WorldWideScience
 
 
1

Climate change/variability implications on hydroelectricity generation in the Zambezi River Basin  

British Library Electronic Table of Contents (United Kingdom)

The study has analysed the effects of various factors on hydroelectric power generation potential to include climate change/variability, water demand, and installation of proposed hydroelectric power schemes in the Zambezi River Basin. An assessment of historical (1970?2000) power potential in relation to climate change/variability at existing hydro electric power schemes(Cahora Bassa, Kariba, Kafue Gorge and Itezhi-Tezhi) in the Zambezi River Basin was conducted. The correlation of hydroelectric power potential with climate change/variability aimed at observing the link and extent of influence of the latter on the former was investigated. In order to predict the future outlook of hydro electric power potential, General Circulation Models (GCM) were used to generate projected precipitation...

2011-01-01

2

Kokanee Stock Status and Contribution of Cabinet Gorge Hatchery, Lake Pend Oreille, Idaho, 1986 Annual Progress Report.  

Energy Technology Data Exchange (ETDEWEB)

Estimated kokanee (Oncorhynchus nerka) abundance in Lake Pend Oreille was 4.3 million during September 1986. This estimate was similar to 1985 and indicates continued suppression of the kokanee population since initial decline in the late 1960s. Atypically high survival of wild fry resulted in similar fry recruitment in 1986 as 1985, whereas hatchery-reared fry contributed only 8% to total fry recruitment as a result of low post-release survival (3%). Fry released into the Clark Fork River from Cabinet Gorge Hatchery had very low survival during emigration to Lake Pend Oreille, resulting from poor flow conditions and potentially high predation. Fry survival during emigration was twice as high during nighttime flows of 16,000 cfs than 7,800 cfs. Emigration also was faster during higher flows. Several marks were tested to differentially mark fry release groups to help determine impacts of flow and other factors on fry survival. Survival of fry ...

1987-02-01

4

JPRS Report, Science & Technology, China: Energy  

Science.gov (United States)

... should give full con- As for the effects of the Three Gorges on the mouth of sideration to the rising water process and water temper- the river, the ...

1991-08-23

5

The Earth in energy troubles; La Planete en mal d'energie  

Energy Technology Data Exchange (ETDEWEB)

This document gathers the available presentations (articles and transparencies) given at this annual meeting, the 2007 topic of which was the technological, geopolitical, economical, environmental, societal and development stakes of energy. 1 - technological stakes - which energies for the future: new energies, illusion or solution of the future; the Lorraine region, an energy land: strategies and stakes for a sustainable development; from China to Brazil: understanding the nuclear energy revival; hydroelectric power: renewable and sustainable energy; renewable energies and environment protection: the contribution of biofuels; wind power in Germany between success and contestation; 2 - geopolitical stakes - energy levier of power: the Gulf of Guinea hydrocarbons: between development and geopolitics; the complex evaluation of resources and reserves between technology, market and geopolitics; the new Bakou-Tbilissi-Ceyhan pipeline: what impacts for Turkey and the ...

2007-07-01

6

Drilling a pipeline: Anadarko finds a way to release gas blocked from market by a river gorge  

Energy Technology Data Exchange (ETDEWEB)

Drilling of a pair of horizontal wells two miles apart by Anadarko Canada to create a pipeline crossing beneath a deep river gorge on northeastern British Columbia is described. Anadarko has been sitting on a 200 bcf gas reservoir for the last five years but was prevented from producing gas from the reservoir by the 1,000-metre deep Buckinghorse River gorge. After various other options were found to be unsuitable either from a technical or economic standpoint, Anadarko decided to drill beneath the river from stable positions well back from the the edge of the gorge. Two wells were drilled horizontally to a depth of 1,400 metres from locations two miles apart on either side of the gorge. The distance between the wells, and the depth of the wells, made the operation the first of its kind in North America, but more importantly, it allowed the reserve to deliver nine mmcf of gas per day, and opened up ...

2005-01-03

7

Small-scale hydroelectric power demonstration project: Boott Hydropower, Inc. Eldred L. Field Hydroelectric Project: Final technical and construction cost report  

Energy Technology Data Exchange (ETDEWEB)

The Lowell Hydroelectric Project (Eldred L. Field) is a key feature of the Departments of Energy's National Low Head Hydroelectric Power Demonstration Program. This report summarizes the Project's Construction which began in October 1983 and was completed in November 1985. It also details project construction costs.

1988-03-01

8

The Benchmark Test Results of QNX RTOS  

International Nuclear Information System (INIS)

A Real-Time Operating System(RTOS) is an Operating System(OS) intended for real-time applications. Benchmarking is a point of reference by which something can be measured. The QNX is a Real Time Operating System(RTOS) developed by QSSL(QNX Software Systems Ltd.) in Canada. The ELMSYS is the brand name of commercially available Personal Computer(PC) for applications such as Cabinet Operator Module(COM) of Digital Plant Protection System(DPPS) and COM of Digital Engineered Safety Features Actuation System(DESFAS). The ELMSYS PC Hardware is being qualified by KTL(Korea Testing Lab.) for use as a Cabinet Operator Module(COM). The QNX RTOS is being dedicated by Korea Atomic Energy Research Institute (KAERI). This paper describes the outline and benchmarking test results on Context Switching, Message Passing, Synchronization and Deadline Violation of QNX RTOS under the ELMSYS PC platform

2010-10-01

9

Small power production case study: Montello hydroelectric plant, Montello, Wisconsin  

Energy Technology Data Exchange (ETDEWEB)

A case study of a small-scale hydroelectric plant to identify implementation problems is presented. The Montello hydroelectric plant is described including the background and history of the plant, the physical characteristics, the financial history and costs, operation, regulatory agencies, and the problems encountered in its operation. The analyses of the energy and capacity (demand) credits for the Montello hydroelectric plant when it is added to the Wisconsin Power and Light Company generating system is described. The WP and L base case and the results of the analyses are discussed. (WHK)

1980-11-01

10

Hydroelectric Power Plants Electrical Design  

Science.gov (United States)

... Treatment of electrical systems for pumped storage plants is not covered in the manual, although much of the information is applicable to pumped ...

1994-06-30

11

International water power and dam construction yearbook 1996  

Energy Technology Data Exchange (ETDEWEB)

This document draws together data on hydroelectric power generation and dam construction for 1996. Machinery such as turbines and hydroelectric generators are listed together with their manufacturers. Contact addresses for international organizations concerned with water power are listed. Listings are also given for hydro resources worldwide, and the global distribution of pumped-storage plants, dams and hydroelectric plants. Company data is also listed providing a buyer`s guide for 1996. (UK)

1996-12-31

12

home  

Wastenet

... It has 2x 15L bins: one for food waste, the other for recycling, which slide out on ball bearing steel runners. Both have plastic inner buckets that can be lifted out. Supplied with fixing brackets. To fit 30cm-wide cabinets Filed Under: Top Products Tagged With: bedroom, bins, drawers, drawersshelveskitchenbins, garden, home, homegardenbedroomstorage, John Lewis, kitchen, shelves, storage ...

13

Five TWh saved on profitable upgrading  

International Nuclear Information System (INIS)

Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of ...

14

New Alberta coal mine gets green light  

Energy Technology Data Exchange (ETDEWEB)

McLeod River Coal Ltd., a wholly owned subsidiary of Manalta Coal Ltd., has received Alberta Energy Resources Conservation Board approval to establish an open pit coal mine and plant in the northwest portion of the Coalspur field, east of Hinton. McLeod proposes to produce up to 4.2 million tonnes/year of thermal coal for 40 years, starting in 1985. The commercial viability of the project must be assessed before construction starts at the McLeod River site. The Board's ruling is subject to provincial cabinet approval.

1983-02-01

15

Use of the acoustic method for checking the quality of concrete of hydroelectric and pumped storage stations  

Energy Technology Data Exchange (ETDEWEB)

This article describes acoustic methods used in the in-service inspection of the dams and peripheral concrete structures of the Toktogul, Kurpsai, and Bratsk hydroelectric and pumped storage plants. The tests were conducted to assess the compression strength, elasticity, and tensile strength of the concretes. Comparative evaluations against drill core studies proved the acoustic methods to be sufficiently accurate in predicting aging behavior and loss of mechanical and physical integrity in the concretes.

1987-09-01

16

Machine condition monitoring  

Energy Technology Data Exchange (ETDEWEB)

A consortium has been formed to undertake the design and development work necessary to establish a comprehensive machine condition monitoring (MCM) and diagnostic system for hydroelectric generating units. By working closely with participating utilities and interested manufacturers, the consortium is initiating the integration of existing and developing technologies into a comprehensive, modular, on- and off-line hydroelectric MCM system.

1995-12-31

17

Hydroelectricity - An Answer To Energy Needs  

Energy Technology Data Exchange (ETDEWEB)

The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.

2010-09-15

18

(Feasibility study of the San Lorenzo River hydroelectric project)  

Science.gov (United States)

I travelled to San Jose, Costa Rica on July 8, 1990 to evaluate all of the completed elements of the ongoing feasibility study for the San Lorenzo River hydroelectric project. The feasibility study is being supported by ORNL under the Renewable Energy Applications and Training Project. The project is being studied for implementation by CONELECTRICAS, a consortium of rural electric cooperatives and the study itself is being conducted by BEL Engineering, a Costa Rican consulting firm under contract to CONELECTRICAS, USAID/PIC and NRECA.

1990-07-19

19

Review of Pacific Northwest Laboratory research on aquatic effects of hydroelectric generation and assessment of research needs  

Energy Technology Data Exchange (ETDEWEB)

This report is an overview of Pacific Northwest Laboratory's (PNL) research on how hydroelectric generation affects aquatic biota and environments. The major accomplishments of this research are described, and additional work needed to permit optimal use of available data is identified. The research goals are to: (1) identify impacts of hydroelectric generation, (2) provide guidance in allocating scarce water resources, and (3) develop techniques to avoid or reduce the impacts on aquatic communities or to compensate for unavoidable impacts. Through laboratory and field experiments, an understanding is being developed of the generic impacts of hydrogeneration. Because PNL is located near the Columbia River, which is extensively developed for hydroelectric generation, it is used as a natural laboratory for studying a large-scale operating system. Although the impacts studied result from a particular system of dams ...

1981-05-01

20

Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach  

British Library Electronic Table of Contents (United Kingdom)

This paper uses multi-pass iteration particle swarm optimization (MIPSO) to solve short term hydroelectric generation scheduling of a power system with wind turbine generators. MIPSO is a new algorithm for solving nonlinear optimal scheduling problems. A new index called iteration best (IB) is incorporated into particle swarm optimization (PSO) to improve solution quality. The concept of multi-pass dynamic programming is applied to modify PSO further and improve computation efficiency.The feasible operational regions of the hydro units and pumped storage plants over the whole scheduling time range must be determined before applying MIPSO to the problem. Wind turbine power generation then shaves the power system load curves. Next, MIPSO calculates hydroelectric generation scheduling. It beg...

2008-01-01

 
 
 
 
21

Development of a central information system, communication system and cooperation system for the German Strategy for Adaptation to Climate Change (IKK-DAS); Aufbau eines zentralen Informations-, Kommunikations- und Kooperationssystems fuer die Deutsche Anpassungsstrategie an den Klimawandel (IKK-DAS)  

Energy Technology Data Exchange (ETDEWEB)

The research project started in April, 2008 before adoption of the cabinet report of the Federal Government to the German strategy for Adaptation to Climate Change. The German Strategy for Adaptation emphasizes the meaning of information about requirements for adaptation and the active involvement of all social groups in the other process of the strategy. For this the research project has made concrete proposals for the information, communication and participation of social groups. These proposals are based in the essentials on an interest analysis about interviews with stakeholders and the economy to their demands and expectations to the German strategy for Adaptation. Besides we have researched international examples for the adaptation to the climate change for the public relations. For the interactive development of the Internet platform www.anpassung.net concrete proposals were developed. (orig.)

2010-03-15

22

Cooperative research in coal liquefaction infratechnology and generic technology development: Final report, January 1, 1987 to April 30, 1988  

Energy Technology Data Exchange (ETDEWEB)

The Consortium for Fossil Fuel Liquefaction Science (CFFLS) is a research consortium that includes five universities and a state energy laboratory. The membership is comprised of Auburn University, the University of Kentucky, the University of Pittsburgh, the University of Utah, West Virginia University, and the Kentucky Energy Cabinet Laboratory. The Consortium was formed in 1984 in response to the concern of the faculty and scientists at these institutions over the decline of coal liquefaction research in the United States, particularly long-range, basic research. Significant progress towards these goals was made in the current contract period. Major research accomplishments are presented on coal desulfurization, coprocessing, pyrolysis, enhanced reactivity, characterization, resource evaluation and database development. 108 refs., 90 figs., 38 tabs.

1988-05-10

23

Supply of medium and small hydropower equipment  

Energy Technology Data Exchange (ETDEWEB)

This paper presents a brief account of Lingling Hydroelectric Power Equipment General Works, the capacity of equipment production, the organization body, the quality assurance system and supervision of government department on its product quality.

1995-07-01

24

Seal is successful at Italys largest pumped storage plant  

British Library Electronic Table of Contents (United Kingdom)

A HydroSele S seal from James Walker has provided more than two years maintenance-free service at the large Entracque pumped-storage hydroelectric scheme in Italy.

2008-01-01

25

Program plan for development of underground hydroelectric pumped storage technology  

Science.gov (United States)

The Underground Hydroelectric Pumped Storage (UHPS) Program Plan describes in detail the planned activities and expected accomplishments in the conduct of UHPS technology development and validation envisioned in the 1976 to 1990 time frame. This document describes the program objectives, implementation strategy, and management methodology. The concept of underground hydroelectric pumped storage is fully directed to application in the electric utility industry. This technology involves using electrical energy generated by base-load plants during off-peak load periods to drive a high-head pump/turbine which pumps water from a lower reservoir to a substantially elevated (upper) reservoir corresponding to a head of 1000 m or so. The upper reservoir is at ground level and the lower reservoir is below ground. Then, during peak-load periods, water in the upper reservoir is allowed to flow to the lower reservoir which, in turn, drives a hydraulic ...

1976-03-01

26

Preliminary study of the effect of pumped-storage plant operation on zooplankton  

Energy Technology Data Exchange (ETDEWEB)

The hydromechanical effect of hydroelectric stations on zooplankton is customarily regarded as a constantly acting and comparatively harmless factor, since its destruction is inevitable when water masses are passed through hydroelectric stations, but its capacity for restoration is high (i.e., destruction of the zooplankton of the forebay is compensated by its production in the after bay). It is not known how correct such an opinion is, or what is the true balance of losses and reproduction of zooplankton in the forebays and after bays of hydroelectric stations. However, hydroelectric plants of a new type, pumped-storage plants, have been constructed in recent years and others are planned for the Dnieper reservoirs. The operational principle and purpose of these plants is that they employ special vertical turbine-electric pumps that pump water at night from the reservoirs into pumped-storage facilities ...

1980-01-01

27

SIRIO: Computer system for the follow up and the optimum planning of short time exploitation of a hydroelectric system; SIRIO: sistema informatico para el seguimiento y la programacion optima de la explotacion a corto plazo de un sistema hidroelectrico  

Energy Technology Data Exchange (ETDEWEB)

Sirio is a computerized application to manage the hydroelectric system in a short time. This management is implemented as a real time tool in the Control Department. SIRIO has many modules, independent and integrated to operate and perform the data acquisition, optimization, planning simulation and planning optimization. This article presents the SIRIO System and its applications to the Iberdrola system in Tajo river.

1994-12-31

28

Hydroelectric and pumped storage plants  

Energy Technology Data Exchange (ETDEWEB)

All power plant engineers face the problem of peak power demands. Pumped storage plants are used to generate peak load power by pumping up water utilizing off-peak energy of hydrothermal and thermonuclear plants. This is the first accessible text/reference to cover hydroelectric power generation with emphasis on engineering to meet peak power demands by means of pumped storge plants, tidal power plants, and low head power generation. Text covers hydrology, mechanical and electrical equipment, accessories such as penstocks and valves, and civil engineering considerations. Contains descriptions of several existing plants. Includes 200 diagrams and 50 photographs.

1989-01-01

29

Hydroelectric and pumped storage plants  

Energy Technology Data Exchange (ETDEWEB)

All power plant engineers face the problem of peak power demands. Pumped storage plants are used to generate peak load power by pumping up water utilizing off-peak energy of hydrothermal and thermonuclear plants. This is a reference to cover hydroelectric power generation with emphasis on engineering to meet peak power demands by means of pumped storage plants, tidal power plants, and low head power generation. Text covers hydrology, mechanical and electrical equipment, accessories such as penstocks and valves, and civil engineering considerations. Contains descriptions of several existing plants. Includes 200 diagrams and 50 photographs.

1988-01-01

30

Feasibility study on the demonstrative test on the hybrid mini hydroelectric power generation technology. 2; Hybrid gata mini suiryoku hatsuden gijutsu ni kakawaru jissho shiken kanosei chosa. 2  

Energy Technology Data Exchange (ETDEWEB)

A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro ...

1996-03-01

31

Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach  

Energy Technology Data Exchange (ETDEWEB)

This paper uses multi-pass iteration particle swarm optimization (MIPSO) to solve short term hydroelectric generation scheduling of a power system with wind turbine generators. MIPSO is a new algorithm for solving nonlinear optimal scheduling problems. A new index called iteration best (IB) is incorporated into particle swarm optimization (PSO) to improve solution quality. The concept of multi-pass dynamic programming is applied to modify PSO further and improve computation efficiency. The feasible operational regions of the hydro units and pumped storage plants over the whole scheduling time range must be determined before applying MIPSO to the problem. Wind turbine power generation then shaves the power system load curves. Next, MIPSO calculates hydroelectric generation scheduling. It begins with a coarse time stage and searching space and refines the time interval between two time stages and the search spacing pass by pass (iteration). With ...

2008-04-15

32

International water power and dam construction handbook  

Energy Technology Data Exchange (ETDEWEB)

The first section of this Handbook describes hydro-electric projects currently under construction or recently commissioned in a number of countries. The major part of the Handbook is devoted to lists of data relating to hydro-electric plants and hydromachinery. These include: data for 1990 submitted by national power authorities on hydro-electric and pumped-storage plants in operation, under construction or planned; more detailed data for pumped-storage plants; country by country data on the dimensions, and reservoir and electrical capacity of major dams and hydro plant; a listing of roller compacted concrete dams; a listing of the world's largest turbines giving data on the largest unit at each scheme in rank order ranging from a unit capacity of 838 MV down to 147 MV; a similar list of the largest hydrogenerators ranging from a unit capacity of 825 MVA down to 150 MVA; details of turbine and generator contracts. ...

1992-01-01

33

The use of WASP model for planning the Portuguese electrical generating system: overcoming some difficulties  

International Nuclear Information System (INIS)

The paper discusses the methodology used at Electricidade de Portugal (EDP) in planning its electric power system. In particular, it considers a description of the methodology used by EDP for a more accurate definition of the input data required to characterize hydroelectric plants and the evaluation of their impact on an optimal long-term expansion plan. In addition, the paper describes an analysis of the results of studies, both with WASP-II and WASP-III, with and without pumped storage plants, respectively. Finally, the paper details the use of VALOR AGUA, in conjunction with WASP, for a better simulation of the hydroelectric system and which also permits to solve other problems closely connected such as the calculation of marginal production costs. (author).

1986-02-01

34

Hydro '88: incorporating third international conference on small hydro conference papers  

Energy Technology Data Exchange (ETDEWEB)

Thirty-nine conference papers review practical and topical aspects of hydroelectric development, from planning and design to construction, operation and refurbishment. More than half of the papers deal with small-scale hydro, reflecting the continuing strong interest in this subject throughout the world. The planning and economic evaluation of large-scale hydro schemes and pumped-storage plants, and environmental aspects of hydroelectric developments are also discussed. A special session has also been included on hydro in Latin America, where some of the world's largest schemes are planned or under construction. The papers reproduced here draw on the expertise of engineers from eighteen countries in North and South America, Europe, Asia, Australasia and Africa. All the papers were selected and indexed separately.

1988-01-01

35

Benefits and applications of modular hydroelectric pumped storage  

International Nuclear Information System (INIS)

This paper reports on hydroelectric pumped storage which is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize overall system performance. Because of increased environmental and regulatory constraints, few acceptable sites, long schedules, and huge financial commitments, large conventional pumped storage plants, are now virtually impossible to build. As an alternative, small modular pumped storage, with project sizes ranging from 25 MW to 200 MW, was created to overcome the difficulties of conventional projects. The modular approach involves standardizing the elements of a pumped storage plant by utilizing specialized siting techniques and optimizing design, equipment, and construction. Compared with conventional pumped storage, the modular design can reduce cost and expedite schedule; reduce environmental concerns and permitting obstacles; and expand ...

1991-07-24

36

Behind an ambitious megaproject in Asia: The history and implications of the Bakun hydroelectric dam in Borneo  

British Library Electronic Table of Contents (United Kingdom)

Using a case-study, inductive, narrative approach, this article explores the history, drivers, benefits, and barriers to the Bakun Hydroelectric Project in East Malaysia. Situated on the island of Borneo, Bakun Dam is a 204m high concrete face, rock filled dam on the Balui River in the Upper Rajang Basin in the rainforests of Sarawak. Bakun Dam and its affiliated infrastructure could be the single largest and most expensive energy project ever undertaken in Southeast Asia. Based on data collected through site visits, original field research in Sarawak, and more than 80 research interviews, the article begins by teasing out the complex history and drivers behind the Bakun project before identifying a set of potential social, political, and economic benefits the project could deliver. It the...

2011-01-01

37

A comprehensive condition monitoring system for hydro-electric generating units  

Energy Technology Data Exchange (ETDEWEB)

This paper describes a comprehensive MCM [machine condition monitoring] program and suggested system for implementation in hydroelectric generating units. The system addresses all the major subsystems which make up the generating unit. A modular design means that it could be applicable in a wide variety of situations. Different subsystems may be included or excluded from the monitoring system as required. It may be used at individual plants as a stand alone system or network wide. An advanced processing and diagnostic module is included, again for use as an integral part of the system or as a stand alone analysis tool. Examples of the system's proposed data analysis and diagnostic abilities are also described using vibration signals as would be provided by the bearing module. (Author)

1994-04-01

38

Reducing indoor air formaldehyde concentrations  

Energy Technology Data Exchange (ETDEWEB)

Urea-formaldehyde resin bonded particle board, medium density fiberboard and plywood paneling are used as flooring, wall paneling, for cabinet work and in furniture, and are present in almost every office, home and public building. If large quantities of these products are used in poorly ventilated spaces, high manufacturing quality control is necessary to avoid problems of latent formaldehyde release. Indoor air formaldehyde concentrations depend on the nature of the product, the product surface to air volume (loading) factor, temperature, humidity, age and product emission rates. Standard test methods are now available for measuring product emission rates that make it possible to predict the performance of UF-bonded pressed wood materials if use conditions and environmental parameters are known. Recent modifications in adhesive and board manufacturing parameters have made it possible to reduce formaldehyde emission significantly, and UF-bonded wood products are ...

1985-08-01

39

Localization explore of electrical and I and C equipments in Daya Bay Nuclear Power Station  

International Nuclear Information System (INIS)

The supply of electronic instrumentation and controlling (I and C) equipments in Daya Bay Nuclear Power Station depends on importation up to now, however, reliable supply of spare parts is presently threatened by many factors. Consequently, Daya Bay Nuclear Power Station tries to localize these equipments. According to a survey, China has possessed the ability to undertake the research, development and production of the I and C system in nuclear power independently. We propose that localization should firstly starts with the production of replacement board and parts for analogical I and C system, gradually leads to the substitution of system cabinet units, and finally realize the independent research, development and production of advanced digital main control system. A series of prominent problems of producing nuclear grade I and C equipments are focused on the designing, manufacturing, testing and reliability evaluation. In this paper, technical procedures, ...

2007-10-01

40

A study of public acceptance of construction of atomic power plant  

International Nuclear Information System (INIS)

In June 2010, Basic Energy Plan was approved in a Cabinet meeting. It says that Japan aims to construct more than 14 atomic power plants by 2030. Today, there are 12 plans of construction of atomic power plant, but it is hard to say that their plans easily come off. That's because public acceptance of atomic power plant is low in Japan, for example local residents wage opposition campaigns. This study conducts a survey in the form of a questionnaire and analyzes it by Analytical Hierarchical Process (AHP). Analytic Hierarchy Process is a structured technique for dealing with complex decisions. A questionnaire using AHP is very easy to answer and analyze. This survey was conducted in 2 areas. First area is Hohoku-cho, Yamaguchi Pref. that had a plan of construction of atomic power plant and the plan was demolished by opposition campaigns. Second area is Kaminoseki-cho, Yamaguchi Pref. that has a plan of construction of atomic power plant now and the plan is working ...

2011-01-01

 
 
 
 
41

The electric power industry in Czechoslovakia - development and present state. Entwicklung und gegenwaertiger Stand der tschechoslowakischen Elektrizitaetswirtschaft  

Energy Technology Data Exchange (ETDEWEB)

Some general topical information (generating capacity and electric power generation, development and structure of electric power consumption, frequency and peak load, exchange of electricity) is followed by an account of the situation of coal-fired power plants, hydroelectric power plants and nuclear power plants, and a brief discussion of the environmental situation (emissions and wastes, immissions, and air pollution abatement measures for power plants). (orig./UA).

1992-11-02

42

Snake River Sockeye Salmon Habitat and Limnological Research; 1995 Annual Report.  

Energy Technology Data Exchange (ETDEWEB)

This report contains studies which are part of the Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Attention is focused on population monitoring studies in the Sawtooth Valley Lakes. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

1996-05-01

43

Power system stabilizer from accelerating power for Itauba power plant: Design and implementation; Projeto e implantacao de estabilizador de sistema de potencia derivado da potencia de aceleracao na Usina de Itauba  

Energy Technology Data Exchange (ETDEWEB)

This work presents the project and relates the implementation of a power system stabilizer in Itauba hydroelectric power plant, Brazil. Some forecasts and field experiments are also presented. 10 refs., 19 figs.

1992-12-31

44

Guide to UK renewable energy companies 2001. 6. ed.  

International Nuclear Information System (INIS)

This 2001 edition of the guide to UK renewable companies and equipment and service providers presents summaries of the different industry sectors covering wind power, photovoltaics, solar water heating, geothermal heat pump, hydroelectric power, marine current and wave technology, bioenergy, power generation from landfill gas, energy from waste, and cogeneration. A UK company classification listing and index is provided along with listing of UK organisations and companies and an index of advertisers.

45

Entering the Canadian mainstream. [The independent energy market in Canada  

Energy Technology Data Exchange (ETDEWEB)

This article examines the developing market for independent power projects in Canada. The topics of the article include bidding in Ontario, the Quebec market, powering British Columbia, and market forces at work in Canada. Discussed are current projects in all stages of completion from bidding to production and includes gas-fired cogeneration, gas-fired combined-cycle electricity generation and cogeneration, wood-waste fired plants, repowering of existing utility plants, and hydroelectric power plants.

1992-04-01

46

Annual Report on Wildlife Activities, 1985 Fiscal Year, Action Item 40.1, Columbia River Basin Fish and Wildlife Program.  

Energy Technology Data Exchange (ETDEWEB)

The report presents a brief synopsis and discussion of wildlife activities undertaken by Bonneville Power Administration. The objectives of the program were wildlife protection, mitigation, and enhancement planning; and implementation of actions to protect, mitigate, and enhance wildlife affected by development and operation of hydroelectric facilities in the Columbia River Basin. (ACR)

1985-09-01

47

Storing hydroelectricity to meet peak-hour demand  

Energy Technology Data Exchange (ETDEWEB)

This paper reports on pumped storage plants which have become an effective way for some utility companies that derive power from hydroelectric facilities to economically store baseload energy during off-peak hours for use during peak hourly demands. According to the Electric Power Research Institute (EPRI) in Palo Alto, Calif., 36 of these plants provide approximately 20 gigawatts, or about 3 percent of U.S. generating capacity. During peak-demand periods, utilities are often stretched beyond their capacity to provide power and must therefore purchase it from neighboring utilities. Building new baseload power plants, typically nuclear or coal-fired facilities that run 24 hours per day seven days a week, is expensive, about $1500 per kilowatt, according to Robert Schainker, program manager for energy storage at the EPRI. Schainker the that building peaking plants at $400 per kilowatt, which run a few hours a day on gas or oil fuel, is less costly than building ...

1992-04-01

48

Storing hydroelectricity to meet peak-hour demand  

International Nuclear Information System (INIS)

This paper reports on pumped storage plants which have become an effective way for some utility companies that derive power from hydroelectric facilities to economically store baseload energy during off-peak hours for use during peak hourly demands. According to the Electric Power Research Institute (EPRI) in Palo Alto, Calif., 36 of these plants provide approximately 20 gigawatts, or about 3 percent of U.S. generating capacity. During peak-demand periods, utilities are often stretched beyond their capacity to provide power and must therefore purchase it from neighboring utilities. Building new baseload power plants, typically nuclear or coal-fired facilities that run 24 hours per day seven days a week, is expensive, about $1500 per kilowatt, according to Robert Schainker, program manager for energy storage at the EPRI. Schainker the that building peaking plants at $400 per kilowatt, which run a few hours a day on gas or oil fuel, is less costly than building ...

1992-01-01

49

Hydroelectric power in Switzerland: large growth potential by increasing the installed power  

International Nuclear Information System (INIS)

Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates ...

50

Construction and modernization of small hydroelectric installations with funding by programmes of the EU. Abstract; Neubau und Modernisierung von Kleinwasserkraftanlagen durch Foerderprogramme der E.U.. Kurzfassung  

Energy Technology Data Exchange (ETDEWEB)

The report gives a brief introduction into the EU grant programmes since 1984 and explains the philosophy behind them. The current situation regarding grant opportunities for the construction and modernization of small hydroelectric installations is outlined. Hints are given with a view to grant applications. A selection of small hydro power stations supported by grants (since 1984) are described with their economic and technical features. (orig.) [Deutsch] In diesem Beitrag wird eine kurze Einfuehrung in die EU-Foerderprogramme seit 1984 und Erlaeuterungen zu der Programmphilosophie gegeben. Die derzeitige Situation bezueglich der Foerderung von Kleinwasserkraftanlagen fuer Neubauten und Modernisierungsmassnahmen wird dargestellt. Es werden Hinweise zur Stellung eines Foerderantrags beschrieben. Abschliessend erfolgt die Vorstellung einer Auswahl von gefoerderten Kleinwasserkraftanlagen (seit 1984) mit den wirtschaftlichen und technischen Besonderheiten. (orig.)

1997-12-31

51

Anticipated climate change impacts on flood characteristics : Moisie River application  

International Nuclear Information System (INIS)

The issue of global warming was discussed with particular reference to the changes that may occur in the hydrological regime within the coming decades in response to predicted changes in climate. Flood events for the 2050 time horizon were investigated along with the consequences on water management and dam safety. Dams operated by Hydro-Quebec are used for flood control, water supply, recreational activities and hydroelectricity. As such, the electric utility relies on methods to evaluate the adaptability of current management plans to climate change. This paper presented the results of a study conducted at the Moisie River watershed, located in northern Quebec. The HSAMI hydrologic model was used to evaluate and compare the occurrences where stream flows and water levels exceed critical values in order to assess the effectiveness of management plans in both current and climate change scenarios. The study considered two different approaches on existing and future ...

52

The regional control of the canadian energy production; Le contraste provincial de la production energetique canadienne  

Energy Technology Data Exchange (ETDEWEB)

This document provides information and presents data on the energy situation in many regions of Canada. The first part deals with the petroleum and the bitumen shales of Alberta (reserves, exploitation and production, environmental impacts), the second part discusses with the hydroelectricity choice of Quebec and the 2004 crisis. The nuclear situation of Ontario is presented in the third part (nuclear park, programs, uranium reserves, research and development on Candu reactors), while the fourth part deals with the renewable energies (wind power and biomass). The canadian situation facing the Kyoto protocol is discussed in the last part. (A.L.B.)

2004-12-01

53

The effect of flue gas desulfurization availability on electric utilities. Volume II. Technical report. Final task report April--December 1977  

Science.gov (United States)

The report gives results of an analysis of the effect of the availability of a flue gas desulfurization system on the ability of an individual power plant to generate electricity at its rated capacity. (The availability of anything is the fraction of time it is capable of service, whether or not it is actually in service.) Also analyzed are its effects on a power generating system (a group of several coal-, oil-, and gas- fired power plants plus nuclear and hydroelectric plants).

1978-03-01

54

Technology transfer in the field of small hydroelectric power stations; Technologietransfer im Bereich Kleinwasserkraft  

Energy Technology Data Exchange (ETDEWEB)

The rate at which full-scale technology transfer takes place depends on the quality of the supply companies, i.e. training, organisational development and product infrastructure. These parameters are discussed for the example of a water mill, and a flow diagram is presented. [Deutsch] Wie rasch ein umfassender Transfer in Frage kommt, entscheidet sich mit der Qualitaet und dem Niveau der zuliefernden Betriebe. Hierbei sind Ausbildung, Organisationsentwicklung und Produktionsinfrastruktur besonders angesprochen. Fuer eine Wassermuehle werden diese Parameter konkret eroertert und an Durchlaufdiagrammen erlaeutert. (GL)

1997-12-31

55

Surveillance and control. A new edition of the BETCGB guidebook for the control of dams in exploitation; Surveillance et controle. Une nouvelle edition du guide du BETCGB pour le controle des barrages en exploitation  

Energy Technology Data Exchange (ETDEWEB)

The French office for technical studies and control of big dams (BETCGB), has recently reedited the `guidebook for the control of dams in exploitation`. The aim of this document is to provide to the regional directions of industry, research and environment (DRIRE) a methodological help for their control actions of hydroelectric dams granted for exploitation. It comprises 6 chapters dealing with: the different type of dams, the inspection, the surveillance, the floods evacuation, the flood instructions, and the particular emergency plans. (J.S.)

1998-12-31

56

Submarine 525 kV power transmission line for Vancouver island  

Energy Technology Data Exchange (ETDEWEB)

The studies undertaken by the B.C. Hydro company at the Canada showed that the existing system of hydroelectric power plants and transport cables will not be able to satisfy the increasing energy demand on the Vancouver island after 1985, and that the best solution will be the installation of a 525 kV transfer system from the continent. THe STK participated to the development and the immersion of this new system, the first in the world comprising submarine 525 kV transport parts. This paper presents the planning, the development, the submerging and the installation of two sections of submarine cable.

1985-01-01

57

High-tech hydro: an overview of pumped storage  

Science.gov (United States)

A growing number of pumped storage plants installed within the US brings attention to the increasing significance of pumped storage as a source of electrical generation capacity. Because of the special benefits this technology has to offer, hydroelectric pumped storage is an option that many utilities should consider for the supply of new capacity requirements. This article surveys the development and use of pumped storage in the US, and considers the potential for the future development of this technology. Although some of the problems that have occurred on recent projects highlight the role of pumped storage as a technological proving ground, the article puts forth the view that pumped storage is maturing to play a significant role in US electricity supply.

58

Environmental pollution abatement - data acqusition and evaluation by the accounting department. Umweltschutz - Erfassung und Auswertung im Rechnungswesen  

Energy Technology Data Exchange (ETDEWEB)

The booklet presents general information and practical hints for the task of acquiring and evaluating the data describing investments and other expenditure and activities for pollution abatement measures taken by electric utilities. The information is intended as an aid for establishing standard criteria for assignment and evaluation, and for comparison and classification of pollution abatement measures. As a line of orientation, a catalogue of pollution control measures is given, arranged into the following sections: Fossil-fueled power plants; nuclear power plants (BWR and PWR); hydroelectric power plants; power transmission and distribution. (HSCH)

1986-01-01

59

Energy balances of OECD countries 1970/1982  

Energy Technology Data Exchange (ETDEWEB)

The present volume provides standardized energy balance sheets expressed in a common unit of tons of oil equivalent for all OECD Countries. It covers the years 1970 to 1982 year by year and includes many revisions and additions to data previously published. The balances in the present volume are based on data published in OECD Energy Statistics 1971-1981 and OECD Energy Statistics 1981-1982. Tables for each OECD Country include production, import, export, consumption by the different industries, transportation, agriculture, residential sector of the different energies: solid fuels, petroleum, gas, nuclear power and hydroelectricity.

1984-01-01

60

Design standards No. 4: Electrical apparatus and systems. Chapter 1. General considerations for power, pumping, and pumped-storage plants. Final report  

Energy Technology Data Exchange (ETDEWEB)

The purpose of the chapter is to explain briefly the various considerations that enter into determining the general layout or arrangement of typical hydroelectric powerplants, pumping plants, and pumped-storage plants. Some of the important factors that affect or determine the location, type, and layout of the plant and the selection of the major items of equipment included in the installation are outlined in this chapter. The first consideration in the design of a powerplant, pumping plant, or pumped-storage plant is that it adequately perform its function and be structurally safe. The structure is also designed to give a pleasing architectural appearance.

1985-05-01

 
 
 
 
61

Consultations - Department of Energy and Climate Change  

Wastenet

... Areas of Consultation: All Areas About DECC Bioenergy Carbon capture & storage Carbon Reduction Commitment Climate Change Agreements CRC energy efficiency scheme Development, consents and planning reform Electricity Electricity network Emissions Emissions trading Energy markets Energy network Energy security Feed-in Tariffs Fuel poverty Funding and support Gas Governance Green Deal Hydroelectricity International climate change International energy Legislation Low-carbon Microgeneration News Nuclear Oil Renewable energy Saving energy and CO2 Site Wide Footer Smart ...

62

Checking the condion of 500 kV cable lines by chromatographic analysis of gases dissolved in oil  

Energy Technology Data Exchange (ETDEWEB)

A chromatographic technique is described for checking the condition of cable insulation by analyzing cable oil for the gases that are typical of defects in power transformers: carbon dioxide, acetylene, methane and ethylene. This technique was successfully used for predicting breakdown of insulation on KL-2 cable at one of the hydroelectric plants of Kirgizglavenergo power grid 1.5 months in advance. The presence of the above-mentioned gases in cable oil can provide a signal for monitoring the state of cable insulation. Further research is needed in addition to more operational experience to work out criteria for objective evaluation of the state of cable lines.

1980-03-01

63

500-kV cable lines  

Energy Technology Data Exchange (ETDEWEB)

A detailed description is given of the design, fabrication, and installation of oil-filled 500-kV cable lines used for the first time in the USSR for transmitting electric power from step-up transformers installed several meters from the hydroelectric generators to an outdoor distribution system or a junction point at which they are connected to overhead power transmission lines. These lines are 950 to 1050 m long and they are placed at levels differing by 45 m along the route. These lines can transmit power as great as 630 MV.A.

1980-01-01

64

Change in runoff characteristics of alpine flowing waters caused by the use of hydroelectric power and its effects on the macro-benthos  

International Nuclear Information System (INIS)

A typical form of change in runoff characteristics caused by the widespread use of hydroelectric power in Switzerland is the intermittent draining (torrent operation). It is the aim of the present work to help elucidate possible consequences of these changes in drain onto the benthobiocoenosis. The study was carried through on the Secklisbach at Oberrickenbach (in the semicanton of Nidwalden) and one of its side streamlets (800m above sea level). The macroinvertebrate coenosis was studied at four locations with similar conditions of drainage basin, population density and topography but varying in the degree of impairment to the draining. There were monthly benthos samples taken using a Surber sampling-device. Results show that the locations not only varied in drain, but also in temperature, this being a consequence of water storage by the power plant. The readings pointed out different values for the locations in daily average temperature, day amplitudes and ...

65

Using of Itaipu hydroelectric power plant-Brazil-electric power surplus for ammonia synthesis in nitrogen fertilizers production; Utilizacao da energia junto a Usina Hidreletrica de Itaipu para a sintese de amonia para fertilizantes nitrogenados  

Energy Technology Data Exchange (ETDEWEB)

Secondary energy can be described as a surplus of electrical energy in a hydropower because the lower demand of energy in some period of the day and the excess of water in the reservoir during the rainy periods. This study proposes the using of the excess of energy at Itaipu Bi nacional for electrolytically hydrogen production and ammonia for nitrogenous fertilizers. Ammonia is a raw material for nitrogenous fertilizers synthesis and produced using hydrogen and nitrogen from the atmosphere. This paper determines the minimal cost of hydrogen production and the capacity of hydrogen production, with this data and according the ammonia market for nitrogenous fertilizers in the Centre/South region was estimated the better capacity of ammonia production for one plant near Itaipu. The process of ammonia production using energy excess is the most environmental acceptable. (author)

2000-07-01

66

Understanding renewable energy systems  

Energy Technology Data Exchange (ETDEWEB)

Beginning with an overview of renewable energy sources including biomass, hydroelectricity, geothermal, tidal, wind and solar power, this book explores the fundamentals of different renewable energy systems. The main focus is on technologies with high development potential such as solar thermal systems, photovoltaics and wind power. This text not only describes technological aspects, but also deals consciously with problems of the energy industry. In this way, the topics are treated in a holistic manner, bringing together maths, engineering, climate studies and economics, and enabling readers to gain a broad understanding of renewable energy technologies and their potential. The book also contains a free CD-ROM resource, which includes a variety of specialist simulation software and detailed figures from the book. (Author)

2005-01-15

67

Report documents O M at pumped-storage plants  

Energy Technology Data Exchange (ETDEWEB)

The Electric Power Research Institute has published a report for planners, designers, owners, and operators of hydroelectric pumped-storage plants that records the operation and maintenance knowledge of 35 domestic and foreign pumped-storage projects. The report provides a comprehensive record of practices that have reduced forced outages and shortened scheduled repairs. As time passes and experienced staff retire at pumped-storage plants, many O M lessons are lost. To remedy that situation, EPRI commissioned Morrison-Knudsen Engineers Inc. to prepare a special report. The 348-page publication records the accumulated civil, geotechnical, mechanical, and electrical O M knowledge and experiences of pumped-storage plant staff. It also includes recommendations to planners and designers of future pumped-storage plants and concludes with descriptions of O M experiences reported by plant operators and utility representatives.

1991-12-01

68

Pumping up the volume  

Energy Technology Data Exchange (ETDEWEB)

Currently the construction of small-scale hydroelectric and pumped storage plants is booming in the USA. The technology is attractive because of its relatively cheap construction methods and operation. Electric utilities are seeing it as a viable source of peaking power and a means of system regulation. Two schemes are described. One is a high-head/small flow river project designed to generate 3.5 MW and is about to come on line having overcome tight environmental and commercial constraints. The second is a pumped-storage project using two man-made reservoirs with an average elevation difference of 1280 ft. It is deemed to be of minimum environmental impact construction and good physical characteristics. Completion is hoped for by 1995 and the plant will deliver 1000 MW. (UK)

1994-04-01

69

Project of the new measurement system for energy invoicing - Itaipu Hydroelectric Central; Proyecto del nuevo sistema de medicion de energia para facturacion de la Central Hidroelectrica de Itaipu  

Energy Technology Data Exchange (ETDEWEB)

Itaipu Binacional has taken a decision of executing a technological updating for the energy measurement system through the substitution of the current system by other one equipped with digital devices. The main reasons for that were the following: a) The equipment in operation were of an outdated generation b) The accuracy class of the existing equipment was of 0.5%, but the tendency for invoicing measurements was to install meters with accuracy class of 0.2% in the enterprises c) The requirements of ONS/MAE, in Brazil, which establishes the minimum requisites to be attended by invoicing measurement systems.

2001-07-01

70

Polymer Fuel Cells Challenge  

Wastenet

...Polymer Fuel Cells Challenge Publications News Events Login Register Search Content type All Web pages Case studies Publications News Video Home ...Buildings Carbon capture & storage Combined heat & power Electricity transmission & distribution Energy storage Fuel cells Geothermal Hydroelectric Hydrogen Industry Lighting Marine Metering Nuclear Solar Transport Wind ...Home Emerging technologies Current focus areas Polymer Fuel Cell Challenge Polymer Fuel Cells Challenge The objective of the Polymer Fuel Cells Challenge is to develop,...prove and commercialise novel polymer fuel cell technologies that have the potential to deliver a step-change in overall system cost. What are ...

71

Operation and maintenance experiences of pumped-storage plants  

Energy Technology Data Exchange (ETDEWEB)

This report presents the results of a study on Operation and Maintenance (O M) practices in hydroelectric pumped storage plants. The objective of this project, which was sponsored by EPRI, is to record the practical knowledge on the O M of a number of the domestic and foreign pumped storage plants which has been accumulated by their operating staff. Civil, geotechnical, mechanical and electrical aspects of O M of the thirty-five plants visited are discussed, and some general conclusions, as warranted by the commonality of the problems, are drawn. These conclusions may be useful to the planners and designers of future pumped storage projects. In general, due to their layout, diversity and different modes of operation, the plants have few common problems which, in most cases, are limited to the mechanical and electrical aspects of the plants' operation. The data on plants' specifications, operation and maintenance were collected during field trips ...

1991-05-01

72

Coatings for turbine rotors of Chinese hydropower plants. Final report; Anforderungsgerechte Beschichtung von Turbinenlaufraedern chinesischer Wasserkraftanlagen. Abschlussbericht  

Energy Technology Data Exchange (ETDEWEB)

The research project aimed at the selection or development of wear-reducing measures for submerged components of hydroelectric power plants. This comprised the optimisation of hydraulic profiles as well as materials testing for abrasion and cavitation. Another field of research was the development of appropriate application processes. (orig.) [German] Das Hauptziel des Forschungsvorhabens bestand in der Auswahl bzw. Entwicklung geeigneter Schutzmassnahmen zur Verschleissminderung an wasserberuehrten Komponenten von Wasserkraftanlagen. Diesem Ziel untergeordnet waren neben der Optimierung hydraulischer Profile auch Materialuntersuchungen hinsichtlich Verschleissbestaendigkeit gegenueber Abrasion und Kavitation. Ebenso war die Entwicklung geeigneter Applikationsprozesse ein wichtiger Bestandteil der Aufgabenstellung. (orig.)

2002-07-01

73

Bidding strategy for pumped-storage plant in pool-based electricity market  

Energy Technology Data Exchange (ETDEWEB)

This paper develops optimal bidding strategies for a pumped-storage plant in a pool-based electricity market. In the competitive regime, when compared to simple hydroelectric generator, profit of the pumped-storage plant is maximized by operating it as a generator when market clearing price is high and as a pump when the price is low. Based on forecasted hourly market clearing price, a multistage looping algorithm to maximize the profit of a pumped-storage plant is developed, considering both the spinning and non-spinning reserve bids and meeting the technical operating constraints of the plant. The proposed model is adaptive for the nonlinear three-dimensional relationship between the power produced, the energy stored, and the head of the associated reservoir. Different operating cycles for a realistic pumped-storage plant are considered and simulation results are reported and compared. (author)

2010-03-15

74

Acid pre-hydrolysis of biomass as a preparation process for its utilization as thermoelectric power plants fuel; Pre-hidrolise acida da biomassa como preparacao de combustivel para termoeletrica  

Energy Technology Data Exchange (ETDEWEB)

It is described a process of production of celulignin from biomass through acid pre-hydrolysis in continuous reactor made of advanced materials such as niobium, titanium and monel. The celulignin is a fuel of 28.50 MJ/kg of heating power. The utilization of this technology together with eucalyptus reforestation by vegetative propagation and high efficiency thermoelectric plant (triple cycle of steam turbine, gas turbine and MHD electrical generation) allow electric power production with competitive cost when compared to hydroelectric power. (author). 1 ref. 5 figs., 2 tabs

1990-12-31

75

The Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP). Rationale, concept, realisation  

Energy Technology Data Exchange (ETDEWEB)

Back in 1985 it was the European Commission's intention to demonstrate on rather large scale the provision of clean and renewable energy with hydrogen as energy vector and fuel. The cheapest and technologically available form of renewable electricity, the primary energy for electrolytic hydrogen, is hydropower. Most of the hydroenergy sources are oversea's. The World's topologically and technically exploitable hydroenergy potential is estimated to be in the order of 20.10{sup 3} TWh/y, i.e. 0.0057% of the hydraulic cycle energy. Today's hydroelectricity generation is {approx}2500 TWh/y i.e. {approx}21% of the World's electricity generation. Quebec's installed hydroelectricity is 33.5 GW, its residual potential is 50 GW or 190 TWh/y and 285 TWh/y, respectively (load factor 0.65). The construction of hydropower installation is rather clean. The construction of La Grande at James Bay with an ...

1998-07-01

76

Modern concept for ethanol distilleries: maximization of the electricity surplus  

Energy Technology Data Exchange (ETDEWEB)

Once again Brazil faces the possibility of an electricity shortage in the near future. The low level of rain and the consequent reduction of hydroelectric reservoirs (hydroelectric energy represents almost 80% the total Brazilian electricity generation) led to the dispatch of thermal plants based on natural gas and/or fuel oil. However, the recent crisis regarding the Bolivian natural gas supply to Brazil increased the risk of a shortage of this energy source. Hence, the uncertainty of the electricity supply scenario is pushing the electricity prices up in the near future. A possible alternative to increase the electricity supply is the maximization of the electricity surplus in sugarcane mills. Back in 1970's and 1980's, cogeneration plants in sugarcane mills were primarily designed to consume all bagasse, and produce steam and electricity to the process. The plants used medium pressure steam boilers (21 bar and 300 deg C) ...

2008-07-01

77

Hydroelectric power stations. Planning, construction and operation; 2. rev. ed.; Wasserkraftanlagen. Planung, Bau und Betrieb  

Energy Technology Data Exchange (ETDEWEB)

Water power plants mean the design, configuration, execution and operation of buildings and of hydraulic and electrical machines. Their many types are due to the stages of development and the technical alternatives of the use of waterpower and the associated energy economy aspects. The main points of this work are the use of water power, different hydro-electric powerstations, water collection, machines and electrotechnical equipment. In the 2nd revised edition parts on electrical engineering, environment, minimum water run-off pumped storage plants, small scole plants, economical aspects and finite elements were broadened. It is a comprehensive textbook and technical book for students of civil engineering and particularly suitable for engineers active in the theory and practice of waterpower construction. (orig./GL) [Deutsch] Wasserkraftanlagen bedeuten Planung, Gestaltung, Ausfuehrung und Betrieb von Bauwerken und hydraulischen sowie elektrischen Maschinen. Ihre ...

1998-12-01

78

Hydroelectric power stations. Planning, construction and operation. 4. upd. and enl. ed.; Wasserkraftanlagen. Planung, Bau und Betrieb  

Energy Technology Data Exchange (ETDEWEB)

Water power plants mean the design, configuration, execution and operation of buildings and of hydraulic and electrical machines. Their many types are due to the stages of development and the technical alternatives of the use of waterpower and the associated energy economy aspects. The main points of this work are the use of water power, different hydro-electric powerstations, water collection, machines and electrotechnical equipment. In the 2nd revised edition parts on electrical engineering, environment, minimum water run-off pumped storage plants, small scole plants, economical aspects and finite elements were broadened. It is a comprehensive textbook and technical book for students of civil engineering and particularly suitable for engineers active in the theory and practice of waterpower construction. (orig./GL) [German] Dieses Standardwerk der Wasserkraft liegt hiermit bereits in 4. Auflage vor. Es wurde noch staerker an die Erfordernisse der Praxis ...

2005-07-01

79

Hydroelectric power in Switzerland: large growth potential by increasing the installed power; L'hydraulique suisse: un grand potentiel de croissance par l'augmentation de la puissance  

Energy Technology Data Exchange (ETDEWEB)

Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates ...

2007-07-01

80

Variable-speed generation enhances hydro operation  

Energy Technology Data Exchange (ETDEWEB)

Two major developments have given impetus to wider adoption of variable-speed turbine/generators in hydroelectric plants, both essentially environmental: (1) the need for stream-bed stability below river dams, and (2) the need to minimize fish damage. Also, the need to stabilize pumped-storage and generating efficiencies to match extreme changes in head levels has been a driving force. Variable-speed operation in hydro applications is relatively new to North America. In other parts of the world, it has been used in pumped-storage plants since 1971. In the US, and increasing potential exists for variable-speed hydro, considering the 30 pumped-storage plants already in operation and several river plants struggling with high head fluctuations--including four at stations operated by the Bonneville Power Administration. Several modifications to hydro-plant hardware and operating procedures are actively being considered at Bonneville--all of them practical but costly. ...

1993-07-01

 
 
 
 
81

Utility applications program. Annual report for 1981  

Energy Technology Data Exchange (ETDEWEB)

The purpose of the Utility Applications Program is to provide information and assistance to interested utilities on central station energy storage systems. Compressed air and underground pumped hydroelectric energy storage are the primary technical focus. Smaller utilities are the primary targets of this program, as they may not have resources to track and utilize new energy conservation developments. The program, initiated during this year-long period, consists of a series of tasks integrating and supporting energy storage implementation. Program management and technical coordination activities monitor the wide range of research ongoing both under government support and in industry and provide a locus for dissemination of results. Recently completed DOE demonstration studies provide the central data base and the DOE CAES and UPH Technology Program activities provide another major resource. In addition a UPH preliminary feasibility study in coorination with Central ...

1982-06-01

82

The world's hydro resources  

Energy Technology Data Exchange (ETDEWEB)

Our latest survey of hydro resources demonstrates the significant role that hydroelectric power continues to play in world energy supply. Our statistics have been revised, updated and expanded this year (1992) on the basis of a detailed questionnaire sent to power authorities around the world. For cases where data could not be obtained in this way we have collaborated with the World Energy Council, the United Nations and OLADE. The four tables this year give data by country and geographical region for the following: 1. Hydropower potential: a detailed breakdown of gross theoretical, technically feasible and economically feasible hydro potential, as well as the dates when the figures were last evaluated. 2. Hydro capacity in operation, under construction and planned (pure hydro only excluding contributions derived from pumped storage). 3. Hydropower ownership: data on public versus independent producers. 4. Pumped-storage plants: in operation, under construction, ...

1992-08-01

83

Probabilistic power generation planning with environmental consideration for Lebanon  

International Nuclear Information System (INIS)

Full text.This paper describes a software tool for generation expansion planning based on dynamic programming, probabilistic production simulation, and environmental assessment. The aim is to determine the units needed to expand a given system in order to minimize either the cost or the environmental impact or some weighed function of the two. The problem of generation expansion planning is solved in stages using Tunnel Dynamic Programming (TDP) with Heuristic rules to limit the number of options analyzed. The production costing methodology is based on combining a probabilistic generation model known as the capacity outage table (COT) with the load duration curve (LDC) of the system to deduce a risk model from which the expected energy not supplied (EENS) is estimated. The generation model is built recursively using an efficient numerical convolution procedure and is combined at each step with the LDC to calculate the expected energy produced by each unit, its corresponding production ...

2000-11-23

84

Measurement techniques and measurement opportunities on the spot; Messverfahren und -moeglichkeiten Vorort  

Energy Technology Data Exchange (ETDEWEB)

Verification of guarantees mostly calls for measurements on the spot. The paper deals with the guarantees that apply to small hydroelectric power stations. Already when planning a plant it should be decided what guarantees are to be demanded and how they can be verified. Specifically, measurements to verify guaranteed performance and efficiency on the spot are dealt with. Details are not given. Rather, the report wants to give an overview of methods and aspects to be taken heed of. For in-depth information, the reader is referred to the corresponding standards and guidelines. (orig.) [Deutsch] Zur Ueberpruefung von Garantien ist meistens die Durchfuehrung von Messungen vorort notwendig. Es werden die Garantien behandelt, die bei Kleinwasserkraftanlagen in Frage kommen. Bereits bei der Planung der Anlage sollte entschieden werden, welche Garantien gefordert werden sollen und wie sie ueberprueft werden koennen. Es wird speziell auf die messtechnische Ueberpruefung ...

1997-12-31

85

Increased heterozygosity at the Mdh-B locus in fish inhabiting a rapidly fluctuating thermal environment  

Science.gov (United States)

Populations of a common forage fish, red shiner Notropis lutrensis, were sampled from four localities on the Brazos River, Texas, affected by cold-water discharge from a hydroelectric dam and from unaltered sites in the same region. Polymorphism at the Mdh-B locus, encoding supernatant malate dehydrogenase, indicates that populations within 57 km of the dam are distinctive from other regional populations and possess a unique Mdh-B allele, have significantly higher levels of heterozygosity at the Mdh-B locus, represent a homogeneous set that have significantly different Mdh-B zygotic frequencies from other regional populations, and have significantly different Mdh-B zygotic proportions than would be expected under a Hardy-Weinberg equilibrium. Increased levels of heterozygosity in fish within 57 km of the dam were correlated with discharge-associated fluctuations in water temperature at sampling stations.

1981-05-01

86

Hydroelectric power - energy at no cost at all; Wasserkraft - Strom, der vom Himmel faellt  

Energy Technology Data Exchange (ETDEWEB)

The harnessing and enhanced use of renewable energy today is a matter of lively debate and much concern. Amazingly, hydro power is either rarely considered in these discussions or viewed in a negative light. But hydro power continues to be the most important source of renewable energy, and its use potential is considerable and should be taken into account when, for instance, agreeing on or implementing carbon dioxide reduction targets. Small hydro power stations are an effective means of harnessing existing energy potentials. (orig.) [Deutsch] Ueber die Nutzung und den Ausbau regenerativer Energien wird heutzutage lebhaft diskutiert und gerungen. Es mag erstaunen, dass in diesen Diskussionen die Wasserkraft kaum Beachtung findet oder in einem schlechten Licht gesehen wird. Dabei ist die Wasserkraft nach wie vor bei weitem die wichtigsten Quelle regenerativer Energie, und sie besitzt ein beachtliches Ausbaupotential, das man wenigstens ins Kalkuel ziehen sollte, wenn es etwa darum geht, ...

1997-12-31

87

Generalized simulation model for reservoir system analysis. Technical paper  

Energy Technology Data Exchange (ETDEWEB)

This paper overviews the general features of computer program 'HEC-5, Simulation of Flood Control and Conservation Systems', with emphasis on the capabilities of the most recent release of HEC-5, Version 7.2, dated March 1991. HEC-5 can simulate the essential features and operation goals and constraints of simple or complex systems with simulation intervals ranging from minutes to one month. Single event flood analysis and period of record conservation analysis may be accomplished with the model. Flood control analysis includes balanced system operation for downstream damage centers with consideration of forecasted local flows and hydrologic routing. In addition, induced surcharge operation based on spillway gate regulation schedules can be simulated. Hydropower analysis may include run-of-river, peaking, and pumped storage plants as well as system power operation. Water supply simulation can include reservoir and downstream flow requirements in addition to divers ...

1992-03-01

88

Diagnosing mechanical changes: A test of the machine condition monitoring concept  

Energy Technology Data Exchange (ETDEWEB)

BC Hydro recently conducted a demonstration test of a bearing condition monitor. The test, at the 529-MW Kootenay Canal project, proved the ability of the monitor to detect machine condition faults. The capability to detect changing conditions during normal operation of hydroelectric machines gives hydro plant owners the opportunity to anticipate needed maintenance and ultimately to reduce the number of equipment failures. BC Hydro intends to install bearing condition monitors, as well as windings monitors, brushgear monitors, environmental monitors, and other selected systems in as many as 46 of its hydro generators. BC Hydro analyzed forced outages between 1985 and 1989 in its hydro system to identify which parts of a generating unit resulted in the highest number of hours of outage. From there, the utility has formulated a concept for a machine condition monitoring system. To keep the system cost effective, it will be developed in modules. In this way, users can ...

1993-05-01

89

Demonstration test of power system stabilizer employing fuzzy theory; Fuzzy riron wo tekiyoshita keito anteika sochi o jissho shiken hokoku  

Energy Technology Data Exchange (ETDEWEB)

The demonstration test of a power system stabilizer, employing a fuzzy theory, in the two hydroelectric power stations of Kyusyu Electric Power Co., Inc. is described. The PSS inputs auxiliary signals to the automatic voltage regulator (AVR) of a generator and generates an electric torque in the direction opposite to the operating direction of a generator to enhance the damping effect and improve the system stability. Usually, the change in the slide information of a generator is detected, and the phase adjustment is performed so that the damping is the optimum value. However, since the damping is optimized in the specific system state, no complete damping may be obtained when the system state is changed. A fuzzy theory was thus applied for the control operation part. In a secondary fuzzy PSS, the velocity and acceleration were calculated from the slide information of a generator to produce a control signal. In the third dimension, moreover, the position (integral ...

1997-03-01

90

Consequences of power peak production on sediments in tunnels and surge shafts. Partial report Phase 1: Field investigations; Konsekvenser av effektkjoering paa sedimentforhold i tunneler og svingesjakter. Delrapport fase 1: Feltundersoekelser  

Energy Technology Data Exchange (ETDEWEB)

In July 1997, a field inspection was carried out of parts of the tunnel system of the Tonstad hydroelectric power station, Norway. This report discusses the findings: (1) The main drift has a varying bottom covering of sediments, (2) The tunnel to Ousdal had on its downmost 2 km an almost unbroken and apparently stable armour layer along the walls and an unstable or incomplete armour layer in the middle, (3) The tunnel to Homstoel almost had no bottom layer, (3) Sediments in side inlets and niches are of two kinds: (a) masses added through side inlets, (b) fine sand and mud deposited by the main tunnel, (4) A few cases were observed of downfallen rocks and of peeled rock of about 1 m size. It looks as if the Homstoel tunnel may have been previously used for larger discharges than that from Ousdal and that the latter is now being used to the limit of what the previously established armour layer can stand

1997-10-01

91

Conforth Ranch Wildlife Mitigation Feasibility Study, McNary, Oregon : Annual Report.  

Energy Technology Data Exchange (ETDEWEB)

The 2,860-acre Conforth Ranch near Umatilla, Oregon is being considered for acquisition and management to partially mitigate wildlife losses associated with McNary Hydroelectric Project. The Habitat Evaluation Procedures (HEP) estimated that management for wildlife would result in habitat unit gains of 519 for meadowlark, 420 for quail, 431 for mallard, 466 for Canada goose, 405 for mink, 49 for downy woodpecker, 172 for yellow warbler, and 34 for spotted sandpiper. This amounts to a total combined gain of 2,495 habitat units -- a 110 percent increase over the existing values for these species combined of 2,274 habitat units. Current water delivery costs, estimated at $50,000 per year, are expected to increase to $125,000 per year. A survey of local interest indicated a majority of respondents favored the concept with a minority opposed. No contaminants that would preclude the Fish and Wildlife Service from agreeing to accept the property were identified. 21 refs., ...

1991-03-01

92

Behavior of ice covers subjected to large daily flow and level fluctuations  

Energy Technology Data Exchange (ETDEWEB)

The stability of a solid ice cover subjected to rapidly varying water levels and discharge was investigated. The support from the bank limits the stress in the ice cover and consequently bank contact must be maintained to ensure ice cover stability. An analysis was required of the stability of ice hinges, a flexible connection between a solid ice cover and the riverbank. Phase II and phase III of the research involved a field study of the Peace River, investigating the evolution of ice hinges with water level variation, from initial ice cover cracking parallel to the banks, to a fully developed hinge. A test program of midwinter discharge variations was undertaken to gather specific data and measurements of ice hinge link length, ice thickness, hinge joint behavior, riverbank geometry, and response of ice hinging to water level variation. As a result of the program, concepts developed throughout the study were confirmed, preliminary guidelines for hydroelectric ...

1984-11-01

93

TAG Oil hunting elephants in New Zealand  

International Nuclear Information System (INIS)

Calgary-based TAG Oil is an exploration company that manages 4.1 million acres of major producing oil and gas fields in New Zealand. The enormous Maui field, with 4 tcf of natural gas in place, has dominated the gas market in New Zealand by meeting nearly 90 per cent of the country's energy demand at costs much lower than world prices. However, the maturing field is in decline and will cease production by 2008. New gas field discoveries will only meet 60 per cent of the country's energy requirements for 5 additional years. Unless new large reserves of gas are discovered, the supply and demand situation will get worse. Lead time to place new production on-stream requires 5 to 10 years, which creates a large supply gap over the next decade. Public resistance to coal-fired power plants, new hydroelectric dams and nuclear power has left the country with no viable alternative to natural gas. TAG Oil has taken this unique opportunity to create value when gas demand is at ...

2005-10-01

94

Software for production scheduling in hydro systems  

Energy Technology Data Exchange (ETDEWEB)

The report presents an integrated software system developed at the Norwegian Electric Power Research Institute (EFI), for production scheduling, maintenance handling, network security analysis, inflow forecasting, and load forecasting. The integrated software is being developed with focus on hydro-dominated power supply systems. In specific terms it is expected that application of the software will improve the operational decisions, and make the planning process more effective. The optimal scheduling of hydro resources poses severe computational problems in system operations planning. This necessitates problem decomposition. In the EFI approach, planning is split into three main levels: long-term, mid-term and short-term planning. The long-term planning aims at evaluating the seasonal and pluriannual handling of regional storages in view of firm power supply obligations, inflow statistics, main hydraulic and electric transit limitations, and the available options of substituting other ...

1991-02-01

95

Quantitative risk assessment using the capacity-demand analysis  

Energy Technology Data Exchange (ETDEWEB)

The hydroelectric industry's recognition of the importance of avoiding unexpected failure, or forced outages, led to the development of probabilistic, or risk-based, methods in order to attempt to quantify exposures. Traditionally, such analysis has been carried out by qualitative assessments, relying on experience and sound engineering judgment to determine the optimum time to maintain, repair or replace a part or system. Depending on the nature of the problem, however, and the level of experience of those included in the decision making process, it is difficult to find a balance between acting proactively and accepting some amount of risk. The development of a practical means for establishing the probability of failure of any part or system, based on the determination of the statistical distribution of engineering properties such as acting stresses, is discussed. The capacity-demand analysis methodology, coupled with probablistic, risk-based analysis, ...

1999-07-01

96

Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association  

Energy Technology Data Exchange (ETDEWEB)

The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam ...

1999-07-01

97

Lower Flathead System Fisheries Study, Executive Summary, Volume I, 1983-1987 Final Report.  

Energy Technology Data Exchange (ETDEWEB)

This Executive Summary, Volume I, of the lower Flathead System Fisheries Study Final Report, was prepared to provide a study overview for persons who are not fisheries scientists. The contents provide an introduction to the study and its objectives, a short description of the study area, a discussion of the major findings and conclusions of the study, and the description of fisheries management alternatives available to managers of the lower Flathead system. Technical reports were prepared for those portions of the study dealing with the lower Flathead River and its tributaries, Volume II, and the South Bay of Flathead Lake, Volume III. The annual hydrographic regime of the Flathead system, consisting of upper rivers, lake and lower river, has been modified by the construction and operation of two major hydroelectric facilities, Hungry Horse Dam on the south fork Flathead River and Kerr Dam at the outlet of Flathead Lake. The modified hydrographic regime has ...

1988-06-01

98

Hydrogeologic investigations related to seepage and instability phenomena within and adjacent the earth structures at Grand Rapids Generating Station, Manitoba  

Energy Technology Data Exchange (ETDEWEB)

This study evaluated potential hydrogeologic mechanisms that may account for increasing moisture content conditions within the sediments of hydroelectric earth dams. Many such dams in Canada are reaching their life spans of approximately 40 years, therefore this study is considered to be an important and timely undertaking. The objective was to develop a method to numerically assess transient groundwater flow processes within old earth structures. The focus of this study was central Manitoba's Grand Rapids Generating Station where progressive movement within the till overburden has been observed since 1977. The possible source of water which is causing higher moisture content and weakness in the overburden material may be the slow wetting-up of the core and progressive increase in seepage to the downstream side. The evolution of flow through the core was evaluated with a modelling program called FRAC3D-VS which accounts for transient groundwater flow under ...

2002-07-01

99

From Daya Bay to Ling Ao. The benefits of a duplication policy  

International Nuclear Information System (INIS)

Over the past 15 years, the People's Republic of China has experienced very rapid economic growth of annual average 8%, which must be supported by fast expanding energy production, notably of electricity. China has the considerable amount of coal resources, but most of these resources are located in the north of the country, and the vast hydroelectric potential in Southwestern China is difficult to develop. Therefore, in the coastal provinces of Southeast China, where economic expansion is greatest, nuclear power has been chosen to meet the need. The Qinshan No. 1 PWR with 300 MWe output is the first Chinese nuclear power facility, and started the operation in 1992. Two 985 MWe PWRs have been operated since 1994 at Daya Bay. The construction of Qinshan No. 2 and 3 PWRs of 600 MWe each are in progress, and are expected to start the operation in 2001. These plants were designed by China based on the Framatome technology. Two more 985 MWe plants will be constructed on ...

1996-10-01

100

Energy Nation Norway. Development and renewal in a new environmental and geopolitical era. Summary; KonKraft rapport 1  

Energy Technology Data Exchange (ETDEWEB)

'Energy Nation Norway' looks at Norway as an energy nation from both a national and an international perspective. Its purpose is to provide a basis for political and industrial decisions relating to the petroleum industry. The report is particular concerned with the petroleum sector, besides considering the Norwegian energy cluster from a broader perspective. The energy cluster has been and will continue to be a crucial vehicle for economic growth and the development of wealth in Norway. These are the report's main conclusions: The petroleum industry has played a significant part in Norway's economic development, the side-effects of which have benefited the country's entire population. The world's economic growth and wealth development require energy. In the next few decades oil and gas will continue to form a large part of the world's energy consumption. Norway has great opportunities and competitive advantages over other ...

2008-07-01

 
 
 
 
101

ASTEC and MELCOR comparison for a VVER-1000 60 mm small break LOCA  

International Nuclear Information System (INIS)

In this paper a comparison between severe accident calculations performed for a WWER 1000 with the ASTEC1.1v0 and MELCOR 1.8.5 computer codes for a small break LOCA (ID 60 mm) without intervention of hydro accumulators is presented. This investigation has been performed in the framework of the SARNET project under the EURATOM 6th framework program. Once the accident sequence scenario is specified, both codes (MELCORE and ASTEC) are able to determine the core and containment damaged states, to estimate the release of radionuclides from the fuel as well as from the primary circuit and containment. Theses results are used to estimate the maximum period of the time during which the personnel could still take particular decisions in order to mitigate such an accident. The aim of the performed analysis is to estimate the discrepancy between ASTEC and MELCORE 1.8.5 calculations. Such discrepancies will be studied, if the case, proposal for ASTEC improvements will be made. Also the ASTEC ...

2005-06-08

102

IEA Statistics 1993: electricity information  

International Nuclear Information System (INIS)

Gross electricity production in 1993 in the OECD (including generation from pumped storage plants) was 7 466 TWh, a rise of 1.2 per cent from the level of gross production in 1992 (Tables 1 and 3). Nuclear plants accounted for 24.2 per cent of total gross electricity production in 1993, hydroelectric plants 16.7 per cent, total thermal plants 58.7 per cent and geothermal and other renewables 0.4 per cent. In 1992 total OECD heat production that is sold to third parties by public producers was 25 Mtoe (Table 6). About 86 per cent of this heat (21.6 Mtoe) was produced in CHP plants, about 12 per cent (3.1 Mtoe) in heat plants, and the remainder (0.3 Mtoe) in nuclear power plants (in Canada and Switzerland only). Based on preliminary data, apparent consumption of electricity (gross production plus imports less exports) in 1993 in OECD was 7 474 TWh. The corresponding figure for 1992 was 7 379 TWh, indicating a rise of 1.3 per cent in apparent electricity consumption ...

1993-01-01

103

Kokanee Stocking and Monitoring, Flathead Lake, 1993-1994 Annual Report.  

Energy Technology Data Exchange (ETDEWEB)

One mitigation goal of the Hungry Horse Dam fisheries mitigation program, funded by the Bonneville Power Administration, is to replace lost production of 100,000 adult kokanee in Flathead Lake. The mitigation program calls for a five-year test to determine if kokanee can be reestablished in Flathead Lake. The test consists. of annual stocking of one million hatchery-raised yearling kokanee. There are three benchmarks for judging the success of the kokanee reintroduction effort: (1) Post-stocking survival of 30 percent of planted kokanee one year after stocking; (2) Yearling to adult survival of 10 percent (100,000 adult salmon); (3) Annual kokanee harvest of 50,000 or more fish per year by 1998, with an average length of 11 inches or longer for harvested fish, and fishing pressure of 100,000 angler hours or more. Kokanee were the primary sport fish species in the Flathead Lake fishery in the early 1900s, and up until the late 1980s when the population rapidly declined in numbers and ...

1995-07-01

104

Ecological response of a multi-purpose river development project using macro-invertebrates richness and fish habitat value  

International Nuclear Information System (INIS)

It has been acknowledged that river morphology and hydrology have been intensively altered due to the anthropic demands in floodplain land use and management, flood protection, promotion of navigability or energy production. Rivers were transformed in water highways, having lost contact with their surrounding floodplain as well as the plethora of ecological processes and occupants once thriving in these ecotonal zones. The identification of this emerging threat of morphological and hydrological alteration on ecological integrity adds further complexity in the exploitation of hydrosystem resources. These resources are heavily coveted and guarded by different lobbies each having strategic views on future project development. Stakeholders may want to promote hydro-electricity, ecologists a natural reserve, communes may wish to have an increased flood protection and leisure promoters a nautical center. As a result, the proposition of a river development project is ...

2002-04-01