A historical review on insulated cables for power transmission, is presented, beginning with impregnated paper insulation, oil filled cables and natural rubber cables. High density and chemically reticulated polyethylene were then used for high voltage and very high voltage cables; the advantages of polyethylene compared to impregnated paper cables are discussed, which led to research programs at EDF on various themes concerning the optimization of polyethylene cables: dielectric properties and reliability, thermomechanical behaviour, thermal ageing of materials, testing methods (acceptance dielectric test and long duration temperature test); utilization of low- and high-density and chemically reticulated polyethylene for 225 kV cables is discussed
This report describes the successful development of a computer program for the analysis of the economic, thermal, and rating characteristics of HPOF underground transmission cables with forced cooling. With this programcable engineers can interactively analyze self-cooled and forced-cooled HPOF cable design alternatives. The program computes cable thermal characteristics and discounted costs so that the impacts of changes in design parameters can be estimated. This report provides a review of the currently available HPOF design options that can be considered. The HPOF economic analysis program is written in FORTRAN IV and was developed for interactive operation.
Severe collapse wrinkles and circumferential creases were discovered in the cellulose paper insulating tapes of a newly installed IIPFF pipe-type cable during splicing and terminating. An evaluation program was developed to assess the electrical and mechanical integrity of the cable having wrinkled and creased insulating tapes. The test results indicated that the cable would perform satisfactorily in service.
Four HVDC (high voltage DC) {+-} 250kV submarine OF (oil-filled) cables are to be installed each capable of 1.4-million kW for one dipole channel and two returns for forwarding to Yura Switchyard a part of the power to be generated by a Tachibanawan coal-fired power plant to open in 2000. The first cable is now being laid. They are to cover a distance of 48km on the sea bottom, and their 190mm diameter is the largest in the world and this decreases the required number of cables for a reduction in the construction cost. The installation is executed by use of a dedicated cable laying ship loaded with cables. The ship is equipped with five thruster screws by adjusting which a cable is fed into the sea and laid on the bottom with high positional accuracy in all directions, and with a 10m-accurate DPS (Dynamic Positioning System) besides GPS ...
This paper describes the dielectric and accelerated aging tests on prototype {plus minus}500 kV dc oil-filled self-contained cables. The extensive test program was required to evaluate the High-Voltage cables for the St. Lawrence river crossing of the {plus minus}500 kV Quebec-New England HVDC power transmission system. The paper relates the main elements of the test program. It describes the required insulation levels, the characteristics of the cables supplied by three different manufacturers, as well as the cables' installation for the type tests and accelerated aging tests. Details of the test program and procedures followed to carry out the tests are given. Findings of the tests are also reported.
The design of High-Voltage, Direct-Current transmission cables insulated with oil-impregnated cellulose paper is constrained by the maximum temperature and the maximum steady-state and transient stresses (voltage gradients) that the cable insulation can reliably withstand over the desired operating lifetime. Because the electrical stresses in the insulation are related in a very complex fashion to temperature, applied voltage and cable geometry, iterative techniques are required to compute the values of these stresses. Digital computers are ideally suited for these iterative techniques. This paper presents the principal equations and logic needed to develop suitable computer programs.
After the successful completion of the development program of the 2000 m water depth HVDC Hawaii Deep Water Self Contained Fluid Filled Cable, the interconnection between Hawaii island and Oahu island is examined. Thermal, electrical, mechanical, hydraulic, corrosion, length aspects are developed for both fluid filled and paper impregnated (SOLID) cables which are foreseen in different portions of the approximately 250 km length connection. Considerations are also presented for the requirements of the cable ship: 12 m sheave diameter, 7000 t capacity for the rotating platform. The feasibility of manufacturing, transporting and laying such cables within a practical schedule is discussed in this paper.
This report summarizes the results of an experimental program which developed a needed reliable data base on modern pipe-type cable construction from which designers can knowledgeably consider maximizing cable pulling lengths with resulting cost savings. The program comprised evaluations of available commercial constructions over the range of conductor sizes (both copper and aluminum) and insulation thicknesses in general utilization. The work focussed on determining the cable's performance under the three mechanical stress modes to which the cable is subjected during installation; (a) tension and elongation, (b) torsion and (c) sidewall (bearing) pressure in bends. Additionally, the program included experimentation to determine the effective coefficient of friction of the various combinations of modern skid wire materials and pipe ...
Summarizing the three main reasons why customized programs are commissioned, this book explains and explores the key aspects of successful development programs, with views from corporate sponsors, participants, faculty contributors and case studies of customised programs commissioned by 6 organizations
A multi-faceted research program has been performed to investigate in detail several aspects of free and forced convective cooling of underground electric cable systems. There were two main areas of investigation. The first one reported in this volume dealt with the fluid dynamic and thermal aspects of various components of the cable system. In particular, friction factors for laminar flow in the cable pipes with various configurations were determined using a finite element technique; the temperature distributions and heat transfer in splices were examined using a combined analytical numerical technique; the pressure drop and heat transfer characteristics of cable pipes in the transitional and turbulent flow regime were determined experimentally in a model study; and full-scale model experimental work was carried out to determine the fluid dynamic and thermal characteristics of ...
SUMMARYTestosterone and estrogen are essential for male behaviors in vertebrates. How these two signaling pathways interact to control masculinization of the brain and behavior...Full Text Available
A multi-faceted research program has been performed to investigate in detail several aspects of free and forced convective cooling of underground electric cable systems. There were two main areas of investigation. The first one, reported in Volume 1, dealt with the fluid dynamic and thermal aspects of various components of the cable system. In particular, friction factors for laminar flow in the cable pipes with various configurations were determined using a finite element technique; the temperature distributions and heat transfer in splices were examined using a combined analytical numerical technique; the pressure drop and heat transfer characteristics of cable pipes in the transitional and turbulent flow regime were determined experimentally in a model study; and full-scale model experimental work was carried out to determine the fluid dynamic and thermal characteristics of ...
One year of research on validating the performance of the Cable Monitoring and Rating System (CMARS) is reported. The performance testing was conducted on underground 230-kV and 345-kV pipe type cable circuits owned by the New Jersey Public Service Electric and Gas Co. Laser temperature monitoring systems and a data acquisition system were installed. Software installation and development is discussed. The CMARS testing program is described. (LCL)
Through a comprehensive and aggressive research program Consolidated Edison Company of New York, Inc. (Con Edison) has designed, developed, and installed several new products to address the environmental impact of dielectric fluid from pipe-type cable systems. These include: On Line Leak Detection, Leak Location, Retractable Flow Direction Indicator, Full Stop Joints, and Transition Joints. This paper describes the application of the aforementioned products on the Con Edison underground transmission system.
This volume is a summary of the results of the final report of the Energy Engineering Analysis Program (EEAP) Study of 30 selected dining facilities at Fort Campbell, Kentucky.
This is a build-and-scrap-and-build job, in which a new No. 1 generator is constructed while the existing plant stays in operation in the same site. Since interference between the new and the existing systems are unavoidable in such work, protection is sufficiently provided and measurements are frequently performed when the work comes to involve important structures positioned close to each other, such as the existing No. 1 and No. 2 OF (oil-filled) cables transmitting power from the existing power plant to Minami-Yokohama Substation of Tokyo Electric Power Co., Ltd., and the newly planned discharge channel or the existing covered sewerage and the newly planned discharge outlet. Now that the newly planned discharge channel intercepts the OF cables at three places and is installed to pass under the existing cable duct, it once happened that the duct supporting piles were severed for the cables to suspend ...
A thermal model is formulated for the determination of the emergency transient ampacities of a three phase, horizontally spaced underground cable system. The model is based on a finite difference heat transfer analysis and the principle of superposition which permits the summation of the temperature rise of individual heat sources to eventually provide for the temperature rise of a multiple cable system. The thermal model is transformed into a complex computer program that is capable of calculating the real time cable temperature for any change in conductor current. The program is used to calculate the response of conductor temperatures caused by both ramp and step changes in currents for four conductor sizes between 4/0 and 1500 kcmil. The amount of time to reach conductor temperatures of 100/sup 0/C and 120/sup 0/C from a steady conductor temperature of 75/sup 0/C is calculated ...
This report presents a reassessment of the design of Resistive Cryogenic Cable Systems with regard to dielectric material selection, thermal insulation selection, conductor design, and refrigeration subsystem design. An algorithm using test data generated as part of the program and available from the literature was developed and used to assess the driving parameters for system cost analysis. The results of this cost sensitivity analysis are presented. An electric utility, Public Service Electric and Gas of New Jersey (PSE and G), performed an economic viability evaluation comparing two selected Resistive Cryogenic Cable Systems to a conventional cable system (high pressure oil-filled). The comparison was made for a 35-mile network application on the PSE and G transmission system scheduled to be placed in service in 1995. Consideration was given to equipment capital, installation, and operating costs. It ...
The current-carrying capacity of oil-filled cables is increased by forced cooling, which is accomplished by three methods: direct, surface and internal, depending on the relative positions of the cable and the cooling agent. The surface and indirect methods are the simplest and are sufficiently effective methods of cooling and make it possible to improve the current-carrying capacity of cables already mastered by the USSR's industry. A calculation method is suggested for the proper determination of the permissible load on lines of these sorts. A procedure is presented whereby equations are derived which make it possible to calculate the temperature of elements of the system and by means of an iteration calculation a determination is made of the total heat flow from the cable with which the temperature of the conductor along the line does not exceed the permissible value. The permissible current ...
The purpose of this analysis is to develop a systematic program of projects that will result in energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan for the Stratford Army Engine Plant in Stratford, Connecticut. Reduced energy consumption is a stated goal for the Army Facility Energy Plan.
A dipole magnet based on the common coil design, using prereacted Nb{sub 3}Sn superconductor, is under development at Fermilab, for a future Very Large Hadron Collider. This magnet has some innovative design and technological features such as single layer coils, a 22 mm wide 60-strand Rutherford type cable and stainless steel collars reinforced by horizontal bridges inserted between coil blocks. Both left and right coils are wound simultaneously into the collar structure and then impregnated with epoxy. In order to optimize the design and fabrication techniques an R&D program is underway. The production of cables with the required characteristics was shown possible. Collar laminations were produced, assembled and tested in order to check the effectiveness of the bridges and the validity of the mechanical design. A mechanical model consisting of a 165 mm long section of the magnet straight section was assembled and ...
This handbook provides the necessary tools for the engineer to design forced-cooled HPOF pipe-type cable systems. It represents the final objective of a major project which included an extensive research program at the Waltz Mill Forced-Cooling Test Facility. The formulas and procedures presented in this handbook are consistent with the results of this program as well as other full-scale and model investigations. Introductory material, including historical information, general design concepts and basic heat transfer and fluid dynamics theory is given for those who are unfamiliar with the fundamental principles of forced-cooling. The nucleus of the handbook consists of equations and calculating procedures for determining forced-cooled parameters and thermal/hydraulic performance levels. Both simple and sophisticated procedures have been provided, with the more complex procedures treating such areas as the thermal interaction ...
Separate abstracts were prepared for 20 papers in this conference report and includes all papers in the ''engineering'' section (program E). Ocean thermal energy conversion (OTEC), moorings, cables, corrosion protection, corrosion testing, coatings, offshore platforms, pipelines, OTEC models and pilot plants, and energy transfer are topics discussed.
Scour around offshore structures is well known. It is caused by the strong eddy formation at the base of the structures protruding from the sea bottom. The strong vortices result in an amplified effective shear stress working on the sea bottom surface adjacent to the structure. When the surrounding sea bottom is lowered the scour protection will end up being a cap on a small hill and when the slopes are getting too steep the scour protection will roll or slide down the sides. It will loose its cohesion and therefore its integrity. This will take place irrespective of the type of scour protection material and the type of scour protection. This report describes scour protections, which can deal with this particular problem. Such a scour protection must be able to sustain the following loads: Be able to follow the lowering of the seabed on its way down; Be resistant to edge scour (scour around the perimeter of the scour protection). The installation of scour protection is not ...
This summary denotes the progress made by the Exploratory Technology Research (ETR) Program for Electrochemical Energy Storage during calendar year 1992. The primary objective of the ETR Program, which is sponsored by the US Department of Energy (DOE) and managed by Lawrence Berkeley Laboratory (LBL), is to identify electrochemical technologies that can satisfy stringent performance, durability and economic requirements for electric vehicles (EVs). The ultimate goal is to transfer the most-promising electrochemical technologies to the private sector or to another DOE program (e.g., SNL`s Electric Vehicle Advanced Battery Systems Development Program, EVABS) for further development and scale-up. Besides LBL, which has overall responsibility for the ETR Program, LANL and BNL have participated in the ETR Program by providing key research support in several of the ...
The Hazardous Material Management and Emergency Response Training and Education Center -- known simply as HAMMER -- is being developed to assist the US Department of Energy (DOE) and others dedicated to improving worker health, safety and productivity. HAMMER is a training and education program for hazardous material, waste management, and emergency response workers. HAMMER is managed by the DOE Richland Operations Office under Work Breakdown Structure (8.2). The 1996 Multi-Year Program Plan (MYPP) includes the Execution Year data and provides the information for Programmatic Fiscal Year Site Management System Execution Baseline, as well as the detailed work plan for performance evaluation of the authorized work. The MYPP incorporates various planning methodologies to define the program and provides essential program integration, and a fully developed technical, ...
In this paper we describe a modelling project to improve a nuclear waste management program in charge of the creation of a new system for the permanent disposal of nuclear waste. SADT (Structural Analysis and Design Technique) is used in order to provide a work-flow description of the functions to be performed by the waste management program. This description is then translated into a number of Coloured Petri Nets (CPN or CP-nets) corresponding to different program functions where additional behavioural inscriptions provide basis for simulation. Each of these CP-nets is simulated to produce timed event charts that are useful for understanding the behaviour of the program functions under different scenarios. Then all the CPN models are linked together to form a single stand-alone application that is useful for validating the interaction and cooperation between the different program ...
The Site Environmental Report is an integrated report on Berkeley Lab's environmental programs to satisfy the requirements of DOE Order 231.1A, Environment, Safety, and Health Reporting. It summarizes Berkeley Lab's environmental management performance, presents environmental monitoring results, and describes significant programs for calendar year 2007. Volume I is organized into an executive summary followed by six chapters that contain an overview of the Laboratory, a discussion of the Laboratory's environmental management system, the status of environmental programs, and summarized results from surveillance and monitoring activities.
In this book an attempt has been made to describe the most recent information, but at the same time set out the fundamentals of cable technology in some depth. A focus is directed on general features of various kinds of cables. This book is written for cable engineers, and those interested in cable research, the book will also be useful to university students and management personnel interested in electric power engineering. This volume contains chapters on Present Cables and Their Improvement and New Types of Cables. (CS)
It needs accurate estimation of radiation level for verifying machinery and cable in Nuclear Power Plant. Therefore, in this study, we used ESR(Electron Spin Resonance) system for estimate dose of Alanine dosimeter. Alanine/ESR dosimetry, already known as a dosimetric method in medical and industrial field, was applied to estimate dose quantity at cable locations within a nuclear power plant as a part of equipment qualification program. Alanine/ESR dosimetry of absorbed dose range is 1 - 100 KGy. The alanine dosimeter is not significantly affected by temperature and fading is limited to 1% per year. The alanine dosimeters were fixed on the targeted cable or nearest position to measure dose quantity to get accurate value. Alanine dosimeters were scanned by commercially used two different ESR systems, e-scan and EMX series for alanine dosimeters. To estimate more accurate dose, two environmental ...
One of the major achievements of the magnet R&D program for the Superconducting Super Collider (SSC) is the fabrication and test of a series of 20 5-cm aperture, 15-m long dipole magnet prototypes. The ramp rate sensitivity of these magnets appears to fall in at least two categories that can be correlated to the manufacturer and production batch of the strands used for the inner-coil cables. The first category, referred to as type-A, is characterized by a strong quench current degradation at high ramp rates, usually accompanied by large distortions of the multipole fields and large energy losses. The second category, referred to as type-B, is characterized by a sudden drop of quench current at low ramp rates, followed by a much milder degradation at larger rates. The multipole fields of the type-B magnets show little ramp-rate sensitivity, and the energy losses are smaller than for the type-A magnets. The behavior of the Type-A magnets can ...
This document describes the proposed strategy for disposal of spent and failed melters from the tank waste treatment plant to be built by the Office of River Protection at the Hanford site in Washington. It describes program management activities, disposal and transportation systems, leachate management, permitting, and safety authorization basis approvals needed to execute the strategy.
In addition to an executive summary and glossary, the following sections are included: Clean Boiler Fuel Demonstration Plant; Development of Coal Feeders for Coal Gasification Operations; Development of a Continuous Dry Coal Screw Feeder; Coal Feeder Development Program; Engineering and Technical Support; Technical Assistance Services; and Conceptual Design for an Advanced Coal Liquefaction Commercial Plant. (EJH)
In addition to an executive summary and glossary, the following sections are included: Clean Boiler Fuel Demonstration Plant; Development of Coal Feeders for Coal Gasification Operations; Development of a Continuous Dry Coal Screw Feeder; Coal Feeder Development Program; Engineering and Technical Support; and Technical Assistance Services. (EJH)
The Office of Civilian Radioactive Waste Management (OCRWM) is executing a plan for improvement of the United States Nuclear Waste Management Program. As part of the plan, OCRWM is performing a systems engineering analysis of both the physical system, i.e., the Nuclear Waste Management System (NWMS), and the programmatic functions that must be accomplished to bring the physical system into being. The functional analysis effort is being performed by two separate teams working in parallel, one of which addresses the physical system functions and the other the programmatic functions. This paper presents information on the analysis of the programmatic functions.
Contract No. DACA 90-8l-C-oo72 directs that a basewide energy study be accomplished for the Mannheim and Pirmasens Military Communities, Federal Republic of Germany. The project is identified as Energy Engineering Analysis Program (EEAP) Package No. 5. The overall objective of the study is to produce a systematic plan of improvement projects that will reduce by 1985 the energy consumption in compliance with the Army Facilities Energy Plan without decreasing the readiness posture of the Army.
The technical development of electric cables in the history of the Berlin electric utilities looks back on more than one century of continuous progress from jute-insulated direct-voltage cables, to 30 kV paper-insulated mass-impregnated cables, 110 kV plastic-insulated cables, 380 kV oil-filled cables, and 380 kV XLPE cables which are increasingly used today. A brief review informs about the major stages of power cable development. (orig.).
The Transuranic Waste Form Characterization and Data Base (Volume 1) provides a wide range of information from which a comprehensive data base can be established and from which standards and criteria can be developed for the present NRC waste management program. Supplementary information on each of the areas discussed in Volume 1 is presented in Appendices A through K (Volumes 2 and 3). The structure of the study (Volume 1) is outlined and appendices of Volumes 2 and 3 correlate with each main section of the report. The Executive Summary reviews the sources, quantities, characteristics and treatment of transuranic wastes in the United States. Due to the variety of potential treatment processes for transuranic wastes, the end products for long-term storage may have corresponding variations in quantities and characteristics.
This is the seventh report by the Advisory Committee on Reactor Safeguards (ACRS) in response to the Congressional requirement for an annual report on the Nuclear Regulatory Commission (NRC) Reactor Safety Research Program. As previously requested by the Congress, the timing of this report has been adjusted to enable the ACRS to address the proposed budget for FY 1985 that has been submitted to the Congress by the President. Part I is a compilation of our comments and recommendations regarding the NRC Safety Research Program budget for FY 1985. It is intended to serve as an Executive Summary. Part II is divided into eight chapters, each of which represents a Decision Unit of the NRC research program. In each chapter, specific comments are included on the research involved in the Decision Unit, an assessment of priorities, and recommendations regarding new directions and levels of funding.
This is the sixth report by the Advisory Committee on Reactor Safeguards (ACRS) that has been prepared in response to the Congressional requirement for an annual report on the Nuclear Regulatory Commission (NRC) Reactor Safety Research Program. Part I is a compilation of our general comments and recommendations regarding the NRC Safety Research Program, and includes budget recommendations and an identification of matters of special importance that deserve increased emphasis. It is intended to serve as an Executive Summary. Part II is divided into ten chapters, each of which represents a Decision Unit of the NRC research program. In each chapter, specific comments are included on the research involved in the Decision Unit, an assessment of priorities, and recommendations regarding new directions and levels of funding.
The direct-current submarine cable interconnecting Hokkaido and Honshu (hereafter called HH linkage) is an example of installation of an undersea cable for long-distance power transmission crossing a sea strait. In particular, the feature of this interconnection is that an oil-filled (OF) cable is used for the high-voltage side with crosslinked polyethylene (XPLE) cable adopted for the return to comprise a conductor return system. The details of the facilities, especially the design of the OF submarine cable are described. 3 refs.
The US Department of Energy, Division of Electric Energy Systems, has undertaken to identify the environmental issues and potential impacts associated with the installation of underground electric power transmission systems. This study reports the results of investigations into the advanced cable technologies being considered for future underground applications, as part of the development oriented research program of the Division of Electric Energy Systems. While the technology involves a high level of sophistication, there are relatively few impacts to the environment that are potentially significant, and of these none are inherently non-mitigable. Route planning, system design, and methods of construction and accident response can be pursued in order to minimize impacts where strict constraints are appropriate.
Improvements in electric submersible pumping systems have resulted in a demonstrated downhole running life of one year for low horsepower units operating in 180 C brine. The implementation of a prototype pressurized lubrication system to prevent brine intrusion and loss of lubricating oil from the motor and protector sections has been successfully tested. Second generation pressurized lubrication systems have been designed and fabricated and will be utilized in downhole production pumping tests during FY84. Pumping system lifetime is currently limited by available power cable designs that are degraded by high-temperature brine. A prototype metal-sheathed power cable has been designed and fabricated and is currently undergoing destructive and nondestructive laboratory testing. This cable design has the potential for eliminating brine intrusion into the power delivery system through the use of a hermatically sealed ...
Objective:To determine the pattern of executive dysfunction in frontotemporal dementia (FTD) and corticobasal syndrome (CBS) and to determine the brain areas associated with executive...Full Text Available
This paper reported on a study in which partial discharge (PD) measurements were performed on 6 underground transmission cable circuits to determine the effectiveness of PD measurements on fluid fill cables. The cables were between 37 and 56 years old. PD activity was detected from the terminations of H11L and H3L Cable 2. However, for cables from H3L Basin TS to Mill Street junction, PD activity was detected originating from within the main cable insulation.
A chromatographic technique is described for checking the condition of cable insulation by analyzing cable oil for the gases that are typical of defects in power transformers: carbon dioxide, acetylene, methane and ethylene. This technique was successfully used for predicting breakdown of insulation on KL-2 cable at one of the hydroelectric plants of Kirgizglavenergo power grid 1.5 months in advance. The presence of the above-mentioned gases in cable oil can provide a signal for monitoring the state of cable insulation. Further research is needed in addition to more operational experience to work out criteria for objective evaluation of the state of cable lines.
The entire Electric Power Research Institute (EPRI) cofiring program has been in existence of some 9 years. This report presents a summary of the major elements of that program, focusing upon the following questions: (1) In pursuit of increased use of renewable energy in the US economy, why was electricity generation considered the most promising target, and why was cofiring pursued as the most effective near-term technology to use in broadening the use of biomass within the electricity generating arena? (2) What were the unique accomplishments of EPRI before the development of the Cooperative Agreement, which made developing the partnership with EPRI a highly cost-effective approach for USDOE? (3) What were the key accomplishments of the Cooperative Agreement in the development and execution of test and demonstration programs-accomplishments which significantly furthered the process of commercializing ...
This is the eighth report by the Advisory Committee on Reactor Safeguards (ACRS) that has been prepared in response to the Congressional requirement for an annual report on the Nuclear Regulatory Commission (NRC) Reactor Safety Research Program. As previously requested by the Congress, the timing of this report has been adjusted to enable the ACRS to address the proposed budget for FY 1986 and 1987 that has been submitted to the Congress by the President. Detailed comments and recommendations are provided for the research programs and budget proposed for FY 1986. Because both the budget for FY 1987 and the research programs for that period are highly uncertain at this time, comments on these are not provided. Part I is a compilation of general comments and recommendations regarding the NRC Safety Research Program budget for FY 1986. It is intended to serve as the Executive Summary. ...
This paper describes the development of cellulose paper/plastic film/cellulose paper laminate insulated Self-Contained 500 kV Oil-Filled (OF) Cable and its accessories. Dielectric loss of this new cable was confirmed to be about one third that of conventional kraft paper cable. Moreover, by employing the reduced insulation thickness of 25 mm rather than that of 33 mm, as is usual with conventional cables, the new cable could be made very compact, due to the high dielectric strengths of laminated paper. As a result, the shipping reel length of the new cable, which is about 10% lighter in total weight and 10% smaller in overall diameter than conventional cables, could be dramatically increased. The reliability and the stability of the new cable have been demonstrated by the successful completion of a one and a half year ...
The invention deals with a pumping plant for oil filled power cables. An air driven piston type pump is used as primary pump. A PLS (Programmable Logic control System) is used to control the oil flow to the cable(s). Improvements of the pump includes means for ensuring that the pump piston is operated also at low pressure and flow, and means for sealing off the piston rod to ensure maximum life of seals, to facilitate detection of possible leakages and to avoid contamination of the cable oil. 3 figs.
The use of oil-filled high-pressure electric cables has increased significantly. In recent years, the electric cable industry has developed new designs, manufacturing technology, and has mastered the production of 110 to 220 kV cables without using a temporary lead sheath. The design, fabrication, and performance of high-pressure electric cables for power systems are discussed.
This report presents the record of the workshop Water Treeing and Aging.'' The workshop was held in Phoenix, Arizona on December 9--11, 1990 and was sponsored by the Distribution Program of the Electrical Systems Division of the Electric Power Research Institute (EPRI). Attendance at the workshop was by invitation only. Twenty two attendees from seven countries, from universities, research organizations, electric utilities and polymeric materials suppliers took part in this workshop. The workshop was designed to assess progress in the understanding of water treeing phenomena and polymeric cable insulation aging since the last meeting of a similar forum of experts, which was organized by the Office of Exploratory Research of EPRI in December 1985. The objective of the present workshop was to assess progress and to provide direction for further studies in this field. The discussions covered a wide range of subjects including ...
The Zaafarana oilfield development, operated by Zaafarana Oil Co. (Zafco) presented a series of unique challenges, including redeployment of an internal-turret mooring system, use of a turret-based electrical-cable jumper system, and permanent use of cable-deployed electric submersible pumps in the gravel-pack well completions. Following a detailed three-dimensional (3D) seismic program, the field was discovered by the first well in December 1990. Four subsequent appraisal wells were drilled. The discovery well and two of the appraisal wells tested oil at rates ranging from 2,000 to 10,100 B/D. Initial development plans called for the use of two conventional platforms with a pipeline to a shore-based treatment and storage terminal. Data acquired from subsequent wells were incorporated into the mapping and reserve estimates resulting in a sharp downgrade of the estimated recoverable reserves. The reduced estimate, combined ...
A conceptual design of a solar retrofit to US Gypsum's plant at Sweetwater, Texas, has been developed which provides heated air to a large gypsum board drying kiln that is currently under construction. The solar heated air displaces natural gas normally used for the process heat. The solar retrofit is composed of a tower focus collector with a cavity receiver which uses air as the heat transfer fluid. An executive summary of the conceptual design, system performance, economics, and development plan is presented. (WHK)
This paper reports progress in the fabrication and characterization of an array of 1nm-scale colloidal particles (i.e., quantum-dot array) that can be operated to execute nontrivial and innovative computations, possibly including quantum logic. We discuss the actual fabrication of 2-nm metal clusters as an example of possible quantum dot implementation. Innovative and unconventional paradigms underlie the different stages of this work. For example, regular array geometry is achieved by directing appropriately derivatized metal clusters to preselected locations along a stretched strand of an engineered DNA sequence.
Knowledge of ground subsidence behavior provides for better economic planning and execution of a mining exploitation, higher safety and optimum use of the resources without ruining the environment. In addition, when considering subsidence generated by petroleum exploitation, the monitored (measured) subsidence, combined with geological information and a suitable prediction model, can provide data on the expanse of the oil field and thus aid in the estimation of available resources. An integrated survey system for monitoring mining subsidence is described which has been developed as part of a research program in cooperation with the Canada Centre for Mineral and Energy Technology. (JMT)
This compilation contains 47 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1996. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room, the U.S. Library of Congress, and the Internet at http://www.nrc.gov/ACRSACNW. The reports are divided into two groups: Part 1 contains ACRS reports by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft ProgramExecution Plan (''ProgramExecution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited ...
An anomaly in the continuous X-ray (CXR) response of filled cables is described. A systematic investigation of this anomaly is pursued with a single cable type and a model explaining the anomaly is presented. The effect of the anomaly on the accuracy of CXR measurement of SGEMP response is discussed.
Following an earlier article on developments to enhance the reliability of supertension oil filled cables and accessories, changes are described in design and installation of complete cable systems which have similarly improved operating performance.
In marine seismic exploration, an approximately two-mile long hydrophone cable is towed behind the ship. The commonly employed cable consists of a kerosene-filled hose enclosing hydrophones, electrical wires, and steel ropes. The kerosene provides buoyancy while the steel ropes are for structural support. For deep-water operations, the cable is pulled through the water at a depth of 20-40 feet. For shallow water, a bottom reference configuration is used and the cable is dragged. This paper presents a comparison of electroacoustic properties between a newly designed, buoyant solid cable and those of the conventional kerosene-filled hose. The emphasis is on drag cable operations. Cable maintenance is a major problem. Jacket cuts occur because of improper handling or collisions with other ships, subsea structures, and debris. Kerosene leakage ...
This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description ...
Characteristics of embedded systems are discussed. In particular, the role of the computer in such systems is highlighted. Special emphasis is placed on the different requirements different kinds of systems may place on programexecution. From such requirements necessary programming constructs are derived and in an overview of currently used languages it is shown how evolution led to modern languages like Ada and CHILL. With the advent of cheap, fast and small processing units, exploitation of parallelism for enhancing system performance is becoming increasingly tempting. However, few languages support the design of such multi-processor systems. Some methods for dealing with this problem are discussed. Finally, systems architectures and associated languages for the use of techniques originally developed for AI research are adumbrated. (Auth.).
HAMILTON is a computer code performing all algebraic operations necessary for an analytic determination of the power series of the Hamiltonian equations of motion in the electromagnetic fields with at least one plane of symmetry. It is written entirely in FORTRAN in order to achieve fast machine performance, a requirement which is essential due to the complexity of the equations of motion in higher orders. HAMILTON is considerably faster than common more versatile formula manipulators and uses noticeably less storage. Besides the mere solution of the equations of motion, HAMILTON also produces FORTRAN code compatible with the program COSY 5.0 allowing the computation of matrix elements of individual optical elements and their concatenation. The produced FORTRAN code is highly optimized and on average requires only 30% of the execution time of a handwritten comparable code. (orig.).
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan ...
The United States Air Forces air mobility command is responsible for creating a schedule and executing that schedule for a large-scale air mobility network that encompasses aircraft with prioritized missions. Aerial ports (airports) can process or park a maximum number of aircraft, called the maximum on ground (MOG). As the schedule changes due to disruptions, such as equipment failure or weather, the MOG constraint can cause the new schedule to be infeasible. Traditionally, re-planning the channel route schedule to adhere to MOG constraints has been a manual process that usually stops after the first feasible set of changes is found, due to the challenges of large amounts of data and urgency for a re-plan. We extend Bertsimas and Stocks integer program formulation for the commercial airli...
The unique time scales associated with nuclear waste management require active work to preserve the knowledge associated with programs that can often span long time frames. For example, repository programs are designed and developed for the safe containment of radionuclides with half-lives on the order of 24,000 years (for Pu-239). Performance assessment studies are required to show, by predictive modeling, that these repositories can safely contain the waste for tens of thousands of years, with one million years a reality in the debate. Development of successful repository programs can span several decades. Once operational, a repository is expected to function until closure for a period of 30 to 40 years. Yet, the decision makers at all levels in such a repository program exert influence and authority over much shorter periods of time (e.g., four years for executive appointments). ...
There is an urgent need to monitor the condition of fluid-filled taped (FFT) cables. The Dissolved-Gas Analysis (DGA) technique that has been successfully applied to power transformers holds great potential for the preventive maintenance of FFT cables. However, before this emerging technique can be properly applied to cables, a suitable fluid sampling and subsequent gas analysis method had to be developed, including the generation of both laboratory and field data to aid in data interpretation. Data on gas saturation levels in various cable fluids have been presented. This paper describes a novel method developed specifically for FFT cables and discusses field results so obtained. The type, distribution and concentration of gases from fluid alone and paper alone under electrical stress has been presented, including the differences between normal and not-so-normal ...
An explanation is given of life estimation of CV cable and OF cable which are generally used as high-voltage power cable. CV cable uses XLPE (crosslined polyethylene) and OF cable uses oil-immersed paper as electrical insulators. Relating to CV cable, voltage deterioration due to partial discharge and electric treeing occurs in a high electric field, and by extrapolating the data of up to the actually used electric field in this high electric field, the life is estimate (there is an n-power deterioration law which is V{sup n} = t between breakdown voltage V and electric applied time t). Validity of this extrapolation, however, is a future issue. Further, in the use under the immersion condition, water tree deterioration phenomena influenced by water content and the electric field which are characteristic of CV cable are seen even in the ...
Aging degradation is a phenomenon we all experience throughout life, both on a personal basis and in business. Many industries have been successful in postponing the inevitable impact on their related systems and components through programs to maintain long-term reliability, maintainability and safety. However, this has not always been the case for nuclear power. While all power plants are experiencing the world trend of increasing operating costs with age, few (if any) have been able to fully define the parameters that solve the aging equation, particularly in relation to major components. Inspection and preventive maintenance have not been effective in predicting life-limiting degradation and failure. In CANDU nuclear plants, utilities are taking a comprehensive approach in dealing with the aging problem. Programs have been established to identify the current condition and degradation mechanisms of critical components, the failure of which ...
Fabrication of diffused titanium optical guides on a LiNbO/sub 3/ crystal substrate requires precise quality assurance. Light couplers in particular must be positioned within micron specifications. This requirement is the reason that the width of lines detected during microscopic inspection of the crystal is such an important parameter for quality evaluation. To assist in the inspection of these optical guides, a line width estimation program has been developed for an IBM PC based microscope inspection system. A digital image processing approach is used to develop an algorithm which can be tailored by the user for specific signal and noise characteristics. Default filter parameters, which can be updated and saved interactively by the user, are stored in a file on disk. The final program can be executed stand-alone or through a commercially available, menu-driven, image processing software package. Details concerning the ...
In the execution of disposal of low and intermediate level radioactive wastes, it is important to evaluate accurately the kind and quantity of each radionuclide in the wastes. For such an evaluation, correlation of non-gamma-emitting nuclides based on gamma-emitting nuclides is recommended and regarded as a partial method. This method necessitates a completion of a highly accurate and reliable nondestructive assay system of gamma-emitting nuclides for partical use. In 1992, in support of the new waste disposal program in Hungary, Paks NPP initiated a waste characterization program to determine the radiological properties of its rad wastes. A segmented gamma scanning system has been set up to measure the gamma-emitting nuclides in 2000 litre low level drums following in-drum compaction. In the framework of the program a radiochemical analysis sub-program was stated to determine the ...
Recent developments in cross-linked polyethylene cables mean they can be used at higher voltages and are starting to replace some oil-filled cables. Their good thermal and electrical properties, easy installation and minimal maintenance have helped their growth. A group at Sumitomo Electric Industries Ltd., Japan is studying the performance of these cables. (author).
Two accelerated aging test procedures are proposed for use on solid dielectric extruded distribution cables under wet conditions. One test method is a fixed time duration test in which the degree of cable specimen aging is assessed in terms of breakdown tests, while the other test method is a time to breakdown test in which the cable specimens are voltage stressed until failure ensues.
Application, design, and installation of the cable line in steel pipe with oil under pressure for 500 kV is considered. The cable construction and design specifications are presented. Manpower requirements for the installation of the cable, extending from the hydrogenerators to the outdoor switchgears or to the change point where they are connected to overhead power lines, are discussed and data provided.
The paper-insulated low-pressure oil-filled cable invented in 1917 has been used throughout the world as the major cable system for voltages from 33kV to 525kV and experimentally to 1100kV. The proven reliability of the design is amply demonstrated by the cables installed in the early 1930s still currently in service. The inherent design of an oil-filled cable requires that the low viscosity oil is retained within a lead or aluminium sheath. Changes in oil volume due to changes in ambient temperature and load are accommodated by oil reservoirs which maintain the cable oil pressure within design limits. A microprocessor monitoring system that allows early detection and quick location of oil leaks from high voltage oil-filled cables is described.
The author explains current developments in high voltage cable technology and subsequently describes problems inherent in its application, from the users viewpoint, in municipal electricity supply. The planning of a high voltage cable network and the selection of a specific type of cable are not only dependent on the typical properties of various cables but to a major degree also on the feasible laying technique, the power transmitted, the costs, the stellation treatment of the high voltage network, the acceptance requirement, the inductive influence from telecommunication cable, thermal influences from the environment, eventual safeguards from mechanical and chemical damage to the network, frequency of failure and surveillance and breakdown location. In conclusion, the author portrays potential developments in the fields of high and maximum voltage cable from ...
The method is used for repairing armored logging cables. It consists of preparing armor, subsequent connection of current-conducting strands and wires of the armor, and laying of the armor. Sections of connecting the wires of the armor of the lower and upper layers are scattered over the length of the fused section of the cable. In order to improve the fault strength of the cable, the junctions of connection of the armor wires are scattered among themselves at a distance determined by the Euler formula, and thermal tempering of the wire sections is carried out near these junctions, and then the fused section of the cable is reinforced.
In 1969, the authors started R and D on a polypropylene laminated paper (PPLP) as a new low-loss insulating paper for oil-filled (OF) cables. Through the material research and the trial manufacture of 275 kV OF cable and four years of long-term field test, PPLP has reached the stage of commercial use. This paper introduces a summary of the history of the development of PPLP, the characteristics of PPLP and cable, the results of long-term field test of 275 kV cable, and other relevant data.
Many power apparatus and underground cable systems have been constructed since 1970 in korea. Recently, as the needs for underground T and D systems increase rapidly, any fault on the systems causes enormous economic losses in our society. Thus, this paper described. (1) Survey on the amount and the increasing rates of the underground cable systems at home and abroad. (2) Survey on fault data for the underground cables and joints at home and abroad.From the analysis on fault data, we analyzed the cause of fault and classified the typical fault mode for the underground cable systems. (author). 5 refs., 3 figs., 11 tabs.
The US Department of Energy has provided support to four universities and the Oak Ridge National Laboratory in order to pursue research leading to the development and deployment of an advanced robotic system capable of performing tasks that are hazardous to humans, that generate significant occupational radiation exposure, and/or whose execution times can be reduced if performed by an automated system. The goal is to develop a generation of advanced robotic systems capable of performing surveillance, maintenance, and repair tasks in nuclear facilities and other hazardous environments. This goal will be achieved through a team effort among the Universities of Florida, Michigan, Tennessee, Texas, and the Oak Ridge National Laboratory, and their industrial partners, Combustion Engineering, Martin Marietta Baltimore Aerospace, Odetics, Remotec, and Telerobotics International. Each of the universities and ORNL have ongoing activities and corresponding facilities in ...
The recent developments in the mobile technology (mobile phones, middleware) created a need for new methods of protecting the code transmitted through the network. The proposed mechanisms not only secure the compiled program, but also the data, that can be gathered during its "journey". The oldest and the simplest methods are more concentrated on integrity of the code itself and on the detection of unauthorized manipulation. Other, more advanced proposals protect not only the code but also the execution state and the collected data. The paper is divided into two parts. The first one is mostly devoted to different methods of securing the code and protecting its integrity; starting from watermarking and fingerprinting, up to methods designed specially for mobile agent systems: encrypted function, cryptographic traces, time limited black-box security, chained-MAC protocol, publicly-verifiable chained digital signatures The second part presents new ...
Efforts concentrated on updating of the Rockwell reference concept, definition of new system options, studies of special emphasis topics, further definition of the transportation system, and further program definition. The Rockwell reference satellite concept has a gallium arsenide (GaAs) solar cell array having flat concentrators with an effective concentration ratio of 1.83at end of life. Alternatives to this concept includes solid state power amplifiers or magnetrons for dc/RF conversion and multibandgap solar cells for solar to dc energy conversion. Two solid state concepts were studied. It was determined that the magnetron approach was the lowest mass and cost system.
This report gives a brief introduction to the project `Probabilistic Design Tool for Wind Turbines` - PRODETO - which was carried out during the years 1996-98 with partial funding from the European Commission under the Non-Nuclear Energy Programme JOULE III. The report gives an overview of the objectives and motivation for the project, and the methodology used. In this context, an example of reliability-based wind turbine design against fatigue failure is outlined with emphasis on the various important steps herein, which include probabilistic load and resistance modelling, calculation of failure probability, and calibration of partial safety factors for use with a deterministic design code format. The results of the project are presented with emphasis on a developed computer program and its capabilities, and the various elements of an executed case study are outlined. A list of project reports concludes the report. (au)
This compilation contains 44 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1995. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 50 ACRS reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1992. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part I contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 50 ACRS reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1992. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part I contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 41 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1991. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 41 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission, Executive Director for Operations, or to the Office of Nuclear Regulatory Research, during calendar year 1991. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
This compilation contains 54 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1989. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1 -- ACRS Reports on Project Reviews, and Part 2 -- ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order.
This compilation contains 47 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1988. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1, ACRS Reports on Project Reviews, and Part 2, ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. 136 refs., 1 tab.
This compilation contains 47 ACRS reports submitted to the Commission or to the Executive Director for Operations during calendar year 1987. It also includes a report to the Congress on the NRC Safety Research Program for FY 1988. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order.
This compilation contains 31 Advisory Committee on Reactor Safeguards (ACRS) reports submitted to the Commission or to the Executive Director for Operations during calendar year 1990. It also includes a report to the Congress on the NRC Safety Research Program. All reports have been made available to the public through the NRC Public Document Room and the US Library of Congress. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subject. Part 1 contains ACRS reports alphabetized by project name and by chronological order within project name. Part 2 categorizes the reports by the most appropriate generic subject area and by chronological order within subject area.
The recent attempt to degassify a self contained liquid filled (SCLF) cable in Ontario Hydro is described. In September 1989, there was a high pressure alarm on one phase of a SCLF 115 kV cable circuit. The direct buried cable circuit is about 1,890 m long with two joints and was installed in 1968. Oil samples from the cable had 10 to 12% gas content with high levels of hydrogen, methane, and ethane, and very low levels of carbon monoxide, carbon dioxide, and acetylene. From these results it was concluded that the gas was generated by low energy electrical discharges and the paper insulation was not degraded. Various utilities and cable manufacturers were contacted to find if they had experienced similar problems. The cable duct oil was flushed and gasified and the successive oil samples were analyzed in order to locate the gassing site. The joints were examined ...
Studies were conducted to examine the pressure on fluid-filled cables of electric power transmission networks in the event of an oil leak. Transition splices between paper-insulated oil-impregnated cable systems (PILC) and solid dielectric cable is difficult to perform. A proper PILC is composed of a means to contain oil within the cable structure and to keep moisture out. A failure of the cable joint could occur if an oil leak dries out the paper. Since oil pressure in most PILC cables is high, strong mechanical means must be devised to contain the oil within the cable. Resin systems, heat shrink systems and wiped lead sleeves to reseal the PILC cable over the splice, are among the methods used to stop an oil leak. A system has been designed using an EPDM tube contained under mechanical pressure; it has proven to be ...
The downstream failure of cable during winding, insulating, coil winding, and coil assembly is a significant issue in magnet production. The impact of these failures are costly both financially, and from the time to recover from this downstream failure. The current approach to cabling has been to visually inspect the cable for any gross defects during cabling. To date this has been effective in finding small defects such as crossovers for example, which drastically reduce the mechanical integrity of the strand, and thus the cable itself. But because of the large volume of cable which will be manufactured an automated flaw detection system which can inspect the cable and detect these type of defects will be needed. We have recently done an on-line experiment using an Eddy current system, and specialized Eddy current probes to inspect ...
The downstream failure of cable during winding, insulating, coil winding, and coil assembly is a significant issue in magnet production. The impact of these failures is costly both financially and because of the time needed to recover from them. The current approach to cabling has been to visually inspect the cable for any gross defects during cabling. To date this has been effective in finding small defects such as crossovers, which drastically reduce the mechanical integrity of the strand and thus of the cable itself. But because of the large volume of cable that will be manufactured, an automated flaw detection system that can inspect the cable and detect these types of defects will be needed. We have recently done an on-line experiment using an Eddy current system and specialized Eddy current probes to inspect cable ...
This paper describes the criteria used for the thermal, electrical, mechanical, hydraulical design of the submarine power cables crossing Long Island Sound to feed New York City. The cables are of the self contained fluid filled (SCFF) type. There is also a description of the special measures adopted to face the exceptionally aggressive environment, due to presence of hydrogen sulphide and of stray currents (caused by electric railways and pipes cathodic protection). The most significant example of such measures is a third sacrificial armour. Four single-core SCFF cables (one spare) were manufactured in Arco Felice (near Naples, Italy), for the New York Power Authority. The average length of the cables is 13 km, jontless. The Italian cable ship 'Giulio Verne', managed by Pirelli, was utilized for the transportation and laying. The ship is equipped with a turntable ...
The Office of Environmental Management's (EM) Roadmap, U.S. Department of Energy--Office of Environmental Management Engineering & Technology Roadmap (Roadmap), defines the Department's intent to reduce the technical risk and uncertainty in its cleanup programs. The unique nature of many of the remaining facilities will require a strong and responsive engineering and technology program to improve worker and public safety, and reduce costs and environmental impacts while completing the cleanup program. The technical risks and uncertainties associated with cleanup program were identified through: (1) project risk assessments, (2) programmatic external technical reviews and technology readiness assessments, and (3) direct site input. In order to address these needs, the technical risks and uncertainties were compiled and divided into the program areas of: Waste ...
This patent describes an oil-filled electric cable and a manufacturing method for said cable, in which the solid insulation is formed, at least in part, by separately applied, alternate layers of cellulose paper tape and of film tapes made of plastic. Prior to application of the tapes around the cable conductor, the moisture content of the paper tape is selected and the swelling of the plastic tape by the oil after application is adjusted, if necessary, such as by immersing the plastic tape in the oil prior to application, so that the swelling of the plastic tape by the oil in the formed cable is offset by the shrinkage of the paper tape during drying of the cable. Also, an apparatus for pre-swelling the plastic tape is described. 4 figs.
ABB High Voltage Cables AB started the MPS (More Power Submarine cables) project in 1993 with a view to exploring new technology opportunities. The goal is to design and type test a submarine HVDC cable for a capacity of 1200 MW at 600 kV. On the day before ABB announced its success in winning the contract for the world`s largest ever submarine HVDC link project for the gigantic Bakun project in Malaysia, ABB Power Systems described progress to date at a symposium in Karlskrona. The proceedings included a test demonstration on an extruded cable which eventually broke down at a stress of over 935 kV -not in the insulation itself but in the end terminations. The electric field was in excess of 200 kV/mm which is higher than ever before reported. (UK)
Only two types of 110-kV-cables: Namely XLPE-Cables and External-Gas-Pressure-Cables will be reinstalled in the Federal Republic of Germany. XLPE-Cables have been already developed for higher voltages. An idea how the external-gas-pressure-cable could be made fit for higher voltage levels will be given in this paper. (orig.) [Deutsch] In der Bundesrepublik Deutschland werden in der Zukunft nur noch zwei Kabeltypen der 110-kV-Ebene den Kabelmarkt beherrschen, naemlich: VPE-Kabel und Gasaussendruck-Kabel. Waehrend VPE-Kabel auch fuer hoehere Spannungsebenen bereits entwickelt worden sind, wird im folgenden vorgeschlagen, wie auch das Prinzip der Gasaussendruck-Kabel zu hoeheren Spannungen hin erweitert werden kann. (orig.)
Many oil-insulated electric power cables are limited by heat buildup caused in part by the low thermal conductivity of the oil. Circulation of the oil is known to reduce the cable temperature, but can lead to excessive pressure buildup on long cables when using conventional pumping methods. An alternate pumping method using distributed electric fields to avoid this pressure buildup is described. Electrohydrodynamic (EHD) pumping was studied both theoretically and experimentally for possible application in underground cable cooling. Theoretical studies included both analytical and finite-element analysis of the flow patterns driven by travelling electric fields. Experimentally, flow rates in a cable-pipe model were measured under a wide variety of operating conditions. Theory and experiment are in agreement for velocities below 10 cm/s, but higher velocities could not be reached in ...
The development and installation, by Hydro-Quebec, of a computerized pressure monitoring and control system on its fluid-filled high voltage underground cable network in Montreal, was described. The average age of these underground fluid-filled cables is more than 30 years and the cost to replace the circuits is estimated to be 230 million dollars. It is, therefore, crucial to maintain at all times and under all operating conditions a positive oil pressure in order to maintain the dielectric strength of paper insulation, and to prevent air and moisture from entering the cables and accessories. The monitoring and control system is reliable, flexible, user friendly and easy to upgrade. It reduces intervention time on the cables and ensures the protection of the cable network by remotely operating valves to connect oil reserve banks and by providing efficient maintenance management ...
The volume examines the scientific interfaces and technological applications of physics. Twelve areas are dealt with: biological physics--biophysics, the brain, and theoretical biology; the physics-chemistry interface--instrumentation, surfaces, neutron and synchrotron radiation, polymers, organic electronic materials; materials science; geophysics--tectonics, the atmosphere and oceans, planets, drilling and seismic exploration, and remote sensing; computational physics--complex systems and applications in basic research; mathematics--field theory and chaos; microelectronics--integrated circuits, miniaturization, future trends; optical information technologies--fiber optics and photonics; instrumentation; physics applications to energy needs and the environment; national security--devices, weapons, and arms control; medical physics--radiology, ultrasonics, NMR, and photonics. An executive summary and many chapters contain recommendations regarding funding, ...
On November 2, 1974, Skelly and Loy submitted recommendations to the United States Environmental Protection Agency concerning establishment of effluent limitations for the Coal Mining Point Source Category, culminating an exhaustive study of water treatment technology within the coal industry. Members of the National Coal Association alleged that the efficiency of acid mine drainage treatment plants and settling basins is seriously reduced during winter and spring seasons. The original study was conducted during the summer months, and review of historical seasonal effluent data indicated there may be validity to this claim. To validate and confirm the conclusions and proposed effluent limitations established in part from this historical data, a further sampling program was conducted during the winter and spring of 1975. This report presents the findings of that sampling program, and correlates previously collected sample data into a ...
The electric explosion of a conductor being part of an electric cable is studied. It is ascertained that the electric properties of a polymeric dielectric depend nonlinearly on the maintenance of the ultradisperse metal filler. In the course of the numerous heating-cooling processes of an insulator, a streamlining of the structure of a polymeric composite occurs.
This paper describes radiography as one of the most efficient and cost effective methods for inspecting electric cabls. Details of one project in particular, i.e., the inspection of high-pressure, oil-filled, pipe-type cables (HPOF) are given. 2 refs.
A study was carried out to identify optimal laminate/oil combinations for low pressure oil filled and high pressure pipe-type cables, and to establish taping criteria under factory conditions. Laminates from two sources were evaluated in conjunction with Sun XX high viscosity mineral oil and Cosden 015SH polybutene oil for high pressure type cables, and Dussek TC-2288N mineral oil, Shell P2 dedecylbenzene and Chevron DF-100 alkylbenzene for low pressure oil-filled cables. Swelling tests, infrared analysis, dissipation and dielectric measurements, impulse tests and a taping trial were performed. It was found that there is no appreciable difference in performance of both laminates when tested on model cables in a variety of oils. Both types exhibited superior aging characteristics vis-a-vis cellulose paper when tested with a variety of oils and at temperatures up to 105{degree}C. For pipe type ...
Responsibility for the operation and maintenance of the bulk of the 132 kV cable network in England and Wales was transferred from the CEGB to the area boards in the 1970s. Norweb has successfully dealt with the increase in work using in-house expertise exclusively.
The American Organization of Nurse Executives (AONE) and The Leadership Studio have collaborated to create a one-of-a-kind Executive Coaching Resource Center for nurse leaders and their teams. This resource-designed specifically for AONE members-is a one-stop web-based library developed to assist nurse leaders who want to learn more about utilizing executive coaching services. It focuses on the overall benefits of coaching for nurse leaders-both tangible and intangible-and provides return on investment information for executive coaching based on the most current research.
The defects localization in power cables follows several steps: identification, pre-localization and precise localization. Pre-localization methods, other than echo-metry, are presented first: bridge methods, particular case of low voltage networks, future perspectives. Then, the precise localization methods are described: magneto-acoustic method, audible frequencies method. The particular case of underwater and high-voltage cables is considered too (oil and gas leaks detection). (J.S.)
A back-up system is provided for a pumping plant or a pressure reservoir system used to maintain insulating oil under pressure in high voltage submarine power cables which includes a gas driven membrane pump to insure a small outflow of oil at a rupture point in the power cable to prevent water from penetrating the cable. The proper operation of the membrane pump is insured by introducing degasified oil at the drive side of the pump during the stand-by and test modes of operation of the back-up system. 11 drawings.
The steady state ampacity is calculated for mixed electric power underground cable circuits in a single trench or ductbank. The methodology presented in this paper can be applied to any practical number of balanced, three phase circuits (each in trefoil, pipe or conduit) of different voltage classes, cable sizes, load currents and cable systems to located anywhere within a single trench or ductbank. The different thermal resistivities of the backfill or ductbank and the surrounding soil are taken into consideration. A practical example for 10 circuits in a trench is provided.
The upgrading of several 69 kV pipe-type cable feeders on the Potomac Electric Power Company (PEPCo) transmission cable system is discussed. The methods used for the ampacity calculation are described. The fluid circulation approach required to meet the feeder emergency load requirements are discussed. For the feeders that were in service for approximately 40 years, a system life evaluation was performed.
This paper is concerned with methods of limiting the build-up of transient voltages between sheath and armor in long armored power cables. Calculations by a frequency dependent cable model demonstrate that this voltage can be efficiently limited to an acceptable level by introducing sheath-armor bondings at regular intervals, or by using a semiconductive sheath-armor interlayer. The paper investigates the required minimum length between bondings, as well as the required conductivity of the sheath-armor interlayer if the use of bondings is to be avoided.
Nexans has developed a new type of high voltage sea cable with metal barrier for dynamic application, suited for floating installations such as vessels, floating wind turbines or floating platforms. A brief presentation of the cable's design (ml)
A new type of impregnation jelly can be used instead of traditional oil may reduce the formation of cavities in marine high-voltage direct current cables. This provides a foundation for the development of cables with improved insulation and for higher power. This was a conclusion of the Norwegian ''EFFEKT''-project. Using the jelly reduces the size of the cavities substantially and no discharges seem to occur during formation, growth and collapse of cavities. It is also environmentally friendly, since there is no leakage of oil.
A new method of pinpointing dielectric fluid leaks on pipe-type and self-contained cables using perfluorocarbon tracer (PFT) is presented. The method has successfully been used on the Con Edison transmission system to locate leaks of dielectric fluid on both types of cables. Application of the PFT technique does not require feeder deenergization and provides major advantages over the conventional method of freeze and pressure testing. Description of the method and results of field application are presented in the paper.
A high voltage oil-impregnated electrical cable with fully polymer taped insulation operable to 765 kV. Biaxially oriented, specially processed, polyethylene, polybutene or polypropylene tape with an embossed pattern is wound in multiple layers over a conductive core with a permeable screen around the insulation. Conventional oil which closely matches the dielectric constant of the tape is used, and the cable can be impregnated after field installation because of its excellent impregnation characteristics.
A proposed project by which the island of Jersy could buy electric power from France is discussed. The interconnector will be capable of transmitting up to 50MW. Included in the project will be 27 km of submarine cable and 23 km of underground cable. An oil-filled cable containing 120 mm diameter copper conductors and weighing 47 kg/m is used. Details of the installation and oil system are given.
Radiation degradation of polycarbonate (PC) and polybutylene terephthalate (PBT) used as cable connector was evaluated using DSC, TGA, and mechanical properties. Glass transition temperature, melting temperature, 5% weight loss temperature, elongation at break, and tensile strength measurements were carried out for each of {gamma}-ray irradiated samples. In the results of those analyses, PC has radiation resistance better than PBT as a cable connector material.
Equations are compiled for thermal balance in which for simplification, no consideration is made for heat conductivity along the axis of the cable and dependence of losses, heat capacitance and heat conductivity on temperature. Equations are modeled on a transistor analog calculator 42 TA. The solution to the task on the computer produced values of maximum temperature on the cable and coordinates of the point of maximum overheating. Using the analog model, one can study other parameters of the thermal mode.
Conventional methods for calculating electricity losses in pipe-type cable systems rely heavily on data measured in lower-voltage systems in the 1950s. With the new technique developed in this study, engineers can compute power losses more precisely for cables of various configurations and voltage ratings.
Limitations of traveling wave relaying schemes for protection of overhead extra-high voltage transmission lines are investigated. A method of analysis of traveling wave phenomena for three phase transmission lines is developed in which the interdependent phase voltages and currents are decoupled into their modal counterparts, which are approximately independent. A time domain digital simulation program is used to solve the modal transmission line equations to obtain the fault induced traveling waves detected at the relay location. The frequency dependence of the aerial modes is ignored but their losses are included. A lumped element analysis method, originally developed for transient analysis of lossy coaxial cables, is adapted here to obtain approximate solution for the fault induced traveling waves of the ground mode. Excellent agreement is found between the results obtained by this method and frequency domain methods. This time-domain method ...
The behavior of a small power system consisting of two interconnected generators is simulated in real-time by a prototype Digital Transient Network Analyzer (TNA). The prototype Digital TNA consists of two Computational Modules and one I/O Module. The Modules communicate with each other through ribbon cables. Each Computational Module simulates one Turbo-Generator, its Transformer, its Governor, Exciter, and Power System Stabilizer Systems. The numerical integration is shared by two TMS320C30 DSPs at a step-size of 100 microseconds in real-time. The I/O module post-processes the state variables and presents selected information for analog display. The paper presents oscillograms from a test program which includes symmetry checks and behavioral checks against well known waveforms of hunting oscillations, synchronization out-of-phase torques, and subsynchronous resonance phenomena. The success of the Digital TNA depends on: (a) the theoretical ...
Alanine/EPR Dosimetry system is classified as a reference-standard dosimeter which used to calibrate radiation environments and to calibrate routine dosimeters in absorbed dose range of 1 to 105 Gy. Characteristics of Alanine/EPR dosimetry system are better suitable than routinely used personnel dosimeters for the long term radiation measurement in harsh condition of Nuclear power plant : This system is not significantly affected by temperature and humidity and also has low fading rate. About 1 year ago, Alanine and Lithium compound dosimeters were installed at Wolsung unit 1 for the environment monitoring as a part of equipment qualification program. 35 positions which are most severe and representative cable positions were chosen for radiation and temperature monitoring. The recovered alanine dosimeter in the period of maintenance was measured by E-scan alanine analyzer system, Meanwhile measurement result shows extremely high radiation level ...
Alanine/EPR Dosimetry system is classified as a reference-standard dosimeter which used to calibrate radiation environments and to calibrate routine dosimeters in absorbed dose range of 1 to 105 Gy. Characteristics of Alanine/EPR dosimetry system are better suitable than routinely used personnel dosimeters for the long term radiation measurement in harsh condition of Nuclear power plant : This system is not significantly affected by temperature and humidity and also has low fading rate. About 1 year ago, Alanine and Lithium compound dosimeters were installed at Wolsung unit 1 for the environment monitoring as a part of equipment qualification program. 35 positions which are most severe and representative cable positions were chosen for radiation and temperature monitoring. The recovered alanine dosimeter in the period of maintenance was measured by E-scan alanine analyzer system, Meanwhile measurement result shows extremely high radiation level ...
This paper describes a Honshu-Shikoku linking transmission cable building plan and its technical features. The Chugoku District and the Shikoku District are supplied with power currently by the Chugoku-Shikoku trunk line of 220,000 volts. To cope with the anticipated power shortage, a plan was established to install power cables for 500,000 volts on the Honshu-Shikoku connecting bridge. The plan calls far an installation length of 127.4 km and a transmission capacity of 1.2 million kW per line. The cable installation on the Seto Bridge was completed already, the construction is now in the peak period for building steel towers on the land sections, and laying overhead cables and underground cables. Commencement of the operation is scheduled 1994 on one liner, and 2000 on two lines. The technical features include the Japan's first large-capacity, long-distance underground ...
This patent discloses an oil-filled, multi-core, electric cable having three cores within a metal sheath suitable for underwater applications. Each core has a conductor surrounded by insulation and has substantially the same outer dimensions as the other cores. One conductor is made of copper and has a central oil duct. The other conductors are made of stranded aluminum wires in side-by-side and contacting relation and the ratio of the cross-sectional area of the metal of the copper conductor to the cross-sectional area of the metal of each aluminum conductor is the reciprocal of the ratio of the electrical conductivities thereof. One object of this invention is that of overcoming the drawbacks existing in the known oil-filled, multi-core cables, i.e. to provide cable which, in case of a rupture of the cable sheath, has fairly small leakages of insulating, fluid oil from the cable ...
In 1976, the US Department of Energy and New York State - ERDA granted a contract for the development of a +-600 kV dc underground transmission cable system looking to inevitable future requirements in the US for economic, high-capacity, long-distance underground transmission linking remote generating stations to metropolitan load centers. This project was comprehensive and dealt with three separate system components, i.e., cable, splice, and terminals. In each instance, for each component, development required an intensive R and D effort, focused on the following categories: insulating materials, model testing, design of full-scale prototype, manufacturer of prototype, and laboratory development testing. Insulating papers and oils were selected, and model studies performed, for both self-contained type and pipe type oil-filled cables. However, only the pipe cable design was finally designated for ...
Transmission terminations available today are very reliable, but they need to be. In the field, they are continually exposed to pollution and extremes of ambient temperature. In many cases, they are in the rifle sights of vandals. In contrast, cable joints - often cited as the weakest links from an electrical viewpoint - are generally protected from physical damage underground and many of the short cable systems being installed in the US today can be built without joints. All cable systems need terminations - mostly to air-insulated equipment. At 69 through 138 kV, there is intense competition among manufacturers to supply terminations for solid-dielectric cable that are low in cost, reliable, and require a minimum of skill to install. Some utilities are looking also for terminations that fit a range of cable sizes; terminations that do not contain liquid that can leak out; and ...
This report presents information obtained during five different studies of field effects from high voltage transmission lines performed at EPRI's High Voltage Transmission Research Center. The first study is the development of a methodology for the evaluation of the expected frequency of occurrence of specific short-term effects of spark discharges and induced currents caused by overhead high voltage transmission lines. The methodology is divided into the analysis of the expected frequency of occurrence of situations in which induction effects may occur, and the analysis of the expected severity of the effect. The second study is of the electric field in the surface and on the immediate proximity of the strands of stranded conductors used for overhead high voltage lines. In particular, the cases of deformations of stranded conductors, caused by air expansion or by popped out strands, are analyzed for the purpose of determining the conditions for occurrence of corona in fair ...
The Mittelplate oilfield is located in the Waddensea tidelands 8 km off the north sea coast and represents Germany's largest oilfield. Since Mittelplate oil production has started in 1987, RWE Dea AG being the operator in a 50/50 joint venture with Wintershall AG, has continually implemented and improved the sophisticated technology required to exploit natural resources by using safe and environmentally compatible means in the sensitive tideland environment of Mittelplate. Besides the sucessful offshore operations from the man-made Mittelplate Drilling and Production Island, further onshore development has started in 2000 by producing from high-tech ERD wells drilled from onshore locations. The offshore oil production had been transported so far by specially designed tug and tow barges and had been restricted by weather and tide. To overcome this bottleneck and to enable an accelerated offshore drilling and production program a pipeline link between ...
Soil electrical resistivity is perhaps the only soil parameter that is used by geologists and geotechnical engineers to explore the subsurface characteristics at a power plant site and also used by civil and electrical engineers as input to their design. A properly designed and executed field electrical resistivity survey is one method of examining the subsurface profile. The same program can provide information about the corrosion potential of the soil that can play a major role in determining the protection needed for buried steel piping and pile foundations. At the same time, the soil conductivity interpreted from the results of the resistivity testing is an integral part of the design of the electrical grounding system for the plant. This paper describes soil electrical resistivity, test procedures to estimate resistivity values, and how these values can best be used to obtain the parameters required for successful power plant design. ...
The PSDE/SAT-2 multimission satellite designed to offer a flight opportunity to different experimental communication payloads and verify the feasibility of advanced space technologies is described. It was conceived for expriment in the framework of the European DRS (Data Relay Satellite) program thus providing intersatellite and interorbit communication links, but also experimental and preoperative services. Payloads include optical communication single access payload (LSA); S-Band single access payload; S-Band multiple access payload; land mobile experimental payload; navigation payload; 40/50 GHz communication payload; and millimeter wave propagation payload. The orbital slot and interference analysis identified a limited number of orbital positions for the mission interleaved between Eutelsat satellites (i.e., 14 deg 30 min E and 17 deg 30 min E). A coordination is required in Ku-Band with Eutelsat satellites and in Ka-Band with ITALSAT (Italy) and TOR-12 (USSR) ...
Research performed under this contract was divided into four tasks under the following headings: Task 1, Characterization of fly ash; Task 2, Measurements of the optical constants of slags; Task 3, Calculations of the radiant properties of fly ash dispersions; and Task 4, Measurements of the radiant properties of fly ash dispersions. Tasks 1 and 4 constituted the Ph.D. research topic of Sarbajit Ghosal, while Tasks 2 and 3 constituted the Ph.D. research topic of Jon Ebert. Together their doctoral dissertations give a complete account of the work performed. This final report, issued in two volumes consists of an executive summary of the whole program followed by the dissertation of Ghosal and Ebert. Volume 2 contains the dissertation of Ebert which covers the measurements of the optical constants of slags, and calculations of the radiant properties of fly ash dispersions. A list of publications and conference presentations resulting from the ...
This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan ...
The fundamental tasks of the Oak Ridge Y-12 Plant maintenance operations are planning, scheduling, executing, postmaintenance testing, completing the maintenance job, and supporting these activities with administrative and technical assistance. The Department of Energy (DOE) ``Maintenance Management Program`` guidelines require that we use a graded approach for applying formality and documentation to these maintenance operations. The most-rigorous controls should be placed on maintaining the most-vital systems, structures, and components (SSCs). We must understand risk assessments in order to evaluate which SSCs are most vital. The product of this assessment process is a well-developed understanding of where to apply the most rigor, formality, and documentation. Once we have determined where, we must determine how to apply maintenance so as to mitigate risk. Fundamental to determining how to apply it is an understanding of the main difference ...
The objective of this Energy Engineering Analysis (EEA) for LSAAP is threefold: Develop a systematic plan of projects which will result in reducing energy consumption. Consider renewable energy sources with the objective of establishing an orderly procedure for reducing use of non-renewable energy sources. Determine the feasibility of Total Energy (TE), Selective Energy (SE), and Central Heating Plant (CHP) concepts using alternative fuels. In essence, an assessment of the entire energy picture at LSAAP was undertaken. This report is a summary of that effort. LSAAP was originally built during 1941 and 1942 as a shell loading plant for the Army. After World War II, the facility was deactivated until 1951 when it was reactivated as a Government Owned, Contractor Operated (GOCO) facility. Day and Zimmerman was selected as the operator in 1951 and has been the operating contractor ever since. Located just west of Texarkana, Texas, LSAAP encompasses an area of approximately 15,546 acres. ...
An Ethernet based embedded system has been developed to upgrade the Beam Viewer and Beam Position Monitor (BPM) systems within the free-electron laser (FEL) project at Jefferson Lab. The embedded microcontroller was mounted on the front-end I/O cards with software packages such as Experimental Physics and Industrial Control System (EPICS) and Real Time Executive for Multiprocessor System (RTEMS) running as an Input/Output Controller (IOC). By cross compiling with the EPICS, the RTEMS kernel, IOC device supports, and databases all of these can be downloaded into the microcontroller. The first version of the BPM electronics based on the embedded controller was built and is currently running in our FEL system. The new version of BPM that will use a Single Board IOC (SBIOC), which integrates with an Field Programming Gate Array (FPGA) and a ColdFire embedded microcontroller, is presently under development. The new system has the features of a low ...
The paper begins with an introduction on the reasons that lead to the use of HVDC submarine cable links. The main aspects for the choice of direct current are presented as well as the advantages deriving from the utilization of submarine cables. The second part is dedicated to a discussion on the various type of insulation that could be used in power cables and their possible application to HVDC submarine cables. In the following there is a description of the main characteristics and technical details of some particular project that at present time (1995) are in progress. Two projects are briefly presented: Spain-Morocco, a 26 km long interconnection for the transmission, in a first phase, of 700 MW from Spain to Morocco at 400 kV a.c. by means of three cables, plus one spare, of the fluid filled type. The cables are designed for a future change to d.c. 450 kV, ...
The purpose of this document is to describe the NIF Project Organization and the roles and responsibilities of the managers charged with executing the Project.
This Maintenance Implementation Plan (MIP)was developed for implementation of the U.S. Department of Energy (DOE) Order 4330.4A, A Maintenance Implementation Program (DOE 1990) which has been replaced by 4330.4B (DOE 1994) at the Hanford Site SWM complex. It addresses maintenance functions associated with SWM, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for SWM was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The objective of this MIP is to provide baseline information for the control and execution of SWM Maintenance activities relative to the requirements of Order 4330.4B, Chapter II. (Nuclear Facilities) It also describes actions that are planned to achieve compliance. Section 2.0 of this MIP summarizes the mission, ...
The set of activities performed by SENTECH, Inc. addressed the specific recommendations provided to the Department of Energy (DOE) by its advisors, including the Hydrogen Technical Advisory Panel and the review panel members of the DOE Annual Hydrogen Program Review. SENTECH`s efforts were conducted under five tasks: Task 1: Technology and Process Analysis; Task 2: Hydrogen Information Development and Transfer; Task 3: Educational Products; Task 4: Systems Analysis; and Task 5: Life Cycle Costs. SENTECH activities were executed in two broad areas--analysis and technology transfer. The analytical tasks undertaken in FY97 were focused on two types of analysis--systems analysis and technical/economic assessments. These analytical activities benefit DOE by providing data that allow it to define the strategic goals of the hydrogen R and D program. By collecting analysis of the energy efficiency, environmental externality, and ...
BC Hydro`s approach to improve the performance of its underground transmission lines by employing new computer technology with fibre optic cables was described. Known as Distributed Temperature Sensing (DTS), the technology is expected to increase the capacity of the most heavily-loaded sections of its seven kilometer underground 230 kV transmission system in the Greater Vancouver area. Although it is also a concern in overhead wires, heating is particularly problematic in underground cable systems. DTS uses opto-electronic equipment to launch a laser light down conventional communications-grade fibre optic cables, installed in the same duct as the cables, or in a spare duct next to them. By using high speed measurements and computer processing, it is possible to determine the temperature all along the fibre with very high accuracy, and to locate any point along the length of the ...
On February 9, 1995 ComEd experienced a pipe type cable failure on 138kV line 13717. Line 1737 is a bulk power transmission cable circuit connecting The Fisk and Crawford generating stations located within city limits. The line is approximately 4.5 miles long and was originally installed in 1975. This line is forced cooled, has 2,500 KCMIL copper conductors with 505 mils of paper insulation in an 8 inch pritec coated steel pipe. The splices are constructed with Voltalit castings. The failure occurred approximately 3,500 feet from Crawford Station. It was easy to locate the failure since the cable joint casing was breached resulting in the loss of approximately 2,600--2,700 gallons of dielectric fluid. Upon field examination B Phase was determined to have failed. The failure occurred 12 inches inside the casing in an area where it was impossible to install a long connector or add an additional short length of ...
A general calculation method for the analysis of transmission capability of a long-distance single-core ac submarine cable system is presented. The method is based on modal transformation of voltages and currents in multiconductor cable systems. Using this method, numerical calculations on 500 kV submarine cable systems have been performed with particular reference to the effect of the distance between bonds connecting metallic sheath, outer conductor and armor on the transmission capacity of the system. It was clarified that the transmission capacity of the system increased with decreasing bond intervals. Examination of the current distributions between various conductors along the length showed that this increase of transmission capacity was mainly due to the dispersion of the charging current into the metallic sheath, outer conductor and armoring at the bonding points. Analytical results for the transmission capacities ...
The integrity of the cables located in the target room is very important in the Fire PSA, because the CDF and CCDP are changed according to the results of a cable integrity that depends on the surrounding gas temperature. The conservative assumptions used in the Fire PSA typically specify that all of the equipment and cables of a room would fail when a fire happens in the room. But the realistic assessment of a fire risk by using a fire simulation tool has become necessary in the Fire PSA as described in the ANS Fire PRA Standard. This paper evaluates the cable integrity of eight pump rooms in the nuclear power plant by using the CFAST zone fire model. The upper layer gas temperature of each room is estimated, and an analysis based on the results of model simulations is used to judge the cable integrity. According to the analysis results, the integrity of the ...
A detailed examination of the aging processes that may take place in solid-dielectric extruded-type high voltage transmission cables under dry conditions is presented. Particular emphasis is placed on the aging process as affected by the separate and simultaneous action of four main aging factors, namely the electrical, mechanical and thermal stresses, and the physical and chemical environment. A number of pertinent aging models are considered and their validity and applicability to accelerated aging tests on solid-type transmission cables are discussed.
A radial-flow type internally oil-cooled oil-filled cable has been developed. This system is characterized in that the oil flows radially through the paper insulation. The thermal resistance of the insulation is equivalently decreased by the radial-flow. The decreased thermal resistance as well as the cooling effect of the oil flow in the central oil duct and the outer oil duct under an aluminum sheath increase the current capacity. A calculation method of cooling characteristics is introduced. The stability of the cable and accessories was confirmed through initial electrical tests and a long-term field test.
The homogeneity of the magnetic field in the LHC dipoles strongly depends on the correct position of the superconducting cables: this is related to the quality of the dipole components, such as the dimension of the coil spacers (copper wedges), of the cable and of the collars. The performance in operational conditions is also affected by the magnetization of the cables. In this work, we analyse the measurements of these quantities during the production of the 1276 LHC dipoles, their trends, and the relation to the measured magnetic field. A novel mtehod to locate electrical shorts based on the analysis of magnetic measurements is also presented, and applications to 15 dipoles reascued during the production is given.
Korea Atomic Energy Research Institute (KAERI) has been developing the integral reactor. The reactor head structure assembly (RHSA) is the structure installed over the reactor cover. Due to the characteristics of an integral reactor, there are many instrument cables and power cables coming out from the reactor cover and main components. The RHSA provides an interface location to connect these cables from Architecture Engineer (AE) and System Designer (SD). It also prevents a pipe whip and it prohibits instruments from becoming missiles. In this research, the axiomatic design approach for the RHSA is performed.
The State Energy Conservation Office has executed its first Fuel Cell Project which was awarded under a Department of Energy competitive grant process. The Texas LPG Fuel Processor Development and Fuel Cell Demonstration Program is a broad-based public/private partnership led by the Texas State Energy Conservation Office (SECO). Partners include the Alternative Fuels Research and Education Division (AFRED) of the Railroad Commission of Texas; Plug Power, Inc., Latham, NY, UOP/HyRadix, Des Plaines, IL; Southwest Research Institute (SwRI), San Antonio, TX; the Texas Natural Resource Conservation Commission (TNRCC), and the Texas Department of Transportation (TxDOT). The team proposes to mount a development and demonstration program to field-test and evaluate markets for HyRadix?s LPG fuel processor system integrated into Plug Power?s residential-scale GenSys 5C (5 kW) PEM fuel cell system in a variety of building ...
Earlier studies had concluded that the preferred direction of the rocket nozzle should ..... Center had to redesign the sensor canisters, brackets and cable supports. ... depending on inspection of the quality of the incoming pictures in real-time. ...
Beginning in 1972 low-pressure cables filled with MN-4 oil produced by the Yaroslav Petroleum Processing Plant arrived at the Leningrad Cable Network of the Leningrad Rayon Power Administration. Lines formed with these cables have been successfully used. The parameters of the oil in them have not changed with respect to the values present when the lines were placed in operation. However, from here on filling in of the 110 to 220 kV input lines of low and high pressure will be accomplished with MN-4 oil produced by the Gorkiy Petroleum Processing Plant. Because petroleum from various fields and the properties of the oil produced from it are unlike, samples were taken from some elements of the lines filled in with MN-4 oil. The results of the tests are described.
CIGRE has set up a new working group - Insulated High Voltage Cables - under the auspices of Study Group 21. The working group will examine the various techniques used for the installation of HV and EHV cables and the design parameters to be applied. Twelve installation techniques are known, but only three of these ar used at present. Following an international study carried out by the working group, a clear picture of the state of the art in 1998 has emerged. It has also been possible to identify future trends in the design of buried circuits. (authors)
Full text of publication follows: The Nuclear Power Plants (NPPs) are always designed for the highest level of safety against postulated accidents which may be initiated due to internal or external causes. One of the external/internal causes, which may lead to accident in the reactor and its associated systems, is fire in certain vital areas of the plant. Conventionally, the fire containment approach and/or the fire confinement approach is used in designing the fire protection systems of NPPs. Indian NPPs (PHWRs) follow the combined approach to ensure plant safety and all newly designed plants are required to comply with the provisions of Atomic Energy Regulatory Board (AERB) fire safety Guide. In respect of older plants, the reassessment of adequacy of fire safety provisions in the light of current advances has becomes essential so as to decide upon the steps for retrofitting. Keeping this in mind the deterministic fire hazard analysis was carried out for the Madras Atomic Power ...
The integrity of the cables located in the target room is very important in the Fire PSA, because the CDF and CCDP are changed according to the results of a cable integrity that depends on the surrounding gas temperature. The conservative assumptions used in the Fire PSA typically specify that all of the equipment and cables of a room would fail when a fire happens in the room. But the realistic assessment of a fire risk by using a fire simulation tool has become necessary in the Fire PSA as described in the ANS Fire PRA Standard. This paper evaluates the cable integrity of eight pump rooms in the nuclear power plant by using the CFAST zone fire model. The upper layer gas temperature of each room is estimated, and an analysis based on the results of model simulations is used to judge the c...
This paper describes the specifications, conceptual design, prototype testing and operating experience of an oil-filled high voltage pulse transmission cable adapted from commercially available air-dielectric RF components. Lawrence Livermore National Laboratory's Advanced Test Accelerator (ATA) requires a method of transmitting 250kV, 70 nanosecond pulses from the power conditioning equipment to the accelerator. The oil-filled cable approach was chosen over alternative concepts because of its high voltage holding capacity, long life and flexibility. The criteria for cable and connector design are discussed. The results of prototype testing and performance of the final design are presented.
This plan establishes a Department-wide goal to reduce total releases of toxic chemicals to the environment and off-site transfers of such toxic chemicals by 50 percent by December 31, 1999, in compliance with Executive Order 12856. Each site that meets the threshold quantities of toxic chemicals established in the Emergency Planning and Community Right-to-Know Act (EPCRA) will participate in this goal. In addition, each DOE site will establish site-specific goals to reduce generation of hazardous, radioactive, radioactive mixed, and sanitary wastes and pollutants, as applicable. Implementation of this plan will represent a major step toward the environmental risks and costs associated with DOE operations and increasing the Department's use of preventive environmental management practices. Investing in Waste Minimization Pollution Prevention (WMin/PP) steadily reduce hazardous and radioactive waste generation and will reduce the need for waste management and ...
After five years of implantation of a program for classification and signalling of restricted areas in the IPEN-CNEN-SP, we noticed that the applied measures of radio protection contributed for the improvement of the system of occupational radiological protection, promoting an improvement in the security of the workers, towards the planning in the execution of the activities involving the use of sources of ionizing radiation. Later, during the implantation of this program, the service of occupational radiological protection, there was great difficulty to conciliate its necessities in terms of security signalling, face the absence of existing standardisation in the country for the minimum disposals on the subject in question. Nowadays there are different interpretations of the specific criteria and many effective normative documents that exist in the country. This work presents as proposal the elaboration of a technical ...
Field data for validating plume models were collected in and around the Bull Run Steam Plant during two four-week periods between July and October, 1982. The field measurements were the second phase of the Plume Model Validation and Development (PMV and D) program. The Bull Run Steam Plant is located near Oak Ridge, Tennessee, and the area is described as the ''Moderately Complex Site'' to distinguish it from the ''Plains Site'' in eastern Illinois, which was the scene of the first phase of the PMV and D study conducted in 1980-81. The measurement program consisted of a set of meteorological, source, aerometric, and tracer measurements to track and characterize the plume. The tracer measurements constituted the largest portion of the total effort, and it involved the release of SF/sub 6/ tracer gas from the stack, and the sampling and analysis of nearly 64,000 air samples ...
Integrating technology readiness levels (TRL) into the management of engineering projects is critical to the mitigation of risk and improved customer/supplier communications. TRLs provide a common framework and language with which consistent comparisons of different technologies and approaches can be made. At Sandia National Laboratories, where technologies are developed, integrated and deployed into high consequence systems, the use of TRLs may be transformational. They are technology independent and span the full range of technology development including scientific and applied research, identification of customer requirements, modeling and simulation, identification of environments, testing and integration. With this report, we provide a reference set of definitions for TRLs and a brief history of TRLs at Sandia National Laboratories. We then propose and describe two approaches that may be used to integrate TRLs into the NW SMU business practices. In the first approach, we analyze ...
At the Borssele Nuclear Power Station, which has been in operation since 1973, a comprehensive program of modifications, one of the most extensive of its kind worldwide, was conducted in 1997 within the framework of an integral safety evaluation carried out at ten-year intervals, especially in the nuclear section. The collective dose associated with this activity was greatly reduced by Alara measures, one of which was chemical decontamination of part of the emergency and residual heat removal systems. An average decontamination factor (DF) of 17 was achieved by using the Siemens Cord UV process. Two decontamination cycles were required. The decontamination program took three days to be completed. The planned collective dose was reduced from 1029 mSv (without decontamination) to 335 mSv (on the basis of a DF of 8). Based on the DF of 17 achieved, the planned dose was corrected downward to 270 mSv. The dose finally achieved was 118 mSv. A total ...
In order to predict or to evaluate the structural reliability of a variety of nuclear components under actual changing operating conditions, it is necessary to take the detailed geometrical features of components into consideration on one hand, and thermo-mechanical loading conditions with space and time variations during the lifetime, on the other hand. This consideration leads the authors to develop a super large-scale structural analysis program based on a parallel computational FEM with a variable scale of PC cluster architecture, whose prototype system is presented in a companion paper in this Symposium. Development of the PC cluster technology is one of the most important subjects in large-scale structural simulation, reducing computer costs and thus making simulation more acceptable to the engineering community. This paper presents the developmental status of the parallel FEM solver, demonstrating computational capabilities with three dimensional effects ...
The report presents technical and economical aspects of underground cables compared to overhead lines in Norway in high voltage transmission systems above 22 kV. The economical comparison between the two options includes capital costs of installation (investment costs), maintenance costs and costs of electrical losses. The main technical issues discussed are reliability and flexibility. 35 refs., 23 figs., 29 tabs.
Heavy high viscosity oils, transformer oils, and very light low viscosity oils have been used in a Norwegian company in the impregnation, sheathing, and installation of paper insulated cables. The aim...Full Text Available
The electrophysical characteristics of the electric cable?s transition into a state of a heterogenic polymer system due to a wire?s explosion were examined. Using cyclic heating-cooling of the composite, the changes in its topology were observed. The latter makes it possible to regulate the dielectric characteristics of the system.
The focus of general public concern on the environment results in the use of underground lines being considered since they offer alternative or interesting complementary solutions for the bulk transmission of electrical energy. This leads to the installation of underground cables in some areas, where overhead lines would automatically have been considered in the past.
A liquid barrier filter for use in fluorescence microscopy of strongly autofluorescent plant tissues is described. The filter consists of a methanol solution of cupric chloride and ferric chloride and isolates fluorescein fluorescence from the strong red autofluorescence of photosynthetic plant tissues. Subcortical actin cables in the giant alga Chara are being visualized through use of this filter together with heavy meromyosin labeling. PMID:90068
Installation of the electrical equipment at the Barstow Solar Pilot Plant is the concern of this construction package. Technical specifications for power and instrument cables, meteorological instruments, and control cables are defined. The documentation requirements are briefly discussed.
This paper reports on the protection of opening that are exposed to the environment in nuclear facilities which presents an almost overwhelming engineering challenge. Intakes and outflows must permit the passage of large volumes of air or water without impeding their flow, and they are often exposed to corrosive salt and chemicals. An intrusion detection sensor that is intended to protect these openings must be capable of operating reliably under environmentally harsh conditions, and at the same time either provide a physical delay barrier or attach to an existing barrier. A new fiber optic sensor technology has now been developed specifically for protecting environmentally exposed openings. This sensor uses a fiber optic cable embedded in a neoprene rubber frame which is reinforced with Kevlar threads or braided steel cable. The sensor is configured in a mesh pattern with openings sufficiently large to permit air or water to flow unimpeded, ...
Non-destructive methods of diagnosis for detecting cable degradation by aging are being studied recently for improvement of electric wires and cables. This study examines degradation behaviors of cable sheath and insulation by combined accelerated aging tests applying thermal and radiation stresses simultaneously using a typical low voltage cable. According to experiments, elongation of cross-linked polyethylene insulation deteriorated at a faster rate than PVC sheath did under low doses below 50 Gy/h. Therefore, measurements using a time domain dielectric spectrometer (TDS) were carried out for the purpose of developing a method of degradation diagnosis of insulation. It was found that values of tan#delta# measured at very low frequencies below 0.1 Hz increase in pace with degradation of insulation reflecting the level of degradation more effectively than those measured at frequencies around the ...
This paper describes the safety gas management system utilizing public telephone cables. Buyo Gas Co., Ltd. has installed about 100 governors for exclusive-use or use in the districts to control the gas supply to the consumers. A gas safety management system has been developed. This system consists of a pressure sensor, the terminals of gas leak alarms, and their masters. The features lie in that the system can utilize public cables, is operative at interruption of power service, can correspond to emergency situations, serves to save the cost, and can display the data constantly. For electric facilities in a governor room and the NTT cable service work, sufficient agreement with the possessor is required. In the case of non-utility electric facilities, some restrictions are imposed on the cable work for laying from privately-owned transformers, etc. Insurance for the facilities is necessary to prepare ...
Flow Tex and ABB Energiekabel GmbH have developed a technique which allows the recovery of cables without requiring any trenching works. The new technique was successfully used for the first time for a pilot project in 1995. The authors report on two recent recovery projects (1998) in which an optimised technology was used for recovering a total of 1 500 m system length of 110 kV low-pressure oil-filled cables in Stuttgart and Munich on very different conditions. The authors describe the operational experiences with the cable connections and highlight the background stipulating the removal of the cables. (orig.) [Deutsch] Ein Verfahren zur grabungsfreien Bergung von Kabeln, gemeinsam entwickelt von FlowTex und ABB Energiekabel, wurde erstmals in einem Pilotprojekt 1995 mit Erfolg eingesetzt. Die Verfasser berichten ueber zwei Bergungsprojekte, bei denen 1998 mit der optimierten Technik in Stuttgart und ...
The microelectronic cable diagnosis is a substantial tool to determine destruction free the residual strength and the lifetime of laid PE/XLPE medium voltage cables. Fundamentals of the ageing diagnosis and a cost reduced inspection concept are the `Isothermal-Relaxation-Current` Analysis and the Neuro-Fuzzy evaluation software. These new tools are able to determine the ageing status of the investigated cable without any references. The authors also show that the test breakdown during the assessment of the ageing status of criterial systems can be reduced by this approach. The cable diagnosis equipment KDA is also useful for the steering of investment as well as for preventive maintenance. (orig.) [Deutsch] Die zerstoerungsfreie dielektrische Kabeldiagnostik kann heute einen wesentlichen Beitrag zur Bestimmung der Restfestigkeit und der Restlebensdauer eines PE/VPE-isolierten Mittelspannungskabels ...
Using electromatic field theory, a new method is developed for calculating alternating current in power cables installed in pipes of carbon steel (magnetic pipes). The technique for evaluating these losses is based on the method of images which replaces complicated distribution of currents in the system with a sequence of thin conductors. The method not only gives a mathematical framework for the solution of alternating current losses, but it also gives the underlying physical picture of effects contributing to these losses. Skin effect, proximity effect and losses due to the pipe are calculated separately. For the first time, the increase of losses in the conductors, when the cables are placed in a magetic pipe, are analyzed mathematically. Good agreement is obtained between the result of calculations and the experimentally determined ac-dc resistance ratios for pipe-type cables with concentric stranded copper conductors ...
The 220 kV Ch{bar u}si Trunk Line, now transmitting a maximum of 300 MW of electricity between the Ch{bar u}goku area of Honsh{bar u} and Shikoku island, is expected to be inadequate in the 1990's due to the rise in electrical demand. Therefore, to strengthen this interconnection, a new 500 kV transmission line was proposed. The most significant feature of this transmission line is the installation of 500 kV cables along the bridges (the Seto Ohashi Bridge) which span the Inland Sea (Seto). This is the first 500 kV long-distance transmission cable line. It is also the first large-scale cable line in the world installed along various types of bridges (ten bridges; route length of the bridge portion approximately 8 km). This paper gives an outline of the Honsh{bar u}---Shikoku interconnecting transmission line and also presents some technical features concerning 500 kV cables.
As a continuation of its efforts to provide methodologies and tools to Member States to carry out comparative assessment and analyse priority environmental issues related to the development of the electric power sector, the IAEA has completed a new version of the Wien Automatic System Planning (WASP) Package WASP-IV for carrying out power generation expansion planning taking into consideration fuel availability and environmental constraints. This manual constitutes a part of this work and aims to provide users with a guide to use effectively the new version of the model WASP-IV. WASP was originally developed in 1972 by the Tennessee Valley Authority and the Oak Ridge National Laboratory in the USA to meet the IAEA needs to analyse the economic competitiveness of nuclear power in comparison to other generation expansion alternatives for supplying the future electricity requirements of a country or region. Previous versions of the model were used by Member States in many national and ...
These classroom guides, designed to accompany the daily CNN (Cable News Network) Newsroom broadcasts for the month of October 2000, provide program rundowns, suggestions for class activities and discussion, student handouts, and a list of related news terms. Top stories include: Chinese authorities detain Falun Gong protesters on Tiananmen Square and Pope John Paul II angers China by canonizing Chinese martyrs, U.S. presidential candidates prepare for the first presidential debate, U.S. presidential candidates debate education issues, Danville, Kentucky prepares for the first U.S. vice presidential debate, and Yugoslav protesters seize parliament (October 2-6); Yugoslavian president Vojislav Kostunica takes office, recent clashes between Arabs and Israelis concern neighboring Arab states, North Korea observes 55 years of communism with celebrations, Al Gore and George W. Bush meet in the second presidential debate, and Violence in the Mideast ...
This executive summary presents an overview of the investigations, findings, conclusions, and recommendations of the Long Island Regional Planning Board (LIRPB) study of the Potential for Beneficial Use of Waste-to-Energy Facility Ash. The full report consists of the following volumes: Executive Summary; Volume 1: Long Island Ash Management Status; Volume 2: Sampling and Testing Procedures; Volume 3: Environmental Properties; Volume 4: Engineering Properties; Volume 5: Environmental Assessment; Volume 6: Engineering and Economic Evaluation; and Volume 7: Legal and Institutional Issues. Volumes one through seven are briefly summarized in this executive summary with the exception of Volume 2 of the report, which serves as the documentation of the sampling conditions and testing methods used in measuring chemical and physical properties of the ash tested. The study investigated the feasibility of the use of incinerator ash as ...
... P ) FERS 4 ... i 25. Opportunity for better fringe benefits 1 outside of the Federal Sector (eg, sick leave, _ annual leave, health or life insurance) .... ...
... 82 Ibid, 200. 83 Ibid, 200. 84 Ibid, 201. 43 Page 49. care to hunt down and execute all that claimed to be from the house of David. They considered ...
... laws between particles (modeling UGV/UAV/UUV collectives) to ... A mobile robot test-bed is used in ... of this work on mobile robots executing pursuit ...
This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.
Sep 5, 1996 ... In Haiti, the military deployed a space support team to advise the task force commander on the effective use of space assets, such as the Milstar ...
He said, I had heard of Cloud Computing when I was in grad school, but they had presentations on it at EclipseCon. I was sold that it was something that ...
allowed an initial assessment of ADS-33 handling quality requirements for an aircraft of this ...... then executing 180 or 360 degree turns in an attempt to ...
The Wendelstein 7-X (W7-X) modular stellarator is under construction at the Max-Planck-Institut fur Plasmaphysik in Greifswald, Germany. The W7-X magnet system contains 70 coils made up from helium cooled superconducting cables in aluminium alloy (EN AW-6063) jackets. Several hundred connections of the jacket to the cable joints are made by aluminium-to-aluminium welds. Due to geometrical and thermal boundary conditions these welds cannot be accomplished free from defects. Microscopic analyses of the welds show that a variety of small flaws such as cracks and pores develop during welding. The welds have thus to be dimensioned accordingly, and appropriate weld qualification, investigation and testing has to be done in order not to jeopardise the structural integrity and leak tightness. The ...
A new surveillance system for Oil-Filled cable, which can provide continuous monitoring, using a newly developed optical gas sensor that can detect the concentration of the gas dissolved in the oil with extremely high sensitivity has been developed. It was proved that the degree of deterioration of the insulating oil can be detected by measuring C{sub 2}H{sub 2} and CH{sub 4} by investigating the relation between the degree of deterioration and amount of combustible gas generated. In order to detect extremely small amounts of gas, a new gas detecting method using absorption line of the gas using a frequency modulated technique has been developed. The gas detection ability was also confirmed by examination using a 66 kV of cable and the possibility of detection at an early stage is expected.
The transmission of electrical energy by use of underground cables is increasing. Fault location techniques have certain limitations; incipient fault detection and location would help reduce the maintenance cost of these lines as well as improve the reliability of service. The report discusses some test results related to RF-probing techniques applied to high-voltage transmission lines. The high-frequency losses and attenuation in high-voltage cables places certain ultimate limitations on RF-probing techniques for incipient fault detection. Time-domain reflectrometry methods were employed to assess the RF-transmission properties of high-voltage cables at frequencies as high as 6 GHz. Fast-Fourier-transform deconvolution was used to obtain loss measurements as a function of frequency. The loss mechanisms were identified. The measurement hardware and methods are discussed as well as analysis approach leading to the ...
This report presents the results of an investigation into currently used methods for installation of underground high voltage power transmission cable, and offers recommendations for potentially improving these methods. Suggested enhancements cover the emplacement of both high pressure oil filled (HPOPT) pipe type and self contained oil filled (SCOF) cable systems. Cost comparisons of conventionally installed cable systems versus systems using proposed techniques and equipment are developed for a specific site selected for study. The report also documents the test results of laboratory experiments conducted to demonstrate the feasibility of using interference fit pipe couplings in place of welded pipe joints. 10 refs., 31 figs., 15 tabs.
Environmental compatibility is nowadays a very important part in the case of planing, construction, operation and maintainance of cable systems. A lot of laws and orders have to be observed. Some new aspects concerning the removal of oil filled cables and the consideration of electromagnetic fields even for cabels will be presented. (orig.) [Deutsch] Der Umweltschutz ist heute unverzichtbarer Bestandteil der Planung, Bau, Betrieb und Instandhaltung von Kabelanlagen. Zahlreiche Gesetze und Verordnungen sind hierbei zu beachten. Der Verfasser stellt einige Neuerungen im Zusammenhang mit dem Ausbau und Oelkabeln vor und erlaeutert die auch bei Kabeln zu beruecksichtigenden elektromagnetischen Felder. (orig.)
This paper reports on a flexible dimensionaly flush joint for 500kV aluminum-sheathed oil-filled cables capable of being assembled, pulled an installed in a similar manner to cables at site which has been developed. This joint is intended for use at intermediate points on long bridges or tunnels where local assembly and installation of conventional joints would be difficult. In developing the joint various novel and original techniques have been employed, including the flexible flush jointing of segmental conductors, the flexible jointing of paper insulation by a combination of wrapping-back and stepping methods, plus on-site aluminum sheath corrugating and sealing methods.
This article discusses the use of five-core cables to provide utility customers with the best possible prerequisites for trouble-free operation of electrical installations and equipment. The TN-S system in buildings and the new TN-S-five-core house-connection cable for connections between the mains distribution point and buildings is introduced. The long-term target of providing TN-S-systems in power distribution even as far as the local transformer is also discussed. The advantages of the system are discussed and various configurations for different types of supply are described.
The SRI International industrial team completed a subsystem and system parametric analysis, a 100-MW/sub e/ commercial plant conceptual design, a cost and performance analysis, and a commercial assessment. An executive summary is presented in this volume. (WHK)
Abstract The success of software projects is quite subjective in nature and is fettered by many risks, the perception of which varies from individual to individual and largely depends on the demographic characteristics of the executives and even the characteristics of the project. This study aims to identify and gauge the software risk dimensions and analyze the differences of perception among executives toward software risks. The contributions of this study untangle the issues underlying risks in the software industry and associates these issues with the perception of the -human- factor present in the industry.
An essential aspect of control centre design is the need to characterize: plant functions and their inter-relationships to support the achievement of operational goals, and roles for humans and automation in sharing and exchanging the execution of functions across all operational phases. Function analysis is a design activity that has been internationally accepted as an approach to satisfy this need. It is recognized as a fundamental and necessary component in the systematic approach to control centre design and is carried out early in the design process. A function analysis can provide a clear basis for: the control centre design for the purposes of design team communication, and customer or regulatory review, the control centre display and control systems, the staffing and layout requirements of the control centre, assessing the completeness of control centre displays and controls prior and supplementary to mock-up walkthroughs or simulator evaluations, and the ...
This document is a user`s manual for the Rn3D finite element code. Rn3D was developed to simulate gas flow and radon transport in variably saturated, nonisothermal porous media. The Rn3D model is applicable to a wide range of problems involving radon transport in soil because it can simulate either steady-state or transient flow and transport in one-, two- or three-dimensions (including radially symmetric two-dimensional problems). The porous materials may be heterogeneous and anisotropic. This manual describes all pertinent mathematics related to the governing, boundary, and constitutive equations of the model, as well as the development of the finite element equations used in the code. Instructions are given for constructing Rn3D input files and executing the code, as well as a description of all output files generated by the code. Five verification problems are given that test various aspects of code operation, complete with example input files, FORTRAN ...
This document is an executive summary of the colloquium organized by the French syndicate of renewable energies (SER) which took place at the Maison de l'UNESCO in Paris during the national debate on energies organized by the French government in spring 2003. The colloquium was organized around 6 round tables dealing with: the world perspectives and the environmental context of the contribution of renewable energies to the sustainable development (respect of Kyoto protocol commitments, contribution to the security of energy supplies, lack of large scale program of development of decentralized power generation in developing countries, lack of market tools linked with CO{sub 2} emissions, improvement of competitiveness); development of renewable energies in Europe (promotion and sustain in all European countries, obligation of supply and purchase, pricing regulation, European harmonization of practices); renewable electricity and its ...
The fundamental tasks of the Oak Ridge Y-12 Plant maintenance operations are planning, scheduling, executing, postmaintenance testing, completing the maintenance job, and supporting these activities with administrative and technical assistance. The Department of Energy (DOE) Maintenance Management Program'' guidelines require that we use a graded approach for applying formality and documentation to these maintenance operations. The most-rigorous controls should be placed on maintaining the most-vital systems, structures, and components (SSCs). We must understand risk assessments in order to evaluate which SSCs are most vital. The product of this assessment process is a well-developed understanding of where to apply the most rigor, formality, and documentation. Once we have determined where, we must determine how to apply maintenance so as to mitigate risk. Fundamental to determining how to apply it is an understanding of the ...
The DOETRAN model is a DSM database manager, developed to act as an intermediary between the whole building energy simulation model, DOE-2, and the DBEDT DSM Forecasting Model. DOETRAN accepts output data from DOE-2 and TRANslates that into the format required by the forecasting model. DOETRAN operates in the Windows environment and was developed using the relational database management software, Paradox 5.0 for Windows. It is not necessary to have any knowledge of Paradox to use DOETRAN. DOETRAN utilizes the powerful database manager capabilities of Paradox through a series of customized user-friendly windows displaying buttons and menus with simple and clear functions. The DOETRAN model performs three basic functions, with an optional fourth. The first function is to configure the user`s computer for DOETRAN. The second function is to import DOE-2 files with energy and loadshape data for each building type. The third main function is to then process the data into the forecasting ...
In FY-2000, Engineering at Lawrence Livermore National Laboratory faced significant pressures to meet critical project milestones, and immediate demands to facilitate the reassignment of employees as the National Ignition Facility (the 600-TW laser facility being designed and built at Livermore, and one of the largest R&D construction projects in the world) was in the process of re-baselining its plan while executing full-speed its technology development efforts. This drive for change occurred as an unprecedented level of management and program changes were occurring within LLNL. I am pleased to report that we met many key milestones and achieved numerous technological breakthroughs. This report summarizes our efforts to perform feasibility and reduce-to-practice studies, demonstrations, and/or techniques--as structured through our technology centers. Whether using computational engineering to predict how giant structures like ...
Network security is a discipline that focuses on securing networks from unauthorized access. Given the Escalating threats of malicious cyber attacks, modern enterprises employ multiple lines of defense. A comprehensive defense strategy against such attacks should include (I) an attack detection component that deter- mines the fact that a program is compromised, (2) an attack identification and prevention component that identifies attack packets so that one can block such packets in the future and prevents the attack from further propagation. Over the last decade, a significant amount of research has been vested in the systems that can detect cyber attacks either statically at compile time or dynamically at run time, However, not much effort is spent on automated attack packet identification or attack prevention. In this paper we present a unified solution to the problems mentioned above. We implemented this solution after the forward engineering of Open Source ...
The Berliner Kraft- u. Licht (BEWAG)AG have been conducting investigations during the last several years on a 110 kV low-pressure oil-filled high-power cable with a water cooled conductor and a load capacity of 950 MVA at 110 kV. After successful transport of the cable drums (weight: 16 metric tons; diameter: 4.9 m) from the manufacturing in Cologne, West Germany, to Berlin (West), and after laying of the cable over a 300 m stretch, the commissioning tests in accordance with IEC and VDE* standards have been concluded, and several loadings with a current of 5000 A have been performed. Now, after completion of various improvements in the test system, preparations are underway for initiation of long-term testing over a period of approx. 18 months.
This article addresses the connection of cogeneration plants to the utility system. The article provides examples for use in illustrating the problems that must be overcome and the solution chosen. These illustrations include high voltage utility connection, multiple connections to the utility at one location, and dealing with losses and obstructions.
Electric cars can be recharged via charging stations, battery exchange, or induction cable lanes in asphalted roads. The users' wishes remain unexplored, so a number of technologies are competing in this sector.
The report summarizes studies of ground, cable, and aerial logging systems in the Northern Rockies over a 15-year period. It provides nomographs and tables for calculating productivity and a system for comparing energy requirements.
The recent online publication of classified defense documents and diplomatic cables by the organization WikiLeaks and subsequent reporting by the New York Times and other news media have focused attention on whether such publication violates U.S. criminal...
The stand is designed to test supports of development workings. To expand the test range for various types of supports, the cross pieces have fixing devices in the form of winches interacting by cables through blocks fastened to the stand body with the support hinges.
The following topics are discussed: program goal and objectives, program organization, and program status. Current program projects are described. (MHR)
The Bioenergy Feedstock Development Program, Environmental Sciences Division, Oak Ridge National Laboratory is developing poplars (Populus species and hybrids) as sources of renewable energy, i.e., ethanol. Notable increases in adaptability, volume productivity, and pest/stress resistance have been achieved via classical selection and breeding and intensified cultural practices. Significant advances have also been made in the efficiencies of harvesting and handling systems. Given these and anticipated accomplishments, program leaders are considering shifting some attention to genetically modifying feedstock physical and chemical properties, so as to improve the efficiency with which feedstocks can be converted to ethanol. This report provides an in-depth review and synthesis of opportunities for and feasibilities of genetically modifying feedstock qualities via classical selection and breeding, marker-aided selection and breeding, and genetic ...
The studies undertaken by the B.C. Hydro company at the Canada showed that the existing system of hydroelectric power plants and transport cables will not be able to satisfy the increasing energy demand on the Vancouver island after 1985, and that the best solution will be the installation of a 525 kV transfer system from the continent. THe STK participated to the development and the immersion of this new system, the first in the world comprising submarine 525 kV transport parts. This paper presents the planning, the development, the submerging and the installation of two sections of submarine cable.
The major distributor and retailer of electrical power to Auckland, New Zealand, is Mercury Energy Limited. Following the sequential failure of the four 110kV underground cables, two gas-filled and two oil-filled, which supply the central business district, power was interrupted for 29 days from the 20th February 1998. A government inquiry was instituted, to examine what happened, why, and what lessons could be drawn for the future. Inadequacies in Mercury Energy`s cable maintenance and operating procedures were identified. The findings of the inquiry and its recommendations are reported. (UK)
A large number of fiber optic cables were used in support of a neutron imaging experiment at the Nevada Test Site. This paper describes the quality control testing of fiber components used on this experiment. The principal reason for quality control testing was to ensure reliable, high transmission fibers; a secondary reason was to gain data on a large sample of fiber cables in the field. Also described is the instrumentation developed for carrying out these field measurements. The design of the quality control instrumentation was a compromise between accuracy and simplicity of use.
An oil-immersion electrically insulated cable of high performance is constructed by wrapping a conductor with an insulating layer formed by winding on the conductor polypropylene film, and impregnating the insulating layer with an insulating oil preferably dodecyl benzene. The polypropylene film has a density in the range of 0.905 to 0.915 g/cm/sup 3/, birefringence in the range of 0.020 to 0.035, ratio of strengths in two axial directions (tensile strength in the longitudinal direction/tensile strength in the lateral direction) in the range of 5 to 15, and thickness in the range of 70 to 300 microns.
An empirical model of detonator electrical performance which describes the resistance of the exploding bridgewire (EBW) or exploding foil initiator (EFI or slapper) as a function of energy, deposition will be described. This model features many parameters that can be adjusted to obtain a close fit to experimental data. This has been demonstrated using recent experimental data taken with the cable discharge system located at Sandia National Laboratories. This paper will be a continuation of the paper entitled ``Cable Discharge System for Fundamental Detonator Studies`` presented at the 2nd NASA/DOD/DOE Pyrotechnic Workshop.
In this paper, we describes the research in condenser cone of SF{sub 6} gas sealing end for 345 kV oil-filled cable. The designed of condenser cone based on the results electric field analysis by electrostatics theory and FEM. As a results, we have been designed the condenser cone and the inner insulation part of SF{sub 6} sealing end, the width and length, the number of condenser, the length of stress relief slope, the total length of condenser cone. (author). 4 refs., 3 figs., 3 tabs.
A detailed description is given of the design, fabrication, and installation of oil-filled 500-kV cable lines used for the first time in the USSR for transmitting electric power from step-up transformers installed several meters from the hydroelectric generators to an outdoor distribution system or a junction point at which they are connected to overhead power transmission lines. These lines are 950 to 1050 m long and they are placed at levels differing by 45 m along the route. These lines can transmit power as great as 630 MV.A.
This report describes the results obtained during Stage 13 of a long-term research and development program concerning the development of diagnostics and monitoring methods for nuclear reactors. A brief proposal for the continuation of this program in Stage 14 is also given at the end of the report. The programexecuted in Stage 13 consists of three parts and the work performed in each part is summarized below. 1. Study of criticality, neutron kinetics and neutron noise in molten salt reactors (MSR). Although the original goal of the investigations of the MSR in Stage 13 was to calculate the neutron noise induced by the fluctuations of the fuel temperature, the study, solution and interpretation of the static problem, as well as to define an approximate version of the point kinetic approximation was necessary to perform. As it turned out, these tasks in themselves were more involved, and also very ...
The U.S. Department of Energy (DOE) and the U.S. Council for Automotive Research (composed of automakers Ford, General Motors, and Chrysler) announced in January 2002 a new cooperative research effort. Known as 'FreedomCAR' (derived from 'Freedom' and 'Cooperative Automotive Research'), it represents DOE's commitment to developing public/private partnerships to fund high-risk, high-payoff research into advanced automotive technologies. Efficient fuel cell technology, which uses hydrogen to power automobiles without air pollution, is a very promising pathway to achieving the ultimate vision. The new partnership replaces and builds upon the Partnership for a New Generation of Vehicles initiative that ran from 1993 through 2001. The Advanced Power Electronics and Electric Machines (APEEM) subprogram within the FreedomCAR and Vehicle Technologies Program provides support and guidance for many cutting-edge ...
In a three-phase tri-axial cable, the magnetic interaction between the phases makes the loss measurement by an electromagnetic method very complex. We developed the theoretical background showing that three-phase AC loss measurements by the electromagnetic method are, in principle, possible. We then implemented this theory in practical measurements on a 3 m long, tri-axial cable fabricated from RABiTS (rolling-assisted biaxially textured substrate) coated conductor. Initially, the proposed measurement technique was implemented in the simpler cases when the three cable phases are 180"0 out of phase, i.e. (0"0, 180"0, 360"0) or (0"0, 360"0, 180"0) rather than (0"0, 120"0, 240"0) as in a traditional three-phase system. For these cases, the currents in the phases are either in phase (360"0 phase difference) or anti-phase (180"0 phase difference). These are essentially single-phase measurements with only one transport current ...
With the fire accident in Browns Ferry nuclear power plant as a turning point, the regulation against fire has been strengthened more strictly as seen in the regulatory guide of the United States Nuclear Regulatory Commission. Fire of cables is caused by either the ignition of a cable itself or spread of fire to cables. The aspect of fire is divided into the local ignition and combution and the fire extension and prepagation because of the line-shaped configuration of cables. This report describes the prevention of the spread of fire. As the materials for the prevention of fire spread, fire spread-preventing paint ''Dannekka'', sealant ''Danseal P and L'', and fire prevention tape ''FD tape'' are reported, and the testing method and the results are described in detail. ''Dannekka'' is classified into the solvent dispersion type and the water dispersion type. It may be coated with brush or by spraying. ...
While underground power transmission lines have become to use CV cables as the mainstream, existing facilities still use OF cables. Factors of OF cable deterioration include heat cycles during operation and surge intrusion. As a method to diagnose this deterioration in insulation, characteristics tests are performed by collecting insulation oil in a cable connection box. The insulation oil collection work has been done conventionally with the power line stopped to prevent danger from induction voltage. A power uninterruptible oil collection tool was developed recently. The tool consists mainly of an insulator made of epoxy resin, wherein a connection box connector is rotated and loosened by operating an insulating operation rod, with the structure not contacted directly with metallic sheath, so that insulation oil can go through the oil collecting tool and gets collected. Discussions were given on the ...
The efficient design of computation intensive multidimensional signal processing applications requires dealing with three kinds of constraints: those implied by the data dependencies, the non-functional requirements (real-time, power consumption) and resources availability of the execution platform. Modeling and Analysis of Real-time and Embedded systems (MARTE) UML profile through its repetitive structure modeling (RSM) package is well suited to model the inherent parallelism within these applications, a compact representation of parallel execution platforms and the distributive mapping of one on another. The execution of such a specification respects the whole set of constraints defined upon, while the quality of the scheduling is directly linked to the quality of the mapping of the mult...
... 4. Military Working Dogs iMWDs). As used in this Instruction refers to drug detector dogs only. 5. Military Working Doq Executive Agent M(WJDEMA. ...
Mitochondria and peroxisomes execute some analogous, nonredundant functions including fatty acid oxidation and detoxification of reactive oxygen species, and, in response to select metabolic cues, undergo...Full Text Available
The paralysis-by-analysis phenomenon, i.e., attending to the execution of one's movement impairs performance, has gathered a lot of attention over recent years (see Wulf, 2007,...Full Text Available
Today, hospitals are involved extensively in social marketing and promotional activities. Recently, investigators from the Centers for Disease Control and Prevention (CDC) estimated that routine testing...Full Text Available
A brief overview of the conceptual design of a solar central receiver system integrated with an existing cogeneration facility is provided. A synopsis of the performance and economic evaluation, and an assessment of the concept from the site owner's perspective are given.
Individuals with major depressive disorder (MDD) often exhibit impaired executive function, particularly in experimental tasks that involve response conflict and require adaptive behavioral...Full Text Available
As the IC Information Sharing Executive (IC ISE), my main focus today concerns classified information--and, in particular, information that is derived from intelligence sources and methods, or information that is reflected in the analytic judgments and as...
In Lepidoptera, forewings and hindwings are mechanically coupled and flap in synchrony. Flight is anteromotoric, being driven primarily by action of the forewings. Here we report that lepidopterans...Full Text Available
The report summarizes the environmental significance of the priority pollutants being discharged from thirteen subcategories of the ore mining and dressing point source category. In addition, the impact of proposed effluent limitations guidelines is assessed from an environmental perspective.
disposal through HC, and the effects of kerbside collection (KC) of recyclable materials, by measuring ...waste equivalent to 12 % could be attributed to HC and KC.Comparisons between the residual weight data for ...Control showed that the contributions of HC and KC to the overall reduction in residual waste were
Accurate prediction of the pathogenic effects of specific genotypes is important for the design and execution of clinical trials as well as for meaningful counseling of individual patients. However,...Full Text Available
This report consists of an executive summary; eight sections dealing with various processes for coal liquefaction and research and development engineering services; and a glossary. An abstract was prepared for each of the eight sections. (EJH)
Recently, there have been multiple high-profile incidents involving the release of classified government information. Perhaps most prominent was Wikileaks.org's unauthorized publication of more than 600,000 classified Department of Defense documents. Such...
Feb 11, 1983 ... Kenmore cooktop stove, three. Saxophone, used only two years,. Executive wood desk, 36" x 72", minutes to NASA, $435/me. plus wagon, ...
When a certain void fraction value is reached in the two-phase flow regime, a problem occurs in the COBRA-EN code. This problem was observed in the drift-flux model option and interrupts code execution. Two solutions are proposed to solve the problem.
ADVANCED MODELING, S IMULATION, AND ANALYSIS (ROADMAP 14). ...... Metal/Silicon Extraction from Regolith & manufacturing ..... addresses solar power, energy storage (in conjunction with solar power and as a prime source of ...
The Wendelstein 7-X (W7-X) modular stellarator is under construction at the Max-Planck-Institut fuer Plasmaphysik in Greifswald, Germany. The W7-X magnet system contains 70 coils made up from helium cooled superconducting cables in aluminium alloy (EN AW-6063) jackets. Several hundred connections of the jacket to the cable joints are made by aluminium-to-aluminium welds. Due to geometrical and thermal boundary conditions these welds cannot be accomplished free from defects. Microscopic analyses of the welds show that a variety of small flaws such as cracks and pores develop during welding. The welds have thus to be dimensioned accordingly, and appropriate weld qualification, investigation and testing has to be done in order not to jeopardise the structural integrity and leak tightness. The weld is mechanically loaded during cool-down due to the difference in thermal contractions between the GRP insulation and the aluminium, and during operation ...
The Wendelstein 7-X (W7-X) modular stellarator is under construction at the Max-Planck-Institut fuer Plasmaphysik in Greifswald, Germany. The W7-X magnet system contains 70 coils made up from helium cooled superconducting cables in aluminium alloy (EN AW-6063) jackets. Several hundred connections of the jacket to the cable joints are made by aluminium-to-aluminium welds. Due to geometrical and thermal boundary conditions these welds cannot be accomplished free from defects. Microscopic analyses of the welds show that a variety of small flaws such as cracks and pores develop during welding. The welds have thus to be dimensioned accordingly, and appropriate weld qualification, investigation and testing has to be done in order not to jeopardise the structural integrity and leak tightness. The weld is mechanically loaded during cool-down due to the difference in thermal contractions between the GRP insulation and the aluminium, and during operation ...
and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Program Search Search Help Geothermal Technologies Program HOME ABOUT...
and Renewable Energy EERE Home | Programs & Offices | Consumer Information Geothermal Technologies Program Search Search Help Geothermal Technologies Program HOME ABOUT...
This executive summary presents the motivation, structure, objectives, methodologies and results of the first stage of the international DECOVALEX project - DECOVALEX I (1992-1995). The acronym stands for Development of Coupled Models and their Validation against Experiment in Nuclear Waste Isolation, and the project is an international effort to develop mathematical models, numerical methods and computer codes for coupled thermo-hydro-mechanical processes in fractured rocks and buffer materials for geological isolation of spent nuclear fuel and other radioactive wastes, and validate them against laboratory and field experiments. 24 refs.
Wind River Resources Corporation (WRRC) received a DOE grant in support of its proposal to acquire, process and interpret fifteen square miles of high-quality 3-D seismic data on non-allotted trust lands of the Uintah and Ouray (Ute) Indian Reservation, northeastern Utah, in 2000. Subsequent to receiving notice that its proposal would be funded, WRRC was able to add ten square miles of adjacent state and federal mineral acreage underlying tribal surface lands by arrangement with the operator of the Flat Rock Field. The twenty-five square mile 3-D seismic survey was conducted during the fall of 2000. The data were processed through the winter of 2000-2001, and initial interpretation took place during the spring of 2001. The initial interpretation identified multiple attractive drilling prospects, two of which were staked and permitted during the summer of 2001. The two initial wells were drilled in September and October of 2001. A deeper test was drilled in June of 2002. Subsequently a ...
This report covers the first year of operation of a fuel cell power plant, installed by PPL Spectrum, Inc. (PPL) under contract with the United States Coast Guard (USCG), Research and Development Center (RDC). The fuel cell was installed at Air Station Cape Cod in Bourne, MA. The project had the support of the Massachusetts Technology Collaborative (MTC), the Department of Energy (DOE), and Keyspan Energy. PPL selected FuelCell Energy, Inc. (FCE) and its fuel cell model DFC{reg_sign}300 for the contract. Grant contributions were finalized and a contract between PPL and the USCG for the manufacture, installation, and first year's maintenance of the fuel cell was executed on September 24, 2001. As the prime contractor, PPL was responsible for all facets of the project. All the work was completed by PPL through various subcontracts, including the primary subcontract with FCE for the manufacture, delivery, and installation of the fuel cell. The manufacturing ...
''S-220'' white oil is used currently to impregnate and fill high voltage cables for 110-500 kilovolts; it has high electrical characteristics and meets production and use standards. High pressure and cooling problems, however, require filling cables with lower viscosity oils, while insulation needs still demand high viscosity. The authors developed a new white oil similar to S-220 using a neutral oil made in producing sulfonate additives. The process involved vacuum distillation, low-temperature paraffination, sulfation with oleum, neutralizing with ammonium hydroxide and simultaneous extraction of sulfo-salts and contact purification. The lowest content of aromatic hydrocarbons was sought. Dielectric qualities varied with viscosity. Satisfactory thermooxidational capability was found at 50/sup 0/C with an oil of no less than 50 mm/sup 2//sec viscosity. The final white oil had no more than 2% aromatic ...
The danger potential for 110 kV cables, which are installed on racks and in tunnels, caused by catching fire because of arcing short circuits and mechanical overstressing by peak shortcircuit current, has been experimental analysed under Bewag network conditions. As a result, recommendations for an improved installation of 110 kV cables are given. (orig.) [Deutsch] Fuer offen gelegte 110-kV-Kabel in Raeumen, auf Fussboeden und in Schaechten wurde das von Kurzschluessen auf den Kabeln ausgehende Gefaehrdungspotential fuer die Entstehung von Kabelbraenden durch Fehlerlichtboegen und fuer eine mechanische Ueberbeanspruchung von Kabeln durch Stosskurzschlussstroeme unter Beruecksichtigung der Netzverhaeltnisse der Bewag experimentell untersucht. Im Ergebnis geben die Verfasser Empfehlungen fuer die sichere Anordnung offen gelegter 110-kV-Kabel. (orig.)
This report describes a study to evaluate methods for locating leaks of dielectric fluid from buried high-voltage cable systems. Two primary types of leak location systems were investigated: (1) systems that will rapidly isolate the leak within a manhole section, typically 1000-m long on a feeder that might be 30-km long; and (2) systems that will then pinpoint the location of the leak. Rapid leak isolation was accomplished by developing an enhanced conductivity oil probe which allows the injection of a small quantity of conductive oil and which indicates the path of the oil as it drifts downstream in the direction of the leak. Two methods for pinpointing the leak were proven. The more successful method was the use of trained leak location dogs which were found to have far better sensitivity than instruments and which could detect cable oil alone without the need for additives. A tracer gas injection and detection scheme was developed for use ...
Development and deployment of small-scale nuclear power reactors and their maintenance, monitoring, and control are part of the mission under the Small Modular Reactor (SMR) program. The objectives of this NERI-consortium research project are to investigate, develop, and validate advanced methods for sensing, controlling, monitoring, diagnosis, and prognosis of these reactors, and to demonstrate the methods with application to one of the proposed integral pressurized water reactors (IPWR). For this project, the IPWR design by Westinghouse, the International Reactor Secure and Innovative (IRIS), has been used to demonstrate the techniques developed under this project. The research focuses on three topical areas with the following objectives. Objective 1 - Develop and apply simulation capabilities and sensitivity/uncertainty analysis methods to address sensor deployment analysis and small grid stability issues. Objective 2 - Develop and test an autonomous and ...
Bags of explosive are loaded rapidly into deep wellbores by suspending a rigid positioning tube partway into the wellbore, and loading the bags into the tube, the bags being prevented from dropping through the open bottom end of the tube by a cord attached to the lowermost bag and secured at the upper end of the tube when the tube-suspending cable is in tension by a cordsecuring/releasing means, E.G., a pivotable bar having a hook on one end. When the bag-laden tube is lowered to the bottom of the wellbore, or to a column of bags previously placed therein, the tension on the cable is relaxed and the cord is released, allowing the positioning tube thereafter to be raised to the surface for re-use, leaving the cord and bags in the wellbore. Freedom of the bag-supporting cord to move with respect to the positioning tube when the latter is raised to the surface is assured by threading the cord through plastic tubing mounted to the wall of the ...
This invention pertains to a light weight underground pipe or cable installing device adapted for use in a narrow and deep operating trench. More particularly this underground pipe installing device employs a pair of laterally movable gates positioned adjacent the bottom of the operating trench where the earth is more solid to securely clamp the device in the operating trench to enable it to withstand the forces exerted as the actuating rod is forced through the earth from the so-called operating trench to the target trench. To accommodate the laterally movable gates positioned adjacent the bottom of the narrow pipe installing device, a pair of top operated double-acting rod clamping jaws, operated by a hydraulic cylinder positioned above the actuating rod are employed.
The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.
The Reactor Head Structure Assembly(RHSA) is the structure located on the reactor assembly. The purpose of the assembly is providing interface location for cables, preventing pipe whips, prohibiting instruments from becoming missiles, and restraining CEDMs' horizontal motion. On the RHSA, Reactor Disconnect Panels(RDP) are installed. The installation location of RDP is to be decided to minimize the geometric interface with other components. Since the neighborhood of RHSA is crowded due to many connectors and cables, it is necessary to find the good design of RHSA to make an intricate situation attenuated and the required function maintained. The geometric shape and overall configuration of RHSA are determined by axiomatic design approach. The FRs of RHSA are specified and the corresponding DPs are found to satisfy FRs in sequence. The finite element analysis is carried out based on the result of the axiomatic design to evaluate the ...
Research programs from the following sections and programs are summarized: aquatic ecology, environmental resources, earth sciences, terrestrial ecology, advanced fossil energy program, toxic substances program, environmental impacts program, biomass, low-level waste research and development program, US DOE low-level waste management program, and waste isolation program.
Program plans of the Office of Coal Technology in coal liquefaction are presented. Technology description, status, market applications, program strategy and program management descriptions are included. 2 figs. (CBS)
S-120 white oils are used to impregnate insulation and fill high voltage wires. Cooling oil flows of specified viscosities can increase the load capacity of wires. White oils are studied for viscosities and dielectric properties. To meet requirements, S-220 type oils of different medium or low viscosities are tested. Capacity can be increased by viscosity adjustment. Tests were also made to select optimum stabilizing additives to keep low-viscosity.
Several materials, lenses, dry bearings and cables were exposed to a tritiated moisture environment to study the behavior of tritium contamination on candidate materials for ITER remote handling equipment. To optimize the tritium removal procedure, decontamination experiments using a gas purge with three different moisture concentrations were also performed. The surface tritium concentrations of CeO{sub 2} containing alkaline barium glass (NB), CeO{sub 2} containing lead glass (LX) and synthetic quartz (Quartz) after the exposure experiments were 7.80, 10.94 and 0.67 Bq/cm{sup 2}, respectively. It was found that the tritium concentration was influenced by the compositions of the materials. The concentrations of tritium on type 831 (solid lubrication material: graphite) and type 237 (solid lubrication material: tungsten disulfate) dry bearings after the exposure experiments were 89.80 and 31.78 Bq/cm{sup 2}, respectively. The tritium concentration in an electric ...
Several materials, lenses, dry bearings and cables were exposed to a tritiated moisture environment to study the behavior of tritium contamination on candidate materials for ITER remote handling equipment. To optimize the tritium removal procedure, decontamination experiments using a gas purge with three different moisture concentrations were also performed. The surface tritium concentrations of CeO_2 containing alkaline barium glass (NB), CeO_2 containing lead glass (LX) and synthetic quartz (Quartz) after the exposure experiments were 7.80, 10.94 and 0.67 Bq/cm"2, respectively. It was found that the tritium concentration was influenced by the compositions of the materials. The concentrations of tritium on type 831 (solid lubrication material: graphite) and type 237 (solid lubrication material: tungsten disulfate) dry bearings after the exposure experiments were 89.80 and 31.78 Bq/cm"2, respectively. The tritium concentration in an electric ...
A brief article gives an update on the commercial exploitation of superconductivity by the American Superconductor Corporation. Potential applications include transmission and distribution, motors, magnetic storage systems, current limiters and transport. The company have produced a kilometre long, ''wrappable'' cable capable of carrying thousands of amps when operating at a temperature of below -140[sup o]C. (UK)
For the first time a segmented n-type HPGe detector was operated directly submerged in liquid nitrogen over a long period. As this kind of detector is envisioned to be used in GERDA phase II, it was operated with a low mass signal cable with snap-contacts and mounted in a low-mass copper holder. The detector performance was stable over 146 days, indicating that neither detector nor contacts deteriorated.
Processes were developed that use lasers as manufacturing tools. These processes were stripping of insulation from cables and wires, machining of quartz, microdrilling and welding of reflective metals, and precision alignment of curved surfaces before machining. A technological basis also was formed which resulted in a process for automatic surface inspection of parts and aided development of machining processes for Kevlar parts.
These documents defines the interconnection France-England rules for the 2000 MW DC submarine cable directly linking the transmission networks of England and Wales and France. Rights to use Interconnector capacity from 1 April 2001 are to be offered through competitive tenders and auctions, full details of which are set out in the Rules. The contract and a guide to the application form are provided. (A.L.B.)
A length of metal sheathed metal oxide cable is perforated to permit liquid access to the insulation about a pair of conductors spaced close to one another. Changes in resistance across the conductors will be a function of liquid level, since the wetted insulation will have greater electrical conductivity than that of the dry insulation above the liquid elevation.
By way of introduction, the author describes the electrical equipment of the power station on the River Traun and then lists the main features of the electrical systems such as generators, transformers, the power transmission systems as, e.g., the generator leads, the 8 kV switch plant, the 110 kV oil-filled cable as well as the station-service, control, protection and monitoring systems. The control of the headwater level and of the mechanical systems of the barrage is described in detail.
The device is made by a tool at the end of a flexible cable, a motor for the rotation of the flexible, a linear drive with a guide for it between the winder and the tube.
The design of a 345-kV prefabricated capacitive-graded joint for oil-filled cables and the manufacture and testing of prototype joints are described. Tests on prototype No. 4 demonstrated the adequacy of the printed circuit design. It was not possible to consistently obtain high-quality capacitive sheets and substantial effort is required to remedy this problem. Advantages of these prefabricated joints are summarized, and specific recommendations are made for further development of the concept.
Corona from bare conductors of electrical overhead power lines is studied in this article. Its origin, as well as, its bad influences over communication systems are both studied, yet. Line`s models are defined, in order to be able the examination of Corona on line`s cables. Formulas for the surface electrical gradient calculations are shown. (author) 2 refs.
In cold countries, the design of transmission lines and communication networks requires the knowledge of ice loads on conductors. Atmospheric icing is a stochastic phenomenon and therefore probabilistic design is used more and more for structure icing analysis. For strength and reliability assessments, a data base on atmospheric icing is needed to characterize the distributions of ice load and corresponding meteorological parameters. A test site where icing is frequent is used to obtain field data on atmospheric icing. This test site is located on the Mt. Valin, near Chicoutimi, Quebec, Canada. The experimental installation is mainly composed of various instrumented but non-energized test cables, meteorological instruments, a data acquisition system, and a video recorder. Several types of icing events can produce large ice accretions dangerous for land-based structures. They are rime due to in-cloud icing, glaze caused by freezing rain, wet snow, and mixtures of ...
Helical dipole magnets are required in a project for the Relativistic Heavy Ion Collider (RHIC) to control and preserve the beam polarization in order to allow the collision of polarized proton beams. Specifications are for low current superconducting magnets with a 100 mm coil aperture and a 4 Tesla field in which the field rotates 360 degrees over a distance of 2.4 meters. A magnet meeting the requirements has been developed that uses a small diameter cable wound into helical grooves machined into a thick-walled aluminum cylinder.
The hurried development of multimedia and internet allows for wide distribution of digital media data. It becomes much easier to edit, modify and duplicate digital information. In additional, digital document is also easy to copy and distribute, therefore it may face many threats. It became necessary to find an appropriate protection due to the significance, accuracy and sensitivity of the information. Furthermore, there is no formal method to be followed to discover a hidden data. In this paper, a new information hiding framework is presented.The proposed framework aim is implementation of framework computation between advance encryption standard (AES) and distortion technique (DT) which embeds information in image page within executable file (EXE file) to find a secure solution to cover file without change the size of cover file. The framework includes two main functions; first is the hiding of the information in the image page of EXE file, through the ...
BackgroundThe WINPEPI computer programs for epidemiologists are designed for use in practice and research in the health field and as learning or teaching aids. The programs are free,...Full Text Available
We present interactive computer programs for the analysis of nucleic acid sequences. In order to handle these programs, minimum computer experience is sufficient. The nucleotide sequence of the human...Full Text Available
... Materials Development Program TECHNOLOGY EDUCATION INSTRUCTIONAL MATERIALS Elementary - High School ... of technology education materials through its Instructional Materials Development (IMD) program. The ...
Efficiency and Renewable Energy EERE Home | Programs & Offices | Consumer Information Chemicals Search Search Help Chemicals EERE » Industrial Technologies Program » Chemicals...
The need for a Combustion and Melting Research Facility focused on the solution of glass manufacturing problems common to all segments of the glass industry was given high priority in the earliest version of the Glass Industry Technology Roadmap (Eisenhauer et al., 1997). Visteon Glass Systems and, later, PPG Industries proposed to meet this requirement, in partnership with the DOE/OIT Glass Program and Sandia National Laboratories, by designing and building a research furnace equipped with state-of-the-art diagnostics in the DOE Combustion Research Facility located at the Sandia site in Livermore, CA. Input on the configuration and objectives of the facility was sought from the entire industry by a variety of routes: (1) through a survey distributed to industry leaders by GMIC, (2) by conducting an open workshop following the OIT Glass Industry Project Review in September 1999, (3) from discussions with numerous glass engineers, scientists, and ...
The Real-Time Specification for Java (RTSJ) is silent on multiprocessor issues. It attempts not to preclude multiprocessor implementations but provides no direct support. Many areas of the RTSJ leave an implementation considerable freedom on how it provides the defined functionality. One such area is the asynchronous event handling (AEH) model. Events are fired and associated handlers are scheduled for execution in response; handlers have defined scheduling parameters and deadlines. The primary goal of the AEH model is to support a lightweight real-time concurrency model. Hence handlers, in general, do not have dedicated threads. Rather, the implementation is responsible for ensuring that all handlers meet their deadlines. Typically real-time threads are assigned to execute handlers by the...
Background:- Children with oppositional defiant disorder/conduct disorder (ODD/CD) have shown deficits in -cool- abstract-cognitive, and -hot- reward-related executive function (EF) tasks. However, it is currently unclear to what extent ODD/CD is associated with neuropsychological deficits, independently of attention deficit hyperactivity disorder (ADHD). Methods:- Fifty-nine adolescents with a history of early-onset oppositional problems, 28 with pure ODD/CD symptoms and 31 with ADHD with or without ODD/CD, and 34 healthy controls were administered a task battery measuring motor response inhibition, sustained attention, cognitive flexibility and reward-related decision-making. Findings were analysed using dimensional and group analyses. Results:- In group analyses both groups with and wit...
Objective:To create the International Spinal Cord Injury (SCI) Male Sexual Function Basic Data Set within the International SCI Data Sets.Setting:An international working group.Methods:The draft of the data set was developed by an international working group consisting of members appointed by the International Spinal Cord Society (ISCoS), the American Spinal Injury Association (ASIA) and a representative from the executive committee of the International SCI Standards and Data Sets. The data set was developed in an iterative process with review and comments by the members of the executive committee of the International SCI Standards and Data Sets, ISCoS scientific committee, ASIA Board and the ISCoS Council, as well as all the interested organizations and individuals. Next, the data set was...
The Procurement and Assistance Data System (PADS) provides a mechanism for collecting, assembling, organizing, and presenting acquisition and assistance data for the Department of Energy (DOE). This handbook and associated documents establish a uniform system to report acquisition/assistance data to PADS for the collection, processing, and dissemination of official statistical data on the Department's acquisition and assistance actions. The data provides, based on information available at the time of request, a basis for any recurring and special reports to the senior procurement executive, Congress, General Accounting Office (GAO), Federal executive agencies, Office of Management and Budget (OMB), and the general public. PADS is also used to satisfy DOE's statutory reporting requirements to the Office of Management Budget, Congress, and other Federal agencies. Accurate and timely collection of PR data is a key element in this ...
The MAP model was introduced in information system engineering in order to model processes on a flexible way. The intentional level of this model helps an engineer to execute a process with a strong relationship to the situation of the project at hand. In the literature, attempts for having a practical use of maps are not numerous. Our aim is to enhance the guidance mechanisms of the process execution by reusing graph algorithms. After clarifying the existing relationship between graphs and maps, we improve the MAP model by adding qualitative criteria. We then offer a way to express maps with graphs and propose to use Graph theory algorithms to offer an automatic guidance of the map. We illustrate our proposal by an example and discuss its limitations.
Since 1998, The Pennsylvania State University successfully managed the Consortium for Premium Carbon Products from Coal (CPCPC), which was a vehicle for industry-driven research on the promotion, development, and transfer of innovative technologies on premium carbon products from coal to the U.S. industry. The CPCPC was an initiative led by Penn State, its cocharter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provided the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350. This agreement ended November 2004 but the CPCPC activity continued under cooperative agreement No. DE-FC26-03NT41874, which started October 1, 2003 and ended December 31, 2010. The objective of the second agreement was to continue the successful operation of the CPCPC. The CPCPC enjoyed ...
At the end of 2005, Robert D. Felner was riding high. A well-paid dean at the University of Louisville, he had just secured a $694,000 earmarked grant from the U.S. Department of Education to create an elaborate research center to help Kentucky's public schools. The grant proposal, which Mr. Felner had labored over for months, made some impressive promises. On paper this all seemed plausible: From 1996 until 2003, Mr. Felner directed the University of Rhode Island's education school, where he helped create a well-regarded statewide research center. To put it gently, Mr. Felner did not duplicate that feat at Louisville. By the spring of 2008, all but $96,000 of the grant had been spent, but none of the tasks listed in Mr. Felner's proposal had been accomplished. Late in May 2008, he told his colleagues that he had been hired as chancellor of the University of Wisconsin-Parkside, effective August 1. During his final weeks at Louisville, Mr. Felner pressed his luck one last time. Even ...
Progress is reported in fabrication and coating activities being conducted for the weapons program, nuclear test program, nuclear design program, magnetic fusion program, and miscellaneous applications. (DLC)
Keywords: energy, management, conservation, program, fiscal, year, 2005, annual, ...S Environmental Protection Agency Energy Management and Conservation Program ...ENVIRONMENTAL P ROTECTION AGENCY Energy Management and Conservation Program Fiscal Year 2005 Annual Report
... is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP ...
Because of variations in tRNA sequences in evolution, tRNA synthetases either do not acylate their cognate tRNAs from other organisms or execute misacylations which can be deleterious in vivo. We report...Full Text Available
The effect on an oscillator moving in a medium produced by that part of the radiative force which does not perform work but creates and angular moment is considered. It is shown that the radiative torque turns the dipole toward the axis along which it is moving. Near the axis of motion the dipole executes small oscilltions. The frequency of the oscillations is determined. This effect leads to spontaneous alignment of the dipole moments on moving through the medium. The feasibility of observing the effect experimentally is discussed.
This guide describes the simulator`s governing equations, constitutive functions and numerical solution algorithms of the STOMP (Subsurface Transport Over Multiple Phases) simulator, a scientific tool for analyzing multiple phase subsurface flow and transport. The STOMP simulator`s fundamental purpose is to produce numerical predictions of thermal and hydrologic flow and transport phenomena in variably saturated subsurface environments, which are contaminated with volatile or nonvolatile organic compounds. Auxiliary applications include numerical predictions of solute transport processes including radioactive chain decay processes. In writing these guides for the STOMP simulator, the authors have assumed that the reader comprehends concepts and theories associated with multiple-phase hydrology, heat transfer, thermodynamics, radioactive chain decay, and nonhysteretic relative permeability, saturation-capillary pressure constitutive functions. The authors further assume that the reader ...
Executive summaryForewordPublic awareness of solid-state chemistry, or more broadly solid-state science and technology rapidly grew along with the transistor revolution and the development of the integrated circuit. We are now at the half-way point in the solid state century [Scientific American The Solid-State Century 1997;8(1) [special issue
The paper deals with the disposal of radioactive waste and the plans for dealing with solid wastes of intermediate and low levels of activity, which are the responsibility of NIREX. NIREX is an executive body which co-ordinates the waste-disposal plans of the main radioactive waste producers. The disposal routes for the active wastes are described including the deep disposal of wastes containing material that will remain active for thousands of years. Requirements for deep burial are outlined with reference to the geology and hydrogeology of the site. Monitoring, maintenance and surveillance are mentioned for the protection of the public.
The image processing system for the dynamic neutron radiography has been developed. It is based on the hardware subset, composed by the method of the pipe-line and use of algorithm of local statistics. The processing speed per one pixel is shorter than 100 n sec and video-rate processing can be executed on it. Some image processes for improving the quality of the real-time neutron image, noise reduction and contrast stretching would be attempted by the use of this system. (author).
"Network Physics, the only provider of physics-based network management products, today announced an additional venture round of $6 million in funding, as well as the addition of David Jones as president and CEO and Tom Dunn as vice president of sales and business development" (1 page).
The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.
Daya Bay Nuclear Power Station is the largest joint-venture project which is also the largest commercial nuclear power plant currently under construction in China mainland. Organized and executed strictly in accordance with international standards, the Daya Bay project is seen as the first step taken by China in the development programme of large-capacity commercial nuclear power units.
In November 1998, President Clinton charged the National Bioethics Advisory Commission with the task of conducting a thorough review of the issues associated with human stem cell research, balancing all ethical and medical considerations. The President's ...
Contains Executive Summary and Chapters on: Energy and the Internet; Internet Developments; Search Guide; Oil and Gas Industry; Electricity and Utilities; Nuclear Energy; Coal Industry; Alternative Energy; Government and Supranational Agencies; Research Institutions and Universities; Energy Statistics; Commodity Pricing and financial Markets; Company Information; Country Information; Associations; Engineering; Environment; Patents, Trademarks and Standards; News; Industry Events; Miscellaneous. (Author)
Table of Contents: Executive Summary; Introduction; Data Sources; Industry Profile and Economic Baseline; Industry Compliance Costs; Industry Impacts; Additional Economic Impacts; Cost-Effectiveness; Environmental Impacts and Benefits; Social Costs and Be...
According to the practice operation experience of the outdoors electrical equipment in Guangdong Daya Bay Nuclear Power Station, following to the engineering technical standard applied in China, by analysis and assessment of pollution classes, it is considered that the class four is reasonable. And indicated the voltage distance should be more than 3.5 cm/kV. Some improvements had been executed and effects are good. And further suggest some improving comments
The human causal factors for all human error licensing operational events on Daya Bay nuclear power station since 1993 to 2003 are categorized, the trend of these causal factors is analyzed. The emphasis is placed on analyzing the deficiencies on complying with and executing regulations and procedures. The results provide directional reference for nuclear power station to improve human performance. (author)
Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.
The purpose is to provide a source of information that can be used to assist personnel in the planning, training, and execution of radiological work using the principles of ALARA. This document is not intended to replace HNF or WHC Control Manual requirements. The ALARA Tools-List provides detailed information on the use and procurement of engineered controls, mockup training guidelines, and good radiological work practices that have been proven to be ALARA.
This is an executive summary of a final subcontract report that describes the successful completion of a closed-loop demonstration of a regenerative thermoelectromechanical device using solar heat input for the production of electricity. The full report, which contains a detailed description of the two-year effort, is currently subject to a government secrecy order which precludes public release of the information. Copies of the full report will be made available for general release whenever the secrecy order is lifted.
Full text: The ITWG was first formed in 1995 for the purpose of fostering international cooperation for combating illicit trafficking of nuclear materials. The initial focus for the ITWG was on the development of nuclear forensics to help answer attribution questions regarding nuclear materials of unknown origin. More recently, the ITWG has also expanded its focus to include detection of nuclear materials during transit. This paper presents some of the key developments by this group and their potential impact for combating nuclear smuggling. The initial focus of the ITWG was to write a status report on international cooperation on nuclear smuggling forensic analysis. This 26-page report summarized previous work on nuclear forensics and gave an initial analysis on prioritizing techniques and methods for forensic analysis regarding source and route attribution. This report was submitted to the G-8 countries, and shortly thereafter, nuclear forensics was endorsed at the Moscow Summit in ...
A series of line fault tests have been conducted at completion of Stage I of the Hokkaido-Honshu HVDC Link of Electric Power Development Co., Ltd., prior to its commercial operation, in order to study transient overvoltages and overcurrents and to confirm safety operation of system protecting devices in case of DC transmission line faults. The Hokkaido-Honshu HVDC Link is a metallic return HVDC overhead line and cable transmission system, currently being a monopolar system. For this, measurements were conducted this time on reverse polarity overvoltages occurring on main line cable, return line overvoltages, fault arc dynamic characteristics, and DC bypass current through the AC system. The results obtained were then compared with the analysis results by the HVDC surge similator or digital simulation conducted for system design prior to the field tests. As a result, a close accordance was found between them, in confirmation of the effectiveness ...
Full text. Here we present a status report of the Schenberg antenna, which started commissioning runs in September 2006 under the full support of FAPESP. In its first commissioning runs we tested three preliminary parametric transducer systems, which did not achieve a high enough performance for placing the antenna sensitivity in the range of the calibrator capacitor. Instead of improving the calibrator, making it capable of introducing a larger input force, we decided to go to a radical upgrading operation: replacing the three transducers for a complete set of six transducers, with better sensitivity and arranged according to the truncated icosahedron configuration, plus two extra ones; starting to install the dilution refrigerator; installing wires, cables, and amplifiers for the complete set of transducer circuits; and a new suspension and vibration isolation system for the cabling and microstrip antennas. We also have been developing a new ...
The Wind Energy Research Division of Sandia National Laboratories has been funded by the Wind/Ocean Technology Division of the Department of Energy (DOE) to design and build a 34-meter diameter Vertical Axis Wind Turbine (VAWT). The turbine design incorporates the results of recent VAWT research in aerodynamics and structural dynamics. Initial system concept studies identified several blade options that met the required power rating of 500 kW. The final blade and rotor configurations were chosen based on finite element calculations that determined the turbine modes of response, their frequency of vibration, and stress levels. For parked survival turbine components were designed to with stand the loading of a 150 mph (67.0 m/s) wind coupled with maximum cable tensions. Specific areas of design discussed include the rotor, cables, bearings, brakes, and foundations. Construction of the turbine is in progress at this time and anticipated completion ...
The main LHC superconducting magnets (dipoles and quadrupoles) use Rutherford type cables, stabilized electrically and thermally with copper profiles. The portions of cables are connected to each other by a soft soldering technique (Sn96Ag4) with an overlapping length corresponding to one pitch of the superconducting strands. The splice constitutes a "composite" structure with the interchanging layers of Sn96Ag4 and NbTi superconductor, located inside a Cu cage. In order to ensure a high level of reliability (failure probability not exceeding 10-8) for some 10000 connections in the LHC, a non-destructive technique to check the quantity of solder in the joint is foreseen. The technique is based on a gamma ray source (241Am) and the detection is position-sensitive in the transmission mode. Scintillating detectors of gamma rays are used and their accumulated length corresponds to the length of the radioactive source (120 mm). The method can be ...
Axial strain characterization was completed for a Nb{sub 3}Sn conductor from Lawrence Livermore National Lab used in a transverse stress test of a cable-in-conduit conductor. The effect of axial strain on the critical current of the LLNL Nb{sub 3}Sn test strand was measured at magnetic fields from 8 T to 22 T. The conductor specifications are shown in Table 3, and the measured data are shown in Table 4. The data are presented graphically in Figs. 5 through 7. The I{sub c} and J{sub c} values are based on an electric field criterion (E{sub c}) of 2 {mu}V/cm. The zero-strain 12 T value of J{sub c} at 12 T was 0.39 GA/m{sup 2}. The irreversible strain limit was quite high, 1.0 strain, and the compressive prestrain was relatively low at 0.27%. Fracture strain was 1.10%.
Radiation-and-thermal-combined degradation of some kinds of cable insulating and jacketing materials was evaluated by accelerated aging tests. Plasticized polyvinyl chloride (PVC), silicone rubber, crosslinked and non-crosslinked halogen-free flame-retardant polyolefins (NH-XLPO and NH-PO) and ethylene-propylene rubber (EP rubber) of experimental formulation were degraded at accelerated rates, that are 50-1000 times the degradation rate under standard conditions (e.g.; 1Gy/h, 50degC), and a method to assess the lifetime of these materials under standard conditions was studied. The degradation was investigated by measuring tensile properties. In the accelerated aging tests, rates of elongation decrease owing to degradation for these materials were in proportion to the increase in accelerated rate. The PVC lifetime estimated from sequential aging tests had a tendency to extend beyond that from simultaneous aging tests, while the lifetime of other materials estimated ...
Radiation-and-thermal-combined degradation of ethylene-propylene rubber (EP rubber) and chlorosulfonated polyethylene (CSM) as cable insulating and jacketing materials were evaluated by accelerated aging tests and a method to assess the lifetime of these materials under practical application was studied. EP rubber and CSM of experimental formulation were degraded at accelerated rates, that are 50 [approx] 1000 times the degradation rate under a standard condition (1Gy/h, 50degC). The degradation was investigated by measuring the tensile properties. In the accelerated aging tests, rates of elongation decrease owing to degradation for both EP rubber and CSM were in proportion to increase in accelerated rate. Behaviors of elongation changes showed little difference with accelerated rate. EP rubber lifetime estimated from sequential aging test had a tendency to extend beyond that from simultaneous aging test, while CSM lifetime estimated from both aging tests were ...
Radiation-and-thermal-combined degradation of ethylene-propylene rubber (EP rubber) and chlorosulfonated polyethylene (CSM) as cable insulating and jacketing materials were evaluated by accelerated aging tests and a method to assess the lifetime of these materials under practical application was studied. EP rubber and CSM of experimental formulation were degraded at accelerated rates, that are 50 #approx# 1000 times the degradation rate under a standard condition (1Gy/h, 50degC). The degradation was investigated by measuring the tensile properties. In the accelerated aging tests, rates of elongation decrease owing to degradation for both EP rubber and CSM were in proportion to increase in accelerated rate. Behaviors of elongation changes showed little difference with accelerated rate. EP rubber lifetime estimated from sequential aging test had a tendency to extend beyond that from simultaneous aging test, while CSM lifetime estimated from both aging tests were ...
The effects of various antioxidants and antioxidant concentrations on the radiation and thermal stability of EPDM and XLPE polymers used for insulation of electric cable in nuclear power plants were measured. The objective was to determine if particular antioxidants could be identified as being especially effective for stabilization against radiation aging and combined thermal and radiation aging. Elongation to rupture was used as the measure of stability. Materials were irradiated to doses up to 2 MGy (200 Mrad) at a dose rate of 200 to 300 Gy/h in the Cobalt-60 Gamma Irradiation Facility at the University of Virginia. All of the antioxidants tested, which were known to provide excellent thermal stability, also provided good stability for radiation aging and combined thermal/radiation aging, although small differences between antioxidants were noted. No antioxidant or antioxidant combination was identified as being especially outstanding. Stabilization against ...
Drums is an acronym for Dynamic Rating and Underground Monitoring System, with specific application to high-pressure pipe-type cable systems which are the predominant means of underground electric power transmission in the United States. The primary objective of this EPRI-sponsored feasibility study was to establish the technical feasibility of seven DRUMS functions and two novel DRUMS communication schemes. The seven DRUMS functions which monitor the system's vital and measurable parameters in real time and perform system diagnostics in the event of component deterioration, malfunction or failure are: Real Time Current Monitoring and Rating; Leak Detection and Location; Fault Location; Pothead Monitoring; Oil Monitoring; Pipe Protection; and Splice Monitoring. The two DRUMS communication schemes are internal to the pipe cable system. Mechanical Communication will use pressure pulses to transmit data along the system, while the ...
Aerial lines or cables, as one mainly energy transport path of electronic system when illuminated by HEMP, has been often modeled by field-to-transmission line model. However, in many cases, authors too often encounter some confusing statements to the lines effects during experimental procedure. The aim of this paper is to present and discuss these cases, such as the electromagnetic environment above the ground plane, the contribution of the different electromagnetic field component to the induced current and voltage, variations of the load current for different line heights and ground conductivities etc. (authors)
This article gives a survey of the history, properties and applications of 'Kevlar' aramide fibers. For example, the 'Kevlar' para-aramide fiber is used in compound materials in ship-, aircraft- and vehicle construction. 'Kevlar' is used as a replacement for asbestos, for example in brakes, clutches and seals or as rubber reinforcement (tyres, conveyor belts, hoses). The aramide fibers also offer manufacturers of ropes, hawsers and cables a near ideal range of properties. (MM).
The production of many important commercial materials involves the evolution of a complex fluid through a cooling phase into a hardened product. Textile fibers, high-strength fibers(KEVLAR, VECTRAN), plastics, chopped-fiber compounds, and fiber optical cable are such materials. Industry desires to replace experiments with on-line, real time models of these processes. Solutions to the problems are not just a matter of technology transfer, but require a fundamental description and simulation of the processes. Goals of the project are to develop models that can be used to optimize macroscopic properties of the solid product, to identify sources of undesirable defects, and to seek boundary-temperature and flow-and-material controls to optimize desired properties.
We have used scale models to measure the predicted coupling of electromagnetic fields simulating the effects of high-altitude nuclear electromagnetic pulses (HEMP) on the interior surfaces of electronic components. Predictive tools for exterior coupling are adequate. For interior coupling, however, such tools are in their infancy. Our methodological approach combines analytical, computational, and laboratory techniques in a complementary way to take advantage of their separate strengths. Computer models are a promising tool, as they can be used to treat complex objects with arbitrary shapes, dielectrics, and cables, and multiple apertures. Laboratory tests can expand the domain of investigation even further.
The purpose of a FAAT analysis is to estimate the probability of system upset to an electromagnetic threat, for systems on which we have incomplete information. As an example of this process, we will discuss the response of part of a telephone repeater system to wideband transients. We first estimate the currents induced on above-ground and buried cables. After that, we describe the simple circuit we used to build a model of the amplifier and protective devices. Finally, we describe the scaling of the energy deposited in the electronics, including its nonlinear large-signal response, with the amplitude of the wideband waveforms.
The baseline design for the SSC High Energy Booster (HEB) has dipole bending magnets with a 50 mm aperture. An analysis of the cryogenic heat load due to A.C. losses generated in the HEB ramp cycle are reported for this magnet. Included in this analysis are losses from superconductor hysteresis, yoke hysteresis, strand eddy currents, and cable eddy currents. The A.C. loss impact of 2.5 {mu}m vs. 6 {mu}m filament conductor is presented. A 60 mm aperture design is also investigated. 8 refs., 3 tabs.
The HVDC link across the English Channel, which was brought into service in 1986, has several innovative features. Techniques used in its construction together with recent developments have consolidated the viability of HVDC links for a variety of applications. Outlines the main features of the scheme, including the benefits of interconnecting the British and French 400 kV AC power systems; integration of the UK converter system to the 400 kV AC grid; the DC submarine cables; convertor equipment (particularly the UK installation); and future HVDC developments. 6 refs.
Probabilistic assessment methods can be used to identify specific plant vulnerabilities. Application of such methods can also facilitate selection among system design alternatives available for safety enhancements. The quality of assessment results is however strongly dependent on realistic and accurate input data for modelling of system component behaviour and failure modes during conditions to be assessed. Use of conservative input data may not lead to results providing guidance on safety upgrades. Adequate input data for probabilistic assessments seems to be lacking for at least failure modes of some electrical components when exposed to a fire. This report presents an attempt to improve the situation with respect to such input data. In order to take advantage of information in existing documentation of fire incident occurrences some of the lessons learned from the fire at Browns Ferry Nuclear Power Plant on March 22, 1975 are discussed in this report. Also a summary of results from ...
Long duration investigations on XLPE-insulated, medium-voltage cable have been intensively carried out by producers, institutes and users for decades. These tests have concentrated on cable ageing especially under the influence of water. About six years ago, a standard test procedure was developed based on comprehensive know-how. This test procedure is now included in DIN VDE 0276-620. In the following text, experience gained during testing and while performing tests in numerous laboratories is reported, and a summary of the test results is given. (orig.) [Deutsch] Langzeituntersuchungen an VPE-isolierten Mittelspannungskabeln, die sich mit der Alterung der Kabel, besonders unter dem Einfluss von Wasser beschaeftigen, wurden seit Jahrzehnten durch Hersteller, Institute und Anwender intensiv betrieben. Basierend auf diesem sehr umfangreichen Know-how wurde vor rd. sechs Jahren ein standardisiertes Pruefverfahren entwickelt, das heute Bestandteil ...
In spite of recent education reform and reorganization efforts requiring the use of research-based methods, the fundamental elements of an effective program for children and youth with emotional and behavioral disorders (EBD) have not been succinctly identified. This article presents the essential features of programs for students with EBD. Program elements include (a) qualified and committed professionals, (b) utilitarian environmental supports, (c) effective behavior management plans, (d) valid social skill and social interpretation training and social interaction programs, (e) proven academic support systems, (f) strong parent- and family-involvement programs, (g) coordinated community support mechanisms, and (h) ongoing evaluation of essential program components and student outcomes and progress. A justification for the program and a ...
China’s methadone maintenance treatment program was initiated in 2004 as a small pilot project in just eight sites. It has since expanded into a nationwide program encompassing more than 680...Full Text Available
This paper examines the current military working dogs (MWD) program, its historical roots, and the possibility for expansion of the program. Current service MWD programs will be discussed, as well as possible models for change. The primary focus is on the...
A computer program, RISK-XLR, which calculates genetic risk for carrier status of a Mendelian X-linked recessive condition has been written for the Macintosh series of microcomputers. The program,...Full Text Available
... POSITION VACANT: Program Manager (Advance Materials and Manufacturing), AD-340-4. Salary ranges from ... POTENTIAL: Program Manager (Advanced Materials and Manufacturing), AD-340-4. LOCATION: Directorate ...
This paper evaluates the Post-Hospital Support Program for the frail elderly and their caregivers using a quasi-experimental design. The program goals were to reduce stress in the caregivers, improve...Full Text Available
Describes the light construction curriculum offered at Carteret Technical College, NC, in terms of course offerings, program finances, problems, and the establishment of tax-exempt endowment corporation through which the program was funded. Concludes with suggestions for organizing a construction program. (AYC)
This project reflected cooperation across the disciplines in the physical sciences, engineering, mathematics and computer science. The University of the Pacific served as the center for this pre-college program. The idea was to use this link as a pilot program.
Title: FY 2004 Energy Management and Conservation Program Annual Report ...Energy Management and Conservation Program ...Environmental Protection Agency Office of Administration and Resources Management 1200 Pennsylvania Avenue, NW (3101A)
This report discusses the work done on EPRI program S149-1. In this program the feasibility of cleaning steam generators off line with organic chelants as a means of arresting denting corrosion was investigated. The rationale behind this program is to mak...
In most previous studies of topology optimization, commercial programs, such as Optistruct, ANSYS, and MSC Patran, usually were used during implementation. Such commercial programs are not easy to use and entail time and cost. In addition, it is difficult to confirm results with reference to individual stages of optimization. For addressing this disadvantage, a topology optimization program, which is based on the C language, is developed in this study. This is a very convenient and powerful program for users to conduct topology optimization by using all density methods and homogenization methods in compliance with the methodology. For verifying the developed program, first of all, topology optimization was implemented by using density methods to evaluate the strain energy density of a cant...
The present article describes the features of the fully-fired combined cycles and the outline of the plant. Hitachi has optimized fully-fired combined cycle systems by executing a heat recovery type combined cycle. For the fully-fired combined cycles, it is possible to raise plant efficiency through the selection of adequate gas turbine types and cycles. It is possible to apply existing boiler facilities, fuel combustion systems, and stacks. It is possible to execute civil and architectural works on existing plants in-service as well as modification works during routine inspections. The NOx increment by gas turbine unit installations can be reduced by denitration plant modifications. Examples of the fully-fired combined cycles under planning are also introduced. Furthermore, the relational technique and operational characteristics are mentioned, as for combustion characteristics under low oxygen concentration in the wind box, NOx emissions on ...
Over the five year period of performance, thirteen task assignments were issued by the DOE to ARINC Research. During the two year base period seven tasks were assigned. Two task assignments were issued for each of the three consecutive one year option periods. Associated with all task assignments were multiple subtasks, some of which required significant effort. These subtasks are appropriately cited in this report under their respective task assignments as principal work activities or deliverables. The technical and management support provided to the DOE under this contract focused on two general areas: (1) appraisal activities and (2) non-appraisal activities. Support to appraisals included planning, document review, developing lines-of-inquiry, interviewing, data collection, report writing, and follow-up. Such work was executed both on-site at the DOE facility under review and off-site. Non-appraisal support was varied and included such areas as document review, ...
As a parameter for execution control of confirming a bearing stratum, which is most important in a bored precast pile method, discussions were made on the relativity between the product AT'' of a load current value A'' in an electric motor driving an auger used to drill pit holes with an excavation time T'' and a value N,'' a result of the standard penetration test of the ground. As a result, although the relativity of the N'' value has some variance in the ground of diluvial clay, they correspond well to each other in other kinds of ground. In pile bearing strata in particular, they correspond very well to each other regardless of soil textures of the ground, proving clearly that the AT'' value can be used as an effective parameter for confirmation of and penetration into the bearing stratum. Therefore, tips of all the piles used in one construction site can ...
JRR-3 is a research reactor of 10 MWt output, which attained the criticality in 1962. All the design, manufacture, installation and others of this reactor were carried out by Japanese technologies, except the fuel and heavy water as the moderator and coolant, therefore it is nicknamed Home-made No.1 Reactor. Recently, due to the change in the state of utilizing research reactors and the rise of quality in the utilization, JRR-3 has become to be unable to meet sufficiently the needs of users. The plan of reconstructing the JRR-3 was considered under such situation, and in order to reuse the reactor building, the reactor proper is removed, and an entirely new, high performance, versatile reactor is to be constructed. In this paper, as to the removal works of the JRR-3 reactor proper, the method of execution, design, the execution of works and so on are outlined. The removal works of the reactor facilities were started in February, 1986. The ...
The review of the practical, internal implementation of the rules shows that the Federal Republic of Germany is provided with instruments which are flexible enough to fulfill her duties relating to international law, and to ensure the internal applicatibility of these rules. The simplified implementary methods, especially empowering the executive to put certain rules into force which have been modified or re-issued by international organizations and commissions promises that - internally - these rules will become effective quickly. The switch-over of law-making to the executive is appreciated with regard to the special features of subjects relating to technical rules, and with regard to the necessity of their prompt adaptation to changing circumstances and to respectively existing scientific knowledge. Reproaching the international community of states with complete failure in the field of international environmental protection does not seem to ...
Substation machinery foundation works have some features such as a number of work cases second look cases in design, and so forth. The Tohoku Electric Power Co., Inc. started the development of a system generally supporting the substation machinery foundation design to practical use the Engineering Work Station (EWS) introduced to the civil engineering department as a part of improvement of management efficiency. At first, rigid foundation design support system (TRAD) and slab foundation design support system (KANSAS-IN) automatically conductible with from preparation of design and amount calculation sheet to preparation of design drawing was developed, which was began to operate since March of 1996. As a result, the rigid foundation design became able to execute fully automatic works from preparation of design and its drawing to amount calculation. And, on the slab foundation design, three dimensional FEM analysis could be executed for shorter ...
This paper discusses the restructure of the Milstar communication satellite program. The resulting system is substantially streamlined, and will provide better utilization by tactical forces without compromising strategic nuclear communications requirements.
This program deals with solid waste disposal with topics/services covering: Reusable Building Materials and Large Household Items Exchange, Beneficial Use Determination, Biosolids, Certification, Compost Facil...
The Directive establishes a single manager for the Department of Defense Military Working Dog Program, provides policy, prescribes procedures, and assigns responsibilities.
... Instrumentation for Materials Research (IMR) Division of Materials Research Synopsis of Program ... for Materials Research (IMR) program in the Division of Materials Research (DMR) is designed to ...
Program Plans, Implementation, & Results Energy Management at Federal Facilities Energy Management at DOE Fleet Management Interagency Coordination Interagency Energy...
This document is the annual update of the FFTF and Advanced Reactors Transition Program Resource Loaded Schedule for FY 2002 using current project direction and authorized funding levels
... grants to adopt or adapt courses and materials developed by CCD projects at other institutions, and ... to adopt or adapt CCD-developed courses and materials. -iv- Accomplishments The CCD program has ...
Recommendations of the Advisory Committee on Reactor Safeguards are presented to the Commissioners for their consideration for FY 82 budget for the NRC safety research program.
Recommendations of the Advisory Committee on Reactor Safeguards are presented to the Commissioners for their consideration for FY 83 budget for the NRC safety research program.
magnet research at several national laboratories through its Advanced Accelerator Technology Program. The HEP Conductor Development Program, a collaboration among national...
All sections of the third edition of this well-known textbook have been revised and enlarged in consequence of the change-over to SI units. Numerous examples and illustrations have been included or replaced by new ones. The book considers the latest research results as well as the constructive developments of industrial steam turbine construction. On a scientific basis, this plain book imparts basic knowledge of the design, calculation, execution, condensation and performance in service of steam turbines of all types. The well-founded introduction, together with many calculated examples addresses the student as well as the engineer.
The LHC is designed to provide proton beams of 7 TeV and nominal luminosity of 10**34 cm**-2s**-1. This objective is achieved at an affordable cost by pushing all major collider components to the limits of technology, by upgrading the existing CERN accelerators and infrastructure, and by involving the technical expertise, resources and dedication of accelerator laboratories world-wide. Following a decade of intensive R&D and technical validation of major collider systems, the LHC construction is now fully underway. Major industrial contracts have been awarded and are in execution for the procurement of the magnet, cryogenics and other systems. In this report, the status of the design and construction of the major LHC systems is presented.
Previous AIX development environment experience with ASC White and Early Delivery systems UV and UM was leveraged to provide a smooth and robust transition to the Purple development environment. Still, there were three major changes that initially caused serious problems for Purple users. The first was making 64-bit builds of executables the default instead of 32-bit. The second was requiring all executables to use large page memory. The third was the phase-out of the popular, but now defunct, third-party C++ compiler KCC, which required the migration of many codes to IBM's xlC C++ compiler. On Purple, the default build environment changed from 32-bit builds to 64-bit builds in order to enable executables to use the 4GB per processor (32GB per node) memory available, and in order for the MPI library to do collective optimizations that required the larger 64-bit address space. The 64-bit build environment was made ...
Faced with a changing business emphasis, plus the need to reduce operations and maintenance costs in the North Sea, the Forties Field engineering partnership between BP and Brown and Root recognised the need to make radical changes in its organisational structure. An innovative change management programme was planned and executed inside 12 months with the purpose of right-sizing the Forties Operations Engineering team. Not only has the initiative succeeded in cutting costs by 40 per cent; it has also enhanced the quality of engineering support services supplied to the BP Forties platforms. (author)
In this paper, probabilistic safety assessment (PSA) of the station blackout (SBO) and 5th emergency diesel in Daya Bay NPP has been carried out, the calculation method of non-recover factors of power supplies is given, and sensitivity analysis on the connection duration of 5th emergency diesel has been executed. It is concluded that the core damage frequency (CDF) induced by SBO is relatively large, the addition of 5th emergency diesel is very helpful for the CDF reduction, and the connection duration of this diesel has great effect on the CDF reduction
This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.
Three-dimensional magnetohydrodynamic simulations are executed in a full toroidal geometry to clarify the physical mechanisms of the Internal Reconnection Event (IRE), which is observed in the spherical tokamak experiments. The simulation results reproduce several main properties of IRE. Comparison between the numerical results and experimental observation indicates fairly good agreements regarding nonlinear behavior, such as appearance of localized helical distortion, appearance of characteristic conical shape in the pressure profile during thermal quench, and subsequent appearance of the m=2/n=1 type helical distortion of the torus. (author)
Multiphase flow calculation software and computer-readable media carrying computer executable instructions for calculating liquid and gas phase mass flow rates of high void fraction multiphase flows. The multiphase flow calculation software employs various given, or experimentally determined, parameters in conjunction with a plurality of pressure differentials of a multiphase flow, preferably supplied by a differential pressure flowmeter or the like, to determine liquid and gas phase mass flow rates of the high void fraction multiphase flows. Embodiments of the multiphase flow calculation software are suitable for use in a variety of applications, including real-time management and control of an object system.
This dissertation deals with membrane gas absorption in the application of CO{sub 2} removal by aqueous alkanolamines, using microporous PTFE hollow fiber membranes. A new lab-scale apparatus was constructed and an extensive experimental study executed to determine the performance of the membrane gas absorber, with aqueous solutions of monoethanolamine (MEA) and methyldiethanolamine (MDEA) as absorbents. The important operation parameters CO{sub 2} partial pressure, gas velocity, liquid velocity, temperature and liquid CO{sub 2} loading were systematically varied within the range typically experienced in a process for exhaust gas CO{sub 2}-removal
The method of syndrome coding for data compression read out from multiwire proportional chambers that has been previously proposed is generalized in case of its application to registration of the coordinates of events detected. The questions of execution of arithmetic and algebraic operations on the Galois field elements and their hardware implementation are considered. The method of computation is presented of a specialized processor for parallel computing the coordinates of three sparks. The estimate of its speed is equal to 185 ns. Data compression, data selection and coordinate calculations are performed without use of memory elements and timing pulses.
The insertion of innovative technologies to replace baseline technologies used in cost estimation and planning of DOE D&D projects is considered a high risk endeavor by project and programmatic decision makers. It is almost always considered safer to go with the {open_quotes}devil you know{close_quotes} than use a new or untried technology, methodology or system. The decision on the specific technology to be utilized to remediate a problem is often made months or years in advance of execution, and the highly proscriptive documentation of agreements necessary to obtain stakeholder and regulator approval of remedial plans is often counterproductive to considering improved technologies.
Jim Rogers, president and chief executive officer of Duke Energy Corporation, examines how coal and climate change regulations can co-exist. He addresses the need for economically sound choices for future energy needs, which is complicated by what he refers to as 'the elephant in the room'climate change. He observes that new CO{sub 2} regulations would increase the USA's cost of generating electricity over time and result in higher prices for customers, and he advocates that a gradual, economy-wide, market-based U.S. climate policy is the best option. 1 ref., 1 fig.
Ubiquitous computing based on small mobile devices using wireless communication links is becoming very attractive. The computational power and storage capacities provided allow the execution of sophisticated applications. Due to the fact that sharing of information is a central problem for distributed applications, the development of self organizing middleware services providing high level interfaces for information managing is essential. ADS is a directory service for mobile ad-hoc networks dealing with local and nearby information as well as providing access to distant information. The approach discussed throughout this paper is based upon the concept of information markets.
This paper describes a search algorithm to locate values of t where the real part of the Riemann zeta function, zeta(sigma+it), is negative for sigma>1. The run-time to execute the search is much less than a brute-force approach and relies on certain symmetries of congruence equations related to the zeta function. Initial results show the smallest value of t where this begins to occur is much nearer to the real axis than conservative estimates would suggest.
The Internet is becoming the preferred method for disseminating scientific data from a variety of disciplines. This can result in information overload on the part of the scientists, who are unable to query all of the relevant sources, even if they knew where to find them, what they contained, how to interact with them, and how to interpret the results. A related issue is keeping up with current trends in information technology often taxes the end-user's expertise and time. Thus instead of benefiting from this information rich environment, scientists become experts on a small number of sources and technologies, use them almost exclusively, and develop a resistance to innovations that can enhance their productivity. Enabling information based scientific advances, in domains such as functional genomics, requires fully utilizing all available information and the latest technologies. In order to address this problem we are developing a end-user centric, domain-sensitive ...
Highly intelligent, confident, and successful, alpha males represent about 70% of all senior executives. Natural leaders, they willingly take on levels of responsibility most rational people would find overwhelming. But many of their quintessential strengths can also make alphas difficult to work with. Their self-confidence can appear domineering. Their high expectations can make them excessively critical. Their unemotional style can keep them from inspiring their teams. That's why alphas need coaching to broaden their interpersonal tool kits while preserving their strengths. Drawing from their experience coaching more than 1,000 senior executives, the authors outline an approach tailored specifically for the alpha. Coaches get the alpha's attention by inundating him with data from 360-degree feedback presented in ways he will find compelling--both hard-boiled metrics and vivid verbatim comments from colleagues about his strengths and ...
This document defines the quality assurance program requirements for the US Department of Energy, Richland Field Office, Environmental Restoration program at the Hanford Site. This document integrates quality assurance requirements from US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order, and applicable industry standards into a single source document for the development of quality assurance programs applicable to the Environmental Restoration program items and activities. This document has been configured into three parts and fifteen criteria to provide user organizations with a workable document that best facilitates line operations. When developing individual user organization quality assurance programs, the document configuration provides each organization with the Flexibility to incorporate only those parts and criteria that are applicable ...
The flow of current inside a conductor leads to its overheating. This conductor is also submitted to other climatic phenomena, such as wind, sun light and ambient temperature. The knowledge of this overheating is important to ensure a functioning temperature compatible with the materials used for the conductor manufacturing and with the dip of overhead power lines above the ground and buildings. On the other hand, according to the Laplace works, the flow of current inside parallel conductors induces electromagnetic forces inside them, proportional to the product of currents in both conductors. In the case of short-circuit between aerial power lines or between flexible cables, electrodynamical stresses (traction and flexion) are applied to insulators and holders and important swinging of the lines can be observed. These stresses can be extremely important and must be considered in the design of overhead lines. These two phenomena are analyzed in this chapter. (J.S.)
A miniature x-ray source utilizing a hot filament cathode. The source has a millimeter scale size and is capable of producing broad spectrum x-ray emission over a wide range of x-ray energies. The miniature source consists of a compact vacuum tube assembly containing the hot filament cathode, an anode, a high voltage feedthru for delivering high voltage to the cathode, a getter for maintaining high vacuum, a connector for initial vacuum pump down and crimp-off, and a high voltage connection for attaching a compact high voltage cable to the high voltage feedthru. At least a portion of the vacuum tube wall is fabricated from highly x-ray transparent materials, such as sapphire, diamond, or boron nitride.
In both office and home environments, Ethernet represents the dominant networking technology in use. Ethernet is low cost and the networks are fairly understood by users. The author began by explaining the physical and data link layers of Ethernet, then touched on fibre-optic cables. The industrial protocols were discussed, followed by Ethernet network topology. The environmental robustness of Ethernet networks was reviewed, with a word of caution from the author, advising to properly evaluate whether Ethernet represents a mission-critical component of the substation, as substation control houses are not environmentally controlled spaces, often minimally heated and no cooling. Engineering access to station Integrated Electric Drives (IEDs). By properly connecting Ethernet networks, it is possible to access relays in the substations from desktop engineering workstations in the central office. Network security issues must be addressed to prevent unauthorized access ...
A dielectric-wall linear accelerator is improved by a high-voltage, fast rise-time switch that includes a pair of electrodes between which are laminated alternating layers of isolated conductors and insulators. A high voltage is placed between the electrodes sufficient to stress the voltage breakdown of the insulator on command. A light trigger, such as a laser, is focused along at least one line along the edge surface of the laminated alternating layers of isolated conductors and insulators extending between the electrodes. The laser is energized to initiate a surface breakdown by a fluence of photons, thus causing the electrical switch to close very promptly. Such insulators and lasers are incorporated in a dielectric wall linear accelerator with Blumlein modules, and phasing is controlled by adjusting the length of fiber optic cables that carry the laser light to the insulator surface.
A dielectric-wall linear accelerator is improved by a high-voltage, fast rise-time switch that includes a pair of electrodes between which are laminated alternating layers of isolated conductors and insulators. A high voltage is placed between the electrodes sufficient to stress the voltage breakdown of the insulator on command. A light trigger, such as a laser, is focused along at least one line along the edge surface of the laminated alternating layers of isolated conductors and insulators extending between the electrodes. The laser is energized to initiate a surface breakdown by a fluence of photons, thus causing the electrical switch to close very promptly. Such insulators and lasers are incorporated in a dielectric wall linear accelerator with Blumlein modules, and phasing is controlled by adjusting the length of fiber optic cables that carry the laser light to the insulator surface. 12 figs.
A UPS based on a line-interactive system for CATV (Cable TV) networks has been newly developed. An inverter of the UPS featuring a pure sine wave output and equipped with an uninterrupptible transfer switch made it possible to raise its reliability high and to reduce the uninterruptible transfer time from 50 {approx} 100 ms to only 3 ms. The expected life of 15 years and maintenance-free of the UPS were realized by monitoring and optimizing the operational conditions of lead-acid batteries, aluminum electrolytic capacitors and cooling fans. The use of rust- and weather- resistant painting methods for an outer box of the UPS also contributed to extend the life of the system. (author)
Concrete is the primary material for building envelopes in some parts of the world, and its ability to store heat as well as its dynamic temperature changes will not only affect the deterioration rate of the exterior wall but will also greatly influence the energy efficiency of interior air conditioning. There are many methods for measuring the inner temperature of concrete, but they often have limitations, such as indirect estimation, cable installation requirements, high cost, or heterogeneity of the sample structure. In order to measure the internal temperature of concrete, this study integrated a Radio Frequency Integrated Circuit (RFIC) with a temperature sensor chip and embedded the device in concrete structures. A Smart Temperature Information Material (STIM) was thus developed. Thi...
One of the requirements for uniform field quality in the SSC dipole magnets is the consistency in the superconducting strand characteristics from start to finish to the production phase. As full scale production of strand and cable approaches, the consistency in performance of the early batches of conductor needs to be examined. A number of 300 mm billets have been manufactured at IGC with tight process controls. The performance of the final conductor in terms of piece lengths, current density, Cu/Sc ratio and wire diameter has been evaluated. The data are analyzed in order to understand the variations that are related to the conductor design and processing. In this paper the current density of the strand is examined over the length of the billet to determine inherent variability in the Nb/Ti alloy itself.
The flexible, insulated, single strand cables are electrically connected with a cylindrical polar tip (PN) by means of cylindrical and conical shafts for the polar tips, which enter the faces of the divided, multiwire strand, clamped by tension half couplings. The flat ends of the polar tips being joined are positioned in two concentric mandrel bushings, an internal fixed one and an external, axially movable bushing (PV). The internal bushing is rigidly attached to the end of the left polar tip and equipped with three or four rounded, radial openings, whose diameter is determined by the external diameter of the locking device hinges (ShF) of the connecting couplings. The right polar tip is equipped with an annular channel of trapezoidal section into which the locking device hinges enter. The external movable bushing on the right side has a conical turning and on the left, a cylindrical into which the cylindrical spring which holds the movable bushing in the extreme ...
Energy Related Inventions Program Number 613 was a two year program to commercialize a unique new wear material, Metal Reinforced Carbon Composite, MRCC. The program was designed to manufacture sample components of MRCC for evaluation by potential users and manufacturers. As a result of the program Burton Technologies Inc. and Rotary Power International are forming a joint company to manufacture, market and license MRCC materials to a wide range of industries.
The results for development of methods and computer programs for integrated optimization of parameters of perspective fast reactors are given. The possibilities of the program for the reactor campaign calculation are analysed. This program is based on utilisation of the Bubnov-Galerkin method and Wigner disturbance theory. The possibility of application of approximation methods for the optimization researches is discussed. The results of development of the programs for complex reactor computations with account of control rods system and change of physical parameters in the reactor campaign are discussed. (author).
This report summarizes the Groundwater Monitoring Program conducted by SRS during third quarter 1998. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official record of the analytical results.
This report summarizes the Groundwater Monitoring Program conducted by the Savannah River site during fourth quarter 1999. It includes the analytical data, field data, data review, quality control, and other documentation for this program; provides a record of the program's activities; and serves as an official records of the analytical results.
Vibration of machinery plays an important role in preventive maintenance programs of machinery. It can be applied in different phases ranging from simple to computerized programs. The advantages of applying machine condition monitoring programs are numerous since vibration measurement and analysis leads to the early detection of component deterioration. The cost, savings and some details of the vibration preventive maintenance program are discussed.
The US DOE`s Photovoltaics program has helped photovoltaic technologies evolve from materials and concepts in the laboratories to competitive products rolling off automated assembly lines. This document is divided into the following sections: 1992 PV program accomplishments, expanding markets for photovoltaic systems, developing today`s systems with utilities and industry, working with industry to advance the technology, cooperative research to improve materials and devices, selected achievements in cooperative R and D, and PV program services. Figs, tabs.
This manual is a guide to the services provided by the Hanford Internal Dosimetry Program (IDP), which is operated by the Pacific Northwest National Laboratory.( ) for the U.S. Department of Energy Richland Operations Office, Office of River Protection and their Hanford Site contractors. The manual describes the roles of and relationships between the IDP and the radiation protection programs of the Hanford Site contractors. Recommendations and guidance are also provided for consideration in implementing bioassay monitoring and internal dosimetry elements of radiation protection programs.
The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.
The comments are divided into three parts. Section 2 relates generally to programs for which greater effort or emphasis is needed. Section 3 provides specific comments on the proposed programs in each Decision Unit and, in most cases, for individual Subelements within each Decision Unit. Specific recommendations regarding the Research Program Support Budget are given in Section 4.
This program is designed in order to calculate electricity generation cost by different energy sources, and menu type is adopted for user convenience. This program also graphically shows the share of capital investment cost, O and M cost, and fuel cost. Sensitivity analysis about discount rate can also be carried out by this program, taking into consideration the important role of the discount rate in the generation costs calculation. (Author) 7 refs., 1 fig., 3 tabs.
The United State Domestic Research Reactor Infrastructure Program at the Idaho National Laboratory manages and provides project management, technical, quality engineering, quality inspection and nuclear material support for the United States Department of Energy sponsored University Reactor Fuels Program. This program provides fresh, unirradiated nuclear fuel to Domestic University Research Reactor Facilities and is responsible for the return of the DOE-owned, irradiated nuclear fuel over the life of the program. This presentation will introduce the program management team, the universities supported by the program, the status of the program and focus on the return process of irradiated nuclear fuel for long term storage at DOE managed receipt facilities. It will include lessons learned from research reactor facilities that have successfully ...
This document establishes the Quality Assurance (QA) Program requirements for the Hazards Waste remedial Actions Program (HASWRAP) for ensuring, with a high degree of confidence, that program objectives will be achieved as planned. The QA Program is introduced in Sect. 1. The HAZWRAP Support Contractor Office (SCO) functional organization and QA responsibilities are shown in Sect. 2. QA program requirements are contained in Sect. 3. These requiremens are pased on the American national Standard, American National Standards Institute/American Society of Mechanical Engineers NQA-1 Quality Assurance Program Requirements for Nuclear Facilities. The 18 elements defined in the standard are tailored to HAZWRAP's needs. The QA program requirements are delineated under the major headings: Quality Assurance Program, Organization, ...
The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the ...
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public ...
This document reports the results of the FY 2005 PNNL VPP Program Evaluation, which is a self-assessment of the operational and programmatic performance of the Laboratory related to worker safety and health. The report was compiled by a team of worker representatives and safety professionals who evaluated the Laboratory's worker safety and health programs on the basis of DOE-VPP criteria. The principle elements of DOE's VPP program are: Management Leadership, Employee Involvement, Worksite Analysis, Hazard Prevention and Control, and Safety and Health Training.
Recreational Programming (RecPro) is the discipline that encourages the study of computer programming through ludic problems. Problems that are typically studied within this discipline are similar to those of Recreational Mathematics (RecMat), which sometimes leads to the confusion of these two disciplines. The objective for RecPro is to write programs, while RecMat practitioners can use these programs to state (and prove if possible) conjectures about the solution. This interaction leads to a mathematical quality production. In an educational framework, problems in elemental number theory (those that are formulated with a basic knowledge of arithmetic) are very interesting, leading to the revision of classical unsolved problems. One of these problems is the general form of Zumkeller numbe...
...BUBL LINK: Computer programming - visual basic BUBL LINK Catalogue of Internet Resources Home | Search | Subject Menus | Countries ...O | P | Q | R | S | T | U | V | W | X | Y | Z Computer programming - visual basic Titles ... Author: Microsoft Subjects: computer programming - visual basic DeweyClass: 005.133 Resource type: software SearchVB....com Subjects: computer programming - visual basic DeweyClass: 005.133 Resource type: index VB Helper Tutorials ...
This probabilistic analysis of WIPP TRUDOCK crane failure is based on two sources of failure data. The source for operator errors is the report by Swain and Guttman, NUREG/CR-1278-F, August 1983. The source for crane cable hook breaks was initially made by WIPP/WID-96- 2196, Rev. O by using relatively old (1970s) U.S. Navy data (NUREG-0612). However, a helpful analysis by R.K. Deremer of PLG guided the authors to values that were more realistic and more conservative, with the recommendation that the crane cable/hook failure rate should be 2.5 x 10-6 per demand. This value was adopted and used. Based on these choices a mean failure rate of 9.70 x 10-3(1/yr) was calculated. However, a mean rate by itself does not reveal the level of confidence to be associated with this number. Guidance to making confidence calculations came from the report by Swain and Guttman, who stated that failure data could be described by lognormal distributions. This is ...
The Safeguards and Security Technology Development Directory is published annually by the Office of Safeguards and Security (OSS) of the US Department of Energy (DOE), and is Intended to inform recipients of the full scope of the OSS R&D program. It is distributed for use by DOE headquarters personnel, DOE program offices, DOE field offices, DOE operating contractors, national laboratories, other federal agencies, and foreign governments. Chapters 1 through 7 of the Directory provide general information regarding the Technology Development Program, including the mission, program description, organizational roles and responsibilities, technology development lifecycle, requirements analysis, program formulation, the task selection process, technology development infrastructure, technology transfer activities, and current research and development tasks. These chapters are followed ...
The Quality Assurance Requirements and Description (QARD) is the principal quality assurance document for the Civilian Radioactive Waste Management Program (Program). It establishes the minimum requirements for the Quality Assurance Program. The QARD contains regulatory requirements and program commitments necessary for the development of an effective quality assurance program. Quality assurance implementing documents must be based on, and consistent with, QARD requirements. The QARD applies to the following: (1) acceptance of spent nuclear fuel and high-level radioactive waste; (2) transport of spent nuclear fuel and high-level radioactive waste; (3) the Monitored Retrievable Storage (MRS) facility through application for an operating license; (4) Mined Geologic Disposal System (MGDS), including the site characterization activities (exploratory studies facility (ESF) and surface ...
This 4.5-year project consisted of routine analytical support to DOE`s direct liquefaction process development effort (the Base Program), and an extensive effort to develop, demonstate, and apply new analytical methods for the characterization of liquefaction process streams (the Participants Program). The objective of the Base Program was to support the on-going DOE direct coal liquefaction process development program. Feed, process, and product samples were used to assess process operations, product quality, and the effects of process variables, and to direct future testing. The primary objective of the Participants Program was to identify and demonstrate analytical methods for use in support of liquefaction process develpment, and in so doing, provide a bridge between process design, development, and operation and analytical chemistry. To achieve this direct coal ...
Case studies were made of the following dislocated worker programs: Cummins Engine Company Dislocated Worker Project; GM-UAW Metropolitan Pontiac Retraining and Employment Program; Minnesota Iron Range Dislocated Worker Project; Missouri Dislocated Worker Program Job Search Assistance, Inc.; Hillsborough, North Carolina, Dislocated Worker Project; Cleveland, Ohio, United Labor Agency Dislocated Worker Project; Houston Community College-Texas Employment Commission Dislocated Worker Project; Tacoma, Washington, ASARCO Copper Smelter Dislocated Worker Project; and Dane County, Wisconsin, Dislocated Worker Project. All of these programs had placement rates higher than those of Comprehensive Employment and Training Act (CETA)-funded demonstrations, and only two of the programs for which a wage replacement ratio could be calculated had ratios below that of the CETA demonstrations. ...
This report describes the LIFECC computer program developed for the purpose of calculating the cost of energy produced by wind systems according to the principles of life cycle costing (LCC). Following a brief explanation of the LCC concept and its advantages, input variables to the program and their importance to various program users, including manufacturers and designers, utilities, various institutions and consumers, are explained. A detailed user's guide to the program is then provided, together with a sensitivity analysis which discusses the impact of key variables on wind system cost of energy and the importance of cash flow to the wind system purchaser. Sample cases of program output and an LIFECC program listing are provided.
This paper discusses how the U.S. Liquid Metal Reactor Development Program has been restructured to carry out R and D on advanced reactor technology. The program gives particular emphasis to improvements to reactor safety. The new directions are based on the technology of the integral fast reactor (IFR). Much of the basis for superior safety performance using IFR technology has been experimentally verified and aggressive programs continue in EBR-II and TREAT. Progress has been made in demonstrating both the metallic fuel and the new electrochemical processes of the IFR. The FFTF facility is converting to metallic fuel; however, FFTF also maintains a considerable U.S. program in oxide fuels. In addition, generic programs are continuing in steam generator testing, materials development, and with international cooperation, aqueous reprocessing.
Surveillance and maintenance (S & M) of 75 sites were conductd by the Remedial Action Section for the Environmental Restoration Program for surplus facilities and sites contaminated with radioactive materials and/or hazardous chemicals. S & M activities on these sites were conducted from the end of their operating life until final facility disposal or site stabilization. The objectives of the Waste Area Grouping S & M Program are met by maintaining a program of routine S & M as well as by implementing interim corrective maintenance when deemed necessary as a result of site surveillance. This report briefly presents this program`s activities and includes tables indicating tank levels and dry well data for FY 1991.
Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a ...
Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a ...
This document is intended to serve two purposes. Its first purpose is that of a program status report of the considerable progress that the Department of Energy (DOE) has made since 1993, the time of the last such report (DOE/ER-0536, {open_quotes}The DOE Program in HPCC{close_quotes}), toward achieving the goals of the High Performance Computing and Communications (HPCC) Program. The second purpose is that of a summary report of the many research programs administered by the Mathematical, Information, and Computational Sciences (MICS) Division of the Office of Energy Research under the auspices of the HPCC Program and to provide, wherever relevant, easy access to pertinent information about MICS-Division activities via universal resource locators (URLs) on the World Wide Web (WWW). The information pointed to by the URL is updated frequently, and the interested reader is urged to ...
This Wetlands Assessment has been prepared in accordance with the Department of Energy`s (DOE) Code of Federal Regulations (CFR) 10 CFR 1022, Compliance with Floodplain/Wetlands Environmental Review Requirements, which established the policy and procedure for implementing Executive Order 11990, Protection of Wetlands. The proposed action is to conduct characterization activities in or near wetlands at the ANS site. The proposed action will covered under a Categorical Exclusion, therefore this assessment is being prepared as a separate document [10 CFR 1022.12(c)]. The purpose of this Wetlands Assessment is to fulfill the requirements of 10 CFR 1022.12(a) by describing the project, discussing the effects of the proposed action upon the wetlands, and considering alternatives to the proposed action.
By means of an analogous simulator, which can simulate a power supply system, a method to determine the transfer function of a Power System Stabilizer (PSS) is developed. The purpose of the PSS is to damp unwanted electro-mechanical oscillations. The method is very systematic and there is no need for specified values of the parameters used in the system. It is assumed that the power generator system is linear for small variations. The system can be considered to be a black box. Measurements executed by means of this method are completely controlled by the person who enforces the measurement. By applying this method carefully, irregularities are almost out of the question. The equipment necessary are a PC with two AD-ports and an adjustable sinus-generator. A comparison is made with a more traditional method, in which a spectrum analyzer is used. 4 figs., 7 refs.
An uncomfortable thermal climate, draft complaints and a bad airquality are often related to the climate installation. To avoid badfunctioning of the system a number of preconditions has to be fulfilledwith regard to design, planning and execution, adjustments, completion,control, maintenance and management of the installations. First threetypes of health problems in buildings are shortly discussed: buildingrelated illness, sick building syndrome and building or installationrelated complaints. Then some functions of the climate installationsare described: air filtration, filter classes and filter quality, aswell as investment costs for better filters. Next the causes for thecomplaints are dealt with: air conditioning, ventilation, air quality,and temperatures. Subsequently health affecting aspects in relation tothe climate systems are discussed: outdoor air pollution,microorganisms, bacteria (legionella pneumophila), allergies, ionneutralization and performance of ...
This report describes the empirical research into barriers to energy efficiency in the German higher education (HE) sector. It is one of nine such reports in the BARRIERS project. The report contains description and analysis of six case studies of energy management in German universities. The results are analysed using the theoretical framework developed for the BARRIERS project (Sorrell et al., 2000). The report also provides brief recommendations on how these barriers to the rational use of energy (RUE) may be overcome and how energy efficiency within the sector may be improved. The results of the study for the higher education sector in Germany are summarised in this executive summary under the following headings: - Characterising the higher education sector; - Case studies of energy management in the German higher education sector; - Evidence of barriers in the German higher education sector; - The role of energy service companies in the higher education ...
This paper is concerned with the real time automatic discriminating of flaws from two categories; i. cracks (planar defect) and ii. Non-cracks (volumetric defect such as cluster porosity and slag) using pulse-echo ultrasound. The raw ultrasonic flaws signal were collected from a computerized robotic plane scanning system over the whole of each reflector as the primary source of data. The signal is then filtered and the analysis in both time and frequency domain were executed to obtain the selected feature. The real time feature analysis techniques measured the number of peaks, maximum index, pulse duration, rise time and fall time. The obtained features could be used to distinguish between quantitatively classified flaws by using various tools in artificial intelligence such as neural networks. The proposed algorithm and complete system were implemented in a computer software developed using Microsoft Visual BASIC 6.0 (author)
We report on the improvement of Critical Dimension (CD) linearity on a photomask by applying the concept of process proximity correction to a laser lithographic process used for fabrication of photomasks. Rule-based Laser Process proximity Correction (LPC) was performed using an automated optical proximity correction tool and we obtained dramatic improvement of CD linearity on a photomask. A study on model-based LPC was executed using a two-Gaussian kernel function and we extracted model parameters for the laser lithographic process by fitting the model-predicted CD linearity data with measured ones. Model-predicted bias values of isolated space (I/S), Arrayed Contact (A/C) and Isolated Contact (I/C) were in good agreement with those obtained by the nonlinear curve-fitting method used for the rule-based LPC.
We report on the improvement of Critical Dimension (CD) linearity on a photomask by applying the concept of process proximity correction to a laser lithographic process used for fabrication of photomasks. Rule-based Laser Process proximity Correction (LPC) was performed using an automated optical proximity correction tool and we obtained dramatic improvement of CD linearity on a photomask. A study on model-based LPC was executed using a two-Gaussian kernel function and we extracted model parameters for the laser lithographic process by fitting the model-predicted CD linearity data with measured ones. Model-predicted bias values of isolated space (I/S), Arrayed Contact (A/C) and Isolated Contact (I/C) were in good agreement with those obtained by the nonlinear curve-fitting method used for the rule-based LPC.
An Oil Shale Mining Economic Model (OSMEM) was developed and executed for mining scenarios representative of commercially feasible mining operations. Mining systems were evaluated for candidate sites in the Piceance Creek Basin. Mining methods selected included: (1) room-and-pillar; (2) chamber-and-pillar, with spent shale backfilling; (3) sublevel stopping; and (4) sublevel stopping, with spent shale backfilling. Mines were designed to extract oil shale resources to support a 50,000 barrels-per-day surface processing facility. Costs developed for each mining scenario included all capital and operating expenses associated with the underground mining methods. Parametric and sensitivity analyses were performed to determine the sensitivity of mining cost to changes in capital cost, operating cost, return on investment, and cost escalation.
Microanalytical methods suitable for the determination of Fe, Cu in HT-29 (human colon adenocarcinoma) cells treated with different iron compounds (Fe(II) sulfate, Fe(III) chloride, Fe(III) citrate and Fe(III) transferrin) and cultured in medium supplemented or not with 10% (v/v) fetal calf serum (FCS) by total reflection X-ray fluorescence spectrometry (TXRF) and simultaneous graphite furnace atomic absorption spectrometry (GF-AAS) were developed. The developed TXRF method was also suitable for Zn determination in the samples. The main advantage of the proposed methods is the execution of all sample preparation steps following incubation and prior to the elemental analysis in the same Eppendorf tubes. Sample preparation was performed at microscale (115mL sample volume) with 65% nitric aci...
Shell UK Exploration and Production, operating in the North Sea on behalf of Shell UK and Esso UK is presented developing the Teal and Guillemot fields in the Central North Sea (CNS). As part of this development it contracted with Single Buoy Moorings Inc., (SBM) for the design, supply and installation of a newbuilt floating Production Storage and Offloading (FPSO) vessel. The work is executed in close cooperation between Shell Expro (Client) and SBM (Contractor) and its main sub contractors. The system is due to be installed during the third quarter of 1996. After a short description of the field development and the FPSO vessel this paper outlines the contractual arrangements and the organization set-up to perform the work. A summary of the lessons learned (by SBM) is given. The opinions expressed in this paper are entirely that of the author and may not necessarily reflect the opinion of other parties involved in the CNS FPU project.
Purpose - This paper uses data about the challenges and difficulties confronting organisations and leaders to advance a dualized meaning of corporate leadership in the context of a developing country. The purpose is to describe a leadership frame that is locally contextualised, thereby bringing conceptualisation and thought closer to action, reified reality and applicability. Design/methodology/approach - This research was designed as a series of three studies starting from an applied/interventionist standpoint. The first study used data from applied diagnostic interventions, the second used qualitative interviews and the third used open-ended questionnaires. Data were collected from 25 Ghanaian organisations and 29 corporate executives. Findings - Drawing on a range of everyday issues suc...
In this paper we present results of using parallel supercomputers to simulate beam dynamics in next-generation high intensity ion linacs. Our approach uses a three-dimensional space charge calculation with six types of boundary conditions. The simulations use a hybrid approach involving transfer maps to treat externally applied fields (including rf cavities) and parallel particle-in-cell techniques to treat the space-charge fields. The large-scale simulation results presented here represent a three order of magnitude improvement in simulation capability, in terms of problem size and speed of execution, compared with typical two-dimensional serial simulations. Specific examples will be presented, including simulation of the spallation neutron source (SNS) linac and the Low Energy Demonstrator Accelerator (LEDA) beam halo experiment.
Cache locking technique is often utilized to guarantee a tighter prediction of Worst-Case Execution Time (WCET) which is one of the most important performance metrics for embedded systems. However, in Multi-Processor Systems-on-Chip (MPSoC) systems with multi-tasks, Level 2 (L2) cache is often shared among different tasks and cores, which leads to extended unpredictability of cache. Task assignment has inherent relevancy for cache behavior, while cache behavior also affects the efficiency of task assignment. Task assignment and cache behavior have dramatic influences on the overall WCET of MPSoC. This paper proposes joint task assignment and cache partitioning techniques to minimize the overall WCET for MPSoC systems. Cache locking is applied to each task to guarantee a precise WCET. We pr...
Global supply chain practices and their effects have received considerable attention over the last two decades. In the recent past, the need for integration across supply chains has been identified as a key for effective and efficient operations of supply chains. This is observed with the increasing trend of collaborative partnerships among supply chain partners. This paper presents an integrated approach for manufacturing and distribution networks within the supply chain system of a global car company. The paper shows that the integration of manufacturing and distribution networks creates the environment for effective planning of many components and execution/follow-up of those plans. These components include materials, resources, operations/activities, suppliers and customers. The main f...
Prepulse inhibition (PPI) is a measure of sensorimotor gating, a pre-attentional inhibitory brain mechanism that filters extraneous stimuli. Prepulse inhibition is correlated with measures of cognition and executive functioning, and is considered an endophenotype of schizophrenia and other psychiatric illnesses in which patients show PPI impairments. As a first step toward identifying genes that regulate PPI, we performed a quantitative trait locus (QTL) screen of PPI phenotypes in a panel of mouse chromosome substitution strains (CSSs). We identified five CSSs with altered PPI compared with the host C57BL/6J strain: CSS-4 exhibited decreased PPI, whereas CSS-10, -11, -16 and -Y exhibited higher PPI compared with C57BL/6J. These data indicate that A/J chromosomes 4, 10, 11, 16 and Y harbor...
The purpose of this note is to provide guidance to those who have duties under the Health and Safety at Work Act and other relevant legislation. It gives guidance on the practical application of legislation, concerning radiotherapy equipment. Two particular issues arise out of the requirements of Regulation 33 of the Ionising Radiations Regulations 1985 (IRR85) in relation to equipment which is used for medical exposures. These are the requirement to select, install and maintain this type of equipment in such a way that it is capable of restricting, so far as reasonably practicable, the medical exposure of any person where this is compatible with the intended clinical purpose, including the need to ensure that equipment used for radiotherapy is properly calibrated, and the requirement to notify the Health and Safety Executive (HSE) when an incident occurs involving a malfunction or defect in any 'radiation equipment' which gives rise to a medical ...
In 1980 through 1982 a Basewide Energy Systems Plan (BESP) was developed under the direction of the Corps of Engineers at Ft. McClellan to assist the installation in meeting the requirements of the Army Facilities Energy Plan and the ten (10) year Energy Use Reduction Goal. Some of the energy saving projects recommended by the BESP have been implemented. In FY 1977, the total base energy consumption was 1,105,221 MBtu (Million British thermal units). By FY 1987, this had been reduced to 870,900 MBtu, a reduction of twenty-one percent (21%). This resulted in a cost avoidance for FY 1987 over base year FY 1977 of $2,960,986, or a thirty-two percent (32%) reduction.
The contribution examines whether the construction of high-voltage transmission lines without formal participation of local authorities is permissible. In this connection the question is also treated to what extent municipal co-determination in transmission line construction represents a precondition for the permissibility of compulsory purchase measures. The individual issues treated are: the formal legal situation and current practice in the construction of electricity pylons; individual legal protection in connection with compulsory purchase; the construction of pylons without a construction licence as an infringement of the municipal right to self-government of local authorities; and the effects on the execution of compulsory purchase procedures of the illegality under Building Law of pylons constructed without approval. (RST).
Purpose - Holding the number of outside directorships constant, this paper aims to test whether executive directors from superior performing firms are subsequently rewarded with better quality outside directorships. Design/methodology/approach - The quality of new outside directorship appointments is modelled using a two-step Heckman selection procedure to control for the probability of acquiring a new outside board seat. Outside directorship quality is estimated using an index formed from series of observable firm-specific characteristics proxying for the following three latent aspects of quality: prestige, reputational risk and monetary rewards. The index aggregates across these three dimensions to produce an overall quality score, with higher scores signifying higher quality directorshi...
SummaryThis paper evaluates the status of digitization in 30 Nigerian university libraries with a view to identifying the status, progress, prospects and challenges to digitize library materials and form the basis of providing a roadmap to successful execution of digitization projects. The study assessed the status of digitization of past question papers, theses and dissertations in Nigerian university libraries from May to September 2006 through a self-administered questionnaire, site visits and interviews. It was found that, though there are automation services in those universities, there is no digitization of these materials mentioned in the surveyed institutions. The major obstacles militating against digitizing in the university libraries include lack of funds, lack of appropriate fa...
After having discussed the peculiarities of children in X-ray diagnosis the application of the effective as well as the mean equivalent doses as to the determination of the radiation exposure in children is represented. In using computerized tomograms to determine position and extent of an organ the exposure by repeated X-raying was calculated referring to the entrance dose. Entrance dose measurements for all types of X-ray examination in hospitals and ascertainments of the frequency of radiograms in 20 X-ray departments were used to determine per capita and collective doses, resp., in several age groups. Alltogether, the per capita dose of children in the GDR amounts to 30% of that of adults. Conclusions were drawn as to taking measures to further reduction of radiation exposure: (1) Technical measures, such as positioning of patients, shielding of organs, quality assurance; (2) elaboration of regulations concerning the execution of X-raying in children and ...
The effect of high lift airfoils on the cost effectiveness of HAWT and VAWT (horizontal and vertical axis wind turbine) machines is studied. The scope involved first studying modern two dimensional airfoils, and developing a generalized formulation for their performance in terms of lift, drag, and thickness at appropriate Reynolds numbers. Single element, multi-element, symmetrical, extra thick airfoils and jet flap airfoils were analyzed. The jet flap airfoils were considered to be unacceptable because of excessive power requirements. Then the effect of using the above airfoils on the rotors of a variety of wind turbines was made. Qualitative representation of the type of airfoils studied is given.
A methodology is proposed to facilitate the construction of gridded bathymetry data for the use of hydrodynamic models on the continental shelf. It relies on the carrying out of three successive tasks: (1) automatic selection of records of better quality among multiple sets of overlapping data; (2) elimination of data points located on land; and (3) taking into account the shoreline as bathymetric data. Algorithms are proposed to perform sorting of the records according to their quality as well as masking by the coastline. The suggested method facilitates the updating of bathymetry data and optimizes their use. It enables automatic execution of all the tasks and building of new digital bathymetry models in a few hours, without action from the operator. The method has been tested many times...
Dispersal can be regarded as a process operating both between and within patches of suitable habitat. For uncontrolled dispersal processes, the risk of crossing the borders of the habitat patch and arriving in the unsuitable landscape matrix will increase with decreasing patch area, in particular when the distance between isolated habitat patches is larger than the species' average dispersal capacity. Ballooning dispersal in spiders can be considered as a passive dispersal process, in which dispersed distances depend on the prevalent wind velocity. We executed a reaction norm analysis to analyze how dispersal propensity of the salt marsh wolf spider Pardosa purbeckensis depended on population characteristics (patch size) and the environment (wind velocity). Dispersal propensity was affecte...
This association participated in different working groups: North Cotentin radioecology group, groups of expertise on the uranium mines of Limousin, executive committee for the management of the post accidental phase of a nuclear accident or a radiological emergency situation, radioactive waste management, radiological surveillance of the territory, radiation protection mission by the Asn, radiological surveillance of the environment of the Chinon nuclear power plant, study of the presence of {sup 235}U around the site of Brennilis, study of the radioactive waste management at the Manche plant, radiological surveillance of the Cyceron cyclotron at Caen, Aurengo commission on the consequences in France of the Chernobylsk accident. Actions of information, regular publications, meeting with public are also a part of the work of this association. (N.C.)
This paper presents results from a research case study that examined the distribution of travel time of origin-destination (OD) pairs on a transportation network under incident conditions. Using a transportation simulation dynamic traffic assignment (DTA) model, incident on a transportation network is executed under normal conditions, incident conditions without traveler information availability, and incident conditions assuming that users had perfect knowledge of the incident conditions and could select paths to avoid the incident location. The results suggest that incidents have a different impact on different OD pairs. The results confirm that an effective traveler information system has the potential to ease the impacts of incident conditions network wide. Yet it is also important to n...