Melting in a cokeless cupola furnace fuelled with natural gas is a novel, energy-saving and environment-friendly process. In order to be able to monitor the processes inside the furnace with detailed mass and heat balances, an experimental furnace with an efficient measuring system was constructed in the framework of a research project financed by the BMFT and Messrs. Eisenwerke Dueker GmbH und Co. KG, Laufach, Germany. (orig./HS) [Deutsch] Das Schmelzen im kokslosen erdgasgefeuerten Kupolofen ist ein neues, energiesparendes und umweltfreundliches Verfahren. Um die Vorgaenge im Ofen mit umfassenden Stoff- und Waermebilanzen erfassen zu koennen, ist im Rahmen eines vom BMFT und der Firma Eisenwerke Dueker GmbH und Co. KG, Laufach, finanzierten Forschungsvorhabens, ein Versuchsofen mit umfangreicher Messeinrichtung gebaut worden. (orig./HS)
The invention concerns the conversion of steam turbines, particularly condensation turbines, for the economic coupling of process steam and heating steam. The conversion occurs by retaining the basic construction of foundations, housing and bearings as support group and coupling member and matching the specially developed construction for the idea of use into the existing housing, and inserting the rotor into the shaft unit. By having the unchanged supports of the housing and the bearings of the shaft unit, the elasticity in expansion and the vibration behaviour of the turbine are retained and the conversion costs can be lowered.
The Lowell Hydroelectric Project (Eldred L. Field) is a key feature of the Departments of Energy's National Low Head Hydroelectric Power Demonstration Program. This report summarizes the Project's Construction which began in October 1983 and was completed in November 1985. It also details projectconstruction costs.
Currently it can be observed that in the case of generator drives as well as 'mechanical drives' smaller units are demanded with a steam turbine capacity of up to 150 MW and clearly higher efficiencies. MAN TURBO is meeting the challenge through realisation of a comprehensive development project aiming at the extension of the application range of the current steam turbine series.
Project management mode plays a key role in projectconstruction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)
The generation of a defined swivel momentum in car door hinges depends on numerous constructional and technical manufacturing parameters. If these parameters and their influence are to be investigated, then in addition to detailed experiments with variations in the parameters, methods are also required which enable the measuring data produced to be assessed in such a way that, in general, the non-linear relationships between initial and target size can be described sufficiently accurately. This paper explains the parameter reduction necessary in the experimental investigation, gives the results of the data assessment with conventional statistical methods and describes in particular the use of artificial neural networks (ANN) to construct so-called 'neuro hinge models' on the basis of the data resulting from the experiments. Parameter variations can be simulated with the hinge models and in this way optimal ...
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
Gentilly 2, Point Lepreau, Cordoba and Wolsung are the first 600 MW CANDU nuclear generating stations to be built. Progress in their construction and in the remaining design work for these stations is discussed. (LL).
The goal of this effort Composability, Provability, Reusability (CPR) for Survivability is to address the problem of composition of survivable systems. The particular objective of this project is to construct a formal specification of the Java Virtual Mac...
Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting the joint project integrating both the Neutron Science Project (NSP) of JAERI and the Japan Hadron Facility Project (JHF) of KEK for comprehensive studies on basic science and technology using high-intensity proton accelerator. This document describes the joint project prepared by the Joint Project Team of JAERI and KEK to construct accelerators and research facilities necessary both for the NSP and the JHF at the site of JAERI Tokai Establishment. It was originally written in English and translated into Japanese with some corrections. (author)
Energy savings performance contracting (ESPC) is now receiving greater attention as a means of implementing large-scale energy conservation projects in housing. Opportunities for such projects exist for military housing, federally subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers), to name a few. Accurate prior (to construction) estimates of the energy savings in these projects reduce risk, decrease financing costs, and help avoid post-construction disputes over performance contract baseline adjustments. This paper demonstrates an improved method of estimating energy savings before construction takes place. Using an engineering model calibrated to pre-construction energy-use data collected in the field, this method is able to predict actual energy savings to a high degree of accuracy. This is ...
Energy savings performance contracting (ESPC) is now receiving greater attention as a means of implementing large-scale energy conservation projects in housing. Opportunities for such projects exist for military housing, federally subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers), to name a few. Accurate prior (to construction) estimates of the energy savings in these projects reduce risk, decrease financing costs, and help avoid post-construction disputes over performance contract baseline adjustments. This paper demonstrates an improved method of estimating energy savings before construction takes place. Using an engineering model calibrated to pre-construction energy-use data collected in the field, this method is able to predict actual energy savings to a high degree of accuracy. This is ...
Liberalisation of the energy market will lead to enhanced use of environment-friendly, high-efficiency combined-cycle power stations - a great challenge to steam turbine producers. In this highly competitive market, advanced technology and interesting technical features are key issues. MAN Turbomaschinen AG GHH BORSIG, Oberhausen and Berlin, have been producers of steam turbines since 1905. Performance optimisation is the main aspect of development today. [German] Die jetzt eingeleitete Liberalisierung des Energiemarktes wird in der Zukunft den verstaerkten Einsatz von neuen umweltfreundlichen und zugleich hoch effizienten Kombikraftwerken notwendig machen. Eine grosse Herausforderung an fuehrende Hersteller modernster Dampfturbinen. Eine ausgereifte Technik sowie technische Alleinstellungsmerkmale sind im heutigen Verdraengungswettbewerb eine Voraussetzung bei Industriedampfturbinen. Seit dem Jahre 1904 baut die MAN Turbomaschinen AG GHH BORSIG, Oberhausen und Berlin, Dampfturbinen, ...
In two pilot projects Maingas AG has complemented an existing marketing mix with a telephone marketing segment. One of these telephone marketing campaigns was conducted for the purpose of `Intensification`, the other for `Activation of Unused Mains Connections`. The aim was to provide professional support to canvassing campaigns in their various phases in order to minimise diffusion losses and increase the probability of winning new customers. The slogan chosen for the drive was therefore: `Its no good being present unless one`s efficient in the preparation, execution, and revision of a campaign`. (orig.) [Deutsch] Die Maingas AG hat in zwei Pilotprojekten das bestehende Marketing-Mix durch das Segment Telefonmarketing ergaenzt. Es wurde eine Telefonmarketing-Aktion im Bereich `Verdichtung` und eine Telefonmarketing-Aktion im Bereich `Aktivierung Inaktive Hausanschluesse` durchgefuehrt. Ziel war es, durch einen professionellen flankierenden Service in den ...
Fuel cells can make an important contribution to ecologically acceptable energy supply. There are many pilot projects in the 1 W to 1 MW range. Especially the motor car industry is quite interested, and a breakthrough seems to be in sight. The second part of this series discusses the physical and chemical fundamentals of the fuel cell, the function of the electrolyte and catalyst, and the functional principle. (orig.) [German] Brennstoffzellen koennen bei der Riesenaufgabe, den weiter wachsenden Energiebedarf oekologisch vertraeglicher als bisher zu decken, einen wichtigen Beitrag leisten. Bis heute (2004) gibt es zahllose Pilotprojekte im Leistungsbereich 1 W bis ueber 1 MW, die die Alltagstauglichkeit der BZ beweisen. Verschiedenste Branchen - vor allem auch die Automobilindustrie - zeigen grosses Interesse fuer kommerzielle Anwendungen. Die Brennstoffzelle als effizienter Energiewandler, scheint vor dem Durchbruch zu stehen. Der zweite Teil befasst sich mit den ...
Daya Bay Nuclear Power Station is the largest joint-venture project which is also the largest commercial nuclear power plant currently under construction in China mainland. Organized and executed strictly in accordance with international standards, the Daya Bay project is seen as the first step taken by China in the development programme of large-capacity commercial nuclear power units.
As part of three ongoing research projects, the Gas Research Institute (GRI) is studying the natural gas industry`s impacts on wetlands and how to manage operations so that impacts can be minimized or eliminated. The objective of the first project is to gain a better understanding of the causes and processes of wetland loss in the Louisiana deltaic plain and what role gas pipeline canals play in wetland loss. On the basis of information gathered from the first projects, management and mitigation implications for pipeline construction and maintenance will be evaluated. The objective of the second project is to assess the floral and faunal communities on existing rights-of-way (ROWs) that pass through numerous types of wetlands across the United States. The emphasis of the project is on pipelines that were installed within the past five years. The objective of the ...
Variability in production is one of the largest factors that negatively impacts constructionproject performance. A common construction practice to protect production systems from variability is the use of buffers (Bf). Construction practitioners and researchers have proposed buffering approaches for different production situations, but these approaches have faced practical limitations in their application. A multiobjective analytic model (MAM) is proposed to develop a graphical solution for the design of Work-In-Process (WIP) Bf in order to overcome these practical limitations to Bf application, being demonstrated through the scheduling of repetitive building projects. Multiobjective analytic modeling is based on Simulation?Optimization (SO) modeling and Pareto Fronts concepts. Simulation...
In the year 1996 the spheres of competence of several DLR-Institutes working in the areas of fluid dynamics, reaction kinetics, combustion, numerical methods and laser measuring techniques have been brought together while contributing to the internal DLR project 'combustion chamber modelling (BKM)', in order to proceed with the computational simulation of combustion processes in combustion chambers of gas turbines. The main issue was the development of a research code for numerical simulation of fluid flow in real combustion chambers. Here the development of computational models of physical and chemical processes was emphasized, among other processes the formation of soot was treated. Moreover, a worldwide outstanding database of measured data for the purpose of code validation has been created within the framework of the BKM project using the laboratory facilities of the DLR, which are in Germany unique for the experimental ...
KEPCO (Korean Electric Power Corp.) with the support of AECL and other Korean and Canadian subcontractors has created a strong multi-company team to execute design and construction of the Wolsung-2 CANDU 6 power plant. Key concepts of the project team are: 1. KEPCO is the project manager, and AECL is the major engineering and supply contractor; 2. Significant participation by Korean companies in design work in Canada and Korea; 3. Significant manufacturing in both Canada and Korea; 4. Construction by Korean contractors. Key concepts of the Wolsung 2 design are: 1. Evolutionary improvement of the Wolsung-1 plant which balances proven technology and necessary design improvements including current codes and standards. 2. Sharing some structures with the Wolsung-1 plant. This paper describes the successful establishment and operation of the complex project interfaces along with the ...
We have constructed a deletion-mutant rabies virus encoding EGFP and find it to be an excellent tool for studying detailed morphology and physiology of neurons projecting to injection sites...Full Text Available
Vegetable oils such as soybean oil will be converted to novel polymers using hydroformylation and other catalytic processes. These polymers can be used in the construction, automotive, packaging, and electronic sectors.
There are several on-going projects of e"+e"- colliders. If they are constructed, we can convert them into photon-photon (#gamma#-#gamma#) colliders by converting electron beams into #gamma# beams, irradiating laser beams just before the interaction point. In this report we discuss the technical issues on the accelerator.
When constructing new high-voltage transmission lines landscape aspects play a more and more important role. The project described is particularly interesting as it demonstrates that it is possible to find acceptable solutions for everyone if all partners are prepared to make concessions. The article also describes a new concept for the connection of concrete tower elements. (orig.).
The Large Hadron Collider (LHC) project, approved by the CERN Council in December 1994, has now fully entered its construction phase, with the detailed technical definition of the major systems, and the adjudication of a number of large procurement contracts. We first recall the main features and characteristics of the LHC, report on the advances in definition of the layout and optics as well as on preparation of the injector complex, and review recent progress in the key technical systems of the main ring: magnets, cryogenics and vacuum, as well as civil construction, which has started following acceptance by authorities in the Host States.
In the construction work for the Unit No.5 Turbine Building at Hamaoka Nuclear Power Station, the collaboration work for the planning and the coordination of the building construction and the machinery installation was carried out utilizing three-dimensional computer aided design (3D CAD) information. It was the first time in Japan for a building constructor and a plant manufacturer to work together, exchanging 3D CAD data of the whole building and adjusting the construction schedule. It was made possible to confirm the correspondence concerning the planning of both companies from the primary stage of the project by the total process simulation and to adjust on-going work precisely by the partial process simulation.
In the construction work for the Unit No.5 Turbine Building at Hamaoka Nuclear Power Station, the collaboration work for the planning and the coordination of the building construction and the machinery installation was carried out utilizing three-dimensional computer aided design (3D CAD) information. It was the first time in Japan for a building constructor and a plant manufacturer to work together, exchanging 3D CAD data of the whole building and adjusting the construction schedule. It was made possible to confirm the correspondence concerning the planning of both companies from the primary stage of the project by the total process simulation and to adjust on-going work precisely by the partial process simulation.
Currently the construction of small-scale hydroelectric and pumped storage plants is booming in the USA. The technology is attractive because of its relatively cheap construction methods and operation. Electric utilities are seeing it as a viable source of peaking power and a means of system regulation. Two schemes are described. One is a high-head/small flow river project designed to generate 3.5 MW and is about to come on line having overcome tight environmental and commercial constraints. The second is a pumped-storage project using two man-made reservoirs with an average elevation difference of 1280 ft. It is deemed to be of minimum environmental impact construction and good physical characteristics. Completion is hoped for by 1995 and the plant will deliver 1000 MW. (UK)
In accordance with federal legislation, the U.S. Department of Energy (DOE) has conducted a project to demonstrate use of its Energy Conservation Voluntary Performance Standards for Commercial and Multi-Family High-Rise Residential Buildings; Mandatory for New Federal Buildings; Interim Rule (referred to in this report as DOE-1993). A key requisite of the legislation requires DOE to develop commercial building energy standards that are cost effective. During the demonstration project, DOE specifically addressed this issue by assessing the impacts of the standards on (1) construction costs, (2) builders (and especially small builders) of multi-family, high-rise buildings, and (3) the ability of low-to moderate-income persons to purchase or rent units in such buildings. This document reports on this project.
The Mizunami Underground Research Laboratory (MIU) of the Japan Atomic Energy Agency is a major site for geoscientific research to advance the scientific and technological basis for geological disposal of high-level radioactive waste in crystalline rock. Studies on relevant engineering technologies in the MIU consist of a) research on design and construction technology for very deep underground applications, and b) research on engineering technology as a basis of geological disposal. In the Second Phase of the MIU project (the construction phase), engineering studies have focused on research into design and construction technologies for deep underground. The main subjects in the study of very deep underground structures consist of the following: 'Demonstration of the design methodology', 'Demonstration of existing and supplementary excavation methods', 'Demonstration of countermeasures during ...
This paper described a risk control management tool that has been developed by Petrobras Petroleo, the largest Brazilian oil company and one of the world's leading oil companies. The system covers health, safety and environmental (HSE) issues regarding pipeline constructionprojects. The limitations of traditional safety management systems for coping with the critical problems related to environmental safety issues were discussed. In particular, this paper described how the HSE tool evaluates the risks resulting from the following aspects of onshore pipeline construction and assembly: establishing right-of-way and route locations, transporting pipe, developing the construction site, opening the trench, pipe laying, pipe bending, concrete external coating, welding, external anticorrosive coatings, pipe placement backfilling, hydrostatic testing, maintenance operations, and pipeline ...
This report completes the documentation for the research project 'High Pressure Compressor - Preliminary Design as Basis for the Development of an Efficient and Environmentally Friendly Core Engine' which was funded by the Ministry of Economics of State Brandenburg. The objective of the project is to deliver a preliminary compressor aerodynamic design as well as design studies for an efficient, weight and cost improved compressor. The increase of stage pressure ratio and improved efficiency, whilst stage and blade count is reduced, has been achieved by advanced 3D methods. Compressor stability also at off-design conditions will be retained. The mechanical design focusses on a cost and weight optimised rotor not only for a conventional bladed discs but also for Blish stages. Various options for split casings have been developed and assessed. Alternative vortex reducers based on different design options have been carried out. ...
As an alternative to the usual way of installing wind machines in extended windfarms new concepts are being developed. Several wind turbines are affixed to one support structure and can be aligned together. Drafts of steel constructions developed by students in three diploma theses are presented. The attempt to transform existing design standards requires extensive discussion of possible influence scenarios. Several concepts regarding structure and safety elements are described and evaluated. The design of the support structure is to be seen as a first step to the practicability of the whole concept. A preliminary mass calculation and a specification of further cost factors facilitates the comparison to conventional wind power stations. (orig.) [Deutsch] Als Alternative zur ueblichen Praxis, Windenergieanlagen in Form grossflaechiger Windparks zu bauen, werden Konzepte entwickelt, bei denen mehrere Konverter an einem Tragwerk angeordnet und gemeinsam in den Wind ...
As part of three ongoing research projects, the Gas Research Institute (GRI) is studying the natural gas industry's impacts on wetlands and how to manage operations so that impacts can be minimized or eliminated. The objective of the first project is to gain a better understanding of the causes and processes of wetland loss in the Louisiana deltaic plain and what role gas pipeline canals play in wetland loss. On the basis of information gathered from the first projects, management and mitigation implications for pipeline construction and maintenance will be evaluated. The objective of the second project is to assess the floral and faunal communities on existing rights-of-way (ROWs) that pass through numerous types of wetlands across the United States. The emphasis of the project is on pipelines that were installed within the past five years. The ...
The Fifteenmile Basin Habitat Improvement Project is an ongoing multi-agency effort to improve habitat in the Fifteenmile drainage and increase production of the depressed wild, winter steelhead run. Cooperating agencies include the Oregon Department of Fish and Wildlife, USDA Forest Service. USDA Soil Conservation Service and Bonneville Power Administration. in consultation with the Confederated Tribes of Warm Springs. The Oregon Department of Fish and Wildlife is administering project work on state and private lands and the U.S.D.A. Forest Service is administering project work on National Forest land. Project work on the Forest has been sub-divided into four components; (1) Ramsey Creek, (2) Eightmile Creek, (3) Fifteenmile Creek, and (4) Fivemile Creek. Forest Service activities in the Fifteenmile basin during 1988 involved habitat improvement work on Ramsey Creek, continuation of physical and ...
The funding for a coal-liquefaction demonstration plant near Morgantown, W.Va., appears more certain since Japan has committed $175 million toward the project. West Germany has already signed a memorandum of understanding to contribute 25% of the expected $700 million cost. West Virginia Governor J. Rockefeller has said that he feels sure the Carter Administration will approve the project since half the money is assured. The solvent-refined-coal (SRC) demonstration program began in July 1978 with the award of two separate multiphased contracts for development of a solid process, SRC-I, and a liquid process, SRC-II. The US Department of Energy is expected to choose one of the projects for detailed design and construction by the end of fiscal 1979.
Work on the coke oven gas cleaning demonstration project (CCT-11) this quarter has focused on Phase IIB tasks, and include engineering, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. The project Milestone Schedule and Log is shown. Planned Baseline Supplemental Monitoring activities described in the Environmental Monitoring Plan were completed. Testing of the mechanical systems began in June, 1991. The cold commissioning date has been moved back from October 1, 1991 to November 1, 1991 to allow float for miscellaneous finish-up items beyond the electrical contractor`s projected completion date of October 31, 1991.
The staring point of the project was to design and construct, by taking the silvicultural point of view into account, a harvesting and processing system especially for energy-wood, containing manually driven bundling harvester, automatizing of the harvester, and automatized loading. The equipment forms an ideal method for entrepreneur`s-line harvesting. The target is to apply the system also for owner`s-line harvesting. The profitability of the system promotes the utilization of the system in both cases. The objectives of the project were: to construct a test equipment and prototypes for all the project stages, to carry out terrain and strain tests in order to examine the usability and durability, as well as the capacity of the machine, to test the applicability of the Eko-Log system in simultaneous harvesting of energy and pulp woods, and to start the marketing and manufacturing of ...
The EMP consists of a Compliance Monitoring Sampling Program and a Supplemental monitoring Sampling Program. The Compliance Monitoring Sampling Program will be conducted during a summer and a winter Baseline periods during the Pre-Construction/Construction phases of the Project and during a summer and a winter period following the successful Startup and Operational phase of the completed Project. compliance monitoring consist of conducting all the sampling and observation programs associated with existing required Federal, State, and Local Regulations, Permits and Orders. These include air, water, and waste monitoring and OSHA and NESHAP monitoring. The Supplemental Monitoring Program will also be conducted during a summer and a winter Baseline periods during the Pre-Construction/Construction phases of the Demonstration Facility and during a summer and a winter period following the successful startup ...
The EMP consists of a Compliance Monitoring Sampling Program and a Supplemental monitoring Sampling Program. The Compliance Monitoring Sampling Program will be conducted during a summer and a winter Baseline periods during the Pre-Construction/Construction phases of the Project and during a summer and a winter period following the successful Startup and Operational phase of the completed Project. compliance monitoring consist of conducting all the sampling and observation programs associated with existing required Federal, State, and Local Regulations, Permits and Orders. These include air, water, and waste monitoring and OSHA and NESHAP monitoring. The Supplemental Monitoring Program will also be conducted during a summer and a winter Baseline periods during the Pre-Construction/Construction phases of the Demonstration Facility and during a summer and a winter period following the successful startup ...
About 25 years after the last edification of a new large high voltage institute at Technical University of Karlsruhe and about 10 years afte the edification of the test lab at Kaiserslautern University, the Brandenburg Technical University of Cottbus had the opportunity to design new high voltage test facilities from the very beginning on and to realize it in a very short time. To review the project from the first ideas followed by the planning and realization phase and the final commissioning of the technical equipment, this book should be a contribution to spred the experiences made among interested people and to demonstrate the actual technical possibilities. To ensure an international exchange of these experiences, all co-authors to the trouble to translate their participation's also to the English language. (orig.) [German] Etwa 25 Jahre nach dem letzten grossen hochspannungstechnischen Institutsneubau in der deutschen Hochschullandschaft an der TH ...
This report presents a general investigation of the transport requirements associated with the construction and operation of conceptual fusion reactors. Projections of amounts of construction and operating materials requiring transportation are presented for several proposed designs. The material to be shipped is described along with the shipping containers that might be used, the transport modes and the expected impact of transporting these materials. Transportation of both radioactive and nonradioactive materials will be required. Most of these materials are routinely shipped by the transportation industry. Transportation requirements of a representative fusion reactor are also compared with Liquid Metal Fast Breeder Reactor (LMFBR) requirements.
Progress in the construction of Candu reactors at home and abroad is surveyed. Some A.E.C.L. research projects are also mentioned. During 1979, Candu reactors again showed their superior capacity factors, four of them being among the ten most reliable reactors in the world. Progress in construction at Pickering B, Bruce B, Point Lepreau, Gentilly-2, Darlington, Wolsung (Korea), Cordoba (Argentina), and Cernavoda (Romania) is recounted. In 1979, it was unfortunately necessary to replace installed steam generators at Pickering B, Bruce B, Point Lepreau and Gentilly-2. At Wolsung, the reactor was pre-assembled before installation, which is a new technique. (N.D.H.).
The design, construction and operation of a pilot plant are often important stages in the development of a project for the production of uranium concentrates. Since building and operating a pilot plant is very costly and may not always be required, it is important that such a plant be built only after several prerequisites have been met. The main purpose of this guidebook is to discuss the objectives of a pilot plant and its proper role in the overall project. Given the wide range of conditions under which a pilot plant may be designed and operated, it is not possible to provide specific details. Instead, this book discusses the rationale for a pilot plant and provides guidelines with suggested solutions for a variety of problems that may be encountered. This guidebook is part of a series of Technical Reports on uranium ore processing being prepared by the IAEA's Division of Nuclear Fuel Cycle and Waste Management. 42 refs, ...
The overall aim is to develope programme modules for a Danish integrated computer system for projecting buildings and to ensure that Danish programmes are compatible with international systems. The programmes to be integrated here were AutoCAD and SCRIBE-Models and the simulation programme tsbi3 for the calculation of indoor climate conditions, power demand and energy consumption in buildings. For the calculation of humidity and temperature conditions in constructions a certain amount of integration is carried out with the MATCH programme (Moisture And Temperature calculations for Constructions of Hygroscopic materials). The activities embodied in the pilot projects are described in this working report in addition to individual computer programmes and prototypes, and examples and diagrams are presented. The programmes described deal with handling design elements in relation to AutoCAD designs, and the ...
Work on this coke oven gas cleaning demonstration project (CCT-II) this quarter has been focused on Phase IIB tasks, and include engineering, procurement, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. Engineering efforts are nearly complete. Remaining to be finalized is an assessment of electrical heat tracing/insulation needs for pipe lines, assessment of fire protection requirements, and instrument modifications. Procurement of all major equipment items is complete, except for possible additions to fire fighting capabilities. Major focus is on expediting pipe and structural steel to the project site. Civil construction is complete except for minor pads and bases as required for pipe supports, etc. Erection of the hydrogen sulfide and ammonia scrubber vessels is complete. ...
All of the project work since the previous report has been on Phase 2B tasks. Therefore, this quarterly progress report summarizes the period's activities in Engineering, Procurement and Civil Construction. Engineering is 95% complete, but revisions and changes are still being incorporated particularly in the Instrument and Electrical areas. Procurement has only valves 4 in. and above yet to order to complete all major items purchased. The scheduled material curve was based on the original estimate of the job. The projected curve reflects the previous month's estimate. Construction of civil work is proceeding according to schedule in the field. The initial bid packages for the Mechanical General Contractor portion of the work have been reviewed and evaluated. Order placement is scheduled for the end of July. The Electrical package is due back from the bidders on July 6. It requires ...
GAO's review of the H-Coal and Exxon projects showed inadequacies in DOE's contracting practices and a failure by DOE to properly plan, manage, and monitor, especially the H-Coal project. The initial Government-industry H-Coal agreements regarding the level of investment by private sponsors and the ceilings imposed on sharing in cost growth were imbalanced. Larger investments by private sponsors and sharing of cost growth provides an incentive to private sponsors to control costs and helps to assure that each party is fully committed to the success of the project. DOE started the H-Coal project prematurely before sufficiently detailed designs were available and without adequate project planning for functions such as construction scheduling, materials handling, inventory systems, and quality control. DOE staffing was inadequate at both ...
Although not Pakistan`s first independent power project, the 586 MW Uch plant is certainly one of the country`s most important. It is the first gas-fired combined cycle plant to be developed under Pakistan`s Private Power Policy, and uses low heating value natural gas previously thought worthless. The project also features some innovative financing arrangements, and with construction now at an advanced stage, it promises to kick-start the development of private power in Pakistan. (Author)
This paper explores how an aid-funded Ph.D.-programme in mathematics education instituted in some Southern African Development Community countries measures up to issues related to research capacity development projects. The research capacity development programme is described and reflected against mutual benefit, relevance, sustainability and prioritization of the location of project funding expenditure--some of the constructs in the discourse on research capacity development initiatives. It is found that the benefits of the programme are indeed mutual; the outcomes regarding relevance and sustainability are more uncertain and the location of expenditure of the funding is not overtly in favour of the donor country.
This work develops and demonstrates a laboratory-scale high temperature natural gas furnace that can operate with/without oxygen enrichment to significantly improve energy efficiency and reduce emissions. The laboratory-scale is 5ft in diameter & 8ft tall. This furnace was constructed and tested. This report demonstrates the efficiency and pollutant prevention capabilities of this test furnace. The project also developed optical detection technology to control the furnace output.
The Asejire dam at Ibadan, Nigeria was constructed in the late sixties for the purpose of providing water for the city of Ibadan (presently about 4,5 million inhabitants). It is located on the Oshun river approximately fifteen miles from the city. In 1982 cracks were observed on the wing walls and although these continued to develop, no attempt was made at that time to investigate their causes and no repair was carried out. In 1989 the SGI ENGINEERING Group of Geneva, Switzerland was appointed as the consultant for the complete refurbishment of the Asejire water scheme. The consortium Degremont-Poat-Clemessy was awarded the contract for the project. The African Development Bank and the Nigerian Government have provided the loan to finance the project.
After an international ideas competition by TNC Switzerland and Germany in 1996, six companies where given the opportunity to construct a prototype of their newly developed integrated PV-sound barrier concepts. The main goal was to develop highly integrated concepts, allowing the reduction of PV sound barrier systems costs, as well as the demonstration of specific concepts for different noise situations. This project is strongly correlated with a German project. Three of the concepts of the competition are demonstrated along a highway near Munich, constructed in 1997. The three Swiss installations had to be constructed at different locations, reflecting three typical situations for sound barriers. The first Swiss installation was the world first Bi-facial PV-sound barrier. It was built on a highway bridge at Wallisellen-Aubrugg in 1997. The operational experience of the installation ...
Embracing the notion of going green, an affluent school district in Pennsylvania spent $83 million as part of the high school's renovation and expansion project. The three-level addition is now equipped with self-dimming lights, energy-efficient windows, a rooftop solar water heater, and a geothermal cooling and heating system. As a bonus for going green, the school district received a $250,000 grant from the Pennsylvania Department of Environmental Protection. The district used that money to create an information center in the lobby of the building where a touch-screen computer provides students, staff, and visitors with data related to the operation of the school's energy-efficient water and electrical systems. The system will graphically depict utility use over the course of a year. The monitoring system and touch-screen computer can turn this school into a living lab, with science, math, and economics teachers using the data as teaching tools within classrooms. ...
A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of ''passive'' Advanced Light Water Reactors. The effects of aerosols that may result from hypothetical severe accidents are also considered. The construction of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA, has been completed. First steady-state tests have been performed on PANDA. The other facilities are now in their commissioning phases. Scaling studies have guided the design of the experimental facilities. Several small-scale experimental and studies have already produced valuable results which can be used to direct the experimental work, as well as the design of the passive ALWRs. (author). 23 refs, 6 figs.
This comprehensive final report for the Swiss Federal Office of Energy (SFOE) presents the results of research done in the third phase of a research project that investigated components for small heat pump systems that use ammonia as a working fluid. The report includes a summary of the findings of the first two phases of the project and goes on to describe tests done with rotary vane and scroll compressors. The aims of the project are discussed and the work done is listed chronologically. The construction and the components of the test installation are described in detail. Also, the heat pump testing facilities at the University of Applied Science in Rapperswil, Switzerland, are described. The results of the measurements made for various temperature gradients are presented in detail and commented on; also, the various types of compressor tested and other heat pump compressors are compared.
The goal of this project is to demonstrate that, by combining state-of-the-art technology, highly efficient plant operation and maintenance capabilities and by-product gypsum sales, significant reductions of SO{sub 2} emissions can be achieved at approximately one-half the life cycle cost of a conventional Flue Gas Desulfurization (FGD) system. Further, this emission reduction is achieved without generating solid waste and while minimizing liquid wastewater effluent. Basically, this project entails the design, construction and operation of a nominal 600 MWe AFGD facility to remove SO{sub 2} from coal-fired power plant flue gas at the Northern Indiana Public Service Company`s Bailly Generating Station.
This project analyzes Nordic trends in the development and industrial uptake of green nanotechno-logy in construction. The project applies an evolutionary economic perspective in analyzing the innovation dynamics and firm strategies in the window value chains in three Nordic countries, Denmark, Finland and Sweden. Hence the project investigates two pervasive parallel market trends: The emergence of the green market and the emergence of nanotechnology. The analysis investigates how a traditional economic sector such as the construction sector reacts to such major trends. Conclusions are multiple, but among the most important are: Eco-innovation has become the perhaps most important driver for innovation in the construction sector. Search into eco-innovative business opportunities is intense among all companies along the three analyzed Nordic window chains. While ...
The Wolsung-1 CANDU 600 MWe plant is now in operation. This paper provides an update on the design, construction and commissioning progress reported at last year's conference. The accomplishments of the past year are highlighted with emphasis on how the station has been commissioned in preparation for commercial service and on the skills that were dedicated to the completion of the project. The paper also deals with some of the features of the CANDU 600 MWe Nuclear Power Plant that make it viable for export.
Volume one contains calculations for: embankment design--embankment material properties; Union Carbide site--bedrock contours; vicinity properties--origin of contamination; North Continent and Union Carbide sites contaminated materials--excavation quantities; and demolition debris--quantity estimate.
Volume four contains calculations for: Borrow areas--site evaluation; temporary facilities--material quantities; embankment quantities--excavation and cover materials; Burro Canyon site excavation quantities--rippable and unrippable materials; site restoration--earthwork quantities and seeding; and bid schedule quantities and material balance.
In Germany, the oil crisis of 1979 initiated a revival of coal liquefaction technologies which had already seen industrial-scale application in the early 1940s. The paper describes various coal liquefaction research projects carried out and pilot plants constructed in Germany since then. 18 figs., 1 tab.
This environmental review of right-of-way clearing for transmission projects has been undertaken by the Environmental Analysis Branch for the Division of Land Resources in BPA's Office of Engineering and Construction. It is intended to review the present practices and results of selective clearing, and to make recommendations toward improvements in environmental practices and procedures in mitigation development for impacts associated with right-of-way clearing. 29 figs.
In connection with the ERP project 'Dynamic modelling of staged gasification processes' a gasification simulator has been constructed. The simulator consists of: a mathematical model of the gasification process developed at Technical University of Denmark, a user interface programme, IGSS, and a communication interface between the two programmes. (BA)
In view of the widespread cracks discovered in the reinforced-concrete circulating water culvert of Daya Bay Nuclear Power Station, cause analysis for the cracks is made in terms of construction and design. It is concluded that the cracks mainly resulted from shrinkage and temperature. Corresponding countermeasures are put forward thereafter for reference of similar projects
This report describes the work carried out to analyze and design a circuit for use in 1200 kV gas insulated substations. The first part of the project was devoted to a thorough analysis of the requirements for the circuit breaker from the standpoint of the electrical system in which it would operate. A conceptual design was selected and all of the components of the circuit breaker were designed, modeled and verified. Finally a plan was prepared for the construction of a complete circuit breaker.
There are several on-going projects of e{sup +}e{sup -} colliders. If they are constructed, we can convert them into photon-photon ({gamma}-{gamma}) colliders by converting electron beams into {gamma} beams, irradiating laser beams just before the interaction point. In this report we discuss the technical issues on the accelerator.
In co-operation with the Scientific Planning Department of the Central Research Institute for Vessel- and Turbine Building the construction office of the turbine factory Charkow finished the draft of a slowly running (n = 1500 min"-"1) 2 GW-turboset for the operation of nuclear power plants. The chief purpose of the project was to determine the technical problems that are used to occur during the development of such steam turbines, as well as to settle the most favourable design. (orig./GL).
The overall aim is to develope programme modules for a Danish integrated computer system for projecting buildings and to ensure that Danish programmes are compatible with international systems. The programmes to be integrated here were AutoCAD and SCRIBE-models and the simulation programme tsbi3 for the calculation of indoor climate conditions, power demand and energy consumption in buildings. For the calculation of humidity and temperature conditions in constructions a certain amount of integration is carried out with the MATCH programme (Moisture And Temperature calculations for Constructions of Hygroscopic materials). The activities embodied in the pilot projects are described in this working report in addition to the individual computer programmes and prototypes, and examples and diagrams are presented. The programmes included are a geometry programme for the calculation of areas, lengths and ...
One of the main factors that require special attention in a pipeline construction is the cold bending process, once depending on the region that the line will be installed the number of bends may achieve 75%, as it was observed in some areas during Campinas-Rio pipeline construction. A study was carried out to evaluate the X80 cold bending operational parameters in order to make viable the use of high strength pipes in the construction of onshore pipelines. For this analysis three pipes of 34 inches x 0.750 inches had been cold bended, the operation was carried out using a hydraulic equipment with punches applications along the pipe, recording the correspondent angles related to the elastic and plastic deformations in order to assess the material spring-back. After the bending process, samples of the weld, extrados and intrados were subjected to mechanical and metallographic tests, as well as performed dimensional ...
Low-cost titanium alloy components are getting increasing attention in aerospace applications. Cost reductions are possible in the alloys themselves and in the production techniques. The former aspect is less promising as titanium alloys are costly to produce. Of course, there are some new developments like the (alpha plus beta) alloy Ti-6 Al-2 Fe-0.2 Si (TIMETAL 62S) and the beta-alloy Ti-6.8 Mo-4.5 Fe-1.5 Al (TIMETAL LCB), in which low-cost iron replaces costly beta alloying elements like vanadium or molybdenum, but these will be used mainly on the mass production markets, e.g. motor car construction. In consequence, optimisation of production methods is the more promising option. Near net shape processes will reduce the production cost and improve the fly-to-buy ratio. Some of these production processes are explained. [Deutsch] Die Herstellung preiswerter Bauteile aus Titanlegierungen gewinnt auch in der Luft- und Raumfahrt zunehmend an Bedeutung. Zwei Wege ...
This study is part of a greater project from IPT (Sao Paulo's Institute of Technology), which foresaw an energetic use for elephant-grass (Pennisetum purpureum). Biomass gasification is an sustainable option for energy supply, which presents low pollutants emission rate and allows - through the global cycle of growing and consumption of feedstock (vegetables), a balance between consumption and production of carbonic gas, preventing an increase of the carbonic gas levels in the atmosphere. A gasifier was built with internal diameter of 400 mm and total height of 4600 mm . The equipment was tested for gasification of elephant-grass (Pennisetum purpureum) at a 100 kg/h rate. The equipment was tested and some constructive faults were detected. In the countryside, this biomass is commonly used for cattle feeding It was evaluated an adequate diesel-electric-generator. to work at hybrid regime, using 70% biomass gas and 30% diesel. With the ...
At the inauguration of the new CMS visitor centre. The CMS experiment inaugurated a new visitor centre at its Cessy site on 14 June. This will allow the thousands of people who come to CERN each year to follow the construction of one the Laboratory's flagship experiments first-hand. CERN receives over 20,000 visitors each year. Until recently, many of them were taken on a guided tour of one of the LEP experiments. With the closure of LEP, however, trips underground are no longer possible, and the Visits' Service has put in place a number of other itineraries (Bulletin 46/2000). Since the CMS detector will be almost entirely constructed in a surface hall, it is now taking a big share of the limelight. The CMS visitor centre has been built on a platform overlooking CMS construction. It contains a set of clear descriptive posters describing the experiment, along with a video projection showing animations ...
Canadian oilfields are a prime breeding ground for talent, technology and industrial management. This paper described how Canadian talent was recognized in 2001 for three major projects which included a cold-ocean production platform in the Sea of Okhotsk in Siberia, a mountain pipeline project in South America, and an in-situ underground extraction technology in the oilsands of Alberta. The cold-ocean production platform project was recruited by Sakhalin Energy Investment Co., an international consortium originally led by Marathon Oil Co which is now led by Royal Dutch Shell. The oil production platform is stationed 16 kilometres offshore of Sakhalin Island in the Sea of Okhotsk. Sakhalin Energy bought and converted the Molikpaq, an innovative platform made in the 1980s for the Beaufort Sea by Gulf Canada Resources Ltd. The second project included Calgary's Hydroconsult EN3 Services Ltd. which ...
DMT has developed what is called the stepped reforming process. This is an allothermal gasification process which uses hydrogen for a gasification medium. First the biomass is pyrolised by means of a heat transfer material. The escaping gaseous and condensable constituents are hydrogenated, heated in a reforming stage and are made to react to a hydrogen-rich product gas by means of homogeneous gasification. The heat required for this is provided by burning the pyrolysis coke. This makes it possible to dispense with process stages that would involve gasification of solid material and hence require higher pressure levels. The present process also works at ambient pressure. Moreover, stepped reforming promises a number of additional advantages: low-tar product gas containing 60% hydrogen, high cold gas efficiency, no wastewater arisings, robust operating behaviour. This paper outlines the basic ideas that led to the development of stepped reforming process and describes its diverse ...
This proceedings volume comprises 17 papers on the following subjects: Methane hydrates, compounds of gas and water; Compressed air stroage gas turbine power plants / Scheduled application for load levelling between varying wind power production and power demand; Modern pumped storage power stations in the GW range - the PSW Goldisthal example; Lead batteries - new developments and future applications; Alkaline battery systems for hybrid electric road vehicles; Lighium systems and their applications; Zinc/air cells; Hydrogen storage - metal hydride storage, compressed gas storage, LNG storage; Carbon nanofibres for hydrogen storage; Double-layer condensers - technology, cost, perslpectives; Supercondensers in motor vehicles; Superconducting magnetic energy stores; Flywheel storage - status report; Decentralized energy storage in the European integrated supply grid - the EU project DISPOWER; Intercontinental integration of power supply - perspectives of full-scale ...
Full text: In heavy-water-moderated power reactors, tritium is primarily produced by neutron capture in deuterium nuclei in the moderator and coolant. For CANDU 6 reactors, the estimated steady-state values are #approx# 3 TBq#centre dot#kg"-"1 D_2O in the moderator and #approx# 74 GBq#centre dot#kg"-"1 D_2O in the coolant. Tritium removal is one option available to reactor operators for use in their heavy water and tritium management strategies. The WTRF is designed to remove tritium from tritiated heavy water in each of the four CANDU units at the Wolsung Site, to immobilize the tritium and to store it on site. The detritiation process is based on three steps: the first one (front-end) involves the transfer of tritium from heavy water to deuterium gas; the second one (enrichment) concentrates the tritium in a cryogenic distillation system to produce essentially pure D_2 and T_2 streams; and in the third step the tritium is packaged for long-term storage. The WTRF will enable KHNP to ...
Japan International Cooperation Agency (JICA) Technical Cooperation Project on Reduction of Seismic Risk for Buildings and Structures started in Romania on October 1, 2002. The aim of the Project is to strengthen the capacity of earthquake disaster related activities in Romania. The Project approval is the result of four years of intensive efforts made by professionals from Technical University of Civil Engineering Bucharest (UTCB), Ministry of Transport, Constructions and Tourism (MTCT), Romania, National Building Research Institute (INCERC) Bucharest, JICA, Building Research Institute (BRI), Tsukuba, and National Institute for Land, Infrastructure and Management (NILIM), Tsukuba, Japan. The duration of the Project is five years. The implementing agency is the National Center for Seismic Risk Reduction (NCSRR) as a public institution of national interest under MTCT. The activities ...
Research on and with ethnic minority students is characterised by a growing international literature that privileges 'liberal multiculturalism' as a lens through which to understand their experiences, yet ethnic diversity is constructed and responded to in many societies that are not underpinned by liberal democratic values. In this paper we use Joppke's binary to show how researching ethnic minority students outside of a liberal democratic framework requires methodologies that enable researchers to see beyond the invisibility that is often attached to ethnic minorities. We show how invisibility (i.e. antidiscrimination) can also be further culturally constructed, confounding even more any broader multicultural project. We canvass four broad areas including the role of legally binding legi...
Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.
After the LEP dismantling Phase the Cooling and Ventilation Group has started the LHC construction work. Year 2001 through to 2004 will certainly be the most important period of activity for the CV group in the erection phase The author will report on the current works that are in progress on the different LHC Points distinguishing between the Ventilation and the Water Cooling installations. The Ventilation work completed in the new surface buildings in Points 1, 4,5,6 and 8. The work for the Cooling plants comprehend to the pumping stations, the cooling towers and the chilled water production stations in Points 1 and 5, For all of these activities, an updated report of the progress the work, the planning and of the expenses are given. Finally, a brief overview of the future activities is presented.
The construction and the development of a UV free electron laser have been started under the cooperation of Nihon U, KEK, PNC, ETL and Tohaku U. The project requires a 100MeV S-band electron linear accelerator to expand the oscillation of FEL using fundamental mode to the UV region. The injection system consists of a thermionic RF-gun with a LaB cathode and an {alpha} magnet for magnetic bunching. We are studying to reduce the back-bombardment electrons to realize the macropulse length of 20{mu}sec. Electron beams, up to the energy of 100MeV, are injected into the optical oscillators. Changing the accelerating energy and/or undulator parameters, this system will cover the range from infrared to ultraviolet for the applications in various fields.
The Cooling and Ventilation Group has started the LHC construction work in September 1999 and will get into full activity when LEP will be stopped and dismantled: in total 12 major contracts for an amount of about 120 MCHF will be established to build the needed installations for the LHC. The author will report on the current works that are in progress on the different LEP Points distinguishing between the Ventilation and the Water Cooling installations. The Ventilation work, completed in the new surface buildings in Points 18, is currently held in Points 4 and 5. Point 1 will follow in the near future. The work for the Cooling plants comprehend the pumping stations, the cooling towers and the chilled water production stations in Points 1 and 5, the buried pipes in Points 1 and 4. For all of these activities, an updated report of the progress of the work, of the planning and of the expenses is given. Finally, a short overview of the future activities is presented.
The divertor 'Large Project' was conceived with the aim of demonstrating the feasibility of meeting the lifetime requirements by employing the candidate armor materials of beryllium, tungsten (W) and carbon-fiber-composite (CFC). At the start, there existed only limited experience with constructing water-cooled high heat flux armored components for tokamaks. To this was added the complication posed by the need to use a silver-free joining technique that avoids the transmutation of n-irradiated silver to cadmium. The research project involving the four Home Teams (HTs) has focused on the design, development, manufacture and testing of full-scale Plasma Facing Components (PFCs) suitable for ITER. The task addressed all the issues facing ITER divertor design, such as providing adequate armor erosion lifetime, meeting the required armor-heat sink joint lifetime and heat sink fatigue life, sustaining thermal-hydraulic and ...
A project on the title is a special study of TRC (Technology Research Center) Japan National Oil Corporation, which aims at developing a system collecting many data near well bottom while drilling. The project is a 3-year project from 1993 to 1995 succeeding to results of a project on real-time drilling control technology which was finished in fiscal 1992. This paper is a record in fiscal 1993. In 1993, the first year, TRC starts a joint study with relational enterprises aiming at utilizing an EM-MWD (electromagnetic-measurement while drilling) system practically. Based on the past fruit of the study, the EM-MWD system was applied to an highly inclined well or a horizontal well. A total system was constructed, which improved electromagnetic radiation transmission efficiency, and reliability, and workability. An electromagnetic radiation receiver system for an offshore drilling rig ...
The assets that Citizen Potawatomi Nation holds were evaluated to help define the strengths and weaknesses to be used in pursuing economic prosperity. With this baseline assessment, a Planning Team will create a vision for the tribe to integrate into long-term energy and business strategies. Identification of energy efficiency devices, systems and technologies was made, and an estimation of cost benefits of the more promising ideas is submitted for possible inclusion into the final energy plan. Multiple energy resources and sources were identified and their attributes were assessed to determine the appropriateness of each. Methods of saving energy were evaluated and reported on and potential revenue-generating sources that specifically fit the tribe were identified and reported. A primary goal is to create long-term energy strategies to explore development of tribal utility options and analyze renewable energy and energy efficiency options. Associated goals are to consider exploring ...
Value Engineering (VE) is a problem solving methodology that has been used in manufacturing and construction industries for fifty years to improve products, systems and projects while reducing unnecessary cost. A Process Waste Assessment (PWA) is a newly developed methodology designed to characterize waste streams and identify opportunities to reduce or eliminate waste generation. The VE and PWA methodologies are compared to show their general similarities and specific differences, and to suggest how VE can be woven into the PWA methodology. Further, the roles of the VE and PWA team leaders and their training are compared; suggestions are made to help enable the PWA team leader to more effectively lead a group-centered creative process. Examples of how VE has been used in hazardous and radioactive waste minimization and pollution prevention projects are presented, also.
Two days of hearings on Titles V and X of the Water Resources Development Act of 1983 brought comments from representatives of several states, farm and transport industries, environmental groups, and concerned taxpayers. Title V requires the collection of new funds from users beyond a ceiling set for annual spending on water projects, while Title X proposes a cost-sharing partnership for certain navigation projects. Witnesses were requested to confine their comments to constructive alternatives to the proposed legislation. Additional material on the deep river study and statements submitted for the record follow the testimony of 28 witnesses.
Although past research has reported the benefits of intuition in new product decision-making (i.e., higher quality product; enhanced customer satisfaction), intuition has largely been studied as an individual phenomenon and little work has examined the role of intuition on new product development (NPD) project teams. Furthermore, in a turbulent environment, NPD project teams may rely more on intuitive judgments, and other factors such as experience and stress may also influence the relationship between team intuition and team decision making. Drawing from the organizational design literature on creativity in decision making, this study builds a conceptual model of NPD team intuition and its effect on the team's ability to generate creative new products. We then derive hypotheses regarding ...
A brief FFTF project description is provided which includes general plant siting information, general layout, plant design parameters, description of principal systems and components, and description of support facilities. The current status of the FFTF project is provided, including status of plant construction, overall status of the plant checkout and test program, status of operating authorization and plant operating procedures and personnel, and status of reactor core components and experiments. Specific information on the acceptance test program and early program results is discussed. The role of FFTF in the future breeder program is described, including its objectives for verification of plant system and components designs and operability and use as an irradiation test facility.
This paper reports on hydroelectric pumped storage which is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize overall system performance. Because of increased environmental and regulatory constraints, few acceptable sites, long schedules, and huge financial commitments, large conventional pumped storage plants, are now virtually impossible to build. As an alternative, small modular pumped storage, with project sizes ranging from 25 MW to 200 MW, was created to overcome the difficulties of conventional projects. The modular approach involves standardizing the elements of a pumped storage plant by utilizing specialized siting techniques and optimizing design, equipment, and construction. Compared with conventional pumped storage, the modular design can reduce cost and expedite schedule; reduce environmental concerns and ...
The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades.
Within the past two and one half years of the project ``Surface Physics With Cold and Thermal Neutron Reflectometry`` a new thermal neutron reflectometer was constructed at the Rhode Island Nuclear Science Center (RINSC). It was used to study various liquid and solid surfaces. Furthermore, neutron reflection experiments were be un at different laboratories in collaboration with Dr. G.P. Fetcher (at Argonne National Laboratory), Dr. T. Russell (IBM Almaden) and Drs. S.K. Satija and A. Karim (at the National Institute for Standards and Technology). The available resources allowed partial construction of an imaging system for ultracold neutrons. It is expected to provide an extremely high resolution in momentum and energy transfer in surface studies using neutron reflectometry. Much of the work reported here was motivated by the possibility of later implementation at the planned Advanced Neutron Source at Oak Ridge. In a ...
Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results ...
This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fish Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed ...
We construct representation of the Separated Variables (SoV) for the quantum SL(2,R) Heisenberg closed spin chain and obtain the integral representation for the eigenfunctions of the model. We calculate explicitly the Sklyanin measure defining the scalar product in the SoV representation and demonstrate that the language of Feynman diagrams is extremely useful in establishing various properties of the model. The kernel of the unitary transformation to the SoV representation is described by the same "pyramid diagram" as appeared before in the SoV representation for the SL(2,C) spin magnet. We argue that this kernel is given by the product of the Baxter Q-operators projected onto a special reference state.
McLeod River Coal Ltd., a wholly owned subsidiary of Manalta Coal Ltd., has received Alberta Energy Resources Conservation Board approval to establish an open pit coal mine and plant in the northwest portion of the Coalspur field, east of Hinton. McLeod proposes to produce up to 4.2 million tonnes/year of thermal coal for 40 years, starting in 1985. The commercial viability of the project must be assessed before construction starts at the McLeod River site. The Board's ruling is subject to provincial cabinet approval.
The DP West Plutonium Facility operated by the Los Alamos National Laboratory, Los Alamos, New Mexico, was decontaminated between April 1978 and April 1981. The facility was constructed in 1944 to 1945 to produce plutonium metal and fabricate parts for nuclear weapons. It was continually used as a plutonium processing and research facility until mid-1978. Decontamination operations included dismantling and removing gloveboxes and conveyor tunnels; removing process systems, utilities, and exhaust ducts; and decontaminating all remaining surfaces. This report describes glovebox and conveyor tunnel separations, decontamination techniques, health and safety considerations, waste management procedures, and costs of the operation.
To encourage the application of robotics technology for routine radiobench applications, a laboratory dedicated to the research and development of contained robotic systems is being constructed. The facility will have several robots located in laminar flow hoods, and the hoods are being designed to allow the possibility for multiple robots to work together. This paper presents both the design features of the hoods and the general layout of the laboratory, and also discusses an application of a robotic system for the routine nuclear counting of gamma tube samples. The gamma tube system is presently operating in one of the routine analysis laboratories. 5 figs.
Financing space solar power generation programmes has several inherent difficulties. Such large-scale projects are usually easily defined with an expected economic return, construction time, useful service life and defined management structure. As yet, solar power satellites for power generation possess none of these as the idea exists conceptually and the technology still needs to be developed. Methods for overcoming these uncertainties and securing financial backing are described. Venture capital could finance a research/marketing firm. US Government support through a cost plus short-term monopoly to facilitate private debt financing could provide an answer. (UK)
PEFP(Proton Engineering Frontier Project) is developing beamlines for various application fields by using the high current 100MeV proton linear accelerator. Beamlines were characterized and categorized by the beam energy, average currents, and irradiation conditions. Among these beamlines the TR104 is designed for the basic science and the research of the aerospace. Before the construction and installation of beamlines, we try to practice and prepare the detail process of installation by the precedent study of TR104 beamline in KAERI site. By this work installation process was checked and confirmed for the same condition of the PEFP site
Marketing-led enterprise change management initiated by a major UK contractor is explored in this paper as a contrast to procurement-led changes to projects driven by clients. Procurement-led initiatives try to induce changes to behaviour through market governance. Relationship marketing and management proactively change organizational behaviour, the enterprise taking responsibility for its own destiny. Investment and resource allocation, and organizational behaviour have posed constraints, particularly concerning service continuity in construction. Overcoming these constraints offers opportunities for delivering service improvements and adding value for clients and yielding further increases in repeat business and increasing profitability. Relationship marketing is the conceptual starting...
CERN signed a Co-operation Agreement with the Government of Pakistan in 1994, which was followed in 1997 by a Protocol signed with the Pakistan Atomic Energy Commission (PAEC) concerning CMS magnet supports. CERN and PAEC then signed in 1998 a Memorandum of Understanding for collaboration in the construction of the CMS detector. The participation by Pakistani scientists and engineers in the CERN programme is channelled through the National Centre of Physics (NCP) established at the Quaid-i-Azzam University in Islamabad, under the terms of a 1999 Protocol to the 1994 Co-operation Agreement. The engineering and detector construction work performed under these Agreements has been of high quality, and the Pakistani participation is valued highly by the CMS collaboration. In continuation of this co-operation, Pakistan, represented by PAEC as funding agency, has now proposed to make in-kind contributions to the LHC Project, such ...
The first section of this Handbook describes hydro-electric projects currently under construction or recently commissioned in a number of countries. The major part of the Handbook is devoted to lists of data relating to hydro-electric plants and hydromachinery. These include: data for 1990 submitted by national power authorities on hydro-electric and pumped-storage plants in operation, under construction or planned; more detailed data for pumped-storage plants; country by country data on the dimensions, and reservoir and electrical capacity of major dams and hydro plant; a listing of roller compacted concrete dams; a listing of the world's largest turbines giving data on the largest unit at each scheme in rank order ranging from a unit capacity of 838 MV down to 147 MV; a similar list of the largest hydrogenerators ranging from a unit capacity of 825 MVA down to 150 MVA; details of turbine and generator contracts. ...
A new procedure for an efficient and sparing cleaning procedure of turbines was developed. The procedure uses cleaning and passivation chemicals that solve effectively and homogeneously salt and ferrous oxide coatings from turbines, avoiding attacks from corrosion, plugging and unbalances. In several high-pressure and condensation turbines the cleaning procedure has been already put into practice. (orig.)
Nondestructive inspection of carbon fibre-reinforced plastics (CRFP) using eddy current methods is based not only on the conductivity of the fibres. High frequencies (up to 10 MHz) give access to capacitive effects reflecting properties of the matrix. The paper presents a method using rotating eddy current probes to measure the anisotropic electrical properties. Potential applications of this method are the structural identification of laminates and the estimating of its degradation. (orig.)
Abstract Der folgende Artikel setzt die Reihe unserer ChiuZ-Beitrge zur Chemi- und Biolumineszenz mit einer interessanten und neuen experimentellen Arbeit zum -kalten Licht- spezieller ungesttigter Verbindungen fort, deren Anwendung auch in der modernen Zeit der Nanotechnologie im biochemischen bzw. medizinisch-chemischen Labor vllig neue Akzente gesetzt hat.
Old banknotes may be tomorrow's biomass. Experts on biowaste are investigating two new processes for disposal of the 1000 tonnes of old bills sorted out every year which may be an alternative to combustion. The author presents details.
This presentation outlined the corporate history of the Ohmega Group, a small company from Gaspe, Quebec which offers consulting services to the automation and telecommunication sector. It was created in 1982 and has been involved with the wind power industry since 1996. The main services provided by Ohmega Group include electrical and mechanical construction and maintenance services. This paper also reviewed the benefits of using Supervisory Control and Data Acquisition (SCADA) systems in the wind power industry to monitor, control and collect data from wind turbines. The Ohmega Group has provided consulting services to Cartier Wind Energy Inc., a company that was awarded several wind turbine projects by Hydro-Quebec Distribution. The Ohmega Group applied the SCADA system at the Baie des Sables, Anse a Valleau and Carleton wind turbine arrays. The typical architecture of SCADA systems on a wind farm was presented along with ...
The rebuilt rotor of the 224 kW Magdalen Islands VAWT was installed in 1979 and has been operating at its design speed (36.6 rpm) for about one year. Agreement between measured and theoretical performance is generally good except that maximum power may exceed theoretical predictions. Measurements of drive train losses, torque and power ripple, and rotor stresses are discussed. Although peak-to-peak cyclic stress levels are low in relation to fatigue life limits, spectral analysis of stress data indicates that the 3-per-rev component is amplified by near-resonance with the first butterfly blade mode. This resonance was subsequently de-coupled by a damped connection between the blade struts and the central column. The major future project in the Canadian program is the design, construction and testing of a megwatt-scale VAWT in cooperation with Hydro Quebec. Preliminary desigh details of this turbine, known as Project Aeolus ...
The quality assurance requirements in use today for radioactive waste facilities, geologic repositories and hazardous waste projects were developed initially for the nuclear power plant industry, and their intent is being applied by regulations and guidance documents to radioactive and hazardous waste programs. The wording of the NRC quality assurance requirements in Appendix B of 10CFR50, the related guidance documents and the industry's ANSI/ASME NQA-1 were developed over a period of several years to address quality assurance for the design and construction of the complex and interactive systems to produce electrical power using nuclear fuel. Now, those same documents are the basis for the quality assurance requirements and guidance for waste management facilities and repositories. The intent of Appendix B of 10CFR50 and NQA-1 can easily be applied to waste projects, providing one understands and uses the intent of the ...
The President`s budget request for FY 1994 included a constructionproject for the Advanced Neutron Source (ANS). However, the budget that emerged from the Congress did not, and so activities during this reporting period were limited to continued research and development and to advanced conceptual design. A significant effort was devoted to a study, requested by the US Department of Energy (DOE) and led by Brookhaven National Laboratory, of the performance and cost impacts of reducing the uranium fuel enrichment below the baseline design value of 93%. The study also considered alternative core designs that might mitigate those impacts. The ANS Project proposed a modified core design, with three fuel elements instead of two, that would allow operation with only 50% enriched uranium and use existing fuel technology. The performance penalty would be 15--20% loss of thermal neutron flux; the flux would still just meet the ...
This annual report describes the progress during the fifth year of the project which is targeted towards improving the reservoir performance of mature oil fields located in fluvially dominated deltaic geological environments. The project involves using an integrated approach to characterize the reservoir followed by proposing an appropriate reservoir management strategy to improve the field performance. In the first stage of the project, the type data the authors integrated include cross borehole seismic surveys, geological interpretation based on the logs and the cores, and the engineering information. In contrast, during the second stage of the project, they intend to use only conventional data to construct the reservoir description. This report covers the results of the implementation from the first stage of the project. It also discusses the work ...
This annual report describes the progress during the fourth year of the project on {open_quotes}Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance{close_quotes}. The project involves using an integrated approach to characterize the reservoir followed by proposing an appropriate reservoir management strategy to improve the field performance. In the first stage of the project, the type of data we integrated include cross borehole seismic surveys, geological interpretation based on the logs and the cores, and the engineering information. In contrast, during the second stage of the project, we intend to use only conventional data to construct the reservoir description. This report covers the results of the implementation from the first stage of the project. It also discusses the work accomplished so far for the ...
A discussion covers the LOOP project to construct an offshore pipeline system, which will connect with onshore facilities at Fourchon, La., and two onshore pipelines (26 mi 48 in. Clovelly line and 53 mi 48 in. LOCAP line) connecting Fourchon with the existing Capline system at St. James, La.; the three-phase construction schedule, the first phase due to begin in the third quarter of 1978 with, e.g., onshore pipeline and salt dome storage facility construction which will yield an expected initial throughput of 1.4 million bbl/day; the marine terminal complex, consisting of control and pumping platforms, and three 7000 hp pumps to operate the system at 45,000-100,000 bbl/hr; the offshore lines, including lines between single-point mooring units and the pumping platform, the 21 mi 48 in. pipe to Fourchon, and corrosion protection of lines by an asphalt-sand mixture or a semiplasticized coal-tar enamel; ...
Japan's first water power station to provide public power was the Keage plant (maximum output 160 kW) which began operation in 1891. The installed capacity of pure hydro plants reached 20 481 MW in March 1991; pumped-storage powerplants account for 17 004 MW, making a total of 37 483 MW. Pumped-storage thus represents 45 per cent of total hydro capacity. Pure hydro plants under construction at the end of March 1990 totalled 75, representing 968 MW of capacity. There were also seven pumped-storage plants under construction (each more than 300 MW). The latest survey to establish the hydro potential of Japan indicated the gross theoretical hydro potential to be 717 600 GWh/year and the exploitable potential to be 130 524 GWh/year. Of this exploitable potential, 60 per cent is in operation and 3 per cent is under construction. The exploitable potential represents 4551 pure hydro plants, with a total installed capacity ...
The Tennessee Valley Authority (TVA), the Electric Power Research Institute (EPRI), and the Department of Energy-National Energy Technologies Laboratory (DOE-NETL) are evaluating and demonstrating integration of terrestrial carbon sequestration techniques at a coal-fired electric power plant through the use of Flue Gas Desulfurization (FGD) system gypsum as a soil amendment and mulch, and coal fly ash pond process water for periodic irrigation. From January to March 2002, the Project Team initiated the construction of a 40 ha Carbon Capture and Water Emissions Treatment System (CCWESTRS) near TVA's Paradise Fossil Plant on marginally reclaimed surface coal mine lands in Kentucky. The CCWESTRS is growing commercial grade trees and cover crops and is expected to sequester 1.5-2.0 MT/ha carbon per year over a 20-year period. The concept could be used to meet a portion of the timber industry's needs while simultaneously ...
Fisheries co-managers of U.S. v Oregon supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam. In 1996, Congress instructed the U.S. Army Corps of Engineers (USCOE) to construct, under the Lower Snake River Compensation Plan (LSRCP), final rearing and acclimation facilities for fall Chinook in the Snake River basin to complement their activities and efforts in compensating for fish lost due to construction of the lower Snake River dams. The Nez Perce Tribe (NPT) played a key role in securing funding and selecting acclimation sites, then assumed responsibility for operation and maintenance of the facilities. In 1997, Bonneville Power Administrative (BPA) was directed to fund operations and maintenance (O&M) for the facilities. Two acclimation facilities, Captain John Rapids and Pittsburg ...
The German-Russian project that is part of the G8 initiative on Global Partnership Against the Spread of Weapons and Materials of Mass Destruction focuses on the speedy construction of a land-based interim storage facility for nuclear submarine reactor compartments at Sayda Bay near Murmansk. This project includes the required infrastructure facilities for long-term storage of about 150 reactor compartments for a period of about 70 years. The interim storage facility is a precondition for effective activities of decommissioning and dismantlement of almost all nuclear-powered submarines of the Russian Northern Fleet. The project also includes the establishment of a computer-assisted waste monitoring system. In addition, the project involves clearing Sayda Bay of other shipwrecks of the Russian navy. On the German side the project is carried out by the ...
Chemical admixtures are used in dam construction to improve plasticity of the dry materials mixture over time. Roller compacted concrete (RCC) has been used on many dam projects in China. However, the use of RCC has frequently resulted in water reduction problems. This paper provided details of an admixture based on polycarboxylate ether (PCE) which was developed to improve the quality of RCC constructions at the JinHong dam in China. Use of the polymer at the JinHong dam resulted in a vibration sensitive concrete that was sustained over time. Under identical mix-design and compaction conditions in the laboratory, specific gravity of the RCC was increased from 2417 kg/m{sup 3} to 2463 kg/m{sup 3}. The high specific gravity of the material resulted in satisfactory strength data from the dam project. The key-ratio of the splitting tensile strength versus compressive strength was higher than 8 per cent in ...
One of the five projects selected for funding within the Clean Coal Technology Program is a project proposed by the Pennsylvania Electric Company (Penelec) of Johnstown, Pennsylvania. Penelec proposes to enter into a cooperative agreement with DOE to design, construct and operate a 600 ton-per-day, 66-megawatt (MWe), coal-fueled, externally-fired combined cycle (EFCC) electric power generation facility. The EFCC is an emerging technology with promise for operating highefficiency combined gas- and steam-turbine cycles on coal. The central feature of EFCC is its coupling of the gas turbine to an external, atmospheric-pressure, coal combustor via a hightemperature ceramic heat exchanger (CerHx{reg_sign}) developed by Hague International. The EFCC technology is attractive because, unlike competing combined cycles such as Integrated Gasification (IGCC) and Pressurized Fluidized Bed Combustion (PFBC), it eliminates the need for a ...
In order to serve for efficient energy utilization and environmental improvement in the Republic of Vietnam, a 'Model project to reduce electric power consumption at cement burning plant' has been implemented. This paper summarizes the achievements. This project is intended to add an advanced, matured and reliable electric power generation facility using cement waste heat to the existing cement plant in Vietnam to produce steam and generate power by utilizing the waste heat generated from the preheating process in the burning plant. The present project has performed the detailed designing on the piping, electric facilities and instrumentation based on the basic agreement on the project. Fabrication of the piping has been executed by the Vietnam side. Valves and electric devices were procured and transported, including those fabricated in the previous fiscal year. Technology guiding ...
This is the third quarterly progress report for Year 3 of the ACTS Project. It includes a review of progress made in: (1) Flow Loop construction and development and (2) research tasks during the period of time between Jan. 1, 2002 and Mar. 31, 2002. This report presents a review of progress on the following specific tasks: (a) Design and development of an Advanced Cuttings Transport Facility (Task 3: Addition of a Cuttings Injection/Separation System), (b) Research project (Task 6): ''Study of Cuttings Transport with Foam Under LPAT Conditions (Joint Project with TUDRP)'', (c) Research project (Task 9b): ''Study of Foam Flow Behavior Under EPET Conditions'', (d) Research project (Task 10): ''Study of Cuttings Transport with Aerated Mud Under Elevated Pressure and ...
As part of the licensing process to construct a new 230 kV transmission line on an existing right-of-way in Manitoba, an electrical effects study was conducted in 1998. The study was part of the environmental assessment program crucial in obtaining government approval to construct the line. Some residents living adjacent to the new transmission circuit expressed concerns about alleged adverse health effects associated with long-term exposure to magnetic fields from high voltage transmission lines. In order to verify the accuracy of the predicted magnetic field levels submitted to the regulatory body in the the electrical effects study and to instill confidence in the residents of the affected communities, a three-year magnetic monitoring project was conducted between 2003 and 2005 along the right-of-way after the new 230kV transmission line was energized by Manitoba Hydro. This paper described the monitoring program, with ...
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the ...
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the ...
This article described a full-scale green renovation project undertaken by a construction management firm in Newton, Massachusetts. Chapman Construction and Design began renovating its own office building in late 2007 and completed it in September 2008. The firm set out to achieve LEED Platinum certification from the United States Green Building Council. The project involved energy saving modifications to its mechanical systems; replacing plumbing fixtures with high efficiency alternatives to reduce water consumption by at least 40 per cent; installing skylights and additional windows to allow more natural light into the interior space; salvaging doors, lighting, metal studs and masonry whenever possible; and using sustainable products such as recyclable carpets, tiles and low-VOC paint. The main feature of the renovation was a new 47 kW (DC) photovoltaic (PV) solar power array installed on the rooftop. ...
The Advanced CANDU Reactor (ACR"T"M) is the 'Next Generation' CANDU"R reactor, aimed at safe, reliable power production at a capital cost significantly less than that of current reactors such as the very successful CANDU 6 reactors (e.g., Wolsong 1-4). The Wolsong 1-4 units are being joined by the Qinshan Phase 3 units in China as the current successful examples of CANDU technology. The ACR design builds on this knowledge base, adding a selected group of innovations to obtain substantial cost reduction while retaining a proven design basis. The ACR maximizes the use of components and equipment applications that are well proven through CANDU and other nuclear experience. Joint development of equipment designs and specifications with manufactures has been emphasized. Similarly, the ACR design emphasizes constructability, and takes advantage of inherent CANDU features to enable short project and construction schedules. ...
One of our research objectives is to develop chemistry of transition metal chalcogenides which are relevant to new inorganic materials, environmental catalysts, metalloenzymes. In this context, this research project has been aimed at rational syntheses of chalcogenide complexes of electron-deficient transition metals, construction of hetero metallic clusters with high nuclearity, and elucidation of chemical properties characteristic of these metal chalcogenide compounds. We were successful in synthesizing a series of sulfide (selenide)/thiolate complexes of group 4,5 and 6 transition metal elements by making use of C-S bond cleaving reactions and anhydrous chalcogenide reagents. We also achieved construction of unprecedented large chalcogenide clusters of mixed metal systems such as [Cu{sub 4}(dppm){sub 4}MS{sub 4}] [PF{sub 6}]{sub 2} (M=Mo, W), [(Cp*WS{sub 3}Ag{sub 2}){sub 2}({mu}-Br){sub 2}]{sub {infinity}}, and [Cp*{sub ...
After the construction of its wastewater treatment plants, the City of Quebec began to implement overflow control in wet weather to ultimately meet the effluent discharge objectives, i.e. no more than two overflows per summer season in the St. Lawrence River and no more than four in the St-Charles River. After several years of studies to determine which management strategies would best suit the purpose, and to propose optimum solutions, a first project to implement optimal and predictive management in real time, called "Pilot", came to life in 1999. Construction in phases soon followed and the work was completed in the fall of 2009. As a result, requirements with regard to environmental rejects were met in two sectors, namely the St-Charles River and the Jacques-Cartier Beach, and aquatic recreational activities could resume. Meanwhile, the City also worked at giving back access to the water courses to the public by ...
The live outdoor webcam seems inseparable from the mid-1990s' popular proliferation of the Internet. Combining a well-known medium, i.e. the photograph, with a new one, i.e. the Internet, the live outdoor webcam seems in the rear-view mirror to have contributed significantly to the popular perception of the Internet as a globally distended and thus "geographical" medium. Moreover, due to its role in the NASA Triana mission, the never-realised flagship of the Clinton-Gore administration's Digital Earth project, the live webcam seemed to play an important part in the construction of what leading geographers coined a "virtual geography"-the geography of the Internet, and the networked geography-that sought to establish itself as a new field of study during the late 1990s. In order to substantiate for this interpretation, I would like in the first part of this article to identify a number of basic characteristics of the outdoor webcam and, in the ...
Elise is a heavy ion induction linear accelerator that will demonstrate beam manipulations required in a driver for inertial fusion energy. With a line charge density similar to that of heavy ion drivers, Elise will accelerate a #>=# 1 gs beam pulse of K"+ ions from an initial energy of 2 MeV to a final energy #>=# 5 MeV. In the present design, the Elise electrostatic quadrupoles (ESQ) will have a 2.33 cm radius aperture operating at #+-#59 kV. The half-lattice periods range from 21 cm to 31 cm. The entire machine will be approximately 30 m long, half of that is the induction accelerator and the remaining half is the injector (including the Marx generator) and the matching section. Elise will be built in a way that allows future expansion into the full ILSE configuration, therefore it will have an array of four ESQ focusing channels capable of transporting up to a total of 3.2 A of beam current. Elise will also have an active alignment system with an alignment tolerance of less ...
Development of the Conawapa-Winnipeg power transmission complex in Manitoba includes five interrelated transmission and conversion facilities. Environmental and socio-economic assessment work done to date on one component of this system (the upgrading of the Southern Receiver System) is described. This system is composed of a network of high voltage transmission lines and station facilities serving power demand in Winnipeg and southern Manitoba. The upgrading involves three main elements: energizing a second 230 kV ac circuit on an existing tower line running from the proposed Riel Station site to the existing St. Vital Station; constructing a new double-circuit 230 kV tower line on the same existing right-of-way between St. Vital and the Riel site area; and installing an additional transformer and other necessary equipment at St. Vital and other stations affected by the upgrade. The environmental impacts of these projects are generally not ...
The Fuel Handling(F/H) System in existing CANDU 6 nuclear power plants was designed in the early 1960`s, utilizing the technology available at that time. The design for the F/H control system has been proven to be excellent in meeting the functional requirements through more than 20 CANDU units in service or under construction. The significant advance in electrical and electronic engineering area in a few decades motivates the design changes to reduce costs for engineering, construction and operation as well as to improve performance, reliability and safety based on the latest technology. This report outlines the current design of the F/H system, especially for the F/H control system, introduces some topics in research and development projects being carried out by AECL or other institutes, and presents several potential design improvement items for the better CANDU system with brief explanation about implementation. 29 ...
Non-linear realisations of the groups SU(2), SO(1,4) and SO(2,4) are analysed, described by the coset spaces SU(2)/U(1), SO(1,4)/SO(1,3) and SO(2,4)/SO(1,3) x SO(1,1). The Lie algebras of certain special unitary and special orthogonal groups are studied and their projection operators are determined in order to facilitate the above analyses, in particular that of SO(2,4)/SO(l,3) x SO(1,1). The analysis consists of determining the transformation properties of the Goldstone bosons, constructing the most general possible Lagrangian for the realisations and finding the metric of the coset space.
In this paper we present status and developments of the Duke storage ring facility. The Duke storage ring facility provides the unique combination of phase-locked light sources ranging from high power OK-4 XUV FEL to quasimonochromatic {gamma}-ray beam and IR/X-ray spontaneous radiation. The XUV OK-4 FEL, which is collaborative project with BlNP, Novosibirsk, is in operation since November, 1996. The OK-4 UV FEL is also used for production of nearly monochromatic {gamma}-ray s with tunable energy. We present the results of UV lasing with the OK4 FEL and selected results of its applications. We will discuss our future plans for extension of this source and status of the construction of dedicated used facility adjacent to the FEL building. (author)
Effective integration of nonproliferation management into the design process is key to the broad deployment of advanced nuclear energy systems, and is an explicit goal of the Laser Inertial Fusion Energy (LIFE) project at Lawrence Livermore National Laboratory. The nuclear explosives utility of a nuclear material to a state (proliferator) or sub-state (terrorist) is a critical factor to be assessed and is one aspect of material attractiveness. In this work, we approached nuclear explosives utility through the calculation of a ''figure of merit'' (FOM) that has recently been developed to capture the relative viability and difficulty of constructing nuclear explosives starting from various nuclear material forms and compositions. We discuss the integration of the figure of merit into an asse...
This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.
Source Philippe (on the island of La Govave, near Haiti) is described in terms of climatic, sociological, agricultural and technical background. Because of drought conditions, it became necessary to develop a solar still to provide the town with sufficient fresh water. The still, which has been in operation since 1969, is described in some detail as is the construction process. Brackish and sea water are used to produce more than 1250 liters of fresh water each day. A windmill is used to pump the brackish water from a well to an elevated storage tank; it flows by gravity to solar still basins where it is vaporized, then condensed on a sloping glass surface and collected. Benefits of the solar still to the town's economy and health are discussed. Cost of the project was $17,000. 10 references. (MJJ)
The Electric Fuel Limited (EFL) refuelable zinc-air battery system is currently being tested in a number of electric vehicle demonstration projects, the largest of which is a field test of zinc-air postal vans sponsored chiefly by Deutsche Post AG (the German Post Office). The zinc-air battery is not recharged electrically, but rather is refueled through a series of mechanical and electrochemical steps that will require a special infrastructure in commercial application. As part of the German Post Office field test program, Electric Fuel designed and constructed a pilot zinc anode regeneration plant in Bremen, Germany. This plant is capable of servicing up to 100 commercial vans per week, which is adequate for the field test vehicle fleet. This paper will describe the design and operation of each of the areas and devices within the plant.
We show that the moduli space of all Calabi-Yau manifolds that can be realized as hypersurfaces described by a transverse polynomial in a four dimensional weighted projective space, is connected. This is achieved by exploiting techniques of toric geometry and the construction of Batyrev that relate Calabi-Yau manifolds to reflexive polyhedra. Taken together with the previously known fact that the moduli space of all CICY's is connected, and is moreover connected to the moduli space of the present class of Calabi-Yau manifolds (since the quintic threefold P_4[5] is both CICY and a hypersurface in a weighted P_4), this strongly suggests that the moduli space of all simply connected Calabi-yau manifolds is connected. It is of interest that singular Calabi-Yau manifolds corresponding to the points in which the moduli spaces meet are often, for the present class, more singular than the conifolds that connect the moduli spaces of CICY's.
Although state estimation is a mature technique which is widely available in the EMS industry, experience with practical implementation and use of state estimation and network security analysis functions at electric power utilities over the last two decades indicates recurring difficulties and problems attributable to inadequate external network modeling detail and data. This paper addresses the development of a set of guidelines for external network modeling and data exchange, based on the results of a recent project sponsored by EPRI. A general methodology is developed based on the results of a survey of a representative set of utilities and EMS suppliers, supplemented by subsequent analysis and simulation studies. Distinction is made between guidelines pertaining to external network topology, analog measurements, data exchange, and implementation procedures. A philosophy and approach for constructing and testing external models is also ...
Shell UK Exploration and Production, operating in the North Sea on behalf of Shell UK and Esso UK is presented developing the Teal and Guillemot fields in the Central North Sea (CNS). As part of this development it contracted with Single Buoy Moorings Inc., (SBM) for the design, supply and installation of a newbuilt floating Production Storage and Offloading (FPSO) vessel. The work is executed in close cooperation between Shell Expro (Client) and SBM (Contractor) and its main sub contractors. The system is due to be installed during the third quarter of 1996. After a short description of the field development and the FPSO vessel this paper outlines the contractual arrangements and the organization set-up to perform the work. A summary of the lessons learned (by SBM) is given. The opinions expressed in this paper are entirely that of the author and may not necessarily reflect the opinion of other parties involved in the CNS FPU project.
The Linac Coherent Light Source [1] (LCLS) at SLAC National Accelerator Laboratory is preparing for the arrival of its first scientific users in the fall of 2009. LCLS is the world's first free-electron in the spectral range 800-8,000 eV, producing intense, sub-picosecond pulses of Xrays with very high spatial coherence. The accelerator facility has been commissioned in stages, beginning in April 2007 [2] with the injector linac and culminating in December 2008 [3] with the first transport of electrons through the complete beam path. On April 10, 2009, the LCLS Project team was rewarded for years of planning, design, construction, and checkout with a dream-come-true: as undulators were placed on the beam path one-by-one, the laser simply turned on without drama in the course of one hour [4...
This paper seeks to challenge the traditional way in which we assess the value of green buildings in terms of their environmental friendliness, energy efficiency and whole life cost. In the UK, quantity surveyors (or cost consultants) have a perception that more energy efficient and environmentally friendly buildings cost between 5% and 15% more to build from the outset. This common assumption is not backed up by recent research and should be questioned. Construction professionals need to be informed of the whole life cost and environmental impact of buildings so that they can encourage key stakeholders to make more sustainable choices. These emerging issues together with practical tools are considered with case studies from recent projects. (Author)
While it is difficult to prove that a specific material is causing contamination in a landfill, tests have been conducted at waste-to-energy facilities that indicate that household batteries contribute significant amounts of heavy metals to both air emissions and ash residue. Hennepin County, MN, used a dual approach for developing and implementing a special household battery collection. Alternative collection methods were examined; test collections were conducted. The second phase examined operating and disposal policy issues. This report describes the results of the grant project, moving from a broad examination of the construction and content of batteries, to a description of the pilot collection programs, and ending with a discussion of variables affecting the cost and operation of a comprehensive battery collection program. Three out-of-state companies (PA, NY) were found that accept spent batteries; difficulties in reclaiming household ...
While it is difficult to prove that a specific material is causing contamination in a landfill, tests have been conducted at waste-to-energy facilities that indicate that household batteries contribute significant amounts of heavy metals to both air emissions and ash residue. Hennepin County, MN, used a dual approach for developing and implementing a special household battery collection. Alternative collection methods were examined; test collections were conducted. The second phase examined operating and disposal policy issues. This report describes the results of the grant project, moving from a broad examination of the construction and content of batteries, to a description of the pilot collection programs, and ending with a discussion of variables affecting the cost and operation of a comprehensive battery collection program. Three out-of-state companies (PA, NY) were found that accept spent batteries; difficulties in reclaiming household ...
The automotive industry desires to optimize safety and lightweight construction for the production of cars and trucks. The resulting task for steel suppliers is to make steel grades available that can fulfil these requirements. Different projects have shown optimistic outlooks for optimization of safety and reduction of the weight of automobile bodies by using different high strength and ultra high strength steels. In the last group the dual phase steels play the lead. In recent years different steel grades have been developed and optimized for these applications. On one hand developing the mechanical properties as well as joining and forming of dual phase steels is one of the first steps. On the other hand different coated surfaces for various applications of dual phase steels is another step. Starting with characteristic production conditions for cold rolled hot dip galvanised dual phase steels, the mechanical properties for joining and ...
The Department of Energy decided to terminate the Flywheel Rotor and Containment Technology Development project during FY 1983. Activities this year included fabrication, inspection, and test evaluation of rotor and containment structures. A peak energy of 700 Wh was stored at an energy density of 70 Wh/kg. In cyclic tests, 10,000 cycles from design speed to half speed were logged without failure. The first test of a lightweight containment structure indicates the need for additional development. In complementary studies, production cost estimates were made for three flywheel designs. In a cooperative program with the University of Wisconsin, work began on construction of a flywheel/continuously variable transmission/heat engine car which promises fuel economy improvements of up to 100%. Suggestions are made for the direction of future work when interest in flywheel system reappears.
The article describes the solar aircraft `Icare`` which was constucted in a joint project by engineers and scientists of Stuttgart university. The aircraft requires slightly more than one kW for staying up. The theoretical fundamentals are presented in the dissertation of Peer Frank, ``Aircraft design for minimum fuel consumption` (Institute of Aircraft Engineering, Stuttgart, 1992). (orig.) [Deutsch] Allein mit Sonnenkraft kann das Flugzeug `Icare` fliegen. Es entstand in Gemeinschaftsarbeit von Ingenieuren und Wissenschaftlern der Stuttgarter Universitaet. Das Solarflugzeug Icare benoetigt etwas ueber ein Kilowatt, um oben zu bleiben. In seiner Doktorarbeit `Die Auslegung von Flugzeugen mit geringstem Antriebsleistungsbedarf` (Institut fuer Flugzeugbau, Stuttgart, 1992) hat der Duesseldorfer Peer Frank die theoretischen Grundlagen dazu behandelt. (orig.)
The authors explain the bankers' point of view of the financial and economic aspects of developments in the energy sector, discussing the financing of natural gas pipelines (Muro, Megal, etc.), of nuclear power plant construction, of projects in the oil supply sector, and of pollution abatement measures and equipment for the power industry and other industries. The different financial situations of small firms or large firms supplying pollution control equipment are discussed referring to the financing schemes to be set up, explaining among other things the profitability assessment taking into account long-term development or delays in return on capital investment from borrowed funds as induced, e.g., by delays in the licensing procedure. Future demand for borrowed capital for pollution control or nuclear power plant development is difficult to assess by the banking circles. (orig./RST).
A Final Environmental Impact Statement (FEIS) related to the licensing of Envirocare of Utah, Inc.`s proposed disposal facility in Tooele county, Utah (Docket No. 40-8989) for byproduct material as defined in Section 11e.(2) of the Atomic Energy Act, as amended, has been prepared by the Office of Nuclear Material Safety and Safeguards. This statement describes and evaluates the purpose of and need for the proposed action, the alternatives considered, and the environmental consequences of the proposed action. The NRC has concluded that the proposed action evaluated under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, is to permit the applicant to proceed with the project as described in this Statement.
Glass fiber-reinforced polymer (GFRP) reinforcing bars were used recently as main reinforcement for concrete structures. The noncorrodible GFRP material exhibits linear-elastic stress-strain characteristics up to failure with relatively low modulus of elasticity compared to steel. This raises concerns on GFRP performance in structures where energy dissipation, through plastic behavior, is required. The objective of this research project is to assess the seismic behavior of concrete beam-column joints reinforced with GFRP bars and stirrups. Two full-scale exterior T-shaped beam-column joint prototypes are constructed and tested under simulated seismic load conditions. One prototype is totally reinforced with GFRP bars and stirrups, while the other one is reinforced with steel. The experimen...
Machine-to-machine (M2M) communications is a new and rapidly developing technology for large-scale networking of devices without dependence on human interaction. Energy efficiency is one of the important design objectives for machine-to-machine network architectures that often contain multi-hop wireless subnetworks. Constructing energy-efficient routes for sending data through such networks is important not only for the longevity of the nodes which typically depend on battery energy, but also for achieving an environmentally friendly system design overall, which will be imperative as M2M networks scale in number of nodes as projected. The objective of this survey is to provide a comprehensive look into shortest-path based energy-efficient routing alternatives to provide a reference for sys...
This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period October 1, 2004 through December 31, 2004. The following tasks have been completed. First, the renovation of the new Combustion Laboratory and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building have proceeded well. Second, the detailed design of supporting and hanging structures for the CFBC was completed. Third, the laboratory-scale simulated fluidized-bed facility was modified after completing a series of pretests. The two problems identified during the pretest were solved. Fourth, the carbonization of chicken waste and coal was investigated in a tube furnace and a Thermogravimetric Analyzer (TGA). The experimental results from this study are presented in this report. Finally, ...
This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period July 1, 2004 through September 30, 2004. The following tasks have been completed. First, renovation of the new Combustion Laboratory and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building have started. Second, the design if the component parts of the CFBC system have been reviewed and finalized so that the drawings may be released to the manufacturers during the next quarter. Third, the experiments for solid waste (chicken litter) incineration have been conducted using a Thermogravimetric Analyzer (TGA). This is in preparation for testing in the simulated fluidized-bed combustor. The experimental results from this study are presented in this report. Finally, the proposed work for ...
We are developing a refuelable zinc/air battery (6-cells) for evaluation under the five USABC `core` test protocols. In the first half of the two year project ($1OOK, FY1997), an advanced refuelable design was developed, fabricated and tested at power levels up to 415 W. Performance matched or exceeded that of earlier multicell systems. A computer program was developed for automated data acquisition and drive cycle simulation. Small mockup cells (80 cm 2) were constructed for rapid testing of components. In the follow-on effort (FY1998, $1OOK) we will make minor advances in system design and fabrication efficiency, and seek to improve cathode performance and life, before delivery of two final units for test at DOE laboratory.
This project seeks to produce sufficient information on the physical and chemical nature of Coolside waste to design and construct physically stable and environmentally safe landfills. Unconfined compressive strength and permeability tests are reported on samples remolded near 90, 95, and 100% of low energy, standard, and modified dry densities. Unconfined compressive strength tests were also performed on some of the samples after permeability tests were completed. Swell tests were initiated on samples from Coolside pilot plant run {number_sign}2 and on a FBC hydrated ash remolded near 95% of standard density and optimum moisture content.
Cheap air conditioning from oceanic temperature differences is a possible new competitor for coal in coastal regions. Coal suppliers planning expansion in growing economies need to be aware of the possibilities and limitations of this new competitor. Ocean thermal energy conversion (OTEC) used to be uneconomic but the National Energy Laboratory of Hawaii (NELH) has developed a very economic method of utilising the temperature difference between warm ocean surface and cold deep ocean to generate energy for air conditioning. The article outlines the process and mentions demonstrations of OTEC technology to produce electricity and air conditioning at a site in Kailua-Kona, Hawaii. Indonesia and India have viable sites for OTEC installations, and NELH is working with Madras State on a project to construct a commercial OTEC plant in India. 2 photos.
A calorimetric sensor with several novel design features has been developed. These sensors will provide an accurate sampling of thermal power density and energy deposition from proton beams incident on target components of accelerator-based systems, such as the Accelerator Production of Tritium Project (APT) and the Spallation Neutron Source (SNS). A small, solid slug (volume = 0.347 cc) of target material is suspended by kevlar fibers and surrounded by an adiabatic enclosure in an insulating vacuum canister of stainless steel construction. The slug is in thermal contact with a low-mass, calibrated, 100-k{Omega} thermistor. Power deposition caused by the passage of radiation through the slug is calculated from the rate of temperature rise of the slug. The authors have chosen slugs composed of Pb, Al, and LiAl.
The free-electron laser (FEL) projects that are currently in progress in Japan are discussed. Particular attention is given to the storage ring FELs at the Electrotechnical Laboratory, the Institute for Molecular Physics, and the Kyushu University; the superconducting linear accelerator (SC linac) FELs being developed at the Japan Atomic Energy Research Institute; and the RF-linac FEL being developed by the Nuclear Engineering Research Laboratory of the University of Tokyo, the Institute of Scientific and Industrial Research of Osaka University, the Mitsubishi Electric Company, and Tokyo Institute of Technology. Consideration is also given to the microtron FEL being constructed at the Nihon University; the induction-linac and pulseline FELs of the Institute of Laser Engineering of Osaka University, the Institute of Physical and Chemical Research, the National Laboratory for High-Energy Physics, and ISAS; and the Smith-Purcell-effect FEL ...
Since 1979, scientists and engineers at the Los Alamos National Laboratory have designed, constructed, and operated a radio-frequency (RF) linac free-electron laser (FEL) at wavelengths from 9 to 45 /mu/m. Coupled with success of other research centers investigating wavelengths from the visible to far-infrared, Los Alamos is now proposing a vacuum-ultraviolet and soft x-ray (referred to henceforth as extreme ultraviolet, (XUV)) FEL oscillator/Self-Amplified Spontaneous Emission amplifier with beam energies ranging from 100 MeV to 1 GeV. This paper will focus on the first milestone of the proposed Los Alamos XUV project, i.e., a 250-MeV linac with approximately 50 mA of average current, producing photons with wavelengths below 1000 /angstrom/. 3 refs., 3 figs.
Canada's offshore Atlantic petroleum industry is celebrating its tenth anniversary in 2001. This article chronicles the development of the industry discussing the many challenges and setbacks and the eventual triumphs that accompanied the industry's development over the years. Highlights discussed include shipping first oil from the Cohasset Field in July 1992; the financial crisis caused by the withdrawal of Gulf Oil from the Hibernia consortium in the same year; new funding and the beginning of the gravity-based structure construction at Bulls Arm in 1993; striking oil in the Hibernia Field in 1994; the start of exploration and development of the Terra Nova field by Petro-Canada in the same year, based on the floating production, storage and offloading (FPSO) system, which heralded a new era of offshore development in eastern Canada. Approval by the Nova Scotia government of the third and final phase of the Sable Offshore Energy ...
We prove a theorem relating torus-equivariant coherent sheaves on toric varieties to polyhedrally-constructible sheaves on a vector space. At the level of K-theory, the theorem recovers Morelli?s description of the K-theory of a smooth projective toric variety (Morelli in Adv. Math. 100(2):154?182, 1993). Specifically, let X be a proper toric variety of dimension n and let Formula Not Shown be the Lie algebra of the compact dual (real) torus Formula Not Shown . Then there is a corresponding conical Lagrangian ??T ? M ? and an equivalence of triangulated dg categories Formula Not Shown , where Formula Not Shown is the triangulated dg category of perfect complexes of torus-equivariant coherent sheaves on X and Sh cc (M ?;?) is the triangulated dg category of complex of sheaves on M ? with co...
Papers presented at the workshop include: the longterm viability of mined land in Queensland; the determination and achievement of rehabilitation objectives: a state government objective; monitoring native vegetation in regenerated bauxite mines at Weipa: a belt transect method; rehabilitation strategies at the Collinsville open cut coal mine; the alteration of the environment by the construction and operation of the coal export facility at Abbot Point; some aspects of the premining environment at Collinsville; the prospects for long term revegetation of acid coal mine spoil and reject materials; recovery and stability in disturbed and artificially revegetated plant communities: a theoretical viewpoint; revegetation in the arid tropics: Mount Isa Mines' experience; Nabralek and its rehabilitation; rehabilitation and management strategies for acid mine wastes; the purpose and design of water quality monitoring networks at mine sites; Worsley alumina ...
The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been constructed to be a repository for transuranic (TRU) radioactive wastes generated from the US defense activities. In order to use WIPP as a repository for permanent disposal of TRU waste, the US Department of Energy (DOE) has to demonstrate compliance with the Standards for the Management and Disposal of Spent Nuclear Fuel, High Level and Transuranic Radioactive Wastes'' promulgated by the US Environmental Protection Agency (EPA) in the US Code of Federal Regulations 40 CFR Part 191. The DOE initially plans to perform experiments with a small quantity of waste at WIPP and would like to bring additional quantities for operational demonstration'', before determining whether WIPP is to be a repository for permanent disposal. There are serious problems in pursuing this course of action from an operational point of view. It would be wiser to take the ...
More details about the construction of the Terra Nova floating production, storage and offloading (FPSO) vessel are provided. The vessel was built in the Daewoo shipyard in South Korea, and is now undergoing final fitting at Bull Arm, near St. John's, Newfoundland. When complete, the vessel will operate 350 km offshore, southeast of St. John's. It is 291 metres long and 45.5 metres wide and has a capacity of 960,000 barrels of oil. Although the FPSO will hold less than half of the last giant supertanker which sailed for Irving Oil, it has a crew of 81, four times the size of the supertanker, reflecting the technical uniqueness of the vessel and the intense pre-occupation with safety associated with the combination of winds, ice, waves, and shallow water around the Grand Banks. Also described is the alliance system of partnership between the oil companies and the main contractors. The deal stipulates that if the project ran ...
Husky Oil Operations Ltd (Husky) is considering the development of the South White Rose Expansion (SWRX) area, located approximately 4 km south of the current Southern Glory Hole (SGH) in approximately 120 m of water. Within the new glory hole, one new drill centre will be constructed with wells tied back and into the SGH manifolds. The SWRX drill centre will comprise three horizontal production wells and two horizontal water injection wells with expansion capacity for eight wells. Husky is intending to submit a Development Plan Amendment to the Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB) as part of the development. This document presented the results of a study that assessed the potential impact of the new development on existing White Rose safety studies. The study reviewed existing safety studies that were developed for the White Rose project to determine the potential impact of the new SWRX development. These studies ...
This report has reviewed the construction of a cooling tower for the K reactor at the DOE Savannah River Site in Aiken, South Carolina. It has been found that the cooling tower would prevent further destruction of cypress and tupelo trees, would maintain a more consistent flow from site streams, and would allow earlier recovery of stream corridors inside a portion of the site. About 630 acres of wetlands have already been affected by the hot water discharged by the K reactor during the past 35 years. GAO believes that about 10 to 12 acres of additional damage would be prevented by the tower for every year the reactor is operated, and if current plans for re-start and retirement of the reactor are followed, less than 100 acres would be preserved. As requested, GAO also identified an example of a project that could be funded as compensation to the public for the damage the K reactor would do if Congress exempted it from the Clean Water Act and ...
Argentina has two operating PHWR nuclear power plants. Atucha I NPP is a pressure vessel type heavy water reactor of 360 MW e with 25 years of operation and Embalse NPP is a pressure tube type CANDU-600 reactor of 640 MW e. Atucha II, a third plant of 600 MW e of the pressure vessel type similar to Atucha I, is being constructed. NASA (Nucleoelectrica Argentina S.A.) currently operates both nuclear power plants. The National Atomic Energy Commission (Comision Nacional de Energia Atomica - CNEA) provides operational support to the plants, including research and development assistance, and actual technical services and maintenance work in different areas. The Chemistry Department, formerly the Reactor Chemistry Department has carried out project and support activities to the plants during the past 20 years. The aim of this work is to describe the present organization and the activities in reactor chemistry of the Chemistry Department. In ...
Prepared to make housing project managers, maintenance engineering staff, and designers and architects of HUD - assisted and HUD - insured housing projects and mobile home parks aware of their responsibilities under the Natural Gas Pipeline Safety Act, this handbook provides technical guidance for the reduction of gas leaks and the handling of gas leak incidents in residential areas. The hazards of natural gas, concern over gas safety in residential areas, applicable codes and standards, and sources of information and help are reviewed, along with maintenance and engineering considerations relating to gas pipe failures, the detection of gas leaks, appliance servicing, and pipe installation, repair, and replacement. Housing management considerations are also examined, with attention to recordkeeping and reporting, emergency contingency planning, tenant education, staff qualifications and training, and the development and use of a maintenance and ...
The goal of the Fifteenmile Creek Habitat Improvement project is to improve wild winter steelhead habitat in the Fifteenmile Creek Basin. This goal was addressed under the Columbia River Basin Fish and Wildlife Program, Measure 703 (c) (1) - Action Item 4.2. Construction of fish habitat structures was completed on approximately 3.5 miles of Eightmile Creek and on approximately 8.5 miles of Fifteenmile Creek. A total of 15,435 yds of rock was placed to improve rearing and spawning habitat, and to improve water quality and reduce siltation. Riparian protection fencing was completed on 1.8 miles of Dry Creek, approximately 1.75 miles on Eightmile Creek, and 4.75 miles on Fifteenmile Creek. Approximately 10 miles of stream will receive protection from the 8 miles of new fencing installed and 6.5 miles of abandoned fence repaired. Irrigation withdrawal screens were installed at six irrigation pump withdrawals. These screens functioned satisfactorily ...
A program is currently in progress at Argonne National Laboratory to evaluate and develop evaporator technology for concentrating radioactive waste streams. By concentrating radioactive waste streams, disposal costs can be significantly reduced. To effectively reduce the volume of waste, the evaporator must achieve high decontamination factors so that the distillate is sufficiently free of radioactive material. One technology that shows a great deal of potential for this application is being developed by LICON, Inc. In this program, Argonne plans to apply LICON`s evaporator designs to the processing of radioactive solutions. Concepts that need to be incorporated into the design of the evaporator include, criticality safety, remote operation and maintenance, and materials of construction. To design an effective process for concentrating waste streams, both solubility and vapor-liquid equilibrium data are needed. The key issue, however, is the high decontamination ...
The objectives of this project are to support the DOE direct coal liquefaction process development program and to improve the useful application of analytical chemistry to direct coal liquefaction process development. Independent analyses by well-established methods will be obtained of samples produced in direct coal liquefaction processes under evaluation by DOE. Additionally, analytical instruments and techniques which are currently underutilized for the purpose of examining coal-derived samples will be evaluated. The data obtained from this study will be used to help guide current process development and to develop an improved data base on coal and coal liquids properties. A sample bank will be established and maintained for use in this project and will be available for use by other researchers. The reactivity of the non-distillable resids toward hydrocracking at liquefaction conditions (i.e., resid reactivity) will be examined. From the ...
A novel zinc-air battery might soon enhance the mileage and applications of electric vehicles. The battery named Zoxy battery weighs 80% less than a conventional lead battery, but has an equal amount of energy in store. (orig./CB) [Deutsch] Eine neuartige Zink-Luft-Batterie koennte vor allem dem Elektroauto groessere Reichweiten und neue Einsatzmoeglichkeiten erschliessen. Die sogenannte Zoxy-Batterie ist 80% leichter als eine herkoemmliche Bleibatterie - bei gleichem Energiegehalt. (orig.)
The Nuclear Renaissance is stumbling at the very same time it should speed up in order to help control the climate change and meet a fast growing energy need in a large part of the world. Rising costs of projects, uncertainties about their completion, rocketing safety requirements, and financial constraints are key factors which slow down the Nuclear Renaissance. Furthermore, the legal infrastructure required from any country to enter a commercial nuclear programme (safety authorities, fuel cycle, and waste disposal) is a major hurdle s which impedes consideration for small to mid size reactors, well suited for many countries. The paper prepared and presented by Alain Bugat (Chairman of NucAdvisor and former Head of the French Atomic Energy Commission), Dominique Vignon (CEO of NucAdvisor and former President and CEO of AREVA NP) and Michel Lecomte (Co-founder NucAdvisor) reviews the present status of the Nuclear Renaissance. Based on an analysis of initial versus ...
A High Performance Power System (HIPPS) is being developed. This system is a coal-fired, combined cycle plant with indirect heating of gas turbine air. Foster Wheeler Development Corporation and a team consisting of Foster Wheeler Energy Corporation, Bechtel Corporation, University of Tennessee Space Institute and Westinghouse Electric Corporation are developing this system. In Phase 1 of the project, a conceptual design of a commercial plant was developed. Technical and economic analyses indicated that the plant would meet the goals of the project which include a 47 percent efficiency (HHV) and a 10 percent lower cost of electricity than an equivalent size PC plant. The concept uses a pyrolysis process to convert coal into fuel gas and char. The char is fired in a High Temperature Advanced Furnace (HITAF). The HITAF is a pulverized fuel-fired boiler/air heater where steam is generated and gas turbine air is indirectly heated. The fuel gas ...
The overall objective of this project is the three phase development of an Early Entrance Coproduction Plant (EECP) which uses petroleum coke to produce at least one product from at least two of the following three categories: (1) electric power (or heat), (2) fuels, and (3) chemicals using ChevronTexaco's proprietary gasification technology. The objective of Phase I is to determine the feasibility and define the concept for the EECP located at a specific site; develop a Research, Development, and Testing (RD&T) Plan to mitigate technical risks and barriers; and prepare a Preliminary Project Financing Plan. The objective of Phase II is to implement the work as outlined in the Phase I RD&T Plan to enhance the development and commercial acceptance of coproduction technology. The objective of Phase III is to develop an engineering design package and a financing and testing plan for an EECP located at a specific site. The ...
Roller compacted concretes (RCC) were developed for the Norwegian Skjerka hydropower project. RCCs were developed to have a high-volume fly ash content to address environmental issues, including the reduction of carbon dioxide emissions associated with dam construction. They also makes good use of waste product and conserve natural resources. This study examined a series of mixtures to determine the appropriateness of using RCC as a competing alternative to the traditional rock fill dam proposed for the Skjerka hydropower project. The main advantage of RCC is speed, allowing a relatively large dam to be constructed in just one summer season, saving financial costs and providing early return on the investment. In addition, fly ash can be used in the structure, using clean and renewable energy. Several procedures to proportion RCC mixtures were proposed, including the optimal paste volume method which is ...
A study of advancements in power plant designs for use at geothermal resources in the low to moderate (300 to 400F) temperature range is reported. In 3 case studies, the benefits of R and D to achieve these advancements are evaluated in terms of expected increases in installed geothermal generating capacity over the next 2 decades. A parametric sensitivity study is discussed which analyzes differential power development for combinations of power plant efficiency and capitol cost. Affordable tradeoffs between plant performance and capital costs are illustrated. The independent review and analysis of the expected costs of construction, operation and maintenance of the Heber Binary Cycle Geothermal Power Demonstration Plant are described. Included in this assessment is an analysis of each of the major cost components of the project, including (1) construction cost, (2) well field development costs, (3) fluid purchase costs, ...
After having recalled the formal convergence of the semi-classical multi-species Boltzmann equations toward the multi-species Euler system (i.e. mixture of gases having the same velocity), we generalize to this system the closure relations proposed by B. Despres and by F. Lagoutiere for the multi-components Euler system (i.e. mixture of non miscible fluids having the same velocity). Then, we extend the energy relaxation schemes proposed by F. Coquel and by B. Perthame for the numerical resolution of the mono-species Euler system to the multi-species isothermal Euler system and to the multi-components isobar-isothermal Euler system. This allows to obtain a class of entropic schemes under a CFL criteria. In the multi-components case, this class of entropic schemes is perhaps a way for the treatment of interface problems and, then, for the treatment of the numerical mixture area by using a Lagrange + projection scheme. Nevertheless, we have to find a good ...
... Construction, Geology, and Aquifer Testing of the Maalo ... 8-98) Prescribed by ANSI Std Z39-18 Page 3. Construction, Geology, and Aquifer Testing ...
This book covers representative projects in each program within the Department of Energy. The projects included were selected to provide an insight into the wide spectrum of projects authorized and under way in the Department. The projects described do not cover all projects authorized - they are merely representative. Descriptions, goals, and status are given for 29 energy projects, 4 scientific projects, and 5 defense projects. (RWR)
The Terra Nova offshore oil project is described, with emphasis on the construction of the Terra Nova Floating Production Storage and Offloading (FPSO) vessel, the first such vessel constructed for the harsh environment of the North Atlantic off Newfoundland, the site of an oil field that is expected to produce 125,000 to 150,000 barrels of oil per day starting in 2001. The vessel has a double-hull, made of 3,000 tons of reinforced steel to protect it from ice in the form of massive icebergs or crusty 'packs'. The vessel has the world's largest quick release turret, meaning that the vessel can be quickly disconnected from its turret and mooring in the event of an encroaching iceberg, and then reconnected in an environmentally sound way. Apart from its extremely rugged construction, protecting the FPSO vessel against icebergs is accomplished by way of 'hosing ...
A common practice of electric utilities experiencing transmission and distribution (T and D) system overloads is to expand the substation, add lines, or upgrade equipment, all of which are capital intensive options. In 1988, it was hypothesized that strategically sited photovoltaics (PV) could benefit parts of T and D systems near or at overloaded conditions. An evaluation methodology was developed and applied to a test case (Kerman Substation near Fresno, California). Analytical results suggested that the value of PV to the T and D system could substantially exceed its energy and generation capacity value. The importance of this finding indicated the need for empirical validation. This led to the construction of a 0.5 MW PV demonstration plant by Pacific Gas and Electric Company (PG and E) at Kerman, California as part of the PVUSA (PV for Utility Scale Applications) project. PVUSA is a national public-private partnership that is assessing and ...
The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which ...
The aim of the project is to study the conditions and processes occurring in permanently frozen crystalline bedrock, with special reference to deep (i.e., several hundreds of meters) bedrock conditions. The target of the study is the Lupin mine in Nunavut Territory, Northern Canada. The results may be utilized in assessing the long-term performance of deep underground constructions (e.g., nuclear waste repositories) in cooling climatic conditions. In Phase I of the project versatile background information was collected from the site e.g., on climate, geology and on hydrogeological and hydrogeochemical conditions. During Phase II a broad range of research was conducted including (i) electromagnetic soundings to investigate the distribution of permafrost in the surroundings of the mine; (ii) drilling of three research boreholes at the base of the permafrost for groundwater research; (iii) application of borehole video surveys ...
The Northeast Gateway Energy Bridge Deepwater Port project was commissioned in 2005 and is based on a proprietary energy bridge shipboard regasification technology. The offshore liquefied natural gas (LNG) facility will be located in federal waters 13 miles southeast of Gloucester and was designed to cope with the extreme weather of the Massachusetts Bay. A dual-buoy system will be capable of ensuring continuous delivery of natural gas. Throughput capacity will range from 400 to over 800 MMcf/d. Vessels used at the port have capacities of 138,000 m{sup 3} and 150,900 m{sup 3} with peak sendout rates of 600 MMcf/d. The vessels have the capacity to rapidly increase and decrease their delivery rates. During periods of peak demand, 2 vessels can be simultaneously accommodated at the port, which has been designed to accommodate larger vessels to maximize future throughput. This presentation presented details of the port's design phases and the review processes ...
A real-time neutron radiography facility was constructed including the capability of neutron tomography. The neutron beam was measured for total neutron flux ((1.0 +/- 0.2) x 10/sup 11/ m/(m/sup 2/-sec)), gold cadmium ratio (52 +/- 3) and effective neutron temperature (83/sup 0/C +/- 8/sup 0/C). The angular divergence or nonparallelism of the neutron beam was measured to be 2.3/sup 0/ +/- 0.1/sup 0/ thereby providing a means of quantifying the collimator effectiveness. The resolution capabilities of both static film and real-time neutron radiographs were quantified using a Fourier transform algorithm to calculate the modulation transfer function of both types of radiographs. The contrast sensitivity of both types of radiographs. The contrast sensitivity of both types of radiographs was measured as 3.1% for film and 4.0% for real-time radiographs. Two tomography algorithms, the simultaneous iterative reconstruction technique (SIRT) and the convolution method, were ...
A real-time neutron radiography facility was constructed including the capability of neutron tomography. The neutron beam was measured for total neutron flux ((1.0 +/- 0.2) x 10"1"1 m/(m"2-sec)), gold cadmium ratio (52 +/- 3) and effective neutron temperature (83"0C +/- 8"0C). The angular divergence or nonparallelism of the neutron beam was measured to be 2.3"0 +/- 0.1"0 thereby providing a means of quantifying the collimator effectiveness. The resolution capabilities of both static film and real-time neutron radiographs were quantified using a Fourier transform algorithm to calculate the modulation transfer function of both types of radiographs. The contrast sensitivity of both types of radiographs. The contrast sensitivity of both types of radiographs was measured as 3.1% for film and 4.0% for real-time radiographs. Two tomography algorithms, the simultaneous iterative reconstruction technique (SIRT) and the convolution method, were programmed on an Intellect 100 ...
This project, conducted under The United States Department of Energy (DOE) Cooperative Agreement DE-FC36-94GO10002/A002, was part of a multiple-phase effort to develop technologies that improve the energy efficiency and economics of chemical process recovery in the pulp and paper industry. The approach taken was to consider two major alternatives in two phases. Phase I, conducted previously, considered means to improve pulp mill recovery boilers using high-solids advanced combustion of black liquor; while this project, Phase la, considered means to recover kraft pulping mill process chemicals by low-temperature black liquor gasification. The principal steps previously proposed in this program were: (1) Evaluate these two technologies, high-solids advanced combustion and gasification, and then select a path forward using the more promising of these two options for future work. (2) Design and construct a pilot-scale unit ...
The main businesses of the Aker Group were outlined. The Aker Group has an operating revenue of 51.7 billion with operational experience in deepwater floaters, subsea infrastructure, onshore oil and gas plants, fixed offshore platforms, petrochemical refining, power generation, pulping, and mining. The company plans and executes capital projects, provides technology solutions and life-cycle operations, service and maintenance. The Aker Group owns 50 per cent of the Aker Kvaener offshore drilling rig located in the North Sea. This presentation outlined the challenges of working in a harsh environment. The area is characterized by a short productive season, low temperatures and limited sunlight. The direct environmental issues include spills and the impact of oil and gas infrastructure. Indirect issues include lowering the entry barriers for other kinds of resource exploitation. Other challenges of field development in Arctic areas include ice conditions, extreme ...
The Fermilab Steering Group has developed a plan to keep U.S. accelerator-based particle physics on the pathway to discovery, both at the Terascale with the LHC and the ILC and in the domain of neutrinos and precision physics with a high-intensity accelerator. The plan puts discovering Terascale physics with the LHC and the ILC as Fermilab's highest priority. While supporting ILC development, the plan creates opportunities for exciting science at the intensity frontier. If the ILC remains near the Global Design Effort's technically driven timeline, Fermilab would continue neutrino science with the NOVA experiment, using the NuMI (Neutrinos at the Main Injector) proton plan, scheduled to begin operating in 2011. If ILC construction must wait somewhat longer, Fermilab's plan proposes SNuMI, an upgrade of NuMI to create a more powerful neutrino beam. If the ILC start is postponed significantly, a central feature of the proposed Fermilab plan ...
Site studies for CANDU type NPP began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. A team was charged to develop all packages of the necessary main studies. The first Romanian NPP CANDU 6 type reactor gone to erection on Cernavoda site, planned to have 5 units and, like Wolsong NPP, applied the same design for the nuclear island. For the BOP parts the ANSALDO-GE project was applied with a thorough concern about requirements raised by connection to NSP. The first mission of design and research multi-branch team was to adapt the NPP Cernavoda project having an open water cooling circuit 'once-through' to the new parameters of a close recirculation water cooling circuit. Also, the structural design was re-evaluated for the case of soft foundation strata instead of hard rock ones. The close recirculation water cooling circuit system was ...
One of the NASA research activities was to identify, characterize, and simulate a series of technologies that could be used for hydrogen production at NASA Kennedy Space Center (KSC) using locally available sources. This project examined the production of hydrogen from solar energy. To produce hydrogen by water splitting, the operating voltage of conventional photovoltaic (PV) cells cannot supply the overvoltage required. Thus, the objective of this project was to research and develop photoelectrochemical (PEC) cells that can supply the required voltage for water splitting by constructing a multiple bandgap tandem PV cell and a photocatalyst that can be activated by infrared (IR) photons transmitted through the PV cell. The proposed concept is different from conventional PEC water splitting by using multiple band gap combinations. The advantages for this PEC cell concept is that the PV cells are not in contact with the ...
Faserbewehrter Beton wird heute zunehmend auch bei Tunnelbauwerken (Tunnelinnenschalen, Tubbinge) eingesetzt. Wesentliche Vorteile sind das hohe Tragvermogen, das daraus entstehende Einsparungspotential an herkommlicher stabformiger Bewehrung (Biegebewehrung, Bugelbewehrung in der Randzone), die Aufnahme von Spaltzugbeanspruchungen durch die Fasern, Rissbreitenbegrenzung, erhohte Dauerhaftigkeit, verbesserter Brandwiderstand (insbesondere bei Verwendung von Kunststofffasern), Optimierung der Arbeitsablaufe etc. Neue Entwicklungen in der Betontechnologie haben in den letzten Jahrzehnten den faserbewehrten ultrahochfesten Beton (engl. UHPFRC - Ultra High Performance Fibre Reinforced Concrete) hervorgebracht. Im Rahmen dieser Arbeit wird der Einsatz des ultrahochfesten, stahlfaserbewehrten Be...
Zusammenfassung Hintergrund Endograftimplantationen im oder am Aortenbogen stellen besondere Herausforderungen an die Implantationstechnik und an die mechanischen Eigenschaften von Stentgrafts und ihren Einf?hrungssystemen, bedingt durch die Notwendigkeit, die Prothesen punktgenau abzusetzen und durch die mit der Biegung im Aortenbogen zunehmende Reibungswiderst?nde innerhalb der Einf?hrungssysteme. Die Endograftsysteme der 1. Generation (Talent?, Zenith TX 1?, TAG?) zeigten in dieser Lokalisation technisch bedingte Limitationen. Neue Prothesen Bei den seit 2004 und 2005 verf?gbaren neuen Stentgrafts (E-vita?, Zenith TX 2?, Valiant?, Relay?) sind diese Limitationen weitgehend ?berwunden. Durch technische Verbesserungen von Stentgrafts und Einf?hrungssystemen ist es nun m?glich, auch lange ...
After cooling ceilings and source ventilation, simple air conditioning systems like thermal activation of concrete cores are gaining general acceptance. Parallel to this, ground source cooling systems are reducing the need for cold generation. Air conditioning systems of this type are favoured by producers of floor heating systems looking for a new market segment. [German] Nach Kuehldecken und Quellueftung gewinnen jetzt einfach aufgebaute Raumklimaanlagen, wie die thermische Betonkernaktivierung, immer mehr Anhaenger. Parallel dazu werden Verfahren zur Erdkaeltenutzung entwickelt, die den Anteil kuenstlich erzeugter Kaelte weiter zurueckdraengen. Forciert wird diese Art der Klimatisierung insbesondere durch die Hersteller von Fussbodenheizungen, fuer die sich hier ein neues Marktsegment eroeffnet. (orig.)
Zusammenfassung Das Lungenkarzinom ist eine der h?ufigsten Krebserkrankungen und die h?ufigste Krebstodesursache. Mit der Einf?hrung innovativer Substanzen ist die M?glichkeit einer individualisierten Therapie gegeben, die eine Verbesserung von Prognose und Lebensqualit?t verspricht. Die Wirksamkeit dieser Therapeutika basiert auf spezifischen molekularen Eigenschaften des Lungenkarzinoms und stellt neue Anforderungen an die pathohistologische Diagnostik. Neben dem Histotyp haben sich molekulare Alterationen, insbesondere EGFR-Mutationen, als pr?diktive Marker erwiesen. Die histologische Typisierung umfasst daher nicht nur die Unterscheidung von SCLC und NSCLC, sondern die Subtypisierung der NSCLC unter Einbezug immunhistologischer und molekularer Untersuchungen. Zusammenfassend werden Kri...
Modern tubular type pumps commonly have lubricated radial bearings which require no compressed water supply and reduce the servicing requirements. Problems that may possibly result from entrained sand in the pumped fluid were solved with the development of ceramic Residur {sup trademark} bearngs in the early eighties. (orig.) [German] In zunehmendem Masse werden Rohrgehaeusepumpen mit foerdermediumgeschmierten Radiallagern ausgestattet, da dies z.B. neben dem Wegfall einer ansonsten notwendigen Druckwasserversorgung auch einen deutlichen reduzierten Wartungsaufwand nach sich zieht. Den Problemen durch eine moegliche Sandbeladung des Foerdermedium wurde bereits durch die Entwicklung der keramischen Residur {sup trademark} -Lager Anfang der 80er Jahre Rechnung getragen. (orig.)
Coordination chemistry on transition metal chalcogenides offer better conditions for multielectron charge transfer processes on solid/electrolyte interfaces. In this contribution, materials whose band energies are derived from d-states of the transition metal will be shown. Problems related to the reactivity, stability and photoactivity toward the generation and conversion of fuels will also be discussed. (orig.) [Deutsch] Die an halbleitenden Uebergangsmetall-Elektroden beobachtete Koordinationschemie bietet guenstige Voraussetzungen fuer den Mehrelektronen-Transfer an der Festkoerper/Elektrolyt Grenzflaeche. Beispielhaft werden in diesem Beitrag Elektrodenmaterialien vorgestellt, deren Energiebaender sich von d-Zustaenden der Uebergangsmetalle herleiten. Diskutiert werden Probleme der Reaktivitaet, der Stabilitaet und der Photoaktivitaet im Hinblick auf die Erzeugung und Umsetzung von Brennstoffen. (orig.)
Due to size and costs of big slewing rings, the common methods of experimental trial and error together with destructive test methods for verification of the inductive hardening process are limited. Thereby it is essential to simulate the hardening process in addition to the tests. With these simulations, it should be possible to get conclusions for the hardening pattern, the residual stress and distortion. With actually existing methods a fully three dimensional simulation is extremely time consuming. For that reason, a new method was developed that combines two dimensional with three dimensional simulation to shorten the time for calculation tremendously. (orig.)
Mechanical ventilation in private homes was for many years a stepchild of air conditioning engineers. A decisive impulse for change came in January 1995 with the enactment of the new Thermal Insulation Ordinance which for the first time allows house owners to exceed the usual admissible annual heating requirement by a certain amount on the condition that they equip the house with mechanical ventilation systems. (orig.) [Deutsch] Ueber lange Jahre war die mechanische Wohnungslueftung ein Stiefkind der Raumlufttechnik. Einen entscheidenden Impuls gab erst die seit Januar 1995 gueltige Waermeschutzverordnung, die erstmals zulaesst, dass ein gewisses Quantum des Jahres-Heizwaermebedarfs durch den Einbau mechanischer Wohnungslueftungen kompensiert werden kann. (orig.)
Despite the current global economic crisis, the Cleantech industry has excellent growth prospects. Especially technologies for water treatment, energy efficiency in buildings and combined heat and power will face high demand and high growth rates in the coming years, just like the suppliers for the wind and solar industry. Today German companies are market leaders in these segments. However, there is a threat that they will lose this competitive position as international competition increases. Besides attractive incentive schemes and regulatory framework, access to venture capital and the fast expansion to international markets is an important factor to secure the leading market position of German Cleantech companies. (orig.)
The present design of Blanket Shield and Primary Wall for ITER envisages construction of the wall with a water cooled, stainless steel outer layer and a water cooled, copper liner on the inside plasma facing surface. Protection of the inner copper surface with an armour layer is necessary to cope with plasma to wall interaction. There are a number of armour materials under consideration, for this project beryllium was used. The scope of work was to produce a series of mock-ups, each consisting of a different combination of materials, which included Dispersion Strengthened Copper, Copper-Chrome-Zirconium alloy, Beryllium and Stainless Steel. Hot Isostatic Pressing (HIP) was the method used to ensure that a fully diffused bonded joint was achieved giving the necessary strength and thermal conductivity. The first five of the mock ups have been successfully completed and are being tested at the various laboratories in Europe. The remaining mock ups ...
Using an economic perspective, it is possible to make a case for green buildings and green development practices by placing emphasis on Energy Efficiency and Environmental Design. Several case studies have demonstrated that green buildings save money through reduced consumption of natural resources, electricity and gas both at the building site and at the source of energy. Sound environmental practices and energy efficiency measures improve the environmental conditions throughout the state by reducing power plant emissions and reducing operations and maintenance budgets in the state. The author presented a case study where a green development project was guided and monitored using the Environmental Performance Rating System called Leadership in Energy and Environmental Design (LEED), version 2.0. The work was registered to achieve LEED certification. A brief study on current construction related costs was also included. 2 refs., 1 fig.
In the future even more than in the past, nuclear power will be indispensable in the present industrialized countries and in those still under development. The safe, nonpolluting, and economic supply of energy to mankind in the future includes so many different problems that the technology of the high-temperature reactor at its present level of development, and with the possibilities is offers above and beyond those provided by other, established, technologies, does not have to mark the end of some old line of development, but rather should be seen as the starting point of a development offering promise for the future. It is for this very reason that the extensive, valuable knowledge and experience accumulated in the construction, operation, and decommissioning of the AVR and THTR plants, the development of the HTR module and other variants and, last, but not least, the valuable results of projects such as PNP, NFE, and HHT, must be preserved ...
We present results of the search for Cepheids in the galaxy IC1613 carried out as a sub-project of the OGLE-II microlensing survey. 138 Cepheids were found in the 14.2x14.2 arcmin region in the center of the galaxy. We present light curves, VI photometry and basic data for all these objects, as well as color-magnitude diagram of the observed field. The Period--Luminosity (PL) diagrams for IC1613 fundamental mode Cepheids for VI and interstellar extinction insensitive index W_I are constructed. Comparison of PL relations in metal poor galaxy IC1613 ([Fe/H]~-1.0 dex) with relations in metal richer Magellanic Clouds allows us to study dependence of Cepheid PL relations on metallicity in the wide range of metallicities covered by these three galaxies. The slopes of PL relations in IC1613 are identical as in the Magellanic Clouds. The comparison of brightness of Cepheids with the magnitudes of the tip of the red giant branch stars and RR Lyr stars ...
Long-term disposal and management of low and intermediate-level radioactive waste is a major project of the nuclear power industry. Therefore, the selection of an underground waste repository has to be a geologically and seismologically stable storage. Easy transportation and emplacement is essential. The Wolsung nuclear power plant (NPP) of unit no. 1/2/ 3/ 4, which is responsible for the future of the energy industry, has already been constructed at the Wolsung site and a New NPP has recently been created at the Sinwolsung site. Radioactive waste used in the plant facilities, has piled up increasingly every year, but it should be taken to be managed at long-term underground storage disposal facilities. The Wolsung site for radioactivity waste repository was known to be relatively stable through various geological surveys, earthquakes, groundwater, engineering testing and analysis, but still more research related to the stability of the ...
Long-term disposal and management of low and intermediate-level radioactive waste is a major project of the nuclear power industry. Therefore, the selection of an underground waste repository has to be a geologically and seismologically stable storage. Easy transportation and emplacement is essential. The Wolsung nuclear power plant (NPP) of unit no. 1/2/ 3/ 4, which is responsible for the future of the energy industry, has already been constructed at the Wolsung site and a New NPP has recently been created at the Sinwolsung site. Radioactive waste used in the plant facilities, has piled up increasingly every year, but it should be taken to be managed at long-term underground storage disposal facilities. The Wolsung site for radioactivity waste repository was known to be relatively stable through various geological surveys, earthquakes, groundwater, engineering testing and analysis, but still more research related to the stability of the ...
The Synchrotron Resource of the Howard Hughes Medical Institute will be dedicated to structural analyses of biological macromolecules, primarily through crystallography. This facility is under construction at the X4 port of the National Synchrotron Light Source at Brookhaven National Laboratory, and it will comprise three beamlines. The first line to be built has been devised to apply the multiwavelength anomalous diffraction method which provides direct estimates for the phases of reflections. The second line will be devoted to rapid and essentially routine diffraction measurements, mainly through the rotation method. These two experimental stations are contained within refrigerated radiation enclosures that will maintain clean environments, narrowly defined constant temperatures, and protection against biohazard at biosafety level BL-2. At the same time as the second line will be developed, the swath center is planned to first serve as a monitor of the white ...
It is necessary to establish scenarios for reducing CO2 emissions and for developing CO2 emission control technologies to obtain a global consensus, using appropriate analytical models. For modification of the DNE-21 (Dynamic New Earth 21) model, it has a category designated as innovative technologies not involving CO2 emission and an optional consideration for the absorption of atmospheric CO2 by biomass. A global carbon circulation model, including vegetation in its scope, is also incorporated. Major results of the simulation are shown. When 20% reduction in CO2 emissions is required for only OECD countries after the year 2020, it has been demonstrated that CO2 concentration in the atmosphere will reach as high as about 900 ppm in 2100 due to CO2 emission by developing countries, and will not be a tolerable level. Under the condition that CO2 concentration in the atmosphere is controlled at 450 ppm in 2100, the amount of renewable source of energy from photovoltaic power generation ...
The Sunyaev-Zeldovich (SZ) effect gives a measure of the thermal energy and electron pressure in groups and clusters of galaxies. In the near future SZ surveys will map hundreds of systems, shedding light on the pressure distribution in the systems. The thermal energy is related to the total mass of a system of galaxies, but it is only a projection that is observed through the SZ effect. A model for the 3D distribution of pressure is needed to link the SZ signal to the total mass of the system. In this work we construct an empirical model for the 2D and 3D SZ profile, and compare it to a set of realistic high resolution SPH simulations of galaxy clusters and groups, and to a stacked SZ profile for massive clusters derived from WMAP data. Furthermore, we combine observed temperature profiles with dark matter potentials to yield an additional constraint, under the assumption of hydrostatic equilibrium. We find a very tight correlation between the ...
The Wind Energy Research Division of Sandia National Laboratories has been funded by the Wind/Ocean Technology Division of the Department of Energy (DOE) to design and build a 34-meter diameter Vertical Axis Wind Turbine (VAWT). The turbine design incorporates the results of recent VAWT research in aerodynamics and structural dynamics. Initial system concept studies identified several blade options that met the required power rating of 500 kW. The final blade and rotor configurations were chosen based on finite element calculations that determined the turbine modes of response, their frequency of vibration, and stress levels. For parked survival turbine components were designed to with stand the loading of a 150 mph (67.0 m/s) wind coupled with maximum cable tensions. Specific areas of design discussed include the rotor, cables, bearings, brakes, and foundations. Construction of the turbine is in progress at this time and anticipated completion of the ...
The contribution outlines the current status of the building constructionprojects for the German Bundestag in Berlin. The following subjects are discussed: Energetic quality of the building, energy supply concept, integrated energy supply system, electric CHP systems, cogeneration (vegetable oil), aquifer storage (heat storage, cold storage), solar energy (photovoltaic energy conversion, thermal solar energy use), economic and ecological aspects. (HW) [Deutsch] Der vorliegende Beitrag gibt einen Ueberblick ueber den aktuellen Stand des Bauvorhabens des Deutschen Bundestages in Berlin. In diesem Zusammenhang wird auf folgende Themen eingegangen: Energetische Gebaeudequalitaet, Energieversorgungskonzept, Energieverbund, stromgefuehrte BHKWs, Kraft-Waerme-Kopplung (Pflanzenoel), Aquiferspeicher (Waermespeicher, Kaeltespeicher), Sonnenergienutzung (Photovoltaik, thermische Solarenergienutzung), Wirtschaftlichkeit und Oekologie. (HW)
number of technical requirements and performance criteria can drive stellarator costs, e.g., tight tolerances, accurate coil positioning, low aspect ratio (compactness), choice of assembly strategy, metrology, and complexity of the stellarator coil geometry. With the completion of a seven-year design and construction effort of the National Compact Stellarator Experiment (NCSX) it is useful to interject the NCSX experience along with the collective experiences of the NCSX stellarator community to improving the stellarator configuration. Can improvements in maintenance be achieved by altering the stellarator magnet configuration with changes in the coil shape or with the combination of trim coils? Can a mechanical configuration be identified that incorporates a partial set of shaped fixed stellarator coils along with some removable coil set to enhance the overall machine maintenance? Are there other approaches that will simplify the concepts, improve access for ...
A number of technical requirements and performance criteria can drive stellarator costs, e.g., tight tolerances, accurate coil positioning, low aspect ratio (compactness), choice of assembly strategy, metrology, and complexity of the stellarator coil geometry. With the completion of a seven-year design and construction effort of the National Compact Stellarator Experiment (NCSX) it is useful to interject the NCSX experience along with the collective experiences of the NCSX stellarator community to improving the stellarator configuration. Can improvements in maintenance be achieved by altering the stellarator magnet configuration with changes in the coil shape or with the combination of trim coils? Can a mechanical configuration be identified that incorporates a partial set of shaped fixed stellarator coils along with some removable coil set to enhance the overall machine maintenance? Are there other approaches that will simplify the concepts, improve access for ...
The purpose of this project was to design, build, and characterize the performance of a volume breast ultrasound (VBUS) scanner that images the pendant breast. VBUS scanner design includes a: 1) clinical ultrasound scanner and transducer; 2) scanning table with a hole for the pendant breast; 3) rotational gantry; 4) probe mounting assembly; 5) compressionless breast stabilization device; 6) acquisition, control, reconstruction, and display software. Performance assessment characterized a variety of parameters including: spatial resolution, uniformity, and distortion using high and low contrast test objects in both horizontal and vertical scanning modes. The VBUS scanner modules have been constructed and initial performance evaluated. Approximately 300 scans are acquired over 360 degrees in 18 seconds. Reconstruction requires 25 ms per slice. Test object images depicted hyper- and hypo-echoic masses and demonstrated good resolution, soft tissue ...
KM3NeT is a future deep-sea research infrastructure hosting a neutrino telescope with a volume of at least one cubic kilometer to be constructed in the Mediterranean Sea. The experiment aims to detect high-energy cosmic neutrinos using a 3D array of optical modules to collect the Cherenkov light induced by charged particles in the water. Upward going muons and showers produced in neutrino interactions with the surrounding matter will allow the search and study of possible sources of extra-terrestrial neutrinos. The design of optical modules makes an important impact on the performance and cost of the KM3NeT project. Several different optical module configurations are under consideration; based on glass pressure spheres containing: a large (10 in.) hemispherical photomultiplier tube (with a multi-anode version as an option); 25-31 3 in. photomultiplier tubes, or a crystal scintillator-based hybrid device (X-HPD). The features and advantages of ...
Given an invariant gauge potential and a periodic scalar potential \\tilde{V} on a Riemannian manifold \\tilde{M} with a discrete symmetry group \\Gamma, consider a \\Gamma-periodic quantum Hamiltonian \\tilde{H}=-\\tilde{\\Delta}_{B}+\\tilde{V} where \\tilde{\\Delta}_{B} is the Bochner Laplacian. Both the gauge group and the symmetry group \\Gamma can be noncommutative, and the gauge field need not vanish. On the other hand, \\Gamma is supposed to be of type I. To any unitary representation \\Lambda of \\Gamma one relates a Hamiltonian H^{\\Lambda}=-\\Delta_{B}^{\\Lambda}+V on M=\\tilde{M}/\\Gamma where V is the projection of \\tilde{V} to M. We describe a construction of the Bloch decomposition of \\tilde{H} into a direct integral whose components are H^{\\Lambda}, with \\Lambda running over the dual space \\hat{\\Gamma}. The evolution operator and the resolvent decompose correspondingly. Conversely, given \\Lambda\\in\\hat{\\Gamma}, one can ...
A discussion of how stress and strain affect the quantities which can be measured in an NQR experiment shows that, for stresses of the magnitude to be expected at depths up to about 10,000 feet, quadrupole coupling constants will fall in the range of 1 to 10 kHz for both the sodium and chloride ions in NaCl. The most promising system involves pulsed nuclear double resonance detection; and alterative is to observe the quadrupolar splitting of the NMR signal. Choices to be made in the measurement and mapping techniques are discussed. The well-known perturbation of the homogenous stress field in the neighborhood of a borehole is shown to be advantageous from the point of view of obtaining directional information on the stress. Construction and operation of a borehole stress sensor are considered. The NQR technique seems feasible for measuring the magnitude and direction of underground stress with a resolution of about 25 psi, or 2.5% at 1000 psi. Downhole ...
This report presented some quick facts about oil and gas pipelines in Turkey and presented opportunities for trade. The key players and customers in the oil and gas sector were described along with an export check list. Turkey is looking into becoming an energy bridge between oil and gas producing countries in the Middle East, Central Asia and Europe. The oil and gas sectors are dominated by the Turkish Petroleum Corporation, a public enterprise dealing with exploration and production, and the State Pipeline Corporation which deals with energy transmission. They are also the key buyers of oil and gas equipment in Turkey. There are several pipelines connecting countries bordering the Caspian Sea. Opportunities exist in the areas of engineering consulting as well as contracting services for oil and gas pipeline transmission and distribution. Other opportunities lie in the area of pipeline construction, rehabilitation, materials, equipment, installation, and ...
Atomic Energy of Canada Limited (AECL) operates the Waste Treatment Centre (WTC) to treat and immobilize some of the low- level radioactive waste (LLRW) streams at the Chalk River Laboratories (CRL). The WTC at treats low- level radioactive liquid waste by removing the contaminants from the wastewater, concentrating them, and immobilizing them. The fundamental design concept for the WTC is to process the waste streams using forced circulation type liquid waste evaporation (LWE), to solidify the concentrates using thin film evaporator and to discharge the purified effluent into the Ottawa River following verification monitoring. The solidified product drums are stored in existing storage facilities in the CRL. The LWE was installed in the WTC to treat the LLRW. After about four (4) years of design, construction and cold commissioning, the active commissioning of the evaporator process using radioactive waste streams commenced in February 2000. The LWE has overcome ...
Atomic Energy of Canada Limited (AECL) operates the Waste Treatment Centre (WTC) to treat and immobilize some of the low- level radioactive waste (LLRW) streams at the Chalk River Laboratories (CRL). The WTC at treats low- level radioactive liquid waste by removing the contaminants from the wastewater, concentrating them, and immobilizing them. The fundamental design concept for the WTC is to process the waste streams using forced circulation type liquid waste evaporation (LWE), to solidify the concentrates using thin film evaporator and to discharge the purified effluent into the Ottawa River following verification monitoring. The solidified product drums are stored in existing storage facilities in the CRL. The LWE was installed in the WTC to treat the LLRW. After about four (4) years of design, construction and cold commissioning, the active commissioning of the evaporator process using radioactive waste streams commenced in February 2000. The LWE has overcome ...
Certain innovative coke-oven repair techniques are reviewed that represent an engineered approach to a successful rehabilitation of all types of coke-oven batteries. These techniques have been developed during the last 10 years and experience gained on a number of repair projects has shown that these techniques operate as a cohesive and comprehensive method of end flue and through-wall repairs to gain additional years of operating life to coke-oven batteries. Extended operations approaching 10 to 15 additional years of service at lower costs than a pad-up rebuild and, while meeting the environmental emission regulations, are attainable using the techniques of: Proper tie-in joint preparation; Improved bricking up methodology; Preheating refractory during bricking up; Installation of spring-loaded bracing system; and installation of flexible coke-oven doors. Repair methods that do not incorporate the above techniques are subject to premature failure of the ...
In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ to acceptable regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and ...
The American Natural Resources System has been attempting to obtain the financing commitments and regulatory approvals necessary to construct the nation's first commercial-scale coal-gasification plant. It would employ the same technology as Sasol plants of South Africa and much of the same hardware as the Sasol II plant now approaching completion. But instead of converting the gas that comes out of the gasifier vessels into liquid hydrocarbons, the proposed plant would upgrade the gas to a Btu-content equivalent to that of natural gas. It could be mixed, transported, and utilized as a constituent part of the natural gas stream. The plant would be located in North Dakota and would utilize coal as the feedstock. North Dakota lignite gasifies very efficiently and, since the plant would be located at the mine mouth, the low-Btu quality of the coal is not a particularly adverse factor. The gas produced by the plant would be transported by a new pipeline to one ...
This report describes the fiscal 1998 result on development of genome informatics technology. As comparative analysis technique of genes, the combination of electrophoresis and PCR was used. For improvement of the throughput and reproducibility of the technique, module- shuffling primers were used, and the multi(96)-arrayed capillary fragment analyzer was devised. The system detecting SNPs rapidly was also developed successfully. As analysis technology of DNA sequence by use of triple- stranded DNA formation, study was made on construction of long cDNA libraries, selective subtraction of specific sequences from libraries, and the basic technology of homologous cloning. Study was also made on each reaction step of IGCR technique for fast analysis, and specifications of a fluorescence transfer monitor. As modeling technique of genetic sequence information, the simulation model was developed for gene expression regulatory networks during muscle differentiation, and ...
Proof-of-principle experiments are reported for a new concept in electrically rechargeable zinc-air battery. The zinc electrode is a porous flow-thru type using a copper foam metal substrate with zinc deposition onto the foam metal from concentrated zincate electrolyte (as used in zinc-slurry type batteries). The bifunctional air electrode employs low-cost materials, being fabricated entirely from carbon-based precursors and small amounts of nickel and/or cobalt oxide. Corrosion measurements on the graphite materials in the air electrode indicate sufficient corrosion resistance for 8000 h life on charge. A prototype single cell was constructed having 1.5 Ah capacity producing 1.2 V discharge -2.0 charge at the three hour rate and has produced stable voltages for more than 150 cycles. Based on the 1.5 Ah prototype characteristics, design calculations for a 32 kWh battery project an energy density of about 110 Wh/kg, peak power density of 140 ...
For the purpose of proposing it to ISO, the R and D were conducted of a new evaluation method of thermal properties of polymer materials. The FY 1999 results were summarized. In this fiscal year, the development of the ac Joule heating equipment was proceeded with based on the study at the technical committee, and the measuring device was installed. In the comparative measurement with conventional methods, study was proceeded with of the laser flash method, AC calorimetry method and specific heat measurement. In the technical survey, the developmental state of the ac method, especially, was examined as a testing method of thermal properties of polymer materials. It is in the stage of the basic research by keyword selection, and the search for literature is to be made in full scale. As to the needs in the industrial circle, as a result of the questionnaire survey made, it was found out that there were a wide variety of the needs for general-purpose/functional film materials, forming ...
We have begun the ExploreNEOs project in which we observe some 700 Near-Earth Objects (NEOs) at 3.6 and 4.5 ?m with the Spitzer Space Telescope in its Warm Spitzer mode. From these measurements and catalog optical photometry we derive albedos and diameters of the observed targets. The overall goal of our ExploreNEOs program is to study the history of near-Earth space by deriving the physical properties of a large number of NEOs. In this paper, we describe both the scientific and technical construction of our ExploreNEOs program. We present our observational, photometric, and thermal modeling techniques. We present results from the first 101 targets observed in this program. We find that the distribution of albedos in this first sample is quite broad, probably indicating a wide range of compositions within the NEO population. Many objects smaller than 1 km have high albedos (?>0.35), but few objects larger than 1 km have high albedos. This ...
This purpose of this report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period April 1, 2005 through June 30, 2005. The following tasks have been completed. First, the new Combustion Laboratory was occupied on June 15, 2005, and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building is in the final painting stage. Second, the fabrication and manufacturing contract for the CFBC Facility was awarded to Sterling Boiler & Mechanical, Inc. of Evansville, Indiana. Sterling is manufacturing the assembly and component parts of the CFBC system. The erection of the CFBC system is expected to start September 1, 2005. Third, mercury emissions from the cofiring of coal and chicken waste was studied experimentally in the laboratory-scale simulated ...
This report is to present the progress made on the project ''Establishment of an Environmental Control Technology Laboratory (ECTL) with a Circulating Fluidized-Bed Combustion (CFBC) System'' during the period January 1, 2005 through March 31, 2005. The following tasks have been completed. First, the renovation of the new Combustion Laboratory is nearly complete, and the construction of the Circulating Fluidized-Bed (CFB) Combustor Building is in the final stages. Second, the fabrication and manufacture of the CFBC Facility is being discussed with a potential contractor. Discussions with potential contactor regarding the availability of materials and current machining capabilities have resulted in the modification of the original designs. The selection of the fabrication contractor for the CFBC Facility is expected during the next quarter. Third, co-firing experiments conducted with coal and chicken waste ...
This paper describes the challenges involved in the construction of a mid-rise housing development in Boston, Massachusetts, during which the development team elected to upgrade the initial design criteria from Minimum Building Code to Energy Star and Leadership in Energy and Environmental Design (LEED) certification. The various constraints imposed on the development were discussed, including constraints imposed by the involvement of substantial public funds as well as the constraints imposed by various funding sources that were approached to leverage energy efficiency and green building investment via competitive grant solicitations. Building owner and utility cost management priorities were outlined along with details of central mechanical system selection. Issues concerning isolation and compartmentalization were examined along with indoor pollution source control. A building load analysis was presented as well as details of daily heating and cooling ...
This Phase 1 final report covers the work performed by Springborn Testing and Research, Inc., for the period October 1, 1997 to June 30, 1998 under the Department of Energy Cooperative Agreement Number DE-FC36-97GO10255, entitled Development of Flame Retardant PV Module Encapsulants. While use of roof-mounted arrays has always been an attractive means of deploying PV, only within recent years have such building integrated concepts (BIPV) found renewed interest among module makers and end-users. Prior to building integrated and rooftop applications, flammability requirements for modules have not been a great industry concern. However, with growing interest in BIPV and the requirement for building code requirements for commercial and industrial structures, flammability issues have become a barrier to entry for many module constructions into this potentially huge domestic market for PV. The overall goal of the 3 phase PV BONUS two project is to ...
There are many requirements for cost analysis and estimating within the Department of Energy (DOE). As projects go through the many stages of planning, source evaluation and selection, contracting, and construction, different estimating requirements exist and different techniques are available to the estimator. This cost guide illustrates how quantity takeoff estimating is performed when adequate design data are available, and it shows how statistics can be applied to obtain parametric cost estimates. Parametric techniques will become increasingly useful as the Department's cost data base and Cost Estimating Relationships (CERs) are developed. Other cost guides developed by the Independent Cost Estimating (ICE) Staff will be published and disseminated soon. The section on parametric cost estimating uses Department of Defense examples since the ICE Staff considered this information to be some of the best available on this subject. Also, ...
A key factor that demands special attention in the pipeline construction is the cold bending process, since 30 to 40% of the pipes use this process in the field. This study aimed to evaluate the X80 cold bending operational parameters, in order make viable the use of this process in the installation of future onshore pipelines. Three 34''OD x 0,750'' pipes were bended. The bending was conducted using a hydraulic equipment with application of equally spaced punches, recording the correspondent angles related to the elastic and plastic deformations in order to assess the spring-back effect and performing dimensional inspection. Samples from pipe and the weld were subjected to mechanical and metallographic tests. It was possible to obtain a 19 deg curve and 27D radius without presenting any evidence of wrinkles, out of roundness or any type of mechanical damage. After analysis, all criteria established from ...
In October 1980, Air Products and Chemicals, Inc. began a three year contract with the DOE: Catalyst and Reactor Development for a Liquid Phase Fischer-Tropsch Process. The program contains four major tasks: (1) Project Work Plan, (2) Slurry Catalyst Development, (3) Slurry Reactor Design Studies, and (4) Pilot Facility Design. This report describes work on Tasks 2 and 3 carried out in the third quarter of the contract. In Task 2, the computerized search of the Fischer-Tropsch literature was continued, and improvements were made in data processing programs. Shakedown tests were completed on the first 300 ml slurry reactor, and construction of the second and third reactors began. Five modified conventional slurry catalysts were prepared, and two batches were tested in the gas phase giving information on selectivity as a function of composition and activation. Four supported cluster catalyst were synthesized, and seven were tested in the gas ...
This publication provides a broad overview of the research programs and efforts being conducted, built, designed, and planned at Brookhaven National Laboratory. This work covers a broad range of scientific disciplines. Major facilities include the Alternating Gradient Synchrotron (AGS), with its newly completed booster, the National Synchrotron Light Source (NSLS), the High Flux Beam Reactor (HFBR), and the RHIC, which is under construction. Departments within the laboratory include the AGS department, accelerator development, physics, chemistry, biology, NSLS, medical, nuclear energy, and interdepartmental research efforts. Research ranges from the pure sciences, in nuclear physics and high energy physics as one example, to environmental work in applied science to study climatic effects, from efforts in biology which are a component of the human genome project to the study, production, and characterization of new materials. The paper provides ...
This publication provides a broad overview of the research programs and efforts being conducted, built, designed, and planned at Brookhaven National Laboratory. This work covers a broad range of scientific disciplines. Major facilities include the Alternating Gradient Synchrotron (AGS), with its newly completed booster, the National Synchrotron Light Source (NSLS), the High Flux Beam Reactor (HFBR), and the RHIC, which is under construction. Departments within the laboratory include the AGS department, accelerator development, physics, chemistry, biology, NSLS, medical, nuclear energy, and interdepartmental research efforts. Research ranges from the pure sciences, in nuclear physics and high energy physics as one example, to environmental work in applied science to study climatic effects, from efforts in biology which are a component of the human genome project to the study, production, and characterization of new materials. The paper provides ...
This report describes a microcomputer-based, single-project financial analysis program: BREEDER. BREEDER is a user-friendly model designed to facilitate frequent and rapid analyses of the financial implications associated with alternative design and financing strategies for electric generating plants and large-scale prototype breeder (LSPB) reactors in particular. The model has proved to be a useful tool in establishing cost goals for LSPB reactors. The program is available on floppy disks for use on an IBM personal computer (or IBM look-a-like) running under PC-DOS or a Kaypro II transportable computer running under CP/M (and many other CP/M machines). The report documents version 1.5 of BREEDER and contains a user's guide. The report also includes a general overview of BREEDER, a summary of hardware requirements, a definition of all required program inputs, a description of all algorithms used in performing the construction-period ...
Within the Annual Conference 2009 of the VGB PowerTech e.V. (Essen, Federal Republic of Germany) from 23rd to 25th May, 2009, in Lyon (France) the following lectures were held: (1) Electricity demand, consequences of the financial and economic crisis - Current overview 2020 for the EU-27 (Hans ten Berge); (2) Status and perspectives of the electricity generation mix in France (Bernard Dupraz); (3) European electricity grid - status and perspective (Dominique Maillard); (4) Technologies and acceptance in the European energy market (Gordon MacKerran); (5) EPR construction in Finland, China, France, (Claude Jaouen); (6) EPR Flamanville 3: A project on the path towards nuclear revival (Jacques Alary); (7) Worldwide nuclear Revival and acceptance (Luc Geraets); (8) An overview on the status of final disposal of radioactive wastes worldwide (Piet Zuidema); (9) Who needs pumped storage plants? PSP are partner to grid stability and renewable energies ...
Within the Annual Conference 2009 of the VGB PowerTech e.V. (Essen, Federal Republic of Germany) from 23rd to 25th May, 2009, in Lyon (France) the following lectures were held: (1) Electricity demand, consequences of the financial and economic crisis - Current overview 2020 for the EU-27 (Hans ten Berge); (2) Status and perspectives of the electricity generation mix in France (Bernard Dupraz); (3) European electricity grid - status and perspective (Dominique Maillard); (4) Technologies and acceptance in the European energy market (Gordon MacKerran); (5) EPR construction in Finland, China, France, (Claude Jaouen); (6) EPR Flamanville 3: A project on the path towards nuclear revival (Jacques Alary); (7) Worldwide nuclear Revival and acceptance (Luc Geraets); (8) An overview on the status of final disposal of radioactive wastes worldwide (Piet Zuidema); (9) Who needs pumped storage plants? PSP are partner to grid stability and renewable energies ...
The inner part of a fusion reactor will have to operate at very high neutron loads. In steady-state reactors the minimum fluence before the scheduled replacement of the reactor core should be at least l0-15 Mw.yr/m2. A more frequent replacement of the core is hardly compatible with economic constraints. A most recent summary of the discussions of these issues is presented in Ref. [l]. If and when times come to build a commercial fusion reactor, the availability of information on the behavior of materials and components at such fluences will become mandatory for making a final decision. This makes it necessary an early development and construction of a neutron source for fusion material and component testing. In this paper, we present information on one very attractive concept of such a source: a source based on a so called Gas Dynamic Trap. This neutron source was proposed in the mid 1980s (Ref. [2]; see also a survey [3] with discussion of ...
Back in 1985 it was the European Commission's intention to demonstrate on rather large scale the provision of clean and renewable energy with hydrogen as energy vector and fuel. The cheapest and technologically available form of renewable electricity, the primary energy for electrolytic hydrogen, is hydropower. Most of the hydroenergy sources are oversea's. The World's topologically and technically exploitable hydroenergy potential is estimated to be in the order of 20.10{sup 3} TWh/y, i.e. 0.0057% of the hydraulic cycle energy. Today's hydroelectricity generation is {approx}2500 TWh/y i.e. {approx}21% of the World's electricity generation. Quebec's installed hydroelectricity is 33.5 GW, its residual potential is 50 GW or 190 TWh/y and 285 TWh/y, respectively (load factor 0.65). The construction of hydropower installation is rather clean. The construction of La Grande at James Bay with an ...
OAK B188 The goal of this project is to mimic the energy transduction processes by which photosynthetic organisms harvest sunlight and convert it to forms of energy that are more easily used and stored. The results may lead to new technologies for solar energy harvesting based on the natural photosynthetic process. They may also enrich our understanding and control of photosynthesis in living organisms, and lead to methods for increasing natural biomass production, carbon dioxide removal, and oxygen generation. In our work to date, we have learned how to make synthetic antenna and reaction center molecules that absorb light and undergo photoinduced electron transfer to generate long-lived, energetic charge-separated states. We have assembled a prototype system in which artificial reaction centers are inserted into liposomes (artificial cell-like constructs), where they carry out light-driven transmembrane translocation of hydrogen ions to ...
The Monsanto Chemical Company operates a plastics and resins plant located in Addyston, Ohio. The process equipment requires routine rinsing with technical grade acetone between batches. Due to the volumes of spent acetone generated and the associated RCRA hazardous waste regulations, the plant sought to recycle and reuse the acetone to reduce the purchase cost of virgin acetone and the cost of spent acetone disposal. One of the first options explored was package unit distillation units. The cost of these units was in the $20--$30,000 range in 1989 dollars. Even though the cost of a package unit was not deemed unreasonable, there were additional costs and concerns that led to elimination of this option. The unit would have required additional manpower to operate and maintain, i.e., at least a fraction of an operator and mechanic. For plant safety reasons, it was desired to operate this package unit outside the production building, thus construction of an ...
In coke-oven operations flue-gas valves are used to switch the regenerator function from rich gas firing to lean gas firing. Compared with the simple geometry of the other parts of the flow path, which comprise flues and regenerators, the narrow and winding passages of the flue-gas valves give rise to relatively high losses in pressure. Without the construction of high (and therefore expensive) chimneys, this means that operating problems may well arise due the inadequate suction capacity. The project focused on the theoretical and experimental analysis of a coke-oven flue-gas valve. The primary aim was to reduce the pressure drop through the valve without modifying its external geomerty. The internal flow characteristics created by different valve geometries under a variety of operating conditions were simulated using the commercial CFD code Fluent/UNS, which provided velocity and pressure distributions. A half-scale model valve was ...
Over the past 15 years, the People's Republic of China has experienced very rapid economic growth of annual average 8%, which must be supported by fast expanding energy production, notably of electricity. China has the considerable amount of coal resources, but most of these resources are located in the north of the country, and the vast hydroelectric potential in Southwestern China is difficult to develop. Therefore, in the coastal provinces of Southeast China, where economic expansion is greatest, nuclear power has been chosen to meet the need. The Qinshan No. 1 PWR with 300 MWe output is the first Chinese nuclear power facility, and started the operation in 1992. Two 985 MWe PWRs have been operated since 1994 at Daya Bay. The construction of Qinshan No. 2 and 3 PWRs of 600 MWe each are in progress, and are expected to start the operation in 2001. These plants were designed by China based on the Framatome technology. Two more 985 MWe plants will be ...
This project is aimed at development of optimum combustion technology with diversified fuels, e.g., naphtha and LCO, for gas turbines and others as power sources for topographical energy supply. The combustion under the microgravity is also investigated using the underground facilities at Japan Microgravity Center. Described herein are the FY 2000 results. For construction of combustion model and simulation, the combustion reactions for various liquid fuels are simplified to calculate ignition delay, adiabatic flame temperature and laminar burning velocity with an error less than about 3%. The microgravity combustion experiments are conducted for spray dispersed into a cylinder, to find flame propagation velocities changing with the vaporization characteristics of liquid fuels, and also to construct the combustion models. The premixed turbulent combustion simulation program is developed using a probability density function ...
Within the United Kingdom, the regulatory body having responsibility for the licensing of nuclear installations is the Health and Safety Executive (HSE). The Nuclear Installations Inspectorate (NII) is that part of HSE which administers this function. Discussions on the applicability of quality assurance (QA) to licensed sites began in 1974, and an internal report was published in 1975. In parallel with work going on at the International Atomic Energy Agency (IAEA) to prepare Quality Assurance for Safety in Nuclear Power Plants: A Code of Practice, Safety Series No. 50-C-QA, NII published a second report in 1978 entitled A Guide to the Quality Assurance Programme for Nuclear Power Plants. In 1980, the construction of advanced gas cooled reactors at Heysham 2 and at Torness was licensed, and a condition was attached to the licences requiring the licensees to submit their QA arrangements to the NII for approval. The licensees' response was to produce separate QA ...
The objective of the first project period is to: make a study into materials suitable for the non-premix radiant burners (NPRB); choose the materials for the construction; make proposals for the design of the NPRB; test the different proposals with a CFD-model. In pursuit of finding a suitable material it is necessary first to estimate the maximum temperature that will occur in the burner. It has been estimated that the maximum adiabatic flame temperature will be about 2400-2500 K. The maximum temperature in the burner will of course never reach this level. A more realistic temperature was estimated to 2100-2300 K. The final choice was made after having contacted some of the leading producers. It was possible to find one producer that could produce burners of one of the suggested materials, zirconia. Several construction ideas for the NPRB have been discussed and some of them tested with a CFD-model. The proposed burner ...
The scope of the project includes four activities such as construction of DB, development of data base management tool, development of severe accident analysis code system and FP studies. In the construction of DB, level-1,2 PSA results and plant damage states event trees were mainly used to select the following target initiators based on frequencies: LLOCA, MLOCA, SLOCA, station black out, LOOP, LOFW and SGTR. These scenarios occupy more than 95% of the total frequencies of the core damage sequences at KSNP. In the development of data base management tool, SARD 2.0 was developed under the PC microsoft windows environment using the visual basic 6.0 language. In the development of severe accident analysis code system, MIDAS 1.0 was developed with new features of FORTRAN-90 which makes it possible to allocate the storage dynamically and to use the user-defined data type, leading to an efficient memory treatment and an easy ...
In order to practice design-by-analysis of thermohydraulics design of BWR fuel rod bundles, the subchannel analysis would play a major role. There, one of the immediate concerns is improvement in its predictive capability of boiling transition phenomena on the fuel rod surface. This capability strongly depends on the modeling of thermohydraulics phenomena of interests: 1) vapor-liquid redistribution by inter-subchannel exchanges due to the diversion cross flow, turbulent mixing and void drift, 2) liquid film behaviors, 3) transition of two-phase flow regimes, 4) droplet entrainment and deposition and 5) spacer-droplet interactions. These are considered to be five key factors in understanding the BT in BWR fuel rod bundles. This paper describes a progress and current status in the second year of the three year project on developing generalized boiling transition models with the above five key factors being focused on. A combined approach of experiment and ...
Diseases of the mandible affect the soft tissues aside from the osseous manifestation. This can be shown clearly and in great detail by magnetic resonance imaging (MRI). MRI is the gold standard in the diagnostic evaluation of any internal derangement of the temporomandibular joint. Dental MRI requires high resolution techniques and in some cases also intravenous administration of contrast material. These techniques allow delineation of the neurovascular bundle. In the past few years new indications were formulated, for example, the evaluation of the integrity of the inferior alveolar nerve in trauma and in radicular cysts. New quantitative methods now enable insights into the pathophysiology. The objective of this review is to communicate accepted indications for MRI of the mandible and to present innovative applications. (orig.) [German] Mandibulaere Erkrankungen beteiligen neben dem Knochen Weichteilstrukturen, die sich mit der MRT klar und detailreich darstellen lassen. In der ...
The windmill industry in Denmark is currently confronted with making a choice between competing technologies so that the role of the stimulus of state subsidies for research has lately increased in importance. The Ministry of Energy, it is claimed, must be aware of this as possibilities for making use of research results are dictated by the market and competition. The industry is not sympathetic to the idea of state research contracts with specified goals for which manufacturers must produce a technical solution. Consultancy firms should work towards solving general problems which could help the industry as a whole. Wind turbines which are cheap to produce and operate are of more interest to industry than those which are technologically advanced or of a lighter construction. It is not thought to be advantageous to concentrate the allocation of subsidies on one key project chosen by the Ministry itself, such as the current intense interest in ...
The windmill industry in Denmark is currently confronted with making a choice between competing technologies so that the role of the stimulus of state subsidies for research has lately increased in importance. The Ministry of Energy, it is claimed, must be aware of this as possibilities for making use of research results are dictated by the market and competition. The industry is not sympathetic to the idea of state research contracts with specified goals for which manufacturers must produce a technical solution. Consultancy firms should work towards solving general problems which could help the industry as a whole. Wind turbines which are cheap to produce and operate are of more interest to industry than those which are technologically advanced or of a lighter construction. It is not thought to be advantageous to concentrate the allocation of subsidies on one key project chosen by the Ministry itself, such as the current intense interest in ...
The integrated-gasification combined-cycle (IGCC) process is an emerging technology that utilizes coal for power generation and production of chemical feedstocks. However, the process generates large amounts of solid waste, consisting of vitrified ash (slag) and some unconverted carbon. In previous projects, Praxis investigated the utilization of {open_quotes}as-generated{close_quotes} slags for a wide variety of applications in road construction, cement and concrete production, agricultural applications, and as a landfill material. From these studies, we found that it would be extremely difficult for {open_quotes}as-generated{close_quotes} slag to find large-scale acceptance in the marketplace even at no cost because the materials it could replace were abundantly available at very low cost. It was further determined that the unconverted carbon, or char, in the slag is detrimental to its utilization as sand or fine aggregate. It became apparent ...
The term Smith-Purcell free electron laser can be employed generally to describe any coherent radiation source in which a diffraction grating is used to couple an electron beam with the electromagnetic field. To date, most practical developments of this concept have focused on devices which operate in the millimeter spectral regime. In this paper construction of a Smith-Purcell free-electron laser operating in the far-infrared (FIR) region using a novel resonator cavity design and the electron beam from a low energy (0.5-5 MeV) radio-frequency accelerator will be discussed. A tunable source in this region would have many applications and since the beam energy is low, the small size and low overall cost of such a device would make it a laboratory instrument. Current projects which are progressing towards developing a FIR source are the programs at Stanford and CREOL. Both of these projects are using permanent magnet ...
The purpose of the New Mexico Environmental Evaluation Group (EEG) is to conduct an independent technical evaluation of the Waste Isolation Pilot Plant (WIPP) Project to ensure the protection of the public health and safety and the environment. The WIPP Project, located in southeastern New Mexico, is being constructed as a repository for the disposal of transuranic (TRU) radioactive wastes generated by the national defense programs. The EEG was established in 1978 with funds provided by the U.S. Department of Energy (DOE) to the State of New Mexico. Public Law 100-456, the National Defense Authorization Act, Fiscal Year 1989, Section 1433, assigned EEG to the New Mexico Institute of Mining and Technology and continued the original contract DE-AC04-79AL10752 through DOE contract DE-AC04-89AL58309. The National Defense Authorization Act for Fiscal Year 1994, Public Law 103-160, continues the authorization. EEG performs ...
Quality Assurance (QA) has not been taken very seriously in developing countries despite their having significant nuclear power programmes. This may affect plant reliability and demands that urgent and serious attention be given to the development and implementation of Quality Assurance programmes according to local conditions. Confusion has been created by the differences in definitions and interpretations of terminologies of Quality Assurance and Control. Problems have been aggravated by the lack of clearly defined responsibilities and accountabilities during the projects execution phases of site selection, data collection, design, equipment fabrication and construction, etc. Therefore, reliability of nuclear power plants in developing countries is relatively low. But whenever some programme of QA has been implemented it has helped to improve the plant performance. This is highlighted in this paper by the practical examples for the experience ...
SX Holdings Limited intends to establish a rare earths plant at Port Pirie, South Australia. The proposal involves three stages of development, Stage 3 being to develop a monazite cracking plant and associated rare earths separation facility with the capacity to process up to 8,000 t/a of monazite-type ores. The proposed initial capacity is 4,000 t/a. This Draft Environmental Impact Statement relates to Stage 3 and is based on a monazite processing capacity of 8,000 t/a. The justification of the project is given in terms of use and the market for rare earths, the economic and environmental benefits of the proposal, the site selection process, site rehabilitation, and the consequences of not proceeding. A detailed description of the project is given, including the treatment process, site development and facilities, the supply of raw materials, product and waste handling, transport and storage, plant commissioning, operation and decommissioning, ...
As part of The International Northern Sea Route Programme (INSROP), Subprogram III, Trade and Commercial Shipping, a study has been made concerning seaborne export of liquefied petroleum gas (LPG) from the Northern Russia, especially the West Siberian fields in Tyumen. The main purpose of the total project III.0703, part 2 and this study is to evaluate the economic viability of seaborne export from this area to the European region, mainly with the use of a special ice-strengthened LPG vessel, constructed and designed for such seaborne operations. This study concentrates on both seaborne LPG transportation, the demand and supply for seaborne LPG in the world and marine transportation of LPG from the West Siberian fields. Another purpose is to see which regions are potential exporters, importers and buyers of seaborne export of LPG from Tyumen. Currently large quantities of liquefied gas are flared off at the West Siberian fields due to ...
In FY-2000, Engineering at Lawrence Livermore National Laboratory faced significant pressures to meet critical project milestones, and immediate demands to facilitate the reassignment of employees as the National Ignition Facility (the 600-TW laser facility being designed and built at Livermore, and one of the largest R&D constructionprojects in the world) was in the process of re-baselining its plan while executing full-speed its technology development efforts. This drive for change occurred as an unprecedented level of management and program changes were occurring within LLNL. I am pleased to report that we met many key milestones and achieved numerous technological breakthroughs. This report summarizes our efforts to perform feasibility and reduce-to-practice studies, demonstrations, and/or techniques--as structured through our technology centers. Whether using computational engineering to predict how giant ...
In light of the recent rapid increase in the fossil fuel prices it is meaningful to evaluate the impact of these price changes in the economics of dual-purpose desalination projects producing electricity and fresh water simultaneously. The price of crude oil and LNG (Liquefied Natural Gas) has increased by about 200% and 100% during the past three or four years. The uranium price has also increased by nearly 500% during the same period. The purpose of this paper is to analyze and compare the economics of SMART (System-integrated Modular Advanced ReacTor) which is being developed as a small size PWR type and the LNG Combine Cycle coupled with MED (Multi-Effect Distillation) which are being acknowledged as promising energy sources for the future in Korea. The methods of analysis used in this paper are the lifetime leveled cost method for the power and water cost calculation and the power credit method for the total cost allocation. DEEP (Devaluation Economic ...
In light of the recent rapid increase in the fossil fuel prices it is meaningful to evaluate the impact of these price changes in the economics of dual-purpose desalination projects producing electricity and fresh water simultaneously. The price of crude oil and LNG (Liquefied Natural Gas) has increased by about 200% and 100% during the past three or four years. The uranium price has also increased by nearly 500% during the same period. The purpose of this paper is to analyze and compare the economics of SMART (System-integrated Modular Advanced ReacTor) which is being developed as a small size PWR type and the LNG Combine Cycle coupled with MED (Multi-Effect Distillation) which are being acknowledged as promising energy sources for the future in Korea. The methods of analysis used in this paper are the lifetime leveled cost method for the power and water cost calculation and the power credit method for the total cost allocation. DEEP (Devaluation Economic ...
This Dissertation presents the author's investigation and development of a systematic method for evaluating the aerodynamic performance of Vertical Axis Wind Energy Capture Systems (WECS) apart from their electrical generation capability. The current standard method for specifying a wind energy machine is to discuss its rated power in kilowatts (or megawatts when capacity exceeds 100 kW). While this holistic method is effective for comparing machines it does not reveal the essential characteristics necessary for optimization of individual machine components. The method developed herein separates the performance characteristics of the WECS from the generation characteristics and isolates them for benchmarking and optimization. In order to develop an evaluation criterion, it was essential to evaluate and benchmark the current state of the art for wind energy capture. A thorough history of Vertical Axis Wind Turbine (VAWT) development and technology transfer, a standardized set of VAWT ...
The objectives of this project are to support the DOE direct coal liquefaction process development program and to improve the useful application of analytical chemistry to direct coal liquefaction process development. Independent analyses by well-established methods will be obtained of samples produced in direct coal liquefaction processes under evaluation by DOE. Additionally, analytical instruments and techniques which are currently underutilized for the purpose of examining coal-derived samples will be evaluated. The data obtained from this study will be used to help guide current process development and to develop an improved data base on coal and coal liquids properties. A sample bank will be established and maintained for use in this project and will be available for use by other researchers. The reactivity of the non-distillable resids toward hydrocracking at liquefaction conditions (i.e., resid reactivity) will be examined. From the ...
This project is a follow-up of the first development of a 500 kV HVDC airblast circuit breaker (EPRI project 1507-3). The objective was to increase the current interrupting capability from 2200 A to 4000 A and shorten its fault clearing time. A high current 500 kV HVDC circuit breaker has been built using the passive commutation circuit. The breaker is modular in construction and can be designed for a wide variety of system conditions. More than 400 current interruptions were carried out successfully. Tests have shown that this circuit breaker is capable of interrupting more than 4000 A dc. Practical breakers with current interrupting capability of even 5500 A dc could be built. The circuit breaker operation and the fault-clearing process can be materially speeded up if the trip signal is given as soon as the fault is detected and without waiting for the current levels to come down in response to converter control action. ...
One of the aims in the safety assessment of SFR-1 is to estimate the release to the environment. In order to make these calculations there is a need to describe the inventory in greater detail. The new computerised database of waste in SFR-1 gives a good possibility to achieve this. The aim for project SAFE is to make both conservative and realistic radionuclide transport calculations. To achieve this goal there must be two inventories. The conservative inventory is the inventory used in the design of the repository, which in most parts is identical with the limits in the licence for SFR-1. There is a great interest to have good estimates of the volumes of the different waste types. A thorough prognosis should be made in 1999, but until then the latest one from 1995 could be used in the calculations. The total (actual) inventory of nuclides is calculated from the measurements of the easy-to-measure nuclides since, in principle, all hard-to-measure nuclides are ...
Located approximately 350 km east of Newfoundland, on the eastern edge of the Jeanne d'Arc Basin, and approximately 50 km from both the Terra Nova and Hibernia oilfields, the White Rose oilfield is considered the main oil producing basin off the eastern coast of North America. Husky Oil is very active in the region and holds almost 32 per cent net working interest in the Significant Discovery License areas in the Jeanne d'Arc basin. The development of an economically significant oil discovery in the White Rose Significant Discovery Area is being proposed jointly by Husky Oil and Petro-Canada. It is estimated that the project would enable the recovery of an estimated 36 million cubic meters (230 million barrels) of recoverable oil in this area that covers approximately 40 square kilometers. The operators propose to use a ship-shaped floating production, storage and offloading (FPSO) facility which could store up to 135,000 cubic meters (850,000 ...
The state of exploration in the Terra Nova field offshore Newfoundland, and the progress in constructing the floating production, storage and offloading (FPSO) at Bull Arm, the assembly site west of St. John's for the Terra Nova vessel, are described. Comparisons are made between the excitement created by the first production well at Leduc in Western Canada in 1947, and the offshore developments currently underway and accelerating offshore Newfoundland. It is estimated that exploration and development offshore had barely touched the surface, with only 160 wells of all types drilled to date, of which 48 exploration wells have uncovered 1.7 billion barrels of oil. The area is practically unexplored; the source rock is there, and the current estimate is that there are a number of basins in the offshore area that are several times the size of the Jeanne d'Arc Basin, where the Hibernia field is currently producing about 135,000 barrels of oil per day. ...
Nickel base superalloys for turbine construction are exposed to maximum thermal and mechanical stresses. owing to a change of materials by one of the project partners, the project only comprised analyses of the alloy CMSX-6. Isothermal tensile and fatigue tests provided basic data on the alloy. Thermomechanical fatigue tests showed that material life and microstructural changes are clearly, and to an extreme extent, dependent on the type of combination of the two stress factors `temperature interval` and `total strain amplitude`, while the damage to the material tends to be a function of the maximum stresses for a given stress path. On the one hand, these results make it possible to obtain information real stresses from the structures of real blades. On the other hand, constructional measures can be taken in order to better adapt the stresses to which alloys are exposed to their characteristic ...
This report summarizes work performed on this project from October 2004 through March 2005. In previous work, a surfactant modified zeolite (SMZ) was shown to be an effective system for removing BTEX contaminants from produced water. Additional work on this project demonstrated that a compost-based biofilter could biodegrade the BTEX contaminants found in the SMZ regeneration waste gas stream. However, it was also determined that the BTEX concentrations in the waste gas stream varied significantly during the regeneration period and the initial BTEX concentrations were too high for the biofilter to handle effectively. A series of experiments were conducted to determine the feasibility of using a passive adsorption column placed upstream of the biofilter to attenuate the peak gas-phase VOC concentrations delivered to the biofilter during the SMZ regeneration process. In preparation for the field test of the SMZ/VPB treatment system in New Mexico, ...
OBJECTIVE: To use Medicaid claims data to construct patient origin-based market areas for dental services and compare constructed market areas with those based on the practice county. DATA SOURCES:...Full Text Available
Describes the light construction curriculum offered at Carteret Technical College, NC, in terms of course offerings, program finances, problems, and the establishment of tax-exempt endowment corporation through which the program was funded. Concludes with suggestions for organizing a construction program. (AYC)
Nuclear power plants of 20 units of in Korea are generating about 700 MTU of spent fuels annually. The inventory of spent fuels in Korea were estimated about 10,087.07 MTU at end of 2008, and the storage space of spent fuels won't be available any more at 2016 due to the saturation of the spent fuel pools in the plants. In addition, in order to reduce carbon emission and correspond to the enormous electricity demand in Korea, 8 units of nuclear power plants are under construction and several more plants are under planning. The 100,000 MTU of spent fuel inventory are expected by the year of 2095 in Korea. Therefore, short term and long term of spent fuel management plans are under discussion and implementation in Korea. As a short term of spent fuel management strategy for the target year of 2016, central or local spent fuel dry interim storage options are mostly under discussion. As a long term of management plan, fast reactor and advanced fuel cycle R and D plan ...
The purpose of this document is to describe the NIF Project Organization and the roles and responsibilities of the managers charged with executing the Project.
In this paper information about monograph construction is provided and some sample nomographs constructed by the author are included to encourage the use of these tools in operational health physics applications.
... revetment construction, water well drilling, mobile facility assets construction using ... five days, and establish site layout for the follow-on RH ... modules. ...
discharges. Proposed Stormwater ELG from Construction Sites - EPA has proposed effluent limitations guidelines (ELGs) and new source performance standards (NSPS) to control...
Hydrothermal oxidation (HTO) is a promising technology for the treatment of aqueous-fluid hazardous and mixed waste streams. Waste streams identified as likely candidates for treatment by this technology are primarily aqueous fluids containing hazardous organic compounds, and often containing inorganic compounds including radioisotopes (mixed wastes). These wastes are difficult and expensive to treat by conventional technologies (e.g. incineration) due to their high water content; in addition, incineration can lead to concerns related to stack releases. An especially attractive potential advantage of HTO over conventional treatment methods is the total containment of all reaction products within the overall system. The potential application of hydrothermal oxidation (HTO) technology for the treatment of DOE hazardous or mixed wastes has been uncertain due to concerns about safe and efficient operation of the technology. In principle, aqueous DOE wastes, including hazardous an d mixed ...
The need for a Combustion and Melting Research Facility focused on the solution of glass manufacturing problems common to all segments of the glass industry was given high priority in the earliest version of the Glass Industry Technology Roadmap (Eisenhauer et al., 1997). Visteon Glass Systems and, later, PPG Industries proposed to meet this requirement, in partnership with the DOE/OIT Glass Program and Sandia National Laboratories, by designing and building a research furnace equipped with state-of-the-art diagnostics in the DOE Combustion Research Facility located at the Sandia site in Livermore, CA. Input on the configuration and objectives of the facility was sought from the entire industry by a variety of routes: (1) through a survey distributed to industry leaders by GMIC, (2) by conducting an open workshop following the OIT Glass Industry Project Review in September 1999, (3) from discussions with numerous glass engineers, scientists, and executives, and (4) ...
... harassment, incidental to construction and operation of an offshore liquefied natural gas (LNG) facility. Under the Marine Mammal Protection ... ...
The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.
The objective of this manuscript is to fully derive a geophysical multiphase model able to ''accommodate'' different multiphase turbulence approaches; viz., the Reynolds Averaged Navier-Stokes (RANS), the Large Eddy Simulation (LES), or hybrid RANSLES. This manuscript is the first part of a larger geophysical multiphase project--lead by LANL--that aims to develop comprehensive modeling tools for large-scale, atmospheric, transient-buoyancy dusty jets and plume (e.g., plinian clouds, nuclear ''mushrooms'', ''supercell'' forest fire plumes) and for boundary-dominated geophysical multiphase gravity currents (e.g., dusty surges, diluted pyroclastic flows, dusty gravity currents in street canyons). LES is a partially deterministic approach constructed on either a spatial- or a temporal-separation between the large and small scales of the flow, ...
The contribution examines whether the construction of high-voltage transmission lines without formal participation of local authorities is permissible. In this connection the question is also treated to what extent municipal co-determination in transmission line construction represents a precondition for the permissibility of compulsory purchase measures. The individual issues treated are: the formal legal situation and current practice in the construction of electricity pylons; individual legal protection in connection with compulsory purchase; the construction of pylons without a construction licence as an infringement of the municipal right to self-government of local authorities; and the effects on the execution of compulsory purchase procedures of the illegality under Building Law of pylons constructed without approval. (RST).
In order to practice a design-by-analysis of thermohydraulics design of BWR fuel rod bundles, the subchannel analysis would play a major role. There, the immediate concern is improvement in its predictive capability of CHF due in particular to the film dryout (boiling transition phenomena: BT) on the fuel rod surface. Constitutive equations in the subchannel analysis formulation are responsible for the quality of calculated results. The constitutive equations are a result of integration of the local and instantaneous description of two-phase flows over the subchannel control volume. In general, they are expressed in terms of subchannel-control-volume- as well as area-averaged two-phase flow state variables. In principle the information on local and instantaneous physical phenomena taking place inside subchannels must be counted for in the algebraic form of the equations on the basis of a more mechanistic modeling approach. They should include also influences of the multi-dimensional ...
Full text of publication follows:In order to practice a design-by-analysis of thermohydraulics design of BWR fuel rod bundles, the subchannel analysis would play a major role. There, the immediate concern is improvement in its predictive capability of CHF due in particular to the film dryout (boiling transition phenomena: BT) on the fuel rod surface. Constitutive equations in the subchannel analysis formulation are responsible for the quality of calculated results. The constitutive equations are a result of integration of the local and instantaneous description of two-phase flows over the subchannel control volume. In general, they are expressed in terms of subchannel-control-volume- as well as area-averaged two-phase flow state variables. In principle the information on local and instantaneous physical phenomena taking place inside subchannels must be counted for in the algebraic form of the equations on the basis of a more mechanistic modeling approach. They should include also ...
In order to practice a design-by-analysis of thermohydraulics design of BWR fuel rod bundles, the subchannel analysis would play a major role. There, the immediate concern is improvement in its predictive capability of CHF due in particular to the film dryout (boiling transition phenomena: BT) on the fuel rod surface. Constitutive equations in the subchannel analysis formulation are responsible for the quality of calculated results. The constitutive equations are a result of integration of the local and instantaneous description of two-phase flows over the subchannel control volume. In general, they are expressed in terms of subchannel-control-volume- as well as area-averaged two-phase flow state variables. In principle the information on local and instantaneous physical phenomena taking place inside subchannels must be counted for in the algebraic form of the equations on the basis of a more mechanistic modeling approach. They should include also influences of the multi-dimensional ...
By August 2007, there were 438 nuclear power plants (NPPs) in operation worldwide, with a total capacity of 371.7 GW(e). Further, 31 units, totaling 24.1 GW(e), were under construction. During 2006 nuclear power produced 2659.7 billion kWh of electricity, which was 15.2% of the world's total. The vast majority of these plants use water-cooled reactors. Based on information provided by its Member States, the IAEA projects that nuclear power will grow significantly, producing between 2760 and 2810 billion kWh annually by 2010, between 3120 and 3840 billion kWh annually by 2020, and between 3325 and 5040 billion kWh annually by 2030. There are several reasons for these rising expectations for nuclear power: - Nuclear power's lengthening experience and good performance: The industry now has more than 12 000 reactor years of experience, and the global average nuclear plant availability during 2006 reached 83%; - Growing energy needs: All forecasts ...
By August 2007, there were 438 nuclear power plants (NPPs) in operation worldwide, with a total capacity of 371.7 GW(e). Further, 31 units, totaling 24.1 GW(e), were under construction. During 2006 nuclear power produced 2659.7 billion kWh of electricity, which was 15.2% of the world's total. The vast majority of these plants use water-cooled reactors. Based on information provided by its Member States, the IAEA projects that nuclear power will grow significantly, producing between 2760 and 2810 billion kWh annually by 2010, between 3120 and 3840 billion kWh annually by 2020, and between 3325 and 5040 billion kWh annually by 2030. There are several reasons for these rising expectations for nuclear power: - Nuclear power's lengthening experience and good performance: The industry now has more than 12 000 reactor years of experience, and the global average nuclear plant availability during 2006 reached 83%; - Growing energy needs: All forecasts ...
By August 2007, there were 438 nuclear power plants (NPPs) in operation worldwide, with a total capacity of 371.7 GW(e). Further, 31 units, totaling 24.1 GW(e), were under construction. During 2006 nuclear power produced 2659.7 billion kWh of electricity, which was 15.2% of the world's total. The vast majority of these plants use water-cooled reactors. Based on information provided by its Member States, the IAEA projects that nuclear power will grow significantly, producing between 2760 and 2810 billion kWh annually by 2010, between 3120 and 3840 billion kWh annually by 2020, and between 3325 and 5040 billion kWh annually by 2030. There are several reasons for these rising expectations for nuclear power: - Nuclear power's lengthening experience and good performance: The industry now has more than 12 000 reactor years of experience, and the global average nuclear plant availability during 2006 reached 83%; - Growing energy needs: All forecasts ...
This paper deals with the externally coal-fired combined cycle (EFCC). A process simulation for different configurations of the EFCC-process is carried out as well as an investigation of the effect of the key parameters such as the gas turbine inlet temperature and the compressor intake airflow. The results show a promising potential of the efficiency. One component of this combined gas and steam turbine cycle is a high temperature heat exchanger that has to withstand the extrem chemical and thermal operating conditions. Fibre reinforced ceramics and combinations of them with monolithic ceramics seem to be the most promising materials for this application. A cost estimating of the EFCC-process shows that a competitive operation should be possible. (orig.) [Deutsch] Die Ergebnisse der Prozesssimulationen weisen ein vielversprechendes Wirkungsgradpotential des extern kohlebefeuerten Gasturbinenprozesses auf. Der fuer dieses neue Kraftwerkskonzept notwendige ...
The BMW four-cylinder two-valve engine was first launched in September 1987 as a 1.8 l engine and was described in detail in [1]. After initial optimisation for model year 94, four years later the engine has undergone a complete technical revision. From model year 98, the four-cylinder two-valve engine with appropriate exhaust emission technology will satisfy the EU3 class for exhaust emissions. (orig.) [Deutsch] Der BMW Vierzylinder-Zweiventilmotor wurde im September 1987 als 1,8-l-Motor erstmals vorgestellt und in [1] ausfuehrlich beschrieben. Nach einer ersten Optimierungsueberarbeitung zum Modelljahr 1994 wurde nun eine grundlegende technische Ueberarbeitung vorgenommen. Der Vierzylindermotor mit Zweiventiltechnik erfuellt als Antriebsaggregat in Verbindung mit einer entsprechenden Abgastechnik bereits ab Modelljahr 1998 die EU 3-Stufe fuer Abgasemissionen. (orig.)
Magnetic fields can be compensated by opposing fields. This principle can be applied for reducing the magnetic fields emanating from high-voltage transmission lines or found in residential or commercial buildings. The article shows a number of concrete options for reducing magnetic fields in the vicinity of high-voltage lines through appropriate conductor configuration on the one hand, and a novel method using Helmholtz coils for compensating those fields in buildings. (orig.) [Deutsch] Magnetische Felder koennen durch Gegenfelder kompensiert werden. Dieses Prinzip laesst sich sowohl auf Hochspannungsleitungen als auch auf Wohn- und Arbeitsraeume uebertragen. Der Artikel zeigt konkrete Moeglichkeiten, wie einerseits Magnetfelder von Hochspannungsleitungen durch eine geeignete Konfiguration der Leiter reduziert werden koennen, und beschreibt andererseits eine neue Methode zur Reduktion solcher Felder in Wohn- und Arbeitsraeumen mittels Helmholtz-Spulen. (orig.)
Plasma Immersion Ion Implantation (PIII) is a new hybrid technology for surface treatment of materials based on the principles of plasma nitriding and ion implantation. The equipment and the operation of the system are introduced. As well as providing an alternate method of ion implantation, it is possible to combine energetic ion bombardment with plasma nitriding. Different metal materials and treatment conditions have been studied. The capability of PIII-treatment to improve the properties of a wide range of metals has been proven. Application for forming tools and their industrial test has been successful. (orig.) [Deutsch] Die Plasmaimmersionsimplantation (PIII) ist eine neue Hybridtechnologie zur Behandlung von Werkstoffoberflaechen und basiert auf den Prinzipien des Plasmanitrierens und der Ionenimplantation. Die Anlagentechnik und die Arbeitsweise werden vorgestellt. Verfahrensspezifische Vorteile entstehen durch die Moeglichkeit, sowohl alternative ...
Infrainguinal peripheral occlusive disease is increasingly being treated by endovascular techniques. Bare metal stainless steel, self-expanding nitinol stents, drug-eluting and covered stents (stent grafts) are becoming increasingly more important adjuncts to percutaneous translumninal angioplasty in the treatment of peripheral artery disease. In this article the available evidence supporting the use of stents in the femoropopliteal and tibial arteries will be described as well as their limitations. Future stent developments will also be discussed. (orig.) [German] Die endovaskulaere Therapie spielt bei der Therapie der peripheren arteriellen Verschlusskrankheit (PAVK) eine wichtige Rolle. Unbeschichtete ballonexpandierbare Stahlstents, selbstexpandierende Nitinolstents sowie medikamentenbeschichtete und ''covered stents'' (Stentgrafts) haben eine zunehmende Bedeutung als Zusatztherapie zusammen mit der primaeren Ballonangioplastie gewonnen. In ...
The liberalisation of the energy markets requires completely new demands to the information processing procedure of energy supply enterprises. These requirements are to be understood as chances for strengthening of the terms of competition. In the following contribution to this subject the actual status of the concept as converted by the Electricity Supply Company of Halle (Saale) including their departments of district heating, gas and electricity supply will be presented. This concept are comprising all experiences as gathered so far as well as intended further actions to be executed. (orig.) [German] Die Liberalisierung der Energiemaerkte stellt fuer Versorgungsunternehmen voellig neue Anforderungen an die Informationsverarbeitung. Diese Anforderungen sind als Chancen zur Staerkung der Wettbewerbsfaehigkeit zu verstehen. Die Verfasser erlaeutern den aktuellen Stand des in der EVH GmbH Halle (Saale) im Querverbund der Sparten Fernwaerme, Gas und Elektrizitaet ...
The new multi-purpose oxygen cupola furnace is a coke-fired shaft furnace that is operated on pure oxygen. The top gas is recirculated, and the fumes are drawn off at temperatures ranging from 800 to 1 000 C. The furnace offers the possibility of melting down contaminated and zinc-bearing scrap without the occurrence of any environment-polluting gas emissions. The absence of nitrogen ballast permits a high energy efficiency. (orig.) [Deutsch] Der neue Mehrzweck-Sauerstoff-Kupolofen ist ein koksbeheizter Schachtofen, der mit reinem Sauerstoff betrieben wird. Das Gichtgas wird im Kreislauf gefuehrt, und das Abgas wird aus einem Bereich mit Temperaturen von 800 bis 1 000 C abgefuehrt. Der Ofen bietet die Moeglichkeit, verunreinigte und zinkhaltige Schrotte einzuschmelzen, ohne dass umweltbelastende Gasemissionen auftreten. Der fehlende Stickstoffbalast bewirkt einen hohen energetischen Wirkungsgrad. (orig.)
Zusammenfassung Im Jahre 1910 f?hrte der schwedische Internist Hans-Christian Jacobaeus den ersten laparoskopischen Eingriff am Menschen in Stockholm durch. Grundlage seiner Pioniertat waren die tierexperimentellen Studien von Georg Kelling (1866?1945) aus Dresden, der im Jahre 1901 die erste Laparoskopie mittels eines Nitze-Zystoskops am Hund durchf?hrte. Jacobaeus ver?ffentlichte 1910 in der M?nchener Medizinischen Wochenschrift seine Erfahrungen mit den ersten 17 Laparoskopien unter dem Titel: ??ber die M?glichkeit die Zystoskopie bei Untersuchungen ser?ser H?hlen anzuwenden?. Hierbei nutzte er die neue Technik insbesondere zu diagnostischen Zwecken bei unklaren abdominellen Beschwerden und Funktionsst?rungen. Er war auch der Erste, der explizit auf die Gefahr der Darmverletzung bei Er?...
A new material has been developed for welded low-pressure shafts in steam turbines. Nine test welds were examined in order to confirm the chemical analysis. A shaft disc with an optimized composition was produced and destructively tested. The new material demonstrates, both in a total forging and also in a joint weld examined, excellent strength and toughness characteristics as well as excellent resistance to corrosion. Accordingly, all the requirements for welded low-pressure shafts in steam turbines are fulfilled. (orig.) [Deutsch] Fuer geschweisste Niederdruckwellen in Dampfturbinen wurde ein neuer Werkstoff entwickelt. Zur Festlegung der chemischen Analyse wurden 9 Versuchsschmelzen untersucht. Mit optimierter Zusammensetzung wurde eine Wellenscheibe hergestellt und zerstoerend untersucht. Der neue Werkstoff zeigt sowohl im gesamten Schmiedestueck als auch in einer untersuchten Verbindungsschweissung gute Festigkeits- und Zaehigkeitseigenschaften sowie gute ...
Purpose - This paper seeks to analyse the hypothesis that sustainability is destined to become the operating paradigm for construction education in the UK. Design/methodology/approach - An international literature review is used to assess the relationship between sustainability and the built environment. The viewpoints of the construction-related professions are examined by analysing the accreditation policies of key professional bodies and through a survey of public sector-based UK building professionals. International and national policy initiatives on educating for sustainability are reviewed and a survey of UK universities delivering construction degrees is used to explore the environmental content of construction courses. A brief case study describes recent efforts to systematically e...
The ECOTEC is a mass-efficient gasoline DOHC 4-valve per cylinder engine with balance shafts, chain driven camshafts and roller finger followers with hydraulic lash adjusters for valve actuation. It has lightweight aluminium components such as camcover, cylinder head, cylinder block, lower crankcase and structural oil pan. Other features include composite intake manifold and a coil-on-plug ignition cassette. The ECOTEC combustion system and engine architecture are optimized for low engine out and tail pipe emissions. It also includes several designed-in 'green' features for environmental benefits. The product design, development and validation process drew upon the best knowledge and practices available worldwide both inside and outside General Motor. The manufacturing systems were also designed by leveraging the best available knowledge around the world resulting in implementation of world class processes and error proofing to achieve the competitive edge in product ...
As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was ...
Project W-320 Acceptance Test Report for tank 241-C-106, 296-C-006 Ventilation System Acceptance Test Procedure (ATP) HNF-SD-W320-012, C-106 Tank Process Ventilation Test, was an in depth test of the 296-C-006 ventilation system and ventilation support systems required to perform the sluicing of tank C-106. Systems involved included electrical, instrumentation, chiller and HVAC. Tests began at component level, moved to loop level, up to system level and finally to an integrated systems level test. One criteria was to perform the test with the least amount of risk from a radioactive contamination potential stand point. To accomplish this a temporary configuration was designed that would simulate operation of the systems, without being connected directly to the waste tank air space. This was done by blanking off ducting to the tank and connecting temporary ducting and an inlet air filter and housing to the recirculation system. This configuration would eventually ...
This document presents our proposal to continue the activities of Boston University researchers in eight projects in high energy physics research: Colliding Beams Physics; Accelerator Design Physics; MACRO Project; Proton Decay Project; Theoretical Particle Physics; Muon G-2 Project; and Hadron Collider Physics. The scope of each of these projects is presented in detail in this paper.
The Atlantic Wind Test Site was established in 1980 as a laboratory to facilitate the evaluation and demonstration of wind energy systems and equipment. This annual report describes its organization and management, facilities, major projects, and the outlook for the future. Major projects include wind diesel; AWTS-IREQ collaboration; remote community data acquisition; lagerwey test program; Alaska Energy Authority Project; public education; Atlantic Orient Corporation 15/50 Project; and the soft VAWT project.
This presentation summarizes the present upgrade R&D projects in the TileCal collaboration. One project studies the possibility to divide the drawers into smaller minidrawers to simplify maintenance. There are three different front-end projects. There are also projects dealing with high voltage and low voltage distribution, projects for developing PMT dividers, low voltage electronics, data transmission and off-detector electronics.
International Thermonuclear Experimental Reactor (ITER) project is the international collaboration one for the commercialization of nuclear fusion energy through the technical and engineering verification. In ITER project, we plan to procure the blanket systems which has the risk of technology and cost when it is newly developed. We are developing the manufacturing process and joining technology for the ITER blanket to complete the procurement with qualified blanket system. To evaluate the soundness of manufacturing process, specimen and mock-up tests are being prepared. Finally, we can obtain the key technology of nuclear fusion reactor especially on the blanket design, joining and manufacturing technology through the present project and these technologies will help the construction of Korea fusion DEMO reactor and the development of commercial nuclear fusion reactor in Korea. In 1st year, through the ...
The following paragraphs summarize the progress of each research project funded under the WVU Cooperative Agreement during the third quarter of 1997 (July - September 1997). The projects are arranged according to their 1997 WVU task number. WVU Focus Area 1.0: Subsurface Contaminants, Containment and Remediation Task No. 1.1: Project discontinued. Task No. 1.2: Development of Standard Test Protocols and Barrier Design Models for Desiccation Barriers (K. Amininan & S. Ameri): A number of experiments were preformed this period to evaluate the ability of the dried sand-packs to act as a barrier to liquids. Water infiltration tests were done with a constant head, dispersing 80 ml of water, and by adding water in small increments. Results indicate that when the water is spilled over the sand-pack, it has the tendency to channel through the sand-pack, significantly reducing the capacity of the dried zone to retain liquid ...
This is the quarterly progress review report for Wolsung NPP 2, 3, 4 NSSS design and engineering which evaluates the performance of project and describes the project highlight, manpower loading status, design and engineering and project related meeting by...
The status of the South American Geocentric reference System (SIRGAS) Project is presented, including the project goals, objectives and tasks already carried out by the Working Groups. (author). 2 refs., 1 fig., 1 tab
...and biological processes acting on recruitment and post-recruitment EU-Agrinet - Project sheet: Biological performance testing methodology to evaluate the durability of plywood as a quality indicator ... Project sheet: Biological performance testing methodology to evaluate the durability of plywood as a quali EU-Agrinet - Project sheet: Genetic evaluation of European ...
The NASA/DoD Aerospace Knowledge Diffusion Research Project is a cooperative effort sponsored by NASA, Office of Aeronautics, Exploration and Technology (OAET), and DoD, SAF/AQT Deputy for Scientific and Technical Information. The research project is a jo...
The Sunshine Project of Japan was inaugurated in 1974. Since 1980 it has been promoting priority projects such as coal liquefaction. Japan is now promoting the basic and applied research that underpins this development and is increasing the efficiency of technical development. With regard to risk dispersion, the expansion of international cooperation such as the IEA is being promoted.
From 1991 to 1996, key studies on the reutilization, treatment, and disposal technology of hazardous wastes have been incorporated into the national plan for environmental protection science and technology. At present, the research achievements have been accomplished, have passed national approval, and have been accepted. The author of this paper, as leader of the national group for this research work, expounds the newest achievements of the studies involving four parts: (1) the reutilization technology of electroplating sludge, including the ion-exchange process for recovering the sludge and waste liquor for producing chromium tanning agent and extracting chromium and colloidal protein from tanning waste residue; on the recovery of heavy metals from the electroplating waste liquor with microbic purification; on the demonstration project of producing modified plastics from the sludge and the waste plastics; and on the demonstration of the recovery of heavy metals ...
The Large Hadron Collider (LHC), under construction at CERN, uses superconducting magnets operating at a temperature of 1.9 K to guide the circulating particles. A specific feature of the main magnets (dipoles and quadrupoles) is the two-in-one design with two magnetic channels in one common retaining structure. Indeed, the accelerator is made of two rings, mechanically linked, that have to be simultaneously aligned during the installation in the already existing LEP tunnel. The assembly tolerances of the LHC main magnets have been reconsidered to take into account the tight constraints on geometry. The dipoles are bent to follow closely the curvature of the circulating particles and to make a larger mechanical aperture available for the circulating particles. In order to minimise the geometrical errors the dipole assembly procedure is assisted by high precision survey measurements based on laser trackers. By this we hope to reduce to {+-} 1 mm the positioning ...
The Army Reactor Area (ARA) II was constructed in the late 1950s as a test site for the Stationary Low Power Reactor No. 1 (SL-1). The SL-1 was a prototype power and heat source developed for use at remote military bases using a direct cycle, boiling water, natural circulation reactor designed to operate at a thermal power of 3,000 kW. The ARA II compound encompassed 3 acres and was comprised of (a) the SL-1 Reactor Building, (b) eight support facilities, (c) 50,000-gallon raw water storage tank, (d) electrical substation, (e) aboveground 1,400-gallon heating oil tank, (f) underground 1,000-gallon hazardous waste storage tank, and (g) belowground power, sewer, and water systems. The reactor building was a cylindrical, aboveground facility, 39 ft in diameter and 48 ft high. The lower portion of the building contained the reactor pressure vessel surrounded by gravel shielding. Above the pressure vessel, in the center portion of the building, was a turbine generator ...
With regard to the operation of nuclear power plants, Electricite de France formally recognized in 1973 that it was necessary for safety reasons and economically acceptable to adopt organizational principles of quality assurance that would be applicable both to its own activities and to those of its suppliers. Generally speaking, the form and spirit of the quality assurance programme chosen is based largely on the Code of Practice No. 50-C-QA. In particular, the programme focuses on the flexible character of quality assurance requirements and stresses that in the final analysis product quality depends above all on those to whom the project has been assigned, because it is they who are responsible for meeting the quality objectives set. Ten years of experience with the suppliers of Electricite de France has shown that these suppliers, after some initial difficulty, have been able to adapt the application of quality assurance so as to achieve satisfactory quality as ...
The DOE-Idaho Operations Office (DOE-ID) has prepared an environmental assessment (EA) on the replacement of the Idaho National Engineering Laboratory Health Physics Instrumentation Laboratory at the Idaho National Engineering Laboratory (INEL). The purpose of this project is to replace the existing Health Physics Instrumentation Laboratory (HPIL) with a new facility to provide a safe environment for maintaining and calibrating radiation detection instruments used at the Idaho National Engineering Laboratory. The existing HPIL facility provides portable health physics monitoring instrumentation and direct reading dosimetry procurement, maintenance and calibration of radiation detection instruments, and research and development support-services to the INEL and others. However, the existing facility was not originally designed for laboratory activities and does not provide an adequate, safe environment for calibration activities. The EA examined the potential ...
In 2004, the Southeastern France regional council asked the regional health observatory to conduct an environmental health inventory to i) identify environmental health problems in this area; ii) examine the relations between environmental exposure to pollutants and human health; and iii) help public officials to identify priorities in this area. We collected and validated data from national, regional and local institutions, constructed environmental (levels of emissions and pollutants), health (mortality, incidence, prevalence) and behavioral indicators (e.g., complaints about odors), and compared these over time and between places when possible. For each topic, we summarized current knowledge about the links between environment and health. In southeastern France, as in other French areas, indoor air pollution, home and leisure injuries and other home-related risks are public health issues. Other topics are more significant or particular to southeastern France: ...
Neutron Coded Aperture Imaging is a nondestructive imaging technique that utilizes neutrons scattered from an object through specially designed apertures. Coded Aperture Imaging is an alternative technique to Computed Tomography for three-dimensional imaging. Coded Aperture Imaging has the advantage that all of the three-dimensional information is contained in a single image, whereas Computed Tomography requires several images or projections. This technique has been implemented by other using photographic film as an image recording medium and optical reconstruction or decoding of the images. In this work, the possibility of using a real-time neutron video camera to record the images, followed by digital decoding methodology has been investigated. Because only a small fraction of the neutrons incident on the object are scattered to the neutron camera, a new neutron beamport facility, with a larger neutron flux (7.3 x 10[sup 7] n/cm[sup 2]/s) than the previous ...
During third quarter 1994, samples from AMB groundwater monitoring wells at the Metallurgical Laboratory Hazardous Waste Management Facility (Met Lab HWMF) were analyzed for selected heavy metals, indicator parameters, radionuclides, volatile organic compounds, and other constituents. Eight parameters exceeded standards during the quarter. As in previous quarters, tetrachloroethylene and trichloroethylene exceeded final Primary Drinking Water Standards (PDWS). Bis(2-ethylhexyl) phthalate exceeded final PDWS in one well. Aluminum, iron, manganese, tin, and total organic halogens exceeded the Savannah River Site (SRS) Flag 2 criteria. Groundwater flow direction and rate in the M-Area Aquifer Zone were similar to previous quarters. Conditions affecting determination of groundwater flow directions and rates in the Upper Lost Lake Aquifer Zone, Lower Lost Lake Aquifer Zone, and the Middle Sand Aquifer Zone of the Crouch Branch Confining Unit were also similar to previous quarters. During ...
Among KEPCO's 9 nuclear power units, Korea Nuclear Unit No. 3, the Wolsung Nuclear Power Plant is the only CANDU-PHWR Unit, while the rest of 8 others are PWR units. The unit was designed by Atomic Energy of Canada, Ltd. of Canada, who also performed overall project management for the plant construction under the provisions and arrangement of the relevant contracts. The gross electrical output of the plant is 678.7 MWe and thermal output of the reactor is 2061 MWth. While these figures lead to lower plant efficiency than LWR counterparts, unit energy cost for fuel is more favorable than LWRs because natural uranium is utilized for the fuel bundles, some of which are already being fabricated domestically. Annual capacity factors for 1983 and 1984 could have been improved, if two major planned outages for the modification works on steam generator internals and one major forced outage from the heavy water spill incident could be ...
'Improvement in understanding of the deposition of ambient dust particles on ECAM (Environmental Continuous Air Monitor) filters, reduction of the alpha-particle interference of radon progeny and other radioactive aerosols in different particle size ranges on filters, and development of ECAM''s with increased sensitivity under dusty outdoor conditions. As of May 1, 1998 (1/2 year into the project) the research-prototype 30-cm pulsed ionization chamber (PIC) is assembled and operational with an alpha particle energy resolution of better than 45 keV for 5-MeV alpha particles. Measurements of spectral resolution for alpha particles from radon decay products have been made as a function of filter type and dust loading conditions. So far, a study of ten filter types has found that the best combination of resolution and throughput is obtained with 3.0 \\265m Millipore fluoropore and 1.0 \\265m Corning FNMB filters. Experiments with gypsum and ...
The objective of the research was to develop a procurement method for small-diameter pulpwood based on chain-flail delimbing-debarking method. The study consisted of four parts: Development of the chain-flail delimbing-debarking method (based on Peterson Pacific DDC 5000 device); Combined chain-flail delimbing and drum-debarking; Processing and procurement of the chain-flail delimbing chips and; Intensifying of the timber debarking in chain-flail delimbing. The project was coordinated by Metsaeteho, and it was carried out as cooperation between Metsaeteho, the Finnish Forest Research Institute (METLA), VTT Energy, Pertti Szepaniak Oy and Enso-Gutzeit Oy. A calculation model, by which it is possible to determine the costs of pulpwood chips and fuel-rawmaterials formed beside the pulpwood chips while using different kinds of procurement methods and chains, was developed for chain-flail delimbing-debarking-chipping method based on utilization of Peterson Pacific ...
This study assesses the feasibility of the so-called heat pipe technique for cooling the piston of a mediumspeed diesel engine and is part of a research project 'EVE HPD, Extreme Value Engine Tests with High Power Density' carried out by HUT Internal Combustion Engine Laboratory. Diesel engines are being developed to give greater power from a given cylinder swept volume, which means higher temperatures in combustion chamber. The traditional oil cooling cannot be used beyond certain temperature level. Heat pipe technology could provide one solution to the cooling problem. The general properties, principles of operation, and structures of different types of heat pipes are described. Working fluids and container materials of heat pipes are discussed. The operation limitations of heat pipes are studied, especially, the limitations of a reciprocating heat pipe, in which the return of the condensate to the evaporator section is achieved by the movement ...
This document is a Final Technical Report that describes the results of the Geophex Airborne Unmanned Survey System (GAUSS) research project. The objectives were to construct a geophysical data acquisition system that uses a remotely operated unmanned aerial vehicle (UAV) and to evaluate its effectiveness for characterization of hazardous environmental sites. The GAUSS is a data acquisition system that mitigates the potential risk to personnel during geophysical characterization of hazardous or radioactive sites. The fundamental basis of the GAUSS is as follows: (1) an unmanned survey vehicle carries geophysical sensors into a hazardous location, (2) the pilot remains outside the hazardous site and operates the vehicle using radio control, (3) geophysical measurements and their spatial locations are processed by an automated data-acquisition system which displays data on an off-site monitor in real-time, and (4) the pilot uses the display to ...
The high-purity-oxygen activated sludge process will be used to expand secondary treatment capacity and improve water quality in Santa Monica Bay. The facility is operated by the city of Los Angeles Department of Public Works` Bureau of Sanitation. The overall Hyperion Full Secondary Project is 30% complete, including a new headworks, a new primary clarifier battery, an electrical switch yard, and additional support facilities. The upgrading of secondary facilities is 50% complete, and construction of the digester facilities, the waste-activated sludge thickening facility, and the second phase of the three-phase modification to existing primary clarifier batteries has just begun. The expansion program will provide a maximum monthly design capacity of 19,723 L/s(450 mgd). Hyperion`s expansion program uses industrial treatment techniques rarely attempted in a municipal facility, particularly on such a large scale, including: a user-friendly ...
A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power ...
Three reactive materials were evaluated at laboratory scale to identify the optimum treatment reagent for use in a Permeable Reactive Barrier Treatment System at Rocky Flats Environmental Technology Site (RFETS). The contaminants of concern (COCS) are uranium, TCE, PCE, carbon tetrachloride, americium, and vinyl chloride. The three reactive media evaluated included high carbon steel iron filings, an iron-silica alloy in the form of a foam aggregate, and a peculiar humic acid based sorbent (Humasorb from Arctech) mixed with sand. Each material was tested in the laboratory at column scale using simulated site water. All three materials showed promise for the 903 Mound Site however, the iron filings were determined to be the least expensive media. In order to validate the laboratory results, the iron filings were further tested at a pilot scale (field columns) using actual site water. Pilot test results were similar to laboratory results; consequently, the iron filings were chosen for the ...
The proposed action is to recycle slightly activated copper that is currently stored in a warehouse leased by Lawrence Berkeley Laboratory (LBL) to a scrap metal dealer. Subsequent reutilization of the copper would be unrestricted. This document addresses the potential environmental effects of recycling and reutilizing the activated copper. In addition, the potential environmental effects of possible future uses by the dealer are addressed. Direct environmental effects from the proposed action are assessed, such as air emissions from reprocessing the activated copper, as well as indirect beneficial effects, such as averting air emissions that would result from mining and smelting an equivalent quantity of copper ore. Evaluation of the human health impacts of the proposed action focuses on the pertinent issues of radiological doses and protection of workers and the public. Five alternatives to the proposed action are considered, and their associated potential impacts are addressed. The ...
Numerical models based on finite-difference or finite-element methods are used by various research groups in studies of radon-222 transport through soil and building materials. Applications range from design of radon remediation systems to more fundamental studies of radon transport. To ascertain that results obtained with these models are of good quality, it is necessary that such models are tested. This document reports on a benchmark test organized by the EU project ERRICCA: European Research into Radon in Construction Concerted Action. The test comprises the following cases: 1) Steady-state diffusive radon profiles in dry and wet soils, 2) steady-state entry of soil gas and radon into a house, 3) time-dependent radon exhalation from a building-material sample. These cases cover features such as: soil heterogeneity, anisotropy, 3D-effects, time dependency, combined advective and diffusive transport of radon, flux calculations, and ...
Since 1988, the Expertise group of Molecular and Cellular Biology (MCB) is an important partner in the development of the Micro-Ecological Life Support System Alternative (MELiSSA). The MELiSSA was designed to allow a small crew to survive on an Antarctic, lunar or Mars outpost, and is a joint research project currently fostered by the European Space Agency, ESA. The MELiSSA functions through a series of five interconnected compartments, of which four are microbial bioreactors and was engineered to degrade organic waste, regenerate the outpost's atmosphere and water, and provide the crew with an additional vegetarian diet. The bioreactor of the third compartment provides the edible cyanobacteria and plants of the fourth compartment with nitrate instead of ammonium as a source of nitrogen. The two bacteria responsible for the biological transformation of ammonium to nitrate (nitrification) are Nitrosomonas europaea and Nitrobacter winogradskyi. Since all ...
A complete analysis is performed to simulate biomass production incorporated into a realistic whole farm situation, including or replacing a typical crop mix. Representative farms are constructed to accommodate such simulation. Four management systems are simulated for each firm, with each simulation depicting a different crop mix and/or use of different farming technologies and production methods. The first simulation was a base farm plan in which the operator would maintain the historical crop mix for the area, participate in all price support programs, and not participate in either a conservative reserve or a biomass production program. In the second simulation, the operator would again maintain the historical crop mix, would not participate in a conservation reserve or biomass production program, and would be ineligible to participate in any price support system. The third simulation introduced the Conservation Reserve Program (CRP) and included participation ...
Due to thermal gradients and load changes steam-turbine casings suffer combined creep-fatigue loading. Creep and fatigue portions depend on service conditions. Special interest is focused on the behaviour of creep-fatigue cracks, originated from potential defects due to construction and manufacturing weldments, on residual lifetime assessment. The project deals with the crack-growth behaviour at 530deg C and r.t. of welded and unwelded heat-resistant cast steels: 1% CrMoV-cast (GS-17 CrMoV 5 11, two melts: low and high V-content) and 12% CrMoV-cast (G-X 22 CrMoV 12 1). The crack planes of CT-specimens investigated, taken from manual arc-welded plates, were situated in the heat-affected zone (HAZ). The fatigue, creep and combined creep-fatigue crack-growth behaviour was investigated by means of low-frequency (0.5 and 0.05 Hz) tests, holding-time (20 min) tests and constant load tests up to about 5 000 h. Metallographic investigations show that ...
The US Department of Energy (DOE) is now evaluating its facility requirements in support of its cleanup mission at Hanford. One of the early findings is that the 200-Area steam plants, constructed in 1943, will not meet future space heating and process needs. Because the 200 Area will serve as the primary area for waste treatment and long-term storage, a reliable steam supply is a critical element of Hanford operations. This Analysis and Decision Document (ADD) is a preliminary review of the steam supply options available to the DOE. The ADD contains a comprehensive evaluation of the two major acquisition options: line-term versus privatization. It addresses the life-cycle costs associated with each alternative, as well as factors such as contracting requirements and the impact of market, safety, security, and regulatory issues. Specifically, this ADD documents current and future steam requirements for the 200 Area, describes alternatives available to DOE for ...
Because of its high energy density, compatibility with aqueous electrolytes and the low toxicity of its active materials, the zinc-air battery system is an interesting candidate for electric vehicle applications. The use of O{sub 2} from the air as a reactant requires a partially open cell construction and a technologically challenging air interface. This report describes the research and development program at the Paul Scherrer Institute which finally led to the demonstration of a durable, electrically rechargeable zinc-oxygen battery. In a first phase the research program was focused on the development of bifunctional oxygen diffusion electrodes and pasted zinc electrodes. The current-potential behaviour and the cycle life performance of anodes and cathodes was tested in single electrode measurements (three-electrode arrangements) as well as in complete monopolar zinc-oxygen and zinc-air cells. La{sub 0.6}Ca{sub 0.4}CoO{sub 3}-activated bifunctional oxygen ...
Over the past 40 years, cavern storage of LPG's, petrochemicals, such as ethylene and propylene, and other petroleum products has increased dramatically. In 1991, the Gas Processors Association (GPA) lists the total U.S. underground storage capacity for LPG's and related products of approximately 519 million barrels (82.5 million cubic meters) in 1,122 separate caverns. Of this total, 70 are hard rock caverns and the remaining 1,052 are caverns in salt deposits. However, along the eastern seaboard of the U.S. and the Pacific northwest, salt deposits are not available and therefore, storage in hard rocks is required. Limited demand and high cost has prevented the construction of hard rock caverns in this country for a number of years. The storage of natural gas in mined caverns may prove technically feasible if the geology of the targeted market area is suitable; and economically feasible if the cost and convenience of service is competitive with ...
This report presents highlights of activities in the Acceleartor Technology (AT) Division from April through December 1978. The report is divided into 10 sections to cover work done by the four groups that make up AT Division (AT-1, AT-2, AT-3, and AT-4). Section I is a brief summary of the whole report. Sections II through VI describe work done by At-1, the Linac Technology Group. Subjects covered are the Pion Generation for Medical Irradiation Program, the Electronuclear Fuel-Producing Accelerator Program, the Gyrocon rf Amplifier Program, the Electron Linear Accelerator Program, and the Free Electron Laser Program. Section VII covers the Linear Accelerator Beam Dynamics development, and Sec. VIII deals with work with the H/sup -/ Ion Source. Most of the work in Secs. VII and VIII was done by AT-2, the Special Projects Group, although work on factors influencing emittance growth was done by MP-9, and results on emittance growth in the new European Council for ...
This paper reviews three key initiatives undertaken in the historical city of Oxford to bring about reductions in energy-related CO_2 emissions on a city-wide scale. The author has been part of all the three initiatives. In 2002, a collaborative partnership between academia, industry and city council started the Oxford Solar Initiative (OSI) which uses a community-based approach to help households and organisations in Oxford, financially and technically, to install solar energy systems and energy efficiency measures in buildings. So far OSI has facilitated the installation of 80 active solar systems, over 450 energy efficiency measures and 3,000 low energy bulbs. The scientific basis of OSI is a GIS-based DECoRuM model which estimates and maps baseline energy use and CO_2 emissions on a house-by house level, identifies 'pollution' hotspots, predicts the potential for reductions in CO_2 emissions and monitors reductions achieved as a result of deploying energy efficiency measures and ...
Two constructions due to Dr\\'apal produce a group by modifying exactly one quarter of the Cayley table of another group. We present these constructions in a compact way, and generalize them to Moufang loops, using loop extensions. Both constructions preserve associators, the associator subloop, and the nucleus. We conjecture that two Moufang 2-loops of finite order $n$ with equivalent associator can be connected by a series of constructions similar to ours, and offer empirical evidence that this is so for $n=16$, 24, 32; the only interesting cases with $n\\le 32$. We further investigate the way the constructions affect code loops and loops of type $M(G, 2)$. The paper closes with several conjectures and research questions concerning the distance of Moufang loops, classification of small Moufang loops, and generalizations of the two constructions.
This Fact Sheet presents the mission of the West Valley Demonstration Project and information on the 1994 pollution prevention and recycling accomplishments.
Project methodology, analysis of the occupational and training situation, task analysis process, design process for a systematic training plan specific to the job position are described.
... Materials Research - Major Instrumentation Project (IMR-MIP) program in the Division of Materials ... for materials preparation and characterization essential for researchers studying materials in a ...
A design is proposed for forming the rear screen of a chamber firebox at the point of aerodynamic projection and a design for attaching the pipes of the aerodynamic projection using girders linked with the screen by hinges and movable connections.
This thesis deals with the analysis of dominant loss mechanisms in direct methanol fuel cells (DMFC) and hydrogen fed polymer electrolyte membrane fuel cells (PEFC) by means of experimental characterization and modeling work. Due to different fuels used in these two fuel cell types, the dominant loss mechanisms are different in their nature. All in-situ characterization techniques that are used in this work are based on a novel test fuel cell with embedded reference electrodes. The first part of this work presents a new concept for realizing a reference electrode configuration in a polymer electrolyte membrane fuel cell by means of laser ablation. The laser beam is used to evaporate a small gap into the electrode surface of a catalyst coated membrane (CCM) to isolate the reference electrode from the working/counter electrode (WE/CE). This method enables the simultaneous ablation of the electrodes on both sides of the CCM because the membrane is transparent for the laser beam. ...
Project finance is asset-based financing, meaning that the project lenders have recourse only to the underlying assets of a project. It involves both debt and equity, where the debt-to-equity ratio is typically large (e.g., 70% debt to 30% equity). Debt is used when available and when it is the least expensive form of financing, with equity still needed for credit worthiness. Most important, revenue from the project must be able to generate a return to the equity investors, and pay for interest and principal on the debt, transaction costs associated with developing and structuring the project, and operations and maintenance costs. Successful project financing must provide a structure to manage and share risks in an optimal way that benefits all participants, allocating risks to those entities that are able to mitigate each specific risk, and to share information ...
Requirements for the installation, inspection, and testing that assure the quality of important components of a nuclear power plant during construction are presented.
A theoretical framework centering on four classes of self-referent constructs is offered as a device for integrating the diverse areas constituting medical sociology. Guidance by this framework...Full Text Available
On the basis of the resolvent of a simple differential operator, a method for finding approximations to continuous functions is constructed. In this method, both the approximated function and its approximations satisfy the given integral boundary condition.
A historical prospective mortality study was conducted on a cohort of 34 156 male members of a heavy construction equipment operators union with potential exposure to diesel exhaust emissions. This...Full Text Available
A novel approach to the Bragg curve spectroscopy is utilized to construct a charged particle detector which makes fragment elemental identification and energy measurement possible. The advantage of the construction includes good timing and spectroscopic properties with a very low energy threshold. ((orig.))
A previous study demonstrated the advantages that could be obtained in using loose liner naval gun barrel construction, particularly if the liner is autofrettaged. This report deals with the longitudinal forces required to assemble and disassemble such co...
In an era of unprecedented technological advancement and economic expansion, construction practice continues to evolve but construction education has not changed appreciably since the 1990s. This schism has prompted industry, government, and other key constituents to question the relevancy and efficacy of current programs. The Accreditation Board for Engineering and Technology (ABET) Engineering Criteria 2000 and the American Council for Construction Education (ACCE) emphasizes outcomes over process, and provides an opportunity for stakeholders to help universities define educational goals and objectives and design a curriculum to meet the desired outcomes. While the need for curriculum modification has been acknowledged, the industry position was amorphous and anecdotal and therefore difficult to address. Qualitative methodologies such as formal surveys and structured interviews can be used to capture and quantify industry ...
A substantial design and development program has been underway in the United States of America on the Darrieus vertical axis wind turbine (VAWT). The purpose of this report is to present currently available information on: design, construction, and testin...
The computer aided coal structure construction system is proposed, and a computational construction example is presented. The coal structure construction engine of this system fabricates molecular structure by connecting fragments sequentially inputted through a user interface. The best structure candidate is determined using construction knowledge and partial energy evaluation every addition of one fragment, and this process is subsequently repeated. The structure evaluation engine analyzes the 3-D conformation candidate by molecular dynamics, and evaluates the conformation by determining the energy value of an optimum structure. As an example, this system was applied to construction of coal molecular structure based on the actual data of partial structure composed of 26 structures from 2l kinds of aromatic cluster structures, 27 bonds from 2 kinds of bridged bonds, and 16 groups ...
Thermodynamic Stable Metal Compositions for Improvement of an Operational Safety of Constructional Materials under Conditions of Multifactor Loadings of an Aggressive Environment
Discusses design of unconventional pneumatic forms for construction of monolithic liners in mine roadways driven by drilling and blasting. The forms were developed for construction of the municipal subway in Leningrad. They were successfully tested in the Pavlogradugol' mines for construction of chambers situated at shaft bottom at depths of 420 m. The chambers were situated in unstable rock strata. A set of pneumatic forms consisted of 4 to 7 units, each 0.4 m thick and 1.2-2.2 m long. Air pressure was 0.03 MPa, installation time was about 20 min. Service life of pneumatic forms ranged from 3 to 4 years.
Innovative new ideas for the construction of homes are described. A thermal energy storage system fireplace and a geothermal heat pump for homes are described.
Nanoparticles represent versatile building blocks in material science and nanotechnology. Thereby, the defined assembly of nanostructures (13 and 56 nm in diameter, respectively) is of significant importance. Short DNA sequences can be bound to the nanoparticle surface thus enabling highly specific DNA hybridization-driven events that direct the formation of nanoparticle constructs.In this paper, examples for the defined formation of gold nanoparticle constructs are demonstrated. In addition, gold-silver core-shell nanoparticles are introduced as further building blocks for the hybridization-controlled formation of nanoparticle constructs.
... concentrated on the construction of switches using fiber ... been chosen for a switch realized in ... of these techniques using acousto-optic modulators or ...
... nent to the design and construction of metal-semiconductor solar cells, in that both the photovoltage and the efficiency of metal-semiconductor cells ...
Three types of drift chambers are being constructed for the Fermilab D/O/ experiment. The construction and readout of these chambers stress good spatial resolution, good two hit separation, and dE/dx. A 106 MHz FADC system with hardware zero suppression is being constructed to readout this system. 8 refs., 12 figs., 1 tab.
Appendix B to 10 CFR Part 50 establishes overall quality assurance requirements for the design, construction and operation of safety-related structures, systems, and components. This guide presents a method acceptable to the Commission for complying with these regulations with regard to overall quality assurance program requirements during design and construction of nuclear power plants. Input to this guide has been provided by the Advisory Committee on Reactor Safeguards.
The special geodetic problems encountered during the construction of the Paks nuclear power plants are treated. The main building with its hermetically connected components including the reactor, the steam generators, the circulation pumps etc. impose special requirements on the control net of datum points. The geodesy tasks solved during the construction of the main building are presented in details.
This comprehensive guide offers several tried and true steps to help you successfully manage the complex process of developing free software. Topics include project management, developer motivation, technical infrastructure to support collaboration, and project promotion. Producing Open Source Software is ideal for developers starting their own free software projects, or people who simply want to participate in the process.
I travelled to San Jose, Costa Rica on July 8, 1990 to evaluate all of the completed elements of the ongoing feasibility study for the San Lorenzo River hydroelectric project. The feasibility study is being supported by ORNL under the Renewable Energy Applications and Training Project. The project is being studied for implementation by CONELECTRICAS, a consortium of rural electric cooperatives and the study itself is being conducted by BEL Engineering, a Costa Rican consulting firm under contract to CONELECTRICAS, USAID/PIC and NRECA.
While substantial research has examined the control of information systems (IS) projects, most studies in this area have only examined how one controller manages a single group of controllees. However, many IS projects, especially enterprise systems projects (often initiated by an organization's corporate headquarters, and involving business unit users and consultants), have multiple stakeholders. The corporate headquarters (the project's principal controller) must simultaneously ensure that the various stakeholders are aligned with the project's goals despite their diverse motivations, and that the stakeholders collaborate with each other to achieve project success. Behavior control theory argues that the controller enacts a control portfolio of formal and informal controls. However, the ...
The Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-0017) has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical, data management and communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring and Evaluation (RME) program to assess the status of anadromous salmonid populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods, requires the testing of multiple approaches. Thus, the approach ISEMP has adopted is to develop a broad template ...
The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.
The further optimisation and improvement of the efficiency of internal combustion engines require the realisation of new technologies leading to a distinctively faster warm-up behaviour of the coolant and lubricants as well as of the engine components after a cold start. In order to achieve reduced fuel consumption and exhaust gas emissions with the help of heat management, the design criteria of innovative cooling systems need to be reflected and adapted to future requirements. The use of intelligent components within the cooling system, such as the 'Stand Alone Rotary Valve' as a thermostat's substitute or the use of coolant pumps with a rotary valve integrated into the pump's inlet chamber, offer new ways to realise in a decisively quicker and more flexible way the appropriate heating up and cooling down procedures at varying driving conditions. A description of both of the intelligent components for the cooling system is given in this paper. The ...
For the construction of underground facilities comprising access tunnels, connecting tunnels, main tunnels and disposal tunnels, a large number of tunnels will be excavated in deep rock formations. These excavations will extend hundreds kilometers in total length. Therefore, special attention must be paid, to transporting large volume of debris, ventilation, emergency escape routes in case of accident, and other factors. In addition, special attention must also paid to potential accidents which might in underground excavations, including unstable facing phenomena (such as collapse and swelling of facing at weak layer sections), spring water flow resulting collapse of rock, gas eruption, and rock burst. While considering these factors to be emphasized during the construction of geological disposal facilities, the investigation reviewed the existing working methods on individual construction technologies of access tunnels, ...
For the construction of underground facilities comprising access tunnels, connecting tunnels, main tunnels and disposal tunnels, a large number of tunnels will be excavated in deep rock formations. These excavations will extend hundreds kilometers in total length. Therefore, special attention must be paid, to transporting large volume of debris, ventilation, emergency escape routes in case of accident, and other factors. In addition, special attention must also paid to potential accidents which might in underground excavations, including unstable facing phenomena (such as collapse and swelling of facing at weak layer sections), spring water flow resulting collapse of rock, gas eruption, and rock burst. While considering these factors to be emphasized during the construction of geological disposal facilities, the investigation reviewed the existing working methods on individual construction technologies of access tunnels, ...
The proton beam has an advantage of the sharp dose falloff in dose distribution called Bragg peak while conventional radiation therapy modalities such as photons exhibit considerable amount of exit dose. To take advantage of this property it is important to know the exact location of the distal dose falloff. An error can cause overdose to the normal tissue or underdose to the tumor volume. The only way of finding out the dose distribution in-situ in particle therapy is to measure the gammas produced by nuclear reactions with tissue materials. Two kinds of gammas can be used: one is prompt gamma and the other is coincident gamma from the positron-emission isotopes. We chose to detect prompt gammas, and developed a prompt gamma scanning system (PGS). The proton beams of the proton therapy facility at National Cancer Center were used. The gamma distribution was compared to the dose distribution measured by an ionization chamber at three different energies of 100, 150, 200 MeV's. ...
Presently, industrial maturity can be claimed for two fuel cycle strategies, viz. the 'Once Through Fuel Cycle' (OTC), and the 'Reprocessing Fuel Cycle' (RFC) in which plutonium and very limited uranium quantities are being recycled. It is helpful to recall some key data that set the stage for any discussion of fuel cycle options: 1. Worldwide, the annual spent fuel discharge is in the range of 10500-11000 t heavy-metal (HM), while the industrial reprocessing capacity amounts to #approx# 5000 t HM (OECD NUCLEAR ENERGY AGENCY, Accelerator-driven Systems (ADS) and Fast Reactors (FR) in Advanced Nuclear Fuel Cycles: a Comparative Study, Paris, 2002). Hence, less than 1/2 of the discharged spent fuel can be processed. 2. Worldwide, the cumulative inventory of stored spent fuel is estimated to be #approx# 190000 t HM, and the amount of reprocessed spent fuel is estimated to be #approx# 70000 t HM. The latter inventory has been transformed into high-level waste (HLW) and spent light water ...
Limited demand and high cost has prevented the construction of hard rock caverns in this country for a number of years. The storage of natural gas in mined caverns may prove technically feasible if the geology of the targeted market area is suitable; and economically feasible if the cost and convenience of service is competitive with alternative available storage methods for peak supply requirements. It is believed that mined cavern storage can provide the advantages of high delivery rates and multiple fill-withdrawal cycles in areas where salt cavern storage is not possible. In this research project, PB-KBB merged advanced mining technologies and gas refrigeration techniques to develop conceptual designs and cost estimates to demonstrate the commercialization potential of the storage of refrigerated natural gas in hard rock caverns. Five regions of the U.S.A. were studied for underground storage development and PB-KBB reviewed the literature ...
One of the challenges facing Clean Development Mechanism (CDM) projects today is their limited ability to secure financing for the underlying greenhouse gas emission reduction activities, particularly in the least developed countries. Among the key reasons for this is the fact that most financial intermediaries in the CDM host countries have limited or no knowledge of the CDM Modalities and Procedures. Moreover, approaches, tools and skills for CDM project appraisal are lacking or are asymmetrical to the skills in comparable institutions in developed countries. Consequently, developing country financial institutions are unable to properly evaluate the risks and rewards associated with investing or lending to developers undertaking CDM projects, and therefore have, by-and-large, refrained from financing these projects. In addition, some potential project proponents lack experience in ...
Wood is currently having a renaissance as a domestic fuel. Wood pellets, usually about 8 mm in diameter and 40 mm long and produced from sawmill and wood processing residues by pressing without binders, are gaining general acceptance. According to a market analysis of Solar Promotion GmbH, Pforzheim, about 4,800 pellet-fuelled heating systems with automatic fuel supply and with a total thermal capacity of 35 kW are in operation in Germany, and 2000 new ones were installed in 2000. [German] Holz als Brennstoff erlebt in vielen Heizkellern und Kaminen eine Renaissance. Und zwar nicht in Form von Holzscheiten, sondern als kleine Presslinge, meist mit einem Durchmesser von acht und einer Laenge von bis zu 40 Millimetern. Als Abfallprodukt von Saegewerken und Holz verarbeitenden Betrieben werden die so genannten Pellets unter hohem Druck und ohne Bindemittel wie beispielsweise Leim hergestellt. Und dieser neue Brennstoff findet immer mehr Anhaenger. So sind im ...
This 7th edition reveals the progress in steam engineering and the great future potential of steam engineering applications. Pollution abatement and design experiences gained during the operation of existing plants, and experiences gained in waste incineration are of environmental relevance. Recent materials developments and knowledge, e.g. as regards pipes and fittings, have been making significant contributions to supercritical-steam efficiency improvements. Emphasis is also placed on automation, control engineering, water chemistry etc., and on regulations, licensing procedures, and the training of the staff of plants. (orig./KOW) [Deutsch] Die nunmehr vorliegende 7. Ausgabe zeigt den Fortschritt und das zukuenftig noch erhebliche Potential dieser Technik auf. Erfahrungen mit den nun schon seit Jahren laufenden Anlagen zur Schadstoffminderung, Konstruktion und Auslegung sowie Betriebserfahrungen zur thermischen Abfallverwertung sind Schwerpunkte im Umweltbereich. ...
The nozzle-group regulation of steam turbines plays furtheron an important role in the operation of power stations owing to modern, adaptable control-technical valve timing possibilities. New procedures for a choice-connection of different nozzle areas via the control valves as well as the use of valve laps require, however, a differentiated consideration of the loss mechanism in the inlet area of the turbine, in order to be able to assess and minimize its specific heat consumption also at the operational points outside the layout- and calculation-technically fixed guarantee or valve points, respectively. The basic technical-physical stages to this are explained. (orig.) [Deutsch] Die Duesengruppenregelung von Dampfturbinen nimmt nicht zuletzt dank moderner, anpassungsfaehiger leittechnischer Ventilansteuerungsmoeglichkeiten weiterhin eine bedeutende Stellung beim Betrieb von Kraftwerken ein. Neue Verfahren zur wahlweisen Zuschaltung unterschiedlicher ...
The ECOTEC combustion system and the architecture of the new Opel 2.2 l aluminum engine have been configured to achieve low noise and exhaust emissions. This power unit, employed in Germany for the first time in the Astra Coupe, already complies with the Euro IV emissions standard. It features minimum maintenance requirements and a long operating life. The DOHC spark-ignition engine with four valves per cylinder has two chain-driven camshafts, valve gear with roller cam followers and hydraulic lash adjusters. Two chain driven balancer shafts have been integrated into the engine block. The cylinder head and block, lower crankcase, oil pan, and cylinder head cover are all made of aluminum. A modular concept makes it possible to adapt the engine effectively to different vehicle concepts and markets. (orig.) [German] Das ECOTEC-Verbrennungssystem und die Motorarchitektur des neuen 2,2-l-Aluminium-Triebwerks von Opel sind auf niedrige Geraeusch- und Abgasemissionen ausgelegt. Das in ...
Two of the working sessions of the meeting were devoted to aspects of international atomic energy law; the international character of the meeting was also reflected by the home countries of the members of the panel discussion concluding the working sessions. There was substantial reason to put emphasis on the international dimension of the topics discussed. In June 1994, the Nuclear Safety Convention had been signed in Vienna by diplomatic representatives of the signatory countries, and this Convention marks a signpost in the history of international atomic energy law. At the time the meeting was held, negotiations for improving the international nuclear lability law, which had been dragging on since 1989, had come to a stalemate. The meeting offered a suitable forum for taking a scientific approach to tackle the complex problems involved in reshaping the law on nuclear safety and nuclear liability. The third working session of the meeting has been discussing topics relating to the ...
Already, MR Imaging is superior in diagnostic imaging of joints in many cases; however, there have been recent developments, which are the subjects of this paper. With gradient-echo sequences acquired in 3D technique, it is possible to produce high-resolution images of joints in acceptable scantime, because gradient-echo sequences are less time-consuming than convential SE sequences. With the acquisition of two echoes, phase difference between water and fat protons have to be considered. 3D Imaging is capable of displaying complex pathology in a superior way, which should be useful in preoperative planning. Tissue contrast is altered by fat saturation or magnetization transfer in order to achieve better conspicuity of lesions. Although diagnostic value of some of these options is not yet clear and further clinical studies are needed, they are a promising possibility for improving MR Imaging of the joints. (orig.) [Deutsch] In der Gelenkdiagnostik gibt es einige neuere Entwicklungen in ...
For location of leakage at district heating pipelines several techniques are available today. If there is no wire bound lead monitoring system installed, the DH company has to apply mobile methods for detection and location and if possible characterization of leakage. Most mobile methods available today are restricted in application and often they cause supply disconnections, especially the location of very small leaks is difficult. The Institute for Environmental, Safety and Energy Technology (UMSICHT) has tested a new developed method that can be executed by own employees of DH companies that can be realised parallel to normal supply mode, and that is able to locate and characterize even very small leakages. (orig.) [Deutsch] Zur Lecksuche an Fernwaermeleitungen stehen verschiedene Techniken zur Verfuegung. Wurde beim Bau der Fernwaermetrasse kein drahtgebundenes Ueberwachungssystem eingebaut, ist der Netzbetreiber auf mobile Lecksuchmethoden angewiesen. Die herkoemmlichen mobilen ...
In order for fuel cells to be successful, a full-scale hydrogen infastructure is required. The HyTra concept is presented here (HYdrogen TRAnsform, Transfer and TRAnsport) involves combined production, storage and supply of hydrogen in a transportable trailer, i.e. it is both a hydrogen production unit and a mobile filling station. The trailer can be transported to the selected site, where it will produce gaseous hydrogen from electricity and water by electrolysis. A compressor pumps the gas into an internal pressure tank and compresses it to filling pressure. Filling takes place by the overflow principle via a flexible high-pressure line with a standardised H{sub 2} filling unit. (orig.) [German] Um die Marktdurchdringung der Brennstoffzellentechnik gewaehrleisten zu koennen, muss eine flaechendeckende Wasserstoffinfrastruktur aufgebaut werden. Das neue HyTra-Konzept (HYdrogen TRAnsform, TRAnsfer and TRAnsport) beruht auf der Kombination von Wasserstoff-Erzeugung, ...
High oleic acid sunflower oils have been commercially available for some years now. Due to their high content of monounsaturated fatty acids these oils have a number of potential applications in the oleochemical industry, especially where technical oleic acids and their derivatives are used. Whereas conventional sunflower oil contains approx. 68% linoleic acid (C{sub 1}8:2), it is now possible through breeding measures to obtain ''new sunflower oils'' (NSb oils) with oleic acid levels of 70-95% oleic acid (C{sub 1}8:1). The oil itself is of interest for technical applications: it is light-coloured, has a neutral odour and is relatively resistant to oxidation. Plant oils, especially those with a low content of polyunsaturated fatty acids, are increasingly gaining interest as ester oils in technical application areas, e.g. as lubricants. However, there are limits to the technical applicability of triglycerides due to their temperature behaviour or ...
The required introduction of on board diagnosis II in the USA from the 94 models onward has led vehicle manufacturers and system suppliers to develop corresponding diagnosis processes at the beginning of the 1990`s. These systems are now in mass production for TLEV and partly for LEV requirements. Based on experience from the wide use of these functions, new knowledge has been obtained, which must be taken into account in the development of future systems. The additionally more severe emission and diagnosis requirements make further minimisation of the overall tolerances on the one hand, and a revision of the existing diagnosis algorithms necessary. In parallel with this, the Law must create the necessary outline conditions, where the requirements for the vehicle manufacturer and system suppliers must also be met. The OBD II development must therefore certainly not be regarded as complete. [Deutsch] Die in den USA ab Modelljahr `94 geforderte Einfuehrung der On Board Diagnose II hat zu ...
This report presents and discusses results from Task 5 of the study ''Fate of Mercury in Synthetic Gypsum Used for Wallboard Production,'' performed at a full-scale commercial wallboard plant. Synthetic gypsum produced by wet flue gas desulfurization (FGD) systems on coal-fired power plants is commonly used in the manufacture of wallboard. The FGD process is used to control the sulfur dioxide emissions which would result in acid rain if not controlled. This practice has long benefited the environment by recycling the FGD gypsum byproduct, which is becoming available in increasing quantities, decreasing the need to landfill this material, and increasing the sustainable design of the wallboard product. However, new concerns have arisen as recent mercury control strategies developed for power plants involve the capture of mercury in FGD systems. The objective of this study is to determine whether any mercury is released into the atmosphere when the ...
The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.
We combine data from the Latin American Migration Project and the Mexican Migration Project to estimate models predicting the likelihood of taking of first and later trips to the United States...Full Text Available
The energy strategy of the UK Overseas Development Administration is outlined with specific emphasis on energy efficiency and renewable energies. Based on 29 case studies concerning projects and programmes in both developed and developing countries, critical success factors for renewable energy projects are identified. UK)
It has been of interest whether and when the rearrangement of neuronal circuits can be induced after projection patterns are formed during development. Earlier studies using cats reported that the rearrangement...Full Text Available
... 2 km (0-1.2 mi) of new onshore pipelines projected as a result of proposed Lease Sale ... 2 km (0-1.2 mi) of new onshore pipelines projected as a result of proposed Lease Sale ... ...
Abstracts of research projects are presented in the following areas: measurements and special facilities; cellular and subcellular studies; physiology; behavior; environmental effects; modeling, scaling and dosimetry; and high voltage direct current. (ACR)
million for advanced energy projects Thu, Sep 29, 2011 - Project Aims to Bring Bio-based Jet Fuel Production to the Northwest Mon, Sep 12, 2011 - Drive like the wind Thu, Aug 25,...
This quarterly update contains information on the National Bioenergy Center Biochemical Platform Integration Project, R&D progress and related activities.
... Highly-Functional Materials" was launched in JFY1996 under the New Materials field. This project was ... Bio-mimetic materials" (1) Advanced stimuli responsive materials (2) Harmonized molecular materials ...
Phase 2 of the four phase NASA/DoD Aerospace Knowledge Diffusion Research Project was undertaken to study the transfer of scientific and technical information (STI) from government to the aerospace industry and the role of librarians and technical informa...
...PROJECTS We are funded by industry, public bodies, charities and research councils and we are proud of the research projects undertaken by our world-class research groups . Research News To read more about our latest research to hit the media go to our News & Events page ...
As the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program initiates new cost-shared solar energy R&D under the Solar America Initiative (SAI), it is useful to analyze the experience gained from cost-shared R&D projects that have been funded through the program to date. This report summarizes lessons learned from two DOE-sponsored photovoltaic (PV) projects: the Photovoltaic Manufacturing Technology/PV Manufacturing R&D (PVMaT/PVMR&D) project and the Thin-Film PV Partnership project. During the past 10-15 years, these two projects have invested roughly $330 million of government resources in cost-shared R&D and leveraged another $190 million in private-sector PV R&D investments. Following a description of key findings and brief descriptions of the PVMaT/PVMR&D and Thin-Film PV Partnership ...
This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005
...October 2006 - present: University of Leeds, UK PhD Candidate in Geochemistry Thesis Title: Magnetite formation in reducing natural environments Supervisors: Dr Liane G. Benning ...Germany Bachelor of Science in Geosciences and Astrophysics Project Details Project Title: \\
funded these sensors as the first Discovery Mission of. Opportunity, part of the ... aboard a Russian Soyuz rocket. .... the Swedes on other projects, mainly sounding rocket projects. ..... incoming applications for the Fellowship Program, fielding ...
In summer 2000, the Cushing/Whitney Medical Library at Yale University began a demonstration project to digitize classic articles in neurosurgery from the late 1800s and early 1900s. The objective of...Full Text Available
The Cordoba and Wolsung projects mark the entry into the international sales arena of the standardized Canadian 600 MWe CANDU-PHW reactor design. The Cordoba station experienced a setback in the early stages when severe inflation in Argentina led to a ren...
Objective: The paper describes and evaluates the use of Clinical Digital Libraries Project (CDLP) digital library collections in terms of their facilitation of timely clinical information...Full Text Available
The ''biotechnology 2000'' project is supervised by the project sponsor ''biology, energy, ecology'' at Forschungszentrum Juelich on behalf of the Federal Ministry for Research and Technology. The project activities cover the development of techniques and methods, cell biology, gene structure and gene regulation, photosynthetic production processes, biological hydrogen production, synthetic biology, protein design, neurobiological research, biosystems, plant breeding, phytomedicine and plant protection, the biology of waste disposal methods, research into methods which replace animal experiments, biological safety research, technology risk assessment, and ethical aspects. A general survey introduces the promoted projects, and standardized data sheets briefly introduce the individual activities. The appendix gives the ...
This report describes Northern Indiana Public Service Co. project efforts to develop an automated energy distribution and reliability system. The purpose of this project was to implement a database-driven GIS solution that would manage all of the company's gas, electric, and landbase objects.
There are various interesting semantics' (extensions) designed for argumentation frameworks. They enable to assign a meaning, e.g., to odd-length cycles. Our main motivation is to transfer semantics' proposed by Baroni, Giacomin and Guida for argumetation frameworks with odd-length cycles to logic programs with odd-length cycles through default negation. The developed construction is even stronger. For a given logic program an argumentation framework is defined. The construction enables to transfer each semantics of the resulting argumentation framework to a semantics of the given logic program. Weak points of the construction are discussed and some future continuations of this approach are outlined.
Due to the general market conditions, the construction of steam turbines was greatly reduced in 1987. As in 1986, it came to a downward movement. This situation will heighten in the coming years. The exploitation of devices, which are available by way of the development of EDP in computation, construction, production and operation, leads to considerable improvements. These improvements can only be employed gradually, due to the reduction in production. However, technological progress can be used economically in part in the restoration of old installations. Here turbine construction, the thermodynamical interpretation of gas and steam turbines, developments in the field of conduction technology, piping and materials are described. Also improvements in operation security and operation supervision of the installations is treated, as well as service and maintenance of the plants. (BR) With 131 refs.
All sections of the third edition of this well-known textbook have been revised and enlarged in consequence of the change-over to SI units. Numerous examples and illustrations have been included or replaced by new ones. The book considers the latest research results as well as the constructive developments of industrial steam turbine construction. On a scientific basis, this plain book imparts basic knowledge of the design, calculation, execution, condensation and performance in service of steam turbines of all types. The well-founded introduction, together with many calculated examples addresses the student as well as the engineer.
The LHC is designed to provide proton beams of 7 TeV and nominal luminosity of 10**34 cm**-2s**-1. This objective is achieved at an affordable cost by pushing all major collider components to the limits of technology, by upgrading the existing CERN accelerators and infrastructure, and by involving the technical expertise, resources and dedication of accelerator laboratories world-wide. Following a decade of intensive R&D and technical validation of major collider systems, the LHC construction is now fully underway. Major industrial contracts have been awarded and are in execution for the procurement of the magnet, cryogenics and other systems. In this report, the status of the design and construction of the major LHC systems is presented.
Due to development of electric power system and considering an increase of electrical energy consumption, needs for larger units in new power plants are obvious. Connection of large nuclear power plants to the grid, depending on their power and location, usually requires significant investments in transmission network development and construction. Considering the capacity of the 400 kV transmission network in Croatia, this problem is evident. This paper deals with the possibilities of nuclear power plants construction, as one possible option in electric power system development, and their interconnection to the electricity grid. (author).
Several short model SSC 50 mm bore dipoles are being built and tested at Fermilab. Mechanical design of these magnets has been determined from experience involved in the construction and testing of 40 mm dipoles. Construction experience includes coil winding, curing and measuring, coil end part design and fabrication, ground insulation, instrumentation, collaring and yoke assembly. Fabrication techniques are explained and construction problems are discussed. Similarities and differences from the 40 mm dipole tooling and management components are outlined. Test results from the first models are presented. 19 refs., 12 figs.
This largely expository paper first gives an introduction to Hilbert stability and its use in Gieseker's GIT construction of $\\overline{M}_g$. Then I review recent work in this area--variants for unpointed curves that arise in Hassett's log minimal model program, starting with Schubert's moduli space of pseudostable curves, and constructions for weighted pointed stable curves and for pointed stable maps due to Swinarski and to Baldwin and Swinarski respectively. The focus is on the steps at which new ideas are needed. Finally, I list open problems in the area, particularly some arising in the log minimal model program that seem inaccessible to current techniques.
This construction curriculum guide on masonry for secondary students is one of six developed for inservice teachers at Marianas High School in Saipan. The guide provides the rationale, description, goals, and objectives of the program; the program of studies and performance objectives by levels; samples of lesson plans for effective delivery of instruction; and a listing of references. Concepts covered include orientation to masonry construction, safety, tools and equipment, cement, concrete, concrete block masonry, concrete forms, and concrete reinforcement. Appended materials include transparency copies, tests and answer keys, information sheets, and student activities. (CT)
In several recent papers on entanglement in relativistic quantum systems and relativistic Bell's inequalities, relativistic Bell-type two-particle states have been constructed in analogy to nonrelativistic states. These constructions do not have the form suggested by relativistic invariance of the dynamics. Two relativistic formulations of Bell-type states are shown for massive particles, one using the standard Wigner spin basis and one using the helicity basis. The construction hinges on the use of Clebsch-Gordan coefficients of the Poincare group to reduce the direct product of two unitary irreducible representations (UIRs) into a direct sum of UIRs.
This forum showcases the work of a variety of different heritage-based centers, organizations, and projects dedicated to research, education, and preservation of tangible and intangible forms of cultural heritage. The descriptions of these centers demonstrate the diversity of heritage work being done today. The centers and projects described in the forum vary in their contexts, missions, and outcomes. Highlighted in the forum are preservation organizations, university-based heritage centers, and a global collaborative cultural heritage project. Each organization in the forum provides information about their missions and goals, their approaches or methods to heritage work, and a brief description of some of their initiatives.
... Title : Refining the Magnetic Forming Capability. ... Abstract : The purpose of this project was to refine the in-house magnetic forming capability. ...
The projects described in this report represent the Laboratory's investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides, a) a director's statement, b) an overview of the laboratory's LDRD program, including PNNL's management process and a self-assessment of the program, c) a five-year project funding table, and d) project summaries for each LDRD project.
... projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan, without ...
This article describes the steps taken to mitigate the impact to existing wetlands by creating new wetlands in an airport expansion project. The project addressed maintaining suitable amounts of wetlands to accommodate peak waterfowl populations, moving of high voltage power transmission towers, and maintaining agricultural and hunting interests. This project involved recreating of open water areas, marsh habitat, mud flat habitat, saline meadow habitat, maintaining two existing wetlands in the area of the new wetlands without disturbing them, and improving upland habitat surrounding the new wetlands.