1 is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and ...
Key elements in strategic planning in the nonferrous mining industry are discussed. Included are price forecasting, financial planning, government relations, research and development, and exploration. Financial planning is discussed in terms of 1) forecasting of earnings, 2) investment policy and 3) tax planning. Costs of environmental liabilities are expected to have a major impact on the industry. (JMT)
The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.).
This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required.
...false Additional requirements for health plans. 162.925 Section 162.925 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE...925 Additional requirements for health plans. (a) General rules....
Abstract The authors provide a survey of how images are used in radiation therapy to improve the precision of radiation therapy plans, and delivery of radiation treatment. In contrast...Full Text Available
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different ...
Federal regulators were set to vote on a plan to protect deep water corals and other sensitive fish habitats that will likely include a permanent ban on ...
A brief article considers the possible result of the enquiry into Nirex`s plan to build an underground rock laboratory at Sellafield in relation to radioactive waste disposal in the UK. (UK).
In the National Water Plan it is described which measures must be taken to keep the Netherlands safe and livable for future generations and to make use of the chances offered by water.
The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF.
The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF.
This data layer consists of polygons representing harvest area boundaries from Timber Harvest Plans approved by the California Department of Forestry ... ...
Full text: The ITWG was first formed in 1995 for the purpose of fostering international cooperation for combating illicit trafficking of nuclear materials. The initial focus for the ITWG was on the development of nuclear forensics to help answer attribution questions regarding nuclear materials of unknown origin. More recently, the ITWG has also expanded its focus to include detection of nuclear materials during transit. This paper presents some of the key developments by this group and their potential impact for combating nuclear smuggling. The initial focus of the ITWG was to write a status report on international cooperation on nuclear smuggling forensic analysis. This 26-page report summarized previous work on nuclear forensics and gave an initial analysis on prioritizing techniques and methods for forensic analysis regarding source and route attribution. This report was submitted to the G-8 countries, and shortly thereafter, nuclear forensics was endorsed at the Moscow Summit in ...
The 3001 Storage Canal is located under portions of Buildings 3001 and 3019 at Oak Ridge National Laboratory (ORNL) and has a capacity of approximately 62,000 gallons of water. The term canal has historically been used to identify this structure, however, the canal is an in-ground reinforced concrete structure satisfying the regulatory definition of a tank. From 1943 through 1963, the canal in Building 3001 was designed to be an integral part of the system for handling irradiated fuel from the Oak Ridge Graphite Reactor. Because one of the main initial purposes of the reactor was to produce plutonium for the chemical processing pilot plant in Building 3019, the canal was designed to be the connecting link between the reactor and the pilot plant. During the war years, natural uranium slugs were irradiated in the reactor and then pushed out of the graphite matrix into the system of diversion plates and chutes which directed the fuel into the deep pit of the canal. After shutdown of the ...
A plan has been put forth to strategically thin northern California forests to reduce fire danger and improve forest health. The resulting biomass residue, instead of being open burned, can be converted into ethanol that can be used as a fuel oxygenate or an octane enhancer. Economic potential for a biomass-to-ethanol facility using this softwood biomass was evaluated for two cases: Stand-alone and co-located. The co-located case refers to a specific site with an existing biomass power facility owned by Wheelabrator Environmental Systems Inc. near Martell, California. A two-stage dilute acid hydrolysis process is used for the production of ethanol from softwoods, and the residual lignin is used to generate steam and electricity. For a plant processing 800 dry tonnes per day of feedstock, the co-located case is an economically attractive concept. Total estimated capital investment is approximately $ 70 million for the ...
Closure of nuclear fuel cycle is considered as a way to reduce the hazards of nuclear power industry waste. The potential and prospects of different technologies and installations including ADTT in solving this problem are discussed. A new relative criterion is proposed to assess the dangers of the waste. Equilibrium mode approximation is used in the estimates. It is shown that irretrievable losses of actinides do not depend on relative intensity of burning. Neutron economy of accelerator-driven blankets is considered and an expression is derived for transmutation value of 'external' neutrons. 8 refs., 2 tabs.
Westinghouse Electric Germany GmbH has developed fluid dynamic models for medium-actuated armatures using the thermal hydraulic code RELAP5 in order to reach a more realistic description of the armature behavior including fluid-structure interactions in case of transient flow conditions in piping systems. The contribution is concerned with the modeling of damped check valves. The model allows the description of the behavior during opening and closure of a check armature. The calculated results show good agreement with the available measured data.
Experiments are described on a plasma cathode with biased grids to prevent entry of ions into the electron extraction gap. The cathode has potential applications to the generation of high-current pulsed electron beams. Operation at 20 A/cm"2 is theoretically possible. The source combines the low average power consumption of a plasma cathode with many of the attractive features of thermionic cathodes, such as space-charge-limited extractor gap electron flow, fast turn-on, and no diode closure. Initial experiments are reported at the 2 A/cm"2 level for pulse lengths to 160 #mu#s.
The purpose of this paper is to describe a technique of forced surgical rotation of the mandible used in skeletal Class II patients with deep bite and prominent chin. Posterior occlusal composite onlays combined with preoperative orthodontic treatment without anterior intrusion increase the posterior rotational component of the surgical mandibular advancement, when removed during operation. This manoeuvre allows for the surgical closure of the posterior open bite, while anteriorly the deep bite is opened. This technique avoids bimaxillary rotation surgery with dorsal impaction in mild to moderate cases. In any case, a chin setback osteotomy with compromised aesthetics can be avoided.
Aluminum hydroxide coatings on fuel elements stored in aluminum canisters in K West Basin were measured in July and August 1998. Good quality data was produced that enabled statistical analysis to determine a bounding value for aluminum hydroxide at a 99% confidence level. The updated bounding value is 10.6 kg per Multi-Canister Overpack (MCO), compared to the previously estimated bounding value of 8 kg/MCO. Thermal analysis using the updated bounding value, shows that the MCO generates oxygen concentrate that are below the lower flammability limits during the 40-year interim storage period and are, therefore, acceptable.
Sewage waste disposal facilities in the Florida Keys include septic tanks and individual package plants in place of municipal collection facilities in most locations. In Key Largo, both facilities discharge...Full Text Available
The discussion of energy usage falls naturally into three parts. The first is a review of what the problem is, the second is a description of steps that can be taken to conserve energy at existing facilities, and the third is a review of the implications of energy consumption on future facilities.
The two-phase flows involve interfacial interactions which modify significantly the structure of the mean and fluctuating flow fields. The design of the two-fluid models adapted to industrial flows requires the taking into account of the effect of these interactions in the closure relations adopted. The work developed in this thesis concerns the development of first order two-fluid models deduced by reduction of second order closures. The adopted reasoning, based on the principle of decomposition of the Reynolds stress tensor into two statistically independent contributions turbulent and pseudo-turbulent parts, allows to preserve the physical contents of the second order relations closure. Analysis of the turbulence structure in two basic flows: homogeneous bubbly flows uniform and with a constant shear allows to deduce a formulation of the two-phase turbulent viscosity involving the characteristic scales of bubbly ...
In Korea, the Proton Engineering Frontier Project (PEFP) is building a proton linear accelerator facility with energy up to 100MeV and a beam current of 20mA. In this study, a radiation field after shutdown in the accelerator facility of the PEFP was evaluated for the purpose of the radiation shielding by using MCNPX code. A facility modeling was performed for the accelerator tunnel building, accelerator chain, target rooms and beam experiment hall. And radiation source terms were evaluated in the facility. With this facility, model and radiation source terms, the concentration of 41Ar was evaluated and the cooling time satisfying regulation in Korea was calculated.
This issue is the collection of the papers on progress of researches by common utilization of JAERI nuclear facilities. The 43 of the papers are indexed individually. (J.P.N.)
This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.
The Institute of Energetic and Nuclear Research - IPEN is a research and development institution, located in a densely populated area, in the city of Sao Paulo. The nuclear fuel cycle was developed from the Yellow Cake to the enrichment and reconversion at IPEN. After this phase, all the technology was transferred to private enterprises and to the Brazilian Navy (CTM/SP). Some plants of the fuel cycle were at semi-industrial level, with a production over 20 kg/h. As a research institute, IPEN accomplished its function of the fuel cycle, developing and transferring technology. With the necessity of space for the implementation of new projects, the uranium hexafluoride (UF{sub 6}) production plant was chosen, since it had been idle for many years and presented potential leaking risks, which could cause environmental aggression and serious accidents. This plant decommission required accurate planning, as this work had not been carried out in Brazil before, for this ...
Nuclear knowledge is the basis for almost all nuclear activities, and education and training are the most fundamental means to transfer knowledge from one generation to the next. Understanding means and trends in knowledge transfer through education and training thus deserves a closer examination. In the past years, a number of trends and questions in nuclear knowledge, education and training have emerged. With declining student enrolment numbers and a general stagnation of the use of nuclear power in some of the IAEA's Member States, the issue of a slow erosion of the knowledge base and the possibility of loosing knowledge has become increasingly important, in particular if seen against the background of a possible renaissance of nuclear power in the future. In other Member States, an expansion of nuclear power is expected, with a corresponding need for human resources. As a result, in many Member States education and training of the next generation and succession ...
Full text: Founded in 1964, Ankara Nuclear Research and Training Center (ANRTC) conducts and facilitates the scientific activities including training (summer practice, MSc and Ph D studies in physics and chemistry, IAEA fellowship programs etc.), research and other studies in nuclear and related fields. As it's a part of main duties, ANRTC has analysis on the variety of samples, and radiation protection services commercially, for radiation workers in state, public and private sectors. Research, development and application projects implemented in this Center have mostly been supported by State Planning Organization (SPO) and Turkish Atomic Energy Authority (TAEA). In addition to the projects there are on going collaborative studies with some national Universities and International Atomic Energy Agency. The main activities carried out in ANRTC can be summarized as: studies on experimental nuclear physics, application of nuclear techniques such as XRF, XRD, Gamma, ...
An electron moving over the surface of a diffraction grating will transfer a part of its kinetic energy to radiation via a velocity synchronous coupling with a slow space harmonic component of the field. Since the phase velocity of a slow space harmonic is less than the speed of light, the slow components decay exponentially, or evanesce, with distance above the grating and the evanescence scale is determined by the product of the relative velocity, #beta#, the relative energy, #gamma#, and the wavelength #lambda#. Thus, in the relativistic regime, good electron - grating coupling can be maintained at beam heights that are greater than the emitted wavelength. In order to explore this regime a series of experiments have been carried out with moderately energetic beams and an experiment with the 70-MeV beam at the Accelerator Test Facility is in the planning stage. The work has two basic goals: the first is to explore the characteristics of the ...
The Reduced-Moderation Water Reactor (RMWR) is a next generation water-cooled reactor, based on the experienced light water reactor (LWR) technology, aiming at effective utilization of uranium resources, high burn-up and long operation cycle and plutonium multiple recycling. These characteristics can be achieved by the high conversion ratio from {sup 238}U to {sup 239}Pu resulted from the higher neutron energy spectrum in comparison to conventional LWRs. Considering the extension of LWR utilization, Japan Atomic Energy Research Institute (JAERI) started the research on it in 1997 and then started a collaboration in the conceptual design study with the Japan Atomic Power Company (JAPC) in 1998, under technical cooperation with three Japanese reactor vendors. In the core design study of the RMWR, several basic core designs with the high conversion ratio more than 1 and the negative void reactivity coefficient have been proposed, and then, subsequent investigation on the effects of ...
This document describes the development testing phase associated with the OTA Shear activity and defines the controls to be in place throughout the testing. The purpose of the OTA Shear Program was to provide equipment that is needed for the processing of 40 foot long, sodium wetted, irradiated core components previously used in the FFTF reactor to monitor fuel and materials tests. There are currently 15 of these OTA test stalks located in the Test Assembly Conditioning Station (TACS) inerted vault. These need to be dispositioned for a shutdown mission to eliminate this highly activated, high dose inventory prior to turnover to the ERC since they must be handled by remote operations. These would also need to be dispositioned for a restart mission to free up the vault they currently reside in. The waste handling and cleaning equipment in the J33M Cell was designed and built for the handling of reactor components up to the standard 12 foot length. This program will provide the equipment ...
Full text.This study focuses on the management of municipal solid waste (MSW) in Lebanon. It addresses the current status of MSW management in Lebanon in terms of collection, transport and disposal, infers the associated impacts of such practices and discusses mitigation measures and finally proposes basic guidelines for a national strategy for solid waste management in the country. The study is based on available previous investigations and on a field survey of 113 villages in four different countries. The study revealed the absence of an effective environmental policy and poor collection and disposal methods throughout the country, except for the Greater Beirut Area (G A), where better solid waste management practices are employed. Although collection of MSW outside GBA was found to be acceptable by local authorities, resources (labor and equipment) were not used efficiently. Furthermore, treatment of collected waste is almost not available. Waste collected is invariably open dumped ...
The Clean Air Act establishes New Source Review (NSR) programs that apply to the construction or modification of major stationary emissions sources. In 2002 and 2003, the U.S. Environmental Protection Agency revised its rules to narrow the applicability of NSR to facility renovations. Congress then mandated a National Research Council study of the effects of the rules. An electricity-sector model - the Integrated Planning Model (IPM) - was used to explore the possible effects of the equipment replacement provision (ERP), the principal NSR change that was to affect the power-generation industry. The studies focused in particular on coal-fired electricity generating units, EGUs, for two reasons. First, coal-fired EGUs are important contributors of these pollutants, accounting for approximately 70 and 20% of nations SO{sub 2} and NOx emissions in 2004, respectively. Second, the shares of total capacity of large coal-fired EGUs that lack flue-gas ...
A major focus of the National Nuclear Security Administration-led Next Generation Safeguards Initiative (NGSI) is the development of human capital to meet present and future challenges to the safeguards regime. An effective university-level education in safeguards and related disciplines is an essential element in a layered strategy to rebuild the safeguards human resource capacity. NNSA launched two pilot programs in 2008 to develop university level courses and internships in association with James, Martin Center for Nonproliferation Studies (CNS) at the Monterey Institute of International Studies (MIIS) and Texas A&M University (TAMU). These pilot efforts involved 44 students in total and were closely linked to hands-on internships at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL). The Safeguards and Nuclear Material Management pilot program was a collaboration between TAMU, LANL, and LLNL. The LANL-based coursework was shared with the ...
A a result of its former role as a producer of nuclear weapons components, the Rocky Flats Environmental Technology Site (RFETS), Golden, Colorado accumulated a variety of plutonium-contaminated materials. When the level of contamination exceeded a predetermined level (the economic discard limit), the materials were classified as residues rather than waste and were stored for later recovery of the plutonium. Although large quantities of residues were processed, others, primarily those more difficult to process, remain in storage at the site. It is planned for the residues with lower concentrations of plutonium to be disposed of as wastes at an appropriate disposal facility, probably the Waste Isolation Pilot Plant (WIPP). Because the plutonium concentration is too high or because the physical or chemical form would be difficult to get into a form acceptable to WIPP, it may not be possible to dispose of a portion of the residues at WIPP. The ...
Husky Oil received approval from the government to begin development of its White Rose properties located in the Jean d'Arc Basin, 350 km east of St. John's, offshore Newfoundland and Labrador. First oil is expected by the end of 2005. The South Avalon Pool was discovered in 1988 and is estimated to contain approximately 200-250 million barrels of oil. Husky Oil and Petro-Canada filed a development application with the Canada-Newfoundland Offshore Petroleum Board in January 2001. Approval of the $2.35 billion project was received in December 2001. The development plan is based on a newly-built floating production, storage and offloading (FPSO) vessel. Initial development will focus on the South Avalon Pool that has been tested in excess of 5,000 barrels per day. The pool will be developed using eight production wells, 11 water injection wells and two gas injection wells. An estimated 150 million cubic feet per day of gas will also be produced from ...
Determination of the suitability of the site for WIPP is only the first major phase in the evaluation of the radiological impact of the repository on the public health and safety. The Environmental Evaluation Group (EEG) will continue to independently review the design of the facility, the operational procedures, the criteria for packaging and shipment of the waste, the plans, procedures and results of the WIPP experiments, emergency preparedness, adherence to EPA and pertinent NRC regulations, and other important features of the project. EEG has concluded from existing evidence that the Los Medanos site for the WIPP project has been characterized in sufficient detail to warrant confidence in the validation of the site for the permanent emplacement of approximately 6 million cubic feet of defense transuranic waste. This conclusion is based on the assumption that the maximum surface dose rate for the unshielded remote-handled transuranic waste ...
The Geothermal Energy Association ({open_quotes}GEA{close_quotes}) will create and manage a Geothermal Heat Pump ({open_quotes}GHP{close_quotes}) Training Center to deliver GHP and HVAC courses throughout California in response to imminent demand driven by national promotion. GEA services include providing management structure, cadre, curricula, promotion and physical equipment. The Center is dedicated to infrastructure strengthening goals of the Geothermal Heat Pump Consortium, Inc. ({open_quotes}GHPC{close_quotes}), the California Energy Commission ({open_quotes}CEC{close_quotes}) and Interagency Geothermal Heat Pump Task Force, and Geothermal Energy Association ({open_quotes}GEA{close_quotes}). Second-half 1996 start-up is co-funded by GHPC, CEC, GEA and three California utilities. Initial support is to five utilities representing 70 percent of California power users. Goals include becoming market driven by year No. 3 and self-finding by year No. 5. AR training is provided at cost ...
This groundwater quality report (GWQR) contains an evaluation of the groundwater quality data obtained during the 1993 calendar year (CY) at several hazardous and non-hazardous waste management facilities associated with the US DOE Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. The groundwater quality data are presented in Part 1 of the GWQR submitted by Martin Marietta Energy Systems, Inc. to the Tennessee Department of Environment and Conservation (TDEC) in February 1994. Groundwater quality data evaluated in this report were obtained at several hazardous and non-hazardous waste management sites located within the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Chestnut Ridge Regime encompasses a section of Chestnut Ridge south of the Y-12 Plant and is one of three hydrogeologic regimes defined for the purposes of groundwater quality monitoring at the plant. The Environmental Management Department of ...
The construction of Heavy Ion Medical Accelerator in Chiba (HIMAC) at the National Institute of Radiological Sciences was completed in December 1993. HIMAC consists of an injector linac, two synchrotron rings, a high energy beam transport system and a beam irradiation system. Its accelerator parameters are based on the medical requirement, and helium, carbon, neon, silicon and argon were selected as the accelerated ion species. It has 3 therapy rooms (A{approx}C). Room A has a vertical irradiation system, Room C horizontal and Room B both vertical and horizontal. Two rings can supply beams independently to the vertical and horizontal irradiation systems. Clinical trial started on June 21 1994, after several basic biological and physics experiments lasting about 2 months. Cancer is the top cause of death in Japan since 1981, and people expect good treatment results at HIMAC. Proton and heavy ion radiotherapy has the advantage of dose distribution and biological effect in comparison with ...
Characteristics of the Ukrainian NSA NRI radiation facility for scientific researches and developments of industrial radiation technology are performed. Parts of the facility, design peculiarities of technical tools are described. Biological protection of the facility and radiation protection system, transport line, systems of technical provision and radiation measurements are discussed
In this paper the possibility of using the test facility PACTEL concerning the investigations of thermal hydraulic special features of the primary coolant circuit acting under natural circulation is under consideration. It is suggested to study a stratification phenomenon of a coolant in upper plenum of a reactor and also a horizontal steam generator (HSG) hot collector temperature regime. For such investigations the facility must be modified. It is shown that this work is not large and expensive, as the facility is a lightly suitable unit for different researches. (orig.)
In this paper the possibility of using the test facility PACTEL concerning the investigations of thermal hydraulic special features of the primary coolant circuit acting under natural circulation is under consideration. It is suggested to study a stratification phenomenon of a coolant in upper plenum of a reactor and also a horizontal steam generator (HSG) hot collector temperature regime. For such investigations the facility must be modified. It is shown that this work is not large and expensive, as the facility is a lightly suitable unit for different researches. (orig.)
A thermal neutron imaging facility for computed tomography and real-time neutron radiography is being developed at the University of Texas at Austin. The TRIGA reactor is a graphite-reflected Mark It pool-type research reactor. The neutron imaging facility will use beam port, which is at one end of a through part. Monte Carlo calculations were used to design the neutron collimator for this facility.
... harassment, incidental to construction and operation of an offshore liquefied natural gas (LNG) facility. Under the Marine Mammal Protection ... ...
Korea Atomic Energy Research Institute (KAERI) has many R and D facilities in operation, including HANARO research reactor, radioactive waste treatment facility (RWTF), post-irradiation examination facility (PIEF) and irradiated material test facility (IMEF). Recently, nation-wide interest is focused on the safety and security of major industrial facilities. Safe operation of nuclear facilities is imperative because of the consequence of public disaster by radiological release/ contamination, in case of an accident. Recently, Ministry of Science and Technology (MOST) of the Korean government announced amendments of Atomic Energy laws to enforce requirements of the physical protection and radiological emergency. In this paper, the context of amended Atomic Energy laws were reviewed to confirm quality assurance measures and identify additional QA activities, if ...
The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste.
This report describes a quality assurance program plan for the Yucca Mountain Project. Aspects of the plan include: document control, equipment maintenance and calibration, process control, audits, computer software, and inspections. (CBS)
This paper describes the deliverables framework developed by Vanderbilt University Medical Center (VUMC) in its IAIMS planning process. The key deliverables include: visions for the future; mission,...Full Text Available
Four-dimensional (4D) radiotherapy is the explicit inclusion of the temporal changes in anatomy during the imaging, planning, and delivery of radiotherapy. One key component of 4D radiotherapy planning...Full Text Available
This report gives an overview of KIDS (Kestrel Interactive Development System). We describe a program derived with KIDS to solve the Missionaries and Cannibals problem (MC PROBLEM), a classical AI planning problem. Our interest in this problem arose as th...
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning mi...
ObjectivesTo describe the plans of English NHS hospitals to implement ePrescribing systems.Design and settingQuestionnaire-based survey of attendees...Full Text Available
Adaptive radiation therapy (ART) is the incorporation of daily images in the radiotherapy treatment process so that the treatment plan can be evaluated and modified to maximize the amount of radiation...Full Text Available
This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).
Given the high prevalence of overweight and low levels of physical activity among children, a better understanding of physical activity behaviour is an important step in intervention planning. This...Full Text Available
Megavoltage photon intensity-modulated radiation therapy (IMRT) is typically used in the treatment of prostate cancer at our institution. Approximately 1% to 2% of patients with prostate cancer have hip prostheses. The presence of the prosthesis usually complicates the planning process because of dose perturbation around the prosthesis, radiation attenuation through the prosthesis, and the introduction of computed tomography artifacts in the planning volume. In addition, hip prostheses are typically made of materials of high atomic number, which add uncertainty to the dosimetry of the prostate and critical organs in the planning volume. When the prosthesis is bilateral, treatment planning is further complicated because only a limited number of beam angles can be used to avoid the prostheses. In this case study, we will report the observed advantages of using noncoplanar beams in the delivery of IMRT to ...
The purpose of this work is to develop a novel feature-based registration strategy to automatically map the rectal contours from planning computed tomography (CT) (pCT) to cone beam CT (CBCT). The rectal...Full Text Available
The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3.
BackgroundObesity has reached epidemic proportions in the United States. It is implicated in the development of a variety of chronic disease states and is associated with increased...Full Text Available
Purpose:To investigate the clinical usage of dose verification of Helical Tomotherapy plans by using 2D-array ion chambers, and to develop an efficient way to validate the dose delivered...Full Text Available
BackgroundThe purpose of our investigation was to compare a digital templating system to conventional templating techniques when preoperatively planning for total hip arthroplasty.MethodsWe...Full Text Available
The aim of this study is to develop an Automatic Post-processing Tool for four-dimensional (4D) treatment planning (APT4D) that enables the user to perform some necessary procedures related...Full Text Available
Program plans of the Office of Coal Technology in coal liquefaction are presented. Technology description, status, market applications, program strategy and program management descriptions are included. 2 figs. (CBS)
The Plan identifies the Army's organization, goals, objectives, and policies with respect to energy. It projects energy consumption and costs to the year 2000 and summarizes the programs required to support the long range goals. A summary of current and needed energy related legislation is included. (Author)
In June 2010, Basic Energy Plan was approved in a Cabinet meeting. It says that Japan aims to construct more than 14 atomic power plants by 2030. Today, there are 12 plans of construction of atomic power plant, but it is hard to say that their plans easily come off. That's because public acceptance of atomic power plant is low in Japan, for example local residents wage opposition campaigns. This study conducts a survey in the form of a questionnaire and analyzes it by Analytical Hierarchical Process (AHP). Analytic Hierarchy Process is a structured technique for dealing with complex decisions. A questionnaire using AHP is very easy to answer and analyze. This survey was conducted in 2 areas. First area is Hohoku-cho, Yamaguchi Pref. that had a plan of construction of atomic power plant and the plan was demolished by opposition campaigns. Second area is Kaminoseki-cho, Yamaguchi ...
...2010-10-01 false Special rules relating to group health plans. 146.145 Section 146.145 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS REQUIREMENTS FOR THE GROUP HEALTH...
42 Public Health 3 2010-10-01 2010-10-01 false Health benefits plan: Supplemental health services. 417.102 Section 417.102 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF...
Abstract: HARVEST was designed as a strategic research and planning tool, allowing assessment of the spatial pattern consequences of broad timber management ...
... due to the evolving nature of the Strategy Maps and the changing priority roles, it was decided not to link the SMSP directly with any Strategic Plans. ...
... CJCSI 3141.01C, Responsibilities for the Management and ... of a multivolume set of CJCS unclassified and ... (1) CJCSM 3122.01A, Joint Operation ...
The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.
The Savannah River Site (SRS) is currently developing a new facility, the Actinide Packaging and Storage Facility (APSF), to process and store legacy materials from the United States nuclear stockpile. A variety of materials, with a variety of properties, packaging and handling/storage requirements, will be processed and stored at the facility. Since these materials are hazardous and radioactive, automation will be used to minimize worker exposure. Other benefits derived from automation of the facility include increased throughput capacity and enhanced security. The diversity of materials and packaging geometries to be handled poses challenges to the automation of facility processes. In addition, the nature of the materials to be processed underscores the need for safety, reliability and serviceability. The application of automation in this facility must, ...
Slow, unexpected displacements have been experienced in most pressurized water reactor (PWR) surge lines. Sometimes, these displacement lead to gap closure at the pipe whip restraints. These movements occur because of thermal stratification. This movement has the potential to increase stresses to valves, which may exceed the material yield stress. To understand this phenomenon, Framatome, Commissariat a l'Energie Atomique, and Electricite de France have undertaken large programs for the study of (1) thermal-hydraulic tests with a half-scale Plexiglas surge line, (2) thermal-hydraulic computations of permanent states and transients with a two-dimensional model, and (3) mechanical analysis of displacements and computation of fatigue damage due to stratification. This paper deals with the last subject. Avoiding stratification in piping by process modifications is difficult because of the high flow rate needed. Alternative solutions for coping with ...
The US Department of Energy (DOE) has millions of gallons of high level nuclear waste stored in underground tanks at Hanford, Washington and Savannah River, South Carolina. These tanks will eventually be emptied and decommissioned. This will leave a residue of sludge adhering to the interior tank surfaces that may contaminate groundwaters with radionuclides and RCRA metals. Experimentation on such sludges is both dangerous and prohibitively expensive so there is a great advantage to developing artificial sludges. The US DOE Environmental Management Science Program (EMSP) has funded a program to investigate the feasibility of developing such materials. The following text reports on the success of this program, and suggests that much of the radioisotope inventory left in a tank will not move out into the surrounding environment. Ultimately, such studies may play a significant role in developing safe and cost effective tank closure strategies.
In a 47-year-old male patient a bronchopleural fistula was apparent 22 days after extended right-sided diaphragma-pericardio-pleuro-pneumonectomy for pleuramesothelioma. The thoracic cavity was infected. Rethoracotomy was performed and the fistula was closed using an omental pedicle flap. The bronchial stump became tight and the cavity fluid became sterile. No abdominal complications were seen. The patient died 8 months later from malignant pericardial infiltration. The ability of greater omentum to revascularize ischemic tissue, to absorb fluid and to resist local infection is proved and used in several subspecialities of surgery. Nevertheless the use of the greater omentum in the management of bronchopleural fistula has been rarely published. The reported case shows that the closure of a large bronchopleural fistula is possible by using the attributes of the omental tissue. PMID:2264043
Fatigue crack growth tests of three ferrite-pearlite steels with different size and spacing of pearlite particles, which were uniformly distributed in the ferrite matrix, were carried out to investigate the effect of microstructure on fatigue crack growth behavior in the Paris regime. The fatigue crack growth rates for the three materials did not coincide with each other, even when the crack growth curves were arranged by the effective stress intensity factor range. From in situ observations, crack tip stress shielding phenomena, such as interlocking and branching, were found on the crack wake, which enhanced fatigue crack growth resistance. A small size and spacing of pearlite particle seemed to induce small but frequent crack deflections, which resulted in crack closure phenomena. On the...
The report identifies and analyzes the economic impacts of water pollution control regulations on the battery manufacturing industry. These regulations include effluent limitations and standards based on BPT (best practical control technology currently available), BAT (best available technology economically achievable), PSES (pretreatment standards existing sources), NSPS (new source performance standards), and PSNS (pretreatment standards new sources), that have been promulgated under authority of Sections 301, 304, 306, 307, 308, and 501 of the Federal Water Pollution Control Act, as Amended (the Clean Water Act). The primary economic impact variables of interest include price changes, plant closures, substitution effects, changes in employment, shifts in the balance of foreign trade, changes in industry profitability, structure, and competition, and impacts on small business.
The purpose of the study is to analyze the economic impacts that are likely to result from promulgation of the proposed best practicable control technology (BPT), best available technology economically achievable (BAT) and Best Conventional Technology (BCT) effluent limitations and standards on placer mining in the United States. The results of the economic impact analysis will help establish pollution control regulations that are economically achievable. The analysis examines how each of four alternative pollution control technologies affects the financial viability of placer mines in the United States. The impacts examined include reduced profitability, production cutbacks, mine closures, and employment and earning losses, as well as impacts to the local economies.
The use of chemically selective laser ionization combined with beta-delayed neutron counting at ISOLDE has permitted identification and half-life measurements for {sup 61}Mn up through {sup 69}Mn. The 14(4)-ms half life for {sup 69}Mn is one of the shortest determined for any nuclide beyond the sd shell. Gamma-ray singles and coincidence spectra have been determined for the decays of {sup 64,66}Mn to levels of {sup 64,66}Fe, revealing strong deformation and vanishing of the N=40 subshell in the Fe isotopes. {copyright} {ital 1998 American Institute of Physics.}
The use of chemically selective laser ionization combined with beta-delayed neutron counting at ISOLDE has permitted identification and half-life measurements for "6"1Mn up through "6"9Mn. The 14(4)-ms half life for "6"9Mn is one of the shortest determined for any nuclide beyond the sd shell. Gamma-ray singles and coincidence spectra have been determined for the decays of "6"4","6"6Mn to levels of "6"4","6"6Fe, revealing strong deformation and vanishing of the N=40 subshell in the Fe isotopes.
The subject of cosmic ray antiproton production is reexamined by considering other choices for the nature of the Majorana fermion chi other than the photino considered in a previous article. The calculations are extended to include cosmic-ray positrons and cosmic gamma rays as annihilation products. Taking chi to be a generic higgsino or simply a heavy Majorana neutrino with standard couplings to the Z-zero boson allows the previous interpretation of the cosmic antiproton data to be maintained. In this case also, the annihilation cross section can be calculated independently of unknown particle physics parameters. Whereas the relic density of photinos with the choice of parameters in the previous paper turned out to be only a few percent of the closure density, the corresponding value for Omega in the generic higgsino or Majorana case is about 0.2, in excellent agreement with the value associated with galaxies and one which is sufficient to give the halo mass. 52 ...
A nonlinear free boundary-value problem of supercavitating flow past n + 1 hydrofoils is analyzed. To describe the cavities' closure mechanism, the Tulin-Terentev single-spiral-vortex model is employed. The flow domain is considered as the image of an (n + 1)-connected circular domain. The conformal map is constructed in terms of the solutions to two Riemann-Hilbert problems of the theory of symmetric automorphic functions. One of the problems is homogeneous and its coefficients are continuous functions while the second problem is inhomogeneous and has discontinuous coefficients. The exact solutions to the problems are found by using quasiautomorphic and quasimultiplicative analogs of the Cauchy kernel. The case of a single plate is considered in detail and the numerical results are report...
The residing fracture system and the prevailing in situ stresses have a significant impact on fluid flow and heat transfer in crystalline rocks. The long term response of fracture systems to changes in effective stresses, in particular the long term geo-mechanical effects of thermal stresses on reservoir characteristics is of particular interest to the geothermal industry.In this paper, a geothermal reservoir model is presented, in which a thermo-poroelastic finite element module is coupled to a fracture geomechanical module. This describes fracture closure as a function of effective stress and the changes in parameters, such as effective permeability, porosity and discrete fracture apertures. The novelty of this approach lies in its dynamic treatment of the characteristic properties of in...
The United States Department of Energy (U.S. DOE) has recently implemented a series of strategic initiatives to address long-term radiological surveillance needs at former U.S. nuclear test sites in the Marshall Islands. The plan is to engage local atoll communities in developing shared responsibilities for implementing radiation protection monitoring programs for resettled and resettling populations in the northern Marshall Islands. Using the pooled resources of the U.S. DOE and local atoll governments, individual radiological surveillance programs have been developed in whole body counting and plutonium urinalysis in order to accurately assess radiation doses resulting from the ingestion and uptake of fallout radionuclides contained in locally grown foods. Permanent whole body counting facilities have been established at three separate locations in the Marshall Islands including Rongelap Atoll (Figure 1). These facilities ...
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning missions. Careful logistical and operational planning can optimize the health, performance, and readiness of the working dog while protecting the safety and well-being of the team members working with them. We also offer recommendations for medical treatment of dog bites. PMID:19813342
The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site.
The reports in this series are designed primarily to familiarize professional land use and resource planners with the range of possibilities and effective procedures for achieving integrated mining, reclamation, and land use planning. These reports are ba...
IAEA Plans of activities include, General Conference in September 2001 which reviewed activities relevant to preventing nuclear terrorism and proposed master plan. The Board of Governors approved new Nuclear Security Plan for the next four years. Three activity areas are; - needs assessment, analysis and coordination, prevention and detection and response.
The Hungarian Power Companies Ltd. has been using the IAEA planning methodologies since 1985 when it acquired the WASP model. Since then this model has been applied on a regular basis to determine the least cost expansion plan of the power generating system of the country. This report describes this experience as well as the application of the WASP model for other types of studies. (author).
The Conference on Building Design and Architecture organized by Swedish Council for Building Research Contents included articles on building physics, thermal-climate technology, and building location and planning.
An experimental plan for improving the problems of failed fuel location system in Wolsung Unit-2 reactors was established. It is not possible to make an experiment on the failed fuel monitoring nuclides in the cold laboratories because they have very short half life. Therefore, the experiments can be only carried out at the existing monitoring system under reactor operation. For that reason, an experimental plan was drawn up for installing the radiation detection system on reactor site.
Topics of this proceedings are: DNA damage and repair; Space research; Cell and tissue radiobiology; Treatment planning 1: The role of clinical RBEs; Treatment planning 2: Dose optimization and inverse planning; Dosimetry; Clinical results of particle therapy and new techniques; Status reports and future developments. Separate abstracts were prepared for 79 chapters. (orig./SR)
The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades.
The Office of Environmental Management's (EM) Roadmap, U.S. Department of Energy--Office of Environmental Management Engineering & Technology Roadmap (Roadmap), defines the Department's intent to reduce the technical risk and uncertainty in its cleanup programs. The unique nature of many of the remaining facilities will require a strong and responsive engineering and technology program to improve worker and public safety, and reduce costs and environmental impacts while completing the cleanup program. The technical risks and uncertainties associated with cleanup program were identified through: (1) project risk assessments, (2) programmatic external technical reviews and technology readiness assessments, and (3) direct site input. In order to address these needs, the technical risks and uncertainties were compiled and divided into the program areas of: Waste Processing, Groundwater and Soil Remediation, and Deactivation and Decommissioning ...
The high spatial resolution of state-of-the-art commercial satellite imagery provides a good basis for recognising and monitoring even small-scale structural changes within nuclear facilities and for planning of routine and/or challenge inspections of nuclear sites. Despite the advantages of the improved spatial resolution some problems exist that may make the interpretation of the changes more difficult: Firstly, the results of the change analysis can be very complex and unclear at a glance. Secondly, shadow formation and off-nadir images due to different sensor and solar conditions at the acquisition times can cause false signals or overlap real changes. In view to the fast-growing amount of data from different sensor types there are then some requirements of an effective change detection procedure for safeguards purposes: i. The techniques involved should possess a certain amount of robustness in terms of small misregistration errors, ...
The University of Maryland at Baltimore was awarded a grant from the Department of Energy to test a specially modified incinerator to burn biomedical radioactive waste. In preparation for the incinerator, the Radiation Safety Office devised a comprehensive plan for its safe and effective use. The incinerator plan includes a discussion of regulations regarding on-site incineration of radioactive waste, plans for optimum use in burning four principal waste forms, controlled air incineration technology, and standard health physics safety practices; a use plan, including waste categorization and segregation, processing, and ash disposition; safety procedures, including personnel and area monitoring; and methods to evaluate the incinerator's effectiveness by estimating its volume reduction factors, mass and activity balances, and by determining the cost effectiveness of incineration versus ...
This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition.
Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the ...
Full text: The IRSN has been organizing enquiries with the French population about risk and risk perception for a long time. In 2002, a collaboration between the IRSN in France and the SCK.CEN in Belgium has been set-up to simultaneously (November 2002) organise this poll in both countries. In each country, a representative sample of the population (over 1000 participants per country) has been consulted by Computer Aided Personal Interviews of about 30 minutes with the professional help of commercial companies: BVA in France and Research International in Belgium. The enquiry yields a broad spectrum of interesting data; here only the results relevant for the emergency context will be presented. One should be aware that these data were collected in a 'normal' period; important differences in behaviour may occur given a serious crisis. A first finding is that more than half of the respondents are convinced that an accident as severe as the Chernobyl disaster may happen in their country as ...
Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems ...
A consortium of four institutions, based at Western Michigan University, was to plan a Research and Development Center on Student Testing, Evaluation, and Standards Setting. The four consortium sites are Boston College, the Dallas Independent School District, the University of Kansas, and Western Michigan University. This report is a final performance report for the planning grant made to Western Michigan University by the National Institute of Education. The first section provides a summary of the planning activities actually conducted under the grant. It includes a description of particular problems and successes, a list of participants and their affiliations, and an evaluation report for the planning project. The second section is a technical report on the Research and Development (R and D) mission for the Center. It updates the mission and strategy statement contained in the ...
This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As ...
Purpose: Various published reports involving intensity-modulated radiotherapy (IMRT) plans developed using automated optimization (inverse planning) have demonstrated highly conformal plans. These reported conformal IMRT plans involve significant target dose inhomogeneity, including both overdosage and underdosage within the target volume. In this study, we demonstrate the development of optimized beamlet IMRT plans that satisfy rigorous dose homogeneity requirements for all target volumes (e.g., #+-#5%), while also sparing the parotids and other normal structures. Methods and Materials: The treatment plans of 15 patients with oropharyngeal cancer who were previously treated with forward-planned multisegmental IMRT were planned again using an automated optimization system developed in-house. The optimization system ...
A limited program of field measurements was undertaken in order to define the wind characteristics of the DOE/Sandia vertical axis wind turbine test facility. Because micrometeorological conditions under which a particular wind turbine is tested may have ...
This report provides the results of a JASON review of the technical feasibility of using the Department of Energy`s (DOE`s) Fast Flux Test Facility (FFTF) to generate tritium needed for the enduring United States nuclear weapons stockpile.
A brief overview of the conceptual design of a solar central receiver system integrated with an existing cogeneration facility is provided. A synopsis of the performance and economic evaluation, and an assessment of the concept from the site owner's perspective are given.
The results of the two most recently completed runs at the Wilsonville Advanced Coal Liquefaction Research and Development Facility are presented. In Run 255, initial screening of operating conditions for the liquefaction of a Texas lignite was completed....
Two cases of pulmonary alveolar proteinosis, including one death, occurred in workers at a facility producing indium-tin oxide (ITO), a compound used in recent years to make flat panel displays. Both...Full Text Available
The Heat Cycle Research Facility (HCRF) is an experimental binary-cycle facility used to investigate different concepts and/or components for generating electrical power from a geothermal resource. This report briefly desc
... Radon gas concentrations are measured using instruments with calibrations traceable to the UK National Physical Laboratory and PTB, Germany. The primary facility is a 43 m3 walk-in chamber accessed by an airlock. Radon gas is maintained at a level in this chamber that is ...
This volume is a summary of the results of the final report of the Energy Engineering Analysis Program (EEAP) Study of 30 selected dining facilities at Fort Campbell, Kentucky.
Thirty-seven papers were presented at this conference in five sessions. Topics covered include regulation, control and consequences of decontamination; decontamination of components and facilities; chemical and non-chemical methods of decontamination; and TMI decontamination experience.
In the study three loss-of-feedwater type experiments which were preformed with the PACTEL facility has been calculated with two computer codes. The purpose of the experiments was to gain information about the behaviour of horizontal steam generator in a ...
The Sheep Mountain area, in the southwest Wind River Basin, is the up plunge closure of the Derby Dome-Winkleman Dome producing trend of an echelon folds which comprise the first line of folding down the northeast flank of the Wind River Mountains. The structural style exposed in the Palozoic reservoir rocks of Sheep Mountain may serve as a model for the other structural features in the Wind River Basin. As in the case of the Derby Dome and Winkleman Dome, Sheep Mountain is typically asymmetric to the southwest. Local east-directed thrusts exposed in the core of the anticline place Pennsylvania over Permian age rocks. A major change in the trend of the anticlinal crest within Sheep Mountain, suggests development of separate left-stepping en echelon closures at depth. The northwest end of Sheep Mountain also forms a left-stepping en echelon pattern with Derby Dome. The northwest plunge of Sheep Mountain is facilitated by compartmentalization ...
Full text: Disorders of brain development and phakomatosis are resulting from disturbed embryonic-foetal development One third of all major embryological anomalies involve CNS, and over 2000 different anomalies have been described. Anomalies of the brain often cause foetal and neonatal death, and mental and physical retardation in pediatric group. The majority of disorders of brain development and phakomatosis are idiopathic, and most of them are not hereditary or familial. Ultrasonography plays the important role in screening foetal and neonatal brain, but after closure of fontanels it is difficult to find the acoustic window. CT has limited contrast resolution, and disadvantage exposing infant to ionizing radiation. It is helpful to demonstrate the presence of calcifications. MR imaging has proved to be a diagnostic tool of major importance in children with disorders of brain development and phakomatosis. The excellent grey/white matter differentiation and ...
After having recalled the formal convergence of the semi-classical multi-species Boltzmann equations toward the multi-species Euler system (i.e. mixture of gases having the same velocity), we generalize to this system the closure relations proposed by B. Despres and by F. Lagoutiere for the multi-components Euler system (i.e. mixture of non miscible fluids having the same velocity). Then, we extend the energy relaxation schemes proposed by F. Coquel and by B. Perthame for the numerical resolution of the mono-species Euler system to the multi-species isothermal Euler system and to the multi-components isobar-isothermal Euler system. This allows to obtain a class of entropic schemes under a CFL criteria. In the multi-components case, this class of entropic schemes is perhaps a way for the treatment of interface problems and, then, for the treatment of the numerical mixture area by using a Lagrange + projection scheme. Nevertheless, we have to find a good projection ...