A Lawrence Livermore National Laboratory (LLNL) Management Pre-Start Review (MPR) Team was formed to independently verify the operational readiness of Building 368 (B368) Biosafety Level III (BSL-3) Facility to conduct research with biological pathogens and toxins including those considered Select Agents. Review objectives and criteria were developed from the DOE/NNSA and LLNL requirements. These were provided in the Implementation Plan for the Biosafety Level III (BSL-3) Facility Management Pre-Start Review (BSL-3 MPR) at Lawrence Livermore National Laboratory that was reviewed and approved by DOE/NNSA-LSO. The formal part of the LLNL MPR for the BSL-3 Facility was begun in August of 2005 but work on the MPR was stopped in October of 2005 due to the need for LLNL to reassess organizational and operational controls and respond to Centers for Disease Control and Prevention inquiries related to a shipping ...
Finding innovative ways to reduce waste streams generated at US Department of Energy (DOE) sites by 50% by the year 2000 is a challenge for DOE`s waste minimization efforts. A team composed of members from several DOE facilities used the quality tool known as benchmarking to improve waste minimization efforts. First the team examined office waste generation and handling processes at their sites. Then team members developed telephone and written questionnaires to help identify potential ``best-in-class`` industry partners willing to share information about their best waste minimization techniques and technologies. The team identified two benchmarking partners, NIKE, Inc., in Beaverton, Oregon, and Microsoft, Inc., in Redmond, Washington. Both companies have proactive, employee-driven environmental issues programs. Both companies report strong employee involvement, management ...
The US Department of Energy has provided support to four universities and the Oak Ridge National Laboratory in order to pursue research leading to the development and deployment of an advanced robotic system capable of performing tasks that are hazardous to humans, that generate significant occupational radiation exposure, and/or whose execution times can be reduced if performed by an automated system. The goal is to develop a generation of advanced robotic systems capable of performing surveillance, maintenance, and repair tasks in nuclear facilities and other hazardous environments. This goal will be achieved through a team effort among the Universities of Florida, Michigan, Tennessee, Texas, and the Oak Ridge National Laboratory, and their industrial partners, Combustion Engineering, Martin Marietta Baltimore Aerospace, Odetics, Remotec, and Telerobotics International. Each of the universities and ORNL have ongoing ...
This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.
This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH FacilityMaintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions ...
This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 {open_quotes}Nuclear Facilities{close_quotes}. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP.
This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.
Radioisotope facilities were operated to support research, development and production of radioisotopes. Irradiation facilities were operated to offer irradiation service to the clients. Even though intensive periodical checks and some essential maintenance had been carried out the results of RI facilitymaintenance seemed to be not much satisfactory due mainly to the shortage of skilled manpower and maintenance expenses. High intensity {gamma} irradiator was normally operated 426 times for overall 3,440 hrs, and the low intensity {gamma} irradiator was operated 157 times for overall 11,092 hrs, respectively. (author)
Technology transfer is an integral part of Framatome's general approach to its Chinese partners for the Daya Bay, Ling Ao, and Qinshan phase 2 nuclear power plant projects. It has been the subject of major operations covering all activities relevant to project management, design and engineering, manufacturing, and maintenance know-how. This presentation is more particularly devoted to nuclear island maintenance knowledge, which has been extensively transferred by Framatome to the Daya Bay plant owner over a period of four years, through a program including the constitution of mixed Franco-Chinese teams to handle plant maintenance, shadow training of Chinese specialists in the maintenance work performed by Framatome or its subcontractors in France, and theoretical training sessions on equipment mockups in China and France. (author)
With the increased costs of maintaining boilers and chillers entrepreneurs around the country have offered magnetic and similar devices to facilities as viable alternatives to their maintenance program. This report gives a brief history of some of the pre...
The Nuclear Data Interface (NDI) code library and data formats are the standards for multigroup nuclear data at Los Alamos National Laboratory. NDI's analysis, design, implementation, testing, integration, and maintenance required a ten person-year and ongoing effort by the Nuclear Data Team. Their efforts provide a unique, contemporary experience in producing a standard component library. In reflection upon that experience at NDI's decennial, we have identified several factors critical to NDI's success: it addressed real problems with appropriate simplicity, it fully supported all users, it added extra value through the code to the raw nuclear data, and its team went the distance from analysis through maintenance. In this report we review these critical success factors and discuss their implications for future standardization projects.
This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other ...
This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific ...
This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B ...
This Maintenance Implementation Plan (MIP) has been developed for. implementation of the US Department of Energy (DOE) Order 4330.4A. Maintenance Implementation Program (DOE 1990) at the Hanford Site Solid Waste complex. It addresses maintenance functions associated with Solid Waste Management, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for Solid Waste was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The MIP assessment disclosed that most elements defined in the order are currently implemented for Solid Waste. It also identified issues which must be addressed to bring the maintenance function into full compliance with DOE Order ...
A summary of the 1983 Critical Solvent Deashing unit performance at the Wilsonville Advanced Coal Liquefaction R and D Facility is presented. All periods of on feed operation, unscheduled shutdowns, and scheduled shutdowns are accounted for and tabulated. Causes of unscheduled shutdowns are identified and discussed. Details of repeated, major maintenance problems with various pieces of equipment are presented. Where applicable, solutions are discussed. Historical operations and maintenance data are presented and used for comparison purposes in order to better indicate areas of improvement in the unit. 4 references, 7 figures, 3 tables.
During the last fifteen years a variety of instruments and transducers, such as voltage plugs, power transducers, flow and pressure transducers, recorders and tensometers, have been developed for underground use in measuring the performance and technical parameters of prototype machines. The equipment, until recently, has been in a portable form and was found useful by the industry generally, in fault finding and trouble-shooting exercises and in commissioning procedures performed by small teams on a call-out basis. Over the last five years the test equipment has been adapted and the techniques modified to suit individual colliery-based operations with more permanent machine mounted and built-in transducers. At the moment these techniques operate within the framework of a statutory planned preventive maintenance scheme for each mine. This paper discusses the merits of changing from preventive maintenance to condition-based ...
This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP`s current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to ...
This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and ...
This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; ...
Many types of maintenance activities are performed on contaminated (radioactive) machines and components at the Fast Flux Test Facility (FFTF). When personnel dose levels are within permissible limits, maintenance is performed in contaminated work areas or in gloveboxes. Otherwise, maintenance is performed in the Interim Examination and Maintenance (IEM) Cell, a hot cell that is used to perform tasks that require remote operation. Maintenance is often a combination of manual and remote operation. One such operation was the cleaning of the closed loop ex-vessel machine (CLEM) core component grapple (CCG). The CLEM is used to transfer core components in and out of the reactor vessel. The CCG had not been operating properly due to buildups of metallic sodium and sodium compounds on the outside surface and internal moving parts. This paper tells how the CCG was ...
An overall view of the 1982 plant operating performance is presented. All periods of ON-FEED operation, UNSCHEDULED SHUTDOWNS, and SCHEDULED SHUTDOWNS are accounted for and tabulated. Causes of UNSCHEDULED SHUTDOWNS are identified and discussed. Plant solutions aimed at reducing the effect of similar future shutdowns or preventing recurrence of such shutdowns are explained. Details of repeated, major maintenance problems with various pieces of equipment are presented. Discussion of each problem and solutions found during 1982 are given, where applicable.
High conductivity liquid waste, which is produced in nuclear power plants, is now processed with radwaste evaporator. The concentrated liquid waste in the evaporator is so highly radioactive and corrosive that the improvement on maintenability and reduction of exposure dose rate are desirable as well as high decontamination factor (DF). Fuji Electric constructed the improved experimental facility of evaporator and carried out an experiment to demonstrate DF, maintenability and controllability of system. As the results, DF, maintenability and controllability were proved to be excellent and its applicability to nuclear power plant was well established.
Aqueous solutions (mixed waste) generated from various LLNL operations, such as debris washing, sample preparation and analysis, and equipment maintenance and cleanout, were combined for storage in the B695 tank farm. Prior to combination the individual waste streams had different codes depending on the particular generating process and waste characteristics. The largest streams were CWC 132, 791, 134, 792. Several smaller waste streams were also included. This combined waste stream was treated at LLNL's waste treatment facility using a vacuum filtration and cool vapor evaporation process in preparation for discharge to sanitary sewer. Prior to discharge, the treated waste stream was sampled and the results were reviewed by LLNL's water monitoring specialists. The treated solution was discharged following confirmation that it met the discharge criteria. A major source, accounting for 50% for this waste stream, is metal ...
This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.
The Interim Examination and Maintenance (IEM) Cell is located within the Fast Flux Test Facility (FFTF) Reactor Containment Building. This cell is a complex vertical hot cell whose purpose is to process reactor experiments and to perform maintenance on reactor and refueling components. Because access to this very complex cell is limited, a mock-up called the IEM Training Facility (IEMTF) has been developed. The IEMTF provides the IEM cell with many valuable benefits. Four of these benefits are: (1) development of alternate processing methods; (2) hands-on evaluation of equipment problems; (3) a ready source of verified parts, and (4) training facilities for IEM Cell technicians.
Faced with a changing business emphasis, plus the need to reduce operations and maintenance costs in the North Sea, the Forties Field engineering partnership between BP and Brown and Root recognised the need to make radical changes in its organisational structure. An innovative change management programme was planned and executed inside 12 months with the purpose of right-sizing the Forties Operations Engineering team. Not only has the initiative succeeded in cutting costs by 40 per cent; it has also enhanced the quality of engineering support services supplied to the BP Forties platforms. (author)
Surveillance and maintenance (S & M) of 75 sites were conductd by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals. S & M activities on these sites were conducted from the end of their operating life until final facility disposal or site stabilization. The objectives of the Waste Area Grouping S & M Program are met by maintaining a program of routine S & M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program`s activities and includes tables indicating tank levels and dry well data for FY 1991.
Surveillance and maintenance (S M) of 75 sites were conductd by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals. S M activities on these sites were conducted from the end of their operating life until final facility disposal or site stabilization. The objectives of the Waste Area Grouping S M Program are met by maintaining a program of routine S M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program's activities and includes tables indicating tank levels and dry well data for FY 1991.
This Maintenance Implementation Plan (MIP)was developed for implementation of the U.S. Department of Energy (DOE) Order 4330.4A, A Maintenance Implementation Program (DOE 1990) which has been replaced by 4330.4B (DOE 1994) at the Hanford Site SWM complex. It addresses maintenance functions associated with SWM, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for SWM was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The objective of this MIP is to provide baseline information for the control and execution of SWM Maintenance activities relative to the requirements of Order 4330.4B, Chapter II. (Nuclear Facilities) It also ...
The purpose of the work reported in this paper was to measure the radionuclide buildup in primary heat transport system cell No. 3 at the Fast Flux Test Facility (FFTF) and to compare the results with predicted values from a model based on experimental studies and experience at similar reactors. The information obtained is used for maintenance planning and to enhance ability to assess radionuclide buildup in the future at FFTF and in other reactors.
This case study illustrates how an existing building can be transformed into a sustainable, green facility through teamwork. This multi-purpose building comprises office space, combustion testing facilities, and microwave communications center. The paper discusses internal systems design, indoor air quality, commissioning, economics, operations and maintenance, and monitoring.
Task 13 (a) was approved on December 21, 2001. Minimal work was performed for the quarter during the approval process. Laboratory and equipment facilities have been maintained in anticipation of the work to be done. The PI communicated with DOE and Estonia researchers during this period, providing advice and direction for the startup of the Estonia research, and preparing a Draft Teaming Agreement. The PI participated in an industrial liaison meeting with DOE personnel. This meeting is expected to lead to formal cooperation between industry and government.
The United State Domestic Research Reactor Infrastructure Program at the Idaho National Laboratory manages and provides project management, technical, quality engineering, quality inspection and nuclear material support for the United States Department of Energy sponsored University Reactor Fuels Program. This program provides fresh, unirradiated nuclear fuel to Domestic University Research Reactor Facilities and is responsible for the return of the DOE-owned, irradiated nuclear fuel over the life of the program. This presentation will introduce the program management team, the universities supported by the program, the status of the program and focus on the return process of irradiated nuclear fuel for long term storage at DOE managed receipt facilities. It will include lessons learned from research reactor facilities that have successfully shipped spent fuel elements to DOE receipt ...
Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting the joint project integrating both the Neutron Science Project (NSP) of JAERI and the Japan Hadron Facility Project (JHF) of KEK for comprehensive studies on basic science and technology using high-intensity proton accelerator. This document describes the joint project prepared by the Joint Project Team of JAERI and KEK to construct accelerators and research facilities necessary both for the NSP and the JHF at the site of JAERI Tokai Establishment. It was originally written in English and translated into Japanese with some corrections. (author)
This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.
There is a clear incentive, therefore, for early consideration of the measures required to meet noise and vibration standards. The platform or rig owner and the operator are jointly responsible for agreeing a noise and vibration control policy and approach at the conceptual design stage, and for then passing on their requirements to the engineering design teams. The engineering design teams and acoustic and vibration specialists for their part need to use all their skill and judgement to apply that policy to the intensely complex job of designing and fabricating topsides facilities. With these concerns as background, UEG started, and has nearly completed, a two-phase study to provide detailed guidance to project managers and designers to assist them to develop appropriate policy and procedures and to help them put those procedures into practice. This paper describes the development of UEG's study, its application ...
Repair and maintenance for equipment used in the Belchatow brown coal mine and organizational models of repair services in the mine are discussed. Maintenance of earthmoving equipment, spreaders, bucket wheel excavators, loaders and other coal handling equipment, belt conveyors and drive systems for belt conveyors is discussed. Repair shops in the mine also manufacture about 35% of spare parts and elements for equipment used in the mine. Reliability of mining equipment, repairs and repair capacity of the shops are discussed. Organizational models of repair services, equipment used by these services and repair personnel are described. Effects of repair services on operation of the mine are evaluated.
The purpose of this study is to develop the radioisotope tracer technology, which can be used in solving industrial and environmental problems and to build a strong tracer group to support the local industries. In relation to the tracer technology in 1999, experiments to estimate the efficiencies of a sludge digester of a waste water treatment plant and a submerged biological reactor of a dye industry were conducted. As a result, the tracer technology for optimization of facilities related to wastewater treatment has been developed and is believed to contribute to improve their operation efficiency. The quantification of the experimental result was attempted to improve the confidence of tracer technology by ECRIN program which basically uses the MCNP simulation principle. Using thin layer activation technique, wear of tappet shim was estimated. Thin layer surface of a tappet shim was irradiated by proton beam and the correlation between the measured activity loss ...
The purpose of this paper is to relate some of the commonly encountered problems with operational procedures in the nuclear industry and offer practical suggestions for their elimination. The paper is based on recent consultant experience in assisting industry clients with human performance related design and assessment initiatives. Operational procedures are a key part of an integrated system design. Procedures provide the specified instructions for actions people are to undertake in operating a facility to achieve production and safety goals. While organizations continue to make substantial investments in procedure development and maintenance, problems with procedures continue to occur, as evidenced through operating inefficiencies, errors, and events. The paper reviews the role procedures play in facility operations, comments on current development and maintenance practices, discusses the extent of ...
Due to current social and economical framework, in last years many nuclear power plant owners started a program for the Long Term Operation (LTO)/PLIM (Plant Life Management) of their older nuclear facilities. PLIM/PLEX has already been implemented in many countries (USA, Russia, etc.). This process has many nuclear safety implications, other than strategic and political ones. The need for tailoring the available safety assessment tools to such applications has become urgent in recent years and triggered many research actions. In particular, a PLIM framework requires both a detailed review of the features of the main safety programs (Maintenance, ISI, Surveillance) and a complete integration of these programs into the general management system of the plant. New external factors, such as: large use of subcontractors, need for efficient management of spare parts, request for heavy plant refurbishment programs demand for updated techniques in the ...
This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment conducted at Brookhaven National Laboratory (BNL) in Upton, New York, between March 26 and April 27, 1990. The BNL is a multiprogram laboratory operated by the Associated Universities, Inc., (AUI) for DOE. The purpose of the assessment was to provide the status of environment, safety, and health (ES H) programs at the laboratory. The scope of the assessment included a review of management systems and operating procedures and records; observations of facility operations; and interviews at the facilities. Subteams in four areas performed the review: ES H, Occupational Safety and Health, and Management and Organization. The assessment was comprehensive, covering all areas of ES H activities and waste management operations. Compliance with applicable Federal, State, and local regulations; applicable DOE Orders; and ...
The use of robots in powerplants is an option that can no longer be ignored. Robots can reduce worker exposure to harmful environments and minimize downtime. As a result, electric utilities are using them more than ever. As robots become more widely accepted, more are being developed to handle an expanding variety of applications. This report begins with an overview of the use of robotics in the electric-utility industry; following that are sections detailing applications for nuclear plants, fossil-fired stations, and transmission and distribution facilities.
The disordered eating response team developed a protocol for assessment and intervention for athletes who are identified as at risk for disordered eating. Team members included the team physician,...Full Text Available
The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is known as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive management of the research ...
A study was made of employee exposure to oil sludge and vapors during oil-sludge removal and maintenance activities at the Alyeska Pipeline Service Company's Ballast Water Treatment Facility, Valdez, Alaska. Total hydrocarbons, except benzene, toluene, and xylene, showed concentrations from 371 to 1228mg/m3. Of eight maintenance workers, five reported headache, dizziness, or nausea when working without a respirator. The authors conclude that workers were potentially exposed to benzene vapors and total hydrocarbon vapors exceeding the evaluation criteria for these substances. The authors recommend the use of respiratory protection measures to reduce exposures during work operations.
The Fast Flux Test Facility (FFTF) is a liquid-metal-cooled fast reactor, which is designed to test a variety of different structural and fuel materials. A safety analysis is performed for each experiment that is irradiated in FFTF. The FFTF final safety analysis report (FSAR) assumed that all driver fuel assemblies would maintain cladding integrity during normal operations and all design transients. Maintenance of cladding integrity retains three barriers to any fission gas release to the public and also prevents any potential contact between the fuel and coolant. Experiments are, in general, expected to meet the same criterion. Selected experiments can, however, be classified as run-to-cladding-breach experiments (RTCB). The purpose of this paper is to describe alternative acceptance criteria for RTCB experiments that they feel provide protection equivalent to the maintenance of cladding integrity.
This report presents the preliminary findings of the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Idaho National Engineering Laboratory (INEL) and Component Development and Integration Facility (CDIF), conducted September 14 through October 2, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. The team includes outside experts supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the INEL and CDIF. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site ...
The Waste Sampling and Characterization Facility (WSCF) complex consists of the main structure (WSCF) and four support structures located in the 600 Area of the Hanford site east of the 200 West area and south of the Hanford Meterology Station. WSCF is to be used for low level sample analysis, less than 2 mRem. The Laboratory features state-of-the-art analytical and low level radiological counting equipment for gaseous, soil, and liquid sample analysis. In particular, this facility is to be used to perform Resource Conservation and Recovery Act (RCRA) of 1976 and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 sample analysis in accordance with U.S. Environmental Protection Agency Protocols, room air and stack monitoring sample analysis, waste water treatment process support, and contractor laboratory quality assurance checks. The samples to be analyzed contain very low concentrations of radioisotopes. The ...
Scenarios are developed for spent fuel that is taken out of the nuclear reactor and stored for 20 years before reprocessing, and three storage techniques which use a water pool, dry cask or vault are compared with respect to their costs. The storage price (storage cost per kilogram of spent fuel), which is employed as the economic index, is calculated on the assumption that all the charge is paid when the spent fuel is brought in the storage facilities. Four scenarios are assumed for spent PWR and BWR fuels to be stored in at-reactor (AT) or away-from-reactor (AFR) facilities. The capital costs cover the buildings of the storage facilities, equipment, decommissioning, casks for transportation and storage (for cask storage) and casks for transportation (for water pool or vault storage). Costs for operation and maintenance of the facilities are also considered in evaluating these ...
Scenarios are developed for spent fuel that is taken out of the nuclear reactor and stored for 20 years before reprocessing, and three storage techniques which use a water pool, dry cask or vault are compared with respect to their costs. The storage price (storage cost per kilogram of spent fuel), which is employed as the economic index, is calculated on the assumption that all the charge is paid when the spent fuel is brought in the storage facilities. Four scenarios are assumed for spent PWR and BWR fuels to be stored in at-reactor (AT) or away-from-reactor (AFR) facilities. The capital costs cover the buildings of the storage facilities, equipment, decommissioning, casks for transportation and storage (for cask storage) and casks for transportation (for water pool or vault storage). Costs for operation and maintenance of the facilities are also considered in evaluating these ...
The use of deuterium-tritium fuel in the Compact Ignition Tokamak will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion devices auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. In-vessel remote maintenance included replacement of divertor and first wall hardware, faraday shields, and for an in-vessel inspection system. Provision for remote replacement of a vacuum vessel sector, toroidal field coil or poloidal field ring coil was not included in the project baseline. As a result of recent coil failures experienced at a number of facilities, the CIT project decided to reconsider the question of remote recovery from a coil failure and, in January of 1990, initiated a coil replacement study. This study ...
Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. ...
Because of past military operations, lack of upkeep and looting there are now enormous radioactive waste problems in Iraq. These waste problems include destroyed nuclear facilities, uncharacterized radioactive wastes, liquid radioactive waste in underground tanks, wastes related to the production of yellow cake, sealed radioactive sources, activated metals and contaminated metals that must be constantly guarded. Iraq currently lacks the trained personnel, regulatory and physical infrastructure to safely and securely manage these facilities and wastes. In 2005 the International Atomic Energy Agency (IAEA) agreed to organize an international cooperative program to assist Iraq with these issues. Soon after, the Iraq Nuclear Facility Dismantlement and Disposal Program (the NDs Program) was initiated by the U.S. Department of State (DOS) to support the IAEA and assist the Government of Iraq (GOI) in eliminating the threats from ...
This paper presents a rationale for and a summary of tasks and missions to which mobile and stationary robots and other teleoperator-controlled devices could be assigned in response to the accidental release of radioactive and other hazardous/toxic materials to the environment. Many of these vehicles and devices currently support operation and maintenance of nuclear power plants and other nuclear industry facilities. This paper also discusses specific missions for these devices at the Three Mile Island and Chernobyl nuclear power plant sites at the time of the accidents. Also discussed is the status of devices under development for future applications, as well as research on robotics.
The symposium covers papers under different sections namely, (i) Core physics and Fuel management, (ii) Commissioning of facilities and systems, (iii) Operational experience and Human resource development, (iv) Fuel handling, Maintenance management and Surveillance, (v) Instrumentation and Control and Power supply systems, (vi) Analysis, modifications and developments for enhancing operational safety, (vii) Chemistry control and Effluent management, (viii) Radiation and industrial safety and (ix) Steam generators, Turbo-generators and other auxiliaries. Papers relevant to INIS are indexed separately. (author)
Since the PWR plants in Japan have been operated more than 30 years, main instrumentation control equipment of analog systems has been renewed to digital control systems. Renewal works had to be done in short period within periodical inspection term and for several facilities. The Mitsubishi LTD group had been provided with these market needs by its digital control system (MELTAC-NplusR 3) applicable to main instrumentation control equipment for primary and secondary systems and had already finished the renewal for practical plants. (T. Tanaka)
This report summarizes the electricity exchanges between the US and Mexico and Canada during calendar year 1983. The construction, operation and maintenance of any electric transmission facility which crosses an international border of the United States requires a Presidential Permit. These permits have been granted by the Department of Energy (DOE) since its formation in 1977. Between 1953 and 1977, these permits were issued by the former Federal Power Commission. Prior to 1953, they were issued by the President of the United States. Presidential Permits require that an annual report be filed by the permit holder detailing all transactions with the foreign country.
Power Fluidic systems for the control of liquids and gaseous flows have been adopted for use in radioactive processing plants in the UK. These devices are intrinsically reliable with no mechanical moving parts because they are able to make use of the hydrodynamics of the fluids being controlled. This reliability feature leads to a zero cell maintenance concept and the elimination of mechanical drive/control systems in cell. The first phase of the development work led to their use in the Fast Reactor Reprocessing Plant at Dounreay and the Highly Active Liquor Storage facility at Sellafield. The success of these early developments has led to an extensive development programme for an extended range of applications in the Thermal Oxide Reprocessing Plant and its associated waste treatment facilities at Sellafield. The technology has now been fully demonstrated and adopted for these plants with considerable benefit over a wide ...
The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 figs., 2 tabs.
The Fast Flux Test Facility (FFTF) is a 400 Mw(t), loop-type, sodium-cooled, fast neutron reactor. It is operated by the Westinghouse Hanford Company for the United States Department of Energy at Richland, Washington. The FFTF is a multipurpose test reactor used to irradiate fuels and materials for programs such as Liquid Metal Reactor (LMR) research, fusion research, space power systems, isotope production and international research. FFTF is also used for testing concepts to be used in Advanced Reactors which will be designed to maximize passive safety features and not require complex shutdown systems to assure safe shutdown and heat removal. The FFTF also provides experience in the operation and maintenance of a reactor having prototypic components and systems typical of large LMR (LMFBR) power plants. The 5 year operational performance of the FFTF reactor is discussed in this report. 6 refs., 10 figs., 2 tabs.
Preliminary plans for the 90 to 100-MW coal-fired combined cycle plant due to be built by a team headed by Southern California Edison and Texaco in the mid-1980s are reviewed. The basic operating goals call for having a gasifier with a 1,000 ton coal capacity per day feeding a 70-MW turbine which then provides waste heat to run a 30-MW steam turbine. Texaco will have responsibility for the gasifier part of the facility with the turbine-generator vendor charged with providing both gas and steam turbine equipment. If the 100-MW demonstration plant achieves 32 to 33% design efficiency, then a commercial plant with expansion turbines and steam reheat should hit 38% and require 20 to 30% less water than a conventional coal fired plant.
The Linac Coherent Light Source [1] (LCLS) at SLAC National Accelerator Laboratory is preparing for the arrival of its first scientific users in the fall of 2009. LCLS is the world's first free-electron in the spectral range 800-8,000 eV, producing intense, sub-picosecond pulses of Xrays with very high spatial coherence. The accelerator facility has been commissioned in stages, beginning in April 2007 [2] with the injector linac and culminating in December 2008 [3] with the first transport of electrons through the complete beam path. On April 10, 2009, the LCLS Project team was rewarded for years of planning, design, construction, and checkout with a dream-come-true: as undulators were placed on the beam path one-by-one, the laser simply turned on without drama in the course of one hour [4...
The EU-home team is in charge of the R and D related to the ITER baffle first wall. Five small-scale mock-ups, using Be, CFC and W tiles and different armour/heat-sink material joints under development, have been fabricated and thermomechanically tested in FE200 (Le Creusot) and JUDITH (Juelich) electron beam facilities. The small-scale mock-ups have been submitted to thermo-mechanical fatigue tests (up to failure using accelerating techniques). The objective was to determine the performances of the armour material joints under high heat flux cycles. (orig.)
A negative public reaction is expected to oppose plans of the British energy industry to take valuable sites for industrial and commercial projects on the ground that government demand forecasts are too high and that they downplay conservation. The United Kingdom (UK) Department of Energy points out that public inquiry always accompanies energy installations and defends the projections made by producers even though each study emphasizes the demand for its own form of energy. At issue are plans to open 150 opencast coal mines a year to compensate for diminishing oil and gas supplies, onshore drilling by oil and gas exploration teams on nearly 50,000 km/sup 2/, and sites required for onshore pipelines, synthetic natural gas facilities, pumped storage plants, and nuclear power stations and waste management. The sites under discussion raise aesthetic and ecological concerns. (DCK)
The present report describes the study conducted in co-operation with several agencies and organizations from Thailand and covers the energy and electricity requirements and the optimal expansion plans for the power generating system for this country up to year 2011. It is emphasized that the study was carried out by a team of experts from the Electricity Generating Authority of Thailand (EGAT), the National Economic and Social Development Board (NESDB), the National Energy Administration (NEA) and the Office of Atomic Energy for Peace (OAEP), who were fully responsible for all phases of the study, including the production of the present report. The IAEA's responsibility was to provide overall co-ordination and general guidance during the conduct of the study, as well as training and assistance in the implementation and use of the IAEA's computerized planning methodologies on the computer facilities of Thailand. Refs, figs and tabs.
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the ...
... Electric super car triumph for Imperial team as epic journey reaches end of the road The iframe on this page is empty and contains ...Business Media News and Events , imperial, college, london, university, News and Events, Electric super car triumph for Imperial team as epic journey reaches end ...of the road Electric super car triumph for Imperial team as epic journey reaches end of the road Show more news Electric ...super car triumph for Imperial team as epic journey reaches end of the road The Racing Green Endurance team celebrates successful 26,000 km ...
Although past research has reported the benefits of intuition in new product decision-making (i.e., higher quality product; enhanced customer satisfaction), intuition has largely been studied as an individual phenomenon and little work has examined the role of intuition on new product development (NPD) project teams. Furthermore, in a turbulent environment, NPD project teams may rely more on intuitive judgments, and other factors such as experience and stress may also influence the relationship between team intuition and team decision making. Drawing from the organizational design literature on creativity in decision making, this study builds a conceptual model of NPD team intuition and its effect on the team's ability to generate creative new products. We then derive hypotheses regarding ...
Jul 15, 2004 ... Responding to the recommendations of the President's Commission on Implementation of United States Space Exploration Policy, NASA is teaming ...
Team 6 Regimental Combat Team 8 Retired Activities Office Safety Division School of Infantry - East School of Infantry - West Second Low Altitude Air Defense Battalion Security...
This report documents the Mixed Waste Focus Area (MWFA)-sponsored Alternative Technology Workshop held in Salt Lake City, Utah, from January 24--27, 1995. The primary workshop goal was identifying potential applications for emerging technologies within the Options Analysis Team (OAT) ''wise'' configuration. Consistent with the scope of the OAT analysis, the review was limited to the Mixed Low-Level Waste (MLLW) fraction of DOE's mixed waste inventory. The Los Alamos team prepared workshop materials (databases and compilations) to be used as bases for participant review and recommendations. These materials derived from the Mixed Waste Inventory Report (MWIR) data base (May 1994), the Draft Site Treatment Plan (DSTP) data base, and the OAT treatment facility configuration of December 7, 1994. In reviewing workshop results, the reader should note several caveats regarding data limitations. Link-up of the MWIR and DSTP data ...
The fundamental tasks of the Oak Ridge Y-12 Plant maintenance operations are planning, scheduling, executing, postmaintenance testing, completing the maintenance job, and supporting these activities with administrative and technical assistance. The Department of Energy (DOE) ``Maintenance Management Program`` guidelines require that we use a graded approach for applying formality and documentation to these maintenance operations. The most-rigorous controls should be placed on maintaining the most-vital systems, structures, and components (SSCs). We must understand risk assessments in order to evaluate which SSCs are most vital. The product of this assessment process is a well-developed understanding of where to apply the most rigor, formality, and documentation. Once we have determined where, we must determine how to apply maintenance so as to mitigate risk. Fundamental to ...
The saturation of South Korea's at-reactor (AR) spent fuel storage pools will create a necessity for additional spent fuel storage capacity. Because the South Korean government has the plan to increase the number of nuclear power plants from 20 units (end of 2005) to 27 units by 2015, the increase of spent nuclear fuel generation will be accelerated. Because there is no clear national plan for spent nuclear fuel storage and disposal, the utility company (Korea Hydraulic Nuclear Power company) is planning to construct a spent fuel storage facility with 11 000 tHM capacity for Pressurised Water Reactor (PWR). This study is intended to predict the maximum allowable periods when the storage facility will be fully occupied with respect to the already fixed re-racking plan of spent fuel storage pools and construction of new nuclear power plants. The result from this study will be used as fundamental data for an efficient management of the spent fuel ...
There are two major distinct activities involved with reprocessing of nuclear fuel. They are: a) Mechanical handling of the fuel in the head end plants; and b) chemical dissolution and separation of unused fuel, useful by-products and waste products. Plants and facilities associated with the former include significant remote handling equipment that is designed for handling of fuel for normal production processes. These equipment are selected and designed to meet the design throughput of the plant taking into consideration ease of their operation and maintenance in conjunction with statutory regulations on safety and operator dose uptake. Nevertheless, during the life of the plant, there are instances when special equipment is called for to access part of the plant and undertake tasks such as inspection, maintenance and modification to improve the existing process. BNFL has much experience in the design and application of ...
The U.S. Department of Energy`s (DOE) Environmental Management Office of Science and Technology (EM-50) authorized studies on alternative systems for treating contact-handled DOE mixed low-level radioactive waste (MLLW). The on-going Integrated Thermal Treatment Systems` (ITTS) and the Integrated Nonthermal Treatment Systems` (INTS) studies satisfy this request. EM-50 further authorized supporting studies including this technology and subsystem cost sensitivity analysis. This analysis identifies areas where technology development could have the greatest impact on total life cycle system costs. These areas are determined by evaluating the sensitivity of system life cycle costs relative to changes in life cycle component or phase costs, subsystem costs, contingency allowance, facility capacity, operating life, and disposal costs. For all treatment systems, the most cost sensitive life cycle phase is the operations and maintenance phase and the ...
The DOE-Idaho Operations Office (DOE-ID) has prepared an environmental assessment (EA) on the replacement of the Idaho National Engineering Laboratory Health Physics Instrumentation Laboratory at the Idaho National Engineering Laboratory (INEL). The purpose of this project is to replace the existing Health Physics Instrumentation Laboratory (HPIL) with a new facility to provide a safe environment for maintaining and calibrating radiation detection instruments used at the Idaho National Engineering Laboratory. The existing HPIL facility provides portable health physics monitoring instrumentation and direct reading dosimetry procurement, maintenance and calibration of radiation detection instruments, and research and development support-services to the INEL and others. However, the existing facility was not originally designed for laboratory activities and does not provide an adequate, safe environment ...
Bituminization has to be selected as the process for conditioning radioactive liquid wastes arising from the two VVER V-230 reactors being built at Temelin in the Czech Republic. In the process, a thin-film evaporator, operating at a waste-product temperature of 160"oC, evaporates all free water from the waste effluents. Remaining solids are homogeneously dispersed in a bitumen matrix which solidifies through natural cooling of the binder. The relative simplicity of the process reduces construction costs for on-line waste facilities and operating costs are less given the cheap basic material and simple maintenance. The reliability of the process has been demonstrated at Western reactors and reprocessing plants though adaptations have had to be made to accept VVER effluents. (UK).
The first 750 MW block of the new South Humber Bank gas-fired combined cycle power plant, sited about 300 km north from London, was officially commissioned in September 12th 1997. The project has been a major success story for Imatran Voima Oy (IVO), which developed the concept and managed the project and owns 22.5 % of the plant; and ABB Power Plants Limited, responsible for the turnkey delivery. IVO Generation Services (UK) is responsible for the running and maintenance of the facility. IVO also manages two other existing plants in Britain, at Brigg (240 MW) and Peterborough (360 MW)
The first 750 MW block of the new South Humber Bank gas-fired combined cycle power plant, sited about 300 km north from London, was officially commissioned in September 12th 1997. The project has been a major success story for Imatran Voima Oy (IVO), which developed the concept and managed the project and owns 22.5 % of the plant; and ABB Power Plants Limited, responsible for the turnkey delivery. IVO Generation Services (UK) is responsible for the running and maintenance of the facility. IVO also manages two other existing plants in Britain, at Brigg (240 MW) and Peterborough (360 MW).
This paper is focused on TLP and Spar technology as applied to floating production applications. In particular, safety considerations as related to classification and certification requirements are addressed. This covers hull structures, marine systems, production facilities and the relevant mooring systems for each platform type from design approval on through construction, installation and ultimately the ongoing maintenance of the platform to acceptable standards throughout its operating life. The experience of the American Bureau of Shipping with these platforms will be utilized in supporting the practical application of classification and regulatory standards to ensure safe operations and concluding that use of such standards in conjunction with an experienced classification society provides a substantial benefit to companies utilizing these technologies. (author)
A program of tests were conducted in July 1986 at the Fast Flux Test Facility (FFTF) to demonstrate that the reactor could withstand a prototypic loss of flow (LOF) without scram without sustaining fuel damage. The reactor was taken to powers up to 50%, and the main primary coolant pump motors were tripped without scramming the control rods. This paper summarizes the analyses performed to demonstrate the maintenance of redundant protection for all design events as well as potential new events introduced by the test. The analyses focused on the following consequences: (1) unexpected test behavior; (2) transient overpower event during the test; and (3) LOF event during the test.
Since August 1984, the MITRE Corporation has been supporting the Naval Sea Systems Command (NAVSEA) and the Naval Medical Command (NAVMEDCOM) in their joint efforts to enhance the Navy Occupational Health Information Management System (NOHIMS). The goal of the enhancement effort was to create a comprehensive occupational health and safety system for Navy industrial facilities by expanding upon the original NOHIMS functions and adding modules for hazard deficiency abatement, hazardous-material control, injury claims and compensation, and safety and health training. To meet this goal, MITRE developed an enhanced industrial subsystem, referred to as the Occupational Safety and Health Record Keeping System (OSHRKS), using a prototyping approach and a public-domain data base-management software package, the Veterans Administration's (VA's) FileManager (FileMan).
During the first few years of elevated atmospheric [CO2] treatment at the Nevada Desert FACE Facility, photosynthetic downregulation was observed in desert shrubs grown under elevated [CO2], especially under relatively wet environmental conditions. Nonetheless, those plants maintained increased A sat (photosynthetic performance at saturating light and treatment [CO2]) under wet conditions, but to a much lesser extent under dry conditions. To determine if plants continued to downregulate during long-term exposure to elevated [CO2], responses of photosynthesis to elevated [CO2] were examined in two dominant Mojave Desert shrubs, the evergreen Larrea tridentata and the drought-deciduous Ambrosia dumosa, during the eighth full growing season of elevated [CO2] treatment at the NDFF. A comprehen...
Often oil/gas and other hydrocarbons discovered and produced offshore are transported to onshore facilities via submarine pipelines. The route of such pipelines traverses through coastal/shore approach regions. For a rational/economic design, safe installation and subsequent operation it is of utmost importance to review, evaluate and finalize various environmental hazard such as winds, waves, currents, seabed topography, seabed and sub-bottom soils, seabed erosion and soil accretion. This paper addresses the above described environmental hazards, their assessment and techniques to prepare design parameters which must be used for stability analysis, installation methods, long term operation and maintenance for the shore approaches. Additionally, various proven pipeline installation and stabilization techniques for the shore approach region are detailed. As case histories, three approaches installed in the Dutch North Sea are described.
Air toxics from the industrial wastewater treatment plants (IWTPs) impose serious health concerns on its surrounding residential neighborhoods. To address such health concerns, one of the key challenges is to quantify the air emissions from the IWTPs. The objective here is to characterize the air emissions from the IWTPs and quantify its associated uncertainty. An IWTP receiving the wastewaters from an airplane maintenancefacility is used for illustration with focus on the quantification of air emissions for benzyl alcohol, phenol, methylene chloride, 2-butanone, and acetone. Two general fate models, i.e., WATER9 and TOXCHEM+V3.0 were used to model the IWTP and quantify the air emissions. Monte Carlo and Bootstrap simulation were used for uncertainty analysis. On average, air emissions fr...
Both the KRW fluidized-bed gasifier and the transport gasifier case studies were used for this assessment. The transport technology is a high-velocity circulating fluidized-bed reactor currently under development by The M.W. Kellogg Company. In the earlier assessment, seven design concepts or cases were identified; a process design was developed; major equipment items were identified; estimates of capital cost, operation and maintenance cost, and cost of electricity were developed; reliability was predicted; and development issues were identified for six studies. Three of the most probable cases were further evaluated for a Greenfield assessment in this report to adequately determine all costs independent of facilities at Plant Wansley.
Both the KRW fluidized-bed gasifier and the transport gasifier case studies were used for this assessment. The transport technology is a high-velocity circulating fluidized-bed reactor currently under development by The M.W. Kellogg Company. In the earlier assessment, seven design concepts or cases were identified; a process design was developed; major equipment items were identified; estimates of capital cost, operation and maintenance cost, and cost of electricity were developed; reliability was predicted; and development issues were identified for six studies. Three of the most probable cases were further evaluated for a Greenfield assessment in this report to adequately determine all costs independent of facilities at Plant Wansley.
The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.
A computerised gamma scanning facilities for on-line investigation of industrial process columns and vessels has been developed by the Malaysian Nuclear Agency (Nuclear Malaysia). The technology, based on the principle of gamma-ray absorption, has been successfully applied for real-time troubleshooting, process investigation and predictive maintenance of a number of distillation columns and process vessels in petroleum refineries, gas processing plants and chemical plants in the country and the surrounding region. This paper outlines basic characteristics of the system and describes the inspection procedures, and in addition, presents a number of case studies. The case studies are purposely chosen to illustrate the versatility of the technology, and furthermore to demonstrate the economic benefits which can be realised from the application of this technology. (Author)
In compliance with Article 20 of the sustainable radioactive materials and waste management act dated 28 June 2006, the CEA and AREVA are required every three years to revise the cost of decommissioning their facilities and to provide the necessary assets by constituting a dedicated fund. For the 2007 revision the CEA used ETE-EVAL V5. Similarly, AREVA reevaluated the cost of decontaminating and dismantling its facilities at La Hague, as the previous estimate in 2004 did not take into account the complete cleanup of all the structural work. ETE-EVAL V5 is a computer application designed to estimate the cost of decontamination and dismantling of basic nuclear installations (INB). It has been qualified by Bureau Veritas and audited. ETE-EVAL V5 has become the official software for cost assessment of CEA civilian and AREVA decommissioning projects. It has been used by the DPAD (Decontamination and Dismantling Projects Department) cost assessment ...
This report contains the results of the Photovoltaic (PV) Industry Manufacturing Technology Assessment performed by the Automation and Robotics Research Institute (ARRI) of the University of Texas at Arlington for the National Renewable Energy laboratory. ARRI surveyed eleven companies to determine their state-of-manufacturing in the areas of engineering design, operations management, manufacturing technology, equipment maintenance, quality management, and plant conditions. Interviews with company personnel and plant tours at each of the facilities were conducted and the information compiled. The report is divided into two main segments. The first part of the report presents how the industry as a whole conforms to ``World Class`` manufacturing practices. Conclusions are drawn from the results of a survey as to the areas that the PV industry can improve on to become more competitive in the industry and World Class. Appendix A contains the ...
The Savannah River Site is a Department of Energy facility. The facility stores, processes, and works with fissionable material at a number of locations. Technical standards and US Department of Energy orders, require these locations to be monitored by criticality alarm systems under certain circumstances. The Savannah River Site calls such instruments Nuclear Incident Monitors or NIMs. The Sole purpose of the Nuclear Incident Monitor is to provide an immediate evacuation signal in the case of an accidental criticality in order to minimize personnel exposure to radiation. The new unit is the third generation Nuclear Incident Monitor at the Savannah River Site. The second generation unit was developed in 1979. It was designed to eliminate vacuum-tube circuits, and was the first solid state NIM at SRS. The major design objectives of the second generation NIM were to improve reliability and reduce maintenance costs. Ten ...
Test Area North (TAN) was a site of the Aircraft Nuclear Propulsion (ANP) Project of the U.S. Air Force and the Atomic Energy Commission. Its Cold War mission was to develop a turbojet bomber propelled by nuclear power. The project was part of an arms race. Test activities took place in five areas at TAN. The Assembly & Maintenance area was a shop and hot cell complex. Nuclear tests ran at the Initial Engine Test area. Low-power test reactors operated at a third cluster. The fourth area was for Administration. A Flight Engine Test facility (hangar) was built to house the anticipated nuclear-powered aircraft. Experiments between 1955-1961 proved that a nuclear reactor could power a jet engine, but President John F. Kennedy canceled the project in March 1961. ANP facilities were adapted for new reactor projects, the most important of which were Loss of Fluid Tests (LOFT), part of an international safety program for ...
The Fast Flux Test Facility (FFTF) reactor, which started operating in 1982, is a 400 MWt sodium-cooled fast neutron reactor located in Hanford, Washington State, and operated by Westinghouse Hanford Co. under contract with U.S. Department of Energy. The reactor has a wide variety of functions for irradiation tests and special tests, and its major purpose is the irradiation of fuel and material for liquid metal reactor, nuclear reactor and space reactor projects. The review first describes major technical specifications and current conditions of the FFTF reactor. Then the plan for irradiation testing is outlined focusing on general features, fuel pin/assembly irradiation tests, and absorber irradiation tests. Assemblies for special tests include the material open test assembly (MOTA), fuel open test assembly (FOTA), closed loop in-reactor assembly (CLIRA), and other special fuel assemblies. An interim examination and maintenance cell (FFTF/IEM ...
The Fast Flux Test Facility (FFTF) reactor, which started operating in 1982, is a 400 MWt sodium-cooled fast neutron reactor located in Hanford, Washington State, and operated by Westinghouse Hanford Co. under contract with U.S. Department of Energy. The reactor has a wide variety of functions for irradiation tests and special tests, and its major purpose is the irradiation of fuel and material for liquid metal reactor, nuclear reactor and space reactor projects. The review first describes major technical specifications and current conditions of the FFTF reactor. Then the plan for irradiation testing is outlined focusing on general features, fuel pin/assembly irradiation tests, and absorber irradiation tests. Assemblies for special tests include the material open test assembly (MOTA), fuel open test assembly (FOTA), closed loop in-reactor assembly (CLIRA), and other special fuel assemblies. An interim examination and maintenance cell (FFTF/IEM ...
The Fast Flux Test Facility (FFTF) is a 400-MWt, sodium-cooled reactor located on the Hanford Site near Richland, Washington, USA. The FFTF is owned by the U.S. Department of Energy and is operated by the Westinghouse Hanford Company. The FFTF was designed to test fuels and materials for use in liquid metal reactors. Since initial operation in 1982, anticipated breaches of experimental fuel pins have released fission products, including cesium, into the primary sodium. Because of its high volatility, cesium vaporizes into the cover gas space, where it condenses on components and equipment and is transported into the cover gas outlet. Because of the long half-life of "1"3"7Cs, these deposits result in long-term, local radiation levels that make contact maintenance difficult. Thus, a cesium trap was installed in FFTF to reduce the cesium level in the sodium. The trap could also permit a Run Beyond Cladding Breach (RBCB) program without ...
Universal Oil Products, Inc. (UOP) of Des Plaines, Illinois has contracted A.E. Roberts & Associates, Inc. (AERA) of Atlanta, Georgia to prepare a sensitivity analysis for the development of the Fluidized-bed Copper Oxide (FBCO) process. As proposed by AERA in September 1991, development of the FBCO process design for a 500 mega-watt (MW) unit was divided into three tasks: (1) Establishment of a Conceptual Design, (2) Conceptual Design, (3) Cost Analysis Task 1 determined the basis for a conceptual design for the 500 megawatt (MW) FBCO process. It was completed by AERA in September of 1992, and a report was submitted at that time {open_quotes}Establishment of the Design Basis for Application to a 500 MW Coal-fired Facility.{close_quotes} Task 2 gathered all pertinent data available to date and reviewed its applicability to the 500 MW FBCO process. Work on this task was carried out on a joint basis by the AERA team members: Roberts & ...
R and D today is a large industry that consumes vast amounts of public and private funds in most countries. It is becoming increasingly evident that technology transfer and the commercialization of research done at universities and government funded research laboratories must be a key element of their comprehensive strategic plan. It involves using a verified and organized knowledge and research to develop commercially viable products. It requires a visionary leader with effective project management skills to manage and motivate a team of scientists and engineers, otherwise even a top rated researcher will enervate and wither within the walls of research laboratories. This paper will highlight the importance, challenges and techniques of commercializing technology from accelerator research laboratories. It will provide an overview of the requirements of scientific leadership for both commercialization of research and technology, together with some case studies ...
Emergency Departments (ED) are fast-paced, information-intensive environments where patient care team members must address their information needs quickly and accurately. We conducted a qualitative...Full Text Available
System). From collecting terabytes of video footage to tracking the movements of the submarines, this software is essential to the science team as they explore unique structures on...
This paper begins with an introduction to Guangdong Daya Bay Nuclear Power Station (GNPS) and gives a simple introduction to the operations and maintenance documentation system at GNPS. It then will review the maintenance program guidelines base and the associated problems prior to the application of reliability centered maintenance (RCM). How RCM was implemented at GNPS, how the results of RCM analysis were used to optimize the maintenance program and test program, and what is the interface between RCM and the existing maintenance program will be shown. Next, it will show the successful implementation of RCM at GNPS resulted in the following changes: A new understanding of equipment failure challenges operations and maintenance beliefs, maintenance concepts undergo a large change, maintenance program and periodic ...
...2010-07-01 false Loading and haulage equipment; inspection and maintenance... § 77.1606 Loading and haulage equipment; inspection and maintenance. (a) Mobile loading and haulage equipment shall be inspected by a...
Located approximately 350 km east of Newfoundland, on the eastern edge of the Jeanne d'Arc Basin, and approximately 50 km from both the Terra Nova and Hibernia oilfields, the White Rose oilfield is considered the main oil producing basin off the eastern coast of North America. Husky Oil is very active in the region and holds almost 32 per cent net working interest in the Significant Discovery License areas in the Jeanne d'Arc basin. The development of an economically significant oil discovery in the White Rose Significant Discovery Area is being proposed jointly by Husky Oil and Petro-Canada. It is estimated that the project would enable the recovery of an estimated 36 million cubic meters (230 million barrels) of recoverable oil in this area that covers approximately 40 square kilometers. The operators propose to use a ship-shaped floating production, storage and offloading (FPSO) facility which could store up to 135,000 cubic meters (850,000 ...
Circuit breakers are essential components of every type and size of power system, and their maintenance is a matter of prime importance. This article provides a list of typical circuit breaker maintenance routines for each type of insulating medium and each type of breaker mechanism, and offers a number of useful tips to ensure the success of a circuit breaker maintenance program. It also suggests sources of information about maintenance programs for circuit breakers such as the National Electrical Testing Association's Maintenance Specifications, and companies that specialize in this type of service. 3 tabs.
Direct radiological measurements of the mineral content of femoral bone were performed in 13 patients on maintenance dialysis. They were found to be sufficiently sensitive to be used for monitoring,...Full Text Available
As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never ...
This research and development is intended to structure a network centering around a center having systematized high-level maintenance technology, by utilizing the technological infrastructure having been built in local areas, together with element technologies possessed by national and private research institutes, universities and colleges. It is also purposed to establish a new industrial system for maintenance to realize high reliability, high operation rate and low cost in plants in certain areas. The present fiscal year had the following achievements: research and development of a maintenance system, a maintenance model, a maintenance vehicle, damage estimating technology for stationary parts such as piping, an anomaly diagnostic system using acoustic emission, an anomaly diagnostic system using wear particles in lubricant, an anti-wear material using surface modification, a ...
This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S ...
The fundamental tasks of the Oak Ridge Y-12 Plant maintenance operations are planning, scheduling, executing, postmaintenance testing, completing the maintenance job, and supporting these activities with administrative and technical assistance. The Department of Energy (DOE) Maintenance Management Program'' guidelines require that we use a graded approach for applying formality and documentation to these maintenance operations. The most-rigorous controls should be placed on maintaining the most-vital systems, structures, and components (SSCs). We must understand risk assessments in order to evaluate which SSCs are most vital. The product of this assessment process is a well-developed understanding of where to apply the most rigor, formality, and documentation. Once we have determined where, we must determine how to apply maintenance so as to mitigate risk. ...
As part of the work scope set in the French law on high level long lived waste R&D passed in 1991, CEA is conducting a research program to establish the scientific basis and assess the feasibility of long term storage as an option for the safe management of nuclear waste for periods as long as centuries. This goal is a significant departure from the current industrial practice where storage facilities are usually built to last only a few decades. From a technical viewpoint such an extension in time seems feasible provided care and maintenance is exercised. Considering such long periods of time, the risk for Society of loosing oversight and control of such a facility is real, which triggers the question of whether and how long term storage safety can be actually achieved. Therefore CEA commissioned a study (1) in which MUTADIS Consultants (2) and CEPN (3) were both involved. The case study looks into several past and ...
AREVA is the world leader in the design and construction of nuclear power plants, the manufacture of heavy components, and the supply of nuclear fuel and nuclear services such as maintenance and inspection. The Equipment Division provides the widest range of nuclear components and equipment, manufactured at its two facilities in Jeumont, northern France, and St. Marcel, in Burgundy. The St. Marcel plant, set on 35 ha (87.5 acres) near Chalon-sur-Saone, was established in 1973 in a region with a long history of specialized metalworking and mechanical activities to meet the demand for non-military nuclear requirements in France. The site offers two advantages: - excellent facilities for loading and transporting heavy components on the Saone river, - it's proximity to other group sites. Since its completion in 1975, the Chalon/St. Marcel facility has manufactured all the heavy components for ...
MOX fuel for FBR is allowed to contain impurities within several thousand ppm, which means less than 1000 of decontamination factor (DF) in reprocessing is enough for Pu and U recycle use. The Advanced Fuel Recycle proposed by PNC is on this basis. The concept consists of innovations on both MOX fuel fabrication and aqueous reprocessing technologies based on the Purex process and it is believed that successful optimization of fuel cycle interface condition is the key issue to realize the concept. The lower DF such as 1000 can be easily obtained by the simplified Purex flowsheet which has no purification steps. However, new subject arises in MOX fuel fabrication, that is, fabrication is conducted in the shielding cell using equipment which is maintained remotely. A simplified fabrication technology becomes essential to establish the remote maintenance system and is one of the critical path for achieving the Advanced Fuel Recycle. The PNC`s proposal on the advanced ...
The Fast Flux Test Facility (FFTF) is a 400-MW(t) sodium-cooled fast reactor operating at the Hanford Engineering Development Laboratory in Richland, Washington, to conduct fuels and materials testing in support of the US liquid-metal fast breeder reactor program. Startup and initial power testing included a comprehensive series of nuclear and nonnuclear tests to verify the thermal and neutronic characteristics of the plant and to demonstrate its inherent safety features. Extensive reactor core characterization measurements were completed to provide the neutron and gamma spectra, fission rates, and other physics data needed to design and evaluate tests irradiated in the FFTF. A specially designed series of natural-circulation tests was performed to demonstrate the inherent safety features of the plant. Early in 1982 the FFTF began its first 100-d irradiation cycle. Since that time the plant has operated beyond expectations; it achieved a cycle capacity factor of ...
In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada submitted a Development Application (DA) to the Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB) for the White Rose Development. This DA was prepared following the Canada-Newfoundland Atlantic Accord Implementation Act and the Canada-Newfoundland and Labrador Atlantic Accord Implementation Newfoundland and Labrador Act. In December 2001, the C-NLOPB approved the White Rose DA. This document outlined a proposed amendment to the original Development Plan involving an expansion of its White Rose Development in the Jeanne d'Arc Basin on the Grand Bank. The expansion will consist of a subsea tie-back to the Floating Production, Storage and Offloading (FPSO) vessel through the existing Southern Glory Hole (SGH) and utilizing a new glory hole constructed approximately 4 km south of the SGH. The document presented an overview of the development; geology, geophysics and ...
The Tissue Equivalent Proportional Counter (TEPC) was developed to monitor low level neutron exposure rates at working stations in a nuclear fuel fabrication facility. It has proven capable of accurately measuring neutron dose rates at levels from 0.1 to 0.2 mrem/hr. It also calculates the Quality Factor which is of importance in locations where the neutron to gamma ratio may vary significantly and irregularily. The system described is computerized to monitor 100 work locations simulationeously and can be expanded to monitor 384 locations. Neutron dose is accumulated on a real time basis and after the proton drop point is established, dose rate can be read out at any time for the dose accumulated over a specified period of time. The current development program which provides reduced system maintenance, lower detection limits, and improved accuracy is discussed along with examples of measurement data and work experience with the current system.
This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) by the University of Applied Sciences in Lucerne, Switzerland takes a look at the testing facility at the university that is used to test compact ventilation systems. These feature heat-recovery and return-air heat-pumps and are used in housing built to low energy-consumption standards such as the Swiss 'Minergie' and 'Minergie-P' standards. The primary goal is a technically comprehensive testing programme for compact ventilation units with heat recovery and heat pumps, which can nevertheless be carried out at reasonable cost. In addition to thermal and flow measurements, acoustic measurements are also carried out. The authors quote that the overall assessment provided can also include service and maintenance, materials used and possible problems with thermal bridges. The test installation is described and the testing ...
Data which have been collected by Los Alamos National Laboratory waste management for the hydrologic characterization of the subsurface at the low level radioactive waste disposal facility, Area G, are reported and discussed briefly. The data includes Unsaturated Flow Apparatus measurements of the unsaturated conductivity in samples from borehole G-5. Analysis compares these values to the predictions from van Genuchten estimates, and the implications for transport and data matching are discussed, especially at the location of the Vapor Phase Notch (VPN). There, evaporation drives a significant vapor flux and the liquid flux cannot be measured accurately by the UFA device. Data also include hydrologic characterization of samples from borehole G-5, Area G surface soils, Los Alamos (Cerros de Rio) basalt, Tsankawi and Cerro-Toledo layers, the Vapor Phase Notch (VPN), and additional new samples from the uppermost tuff layer at Area G. Hydraulic properties from these ...
Slope stability can be a major problem during the construction of surface facilities. Cutting into existing ground disturbs the mechanics of the surrounding area, which can result in landslides and rock falls. This practical reference gives you the comprehensive information you need for slope stability analysis, suitable methods of analysis with and without the use of computers, and examples of common stability problems and stabilization methods for cuts and fills. It includes detailed discussions of methods used in slope stability analysis, including the Ordinary Method of Slices, Simplified Janbu Method, Simplified Bishop Method, Spencer`s Method, other limit equilibrium methods, numerical methods, total stress analysis, effective stress analysis, and the use of computer programs to solve problems. Chapters include: General Slope Stability Concepts; Engineering Geology Principles; Groundwater Conditions; Geologic Site Exploration; Laboratory Testing ...
The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell is used for the remote disassembly of irradiated fuel and material experiments. The absorber open-test assembly (AOTA) is a 12-m (40-ft)-long instrumented absorber (control-rod-material) test assembly. Its primary purpose is to characterize the FFTF control-rod-material reaction rate during reactor operation. Instrumentation allowed temperature and pressure measurements at various locations in several absorber pins during reactor operation. After residing several months in the reactor, the assembly was transferred to the IEM cell by the closed-loop ex-vessel machine (CLEM) for separation of the irradiated portion of the experiment from the instrument stalk. After separation, the 3.6-m (12-ft)-long assembly was processed through the sodium removal system and shipped off-site for examination. This success allowed the timely completion of a major task on the FFTF ...
This paper presents the experience faced by people who works in PETROBRAS Business Unit (UN-RNCE), located in Rio Grande do Norte Province, Brazil, during the implementation of a pipeline leak detection system. That application involved nine multiphase oil pipelines distributed along several production facilities. Because of the emergency after the leakage that polluted the Guanabara bay and due to the two phases and multi phases pipelines characteristics, the UN-RNCE decided to apply the Pressure Point Analysis (PPA) technology in order to detect leakages. It is a statistical method for leak detection e uses a very simple instrumentation which facilitates the installation and maintenance. However, in order to get the best performance of the system, it is necessary to know thoroughly the whole process and have a fast and reliable SCADA system for long distance communication. Finally it will be shown the test results, the recommendations to ...
The analysis described demonstrates the use of benefit/cost sensitivity analysis in examining the wide range of potential damages and savings associated with converting oil-fired electric utility boilers to burn coal in Florida. This model, for the first time incorporates, in quantitative terms, environmental economic externalities into a benefit/cost ratio sensitivity analysis framework. Five different dose-response estimates of morbidity and mortality costs, property devaluation, and willing-to-pay estimates are used in combination with four acid rain dose-response models to estimate the net present worth of externality costs. The model estimates the net present worth of benefits by incorporating into a dynamic framework all relevant construction, O + M, and fuel costs of converting an electrical generation facility from using oil to coal. These benefits of fuel savings are then weighted against various combinations of externality costs associated with increased ...
The ability to monitor the corrosion degradation of key components in fossil fuel power plants is of utmost importance for Futuregen and ultra-supercritical power plants. Fireside corrosion occurs in the high temperature sections of energy production facilities due to a number of factors: ash deposition, coal composition, thermal gradients, and low NOx conditions, among others. Problems occur when equipment designed for either oxidizing or reducing conditions is exposed to alternating oxidizing and reducing conditions. This can happen especially near the burners. The use of low NOx burners is becoming more commonplace and can produce reducing environments that accelerate corrosion. One method of addressing corrosion of these surfaces is the use of corrosion probes to monitor when process changes cause corrosive conditions. In such a case, corrosion rate could become a process control variable that directs the operation of a coal combustion or coal gasification ...
In this paper, we define, design and test a radiation tolerant autonomous monitoring tool for nuclear embedded applications. The goal of the instrumentation system was to record the values of some parameters such as dose, temperature or vibrations appearing inside the containment building of nuclear power plants. The knowledge of these parameters will be a good help for predictive maintenance of the power plant components. For the design of the monitoring tool, we rely on commercial-off-the-shelf (COTS) low power electronic components to use battery-supplied power. A large amount of components starting from discrete transistors or logic units to memories and micro-controllers was associated to define and design a prototype. We then confirm the environment conditions tolerance estimated to up to 2 kGy of total dose and 80 C for temperature by on-line irradiation experiments for individual components and functions and prototypes. Two different sets of about 60 ...
The Fast Flux Test Facility (FFTF) is a liquid-metal-cooled test reactor located on the Hanford site. A dual computer system has been developed to monitor the reactor cover gas to detect and characterize any fuel or test pin fission gas releases. The system acquires gamma spectra data, identifies isotopes, calculates specific isotope and overall cover gas activity, presents control room alarms and displays, and records and prints data and analysis reports. The fission gas monitor system makes extensive use of commercially available hardware and software, providing a reliable and easily maintained system. The design provides extensive automation of previous manual operations, reducing the need for operator training and minimizing the potential for operator error. The dual nature of the system allows one monitor to be taken out of service for periodic tests or maintenance without interrupting the overall system functions. A built-in calibrated ...
It was recognized from the early days of commissioning of Bruce B that Control Maintenance staff would require a level of expertise to be able to maintain Special Safety Systems in proper running order. In the early 80's this was achieved through hands on experience during the original commissioning, troubleshooting and placing of the various systems in service. Control maintenance procedures were developed and implemented as the new systems came available for commissioning, as were operating manuals,training manuals etc. Under the development of the Maintenance Manager, a Conduct of Maintenance section was organized. One of the responsibilities of this section was to develop a series of Maintenance Administrative Procedures (MAPs) that set the standards for maintenance activities including training.
A one-year technology-transfer project involving ERDA installations and Hawaii consisted of sending teams from the Lawrence Livermore Laboratory on week-long field trips every two months to test the effectiveness of different methods of transferring technology information from federal sources to civilian clients. The team was questioned primarily on non-energy matters, and the energy questions asked related mostly to individuals or small industries. The team responed to all questions and found that a wide range of knowledge was more effective than having a sequence of experts. Hawaiians considered current major ERDA projects to be irrelevant to their needs. The team was most successful on a one-to-one basis because large groups and state agencies tend to be more policy- than action-oriented. Personal followup was considered essential. The team also learned that their visits ...
This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.
... Headquarters Element, Defense Logistics Agency, Support Detachment 3 ... Joint Task Force, Team 6 ... 19th Special Forces Group, Support Element 1 ...
... 7th Joint Task Force Augmentation Team Schwetzingen ... Headquarters 85th Division Training Support, Detach 2 ... 20th Special Forces Company A ...
Background:To encourage evidence-based practice, an Annals of Internal Medicine editorial called for a new professional on clinical teams: an informationist trained...Full Text Available
... For short-warning crises in other regions, Marine Expeditionary Units, the 82nd Airborne Division, Special Operations Forces, and Air Force/Navy ...
Regional Information: Quality of Life Sports and Recreation. Professional Sports Teams. New Orleans Saints - National Football League; New Orleans Hornets ...
that struck Haiti on Jan. 12, paratroopers from the 2nd Brigade Combat Team, 82nd Airborne Division, were on the ground in the capital, Port-au-Prince. As scenes of the...
The IAEA Assessment of Safety Significant Events Team (ASSET) report presents the results of an ASSET team's assessment of their investigation of the effectiveness of the plant for prevention of incidents since 1990 at Zaporozhe nuclear power plant. The results, conclusions and suggestions presented herein reflect the views of the ASSET experts. They are provided for consideration by the responsible authorities in Ukraine. The ASSET team's views presented in this report are based on visits to the plant, on review of documentation made available by the operating organization and on discussions with utility personnel. The report is intended to enhance operational safety at Zaporozhe by proposing improvements to the policy for the prevention of incidents at the plant. The report includes, as a usual practice, the official response of the operating organization as well as of the regulatory body to the ASSET recommendations. ...
... kinematic model for the robots and designed ... theoretic approach for modeling mobile robot teamn formations". ... "UUV teams, control from a biological ...
Jun 16, 2011 ... The research is part of a team effort to help the hardwood sawmill industry automate with computer vision systems, and computer-aided or ...
Healthcare practitioners from around the world responded almost immediately in the aftermath of the 2010 earthquake in Haiti. This article reports on the efforts of an orthopedic trauma team in Haiti...Full Text Available
of Earth Science data and information management capabilities. Dale Schulz/400 . For your exceptional achievement in leading the joint LaRC/GSFC team in ...
Sep 21, 2007... at night," said Glen Cushing of the U.S. Geological Survey's Astrogeology Team and of Northern Arizona University, Flagstaff, Ariz. ...
... WHS- Washington Headquarters Service ... but also with respect to other Joint, National and ... unit of action (UA) combat team or task force is organized ...
Mine rescue teams frequently must fight fires and guard against the propagation of fires or explosions during a rescue and recovery operation. The team's ability to fight fires depends a great deal on hands-on experience with different fire fighting agents and equipment. The team's work includes an assessment of fire conditions, mine fire gases and other potential hazards associated with fire fighting activity. This training module covers the underlying principles of the fire triangle and the different methods for controlling, containing and extinguishing fires in a mine. The manual also covers fire-fighting equipment, considerations involved in a sealing operation and the cause-effect of explosions.
... for team sizes ranging from 2 to 6 robots. ... intercep- tion mission, a robot must overtake a ... of unmanned underwater vehicles (UUV), unmanned aerial ...
... dressing changes and site care, mid-line placement, placement of peripherally inserted central catheters, heparin locks, and patient education. ...
Sep 5, 1996 ... In Haiti, the military deployed a space support team to advise the task force commander on the effective use of space assets, such as the Milstar ...
Cambridge scientists in the late 1980's. This same team, then headed by Professor John Baldwin, built the world's first separated-element optical/infrared aperture synthesis...
... five newly created airborne divisions, 82nd, 101st, 11th ... completed large scale airborne operations in ... Although division-sized airborne operations ...
joint task force (JTF), division (OIV) and regimental combat team (RCT) with ..... Headquarters, Department of the Army. (HQOA), (2010). Field Manual 2-0 ...
The Fast Flux Test Facility (FFTF) is a liquid-metal-cooled, fast neutron test reactor located on the Hanford Site. A dual computer system has been developed to monitor the reactor cover gas to detect and characterize any fuel or test pin fission gas releases. The system acquires gamma spectra data, identifies isotopes, calculates specific isotope and overall cover gas activity, presents control room alarms and displays, and records and prints data and analysis reports. The Fission Gas Monitor System (FGMS) integrates commercially available hardware and software, providing a reliable and easily maintained system. The design provides extensive automation of previous manual operations, reducing the need for operator training and minimizing the potential for operator error. The dual nature of the system allows either system A or B to be taken out of service for periodic tests or maintenance without interrupting the overall system performance. A ...
This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental ...
The Department of Energy (DOE) Subsurface Contamination Focus Area (SCFA) sponsored a technology demonstration of non-traditional in situ vitrification (NTISV) at Los Alamos National Laboratory (LANL). The project team for this demonstration included MSE Technology Applications, Inc., Geosafe Corporation, and LANL. The technology demonstration involved the performance of two large-scale test melts. The first, referred to as the ''cold'' test, was performed on a simulated absorption bed that contained surrogate contaminants. The cold test was conducted in April 1999. The second demonstration, referred to as the ''hot'' test, took place at LANL's Material Disposal Area (MDA) V in April 2000. The hot test was conducted on a portion of an absorption bed that received radionuclide and metal-contaminated wastewater from a laundry facility and a research laboratory from ...
Full text: The site selection process for a near surface repository dedicated for the radioactive waste resulted from the Cernavoda NPP operation and decommissioning started early in 90's. Each site selection stage included the collection of data from specific field and laboratory works as well as the appropriate safety performance evaluation. In order to assess/confirm the performance of the natural barrier of the Saligny site, the radionuclide concentration in the disposal system compartments has been evaluated, as complementary safety indicator of repository. The siting process was made in accordance with national and international regulations and standards and using a conceptual design similar to those used at L'Aube (France), ElCabril (Spain) or Mohovce (Slovak Republic). ANDRAD, the Romanian waste management organization that has continued the siting process in the last three years applied and obtained a partial siting license from CNCAN in 2008. In 2009, ANDRAD has to prepare ...
A High Performance Power System (HIPPS) is being developed. This system is a coal-fired, combined cycle plant with indirect heating of gas turbine air. Foster Wheeler Development Corporation and a team consisting of Foster Wheeler Energy Corporation, Bechtel Corporation, University of Tennessee Space Institute and Westinghouse Electric Corporation are developing this system. In Phase 1 of the project, a conceptual design of a commercial plant was developed. Technical and economic analyses indicated that the plant would meet the goals of the project which include a 47 percent efficiency (HHV) and a 10 percent lower cost of electricity than an equivalent size PC plant. The concept uses a pyrolyzation process to convert coal into fuel gas and char. The char is fired in a High Temperature Advanced Furnace (HITAF). The HITAF is a pulverized fuel-fired boiler/air heater where steam is generated and gas turbine air is indirectly heated. The fuel gas generated in the ...
One hundred and fifty patients requiring maintenance haemodialysis were investigated to determine the incidence and pattern of tuberculosis. Twenty patients were found to have tuberculosis, giving an...Full Text Available
In a group of 32 patients with terminal renal failure the initial hypocalcaemia was corrected after two months' adequate maintenance haemodialysis. In seven patients hypercalcaemia occurred with a...Full Text Available
China’s methadone maintenance treatment program was initiated in 2004 as a small pilot project in just eight sites. It has since expanded into a nationwide program encompassing more than 680...Full Text Available
This paper documents some of the recent uses of robotics for inspection and maintenance activities in Ontario Hydro's nuclear power plants in areas other than fuel channels and steam generators. 7 figs.
The article gives a brief description of the state of the nuclear power engineering in Ukraine and in the world as of today. There are basic organizational and practical actions on scientific and technical maintenance of the Ukraine nuclear power complex presented in the article.
Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. 18 tabs., 17 figs., 13 refs. (Author) .new.
Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have imposed the maintainability of instruments to use effectively. 15 tabs., 14 figs., 14 refs. (Author) .new.
The DGs (Diesel Generators) in NPP (Nuclear Power Plant) has been used for the emergency electric power source to shot down the nuclear reactor safety in case of station blackout. The RCM (Reliability Centered Maintenance) has been applied to DGs for increasing the safety of NPP. The structured defects of DG were not remedied by the improvement of maintenance method. As the first stage of RCM, to find the structured defect, its failure= models were searched and analyzed through the ten year maintenance information. The structured defects such as the air compressor, the lubricating oil pressure, and the insufficient load were the root causes of main failures. The air reservoir reinstallation, the lubricating oil tube modification, the load bank installation, and the qualitative instrumentation were the solutions for the hardware oriented RCM of DGs. There remains the software oriented RCM such as the rejection of useless ...
Transcription factors drive organogenesis, from the initiation of cell fate decisions to the maintenance and implementation of these decisions. The Drosophila embryonic salivary gland...Full Text Available
The measurement of bone loss in patients undergoing maintenance dialysis over a period of two and a half years is reported. The tendency to lose bone is a likely event in renal failure, but depends...Full Text Available
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning missions. Careful logistical and operational planning can optimize the health, performance, and readiness of the working dog while protecting the safety and well-being of the team members working with them. We also offer recommendations for medical treatment of dog bites. PMID:19813342
With the lifting of the top dome of the Windscale (AGR) Advanced Gas-cooled Reactor earlier this year, the decommissioning team has begun to dismantle the heaviest of the reactor components. In defining the tasks involved, the most important criterion was to minimise the radiation exposure expected to be received by the team members. The manager of the WAGR decommissioning project describes the preparation undertaken and the final lifting of the top dome in this article. (author).
This issue of the newsletter on Engineering Design Activities (EDA) for the ITER Tokamak project contains a report on Second International Industries' Liaison meeting which was held in Tokyo on 2-4 April 1997 (by Y. Kaneki, JAIF, Japan); an overview report on the Blanket project (by A. Cardella, I.Ioki (ITER Central Team), W. Daenner (EU Home Team)); and a progress report on microwave reflectometry (by J. Sanchez, Madrid, Spain).
FastBit is a software package designed to meet the searching and filtering needs of data intensive sciences. In these applications, scientists are trying to find nuggets of information from petabytes of raw data. FastBit has been demonstrated to be an order of magnitude faster than comparable technologies. In this brief report, we highlight how we work with a visualization team, a network security team and a DNA sequencing center to find the nuggets in their data.
This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.
This document describes the 2003 SNL ASCI Software Quality Engineering (SQE) assessment of twenty ASCI application code teams and the results of that assessment. The purpose of this assessment was to determine code team compliance with the Sandia National Laboratories ASCI Applications Software Quality Engineering Practices, Version 2.0 as part of an overall program assessment.
This report briefly describes the background to colliery engineering maintenance, past experience in machine condition monitoring within coal preparation and the introduction of condition-based maintenance. A role model scheme has been developed for the introduction of condition-based maintenance into coal preparation plants. The report describes the instrumentation and monitoring methods suitable for application to most mineral processing plants, the use of specialist companies to monitor, gather, process and analyse the information and the actions taken by the colliery. Examples of the benefits of operating such a scheme are given in terms of safety, performance and finance. Other problematical aspects of coal processing are examined which have a direct effect on plant condition and availability.
Vibration of machinery plays an important role in preventive maintenance programs of machinery. It can be applied in different phases ranging from simple to computerized programs. The advantages of applying machine condition monitoring programs are numerous since vibration measurement and analysis leads to the early detection of component deterioration. The cost, savings and some details of the vibration preventive maintenance program are discussed.
This paper describes a maintenance problem in a fusion power plant. The problem is to specify which life limited parts should be replaced when there is an opportunity. The objective is to minimize the cost rate of replacement parts and of maintenance actions while satisfying a power plant availability constraint. The maintenance policy is to look ahead and replace all parts that will reach their life limits within a time called a screen. Longer screens yield greater system availabilities because more parts are replaced prior to their life limits.
As the Operating and Support staffs of the FFTF organization have gained experience, the plant reliability and capacity factors have shown a steadily improving trend. The plant capacity factor for Cycle 4 was 99.5%. It is the purpose of this report to describe the evolution of the maintenance organization at the FFTF site from a general support organization to a technically proficient organization playing a major role in planning and performance of plant maintenance evolutions.
CORAL-I was an experimental, zero-power, fast-spectrum, high-enriched metal uranium reactor that operated from 1968 until 1988 at the former Junta de Energia Nuclear (JEN), CIEMAT at present. The critical measurements performed at the startup of the reactor are being evaluated as part of the International Critical Safety Benchmark Evaluation Program (ICSBEP) and proposed to be included in its 2001 edition. Additionally, the measurement of the mass reactivity coefficient is compared with MCNP4B calculations. This measurement allows one to perform the approach to critical without the need of a previous control rod calibration, thus enhancing the safety of such an approach. This technique can also be applied to other reactor types. CORAL-I (Ref. 1) is a 90% enriched metal uranium reactor domestically designed and manufactured in the experimental facilities of JEN, now CIEMAT, in Madrid, Spain. The enriched uranium was supplied by the International Atomic Energy Agency ...
The goal of this project is to provide materials engineers, chemical engineers and plant operators with a software tool that will enable them to predict localized corrosion of process equipment including fabricated components as well as base alloys. For design and revamp purposes, the software predicts the occurrence of localized corrosion as a function of environment chemistry and assists the user in selecting the optimum alloy for a given environment. For the operation of existing plants, the software enables the users to predict the remaining life of equipment and help in scheduling maintenance activities. This project combined fundamental understanding of mechanisms of corrosion with focused experimental results to predict the corrosion of advanced, base or fabricated, alloys in real-world environments encountered in the chemical industry. At the heart of this approach is the development of models that predict the fundamental parameters that control the ...
The High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory is one of the world's most powerful research reactors. In 1996, one year after the demise of the Advanced Neutron Source Project, the U.S. Department of Energy embarked on an aggressive program to upgrade the neutron scattering facilities at the HFIR. These upgrades, which are now in progress, include the installation of larger beam tubes, a high-performance hydrogen cold source, and additional neutron guides and neutron scattering instruments. An extensive analysis effort was performed over the past 4 yr to support the design of the modified beamlines and new user facilities and to assess the impact of the upgrades on the integrity of the existing reactor system. The results of three of these analyses are summarized here. Specifically, results are presented for analyses related to the design of the new cold neutron source (CNS), the assessment of beam tube changes on ...
With the advent of computer technology, researchers and instructors are attempting to devise computer support for effective collaborative technical writing. In this study, a computer-supported environment for collaborative technical writing was developed. This system (Process-Writing Wizard) provides process-oriented scaffolds and a synchronous online chat room to facilitate real-time collaborative writing practice. It allows multiple students to work synchronously on collaborative writing tasks via the Internet. It also helps develop collaborative writing strategies, such as creating team agendas, brainstorming, creating team outlines, and generating team articles. An experiment was conducted to examine the effect of the system on EFL (English as a Foreign Language) students? collaborativ...
...the School, the research group structure was recently revised and now comprises the following teams: Drug Design and Analysis Pharmaceutics Pharmacy Practice and Policy Pharmacological and Biomedical Science The current structure was designed to take into account the future development of research in the academic area. The ...Discovery, Molecular Modelling, Pharmacology and Molecular Biology) and international recognition (Biological Sciences), which have now been re-organised into the Drug Design and Analysis and Pharmacological and Biomedical Sciences teams. The reorganisation also aimed to improve the research reputation of the other teams. The improvements in ... Email to a friend Print Within this area Drug design and analysis Pharmaceutics Pharmacy practice and policy Pharmacological and biomedical sciences Projects Publications Staff Considering a course? Research Degrees Course Finder Order a Prospectus Subject ...
KEPCO (Korean Electric Power Corp.) with the support of AECL and other Korean and Canadian subcontractors has created a strong multi-company team to execute design and construction of the Wolsung-2 CANDU 6 power plant. Key concepts of the project team are: 1. KEPCO is the project manager, and AECL is the major engineering and supply contractor; 2. Significant participation by Korean companies in design work in Canada and Korea; 3. Significant manufacturing in both Canada and Korea; 4. Construction by Korean contractors. Key concepts of the Wolsung 2 design are: 1. Evolutionary improvement of the Wolsung-1 plant which balances proven technology and necessary design improvements including current codes and standards. 2. Sharing some structures with the Wolsung-1 plant. This paper describes the successful establishment and operation of the complex project interfaces along with the current project status and plans.
PETROBRAS/TRANSPETRO Pipelines and Terminals has 500 regular employees and 5.064 out sourced workers in its Southeast Division. The out sourced employees work through 125 contracts involving a wide range of activities such as maintenance, operational, pipeline launching , engineering, administrative and auxiliary services. Among these workers, 200 people are subjected to benzene occupational exposure, which might be present in the products we transport in our pipelines. Benzene is recognized as a carcinogen according to ACGIH and Brazilian Ministry of Labour regulation NR- 15. Exposure to benzene in an uncontrolled way, be it chronic or sharp, may affect the worker's health such as: hematological alterations, neoplasys, neurobehavior alterations. Our program PPEOB (acronym in Portuguese for benzene occupational exposure prevention program) involved the work force and fosters health by anticipation, recognition, evaluation and control of the situations that ...
While underground power transmission lines have become to use CV cables as the mainstream, existing facilities still use OF cables. Factors of OF cable deterioration include heat cycles during operation and surge intrusion. As a method to diagnose this deterioration in insulation, characteristics tests are performed by collecting insulation oil in a cable connection box. The insulation oil collection work has been done conventionally with the power line stopped to prevent danger from induction voltage. A power uninterruptible oil collection tool was developed recently. The tool consists mainly of an insulator made of epoxy resin, wherein a connection box connector is rotated and loosened by operating an insulating operation rod, with the structure not contacted directly with metallic sheath, so that insulation oil can go through the oil collecting tool and gets collected. Discussions were given on the tool to be capable of collecting samples for analyzing water ...
This document presents a conceptual design for a contingency interim measure (IM) for treatment of the public water supply system at Barnes, Kansas, should this become necessary. The aquifer that serves the public water supply system at Barnes has been affected by trace to low concentrations of carbon tetrachloride and its degradation product, chloroform. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory (Argonne 2008a) have demonstrated that groundwater at the Barnes site is contaminated with carbon tetrachloride at concentrations exceeding the Kansas Tier 2 risk-based screening level (RBSL) and the EPA maximum contaminant level (MCL) of 5.0 {micro}g/L for this compound. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) formerly operated a grain storage facility in Barnes, approximately 800 ft east-southeast of the public water supply wells. Carbon tetrachloride was used in the treatment of grain. ...
To many, recent developments in electric markets are perplexing. Competition has appeared, often in the form of new players who do not own and operate generation or transmission facilities. Yet, these players happily enter into contracts obliging them to make or take delivery of power at set prices for months or even years into the future. They seem unconcerned about predicted capacity shortages, fuel price uncertainty or unpredictable plant outages. For the most part, these new players understand these risks quite well. They simply believe in the efficacy of markets. Until recently, price ensured recovery of cost. They foresee a true market where price makes supply equal demand and cost is not a factor in the short term at least. The appearance of such players is an augury of the new industry structure, one in which specialists in taking and managing distinct business risks evolve from within or enter from outside. They take and manage price risk in much the same ...
Oct 20, 1997 ... The following requirements apply to the solar array: ..... housings will be coated with material meeting the program's outgassing requirements. ... The solar array temperature testing requirements will be determined by analysis. .... The ADS also generates attitude products for the project and science team. ...
... 4. Military Working Dogs iMWDs). As used in this Instruction refers to drug detector dogs only. 5. Military Working Doq Executive Agent M(WJDEMA. ...
Environmental Protection Agency Energy Management and Conservation Program ...Environmental Protection Agency Office of Administration and Resources Management 1200 Pennsylvania Avenue, NW (3101A) ...MANAGEMENT AND ADMINISTRATION 7 Energy Management Infrastructure 7 Senior Agency Official and Energy Team 7
OBJECTIVE: The objective was to define and characterize the costs associated with trauma care at a level I trauma center. Once the costs were identified, attending physician-led teams were designed...Full Text Available
This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment of the Lawrence Berkeley Laboratory (LBL) conducted from January 14 through February 15, 1991. The purpose of the assessment was to provide the Secretary of Energy with the status of environment, safety, and health (ES H) programs at LBL. The Tiger Team concluded that curtailment of cessation of any operations at LBL is not warranted. However, the number and breadth of findings and concerns from this assessment reflect a serious condition at this site. In spite of its late start, LBL has recently made progress in increasing ES H awareness at all staff levels and in identifying ES H deficiencies. Corrective action plans are inadequate, however, many compensatory actions are underway. Also, LBL does not have the technical expertise or training programs nor the tracking and followup to effectively direct and control sitewide guidance and ...
This is a retrospective study of the development of the social worker role within the multi-disciplinary team setting of the Accident and Emergency (A&E) Department at Burnley General Hospital...Full Text Available
NASA needed a way to safely strip old paint and thermal protection material from reusable components from the Space Shuttle; to meet this requirement, Marshall Space Flight Center teamed with United Technologies' USBI Company and developed a stripping sys...
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning mi...
car running down the track." Choosing to focus on the design of a hydrogen fuel cell model car rather than a solar race car was a deliberate decision for team, "Larry the...
Jun 28, 2000 ... Right now, my biggest project is working with students. ... RE: [Joni- JoniHarbottle/stilwellMiddleSchool] I have 2 dogs, ... you have to go through the military or any other special services to be the payload scientist? ...
Feb 24, 2000 ... NASA computer experts have been using a supercomputer to improve the NASA/ DeBakey miniature heart assist pump, leading to on-going human ...
provides global ocean-surface wind fields with more structures than numerical weather prediction (Geophys. Res. Lett., Vol 25, No. 6, 761-764). The NSCAT data sets was produced...
ObjectiveMany hospitals utilize antimicrobial management teams (AMTs) to improve patient care. However, most function with minimal computer support. We evaluated the effectiveness...Full Text Available
AimTo assess the progression of bronchial reactivity (BR) and incidence of bronchial hyperreactivity (BH), exercise‐induced bronchoconstriction (EIB) and asthma in triathletes...Full Text Available
... different personal wellness goals for you. HIV Health Management With a good medical team and a desire to reach wellness goals , people with HIV can have a virtually normal lifespan. Take the HIV Wellness Quiz Test your knowledge and find out where you need to learn ...
situ by isolating portions of the building envelope and performing tests .MAXIMUM ALLOWED LOAD ...and shall identify commissioning team members who will perform testing and prepare documentation.The commissioning agent may be
XMRV or xenotropic murine leukemia virus-related retrovirus, a recently discovered retrovirus, has been linked to both prostate cancer and chronic fatigue syndrome (CFS). Recently, the teams of Drs....Full Text Available
Cyberspace and its associated operations present both opportunities and challenges for military and United States Government decision-makers and planners. The Pentagon has formally recognized cyberspace as a domain of warfare. Cyberspace is man-made, dyna...
on the picture will download the highest resolution version available. M51: Cosmic Whirlpool Credit: S. Beckwith (STScI) Hubble Heritage Team, (STScI/AURA), ESA, NASA...
on the picture will download the highest resolution version available. M51: Cosmic Whirlpool Credit: S. Beckwith (STScI) Hubble Heritage Team, (STScI/AURA), ESA, NASA...
Six patient assessment systems that have explicit decision rules for replicating team judgments on level of care patient placement were selected for analysis. The six were selected because of their...Full Text Available
...8Eligibility Criteria: Emotional/Behavioral Disorders Guidance for Paragraph...at-risk for emotional/behavioral disorders and their parents to help...Evaluation Team for Emotional/behavioral Disorders: Psychologist,...
The South White Rose oilfield, offshore Newfoundland, owned jointly by Husky Oil (82.5 per cent ) and Petro-Canada (17.5 per cent) is being developed using a floating production storage and offloading (FPSO) system. Some industry stakeholders claim that the oil should be produced using a concrete gravity base system as used in the Hibernia Field. However, Husky Oil officials are confident that the choice of the FPSO is well justified, based on its cost effectiveness and economic viability. Several production facility options have been assessed, taking into account feasibility, deliverability, economic attributes. risk and safety . The assessment results clearly pointed to FPSO as the preferred system based on its commercial and technical flexibility, proven track record in harsh environments, its ability to produce both oil and gas in sequential development, its promise of production at full capacity earlier than a gravity base system, and easier decommissioning ...
The University of California at Los Angeles (UCLA) participated in a U.S. Nuclear Regulatory Commission research program to investigate methods to measure the effect of management and organization on nuclear plant safety. The UCLA research team focused its efforts on understanding {open_quotes}deep technical knowledge,{close_quotes} and its relation to probabilistic risk assessment. As a result, the research team combined deep technical knowledge with a commonly used rating system for understanding the effectiveness of management and organizations.
What makes teamwork tick?. Cooperation matters, in daily life and in complex applications. After all, many tasks need more than a single agent to be effectively performed. Therefore, teamwork rules!. Teams are social groups of agents dedicated to the fulfilment of particular persistent tasks. In modern multiagent environments, heterogeneous teams often consist of autonomous software agents, various types of robots and human beings. Teamwork in Multi-agent Systems: A Formal Approach explains teamwork rules in terms of agents' attitudes and their complex interplay. It provides the first comprehe
A scant body of literature addresses competencies needed for successful job development. This study aimed to identify competencies needed for this role. In this analysis, we observed employment specialists identified as successful in helping consumers obtain employment perform job development duties. We supplemented observations with interviews. Employment specialists possessed competencies in six domains: time management, advocacy, building partnerships with consumers, working as part of a team, face-to-face communication, and networking. The conceptual framework derived from this study can inform supported employment supervisors and researchers about the competencies that can strengthen supported employment teams.
The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise ...
Electric utilities are actively seeking ways of optimizing the economics of their operations by improving productivity and reducing time and money spent on maintenance. Iberdrola, a Spanish utility, is using advanced machine condition-monitoring technology to centralize control and maintenance of its hydropower projects as a means of achieving those goals. The company is using a blend of technologies to supervise their projects from a regional control center. The monitoring scheme makes use of data from on-line, machine-condition monitors, displays from in-plant audio asnd video equipment, and analysis from the control center`s SCADA system.
This paper experimentally evaluates the effects of applying autonomic management to the scheduling of maintenance operations in a deployed Chord network, for various membership churn and workload patterns. Two versions of an autonomic management policy were compared with a static configuration. The autonomic policies varied with respect to the aggressiveness with which they responded to peer access error rates and to wasted maintenance operations. In most experiments, significant improvements due to autonomic management were observed in the performance of routing operations and the quantity of data transmitted between network members. Of the autonomic policies, the more aggressive version gave slightly better results.
Telomere maintenance is essential for cellular immortality, and most cancer cells maintain their telomeres through the enzyme telomerase. Telomeres and telomerase represent promising anticancer...Full Text Available
The paper gives an introduction to reliability assessment of reliquefaction systems for boil-off gas (BOG) on LNG carriers with focus on redundancy optimization and maintenance strategies. The reliability modeling is based on a time-dependent Markov approach. Four different system options are studied, with varying degree of redundancy. Failures in the reliquefaction system may require flaring of the BOG, and the associated cost is compared with the cost of introducing redundancy and the cost of onboard maintenance. A model for maintenance optimization is developed and exemplified on a main unit of the reliquefaction system. Reliability and maintenance cost data for reliquefaction systems on LNG ships are very scarce. The input data have been collected from the best available data sources and adjusted by expert judgement. A tailor-made computer program has been developed and may be supplied to interested ...
Regulatory T cells are proposed to play a central role in the maintenance of immunological tolerance in the periphery, and studies in many animal models demonstrate their capacity to inhibit inflammatory...Full Text Available
The steam generator inspection and maintenance device has an articulated arm formed at least by two rigid segments connected by a pivot and two plates on the ends of the arms by articulated joints which enable them to rotate about two orthogonal axis. One of the axis is parralel to the axis of the pivot between the arm sections while the other is perpendicular to the surface of the corresponding plate. Each of the plates carries coupling elements which are able to engage with the perforations of the heat exchanger tube plates and also a support for a maintenance tool.
There is now an acute need to optimize maintenance to improve both reliability and competitiveness of nuclear power plant operation. There is an increasing tendency to move from the preventive (time based) maintenance concept to one dependent on plant and component conditions. In this context, various on-line and off-line condition monitoring and diagnostics, nondestructive inspection techniques and surveillance are used. Component selection for condition based maintenance, parameter selection for monitoring condition, evaluation of condition monitoring results are issues influencing the effectiveness of condition based maintenance. All these selections of components and parameters to be monitored, monitoring and diagnostics techniques to be used, acceptance criteria and trending for condition evaluation, and the economic aspect of predictive maintenance and condition monitoring ...
Chaperones (stress proteins) are essential proteins to help the formation and maintenance of the proper conformation of other proteins and to promote cell survival after a large variety of environmental...Full Text Available
Internationally, on-line maintenance (OLM) of nuclear power plants under the operation is prevailed to enhance nuclear safety and economics. In recent years, Korea Hydro and Nuclear Power Co. Ltd. (KHNP) is eager to apply OLM. Ministry of Education, Science and Technology (MEST) has established the related technology development program as an item of 'Overall Planning on Nuclear Safety(2010-2014)' through acceptance to the request of KHNP in 2009. OLM is defined as maintenance that is performed with the main generator connected to the grid. In other words, it means a preventive maintenance to be implemented during the allowable outage time (AOT) with ignoring inoperability of safety-related equipment listed in the technical specifications. The Korea Institute of Nuclear Safety (KINS) is developing the assessment technology of safety concerns for OLM under the auspices of MEST. Draft regulatory rule-making for OLM is devised ...
Bone integrity and mineral status were studied with a noninvasive method in uremic patients with severe secondary hyperparathyroidism undergoing maintenance hemodialysis.
The role of apoptosis or programmed cell death in the regulation of development and maintenance of homeostasis in multicellular organisms is well established. During the last decade, naturally...Full Text Available
A set of computer programs is described which constitutes a clone database management system. Maintenance of the database and the stocks of material is designed to be under the control of one person...Full Text Available
Maintenance of power stations so far operated on the concept of using or extending the expected service life of a machine or plant as far as possible in order to avoid early and costly replacement. This was done by means of time-oriented maintenance, inspection and repair, otherwise called preventive maintenance. A European study on maintenance methods totals the cost of these measures at between 140 to 200 billion DM. One way of reducing these costs is 'predictive maintenance'. Estimated savings are about 8 percent or between 12 and 16 billion DM per year. Predictive maintenance identifies irregulaties of machine parts at an early point in time by means of condition monitoring and can help to cut costs: unplanned repairs can be avoided; repairs can be fitted into production schedules; production will not be disturbed to to unforeseen repairs, ...
The staff of the Southwest Technology Development Institute (SWTDI), in conjunction with the staff of Industrial Solar Technology (IST), have analyzed the performance, operation, and maintenance of a large solar process heat system in use at the 5,000 inmate California Correctional Institution (CCI) in Tehachapi, CA. This report summarizes the key design features of the solar plant, its construction and maintenance histories through the end of 1991, and the performance data collected at the plant by a dedicated on-site data acquisition system (DAS).
Allianz Global Corporate and Specialty AG, the industrial insurance carriers of Allianz Group and AZT Risk and Technology GmbH, have a lot of experience and a comprehensive database about damage of industrial steam turbines and large-scale power generation turbosets. Sound maintenance concepts are the main loss prevention measure, which will be presented and discussed in detail. Some modifications and additions to existing maintenance concepts are also provided.
The requirements are given as placed on the development, procurement, maintenance, and application of software for the creation or processing of data during the design, construction, operation, repair, maintenance and safety-related upgrading of nuclear power plants. The verification and validation processes are highlighted, and the requirements put on the software documentation are outlined. The general quality assurance principles applied to safety analyses are characterized. (J.B.). 1 ref.
Many electric power utilities are currently employing machine condition monitoring technologies as a means of reducing forced outages and controlling repair costs. These condition monitoring technologies are a set of {open_quotes}tools{close_quotes} to help maintenance and operations personnel identify and repair machinery problems before catastrophic failure occurs. In this way, the analysis of this data becomes a vital link in the daily operation of the plant. Machinery vibration analysis, machinery balancing and alignment, motor current testing, periodic thermography surveys, analysis of lubrication oil samples, performance monitoring, chemistry monitoring, ultrasonic leak detection surveys, and non-destructive inspections are some of the technologies available to perform this condition monitoring. However, even for a small or medium size plant, the sheer volume of data provided by applying all or some of these technologies can be staggering, not to mention the ...
Two patients receiving maintenance dialysis therapy developed osteonecrosis, the first in the humeral head and the second in the talus. Both patients lacked known risk factors for developing osteonecrosis. A possible pathogenic role of secondary hyperparathyroidism in this disorder is suggested. Rheumatologists evaluating patients receiving maintenance dialysis with rheumatic manifestations should be aware of this potential complication. PMID:2185360
In response to severe maintenance problems caused by the highly corrosive toxic and radioactive substance used in the nuclear reprocessing industry, AEA Technology (formerly the United Kingdom Atomic Energy Authority) has developed a series of power fluidics devices with no moving parts. These maintenance-free devices are described in this article which also explores applications in fields outside their original brief. (UK).
ANCAP (Government's Oil Company of Uruguay) owns a 4000 DWT oil coastal tanker which is mainly used for oil transport in the River Plate, Uruguay and Parana rivers. Availability of the ship is critical because of shortage of available vessels in the region. Full maximum draught of the vessel is 4m , so it can navigate in very shallow waters as it is the case of some places in the Uruguay and Parana rivers. Although the ship was built in 1979, it is a complete double hull, powered by two twin main engines and propellers. Since 1994, several changes in maintenance management have been introduced, in order to increase the availability, thus increasing the total oil volume yearly transported. These changes affected several maintenance items and they also included a modification in the design of part of the cargo tank floors of the ship. As a result of these changes, an increase of 60% of the oil derivatives volume transported yearly was ...
This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings.
All the tests have been finished up in the Waste Management and Disposal Facility which has been used for the safety tests of solidified radioactive waste on sea dumping disposal. The decommissioning of this facility was performed for use of radioisotopes. This report describes the plan on decommissioning of facility for use of radioisotopes, the contamination checking methods and measurement of radioactivity, the fore case and practice for amount of generated radioactive wastes, the operation procedures for dismantlement, the safety measures, the expenses for decommissioning and so on. (author)
This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy's (DOE) Los Alamos National Laboratory (LANL), conducted March 29, 1987 through April 17, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the LANL. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the LANL, and ...
Value Engineering (VE) is a problem solving methodology that has been used in manufacturing and construction industries for fifty years to improve products, systems and projects while reducing unnecessary cost. A Process Waste Assessment (PWA) is a newly developed methodology designed to characterize waste streams and identify opportunities to reduce or eliminate waste generation. The VE and PWA methodologies are compared to show their general similarities and specific differences, and to suggest how VE can be woven into the PWA methodology. Further, the roles of the VE and PWA team leaders and their training are compared; suggestions are made to help enable the PWA team leader to more effectively lead a group-centered creative process. Examples of how VE has been used in hazardous and radioactive waste minimization and pollution prevention projects are presented, also.
As in all vehicles of this type, low weight and aerodynamic drag must be achieved without compromising safety, and in an extremely rugged structure. This has been done by using a chrome-molybdenum steel space-frame, surrounded by a Kevlar/foam sandwich body shell. The solar panel wing, which uses a laminar flow section to obtain low drag, does not tilt except when the vehicle is stationary. A high degree of redundancy is built into the vehicle; for example there are two motors and transmissions, the solar array is divided into seven parallel sub-arrays, and the power electronics is multiply redundant. Built entirely in the garage of a suburban house, the Australian Geographic Team Marsupial car cost less than US$50,000 to construct.
Purpose - The purpose of this paper is to interview Paula Kaufman, Dean of Libraries, to help better understand return on investment (ROI) and the increasing importance of demonstrating our value, as libraries, as librarians, indeed, as public service librarians. Design/methodology/approach - During 2007, a small project team was assembled to develop a model that would calculate a return on investment to an institution for its library. The team consisted of Chrysanne Lowe and Kira Cooper from Elsevier, Paula Kaufman from UIUC, Judy Luther of Informed Strategies, and Dr Carol Tenopir from the Center for Information and Communication Studies at the University of Tennessee, Knoxville. Findings - The results of this groundbreaking study were reported early this year in a white paper entitled, ...
This report presents the preliminary findings of the first phase of the Environmental Survey of the US Department of Energy's (DOE) National Institute for Petroleum and Energy Research (NIPER), conducted February 29 through March 4, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Team members are being provided by private contractors. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NIPER. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at NIPER and interviews with site personnel. ...
This studys purpose was to explore the relationship between creativity and integrity in the ideation phase of feature filmmaking. Integrity refers to ones self-defined ability to maintain authenticity and moral autonomy while preserving ones sense of membership and loyalty to the team or organization. When team members choose elements for the screenplays story that they feel will attract the ideal audience, the dynamic tension between creativity and integrity is most apparent. The forces at play during this phase of work yielded the research question: In what ways and to what degree do screenwriters andor studio executives feel their personal integrity is in alignment with the creative process of feature film development? Several concepts from the literature formed the design around which ...
Abstract Carbon climate, like other environmental sciences, has been changing. Large scale synthesis studies are becoming more common. These synthesis studies are often conducted by science teams that are geographically distributed and on data sets that are global in scale. A broad array of collaboration and data analytics tools are now available that could support these science teams. However, building tools that scientists actually use is difficult. Also, moving scientists from an informal collaboration structure to one mediated by technology often exposes inconsistencies in the understanding of the rules of engagement between collaborators. We have developed a scientific collaboration portal, called fluxdata.org, which serves the community of scientists providing and analyzing the globa...
Sewage waste disposal facilities in the Florida Keys include septic tanks and individual package plants in place of municipal collection facilities in most locations. In Key Largo, both facilities discharge...Full Text Available
The discussion of energy usage falls naturally into three parts. The first is a review of what the problem is, the second is a description of steps that can be taken to conserve energy at existing facilities, and the third is a review of the implications of energy consumption on future facilities.
In Korea, the Proton Engineering Frontier Project (PEFP) is building a proton linear accelerator facility with energy up to 100MeV and a beam current of 20mA. In this study, a radiation field after shutdown in the accelerator facility of the PEFP was evaluated for the purpose of the radiation shielding by using MCNPX code. A facility modeling was performed for the accelerator tunnel building, accelerator chain, target rooms and beam experiment hall. And radiation source terms were evaluated in the facility. With this facility, model and radiation source terms, the concentration of 41Ar was evaluated and the cooling time satisfying regulation in Korea was calculated.
Based on empirical research within the aviation industry we have come to some surprising and sometimes counterintuitive conclusions concerning aircraft maintenance that are relevant for the discussion of social theory and its application towards the explanation and management of socio-technical systems. In this article, the human role in the activity of aircraft maintenance is taken as an example to illustrate the need for critical discussions on social theory in order to better understand safety in socio-technical systems This challenges us to consider the theoretical basis related to how we currently approach the human factor in management of such systems. We propose in the article that Roy Bhaskars' book ?The possibility of naturalism?a philosophical critique of the contemporary human s...
The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Spent fuel: myths and facts, by Jeffrey S. Merrifield, U.S. Nuclear Regulatory Commission; Critical pipe replacement procedure, by Geoff Gilmore, Climax Portable Machine Tools Inc.; Improving maintenance performance, by Larry Meyer and Joe Giuffre, DC Cook Nuclear Plant, American Electric Power; Equipment deficiency intolerance index, by Douglas F. Helms, Tennessee Valley Authority; Plant profile: I and C modernization at Dukovany, by Josef Rosol, CEZ Dukovany NPP, Czech Republic; and, Report: new plant activities.
This report presents the results of a study on Operation and Maintenance (O M) practices in hydroelectric pumped storage plants. The objective of this project, which was sponsored by EPRI, is to record the practical knowledge on the O M of a number of the domestic and foreign pumped storage plants which has been accumulated by their operating staff. Civil, geotechnical, mechanical and electrical aspects of O M of the thirty-five plants visited are discussed, and some general conclusions, as warranted by the commonality of the problems, are drawn. These conclusions may be useful to the planners and designers of future pumped storage projects. In general, due to their layout, diversity and different modes of operation, the plants have few common problems which, in most cases, are limited to the mechanical and electrical aspects of the plants' operation. The data on plants' specifications, operation and maintenance were collected ...
Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.
Daya Bay Nuclear Power Plant is put into commercial operation in 1994 Until 1996, there are 368 human error events in operating and maintenance area, occupying 39% of total events. These events occurred mainly in the processes of maintenance, test equipment isolation and system on-line, in particular in refuelling and maintenance. The author analyses root causes for human errorievents, which are mainly operator omission or error procedure deficiency; procedure not followed; lack of training; communication failures; work management inadequacy. The protective measures and treatment principle for human error events are also discussed, and several examples applying them are given. Finally, it is put forward that key to prevent human error event lies in the coordination and management, person in charge of work, and good work habits of staffs.
This issue is the collection of the papers on progress of researches by common utilization of JAERI nuclear facilities. The 43 of the papers are indexed individually. (J.P.N.)
This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.
The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not ...
Somite boundary formation is crucial for segmentation of vertebrate somites and vertebrae and skeletal muscle morphogenesis. Previously, we developed a Tol2 transposon-mediated...Full Text Available
Between 1970 and 1975, the incidence of new Schistosoma mansoni infections was reduced in 5 villages after each household was provided with its individual water supply and community...Full Text Available
This report describes a quality assurance program plan for the Yucca Mountain Project. Aspects of the plan include: document control, equipment maintenance and calibration, process control, audits, computer software, and inspections. (CBS)
The mini-chromosome maintenance proteins Mcm2–7 are essential for DNA replication. They are loaded onto replication origins during G1 phase of the cell cycle to form a pre-replication complex...Full Text Available
The formation and maintenance of social bonds in adulthood is an essential component of human health. However studies investigating the underlying neurobiology of such behaviors have been scarce....Full Text Available
The electric explosion of a conductor being part of an electric cable is studied. It is ascertained that the electric properties of a polymeric dielectric depend nonlinearly on the maintenance of the ultradisperse metal filler. In the course of the numerous heating-cooling processes of an insulator, a streamlining of the structure of a polymeric composite occurs.
The growth regulating factor CTGF/CCN-2 is an integral factor in growth and development, connective tissue maintenance, wound repair and cell cycle regulation. It has recently been reported that CTGF/CCN-2...Full Text Available
The development of a high power density sodium sulphur battery with a five-year maintenance-free life is described. These batteries are likely to be used in industrial trucks, milk floats, electric cars, storing power station output and power for satellites. (U.K.).
It has become increasing clear that alterations in cellular metabolism have a key role in the generation and maintenance of cancer. Some of the metabolic changes can be attributed to the activation...Full Text Available
The processes regulating telomere function have major impacts on fundamental issues in human cancer biology. First, active telomere maintenance is almost always required for full oncogenic transformation...Full Text Available
A HydroSele S seal from James Walker has provided more than two years maintenance-free service at the large Entracque pumped-storage hydroelectric scheme in Italy.
Yeast Sir2 deacetylase is a component of the silent information regulator (SIR) complex encompassing Sir2/Sir3/Sir4. Sir2 is recruited to telomeres through Rap1, and this complex spreads into subtelomeric...Full Text Available
A number of studies have indicated that plasma membrane calcium ATPases (PMCAs) are expressed in the brain and spinal cord and could play important roles not only in the maintenance of cellular calcium...Full Text Available
Stem cells are expected to play a key role in the development and maintenance of organisms, and hold great therapeutic promises. However, a number of questions must be answered to achieve an...Full Text Available
The ubiquitin–proteasome pathway is the principal system for extralysosomal protein degradation in eukaryotic cells, and is essential for the regulation and maintenance of basic cellular processes,...Full Text Available
Limited field trial results of a heating oil additive package developed to minimize unscheduled maintenance indicate that it achieves its goal of keeping heating oil systems cleaner. The multifunctional additive package was developed to provide improved fuel oxidation stability, improved corrosion protection, and dispersency. This combination of performance benefits was chosen because we believed it would retard the formation of sludge, as well as allow sludge already present to be carried through the system without fouling the fuel system components (dispersency should keep sludge particles small so they pass through the filtering system). Since many unscheduled maintenance calls are linked to fouling of the fuel filtering system, the overall goal of this technology is to reduce these maintenance calls. Photographic evidence shows that the additive package not only reduces the amount of sludge formed, but even removes ...
1 Measuring total plasma levels of disopyramide (DP) and the main metabolite mono-N-dealkyldisopyramide (MND) in patients on maintenance therapy with DP has shown concentrations of MND comparable with...Full Text Available
This paper describes EPRI`s computer based Performance, Operation and Maintenance Management System (``POMMS``) consisting of four (4) modules (``Modules``). These Modules are used to monitor, evaluate and analyze the cost effective operation of simple cycle and combined cycle gas turbine power plants. Inputs to POMMS relating to plant performance, availability and maintenance are monitored, stored in a data acquisition system and analyzed to determine their impact on performance and cost parameters. POMMS was developed by EPRI, Project Manager Fluor Daniel Power Generation Company and by the subcontractors who, together, engineered the individual POMMS Modules while working on EPRI`s Durability Surveillance of Advanced Gas Turbines Project (``Project``). The following modules are described in this paper and may be applied together or individually: Rotating Blade Temperature Measurement and Evaluation System Module (``BTMES``), Data Acquisition ...
The economics of renewable energy technologies when deployed in a decentralised manner are more favourable than the simple cost of the fossil fuel generated electricity displaced. They have capital and maintenance cost savings associated with the electrical transmission in infrastructures which are avoided. Worked examples are presented. (UK)
BackgroundMaintenance of healthy bone requires the balanced activities of osteoclasts (OCs), which resorb bone, and osteoblasts, which build bone. Disproportionate action of OCs...Full Text Available
Centrioles are intriguing cylindrical organelles composed of triplet microtubules. Proteomic data suggest that a large number of proteins besides tubulin are necessary for the formation and maintenance...Full Text Available
Mitochondrial heat shock protein 70 (mtHSP70) is found to play a primary role in cellular defense against physiological stress like exposure to environmental contaminants and helpful in the maintenance...Full Text Available
BackgroundIdentification of global livestock diversity hotspots and their importance in diversity maintenance is essential for making global conservation efforts. We screened 52...Full Text Available
Catch is a mechanical state occurring in some invertebrate smooth muscles characterized by high force maintenance and resistance to stretch during extremely slow relaxation. During catch, intracellular...Full Text Available
BackgroundThe widespread use of nutritional supplements among athletes is poorly understood. The prevalence of supplement intake and users' knowledge have been researched independently...Full Text Available
... were erroneous. The oriental rat flea, Xenopsylla cheopis Rothschild, is considered to be the primary vector of ... laboratory and production of Weigl's exanthematous typhus vaccine. In Maintenance of hum...
Serial studies of iron transport in patients on maintenance dialysis showed normal or raised values in almost all subjects and a transient increase soon after the start of dialysis in three. These...Full Text Available
Progress is briefly summarized for a large number of projects in the areas of research instruments, measurement and controls engineering, reactor systems, and maintenance management. (LEW)
Background:The cardiac sodium–calcium exchanger (NCX1) is a key sarcolemmal protein for the maintenance of calcium homeostasis in the heart. Since heart failure...Full Text Available
Responsibility for the operation and maintenance of the bulk of the 132 kV cable network in England and Wales was transferred from the CEGB to the area boards in the 1970s. Norweb has successfully dealt with the increase in work using in-house expertise exclusively.
BackgroundObesity has reached epidemic proportions in the United States. It is implicated in the development of a variety of chronic disease states and is associated with increased...Full Text Available
Research indicates that diesel equipment can be used safely in undergound coal mines provided that certain conditions prevail. These conditions are: the machines and engines are approved for underground use, an adequate maintenance and training program is in effect, an adequate monitoring system with proper instrumentation is used, and adequate ventilation is maintained.
BackgroundVariable platelet response to clopidogrel has been widely observed. Studies have shown that the mean aggregation response to clopidogrel can be changed...Full Text Available
Self-renewal of spermatogonial stem cells (SSCs) is the foundation for maintenance of spermatogenesis throughout life in males and for continuation of a species. The molecular mechanism underlying stem...Full Text Available
Maintenance energy expenditures were mesured for five rumen bacteria, Selenomonas ruminantium, Butyrivibrio fibrisolvens, Bacteroides ruminicola, Megasphaera elsdenii, and Streptococcus bovis, by using a complex medium with glucose as the carbon source. Large differences (as high as 8.5-fold) in maintenance energy expenditures were seen among these bacteria. The suggestion is made that maintenance requirements could be a significant determinant of bacterial competition in the rumen. Theoretical maximum growth yields, calculated from double reciprocal plots of yield versus dilution rate, were compared to theoretical Y(ATP) values in order to estimate minimum molar adenosine 5'-triphosphate yields from glucose for each bacterium. Results showed that relative yield among the bacteria was growth rate dependent. At high dilution rates, both S. ruminantium and S. bovis produced lactate as their principal fermentation product. At ...
This report documents the operation, maintenance, calibration, data acquisition and data reduction at the Chalk Point Meteorological Station for the period November 15, 1978 through November 15, 1979. Climatological data summaries for each month and calib...
Baldwin County is located on the Gulf of Mexico in Alabama and has a rapidly growing population. Almost 3,000 permits for septic systems are approved annually by by the Baldwin County Health Department. More than 50% of the county's residents rely on septic systems for their d...
ObjectiveMaintaining weight loss is a major challenge in obesity treatment. Individuals often indicate that waning motivation prompts cessation of effective weight...Full Text Available
The Burrard Thermal Generating Station is located at Port Moody, British Columbia, and burns natural gas to supply steam to six turbine units for generating up to 912 MW of electricity. The Burrard plant accounts for ca 8.7% of the provincial generating capability. Burrard is expected to continue to fill a vital role as a supplier of displaceable firm energy to the British Columbia Hydro system. In parallel with a renewed focus on Burrard from a system planning perspective, there have also been concerns about air pollution from the plant in the context of its possible effect on the region's air quality. To address this and other issues surrounding Burrard's future, B.C. Hydro established a project team to conduct a utilization study. The team's work focused on the role of Burrard in providing a reliable and profitable role in electricity generation, the options for dealing with the air quality issue, and the ...
Joanna Geary joined a Birmingham University team of scientists working on the project in Geneva. Simond Hadley took the pictures. "The most exciting thing of all" says professor Peter Watkins with a smile, "is we have absolutely no idea what will happen until we switch it on."
One of the supporting elements of the Advanced Turbine Systems (ATS) Program is the materials/manufacturing technologies task. The objective of this element is to address critical materials issues for both industrial and utility gas turbines. DOE Oak Ridge Operations Office (ORO) will manage this element of the program, and a team from DOE-ORO and Oak Ridge National Laboratory is coordinating the planning for the materials/manufacturing effort. This paper describes that planning activity which is in the early stages.
The SRI International industrial team completed a subsystem and system parametric analysis, a 100-MW/sub e/ commercial plant conceptual design, a cost and performance analysis, and a commercial assessment. An executive summary is presented in this volume. (WHK)
An extensive R and D program on the development of the joining technologies between armour (beryllium, tungsten and carbon fibre composites)/copper alloys heat sink and copper alloys/ stainless steel has been carried out by ITER Home Teams. A brief review of this R and D program is presented in this paper. Based on the results, reference technologies for use in ITER have been selected and recommended for further development. (author)
This document describes the High Performance Electrical Modeling and Simulation (HPEMS) Global Verification Test Suite (VERTS). The VERTS is a regression test suite used for verification of the electrical circuit simulation codes currently being developed by the HPEMS code development team. This document contains descriptions of the Tier I test cases.
This document describes the High Performance Electrical Modeling and Simulation (HPEMS) Global Verification Test Suite (VERTS). The VERTS is a regression test suite used for verification of the electrical circuit simulation codes currently being developed by the HPEMS code development team. This document contains descriptions of the Tier I test cases.
To assist in attaining the HSE's objective of providing perspective and focus for Safety Case Assessment, a generic model of the structural design process for the foundations of pile supported fixed steel structures has been developed. Interfaces between the foundation design team and other stakeholders have been identified and assessments made of both the magnitude and the potential significance of the uncertainties associated with key elements of the design process. (author)
F6.1,5X,F4.2,7X,F9.4,6X,F9.4,6X,F9.2,2X,. F8.2). ENDIF. 100 CONTINUE ...... When estimated the cost of producing many craft a learning curve serves as a ...
Data Qualification (DQ) is a formal, technical process whose objective is to affirm that experimental data are suitable for their intended use. Although it is not possible to develop a fixed recipe for the DQ process to cover all test situations, these general guidelines have been developed for the Nuclear Engineering Section to establish a framework for qualifying data from steady-state processing. These guidelines outline the role of the DQ team providing insight into the planning and conducting of the DQ process.
A team of physicians, pharmacists, and informatics professionals developed a CDSS added to a commercial electronic medical record system to provide prescribers with patient-specific maximum dosing recommendations...Full Text Available
... Future Job Fund Scheme Goodwood Allotments Location: Goodwood Allotments Work undertaken by long-term unemployed young people under the Future Jobs Fund (FJF) transforms derelict allotments into a readily workable space for the local community. New Parks Skegness Ride Location: New Parks Youth Centre Youths from the New Parks Club for Young People engage with sustainable transport and develop teamwork skills via a team bike ride. ...
The research team recruited eight Chinese American (seven females, one male) lay health workers (LHWs). They received 12 h of training about colorectal cancer (CRC), its screening, and basic...Full Text Available
A software called KEPCO RCM workstation (KRCM) has been developed to optimize the maintenance strategies of Korean nuclear power plants. The program modules of the KRCM were designed in a manner that combines EPRI methodologies and KEPRI analysis technique. The KRCM is being applied to the three pilot system, chemical and volume control system, main steam system, and compressed air system of Yonggwang Units 1 and 2. In addition, the KRCM can be utilized as a tool to meet a part of the requirements of maintenance rule (MR) imposed by U.S. NRC. 3 refs., 4 figs. (Author)
The role of robotics and remote handling equipment in future nuclear power plant maintenance activities is discussed in the context of artificial intelligence applications. Special requirements manipulators, control systems, and man-machine interfaces for nuclear applications are noted. Tasks might include inspection with cameras, eddy current probes, and leak detectors; the collection of material samples; radiation monitoring; and the disassembly, repair and reassembly of a variety of system components. A robot with vision and force sensing and an intelligent control system that can access a knowledge base is schematically described. Recent advances in image interpretation systems are also discussed.
The role of robotics and remote handling equipment in future nuclear power plant maintenance activities is discussed in the context of artificial intelligence applications. Special requirements manipulators, control systems, and man-machine interfaces for nuclear applications are noted. Tasks might include inspection with cameras, eddy current probes, and leak detectors; the collection of material samples; radiation monitoring; and the disassembly, repair and reassembly of a variety of system components. A robot with vision and force sensing and an intelligent control system that can access a knowledge base is schematically described. Recent advances in image interpretation systems are also discussed.
Characteristics of the Ukrainian NSA NRI radiation facility for scientific researches and developments of industrial radiation technology are performed. Parts of the facility, design peculiarities of technical tools are described. Biological protection of the facility and radiation protection system, transport line, systems of technical provision and radiation measurements are discussed
In this paper the possibility of using the test facility PACTEL concerning the investigations of thermal hydraulic special features of the primary coolant circuit acting under natural circulation is under consideration. It is suggested to study a stratification phenomenon of a coolant in upper plenum of a reactor and also a horizontal steam generator (HSG) hot collector temperature regime. For such investigations the facility must be modified. It is shown that this work is not large and expensive, as the facility is a lightly suitable unit for different researches. (orig.)
In this paper the possibility of using the test facility PACTEL concerning the investigations of thermal hydraulic special features of the primary coolant circuit acting under natural circulation is under consideration. It is suggested to study a stratification phenomenon of a coolant in upper plenum of a reactor and also a horizontal steam generator (HSG) hot collector temperature regime. For such investigations the facility must be modified. It is shown that this work is not large and expensive, as the facility is a lightly suitable unit for different researches. (orig.)
A thermal neutron imaging facility for computed tomography and real-time neutron radiography is being developed at the University of Texas at Austin. The TRIGA reactor is a graphite-reflected Mark It pool-type research reactor. The neutron imaging facility will use beam port, which is at one end of a through part. Monte Carlo calculations were used to design the neutron collimator for this facility.
This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines.
... harassment, incidental to construction and operation of an offshore liquefied natural gas (LNG) facility. Under the Marine Mammal Protection ... ...
Korea Atomic Energy Research Institute (KAERI) has many R and D facilities in operation, including HANARO research reactor, radioactive waste treatment facility (RWTF), post-irradiation examination facility (PIEF) and irradiated material test facility (IMEF). Recently, nation-wide interest is focused on the safety and security of major industrial facilities. Safe operation of nuclear facilities is imperative because of the consequence of public disaster by radiological release/ contamination, in case of an accident. Recently, Ministry of Science and Technology (MOST) of the Korean government announced amendments of Atomic Energy laws to enforce requirements of the physical protection and radiological emergency. In this paper, the context of amended Atomic Energy laws were reviewed to confirm quality assurance measures and identify additional QA activities, if ...
This document - IAEA Safeguards: Implementation Blueprint of Commercial Satellite Imagery - constitutes the second report from SSC Satellitbild giving a structured view and solid guidelines on how to proceed with a conceivable implementation of satellite imagery to support Safeguards activities of the Agency. This Phase 2 report presents a large number of concrete recommendations regarding suggested management issues, work organisation, imagery purchasing and team building. The study has also resulted in several lists of actions and preliminary project plans with GANT schedules concerning training, hardware and software, as well as for the initial pilot studies. In both the Phase 1 and Phase 2 studies it is confirmed that the proposed concept of a relatively small Imagery Unit using high-resolution data will be a sound and feasible undertaking. Such a unit capable of performing advanced image processing as a tool for various safeguard tasks will give the Agency an ...
This report summarizes the research conducted during Budget Period One on the project ''Improved Natural Gas Storage Well Remediation''. The project team consisted of Furness-Newburge, Inc., the technology developer; TechSavants, Inc., the technology validator; and Nicor Technologies, Inc., the technology user. The overall objectives for the project were: (1) To develop, fabricate and test prototype laboratory devices using sonication and underwater plasma to remove scale from natural gas storage well piping and perforations; (2) To modify the laboratory devices into units capable of being used downhole; (3) To test the capability of the downhole units to remove scale in an observation well at a natural gas storage field; (4) To modify (if necessary) and field harden the units and then test the units in two pressurized injection/withdrawal gas storage wells; and (5) To prepare the project's final report. This report ...
The Tennessee Valley Authority (TVA), the Electric Power Research Institute (EPRI), and the Department of Energy-National Energy Technologies Laboratory (DOE-NETL) are evaluating and demonstrating integration of terrestrial carbon sequestration techniques at a coal-fired electric power plant through the use of Flue Gas Desulfurization (FGD) system gypsum as a soil amendment and mulch, and coal fly ash pond process water for periodic irrigation. From January to March 2002, the Project Team initiated the construction of a 40 ha Carbon Capture and Water Emissions Treatment System (CCWESTRS) near TVA's Paradise Fossil Plant on marginally reclaimed surface coal mine lands in Kentucky. The CCWESTRS is growing commercial grade trees and cover crops and is expected to sequester 1.5-2.0 MT/ha carbon per year over a 20-year period. The concept could be used to meet a portion of the timber industry's needs while simultaneously sequestering carbon in lands ...
The Savannah River Site (SRS) is currently developing a new facility, the Actinide Packaging and Storage Facility (APSF), to process and store legacy materials from the United States nuclear stockpile. A variety of materials, with a variety of properties, packaging and handling/storage requirements, will be processed and stored at the facility. Since these materials are hazardous and radioactive, automation will be used to minimize worker exposure. Other benefits derived from automation of the facility include increased throughput capacity and enhanced security. The diversity of materials and packaging geometries to be handled poses challenges to the automation of facility processes. In addition, the nature of the materials to be processed underscores the need for safety, reliability and serviceability. The application of automation in this facility must, ...
The primary objectives of this study were to test two utility analysis models, the Cascio-Ramos Estimate of Performance in Dollars (CREPID) model and Godkewitsch financial utility analysis model and to determine their appropriateness as tools for evaluating training. This study was conducted in conjunction with Philadelphia Electric Company's Nuclear Training Group. Job performance of nuclear maintenance workers was assessed to document the impact of the training program. Assessment of job performance covered six job performance themes. Additionally, front-line nuclear maintenance supervisors were interviewed to determine their perceptions of the nuclear maintenance training. A comparison of supervisor's perceptions and outcomes of the utility analysis models was made to determine the appropriateness of utility analysis as quantitative tools for evaluating the nuclear maintenance ...
The low budgets of local governments and Federal States in Germany as well as lack of financial means of renters delaying thorough modernisation of existing heating systems in residential and public buildings, novel heat supply and related customer services are emerging on the market. Heat supply companies and housing construction associations increasingly use modern electronics and telecommunication systems for heating system upgrading and reliable operation and maintenance. This option holds an enormous potential of saving money today and in the future. Installation of remote control and maintenance systems and the related telephone-based services offer fast repair and other services via electronic telecommunications systems, thus saving money and manpower for the repair services of heat suppliers or plumbers, or financial losses due to rents being docked for broken down heating systems. Such remote control and ...
The Lincoln Public School District, in Lincoln, Nebraska, recently installed vertical-bore geothermal heat pump systems in four, new, elementary schools. Because the district has consistent maintenance records and procedures, it was possible to study repair, service and corrective maintenance requests for 20 schools in the district. Each school studied provides cooling to over 70% of its total floor area and uses one of the following heating and cooling systems: vertical-bore geothermal heat pumps (GHPs), air-cooled chiller with gas-fired hot water boiler (ACUGHWB), water-cooled chiller with gas-fired hot water boiler (WCCYGHWB), or water-cooled chiller with gas-fired steam boiler (WCUGSB). Preventative maintenance and capital renewal activities were not included in the available database. GHP schools reported average total costs at 2.13 cents/ft{sup 2}-yr, followed by ACC/GHWB schools at 2.88 cents/ft{sup 2}-yr, WCC/GSB ...
The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades.
Conoco`s Crosswell Reservoir Characterization (CRC) team is using Decision and Risk Analysis (D and RA) to evaluate the potential economic impact of the authors` projects. D and RA can be a useful tool for refining the direction of a project and communicating the value of information in economic terms. Initial studies show that CRC has high potential economic value. Three steps were used to analyze the value of the CRC project. A high-level, industry-wide model was developed to look at the technical, application, and commercialization success of the technology. The team considered an infill drilling decision in shallow shelf carbonates as a detailed case. For that case, fully integrating crosswell information with supporting data (well logs, cores, production information, etc.) leads to a three-fold increase in expected value. The third step, a portfolio analysis of all crosswell applications, was initiated, but not completed. Given the ...
Conoco's Crosswell Reservoir Characterization (CRC) team is using Decision and Risk Analysis (D and RA) to evaluate the potential economic impact of the authors' projects. D and RA can be a useful tool for refining the direction of a project and communicating the value of information in economic terms. Initial studies show that CRC has high potential economic value. Three steps were used to analyze the value of the CRC project. A high-level, industry-wide model was developed to look at the technical, application, and commercialization success of the technology. The team considered an infill drilling decision in shallow shelf carbonates as a detailed case. For that case, fully integrating crosswell information with supporting data (well logs, cores, production information, etc.) leads to a three-fold increase in expected value. The third step, a portfolio analysis of all crosswell applications, was initiated, but not completed. Given the ...
Building 922 houses all of SNL/California`s ES and H Departments: Health Protection, Environmental Protection, Safety, and Environmental Operations. It covers approximately 10,000 square feet and houses about 80 people. The office personnel generate nonhazardous solid office wastes in their daily activities. To determine the types and amounts of waste generated, a special PPOA sorting team sorted all of the trash collected from the building for a period of one-week (including paper and aluminum cans in the recycling bins). The team sorted the trash into major categories: paper, plastic, metals, glass, wet garbage, rest room waste, and miscellaneous materials. They then sorted it into subcategories within each major category. Rest room waste was collected but not sorted. The waste in each category was weighed separately. The total amount of trash collected during the week was approximately 168.8 kg (371.4 lbs). The results of this PPOA indicate ...
Korea Advanced Energy Research Institute (KAERI) conceived and started the development of MARS code with the main objective of producing a state-of-the-art realistic thermal hydraulic systems analysis code with multi-dimensional analysis capability. MARS achieves this objective by very tightly integrating the one dimensional RELAP5/MOD3 with the multi-dimensional COBRA-TF codes. The method of integration of the two codes is based on the dynamic link library techniques, and the system pressure equation matrices of both codes are implicitly integrated and solved simultaneously. In addition, the Equation-Of-State (EOS) for the light water was unified by replacing the EOS of COBRA-TF by that of the RELAP5. This models and correlations manual provides a complete list of detailed information of the thermal-hydraulic models used in MARS, so that this report would be very useful for the code users. The overall structure of the manual is modeled on the structure of the RELAP5 and as such the ...
This paper describes the challenges involved in the construction of a mid-rise housing development in Boston, Massachusetts, during which the development team elected to upgrade the initial design criteria from Minimum Building Code to Energy Star and Leadership in Energy and Environmental Design (LEED) certification. The various constraints imposed on the development were discussed, including constraints imposed by the involvement of substantial public funds as well as the constraints imposed by various funding sources that were approached to leverage energy efficiency and green building investment via competitive grant solicitations. Building owner and utility cost management priorities were outlined along with details of central mechanical system selection. Issues concerning isolation and compartmentalization were examined along with indoor pollution source control. A building load analysis was presented as well as details of daily heating and cooling ...
A team at the Paul Scherrer Institute (PSI) recently achieved a breakthrough in the development of an environment-friendly and rechargeable battery with novel electrodes. The energy storage density of a rechargeable 12 V/20 Ah zinc/air battery could be increased to 100 watt hours per kilogramme - three times as much as conventional lead accumulators. 20-Ah cells could be charged and discharged 55 times in 1000 hours without any loss of capacity worth mentioning. This is a remarkable cycle stability. (orig.) [German] Einem Team des Paul Scherrer Instituts (PSI) ist kuerzlich bei der Entwicklung einer umweltfreundlichen und wiederaufladbaren Batterie mit neuartigen Elektroden der Durchbruch gelungen. Dabei konnte die Energiespeicherdichte einer wiederaufladbaren 12 V/20 Ah-Zink-Luft-Batterie auf 100 Wattstunden pro Kilogramm gesteigert werden - dreimal soviel wie bei konventionellen Bleiakkumulatoren. 20-Ah-Zellen konnten in 1000 Stunden ohne ...
Ontario's Countdown Acid Rain program was formulated in 1985 and placed an annual SO{sub 2} emissions cap of 885 kilotonnes over the province from 1994. Caps were placed on emissions from the Inco nickel/copper smelter in Sudbury, the Falconbridge nickel/copper smelter in Sudbury, the Algoma iron ore sintering plant in Wawa, and Ontario Hydro fossil-fuel plants province-wide. Semi-annual reports are required of the companies, with the 6th report outlining the final planning phase and the 7th and later reports outlining implementation progress. This document summarizes the contents of the 7th set of reports and the responses of the government review team to each company's efforts. All companies have begun implementing abatement plans outlined in the final planning phase reports of December 1988 at a rapid pace and are generally on track in controlling emissions. However, all 4 company reports lack the necessary detail for a complete review of the ...
The enclosed document describes a conceptual decision tool (hereinafter, Tool) for determining applicability of and for optimizing air sparging systems. The Tool was developed by a multi-disciplinary team of internationally recognized experts in air sparging technology, lead by a group of project and task managers at Parsons Engineering Science, Inc. (Parsons ES). The team included Mr. Douglas Downey and Dr. Robert Hinchee of Parsons ES, Dr. Paul Johnson of Arizona State University, Dr. Richard Johnson of Oregon Graduate Institute, and Mr. Michael Marley of Envirogen, Inc. User Community Panel Review was coordinated by Dr. Robert Siegrist of Colorado School of Mines (also of Oak Ridge National Laboratory) and Dr. Thomas Brouns of Battelle/Pacific Northwest Laboratory. The Tool is intended to provide guidance to field practitioners and environmental managers for evaluating the applicability and optimization of air sparging as remedial action ...
Citizens Gas and Coke Utility operates three coke oven batteries, producing both foundry coke and blast furnace coke, under the trade name Indianapolis Coke. Active participation in the regulation negotiation process by the Vice President of Indianapolis Coke allowed the company to accurately anticipate the environmental regulations, long before they were set in law. Several improvements were put into motion that helps them meet the new environmental regulations. Better trained operators with new job positions dedicated solely to environmental compliance, an extensive environmental training program, and two innovations, a portable oven door milling and cleaning machine and three new computer applications are the result of team efforts. The focus of this paper is development of the computer applications designed to enhance three areas of environmental compliance. The three areas addressed by the applications are documentation and information deployment, problem ...
The thesis gives an overview of the validation process for thermal-hydraulic system codes and it presents in more detail the assessment and validation of the French code CATHARE for VVER calculations. Three assessment cases are presented: loop seal clearing, core reflooding and flow in a horizontal steam generator. The experience gained during these assessment and validation calculations has been used to analyze the behavior of the horizontal steam generator and the natural circulation in the geometry of the Loviisa nuclear power plant. Large part of the work has been performed in cooperation with the CATHARE-team in Grenoble, France. (41 refs., 11 figs., 8 tabs.).
This paper summarises the main results obtained so far in the frame of the EU Home Team test programme of ITER primary wall small scale mock ups. It describes briefly the fabrication method of the mock ups, the test conditions and the main results obtained with high heat flux and thermal fatigue tests of Cu alloy/stainless steel and beryllium/Cu alloy/stainless steel mock ups. The results obtained so far show good thermal fatigue performance and operation margin of the ITER primary first wall concept. (author)
This report has been prepared in support of the industry effort to standardize nuclear plant designs. This document describes the Combustion Engineering, Inc. System 80+trademark Standard Design. This volume contain Chapter 18 -- Human Factors Engineering. Topics covered include: design team organization and responsibilities; design goals and design bases; design process and application to human factors engineering; functional task analysis; control room configuration; information presentation and panel layout evaluation; control and monitoring outside the main control room; and verification and validation.
The solar powered electric vehicle race began in Arlington, Texas on June 20, 1993 and finished 7 days later in Minneapolis, Minnesota. Thirty four teams from Universities across the United States and Puerto Rico completed the race out of thirty six entries. The race demonstrated the viability of sunlight powered vehicles as the better average daily speeds were in excess of 50 miles an hour. Even in the rain, most average speeds were in excess of 15 miles an hour. Analyzed results, photographs, and project details are included. (GHH)
The paper reports the progress made by the ITER Home Teams in the development of robust carbon and tungsten armoured plasma facing components for the ITER divertor. The activities on the development and study of armour materials, joining technologies, non-destructive evaluation techniques, high heat flux testing of manufactured components and neutron irradiation resistance studies are presented. The results of these activities confirm the feasibility of the main divertor components. Examples of the fruitful collaboration between Parties and future R and D needs are also described. (author)
The Office of Civilian Radioactive Waste Management (OCRWM) is executing a plan for improvement of the United States Nuclear Waste Management Program. As part of the plan, OCRWM is performing a systems engineering analysis of both the physical system, i.e., the Nuclear Waste Management System (NWMS), and the programmatic functions that must be accomplished to bring the physical system into being. The functional analysis effort is being performed by two separate teams working in parallel, one of which addresses the physical system functions and the other the programmatic functions. This paper presents information on the analysis of the programmatic functions.
This document reports the results of the FY 2005 PNNL VPP Program Evaluation, which is a self-assessment of the operational and programmatic performance of the Laboratory related to worker safety and health. The report was compiled by a team of worker representatives and safety professionals who evaluated the Laboratory's worker safety and health programs on the basis of DOE-VPP criteria. The principle elements of DOE's VPP program are: Management Leadership, Employee Involvement, Worksite Analysis, Hazard Prevention and Control, and Safety and Health Training.
Customer knowledge has become an important topic for both academicians and practitioners in recent years. However, there has been little academic research on the utilization of customer-specific knowledge. This study adds to our understanding in focusing on the relationships between various intra-organizational factors and customer knowledge utilization in the context of key account management. The results of the study show, that the use of teams, top management involvement, KAM formalization and CRM technology enhance the utilization of customer knowledge in the management of large industrial key account customers.
Aim.- To describe the clinical aspects of implantable cardioverter defibrillators care in Sweden with focus on organisation, the role and education of nurses, patient information and education and areas in need of improvement. Background.- Implantable cardioverter defibrillators implantations have developed rapidly in recent years and are now an established arrhythmia treatment. The expanding indication for implantable cardioverter defibrillators implantation demands new competencies and resources in the implantable cardioverter defibrillators team members. Methods.- Participants were recruited among physicians and nurses in all of the hospitals implanting implantable cardioverter defibrillators (n-=-16). Data were collected by a questionnaire. Additionally, all written educational materia...
This paper presents the main achievements of the European Home Team (EU HT) test programme of ITER primary wall small scale mock ups. It describes briefly the fabrication method of the mock ups, the test conditions and the main results obtained with high heat flux and thermal fatigue tests of Cu alloy/stainless steel and beryllium/Cu alloy/stainless steel mock ups. The results obtained so far show very good thermal fatigue performance and operation margin of the ITER primary first wall concept.
The contribution under consideration spans a wide curve from the first deadly accident of motorized aviation in the year 1908 up to newer tendencies of the so-called team resources management on observation points and control stations in order to pursue fundamental questions in man-machine systems. A continuous differentiation in the consideration of the factor human beings in complex technical systems is described. This is illustrated by the example of concepts for leadership, communication and decision making on observation points and control stations.
On the basis of observations of the JTEC team, it appears that Japanese universities and research institutes are leading long-term R&D thrusts for development of new materials casting technologies. Significant efforts include amorphous metals, intermetallics, application of MHD in continuous casting of steel, and energy efficient furnace technology. Industrial R&D seems focused more on process improvements than on new product technologies, but significant efforts in new cast materials included cast metal matrix composites, materials substitutions for thinner wall products, and advanced ceramic products for foundry industry applications.
It is becoming increasingly evident that a linkage needs to exist between the siting of emergency response units and the routing of high level radioactive waste shipments. It is important to position the response teams so that the most efficient and effective emergency response can be provided. But the data needed to solve the siting problem are fragmented. This paper identifies the weak points in the data already available and suggests ways in which the data can be strengthened in a cost-effective manner. Among the weakest areas are estimates of the time required for various response events to occur, such as notification time, mobilization time, travel time, and containment time.
The focus of the Chernobyl Studies Project has now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.
During the 1990s, a debate took place in Sweden concerning Conductive Education. Proponents of this method focused their critique on the role and methods of physiotherapists but this profession was not active in the debate. Instead, the medical profession came out as defenders of habilitation services and methods. Departing from sociology of the professions, our objective in this article is to analyze the physiotherapists' silence in relation to the profession's position and its relation to the medical profession. The analysis is based on data from interviews with members of habilitation teams and other key persons, and on documents. The relative silence of physiotherapists is found to be related to both interprofessional factors (the subordination under the medical profession paired with ...
This presentation is primarily about unsteady aerodynamics in relation to wind turbines. It is divided into three very distinct sections: (1) Basic unsteady aerodynamics; (2) VAWT performance modelling and (3) Passive stall regulation of VAWTs. The aim of the presentation is to illustrate that, if desired, future wind turbine blades could be aerodynamically tailored to exploit the unsteady nature of the VAWT flow with far greater confidence and insight than has been hitherto possible. To this effect, the collaborating British research teams and, in particular, VAWT Ltd. have assembled sufficient knowledge for such a conclusion to be made. (author).
The American Organization of Nurse Executives (AONE) and The Leadership Studio have collaborated to create a one-of-a-kind Executive Coaching Resource Center for nurse leaders and their teams. This resource-designed specifically for AONE members-is a one-stop web-based library developed to assist nurse leaders who want to learn more about utilizing executive coaching services. It focuses on the overall benefits of coaching for nurse leaders-both tangible and intangible-and provides return on investment information for executive coaching based on the most current research.
number of technical requirements and performance criteria can drive stellarator costs, e.g., tight tolerances, accurate coil positioning, low aspect ratio (compactness), choice of assembly strategy, metrology, and complexity of the stellarator coil geometry. With the completion of a seven-year design and construction effort of the National Compact Stellarator Experiment (NCSX) it is useful to interject the NCSX experience along with the collective experiences of the NCSX stellarator community to improving the stellarator configuration. Can improvements in maintenance be achieved by altering the stellarator magnet configuration with changes in the coil shape or with the combination of trim coils? Can a mechanical configuration be identified that incorporates a partial set of shaped fixed stellarator coils along with some removable coil set to enhance the overall machine maintenance? Are there other approaches that will simplify the concepts, ...
A number of technical requirements and performance criteria can drive stellarator costs, e.g., tight tolerances, accurate coil positioning, low aspect ratio (compactness), choice of assembly strategy, metrology, and complexity of the stellarator coil geometry. With the completion of a seven-year design and construction effort of the National Compact Stellarator Experiment (NCSX) it is useful to interject the NCSX experience along with the collective experiences of the NCSX stellarator community to improving the stellarator configuration. Can improvements in maintenance be achieved by altering the stellarator magnet configuration with changes in the coil shape or with the combination of trim coils? Can a mechanical configuration be identified that incorporates a partial set of shaped fixed stellarator coils along with some removable coil set to enhance the overall machine maintenance? Are there other approaches that will simplify the concepts, ...
Prepared to make housing project managers, maintenance engineering staff, and designers and architects of HUD - assisted and HUD - insured housing projects and mobile home parks aware of their responsibilities under the Natural Gas Pipeline Safety Act, this handbook provides technical guidance for the reduction of gas leaks and the handling of gas leak incidents in residential areas. The hazards of natural gas, concern over gas safety in residential areas, applicable codes and standards, and sources of information and help are reviewed, along with maintenance and engineering considerations relating to gas pipe failures, the detection of gas leaks, appliance servicing, and pipe installation, repair, and replacement. Housing management considerations are also examined, with attention to recordkeeping and reporting, emergency contingency planning, tenant education, staff qualifications and training, and the development and use of a ...
The population masses in many coastal zones in Japan, and human activities are greatly effected. The representative water area is the Tokyo Bay. The population of the Tokyo Bay reaches 26 million at present, and a mass of organic substance and nutrient salt flow into it through rivers and sewage-treatment plants, etc. With the improvement of pollution source countermeasure and sewerage in the area, the inflow load to the Bay gradually decreases, but in the inner bay, red tide is generating in the summertime mainly. And, the anoxic water areas observed in bottom layer in summertime make large effects on the seafood. It is a large theme to clarify formation process of the anoxic water area and to solve this problem for the Tokyo Bay in the twenty-first century. In this paper, changes in water qualities and human activities and fundamental approach of water quality conservation of the Tokyo Bay are described. As maintenance and regeneration countermeasures of the ...
Power plant components exposed to environments such as water and soil are susceptible to severe corrosion. Many times the effect of corrosion in power plant components can be catastrophic. The problem is aggravated for underground pipelines due to additional factors such as large network of pipelines, proximity to earth mat, high voltage transmission lines, corrosive chemicals, inadequate approach etc. Other components such as condenser water boxes, internals of pipelines, clarifier bridge structures, cooling water inlet gates and pipes etc. which are in continuous contact with water, are subjected to severe corrosion. The nature and locations of all such components are at places which are not accessible for routine maintenance and hence they require long term reliable protection against corrosion. Experience has shown that anti-corrosive coatings are inadequate in preventing corrosion and due to their location regular maintenance coatings are ...
The leading environmental problem facing coastal Louisiana regions is the loss of wetlands. Oil and gas exploration and production activities have contributed to wetland damage through erosion at numerous sites where canals have been cut through the marsh to access drilling sites. An independent oil and gas producer, working with Southeastern Louisiana University and two oil field service companies, developed a process to stabilize drill cuttings so that they could be used as a substrate to grow wetlands vegetation. The U.S. Department of Energy (DOE) funded a project under which the process would be validated through laboratory studies and field demonstrations. The laboratory studies demonstrated that treated drill cuttings support the growth of wetlands vegetation. However, neither the Army Corps of Engineers (COE) nor the U.S. Environmental Protection Agency (EPA) would grant regulatory approval for afield trial of the process. Argonne National Laboratory was asked to join the ...
Radiotherapy recent development in cancer treatment needs strong procedures and quality assessment to improve safety both for patients and professionals. In Ile de France territory, a coordinated action between ASN inspectors and medical doctors specialized in public health (MISP), working as civil servants in health administration, was initiated at the end of 2007. An inspection guideline was implemented in a workshop between ASN and Regional Hospital Agency (ARH). The MISP as health administrator has to verify if care organisation responds to treatment cancer regulatory framework: as a doctor he is authorized to access to patient records to know which treatment was chosen. He has to assure if the therapeutic guidelines are respected. His comprehensive approach is essentially patient-oriented. The MISP inspection coordinated with ASN inspectors is a very pertinent pluri-disciplinary approach, undeniably necessary in such a medical technic. The effectiveness of the radiotherapy ...
Radiotherapy recent development in cancer treatment needs strong procedures and quality assessment to improve safety both for patients and professionals. In Ile de France territory, a coordinated action between ASN inspectors and medical doctors specialized in public health (MISP), working as civil servants in health administration, was initiated at the end of 2007. An inspection guideline was implemented in a workshop between ASN and Regional Hospital Agency (ARH). The MISP as health administrator has to verify if care organisation responds to treatment cancer regulatory framework: as a doctor he is authorized to access to patient records to know which treatment was chosen. He has to assure if the therapeutic guidelines are respected. His comprehensive approach is essentially patient-oriented. The MISP inspection coordinated with ASN inspectors is a very pertinent pluri-disciplinary approach, undeniably necessary in such a medical technic. The effectiveness of the radiotherapy ...
This report presents highlights of activities in the Acceleartor Technology (AT) Division from April through December 1978. The report is divided into 10 sections to cover work done by the four groups that make up AT Division (AT-1, AT-2, AT-3, and AT-4). Section I is a brief summary of the whole report. Sections II through VI describe work done by At-1, the Linac Technology Group. Subjects covered are the Pion Generation for Medical Irradiation Program, the Electronuclear Fuel-Producing Accelerator Program, the Gyrocon rf Amplifier Program, the Electron Linear Accelerator Program, and the Free Electron Laser Program. Section VII covers the Linear Accelerator Beam Dynamics development, and Sec. VIII deals with work with the H/sup -/ Ion Source. Most of the work in Secs. VII and VIII was done by AT-2, the Special Projects Group, although work on factors influencing emittance growth was done by MP-9, and results on emittance growth in the new European Council for Nuclear Research (CERN) ...
A limited program of field measurements was undertaken in order to define the wind characteristics of the DOE/Sandia vertical axis wind turbine test facility. Because micrometeorological conditions under which a particular wind turbine is tested may have ...
This report provides the results of a JASON review of the technical feasibility of using the Department of Energy`s (DOE`s) Fast Flux Test Facility (FFTF) to generate tritium needed for the enduring United States nuclear weapons stockpile.
A brief overview of the conceptual design of a solar central receiver system integrated with an existing cogeneration facility is provided. A synopsis of the performance and economic evaluation, and an assessment of the concept from the site owner's perspective are given.
The results of the two most recently completed runs at the Wilsonville Advanced Coal Liquefaction Research and Development Facility are presented. In Run 255, initial screening of operating conditions for the liquefaction of a Texas lignite was completed....
Two cases of pulmonary alveolar proteinosis, including one death, occurred in workers at a facility producing indium-tin oxide (ITO), a compound used in recent years to make flat panel displays. Both...Full Text Available
The Heat Cycle Research Facility (HCRF) is an experimental binary-cycle facility used to investigate different concepts and/or components for generating electrical power from a geothermal resource. This report briefly desc
... Radon gas concentrations are measured using instruments with calibrations traceable to the UK National Physical Laboratory and PTB, Germany. The primary facility is a 43 m3 walk-in chamber accessed by an airlock. Radon gas is maintained at a level in this chamber that is ...
This volume is a summary of the results of the final report of the Energy Engineering Analysis Program (EEAP) Study of 30 selected dining facilities at Fort Campbell, Kentucky.
Thirty-seven papers were presented at this conference in five sessions. Topics covered include regulation, control and consequences of decontamination; decontamination of components and facilities; chemical and non-chemical methods of decontamination; and TMI decontamination experience.
In the study three loss-of-feedwater type experiments which were preformed with the PACTEL facility has been calculated with two computer codes. The purpose of the experiments was to gain information about the behaviour of horizontal steam generator in a ...
...capacity, and ownership of all planned and existing onshore pipelines, storage facilities, refineries, petrochemical...will be served by the port, including: (i) Onshore pipelines; (ii) Storage facilities; (iii)...
The Department of Energy (DOE) currently operates four thermal treatment facilities that are permitted under regulations for hazardous waste combustors. As regulations become more stringent and public stakeholders become more influential, permitting these facilities is increasingly difficult. As they become more available, continuous emission monitors (CEMs) may offer the potential to assure regulators and the public of the safe operation of treatment facilities. The Mixed Waste Focus Area (MWFA) has participated in the development and testing of a variety of CEMs that could have application to DOE facilities.
This study is an evaluation of the potential environmental impacts of contaminated groundwater from the ASARCO metals refining facility adjacent to the ...
The field of ion acceleration to higher energies has grown rapidly in the last years. Many new facilities as well as substantial upgrades of existing facilities have extended the mass and energy range of available beams. Perhaps more significant for the long-term development of the field has been the expansion in the applications of these beams, and the building of facilities dedicated to areas outside of nuclear physics. This review will cover many of these new developments. Emphasis will be placed on accelerators with final energies above 50 MeV/amu. Facilities such as superconducting cyclotrons and storage rings are adequately covered in other review papers, and so will not be covered here.
The 2nd periodical inspection was carried out on the asphalt solidification facility and the incinerator in Unit 2 of the Sendai Nuclear Power Station from November 5 to 28, 1985. Inspection was made in radiation control facility and disposal facility. By external appearance, disassembly, function and performance tests there were observed no abnormalities. The personnel exposure doses during the inspection were below the permissible level. In the inspection, improvement etc. works were not done. (Mori, K.).
The regular inspection of No.2 plant in Sendai Nuclear Power Station was carried out from January 7 to February 8, 1985. The summary of the results of this regular inspection is as follows. The facilities as the object of inspection were radiation control facilities and waste facilities. On these facilities as the object of inspection, the appearance, disassembling, functional, performance and other inspections were carried out, and as the results, abnormality was not found at all. The works related to this regular inspection were accomplished within the range of the allowable radiation dose based on the relevant laws. (Kako, I.).
The purpose of this document is to describe the NIF Project Organization and the roles and responsibilities of the managers charged with executing the Project.
The ANDRA, the French national agency of radioactive wastes, is organizing today the information needs of tomorrow. The aim is to allow the future generations to have access to the knowledge of the existence of subsurface radioactive waste facilities and to understand the context and technologies of such facilities. The storage of this information is made on 'permanent paper', a high resistant paper with a lifetime of 600 to 1000 years. An updating of these data is made every 5 years for each waste disposal center. Another project, still in progress, concerns the memory management of deep geologic waste disposal facilities for which the time scale to be considered is of the order of millennia. (J.S.)
The DP West Plutonium Facility operated by the Los Alamos National Laboratory, Los Alamos, New Mexico, was decontaminated between April 1978 and April 1981. The facility was constructed in 1944 to 1945 to produce plutonium metal and fabricate parts for nuclear weapons. It was continually used as a plutonium processing and research facility until mid-1978. Decontamination operations included dismantling and removing gloveboxes and conveyor tunnels; removing process systems, utilities, and exhaust ducts; and decontaminating all remaining surfaces. This report describes glovebox and conveyor tunnel separations, decontamination techniques, health and safety considerations, waste management procedures, and costs of the operation.
Jet Propulsion Laboratory. California Institute of Technology. Pasadena, California. Energy and Water Conservation. Steve Rigdon. Facilities Energy Manager ...
... is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP ...
... projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan, without ...
In order to assess whether an oil shale test facility would be of significant use to private sector oil shale developers, the US DOE has studied the past history of oil shale development and its potential for replacing petroleum supplies. A generic test facility's primary function would be to test concepts of mining, retorting, upgrading, and environmental aspects at the engineering scale. This paper summarizes the US oil shale resources, gives a technology analysis, and discusses the potential for a test facility.
An expert system was developed which helps maintenance personnel diagnose the condition of rotor and stator windings and their cores, in motors and generators rated 2300 V and above. The expert system, called MICAA[TM], used an approach which has been found to be effective for diagnosing medical problems. The program required the user to input machine nameplate information, operating status, and any past test data available. In addition, the program would suggest tests that may be useful, as well as provide guidance to maintenance personnel on what to look for in visual inspections of the machine. The expert system stored and correlated all this information, calculated the overall condition of the component in question, and identified the most likely specific causes of any deterioration. The basic methodology of motor and generator condition assessment, and the architecture and processing performed by MICAA to obtain these capabilities were ...
The long-term support required from Canada in the operation and maintenance of overseas CANDU nuclear generating stations after commercial operation has commenced is described, with reference entirely to the KANUPP reactor. This includes: technical support to station staff to increase plant reliability and maintainability; assistance with plant improvements; procurement of spares and consumables; and assistance with training programmes. This technical support may be provided by a small number of Canadian staff actually resident at the power station; by short-term visits of Canadian specialists to site and by technical and procurement services provided from Canada. Examples of technical problems experienced are given, showing typical services required from Canada.
Two third-grade Taiwanese students at risk for emotional and behavioral disorders participated in a pull-out, small-group social skills training program developed to promote their skill acquisition and maintenance. Using a multiple baseline across skills design, the authors demonstrated that both participants made marked performance improvement in all three targeted social skills of on-task, appropriate conflict resolution, and cooperation during the intervention condition. Maintenance and follow-up data showed that both participants sustained their use of taught social skills in the training setting and their third-grade classroom, respectively. Social validity measures, including peer sociometric ratings and consumer satisfaction questionnaires and interviews, supported the positive effects of the social skills training program for both participants. Implications for research and practice are discussed. (Contains 2 tables and 2 figures.)
In the world of pipeline maintenance, there are pigs and there are intelligent pigs. Intelligent pigs, when launched into a pipeline, carry instrumentation onboard which enables them to gather and record information about problems such as denting, corrosion, and cracking. More basic pigs, on the other hand, look after the routine internal maintenance chores such as cleaning and swabbing, or else perform operational duties such as batching different types of product along the line. The harsh environment in which pigs often operate is described. Aside from the mechanical shocks they undergo when passing welds, bends, and other fittings, they may have to contend with hostile conditions such as hydrogen sulfide environments. High pressure is another factor to consider. In crude oil lines, significant paraffin deposits also can cause problems if they affect the sensors ability to maintain good contact with the pipe wall. In spite of these ...
This article describes the project for the installation of an additional emergency diesel generator in both Asco and Vandellos NPPs. The basic objectives of this project are to improve the availability of the emergency generation system, in order to provide greater ability to address potential contingencies, and also to increase the flexibility of the preventive periodic maintenance of the emergency diesel generators. This maintenance, that is currently a milestone of the critical path of the refueling outage, will be performed on-line. The new diesel generator will be sized to support all the loads considered in the safety case and also the consumption of its own auxiliary systems, and will be tested for operability assessment on the same periodical basis than the existing ones. The solution adopted will also permit that the N diesel generator may be connected to any bus bar class 1E in a station black-out scenario. (Author)
Operation and maintenance cost estimating methodologies for advanced coal-fired atmospheric circulating fluidized-bed and advanced natural gas-fired combined cycle electric power plants are presented. The purpose of these cost estimating relationships is for use in long range planning and evaluation of the economics of use of these technologies for electric power generation. Projected annual costs of reference plants at ten different sites in the United States, one in each of the ten DOE regions, are given as of 1989, and comparisons are made with existing technologies. A listing of a computer program implementing the methodologies is included. 14 refs., 4 figs., 13 tabs.
Abstract Background Atopic dermatitis (AD) affects health and quality of life and it has great impact on both health-care costs and costs to the society. Objectives The objective of this study was to develop a model to analyse the cost-effectiveness of a barrier-strengthening moisturizing cream as maintenance therapy compared with no treatment after initial treatment with betamethasone valerate in adult patients with AD in Sweden. A further aim was to apply a similar health-economic analysis for Denmark, Norway and Finland. Methods A Markov simulation model was developed including data from three sources: (i) efficacy data from a randomized controlled trial including patients with moderate AD treated with either a moisturizing cream or no treatment, (ii) resource utilization and quality of...
Goldstein SL, Mattoo TK, Morgenstern B, Martz K, Stablein D, Talley L. Anemia and growth status in pediatric patients receiving maintenance dialysis after a failed renal transplant course: An NAPRTCS report.Pediatr Transplantation 2006. Copyright 2006 Blackwell Munksgaard Abstract: We conducted a retrospective review of the North American Renal Transplant Cooperative Study (NAPRTCS) Registry transplant and dialysis arms to assess anemia and growth patterns in children who returned to dialysis after a failed renal transplant from January 1, 1992 to February 3, 2004. Of the 1807 potential study subjects, 1451 had transplant removal data (TxIn vs. TxOut) available for analysis. Four hundred and twenty-one of 1451 patients (29%) had a transplant nephrectomy at the time of entry into the NAPRTC...
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
A decision must be made regarding whether the United State`s stockpile of neptunium should be discarded into the waste stream or kept for the production of Pu-238. Although the cost of long term storage is not inconsequential, to dispose of the material means the closing of our option to maintain control over our Pu-238 stockpile. Within the Fuels and Materials Examination Facility at Hanford there exists a remotely operated facility that can be converted for neptunium storage. This paper describes the facility and the anticipated handling requirements.
This work presents and describes the natural radioactive occurrence in oil facilities. The origins of the detected radioactivity and the reasons of its settlement are discussed. The measurements results carried out in oil facilities in the Neuquina basin (Argentine) are shown in this work. The aim is to describe the actual situation and to evaluate the magnitude of the problem. Finally, recommendations are proposed to protect the health of the workers, especially of those who carry out the cleaning of the equipment, and to guarantee an appropriate final disposal for the generated radioactive residuals. (author)
This report describes a high explosives test facility that makes efficient use of equipment and combines utility, convenience, and safety in a modest amount of space. It is a dedicated facility for exploratory development efforts that previously were conducted in a single room having very limited capabilities. Two explosives testing areas are now available and several projects are supported concurrently.
The free electron laser (FEL) FLASH at DESY in Hamburg is the first x-ray FEL ever built. Many new developments were necessary in order to exploit the unique properties of this novel light source for scientific experiments. The facility has constantly been improved and several major upgrades have been made or are currently underway. This paper reviews the main characteristics of the user facility as well as the major developments and upgrades.
A thermal neutron imaging facility for real-time neutron radiography and computed tomography has recently been developed and built at the University of Texas TRIGA reactor. Herein the authors present preliminary results of radiography and tomography test experiments. These preliminary results showed that the beam is of high quality and is suitable for radiography and tomography applications. A more detailed description of the facility is given elsewhere.
A thermal neutron imaging facility for real-time neutron radiography and computed tomography has recently been developed and built at the University of Texas TRIGA reactor. Herein the authors present preliminary results of radiography and tomography test experiments. These preliminary results showed that the beam is of high quality and is suitable for radiography and tomography applications. A more detailed description of the facility is given elsewhere
This monograph addresses a narrow aspect of cold regions engineering, namely the effects of cold weather on the traditional civil engineering disciplines of hydrology and hydraulics. Hydrologic and hydraulic considerations in the design, construction, and operation of civil works are very important. Many of the problems encountered in the design and construction of buildings, transportation systems, water supply facilities, waste treatment facilities, and hazardous waste disposal facilities, for example are closely tied to the characteristics of the site hydrology.
The presentation gives a brief insight on possibility of using the VEERA facility in studying the stratification phenomenon. The idea for such experiments is to use the facility upper plenum part to simulate the conditions in upper part of horizontal steam generator hot collector. The upper part of steam generator hot collector is one of the locations where the stratification can take part during natural circulation mode. 4 refs.
This ACDR was performed following completed of the Conceptual Design Report in July 1992; the work encompassed August 1992 to January 1994. Mission of the WRAP Module 2A facility is to receive, process, package, certify, and ship for permanent burial at the Hanford site disposal facilities the Category 1 and 3 contact handled low-level radioactive mixed wastes that are currently in retrievable storage at Hanford and are forecast to be generated over the next 30 years by Hanford, and waste to be shipped to Hanford from about DOE sites. This volume provides an introduction to the ACDR process and the scope of the task along with a project summary of the facility, treatment technologies, cost, and schedule. Major areas of departure from the CDR are highlighted. Descriptions of the facility layout and operations are included.
Multi-kilo-electron-volt x-ray microscopy will be an important laser-produced plasma diagnostic at future megajoule facilities such as the National Ignition Facility (NIF). However, laser energies and plasma characteristics imply that x-ray microscopy will be more challenging at NIF than at existing facilities. We use analytical estimates and numerical ray tracing to investigate several instrumentation options in detail, and we conclude that near-normal-incidence single spherical or toroidal crystals may offer the best general solution for high-energy x-ray microscopy at NIF and similar large facilities. Apertured Kirkpatrick{endash}Baez microscopes using multilayer mirrors may also be good options, particularly for applications requiring one-dimensional imaging over narrow fields of view. {copyright} 1998 Optical Society of America
This report estimates the economic and financial effects and the benefits of compliance with the proposed effluent limitations guidelines and standards for the Centralized Waste Treatment (CWT) industry. The Environmental Protection Agency (EPA) has measured these impacts in terms of changes in the profitability of waste treatment operations at CWT facilities, changes in market prices to CWT services, and changes in the quantities of waste management at CWT facilities in six geographic regions. EPA has also examined the impacts on companies owning CWT facilities (including impacts on small entities), on communities in which CWT facilities are located, and on environmental justice. EPA examined the benefits to society of the CWT effluent limitations guidelines and standards by examining cancer and non-cancer health effects of the regulation, recreational benefits, and cost savings to publicly owned ...
The neutron radiography facility was installed at the tangential beam port of the 3 MW TRIGA MARK-II research reactor. In the facility only direct film neutron radiography method is being used. The project involves development of electronic imaging system for real time neutron radiography in the existing facility with the aim of utilizing it for research and industrial applications. In establishing the electronic imaging system for real time neutron radiography the improvements of existing facility were almost done during this period. In parallel, the former facility was used for the research: (a) A study of wood and wood plastic composites with and without additive by using film neutron radiography and (b) A study of jute reinforced polymer composites by using film neutron radiography technique. (author)
The Decree specifies basic quality assurance requirements applicable to machines, their parts and materials, civil engineering structures, means for automated control of technological processes including hardware and software, and electricity supply systems related to nuclear safety of nuclear facilities, and stipulates binding procedures for the implementation of technical and organizational provisions associated with the quality of selected equipment to ensure nuclear safety of nuclear facilities. Safety classes are defined for selected equipment. Requirements laid on safety assurance documentation are specified, and requirements placed on safety assurance programmes, their preparation, finalization and approval are defined. Quality assurance requirements are also specified with respect to the designing, manufacture, construction, operation, repair, modification and decommissioning of nuclear facilities. The Decree ...
The Materials & Fuel Complex (MFC) facilities 799 Sodium Processing Facility (a single building consisting of two areas: the Sodium Process Area (SPA) and the Carbonate Process Area (CPA), 799A Caustic Storage Area, and 770C Nuclear Calibration Laboratory have been declared excess to future Department of Energy mission requirements. Transfer of these facilities from Nuclear Energy to Environmental Management, and an associated schedule for doing so, have been agreed upon by the two offices. The prerequisites for this transfer to occur are the removal of nonexcess materials and chemical inventory, deinventory of the calibration source in MFC-770C, and the rerouting and/or isolation of utility and service systems. This report provides a description of the current physical condition and any hazards (material, chemical, nuclear or occupational) that may be associated with past operations of these ...
This report presents results of the 1st regular inspection of the No.2 unit of the Sendai Nuclear Power Plant. It was carried out during the period from September 22, 1986, to December 24, 1986. The inspection covered the main unit of the nuclear reactor, facilities for the nuclear reactor cooling system, facilities for the instrumentation control system, fuel facilities, radiation control facilities, disposal facilities, nuclear reactor containment facilities, and emergency power generation system. Checking of appearance, disassemblage, leak and functions-performance of these facilities was conducted and no abnormalities were found. All operations involved in the inspection were performed under conditions within the permissible dose as specified in the applicable laws. No major modification work was carried out during the period of the ...
This report presents results of the 1st regular inspection of the No. 2 unit of the Sendai Nuclear Power Plant. It was carried out during the period from September 22, 1986, to December 24, 1986. The inspection covered the main unit of the nuclear reactor, facilities for the nuclear reactor cooling system, facilities for the instrumentation control system, fuel facilities, radiation control facilities, disposal facilities, nuclear reactor containment facilities, and emergency power generation system. Checking of appearance, disassemblage, leak and functions-performance of these facilities was conducted and no abnormalities were found. All operations involved in the inspection were performed under conditions within the permissible dose as specified in the applicable laws. No major modification work was carried out during the period of the ...
In the fuel testing facilities of Japan Atomic Energy Research Institute, the post-irradiation test of practical fuel used in nuclear power stations was begun in December, 1979, and the soundness of practical fuel has been confirmed, and the valuable post-irradiation test data on the behavior of fuel have been acquired. Recently, the heightening of fuel burnup has been advanced, and also in fuel testing facilities, the development and preparation of the post-irradiation testing facility required for examining in detail high burnup fuel have been carried out. The course of the installation of the post-irradiation testing facility and the outline of the facility are reported. As the preparation of the post-irradiation testing facility for high burnup fuel, a hyperfine hardness tester that measures dynamic hardness, the measuring instrument for pellet thermal ...
The power source facilities of JT-60 consist of poloidal magnetic coil power source, toroidal magnetic coil power source, the power generation facility for heating, operation power distribution facility and secondary cooling facility, and at the time of the experiment operation of JT-60, they supply 1300 MVA of instantaneous maximum power to loads. The component machinery and equipment of the power source facilities are installed in about 20 indoor and outdoor places, and their mounted parts are about 15,000 kinds. About 3,000 kinds of spare parts are preserved in 15 exclusively used stores. The managing system for mounted parts and spare parts of JT-60 power source facilities which possesses the functions of rapidly and efficiently carrying out the storage of large quantity of information, mutual relating and retrieval by making mounted parts and spare parts ...
This study examined the atmospheric pollution created by some waste treatment and disposal facilities in the State of Kuwait. Air monitoring was conducted in a municipal wastewater treatment plant, an industrial wastewater treatment plant established in a petroleum refinery, and at a landfill site used for disposal of solid wastes. Such plants were selected as models for waste treatment and disposal facilities in the Arabian Gulf region and elsewhere. Air measurements were made over a period of 6 months and included levels of gaseous emissions as well as concentrations of volatile organic compounds (VOCs). Samples of gas and bioaerosols were collected from ambient air surrounding the treatment facilities. The results obtained from this study have indicated the presence of VOCs and other gaseous pollutants such as methane, ammonia, and hydrogen sulphide in air surrounding the waste treatment and disposal ...
Recent developments in cross-linked polyethylene cables mean they can be used at higher voltages and are starting to replace some oil-filled cables. Their good thermal and electrical properties, easy installation and minimal maintenance have helped their growth. A group at Sumitomo Electric Industries Ltd., Japan is studying the performance of these cables. (author).
The vortex amplifier controller has no moving parts and therefore it can have extremely high reliability and avoid the maintenance problems associated with contaminated equipment. The vortex amplifier and its application to ventilation control of radioactive enclosures is described. Reverse purge vortex amplifier ventilation system control is also discussed. (U.K.).
The report presents technical and economical aspects of underground cables compared to overhead lines in Norway in high voltage transmission systems above 22 kV. The economical comparison between the two options includes capital costs of installation (investment costs), maintenance costs and costs of electrical losses. The main technical issues discussed are reliability and flexibility. 35 refs., 23 figs., 29 tabs.
Information is presented concerning the Materials Open Test Assembly (MOTA); instrumentation and control system; MOTA neutronic data; pressurized tube specimens; stress-rupture measurements for reactor materials; miniature specimen design; the Interim Examination and Maintenance (IEM) cell at the FFTF; support services; and general information concerning the FFTF.
Background/AimsFabry disease is an X-linked recessive and progressive disease caused by α-galactosidase A (α-GaL A) deficiency. We sought to assess the prevalence...Full Text Available
The author reports 10 studies concerning the diagnosis of renal osteodystrophy and extraskeletal calcification in patients on maintenance hemodialysis as well as some aspects of persistent hyperparathyroidism after renal transplantation. The majority of the studies focus on the value of bone scintigraphy with Tc-99m HEDP in the diagnosis of these disorders. (Auth.).
As a maintenance optimization project to improve the safety of Wolsung NPP (Nuclear Power Plant), reliability of diesel generators are estimated based on the operating experience, and improvement options are suggested. A reliability measure is suggested for the estimation of reliability for standby safety systems to reflect availability. It is assessed that the reliability of diesel generators can be mush improved if the suggested improvement options are implemented. (Author) 6 refs., 1 tab.
The paper deals with the disposal of radioactive waste and the plans for dealing with solid wastes of intermediate and low levels of activity, which are the responsibility of NIREX. NIREX is an executive body which co-ordinates the waste-disposal plans of the main radioactive waste producers. The disposal routes for the active wastes are described including the deep disposal of wastes containing material that will remain active for thousands of years. Requirements for deep burial are outlined with reference to the geology and hydrogeology of the site. Monitoring, maintenance and surveillance are mentioned for the protection of the public.
A tiered communications architecture for managing network traffic in a distributed system. Communication between client or control computers and a plurality of hardware devices is administered by agent and monitor devices whose activities are coordinated to reduce the number of open channels or sockets. The communications architecture also improves the transparency and scalability of the distributed system by reducing network mapping dependence. The architecture is desirably implemented in a proton beam therapy system to provide flexible security policies which improve patent safety and facilitate system maintenance and development.
Technical studies on constructing the J-PARC (Japan Proton Accelerator Research Complex) are presented by five authors: (1) on the wiring for electromagnets of the 50 GeV synchrotron, (2) on the fast beam-extraction from the 50 GeV synchrotron into two opposite directions, (3) on the target chamber system for the generation of muons, (4) on the design of large aperture electromagnets, and (5) on the maintenance and control of the electromagnet power supplies. (K.Y.)
This book contains the proceedings of the International Topical Meeting on Remote Systems and Robotics in Hostile Environments. It is organized under the following sessions: Worldwide Applications Overview; Operating Mobile Systems; Sensors and Control Systems; Space Applications; Reactor Operations and Surveillance; Remote Equipment for Hazardous Operations; Future Mobile System; Mining and Construction Operations; Special Applications; Hot Cell Applications; Processing; Reactor Operations and Maintenance; Decontamination and Waste Handling; Remote Handling Development and Demonstration.
DescriptionThe overall objective of the project is to provide an improved understanding of the processes and linkages through which organic carbon additions influence soil bio-physical and physico-chemical properties. Soil organic carbon (SOC) levels and turnover rates are intimately linked to the soil properties that are important in the maintenance of soil quality and fertility, and sustainable crop production. However, it has been difficult to distinguish the various processes and linkages through which [continued...
The WIT telemanagement system simply, reliably and efficient by makes available to us in real time processed, ordered and managed data. Such information has been used to optimise the performance of the drinking water distribution networks on a number of housing estates. This has led to major saving in consumption and on equipment maintenance, thereby improving customer service and obtaining a more rational use of piped water. (Author)
Asean Brown Boveri (ABB) developed Glass (Global access for service and support), a monitoring system for the remote control and management of ABB supplied equipment and other equipment through the Internet. Glass can be applied for many different systems, e.g. automated substations of electric power distribution systems or train equipment
Brief summaries of research work are presented in the following section: overview of the ORNL Instrumentation and Controls Division activities; new developments and methods; reactor instrumentation and controls; measurement and control engineering; electronic engineering; maintenance; studies; services; and development; and division achievements.
Heat pumps can be installed indoors or outdoors. H. Klein investigates which site would be preferable for a one-family house. Advantages and disadvantages with regard to necessary space, noise, maintenance and repair are discussed; heat losses in both cases of installations are dealt with. Mathematic calculation shows that indoor installation is safer and more adequate in terms of energy savings.
United States Air Force security forces have a central role in force protection. Their missions include military police services, installation security, air base defense, military working dog functions, and combat arms training and maintenance. Surveys in...
In a reactor environment, the surface of a limiter or wall is primarily determined by the mechanism of erosion and deposition of surface material. It should be possible to use pellet injection to reduce net erosion to zero everywhere if low-Z materials are used for the surface. Erosion rates can, in general, be minimized by large area limiters and high plasma temperatures, which transmit power to the walls with less sputtering. Under ideal steady state conditions the wall surface is dominated by metallurgical effects in the wall.
The National Renewable Energy Laboratory (NREL) evaluated the performance of diesel, compressed natural gas (CNG), and hybrid electric (equipped with BAE Systems? HybriDrive propulsion system) transit buses at New York City Transit (NYCT). CNG, Gen I and Gen II hybrid electric propulsion systems were compared on fuel economy, maintenance and operating costs per mile, and reliability.
The requirements of high-pressure compressors increase. The customers wish still larger quantities of delivery with smaller employment of achievement, minimal oil consumption, service amenability, long intervals of maintenance and so forth. For this, the author of the contribution under consideration presents two series of modular developed high-pressure compressors in compact design for industrial air and technical gases which exactly fulfil these requirements.
This publication presents 5 years (1990--94) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. Generator and nongenerator summaries are presented. Composite tables present: Aggregates of income statement and balance sheet data, financial indicators, electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data.
Due to the fast cooling of steam turbines, the shutdown time during maintenance or when repairing faults and damage can be shortened. This booklet describes various processes for cooling steam turbines. It is recommended that fast cooling should be planned in designing new plants and corresponding arrangements should be provided in the form of pipe connections and valves. (DG).
Although human T-cell lymphotropic virus type I (HTLV-I) is the etiologic agent of adult T-cell leukemia/lymphoma (ATL), the role of viral gene expression in the progression to and maintenance of the...Full Text Available
... and pathogen transmission. Because the ultimate object of stem cell research is cell-based clinical therapy, hES cells should ... 4%) Supported by grants (SC12021 and SC11012) from Stem Cell Research...
The use of an SCR-controlled power system on an offshore drilling rig has lead to an increased acceptance of high technology equipment. Such equipment increases drilling productivity, reduces maintenance, and improves reliability. Most new rigs now have AC squirrel cage motors, brushless AC generators, silicon controlled rectifiers, DC motors, and swtichgear and motor starters. Several opportunities for cost reductions in SCR systems, such as improving the power factor, are studied in this paper.
The purpose of this research was to investigate the de-entrainment of boron for evaporators used in nuclear power plants. The forced circulation and semi-continuous type evaporator was used in the experiment. Cyclone and glass-wool packed column which is supposed to provide good decontamination factor as well as easy maintenance, were selected as de-entrainment device to be used in the evaporation of radioactive liquid wastes. The de-entrainment device combined with cyclone and glass-wool column has shown overall DF more than 1000 for boron.
The 1993-1995 period represents a time of significant transition for workers engages in nuclear-related activities. Total nuclear-related employment fell markedly from about 300,000 workers in 1993 to 265, 000 in 1995, a 12% decline. This is the lowest level since the 1970s. In 1995, a third of all nuclear-related employment was in the reactor operation and maintenance segment. 6 figs, 1 table.
Within this paper the potentialities of using networked embedded systems will be discussed. New embedded hardware with network connectivity allows remote administration and software updates of solar thermal system controllers via internet. System self analysis helps to minimize breakdown times by sending email and SMS to request maintenance staff. (orig.)
Theoretical and practical aspects of anodic protection for control of corrosion by a wide range of acidic and alkaline solutions are discussed. Chapters are included concerning strategic importance of metals and alloys in modern industry, applications to industrial equipment, descriptions of equipment used in the technique; design, operation and maintenance; economics, scientific principles, characteristics of potentiostats, laboratory tests and procedures, selected application examples and projected future uses. A section is devoted to electrochemical principles.
This presentation summarizes the present upgrade R&D projects in the TileCal collaboration. One project studies the possibility to divide the drawers into smaller minidrawers to simplify maintenance. There are three different front-end projects. There are also projects dealing with high voltage and low voltage distribution, projects for developing PMT dividers, low voltage electronics, data transmission and off-detector electronics.