  1. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  2. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2006 - March 2007. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2008-01-01

    Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.

  3. A progressive methodology for seismic safety evaluation of gravity dams

    International Nuclear Information System (INIS)

    Ghrib, F.; Leger, P.; Tinawi, R.; Lupien, R.; Veilleux, M.

    1995-01-01

    A progressive methodology for the seismic safety evaluation of existing concrete gravity dams was described. The methodology was based on five structural analysis levels with increasing complexity to represent inertia forces, dam-foundation and dam-interaction mechanisms, as well as concrete cracking. The five levels were (1) preliminary screening, (2) pseudo-static method, (3) pseudo-dynamic method, (4) linear time history analysis, and (5) non-linear history analysis. The first four levels of analysis were applied for the seismic safety evaluation of Paugan gravity dam (Quebec). Results showed that internal forces from pseudo-dynamic, response spectra and transient finite element analyses could be used to interpret the dynamic stability of dams from familiar strength-based criteria. However, as soon as the base was cracked, the seismically induced forces were modified, and level IV analyses proved more suitable to handle rationally these complexities. 8 refs., 7 figs., 1 tab

  4. Effects of the Operation of Hungry Horse Dam on the Kokanee Fishery in the Flathead River System, 1983 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.

    1983-11-01

    This study was undertaken to assess the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. This annual report covers the 1982-1983 field season concerning the effects of Hungry Horse operations on kokanee abundance, migration, spawning, egg incubation and fry emergence in the Flathead River system. This report also addresses the expected recovery of the mainstem kokanee population under the flow regime recommended by the Department of Fish, Wildlife and Parks in 1982.

  5. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  6. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; Annual Progress Report, April 2007 - March 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Mallette, Christine [Oregon Department of Fish and Wildlife

    2009-07-28

    We report on our progress from April 2007 through March 2008 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), Columbia River Inter-Tribal Fish Commission (CRITFC; Report C), and Montana State University (MSU; Report D). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  7. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong; Bao, Kai; Zhang, Hui

    2011-01-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  8. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  9. The Glen Canyon Dam adaptive management program: progress and immediate challenges

    Science.gov (United States)

    Hamill, John F.; Melis, Theodore S.; Boon, Philip J.; Raven, Paul J.

    2012-01-01

    Adaptive management emerged as an important resource management strategy for major river systems in the United States (US) in the early 1990s. The Glen Canyon Dam Adaptive Management Program (‘the Program’) was formally established in 1997 to fulfill a statutory requirement in the 1992 Grand Canyon Protection Act (GCPA). The GCPA aimed to improve natural resource conditions in the Colorado River corridor in the Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona that were affected by the Glen Canyon dam. The Program achieves this by using science and a variety of stakeholder perspectives to inform decisions about dam operations. Since the Program started the ecosystem is now much better understood and several biological and physical improvements have been achieved. These improvements include: (i) an estimated 50% increase in the adult population of endangered humpback chub (Gila cypha) between 2001 and 2008, following previous decline; (ii) a 90% decrease in non-native rainbow trout (Oncorhynchus mykiss), which are known to compete with and prey on native fish, as a result of removal experiments; and (iii) the widespread reappearance of sandbars in response to an experimental high-flow release of dam water in March 2008.Although substantial progress has been made, the Program faces several immediate challenges. These include: (i) defining specific, measurable objectives and desired future conditions for important natural, cultural and recreational attributes to inform science and management decisions; (ii) implementing structural and operational changes to improve collaboration among stakeholders; (iii) establishing a long-term experimental programme and management plan; and (iv) securing long-term funding for monitoring programmes to assess ecosystem and other responses to management actions. Addressing these challenges and building on recent progress will require strong and consistent leadership from the US Department of the Interior

  10. Fault-dominated deformation in an ice dam during annual filling and drainage of a marginal lake

    Science.gov (United States)

    Walder, J.S.; Trabant, D.C.; Cunico, M.; Anderson, S.P.; Anderson, R. Scott; Fountain, A.G.; Malm, A.

    2005-01-01

    Ice-dammed Hidden Creek Lake, Alaska, USA, outbursts annually in about 2-3 days. As the lake fills, a wedge of water penetrates beneath the glacier, and the surface of this 'ice dam' rises; the surface then falls as the lake drains. Detailed optical surveying of the glacier near the lake allows characterization of ice-dam deformation. Surface uplift rate is close to the rate of lake-level rise within about 400 m of the lake, then decreases by 90% over about 100 m. Such a steep gradient in uplift rate cannot be explained in terms of ice-dam flexure. Moreover, survey targets spanning the zone of steep uplift gradient move relative to one another in a nearly reversible fashion as the lake fills and drains. Evidently, the zone of steep uplift gradient is a fault zone, with the faults penetrating the entire thickness of the ice dam. Fault motion is in a reverse sense as the lake fills, but in a normal sense as the lake drains. As the overall fault pattern is the same from year to year, even though ice is lost by calving, the faults must be regularly regenerated, probably by linkage of surface and bottom crevasses as ice is advected toward the lake basin.

  11. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L. (Oregon Department of Fish and Wildlife)

    2004-02-01

    We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  12. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.; Kern, J. Chris; Hughes, Michele L.

    2003-12-01

    We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

  13. Annual progress report 1981

    International Nuclear Information System (INIS)

    1982-01-01

    This annual progress report of the CEA Protection and Nuclear Safety Institut outlines a brief description of the progress made in each section of the Institut. Research activities of the Protection department include, radiation effects on man, radioecology and environment radioprotection techniques. Research activities of the Nuclear Safety department include, reactor safety analysis, fuel cycle facilities safety analysis, safety research programs. The third section deals with nuclear material security including security of facilities, security of nuclear material transport and monitoring of nuclear material management [fr

  14. Progress Report 1994

    International Nuclear Information System (INIS)

    1995-01-01

    This document is the 1994 annual progress report of the CEA-Direction of Waste Management (DGD). It comprises four chapters. The first chapter is a general presentation of radioactive wastes, of the management of liquid effluents, solid wastes, sealed sources, of the relations with the ANDRA (The French Agency for the Management of Radioactive Wastes), and of the research and development studies in progress for the improvement of waste management. The second chapter concerns the spent fuels and their reprocessing, in particular AGR and PWR type reactor fuels, the ''Caramel'' fuel from Osiris reactor and the cover elements from the Rapsodie reactor core. The long time storage of ancient fuels is also discussed. The third chapter concerns the dismantling of decommissioned installations, the actions in progress and the planning of dismantling actions up to the year 2000. Chapter four is devoted to the management of wastes from the Direction of Military Applications (DAM), the actions in progress in the different DAM centers and the cleansing projects at Marcoule plant. (J.S.). 5 figs., 28 tabs., 21 photos., 3 appendix

  15. 1985. Annual progress report

    International Nuclear Information System (INIS)

    1986-01-01

    This annual progress report of the CEA Protection and Nuclear Safety Institut outlines a description of the progress made in each sections of the Institut Research activities of the different departments include: reactor safety analysis, fuel cycle facilities analysis; and associated safety research programs (criticality, sites, transport ...), radioecology and environmental radioprotection techniques; data acquisition on radioactive waste storage sites; radiation effects on man, studies on radioprotection techniques; nuclear material security including security of facilities, security of nuclear material transport, and monitoring of nuclear material management; nuclear facility decommissioning; and finally the public information [fr

  16. Lower Granite dam smolt monitoring program: annual report, 2000; ANNUAL

    International Nuclear Information System (INIS)

    Morrill, Charles

    2000-01-01

    The 2000 fish collection season at Lower Granite was characterized by lower than average spring flows and spill, low levels of debris, cool water temperatures, increased unclipped yearling and subyearling chinook smolts, and 8,300,546 smolts collected and transported compared to 5,882,872 in 1999. With the continued release of unclipped supplementation chinook and steelhead above Lower Granite Dam, we can no longer accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. Although some table titles in this report still show ''wild'' column headings, the numbers in these columns for 1999 and 2000 include wild and unclipped hatchery origin smolts. The increases over previous years reflect the increased supplementation. A total of 8,300,546 juvenile salmonids were collected at Lower Granite Dam. Of these, 187,862 fish were bypassed back to the river and 7,950,648 were transported to release sites below Bonneville Dam, 7,778,853 by barge and 171,795 by truck. A total of 151,344 salmonids were examined in daily samples. Nine research projects conducted by four agencies impacted a total of 1,361,006 smolts (16.4% of the total collection)

  17. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  18. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    2009-05-26

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries

  19. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bellgraph, Brian J. [Pacific Northwest National Laboratory

    2009-03-31

    The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull trout were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.

  20. Lower Granite Dam Smolt Monitoring Program, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mensik, Fred; Rapp, Shawn; Ross, Doug (Washington Department of Fish and Wildlife, Olympia, WA)

    2007-01-01

    The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam, 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers

  1. Lower Granite Dam Smolt Monitoring Program, Annual Report 2005-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Menski, Fred

    2007-01-01

    The 2005 fish collection season at Lower Granite Dam (LGR) was characterized by average water temperatures, below average flows, above average spill, low levels of debris and the record number of smolts collected compared to the previous five years. With the continued release of unclipped supplementation chinook and steelhead above LGR, we cannot accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. For the purposes of this report we will designate fish as clipped and unclipped. This season a total of 13,030,967 juvenile salmonids were collected at LGR. Of these, 12,099,019 were transported to release sites below Bonneville Dam, 12,032,623 by barge and 66,396 by truck. An additional 898,235 fish were bypassed to the river due to over-capacity of the raceways, barges or trucks and for research purposes. This was the first season of summer spill at LGR. Spill was initiated at 12:01am June 20 as directed by the ruling set forth by Judge James Redden of the United States District Court (Order CV 01-640-RE). In addition, the Lower Granite project also conducted a summer spill test alternating spill and spill patterns between spill to the gas cap without the removable spillway weir (RSW) and spill with up to 20 kcfs utilizing the RSW. Because of the forecast low flow this year, most hatchery reared subyearling fall chinook were released up to three weeks early. With the unexpected high flows in late May and early June, more than 90% of the subyearling chinook were collected prior to the initiation of the court ordered summer spill program. Collection number fluctuations reflect river flow and project operations for any given year. For example, low flow years (2001, 2004 and 2005) result in higher collection numbers. Court ordered spill throughout the summer migration will directly affect collection of fall subyearling chinook collection numbers. The editors of this report urge the reader to use caution when comparing fish collection numbers

  2. Proceedings of the Canadian Dam Association's 2005 annual conference : 100 years of dam experience : balancing tradition and innovation. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-09-01

    This conference provided a forum to promote discussion on improving the management and safety of dams. It featured 8 technical sessions as well as workshops to discuss dam safety guidelines and guidelines for extreme flood analyses and their applications. It also featured workshops on instrumentation and performance monitoring of dams; tailing dam closures and reclamation; and, practical approaches to emergency preparedness for dam owners. The discussions provided details on large hydropower development projects, their innovations in environmental impact assessment, mitigation, and monitoring. The conference included a technical component led by experts on dams and tailings facilities. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and safety guidelines. All 24 presentations at this conference have been catalogued separately for inclusion in this database

  3. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rien, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-03-01

    We report on our progress from April 2004 through March 2005 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  4. White Sturgeon Mitgation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2005-08-01

    We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

  5. Dams. Bulletin of the technical service of electric power and big dams; Barrages. Bulletin du service technique de l`energie electrique et des grands barrages (STEEGB)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Four papers were selected in this issue of `Barrages` bulletin. The first one concerns the surveillance of medium size dams, the second one deals with the life of French dams in operation (safety decennial and annual inspections). The third paper describes the behaviour of free flow spillways installed on loam dams while the last paper reports on the activities of the control service of the STEEGB for the second quarter of 1997 (decennial and annual inspections, important facts, administrative instructions, draining, floods, granting etc..). (J.S.)

  6. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1990-09-01

    We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

  7. Progress Report 1994; Rapport d`activite 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This document is the 1994 annual progress report of the CEA-Direction of Waste Management (DGD). It comprises four chapters. The first chapter is a general presentation of radioactive wastes, of the management of liquid effluents, solid wastes, sealed sources, of the relations with the ANDRA (The French Agency for the Management of Radioactive Wastes), and of the research and development studies in progress for the improvement of waste management. The second chapter concerns the spent fuels and their reprocessing, in particular AGR and PWR type reactor fuels, the ``Caramel`` fuel from Osiris reactor and the cover elements from the Rapsodie reactor core. The long time storage of ancient fuels is also discussed. The third chapter concerns the dismantling of decommissioned installations, the actions in progress and the planning of dismantling actions up to the year 2000. Chapter four is devoted to the management of wastes from the Direction of Military Applications (DAM), the actions in progress in the different DAM centers and the cleansing projects at Marcoule plant. (J.S.). 5 figs., 28 tabs., 21 photos., 3 appendix.

  8. Dam's infection progress and within-herd prevalence as predictors of Mycobacterium avium subsp. paratuberculosis ELISA response in Danish Holstein cattle

    DEFF Research Database (Denmark)

    Nielsen, Søren Saxmose; Hansen, Kira Frello; Kvist, Louise

    2016-01-01

    potentially important for MAP transmission control. The objective of this study was therefore to assess the dam's infection progress and the within-herd test-prevalence as predictors of MAP infection in Danish dairy cattle. MAP specific antibody ELISA records from 95,025 dam-offspring pairs were combined...... with test-prevalence estimates from 939 Danish Holstein herds. The odds of testing ELISA-positive given the within-herd test-prevalence and the time-period a dam had had MAP specific antibodies were estimated for the offspring. Both dams and offspring were tested as adults, and parity-group was used...

  9. Expansion at Olympic Dam

    International Nuclear Information System (INIS)

    Lewis, C.

    1997-01-01

    The Olympic Dam orebody is the 6th largest copper and the single largest uranium orebody in the world. Mine production commenced in June 1988, at an annual production rate of around 45,000 tonnes of copper and 1,000 tonnes of uranium. Western Mining Corporation announced in 1996 a proposed $1.25 billion expansion of the Olympic Dam operation to raise the annual production capacity of the mine to 200,000 tonnes of copper, approximately 3,700 tonnes of uranium, 75,000 ounces of gold and 950,000 ounces of silver by 2001. Further optimisation work has identified a faster track expansion route, with an increase in the capital cost to $1.487 billion but improved investment outcome, a new target completion date of end 1999, and a new uranium output of 4,600 tonnes per annum from that date

  10. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    where the annual maximum temperature typically occurred in September or October. Without-dam temperatures also tended to have more daily variation than with-dam temperatures. Examination of the without-dam temperature estimates indicated that dam sites could be grouped according to the amount of streamflow derived from high-elevation, spring-fed, and snowmelt-driven areas high in the Cascade Mountains (Cougar, Big Cliff/Detroit, River Mill, and Hills Creek Dams: Group A), as opposed to flow primarily derived from lower-elevation rainfall-driven drainages (Group B). Annual maximum temperatures for Group A ranged from 15 to 20 degree(s)C, expressed as the 7-day average of the daily maximum (7dADM), whereas annual maximum 7dADM temperatures for Group B ranged from 21 to 25 degrees C. Because summertime stream temperature is at least somewhat dependent on the upstream water source, it was important when estimating without-dam temperatures to use correlations to sites with similar upstream characteristics. For that reason, it also is important to maintain long-term, year-round temperature measurement stations at representative sites in each of the Willamette River basin's physiographic regions. Streamflow and temperature estimates downstream of the major dam sites and throughout the Willamette River were generated using existing CE-QUAL-W2 flow and temperature models. These models, originally developed for the Willamette River water-temperature Total Maximum Daily Load process, required only a few modifications to allow them to run under the greatly reduced without-dam flow conditions. Model scenarios both with and without upstream dams were run. Results showed that Willamette River streamflow without upstream dams was reduced to levels much closer to historical pre-dam conditions, with annual minimum streamflows approximately one-half or less of dam-augmented levels. Thermal effects of the dams varied according to the time of year, from cooling in mid-summer to warm

  11. Effects of Mitigation Measures on Productivity of the White Sturgeon Populations in the Columbia River Downstream from McNary Dam, and Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1992-1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beamesdorfer, Raymond C.; Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-12-01

    We report on our progress from April 1992-March 1993 in research on white sturgeon in the lower Columbia River. The study began in July 1986 and progress through 1992 was summarized in a comprehensive report in 2 volumes (Beamesderfer and Nigro 1993a, 1993b). This report details activities during the first year of Phase II of this sturgeon research. In Phase I, we assessed the status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam. Phase II will examine the effects on white sturgeon productivity of mitigative measures recommended in Phase I. The status and habitat requirements of white sturgeon populations upstream from McNary Dam will also be examined in Phase II. The study is a cooperative effort by the Oregon Department of Fish and Wildlife, Washington Department of Fisheries, U.S. Fish and Wildlife Service, and National Marine Fisheries Service. Work during the past year has focused on: (1) analysis of results of limited sampling conducted in 1992, (2) submission of Phase I results to the peer-review literature to ensure widespread dissemination, clarity of presentation, and credibility of findings, and (3) preparations for additional field work in 1993. In report sections A to D, each agency reports 1992 results if applicable and the current status of manuscripts. Results of field work conducted in 1993 will be reported in the 1994 annual report.

  12. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This paper summarizes the conclusions of the annual inspections of French dams in operation (fissures, water oozing, concrete swelling etc..). Only the observations which require a special attention are reported. (J.S.)

  13. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  14. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  15. FY2011 Annual Progress Report for Propulsion Materials

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Patrick B. [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Schutte, Carol L. [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Gibbs, Jerry L. [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2011-12-01

    Annual Progress Report for Propulsion Materials focusing on enabling and innovative materials technologies that are critical in improving the efficiency of advanced engines by providing enabling materials support for combustion, hybrid, and power electronics development.

  16. Workforce Training and Economic Development Fund: 2015 Annual Progress Report

    Science.gov (United States)

    Iowa Department of Education, 2015

    2015-01-01

    The Department of Education, Division of Community Colleges, will annually provide the State Board of Education with The Workforce Training and Economic Development (WTED) Fund Annual Progress Report. Administration and oversight responsibility for the fund was transferred from the Iowa Economic Development Authority to the Iowa Department of…

  17. Dams. Bulletin of the technical service of electric power and big dams; Barrages. Bulletin du service technique de l`energie electrique et des grands barrages

    Energy Technology Data Exchange (ETDEWEB)

    Davard, J.

    1997-12-31

    The Dams bulletin reports on technical news concerning big French dams in operation. This issue comprises 5 papers. Two of them are examples of granting problems which led to the dismantling of the dams of Kernansquillec (Cotes d`Armor, France) and Maisons-Rouges (Indre-et-Loire, France) for economical and environmental reasons. The 3 other papers concern the life of French dams (technical control reports of the French dams in operation), the activities of the control service (annual inspections, preparation of draining operations, renewing of granting), and some general information (organisation of competent authorities, colloquium reports, hydro-power production during the first quarter of 1997). (J.S.)

  18. Dam! Dam! Dam!

    International Nuclear Information System (INIS)

    McCully, P.

    1997-01-01

    The author of ''Silenced Rivers'' a book questioning the desirability of dam building and hydroelectric power generation argues the main themes of his book in this paper. Despite being hailed by politicians as good solutions to power generation problems, and enthusiastically pursued in China, the U.S.A., the former Soviet Union, India and Japan, dams have far-reaching ecological and human consequences. The ecosystems lost to flooding, and the agricultural land use lost, the human cost in terms of homes and employment lost to reservoirs, disease from water-borne infections such as malaria, and the hazards of dams overflowing or breaking are all factors which are against the case for dam construction. The author argues the hydroelectric power may be renewable, but the social, agricultural and ecological costs are too high to justify it as a method of first choice. (UK)

  19. Dams. Bulletin of the Technical Service of Electric Power and Big Dams; Barrages. Bulletin du Service Technique de l`Energie Electrique et des Grands Barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Four papers were selected in this issue of the bulletin of the Technical Service of Electric Power and Big Dams. The first one concerns the `Catastrophe Medicine` congress which took place in Amiens (France) in December 5 to 7 1996 and during which the analysis of experience feedbacks and lessons gained after dam accidents and organisation of emergency plans was discussed. The second one is a report of the conclusions of the decennial and annual inspections of French dams. The third paper describes the reinforcement of the Lavaud-Gelade dam embankment and the last paper reports on the Control Services activities concerning the French dams in operation for the forth quarter of the year 1996. (J.S.)

  20. FY2014 Fuel & Lubricant Technologies Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Stork, Kevin [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2016-02-01

    Annual progress report for Fuel & Lubricant Technologies. The Fuel & Lubricant Technologies Program supports fuels and lubricants research and development (R&D) to provide vehicle manufacturers and users with cost-competitive options that enable high fuel economy with low emissions, and contribute to petroleum displacement.

  1. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  2. Hydrological impact of high-density small dams in a humid catchment, Southeast China

    Science.gov (United States)

    Lu, W.; Lei, H.; Yang, D.

    2017-12-01

    The Jiulong River basin is a humid catchment with a drainage area of 14,741 km2; however, it has over 1000 hydropower stations within it. Such catchment with high-density small dams is scarce in China. Yet few is known about the impact of high-density small dams on streamflow changes. To what extent the large number of dams alters the hydrologic patterns is a fundamental scientific issue for water resources management, flood control, and aquatic ecological environment protection. Firstly, trend and change point analyses are applied to determine the characteristics of inter-annual streamflow. Based on the detected change point, the study period is divided into two study periods, the ``natural'' and ``disturbed'' periods. Then, a geomorphology-based hydrological model (GBHM) and the fixing-changing method are adopted to evaluate the relative contributions of climate variations and damming to the changes in streamflow at each temporal scale (i.e., from daily, monthly to annual). Based on the simulated natural streamflow, the impact of dam construction on hydrologic alteration and aquatic ecological environment will be evaluated. The hydrologic signatures that will be investigated include flood peak, seasonality of streamflow, and the inter-annual variability of streamflow. In particular, the impacts of damming on aquatic ecological environment will be investigated using eco-flow metrics and indicators of hydrologic alteration (IHA) which contains 33 individual streamflow statistics that are closely related to aquatic ecosystem. The results of this study expect to provide a reference for reservoir operation considering both ecological and economic benefits of such operations in the catchment with high-density dams.

  3. Southeastern Community College Annual Progress Report, December 1995.

    Science.gov (United States)

    Gardner, R. Gene

    Presenting information on the status of Southeastern Community College (SCC), in Iowa, this annual progress report highlights basic institutional data, financial information, and improvements and planned changes of the college as of 1995. Part 1 presents basic data on SCC, including facility locations, assessed property valuation, district…

  4. Methods to estimate annual mean spring discharge to the Snake River between Milner Dam and King Hill, Idaho

    Science.gov (United States)

    Kjelstrom, L.C.

    1995-01-01

    Many individual springs and groups of springs discharge water from volcanic rocks that form the north canyon wall of the Snake River between Milner Dam and King Hill. Previous estimates of annual mean discharge from these springs have been used to understand the hydrology of the eastern part of the Snake River Plain. Four methods that were used in previous studies or developed to estimate annual mean discharge since 1902 were (1) water-budget analysis of the Snake River; (2) correlation of water-budget estimates with discharge from 10 index springs; (3) determination of the combined discharge from individual springs or groups of springs by using annual discharge measurements of 8 springs, gaging-station records of 4 springs and 3 sites on the Malad River, and regression equations developed from 5 of the measured springs; and (4) a single regression equation that correlates gaging-station records of 2 springs with historical water-budget estimates. Comparisons made among the four methods of estimating annual mean spring discharges from 1951 to 1959 and 1963 to 1980 indicated that differences were about equivalent to a measurement error of 2 to 3 percent. The method that best demonstrates the response of annual mean spring discharge to changes in ground-water recharge and discharge is method 3, which combines the measurements and regression estimates of discharge from individual springs.

  5. Low flow characteristics of river Notwane at Gaborone Dam ...

    African Journals Online (AJOL)

    ... dam has been undertaken using daily flow records between 1979 and 1999 to determine the magnitude of annual maximum deficit volumes and deficit durations at a threshold level equivalent to 75 % dependable flow. Statistical modeling of these annual maximum values, separately, using a PWM/L-moment procedure, ...

  6. Dams. Bulletin of the Technical Service of Electric Power and Big Dams; Barrages. Bulletin du Service Technique de l`Energie Electrique et des Grands Barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Three papers were selected in this issue of the bulletin of the Technical Service of Electric Power and Big Dams. The first one concerns the experience feedback gained from the accident of the Drac river near Grenoble (France) due to a spillover at the Notre-Dame-de-Commiers` dam and which led to the death of 6 children and their teacher. The second one is a report of the conclusions of decennial and annual safety inspections of French dams, while the third one is a report of the Control Services activities for the third quarter of the year 1996 concerning the French dams in operation. (J.S.)

  7. Dam Design can Impede Adaptive Management of Environmental Flows: A Case Study from the Opuha Dam, New Zealand

    Science.gov (United States)

    Lessard, JoAnna; Murray Hicks, D.; Snelder, Ton H.; Arscott, David B.; Larned, Scott T.; Booker, Doug; Suren, Alastair M.

    2013-02-01

    The Opuha Dam was designed for water storage, hydropower, and to augment summer low flows. Following its commissioning in 1999, algal blooms (dominated first by Phormidium and later Didymosphenia geminata) downstream of the dam were attributed to the reduced frequency and magnitude of high-flow events. In this study, we used a 20-year monitoring dataset to quantify changes associated with the dam. We also studied the effectiveness of flushing flows to remove periphyton from the river bed. Following the completion of the dam, daily maximum flows downstream have exceeded 100 m3 s-1 only three times; two of these floods exceeded the pre-dam mean annual flood of 203 m3 s-1 (compared to 19 times >100 m3 s-1 and 6 times >203 m3 s-1 in the 8 years of record before the dam). Other changes downstream included increases in water temperature, bed armoring, frequency of algal blooms, and changes to the aquatic invertebrate community. Seven experimental flushing flows resulted in limited periphyton reductions. Flood wave attenuation, bed armoring, and a shortage of surface sand and gravel, likely limited the effectiveness of these moderate floods. Floods similar to pre-dam levels may be effective for control of periphyton downstream; however, flushing flows of that magnitude are not possible with the existing dam infrastructure. These results highlight the need for dams to be planned and built with the capacity to provide the natural range of flows for adaptive management, particularly high flows.

  8. 10 CFR 905.14 - Does Western require annual IRP progress reports?

    Science.gov (United States)

    2010-01-01

    ... Section 905.14 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.14 Does Western require annual IRP progress reports? Yes, customers must submit IRP progress... projected goals and implementation schedules, and energy and capacity benefits and renewable energy...

  9. Dam spills and fishes

    International Nuclear Information System (INIS)

    1996-01-01

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.)

  10. Evaluation of the Biological Effects of the Northwest Power Conservation Council's Mainstem Amendment on the Fisheries Upstream and Downstream of Libby Dam, Montana, 2007-2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sylvester, Ryan; Stephens, Brian; Tohtz, Joel [Montana Fish, Wildlife & Parks

    2009-04-03

    A new project began in 2005 to monitor the biological and physical effects of improved operations of Hungry Horse and Libby Dams, Montana, called for by the Northwest Power and Conservation Council (NPCC) Mainstem Amendment. This operating strategy was designed to benefit resident fish impacted by hydropower and flood control operations. Under the new operating guidelines, July through September reservoir drafts will be limited to 10 feet from full pool during the highest 80% of water supply years and 20 feet from full pool during the lowest 20% of water supply (drought) years. Limits were also established on how rapidly discharge from the dams can be increased or decreased depending on the season. The NPCC also directed the federal agencies that operate Libby and Hungry Horse Dams to implement a new flood control strategy (VARQ) and directed Montana Fish, Wildlife & Parks to evaluate biological responses to this operating strategy. The Mainstem Amendment operating strategy has not been fully implemented at the Montana dams as of June 2008 but the strategy will be implemented in 2009. This report highlights the monitoring methods used to monitor the effects of the Mainstem Amendment operations on fishes, habitat, and aquatic invertebrates upstream and downstream of Libby Dam. We also present initial assessments of data and the effects of various operating strategies on physical and biological components of the systems upstream and downstream of Libby Dam. Annual electrofishing surveys in the Kootenai River and selected tributaries, along with gill net surveys in the reservoir, are being used to quantify the impacts of dam operations on fish populations upstream and downstream of Libby Dam. Scales and otoliths are being used to determine the age structure and growth of focal species. Annual population estimates and tagging experiments provide estimates of survival and growth in the mainstem Kootenai River and selected tributaries. Radio telemetry will be used to

  11. Olympic dam expansion - a clear future for uranium

    International Nuclear Information System (INIS)

    Hunt, G.

    2008-01-01

    After BHP Billiton's acquisition of Olympic Dam in northern South Australia in 2005, an important early decision was to undertake a major drilling campaign to better define the resource. Between 2005 and 2007, the drilling almost doubled the resource. BHP Billiton's 2007 annual report indicated the Olympic Dam mineral resource estimate is 7.855 B dry metric tonnes at metal grades of 0.86% Copper, 0.29 kg per tonne Uranium Oxide, 0.3 g/t Gold and 1.6 g/t Silver.

  12. Sediment budget as affected by construction of a sequence of dams in the lower Red River, Viet Nam

    Science.gov (United States)

    Lu, Xi Xi; Oeurng, Chantha; Le, Thi Phuong Quynh; Thuy, Duong Thi

    2015-11-01

    Dam construction is one of the main factors resulting in riverine sediment changes, which in turn cause river degradation or aggradation downstream. The main objective of this work is to examine the sediment budget affected by a sequence of dams constructed upstream in the lower reach of the Red River. The study is based on the longer-term annual data (1960-2010) with a complementary daily water and sediment data set (2008-2010). The results showed that the stretch of the river changed from sediment surplus (suggesting possible deposition processes) into sediment deficit (possible erosion processes) after the first dam (Thac Ba Dam) was constructed in 1972 and changed back to deposition after the second dam (Hoa Binh Dam) was constructed in 1985. The annual sediment deposition varied between 1.9 Mt/y and 46.7 Mt/y with an annual mean value of 22.9 Mt/y (1985-2010). The sediment deposition at the lower reach of the Red River would accelerate river aggradation which would change river channel capacity in the downstream of the Red River. The depositional processes could be sustained or changed back to erosional processes after more dams (the amount of sediment deposit was much less after the latest two dams Tuyen Quang Dam in 2009 and Sonla Dam in 2010) are constructed, depending on the water and sediment dynamics. This study revealed that the erosional and depositional processes could be shifted for the same stretch of river as affected by a sequence of dams and provides useful insights in river management in order to reduce flood frequency along the lower reach of the Red River.

  13. Defining ecological and economical hydropoweroperations: a framework for managing dam releasesto meet multiple conflicting objectives

    Science.gov (United States)

    Irwin, Elise R.

    2014-01-01

    Hydroelectric dams are a flexible source of power, provide flood control, and contribute to the economic growth of local communities through real-estate and recreation. Yet the impoundment of rivers can alter and fragment miles of critical riverine habitat needed for other competing needs such as downstream consumptive water use, fish and wildlife population viability, or other forms of recreation. Multiple conflicting interests can compromise progressive management especially with recognized uncertainties related to whether management actions will fulfill the objectives of policy makers, resource managers and/or facility owners. Decision analytic tools were used in a stakeholder-driven process to develop and implement a template for evaluation and prediction of the effects of water resource management of multiple-use systems under the context provided by R.L. Harris Dam on the Tallapoosa River, Alabama, USA. The approach provided a transparent and structured framework for decision-making and incorporated both existing and new data to meet multiple management objectives. Success of the template has been evaluated by the stakeholder governing body in an adaptive resource management framework since 2005 and is ongoing. Consequences of management of discharge at the dam were evaluated annually relative to stakeholder satisfaction to allow for adjustment of both management scenarios and objectives. This template can be applied to attempt to resolve conflict inherent in many dam-regulated systems where management decisions impact diverse values of stakeholders.

  14. Enloe Dam Passage Project, Volume I, 1984 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fanning, M.L.

    1985-07-01

    This report discusses issues related to the provision of fish passage facilities at Enloe Dam and the introduction of anadromous salmonid fish to the upper Similkameen River basin. The species of fish being considered is a summer run of steelhead trout adapted to the upper Columbia basin. (ACR)

  15. Florida Progress Corporation 1991 annual report

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Florida Progress Corporation is a utility holding company with assets of 5 billion dollars. Its principal subsidiary is the Florida Power Corporation; others are the Electric Fuels Corporation, the Mid-Continent Life Assurance Company, the Talquin Corporation, the Progress Credit Corporation and Advanced Separation Technologies Incorporated. The annual report describes achievements during the year. To meet growing energy demand Florida Power is building new peaking and base-load generating units, purchasing power from neighbouring utilities and cogenerators, and building more bulk power transmission line capacity in the state. Emphasis has been placed on meeting load growth by demand-site management. Attention is given to balancing energy needs with concerns for the environment, and there is an award-winning recycling program. The Electric Fuels Corporation major area of business is coal mining and transportation services. Advanced Separation Technologies has sold several of its patented ion separation machines. The report includes consolidated financial statements for the year ended 31 December 1991

  16. Negligible contribution of reservoir dams to organic and inorganic transport in the lower Mimi River, Japan

    Science.gov (United States)

    Nukazawa, Kei; Kihara, Kousuke; Suzuki, Yoshihiro

    2017-12-01

    Rivers fulfill an essential ecological role by forming networks for material transport from upland forests to coastal areas. The way in which dams affect the organic and inorganic cycles in such systems is not well understood. Herein, we investigated the longitudinal profiles of the various components of the water chemistry across three cascade dams in Japan: the Yamasubaru Dam, Saigou Dam, and Ohuchibaru Dam, which are situated along the sediment-productive Mimi River in different flow conditions. We analyzed the following water quality components: suspended solids (SS), turbidity, total iron (TFe), dissolved iron (DFe), total organic carbon (TOC), total nitrogen (TN), total phosphorus (TP), humic substance (HS), and major ionic components (Na+, Mg2+, Ca2+, Cl-, NO3-, and SO42-) in the downstream channels of the three dams during the low-intermediate-flow and high-flow events from 2012 to 2014. We estimated hourly loads of each component using hourly turbidity data and discharge data (i.e., L-Q model) separately, and the results are integrated to estimate the annual fluxes. The annual fluxes between the methods were compared to verify predictability of the conventional L-Q models. Annual flux of TOC, TN, DFe, and HS estimated by the turbidity displayed similar values, whereas the flux of SS, TFe, and TP tended to increase downstream of the dams. Among the dams, estimated flux proportions for TP and TFe were higher during high-flow events (74%-94%). Considering geographic conditions (e.g., absence of major tributary between the dams), the result implies that accumulated TP and TFe in the reservoirs may be flushed and transported downstream with SS over the short height dams during flood events. Assuming this process, the reservoir dams probably make only a fractional contribution to the organic and inorganic transport in the catchment studied. The percent flux errors for SS, TFe, and TP fluxes ranged from -7.2% to -97% (except for the TP flux in 2013), which

  17. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kern, J. Chris; Ward, David L.; Farr, Ruth A. (Oregon Department of Fish and Wildlife)

    2002-02-01

    We report on our progress from April 2000 through March 2001 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), the U.S. Fish and Wildlife Service (USFWS; Report E), and Oregon State University (OSU; Report F). This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 2000 through March 2001 are listed.

  18. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam, 1999-2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    2001-04-01

    We report on our progress from April 1999 through March 2000 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), and the U.S. Fish and Wildlife Service (USFWS; Report E). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1999 through March 2000 are given.

  19. White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 1998-1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L.

    2000-12-01

    The authors report on their progress from April 1998 through March 1999 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), U.S. Fish and Wildlife Service (USFWS; Report D), Columbia River Inter-Tribal Fish Commission (CRITFC; Report E), and the University of Idaho (UI; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of our work from April 1998 through March 1999 are given.

  20. Large Dam Effects on Flow Regime and Hydraulic Parameters of river (Case study: Karkheh River, Downstream of Reservoir Dam

    Directory of Open Access Journals (Sweden)

    Farhang Azarang

    2017-06-01

    Full Text Available Introduction: The critical role of the rivers in supplying water for various needs of life has led to engineering identification of the hydraulic regime and flow condition of the rivers. Hydraulic structures such dams have inevitable effects on their downstream that should be well investigated. The reservoir dams are the most important hydraulic structures which are the cause of great changes in river flow conditions. Materials and Methods: In this research, an accurate assessment was performed to study the flow regime of Karkheh river at downstream of Karkheh Reservoir Dam as the largest dam in Middle East. Karkheh River is the third waterful river of Iran after Karun and Dez and the third longest river after the Karun and Sefidrud. The Karkheh Dam is a large reservoir dam built in Iran on the Karkheh River in 2000. The Karkheh Reservoir Dam is on the Karkheh River in the Northwestern Khouzestan Province, the closest city being Andimeshk to the east. The part of Karkheh River, which was studied in this research is located at downstream of Karkheh Reservoir Dam. This interval is approximately 94 km, which is located between PayePol and Abdolkhan hydrometric stations. In this research, 138 cross sections were used along Karkheh River. Distance of cross sections from each other was 680m in average. The efficient model of HEC-RAS has been utilized to simulate the Karkheh flow conditions before and after the reservoir dam construction using of hydrometric stations data included annually and monthly mean discharges, instantaneous maximum discharges, water surface profiles and etc. Three defined discharges had been chosen to simulate the Karkheh River flow; maximum defined discharge, mean defined discharge and minimum defined discharge. For each of these discharges values, HEC-RAS model was implemented as a steady flow of the Karkheh River at river reach of study. Water surface profiles of flow, hydraulic parameters and other results of flow regime in

  1. Advances in crosshole seismic measurements to characterise and monitor the internal condition of embankment dams

    Energy Technology Data Exchange (ETDEWEB)

    Vazinkhoo, S.; Anderlini, C.; Gaffran, P. [BC Hydro, Burnaby, BC (Canada); Jefferies, M. [Golder Associates Ltd., Vancouver, BC (Canada)

    2008-07-01

    The WAC Bennett Dam Sinkhole investigation project was launched in June 1996 in British Columbia following the discovery of a sinkhole. This paper provided information on crosshole seismic velocity testing that was conducted at the WAC Bennett Dam, along with background information on the methods developed to interpret the results of crosshole seismic testing that has been conducted on an annual basis at the dam since 1996. Additional laboratory and field testing conducted at the Mica and Revelstoke dams were also reviewed with particular focus on how the results have improved the interpretation and assessment methods. This paper described the laboratory testing program which consisted of bender element tests, in which shear wave velocities were measured under controlled void ratio, stress and fines content conditions, and critical state triaxial tests to determine the Critical State Lines (CSLs). It was concluded that crosshole seismic shear wave velocity measurements have proven to be a very useful tool for monitoring void ratio and stress conditions at the WAC Bennett Dam and continue to be employed at the dam on an annual basis. Variations in shear wave velocity can be correlated to local construction features at the WAC Bennett and other BC Hydro dams. 16 refs., 4 tabs., 7 figs.

  2. Value of nuclear energy echoes with Olympic Dam

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Australia's newest uranium mine, Olympic Dam contains 450 million tonnes of economic ore. It has the capacity to annually produce 45,000 tonnes of uranium oxide, 27,000 ounces of gold and 555,000 ounces of silver. The orebody composition and the deposit-wide mineral zonation pattern represents the end product of a complex evolution of a large breccia pipe system. A brief account is given of the mining and metallurgical operations, along with a list of the long term contracts which cover about 50% of Olympic Dam's initial uranium production. 1 tab., ills

  3. Federal Facility Agreement Annual Progress Report for FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E.

    1999-08-04

    This FFA Annual Progress Report has been developed to summarize the information for activities performed during the Fiscal Year 1998 (October 1, 1997, to September 30, 1998) and activities planned for Fiscal Year 1999 by U.S. EPA, SCDHEC, and SRS at those units and areas identified for remediation in the Agreement.

  4. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Brimmer, Arnold F.

    1994-10-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1994 spring outmigration at migrant traps on the Snake River, Clearwater River, and Salmon River. The 1994 snowpack was among the lowest since the beginning of the present drought, and the subsequent runoff was very poor. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1994. Total annual (hatchery + wild) chinook salmon catch at the Snake River trap was 1.5 times greater than in 1993. Hatchery and wild steelhead trout catches were similar to 1993. The Snake River trap collected 30 age 0 chinook salmon. Hatchery chinook salmon catch at the Clearwater River trap was 3.5 times higher than in 1993, and wild chinook salmon catch was 4.2 times higher. Hatchery steelhead trout trap catch was less than half of 1993 numbers because the trap was fishing near the north shore during the majority of the hatchery steelhead movement due to flow augmentations from Dworshak. Wild steelhead trout trap catch was 2 times higher than in 1993. The Salmon River trap was operated for about a month longer in 1994 than in 1993 due to extremely low flows. Hatchery chinook salmon catch was 1.4 times greater in 1994 than the previous year. Wild chinook salmon catch was slightly less in 1994. The 1994 hatchery steelhead trout collection did not change significantly from 1993 numbers. Wild steelhead trout collection in 1994 was 59% of the 1993 catch. Fish tagged with Passive Integrated Transponder (PIT) tags at the Snake River trap were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993, cumulative interrogation data is not comparable with the prior five years (1988-1992).

  5. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  6. Anadromous sea lampreys recolonize a Maine coastal river tributary after dam removal

    Science.gov (United States)

    Hogg, Robert; Coghlan, Stephen M.; Zydlewski, Joseph D.

    2013-01-01

    Sedgeunkedunk Stream, a third-order tributary to the Penobscot River, Maine, historically supported several anadromous fishes, including the Atlantic Salmon Salmo salar, AlewifeAlosa pseudoharengus, and Sea Lamprey Petromyzon marinus. However, two small dams constructed in the 1800s reduced or eliminated spawning runs entirely. In 2009, efforts to restore marine–freshwater connectivity in the system culminated with removal of the lowermost dam, thus providing access to an additional 4.6 km of lotic habitat. Because Sea Lampreys utilized accessible habitat prior to dam removal, they were chosen as a focal species with which to quantify recolonization. During spawning runs of 2008–2011 (before and after dam removal), individuals were marked with PIT tags and their activity was tracked with daily recapture surveys. Open-population mark–recapture models indicated a fourfold increase in the annual abundance of spawning-phase Sea Lampreys, with estimates rising from 59±4 () before dam removal (2008) to 223±18 and 242±16 after dam removal (2010 and 2011, respectively). Accompanying the marked increase in annual abundance was a greater than fourfold increase in nesting sites: the number of nests increased from 31 in 2008 to 128 and 131 in 2010 and 2011, respectively. During the initial recolonization event (i.e., in 2010), Sea Lampreys took 6 d to move past the former dam site and 9 d to expand into the furthest upstream reaches. Conversely, during the 2011 spawning run, Sea Lampreys took only 3 d to penetrate into the upstream reaches, thus suggesting a potential positive feedback in which larval recruitment into the system may have attracted adult spawners via conspecific pheromone cues. Although more research is needed to verify the migratory pheromone hypothesis, our study clearly demonstrates that small-stream dam removal in coastal river systems has the potential to enhance recovery of declining anadromous fish populations.

  7. Olympic Dam operations - environmental management programme

    International Nuclear Information System (INIS)

    1990-03-01

    This is the 3rd Annual Report pertaining to the Olympic Dam Operations Environmental Management Programme and covers the period 1st March, 1989 to 28th February, 1990. The monitoring programe has provided detailed assessment of meteorological data, vegetation, fauna, soil stability, soil salinity, hydrogeology and well-fields both inside and outside the operations area. Mine site rehabilitation is considered to be progressing satisfactorily. Out of the 851 drill pad sites 72% have been rehabilitated to the stage where natural soil stability and plant cover has been achieved. Drill pad sites that have received good rainfall within one year of being ripped have rehabilitated very succesfully. Sites that receive no significant rainfall for more than two years, particularly on dune slopes may require re-ripping before successful regeneration can occur. To improve the drill pad site rehabilitation monitoring programme it is recommended that 200 drill sites be analysed each year. Air emission and solid waste data are also presented. This program is considered to be particularly successful in relation to SO 2 assessment. 90 tabs., 63 figs., ills

  8. 2013 Annual Progress Report: DOE Hydrogen and Fuel Cells Program

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-12-01

    The 2013 Annual Progress Report summarizes fiscal year 2013 activities and accomplishments by projects funded by the DOE Hydrogen Program. It covers the program areas of hydrogen production and delivery; hydrogen storage; fuel cells; manufacturing; technology validation; safety, codes and standards; market transformation; and systems analysis.

  9. 2014 Annual Progress Report: DOE Hydrogen and Fuel Cells Program

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-11-01

    The 2014 Annual Progress Report summarizes fiscal year 2014 activities and accomplishments by projects funded by the DOE Hydrogen Program. It covers the program areas of hydrogen production and delivery; hydrogen storage; fuel cells; manufacturing; technology validation; safety, codes and standards; market transformation; and systems analysis.

  10. 2011 Annual Progress Report: DOE Hydrogen and Fuel Cells Program

    Energy Technology Data Exchange (ETDEWEB)

    Satyapal, Sunita [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2011-11-01

    The 2011 Annual Progress Report summarizes fiscal year 2011 activities and accomplishments by projects funded by the DOE Hydrogen Program. It covers the program areas of hydrogen production and delivery; hydrogen storage; fuel cells; manufacturing; technology validation; safety, codes and standards; education; market transformation; and systems analysis.

  11. Dam's design continues throughout construction

    Energy Technology Data Exchange (ETDEWEB)

    Lara E, R; Wulff, J G

    1979-11-01

    In spite of adverse site conditions, Arenal dam in Costa Rica was completed a year ahead of schedule. Historical data on local earthquake activity which was available in unusual detail reduced some uncertainties in design information. Other uncertainties regarding the complex foundation conditions were resolved as excavation and construction progressed.

  12. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

    2005-01-01

    In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence

  13. Characterization of annual disease progression of multiple sclerosis patients: A population-based study

    DEFF Research Database (Denmark)

    Freilich, Jonatan; Manouchehrinia, Ali; Trusheim, Mark

    2017-01-01

    Previous research characterizing factors influencing multiple sclerosis (MS) disease progression has typically been based on time to disease milestones (Kaplan-Meier, Cox hazard regression, etc.). A limitation of these methods is the handling of the often large groups of patients not reaching...... the milestone. To characterize clinical factors influencing MS disease progression as annual transitions from each Expanded Disability Status Scale (EDSS). The annual progression of 11,964 patients from the Swedish MS Registry was analysed with 10 multinomial logistic regressions, that is, one for transition...... from each full EDSS with explanatory variables age, sex, age at onset, time in current EDSS, highest prior EDSS, MS course and treatment. All factors (except sex) investigated had statistically significant impacts on transitions from at least one EDSS. However, significance and size of the effect...

  14. 2015 Annual Progress Report: DOE Hydrogen and Fuel Cells Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-12-23

    The 2015 Annual Progress Report summarizes fiscal year 2015 activities and accomplishments by projects funded by the DOE Hydrogen and Fuel Cells Program. It covers the program areas of hydrogen production; hydrogen delivery; hydrogen storage; fuel cells; manufacturing R&D; technology validation; safety, codes and standards; systems analysis; and market transformation.

  15. Annual report of waste generation and pollution prevention progress 2000 [USDOE] [9th edition

    International Nuclear Information System (INIS)

    None

    2001-01-01

    This ninth edition of the Annual Report of Waste Generation and Pollution Prevention Progress highlights waste reduction, pollution prevention accomplishments, and cost savings/avoidance for the U.S. Department of Energy (DOE) Pollution Prevention Program for Fiscal Year 2000. This edition marks the first time that progress toward meeting the 2005 Pollution Prevention Goals, issued by the Secretary of Energy in November 1999, is being reported. In addition, the Annual Report has a new format, and now contains information on a fiscal year basis, which is consistent with other DOE reports

  16. Federal Facility Agreement Annual Progress Report for Fiscal Year 1998

    International Nuclear Information System (INIS)

    Palmer, E.

    1999-01-01

    This FFA Annual Progress Report has been developed to summarize the information for activities performed during the Fiscal Year 1998 (October 1, 1997, to September 30, 1998) and activities planned for Fiscal Year 1999 by U.S. EPA, SCDHEC, and SRS at those units and areas identified for remediation in the Agreement

  17. Abstracts and electronic proceedings of the Canadian Dam Association's 2009 annual conference : protecting people, property and the environment; Resumes et actes electroniques du congres annuel 2009 de l'Association canadienne des barrages : proteger les personnes, les biens et l'environnement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    The Canadian Dam Association (CDA) is the Canadian leader in advancing knowledge and practices related to dams. This annual conference provided a professional development opportunity on a broad range of dam-related topics. The technical sessions addressed issues such as adaptation to climate change; the application of safety design for discharge facilities; risks associated with rockfill dams; underlying problems of design floods and dam safety; guidelines for public safety around dams and psychology of safety; the dam safety review process; and run-of-river hydro dams. During the related sessions, Canadian members of the International Committee on Large Dams (ICOLD) commented on international practice and developments. The workshops focused on incident investigations; reliability-centered maintenance; flow discharge gate reliability; piping damage to till core dams; and mining dams. The sessions of the conference were entitled: design floods and dam safety; dam breach flood modelling; dam safety management; public safety; mining dams; flood handling and modelling; case studies; ice loads on structures; seepage control; dam safety reviews and remediation; remote sensing for dams; protecting the environment; seismic hazard and response modelling; and the performance of dams in 2008 earthquake in Sichuan, China. The conference featured 61 presentations, of which 59 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  18. How Physical Processes are Informing River Management Actions at Marble Bluff Dam, Truckee River, Nevada

    Science.gov (United States)

    Bountry, J.; Godaire, J.; Bradley, D. N.

    2017-12-01

    At the terminus of the Truckee River into Pyramid Lake (Nevada, USA), upstream river management actions have dramatically reshaped the river landscape, posing significant challenges for the management of endangered aquatic species and maintenance of existing infrastructure. Within the last 100 years, upstream water withdrawal for human uses has resulted in a rapid lowering of Pyramid Lake which initiated up to 90 ft of channel incision. In 1976 Marble Bluff Dam was constructed to halt the upstream progression of channel incision and protect upstream agricultural lands, tribal resources, and infrastructure. Since construction an additional 40 ft of lake lowering and subsequent channel lowering now poses a potential risk to the structural integrity of the dam. The dynamic downstream river combined with ongoing reservoir sedimentation pose challenges to fish passage facilities that enable migration of numerous endangered cui-ui and threatened Lahontan Cutthroat Trout (LCT) to upstream spawning areas each year. These facilities include a fish lock at the dam, a fish bypass channel which allows fish to avoid the shallow delta area during low lake levels, and a meandering channel constructed by the Nature Conservancy to connect the bypass channel to the receding Pyramid Lake. The reservoir formed by Marble Bluff Dam has completely filled with sediment which impacts fish passage facilities. The original operating manual for the dam recommends year-round flushing of sediment through radial gates, but this can no longer be accomplished. During critical fish migration periods in the spring operators must ensure fish entrance channels downstream of the dam are not buried with released sediment and fish are not trapped in a portion of the reservoir full of sediment that would risk sending them back over the dam. To help inform future reservoir sediment and infrastructure management strategies, we bracket a range of potential river responses to lake level lowering and floods

  19. Feasibility of groundwater recharge dam projects in arid environments

    Science.gov (United States)

    Jaafar, H. H.

    2014-05-01

    A new method for determining feasibility and prioritizing investments for agricultural and domestic recharge dams in arid regions is developed and presented. The method is based on identifying the factors affecting the decision making process and evaluating these factors, followed by determining the indices in a GIS-aided environment. Evaluated parameters include results from field surveys and site visits, land cover and soils data, precipitation data, runoff data and modeling, number of beneficiaries, domestic irrigation demand, reservoir objectives, demography, reservoirs yield and reliability, dam structures, construction costs, and operation and maintenance costs. Results of a case study on more than eighty proposed dams indicate that assessment of reliability, annualized cost/demand satisfied and yield is crucial prior to investment decision making in arid areas. Irrigation demand is the major influencing parameter on yield and reliability of recharge dams, even when only 3 months of the demand were included. Reliability of the proposed reservoirs as related to their standardized size and net inflow was found to increase with increasing yield. High priority dams were less than 4% of the total, and less priority dams amounted to 23%, with the remaining found to be not feasible. The results of this methodology and its application has proved effective in guiding stakeholders for defining most favorable sites for preliminary and detailed design studies and commissioning.

  20. 2016 Annual Progress Report: DOE Hydrogen and Fuel Cells Program

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-03-09

    The 2016 Annual Progress Report summarizes fiscal year 2016 activities and accomplishments by projects funded by the DOE Hydrogen and Fuel Cells Program. It covers the program areas of hydrogen production; hydrogen delivery; hydrogen storage; fuel cells; manufacturing R&D; technology validation; safety, codes and standards; systems analysis; market transformation; and Small Business Innovation Research projects.

  1. Perfection of design of soil dams of small hydroelectric power stations

    International Nuclear Information System (INIS)

    Inoyatov, M.B.; Rasulov, S.

    2008-01-01

    The important question connected with building of dams of smallhydroelectric power stations in rock conditions is water filtration throughthe side of dam containing as a rule the alluvial material. This process canbe accompanied by internal erosion long-term exposure of which lead tocarry-over more bigger particles with progressive increasing permeabilitytill catastrophic level. This question authors consider in this article

  2. Dam spills and fishes; Eclusees et poissons

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.).

  3. Fusion Energy Division annual progress report period ending December 31, 1986

    Energy Technology Data Exchange (ETDEWEB)

    Morgan, O.B. Jr.; Berry, L.A.; Sheffield, J.

    1987-10-01

    This annual report on fusion energy discusses the progress on work in the following main topics: toroidal confinement experiments; atomic physics and plasma diagnostics development; plasma theory and computing; plasma-materials interactions; plasma technology; superconducting magnet development; fusion engineering design center; materials research and development; and neutron transport. (LSP)

  4. Fusion Energy Division annual progress report period ending December 31, 1986

    International Nuclear Information System (INIS)

    Morgan, O.B. Jr.; Berry, L.A.; Sheffield, J.

    1987-10-01

    This annual report on fusion energy discusses the progress on work in the following main topics: toroidal confinement experiments; atomic physics and plasma diagnostics development; plasma theory and computing; plasma-materials interactions; plasma technology; superconducting magnet development; fusion engineering design center; materials research and development; and neutron transport

  5. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  6. MacDonald Dam reconstruction : using roller-compacted concrete

    Energy Technology Data Exchange (ETDEWEB)

    O' Neil, E. [AMEC Earth and Environmental Ltd., Sydney, NS (Canada)

    2007-04-01

    Located in Nova Scotia, the MacDonald Dam was commissioned in 1928. The dam consists of a 122 metre-long, 16 metre-high concrete structure comprised of an intake structure, stoplog openings, and a 34 metre-long free-overflow spillway. A 488 metre-long power canal was added as an upgrade in the 1950s. This paper provided details of the roller-compact concrete (RCC) used in the dam's recent rehabilitation following a dam failure analysis in 2003 by Nova Scotia Power Inc. RCC was chosen to help keep the dam's construction project on schedule. The layout and cross-section of the spillway was selected with consideration given to the RCC placing operation. A lift thickness of 0.20 m was selected. A formed ogee crest consisting of conventional reinforced concrete was constructed on top of the RCC. The downstream steps of the spillway were also covered with cast-in-place concrete. A low level sluice was designed to resist the weight of the wet RCC. The design compressive strength of the RCC was 20 MPa. The forms used to support the cast-in-place facing concrete on the upstream face of the dam were constructed full height and were braced back to the downstream face of the existing concrete structure prior to the start of RCC placement. Formwork inserts were placed in the facing concrete as construction progressed. Crack inducers were pre-placed on the forms. Aggregates from a local source were transported to a pug mill as the RCC construction progressed. The RCC was spread into 0.20 m lifts using a small bull-dozer, and the facing concrete was vibrated into the lift below. RCC lifts were compacted using a 9 tonne vibratory drum roller. The RCC placing operation was completed over a period of 10 days. Following the completion of the RCC portion of the dam, the remainder of the cast-in-place concrete was completed. It was concluded that the RCC provided a durable, low-maintenance structure that was completed at a lower price and in a shorter time-frame than

  7. The Politics, Development and Problems of Small Irrigation Dams in Malawi: Experiences from Mzuzu ADD

    Directory of Open Access Journals (Sweden)

    Bryson Gwiyani Nkhoma

    2011-10-01

    Full Text Available The paper examines the progress made regarding the development of small irrigation dams in Malawi with the view of establishing their significance in improving rural livelihoods in the country. The paper adopts a political economy theory and a qualitative research approach. Evidence from Mzuzu Agricultural Development Division (ADD, where small reservoirs acquire specific relevance, shows that despite the efforts made, the development of small dams is making little progress. The paper highlights that problems of top-down planning, high investment costs, negligence of national and local interests, over-dependency on donors, and conflicts over the use of dams – which made large-scale dams unpopular in the 1990s – continue to affect the development of small irrigation dams in Malawi. The paper argues that small irrigation dams should not be simplistically seen as a panacea to the problems of large-scale irrigation dams. Like any other projects, small dams are historically and socially constructed through interests of different actors in the local settings, and can only succeed if actors, especially those from formal institutions, develop adaptive learning towards apparent conflicting relations that develop among them in the process of implementation. In the case of Mzuzu ADD, it was the failure of the government to develop this adaptive learning to the contestations and conflicts among these actors that undermined successful implementation of small irrigation dams. The paper recommends the need to consider local circumstances, politics, interests, rights and institutions when investing in small irrigation dams.

  8. Crosshole seismic measurements to characterise and monitor the internal condition of embankment dams

    Energy Technology Data Exchange (ETDEWEB)

    Vazinkhoo, S. [Horizon Engineering Inc., North Vancouver, BC (Canada); Gaffran, P. [BC Hydro, Burnaby, BC (Canada)

    2002-12-01

    A sinkhole was discovered at the Bennett Dam in June 1996. The discovery was immediately followed by an investigation consisting 14 geophysical techniques, of which crosshole seismic testing was the most successful. The Bennett Dam Sinkhole Investigation Project resulted in remedial action which involved compaction grouting to repair the defects. Crosshole seismic testing has been carried out annually since 1996 to verify that the integrity of the repaired zone is being maintained. Large amounts of data have been collected since initial testing to augment other acquired data from more conventional geotechnical techniques. Both data sets have provided a unique opportunity to correlate seismic velocities to mechanical soil properties. The condition of the dam can now be readily assessed through the prediction of seismic velocities for a range of soil properties at any point in the dam. The study has resulted in a better understanding of measured velocities with respect to dam behaviour. Results confirm that seismic velocity testing is a useful, non-intrusive tool for monitoring the performance of embankment dams. 13 refs., 2 tabs., 8 figs.

  9. StreamNet: FY 1999 annual progress report

    International Nuclear Information System (INIS)

    Columbia River Inter-Tribal Fish Commission

    2000-01-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The views of this report are the author's and do not necessarily represent the views of BPA. This annual report covers progress made by: Columbia River Inter-Tribal Fish Commission Idaho; Department of Fish and Game; Montana Department of Fish, Wildlife and Parks; Oregon Department of Fish and Wildlife; Pacific States Marine Fisheries Commission; Shoshone-Bannock Tribes; US Fish and Wildlife Service; Washington Department of Fish and Wildlife; and FY1999 StreamNet Quickplan

  10. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  11. Evaluation of the Hydropower Generation Potential of a Dam Using Optimization Techniques: Application to Doma Dam, Nassarawa, in North Central Nigeria

    Directory of Open Access Journals (Sweden)

    Salami Adebayo Wahab

    2017-03-01

    Full Text Available Optimization models have been developed to maximize annual energy generation from the Doma dam, subject to the constraint of releases for irrigation, ecological purposes, the water supply, the maximum yield from the reservoir and reservoir storage. The model was solved with LINGO software for various mean annual inflow exceedence probabilities. Two scenarios of hydropower retrofitting were considered. Scenario 1, with the reservoir inflows at 50%, 75%, and 90% probabilities of exceedence, gives the total annual hydropower as 0.531 MW, 0.450 MW and 0.291 MW, respectively. The corresponding values for scenario 2 were 0.615 MW, 0.507 MW, and 0.346 MW respectively. The study also considered increasing the reservoir’s live storage to 32.63Mm3 by taking part of the flood storage so that the maximum draft increases to 7 Mm3. With this upper limit of storage and draft with reservoir inflows of 50%, 75% and 90% probabilities of exceedence, the hydropower generated increased to 0.609 MW, 0.540 MW, and 0.347 MW respectively for the scenario 1 arrangement, while those of scenario 2 increased to 0.699 MW, 0.579MW and 0.406 MW respectively. The results indicate that the Doma Dam is suitable for the production of hydroelectric power and that its generation potential is between 0.61 MW and 0.70 MW.

  12. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  13. Advances in crosshole seismic instrumentation for dam safety monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Anderlini, G.; Anderlini, C. [BC Hydro, Burnaby, BC (Canada); Taylor, R. [RST Instruments Ltd., Coquitlam, BC (Canada)

    2009-07-01

    Since 1996, crosshole shear wave velocity measurements have been performed annually at the WAC Bennett Dam in order to monitor the performance of the dam core and integrity of the 1997 sinkhole repairs. As the testing showed to be responsive to embankment conditions and capable of detecting subtle changes, the testing program was expanded to include the development of an electrical shear wave source capable of carrying out crosshole seismic testing in Mica and Revelstoke Dams over distances of 100 metres and depths of 250 metres. This paper discussed the development and capabilities of the crosshole seismic instrumentation and presented preliminary results obtained during initial testing. Specific topics that were discussed included conventional crosshole seismic equipment; design basics; description of new crosshole seismic equipment; and automated in-situ crosshole seismic system (ACSS) system description and operation. It was concluded that the ACSS and accompanying electrical shear wave source, developed as part of the project, has advanced and improved on traditional crosshole seismic equipment. 7 refs., 9 figs.

  14. FY2011 Annual Progress Report for Advanced Combustion Engine Research and Development

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-12-01

    Annual Progress Report for the Advanced Combustion Engine Research and Development (R&D) subprogram supporting the mission of the Vehicle Technologies Program by removing the critical technical barriers to commercialization of advanced internal combustion engines (ICEs) for passenger and commercial vehicles that meet future federal emissions regulations.

  15. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka during the 2002 spring out-migration at migrant traps on the Snake River and Salmon River. In 2002 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 11.4 times greater in 2002 than in 2001. The wild Chinook catch was 15.5 times greater than the previous year. Hatchery steelhead trout catch was 2.9 times greater than in 2001. Wild steelhead trout catch was 2.8 times greater than the previous year. The Snake River trap collected 3,996 age-0 Chinook salmon of unknown rearing. During 2002, the Snake River trap captured 69 hatchery and 235 wild/natural sockeye salmon and 114 hatchery coho salmon O. kisutch. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. The significant increase in catch in 2002 was due to a 3.1 fold increase in hatchery Chinook production and a more normal spring runoff. Trap operations began on March 10 and were terminated on June 7. The trap was out of operation for a total of four days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 4.2 times greater and wild Chinook salmon catch was 2.4 times greater than in 2001. The hatchery steelhead trout collection in 2002 was 81% of the 2001 numbers. Wild steelhead trout collection in 2002 was 81% of the previous year's catch. Trap operations began on March 10 and were terminated on May 29 due to high flows. The trap was out of operation for four days due to high flow or debris. The

  16. Community involvement in dam breach exercises

    International Nuclear Information System (INIS)

    Cattanach, J.D.; Macdonald, E.G.; Mulligan, K.M.

    1993-01-01

    In 1986 British Columbia Hydro made a commitment to perform annual dam failure simulations based on the Emergency Preparedness Plans. Over the last 7 years nine such exercises have been completed. Each year the level of complexity of the exercises has increased, and along with it, the number of organizations outside of B.C. Hydro that participate in the exercise events has also increased. There has been a shift in attitudes, both internally and externally, towards these exercises. It is described how British Columbia Hydro was able to involve the communities downstream of its dams and encourage their participation in emergency planning and coordination. B.C. Hydro's process for involving a community in its emergency exercises starts with an invitation to the emergency coordinator in each affected community to attend an exercise planning meeting. Communities have occasionally declined to participate, the most common reasons being insufficiently developed emergency plans, budget prohibiting the cost of the exercise, or for political reasons. 2 refs., 1 tab

  17. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  18. Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2002-09-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

  19. Annual report on reactor safety research projects. Reporting period 2011. Progress report

    International Nuclear Information System (INIS)

    2011-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  20. Annual report on reactor safety research projects. Reporting period 2014. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-07-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. lt has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  1. Annual report on reactor safety research projects. Reporting period 2013. Progress report

    International Nuclear Information System (INIS)

    2013-01-01

    Within its competence for energy research the Federal Ministry of Economics and Technology (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS)mbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRSF- Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the Internet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. It has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties. (orig.)

  2. Annual report on reactor safety research projects. Reporting period 2015. Progress report

    International Nuclear Information System (INIS)

    2015-01-01

    Within its competence for energy research the Federal Ministry for Economic Affairs and Energy (BMWi) sponsors research projects on the safety of nuclear power plants currently in operation. The objective of these projects is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft tor Anlagen- und Reaktorsicherheit (GRS) gGmbH, by order of the BMWi, continuously issues information on the status of such research projects by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are ·' prepared in a standard form by the research organisations themselves as documentation of their progress in work. The progress reports are published by the Project Management Agency/Authority Support Division of GRS. The reports as of the year 2000 are available in the lnternet-based information system on results and data of reactor safety research (http://www.grs-fbw.de). The compilation of the reports is classified according to the classification system ''Joint Safety Research Index (JSRI)''. The reports are arranged in sequence of their project numbers. it has to be pointed out that the authors of the reports are responsible for the contents of this compilation. The BMWi does not take any responsibility for the correctness, exactness and completeness of the information nor for the observance of private claims of third parties.

  3. Japan`s largest composition dam, aiming for harmony with nature. Chubetsu dam; Shizen tono chowa wo mezasu, Nippon ichi no fukugo dam. Chubetsu dam

    Energy Technology Data Exchange (ETDEWEB)

    Mizushima, T. [Hokkaido Development Bureau, Hokkaido Development Agency, Sapporo (Japan)

    1994-08-15

    This paper introduces Chubetsu Dam planned with a large-scale embankment having a river bed width of 600 m. Chubetsu Dam is being constructed with such objectives as flood control of Ishikari River, river flow rate maintenance, drinking water supply, irrigation water supply and power generation. The dam site is a gravel bed having a river bed width of 600 m and a maximum foundation rock thickness of 40 m, requiring evaluations as a dam foundation and discussions of water shielding methods. As a result of discussions at the Chubetsu Dam technical discussion committee, the dam type is decided to be a composition dam consisting of a gravity type concrete dam on the left river side and a central core type fill dam using a part of the gravel bed as the foundation on the right river side. A continuous underground wall system is planned to be used for shielding water in the gravel foundation. In discussing the anti-seismic properties, analyses for bank construction and water filling to derive stress and deformation conditions prior to an earthquake and a time-history response analysis to derive conditional changes during the earthquake are performed. According to the results thereof, evaluations are given on the safety by compounding the stress and the acceleration. In plans to improve the surrounding areas, an area will be provided upstream the reservoir where the water level is kept constant to serve as a bird sanctuary. 7 figs.

  4. Increasing drought risk in large-dam basins of South Korea

    Science.gov (United States)

    Jung, I. W.; Shin, Y.; Park, J.; Kim, D.

    2017-12-01

    In 2015, South Korea suffered one of the worst droughts in recent years. Seoul and Gyeonggi and Gangwon provinces experienced severe drought conditions, receiving less than 43 percent of the annual precipitation average of the past 30 years. Additionally, the 2015 summer precipitation was less than half of the average. The lack of summer precipitation induced serious shortages in dam storages, which are important supplies for the dry season. K-water, a public company managing South Korea's public water supply system, is fighting to secure public water supply and minimize potential damage that may occur before the subsequent wet season. This study detected significant decreasing trends (95% confidence interval) in dry-seasonal runoff rates (=dam inflow / precipitation) in three dams basins (Soyang, Chungju, and Andong). Changes in potential evapotranspiration (PET) and precipitation indices were examined to investigate potential causes of decreasing runoff rates trends. However, there were no clear relations among changes in runoff rates, PET, and precipitation indices. Runoff rate reduction in the three dams may increase the risk of dam operational management and long-term water resource planning. Therefore, it will be necessary to perform a multilateral analysis to better understand decreasing runoff rates.AcknowledgementsThis research was supported by a grant(2017-MPSS31-001) from Supporting Technology Development Program for Disaster Management funded by Ministry of Public Safety and Security(MPSS) of the Korean government.

  5. Safety Aspects of Sustainable Storage Dams and Earthquake Safety of Existing Dams

    Directory of Open Access Journals (Sweden)

    Martin Wieland

    2016-09-01

    Full Text Available The basic element in any sustainable dam project is safety, which includes the following safety elements: ① structural safety, ② dam safety monitoring, ③ operational safety and maintenance, and ④ emergency planning. Long-term safety primarily includes the analysis of all hazards affecting the project; that is, hazards from the natural environment, hazards from the man-made environment, and project-specific and site-specific hazards. The special features of the seismic safety of dams are discussed. Large dams were the first structures to be systematically designed against earthquakes, starting in the 1930s. However, the seismic safety of older dams is unknown, as most were designed using seismic design criteria and methods of dynamic analysis that are considered obsolete today. Therefore, we need to reevaluate the seismic safety of existing dams based on current state-of-the-art practices and rehabilitate deficient dams. For large dams, a site-specific seismic hazard analysis is usually recommended. Today, large dams and the safety-relevant elements used for controlling the reservoir after a strong earthquake must be able to withstand the ground motions of a safety evaluation earthquake. The ground motion parameters can be determined either by a probabilistic or a deterministic seismic hazard analysis. During strong earthquakes, inelastic deformations may occur in a dam; therefore, the seismic analysis has to be carried out in the time domain. Furthermore, earthquakes create multiple seismic hazards for dams such as ground shaking, fault movements, mass movements, and others. The ground motions needed by the dam engineer are not real earthquake ground motions but models of the ground motion, which allow the safe design of dams. It must also be kept in mind that dam safety evaluations must be carried out several times during the long life of large storage dams. These features are discussed in this paper.

  6. Damming evidence : Canada and the World Commission on Dams

    Energy Technology Data Exchange (ETDEWEB)

    Vert, P.; Parkinson, B.

    2003-06-01

    Large hydroelectric projects have been met with strong resistance from affected communities, particularly indigenous groups who have been displaced from their flooded communities following the damming of a river. The World Commission on Dams (WCD) was formed in 1998 to review the effectiveness of large dams and develop internationally acceptable guidelines and standards for large dams or hydro energy projects. The Canadian government, through the Canadian International Development Agency, was one of many governments to fund the WCD. However, the authors argue that despite the financial support, the Canadian government was absent from any effort to follow-up on the recommendations of the WCD. The seven strategic priorities in the decision making process include: (1) gaining public acceptance, (2) comprehensive option assessment of water, energy, food and development needs, (3) addressing existing dams to improve the benefits that can be derived from them, (4) sustaining livelihoods, (5) recognizing the entitlements and sharing benefits, (6) ensuring compliance, and (7) sharing rivers for peace, development and security. This report offers a means to assess planned or existing dams and presents a set of guidelines for good practices linked to the seven strategic priorities. Ten case studies from around the world were presented, including the Three Gorges Dam in China. 154 refs., 3 figs., 3 appendices.

  7. Proceedings of the 2010 Canadian Dam Association's public safety around dams workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Nearly 30 people have drowned in dam-related incidents over the last 10 years in Canada. The Canadian public is now calling for improved safety guidelines. Public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. However, many members of the public are not aware of the dangers posed by dams. This workshop provided a forum to discuss proposals for a draft publication of the Canadian Dam Association (CDA) guidelines for public safety and security around dams. Issues related to current legislation and liability were discussed. Methods of increasing public awareness of the hazards posed by dams included increased signage in dam locations, the use of audible and visual alert systems, and the use of booms and buoys. The responsibilities of dam owners in ensuring the safety of dams were also discussed. The conference featured 5 presentations, of which 2 have been catalogued separately for inclusion in this database. tabs., figs.

  8. Laboratory Directed Research and Development FY 2000 Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Los Alamos National Laboratory

    2001-05-01

    This is the FY00 Annual Progress report for the Laboratory Directed Research and Development (LDRD) Program at Los Alamos National Laboratory. It gives an overview of the LDRD Program, summarizes progress on each project conducted during FY00, characterizes the projects according to their relevance to major funding sources, and provides an index to principal investigators. Project summaries are grouped by LDRD component: Directed Research and Exploratory Research. Within each component, they are further grouped into the ten technical categories: (1) atomic, molecular, optical, and plasma physics, fluids, and beams, (2) bioscience, (3) chemistry, (4) computer science and software engineering, (5) engineering science, (6) geoscience, space science, and astrophysics, (7) instrumentation and diagnostics, (8) materials science, (9) mathematics, simulation, and modeling, and (10) nuclear and particle physics.

  9. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  10. Assessment of check-dam groundwater recharge with water-balance calculations

    Science.gov (United States)

    Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado; Eliades, Marinos

    2017-04-01

    Studies on the enhancement of groundwater recharge by check-dams in arid and semi-arid environments mainly focus on deriving water infiltration rates from the check-dam ponding areas. This is usually achieved by applying simple water balance models, more advanced models (e.g., two dimensional groundwater models) and field tests (e.g., infiltrometer test or soil pit tests). Recharge behind the check-dam can be affected by the built-up of sediment as a result of erosion in the upstream watershed area. This natural process can increase the uncertainty in the estimates of the recharged water volume, especially for water balance calculations. Few water balance field studies of individual check-dams have been presented in the literature and none of them presented associated uncertainties of their estimates. The objectives of this study are i) to assess the effect of a check-dam on groundwater recharge from an ephemeral river; and ii) to assess annual sedimentation at the check-dam during a 4-year period. The study was conducted on a check-dam in the semi-arid island of Cyprus. Field campaigns were carried out to measure water flow, water depth and check-dam topography in order to establish check-dam water height, volume, evaporation, outflow and recharge relations. Topographic surveys were repeated at the end of consecutive hydrological years to estimate the sediment built up in the reservoir area of the check dam. Also, sediment samples were collected from the check-dam reservoir area for bulk-density analyses. To quantify the groundwater recharge, a water balance model was applied at two locations: at the check-dam and corresponding reservoir area, and at a 4-km stretch of the river bed without check-dam. Results showed that a check-dam with a storage capacity of 25,000 m3 was able to recharge to the aquifer, in four years, a total of 12 million m3 out of the 42 million m3 of measured (or modelled) streamflow. Recharge from the analyzed 4-km long river section without

  11. Development of probabilistic operating rules for Hluhluwe Dam, South Africa

    Science.gov (United States)

    Ndiritu, J.; Odiyo, J.; Makungo, R.; Mwaka, B.; Mthethwa, N.; Ntuli, C.; Andanje, A.

    2017-08-01

    Hluhluwe Dam, with a 30 million m3 reservoir that supplies water for irrigation and Hluhluwe municipality in Kwa-Zulu Natal Province, South Africa, was consistently experiencing low storage levels over several non-drought years since 2001. The dam was operated by rules of thumb and there were no records of water releases for irrigation - the main user of the dam. This paper describes an assessment of the historic behaviour of the reservoir since its completion in 1964 and the development of operating rules that accounted for: i) the multiple and different levels of reliability at which municipal and irrigation demands need to be supplied, and ii) inter-annual and inter-decadal variability of climate and inflows into the dam. The assessment of the behaviour of the reservoir was done by simulation assuming trigonometric rule curves that were optimized to maximize both yield and storage state using the SCE-UA method. The resulting reservoir behaviour matched the observed historic trajectory reasonably well and indicated that the dam has mainly been operated at a demand of 10 million m3/year until 2000 when the demand suddenly rose to 25 million m3/year. Operating rules were developed from a statistical analysis of the base yields from 500 simulations of the reservoir each using 5 year-long stochastically generated sequences of inflows, rainfall and evaporation. After the implementation of the operating rules in 2009, the storage state of the dam improved and matched those of other reservoirs in the region that had established operating rules.

  12. The community's research and development programme on decommissioning of nuclear installations. Fourth annual progress report 1988

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    This is the fourth annual progress report on the European Community's programme (1984-88) of research on the decommissioning of nuclear installations. It shows the status of the programme at 31 December 1988. The fourth progress report describes the objectives, scope and work programme of the 72 research contracts concluded, as well as the progress of work achieved and the results obtained in 1988

  13. The Community's research and development programme on decommissioning of nuclear installations. Third annual progress report 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This is the third annual progress report of the European Community's programme (1984-88) of research on the decommissioning of nuclear installations. It shows the status of the programme on 31 December 1987. The third progress report describes the objectives, scope and work programme of the 69 research contracts concluded, as well as the progress of work achieved and the results obtained in 1987

  14. Dam construction impacts on multiscale characterization of sediment discharge in two typical karst watersheds of southwest China

    Science.gov (United States)

    Li, Zhenwei; Xu, Xianli; Xu, Chaohao; Liu, Meixian; Wang, Kelin

    2018-03-01

    Southwest China, as one of the largest continuous karst areas in the world, is a severely eroded region due to its special geological condition. Thus, soil and water conservation measures such as dam construction have been extensively implemented in this region to control sediment delivery. However, it remains unclear how dam construction affects multiscale variability of sediment discharge (SD) and its potentially influential factors in southwest China. To assess this, annual SD, water discharge (WD), precipitation (PT), potential evapotranspiration (PET), and normalized differential vegetation index (NDVI) data from 1955 to 2015 were obtained from two karst watersheds of Liujiang (no large dams) and Hongshui (dam-controlled). These sites shared the similar climatic conditions. The Mann-Kendal test, Wilcoxon rank-sum test, and continuous wavelet transform analysis was used to detect the trends and periodicity in SD, and wavelet coherence analysis were employed to detect the temporal covariance between SD and WD, PT, PET, and NDVI. Results indicated that the multiscale variability of SD was strongly influenced by dam construction. The annual SD showed significant 4-year periodic oscillation in the Liujiang watershed, while no significant cycles were found in the Hongshui watershed. Dam construction exerted substantial influence on the multiscale correlations between SD and its associated factors. The time scales that the NDVI resonated with SD were concentrated on the periodicity of 2- and 3-year in the Liujiang watershed. In contrast, no significant periodicities were observed in the Hongshu watershed. This study yields a greater understanding of SD dynamics, and is helpful for better watershed management in karst areas of southwest China.

  15. Small farm dams: impact on river flows and sustainability in a context of climate change

    Science.gov (United States)

    Habets, F.; Philippe, E.; Martin, E.; David, C. H.; Leseur, F.

    2014-10-01

    The repetition of droughts in France has led to a growing demand for irrigation water and consequently to an increase in requests for the construction of small farm dams. Although such dams are small, their accumulation in a basin affects river flows, because the water collected in these small farm dams is used for irrigation and thus does not contribute to river flow. In order to gain more insight into their impact on the annual and monthly discharges, especially during dry years, a small farm dam model was built and connected to a hydrometeorological model. Several scenarios with different volume capacities, filling catchment sizes and filling periods were tested for such dams. The results were analysed in a small basin in western France, where the pressure for building such dams is high, and then extended to the entire country. It was found that, due to the hydrometeorological conditions (mainly low precipitation compared to other regions in France), the development of small farm dams in north-western France would result in greater decreases in river flows and less efficient filling of small farm dams than in other regions. Therefore, such dams might not be as efficient as expected in supplying water to farmers when needed. Moreover, the ability to fill small farm dams is projected to decrease in a context of climate change, despite the uncertainty on the evolution of precipitation, thus worsening the situation.

  16. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  17. Dams designed to fail

    Energy Technology Data Exchange (ETDEWEB)

    Penman, A. [Geotechnical Engineering Consultants, Harpenden (United Kingdom)

    2004-09-01

    New developments in geotechnical engineering have led to methods for designing and constructing safe embankment dams. Failed dams can be categorized as those designed to fail, and those that have failed unexpectedly. This presentation outlined 3 dam failures: the 61 m high Malpasset Dam in France in 1959 which killed 421; the 71 m high Baldwin Hills Dam in the United States in 1963 which killed 5; and, the Vajont Dam in Italy in 1963 which killed 2,600 people. Following these incidents, the International Commission for Large Dams (ICOLD) reviewed regulations on reservoir safety. The 3 dams were found to have inadequate spillways and their failures were due to faults in their design. Fuse plug spillways, which address this problem, are designed to fail if an existing spillway proves inadequate. They allow additional discharge to prevent overtopping of the embankment dam. This solution can only be used if there is an adjacent valley to take the additional discharge. Examples of fuse gates were presented along with their effect on dam safety. A research program is currently underway in Norway in which high embankment dams are being studied for overtopping failure and failure due to internal erosion. Internal erosion has been the main reason why dams have failed unexpectedly. To prevent failures, designers suggested the use of a clay blanket placed under the upstream shoulder. However, for dams with soft clay cores, these underblankets could provide a route for a slip surface and that could lead to failure of the upstream shoulder. It was concluded that a safe arrangement for embankment dams includes the use of tipping gates or overturning gates which always fail at a required flood water level. Many have been installed in old and new dams around the world. 14 refs., 19 figs.

  18. Lower Granite Dam Smolt Monitoring Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mensik, Fred; Rapp, Shawn; Ross Doug (Washington Department of Fish and Wildlife, Olympia, WA)

    2005-11-01

    The 2004 fish collection season at Lower Granite Dam (LGR) was characterized by above average water temperatures, below average flows and spill, low levels of debris. The number of smolts collected for all species groups (with the exception of clipped and unclipped sockeye/kokanee) exceeded all previous collection numbers. With the continued release of unclipped supplementation chinook, steelhead and sockeye above LGR, we can not accurately distinguish wild chinook, wild steelhead and wild sockeye/kokanee from hatchery reared unclipped chinook and sockeye/kokanee in the sample. Wild steelhead can be identified from hatchery steelhead by the eroded dorsal and pectoral fins exhibited on unclipped hatchery steelhead. The numbers in the wild columns beginning in 1998 include wild and unclipped hatchery origin smolts. This season a total of 11,787,539 juvenile salmonids was collected at LGR. Of these, 11,253,837 were transported to release sites below Bonneville Dam, 11,164,132 by barge and 89,705 by truck. An additional 501,395 fish were bypassed to the river due to over-capacity of the raceways and for research purposes. According to the PTAGIS database, 177,009 PIT-tagged fish were detected at LGR in 2004. Of these, 105,894 (59.8%) were bypassed through the PIT-tag diversion system, 69,130 (39.1%) were diverted to the raceways to be transported, 1,640 (0.9%) were diverted to the sample tank, sampled and then transported, 345 (0.2%) were undetected at any of the bypass, raceway or sample exit monitors.

  19. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon O. nerka smolts during the 2003 spring out-migration at migrant traps on the Snake River and Salmon River. In 2003 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 2.1 times less in 2003 than in 2002. The wild Chinook catch was 1.1 times less than the previous year. Hatchery steelhead trout catch was 1.7 times less than in 2002. Wild steelhead trout catch was 2.1 times less than the previous year. The Snake River trap collected 579 age-0 Chinook salmon of unknown rearing. During 2003, the Snake River trap captured five hatchery and 13 wild/natural sockeye salmon and 36 coho salmon O. kisutch of unknown rearing. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. The significant differences in catch between 2003 and the previous year were due mainly to low flows during much of the trapping season and then very high flows at the end of the season, which terminated the trapping season 12 days earlier than in 2002. Trap operations began on March 9 and were terminated on May 27. The trap was out of operation for a total of zero days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 16.8% less and wild Chinook salmon catch was 1.7 times greater than in 2002. The hatchery steelhead trout collection in 2003 was 5.6% less than in 2002. Wild steelhead trout collection was 19.2% less than the previous year. Trap operations began on March 9 and were terminated on May 24 due to high

  20. Assessment of hydrological changes in the Nile River due to the construction of Renaissance Dam in Ethiopia

    Directory of Open Access Journals (Sweden)

    Mohammed El Bastawesy

    2015-06-01

    Full Text Available This paper assesses impact of the Renaissance Dam on Ethiopia; on the Nile discharge ultimately reaches Egypt downstream. The Landsat-8 satellite images of 2013 were obtained and interpreted to identify locations for the construction sites for the Renaissance Dam. Then the Shuttle Radar Topography Mission (SRTM data were obtained and processed to create a digital elevation model (DEM for the Blue Nile upstream areas that will be submerged. Different scenarios for the dams’ heights and resulting storages were simulated to estimate the resulting abstraction of the Blue Nile flows until completion of the project and the annual losses due to evaporation thereafter. The current site (506 m asl for the Renaissance Dam allows the creation of a 100 m deep reservoir with a total storage of 17.5 km3; overflows will occur at that lake’s level (606 m asl from the north western part of the developed lake into Rosaires downstream. Construction of the spillway dam to control the overflow area can allow the creation of a 180 m deep lake that store up to 173 km3 in a lake that will cover 3130 km2. The analysis of Tropical Rainfall Monitoring Mission (TRMM suggests that the variation of total annual rainfall could reach 20%, thus the resulting hydrological fluctuations could affect the estimated filling time, the operational functions and discharge downstream. The negative hydrological impacts of the Renaissance Dam will increase by increasing the height of its spillway dam, as increasing the storage capacity could affect the strategic storage for the reservoirs in Egypt and Sudan. It is strongly recommended that an agreement should be reached to compromise the storage capacities and water supplies for all dams on the Nile to thoroughly satisfy the necessary needs.

  1. Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam safety management into the next millenium; 6 - rehabilitation techniques: the unconventional application of conventional materials; nondestructive testing technology to characterize concrete dam/bedrock interface; method and instrument for detecting crack in concrete; and grouting of the cracks in the Arch 5-6 - Daniel Johnson Dam; and 7 - case studies: rehabilitation of an 80 year old Ambursen type dam; and debris booms for the protection of spillways.

  2. Geomorphic and Ecological Issues in Removal of Sediment-Filled Dams in the California Coast Ranges (Invited)

    Science.gov (United States)

    Kondolf, G. M.; Oreilly, C.

    2010-12-01

    Water-supply reservoirs in the actively eroding California Coast Ranges are vulnerable to sediment filling, thus creating obsolete impounding dams (Minear & Kondolf 2009). Once full of sediment, there is more impetus to remove dams for public safety and fish passage, but managing accumulated sediments becomes a dominant issue in dam removal planning. We analyzed the planning process and sediment management analyses for five dams, all of which have important ecological resources but whose dam removal options are constrained by potential impacts to downstream urban populations. Ringe Dam on Malibu Ck, Matilija Dam on the Ventura River, Searsville Dam on San Francisquito Ck, and Upper York Creek Dam on York Ck cut off important habitat for anadromous steelhead trout (Oncorhynchus mykiss). San Clemente Dam on the Carmel River has a working fish ladder, but only some of the migratory steelhead use it. By virtue of having filled with sediment, all five dams are at greater risk of seismic failure. San Clemente Dam is at greater risk because its foundation is on alluvium (not bedrock), and the poor-quality concrete in Matilija Dam is deteriorating from an akali-aggregate reaction. Simply removing the dams and allowing accumulated sediments to be transported downstream is not an option because all these rivers have extremely expensive houses along downstream banks and floodplains, so that allowing the downstream channel to aggrade with dam-dervied sediments could expose agencies to liability for future flood losses. Analyses of potential sediment transport have been based mostly on application of tractive force models, and have supported management responses ranging from in-situ stabilization (San Clemente and Matilija) to removal of stored sediment (York) to annual dredging to maintain capacity and prevent sediment passing over the dam (proposed for Searsville).

  3. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  4. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.

  5. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.

  6. Idaho Natural Production Monitoring and Evaluation : Annual Progress Report February 1, 2007 - January 31, 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Copeland, Timothy; Johnson, June; Putnam, Scott

    2008-12-01

    River stocks of steelhead and spring/summer Chinook salmon still have significant natural reproduction and thus are the focal species for this project's investigations. The overall goal is to monitor the abundance, productivity, distribution, and stock-specific life history characteristics of naturally produced steelhead trout and Chinook salmon in Idaho (IDFG 2007). We have grouped project tasks into three objectives, as defined in our latest project proposal and most recent statement of work. The purpose of each objective involves enumerating or describing individuals within the various life stages of Snake River anadromous salmonids. By understanding the transitions between life stages and associated controlling factors, we hope to achieve a mechanistic understanding of stock-specific population dynamics. This understanding will improve mitigation and recovery efforts. Objective 1. Measure 2007 adult escapement and describe the age structure of the spawning run of naturally produced spring/summer Chinook salmon passing Lower Granite Dam. Objective 2. Monitor the juvenile production of Chinook salmon and steelhead trout for the major population groups (MPGs) within the Clearwater and Salmon subbasins. Objective 3. Evaluate life cycle survival and the freshwater productivity/production of Snake River spring/summer Chinook salmon. There are two components: update/refine a stock-recruit model and estimate aggregate smolt-to-adult survival. In this annual progress report, we present technical results for work done during 2007. Part 2 contains detailed results of INPMEP aging research and estimation of smolt-to-adult return rates for wild and naturally produced Chinook salmon (Objectives 1 and 3). Part 3 is a report on the ongoing development of a stock-recruit model for the freshwater phase of spring/summer Chinook salmon in the Snake River basin (Objective 3). Part 4 is a summary of the parr density data (Objective 2) collected in 2007 using the new site selection

  7. Oldman river dam mitigation program downstream vegetation project report, Volume II: The potential effects of an operating plan for the Oldman River dam on Riparian cottonwood forests

    Energy Technology Data Exchange (ETDEWEB)

    Mahoney, J.M.

    1993-01-01

    Extensive cottonwood (poplar) forests exist in the Oldman River valley downstream of the Oldman River dam. Studies of similar forests in nearby river valleys and elsewhere on the western prairies have found significant declines of some riparian forests following river damming. This investigation was initiated to determine the causes of cottonwood forest decline downstream from existing dams in southern Alberta; inventory the existing river valley forests in the Oldman Basin; establish study sites in the Oldman River forests to monitor changes in forest status following commissioning of the Oldman River dam, and evaluate the probable impact of proposed operating plans for the Oldman River dam and associated water control structures on downstream forests. This report summarizes the progress made in the analyses of the probable effects on the survival of the forests, including a discussion of the hydrological conditions essential for cottonwood forest regeneration and an explanation of the effects of altering these characteristics on riparian forests; the hydrological alterations expected along various river reaches in the Oldman Basin with the implementation of the proposed OD05 Oldman Dam operating plan; and preliminary analyses of the problem impacts of the OD05 operating plan on the cottonwood forests along these reaches.

  8. The Community's research and development programme on decommissioning of nuclear installations (1989-1993). Annual progress report 1991

    International Nuclear Information System (INIS)

    1992-01-01

    This is the second annual progress report of the European Community's programme (1989-93) of research on decommissioning of nuclear installations. It shows the status of the programme on 31 December 1991. This second progress report summarizes the objectives, scope and work programme of the 76 research contracts concluded, as well as the progress of work achieved and the results obtained in 1991

  9. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  10. Downstream impacts of a Central Amazonian hydroelectric dam on tree growth and mortality in floodplain forests

    Science.gov (United States)

    Resende, A. F. D.; Silva, T. S. F.; Silva, J. D. S.; Piedade, M. T. F.; Streher, A. S.; Ferreira-Ferreira, J.; Schongart, J.

    2017-12-01

    The flood pulse of large Amazonian Rivers is characterized by predictable high- and low-water periods during the annual cycle, and is the main driving force in the floodplains regulating decomposition, nutrient cycles, productivity, life cycles and growth rhythms of floodplains' biota. Over at least 20 millions of years, tree species in these ecosystems developed complex adaptative mechanisms to tolerate flooding, such as the tree species Macrolobium acaciifolium (Fabaceae) and Eschweilera tenuifolia (Lecythidaceae) occupying the lower topographic positions in the floodplain forests along the oligothrophic black-water rivers. Tree growth occurs mainly during terrestrial phase, while during the aquatic phase the anoxic conditions result into a cambial dormancy and formation of annual tree rings. The hydroelectric dam Balbina which was installed in the Uatumã River (central Amazonia) during the 1980s altered significantly the flood pulse regime resulting into higher minimum and lower maximum annual water levels. The suppression of the terrestrial phase caused large-scale mortality of flood-adapted trees growing on the lower topographic positions, as evidenced by radiocarbon dating and cross-dating techniques (dendrochronology). In this study we estimated the extension of dead forests using high resolution ALOS/PALSAR radar images, for their detection along a fluvial distance of more than 280 km downstream of the power plant. Further we analyzed tree growth of 60 living individuals of E. tenuifolia by tree-ring analyses comparing the post- and pre-dam periods. We evaluated the impacts of the altered hydrological regime on tree growth considering ontogenetic effects and the fluvial distance of the trees to the dam. Since the Balbina power plant started operating the associated igapó forests lost about 11% of its cover. We found a significant reduction of tree growth of E. tenuifolia during the post-dam period as a consequence of the increasing aquatic phase duration

  11. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H. [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  12. Public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Bourassa, H [Centre d' expertise hydrique du Quebec, Quebec, PQ (Canada)

    2009-07-01

    Fourty public dams are managed on a real-time basis by the Centre d'expertise hydrique du Quebec (CEHQ). This presentation described the public dams owned by the CEHQ and discussed the public safety measures at the dams. The dams serve various purposes, including protection against floods; industrial or drinking water supply; resort or recreational activities; hydroelectric development; and wildlife conservation. Trigger events were also discussed, such as the complaint at Rapides-des-Cedres dam and deaths that occurred in 2004 when water from a dam was released without warning. Several photographs were presented to illustrate that people were unaware of the danger. Initiatives aimed at raising awareness and studying public safety issues were discussed. A pilot project was launched and a permanent committee was created to evaluate all aspects of public safety at the dams owned by CEHQ. The first tasks of the committee were to establish requirements for waterway safety barriers, both upstream and downstream, for all public dams; to establish requirements for safety signage for all public dams; and to develop criteria to decide on safety signage at each dam. figs.

  13. Will river erosion below the Three Gorges Dam stop in the middle Yangtze?

    Science.gov (United States)

    Lai, X.; Yin, D.; Finlayson, B. L.; Wei, T.; Li, M.; Yuan, W.; Yang, S.; Dai, Z.; Gao, S.; Chen, Z.

    2017-11-01

    The environmental impact of the Three Gorges Dam has been a subject of vigorous academic, political and social debate since its inception. This includes the key issue of post-dam river channel erosion, which was predicted by the feasibility study to extend to the river mouth. In this paper we examine the geomorphic response of the channel of the middle Yangtze for 660 km downstream of the dam. Using data on channel characteristics, bed material and sediment transport, we show that in the decade following the dam closure, pre-dam seasonal erosion has been replaced by year-round erosion, a pattern most marked at the upstream end of the study area. The sediment carrying capacity of the river channel has been largely reduced below the dam. The locus of bed scour has moved progressively downstream, ceasing as the bed material became too coarse to be transported (e.g. D50: 0.29 mm pre-dam coarsened to 20 mm below the dam by 2008). About 400 km below the dam there is a reduction in channel slope that changes the sediment carrying capacity from 0.25 kg m-3 to only about 0.05 kg m-3, which is insufficient to move bed sediment. The new long-term hydro-morphological equilibrium that will be established in this section of the middle Yangtze will prevent the further incision downstream initiated by the Three Gorges Dam. The results suggest that the full extent of adverse environmental impact predicted by the pre-dam studies will not eventuate.

  14. Uncertainty Instability Risk Analysis of High Concrete Arch Dam Abutments

    Directory of Open Access Journals (Sweden)

    Xin Cao

    2017-01-01

    Full Text Available The uncertainties associated with concrete arch dams rise with the increased height of dams. Given the uncertainties associated with influencing factors, the stability of high arch dam abutments as a fuzzy random event was studied. In addition, given the randomness and fuzziness of calculation parameters as well as the failure criterion, hazard point and hazard surface uncertainty instability risk ratio models were proposed for high arch dam abutments on the basis of credibility theory. The uncertainty instability failure criterion was derived through the analysis of the progressive instability failure process on the basis of Shannon’s entropy theory. The uncertainties associated with influencing factors were quantized by probability or possibility distribution assignments. Gaussian random theory was used to generate random realizations for influence factors with spatial variability. The uncertainty stability analysis method was proposed by combining the finite element analysis and the limit equilibrium method. The instability risk ratio was calculated using the Monte Carlo simulation method and fuzzy random postprocessing. Results corroborate that the modeling approach is sound and that the calculation method is feasible.

  15. Hydrological Effects of Chashm Dam on the Downstream of Talar River Watershed

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Khaleghi

    2017-02-01

    rights users' requirement and downstream environmental requirements are 4.54, 2.164 and 2.448 million m3, respectively. This is despite the fact that the volume of annual input water is slightly lower than this figure in normal. Conclusion: Simulation of the study area hydrological behavior shows that the Chashm Dam average water discharge is near to 8.6 million m3. This figure will be significant changes during wet and drought periods. The minimum and maximum monthly discharge of the Chashm Dam watershed in August and February is equal to 0.31 and 0.55 m3/s respectively. The minimum and maximum monthly water demand in turn in October and August is equal to 0.015 and 0.4 m3/s respectively, and this shows that the river discharge in June is lower than the downstream water demand. Based on confirmed studies of the Kamandab Consulting Engineers, drinking water requirement of Semnan province, water rights users' requirement and downstream environmental requirements are 4.54, 2.164 and 2.448 million m3, respectively. This is despite the fact that the volume of annual input water is slightly lower than this figure in normal. In addition, the Chashm Dam area is about 110 hectares and given the minimum annual actual evaporation equal to 700 mm, about seven hundred thousand cubic meters of water stored in the reservoir will be lost. Due to the simultaneous occurrence of the maximum water requirement, maximum evaporation and a minimum of water inlet to the Chashm Dam reservoir in warm seasons, it seemsthat, it is not possible to provide needs based on these studies and no doubt, in the case of water supply in Semnan province, we have to stop the flow of the river in downstream of the dam. The results of this study suggest that on many rivers large headwater dams have reduced the frequency and duration of floodplain inundation downstream and these changes lead to changes in downstream ecosystems. The results from the simulation and analysis of the Chashm Dam in downstream are as

  16. Dam failure analysis for the Lago El Guineo Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Gómez-Fragoso, Julieta; Heriberto Torres-Sierra,

    2016-08-09

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed hydrologic and hydraulic analyses to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago El Guineo Dam. The Lago El Guineo Dam is within the headwaters of the Río Grande de Manatí and impounds a drainage area of about 4.25 square kilometers.The hydrologic assessment was designed to determine the outflow hydrographs and peak discharges for Lago El Guineo and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation event, (2) a 24-hour probable maximum precipitation event, and (3) a 24-hour, 100-year recurrence rainfall event. The hydraulic study simulated a dam failure of Lago El Guineo Dam using flood hydrographs generated from the hydrologic study. The simulated dam failure generated a hydrograph that was routed downstream from Lago El Guineo Dam through the lower reaches of the Río Toro Negro and the Río Grande de Manatí to determine water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” conditions. The Hydrologic Engineering Center’s Hydrologic Modeling System (HEC–HMS) and Hydrologic Engineering Center’s River Analysis System (HEC–RAS) computer programs, developed by the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was completed using the unsteady flow module available in the HEC–RAS model.Above the Lago El Guineo Dam, the simulated inflow peak discharges from HEC–HMS resulted in about 550 and 414 cubic meters per second for the 6- and 24-hour probable maximum precipitation events, respectively. The 24-hour, 100-year recurrence storm simulation resulted in a peak discharge of about 216 cubic meters per second. For the hydrologic analysis, no dam failure conditions are

  17. 76 FR 45862 - Agency Information Collection Activities: New Collection; Semi-Annual Progress Report for...

    Science.gov (United States)

    2011-08-01

    ... the Services, Training, Education and Policies to Reduce Domestic Violence, Dating Violence, Sexual... Collection; Semi- Annual Progress Report for Grantees From the Services, Training, Education and Policies To Reduce Domestic Violence, Dating Violence, Sexual Assault and Stalking in Secondary Schools Grant Program...

  18. Commercial waste treatment program annual progress report for FY 1983

    Energy Technology Data Exchange (ETDEWEB)

    McElroy, J.L.; Burkholder, H.C. (comps.)

    1984-02-01

    This annual report describes progress during FY 1983 relating to technologies under development by the Commercial Waste Treatment Program, including: development of glass waste form and vitrification equipment for high-level wastes (HLW); waste form development and process selection for transuranic (TRU) wastes; pilot-scale operation of a radioactive liquid-fed ceramic melter (LFCM) system for verifying the reliability of the reference HLW treatment proces technology; evaluation of treatment requirements for spent fuel as a waste form; second-generation waste form development for HLW; and vitrification process control and product quality assurance technologies.

  19. The Community's research and development programme on decommissioning of nuclear installations. Second annual progress report (year 1986)

    International Nuclear Information System (INIS)

    1987-01-01

    This is the second annual progress report of the European Community's programme (1984-88) of research on the decommissioning of nuclear installations. It shows the status of the programme on 31 December 1986. This second progress report describes the objectives, scope and work programme of the 58 research contracts concluded, as well as the progress of work achieved and the results obtained in 1986

  20. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.; McKinstry, C.; Cook, C. [Pacific Northwest National Laboratory

    2005-02-01

    This report documents a four-year study(a) to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss) at the entrance to the forebay of the third powerplant at Grand Coulee Dam. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). In this report, emphasis is placed on the methodology and results associated with the fourth project year and compared with findings from the previous years to provide an overall project summary. Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power and Conservation Council Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph dams on the Columbia River (Figure S.1). A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish, including kokanee and rainbow trout, were entrained annually at Grand Coulee Dam. Analysis of the data found that 85% of the total entrainment occurred at the dam's third powerplant. Because these entrainment rates represent a significant loss to the tribal fisheries upstream of the dam, they have been judged unacceptable to fishery managers responsible for perpetuating the fishery in Lake Roosevelt. In an effort to reduce fish entrainment rates, the scope of work for the Chief Joseph Kokanee Enhancement Project was modified in 2001 to include a multiyear study of the efficacy of using strobe lights to deter fish from entering the third powerplant forebay. Pacific Northwest National Laboratory initiated the four-year study in collaboration with Colville

  1. Smolt monitoring at the head of lower granite reservoir and lower Granite Dam, annual report 1999 operations.; ANNUAL

    International Nuclear Information System (INIS)

    United States. Bonneville Power Administration. Division of Fish and Wildlife; Idaho. Dept. of Fish and Game.

    2001-01-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka during the 1999 spring out-migration at migrant traps on the Snake River and Salmon River. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1999. Total annual hatchery chinook salmon catch at the Snake River trap was 440% of the 1998 number. The wild chinook catch was 603% of the previous year's catch. Hatchery steelhead trout catch was 93% of 1998 numbers. Wild steelhead trout catch was 68% of 1998 numbers. The Snake River trap collected 62 age-0 chinook salmon. During 1998 the Snake River trap captured 173 hatchery and 37 wild/natural sockeye salmon and 130 hatchery coho salmon O. kisutch. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations began on March 14 and were terminated for the season due to high flows on May 25. The trap was out of operation for 18 d during the season due to high flow and debris. Hatchery chinook salmon catch at the Salmon River trap was 214%, and wild chinook salmon catch was 384% of 1998 numbers. The hatchery steelhead trout collection in 1999 was 210% of the 1998 numbers. Wild steelhead trout collection in 1999 was 203% of the 1998 catch. Trap operations began on March 14 and were terminated for the season due to high flows on May 21. The trap was out of operation for 17 d during the season due to high flow and debris

  2. Smolt monitoring at the head of Lower Granite Reservoir and Lower Granite Dam, annual report 1997 operations.; ANNUAL

    International Nuclear Information System (INIS)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1999-01-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1997 spring out-migration at migrant traps on the Snake River and Salmon River. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1997. Total annual hatchery chinook salmon catch at the Snake River trap was 49% of the 1996 number but only 6% of the 1995 catch. The wild chinook catch was 77% of the 1996 but was only 13% of 1995. Hatchery steelhead trout catch was 18% of 1996 numbers but only 7% of the 1995 numbers. Wild steelhead trout catch was 22% of 1996 but only 11% of the 1995 numbers. The Snake River trap collected eight age-0 chinook salmon and one sockeye/kokanee salmon O. nerka. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations were terminated for the season due to high flows and trap damage on May 8 and were out of operation for 23 d due to high flow and debris. Hatchery chinook salmon catch at the Salmon River trap was 37% and wild chinook salmon catch was 60% of 1996 numbers but only 5% and 11% of 1995 catch, respectively. The 1997 hatchery steelhead trout collection was 13% of the 1996 catch and 32% of the 1995 numbers. Wild steelhead trout collection in 1997 was 21% of the 1996 catch and 13% of the 1995 numbers. Trap operations were terminated for the season due to high flows and trap damage on May 7 and were out of operation for 19 d due to high flow and debris

  3. A Framework to Assess the Cumulative Hydrological Impacts of Dams on flow Regime

    Science.gov (United States)

    Wang, Y.; Wang, D.

    2016-12-01

    In this study we proposed a framework to assess the cumulative impact of dams on hydrological regime, and the impacts of the Three Gorges Dam on flow regime in Yangtze River were investigated with the framework. We reconstructed the unregulated flow series to compare with the regulated flow series in the same period. Eco-surplus and eco-deficit and the Indicators of Hydrologic Alteration parameters were used to examine the hydrological regime change. Among IHA parameters, Wilcoxon signed-rank test and Principal Components Analysis identified the representative indicators of hydrological alterations. Eco-surplus and eco-deficit showed that the reservoir also changed the seasonal regime of the flows in autumn and winter. Annual extreme flows and October flows changes lead to negative ecological implications downstream from the Three Gorges Dam. Ecological operation for the Three Gorges Dam is necessary to mitigate the negative effects on the river ecosystem in the middle reach of Yangtze River. The framework proposed here could be a robust method to assess the cumulative impacts of reservoir operation.

  4. The environment of the Olympic Dam project

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The Olympic Dam uranium/copper/gold project at Roxby Downs, South Australia, has a harsh environment with high summer temperatures, low rainfall and poor quality soils. There are no natural water courses. The vegetation is dominated by annual grasses in summer and wildflowers in winter. Red kangaroos are the most commonly sighted native mammals. The Fat-tailed Dunnart a nocturnal carniverous marsupial, is found. Eighty three bird species have been recorded. Reptiles are numerous and one amphibian occurs. A vermin eradication program aimed at rabbit control is conducted. ills

  5. The occurrence and removal of algae (including cyanobacteria) and their related organic compounds from source water in Vaalkop Dam with conventional and advanced drinking water treatment processes

    OpenAIRE

    Swanepoel, A; Du Preez, HH; Cloete, N

    2017-01-01

    Cyanobacterial bloom formation in freshwaters, such as rivers, lakes and dams, is known to occur throughout the world. The Vaalkop Dam, which serves as source to the Vaalkop drinking water treatment works (DWTW), is no exception. Blooms of cyanobacteria occur annually in Vaalkop Dam as well as in dams from which Vaalkop is replenished during low-rainfall periods. These blooms during the summer months are associated with the production of cyanotoxins and taste and odour compounds such as geosm...

  6. Effects of Mitigative Measures on Productivity of White Sturgeon Populations in the Columbia River Downstream from McNary Dam: Determine Status and Habitat Requirements of White Sturgeon Populations in the Columbia and Snake Rivers Upstream from McNary Dam, 1997-1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ward, David L. (Oregon Department of Fish and Wildlife, Portland, OR)

    1999-02-01

    The authors report on their progress from April 1997 through March 1998 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), National Marine Fisheries Service (NMFS; Report D), U.S. Fish and Wildlife Service (USFWS; Report E), and Columbia River Inter-Tribal Fish Commission (CRITFC; Report F). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported. Highlights of results of the work from April 1997 through March 1998 listed.

  7. Assessing the impacts of dams and levees on the hydrologic record of the Middle and Lower Mississippi River, USA

    Science.gov (United States)

    Remo, Jonathan W.F.; Ickes, Brian; Ryherd, Julia K.; Guida, Ross J.; Therrell, Matthew D.

    2018-01-01

    The impacts of dams and levees on the long-term (>130 years) discharge record was assessed along a ~1200 km segment of the Mississippi River between St. Louis, Missouri, and Vicksburg, Mississippi. To aid in our evaluation of dam impacts, we used data from the U.S. National Inventory of Dams to calculate the rate of reservoir expansion at five long-term hydrologic monitoring stations along the study segment. We divided the hydrologic record at each station into three periods: (1) a pre-rapid reservoir expansion period; (2) a rapid reservoir expansion period; and (3) a post-rapid reservoir expansion period. We then used three approaches to assess changes in the hydrologic record at each station. Indicators of hydrologic alteration (IHA) and flow duration hydrographs were used to quantify changes in flow conditions between the pre- and post-rapid reservoir expansion periods. Auto-regressive interrupted time series analysis (ARITS) was used to assess trends in maximum annual discharge, mean annual discharge, minimum annual discharge, and standard deviation of daily discharges within a given water year. A one-dimensional HEC-RAS hydraulic model was used to assess the impact of levees on flood flows. Our results revealed that minimum annual discharges and low-flow IHA parameters showed the most significant changes. Additionally, increasing trends in minimum annual discharge during the rapid reservoir expansion period were found at three out of the five hydrologic monitoring stations. These IHA and ARITS results support previous findings consistent with the observation that reservoirs generally have the greatest impacts on low-flow conditions. River segment scale hydraulic modeling revealed levees can modestly increase peak flood discharges, while basin-scale hydrologic modeling assessments by the U.S. Army Corps of Engineers showed that tributary reservoirs reduced peak discharges by a similar magnitude (2 to 30%). This finding suggests that the effects of dams and

  8. A Well-Balanced and Fully Coupled Noncapacity Model for Dam-Break Flooding

    Directory of Open Access Journals (Sweden)

    Zhiyuan Yue

    2015-01-01

    Full Text Available The last two decades have seen great progress in mathematical modeling of fluvial processes and flooding in terms of either approximation of the physical processes or dealing with the numerical difficulties. Yet attention to simultaneously taking advancements of both aspects is rarely paid. Here a well-balanced and fully coupled noncapacity model is presented of dam-break flooding over erodible beds. The governing equations are based on the complete mass and momentum conservation laws, implying fully coupled interactions between the dam-break flow and sediment transport. A well-balanced Godunov-type finite volume method is used to solve the governing equations, facilitating satisfactory representation of the complex flow phenomena. The well-balanced property is attained by using the divergence form of matrix related to the static force for the bottom slope source term. Existing classical tests, including idealized dam-break flooding over irregular topography and experimental dam-break flooding with/without sediment transport, are numerically simulated, showing a satisfactory quantitative performance of this model.

  9. Teton Dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Snorteland, N. [United States Dept. of the Interior, Washington, DC (United States). Bureau of Reclamation

    2009-07-01

    This case summary discussed an internal erosion failure that occurred at the embankment foundation of Teton Dam. The project was designed as a run-of-the-river power generation facility and to provide irrigation, flood protection, and power generation to the lower Teton region of southern Idaho. The dam site was located next to the eastern Snake River plain, a volcanic filled depression. The foundation's cutoff trench was excavated into the bedrock along the length of the dam. The dam was designed as a zoned earthfill with a height of 305 feet. A trench made of low plasticity windblown silt was designed to connect the embankment core to the rock foundation. Seeps were noted in 1976, and a leak was observed near the toe of the dam. A wet spot appeared on the downstream face of the dam at elevation 5200. A sinkhole then developed. The embankment crest collapsed, and the dam breached. Peak outflow was estimated at 1,000,000 cfs. The failure was attributed to a lack of communication between designers, a failure to understand geologic information about the region, and an insufficient review of designs and specifications by designers and field personnel. No monitoring instrumentation was installed in the embankment. Approximately 300 square miles were inundated, and 25,000 people were displaced. Eleven people were killed. A review group noted that the rock surface was not adequately sealed, and that the dam failed as a result of inadequate protection of the impervious core material from internal erosion. 42 figs.

  10. FY2014 Energy Storage R&D Annual Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-03-01

    The Energy Storage research and development (R&D) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for projects focusing on batteries for plug-in electric vehicles. Program targets focus on overcoming technical barriers to enable market success including: (1) significantly reducing battery cost, (2) increasing battery performance (power, energy, durability), (3) reducing battery weight & volume, and (4) increasing battery tolerance to abusive conditions such as short circuit, overcharge, and crush. This report describes the progress made on the research and development projects funded by the Energy Storage subprogram in 2014. You can download individual sections at the following website, http://energy.gov/eere/vehicles/downloads/vehicle-technologies-office-2014-energy-storage-rd-annual-report.

  11. How big of an effect do small dams have? Using geomorphological footprints to quantify spatial impact of low-head dams and identify patterns of across-dam variation

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Costigan, Katie H.; Daniels, Melinda D.

    2015-01-01

    Longitudinal connectivity is a fundamental characteristic of rivers that can be disrupted by natural and anthropogenic processes. Dams are significant disruptions to streams. Over 2,000,000 low-head dams (research and conservation is impaired by not knowing the magnitude of low-head dam impacts. Based on the geomorphic literature, we refined a methodology that allowed us to quantify the spatial extent of low-head dam impacts (herein dam footprint), assessed variation in dam footprints across low-head dams within a river network, and identified select aspects of the context of this variation. Wetted width, depth, and substrate size distributions upstream and downstream of six low-head dams within the Upper Neosho River, Kansas, United States of America were measured. Total dam footprints averaged 7.9 km (3.0–15.3 km) or 287 wetted widths (136–437 wetted widths). Estimates included both upstream (mean: 6.7 km or 243 wetted widths) and downstream footprints (mean: 1.2 km or 44 wetted widths). Altogether the six low-head dams impacted 47.3 km (about 17%) of the mainstem in the river network. Despite differences in age, size, location, and primary function, the sizes of geomorphic footprints of individual low-head dams in the Upper Neosho river network were relatively similar. The number of upstream dams and distance to upstream dams, but not dam height, affected the spatial extent of dam footprints. In summary, ubiquitous low-head dams individually and cumulatively altered lotic ecosystems. Both characteristics of individual dams and the context of neighboring dams affected low-head dam impacts within the river network. For these reasons, low-head dams require a different, more integrative, approach for research and management than the individualistic approach that has been applied to larger dams.

  12. Measuring the Economic Benefits of Removing Dams and Restoring the Elwha River: Results of a Contingent Valuation Survey

    Science.gov (United States)

    Loomis, John B.

    1996-02-01

    The contingent valuation method was used to obtain estimates of willingness to pay for removing the two dams on the Elwha River on the Olympic Peninsula in Washington State and restoring the ecosystem and the anadromous fishery. Using the dichotomous choice voter referendum format, the mean annual value per household is 59 in Clallam County, 73 for the rest of Washington, and 68 for households in the rest of the United States. The aggregate benefits to residents of the State of Washington is 138 million annually for 10 years and between 3 and 6 billion to all U.S. households. These estimates suggest that the general public would be willing to pay to remove old dams that block salmon migration.

  13. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  14. Mechanics of slide dams

    Energy Technology Data Exchange (ETDEWEB)

    Young, G A [Engineering, Agbabian-Jacobsen Associates, Los Angeles (United States)

    1970-05-15

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  15. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  16. Survival estimates for the passage of juvenile salmonids through Snake River dams and reservoirs, 1996. Annual report

    International Nuclear Information System (INIS)

    Smith, S.G.; Muir, W.D.; Hockersmith, E.E.; Achord, S.; Eppard, M.B.; Ruehle, T.E.; Williams, J.G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature

  17. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature.

  18. Spruce Lake Dam reconstruction

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, G. [SGE Acres Ltd., Fredericton, NB (Canada); Barnard, J. [SGE Acres Ltd., St. John' s, NF (Canada); Vriezen, C. [City of Saint John, NF (Canada); Stephenson, M. [Jacques Whitford Environment Ltd., Fredericton, NB (Canada)

    2004-09-01

    Spruce Lake Dam was constructed in 1898 as part of the water supply system for Saint John, New Brunswick. The original dam was a 6 meter high, 140 meter long concrete gravity dam with an intake structure at its mid point and an overflow spillway at the left abutment. A rehabilitation project was launched in 2001 to bring the deteriorated dam into conformance with the dam safety guidelines of the Canadian Dam Association. The project criteria included minimal disruption to normal operation of water supply facilities and no negative effect on water quality. The project involved installation of a new low level outlet, removal of a gate house and water intake pipes, replacement of an access road culvert in the spillway channel, and raising the earth dam section by 1.8 meters to allow for increased water storage. The new raised section has an impervious core. The project also involved site and geotechnical investigations as well as hydrotechnical and environmental studies. This presentation described the final design of the remedial work and the environmental permitting procedures. Raising the operating level of the system proved successful as demonstrated by the fewer number of pumping days required after dam rehabilitation. The dam safety assessment under the Canadian Environmental Assessment Act began in April 2001, and the rehabilitation was completed by the end of 2002. 1 tab., 8 figs.

  19. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Muir, William D.

    1995-02-01

    In 1994, the National Marine Fisheries Service and the University of Washington completed the second year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through the dams and reservoirs of the Snake River. Actively migrating smolts were collected at selected locations above, at, and below Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Survival estimates were calculated using the Single-Release, Modified Single-Release, and Paired-Release Models.

  20. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the

  1. The UK fuel poverty strategy: 5th annual progress report 2007

    International Nuclear Information System (INIS)

    2007-12-01

    This fifth annual progress report details government progress in 2007 in tackling fuel poverty and movement towards targets. The United Kingdom were the first country in the world to recognise the issue of fuel poverty and to put in place measures to tackle the issue, including spending 20 billion pounds sterling on benefits and programmes since the year 2000. The report covers progress to date, schemes and initiatives to tackle fuel poverty, the energy market and looks ahead to the future. Progress and development of the schemes across the devolved nations are also considered. This report is the first to publish the Government's proposals for the Carbon Emissions Reduction Target (CERT) priority group, which were laid before Parliament on 5th December 2007. This report is the first to present the fuel poverty figures for 2005, and shows the effects of rising energy prices. The Government continues to take action to ensure that the energy market is working properly, and to encourage reform in the EU on energy market liberalisation - this should reduce pressure on prices. Those in fuel poverty have much to gain by switching supplier and this report outlines the action taken by Ofgem and Energywatch to encourage this

  2. Dworshak Dam impacts assessment and fisheries investigation -- Kokanee depth distribution in Dworshak Reservoir and implications toward minimizing entrainment. Annual progress report, January--December 1994

    International Nuclear Information System (INIS)

    Maiolie, M.A.; Elam, S.

    1996-10-01

    The authors measured the day and night depth distribution of kokanee Oncorhynchus nerka kennerlyi directly upstream of Dworshak Dam from October 1993 to December 1994 using split-beam hydroacoustics. At night most kokanee (70%) were distributed in a diffuse layer about 10 m thick. The depth of the layer varied with the season and ranged from 30 to 40 m deep during winter and from 15 to 25 m deep during summer. Nighttime depth of the kokanee layer during summer roughly corresponded to a zone where water temperatures ranged from 7 C to 12 C. Daytime kokanee distribution was much different with kokanee located in dense schools. Most kokanee (70%) were found in a 5--15 m thick layer during summer. Daytime depth distribution was also shallowest during fall and deepest during winter. Dworshak Dam has structures which can be used for selective water withdrawal and can function in depth ranges that will avoid the kokanee layer. Temperature constraints limit the use of selective withdrawal during the spring, summer, and fall, but in the winter, water is nearly isothermal and the full range of selector gate depths may be utilized. From October 1993 to February 1994, selector gates were positioned to withdraw water from above the kokanee layer. The discharge pattern also changed with more water being released during May and July, and less water being released during fall and winter. A combination of these two changes is thought to have increased kokanee densities to a record high of 69 adults/ha

  3. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  4. 76 FR 30388 - Agency Information Collection Activities: New collection Semi-Annual Progress Report for Grantees...

    Science.gov (United States)

    2011-05-25

    ... Grantees from the Services, Training, Education and Policies to Reduce Domestic Violence, Dating Violence... collection Semi- Annual Progress Report for Grantees From the Services, Training, Education and Policies To Reduce Domestic Violence, Dating Violence, Sexual Assault and Stalking in Secondary Schools Grant Program...

  5. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  6. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  7. Anticipated sediment delivery to the lower Elwha River during and following dam removal: Chapter 2 in Coastal habitats of the Elwha River, Washington--biological and physical patterns and processes prior to dam removal

    Science.gov (United States)

    Czuba, Christiana R.; Randle, Timothy J.; Bountry, Jennifer A.; Magirl, Christopher S.; Czuba, Jonathan A.; Curran, Christopher A.; Konrad, Christopher P.; Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.

    2011-01-01

    During and after the planned incremental removal of two large, century-old concrete dams between 2011 and 2014, the sediment-transport regime in the lower Elwha River of western Washington will initially spike above background levels and then return to pre-dam conditions some years after complete dam removal. Measurements indicate the upper reaches of the steep-gradient Elwha River, draining the northeast section of the Olympic Mountains, carries between an estimated 120,000 and 290,000 cubic meters of sediment annually. This large load has deposited an estimated 19 million cubic meters of sediment within the two reservoirs formed by the Elwha and Glines Canyon Dams. It is anticipated that from 7 to 8 million cubic meters of this trapped sediment will mobilize and transport downstream during and after dam decommissioning, restoring the downstream sections of the sediment-starved river and nearshore marine environments. Downstream transport of sediment from the dam sites will have significant effects on channel morphology, water quality, and aquatic habitat during and after dam removal. Sediment concentrations are expected to be between 200 and 1,000 milligrams per liter during and just after dam removal and could rise to as much as 50,000 milligrams per liter during high flows. Downstream sedimentation in the river channel and flood plain will be potentially large, particularly in the lower Elwha River, an alluvial reach with a wide flood plain. Overall aggradation could be as much as one to several meters. Not all reservoir sediment, however, will be released to the river. Some material will remain on hill slopes and flood plains within the drained reservoirs in quantities that will depend on the hydrology, precipitation, and mechanics of the incising channel. Eventually, vegetation will stabilize this remaining reservoir sediment, and the overall sediment load in the restored river will return to pre-dam levels.

  8. Investigation of geophysical methods for assessing seepage and internal erosion in embankment dams : a study of through-dam seismic testing at WAC Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Gaffran, P.; Jeffries, M. [BC Hydro, Burnaby, BC (Canada)

    2005-07-15

    Crosshole tomography is used to establish the distribution of seismic velocity between drill holes. The through-dam mode takes advantage of the triangular cross-section of earth embankments, obviating the need for drill holes. Seismic energy, generated on one face of the dam, passes underneath the crest and is detected by sensors arrayed on the opposite face. The sinkholes discovered at WAC Bennett Dam in 1996 provided an opportunity to test the procedure. Using p-wave energy, two series of measurements were conducted, notably one immediately before remediation of one sinkhole, and a second one shortly after the sinkhole was repaired. The known defect was successfully imaged by the first round of measurements. This report presented the results of an investigation of the through-dam seismic method using propagation of seismic waves through a dam from upstream to downstream, or vice-versa. The purpose of the study was to determine if this procedure could characterize the distribution of seismic velocity within a dam in an accurate and cost effective manner. The report presented the methods of velocity testing such as crosshole and downhole, and tomography; and through-dam measurements. Background to the Bennett Dam studies was also provided, with particular reference to the Bennett Dam sinkholes; sinkhole investigations; working hypothesis for sinkhole development; sinkhole number one characterization; and sinkhole remediation. An analysis of compression wave testing at Bennett Dam and shear wave testing was then offered. Other topics that were discussed included field test procedures; methodologies for data processing; p-waves versus s-waves; applicability of the research; and costs of through-dam surveys. It was concluded that under the right circumstances, through-dam seismic testing was capable of detecting changed conditions in an embankment dam. 15 refs., 2 tabs., 41 figs., 1 appendix.

  9. Risk Perception Analysis Related To Existing Dams In Italy

    Science.gov (United States)

    Solimene, Pellegrino

    2013-04-01

    In the first part of this work, the progress of Italian National Rules about dams design, construction and operation are presented to highlight the strong connection existing between the promulgation of new decrees, as a consequence of a dam accidents, and the necessity to prevent further loss of lives and goods downstream. Following the Gleno Dam failure (1923), a special Ministerial Committee wrote out the first Regulations and made the proposal to establish, within the High Council of Public Works, a special department that become soon the "Dam Service", with the tasks of control and supervision about construction and operation phases of the dams and their reservoirs. A different definition of tasks and the structure of Dam Service were provided in accordance with law n° 183/1989, which transferred all the technical services to the Office of the Prime Minister; the aim was to join the Dam Office with the Department for National Technical Services, with the objective of increasing the knowledge of the territory and promoting the study on flood propagation downstream in case of operations on bottom outlet or hypothetical dam-break. In fact, population living downstream is not ready to accept any amount of risk because has not a good knowledge of the efforts of experts involved in dam safety, both from the operators and from the safety Authority. So it's important to optimize all the activities usually performed in a dam safety program and improve the emergency planning as a response to people's primary needs and feeling about safety from Civil Protection Authority. In the second part of the work, a definition of risk is provided as the relationship existing between probability of occurrence and loss, setting out the range within to plan for prevention (risk mitigation), thanks to the qualitative assessment of the minimum safety level that is suited to assign funds to plan for Civil Protection (loss mitigation). The basic meaning of the reliability of a zoned

  10. Anthropogenic Water Uses and River Flow Regime Alterations by Dams

    Science.gov (United States)

    Ferrazzi, M.; Botter, G.

    2017-12-01

    Dams and impoundments have been designed to reconcile the systematic conflict between patterns of anthropogenic water uses and the temporal variability of river flows. Over the past seven decades, population growth and economic development led to a marked increase in the number of these water infrastructures, so that unregulated free-flowing rivers are now rare in developed countries and alterations of the hydrologic cycle at global scale have to be properly considered and characterized. Therefore, improving our understanding of the influence of dams and reservoirs on hydrologic regimes is going to play a key role in water planning and management. In this study, a physically based analytic approach is combined to extensive hydrologic data to investigate natural flow regime alterations downstream of dams in the Central-Eastern United States. These representative case studies span a wide range of different uses, including flood control, water supply and hydropower production. Our analysis reveals that the most evident effects of flood control through dams is a decrease in the intra-seasonal variability of flows, whose extent is controlled by the ratio between the storage capacity for flood control and the average incoming streamflow. Conversely, reservoirs used for water supply lead to an increase of daily streamflow variability and an enhanced inter-catchment heterogeneity. Over the last decades, the supply of fresh water required to sustain human populations has become a major concern at global scale. Accordingly, the number of reservoirs devoted to water supply increased by 50% in the US. This pattern foreshadows a possible shift in the cumulative effect of dams on river flow regimes in terms of inter-catchment homogenization and intra-annual flow variability.

  11. Resident fish stock status above Chief Joseph and Grand Coulee dams : 2000 annual report; ANNUAL

    International Nuclear Information System (INIS)

    Lockwood, N.; McLellan, J.; Crossley, B.

    2001-01-01

    The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project

  12. Nuclear Structure Group annual progress report June 1974 -May 1975

    International Nuclear Information System (INIS)

    1975-06-01

    This is the first annual progress report of the Nuclear Structure Group of the University of Birmingham. The introduction lists the main fields of study of the Group as: polarisation penomena and optical model studies using 3 He and 4 He probes; photonuclear physics; heavy-ion physics; and K- meson physics. The programme is related to particle accelerators at Birmingham, Oxford, Harwell and the Rutherford Laboratory. The body of the report consists of summaries of 38 experiments undertaken by members of the Group. The third section contains 10 notes on instrumentation topics. Appendices contain lists of (a) personnel, (b) papers published or submitted during the period. (U.K.)

  13. Applications of remote sensing techniques to the assessment of dam safety: A progress report

    International Nuclear Information System (INIS)

    Bowlby, J.R.; Grass, J.D.; Singhroy, V.H.

    1990-01-01

    Remote sensing detection and data collection techniques, combined with data from image analyses, have become effective tools that can be used for rapid identification, interpretation and evaluation of the geological and environmental information required in some areas of performance analysis of hydraulic dams. Potential geological hazards to dams such as faults, landslides and liquefaction, regional crustal warping or tilting, stability of foundation materials, flooding and volcanic hazards are applications in which remote sensing may aid analysis. Details are presented of remote sensing techiques, optimal time of data acquisition, interpreting techniques, and application. Techniques include LANDSAT thematic mapper (TM), SPOT images, thermal infrared scanning, colour infrared photography, normal colour photography, panchromatic black and white, normal colour video, infrared video, airborne multi-spectral electronic imagery, airborne synthetic aperture radar, side scan sonar, and LIDAR (optical radar). 3 tabs

  14. Progress of emphysema in severe α1-antitrypsin deficiency as assessed by annual CT

    International Nuclear Information System (INIS)

    Dirksen, A.; Friis, M.; Olesen, K.P.

    1997-01-01

    Purpose: To assess serial CT as a measure of the progress of emphysema in patients with severe α 1 -antitrypsin deficiency (phenotype PiZ). Material and Methods: In a randomized placebo-controlled study of α 1 -antitrypsin augmentation therapy, 22 patients with moderate emphysema were followed for 2-4 years with an annual lung CT. The images were analysed by means of semiautomatic lung detection, and the degree of emphysema was quantitated by the density-mask and the percentile methods. The influence of lung volume was standardised by a regression model. Results: A highly significant decline in Hounsfield units (HU) was found in low-density areas, corresponding to a mean (SE) annual loss of lung tissue of 2.1 (0.4) g/l lung volume. Analysis of a single slice at 5 cm below the level of the carina gave comparable results: 2.4 (0.4) g/l. Conclusion: Serial CT is a sensitive measure of the progress of emphysema in patients with severe α 1 -antitrypsin deficiency. (orig.)

  15. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  16. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  17. IAEA and EU Review Progress on Cooperation, Agree on Next Steps at Annual Meeting

    International Nuclear Information System (INIS)

    2018-01-01

    The International Atomic Energy Agency (IAEA) and the European Union (EU) reviewed progress achieved in working together on a range of nuclear activities and agreed to further enhance cooperation during their sixth annual Senior Officials Meeting in Vienna. The talks on 8 February at the IAEA’s headquarters provided a forum for exchanging views on strengthening collaboration on nuclear safety, security, safeguards, sustainable development, nuclear energy research and increasing innovation. The two organizations welcomed the fruitful cooperation and progress achieved over the past years. They agreed to deepen cooperation in several areas, particularly in the promotion of nuclear applications for sustainable development.

  18. Seismic resistant design of a nuclear category I earth dam

    International Nuclear Information System (INIS)

    Vaidya, N.R.; Ries, E.R.; Kissenpfennig, J.F.

    1975-01-01

    An integral part of many nuclear power plants is the ultimate heat sink (UHS); the purpose of which is to retain and deliver a supply of service water to the plant when water from the primary circulating water system is not available. The earth dam described herein is designed to retain the reservoir for the UHS of a nuclear power plant in Southern Europe. The usual pseudo-static analysis is only as good as the estimate for the seismic coefficient used to compute an equivalent horizontal static force on a potential sliding mass. In view of the earth dam considered herein, a more accurate computation of the seismic coefficients is to be made. A two-dimensional dynamic finite element analysis is made to predict the response of the earth dam to a Safe Shutdown Earthquake excitation which is in the form of a time history of accelerations appropriately deconvoluted from the surficial time history and applied at the base of the model. The material properties such as shear modulus and damping are adjusted to be compatible with the level of strain obtained. Thus, non-linear behavior of soil is considered in the analysis and a more realistic response is predicted. Acceleration and stress are determined throughout the dam and are used to compute a seismic coefficient for a pseudo-static stability analysis and the dynamic strength to stress ratios at several points in the body of the dam. The need to design the dam to resist a progressive erosion accident resulting from postulated concentrated leaks is discussed. This may be accomplished by providing a wide, well graded core protected by wide transition cores also heavily compacted

  19. Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2003-06-01

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to

  20. Grouting of the cracks in the Arch 5-6 Daniel Johnson dam

    International Nuclear Information System (INIS)

    Lariviere, R.; Routhier, L.; Roy, V.; Saleh, K.; Tremblay, S.

    1999-01-01

    The Daniel-Johnson dam is located 800 km northeast of Montreal, PQ, and is 1314 m in length and 214 m high. Just after completion of dam construction different types of cracks started to appear on the upstream and downstream faces. During and after the construction of the dam, numerous cracks and joints were grouted in order to reduce water infiltration. In some cases, as a result of high injection pressures and inaccurate methods, the injections provoked the propagation of the existing cracks or the initiation of new ones. Because of this situation and to determine the contribution of injection to dam safety, in 1985, Hydro-Quebec applied a moratorium on all future injection work on the dam. Research work was initiated in 1986 in the areas of grouting materials, methods, equipment and behavioral analysis to establish a safe method for the injection of the cracks. A committee was formed in 1993 with members from various groups, in order to: carry out extensive behavioral analysis of the Arch 5-6 dam, carry out an investigation program in order to determine the cause of the increase of the water infiltration, undertake a structural analysis program in order to evaluate the impact of an injection on the safety of the dam, and identify the proper method and injection products to use. In 1997, as a result of the progress of the structural analysis studies and the injection research project, a decision was made to proceed with the injection of the dam. A description is included of the results of the investigation, recommendations and results of the injection research project, as well as some details of the grouting campaign carried out in January 1999. On the whole, a better knowledge was acquired of the structure, of the plunging cracks and the behaviour of the dam during the injection. In the field of injection methods, materials and equipment, research work was invaluable when it came to the injection of micro-fine cracks in concrete dams. 5 refs., 8 figs

  1. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Science.gov (United States)

    2013-08-29

    ... Bar Dams AGENCY: Tennessee Valley Authority. ACTION: Issuance of Record of Decision. SUMMARY: This... the dam safety modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams. The notice of... Loudoun, Tellico, and Watts Bar Dams was published in the Federal Register on May 31, 2013. This...

  2. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.; Skvortsova, A. E., E-mail: SkvortsovaAE@vniig.ru [B. E. Vedeneev All-Russia Research Institute of Hydraulic Engineering (VNIIG) (Russian Federation)

    2017-01-15

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  3. The strengthening of the Lavaud-Gelade dam; Le confortement de la digue de Lavaud-Gelade

    Energy Technology Data Exchange (ETDEWEB)

    Devos, J.C. [IDTPE, Direction Regionale de l`Industrie, de la Recherche et de l`Environnement (DRIRE), (France); Legras, F. [ITPE, (France)

    1996-12-31

    The Lavaud-Gelade dam (Creuse, France) was built in 1931 and operated by Electricite de France (EdF) since 1946. It is made of loam (clay and sand) with a stone protective cover. The progressive increase of leaks which started in 1982 has led to a project of strengthening of the dam which is detailed in this paper (conclusion of the safety studies, works and costs). The surveillance system has been modified and improved too. (J.S.)

  4. Pennsylvania State University Breazeale Nuclear Reactor. Thirtieth annual progress report, July 1, 1984-June 30, 1985

    International Nuclear Information System (INIS)

    Levine, S.H.; Totenbier, R.E.

    1985-08-01

    This report is the thirtieth annual progress report of the Pennsylvania State University Breazeale Nuclear Reactor and covers such topics as: personnel; reactor facility; cobalt-60 facility; education and training; Radionuclear Application Laboratory; Low Level Radiation Monitoring Laboratory; and facility research utilization

  5. Western Research Institute: Annual technical progress report, October 1987--September 1988

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-01

    This report describes the technical progress made by the Western Research Institute of the University of Wyoming Research Institute of the University of Wyoming Research Corporation on work performed for the period October 1, 1987 through September 30, 1988. This research involves five resource areas: oil shale, tar sand, underground coal gasification, advanced process technology, and advanced fuels research. Under the terms of the cooperative agreement, an annual project plan has been approved by DOE. The work reported herein reflects the implementation of the research in the plan and follows the structure used therein. 49 refs., 32 figs., 87 tabs.

  6. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    Full Text Available Introduction: Cracking of earth dams is a one of the main threat causes of stability of embankment dams. In this research by modeling of the behavior of an embankment dam and employing conditions of the earthquake, the reasons of cracking were inspected using by modeling of earth dam behavior. Based on the literature, one of the main causes of dam failures is sliding and cracking of the dam structure during earthquake. Localized liquefaction of foundation soils was one of the causes of the observed post-earthquake distress within these dams. Material and Methods: In order to study the causes and the results of crack on earth dams, Mahmoodabad earthen dam with a height of 19 m, is located in Zanjan province, northwest of Iran, which suffered a longitudinal crack on the crest and slight sliding of the upstream slope due to 2001 Avaj earthquake was studied. This dam has faced earthquake two times with an interval of two years. During the first earthquake with the magnitude about 6.6 in Richter scale small longitudinal cracks had created on the crest. The developed cracks had been repaired by injecting the cement and then has been hidden by passing the time. After the second earthquake with the magnitude about 6.5 in Richter scale the hidden cracks had been appeared again and the slight movement of the upper slopes of dam reported. Based on the site investigation and documented information about dam, including maps and parameter data, the behavior of the dam has modeled by using Plaxis as a finite element model. In order to check the accuracy of the design of dam, the stability analysis has been conducted using by Xslope as a limit equilibrium model. The foundation conditions and the Geotechnical properties of the layer beneath the dam has been inspected by open excavation. Results and Discussion: Underground investigation about Geotechnical properties of dam foundation has showed that there is a thin sandy layer confined in alluvium material of the

  7. Cryptogamous plants lining the dam encircling Szeged

    Energy Technology Data Exchange (ETDEWEB)

    Galle, L

    1973-01-01

    Szeged, S. Hungary, is surrounded by an 8 km long dam covered with bricks, its surface 50,000 sq. m., the angle of inclination 45/sup 0/. On the brick surface there live 36 lichen species belonging to four lichen associations, nine moss and one algal species. The paper deals with the enumeration of cryptogamous coenoses, the growth form of the plants, the degree of annual growth of 5 various lichen species and the effect of the pollution of town air. The extent of coverage and the fructification of the single species are of lower degree in the coenoses in regions of more polluted air. 6 references, 2 tables.

  8. Dynamic decision making for dam-break emergency management - Part 2: Application to Tangjiashan landslide dam failure

    Science.gov (United States)

    Peng, M.; Zhang, L. M.

    2013-02-01

    Tangjiashan landslide dam, which was triggered by the Ms = 8.0 Wenchuan earthquake in 2008 in China, threatened 1.2 million people downstream of the dam. All people in Beichuan Town 3.5 km downstream of the dam and 197 thousand people in Mianyang City 85 km downstream of the dam were evacuated 10 days before the breaching of the dam. Making such an important decision under uncertainty was difficult. This paper applied a dynamic decision-making framework for dam-break emergency management (DYDEM) to help rational decision in the emergency management of the Tangjiashan landslide dam. Three stages are identified with different levels of hydrological, geological and social-economic information along the timeline of the landslide dam failure event. The probability of dam failure is taken as a time series. The dam breaching parameters are predicted with a set of empirical models in stage 1 when no soil property information is known, and a physical model in stages 2 and 3 when knowledge of soil properties has been obtained. The flood routing downstream of the dam in these three stages is analyzed to evaluate the population at risk (PAR). The flood consequences, including evacuation costs, flood damage and monetized loss of life, are evaluated as functions of warning time using a human risk analysis model based on Bayesian networks. Finally, dynamic decision analysis is conducted to find the optimal time to evacuate the population at risk with minimum total loss in each of these three stages.

  9. Simulation of hanging dams downstream of Ossauskoski power plant

    Energy Technology Data Exchange (ETDEWEB)

    Aaltonen, J.; Huokuna, M. [Finnish Environment Inst., Helsinki (Finland); Severinkangas, K.; Talvensaari, M. [Kemijoki Oy, Rovaniemi (Finland)

    2008-07-01

    Sixteen power plants have been constructed along Finland's Kemijoki River for hydroelectric power production. The Ossauskoski facility has recently undergone major renovations and upgrade, making it the sixth largest hydroelectric power plant in Finland, with a new capacity of 124 MW and an annual energy output of 501 GWh. The increase in power output and discharge may cause changes in ice conditions downstream of the power plant. The section of the river is already subjected to frazil ice problems and hanging dam formation. Discharges and adverse effects of frazil ice phenomena are likely to increase due to climate change, resulting in harm for hydropower production and the environment, particularly in flow regulated rivers where winter discharges are higher than natural discharges. As such, a study was launched to investigate a dredge plan suggested by by the electric utility Kemijoki Oy. The project involved mapping the river bed topography to identify the location and extent of hanging dams. A sounding device and ground penetrating radar was used to find the thaw regions in the ice cover. The JJT numerical river ice model was effectively used to study the effect of hanging dams on water levels. However, the ice bridging phenomena was not modelled in a reliable way by the JJT model and will be modelled in the future using the CRISSP2D numerical model. 5 refs., 11 figs.

  10. Annual report of waste generation and pollution prevention progress, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This Report summarizes the waste generation and pollution prevention activities of the major operational sites in the Department of Energy (DOE). We are witnessing progress in waste reduction from routine operations that are the focus of Department-wide reduction goals set by the Secretary on May 3,1996. The goals require that by the end of 1999, we reduce, recycle, reuse, and otherwise avoid waste generation to achieve a 50 percent reduction over 1993 levels. This Report provides the first measure of our progress in waste reduction and recycling against our 1993 waste generation baseline. While we see progress in reducing waste from our normal operations, we must begin to focus attention on waste generated by cleanup and facilities stabilization activities that are the major functions of the Office of Environmental Management. Reducing the generation of waste is one of the seven principles that I have established for the Office of Environmental Management Ten Year Plan. As part of our vision to complete a major portion of the environmental cleanup at DOE sites over the next ten years, we must utilize the potential of the pollution prevention program to reduce the cost of our cleanup program. We have included the Secretarial goals as part of the performance measures for the Ten Year Plan, and we are committed to implementing pollution prevention ideas. Through the efforts of both Federal and contractor employees, our pollution prevention program has reduced waste and the cost of our operations. I applaud their efforts and look forward to reporting further waste reduction progress in the next annual update of this Report.

  11. Annual report of waste generation and pollution prevention progress, 1994

    International Nuclear Information System (INIS)

    1996-09-01

    This Report summarizes the waste generation and pollution prevention activities of the major operational sites in the Department of Energy (DOE). We are witnessing progress in waste reduction from routine operations that are the focus of Department-wide reduction goals set by the Secretary on May 3,1996. The goals require that by the end of 1999, we reduce, recycle, reuse, and otherwise avoid waste generation to achieve a 50 percent reduction over 1993 levels. This Report provides the first measure of our progress in waste reduction and recycling against our 1993 waste generation baseline. While we see progress in reducing waste from our normal operations, we must begin to focus attention on waste generated by cleanup and facilities stabilization activities that are the major functions of the Office of Environmental Management. Reducing the generation of waste is one of the seven principles that I have established for the Office of Environmental Management Ten Year Plan. As part of our vision to complete a major portion of the environmental cleanup at DOE sites over the next ten years, we must utilize the potential of the pollution prevention program to reduce the cost of our cleanup program. We have included the Secretarial goals as part of the performance measures for the Ten Year Plan, and we are committed to implementing pollution prevention ideas. Through the efforts of both Federal and contractor employees, our pollution prevention program has reduced waste and the cost of our operations. I applaud their efforts and look forward to reporting further waste reduction progress in the next annual update of this Report

  12. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Loffink, Ken; Duke, Bill

    2008-12-31

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from June 7, 2007 to August 11, 2008. A total of 3,133 summer steelhead (Oncorhynchus mykiss); 1,487 adult, 1,067 jack, and 999 subjack fall Chinook (O. tshawytscha); 5,140 adult and 150 jack coho (O. kisutch); and 2,009 adult, 517 jack, and 128 subjack spring Chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 1,442 summer steelhead and 88 adult and 84 jack spring Chinook were hauled upstream from Threemile Dam. There were 1,497 summer steelhead; 609 adult, 1,018 jack and 979 subjack fall Chinook; 5,036 adult and 144 jack coho; and 1,117 adult, 386 jack and 125 subjack spring Chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 110 summer steelhead; 878 adult and 43 jack fall Chinook; and 560 adult and 28 jack spring Chinook were collected as broodstock for the Umatilla River hatchery program. In addition, there were 241 adult and 15 jack spring Chinook collected at Threemile Dam for outplanting in the South Fork Walla Walla River and Mill Cr, a tributary of the mainstem Walla Walla River. The Westland Canal juvenile facility (Westland), located near the town of Echo at river mile (RM) 27, is the major collection point for out-migrating juvenile salmonids and steelhead kelts. The canal was open for 158 days between February 11, 2008 and July 18, 2008. During that period, fish were bypassed back to the river 150 days and were trapped 6 days. There were also 2 days when fish were directed into and held in the canal forebay between the time the bypass was closed and the trap opened. An estimated 64 pounds of fish were transported from the Westland trapping facility. Approximately 25.8% of the fish transported were salmonids. In addition, one

  13. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  14. Health physics division annual progress report for period ending June 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-07-01

    This annual progress report follows, as in the past, the organizational structure of the Health Physics Division. Each part is a report of work done by a section of the division: Assessment and Technology Section (Part I), headed by H.W. Dickson; Biological and Radiation Physics Section (Part II), H.A. Wright; Chemical Physics and Spectroscopy Section (Part III), W.R. Garrett; Emergency Technology Section (Part IV), C.V. Chester, Medical Physics and Internal Dosimetry Section (Part V), K.E. Cowser; and the Analytic Dosimetry and Education Group (Part VI), J.E. Turner.

  15. FY2009 Annual Progress Report for Advanced Combustion Engine Research and Development

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2009-12-01

    Fiscal Year 2009 Annual Progress Report for the Advanced Combustion Engine Research and Development (R&D) subprogram. The Advanced Combustion Engine R&D subprogram supports the mission of the VTP program by removing the critical technical barriers to commercialization of advanced internal combustion engines (ICEs) for passenger and commercial vehicles that meet future Federal emissions regulations. Dramatically improving the efficiency of ICEs and enabling their introduction in conventional as well as hybrid electric vehicles is the most promising and cost-effective approach to increasing vehicle fuel economy over the next 30 years.

  16. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  17. Dam risk reduction study for a number of large tailings dams in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Verma, N. [AMEC Earth and Environmental Ltd., Mississauga, ON (Canada); Small, A. [AMEC Earth and Environmental Ltd., Fredericton, NB (Canada); Martin, T. [AMEC Earth and Environmental, Burnaby, BC (Canada); Cacciotti, D. [AMEC Earth and Environmental Ltd., Sudbury, ON (Canada); Ross, T. [Vale Inco Ltd., Sudbury, ON (Canada)

    2009-07-01

    This paper discussed a risk reduction study conducted for 10 large tailings dams located at a central tailings facility in Ontario. Located near large industrial and urban developments, the tailings dams were built using an upstream method of construction that did not involve beach compaction or the provision of under-drainage. The study provided a historical background for the dam and presented results from investigations and instrumentation data. The methods used to develop the dam configurations were discussed, and remedial measures and risk assessment measures used on the dams were reviewed. The aim of the study was to address key sources of risk, which include the presence of high pore pressures and hydraulic gradients; the potential for liquefaction; slope instability; and the potential for overtopping. A borehole investigation was conducted and piezocone probes were used to obtain continuous data and determine soil and groundwater conditions. The study identified that the lower portion of the dam slopes were of concern. Erosion gullies could lead to larger scale failures, and elevated pore pressures could lead to the risk of seepage breakouts. It was concluded that remedial measures are now being conducted to ensure slope stability. 6 refs., 1 tab., 6 figs.

  18. Annual variation of hematology and plasma chemistry in shortnose sturgeon, Acipenser brevirostrum, during a dam-impeded spawning run.

    Science.gov (United States)

    Matsche, Mark A; Gibbons, Jarrett

    2012-12-01

    Shortnose sturgeon (Acipenser brevirostrum) spawning migrations on the Cooper River are impeded by Pinopolis Dam, Lake Moultrie, South Carolina. Sturgeon and other species aggregate below the dam in late winter/early spring and are subjected to a variety of stressors stemming from crowding, poor habitat quality, and injuries that appear to be caused by boat propeller or turbine strikes. Spawning has been documented in the tailrace, but reproductive success has not been verified as no juveniles have been captured. Fish within the dam tailrace were captured by gill net during winter, 2005 and 2007-2011, and physiological condition was assessed using a panel of hematologic and biochemical indices. Plasma phosphorus and calcium were significantly higher in females, while PCV and aspartate aminotransferase were significantly higher in males, indicating sex-specific physiological changes triggered during maturity. A marked leucopenia, accompanied by lymphopenia and neutrophilia, was evident in both sexes and was consistent across years, indicating that these fish were under chronic stress. Testosterone and estradiol levels and hematologic and biochemical reference intervals are provided for comparative purposes.

  19. The Effects of Dams on Downstream Channel Characteristics in Pennsylvania and Maryland: Assessing the Potential Consequences of Dam Removal

    Science.gov (United States)

    Skalak, K. J.; Pizzuto, J. E.; Jenkins, P.

    2003-12-01

    The potential downstream effects of dam removal were assessed on fifteen sites of varying dam size and characteristics in Pennsylvania and Maryland. The dams ranged in size from a 30 cm high fish weir to a water supply dam 57 m high. Stream order ranged from 1 to 4. The dams are located in watersheds with varying degrees of human disturbance and urbanization. The dams are also operated differently, with significant consequences for hydraulic residence time and downstream flow variability. Most streams were alluvial, but 6 of the reaches were clearly bedrock channels. We hypothesize that the channel upstream, which is unaffected by the dam, will provide an accurate model for the channel downstream of the dam long after dam removal. Therefore, reaches upstream and downstream of the dam were compared to determine the effects of the dam as well as the condition of the stream that will ultimately develop decades after dam removal. Surprisingly, the dams had no consistent influence on channel morphology. However, the percentage of sand is significantly lower downstream than upstream: the mean % sand downstream is 11.47%, while the mean % sand upstream is 21.39%. The coarser fractions of the bed, as represented by the 84th percentile grain diameter, are unaffected by the presence of the dam. These results imply that decades after dam removal, the percentage of sand on the bed will increase, but the coarse fraction of the bed will remain relatively unchanged.

  20. Fish monitoring project -- Oregon: Smolt monitoring activities at Little Goose Dam in 1996. Annual Report 1996

    International Nuclear Information System (INIS)

    Setter, A.

    1998-01-01

    The juvenile fish facility at Little Goose Dam is operated seasonally to collect and bypass downstream migrating smolts and keep them from passing through the turbine blades. Fish are diverted from turbines by traveling screens as they sound in the forebay to pass the dam. A small percentage of the passing fish are sampled on a daily basis to provide information on fish condition, species composition, migration timing, and size distribution. Oregon Department of Fish and Wildlife personnel perform daily fish sampling and data collection. Physical operation of the facility is the responsibility of the US Army Corps of Engineers. Data is reported to the Fish Passage Center daily by means of electronic data transfer. Funding for this project was provided through the Smolt Monitoring Program administered by the Fish Passage Center. Overall, the number of fish collected and sampled in 1996 was a reduction from the previous years of operation. The 1996 migration season was characterized by higher than average flows and greater spill frequency at the dam. It was the first year that coho salmon were obtained in the sample. The predominant species collected was steelhead with hatchery fish outnumbering wild fish by a ratio of 8:1. An increased emphasis was placed on gas bubble trauma examination and a routine, consistent effort was implemented using a protocol established by the Fish Passage Center. The objective of the gas bubble trauma (GBT) examinations was to document the relative incidence of symptoms throughout the migration season

  1. Public safety around dams guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, T [Canadian Dam Association, Edmonton, AB (Canada)

    2010-07-01

    This presentation discussed Canadian and international initiatives for improving dam safety and described some of the drivers for the development of new Canadian Dam Association (CDA) public safety guidelines for dams. The CDA guidelines were divided into the following 3 principal sections: (1) managed system elements, (2) risk assessment and management, and (3) technical bulletins. Public and media responses to the drownings have called for improved safety guidelines. While the public remains unaware of the hazards of dams, public interaction with dams is increasing as a result of interest in extreme sports and perceived rights of access. Guidelines are needed for dam owners in order to provide due diligence. Various organizations in Canada are preparing technical and public safety dam guidelines. CDA guidelines have also been prepared for signage, booms and buoys, and audible and visual alerts bulletins. Working groups are also discussing recommended practices for spill procedures, spillways and the role of professional engineers in ensuring public safety. Methods of assessing risk were also reviewed. Managed system elements for risk assessment and public interactions were also discussed, and stepped control measures were presented. tabs., figs.

  2. Odelouca Dam Construction: Numerical Analysis

    OpenAIRE

    Brito, A.; Maranha, J. R.; Caldeira, L.

    2012-01-01

    Odelouca dam is an embankment dam, with 76 m height, recently constructed in the south of Portugal. It is zoned with a core consisting of colluvial and residual schist soil and with soil-rockfill mixtures making up the shells (weathered schist with a significant fraction of coarse sized particles). This paper presents a numerical analysis of Odelouca Dam`s construction. The material con-stants of the soil model used are determined from a comprehensive testing programme carried out in the C...

  3. Effect of a dam on epilithic algal communities of a mountain stream: before-after dam construction comparison

    Directory of Open Access Journals (Sweden)

    Luciana Cibils Martina

    2013-02-01

    Full Text Available In this study we evaluated the effect of a dam on epilithic algal communities by analyzing community response after dam construction and by comparing community composition, structure and biomass upstream and downstream of the dam. Samples of epilithic algae and environmental data were collected at each site during high and low water periods before and after dam construction in Achiras Stream (Córdoba, Argentina. Ordinations showed modifications in algal assemblages after dam construction and downstream of the dam. Ordinations also suggested a loss of seasonality at the downstream site since the assemblages were similar between hydrological periods after dam construction. Indicator species, obtained by the Indicator Value method, showed that, after dam construction, there could have been an increase in nutrient concentration and a release of plankton from the impoundment. Abundance, richness and diversity were altered after dam construction as assessed by ANOVAs derived from a modified BACI Design. Proportion of early-successional species was higher at the upstream site while late-successional species were dominant at the downstream site, as predicted. Lower fluctuations in discharge downstream of the dam may have helped succession advance, whereas at the upstream site, mainly during the high water period, floods could have caused sloughing of life forms from the outer layers of the biofilm, resetting the algal community to early successional stages. It may be concluded that the dam affected algal community and favored succession advance mainly by reducing current velocity and flow fluctuations.

  4. Soil erosion and sediment yield, a double barrel problem in South Africa's only large river network without a dam

    Science.gov (United States)

    Le Roux, Jay

    2016-04-01

    Soil erosion not only involves the loss of fertile topsoil but is also coupled with sedimentation of dams, a double barrel problem in semi-arid regions where water scarcity is frequent. Due to increasing water requirements in South Africa, the Department of Water and Sanitation is planning water resource development in the Mzimvubu River Catchment, which is the only large river network in the country without a dam. Two dams are planned including a large irrigation dam and a hydropower dam. However, previous soil erosion studies indicate that large parts of the catchment is severely eroded. Previous studies, nonetheless, used mapping and modelling techniques that represent only a selection of erosion processes and provide insufficient information about the sediment yield. This study maps and models the sediment yield comprehensively by means of two approaches over a five-year timeframe between 2007 and 2012. Sediment yield contribution from sheet-rill erosion was modelled with ArcSWAT (a graphical user interface for SWAT in a GIS), whereas gully erosion contributions were estimated using time-series mapping with SPOT 5 imagery followed by gully-derived sediment yield modelling in a GIS. Integration of the sheet-rill and gully results produced a total sediment yield map, with an average of 5 300 t km-2 y-1. Importantly, the annual average sediment yield of the areas where the irrigation dam and hydropower dam will be built is around 20 000 t km-2 y-1. Without catchment rehabilitation, the life expectancy of the irrigation dam and hydropower dam could be 50 and 40 years respectively.

  5. Lake Roosevelt Fisheries Evaluation Program; Limnological and Fisheries Monitoring, Annual Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chuck; Scofield, Ben; Pavlik, Deanne

    2003-03-01

    A slightly dryer than normal year yielded flows in Lake Roosevelt that were essentially equal to the past ten year average. Annual mean inflow and outflow were 3,160.3 m3/s and 3,063.4 m3/s respectively. Mean reservoir elevation was 387.2 m above sea level at the Grand Coulee Dam forebay. The forebay elevation was below the mean elevation for a total of 168 days. During the first half of the 2000 forebay elevation changed at a rate of 0.121 m/d and during the last half changed at a rate of 0.208 m/d. The higher rate of elevation change earlier in the year is due to the drawdown to accommodate spring runoff. Mean annual water retention time was 40 days. Annual mean total dissolved gas was 108%. Total dissolved gas was greatest at upriver locations (110% = US/Canada Border annual mean) and decreased moving toward Grand Coulee Dam (106% = Grand Coulee Dam Forebay annual mean). Total dissolved gas was greatest in May (122% reservoir wide monthly mean). Gas bubble trauma was observed in 16 fish primarily largescale suckers and was low in severity. Reservoir wide mean temperatures were greatest in August (19.5 C) and lowest in January (5.5 C). The Spokane River and Sanpoil River Arms experienced higher temperatures than the mainstem reservoir. Brief stratification was observed at the Sanpoil River shore location in July. Warm water temperatures in the Spokane Arm contributed to low dissolved oxygen concentrations in August (2.6 mg/L at 33 m). However, decomposition of summer algal biomass was likely the main cause of depressed dissolved oxygen concentrations. Otherwise, dissolved oxygen profiles were relatively uniform throughout the water column across other sampling locations. Annual mean Secchi depth throughout the reservoir was 5.7 m. Nutrient concentrations were generally low, however, annual mean total phosphorus (0.016 mg/L) was in the mesotrophic range. Annual mean total nitrogen was in the meso-oligotrophic range. Total nitrogen to total phosphorus ratios were

  6. 78 FR 77397 - Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas

    Science.gov (United States)

    2013-12-23

    ... Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas AGENCY: U.S. Army Corps... Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas. In 1997, the Lower Colorado River... regulations to reflect changes in ownership and responsibilities of flood control management of Marshall Ford...

  7. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  8. New guidelines for dam safety classification

    International Nuclear Information System (INIS)

    Dascal, O.

    1999-01-01

    Elements are outlined of recommended new guidelines for safety classification of dams. Arguments are provided for the view that dam classification systems should require more than one system as follows: (a) classification for selection of design criteria, operation procedures and emergency measures plans, based on potential consequences of a dam failure - the hazard classification of water retaining structures; (b) classification for establishment of surveillance activities and for safety evaluation of dams, based on the probability and consequences of failure - the risk classification of water retaining structures; and (c) classification for establishment of water management plans, for safety evaluation of the entire project, for preparation of emergency measures plans, for definition of the frequency and extent of maintenance operations, and for evaluation of changes and modifications required - the hazard classification of the project. The hazard classification of the dam considers, as consequence, mainly the loss of lives or persons in jeopardy and the property damages to third parties. Difficulties in determining the risk classification of the dam lie in the fact that no tool exists to evaluate the probability of the dam's failure. To overcome this, the probability of failure can be substituted for by a set of dam characteristics that express the failure potential of the dam and its foundation. The hazard classification of the entire project is based on the probable consequences of dam failure influencing: loss of life, persons in jeopardy, property and environmental damage. The classification scheme is illustrated for dam threatening events such as earthquakes and floods. 17 refs., 5 tabs

  9. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  10. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the Interior, through his agent, the Lower Colorado River Authority (LCRA) shall operate the Marshall Ford Dam...

  11. Excavation of the Surikamigawa dam diversion tunnel. Surikamigawa dam karihaisui tunnel kantsu

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, T.; Konno, T. (Ministry of Construction, Tokyo (Japan))

    1994-04-01

    A bypass tunnel construction has been completed at the Surikamigawa dam (Japan). This paper describes the summary of the construction. The full-swing dam construction work is scheduled to begin in 1995. The soils distributed near the dam site consist of lapillus tuff containing andesite-based light stones and tuff-based conglomerates containing large gravels. Excavation of the dam diversion tunnel has used a blasting method, and the tunnel construction has adopted an automatic tunnel cross section marking system and a non-electric explosion method. This marking system is a system to irradiate a laser beam onto the facing to depict excavation lines that realizes labor saving and high-accuracy excavation. The error at the tunnel completion was found 20 mm. The non-electric explosion method ignites a coated explosive layer with an impact wave, which is electrostatically safe, and reduces blasting vibration. Electric detonators have also been used because of using ANFO explosives. The result obtained from measurements of inner space displacement necessary for the blasting process has indicated that the area near the dam site consists of stable mountains. 6 figs., 4 tabs.

  12. Three Sisters Dam modifications and performance

    Energy Technology Data Exchange (ETDEWEB)

    Courage, L.J.R. [Monenco AGRA Inc., Calgary, AB (Canada)

    1995-12-31

    Recent modifications and maintenance carried out at the Three Sisters Dam, in the Alberta Rockies south of the town of Canmore, were described. A detailed account was given of the dam`s geological setting, its abnormally high leakage through the foundation and its sinkhole activity. Results of studies aimed at finding the cause of leakage and sinkhole occurrences were reviewed. Modifications made to the dam since 1951 were detailed, as were modifications to handle probable maximum flood levels. Three approaches for estimating failure probabilities after identification of failure modes were described. The overall conclusion was that based on constant leakage, no settlement in the dam, penstocks, or the powerhouse since construction, the Three Sisters Dam was stable. 1 ref.

  13. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  14. Health impacts of large dams

    International Nuclear Information System (INIS)

    Lerer, L.B.

    1999-01-01

    Large dams have been criticized because of their negative environmental and social impacts. Public health interest largely has focused on vector-borne diseases, such as schistosomiasis, associated with reservoirs and irrigation projects. Large dams also influence health through changes in water and food security, increases in communicable diseases, and the social disruption caused by construction and involuntary resettlement. Communities living in close proximity to large dams often do not benefit from water transfer and electricity generation revenues. A comprehensive health component is required in environmental and social impact assessments for large dam projects

  15. Effects of the Operation of Hungry Horse Dam on the Kokanee Fishery in the Flathead River System, 1984 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.

    1984-12-01

    This study assessed the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. This report covers the 1983-84 field season concerning the effects of Hungry Horse operations on kokanee abundance and reproductive success in the upper Flathead River system. This report also addresses the projected recovery of the main stem kokanee run under the flow regime recommended by the Department of Fish, Wildlife and Parks and implemented by the Bureau of Reclamation and Bonneville Power Administration in 1982. An estimated 58,775 kokanee reached spawning grounds in the Flathead River System in 1983. The 1983 spawning run was composed of 92% age III + fish, as compared to an average of 80% from 1972-1983. A total of 6883 kokanee redds were enumerated in the main stem Flathead River in 1983. A total of 2366 man-days of angling pressure was estimated during the 1983 kokanee lure fishery in the Flathead River system. Estimated numbers of fry emigrating from McDonald Creek, the Whitefish River and Brenneman's Slough were 13,100,000, 66,254 and 37,198, yielding egg to fry survival rates of 76%, 10.4% and 19.2%.

  16. Deformation performance of Waba Dam

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, T.; Bhardwaj, V.; Hassan, P. [Ontario Power Generation, Niagara-on-the-Lake, ON (Canada); Cragg, C. [Cragg Consulting Services, Toronto, ON (Canada)

    2009-07-01

    This paper described the performance of the Waba Dam which is being monitored as part of Ontario Power Generation's Dam Safety Program. It described the deformations that have been observed in this 3600 ft long earthfill dam which lies on marine clay in eastern Ontario. An extensive instrumentation program, including foundation settlement gauges, surface monuments, slope inclinometers, load cells and piezometers has been in effect since the construction of the dam in 1975. Significant settlement has occurred at Waba Dam since its construction. Wide berms were provided upstream and downstream beyond the slopes of the main fill to ensure stability of the dyke on the soft clay foundation and the crest elevations were designed to allow for the expected settlement in the foundation which would be overstressed by the dam loading. Based on current settlements, future settlements are predicted based on Asaoka's method. Inclinometer measurements have shown a foundation lateral spreading of 12 in. The lateral versus vertical deformations were found to be comparable to well behaving embankments reported in the literature. These analyses indicate that Waba Dam is performing well and should continue to perform well into the future. 8 refs., 1 tab., 14 figs.

  17. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  18. Risø annual report 2001

    DEFF Research Database (Denmark)

    2002-01-01

    In this annual report, we present a small selection of Risø’s achievements in 2001. A more detailed review of Risø’s projects can be found in the Risø Annual Accounts for 2001 as well as in the annual progress reports prepared by the individual researchdepartments.......In this annual report, we present a small selection of Risø’s achievements in 2001. A more detailed review of Risø’s projects can be found in the Risø Annual Accounts for 2001 as well as in the annual progress reports prepared by the individual researchdepartments....

  19. Malaria and large dams in sub-Saharan Africa: future impacts in a changing climate.

    Science.gov (United States)

    Kibret, Solomon; Lautze, Jonathan; McCartney, Matthew; Nhamo, Luxon; Wilson, G Glenn

    2016-09-05

    Sub-Saharan Africa (SSA) has embarked on a new era of dam building to improve food security and promote economic development. Nonetheless, the future impacts of dams on malaria transmission are poorly understood and seldom investigated in the context of climate and demographic change. The distribution of malaria in the vicinity of 1268 existing dams in SSA was mapped under the Intergovernmental Panel on Climate Change (IPCC) representative concentration pathways (RCP) 2.6 and 8.5. Population projections and malaria incidence estimates were used to compute population at risk of malaria in both RCPs. Assuming no change in socio-economic interventions that may mitigate impacts, the change in malaria stability and malaria burden in the vicinity of the dams was calculated for the two RCPs through to the 2080s. Results were compared against the 2010 baseline. The annual number of malaria cases associated with dams and climate change was determined for each of the RCPs. The number of dams located in malarious areas is projected to increase in both RCPs. Population growth will add to the risk of transmission. The population at risk of malaria around existing dams and associated reservoirs, is estimated to increase from 15 million in 2010 to 21-23 million in the 2020s, 25-26 million in the 2050s and 28-29 million in the 2080s, depending on RCP. The number of malaria cases associated with dams in malarious areas is expected to increase from 1.1 million in 2010 to 1.2-1.6 million in the 2020s, 2.1-3.0 million in the 2050s and 2.4-3.0 million in the 2080s depending on RCP. The number of cases will always be higher in RCP 8.5 than RCP 2.6. In the absence of changes in other factors that affect transmission (e.g., socio-economic), the impact of dams on malaria in SSA will be significantly exacerbated by climate change and increases in population. Areas without malaria transmission at present, which will transition to regions of unstable transmission, may be worst affected

  20. Annual progress report

    International Nuclear Information System (INIS)

    Russek, A.

    1975-06-01

    Progress has been made in calculation of cross-sections for dielectronic and radiative recombination when hot electrons are incident on partially stripped impurity ions. Calculations were completed for the cases of 1 keV and 10 keV electrons incident on ions of arbitrary Z with ionization state consistent with a 1 keV plasma temperature. It was found that dielectronic recombination dominates radiative recombination by a factor of 100 at 1 keV incident electron energy to a factor of 1000 at 10 keV incident electron energy. The work is now being extended to other plasma temperatures and is being improved by more accurate calculation of the matrix elements involved. Progress was also made in the calculation of accurate bremsstrahlung and higher order radiative processes which also occur when hot electrons are incident on partially stripped impurity ions. Formal expressions for the matrix elements have been obtained for cross-sections in a fully relativistic partial wave analysis for bremsstrahlung radiation both with and without electron excitation of the target ion. Final evaluation now awaits the evaluation of the relativistic radial integrals involved in these matrix elements. (U.S.)

  1. Numerical Simulation of Missouri River Bed Evolution Downstream of Gavins Point Dam

    Science.gov (United States)

    Sulaiman, Z. A.; Blum, M. D.; Lephart, G.; Viparelli, E.

    2016-12-01

    The Missouri River originates in the Rocky Mountains in western Montana and joins the Mississippi River near Saint Louis, Missouri. In the 1900s dam construction and river engineering works, such as river alignment, narrowing and bank protections were performed in the Missouri River basin to control the flood flows, ensure navigation and use the water for agricultural, industrial and municipal needs, for the production of hydroelectric power generation and for recreation. These projects altered the flow and the sediment transport regimes in the river and the exchange of sediment between the river and the adjoining floodplain. Here we focus on the long term effect of dam construction and channel narrowing on the 1200 km long reach of the Missouri River between Gavins Point Dam, Nebraska and South Dakota, and the confluence with the Mississippi River. Field observations show that two downstream migrating waves of channel bed degradation formed in this reach in response to the changes in flow regime, sediment load and channel geometry. We implemented a one dimensional morphodynamic model for large, low slope sand bed rivers, we validated the model at field scale by comparing the numerical results with the available field data and we use the model to 1) predict the magnitude and the migration rate of the waves of degradation at engineering time scales ( 150 years into the future), 2) quantify the changes in the sand load delivered to the Mississippi River, where field observations at Thebes, i.e. downstream of Saint Louis, suggest a decline in the mean annual sand load in the past 50 years, and 3) identify the role of the main tributaries - Little Sioux River, Platte River and Kansas River - on the wave migration speed and the annual sand load in the Missouri River main channel.

  2. Spokane Tribal Hatchery, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2006-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting harvestable fisheries for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). The Spokane Tribe, Washington Department of Fish and Wildlife, Colville Confederated Tribes and Lake Roosevelt Development Association/Lake Roosevelt Volunteer Net Pen Project are cooperating in a comprehensive artificial production program to produce kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) for annual releases into the project area. The program consists of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and Lake Roosevelt Rainbow Trout Net Pen Rearing Projects. The Lake Roosevelt and Banks Lake Fisheries Evaluation Program monitor and evaluates release strategies and production methods for the aforementioned projects. Between 1985 and 2005 the projects have collectively produced up to 800,000 rainbow trout and 4 million kokanee salmon for release into Lake Roosevelt and 1.4 million kokanee fry for Banks Lake annually. In 2005, the annual release goal included 3.3 million kokanee fry, 475,000 kokanee yearlings and 500,000 rainbow trout yearlings. Fish produced by this project in 2005 to meet collective fish production and release goals included: 3,446,438 kokanee fingerlings, 347,730 rainbow trout fingerlings and 525,721 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Meadow Creek and Lake Whatcom kokanee, diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and

  3. Fragility Analysis of Concrete Gravity Dams

    Science.gov (United States)

    Tekie, Paulos B.; Ellingwood, Bruce R.

    2002-09-01

    Concrete gravity dams are an important part ofthe nation's infrastructure. Many dams have been in service for over 50 years, during which time important advances in the methodologies for evaluation of natural phenomena hazards have caused the design-basis events to be revised upwards, in some cases significantly. Many existing dams fail to meet these revised safety criteria and structural rehabilitation to meet newly revised criteria may be costly and difficult. A probabilistic safety analysis (PSA) provides a rational safety assessment and decision-making tool managing the various sources of uncertainty that may impact dam performance. Fragility analysis, which depicts fl%e uncertainty in the safety margin above specified hazard levels, is a fundamental tool in a PSA. This study presents a methodology for developing fragilities of concrete gravity dams to assess their performance against hydrologic and seismic hazards. Models of varying degree of complexity and sophistication were considered and compared. The methodology is illustrated using the Bluestone Dam on the New River in West Virginia, which was designed in the late 1930's. The hydrologic fragilities showed that the Eluestone Dam is unlikely to become unstable at the revised probable maximum flood (PMF), but it is likely that there will be significant cracking at the heel ofthe dam. On the other hand, the seismic fragility analysis indicated that sliding is likely, if the dam were to be subjected to a maximum credible earthquake (MCE). Moreover, there will likely be tensile cracking at the neck of the dam at this level of seismic excitation. Probabilities of relatively severe limit states appear to be only marginally affected by extremely rare events (e.g. the PMF and MCE). Moreover, the risks posed by the extreme floods and earthquakes were not balanced for the Bluestone Dam, with seismic hazard posing a relatively higher risk.

  4. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  5. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.; McKinstry, C.; Simmons, C. (Pacific Northwest National Laboratory)

    2003-01-01

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the second year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The 2002 study period extended from May 18 through July 30. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. The prototype system consisted of six strobe lights affixed to an aluminum frame suspended vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, were aimed to illuminate a specific region directly upstream of the barge. Three light level treatments were used: 6 of 6 lights on, 3 of 6 lights on, and all lights off. These three treatment conditions were applied for an entire 24-hr day and were randomly assigned within a 3-day block throughout the study period. A seven

  6. Matahina Dam : lessons learned from an earthquake-related internal erosion incident at the Matahina Dam, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Gillon, M. [Damwatch Services Ltd., Wellington (New Zealand)

    2009-07-01

    This case history discussed internal erosion damage and crest subsidence caused by an earthquake at the Matahina Dam in New Zealand. The study showed that cracking and internal erosion was initiated during the 1967 reservoir filling operation. Located in an area of active volcanism and faulting, the dam is located on a river with extensive erosion through an ignimbrite flow. The dam's core is founded on compact Tertiary age sediments overlain by sand and gravel deposits beneath the shoulders of the dam. The earthquake caused a rupture along an unidentified fault trace 12 km from the dam. The horizontal base acceleration recorded at the dam was 3.25 m/s. Transverse cracking was observed at each abutment, and deformations were observed in the rockfill. An investigation program was conducted to determine the dam's integrity. Piezometer measurements showed widespread fluctuations. It was concluded that the lack of an effective filter was a significant design omission. 12 refs., 12 figs.

  7. Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot.

    Science.gov (United States)

    Kano, Yuichi; Dudgeon, David; Nam, So; Samejima, Hiromitsu; Watanabe, Katsutoshi; Grudpan, Chaiwut; Grudpan, Jarungjit; Magtoon, Wichan; Musikasinthorn, Prachya; Nguyen, Phuong Thanh; Praxaysonbath, Bounthob; Sato, Tomoyuki; Shibukawa, Koichi; Shimatani, Yukihiro; Suvarnaraksha, Apinun; Tanaka, Wataru; Thach, Phanara; Tran, Dac Dinh; Yamashita, Tomomi; Utsugi, Kenzo

    2016-01-01

    Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world's largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10-20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased-particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more immediately pressing for

  8. Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot.

    Directory of Open Access Journals (Sweden)

    Yuichi Kano

    Full Text Available Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world's largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10-20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased-particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more

  9. Dam-breach analysis and flood-inundation mapping for selected dams in Oklahoma City, Oklahoma, and near Atoka, Oklahoma

    Science.gov (United States)

    Shivers, Molly J.; Smith, S. Jerrod; Grout, Trevor S.; Lewis, Jason M.

    2015-01-01

    Dams provide beneficial functions such as flood control, recreation, and storage of water supplies, but they also entail risk; dam breaches and resultant floods can cause substantial property damage and loss of life. The State of Oklahoma requires each owner of a high-hazard dam, which the Federal Emergency Management Agency defines as dams for which failure or improper operation probably will cause loss of human life, to develop an emergency action plan specific to that dam. Components of an emergency action plan are to simulate a flood resulting from a possible dam breach and map the resulting downstream flood-inundation areas. The resulting flood-inundation maps can provide valuable information to city officials, emergency managers, and local residents for planning an emergency response if a dam breach occurs.

  10. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam

    International Nuclear Information System (INIS)

    Nigro, A.A.

    1991-09-01

    We report on our progress from April 1990 through March 1991 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from NcNary Dam; to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam; to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams; and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights of results of this work in the Dalles, Bonneville and John Day reservoirs are included in the four pages included in this report

  11. Technical bulletin : structural considerations for dam safety

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    This technical bulletin discussed issues related to the safety assessment of concrete water-retaining structures and timber dams. Structures reviewed in the paper included gravity dams; buttress dams; arch dams; spillway structures; intake structures; power plants; roller compacted concrete dams; and timber dams. A variety of issues related to the loss of cohesive bond and discontinuities in bedrock foundations were reviewed with reference to issues related to compressive strength, tensile strength, and shear strength. Static failure modes and failure mechanisms related to dam failures were also described. Visual indicators for potential failures include abutment and foundation movement, seepage, and structure movements. Loading combinations were discussed, and performance indicators for gravity dams were provided. Methods of analysis for considering load characteristics, structure types and geological conditions were also discussed. Modelling techniques for finite element analysis were also included. 16 refs., 3 tabs., 5 figs.

  12. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  13. The socio-economics dynamics of Dam on Rural Communities: A case study of Oyan Dam, Nigeria

    Science.gov (United States)

    Ayeni, Amidu; Ojifo, Lawrence

    2018-06-01

    Dams construction and operations have many benefits, nevertheless, they have also led to lots of negative social, health and human impacts. It is based on this that this study assesses the potential and socio-economics dynamics of Oyan dam between 1980 and 2016. The data used for this study include water level and discharge records of the dam between 2007 and 2016, Landsat imageries of 1984 and 2016 and socio-economic datasets for the period. Analysis of the dam potentials (water supply, agriculture and hydropower) and socio-economic impacts of the dam were carried out using basic statistical tools, land use change anaysis and field survey using questionnaire, structured interview with major stakeholders and personal observation. The results revealed that the water level and storage of the Oyan dam had a relative reduction of about 2 % as well as non-stationarity pattern of water abstraction and production for the period. The landuse classes show all classes decreased in extent except the cultivated landuse that acrued an increased of 19.9 % between 1984 and 2016. Furthermore, commercial water supply varied significantly between 2010 and 2016 while irrigation scheme is grossly under-utilized from the inception in 1983 to 2016. Finally, the result of socio-economic impacts revealed that majority of the selected communities' members are actually not benefiting from the dam and their livelihoods are not from the dam.

  14. Sediment Transport Over Run-of-River Dams

    Science.gov (United States)

    O'Brien, M.; Magilligan, F. J.; Renshaw, C. E.

    2016-12-01

    Dams have numerous documented effects that can degrade river habitat downstream. One significant effect of large dams is their ability to trap sediment delivered from upstream. This trapping can alter sediment transport and grain size downstream - effects that often motivate dam removal decisions. However, recent indirect observations and modeling studies indicate that small, run-of-river (ROR) dams, which do not impede discharge, may actually leak sediment downstream. However, there are no direct measurements of sediment flux over ROR dams. This study investigates flow and sediment transport over four to six different New England ROR dams over a summer-fall field season. Sediment flux was measured using turbidity meters and tracer (RFID) cobbles. Sediment transport was also monitored through an undammed control site and through a river where two ROR dams were recently removed. These data were used to predict the conditions that contribute to sediment transport and trapping. Year 1 data show that tracer rocks of up to 61 mm were transported over a 3 m ROR dam in peak flows of 84% of bankfull stage. These tracer rocks were transported over and 10 m beyond the dam and continue to move downstream. During the same event, comparable suspended sediment fluxes of up to 81 g/s were recorded both upstream and downstream of the dam at near-synchronous timestamps. These results demonstrate the potential for sediment transport through dammed rivers, even in discharge events that do not exceed bankfull. This research elucidates the effects of ROR dams and the controls on sediment transport and trapping, contributions that may aid in dam management decisions.

  15. Hydraulics of embankment-dam breaching

    Science.gov (United States)

    Walder, J. S.; Iverson, R. M.; Logan, M.; Godt, J. W.; Solovitz, S.

    2012-12-01

    Constructed or natural earthen dams can pose hazards to downstream communities. Experiments to date on earthen-dam breaching have focused on dam geometries relevant to engineering practice. We have begun experiments with dam geometries more like those of natural dams. Water was impounded behind dams constructed at the downstream end of the USGS debris-flow flume. Dams were made of compacted, well-sorted, moist beach sand (D50=0.21 mm), 3.5 m from toe to toe, but varying in height from 0.5 to 1 m; the lower the dam, the smaller the reservoir volume and the broader the initially flat crest. Breaching was started by cutting a slot 30-40 mm wide and deep in the dam crest after filling the reservoir. Water level and pore pressure within the dam were monitored. Experiments were also recorded by an array of still- and video cameras above the flume and a submerged video camera pointed at the upstream dam face. Photogrammetric software was used to create DEMs from stereo pairs, and particle-image velocimetry was used to compute the surface-velocity field from the motion of tracers scattered on the water surface. As noted by others, breaching involves formation and migration of a knickpoint (or several). Once the knickpoint reaches the upstream dam face, it takes on an arcuate form whose continued migration we determined by measuring the onset of motion of colored markers on the dam face. The arcuate feature, which can be considered the head of the "breach channel", is nearly coincident with the transition from subcritical to supercritical flow; that is, it acts as a weir that hydraulically controls reservoir emptying. Photogenic slope failures farther downstream, although the morphologically dominant process at work, play no role at all in hydraulic control aside from rare instances in which they extend upstream so far as to perturb the weir, where the flow cross section is nearly self-similar through time. The domain downstream of the critical-flow section does influence

  16. Dam that social networking: connecting South Africa's major dams to social media

    CSIR Research Space (South Africa)

    Butgereit, L

    2011-10-01

    Full Text Available where four major South African dams are connected to Twitter and Facebook (and other social media such as MXit and Google Chat) in a mechanism which would be easy to replicate for additional dams or rivers. Data is supplied by the South African...

  17. The Impact of the Dachaoshan Dam on Seasonal Hydrological Dynamics in the Main Stream of the Mekong River

    Science.gov (United States)

    Kameyama, S.; Shimazaki, H.; Nohara, S.; Fukushima, M.; Kudo, K.; Sato, T.

    2008-12-01

    In the Mekong River watershed, traditional social and industrial systems have long existed in harmony with water and biological resources. Since the 1950s, many dam-construction projects have been started to develop power and water resources to meet increasing demand for energy and food production. Since the 1970s, there have been temporary interruptions to these projects because of civil war or regional volatility of international relations. Many of these projects have been restarted in the last 15 years. This raises international interest, as there are transboundary issues cross-border issues related to both development assistance and environmental conservation. By 2008, two Chinese dams had already been completed (the Manwan dam in 1996 and the Dachaoshan dam in 2003) on the Mekong River in Yunnan province. Dam construction has some positive impacts, such as electricity production, management of water resources, and flood control. However, upstream control of water discharge can have negative impacts on traditional agricultural systems and fisheries downstream from the dams, such as drastic changes in flow volume and sediment load. We used hydrological simulation of the watershed to quantify the impact of the construction of the Dachaoshan dam by comparing annual water discharge and sediment transport before and after the dam was completed. Our main objectives were to use watershed hydrologic modeling to simulate changes to annual hydrological parameters and sediment transport, and to map spatio-temporal changes of these data before and after dam construction. Our study area covered the part of the Mekong River main channel that extends about 100 km downstream from the junction of the borders of Myanmar, Thailand, and the Lao People's Democratic Republic. We used five data validation points at 25-km intervals along this section of the river and calculated model parameters every 1 km. The years we modeled were 1990 (began dam construction) and 2006 (after dam

  18. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  19. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  20. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1988-1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Dept. of Fish and Wildlife, Portland, OR (USA))

    1989-09-01

    We report on our progress from April 1988 through March 1989 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. Highlights of results of our work in the Dalles and Bonneville reservoirs are: using setlines, we caught 1,586 sturgeon in The Dalles Reservoir and 484 sturgeon in Bonneville Reservoir in 1988. Fork length of fish caught ranged from 34 cm to 274 cm. Of the fish caught we marked 1,248 in The Dalles Reservoir and 341 in Bonneville Reservoir. Of the fish marked in 1988, we recaptured 82 in The Dalles Reservoir and none in Bonneville Reservoir. We recaptured 89 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 35 fish marked in 1988 and 16 fish marked in 1987 in The Dalles Reservoir. Anglers recaptured 2 sturgeon marked in 1988 in Bonneville Reservoir. Individual papers were processed separately for the data base.

  1. Dams, Hydrology and Risk in Future River Management

    Science.gov (United States)

    Wegner, D. L.

    2017-12-01

    Across America there are over 80,000 large to medium dams and globally the number is in excess of 800,000. Currently there are over 1,400 dams and diversion structures being planned or under construction globally. In addition to these documented dams there are thousands of small dams populating watersheds. Governments, agencies, native tribes, private owners and regulators all have a common interest in safe dams. Often dam safety is characterized as reducing structural risk while providing for maximum operational flexibility. In the 1970's there were a number of large and small dam failures in the United States. These failures prompted the federal government to issue voluntary dam safety guidelines. These guidelines were based on historic information incorporated into a risk assessment process to analyze, evaluate and manage risk with the goal to improve the quality of and support of dam management and safety decisions. We conclude that historic and new risks need to be integrated into dam management to insure adequate safety and operational flexibility. A recent assessment of the future role of dams in the United States premises that future costs such as maintenance or removal beyond the economic design life have not been factored into the long-term operations or relicensing of dams. The converging risks associated with aging water storage infrastructure, multiple dams within watersheds and uncertainty in demands policy revisions and an updated strategic approach to dam safety. Decisions regarding the future of dams in the United States may, in turn, influence regional water planning and management. Leaders in Congress and in the states need to implement a comprehensive national water assessment and a formal analysis of the role dams play in our water future. A research and national policy agenda is proposed to assess future impacts and the design, operation, and management of watersheds and dams.

  2. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  3. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  4. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  5. 2000 Annual Progress Report for Fuels for Advanced CIDI Engines and Fuel Cells

    Energy Technology Data Exchange (ETDEWEB)

    Chalk, S.

    2000-12-11

    The Department of Energy's Office of Transportation Technologies Fiscal Year (FY) 2000 Annual Progress Report for the Fuels for Advanced CIDI Engines and Fuel Cells Program highlights progress achieved during FY 2000 and comprises 22 summaries of industry and National Laboratory projects that were conducted. The report provides an overview of the exciting work being conducted to tackle the tough technical challenges associated with developing clean burning fuels that will enable meeting the performance goals of the Emission Control R and D for Advanced CIDI Engines and the Transportation Fuel Cell Power Systems Programs. The summaries cover the effects of CIDI engine emissions and fuel cell power system performance, the effects of lubricants on engine emissions, the effects of fuel and consumed lubricants on exhaust emission control devices and the health and safety, materials compatibility, and economics of advanced petroleum-based fuels.

  6. Tailings dams stability analysis using numerical modelling of geotechnical and geophysical data

    Science.gov (United States)

    Mihai, S.; Zlagnean, M.; Oancea, I.; Petrescu, A.

    2009-04-01

    Methods for monitoring seepage and detecting internal erosion are essential for the safety evaluation of embankment dams. Internal erosion is one of the major reasons for embankment dam failures, and there are thousands of large tailings dams and waste-rock dumps in the world that may pe considered as hotspots for environmental impact. In this research the geophysical survey works were performed on Cetatuia 2 tailings dam. Electrical resistivity imaging (ERI) method was able to detect spatially anomalous zones inside the embankment dam. These anomalies are the results of internal erosion phenomena which may progressing inside the dam and is difficult to detect by conventional methods. Data aquired by geophysical survey together with their interpretations were used in the numerical model for slope stability assessment. The final results show us the structural weakness induced by the presence of internal erosion elements especially for seismic loading case. This research methodology may be also available for tailings dam monitoring purposes. Electrical Rezistivity Imaging (ERI) was performed on Cetatuia 2 dam at the Uranium Milling Plant Feldioara, in order to map areas with lateral and vertical changes in resistivity. The electrodes are connected to an automated computer operated switch box that selects the 4 electrodes to be used. A computer controls the switch box and the measuring device, and runs a program that selects the electrodes, makes the measurement, and stores the measurement. For inversion processing procedures was used Res2Din software. The measured resistivity were plotted by the pseudo section contouring method. There are five resistivity pseudosections obtained from the Cetatuia 2 tailings dam during the october 2007 measurements. Four transversal profiles trans1 to trans4 are perpendicular to the berms and the longitudinal one long1 is placed along dam's crest. The high resistivities near the berms surfaces corresponds to unsaturated fill materials

  7. Sustainability of dams-an evaluation approach

    Science.gov (United States)

    Petersson, E.

    2003-04-01

    Situated in the stream bed of a river, dams and reservoirs interrupt the natural hydrological cycle. They are very sensitive to all kinds of changes in the catchment, among others global impacts on land use, climate, settlement structures or living standards. Vice versa dams strongly affect the spatially distributed, complex system of ecology, economy and society in the catchment both up- and downstream of the reservoir. The occurrence of negative impacts due to large dams led to serious conflicts about future dams. Nevertheless, water shortages due to climatic conditions and their changes, that are faced by enormous water and energy demands due to rising living standards of a growing world population, seem to require further dam construction, even if both supply and demand management are optimised. Although environmental impact assessments are compulsory for dams financed by any of the international funding agencies, it has to be assumed that the projects lack sustainability. Starting from an inventory of today's environmental impact assessments as an integral part of a feasibility study the presentation will identify their inadequacies with regard to the sustainability of dams. To improve the sustainability of future dams and avoid the mistakes of the past, the planning procedures for dams have to be adapted. The highly complex and dynamical system of interrelated physical and non-physical processes, that involves many different groups of stakeholders, constitutes the need for a model-oriented decision support system. In line with the report of the World Commission of Dams an integrated analysis and structure of the complex interrelations between dams, ecology, economy and society will be presented. Thus the system, that a respective tool will be based on, is analysed. Furthermore an outlook will be given on the needs of the potential users of a DSS and how it has to be embedded in the overall planning process. The limits of computer-based decision-support in the

  8. Fuel performance improvement program. Quarterly/annual progress report, October 1977--September 1978

    International Nuclear Information System (INIS)

    Crouthamel, C.E.

    1978-10-01

    This quarterly/annual report reviews and summarizes the activities performed in support of the Fuel Performance Improvement Program (FPIP) during Fiscal Year 1978 with emphasis on those activities that transpired during the quarter ending September 30, 1978. Significant progress has been made in achieving the primary objectives of the program, i.e., to demonstrate commercially viable fuel concepts with improved fuel - cladding interaction (FCI) behavior. This includes out-of-reactor experiments to support the fuel concepts being evaluated, initiation of instrumented test rod experiments in the Halden Boiling Water Reactor (HBWR), and fabrication of the first series of demonstration rods for irradiation in the Big Rock Point Reactor

  9. 33 CFR 100.1102 - Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam...

    Science.gov (United States)

    2010-07-01

    ... River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). 100.1102 Section... MARINE PARADES SAFETY OF LIFE ON NAVIGABLE WATERS § 100.1102 Marine Events on the Colorado River, between Davis Dam (Bullhead City, Arizona) and Headgate Dam (Parker, Arizona). (a) General. Sponsors are...

  10. Brazil's Amazonian dams: Ecological and socioeconomic impacts

    Science.gov (United States)

    Fearnside, P. M.

    2016-12-01

    Brazil's 2015-2024 Energy Expansion Plan calls for 11 hydroelectric dams with installed capacity ≥ 30 MW in the country's Amazon region. Dozens of other large dams are planned beyond this time horizon, and dams with environmental and socioeconomic impacts. Loss of forest to flooding is one, the Balbina and Tucuruí Dams being examples (each 3000 km2). If the Babaquara/Altamira Dam is built it will flood as much forest as both of these combined. Some planned dams imply loss of forest in protected areas, for example on the Tapajós River. Aquatic and riparian ecosystems are lost, including unique biodiversity. Endemic fish species in rapids on the Xingu and Tapajós Rivers are examples. Fish migrations are blocked, such as the commercially important "giant catfish" of the Madeira River. Dams emit greenhouse gases, including CO2 from the trees killed and CH4 from decay under anoxic conditions at the bottom of reservoirs. Emissions can exceed those from fossil-fuel generation, particularly over the 20-year period during which global emissions must be greatly reduced to meet 1.5-2°C limit agreed in Paris. Carbon credit for dams under the Climate Convention causes further net emission because the dams are not truly "additional." Anoxic environments in stratified reservoirs cause methylation of mercury present in Amazonian soils, which concentrates in fish, posing a health risk to human consumers. Population displacement is a major impact; for example, the Marabá Dam would displace 40,000 people, mostly traditional riverside dwellers (ribeirinhos). Various dams impact indigenous peoples, such as the Xingu River dams (beginning with Belo Monte) and the São Luiz do Tapajós and Chacorão Dams on the Tapajós River. Brazil has many energy options other than dams. Much energy use has little benefit for the country, such as exporting aluminum. Electric showerheads use 5% of the country's power. Losses in transmission lines (20%) are far above global averages and can be

  11. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at

  12. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  13. GIS inundation mapping and dam breach analysis of Woolwich Dam using HEC-geoRAS

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada); Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-07-01

    A study was conducted to determine the extent of flood inundation given a hypothetical dam breach scenario of the Woolwich Dam located in the Grand River Watershed, 2.5 km north of the Town of Elmira, Ontario. The dam is operated by the Grand River Conservation Authority and was constructed to provide low-flow augmentation to Canagagigue Creek. Advances in the computational capabilities of numerical models along with the availability of fine resolution geospatial data has lead to significant advances in the evaluation of catastrophic consequences due to the ensuing flood waters when dams fail. The hydraulic models HEC-RAS and HEC-GeoRAS were used in this study along with GIS to produce high resolution spatial and temporal flood inundation mapping. Given the proximity to the Town of Elmira, the dam is classified as having a high hazard potential. The large size and high hazard potential of the dam suggests that the Inflow Design Flood (IDF) is the Probable Maximum Flood (PMF) event. The outlet structure of the spillway consists of 4 ogee-type concrete spillways equipped with radial gates. A low-level concrete pipe located within the spillway structure provides spillage for maintenance purposes. The full flow capacity of the spillway structure is 297 cubic metres per second at the full supply level of 364.8 metres. In addition to GIS flood inundation maps, this paper included the results of flood hydrographs, water surface profiles and peak flow data. It was concluded that techniques used in this analysis should be considered for use in the development of emergency management planning and dam safety assessments across Canada. 6 refs., 3 tabs., 4 figs.

  14. Research on shape optimization of CSG dams

    Directory of Open Access Journals (Sweden)

    Xin Cai

    2011-12-01

    Full Text Available The multi-objective optimization method was used for shape optimization of cement sand and gravel (CSG dams in this study. The economic efficiency, the sensitivities of maximum horizontal displacement and maximum settlement of the dam to water level changes, the overall stability, and the overall strength security were taken into account during the optimization process. Three weight coefficient selection schemes were adopted to conduct shape optimization of a dam, and the case studies lead to the conclusion that both the upstream and downstream dam slope ratios for the optimal cross-section equal 1:0.7, which is consistent with the empirically observed range of 1:0.6 to 1:0.8 for the upstream and downstream dam slope ratios of CSG dams. Therefore, the present study is of certain reference value for designing CSG dams.

  15. The World Commission on Dams + 10: Revisiting the Large Dam Controversy

    Directory of Open Access Journals (Sweden)

    Deborah Moore

    2010-06-01

    Full Text Available The World Commission on Dams (WCD was an experiment in multi-stakeholder dialogue and global governance concerned with a subject area – large dams – that was fraught with conflict and controversy. The WCD Report, Dams and Development: A New Framework for Decision-Making, was published in 2000 and accompanied by hopes that broad-based agreements would be forged on how to better manage water and energy development. Ten years later, this special issue of Water Alternatives revisits the WCD and its impacts, exploring the question: Is the WCD still relevant? The editorial team and the Guest Editors of this special issue of Water Alternatives have selected a range of 20 papers, 6 viewpoints, and 4 book reviews that help to illustrate the evolution in the dams debate. The goal of this special issue is to examine the influence and the impacts of the WCD on the dam enterprise, in general, and on the policies and practices of key stakeholders and institutions, and on the development outcomes for affected communities and environments, in particular. In this introduction, the Guest Editors provide an overview of the special issue, exploring the new drivers of dam development that have emerged during the last decade, including climate change and new financiers of dams, and describing the themes emerging from this diverse set of papers and viewpoints. This special issue demonstrates the need for a renewed multi-stakeholder dialogue at multiple levels. This would not be a redo of the WCD, but rather a rekindling and redesigning of processes and forums where mutual understanding, information-sharing, and norm-setting can occur. One of the most promising developments of the last decade is the further demonstration, in case studies described here, that true partnership amongst key stakeholders can produce transformative resource-sharing agreements, showing that many of the WCD recommendations around negotiated decision making are working in practice. We hope

  16. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  17. Long-term trend analysis on total and extreme precipitation over Shasta Dam watershed.

    Science.gov (United States)

    Toride, Kinya; Cawthorne, Dylan L; Ishida, Kei; Kavvas, M Levent; Anderson, Michael L

    2018-06-01

    California's interconnected water system is one of the most advanced water management systems in the world, and understanding of long-term trends in atmospheric and hydrologic behavior has increasingly being seen as vital to its future well-being. Knowledge of such trends is hampered by the lack of long-period observation data and the uncertainty surrounding future projections of atmospheric models. This study examines historical precipitation trends over the Shasta Dam watershed (SDW), which lies upstream of one of the most important components of California's water system, Shasta Dam, using a dynamical downscaling methodology that can produce atmospheric data at fine time-space scales. The Weather Research and Forecasting (WRF) model is employed to reconstruct 159years of long-term hourly precipitation data at 3km spatial resolution over SDW using the 20th Century Reanalysis Version 2c dataset. Trend analysis on this data indicates a significant increase in total precipitation as well as a growing intensity of extreme events such as 1, 6, 12, 24, 48, and 72-hour storms over the period of 1851 to 2010. The turning point of the increasing trend and no significant trend periods is found to be 1940 for annual precipitation and the period of 1950 to 1960 for extreme precipitation using the sequential Mann-Kendall test. Based on these analysis, we find the trends at the regional scale do not necessarily apply to the watershed-scale. The sharp increase in the variability of annual precipitation since 1970s is also detected, which implies an increase in the occurrence of extreme wet and dry conditions. These results inform long-term planning decisions regarding the future of Shasta Dam and California's water system. Copyright © 2018 Elsevier B.V. All rights reserved.

  18. Water temperature effects from simulated changes to dam operations and structures in the Middle and South Santiam Rivers, Oregon

    Science.gov (United States)

    Buccola, Norman L.

    2017-05-31

    Green Peter and Foster Dams on the Middle and South Santiam Rivers, Oregon, have altered the annual downstream water temperature profile (cycle). Operation of the dams has resulted in cooler summer releases and warmer autumn releases relative to pre-dam conditions, and that alteration can hinder recovery of various life stages of threatened spring-run Chinook salmon (Oncorhyncus tshawytscha) and winter steelhead (O. mykiss). Lake level management and the use of multiple outlets from varying depths at the dams can enable the maintenance of a temperature regime more closely resembling that in which the fish evolved by releasing warm surface water during summer and cooler, deeper water in the autumn. At Green Peter and Foster Dams, the outlet configuration is such that temperature control is often limited by hydropower production at the dams. Previously calibrated CE-QUAL-W2 water temperature models of Green Peter and Foster Lakes were used to simulate the downstream thermal effects from hypothetical structures and modified operations at the dams. Scenarios with no minimum power production requirements allowed some releases through shallower and deeper outlets (summer and autumn) to achieve better temperature control throughout the year and less year-to-year variability in autumn release temperatures. Scenarios including a hypothetical outlet floating 1 meter below the lake surface resulted in greater ability to release warm water during summer compared to existing structures. Later in Autumn (October 15–December 31), a limited amount of temperature control was realized downstream from Foster Dam by scenarios limited to operational changes with existing structures, resulting in 15-day averages within 1.0 degree Celsius of current operations.

  19. Simple estimating method of damages of concrete gravity dam based on linear dynamic analysis

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, T.; Kanenawa, K.; Yamaguchi, Y. [Public Works Research Institute, Tsukuba, Ibaraki (Japan). Hydraulic Engineering Research Group

    2004-07-01

    Due to the occurrence of large earthquakes like the Kobe Earthquake in 1995, there is a strong need to verify seismic resistance of dams against much larger earthquake motions than those considered in the present design standard in Japan. Problems exist in using nonlinear analysis to evaluate the safety of dams including: that the influence which the set material properties have on the results of nonlinear analysis is large, and that the results of nonlinear analysis differ greatly according to the damage estimation models or analysis programs. This paper reports the evaluation indices based on a linear dynamic analysis method and the characteristics of the progress of cracks in concrete gravity dams with different shapes using a nonlinear dynamic analysis method. The study concludes that if simple linear dynamic analysis is appropriately conducted to estimate tensile stress at potential locations of initiating cracks, the damage due to cracks would be predicted roughly. 4 refs., 1 tab., 13 figs.

  20. Smolt monitoring at the head of Lower Granite Reservoir and Lower Granite Dam, 1998.; ANNUAL

    International Nuclear Information System (INIS)

    2000-01-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka, during the 1998 spring outmigration at migrant traps on the Snake and Salmon rivers. All hatchery chinook salmon released above Lower Granite Dam 19 1998 were marked with a fin-clip. Total annual hatchery chinook salmon catch at the Snake River trap was 226% of the 1997 number and 110% of the 1996 catch. The wild chinook catch was 120% of the 1997 catch but was only 93% of 1996. Hatchery steelhead trout catch was 501% of 1997 numbers but only 90% of the 1996 numbers. Wild steelhead trout catch was 569% of 1997 and 125% of the 1996 numbers. The Snake River trap collected 106 age-0 chinook salmon. During 1998, for the first time, the Snake River trap captured a significant number of hatchery sockeye salmon (1,552) and hatchery coho salmon O. kisutch (166). Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations began on March 8 and were terminated for the season due to high flows on June 12. The trap was out of operation for 34 d during the season due to high flow and debris. Hatchery chinook salmon catch at the Salmon River trap was 476% and wild chinook salmon catch was 137% of 1997 numbers and 175% and 82% of 1996 catch, respectively. The hatchery steelhead trout collection in 1998 was 96% of the 1997 catch and 13% of the 1996 numbers. Wild steelhead trout collection in 1998 was 170% of the 1997 catch and 37% of the 1996 numbers. Travel time (d) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged chinook salmon and steelhead trout, marked at the head of the reservoir were affected by discharge. For fish tagged at the Snake River trap, statistical analysis of 1998 detected a significant relation between migration rate and discharge. For hatchery and

  1. Floristic composition of gold and uranium tailings dams, and adja­cent polluted areas, on South Africa’s deep-level mines

    Directory of Open Access Journals (Sweden)

    I. M. Weiersbye

    2006-08-01

    Full Text Available Gold and uranium tailings (‘slimes’ dams and the adjacent polluted soils in the deep-level mining regions of South Africa (Carletonville, Klerksdorp and Welkom were surveyed for the frequency of occurrence of naturally colonizing, actively introduced and persisting plant species. Fifty-six tailings dams with a combined area of 5864 ha. and a similar area o f tail- ings-polluted soils, were surveyed between July 1996 and March 1997. During the survey, 376 plant species and subspecies were recorded from the dams and adjacent polluted soils, with an additional  8 6  records obtained between 1998 and 2003 (i.e. a total of 462 taxa: species and infraspecific species. Overall, the most commonly represented families were the Poaceae (107 species and subspecies, Asteraceae (81. Fabaceae (55 and Anacardiaceae (16. with other families represented by just one to 14 species. Only 60 species were common to all three regions, and of these 24 had been introduced during rehabilitation attempts. Most of the species found on tailings were persisters or natural colonizers (53-88%, depending on substrate, with the vast majority being indigenous and perennial taxa (76% and 85% respectively, with semi-woody to woody growth forms (6 6% being resprouters, forbs, shrubs and trees. Less than 4% of the naturally-colonizing taxa found during the survey had also been introduced by vegetation practitioners. The majority of introduced plants were alien herbaceous taxa. The number and frequency of annuals was only high on recently vegetated sites, whereas annuals were rarely present on old-vegetated and never-vegetated dams. This list includes a wide range of indigenous plant species that may be suitable for phytoremediation of tailings dams and polluted soils due to their apparent tolerance of acid mine drainage and salinity.

  2. Annual Progress report - General Task

    International Nuclear Information System (INIS)

    Wesnousky, S.G.

    1993-01-01

    This report provides a summary of progress for the project open-quotes Evaluation of the Geologic Relations and Seismotectonic Stability of the Yucca Mountain Area, Nevada Nuclear Waste Site Investigation (NNWSI).close quotes A similar report was previously provided for the period of 1 October 1991 to 30 September 1992. The report initially covers the activities of the General Task and is followed by sections that describe the progress of the other ongoing tasks

  3. Tenaga Nasional Berhad dam safety and surveillance program

    International Nuclear Information System (INIS)

    Jansen Luis; Zulkhairi Abd Talib

    2006-01-01

    This paper discusses the current practice of dam surveillance, which includes dam monitoring which is a process of visual inspections, measuring, processing, compiling and analyzing dam instrumentation data to determine the performance of a dam. The prime objective of the dam surveillance system is to ensure that any occurrence and development of safety deficiencies and problems are quickly detected, identified, analyzed and the required remedial actions are determined and consequently carried out in due time. In brief, the section is responsible to ensure that the dam monitoring and surveillance works are implemented as per scheduled and in accordance with the requirement and guidelines prepared by the dam designers and in accordance with international commission on large dams, ICOLD. The paper also illustrates and recommends an alternative approach for dam surveillance program using risk management approach, which is currently being actively adopted by some countries like USA, Canada, Australia and etc, towards improving the dam safety management and the decision making process. The approach provides a wider area of opportunity, improvements and benefits particular in the evaluation and modifications to the dam performance and safety. The process provides an effective and efficient tool for the decision makers and engineers through a comprehensive evaluation and a good understanding of the hazards, risks and consequences in relation to dam safety investigations. (Author)

  4. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  5. Sinkhole remediation at Swinging Bridge Dam

    Energy Technology Data Exchange (ETDEWEB)

    Jones, A. [Devine Tarbell and Associates, Portland, ME (United States)

    2009-07-01

    This case history summary described a piping-related sinkhole that occurred after a flood at the Swinging Bridge Dam. The earth-filled embankment dam was constructed using a hydraulic fill technique. A foundation drilling and grouting program was constructed in areas of the dam founded on jointed sandstone and shale. The storage volumes of the reservoir is 32,000 acre-feet. A sinkhole 25 to 300 feet in diameter was observed on May 5, 2005 along the edge of the dam crest. The sinkhole extended to within 10 feet of the reservoir and was separated by a shallow berm of soil and driftwood. Cracking of the crest extended across an area of 180 feet. Operations staff notified the appropriate agencies, implemented a monitoring program, and mobilized construction equipment and sands for use as emergency sinkhole filler. An increase in tailrace turbidity was observed. Historical records for the dam showed significant cracking during the initial filling of the reservoir. Failure modes included increased pore pressures and seepages resulting in the piping of soil along the outside of the dam conduit. Emergency repairs included chemical grouting and weld repairs in the penstocks. A Federal Emergency Management Agency (FEMA) is currently addressing safety issues associated with conduits through dams. 4 refs., 11 figs.

  6. Dynamic tests at the Outardes 3 dam

    International Nuclear Information System (INIS)

    Proulx, J.; Paultre, P.; Duron, Z.; Tai Mai Phat; Im, O.

    1992-01-01

    At the Outardes 3 gravity dam, part of the Manicouagan-Outardes hydroelectric complex in northeastern Quebec, forced vibration tests were carried out using an eccentric mass shaker attached to the dam crest at three different locations. Accelerations were measured along the crest and in the inspection galleries, and hydrodynamic pressures were measured along the upstream dam face and at various locations in the reservoir. The tests were designed to analyze the effects of gravity dam-reservoir interactions and to generate a data base for calibrating finite element models used in studying the dynamic behavior of gravity dams. Experimental results are presented in order to demonstrate the quality of the data obtained and the effectiveness of the experimental procedures. Modes of vibration were observed which corresponded to those obtained by finite element analysis. It is shown that techniques recently developed for dynamic tests on large dams can be successfully used on gravity dams. 3 refs., 6 figs

  7. Kootenai River Fisheries Investigation : Stock Status of Burbot : Project Progress Report 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Paragamian, Valughn L.; Laude Dorothy C.

    2008-12-26

    Objectives of this investigation were to (1) monitor the population status and recruitment of burbot Lota lota in the Kootenai River, Idaho and British Columbia, Canada during the winter of 2006-2007; (2) evaluate the selective withdrawal system in place at Libby Dam to maintain the river temperature near Bonners Ferry between 1-4 C (November-December) to improve burbot migration and spawning activity; and (3) determine if a hatching success of 10% of eyed burbot embryos could be achieved through extensive rearing and produce fingerlings averaging 9.8 cm in six months. Water temperature did not fall below the upper limit (4 C) until mid-January but was usually maintained between 1-4 C January through February and was acceptable. Snowpack was characterized by a 101% of normal January runoff forecast. Adult burbot were sampled with hoop nets and slat traps. Only three burbot were captured in hoop nets, all at Ambush Rock (rkm 244.5). No burbot were caught in either slat traps or juvenile sampling gear, indicating the population is nearly extirpated. Burbot catch per unit effort in hoop nets was 0.003 fish/net d. Extensive rearing was moved to a smaller private pond and will be reported in the 2008-2009 annual report.

  8. Modeling the capacity of riverscapes to support beaver dams

    Science.gov (United States)

    Macfarlane, William W.; Wheaton, Joseph M.; Bouwes, Nicolaas; Jensen, Martha L.; Gilbert, Jordan T.; Hough-Snee, Nate; Shivik, John A.

    2017-01-01

    The construction of beaver dams facilitates a suite of hydrologic, hydraulic, geomorphic, and ecological feedbacks that increase stream complexity and channel-floodplain connectivity that benefit aquatic and terrestrial biota. Depending on where beaver build dams within a drainage network, they impact lateral and longitudinal connectivity by introducing roughness elements that fundamentally change the timing, delivery, and storage of water, sediment, nutrients, and organic matter. While the local effects of beaver dams on streams are well understood, broader coverage network models that predict where beaver dams can be built and highlight their impacts on connectivity across diverse drainage networks are lacking. Here we present a capacity model to assess the limits of riverscapes to support dam-building activities by beaver across physiographically diverse landscapes. We estimated dam capacity with freely and nationally-available inputs to evaluate seven lines of evidence: (1) reliable water source, (2) riparian vegetation conducive to foraging and dam building, (3) vegetation within 100 m of edge of stream to support expansion of dam complexes and maintain large colonies, (4) likelihood that channel-spanning dams could be built during low flows, (5) the likelihood that a beaver dam is likely to withstand typical floods, (6) a suitable stream gradient that is neither too low to limit dam density nor too high to preclude the building or persistence of dams, and (7) a suitable river that is not too large to restrict dam building or persistence. Fuzzy inference systems were used to combine these controlling factors in a framework that explicitly also accounts for model uncertainty. The model was run for 40,561 km of streams in Utah, USA, and portions of surrounding states, predicting an overall network capacity of 356,294 dams at an average capacity of 8.8 dams/km. We validated model performance using 2852 observed dams across 1947 km of streams. The model showed

  9. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  10. Seismic failure modes and seismic safety of Hardfill dam

    Directory of Open Access Journals (Sweden)

    Kun Xiong

    2013-04-01

    Full Text Available Based on microscopic damage theory and the finite element method, and using the Weibull distribution to characterize the random distribution of the mechanical properties of materials, the seismic response of a typical Hardfill dam was analyzed through numerical simulation during the earthquakes with intensities of 8 degrees and even greater. The seismic failure modes and failure mechanism of the dam were explored as well. Numerical results show that the Hardfill dam remains at a low stress level and undamaged or slightly damaged during an earthquake with an intensity of 8 degrees. During overload earthquakes, tensile cracks occur at the dam surfaces and extend to inside the dam body, and the upstream dam body experiences more serious damage than the downstream dam body. Therefore, under the seismic conditions, the failure pattern of the Hardfill dam is the tensile fracture of the upstream regions and the dam toe. Compared with traditional gravity dams, Hardfill dams have better seismic performance and greater seismic safety.

  11. Qu'Appelle River Dam, dam break analysis using advanced GIS tools for rapid modelling and inundation mapping

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, D. [Hatch Energy, Winnipeg, MB (Canada); Campbell, C. [Saskatchewan Watershed Authority, Moose Jaw, SK (Canada); Groeneveld, J. [Hatch Energy, Calgary, AB (Canada)

    2008-07-01

    The South Saskatchewan River Project (SSRP) comprises a multi-purpose reservoir that provides water for conservation and irrigation, flood control, power generation, recreation, and municipal and industrial water supply. In addition to the 64 m high Gardiner Dam, the 27 m high Qu'Appelle River Dam and the 22 km long Lake Diefenbaker Reservoir, the SSRP also includes ancillary works. The Qu'Appelle River valley extends for 458 km before connecting to the Assiniboine River. The valley is incised up to 90 m in depth and is a popular cottaging and recreational area with several major communities located in the flood plain. In the event of a breach of the Qu'Appelle Dam, the discharge will increase from a normal maximum discharge of under 60 m{sup 3} per second to over 50,000 m{sup 3} per second. The Saskatchewan Watershed Authority (SWA) is responsible for ensuring safe development of the Province's water resources, without affecting reservoir or lake operations, and preventing damage from flooding, erosion or land slides. It is in the process of developing Hazard Assessments and emergency preparedness plans for each of their dams in accordance with the Canadian Dam Safety Guidelines. Studies using GIS technology and the hydrodynamic routing model HEC-RAS have been completed to evaluate the potential inundation that may result in the event of failure of the Qu'Appelle River Dam. These studies involved the development of a breach parameter model using a breach data set revised to better reflect the Qu'Appelle River Dam; the development of a dam break model for the Qu'Appelle River Dam and downstream river and flood plain; and, the use of this model to simulate two potential dam failure scenarios for the Qu'Appelle River Dam, notably failure during passage of the PMF and failure during fair weather conditions. Inundation maps have been prepared for the downstream Qu'Appelle River valley for each of the above events. 3 refs., 4

  12. Hydrological modeling of the Simly Dam watershed (Pakistan using GIS and SWAT model

    Directory of Open Access Journals (Sweden)

    Shimaa M. Ghoraba

    2015-09-01

    Full Text Available Modern mathematical models have been developed for studying the complex hydrological processes of a watershed and their direct relation to weather, topography, geology and land use. In this study the hydrology of Simly Dam watershed located in Saon River basin at the north-east of Islamabad is modeled, using the Soil and Water Assessment Tool (SWAT. It aims to simulate the stream flow, establish the water balance and estimate the monthly volume inflow to Simly Dam in order to help the managers to plan and handle this important reservoir. The ArcSWAT interface implemented in the ArcGIS software was used to delineate the study area and its sub-components, combine the data layers and edit the model database. The model was calibrated from 1990 to 2001 and evaluated from 2002 to 2011. Based on four recommended statistical coefficients, the evaluation indicates a good performance for both calibration and validation periods and acceptable agreement between measured and simulated values of both annual and monthly scale discharge. The water balance components were correctly estimated and the Simly Dam inflow was successfully reproduced with Coefficient of Determination (R2 of 0.75. These results revealed that if properly calibrated, SWAT model can be used efficiently in semi-arid regions to support water management policies.

  13. Mineral cycling in soil and litter arthropod food chains. Annual progress report, February 1, 1983-January 31, 1984

    International Nuclear Information System (INIS)

    Crossley, D.A. Jr.

    1983-01-01

    This annual report describes progress in research on the influence of soil fauna on the general process of terrestrial decomposition. The major goal is to investigate the regulation of decomposition by soil arthropods. Methods have included radioactive tracer measurements of food chain dynamics, rates of nutrient or mineral element flow during decomposition, and simulation modeling. This year's report describes significant progress in defining the influence of soil arthropods in stimulating microbial immobilization of nutrients. Preliminary efforts to define the importance of the soil-litter macroarthropods are also reported

  14. The interplay of activists and dam developers : the case of Myanmar’s mega-dams

    NARCIS (Netherlands)

    Kirchherr, Julian|info:eu-repo/dai/nl/411261487; J. Charles, Katrina; Walton, Matthew J.

    2017-01-01

    Scholars investigating activism against large dam developments in Asia usually focus on those campaigning, but not on those the campaigns are aimed at–the dam developers. Yet the developers’ perspective is crucial to comprehensively understand the dynamics of social and environmental activism in

  15. Monitoring the ongoing deformation and seasonal behaviour affecting Mosul Dam through space-borne SAR data

    Science.gov (United States)

    Tessari, G.; Riccardi, P.; Pasquali, P.

    2017-12-01

    Monitoring of dam structural health is an important practice to control the structure itself and the water reservoir, to guarantee efficient operation and safety of surrounding areas. Ensuring the longevity of the structure requires the timely detection of any behaviour that could deteriorate the dam and potentially result in its shutdown or failure.The detection and monitoring of surface displacements is increasingly performed through the analysis of satellite Synthetic Aperture Radar (SAR) data, thanks to the non-invasiveness of their acquisition, the possibility to cover large areas in a short time and the new space missions equipped with high spatial resolution sensors. The availability of SAR satellite acquisitions from the early 1990s enables to reconstruct the historical evolution of dam behaviour, defining its key parameters, possibly from its construction to the present. Furthermore, the progress on SAR Interferometry (InSAR) techniques through the development of Differential InSAR (DInSAR) and Advanced stacking techniques (A-DInSAR) allows to obtain accurate velocity maps and displacement time-series.The importance of these techniques emerges when environmental or logistic conditions do not allow to monitor dams applying the traditional geodetic techniques. In such cases, A-DInSAR constitutes a reliable diagnostic tool of dam structural health to avoid any extraordinary failure that may lead to loss of lives.In this contest, an emblematic case will be analysed as test case: the Mosul Dam, the largest Iraqi dam, where monitoring and maintaining are impeded for political controversy, causing possible risks for the population security. In fact, it is considered one of the most dangerous dams in the world because of the erosion of the gypsum rock at the basement and the difficult interventions due to security problems. The dam consists of 113 m tall and 3.4 km long earth-fill embankment-type, with a clay core, and it was completed in 1984.The deformation

  16. Circuitous to single thread: post-dam geomorphic transformation of the Colorado River in its delta

    Science.gov (United States)

    Mueller, E. R.; Schmidt, J. C.

    2017-12-01

    The Colorado River in its delta has transformed from a maze of secondary and distributary channels to an intermittent or ephemeral stream largely disconnected from formerly active channels and floodplains. Periodic post-dam floods have demonstrated that channel migration and shifting during floods increased the extent and diversity of riparian vegetation, and suggested that restoration of fluvial processes that promote re-activation of these former channels may enhance ecosystem rehabilitation. But restoration efforts in the delta are complicated by the fact that the Colorado River has the largest reservoir size in relation to its mean annual flow of any large river in North America and most of its sediment supply is completely blocked in upstream reservoirs. As a result, small controlled floods intended to inundate formerly active channels and rejuvenate riparian vegetation must consider the new relationship between stream flow and the delta's transformed geomorphology. Post-dam channel change has been dominated by the abandonment of secondary and distributary channels, with 3 to 4 meters of bed incision in the upstream part of the delta that diminishes downstream. Initial bed incision of 2 to 3 meters occurred rapidly following completion of Hoover Dam in 1936, before further upstream water development reduced delta flows to near zero by the mid-1960s. The largest post-dam floods occurred in the 1980s, which resulted in 10s to 100s of meters of lateral migration, channel switching, and the reactivation of secondary channels and floodplains rarely inundated since dam completion. Smaller flow pulses in the 1990s and 2000s further incised the thalweg to its minimum elevation, resulting in a narrow single-thread channel inset within the multi-channel surface active during the 1980s. In 2014, an experimental pulse flow was released to the river channel with a peak discharge approximately 5% of the typical pre-dam flood peak. Topographic change was confined to the main

  17. Factors influencing hysteresis characteristics of concrete dam deformation

    Directory of Open Access Journals (Sweden)

    Jia-he Zhang

    2017-04-01

    Full Text Available Thermal deformation of a concrete dam changes periodically, and its variation lags behind the air temperature variation. The lag, known as the hysteresis time, is generally attributed to the low velocity of heat conduction in concrete, but this explanation is not entirely sufficient. In this paper, analytical solutions of displacement hysteresis time for a cantilever beam and an arch ring are derived. The influence of different factors on the displacement hysteresis time was examined. A finite element model was used to verify the reliability of the theoretical analytical solutions. The following conclusions are reached: (1 the hysteresis time of the mean temperature is longer than that of the linearly distributed temperature difference; (2 the dam type has a large impact on the displacement hysteresis time, and the hysteresis time of the horizontal displacement of an arch dam is longer than that of a gravity dam; (3 the reservoir water temperature variation lags behind of the air temperature variation, which intensifies the differences in the horizontal displacement hysteresis time between the gravity dam and the arch dam; (4 with a decrease in elevation, the horizontal displacement hysteresis time of a gravity dam tends to increase, whereas the horizontal displacement hysteresis time of an arch dam is likely to increase initially, and then decrease; and (5 along the width of the dam, the horizontal displacement hysteresis time of a gravity dam decreases as a whole, while the horizontal displacement hysteresis time of an arch dam is shorter near the center and longer near dam surfaces.

  18. Survival Estimates for the Passage of Juvenile Chinook Salmon through Snake River Dams and Reservoirs, 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Iwamoto, Robert N.; Sandford, Benjamin P.; McIntyre, Kenneth W.

    1994-04-01

    A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at different areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers.

  19. Survival estimates for the passage of juvenile chinook salmon through Snake River dams and reservoirs. Annual report 1993

    International Nuclear Information System (INIS)

    Iwamoto, R.N.; Muir, W.D.; Sandford, B.P.; McIntyre, K.W.; Frost, D.A.; Williams, J.G.; Smith, S.G.; Skalski, J.R.

    1994-04-01

    A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at different areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers

  20. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  1. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  2. Measuring and managing safety at Wahleach Dam

    International Nuclear Information System (INIS)

    Salmon, G. M.; Cattanach, J. D.; Hartford, D. N. D.

    1996-01-01

    Safety improvements recently implemented at the Wahleach Dam were described as one of the first instances in international dam safety practice where risk concepts have been used in conjunction with acceptable risk criteria to evaluate safety of a dam relative to required level of safety. Erosion was identified as the greatest threat to the safety of the dam. In addressing the deficiencies B.C. Hydro formulated a process which advocates a balanced level of safety,i.e. the probability of failure multiplied by the consequences of failure, integrated over a range of initiators. If the risk posed by the dam is lower than a 'tolerable' risk, the dam is considered to be safe enough. In the case of the Wahleach Dam, the inflow design flood (IDF) was selected to be about one half of the probable maximum flow (PMF), hence it was more likely than not that the spillway could pass floods up to and including the PMF. By accepting the determined level of risk, expenditures of several million dollars for design and construction of dam safety improvements were made redundant. Another byproduct of this new concept of risk assessment was the establishment of improved life safety protection by means of an early warning system for severe floods through the downstream community and emergency authorities. 3 refs., 5 tabs

  3. Sediment and 137Cs transport and accumulation in the Ogaki Dam of eastern Fukushima

    International Nuclear Information System (INIS)

    Yamada, Susumu; Malins, Alex; Machida, Masahiko; Kitamura, Akihiro; Kurikami, Hiroshi; Yamaguchi, Masaaki

    2015-01-01

    The Ogaki Dam Reservoir is one of the principal irrigation dam reservoirs in the Fukushima Prefecture and its upstream river basin was heavily contaminated by radioactivity from the Fukushima Daiichi Nuclear Power Plant accident. For the purpose of environmental assessment, it is important to determine the present condition of the water in the reservoir and to understand the behavior of sediment-sorbed radioactive cesium under different modes of operation of the dam, as these factors affect further contamination of arable farmlands downstream of the reservoir through sediment migration. This paper addresses this issue with numerical simulations of fluvial processes in the reservoir using the two-dimensional Nays2D code. We distinguish three grades of sediment (clay, silt, and sand), as cesium adherence depends on sediment grain size and surface area. Boundary conditions for the simulations were informed by monitoring data of the upstream catchment and by the results from a separate watershed simulation for sediment transport into the reservoir. The performance of the simulation method was checked by comparing the results for a typhoon flood in September 2013 against field monitoring data. We present results for sediment deposition on the reservoir bed and the discharge via the dam under typical yearly flood conditions, for which the bulk of annual sediment migration from the reservoir occurs. The simulations show that almost all the sand and silt that enter into the reservoir deposit onto the reservoir bed. However, the locations where they tend to deposit differ, with sand tending to deposit close to the entrance of the reservoir, whereas silt deposits throughout the reservoir. Both sand and silt settle within a few hours of entering the reservoir. In contrast, clay remains suspended in the reservoir water for a period as long as several days, thus increasing the amount that is discharged downstream from the reservoir. Under the current operating mode of the dam

  4. Large dams and alluvial rivers in the Anthropocene: The impacts of the Garrison and Oahe Dams on the Upper Missouri River

    Science.gov (United States)

    Skalak, Katherine; Benthem, Adam J.; Schenk, Edward R.; Hupp, Cliff R.; Galloway, Joel M.; Nustad, Rochelle A.; Wiche, Gregg J.

    2013-01-01

    The Missouri River has had a long history of anthropogenic modification with considerable impacts on river and riparian ecology, form, and function. During the 20th century, several large dam-building efforts in the basin served the needs for irrigation, flood control, navigation, and the generation of hydroelectric power. The managed flow provided a range of uses, including recreation, fisheries, and habitat. Fifteen dams impound the main stem of the river, with hundreds more on tributaries. Though the effects of dams and reservoirs are well-documented, their impacts have been studied individually, with relatively little attention paid to their interaction along a river corridor. We examine the morphological and sedimentological changes in the Upper Missouri River between the Garrison Dam in ND (operational in 1953) and Oahe Dam in SD (operational in 1959). Through historical aerial photography, stream gage data, and cross sectional surveys, we demonstrate that the influence of the upstream dam is still a major control of river dynamics when the backwater effects of the downstream reservoir begin. In the “Anthropocene”, dams are ubiquitous on large rivers and often occur in series, similar to the Garrison Dam Segment. We propose a conceptual model of how interacting dams might affect river geomorphology, resulting in distinct and recognizable morphologic sequences that we term “Inter-Dam sequence” characteristic of major rivers in the US.

  5. Stability of earth dam with a vertical core

    Directory of Open Access Journals (Sweden)

    Orekhov Vyacheslav Valentinovich

    2016-01-01

    Full Text Available Earth dam with impervious element in the form of asphaltic concrete core is currently the most promising type of earth dams (due to simple construction technology and universal service properties of asphaltic concrete and is widely used in the world. However, experience in the construction and operation of high dams (above 160 m is not available, and their work is scarcely explored. In this regard, the paper discusses the results of computational prediction of the stress-strain state and stability of a high earth dam (256 m high with the core. The authors considered asphaltic concrete containing 7 % of bitumen as the material of the core. Gravel was considered as the material of resistant prisms. Design characteristics of the rolled asphaltic concrete and gravel were obtained from the processing of the results of triaxial tests. The calculations were performed using finite element method in elastoplastic formulation and basing on the phased construction of the dam and reservoir filling. The research shows, that the work of embankment dam with vertical core during filling of the reservoir is characterized by horizontal displacement of the lower resistant prism in the tailrace and the formation of a hard wedge prism descending along the core in the upper resistant prism. The key issue of the safety assessment is to determine the safety factor of the overall stability of the dam, for calculation of which the destruction of the earth dam is necessary, which can be done by reducing the strength properties of the dam materials. As a results of the calculations, the destruction of the dam occurs with a decrease in the strength characteristics of the materials of the dam by 2.5 times. The dam stability depends on the stability of the lower resistant prism. The destruction of its slope occurs on the classical circular-cylindrical surface. The presence of a potential collapse surface in the upper resistant prism (on the edges of the descending wedge does

  6. The changing hydrology of a dammed Amazon

    Science.gov (United States)

    Timpe, Kelsie; Kaplan, David

    2017-01-01

    Developing countries around the world are expanding hydropower to meet growing energy demand. In the Brazilian Amazon, >200 dams are planned over the next 30 years, and questions about the impacts of current and future hydropower in this globally important watershed remain unanswered. In this context, we applied a hydrologic indicator method to quantify how existing Amazon dams have altered the natural flow regime and to identify predictors of alteration. The type and magnitude of hydrologic alteration varied widely by dam, but the largest changes were to critical characteristics of the flood pulse. Impacts were largest for low-elevation, large-reservoir dams; however, small dams had enormous impacts relative to electricity production. Finally, the “cumulative” effect of multiple dams was significant but only for some aspects of the flow regime. This analysis is a first step toward the development of environmental flows plans and policies relevant to the Amazon and other megadiverse river basins. PMID:29109972

  7. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  8. Fast changes in seasonal forest communities due to soil moisture increase after damming

    Directory of Open Access Journals (Sweden)

    Vagner Santiago do Vale

    2013-12-01

    Full Text Available Local changes caused by dams can have drastic consequences for ecosystems, not only because they change the water regime but also the modification on lakeshore areas. Thus, this work aimed to determine the changes in soil moisture after damming, to understand the consequences of this modification on the arboreal community of dry forests, some of the most endangered systems on the planet. We studied these changes in soil moisture and the arboreal community in three dry forests in the Araguari River Basin, after two dams construction in 2005 and 2006, and the potential effects on these forests. For this, plots of 20m x10m were distributed close to the impoundment margin and perpendicular to the dam margin in two deciduous dry forests and one semi-deciduous dry forest located in Southeastern Brazil, totaling 3.6ha sampled. Besides, soil analysis were undertaken before and after impoundment at three different depths 0-10, 20-30 and 40-50cm. A tree minimum DBH of 4.77cm community inventory was made before T0 and at two T2 and four T4 years after damming. Annual dynamic rates of all communities were calculated, and statistical tests were used to determine changes in soil moisture and tree communities. The analyses confirmed soil moisture increases in all forests, especially during the dry season and at sites closer to the reservoir; besides, an increase in basal area due to the fast growth of many trees was observed. The highest turnover occurred in the first two years after impoundment, mainly due to the higher tree mortality especially of those closer to the dam margin. All forests showed reductions in dynamic rates for subsequent years T2-T4, indicating that these forests tended to stabilize after a strong initial impact. The modifications were more extensive in the deciduous forests, probably because the dry period resulted more rigorous in these forests when compared to semideciduous forest. The new shorelines created by damming increased soil

  9. Numerical modelling for stability of tailings dams

    OpenAIRE

    Auchar, Muhammad; Mattsson, Hans; Knutsson, Sven

    2013-01-01

    A tailings dam is a large embankment structure that is constructed to store the waste from the mining industry. Stability problems may occur in a tailings dam due to factors such as quick rate of raising, internal erosion and liquefaction. The failure of a tailings dam may cause loss of human life and environmental degradation. Tailings Dams must not only be stable during the time the tailings storage facility is in operation, but also long time after the mine is closed. In Sweden, the licens...

  10. Environmental Sciences Division annual progress report for period ending September 30, 1982. Environmental Sciences Division Publication No. 2090

    International Nuclear Information System (INIS)

    1983-04-01

    Separate abstracts were prepared for 12 of the 14 sections of the Environmental Sciences Division annual progress report. The other 2 sections deal with educational activities. The programs discussed deal with advanced fuel energy, toxic substances, environmental impacts of various energy technologies, biomass, low-level radioactive waste management, the global carbon cycle, and aquatic and terrestrial ecology

  11. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  12. Environmental impacts of small dams on agriculture and ground water development: a case study of Khan pur Dam, Pakistan

    International Nuclear Information System (INIS)

    Ejaz, N.; Shahmim, M.A.; Elahi, A.; Khan, N.M.

    2012-01-01

    The water scarcity issues are increasing through out the world. Pakistan is also facing water crises and its water demands are increasing every day. During this research it is investigated that small dams are playing an important role for the sustainability of groundwater and agriculture. The main objective of this study was to assess the environmental impacts of small dam on agricultural and ground water. Proper planning and management of small dams may improve the sustainable agriculture in Pakistan. It is also concluded that small dams are significantly contributing towards economy, environment, local climate, recreational activities and crop production. Small dams can also be utilized for the production of electricity at local level. On the other hand, water management issues can be resolved by the involvement of local farmer's associations. Water losses through seepage, unlined channels and old irrigation methods are most critical in developing world. Considering the overall positive environmental impacts, construction of small dams must be promoted. (author)

  13. Assessing survival of Mid-Columbia River released juvenile salmonids at McNary Dam, Washington, 2008-09

    Science.gov (United States)

    Evans, Scott D.; Walker, Christopher E.; Brewer, Scott J.; Adams, Noah S.

    2010-01-01

    Few studies have evaluated survival of juvenile salmon over long river reaches in the Columbia River and information regarding the survival of sockeye salmon at lower Columbia River dams is lacking. To address these information gaps, the U.S. Geological Survey was contracted by the U.S. Army Corps of Engineers to evaluate the possibility of using tagged fish released in the Mid-Columbia River to assess passage and survival at and downstream of McNary Dam. Using the acoustic telemetry systems already in place for a passage and survival study at McNary Dam, fish released from the tailraces of Wells, Rocky Reach, Rock Island, Wanapum, and Priest Rapids Dams were detected at McNary Dam and at the subsequent downstream arrays. These data were used to generate route-specific survival probabilities using single-release models from fish released in the Mid-Columbia River. We document trends in passage and survival probabilities at McNary Dam for yearling Chinook and sockeye salmon and juvenile steelhead released during studies in the Mid-Columbia River. Trends in the survival and passage of these juvenile salmonid species are presented and discussed. However, comparisons made across years and between study groups are not possible because of differences in the source of the test fish, the type of acoustic tags used, the absence of the use of passive integrated transponder tags in some of the release groups, differences in tagging and release protocols, annual differences in dam operations and configurations, differences in how the survival models were constructed (that is, number of routes that could be estimated given the number of fish detected), and the number and length of reaches included in the analysis (downstream reach length and arrays). Despite these differences, the data we present offer a unique opportunity to examine the migration behavior and survival of a group of fish that otherwise would not be studied. This is particularly true for sockeye salmon because

  14. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  15. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No... Schedule SRD-08, Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative... ADMINISTRATION RATE SCHEDULE SRD-13 \\1\\ WHOLESALE RATES FOR HYDRO POWER AND ENERGY SOLD TO SAM RAYBURN DAM...

  16. Evaluatie Dam tot Damloop 2014

    NARCIS (Netherlands)

    Deutekom-Baart de la Faille, Marije

    In het weekend van 20 en 21 september 2014 vond de 30ste editie van de Dam tot Damloop plaats. Onderzoekers van de Hogeschool van Amsterdam en Hogeschool Inholland hebben bij de Dam tot Damloop een evaluatieonderzoek uitgevoerd met als doel het vinden van aanknopingspunten voor het structureel

  17. Annual report on reactor safety research projects sponsored by the Ministry of Economics and Labour of the Federal Republic of Germany. Reporting period 2003. Progress report

    International Nuclear Information System (INIS)

    2003-01-01

    The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of the investigations into the safety of nuclear power plants by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to general topics related to reactor safety research. Further, use is made of the classification system ''Joint Safety Research Index'' of the CEC (commission of the european communities). The reports are arranged in sequence of their project numbers

  18. Annual report on reactor safety research projects sponsored by the Ministry for Research and Technology of the Federal Republic of Germany. Reporting period 1993. Progress report

    International Nuclear Information System (INIS)

    1994-10-01

    The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMFT, informs continuously of the status of such investigations by means of semi-annual and annual publication of progress reports within the series GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about objectives, the work performed, the results, the next steps of the work etc. The individual reports are prepared in a standard form by the contractors themselves as a documentation of their progress in work and published by the Forschungsbetreuung at the GRS, (FB) (Research Coordination Department), within the framework of general information of progress in reactor safety research. The individual reports are classified according to the same classification system as applied in the nuclear index of the CEC (Commission of the European Communities) and the OECD (Organization for Economic Cooperation and Development). The reports are arranged in sequence of their project numbers. (orig./HP)

  19. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  20. Analysis the dynamic response of earth dam in free vibration and forced by introducing the effect of the interaction dam foundation

    Directory of Open Access Journals (Sweden)

    Malika Boumaiza

    2018-01-01

    Full Text Available The present study concerns the analysis of the dynamic response of earth dam, in free and forced vibration (under the effect of earthquake using the finite element method. The analysis is carried out at the end of dam construction without filling. The behavior of the dam materials and the foundation is linear elastic. In free vibration, to better understand the effect of the dam foundation interaction, we will take into account different site conditions and see their influence on the free vibration characteristics of the dam. In forced vibration, to study the seismic response of the dam, the system is subjected to the acceleration of the Boumerdes earthquake of May 21, 2003 recorded at the station n ° 2 of the dam of Kaddara in the base, with a parametric study taking into account the influence of the main parameters such as the mechanical properties of the soil: rigidity, density.

  1. Ice interactions at a dam face

    Energy Technology Data Exchange (ETDEWEB)

    Morse, B.; Morse, J.; Beaulieu, P.; Pratt, Y. [Laval Univ., Quebec City, PQ (Canada). Dept. of Civil Engineering; Stander, E. [State Univ. of New York, Cobleskill College, Cobleskill, NY (United States). Dept. of Natural Sciences; Cote, A.; Tarras, A.; Noel, P. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2009-07-01

    This paper reported on a joint research project between Laval University and Hydro-Quebec to study ice forces on dams in an effort to harmonize design criteria and develop mitigation strategies. This paper introduced the project and explored some of the preliminary results of the 2007-2008 field season. Ice displacement, ice stresses and ice forces on the LaGabelle dam were measured at several locations. The paper identified and discussed the complex relationships between data sets and discussed the spatial-temporal variability of the ice forces and its impact on design criteria. The project objective was to develop design criteria for ice forces on dams and to provide a scientific basis for interpreting and harmonizing existing recommended criteria. The methodology and site description were presented. It was concluded that the ice processes in a reservoir near a dam face subject to water fluctuations are quite complex. Therefore, in order to know the real average pressure on the dam, a significant amount of panels are required, having important implications for determining safe design values. 9 refs., 10 figs.

  2. The Political Ecology of Chinese Large Dams in Cambodia: Implications, Challenges and Lessons Learnt from the Kamchay Dam

    Directory of Open Access Journals (Sweden)

    Giuseppina Siciliano

    2016-09-01

    Full Text Available Given the opportunities offered by foreign investment in energy infrastructure mostly by Chinese firms, the Government of Cambodia is giving high priority to developing hydropower resources for reducing energy poverty and powering economic growth. Using a “Political ecology of the Asian drivers” framework, this paper assesses China’s involvement in the development of large dams’ in Cambodia and its impacts on the access of natural resources such as water and energy by dam builders, local communities and the government. This analysis is based on 61 interviews and 10 focus group discussions with affected communities, institutional actors, Chinese dam builders and financiers in relation to the first large Chinese dam built in Cambodia: the Kamchay dam. Based on the results of the analysis this paper makes recommendations on how to improve the planning, implementation and governance of future large dams in Cambodia.

  3. Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Everett, Scott R.; Tuell, Michael A. (Nez Perce Tribe, Department of Fishereis Resource Management, Lapwai, ID)

    2003-03-01

    The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2000 annual report covers the fourth year of sampling of this multi-year study. In 2000 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 53,277 hours of setline effort and 630 hours of hook-and-line effort was employed in 2000. A total of 538 white sturgeon were captured and tagged in the Snake River and 25 in the Salmon River. Since 1997, 32.8 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 48 cm to 271 cm and averaged 107 cm. In the Salmon River, white sturgeon ranged in total length from 103 cm to 227 cm and averaged 163 cm. Using the Jolly-Seber open population estimator, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,725 fish, with a 95% confidence interval of 1,668-5,783. A total of 10 white sturgeon were fitted with radio-tags. The movement of these fish ranged from 54.7 km (34 miles) downstream to 78.8 km (49 miles) upstream; however, 43.6 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of

  4. Improvement of the mechanical performance of Fergoug dam sediments treated for reuse in road engineering

    Directory of Open Access Journals (Sweden)

    Abdelkader LAROUCI

    2018-01-01

    Full Text Available The phenomenon of siltation is one of the main problems facing many dams throughout the world, and particularly in Algeria. The mud, before and even after extraction, is always harmful. Indeed, mud is a harmful material, first for dams, because it reduces their capacity of water storage, and second, for the environment following the desilting operations that generate large quantities of materials that occupy and sometimes pollute large areas. However, these materials can be exploited differently and used in other fields. The envisaged research work relates to real cases of silted dams, such as the dam of Fergoug (western Algeria whose siltation rate is very high; it is estimated at 97% of its initial capacity which, according to the National Agency for Dams (Agence Nationale des Barrages - ANB, is equal to 18 million m3. The large quantities of silt extracted present an environmental problem, and its use as a local raw material for the manufacture of civil engineering materials can contribute to solve this problem. The vulnerable lands of the sub-catchment of Wadi Fergoug (Fergoug River extend over an area of 122 km2, from a total surface of 8340 km2 for the dam catchment area. There is a great diversity of superficial formations with predominantly clay soils from marly formations. The rate of specific erosion has increased to 160 T/ km2/ year due to irregular annual rainfall resulting from a succession of dry and wet years. Sedimentary materials, which are found in considerable quantities, were collected at the foot of the dam, on its right bank. This study attempts to find a recycling pathway for these sediments. The objective of the present work is to investigate the behavior of silt from the dam of Fergoug (Algeria for the purpose of using it in road construction (foundation and base layers. The method adopted is to reconstitute, in the laboratory, samples of mixtures containing road aggregates with different proportions of silt. These

  5. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  6. Expectations of immortality: dam safety management into the next millennium

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, M.D. [Tonkin and Taylor International Ltd., Auckland, (New Zealand)

    1999-07-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs.

  7. Expectations of immortality: dam safety management into the next millennium

    International Nuclear Information System (INIS)

    Palmer, M.D.

    1999-01-01

    Topics concerning the problems associated with older and aging dams are considered including: what can be done to extent the lifetime of an old dam, the decision to decommission a dam based on a value judgment that the risk of maintaining the dam is too great for society's acceptance, the possibility of change in the level of risk tolerance with time in a technological environment, traditional surveillance methods used by dam owners in the Y2K situation, and the unreality of dam immortality. Trends and means for preserving older dams for their owner's purposes are outlined, as well as their lifetime compared to that of the downstream systems they serve. Despite the fact that we live in a throwaway society, dam owners cannot just leave their dam asset when they are through with using it. Someone has to maintain the dam, or ensure that it is safely decommissioned when the owner is finished with it. On a worldwide scale the available pool of experienced dam engineers is shrinking. This problem needs to be addressed by a shift towards operating and dam safety management skills based on a firm awareness of dam design principles. A shift in society's expectations has occurred such that dam designers and owners must now recognize the impact a dam can have both on its natural and social environments. Because of the increasing emphasis on paying attention to the impacts of people's activities on the planet, engineers more than anyone else must have a significant influence in that direction. 9 refs

  8. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

  9. Langbjorn dam : adaptation for safe discharge of extreme floods

    Energy Technology Data Exchange (ETDEWEB)

    Yang, J. [Vattenfall Research and Development, Alvkarleby (Sweden); Ericsson, H.; Gustafsson, A. [SWECO, Stockholm (Sweden); Stenmark, M. [Vattenfall Power Consultant, Ludvika (Sweden); Mikaelsson, J. [Vattenfall Nordic Generation, Bispgarden (Sweden)

    2007-07-01

    The Langbjorn hydropower scheme, composed of an embankment dam with an impervious core of compacted moraine, a spillway section and a powerhouse, is located on the Angermanalven River in north Sweden. The scheme was commissioned in 1959 and is owned by Vattenfall. As part of its dam safety program, Vattenfall plans to adapt and refurbish many of its dams to the updated design-flood and dam-safety guidelines. Langbjorn is classified as a high hazard dam, as its updated design flood is 30 per cent higher than the existing spillway capacity. Safety evaluations were conducted for the Langbjorn dam, and, as required by the higher safety standard, there was a need to rebuild the dam, so that the design flood could be safely released without causing failure of the dam. This paper provided information on the Langbjorn hydropower scheme and discussed the planned rebuilding measures. For example, the design flood was accommodated by allowing a temporary raise of the water level by 1.3 metres above the legal retention reservoir level, which required heightening and reinforcement of the dam. Specifically, the paper discussed measures to increase the discharge capacity; handling and control of floating debris; improvement and heightening of impervious core in left and right connecting dam and abutment; measures to increase the stability of the left steep riverbank; and measures to increase stability of the spillway monoliths and the left guide wall. In addition, the paper discussed measures to ensure stability of the downstream stretch of the river bank and increase instrumentation. The paper also presented the results of hydraulic investigations to investigate the risk of erosion downstream of the dam. It was concluded that the dam could discharge the design flood and that the stability of the dam was improved and judged to be satisfactory during all foreseeable conditions. 2 refs., 8 figs.

  10. The mathematics of dam safety

    Energy Technology Data Exchange (ETDEWEB)

    Widmann, R. [Osterreichische Gesellschaft fuer Geomechanik, Salzburg (Austria)

    1997-05-01

    The safety of a dam is determined by its design, construction and supervision during operation. High arch dam failures have dropped dramatically since the early part of this century. An essential part of the success story relates to improved measurement techniques that can detect earlier unexpected behaviour that may lead to failure. (UK)

  11. Automatic dam concrete placing system; Dam concrete dasetsu sagyo no jidoka system

    Energy Technology Data Exchange (ETDEWEB)

    Yoneda, Y; Hori, Y; Nakayama, T; Yoshihara, K; Hironaka, T [Okumura Corp., Osaka (Japan)

    1994-11-15

    An automatic concrete placing system was developed for concrete dam construction. This system consists of the following five subsystems: a wireless data transmission system, an automatic dam concrete mixing system, a consistency determination system, an automatic dam concrete loading and transporting system, and a remote concrete bucket opening and closing system. The system includes the following features: mixing amount by mixing ratio and mixing intervals can be instructed from a concrete placing site by using a wireless handy terminal; concrete is mixed automatically in a batcher plant; a transfer car is started, and concrete is charged into a bucket automatically; the mixed concrete is determined of its properties automatically; labor cost can be reduced, the work efficiency improved, and the safety enhanced; and the system introduction has resulted in unattended operation from the aggregate draw-out to a bunker line, manpower saving of five persons, and reduction in cycle time by 10%. 11 figs., 2 tabs.

  12. Dam safety investigations of the concrete structures of Hugh Keenleyside dam

    International Nuclear Information System (INIS)

    Hanna, A.W.; Nunn, J.O.H.; Cornish, L.; Northcott, P.

    1993-01-01

    The Hugh Keenleyside dam is located on the Columbia River in southeastern British Columbia, and impounds Arrow Lakes Reservoir which has a live storage of 8.8 km 3 and drains an area of 36,000 km 2 . It consists of a number of concrete structures, with a total length of 360 m and a maximum height of 58 m, and an earthfill embankment which spans across the original river channel. The 450 m long zoned earthfill dam is founded on pervious alluvium over 150 m deep. It has a sloping impervious core constructed from glacial till which extends 670 m upstream of the dam. This impervious blanket extends over the full width of the reservoir and is connected to the upstream face of the concrete structures. The results of a dam safety study, which was carried out due to the presence of high uplift pressures at some parts of the foundation, and stability concerns, are presented. The investigation concluded that the high uplift pressures were due to a localized defect in the upstream blanket and did not indicate any general deterioration of the blanket. Techniques that were found to be of particular use in the study for defining the source and nature of the foundation defects were: temperature surveys of flows from piezometers, cells and drains; air injection tests; and pressure response testing of cells, piezometers and drains to establish foundation interconnections. The concrete structures met the stability criteria for all load cases considered except for the navigation lock and the low level outlets. 3 refs., 6 figs

  13. Computational Aspects of Dam Risk Analysis: Findings and Challenges

    Directory of Open Access Journals (Sweden)

    Ignacio Escuder-Bueno

    2016-09-01

    Full Text Available In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management. This paper summarizes the outcomes of three themes related to dam risk analysis discussed in the Benchmark Workshops organized by the International Commission on Large Dams Technical Committee on “Computational Aspects of Analysis and Design of Dams.” In the 2011 Benchmark Workshop, estimation of the probability of failure of a gravity dam for the sliding failure mode was discussed. Next, in 2013, the discussion focused on the computational challenges of the estimation of consequences in dam risk analysis. Finally, in 2015, the probability of sliding and overtopping in an embankment was analyzed. These Benchmark Workshops have allowed a complete review of numerical aspects for dam risk analysis, showing that risk analysis methods are a very useful tool to analyze the risk of dam systems, including downstream consequence assessments and the uncertainty of structural models.

  14. On the response of large dams to incoherent seismic excitation

    International Nuclear Information System (INIS)

    Ramadan, O.; Novak, M.

    1993-01-01

    An intensive parametric study was conducted to investigate the response of concrete gravity dams to horizontal, spatially variable seismic ground motions. Both segmented dams consisting of separate blocks, or monoliths, and continuous monolithic dams are considered. The study includes the effects of various parameters on system natural frequencies, vibration modes, modal displacement ratios, as well as dam displacements and internal stresses due to spatially variable ground motions. The dam analytical model, and dam response to incoherent ground motions are described. The results show that the dam vibrates almost as a rigid body under the fully correlated waves, but bends and twists significantly under the spatially correlated motions. Dam-foundation interaction magnifies the low frequency components of the dam response, more so for a full reservoir, but decreases the high frequency components. For long dams, the effects of spatially incoherent ground motions are qualitatively different and can be much greater than those due to surface travelling waves. 3 refs., 3 figs

  15. the effect of age of dam on weaning mass for ftve dam breed types

    African Journals Online (AJOL)

    SUMMARY: The effect of age of dam on adjusted 210 day calf weaning mass was estimated by the Least Squares method for 5 dam types on 2 farms. ... the later maturing breeds would have a low level of productivity because these cows would be eliminated in their potentially prime .... time at 28 (2A) or 3l (28) months old.

  16. Proceeding of the public safety around dams conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    The Canadian Dam Association hosted the Public Safety Around Dams workshop in which presentations were given in the morning to describe the different measures and methods implemented by the Ontario Ministry of Natural Resources, Ontario Power Generation and others to improve safety around dams. In the afternoon, the participants toured the Auburn and Lakefield dams and facilities to view the infrastructures and equipment. A roundtable discussion concluded the day. Following this workshop, a Public Safety Around Dams group was created on the social network site, LinkedIn. This conference featured 6 presentations, 3 of which have been catalogued separately for inclusion in this database.

  17. CEA Annual progress report 1986

    International Nuclear Information System (INIS)

    1987-01-01

    This annual report presents the general organization of the CEA, the international relations and politics in nuclear field, the activities (military application, nuclear applied research, ANDRA (National Agency for Radioactive Waste Management), nuclear safety and protection, fundamental research, applied research other than nuclear), the industrial group; among topics about men and means, the budget execution of the public establishment of research. In annex, the nuclear power plants around the world and the principal legislative texts related to CEA or atomic energy published in 1986 [fr

  18. Major dams of the United States, Geographic NAD83, USGS (2006) [dams00x020_USGS_2006

    Data.gov (United States)

    Louisiana Geographic Information Center — This map layer portrays major dams of the United States, including Puerto Rico and the U.S. Virgin Islands. The map layer was created by extracting dams 50 feet or...

  19. Geodetic deformation monitoring at Pendidikan Diponegoro Dam

    Science.gov (United States)

    Yuwono, Bambang Darmo; Awaluddin, Moehammad; Yusuf, M. A.; Fadillah, Rizki

    2017-07-01

    Deformation monitoring is one indicator to assess the feasibility of Dam. In order to get the correct result of the deformation, it is necessary to determine appropriate deformation monitoring network and the observation data should be analyse and evaluated carefully. Measurement and analysis of deformation requires relatively accurate data and the precision is high enough, one of the observation method that used is GPS (Global Positioning System). The research was conducted at Pendidikan Undip Dams is Dam which is located in Tembang. Diponegoro Dam was built in 2013 and a volume of 50.86 m3 of water, inundation normal width of up to 13,500 m2. The main purpose of these building is not only for drainage but also for education and micro hydro power plant etc. The main goal of this reasearch was to monitor and analyze the deformation at Pendidikan Undip Dam and to determaine whether GPS measurement could meet accuracy requirement for dam deformation measurements. Measurements were made 2 times over 2 years, 2015 and 2016 using dual frequency GPS receivers with static methods and processed by Scientific Software GAMIT 10.6

  20. Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Tiffan, Kenneth F.; Haskell, Craig A.; Kock, Tobias J.

    2008-12-01

    In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific

  1. Energy Division annual progress report for period ending September 30, 1988

    International Nuclear Information System (INIS)

    1989-06-01

    The goals and accomplishments of the Energy Division of Oak Ridge National Laboratory are described in this annual progress report for Fiscal Year (FY) 1988. The Energy Division is a multidisciplinary research organization committed to (1) increasing the knowledge and understanding of the way society makes choices in energy use and energy-using technologies, (2) improving society's understanding of the environmental implications of changes in energy technology, and (3) improving and developing new energy-efficient technologies. The Energy Division's programmatic activities focus on four major areas: (1) analysis and assessment, (2) transportation and decision systems research, (3) technology research and development for improving the efficiency of energy and end-use technologies, and (4) electric power systems. The Division's total expenditures in FY 1988 were $44.3 million. The work is supported by the US Department of Energy, US Department of Defense, many other federal agencies, and some private organizations. Disciplines of the 139 staff members include engineering, social sciences, physical and life sciences, and mathematics and statistics

  2. Development and application of the electrochemical etching technique. Annual progress report

    Energy Technology Data Exchange (ETDEWEB)

    1980-08-01

    This annual progress report documents further advances in the development and application of electrochemical etching of polycarbonate foils (ECEPF) for fast, intermediate, and thermal neutron dosimetry as well as alpha particle dosimetry. The fast (> 1.1 MeV) and thermal neutron dosimetry techniques were applied to a thorough investigation of the neutron contamination inherent in and about the primary x-ray beam of several medical therapy electron accelerators. Because of the small size of ECEPF dosimeters in comparison to other neutron meters, they have an unusually low perturbation of the radiation field under measurement. Due to this small size and the increased sensitivity of the ECEPF dosimeter over current techniques of measuring neutrons in a high photon field, the fast neutron contamination in the primary x-ray beam of all the investigated accelerators was measured with precision and found to be greater than that suggested by the other, more common, neutron dosimetry methods.

  3. Development and application of the electrochemical etching technique. Annual progress report

    International Nuclear Information System (INIS)

    1980-08-01

    This annual progress report documents further advances in the development and application of electrochemical etching of polycarbonate foils (ECEPF) for fast, intermediate, and thermal neutron dosimetry as well as alpha particle dosimetry. The fast (> 1.1 MeV) and thermal neutron dosimetry techniques were applied to a thorough investigation of the neutron contamination inherent in and about the primary x-ray beam of several medical therapy electron accelerators. Because of the small size of ECEPF dosimeters in comparison to other neutron meters, they have an unusually low perturbation of the radiation field under measurement. Due to this small size and the increased sensitivity of the ECEPF dosimeter over current techniques of measuring neutrons in a high photon field, the fast neutron contamination in the primary x-ray beam of all the investigated accelerators was measured with precision and found to be greater than that suggested by the other, more common, neutron dosimetry methods

  4. Subseabed disposal program annual report, January-December 1980. Volume II. Appendices (principal investigator progress reports). Part 1

    International Nuclear Information System (INIS)

    Hinga, K.R.

    1981-07-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-Q; Part 2 contains Appendices R-MM. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base

  5. Subseabed disposal program annual report, January-December 1980. Volume II. Appendices (principal investigator progress reports). Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Hinga, K.R. (ed.)

    1981-07-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-Q; Part 2 contains Appendices R-MM. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base.

  6. Annual Report on Waste Generation and Waste Minimization Progress, 1991--1992

    International Nuclear Information System (INIS)

    1994-02-01

    This report is DOE's first annual report on waste generation and waste minimization progress. Data presented in this report were collected from all DOE sites which met minimum threshold criteria established for this report. The fifty-seven site submittals contained herein represent data from over 100 reporting sites within 25 states. Radioactive, hazardous and sanitary waste quantities and the efforts to minimize these wastes are highlighted within the fifty-seven site submittals. In general, sites have made progress in moving beyond the planning phase of their waste minimization programs. This is evident by the overall 28 percent increase in the total amount of materials recycled from 1991 to 1992, as well as individual site initiatives. During 1991 and 1992, DOE generated a total of 279,000 cubic meters of radioactive waste and 243,000 metric tons of non-radioactive waste. These waste amounts include significant portions of process wastewater required to be reported to regulatory agencies in the state of Texas and the state of Tennessee. Specifically, the Pantex Plant in Texas treats an industrial wastewater that is considered by the Texas Water Commission to be a hazardous waste. In 1992, State regulated wastewater from the Pantex Plant represented 3,620 metric tons, 10 percent of the total hazardous waste generated by DOE. Similarly, mixed low-level wastewater from the TSCA Incinerator Facility at the Oak Ridge K-25 Site in Tennessee represented 55 percent of the total radioactive waste generated by DOE in 1992

  7. Annual Report on Waste Generation and Waste Minimization Progress, 1991--1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report is DOE`s first annual report on waste generation and waste minimization progress. Data presented in this report were collected from all DOE sites which met minimum threshold criteria established for this report. The fifty-seven site submittals contained herein represent data from over 100 reporting sites within 25 states. Radioactive, hazardous and sanitary waste quantities and the efforts to minimize these wastes are highlighted within the fifty-seven site submittals. In general, sites have made progress in moving beyond the planning phase of their waste minimization programs. This is evident by the overall 28 percent increase in the total amount of materials recycled from 1991 to 1992, as well as individual site initiatives. During 1991 and 1992, DOE generated a total of 279,000 cubic meters of radioactive waste and 243,000 metric tons of non-radioactive waste. These waste amounts include significant portions of process wastewater required to be reported to regulatory agencies in the state of Texas and the state of Tennessee. Specifically, the Pantex Plant in Texas treats an industrial wastewater that is considered by the Texas Water Commission to be a hazardous waste. In 1992, State regulated wastewater from the Pantex Plant represented 3,620 metric tons, 10 percent of the total hazardous waste generated by DOE. Similarly, mixed low-level wastewater from the TSCA Incinerator Facility at the Oak Ridge K-25 Site in Tennessee represented 55 percent of the total radioactive waste generated by DOE in 1992.

  8. Investigating leaks in dams and reservoirs

    International Nuclear Information System (INIS)

    2003-01-01

    Millions of people throughout the world depend on dams and reservoirs for electricity, water and flood protection. Dams require significant investment to build and maintain, and yet their usefulness and integrity are constantly threatened by leakage and sedimentation. Isotope hydrology techniques, combined with conventional analytical methods, are a cost-effective tool to reduce such threats. The International Atomic Energy Agency is promoting their use to protect these investments and improve management, particularly by supporting specialized teams of scientists and engineers to investigate dam leakage in African countries on request. (IAEA)

  9. A study on the effect of a broken large sabo dam on the sediment transportation in channel - an example of Baling-sabo-dam

    Science.gov (United States)

    Tseng, W. H.; Shieh, C. L.; Lee, S. P.; Tsang, Y. C.

    2009-04-01

    To retard the sediment transportation and its effect on the reservoir, large sabo dams are built in the main channel of the reservoir watershed in Taiwan. Therefore, these large sabo dams affect upstream, downstream, and the reservoir significantly if the dam breaks. There was about 450 mm of rain fell in the reservoir watershed during typhoon Wipha that struck Taiwan on 17-19, September, 2007. This heavy rainfall caused the Baling-sabo-dam broken about 60 m of the upper Dahan Creek in the Shimen Reservoir watershed. The dam, built in 1977, is 38 m in height, 80 m in width, and is designed to reserve sediment materials about 10 million m3. The upper river bed was diminished maximum to 20 m in a month; the deposited and affected areas are unable to estimate and still required to be observed. The main purpose of this paper is to analyze the topographic characteristic of the channel after the dam broke according to the topographic and surveyed data before and after the dam broke. The longitudinal profile and the cross section data show the effects to the channel after the dam break and the channel is able to classify in several sections. A simple comparison of the sediment discharge estimated from the hydrologic data with the topographic survey data is also analyzed. Keywords:dam break, sabo dam, sediment discharge

  10. Twenty-ninth annual progress report of the Pennsylvania State University Breazeale Nuclear Reactor, July 1, 1983-June 30, 1984

    International Nuclear Information System (INIS)

    Levine, S.H.; Totenbier, R.E.

    1984-07-01

    The twenty-ninth annual progress report of the operation of the Pennsylvania State University Breazeale Reactor is submitted in accordance with the requirements of Contract DE-AC02-76ER03409 with the United States Department of Energy. This report also provides the University administration with a summary of the operation of the facility for the past year

  11. The Grand Ethiopian Renaissance Dam and Ethiopia's Succession ...

    African Journals Online (AJOL)

    Tadesse Kassa Woldetsadik

    2013-06-01

    Jun 1, 2013 ... Dam concessions engendered detrimental impacts on Ethiopia's riparian rights ... control works on the Aswan High and the Roseires dams. Disturbed by the ... hegemonic control that would inevitably ensue from construction of the Dam ...... Projects Implementation Division AAAID, Sudan, p.1. 39 Ibid.

  12. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, M.; McKinstry, C.; Cook, C.

    2004-01-01

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish were entrained annually at Grand Coulee Dam. Analysis of the entrainment data found that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the third year of the strobe light study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The objective of the study is to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions. The prototype system consists of six strobe lights affixed to an aluminum frame suspended 15 m vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, illuminate a region directly upstream of the barge. The 2003 study period extended from June 16 through August 1. Three light treatments were used: all six lights on for 24 hours, all lights off for 24 hours, and three of six lights cycled on and off every hour for 24 hours. These three treatment conditions were assigned randomly

  13. Dam failure analysis/calibration using NWS models on dam failure in Alton, New Hampshire

    International Nuclear Information System (INIS)

    Capone, E.J.

    1998-01-01

    The State of New Hampshire Water Resources Board, the United States Geological Service, and private concerns have compiled data on the cause of a catastrophic failure of the Bergeron Dam in Alton, New Hampshire in March of 1996. Data collected related to the cause of the breach, the breach parameters, the soil characteristics of the failed section, and the limits of downstream flooding. Dam break modeling software was used to calibrate and verify the simulated flood-wave caused by the Bergeron Dam breach. Several scenarios were modeled, using different degrees of detail concerning the topography/channel-geometry of the affected areas. A sensitivity analysis of the important output parameters was completed. The relative importance of model parameters on the results was assessed against the background of observed historical events

  14. Progress Report

    Science.gov (United States)

    2018-05-16

    This report summarizes the annual progress of EPA’s Clean Air Markets Programs such as the Acid Rain Program (ARP) and the Cross-State Air Pollution Rule (CSAPR). EPA systematically collects data on emissions, compliance, and environmental effects, these data are highlighted in our Progress Reports.

  15. STABILITAS CHECK DAM DI ARBORETUM DESA SUMBER BRANTAS

    Directory of Open Access Journals (Sweden)

    Endang Purwati

    2012-09-01

    Full Text Available Abstract: The stability of check-dam in arboretum of Sumber Brantas village. Sumber Brantas water sources area is arboretum territory which has to be maintained as conservation either for technical or vegetation (plants cover by sustainable development. Arboretum territory is made as asylum in irrigation system district of Brantas River. This research discusses technical conservation activity to build the check dam in conserving the area. Check dam is built dimensionally by using HEC-RAS Program to get safe and stable dimension for rolling, shifting and piping of Sf > 1.5, and based on hydrologic analysis to get maximum flood discharge of 48.01 m3second-1. Hydraulic analysis is used to get water level profile and pressure for the dam body. Stability of the structure will be controlled by construction load (weight of check dam and its fully sediment storage condition. The result of this research shows that the safe and stable dimension for check dam are as follows: 28 meter of width; 3 meter of main height; 1.5 meter of sub-height; 10 meter of stilling basin length (Main Dam–Sub Dam.

  16. The blind men meet the elephant at the dam: Alternative spatial and taxonomic components reveal different insights about how low-head dams impact fish biodiversity

    Science.gov (United States)

    Fencl, Jane S.; Mather, Martha E.; Smith, Joseph M.; Hitchman, Sean M.

    2017-01-01

    Dams are ubiquitous environmental impacts that threaten aquatic ecosystems. The ability to compare across research studies is essential to conserve the native biodiversity that is impacted by the millions of low‐head dams that currently fragment streams and rivers. Here, we identify a previously unaddressed obstacle that impedes this generalization. Specifically, divergent spatial and taxonomic approaches that result from different conceptualizations of the dam‐biodiversity problem can produce conflicting science‐based conclusions about the same dam impact. In this research, using the same dammed and undammed sites, we evaluated the scientific generality of different conceptualizations of the dam‐biodiversity problem. We compared two different but commonly used spatial approaches—(1) above dam–below dam vs. (2) undammed–dammed comparisons—and 11 different, commonly used taxonomic approaches (three assemblage summaries, eight guilds). Sites above the dam structure had less diverse fish assemblages than sites below dams, whereas sites below the dam structure were similar to undammed sites. Thus, spatial approach 1 detected a large dam effect and spatial approach 2 detected a small dam effect. Similarly, some taxonomic responses (species richness, diversity, abundance, and number of guilds) detected large dam effects; other responses detected small (riffle specialist guild) or no dam effects (pool generalists). In summary, our results showed that how the problem was framed altered scientific conclusions and created different dam realities. The metaphor of how individual blind men disagree about the structure of an elephant, based on examinations of different body parts, reinforces the need for a coordinated, holistic perspective on dam research. Although no single approach is adequate for all problems, identifying the form, consequences of, and relationships among different research conceptualizations will set the stage for future syntheses of dam

  17. Seismic response of uplifting concrete gravity dams

    International Nuclear Information System (INIS)

    Leger, P.; Sauve, G.; Bhattacharjee, S.

    1992-01-01

    The foundation interaction effects on the seismic response of dam-foundation systems have generally been studied using the linear elastic finite element models. In reality, the foundation can not develop effective tensile stresses to a significant degree along the interface. A two-dimensional finite element model, in which nonlinear gap elements are used at the dam-foundation interface to determine the uplift response of concrete gravity dams subjected to seismic loads, is presented. Time domain analyses were performed for a wide range of modelling assumptions such as dam height, interface uplift pressure, interface mesh density, and earthquake input motions, that were systematically varied to find their influence on the seismic response. The nonlinear interface behavior generally reduces the seismic response of dam-foundation systems acting as a seismic isolation mechanism, and may increase the safety against sliding by reducing the base shear transmitted to the foundation. 4 refs., 5 figs., 6 tabs

  18. Estimation of annual suspended-sediment fluxes, 1931-95, and evaluation of geomorphic changes, 1950-2010, in the Arkansas River near Tulsa, Oklahoma

    Science.gov (United States)

    Lewis, Jason M.; Smith, S. Jerrod; Buck, Stephanie D.; Strong, Scott A.

    2011-01-01

    An understanding of fluvial sediment transport and changing channel morphology can assist planners in making responsible decisions with future riverine development or restoration projects. Sediment rating curves can serve as simple models and can provide predictive tools to estimate annual sediment fluxes. Sediment flux models can aid in the design of river projects by providing insight to past and potential future sediment fluxes. Historical U.S. Geological Survey suspended-sediment and discharge data were evaluated to estimate annual suspended-sediment fluxes for two stations on the Arkansas River located downstream from Keystone Dam in Tulsa County. Annual suspended-sediment fluxes were estimated from 1931-95 for the Arkansas River at Tulsa streamflow-gaging station (07164500) and from 1973-82 for the Arkansas River near Haskell streamflow-gaging station (07165570). The annual flow-weighted suspended-sediment concentration decreased from 1,970 milligrams per liter to 350 milligrams per liter after the completion of Keystone Dam at the Tulsa station. The streambed elevation at the Arkansas River at Tulsa station has changed less than 1 foot from 1970 to 2005, but the thalweg has shifted from a location near the right bank to a position near the left bank. There was little change in the position of most of the banks of the Arkansas River channel from 1950 to 2009. The most substantial change evident from visual inspection of aerial photographs was an apparent decrease in sediment storage in the form of mid-channel and meander bars. The Arkansas River channel between Keystone Dam and the Tulsa-Wagoner County line showed a narrowing and lengthening (increase in sinuosity) over the transition period 1950-77 followed by a steady widening and shortening of the river channel (decrease in sinuosity) during the post-dam (Keystone) periods 1977-85, 1985-2003, and 2003-10.

  19. Seismic performance assessment of latyan concrete buttress dam ...

    African Journals Online (AJOL)

    In order to design earthquake resistant dams and evaluate the safety of existing dams that will be exposed to future earthquakes, it is essential to have accurate and reliable analysis procedures to predict the stresses and deformations in dams subjected to earthquake ground motion. For a damwater- foundation system, the ...

  20. Walden North Dam overtopping : emergency response and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, S. [FortisBC Inc., South Slocan, BC (Canada); McCreanor, J. [Acres International Ltd., Calgary, AB (Canada); Cronin, D.L.R.; Daw, D. [Acres International Ltd., Vancouver, BC (Canada)

    2004-09-01

    This paper described the events that led to the overtopping of the Walden North Dam during a heavy rainfall in June 2002, resulting in a breach around an abutment wall. The dam is part of a run-of-river hydro development on Cayoosh Creek near Lillooet, British Columbia. The Walden North Dam was a low, 46 meter wide concrete dam with a single radial gate. The dam overtopping was attributed to failure of the radial gate hoist. Prior to this event, the dam had been classified by the British Columbia Dam Safety Authorities as a high and then a low consequence category of failure. As facility managers, Aquila Networks Canada Ltd. established an immediate action plan to stabilize the situation and resume normal power production by applying the following priorities: (1) ensure safety of workers and the public, (2) limit further damage to the dam and other facilities, (3) ensure environmental protection, and (4) continue to operate the generation units. Local authorities were informed to evacuate a downstream campsite and environmental agencies were contacted along with safety regulators. Repairs included demolition of the damaged portion of the structure and construction a new two-bay gate/stoplog spillway and bridge. Construction was completed by September 2003 according to the requirements of the Department of Fisheries and Oceans for minimum flow, accurate control of fish flows and environmental monitoring of the stream area. 10 figs.

  1. Developing an integrated dam safety program

    International Nuclear Information System (INIS)

    Nielsen, N. M.; Lampa, J.

    1996-01-01

    An effort has been made to demonstrate that dam safety is an integral part of asset management which, when properly done, ensures that all objectives relating to safety and compliance, profitability, stakeholders' expectations and customer satisfaction, are achieved. The means to achieving this integration of the dam safety program and the level of effort required for each core function have been identified using the risk management approach to pinpoint vulnerabilities, and subsequently to focus priorities. The process is considered appropriate for any combination of numbers, sizes and uses of dams, and is designed to prevent exposure to unacceptable risks. 5 refs., 1 tab

  2. Case Study: Effects of a Partial-Debris Dam on Riverbank Erosion in the Parlung Tsangpo River, China

    Directory of Open Access Journals (Sweden)

    Clarence Edward Choi

    2018-02-01

    Full Text Available This paper examines two successive debris flows that deposited a total of 1.4 million m3 of sediment into the Parlung Tsangpo River in China in 2010. As a result of these deposits, a partial-debris dam was formed in the river. This dam rerouted the discharge in the river along one of the riverbanks, which supported a highway. The rerouted discharge eroded the riverbank and the highway eventually collapsed. To enhance our understanding of the threat posed by partial-debris dams, a field investigation was carried out to measure the discharge in the river and to collect soil samples of the collapsed riverbank. Findings from the field investigation were then used to back-analyze fluvial erosion along the riverbank using a combined erosion framework proposed in this study. This combined framework adopts a dam-breach erosion model which can capture the progressive nature of fluvial erosion by considering the particle size distribution of the soil being eroded. The results from the back-analysis were then evaluated against unique high-resolution images obtained from satellites. This case study not only highlights the consequences of the formation of partial-debris dams on nearby infrastructure, but it also proposes the use of a combined erosion framework to provide a first-order assessment of riverbank stability. Unique high-resolution satellite images are used to assess the proposed erosion framework and key challenges in assessing erosion are discussed.

  3. Thermal monitoring of leakage through Karkheh embankment dam, Iran

    Energy Technology Data Exchange (ETDEWEB)

    Mirghasemi, A.A.; Bagheri, S.M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering; Heidarzadeh, M. [Tehran Univ., Tehran (Iran, Islamic Republic of). Dept. of Civil Engineering]|[Mahab Ghodss Consulting Engineers, Tehran (Iran, Islamic Republic of)

    2007-07-01

    A newly developed and simple method for monitoring seepage in embankment dams was presented. The method of temperature measurement is based on the fact that a change in permeability results in a change in seepage flow, thereby causing a temperature change that can be readily measured in the dam body and foundation. In this study, water leaking through the Karkheh embankment dam was thermally analyzed to determine a pattern and amount of water seepage. With nearly 33 million cubic metres of fill, the Karkheh earth and rock-fill dam is the largest dam in Iran. Construction was completed in 2000. The thermal processes in the embankment were studied due to the dam's complex thermo-hydraulic behaviour. Thermal data was collected and analyzed during construction and operation of the dam. This paper presented the temperature variations for the different dam zones, including core, upstream shell, downstream shell, upstream filter, downstream filter and the plastic concrete cut-off wall. It was determined that the clay core works very well as an impermeable curtain. It was also shown that temperature variations of the Karkheh reservoir water is seasonal, and decrease as water depth increases. The reservoir water temperature remains constant beyond depths of 60 metres. The thermal behaviour of the core is not similar to that of the reservoir, indicating a very low value of seepage through the core. The pattern of temperature variations in the upstream shell in the left abutment is harmonic, while in the right abutment it is not harmonic. A harmonic pattern of temperature variation exists in some aquifers of the dam foundation, indicating high seepage through these aquifers. The Karkheh dam cut-off wall performs satisfactorily. It was determined that one dimensional equations for estimating seepage cannot be applied for the Karkheh dam. 17 refs., 11 figs.

  4. Grouting Applications in Cindere Dam

    Directory of Open Access Journals (Sweden)

    Devrim ALKAYA

    2011-01-01

    Full Text Available Grouting is one of the most popular method to control the water leakage in fill dam constructions. With this regard this method is widely used in all the world. Geological and geotechnical properties of rock are important parameters affect the design of grouting. In this study, geotechnical properties of Cindere Dam's base rock and the grouting prosedure have been investigated with grouting pressure.

  5. Sinkhole investigated at B.C. Hydro's Bennett Dam

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro's W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig

  6. Plugs or flood-makers? the unstable landslide dams of eastern Oregon

    Science.gov (United States)

    Safran, Elizabeth B.; O'Connor, Jim E.; Ely, Lisa L.; House, P. Kyle; Grant, Gordon E.; Harrity, Kelsey; Croall, Kelsey; Jones, Emily

    2015-01-01

    Landslides into valley bottoms can affect longitudinal profiles of rivers, thereby influencing landscape evolution through base-level changes. Large landslides can hinder river incision by temporarily damming rivers, but catastrophic failure of landslide dams may generate large floods that could promote incision. Dam stability therefore strongly modulates the effects of landslide dams and might be expected to vary among geologic settings. Here, we investigate the morphometry, stability, and effects on adjacent channel profiles of 17 former and current landslide dams in eastern Oregon. Data on landslide dam dimensions, former impoundment size, and longitudinal profile form were obtained from digital elevation data constrained by field observations and aerial imagery; while evidence for catastrophic dam breaching was assessed in the field. The dry, primarily extensional terrain of low-gradient volcanic tablelands and basins contrasts with the tectonically active, mountainous landscapes more commonly associated with large landslides. All but one of the eastern Oregon landslide dams are ancient (likely of order 103 to 104 years old), and all but one has been breached. The portions of the Oregon landslide dams blocking channels are small relative to the area of their source landslide complexes (0.4–33.6 km2). The multipronged landslides in eastern Oregon produce marginally smaller volume dams but affect much larger channels and impound more water than do landslide dams in mountainous settings. As a result, at least 14 of the 17 (82%) large landslide dams in our study area appear to have failed cataclysmically, producing large downstream floods now marked by boulder outwash, compared to a 40–70% failure rate for landslide dams in steep mountain environments. Morphometric indices of landslide dam stability calibrated in other environments were applied to the Oregon dams. Threshold values of the Blockage and Dimensionless Blockage Indices calibrated to worldwide

  7. A New Approach for Structural Monitoring of Large Dams with a Three-Dimensional Laser Scanner

    Directory of Open Access Journals (Sweden)

    José Sánchez

    2008-09-01

    Full Text Available Driven by progress in sensor technology, computer methods and data processing capabilities, 3D laser scanning has found a wide range of new application fields in recent years. Particularly, monitoring the static and dynamic behaviour of large dams has always been a topic of great importance, due to the impact these structures have on the whole landscape where they are built. The main goal of this paper is to show the relevance and novelty of the laserscanning methodology developed, which incorporates different statistical and modelling approaches not considered until now. As a result, the methods proposed in this paper have provided the measurement and monitoring of the large “Las Cogotas” dam (Avila, Spain.

  8. The geomorphic legacy of small dams — An Austrian study

    NARCIS (Netherlands)

    Poeppl, R.E.; Keesstra, S.D.; Hein, T.

    2015-01-01

    Dams represent one of the most dominant forms of human impact upon fluvial systems during the Anthropocene, as they disrupt the downstream transfer of water and sediments. Removing dams restores river continuity and channel morphology. Both dam construction and dam removal induce geomorphic channel

  9. Potential hydroelectric power. Vertical turbine: spillway combine Broadwater Dam. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Willer, D.C.

    1979-04-23

    A feasibility study was made of the hydroelectric power potential at Broadwater Dam in western Montana. Two alternative configurations for the potential project were evaluated and the economics of four possible sources of project funding were assessed. The configurations analyzed were an apron-mounted configuration, in which the turbine-generator units are located on the downstream apron of the existing dam, and a conventional configuration, in which the units are located in a new powerhouse adjacent to the existing dam. The funding sources considered were the Department of Energy loan program, the United States Bureau of Reclamation PL-984 loan program and conventional revenue bonds, both taxable and tax-exempt. The optimal project alternative was determined to be the apron-mounted configuration. The final choice of funding would be dependent on the power purchaser. It was shown that, regardless of the configuraton or funding source selected, the project would be feasible. The cost of the apron-mounted configuration, which would consist of four turbine-generator units for a total installed capacity of 9.76 MW, was estimated as $13,250,000 with financing provided by either a PL-984 loan or tax-exempt bonds. The cost per installed kilowatt was therefore $1,350, and the cost per kilowatt-hour was 19.6 mills. The average annual energy was estimated to be 56.44 million kWh, the equivalent of approximately 87,000 barrels of oil per y. It is therefore recommended that the Montana Department of Natural Resources and Conservation proceed with the project and that discussions be initiated with potential power purchasers as soon as possible.

  10. Examination of dam induced sedimentation of small reservoir near Brennbergbánya

    Science.gov (United States)

    Csáfordi, P.; Kalicz, P.; Gribovszki, Z.; Kucsara, M.

    2009-04-01

    The dams' affects on the stream system also involve accelerated sedimentation of reservoirs, change of water and sediment regime. In consequence of sedimentation the lifetime and the recreational potential of reservoirs decrease and management practices have to be applied. The area of our study is a small forested catchment, where the erosion of forested land and the sedimentation of Brennberg Reservoir were investigated in relationship with each other. The Brennberg Reservoir has been built in 1981. It has been silting up forcefully since that time. It has to be dredged with hydraulic earth-moving to preserve its landscape-aesthetical function for the future. We have surveyed the surface to establish the rate of sedimentation. The results of this measurement were processed with a GIS software (named Digiterra Map). There were several uncertainties during our surveying in the field. Therefore three other methods were applied based on GIS and a simply mathematical calculation. The amount of deposited sediment was determined with these methods. Then we compared the results to each other. The annual specific soil loss was estimated according to results of our measurement. Keywords: dam impact, reservoir sedimentation, GIS

  11. Large-scale dam removal on the Elwha River, Washington, USA: fluvial sediment load

    Science.gov (United States)

    Magirl, Christopher S.; Hilldale, Robert C.; Curran, Christopher A.; Duda, Jeffrey J.; Straub, Timothy D.; Domanski, Marian M.; Foreman, James R.

    2015-01-01

    The Elwha River restoration project, in Washington State, includes the largest dam-removal project in United States history to date. Starting September 2011, two nearly century-old dams that collectively contained 21 ± 3 million m3 of sediment were removed over the course of three years with a top-down deconstruction strategy designed to meter the release of a portion of the dam-trapped sediment. Gauging with sediment-surrogate technologies during the first two years downstream from the project measured 8,200,000 ± 3,400,000 tonnes of transported sediment, with 1,100,000 and 7,100,000 t moving in years 1 and 2, respectively, representing 3 and 20 times the Elwha River annual sediment load of 340,000 ± 80,000 t/y. During the study period, the discharge in the Elwha River was greater than normal (107% in year 1 and 108% in year 2); however, the magnitudes of the peak-flow events during the study period were relatively benign with the largest discharge of 292 m3/s (73% of the 2-year annual peak-flow event) early in the project when both extant reservoirs still retained sediment. Despite the muted peak flows, sediment transport was large, with measured suspended-sediment concentrations during the study period ranging from 44 to 16,300 mg/L and gauged bedload transport as large as 24,700 t/d. Five distinct sediment-release periods were identified when sediment loads were notably increased (when lateral erosion in the former reservoirs was active) or reduced (when reservoir retention or seasonal low flows and cessation of lateral erosion reduced sediment transport). Total suspended-sediment load was 930,000 t in year 1 and 5,400,000 t in year 2. Of the total 6,300,000 ± 3,200,000 t of suspended-sediment load, 3,400,000 t consisted of silt and clay and 2,900,000 t was sand. Gauged bedload on the lower Elwha River in year 2 of the project was 450,000 ± 360,000 t. Bedload was not quantified in year 1, but qualitative observations using bedload

  12. Estimating flood inundation caused by dam failures

    Energy Technology Data Exchange (ETDEWEB)

    Mocan, N. [Crozier and Associates Inc., Collingwood, ON (Canada); Joy, D.M. [Guelph Univ., ON (Canada). School of Engineering; Rungis, G. [Grand River Conservation Authority, Cambridge, ON (Canada)

    2006-01-15

    Recent advancements in modelling inundation due to dam failures have allowed easier and more illustrative analyses of potential outcomes. This paper described new model and mapping capabilities available using the HEC-RAS hydraulic model in concert with geographic information systems (GIS). The study area was the upper reaches of Canagagigue Creek and the Woolwich Dam near Elmira, Ontario. A hydraulic analysis of a hypothetical dam failure was developed based on the summer probable maximum flood (PMF) event. Limits extended from Woolwich Dam to downstream of the Town of Elmira. An incoming summer PMF hydrograph was set as the upstream boundary condition in the upstream model. Simulation parameters include simulation time-step; implicit weighting factor; water surface calculation tolerance; and output calculation interval. Peak flows were presented, as well as corresponding flood inundation results through the Town of Elmira. The hydraulic model results were exported to a GIS in order to develop inundation maps for emergency management planning. Results from post-processing included inundation maps for each of the simulated time-steps as well as an inundation animation for the duration of the dam breach. It was concluded that the modelling tools presented in the study can be applied to other dam safety assessment projects in order to develop effective and efficient emergency preparedness plans through public consultation and the establishment of impact zones. 1 tab., 2 figs.

  13. Dynamic analyzing procedures adopted for concrete-faced rockfill dams in Turkey

    Energy Technology Data Exchange (ETDEWEB)

    Tosun, H. [Dam Safety Association, Ankara (Turkey); Tosun, K. [TVT Hydrotech Bureau, Ankara (Turkey)

    2008-07-01

    A concrete faced rockfill dam (CFRD) has some advantages compared to other embankment types. The advantages include minimal settlement problems through the use of compacted rockfill; increased overall stability of the dam since the water pressure acts on the upstream face; and pore water pressure does not develop in the rockfill zone if it is well designed and constructed. It is thought that well-compacted CFRD has a high resistance to earthquake loading, as based on several factors including acceptable past performance of similar dams. While numerical solutions performed for this type of dams indicate that it is as safe as other embankment dams, their behavior is still questionable when they are subjected to severe seismic loading. This paper outlined the key principals of the dynamic analyzing method adopted for CFRDs in Turkey and summarized the practice of CFRDs with heights ranging from 54 to 135 metres throughout the country. Two-dimensional finite element models were executed to estimate displacements on the crest under the different loadings of earthquake. Dams that were discussed included the Kurtun Dam, the Torul Dam, the Atasu Dam, the Dim Dam, the Gordes Dam, and the Marmaris Dam. The paper also discussed the limitation about permanent settlement provided in the national dam specification and introduced the results obtained from a case study of the Pamukluk Dam located in southern Turkey. Geology and geotechnics as well as the embankment details and materials were discussed. The case study also summarized the selection of seismic parameters and dynamic analyses. 35 refs., 1 tab., 8 figs.

  14. Hydrogeophysical investigations at Hidden Dam, Raymond, California

    Science.gov (United States)

    Minsley, Burke J.; Burton, Bethany L.; Ikard, Scott; Powers, Michael H.

    2011-01-01

    Self-potential and direct current resistivity surveys are carried out at the Hidden Dam site in Raymond, California to assess present-day seepage patterns and better understand the hydrogeologic mechanisms that likely influence seepage. Numerical modeling is utilized in conjunction with the geophysical measurements to predict variably-saturated flow through typical two-dimensional dam cross-sections as a function of reservoir elevation. Several different flow scenarios are investigated based on the known hydrogeology, as well as information about typical subsurface structures gained from the resistivity survey. The flow models are also used to simulate the bulk electrical resistivity in the subsurface under varying saturation conditions, as well as the self-potential response using petrophysical relationships and electrokinetic coupling equations.The self-potential survey consists of 512 measurements on the downstream area of the dam, and corroborates known seepage areas on the northwest side of the dam. Two direct-current resistivity profiles, each approximately 2,500 ft (762 m) long, indicate a broad sediment channel under the northwest side of the dam, which may be a significant seepage pathway through the foundation. A focusing of seepage in low-topography areas downstream of the dam is confirmed from the numerical flow simulations, which is also consistent with past observations. Little evidence of seepage is identified from the self-potential data on the southeast side of the dam, also consistent with historical records, though one possible area of focused seepage is identified near the outlet works. Integration of the geophysical surveys, numerical modeling, and observation well data provides a framework for better understanding seepage at the site through a combined hydrogeophysical approach.

  15. Seepage problem in Papan dam and the treatment

    Energy Technology Data Exchange (ETDEWEB)

    Sharghi, A. [JTMA Co., Tehran (Iran, Islamic Republic of); Palassi, M. [Tehran Univ. (Iran, Islamic Republic of). Dept. of Civil Engineering

    2003-07-01

    The Papan dam in the Krygyz Republic is 97 metres high. It is located in the Osh Oblast, within a narrow and steep sided gorge on the Ak-Bura River, approximately 20 kilometres south of the City of Osh. The impoundment of the dam revealed large inflows of water to the downstream dam through the upper half of the dam and through the joints in the right abutment. A number of options were considered before a treatment method was selected. The causes of the leakage were poor grouting, and joints and fissures in the abutment. The remedial process involved the use of a plastic concrete cutoff wall extended from the crest of the dam to a depth of approximately 70 metres, in addition to the use of a grouting curtain in the right abutment. 2 figs.

  16. Design and Construction of Dams, Reservoirs, and Balancing Lakes

    International Nuclear Information System (INIS)

    Lemperiere, F.

    2003-01-01

    The general data presented in sections two and three gives an idea of the extreme diversity of the millions of very large or very small dams worldwide. Dam design and construction methods for the most usual types of large dams are presented and justified in section four. The possibility and usefulness of building as many dams in the 21. century as have been built in the 20. is analyzed in section six. (author)

  17. Annual progress report 1980

    International Nuclear Information System (INIS)

    1981-01-01

    The technical support activities of the IPSN to competent administrations in 1980 has been marked: namely by the authorizations of divergence for 9 units EdF-PWR of 900 MW, the authorization project of creation and extension of reprocessing plant of COGEMA at the Hague UP 2 -800 and the authorization of starting up of the third unit of production of the EURODIF enrichment plant at Tricastin. On the other hand, IPSN has participated at the elaboration of a certain number of legislative and regulation texts relative to the control of nuclear matter, to radioprotection standards and to criteria of safety. For the safety of breeder, the test made at CABRI pile, in the international research program has given confirmation of the validity of theoretical models used in accidents calculations, hypothetical accidents which has allowed to reactualize safety criteria which have to be used for the development of this type of reactor. In worker radioprotection the results obtained in laboratory on the effect of radon, the progress made in personal dosimetry and the action of radioprotection undertaken in uranium mines constitutes a coherent effort. The deep drilling in granit (1000 m) and the experimental associated program which has finished the indispensable scientific data for the future policy in matter of storage of radioactives wastes. IPSN has contributed to progress made in the rules of exploitation of reactors, in the definition of wastes containment -specially at the output of reprocessing plant- in handling machines in hazardeous areas and in the study of environment [fr

  18. Estimates o the risks associated with dam failure

    Energy Technology Data Exchange (ETDEWEB)

    Ayyaswamy, P.; Hauss, B.; Hseih, T.; Moscati, A.; Hicks, T.E.; Okrent, D.

    1974-03-01

    The probabilities and potential consequences of dam failure in California, primarily due to large earthquakes, was estimated, taking as examples eleven dams having a relatively large population downstream. Mortalities in the event of dam failure range from 11,000 to 260,000, while damage to property may be as high as $720 million. It was assumed that an intensity IX or X earthquake (on the Modified Mercalli Scale) would be sufficient to completely fail earthen dams. Predictions of dam failure were based on the recurrence times of such earthquakes. For the dams studied, the recurrence intervals for an intensity IX earthquake varied between 20 and 800 years; for an intensity X between 50 and 30,000 years. For the Lake Chabot and San Pablo dams (respectively 20, 30 years recurrent earthquake times for a intensity X) the associated consequences are: 34,000 (Lake Chabot) and 30,000 (San Pablo) people killed; damage $140 million and $77 million. Evaculation was found to ameliorate the consequences slightly in most cases because of the short time available. Calculations are based on demography, and assume 10 foot floodwaters will drown all in their path and destroy all one-unit homes in the flood area. Damage estimates reflect losses incurred by structural damage to buildings and do not include loss of income. Hence the economic impact is probably understated.

  19. Environmental Sciences Division annual progress report for period ending September 30, 1982. Environmental Sciences Division Publication No. 2090. [Lead abstract

    Energy Technology Data Exchange (ETDEWEB)

    1983-04-01

    Separate abstracts were prepared for 12 of the 14 sections of the Environmental Sciences Division annual progress report. The other 2 sections deal with educational activities. The programs discussed deal with advanced fuel energy, toxic substances, environmental impacts of various energy technologies, biomass, low-level radioactive waste management, the global carbon cycle, and aquatic and terrestrial ecology. (KRM)

  20. Clinical Investigation Program Annual Progress Report

    Science.gov (United States)

    1988-10-20

    Presented: Interna- tional Symposium on Orthopedics, Mexico , September 1987. Publications: In preparation. 147 FAMC A.P.R. (RCS MED 300) Detail Summary...Infection: A Prospective Study. Presented: 2nd Annual Symposium of the Rocky Moun- tain Flow Cytometry Users Group, Albuquerque, New Mexico , 10-11...Podgore, COL, MC (9) Dept/ISvc: Pediatrics (10) Associate Investigators (11) Key Words: Myron J. Levin, M.D. varicella vaccine U Co. HSC (12

  1. Grouting of karstic arch dam foundation

    Energy Technology Data Exchange (ETDEWEB)

    Young, J.; Rigbey, S. [Acres International, Niagara Falls, ON (Canada)

    2002-07-01

    A 200 m high arch dam and a 2000 MW underground power house complex is under development in the Middle East. The project is located in a highly seismic area in rugged, mountainous terrain. The arch dam is constructed on good quality limestone and dolomitic limestone rock mass, but it contains several zones of disturbed or sheared rock. The basement rock is slightly karstic with hydraulic conductivities in the order of 100 Lugeons. In order to get a satisfactory foundation surface for the dam, it will be necessary to excavate extensively and backfill with concrete. Because of the presence of many clay infilled cavities and fractures, geotechnicians are considering the installation of a multiple row grout curtain to a depth of 150 m below the dam foundation to ensure adequate seepage and uplift parameters when the reservoir is impounded. Initial grouting water pressure test results suggested that the grouting and drainage curtain should be extended to the left abutment beyond the current design. However, when horizontal slide models of the dam abutment were developed using the finite element program SEEPW, it was shown that there is no benefit to extending the length of grout curtains unless they are tied to an area of much lower hydraulic conductivity much deeper in the abutment. 1 tab., 5 figs.

  2. Predictions of total deformations in Jebba main dam by finite ...

    African Journals Online (AJOL)

    This paper examined the deformations of the Jebba Main Dam, Jebba Nigeria using the finite element method. The study also evaluated the predicted deformations and compared them with the actual deformations in the dam to identify possible causes of the observed longitudinal crack at the dam crest. The Jebba dam is a ...

  3. Earthquake induced liquefaction analysis of Tendaho earth-fill dam ...

    African Journals Online (AJOL)

    fill dam, which is part of Tendaho Dam and Irrigation Project; the largest irrigation project in Ethiopia to date. The dam is located in the most seismic part of Ethiopia and was originally designed to be founded on potentially liquefiable alluvium ...

  4. Dams and Obstructions along Iowa's Canoe Routes

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This dataset represents obstruction to canoe and boat users of the canoe routes of Iowa. This may represent actual dams, rock dams (natural or man made), large...

  5. Ririe Dam Release Test Assessment

    Science.gov (United States)

    2013-06-01

    Notes HEC - RAS Location Station (ft) Observation Notes 1420 Ririe Dam Ririe Dam 119,880 Gates opened and initial release started. 1455 115th St...16°F air temperature. Table A2. Observations made on 11 February 2013. Time Location Notes HEC - RAS Location Station (ft) Observation Notes...ERDC/CRREL TR-13-10 52 Time Location Notes HEC - RAS Location Station (ft) Observation Notes Travel Time* (sec) Vel.** (fps) 1224 5th

  6. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lockwood, Jr., Neil [Kalispel Tribe of Indians, Usk, WA (United States); McLellan, Jason G [Washington Department of Fish and Wildlife, Spokane, WA (United States); Crossley, Brian [Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA (United States); O' Connor, Dick

    2001-01-01

    The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project

  7. Grouting design for slope stability of kedung uling earthfill dam

    Directory of Open Access Journals (Sweden)

    Najib

    2018-01-01

    Full Text Available Kedung Uling earthfill dam locates at Wonogiri Regency, Central Java, Indonesia. The dam encountered sliding and settlement at the embankment wall. To minimize sliding and settlement and to optimize the dam, both field investigation and laboratory tests have been proceeded for slope stability analysis and remedial embankment wall. Soil and rock investigation around the dam, which is followed by 10 core drillings, have been conducted. Laboratory tests such as direct shear and index properties have also been carried on. The results were further used for dam slope stability model using slide 6.0 and were used to analyzed factor of safety (FS of Kedunguling dam. 10 conditions of dam were simulated and strengthening body of dam with grouting was designed. The results showed two conditions, which are condition of maximum water level with and without earthquake at downstream, were unsatisfy Indonesia National Standard (SNI for building and infrastructure. These conditions can be managed by using grouting for increasing stabilization of embankment wall. By setting up grouting, factor of safety increases and meet the SNI standard requirement.

  8. Annual Research Progress Report, Fiscal Year 1979,

    Science.gov (United States)

    1979-10-01

    nasopharyngeal angiofibroma : A case report. 63rd Annual Clinical Assembly The Osteopathic College of Ophthalmology and Otolaryngology, May 1979, Sulphur Springs...Combined surgical management of a juvenile nasopharyngeal angiofibroma : A case report. The Laryngoscope. Perry, F.P. Hyperbaric oxygen in the treatment of

  9. Non uniform nature of recorded ground accelerations at dam foundation interface

    Energy Technology Data Exchange (ETDEWEB)

    Ghaemian, Mohsen; Gilani, Morteza Sohrabi [Sharif University of Technology, Tehran, (Iran, Islamic Republic of); Noorzad, Ali [Power and Water University of Technology, Tehran, (Iran, Islamic Republic of)

    2010-07-01

    The Karun III is a double curved concrete arch dam located in Iran which was used to investigate earthquake motions and dam responses. This paper presented the study of the Karun III dam foundation interface. Using an array of 15 accelerometers, two major events that occurred on 2007.11.20 and 2007.11.21 were recorded during dam operation with a PGA at crest of 0.312 g and 0.109.g respectively. A finite element model of Karun III dam was performed. The response of the Karun III dam during the 2007 earthquake was investigated using the NSAD-DRI program. It was found that the motion of the dam foundation interface is non-uniform. There is a time shift and amplification at the abutment compared to those at the base of the dam. The results showed that the spatially varying earthquake assumption is in good agreement with the recorded displacement of the dam.

  10. Verifying Pressure of Water on Dams, a Case Study

    Directory of Open Access Journals (Sweden)

    Temel Bayrak

    2008-09-01

    Full Text Available Sensing and monitoring deformation pattern of dams is often one of the most effective ways to understand their safety status. The main objective of the present study is to find the extent to which rising reservoir level affects the mechanism of deformation of the Yamula dam under certain changes in the reservoir level conditions during the first filling period. A new dynamic deformation analysis technique was developed to analyze four geodetic monitoring records consisting of vertical and horizontal displacements of nine object points established on the dam and six reference points surrounding it, to see whether the rising reservoir level is responsible for the vertical and horizontal deformations during the first filling period. The largest displacements were determined in the middle points of the dam construction. There is an apparent linear relationship between the dam subsidence and the reservoir level. The dynamic deformation model was developed to model this situation. The model infers a causative relationship between the reservoir level and the dam deformations. The analysis of the results determines the degree of the correlation between the change in the reservoir level and the observed structural deformation of the dam.

  11. Detection of water leaks in the dam Joumine and study of sedimentation in the dam Ghezela by nuclear method

    International Nuclear Information System (INIS)

    Sari Souha

    2013-01-01

    The objective of this study is to determinate the paths of leaks observed in the dam Joumine and to identify the origin of salinity in the drain D2. In addition, the evaluation of the sedimentation measurement of suspended elements in the dam Ghezela is our second objective. The Joumine dam located in the North-east of Tunisia (governorate of Bizerte), was built in 1983 has an upstream watershed area of 418 km 2 . The reservoir capacity is 130 Mm 3 . This dam observed a water leakage from its implementation at the two drains D1 and D2 with a emerging flow rate reached a value close to 500 l/s, about 16 pour cent of its capacity. The injection of an insulating material in Karsts networks reduces the leakage rate to a value of 120 l / s in 1993 and 88 l / s in 2013, but this decrease was accompanied by an increase in salinity level in D2. The results from a multidisciplinary approach showed that the leakage path from the left bank of the reservoir where the leak was first detected, heading both D1 and D2 drains and the salinity in drain D2 due to the dissolution of the gypsum layer downstream of the dam and the contribution of brackish water from the left bank. The Ghezela dam located in the same area, was built in 1984 has an upstream watershed area of 48 km 2 . This dam has been an increase in sedimentation of 0.3 million m3 in 1994 to 1.7 million m 3 in 2010. In this study, the suspended elements were measured with a nuclear probe composed by a radioactive source of americium 241 and a NaI detector trained by a boat at different depth in the reservoir.

  12. Pearl Harbor: lessons for the dam safety community

    Energy Technology Data Exchange (ETDEWEB)

    Martin, T.E. [AMEC Earth and Environmental Ltd., Burnaby, BC (Canada)

    2001-10-01

    Every good dam safety program must be based on surveillance and emergency response planning. The same principles apply to the gathering of information for military intelligence and the planning of defence tactics. Lessons learned from failure have spurred the advancement of dam engineering. Dam safety experts can benefit from the inadequacies encountered by the military community, with the most famous occurring on December 7, 1941 in Pearl Harbor. Both intelligence gathering and contingency response planning failed miserably. The data was not properly disseminated, interpreted, analysed. The proper response to the situation was not initiated. Human error and failure to communicate are the two main reasons that explain the debacle. The inquiries into the tragedy at Pearl Harbor provided valuable lessons, related to individual and organizational failures, which the authors shared in this presentation. The relevance to dam safety was made. All Federal Bureau of Investigation (FBI) agents must read the lessons drawn from Pearl Harbor, as they have responsibility for dam safety. 4 refs.

  13. Annual progress report FY 1977

    International Nuclear Information System (INIS)

    Hansen, K.F.; Henry, A.F.

    1977-07-01

    Progress is summarized in a project directed toward development of numerical methods suitable for the computer solution of problems in reactor dynamics and safety. Specific areas of research include methods of integration of the time-dependent diffusion equations by finite difference and finite element methods; representation of reactor properties by various homogenization procedures; application of synthesis methods; and development of response matrix techniques

  14. Towards a dams safety management system for Angola

    OpenAIRE

    Camilo, V.; Silva, A.; Costa, R.; Barateiro, J.; Portela, E. A.; Fonseca, J.

    2015-01-01

    Dams have contributed to the human development and have brought many benefits, such as delivering hydropower, irrigating agricultural fields, supplying drinking water, or just for navigational and recreational purposes. Nevertheless, dams are critical structures that raise multiple concerns and risks associated with the ecological, social and economic impact. Angola has a rich and complex network of water basins and dams that serves different strategic purposes as defined in it...

  15. Remote Sensing of Deformation of a High Concrete-Faced Rockfill Dam Using InSAR: A Study of the Shuibuya Dam, China

    Directory of Open Access Journals (Sweden)

    Wei Zhou

    2016-03-01

    Full Text Available Settlement is one of the most important deformation characteristics of high concrete faced rockfill dams (CFRDs, >100 m. High CFRDs safety would pose a great threat to the security of people’s lives and property downstream if this kind of deformation were not to be measured correctly, as traditional monitoring approaches have limitations in terms of durability, coverage, and efficiency. It has become urgent to develop new monitoring techniques to complement or replace traditional monitoring approaches for monitoring the safety and operation status of high CFRDs. This study examines the Shuibuya Dam (up to 233.5 m in height in China, which is currently the highest CFRD in the world. We used space-borne Interferometric Synthetic Aperture Radar (InSAR time series to monitor the surface deformation of the Shuibuya Dam. Twenty-one ALOS PALSAR images that span the period from 28 February 2007 to 11 March 2011 were used to map the spatial and temporal deformation of the dam. A high correlation of 0.93 between the InSAR and the in-situ monitoring results confirmed the reliability of the InSAR method; the deformation history derived from InSAR is also consistent with the in-situ settlement monitoring system. In addition, the InSAR results allow continuous investigation of dam deformation over a wide area that includes the entire dam surface as well as the surrounding area, offering a clear picture continuously of the dam deformation.

  16. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    Science.gov (United States)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    In the literature, there is information regarding the first deformation and displacement measurements in dams that were conducted in 1920s Switzerland. Todays, deformation measurements in the dams have gained very different functions with improvements in both measurement equipment and evaluation of measurements. Deformation measurements and analysis are among the main topics studied by scientists who take interest in the engineering measurement sciences. The Working group of Deformation Measurements and Analysis, which was established under the International Federation of Surveyors (FIG), carries out its studies and activities with regard to this subject. At the end of the 1970s, the subject of the determination of fixed points in the deformation monitoring network was one of the main subjects extensively studied. Many theories arose from this inquiry, as different institutes came to differing conclusions. In 1978, a special commission with representatives of universities has been established within the FIG 6.1 working group; this commission worked on the issue of determining a general approach to geometric deformation analysis. The results gleaned from the commission were discussed at symposiums organized by the FIG. In accordance with these studies, scientists interested in the subject have begun to work on models that investigate cause and effect relations between the effects that cause deformation and deformation. As of the scientist who interest with the issue focused on different deformation methods, another special commission was established within the FIG engineering measurements commission in order to classify deformation models and study terminology. After studying this material for a long time, the official commission report was published in 2001. In this prepared report, studies have been carried out by considering the FIG Engineering Surveying Commission's report entitled, 'MODELS AND TERMINOLOGY FOR THE ANALYSIS OF GEODETIC MONITORING OBSERVATIONS

  17. National Program for Inspection of Non-Federal Dams. Miller Pond Dam (CT 00154), Thames River Basin, Waterford, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1980-08-01

    Road and adjacent to the Brook are likely to be impacted by dam failure. Because a breach of Miller Pond Dam would cause severe economic loss and the...TO THE ASSUMED SPILL CREST ELEVATION 3 WATER %. WACE ELEATCRS. SHOREI I NE AND 7AI NGTER COGRATIONS ARE APPROXIMATE, AS OBTAINED Dl"F I -t DAM INSECTION

  18. Research in theoretical elementary particle physics at the University of Florida: Task A. Annual progress report

    International Nuclear Information System (INIS)

    Field, R.D.; Ramond, P.M.; Sikivie, P.; Thorn, C.B.

    1994-01-01

    This is the Annual Progress Report of the theoretical particle theory group at the University of Florida under DOE Grant DE-FG05-86ER40272. At present our group consists of four Full Professors (Field, Ramond, Thorn, Sikivie), one Associate Professor (Woodard), and two Assistant Professors (Qiu, Kennedy). In addition, we have four postdoctoral research associates and seven graduate students. The research of our group covers a broad range of topics in theoretical high energy physics including both theory and phenomenology. Included in this report is a summary of the last several years, an outline of our current research program

  19. Seismic Analysis of Concrete Dam by Using Finite Element Method

    Directory of Open Access Journals (Sweden)

    Rozaina Ismail

    2017-01-01

    Full Text Available This paper reports a brief study on linear seismic analysis of Sg. Kinta Concrete Dam. The analysis was conducted in order to determine the performance and behaviour of the dam under seismic excitation. The dam was modelled as two-dimensional and developed based on the design drawing that is obtained from Angkasa Consulting Services Sdn. Bhd. The seismic analysis of the dam is conducted using finite element analysis software package LUSAS 14.3 and the dam has been analyse as a plain stress problem with a linear consideration. A set of historic data, with E1 Centro earthquake acceleration of about 0.50g is used as an earthquake excitation. The natural frequency and mode shape up to fifth mode of the dam has been obtained from the analysis to show the differences of the stress and deformation between each mode. The maximum horizontal and vertical stress of Sg. Kinta dam was found and the distribution of them was discussed in form of contours. The deformation of the dam were also been discussed by comparing the maximum displacement for each mode shaped.

  20. Alteration of stream temperature by natural and artificial beaver dams.

    Science.gov (United States)

    Weber, Nicholas; Bouwes, Nicolaas; Pollock, Michael M; Volk, Carol; Wheaton, Joseph M; Wathen, Gus; Wirtz, Jacob; Jordan, Chris E

    2017-01-01

    Beaver are an integral component of hydrologic, geomorphic, and biotic processes within North American stream systems, and their propensity to build dams alters stream and riparian structure and function to the benefit of many aquatic and terrestrial species. Recognizing this, beaver relocation efforts and/or application of structures designed to mimic the function of beaver dams are increasingly being utilized as effective and cost-efficient stream and riparian restoration approaches. Despite these verities, the notion that beaver dams negatively impact stream habitat remains common, specifically the assumption that beaver dams increase stream temperatures during summer to the detriment of sensitive biota such as salmonids. In this study, we tracked beaver dam distributions and monitored water temperature throughout 34 km of stream for an eight-year period between 2007 and 2014. During this time the number of natural beaver dams within the study area increased by an order of magnitude, and an additional 4 km of stream were subject to a restoration manipulation that included installing a high-density of Beaver Dam Analog (BDA) structures designed to mimic the function of natural beaver dams. Our observations reveal several mechanisms by which beaver dam development may influence stream temperature regimes; including longitudinal buffering of diel summer temperature extrema at the reach scale due to increased surface water storage, and creation of cool-water channel scale temperature refugia through enhanced groundwater-surface water connectivity. Our results suggest that creation of natural and/or artificial beaver dams could be used to mitigate the impact of human induced thermal degradation that may threaten sensitive species.

  1. National Program for Inspection of Non-Federal Dams. Tihonet Pond Number 2 Dam (MA 00030), Massachusetts Coastal Basin, Wareham, Massachusetts. Phase I Inspection Report.

    Science.gov (United States)

    1981-07-01

    drainage area above the dam is 8.1 square miles. The watershed is characterized by irregular topography: cranberry bogs, small ponds and depressions ...and recreational purposes. Water from this pond is used in the U irrigation of cranberry bogs downstream. The maximum storage capacity of the dam is...295-1000 g. PURPOSE OF DAM The dam impounds Tihonet Pond which is a storage reservoir 4_- 4 4: . * used principally for irrigating cranberry bogs which

  2. National Program for Inspection of Non-Federal Dams. Paper Mill Pond Dam (CT 00621), Connecticut River Basin, Vernon, Connecticut. Phase I Inspection Report.

    Science.gov (United States)

    1981-03-01

    HYDROLOGIC AND HYDRAULIC COMPUTATIONS E INFORMATION AS CONTAINED IN THE NATIONAL INVENTORY OF DAMS ,v ’walL.it, AM I OVERVIEV \\ PHOTO Iv 390 L-( ibb~ ~5~4 N...AS-A144 539 NATIONAL PROGRAM FOR INSPEGTION 0F NON-FEDERAL DAMS / PAPER MIL POND DAM (.(U CORPS OF ENGINEERS WALTHAM A S MA NEW ENGLANA DIV MAR...CATALOG NUMBER CT 00621A 4 TITLE (amdSubtile) S. TYPE OF REPORT & PERIOD’COVERED Paper Mill Pond Dam INSPECTION REPORT NATIONAL PROGRAM FOR INSPECTION

  3. Annual Program Progress Report under DOE/PHRI Cooperative Agreement: (July 1, 2001-June 30, 2002)

    Energy Technology Data Exchange (ETDEWEB)

    Palafox, Neal A., MD, MPH

    2002-07-31

    OAK B188 DOE/PHRI Special Medical Care Program in the Republic of the Marshall Islands (RMI)Annual Program Progress Report. The DOE Marshall Islands Medical Program continued, in this it's 48th year, to provide medical surveillance for the exposed population from Rongelap and Utrik and the additional DOE patients. The program was inaugurated in 1954 by the Atomic Energy Commission following the exposure of Marshallese to fallout from a nuclear test (Castle Bravo) at Bikini Atoll. This year marks the fourth year in which the program has been carried out by PHRI under a cooperative agreement with DOE. The DOERHRI Special Medical Care Program, awarded the cooperative agreement on August 28, 1998, commenced its health care program on January 15, 1999, on Kwajalein and January 22, 1999, on Majuro. This report details the program for the July 1, 2001, through the June 30, 2002, period. The program provides year-round, on-site medical care to the DOE patient population residing in the Republic of the Marshall Islands (RMI) and annual examinations to those patients living in Hawaii and on the Continental U.S.

  4. Hydraulic fracture considerations in oil sand overburden dams

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, R.; Madden, B.; Danku, M. [Syncrude Canada Ltd., Fort McMurray, AB (Canada)

    2008-07-01

    This paper discussed hydraulic fracture potential in the dry-filled temporary dams used in the oil sands industry. Hydraulic fractures can occur when reservoir fluid pressures are greater than the minimum stresses in a dam. Stress and strain conditions are influenced by pore pressures, levels of compaction in adjacent fills as well as by underlying pit floor and abutment conditions. Propagation pressure and crack initiation pressures must also be considered in order to provide improved hydraulic fracture protection to dams. Hydraulic fractures typically result in piping failures. Three cases of hydraulic fracture at oil sands operations in Alberta were presented. The study showed that hydraulic fracture failure modes must be considered in dam designs, particularly when thin compacted lift of dry fill are used to replace wetted clay cores. The risk of hydraulic fractures can be reduced by eliminating in situ bedrock irregularities and abutments. Overpressure heights, abutment sloping, and the sloping of fills above abutments, as well as the dam's width and base conditions must also be considered in relation to potential hydraulic fractures. It was concluded that upstream sand beaches and internal filters can help to prevent hydraulic fractures in dams in compacted control zones. 5 refs., 16 figs.

  5. Characterization of landslide dams in the San Juan province (Argentina)

    Science.gov (United States)

    Penna, Ivanna; Longchamp, Celine; Derron, Marc-Henri; Jaboyedoff, Michel

    2013-04-01

    River blockages caused by landslide deposition are common phenomena in active mountain chains, influencing erosion-sedimentation patterns and acting as primary and secondary hazards. Regional scale analyses regarding their spatial distribution and morphometry allow establishing boundary conditions for their occurrence and stability, and determine differences among regions with different landscape and climatic conditions. Owing to the combination of endogenous and exogenous factors, landslide dams are frequent phenomena in the Andes. In the Argentinean NW and the Patagonian Andes, previous studies showed that stability of landslide dams determined by morphometric parameters generally matched satisfactorily with dam behavior, with some exceptions in which climatic component played an important role in dam longevity. Aiming to expand the knowledge of landslide dams in the Argentinean Andes, in this work we analyzed the stability of rock avalanche dams in the Pampeam flat slab subduction zone. In the study area, mountain dynamics creates suitable conditions for the occurrence of 34 rock avalanches with volumes up to 0.3 km3. They developed in deeply carved valleys (Cordillera) and Inter-thrust valleys (Precordillera). 22 impoundments of rivers resulted from channelized rock avalanches with long runouts (4-10 km) that blocked tributaries rivers, but most of them by rock avalanches that filled the valley bottom, with run up in the opposite slope and limited movement parallel to the valley axis. Most of the dams breached in unknown times, except for the last event that occurred on November 12th 2005. The quantification of morphometric parameters and contributing areas indicates the existence of dams with dimensionless blockage index above 2.75 (stable domain) and below 3.08 (instable domain). The Los Erizos dam in our study area and the Barrancas dam in the Patagonian Andes show that besides morphometric parameters, climatic conditions are decisive. Stable landslide dams

  6. Engineers find climbing techniques work well for dam inspections

    Energy Technology Data Exchange (ETDEWEB)

    O`Shea, M.; Graves, A. [Bureau of Reclamation, Denver, CO (United States)

    1996-10-01

    Climbing techniques adopted by the Bureau of Reclamation to inspect previously inaccessible or difficult to reach features at dams are described. Following the failure of the steel radial-arm gate at Folsom Dam, engineers mounted an effort to reach and inspect the dam`s seven other spillway gates. This close-up examination was performed to: (1) determine the condition of these gates; and (2) gather clues about the failure of the one gate. The access techniques described involved mountaineering techniques, as opposed to high scaling techniques, performed with dynamic and static nylon kermantle ropes.

  7. Responses of riparian reptile communities to damming and urbanization

    Science.gov (United States)

    Hunt, Stephanie D.; Guzy, Jacquelyn C.; Price, Steven J.; Halstead, Brian J.; Eskew, Evan A.; Dorcas, Michael E.

    2013-01-01

    Various anthropogenic pressures, including habitat loss, threaten reptile populations worldwide. Riparian zones are critical habitat for many reptile species, but these habitats are also frequently modified by anthropogenic activities. Our study investigated the effects of two riparian habitat modifications-damming and urbanization-on overall and species-specific reptile occupancy patterns. We used time-constrained search techniques to compile encounter histories for 28 reptile species at 21 different sites along the Broad and Pacolet Rivers of South Carolina. Using a hierarchical Bayesian analysis, we modeled reptile occupancy responses to a site's distance upstream from dam, distance downstream from dam, and percent urban land use. The mean occupancy response by the reptile community indicated that reptile occupancy and species richness were maximized when sites were farther upstream from dams. Species-specific occupancy estimates showed a similar trend of lower occupancy immediately upstream from dams. Although the mean occupancy response of the reptile community was positively related to distance downstream from dams, the occupancy response to distance downstream varied among species. Percent urban land use had little effect on the occupancy response of the reptile community or individual species. Our results indicate that the conditions of impoundments and subsequent degradation of the riparian zones upstream from dams may not provide suitable habitat for a number of reptile species.

  8. 1985. Progress annual report

    International Nuclear Information System (INIS)

    1986-06-01

    Tore Supra construction has been vigorously continued. The whole cryogenic system has been entirely delivered. On TFR priority has been given to electron cyclotron resonance heating; but also neutral heating mechanisms, pellet injection, plasma-wall interaction in the presence of pumped limiter, impurity transport and plasma turbulence have been studied and progress on diagnostics have been made. On Petula, with lower hybrid wave, the numerous results on ion heating, current drive, plasma stability in the presence of non-inductive current and on Tore Supra technical problems are important. At last, theoretical and numerical results are concerned with plasma equilibrium macroscopic evolution of plasma, RF heating, plasma instabilities, magnetic islands, turbulence, transport coefficients and spectroscopy [fr

  9. Analysing the Effects of Forest Cover and Irrigation Farm Dams on Streamflows of Water-Scarce Catchments in South Australia through the SWAT Model

    Directory of Open Access Journals (Sweden)

    Hong Hanh Nguyen

    2017-01-01

    Full Text Available To assist water resource managers with future land use planning efforts, the eco-hydrological model Soil and Water Assessment Tool (SWAT was applied to three catchments in South Australia that experience extreme low flow conditions. Particular land uses and management issues of interest included forest covers, known to affect water yields, and farm dams, known to intercept and change the hydrological dynamics in a catchment. The study achieved a satisfactory daily calibration when irrigation farm dams were incorporated in the model. For the catchment dominated by extreme low flows, a better daily simulation across a range of qualitative and quantitative metrics was gained using the base-flow static threshold optimization technique. Scenario analysis on effects of forest cover indicated an increase of surface flow and a reduction of base-flow when native eucalyptus lands were replaced by pastures and vice versa. A decreasing trend was observed for the overall water yield of catchments with more forest plantation due to the higher evapotranspiration (ET rate and the decline in surface flow. With regards to effects of irrigation farm dams, assessment on a daily time step suggested that a significant volume of water is stored in these systems with the water loss rate highest in June and July. On an annual basis, the model indicated that approximately 13.1% to 22.0% of water has been captured by farm dams for irrigation. However, the scenario analysis revealed that the purposes of use of farm dams rather than their volumetric capacities in the catchment determined the magnitude of effects on streamflows. Water extracted from farm dams for irrigation of orchards and vineyards are more likely to diminish streamflows than other land uses. Outputs from this study suggest that the water use restrictions from farm dams during recent drought periods were an effective tool to minimize impacts on streamflows.

  10. Chemical and biological nonproliferation program. FY99 annual report; ANNUAL

    International Nuclear Information System (INIS)

    NONE

    2000-01-01

    This document is the first of what will become an annual report documenting the progress made by the Chemical and Biological Nonproliferation Program (CBNP). It is intended to be a summary of the program's activities that will be of interest to both policy and technical audiences. This report and the annual CBNP Summer Review Meeting are important vehicles for communication with the broader chemical and biological defense and nonproliferation communities. The Chemical and Biological Nonproliferation Program Strategic Plan is also available and provides additional detail on the program's context and goals. The body of the report consists of an overview of the program's philosophy, goals and recent progress in the major program areas. In addition, an appendix is provided with more detailed project summaries that will be of interest to the technical community

  11. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); Butler, Chris (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA)

    2003-09-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area

  12. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  13. Analytical Solution and Application for One-Dimensional Consolidation of Tailings Dam

    Directory of Open Access Journals (Sweden)

    Hai-ming Liu

    2018-01-01

    Full Text Available The pore water pressure of tailings dam has a very great influence on the stability of tailings dam. Based on the assumption of one-dimensional consolidation and small strain, the partial differential equation of pore water pressure is deduced. The obtained differential equation can be simplified based on the parameters which are constants. According to the characteristics of the tailings dam, the pore water pressure of the tailings dam can be divided into the slope dam segment, dry beach segment, and artificial lake segment. The pore water pressure is obtained through solving the partial differential equation by separation variable method. On this basis, the dissipation and accumulation of pore water pressure of the upstream tailings dam are analyzed. The example of typical tailings is introduced to elaborate the applicability of the analytic solution. What is more, the application of pore water pressure in tailings dam is discussed. The research results have important scientific and engineering application value for the stability of tailings dam.

  14. Annual report 2009-10

    International Nuclear Information System (INIS)

    2009-01-01

    The annual progress for the year 2009-10 for Pakistan Atomic Energy Commission (PAEC) is presented. The progress of various Center and their contribution for the uplift of nuclear programme have been described. The progress report fully explained under various topics as under: Highlights, Nuclear Power, Engineering, Physical Sciences, Biological Sciences, Nuclear Materials, Safety, Quality, Human Resource Development, PAEC General Health Services, Projects / International Collaboratioin and publications. (A.B.)

  15. Geophysics Methods in Electrometric Assessment of Dams

    Energy Technology Data Exchange (ETDEWEB)

    Davydov, V. A., E-mail: davydov-va@yandex.ru; Baidikov, S. V., E-mail: badikek@mail.ru; Gorshkov, V. Yu., E-mail: vitalaa@yandex.ru; Malikov, A. V., E-mail: alex.mal.1986@mail.ru [Russian Academy of Sciences, Geophysical Institute, Ural Branch (Russian Federation)

    2016-07-15

    The safety assessment of hydraulic structures is proposed to be conducted via geoelectric measurements, which are capable of assessing the health of earth dams in their natural bedding without intervention in their structure. Geoelectric measurements are shown as being capable of pinpointing hazardous parts of a dam, including areas of elevated seepage. Applications of such methods are shown for a number of mini-dams in the Sverdlovsk region. Aparameter (effective longitudinal conductivity) that may be used to monitor the safety of hydraulic structures is proposed. Quantitative estimates of this parameter are given in terms of the degree of safely.

  16. National Dam Safety Program. Lakeview Estates Dam (MO 11004), Mississippi - Kaskaskia - St. Louis Basin, Warren County, Missouri. Phase I Inspection Report.

    Science.gov (United States)

    1979-09-01

    ificatiozh Distributon/ Availabilit oe LAKEVIEW ESTATES DAM WARREN COUNTY, MISSOURI MISSOURI INVENTORY NO. 11004 PHASE I INSPECTION REPORT NATIONAL DAM SAFETY...and *impounds less than 1,000 acre-feet of water . Our inspection and evaluation indicates that the spill- way of Lakeview Estates Dam does not meet...not be measured because of high reservoir level, scalloping near the crest and a berm just under the water surface. Limestone riprap in sizes from sand

  17. Influence of Beaver Dams on Channel Complexity, Hydrology, and Temperature Regime in a Mountainous Stream

    Science.gov (United States)

    Majerova, M.; Neilson, B. T.; Schmadel, N. M.; Wheaton, J. M.; Snow, C. J.

    2013-12-01

    Beaver dams and beaver activity affect hydrologic processes, sediment transport, channel complexity and water quality of streams. Beaver ponds, which form behind beaver dams, increase in-channel water storage affecting the timing and volume of flow and resulting in the attenuation and flattening of the hydrograph. Channel complexity also increases the potential for transient storage (both surface and subsurface) and influences stream temperature. Impacts of beaver dams and beaver activity on stream responses are difficult to quantify because responses are dynamic and spatially variable. Few studies have focused on the reach scale temporal influences on stream responses and further research is needed particularly in quantifying the influence of beaver dams and their role in shaping the stream habitat. This study explores the changing hydrology and temperature regime of Curtis Creek, a mountainous stream located in Northern Utah, in a 560 m long reach where groundwater exchanges and temperature differences were observed over a three-year period. We have collected continuous stream discharge, stream temperature data and performed tracer experiments. During the first year, we were able to capture the pre-beaver activity. In the second year, we captured the impacts of some beaver activity with only a few dams built in the reach, while the third year included the effects of an entire active beaver colony. By the end of the study period, a single thread channel had been transformed into a channel with side channels and backwaters at multiple locations therefore increasing channel complexity. The cumulative influence of beaver dams on reach scale discharge resulted in a slightly losing reach that developed into a gaining reach. At the smaller sub-reach scale, both losing to gaining and gaining to losing transformations were observed. Temperature differences showed a warming effect of beaver dams at the reach scale. The reach stream temperature difference increased on

  18. Seismic Fortification Analysis of the Guoduo Gravity Dam in Tibet, China

    Directory of Open Access Journals (Sweden)

    Peng Lin

    2015-01-01

    Full Text Available The primary aim of this research was to analyze the seismic performance of the Guoduo gravity dam. A nonlinear FEM method was implemented to study the deformation, stress, and overall stability of dam under both static and dynamic loading conditions, including both normal and overloading conditions. A dam seismic failure risk control method is proposed based on the cracking mechanism induced by the dynamic load to ensure dam safety and stability. Numerical simulation revealed that (1 under normal static and dynamic loading the symmetry of the displacement distributions is good, showing that the dam abutments and riverbed foundation have good overall stiffness. The stress distribution is a safe one for operation under both normal water loading and seismic loading. (2 Attention should be paid to the reinforcement design of outlets of the diversion dam monoliths, and enhance the capability of sustaining that tensile stress of dam monoliths. (3 The shape of the dam profile has a significant effect on the dynamic response of the dam. (4 By employing the “overload safety factor method,” the overall seismic fortification is as follows: K1=1.5, K2= 2~3, and K3= 3~4.

  19. Annual report on Reactor Safety Research Projects sponsored by the Ministry of Economics and Technology of the Federal Republic of Germany. Reporting period 1999. Progress report

    International Nuclear Information System (INIS)

    2000-01-01

    Within its competence for energy research, the Bundesministerium fuer Wirtschaft und Technologie (BMWi) (Federal Ministry of Economics and Technology) sponsors investigations into the safety of nuclear power plants. The objective of these investigations is to provide fundamental knowledge, procedures and methods to contribute to realistic safety assessments of nuclear installations, to the further development of safety technology and to make use of the potential of innovative safety-related approaches. The Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, by order of the BMWi, continuously issues information on the status of such investigations by publishing semi-annual and annual progress reports within the series of GRS-F-Fortschrittsberichte (GRS-F-Progress Reports). Each progress report represents a compilation of individual reports about the objectives, work performed, results achieved, next steps of the work etc. The individual reports are prepared in a standard form by the research organisations themselves as documentation of their progress in work and are published by the Research Management Division of GRS within the framework of general information on the progress in reactor safety research. The compilation of the reports is classified according to the classification system ''Joint Safety Research Index'' of the CEC (commission of the European communities). The reports are arranged in sequence of their project numbers. (orig.)

  20. Magnetic fusion energy materials technology program annual progress report for period ending June 30, 1977

    International Nuclear Information System (INIS)

    Scott, J.L.

    1977-09-01

    The objectives of the Magnetic Fusion Energy (MFE) Materials Technology Program, which is described in this report, are to continue to solve the materials problems of the Fusion Energy Division of ORNL and to meet needs of the national MFE program, directed by the ERDA Division of Magnetic Fusion Energy (DMFE). This work is a continuation of the program described in previous annual progress reports. The principal areas of work include radiation effects, compatibility studies, materials studies related to the plasma-materials interaction, materials engineering, radiation behavior of superconducting magnet insulation, and mechanical properties of superconducting composites. The level of effort and schedules are consistent with Logic II of the DMFE Program Plan

  1. In the Land of the Dammed: Assessing Governance in Resettlement of Ghana’s Bui Dam Project

    Directory of Open Access Journals (Sweden)

    Kwabena Asiama

    2017-11-01

    Full Text Available Resettlement resulting from dam construction has raised several concerns due to the negative aftermath impacts. In Ghana, the construction of three hydroelectric dams resulted in large-scale resettlements. Given the little experience that Ghana has in resettlements, it is necessary for a robust monitoring structure for resettlements. However, this was not available in the last resettlement undertaken for the Bui Dam Project. This paper aims at developing an assessment framework for monitoring resettlement activities on customary lands from a good governance perspective. Based on four good governance principles, transparency, public participation and inclusiveness, equity and rule of law and accountability, a good governance assessment framework is built and applied to the Bui Dam Project using a case study approach. Data were collected through interviews and focus group discussion with the key actors of the resettlement project. It was first found that the planning stage of the resettlement came out with a robust plan that was to prevent the impoverishment of the affected persons. However, in the implementation of the resettlement, not all good governance principles were adhered to. In conclusion, it was found that by deconstructing the resettlement process with a good governance framework, the problematic areas of the resettlement can be effectively differentiated between the planning and implementation phases.

  2. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Department of Resources — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  3. National Inventory of Dams Coastal California Extract 2010

    Data.gov (United States)

    California Natural Resource Agency — The National Inventory of Dams (NID) is a congressionally authorized database, which documents dams in the U.S. and its territories. The NID was most recently...

  4. Seismic risks at Elsie Lake Main Dam

    International Nuclear Information System (INIS)

    McCammon, N.R.; Momenzadeh, M.; Hawson, H.H.; Nielsen, N.M.

    1991-01-01

    The Elsie Lake dams are located on Vancouver Island in an area of high seismic risk. A safety review in 1986 indicated potential deficiencies in the earthfill main dam with respect to modern earthquake design standards. A detailed field investigation program comprising drilling and penetration tests was carried out and the results used in an assessment of seismic stability. A 0.8 m thick less dense layer in the granular shell of the dam, possibly caused by wet construction conditions, would likely liquefy in a major earthquake but sufficient residual strength would likely remain to prevent catastrophic failure. The dam shell might undergo some distortion, and an assessment was initiated to determine the requirements for reservoir drawdown following an extreme earthquake to ensure the timely lowering of the reservoir for inspection and repair. It was suggested that an adequate evacuation capability would be 25% and 50% drawdown in not more than 30 and 50 days, respectively. 9 refs., 11 figs., 1 tab

  5. The environmental impact of large dams

    International Nuclear Information System (INIS)

    Razvan, E.

    1992-01-01

    The campaigns of conservationist groups against dams are generally based on rather emotional issues. This paper puts the situation in a more rational perspective, by analysing the various claims which tend to be put forward concerning the impacts of large dams, examining the validity of the arguments, looking at ways in which any adverse effects can be mitigated, and presenting the complexity of the problems. (author)

  6. Subseabed disposal program annual report, January-December 1979. Volume II. Appendices (principal investigator progress reports). Part 1 of 2

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1981-04-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume I, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-O; Part 2 contains Appendices P-FF. Separate abstracts have been prepared of each Appendix for inclusion in the Energy Data Base

  7. Subseabed disposal program annual report, January-December 1979. Volume II. Appendices (principal investigator progress reports). Part 2 of 2

    International Nuclear Information System (INIS)

    Talbert, D.M.

    1981-04-01

    Volume II of the sixth annual report describing the progress and evaluating the status of the Subseabed Disposal Program contains the appendices referred to in Volume II, Summary and Status. Because of the length of Volume II, it has been split into two parts for publication purposes. Part 1 contains Appendices A-O; Part 2 contains Appendices P-FF. Separate abstracts have been prepared for each appendix for inclusion in the Energy Data Base

  8. Discussion on the Safety Factors of Slopes Recommended for Small Dams

    Directory of Open Access Journals (Sweden)

    Jan Vrubel

    2017-01-01

    Full Text Available The design and assessment of the slope stability of small embankment dams is usually not carried out using slope stability calculations but rather by the comparison of proposed or existing dam slopes with those recommended by technical standards or guidelines. Practical experience shows that in many cases the slopes of small dams are steeper than those recommended. However, most of such steeper slopes at existing dams do not exhibit any visible signs of instability, defects or sliding. For the dam owner and also for dam stability engineers, the safety of the slope, expressed e.g. via a factor of safety, is crucial. The aim of this study is to evaluate the safety margin provided by recommended slopes. The factor of safety was evaluated for several dam shape and layout variants via the shear strength reduction method using PLAXIS software. The study covers various dam geometries, dam core and shoulder positions and parameter values of utilised soils. Three load cases were considered: one with a steady state seepage condition and two with different reservoir water level drawdown velocities – standard and critical. As numerous older small dams lack a drainage system, variants with and without a toe drain were assessed. Calculated factors of safety were compared with required values specified by national standards and guidelines.

  9. Owyhee River intracanyon lava flows: does the river give a dam?

    Science.gov (United States)

    Ely, Lisa L.; Brossy, Cooper C.; House, P. Kyle; Safran, Elizabeth B.; O'Connor, Jim E.; Champion, Duane E.; Fenton, Cassandra R.; Bondre, Ninad R.; Orem, Caitlin A.; Grant, Gordon E.; Henry, Christopher D.; Turrin, Brent D.

    2013-01-01

    Rivers carved into uplifted plateaus are commonly disrupted by discrete events from the surrounding landscape, such as lava flows or large mass movements. These disruptions are independent of slope, basin area, or channel discharge, and can dominate aspects of valley morphology and channel behavior for many kilometers. We document and assess the effects of one type of disruptive event, lava dams, on river valley morphology and incision rates at a variety of time scales, using examples from the Owyhee River in southeastern Oregon. Six sets of basaltic lava flows entered and dammed the river canyon during two periods in the late Cenozoic ca. 2 Ma–780 ka and 250–70 ka. The dams are strongly asymmetric, with steep, blunt escarpments facing up valley and long, low slopes down valley. None of the dams shows evidence of catastrophic failure; all blocked the river and diverted water over or around the dam crest. The net effect of the dams was therefore to inhibit rather than promote incision. Once incision resumed, most of the intracanyon flows were incised relatively rapidly and therefore did not exert a lasting impact on the river valley profile over time scales >106 yr. The net long-term incision rate from the time of the oldest documented lava dam, the Bogus Rim lava dam (≤1.7 Ma), to present was 0.18 mm/yr, but incision rates through or around individual lava dams were up to an order of magnitude greater. At least three lava dams (Bogus Rim, Saddle Butte, and West Crater) show evidence that incision initiated only after the impounded lakes filled completely with sediment and there was gravel transport across the dams. The most recent lava dam, formed by the West Crater lava flow around 70 ka, persisted for at least 25 k.y. before incision began, and the dam was largely removed within another 35 k.y. The time scale over which the lava dams inhibit incision is therefore directly affected by both the volume of lava forming the dam and the time required for sediment

  10. Some aspects in the legal regulation of the dams

    International Nuclear Information System (INIS)

    Tancev, Ljubomir

    1996-01-01

    In order to ensure high quality and low cost design and building of dams and appurtenant structures, as well as safe exploitation, it is obvious to have appropriate legislation. Keeping in mind that the dams are unique structures, for the design stage the legislation should be less strong. For the next phases - building, maintenance and exploitation - detail and rigorous legislation is recommended. It is emphasised that the engineers should have more freedom designing the dams, but they should be obvious to apply the most recent achievement in the field of the dam design and construction. For illustration, some aspects of three important questions are discussed - 1) the choice of maximum flood discharge, 2) the application of new materials and construction methods and 3) the application of modern methods for static and dynamic analysis of dams. (Author)

  11. Analytical Solution and Application for One-Dimensional Consolidation of Tailings Dam

    OpenAIRE

    Liu, Hai-ming; Nan, Gan; Guo, Wei; Yang, Chun-he; Zhang, Chao

    2018-01-01

    The pore water pressure of tailings dam has a very great influence on the stability of tailings dam. Based on the assumption of one-dimensional consolidation and small strain, the partial differential equation of pore water pressure is deduced. The obtained differential equation can be simplified based on the parameters which are constants. According to the characteristics of the tailings dam, the pore water pressure of the tailings dam can be divided into the slope dam segment, dry beach seg...

  12. 33 CFR 117.705 - Beaver Dam Creek.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Beaver Dam Creek. 117.705 Section 117.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES DRAWBRIDGE OPERATION REGULATIONS Specific Requirements New Jersey § 117.705 Beaver Dam Creek. The draw of the...

  13. Space and habitat use by black bears in the Elwha valley prior to dam removal

    Science.gov (United States)

    Sager-Fradkin, K.A.; Jenkins, K.J.; Happe, P.J.; Beecham, J.J.; Wright, R.G.; Hoffman, R.A.

    2008-01-01

    Dam removal and subsequent restoration of salmon to the Elwha River is expected to cause a shift in nutrient dynamics within the watershed. To document how this influx of nutrients and energy may affect black bear (Ursus americanus) ecology, we used radio-telemetry to record movements of 11 male and two female black bears in the Elwha Valley from 2002-06. Our objective was to collect baseline data on bear movements prior to dam removal. We calculated annual home ranges, described seasonal timing of den entry and emergence, and described seasonal patterns of distribution and habitat use. Adaptive kernel home ranges were larger formales (mean = 151.1 km2, SE = 21.4) than females (mean = 38.8 km2, SE = 13.0). Males ranged widely and frequently left the watershed during late summer. Further, they exhibited predictable and synchronous patterns of elevation change throughout each year. Bears entered their winter dens between 8 October and 15 December and emerged from dens between 10 March and 9 May. Male bears used low-elevation conifer and hardwood forests along the Elwha floodplain during spring, mid- to high-elevation forests and meadows during early summer, high-elevation forests, meadows and shrubs during late summer, and mid-elevation forests, shrubs and meadows during fall. Data acquired during this study provide important baseline information for comparison after dam removal, when bears may alter their late summer and fall movement and denning patterns to take advantage of energy-rich spawning salmon.

  14. Fosfortab fra det dyrkede areal til Stevning Dam, Hindemaj og Haderslev Dam

    DEFF Research Database (Denmark)

    Andersen, Hans Estrup; Heckrath, Goswin; Thodsen, Hans

    Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P-indeks-kortlægni......Størrelsen af dyrkningsbidraget til søerne i Haderslev Dam-systemet er vurderet med to forskellige metoder til at udgøre ca. 42 % af den samlede tilførsel. En risikokortlægning med det nye, danske P-indeks viser, at i alt 15 % af det dyrkede areal er i højrisiko mht. fosfortab. P...

  15. CTR plasma engineering studies. Annual progress report, 1 December 1984-30 November 1985

    International Nuclear Information System (INIS)

    Miley, G.H.

    1985-01-01

    Work under this project is focused on plasma engineering developments in support of fusion reactor studies. The work described in this annual progress report covers a variety of topics ranging from plasma transport modelling for compact tori to radiation heating of the first wall in a fusion device. Sections 2 and 3 decribe computer codes developed for use with field-reversed configurations such as spheromaks and field-reversed mirrors. Section 4 presents an evaluation of the feasibility of heating a RFP-type reactor to ignition with ohmic current input alone. Sections 5 and 6 describe new work that has been initiated on optimal control theory for fusion reactors. Sections 7 to 9 discuss recent results on alpha-particle transport, instabilities, and diagnostics. In the final section, methods for analysis of the poloidal variation in the thermal wall loading of a tokamak reactor are discussed and some typical results are presented

  16. Dam-break studies for mine tailings impoundments

    International Nuclear Information System (INIS)

    Jeyapalan, J.K.

    1982-01-01

    This paper describes simple procedures for performing dam-break analyses. Tailings from dam failures usually liquefy and flow for substantial distances as a viscous fluid. The prediction of the possible extent of flow slide movement is illustrated using two case histories. Topics considered include the flow behavior of liquefied talings, dimensionsless numbers for mine tailings and associated flow regimes, laminar flow, and turbulent flow. The potential inundation regions downstream of mine tailings dams are assessed. It is concluded that instances of flow slides of mine waste embankments indicate that the failure of these structures has considerable potential for damage to life and property in many cases

  17. Dams and river dolphins: Can they co-exist?

    International Nuclear Information System (INIS)

    Reeves, R.R.; Leatherwood, S.

    1994-01-01

    Dam construction is one of many ways that humans have modified river-dolphin habitats. It is suggested that physiographic and hydrologic complexity plays an important role in making rivers suitable for dolphins. If this hypothesis is true, then it can be assumed that dams and other artificial obstructions degrade dolphin habitat insofar as they reduce such complexity. This paper identifies some of the impacts that dams, barrages, and dikes might have on dolphins. Research is needed at project sites, both before and after construction, to document impacts. Specially designed ''swimways'' may allow upstream and downstream passage by dolphins and thus mitigate at least one of the adverse effects of dam projects, namely population fragmentation, but such measures aimed at benefiting single species are no substitute for protecting ecosystems. 30 refs

  18. Dynamic probability evaluation of safety levels of earth-rockfill dams using Bayesian approach

    Directory of Open Access Journals (Sweden)

    Zi-wu Fan

    2009-06-01

    Full Text Available In order to accurately predict and control the aging process of dams, new information should be collected continuously to renew the quantitative evaluation of dam safety levels. Owing to the complex structural characteristics of dams, it is quite difficult to predict the time-varying factors affecting their safety levels. It is not feasible to employ dynamic reliability indices to evaluate the actual safety levels of dams. Based on the relevant regulations for dam safety classification in China, a dynamic probability description of dam safety levels was developed. Using the Bayesian approach and effective information mining, as well as real-time information, this study achieved more rational evaluation and prediction of dam safety levels. With the Bayesian expression of discrete stochastic variables, the a priori probabilities of the dam safety levels determined by experts were combined with the likelihood probability of the real-time check information, and the probability information for the evaluation of dam safety levels was renewed. The probability index was then applied to dam rehabilitation decision-making. This method helps reduce the difficulty and uncertainty of the evaluation of dam safety levels and complies with the current safe decision-making regulations for dams in China. It also enhances the application of current risk analysis methods for dam safety levels.

  19. Mechanism Research of Arch Dam Abutment Forces during Overload

    Directory of Open Access Journals (Sweden)

    Yu Xia

    2015-01-01

    Full Text Available This paper presents research on the abutment forces of a double-curvature arch dam during overload based on numerical calculation results obtained through finite element method by Ansys. Results show that, with an increase in elevation, the abutment forces and bending moment of the arch dam increase first and then decrease from the bottom to the top of the dam. Abutment forces and bending moment reach their maximum at the middle or middle-down portion of the dam. The distributions of abutment forces and moment do not change during overload. The magnitude of each arch layer’s forces and moment increases linearly during overload. This result indicates that each arch layer transmits bearing loads to the rocks of the left and right banks steadily. This research explains the operating mechanism of an arch dam under normal and overload conditions. It provides a simple method to calculate the distribution of forces Fx and Fy and a new method to calculate the overload factor of an arch dam through the estimation of arch layers based on the redistribution characteristic of arch abutment forces.

  20. Determining The Water Quality of Maruf Dam (Boyabat–Sinop

    Directory of Open Access Journals (Sweden)

    Ekrem MUTLU

    2017-06-01

    Full Text Available In this study, the preliminary findings obtained from 3 sampling points, which represent the whole, on Maruf Irrigation Dam, which is located in Boyabat district of Sinop province, for 12 months between September 2015 and August 2016 were examined. The parameters monitored are temperature, dissolved oxygen, pH, electrical conductivity, total hardness, total alkalinity, chemical oxygen demand, biological oxygen demand, and dissolved anions and cations (sodium, potassium, calcium, magnesium, ammonium, nitrate, phosphate, chloride, sulfate, and sulfite. Because of its low dissolved ionic matter content, Maruf Dam was characterized as an alkali dam with mid-hard water and low electrical conductivity. In terms of parameters A and B of Surface Water Quality Management Regulation, the dam is considered “high-quality” and “unpolluted”. Besides the irrigation purposes, for which the barrage was constructed, the dam can also be used for aquaculture, animal breeding, and farming needs.

  1. MNR's role in public safety around dams

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, Jennifer [Ministry of Natural Resources, Peterborough, ON (Canada)

    2011-07-01

    The Ministry of Natural Resources (MNR) is the largest dam owner in Ontario with around 400 dams located all across the province. MNR works to exercise stewardship of Ontario's water resources in a context of public safety, employee safety and environmental awarenes. This presentation shows the different measures MNR implemented to reduce risks. Warning signs, safety booms, barrel buoys and pedestrian fencing have been installed around dams to alert the public to possible dangers. In addition, MNR employees receive training in how to inspect dams for safety concerns, how to identify problems which could result in hazards to the public and how to work safely.

  2. Detection of Water Leaks in Beni-Haroun Dam (Algeria)

    International Nuclear Information System (INIS)

    Hocini, N.; Mami, M.

    2011-01-01

    The main objective of this work was to detect water leakage origin combining conventional, tracing and isotope techniques. The investigation was performed by a research team from the 'Algiers Nuclear Research Centre' in collaboration with engineers from the 'National Agency for Dams'. The chemical and isotopic results have shown no influence of dam water on the water sampled at the piezometers and drains that are present in the close neighbourhood of the dam. However, the water flowing at drain D15 has exhibited the nearest quality to that dam. Dye tracing has shown a water circulation through complex pathways for the left bank. (author)

  3. Inventory of Dams in the State of Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Permitted dams in Iowa and associated attributes, as recorded by the Floodplain Section of the DNR. The dams regulated are those with the parameters listed below: a....

  4. User's Guide: Arch Dam Stress Analysis System (ADSAS)

    National Research Council Canada - National Science Library

    1997-01-01

    .... ADSAS assumes linear elastic behavior for the entire dam, i.e. the dam is assumed to support the computed tensile stresses within the concrete mass and across the monolith joints without cracking or opening the joints...

  5. 1983. Annual progress report

    International Nuclear Information System (INIS)

    1984-01-01

    A beautiful experiment series for studying high energy excitation structures (10 to 80 MeV), concerning very heavy and asymmetric systems. CEV-Alice contributions to annual report concern Hg and Er high spin energy levels. About reaction mechanisms, the following contributions can be noticed: proton backward emission experiment results of high energy, at 200 MeV, on numerous targets; spectroscopic studies of direct transfer reactions by 18 O with measurement of angular distributions until 0 0 ; many heavy ion experiments around 30 MeV/u concerning the mechanism evolution between 10 and 100 MeV. Pion coherent production experiments have been made this year on energy dependence of the reaction 3 He+ 3 He → 6 Li+π + , considered as an existing model test. Cross section measurement of the elementary reactions (p,π + ) on three targets of very different masses, in a large energy scale and a wide angular domain, have been measured at the Synchrocyclotron. Concerning the nuclear structure in low and medium energy levels, elastic scattering and transfer studies are to be noticed particularly in transition nuclei region. Exotic nuclei rich in neutrons, with medium mass, Fe, Co, Ni, Zn have been studied using the 14 C beam of the Orsay tandem. The radiochemistry group work is essentially centered on actinides study [fr

  6. River system recovery following the Novat-Rosu tailings dam failure, Maramures County, Romania

    International Nuclear Information System (INIS)

    Bird, Graham; Brewer, Paul A.; Macklin, Mark G.; Balteanu, Dan; Serban, Mihaela; Driga, Basarab; Zaharia, Sorin

    2008-01-01

    The River Viseu catchment in Maramures County, northwestern Romania, has a long history of base and precious metal mining. Between 1994 and 2003 waste from mining activity at Baia Borsa was stored in the Novat-Rosu tailings pond in the upper Viseu catchment. However, in March 2000, the tailings dam failed releasing approximately 100,000 m 3 of contaminated water and 20,000 t of mineral-rich solid waste, which was routed downstream through the Rivers Novat, Vaser and Viseu into the River Tisa. Following the accident metal (Cd, Cu, Pb, Zn) concentrations in river water and river channel sediment were assessed in samples collected annually (July 2000, 2001, 2002 and 2003) from 29 sites in the Viseu catchment, downstream of the tailings pond. Additionally, the speciation of sediment-associated metals was established using a 4-stage sequential extraction procedure (SEP) and Pb isotope analysis ( 206/204 Pb and 207/204 Pb) was carried out to establish the provenance of contaminated sediments. Metal concentrations in river water were found to comply with EU directive 'target' values within four months of the failure. However, the impact of the spill upon river channel sediments was found to be much longer-lasting, with evidence of the delayed downstream remobilization of tailings stored within the narrow Novat valley following the dam failure, as well as continued inputs of contaminated sediment to the River Viseu from the River Tisla, another mining-affected tributary. Comparison with data from other recent tailings dam failures, indicates that river system recovery rates depend upon local geomorphological conditions, hydrological regimes, and the nature and scale of post-spill clean-up operations

  7. Dam safety review using non-destructive methods for reinforced concrete structure

    Energy Technology Data Exchange (ETDEWEB)

    Philibert, Alain; Saint-Pierre, Francois; Turcotte, Bernard [Le Groupe S.M. International Inc., Sherbrooke, (Canada)

    2010-07-01

    Dams built at the beginning of the twentieth century include concrete structures that were put in under rehabilitation works. In some cases, the details of the structures are not well documented. In other cases, concrete damage can be hidden under new layers of undamaged material. This requires that the dam safety review in a real investigation gather the information necessary for carrying out the hydraulic and stability studies required by the Dam Safety Act. This paper presented the process of dam safety review using non-destructive methods for reinforced concrete structures. Two reinforced concrete dams built in the 1900's, the Eustic dam on the Coaticook River and the Frontenac dam on the Magog River near Sherbrooke, were evaluated by S.M. International using non-destructive methods such as sonic and ground penetrating radar methods. The studies allowed mapping of concrete damage and provided geometric information on some non visible structure elements that were part of previous reinforcement operations.

  8. How to manage the cumulative flood safety of catchment dams ...

    African Journals Online (AJOL)

    Dam safety is a significant issue being taken seriously worldwide. However, in Australia, although much attention is being devoted to the medium- to large-scale dams, minimal attention is being paid to the serious potential problems associated with smaller dams, particularly the potential cumulative safety threats they pose ...

  9. Priority ranking for maintenance activities on embankment dams

    International Nuclear Information System (INIS)

    Chouinard, L.E.; Andersen, G.R.; Robichaud, J.G.; Blanchette, G.; Gervais, R.

    1998-01-01

    Operators of dams in Canada and the U.S. are steadily shifting from construction of new facilities to the maintenance and repairs of existing ones. This paper emphasized the importance of prioritizing maintenance activities on embankment dams whose maintenance needs vary from structure to structure. Two parallel procedures were developed, one for monitoring devices and the other for defense groups. Both procedures are intended to be used together to rate the condition of the embankment dams. The term 'defense groups' is used to refer to the collection of physical components on dams to prevent adverse conditions from occurring that would result in an uncontrolled release of the reservoir. The priority rankings and condition indices developed by means of this procedure reflects the judgment of a panel of engineers and geologists who implement them. They are not to be interpreted as an index of dam safety. While the process is sufficiently well developed to warrant wide-spread distribution, it is considered to be still in the developmental stage. Therefore, it should be used in conjunction with other parallel processes evaluating structural, mechanical and electrical features of the structure under consideration. 6 refs., 7 tabs

  10. Cleveland Dam East Abutment : seepage control project

    Energy Technology Data Exchange (ETDEWEB)

    Huber, F.; Siu, D. [Greater Vancouver Regional District, Burnaby, BC (Canada); Ahlfield, S.; Singh, N. [Klohn Crippen Consultants Ltd., Vancouver, BC (Canada)

    2004-09-01

    North Vancouver's 91 meter high Cleveland Dam was built in the 1950s in a deep bedrock canyon to provide a reservoir for potable water to 18 municipalities. Flow in the concrete gravity dam is controlled by a gated spillway, 2 mid-level outlets and intakes and 2 low-level outlets. This paper describes the seepage control measures that were taken at the time of construction as well as the additional measures that were taken post construction to control piezometric levels, seepage and piping and slope instability in the East Abutment. At the time of construction, a till blanket was used to cover the upstream reservoir slope for 200 meters upstream of the dam. A single line grout curtain was used through the overburden from ground surface to bedrock for a distance of 166 meters from the dam to the East Abutment. Since construction, the safety of the dam has been compromised through changes in piezometric pressure, seepage and soil loss. Klohn Crippen Consultants designed a unique seepage control measure to address the instability risk. The project involved excavating 300,000 cubic meters of soil to form a stable slope and construction bench. A vertical wall was constructed to block seepage. The existing seepage control blanket was also extended by 260 meters. The social, environmental and technical issues that were encountered during the rehabilitation project are also discussed. The blanket extension construction has met design requirements and the abutment materials that are most susceptible to internal erosion have been covered by non-erodible blanket materials such as plastic and roller-compacted concrete (RCC). The project was completed on schedule and within budget and has greatly improved the long-term stability of the dam and public safety. 2 refs., 8 figs.

  11. Clinical Investigation Program Annual Progress Report

    Science.gov (United States)

    1989-10-01

    Meeting, Washington DC, September 1989 Parsons MK: Acute Shift of Right Ventricular Distensibility After Balloon Pulmonary Vavuloplasty. American Heart...selected range of motion using both concentric and eccentric muscular contractions. PROGRESS: No. of Subjects Enrolled - To Date: 8 Reporting Period: 8 1

  12. Descriptive characteristics of the large Italian dams

    International Nuclear Information System (INIS)

    Dello Vicario, E.; Petaccia, A.; Savanella, V.

    1999-01-01

    In the present note the characteristics of the Italian dams are examined, underlining, in a statistical view, story, geographical location, types and use of the most important works. Such a review can be useful for a more detailed analysis, both for the dams characterization and for further studies relevant to water resources utilization [it

  13. Primary Productivity of the Cengklik Dam Boyolali

    Directory of Open Access Journals (Sweden)

    WIRYANTO

    2002-01-01

    Full Text Available Primary productivity dynamic of the water ecosystem was conducted faster in the last decades. This study was intended to find out the primary productivity of Cengklik dam Boyolali, Central Java to explain the ecosystem dynamic and to lead the maintenance of dam. This study used quantitative methods in completely randomized group design (CRD, and the data was analized by Analysis of Variance (ANAVA. Samples were taken horizontally in four sampling point, respectively in the riparian zone, around of the floating net (“karamba”, in the center of dam water and around of the ex-paddy fields. There were taken vertically in three-depth point in each of the sampling point, respectively 0.5 meter, 1.5 meter, and 2.5 meter. The results showed that the gross primary productivity of the dam was 11.122.500-22.545.600 mgC/m3/days, and the primary productivity differences in each of the point sampling caused by light intensity, nutrient supply, and abundance of the chlorophyll organisms.

  14. Management of agro-pastoral dams in Benin: stakeholders, institutions and rehabilitation research

    NARCIS (Netherlands)

    Kpéra, G.N.; Aarts, N.; Saïdou, A.; Tossou, R.C.; Eilers, C.H.A.M.; Mensah, G.A.; Sinsin, B.A.; Kossou, D.K.; van der Zijpp, A.J.

    2012-01-01

    Agro-pastoral dams are waterholes constructed to provide water for livestock and for agricultural development. In Benin, agro-pastoral dams are managed by dam management committees. This study seeks to (1) characterize the stakeholders involved in agro-pastoral dam use and management, (2) identify

  15. Fragmentation of Andes-to-Amazon connectivity by hydropower dams.

    Science.gov (United States)

    Anderson, Elizabeth P; Jenkins, Clinton N; Heilpern, Sebastian; Maldonado-Ocampo, Javier A; Carvajal-Vallejos, Fernando M; Encalada, Andrea C; Rivadeneira, Juan Francisco; Hidalgo, Max; Cañas, Carlos M; Ortega, Hernan; Salcedo, Norma; Maldonado, Mabel; Tedesco, Pablo A

    2018-01-01

    Andes-to-Amazon river connectivity controls numerous natural and human systems in the greater Amazon. However, it is being rapidly altered by a wave of new hydropower development, the impacts of which have been previously underestimated. We document 142 dams existing or under construction and 160 proposed dams for rivers draining the Andean headwaters of the Amazon. Existing dams have fragmented the tributary networks of six of eight major Andean Amazon river basins. Proposed dams could result in significant losses in river connectivity in river mainstems of five of eight major systems-the Napo, Marañón, Ucayali, Beni, and Mamoré. With a newly reported 671 freshwater fish species inhabiting the Andean headwaters of the Amazon (>500 m), dams threaten previously unrecognized biodiversity, particularly among endemic and migratory species. Because Andean rivers contribute most of the sediment in the mainstem Amazon, losses in river connectivity translate to drastic alteration of river channel and floodplain geomorphology and associated ecosystem services.

  16. Spokane Tribal Hatchery, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2005-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Fish produced by this project in 2004 to meet collective fish production and release goals included: 1,655,722 kokanee fingerlings, 537,783 rainbow trout fingerlings and 507,660 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to have a negative impact on adult kokanee returns and limits the

  17. Assessing the combined effect of dams and climate warming on streamflow in California's Sierra Nevada for regional-scale adaptation

    Science.gov (United States)

    Rheinheimer, D. E.; Viers, J. H.

    2012-12-01

    Dams and their operations harm river ecosystems, in part by altering the natural flow regimes that those ecosystems depend on. In the multi-reservoir water management systems of California's Sierra Nevada, greater emphasis is being placed on re-operating existing reservoir systems to recover downstream ecosystems. However, climate change is changing inflow patterns, affecting both ecosystems and traditional water system benefits across the region. As new reservoir operation schemes will be needed to manage for natural resources management objectives at the regional scale, characterizing historical and future environmental impacts of current operations across the region can aid in prioritizing planning efforts. We used a coarse-scale water resources simulation model developed for the western Sierra Nevada to explore the independent and combined effects of dams and climate warming on the flow regime directly below reservoirs, the focal point for instream flow requirements in operations licenses. We quantified changes to mean annual flow, annual low flow duration, annual runoff centroid timing, and weekly rate of decrease under binary combinations of management (unregulated/regulated) and climate (historical/future) conditions. We demonstrate that although rivers in the Sierra Nevada are currently managed in ways that are harmful to instream ecosystems, and that streamflow effects of operations are typically much worse than climate change effects, there are signals that reservoirs can potentially be used to help adapt to some of climate changes harmful effects with little additional effort in some cases. This study is the first step toward a better understanding of the environmental costs from and opportunities afforded by the current stock of reservoirs in a large hydroregion under changing social and environmental conditions.

  18. SCENARIO OF AN ACCIDENT OF SOIL DAMS IN CASE OF WATER SPILL OVER A DAM CREST BY USING FAULT TREE ANALYSIS

    Directory of Open Access Journals (Sweden)

    Kuznetsov Dmitriy Viktorovich

    2016-04-01

    Full Text Available The scenario of a hydrodynamic accident of water flow over a crest of a soil dam is considered by the method of fault tree analysis, for which the basic reasons and controlled diagnostic indicators of an accident have been defined. Logical operators “AND”/”OR” were used for creation of a sequence of logically connected events, leading to an undesired event in the scenario of accident. The scenario of the accident was plotted in case of three basic reasons - an excessive settling of a dam crest, an excess flood, an inoperable spillway, taking into account the sequence of the events’ development and with observance of the necessary conditions leading to an accident. “Technical” reasons were observed in the present scenario, force majeure events were not considered. The provided scenario of the accident consists of two branches of events’ development: the left one that depends on an upstream level, and the right one that depends on settling of a dam crest. In each of the considered events an accident “the water spill over a crest of a soil dam” is possible only in case of execution of two different conditions at the same time, i.e. in case of an appropriate upstream level and the appropriate mark of a crest of a soil dam. The conditions of the accident are defined by diagnostic indices - the upstream level and settling of a dam crest, which at the same time are safety criteria of the hydraulic structure for soil dams. They allow defining the technical condition of the construction. Four possible technical conditions are suggested for the definition of technical statuses - normative, operable, limited operable, abnormal. Criteria of safety are the boundaries of the state: for loading and impact - it is the upstream level, for geometrical compliance of the construction - it is a dam crest mark.

  19. Dams on Mekong tributaries as significant contributors of hydrological alterations to the Tonle Sap Floodplain in Cambodia

    Science.gov (United States)

    Arias, M. E.; Piman, T.; Lauri, H.; Cochrane, T. A.; Kummu, M.

    2014-12-01

    River tributaries have a key role in the biophysical functioning of the Mekong Basin. Of particular interest are the Sesan, Srepok, and Sekong (3S) rivers, which contribute nearly a quarter of the total Mekong discharge. Forty two dams are proposed in the 3S, and once completed they will exceed the active storage of China's large dam cascade in the Upper Mekong. Given their proximity to the Lower Mekong floodplains, the 3S dams could alter the flood-pulse hydrology driving the productivity of downstream ecosystems. Therefore, the main objective of this study was to quantify how hydropower development in the 3S, together with definite future (DF) plans for infrastructure development through the basin, would alter the hydrology of the Tonle Sap's Floodplain, the largest wetland in the Mekong and home to one of the most productive inland fisheries in the world. We coupled results from four numerical models representing the basin's surface hydrology, water resources development, and floodplain hydrodynamics. The scale of alterations caused by hydropower in the 3S was compared with the basin's DF scenario driven by the Upper Mekong dam cascade. The DF or the 3S development scenarios could independently increase Tonle Sap's 30-day minimum water levels by 30 ± 5 cm and decrease annual water level fall rates by 0.30 ± 0.05 cm day-1. When analyzed together (DF + 3S), these scenarios are likely to eliminate all baseline conditions (1986-2000) of extreme low water levels, a particularly important component of Tonle Sap's environmental flows. Given the ongoing trends and large economic incentives in the hydropower business in the region, there is a high possibility that most of the 3S hydropower potential will be exploited and that dams will be built even in locations where there is a high risk of ecological disruption. Hence, retrofitting current designs and operations to promote sustainable hydropower practices that optimize multiple river services - rather than just

  20. National Dam Safety Program. Clove Lake Dam (NJ 00259) Delaware River Basin, Shimers Brook, Sussex County, New Jersey. Phase I Inspection Report.

    Science.gov (United States)

    1981-08-01

    it be reclassified as low hazard. The spillway will pass the 100-year flood and is considered adequate. e. Ownership. The dam is owned by Clubhouse ...Associates. For information, contact Mr. Gerald Roby, Clubhouse Associates, RD 4, Box 108, Montague, New Jersey 07827. f. Purpose. The Clove Lake Dam...into what appears to be a man-made lake downstream of Clove Lake Dam about 0.5 mile. Although no homes are presently constructed around this downstream

  1. Variability of streambed hydraulic conductivity in an intermittent stream reach regulated by Vented Dams: A case study

    Science.gov (United States)

    Naganna, Sujay Raghavendra; Deka, Paresh Chandra

    2018-07-01

    The hydro-geological properties of streambed together with the hydraulic gradients determine the fluxes of water, energy and solutes between the stream and underlying aquifer system. Dam induced sedimentation affects hyporheic processes and alters substrate pore space geometries in the course of progressive stabilization of the sediment layers. Uncertainty in stream-aquifer interactions arises from the inherent complex-nested flow paths and spatio-temporal variability of streambed hydraulic properties. A detailed field investigation of streambed hydraulic conductivity (Ks) using Guelph Permeameter was carried out in an intermittent stream reach of the Pavanje river basin located in the mountainous, forested tract of western ghats of India. The present study reports the spatial and temporal variability of streambed hydraulic conductivity along the stream reach obstructed by two Vented Dams in sequence. Statistical tests such as Levene's and Welch's t-tests were employed to check for various variability measures. The strength of spatial dependence and the presence of spatial autocorrelation among the streambed Ks samples were tested by using Moran's I statistic. The measures of central tendency and dispersion pointed out reasonable spatial variability in Ks distribution throughout the study reach during two consecutive years 2016 and 2017. The streambed was heterogeneous with regard to hydraulic conductivity distribution with high-Ks zones near the backwater areas of the vented dam and low-Ks zones particularly at the tail water section of vented dams. Dam operational strategies were responsible for seasonal fluctuations in sedimentation and modifications to streambed substrate characteristics (such as porosity, grain size, packing etc.), resulting in heterogeneous streambed Ks profiles. The channel downstream of vented dams contained significantly more cohesive deposits of fine sediment due to the overflow of surplus suspended sediment-laden water at low velocity

  2. Incremental Dynamic Analysis of Koyna Dam under Repeated Ground Motions

    Science.gov (United States)

    Zainab Nik Azizan, Nik; Majid, Taksiah A.; Nazri, Fadzli Mohamed; Maity, Damodar; Abdullah, Junaidah

    2018-03-01

    This paper discovers the incremental dynamic analysis (IDA) of concrete gravity dam under single and repeated earthquake loadings to identify the limit state of the dam. Seven ground motions with horizontal and vertical direction as seismic input considered in the nonlinear dynamic analysis based on the real repeated earthquake in the worldwide. All the ground motions convert to respond spectrum and scaled according to the developed elastic respond spectrum in order to match the characteristic of the ground motion to the soil type. The scaled was depends on the fundamental period, T1 of the dam. The Koyna dam has been selected as a case study for the purpose of the analysis by assuming that no sliding and rigid foundation, has been estimated. IDA curves for Koyna dam developed for single and repeated ground motions and the performance level of the dam identifies. The IDA curve of repeated ground motion shown stiffer rather than single ground motion. The ultimate state displacement for a single event is 45.59mm and decreased to 39.33mm under repeated events which are decreased about 14%. This showed that the performance level of the dam based on seismic loadings depend on ground motion pattern.

  3. CTR plasma engineering studies. Annual progress report, 1 December 1985-30 November 1986

    International Nuclear Information System (INIS)

    Miley, G.H.

    1986-01-01

    The work described in this annual progress report covers a variety of topics ranging from alpha instabilities and current drive techniques to radiation heating of the first wall in a fusion device. Section II discusses work carried out on alpha instabilities, including comments on problems anticipated in the proposed compact ignition experiment and also recent studies of effects in tandem mirrors. Sections III and IV describe our recent efforts on RFP modelling. This includes a detailed study of oscillating field current drive (F-Θ) pumping and also parametric studies of ignition requirements. Section V presents a report of our application of control theory techniques to the stabilization of an elongated tokamak (ET) using feedback control of the plasma elongation. Section VI discusses our most recent study of the first-wall thermal response to plasma energy deposition while Section VII reviews our continuing study of techniques to radiation harden a wall detector for measuring alpha distributions in a burning plasma

  4. Bed Degradation and Sediment Export from the Missouri River after Dam Construction and River Training: Significance to Lower Mississippi River Sediment Loads

    Science.gov (United States)

    Blum, M. D.; Viparelli, E.; Sulaiman, Z. A.; Pettit, B. S.

    2016-12-01

    More than 40,000 dams have been constructed in the Mississippi River drainage basin, which has had a dramatic impact on suspended sediment load for the Mississippi delta. The most significant dams were constructed in the 1950s on the Missouri River in South Dakota, after which total suspended loads for the lower Mississippi River, some 2500 km downstream, were cut in half: gauging station data from the Missouri-Mississippi system show significant load reductions immediately after dam closure, followed by a continued downward trend since that time. The delta region is experiencing tremendous land loss in response to acceleration of global sea-level rise, and load reductions of this magnitude may place severe limits on mitigation efforts. Here we examine sediment export from the Missouri system due to bed scour. The US Army Corps of Engineers has compiled changes in river stage at constant discharge for 8 stations between the lowermost dam at Yankton, South Dakota and the Missouri-Mississippi confluence at St. Louis (a distance of 1250 river km), for the period 1930-2010, which we have updated to 2015. These data show two general reaches of significant bed degradation. The first extends from the last major dam at Yankton, South Dakota downstream 300 km to Omaha, Nebraska, where degradation in response to the dam exceeds 3 m. The second reach, with >2.5 m of degradation, occurs in and around Kansas City, Missouri, and has been attributed to river training activities. The reach between Omaha and Kansas City, as well as the lower Missouri below Kansas City, show River due to bed scour following dam construction and river training. This number equates to 20-25 million tons per year, which is sufficient to account for 30% of the total Missouri River load, and 15% of the total post-dam annual sediment load for the lower Mississippi River. For perspective, the quantity of sediment exported from the Missouri River due to bed scour is greater than the total load for all

  5. COMPREHENSIVE ANALYSIS ON SEEPAGE AND STRUCTURAL STABILITY OF EARTH-ROCK DAM: A CASE STUDY OF XIQUANYAN DAM IN CHINA

    Directory of Open Access Journals (Sweden)

    Qingqing GUO

    2016-07-01

    Full Text Available Earth-rock dam is commonly used in the high-dam engineering around the world. It has been widely accepted that the analysis on structural and seepage stability plays a very important role, and it is necessary to take into account while designing the earth-rock dam. In performing the analysis of structural and seepage stability, many remarkable methods are available at current stage. However, there are still some important issues remaining unsolved, including: (1 Finite element methods (FEMs is a means of solutions to analysis seepage process, but it is often a difficult task to determine the so-called seepage coefficient, because the common-used water injection test is limited in the practical work due to the high cost and complex procedure. (2 It has long been discussed that the key parameters for structural stability analysis show a significant spatial and temporal variations. It may be partly explained by the inhomogeneous dam-filling during construction work and the developing seepage process. The consequence is that one constant value of the parameter cannot represent the above variations. In this context, we solve the above issues and introduce the solution with a practical earth-rock dam project. For determining the seepage coefficient, the data from the piezo metric tube is used to calculate the potential value, based on which the seepage coefficient can be back-analysed. Then the seepage field, as well as the seepage stability are numerically analysed using the FEM-based SEEP/W program. As to the structural safety, we take into account the spatial and temporal variations of the key parameters, and incorporate the Monte-Carlo simulation method into the commonly used M-P method to calculate the frequency distribution of the obtained structural safety factor. In this way, the structural and seepage safety can be well analysed. This study is also beneficial to provide a mature method and a theoretical insight into the earth-rock dam design

  6. 2. Semi-annual progress report 1980, no 17

    International Nuclear Information System (INIS)

    1981-01-01

    This semi-annual report deals with the experimental research carried out at the Departement de Recherche Fondamentale de Grenoble (fission, nuclear spectroscopy, heavy ion reactions, physical metallurgy, magnetism, organic molecules, theoretical chemistry, molecular physical chemistry, cellular biology, vegetal biology) [fr

  7. FULCRUM - A dam safety management and alert system

    Energy Technology Data Exchange (ETDEWEB)

    Butt, Cameron; Greenaway, Graham [Knight Piesold Ltd., Vancouver, (Canada)

    2010-07-01

    Efficient management of instrumentation, monitoring and inspection data are the keys to safe performance and dam structure stability. This paper presented a data management system, FULCRUM, developed for dam safety management. FULCRUM is a secure web-based data management system which simplifies the process of data collection, processing and analysis of the information. The system was designed to organize and coordinate dam safety management requirements. Geotechnical instrumentation such as piezometers or inclinometers and operating data can be added to the database. Data from routine surveillance and engineering inspection can also be incorporated into the database. The system provides users with immediate access to historical and recent data. The integration of a GIS system allows for rapid assessment of the project site. Customisable alerting protocols can be set to identify and respond quickly to significant changes in operating conditions and potential impacts on dam safety.

  8. The behaviour of a large dam at severe frost

    Directory of Open Access Journals (Sweden)

    M. C. SPADEA

    1972-06-01

    Full Text Available Synthesizing the problem, the action of the thrusts in the
    behaviour of t h e dam of Pieve di Cadore, makes itself conspicuous expecially
    during three periods of the year:
    1. - About the end of June, the air temperature, 011 t h e average, overcomes
    the water one in the watershed upstream the dam: the bending of
    t h e dam upstream increases from the bottom to the top.
    2. - About the end of October, the thermal conditions change; the
    mean air temperature grows lower than the mean water temperature; the
    dam begins her bending dowstream.
    3. - When the air temperature is distinctly below 0 °C, the action of
    t h e t h r u s t s grows more complexe; t h e rocky waterlogged system downstream
    of t h e dam, while cooling, swells and pushes t h e bottom of t h e dam upstream;
    at t h e higher quote, on the contrary, the t h r u s t downstream continues.
    When the strenght limit of the medium is surpassed, arises a contrast
    between the rocky system and the concrete structure: this contrast can origin
    a t e very small fractures, revealed from seismic station installed into the
    central ashlar (XIV a t 660 metres height of t h e dam, under t h e form of microshocks
    which energy is of about 10I0-10U erg.

  9. Neutron scattering. Annual progress report 1997; Neutronenstreuung. Annual progress report 1997

    Energy Technology Data Exchange (ETDEWEB)

    Allenspach, P.; Boeni, B.; Fischer, P.; Furrer, A. [Eidgenoessische Technische Hochschule, Zurich (Switzerland). Lab. fuer Neutronenstreuung

    1998-02-01

    The present progress report describes the scientific and technical activities obtained by LNS staff members in 1997. It also includes the work performed by external groups at our CRG instruments D1A and IN3 at the ILL Grenoble. Due to the outstanding properties of neutrons and x-rays the research work covered many areas of science and materials research. The highlight of the year 1997 was certainly the production of neutrons at the new spallation neutron source SINQ. From July to November, SINQ was operating for typically two days/week and allowed the commissioning of four instruments at the neutron guide system: - the triple-axis spectrometer Druechal, - the powder diffractometer DMC, - the double-axis diffractometer TOPSI, the polarised triple-axis spectrometer TASP. These instruments are now fully operational and have already been used for condensed matter studies, partly in cooperation with external groups. Five further instruments are in an advanced state, and their commissioning is expected to occur between June and October 1998: - the high-resolution powder diffractometer HRPT, - the single-crystal diffractometer TriCS, - the time-of-flight spectrometer FOCUS, - the reflectometer AMOR, - the neutron optical bench NOB. Together with the small angle neutron scattering facility SANS operated by the spallation source department, all these instruments will be made available to external user groups in the future. (author) figs., tabs., refs.

  10. Local response of a glacier to annual filling and drainage of an ice-marginal lake

    Science.gov (United States)

    Walder, J.S.; Trabant, D.C.; Cunico, M.; Fountain, A.G.; Anderson, S.P.; Anderson, R. Scott; Malm, A.

    2006-01-01

    Ice-marginal Hidden Creek Lake, Alaska, USA, outbursts annually over the course of 2-3 days. As the lake fills, survey targets on the surface of the 'ice dam' (the glacier adjacent to the lake) move obliquely to the ice margin and rise substantially. As the lake drains, ice motion speeds up, becomes nearly perpendicular to the face of the ice dam, and the ice surface drops. Vertical movement of the ice dam probably reflects growth and decay of a wedge of water beneath the ice dam, in line with established ideas about jo??kulhlaup mechanics. However, the distribution of vertical ice movement, with a narrow (50-100 m wide) zone where the uplift rate decreases by 90%, cannot be explained by invoking flexure of the ice dam in a fashion analogous to tidal flexure of a floating glacier tongue or ice shelf. Rather, the zone of large uplift-rate gradient is a fault zone: ice-dam deformation is dominated by movement along high-angle faults that cut the ice dam through its entire thickness, with the sense of fault slip reversing as the lake drains. Survey targets spanning the zone of steep uplift gradient move relative to one another in a nearly reversible fashion as the lake fills and drains. The horizontal strain rate also undergoes a reversal across this zone, being compressional as the lake fills, but extensional as the lake drains. Frictional resistance to fault-block motion probably accounts for the fact that lake level falls measurably before the onset of accelerated horizontal motion and vertical downdrop. As the overall fault pattern is the same from year to year, even though ice is lost by calving, the faults must be regularly regenerated, probably by linkage of surface and bottom crevasses as ice is advected toward the lake basin.

  11. The potential for dams to impact lowland meandering river floodplain geomorphology.

    Science.gov (United States)

    Marren, Philip M; Grove, James R; Webb, J Angus; Stewardson, Michael J

    2014-01-01

    The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection) and active impacts (changes in geomorphological processes and functioning). These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an "environmental sediment regime" to operate alongside environmental flows.

  12. The Potential for Dams to Impact Lowland Meandering River Floodplain Geomorphology

    Directory of Open Access Journals (Sweden)

    Philip M. Marren

    2014-01-01

    Full Text Available The majority of the world's floodplains are dammed. Although some implications of dams for riverine ecology and for river channel morphology are well understood, there is less research on the impacts of dams on floodplain geomorphology. We review studies from dammed and undammed rivers and include influences on vertical and lateral accretion, meander migration and cutoff formation, avulsion, and interactions with floodplain vegetation. The results are synthesized into a conceptual model of the effects of dams on the major geomorphic influences on floodplain development. This model is used to assess the likely consequences of eight dam and flow regulation scenarios for floodplain geomorphology. Sediment starvation downstream of dams has perhaps the greatest potential to impact on floodplain development. Such effects will persist further downstream where tributary sediment inputs are relatively low and there is minimal buffering by alluvial sediment stores. We can identify several ways in which floodplains might potentially be affected by dams, with varying degrees of confidence, including a distinction between passive impacts (floodplain disconnection and active impacts (changes in geomorphological processes and functioning. These active processes are likely to have more serious implications for floodplain function and emphasize both the need for future research and the need for an “environmental sediment regime” to operate alongside environmental flows.

  13. National Dam Safety Program. Potake Lake Dam (Inventory Number N.Y. 970), Passaic River Basin, Lower Hudson River Area, Rockland County, New York. Phase I Inspection Report,

    Science.gov (United States)

    1981-08-14

    facilitate thedischarge of storm flows. 2. The animal burrows, depressions , and tire ruts onthe crest of the dam should be filled, compacted and seeded. 3...storm flows. 2. The animal burrows, depressions , and tire ruts on the crest of the dam should be filled, compacted, and seeded...defined by the Recommended Guidelines for Safety Inspection of Dams (Reference 13, Appendix D). d. Hazard Classifications - Cranberry Lake Dam is one mile

  14. Dam failure analysis for the Lago de Matrullas Dam, Orocovis, Puerto Rico

    Science.gov (United States)

    Torres-Sierra, Heriberto; Gómez-Fragoso, Julieta

    2015-01-01

    The U.S. Geological Survey, in cooperation with the Puerto Rico Electric Power Authority, completed a hydrologic and hydraulic study to assess the potential hazard to human life and property associated with the hypothetical failure of the Lago de Matrullas Dam, located within the headwaters of the Río Grande de Manatí. The hydrologic study yielded outflow hydrographs and peak discharges for Lago de Matrullas and other subbasins in the Río Grande de Manatí hydrographic basin for three extreme rainfall events: (1) a 6-hour probable maximum precipitation (PMP) event, (2) a 24-hour PMP event, and (3) a 100-year-recurrence, 24-hour rainfall event. The hydraulic study simulated the hypothetical dam failure of Lago de Matrullas using hypothetical flood hydrographs generated from the hydrologic study and selected dam breach parameters. The flood wave resulting from the failure was downstream-routed through the lower reaches of the Río Matrullas, the Río Toro Negro, and the Río Grande de Manatí for determination of water-surface profiles developed from the event-based hydrologic scenarios and “sunny day” (no precipitation) conditions. The Hydrologic Modeling System (HEC–HMS) and the River Analysis System (HEC–RAS) computer programs, developed by the Hydrologic Engineering Center (HEC) of the U.S. Army Corps of Engineers, were used for the hydrologic and hydraulic modeling, respectively. The flow routing in the hydraulic analyses was performed using the unsteady-state flow module available in the HEC–RAS model.

  15. Impact of dam-building on marine life

    Science.gov (United States)

    Pandian, T. J.

    1980-03-01

    Dam-building across naturally flowing rivers tends to decrease discharge of surplus water into the sea, reduce nutrient concentration in estuaries and coastal waters, and diminish plankton blooms as well as fish landings. Depletion of nutrients and organic matter along with reduced mud and silt deposition affect benthic life on the continental shelf. Reduced mud and silt deposition leads to coastal retreat. Dams, especially those constructed for hydro-electric purposes, hinder migration of fishes and decapods. Discharge from dams can create barriers at high or low flows, cause delays, disrupt normal behavioural routine and change the travel speed of migratory animals. Where all spawners of a given population are frequently kept away from the breeding site, the population faces extinction.

  16. DESIGN OF SLIT DAMS FOR CONTROLLING STONY DEBRIS FLOWS

    Institute of Scientific and Technical Information of China (English)

    Hui-Pang LIEN

    2003-01-01

    A new method to a slit dam for controlling the stony debris flow has been derived based on the mass conservation law of the stony debris flow passing through a slit dam and the laboratory experiment results.This new method is then combined with three primary efficiency expressions: the dimensionless sediment outflow ratio,the sediment concentration ratio,and the sediment storage rate to develop a simple module,with which the height and the spacing of the posts,as well as the total spacing of slit dam are determined.Furthermore,these expressions can also be applied to check those slit dams that have already been constructed with their effectiveness against various magnitudes of the debris flow. The comparison between these expressions and laboratory data is in reasonable agreement.

  17. Putting Roman Dams in Context: a Virtual Approach

    Science.gov (United States)

    Decker, M. J.; Du Vernay, J. P.; Mcleod, J. B.

    2017-08-01

    Water resources and management have become a critical global issue. During the half-millennium of its existence, the Roman Empire developed numerous strategies to cope with water management, from large-scale urban aqueduct systems, to industrial-scale water mills designed to cope with feeding growing city populations. Roman engineers encountered, adopted, and adapted indigenous hydraulic systems, and left lasting imprints on the landscape of the Mediterranean and temperate Western Europe by employing a range of water technologies. A recent academic study has enabled the identification of remains of and references to seventy-two dams from the Roman era, constructed in Spain between the 1st and 4th century AD. Such unique heritage, without comparisons in the Mediterranean makes Spain an emblematic case study for the analysis of Roman hydraulic engineering and water management policies. Fifty dams have been located and detailed. The twenty-two outstanding, although identified on the ground, have not been able to be acceptably characterized, due in some cases to their being ruins in a highly degraded state, others due to their being masked by repairs and reconstructions subsequent to the Roman era. A good example of such neglected dams is the buttress dam of Consuegra , in Toledo province (Castilla-La Mancha). Dating to the 3rd - 4th century AD, the Dam of Consuegra, on the basin of the Guadiana, with its over 600 metres length and 4,80 metres height, is a remarkable case of Roman engineering mastery. It had a retaining wall upstream, numerous buttresses and perhaps an embankment downstream, of which no remains are left. The application of 3D digital imaging technique to create a high quality virtual model of such monuments has proved to be successful especially for the study of the technological aspects related its construction. The case study of the Roman dam of Muel (Zaragoza) has shown, in fact, as best practices in digital archaeology can provide an original and

  18. River Restoration by Dam Removal: Assessing Riverine Re-Connectivity Across New England

    Science.gov (United States)

    Magilligan, F. J.; Nislow, K. H.; Graber, B.; Sneddon, C.; Fox, C.; Martin, E.

    2014-12-01

    The impacts of dams in New England are especially acute as it possesses one of the highest densities of dams in the US, with the NID documenting more than 4,000 dams, and state agency records indicating that >14,000 dams are peppered throughout the landscape. This large number of dams contributes to pervasive watershed fragmentation, threatening the ecological integrity of rivers and streams, and in the case of old, poorly maintained structures, posing a risk to lives and property. These concerns have generated active dam removal efforts throughout New England. To best capture the geomorphic, hydrologic, and potential ecological effects of dam removal at a regional level, we have compiled a dataset of 127 removed dams in New England, which includes information about structural characteristics, georectified locations, and key watershed attributes (including basin size, distance to next upstream obstacle, and number of free-flowing river kms opened up). Our specific research questions address (1) what is the spatial distribution of removed dams and how does this pattern relate to stated management goals of restoring critical habitat for native resident freshwater and diadromous fish, (2) what are the structural or management commonalities in dam types that have been removed, and (3) what has been the incremental addition of free-flowing river length? Rather than reflecting an overall management prioritization strategy, results indicate that dam removals are characterized more by opportunistic removals. For example, despite a regional emphasis on diadromous fish protection and restoration, most removals are inland rather than coastal settings. Most of the removed dams were small (~ 45% 2,300 river kms over the past several decades, with implication for both resident and diadromous fish, and with many removals located in mid-sized rivers that are a key link between upstream and downstream/coastal aquatic ecosystems.

  19. Progress report on nuclear science and technology in China (Vol.1). Proceedings of academic annual meeting of China Nuclear Society in 2009, No.5

    International Nuclear Information System (INIS)

    2010-11-01

    Progress report on nuclear science and technology in China (Vol. 1) includes 889 articles which are communicated on the first national academic annual meeting of China Nuclear Society. There are 10 books totally. This is the fifth one, the content is about radiation protection and nuclear chemical industry.

  20. Energy Division annual progress report for period ending September 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Stone, J.N. (ed.)

    1992-04-01

    The Energy Division is one of 17 research divisions at Oak Ridge Laboratory. Its goals and accomplishments are described in this annual progress report for FY 1991. The division's total expenditures in FY 1991 were $39.1 million. The work is supported by the US Department of Energy, US Department of Defense, many other federal agencies, and some private organizations. Disciplines of the 124 technical staff members include engineering, social sciences, physical and life sciences, and mathematics and statistics. The Energy Division's programmatic activities focus on three major areas: (1) analysis and assessment, (2) energy conservation technologies, and (3) military transportation systems. Analysis and assessment activities cover energy and resource analysis, the preparation of environmental assessments and impact statements, research on waste management, analysis of emergency preparedness for natural and technological disasters, analysis of the energy and environmental needs of developing countries, technology transfer, and analysis of civilian transportation. Energy conservation technologies include electric power systems, building equipment (thermally activated heat pumps, advanced refrigeration systems, novel cycles), building envelopes (walls, foundations, roofs, attics, and materials), and technical issues for improving energy efficiency in existing buildings. Military transportation systems concentrate on research for sponsors within the US military on improving the efficiency of military deployment, scheduling, and transportation coordination.

  1. Energy Division annual progress report for period ending September 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Stone, J.N. [ed.

    1992-04-01

    The Energy Division is one of 17 research divisions at Oak Ridge Laboratory. Its goals and accomplishments are described in this annual progress report for FY 1991. The division`s total expenditures in FY 1991 were $39.1 million. The work is supported by the US Department of Energy, US Department of Defense, many other federal agencies, and some private organizations. Disciplines of the 124 technical staff members include engineering, social sciences, physical and life sciences, and mathematics and statistics. The Energy Division`s programmatic activities focus on three major areas: (1) analysis and assessment, (2) energy conservation technologies, and (3) military transportation systems. Analysis and assessment activities cover energy and resource analysis, the preparation of environmental assessments and impact statements, research on waste management, analysis of emergency preparedness for natural and technological disasters, analysis of the energy and environmental needs of developing countries, technology transfer, and analysis of civilian transportation. Energy conservation technologies include electric power systems, building equipment (thermally activated heat pumps, advanced refrigeration systems, novel cycles), building envelopes (walls, foundations, roofs, attics, and materials), and technical issues for improving energy efficiency in existing buildings. Military transportation systems concentrate on research for sponsors within the US military on improving the efficiency of military deployment, scheduling, and transportation coordination.

  2. Fusion Energy Division annual progress report, period ending December 31, 1989

    Energy Technology Data Exchange (ETDEWEB)

    Sheffield, J.; Baker, C.C.; Saltmarsh, M.J.

    1991-07-01

    The Fusion Program of Oak Ridge National Laboratory (ORNL) carries out research in most areas of magnetic confinement fusion. The program is directed toward the development of fusion as an energy source and is a strong and vital component of both the US fusion program and the international fusion community. Issued as the annual progress report of the ORNL Fusion Energy Division, this report also contains information from components of the Fusion Program that are carried out by other ORNL organizations (about 15% of the program effort). The areas addressed by the Fusion Program and discussed in this report include the following: Experimental and theoretical research on magnetic confinement concepts, engineering and physics of existing and planned devices, including remote handling, development and testing of diagnostic tools and techniques in support of experiments, assembly and distribution to the fusion community of databases on atomic physics and radiation effects, development and testing of technologies for heating and fueling fusion plasmas, development and testing of superconducting magnets for containing fusion plasmas, development and testing of materials for fusion devices, and exploration of opportunities to apply the unique skills, technology, and techniques developed in the course of this work to other areas. Highlights from program activities are included in this report.

  3. Fusion Energy Division: Annual progress report, period ending December 31, 1987

    Energy Technology Data Exchange (ETDEWEB)

    Morgan, O.B. Jr.; Berry, L.A.; Sheffield, J.

    1988-11-01

    The Fusion Program of Oak Ridge National Laboratory (ORNL), a major part of the national fusion program, carries out research in nearly all areas of magnetic fusion. Collaboration among staff from ORNL, Martin Marietta Energy Systems, Inc., private industry, the academic community, and other fusion laboratories, in the United States and abroad, is directed toward the development of fusion as an energy source. This report documents the program's achievements during 1987. Issued as the annual progress report of the ORNL Fusion Energy Division, it also contains information from components of the Fusion Program that are external to the division (about 15% of the program effort). The areas addressed by the Fusion Program include the following: experimental and theoretical research on magnetic confinement concepts, engineering and physics of existing and planned devices, development and testing of diagnostic tools and techniques in support of experiments, assembly and distribution to the fusion community of databases on atomic physics and radiation effects, development and testing of technologies for heating and fueling fusion plasmas, development and testing of superconducting magnets for containing fusion plasmas, and development and testing of materials for fusion devices. Highlights from program activities are included in this report. 126 figs., 15 tabs.

  4. Fusion Energy Division annual progress report, period ending December 31, 1989

    International Nuclear Information System (INIS)

    Sheffield, J.; Baker, C.C.; Saltmarsh, M.J.

    1991-07-01

    The Fusion Program of Oak Ridge National Laboratory (ORNL) carries out research in most areas of magnetic confinement fusion. The program is directed toward the development of fusion as an energy source and is a strong and vital component of both the US fusion program and the international fusion community. Issued as the annual progress report of the ORNL Fusion Energy Division, this report also contains information from components of the Fusion Program that are carried out by other ORNL organizations (about 15% of the program effort). The areas addressed by the Fusion Program and discussed in this report include the following: Experimental and theoretical research on magnetic confinement concepts, engineering and physics of existing and planned devices, including remote handling, development and testing of diagnostic tools and techniques in support of experiments, assembly and distribution to the fusion community of databases on atomic physics and radiation effects, development and testing of technologies for heating and fueling fusion plasmas, development and testing of superconducting magnets for containing fusion plasmas, development and testing of materials for fusion devices, and exploration of opportunities to apply the unique skills, technology, and techniques developed in the course of this work to other areas. Highlights from program activities are included in this report

  5. Fusion Energy Division: Annual progress report, period ending December 31, 1987

    International Nuclear Information System (INIS)

    Morgan, O.B. Jr.; Berry, L.A.; Sheffield, J.

    1988-11-01

    The Fusion Program of Oak Ridge National Laboratory (ORNL), a major part of the national fusion program, carries out research in nearly all areas of magnetic fusion. Collaboration among staff from ORNL, Martin Marietta Energy Systems, Inc., private industry, the academic community, and other fusion laboratories, in the United States and abroad, is directed toward the development of fusion as an energy source. This report documents the program's achievements during 1987. Issued as the annual progress report of the ORNL Fusion Energy Division, it also contains information from components of the Fusion Program that are external to the division (about 15% of the program effort). The areas addressed by the Fusion Program include the following: experimental and theoretical research on magnetic confinement concepts, engineering and physics of existing and planned devices, development and testing of diagnostic tools and techniques in support of experiments, assembly and distribution to the fusion community of databases on atomic physics and radiation effects, development and testing of technologies for heating and fueling fusion plasmas, development and testing of superconducting magnets for containing fusion plasmas, and development and testing of materials for fusion devices. Highlights from program activities are included in this report. 126 figs., 15 tabs

  6. Calculating earth dam seepage using HYDRUS software applications

    Directory of Open Access Journals (Sweden)

    Jakub Nieć

    2017-06-01

    Full Text Available This paper presents simulations of water seepage within and under the embankment dam of Lake Kowalskie reservoir. The aim of the study was to compare seepage calculation results obtained using analytical and numerical methods. In April 1985, after the first filling of the reservoir to normal storage levels, water leaks was observed at the base of the escarpment, on the air side of the dam. In order to control seepage flow, drainage was performed and additional piezometers installed. To explain the causes of increased pressure in the aquifer under the dam in May 1985 a simplified calculation of filtration was performed. Now, on the basis of archived data from the Department of Hydraulic and Sanitary Engineering using 3D HYDRUS STANDARD software, the conditions of seepage under the dam have been recreated and re-calculated. Piezometric pressure was investigated in three variants of drainage, including drainage before and after modernization.

  7. Safety management of the Karapiro dam, New Zealand

    International Nuclear Information System (INIS)

    Everitt, S.C.

    1995-01-01

    The dam safety program for 36 hydraulic structures in New Zealand were presented, with special emphasis on the application of this program to the Karapiro dam. The management of the hazard presented by the dam was detailed, and the proposed solutions for its remediation were presented. Dynamic analysis was employed using an elastic 3-D finite element model, using actual earthquake time history records as an input, scaled to the required Maximum Credibility Earthquake (MCE). The results confirmed that the arch section of the Karapiro dam was satisfactory, as was the spillway block, provided that drainage was preserved, however, the left abutment and thrust block were considered unstable. Four options were proposed for strengthening the abutment: (1) lowering the groundwater, (2) installation of stresses anchors, (3) mass concrete buttressing upstream and/or downstream, and (4) installation of reinforced concrete shear keys. However, prior to undertaking any remediation work, rock mass properties and groundwater conditions should be re-investigated. 1 ref., 7 figs

  8. Mapping the social impacts of small dams: The case of Thailand's Ing River basin.

    Science.gov (United States)

    Fung, Zali; Pomun, Teerapong; Charles, Katrina J; Kirchherr, Julian

    2018-05-24

    The social impacts of large dams have been studied extensively. However, small dams' social impacts have been largely neglected by the academic community. Our paper addresses this gap. We examine the social impacts of multiple small dams in one upstream and one downstream village in Thailand's Ing River basin. Our research is based on semi-structured interviews with beneficiaries, government and NGOs. We argue that small dams' social impacts are multi-faceted and unequal. The dams were perceived to reduce fish abundance and provide flood mitigation benefits. Furthermore, the dams enabled increased access to irrigation water for upstream farmers, who re-appropriated water via the dams at the expense of those downstream. The small dams thus engendered water allocation conflicts. Many scholars, practitioners and environmentalists argue that small dams are a benign alternative to large dams. However, the results of our research mandate caution regarding this claim.

  9. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispell Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); O' Connor, Dick (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-01-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan

  10. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

    2005-11-01

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The

  11. Examining the economic impacts of hydropower dams on property values using GIS.

    Science.gov (United States)

    Bohlen, Curtis; Lewis, Lynne Y

    2009-07-01

    While the era of dam building is largely over in the United States, globally dams are still being proposed and constructed. The articles in this special issue consider many aspects and impacts of dams around the world. This paper examines dam removal and the measurement of the impacts of dams on local community property values. Valuable lessons may be found. In the United States, hundreds of small hydropower dams will come up for relicensing in the coming decade. Whether or not the licenses are renewed and what happens to the dams if the licenses expires is a subject of great debate. Dams are beginning to be removed for river restoration and fisheries restoration and these "end-of-life" decisions may offer lessons for countries proposing or currently building small (and large) hydropower dams. What can these restoration stories tell us? In this paper, we examine the effects of dams along the Penobscot River in Maine (USA) on residential property values. We compare the results to findings from a similar (but ex post dam removal) data set for properties along the Kennebec river in Maine, where the Edwards Dam was removed in 1999. The Penobscot River Restoration Project, an ambitious basin-wide restoration effort, includes plans to remove two dams and decommission a third along the Penobscot River. Dam removal has significant effects on the local environment, and it is reasonable to anticipate that environmental changes will themselves be reflected in changes in property values. Here we examine historical real estate transaction data to examine whether landowners pay a premium or penalty to live near the Penobscot River or near a hydropower generating dam. We find that waterfront landowners on the Penobscot or other water bodies in our study area pay approximately a 16% premium for the privilege of living on the water. Nevertheless, landowners pay LESS to live near the Penobscot River than they do to live further away, contrary to the expectation that bodies of water

  12. Strategies of Successful Anti-Dam Movements: Evidence from Myanmar and Thailand

    NARCIS (Netherlands)

    Kirchherr, J.W.|info:eu-repo/dai/nl/411261487

    2018-01-01

    Scholars are rarely able to examine anti-dam movements that result in project suspensions or cancellations since these cases are rare empirically. Yet, they are central to understanding how anti-dam movements can succeed. This paper analyzes the movements against Myanmar’s Myitsone Dam and

  13. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zabel, Richard; Williams, John G.; Smith, Steven G. (Northwest and Alaska Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2002-06-01

    In 2001, the National Marine Fisheries Service and the University of Washington completed the ninth year of a study to estimate survival and travel time of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from passive integrated transponder (PIT)-tagged fish. We PIT tagged and released at Lower Granite Dam a total of 17,028 hatchery and 3,550 wild steelhead. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream of the hydropower system and sites within the hydropower system. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using the Single-Release Model. Primary research objectives in 2001 were to: (1) estimate reach and project survival and travel time in the Snake and Columbia Rivers throughout the yearling chinook salmon and steelhead migrations; (2) evaluate relationships between survival estimates and migration conditions; and (3) evaluate the survival-estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2001 for PIT-tagged yearling chinook salmon and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Results are reported primarily in the form of tables and figures with a minimum of text. More details on methodology and statistical models used are provided in previous reports cited in the text. Results for summer-migrating chinook salmon will be reported separately.

  14. Evaluating temporal changes in hydraulic conductivities near karst-terrain dams: Dokan Dam (Kurdistan-Iraq)

    Science.gov (United States)

    Dafny, Elad; Tawfeeq, Kochar Jamal; Ghabraie, Kazem

    2015-10-01

    Dam sites provide an outstanding opportunity to explore dynamic changes in the groundwater flow regime because of the high hydraulic gradient rapidly induced in their surroundings. This paper investigates the temporal changes of the hydraulic conductivities of the rocks and engineered structures via a thorough analysis of hydrological data collected at the Dokam Dam, Iraq, and a numerical model that simulates the Darcian component of the seepage. Analysis of the data indicates increased seepage with time and suggests that the hydraulic conductivity of the rocks increased as the conductivity of the grout curtain decreased. Conductivity changes on the order of 10-8 m/s, in a 20-yr period were quantified using the numerical analysis. It is postulated that the changes in hydraulic properties in the vicinity of Dokan Dam are due to suspension of fine materials, interbedded in small fissures in the rocks, and re-settlement of these materials along the curtain. Consequently, the importance of the grout curtain to minimize the downstream seepage, not only as a result of the conductivity contrast with the rocks, but also as a barrier to suspended clay sediments, is demonstrated. The numerical analysis also helped us to estimate the proportion of the disconnected karstic conduit flow to the overall flow.

  15. Endocrine-disruptor molecular responses, occurrence of intersex and gonado-histopathological changes in tilapia species from a tropical freshwater dam (Awba Dam) in Ibadan, Nigeria

    International Nuclear Information System (INIS)

    Adeogun, Aina O.; Onibonoje, Kolawole; Ibor, Oju R.; Omiwole, Roseline A.; Chukwuka, Azubuike V.; Ugwumba, Alex O.; Ugwumba, Adiaha A.A.; Arukwe, Augustine

    2016-01-01

    Highlights: • Occurrence and severity of intersex in Nigerian aquatic environment. • Estrogenic and reproductive developmental effects of effluents from a University community. • Biomarker of endocrine disruption in fish from a developing country. • Relationship between estrogenic responses and sediment contaminants burden in a dam used for University domestic water supply and for fisheries. • Possible health consequences of environmental contamination - Abstract: In the present study, the occurrence of endocrine disruptive responses in Tilapia species from Awba Dam has been investigated, and compared to a reference site (Modete Dam). The Awba Dam is a recipient of effluents from University of Ibadan (Nigeria) and several other anthropogenic sources. A total of 132 Tilapia species (Sarotherodon malenotheron (n = 57 and 32, males and females, respectively) and Tilapia guineensis (n = 23 and 20, males and females, respectively)) were collected from June to September 2014. At the reference site, samples of adult male and female S. melanotheron (48 males and 47 females) and T. guineensis (84 males and 27 females) were collected. Gonads were morphologically and histologically examined and gonadosomatic index (GSI) was calculated. Hepatic mRNA transcriptions of vitellogenin (Vtg) and zona radiata protein (Zrp) genes were analyzed using validated RT-qPCR. Significant increase in Vtg and Zrp transcripts were observed in male tilapias from Awba Dam, compared to males from the reference site. In addition, male tilapias from Awba Dam produced significantly higher Vtg and Zrp mRNA, compared to females in June and July. However, at the natural peak spawning period in August and September, females produced, significantly higher Vtg and Zrp mRNA, compared to males. Fish gonads revealed varying incidence of intersex with a striking presence of two (2) pairs of testes and a pair of ovary in S. melanotheron from Awba Dam. The entire fish population examined at Awba Dam

  16. Endocrine-disruptor molecular responses, occurrence of intersex and gonado-histopathological changes in tilapia species from a tropical freshwater dam (Awba Dam) in Ibadan, Nigeria

    Energy Technology Data Exchange (ETDEWEB)

    Adeogun, Aina O.; Onibonoje, Kolawole; Ibor, Oju R.; Omiwole, Roseline A.; Chukwuka, Azubuike V.; Ugwumba, Alex O.; Ugwumba, Adiaha A.A. [Department of Zoology, University of Ibadan, Ibadan (Nigeria); Arukwe, Augustine, E-mail: arukwe@bio.ntnu.no [Department of Biology, Norwegian University of Science and Technology (NTNU), 7491 Trondheim (Norway)

    2016-05-15

    Highlights: • Occurrence and severity of intersex in Nigerian aquatic environment. • Estrogenic and reproductive developmental effects of effluents from a University community. • Biomarker of endocrine disruption in fish from a developing country. • Relationship between estrogenic responses and sediment contaminants burden in a dam used for University domestic water supply and for fisheries. • Possible health consequences of environmental contamination - Abstract: In the present study, the occurrence of endocrine disruptive responses in Tilapia species from Awba Dam has been investigated, and compared to a reference site (Modete Dam). The Awba Dam is a recipient of effluents from University of Ibadan (Nigeria) and several other anthropogenic sources. A total of 132 Tilapia species (Sarotherodon malenotheron (n = 57 and 32, males and females, respectively) and Tilapia guineensis (n = 23 and 20, males and females, respectively)) were collected from June to September 2014. At the reference site, samples of adult male and female S. melanotheron (48 males and 47 females) and T. guineensis (84 males and 27 females) were collected. Gonads were morphologically and histologically examined and gonadosomatic index (GSI) was calculated. Hepatic mRNA transcriptions of vitellogenin (Vtg) and zona radiata protein (Zrp) genes were analyzed using validated RT-qPCR. Significant increase in Vtg and Zrp transcripts were observed in male tilapias from Awba Dam, compared to males from the reference site. In addition, male tilapias from Awba Dam produced significantly higher Vtg and Zrp mRNA, compared to females in June and July. However, at the natural peak spawning period in August and September, females produced, significantly higher Vtg and Zrp mRNA, compared to males. Fish gonads revealed varying incidence of intersex with a striking presence of two (2) pairs of testes and a pair of ovary in S. melanotheron from Awba Dam. The entire fish population examined at Awba Dam

  17. Application of the Periodic Average System Model in Dam Deformation Analysis

    Directory of Open Access Journals (Sweden)

    Yueqian Shen

    2015-01-01

    Full Text Available Dams are among the most important hydraulic engineering facilities used for water supply, flood control, and hydroelectric power. Monitoring of dams is crucial since deformation might have occurred. How to obtain the deformation information and then judge the safe conditions is the key and difficult problem in dam deformation monitoring field. This paper proposes the periodic average system model and creates the concept of “settlement activity” based on the dam deformation issue. Long-term deformation monitoring data is carried out in a pumped-storage power station, this model combined with settlement activity is used to make the single point deformation analysis, and then the whole settlement activity profile is drawn by clustering analysis. Considering the cumulative settlement value of every point, the dam deformation trend is analyzed in an intuitive effect way. The analysis mode of combined single point with multipoints is realized. The results show that the key deformation information of the dam can be easily grasped by the application of the periodic average system model combined with the distribution diagram of settlement activity. And, above all, the ideas of this research provide an effective method for dam deformation analysis.

  18. Optimization design of foundation excavation for Xiluodu super-high arch dam in China

    Directory of Open Access Journals (Sweden)

    Qixiang Fan

    2015-04-01

    Full Text Available With better understanding of the quality and physico-mechanical properties of rocks of dam foundation, and the physico-mechanical properties and structure design of arch dam in association with the foundation excavation of Xiluodu arch dam, the excavation optimization design was proposed for the foundation surface on the basis of feasibility study. Common analysis and numerical analysis results demonstrated the feasibility of using the weakly weathered rocks III1 and III2 as the foundation surface of super-high arch dam. In view of changes in the geological conditions at the dam foundation along the riverbed direction, the design of extending foundation surface excavation area and using consolidating grouting and optimizing structure of dam bottom was introduced, allowing for harmonization of the arch dam and foundation. Three-dimensional (3D geomechanics model test and finite element analysis results indicated that the dam body and foundation have good overload stability and high bearing capacity. The monitoring data showed that the behaviors of dam and foundation correspond with the designed patterns in the construction period and the initial operation period.

  19. Hungry Horse Dam Fisheries Mitigation : Fish Passage and Habitat Improvement in the Upper Flathead River Basin, 1991-1996 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knotek, W.Ladd; Deleray, Mark; Marotz, Brian L.

    1997-08-01

    In the past 50 years, dramatic changes have occurred in the Flathead Lake and River system. Degradation of fishery resources has been evident, in part due to deterioration of aquatic habitat and introduction of non-endemic fish and invertebrate species. Habitat loss has been attributed to many factors including the construction and operation of Hungry Horse Dam, unsound land use practices, urban development, and other anthropogenic and natural disturbances. Fish migration has also been limited by barriers such as dams and impassible culverts. Cumulatively, these factors have contributed to declines in the distribution and abundance of native fish populations. Recovery of fish populations requires that a watershed approach be developed that incorporates long-term aquatic habitat needs and promotes sound land use practices and cooperation among natural resource management agencies. In this document, the authors (1) describe completed and ongoing habitat improvement and fish passage activities under the Hungry Horse Fisheries Mitigation Program, (2) describe recently identified projects that are in the planning stage, and (3) develop a framework for identifying prioritizing, implementing, and evaluating future fish habitat improvement and passage projects.

  20. Dam-Break Flood Analysis Upper Hurricane Reservoir, Hartford, Vermont

    National Research Council Canada - National Science Library

    Acone, Scott

    1995-01-01

    .... Various dam break flood conditions were modeled and inundation maps developed. Based on this analysis the dam is rated a Class 2 or significant hazard category in terms of its potential to cause downstream damage...

  1. Strobe Light Testing and Kokanee Population Monitoring : Dworshak Dam Impacts Assessment and Fisheries Investigation Project, 87-99 : Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Maiolie, Melo A.; Harryman, Bill; Ament, Willaim J.

    1999-11-01

    We tested the response of kokanee Oncorhynchus nerka to strobe lights. Testing was conducted on wild, free-ranging fish in their natural environment (i.e., the pelagic region of two large Idaho lakes). Split-beam hydroacoustics were used to record the distance kokanee moved away from the lights, as well as the density of kokanee in the area near the lights. In control tests, where strobe lights were lowered into the lake but kept turned off, kokanee remained within a few meters of the lights. Once the lights began flashing, kokanee quickly moved away from the light source. Kokanee moved 20 to 40 m away from the lights in waters with Secchi transparencies from 3 to 5 m. Kokanee densities near the lights were significantly lower (p=0.07 to p=0.00) when the lights were turned on than in control samples with no lights flashing. Flash rates of 300, 360, and 450 flashes/min elicited strong avoidance responses from the fish. Kokanee remained at least 24 m from the lights during our longest test that lasted for 5 h 50 min. We also continued annual monitoring of the kokanee population in Dworshak Reservoir. Spawner counts in four tributary streams that were used as an index of the adult population reached a record low of 144 spawners. No age-1 or age-2 kokanee were caught in 15 trawl hauls used to make population estimates. The population estimate of fry was 65,000 fish, {+-} 76% (90% C.I.). Flooding during the spring of 1996 was responsible for the low kokanee population.

  2. Review Article: Numerical analysis of the seismic behaviour of earth dam

    Directory of Open Access Journals (Sweden)

    Y. Parish

    2009-03-01

    Full Text Available The present study concerns analysis of the seismic response of earth dams. The behaviour of both the shell and core of the dam is described using the simple and popular non associated Mohr-Coulomb criterion. The use of this constitutive model is justified by the difficulty to obtain constitutive parameters for more advanced constitutive relations including isotropic and kinematic hardening. Analyses with real earthquake records show that the seismic loading induces plasticity in a large part of the shell and in the lower part of the core. Analysis shows that plasticity should be considered in the analysis of the seismic response of the dam, because it leads to a decrease in the natural frequencies of the dam together to energy dissipation, which could significantly affect the seismic response of the dam. Plastic analysis constitutes also a good tool for the verification of the stability of the dam under seismic loading.

  3. Potential Risk Analysis of Tailings Dam under Preloading Condition and Its Countermeasures

    Directory of Open Access Journals (Sweden)

    Shuren Wang

    2015-01-01

    Full Text Available It is very important for mine production safety to ensure the stability of the tailings dam. Taking a flatland tailings pond as the background, a threedimensional computational model was built based on a tailings dam under mullock heap preloading condition. Considering the current operating water level conditions, a liquid-solid coupling analysis of the model was conducted.The deformation characteristics of the tailings dam were revealed during successive preloading at the front of the dam. The safety factor and the potential slide face of the tailings dam were calculated under different conditions using the strength reduction method. The results show that the tailings dam in its current condition is basically stable, but if the mullock heap continues to be heightened, the tailings dam will become unstable. Therefore, in order to limit the height of the mullock heap, establishing a monitor and early warning mechanism are put forward to ensure mine production safety.

  4. Seismic rehabilitation and analysis of Chaohe earth dam

    Science.gov (United States)

    Fu, Lei; Zeng, Xiangwu

    2005-12-01

    Stability of earth dams during earthquakes has been a major concern for geotechnical engineers in seismic active regions. Liquefaction induced slope failure occurred at the upstream slope of a major earth dam in the suburb of Beijing, China, during the 1976 Tangshan Earthquake. The gravelly soil with loose initial condition liquefied under relatively small ground vibration. In recent years, a major seismic rehabilitation project was carried out on a similar earth dam nearby using dumped quarry stone. Seismic stability analysis was carried out using model test, finite element simulation, and pseudo-static slope stability program after taking into account the influence of excess pore pressure.

  5. Allegheny County Dam Locations

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset shows the point locations of dams in Allegheny County. If viewing this description on the Western Pennsylvania Regional Data Center’s open data portal...

  6. Report and recommendations of the task force on tree and shrub planting on active oil sands tailings dams

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-02-15

    In oil sands reclamation operations in Canada there is a conflict between dam safety and the planting of trees and woody shrubs. Indeed, tree planting is being restricted on the downstream slopes of dams to avoid damage to drains and to ensure the integrity of visual and instrumentation monitoring conflicting thus with progressive reclamation. Alberta Environment hired the Oil Sands Research and Information Network (OSRIN), an independent organization which analyzes and interprets available knowledge on soil and water reclamation in the oil sands mining sector, to address this issue and make recommendations. The organization appointed a Task Force which presented its final report in March 2011. The Task Force recommended that the Engineer of Record should be responsible for determining the tree and shrub planting zones and that he should submit his plans to Alberta Environment for approval.

  7. Endocrine-disruptor molecular responses, occurrence of intersex and gonado-histopathological changes in tilapia species from a tropical freshwater dam (Awba Dam) in Ibadan, Nigeria.

    Science.gov (United States)

    Adeogun, Aina O; Onibonoje, Kolawole; Ibor, Oju R; Omiwole, Roseline A; Chukwuka, Azubuike V; Ugwumba, Alex O; Ugwumba, Adiaha A A; Arukwe, Augustine

    2016-05-01

    In the present study, the occurrence of endocrine disruptive responses in Tilapia species from Awba Dam has been investigated, and compared to a reference site (Modete Dam). The Awba Dam is a recipient of effluents from University of Ibadan (Nigeria) and several other anthropogenic sources. A total of 132 Tilapia species (Sarotherodon malenotheron (n=57 and 32, males and females, respectively) and Tilapia guineensis (n=23 and 20, males and females, respectively)) were collected from June to September 2014. At the reference site, samples of adult male and female S. melanotheron (48 males and 47 females) and T. guineensis (84 males and 27 females) were collected. Gonads were morphologically and histologically examined and gonadosomatic index (GSI) was calculated. Hepatic mRNA transcriptions of vitellogenin (Vtg) and zona radiata protein (Zrp) genes were analyzed using validated RT-qPCR. Significant increase in Vtg and Zrp transcripts were observed in male tilapias from Awba Dam, compared to males from the reference site. In addition, male tilapias from Awba Dam produced significantly higher Vtg and Zrp mRNA, compared to females in June and July. However, at the natural peak spawning period in August and September, females produced, significantly higher Vtg and Zrp mRNA, compared to males. Fish gonads revealed varying incidence of intersex with a striking presence of two (2) pairs of testes and a pair of ovary in S. melanotheron from Awba Dam. The entire fish population examined at Awba Dam showed a high prevalence of intersex (34.8%), involving phenotypic males and females of both species. Analysis of sediment contaminant levels revealed that As, Cd, Pb, Hg and Ni (heavy metals), monobutyltin cation, 4-iso-nonyphenol and PCB congeners (138, 153 and 180) were significantly higher in Awba Dam, compared to the reference site. Principal component analysis (PCA) showed that fish variables were positively correlated with sediment contaminant burden at Awba Dam, indicating

  8. Personal dose estimations for Olympic Dam's first year of production

    International Nuclear Information System (INIS)

    Sonter, M.; Hondros, J.

    1989-01-01

    Underground development activities have been underway at Olympic Dam since 1983; commercial ore extraction commenced in early 1988; and the metallurgical treatment plant commenced operation in mid 1988. Detailed and extensive radiation monitoring programs have been in place since commencement of activities and have enabled detailed individual assessment of personal doses. Results are shown, in histogram form, of doses to full and part-time underground mine workers pre-1988 and for calendar 1988; and projected annual doses to treatment plant workers for the period July 1988 to July 1989. Comments are included on the dose calculation assumptions applying in mine and mill and on the degree of conservatism of these assumptions. The doses presented show compliance with the limits quoted in the Australian code of practice; they compare well with other underground uranium mines, and they indicate effective pursuit of the 'alara' principle. 7 figs., 1 tab

  9. Watershed restoration: planning and implementing small dam removals to maximize ecosystem services

    Science.gov (United States)

    Tonitto, C.; Riha, S. J.

    2016-12-01

    River restoration and enhancing watershed connectivity is of growing concern in industrialized nations. The past two decades have seen a number of small dam removals, though many removals remain unstudied and poorly documented. We summarize socio-economic and biophysical lessons learned during the past two decades of accelerated activity regarding small dam removals throughout the United States. We present frameworks for planning and implementing removals developed by interdisciplinary engagement. Toward the goal of achieving thorough dam removal planning, we present outcomes from well-documented small dam removals covering ecological, chemical, and physical change in rivers post-dam removal, including field observation and modeling methodologies. Guiding principles of a dam removal process should include: 1) stakeholder engagement to navigate the complexity of watershed landuse, 2) an impacts assessment to inform the planning process, 3) pre- and post-dam removal observations of ecological, chemical and physical properties, 4) the expectation that there are short- and long-term ecological dynamics with population recovery depending on whether dam impacts were largely related to dispersion or to habitat destruction, 5) an expectation that changes in watershed chemistry are dependent on sediment type, sediment transport and watershed landuse, and 6) rigorous assessment of physical changes resulting from dam removal, understanding that alteration in hydrologic flows, sediment transport, and channel evolution will shape ecological and chemical dynamics, and shape how stakeholders engage with the watershed.

  10. Planning for a major expansion of the olympic dam copper/uranium resource in South Australia

    International Nuclear Information System (INIS)

    Higgins, R. J.

    2006-01-01

    Full text: Full text: The polymetallic Olympic Dam deposit in northern South Australia contains the world's largest known economic uranium resource. The current resource estimate is 3,970 million tones at 0.4 kg/t U308. Uranium is a co-product of an existing operation that also produces copper, gold and silver. Production began in 1998. Ore mined in 2006 is expected to be close to 10 million tones to produce 4,500 tonnes of uranium oxide and 220,000 tonnes of copper cathode. BHP Billiton is undertaking a pre-feasibility study into expanding annual production capacity to about 15,000 tonnes of uranium and 500,000 tonnes copper. Subject to successful completion of the pre-feasibility study and a final feasibility study, construction of the expansion could begin by early 2009, with the expanded production capacity being commissioned in 2013. The resource estimate has been significantly increased by drilling of the so-far undeveloped southern section of the orebody. Current planning indicates that this section could be mined by open pit. Ore is at depth and extends from 350 metres to about 1000 metres below surface. The existing operations facilities at Olympic Dam comprise an underground mine, and a mineral processing plant and associated infrastructure which would be expanded to support expanded mining. Major items of infrastructure could include a new powerline, water pipeline and associated coastal desalination plant, a rail link to Olympic Dam from the existing national network and further development of the Roxby Downs township (current population 4,000). The operation is regulated by an Indenture Agreement with the South Australian Government. To enable the expansion to proceed, the Indenture Agreement will be renegotiated. The operation is also regulated by the Federal Government. An Environmental Impact Statement is being developed to secure the necessary State and Federal approvals. A land access agreement is being negotiated with indigenous groups. Plans for

  11. PRODUCTIVITY COMPARISON BETWEEN BOER AND KACANG GOAT DAM

    Directory of Open Access Journals (Sweden)

    S. Elieser

    2014-10-01

    Full Text Available A study to evaluate the productivity of Boer and Kacang goats dam was carried out for 2 years atResearch Institute for Goat Production, Sungei Putih-North Sumatera. The materials used were goatsowned by the institute. The parameters observed were total birth and weaning weights of kid, litter size,parity of dam, pre-weaning mortality and kidding interval. The rate of reproduction and productivity ofthe dam were estimated using Amir and Knipscheer methods and were statistically analyzed usingGeneral Linear Model. The results showed that the total birth and weaning weight of Boer goats werehigher (P<0.05 than that of Kacang goats, while litter size of Boer goats were higher (P<0.05 than thatof Kacang goats. The pre-weaning mortality of Boer goat 15.1 ± 6.02% was lower than that ofKacang. The kidding interval of Boer goats was higher (P<0.05 than that of Kacang. Parity of dam hadsignificant effect on all production traits (P<0.05 except for pre-weaning mortality. Dam reproductionrate of Boer (1.81 was higher than that of Kacang (1.78, while productivity of Boer goat (37.12kg/head/year was higher than that of Kacang (18.12. It can be concluded that the reproductivity ofBoer and Kacang goats were similar, however the productivity of Boer goat had better than Kacang.

  12. Linking Three Gorges Dam and downstream hydrological regimes along the Yangtze River, China

    NARCIS (Netherlands)

    Mei, X.; Dai, Z.; Van Gelder, P.H.A.J.M.; Gao, J.

    2015-01-01

    The magnitude of anthropogenic influence, especially dam regulation, on hydrological system is of scientific and practical value for large river management. As the largest dam in the world by far, Three Gorges Dam (TGD) is expected to be a strong evidence on dam impacts on downstream hydrological

  13. Freshwater mussel survey for the Columbia Dam removal, Paulins Kill, New Jersey

    Science.gov (United States)

    Galbraith, Heather S.; Blakeslee, Carrie J.; Cole, Jeffrey C.; Silldorff, Erik L.

    2018-06-04

    Semi-quantitative mussel surveys, conducted by the U.S. Geological Survey and the Delaware Riverkeeper Network in cooperation with The Nature Conservancy, were completed in the vicinity of the Columbia Dam, on the Paulins Kill, New Jersey, in August 2017 in order to document the mussel species composition and relative abundance prior to removal of the dam. Surveys were conducted from the Brugler Road Bridge downriver approximately 2,000 meters (m) to the Columbia Dam and downriver from the dam about 300 m to 75 m upriver from the confluence of the Paulins Kill with the Delaware River. Sixteen sections (average length=175 m) were surveyed by personnel snorkeling or SCUBA diving; 13 sections were upriver from the dam, and 3 were downriver from the dam. Mussels, as they were encountered by surveyors, were removed from the sediment, immediately identified to species, and replaced in their original collection locations. Habitat data were collected for each surveyed section. Upriver and downriver from the dam, river margins with dense vegetation were examined for mussels by personnel using snorkels in transects (approximately 25 meters) perpendicular to river flow every 50 m on both sides of the river. Only two species were found upriver from the dam, and those were present in relatively low numbers. Catch per unit effort is reported here within parentheses as the average across upriver sections in number of mussels per person hour of survey time: 42 Elliptio complanata (2.6) and 1 Pyganodon cataracta (0.1) were found upriver from the dam. No mussels were found in the dense vegetation either upriver or downriver of the dam by surveyors using snorkels. Significantly higher species richness and mussel catch per unit effort were found downriver from the dam than upriver, including 106 E. complanta (32.5), 27 Utterbackiana implicata (8.2), 1 Alasmidonta undulata (0.4), 2 Lampsilis cariosa (0.5), 6 Lampsilis radiata (2.1), 4 P. cataracta (1.1), and 1 Strophitus undulatus (0

  14. Variability of Ecosystem State in Rivers Containing Natural Dams: A Chemical Analysis

    Science.gov (United States)

    Reynolds, Z. A.

    2015-12-01

    Flooding, and the resulting economic damage to roads and property, is associated with natural dams such as beaver dams or log jams. For this reason, humans often remove natural dams; however, river reaches with natural dams provide very different ecosystem services in comparison with free-flowing river reaches. Therefore, the goal of this project is to assess the differences in ecosystem state between these different river reach types in the northeastern United States. We focused on differences in basic chemistry (e.g., dissolved oxygen, pH, temperature, and organic carbon) to assess the impact of natural dams on river ecosystem state. Study sites include rivers in the White Mountains and southeastern New Hampshire at locations with beaver dams, beaver ponds, beaver meadows, log jams, and free-flowing reaches. Dissolved oxygen, ORP, pH, temperature, and conductivity were measured in the field with a YSI Professional Plus meter. Water samples were collected for subsequent laboratory analysis of total organic carbon with a Shimadzu TOC-L. Preliminary results show that the chemistry of river water varies with feature type. Most significantly, dissolved oxygen concentrations are highest in free-flowing reaches and lowest in beaver ponds. Although beaver ponds are often associated with lower pH, due the increased concentration of organic acids, some beaver ponds can increase pH when compared to free-flowing reaches on the same river. Early results also show that water chemistry returns quickly to the chemistry typical of the free-flowing river reaches after being altered by a natural dam. Overall, natural dams create a river system that has more heterogeneity, and therefore has opportunities to provide more ecosystem functions, than a purely free-flowing river; this can increase the number of supported instream and riparian species. By increasing the understanding of how natural dams affect the chemistry of river water, river engineers can improve their decisions on how

  15. Risk assessment of tailings facility dam failure

    OpenAIRE

    Hadzi-Nikolova, Marija; Mirakovski, Dejan; Stefanova, Violeta

    2011-01-01

    This paper presents the consequences of tailings facility dam failure and therefore the needs for its risk assessment. Tailings are fine-grained wastes of the mining industry, output as slurries, due to mixing with water during mineral processing. Tailings dams vary a lot as it is affected by: tailings characteristics and mill output, site characteristics as: topography, hydrology, geology, groundwater, seismicity and available material and disposal methods. The talings which accumulat...

  16. Geoelectrical Methods and Monitoring for Dam Safety Assessment, Republic of Korea

    Science.gov (United States)

    Lim, S. K.; Oldenburg, D.; Kang, S.; Song, S. H.

    2016-12-01

    Geoelectrical methods and monitoring to detect the seepage and internal erosion are essential for the safety assessment of earth dams. This work aims to develop improved methodologies to analyze the observed data and to monitor changes in seepage flow using direct current (DC) and self-potential (SP) methods. The seasonal variation of water level at dams causes a change in seepage and water saturation and hence alters the resistivity of the dam material. DC data are sensitive to water saturation and hence changes in saturation can be obtained by repeatedly measuring DC data. However, a more diagnostic parameter for safety assessment is fluid flow, and resistivity is only weakly coupled to that. Fortunately SP signals are directly related to fluid flow, and thus an SP survey has the potential to characterize fluid flow through the earth matrix. In Korea, the safety assessment of earth fill dams has been dealt by Korea Rural Community Corporation (KRC). Most of the dams are relatively old ( >50 years), hence assessing deterioration and corresponding seepage of those dams are crucial. In order to evaluate the engineering geological properties of the soil at earth dams in Korea, two boreholes in each dam were drilled to a bedrock depth that exceeds the height of the dam. A large set of field tests, including standard penetration tests (SPT) and in-situ permeability tests, were carried out along the boreholes. However, seepage paths in the dam is complex hence those limited measurements at a few points is not sufficient to delineate the zone of preferential seepage flow. For this, KRC developed permanent DC monitoring systems at a number of agricultural dams in Korea. The data were automatically collected every 6 hours. During the monitoring, the measurements of the water level at two boreholes were gathered at the same time. In this presentation we select an agricultural dam and delineate an anomalous leakage zone by inverting and interpreting time-lapse DC resistivity

  17. Evaluating the Mosul Dam's Instability after Resumption of Maintenance

    Science.gov (United States)

    Al-husseinawi, Y.; Li, Z.; Clarke, P. J.; Edwards, S.

    2017-12-01

    There is serious concern about the safety of Mosul dam in the north of Iraq. Millions of people in the downstream area are exposed to risk of catastrophic collapse of this dam due to its soluble foundation. Recent study (Milillo et al., 2016, Scientific Report/10.1038/srep37408) reported that the dam deformation has accelerated since August 2014, when grouting operations were interrupted due to the conflict in the region. In this study, we investigate the health of Mosul dam since Jun 2016 using three independent datasets: Sentinel-1A/B SAR images, levelling, and GPS measurement. The latter are based on three epochs of terrestrial observation for levelling and GPS data: March 2016, December 2016 and July 2017. During this period, maintenance operations are being recovered to keep the dam stable. The monitoring network, on which the levelling and GPS observations are based, consists of eighty-seven pillars distributed on the dam surface. The results from InSAR and leveling data show that the dam crest is settling by 9 mm/yr. In contrast to previous studies, our results show a deceleration in the settlement. This may be due to the maintenance operations performed in the last few months. InSAR time series analysis was performed using the in-house tool TM-SBAS. When using the small baseline Sentinel-1 constellation, all possibilities of image choice are taken into consideration and the SRTM DEM accuracy is sufficient to generate the differential interferograms. Data from both Sentinel-1A and -1B images are used, and these results can be compared with multi-platform (Envisat, Sentinel-1, Cosmo-SkyMed, and TerraSar-X) data collected during the period between March 2003 and September 2016.

  18. 5. decennial inspection of Tignes dam. Draining of the higher french dam; 5. inspection decennale du barrage de Tignes. Vidange du plus haut barrage de France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This document deals with the 5. decennial inspection of the Tignes dam. The Tignes dam has been drained to allow EDF and the public authorities to verify the dam wall, of 180 m high, in order to validate the next decade. The four steps of the drainage are described as the maintenance policy of such building. (A.L.B.)

  19. WAC Bennett Dam - the characterization of a crest sinkhole

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, R.A.; Gaffran, P.C. [British Columbia Hydro, Burnaby, BC (Canada); Watts, B.D. [Klohn-Crippen Consultants Ltd., Richmond, BC (Canada); Sobkowicz, J.C. [Thurber Engineering Ltd., Vancouver, BC (Canada); Kupper, A.G. [AGRA Earth and Environmental, Edmonton, AB (Canada)

    1998-11-01

    In June, 1996, a small hole was discovered in the asphaltic concrete road on the crest of the 183 m high WAC Bennett Dam on the Peace River in northeastern British Columbia. Examination of the hole resulted in a sinkhole on the dam crest. The sinkhole was 2.5 m in diameter and 7 m deep. Speculation was that the cavity was likely associated in some way with a buried survey benchmark tube. An investigation was immediately planned and executed to characterize the sinkhole, to determine the extent of damage and the safety status of this very large dam. British Columbia`s Dam Safety Regulator made the decision to lower the reservoir level. During the reservoir drawdown, various surface geophysical techniques were used to investigate the condition of the dam beyond the sinkholes. Intrusive investigations of the sinkhole were also planned. This involved trial drilling and downhole geophysical surveys in intact portions of the core at locations far from the sinkhole. The objectives and criteria developed for the investigation program are summarized. Scope of key activities at the sinkhole and important lessons learned during the investigation are also described. 9 refs., 15 figs.

  20. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam Report C, Annual Progress Report April 2003 - March 2004

    Science.gov (United States)

    Parsley, Michael J.; Gadomski, Dena M.; Kofoot, Pete

    2005-01-01

    River discharge and water temperatures that occurred during April through July 2003 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Although optimal spawning temperatures in the four tailraces occurred for less than two weeks, they coincided with a period of relatively high river discharge. Bottom-trawl sampling in Bonneville and The Dalles Reservoirs revealed the presence of young-of-the-year (YOY) white sturgeon in Bonneville Reservoir, but none were captured in The Dalles Reservoir. A comparison of five years of indices of abundance of YOY sturgeon from sampling done by ODFW with gillnets and the USGS with bottom trawls was completed. Despite obvious differences in gear sampling characteristics (e.g. one gear is actively fished, one passively fished), it appears that either gear can be used to assess relative trends in YOY white sturgeon abundance. The analyses suffered due to poor catches of YOY fish, as YOY were only captured in The Dalles Reservoir during three of the five years of comparison sampling, and during only one of four years in John Day Reservoir. However, both gears detected the presence or absence of YOY white sturgeon within a reservoir equally. That is, if any YOY white sturgeon were captured in any year in a reservoir, both gears captured at least one fish, and if one gear failed to collect any YOY white sturgeon, both gears failed. Concerns have been raised that the Wang et al. (1985) egg development relationships for Sacramento River white sturgeon may not be applicable to Columbia Basin stocks. However, using laboratory experiments with white sturgeon eggs incubated at 10, 12, 15, and 18o C, we found no significant differences in development rates of eggs of Columbia, Kootenai, Snake, and Sacramento river fish.