Reliability analysis of the downstream face of a rockfill dam. Introductory work
Energy Technology Data Exchange (ETDEWEB)
Reliability analysis is now being used to a large extent for several civil engineering structures. Such analysis has not been used for rockfill dams, the most common dams in Norway. Following work on reliability analysis for breakwaters, reliability analysis was then used to investigate the ability of the stone material on the upstream face of a rockfill dam to withstand wind generated waves. An attempt is made to follow up this work by including discharge overtopping on a rockfill dam in a reliability analysis. This report primarily goes through previous work on the required weight of protective stones on the downstream face of the dam for specified discharges over the dam and also deals with the probability formulation of extreme floods. A failure function with partial coefficients is formulated. But for reasons of economy the calibration of the partial ...
1995-02-01
Stochastic aspects of dam safety analysis
Energy Technology Data Exchange (ETDEWEB)
A stochastic analysis is presented of the probability of overtopping of a dam. The discussion is based on the case of a dam for a small water storage reservoir which has recently been constructed in the Saar district in the FRG. The problem is first solved by means of a simulation method. However, it is possible to describe the result of the sumulation method by means of a much simpler model which is based on a solution of the failure integral of Freudenthal for uncorrelated resistances and loads. It is shown that the actual safety of this dam against overtopping is extremely sensitive to both the operation rule for the reservoir, and the freeboard allowance. Some general conclusions are derived from this study for assisting in the ongoing discussion of dam safety. (6 figs, 1 tab, 7 refs)
1988-05-15
International water power and dam construction handbook
Energy Technology Data Exchange (ETDEWEB)
The first section of this Handbook describes hydro-electric projects currently under construction or recently commissioned in a number of countries. The major part of the Handbook is devoted to lists of data relating to hydro-electric plants and hydromachinery. These include: data for 1990 submitted by national power authorities on hydro-electric and pumped-storage plants in operation, under construction or planned; more detailed data for pumped-storage plants; country by country data on the dimensions, and reservoir and electrical capacity of major dams and hydro plant; a listing of roller compacted concrete dams; a listing of the world's largest turbines giving data on the largest unit at each scheme in rank order ranging from a unit capacity of 838 MV down to 147 MV; a similar list of the largest hydrogenerators ranging from a unit capacity of 825 MVA down to 150 MVA; details of turbine and ...
1992-01-01
Expectations of immortality: dam safety management into the next millennium
Energy Technology Data Exchange (ETDEWEB)
Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using ...
1999-07-01
Energy Technology Data Exchange (ETDEWEB)
In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the ...
1998-02-01
Energy Technology Data Exchange (ETDEWEB)
Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation ...
2004-01-01
British Library Electronic Table of Contents (United Kingdom)
Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It the...
2011-01-01
Environmental-impact assessment of dams and reservoir projects (review and a case study)
International Nuclear Information System (INIS)
Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness ...
Energy Technology Data Exchange (ETDEWEB)
This issue of Barrages newsletter comprises three articles. The first article treats of the quality approach relative to the organization of the inspections of big and medium size dams. It summarizes the improvements of this approach added in 2003 after analysis of the experience feedback. The second article presents the conclusions of the decennial and annual inspections of dams in exploitation. Only the observations requiring a special follow-up are reported. The last article summarizes the activities of the control services for the third quarter of 2003: decennial and annual visits, important facts, administrative instructions, studies, projects and works, organization of services, technical studies etc.. (J.S.)
2003-07-01
Mechanism for breaking up (agglomerate) dams and removal of part of a pitch coke sinter cake
Energy Technology Data Exchange (ETDEWEB)
The guiding mechanism is attached by a hinge (swivel) to the supporting frame, and the frame is equipped by hinges (swivels) with hydraulic or pneumatic cylinders mounted on its ends and is attached by hinges (swivels) to the coke ejector and guide respectively. This increases the productivity and efficiency of operating the system.
1981-08-23
Pumped storage plants 20 are a relatively common type.They use a dam to create an upper reservoir ...Some pumped storage plants use the same water turbine and electric generator for both operating periods.That is,
Pumped storage plants are a relatively common type.They use a dam to create an upper reservoir ...Some pumped storage plants use the same water turbine and electric generator for both operating periods.
Application of a polycarboxylate ether admixture in RCC dam construction[ACI SP-239
Energy Technology Data Exchange (ETDEWEB)
Chemical admixtures are used in dam construction to improve plasticity of the dry materials mixture over time. Roller compacted concrete (RCC) has been used on many dam projects in China. However, the use of RCC has frequently resulted in water reduction problems. This paper provided details of an admixture based on polycarboxylate ether (PCE) which was developed to improve the quality of RCC constructions at the JinHong dam in China. Use of the polymer at the JinHong dam resulted in a vibration sensitive concrete that was sustained over time. Under identical mix-design and compaction conditions in the laboratory, specific gravity of the RCC was increased from 2417 kg/m{sup 3} to 2463 kg/m{sup 3}. The high specific gravity of the material resulted in satisfactory strength data from the dam project. The key-ratio of the splitting tensile ...
2006-07-01
Probabilistic seismic and geotechnical evaluation at a dam site
Energy Technology Data Exchange (ETDEWEB)
This report examines the use of probabilistic methods in dealing with the problem of potential earthquake-induced liquefaction of foundation soils at an example dam site located in the central United States, near the New Madrid earthquake zone. The example dam is assumed to be a 1-mile long rolled-filled embankment founded on a 100-ft deep deposit of interbedded alluvial gravels, sands, silts, and clays. The study is seen as an opportunity to examine probabilistic concepts and procedures in the framework of an example engineering project. In this context, the main practical value of a probabilistic approach is that it permits more informed decision making about further data acquisition, additional engineering analysis, and if necessary, remedial action. The specific aim of the study is to show how probabilistic procedures complement and help to reinterpret the results of deterministic (earthquake-induced) liquefaction ...
1983-09-01
AAR in concrete of Asejire spillway (OYO state - Nigeria)
Energy Technology Data Exchange (ETDEWEB)
The Asejire dam at Ibadan, Nigeria was constructed in the late sixties for the purpose of providing water for the city of Ibadan (presently about 4,5 million inhabitants). It is located on the Oshun river approximately fifteen miles from the city. In 1982 cracks were observed on the wing walls and although these continued to develop, no attempt was made at that time to investigate their causes and no repair was carried out. In 1989 the SGI ENGINEERING Group of Geneva, Switzerland was appointed as the consultant for the complete refurbishment of the Asejire water scheme. The consortium Degremont-Poat-Clemessy was awarded the contract for the project. The African Development Bank and the Nigerian Government have provided the loan to finance the project.
1995-12-31
Port Pirie rare earths plant stage 3
International Nuclear Information System (INIS)
SX Holdings Limited intends to establish a rare earths plant at Port Pirie, South Australia. The proposal involves three stages of development, Stage 3 being to develop a monazite cracking plant and associated rare earths separation facility with the capacity to process up to 8,000 t/a of monazite-type ores. The proposed initial capacity is 4,000 t/a. This Draft Environmental Impact Statement relates to Stage 3 and is based on a monazite processing capacity of 8,000 t/a. The justification of the project is given in terms of use and the market for rare earths, the economic and environmental benefits of the proposal, the site selection process, site rehabilitation, and the consequences of not proceeding. A detailed description of the project is given, including the treatment process, site development and facilities, the supply of raw materials, product and waste handling, transport and storage, plant commissioning, operation ...
International Nuclear Information System (INIS)
Diurnal and seasonal thermal constancy, a greatly delayed seasonal temperature maximum, and summer cool and winter warm conditions characterize the stream environment below a deep-release dam in Colorado. Low diversity index and equitability values and changes in macroinvertebrate species composition may result from failure of the temperature regime to provide the thermal stimuli essential for various life-cycle phenomena. It is hypothesized that the following sublethal effects, directly or indirectly resulting from the modified temperature regime, may further alter macroinvertebrate community structure: reduction of niche overlap and a shift toward an equilibrium community as a consequence of reduced environmental fluctuation; more intense competition associated with greater productivity; elimination of major invertebrate predators; and failure of the limited temperature range to provide optimal temperatures for various physiological processes. Effects of the ...
High volume fly ash RCC for dams - I : mixture optimization and mechanical properties
Energy Technology Data Exchange (ETDEWEB)
Roller compacted concretes (RCC) were developed for the Norwegian Skjerka hydropower project. RCCs were developed to have a high-volume fly ash content to address environmental issues, including the reduction of carbon dioxide emissions associated with dam construction. They also makes good use of waste product and conserve natural resources. This study examined a series of mixtures to determine the appropriateness of using RCC as a competing alternative to the traditional rock fill dam proposed for the Skjerka hydropower project. The main advantage of RCC is speed, allowing a relatively large dam to be constructed in just one summer season, saving financial costs and providing early return on the investment. In addition, fly ash can be used in the structure, using clean and renewable energy. Several procedures to proportion RCC mixtures were proposed, including the optimal paste ...
2001-07-01
Snake River Fall Chinook Salmon Life History Investigations, Annual Report 2008.
Energy Technology Data Exchange (ETDEWEB)
This study was initiated to provide empirical data and analyses on the dam passage timing, travel rate, survival, and life history variation of fall Chinook salmon that are produced in the Clearwater River. The area of interest for this study focuses on the lower four miles of the Clearwater River and its confluence with the Snake River because this is an area where many fish delay their seaward migration. The goal of the project is to increase our understanding of the environmental and biological factors that affect juvenile life history of fall Chinook salmon in the Clearwater River. The following summaries are provided for each of the individual chapters in this report.
2009-09-15
Lower Flathead System Fisheries Study, Executive Summary, Volume I, 1983-1987 Final Report.
Energy Technology Data Exchange (ETDEWEB)
This Executive Summary, Volume I, of the lower Flathead System Fisheries Study Final Report, was prepared to provide a study overview for persons who are not fisheries scientists. The contents provide an introduction to the study and its objectives, a short description of the study area, a discussion of the major findings and conclusions of the study, and the description of fisheries management alternatives available to managers of the lower Flathead system. Technical reports were prepared for those portions of the study dealing with the lower Flathead River and its tributaries, Volume II, and the South Bay of Flathead Lake, Volume III. The annual hydrographic regime of the Flathead system, consisting of upper rivers, lake and lower river, has been modified by the construction and operation of two major hydroelectric facilities, Hungry Horse Dam on the south fork Flathead River and Kerr Dam at the outlet of Flathead Lake. ...
1988-06-01
Energy Technology Data Exchange (ETDEWEB)
This document represents the FY2002 BPA contract Statement of Work for the Yakama Nation (YN) portion of the project entitled 'Assessment of current and potential salmonid production in Rattlesnake Creek associated with restoration efforts'. The purpose of the project is to complete detailed surveys of water quality, fish populations, habitat conditions and riparian health in the Rattlesnake Creek sub-basin of the White Salmon River in south central Washington. Results of the surveys will be used to establish Rattlesnake Creek sub-basin baseline environmental factors prior to anticipated removal of Condit Dam in 2006 and enable cost-effective formulation of future watershed restoration strategies.
2003-05-01
Modelling and measurement of radon diffusion through soil for application on mine tailings dams
International Nuclear Information System (INIS)
The mine dumps that arise from the gold mining operations in South Africa are a potential source of high concentrations of radon (222"Rn). Studying the diffusion of radon and the emanation from the soil will help to deduce the radon flux from these dumps to identify the problem areas for rehabilitation. This study describes measurements of the emanation coefficient and the modelling of the depth profile of the radon activity concentration, which is compared to a depth profile that was measured on such a mine dump. Emanation coefficients ranging from 0.13 to 0.39 have been obtained.
2005-04-01
Anticipated climate change impacts on flood characteristics : Moisie River application
International Nuclear Information System (INIS)
The issue of global warming was discussed with particular reference to the changes that may occur in the hydrological regime within the coming decades in response to predicted changes in climate. Flood events for the 2050 time horizon were investigated along with the consequences on water management and dam safety. Dams operated by Hydro-Quebec are used for flood control, water supply, recreational activities and hydroelectricity. As such, the electric utility relies on methods to evaluate the adaptability of current management plans to climate change. This paper presented the results of a study conducted at the Moisie River watershed, located in northern Quebec. The HSAMI hydrologic model was used to evaluate and compare the occurrences where stream flows and water levels exceed critical values in order to assess the effectiveness of management plans in both current and climate change scenarios. The study considered two ...
Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association
Energy Technology Data Exchange (ETDEWEB)
The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: ...
1999-07-01
Energy Technology Data Exchange (ETDEWEB)
The French office for technical studies and control of big dams (BETCGB), has recently reedited the `guidebook for the control of dams in exploitation`. The aim of this document is to provide to the regional directions of industry, research and environment (DRIRE) a methodological help for their control actions of hydroelectric dams granted for exploitation. It comprises 6 chapters dealing with: the different type of dams, the inspection, the surveillance, the floods evacuation, the flood instructions, and the particular emergency plans. (J.S.)
1998-12-31
International Water Power and Dam Construction Handbook 1993
Energy Technology Data Exchange (ETDEWEB)
In this handbook, technical reports on a number of hydro plants under construction are provided. In addition tables of compiled data are presented on a world-wide basis for the following: turbine and hydro generator contracts; hydropower resource potential and development; pumped storage plants; the major dams and hydro plants; roller compacted concrete dams and concrete faced rockfill dams; small hydropower. An address database of international organizations of relevance to hydropower development, national power authorities and nation committees of the International Commission an Large Dams is included. A final and major section of the handbook is a buyer's guide providing extensive company data and information on products and services. (UK)
1993-01-01
A risk based approach to assess the incidence of ice loads on small concrete dams
International Nuclear Information System (INIS)
Some considerations regarding ice load in risk-based dam safety analysis are presented for small concrete dams. The most significant physical mechanisms leading to ice thrust on dams (such as thermal expansion and water level fluctuations) are outlined. Published literature on dam ice loads to examine ice load magnitude-return period relationships, sliding and overstressing failure mechanisms and structural performance criteria to resist ice loads, are also reviewed. Related loading combinations for structural safety evaluations were determined regarding the issue of simultaneity of ice loads with other events such as earthquakes. Parametric analyses were conducted on a small gravity dam section, 3m high, and a taller dam, 17.9 m high, to demonstrate the ultimate ice load carrying capability as a function of dam geometry and shear and ...
Variable-speed generation enhances hydro operation
Energy Technology Data Exchange (ETDEWEB)
Two major developments have given impetus to wider adoption of variable-speed turbine/generators in hydroelectric plants, both essentially environmental: (1) the need for stream-bed stability below river dams, and (2) the need to minimize fish damage. Also, the need to stabilize pumped-storage and generating efficiencies to match extreme changes in head levels has been a driving force. Variable-speed operation in hydro applications is relatively new to North America. In other parts of the world, it has been used in pumped-storage plants since 1971. In the US, and increasing potential exists for variable-speed hydro, considering the 30 pumped-storage plants already in operation and several river plants struggling with high head fluctuations--including four at stations operated by the Bonneville Power Administration. Several modifications to hydro-plant hardware and operating ...
1993-07-01
Planning and Operation of Commercial Application Center
Energy Technology Data Exchange (ETDEWEB)
The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project.
2003-06-15
International water power and dam construction yearbook 1996
Energy Technology Data Exchange (ETDEWEB)
This document draws together data on hydroelectric power generation and dam construction for 1996. Machinery such as turbines and hydroelectric generators are listed together with their manufacturers. Contact addresses for international organizations concerned with water power are listed. Listings are also given for hydro resources worldwide, and the global distribution of pumped-storage plants, dams and hydroelectric plants. Company data is also listed providing a buyer`s guide for 1996. (UK)
1996-12-31
T Plant secondary containment and leak detection upgrades
Energy Technology Data Exchange (ETDEWEB)
The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.
1995-10-19
Radiation induced micrencephaly in guinea pigs
International Nuclear Information System (INIS)
A brain weight deficit of about 70 mg was induced at doses of approximately 75-mGy and a deficit of 60 mg was induced at 100 mGy. This confirms the effects projected and observed by Wanner and Edwards. Although the data do not demonstrate a clear dose-response relationship between the 75-mGy and 100-mGy groups, the data are statistically consistent with a dose-response effect because of the overlapping confidence intervals. The lack of a statistically significant observation is most likely related to the small difference in doses and the limited numbers of animals examined. There are several factors that can influence the brain weight of guinea pig pups, such as caging and housing conditions, the sex of the animal, and litter size. These should be taken into account for accurate analysis. Dam weight did not appear to have a significant effect. The confirmation of a micrencephalic effect induced x rays at doses of 75-mGy during this late ...
2006-04-20
Energy Technology Data Exchange (ETDEWEB)
This report is an overview of Pacific Northwest Laboratory's (PNL) research on how hydroelectric generation affects aquatic biota and environments. The major accomplishments of this research are described, and additional work needed to permit optimal use of available data is identified. The research goals are to: (1) identify impacts of hydroelectric generation, (2) provide guidance in allocating scarce water resources, and (3) develop techniques to avoid or reduce the impacts on aquatic communities or to compensate for unavoidable impacts. Through laboratory and field experiments, an understanding is being developed of the generic impacts of hydrogeneration. Because PNL is located near the Columbia River, which is extensively developed for hydroelectric generation, it is used as a natural laboratory for studying a large-scale operating system. Although the impacts studied result from a particular system of dams and ...
1981-05-01
Operant behavior of rats exposed to lead before or after weaning
Energy Technology Data Exchange (ETDEWEB)
Rats were exposed to lead (Pb) before or after weaning. For preweaning exposures, nursing dams received 0.2% Pb acetate(1090 ppm Pb) in drinking water. Offspring treated after weaning consumed the same concentration. Tapwater served as the control fluid. Pre-post treatments were distributed among four experimental groups of 10 rats each: tap water-tap water, Pb-tap water, tap water-Pb, Pb-Pb. Operant behavior training began on Postnatal Day 58. Animals performed on a multiple reinforcement schedule of food presentation consisting of fixed-interval, fixed-ratio, and time out components.Statistical analyses of experimental sessions 4 to 11 (Postnatal Days 72 to 79) revealed that postweaning exposure significantly lengthened the median interval (interresponse time) between consecutive responses on both the interval and ratio schedules. Preweaning exposure alone tended to produce a shortening of the median interresponse time. Other performance ...
1982-01-01
Energy Technology Data Exchange (ETDEWEB)
This report documents the technical basis by which the workplace air monitoring and sampling program is operated in the 324 and 327 Buildings.
2000-01-17
Author: METCALFE, J.P., BALDWIN, D.J. and CRAYFORD, J.A. (2000). Summary: Project Report. ENVIRONMENT AGENCY. (Submitted).
Financing Projects That Use Clean Energy Technologies: An Overview of Barriers and Opportunities
Energy Technology Data Exchange (ETDEWEB)
Project finance is asset-based financing, meaning that the project lenders have recourse only to the underlying assets of a project. It involves both debt and equity, where the debt-to-equity ratio is typically large (e.g., 70% debt to 30% equity). Debt is used when available and when it is the least expensive form of financing, with equity still needed for credit worthiness. Most important, revenue from the project must be able to generate a return to the equity investors, and pay for interest and principal on the debt, transaction costs associated with developing and structuring the project, and operations and maintenance costs. Successful project financing must provide a structure to manage and share risks in an optimal way that benefits all participants, allocating risks to those entities that are able to mitigate each specific risk, and ...
2005-10-01
Gas Research Institute wetland research program
Energy Technology Data Exchange (ETDEWEB)
As part of three ongoing research projects, the Gas Research Institute (GRI) is studying the natural gas industry`s impacts on wetlands and how to manage operations so that impacts can be minimized or eliminated. The objective of the first project is to gain a better understanding of the causes and processes of wetland loss in the Louisiana deltaic plain and what role gas pipeline canals play in wetland loss. On the basis of information gathered from the first projects, management and mitigation implications for pipeline construction and maintenance will be evaluated. The objective of the second project is to assess the floral and faunal communities on existing rights-of-way (ROWs) that pass through numerous types of wetlands across the United States. The emphasis of the project is on pipelines that were installed within the past five years. The objective of the ...
1992-12-01
Light duty utility arm startup plan
Energy Technology Data Exchange (ETDEWEB)
This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).
1998-09-01
International Nuclear Information System (INIS)
It has been acknowledged that river morphology and hydrology have been intensively altered due to the anthropic demands in floodplain land use and management, flood protection, promotion of navigability or energy production. Rivers were transformed in water highways, having lost contact with their surrounding floodplain as well as the plethora of ecological processes and occupants once thriving in these ecotonal zones. The identification of this emerging threat of morphological and hydrological alteration on ecological integrity adds further complexity in the exploitation of hydrosystem resources. These resources are heavily coveted and guarded by different lobbies each having strategic views on future project development. Stakeholders may want to promote hydro-electricity, ecologists a natural reserve, communes may wish to have an increased flood protection and leisure promoters a nautical center. As a result, the proposition of a river development ...
2002-04-01
Management and organizational design: an initial look at a new project
International Nuclear Information System (INIS)
This project is designed to establish one basis for empirically linking aspects of management and organizational design to the safe operation of nuclear power plants. Current work is focusing on (a) reviewing existing literature relevant to this linkage, and (b) isolating and incorporating numerous safety relevant indicators. Later stages of this project will involve hypothesis development, data collection and analysis.
1983-01-01
Energy Technology Data Exchange (ETDEWEB)
The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2001 annual report covers the fifth year of sampling of this multi-year study. In 2001 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 45,907 hours of setline effort and 186 hours of hook-and-line effort was employed in 2001. A total of 390 white sturgeon were captured and tagged in the Snake River and 12 in the Salmon River. Since 1997, 36.1 percent of the ...
2003-03-01
Energy Technology Data Exchange (ETDEWEB)
The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2000 annual report covers the fourth year of sampling of this multi-year study. In 2000 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 53,277 hours of setline effort and 630 hours of hook-and-line effort was employed in 2000. A total of 538 white sturgeon were captured and tagged in the Snake River and 25 in the Salmon River. Since 1997, 32.8 percent of the ...
2003-03-01
Operational test report integrated system test (ventilation upgrade)
Energy Technology Data Exchange (ETDEWEB)
Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.
1999-10-05
In the present study, applications of the SPH method to industrial related issues are considered by starting from an existing open source 2D SPH code, namely the SPHYSICS code, which offers an effective ground for numerical developments, which are performed in order to bring an answer to industrial problems, such as simulations of solid/fluid coupling in a free surface flow context. The purpose of the present paper is therefore to expose the numerical developments which yield an enhanced version (referred to as "SPHYSIC2") of the initial code. Firstly, the different features added to obtain the operational code needed for engineering applications are described, and so are the problems raised on this way, offering a kind of review of SPH methods for engineers. Secondly, the validation of the proposed code is partially presented with two well known but difficult test cases, namely the classical "dam break" and "wedge entry" problems. Thirdly, ...
2010-01-01
An aerial radiological survey of the Hanford Site and surrounding area, Richland, Washington
International Nuclear Information System (INIS)
An aerial radiological survey was conducted over the Department of Energy's Hanford Site near Richland, Washington, during the period 5 July through 26 August 1988. The survey was expanded, and additional flights were conducted to the east of the site and along the banks of the Columbia River down to McNary Dam near Umatilla. The survey was flown at altitude of 61 meters (200 feet) by a helicopter containing 17 liters (eight 2 in. x 4 in. x 16 in.) of sodium iodide detectors. Gamma ray data were collected over the survey area by flying north-south lines spaced 122 meters (400 feet) apart. The processed data indicated that detected radioisotopes and their associated gamma ray exposure rates were generally consistent with those expected from normal background emitters and man-made fission/activation products resulting from activities at the site. External exposure rates were generally 10 microroentgens per hour (#mu#R/h) with some operating areas ...
1990-09-16
Alcohol from sugar beet. The Austrian sugar industry project
Energy Technology Data Exchange (ETDEWEB)
The Austrian sugar industry has developed a project for the manufacture of alcohol that is geared to the conditions in that country and is based on sugar beet as raw material. An alcohol production plant could be integrated in a sugar factory and operate all the year round at a capacity of 120,000 l/d. In this factory, the fermentation raw material would be in the form of green syrup (also thick juice if the need arose) and would be supplied from other sugar factories operating without molasses. The vinasse is to be concentrated and used or burnt. The project provides new possibilities for agriculture, and the sugar industry expects an improvement in plant utilization and a diversification.
1983-12-01
International Nuclear Information System (INIS)
A study was undertaken to determine experimentally the uptake of pollutants into of the different parts of the water hyacinth (Eichhornia crassipes) found in 'Jose Antonio Alzate' dam in the State of Mexico, Mexico. There is evidence for efficient and significant root accumulation of Ti, Mn, Fe, and Ba; but in the upper parts concentrations was consistently determined by the degree of watering. However, a significant input could be derived from a common generic source, such as the atmospheric deposition. The experimental study would, therefore, indicate that water hyacinth species can be highly effective in providing a control and treatment buffer for toxic discharges to the dam. (author)
1998-12-01
Seismic Stability Evaluation of Alben Barkley Lock and Dam ...
... similar to the S-wave tests except that exploding bridgewire detonators (EBW's) were used as the P-wave source. Crosshole ...
1989-03-01
British Library Electronic Table of Contents (United Kingdom)
SummaryA meshless numerical model is proposed to investigate shallow-water dam break flows in 1D open channels. The numerical model is to solve the shallow water equations (SWE) based on smoothed particle hydrodynamics (SPH). The concept of slice water particles (SWP) is adopted in the SPH-SWE formulation. The numerical sensitivity analysis is first performed to study the appropriate SWP number and variable smoothing length through dam break flows in an idealized 1D channel with dry/wet beds. Extensive validation by comparison with laboratory and field data is next conducted for four benchmark problems, including dam break flows through a rough flat channel, a rough bumpy channel with various downstream boundary conditions, a nonprismatic channel, and a realistic scale model of the Toce ri...
2011-01-01
In Situ Seismic Investigation of Folsom Dam and Reservoir ...
... An explosive charge (exploding bridgewire (EBW) detonator) was used for the crosshole P-wave tests. For the crosshole S-wave tests a ...
1989-09-01
Characteristics of transplacental lead transfer in rat dams and fetuses
International Nuclear Information System (INIS)
This study was designed to quantitate the dose resulting from lead exposure during the critical periods of brain development during gestation by determining: (1) if blood lead concentration in rat dams is affected by pregnancy status or duration of lead exposure, (2) if lead concentration in fetuses is associated with the duration of dam exposure, (3) the rates of lead absorption and elimination in pregnant and nonpregnant dams; and (4) the effect that prebreeding exposure on lead kinetics in the dam and upon fetus blood lead concentrations. The results of experiments in which the dams' drinking water contained 50 mg/L lead indicate blood lead levels (after normalizing by water consumption on a body weight basis) of pregnant rats are significantly higher than blood lead levels of non-pregnant rats. Statistical differences in blood lead levels were observed by day 15 of gestation and ...
Operation and maintenance experiences of pumped-storage plants
Energy Technology Data Exchange (ETDEWEB)
This report presents the results of a study on Operation and Maintenance (O M) practices in hydroelectric pumped storage plants. The objective of this project, which was sponsored by EPRI, is to record the practical knowledge on the O M of a number of the domestic and foreign pumped storage plants which has been accumulated by their operating staff. Civil, geotechnical, mechanical and electrical aspects of O M of the thirty-five plants visited are discussed, and some general conclusions, as warranted by the commonality of the problems, are drawn. These conclusions may be useful to the planners and designers of future pumped storage projects. In general, due to their layout, diversity and different modes of operation, the plants have few common problems which, in most cases, are limited to the mechanical and electrical aspects of the plants' operation. ...
1991-05-01
Technology evaluation report for the Buried Waste Robotics Program Subsurface Mapping Project
International Nuclear Information System (INIS)
This document presents a summary of the work performed in support of the Buried Waste Robotics Program Subsurface Mapping Project. The project objective was to demonstrate the feasibility of remotely characterizing buried waste sites. To fulfill this objective, a remotely-operated vehicle, equipped with several sensors, was deployed at the Idaho National Engineering Laboratory. Descriptions of the equipment and areas involved in the project are included in this report. Additionally, this document provides data that was obtained during characterization operations at the Cold Test Pit and the Subsurface Disposal Area, both at the Idaho National Engineering Laboratory's Radioactive Waste Management Complex, and at the Idaho Chemical Processing Plant. The knowledge gained from the experience, that can be applied to the next generation remote-characterization system, is extensive and is ...
Energy Technology Data Exchange (ETDEWEB)
Stability concerns of the Par Pond Dam, an embankment structure in the Savannah River Site complex, resulted in a comprehensive evaluation of the state of its integrity. Specifically, excessive seepage through the embankment, slope failure due to an earthquake event as well as liquefaction potential of the embankment and the foundation are addressed and the potential of failure is evaluated. Lastly, remedial benefits of the addition of a berm structure are also assessed.
1994-07-01
Dimensional metrology and positioning operations are used in many fields of particle accelerator projects. This lecture gives the basic tools to designers in the field of measure by analysing the spatial layout of measurement systems since it is central to dimensional metrology as well as positioning operations. In a second part, a case study dedicated to a synchrotron storage ring is proposed from the detection of the magnetic centre of quadrupoles to the orbit definition of the ring.
2010-01-01
The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is known as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive ...
2009-02-18
The thematic plant life assessment network (PLAN)
Energy Technology Data Exchange (ETDEWEB)
The Plant Life Assessment Network (PLAN) is a Brite Euram Type II Thematic Network, initiated by the European Commission to facilitate structured co-operation between all cost shared action projects already funded by the Commission which fall under this common technical theme. The projects involved address a multiplicity of problems associated with plant life assessment and are drawn from Brite-Euram, Standards, Measurement and Testing, Nuclear Fission Safety and Esprit EC programmes. The main aim of the Network is to initiate, maintain and monitor a fruitful co-operation process between completed, ongoing and future EC R and D projects, thereby promoting improved cross fertilization and enhanced industrial exploitation of R and D results. As the project is in its infancy, this presentation covers the background to the initiative in some detail. In particular ...
1998-12-31
Energy Technology Data Exchange (ETDEWEB)
This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed ...
2003-11-01
TABLE A: SPTR SITE SELECTION ANALYSIS LOCATION V ... - NASA
OPERATE AT SOUTH POLE WINTER AMBIENTS, GIVEN THE PROJECT'S BUDGET AND TIME LINES . ... 17 MAXIMUM ELECTRICAL LENGHT CONSTRAINED BY Ku-BAND AT 50 FT. ... A MAXIMUM LENGTH OF 50 FEET HAS BEEN SPECIFIED BY THE SYSTEM LINK CALCULATIONS TO ...
British Library Electronic Table of Contents (United Kingdom)
The main problems encountered during the operation of horizontal steam generators are considered. Design features of the new PGV-1000MK and PGV-1500 steam generators are analyzed.
2006-01-01
Chalk Point Cooling Tower Project: Chalk Point Meteorological Station Report. Volume II.
This report documents the operation, maintenance, calibration, data acquisition and data reduction at the Chalk Point Meteorological Station for the period November 15, 1978 through November 15, 1979. Climatological data summaries for each month and calib...
1979-01-01
Energy Technology Data Exchange (ETDEWEB)
Argonne National Laboratory (ANL) is implementing waste minimization and pollution prevention activities into its conduct of decontamination and decommissioning (D&D) projects. Many of these activities are rather straight forward and simple approaches, yet they are often overlooked and not implemented as often as they should or could be. Specific activities involving recycling and reuse of materials and structures, which have proven useful in lowering decommissioning and disposal costs on D&D projects at ANL are presented.
1996-07-01
Ghost properties of generalized theories of gravitation
Energy Technology Data Exchange (ETDEWEB)
We investigate theories of gravitation, in which spacetime is non-Riemannian and the metric g/sub munu/ is nonsymmetric, for ghosts and tachyons, using a spin-projection operator formalism. Ghosts are removed not by gauge invariance but by a Lagrange multiplier W/sub ..mu../, which occurs due to the breaking of projective invariance in the theory. Unified theories based on a Lagrangian containing a term lambdag/sup munu/g/sub / are proved to contain ghosts or tachyons.
1982-10-15
Guidebook on design, construction and operation of pilot plants for uranium ore processing
International Nuclear Information System (INIS)
The design, construction and operation of a pilot plant are often important stages in the development of a project for the production of uranium concentrates. Since building and operating a pilot plant is very costly and may not always be required, it is important that such a plant be built only after several prerequisites have been met. The main purpose of this guidebook is to discuss the objectives of a pilot plant and its proper role in the overall project. Given the wide range of conditions under which a pilot plant may be designed and operated, it is not possible to provide specific details. Instead, this book discusses the rationale for a pilot plant and provides guidelines with suggested solutions for a variety of problems that may be encountered. This guidebook is part of a series of Technical Reports on uranium ore processing being prepared by the IAEA's Division of Nuclear ...
Procyon 1. First prototype worldwide for storage spent nuclear fuel rods
International Nuclear Information System (INIS)
HFH Herbst has designed and built a unique machine for storage of spent highly radioactive nuclear fuel rods within two years for the Swedish SKB. The vehicle (total weight 98 t) can be operated underground without a driver. Herbst was able to bring to this project almost 30 years of experience in the complementation of vehicle projects for the nuclear industry. The Procyon 1 already proved its efficiency impressively in several hundred storage processes and operates with absolute reliability. (orig.)
2010-05-01
Installation, operation and economics of a biomass gasification system in Indonesia
Energy Technology Data Exchange (ETDEWEB)
Many rural industries generate amounts of biomass waste, such as rice husks, sawdust, wood chips, nutshells and plant stalks that represent a substantial energy resource. However, most often these biomass wastes are not utilized and are dumped or burned in the open. This paper will show the whole project cycle of an installation and commissioning of a thermal configuration of a BG-Systems in Indonesia. These projects highlight the economic, operational and environmental benefits of the BG-Systems. BG-Systems are small fixed-bed downdraft gasifier systems being marketed by BG Technologies that convert biomass into a producer gas that is essentially free of tars and can be used reliably in a diesel engine or thermal combustor. (author)
1999-07-01
Wind-To-Hydrogen Project: Operational Experience, Performance Testing, and Systems Integration
Energy Technology Data Exchange (ETDEWEB)
The Wind2H2 system is fully functional and continues to gather performance data. In this report, specifications of the Wind2H2 equipment (electrolyzers, compressor, hydrogen storage tanks, and the hydrogen fueled generator) are summarized. System operational experience and lessons learned are discussed. Valuable operational experience is shared through running, testing, daily operations, and troubleshooting the Wind2H2 system and equipment errors are being logged to help evaluate the reliability of the system.
2009-03-01
Gas Research Institute wetland research program
Energy Technology Data Exchange (ETDEWEB)
As part of three ongoing research projects, the Gas Research Institute (GRI) is studying the natural gas industry's impacts on wetlands and how to manage operations so that impacts can be minimized or eliminated. The objective of the first project is to gain a better understanding of the causes and processes of wetland loss in the Louisiana deltaic plain and what role gas pipeline canals play in wetland loss. On the basis of information gathered from the first projects, management and mitigation implications for pipeline construction and maintenance will be evaluated. The objective of the second project is to assess the floral and faunal communities on existing rights-of-way (ROWs) that pass through numerous types of wetlands across the United States. The emphasis of the project is on pipelines that were installed within the past five years. The ...
1992-01-01
Case report: Denys- Drash syndrome.
BACKGROUND: Denys-Drash Syndrome (DDS) is an uncommon disorder that appears sporadically and in rare cases may be inherited as an autosomal dominant trait It manifests either at birth or within the first year of life and typically consists of the triad of congenital nephropathy, Wilms tumour and intersex disorder. CASE REPORT: A 10 year-old Caucasian girl was referred to the Dental Department, at Glasgow Royal Hospital for Sick Children by her Paediatric Nephrologist Consultant. The patient was being teased by her peers over her markedly discoloured teeth. The dental history revealed that the patient was a regular dental attendee from an early age. She was dentally anxious having only experienced dental treatment under general anaesthesia (GA) when she was 4 years old. Apparently her primary dentition also showed a generalised discolouration. TREATMENT: This consisted of multiple visits for diet analysis and tooth brushing instruction with the use of disclosing tablets. Plaque control ...
2007-12-01
Future directions in controlling the LAMPF-PSR Accelerator Complex at Los Alamos National Laboratory
Energy Technology Data Exchange (ETDEWEB)
Four interrelated projects are underway whose purpose is to migrate the LAMPF-PSR Accelerator Complex control systems to a system with a common set of hardware and software components. Project goals address problems in performance, maintenance and growth potential. Front-end hardware, operator interface hardware and software, computer systems, network systems and data system software are being simultaneously upgraded as part of these efforts. The efforts are being coordinated to provide for a smooth and timely migration to a client-sever model-based data acquisition and control system. An increased use of the distributed intelligence at both the front-end and operator interface is a key element of the projects. 2 refs., 2 figs.
1991-01-01
The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.
1994-08-01
A 1-kW power demonstration from the advanced free electron laser
Energy Technology Data Exchange (ETDEWEB)
This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). The main objective of this project was to engineer and procure an electron beamline compatible with the operation of a 1-kW free-electron laser (FEL). Another major task is the physics design of the electron beam line from the end of the wiggler to the electron beam dump. This task is especially difficult because electron beam is expected to have 20 kW of average power and to simultaneously have a 25% energy spread. The project goals were accomplished. The high-power electron design was completed. All of the hardware necessary for high-power operation was designed and procured.
1997-08-01
1-MW(th) solar-thermal conversion full-system experiment
Progress made during the first phase effort of the Solar-Thermal Full-System Experiment is summarized. This is one of a number of projects in the Solar-Thermal Subprogram involved with the development of solar central receiver hardware and systems for future use by utilities. The main emphasis is on systems that use Brayton-Cycle (gas turbine) equipment. The project summarized involves the planning and design of a complete Brayton-Cycle solar central receiver experimental system that would include all components of a commercial-size electric utility solar power plant. The objective of the overall project is to demonstrate the technical feasibility of a complete Brayton-Cycle, solar-fossil hybrid central receiver system. Major objectives of the Phase I effort summarized are to plan and design the experiment in detail and to organize a utility Test and Operating Group that would be directly involved in ...
1982-08-01
Energy Technology Data Exchange (ETDEWEB)
The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This report presents a summary of results from the 1997-2002 Phase II data collection and represents the end of phase II. From 1997 to 2001 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon. A total of 1,785 white sturgeon were captured and tagged in the Snake River and 77 in the Salmon River. Since 1997, 25.8 percent of the tagged white sturgeon have been recaptured. Relative density of white sturgeon was highest in the free-flowing segment of the Snake River, with reduced densities of fish in Lower Granite Reservoir, and low densities the Salmon River. Differences were detected in the length ...
2004-02-01
The process for recovery of uranium from dam waste water
International Nuclear Information System (INIS)
For the treatment of dam waste water containing micro quantities of uranium, the so-called chemical precipitation method is conventionally used, that is, acidic sodium phosphate is added to it and so the uranium (UO_2"2"+) is removed in coprecipitation with the then occurring calcium phosphate (solid). The method, however, has several problems, such as the large space required and large quantities of sludge. For the pupose of eliminating such difficulties and removal and recovery of the uranium, development of the new uranium adsorption method was started. Of the many uranium adsorbents available, excellent ones were selected and then the continuous treatment test was made with small apparatus. Subsequently, the dam waste water uranium recovery facility was completed in 1983. (Mori, K.).
International Nuclear Information System (INIS)
KEPCO (Korean Electric Power Corp.) with the support of AECL and other Korean and Canadian subcontractors has created a strong multi-company team to execute design and construction of the Wolsung-2 CANDU 6 power plant. Key concepts of the project team are: 1. KEPCO is the project manager, and AECL is the major engineering and supply contractor; 2. Significant participation by Korean companies in design work in Canada and Korea; 3. Significant manufacturing in both Canada and Korea; 4. Construction by Korean contractors. Key concepts of the Wolsung 2 design are: 1. Evolutionary improvement of the Wolsung-1 plant which balances proven technology and necessary design improvements including current codes and standards. 2. Sharing some structures with the Wolsung-1 plant. This paper describes the successful establishment and operation of the complex project interfaces along with the current ...
1992-06-07
Energy Technology Data Exchange (ETDEWEB)
Work on the coke oven gas cleaning demonstration project (CCT-11) this quarter has focused on Phase IIB tasks, and include engineering, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. The project Milestone Schedule and Log is shown. Planned Baseline Supplemental Monitoring activities described in the Environmental Monitoring Plan were completed. Testing of the mechanical systems began in June, 1991. The cold commissioning date has been moved back from October 1, 1991 to November 1, 1991 to allow float for miscellaneous finish-up items beyond the electrical contractor`s projected completion date of October 31, 1991.
1995-05-01
Energy Technology Data Exchange (ETDEWEB)
Studies continued on organic tracers for use as hydrologic tracers as part of the Yucca Mountain Site Characterization project. This subject report for the quarter 01/01/93 through 03/31/93 discusses the following issues: project organization and responsibilities; quality assurance program; design control; procurement document control; instructions, procedures, and drawings; document control; control of purchased items and services; identification and control of items; control of processes; inspection; test control; control of measuring and test equipment; handling, storage, and shipping; inspection, test, and operating status; control of nonconforming items and conditions; corrective action; quality assurance records; audits; software quality assurance; and scientific investigation.
1993-02-25
High-level waste canister storage final design, installation, and testing. Topical report
Energy Technology Data Exchange (ETDEWEB)
This report is a description of the West Valley Demonstration Project`s radioactive waste storage facility, the Chemical Process Cell (CPC). This facility is currently being used to temporarily store vitrified waste in stainless steel canisters. These canisters are stacked two-high in a seismically designed rack system within the cell. Approximately 300 canisters will be produced during the Project`s vitrification campaign which began in June 1996. Following the completion of waste vitrification and solidification, these canisters will be transferred via rail or truck to a federal repository (when available) for permanent storage. All operations in the CPC are conducted remotely using various handling systems and equipment. Areas adjacent to or surrounding the cell provide capabilities for viewing, ventilation, and equipment/component access.
1998-04-01
Energy Technology Data Exchange (ETDEWEB)
Work on this coke oven gas cleaning demonstration project (CCT-II) this quarter has been focused on Phase IIB tasks, and include engineering, procurement, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. Engineering efforts are nearly complete. Remaining to be finalized is an assessment of electrical heat tracing/insulation needs for pipe lines, assessment of fire protection requirements, and instrument modifications. Procurement of all major equipment items is complete, except for possible additions to fire fighting capabilities. Major focus is on expediting pipe and structural steel to the project site. Civil construction is complete except for minor pads and bases as required for pipe supports, etc. Erection of the hydrogen sulfide and ammonia scrubber vessels is complete. Installation of ...
1993-10-22
Energy Technology Data Exchange (ETDEWEB)
This is the eighth part of a ten-part final report for the Swiss Federal Office of Energy (SFOE) on a project that looked into potential problems relating to the Swiss electricity distribution grid with respect to the increasing number of distributed power generation facilities being put into service. The identification of special conditions for the grid's operation and future development that take increasing decentralised power production into account are discussed. The results of the project activities encompass the analysis and evaluation of various problem areas associated with planning and management of the grid during normal operation and periods of malfunction, as well as required modifications to safety systems and grid configurations. This seventh appendix to the main report summarises and discusses the knowledge gained during the project and attempts to provide ...
2003-07-01
This report contains a summary of monthly dustfall, SO2, rainfall, crops and soils information obtained over the period May, 1976 to March, 1977 from 12 monitoring sites near the Chalk Point Generating Station operated by PEPCO which is located 65 km sout...
1977-01-01
A promising 2 GW turboset for nuclear power plants
International Nuclear Information System (INIS)
In co-operation with the Scientific Planning Department of the Central Research Institute for Vessel- and Turbine Building the construction office of the turbine factory Charkow finished the draft of a slowly running (n = 1500 min"-"1) 2 GW-turboset for the operation of nuclear power plants. The chief purpose of the project was to determine the technical problems that are used to occur during the development of such steam turbines, as well as to settle the most favourable design. (orig./GL).
Status of FFTF startup program and future FFTF utilization
International Nuclear Information System (INIS)
A brief FFTF project description is provided which includes general plant siting information, general layout, plant design parameters, description of principal systems and components, and description of support facilities. The current status of the FFTF project is provided, including status of plant construction, overall status of the plant checkout and test program, status of operating authorization and plant operating procedures and personnel, and status of reactor core components and experiments. Specific information on the acceptance test program and early program results is discussed. The role of FFTF in the future breeder program is described, including its objectives for verification of plant system and components designs and operability and use as an irradiation test facility.
1978-10-25
Institutt for Energiteknikk - Annual Report 1994
Energy Technology Data Exchange (ETDEWEB)
Work at Institutt for energiteknikk (IFE) comprises both nuclear and non-nuclear activities. The main nuclear program is centered on the Halden Reactor Project. In 1958, the first Halden Reactor Project Agreement was signed by organisations representing 12 European countries. During 1994 France became a full member and associate membership was established with Russia. Accordingly, 16 countries were participating in the Project by the end of the year. The objectives have evolved from being simply a demonstration of the operation of a boiling heavy-water reactor to becoming a substantial research and development programme covering the domains of human-machine interaction, fuel behaviour, materials testing, water chemistry, and instrumentation. In 1994, significant progress was achieved in all of the areas addressed by the project, including the re-instrumentation of irradiated fuel ...
1995-12-01
Energy Technology Data Exchange (ETDEWEB)
The purpose of this solar energy project was to design, manufacture, install, maintain and evaluate solar heating systems in order to stimulate community acceptance of the practicality of solar applications, reduce non-renewable energy resource consumption, and decrease residential expenditures for energy. The project also provided skill training and experience for CETA employees in the design, manufacture, and installation of solar energy equipment systems. CDC's contract had four separate solar energy projects; namely: Domestic Water Heating Systems for four Single-Family Homes; Domestic Water Heating for an industrial building; Domestic Water Heating for a (4) unit apartment complex (includes (12) supplemental space heating units); and Integral Passive Water Heaters and Energy Conservation Devices for (8) one bedroom homes. CDC staff designed all solar systems and CETA trainees (County and City vocational ...
1983-10-19
Relation of the One-Phase Stefan Problem to the Seepage of Liquids and Electrochemical Machining.
The flow of water through a dam of fairly arbitrary shape is examined in the limit of large frictional drag on the flow. The relation of the problem to the one-phase Stefan problem and a problem of anodic smoothing is explored. Monotonicity and uniqueness...
1979-01-01
UK PubMed Central (United Kingdom)
Antibodies against feline leukemia virus (FeLV) and the feline oncornavirus-associated cell membrane antigen (FOCMA) were transferred from pregnant cats to their suckling kittens. All of these kittens...Full Text Available
1977-04-01
Maternal Overweight Programs Insulin and Adiponectin Signaling in the Offspring
UK PubMed Central (United Kingdom)
Gestational exposure to maternal overweight (OW) influences the risk of obesity in adult life. Male offspring from OW dams gain greater body weight and fat mass and develop insulin resistance when fed...Full Text Available
2010-06-01
Bathymetry and temperature of some glacial lakes in Wyoming
UK PubMed Central (United Kingdom)
On the west flank of the Wind River Mountains, Wyoming, are several large lakes occupying glacially scoured depressions dammed by terminal moraines. Fremont, Willow, and New Fork Lakes, having maximal...Full Text Available
1980-04-01
Anthropogenic enhancement of Egypt's Mediterranean fishery
UK PubMed Central (United Kingdom)
The highly productive coastal Mediterranean fishery off the Nile River delta collapsed after the completion of the Aswan High Dam in 1965. But the fishery has been recovering dramatically since the...Full Text Available
2009-02-03
Energy Technology Data Exchange (ETDEWEB)
Failure of a dam is something we hope never happens. But if a failure occurs, it`s important to study the circumstances in order to expand our knowledge base, and then apply what we learn to other structures.
1992-03-01
Technical data analysis program. Final report. [Fort Lewis and P-99; data consolidation
Separate comprehensive final reports on the status of the SRC-II Demonstration Plant Design and on operating experiences at the Ft. Lewis and P-99 SRC pilot plants were prepared after the termination of those projects. However, time constraints made it impossible to consolidate all of the pilot plant data and operating experiences and relate these to the Demonstration Plant or future plant design. Most of the experimental programs during the later stages of pilot plant operation were in direct support of specific technical uncertainties identified in design work. The results of these programs would have been of substantial use in verifying or modifying design philosophy had the project proceeded. This technical data analysis project was undertaken to consolidate the pilot plant results presented in numerous reports under DOE Contract DE-AC01-79ET10104 for ...
1984-11-01
Energy Technology Data Exchange (ETDEWEB)
Passage through dams is a major source of mortality of anadromous juvenile salmonids because some populations must negotiate up to eight dams in Columbia and Snake rivers. Dams cause direct mortality when fish pass through turbines, but dams may also cause indirect mortality by altering migration conditions in rivers. Forebays immediately upstream of dams have decreased the water velocity of rivers and may contribute substantially to the total migration delay of juvenile salmonids. Recently, Coutant (2001a) suggested that in addition to low water velocities, lack of natural turbulence may contribute to migration delay by causing fish to lose directional cues. Coutant (2001a) further hypothesized that restoring turbulence in dam forebays may reduce migration delay by providing directional cues that allow fish to find passage routes more quickly (Coutant 2001a). ...
2005-07-01
Energy Technology Data Exchange (ETDEWEB)
This report contains the operation procedures in extreme situations and lessons learned from blackouts, based on a mandate given by the Operations Committee. Nordic TSOs have had common rules and principles for system operation i.e. System Operation Agreement since the late 1990s. The rules have been revised according to the system security and market changes and needs. The collaboration between system operators is regular and fruitful. The knowledge and capability to manage extreme situations of the Nordic power system has continuously increased and the recent blackouts did not show major deficiencies in operation practices. Regardless of the existing good collaboration it is important to continue development in the future in order to ensure high system security. Important development areas are security of reserve supervision and coordination of calculation ...
2004-12-01
Los Alamos DP West Plutonium Facility decontamination project
Energy Technology Data Exchange (ETDEWEB)
The DP West Plutonium Facility operated by the Los Alamos National Laboratory, Los Alamos, New Mexico, was decontaminated between April 1978 and April 1981. The facility was constructed in 1944 to 1945 to produce plutonium metal and fabricate parts for nuclear weapons. It was continually used as a plutonium processing and research facility until mid-1978. Decontamination operations included dismantling and removing gloveboxes and conveyor tunnels; removing process systems, utilities, and exhaust ducts; and decontaminating all remaining surfaces. This report describes glovebox and conveyor tunnel separations, decontamination techniques, health and safety considerations, waste management procedures, and costs of the operation.
1982-01-01
Algorithmic tangent stiffness in elastoplasticity and elastoviscoplasticity: A geometric insight
British Library Electronic Table of Contents (United Kingdom)
The algorithmic, or consistent, tangent stiffness was introduced to improve the asymptotic convergence rate of the iterative correction algorithm for the evolutive analysis of elastoplastic structures. The original approach is based on a formulation of the elastoplastic law in terms of a plastic multiplier with an analysis which, in general, requires an operator inversion. A geometric description of the method, based on hypersurface theory, is proposed here to provide a clear picture of the algorithmic properties. An estimate of the tangent stiffness associated with finite step elastoplastic and elastoviscoplastic constitutive models is given. It is based on the properties of the projection operator on the elastic domain and avoids operator inversions retaining the beneficial properties of...
2010-01-01
Energy Technology Data Exchange (ETDEWEB)
The Jansen pumped-storage plants owned by Bayernwerk Wasserkraft AG are located on the river Pfreimd in eastern Bavaria, Germany. The group comprises the three power plants at Reisach, Tanzmuehle and Trausnitz, as well as the Rabenleite upper reservoir and two weirs. After forty years of service, the power plant group has recently been rehabilitated. The rehabilitation and modernization scheme included, inter alia, replacing the surface sealing on the upstream side of the upper reservoir dam, installing a state-of-the-art leakage and stability monitoring system, and renewing the instrumentation and control equipment in the power plants and in the central control room. Finally, the paper describes the operating experience with the new I and C systems. (orig.) [German] Die Pumpspeicherkraftwerke Jansen der Bayernwerk Wasserkraft AG befinden sich an der Pfreimd in Ostbayern. Die Kraftwerksgruppe besteht aus den 3 Kraftwerken Reisach, Tanzmuehle ...
1999-11-01
Innovative coke oven gas cleaning system for retrofit applications. Volume 1, Public design report
Energy Technology Data Exchange (ETDEWEB)
This Public Design Report provides, in a single document, available nonproprietary design -information for the ``Innovative Coke Oven Gas Cleaning System for Retrofit Applications`` Demonstration Project at Bethlehem Steel Corporation`s Sparrows Point, Maryland coke oven by-product facilities. This project demonstrates, for the first time in the United States, the feasibility of integrating four commercially available technologies (processes) for cleaning coke oven gas. The four technologies are: Secondary Gas Cooling, Hydrogen Sulfide and Ammonia Removal, Hydrogen Sulfide and Ammonia Recovery, and Ammonia Destruction and Sulfur Recovery. In addition to the design aspects, the history of the project and the role of the US Department of,Energy are briefly discussed. Actual plant capital and projected operating costs are also presented. An overview of the integration (retrofit) of the ...
1994-05-24
Dilute chemical cleaning of PWR steam generators off-line cleaning process evaluation
Energy Technology Data Exchange (ETDEWEB)
This project evaluated the feasibility of using a low-concentration (approx. 0.5 wt %) chemical cleaning process to remove corrosion product deposits from steam generator surfaces and magnetite from tube-to-support plate crevices of PWR steam generators. The primary objective was to develop a dilute process that could be safely applied at scheduled intervals, such as during normal refueling outages, to maintain a clean operating condition in the steam generator. The dilute chemical cleaning process developed in this project was demonstrated successfully on two model generators which were operated on faulted chemistry by DOE/CRC at Commonwealth's State Line Facility. Unit 5 was cleaned after 48 days of operation with 1% seawater fouling, and Unit 6 was cleaned after 112 days of operations with Lake Michigan water. This report describes work leading to ...
1983-07-01
Dilute chemical cleaning of PWR steam generators off-line cleaning process evaluation
International Nuclear Information System (INIS)
This project evaluated the feasibility of using a low-concentration (approx. 0.5 wt %) chemical cleaning process to remove corrosion product deposits from steam generator surfaces and magnetite from tube-to-support plate crevices of PWR steam generators. The primary objective was to develop a dilute process that could be safely applied at scheduled intervals, such as during normal refueling outages, to maintain a clean operating condition in the steam generator. The dilute chemical cleaning process developed in this project was demonstrated successfully on two model generators which were operated on faulted chemistry by DOE/CRC at Commonwealth's State Line Facility. Unit 5 was cleaned after 48 days of operation with 1% seawater fouling, and Unit 6 was cleaned after 112 days of operations with Lake Michigan water. This report describes work leading to the model ...
Using condition monitoring for maintenance, control of hydro plants
Energy Technology Data Exchange (ETDEWEB)
Electric utilities are actively seeking ways of optimizing the economics of their operations by improving productivity and reducing time and money spent on maintenance. Iberdrola, a Spanish utility, is using advanced machine condition-monitoring technology to centralize control and maintenance of its hydropower projects as a means of achieving those goals. The company is using a blend of technologies to supervise their projects from a regional control center. The monitoring scheme makes use of data from on-line, machine-condition monitors, displays from in-plant audio asnd video equipment, and analysis from the control center`s SCADA system.
1994-12-31
LUCIFER, a potentially background-free approach to the search for neutrinoless double beta decay
British Library Electronic Table of Contents (United Kingdom)
LUCIFER (Low-background Underground Cryogenic Installation For Elusive Rates) is a new project for the study of neutrinoless Double Beta Decay, based on the technology of scintillating bolometers. These devices promise a very efficient rejection of the alpha background, opening the way to a virtual background-free experiment if candidates with a transition energy higher than 2615 keV are investigated. The baseline candidate for LUCIFER is 82Se. This isotope will be embedded in ZnSe crystals grown with enriched selenium and operated as scintillating bolometers in a low-radioactivity underground dilution refrigerator. In this paper, the LUCIFER concept will be introduced. The sensitivity and the very promising prospects related to this project will be discussed.
2011-01-01
Energy Technology Data Exchange (ETDEWEB)
The purposed project is a commercial-scale ethanol-fuel facility with a capacity of twenty million gallons per year of fuel-grade ethanol. In addition, 70,000 tons per year of distillers dried grains will be produced. The following tasks and issues are addressed: process engineering - process descriptions, plant layout, and design; economics and finance - overview of capital and operating costs; environmental analysis - preliminary project description; and permit processing and legal issues. (MHR)
1981-08-01
Gauge equivalence of representations of symmetry groups in quantum mechanics
International Nuclear Information System (INIS)
The equivalence of representations of symmetry groups operating upon wave-functions in configuration space is studied with regard to the (intuitive) notion of physical equivalence. A refinement of the usual projective equivalence relation is introduced, called gauge equivalence, for which the allowed unitary equivalence transformations are gauge transformations. For a Euclidean as well as for Newton-Hooke symmetry group the gauge equivalence classes of unitary multiplier representations are determined. These examples support the assertion that equivalence from a physical viewpoint corresponds better to this new gauge equivalence concept than to the usual notion of projective equivalence. (author).
Energy Technology Data Exchange (ETDEWEB)
This work develops and demonstrates a laboratory-scale high temperature natural gas furnace that can operate with/without oxygen enrichment to significantly improve energy efficiency and reduce emissions. The laboratory-scale is 5ft in diameter & 8ft tall. This furnace was constructed and tested. This report demonstrates the efficiency and pollutant prevention capabilities of this test furnace. The project also developed optical detection technology to control the furnace output.
2007-02-16
Energy Technology Data Exchange (ETDEWEB)
The purpose of this project is to integrate a variety of geographic information systems capabilities and telecommunication technologies for potential use in geographic network and visualization applications. The specific technical goals of the project were to design, develop, and simulate the components of an audio/visual geographic communications system to aid future real-time monitoring, mapping and managing of transport vehicles. The system components of this feasibility study are collectively referred to as a Geographic Visualization and Communications System (GVCS). State-of-the-art techniques will be used and developed to allow both the vehicle operator and network manager to monitor the location and surrounding environment of a transport vehicle during shipment.
1998-03-30
Combustion performance of Coal Valley coal in a pilot-scale utility boiler. Report No. ERL 87-18(CF)
Energy Technology Data Exchange (ETDEWEB)
Combustion performance trials were conducted on a commercial sample of Coal Valley coal from the Coalspur coalfield in the foothills region of Alberta. The project included an analytical investigation of the coal and coal ash properties as well as combustion studies in the CCRL pilot-scale, pulverized coal-fired boiler, under conditions representative of those in large steam boilers. This report gives the objectives of the project, the analyses of the coals, and describes the facilities and operational procedures. An evaluation of the experimental results and the conclusions are presented.
1987-01-01
A compilation of reports of the Advisory Committee on reactor safeguards. 1996 Annual report
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 47 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1996. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room, the U.S. Library of Congress, and the Internet at http://www.nrc.gov/ACRSACNW. The reports are divided into two groups: Part 1 contains ACRS reports by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
1997-04-01
Status of the surry low power and shutdown PRA
International Nuclear Information System (INIS)
Traditionally, probabilistic risk analyses [PRA] of severe accidents in nuclear power plants have limited themselves to consideration of the set of initiating events occurring during full power operation. However, some analyses of accident initiators during low power, shutdown, and other modes of plant operation other than full power have been performed. These studies as well as the Chernobyl accident and recent operating experience at U.S. pressurized water reactors suggested that risks during low power and shutdown could be significant. As such, the analysis of the frequencies, consequences, and risks of these accidents was identified as one task in the Nuclear Regulatory Commission staff's study of the implications of the Chernobyl accident to U.S. commercial nuclear power plants. The surry PRA project is an ongoing high priority effort at BNL [Brookhaven National Laboratory] that is expected to ...
1990-10-01
Energy Technology Data Exchange (ETDEWEB)
This paper describes EPRI`s computer based Performance, Operation and Maintenance Management System (``POMMS``) consisting of four (4) modules (``Modules``). These Modules are used to monitor, evaluate and analyze the cost effective operation of simple cycle and combined cycle gas turbine power plants. Inputs to POMMS relating to plant performance, availability and maintenance are monitored, stored in a data acquisition system and analyzed to determine their impact on performance and cost parameters. POMMS was developed by EPRI, Project Manager Fluor Daniel Power Generation Company and by the subcontractors who, together, engineered the individual POMMS Modules while working on EPRI`s Durability Surveillance of Advanced Gas Turbines Project (``Project``). The following modules are described in this paper and may be applied together or individually: Rotating Blade Temperature ...
1994-12-31
The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan
Energy Technology Data Exchange (ETDEWEB)
Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the ...
2009-04-29
Physical aspects of quality assurance in radiotherapy: A protocol for quality control
International Nuclear Information System (INIS)
In consistency with the increasing requests from Member States for establishing radiotherapy programmes, an IAEA Technical Co-operation project was initiated in Latin America aimed at improving the physical aspects (as a complement to the clinical issues) of quality assurance in radiotherapy; this ARCAL XXX project (RLA/6/032) was classified as a Model Project of the IAEA. Among the important outcomes of the project were (i) the training of a considerable number of medical physicists in hospitals of the region, (ii) the development of a protocol for quality control procedures, and (iii) the organization of quality audit site visits (to the participant countries) where the implementation in hospitals of the developed quality control procedures is verified. The present publication is the protocol for quality control of the physical aspects of radiotherapy. It contains detailed ...
2009-06-21
Energy Technology Data Exchange (ETDEWEB)
Test Area North (TAN) was a site of the Aircraft Nuclear Propulsion (ANP) Project of the U.S. Air Force and the Atomic Energy Commission. Its Cold War mission was to develop a turbojet bomber propelled by nuclear power. The project was part of an arms race. Test activities took place in five areas at TAN. The Assembly & Maintenance area was a shop and hot cell complex. Nuclear tests ran at the Initial Engine Test area. Low-power test reactors operated at a third cluster. The fourth area was for Administration. A Flight Engine Test facility (hangar) was built to house the anticipated nuclear-powered aircraft. Experiments between 1955-1961 proved that a nuclear reactor could power a jet engine, but President John F. Kennedy canceled the project in March 1961. ANP facilities were adapted for new reactor projects, the most important of which were Loss of Fluid Tests (LOFT), part of ...
2005-02-01
Energy Technology Data Exchange (ETDEWEB)
Floating Production, Storage and Offloading (FPSO) systems have become a popular choice in recent years for marginal, fast-track or deepwater field developments world wide. However, the majority of these developments have incurred significant project delays and budget overruns as a result of commercial structure, project management and design/operating problems. The Health and Safety Executive (HSE) commissioned IGL Engineering Ltd to perform a study to highlight specific areas where safety concerns have arisen. The study also aims to identity the fundamental causes of problems and identify key lessons to be learned from such projects which can be used to the benefit of future developments. In summary, there are five fundamental areas where weaknesses can and have lead to the problems experienced in FPSO developments. The areas are all interrelated and many problems stem from deficiencies in more than ...
2000-07-01
Environmental Restoration Project quality system requirements for the Hanford Site. Revision 3
International Nuclear Information System (INIS)
This document defines the quality system requirements for the US Department of Energy, Richland Operations Office (DOE-RL), Environmental Restoration (ER) Project at the Hanford Site. The Environmental Restoration Project Quality System Requirements for the Hanford Site integrates quality assurance requirements from the DOE Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), the Hanford Facility Resource Conservation and Recovery Act of 1976 (RCRA) Permit, and applicable Federal and Washington State regulations. This document, based on ten criteria, provides user organizations with the flexibility to incorporate only those criteria and paragraphs applicable to their specific scopes of work. The requirements of this document are to be applied based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and ...
Clear liquor scrubbing with anhydrite production. Fourth quarter 1996 technical progress report
Energy Technology Data Exchange (ETDEWEB)
This project is part of PETC`s Advanced Power Systems Program, whose mission is to accelerate the commercialization of affordable, high- efficiency, low emission, coal-fueled electric generating technologies. A process concept - Clear Liquor Scrubbing with Anhydrite Production - was proposed and accepted by PETC as a Phase I project in its Mega-PRDA program. the project integrated three process operations - chloride control upstream of the flue gas desulfurization (FGD) system, a clear liquor process for enhanced SO{sub 2} removal performance, and production of anhydrite (anhydrous calcium sulfate) rather than calcium sulfite or gypsum (calcium sulfate dihydrate). The first step in the project was to perform batch and flow-through experiments in the laboratory to confirm theoretical calculations and preliminary laboratory results concerning anhydrite formation, these laboratory ...
1997-02-03
The surprising role of risk in utility integrated resource planning
Energy Technology Data Exchange (ETDEWEB)
Integrated resource planning is rapidly emerging as the preferred planning process for electric utilities. Under IRP, planners project the initial and annual operating costs of different resource options and compare them using the revenue-requirements method (RRM)- a project-evaluation technique that discounts future costs (i.e., revenue requirements) into present values. The discount rate used for these computations is usually the firm's weighted-average cost of capital (WACC)-the weighted-average cost of the firm's equity and debt. The project alternative with the lowest present-value revenue requirement (PVRR) (i.e., lowest costs) emerges as the economic choice.
1993-04-01
Assessment of cost savings of DOE's return-on-investment program
Energy Technology Data Exchange (ETDEWEB)
The U.S. Department of Energy (DOE) Office of Pollution Prevention (EM-77) created is successful internally competed program to fund innovative projects based on projected returns. This is called the Return-on-Investment (ROI) program. EM-77 conducted a successful ROI pilot, developed and implemented sound management practices, and successfully transferred the program to several Operations Offices. Over the past 4 years sites have completed 262 ROI projects (costing $18.8 million) with claimed first-year savings of $88 million and claimed life cycle savings exceeding $300 million. EM-77 requested that Oak Ridge National Laboratory perform an independent evaluation of the site-led, DOE-HQ-funded pollution prevention (P2) ROI program to assist the Department in determining whether claimed savings are real.
1999-08-01
A compilation of reports of the Advisory Committee on Reactor Safeguards: 1995 annual. Volume 17
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 44 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1995. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
1996-04-01
A compilation of reports of the Advisory Committee on Reactor Safeguards: 1992 Annual. Volume 14
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 50 ACRS reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1992. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part I contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
1993-04-01
A compilation of reports of the Advisory Committee on Reactor Safeguards: 1992 Annual
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 50 ACRS reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1992. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part I contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
1993-04-01
A compilation of reports of the Advisory Committee on Reactor Safeguards: 1991 annual. Volume 13
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 41 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1991. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
1992-04-01
A compilation of reports of the Advisory Committee on Reactor Safeguards: 1991 annual
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 41 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1991. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
1992-04-01
A compilation of reports of the Advisory Committee on Reactor Safeguards: 1989 annual
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 54 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1989. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1 -- ACRS Reports on Project Reviews, and Part 2 -- ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order.
1990-04-01
A compilation of reports of the Advisory Committee on Reactor Safeguards: 1988 annual
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 47 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1988. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1, ACRS Reports on Project Reviews, and Part 2, ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. 136 refs., 1 tab.
1989-04-01
A compilation of reports of the Advisory Committee on Reactor Safeguards: 1987 annual
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 47 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1987. It also includes a report to the Congress on the NRC Safety Research Program for FY 1988. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order.
1988-04-01
A compilation of reports of the Advisory Committee on Reactor Safeguards, 1990 annual
Energy Technology Data Exchange (ETDEWEB)
This compilation contains 31 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission or to the Executive Director for Operations during calendar year 1990. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subject. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
1991-04-01
Energy Technology Data Exchange (ETDEWEB)
This paper details the development of a decontamination approach for the West Valley Demonstration Project (WVDP), Decontamination Project Plan (Plan). The WVDP is operated by West Valley Nuclear Services Company (WVNSCO), a subsidiary of Westinghouse Government and Environmental Services, and its parent companies Washington Group International and British Nuclear Fuels Limited (BNFL). The WVDP is a waste management effort being conducted by the United States Department of Energy (DOE) at the site of the only commercial nuclear fuel reprocessing facility to have operated in the United States. This facility is part of the Western New York Nuclear Service Center (WNYNSC), which is owned by the New York State Energy Research and Development Authority (NYSERDA). As authorized by Congress in 1980 through the West Valley Demonstration Project Act (WVDP Act, Public Law 96-368), the ...
2002-02-25
Gas Storage Technology Consortium
Energy Technology Data Exchange (ETDEWEB)
The EMS Energy Institute at The Pennsylvania State University (Penn State) has managed the Gas Storage Technology Consortium (GSTC) since its inception in 2003. The GSTC infrastructure provided a means to accomplish industry-driven research and development designed to enhance the operational flexibility and deliverability of the nation's gas storage system, and provide a cost-effective, safe, and reliable supply of natural gas to meet domestic demand. The GSTC received base funding from the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) Oil & Natural Gas Supply Program. The GSTC base funds were highly leveraged with industry funding for individual projects. Since its inception, the GSTC has engaged 67 members. The GSTC membership base was diverse, coming from 19 states, the District of Columbia, and Canada. The membership was comprised of natural gas storage field ...
2010-09-30
International Nuclear Information System (INIS)
Japan's basic nuclear policy is to reprocess spent fuel and to effectively use the recovered plutonium and uranium. MOX fuel utilization in LWRs is promoted in 16-18 reactors by FY2015. Commercial operation of Rokkasho Reprocessing Plant is planned to start in 2012. Prototype reactor 'Monju' restarted operation in May 2010. From FY 2007, Fast Reactor Cycle Technology Development Project (FaCT project) started which focuses more toward the commercialization stage FBR cycle. Basic scenario of Japan's R and D aims for realization of demonstration FBR by around 2025 and introducing commercial FBRs before 2050. Smooth transition from LWR fuel cycle to FBR one is an important point. For nuclear fuel cycle which requires long term R and D, human resources development and keeping is vitally important. (author)
2010-10-01
CWTC business plan; Wind turbine component centre
Energy Technology Data Exchange (ETDEWEB)
This report presents the Business Plan for the establishment of the Wind Turbine Component Centre (CWTC) to meet the objectives of performing theoretical research and experimental testing. The core idea of a CWTC is to support the Danish wind energy industry and research activities at the component level improving the competitive advantage of that industry. The CWTC will in itself operate its activities, including access to test and experimental facilities, on a semi commercial basis. The business model for the CWTC presented is based on revenues coming from component manufacturers as well as research grants, and will include membership fees as well as hourly payment and larger projects where payment is a limited project sum. The presented roadmap model clarifies the development path towards a fully developed CWTC, which will cover test of all important components along the drive-train as well as offering a comprehensive ...
2011-04-15
Energy Technology Data Exchange (ETDEWEB)
In supervising CANDU plant operation, Operations staff must routinely monitor plant status using information from several information systems. One key source of plant status information are the CRT displays at console workstations and panel locations. At Darlington, as at most CANDU plants, Operations staff have adopted a reference set of displays for use in monitoring during Full Power Steady State conditions. The display set employed was chosen from the available suite of displays, and operational experience has demonstrated that the current displays could be improved. For Outages, no reference display set has been defined, and for Upset conditions, the current Transient display set does not provide the information needed by operations staff, and consequently is not used. This paper describes the basis for and findings from a COG project [1] undertaken in 1997 ...
1999-07-01
Nuclear power plant support activities in reactors chemistry at CNEA
International Nuclear Information System (INIS)
Argentina has two operating PHWR nuclear power plants. Atucha I NPP is a pressure vessel type heavy water reactor of 360 MW e with 25 years of operation and Embalse NPP is a pressure tube type CANDU-600 reactor of 640 MW e. Atucha II, a third plant of 600 MW e of the pressure vessel type similar to Atucha I, is being constructed. NASA (Nucleoelectrica Argentina S.A.) currently operates both nuclear power plants. The National Atomic Energy Commission (Comision Nacional de Energia Atomica - CNEA) provides operational support to the plants, including research and development assistance, and actual technical services and maintenance work in different areas. The Chemistry Department, formerly the Reactor Chemistry Department has carried out project and support activities to the plants during the past 20 years. The aim of this work is to describe the present organization and the ...
1999-10-15
Yucca Mountain Task 4, Final report FY 1993
Energy Technology Data Exchange (ETDEWEB)
Four major projects at UNRSL have been supported by NWPO-Neotectonics Yucca Mountain Task 4 funds during the last year: (1) Operation and analysis of data from the UNRSL microearthquake network at Yucca Mountain. (2) Continued operation, maintenance, and calibration of three broadband stations. Limited data analysis was also initiated. (3) Continued review by Dr. Brune of documents and literature related to seismic hazard and tectonics of the Yucca Mountain region. (4) Testing of noise levels in boreholes.
1993-09-30
Energy Technology Data Exchange (ETDEWEB)
The chemical operational concept originally established for the water-steam circuit of Angra II nuclear power plant has undergone several modifications throughout the development of the project. This work discusses the two main modifications giving special attention to the costs involved and analyses the main points and the consequences of such modifications 1 ref., 4 figs., 2 tabs.
1995-12-31
United States Department of Energy breeder reactor staff training domestic program
Energy Technology Data Exchange (ETDEWEB)
Two US DOE projects in the Pacific Northwest offer unique on-the-scene training opportunities at sodium-cooled fast-reactor plants: the Fast Flux Test Facility (FFTF) near Richland, Washington, which has operated successfully in a wide range of irradiation test programs since 1980; and the Experimental Breeder Reactor II (EBR-II) near Idaho Falls, Idaho, which has been in operation for approximately 20 years. Training programs have been especially designed to take advantage of this plant experience. Available courses are described.
1984-01-01
Energy Technology Data Exchange (ETDEWEB)
This study investigates spent fuel cask handling experience at existing nuclear facilities to determine appropriate cask decontamination and maintenance operations at the potential Yucca Mountain repository. These operations are categorized as either routine or nonroutine. Routine cask decontamination and maintenance tasks are performed in the cask preparation area at the repository. Casks are taken offline to a separate cask maintenance area for major nonroutine tasks. The study develops conceptual designs of the cask preparation area and cask maintenance area. The functions, layouts, and major features of these areas are also described.
1992-04-01
Energy Technology Data Exchange (ETDEWEB)
This paper describes the design, operation, and performance of an HVAC system installed as part of a project to demonstrate energy efficiency and environmental responsibility in commercial buildings. The systems installed in the 2180 m{sup 2} office building provide superior air quality and thermal comfort while requiring only half the electrical energy of conventional systems primarily because of the hydronic heating and cooling system. Gas use for the building is higher than expected because of longer operating hours and poor performance of the boiler/absorption chiller.
1998-12-31
Organizational demands on the man-organization interface in nuclear power plant operation
International Nuclear Information System (INIS)
The partial project SR 2039/4 investigates organizational demands and factors of the man-organization interface. Thee study is divided into the sections inventory of rules and guidelines; evaluation of organizational structures and modes of operation, and working out of demand characteristics and evaluation criteria. The objective consists in representing, analyzing and evaluating the efficiency structure of sequence organization, and deriving practice-relevant concept proposals in order to optimize the man-organization interface. In this regard, the working out of control mechanisms for the evaluation of organizational sequences is of considerable importance as a kind of working aid. (orig./DG).
1994-04-01
Investigation of the transportation requirements for fusion power plants
This report presents a general investigation of the transport requirements associated with the construction and operation of conceptual fusion reactors. Projections of amounts of construction and operating materials requiring transportation are presented for several proposed designs. The material to be shipped is described along with the shipping containers that might be used, the transport modes and the expected impact of transporting these materials. Transportation of both radioactive and nonradioactive materials will be required. Most of these materials are routinely shipped by the transportation industry. Transportation requirements of a representative fusion reactor are also compared with Liquid Metal Fast Breeder Reactor (LMFBR) requirements.
1976-09-01
A study for good regulation of the CANDU's in Korea
Energy Technology Data Exchange (ETDEWEB)
The objective of project is to derive the policy recommendations to improve the efficiency of CANDU plants regulation. These policy recommendations will eventually contribute to the upgrading of Korean nuclear regulatory system and safety enhancement. During the second phase of this 2 years study, following research activities were done. Review the technical basis and framework of the new Canadian Regulation System and IAEA. Analysis on the interview of Wolsung operation staffs to identify important safety issues and regulation problems experienced at operation. Providing a plan of CANDU regulation system enhancement program.
2002-03-15
A low-neutron background slow-positron source.
Energy Technology Data Exchange (ETDEWEB)
The addition of a thermionic rf gun [1] and a photocathode rf gun will allow the Advanced Photon Source (APS) linear accelerator (linac) [2] [3] to become a free-electron laser (FEL) driver [4]. As the FEL project progresses, the existing high-charge DC thermionic gun will no longer be critical to APS operation and could be used to generate high-energy or low-energy electrons to drive a slow-positron source. We investigated possibilities to create a useful low-energy source that could operate semi-independently and would have a low neutron background.
1998-10-09
Energy Technology Data Exchange (ETDEWEB)
Lawrence Livermore National Laboratories` Zephyr System provides a showcase for the ways in which emerging technologies can help streamline procurement processes and improve the coordination between participants in engineering projects by allowing collaboration in ways that have not been possible before. The project also shows the success of a highly pragmatic approach that was initiated by the end user community, and that intentionally covered standard situations, rather than aiming at also automating the exceptions. By helping push purchasing responsibilities down to the end user, thereby greatly reducing the involvement of the purchasing department in operational activities, it was possible to streamline the process significantly resulting in time savings of up to 90%, major cost reductions, and improved quality. Left with less day-to- day purchasing operations, the purchasing department has more ...
1998-04-01
International Nuclear Information System (INIS)
The Wolsung-1 CANDU 600 MWe plant is now in operation. This paper provides an update on the design, construction and commissioning progress reported at last year's conference. The accomplishments of the past year are highlighted with emphasis on how the station has been commissioned in preparation for commercial service and on the skills that were dedicated to the completion of the project. The paper also deals with some of the features of the CANDU 600 MWe Nuclear Power Plant that make it viable for export.
1977-06-05
Energy Technology Data Exchange (ETDEWEB)
Success in improving hydropower project efficiency has opened more global markets for variable-speed generator technology. Manufacturers continue to test the markets as the technology evolves. The potential of variable-speed application becomes evident considering that more than 150 pumped storage plants, with a combined capacity exceeding 100,000 MW, are in operation globally.
1993-10-01
Tube problems: worldwide statistics reviewed
International Nuclear Information System (INIS)
EPRI's Steam Generator Strategic Management Project issues an annual report on the progress being made in tackling steam generator problems worldwide, containing a wealth of detailed statistics on the status of operating units and degradation mechanisms encountered. A few highlights are presented from the latest report, issued in October 1993, which covers the period to 31 December 1992. (Author).
Return on investment (ROI) proposal preparation guide
Energy Technology Data Exchange (ETDEWEB)
The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding.
1998-10-09
Reliability analysis of diesel generators of Wolsung unit 1
Energy Technology Data Exchange (ETDEWEB)
As a maintenance optimization project to improve the safety of Wolsung NPP (Nuclear Power Plant), reliability of diesel generators are estimated based on the operating experience, and improvement options are suggested. A reliability measure is suggested for the estimation of reliability for standby safety systems to reflect availability. It is assessed that the reliability of diesel generators can be mush improved if the suggested improvement options are implemented. (Author) 6 refs., 1 tab.
1997-05-01
Reliability analysis of diesel generators of Wolsung Unit 1
Energy Technology Data Exchange (ETDEWEB)
As a maintenance optimization project to improve the safety of Wolsung NPP (Nuclear Power Plant), reliability of diesel generators are estimated based on the operating experience, and improvement options are suggested. A reliability measure is suggested for the estimation of reliability for standby safety systems to reflect availability. It is assessed that the reliability of diesel generators can be much improved if the suggested improvement options are implemented.
1997-05-01
... Targeted fields of research Continuation of ongoing research - Finalising detailed design work on the ITER project; getting JET operational at full power; Improvement of the basic concepts of fusion devices - Fusion plasmas; theoretical studies; technology watch on research into inertial confinement; new experimental concepts and systems; etc.; Long-term technology - Preparations for building a demonstration reactor (development of tritium breeding blankets; prospective ...
Offshore: North Sea facility gets the CETCO solution
British Library Electronic Table of Contents (United Kingdom)
CETCO Oilfield Services, suppliers of environmental systems, have undertaken a project to treat contaminated water returns on a Floating, Production, Storage and Offloading (FPSO) facility in the North Sea. The solution sees fluids treated during oil well clean-up operations, reducing the potential for overboard oil discharges, and resulting production upsets.
2006-01-01
Energy Technology Data Exchange (ETDEWEB)
HEW is operating one of the biggest district heating networks of the Federal Republic of Germany. The paper discusses a number of projects which in recent years have been engaged in extensive air pollution abatement measures to make district heating an environmentally compatible energy source. Emphasis is placed on the hot gas cleanup system of block 2 of the harbor power plant. The system is the first of its kind to have realized an SCR system connected with the desulfurization system for industrial denitrification purposes.
1988-01-01
Interview with Reyes Alemany Fernandez - Engineer in charge Operations Group
Q. 1. What has it taken to get the LHC project from its beginnings to the verge of first beams? Q. 2. What can be expected to happen on First Beam Day? Q. 3. What happens next in the story? Q. 4. What does this mean to you personally?
2008-01-01
Energy Technology Data Exchange (ETDEWEB)
The purpose of the project is to further develop a Danish natural gas reformer system including optimisation of subsystems and the overall system consisting of a natural gas reformer and fuel cell CHP generator. This will contribute to the evaluation of to what extend Denmark shall develop small reformer units for PEM fuel Cells. In the project a reformer system with a high degree of automatic control has been build that fulfils the CHP requirements to operation time, dynamics etc. This work, with a FP05 reformer unit, has given valuable results concerning the possibilities and limitations of the reformer technology for CHP usage. It is important that the reformer and fuel cell units are designed with matching yields to optimise efficiency, turn-down start-up time etc. The burner that delivers heat for the steam reaction shall be able to use natural gas as fuel. This gives the possibility of using existing burner ...
2006-11-03
Energy Technology Data Exchange (ETDEWEB)
Past and current development of coal utilization technology in the Japanese steel industry is reviewed and some projects currently under research and development briefly described. These include DIOS, an iron making process which directly utilizes both iron ore and coal without a sintering plant or a coke oven; and the development of a new generation coke oven. 15 figs.
1994-12-31
This report contains data collected on a monthly basis over the period April, 1973 - April, 1975 for dustfall particulates, sodium and chloride and SO2 levels obtained from 12 monitoring sites near the Chalk Point Generating Station operated by PEPCO and ...
1976-01-01
Anodic protection: theory and practice in the prevention of corrosion
Energy Technology Data Exchange (ETDEWEB)
Theoretical and practical aspects of anodic protection for control of corrosion by a wide range of acidic and alkaline solutions are discussed. Chapters are included concerning strategic importance of metals and alloys in modern industry, applications to industrial equipment, descriptions of equipment used in the technique; design, operation and maintenance; economics, scientific principles, characteristics of potentiostats, laboratory tests and procedures, selected application examples and projected future uses. A section is devoted to electrochemical principles.
1981-01-01
Analysis of a 1200 kV circuit breaker for a gas insulated substation. Final report
Energy Technology Data Exchange (ETDEWEB)
This report describes the work carried out to analyze and design a circuit for use in 1200 kV gas insulated substations. The first part of the project was devoted to a thorough analysis of the requirements for the circuit breaker from the standpoint of the electrical system in which it would operate. A conceptual design was selected and all of the components of the circuit breaker were designed, modeled and verified. Finally a plan was prepared for the construction of a complete circuit breaker.
1985-01-01
Accelerated aging speeds test of instrument reliability
International Nuclear Information System (INIS)
Safety-related instrument in nuclear power plants must be checked for reliability over their projected operating life. A method of conducting accelerated aging tests is presentd. It uses the Arrhenius activation energy concept and manipulation of the parameters of the test e.g. by raising test temperature, by relying on a model characterizing the chemical-related reactions of materials.
1982-01-01
Test results show that adding adipic acid to the limestone slurry significantly improved the SO sub 2 removal efficiency of the FGD system. Limited baseline data on operations with limestone only indicated a performance level of 55% SO sub 2 removal. Adding about 2200 ppM of adip...
Populations of a common forage fish, red shiner Notropis lutrensis, were sampled from four localities on the Brazos River, Texas, affected by cold-water discharge from a hydroelectric dam and from unaltered sites in the same region. Polymorphism at the Mdh-B locus, encoding supernatant malate dehydrogenase, indicates that populations within 57 km of the dam are distinctive from other regional populations and possess a unique Mdh-B allele, have significantly higher levels of heterozygosity at the Mdh-B locus, represent a homogeneous set that have significantly different Mdh-B zygotic frequencies from other regional populations, and have significantly different Mdh-B zygotic proportions than would be expected under a Hardy-Weinberg equilibrium. Increased levels of heterozygosity in fish within 57 km of the dam were correlated with discharge-associated fluctuations in water temperature at sampling stations.
1981-05-01
International Nuclear Information System (INIS)
The thermal regime immediately downstream from bottom release reservoirs is often characterized by reduced diel and seasonal (winter warm/summer cool) conditions. These unusual thermal patterns have often been implicated as a primary factor underlying observed downstream changes in the species composition of aquatic macroinvertebrate communities. The potential mechanisms for selective elimination of benthic species by unusual thermal regimes has been reviewed. Although the effects of temperature on the rate and magnitude of larval growth and development has been included in the list of potential mechanisms, only recently have field studies below dams focused on this interrelationship. This study investigates the overall community structure as well as the seasonal pattern of larval growth and development for several univoltine species of insects in the Delaware River below or near the hypolimnetic discharge of the Cannonsville and Pepeacton ...
CleverFarm - A SuperSCADA system for wind farms
Energy Technology Data Exchange (ETDEWEB)
The CleverFarm project started out to build an integrated monitoring system for wind farms, where all information would be available and could be used across the wind farm for maintenance and component health assessments. This would enable wind farm operators to prioritise their efforts, since they have a good view of the farm status from home. A large emphasis was placed on the integration of condition monitoring approaches in the central system, enabling estimates of the remaining lifetime of components, especially in the nacelle. During the 3,5 years of the project, software and hardware was developed and installed in two wind farms in Denmark and Germany. The connected hardware included two different condition monitoring systems based on vibration sensors from Gram&Juhl and ISET, plus a camera system developed by Overspeed. Additionally, short-term predictions of the wind farm output were delivered by DMI and ...
2004-08-01
Energy Technology Data Exchange (ETDEWEB)
The project aim is to model the hybrid plant at Vaesthamnsverket in Helsingborg using artificial neural networks (ANN) and integrating the ANN models, for online condition monitoring and thermoeconomic optimization, at Vaesthamnsverket. The definition of a hybrid plant is that it uses more than one fuel, in this case a natural gas fuelled gas turbine with heat recovery steam generator (HRSG) and a biomass fuelled steam boiler with steam turbine. The project is a continuation of previous projects where ANN training was done with operational data from the plant. The ANN models have, if required, been updated to better suit the purpose of this project. The thermoeconomic optimization takes into account current electricity prices, taxes, fuel prices etc. and calculates the current production cost along with the 'predicted' production cost. The tool also has a built in ...
2007-12-15
British Library Electronic Table of Contents (United Kingdom)
Our understanding of prenatal behavior has been significantly advanced by techniques for direct observation and manipulation of unanesthetized, behaving rodent fetuses with intact umbilical connections to the mother. These techniques involve brief administration of an inhalant anesthesic, enabling spinal transection of the rat or mouse dam, after which procedures can continue with unanesthetized dams and fetuses. Because anesthetics administered to the mother can cross the placental barrier, it is possible that fetuses are anesthetized to varying degrees. We compared in perinatal rats the effects of prenatal maternal exposure to two inhalant anesthetics: ether and isoflurane. Fewer spontaneous fetal movements and first postpartum nipple attachments were observed following maternal exposure...
2007-01-01
British Library Electronic Table of Contents (United Kingdom)
Riparian zones of streams in northwestern Mississippi have been impacted by agriculture, channelization, channel incision, and gully erosion. Riparian gully formation has resulted in the fragmentation of remnant riparian zones within agricultural watersheds. One widely used conservation practice for controlling gully erosion is the installation of drop pipes. This practice involves placing earthen dams across eroding gullies and embedding a metal standpipe within the dam to convey water from the field to stream level. Installation of this structure halts gully erosion and incidentally replaces eroding gullies with riparian habitats. Previous research evaluating gully erosion control structures have not considered the ecological impacts of these conservation practices on amphibian and repti...
2009-01-01
Energy Technology Data Exchange (ETDEWEB)
Information about current and projected waste generation as well as available treatment, storage, and disposal (TSD) capabilities and needs is crucial for effective, efficient, and safe waste management. This is especially true for large corporations that are responsible for multisite operations involving diverse and complex industrial processes. Such information is necessary not only for day-to-day operations, but also for strategic planning to ensure safe future performance. This paper reports on some methods developed and successfully applied to obtain requisite information and to assist waste management planning at the corporate level in a nationwide system of laboratories and industries. Waste generation and TSD capabilities at selected US Department of Energy (DOE) sites were studied. 1 ref., 2 tabs.
1988-01-01
Report documents O M at pumped-storage plants
Energy Technology Data Exchange (ETDEWEB)
The Electric Power Research Institute has published a report for planners, designers, owners, and operators of hydroelectric pumped-storage plants that records the operation and maintenance knowledge of 35 domestic and foreign pumped-storage projects. The report provides a comprehensive record of practices that have reduced forced outages and shortened scheduled repairs. As time passes and experienced staff retire at pumped-storage plants, many O M lessons are lost. To remedy that situation, EPRI commissioned Morrison-Knudsen Engineers Inc. to prepare a special report. The 348-page publication records the accumulated civil, geotechnical, mechanical, and electrical O M knowledge and experiences of pumped-storage plant staff. It also includes recommendations to planners and designers of future pumped-storage plants and concludes with descriptions of O M experiences reported by plant operators and utility ...
1991-12-01
Technology development, evaluation, and application (TDEA) FY 1997 progress report
Energy Technology Data Exchange (ETDEWEB)
The public expects that the Los Alamos National Laboratory (LANL) will operate in a manner that prevents negative impacts to the environment and protects the safety and health of its employees and the public. To achieve this goal within budget, the Department of Energy (DOE) and LANL must develop new and improved environment, safety, and health (ES and H) technologies and implement innovative, more cost-effective ES and H approaches to operations. In FY95, the Environment, Safety, and Health (ESH) Division initiated a Technology Development, Evaluation, and Application (TDEA) program. The purpose of this unique program is to test and develop technologies that solve LANL ES and H problems and improve the safety of LANL operations. This progress report presents the results of 10 projects funded in FY97 by the TDEA Committee of the Environment, Safety, and Health Division. Products generated from the ...
1998-05-01
Energy Technology Data Exchange (ETDEWEB)
The EMP consists of a Compliance Monitoring Sampling Program and a Supplemental monitoring Sampling Program. The Compliance Monitoring Sampling Program will be conducted during a summer and a winter Baseline periods during the Pre-Construction/Construction phases of the Project and during a summer and a winter period following the successful Startup and Operational phase of the completed Project. compliance monitoring consist of conducting all the sampling and observation programs associated with existing required Federal, State, and Local Regulations, Permits and Orders. These include air, water, and waste monitoring and OSHA and NESHAP monitoring. The Supplemental Monitoring Program will also be conducted during a summer and a winter Baseline periods during the Pre-Construction/Construction phases of the Demonstration Facility and during a summer and a winter period following the successful startup and ...
1992-09-21
Innovative coke oven gas cleaning system for retrofit applications
Energy Technology Data Exchange (ETDEWEB)
The EMP consists of a Compliance Monitoring Sampling Program and a Supplemental monitoring Sampling Program. The Compliance Monitoring Sampling Program will be conducted during a summer and a winter Baseline periods during the Pre-Construction/Construction phases of the Project and during a summer and a winter period following the successful Startup and Operational phase of the completed Project. compliance monitoring consist of conducting all the sampling and observation programs associated with existing required Federal, State, and Local Regulations, Permits and Orders. These include air, water, and waste monitoring and OSHA and NESHAP monitoring. The Supplemental Monitoring Program will also be conducted during a summer and a winter Baseline periods during the Pre-Construction/Construction phases of the Demonstration Facility and during a summer and a winter period following the successful startup and ...
1992-09-21
India`s first solar chicken brooder
Energy Technology Data Exchange (ETDEWEB)
A 1,200 bird solar chicken brooder was indigenously designed and operated by the Indian scientists for the first time in the country as a Project under funding by the Ministry of Non Conventional Energy Sources to the All India Women`s Conference. This multi disciplinary project was taken up on the International Sun Day, May 3, 1993 and completed on May, 1994. Data has been collected for the first nine months of operation. Its successful operation has justified multi disciplinary approach. The solar chicken brooder incorporates modern poultry concepts of breeding under controlled temperatures. In view of the mixed climate of Delhi, provision was made for heating and cooling both to take care of the 24 hour cycle. Comfort conditions have been identified and maintained (as is done in the their genetic characteristics) at different temperatures for a period of 8--10 weeks to grow them ...
1995-12-31
White Rose sustains east coast development
Energy Technology Data Exchange (ETDEWEB)
The White Rose Oil Project, located in the Jeanne d'Arc Basin 350 km east of St. John's, is reported to continue paying benefits for the oil and gas industry in eastern Canada. The operator, Husky Energy, is said to be on target and expects first oil from the project in late 2005 or early 2006. Peak production for the White Rose Field is projected at 100,000 bbl/d. The project has a total capital cost of $2.35 billion. The first phase of the project, comprised of four wells, including an oil producer, was completed in July. The estimated productive capacity of this well is between 25,000 and 35,000 bbl/d. Other major milestones achieved at the White Rose project include movement of the topside modules onto the Sea Rose floating production, storage and offloading (FPSO) vessel, consisting of 17 lifts during the seven-week ...
2004-11-01
Energy Technology Data Exchange (ETDEWEB)
One of the five projects selected for funding within the Clean Coal Technology Program is a project proposed by the Pennsylvania Electric Company (Penelec) of Johnstown, Pennsylvania. Penelec proposes to enter into a cooperative agreement with DOE to design, construct and operate a 600 ton-per-day, 66-megawatt (MWe), coal-fueled, externally-fired combined cycle (EFCC) electric power generation facility. The EFCC is an emerging technology with promise for operating highefficiency combined gas- and steam-turbine cycles on coal. The central feature of EFCC is its coupling of the gas turbine to an external, atmospheric-pressure, coal combustor via a hightemperature ceramic heat exchanger (CerHx{reg_sign}) developed by Hague International. The EFCC technology is attractive because, unlike competing combined cycles such as Integrated Gasification (IGCC) and Pressurized Fluidized Bed Combustion (PFBC), it ...
1994-06-01
Energy Technology Data Exchange (ETDEWEB)
In order to serve for efficient energy utilization and environmental improvement in the Republic of Vietnam, a 'Model project to reduce electric power consumption at cement burning plant' has been implemented. This paper summarizes the achievements. This project is intended to add an advanced, matured and reliable electric power generation facility using cement waste heat to the existing cement plant in Vietnam to produce steam and generate power by utilizing the waste heat generated from the preheating process in the burning plant. The present project has performed the detailed designing on the piping, electric facilities and instrumentation based on the basic agreement on the project. Fabrication of the piping has been executed by the Vietnam side. Valves and electric devices were procured and transported, including those fabricated in the previous fiscal year. Technology guiding ...
2002-03-01
Two dimensional NMR and NMR relaxation studies of coal structure
Energy Technology Data Exchange (ETDEWEB)
This report covers the progress made on the title project for the project period. Four major areas of inquiry are being pursued. Advanced solid state NMR methods are being developed to assay the distribution of the various important functional groups that determine the reactivity of coals. Special attention is being paid to methods that are compatible with the very high magic angle sample spinning rates needed for operation at the high magnetic field strengths available today. Polarization inversion methods utilizing the difference in heat capacities of small groups of spins are particularly promising. Methods combining proton-proton spin diffusion with [sup 13]C CPMAS readout are being developed to determine the connectivity of functional groups in coals in a high sensitivity relay type of experiment. Additional work is aimed at delineating the role of methyl group rotation in the proton NMR relaxation behavior of coals.
1992-11-25
The Daya Bay nuclear power plant performance. An example of international cooperation
International Nuclear Information System (INIS)
Technology transfer is an integral part of Framatome's general approach to its Chinese partners for the Daya Bay, Ling Ao, and Qinshan phase 2 nuclear power plant projects. It has been the subject of major operations covering all activities relevant to project management, design and engineering, manufacturing, and maintenance know-how. This presentation is more particularly devoted to nuclear island maintenance knowledge, which has been extensively transferred by Framatome to the Daya Bay plant owner over a period of four years, through a program including the constitution of mixed Franco-Chinese teams to handle plant maintenance, shadow training of Chinese specialists in the maintenance work performed by Framatome or its subcontractors in France, and theoretical training sessions on equipment mockups in China and France. (author)
1998-10-25
Energy Technology Data Exchange (ETDEWEB)
Currently the construction of small-scale hydroelectric and pumped storage plants is booming in the USA. The technology is attractive because of its relatively cheap construction methods and operation. Electric utilities are seeing it as a viable source of peaking power and a means of system regulation. Two schemes are described. One is a high-head/small flow river project designed to generate 3.5 MW and is about to come on line having overcome tight environmental and commercial constraints. The second is a pumped-storage project using two man-made reservoirs with an average elevation difference of 1280 ft. It is deemed to be of minimum environmental impact construction and good physical characteristics. Completion is hoped for by 1995 and the plant will deliver 1000 MW. (UK)
1994-04-01
Proposed roadmap for overcoming legal and financial obstacles to carbon capture and sequestration
Energy Technology Data Exchange (ETDEWEB)
Many existing proposals either lack sufficient concreteness to make carbon capture and geological sequestration (CCGS) operational or fail to focus on a comprehensive, long term framework for its regulation, thus failing to account adequately for the urgency of the issue, the need to develop immediate experience with large scale demonstration projects, or the financial and other incentives required to launch early demonstration projects. We aim to help fill this void by proposing a roadmap to commercial deployment of CCGS in the United States.This roadmap focuses on the legal and financial incentives necessary for rapid demonstration of geological sequestration in the absence of national restrictions on CO2 emissions. It weaves together existing federal programs and financing opportunities into a set of recommendations for achieving commercial viability of geological sequestration.
2009-03-01
International Nuclear Information System (INIS)
This article describes the project for the installation of an additional emergency diesel generator in both Asco and Vandellos NPPs. The basic objectives of this project are to improve the availability of the emergency generation system, in order to provide greater ability to address potential contingencies, and also to increase the flexibility of the preventive periodic maintenance of the emergency diesel generators. This maintenance, that is currently a milestone of the critical path of the refueling outage, will be performed on-line. The new diesel generator will be sized to support all the loads considered in the safety case and also the consumption of its own auxiliary systems, and will be tested for operability assessment on the same periodical basis than the existing ones. The solution adopted will also permit that the N diesel generator may be connected to any bus bar class 1E in a station black-out scenario. ...
Energy Technology Data Exchange (ETDEWEB)
The 'KUPOLOPT' joint research project has as its target the economic and ecological optimization of cupola furnaces in foundries. The use of natural gas/oxygen burners during foundry operation is being studied on Fritz Winter Eisengiesserei GmbH and Co. KG's cupola furnace with the objective of enhancing melting rate, reducing emissions and permitting re-utilization of foundry and other particulates. This work is also intended to improve the cupola-furnace process in economic terms, in order to enhance its competitiveness. This article presents the results of the first project phase, which served to investigate the natural gas/oxygen burner as an external supplier of energy. (orig.)
2003-11-01
Energy Technology Data Exchange (ETDEWEB)
A new technique has been developed for the measurement of steam mass flowrate, water mass flowrate and total enthalpy of two-phase fluids produced from geothermal wells. The method involves precisely metered injection of liquid and vapor phase tracers into the two-phase production pipeline and concurrent sampling of each phase downstream of the injection point. Subsequent chemical analysis of the steam and water samples for tracer content enables the calculation of mass flowrate for each phase given the known mass injection rates of tracer. This technique has now been used extensively at the Coso geothermal project, owned and operated by California Energy Company. Initial validation of the method was performed at the Roosevelt Hot Springs geothermal project on wells producing to individual production separators equipped with orificeplate flowmeters for each phase.
1993-01-28
Energy Engineering Analysis Program, Limited Energy Study, Fort Hunter-Liggett, California. Volume I
This report summarizes all work of the Limited Energy Study, Energy Engineering Analysis Program (EEAP), Fort Hunter Liggett, California, authorized under Contract Number DACA05-92-C-0155 with the U.S. Army Corps of Engineers, Sacramento District, California. The purpose of this study is to develop projects and actions that will reduce facilities energy consumption and operating costs at Fort Hunter Liggett. Implementation of these projects will contribute to achieving the goal of the Army Facilities Energy Plan of a reduction in energy consumption per square foot of building floor area of 20 percent by FY2000 from FY1985 baseline levels.
1993-07-01
Energy Technology Data Exchange (ETDEWEB)
This guidebook concerns the design of air-conditioning and air-treatment installations in recent and old buildings. The design of indoor atmosphere treatment systems is based on a rigorous and safe methodology. The following aspects are reviewed: situation of ambient air treatment, different aspects of a project, humid-air technique, principles of air treatment, basic conditions for a successful project, determination of enthalpy and hydric loads of rooms, design of ambient treatment systems, cold water production using a thermodynamical system, aeraulics, hydraulics, acoustics, logics of operation, forecasting of energy consumptions, global management of air-conditioning installations, ambient air-treatment systems. (J.S.)
1999-07-01
Energy Technology Data Exchange (ETDEWEB)
The follow-up system for wastes (JAeSTI), developed at the end of the 1990s, forms a basis for today's followup activities in Finland. JAeSTI relies on an environmental protection database, the compliance monitoring system VAHTI operated by the environmental authorities. Waste followup and waste statistics depend very much on the annual waste quantities recorded in the VAHTI system. In the KYJ-project the coverage and reliability of the data in the VAHTI system was evaluated as for the streams of solid municipal waste. The project also included the compiling of national statistics on municipal waste for the year 2000. The project used other information sources, too, such as statistics compiled when the National Waste Plan and regional waste plans were revised in 2002. In addition, the extent and quantity of in-situ (household) composting and incineration were assessed on the basis of a separate ...
2004-07-01
Energy Technology Data Exchange (ETDEWEB)
This annual report describes the progress during the fourth year of the project on {open_quotes}Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance{close_quotes}. The project involves using an integrated approach to characterize the reservoir followed by proposing an appropriate reservoir management strategy to improve the field performance. In the first stage of the project, the type of data we integrated include cross borehole seismic surveys, geological interpretation based on the logs and the cores, and the engineering information. In contrast, during the second stage of the project, we intend to use only conventional data to construct the reservoir description. This report covers the results of the implementation from the first stage of the project. It also discusses the work accomplished so far for the second stage of the ...
1997-01-01
Gas Storage Technology Consortium
Energy Technology Data Exchange (ETDEWEB)
Gas storage is a critical element in the natural gas industry. Producers, transmission and distribution companies, marketers, and end users all benefit directly from the load balancing function of storage. The unbundling process has fundamentally changed the way storage is used and valued. As an unbundled service, the value of storage is being recovered at rates that reflect its value. Moreover, the marketplace has differentiated between various types of storage services and has increasingly rewarded flexibility, safety, and reliability. The size of the natural gas market has increased and is projected to continue to increase towards 30 trillion cubic feet over the next 10 to 15 years. Much of this increase is projected to come from electric generation, particularly peaking units. Gas storage, particularly the flexible services that are most suited to electric loads, is crucial in meeting the needs of these new markets. To address the gas ...
2007-06-30
DECOVALEX II. The summary report of the Finnish contributions 1995-1999
Energy Technology Data Exchange (ETDEWEB)
During the years 1995-1999, an international effort was going on under the title DECOVALEX II, in order to study the coupled thermo-hydro-mechanical (THM) effects in the water containing fractured rock mass caused by the heat generation of spent fuel canisters in a repository. The project was a continuation project of DECOVALEX (1991-1996). The name comes from the acronym 'an international co-operative project for the DEvelopment of COupled models and their VALidation against EXperiments in nuclear waste isolation'. Radiation and Nuclear Safety Authority (STUK) was one of the eleven Funding Organizations in the international project. STUK's Research Team was the Technical Research Centre of Finland, VTT Communities and Infrastructure. To support and coordinate the national research work, STUK formed a National DECOVALEX II Group (NDG). The group had ...
2000-03-01
Energy Technology Data Exchange (ETDEWEB)
This article describes acoustic methods used in the in-service inspection of the dams and peripheral concrete structures of the Toktogul, Kurpsai, and Bratsk hydroelectric and pumped storage plants. The tests were conducted to assess the compression strength, elasticity, and tensile strength of the concretes. Comparative evaluations against drill core studies proved the acoustic methods to be sufficiently accurate in predicting aging behavior and loss of mechanical and physical integrity in the concretes.
1987-09-01
Unusual Recharge Processes near Arroyos of the Rio Grande Aquifer, El Paso/Juarez Area
The twin-cities of El Paso and Juarez share the water resources of the Hueco Bolson aquifer and overlying Rio Grande aquifer. Both aquifers span the international border between Mexico and the United States. Salinity in the Rio Grande aquifer varies widely, some parts of the shallow aquifer containing less than 1,000 mg/L total dissolved solids (TDS), other parts of the aquifer exceeding 5,000 mg/L TDS. One sizable part of the "Lower Valley" area, approximately 45 km below El Paso contains very dilute water near the outer edge of the floodplain. Historically it had been thought that the dilute waters in this location were derived from recharge from arroyos that drained proximal parts of the Hueco Bolson. Instead, our hydrogen and oxygen isotope data and carbon-14 data indicate that these dilute waters were derived from pre-dam infiltration of the Rio Grande. Relatively light and slightly evaporated pre-dam waters (-11.5 del O18) at the ...
2005-12-01
Architectural design for reliability
Energy Technology Data Exchange (ETDEWEB)
Design-for-reliability concepts can be applied to the products of the construction industry, which includes buildings, bridges, transportation systems, dams, and other structures. The application of a systems approach to designing in reliability emphasizes the importance of incorporating uncertainty in the analyses, the benefits of optimization analyses, and the importance of integrating reliability, safety, and security. 4 refs., 3 figs.
1997-08-01
Pre-operational monitoring plan for LIL waste disposal at Saligny
International Nuclear Information System (INIS)
Developed under the PN II Project 71-009 - MONA, the pre-operational monitoring program of the LIL waste disposal site presented in this paper covers the main elements requested for a continuous improvement of site characterization and safety assessment, as well as for the set up of the baseline data requested for the future operational and post-operational monitoring and surveillance. These elements are: vadose and saturated zones hydrogeology, surface erosion, meteorology and radionuclides content in waters, soil and biota. Pairs of TDR (Time Domain Reflectometry) and pressure sensors, coupled with a meteorological station have been installed on site for the continuously measurement of the water content and matric potential changes due to the climate variations. The data will be used to follow the water balance, the pores water velocity and to calculate the infiltration rate. A new set of erosion ...
2009-10-12
The Earth in energy troubles; La Planete en mal d'energie
Energy Technology Data Exchange (ETDEWEB)
This document gathers the available presentations (articles and transparencies) given at this annual meeting, the 2007 topic of which was the technological, geopolitical, economical, environmental, societal and development stakes of energy. 1 - technological stakes - which energies for the future: new energies, illusion or solution of the future; the Lorraine region, an energy land: strategies and stakes for a sustainable development; from China to Brazil: understanding the nuclear energy revival; hydroelectric power: renewable and sustainable energy; renewable energies and environment protection: the contribution of biofuels; wind power in Germany between success and contestation; 2 - geopolitical stakes - energy levier of power: the Gulf of Guinea hydrocarbons: between development and geopolitics; the complex evaluation of resources and reserves between technology, market and geopolitics; the new Bakou-Tbilissi-Ceyhan pipeline: what impacts for Turkey and the European Union; 3 - ...
2007-07-01
Wind power data transmission challenges; Les defis de la transmission de donnees en eolien
Energy Technology Data Exchange (ETDEWEB)
This presentation outlined the corporate history of the Ohmega Group, a small company from Gaspe, Quebec which offers consulting services to the automation and telecommunication sector. It was created in 1982 and has been involved with the wind power industry since 1996. The main services provided by Ohmega Group include electrical and mechanical construction and maintenance services. This paper also reviewed the benefits of using Supervisory Control and Data Acquisition (SCADA) systems in the wind power industry to monitor, control and collect data from wind turbines. The Ohmega Group has provided consulting services to Cartier Wind Energy Inc., a company that was awarded several wind turbine projects by Hydro-Quebec Distribution. The Ohmega Group applied the SCADA system at the Baie des Sables, Anse a Valleau and Carleton wind turbine arrays. The typical architecture of SCADA systems on a wind farm was presented along with Hydro-Quebec's specifications ...
2008-07-01
U. K. continental shelf due 800 miles of pipeline in 1993
This paper reports that more than 800 miles of pipeline will come into service on the U.K. continental shelf during 1993, surpassing by 75% the previous record set in 1977. About 3,500 miles of pipeline is in place. Commissioning of the Miller natural gas pipeline and Scottish Area Gas Evacuation (SAGE) network this year and start-up of the Central Area Transmission System (CATS) next year will bring more than 600 miles of pipeline into use during 1993. The projects are part of a recent development boom in the central North Sea. In a review of U.K. offshore pipeline, analyst County Natwest Woodmac reported that projects totaling about 1,250 miles of pipeline have been sanctioned but are not yet operating. Two thirds of this total is gas pipeline, while 60s made up of main lines from shore to platform. County Natwest says that in most cases spur lines will be used to connect new fields with existing infrastructure. The ...
1992-08-17
The Los Alamos National Laboratory Transuranic Waste Retireval Project
Energy Technology Data Exchange (ETDEWEB)
This paper presents the status of the Los Alamos National Laboratory (LANL) project for remediation of transuranic (TRU) and TRU mixed waste from Pads 1, 2, and 4. Some of the TRU waste packages retrieved from Pad I are anticipated to be part of LANL`s initial inventory to be shipped to the Waste Isolation Pilot Plant (WIPP) in April 1998. The TRU Waste Inspectable Storage Project (TWISP) was initiated in February 1993 in response to the New Mexico Environment Department`s (NMED`s) Consent Agreement for Compliance Order, ``New Mexico Hazardous Waste Agreement (NMHWA) 93-03.`` The TWISP involves the recovery of approximately 16,865 TRU and TRU-mixed waste containers currently under earthen cover on Pads 1, 2, and 4 at Technical Area 54, Area G, and placement of that waste into inspectable storage. All waste will be moved into inspectable storage by September 30, 2003. Waste recovery and storage operations emphasize ...
1997-02-01
Measurements on the Magdalen Islands VAWT and future projects
Energy Technology Data Exchange (ETDEWEB)
The rebuilt rotor of the 224 kW Magdalen Islands VAWT was installed in 1979 and has been operating at its design speed (36.6 rpm) for about one year. Agreement between measured and theoretical performance is generally good except that maximum power may exceed theoretical predictions. Measurements of drive train losses, torque and power ripple, and rotor stresses are discussed. Although peak-to-peak cyclic stress levels are low in relation to fatigue life limits, spectral analysis of stress data indicates that the 3-per-rev component is amplified by near-resonance with the first butterfly blade mode. This resonance was subsequently de-coupled by a damped connection between the blade struts and the central column. The major future project in the Canadian program is the design, construction and testing of a megwatt-scale VAWT in cooperation with Hydro Quebec. Preliminary desigh details of this turbine, known as Project Aeolus ...
1981-10-06
Energy Technology Data Exchange (ETDEWEB)
Eaton, in partnership with Oak Ridge National Laboratory and the Electric Power Research Institute (EPRI) has completed a project that applies a combination of wireless sensor network (WSN) technology, anticipatory theory, and a near-term value proposition based on diagnostics and process uptime to ensure the security and reliability of critical electrical power infrastructure. Representatives of several Eaton business units have been engaged to ensure a viable commercialization plan. Tennessee Valley Authority (TVA), American Electric Power (AEP), PEPCO, and Commonwealth Edison were recruited as partners to confirm and refine the requirements definition from the perspective of the utilities that actually operate the facilities to be protected. Those utilities have cooperated with on-site field tests as the project proceeds. Accomplishments of this project included: (1) the design, modeling, and ...
2007-03-31
Ice engineering advances : their impact on development concepts
Energy Technology Data Exchange (ETDEWEB)
The Hebron offshore drilling project in Atlantic Canada was discontinued in 2002 due to economic challenges. Chevron-Texaco has conducted small-scale studies to find ways to improve the project's viability. One of the main challenges facing this offshore drilling project is the issue of iceberg scour and its effect on seafloor equipment. This paper demonstrates how advances in ice engineering have resulted in new and cost-effective development concepts for: central gravity base structures; wellhead gravity base structures; floating production, storage and offloading (FPSO) subsea facilities; and, long subsea tieback and trench optimization. New studies have provided a better understanding of ice contact pressures, drift velocities, iceberg management and interaction processes. New designs for gravity base structures can reduce wave loads. The selection of a new development concept is determined by economic ...
2004-07-01
Free release waste characterisation during the decommissioning of windscale Pile 2 Chimney
International Nuclear Information System (INIS)
The decommissioning of windscale Pile 2 Chimney resulted in the removal of one of most historically significant and prominent features of the Sellafield site. The project was the first large scale concrete ''free release'' operation to be undertaken on the Sellafield nuclear site, producing 4500 tons of concrete of which 3000 tons was demonstrated to be ''free release''. The paper describes the radiometric techniques employed in the characterisation and segregation of the concrete into low level waste (LLW), very low level waste (VLLW) and free release categories. It examines the robust solutions that were developed to meet the technical and regulatory challenges of the project, which included the definition of free release, the selection of averaging volumes, the testing and validation of the monitoring systems employed for ton quantities of concrete and the identification and removal of small numbers of fuel particles ...
2002-09-22
Diesel fueled ship propulsion fuel cell demonstration project
Energy Technology Data Exchange (ETDEWEB)
The paper describes the work underway to adapt a former US Navy diesel electric drive ship as a 2.4 Megawatt fuel cell powered, US Coast Guard operated, demonstrator. The Project will design the new configuration, and then remove the four 600 kW diesel electric generators and auxiliaries. It will design, build and install fourteen or more nominal 180 kW diesel fueled molten carbonate internal reforming direct fuel cells (DFCs). The USCG cutter VINDICATOR has been chosen. The adaptation will be carried out at the USCG shipyard at Curtis Bay, MD. A multi-agency (state and federal) cooperative project is now underway. The USCG prime contractor, AEL, is performing the work under a Phase III Small Business Innovation Research (SBIR) award. This follows their successful completion of Phases I and II under contract to the US Naval Sea Systems (NAVSEA) from 1989 through 1993 which successfully demonstrated the feasibility of diesel ...
1996-12-31
Energy Technology Data Exchange (ETDEWEB)
This report describes the activities, conclusions, and recommendations of the Workshop on Evaluation Systems for Renewable Energy Systems sponsored by the Agency for International Development and SERI, held 20-22 February 1980 in Golden, Colorado. The primary objectives of the workshop was to explore whether it was possible to establish common information elements that would describe the operation and impact of renewable energy projects in developing countries. The workshop provided a forum for development program managers to discuss the information they would like to receive about renewable energy projects and to determine whether common data could be agreed on to facilitate information exchange among development organizations. Such information could be shared among institutions and used to make informed judyments on the economic, technical, and social feasibility of the technologies. Because developing countries and ...
1980-06-01
Design of an onboard battery charger for an electric vehicle
Energy Technology Data Exchange (ETDEWEB)
This report describes the design of an on-board battery charger for an electric car. There are already various battery charger units on the market. However, these are not specifically designed for this application, and consequently do not provide an ideal solution. Because these products are not specific to one application, and instead opt to cover a variety of briefs, they are not ideal. They also tend to be heavier and more expensive than if the charger was built specifically for one purpose. The main design considerations were that the charger should be compact and lightweight. It was also specified that the design should be able to operate using either the single-phase or three-phase AC supply. Before the design process for the battery charger could commence, it was necessary for the author to get an appreciation of power electronics, since he had no previous experience in the subject. The author focused his attention on areas of the subject most valuable to ...
2001-07-01
Cryocycling of energetic materials: Status report for FY94
Energy Technology Data Exchange (ETDEWEB)
The Cryocycling of Energetic Materials Project is sponsored by the Memorandum of Understanding (MOU) on advanced munition technologies. This MOU is an agreement between the Department of Energy and the Department of Defense (Office of Munitions) that facilitates the development of technologies of mutual interest to the two Departments. The cryocycling project is one of several that focus on demilitarization aspects of conventional weapons and weapon systems. During FY94 the project pursued the development of analytical and numerical models that can be used to describe and optimize the cryocycling process for preparing energetic materials for recycle and reuse. In addition, the demilitarization stockpile of the Department of Defense was analyzed to identify candidate munitions for the process, and pilot scale cryocycling operations were begun at an industrial contractor. When a material is cryocycled, it ...
1995-07-01
Cooperation of Russian and EU technical support organizations
International Nuclear Information System (INIS)
Since 1992, the fruitful collaboration of the Russian and Western-European technical support organizations (TSOs) is being continued due to the support of the European Commission. There are two main areas of activities. The first one is more of methodological assistance and enhancing RF TSOs capabilities to support Rostekhnadzor decision making process. Experience and knowledge acquired in this area projects increase RF TSOs capabilities regarding a wide spectrum of safety related issues assessment, in particular safety analyses, reactor vessel embrittlement, application of 'leak before break' concept, severe accident and accident management, fire risk evaluation, etc. The second area is focused on licensing related assessments of EC financed on site assistance projects (modernisations). This area projects promote implementation in Russia a licensing process based on a technical dialogue between ...
2007-08-01
Bundling harvester; Nippukorjausharvesteri
Energy Technology Data Exchange (ETDEWEB)
The staring point of the project was to design and construct, by taking the silvicultural point of view into account, a harvesting and processing system especially for energy-wood, containing manually driven bundling harvester, automatizing of the harvester, and automatized loading. The equipment forms an ideal method for entrepreneur`s-line harvesting. The target is to apply the system also for owner`s-line harvesting. The profitability of the system promotes the utilization of the system in both cases. The objectives of the project were: to construct a test equipment and prototypes for all the project stages, to carry out terrain and strain tests in order to examine the usability and durability, as well as the capacity of the machine, to test the applicability of the Eko-Log system in simultaneous harvesting of energy and pulp woods, and to start the marketing and manufacturing of the products. The basic problems of the ...
1996-12-31
Advanced Neutron Source (ANS) Project progress report, FY 1994
Energy Technology Data Exchange (ETDEWEB)
The President`s budget request for FY 1994 included a construction project for the Advanced Neutron Source (ANS). However, the budget that emerged from the Congress did not, and so activities during this reporting period were limited to continued research and development and to advanced conceptual design. A significant effort was devoted to a study, requested by the US Department of Energy (DOE) and led by Brookhaven National Laboratory, of the performance and cost impacts of reducing the uranium fuel enrichment below the baseline design value of 93%. The study also considered alternative core designs that might mitigate those impacts. The ANS Project proposed a modified core design, with three fuel elements instead of two, that would allow operation with only 50% enriched uranium and use existing fuel technology. The performance penalty would be 15--20% loss of thermal neutron flux; the flux would still just meet the ...
1995-01-01
A conceptual design study of superconducting proton linac for Neutron Science Project. 1
Energy Technology Data Exchange (ETDEWEB)
The Neutron Science Project at Japan Atomic Energy Research Institute has been proposed for the research of nuclear transmutation technology and the basic science with a spallation neutron source. The project calls for an 8MW proton linac which accelerates 5.3mA average current cw and pulsed beams up to 1.5GeV. The superconducting (SC) rf-cavity is the main option for the energy part from 100MeV to 1.5GeV because by using the SC structure, less power is consumed in cw operation than by using a normal conducting (NC) structure. A conceptual design study of the superconducting proton linac is reported. The SC linac is composed of 8 {beta} sections. Each section has the identical 5-cell cavities with the surface peak field of 16MV/m. The total number of cavities is 284, and the length of the SC linac is 690m. The lattice design is determined with the equipartitioned condition and the matched envelope equations for the minimum ...
1998-09-01
Advanced Network Security Project
... ADVANCED NETWORK SECURITY PROJECT Indiana University ... 4. TITLE AND SUBTITLE ADVANCED NETWORK SECURITY PROJECT ...
2005-12-01
EARLY ENTRANCE COPRODUCTION PLANT
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The ...
2004-01-12
Energy Technology Data Exchange (ETDEWEB)
The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been constructed to be a repository for transuranic (TRU) radioactive wastes generated from the US defense activities. In order to use WIPP as a repository for permanent disposal of TRU waste, the US Department of Energy (DOE) has to demonstrate compliance with the Standards for the Management and Disposal of Spent Nuclear Fuel, High Level and Transuranic Radioactive Wastes'' promulgated by the US Environmental Protection Agency (EPA) in the US Code of Federal Regulations 40 CFR Part 191. The DOE initially plans to perform experiments with a small quantity of waste at WIPP and would like to bring additional quantities for operational demonstration'', before determining whether WIPP is to be a repository for permanent disposal. There are serious problems in pursuing this course of action from an operational point of view. It would ...
1991-01-01
Safety assessment of South White Rose expansion project
Energy Technology Data Exchange (ETDEWEB)
Husky Oil Operations Ltd (Husky) is considering the development of the South White Rose Expansion (SWRX) area, located approximately 4 km south of the current Southern Glory Hole (SGH) in approximately 120 m of water. Within the new glory hole, one new drill centre will be constructed with wells tied back and into the SGH manifolds. The SWRX drill centre will comprise three horizontal production wells and two horizontal water injection wells with expansion capacity for eight wells. Husky is intending to submit a Development Plan Amendment to the Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB) as part of the development. This document presented the results of a study that assessed the potential impact of the new development on existing White Rose safety studies. The study reviewed existing safety studies that were developed for the White Rose project to determine the potential impact of the new SWRX development. These studies ...
2006-10-05
International Nuclear Information System (INIS)
The Belgian Tihange 2 nuclear power plant went into commercial operation in 1983 producing a thermal power of 2785 MW. Since the commissioning of the plant the steam generators U-tubes have been affected by primary stress corrosion cracking. In order to avoid further degradation of the performance and an increase in repair costs, Electrabel, the owner of the plant, decided in 1997 to replace the 3 steam generators. This decision was supported by the feasibility study performed by Tractebel Energy Engineering which demonstrated that an increase of 10% of the initial power together with a fuel cycle length of 18 months was achieved. Tractebel Energy Engineering was entrusted by Electrabel as the owner's engineer to manage the project. This paper presents the role of Tractebel Energy Engineering in this project and the safety analysis program necessary to justify the new operation point and the fuel cycle ...
2002-08-11
Energy Technology Data Exchange (ETDEWEB)
The hydro-generators suffer during its operative useful life a combination of stresses of nature thermal, electric, mechanics and environmental. With the time, they are going losing the capacity to support those stresses and the power plants suffer, more and more frequently, undesirable stops for repair services and maintenance. In function of the high costs incurred with these stopped, the operation of the power plant can be economically impracticable. That unavailability of the generation for the electric system, it results in reduction of the reliability, burdening the politics of load ruling. The re-potentiation is a proposal that seeks to extend the useful life of hydro-generators, at the same time that it try to rescue the reliability and the readiness of the plant, with larger power. The power increase is usually made possible, or for the surplus of the hydro resources in excess, or for the reduction of the losses of all the components ...
1996-07-01
Policy implications of funding DOE's K Reactor Cooling tower Project
Energy Technology Data Exchange (ETDEWEB)
This report has reviewed the construction of a cooling tower for the K reactor at the DOE Savannah River Site in Aiken, South Carolina. It has been found that the cooling tower would prevent further destruction of cypress and tupelo trees, would maintain a more consistent flow from site streams, and would allow earlier recovery of stream corridors inside a portion of the site. About 630 acres of wetlands have already been affected by the hot water discharged by the K reactor during the past 35 years. GAO believes that about 10 to 12 acres of additional damage would be prevented by the tower for every year the reactor is operated, and if current plans for re-start and retirement of the reactor are followed, less than 100 acres would be preserved. As requested, GAO also identified an example of a project that could be funded as compensation to the public for the damage the K reactor would do if Congress exempted it from the Clean Water Act and ...
1989-10-01
Energy Technology Data Exchange (ETDEWEB)
The paper is concerned with the economic operation of power systems comprising pumped storage and thermal plants. In power systems, pumped storage plants may receive the energy required for pumping water either from the system in which they are integrated or from a neighbouring system. Therefore, two mathematical formulations of the problem are presented depending on the source of energy during pumping. In both cases, the problem is reduced to a non linear optimization problem. Two numerical techniques are suggested for the solution of this optimization problem, namely the Lagrangian Multipliers technique and the Rosen Gradient Projection technique. Numerical examples are presented to demonstrate the techniques. Although the Lagrangian Multipliers technique has the advantage of being a well known technique, however, computer wise, the Rosen Gradient Projection technique proves to be more efficient. The results of the ...
1980-12-01
Novel Binders and Methods for Agglomeration of Ore
Energy Technology Data Exchange (ETDEWEB)
Many metal extraction operations, such as leaching of copper, leaching of precious metals, and reduction of metal oxides to metal in high-temperature furnaces, require agglomeration of ore to ensure that reactive liquids or gases are evenly distributed throughout the ore being processed. Agglomeration of ore into coarse, porous masses achieves this even distribution of fluids by preventing fine particles from migrating and clogging the spaces and channels between the larger ore particles. Binders are critically necessary to produce agglomerates that will not break down during processing. However, for many important metal extraction processes there are no binders known that will work satisfactorily at a reasonable cost. A primary example of this is copper heap leaching, where there are no binders currently encountered in this acidic environment process. As a result, operators of many facilities see a large loss of process efficiency due to their ...
2006-03-31
Magnetic liquefier for hydrogen
Energy Technology Data Exchange (ETDEWEB)
This document summarizes work done at the Astronautics Technology Center of the Astronautics Corporation of America (ACA) in Phase 1 of a four phase program leading to the development of a magnetic liquefier for hydrogen. The project involves the design, fabrication, installation, and operation of a hydrogen liquefier providing significantly reduced capital and operating costs, compared to present liquefiers. To achieve this goal, magnetic refrigeration, a recently developed, highly efficient refrigeration technology, will be used for the liquefaction process. Phase 1 project tasks included liquefier conceptual design and analysis, preliminary design of promising configurations, design selection, and detailed design of the selected design. Fabrication drawings and vendor specifications for the selected design were completed during detailed design. The design of a subscale, demonstration magnetic ...
1992-12-31
Improved primary water chemistry control of PWR plant in Japan
International Nuclear Information System (INIS)
Elevated pH operation to the pH value of 7.3 at 285degC is known to be effective for the reduction of radiation source in the primary water system of PWRs. A research project was started in 1989 and concluded in 1996 to study and verify the optimum pH and/or Li concentration from the viewpoint of radiation source reduction and materials integrity under improved water chemistry. This research project is sponsored by the Ministry of International Trade and Industries (MITI) in Japan and has two programs; high pH and high Li. The high Li program was conducted to establish the optimum Li concentration for the high boron concentration region (1100 - 1800 ppm) of the high burn up operation. In this paper, we shall discuss radiation source behavior under high pH conditions and PWSCC (Primary Water Stress Corrosion Cracking) susceptibility of materials with change of primary water chemistry conditions and the ...
1998-04-01
Hydrogen and natural gas buses in the USA. The cleanest machines ever built
Energy Technology Data Exchange (ETDEWEB)
In 1983, the first modern urban transit bus powered by an alternative transportation fuel took to the roads in the USA. A little more than a decade later, about 2.5% of all USA buses are powered by alternative transportation fuels and about 20% of the new bus orders for delivery by 1998 will be powered by alternative fuels, mostly by natural gas. There are over 2,200 natural gas buses in operation or on order, plus about 600 additional buses powered by other alternative fuels. When these orders are completed, alternative fuel buses will constitute over 4.4% of the urban bus fleet in the USA. The widespread use of natural gas buses in the USA provides an important transition pathway for hydrogen vehicles because of the similarities between distribution, refueling and onboard energy storage technologies for the two fuels. Projects demonstrating advanced hybrid-electric buses powered by natural gas or hydrogen and projects ...
1998-07-01
Energy Technology Data Exchange (ETDEWEB)
This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. ...
2006-07-01
Energy Technology Data Exchange (ETDEWEB)
The objective of this project was to develop a explosion suppression system capable to confine and extinguish gas explosions of the type produced in sub level caving faces when blasting to the coal pillar. Existing systems, such as triggered barriers, were considered not to be valid because of size, weight, cost, and other operational constraints. The research activities have been focused in the development of a mixed water/air spray system that should be manually activated some second before blasting. Two prototypes have been developed and tested, the first one using nozzle operating at the standard ranges of pressure that are normally available in underground coal mines, and a second one based in high-pressure nozzles. In this case, bottles containing a pressurized air/water mixtures are required. The works carried out included theoretical studies, hydraulic nozzles characterization, and modelling of the explosion ...
1999-11-01
Environmental strategy for energy: hydrogen fuel cell bus for Brazil
Energy Technology Data Exchange (ETDEWEB)
One of the most densely populated urban regions in the world is the Sao Paulo Metropolitan region (SPMR) in the State of Sao Paulo, Brazil. Air pollution is a real problem, mainly caused by vehicle exhaust fumes. The air pollution abatement measures adopted in the SPMR, such as the addition of ethanol to gasoline, the use of cars running on pure alcohol, the restrictions in the circulation of vehicles and the utilization of electronic fuel injection and catalyst have had a positive effect on the environment. The 25,000 buses and approximately 400,000 trucks, all operating on diesel, have not been affected by these measures, and it is believed that SPMR is the ideal location for testing new vehicular pollution reduction technologies. A project to this effect was launched by the Ministry of Mines and Energy in conjunction with a host of other partners, and it involved the operation of a fuel cell bus using hydrogen produced ...
2001-06-01
Device for removing drilling fines from a well head
Energy Technology Data Exchange (ETDEWEB)
The device for removing drilling fines from the well head includes a support disk encompassing the sucker rod of the drilling machine with frame made in the form of a dish with inner conical surface, and overturned truncated cone located in the dish of the support disk with the formation between them of a ring guide slit. In order to improve the effectiveness of removing the drilling fines and convenience of operation by excluding heavy manual auxiliary operations to clean the well head and to move the device from one well to another, it is equipped with a mechanism for suspension with a drive. The inner conical surface of the dish is equipped with slide blocks, while the overturned truncated cone is equipped with projections. The suspension mechanism is made in the form of a hydrocylinder and two pairs of levers connected in pairs by means of hinges. The hinges of each pair of levers are connected to the hydrocylinder, and ...
1982-01-01
International Nuclear Information System (INIS)
A high-performance power system (HIPPS) is being developed. This system is a coal-fired, combined-cycle plant that will have an efficiency of at least 47 percent, based on the higher heating value of the fuel. The original emissions goal of the project was for NOx and SOx to each be below 0.15 lb/MMBtu. In the Phase 2 RFP this emissions goal was reduced to 0.06 lb/MMBtu. The ultimate goal of HIPPS is to have an all-coal-fueled system, but initial versions of the system are allowed up to 35 percent heat input from natural gas. Foster Wheeler Development Corporation is currently leading a team effort with AlliedSignal, Bechtel, Foster Wheeler Energy Corporation, Research-Cottrell, TRW and Westinghouse. Previous work on the project was also done by General Electric. The HIPPS plant will use a high-Temperature Advanced Furnace (HITAF) to achieve combined-cycle operation with coal as the primary fuel. The HITAF is an ...
1995-07-12
Cybercars Past, Present and Future of the Technology
Automobile has become the dominant transport mode in the world in the last century. In order to meet a continuously growing demand for transport, one solution is to change the control approach for vehicle to full driving automation, which removes the driver from the control loop to improve efficiency and reduce accidents. Recent work shows that there are several realistic paths towards this deployment : driving assistance on passenger cars, automated commercial vehicles on dedicated infrastructures, and new forms of urban transport (car-sharing and cybercars). Cybercars have already been put into operation in Europe, and it seems that this approach could lead the way towards full automation on most urban, and later interurban infrastructures. The European project CyberCars has brought many improvements in the technology needed to operate cybercars over the last three years. A new, larger European ...
2005-01-01
Energy Technology Data Exchange (ETDEWEB)
This 4.5-year project consisted of routine analytical support to DOE`s direct liquefaction process development effort (the Base Program), and an extensive effort to develop, demonstate, and apply new analytical methods for the characterization of liquefaction process streams (the Participants Program). The objective of the Base Program was to support the on-going DOE direct coal liquefaction process development program. Feed, process, and product samples were used to assess process operations, product quality, and the effects of process variables, and to direct future testing. The primary objective of the Participants Program was to identify and demonstrate analytical methods for use in support of liquefaction process develpment, and in so doing, provide a bridge between process design, development, and operation and analytical chemistry. To achieve this direct coal liquefaction-derived materials. CONSOL made an evaluation ...
1994-05-01
API 5L X80M OD 34 inches cold bending
Energy Technology Data Exchange (ETDEWEB)
One of the main factors that require special attention in a pipeline construction is the cold bending process, once depending on the region that the line will be installed the number of bends may achieve 75%, as it was observed in some areas during Campinas-Rio pipeline construction. A study was carried out to evaluate the X80 cold bending operational parameters in order to make viable the use of high strength pipes in the construction of onshore pipelines. For this analysis three pipes of 34 inches x 0.750 inches had been cold bended, the operation was carried out using a hydraulic equipment with punches applications along the pipe, recording the correspondent angles related to the elastic and plastic deformations in order to assess the material spring-back. After the bending process, samples of the weld, extrados and intrados were subjected to mechanical and metallographic tests, as well as performed dimensional inspection of the pipes. It ...
2009-07-01
U. S. Department of Energy project book
Energy Technology Data Exchange (ETDEWEB)
This book covers representative projects in each program within the Department of Energy. The projects included were selected to provide an insight into the wide spectrum of projects authorized and under way in the Department. The projects described do not cover all projects authorized - they are merely representative. Descriptions, goals, and status are given for 29 energy projects, 4 scientific projects, and 5 defense projects. (RWR)
1980-01-01
CERN signed a Co-operation Agreement with the Government of Pakistan in 1994, which was followed in 1997 by a Protocol signed with the Pakistan Atomic Energy Commission (PAEC) concerning CMS magnet supports. CERN and PAEC then signed in 1998 a Memorandum of Understanding for collaboration in the construction of the CMS detector. The participation by Pakistani scientists and engineers in the CERN programme is channelled through the National Centre of Physics (NCP) established at the Quaid-i-Azzam University in Islamabad, under the terms of a 1999 Protocol to the 1994 Co-operation Agreement. The engineering and detector construction work performed under these Agreements has been of high quality, and the Pakistani participation is valued highly by the CMS collaboration. In continuation of this co-operation, Pakistan, represented by PAEC as funding agency, has now proposed to make in-kind contributions to the LHC ...
2003-01-01
Energy Technology Data Exchange (ETDEWEB)
The optimizing criterion is assumed to be the maximum net present value of the project. The following summarizes the significant conclusions. (1) Over a large range of discount rates, mining and milling of the mineral deposit at a constant cutoff grade and a constant production rate consistently results in smaller annual discounted cash flows than the optimal schedule determined by the dynamic programming model (dpm) where the cutoff grade and mining rate are allowed to vary in response to fluctuating product price. (2) With an increasing discount rate, under the dpm the annual discounted cash flows decrease at a slower rate than if the mineral inventory is mined and milled at a constant cutoff grade and a constant production rate. (3) Cuttoff grade increases only where higher equity ore is available. Thus, to maintain the mill feed requirement, the mining rate also increases. (4) Not withstanding an anamolous mineral deposit of high quality, the mining rate ...
1986-01-01
Liquid waste evaporator operating experience
Energy Technology Data Exchange (ETDEWEB)
Atomic Energy of Canada Limited (AECL) operates the Waste Treatment Centre (WTC) to treat and immobilize some of the low- level radioactive waste (LLRW) streams at the Chalk River Laboratories (CRL). The WTC at treats low- level radioactive liquid waste by removing the contaminants from the wastewater, concentrating them, and immobilizing them. The fundamental design concept for the WTC is to process the waste streams using forced circulation type liquid waste evaporation (LWE), to solidify the concentrates using thin film evaporator and to discharge the purified effluent into the Ottawa River following verification monitoring. The solidified product drums are stored in existing storage facilities in the CRL. The LWE was installed in the WTC to treat the LLRW. After about four (4) years of design, construction and cold commissioning, the active commissioning of the evaporator process using radioactive waste streams commenced in February 2000. The LWE has overcome ...
2006-07-01
Liquid waste evaporator operating experience
International Nuclear Information System (INIS)
Atomic Energy of Canada Limited (AECL) operates the Waste Treatment Centre (WTC) to treat and immobilize some of the low- level radioactive waste (LLRW) streams at the Chalk River Laboratories (CRL). The WTC at treats low- level radioactive liquid waste by removing the contaminants from the wastewater, concentrating them, and immobilizing them. The fundamental design concept for the WTC is to process the waste streams using forced circulation type liquid waste evaporation (LWE), to solidify the concentrates using thin film evaporator and to discharge the purified effluent into the Ottawa River following verification monitoring. The solidified product drums are stored in existing storage facilities in the CRL. The LWE was installed in the WTC to treat the LLRW. After about four (4) years of design, construction and cold commissioning, the active commissioning of the evaporator process using radioactive waste streams commenced in February 2000. The LWE has overcome ...
2005-05-08
Environmental management plan for the Jhario coalfield - India
Energy Technology Data Exchange (ETDEWEB)
An Environmental Management Plan (EMP) for the Jharia Coalfield (JCF) was recently completed as part of a World Bank funded project. The JCF, 260 km west of Calcutta, comprises 450 km{sup 2}. Bharat Coking Coal Limited (BCCL) operates an area of 258 km{sup 2}. Coal mining has been conducted for more than 100 years. There are severe constraints to mining due to geology, coal fires and the large population. BCCL counterpart staff participated actively in all aspects of the work. Air and water are heavily polluted, however, mining operations contribute only to a limited extent to the total pollution. Water contamination is generally due to inadequate sewage treatment and discharge from non-mine facilities such as power plants. The large area disturbed by mining to date will increase, as open pit mining operations are expected to expand significantly. Reclamation to date is generally confined to planting of ...
1997-12-31
Development of Nuclear Materials and Degradation Database
International Nuclear Information System (INIS)
There are about 440 operating nuclear power reactors in the world including 20 units from Korea. The average age of the reactors is more than 20 years and many of them are approaching to their original 30 or 40 years licensing terms. Even though some failures were reported in components or pipes of nuclear power plants (NPPs), these NPPs are considered to be too valuable to stop their operation at the end of design life. Therefore, the long-term operation of NPPs has become a worldwide trend based on technical and economic consideration. In order to ensure safe long-term operation of NPPs, it is increasingly necessary to adopt new approaches to deal with nuclear materials aging and degradation. Proactive Material Degradation Assessment (PMDA) is one of the key elements of these new approaches. Many kinds of background information such as materials and degradation history of components or piping in NPP ...
2010-10-01
Video equipment of tele dosimetry and audio
International Nuclear Information System (INIS)
To develop a work in an area with high radiation, it requires of a detailed knowledge of the surroundings work, a communication and effective vision, a near dosimetric control. In a work where the spaces variables and reduced accesses exist, noise that hinders the communication, defendant operative condition, radiation field and taking of decision, it is necessary to have tools that allow a total control of the environment to make opportune and effective decisions, there where the task is developed. Under this elementary concept, it was developed in the Laguna Verde Central a project that it allowed a mechanism, interactive of control in spaces complex; to see, to hear, to speak, to measure. This concept takes to the creation of an equipped system with closed circuit of television, wireless communication systems, tele dosimetry wireless systems, VHS and DVD recording equipment, uninterrupted energy units. The system requires of an electric ...
2007-07-01
Extending purchasing with document management, workflow and the internet
Energy Technology Data Exchange (ETDEWEB)
Sandia is a national security laboratory operated for the U.S. department of Energy by the Sandia Corporation, a Lockheed Martin Company. Sandia designs all non-nuclear components for the nation's nuclear weapons, performs a wide variety of energy research and development projects, and works on assignments that respond to national security threats - both military and economic. They encourage and seek partnerships with appropriate U.S. industry and government groups to collaborate on emerging technologies that support their mission. Today, Sandia has two primary facilities, one in Albuquerque, New Mexico, and one in Livermore, California. They employ about 7,600 people and manage about $1.4 billion of work per year. In 1995, a decision was made to move from their in-house developed systems to commercial software. This decision was driven partly by Y2K compliance issues associated with the existing operating system ...
2000-02-09
Use of robotics for radioactive waste shipping and receiving
International Nuclear Information System (INIS)
Radioactive waste shipping and receiving facilities presently planned for commercial and defence high level nuclear waste will handle waste packages at frequencies far in excess of those in common practice today. If current limits for radiation levels at the cask surface and current handling methods are used, high cumulative personnel exposure to ionizing radiation is projected to occur. To reduce these exposure levels, alternate handling methods are being developed and demonstrated. The production nature of cask receiving operations suggests commercial robotics be incorporated into a remote handling system to reduce predicted worker exposure to acceptable levels while maintaining or increasing throughput. The first phase of cask handling system development culminated in a proof-of-principle test demonstrating the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner. ...
1986-06-16
Use of robotics for radioactive waste shipping and receiving
International Nuclear Information System (INIS)
Radioactive waste shipping and receiving facilities presently planned for commercial and defense high-level nuclear waste will handle waste packages at frequencies far in excess of those in common practice today. If current limits for radiation levels at the cask surface and current handling methods are used, high cumulative personnel exposure to ionizing radiation is projected to occur. To reduce these exposure levels, alternate handling methods are being developed and demonstrated. The production nature of cask receiving operations, suggests commercial robotics be incorporated into a remote handling system to reduce predicted worker exposure to acceptable levels while maintaining or increasing throughput. The first phase of cask handling system development culminated in a proof-of-principle test demonstrating the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner.
1986-06-16
Use of commercial robotics in radioactive waste shipping and receiving
International Nuclear Information System (INIS)
Radioactive waste shipping and receiving facilities presently planned for commercial and defense nuclear waste will handle waste packages at frequencies far in excess of those in common practice today. Unacceptable personnel exposure to ionizing radiation is projected to occur if current limits for radiation levels at the cask surface and current handling methods are used. To reduce these exposure levels, alternate handling methods are being developed and demonstrated. The production nature of cask receiving operations suggests commercial robotics be incorporated into a remote handling system to reduce predicted worker exposure to acceptable levels, while maintaining or increasing throughput. The first phase of cask handling system development culminated in a proof-of-principle test demonstrating the feasibility of performing cask receiving and unloading operations in a remote and partially automated manner. 6 refs., 12 ...
1985-04-21
The Chernobyl plant shutdown; L'arret de la centrale de Tchernobyl
Energy Technology Data Exchange (ETDEWEB)
The Chernobylsk-1 reactor, operational in september 1977 has been stopped in november 1996; the Chernobylsk-2 reactor started in november 1978 is out of order since 1991 following a fire. The Chernobylsk-3 reactor began in 1981. During the last three years it occurs several maintenance operations that stop it. In june 2000, the Ukrainian authorities decided to stop it definitively on the 15. of december (2000). This file handles the subject. it is divided in four chapters: the first one gives the general context of the plant shutdown, the second chapter studies the supporting projects to stop definitively the nuclear plant, the third chapter treats the question of the sarcophagus, and the fourth and final chapter studies the consequences of the accident and the contaminated territories. (N.C.)
2000-12-01
The Bullhouse Project - Phase 2
Energy Technology Data Exchange (ETDEWEB)
The operation of the Bullhouse Minewater System, used to treat iron-rich minewaters discharged from long-abandoned coal mines, was studied to minimise pollution of the Upper Don river in the UK. Tests were carried out to determine optimal operating conditions. Ochre flocculation with polyacrylamide was efficient in batch tests as the ochre self-flocculated and sedimented in the lagoon without the need for chemical enhancement. The rate of accretion of the pipework in the system was modified by partial dewatering, reshaping and hardening of the deposits during ageing. Samples of ochre recovered from the drying beds and sump deposits were converted to ferric sulphate coagulant by dissolution with sulphuric acid and used with a polyelectrolyte to successfully purify reservoir water and pretreat wastewater. There was considerable local interest in the scheme with educational opportunities for schools and colleges.
2000-12-01
Stochastic analysis of productivity for a truck and shovel operation
Energy Technology Data Exchange (ETDEWEB)
Investment in mining projects is always associated with risk because of the inclusion of many uncertain parameters. Probability analysis can be applied to such a system which has many kinds of uncertain parameters. This kind of study uses historical data to provide more information for future decisions. This study uses the historical data from a truck-shovel operation at an open cut Coal Mine in NSW, Australia to develop a productivity estimation model, using stochastic analysis. In the first step statistics and various probability distributions were developed for both certain and uncertain variables. A correlation analysis was the next step to investigate any possible relationship between productivity and affecting parameters. The results of these two stages were then used in a simulation model using the stochastic approach. 2 figs.
1998-07-01
NAS battery demonstration at American Electric Power:a study for the DOE energy storage program.
Energy Technology Data Exchange (ETDEWEB)
The first U.S. demonstration of the NGK sodium/sulfur battery technology was launched in August 2002 when a prototype system was installed at a commercial office building in Gahanna, Ohio. American Electric Power served as the host utility that provided the office space and technical support throughout the project. The system was used to both reduce demand peaks (peak-shaving operation) and to mitigate grid power disturbances (power quality operation) at the demonstration site. This report documents the results of the demonstration, provides an economic analysis of a commercial sodium/sulfur battery energy storage system at a typical site, and describes a side-by-side demonstration of the capabilities of the sodium/sulfur battery system, a lead-acid battery system, and a flywheel-based energy storage system in a power quality application.
2006-03-01
Investigation of GPS/IMU Positioning System for Mining Equipment
Energy Technology Data Exchange (ETDEWEB)
The objective of this project is to investigate the applicability of a combined Global Positioning System and Inertial Measurement Unit (GPS/IMU) for information based displays on earthmoving machines and for automated earthmoving machines in the future. This technology has the potential of allowing an information-based product like Caterpillar's Computer Aided Earthmoving System (CAES) to operate in areas with satellite shading. Satellite shading is an issue in open pit mining because machines are routinely required to operate close to high walls, which reduces significantly the amount of the visible sky to the GPS antenna mounted on the machine. An inertial measurement unit is a product, which provides data for the calculation of position based on sensing accelerations and rotation rates of the machine's rigid body. When this information is coupled with GPS it results in a positioning system that can ...
2006-09-13
Household batteries: Evaluation of collection methods
Energy Technology Data Exchange (ETDEWEB)
While it is difficult to prove that a specific material is causing contamination in a landfill, tests have been conducted at waste-to-energy facilities that indicate that household batteries contribute significant amounts of heavy metals to both air emissions and ash residue. Hennepin County, MN, used a dual approach for developing and implementing a special household battery collection. Alternative collection methods were examined; test collections were conducted. The second phase examined operating and disposal policy issues. This report describes the results of the grant project, moving from a broad examination of the construction and content of batteries, to a description of the pilot collection programs, and ending with a discussion of variables affecting the cost and operation of a comprehensive battery collection program. Three out-of-state companies (PA, NY) were found that accept spent batteries; difficulties in ...
1992-01-01
Household batteries: Evaluation of collection methods
Energy Technology Data Exchange (ETDEWEB)
While it is difficult to prove that a specific material is causing contamination in a landfill, tests have been conducted at waste-to-energy facilities that indicate that household batteries contribute significant amounts of heavy metals to both air emissions and ash residue. Hennepin County, MN, used a dual approach for developing and implementing a special household battery collection. Alternative collection methods were examined; test collections were conducted. The second phase examined operating and disposal policy issues. This report describes the results of the grant project, moving from a broad examination of the construction and content of batteries, to a description of the pilot collection programs, and ending with a discussion of variables affecting the cost and operation of a comprehensive battery collection program. Three out-of-state companies (PA, NY) were found that accept spent batteries; difficulties in ...
1992-12-31
Energy Technology Data Exchange (ETDEWEB)
Cavity type receivers are used extensively in concentrating solar thermal energy collecting systems. The Solar Total Energy Project (STEP) in Shenandoah, Georgia is a large scale field test for the collection of solar thermal energy. The STEP experiment consists of a large field array of solar collectors used to supplement the process steam, cooling and other electrical power requirements of an adjacent knitwear manufacturing facility. The purpose of the tests, conducted for this study, was to isolate and quantify the radiative, conductive, and convective components of total heat loss, and to determine the effects of operating temperature, receiver angle, and aperture size on cavity heat loss. An analytical model for radiative heat loss was developed and compared with two other methods used to determine radiative heat loss. A proposed convective heat loss correlation, including effects of aperture size, receiver operating ...
1995-12-01
Gas turbine tops 40% efficiency; features novel inlet-air cooler
Energy Technology Data Exchange (ETDEWEB)
This article reports on the world's first gas turbine to top 40% thermal efficiency in simple cycle and is now operating commercially as part of a natural-gas-fired combined-cycle cogeneration (CC) plant serving the Ottawa Health Sciences Center, Ottawa, Ont, Canada. Owned and operated by TransAlta Energy Corp, Calgary, Alta, the CC plant supplies steam and hot and chilled water to the health center and another thermal user while the electricity is sold to Ontario Hydro. Part of the project included the conversion of 15-psig steam-carrying equipment to hot-water service. Commercial success of this installation heralds a new era in the application of efficient gas turbines for power generation.
1993-02-01
Free electron laser inertial thermonuclear synthesis
International Nuclear Information System (INIS)
The paper proposes a concept of power driver for industrial thermonuclear reactor based on inertial thermonuclear synthesis (ITS). The circuit is based on the application of free electron laser (FEL) as a energy source for thermonuclear target compression which becomes feasible due to the application of a radically new circuit of FEL-amplifier. In the project under consideration the FEL-based laser system operates on the wave length of 0.5 micrometer. The full energy of laser radiation equals 1 MJ. This energy is delivered to the target in the pulse whose length is controlled within the range of 0.1-2 ns. The laser system brightness is 4 x 10"2"2 W cm"-"2. The FEL operating pulse repetition frequency is 40 Hz, full efficiency of electricity conversion into the energy of optical radiation is 11%. 9 refs., 3 figs., 2 tabs.
Experimental study on display-control stereotype and development of human factors guidelines
Energy Technology Data Exchange (ETDEWEB)
It is very important to develop the design guidelines which can be applicable for Korean operators for the purpose of designing the KSNP more safely. The objective of this project is to provide the standards, guidelines and bases applicable for HF-010 through the within-subject experiment for obtaining Korean operators' population stereotype for direction-of-movement of controls associated with displays on the control panels. Through the survey of researches on display compatibility and the classification of types of displays and controls in the main control room of Uljin units 3 and 4, methods for an experiment on the stereotype were established. Experimental interface prototypes for a total of 108 combinations of display and control types were implemented. Experimental data collection and analysis system was built in association with the interface prototypes. The experiment was performed with participation of 250 ...
2003-01-01
Energy Technology Data Exchange (ETDEWEB)
Operation and maintenance cost estimating methodologies for advanced coal-fired atmospheric circulating fluidized-bed and advanced natural gas-fired combined cycle electric power plants are presented. The purpose of these cost estimating relationships is for use in long range planning and evaluation of the economics of use of these technologies for electric power generation. Projected annual costs of reference plants at ten different sites in the United States, one in each of the ten DOE regions, are given as of 1989, and comparisons are made with existing technologies. A listing of a computer program implementing the methodologies is included. 14 refs., 4 figs., 13 tabs.
1989-12-01
Energy from garbage tempts CPI firms. [Niagara Falls, New York
Energy Technology Data Exchange (ETDEWEB)
This article comments on the fact that there are only 17 energy-from-waste installations in operation in the U.S. and in this respect it lags behind other industrialized nations. Explanations for this gap include the relatively inexpensive garbage disposal as landfill, operating difficulties of some early plants and the high cost of building such facilities. There has been a recent push to build resource-recovery plants and it is believed that chemical companies will probably buy energy products from such plants. Hooker Chemical Co's new energy-from-waste plant at Niagra Falls, N.Y. is described, other companies involved in resource-recovery projects are mentioned, and it is hoped that more companies will invest in such plants.
1980-09-22
Cost and sensitivity analysis for uranium in situ leach mining. Open file report Oct 79-Mar 81
Energy Technology Data Exchange (ETDEWEB)
This report presents the results of an assessment of uranium in situ leach mining costs through the application of process engineering and discounted cash flow analysis procedures. A computerized costing technique was developed to facilitate rapid cost analyses. Applications of the cost model will generate mine life capital and operating costs as well as solve for economic production cost per pound U/sub 3/O/sub 8/. Conversely, rate of return may be determined subject to a known selling price. The data bases of the cost model were designed to reflect variations in Texas versus Wyoming site applications. The results of applying the model under numerous ore deposit, operating, well field, and extraction plant conditions for Texas and Wyoming are summarized in the report. Sensitivity analysis of changes in key project parameters have also been tested and are included.
1981-03-01
Corrosion results on alternative support materials from two model steam generator tests
International Nuclear Information System (INIS)
The objective of the C-E/EPRI project, ''Alternative Steam Generator Materials and Designs,'' was to evaluate the corrosion behavior of contemporary or alternative steam generator materials under prototypic design and secondary fault (high contaminant) water conditions. Two model steam generators built with various support materials and designs were tested under representative thermal and hydraulic conditions. One model operated under seawater faulted all-volatile treatment (AVT) secondary water chemistry conditions. The other model operated under acidified fresh water faulted AVT conditions. This presentation focuses on the tube support and tubesheet corrosion results obtained by destructive examination of both models.
1985-03-01
Chicken runs provide the fuel for Fibrowatt's global ambitions
Energy Technology Data Exchange (ETDEWEB)
This article reports on the operation of Fibrowatt's third chicken waste-fuelled power plant at Thetford in Norfolk, UK. Details are given of the plant which started operation in October 1998, the chicken litter fuel, the spiral screw fuel feeders, the Detroit Stoker grate and spreader stokers which ensure the fuel is burnt mid-air, the production of fertiliser from the ash, and fluegas emission control using cyclones, a baghouse and lime addition to neutralise acid gas. The economics of the project, and the support for the renewable electricity generation under the UK government's Non-Fossil Fuel Obligation are discussed. A site plan of the Thetford plant and a flow diagram of the process are provided.
2000-08-01
Architects and engineers guide to energy conservation in existing buildings
Energy Technology Data Exchange (ETDEWEB)
The manual enhances and simplifies the work of those architects and engineers whose practice includes the analysis and modification of existing buildings to reduce both fuel consumption and operating costs. A review of the principles of energy use and conservation is given. The manual also provides a step-by-step methodology for assessing and improving the year-round energy performance of buildings, as well as a series of forms, charts, and nomographs designed to serve as day-to-day tools in the energy professional's toolbox. After a cost-benefit analysis is prepared for each conservation opportunity, the owner will be able to implement decisions based on projected energy savings and calculate investment costs, operational changes, and payback periods. Each of these considerations is accorded a detailed treatment.
1980-02-01
Energy Technology Data Exchange (ETDEWEB)
The purpose of this project was to build a long-range, parallel hybrid gas/electric vehicle capable of driving beyond the communter capabilities of series hybrid vehicles. It was envisioned that since the gas engine would be able to independently propel the car when needed and that the electric motor would be capable of doing the same, then you have a very desirable situation where this car can operate much more cheaply on electricity for the short distance runs under approximately 60 miles and also be able to propel the vehicle via the gas engine on the long-distance trips. During the time the car would be operating in the gas engine mode, it would be also recharging the 16 deep cycle batteries via the electric motor now being used as a generator. Then, even on long-distance trips, the electric motor could be used, after having been fully or partially recharged, to even further reduce cost per mile.
1985-01-01
The reversed-field-pinch (RFP) fusion neutron source: A conceptual design
Energy Technology Data Exchange (ETDEWEB)
The conceptual design of an ohmically heated, reversed-field pinch (RFP) operating at /approximately/5-MW/m/sup 2/ steady-state DT fusion neutron wall loading and /approximately/124-MW total fusion power is presented. These results are useful in projecting the development of a cost effective, low input power (/approximately/206 MW) source of DT neutrons for large-volume (/approximately/10 m/sup 3/), high-fluence (3.4 MW yr/m/sup 2/) fusion nuclear materials and technology testing. 19 refs., 15 figs., 9 tabs.
1989-01-01
The 8{pi}LP Project: A 4{pi} light charged particle detection array at LNL
Energy Technology Data Exchange (ETDEWEB)
A 4{pi} detection system sensitive to light charged particles is being developed at the Laboratori Nazionali di Legnaro (LNL) for the study of reaction mechanisms at energies up to 20 AMeV. The array consists of 262 {Delta}E-E telescopes covering 90% of 4{pi}. Each telescope is made of a 300 {mu}m passivated silicon detector and a 15 mm (or 5 mm) CsI(Tl) crystal read by a photodiode. The system will be operational in the Spring of 1997 and the first experiments will run in the second half of 1997.
1996-12-31
Separation of variables for the quantum SL(2,R) spin chain
We construct representation of the Separated Variables (SoV) for the quantum SL(2,R) Heisenberg closed spin chain and obtain the integral representation for the eigenfunctions of the model. We calculate explicitly the Sklyanin measure defining the scalar product in the SoV representation and demonstrate that the language of Feynman diagrams is extremely useful in establishing various properties of the model. The kernel of the unitary transformation to the SoV representation is described by the same "pyramid diagram" as appeared before in the SoV representation for the SL(2,C) spin magnet. We argue that this kernel is given by the product of the Baxter Q-operators projected onto a special reference state.
2003-01-01
Savannah River Site Interim Waste Management Program Plan FY 1991--1992
Energy Technology Data Exchange (ETDEWEB)
The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.
1992-05-01
This report provides test results on the thermal performance of an Owens-Illinois Sunpak liquid, evacuated tube, solar collector under simulated conditions. The test was conducted using the Marshall Space Flight Center Solar Simulator in accordance with the test requirements specified in ASHRAE 93-77 (Method of Testing to Determine the Thermal Performance of Solar Collectors) and the procedures contained in MTCP-FA-SHAC-400 (Procedure for Operation of the MSFC Solar Simulator Facility). The tests were performed on a module used on the early demonstration projects. A current production module is undergoing tests with results to be in a subsequent report.
1979-10-10
International Nuclear Information System (INIS)
Current effort of the TAMA project is focused on establishment of the interferometer operation with a new vibration isolation system, called 'Seismic Attenuation System' (SAS). The SAS employs a multiple stage structure to realize soft spring for all of directions, as well as utilizes active control systems to stabilize mechanical resonances in the low frequency region below 1 Hz. The SASs were installed for four test masses, resulting in improvement of cavity length fluctuation below 150 Hz. We describe the structure of the SAS and its local active control system, and the status of the interferometer.
2008-07-01
Energy Technology Data Exchange (ETDEWEB)
This paper has the objective of presenting the philosophy of Static Var Compensator (SVC) Control as well the necessary adjustments in the project of control system to guarantee suitable performance under different operating conditions. The verification on the performance of the SVC control has been done by Transient Network Analyzer (TNA/CEPEL) studies, commissioning tests and a factory tests. The SVC is the type of Thyristor Controlled Reactor (TCR) and Thyristor Switched Capacitor (TSC). (author) 3 refs., 12 figs.
1994-12-31
NuMI proton beam diagnostics and control: achieving 2 megawatt capability
Energy Technology Data Exchange (ETDEWEB)
The NuMI proton beam at Fermilab currently delivers 120 GeV protons to the neutrino production target with design beam power capability to 400 kW. Upgrade capability to 700 kW is being prepared, with planning toward delivering 2.3 MW beam provided by the Project X accelerator upgrade plan. We report on the system of beam diagnostics and control used in operation of the NuMI beam. Also considered are the steps to provide a robust system for transport and targeting beam of 2 MW and beyond.
2008-10-01
Materials/manufacturing element of the Advanced Turbine Systems Program
Energy Technology Data Exchange (ETDEWEB)
The technology based portion of the Advanced Turbine Systems Program (ATS) contains several subelements which address generic technology issues for land-based gas-turbine systems. One subelement is the Materials/ Manufacturing Technology Program which is coordinated by DOE Oak Ridge Operations and Oak Ridge National Laboratory (ORNL). The work in this subelement is being performed predominantly by industry with assistance from universities and the national laboratories. Projects in this sub-element are aimed toward hastening the incorporation of new materials and components in gas turbines.
1995-12-31
Laboratory robotics projects in the Analytical Development Division at the Savannah River Laboratory
International Nuclear Information System (INIS)
To encourage the application of robotics technology for routine radiobench applications, a laboratory dedicated to the research and development of contained robotic systems is being constructed. The facility will have several robots located in laminar flow hoods, and the hoods are being designed to allow the possibility for multiple robots to work together. This paper presents both the design features of the hoods and the general layout of the laboratory, and also discusses an application of a robotic system for the routine nuclear counting of gamma tube samples. The gamma tube system is presently operating in one of the routine analysis laboratories. 5 figs.
How Waste Management Can Be Influenced By Transport Packagings
With major D&D projects ongoing or being planned, and also with the daily management of radwaste from nuclear facilities, the potential role of transport packagings has often been overlooked: here will one rely essentially on drums, there several local waste processing units are built, elsewhere decommissioned facilities are cut in small bits to fit into small containers by far less efficient. The present paper proposes to illustrate how integrating a transport system from the start may influence operational choices of waste management.
2002-02-28
Hideout return testing from support crevices
International Nuclear Information System (INIS)
The objectives of the project were to develop operational techniques for promoting contaminant hideout return from tube support crevices and to identify the effect of chemical inhibitor application on corrodent transport. The implementation of routine procedures for promoting the return of sequestered corrodents could retard the progression of denting or other corrosion processes and improve steam generator availability. Tests also quantified the effect of inhibitor application on crevice hideout and hideout return processes, with the intention of developing a better understanding of the inhibition mechanism. By carefully monitoring the hideout and hideout return inventories, the program also has provided the opportunity to study steam generator concentration processes in general.
1985-03-01
Energy Technology Data Exchange (ETDEWEB)
Economic depreciation of similar cost recovery schemes delay cash return of investment. Such delay may require new types of securities. Due to uncertainty of regulatory action and technology over the prolonged recovery life of the projects, investors may require a higher return, thereby raising the cost of capital. Utility managements might eschew long lived investment, too, even if cost effective to the consumer. Alternatives exist that would approximate the price signals of economic depreciation without discouraging investment. The importance of upfront returns to the investment process should not be minimized. 2 figs., 3 refs. (AV)
1985-03-01
Energy planning in developing countries: the role of microcomputers
Energy Technology Data Exchange (ETDEWEB)
Microcomputers are beginning to be used for energy analysis in many developing countries, and have the potential for making a significant contribution to the resolution of difficult analytical and data problems, and to improving communications between analyst and decision maker. Successful introduction of a microcomputer based on analytical capability, however, requires attention to several important factors in order to avoid the mistakes of the earlier mainframe computer era. This paper reviews the key issues of matching models to staff capabilities, of training, and of the operating environment, based on the author's first-hand experience with microcomputer projects in Uruguay, Haiti and Sri Lanka. 3 figures, 3 tables.
1985-02-01
Energy Technology Data Exchange (ETDEWEB)
The profitability of combustion turbines intended for export is of extreme importance for Electricite de France. It is principally during the development phase of a project that one can ensure resect of two indissociable factors, essential to the per-kWh production cost: global operating costs and performance in terms of reliability and availability. The approach proposed here advocates the global acquisition of the installation and its logistic support. Generally applicable recommendations are given. They enable integrating in the future plant specifications all requirements relative to plant reliability, availability, maintainability and logistic support. They are structured according to type: expression of needs and management factors. (orig.) 4 refs.
1998-12-31
Planning and management of change
Energy Technology Data Exchange (ETDEWEB)
The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, ...
1994-12-31
Energy Technology Data Exchange (ETDEWEB)
The Externally-Fired Combined Cycle (EFCC) is an attractive emerging technology for powering high efficiency combined gas and steam turbine cycles with coal or other ash bearing fuels. In the EFCC, the heat input to a gas turbine is supplied indirectly through a ceramic air heater. The air heater, along with an atmospheric coal combustor and ancillary equipment, replaces the conventional gas turbine combustor. A steam generator located downstream from the ceramic air heater and steam turbine cycle, along with an exhaust cleanup system, completes the combined cycle. A key element of the EFCC Development Program, the 25 MMBtu/h heat-input Kennebunk Test Facility (KTF), has recently begun operation. The KTF has been operating with natural gas and will begin operating with coal in early 1995. The US Department of Energy selected an EFCC repowering of the Pennsylvania Electric Company`s Warren Station for funding under the Clean ...
1995-06-01
Experience from Arctic projects : meeting the challenges of Arctic and harsh environment projects
Energy Technology Data Exchange (ETDEWEB)
The main businesses of the Aker Group were outlined. The Aker Group has an operating revenue of 51.7 billion with operational experience in deepwater floaters, subsea infrastructure, onshore oil and gas plants, fixed offshore platforms, petrochemical refining, power generation, pulping, and mining. The company plans and executes capital projects, provides technology solutions and life-cycle operations, service and maintenance. The Aker Group owns 50 per cent of the Aker Kvaener offshore drilling rig located in the North Sea. This presentation outlined the challenges of working in a harsh environment. The area is characterized by a short productive season, low temperatures and limited sunlight. The direct environmental issues include spills and the impact of oil and gas infrastructure. Indirect issues include lowering the entry barriers for other kinds of resource exploitation. Other challenges of field ...
2005-07-01
An overview of AECL's participation in the Korean Wolsung Tritium Removal Facility Project (WTRF)
International Nuclear Information System (INIS)
Full text: In heavy-water-moderated power reactors, tritium is primarily produced by neutron capture in deuterium nuclei in the moderator and coolant. For CANDU 6 reactors, the estimated steady-state values are #approx# 3 TBq#centre dot#kg"-"1 D_2O in the moderator and #approx# 74 GBq#centre dot#kg"-"1 D_2O in the coolant. Tritium removal is one option available to reactor operators for use in their heavy water and tritium management strategies. The WTRF is designed to remove tritium from tritiated heavy water in each of the four CANDU units at the Wolsung Site, to immobilize the tritium and to store it on site. The detritiation process is based on three steps: the first one (front-end) involves the transfer of tritium from heavy water to deuterium gas; the second one (enrichment) concentrates the tritium in a cryogenic distillation system to produce essentially pure D_2 and T_2 streams; and in the third step the tritium is packaged for long-term storage. The WTRF ...
2007-11-07
Shawnee flue gas desulfurization computer model users manual
Energy Technology Data Exchange (ETDEWEB)
In conjunction with the US Enviromental Protection Agency sponsored Shawnee test program, Bechtel National, Inc., and the Tennessee Valley Authority jointly developed a computer model capable of projecting preliminary design and economics for lime- and limestone-scrubbing flue gas desulfurization systems. The model is capable of projecting relative economics for spray tower, turbulent contact absorber, and venturi-spray tower scrubbing options. It may be used to project the effect on system design and economics of variations in required SO/sub 2/ removal, scrubber operating parameters (gas velocity, liquid-to-gas (L/G) ration, alkali stoichiometry, liquor hold time in slurry recirculation tanks), reheat temperature, and scrubber bypass. It may also be used to evaluate alternative waste disposal methods or additives (MgO or adipic acid) on costs for the selected process. Although the model is not ...
1985-03-01
ADVANCED CUTTINGS TRANSPORT STUDY
Energy Technology Data Exchange (ETDEWEB)
This is the third quarterly progress report for Year 3 of the ACTS Project. It includes a review of progress made in: (1) Flow Loop construction and development and (2) research tasks during the period of time between Jan. 1, 2002 and Mar. 31, 2002. This report presents a review of progress on the following specific tasks: (a) Design and development of an Advanced Cuttings Transport Facility (Task 3: Addition of a Cuttings Injection/Separation System), (b) Research project (Task 6): ''Study of Cuttings Transport with Foam Under LPAT Conditions (Joint Project with TUDRP)'', (c) Research project (Task 9b): ''Study of Foam Flow Behavior Under EPET Conditions'', (d) Research project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and Temperature ...
2002-04-30
Energy Technology Data Exchange (ETDEWEB)
The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design ...
2008-09-30
White Rose oilfield development application. CD-ROM ed.
Energy Technology Data Exchange (ETDEWEB)
Located approximately 350 km east of Newfoundland, on the eastern edge of the Jeanne d'Arc Basin, and approximately 50 km from both the Terra Nova and Hibernia oilfields, the White Rose oilfield is considered the main oil producing basin off the eastern coast of North America. Husky Oil is very active in the region and holds almost 32 per cent net working interest in the Significant Discovery License areas in the Jeanne d'Arc basin. The development of an economically significant oil discovery in the White Rose Significant Discovery Area is being proposed jointly by Husky Oil and Petro-Canada. It is estimated that the project would enable the recovery of an estimated 36 million cubic meters (230 million barrels) of recoverable oil in this area that covers approximately 40 square kilometers. The operators propose to use a ship-shaped floating production, storage and offloading (FPSO) facility which could store up to 135,000 ...
2001-01-01
C-106 tank process ventilation test
Energy Technology Data Exchange (ETDEWEB)
Project W-320 Acceptance Test Report for tank 241-C-106, 296-C-006 Ventilation System Acceptance Test Procedure (ATP) HNF-SD-W320-012, C-106 Tank Process Ventilation Test, was an in depth test of the 296-C-006 ventilation system and ventilation support systems required to perform the sluicing of tank C-106. Systems involved included electrical, instrumentation, chiller and HVAC. Tests began at component level, moved to loop level, up to system level and finally to an integrated systems level test. One criteria was to perform the test with the least amount of risk from a radioactive contamination potential stand point. To accomplish this a temporary configuration was designed that would simulate operation of the systems, without being connected directly to the waste tank air space. This was done by blanking off ducting to the tank and connecting temporary ducting and an inlet air filter and housing to the recirculation system. This configuration ...
1998-07-20
Energy Technology Data Exchange (ETDEWEB)
The Phase I feasibility study has focused on determining the availability of information for estimating exposures of the public to chemicals and radionuclides released as a result of historical operation of the facilities at the Oak Ridge Reservation (ORR). The estimation of such past exposures is frequently called dose reconstruction. The initial project tasks, Tasks 1 and 2 were designed to identify and collect information that documents the history of activities at the ORR that resulted in the release of contamination and to characterize the availability of data that could be used to estimate the magnitude of the contaminant releases or public exposures. A history of operations that are likely to have generated off-site releases has been documented as a result of Task 1 activities. The activities required to perform this task involved the extensive review of historical operation records and ...
1993-09-01
NATIONAL GEOSCIENCE DATA REPOSITORY SYSTEM PHASE III: IMPLEMENTATION AND OPERATION OF THE REPOSITORY
Energy Technology Data Exchange (ETDEWEB)
The NGDRS has facilitated 85% of cores, cuttings, and other data identified available for transfer to the public sector. Over 12 million linear feet of cores and cuttings, in addition to large numbers of paleontological samples and are now available for public use. To date, with industry contributions for program operations and data transfers, the NGDRS project has realized a 6.5 to 1 return on investment to Department of Energy funds. Large-scale transfers of seismic data have been evaluated, but based on the recommendation of the NGDRS steering committee, cores have been given priority because of the vast scale of the seismic data problem relative to the available funding. The rapidly changing industry conditions have required that the primary core and cuttings preservation strategy evolve as well. Additionally, the NGDRS clearinghouse is evaluating the viability of transferring seismic data covering the western shelf of the Florida Gulf ...
2002-10-01
NATIONAL GEOSCIENCE DATA REPOSITORY SYSTEM PHASE III: IMPLEMENTATION AND OPERATION OF THE REPOSITORY
Energy Technology Data Exchange (ETDEWEB)
The NGDRS has facilitated 85% of cores, cuttings, and other data identified available for transfer to the public sector. Over 12 million linear feet of cores and cuttings, in addition to large numbers of paleontological samples and are now available for public use. To date, with industry contributions for program operations and data transfers, the NGDRS project has realized a 6.5 to 1 return on investment to Department of Energy funds. Large-scale transfers of seismic data have been evaluated, but based on the recommendation of the NGDRS steering committee, cores have been given priority because of the vast scale of the seismic data problem relative to the available funding. The rapidly changing industry conditions have required that the primary core and cuttings preservation strategy evolve as well. Additionally, the NGDRS clearinghouse is evaluating the viability of transferring seismic data covering the western shelf of the Florida Gulf ...
2003-04-01
One of the NASA research activities was to identify, characterize, and simulate a series of technologies that could be used for hydrogen production at NASA Kennedy Space Center (KSC) using locally available sources. This project examined the production of hydrogen from solar energy. To produce hydrogen by water splitting, the operating voltage of conventional photovoltaic (PV) cells cannot supply the overvoltage required. Thus, the objective of this project was to research and develop photoelectrochemical (PEC) cells that can supply the required voltage for water splitting by constructing a multiple bandgap tandem PV cell and a photocatalyst that can be activated by infrared (IR) photons transmitted through the PV cell. The proposed concept is different from conventional PEC water splitting by using multiple band gap combinations. The advantages for this PEC cell concept is that the PV cells are not in contact with the ...
2009-01-01
Mine waste disposal and managements
Energy Technology Data Exchange (ETDEWEB)
Acid Rock Drainage (ARD) is the product formed by the atmospheric oxidation of the relatively common pyrite and pyrrhotite. Waste rock dumps and tailings containing sulfide mineral have been reported at toxic materials producing ARD. Mining in sulphide bearing rock is one of activity which may lead to generation and release of ARD. ARD has had some major detrimental affects on mining areas. The purpose of this study was carried out to develop disposal method for preventing contamination of water and soil environment by waste rocks dump and tailings, which could discharge the acid drainage with high level of metals. Scope of this study was as following: environmental impacts by mine wastes, geochemical characteristics such as metal speciation, acid potential and paste pH of mine wastes, interpretation of occurrence of ARD underneath tailings impoundment, analysis of slope stability of tailings dam etc. The following procedures were used as part of ARD evaluation and ...
1998-12-01
Flows for Floodplain Forests: A Successful Riparian Restoration
This peer-reviewed article from Bioscience journal is about restoring the Truckee river.Throughout the 20th century, the Truckee River that flows from Lake Tahoe into the Nevada desert was progressively dammed and dewatered, which led to the collapse of its aquatic and riparian ecosystems. The federal designation of the endemic cui-ui sucker (Chasmistes cujus) as endangered prompted a restoration program in the 1980s aimed at increasing spring flows to permit fish spawning. These flows did promote cui-ui reproduction, as well as an unanticipated benefit, the extensive seedling recruitment of Fremont cottonwood (Populus fremontii) and sandbar willow (Salix exigua). Recruitment was scattered in 1983 but extensive in 1987, when the hydrograph satisfied the riparian recruitment box model that had been developed for other rivers. That model was subsequently applied to develop flow prescriptions that were implemented from 1995 through 2000 and enabled further seedling ...
2003-07-01
External events analysis for the Savannah River Site K reactor
Energy Technology Data Exchange (ETDEWEB)
The probabilistic external events analysis performed for the Savannah River Site K-reactor PRA considered many different events which are generally perceived to be external'' to the reactor and its systems, such as fires, floods, seismic events, and transportation accidents (as well as many others). Events which have been shown to be significant contributors to risk include seismic events, tornados, a crane failure scenario, fires and dam failures. The total contribution to the core melt frequency from external initiators has been found to be 2.2 {times} 10{sup {minus}4} per year, from which seismic events are the major contributor (1.2 {times} 10{sup {minus}4} per year). Fire initiated events contribute 1.4 {times} 10{sup {minus}7} per year, tornados 5.8 {times} 10{sup {minus}7} per year, dam failures 1.5 {times} 10{sup {minus}6} per year and the crane failure scenario less than 10{sup {minus}4} per year to the core melt ...
1990-01-01
Energy Technology Data Exchange (ETDEWEB)
The distribution of lead in lactating mice and suckling offspring was studied with whole body autoradiography at 4 and 24 h after a single intravenous injection of {sup 203}Pb (50 mmol Pb/kg) to the dams. In the lactating mice on day 14 of lactation, the highest uptake of radioactivity at 4 h after administration was recorded in renal cortex, skeleton and liver. A high uptake was also evident in the mannary gland. At 24 h after administration, the radioactivity had decreased in most organs except in the skeleton. In the suckling pups, exposed to lead only via dams` milk for 24 h, the highest level of radioactivity was present in the intestinal mucosa and a much lower level of radioactivity was present in the skeleton. The mammary glands from mice given three daily intravenous injections of 240 {mu}mol Pb/kg were examined with X-ray microanalysis. At 4 h after the last injection, lead was found associated with casein micelles both inside the ...
1996-01-01
International Nuclear Information System (INIS)
The distribution of lead in lactating mice and suckling offspring was studied with whole body autoradiography at 4 and 24 h after a single intravenous injection of "2"0"3Pb (50 mmol Pb/kg) to the dams. In the lactating mice on day 14 of lactation, the highest uptake of radioactivity at 4 h after administration was recorded in renal cortex, skeleton and liver. A high uptake was also evident in the mannary gland. At 24 h after administration, the radioactivity had decreased in most organs except in the skeleton. In the suckling pups, exposed to lead only via dams' milk for 24 h, the highest level of radioactivity was present in the intestinal mucosa and a much lower level of radioactivity was present in the skeleton. The mammary glands from mice given three daily intravenous injections of 240 #mu#mol Pb/kg were examined with X-ray microanalysis. At 4 h after the last injection, lead was found associated with casein micelles both inside the ...
International Nuclear Information System (INIS)
In General Electric's design of the Simplified Boiling Water Reactor (SBWR), The depressurization valves (DPV) are installed in the reactor pressure boundary: four are connected to the reactor vessel by means of nozzles, and two more are located on the main steam pipes (one DPV for each line), which act during particular transients and/or loss of coolant accidents (LOCA), consequently providing the reactor vessel with a safe quick depressurization system. Once the vessel is de pressurised, the passive gravity-driven cooling system (GDCS) starts to operate, permitting the injection of water required for continuous core cooling. DPVs are leak tight, with welded flaps, actuated by a [striker[hammer***] which is activated by an explosive mixture. The dynamic loads that open these valves include, in addition to those produced by steam (typical in any thermodynamic transient with open/close valves), other important loads that are characteristic of this type of explosive ...
Regulatory review of reactor physics design aspects of TAPP-3 and 4
International Nuclear Information System (INIS)
Atomic Energy Regulatory Board carries out the regulatory review of the reactor physics design, commissioning and operational aspects through Project Design Safety Committee and Specialist Group of reactor physicists with wide experience in the design, commissioning and operational safety review of NPPs. TAPP-3 and 4 PHWRs, being the first indigenous design of 540 MWe Units, are quite different than the standard 220 MWe PHWRs. The safety review of reactor physics design was quite complex, as majority of the systems were new. The Reactor Physics Specialist Group carried out extensive safety review of 540 MWe PHWR reactor physics design and made significant contributions of design modifications and improvements in the operational procedures. Some salient contributions include: Monitoring the core during bulk addition of moderator without the availability of shutdown systems. Logics for providing safety ...
2006-11-13
Power system stabilizer application in a two unit plant analytical studies and field tests
Energy Technology Data Exchange (ETDEWEB)
The use of excitation system controls, specifically the Power System Stabilizer (PSS), to improve damping of power system oscillations and thus extend steady-state stability limits has been a subject of great interest in recent years. The desire to more fully utilize transmission capacity led to the installation of PSS controls on greater numbers of generating units to maintain stability margins. This paper addresses the tuning and adjustment of PSS controls in a two unit power plant. Both analytical studies and field test confirmations are presented. The practical difficulties of verifying the PSS control loop gain margin by testing are explored. A simplified procedure is outlined. The Lower Colorado River Authority (LCRA), Fayette Power Project (FPP) consists of two 683.7 MVA tandem compound steam turbine driven generators. The excitation systems are of the alternator rectifier type and the PSS control utilizes shaft speed as an input signal. The units must ...
1983-02-01
International Nuclear Information System (INIS)
The proceedings include the following lectures: Facing the challenges - new structures for electricity production. Renewable energies in Europe - chances and challenges. Nuclear outlook in the UK. Sustainable energy for Europe. Requirements of the market and the grid operator at the electricity production companies. Perspectives for the future energy production. Pumped storage plants - status and perspectives. Nuclear power/renewable energies -partners or opponents? New fossil fired power stations in Europe - status and perspectives. Nuclear energy: outlook for new build and lifetime extension in Europe. Biomass in the future European energy market - experiences for dong energy. Meeting the EU 20:20 renewable energy targets: the offshore challenges. DESERTEC: sustainable electricity for Europe, Middle East and North Africa. New power plants in Europe - a challenge for project and quality management. Consideration of safely in new build ...
2010-09-22
Operation of pressurized internally circulating fluidized bed boiler (PICFB) 4MWth hot model
Energy Technology Data Exchange (ETDEWEB)
In the atmospheric pressure coal combustion area, the Internally Circulating Fluidized Bed Boiler (ICFB) had already been proven to possess superior performance features in terms of the ease with which load conditions can be controlled and because of its low pollution level. Based on the particular merits of the ICFB furnace and the application of this technology to pressurized fluidized bed boiler technology, it was possible to achieve a pressurized fluidized bed boiler with superior ease of operation, reliability and low-pollution characteristics. From fiscal 1992, the authors have conducted extensive research work, including cold model tests and computer simulations to investigate the possibility of applying ICFB technology to the pressurized fluidized bed boiler technology in an attempt to develop the Pressurized Internally Circulating Fluidized Bed Boiler (PICFB). Based on the results achieved in this research, a hot-model design and fabrication ...
1997-12-01
Laboratory ageing of transformer oils
Energy Technology Data Exchange (ETDEWEB)
The insulating oil used in a transformer is a critical component, as its service life is typically 20 years with possibly little or no maintenance. Partial discharges (PD), thermal overloads and static discharges continually subject the oil to chemical deterioration during its operating life. To ensure equipment reliability during service, it is important that the initial quality of the new insulating oil should meet the required acceptance specifications and preferably be pre-tested before use. Accelerated aging tests have been devised to determine the life expectancy of oil in service by using forced air or oxygen flow into the oil, the presence of a copper catalyst, and at elevated temperatures. The more important standards relating to transformer application are discussed and highlights of the more important aspects of the oxidation chemistry of hydrocarbons are included. The ultimate aim of the project is the formulation of better standard ...
1996-04-01
Integrating the Integrators - A Roadmap to Success
Energy Technology Data Exchange (ETDEWEB)
The U.S. Department of Energy Environmental Management's (DOE-EM) investments in science and technology, as well as science and technology investments associated with other parts of the DOE are aimed at meeting the Departments cleanup goals. These investments, primarily focused on EM's cleanup mission, comprise the Environmental Quality Research and Development (R&D) portfolios. Synchronizing EM's Cleanup Project Managers (operations facility and process owners throughout the DOE complex) operational needs with EM R&D including the extensive work of the six Focus Areas (major thrust areas within DOE-EM) has been a continuing challenge. This recent initiative to better integrate the R&D program is in response to evolving needs within the Department to apply proven system engineering methods to clarify requirements and define EM's process to effectively orchestrate their R&D ...
1999-03-01
Innovative coke-oven repair techniques
Energy Technology Data Exchange (ETDEWEB)
Certain innovative coke-oven repair techniques are reviewed that represent an engineered approach to a successful rehabilitation of all types of coke-oven batteries. These techniques have been developed during the last 10 years and experience gained on a number of repair projects has shown that these techniques operate as a cohesive and comprehensive method of end flue and through-wall repairs to gain additional years of operating life to coke-oven batteries. Extended operations approaching 10 to 15 additional years of service at lower costs than a pad-up rebuild and, while meeting the environmental emission regulations, are attainable using the techniques of: Proper tie-in joint preparation; Improved bricking up methodology; Preheating refractory during bricking up; Installation of spring-loaded bracing system; and installation of flexible coke-oven doors. Repair methods that do not incorporate the ...
1995-10-01
Energy Technology Data Exchange (ETDEWEB)
The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication ...
1986-12-01
International Nuclear Information System (INIS)
Over the past few years, NPCIL has performed comprehensive Level-1 Probabilistic Safety Assessment (PSA) for a 220 MWe Pressurised Heavy Water Reactor (PHWR) at Kakrapar Atomic Power Station (KAPS) and for the first 540 MWe PHWR at Tarapur Atomic Power Project (TAPP- 3 and 4). The major objective of these PSAs was to present an integrated picture of the safety of the plant to identify and understand key plant vulnerabilities. As a result of the availability of these PSAs, there is a desire to use them to operate the plants in the most efficient manner practicable. In recent years, the operation of Indian Nuclear Power Plants has been characterized by improved availability/capacity factors and reduced forced outages. Frequency of planned outages is also being reduced. In order to achieve this, the PSAs are now being used as an engineering tool for optimization of Technical Specifications with regard to Allowed Outage Time ...
2005-12-01
Establishment of Database Program for In-service Test Management in Nuclear Power Plants
International Nuclear Information System (INIS)
In-service Test (IST) of the nuclear power plant is very important to maintain the safety of the plants. The safety features of nuclear power plant are based on the operation of pumps and valves. Therefore, it is an essential basis for the safety of nuclear power plant to keep operational readiness of pumps and valves. Because of the importance of the IST, most of nuclear power plants should designate the IST department and personnel. Because the nuclear power plants of Korea have several types and the designs and operations are different from each other, the methods and experiences are various for the management of the IST program. However, there are no medium to communicate with each other and exchange the tips and information about IST program and education and discussion would be required to apply a consistent code. The nature of the IST Standardization Management Data Base (SMDB) is to exchange opinions and documents ...
2010-10-01
Energy Technology Data Exchange (ETDEWEB)
The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army. After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just ...
1981-12-31
Design and implementation of the BESIII detector-control system
Energy Technology Data Exchange (ETDEWEB)
In the upgrade project of the Beijing Electron-Positron Collider (BEPCII), a novel Detector-Control System (DCS) for the Beijing Spectrometer (BESIII) has been built and started its successful operation for the BESIII Commissioning. The main task of the DCS is to monitor and control the status of the BESIII detector and to guarantee a safe operation of the detector. The DCS must provide a uniform and coherent interface to detector operators even though there are a large number of distributed I/O channels from a large variety of equipments. For this reason, the DCS is hierarchically organized and divided into three layers: front-end layer (FEL), local control layer (LCL) and global control layer (GCL). In the FEL, devices ranging from simple sensors up to complex computer-based devices like embedded systems and programmable logical controllers (PLC) are utilized. A LabVIEW-based software framework has ...
2008-07-21
Nuclear new-build - Status and Outlook from a German utility perspective
International Nuclear Information System (INIS)
Full text: As one of the Top 5 utilities in Europe, Rheinisch-Westfaelisches Elektrizitaetswerk AG, FWB: RW, RWE, operates a diversified generating capacity of about 45 GW; RWE Power alone generates over 30 GW. Besides a share of approximately 20% nuclear power, a large proportion of the generating base is in lignite and hard coal. RWE has an ambitious, Euro10 bn newbuild program of about 10 GW modern fossil fired plants and further expansion plans across Europe. By 2012, RWE intends to invest between Euro 15 and 20 bn outside Germany.The European Union has a challenging policy to increase the share of renewables, improve energy efficiency, and reduce greenhouse gases by 2020. At the same time, ageing power plants need to be replaced. This requires an enormous investment program across Europe. Nuclear power therefore, as a proven technology with low lifecycle carbon emissions and reasonable lifecycle cost, is a crucial contributor to achieve Europe's 2020 goals. ...
2009-10-12
DEVELOPMENT OF TECHNOLOGIES AND ANALYTICAL CAPABILITIES FOR VISION 21 ENERGY PLANTS
Energy Technology Data Exchange (ETDEWEB)
The training of a new project team member was completed (Task 2.1). The Software Requirements Document was written (Task 2.3). It was determined that the CAPE-OPEN interfaces are sufficient for the communication between Fluent and V21 Controller (Task 2.4). The AspenPlus-Fluent prototype on allyl/triacetone alcohol production was further developed to assist the GUI and software design tasks. The prototype was also used to analyze the sensitivity of a process simulation result with respect to a parameter in a CFD model embedded in the process simulation. Thus the integration of process simulation and CFD provides additional process insights and enables the engineer to optimize overall process performance (e.g., product purity and yield) with respect to important CFD design and operation parameters (e.g., CSTR shaft speed). A top-level design of the V21 Controller was developed and discussed. A draft version of the Software Design Document was ...
2001-07-10
International Nuclear Information System (INIS)
Results of an evaluation of 18 different products that can be used as waterstops in hydraulic dams to minimize or eliminate leaks at construction joints, were discussed. The materials were tested for permeability and adherence at 23, 15 and 5 degrees C. A two-component polyurethane resin product was found to be the one that best fulfilled the evaluation criteria. It was also found that the successful injection of a borehole depends not only on selecting the product with the best performance characteristics, but also on the technique used. Hence the preparation of the resin and the pressure at which it is injected are important performance criteria. 5 refs., 6 photos, 4 figs.
1997-09-22
International Nuclear Information System (INIS)
The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach of the Columbia River. The evaluation, in the fifth year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 2001 field season.
International Nuclear Information System (INIS)
The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the fourth year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 2000 field season.
International Nuclear Information System (INIS)
The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the third year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1999 field season.
International Nuclear Information System (INIS)
The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the second year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fish species, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1998 field season.
This report covers the first year of operation of a fuel cell power plant, installed by PPL Spectrum, Inc. (PPL) under contract with the United States Coast Guard (USCG), Research and Development Center (RDC). The fuel cell was installed at Air Station Cape Cod in Bourne, MA. The project had the support of the Massachusetts Technology Collaborative (MTC), the Department of Energy (DOE), and Keyspan Energy. PPL selected FuelCell Energy, Inc. (FCE) and its fuel cell model DFC{reg_sign}300 for the contract. Grant contributions were finalized and a contract between PPL and the USCG for the manufacture, installation, and first year's maintenance of the fuel cell was executed on September 24, 2001. As the prime contractor, PPL was responsible for all facets of the project. All the work was completed by PPL through various subcontracts, including the primary subcontract with FCE for the manufacture, delivery, and ...
2004-06-30
International Nuclear Information System (INIS)
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the ...
1999-05-01
Energy Technology Data Exchange (ETDEWEB)
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the ...
1995-05-01
Radon generation and transport in and around a gold mine tailings dam in South Africa
Energy Technology Data Exchange (ETDEWEB)
Naturally Occurring Radioactive Material (N.O.R.M.) occurs in most soil and rock, and by mining and mineral processing, some of the radionuclides are significantly enhanced. An in-situ gamma-ray detector called M.E.D.U.S.A., has been used to produce a map of relative activity concentrations in a gold mine tailings dam on the Witwatersrand in South Africa. A CsI(Na) scintillation detector is used in this system. M.E.D.U.S.A. spectra obtained from the survey were analyzed using the Full-Spectrum Analysis (F.S.A.) procedure to compute the {sup 40}K, {sup 238}U and {sup 232}Th activity concentrations. The activity concentrations are used with global positioning data (G.P.S.) to produce the concentration maps. A hyper-pure germanium gamma-ray detector (Hp Ge) was used to measure gamma-rays from the naturally occurring nuclides for soil samples taken at different points on the site to calibrate the M.E.D.U.S.A. system. Radon soil gas measurements were performed at ...
2006-07-01
Impaired neonatal survival of pro-opiomelanocortin null mutants.
Intercrosses of heterozygous pro-opiomelanocortin (POMC) mice result in homozygous null progeny at lower frequencies than expected. Genotyping offspring at pre-, peri-, and postnatal stages revealed that over half of homozygous null mutants die in the early postnatal stages. To investigate the reasons for this early postnatal lethality, we analyzed in detail different parameters in the initial hours after birth. POMC null mutants born to heterozygous dams presented at birth with corticosterone levels no different from wildtype littermates, were euglycemic, and had normal liver glycogen stores. However, already 30 min after birth corticosterone levels dropped by 80% and were undetectable thereafter, while corticosterone levels in wildtype animals increased during postnatal hours. Circulating adrenaline was almost below detection 1h after birth. Blood glucose levels fell sharply in all genotypes within 30 min after birth; however, wildtype and heterozygous pups ...
2010-12-22
Energy Technology Data Exchange (ETDEWEB)
A scaled physical model was operated to simulate steam drive operations in five-spot patterns with reservoir and operational parameters similar to those encountered in California reservoirs. The goal of this study was to elucidate the role of two important controllable parameters, viz., steam injection rate and steam quality and to explore the role of two important factors, oil viscosity and reservoir permeability on the performance of the steam drive. In addition, the influence of bottom water and a basal permeable layer were investigated. The experiments demonstrated that there is an optimum injection rate; that in the vicinity of this optimum an increased quantity results in improved oil steam ratios; that the viscosity of the oil at steam temperature, raised to a fractional power, 0.5, appears to correlate with oil production; that permeabilities in the darcy range have little effect on performance, but an increasing ...
1981-02-01
Facing the challenges of the nuclear renaissance
Energy Technology Data Exchange (ETDEWEB)
The Nuclear Renaissance is stumbling at the very same time it should speed up in order to help control the climate change and meet a fast growing energy need in a large part of the world. Rising costs of projects, uncertainties about their completion, rocketing safety requirements, and financial constraints are key factors which slow down the Nuclear Renaissance. Furthermore, the legal infrastructure required from any country to enter a commercial nuclear programme (safety authorities, fuel cycle, and waste disposal) is a major hurdle s which impedes consideration for small to mid size reactors, well suited for many countries. The paper prepared and presented by Alain Bugat (Chairman of NucAdvisor and former Head of the French Atomic Energy Commission), Dominique Vignon (CEO of NucAdvisor and former President and CEO of AREVA NP) and Michel Lecomte (Co-founder NucAdvisor) reviews the present status of the Nuclear Renaissance. Based on an analysis of initial versus ...
2010-07-01
Energy Technology Data Exchange (ETDEWEB)
This report covers the progress made on the title project for the project period. Four major areas of inquiry are being pursued. Advanced solid state NMR methods are being developed to assay the distribution of the various important functional groups that determine the reactivity of coals. Special attention is being paid to methods that are compatible with the very high magic angle sample spinning rates needed for operation at the high magnetic field strengths available today. Polarization inversion methods utilizing the difference in heat capacities of small groups of spins are particularly promising. Methods combining proton-proton spin diffusion with {sup 13}C CPMAS readout are being developed to determine the connectivity of functional groups in coals in a high sensitivity relay type of experiment. Additional work is aimed at delineating the role of methyl group rotation in the proton NMR relaxation behavior of coals.
1992-11-25
The Brazilian spherical detector: progress and plans
International Nuclear Information System (INIS)
We are building the Schenberg gravitational wave detector at the Physics Institute of University of Sao Paulo as programmed by the Brazilian Graviton Project. The antenna and its vibration isolation system are already built, and we have made a first cryogenic run for an overall test, in which we measured the antenna mechanical Q (figure of merit). We also have built a 10.21 GHz oscillator with phase noise performance better than -120 dBc at 3.2 kHz to pump an initial CuAl6% two-mode transducer. We plan to prepare this spherical antenna for a first operational run at 4.2 K with a single transducer and an initial target sensitivity of h #approx# 2 x 10"-"2"1 Hz"-"1"/"2 in a 50 Hz bandwidth around 3.2 kHz soon. Here we present details of this plan and some recent results of the development of this project.
2004-03-07
Energy Technology Data Exchange (ETDEWEB)
The structural acceptance criteria contained herein for the evaluation of existing underground double-shell waste storage tanks located at the Hanford Site is part of the Life Management/Aging Management Program of the Tank Waste Remediation System. The purpose of the overall life management program is to ensure that confinement of the waste is maintained over the required service life of the tanks. Characterization of the present condition of the tanks, understanding and characterization of potential degradation mechanisms, and development of tank structural acceptance criteria based on previous service and projected use are prerequisites to assessing tank integrity, to projecting the length of tank service, and to developing and applying prudent fixes or repairs. The criteria provided herein summarize the requirements for the analysis and structural qualification of the existing double-shell tanks for continued operation. ...
1995-09-01
Ship of challenges: Braced for perfect storms, icebergs and oilfield hazards
Energy Technology Data Exchange (ETDEWEB)
More details about the construction of the Terra Nova floating production, storage and offloading (FPSO) vessel are provided. The vessel was built in the Daewoo shipyard in South Korea, and is now undergoing final fitting at Bull Arm, near St. John's, Newfoundland. When complete, the vessel will operate 350 km offshore, southeast of St. John's. It is 291 metres long and 45.5 metres wide and has a capacity of 960,000 barrels of oil. Although the FPSO will hold less than half of the last giant supertanker which sailed for Irving Oil, it has a crew of 81, four times the size of the supertanker, reflecting the technical uniqueness of the vessel and the intense pre-occupation with safety associated with the combination of winds, ice, waves, and shallow water around the Grand Banks. Also described is the alliance system of partnership between the oil companies and the main contractors. The deal stipulates that if the project ran ...
2001-08-06
Energy Technology Data Exchange (ETDEWEB)
The use of deuterium-tritium fuel in the Compact Ignition Tokamak will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion devices auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. In-vessel remote maintenance included replacement of divertor and first wall hardware, faraday shields, and for an in-vessel inspection system. Provision for remote replacement of a vacuum vessel sector, toroidal field coil or poloidal field ring coil was not included in the project baseline. As a result of recent coil failures experienced at a number of facilities, the CIT project decided to reconsider the question of remote recovery from a coil failure and, in January of 1990, initiated a coil replacement study. This study focused on the ...
1990-01-01
Energy Technology Data Exchange (ETDEWEB)
The objective of the Hanford Environmental Dose Reconstruction Project (HEDR) is to estimate the potential radiation doses received by people living within the sphere of influence of the Hanford Site. A potential critical pathway for human radiation exposure is through the consumption of waterfowl that frequent onsite waste-water ponds or through eating of fish, shellfish, and waterfowl that reside in/on the Columbia River and its tributaries downstream of the reactors. This document summarizes information on fish, shellfish, and waterfowl radiation contamination for samples collected by Hanford monitoring personnel and offsite agencies for the period 1945 to 1972. Specific information includes the types of organisms sampled, the kinds of tissues and organs analyzed, the sampling locations, and the radionuclides reported. Some tissue concentrations are also included. We anticipate that these yearly summaries will be helpful to individuals and organizations ...
1992-07-01
Nuclear heating solutions. Realizations and projects
International Nuclear Information System (INIS)
Considering the present situation of thermal energy in Romania and having in view the fact that Romania is a Kyoto protocol signatory state one estimates that the development of the nuclear energy will have a promising growth. According with the statement of the National Energetic Observer, Romania became a net energy resource importer for the past 30 years and the estimations about the future are not optimistic. The finite reserves of fossil fuel (coal and natural gas), the gradual reduction of their share in the national energy balance with a tendency to become insignificant after 2025, as well as the present situation of the thermal power plants which are already beyond their operation life, all these indicate the nuclear energy as being the most reliable and sustainable future source for thermal energy production. Having in view these circumstances the paper aims at a short presentation of the existing nuclear solutions for district heating. Also, reviewed are ...
2009-10-12
Energy Technology Data Exchange (ETDEWEB)
Flow Tex and ABB Energiekabel GmbH have developed a technique which allows the recovery of cables without requiring any trenching works. The new technique was successfully used for the first time for a pilot project in 1995. The authors report on two recent recovery projects (1998) in which an optimised technology was used for recovering a total of 1 500 m system length of 110 kV low-pressure oil-filled cables in Stuttgart and Munich on very different conditions. The authors describe the operational experiences with the cable connections and highlight the background stipulating the removal of the cables. (orig.) [Deutsch] Ein Verfahren zur grabungsfreien Bergung von Kabeln, gemeinsam entwickelt von FlowTex und ABB Energiekabel, wurde erstmals in einem Pilotprojekt 1995 mit Erfolg eingesetzt. Die Verfasser berichten ueber zwei Bergungsprojekte, bei denen 1998 mit der optimierten Technik in Stuttgart und Muenchen insgesamt 1 ...
1999-03-22
Natural gas pipeline safety in residential areas served by master meters. a handbook
Prepared to make housing project managers, maintenance engineering staff, and designers and architects of HUD - assisted and HUD - insured housing projects and mobile home parks aware of their responsibilities under the Natural Gas Pipeline Safety Act, this handbook provides technical guidance for the reduction of gas leaks and the handling of gas leak incidents in residential areas. The hazards of natural gas, concern over gas safety in residential areas, applicable codes and standards, and sources of information and help are reviewed, along with maintenance and engineering considerations relating to gas pipe failures, the detection of gas leaks, appliance servicing, and pipe installation, repair, and replacement. Housing management considerations are also examined, with attention to recordkeeping and reporting, emergency contingency planning, tenant education, staff qualifications and training, and the development and use of a maintenance and ...
1975-04-01
Measurement of snow water storage in the Lake Saperior basin using aerial gamma-ray spectrometry
International Nuclear Information System (INIS)
A pilot project was started in 1977 over the Lake Superior basin to measure water storage on the land area using aerial gamma-ray spectrometry to provide hydrologic information for forecasting inflow to the lake. Two airborne surveys were made, respectively in November 1977 and March 1978 which provided estimates of the increase in snow water equivalent between these surveys. The basin is located on the Canadian Shield and consequently, the gamma radiation count rate is quite variable. The airborne results are compared with ground measurements on selected flight lines and show generally good agreement. Two equipment calibrations in the Ottawa area provided inconsistent parameter values which are consequently also reflected in the results over the Lake Superior basin. The project has demonstrated to-date that the technique can be developed into an operational system for measuring snow cover water equivalent of this vast and ...
1977-11-01
Joint Integration Office Independent Review Committee annual report, 1985
Energy Technology Data Exchange (ETDEWEB)
Comprised of seven persons with extensive experience in the issues of nuclear waste, the Independent Review Committee (IRC) provides independent and objective review of Defense Transuranic Waste Program (DTWP) activities managed by the Joint Integration Office (JIO), formerly the Defense Transuranic Waste Lead Organization (TLO). The Committee is ensured a broad, interdisciplinary perspective since its membership includes representatives from the fields of nuclear engineering, nuclear waste transportation, industrial quality control, systems and environmental engineering and state and local government. The scope of IRC activities includes overall review of specific TLO plans, projects and activities, and technical review of particular research and development projects. The Committee makes specific suggestions and recommendations based upon expertise in the field of TRU Waste Management. The IRC operates as a consulting ...
1986-08-01
Integration of advanced nuclear materials separation processes
Energy Technology Data Exchange (ETDEWEB)
This is the final report of a two-year, Laboratory Directed Research and Development (LDRD) project at the Los Alamos National Laboratory (LANL). This project has examined the fundamental chemistry of plutonium that affects the integration of hydrothermal technology into nuclear materials processing operations. Chemical reactions in high temperature water allow new avenues for waste treatment and radionuclide separation.Successful implementation of hydrothermal technology offers the potential to effective treat many types of radioactive waste, reduce the storage hazards and disposal costs, and minimize the generation of secondary waste streams. The focus has been on the chemistry of plutonium(VI) in solution with carbonate since these are expected to be important species in the effluent from hydrothermal oxidation of Pu-containing organic wastes. The authors investigated the structure, solubility, and stability of the key ...
1998-12-31
Energy Technology Data Exchange (ETDEWEB)
The primary objective of the project is to investigate the long-term effects of commercially available tangentially-fired low NO{sub x} combustion technologies on NOx emissions and boiler performance on Unit 2 at Gulf Power Company`s Plant Lansing Smith located near Lynn Haven, Florida. The project will characterize emissions and performance of a tangentially-fired boiler operating in the following configurations: Baseline ``as-found`` configuration: Phase 1; retrofitted low NO{sub x} concentric firing system (LNCFS) Level 2 and simulated low NO{sub x} bulk furnace staging (LNBFS): Phase 2; retrofitted low NO{sub x} concentric firing system (LNCFS) Level 3, Phase 3a and simulated LNCFS Level 1, Phase 3b.
1992-01-01
Energy Technology Data Exchange (ETDEWEB)
The primary objective of the project is to investigate the long-term effects of commercially available tangentially-fired low NO{sub x} combustion technologies on NOx emissions and boiler performance on Unit 2 at Gulf Power Company's Plant Lansing Smith located near Lynn Haven, Florida. The project will characterize emissions and performance of a tangentially-fired boiler operating in the following configurations: Baseline as-found'' configuration: Phase 1; retrofitted low NO{sub x} concentric firing system (LNCFS) Level 2 and simulated low NO{sub x} bulk furnace staging (LNBFS): Phase 2; retrofitted low NO{sub x} concentric firing system (LNCFS) Level 3, Phase 3a and simulated LNCFS Level 1, Phase 3b.
1992-01-01
Energy Technology Data Exchange (ETDEWEB)
The pilot project of the conversion of the green forage drying plant Lengenfeld to biomass firing could not be realized without problems. But the experience until now shows that it is in principle possible. The farmers involved are devoted to the project. For them the cultivation of biomass is an alternative to the abandonment of fields. The present low oil price sets limits to the positive income effect. The aim is an increase of the biomass share in heating energy supply to about 80%. (orig.) [Deutsch] Die Umstellung der Gruenfuttertrocknung Lengenfeld auf Biomassefeuerung ist als Pilotprojekt nicht ohne Probleme moeglich gewesen. Die bisherigen Erfahrungen zeigen jedoch die grundsaetzliche Praktikabilitaet. Die beteiligten Landwirte sind engagiert bei der Sache und schaetzen die Produktionsmoeglichkeit als Alternative zur Flaechenstillegung. Der derzeit niedrige Oelpreis setzt der positiven Einkommenswirkung jedoch enge Grenzen. Eine ...
1994-12-31
Energy Engineering Analysis Program Limited Energy Study, Fort Hunter-Liggett, California. Volume 1
The purpose of this study is to develop projects and actions that will reduce facilities energy consumption and operating costs at Fort Hunter Liggett. Implementation of these projects will contribute to achieving the goal of the Army Facilities Energy Plan of a reduction in energy consumption per square foot of building floor area of 20 percent by FY2OOO from FY1985 baseline levels, There are 205 numbered structures at Fort Hunter Liggett, containing a total of 791,034 square feet of gross floor space. This United Energy Study evaluates 52 surveyed buildings with results extended to an additional 44 identical or similar buildings. Together, these buildings contain a total of 632,386 gross square feet and account for approximately 93 percent of overall energy usage. Present Energy Consumption Total energy consumption at Fort Hunter Ligett in FY 1992 of non-transportation energy sources was 79,728 million Btu. This figure ...
1993-12-31
Development of a best estimate auditing code for CANDU thermal hydraulic safety analysis
Energy Technology Data Exchange (ETDEWEB)
The main purpose of this study is to develop a thermal hydraulic auditing code for the CANDU reactor, modifying the model of existing PWR auditing tool , i.e. RELAP5/MOD3. This scope of project is a fourth step of the whole project, applying the RELAP5/MOD3/CANDU+ version for the real CANDU plant LOCA Analysis and D2O leakage incident. There are three main models under investigation, i.e. Moody critical flow model, flow regime model of horizontal CANDU bundle, and fuel element heatup model when the stratification occurs, especially when CANDU LOCA is tested. Also, for Wolsung unit 1 D2O leakage incident analysis, the plant behavior is predicted with the newly developed version for the first 1000 seconds after onset of the incident, with the main interest aiming for system pressure, level control system, and thermal hydraulic transient behavior of the secondary system. The model applied for this particular application includes heat transfer ...
2001-03-01
Energy Technology Data Exchange (ETDEWEB)
A program is currently in progress at Argonne National Laboratory to evaluate and develop evaporator technology for concentrating radioactive waste streams. By concentrating radioactive waste streams, disposal costs can be significantly reduced. To effectively reduce the volume of waste, the evaporator must achieve high decontamination factors so that the distillate is sufficiently free of radioactive material. One technology that shows a great deal of potential for this application is being developed by LICON, Inc. In this program, Argonne plans to apply LICON`s evaporator designs to the processing of radioactive solutions. Concepts that need to be incorporated into the design of the evaporator include, criticality safety, remote operation and maintenance, and materials of construction. To design an effective process for concentrating waste streams, both solubility and vapor-liquid equilibrium data are needed. The key issue, however, is the high decontamination ...
1993-10-01
Corrosion of fluidized-bed boiler materials in synthetic flue gas
Energy Technology Data Exchange (ETDEWEB)
Candidate materials for components of a fluidized-bed waste heat recovery system (FBWHRS) include plain carbon steel, types 405 and 316 stainless steel, and alloy 800. These materials were exposed to synthetic flue gas at anticipated FBWHRS temperatures and higher for 3000 h to determine corrosion rates. The synthetic flue gas was a combustion atmosphere to which Cl/sub 2/ and HCl were added. The projected annual corrosion rate for plain carbon steel is about 0.08 mm/year (0.003 in./year) at 250 to 290/sup 0/C, but it would exceed 0.5 mm/year (0.02 in./year) at 560/sup 0/C. The projected annual corrosion rates of the other materials were less than 0.25 mm/year (0.01 in./year) at the maximum test temperatures of 560, 660, and 665/sup 0/C for type 405, type 316, and alloy 800, respectively. These results indicate that corrosion of candidate FBWHRS materials will not be significant at anticipated operating temperatures for ...
1983-11-01
Cooperative Research Centre for Mining Technology and Equipment (CMTE) annual report 1998/99
Energy Technology Data Exchange (ETDEWEB)
The Centre's new structure, implemented in July 1997 is now operating well. CMTE Development Limited is now the legal entity for the CRC and replaces the previously unincorporated joint venture. CMTE has ten core participating organisations. Roche Highwall Mining Pty. Ltd., withdrew participation during the year. The annual report describes its structure and management and various cooperative links. It outlines research programs in the following areas: mining; geological sensing; automation; reliability and maintenance; and coal processing. Projects include: developing an ultra-short-radius drilling machine for drainage of methane gas from coal seams; developing techniques for improved drilling speed and accuracy to reduce costs for gas drainage holes in underground coal mining; developing draglines; developing geophysical logging tools; developing autonomous control of underground vehicles such as coal-haul-dump (LHD) and haulage ...
1999-07-01
Counting is among the most fundamental operations in computing. For example, counting the pth frequency moment has been a very active area of research, in theoretical computer science, databases, and data mining. When p=1, the task (i.e., counting the sum) can be accomplished using a simple counter. Compressed Counting (CC) is proposed for efficiently computing the pth frequency moment of a data stream signal A_t, where 0= 0, which includes the strict Turnstile model as a special case. For natural data streams encountered in practice, this restriction is minor. The underly technique for CC is what we call skewed stable random projections, which captures the intuition that, when p=1 a simple counter suffices, and when p = 1+/\\Delta with small \\Delta, the sample complexity of a counter system should be low (continuously as a function of \\Delta). We show at small \\Delta the sample complexity (number of projections) k = ...
2008-01-01
Energy Technology Data Exchange (ETDEWEB)
The industrial standard process for the purification of natural gas is to remove acid gases, mainly hydrogen sulfide and carbon dioxide, by the absorption and reaction of these gases with alkanolamines. Inadequate data for vapor -- liquid equilibrium (VLE) hinder the industry from converting operations to more energy efficient amine mixtures and conserving energy. Some energy reductions have been realized in the past decade by applying such amine systems as ``hindered`` amines, methyldiethanolamine (MDEA), and MDEA based amine mixtures. However, the lack of reliable and accurate fundamental VLE data impedes the commercial application of these more efficient alkanolamine systems. The first project objective is to improve the accuracy of vapor -- liquid equilibrium measurements at low hydrogen sulfide concentrations. The second project objective is to measure the VLE for amine mixtures. By improving the accuracy of the VLE ...
1991-09-01
Energy Technology Data Exchange (ETDEWEB)
The industrial standard process for the purification of natural gas is to remove acid gases, mainly hydrogen sulfide and carbon dioxide, by the absorption and reaction of these gases with alkanolamines. Inadequate data for vapor -- liquid equilibrium (VLE) hinder the industry from converting operations to more energy efficient amine mixtures and conserving energy. Some energy reductions have been realized in the past decade by applying such amine systems as hindered'' amines, methyldiethanolamine (MDEA), and MDEA based amine mixtures. However, the lack of reliable and accurate fundamental VLE data impedes the commercial application of these more efficient alkanolamine systems. The first project objective is to improve the accuracy of vapor -- liquid equilibrium measurements at low hydrogen sulfide concentrations. The second project objective is to measure the VLE for amine mixtures. By improving the ...
1991-09-01
Chalk Point cooling tower project native vegetation study. Final report 1979
The Potomac Electric Power Company generating station at Chalk Point, MD, utilizes brackish water in its natural draft cooling tower and, consequently, releases saline aerosol into the atmosphere. A research and monitoring project was established in 1974 to evaluate the effects of this drift on native perennial vegetation. Leaf samples have been collected form dogwood, Cornys florida, Virginia pine, Pinus virginiana, black locust, Robinia pseudoacacia, and sassafras, Sassafras albidum, located at 12 different sites in the vicinity of the power plant. Sampling was begun prior to the operation of the cooling tower, 1974, and continued through 1978. Complete results from monthly monitoring of foliar chloride in the four native tree species is documented for May through September 1978. Results from salt spray experiments indicate chloride and sodium concentrations in the wood of dogwood trees increases with increased spraying levels.
1979-06-01
Energy Technology Data Exchange (ETDEWEB)
After an international ideas competition by TNC Switzerland and Germany in 1996, six companies where given the opportunity to construct a prototype of their newly developed integrated PV-sound barrier concepts. The main goal was to develop highly integrated concepts, allowing the reduction of PV sound barrier systems costs, as well as the demonstration of specific concepts for different noise situations. This project is strongly correlated with a German project. Three of the concepts of the competition are demonstrated along a highway near Munich, constructed in 1997. The three Swiss installations had to be constructed at different locations, reflecting three typical situations for sound barriers. The first Swiss installation was the world first Bi-facial PV-sound barrier. It was built on a highway bridge at Wallisellen-Aubrugg in 1997. The operational experience of the installation is positive. But due to the different ...
2002-07-01
Energy Technology Data Exchange (ETDEWEB)
The Mittelplate oilfield is located in the Waddensea tidelands 8 km off the north sea coast and represents Germany's largest oilfield. Since Mittelplate oil production has started in 1987, RWE Dea AG being the operator in a 50/50 joint venture with Wintershall AG, has continually implemented and improved the sophisticated technology required to exploit natural resources by using safe and environmentally compatible means in the sensitive tideland environment of Mittelplate. Besides the sucessful offshore operations from the man-made Mittelplate Drilling and Production Island, further onshore development has started in 2000 by producing from high-tech ERD wells drilled from onshore locations. The offshore oil production had been transported so far by specially designed tug and tow barges and had been restricted by weather and tide. To overcome this bottleneck and to enable an accelerated offshore drilling and production program a ...
2006-04-15
Operation experience with the 3 MW TRIGA Mark-II research reactor of Bangladesh
International Nuclear Information System (INIS)
The 3 MW TRIGA Mark-II research reactor of Bangladesh Atomic Energy Commission (BAEC) has been operating since September 14, 1986. The reactor is used for radioisotope production ("1"3"1I, "9"9"mTc, "4"6Sc), various R and D activities and manpower training. The reactor has been operated successfully since it's commissioning with the exception of a few reportable incidents. Of these, the decay tank leakage incident of 1997 is considered to be the most significant one. As a result of this incident, reactor operation at full power under forced-convection mode remained suspended for about 4 years. During that time, the reactor was operated at a power level of 250 kW so as to carry out experiments that require lower neutron flux. This was made possible by establishing a temporary by pass connection across the decay tank using local technology. The other incident was the contamination of the Dry Central ...
2004-09-15
The role of the NASA/DOD Aerospace Knowledge DIffusion Research Project in helping to maintain U.S.
1991-01-01
Energy Technology Data Exchange (ETDEWEB)
The present project examined the operating characteristics and application possibilities of a new, compact combined heating and electricity generating unit with a thermal output of 14,5 kW and a generating capacity of 5,5 kW. Such a module was installed in a plant in Arlesheim (Canton of Basel-Country) and subject to performance measurements. The small heating and generating plant is designed for cyclic operation (without heat storage) and is very compact and low in cost. The heating and generating unit conforms to all Swiss regulations relating to electrical installations and air pollution control. The NO{sub x} emissions of the unit (400 mg/m{sup 3} in steady state operation) are above the limits of LRV 92 (80 mg/m{sup 3}), but the regulation does not apply for units in this power range. The electricity generation costs are approximately CHF 0.16/kWh. It therefore makes sense to install the module in ...
1995-12-01
From Daya Bay to Ling Ao. The benefits of a duplication policy
International Nuclear Information System (INIS)
Over the past 15 years, the People's Republic of China has experienced very rapid economic growth of annual average 8%, which must be supported by fast expanding energy production, notably of electricity. China has the considerable amount of coal resources, but most of these resources are located in the north of the country, and the vast hydroelectric potential in Southwestern China is difficult to develop. Therefore, in the coastal provinces of Southeast China, where economic expansion is greatest, nuclear power has been chosen to meet the need. The Qinshan No. 1 PWR with 300 MWe output is the first Chinese nuclear power facility, and started the operation in 1992. Two 985 MWe PWRs have been operated since 1994 at Daya Bay. The construction of Qinshan No. 2 and 3 PWRs of 600 MWe each are in progress, and are expected to start the operation in 2001. These plants were designed by China based on the Framatome technology. Two ...
1996-10-01
Web 2.0 OLAP: From Data Cubes to Tag Clouds
Increasingly, business projects are ephemeral. New Business Intelligence tools must support ad-lib data sources and quick perusal. Meanwhile, tag clouds are a popular community-driven visualization technique. Hence, we investigate tag-cloud views with support for OLAP operations such as roll-ups, slices, dices, clustering, and drill-downs. As a case study, we implemented an application where users can upload data and immediately navigate through its ad hoc dimensions. To support social networking, views can be easily shared and embedded in other Web sites. Algorithmically, our tag-cloud views are approximate range top-k queries over spontaneous data cubes. We present experimental evidence that iceberg cuboids provide adequate online approximations. We benchmark several browser-oblivious tag-cloud layout optimizations.
2009-01-01
Waste Receiving and Processing Facility Module 2A: Advanced Conceptual Design Report. Volume 1
Energy Technology Data Exchange (ETDEWEB)
This ACDR was performed following completed of the Conceptual Design Report in July 1992; the work encompassed August 1992 to January 1994. Mission of the WRAP Module 2A facility is to receive, process, package, certify, and ship for permanent burial at the Hanford site disposal facilities the Category 1 and 3 contact handled low-level radioactive mixed wastes that are currently in retrievable storage at Hanford and are forecast to be generated over the next 30 years by Hanford, and waste to be shipped to Hanford from about DOE sites. This volume provides an introduction to the ACDR process and the scope of the task along with a project summary of the facility, treatment technologies, cost, and schedule. Major areas of departure from the CDR are highlighted. Descriptions of the facility layout and operations are included.
1994-03-01
The geometry of lie algebras and broken SO(6) symmetries
Non-linear realisations of the groups SU(2), SO(1,4) and SO(2,4) are analysed, described by the coset spaces SU(2)/U(1), SO(1,4)/SO(1,3) and SO(2,4)/SO(1,3) x SO(1,1). The Lie algebras of certain special unitary and special orthogonal groups are studied and their projection operators are determined in order to facilitate the above analyses, in particular that of SO(2,4)/SO(l,3) x SO(1,1). The analysis consists of determining the transformation properties of the Goldstone bosons, constructing the most general possible Lagrangian for the realisations and finding the metric of the coset space.
2001-01-01
The duke XUV FEL storage ring facility
Energy Technology Data Exchange (ETDEWEB)
In this paper we present status and developments of the Duke storage ring facility. The Duke storage ring facility provides the unique combination of phase-locked light sources ranging from high power OK-4 XUV FEL to quasimonochromatic {gamma}-ray beam and IR/X-ray spontaneous radiation. The XUV OK-4 FEL, which is collaborative project with BlNP, Novosibirsk, is in operation since November, 1996. The OK-4 UV FEL is also used for production of nearly monochromatic {gamma}-ray s with tunable energy. We present the results of UV lasing with the OK4 FEL and selected results of its applications. We will discuss our future plans for extension of this source and status of the construction of dedicated used facility adjacent to the FEL building. (author)
1998-11-01
The Terra Nova oil field development
Energy Technology Data Exchange (ETDEWEB)
Before expanding on the development of the Terra Nova oilfield, the author discussed the overall business strategy of Petro-Canada and identified where the Terra Nova and offshore Newfoundland oil have their place within this strategy. The principal basins and oilfields offshore Newfoundland were reviewed, then the emphasis shifted to rest on the Terra Nova development project. A whole range of topics were brought up, including the Floating Production, Storage and Offloading (FPSO) facility, the modules layout, the FPSO located at Bull Arm, and the floating production systems. The physical environment of the Grand Banks was highlighted, and the next few sections were devoted to the Terra Nova FPSO, FPSO and drill centres, the Turret General Arrangement, and Spider buoy including the disconnect/reconnect. The last four sections dealt with the animation of riser movement, the wellhead protection animation, Henry Goodrich, and operations ...
2001-07-01
Energy Technology Data Exchange (ETDEWEB)
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.
1999-02-01
Solar distillation as an appropriate technology tool in Haiti
Energy Technology Data Exchange (ETDEWEB)
Source Philippe (on the island of La Govave, near Haiti) is described in terms of climatic, sociological, agricultural and technical background. Because of drought conditions, it became necessary to develop a solar still to provide the town with sufficient fresh water. The still, which has been in operation since 1969, is described in some detail as is the construction process. Brackish and sea water are used to produce more than 1250 liters of fresh water each day. A windmill is used to pump the brackish water from a well to an elevated storage tank; it flows by gravity to solar still basins where it is vaporized, then condensed on a sloping glass surface and collected. Benefits of the solar still to the town's economy and health are discussed. Cost of the project was $17,000. 10 references. (MJJ)
1980-06-01
Scientific report 1997; Rapport scientifique 1997
Energy Technology Data Exchange (ETDEWEB)
In this book are found technical and scientific papers on the main works of the Direction of the Fuel Cycle (DCC) in France. The study fields are: the up-side of the nuclear fuel cycle with theoretical studies (plasma simulation) and technological developments and instrumentation (lasers diodes, carbides plasma projection, carbon 13 enrichment); the down-side nuclear fuel cycle with theoretical studies (ion Eu{sup 3+} complexation simulation, decay simulation, uranium and plutonium diffusion study, electrolyser operating simulation), scenario studies ( recycling, wastes management), experimental studies; dismantling and cleaning (soils cleaning, surface-active agent for decontamination, fault tree analysis); analysis with expert systems and mass spectrometry. (A.L.B.)
1998-07-01
SRS environmental technology development field test platform
Energy Technology Data Exchange (ETDEWEB)
A critical and difficult step in the development and implementation of new technologies for environmental monitoring and characterization is successfully transferring these technologies to industry and government users for routine assessment and compliance activities. The Environmental Sciences Section of the DOE Savannah River Technology Center provides a forum for developers, potential users, and regulatory organizations to evaluate new technologies in comparison with baseline technologies in a well characterized field test bed. The principal objective of this project is to conduct comprehensive, objective field tests of monitoring and characterization technologies that are not currently used in EPA standard methods and evaluate their performance during actual operating conditions against baseline methods. This paper provides an overview of the field test site and a description of some of the technologies demonstrated at the site including ...
1995-09-01
Energy Technology Data Exchange (ETDEWEB)
In this report we present an update on the results from the Amanda-B10 detector which operated in 1997 at depths of 1500 to 2000 meters in the deep Antarctic ice. The goal of Amanda project is to search for extra-terrestrial neutrinos. As a precursor to such a search we have studied atmospheric neutrinos which act as a calibration source for the detector. The observation of atmospheric neutrinos at a rate consistent with Monte-Carlo predictions establishes Amanda-B10 as a neutrino telescope. The Amanda-B10 data has been searched for evidence of several classes of neutrinos and for magnetic monopoles. Searches for a diffuse high energy neutrino flux and for neutrinos in coincidence with gamma-ray bursts have been conducted. Preliminary data analyses show no excess of neutrinos has been found. (A.C.)
2001-07-01
Regeneration of zinc anodes for the Electric Fuel{reg_sign} zinc-air refuelable EV battery system
Energy Technology Data Exchange (ETDEWEB)
The Electric Fuel Limited (EFL) refuelable zinc-air battery system is currently being tested in a number of electric vehicle demonstration projects, the largest of which is a field test of zinc-air postal vans sponsored chiefly by Deutsche Post AG (the German Post Office). The zinc-air battery is not recharged electrically, but rather is refueled through a series of mechanical and electrochemical steps that will require a special infrastructure in commercial application. As part of the German Post Office field test program, Electric Fuel designed and constructed a pilot zinc anode regeneration plant in Bremen, Germany. This plant is capable of servicing up to 100 commercial vans per week, which is adequate for the field test vehicle fleet. This paper will describe the design and operation of each of the areas and devices within the plant.
1997-12-31
International Nuclear Information System (INIS)
This report is the result of field work performed at the former White Point Nike Missile Site, San Pedro, California. The Hazardous Waste Remedial Actions Program tasked the Oak Ridge National Laboratory Pollutant Assessments Group in Grand Junction, Colo., with this project. The objective was to determine whether or not radioisotopes possibly associated with past Department of Defense (DOD) operations were present and within accepted background levels. The radiation survey was accomplished by performing three independent radiation surveys, both outdoors and indoors, and random soil sampling. Initially, the site was land surveyed to develop a grid block system. A background radiation investigation was performed out in the San Pedro area.
REBUILD AMERICA PROGRAM SCOPE OF WORK
Energy Technology Data Exchange (ETDEWEB)
This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.
2004-12-01
Energy Technology Data Exchange (ETDEWEB)
Itaipu Binacional has taken a decision of executing a technological updating for the energy measurement system through the substitution of the current system by other one equipped with digital devices. The main reasons for that were the following: a) The equipment in operation were of an outdated generation b) The accuracy class of the existing equipment was of 0.5%, but the tendency for invoicing measurements was to install meters with accuracy class of 0.2% in the enterprises c) The requirements of ONS/MAE, in Brazil, which establishes the minimum requisites to be attended by invoicing measurement systems.
2001-07-01
Participative risk management in the construction of onshore pipelines
Energy Technology Data Exchange (ETDEWEB)
This paper described a risk control management tool that has been developed by Petrobras Petroleo, the largest Brazilian oil company and one of the world's leading oil companies. The system covers health, safety and environmental (HSE) issues regarding pipeline construction projects. The limitations of traditional safety management systems for coping with the critical problems related to environmental safety issues were discussed. In particular, this paper described how the HSE tool evaluates the risks resulting from the following aspects of onshore pipeline construction and assembly: establishing right-of-way and route locations, transporting pipe, developing the construction site, opening the trench, pipe laying, pipe bending, concrete external coating, welding, external anticorrosive coatings, pipe placement backfilling, hydrostatic testing, maintenance operations, and pipeline commissioning. 6 refs., 1 tab.
2000-07-01
Optimizing the emissions and diesel replacement on a dual fuel, two stroke bus engine
Energy Technology Data Exchange (ETDEWEB)
Two natural gas/diesel dual fuel conversion systems for the Detroit Diesel 6V-71 transit bus engine were described. The basic concept of a dual fuel engine was to operate a diesel engine with both liquid fuel injection and a lean premixed gas mixture. The engine achieved high efficiency due to the high compression ratio typical of the diesel engine. Test results were obtained using three different calibrations on one engine. The objectives were to match existing engine performance with improved emissions and better overall fuel economics. Results showed that overall, engine conversion has both economic and emissions advantages over a straight diesel engine. However, the durability and in-use applicability of the system remains to be demonstrated with an in-bus demonstration project.. 3 tabs., 4 figs.
1995-12-31
OES receives permit for remediation of PCB contaminated soils
Energy Technology Data Exchange (ETDEWEB)
Ogden Environmental Services has announced that the Environmental Protection Agency (EPA) has issued a nation-wide federal permit allowing OES to use its circulating bed combustion (CBC) system for remediation of PCB contaminated soils. The landmark permit confirms the effectiveness of OES' CBC system and its ability to destroy PCBs without releasing harmful quantities of PCBs or other chemicals into the air. EPA headquarters issued the permit following their audit of trial burn operations of OES' CBC unit during September 1988 at the Arco Swanson River oil fields in the Kenai Wildlife Refuge, Kenai Peninsula, Alaska. The Arco project represents the world's first major remediation program using CBC technology and the largest PCB/soil cleanup to date.
1989-08-01
Energy Technology Data Exchange (ETDEWEB)
Counter-current regeneration of 2-stage sodium zeolite softeners has been employed in reducing hardness leakage level of steamflooding water to less than 1 ppm when raw water contains as much as 5,000 ppm of the total dissolved solids. Hardness leakage is caused by sodium displacement of calcium and magnesium from the bottom of the exchanger bed. This study presents nomographs providing for rapid calculations to be made, for which a convenient operational mode does not already exist. The nomographs relate the hardness leakage as a function of salt quality and influent water quality and present solutions for predicting the leakage level, salt quality requirement or the treatability of raw water required for steamflooding projects.
1982-08-01
Noise and vibration control offshore towards an improved design procedure
Energy Technology Data Exchange (ETDEWEB)
There is a clear incentive, therefore, for early consideration of the measures required to meet noise and vibration standards. The platform or rig owner and the operator are jointly responsible for agreeing a noise and vibration control policy and approach at the conceptual design stage, and for then passing on their requirements to the engineering design teams. The engineering design teams and acoustic and vibration specialists for their part need to use all their skill and judgement to apply that policy to the intensely complex job of designing and fabricating topsides facilities. With these concerns as background, UEG started, and has nearly completed, a two-phase study to provide detailed guidance to project managers and designers to assist them to develop appropriate policy and procedures and to help them put those procedures into practice. This paper describes the development of UEG's study, its application and benefits.
1983-09-01
Energy Technology Data Exchange (ETDEWEB)
Within the framework of the MINEO research project assisted by the European Union the Deutsche Steinkohle AG (DSK) has developed methods for the operational use of remote sensing data and geo-information systems for the regular observation, measurement and evaluation of environmental effects in mining areas. Only indirect environmental effects of the mining industry, which may result in particular from subsidence-induced changes in the hydrological situation (ground water level, drainage) and the resulting effects on the vegetation and land utilisation, can be observed for the DSK test area 'Kirchheller Heide' because of the underground mine workings. Hence the evaluations of the remote sensing data were concentrated on the development of methods to measure and analyse the vegetation condition and any changes. MINEO thus constitutes a module for the DSK environmental information system. (orig.)
2005-10-20
International Nuclear Information System (INIS)
In this project, measurement of x-ray radiation dose level during radiological examination in Jos university teaching hospital and Plateau State specialist hospital at different locations within the department were carried out using radiation survey meter. The results were converted from micro sievert per hour (#mu#Sv/hr) to milisievert per year (mSv/yr). The radiation levels from the two hospitals visited ranged from 1.3m Sv/yr to 8.4m Sv/yr. This implies that all the radiology departments visited are still operating within the safety limit having less than 20 mSv/yr which is the standard permissible radiation level recommended per year.
2008-10-15
Managing design and construction of the Central North Sea FPSO
Energy Technology Data Exchange (ETDEWEB)
Shell UK Exploration and Production, operating in the North Sea on behalf of Shell UK and Esso UK is presented developing the Teal and Guillemot fields in the Central North Sea (CNS). As part of this development it contracted with Single Buoy Moorings Inc., (SBM) for the design, supply and installation of a newbuilt floating Production Storage and Offloading (FPSO) vessel. The work is executed in close cooperation between Shell Expro (Client) and SBM (Contractor) and its main sub contractors. The system is due to be installed during the third quarter of 1996. After a short description of the field development and the FPSO vessel this paper outlines the contractual arrangements and the organization set-up to perform the work. A summary of the lessons learned (by SBM) is given. The opinions expressed in this paper are entirely that of the author and may not necessarily reflect the opinion of other parties involved in the CNS FPU project.
1996-12-31
Magnetic beam position monitor
Energy Technology Data Exchange (ETDEWEB)
Many nondestructive beam position monitors are known. However, these devices can not be used for DC particle beam diagnostics. We investigated a method of beam diagnostics applicable for the operative control of DC high power e-beam inside closed waveguide. A design of the detector for determination of{open_quote} center of mass {close_quote} position of DC particle beam was developed. It was shown that the monitor can be used as a nondestructive method for the beam position control in resonators. Magnetic field of the particle beam outside a resonator is used. The detector consists of the steel yokes and magnetic field sensors. The sensors measure magnetic fluxes in the steel yokes fixed outside the resonator. When the particle beam changes its position, these magnetic fluxes also change. Beam displacement sensitivity of the monitor depends on the steel yoke dimensions. The detector sensitivity is equal to 1 Gauss/mm for the conditions adequate to the FOM-FEM ...
1995-12-31
Los Alamos Advanced Free-Electron Laser
Energy Technology Data Exchange (ETDEWEB)
At Los Alamos, we are building a free-electron laser (FEL) for industrial, medical, and research applications. This FEL, which will incorporate many of the new technologies developed over the last decade, will be compact in size, robust, and user-friendly. Electrons produced by a photocathode will be accelerated to 20 MeV by a high-brightness accelerator and transported using permanent-magnet quadrupoles and dipoles. They will form an electron beam with an excellent instantaneous beam quality of 10 {pi} mm mrad in transverse emittance and 0.3% in energy spread at a peak current up to 300 A. Including operation at higher harmonics, the laser wavelength extends form 3.7 {mu}m to 0.4 {mu}m. In this paper, we will describe the project and the programs to date. 10 refs., 10 figs., 1 tab.
1991-01-01
Geothermal Energy R&D Program Annual Progress Report for Fiscal Year 1992
Energy Technology Data Exchange (ETDEWEB)
Geothermal budget actual amounts are shown for FY 1989 -1992, broken down by about 15 categories. Here, the main Program categories are: Exploration Technology, Drilling Technology, Reservoir Technology, Conversion Technology (power plants and materials), Industry-Coupled Drilling, Drilling Applications, Reservoir Engineering Applications, Direct Heat, Geopressured Wells Operation, and Hot Dry Rock Research. Here the title--Industry-Coupled Drilling--covered case studies of the Coso, CA, and Dixie Valley, NV, fields, and the Long Valley Exploratory Well (which had started as a magma energy exploration project, but reported here as a hydrothermal prospect evaluation well). (DJE 2005)
1993-07-01
Geomechanical numerical simulations of complex geologic structures
Energy Technology Data Exchange (ETDEWEB)
Ability to predict mechanical response of rock in three dimensions over the spatial and time scales of geologic interest would give the oil and gas industry the ability to reduce risk on prospects, improve pre-project initial reserve estimates, and lower operating costs. A program has recently been initiated, under the auspices of the Advanced Computational Technology Initiative (ACTI), to achieve such a computational technology breakthrough by adapting the unique advanced quasistatic finite element technology developed by Sandia to the mechanics applications important to exploration and production activities within the oil and gas industry. As a precursor to that program, in an effort to evaluate the feasibility of the approach, several complex geologic structures of interest were analyzed with the existing two-dimensional quasistatic finite element code, SANTOS, developed at Sandia. Examples are presented and discussed.
1996-05-01
Energy Technology Data Exchange (ETDEWEB)
A Final Environmental Impact Statement (FEIS) related to the licensing of Envirocare of Utah, Inc.`s proposed disposal facility in Tooele county, Utah (Docket No. 40-8989) for byproduct material as defined in Section 11e.(2) of the Atomic Energy Act, as amended, has been prepared by the Office of Nuclear Material Safety and Safeguards. This statement describes and evaluates the purpose of and need for the proposed action, the alternatives considered, and the environmental consequences of the proposed action. The NRC has concluded that the proposed action evaluated under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, is to permit the applicant to proceed with the project as described in this Statement.
1993-08-01
Energy Technology Data Exchange (ETDEWEB)
An economic evaluation is presented for the proposed plant for producing 11,414,000 gallons per year of fuel-grade alcohol from 150,000 tons of molasses. The project is economically attractive at a 1981 ethanol sales price of $2.00 per gallon, a 1981 molasses price of $85.00 per ton, and a plant capital investment of $27.45 MM. The evaluation description includes: investment, operating costs, revenues, and economic analysis. Included in appendices are detailed computer printouts for the following scenarios: the constant dollar, the uniform escalation, and the current dollar.
1981-05-01
Environmental planning for geothermal energy resource exploration, development, and utilization
Energy Technology Data Exchange (ETDEWEB)
The commercialization of geothermal energy resources consists of a sequence of exploration, development, and utilization activities. Each of these activities are beset by both generic and project specific technical, environmental, and institutional constraints which must be adequately resolved before geothermal operations can be conducted. This report presents a summary of selected environmental activities conducted during the early planning stages of geothermal resource commercialization. Three representative activities are elaborated upon. These include preliminary environmental planning for geothermal energy development in the Medicine Lake Highlands of California; potential alternatives for non-electric use of the geothermal resource at East Mesa in Imperial County, California; and site specific studies of the impacts from using East Mesa geothermal fluids to irrigate selected crops and indigenous climax vegetation.
1982-01-01
Encoal mild coal gasification project: Commercial plant feasibility study
Energy Technology Data Exchange (ETDEWEB)
In order to determine the viability of any Liquids from Coal (LFC) commercial venture, TEK-KOL and its partner, Mitsubishi Heavy Industries (MHI), have put together a technical and economic feasibility study for a commercial-size LFC Plant located at Zeigler Coal Holding Company`s North Rochelle Mine site. This resulting document, the ENCOAL Mild Coal Gasification Plant: Commercial Plant Feasibility Study, includes basic plant design, capital estimates, market assessment for coproducts, operating cost assessments, and overall financial evaluation for a generic Powder River Basin based plant. This document and format closely resembles a typical Phase II study as assembled by the TEK-KOL Partnership to evaluate potential sites for LFC commercial facilities around the world.
1997-07-01
During this reporting period the experimental apparatus was completed after substantial delays by the manufacturer. The equipment has been fully tested to familiarize the staff with its operating and safety procedures. An initial liquefaction study has begun on samples of Utah coal (60 microns or less) using 50 grams of iron-titanium alloy, 500 ml of tetralin, and 150 grams of powdered coal at 500/sup 0/F and 500 psig. Results will be available in the next quarterly report. A new researcher has been added to the project to address the hydrogen absorption of new and recycled alloy samples. 2 figs.
1985-03-28
Development of fluidized bed cement sintering technology
Energy Technology Data Exchange (ETDEWEB)
In the new system presented in this paper, the cement clinker is sintered, not in a rotary kiln, but in two different furnaces: a spouted bed kiln and a fluidized bed kiln. The heat generated in the process of cooling the cement clinker is recovered by a fluidized bed cooler and a packed bed cooler, which are more efficient than the conventional coolers. Compared with the rotary kiln system, the new technology significantly reduces NO{sub x} emissions, appreciably cuts energy consumption, and reduces CO{sub 2} emissions as well. Thus, the new system is an efficient cement sintering system that is friendly to the global environment. In this paper, we describe this new technology as one of the applied technologies at an industrial level that is being developed in the Clean Coal Technology Project, and we present the results from test operations at our pilot plant.
1994-12-31
International Nuclear Information System (INIS)
The objective of this project is to develop multi-dimensional computational models in order to improve the operation of uranium electrorefiners currently used in pyroprocessing technology. These 2-D (US) and 3-D (ROK) mathematical models are based on the fundamental physical and chemical properties of the electrorefiner processes. The validated models by compiled and evaluated experimental data could provide better information for developing advanced electrorefiners for uranium recovery. The research results in this period are as follows: - Successfully assessed a common computational platform for the modeling work and identify spatial characterization requirements. - Successfully developed a 3-D electro-fluid dynamic electrorefiner model. - Successfully validated and benchmarked the two multi-dimensional models with compiled experimental data sets
2008-08-01
Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.
1993-07-01
Collaborative OLAP with Tag Clouds: Web 2.0 OLAP Formalism and Experimental Evaluation
Increasingly, business projects are ephemeral. New Business Intelligence tools must support ad-lib data sources and quick perusal. Meanwhile, tag clouds are a popular community-driven visualization technique. Hence, we investigate tag-cloud views with support for OLAP operations such as roll-ups, slices, dices, clustering, and drill-downs. As a case study, we implemented an application where users can upload data and immediately navigate through its ad hoc dimensions. To support social networking, views can be easily shared and embedded in other Web sites. Algorithmically, our tag-cloud views are approximate range top-k queries over spontaneous data cubes. We present experimental evidence that iceberg cuboids provide adequate online approximations. We benchmark several browser-oblivious tag-cloud layout optimizations.
2007-01-01
Capturing the Daylight Dividend
Energy Technology Data Exchange (ETDEWEB)
Capturing the Daylight Dividend conducted activities to build market demand for daylight as a means of improving indoor environmental quality, overcoming technological barriers to effective daylighting, and informing and assisting state and regional market transformation and resource acquisition program implementation efforts. The program clarified the benefits of daylight by examining whole building systems energy interactions between windows, lighting, heating, and air conditioning in daylit buildings, and daylighting's effect on the human circadian system and productivity. The project undertook work to advance photosensors, dimming systems, and ballasts, and provided technical training in specifying and operating daylighting controls in buildings. Future daylighting work is recommended in metric development, technology development, testing, training, education, and outreach.
2006-04-30
Energy Technology Data Exchange (ETDEWEB)
This final report for the Swiss Federal Office of Energy (SFOE) reports on work done in the area of gasification of biomass. The use of dung, manure and sewage sludge as sources of energy is described and discussed. Hydrothermal gasification is proposed as an alternative to conventional gas-phase processes. The aim of the project in this respect is discussed. Here, a catalytic process that demonstrates the gasification of wet biomass to synthetic natural gas (SNG) in a continuously operating plant on a laboratory scale is being looked at. Difficulties encountered in preliminary tests are discussed. Long-term catalyst stability and the installations for the demonstration of the process are discussed, and gasification tests with ethanol are commented on.
2007-09-15
Application of nuclear energy for power generation at TAPS 3 and 4
International Nuclear Information System (INIS)
Tarapur Atomic Power Station, Unit 3 and 4 is located on the West Coast of the Arabian Sea near the existing Tarapur Atomic Power Station Unit 1 and 2. The nearest railway station is Boisar at a distance of 12 km from the site, which is on the main Western Railway Mumbai-Delhi route. The site is well connected by road and is about 30 Km from Mumbai-Ahmedabad National Highway-NH-8. The paper describes the land acquisition and rehabilitisation of the affected families, importance of project in the western grid, how it works, working principles of PHWR, principle of operation, major components/equipment, important systems, safety features, and waste management
2010-10-01
Aging measurements of a TMAE-based photon detector for the HERA-B RICH
We report on aging measurements of a photon detector candidate for the HERA-B RICH. The prototype, a proportional wire chamber operated with TMAE, was mounted on an argon filled test-beam RICH and was aged by UV light at rates we expect in HERA-B. We monitored gain and current continuously, and checked the chamber with Cherenkov photons at regular intervals. The number of detected photons/track (projected to 2.75 m C sub 4 F sub 1 sub 0 in HERA-B) dropped from 26 to 11 after two days of aging - well below the 20 required for pi/K separation. Based on these results, HERA-B decided to use multi-anode PMTs as photon detectors in the RICH.
1999-01-01
In the Advance Coal Liquefaction Concept Proposal (ACLCP) carbon monoxide (CO) and water have been proposed as the primary reagents in the pretreatment process. The main objective of this project is to develop a methodology for pretreating coal under mild conditions based on a combination of existing processes which have shown great promise in liquefaction, extraction and pyrolysis studies. The aim of this pretreatment process is to partially depolymerise the coal, eliminate oxygen and diminish the propensity for retograde reactions during subsequent liquefaction. The desirable outcome of the CO pretreatment step should be: (1) enhanced liquefaction activity and/or selectivity toward products of higher quality due to chemical modification of the coal structure; (2) cleaner downstream products; (3) overall improvement in operability and process economics.
1992-04-01
Advanced direct liquefaction concepts for PETC generic units
In the Advance Coal Liquefaction Concept Proposal (ACLCP) carbon monoxide (CO) and water have been proposed as the primary reagents in the pretreatment process. The main objective of this project is to develop a methodology for pretreating coal under mild conditions based on a combination of existing processes which have shown great promise in liquefaction, extraction and pyrolysis studies. The aim of this pretreatment process is to partially depolymerise the coal, eliminate oxygen and diminish the propensity for retograde reactions during subsequent liquefaction. The desirable outcome of the CO pretreatment step should be: (1) enhanced liquefaction activity and/or selectivity toward products of higher quality due to chemical modification of the coal structure; (2) cleaner downstream products; (3) overall improvement in operability and process economics.
1992-04-01
British Library Electronic Table of Contents (United Kingdom)
Action potentials from the brain control the activity of spinal neural networks to produce, by as yet unknown mechanisms, a variety of motor behaviors. Particularly lacking are details on how identified descending neurons integrate diverse sensory inputs to generate specific locomotor patterns. We have examined the operations of the principal neurons in an intriguing midbrain nucleus, the nucleus of the medial longitudinal fasciculus (nMLF), in the larval zebrafish. The nMLF is the most rostral grouping of neurons that projects from the brain well into the spinal cord of teleost fishes, yet there is little direct physiological data available regarding its function. We report here that a distinct set of large, individually-identifiable neurons in nMLF (the MeL and MeM neurons) are activated...
2010-01-01
Energy Technology Data Exchange (ETDEWEB)
Department of Foreign Affairs and International Trade services designed to assist businesses to effectively operate in global markets, were described. The goal of the Department is to give strategic targeted information that extends beyond export opportunities to include market access, investment, strategic alliances, technology transfer and competitiveness issues. These services constitute the Department`s Trade Commissioner Service, a network of 600 officers, deployed in 128 embassies and consulates worldwide to support Canadian business development initiatives across 16 sectors of the government`s International Trade Business Plan (ITBP). The Trade Commissioner Service programs include the WIN exporters database, a trade inquiries sourcing team, International Financial Institutions (IFI) projects, and the Program for Export Market Development (PEMD). A series of Sectoral Advisory Groups on International Trade (SAGIT) have been established to ...
1995-12-31
ASPEN simulation of environmental control processes: Final report
Energy Technology Data Exchange (ETDEWEB)
The United States Department of Energy (DOE) at the Morgantown Energy Technology Center (METC) contracted with P.S. Lowell and Co. Inc. (Lowell and Co.) and Jay S. Dweck, Consultant, Inc., (JSD) to enhance the capability of ASPEN in simulating coal gasification and oil shale processing plants. Of particular concern was the capability to predict the distribution of environmentally significant components among the various aqueous and organic liquids and gas streams within or leaving the process. The project was divided into major task areas. The first was to develop and implement the calculational routines necessary for predicting aqueous electrolyte chemical reactions. Part of this effort also was to select a species list and collect and/or regress data for the necessary parameters. The second task was to develop and implement a multi-phase flash capability (including precipitated solids) and unit operations models for a venturi and a ...
1988-04-01
A proposed linac cavity rf drive system for the Los Alamos extreme ultraviolet free-electron laser
Energy Technology Data Exchange (ETDEWEB)
Since 1979, scientists and engineers at the Los Alamos National Laboratory have designed, constructed, and operated a radio-frequency (RF) linac free-electron laser (FEL) at wavelengths from 9 to 45 /mu/m. Coupled with success of other research centers investigating wavelengths from the visible to far-infrared, Los Alamos is now proposing a vacuum-ultraviolet and soft x-ray (referred to henceforth as extreme ultraviolet, (XUV)) FEL oscillator/Self-Amplified Spontaneous Emission amplifier with beam energies ranging from 100 MeV to 1 GeV. This paper will focus on the first milestone of the proposed Los Alamos XUV project, i.e., a 250-MeV linac with approximately 50 mA of average current, producing photons with wavelengths below 1000 /angstrom/. 3 refs., 3 figs.
1989-01-01
A brief history of the PUREX and UO{sub 3} facilities
Energy Technology Data Exchange (ETDEWEB)
The Plutonium-Uranium Extraction (PUREX) Plant, conceived during the early Cold War years, was a vehicle to increase significantly US nuclear weapons production capacity. The original PUREX Plant was a concrete rectangle 1,005 feet long and 61.5 feet wide. The shielding capacity of the concrete was designed so that personnel in non-regulated service areas would not receive radiation in excess of 0.1 millirem per hour. This report discusses the design of the PUREX Plant, the production chronology, projects and equipment changes, equipment decontamination and reuse, waste management, and contamination events that have occurred during the operation of the plant. Additionally, the development and history of the Uranium Trioxide Plant are also covered.
1993-11-01
1983 Northern Australia mine rehabilitation workshop - papers presented
Energy Technology Data Exchange (ETDEWEB)
Papers presented at the workshop include: the longterm viability of mined land in Queensland; the determination and achievement of rehabilitation objectives: a state government objective; monitoring native vegetation in regenerated bauxite mines at Weipa: a belt transect method; rehabilitation strategies at the Collinsville open cut coal mine; the alteration of the environment by the construction and operation of the coal export facility at Abbot Point; some aspects of the premining environment at Collinsville; the prospects for long term revegetation of acid coal mine spoil and reject materials; recovery and stability in disturbed and artificially revegetated plant communities: a theoretical viewpoint; revegetation in the arid tropics: Mount Isa Mines' experience; Nabralek and its rehabilitation; rehabilitation and management strategies for acid mine wastes; the purpose and design of water quality monitoring networks at mine sites; Worsley alumina ...
1983-01-01
Energy Technology Data Exchange (ETDEWEB)
Theoretical and experimental data which have defined and/or extended the effectiveness of remote sensing operations are explored, with consideration given to both scientific and commercial activities. The remote sensing of soil moisture, the sea surface, and oil slicks is discussed, as are programs using satellites for studying geodynamics and geodesy, currents and waves, and coastal zones. NASA, Canadian, and Japanese radar and microwave passive and active systems are described, together with algorithms and techniques for image processing and classification. The SAR-580 project is outlined, and attention is devoted to satellite applications in investigations of the structure of the atmosphere, agriculture and land use, and geology. Design and performance features of various optical scanner, radar, and multispectral data processing systems and procedures are detailed.
1982-01-01
Status of steam generators in Spain
International Nuclear Information System (INIS)
There are a total of nine operational nuclear plants in Spain totalling 7.350 MWe. These units produced 54.265 x 106 KWh in 1990, 36% of the total generation in Spain. Seven of these plants are of the PWR type. The first plant in operation was Jose Cabrera (ZORITA) in 1968, one loop Westinghouse plant with a model 24 Steam Generator. Due to the design margin and careful operation of the Steam Generator of this plant its performance have been very good, with only 5% tubes plugged after 23 years of operation. This is one of the few units in the world that remains in phosphate chemistry. During the period 1981-1985 a total of four units, two in Almaraz and two in Asco entered in operation. These three loop s Westinghouse units use model D-3 preheater Steam Generators. The poor design and manufacture of the Steam Generators of these units have caused a large number of problems: ...
1991-09-16
Energy Technology Data Exchange (ETDEWEB)
The Tennessee Valley Authority (TVA), the Electric Power Research Institute (EPRI), and the Department of Energy-National Energy Technologies Laboratory (DOE-NETL) are evaluating and demonstrating integration of terrestrial carbon sequestration techniques at a coal-fired electric power plant through the use of Flue Gas Desulfurization (FGD) system gypsum as a soil amendment and mulch, and coal fly ash pond process water for periodic irrigation. From January to March 2002, the Project Team initiated the construction of a 40 ha Carbon Capture and Water Emissions Treatment System (CCWESTRS) near TVA's Paradise Fossil Plant on marginally reclaimed surface coal mine lands in Kentucky. The CCWESTRS is growing commercial grade trees and cover crops and is expected to sequester 1.5-2.0 MT/ha carbon per year over a 20-year period. The concept could be used to meet a portion of the timber industry's needs while simultaneously sequestering carbon in lands ...
2005-08-30
Fermilab Steering Group Report
Energy Technology Data Exchange (ETDEWEB)
The Fermilab Steering Group has developed a plan to keep U.S. accelerator-based particle physics on the pathway to discovery, both at the Terascale with the LHC and the ILC and in the domain of neutrinos and precision physics with a high-intensity accelerator. The plan puts discovering Terascale physics with the LHC and the ILC as Fermilab's highest priority. While supporting ILC development, the plan creates opportunities for exciting science at the intensity frontier. If the ILC remains near the Global Design Effort's technically driven timeline, Fermilab would continue neutrino science with the NOVA experiment, using the NuMI (Neutrinos at the Main Injector) proton plan, scheduled to begin operating in 2011. If ILC construction must wait somewhat longer, Fermilab's plan proposes SNuMI, an upgrade of NuMI to create a more powerful neutrino beam. If the ILC start is postponed significantly, a central feature of the proposed Fermilab plan ...
2007-01-01
Volatile Organic Compound Formation in Waste Composting Processes
Environmental Research Database
Objectives~%~ To quantify the volatile organic compound (VOC) emissions arising from the composting of a range of municipal and~%~ industrial wastes.~%~~%~ To relate the VOC emissions to the material being processed and the process conditions.~%~~%~ To confirm the findings of the above activites by monitoring full-scale composting operations.~%~~%~ To develop predictive models of VOC emissions in relation to waste feedstock and process conditions.~%~~%~ To produce guidance for plant designers, operators a [continued...]DescriptionA recent study of three composting plants undertaken for the Environment Agency has confirmed earlier work suggesting that waste composting can be a source of volatile organic compound (VOC) emissions. However, these experiments were restricted to garden and kitchen waste composting schemes and it was not possible to measure the effect that the ...
2005-01-30
International Nuclear Information System (INIS)
In the future even more than in the past, nuclear power will be indispensable in the present industrialized countries and in those still under development. The safe, nonpolluting, and economic supply of energy to mankind in the future includes so many different problems that the technology of the high-temperature reactor at its present level of development, and with the possibilities is offers above and beyond those provided by other, established, technologies, does not have to mark the end of some old line of development, but rather should be seen as the starting point of a development offering promise for the future. It is for this very reason that the extensive, valuable knowledge and experience accumulated in the construction, operation, and decommissioning of the AVR and THTR plants, the development of the HTR module and other variants and, last, but not least, the valuable results of projects such as PNP, NFE, and HHT, must be preserved ...
The B & W Owners` Group Generic License Renewal Program
Energy Technology Data Exchange (ETDEWEB)
Since the late 1970s, the Babcock & Wilcox (B & W) Owners Group (BWOG) has sponsored significant activities that address technical, economic, and licensing issues to ensure that the B & W nuclear steam supply system (NSSS) power plants operate until the end of their current plant licensed life and to preserve the license renewal option. It should be no surprise that the BWOG decided in late 1992 to aggressively pursue a license renewal effort. This effort, the Generic License Renewal Program (GLRP), has over the past 18 months contributed significantly to the industry`s license renewal initiative. The GLRP was established as a project with a full-time management organization within the BWOG structure. Its primary objective was the development and demonstration of an integrated plant assessment (IPA) process that would meet the requirements of the License Renewal Rule, published by the US Nuclear Regulatory Commission (NRC) in ...
1994-12-31
Energy Technology Data Exchange (ETDEWEB)
The Time Projection Chamber (TPC) magnet at LBL and its compensation solenoids are adiabatically stable superconducting solenoid magnets. The cryogenic system developed for the TPC magnet is discussed. This system uses forced two-phase tubular cooling with the two cryogens in the system. The liquid helium and liquid nitrogen are delivered through the cooled load by forced tubular flow. The only reservoirs of liquid cryogen exist in the control dewar (for liquid helium) and the conditioner dewar (for liquid nitrogen). The operation o these systems during virtually all phases of system operation are described. Photographs and diagrams of various system components are shown, and cryogenic system data are presented in the following sections: (1) heat leaks into the TPC coil package and the compensation solenoids; (2) heat leaks to various components of the TPC magnet cryogenics system besides the magnets and control dewar; (3) ...
1980-03-01
International Nuclear Information System (INIS)
Vertical U-tube steam generators in Pressurized Water Reactors (PWRs) operating an All Volatile Treatment (AVT) secondary chemistry have experienced corrosion problems, particularly denting and sludges. The studies reported evaluate the feasibility of using a low-concentration (0.5 wt%) chemical cleaning process to remove corrosion product deposits from steam generator surfaces and magnetite from tube-to-support plate crevices of PWR steam generators. The process potentially may be applied at schedule intervals, such as during normal refueling outages, to maintain a steam generator in clean operating condition. This report describes the results of testing to evaluate the effectiveness of several chelant acids for dissolving steam generator sludges and crevice magnetite. Corrosion of carbon steel by the chelant acids and the effects of various inhibitors are evaluated. The effectiveness of ion-exchange regeneration of several chelant-based ...
Restart of K-Reactor, Savannah River Site: Safety evaluation report
Energy Technology Data Exchange (ETDEWEB)
This Safety Evaluation Report (SER) focuses on those issues required to support the restart of the K-Reactor at the Savannah River Plant. This SER provides the safety criteria for restart and documents the results of the staff reviews of the DOE and operating contractor activities to meet these criteria. To develop the restart criteria for the issues discussed in this SER, the Savannah River Restart Office and Savannah River Special Projects Office staffs relied, when possible, on commercial industry codes and standards and on NRC requirements and guidelines for the commercial nuclear industry. However, because of the age and uniqueness of the Savannah River reactors, criteria for the commercial plants were not always applicable. In these cases, alternate criteria were developed. The restart criteria applicable to each of the issues are identified in the safety evaluations for each issue. The restart criteria identified in this report are ...
1991-04-01
Energy Technology Data Exchange (ETDEWEB)
This paper describes potentials on fuel economy and NO{sub x} exhaust emissions of a series hybrid urban bus system equipped with a ceramic gas turbine engine (CGT). The simulating program developed in-house was used to analyze influences of several parameters of each main components of the hybrid vehicle system on the performance of the bus running on the modified bus driving cycle. The basic data used in this analysis for a CGT was derived from the results of 'the Automotive 100kW CGT Project' of Japan. A dynamic response of a CGT-Generator rotating system was very much improved by introducing of 'Assisting system' in which the generator was used as an acceleration-deceleration assisting device when much acceleration or deceleration was needed. This system would make a CGT operate along the optimum operating line (fuel minimum line) even under the unsteady driving conditions. This ...
2000-03-20
International Nuclear Information System (INIS)
Reliability has an impact on wind energy project costs and benefits. Both life test data and field failure data can be used for reliability analysis. In wind energy industry, wind farm operators have greater interest in recording wind turbine operating data. However, field failure data may be tainted or incomplete, and therefore it needs a more general mathematical model and algorithms to solve the model. The aim of this paper is to provide a solution to this problem. A three-parameter Weibull failure rate function is discussed for wind turbines and the parameters are estimated by maximum likelihood and least squares. Two populations of German and Danish wind turbines are analyzed. The traditional Weibull failure rate function is also employed for comparison. Analysis shows that the three-parameter Weibull function can obtain more accuracy on reliability growth of wind turbines. This work will be helpful in the ...
2009-06-01
Operating PWR units in the USA have experienced very severe corrosion of the tube support plate at the crevice between the tube and the support. This results in distortion of the plate and crushing of the tube (denting). The first task of this project required that currently available computational methods to estimate the pH attained by concentrating boiler water under various fault conditions such as condenser leakage of river waters and faulty operation of condensate polishing plant. Particular attention has been paid to systems in which sulfate predominates. In the second task, the mechanisms are discussed by which solutions become concentrated in porous deposits on a boiling heat transfer surface. It is concluded that more experimental data are needed to test the validity of existing models. High solution concentrations in the deposit may occur at a heat flux close to the critical value for drying out the base of the ...
1984-01-01
Energy Technology Data Exchange (ETDEWEB)
The present study answers at the request of the Inspection of the classified installations to see the operator of the G.I.P. Cyceron setting up a plan of environmental radiological surveillance around its installations and including, at a minimal level, the following data: Measures of radioactivity on representative biological indicators and measures of dose rate in the environment close to installations in functioning. Further to the radiological assessment of the terrestrial environment of the G.I.P. Cyceron installations realized at the end of 2003, within the framework of a project of the installations extension, the A.C.R.O. was again required for the implementation of this radiological surveillance for year 2005. The first purpose is to supply elements of appreciation about the impact of these installations on environment and persons. This evaluation participates in radiation protection and allows to make sure that the G.I.P. ...
2007-07-01
Project reveals CO/sub 2/ confinement problems
Energy Technology Data Exchange (ETDEWEB)
The results of the liquid CO/sub 2/ injection pilots in the Granny's Creek field permit the following findings and conclusions: The pilots demonstrated that CO/sub 2/ can be used for tertiary recovery, and it will displace oil and form a high oil-cut bank in a watered-out reservoir. Oil production response in every case was almost immediate; and after CO/sub 2/ injection was stopped and water injection was started, the oil production declined rapidly over a period of 2-3 months to very low rates. Confinement of CO/sub 2/ to the pilot area was the principal problem. CO/sub 2/ spread rapidly to virtually all of the southern part of the reservoir of about 350 acres. Except for weather, there were practically no operational problems. Corrosion from the CO/sub 2/ was not observed. Pilot results did not demonstrate economic feasibility. The ratio of CO/sub 2/ to additional oil of 19,357 cu ft (14.696 psia and 60/sup 0/ F.) indicated the additional oil would not ...
1983-01-24
Materials considerations for the National Spallation Neutron Source target
Energy Technology Data Exchange (ETDEWEB)
The National Spallation Neutron Source (NSNS), in which neutrons are generated by bombarding a liquid mercury target with 1 GeV protons, will place extraordinary demands on materials performance. The target structural material will operate in an aggressive environment, subject to intense fluxes of high energy protons, neutrons, and other particles, while exposed to liquid mercury and to water. Components that require special consideration include the Hg liquid target container and protective shroud, beam windows, support structures, moderator containers, and beam tubes. In response to these demands a materials R and D program has been developed for the NSNS that includes: selection of materials; calculations of radiation damage; irradiations, post irradiation testing, and characterization; compatibility testing and characterization; design and implementation of a plan for monitoring of materials performance in service; and materials engineering and technical ...
1997-08-01
Long-term corrosion study at nuclear power plant Bohunice (Slovakia)
International Nuclear Information System (INIS)
Steam generators of four VVER-440 units at nuclear power plants V-1 and V-2 in Jaslovske Bohunice (Slovakia) were gradually changed by new original 'Bohunice' design in period 1994-1998. Corrosion processes before and after these design and material changes in Bohunice secondary circuit were studied using Moessbauer spectroscopy during last 25 years. Innovations in the feed water pipeline design as well as material composition improvements were evaluated positively. Moessbauer spectroscopy studies of phase composition of corrosion products were performed on real specimens scrapped from water pipelines or in form of filter deposits. The corrosion of new feed water pipelines system (from austenitic steel) in combination to innovated operation regimes goes dominantly to magnetite. The hematite presence is mostly on the internal surface of steam generator body and its concentration increases towards the top of the body. In the results interpretation it is necessary to ...
2010-03-01
Fuels and materials testing capabilities in Fast Flux Test Facility
Energy Technology Data Exchange (ETDEWEB)
The Fast Flux Test Facility (FFTF) reactor, which started operating in 1982, is a 400 MWt sodium-cooled fast neutron reactor located in Hanford, Washington State, and operated by Westinghouse Hanford Co. under contract with U.S. Department of Energy. The reactor has a wide variety of functions for irradiation tests and special tests, and its major purpose is the irradiation of fuel and material for liquid metal reactor, nuclear reactor and space reactor projects. The review first describes major technical specifications and current conditions of the FFTF reactor. Then the plan for irradiation testing is outlined focusing on general features, fuel pin/assembly irradiation tests, and absorber irradiation tests. Assemblies for special tests include the material open test assembly (MOTA), fuel open test assembly (FOTA), closed loop in-reactor assembly (CLIRA), and other special fuel assemblies. An interim examination and ...
1989-07-01
Fuels and materials testing capabilities in Fast Flux Test Facility
International Nuclear Information System (INIS)
The Fast Flux Test Facility (FFTF) reactor, which started operating in 1982, is a 400 MWt sodium-cooled fast neutron reactor located in Hanford, Washington State, and operated by Westinghouse Hanford Co. under contract with U.S. Department of Energy. The reactor has a wide variety of functions for irradiation tests and special tests, and its major purpose is the irradiation of fuel and material for liquid metal reactor, nuclear reactor and space reactor projects. The review first describes major technical specifications and current conditions of the FFTF reactor. Then the plan for irradiation testing is outlined focusing on general features, fuel pin/assembly irradiation tests, and absorber irradiation tests. Assemblies for special tests include the material open test assembly (MOTA), fuel open test assembly (FOTA), closed loop in-reactor assembly (CLIRA), and other special fuel assemblies. An interim examination and ...
Experimental control of a cupola furnace
Energy Technology Data Exchange (ETDEWEB)
In this paper the authors present some final results from a research project focused on introducing automatic control to the operation of cupola iron furnaces. The main aim of this research is to improve the operational efficiency and performance of the cupola furnace, an important foundry process used to melt iron. Previous papers have described the development of appropriate control system architectures for the cupola. In this paper experimental data is used to calibrate the model, which is taken as a first-order multivariable system with time delay. Then relative gain analysis is used to select loop pairings to be used in a multiloop controller. The resulting controller pairs melt rate with blast volume, iron temperature with oxygen addition, and carbon composition with metal-to-coke ratio. Special (nonlinear) filters are used to compute melt rate from actual scale readings of the amount of iron produced and to smooth ...
1998-08-01
Energy Technology Data Exchange (ETDEWEB)
Within the framework of the German Federal-State 1000 Roofs Photovoltaic Programme monthly measuring data and verbal comments on the PV system operation (reports on failures and defects) have been collected, stored in a databank and evaluated for the period 1991 to 1997 for a differing number of PV systems. In addition to this came along data of initially 100, then 40 intensively measured systems. The results of the measuring data evaluation as well as the results of further accompanying research projects to the Federal-State 1000 Roofs Photovoltaic Programme (e.g. low energy yield analysis, on-site inspections and measuring of nominal powers) are summarised. Starting from the gained results, conclusions and recommendations are given for the design, installation and operation for future grid-connected PV-systems. Also it is pointed to the remaining need for optimisation and R and D. Additional part of the report are the ...
1998-10-16
International Nuclear Information System (INIS)
Elise is a heavy ion induction linear accelerator that will demonstrate beam manipulations required in a driver for inertial fusion energy. With a line charge density similar to that of heavy ion drivers, Elise will accelerate a #>=# 1 gs beam pulse of K"+ ions from an initial energy of 2 MeV to a final energy #>=# 5 MeV. In the present design, the Elise electrostatic quadrupoles (ESQ) will have a 2.33 cm radius aperture operating at #+-#59 kV. The half-lattice periods range from 21 cm to 31 cm. The entire machine will be approximately 30 m long, half of that is the induction accelerator and the remaining half is the injector (including the Marx generator) and the matching section. Elise will be built in a way that allows future expansion into the full ILSE configuration, therefore it will have an array of four ESQ focusing channels capable of transporting up to a total of 3.2 A of beam current. Elise will also have an active alignment system with an ...
1995-09-06
Dry coke quenching study. Final report, September 1978
The financial evaluation of capital and operating cost estimates for a dry coke quenching facility installation indicates a marginal return on investment if the evaluation is based exclusively on steam credits. However, the potential improvements in environmental emissions and reported, but unverified, blast furnace operations may justify the expenditure. The Russian and Japanese claim of 2 to 4% reduction in blast furnace coke usage with up to 4% increase in iron production has not been demonstrated in the domestic steel industry and, therefore, is not included in the financial analysis. A 2% coke reduction represents a savings of approximately $0.81 per ton of hot metal produced or an additional annual credit of $1,800,000 for dry coke quenching, exclusive of productivity gains. Additional credit of this magnitude would increase the estimated discounted cash flow return from 10% to approximately 16% for the estimated capital expenditure of ...
1978-09-01
A preliminary stage configuration for a low pressure nuclear thermal rocket (LPNTR)
Energy Technology Data Exchange (ETDEWEB)
A low pressure nuclear thermal rocket (LPNTR) is configured to meet the requirements of a nuclear stage for manned Mars exploration. Safety, reliability and performance are given equal consideration in selecting the stage configuration. Preliminary trade studies are conducted to size the engine thrust and determine the thrust chamber pressure. A weight breakdown and mechanical configuration for the selected LPNTR concept are defined. A seven engine stage configuration is selected which gives a two engine out capability and eliminates the need for engine gimbaling. The stage can be ground assembled and launched as a unit including tankage for trans Earth injection and Earth orbital capture. The tankage is configured to eliminate the need for an inert shield. The small engine will be cheaper to develop than a single engine providing full thrust, and will be compatible with stages for Earth orbital, Lunar and deep space missions. Mission analyses are presented with engine ...
1990-01-01
National Ignition Facility Management Descriptions Revision 4
Energy Technology Data Exchange (ETDEWEB)
The purpose of this document is to describe the NIF Project Organization and the roles and responsibilities of the managers charged with executing the Project.
2000-08-01
Energy Technology Data Exchange (ETDEWEB)
A common practice of electric utilities experiencing transmission and distribution (T and D) system overloads is to expand the substation, add lines, or upgrade equipment, all of which are capital intensive options. In 1988, it was hypothesized that strategically sited photovoltaics (PV) could benefit parts of T and D systems near or at overloaded conditions. An evaluation methodology was developed and applied to a test case (Kerman Substation near Fresno, California). Analytical results suggested that the value of PV to the T and D system could substantially exceed its energy and generation capacity value. The importance of this finding indicated the need for empirical validation. This led to the construction of a 0.5 MW PV demonstration plant by Pacific Gas and Electric Company (PG and E) at Kerman, California as part of the PVUSA (PV for Utility Scale Applications) project. PVUSA is a national public-private partnership that is assessing and demonstrating the ...
1994-07-01
Energy Technology Data Exchange (ETDEWEB)
Petro-Canada's Terra Nova offshore oil platform was designed with the expectation that its Floating, Production, Storage and Offloading (FPSO) vessel would be taken off location for maintenance and modifications work within the first 10 years of operation. Petro-Canada's 2006 extended Turnaround project was initiated to prepare for the maintenance and transport of the FPSO. The project aimed to execute an extended turnaround in approximately 90 days. The cost of the project was estimated at $190.5 million. Shutdown occurred early on May 7, 2006 due to the failure of a generator gearbox. Staff were increased from 80 to 120 to complete critical preparation work. On June 17, the FPSO was disconnected and departed for Conception Bay. A turret cover plate was installed, and the FPSO began its voyage to a Rotterdam shipyard in the Netherlands. In order to complete the journey, a ...
2006-07-01
Smart meter status report from Toronto
Energy Technology Data Exchange (ETDEWEB)
An update of Toronto Hydro's smart metering program was presented. Electricity demand is expected to keep increasing, and there is presently insufficient generation to match supply needs in Ontario. The smart metering program was introduced to aid in the Ontario government's energy conservation strategy, as well as to address peak supply problems that have led to power outages. It is expected that the smart metering program will reduce provincial peak supply by 5 per cent, as the meters support both time-of-use rates and critical peak pricing. Over 800,000 smart meters will be supplied to customers by 2007, and all 4.3 million homes in Toronto will have a smart meter by 2010. In order to meet targets for 2010, the utility will continue to install more 15,000 meters each month for the next 4 years. While the Ontario government has planned and coordinated the rollout and developed smart metering specifications and standards, Toronto Hydro is responsible for the ...
2006-07-01
Energy Technology Data Exchange (ETDEWEB)
This paper describes research and development activities at the University of Regina, Saskatchewan, Canada on Optimization of CO{sub 2} Extraction Process Technologies. The ultimate goal of this research is to develop better and more effective CO{sub 2} separation processes which can be used to recover CO{sub 2} from industrial sources such as coal-fired power plants and coal gasification complexes at the lowest possible capital and operating costs. The research program has been supported by Saskatchewan Power Corporation, Saskatchewan Energy and Mines, Prairie Coal Ltd., the Canada Centre for Mineral and Energy Technology (CANMET), Fluor Daniel Inc. (USA), Sulzer Chemtech (Switzerland), Wascana Energy Inc., and Natural Sciences and Engineering Research Council of Canada (NSERC). Currently, six parallel and complementary projects have been carried out at the Process Systems Laboratory. These projects are: (1) Searching for ...
1996-05-01
Repowering: improving the economics of existing assets
Energy Technology Data Exchange (ETDEWEB)
Restructured power markets require concepts not only for extending the lifetime of existing plants, but also concepts for reducing the life-cycle costs of existing older steam power plants in order to remain competitive with the most modern and advanced power generation technology such as combined cycle power plants. Out of the broad range of methods to extend service life and increase availability, and to increase power output and efficiency, this paper focuses on full repowering. Full repowering replaces the old fired boiler with gas turbine(s) and heat-recovery steam generators (HRSG) as heat input to the existing bottoming cycle and reuses the steam turbine (ST) condenser and further balance of plant (BOP) equipment. The potential offered by this concept is demonstrated. Repowering and modernization projects are executed if they result in economic benefits for the operator. Investment decisions need to be prepared based on an estimate or ...
2005-07-01
International Nuclear Information System (INIS)
Environmental regulatory requirements at both the state and federal level are constantly changing, making it difficult for industry and R ampersand D program managers to project future compliance requirements and costs. Even if a company is trying to keep abreast of various proposed regulatory initiatives, the number of possible combinations of initiatives that could occur in the future seems virtually limitless. Uncertainty associated with potential future environmental compliance requirements makes the identification and evaluation of future investment and R ampersand D opportunities exceedingly difficult, and makes the process of systematic strategic planning increasingly complex. This paper describes a methodology for accounting for uncertain future environmental compliance costs in a systematic, comprehensive manner. Through analysis of proposed initiatives for making future environmental requirements more stringent, forecasting the likelihood of occurrence ...
1995-03-27
Smith-Purcell free-electron laser
International Nuclear Information System (INIS)
The term Smith-Purcell free electron laser can be employed generally to describe any coherent radiation source in which a diffraction grating is used to couple an electron beam with the electromagnetic field. To date, most practical developments of this concept have focused on devices which operate in the millimeter spectral regime. In this paper construction of a Smith-Purcell free-electron laser operating in the far-infrared (FIR) region using a novel resonator cavity design and the electron beam from a low energy (0.5-5 MeV) radio-frequency accelerator will be discussed. A tunable source in this region would have many applications and since the beam energy is low, the small size and low overall cost of such a device would make it a laboratory instrument. Current projects which are progressing towards developing a FIR source are the programs at Stanford and CREOL. Both of these projects are using ...
1995-08-21
Energy Technology Data Exchange (ETDEWEB)
This technical memorandum (TM) documents the 1995 characterization of eight underground radioactive waste tanks at Oak Ridge National Laboratory (ORNL). These tanks belong to the Gunite and Associated Tanks (GAAT) operable unit, and the characterization is part of the ongoing GAAT remedial investigation/feasibility study (RI/FS) process. This TM reports both field observations and analytical results; analytical results are also available from the Oak Ridge Environmental Information System (OREIS) data base under the project name GAAT (PROJ-NAME = GAAT). This characterization effort (Phase II) was a follow-up to the {open_quotes}Phase I{close_quotes} sampling campaign reported in Results of Fall 1994 Sampling of Gunite and Associated Tanks at the Oak Ridge National Laboratory, Oak Ridge, Tennessee, ORNL/ER/Sub/87-99053/74, June 1995. The information contained here should be used in conjunction with that in the previous TM. The sampling plan is ...
1996-02-01
Energy Technology Data Exchange (ETDEWEB)
Among the items of the Sunshine Project in fiscal 1981 for development of a solvent extraction and liquefaction plant, this paper describes the achievements in developing secondary hydrogenation. A small continuous hydrogenation device equipped with three reaction columns that can be filled with catalyst of 50 cc, and a dedicated testing room were designed, and orders were placed with manufacturers. The fabrication, assembly, delivery, installation, piping and wiring were all completed. The device passed a completion inspection based on the high-pressure gas safety assurance law in December 1981. After leakage due to gas and material oil was checked, a trial operation was performed, and verified of normal operation. A screening test was carried out on three kinds of commercially available and prototype catalysts before testing the SRC containing material for studying the secondary hydrogenation. The circulating solvent ...
1982-03-01
Progress and recent utilization trends in combustion of Chinese oil shale
Energy Technology Data Exchange (ETDEWEB)
In China, the conventional utilization of oil shale is concentrated mainly on oil shale retorting, and burning oil shale in pulverized furnaces, or bubbling fluidized beds. To improve the availability of oil shale, many specialists have advocated burning oil shale in a circulating fluidized bed (CFB), which has a satisfactory combustion efficiency, low NOx and SO{sub 2} emission, adaptability to low-grade coal, etc. In Huadian, China, a plant incorporating three units of 65 th{sup -1} oil shale-fired CFB began successful commercial operation in 1996, proving that burning oil shale in a CFB produces both high combustion efficiency and environmental protection. For effective utilization of oil shale, its pyrolysis and combustion characteristics, emission performance of gaseous pollutants from an oil shale-fired CFB pilot setup, co-combustion characteristics of oil shale and high sulfur coal as well as the operating performance of the Huadian CFB ...
2007-12-15
Marine transportation of oil from Timan Pechora and from inland Russian fields
Energy Technology Data Exchange (ETDEWEB)
As part of The International Northern Sea Route Programme (INSROP), Subprogram III, Trade and Commercial Shipping, a study has been made concerning seaborne export of liquefied petroleum gas (LPG) from the Northern Russia, especially the West Siberian fields in Tyumen. The main purpose of the total project III.0703, part 2 and this study is to evaluate the economic viability of seaborne export from this area to the European region, mainly with the use of a special ice-strengthened LPG vessel, constructed and designed for such seaborne operations. This study concentrates on both seaborne LPG transportation, the demand and supply for seaborne LPG in the world and marine transportation of LPG from the West Siberian fields. Another purpose is to see which regions are potential exporters, importers and buyers of seaborne export of LPG from Tyumen. Currently large quantities of liquefied gas are flared off at the West Siberian fields due to ...
1996-05-01
Energy Technology Data Exchange (ETDEWEB)
A study of advancements in power plant designs for use at geothermal resources in the low to moderate (300 to 400F) temperature range is reported. In 3 case studies, the benefits of R and D to achieve these advancements are evaluated in terms of expected increases in installed geothermal generating capacity over the next 2 decades. A parametric sensitivity study is discussed which analyzes differential power development for combinations of power plant efficiency and capitol cost. Affordable tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described. Included in this assessment is an analysis of each of the major cost components of the project, including (1) construction cost, (2) well field development costs, (3) fluid purchase costs, and (4) well field and ...
1983-06-30
Energy Technology Data Exchange (ETDEWEB)
Intensive harvesting, whole-tree harvesting, and complete-tree utilization are being incorporated into management plans. Plants require sixteen or more nutrients. To determine impacts of intensive harvesting, research has begun to investigate nutrient losses associated with the removal of harvested material. Research efforts are focusing on quantifying direct nutrient loss from removal of additional biomass and identifying direct nutrient losses associated with whole-tree harvesting operations. An estimated 30-65% increase in biomass removal (from whole-tree harvesting operations as opposed to stem-only harvests) is accompanied by a 100-215% increase in nutrient removal. Whole-tree harvesting of hardwoods doubles the removal of nutrients from stem-only harvests. The significance of direct nutrient loss is not agreed upon. Some studies indicate that while stem-only harvests remove nutrients at rates replenishable from other sources, there is ...
1982-01-01
This project proposes to design and develop a new class of power converters (direct DC to AC) to drastically improve performance and optimize the cost, size, weight and volume of the DC to AC converter in SOFC systems. The proposed topologies employ a high frequency link; direct DC to AC conversion approach. The direct DC to AC conversion approach is more efficient and operates without an intermediate dc-link stage. The absence of the dc-link, results in the elimination of bulky, aluminum electrolytic capacitors, which in turn leads to a reduction in the cost, volume, size and weight of the power electronic converter. The feasibility of two direct DC to AC converter topologies and their suitability to meet SECA objectives will be investigated. Laboratory proto-type converters (3-5kW) will be designed and tested in Phase-1. A detailed design trade-off study along with the test results will be available in the form of a report for the evaluation ...
2003-12-01
Design of a closed 4 MW spallation target module with heat removal system for an ADS system
International Nuclear Information System (INIS)
At the Forschungszentrum Karlsruhe the HGF Strategy Fund project entitled 'Innovative Technology to Reduce Radiotoxicity' is performed which delivers an essential scientific contribution to the application oriented fundamental research for Accelerator Driven Systems (ADS). The addressed topics are in the areas of heavy liquid metal technology, thermalhydraulics and materials / corrosion. An ADS consists of three main components: an proton accelerator, a spallation target and a subcritical blanket. The strategic objective of an ADS is the transmutation of long-lived radioactive waste (plutonium, minor actinides and long-lived fission products) into short-lived isotopes or stable elements, thus closing the fuel cycle. The objective of one task of the HGF Strategy Fund Project is the numerical calculation of a closed spallation target module. In a consequent next step such a spallation target can be experimentally investigated at IKET and the ...
Coal liquefaction process streams characterization and evaluation. Volume 1, Base program activities
This 4.5-year project consisted of routine analytical support to DOE`s direct liquefaction process development effort (the Base Program), and an extensive effort to develop, demonstrate, and apply new analytical methods for the characterization of liquefaction process streams (the Participants Program). The objective of the Base Program was to support the on-going DOE direct coal liquefaction process development program. Feed, process, and product samples were used to assess process operations, product quality, and the effects of process variables, and to direct future testing. The primary objective of the Participants Program was to identify and demonstrate analytical methods for use in support of liquefaction process development, and in so doing, provide a bridge between process design, and development, and operation and analytical chemistry. To achieve this objective, novel analytical methods were evaluated for ...
1994-05-01
Bench-scale Kinetics Study of Mercury Reactions in FGD Liquors
Energy Technology Data Exchange (ETDEWEB)
This document is the final report for Cooperative Agreement DE-FC26-04NT42314, 'Kinetics Study of Mercury Reactions in FGD Liquors'. The project was co-funded by the U.S. DOE National Energy Technology Laboratory and EPRI. The objective of the project has been to determine the mechanisms and kinetics of the aqueous reactions of mercury absorbed by wet flue gas desulfurization (FGD) systems, and develop a kinetics model to predict mercury reactions in wet FGD systems. The model may be used to determine optimum wet FGD design and operating conditions to maximize mercury capture in wet FGD systems. Initially, a series of bench-top, liquid-phase reactor tests were conducted and mercury species concentrations were measured by UV/visible light spectroscopy to determine reactant and byproduct concentrations over time. Other measurement methods, such as atomic absorption, were used to measure concentrations of ...
2008-03-31
Energy Technology Data Exchange (ETDEWEB)
The kraft recovery boiler is of critical importance for the paper and pulp industry. From only energy point of view, kraft recovery boilers supply more than 50% of total thermal energy consumed in the paper and pulp industry. A kraft recovery boiler has two main functions: firstly to recover the inorganic cooking chemicals in the black liquor for reuse in the pulping process, and secondly to make use of the chemical energy in the organic portion of the black liquor to generate super-heated steam for the plant. The twin objectives of recovering chemicals and energy makes the recovery boiler design and operation more complex than virtually any other boiler application. Thus there is a demand for development of an analytical tool that can be used to predict the performance of a kraft recovery boiler. This paper presents the results achieved from a project jointly financed by Swedish National Energy Administration and the industry (Iggesund ...
2001-07-01
Study tour to biomass gasifiers in Germany
International Nuclear Information System (INIS)
A study trip to a biomass gasification plant in Germany took place from 13-15 November 2000. The goal of the trip was to obtain information on German developments, experience, and possibilities in the field of biomass gasification. The participants were representatives of Dutch parties in the energy sector: waste sector, manufacturers, producers, policy makers and consultants. The most important feature was the visit to plants that were in operation. Due in particular to the new EEG (Emeuerbare-Energien-Gesetz/Renewable Energy) legislation, German policy makers have created an initial market for sustainable energy with a degree of success. The key feature is that EEG makes projects 'bankable' by guaranteeing a return delivery compensation. An EEG-type scheme designed to accelerate the development of sustainable energy could be an interesting instrument also for the Netherlands. The plan was to visit four plants and have a number of ...
2000-11-01
Recovery and reuse of spent acetone via a mobile solvent recovery unit
Energy Technology Data Exchange (ETDEWEB)
The Monsanto Chemical Company operates a plastics and resins plant located in Addyston, Ohio. The process equipment requires routine rinsing with technical grade acetone between batches. Due to the volumes of spent acetone generated and the associated RCRA hazardous waste regulations, the plant sought to recycle and reuse the acetone to reduce the purchase cost of virgin acetone and the cost of spent acetone disposal. One of the first options explored was package unit distillation units. The cost of these units was in the $20--$30,000 range in 1989 dollars. Even though the cost of a package unit was not deemed unreasonable, there were additional costs and concerns that led to elimination of this option. The unit would have required additional manpower to operate and maintain, i.e., at least a fraction of an operator and mechanic. For plant safety reasons, it was desired to operate this package unit ...
1996-11-01
Improvement of fuel performance in the Wolsung Nuclear Power Plant
International Nuclear Information System (INIS)
From the start of commercial operation in 1983 until the end of 1985, the Wolsung Nuclear Power Plant operated for about 800 effective full power days (EFPDs). During this relatively short operational period it experienced various problems but achieved high reliability in operation. Wolsung recorded economical fuel utilization, particularly in 1985, together with a 94.4% plant capacity factor; it also showed successful in-pile test results as part of a fuel localization project. The actual fuelling rate was 16.3 bundles per EFPD in 1985, i.e. a saving of about 11% compared with the design fuelling rate of 18.2 bundles per EFPD. Better fuel performance was achieved because minimum excess reactivity was maintained in the core, characteristics unique to the core were found and the spatial flux distribution was controlled. The average discharge fuel burnup in 1985 was 6993 MW#centre ...
1986-09-15
International Nuclear Information System (INIS)
Within the United Kingdom, the regulatory body having responsibility for the licensing of nuclear installations is the Health and Safety Executive (HSE). The Nuclear Installations Inspectorate (NII) is that part of HSE which administers this function. Discussions on the applicability of quality assurance (QA) to licensed sites began in 1974, and an internal report was published in 1975. In parallel with work going on at the International Atomic Energy Agency (IAEA) to prepare Quality Assurance for Safety in Nuclear Power Plants: A Code of Practice, Safety Series No. 50-C-QA, NII published a second report in 1978 entitled A Guide to the Quality Assurance Programme for Nuclear Power Plants. In 1980, the construction of advanced gas cooled reactors at Heysham 2 and at Torness was licensed, and a condition was attached to the licences requiring the licensees to submit their QA arrangements to the NII for approval. The licensees' response was to produce separate QA programmes covering the ...
1988-11-07
Characterisation of dust material emitted during harbour operations (HADA Project)
Energy Technology Data Exchange (ETDEWEB)
The aim of this work is to compile an inventory of the main characteristics (chemical, morphological, mineralogical and grain size parameters) of the bulk cargo materials and of the material emitted during different port operations for possible use as tracers of the fugitive PM emission sources. For all cases, the tracer characteristics determined for each bulk material were also identified in the corresponding PM material emitted. This inventory could assist the harbour authorities to identify the origin of high PM events recorded by air quality monitoring networks in harbour areas, and could also help modellers to predict the impact of harbour activities on ambient PM levels. The harbour of Tarragona (north-east Spain) was selected for this study given the high volume of solids in bulk handled. To this end, 12 handling operations of selected materials (clinker, phosphate, pyrite ash, Mn mineral, fine Si-Mn, coke (coal), bituminous coal, ...
2007-09-15
Kokanee Stocking and Monitoring, Flathead Lake, 1993-1994 Annual Report.
Energy Technology Data Exchange (ETDEWEB)
One mitigation goal of the Hungry Horse Dam fisheries mitigation program, funded by the Bonneville Power Administration, is to replace lost production of 100,000 adult kokanee in Flathead Lake. The mitigation program calls for a five-year test to determine if kokanee can be reestablished in Flathead Lake. The test consists. of annual stocking of one million hatchery-raised yearling kokanee. There are three benchmarks for judging the success of the kokanee reintroduction effort: (1) Post-stocking survival of 30 percent of planted kokanee one year after stocking; (2) Yearling to adult survival of 10 percent (100,000 adult salmon); (3) Annual kokanee harvest of 50,000 or more fish per year by 1998, with an average length of 11 inches or longer for harvested fish, and fishing pressure of 100,000 angler hours or more. Kokanee were the primary sport fish species in the Flathead Lake fishery in the early 1900s, and up until the late 1980s when the population rapidly ...
1995-07-01
NORTH HILL CREEK 3-D SEISMIC EXPLORATION PROJECT
Energy Technology Data Exchange (ETDEWEB)
Wind River Resources Corporation (WRRC) received a DOE grant in support of its proposal to acquire, process and interpret fifteen square miles of high-quality 3-D seismic data on non-allotted trust lands of the Uintah and Ouray (Ute) Indian Reservation, northeastern Utah, in 2000. Subsequent to receiving notice that its proposal would be funded, WRRC was able to add ten square miles of adjacent state and federal mineral acreage underlying tribal surface lands by arrangement with the operator of the Flat Rock Field. The twenty-five square mile 3-D seismic survey was conducted during the fall of 2000. The data were processed through the winter of 2000-2001, and initial interpretation took place during the spring of 2001. The initial interpretation identified multiple attractive drilling prospects, two of which were staked and permitted during the summer of 2001. The two initial wells were drilled in September and October of 2001. A deeper test was drilled in June of ...
2004-05-06
Energy Technology Data Exchange (ETDEWEB)
A Lawrence Livermore National Laboratory (LLNL) Management Pre-Start Review (MPR) Team was formed to independently verify the operational readiness of Building 368 (B368) Biosafety Level III (BSL-3) Facility to conduct research with biological pathogens and toxins including those considered Select Agents. Review objectives and criteria were developed from the DOE/NNSA and LLNL requirements. These were provided in the Implementation Plan for the Biosafety Level III (BSL-3) Facility Management Pre-Start Review (BSL-3 MPR) at Lawrence Livermore National Laboratory that was reviewed and approved by DOE/NNSA-LSO. The formal part of the LLNL MPR for the BSL-3 Facility was begun in August of 2005 but work on the MPR was stopped in October of 2005 due to the need for LLNL to reassess organizational and operational controls and respond to Centers for Disease Control and Prevention inquiries related to a shipping incident involving select agents. The MPR ...
2006-07-25
Energy Technology Data Exchange (ETDEWEB)
The Interstate Oil and Gas Compact Commission (IOGCC) engaged in numerous projects outlined under the scope of work discussed in the United States Department of Energy (DOE) grant number DE-FG26-01BC15336 awarded to the IOGCC. Numerous projects were completed that were extremely valuable to state oil and gas agencies as a result of work performed utilizing resources provided by the grant. There are numerous areas in which state agencies still need assistance. This additional assistance will need to be addressed under another grant because funding resources have been exhausted under The scope of work objectives for the eight projects covered under this grant is as follows: (1) Improve uniformity within state oil and gas data management efforts. (2) Conduct environmental compliance workshops and related educational projects on natural gas and oil exploration and production. (3) Improve regulatory ...
2004-08-03
ENGINEERING DEVELOPMENT OF COAL-FIRED HIGH-PERFORMANCE POWER SYSTEMS
Energy Technology Data Exchange (ETDEWEB)
A High Performance Power System (HIPPS) is being developed. This system is a coal-fired, combined cycle plant with indirect heating of gas turbine air. Foster Wheeler Development Corporation and a team consisting of Foster Wheeler Energy Corporation, Bechtel Corporation, University of Tennessee Space Institute and Westinghouse Electric Corporation are developing this system. In Phase 1 of the project, a conceptual design of a commercial plant was developed. Technical and economic analyses indicated that the plant would meet the goals of the project which include a 47 percent efficiency (HHV) and a 10 percent lower cost of electricity than an equivalent size PC plant. The concept uses a pyrolyzation process to convert coal into fuel gas and char. The char is fired in a High Temperature Advanced Furnace (HITAF). The HITAF is a pulverized fuel-fired boiler/air heater where steam is generated and gas turbine air is indirectly heated. The fuel gas ...
1998-10-01
Energy Technology Data Exchange (ETDEWEB)
Since 1998, The Pennsylvania State University successfully managed the Consortium for Premium Carbon Products from Coal (CPCPC), which was a vehicle for industry-driven research on the promotion, development, and transfer of innovative technologies on premium carbon products from coal to the U.S. industry. The CPCPC was an initiative led by Penn State, its cocharter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provided the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350. This agreement ended November 2004 but the CPCPC activity continued under cooperative agreement No. DE-FC26-03NT41874, which started October 1, 2003 and ended December 31, 2010. The objective of the second agreement was to continue the successful operation of the CPCPC. The CPCPC enjoyed ...
2010-12-31
International Nuclear Information System (INIS)
The extraction of Am(III) and Eu(III) has been investigated using mixtures of synthesized aromatic dithiophosphinic acids (R_2PSSH) and tributylphosphate (TBP), trioctylphosphine oxide (TOPO) or tributylphosphine oxide (TBPO) in toluene from nitric acid (0.01-1.5 mol l"-"1). There was no detectable extraction when R_2PSSHs were used alone as extractants for either Am(III) or Eu(III) (D_A_m_,_E_u<10"-"4) under the experimental conditions used in this study. High separation factors (D_A_m/D_E_u>20) with D_A_m>1 were achieved in the nitric acid range 0.1-1 moll"-"1 by means of a synergistic mixture of bischlorodithiophosphinic acid with TBP, TOPO or TBPO. (orig.)
1998-06-12
Public power's roots deep in the Northwest
Energy Technology Data Exchange (ETDEWEB)
Municipal power systems developed early in the Pacific Northwest, but a new dimension was added in the 1930s when the public utility district (PUD) concept combining urban and rural areas encited vigorous debate and the public rejected private-utility candidates. A favorable national climate developed for consumer-owned systems during the 1920s and 30s encouraging the passage of the Federal Water Power Act, the creation of the Tennessee Valley Authority, the building of Hoover Dam, and the establishment of the Bonneville Power Administration. This article reviews developments following the Public Utility Act of 1935, which authorized the Federal Power Commission and the uniform system of accounts. After tracing the record of investigations and policy trends during the Roosevelt era, it concludes that utilities benefited from accounting regulations. (DCK)
1982-01-01
Estimates of quantitative genetic parameters of immunological traits in the chicken.
Three in vivo assays were used to measure the immunocompetence of chickens in two generations of a selection experiment. The obtained data were used to estimate the variance components for sire and dam for antibody production to Pasteurella multocida and Mycoplasma gallisepticum vaccines, for T-cell-mediated immunity evaluated by a phytohemagglutinin wing web assay, and for clearance of foreign particles from the circulatory system. Heritabilities of and genetic correlations among these immunological traits were calculated from the sire variance components. Heritability estimates of the immunological traits based on the sire component of variance ranged from .06 to .53, and genetic correlations among immunological traits were generally negative. PMID:1956847
1991-10-01
Development and analysis of stage-damage curves for the Kum River basin
Energy Technology Data Exchange (ETDEWEB)
In the flood surveys, it is fundamental to set up the relations of stage-damage. And this makes it possible to evaluate the flood regulation effects of the multipurpose dam and/or levee construction for optimum formulation. Unfortunately in the previous basin studies excluding the Han river basin survey, the conventional approaches on this matter have not been performed due to its time-consuming complexity. In this study we attempted a new method based on the disaster status, and constructed six stage-damage curves along the reaches of the Kum river basin, based upon the flood events records for recent 12 years (1981-92). (author). 12 refs., 3 tabs., 13 figs.
1996-10-31
British Library Electronic Table of Contents (United Kingdom)
SummaryThis paper examines the sensitivity and uncertainty of evaporation estimates from Nasser Lake, south of Egypt using data collected at the floating station Raft, 2km upstream of the Aswan High Dam, and 12 evaporation models. Based on their approach the evaporation models were ranked in five classes, respectively the Bowen ratio energy budget (BREB) approach, three energy-aerodynamic based methods, a mass transfer method, two temperature and five solar radiation-temperature approaches. State dependent parameter models were used to estimate the sensitivity indices of the different evaporation estimation methods at daily and monthly frequencies. A drastic reduction in the cost of the sensitivity analysis was obtained when coupled with efficient sampling methods, producing quasi-Monte Ca...
2010-01-01
The Environmental Management Project Manager`s Handbook for improved project definition
Energy Technology Data Exchange (ETDEWEB)
The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.
1995-02-01
Energy Technology Data Exchange (ETDEWEB)
Preserving customers` investments in capital goods is one of the strategic market services offered by ABB, and to this end the company has developed project-specific retrofit concepts especially for older power generation plant. A prime example of such a modernization is the Umm Al Nar East (UANE) combined cycle power station in Abu Dhabi, UAE. UANE has two gas turbines of type GT13D, which together generate 140 MW of electrical energy, and heat-recovery boilers which supply steam to a seawater desalination plant with a capacity of 80 million liters of drinking water per day. After almost 20 years in operation, UANE is being modernized. To address the owner`s concerns and minimize plant downtime, ABB has introduced Service, Operation and Rehabilitation (SOR) Key Account Management for Abu Dhabi. In the first phase of the modernization project, the static starting equipment was upgraded and the ...
1998-05-01
IMPROVED NATURAL GAS STORAGE WELL REMEDIATION
Energy Technology Data Exchange (ETDEWEB)
This report summarizes the research conducted during Budget Period One on the project ''Improved Natural Gas Storage Well Remediation''. The project team consisted of Furness-Newburge, Inc., the technology developer; TechSavants, Inc., the technology validator; and Nicor Technologies, Inc., the technology user. The overall objectives for the project were: (1) To develop, fabricate and test prototype laboratory devices using sonication and underwater plasma to remove scale from natural gas storage well piping and perforations; (2) To modify the laboratory devices into units capable of being used downhole; (3) To test the capability of the downhole units to remove scale in an observation well at a natural gas storage field; (4) To modify (if necessary) and field harden the units and then test the units in two pressurized injection/withdrawal gas storage wells; and (5) To prepare the ...
2001-12-01
DoseWatchers - A computer based X ray dose monitoring project in paediatric radiology
International Nuclear Information System (INIS)
Full text: Introduction. Children, especially premature infants and neonates, are at a much higher risk to obtain an X ray induced disturbance of life - particularly cancer. On the one hand this is due to their longer life expectancy and on the other hand it is due to their higher cell proliferation rate. The paediatric radiology unit of the Inselspital Bern recently installed some of the most advanced X ray equipment nowadays available. It is based on the two latest digital technologies: double read computed radiography (CR) and direct digital radiography (DR). Only the implementation of these digital radiography systems permits the digital acquisition and additionally the analysis of acquired data. The systematic analysis of large amounts of biometric data and exposition data is the basis for further dose reduction and a systematic quality control (QC). Patients are increasingly critical concerning radiation exposure - especially parents regarding their children. Besides an ...
2006-11-13
Fundamental Chemistry And Thermodynamics Of Hydrothermal Oxidation Processes
Hydrothermal oxidation (HTO) is a promising technology for the treatment of aqueous-fluid hazardous and mixed waste streams. Waste streams identified as likely candidates for treatment by this technology are primarily aqueous fluids containing hazardous organic compounds, and often containing inorganic compounds including radioisotopes (mixed wastes). These wastes are difficult and expensive to treat by conventional technologies (e.g. incineration) due to their high water content; in addition, incineration can lead to concerns related to stack releases. An especially attractive potential advantage of HTO over conventional treatment methods is the total containment of all reaction products within the overall system. The potential application of hydrothermal oxidation (HTO) technology for the treatment of DOE hazardous or mixed wastes has been uncertain due to concerns about safe and efficient operation of the technology. In principle, aqueous DOE wastes, including ...
2001-12-31
Energy Technology Data Exchange (ETDEWEB)
The Lowell Hydroelectric Project (Eldred L. Field) is a key feature of the Departments of Energy's National Low Head Hydroelectric Power Demonstration Program. This report summarizes the Project's Construction which began in October 1983 and was completed in November 1985. It also details project construction costs.
1988-03-01
Research accomplishments and future goals in particle physics
Energy Technology Data Exchange (ETDEWEB)
This document presents our proposal to continue the activities of Boston University researchers in eight projects in high energy physics research: Colliding Beams Physics; Accelerator Design Physics; MACRO Project; Proton Decay Project; Theoretical Particle Physics; Muon G-2 Project; and Hadron Collider Physics. The scope of each of these projects is presented in detail in this paper.
1990-01-05
Project quality assurance plant: Sodium storage facility, project F-031
International Nuclear Information System (INIS)
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
Energy Technology Data Exchange (ETDEWEB)
The Atlantic Wind Test Site was established in 1980 as a laboratory to facilitate the evaluation and demonstration of wind energy systems and equipment. This annual report describes its organization and management, facilities, major projects, and the outlook for the future. Major projects include wind diesel; AWTS-IREQ collaboration; remote community data acquisition; lagerwey test program; Alaska Energy Authority Project; public education; Atlantic Orient Corporation 15/50 Project; and the soft VAWT project.
1994-12-31
ATLAS tile calorimeter electronics upgrade
This presentation summarizes the present upgrade R&D projects in the TileCal collaboration. One project studies the possibility to divide the drawers into smaller minidrawers to simplify maintenance. There are three different front-end projects. There are also projects dealing with high voltage and low voltage distribution, projects for developing PMT dividers, low voltage electronics, data transmission and off-detector electronics.
2011-01-01
ETE-EVAL: a methodology for D and D cost estimation
International Nuclear Information System (INIS)
In compliance with Article 20 of the sustainable radioactive materials and waste management act dated 28 June 2006, the CEA and AREVA are required every three years to revise the cost of decommissioning their facilities and to provide the necessary assets by constituting a dedicated fund. For the 2007 revision the CEA used ETE-EVAL V5. Similarly, AREVA reevaluated the cost of decontaminating and dismantling its facilities at La Hague, as the previous estimate in 2004 did not take into account the complete cleanup of all the structural work. ETE-EVAL V5 is a computer application designed to estimate the cost of decontamination and dismantling of basic nuclear installations (INB). It has been qualified by Bureau Veritas and audited. ETE-EVAL V5 has become the official software for cost assessment of CEA civilian and AREVA decommissioning projects. It has been used by the DPAD (Decontamination and Dismantling Projects Department) cost assessment ...
Website Policies and Important Links Comments
WorldWideScience.org is maintained by the U.S. Department of Energy's
Office of Scientific and Technical Information as the Operating Agent
for the WorldWideScience Alliance.