WorldWideScience

Sample records for cber licensed products

  1. Center for Biologics Evaluation and Research (CBER)

    Data.gov (United States)

    Federal Laboratory Consortium — CBER is the Center within FDA that regulates biological products for human use under applicable federal laws, including the Public Health Service Act and the Federal...

  2. Application of CBERS-1 to monitoring of geological hazards in china

    Science.gov (United States)

    Qiao, Y.

    China is a country with a great variety of wide and frequent geological disasters which is the most serious natural disasters bring damage to national economical construction and people's life and property and causes an annual direct economic loss over 200 hundred million Chinese yuan to China. In recent 20 years great work has been done to apply remote sensing to investigation and monitoring earthquake, collapse, landslide, mud-rock flow, river-band cave-in, lava collapse, earth crevise, ground coal bunker spontaneous combustion, and great contribution has been done for the control. The successful launch and operation of the China-Brazil Resources Satellite& "CBERS -1" provides us an even more convenient tool. In present paper it introduces the applications of CBERS remote sensing in monitoring of large scale slide in Yigong Tibet and in Yangyuan Shanxi for earthquake calamities combined with meteorological remote sensing data. The results demonstrate that CBERS data could get in time and accurate geo-disasters monitoring information and show us the actual happenings which supply reliable basis for control and release measures to the disaster. CBERS has played an unique important role in fighting against the slide disaster and sending relief to the area and the resulted floods. It is bond to play an active role to promote growth of Chinese national economy. Keywords: CBERS; Geological Hazards; Monimonitoring

  3. Discriminação de variedades de citros em imagens CCD/CBERS-2 Discrimination of citrus varieties using CCD/CBERS-2 satellite imagery

    Directory of Open Access Journals (Sweden)

    Ieda Del'Arco Sanches

    2008-02-01

    Full Text Available O presente trabalho teve o objetivo de avaliar as imagens CCD/CBERS-2 quanto à possibilidade de discriminarem variedades de citros. A área de estudo localiza-se em Itirapina (SP e, para este estudo, foram utilizadas imagens CCD de três datas (30/05/2004, 16/08/2004 e 11/09/2004. Um modelo que integra os elementos componentes da cena citrícola sensoriada é proposto com o objetivo de explicar a variabilidade das respostas das parcelas de citros em imagens orbitais do tipo CCD/CBERS-2. Foram feitas classificações pelos algoritmos Isoseg e Maxver e, de acordo com o índice kappa, concluiu-se que é possível obterem-se exatidões qualificadas como muito boas, sendo que as melhores classificações foram conseguidas com imagens da estação seca.This paper was aimed at evaluating the possibility of discriminating citrus varieties in CCD imageries from CBERS-2 satellite ("China-Brazil Earth Resouces Satellite". The study area is located in Itirapina, São Paulo State. For this study, three CCD images from 2004 were acquired (May 30, August 16, and September 11. In order to acquire a better understanding and for explaining the variability of the spectral behavior of the citrus areas in orbital images (like as the CCD/CBERS-2 images a model that integrates the elements of the citrus scene is proposed and discussed. The images were classified by Isoseg and MaxVer classifiers. According to kappa index, it was possible to obtain classifications qualified as 'very good'. The best results were obtained with the images from the dry season.

  4. Next generation hyper resolution wide swath and multi-channel optical payload for CBERS series

    Science.gov (United States)

    Wang, Weigang

    2017-11-01

    The China-Brazilian Earth Resources Satellite (CBERS) program, (also called ZY-1) the result of a space technology agreement between China and Brazil, was officially signed in 1988 after the first joint work report produced by National Institute for Space Research (INPE) and the Chinese Academy of Space Technology (CAST). During the 26 years of its existence, the program of cooperation between China and Brazil in space has achieved the successful launch of three satellites. It has become a unique example of cooperation in cutting edge technology between emerging nations. CBERS satellite is the first generation data-transferring remote sensing satellite developed by China. CBERS satellite data are widely applied to crop yield estimation, exploration of land and resources, urban planning, environmental protection and monitoring, disaster reduction, and other fields. CBERS series is just like Landsat series of USA and SPOT series of France.

  5. CBERS-2B Brazilian remote sensing satellite to help to monitor the Bolivia-Brazil gas pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Hernandes, Gilberto Luis Sanches [TBG Transportadora Brasileira Gasoduto Bolivia-Brasil, Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper presents the results of CBERS-2B' Brazilian Remote Sensing Satellite to help to monitor the Bolivia-Brazil Gas Pipeline. The CBERS-2B is the third satellite launched in 2007 by the CBERS Program (China-Brazil Earth Resources Satellite) and the innovation was the HRC camera that produces high resolution images. It will be possible to obtain one complete coverage of the country every 130 days. In this study, 2 images from different parts of the Bolivia- Brazil Gas Pipeline were selected. Image processing involved the geometric registration of CBERS-2B satellite images with airborne images, contrast stretch transform and pseudo color. The analysis of satellite and airborne images in a GIS software to detect third party encroachment was effective to detect native vegetation removal, street construction, growth of urban areas, farming and residential/industrial land development. Very young, the CBERS-2B is a good promise to help to inspect the areas along the pipelines. (author)

  6. Exterior orientation of CBERS-2B imagery using multi-feature control and orbital data

    Science.gov (United States)

    Marcato Junior, J.; Tommaselli, A. M. G.

    2013-05-01

    The major contribution of this paper relates to the practical advantages of combining Ground Control Points (GCPs), Ground Control Lines (GCLs) and orbital data to estimate the exterior orientation parameters of images collected by CBERS-2B (China-Brazil Earth Resources Satellite) HRC (High-resolution Camera) and CCD (High-resolution CCD Camera) sensors. Although the CBERS-2B is no longer operational, its images are still being used in Brazil, and the next generations of the CBERS satellite will have sensors with similar technical features, which motivates the study presented in this paper. The mathematical models that relate the object and image spaces are based on collinearity (for points) and coplanarity (for lines) conditions. These models were created in an in-house developed software package called TMS (Triangulation with Multiple Sensors) with multi-feature control (GCPs and GCLs). Experiments on a block of four CBERS-2B HRC images and on one CBERS-2B CCD image were performed using both models. It was observed that the combination of GCPs and GCLs provided better bundle block adjustment results than conventional bundle adjustment using only GCPs. The results also demonstrate the advantages of using primarily orbital data when the number of control entities is reduced.

  7. Discussion on the fusing methods for HR and CCD images of CBERS

    International Nuclear Information System (INIS)

    Gao Zhangsheng; Zhao Yingjun

    2010-01-01

    CBERS-02B multi-spectral CCD data are different from HR panchromatic data in resolution, which causes difficulty in image fusion. With the method of Pansharping, HPF, Brovey transform, IHS transform, principal component transform, Gram Schmidt (GS) transform and wavelet transform, the authors have tested the fusion methods for CCD data and HR data of CBERS, and the fusion results are discussed and evaluated qualitatively and quantitatively. (authors)

  8. Deviations in CBERS-4 Satellite Direction Components From The Electromagnetic Disturbance of Communication Antennas

    Science.gov (United States)

    Heilmann, A.; Fernandes, C.

    2017-10-01

    The CBERS-4 is a low Earth orbit satellite, with a set of antennas S-band/UHF for communication almost omni-direcional. For the electromagnetic radiation from transmission antennas, was developed a model of electromagnetic disturbance considering the antennas theory and the laws of the conservation energy-momentum. Was propagated the orbit of the CBERS-4 satellite considering your state vector from the March 14, 2016, at 11h 14m 15.23s using the equation of motion in the form of cartesian components. From the state vector of the CBERS-4 satellite was possible to propagate the orbit for different periods, without disturbance (considering just the problem of two bodies) and with a disturbance of electromagnetic origin. The model of reaction of electromagnetic acceleration on the satellite depends on only the type of antenna. Quadrifilar and parabolic propeller antennas were considered in this paper. Using the equation of motion of the satellite based on the method of Runge-Kutta of fourth and fifth degree, the effect disturber this modeling was applied on the CBERS-4 considering the mass of satellite, characteristics of antenna, power irradiated and gain maximum of antenna. The final analysis discusses the values of components in the direction (radial, cross and normal) and the coordinates X-Y-Z considering the case disturbed to both antennas.

  9. Análise de mapas de represas publicados na web usando imagens orbitais CCD/CBERS no estado de Minas Gerais Analysis of dams maps published on the web by using orbital CCD/CBERS images in Minas Gerais State, Brazil

    Directory of Open Access Journals (Sweden)

    Elizabeth Ferreira

    2010-02-01

    Full Text Available Neste trabalho, bancos de dados públicos e gratuitos disponíveis na World Wide Web (WEB foram utilizados para avaliar as áreas das superfícies dos espelhos d'água das represas de Furnas e do Funil, no Estado de Minas Gerais. O objetivo foi comparar as informações obtidas nos bancos da WEB com os valores das áreas calculadas a partir de imagens do sensor CCD a bordo dos satélites CBERS2 e CBERS2B. A área da represa de Furnas obtida a partir das imagens CCD/CBERS2B, ano 2008, foi de 1.138 km², mas nos bancos de dados consultados esta área estava entre 1.182 e 1.503 km². A represa do Funil, construída em 2003, com superfície de espelho d'água de 29,37 km² e uma ilha com área de 1,93 km² não aparecem nos bancos Atlas, Geominas, IGAM e IBGE. Os resultados mostraram algumas discrepâncias nos bancos de dados publicados na WEB, tais como diferenças em áreas e supressão ou extrapolação de limites do espelho d'água. Concluiu-se que, até o momento, os responsáveis por algumas publicações de bancos de dados no Estado de Minas Gerais não tiveram rigor suficiente com as atualizações. As imagens CCD/CBERS, que também são dados públicos disponíveis na WEB, mostraram ser produtos adequados para verificar, atualizar e melhorar as informações publicadas.In this work some public databases from the World Wide Web (WEB were used to find the area of the Furnas and Funil Dams in Minas Gerais State. The purpose of this work was to compare the WEB public databases values and the real values obtained from the CCD camera images on board CBERS2 and CBERS2B satellites. The Furnas Dam area obtained from CCD/ CBERS2B images, in 2008, was 1.138 km², but in the consulted databases this area ranged from 1.182 to 1.503 km². The dam of the Funil, built in 2003, with a water surface of 29.37 km² and an island with 1.93 km² area, did not appear in Atlas, Geominas, IGAM and IBGE databases. The results revealed some problems in the WEB public

  10. Product Licenses Database Application

    CERN Document Server

    Tonkovikj, Petar

    2016-01-01

    The goal of this project is to organize and centralize the data about software tools available to CERN employees, as well as provide a system that would simplify the license management process by providing information about the available licenses and their expiry dates. The project development process is consisted of two steps: modeling the products (software tools), product licenses, legal agreements and other data related to these entities in a relational database and developing the front-end user interface so that the user can interact with the database. The result is an ASP.NET MVC web application with interactive views for displaying and managing the data in the underlying database.

  11. 21 CFR 610.53 - Dating periods for licensed biological products.

    Science.gov (United States)

    2010-04-01

    ... hours from date of collection, provided labeling recommends storage between 1 and 6 °C. Yellow Fever... Research (CBER). Pneumococcal Vaccine Polyvalent: 1. Final bulk powder ......do 24 months after potency... Evaluation and Research or the Director of the Center for Drug Evaluation and Research. [50 FR 4134, Jan. 29...

  12. MELHORIA DO PROCESSO DE CORREÇÃO GEOMÉTRICA DE IMAGENS CBERS-CCD PELO USO DE AMOSTRAS GEORREFERENCIADAS CLASSIFICADAS

    OpenAIRE

    Castejon, Emiliano Ferreira; Fonseca, Leila Maria Garcia; Forster, Carlos Henrique Quartucci

    2015-01-01

    As imagens da série de satélites CBERS são distribuídas gratuitamente, mas para que seja possível utilizá-las, é necessário aplicar um método de correção geométrica. É proposta uma melhoria do processo de correção automática de forma a selecionar as melhores amostras de referência a partir das quais é possível definir pontos de controle usados para o cálculo dos parâmetros do modelo usado na correção. Para demonstrar a eficácia, o método proposto é aplicado em um conjunto de imagens CBERS usa...

  13. 75 FR 4081 - Agency Information Collection Activities; Proposed Collection; Comment Request; General Licensing...

    Science.gov (United States)

    2010-01-26

    ... any changes, in the product, production process, quality controls, equipment, facilities, or... from studies in animals). Section 601.93 provides that biological products approved under subpart H are... an Antibiotic Drug for Human Use'' to harmonize application procedures between CBER and CDER. The...

  14. Technology Licensing Strategy for Network Product in a Service Industry

    Directory of Open Access Journals (Sweden)

    Xianpei Hong

    2015-01-01

    Full Text Available Technology licensing has gained significant attention in literature and practice as a rapid and effective way to improve firm’s capability of technology innovation. In this paper, we investigate a duopolistic service provider competition market, where service providers develop and sell a kind of network product. In this setting, we analyze the innovating service provider’s four licensing strategies: no licensing, fixed fee licensing, royalty licensing, and two-part tariff licensing. The literature suggests that when the network products can be completely substituted, two-part tariff licensing is the optimal strategy of the innovating service provider. We find that when the network products cannot be completely substituted, two-part tariff licensing is not always optimal. The degree of the product differentiation, the intensity of the network effects, and the R&D cost of the potential licensee play a key role in determining the innovating service provider’s optimal licensing strategies.

  15. 9 CFR 102.5 - U.S. Veterinary Biological Product License.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false U.S. Veterinary Biological Product... BIOLOGICAL PRODUCTS § 102.5 U.S. Veterinary Biological Product License. (a) Authorization to produce each biological product shall be specified on a U.S. Veterinary Biological Product License, issued by the...

  16. 21 CFR 310.4 - Biologics; products subject to license control.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Biologics; products subject to license control... to license control. (a) If a drug has an approved license under section 351 of the Public Health.... (b) To obtain marketing approval for radioactive biological products for human use, as defined in...

  17. 75 FR 33312 - Indexing Structured Product Labeling for Human Prescription Drug and Biological Products; Request...

    Science.gov (United States)

    2010-06-11

    ...] Indexing Structured Product Labeling for Human Prescription Drug and Biological Products; Request for... Biologics Evaluation and Research (CBER) are indexing certain categories of information in product labeling for use as terms to search repositories of approved prescription medical product structured product...

  18. Orientação de imagens CBERS-2B usando o modelo rigoroso de colinearidade com dados orbitais

    Directory of Open Access Journals (Sweden)

    José Marcato Junior

    Full Text Available Atualmente, o imageamento orbital é uma das principais técnicas de coleta de informações geoespaciais. Embora os sistemas orbitais sejam equipados com sensores de orientação direta (GNSS, giroscópios, sensores de estrelas, dentre outros, nem sempre as imagens corrigidas a partir dos dados (efemérides e atitude provenientes destes sensores apresentam a acurácia requerida para certas aplicações. Uma das alternativas para solucionar este problema é a orientação dessas imagens considerando as informações de órbita (efemérides e atitude com o uso adicional de pontos de apoio. O objetivo principal deste trabalho consiste em avaliar experimentalmente o modelo de colinearidade com dados orbitais no processo de orientação de imagens CBERS-2B. Este modelo foi implementado no programa TMS (Triangulação MultiSsensor, seguindo a abordagem de triangulação multissensor. Foram realizados experimentos com imagens do nível 1 (com apenas correção radiométrica coletadas pelos sensores CCD e HRC. Nos casos estudados verificou-se que a utilização das informações de órbita possibilita a orientação de imagens CBERS-2B com um número reduzido de pontos de apoio.

  19. Identifying Spatial Units of Human Occupation in the Brazilian Amazon Using Landsat and CBERS Multi-Resolution Imagery

    Directory of Open Access Journals (Sweden)

    Maria Isabel Sobral Escada

    2012-01-01

    Full Text Available Every spatial unit of human occupation is part of a network structuring an extensive process of urbanization in the Amazon territory. Multi-resolution remote sensing data were used to identify and map human presence and activities in the Sustainable Forest District of Cuiabá-Santarém highway (BR-163, west of Pará, Brazil. The limits of spatial units of human occupation were mapped based on digital classification of Landsat-TM5 (Thematic Mapper 5 image (30m spatial resolution. High-spatial-resolution CBERS-HRC (China-Brazil Earth Resources Satellite-High-Resolution Camera images (5 m merged with CBERS-CCD (Charge Coupled Device images (20 m were used to map spatial arrangements inside each populated unit, describing intra-urban characteristics. Fieldwork data validated and refined the classification maps that supported the categorization of the units. A total of 133 spatial units were individualized, comprising population centers as municipal seats, villages and communities, and units of human activities, such as sawmills, farmhouses, landing strips, etc. From the high-resolution analysis, 32 population centers were grouped in four categories, described according to their level of urbanization and spatial organization as: structured, recent, established and dependent on connectivity. This multi-resolution approach provided spatial information about the urbanization process and organization of the territory. It may be extended into other areas or be further used to devise a monitoring system, contributing to the discussion of public policy priorities for sustainable development in the Amazon.

  20. Pharmaceutical new product development: the increasing role of in-licensing.

    Science.gov (United States)

    Edwards, Nancy V

    2008-12-01

    Many pharmaceutical companies are facing a pipeline gap because of the increasing economic burden and uncertainty associated with internal research and development programs designed to develop new pharmaceutical products. To fill this pipeline gap, pharmaceutical companies are increasingly relying on in-licensing opportunities. New business development identifies new pharmaceuticals that satisfy unmet needs and are a good strategic fit for the company, completes valuation models and forecasts, evaluates the ability of the company to develop and launch products, and pursues in-licensing agreements for pharmaceuticals that cannot be developed internally on a timely basis. These agreements involve the transfer of access rights for patents, trademarks, or similar intellectual property from an outside company in exchange for payments. Despite the risks, in-licensing is increasingly becoming the preferred method for pharmaceutical companies with pipeline gaps to bring new pharmaceuticals to the clinician.

  1. 78 FR 49528 - Consolidation of Wound Care Products Containing Live Cells

    Science.gov (United States)

    2013-08-14

    ...] Consolidation of Wound Care Products Containing Live Cells AGENCY: Food and Drug Administration, HHS. ACTION... certain wound care products containing live cells from the Center for Devices and Radiological Health... CDRH and CBER. FDA believes that as more wound care products containing live cells are developed such...

  2. To License or Not to License Remanufacturing Business?

    Directory of Open Access Journals (Sweden)

    Zu-Jun Ma

    2018-01-01

    Full Text Available Many original equipment manufacturers (OEMs face the choice of whether to license an independent remanufacturer (IR to remanufacture their used products. In this paper, we develop closed-loop supply chain models with licensed and unlicensed remanufacturing operations to analyze the competition and cooperation between an OEM and an IR. The OEM sells new products and collects used products through trade-ins, while the IR intercepts the OEM’s cores to produce remanufactured products and sell them in the same market. We derive optimal decisions for each of the two types of firms in licensed and unlicensed remanufacturing scenarios and identify conditions under which the OEM and the IR would be most likely to cooperate with each other in implementing remanufacturing. The results show although it is beneficial for an OEM to license an IR to remanufacture its cores, it is not always necessary for an IR to accept OEM’s authorization. Moreover, we contrast the result for licensed remanufacturing scenario in the decentralized system with that in the centrally coordinated system to quantify potential inefficiency resulting from decentralization of decision making.

  3. Fracking. The granting of production licenses and licenses for exploratory drilling for natural gas production from nonconventional deposits; Fracking. Zur Erteilung von Gewinnungsberechtigungen und der Zulassung von Probebohrungen zur Gewinnung von Erdgas aus unkonventionellen Lagerstaetten

    Energy Technology Data Exchange (ETDEWEB)

    Attendorn, Thorsten [Fachhochschule fuer oeffentliche Verwaltung (FHoeV) NRW, Dortmund (Germany)

    2012-07-01

    Nonconventional gas production by fracking is already widely used in the USA. Various organizations, from big players to small and medium-sized domestic organizations, have applied for licenses for exploratory drilling, e.g. in Niedersachsen and Nordrhein-Westfalen. At the same time, widespread resistance by the local population in these regions has been raised by environmentalists, political groups and even the church. The contribution outlines the legal regulations governing fracking, with the focus on production licenses and licenses for exploratory drilling.

  4. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Rønde, Thomas; Fosfuri, Andrea

    the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend upon product market performance. If licensing is decentralized, the business unit forgoes valuable...... licensing opportunities since the rewards for licensing are (optimally) weaker than those for product market profits. This distortion is stronger when production-based incentives are more powerful, making centralization more attractive. Growth of technology markets favors centralization and drives higher...

  5. Understanding Licensing Behavior

    DEFF Research Database (Denmark)

    Cabaleiro, Goretti; Moreira, Solon; Reichstein, Toke

    The potential for rent dissipation has been argued to be the main cause of firms? licensing out behavior being stifled.However, this aspect has been scarcely studied empirically. We draw on rent dissipation arguments, and hypothesize that firms suffering from the not-invented-here (NIH) syndrome......, firms in competitive product markets, and firms that have incurred substantial sunk cost are associated with lower rates of technology out-licensing. We also posit that sunk costs negatively moderate the relationship between competition in the licensor?s product market, and licensing rate. We test our...

  6. 77 FR 21592 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2012-04-10

    ... Licensing of Non-Power Reactors: Format and Content,'' for the production of radioisotopes and NUREG-1537, Part 2, ``Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors... by searching on http://www.regulations.gov under Docket ID NRC-2011-0135. You may submit comments by...

  7. FOSS License Selection and Code Management

    OpenAIRE

    Vescuso, Peter

    2011-01-01

    With nearly 2,000 free and open source software (FLOSS) licenses, software license proliferation¿ can be a major headache for software development organizations trying to speed development through software component reuse, as well as companies redistributing software packages as components of their products. Scope is one problem: from the Free Beer license to the GPL family of licenses to platform-specific licenses such as Apache and Eclipse, the number and variety of licenses make it difficu...

  8. Caracterização espectral de áreas de gramíneas forrageiras infectadas com a doença "mela-das-sementes da braquiária" por meio de imagens CCD/CBERS-2 Spectral characterization of forage grasses infected with the disease "mela-das-sementes da braquiária" through CCD/CDBERS -2 images

    Directory of Open Access Journals (Sweden)

    José C. Rosatti

    2006-12-01

    Full Text Available Imagens CCD/CBERS-2, nas bandas espectrais CCD2, CCD3 e CCD4, dos anos de 2004 e 2005, de Mirante do Paranapanema - SP, foram transformadas em reflectância de superfície usando o modelo 5S de correção atmosférica e normalizadas radiometricamente. O objetivo principal foi caracterizar espectralmente áreas de pastagens de Brachiaria brizantha em fase de florescimento, isentas e infectadas com a doença "mela-das-sementes da braquiária", possibilitando a sua detecção por meio da comparação entre os valores de reflectância de superfície denominada de Fator de Reflectância Bidirecional de Superfície (FRBS. Teve-se, também, o objetivo de avaliar a eficácia das imagens CCD/CBERS-2 para a obtenção de respostas espectrais de pastagens. Os dosséis sadios e doentes da Brachiaria brizantha foram identificados por meio da análise dos valores de reflectância e dos dados observados no Índice de Estresse Hídrico Acumulativo Relativo da Cultura (ACWSI obtidos na área de estudo. Os resultados indicaram que as principais diferenças foram a diminuição da reflectância na banda CCD3 e o aumento da reflectância na banda CCD4 nas áreas doentes. A metodologia empregada com o uso de dados do sensor CCD/CBERS-2, associados ao ACWSI, mostrou-se eficaz para discriminar dosséis infectados com a "mela-das-sementes da braquiária".CCD/CBERS-2 images in the spectral bands of CCD2, CCD3 and CCD4 of the years 2004 and 2005, from Mirante do Paranapanema - SP (Brazil, were transformed into surface reflectance images using the 5S atmospheric correction model and radiometrically normalized. The main objective was to spectrally characterize pastures of Brachiaria brizantha in the flowering phase, exempt and infected with the disease "mela-das-sementes da braquiária" making it possible its detection through the comparison among the SBRF - Surface Bidirectional Reflectance Factor values. At the same time, it was aimed to evaluate the effectiveness of the

  9. 27 CFR 555.45 - Original license or permit.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license or permit. 555.45 Section 555.45 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS... Original license or permit. (a) Licenses issued prior to May 24, 2003. Any person who intends to engage in...

  10. 27 CFR 478.44 - Original license.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license. 478.44 Section 478.44 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS, AND....44 Original license. (a)(1) Any person who intends to engage in business as a firearms or ammunition...

  11. Flexible licensing

    Directory of Open Access Journals (Sweden)

    Martyn Jansen

    2012-07-01

    Full Text Available The case is presented for a more flexible approach to licensing online library resources. Today's distributed education environment creates pressure for UK higher and further education institutions (HEI/FEIs to form partnerships and to develop educational products and roll them out across the globe. Online library resources are a key component of distributed education and yet existing licensing agreements struggle to keep pace with the increasing range of users and purposes for which they are required. This article describes the process of developing a flexible approach to licensing and proposes a new model licence for online library resources which has the adaptability needed in this new global educational landscape. These ideas have been presented and discussed at various workshops across Eduserv's and JISC Collections' higher education and publisher communities, and further consultation is ongoing.

  12. 76 FR 63668 - Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes

    Science.gov (United States)

    2011-10-13

    ..., Research and Test Reactors Projects Branch, Division of Policy and Rulemaking, Office of Nuclear Reactor... NUCLEAR REGULATORY COMMISSION [NRC-2011-0135] Guidelines for Preparing and Reviewing Licensing Applications for the Production of Radioisotopes AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim...

  13. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994......This paper investigates the matching of firms on the market for technology. The paper forwards two dimensions along which license formation occurs: technology and product-market. Both sides of the market search for a partner representing potential for high technology synergies to maximize licensing...

  14. Assessing the Relative Ecological Importance and Deforestation Risks of Unprotected Areas in Western Brazil Using Landsat, CBERS and Quantum GIS

    Science.gov (United States)

    Smith, A.; Sevilla, C.; Lanclos, A.; Carson, C.; Larson, J.; Sankaran, M.; Saad, M.

    2012-12-01

    In addition to understanding Brazilian policies and currently utilized methodologies, the measurement of the impacts of deforestation is essential for enhancing techniques to reduce deforestation in the future. Adverse impacts of deforestation include biodiversity loss, increased carbon dioxide emissions, and a reduced rate of evapotranspiration, all of which contribute directly or indirectly to global warming. With the continual growth in population in developing countries such as Brazil, increased demands are placed on infrastructural development and food production. As a result, forested areas are cleared for agricultural production. Recently, exploration for hydrocarbons in Western Brazil has also intensified as a means to stimulate the economy, as abundant oil and gas is believed to be found in these regions. Unfortunately, hydrocarbon-rich regions of Western Brazil are also home to thousands of species. Many of these regions are as of yet untapped but are at risk of ecological disruption as a result of impending human activity. This project utilized Landsat 5 TM to monitor deforestation in a subsection of the Brazilian states of Rondônia and Amazonas. A risk map identifying areas susceptible to future deforestation, based on factors such as proximity to roads, bodies of water, cities, and proposed hydrocarbon activities such as pipeline construction, was created. Areas at higher risk of clearance were recommended to be a target for enhanced monitoring and law enforcement. In addition, an importance map was created based on biodiversity and location of endangered species. This map was used to identify potential areas for future protection. A Chinese-Brazilian satellite, CBERS 2B CCD was also utilized for comparison. The NDVI model was additionally replicated in Quantum GIS, an open source software, so that local communities and policymakers could benefit without having to pay for expensive ArcGIS software. The capabilities of VIIRS were also investigated to

  15. 10 CFR 32.22 - Self-luminous products containing tritium, krypton-85 or promethium-147: Requirements for license...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Self-luminous products containing tritium, krypton-85 or... containing tritium, krypton-85 or promethium-147: Requirements for license to manufacture, process, produce... self-luminous products containing tritium, krypton-85, or promethium-147, or to initially transfer such...

  16. The Brazilian wide field imaging camera (WFI) for the China/Brazil earth resources satellite: CBERS 3 and 4

    Science.gov (United States)

    Scaduto, L. C. N.; Carvalho, E. G.; Modugno, R. G.; Cartolano, R.; Evangelista, S. H.; Segoria, D.; Santos, A. G.; Stefani, M. A.; Castro Neto, J. C.

    2017-11-01

    The purpose of this paper is to present the optical system developed for the Wide Field imaging Camera - WFI that will be integrated to the CBERS 3 and 4 satellites (China Brazil Earth resources Satellite). This camera will be used for remote sensing of the Earth and it is aimed to work at an altitude of 778 km. The optical system is designed for four spectral bands covering the range of wavelengths from blue to near infrared and its field of view is +/-28.63°, which covers 866 km, with a ground resolution of 64 m at nadir. WFI has been developed through a consortium formed by Opto Electrônica S. A. and Equatorial Sistemas. In particular, we will present the optical analysis based on the Modulation Transfer Function (MTF) obtained during the Engineering Model phase (EM) and the optical tests performed to evaluate the requirements. Measurements of the optical system MTF have been performed using an interferometer at the wavelength of 632.8nm and global MTF tests (including the CCD and signal processing electronic) have been performed by using a collimator with a slit target. The obtained results showed that the performance of the optical system meets the requirements of project.

  17. 9 CFR 102.4 - U.S. Veterinary Biologics Establishment License.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false U.S. Veterinary Biologics... LICENSES FOR BIOLOGICAL PRODUCTS § 102.4 U.S. Veterinary Biologics Establishment License. (a) Before a U.S. Veterinary Biologics Establishment License will be issued by the Administrator for any establishment, an...

  18. 21 CFR 515.10 - Medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Medicated feed mill license applications. 515.10... (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.10 Medicated feed mill license applications. (a) Medicated feed mill license applications (Forms FDA 3448) may...

  19. 76 FR 79203 - Prospective Grant of Exclusive License: Veterinary Biological Products for Swine Influenza Vaccines

    Science.gov (United States)

    2011-12-21

    ... Exclusive License: Veterinary Biological Products for Swine Influenza Vaccines AGENCY: National Institutes....7. The invention relates to compositions and methods of use as Veterinary Influenza Vaccines... to humans. This technology describes DNA vaccines against influenza serotypes H5N1, H1N1, H3N2, and...

  20. Managing Licensing in a Market for Technology

    DEFF Research Database (Denmark)

    Arora, Ashish; Fosfuri, Andrea; Rønde, Thomas

    2013-01-01

    , we find that interdependency across business units may result in more, not less, decentralization. Furthermore, even though centralization results in less information, centralized licensing deals are larger. Our model conforms to the existing evidence that reports heterogeneity across firms in both......Technology licensing is an important means for companies to extract more value from their intellectual assets. We build a model that helps understand how licensing activity should be organized within large corporations. More specifically, we compare decentralization—where the business unit using...... the technology makes licensing decisions—to centralized licensing. The business unit has superior information about licensing opportunities but may not have the appropriate incentives because its rewards depend on product market performance. If licensing is decentralized, the business unit forgoes valuable...

  1. Whom to Choose as License Partner?

    DEFF Research Database (Denmark)

    Laursen, Keld; Reichstein, Toke; Trombini, Giulia

    2013-01-01

    benefits and obviate issues related to technology transfer and knowledge recombination. At the same time, firms wish to select a partner operating in a different product market to minimize competitive downside issues and to access other product markets, skills and resources. We contend interdependence...... between technology and market forces: if partners are market distant, the likelihood of technology license contractual partnership decreases with partners’ technological distance. Using data on the formation of license partnerships in the global biopharmaceutical industry over the period 1994...

  2. DOE Patents Available for Licensing

    International Nuclear Information System (INIS)

    Stuber, C.

    1981-01-01

    DOE Patents Available for Licensing (DOE PAL) provides abstracting and indexing coverage of the DOE patent literature, including patent applications, that concerns any apsect of energy production, conservation, and utilization. The citations are arranged by subject category. DOE is prepared to grant exclusive or nonexclusive, revocable licenses under DOE-owned US patents and patent applications in accordance with the provisions of 10CFR781

  3. Freely Licensed and Open Source Pipelines for Art Based Film and Media Production

    Directory of Open Access Journals (Sweden)

    Anthony Whitehead

    2009-08-01

    Full Text Available Given the number of free/libre and open source licensed tools, and the number of "no cost" applications at the fingertips of the artist/animator/film developer today, the ability to "create what you will" is now an option for everyone. The advent of affordable media development tools has opened up the world of media production to those who were previously locked out of the Hollywood studio system. Proprietary software including Adobe Creative Suite, Autodesk?s Maya, Nuke, After Effects, Final Draft, and a litany of other necessary tools creates a financial wall so high that ?will? cannot overcome it alone. In this article, we examine a standard pipeline from a birds-eye-view for anyone with a will to create an Indie film. Without breaking the bank, the entire pipeline is achievable using F/LOSS tools and content that is available under a creative commons license. This allows high quality media development for all. In many cases, these same tools are being used by the Hollywood elite.

  4. 21 CFR 515.20 - Approval of medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Approval of medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.20 Approval of medicated feed mill license applications. Within 90 days after an...

  5. 21 CFR 515.23 - Voluntary revocation of medicated feed mill license.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Voluntary revocation of medicated feed mill... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.23 Voluntary revocation of medicated feed mill license. A license issued under...

  6. Challenges of SMR licensing practices

    Energy Technology Data Exchange (ETDEWEB)

    Soderholm, K., E-mail: kristiina.soderholm@fortum.com [Fortum Power, Espoo (Finland)

    2012-12-15

    This paper aims to increase the understanding of high level Nuclear Power Plant (NPP) licensing processes in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their different licensing processes and recent actions in new NPP construction. After discussing their similarities and differences, suitable features for Small Modular Reactor licensing can be emphasized and suggested. Some of the studied licensing processes have elements that are already quite well suited for application to SMRs, but all of these different national processes can benefit from studying and implementing lessons learned from SMR specific licensing needs. The main SMR features to take into account in licensing are standardization of the design, modularity, mass production and serial construction. Modularity can be divided into two different categories: the first category is simply a single unit facility constructed of independently engineered modules (e.g., construction process for Westinghouse AP-1000 NPP) and the second is a facility structure composed of many reactor modules where modules are manufactured in factories and installed into the facility as needed (e.g., NuScale Power SMR design). Short construction schedules will not be fully benefited from if the long licensing process prolongs the commissioning and approach to full-power operation. The focus area of this study is to better understand the possibility of SMR deployment in small nuclear countries, such as Finland, which currently has four operating NPPs. The licensing process needs to be simple and clear to make SMR deployment feasible from an economical point of view. This paper uses public information and interviews with experts to establish the overview of the different licensing processes and their main steps. A high-level comparison of the licensing steps has been carried out. Certain aspects of the aviation industry licensing process have also been studied and certain

  7. 21 CFR 515.11 - Supplemental medicated feed mill license applications.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Supplemental medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Applications § 515.11 Supplemental medicated feed mill license applications. (a) After approval of a medicated feed...

  8. NRC licensing of uranium enrichment plants

    International Nuclear Information System (INIS)

    Moran, B.W.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) is preparing a rule making that establishes the licensing requirements for low-enriched uranium enrichment plants. Although implementation of this rule making is timed to correspond with receipt of a license application for the Louisiana Energy Services centrifuge enrichment plant, the rule making is applicable to all uranium enrichment technologies. If ownership of the US gaseous diffusion plants and/or atomic vapor laser isotope separation is transferred to a private or government corporation, these plants also would be licensable under the new rule making. The Safeguards Studies Department was tasked by the NRC to provide technical assistance in support of the rule making and guidance preparation process. The initial and primary effort of this task involved the characterization of the potential safeguards concerns associated with a commercial enrichment plant, and the licensing issues associated with these concerns. The primary safeguards considerations were identified as detection of the loss of special nuclear material, detection of unauthorized production of material of low strategic significance, and detection of production of uranium enriched to >10% 235 U. The primary safeguards concerns identified were (1) large absolute limit of error associated with the material balance closing, (2) the inability to shutdown some technologies to perform a cleanout inventory of the process system, and (3) the flexibility of some technologies to produce higher enrichments. Unauthorized production scenarios were identified for some technologies that could prevent conventional material control and accounting programs from detecting the production and removal of 5 kg 235 U as highly enriched uranium. Safeguards techniques were identified to mitigate these concerns

  9. Licensed bases management for advanced nuclear plants

    International Nuclear Information System (INIS)

    O'Connell, J.; Rumble, E.; Rodwell, E.

    2001-01-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  10. Licensed bases management for advanced nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, J [Duke Engineering and Services, Marlborough, MA (United States); Rumble, E; Rodwell, E [EPRI, Palo Alto, CA (United States)

    2001-07-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  11. Licensed bases management for advanced nuclear plants

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, J. [Duke Engineering and Services, Marlborough, MA (United States); Rumble, E.; Rodwell, E. [EPRI, Palo Alto, CA (United States)

    2001-07-01

    Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its life cycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This paper describes the demonstration of a ''twin-engine'' approach that integrates a program from the emerging class of concept searching tools with a modern Product Data Management System (PDMS) to enhance the management of LB information for an example ANP design. (author)

  12. ITER licensing

    International Nuclear Information System (INIS)

    Gordon, C.W.

    2005-01-01

    ITER was fortunate to have four countries interested in ITER siting to the point where licensing discussions were initiated. This experience uncovered the challenges of licensing a first of a kind, fusion machine under different licensing regimes and helped prepare the way for the site specific licensing process. These initial steps in licensing ITER have allowed for refining the safety case and provide confidence that the design and safety approach will be licensable. With site-specific licensing underway, the necessary regulatory submissions have been defined and are well on the way to being completed. Of course, there is still work to be done and details to be sorted out. However, the informal international discussions to bring both the proponent and regulatory authority up to a common level of understanding have laid the foundation for a licensing process that should proceed smoothly. This paper provides observations from the perspective of the International Team. (author)

  13. 27 CFR 478.100 - Conduct of business away from licensed premises.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Conduct of business away from licensed premises. 478.100 Section 478.100 Alcohol, Tobacco Products, and Firearms BUREAU OF... FIREARMS AND AMMUNITION Conduct of Business § 478.100 Conduct of business away from licensed premises. (a...

  14. Current status of the PBMR licensing project

    International Nuclear Information System (INIS)

    Mysen, A.; Clapisson, G.A.; Metcalf, P.E.

    2000-01-01

    The CNS is currently reviewing the PBMR conceptual design from a licensibility point of view. The PBMR concept is based on a High Temperature Gas Cooled Reactor - pebble bed reactor type. It is anticipated that the PBMR design will rely on inherent safety characteristics to contain fission products within fuel over the full range of design basis events. This feature combined with the high temperature integrity of the fuel and structural graphite, allows the safe use of a high coolant temperature, which allows consideration of the future development of this reactor for non-electrical applications of nuclear heat for industrial use. The CNS licensing approach requires that the licensing and design basis of the plant should respect prevailing international norms and practices and that a quantitative risk assessment should demonstrate compliance with the CNS fundamental safety standards. The first stage of the licensing process is now ongoing; this is a pre-application phase, which will result in a statement on licensibility being issued. Identification of the specific documentation requirements and information needed is required across every step of the licensing process. Top level regulatory requirements have been established for the PBMR. They include the CNS fundamental safety standard and basic licensing criteria, which describes requirements on licensees of nuclear installations regarding risk assessment and compliance with the safety criteria and define classification of licensing basis events. (author)

  15. The case against a smoker's license.

    Directory of Open Access Journals (Sweden)

    Jeff Collin

    Full Text Available Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  16. The case for a smoker's license.

    Directory of Open Access Journals (Sweden)

    Simon Chapman

    Full Text Available BACKGROUND TO THE DEBATE: Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  17. The case for a smoker's license.

    Science.gov (United States)

    Chapman, Simon

    2012-01-01

    Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  18. The case against a smoker's license.

    Science.gov (United States)

    Collin, Jeff

    2012-01-01

    Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers designed to limit access to tobacco products and encourage cessation. Key elements of the smoker's license include smokers setting daily limits, financial incentives for permanent license surrender, and a test of health risk knowledge for commencing smokers. Collin argues against the proposal, saying that it would shift focus away from the real vector of the epidemic--the tobacco industry--and that by focusing on individuals it would censure victims, increase stigmatization of smokers, and marginalize the poor.

  19. 21 CFR 515.21 - Refusal to approve a medicated feed mill license application.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Refusal to approve a medicated feed mill license... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.21 Refusal to approve a medicated feed mill license application. (a) The...

  20. 21 CFR 515.24 - Notice of revocation of a medicated feed mill license.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 6 2010-04-01 2010-04-01 false Notice of revocation of a medicated feed mill... SERVICES (CONTINUED) ANIMAL DRUGS, FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.24 Notice of revocation of a medicated feed mill license. When a license...

  1. License renewal - an idea whose time has come. Hatch nuclear plant license renewal program: an actual example of application of the license renewal rule to the Intake Structure

    International Nuclear Information System (INIS)

    Chandiwala, F.; Evans, W.P.

    1999-01-01

    After the NRC issued a revised license renewal rule in May 1995, the nuclear industry focussed on developing generic industry for implementing the rule and testing the guidance through various demonstration programs and work products in conjunction with the NRC. In addition, plant-specific programs also proceeded forward. These activities show that implementation issues continue to exist. Since the issuance of the rule, the NRC has issued a draft standard review plan for license renewal (SRP-LR), working draft, September 1997. Southern Nuclear Operating Company (SNC) has begun development work on a license renewal application for Plant Hatch Units 1 and 2. Plant Hatch Units 1 and 2 are BWR 4, Mark I plants whose operating licenses expire in 2014 and 2018, respectively. The Plant Hatch initiative also involves teaming with other boiling water reactors (BWRs) to develop the license renewal technology within the BWR fleet, and to support Plant Hatch by providing an oversight role for the application process. The teaming effort involved two other utilities, each being assigned to prepare a common report on a mechanical system or a structure. The common report could be presented to the NRC with modifications to suit the individual plants, thereby saving time and money, and hopefully resulting in quicker approval by the NRC. The desired license renewal process end result is a renewed license with up to a 20 year extension (10CFR 54.31(b)). (orig.)

  2. Partner Selection in Technological Licensing Agreements

    DEFF Research Database (Denmark)

    Laursen, Keld; Trombini, Giulia

    This paper investigates the matching of seller and buyer firms in the market for technology licensing. By combining organizational learning theory with the industrial organization approach, we propose a matching model in which technological similarities in terms of relatedness and familiarity work...... that is technologically unrelated, ex ante familiarity with the licensors’ technology is required. We contend also that there is interdependence between technological learning and market competition: if partners are in the same product markets, the likelihood of technology license contractual partnerships decreases...

  3. U.S. licensing process and ABWR certification

    International Nuclear Information System (INIS)

    Quirk, J.F.; Williams, W.A.

    1996-01-01

    Part 50 of Title 10 of the Code of Federal Regulation (CFR) establishes a two-step licensing process by which the U.S. Nuclear Regulatory Committee (NRC) authorizes nuclear reactor plant construction through issuance of a construction permit and authorizes operation by issuance of an operating license. At each stage, the NRC Staff conducts technical reviews and there is potential for public hearings. In 1989, the NRC issued a new, simplified licensing process: Part 52. The purpose of the Part 52 licensing process is to provide a regulatory framework that brings about earlier resolution of licensing issues. Because issues are not resolved early in the Part 50 licensing process, approval of an operating license is not assured until after a significant investment has been made in the plant. Part 52 increases the stability and certainty of the licensing process by providing for the early resolution of safety and environmental issues. The Part 52 licensing process features (1) early site permits, (2) design certification, and (3) combined construction permit and operating licenses. As part of the U.S. Advanced Light Water Reactor (ALWR) Program to revitalize the nuclear option through the integration of government/utility/industry efforts, GE undertook the role of applying for certification for its latest product line, the Advanced Boiling Water Reactor (ABWR), under the U.S. ABWR certification program. The ABWR design is an essentially complete plant. Initial application for design certification was in 1987 under Part 50. GE reapplied in late 1991 under the newly promulgated Part 52. Following seven years of intensive interactions with the NRC and ACRS, GE was awarded the first Final Design Approval (FDA) under Part 52. The Commission initiated rulemaking by publishing the proposed ABWR Certification Rule in the Federal Register in early 1995. Certification is anticipated mid-1996. (J.P.N.)

  4. License renewal

    International Nuclear Information System (INIS)

    Newberry, S.

    1993-01-01

    This article gives an overview of the process of license renewal for nuclear power plants. It explains what is meant by license renewal, the significance of license renewal, and goes over key elements involved in the process of license renewal. Those key elements are NRC requirements embodied in 10 CFR Part 54 (Reactor Safety) and 10 CFR Part 51 (Environmental Issues). In addition Industry Reports must be developed and reviewed. License renewal is essentially the process of applying for a 20 year extension to the original 40 year operating license granted for the plant. This is a very long term process, which involves a lot of preparation, and compliance with regulatory rules and guidelines. In general it is a process which is expected to begin when plants reach an operating lifetime of 20 years. It has provisions for allowing the public to become involved in the review process

  5. Licensing Strategies of the Entreprising - But Vulnerable - `Intellectual property' Vendors

    DEFF Research Database (Denmark)

    Davis, Lee N.

    This paper investigates in an exploratory manner the licensing strategies pursued by firms whose business model is based on developing and licensing out their intellectual property rights (IPRs). These are not traditional suppliers, since they do not engage in production or commercialization...... be differentiated along two main dimensions: whether the driving force behind the inventive process is "technology push" or "market pull", and the degree to which the innovative activities carried out by the IP vendor are mutually dependent upon the innovative activities of the other relevant market players....... On this basis, four main licensing strategies are identified. We investigate the relative benefits and costs of these four strategies, and the factors affecting licensing choices.Key words: Intellectual property, licensing, strategyJEL Codes: O31, OO34...

  6. License renewal process

    International Nuclear Information System (INIS)

    Fable, D.; Prah, M.; Vrankic, K.; Lebegner, J.

    2004-01-01

    The purpose of this paper is to provide information about license renewal process, as defined by Nuclear Regulatory Commission (NRC). The Atomic Energy Act and NRC regulations limit commercial power reactor licenses to an initial 40 years but also permit such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations not on limitations of nuclear technology. Due to this selected time period; however, some structures and components may have been engineered on the basis of an expected 40-year service life. The NRC has established a timely license renewal process and clear requirements codified in 10 CFR Part 51 and 10 CFR Part 54, that are needed to assure safe plant operation for extended plant life. The timely renewal of licenses for an additional 20 years, where appropriate to renew them, may be important to ensuring an adequate energy supply during the first half of the 21st Century. License renewal rests on the determination that currently operating plants continue to maintain adequate levels of safety, and over the plant's life, this level has been enhanced through maintenance of the licensing bases, with appropriate adjustments to address new information from industry operating experience. Additionally, NRC activities have provided ongoing assurance that the licensing bases will continue to provide an acceptable level of safety. This paper provides additional discussion of license renewal costs, as one of key elements in evaluation of license renewal justifiability. Including structure of costs, approximately value and two different approaches, conservative and typical. Current status and position of Nuclear Power Plant Krsko, related to license renewal process, will be briefly presented in this paper. NPP Krsko is designed based on NRC Regulations, so requirements from 10 CFR 51, and 10 CFR 54, are applicable to NPP Krsko, as well. Finally, this paper will give an overview of current status of

  7. NUPLEX Licensing Subcommittee

    International Nuclear Information System (INIS)

    Edwards, D.W.; Allen, S.R.

    1988-01-01

    The NUPLEX Licensing Subcommittee was organized to seek a formal license renewal mechanism that institutionalizes the current licensing basis and consequent level of safety of a plant as the legitimate standard for acceptance and approval of an application for extended operation. Along with defining the most workable approach to and scope of review for license renewal, this paper explains the reasons why a regulatory framework is needed by the early 1990s. The initial results of development work on two key issues, licensing criteria and hearing process, are also presented. at this point six potential license renewal criteria have emerged: evaluation of existing monitoring/maintenance programs, revalidation of current licensing basis, conformance to special regulations, evaluation to a safety goal, plant performance history, and environmental assessment. The work on a hearing process has led to the development of two models for future consideration: hybrid legislative and hybrid adjudicatory

  8. Licensing of digital Instrumentation and Control in Radioisotope Production Facility

    International Nuclear Information System (INIS)

    Abdel-Aziz, L.Kh.; Lashin, R.; Mostafa, W.

    2012-01-01

    In spite of the rapid development of digital I and C systems in all major industries, it has for several reasons been slower in nuclear power plants. The most important reason is that only a few new plants have been ordered worldwide during the last ten years. A second reason is connected to the efforts needed in providing adequate evidence that the digital I and C system can be used in safety and safety related applications. This issue is connected to the effort needed in obtaining adequate assurance that the digital I and C will fulfill its intended function and contain no unintended function in all possible operational states during its entire life cycle. This paper presents an acceptance criteria for licensing a digital instrumentation and control system in a Radioisotope Production Facility(1), which is under commissioning. The acceptance criteria ensure that the I and C systems are designed to reach the highest degree of reliability with respect to the function they perform, operators will have clear and accessible availability to data on every plant parameter, and also ensure that the safety objectives have been covered

  9. 77 FR 71194 - Draft Guidance for Industry: Preclinical Assessment of Investigational Cellular and Gene Therapy...

    Science.gov (United States)

    2012-11-29

    ...] Draft Guidance for Industry: Preclinical Assessment of Investigational Cellular and Gene Therapy... Industry: Preclinical Assessment of Investigational Cellular and Gene Therapy Products,'' dated November... Evaluation (CBER), Office of Cellular, Tissue, and Gene Therapies (OCTGT). The product areas covered by this...

  10. Technology licensing in China

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason; Chen, Jin

    2015-01-01

    We explore the landscape of technology licensing among Chinese entities in the period 2000–12, using a unique database on technological licensing from the State Intellectual Property Office of China. We find that: first, among Chinese licensee organizations, firms have dominated in terms...... of the number of licensed technologies; second, the geographical distribution of licensed technologies among the provinces has gradually reached a new quantitative balance; third, utility models are the most popular technologies to be licensed and the majority of technology licensing in China has been between...... Chinese entities, and most transactions have been local within provinces; and finally, Chinese firms have gradually in-licensed newer and newer technologies, but the technologies in-licensed from foreign sources are by no means state-of-the-art. We make several suggestions for innovation policy...

  11. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Science.gov (United States)

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  12. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions

    Science.gov (United States)

    Ponzio, Todd A.; Feindt, Hans; Ferguson, Steven

    2011-01-01

    Summary Biopharmaceuticals are therapeutic products based on biotechnology. They are manufactured by or from living organisms and are the most complex of all commercial medicines to develop, manufacture and qualify for regulatory approval. In recent years biopharmaceuticals have rapidly increased in number and importance with over 4001 already marketed in the U.S. and European markets alone. Many companies throughout the world are now ramping up investments in biopharmaceutical R&D and expanding their portfolios through licensing of early-stage biotechnologies from universities and other non-profit research institutions, and there is an increasing number of license agreements for biopharmaceutical product development relative to traditional small molecule drug compounds. This trend will only continue as large numbers of biosimilars and biogenerics enter the market. A primary goal of technology transfer offices associated with publicly-funded, non-profit research institutions is to establish patent protection for inventions deemed to have commercial potential and license them for product development. Such licenses help stimulate economic development and job creation, bring a stream of royalty revenue to the institution and, hopefully, advance the public good or public health by bringing new and useful products to market. In the course of applying for such licenses, a commercial development plan is usually put forth by the license applicant. This plan indicates the path the applicant expects to follow to bring the licensed invention to market. In the case of small molecule drug compounds, there exists a widely-recognized series of clinical development steps, dictated by regulatory requirements, that must be met to bring a new drug to market, such as completion of preclinical toxicology, Phase 1, 2 and 3 testing and product approvals. These steps often become the milestone/benchmark schedule incorporated into license agreements which technology transfer offices use to

  13. License Compliance Issues For Biopharmaceuticals: Special Challenges For Negotiations Between Companies And Non-Profit Research Institutions.

    Science.gov (United States)

    Ponzio, Todd A; Feindt, Hans; Ferguson, Steven

    2011-09-01

    Biopharmaceuticals are therapeutic products based on biotechnology. They are manufactured by or from living organisms and are the most complex of all commercial medicines to develop, manufacture and qualify for regulatory approval. In recent years biopharmaceuticals have rapidly increased in number and importance with over 400() already marketed in the U.S. and European markets alone. Many companies throughout the world are now ramping up investments in biopharmaceutical R&D and expanding their portfolios through licensing of early-stage biotechnologies from universities and other non-profit research institutions, and there is an increasing number of license agreements for biopharmaceutical product development relative to traditional small molecule drug compounds. This trend will only continue as large numbers of biosimilars and biogenerics enter the market.A primary goal of technology transfer offices associated with publicly-funded, non-profit research institutions is to establish patent protection for inventions deemed to have commercial potential and license them for product development. Such licenses help stimulate economic development and job creation, bring a stream of royalty revenue to the institution and, hopefully, advance the public good or public health by bringing new and useful products to market. In the course of applying for such licenses, a commercial development plan is usually put forth by the license applicant. This plan indicates the path the applicant expects to follow to bring the licensed invention to market. In the case of small molecule drug compounds, there exists a widely-recognized series of clinical development steps, dictated by regulatory requirements, that must be met to bring a new drug to market, such as completion of preclinical toxicology, Phase 1, 2 and 3 testing and product approvals. These steps often become the milestone/benchmark schedule incorporated into license agreements which technology transfer offices use to monitor

  14. Licensing process in Finland

    International Nuclear Information System (INIS)

    Tiippana, Petteri

    2011-01-01

    In accordance with the Nuclear Energy Act, the use of nuclear energy constitutes operations subject to license. The licensing process and conditions for granting a license is defined in the legislation. The licenses are applied from and granted by the Government. This paper discusses briefly the licensing process in Finland and also the roles and responsibilities of main stakeholders in licensing. Licensing of a nuclear power plant in Finland has three steps. The first step is the Decision in Principle (DiP). Goal of DiP is to decide whether using nuclear power is for the overall good for the Finnish society. The second step is Construction License (CL) and the goal of CL phase is to determine whether the design of the proposed plant is safe and that the participating organisations are capable of constructing the plant to meet safety goals. The third step is the Operating License (OL) and the goal of the OL phase is to determine whether the plant operates safely and licensee is capable to operate the plant safely. Main stakeholders in the licensing process in Finland are the utility (licensee) interested in using nuclear power in Finland, Ministry of Employment and the Economy (MEE), Government, Parliament, STUK, the municipality siting the plant and the general public. Government grants all licenses, and Parliament has to ratify Government's Decision in Principle. STUK has to assess the safety of the license applications in each step and give statement to the Ministry. Municipality has to agree to site the plant. Both STUK and the municipality have a veto right in the licensing process

  15. 21 CFR 515.25 - Revocation of order refusing to approve a medicated feed mill license application or suspending...

    Science.gov (United States)

    2010-04-01

    ... medicated feed mill license application or suspending or revoking a license. 515.25 Section 515.25 Food and..., FEEDS, AND RELATED PRODUCTS MEDICATED FEED MILL LICENSE Administrative Actions on Licenses § 515.25 Revocation of order refusing to approve a medicated feed mill license application or suspending or revoking a...

  16. Brand management of licensed innovation X

    OpenAIRE

    Hämäläinen, Tommy

    2016-01-01

    European start-up company has patented a packaging innovation concept for a certain the food product. The manufacturing and productization of the innovation will be licensed internationally for several participants. The Case Company is therefore interested to know what kind of opportunities and requirements potentially simultaneous strategic partnerships with licensees would mean for the brand of the innovation in theory and practice. The purpose of this thesis was to evaluate the current...

  17. Libraries and licensing

    Directory of Open Access Journals (Sweden)

    Maja Žumer

    2001-01-01

    Full Text Available In the mid 90s, the abundance of various electronic publications exposed libraries to the problems of licensing electronic content. Various licensing principles have been prepared recently to help libraries in the process; it can be said that in general, the knowledge of licensing issues has improved in libraries of all types. Libraries form consortia in order to gain stronger negotiating positions and obtain better conditions.In the article, new licensing principles are presented in more detail, as well as some domestic and foreign experiences with consortia forming.

  18. Reactor licensing

    International Nuclear Information System (INIS)

    Harvie, J.D.

    2002-01-01

    This presentation discusses reactor licensing and includes the legislative basis for licensing, other relevant legislation , the purpose of the Nuclear Safety and Control Act, important regulations, regulatory document, policies, and standards. It also discusses the role of the CNSC, its mandate and safety philosophy

  19. Essays on the economics of licensing nuclear power plants

    International Nuclear Information System (INIS)

    Cohen, L.R.

    1979-01-01

    Regulation and licensing of nuclear power plants by the United States Atomic Energy Commission and the United States Nuclear Regulatory Commission are discussed. Chapter 1 overviews the licensing process and issues raised in licensing cases. Based on a sample of plants licensed between 1967 and 1978, a statistical study of the impact of public participation in licensing is performed. The study concludes that public participation has had a major impact on licensing and power-plant costs. The impact is due to a fundamental weakness of the Commissions: their inability to resolve certain issues related to acceptable social risk. The study has important policy implications for reforming the Federal licensing process. Chapter 2 contains an analysis of the Price-Anderson Act, a Federal program for compensating victims of large nuclear accidents. The Price-Anderson Act is placed within the context of generalized federal disaster relief. A model is developed that allows an evaluation programs on the basis of moral hazard and equity principles. Chapter 3 analyzes the Nuclear Regulatory Commission's treatment of its mandatory antitrust review of applicants for nuclear power plants. The main conclusion of the chapter is that the reviews have not addressed the central economic issues of antitrust that are relevant to nuclear power. Instead, the reviews contribute to further cartelization of the electric utility industry. While politically expedient, the reviews are counter-productive to the development of an optimal industry structure

  20. Aspects of the licensing procedures for enrichment reduction in research reactors

    International Nuclear Information System (INIS)

    Krull, W.

    1983-01-01

    The enrichment reduction for research reactors requires a licensing procedure. For this purpose the qualification of the new fuel has to be demonstrated and changes in reactor safety have to be investigated like reactivity values, form-factors, Pu- and fission product inventory, safety margins and accidents. Calculations should be partly experimentally verified. The possible extent of the licensing procedure is discussed. (orig.) [de

  1. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  2. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  3. Licensing in an international triopoly

    Science.gov (United States)

    Ferreira, Fernanda A.; Ferreira, Flávio

    2011-12-01

    We study the effects of entry of two foreign firms on domestic welfare in the presence of licensing, when the incumbent is technologically superior to the entrants. We consider two different situations: (i) the cost-reducing innovation is licensed to both entrants; (ii) the cost-reducing innovation is licensed to just one of the entrants. We analyse three kind of license: (lump-sum) fixed-fee; (per-unit) royalty; and two-part tariff, that is a combination of a fixed-fee and a royalty. We prove that a two part tariff is never an optimal licensing scheme for the incumbent. Moreover, (i) when the technology is licensed to the two entrants, the optimal contract consists of a licensing with only output royalty; and (ii) when the technology is licensed to just one of the entrants, the optimal contract consists of a licensing with only a fixed-fee.

  4. 75 FR 32786 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Science.gov (United States)

    2010-06-09

    ... follow specific procedures to submit information to FDA of any changes, in the product, production... feasible (or based on evidence of effectiveness from studies in animals). Section 601.93 provides that... an Antibiotic Drug for Human Use'' to harmonize application procedures between CBER and CDER. The...

  5. 9 CFR 2.11 - Denial of initial license application.

    Science.gov (United States)

    2010-01-01

    ... have violated any Federal, State, or local laws or regulations pertaining to animal cruelty within 1... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Denial of initial license application. 2.11 Section 2.11 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT...

  6. 14 CFR 431.73 - Continuing accuracy of license application; application for modification of license.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Continuing accuracy of license application; application for modification of license. 431.73 Section 431.73 Aeronautics and Space COMMERCIAL SPACE... Conditions § 431.73 Continuing accuracy of license application; application for modification of license. (a...

  7. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  8. Licensed Healthcare Facilities

    Data.gov (United States)

    California Natural Resource Agency — The Licensed Healthcare Facilities point layer represents the locations of all healthcare facilities licensed by the State of California, Department of Health...

  9. 2015 Business Licenses

    Data.gov (United States)

    City of Jackson, Mississippi — This data displays all business license information for the year of 2015. This information details license classifications and status. This information will updated...

  10. Teenagers' licensing decisions and their views of licensing policies: a national survey.

    Science.gov (United States)

    Williams, Allan F

    2011-08-01

    One objective was to determine teenage licensing rates on a national basis, interest in early licensure, and reasons for delay. A second objective was to learn teenagers' opinions about licensing policies, important in states considering ways to upgrade their current licensing systems. One thousand three hundred eighty-three 15- to 18-year-olds completed an online survey in November 2010. They were drawn from a nationally representative panel of US households recruited using probability-based sampling. The panel included cell phone-only households, and Internet access was provided to those without it. Weighting procedures were applied so that the study population represented the national US population of 15- to 18-year-olds. Most teens said that they were interested in getting a license as soon as legally possible, but many had not started the process. At 16, teens were about equally divided among those who had not started, those in the learner stage, and those with a restricted or full license. At 18, 62 percent had full licenses; 22 percent had not started. For those old enough to start, lack of a car, costs, parent availability, ability to get around without a car, and being busy with other activities were leading reasons for delay. The majority of teens were not in favor of higher licensing ages. Forty-six percent thought the minimum learner age should be 16; 30 percent thought the full license age should be 18 or older. The majority approved of night (78%) and passenger (57%) restrictions, and 85 and 93 percent endorsed cell phone and texting bans, respectively. When these policies were packaged together in a single law that included an age 16 start, night, passenger, cell phone and texting bans, and a full license at age 18, 74 percent of teens were in favor. Teenagers are not as supportive of strong licensing policies as parents of teens, but there is evidence that they will support comprehensive policies likely to lead to further reductions in teen crash

  11. Radiopharmaceutical licensing

    International Nuclear Information System (INIS)

    Mather, S.J.

    1992-01-01

    Recent health service legislation, and especially the loss of crown immunity has once again focussed attention on the arrangements for licensing of radiopharmaceuticals. The aim of the article is to describe in general terms the UK licensing system and in particular to provide guidance to those responsible for the supply of radiopharmaceuticals in hospitals. (author)

  12. On the “non-discrimination” aspect of FRAND licensing: A response to the Indian Competition Commission's recent orders

    Directory of Open Access Journals (Sweden)

    David J. Teece

    2018-03-01

    Full Text Available The Indian Competition Commission has recently challenged Ericsson's practice of licensing its standards-essential patents (SEPs, relating to cellular standards, for percentage-based royalties based on the selling prices of the end-user licensed products. Ericsson had committed to the relevant standards-development organisation that it would license its SEPs on “fair, reasonable and non-discriminatory” (“FRAND” terms. The Commission contends that such royalties are “prima facie discriminatory” in violation of the Competition Act, in the (novel sense that different products selling for different prices pay different per-unit royalties. We analyse the broader implications of the Commission's reasoning, concerned that if adopted, the Commission's reasoning would disrupt common industry licensing practices. Keywords: Patents, Licensing, Discrimination, Telecommunications, FRAND, Standards, Industry practice

  13. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  14. ACR: Licensing and design readiness

    International Nuclear Information System (INIS)

    Alizadeh, A.

    2009-01-01

    Full text The Canadian nuclear technology has a long history dating back to the 1940s. In this regard, Canada is in a unique situation, shared only by a very few countries, where original nuclear power technology has been invented and further developed. Canadian Nuclear Safety Commission (CNSC), then called AECB, was established in 1946. CNSC focuses on nuclear security, nuclear safety, establishing health and safety regulations, and has also played an instrumental role in the formation of the IAEA. CNSC has provided assistance to the establishment of regulatory authorities in AECL's client countries such as Korea, Argentina, China and Romania. AECL has developed the Gen III+ ACR 1000 as evolutionary advancement of the current CANDU 6 reactor. ACR-1000 has evolved from AECL's in depth experience with CANDU systems, components, and materials, as well as the feedback received from owners and operators of CANDU plants. The ACR-1000 design retains the proven strengths and features of CANDU reactors, while incorporating innovations and state-of-the-art technology. It also features major improvements in economics, inherent safety characteristics, and performance. ACR-1000 has completed its Basic Engineering, has advanced in the licensing process in Canada, and is ready for deployment in Canadian and world markets. EC6 is an evolution of CANDU 6 and is a Gen III natural uranium fuelled reactor. Its medium size and potential for fuel localization and advanced fuel cycles is an optimal strategic solution in many markets.AECL's reactor products are shown to be compliant with a variety of licensing and regulatory requirements. These include the new CNSC DRD-337, IAEA NS-R1, and EUR. This allows the countries interested in CANDU reactor products to be confident of its licensing in their own regulatory regimes.

  15. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  16. The SLOWPOKE licensing model

    Energy Technology Data Exchange (ETDEWEB)

    Snell, V. G.; Takats, F.; Szivos, K.

    1989-08-15

    The SLOWPOKE Energy System (SES-10) is a 10 MW heating reactor that has been developed in Canada. It will be capable of running without a licensed operator in continuous attendance, and will be sited in urban areas. It has forgiving safety characteristics, including transient time-scales of the order of hours. A process called `up-front` licensing has been evolved in Canada to identify, and resolve, regulatory concerns early in the process. Because of the potential market in Hungary for nuclear district heating, a licensing plan has been developed that incorporates Canadian licensing experience, identifies specific Hungarian requirements, and reduces the risk of licensing delays by seeking agreement of all parties at an early stage in the program.

  17. License to build

    International Nuclear Information System (INIS)

    Huntelaar, Mark; Vos, Renate de; Roobol, Lars

    2007-01-01

    Full text: A new license under the nuclear power act is applied for at the Dutch Government for the building of a High Active Repackaging Unit (HAVA-VU in Dutch) at NRG in Petten, The Netherlands. This new building is necessary to comply with our nuclear license to dispose of high active nuclear waste at Petten to the intermediate storage facility (COVRA). In the first part of this paper attention is given to the formal procedure followed by the Government, what type of documents are to be submitted, what time frames are followed, how citizen participation is organized, and as final result a new license. In the second part more detailed information is given about the present license renewal needed for the High Active Repackaging Unit

  18. 75 FR 35493 - Guidance for Industry on Systemic Lupus Erythematosus-Developing Medical Products for Treatment...

    Science.gov (United States)

    2010-06-22

    ...: The Food and Drug Administration (FDA) is announcing the availability of a guidance for industry... and Research (CBER), Food and Drug Administration, 1401 Rockville Pike, suite 200N, Rockville, MD...-0002, 301- 796-2280; or Stephen Ripley, Center for Biologics Evaluation and Research (HFM- 17), Food...

  19. Evaluation of Terminated Nuclear Material Licenses

    International Nuclear Information System (INIS)

    Spencer, K.M.; Zeighami, E.A.

    1999-01-01

    This report presents the results of a six-year project that reviewed material licenses that had been terminated during the period from inception of licensing until approximately late-1994. The material licenses covered in the review project were Part 30, byproduct material licenses; Part 40, source material licenses; and Part 70, special nuclear material licenses. This report describes the methodology developed for the project, summarizes the findings of the license file inventory process, and describes the findings of the reviews or evaluations of the license files. The evaluation identified nuclear material use sites that need review of the licensing material or more direct follow-up of some type. The review process also identified licenses authorized to possess sealed sources for which there was incomplete or missing documentation of the fate of the sources

  20. 10 CFR 40.34 - Special requirements for issuance of specific licenses.

    Science.gov (United States)

    2010-01-01

    ... license to manufacture industrial products and devices containing depleted uranium, or to initially....32; (2) The applicant submits sufficient information relating to the design, manufacture, prototype... industrial product or device to provide reasonable assurance that possession, use, or transfer of the...

  1. Contestable Licensing

    OpenAIRE

    Zvika Neeman; Gerhard O. Orosel

    2000-01-01

    We analyze a model of repeated franchise bidding for natural monopoly with contestable licensing - a franchisee halds an (exclusive) license to operate a franchise until another rm offers to pay more for it. In a world where quality is observable but not veri able, the simple regulatory scheme we describe combines market-like incentives with regulatory oversight to generate efficient outcomes.

  2. Breeding of newly licensed wheat variety Huapei 8 and improved ...

    African Journals Online (AJOL)

    ajl yemi

    2011-12-28

    Dec 28, 2011 ... Full Length Research Paper. Breeding of newly licensed wheat variety Huapei 8 and improved breeding strategy by anther culture ... more efficient in pure line selection rather than the hete- .... Regional and productivity tests showed that Huapei 8 had .... Large-scale production of wheat and triticale double.

  3. 76 FR 62407 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-10-07

    ... & Product Logistics Manager (Qualifying Individual), Thomas B. Crowley, Director, Application Type: QI... at (202) 523-5843 or by e-mail at [email protected] . Alltransport International Logistics, Inc. (NVO), 63... Individual), Application Type: New NVO License. American Global Logistics LLC dba AGL (NVO & OFF), 3399...

  4. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  5. 31 CFR 596.306 - License.

    Science.gov (United States)

    2010-07-01

    ... ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.306 License. Except as otherwise specified, the term license means any license or...

  6. Nuclear power stations licensing

    International Nuclear Information System (INIS)

    Solito, J.

    1978-04-01

    The judicial aspects of nuclear stations licensing are presented. The licensing systems of the United States, Spain, France and Federal Republic of Germany are focused. The decree n 0 60.824 from July 7 sup(th), 1967 and the following legislation which define the systematic and area of competence in nuclear stations licensing are analysed [pt

  7. 10 CFR 51.22 - Criterion for categorical exclusion; identification of licensing and regulatory actions eligible...

    Science.gov (United States)

    2010-01-01

    ... requirements. (11) Issuance of amendments to licenses for fuel cycle plants and radioactive waste disposal.... (xii) Acceptance of packaged radioactive wastes from others for transfer to licensed land burial... the following types of activities: (i) Distribution of radioactive material and devices or products...

  8. General aspects of radiological protection to consider for the licensing a hospital cyclotron

    International Nuclear Information System (INIS)

    Andrada Contardi, F.A.; Fruttero, N.H.; Bozzo, R.H.; Moschella, E.G.

    2010-01-01

    The use of PET/PET-CT studies for a variety of diagnoses has increased significantly on a global scale. Modern medical cyclotrons must be placed in or near hospitals on account of the short radioactive half-life of the pharmaceuticals used in such studies. Many countries in Latin America are now licensing cyclotrons and laboratories for the production of radio-pharmaceuticals for the first time, and most are expected to have installations within the near future. This report outlines the general aspects of radiological protection important to consideration during the licensing of these facilities, and includes the following: general operation of the cyclotron and laboratory for the production of radiopharmaceuticals, safety systems (shielding, interlocks, ventilation, manual safety systems, alarms and monitors), and general aspects for licensing an installation (monitoring, accidental and incidental events, activation of components, etc.) and personnel. (authors) [es

  9. Learning-by-Licensing: How Chinese Firms Benefit From Licensing-In Technologies

    DEFF Research Database (Denmark)

    Wang, Yuandi; Roijakkers, N.; Vanhaverbeke, W.

    2012-01-01

    This paper explores how interfirm variations in their in-licensed technology portfolios influence subsequent innovation performance. Existing studies mainly assume licensed technologies are homogeneously accessible to firms, and a prevailing explanation as to why firms vary in their innovation pe...

  10. 78 FR 70306 - Distribution of In Vitro Diagnostic Products Labeled for Research Use Only or Investigational Use...

    Science.gov (United States)

    2013-11-25

    ... Development (HFM-40), Center for Biologics Evaluation and Research (CBER), Food and Drug Administration, 1401...: Guidance for Industry and Food and Drug Administration Staff; Availability AGENCY: Food and Drug... Research (HFM-17), Food and Drug Administration, 1401 Rockville Pike, Suite 200N, Rockville, MD 20852-1448...

  11. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  12. Trends in nuclear licensing

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, N W [Council for Nuclear Safety, Hennopsmeer, Pretoria (South Africa)

    1990-06-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  13. Trends in nuclear licensing

    International Nuclear Information System (INIS)

    Dalton, N.W.

    1990-01-01

    The development of nuclear safety and licensing is briefly reviewed in four stages namely: The Formative Period (1946-1959), The Expansive Period (1960-1969), The Mature Period (1970-1979) and the Apprehensive Period (1980-1989). Particular safety issues in the respective periods are highlighted to indicate the changing emphasis of nuclear licensing over the past thirty years or so. Against this background, nuclear licensing. (author)

  14. 76 FR 13973 - United States Warehouse Act; Processed Agricultural Products Licensing Agreement

    Science.gov (United States)

    2011-03-15

    ... security of goods in the care and custody of the licensee. The personnel conducting the examinations will..., Warehouse Operations Program Manager, FSA, United States Department of Agriculture, Mail Stop 0553, 1400... continuing compliance with the standards of approval and operation. FSA will conduct examinations of licensed...

  15. Streamlining the license renewal review process

    International Nuclear Information System (INIS)

    Dozier, J.; Lee, S.; Kuo, P.T.

    2001-01-01

    The staff of the NRC has been developing three regulatory guidance documents for license renewal: the Generic Aging Lessons Learned (GALL) report, Standard Review Plan for License Renewal (SRP-LR), and Regulatory Guide (RG) for Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses. These documents are designed to streamline the license renewal review process by providing clear guidance for license renewal applicants and the NRC staff in preparing and reviewing license renewal applications. The GALL report systematically catalogs aging effects on structures and components; identifies the relevant existing plant programs; and evaluates the existing programs against the attributes considered necessary for an aging management program to be acceptable for license renewal. The GALL report also provides guidance for the augmentation of existing plant programs for license renewal. The revised SRP-LR allows an applicant to reference the GALL report to preclude further NRC staff evaluation if the plant's existing programs meet the criteria described in the GALL report. During the review process, the NRC staff will focus primarily on existing programs that should be augmented or new programs developed specifically for license renewal. The Regulatory Guide is expected to endorse the Nuclear Energy Institute (NEI) guideline, NEI 95-10, Revision 2, entitled 'Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule', which provides guidance for preparing a license renewal application. This paper will provide an introduction to the GALL report, SRP-LR, Regulatory Guide, and NEI 95-10 to show how these documents are interrelated and how they will be used to streamline the license renewal review process. This topic will be of interest to domestic power utilities considering license renewal and international ICONE participants seeking state-of-the-art information about license renewal in the United States

  16. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  17. Cyclotron facilities in Brazil: Current status and licensing aspects

    International Nuclear Information System (INIS)

    Facure, A.; Carvalho, S.M.; Di Prinzio, R.; Silveira, C.S.; Gasparian, P.B.R.; Franca, W.F.

    2017-01-01

    Positron Emission Tomography (PET) is a highly sensitive and accurate nuclear medicine imaging technology but the major problem of this technique is the use of radioisotopes with short half-life, less than two hours. The production and selling of short half-life radioisotopes used to be monopoly of the Brazilian Government. In 2006, a Constitutional Amendment revoked the state monopoly due to the need for the use of short half-life radioisotopes in nuclear medicine centers very far from the government production facilities. The aim of this study is to describe the current status of short half-life radioisotopes production in Brazil and discuss some licensing process. In Brazil, as has been occurring worldwide, the number of nuclear medicine centers is increasing. Currently there are 123 services performing PET scans in Brazil. There are 14 cyclotrons operating in Brazil. The type of licensing process conducted in Brazil does not take into account the population density of each state, with a free competition model being adopted. Because of this there is a lot of equipment concentrated in the Southeast and no cyclotrons operating in the Northern part of the country. One of the biggest obstacles during the licensing process is the designation of qualified personnel as operation workers and radiation safety officers. The number of cyclotron accelerators and PET/CT equipment increased in recent years. However, a number of external factors such as the distance from the nuclear medicine centers, and qualified personnel have proved crucial for the economic viability of this type of facility. (author)

  18. Cyclotron facilities in Brazil: Current status and licensing aspects

    Energy Technology Data Exchange (ETDEWEB)

    Facure, A.; Carvalho, S.M.; Di Prinzio, R.; Silveira, C.S.; Gasparian, P.B.R.; Franca, W.F., E-mail: facure@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil)

    2017-09-01

    Positron Emission Tomography (PET) is a highly sensitive and accurate nuclear medicine imaging technology but the major problem of this technique is the use of radioisotopes with short half-life, less than two hours. The production and selling of short half-life radioisotopes used to be monopoly of the Brazilian Government. In 2006, a Constitutional Amendment revoked the state monopoly due to the need for the use of short half-life radioisotopes in nuclear medicine centers very far from the government production facilities. The aim of this study is to describe the current status of short half-life radioisotopes production in Brazil and discuss some licensing process. In Brazil, as has been occurring worldwide, the number of nuclear medicine centers is increasing. Currently there are 123 services performing PET scans in Brazil. There are 14 cyclotrons operating in Brazil. The type of licensing process conducted in Brazil does not take into account the population density of each state, with a free competition model being adopted. Because of this there is a lot of equipment concentrated in the Southeast and no cyclotrons operating in the Northern part of the country. One of the biggest obstacles during the licensing process is the designation of qualified personnel as operation workers and radiation safety officers. The number of cyclotron accelerators and PET/CT equipment increased in recent years. However, a number of external factors such as the distance from the nuclear medicine centers, and qualified personnel have proved crucial for the economic viability of this type of facility. (author)

  19. NUMARC view of license renewal criteria

    International Nuclear Information System (INIS)

    Edwards, D.W.

    1989-01-01

    The Atomic Energy Act and the implementing regulations of the US Nuclear Regulatory Commission (NRC) permit the renewal of nuclear plant operating licenses upon expiration of their 40-year license term. However, the regulatory process by which license renewal may be accomplished and the requirements for the scope and content of renewal applications are yet to be established. On August 29, 1988, the NRC published an Advanced Notice of Proposed Rulemaking regarding the subject of license renewal. This Advanced Notice and the NUREG which it references, NUREG-1317, Regulatory Options for Nuclear Plant License Renewal, provide the most recent regulatory thought on this issue. The basic issue addressed by NUREG-1317 is the definition of an adequate licensing basis for the renewal of a plant license. The report contemplates three alternatives in this regard. This paper discusses each of these three proposals. The NUMARC NUPLEX Working Group endorses a license renewal process based on a plant's current licensing basis along with an evaluation of the pertinent components, systems, and structures affected by age-related degradation. The NUMARC NUPLEX Working group believes that an appropriate scope for NRC review of the license renewal application should focus on those safety-significant structures systems, and components subject to significant age-related degradation that are not subject to existing recognized effective replacement, refurbishment, or inspection programs. The paper also briefly discusses NUMARC's view of the role of the Backfit Rule in the license renewal process

  20. Graduated driver licensing and differential deterrence: The effect of license type on intentions to violate road rules.

    Science.gov (United States)

    Poirier, Brigitte; Blais, Etienne; Faubert, Camille

    2018-01-01

    In keeping with the differential deterrence theory, this article assesses the moderating effect of license type on the relationship between social control and intention to violate road rules. More precisely, the article has two objectives: (1) to assess the effect of license type on intentions to infringe road rules; and (2) to pinpoint mechanisms of social control affecting intentions to violate road rules based on one's type of driver license (a restricted license or a full license). This effect is examined among a sample of 392 young drivers in the province of Quebec, Canada. Drivers taking part in the Graduated Driver Licensing (GDL) program have limited demerit points and there is zero tolerance for drinking-and-driving. Propensity score matching techniques were used to assess the effect of the license type on intentions to violate road rules and on various mechanisms of social control. Regression analyses were then conducted to estimate the moderating effect of license type. Average treatment effects from propensity score matching analyses indicate that respondents with a restricted license have lower levels of intention to infringe road rules. While moral commitment and, to a lesser extent, the perceived risk of arrest are both negatively associated with intentions to violate road rules, the license type moderates the relationship between delinquent peers and intentions to violate road rules. The effect of delinquent peers is reduced among respondents with a restricted driver license. Finally, a diminished capability to resist peer pressure could explain the increased crash risk in months following full licensing. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. Psychological characteristics of licensed nuclear power plant operators

    International Nuclear Information System (INIS)

    Sajwaj, T.; Ford, T.; McGee, R.K.

    1987-01-01

    The safe production of electricity by nuclear power plants has been the focus of considerable attention. Much of this concern has been focused on equipment and procedural issues, with less attention to the psychological factors that affect the operations staff of the plants, i.e., those individuals who are most directly responsible for a plant's operations. Stress and type A qualities would be significant for these individuals because of their relationships to job performance and health. Of equal significance would be work-related factors, such as job involvement and work pressure. Also of interest would be hostile tendencies because of the need for cooperation and communications among operations staff. Two variables could influence these psychological factors. One is the degree of responsibility for a plant's nuclear reactors. The individuals with the greatest responsibility are licensed by the US Nuclear Regulatory Commission (NRC). There are also individuals with less direct responsibilities who are not licensed. A second variable is the operating status of the plant, whether or not the plant is currently producing electricity. Relative to ensuring the safe operation of nuclear power plants, these data suggest a positive view of licensed operators. Of interest are the greater stress scores in the licensed staff of the operating plant in contrast with their peers in the nonoperating plant

  2. Establishing a safety and licensing basis for generation IV advanced reactors. License by test

    International Nuclear Information System (INIS)

    Kadak, Andrew C.

    2001-01-01

    The license by test approach to licensing is a novel method of licensing reactors. It provides an opportunity to deal with innovative non-water reactors in a direct way on a time scale that could permit early certification based on tests of a demonstration reactor. The uncertainties in the design and significant contributors to risk would be identified in the PRA during the design. Deterministic analysis computer codes could be tested on a real reactor. Scaling effects and associated uncertainties would be minimized. License by test is an approach that has sufficient merit to be developed and tested

  3. 22 CFR 96.30 - State licensing.

    Science.gov (United States)

    2010-04-01

    ... Licensing and Corporate Governance § 96.30 State licensing. (a) The agency or person is properly licensed or... person follows applicable State licensing and regulatory requirements in all jurisdictions in which it provides adoption services. (c) If it provides adoption services in a State in which it is not itself...

  4. Licensing process characteristics of Small Modular Reactors and spent nuclear fuel repository

    Energy Technology Data Exchange (ETDEWEB)

    Söderholm, Kristiina, E-mail: kristiina.soderholm@fortum.com [Fortum Power (Finland); Tuunanen, Jari, E-mail: jari.tuunanen@fortum.com [Fortum Power (Finland); Amaba, Ben, E-mail: baamaba@us.ibm.com [IBM Complex Systems (United States); Bergqvist, Sofia, E-mail: sofia.bergqvist@se.ibm.com [IBM Rational Software (Sweden); Lusardi, Paul, E-mail: plusardi@nuscalepower.com [NuScale Power (United States)

    2014-09-15

    Highlights: • We examine the licensing process challenges of modular nuclear facilities. • We compare the features of Small Modular Reactors and spent nuclear fuel repository. • We present the need of nuclear licensing simplification. • Part of the licensing is proposed to be internationally applicable. • Systems engineering and requirements engineering benefits are presented. - Abstract: This paper aims to increase the understanding of the licensing processes characteristics of Small Modular Reactors (SMR) compared with licensing of spent nuclear fuel repository. The basis of the SMR licensing process development lies in licensing processes used in Finland, France, the UK, Canada and the USA. These countries have been selected for this study because of their various licensing processes and recent actions in the new NPP construction. Certain aspects of the aviation industry licensing process have also been studied and selected practices have been investigated as possibly suitable for use in nuclear licensing. Suitable features for SMR licensing are emphasized and suggested. The licensing features of the spent nuclear fuel deep repository along with similar features of SMR licensing are discussed. Since there are similar types of challenges of lengthy licensing time frames, as well as modular features to be taken into account in licensing, these two different nuclear industry fields can be compared. The main SMR features to take into account in licensing are: • Standardization of the design. • Modularity. • Mass production. • Serial construction. Modularity can be divided into two different categories: the first category is simply a single power plant unit constructed of independently engineered modules (e.g. construction process for Westinghouse AP-1000 NPP) and the second one a power plant composed of many reactor modules, which are manufactured in factories and installed as needed (e.g. NuScale Power SMR design). The deep underground repository

  5. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  9. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  10. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  12. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  13. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  14. Licensing in an International Market

    Science.gov (United States)

    Ferreira, Fernanda A.

    2008-09-01

    We study the effects of entry of a foreign firm on domestic welfare in the presence of licensing, when the entrant is technologically superior to the incumbent. We show that foreign entry increases domestic welfare for sufficiently large technological differences between the firms under both fixed-fee licensing and royalty licensing.

  15. 22 CFR 120.20 - License.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false License. 120.20 Section 120.20 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS PURPOSE AND DEFINITIONS § 120.20 License. License means a document bearing the word “license” issued by the Directorate of Defense Trade...

  16. 48 CFR 227.7203-4 - License rights.

    Science.gov (United States)

    2010-10-01

    ... Software and Computer Software Documentation 227.7203-4 License rights. (a) Grant of license. The... license, under an irrevocable license granted or obtained by the contractor which developed the software... granted to the Government. The scope of a computer software license is generally determined by the source...

  17. Current status of construction license of PEFP

    International Nuclear Information System (INIS)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T.

    2012-01-01

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically

  18. Current status of construction license of PEFP

    Energy Technology Data Exchange (ETDEWEB)

    Kim, J. Y.; Cho, J. S.; Min, Y. S.; Nam, J. M.; Jeon, G. P.; Park, S. S.; Jo, J. H.; Song, I. T. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    Since 2010 August, PEFP(Proton Engineering Frontier Project)'s Proton Accelerator Research Center has been under construction so far. Generally, in advance of construction startup, many kinds of licenses should be acquired along with the types of construction works. To acquire a license in time, each item should meet the standard by the related regulation, including not only procedural but also content aspect. In the advent of internet era, electronic government system has been adopted in many governmental functions: So is the national construction license acquisition system. Owing to the system, both approval and documentation functions in licensing are integrated in online computer network which provide us simplification in process and easy accessibility to license data. However, aside from these construction licenses, other types of licenses still remain separately managed: Machinery, electric facilities, and so on. Moreover, all the licenses have the priority order and take legal term in processing. So, to avoid any time delay in license acquisition, we organized license hierarchy and found out the priority among them. Thereafter, according to their legal term in approval and acquisition, whole license acquisition schedule was arranged and we completed all the necessary licenses acquisition in time In this study, we summarize the current status of license acquisition on Proton Accelerator Research Center Construction, and manifest how they have been and will be managed systematically.

  19. Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    acquisition. The findings indicate that technology licensing is positively related to the number of inventions produced by the licensee in the years subsequent to the licensing deal. Subsequently, I investigate the moderating effect that organizational slack and myopia have on this main relationship....... The findings also suggest that high levels of Organizational Slack (available financial resources) strengthen the positive effect of licensing on innovation. However, higher levels of Organizational Myopia (the extent to which a firm draws on its own knowledge) can decrease the main effect of licensing....

  20. Assessment and improvement on system of licensing for work with ionizing radiation in China

    International Nuclear Information System (INIS)

    Sun Xiaobo

    1998-01-01

    The article outlined regulations, authorities and responsibilities for licensing in China. The health departments at provincial level issue the license certificates to the units engaging in the production, use or sale of radioisotopes or apparatus equipped with radiation source or radiation-emitting apparatus, and have the duty of supervising and monitoring the security about radiation work. For the particular dangers of radiation sources, there is deficiency and shortage of the current licensing system, such as ignorance of the importance of keeping detail records about sources, poor communications among every health department, poor actions to prevent illegal and secret radiation work such as secret use and sale. We are going to improve our licensing system by hardware (computer technology) and software (management). (author)

  1. Cost and risk reduction using upfront licensing in Canada. Annex 15

    International Nuclear Information System (INIS)

    Snell, V.G.

    2002-01-01

    The paper summarizes the use of 'up-front' licensing in Canada - how licensing requirements are defined, and met - in advance of a project commitment. The approach to licensing in Canada has allowed flexibility in development of new designs. Since licensing was originally risk-based, and current regulatory policy allows cost-benefit considerations as part of the decision making, risk can be and should be used in novel circumstances as a licensing tool. Since the licensing framework is non-prescriptive, innovative approaches to design can be introduced and dispositioned without changing the legal structure. This flexibility has been used in several up-front licensing reviews: a small urban heating reactor, repeat CANDU 6 generating station units, and the single unit CANDU 9 generating station. In the future we expect to apply it to advanced designs, as an essential part of risk reduction and customer confidence in the product. The important lessons learned in Canada include: Up-front licensing is essential to reduce the risk of licensing-related delays once a project has been committed. It requires a significant investment in time and effort from both the designer and the regulator; The most effective scope for up-front licensing is for the regulator to thoroughly assess novel concepts, test the design against changed domestic requirements, and follow-up on known difficult areas; and for the designer to ensure foreign requirements are incorporated. There is little benefit in certifying the design in detail; Although it would be satisfying to have legally-binding certification, in the end there can be no legal obligation on the regulator, and agreement is pursued on the basis of good faith that the regulator will not make arbitrary decisions and that the designer will meet agreed targets or requirements; In almost all circumstances, issues will arise that are beyond the current 'rules', however expressed. Rather than rushing to create new rules, one reaches a

  2. Licensing process for safety-critical software-based systems

    Energy Technology Data Exchange (ETDEWEB)

    Haapanen, P. [VTT Automation, Espoo (Finland); Korhonen, J. [VTT Electronics, Espoo (Finland); Pulkkinen, U. [VTT Automation, Espoo (Finland)

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications

  3. Licensing process for safety-critical software-based systems

    International Nuclear Information System (INIS)

    Haapanen, P.; Korhonen, J.; Pulkkinen, U.

    2000-12-01

    System vendors nowadays propose software-based technology even for the most critical safety functions in nuclear power plants. Due to the nature of software faults and the way they cause system failures new methods are needed for the safety and reliability evaluation of these systems. In the research project 'Programmable automation systems in nuclear power plants (OHA)', financed together by the Radiation and Nuclear Safety Authority (STUK), the Ministry of Trade and Industry (KTM) and the Technical Research Centre of Finland (VTT), various safety assessment methods and tools for software based systems are developed and evaluated. As a part of the OHA-work a reference model for the licensing process for software-based safety automation systems is defined. The licensing process is defined as the set of interrelated activities whose purpose is to produce and assess evidence concerning the safety and reliability of the system/application to be licensed and to make the decision about the granting the construction and operation permissions based on this evidence. The parties of the licensing process are the authority, the licensee (the utility company), system vendors and their subcontractors and possible external independent assessors. The responsibility about the production of the evidence in first place lies at the licensee who in most cases rests heavily on the vendor expertise. The evaluation and gauging of the evidence is carried out by the authority (possibly using external experts), who also can acquire additional evidence by using their own (independent) methods and tools. Central issue in the licensing process is to combine the quality evidence about the system development process with the information acquired through tests, analyses and operational experience. The purpose of the licensing process described in this report is to act as a reference model both for the authority and the licensee when planning the licensing of individual applications. Many of the

  4. 31 CFR 596.309 - Specific license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.309 Specific license. The term specific license means any license or...

  5. Online driver's license renewal.

    Science.gov (United States)

    2015-09-01

    The Kentucky Department of Vehicle Regulation is exploring the possibility of developing and implementing online : drivers license renewal. The objective of this project was to: 1) evaluate online drivers license and REAL ID renewal : programs ...

  6. The need for legislative framework (licensing)

    International Nuclear Information System (INIS)

    Krech, H.

    1977-01-01

    For reasons of public acceptance the basis of a licensing system should be laid down in a law, details can be fixed in regulations below the law-level. The competence for licensing nuclear installations should be attributed to one body, which is not a the same time charged with the promotion of nuclear energy. The licensing authority has to be provided with sufficient technical advice, given by experts organized in advisory bodies. Normally a licensing procedure is split into several steps (site approval, construction permit, operation licence), each step can be subdivided. Some general aspects of licensing conditions (personal, technical and financial) as well as of the licensing procedure are outlined. The participation of the public is of particular importance but also involves most intricate problems. The paper concludes with some critical remarks on the role of administrative courts with respect to the licensing of nuclear power plants. (orig.) [de

  7. 31 CFR 596.305 - General license.

    Science.gov (United States)

    2010-07-01

    ... FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY TERRORISM LIST GOVERNMENTS SANCTIONS REGULATIONS General Definitions § 596.305 General license. The term general license means any license or authorization...

  8. Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues

    International Nuclear Information System (INIS)

    Silverman, D.J.; Bauser, M.A.; Baird, R.D.

    1998-07-01

    This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application

  9. EMPIRICAL STUDY OF CAR LICENSE PLATES RECOGNITION

    Directory of Open Access Journals (Sweden)

    Nasa Zata Dina

    2015-01-01

    Full Text Available The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms have been proposed by many researchers. License plate recognition requires license plate detection, segmentation, and charac-ters recognition. The algorithm detects the position of a license plate and extracts the characters. Various license plate recognition algorithms have been implemented, and each algorithm has its strengths and weaknesses. In this research, I implement three algorithms for detecting license plates, three algorithms for segmenting license plates, and two algorithms for recognizing license plate characters. I evaluate each of these algorithms on the same two datasets, one from Greece and one from Thailand. For detecting li-cense plates, the best result is obtained by a Haar cascade algorithm. After the best result of license plate detection is obtained, for the segmentation part a Laplacian based method has the highest accuracy. Last, the license plate recognition experiment shows that a neural network has better accuracy than other algo-rithm. I summarize and analyze the overall performance of each method for comparison.

  10. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  11. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  12. Department of Energy licensing strategy

    International Nuclear Information System (INIS)

    Frei, M.W.

    1984-01-01

    The Department of Energy (DOE) is authorized by the Nuclear Waste Policy Act of 1982 (Act) to site, design, construct, and operate mined geologic repositories for high-level radioactive wastes and is required to obtain licenses from the Nuclear Regulatory Commission (NRC) to achieve that mandate. To this end the DOE has developed a licensing approach which defines program strategies and which will facilitate and ease the licensing process. This paper will discuss the regulatory framework within which the repository program is conducted, the DOE licensing strategy, and the interactions between DOE and NRC in implementing the strategy. A licensing strategy is made necessary by the unique technical nature of the repository. Such a facility has never before been licensed; furthermore, the duration of isolation of waste demanded by the proposed EPA standard will require a degree of reliance on probabilistic performance assessment as proof of compliance that is a first of a kind for any industry. The licensing strategy is also made necessary by the complex interrelationships among the many involved governmental agencies and even within DOE itself, and because these relationships will change with time. Program activities which recognize these relationships are essential for implementing the Act. The guiding principle in this strategy is an overriding commitment to safeguarding public health and safety and to protecting the environment

  13. Application of up-front licensing

    Energy Technology Data Exchange (ETDEWEB)

    Grant, S D [Atomic Energy of Canada Ltd., Saskatoon, SK (Canada); Snell, V G [Atomic Energy of Canada Ltd., Mississauga, ON (Canada)

    1996-12-31

    AECL has been pioneering `up-front` licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs.

  14. Application of up-front licensing

    International Nuclear Information System (INIS)

    Grant, S.D.; Snell, V.G.

    1995-01-01

    AECL has been pioneering 'up-front' licensing of new reactor designs. The CANDU 3 design has been formally reviewed by AECB staff for a number of years. The CANDU 9 design has just started the up-front licensing process. The process gives designers, regulators and potential customers early confidence in the licensability of future plants. (author). 4 refs., 2 tabs

  15. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  16. License renewal in the United States

    International Nuclear Information System (INIS)

    Brons, Jack

    2002-01-01

    Full text: Nuclear plants in the United States are licensed for 40 years, a length specified in the Atomic Energy Act of 1954, which laid out much of the regulatory basis for the commercial nuclear industry. The Act, however, made provision for license renewal. The original 40-year license period was chosen arbitrarily by the U.S. Congress because it was the typical period over which utilities recovered their investment in electricity generating plants. Nuclear plants, however, are subject to a rigorous program of Nuclear Regulatory Commission oversight, maintenance and equipment replacement. In effect, they must be in the same operating condition on the last day of their licenses as they were on the first. As the industry matured, it became apparent that there was no physical limitation on the continued operation of nuclear plants past 40 years. The industry turned its attention toward license renewal. When the issue was first raised, the NRC considered stringent process equivalent to seeking a new operating license for each plant. The complexity, length and cost of the process made it unlikely that many nuclear plants would seek license renewal. The nuclear industry worked successfully with NRC on the application of generic principles to license renewal, however, and in 1995, the NRC issued an efficient, tightly-focused rule that made license renewal a safe, viable option. To extend the operating license for a reactor, a company must demonstrate to the NRC that aging effects will be adequately managed during the renewal terms, thus ensuring equipment functionality. The rule allows licensees to apply for extensions of up to 20 years. The first license renewal application was filed in 1998 by the owner of the two-unit Calvert Cliffs plant. Shortly thereafter, an application was filed for the three-unit Oconee Nuclear Station. The NRC renewed the licenses for all five units in 2000, and since then, five more licenses have been renewed. The NRC has received 37

  17. ITER Safety and Licensing

    International Nuclear Information System (INIS)

    Girard, J-.P; Taylor, N.; Garin, P.; Uzan-Elbez, J.; GULDEN, W.; Rodriguez-Rodrigo, L.

    2006-01-01

    The site for the construction of ITER has been chosen in June 2005. The facility will be implemented in Europe, south of France close to Marseille. The generic safety scheme is now under revision to adapt the design to the host country regulation. Even though ITER will be an international organization, it will have to comply with the French requirements in the fields of public and occupational health and safety, nuclear safety, radiation protection, licensing, nuclear substances and environmental protection. The organization of the central team together with its partners organized in domestic agencies for the in-kind procurement of components is a key issue for the success of the experimentation. ITER is the first facility that will achieve sustained nuclear fusion. It is both important for the experimental one-of-a-kind device, ITER itself, and for the future of fusion power plants to well understand the key safety issues of this potential new source of energy production. The main safety concern is confinement of the tritium, activated dust in the vacuum vessel and activated corrosion products in the coolant of the plasma-facing components. This is achieved in the design through multiple confinement barriers to implement the defence in depth approach. It will be demonstrated in documents submitted to the French regulator that these barriers maintain their function in all postulated incident and accident conditions. The licensing process started by examination of the safety options. This step has been performed by Europe during the candidature phase in 2002. In parallel to the final design, and taking into account the local regulations, the Preliminary Safety Report (RPrS) will be drafted with support of the European partner and others in the framework of ITER Task Agreements. Together with the license application, the RPrS will be forwarded to the regulatory bodies, which will launch public hearings and a safety review. Both processes must succeed in order to

  18. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  19. Decay power evaluation for licensing analysis

    International Nuclear Information System (INIS)

    Tran, H.; Schrock, V.E.

    1987-01-01

    The ANSI/ANS 5.1-1979 Standard on Decay Power in shutdown reactors has been available as the basis for accident analysis for the past 7 yr. The US Nuclear Regulatory Commission has made a commitment to use this standard in new licensing approaches and has approved a licensing model for boiling water. More sweeping changes in the licensing rules are currently under review that will involve the use of best-estimate models and a statistical evaluation of the uncertainty (95% confidence level) in the key results. The structure of the decay power standard is well suited for such applications because it provides a statistically meaningful uncertainty in the decay power from fission products. The normalized decay power is a function specific to each point in the reactor volume due to the fact that the fuel composition develops a spatial dependence as burnup proceeds and decay power depends on the mix of fissioning nuclides. For reactor safety calculations it is desirable to employ a single temporal decay power function for the whole core inasmuch as many variations of accident parameters are required. This is the usual approach in large system thermal-hydraulics codes. Such a single representative or generic curve for a specified total operating power history can be acceptable but at the expense of some increase in the uncertainty. In this paper, the author present a method of evaluating the additional uncertainty in the decay power associated with use of a generic curve

  20. The comparison of license management procedure for nuclear power plant in China and United States

    International Nuclear Information System (INIS)

    Yu Zusheng

    2006-01-01

    'Tow steps' license management procedure for nuclear power plant has been performed bas- ted on the requirement of 10CFR Part50-DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES in United States since last century fifties. In order to ulterior reduce the risk of investment and technical for new construction nuclear power plants, new regulations 'One step' license management procedure-10CFR Part52-EARLY SITE PERMITS; STANDARD DESIGN CERTIFICATIONS; AND COMBINED LICENSES FOR NUCLEAR POWER PLANTS issued in 1989. The new regulations has been adopted by new design of nuclear power plant, for example AP1000. ‘The similar tow steps’ license management procedure for nuclear power plant has been performed basted on the requirement of HAFO01/01 Rules for the Implementation of Regulations on the Safety Regulation for Civilian Nuclear Installations of the People's Re- public of China Part One: Application and Issuance of Safety License for Nuclear Power Plant (December 1993) in China since last century nineties. This article introduces and compares the requirements and characteristics of above license management procedure for nuclear power plant in China and United States. (author)

  1. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    OpenAIRE

    Marco Ciurcina

    2017-01-01

    This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  2. The Transaction Cost Benefits of Electronic Patent Licensing Platforms: A Discussion at the Example of the PatentBooks Model

    OpenAIRE

    Ghafele, Roya; Gibert, Benjamin

    2011-01-01

    Current mechanisms to compensate inventors and improve legal access to their inventions remain ineffective. Manufacturers encounter significant transaction costs in the process of licensing the multitude of patent rights implicated in their products. High-technology product manufacturing requires access to a diverse pool of technologies that are owned by different organizations all over the world. The transaction costs of licensing these disparate rights are inhibiting unlicensed manufacturer...

  3. 7 CFR 6.28 - Transfer of license.

    Science.gov (United States)

    2010-01-01

    ... Licensing Authority will transfer to such other person the historical, nonhistorical or designated license... escrow with the sole condition for return of escrow being that the Licensing Authority determines that... to whom the historical licenses were issued during the quota year in which the sale or conveyance...

  4. Free Software Licenses and Other Free Licenses: Genetic Code of Digital Common Goods

    Directory of Open Access Journals (Sweden)

    Marco Ciurcina

    2017-06-01

    Full Text Available This article explores the history and describes the main features of free software licenses and other free licenses in an attempt to shed light on the reasons for their success in promoting individual behaviors converging towards the collective construction of digital commons.

  5. Licensing Teachers: Lessons from Other Professions.

    Science.gov (United States)

    Haberman, Martin

    1986-01-01

    The licensing of teachers should be modeled against professions similar to teaching rather than professions like medicine and architecture that are vastly different. Applying similar licensing practices can raise the status of teaching. Ignoring these licensing practices will prevent teachers from functioning as professionals. (MD)

  6. Licensing of nuclear and radioactive installations in Peru

    International Nuclear Information System (INIS)

    Medina Gironzini, E.

    1987-01-01

    In Peru, the Regulation for Ionizing Radiation Sources is applied, which establishes the norms and procedures to follow in the nuclear and radioactive installations of the country in order to assure their correct operation as concerns to the nuclear safety and radiological protection, allowing the emission of the respective licenses. As for the nuclear facilities, this authorization includes the Previous License, the Construction License and the Operation License (provisional and definitive) and for radioactive facilities and equipment generating ionizing radiations: the Construction License and the Operation License. The personnel also require a license that can be an operator license (as for nuclear reactors) or a supervisor license (for nuclear and radioactive facilities). In spite of the above mentioned regulation and its long enforcement period, less than 10% of radioactive facilities in this country are licensed, due to different problems which will be solved in the medium term. (Author)

  7. The licensing processes influence on nuclear market

    International Nuclear Information System (INIS)

    Locatelli, Giorgio; Mancini, Mauro; Sainati, Tristano; Sallinen, Liisa

    2011-01-01

    The paper deals with the licensing nuclear power plants; it focuses primarily on the licensing process implications into the international nuclear market. Nowadays there are twenty-six countries that are planning to build new nuclear facilities, and thirty-seven where nuclear reactors are proposed; on the other hand, there are mainly ten international reactor vendors. At international level, there are few vendors that have sufficient resources, capabilities and experience to carry out the design and delivering of a nuclear power plant in the international market; On the other hand, the licensing processes are strictly dependent on national law frameworks, and on the nuclear policies. The paper proposes a comparison of six licensing processes (the ones established in Finland, France, Italy, South Korea, USA and UK), and analyzes its main features and implications; the IAEA licensing process is taken as reference point. The objective of the paper is to propose a systemic approach for considering the licensing procedures. The framework proposed enables facilitating the licensing management and inferring the main features of licensing contexts. The paper concludes with a forecast of the nuclear licensing context, especially with respect to the fourth generation of nuclear reactors. (author)

  8. Exporting the Canadian licensing program

    International Nuclear Information System (INIS)

    Whelan, D.J.

    1981-06-01

    This paper deals with the problems of an overseas regulatory agency in licensing a Canadian-supplied nuclear plant which is referenced to a plant in Canada. Firstly, the general problems associated with the use of a reference plant are discussed. This is followed by a discussion of specific problems which arise from the licensing practices in Canada. The paper concludes with recommendations to simplify the task of demonstrating the licensability of an overseas CANDU plant

  9. 7 CFR 6.32 - Globalization of licenses.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Globalization of licenses. 6.32 Section 6.32 Agriculture Office of the Secretary of Agriculture IMPORT QUOTAS AND FEES Dairy Tariff-Rate Import Quota Licensing § 6.32 Globalization of licenses. If the Licensing Authority determines that entries of an article...

  10. 42 CFR 431.710 - Provisional licenses.

    Science.gov (United States)

    2010-10-01

    ... Licensing Nursing Home Administrators § 431.710 Provisional licenses. To fill a position of nursing home... 42 Public Health 4 2010-10-01 2010-10-01 false Provisional licenses. 431.710 Section 431.710 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  11. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  12. Nuclear facilities licensing

    International Nuclear Information System (INIS)

    Carvalho, A.J.M. de.

    1978-01-01

    The need for the adoption of a legal and normative system, defining objectives, pescriptions and the process of nuclear licensing and building of nuclear power plants in Brazil is enphasized. General rules for the development of this system are presented. The Brazilian rules on the matter are discussed. A general view of the German legal system for nuclear power plant licensing and the IAEA recommendations on the subject are finally presented. (A.L.S.L.) [pt

  13. To License or Not to License: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    Directory of Open Access Journals (Sweden)

    Thomas Lonardo

    2008-09-01

    Full Text Available In this paper the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner licensing. The authors conclude that states must differentiate between Private Investigator and Digital Examiner licensing requirements and oversight.

  14. China’s Relations with Portuguese-speaking Countries: A Growing but Unnoticed Relation

    Science.gov (United States)

    2012-09-01

    Brazil and China Expand Satellite Program and African Countries Receive data from CBERS) Ministerio da Ciencia e Tecnologia do Brasil (Brazilian Ministry...Washington D.C. Ministerio da Ciencia e Tecnologia do Brasil (Brazilian Ministry of Science and Technology). “Brasil e China Ampliao Base do Programa CBERS

  15. Radioactive liquid waste discharged from Nuclear Electric licensed sites during 1991

    International Nuclear Information System (INIS)

    Austin, L.S.; Odell, K.J.

    1993-03-01

    This report presents the detailed isotopic composition of radioactive liquid waste discharged from Nuclear Electric licensed sites in 1991. Liquid discharges from those Magnox stations using pond storage of irradiated fuel contained low levels of activation and fission products, while those from Wylfa and the AGR stations contained lower levels of activation products with only traces of fission products. Discharges were similar to those observed in previous years, with any changes concordant with changes in stations' generation performance. (author)

  16. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  17. 77 FR 71404 - Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially...

    Science.gov (United States)

    2012-11-30

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent to License Government-Owned Inventions; Intent to License on a Partially-Exclusive Basis AGENCY: Department of the Army, DoD. ACTION... by the Secretary of the Army. The US Army Edgewood Chemical Biological Center intends to license...

  18. Licensing of ''grandfather's'' facilities: Ukrainian experience

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Bogdan, L.; Steinberg, N.

    1995-01-01

    In the former USSR, unlike most countries, radioactive waste management activities including waste disposal needed no license. But after the USSR breakdown the Ukrainian Parliament -- Verkhovna Rada -- invoked the revised Law on Business activities. According to Article 4 of the Law, in order to treat or to dispose radioactive waste every enterprise has to get a special permission or license. In compliance with the Law, the Cabinet of Ministers by its Ordinance of January 13, 1993, authorized the Ukrainian State Committee for Nuclear and Radiation Safety (UkrSCNRS) to issue special permissions or licenses for waste treatment and disposal. And that requirement was valid not only for future activities but also for existing facilities in operation. Taking into account the undergoing legislative process, SCNRS began to develop its licensing process without waiting for the special nuclear laws to be passed. On the basis of the legislation already in effect, first of all the Law on Enterprises (full responsibility of enterprises for their activities) and Law on Business activities (requirement to have a license for special types of activities), the newly formed national regulatory body had to identify all the enterprises that needed to be licensed, to establish relevant procedures, to develop related regulatory documents, to implement these procedures and documents at operating enterprises, and for each case to make a decision concerning feasibility of issuing a license, period of validity and license conditions

  19. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  20. 10 CFR 781.51 - Nonexclusive licenses.

    Science.gov (United States)

    2010-01-01

    ... corporate structure of which licensee is a part, if any. However, the license shall not be assignable or... license upon the policies of the United States Government; (3) The effect of the license upon domestic and... extent of U.S. Government contribution to the development of the invention; (iv) The degree of...

  1. 7 CFR 6.33 - License fee.

    Science.gov (United States)

    2010-01-01

    ... certified mail, return receipt requested, advising the licensee that if payment is not mailed in accordance.... Where the license at issue is a historical license, this will result, pursuant to § 6.23(b), in the person's loss of historical eligibility for such license. (d) Licensees may elect not to accept certain...

  2. 25 CFR 11.601 - Marriage licenses.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Marriage licenses. 11.601 Section 11.601 Indians BUREAU... ORDER CODE Domestic Relations § 11.601 Marriage licenses. A marriage license shall be issued by the clerk of the court in the absence of any showing that the proposed marriage would be invalid under any...

  3. Location, location, location: Assessing the spatial patterning between marijuana licenses, alcohol outlets and neighborhood characteristics within Washington state.

    Science.gov (United States)

    Tabb, Loni Philip; Fillmore, Christina; Melly, Steven

    2018-04-01

    The availability of marijuana products is becoming increasingly prevalent across the United States (US), many states are allowing for the production, processing, and retailing of these products for medical and/or recreational use. The purpose of this study is to: (1) examine the spatial patterning of marijuana licenses, and (2) examine the impact of alcohol outlets in addition to other neighborhood characteristics on marijuana licenses within the state of Washington. This cross-sectional observational study examined 1458 census tracts in Washington state from 2017, using marijuana and alcohol data from the Washington State Liquor and Cannabis Board as well as neighborhood characteristics data from the American Community Survey 2011-2015 5-year estimates. We used exploratory and formal spatial regression methods, including integrated nested Laplace approximation within a Bayesian statistical framework, to address the study aims. Our results indicate there is significant spatial patterning of marijuana producers and processors across the state. We also found that all marijuana licenses are located in poorer census tracts, and marijuana retailers are co-located in census tracts with off-premises alcohol outlets. Our study provides empirical evidence of the relationship between marijuana licenses, alcohol outlets, and neighborhood characteristics, and has important implications for policymakers in other states currently considering legalizing marijuana-products for medical and/or recreational use. Copyright © 2018 Elsevier B.V. All rights reserved.

  4. The optimal licensing contract in a differentiated Stackelberg model.

    Science.gov (United States)

    Hong, Xianpei; Yang, Lijun; Zhang, Huaige; Zhao, Dan

    2014-01-01

    This paper extends the work of Wang (2002) by considering a differentiated Stackelberg model, when the leader firm is an inside innovator and licenses its new technology by three options, that is, fixed-fee licensing, royalty licensing, and two-part tariff licensing. The main contributions and conclusions of this paper are threefold. First of all, this paper derives a very different result from Wang (2002). We show that, with a nondrastic innovation, royalty licensing is always better than fixed-fee licensing for the innovator; with a drastic innovation, royalty licensing is superior to fixed-fee licensing for small values of substitution coefficient d; however when d becomes closer to 1, neither fee nor royalty licensing will occur. Secondly, this paper shows that the innovator is always better off in case of two-part tariff licensing than fixed-fee licensing no matter what the innovation size is. Thirdly, the innovator always prefers to license its nondrastic innovation by means of a two-part tariff instead of licensing by means of a royalty; however, with a drastic innovation, the optimal licensing strategy can be either a two-part tariff or a royalty, depending upon the differentiation of the goods.

  5. 7 CFR 51.52 - Licensing and identification of certain official devices.

    Science.gov (United States)

    2010-01-01

    ... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 FRESH FRUITS, VEGETABLES AND OTHER PRODUCTS 1,2... similar aid under such terms and conditions as may be specified by the Administrator. Licenses shall be...

  6. AVC/H.264 patent portfolio license

    Science.gov (United States)

    Skandalis, Dean A.

    2006-08-01

    MPEG LA, LLC offers a joint patent license for the AVC (a/k/a H.264) Standard (ISO/IEC IS 14496-10:2004). Like MPEG LA's other licenses, the AVC Patent Portfolio License is offered for the convenience of the marketplace as an alternative enabling users to access essential intellectual property owned by many patent holders under a single license rather than negotiating licenses with each of them individually. The AVC Patent Portfolio License includes essential patents owned by DAEWOO Electronics Corporation; Electronics and Telecommunications Research Institute (ETRI); France Telecom, societe anonyme; Fujitsu Limited; Hitachi, Ltd.; Koninklijke Philips Electronics N.V.; LG Electronics Inc.; Matsushita Electric Industrial Co., Ltd.; Microsoft Corporation; Mitsubishi Electric Corporation; Robert Bosch GmbH; Samsung Electronics Co., Ltd.; Sedna Patent Services, LLC; Sharp Kabushiki Kaisha; Siemens AG; Sony Corporation; The Trustees of Columbia University in the City of New York; Toshiba Corporation; UB Video Inc.; and Victor Company of Japan, Limited. Another is expected also to join as of August 1, 2006. MPEG LA's objective is to provide worldwide access to as much AVC essential intellectual property as possible for the benefit of AVC users. Therefore, any party that believes it has essential patents is welcome to submit them for evaluation of their essentiality and inclusion in the License if found essential.

  7. Algeria schedules onshore licensing round

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Algeria's Sonatrach will conduct its first international onshore exploration licensing round in a move designed to triple drilling activity in the country. A second round will follow next April. Sonatrach plans to drill 200 wells during 1991-95, which will require the current level of 37/year to be almost trebled toward the end of the period. To this end foreign operators are being courted in an open exploration bidding round. Deadline for bid submittal in Nov. 30. Companies may enter singly or in groups to form partnerships with Sonatrach. Foreign licensees will be able to take a maximum 49% of production under Algerian law

  8. The Optimal Licensing Contract in a Differentiated Stackelberg Model

    Directory of Open Access Journals (Sweden)

    Xianpei Hong

    2014-01-01

    Full Text Available This paper extends the work of Wang (2002 by considering a differentiated Stackelberg model, when the leader firm is an inside innovator and licenses its new technology by three options, that is, fixed-fee licensing, royalty licensing, and two-part tariff licensing. The main contributions and conclusions of this paper are threefold. First of all, this paper derives a very different result from Wang (2002. We show that, with a nondrastic innovation, royalty licensing is always better than fixed-fee licensing for the innovator; with a drastic innovation, royalty licensing is superior to fixed-fee licensing for small values of substitution coefficient d; however when d becomes closer to 1, neither fee nor royalty licensing will occur. Secondly, this paper shows that the innovator is always better off in case of two-part tariff licensing than fixed-fee licensing no matter what the innovation size is. Thirdly, the innovator always prefers to license its nondrastic innovation by means of a two-part tariff instead of licensing by means of a royalty; however, with a drastic innovation, the optimal licensing strategy can be either a two-part tariff or a royalty, depending upon the differentiation of the goods.

  9. Licensing and advanced fuel designs

    International Nuclear Information System (INIS)

    Davidson, S.L.; Novendstern, E.H.

    1991-01-01

    For the past 15 years, Westinghouse has been actively involved in the development and licensing of fuel designs that contain major advanced features. These designs include the optimized fuel assembly, The VANTAGE 5 fuel assembly, the VANTAGE 5H, and most recently the VANTAGE+ fuel assembly. Each of these designs was supported by extensive experimental data, safety evaluations, and design efforts and required intensive interaction with the US Nuclear Regulatory Commission (NRC) during the review and approval process. This paper presents a description of the licensing approach and how it was utilized by the utilities to facilitate the licensing applications of the advanced fuel designs for their plants. The licensing approach described in this paper has been successfully applied to four major advanced fuel design changes ∼40 plant-specific applications, and >350 cycle-specific reloads in the past 15 years

  10. Nuclear licensing in Slovenia

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.; Vojnovic, D.; Pristavec, M.

    1998-01-01

    The article presents the approach to nuclear licensing in Slovenia. The paper describes, the initialization, internal authorization and review process in the Krsko NPP. The overall process includes preparation, internal independent evaluation, the Krsko Operating Committee and the Krsko Safety Committee review and internal approval. In addition, the continuation of the licensing process is discussed which includes independent evaluation by an authorized institution and a regulatory body approval process. This regulatory body approval process includes official hearing of the licensee, communication with the licensee, and final issuance of a license amendment. The internal evaluation, which follows the methodology of US NRC (defined in 10 CFR 50.59 and NUMARC 125) is described. This concept is partially implemented in domestic legislation.(author)

  11. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  12. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  13. Uso de imagens orbitais como base de dados para projetos de reforma agrária The use of orbital images as subsidies to agrarian reform projects

    Directory of Open Access Journals (Sweden)

    Marina de Fátima Vilela

    2005-08-01

    Full Text Available Análises técnica e econômica foram realizadas em imagens dos sensores IKONOS, TM/Landsat 5, ETM+/Landsat 7 e CCD/CBERS, objetivando a verificação da viabilidade destas como base de dados em projetos de reforma agrária. Essas análises efetuadas e a situação de mercado indicaram que a imagem IKONOS apresenta excelente desempenho técnico, mas o custo de aquisição inviabiliza sua utilização como base de dados para a reforma agrária. A imagem do Landsat 7, com baixo custo de aquisição, apresentou grande viabilidade técnica para fins de reforma agrária. No entanto, a perda do contato com a plataforma Landsat 7 inviabilizou a compra de novas imagens do sensor ETM+. A imagem CCD/CBERS apresentou a segunda maior similaridade com a verdade de campo e o menor índice Kappa para a classificação. Apesar do baixo índice de exatidão para a classificação, as análises de custo, o lançamento do CBERS-2 e a possibilidade de correção dos problemas de radiometria podem tornar as imagens da plataforma CBERS-2 concorrentes de peso no mercado e, ainda, preencher a lacuna deixada pela perda do Landsat 7. A imagem do Landsat 5 apresentou o mais baixo desempenho técnico nas análises efetuadas. Entretanto, seu potencial como base de dados é amplamente reconhecido pelo INCRA, que ainda utiliza tais imagens. O declínio da vida útil do Landsat-5 atribui mais importância ao lançamento do CBERS-2.Technical and economical analyses were performed on IKONOS, Landsat TM 5 and Landsat ETM+ 7 and CCD/CBERS data in order to verify their feasibilities to subsidy agrarian reform projects. Results showed that IKONOS data presented excellent technical viability but its high cost prevents its use. Landsat ETM+ 7 data, with low cost, presented good technical viability, however due to the problems occurring in the satellite operation, its use was also prevented . CCD/CBERS data presented the second best similarity with the ground truth data, although it

  14. Vertical integration and the licensing of innovation with a fixed fee or a royalty

    OpenAIRE

    Lemarié, S.

    2005-01-01

    In this paper, we analyse a situation where a patent holder is considered as an upstream firm that can license its innovation to some downstream companies that compete on a final market with differentiated products. Licensing contract may be based either on a royalty or a fixed fee. The patent holder can either be independant or vertically integrated with one of the downstream companies. We show that a licence based on a royalty works better with vertical integration, and that consequently, t...

  15. 7 CFR 56.10 - Who may be licensed and authorized.

    Science.gov (United States)

    2010-01-01

    ... person to act as a “quality assurance inspector” in the packaging and grade labeling of products. No... (CONTINUED) VOLUNTARY GRADING OF SHELL EGGS Grading of Shell Eggs Licensed and Authorized Graders § 56.10 Who... determined by an examination for competency and who is to perform grading service under this part, may be...

  16. Changing mobility patterns and road mortality among pre-license teens in a late licensing country : an epidemiological study.

    NARCIS (Netherlands)

    Twisk, D.A.M. Bos, N.M. Shope, J.T. & Kok, G.

    2013-01-01

    Whereas the safety of teens in early licensing countries has been extensively studied, little is known about the safety of pre-license teens in late licensing countries, where these teens also may be at risk. This risk exists because of the combination of a) increasing use of travel modes with a

  17. 78 FR 17450 - Notice of Issuance of Materials License Renewal, Operating License SUA-1341, Uranium One USA, Inc...

    Science.gov (United States)

    2013-03-21

    ... License Renewal, Operating License SUA-1341, Uranium One USA, Inc., Willow Creek Uranium In Situ Recovery.... SUA- 1341 to Uranium One USA, Inc. (Uranium One) for its Willow Creek Uranium In Situ Recovery (ISR... Commission License No. SUA-1341 For Uranium One USA, Inc., Irigaray and Christensen Ranch Projects (Willow...

  18. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Science.gov (United States)

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  19. The USNCR license renewal process

    International Nuclear Information System (INIS)

    Kuo, Pao-Tsin

    2002-01-01

    The US Congress promulgated a law in 1954, entitled 'Atomic Energy Act'. This Act states that operating licenses for commercial nuclear power plants are limited to a fixed term of 40 years, but they may be renewed for a period not to exceed 20 years. The terms were established mainly for economic considerations, not based on technical limitations. The U.S. Nuclear Regulatory Commission (USNRC) published the license renewal rule, Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), in December, 1991. The rule has since been amended in May, 1995. The underlying principle of the rule is that the regulatory process is adequate for ensuring safety of operating plants. The regulatory process includes NRC's issuance of Orders, Bulletins, Generic Letters, and Information Notices, as well as a number of special inspections in addition to the continuous oversight and routine inspection activities performed by on-site inspectors. Because of this comprehensive regulatory process, compilation of the current license basis or re-verification of the current licensing basis is not considered necessary for a license renewal review. The USNRC also determined on the basis of the findings of its research programs that active structures and components are well maintained by the existing programs. Therefore, the focus of the license renewal review is on passive, long-lived structures and components and on time-limited ageing analyses. The time-limited ageing analyses are for those structures and components which were originally designed to a 40 year service life

  20. Dry spent fuel storage licensing

    International Nuclear Information System (INIS)

    Sturz, F.C.

    1995-01-01

    In the US, at-reactor-site dry spent fuel storage in independent spent fuel storage installations (ISFSI) has become the principal option for utilities needing storage capacity outside of the reactor spent fuel pools. Delays in the geologic repository operational date at or beyond 2010, and the increasing uncertainty of the US Department of Energy's (DOE) being able to site and license a Monitored Retrievable Storage (MRS) facility by 1998 make at-reactor-site dry storage of spent nuclear fuel increasingly desirable to utilities and DOE to meet the need for additional spent fuel storage capacity until disposal, in a repository, is available. The past year has been another busy year for dry spent fuel storage licensing. The licensing staff has been reviewing 7 applications and 12 amendment requests, as well as participating in inspection-related activities. The authors have licensed, on a site-specific basis, a variety of dry technologies (cask, module, and vault). By using certified designs, site-specific licensing is no longer required. Another new cask has been certified. They have received one new application for cask certification and two amendments to a certified cask design. As they stand on the brink of receiving multiple applications from DOE for the MPC, they are preparing to meet the needs of this national program. With the range of technical and licensing options available to utilities, the authors believe that utilities can meet their need for additional spent fuel storage capacity for essentially all reactor sites through the next decade

  1. A meta-analytic review of moral licensing.

    Science.gov (United States)

    Blanken, Irene; van de Ven, Niels; Zeelenberg, Marcel

    2015-04-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397 participants) that compare a licensing condition with a control condition. Based on this analysis, the magnitude of the moral licensing effect is estimated to be a Cohen's d of 0.31. We tested potential moderators and found that published studies tend to have larger moral licensing effects than unpublished studies. We found no empirical evidence for other moderators that were theorized to be of importance. The effect size estimate implies that studies require many more participants to draw solid conclusions about moral licensing and its possible moderators. © 2015 by the Society for Personality and Social Psychology, Inc.

  2. PBMR-SA licensing project organization

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Metcalf, P.E.; Mysen, A.

    2001-01-01

    The South African nuclear regulatory authority, the Council for Nuclear Safety (CNS), is beginning the safety review of the Pebble Bed Modular Reactor (PBMR) design under development by the South African National Electrical Utility, Eskom. This paper describes the CNS licensing process, including the establishment of basic licensing criteria, general design criteria, and specific design rules, as well the safety assessment to be conducted in accordance with the established structure. It also summarises the CNS PBMR review project activities, including the overall organisational arrangements, licensing basis, safety and risk assessment, general operating rules and plant design engineering, and pre-operational testing. (author)

  3. Environmental licensing issues for cogeneration plants

    International Nuclear Information System (INIS)

    Lipka, G.S.; Bibbo, R.V.

    1990-01-01

    The siting and licensing of cogeneration and independent power production (IPP) facilities is a complex process involving a number of interrelated engineering, economic, and environmental impact considerations. Important considerations for the siting and licensing of such facilities include air quality control and air quality impacts, water supply and wastewater disposal, and applicable noise criteria and noise impact considerations. Air quality control and air quality impact considerations for power generation facilities are commonly reviewed in the public forum, and most project developers are generally aware of the key air quality licensing issues. These issues include Best Available Control Technology (BACT) demonstration requirements, and air quality modeling requirements. BACT is a case-by-case determination, which causes uncertainty, in that developers have difficulty in projecting the cost of required control systems. Continuing developments in control technology may cause this problem to continue in the 1990's. Air quality modeling can be a problem in hilly terrain or within or near an urban environment, which could delay or preclude permitting of a new cogeneration or IPP facility in such locations. This paper discusses several environmental issues which are less frequently addressed than air quality issues, namely water/wastewater and noise. The design features of typical cogeneration and IPP facilities that affect water supply requirements, wastewater volumes, and noise emissions are discussed. Then, the site selection and impact review process are examined to identify typical constraints and trade-offs that can develop relative to water, wastewater, and noise issues. Trends in permit review requirements for water, wastewater, and noise are examined. Finally, innovative approaches that can be used to resolve potential development constraints for water, wastewater, and noise issues are discussed

  4. Licensing reform in the USA

    International Nuclear Information System (INIS)

    1991-01-01

    The licensing process for nuclear power plants in the USA is currently in two distinct stages: the issuance of a construction permit followed later by the issuance of an operation license. The ''two-step'' process has come under heavy criticism from the U.S. nuclear industry on the grounds that it causes uncertainty and delays and therefore inhibits new commitments to nuclear power plants. In 1989 the NRC published new regulations for the licensing of nuclear power plants which provide for the issuance of early site permits, safety certifications of standard designs, and combined construction permits and operating licences. The new rule was challenged by intervenors representing antinuclear groups who filed a legal challenge seeking to have the rule set aside on the grounds that it violates the Atomic Energy Act which they allege makes two-step licensing mandatory. In November 1990 the US Court of Appeals upheld the NRC's authority to issue combined licenses. An appeal for a rehearing has been filed. The paper analyses the events and the possible consequences of an adverse court decision. It reviews the options open to the NRC and industry if the court decision is upheld. The possibility of congressional action to amend the Atomic Energy Act is discussed. (author)

  5. An introduction to intellectual property licensing for technology companies

    Science.gov (United States)

    Meier, Lawrence H.

    2001-05-01

    Intellectual property licensing is an important issue facing all technology companies. Before entering into license agreements a number of issues need to be addressed, including invention ownership, obtaining and identifying licensable subject matter, and developing a licensing strategy. There are a number of important provisions that are included in most intellectual property license agreements. These provisions include definitions, the license grant, consideration, audit rights confidentiality, warranties, indemnification, and limitation of liability. Special licensing considerations exist relative to each type of intellectual property, and when the other party is a foreign company or a university.

  6. 75 FR 55799 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-09-14

    ... licensing. Licensing Contact: Patrick P. McCue, PhD, (301) 435-5560; [email protected] . Collaborative... Reference No. E-051-2010/0-US-01). Licensing Status: Available for licensing. Licensing Contact: Patrick P... for the brain tumors or brain cancers indentified as gliomas, glioblastomas, or astrocytomas. This...

  7. 77 FR 47393 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2012-08-08

    ...: Voluntary surrender of license. License No.: 12454N. Name: Federation Exports-Imports Inc. Address: 747...: Natco International Transports USA, L.L.C. Address: 12415 SW 136th Avenue, Bay 4, Miami, FL 33186 Date...: Voluntary surrender of license. License No.: 022773F. Name: WLI (USA) Inc. Address: 175-01 Rockaway Blvd...

  8. When does inward technology licensing facilitate firms' NPD performance? A contingency perspective

    DEFF Research Database (Denmark)

    Wang, Yuandi; Li-Ying, Jason

    2014-01-01

    Many firms find inward technology licensing (ITL), as a means to access external technological knowledge, an effective and relatively inexpensive way for new product development (NPD). However, although the literature has suggested some advantages and disadvantages of ITL with respect to NPD...

  9. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  10. License protection with a tamper-resistant token

    NARCIS (Netherlands)

    Chong, C.N.; Ren, Bin; Doumen, J.M.; Etalle, Sandro; Hartel, Pieter H.; Corin, R.J.; Lim, Chae Hoon; Yung, Moti

    Content protection mechanisms are intended to enforce the usage rights on the content. These usage rights are carried by a license. Sometimes, a license even carries the key that is used to unlock the protected content. Unfortunately, license protection is difficult, yet it is important for digital

  11. CHOOSING THE RIGHT FORM OF LICENSING A BUSINESS IN ROMANIA

    Directory of Open Access Journals (Sweden)

    ROIBAN Roxana Nadina

    2012-12-01

    Full Text Available Choosing the most appropriate form of licensing a business is an important decision not easy to be made by an entrepreneur and it should be taken only after he has the required skills and abilities to do so. The business idea should harmonize with the business environment and its future trends, with the existing opportunities and the future products or services that the company will provide and not least the entrepreneur has to make sure that he has sufficient resources to get started. We consider that every business has a number of features that make certain forms of licensing to be more suitable than others. This paper aims to present a multitude of items to be reviewed by an entrepreneur at the start-up in order to choose the most appropriate licensing type for his business. Given that our country's law allows entrepreneurs to license their businesses in several forms, the decision to choose between many existing possibilities is a very important one for the future good of the business. Currently in our country there are two major laws governing the licensing of a business. The first one is the republished and subsequently amended Company Law number 31/1990 and the second, the Government Emergency Ordinance number 44/2008 regarding the economic activities of the Sole traders, Individual enterprises and Family enterprises. The Company Law number 31/1990 allows companies to choose between one of the five types of business entities that can operate in Romania: General partnership (in Romanian SNC, Limited partnership (in Romanian SCS, Limited partnerships by shares (in Romanian SCA, Joint stock company (in Romanian S.A. and Limited liability company (in Romanian S.R.L.. GEO number 44/2008 on economic activities of the Sole traders, Individual enterprises and Family enterprises regulates the licensing and the activity of a Sole traders, Individual enterprises and Family enterprises.

  12. Trends in CANDU licensing

    International Nuclear Information System (INIS)

    Snell, V.G.; Grant, S.D.

    1997-01-01

    Modern utilities view nuclear power more and more as a commodity - it must compete 'today' with current alternatives to attract their investment. With its long construction times and large capital investment, nuclear plants are vulnerable to delays once they have been committed. There are two related issues. Where the purchaser and the regulator are experienced in CANDU, the thrust is a very practical one: to identify and resolve major licensing risks at a very early stage in the project. Thus for a Canadian project, the designer (AECL) and the prospective purchaser would deal directly with the AECB. However CANDU has also been successfully licensed in other countries, including Korea, Romania, Argentina, India and Pakistan. Each of these countries has its own regulatory agency responsible for licensing the plant. In addition, however, the foreign customer and regulator may seek input from the AECB, up to and including a statement of licensability in Canada; this is not normally needed for a ''repeat'' plant and/or if the customer is experienced in CANDU, but can be requested if the plant configuration has been modified significantly from an already-operating CANDU. It is thus the responsibility of the designer to initiate early discussions with the AECB so the foreign CANDU meets the expectations of its customers

  13. 47 CFR 97.5 - Station license required.

    Science.gov (United States)

    2010-10-01

    .... (3) A military recreation station license grant. A military recreation station license grant may be... States military recreational premises where the station is situated. The person must not be a... the balance of the license term and the suspension is still in effect, suspended for the balance of...

  14. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  15. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  16. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power license renewal in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. (author)

  17. 76 FR 31307 - Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively

    Science.gov (United States)

    2011-05-31

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The... Army. The US Army Edgewood Chemical Biological Center and the US Army Research Laboratory intend to...

  18. 9 CFR 2.6 - Annual license fees.

    Science.gov (United States)

    2010-01-01

    ... method used to calculate the license fee. All initial license and changed class of license fees must be... research facilities, dealers, exhibitors, retail pet stores, and persons for use as pets, directly or through an auction sale, by the dealer or applicant during his or her preceding business year (calendar or...

  19. When does inward technology licensing facilitate firms’ NPD performance? Evidence from China

    DEFF Research Database (Denmark)

    Li-Ying, Jason; Wang, Yuandi; Salomo, Søren

    2013-01-01

    Increasingly, many firms have found inward technology licensing a relatively quick and inexpensive way for new product development (NPD) as compared to internal R&D started. Although the literature on NPD has suggested some advantages and disadvantages regarding NPD by means of inward technology ...

  20. May compact storage facilities be licensed

    International Nuclear Information System (INIS)

    Gleim, A.; Winter, G.

    1980-01-01

    The authors examine as potential statements fo fact for licensing so-called compact storage facilities for spent fuel elements Sec. 6 to 9c of the German Atomic Energy Act and Sec. 4 of the German Radiation Protection Ordinance. They find that none of these provisions were applicable to compact stroage facilities. In particular, the storage of spent fuel elements was no storage of nuclear fuels licensable under Sec. 6 of the Atomic Energy Act, because Sec. 6 did not cover spent fuel elements. Also in the other wording of the Atomic Energy Act there was no provision, which could be used as a statement of fact for licensing compact storage facilities. Such facilities could not be licensed and, for that reason, were not permitted. (IVR) [de

  1. License Auctions with Royalty Contracts for (Winners and) Losers

    OpenAIRE

    Wolfstetter, Elmar; Giebe, Thomas

    2007-01-01

    This paper revisits the licensing of a non–drastic process innovation by an outside innovator to a Cournot oligopoly. We propose a new mechanism that combines a restrictive license auction with royalty licensing. This mechanism is more profitable than standard license auctions, auctioning royalty contracts, fixed–fee licensing, pure royalty licensing, and two-part tariffs. The key features are that royalty contracts are auctioned and that losers of the auction are granted the option to si...

  2. 76 FR 17840 - Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively

    Science.gov (United States)

    2011-03-31

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent To License Government-Owned Inventions; Intent To License Exclusively AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The... McGill telephone: 410-436-8467, [email protected]us.army.mil , U.S. Army Edgewood Chemical Biological Center...

  3. RM - ODP to express nuclear licensing

    International Nuclear Information System (INIS)

    Barbosa, E.A.; Martucci, M. Jr.

    2002-01-01

    The scope of CNEN (Comissao Nacional de Energia Nuclear) is established by standards and procedures, which allow one context where several activities for nuclear licensing are realized by persons, machines and other entities of real world and by software systems. The CNEN objectives for licensing nuclear installations can be specified and they define how the systems are consisted, its nature, and which important elements were considered relevant for its constitution. The behavior, where the software will be operated, was likely defined in this paper through all aspects of its business process, which means from its licensing context. The concepts and definition showed here defined one specifics business domain, through ODP context. The functionalities of nuclear licensing process, the relationship scope and the rules of interaction that contributed for to specify the nuclear licensing process were defined, too. Therefore, the definition of the domain follows the orientation of architecture concepts and allows to implement the reflection model, where, with the auxiliary from IDEF0 (Integration Definition for Function Modeling) diagrams, the interactions between extern domains were mapped

  4. Recent changes in UK legislation and the licensing of radiopharmacies

    Energy Technology Data Exchange (ETDEWEB)

    Monger, P N [Medicines Inspectorate, London (United Kingdom). Medicine Control Agency

    1992-06-01

    The implications of the recent loss of Crown Immunity to radiopharmacy in the NHS are reviewed. The options available are that the preparation of radiopharmaceuticals within a hospital will either be under the control of a pharmacist or be an activity licensed as 'Specials' manufacture. In the latter case requirements for inspection by the Medicines Control Agency, fees payable and the need for involvement of a pharmacist are reviewed. Requirements for the grant of a Specials Manufacturing Licence are presented in some detail. Reference is made to established and published sources of guidance, official and otherwise. Consideration is given to: staffing and personnel, open and closed procedures, environmental standards, handling of blood products, use of isolators, quality control and quality assurance, licensed and unlicensed materials, sterility testing, broth transfer tests, environmental monitoring and documentation. (author).

  5. License - Gclust Server | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Gclust Server License License to Use This Database Last updated : 2009/09/14 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  6. Procedural Aspects of Compulsory Licensing Under TRIPS

    DEFF Research Database (Denmark)

    Wested, Jakob; Minssen, Timo

    2017-01-01

    and discussion addressed the framework and context for CL provided by the TRIPS convention. Both the specific requirements enshrined in TRIPS art 31 and the broader objectives and principles enshrined in TRIPS, e.g. transfer and dissemination of technology (art 7), protection of public health (art 8......In 2013, Indian authorities granted a compulsory license to NATCO Pharmaceuticals for a patented pharmaceutical product sold by Bayer. This decision raised several complex issues regarding the grant a CL and their consistency with the principles and objectives of TRIPS. Furthermore, in January 2017...

  7. Conceptual Design of On-line Based Licensing Review and Assesment System of Nuclear Installations and Nuclear Materials ('PRIBEN')

    International Nuclear Information System (INIS)

    Melani, Ai; Chang, Soon Heung

    2008-01-01

    At the present Indonesia has no nuclear power plant in operation yet, although it is expected that the first nuclear power plant will be operated and commercially available in around the year of 2016 to 2017 in Muria Peninsula. There are only three research reactors, one nuclear fuel fabrication plant for research reactors, and one experimental fuel fabrication plant for nuclear power, one isotope production facility and some other research facilities. All the facility is under Nuclear Energy Regulatory Agency (BAPETEN) controlling through regulation, licensing and inspection. The organizations operation submits licensing application to BAPETEN before utilizing the facility. According to the regulation before BAPETEN give license they perform review and assessment for the utility application. Based on the review and assessment result, BAPETEN may stipulate, reject, delay or terminate the license. In anticipation of expansion of the nuclear program in Indonesia, BAPETEN should have an integrated and updated system for review and asses the licensing application. For this reason, an expert system for the review and asses the licensing application, so-called PRIBEN (Perizinan Reaktor, Instalasi dan Bahan Nuklir/Licensing of Reactor, Nuclear Installations and Nuclear Materials), is developed which runs on the online-based reality environment

  8. International assistance. Licensing assistance project

    International Nuclear Information System (INIS)

    Aleev, A.

    1999-01-01

    Description of licensing assistance project for VATESI is presented. In licensing of unit No.1 of INPP VATESI is supported by many western countries. Experts from regulatory bodies or scientific organizations of those countries assist VATESI staff in reviewing documentation presented by INPP. Among bilateral cooperation support is provided by European Commission through Phare programme

  9. Normalization of NDVI from Different Sensor System using MODIS Products as Reference

    International Nuclear Information System (INIS)

    Wenxia, Gan; Liangpei, Zhang; Wei, Gong; Huanfeng, Shen

    2014-01-01

    Medium Resolution NDVI(Normalized Difference Vegetation Index) from different sensor systems such as Landsat, SPOT, ASTER, CBERS and HJ-1A/1B satellites provide detailed spatial information for studies of ecosystems, vegetation biophysics, and land cover. Limitation of sensor designs, cloud contamination, and sensor failure highlighted the need to normalize and integrate NDVI from multiple sensor system in order to create a consistent, long-term NDVI data set. In this paper, we used a reference-based method for NDVI normalization. And present an application of this approach which covert Landsat ETM+ NDVI calculated by digital number (NDVI DN ) to NDVI calculated by surface reflectance (NDVI SR ) using MODIS products as reference, and different cluster was treated differently. Result shows that this approach can produce NDVI with highly agreement to NDVI calculated by surface reflectance from physical approaches based on 6S (Second Simulation of the satellite Signal in the Solar Spectrum). Although some variability exists, the cluster specified reference based approach shows considerable potential for NDVI normalization. Therefore, NDVI products in MODIS era from different sources can be combined for time-series analysis, biophysical parameter retrievals, and other downstream analysis

  10. NRC licensing requirements: DOD options

    International Nuclear Information System (INIS)

    Pike, W.J.; O'Reilly, P.D.

    1982-09-01

    This report describes the licensing process (both safety and environmental) that would apply if the Department of Defense (DOD) chooses to obtain licenses from the US Nuclear Regulatory Commission (NRC) for using nuclear energy for power and luminous sources. The specific nuclear energy sources being considered include: small or medium-size nuclear power reactors; radioisotopic thermoelectric generators with 90 Sr or 238 Pu; radioisotopic dynamic electric generators with 90 Sr or 238 Pu; and applications of radioisotopes for luminous sources (lights) with 3 H, 85 Kr, or 147 Pm. The steps of the licensing process are summarized in the following sections, with particular attention given to the schedule and level of effort necessary to support the process

  11. Overview of the Yucca Mountain Licensing Process

    International Nuclear Information System (INIS)

    M. Wisenburg

    2004-01-01

    This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process

  12. IRIS pre-application licensing

    International Nuclear Information System (INIS)

    Carelli, Mario D.; Kling, Charles L.; Ritterbusch, Stanley E.

    2003-01-01

    This paper presents the approach to pre-application licensing by the International Reactor Innovative and Secure (IRIS), and advanced, integral reactor design with a thermal power of 1000 MW. The rationale for the pre-application licensing is discussed. Since IRIS technology is based on proven LWR experience, the project will rely on AP600/AP1000 precedent and will focus during the pre-application on long lead and novel items. A discussion of the evolution of the project to significantly reduce licensing issues is provided, followed by a summary of the IRIS safety-by-design which provides a formidable first step in the Defense in Depth approach. The effects of the safety-by-design, as well as of passive systems, on the IRIS safety will be investigated in a proposed testing program that will be reviewed by NRC during the pre-application. Documentation to be provided to NRC is discussed. Early design analyses indicate that the benefits of the IRIS safety-by-design approach are so significant that the basic premise of current emergency planning regulations (i.e., likelihood of core damage) will be reduced to the extent that special emergency response planning beyond the exclusion area boundary may not be needed. How this very significant outcome can be effected through a highly risk-informed licensing is discussed. (author)

  13. Teacher License Reciprocity. 50-State Review

    Science.gov (United States)

    Aragon, Stephanie

    2017-01-01

    This policy report defines and provides a 50-state review of teacher license reciprocity, explores how state-specific licensing requirements impact the teacher labor market, and includes examples of national and state efforts to facilitate reciprocity.

  14. Radioisotope thermoelectric generator licensed hardware package and certification tests

    International Nuclear Information System (INIS)

    Goldmann, L.H.; Averette, H.S.

    1994-01-01

    This paper presents the Licensed Hardware package and the Certification Test portions of the Radioisotope Thermoelectric Generator Transportation System. This package has been designed to meet those portions of the Code of Federal Regulations (10 CFR 71) relating to ''Type B'' shipments of radioactive materials. The detailed information for the anticipated license is presented in the safety analysis report for packaging, which is now in process and undergoing necessary reviews. As part of the licensing process, a full-size Certification Test Article unit, which has modifications slightly different than the Licensed Hardware or production shipping units, is used for testing. Dimensional checks of the Certification Test Article were made at the manufacturing facility. Leak testing and drop testing were done at the 300 Area of the US Department of Energy's Hanford Site near Richland, Washington. The hardware includes independent double containments to prevent the environmental spread of 238 Pu, impact limiting devices to protect portions of the package from impacts, and thermal insulation to protect the seal areas from excess heat during accident conditions. The package also features electronic feed-throughs to monitor the Radioisotope Thermoelectric Generator's temperature inside the containment during the shipment cycle. This package is designed to safely dissipate the typical 4500 thermal watts produced in the largest Radioisotope Thermoelectric Generators. The package also contains provisions to ensure leak tightness when radioactive materials, such as a Radioisotope Thermoelectric Generator for the Cassini Mission, planned for 1997 by the National Aeronautics and Space Administration, are being prepared for shipment. These provisions include test ports used in conjunction with helium mass spectrometers to determine seal leakage rates of each containment during the assembly process

  15. Electric energy production and environmental licensing: citizenship in Brazil in time of ecological crisis

    International Nuclear Information System (INIS)

    Bettencourt, Marcia Pires da Luz

    2017-01-01

    The choices of energy sources gain relevance in the face of the ecological crisis which has a central questioning on the modes of production and consumption and that stems from a system which changes everything into merchandise. On one hand, brazilian electricity generation has the advantage of using clean energy in great part of its composition, at least in discourse. On the other hand, though, there are high social and environmental costs, especially for communities living near the regions where projects for the electricity sector are built. This research aimed to identify and analyse different modes society takes part in the process of choosing energy sources for electricity generation in Brazil. It discusses the links between the ecological crisis and the production of electrical energy; how the institutional mechanisms for social participation on issues related to the production of electric power in Brazil work; and, how civil society participates in environmental licensing in the National Environment Council (CONAMA). A set of related approaches to the nature of the ecological crisis and the forms of social participation was adopted in the theoretical framework and an analysis of the electric sector panorama in Brazil has been drawn up. In order to investigate the forms society participates in issues related to the composition of the brazilian electricity matrix, the methodology comprised a documentary analysis and a case study. They included three categories of actors: (1) CONAMA's councilors, (2) experts from the Field; and (3) actors involved in the diagnosis study, planning and management of the electricity sector. The research identified inconsistencies, ambiguities and other relevant issues about the participation of society in the production of electrical energy. Such issues are related to: deficiencies in the mechanisms for information access; lack of transparency and patterns in internal documents; lack of social participation in the elaboration of

  16. NPP License Renewal and Aging Management: Revised Guidance

    International Nuclear Information System (INIS)

    Hull, A.B.; Hiser, A.L.; Lindo-Talin, S.E.

    2012-01-01

    Based on the Atomic Energy Act, the NRC issues licenses for commercial power reactors to operate for up to 40 years and allows these licenses to be renewed for up to another 20 years. NRC has approved license renewal (LR) for well over 50% of U.S. located reactors originally licensed to operate for 40 years. Of these 104 reactors (69 PWRs, 35 BWRs), the NRC has issued renewed licenses for 71 units and is currently reviewing applications for another 15 units. As of May 1, 2012, ten plants at nine sites had entered their 41st year of operation and thus are in their first period of extended operation (PEO). Five more plants will enter the PEO by the end of 2012. One foundation of the license renewal process has been license renewal guidance documents (LRGDs). The U.S. Nuclear Regulatory Commission (NRC) revised key guidance documents used for nuclear power LR in 2010 and 2011. These include NUREG-1800, 'Standard Review Plan for Review of License Renewal Applications,' revision 2 (SRP-LR), and NUREG-1801, 'Generic Aging Lessons Learned (GALL) Report,' revision 2 (GALL Report). The guidance documents were updated to reflect lessons learned and operating experience gained since the guidance documents were last issued in 2005. The reactor LRGDs referenced in this poster can all be accessed at http://www.nrc.gov/reactors/operating/licensing/renewal/guidance.html (author)

  17. Four Essays on Technology Licensing and Firm Innovation

    DEFF Research Database (Denmark)

    Moreira, Solon

    &D strategies. On the supply side, the existing literature has been focused on understanding how technology licensing can be used by firms as a mechanism to recover investments in innovative activities and to foster learning opportunities. On the demand side, it has been shown that licensing is an important...... source that firms can tap into to feed their internal needs for innovative knowledge. While several studies have examined technology licensing through the lens of the licensor, research on how firms rely on licensing contracts to acquire knowledge and improve their innovation performance still leaves......Licensing contracts represent one of the most widely used mechanisms to exchange technologies and transfer know-how between firms. Due to the opportunities that licensing creates for firms operating on both sides of the markets for technology, it has increasingly become an integral part of firms’ R...

  18. A review of tritium licensing requirements

    International Nuclear Information System (INIS)

    Meikle, A.B.

    1982-12-01

    Present Canadian regulations and anticipated changes to these regulations relevant to the utilization of tritium in fusion facilities and in commercial applications have been reviewed. It is concluded that there are no serious licensing obstacles, but there are a number of requirements which must be met. A license will be required from Atomic Energy Control Board if Ontario Hydro tritium is to be applied by other users. A license is required from the Federal Government to export or import tritium. A licensed container will be required for the storage and shipping of tritium. The containers being designed by AECL and Ontario Hydro and which are currently being tested will adequately store and ship all of the Ontario Hydro tritium but are unnecessarily large for the small quantities required by the commercial tritium users. Also, some users may prefer to receive tritium in gaseous form. An additional, smaller container should be considered. The licensing of overseas fusion facilities for the use of tritium is seen as a major undertaking offering opportunities to Canadian Fusion Fuels Technology Project to undertake health, safety and environmental analysis on behalf of these facilities

  19. Software licenses: Stay honest!

    CERN Multimedia

    Computer Security Team

    2012-01-01

    Do you recall our article about copyright violation in the last issue of the CERN Bulletin, “Music, videos and the risk for CERN”? Now let’s be more precise. “Violating copyright” not only means the illegal download of music and videos, it also applies to software packages and applications.   Users must respect proprietary rights in compliance with the CERN Computing Rules (OC5). Not having legitimately obtained a program or the required licenses to run that software is not a minor offense. It violates CERN rules and puts the Organization at risk! Vendors deserve credit and compensation. Therefore, make sure that you have the right to use their software. In other words, you have bought the software via legitimate channels and use a valid and honestly obtained license. This also applies to “Shareware” and software under open licenses, which might also come with a cost. Usually, only “Freeware” is complete...

  20. Discovering Software License Constraints : Identifying a Binary’s Sources by Tracing Build Processes

    NARCIS (Netherlands)

    Van der Burg, S.; Davies, J.; Dolstra, E.; German, D.M.; Hemel, A.

    2012-01-01

    With the current proliferation of open source software components, intellectual property in general, and copyright law in particular, has become a critical non-functional requirement for software systems. A key problem in license compliance engineering is that the legal constraints on a product

  1. Effectiveness of Oregon's teen licensing program : final report.

    Science.gov (United States)

    2008-06-01

    Significant changes in Oregons teen licensing laws went into effect on March 1, 2000. The new laws expanded the provisional driving license program which had been in effect since October 1989 and established a graduated driver licensing (GDL) prog...

  2. Assessment of the licensing aspects of HTGR in Yugoslavia

    International Nuclear Information System (INIS)

    Varazdinec, Z.

    1990-01-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  3. Assessment of the licensing aspects of HTGR in Yugoslavia

    Energy Technology Data Exchange (ETDEWEB)

    Varazdinec, Z [Institut za Elektroprivredu-Zagreb, Zagreb (Yugoslavia)

    1990-07-01

    This paper deals not only with the licensing procedure in Yugoslavia, but also reflects the Utility/Owner approach to the assessment of the licensability of the HTGR during the site selection process and especially during bid evaluation process. Besides the description of the existing procedure which was implemented on licensing of LWR program, the assessment of some licensing aspects of HTGR has been presented to describe possible implementation on licensing procedure. (author)

  4. 10 CFR 34.13 - Specific license for industrial radiography.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Specific license for industrial radiography. 34.13 Section 34.13 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY... industrial radiography. An application for a specific license for the use of licensed material in industrial...

  5. An ontology based trust verification of software license agreement

    Science.gov (United States)

    Lu, Wenhuan; Li, Xiaoqing; Gan, Zengqin; Wei, Jianguo

    2017-08-01

    When we install software or download software, there will show up so big mass document to state the rights and obligations, for which lots of person are not patient to read it or understand it. That would may make users feel distrust for the software. In this paper, we propose an ontology based verification for Software License Agreement. First of all, this work proposed an ontology model for domain of Software License Agreement. The domain ontology is constructed by proposed methodology according to copyright laws and 30 software license agreements. The License Ontology can act as a part of generalized copyright law knowledge model, and also can work as visualization of software licenses. Based on this proposed ontology, a software license oriented text summarization approach is proposed which performances showing that it can improve the accuracy of software licenses summarizing. Based on the summarization, the underline purpose of the software license can be explicitly explored for trust verification.

  6. Biosphere science news roundup. The Center for Biospheric Education and Research

    Science.gov (United States)

    Cotten, J H

    1994-01-01

    The Center for Biospheric Education and Research (CBER) is an exciting and truly unique addition to The Huntsville-Madison County Botanical Garden. The mission of CBER is to increase the knowledge and understanding of closed ecological life support systems, including both natural and man-made biospheres. Its primary emphasis will be on the Earth biosphere with particular attention to the role of plants in maintaining a balanced environment. Secondary emphasis will be on the space station and lunar habitation biospheres, both of which employ plants for environmental control, food, and aesthetics. CBER will serve as a catalyst providing both a forum and a facility for research, education, and display of methodologies and technologies relevant to the creation and maintenance of such biospheric systems.

  7. 48 CFR 252.227-7007 - License term-running royalty.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false License term-running... of Provisions And Clauses 252.227-7007 License term—running royalty. As prescribed at 227.7009-4(b), insert the following clause in patent releases, license agreements, and assignments: License Term—Running...

  8. License - AcEST | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us AcEST License to Use This Database Last updated : 2010/02/15 You may use this database in co...he Standard License specifies the license terms regarding the use of this database and the requirements you ...must follow in using this database. The Additional License specifies those items ... License The Standard License for this database is the license specified in the Creative Commons Attribution...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  9. 10 CFR 71.5 - Transportation of licensed material.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transportation of licensed material. 71.5 Section 71.5 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL General Provisions § 71.5 Transportation of licensed material. (a) Each licensee who transports licensed...

  10. Status of safety issues at licensed power plants

    International Nuclear Information System (INIS)

    1991-03-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program has been established whereby an annual NUREG series report will be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirement areas. The data contained in this report are a product of the NRC's Safety Issues Management System database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by personnel in the NRC regions. This report has been prepared in order to provide a comprehensive description of the implementation and verification status of all the TMI Action Plan requirements at licensed reactors, and to make this information available to other interested parties, including the public. A corollary purpose of this report is for it to serve as a follow-on to NUREG-0933, ''A Prioritization of Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed facilities

  11. Introduction to Technology Export License of Nuclear Facility

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Hana; Lee, Chansuh; Shin, Donghoon [Korea Institute of Nuclear Nonproliferation and Control, Daejeon (Korea, Republic of)

    2014-05-15

    In this regime, the Nuclear Safety and Security Commission (NSSC) has authority on final decision making. And the Korea Institute of Nuclear nonproliferation and Control (KINAC) has missions to review the classification and export licensing technically. In principle, classification and export licensing are applied and reviewed individually. However, the number of application for classification and licensing has increased geometrically in the last three years. This is largely a due to the contract that the Republic of Korea (ROK) has finalized to build the UAE Barakah Nuclear Power Plant (BNPP) and Jordan Research and Training Reactor (JRTR). This circumstance brought an administrative burden for the government and related institutes as well as stakeholders. This article introduces the law related to the 'Technology Export License of Nuclear Facility' which was developed and legislated to improve the efficiency and effectiveness of commodities classification and export licensing. This system could significantly reduce the licensing burden for transferring the technologies. However, the classification and license on this system are still requested when transferring the goods. Therefore, KINAC will continue to figure out the needs for the stakeholders and keep searching for solutions to problems inherent in the industry.

  12. Introduction to Technology Export License of Nuclear Facility

    International Nuclear Information System (INIS)

    Seo, Hana; Lee, Chansuh; Shin, Donghoon

    2014-01-01

    In this regime, the Nuclear Safety and Security Commission (NSSC) has authority on final decision making. And the Korea Institute of Nuclear nonproliferation and Control (KINAC) has missions to review the classification and export licensing technically. In principle, classification and export licensing are applied and reviewed individually. However, the number of application for classification and licensing has increased geometrically in the last three years. This is largely a due to the contract that the Republic of Korea (ROK) has finalized to build the UAE Barakah Nuclear Power Plant (BNPP) and Jordan Research and Training Reactor (JRTR). This circumstance brought an administrative burden for the government and related institutes as well as stakeholders. This article introduces the law related to the 'Technology Export License of Nuclear Facility' which was developed and legislated to improve the efficiency and effectiveness of commodities classification and export licensing. This system could significantly reduce the licensing burden for transferring the technologies. However, the classification and license on this system are still requested when transferring the goods. Therefore, KINAC will continue to figure out the needs for the stakeholders and keep searching for solutions to problems inherent in the industry

  13. Benchmark for license plate character segmentation

    Science.gov (United States)

    Gonçalves, Gabriel Resende; da Silva, Sirlene Pio Gomes; Menotti, David; Shwartz, William Robson

    2016-09-01

    Automatic license plate recognition (ALPR) has been the focus of many researches in the past years. In general, ALPR is divided into the following problems: detection of on-track vehicles, license plate detection, segmentation of license plate characters, and optical character recognition (OCR). Even though commercial solutions are available for controlled acquisition conditions, e.g., the entrance of a parking lot, ALPR is still an open problem when dealing with data acquired from uncontrolled environments, such as roads and highways when relying only on imaging sensors. Due to the multiple orientations and scales of the license plates captured by the camera, a very challenging task of the ALPR is the license plate character segmentation (LPCS) step, because its effectiveness is required to be (near) optimal to achieve a high recognition rate by the OCR. To tackle the LPCS problem, this work proposes a benchmark composed of a dataset designed to focus specifically on the character segmentation step of the ALPR within an evaluation protocol. Furthermore, we propose the Jaccard-centroid coefficient, an evaluation measure more suitable than the Jaccard coefficient regarding the location of the bounding box within the ground-truth annotation. The dataset is composed of 2000 Brazilian license plates consisting of 14000 alphanumeric symbols and their corresponding bounding box annotations. We also present a straightforward approach to perform LPCS efficiently. Finally, we provide an experimental evaluation for the dataset based on five LPCS approaches and demonstrate the importance of character segmentation for achieving an accurate OCR.

  14. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  15. Licensing safety critical software

    International Nuclear Information System (INIS)

    Archinoff, G.H.; Brown, R.A.

    1990-01-01

    Licensing difficulties with the shutdown system software at the Darlington Nuclear Generating Station contributed to delays in starting up the station. Even though the station has now been given approval by the Atomic Energy Control Board (AECB) to operate, the software issue has not disappeared - Ontario Hydro has been instructed by the AECB to redesign the software. This article attempts to explain why software based shutdown systems were chosen for Darlington, why there was so much difficulty licensing them, and what the implications are for other safety related software based applications

  16. 77 FR 59193 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-09-26

    ... Type: New OFF License. Bring Logistics US, Inc. (NVO & OFF), 4500 N. Sam Houston Parkway W., 130...: New NVO & OFF License. Contract Logistics, LLC (NVO & OFF), 4911 N. Portland Avenue, Suite 200.... Roush, Manager, Application Type: New NVO & OFF License. Crescent Line Inc. dba Globe Express Services...

  17. 25 CFR 558.4 - Granting a gaming license.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Granting a gaming license. 558.4 Section 558.4 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR GAMING LICENSES AND BACKGROUND INVESTIGATIONS FOR KEY EMPLOYEES AND PRIMARY MANAGEMENT OFFICIALS GAMING LICENSES FOR KEY EMPLOYEES AND PRIMARY...

  18. 75 FR 72824 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-26

    ... & OFF License. Everglory Logistics, Inc. (NVO & OFF), 440 McClellan Highway, 105F2, East Boston, MA..., Application Type: New NVO & OFF License. Hawaii Intermodal Tank Transport, LLC (NVO & OFF), 2350 S. Dock... Tran, Manager, Application Type: New NVO & OFF License. ITL USA Inc. dba International Transport...

  19. 78 FR 20107 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2013-04-03

    ... to maintain a valid bond. License No.: 016816F. Name: Green Integrated Logistics, Inc. Address: 16210... bond. License No.: 017054NF. Name: Asian Logistics, Inc. Address: 2079 South Atlantic Blvd., Suite D.... License No.: 020715N. Name: HI Trading International Corp. dba HI Transport International dba Shine...

  20. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    International Nuclear Information System (INIS)

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented

  1. Guide to the selection, training, and licensing or certification of reprocessing plant operators. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-06-01

    The Code of Federal Regulations, Title 10, Part 55, establishes procedures and criteria for the licensing of operators, including senior operators, in ''Production and Utilization Facilities'', which includes plants for reprocessing irradiated fuel. A training guide is presented which will facilitate the licensing of operators for nuclear reprocessing plants by offering generalized descriptions of the basic principles (theory) and the unit operations (mechanics) employed in reprocessing spent fuels. In the present volume, details about the portions of a training program that are of major interest to management are presented. (JSR)

  2. 32 CFR 643.126 - Transportation licenses.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Transportation licenses. 643.126 Section 643.126... ESTATE Additional Authority of Commanders § 643.126 Transportation licenses. Installation commanders are... free competitive proposals of all available companies or individuals. (b) DD Form 694 (Transportation...

  3. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM) in terms of socio-demographics, work profiles, and injury rates.

    Science.gov (United States)

    Calys-Tagoe, Benedict N L; Clarke, Edith; Robins, Thomas; Basu, Niladri

    2017-11-06

    Artisanal and small-scale gold mining (ASGM) represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention) as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months). Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events) and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73%) when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years) versus 5.0 (62 injuries in 1250 person-years) in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years) versus an un-licensed mine (6.1 per 100 person years). These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed site. The findings suggest that certain working

  4. Methodology to identify, review, and evaluate components for license renewal

    International Nuclear Information System (INIS)

    Carlson, D.D.; Gregor, F.E.; Walker, R.S.

    1988-01-01

    A methodology has been developed to systematically identify, review, and evaluate plant equipment for license renewal. The method builds upon the existing licensing basis, operating history, and accepted deterministic and probabilistic techniques. Use of these approaches provides a focus for license renewal upon those safety-significant systems and components that are not routinely replaced, refurbished, or subject to detailed inspection as part of the plant's existing test, maintenance, and surveillance programs. Application of the method identified the PWR and BWR systems that should be subjected to detailed license renewal review. Detailed examination of two example systems demonstrates the approach. The review and evaluation of plant equipment for license renewal differ from the initial licensing of the plant. A substantial operating history has been established, the licensing basis has evolved from the original one, and plant equipment has been subject to periodic maintenance and surveillance throughout its life. In consideration of these differences, a basis for license renewal is needed. License renewal should be based upon continuation of the existing licensing basis and recognition of existing programs and operating history

  5. Nuclear relevant installations licensing methodology in the Argentine Republic

    International Nuclear Information System (INIS)

    Paganini, C.E.

    1986-01-01

    A review of the requeriments of the Nuclear Installations Advisory Committee on Licensing (CALIN) from the nuclear security point of view, is presented. The methodology applied by the CALIN for the licensing in the Argentine Republic is included as well as codes, standards of applications and the interaction between the licensing Authority and the Responsible Entity during the whole process. Finally, the Atucha II nuclear power plant's licensing, in construction at present, is explained and the standard, of the licensing schedule, is presented graphically. (author) [es

  6. 48 CFR 1352.239-70 - Software license addendum.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Software license addendum... Software license addendum. As prescribed in 48 CFR 1339.107, insert the following clause: Software License....S.C. Section 516). (h) Renewal of Support after Expiration of this Award: Service will not...

  7. 76 FR 70145 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-11-10

    ...). Application Type: New NVO License. Alomar Transport, Inc. (NVO & OFF), 150-30 132nd Avenue, Suite 303, Jamaica... & OFF License. Forward System Logistics Inc. (NVO), 144-54 156th Street, Jamaica, NY 11434. Officers... NVO License. Green Line Shipping & Logistics Services Inc. (NVO & OFF), 16230 Lake View Lane, Apple...

  8. 76 FR 3635 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-01-20

    ... to maintain a valid bond. License Number: 004094F. Name: All Transport, Inc. Address: 8369 NW. 66th.... License Number: 020410F. Name: MBA Logistics, LLC. Address: 11455 Narin Drive, Brighton, MI 48114. Date... valid bonds. License Number: 021204NF. Name: United Logistics Corp. Address: 3650 Mansell Road, Suite...

  9. 76 FR 22106 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-04-20

    ...: Failed to maintain a valid bond. License Number: 018088N. Name: ILS-International Logistics Solutions... maintain a valid bond. License Number: 019369N. Name: Independent Transport Line, LLC dba ITL. Address... bond. License Number: 022322N. Name: O.T.S. Logistics, Inc. Address: 18726 South Western Avenue, Suite...

  10. License - Open TG-GATEs | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Open TG-GATEs License License to Use This Database Last updated : 2012/05/24 You may use this database...scribed below. The Standard License specifies the license terms regarding the use of this database and the r...equirements you must follow in using this database. The Additional License specif...icense. Standard License The Standard License for this database is the license specified in the Creative Com...mons Attribution-Share Alike 2.1 Japan . If you use data from this database, plea

  11. U.S. regulatory requirements for nuclear plant license renewal: The B and W Owners Group License Renewal Program

    International Nuclear Information System (INIS)

    Staudinger, Deborah K.

    2004-01-01

    This paper discusses the current U.S. Regulatory Requirements for License Renewal and describes the Babcock and Wilcox Owners Group (B and WOG) Generic License Renewal Program (GLRP). The B and W owners, recognizing the need to obtain the maximum life for their nuclear generating units, embarked on a program to renew the licenses of the seven reactors in accordance with the requirements of the Atomic Energy Act of 1954 and further defined by Title 10 of the Code of Federal Regulation Part 54 (10 CFR 54). These reactors, owned by five separate utilities, are Pressurized Water Reactors (PWR) ranging in net rated capacity from approximately 800 to 900 MW. The plants, predominately constructed in the 70s, have USNRC Operating Licenses that expire between 2013 to 2017. (author)

  12. Optimal Licensing Strategy: Royalty or Fixed Fee?

    OpenAIRE

    Andrea Fosfuri; Esther Roca

    2004-01-01

    Licensing a cost-reducing innovation through a royalty has been shown to be superior to licensing by means of a fixed fee for an incumbent licensor. This note shows that this result relies crucially on the assumption that the incumbent licensor can sell its cost-reducing inno-vation to all industry players. If, for any reason, only some competitors could be reached through a licensing contract, then a fixed fee might be optimally chosen.

  13. Postulated licensing schedule for an independent spent-fuel-storage installation

    International Nuclear Information System (INIS)

    Ludwick, J.D.

    1982-11-01

    A review of licensing requirements, processes, and anticipated actions for independent spent fuel storage installations (ISFSIs) was conducted in order to develop an estimated schedule and sequence of events for licensing a new ISFSI. This estimate will be useful to potential ISFSI owners in planning for the licensing of their facilities. It is concluded that, although many uncertainties exist with respect to such things as legal appeals, about 29 months are estimated to elapse between license application and license issuance for an ISFSI. This estimate is in reasonable agreement with a previous time estimate for licensing an ISFSI, and, taking into account the special circumstances involved, with the actual licensing schedule for the GE-Morris ISFSI. However, individual portions of the licensing schedule from each case studied sometimes vary significantly

  14. License - TMFunction | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMFunction License License to Use This Database Last updated : 2017/01/23 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...ion-Share Alike 4.0 International is found here . With regard to this database, you are licensed to: freely

  15. 36 CFR 264.3 - Licensing for commercial use.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Licensing for commercial use... PROPERTY MANAGEMENT Official Forest Service Insignia § 264.3 Licensing for commercial use. (a) Each commercial license granted for the use of the insignia or likeness thereof shall contain the following terms...

  16. Compliance with driver's license laws and illegal licensing among commercial bus drivers in Lagos, Nigeria: policy implications and evidence for action.

    Science.gov (United States)

    Okafor, I P; Odeyemi, K A; Dolapo, D C; Adegbola, A A

    2014-09-01

    To determine the level of compliance with driver's license laws among commercial bus drivers in Lagos, Nigeria. Two intercity motor parks were selected by simple random sampling and all consenting minibus drivers participated in the study. Key Informant Interviews (KIIs) were also conducted with selected officials in the driver training and licensing authorities. Compliance with the minimum age for driving was high (93.6%), so also was having driving test prior to driver's license procurement (83.3%). Formal driver training and VA testing were very low, (26.1% and 32.9% respectively) Overall, only 9.3% of them were found to have fulfilled all the pre-license obligations before obtaining their first driver's license. The odds of a driver with a secondary education having formal driver training is 3.33 times higher than those with no education (OR 3.33, 95% CI 1.01-11.35). Drivers who were 60 years or older were 3.62 times more likely to be compliant than those who were between 20-29 years (OR 3.62, 95% CI 0.56-29.19). For the 98.3% of them who possessed valid licenses, 52.3% of them obtained them illegally. All the key officials saw RTIs as a serious public health problem but faced several challenges in the course of their work. Overall compliance with pre-license regulations was very poor. There is need for a review and strict enforcement of driver's license laws to improve compliance. Also vital are fostering inter-sectoral collaboration and improvement in the operations of all establishments involved in driver training and license procurement in Nigeria.

  17. 75 FR 4571 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-01-28

    .... Applications: Therapies for tumors associated with NF1 (including brain and peripheral nervous system tumors...-US-01). Licensing Status: Available for licensing. Licensing Contact: Patrick P. McCue, Ph.D.; 301...

  18. List of Nuclear Materials Licensing Actions Received

    Data.gov (United States)

    Nuclear Regulatory Commission — A catalog of all Materials Licensing Actions received for review. The catalog lists the name of the entity submitting the license application, their city and state,...

  19. 36 CFR 271.4 - Commercial license.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Commercial license. 271.4... BEARâ SYMBOL § 271.4 Commercial license. (a) The Chief may authorize the commercial manufacture... a use or royalty charge which is reasonably related to the commercial enterprise has been...

  20. NEG-shift, Licensing, and Repair Strategies

    DEFF Research Database (Denmark)

    Christensen, Ken Ramshøj

    2008-01-01

    I entertain the idea that the cross-linguistic variation in the licensing of NEG-shift, the movement of negative objects to spec-NegP, can be accounted for by a few representational constraints that are not directly related to case licensing or feature checking, and which potentially conflict...

  1. TMI-related requirements for new operating licenses. Technical report

    International Nuclear Information System (INIS)

    1980-06-01

    There are four types of TMI-related requirements and actions approved by the Commission for new operating licenses: (1) those required to be completed by a license applicant prior to receiving a fuel-loading and low-power testing license, (2) those required to be completed by a license applicant prior to receiving a license to operate at appreciable power levels up to full power, (3) those the NRC will take prior to issuing a fuel-loading and low-power testing or a full-power operating license, and (4) those required to be completed by a licensee prior to a specified date. In this report, only those dated requirements that have already been issued are of interest. Other dated requirements are expected to be issued in the future as work progresses in accordance with the TMI Action Plan. This report summarizes the several parts of the list of TMI-related requirements approved by the Commission for new operating licenses

  2. Reassessing Occupational Licensing Of Tour Guides (Opinion Piece

    Directory of Open Access Journals (Sweden)

    Amir SHANI

    2017-06-01

    Full Text Available It is conventionally held that to protect tourists from incompetent and/or unscrupulous tour guides, governments should require guides to be licensed in order to legally practice their profession. Despite the implementation of such regulatory statutes in many countries, it is argued in this opinion paper that the severe drawbacks of licensing demands should be re-evaluated by both policy-makers and tourism scholars. The licensing of guides is not only an ineffective means of quality assurance, with negative consequences for many of those involved, but it also undermines the ethical foundations of a free society. Furthermore, licensing is an archaic practice for ensuring standardization among the members of a profession in a way that is no longer suitable for addressing the challenges of the tourism industry in the 21st century, in which a wide variety of specialized and innovative guided tours are offered to tourists. Although this commentary presents a firm stand against the compulsory licensing of tour guides, it should be seen as an invitation for open discussion among tourism researchers regarding the necessity of licensing tour guides in particular, and of government tourism regulation in general. Moreover, further research is needed to clarify key points on the issue of the professional licensing of tour guides.

  3. 50 CFR 80.4 - Diversion of license fees.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Diversion of license fees. 80.4 Section 80... fees. Revenues from license fees paid by hunters and fishermen shall not be diverted to purposes other than administration of the State fish and wildlife agency. (a) Revenues from license fees paid by...

  4. Perspective about the US license Renewal for NNPP's

    International Nuclear Information System (INIS)

    Lehnert, D. F.

    2004-01-01

    This article provides and overview of the US License Renewal Rule, 10 CFR 54, and its implementation in the US leading to the preparation and review of a license renewal application. The key regulatory documents and the industry's methodology and guidance for successfully implementing the Rule are discussed. While the process still undergoes change and optimization, it has become predictable and reliable, such that utilities can establish realistic schedules and budgets to complete the license renewal process. Nearly 60% of the US operating units have either received and extended operating license, have submitted their application for review, or have committed to submit an application in the next few years. The article concludes with a discussion of lessons learned from this wealth of experience and some emerging issues that may affect license renewal process. (Author)

  5. 12 CFR 14.60 - Qualification and licensing requirements for insurance sales personnel.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Qualification and licensing requirements for insurance sales personnel. 14.60 Section 14.60 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF... insurance product or annuity in any part of its office or on its behalf, unless the person is at all times...

  6. A comparison of licensed and un-licensed artisanal and small-scale gold miners (ASGM in terms of socio-demographics, work profiles, and injury rates

    Directory of Open Access Journals (Sweden)

    Benedict N. L. Calys-Tagoe

    2017-11-01

    Full Text Available Abstract Background Artisanal and small-scale gold mining (ASGM represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. Methods In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Results Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months. Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73% when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years versus 5.0 (62 injuries in 1250 person-years in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years versus an un-licensed mine (6.1 per 100 person years. Conclusions These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed

  7. Licensing of simple digital devices

    International Nuclear Information System (INIS)

    Jackson, T. W.

    2008-01-01

    The inability to guarantee error-free software gave rise to the potential for common-cause failure of digital safety systems in nuclear power plants. To address this vulnerability, the U. S. Nuclear Regulatory Commission (NRC) required a quality software development process and a defense-in-depth and diversity analysis for digital safety systems. As a result of recent interim [NRC] staff guidance in the digital instrumentation and control (I and C) area, licensing of simple digital devices decreases some regulatory burden with respect to demonstrating a quality software development process and defense-in-depth and diversity analysis. This paper defines simple digital devices and addresses the interim staff guidance that applies to such devices. The paper also highlights the technical aspects that affect the licensing of such devices and incorporates licensing experience in the U.S. to date. (authors)

  8. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  9. Scallop License Limitation Program (SLLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — A federal Scallop License Limitation Program (SLLP) license is required onboard any vessel deployed in scallop fisheries in Federal waters off Alaska (except for...

  10. Empirical Study of Car License Plates Recognition

    OpenAIRE

    Dina, Nasa Zata; Dailey, Matthew

    2015-01-01

    The number of vehicles on the road has increased drastically in recent years. The license plate is an identity card for a vehicle. It can map to the owner and further information about vehicle. License plate information is useful to help traffic management systems. For example, traffic management systems can check for vehicles moving at speeds not permitted by law and can also be installed in parking areas to se-cure the entrance or exit way for vehicles. License plate recognition algorithms ...

  11. Guide to request license for teletherapy practice

    International Nuclear Information System (INIS)

    2000-01-01

    In this work the steps to request license for teletherapy practice are described , among these steps they it continued it plows to request the qualified personnel's yams, the operation authorization, application purpose, license type

  12. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Wei-Whua Loa; Suan Chen; Wei-Chu Yu

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal of High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated, because too many factors must be taken into consideration. For the time being, licensing review is as much an art as it is a science. The authority usually faces three major problems; (1) the availability of domain expert, (2) maintaining of high quality and consistent reviews, and (3) the documentation of the review process. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper we will discuss the development of the radioactive waste management licensing review assistant

  13. License - DGBY | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available rch Institute, National Agriculture and Food Research Organization (NARO) 2-1-12 Kannondai, Tsukuba, Ibaraki...t a license for use of this database or any part thereof not licensed under the license. National Food Resea

  14. Licensed fuel facility status report: Inventory difference data, July 1, 1992--June 30, 1993

    International Nuclear Information System (INIS)

    Joy, D.R.

    1994-02-01

    The Nuclear Regulatory Commission is committed to an annual publication of licensed fuel facilities' inventory difference (ID) results, after Agency review of the information and completion of any related investigations. Information in this report includes ID results for active fuel fabrication and/or recovery facilities. Acronyms and/or abbreviations used in this report are identified on page vii. The various terms and acronyms used in this publication are defined on pages 1 through 4. It should be noted that UNC-Naval Products (Docket No. 70-371 and License No. SNM-368) in Montville, Connecticut, has been deleted from this report because of its inactive status

  15. Could a scheme for licensing smokers work in Australia?

    Science.gov (United States)

    Magnusson, Roger S; Currow, David C

    2013-08-05

    In this article, we evaluate the possible advantages and disadvantages of a licensing scheme that would require adult smokers to verify their right to purchase tobacco products at point of sale using a smart-card licence. A survey of Australian secondary school students conducted in 2011 found that half of 17-2013-old smokers and one-fifth of 12-2013-old smokers believed it was "easy" or "very easy" to purchase cigarettes themselves. Reducing tobacco use by adolescents now is central to the future course of the current epidemic of tobacco-caused disease, since most current adult smokers began to smoke as adolescents--at a time when they were unable to purchase tobacco lawfully. The requirement for cigarette retailers to reconcile all stock purchased from wholesalers against a digital record of retail sales to licensed smokers would create a robust incentive for retailers to comply with laws that prohibit tobacco sales to children. Foreseeable objections to introducing a smokers licence need to be taken into account, but once we move beyond the "shock of the new", it is difficult to identify anything about a smokers licence that is particularly offensive or demeaning. A smoker licensing scheme deserves serious consideration for its potential to dramatically curtail retailers' violation of the law against selling tobacco to minors, to impose stricter accountability for sale of a uniquely harmful drug and to allow intelligent use of information about smokers' purchases to help smokers quit.

  16. License - Dicty_cDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Dicty_cDB License to Use This Database Last updated : 2010/02/15 You may use this database i...w. The Standard License specifies the license terms regarding the use of this database and the requirements ...you must follow in using this database. The Additional License specifies those it...dard License The Standard License for this database is the license specified in the Creative Commons Attribu...tion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database

  17. Progress in licensing ITER in Cadarache

    International Nuclear Information System (INIS)

    Rodriguez-Rodrigo, Lina; Girard, Jean-Philippe; Uzan-Elbez, Joelle; Marbach, Gabriel; Garin, Pascal; Rosanvallon, Sandrine

    2005-01-01

    The licensing procedure for ITER in Europe in the framework of the French regulations is a non-prescriptive approach based on a continuous dialogue between the nuclear installation owner (or its representative) and the safety authority. In this paper, the licensing procedure and main safety issues, which are being studied in this process, are presented

  18. 78 FR 17942 - Request To Amend a License To Export High-Enriched Uranium

    Science.gov (United States)

    2013-03-25

    ... NUCLEAR REGULATORY COMMISSION Request To Amend a License To Export High-Enriched Uranium Pursuant... Administration. Enriched Uranium contained in 99.7 Reactor in the be processed for March 6, 2013 (93.35%)) kilograms Czech Republic to medical isotope March 11, 2013 uranium) the list of production at the XSNM3622...

  19. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  20. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    1997-01-01

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  1. Licensing of New Nuclear Power Plants in Canada

    International Nuclear Information System (INIS)

    Schwarz, Garry; Miller, Doug

    2011-01-01

    The regulatory process for new power plant licensing in Canada, from receipt of the initial application to commercial operation, can be divided into three phases: - Environmental Assessment (EA) and License to Prepare Site; - License to Construct; and - License to Operate. The Nuclear Safety and Control Act (NSCA) does not have provisions for combined licenses for site preparation, construction, or operation. Separate licenses must, therefore, be granted for each phase, and would be issued in sequence. However, applications to prepare a site, to construct and to operate a new nuclear power plant could be assessed in parallel. The total duration from the application for the License to Prepare Site to the issuance of the License to Operate (which is a prerequisite for first fuel load) has been established as 9 years subject to certain factors. To help facilitate this timeline, the CNSC has undertaken an aggressive program of documenting regulatory practices, requirements and guidance to assist applicants in submitting complete applications. Working level procedures to assist CNSC staff in their review of submissions are also under development. Extensive program and project management has been introduced to ensure that timelines will be achieved. In parallel with the above activities, regulatory oversight measures to be employed during site preparation activities and plant construction and commissioning are also being developed. On the international front, the CNSC is participating in the MDEP program to leverage the resources and knowledge of other national regulatory authorities in reviews the CNSC is undertaking. The CNSC also participates in IAEA and other international activities to utilize/adapt international practices as appropriate in Canada. (authors)

  2. The nuclear licensing procedure

    International Nuclear Information System (INIS)

    Wagner, H.

    1976-01-01

    To begin with, the present nuclear licensing procedure is illustrated by a diagram. The relationship between the state and the Laender, the various experts (GRS - IRS + LRA -, TUEV, DWD, university institutes, firms of consulting engineers, etc), participation of the public, e.g. publication of the relevant documents, questions, objections (made by individuals or by groups such as citizens' initiatives), public discussion, official notice, appeals against the decision, the right of immediate execution of the decision are shortly dealt with. Finally, ways to improve the licensing procedure are discussed, from the evaluation of the documents to be submitted, published, and examined by the authorities (and their experts) up to an improvement of the administrative procedure. An improved licensing procedure should satisfy the well-founded claims of the public for more transparency as well as the equally justifiable claims of industry and utilities in order to ensure that the citizens' legal right to have safe and adequate electric power is guaranteed. The updated energy programme established by the Federal Government is mentioned along with the effectiveness of dealing with nuclear problems on the various levels of a Land government. (orig.) [de

  3. Development of radioactive waste management licensing review assistant

    International Nuclear Information System (INIS)

    Loa, W.W.; Chen, S.; Yu, W.C.; Peng, C.M.; Huang, C.L.; Lin, C.

    1992-01-01

    Regulations on radioactive waste disposal are now in urgent need due to our increasing consumption of electric power from nuclear origin. It is set forth that actually applying the regulations to evaluate the license application of new repositories for interim storage and final disposal fo High-Level Waste and Low-Level Waste before the year of 2000. In the mean time, it is expected to establish the basis for the decision on issuing the license. The license review procedure can be very complicated because too many factors must be taken into consideration. However, to maintain a more efficient, accurate, and systematic review procedure, and at the same time to reduce costs, the Artificial Intelligence (AI) techniques may be used. An expert system is designed as a radioactive waste management licensing review aid for the staff those are in charge of the license application. Tasks such as completeness checking, functional areas of review distribution, participation confirmation, knowledge acquisition, review comment collection, weighting calculation, and degree of satisfaction are considered. In this paper the authors will discuss the development of the radioactive waste management licensing review assistant

  4. 48 CFR 1852.227-86 - Commercial computer software-Licensing.

    Science.gov (United States)

    2010-10-01

    .../contractor proposes its standard commercial software license, those applicable portions thereof consistent... its standard commercial software license until after this purchase order/contract has been issued, or at or after the time the computer software is delivered, such license shall nevertheless be deemed...

  5. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  6. Atomic Safety and Licensing Board Panel annual report

    International Nuclear Information System (INIS)

    1991-09-01

    In Fiscal Year 1990, The Atomic Safety and Licensing Board Panel (Panel) handled 40 proceedings involving the construction, operation, and maintenance of commercial nuclear power reactors or other activities requiring a license from the Nuclear Regulatory Commission. This report summarizes, highlights, and analyzes how the judges and licensing boards of the Panel addressed the wide-ranging issues raised in these proceedings during the year

  7. The road to MYRRHA. The pre-licensing phase and FEED

    International Nuclear Information System (INIS)

    2014-01-01

    The article discusses the study phase of the future research reactor MYRRHA. This study phase covers three major areas: Research and Development, licensing and engineering. In 2013, substantial progress was made in the licensing and engineering processes: licensing is currently in the pre-licensing phase, while, for engineering, the Front-end Engineering and Design (FEED) contract was signed for the construction of the non-nuclear parts of MYRRHA. The article highlights work associated with the the pre-licensing phase and the FEED.

  8. Systems engineering and the licensing of Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kulesa, T., E-mail: tkulesa@us.ibm.com [IBM, Philidelphia, Pennsylvania (United States); Soderholm, K., E-mail: Kristiina.Soderholm@fortum.com [Fortum Power (Finland); Fechtelkotter, P., E-mail: pfech@us.ibm.com [IBM, Boston, Massacheusets (United States)

    2014-07-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  9. Systems engineering and the licensing of Small Modular Reactors

    International Nuclear Information System (INIS)

    Kulesa, T.; Soderholm, K.; Fechtelkotter, P.

    2014-01-01

    Both global warming and the need for dependable sources of energy continue to make nuclear power generation an appealing option. But a history of cost overruns, project delays, and environmental disaster has pushed the industry to innovate and design a more flexible, scalable, and safe source of nuclear energy - the small modular reactor. Innovation in generation technology creates disruption in already complex licensing and regulatory processes. This paper discusses how the application of systems engineering and requirements management can help combat confusion, rework, and efficiency problems across the engineering and compliance life cycle. The paper is based on the PhD Dissertation 'Licensing Model Development for Small Modular Reactors (SMRs) - Focusing on Finnish Regulatory Framework', approved in 2013. The result of the study gives recommendations and tools to develop and optimize the licensing process for SMRs. The most important SMR-specific feature, in terms of licensing, is the modularity of the design. Here the modularity indicates multi-module SMR designs, which creates new challenges in the licensing process. Another feature impacting licensing feasibility is the plan to build many standardized power plants in series and use factory-fabricated modules to optimize the construction costs. SMR licensing challenges are under discussion in many international forums, such as World Nuclear Association Cooperation in Reactor Design Evaluation and Licensing Small Modular Reactor group (WNA CORDEL SMR) group and IAEA INPRO regulators' forum. This paper also presents an application of the new licensing process using Systems Engineering, Requirements Management, and Project Management practices and tools. (author)

  10. Status of safety issues at licensed power plants

    International Nuclear Information System (INIS)

    1991-05-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, a program has been established whereby an annual NUREG report will be published on the status of licensee implementation and NRC verification of safety issues in major NRC requirement areas. This report, the second volume of a three-volume series, addresses the status of unresolved safety issues (USIs) at licensed plants. The data contained in these NUREG reports are a product of the NRC's Safety Issues Management System (SIMS) database, which is maintained by the Project Management Staff in the Office of Nuclear Reactor Regulation and by NRC regional personnel. The purpose of this report is to provide a comprehensive description of the status of implementation and verification of the 27 safety issues designated as USIs and to make this information available to other interested parties, including the public. A corollary purpose of this NUREG report is to serve as a follow-on to NUREG-0933, ''A Prioritization of Generic Safety Issues,'' which tracks safety issues up until requirements are approved for imposition at licensed plants. 3 figs., 4 tabs

  11. A new licensing strategy for Canadian mobile earth stations

    Science.gov (United States)

    Amero, Ronald G.

    1990-01-01

    Initiatives presently under consideration by the Department of Communications which will greatly simplify the licensing process for mobile earth stations are addressed. The current licensing approach is reviewed and the limitations of that system identified. A new approach is needed to respond to the needs of mobile satellite users in the 1990's and beyond, one which will have a minimal impact on the user while still respecting the legislative responsibilities of the department under the new Radiocommunication Act and the General Radio Regulations. The objective of this new strategy is to lead to a transparent licensing scheme for the end user, which in turn could lead to license exemption of blanket licenses as soon as possible.

  12. 75 FR 81628 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2010-12-28

    ... National Institute of Diabetes and Digestive and Kidney Disease (NIDDK), part of the National Institute of... 2010 (HHS Reference No. E-116-2010/0-US-01). Licensing Status: Available for licensing. Licensing...; [email protected] . Collaborative Research Opportunity: The National Institute of Diabetes and...

  13. 48 CFR 52.227-19 - Commercial Computer Software License.

    Science.gov (United States)

    2010-10-01

    ... Software License. 52.227-19 Section 52.227-19 Federal Acquisition Regulations System FEDERAL ACQUISITION... Clauses 52.227-19 Commercial Computer Software License. As prescribed in 27.409(g), insert the following clause: Commercial Computer Software License (DEC 2007) (a) Notwithstanding any contrary provisions...

  14. License - Yeast Interacting Proteins Database | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Yeast Interacting Proteins Database License to Use This Database Last updated : 2010/02/15 You may use this database...nal License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additional ...the Standard License. Standard License The Standard License for this database is the license specified in th...e Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  15. Recent developments in Canadian nuclear power plant licensing practices

    International Nuclear Information System (INIS)

    Marchildon, P.

    1985-06-01

    This paper examines the dominant factors which have influenced the safety evaluation and licensing process of current 600 MW reactors. It describes possible modifications to the process which are being considered for the licensing of a second 600 MW reactor at Point Lepreau. The key element is a firm licensing agreement covering the entire licensing cycle, to be established between the proponent and the AECB before a construction licence is issued. Progress accomplished to date in reaching such an agreement is described

  16. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  17. Licensing process for future applications of advanced-design nuclear reactors

    International Nuclear Information System (INIS)

    Miller, C.L.

    1990-01-01

    The existing 10CFR50 two-step licensing process in the Code of Federal Regulations can continue to be a viable licensing vehicle for future applications, at least for the near future. The US Nuclear Regulatory Commission (NRC) Commissioners and staff, the public, and the utilities (along with supporting architect/engineers and nuclear steam supply system vendors) have a vast body of experience and knowledge of the existing part 50 licensing process. All these participants are familiar with their respective roles in this process, and history shows this process to be a workable licensing vehicle. Nevertheless, the use of 10CFR52 should be encouraged for future applications. This proposed new rule is intended to achieve the early resolution of licensing issues, to reduce the complexity and uncertainty of the licensing process, and enhance the safety and reliability of nuclear power plants. Part 52's overall purpose is to improve reactor safety and streamline the licensing process by encouraging the use of standard reactor designs and by allowing the early resolution of site environmental and reactor safety issues. The public should be afforded an earlier entry into the licensing process as a result of design certification rulemaking process and combined construction permit/operating license hearings

  18. MATLAB Software Versions and Licenses for the Peregrine System |

    Science.gov (United States)

    High-Performance Computing | NREL MATLAB Software Versions and Licenses for the Peregrine System MATLAB Software Versions and Licenses for the Peregrine System Learn about the MATLAB software Peregrine is R2017b. Licenses MATLAB is proprietary software. As such, users have access to a limited number

  19. LicenseScript: A Logical Language for Digital Rights Management

    NARCIS (Netherlands)

    Chong, C.N.; Corin, R.J.; Doumen, J.M.; Etalle, Sandro; Hartel, Pieter H.; Law, Y.W.; Tokmakoff, Andrew

    We propose LicenseScript, a language for digital rights management (DRM) based on multiset rewriting and logic programming. LicenseScript enjoys a precise syntax and semantics, and it is rich enough to embed other rights expression languages (REL). We show that LicenseScript is expressive and

  20. Greenland unveils terms for offshore licenses

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Greenland has spelled out terms for its first round of offshore licensing. The action off western Greenland could lead to the first oil and gas exploration there since an unsuccessful campaign in the 1970s. The Mineral Resources Administration (MRA) for Greenland pegged exploration license terms on 133 blocks, all south of the 66th parallel, at 10 years with options for 2 year extensions to a maximum of 6 more years. The license can cover as many as six blocks. In the first 3 year period companies will have only a seismic obligation of 1,588 km per six blocks. For the second 3 year period there will be a one well obligation and one well in each subsequent 2 year periods

  1. License - CREATE portal | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us CREATE portal License License to Use This Database Last updated : 2016/03/16 You may use this database... the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribu...tion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  2. Changing mobility patterns and road mortality among pre-license teens in a late licensing country: an epidemiological study.

    Science.gov (United States)

    Twisk, Divera; Bos, Niels; Shope, Jean T; Kok, Gerjo

    2013-04-11

    Whereas the safety of teens in early licensing countries has been extensively studied, little is known about the safety of pre-license teens in late licensing countries, where these teens also may be at risk. This risk exists because of the combination of a) increasing use of travel modes with a high injury risk, such as bicycles and mopeds, b) inexperience, and c) teens' developmental stage, known to be associated with risk taking and novelty seeking, especially among males. To explore the magnitude and nature of pre-license road risk, this study analysed epidemiological data from the Netherlands, and hypothesized that in this late licensing country, 'independent travel' and the use of riskier modes of transport increase among pre-license teens 10 to 17 years of age, resulting in higher fatality rates, with 'experience' and 'gender' as risk modifying factors. National travel and fatality data of pre-license adolescents in the Netherlands were analysed by traffic role (cyclist, pedestrian, car passenger and moped rider), and compared to a younger age group (0-9 years) and an older age group (18+ years). The study of travel data showed that teens migrate from being car occupants to being users of riskier modes of transport, specifically bicycles and mopeds. This migration resulted in a strong rise in road fatalities, illustrating the importance of mobility patterns for understanding changes in road fatalities in this age group. The data further suggested a protective role of early cycle experience for young adolescent cyclists, particularly for young males. But further study into the underlying mechanism is needed to confirm this relationship. Moped risk was extremely high, especially among young males, and even higher than that of young male car drivers. The study confirmed the importance of changes in mobility patterns for understanding the rising road mortality when youngsters enter into their teens. The focus on fatalities has led to an underestimation of the

  3. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  4. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  5. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  6. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  7. A Real-time License Plate Detection System for Parking Access

    Directory of Open Access Journals (Sweden)

    Roenadi Koesdijarto

    2010-08-01

    Full Text Available The automatic and real-time license plate detection system can be used as an access control entry of vehicles into the parking area. The problem is how to recognize the vehicles that will go into the parking lot and how to recognize various types of license plates in various light conditions quickly and accurately. In this research, the prototype was developed with a detection system to recognize the vehicles that will enter the parking area, and a license plate recognition system. In the license plate recognition system, the Fourier transform and Hidden Markov model method have proposed to detect location of license plate and as characters segmentation to recognize Indonesia license plates. The research results have shown that the developed prototype system has successfully recognized all Indonesia license plates in several of light condition and camera position. The percentage of plate recognition in the real-time experiment is 84.38%, and the average execution time for all recognition process is 5.834 second.

  8. Integration of MGDS design into the licensing process

    International Nuclear Information System (INIS)

    1997-12-01

    This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design for a potential repository is integrated into the licensing process. The integration process employs a two-told approach: (1) ensure that the MGDS design complies with applicable Nuclear Regulatory Commission (NRC) licensing requirements, and (2) ensure that the MGDS design is appropriately reflected in a license application that is acceptable to the NRC for performing acceptance and compliance reviews

  9. Current safety issues of CANDU licensing

    International Nuclear Information System (INIS)

    Lee, Y.; Natalizio, A.

    1994-01-01

    As requested by Korea Institute of Nuclear Safety(KINS), the status of five generic licensing issues has been examined and their potential impact on a new plant that would be constructed in Canada has been evaluated. The results and conclusions of this evaluation are summarized as follows: steam explosion in calandria, hydrogen explosion in containment, use of PSA in reactor licensing, human factors, safety critical software

  10. License - Metabolonote | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Metabolonote License License to Use This Database Last updated : 2016/06/22 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...e Creative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database

  11. 78 FR 20106 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-04-03

    ... M. Tsai, President (QI). Application Type: New NVO License. American International Shipping Company... Type: New NVO License. Nippon Concept America, LLC (OFF), 2203 Timberloch Place, Suite 218D, The...

  12. 15 CFR 732.4 - Steps regarding License Exceptions.

    Science.gov (United States)

    2010-01-01

    ... General Prohibition Six (Embargo), consult part 746 of the EAR for applicable License Exceptions. (b... export or reexport is subject to General Prohibition Six (Embargo) for embargoed destinations, License...

  13. 48 CFR 1852.225-70 - Export Licenses.

    Science.gov (United States)

    2010-10-01

    ... writing, that the Contracting Officer authorizes it to export ITAR-controlled technical data (including... licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance. (b) The Contractor shall be responsible for obtaining export licenses, if...

  14. Licensing of HTGRs in the United States

    International Nuclear Information System (INIS)

    Fisher, C.R.; Orvis, D.D.

    1981-01-01

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented. (author)

  15. Generational differences among newly licensed registered nurses.

    Science.gov (United States)

    Keepnews, David M; Brewer, Carol S; Kovner, Christine T; Shin, Juh Hyun

    2010-01-01

    Responses of 2369 newly licensed registered nurses from 3 generational cohorts-Baby Boomers, Generation X, and Generation Y-were studied to identify differences in their characteristics, work-related experiences, and attitudes. These responses revealed significant differences among generations in: job satisfaction, organizational commitment, work motivation, work-to-family conflict, family-to-work conflict, distributive justice, promotional opportunities, supervisory support, mentor support, procedural justice, and perceptions of local job opportunities. Health organizations and their leaders need to anticipate intergenerational differences among newly licensed nurses and should provide for supportive working environments that recognize those differences. Orientation and residency programs for newly licensed nurses should be tailored to the varying needs of different generations. Future research should focus on evaluating the effectiveness of orientation and residency programs with regard to different generations so that these programs can be tailored to meet the varying needs of newly licensed nurses at the start of their careers. Copyright 2010 Mosby, Inc. All rights reserved.

  16. Licensing of HTGRs in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, C. R.; Orvis, D. D. [General Atomic Co., San Diego, CA (USA)

    1981-01-15

    The licensing history of the high-temperature gas-cooled reactor (HTGR) in the United States is given historical perspective. The experience began with the licensing of the Peach Bottom Atomic Power Station and extends to the continuing experience at the Fort St. Vrain Nuclear Generating Station. Additional experience was obtained from the licensing reviews in the mid-1970s of the large HTGR plants that were to be built by Philadelphia Electric Company and Delmarva Power and Light. Also, information was provided by the licensing review of the General Atomic standard plant by the U.S. Nuclear Regulatory Commission (NRC) at about the same time. These experiences are summarized in terms of the principal design criteria that were required by the regulatory authority for each project. These criteria include specification of the design basis accidents that were postulated for the plant safety analysis. Several technical issues raised by the NRC during their review of the large HTGR are presented.

  17. License - Society Catalog | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Society Catalog License License to Use This Database Last updated : 2012/01/17 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as...is found here . With regard to this database, you are licensed to: freely access part or whole of this database

  18. The Licensing of New Nuclear Power Plants in Europe

    International Nuclear Information System (INIS)

    Raetzke, C.

    2008-01-01

    After an introduction dealing with the nuclear Renaissance in Europe and the specific situation of Germany and of Italy, the article focuses on the question of licensing processes for new reactors. New nuclear power plant projects involve a substantial investment and electric utilities will only take this decision if the licensing and regulatory risk can be adequately managed. Licensing processes should be predictable and efficient in order to give sufficient assurance to applicants. The article discusses best practice in licensing by giving some examples of suitable licensing processes of other countries. It also highlights international initiatives aimed at harmonizing safety requirements for new reactors and a multinational cooperation in reactor design review. These issues should be carefully considered by any country wanting to get new nuclear started. [it

  19. New Jersey's license plate decal requirement for graduated driver licenses: attitudes of parents and teenagers, observed decal use, and citations for teenage driving violations.

    Science.gov (United States)

    McCartt, Anne T; Oesch, Nathan J; Williams, Allan F; Powell, Tara Casanova

    2013-01-01

    On May 1, 2010, New Jersey implemented a law requiring teenagers with learner's permits or probationary licenses to display reflective decals on the front and rear license plates when they drive. The current study examined attitudes of parents and teenagers toward this requirement, use of decals, and reported violations and police enforcement of the graduated driver license law. Statewide telephone surveys of representative samples of parents and teenagers were conducted in February to April 2010 and March to June 2011. Use of decals among probationary license holders was observed at 4 high schools in fall 2010 and in spring 2011 and hand-out surveys were distributed. Data on citations issued for violations of the graduated driver license law were obtained. When interviewed in spring 2011, a large majority of parents of probationary license holders, parents of learner's permit holders, and teenagers with probationary licenses disapproved of decals for probationary licenses. About two thirds of both sets of parents and about half of teenagers disapproved of decals for learner's permits. Support for decals for both license types declined significantly from 2010 to 2011. For parents and teenagers alike, opposition was mainly attributed to concern about identifying and/or targeting teenage drivers by other drivers, predators, or police. In 2011, 77 percent of parents of probationary license holders said that their teenagers had decals for the vehicles driven most often; 46 percent said their teenagers always used decals. Fifty-six percent of parents of learner's permit holders said that their teenagers had decals for the vehicles driven most often; 37 percent said that their teenagers always used decals. Teenagers' reported violations of license restrictions either increased or were similar in 2011 compared to 2010. Observed rates of decal use by probationary license holders at high schools in spring 2011 ranged from 24 to 64 percent. The number of statewide citations

  20. Licensing biotech intellectual property in university-industry partnerships.

    Science.gov (United States)

    Drozdoff, Vladimir; Fairbairn, Daryl

    2015-01-20

    Appropriate negotiation and drafting of license agreements are critical to successfully establishing and managing the expansive and complex relationships that are becoming more common between industry and universities. More often than not, the resulting licensing agreements become quite lengthy and complex, and the key principles become difficult to discern among all the details. This summary provides a short, nonexhaustive introduction to some of the essential components of these licenses with the intent of providing the non-licensing professional a better appreciation of some of the key commercial and legal terms from both an academic and company perspective, keeping in mind some of the considerations that particularly apply to biotechnology deals. Copyright © 2015 Cold Spring Harbor Laboratory Press; all rights reserved.

  1. The licensing of nuclear power plants in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    In Brazil the governmental organization responsible for the licensing of NPPs is the Comissao Nacional de Energia Nuclear (CNEN), the Brazilian Regulatory Body. A description of CNEN's organization, responsabilities and working methods, as well as the present situation of the Brazilian NPPs undergoing licensing, has recently been presented. In this paper the experience gained by CNEN in the course of licensing Brazilian NPPs Units I and II is discussed. CNEN's present day technical competence and its future trends are analysed with regard to in-house capacity, foreign consultants and research contracts with Brazilian Universities. Finally, the immediate need for a Safety research programm in support of licensing is discussed. Manpower needs and major areas for such a programm are also indicated. (orig./RW)

  2. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  3. 77 FR 64992 - Ocean Transportation Intermediary License Reissuances

    Science.gov (United States)

    2012-10-24

    ..., Kenner, LA 70062. Date Reissued: August 15, 2012. License No.: 020088N. Name: Hal-Mari International... 91754. Date Reissued: September 5, 2012. License No.: 019372F. Name: Hal-Mari International Logistics...

  4. 77 FR 40882 - Ocean Transportation Intermediary License; Revocations

    Science.gov (United States)

    2012-07-11

    ...: Voluntarily surrendered license. License Number: 021243NF. Name: Cargo Logistics & Trade Solutions, Limited Liability Company. Address: 13367 NW 47th Avenue, Opa Locka, FL 33054. Date Revoked: May 26, 2012. Reason...

  5. 13 CFR 107.1900 - Surrender of license.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Surrender of license. 107.1900 Section 107.1900 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS INVESTMENT COMPANIES Ending Operations as a Licensee § 107.1900 Surrender of license. You may not surrender your...

  6. 22 CFR 120.21 - Manufacturing license agreement.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Manufacturing license agreement. 120.21 Section... DEFINITIONS § 120.21 Manufacturing license agreement. An agreement (e.g., contract) whereby a U.S. person grants a foreign person an authorization to manufacture defense articles abroad and which involves or...

  7. Licensing activities for advanced reactors in NNC

    International Nuclear Information System (INIS)

    Chevalier, A.B.H.; Mustoe, J.; Walters, J.; Ingham, E.L.

    2001-01-01

    NNC has been involved in safety and licensing activities for advanced reactors for many years. Most recently NNC has been involved with national regulators or their representatives for the HTR (High Temperature Reactor) reactor and the possible siting of ITER (International Thermonuclear Experimental Reactor) within Europe. Commonalties between the two activities can be seen, even though one is a fission process and the other based on a completely new technology. Both have the potential to generate power at a very low overall exposure to the public and station staff, but both also need to demonstrate to the regulator the safety of a design which differs from the standard LWR practice. In both concepts passive design features provide a major part of the safety argument, but the detailed assessment and justification of these features in licensing terms still needs to be made. A number of critical safety issues can be identified, which generally apply to any advanced system. These are: Safety categorization, codes and standards; confinement or containment; ALARA; safety code modelling and data; Occupational Exposure; occupational exposures; decommissioning and waste; no evacuation, or no emergency plans. The UK is notable for a flexible licensing regime, which allows a safety case to be built up from first principles, where this is applicable. In addition, experience of licensing gas cooled, water cooled and liquid metal plant, as well as extensive experience outside the UK provides NNC with a unique insight into the different licensing methodologies which can be applied in the licensing process. This paper discusses some possible approaches which could be applied in order to satisfy regulatory demands when addressing the critical issues listed above. (author)

  8. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  9. Experience acquired by Furnas for licensing nuclear power plants

    International Nuclear Information System (INIS)

    Silva, A.J.C. da; Xavier, E.E.

    1986-01-01

    The system for licensing of Almirante Alvaro Alberto Nuclear Power Plant-Unit 1 is presented. The process phases for reactor construction and operation are described: preliminary site approval; bases for safety review; partial construction permits; final construction permits; emission of final report of safety analysis; initial operation license and permanent operation license. (M.C.K.) [pt

  10. Licensing systems and inspection of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    The first study analysing the regulations governing the licensing and inspection of nuclear installations in OECD countries was published by OECD/NEA in 1980, and revised in 1986. Since then there have been amendments to national regulations on the subject, which have warranted updating of this publication. This new study provides a description of the licensing regulations and practices applied in the twenty OECD countries with provisions in that field. The national systems have been described according to a standard format to make comparisons and research easier. In most cases, the descriptions are supplemented by flow charts illustrating the procedures and specifying the different authorities involved in the licensing procedures [fr

  11. The Brazilian market of herbal medicinal products and the impacts of the new legislation on traditional medicines.

    Science.gov (United States)

    Carvalho, Ana Cecília Bezerra; Lana, Túlio Nader; Perfeito, João Paulo Silvério; Silveira, Dâmaris

    2018-02-15

    the herbal medicinal products (HMP) market is expanding in the world, an expansion that has not occurred in Brazil when considering the number of licensed products. Despite being a megadiverse country, the number of HMP licensed in Brazil is small, and the number of HMP obtained from native species is even smaller. A new legislation for herbal products licensing, which divides the products into two categories, Herbal Medicine (HM) and Traditional Herbal Product (THP) was launched in Brazil focusing on traditional use, as well as a law regulating the use of biodiversity and traditional knowledge. to evaluate the situation of HMP licensed in Brazil and to make a comparison with the data obtained in 2008 and 2011, discussing the evolution of the licensed products and the possible impacts of the new legislation. a survey was carried out in the Brazilian Health Regulatory Agency (Anvisa) database to verify the HMP licensed in Brazil in September 2016. The data obtained were compared with two surveys previously published. There are 332 single, and 27 combined HM, totaling 359 HM licensed in Brazil. There is no THP notified in Anvisa's system yet. There are 214 HM classified as nonprescription (OTC), while 145 are sold under prescription, one of them with prescription retention. There are 101 plant species licensed as active in HM in Brazil, 39 of which are native, adapted or cultivated. The most licensed plant species is Mikania glomerata Spreng., with 25 HM licensed. The article includes tables with plant species that have derivatives licensed as simple and combined HM, their therapeutic classification, the native plant species indication and the distribution of the companies by Brazilian regions. There are few licensed HM in Brazil, and this number has been decreasing in recent years. It is expected that the data obtained, together with the changes promoted in sanitary and environmental rules, will help to develop and regulate HMP chain in Brazil. Copyright © 2017

  12. LicenseScript: A Novel Digital Rights Language

    NARCIS (Netherlands)

    Chong, C.N.; Corin, R.J.; Etalle, Sandro; Hartel, Pieter H.; Law, Y.W.; Grimm, R.; Nitzel, J.

    We propose LicenseScript as a new multi-set rewriting/logic based language for expressing dynamic conditions of use of digital assets such as music, video or private data. LicenseScript differs from the other DRM languages in that it caters for the intentional but legal manipulation of data. We

  13. A Meta-Analytic Review of Moral Licensing

    NARCIS (Netherlands)

    Blanken, Irene; van de Ven, Niels; Zeelenberg, Marcel

    2015-01-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397

  14. A meta-analytic review of moral licensing

    NARCIS (Netherlands)

    Blanken, I.; van de Ven, N.; Zeelenberg, M.

    2015-01-01

    Moral licensing refers to the effect that when people initially behave in a moral way, they are later more likely to display behaviors that are immoral, unethical, or otherwise problematic. We provide a state-of-the-art overview of moral licensing by conducting a meta-analysis of 91 studies (7,397

  15. 45 CFR 1321.75 - Licenses and safety.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Licenses and safety. 1321.75 Section 1321.75... AND COMMUNITY PROGRAMS ON AGING Service Requirements § 1321.75 Licenses and safety. The State shall... that the facility complies with all applicable State and local health, fire, safety, building, zoning...

  16. Government use licenses in Thailand: The power of evidence, civil movement and political leadership

    Directory of Open Access Journals (Sweden)

    Oh Cecilia

    2011-09-01

    Full Text Available Abstract This paper attempts to describe and analyse the policy processes that led to the granting and implementation of the government use licenses to enable the import and production of generic versions of medicines patented in Thailand. The decision to grant the series of government use licenses was taken despite much domestic and international controversy. The paper demonstrates that the policy processes leading to the granting of government use licenses are a successful application of the concept of "the triangle that moves the mountain". This is a well-known conceptualisation of a philosophical and strategic approach to public policy advocacy in Thailand, which propounds that the effective bridging of three powers; a. Knowledge and evidence generated by research and analysis, b. Civil society movements and public support, and c. Leadership of policy makers and politicians; in a synergistic "triangle" can move "mountains", meaning the resolution of seemingly insurmountable problems. The paper provides insights into the policy context for the decision and analyses the roles of key actors, their motivations and the policy processes in the country.

  17. 47 CFR 80.53 - Application for a portable ship station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable ship station license... SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Applications and Licenses § 80.53 Application for a portable ship station license. The Commission may grant a license permitting operation of a...

  18. Licensing Status of New and Expanding In-Situ Recovery Uranium Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Catchpole, G.; Thomas, M., E-mail: gccatchpole@uranerz.com [Uranerz Energy Corporation (URZ), Casper, WY (United States)

    2014-05-15

    The authors investigated the licensing status of new in-situ recovery (“ISR”) uranium projects, as well as the expansion of existing projects, within the United States (“US”). Specific emphasis and analysis is placed on those projects within the states of Texas and Wyoming. Of note, information used to prepare this paper was obtained from public sources that included company web sites, the US Securities and Exchange Commission, the US Nuclear Regulatory Commission (“NRC”), the US Energy Information Agency (“EIA”), and the relevant state regulatory agencies. The renewed interest in the production of natural uranium has been motivated, in part, by the increased sale price of yellowcake beginning around 2003 resulting in numerous new and existing natural resources companies acquiring mineral rights in the United States. Because of the economic favorability in terms of both operating and capital costs of ISR mines versus conventional mines in the US (with its relatively low grade of uranium ore), the model for most companies was to acquire mineral properties that had the potential for being mined using the ISR method. There were, however, exceptions to this model. The Uravan mineral district in southwest Colorado and southeast Utah, where relatively high-grade, shallow uranium deposits have the potential to be mined using underground methods, is one such exception. However, the focus of this paper will be on ISR projects. In Wyoming, which has been the top producer of natural uranium among the 50 states for the past seven years, there is one producing ISR mine (Bill Smith — Highland), one ISR mine on standby (Christensen Ranch), and two ISR uranium projects licensed but not yet built (Gas Hills and North Butte). Cameco Resources is planning to develop two ISR projects in Wyoming that have been licensed but not yet constructed. Additionally, three new uranium companies (Ur-Energy, Uranerz and Uranium One) have filed applications with the federal and

  19. PROCESS FOR LICENSE APPLICATION DEVELOPMENT FOR THE GEOLOGIC REPOSITORY

    International Nuclear Information System (INIS)

    DOUGLAS M. FRANKS AND NORMAN C. HENDERSON

    1997-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the U.S. Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, (section)60.21ff and (section)60.31ff. This paper discusses the process the Yucca Mountain Site Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the ''Technical Guidance Document for Preparation of the License Application'' (TGD), currently in development

  20. Process for license application development for the geologic repository

    International Nuclear Information System (INIS)

    Franks, D.M.; Henderson, N.C.

    1998-01-01

    The Department of Energy (DOE), specifically the Office of Civilian Radioactive Waste Management (OCRWM) has been charged by the US Congress, through the Nuclear Waste Policy Act (NWPA), with the responsibility for obtaining a license to develop a geologic repository. The NRC is the licensing authority for geologic disposal, and its regulations pertinent to construction authorization and license application are specified in 10 CFR Part 60, Disposal of High-Level Radioactive Wastes in Geologic Repositories, section 60.21ff and section 60.31ff. This paper discusses the process the Yucca Mountain Site Characterization Project (YMP) will use to identify and apply regulatory and industry guidance to development of the license application (LA) for a geologic repository at Yucca Mountain, Nevada. This guidance will be implemented by the Technical Guidance Document for Preparation of the License Application (TGD), currently in development

  1. Licensing experience of the HTR-10 test reactor

    International Nuclear Information System (INIS)

    Sun, Y.; Xu, Y.

    1996-01-01

    A 10MW high temperature gas-cooled test reactor (HTR-10) is now being projected by the Institute of Nuclear Energy Technology within China's National High Technology Programme. The Construction Permit of HTR-10 was issued by the Chinese nuclear licensing authority around the end of 1994 after a period of about one year of safety review of the reactor design. HTR-10 is the first high temperature gas-cooled reactor (HTGR) to be constructed in China. The purpose of this test reactor project is to test and demonstrate the technology and safety features of the advanced modular high temperature reactor design. The reactor uses spherical fuel elements with coated fuel particles. The reactor unit and the steam generator unit are arranged in a ''side-by-side'' way. Maximum fuel temperature under the accident condition of a complete loss of coolant is limited to values much lower than the safety limit set for the fuel element. Since the philosophy of the technical and safety design of HTR-10 comes from the high temperature modular reactor design, the reactor is also called the Test Module. HTR-10 represents among others also a licensing challenge. On the one side, it is the first helium reactor in China, and there are less licensing experiences both for the regulator and for the designer. On the other side, the reactor design incorporates many advanced design features in the direction of passive or inherent safety, and it is presently a world-wide issue how to treat properly the passive or inherent safety design features in the licensing safety review. In this presentation, the licensing criteria of HTR-10 are discussed. The organization and activities of the safety review for the construction permit licensing are described. Some of the main safety issues in the licensing procedure are addressed. Among these are, for example, fuel element behaviour, source term, safety classification of systems and components, containment design. The licensing experiences of HTR-10 are of

  2. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  3. 76 FR 28780 - Ocean Transportation Intermediary License; Revocation

    Science.gov (United States)

    2011-05-18

    ... maintain a valid bond. License Number: 020656F. Name: Dulce Auto Import & Export, Inc. Address: 15316 SW... to maintain a valid bond. License Number: 019868N. Name: Zenith Logistic (USA) Inc. Address: 175-01...

  4. DESIGN AND LICENSING TRENDS OF THE GENERAL EDUCATIONAL PROGRAMS IN LATVIA

    OpenAIRE

    Mihailovs, Ivans Jānis; Krūmiņa, Aira Aija

    2016-01-01

    The general education program designing and licensing trends in Latvia in the period from 2010 to 2014 are analyzed in the article. Based on the general education program licensing data, it found that there isn’t a trend to license author’s program in primary education, while the secondary level of education author's programs are designed and licensed more often. The fact that primary education is more licensed programs in mathematics, science and technology, but in general secondary educatio...

  5. Conformation of an evaluation process for a license renovation solicitude of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Serrano R, M. L.

    2012-10-01

    So that the construction stages, of operation, closing, dismantlement and the radioactive waste disposal of a nuclear power plant (NPP) are carried out in Mexico, is necessary that the operator has a license, permission or authorization for each stage. In Mexico, these licenses, permissions or authorizations are granted by the Energy Secretariat with base in the verdict of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS). The operation licenses ar the moment effective for the reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) they will expire respectively in the year 2020 and 2025 for the Unit 1 and Unit 2, for what the CNSNS has begun its preparation before a potential solicitude of the licensee to continue the operation of the NPP-L V. Defining the process to continue and to generate the documents that would help in this phase as normalization, guides, procedures, regulations, controls, etc., is the task that intends to be carried out the regulator body so that the evaluation process is effective and efficient, so much for the same regulator body as for the licensee. This work exposes the advance that the CNSNS has in this aspect and is centered specifically in the conformation of an evaluation process of license renovation solicitude, taking as base what the regulator body of the United States of North America (US NRC) established and following to the IAEA. Also, this work includes statistical of electric power production in Mexico, licensing antecedents for the NPP-L V, a world perspective of the license renovations and the regulation of the US NRC related to the license renovation of a NPP. (Author)

  6. 48 CFR 227.7009 - Patent releases, license agreements, and assignments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Patent releases, license... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Infringement Claims, Licenses, and Assignments 227.7009 Patent releases, license agreements, and...

  7. Groundfish/Crab License Limitation Program (LLP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — As of January 1, 2000 a Federal License Limitation Program (LLP) license is required for vessels participating in directed fishing for LLP groundfish species in the...

  8. 48 CFR 252.227-7005 - License term.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false License term. 252.227-7005..., DEPARTMENT OF DEFENSE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions And... referred to in the “License Grant” clause of this contract and any and all patents hereafter issued on...

  9. AP1000R licensing and deployment in the United States

    International Nuclear Information System (INIS)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L.

    2012-01-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed

  10. 22 CFR 129.6 - Requirement for license/approval.

    Science.gov (United States)

    2010-04-01

    ... LICENSING OF BROKERS § 129.6 Requirement for license/approval. (a) No person may engage in the business of... member country of that Organization, Australia, Japan, New Zealand, or South Korea, except in the case of...

  11. Open Science: Open source licenses in scientific research

    OpenAIRE

    Guadamuz, Andres

    2006-01-01

    The article examines the validity of OSS (open source software) licenses for scientific, as opposed to creative works. It draws on examples of OSS licenses to consider their suitability for the scientific community and scientific research.

  12. A new license plate extraction framework based on fast mean shift

    Science.gov (United States)

    Pan, Luning; Li, Shuguang

    2010-08-01

    License plate extraction is considered to be the most crucial step of Automatic license plate recognition (ALPR) system. In this paper, a region-based license plate hybrid detection method is proposed to solve practical problems under complex background in which existing large quantity of disturbing information. In this method, coarse license plate location is carried out firstly to get the head part of a vehicle. Then a new Fast Mean Shift method based on random sampling of Kernel Density Estimate (KDE) is adopted to segment the color vehicle images, in order to get candidate license plate regions. The remarkable speed-up it brings makes Mean Shift segmentation more suitable for this application. Feature extraction and classification is used to accurately separate license plate from other candidate regions. At last, tilted license plate regulation is used for future recognition steps.

  13. Site Specific Vendor's License

    Data.gov (United States)

    Montgomery County of Maryland — This dataset contains information of a site-specific vendor's license which is required if an individual sells or offers to sell goods or services from a stationary...

  14. The use of U.S. NRC licensing practices for VVERs

    International Nuclear Information System (INIS)

    Popp, D.M.

    2000-01-01

    The licensing process for the upgraded Temelin I and C and Fuel designs were enhanced with the introduction of U.S. Nuclear Regulatory Commission, NRC practices. Specifically, the use of the NRC Regulatory Guide 1.70, 'Standard Format and Content Guide for Safety Analyses Reports' and NRC NUREG 0800, 'Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants', were beneficial in the development and review of Temelin licensing documentation. These standards have been used for the preparation and review of Safety Analysis Reports in the United States and also in a large number of licensing applications around the world. Both Regulatory Guide 1.70 and NUREG 0800 were developed to provide a predictable and structured approach to licensing. This paper discusses this approach and identifies the benefits to designers, writers of licensing documentation and reviewers of licensing documents. (author)

  15. Licensing systems and inspection of nuclear installations in NEA Member countries. Part 1, Description of licensing systems

    International Nuclear Information System (INIS)

    1977-01-01

    This study provides an assessment of the legislative and regulatory provisions applicable and of the practices followed in the countries concerned and is divided into two separate sections. This document is the first part only. It contains the description of national licensing and inspection systems for nuclear installations in the twenty OECD countries which have specific regulations in this field. Each analysis has been presented following a plan which is as standardised as possible so as to facilitate comparison between the national systems. Part II, which is not included in this document, contains the diagrams illustrating the steps in the licensing procedure and the duties of the bodies involved as well as certain additional documents. It also includes a table showing the sequence of the main steps in the licensing process in the countries covered by this Study

  16. Aging management review for license renewal and plant life management

    International Nuclear Information System (INIS)

    Rinckel, M.A.; Young, G.G.

    2002-01-01

    Full text: United States nuclear power plants are initially licensed for a period of 40-years. The 40-year term, which was established by the Atomic Energy Commission in the 1950s, is believed to be based on engineering judgement and is consistent with the typical amortization schedule for purchasing fossil power plants. Under 10 CFR Part 54, the license renewal rule, additional terms of 20-years may be obtained through the preparation of a license renewal application that must be reviewed and approved by the Nuclear Regulatory Commission (NRC). The license renewal rule requires that applicants perform ageing management reviews on passive long-lived structures and components to demonstrate that ageing will be managed during the period of extended operation (i.e., additional 20 years of operation). ageing of active components, which are excluded from 10 CFR Part 54, is accomplished through the Maintenance Rule, 10 CFR Part 65, using performance-based monitoring. The license renewal rule, 10 CFR Part 54, was initially published in 1991. After significant interaction with the nuclear industry from 1991 through 1994, the NRC revised the rule in 1995 to focus on passive long-lived structures and components. In 1998, the first two applications for license renewal were submitted to the NRC by Baltimore Gas and Electric for the two-unit Calvert Cliffs nuclear power plant and by Duke Energy for the three-unit Oconee nuclear power plant. In March 2000, the NRC approved the application for the two-unit Calvert Cliffs nuclear power plant for an additional 20 years. Two months later, the NRC approved the renewal of the operating licenses for the three-unit Oconee nuclear station. The NRC completed these reviews in a timely, predictable, and stable manner. As of February 2002, the NRC has approved renewal of operating licenses for eight nuclear units and has applications under review for 15 more units. Twelve additional companies have notified the NRC of their intention to seek

  17. License - PLACE | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us PLACE License License to Use This Database Last updated : 2014/07/17 You may use this database...ense terms regarding the use of this database and the requirements you must follow in using this database. The license for this datab...re Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follows: ... ...re . With regard to this database, you are licensed to: freely access part or whole of this database, and ac...quire data; freely redistribute part or whole of the data from this database; and freely create and distribute database

  18. License - RMG | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RMG License License to Use This Database Last updated : 2013/08/07 You may use this database...se terms regarding the use of this database and the requirements you must follow in using this database. The license for this databas... Alike 2.1 Japan. If you use data from this database, please be sure attribute this database as follows: Ric...Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this database..., and acquire data; freely redistribute part or whole of the data from this database; and freely create and distribute datab

  19. 10 CFR 51.97 - Final environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-Materials Licenses § 51.97 Final environmental impact statement—materials license. (a) Independent spent fuel storage installation (ISFSI...

  20. 78 FR 48458 - Notice of Reinstatement of Customs Broker License

    Science.gov (United States)

    2013-08-08

    ... DEPARTMENT OF HOMELAND SECURITY U.S. Customs and Border Protection Notice of Reinstatement of Customs Broker License AGENCY: U.S. Customs and Border Protection, Department of Homeland Security. ACTION: Reinstatement of customs broker license. SUMMARY: Notice is hereby given that a customs broker's license has...

  1. Development regulation regarding with licensing of nuclear installation

    International Nuclear Information System (INIS)

    Bambang Riyono; Yudi Pramono; Dahlia Cakrawati Sinaga

    2011-01-01

    Provisions of Article 17 paragraph (3) of Law Number 10 Year 1997 on Nuclear cleary mandates for the establishment of government regulations (GR) on Nuclear licensing containing the requirements and procedure, both from the standpoint of their utilization and installation. To use has been rising GR No.29 Year 2008 on the Use of Ionizing Radiation Sources and Nuclear Materials, while for the installation has been published PP No.43 Year 2006 on Nuclear Reactor Licensing, and BAPETEN Chairman Decree No.3 Year 2006 on Non-reactor Nuclear Installation Licensing. Based on the background of the preparation of both the aforementioned are just regulate the reactor and utilization, not yet fully meet the mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear, including other nuclear installations. For these reasons, it initiated the need for a separate regulation containing provisions concerning licensing of non-reactor nuclear installations. On the other side from the understanding the legal aspects and interpretations of the Law No.10 of 2004 on the Establishment Regulation Legislation, should be in single mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear would only produce one of the requirements and procedure for the use or installation, or a maximum of two (2) GR related licensing the use and installation. This is encourages conducted the assessing or studies related to how possible it is according to the legal aspect is justified to combine in one Nuclear licensing regulations regarding both the use and installation, by looking at the complexity of installation and wide scope of utilization of nuclear energy in Indonesia. The results of this paper is expected to provide input in the preparation of GR on licensing of nuclear installations. (author)

  2. Nuclear power plant licensing: opportunities for improvement

    International Nuclear Information System (INIS)

    1977-06-01

    On April 20, 1977, the Commission directed that recently completed licensing actions be reviewed by the staff for the purpose of identifying ways to improve the effectiveness and efficiency of NRC nuclear power plant licensing activities. This report summarizes the results of a study undertaken by an internal ad hoc Study Group established in response to that directive. The Study Group limited its considerations to safety and environmental review activities. The background, scope, assumptions and objectives of the study are discussed. A prime assumption of this study was that improvements in the efficiency should not be permitted to reduce the current quality achieved in the licensing process. This consideration underlies the conclusions and recommendations of the study

  3. 75 FR 46938 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-04

    ... Logistics LLC (NVO), 120 S. Woodland Blvd., 216, DeLand, FL 32720, Officers: Dietmar Lutte, Manager Member, (Qualifying Individual), Susan Lutte, Member, Application Type: New NVO License. Bridgeline Logistics..., (Qualifying Individual), Application Type: New OFF License. [[Page 46939

  4. Foundation for the adequacy of the licensing bases

    International Nuclear Information System (INIS)

    1991-12-01

    The objective of this report is to describe the regulatory processes that assures that any plant-specific licensing bases will provide reasonable assurance that the operation of nuclear power plants will not be inimical to the public health and safety to the end of the renewal period. It is on the adequacy of this process that the Commission has determined that a formal renewal licensing review against the full range of current safety requirements would not add significantly to safety and is not needed to assure that continued operation throughout the renewal term is not inimical to the public health and safety or common defense and security. This document illustrates in general terms how the regulatory process has evolved in major safety issue areas. It also provides examples illustrating why it is unnecessary to re-review an operating plant's basis, except for age-related degradation unique to license renewal, at the time of license renewal. The report is a supplement to the Statement of Considerations for the Nuclear Regulatory Commission's rule (10 CFR Part 54) that established the criteria and standards governing nuclear power plant license renewal

  5. Variations in teenage activities with and without a driver's license.

    Science.gov (United States)

    Preusser, D F; Leaf, W A; Ferguson, S A; Williams, A F

    2000-01-01

    High school students were surveyed every 6 months from their freshman through senior years concerning licensing, driving, and transportation to and from their various activities. Students in Delaware (learner's permit can be issued at age 15 years, 10 months; driver's license at age 16) were compared with students in Connecticut and New York (permit at age 16; license at age 16) and in New Jersey (license at age 17). During the junior year, most Delaware students, some New York and Connecticut students, and few New Jersey students were licensed. However, even during the junior year, students in the respective states did not differ significantly with respect to time spent at activities such as a paying job, homework, watching television, dating, parties, being with friends, talking on the phone, or participating in sports or school activities. Graduated licensing systems can delay full-privilege teenage licensure and reduce teenage crash rates. These systems also can increase the number of times parents and others must drive. However, the present study's results indicate that licensing delays of as much as 1 year have minimal effects on the nondriving activities of high school students.

  6. Licensing the Sun

    Science.gov (United States)

    Demski, Jennifer

    2013-01-01

    The University of San Diego (USD) and Point Loma Nazarene University (PLNU) are licensing the sun. Both California schools are generating solar power on campus without having to sink large amounts of capital into equipment and installation. By negotiating power purchasing agreements (PPAs) with Amsolar and Perpetual Energy Systems, respectively,…

  7. Technology transfer in a horizontally differentiated product-market

    NARCIS (Netherlands)

    Mukherjee, A.; Balasubramanian, N.

    1999-01-01

    This paper considers technology transfer in a Cournot-duopoly market where the firms produce horizontally differentiated products. It turns out that without the threat of imitation from the licensee, the licenser always transfers its best technology. However, the patent licensing contract consists

  8. Nuclear licensing and supervision in Germany

    International Nuclear Information System (INIS)

    1996-06-01

    The legal instrument for implementing the licensing and supervisory procedure is specified by statutory ordinances, guidelines and provisions. The licensing requirements for nuclear power plants on the final storage of radioactive wastes in the federal republic of germany are described. The nuclear facilities are subject to continuous state supervision after they have been granted. The appendix gives a brief account of the most important ordinances relating to the AtG and extracts from the Nuclear Safety Convention. (HP)

  9. 77 FR 43600 - Ocean Transportation Intermediary License Reissuances

    Science.gov (United States)

    2012-07-25

    .... License No.: 017267NF. Name: Just In Time Services, Inc. Address: 11380 NW 34th Street, Suite 100, Doral... to section 40901 of the Shipping Act of 1984 (46 U.S.C. 40101). License No.: 016201N. Name: Delta...

  10. 47 CFR 25.117 - Modification of station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Modification of station license. 25.117 Section 25.117 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses General Application Filing Requirements § 25.117...

  11. Establishment of regulatory framework for the development reactor licensing

    International Nuclear Information System (INIS)

    Jo, Jong C.; Yune, Young G.; Kim, Woong S.; Ahn, Sang K.; Kim, In G.; Kim, Hho J.

    2003-01-01

    With a trend that various types of advanced reactor designs are currently under development worldwide, the Korea Atomic Energy Research Institute has been developing an advanced reactor called ' System-integrated Modular Advanced Reactor (SMART)', which is a small sized integral type pressurized water reactor with a rated thermal power of 330 MW. To demonstrate the safety and the performance of the SMART reactor design, the SMART Research and Development Center has embarked to build a scaled-down pilot plant of SMART, called 'SMART-P' with a rated thermal power of 65 MW. In preparation for the forthcoming applications for both construction permit and operating license of SMART-P in the near future, the Korea Institute of Nuclear Safety is developing a new regulatory framework for licensing review of such a development reactor, which covers establishment of licensing process, identification and resolution of technical and safety issues, development of regulatory evaluation or verification-purpose computer codes and analytical methods, and establishment of design-specific, general design and operating criteria, regulations, and associated regulatory guides. This paper presents the current activities for establishing a regulatory framework for the licensing of a research and development reactor. Discussions are made on the SMART-P development program, the current Korean regulatory framework for reactor licensing, the SMART-P licensing-related issues, and the approach and strategy for developing an effective regulatory framework for the SMART-P licensing

  12. Practical issues in structuring seismic licensing and acquisition agreements

    International Nuclear Information System (INIS)

    Lawrence, M.A.

    1999-01-01

    Some issues facing the geophysical industry in the area of licensing and acquisition agreements are discussed, focusing on a very large business segment of the industry called 'non-exclusive' seismic data (commonly referred to as SPEC data). A historical perspective of the industry in the Gulf of Mexico is presented, highlighting some important aspects of data licenses. The benefits of licensing three-dimensional data to the exploration industry include: (1) economy of scale, (2) 3-D is more affordable, (3) reduced barriers to entry by independents, and (4) improved success rates and reduced risk. A list of 'SPEC' companies in the Gulf of Mexico is provided and the data licensing process is outlined. There are two basic types of seismic data use licenses. The first is for a single, one-time transaction, and the other (which is more prevalent), covers multiple use licenses contemplated over a period of time. This paper briefly outlined the meaning of some important terms usually found in a license agreement, among them ownership, rights of licensee, term, disclosure to third parties, and transfer. International 'SPEC' programs and the requirements for a successful 'SPEC' program are described. The requirements include: a stable host government, reliable, competitive system of concession offerings, long term scheduled offerings, clear, consistent, and acceptable concession terms to oil and gas companies, and consistent, fair and timely method of evaluating bids and awarding concessions. 001CA9901758

  13. Licensing decisions and safety research related to LMFBR accidents

    International Nuclear Information System (INIS)

    Denise, R.P.; Speis, T.P.; Kelber, C.N.; Curtis, R.T.

    1977-01-01

    The licensing approach which ensures adequate protection of the public health and safety against serious accidents is described. This paper describes the role of core melt and core disruptive accidents in the design, safety research, and licensing processes, using the Clinch River Breeder Reactor (CRBR) as a focal point. Major design attention is placed on the prevention of these accidents so that the probability of core melt accidents is reduced to a sufficiently low level that they are not treated as design basis accidents. Additional requirements are placed upon the design to further reduce residual risk. This licensing process is supported by a confirmatory research program designed to provide an independent basis for licensing judgements. It has as a goal the resolution of generic safety issues prior to the establishment of a commercial LMFBR industry. The program includes accident analysis, experiments in materials interactions, aerosol transport and system integrity and planning for new safety test facilities. The problems are approached in a multi-disciplinary functional manner that identifies key safety issues and centralizes efforts to resolve them. The near term objectives of the program support the licensing of the Clinch River Breeder Reactor (CRBR) and the proposed Prototype Large Breeder Reactor (PLBR). The long term objectives of the program support the licensing of commercial LMFBRs during the late 1980's and beyond. This safety research is designed to provide an independent basis for the licensing judgements which must be made by the Nuclear Regulatory Commission

  14. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  15. Use of modeling in repository licensing

    International Nuclear Information System (INIS)

    McGarry, J.M. III; Echols, F.S.

    1995-01-01

    A review of the regulatory history of the Nuclear Regulatory Commission (NRC) regulations applicable to the licensing of a geologic repository, as well as a review of NRC administrative (licensing) decisions and federal case law, support the NRC's use of simplified models, in appropriate circumstances, which provide well-documented and reasonably conservative bounding assumptions, together with the use of expert judgement, natural analogues, and other aids to supplement available information, in reaching its reasonable assurance determination whether the public health and safety will be adequately protected if the Yucca Mountain, Nevada site should be licensed for development as a geologic repository. Specific examples are provided to assist the reader to better understand how such qualitative concepts as open-quote reasonable assurance close-quote, open-quote reasonably conservative close-quote, and open-quote adequate close-quote protection are used in an administrative context to resolve technical issues

  16. 76 FR 38463 - SAFE Mortgage Licensing Act: Minimum Licensing Standards and Oversight Responsibilities

    Science.gov (United States)

    2011-06-30

    ... housing laws that address the dramatic rise in mortgage delinquencies and foreclosures in the residential... regarding the status and employment history of all state-licensed and federally loan originators, as well as...

  17. Credentialing, Licensing, and Education

    Science.gov (United States)

    ... V W X Y Z Credentialing, Licensing, and Education Share: On This Page The Bottom Line Credentials, ... and practices that chiropractors are allowed to perform. Education and Training Professional organizations in some complementary health ...

  18. Demarcation of the licensing and supervisory procedures for nuclear engineering installations

    International Nuclear Information System (INIS)

    Schattke, H.

    1986-01-01

    The remarks can be summed up under 12 points: 1) The protective purpose outlined in Paragraph 1 No. 2 of the Atomic Energy Law is the top priority for both licensing and regulatory authorities. 2) Both authorities must aim at the best possible prevention of hazards and precautions against risks. 3) The licensing procedures cover applications for licenses, the regulatory procedures check and supervise actual activities. 4) The licensing procedures take precedence in chronology and in substance over the regulatory procedure. 5) The licensing procedure is a preliminary check on the intention to carry out nuclear activities before the event; whereas the regulatory procedure controls the licensee after the event to ensure that the latter's activities really do conform to the framework laid down in the license. 6) The licensing procedure must be verified by state supervision with regard to its prognostic activity. 7) The examination criteria are largely identical for both the authorites. 8) The examination tools for the licensing and regulatory authorities also coincide to a large extent. Legal differences in the possible means of enforcement have no effect in practice. 9) Decisions made by either authority can be either in the licensee's favour or to its disadvantage. Nevertheless, the contents of decisions differ widely between the two authorities. 10) The regulatory authorities execute and prepare the decisions of the licensing authorites. 11) Licensing decisions can be designated static/prognostic, whereas regulatory measures accompany the actual performance of the plant and the operating personnel in a dynamic/controlling manner. 12) Regulatory instructions are usually of a temporary nature, whereas licensing actions are permanent as a rule. (orig.) [de

  19. To License or Not to License Revisited: An Examination of State Statutes Regarding Private Investigators and Digital Examiners

    OpenAIRE

    Thomas Lonardo; Doug White; Alan Rea

    2009-01-01

    In this update to the previous year's study, the authors examine statutes that regulate, license, and enforce investigative functions in each US state. After identification and review of Private Investigator licensing requirements, the authors find that very few state statutes explicitly differentiate between Private Investigators and Digital Examiners. After contacting all state agencies the authors present a distinct grouping organizing state approaches to professional Digital Examiner lice...

  20. Licensing schedule for away-from-reactor (AFR) spent fuel storage facilities

    International Nuclear Information System (INIS)

    Gray, P.L.

    1981-08-01

    The Nuclear Regulatory Commission has authority to issue licenses for Away-From-Reactor (AFR) installations for the storage of spent nuclear fuel. This report presents a detailed estimate of the time required to prosecute a licensing action. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  1. License - PGDBj - Ortholog DB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us PGDBj - Ortholog DB License License to Use This Database Last updated : 2017/03/07 You may use this database...cifies the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons A...ttribution-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...hare Alike 4.0 International is found here . With regard to this database, you are licensed to: freely acces

  2. 75 FR 48686 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-08-11

    ...: New NVO License. Maritime and Intermodal Logistics Systems, Inc. dba MILS dba Fesco Integrated..., Senior Vice President/General Manager (Qualifying Individual), Kenryo Senda, President/CEO, Application...: New NVO & OFF License. Rado International, Inc. dba Rado Logistics (NVO & OFF), 2251 Sylvan Road...

  3. Collegiate Licensing in Canada and the Statutory Advantage.

    Science.gov (United States)

    Burshtein, Sheldon

    1985-01-01

    Discusses a specific provision in a Canadian statute enabling universities and other educational institutions to obtain protection and financial gain in a collegiate licensing program, an advantage not held in other countries or by other trademark licensers in Canada. (MSE)

  4. A BWR licensing experience in the USA

    International Nuclear Information System (INIS)

    Powers, J.; Ogura, C.; Arai, K.; Thomas, S.; Mookhoek, B.

    2015-09-01

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  5. A BWR licensing experience in the USA

    Energy Technology Data Exchange (ETDEWEB)

    Powers, J.; Ogura, C. [Toshiba America Nuclear Energy, Charlotte, North Carolina (United States); Arai, K. [Toshiba Corporation, Yokohama, Kanagawa (Japan); Thomas, S.; Mookhoek, B., E-mail: jim.powers@toshiba.com [Nuclear Innovation North America, Lake Jackson, Texas (United States)

    2015-09-15

    The US-Advanced Boiling Water Reactor (A BWR), certified by the United States Nuclear Regulatory Commission (US NRC), is a third generation, evolutionary boiling water reactor design which is the reference for the South Texas Project Units 3 and 4 (STP3-4) Combined License Application (Cola). Nuclear Innovation North America (Nina) is the License Applicant for this new build project, and Toshiba is the selected primary technology contractor. The STP3-4 project has finished the US NRC technical review of the Cola through the final meeting of the Advisory Committee on Reactor Safeguards (ACRS), and the Final Safety Evaluation Report (FSER) is scheduled to be issued by the US NRC in the middle of 2015. The next steps are to support the Mandatory Hearing process, and voting by the NRC commissioners on the motion to grant the Combined License, which is scheduled beginning of 2016 according to US NRC schedule as of March 30, 2015. This paper summarizes the history and progress of the US-A BWR licensing, including the experiences of the Licensee, Nina, and Toshiba as the Epc team worked through the Code of Federal Regulations Title 10 (10-Cfr) Part 52 process, and provides some perspectives on how the related licensing material would also be of value within a 10-Cfr Part 50, two-step process to minimize schedule and financial risks which could arise from ongoing technical developments and regulatory reviews. (Author)

  6. The end game must end before license renewal begins

    International Nuclear Information System (INIS)

    Allen, S.R.; Edwards, D.W.

    1995-01-01

    The quest for a process and strategy to achieve license renewal was begun in the mid-1980s with the view that renewal was an imperative. A major portion of the nation's future electric supply seemed to be at stake. For plants who were becoming noncompetitive because of annual capital recovery, license renewal also appeared as the means of survival. These two perceptions led to a third: License renewal should be sought immediately upon completion of the first 20 yr of operation. Although the basic engineering premise of license renewal remains sound, the perceptions regarding timing of an application may be incorrect. This paper suggests that a gauntlet of uncertainty exists for all plants. Further, it is most severe between the 20th and 30th years of operation. Thus, the competitive viability of the plant must be sustained for most of the initial term before license renewal can become a serious option

  7. Economics of license renewal in the U.S. - entergy's perspective

    International Nuclear Information System (INIS)

    Young, Garry G.

    2003-01-01

    License renewal of operating nuclear plants in the United States has become one of the most successful U.S. nuclear regulatory activities in the past few years. In 1995, the U.S. Nuclear Regulatory Commission (NRC) published a revised rule in 10 CFR Part 54 that provided the requirements for an operating nuclear plant to seek license renewal. At that time, many people believed that only a select few operating nuclear plants would pursue license renewal and that most plants would operate for no more than 40 years. By mid-2003, the owners of approximately 52% of the U.S. nuclear fleet of 103 operating nuclear plants have decided to pursue license renewal and more are expected to follow. This change in direction since 1995 can be attributed to the improving economics of U.S. nuclear power plant operation and to the improved regulatory process resulting from the 1995 revision to 10 CFR Part 54. In 2000, Entergy submitted a license renewal application for Arkansas Nuclear One, Unit 1 (ANO-1). This application was the third to be submitted to the NRC at a time when it was still unclear how successful the regulatory process might be. However, less than 17 months later, in June 2001, the NRC granted a renewed operating license for ANO-1 at a total cost of approximately $11 million. Due in part to the ANO-1 license renewal success, Entergy now has tentative plans to pursue license renewal for the entire fleet of operating nuclear power plants. Without license renewal, Entergy's current nuclear fleet capacity of approximately 9,000 MW(e) would begin to decline in 2012. With license renewal, Entergy's nuclear fleet capacity can remain in place until 2032. This projection does not include the expected improvements in capacity due to power uprate that is currently planned. The combination of power uprate and license renewal will add significant economic value to Entergy's nuclear fleet. One of the major factors in strong performance is capacity factor. In 1990, the average

  8. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  9. Economic implications of nuclear plant license renewal in the U.S

    International Nuclear Information System (INIS)

    Smith, L.J.

    2001-01-01

    The NRC and the nuclear industry struggled for many years with the development of a viable license renewal rule. Now that a workable rule appears to have been developed, and the first license renewal applicants have received renewed licenses, the floodgates have opened and a large number of nuclear utilities have announced intentions to seek renewed NRC operating licenses. In this time when profound changes are being experienced in the electric generation markets in the United States, nuclear plant license renewal can have several economic effects that should be considered by utilities prior to the pursuit of an NRC license renewal. This paper examines some of the factors that may be affected by the prospect of an additional 20-year operating life of a nuclear plant. (author)

  10. Allegheny County Dog Licenses

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — A list of dog license dates, dog breeds, and dog name by zip code. Currently this dataset does not include City of Pittsburgh dogs.

  11. Appendix I. The commons deeds of the licenses (release 3.0, unported version)

    OpenAIRE

    2014-01-01

    taken from http://creativecommons.org/licenses/by/3.0 taken from http://creativecommons.org/licenses/by-sa/3.0 taken from http://creativecommons.org/licenses/by-nd/3.0 taken from http://creativecommons.org/licenses/by-nc/3.0 taken from http://creativecommons.org/licenses/by-nc-sa/3.0 taken from http://creativecommons.org/licenses/by-nc-nd/3.0

  12. Licensing the California low-level radioactive waste disposal facility

    International Nuclear Information System (INIS)

    Dressen, A.L.; Serie, P.J.; Junkert, R.

    1992-01-01

    California has made significant progress toward the issuance of a license to construct and operate the Southwestern Compact's low-level radioactive waste disposal facility. However, obstacles to completing construction and preparing to receive waste still exist. This paper will describe the technical licensing issues, EIR/S process, political events, and public interactions that have impacted on California regulators' ability to complete the license application review and reach a decision on issuing a license. Issues associated with safely and liability evaluations, finalization of the environmental impact report, and land transfer processes involving multiple state, federal, and local agencies will be identified. Major issues upon which public and political opposition is focusing will also be described. (author)

  13. 77 FR 20398 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-04-04

    ...), Svi Soudai, Manager, Application Type: New OFF License. Armada USA, LLC dba Armada Logistics (NVO... Logistics (NVO & OFF), 435 Division Street, Elizabeth, NJ 07076, Officer: Carlos E. Feliu, President.../Treasurer, (Qualifying Individual), Application Type: New NVO License. HYC Logistics, Inc. (NVO & OFF), 2600...

  14. 76 FR 10594 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-02-25

    ... 515, effective on the corresponding date shown below: License Number: 2739NF. Name: Alison Transport... to maintain valid bonds. License Number: 2763F. Name: Logistics & Transportation Services Inc... Mohawk Global Logistics (ROC). Address: 52 Marway Circle, Suite 1, Rochester, NY 14624. Date Revoked...

  15. 78 FR 56229 - Ocean Transportation Intermediary License Revocations and Terminations

    Science.gov (United States)

    2013-09-12

    .... 40101) effective on the date shown. License No.: 004306N. Name: International Transport Services, Inc.... License No.: 020272NF. Name: CCT Corporation dba CCT Marine dba CCT Global Logistics. Address: 11250 NW... maintain valid bonds. License No.: 024023F. Name: OES Logistics, Inc Address: 10900 E. 183rd Street, 130...

  16. The Case against a Smoker's License

    OpenAIRE

    Chapman, Simon

    2012-01-01

    BACKGROUND TO THE DEBATE: Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers desig...

  17. The Case against a Smoker's License

    OpenAIRE

    Collin, J.

    2012-01-01

    Background to the debate: Tobacco continues to kill millions of people around the world each year and its use is increasing in some countries, which makes the need for new, creative, and radical efforts to achieve the tobacco control endgame vitally important. One such effort is discussed in this PLOS Medicine Debate, where Simon Chapman presents his proposal for a "smoker's license" and Jeff Collin argues against. Chapman sets out a case for introducing a smart card license for smokers desig...

  18. Personality traits of Turkish handgun license applicants.

    Science.gov (United States)

    Selek, Salih; Can, Serdar S; Yabanoglu, Ihsan

    2012-10-01

    Several theories have sought to explain the motivations for handgun possession and the relationship with personality. Perception of handguns also has cultural variations. The aim of the study is to evaluate handgun license applicants' personality profiles. 109 handgun license applicants were included in the study. Temperament and Character Inventory (TCI) scores of the applicants were recorded. Scores were compared with Turkish and American normative data for the Inventory. The study group had significantly lower subscores on novelty seeking, harm avoidance, and higher subscores on reward dependence and persistence compared to Turkish norms and significantly lower subscores on novelty seeking, reward dependence, and self-directedness compared to American norms. Results indicate that Turkish handgun license applicants' personality features are more similar to American norms.

  19. License - Taxonomy Icon | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Taxonomy Icon License License to Use This Database Last updated : 2013/3/21 You may use this database...the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribut...ion 2.1 Japan . If you use data from this database, please be sure attribute this database as follows: Taxon...ative Commons Attribution 2.1 Japan is found here . With regard to this database,

  20. License - RGP gmap98 | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP gmap98 License License to Use This Database Last updated : 2015/02/12 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as foll...on-Share Alike 2.1 Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this datab

  1. License - ChIP-Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us ChIP-Atlas License License to Use This Database Last updated : 2016/06/24 You may use this database...e license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attributio...n-Share Alike 4.0 International . If you use data from this database, please be sure attribute this database...national is found here . With regard to this database, you are licensed to: freely access part or whole of this database

  2. LICENSE PLATE LOCALIZATION USING GABOR FILTERS AND NEURAL NETWORKS

    OpenAIRE

    Sami Ktata; Faouzi Benzarti; Hamid Amiri

    2013-01-01

    Vehicle License Plate Detection (LPD) is an important step for the vehicle plate recognition which can be used in the intelligent transport systems. Many methods have been proposed for the detection of license plates based on: Mathematical morphology, Discrete Wavelet Transform, Hough Transform and others. In general, an LPR system includes four main parts: Vehicle image acquisition, license plate detection, character segmentation and character recognition. In this study, we present a robust ...

  3. 76 FR 44330 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2011-07-25

    .... Nguyen, Secretary/CFO, Application Type: New NVO & OFF License. Atlas Logistics LLC (NVO & OFF), 2801 NW...), Application Type: New NVO & OFF License. Bulk Cargo Services & Logistics Inc. (OFF), 15400 N.E. 103rd Drive..., Member/Chief Executive Manager, (Qualifying Individual), Stina Storr, Member/ Managing Member...

  4. 77 FR 18815 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-03-28

    ... NVO License. American Patriot Lines, Inc. dba Tier One Logistics (NVO), 8616 La Tijera Boulevard, 401..., AL 36608. Officer: Samford T. Myers, Manager (Qualifying Individual). Application Type: New NVO & OFF License. Bluesea Logistics Corporation (NVO), 327 Elizabeth Avenue, Apt. A, Monterey Park, CA 91755-2044...

  5. 25 CFR 141.9 - Application for license renewal.

    Science.gov (United States)

    2010-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FINANCIAL ACTIVITIES BUSINESS PRACTICES ON... the applicant has made as a reservation business owner and the applicant's present fitness to reside... pending consideration of application for license renewal. (c) Prior to expiration of the existing license...

  6. The licensing procedure under Atomic Energy Law

    International Nuclear Information System (INIS)

    Ronellenfitsch, M.

    1983-01-01

    This post-doctoral thesis of 1981 has been updated to include developments in this field up to the year 1983. The author discusses in detail all questions relating to the peaceful uses of nuclear energy in the Federal Republic of Germany, predominantly from the point of view of administrative law. He investigates nuclear energy and its contribution to electricity supplies with a view to other energy sources, renewable energy sources, alternative energy policies, nuclear fuel and the fuel cycle, development of the nuclear industry, nuclear power stations in operation, under construction, or in development. Following a survey of the nuclear controversy, both on the national and the international level, the author reviews the legal system and arising controversies in the Federal Republic of Germany, defining the purpose of this thesis to be the systematic analysis of the available legal instruments, in order to show structural deficiencies in the planning law relating to nuclear power stations, and thus reasons of ambiguities within the licensing procedure. The author studies the following terms and requirements: licensing requirements and licensability, the licensing method and scenario, the legal character of licences, their contents and effects within the stepwise procedure, and due publication. (HSCH) [de

  7. Image simulation for automatic license plate recognition

    Science.gov (United States)

    Bala, Raja; Zhao, Yonghui; Burry, Aaron; Kozitsky, Vladimir; Fillion, Claude; Saunders, Craig; Rodríguez-Serrano, José

    2012-01-01

    Automatic license plate recognition (ALPR) is an important capability for traffic surveillance applications, including toll monitoring and detection of different types of traffic violations. ALPR is a multi-stage process comprising plate localization, character segmentation, optical character recognition (OCR), and identification of originating jurisdiction (i.e. state or province). Training of an ALPR system for a new jurisdiction typically involves gathering vast amounts of license plate images and associated ground truth data, followed by iterative tuning and optimization of the ALPR algorithms. The substantial time and effort required to train and optimize the ALPR system can result in excessive operational cost and overhead. In this paper we propose a framework to create an artificial set of license plate images for accelerated training and optimization of ALPR algorithms. The framework comprises two steps: the synthesis of license plate images according to the design and layout for a jurisdiction of interest; and the modeling of imaging transformations and distortions typically encountered in the image capture process. Distortion parameters are estimated by measurements of real plate images. The simulation methodology is successfully demonstrated for training of OCR.

  8. Licensing and accident reviews for an HNEC

    International Nuclear Information System (INIS)

    Clark, R.G.

    1978-09-01

    The purpose of this review was to identify siting or other concerns that may indicate limitations on the ability to license a nuclear energy center at Hanford. Several studies on nuclear energy centers have been completed and some have included licensing (regulatory) aspects of siting nuclear power centers. This review however, was primarily to identify any limitations that may affect licensing specifically at an HNEC. The scope included examining existing criteria for siting nuclear facilities, including single reactor and multireactor (multi-unit) sites. To fill a void in other analyses and to gain some perspective on another impact of an HNEC, the scope was extended to analyze the consequences within the HNEC, of a class nine accident at a unit at one site. A predictive model utilized in this analysis was developed from meteorological parameters based on thirty years of meteorological records at Hanford. From this analysis, additional perspective was developed on the relative severity of the effects of rare events, both man made and from unstable conditions in nature, on the operation of (and the ability to license) an energy center at Hanford

  9. A quantitative integrated assessment of pollution prevention achieved by integrated pollution prevention control licensing.

    Science.gov (United States)

    Styles, David; O'Brien, Kieran; Jones, Michael B

    2009-11-01

    This paper presents an innovative, quantitative assessment of pollution avoidance attributable to environmental regulation enforced through integrated licensing, using Ireland's pharmaceutical-manufacturing sector as a case study. Emissions data reported by pharmaceutical installations were aggregated into a pollution trend using an Environmental Emissions Index (EEI) based on Lifecycle Assessment methodologies. Complete sectoral emissions data from 2001 to 2007 were extrapolated back to 1995, based on available data. Production volume data were used to derive a sectoral production index, and determine 'no-improvement' emission trends, whilst questionnaire responses from 20 industry representatives were used to quantify the contribution of integrated licensing to emission avoidance relative to these trends. Between 2001 and 2007, there was a 40% absolute reduction in direct pollution from 27 core installations, and 45% pollution avoidance relative to hypothetical 'no-improvement' pollution. It was estimated that environmental regulation avoided 20% of 'no-improvement' pollution, in addition to 25% avoidance under business-as-usual. For specific emissions, avoidance ranged from 14% and 30 kt a(-1) for CO(2) to 88% and 598 t a(-1) for SO(x). Between 1995 and 2007, there was a 59% absolute reduction in direct pollution, and 76% pollution avoidance. Pollution avoidance was dominated by reductions in emissions of VOCs, SO(x) and NO(x) to air, and emissions of heavy metals to water. Pollution avoidance of 35% was attributed to integrated licensing, ranging from between 8% and 2.9 t a(-1) for phosphorus emissions to water to 49% and 3143 t a(-1) for SO(x) emissions to air. Environmental regulation enforced through integrated licensing has been the major driver of substantial pollution avoidance achieved by Ireland's pharmaceutical sector - through emission limit values associated with Best Available Techniques, emissions monitoring and reporting requirements, and

  10. License - PSCDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...wnload License Update History of This Database Site Policy | Contact Us License - PSCDB | LSDB Archive ...

  11. License - DMPD | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...ownload License Update History of This Database Site Policy | Contact Us License - DMPD | LSDB Archive ...

  12. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    International Nuclear Information System (INIS)

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-01-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  13. 77 FR 24712 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2012-04-25

    ... Global Logistics LLC (OFF), 9816 Whithorn Drive, Suite B, Houston, TX 77095, Officer: Herbert R. Hogg, Operating Manager (Qualifying Individual), Application Type: New OFF License. Toyo Logistics America, Inc... Individual), Application Type: New NVO License. Choiceone Logistics, Inc. (NVO & OFF), 10025 NW 116th Way, 17...

  14. 75 FR 69080 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-11-10

    ... license as a Non-Vessel-Operating Common Carrier (NVO), and/or Ocean Freight Forwarder (OFF)--Ocean..., Building 14-A, Kenner, LA 70062, Officers: Gary J. Cheramie, President (Qualifying Individual), George...: License Transfer. Total Global Solutions, Inc. (NVO & OFF), 4290 Bells Ferry Road 224, Suite 106, Kennesaw...

  15. 75 FR 61757 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2010-10-06

    ...), Jinho Um, CFO. Application Type: New NVO & OFF License. Junction Int'l Logistics, Inc. (NVO), 17870 Castleton Street, Suite 107, City of Industry, CA 91748. Officers: Charles Kuo, Secretary (Qualifying.... Application Type: New NVO & OFF License. Red Arrow Consulting, Inc. dba Red Arrow Logistics (OFF), 14925 SE...

  16. 78 FR 6325 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-01-30

    .... Application Type: New NVO & OFF License. Naca Logistics (USA), Inc. dba Brennan International Transport, dba...). Application Type: New NVO & OFF License. Miami Freight & Logistics Services, Inc. (NVO & OFF), 3630 NW 76th... World Shipping, dba OWS, dba Ocean Express, dba Oceanexpress Vanguard Logistics Services, dba Vanguard...

  17. NRC Licensing Status Summary Report for NGNP

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne Leland [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kinsey, James Carl [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  18. Public licenses and public domain as alternatives to copyright

    OpenAIRE

    Köppel, Petr

    2012-01-01

    The work first introduces the area of public licenses as a space between the copyright law and public domain. After that, consecutively for proprietary software, free and open source software, open hardware and open content, it maps particular types of public licenses and the accompanying social and cultural movements, puts them in mutual as well as historical context, examines their characteristics and compares them to each other, shows how the public licenses are defined by various accompan...

  19. Workplace Violence and Job Outcomes of Newly Licensed Nurses

    OpenAIRE

    Chang, Hyoung Eun; Cho, Sung-Hyun

    2016-01-01

    Purpose: The purpose of this study was to examine the prevalence of workplace violence toward newly licensed nurses and the relationship between workplace violence and job outcomes. Methods: An online survey was conducted of newly licensed registered nurses who had obtained their license in 2012 or 2013 in South Korea and had been working for 5–12 months after first being employed. The sample consisted of 312 nurses working in hospitals or clinics. The Copenhagen Psychosocial Questionnaire...

  20. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  1. Advanced CANDU reactor pre-licensing progress

    International Nuclear Information System (INIS)

    Popov, N.K.; West, J.; Snell, V.G.; Ion, R.; Archinoff, G.; Xu, C.

    2005-01-01

    The Advanced CANDU Reactor (ACR) is an evolutionary advancement of the current CANDU 6 reactor, aimed at producing electrical power for a capital cost and at a unit-energy cost significantly less than that of the current reactor designs. The Canadian Nuclear Safety Commission (CNSC) staff are currently reviewing the ACR design to determine whether, in their opinion, there are any fundamental barriers that would prevent the licensing of the design in Canada. This CNSC licensability review will not constitute a licence, but is expected to reduce regulatory risk. The CNSC pre-licensing review started in September 2003, and was focused on identifying topics and issues for ACR-700 that will require a more detailed review. CNSC staff reviewed about 120 reports, and issued to AECL 65 packages of questions and comments. Currently CNSC staff is reviewing AECL responses to all packages of comments. AECL has recently refocused the design efforts to the ACR-1000, which is a larger version of the ACR design. During the remainder of the pre-licensing review, the CNSC review will be focused on the ACR-1000. AECL Technologies Inc. (AECLT), a wholly-owned US subsidiary of AECL, is engaged in a pre-application process for the ACR-700 with the US Nuclear Regulatory Commission (USNRC) to identify and resolve major issues prior to entering a formal process to obtain standard design certification. To date, the USNRC has produced a Pre-Application Safety Assessment Report (PASAR), which contains their reviews of key focus topics. During the remainder of the pre-application phase, AECLT will address the issues identified in the PASAR. Pursuant to the bilateral agreement between AECL and the Chinese nuclear regulator, the National Nuclear Safety Administration (NNSA) and its Nuclear Safety Center (NSC), NNSA/NSC are reviewing the ACR in seven focus areas. The review started in September 2004, and will take three years. The main objective of the review is to determine how the ACR complies

  2. License - TMBETA-GENOME | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TMBETA-GENOME License License to Use This Database Last updated : 2015/03/09 You may use this database... the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attribu...tion-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as f....1 Japan . The summary of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database

  3. License - KAIKOcDNA | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us KAIKOcDNA License License to Use This Database Last updated : 2014/10/08 You may use this database... license terms regarding the use of this database and the requirements you must follow in using this database...-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as follo...e Alike 2.1 Japan is found here . With regard to this database, you are licensed to: freely access part or whole of this database..., and acquire data; freely redistribute part or whole of the data from this database; a

  4. License - RGP caps | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP caps License License to Use This Database Last updated : 2015/05/12 You may use this database...license terms regarding the use of this database and the requirements you must follow in using this database...Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as follow...ommons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, you are licensed to: ...freely access part or whole of this database, and acquire data; freely redistribute part or whole of the data from this database

  5. License - DB-SPIRE | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us DB-SPIRE License License to Use This Database Last updated : 2017/02/16 You may use this database...license terms regarding the use of this database and the requirements you must follow in using this database...Share Alike 4.0 International . If you use data from this database, please be sure attribute this database a...eative Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, you a...re licensed to: freely access part or whole of this database, and acquire data; freely redistribute part or

  6. License - RGP physicalmap | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us RGP physicalmap License License to Use This Database Last updated : 2015/07/07 You may use this database...es the license terms regarding the use of this database and the requirements you must follow in using this database.... The license for this database is specified in the Creative Commons Attri...bution-Share Alike 2.1 Japan . If you use data from this database, please be sure attribute this database as...ry of the Creative Commons Attribution-Share Alike 2.1 Japan is found here . With regard to this database, y

  7. Roundtable discussion: Materials management issues supporting licensing renewal

    International Nuclear Information System (INIS)

    1991-01-01

    The purpose of this technical session is to discussion the relationships between nuclear materials management/procurement engineering and plant license renewal. The basis for the discussion is DG-1009 'Standard format and content of technical information for applications to renew nuclear power plant operating licenses', dated 12/90

  8. 78 FR 32650 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-05-31

    ... Change Abaco Logistics Corporation (OFF), 8051 NW 67th Street, Miami, FL 33166, Officers: Manuel T. Soto...: New NVO & OFF License Star Cluster Logistics (NVO & OFF), 4 Executive Circle, Suite 170, Irvine, CA... License Straight Forwarding, Inc. (NVO & OFF), 20974 Currier Road, City of Industry, CA 91789, Officer: Yi...

  9. 77 FR 43599 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-07-25

    ... OFF License. Logistics International Parcel Shipping Transport LLC (NVO), 182 West Melrose Avenue, 2... Schwartz, Director, Application Type: New OFF License. Brox Logistics USA, LLC (NVO,) 244 5th Avenue, V-280... Agency Corporation, dba C&F Worldwide Logistics. Cargois Inc. dba Star Vision Logis (NVO), 2700 Coyle...

  10. 76 FR 28778 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-18

    ... Individual), Application Type: New NVO & OFF License. Asian Link Logistics, LLC dba Best Global (NVO & OFF... Type: New NVO License. Hansa Meyer Global Transport USA, LLC dba Hansa Shipping LLC, (OFF), 712 Main... & Logistics (Private) Limited dba, Nashrah Shipping and Logistics (NVO), Mezzanine Floor, Trade Ave., Tower 1...

  11. 78 FR 35635 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2013-06-13

    ...: April 28, 2013. Reason: Failed to maintain a valid bond. License No.: 15328N. Name: Apex World Transport... bond. License No.: 020529F. Name: KN Special Logistics, Inc. Address: 22780 Indian Creek Drive, Suite... No.: 022034N. Name: Competition Transport Inc. Address: 1326 Spruce Avenue, Orlando, FL 32824. Date...

  12. 76 FR 16421 - Ocean Transportation Intermediary License; Revocation

    Science.gov (United States)

    2011-03-23

    ...: 13290N. Name: Argosy Transport, Inc. Address: 5572 Lutford Circle, Westminster, CA 92683. Date Revoked...: Failed to maintain a valid bond. License Number: 015847N. Name: Straightline Logistics, Inc. Address: One... maintain a valid bond. License Number: 019288F. Name: Kairos Logistics LLC. Address: 1447 West 178th Street...

  13. 76 FR 555 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-01-05

    ...: Failed to maintain a valid bond. License Number: 021844NF. Name: Transport Logistics, Inc. Address: P.O... & Logistics. Address: 17828 S. Main Street, Carson, CA 90248. Date Revoked: November 21, 2010. Reason: Failed... 26, 2010. Reason: Failed to maintain a valid bond. License Number: 020824N. Name: Clarion Logistics...

  14. 76 FR 71035 - Ocean Transportation Intermediary License Revocation

    Science.gov (United States)

    2011-11-16

    ...: Failed to maintain a valid bond. License Number: 4346F. Name: Reefco Logistics, Inc. dba Reefco Transport.... Reason: Failed to maintain a valid bond. License Number: 019085F. Name: Hanjin Logistics, Inc. Address... Logistics. Address: 1322 E. Pacific Coast Highway, Suite B, Wilmington, CA 90744. Date Revoked: October 20...

  15. The strategy of experimental power reactor licensing in Indonesia

    International Nuclear Information System (INIS)

    Moch Djoko Birmano

    2015-01-01

    Currently, BATAN has being planned to develop Experimental Power Reactor (EPR), that is the research nuclear reactor that can generate power (electricity or heat). The EPR is planned will be built in the National Center for Research of Science and Technology (Puspiptek) area at Serpong, South Tangerang, Banten Province, with the choice of reactor types is HTGR with the power size of 10 MWth. As stated in the Act No. 10 year 1997 on Nuclear Power, that every construction and operation of nuclear reactors and other nuclear installations and decommissioning of nuclear reactors required to have a permit. Furthermore, the its implementation arrangements is regulated in Government Regulation (GR) No. 2 year 2014 on Licensing of Nuclear Installations and Nuclear Material Utilization, which contains the requirements and procedures for the licensing process since site, construction, commissioning, operation, and decommissioning, it means licensing is implemented during the activity of construction, operation and decommissioning of NPPs.While, for the more detailed licensing arrangements available in the guidelines of BAPETEN Chairman Regulation (BCR). This study was conducted to understand the legal and institutional aspects, types and stages, and the licensing process of RDE, and identify licensing strategy so that timely as planned. Methodologies used include the literature study, consultation with experts in BAPETEN, discussions in the national seminar including FGD. (author)

  16. License - Budding yeast cDNA sequencing project | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Budding yeast cDNA sequencing project License to Use This Database Last updated : 2010/02/15 You may use this databas...ional License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additiona...n the Standard License. Standard License The Standard License for this database is the license specified in ...the Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  17. License - GRIPDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...e Database Description Download License Update History of This Database Site Policy | Contact Us License - GRIPDB | LSDB Archive ...

  18. License - GETDB | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...se Database Description Download License Update History of This Database Site Policy | Contact Us License - GETDB | LSDB Archive ...

  19. An economic perspective on software licenses--open source, maintainers and user-developers

    DEFF Research Database (Denmark)

    Edwards, Kasper

    2005-01-01

    This paper presents a model for understanding behaviour of agents using and/or contributing to open source software. The model illustrates behaviour of agents under three licenses regimes: 1) The GPL, The BSD and 3) The Microsoft EULA. The latter license is not an open source license...... licenses induce different incentives and dynamics for maintainer and user-developer and the paper explains, from an economic standpoint, the mechanisms that ensure programs are developed and maintained under the three license regimes....

  20. License - JSNP | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...This Database Database Description Download License Update History of This Database Site Policy | Contact Us License - JSNP | LSDB Archive ...

  1. Decree-Law no. 49398 of 24 November 1969 - Establishment of a licensing system for nuclear activities of an industrial nature

    International Nuclear Information System (INIS)

    1969-01-01

    This decree-Law lists the nuclear activities subject to licensing in Portugal. These include: research involving use of nuclear laboratories, pilot and industrial facilities; prospecting for and exploration of radioactive ore deposits, including the production of concentrates; import and export of radioactive materials and nuclear fuels, including fabrication of the latter; nuclear reactors and power plants; trade in irradiated fuels and recycling of recovered fuels. The Decree-Law lays down that the licensing procedure for such activities will be fixed by decree. (NEA) [fr

  2. 76 FR 79682 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-12-22

    ... at (202) 523-5843 or by email at [email protected] . A.C.T. Logistics, LLC (NVO), 154-09 146th Avenue, 3rd...-President/Secretary. Application Type: License Transfer. Canyon Global Logistics, LLC (NVO & OFF), 2928-B..., General Manager, (Qualifying Individual), Oleg Ardachev, President. Application Type: New OFF License...

  3. 77 FR 37044 - Ocean Transportation Intermediary License; Revocations

    Science.gov (United States)

    2012-06-20

    ... corresponding date shown below: License Number: 2958F. Name: Elite International Transportation, Inc. Address: 15333 JFK Blvd., 6th Floor, Houston, TX 77032. Date Revoked: May 9, 2012. Reason: Failed to maintain a... Springs, FL 33166. Date Revoked: May 19, 2012. Reason: Failed to maintain a valid bond. License Number...

  4. Commitment of Licensed Social Workers to Aging Practice

    Science.gov (United States)

    Simons, Kelsey; Bonifas, Robin; Gammonley, Denise

    2011-01-01

    This study sought to identify client, professional, and employment characteristics that enhance licensed social workers' commitment to aging practice. A series of binary logistic regressions were performed using data from 181 licensed, full-time social workers who reported aging as their primary specialty area as part of the 2004 NASW's national…

  5. License - KOME | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...out This Database Database Description Download License Update History of This Database Site Policy | Contact Us License - KOME | LSDB Archive ...

  6. License - RMOS | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...out This Database Database Description Download License Update History of This Database Site Policy | Contact Us License - RMOS | LSDB Archive ...

  7. An examination of the perceived teaching competencies of novice alternatively licensed and traditionally licensed high school science teachers

    Science.gov (United States)

    Shea, Kathleen A.

    In most states, there are two routes to teacher licensure; traditional and alternative. The alternative route provides an accelerated entry into the classroom, often without the individual engaging in education coursework or a practicum. No matter the route, teaching skills continue to be learned by novice teachers while in the classroom with the guidance of a school-based mentor. In this study, the perceptions of mentor teachers of traditionally and alternatively licensed high school science teachers were compared with respect to mentees' science teaching competency. Further, the study explored the novice teachers' self-perception of their teaching competency. A survey, consisting of 56 Likert-type questions, was completed by mentors (N = 79) and novice high school science teachers (N = 83) in six northeastern states. The results revealed a statistically significant difference in the perceptions of the mentors of traditionally and alternatively licensed novice high school science teachers in the areas of general pedagogical knowledge, pedagogical content knowledge and professional growth, with more favorable perceptions recorded by mentors of traditionally licensed science teachers. There were no differences in the perceptions of the mentors with respect to novice high school teachers' content knowledge. There was no statistical difference in the self-perceptions of competency of the novice teachers. While alternative routes to licensure in science may be a necessity, the results of this study indicate that the lack of professional preparation may need to be addressed at the school level through the agency of the mentor. This study indicates that mentors must be prepared to provide alternatively licensed novice teachers with different assistance to that given to traditionally licensed novice teachers. School districts are urged to develop mentoring programs designed to develop the teaching competency of all novice teachers regardless of the route that led them

  8. Detection of pyrrolizidine alkaloids in German licensed herbal medicinal teas.

    Science.gov (United States)

    Schulz, M; Meins, J; Diemert, S; Zagermann-Muncke, P; Goebel, R; Schrenk, D; Schubert-Zsilavecz, M; Abdel-Tawab, M

    2015-06-01

    Because of the hepatotoxic, mutagenic, and cancerogenic effects of pyrrolizidine alkaloids (PAs) the German Federal Institute for Risk Assessment (BfR) recommends not to exceed a daily PA intake of 0.007 µg/kg body weight (0.42 µg/60 kg adult). In a recent study conducted by the BfR, up to 5647 µg PA/kg dried herbal material were detected in tea products marketed as food. The present study aimed at elucidating whether medicinal teas licensed or registered as medicinal products contain PAs as well. One hundred sixty-nine different commercially available medicinal teas, i.e. 19 nettle (Urtica dioica L.), 12 fennel (Foeniculum vulgare Mill.), 14 chamomile (Matricaria recutita L.), 11 melissa (Melissa officinalis L.) and 4 peppermint (Mentha piperita L.) teas as well as 109 tea mixtures were analyzed for the presence of 23 commercially available PAs. LC/MS was used for the determination of the PAs In general, the total PA contents ranging 0-5668 µg/kg. Thirty percent of the tested single-ingredient tea products and 56.9% of the tested medicinal tea mixtures were found to contain PA concentrations above the limit of quantification (LOQ) of 10 µg/kg. In 11 medicinal teas PA contents >300 µg/kg dry herb were determined thus exceeding the recommended limit for PA intake by BfR. In addition three products of the investigated tea mixtures revealed extremely high PA contents of 4227, 5137, and 5668 µg/kg. Generally, single-ingredient tea products contained much less or even no detectable amounts of PAs when compared to the tea mixtures. PAs in the range between 13 and 1080 µg/kg were also detected in five analyzed aqueous herbal infusions of the medicinal tea mixture products with the highest PA content. Two out of the five investigated herbal infusions exceeded the recommended BfR limit for PA intake. This study demonstrates clearly that also medicinal teas licensed as medicinal products may partly contain high amounts of PAs exceeding current recommendations. For

  9. 25 CFR 558.2 - Eligibility determination for granting a gaming license.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Eligibility determination for granting a gaming license. 558.2 Section 558.2 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR GAMING LICENSES AND BACKGROUND INVESTIGATIONS FOR KEY EMPLOYEES AND PRIMARY MANAGEMENT OFFICIALS GAMING LICENSES...

  10. License - ASTRA | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ... notice. About This Database Database Description Download License Update History of This Database Site Policy | Contact Us License - ASTRA | LSDB Archive ...

  11. 78 FR 28845 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2013-05-16

    ... valid bond. License No.: 018442NF. Name: AAC Perishables Logistics, Inc. Address: 6300 NW 97th Avenue.... License No.: 018640N. Name: Welley Shipping USA, Inc. Address: 17700 Castleton Street, Suite 469, City of....: 019771F. Name: InterStar Global Logistics, L.P. Address: 5839 Bender Road, Humble, TX 77396. Date Revoked...

  12. 76 FR 30360 - Ocean Transportation Intermediary License; Applicants

    Science.gov (United States)

    2011-05-25

    .... Application Type: Trade Name Change. B&O Logistics, Inc. (NVO), 19310 Pacific Gateway Drive, Torrance, CA.... Application Type: New NVO License. Charity Cargo L.L.C. (NVO & OFF), 1423 Kaleilani Street, Pearl City, HI... License. GreenLine Trade, LLC dba GreenLine Logistics (OFF), 14205 SE 36th, Suite 100, Bellevue, WA 98006...

  13. 75 FR 51074 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2010-08-18

    ... Number: 000769NF. Name: ABX Logistics (USA) Inc. Address: 7651 Esters Blvd., Suite 210, Irving, TX 75063.... Reason: Failed to maintain a valid bond. License Number: 020063N. Name: Business Solutions Partner, Inc... maintain a valid bond. License Number: 020747N. Name: Prime Logistics Int'l, Inc. Address: 8611 NW. 72nd...

  14. 77 FR 71002 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2012-11-28

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . 5G Logistics Solutions LLC..., President. Application Type: New NVO & OFF License. Bennett International Transport, L.L.C. (NVO & OFF.... Castano, COO. Application Type: New NVO & OFF License. James J. Boyle & Co. dba JJB Global Logistics Co...

  15. 75 FR 46939 - Ocean Transportation Intermediary License Revocations

    Science.gov (United States)

    2010-08-04

    ..., 2010. Reason: Failed to maintain a valid bond. License Number: 018628N. Name: Master Global Logistics... Number: 019622NF. Name: Summer Breeze Transport, Inc. Address: 1106 A1A North, Suite 100-A, Ponte Vedra...: Failed to maintain a valid bond. License Number: 021413N. Name: C&C International Logistics Inc. Address...

  16. Looking at the licensability of System 80+ in the UK

    International Nuclear Information System (INIS)

    Molnar, C.M.

    1993-01-01

    There are today no internationally-sanctioned nuclear power plant design or licensing guidelines, or acceptance criteria, available for a standard plant design that would have multi-national regulatory acceptability. On the contrary, a diversity of national regulations govern the design and licensing of nuclear power stations around the world. When licensing a nuclear facility in this environment, it is important for all parties (utility, designer and regulator) to recognise consciously that there are numerous solutions available to satisfy varying safety requirements. There is no one right-way - there are only trade-offs justified on safety, performance benefit and cost, which, taken together, fashion designs that conform to national licensing requirements. (Author)

  17. License - TogoTV | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us TogoTV License License to Use This Database Last updated : 2017/05/12 You may use this database...cense terms regarding the use of this database and the requirements you must follow in using this database. The license for this data...0 International . If you use data from this database, please be sure attribute this database as follows: Tog...on 4.0 International is found here . With regard to this database, you are licens...ed to: freely access part or whole of this database, and acquire data; freely redistribute part or whole of the data from this databa

  18. License - ConfC | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us ConfC License License to Use This Database Last updated : 2016/09/20 You may use this database...ense terms regarding the use of this database and the requirements you must follow in using this database. The license for this datab...re Alike 4.0 International . If you use data from this database, please be sure attribute this database as f... Commons Attribution-Share Alike 4.0 International is found here . With regard to this database, you are lic...ensed to: freely access part or whole of this database, and acquire data; freely redistribute part or whole of the data from this dat

  19. License withdrawn : a moral evaluation of Norwegian arms export to Turkey

    OpenAIRE

    Fixdal, Mona Christine

    1997-01-01

    License Withdrawn A Moral Evaluation of Norwegian Arms Export to Turkey On March 13, 1992, the Norwegian Foreign Ministry granted Raufoss A/S a license to export ammunition to Turkey. Two weeks later the Foreign Ministry withdrew the license, and Raufoss A/S was consequently denied the possibility to export. The aim of this thesis is to give a moral evaluation of the decision to withdraw the license for ammunition. This evaluation is partly based on the question whether it was right to ...

  20. Local licensers and recovering in VP ellipsis

    Directory of Open Access Journals (Sweden)

    Sonia Cyrino

    2005-12-01

    Full Text Available The core properties of VP ellipsis in English and Portuguese may be captured assuming that the elliptical constituent is licensed under local c-command by a verbal element in a sentence functional head. However, the lack of VP ellipsis in most Romance languages and in German, despite the existence of verb movement to sentence functional projections in these languages, suggests that a parameter is involved. Empirical evidence indicates that this parametric variation should not be attributed to a specific functional head because the functional head occupied by the verbal licenser may vary across languages and language varieties. So we will claim that the existence vs. absence of VP ellipsis in the languages considered in this study is due to the features of the functional head that intervenes between the verbal licenser and the elliptical vP phase.

  1. License - SSBD | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...thout notice. About This Database Database Description Download License Update History of This Database Site Policy | Contact Us License - SSBD | LSDB Archive ...

  2. License - SAHG | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...ut notice. About This Database Database Description Download License Update History of This Database Site Policy | Contact Us License - SAHG | LSDB Archive ...

  3. License - RPSD | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...thout notice. About This Database Database Description Download License Update History of This Database Site Policy | Contact Us License - RPSD | LSDB Archive ...

  4. 77 FR 2600 - Revocation of License of Small Business Investment Company

    Science.gov (United States)

    2012-01-18

    ... SMALL BUSINESS ADMINISTRATION Revocation of License of Small Business Investment Company Pursuant... Limited Partnership, to function as a small business investment company under the Small Business Investment Company License No. 09790431 issued to AltoTech II, L.P. on December 04, 2000 and said license is...

  5. Class I structures license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Deng, D.; Renfro, J.; Statton, J.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures, and components, in the license renewal technical Industry Reports (IRs). License renewal applicants may choose to reference these IRs in support of their plant-specific license renewal applications, as an equivalent to the integrated plant assessment provisions of the license renewal rule (10 CFR Part 54). This IR provides the technical basis for license renewal for U.S. nuclear power plant Class I structures, with the IR evaluating which structures are Class I. Seventeen structures are explicitly described and evaluated in this IR. These structures are not necessarily classified as Class I at all plants, therefore the license renewal applicant should consult this IR for correct identification

  6. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  7. Can patents prohibit research? On the social epistemology of patenting and licensing in science.

    Science.gov (United States)

    Biddle, Justin B

    2014-03-01

    A topic of growing importance within philosophy of science is the epistemic implications of the organization of research. This paper identifies a promising approach to social epistemology--nonideal systems design--and uses it to examine one important aspect of the organization of research, namely the system of patenting and licensing and its role in structuring the production and dissemination of knowledge. The primary justification of patenting in science and technology is consequentialist in nature. Patenting should incentivize research and thereby promote the development of knowledge, which in turn facilitates social progress. Some have disputed this argument, maintaining that patenting actually inhibits knowledge production. In this paper, I make a stronger argument; in some areas of research in the US--in particular, research on GM seeds--patents and patent licenses can be, and are in fact being, used to prohibit some research. I discuss three potential solutions to this problem: voluntary agreements, eliminating patents, and a research exemption. I argue against eliminating patents, and I show that while voluntary agreements and a research exemption could be helpful, they do not sufficiently address the problems of access that are discussed here. More extensive changes in the organization of research are necessary.

  8. Impact on future licensing

    International Nuclear Information System (INIS)

    Pasedag, W.F.; Postma, A.K.

    1986-01-01

    The TMI-2 accident has had a dramatic impact on the assessment of severe accidents, particularly on accident source term assumptions. TMI not only demonstrated that regulatory interest in severe accidents is appropriate, but also illustrated our limited understanding of fission product behaviour under degraded core conditions. The resulting reassessment of accident source terms has resulted in a concerted, world-wide research effort, which has produced a new source term estimation methodology. In order to assess the potential impact of the application of this methodology on regulatory requirements, a comparison with the approach used in licensing analyses is necessary. Such a comparison performed for the TMI-2 accident sequence, shows that differences in assumptions concerning accident progression far outweigh the differences in the methodology per se. In particular, the degree of conservatism incorporated into assumptions concerning operator action and containment response has over-riding influence on source term estimates. A major contribution to the impact of the new source term methodology on regulatory requirements, therefore, is its capability to provide the improved level of understanding necessary for reassessment of regulatory assumptions in this area

  9. USNRC licensing process as related to nuclear criticality safety

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1987-01-01

    The U.S. Code of Federal Regulations establishes procedures and criteria for the issuance of licenses to receive title to, own, acquire, deliver, receive, possess, use, and initially transfer special nuclear material; and establishes and provides for the terms and conditions upon which the Nuclear Regulatory Commission (NRC) will issue such licenses. Section 70.22 of the regulations, ''Contents of Applications'', requires that applications for licenses contain proposed procedures to avoid accidental conditions of criticality. These procedures are elements of a nuclear criticality safety program for operations with fissionable materials at fuels and materials facilities (i.e., fuel cycle facilities other than nuclear reactors) in which there exists a potential for criticality accidents. To assist the applicant in providing specific information needed for a nuclear criticality safety program in a license application, the NRC has issued regulatory guides. The NRC requirements for nuclear criticality safety include organizational, administrative, and technical requirements. For purely technical matters on nuclear criticality safety these guides endorse national standards. Others provide guidance on the standard format and content of license applications, guidance on evaluating radiological consequences of criticality accidents, or guidance for dealing with other radiation safety issues. (author)

  10. 78 FR 66713 - Ocean Transportation Intermediary License Applicants

    Science.gov (United States)

    2013-11-06

    ..., Washington, DC 20573, by telephone at (202) 523-5843 or by email at [email protected] . Action One Logistics, Inc..., Operating Manager (QI), Joseph Lam, Member, Application Type: New NVO License. Altex US, LLC (NVO & OFF), 1... President, Application Type: New NVO & OFF License. Andes Logistics USA LLC (NVO & OFF) 7500 NW 25 Street, 7...

  11. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Industrial and Medical Nuclear Safety; Tingle, W. [Dept. of Environment, Health, and Natural Resources, Raleigh, NC (United States). Div. of Radiation Protection

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ``Applications for the Use of Sealed Sources in Portable Gauging Devices,`` and in NMSs Policy and guidance Directive 2-07, ``Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.`` This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications.

  12. Consolidated guidance about materials licenses: Program-specific guidance about portable gauge licenses. Final report; Volume 1

    International Nuclear Information System (INIS)

    Vacca, P.C.; Whitten, J.E.; Pelchat, J.M.; Arredondo, S.A.; Matson, E.R.; Lewis, S.H.; Collins, D.J.; Santiago, P.A.; Tingle, W.

    1997-05-01

    As part of its redesign of the materials licensing process, NRC is consolidating and updating numerous guidance documents into a single comprehensive repository as described in NUREG-1539 and draft NUREG-1541. NUREG-1556, Vol. 1, is the first program-specific guidance developed for the new process and will serve as a template for subsequent program-specific guidance. This document is intended for use by applicants, licensees, and NRC staff and will also be available to Agreement States. This document supersedes the guidance previously found in draft Regulatory Guide DG-0008, ''Applications for the Use of Sealed Sources in Portable Gauging Devices,'' and in NMSs Policy and guidance Directive 2-07, ''Standard Review Plan for Applications for Use of Sealed Sources in Portable Gauging Devices.'' This final report takes a more risk-informed, performance-based approach to licensing portable gauges, and reduces the information(amount and level of detail) needed to support an application to use these devices. It incorporates many suggests submitted during the comment period on draft NUREG-1556, Volume 1. When published, this final report should be used in preparing portable gauge license applications. NRC staff will use this final report in reviewing these applications

  13. 47 CFR 87.47 - Application for a portable aircraft station license.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application for a portable aircraft station... SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.47 Application for a portable aircraft station license. A person may apply for a portable aircraft radio station license if the need...

  14. Electronic licensing filing system development and implementation experience

    International Nuclear Information System (INIS)

    Walderhaug, J.

    1993-01-01

    The Electronic Licensing Filing System (ELFS) is a microcomputer-based integrated document search and retrieval system for the Nuclear Regulatory Affairs Division of Southern California Edison (SCE). ELFS allows the user access to the current licensing basis of a subject by providing an easily searchable electronic information data base consisting of regulatory correspondence, design-bases documentation, licensing documents [updated final safety and analysis report (UFSAR) and technical specifications], and regulatory guidance or directives [10CFR, generic letters, bulletins, notices, circulars, regulatory guides, policy statements, and selected US Nuclear Regulatory Commission (NRC) regulations]. It is used in the preparation of correspondence and submittals to the NRC, 50.59 safety evaluations, design-bases reconstitution, and commitment tracking and management

  15. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Science.gov (United States)

    2013-05-20

    ... Facility Operating License No. R-103 AGENCY: Nuclear Regulatory Commission. ACTION: License renewal... the renewal of Facility Operating License No. R-103 (``Application''), which currently authorizes the... application for the renewal of Facility Operating License No. R-103, which, currently authorizes the licensee...

  16. SSM's licensing review of a spent nuclear fuel repository in Sweden

    International Nuclear Information System (INIS)

    Dverstorpand, Bjoern; Stroemberg, Bo

    2014-01-01

    On 16 March 2011 the Swedish Nuclear Fuel and Waste Management Co. (SKB) submitted license applications for a general license to construct, possess and operate a KBS-3 type spent nuclear fuel repository at the Forsmark site, in Oesthammar municipality, and an encapsulation plant in Oskarshamn municipality. The KBS-3 method, which has been developed by SKB over a period of more than 30 years, entails disposing of the spent fuel in copper canisters, surrounded by a swelling bentonite clay, at about 500 m depth in crystalline basement rock. SKB's applications are being evaluated in parallel by the Swedish Radiation Safety Authority (SSM) according to the Act on Nuclear Activities and by the Land and Environmental Court according to the Environmental Code. During the review SSM will act as an expert review body to the Land and Environmental Court in the areas of radiation protection, safety and security/non-proliferation. Both SSM and the court will produce a statement with a recommendation regarding a licensing decision and licensing conditions to the government. The government will make the final decision after consulting the municipalities concerned by SKB's facilities (municipal veto applies). The current licensing decision is just one of several licensing decisions that will be required for the repository. However it is arguably the most important one, because it is the last licensing stage with a broad societal involvement including an environmental impact assessment (EIA) process, national consultations and municipal veto for the concerned municipalities. The licensing steps to follow, should SKB be granted a license by the government, only require approval by SSM. These steps include application for start of actual construction work, test operation and routine operation. (authors)

  17. AP1000{sup R} licensing and deployment in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing

  18. Future of Nuclear Power: NRC emergency preparedness licensing activities agenda

    International Nuclear Information System (INIS)

    Essig, T.H.

    1995-01-01

    This talk summary addresses the issue of how future policies of the NRC will affect nuclear power in areas such as construction, emergency preparedness, and licensing. Specific topics covered include the following: Emergent EP licensing issues for operating nuclear Power Plants; 10CFR Part 52 and the process for licensing of Advanced Light Water Reactors (ALWRs); and potential revisions to emergency preparedness programs for future nuclear power plants

  19. Effective Continuing Education for Licensed Real Estate Professionals

    Science.gov (United States)

    Tilton, Wendy A.

    2004-01-01

    Mandatory real estate education has been intensely debated for many years. New Jersey is the only state in the nation that does not require licensed real estate agents to attend an ongoing educational event after securing a license to practice. A bill was proposed to the legislature to mandate real estate education in June of 2001. (It was…

  20. Soft Where? Licensing Struggles in a Virtual World

    Science.gov (United States)

    Ramaswami, Rama

    2011-01-01

    As virtualization becomes commonplace in higher education, it is clear that the traditional licensing options for software are woefully inadequate. The definitions of who is licensed to use what--and where--are blurring, as users move from physical to virtual spaces and can access software from a variety of devices. In discussing the need for new…