Physicists grouped around a screen in the LEP control room at the strat-up of LEP on 14 July 1989. The emotion of the moment is clear. Carlo Rubbia, Director-General of CERN at the time, is in the centre and on his left, Herwig Schopper, former Director-General of the Organization.
One of the requirements for a federated information system is interoperability, the ability of one computer system to access and use the resources of another system. This feature is particularly important in biomedical research systems, which need to coordinate a variety of disparate types of data. In order to meet this need, the National Cancer Institute Center for Bioinformatics (NCICB) has created the cancer Common Ontologic Representation Environment (caCORE), an interoperability infrastructure based on Model Driven Architecture. The caCORE infrastructure provides a mechanism to create interoperable biomedical information systems. Systems built using the caCORE paradigm address both aspects of interoperability: the ability to access data (syntactic interoperability) and understand the data once retrieved (semantic interoperability). This infrastructure consists of an integrated set of three major components: a controlled terminology service (Enterprise Vocabulary Services), a ...
A critical factor in the advancement of biomedical research is the ease with which data can be integrated, redistributed and analyzed both within and across domains. This paper summarizes the Biomedical Information Core Infrastructure built by National Cancer Institute Center for Bioinformatics in America (NCICB). The main product from the Core Infrastructure is caCORE--cancer Common Ontologic Reference Environment, which is the infrastructure backbone supporting data management and application development at NCICB. The paper explains the structure and function of caCORE: (1) Enterprise Vocabulary Services (EVS). They provide controlled vocabulary, dictionary and thesaurus services, and EVS produces the NCI Thesaurus and the NCI Metathesaurus; (2) The Cancer Data Standards Repository (caDSR). It provides a metadata registry for common data elements. (3) Cancer Bioinformatics Infrastructure Objects (caBIO). They provide Java, Simple Object Access Protocol and HTTP-XML application ...
The original plan for support of research in geothermal reservoir engineering, GREMP, is reviewed and compared with accomplishments to date. A commentary on the comparison and an updated plan are presented. Also included are a justification of the updated plan and a revised management plan. (MHR)
This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams.
This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.
...2010-10-01 false Information technology security plan and accreditation...Clauses 1252.239-71 Information technology security plan and accreditation...following provision: Information Technology Security Plan and...
A method is proposed for evaluating reliability of planning and calculation of the reliability factor with current planning of open pit mining operations. For a quantitative evaluation of the reliability of fulfilling the planned assignment, laws were defined for distribution of the quality characteristics of the coal. After establishing that coal ash content follows the normal distribution law, the probability was defined that the actual output of coal is greater or equal to the planned. Calculation of the factor of reliability of the current planning of open mining operations makes it possible to determine the optimum planning for this period and the probability of fulfillment of the planned assignments. The technique of planning with regard for reliability makes it possible to select the most reliable variant of the ...
This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.
In this work an analysis of the influence of the choice of the algorithm or planning system, on the calculus of the same treatment plan is introduced. For this purpose specific software has been developed for comparing plans of a series of IMRT cases of prostate and head and neck cancer calculated using the convolution, superposition and fast superposition algorithms implemented in the XiO 4.40 planning system (CMS). It has also been used for the comparison of the same treatment plan for lung pathology calculated in XiO with the mentioned algorithms, and calculated in the Plan 4.1 planning system (Brainlab) using its pencil beam algorithm. Differences in dose among the treatment plans have been quantified using a set of metrics. The recommendation for the dosimetrist of a careful choice of the algorithm has been ...
Key elements in strategic planning in the nonferrous mining industry are discussed. Included are price forecasting, financial planning, government relations, research and development, and exploration. Financial planning is discussed in terms of 1) forecasting of earnings, 2) investment policy and 3) tax planning. Costs of environmental liabilities are expected to have a major impact on the industry. (JMT)
The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.).
This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required.
...false Additional requirements for health plans. 162.925 Section 162.925 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE...925 Additional requirements for health plans. (a) General rules....
This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.
Abstract The authors provide a survey of how images are used in radiation therapy to improve the precision of radiation therapy plans, and delivery of radiation treatment. In contrast...Full Text Available
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different ...
Federal regulators were set to vote on a plan to protect deep water corals and other sensitive fish habitats that will likely include a permanent ban on ...
A brief article considers the possible result of the enquiry into Nirex`s plan to build an underground rock laboratory at Sellafield in relation to radioactive waste disposal in the UK. (UK).
In the National Water Plan it is described which measures must be taken to keep the Netherlands safe and livable for future generations and to make use of the chances offered by water.
The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF.
The document presented defines the plan to be used to coordinate the preparation, review, approval, and issuance of the operating procedure documents required to ensure safe and efficient operation of FFTF.
This data layer consists of polygons representing harvest area boundaries from Timber Harvest Plans approved by the California Department of Forestry ... ...
Implementation of a plan to charge waste management costs to the facility that generates such waste requires a long-term commitment and consistent administration. The benefit is that generators are provided the incentive to optimize waste management practices if the charges are appropriately applied. This paper summarizes (1) a plan to charge waste generators, (2) the administrative structure of the plan, (3) a comparison between the rate structure and changes in waste disposal operations, and (4) issues that have surfaced as the plan is implemented. 2 refs., 1 fig., 1 tab.
This Maintenance Implementation Plan has been developed for maintenance functions associated with the Waste Sampling and Characterization Facility (WSCF). This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4A guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at WSCF.
The purpose of the Hanford Waste Management Plan (HWMP) is to provide an integrated plan for the safe storage, interim management, and disposal of existing waste sites and current and future waste streams at the Hanford Site. The emphasis of this plan is, however, on the disposal of Hanford Site waste. The plans presented in the HWMP are consistent with the preferred alternative which is based on consideration of comments received from the public and agencies on the draft Hanford Defense Waste Environmental Impact Statement (HDW-EIS). Low-level waste was not included in the draft HDW-EIS whereas it is included in this plan. The preferred alternative includes disposal of double-shell tank waste, retrievably stored and newly generated TRU waste, one pre-1970 TRU solid waste site near the Columbia River and encapsulated cesium and strontium waste.
This report describes a quality assurance program plan for the Yucca Mountain Project. Aspects of the plan include: document control, equipment maintenance and calibration, process control, audits, computer software, and inspections. (CBS)
This paper describes the deliverables framework developed by Vanderbilt University Medical Center (VUMC) in its IAIMS planning process. The key deliverables include: visions for the future; mission,...Full Text Available
This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.
Four-dimensional (4D) radiotherapy is the explicit inclusion of the temporal changes in anatomy during the imaging, planning, and delivery of radiotherapy. One key component of 4D radiotherapy planning...Full Text Available
This plan describes the Quality Assurance Program which will be applied to spent fuel handling and packaging tests conducted at the Area 25 E-MAD facility, Nevada Test Site (NTS).
This report gives an overview of KIDS (Kestrel Interactive Development System). We describe a program derived with KIDS to solve the Missionaries and Cannibals problem (MC PROBLEM), a classical AI planning problem. Our interest in this problem arose as th...
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning mi...
ObjectivesTo describe the plans of English NHS hospitals to implement ePrescribing systems.Design and settingQuestionnaire-based survey of attendees...Full Text Available
Adaptive radiation therapy (ART) is the incorporation of daily images in the radiotherapy treatment process so that the treatment plan can be evaluated and modified to maximize the amount of radiation...Full Text Available
This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).
Given the high prevalence of overweight and low levels of physical activity among children, a better understanding of physical activity behaviour is an important step in intervention planning. This...Full Text Available
Megavoltage photon intensity-modulated radiation therapy (IMRT) is typically used in the treatment of prostate cancer at our institution. Approximately 1% to 2% of patients with prostate cancer have hip prostheses. The presence of the prosthesis usually complicates the planning process because of dose perturbation around the prosthesis, radiation attenuation through the prosthesis, and the introduction of computed tomography artifacts in the planning volume. In addition, hip prostheses are typically made of materials of high atomic number, which add uncertainty to the dosimetry of the prostate and critical organs in the planning volume. When the prosthesis is bilateral, treatment planning is further complicated because only a limited number of beam angles can be used to avoid the prostheses. In this case study, we will report the observed advantages of using noncoplanar beams in the delivery of IMRT to ...
The purpose of this work is to develop a novel feature-based registration strategy to automatically map the rectal contours from planning computed tomography (CT) (pCT) to cone beam CT (CBCT). The rectal...Full Text Available
The Guide is intended to provide guidelines for the initial preparation of FFTF Operating Procedures. The Procedures Preparation Guide was developed from the plan presented and approved in the FFTF Reactor Plant Procedures Plan, PC-1, Revision 3.
BackgroundObesity has reached epidemic proportions in the United States. It is implicated in the development of a variety of chronic disease states and is associated with increased...Full Text Available
Purpose:To investigate the clinical usage of dose verification of Helical Tomotherapy plans by using 2D-array ion chambers, and to develop an efficient way to validate the dose delivered...Full Text Available
BackgroundThe purpose of our investigation was to compare a digital templating system to conventional templating techniques when preoperatively planning for total hip arthroplasty.MethodsWe...Full Text Available
The aim of this study is to develop an Automatic Post-processing Tool for four-dimensional (4D) treatment planning (APT4D) that enables the user to perform some necessary procedures related...Full Text Available
Program plans of the Office of Coal Technology in coal liquefaction are presented. Technology description, status, market applications, program strategy and program management descriptions are included. 2 figs. (CBS)
The Plan identifies the Army's organization, goals, objectives, and policies with respect to energy. It projects energy consumption and costs to the year 2000 and summarizes the programs required to support the long range goals. A summary of current and needed energy related legislation is included. (Author)
In June 2010, Basic Energy Plan was approved in a Cabinet meeting. It says that Japan aims to construct more than 14 atomic power plants by 2030. Today, there are 12 plans of construction of atomic power plant, but it is hard to say that their plans easily come off. That's because public acceptance of atomic power plant is low in Japan, for example local residents wage opposition campaigns. This study conducts a survey in the form of a questionnaire and analyzes it by Analytical Hierarchical Process (AHP). Analytic Hierarchy Process is a structured technique for dealing with complex decisions. A questionnaire using AHP is very easy to answer and analyze. This survey was conducted in 2 areas. First area is Hohoku-cho, Yamaguchi Pref. that had a plan of construction of atomic power plant and the plan was demolished by opposition campaigns. Second area is Kaminoseki-cho, Yamaguchi ...
...2010-10-01 false Special rules relating to group health plans. 146.145 Section 146.145 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS REQUIREMENTS FOR THE GROUP HEALTH...
42 Public Health 3 2010-10-01 2010-10-01 false Health benefits plan: Supplemental health services. 417.102 Section 417.102 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF...
Abstract: HARVEST was designed as a strategic research and planning tool, allowing assessment of the spatial pattern consequences of broad timber management ...
... due to the evolving nature of the Strategy Maps and the changing priority roles, it was decided not to link the SMSP directly with any Strategic Plans. ...
The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.
The Risk Evaluation System (RES) is an integrated approach to determining safeguards and security effectiveness and risk. RES combines the planning and technical analysis into a format that promotes an orderly development of protection strategies, planning assumptions, facility targets, vulnerability and risk determination, enhancement planning, and implementation. In addition, the RES computer database program enhances the capability of the analyst to perform a risk evaluation of the facility. The computer database is menu driven using data input screens and contains an algorithm for determining the probability of adversary defeat and risk. Also, base case and adjusted risk data records can be maintained and accessed easily.
This document establishes the minimum training requirements for the Plutonium Finishing Plant (PFP) personnel who are responsible for management of dangerous waste. The training plan outlines training requirements for handling of solid dangerous waste during generator accumulation and liquid dangerous waste during treatment and storage operations. The implementation of this training plan will ensure the PFP facility compliance with the training plan requirements of Dangerous Waste Regulation. Chapter 173-303-330. Washington Administrative Code (WAC). The requirements for such compliance is described in Section 11.0 of WHC-CM-7-5 Environmental Compliance Manual.
... CJCSI 3141.01C, Responsibilities for the Management and ... of a multivolume set of CJCS unclassified and ... (1) CJCSM 3122.01A, Joint Operation ...
The Idaho National Laboratory (INL) Ten-Year Site Plan (TYSP) describes the strategy for accomplishing the long-term objective of transforming the laboratory to meet Department of Energy (DOE) national nuclear research and development (R&D) goals, as outlined in DOE strategic plans. The plan links R&D mission goals and INL core capabilities with infrastructure requirements (single- and multi-program), establishs the 10-year end-state vision for INL complexes, and identifies and prioritizes infrastructure needs and capability gaps. The TYSP serves as the basis for documenting and justifying infrastructure investments proposed as part of the FY 2013 budget formulation process.
This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department.
... is to develop a systematic program of energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan (AFEP ...
... projects that will result in the reduction of energy consumption in compliance with the objectives set forth in the Army Facilities Energy Plan, without ...
This Radioactive and Mixed Waste Management Plan for the Hazardous Waste Handling Facility at Lawrence Berkeley Laboratory is written to meet the requirements for an annual report of radioactive and mixed waste management activities outlined in DOE Order 5820.2A. Radioactive and mixed waste management activities during FY 1994 listed here include principal regulatory and environmental issues and the degree to which planned activities were accomplished.
Military working dogs are rapidly becoming integral to military operations. While they bring many valuable capabilities to the battlefield, it is important that Special Operations leaders consider canine team capabilities and requirements when planning missions. Careful logistical and operational planning can optimize the health, performance, and readiness of the working dog while protecting the safety and well-being of the team members working with them. We also offer recommendations for medical treatment of dog bites. PMID:19813342
The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site.
The reports in this series are designed primarily to familiarize professional land use and resource planners with the range of possibilities and effective procedures for achieving integrated mining, reclamation, and land use planning. These reports are ba...
IAEA Plans of activities include, General Conference in September 2001 which reviewed activities relevant to preventing nuclear terrorism and proposed master plan. The Board of Governors approved new Nuclear Security Plan for the next four years. Three activity areas are; - needs assessment, analysis and coordination, prevention and detection and response.
The Hungarian Power Companies Ltd. has been using the IAEA planning methodologies since 1985 when it acquired the WASP model. Since then this model has been applied on a regular basis to determine the least cost expansion plan of the power generating system of the country. This report describes this experience as well as the application of the WASP model for other types of studies. (author).
The Conference on Building Design and Architecture organized by Swedish Council for Building Research Contents included articles on building physics, thermal-climate technology, and building location and planning.
An experimental plan for improving the problems of failed fuel location system in Wolsung Unit-2 reactors was established. It is not possible to make an experiment on the failed fuel monitoring nuclides in the cold laboratories because they have very short half life. Therefore, the experiments can be only carried out at the existing monitoring system under reactor operation. For that reason, an experimental plan was drawn up for installing the radiation detection system on reactor site.
Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.
Topics of this proceedings are: DNA damage and repair; Space research; Cell and tissue radiobiology; Treatment planning 1: The role of clinical RBEs; Treatment planning 2: Dose optimization and inverse planning; Dosimetry; Clinical results of particle therapy and new techniques; Status reports and future developments. Separate abstracts were prepared for 79 chapters. (orig./SR)
The University of Maryland at Baltimore was awarded a grant from the Department of Energy to test a specially modified incinerator to burn biomedical radioactive waste. In preparation for the incinerator, the Radiation Safety Office devised a comprehensive plan for its safe and effective use. The incinerator plan includes a discussion of regulations regarding on-site incineration of radioactive waste, plans for optimum use in burning four principal waste forms, controlled air incineration technology, and standard health physics safety practices; a use plan, including waste categorization and segregation, processing, and ash disposition; safety procedures, including personnel and area monitoring; and methods to evaluate the incinerator's effectiveness by estimating its volume reduction factors, mass and activity balances, and by determining the cost effectiveness of incineration versus ...
This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition.
Restructuring of power system has changed the traditional planning objectives and introduced challenges in the field of Transmission Expansion Planning (TEP). Due to these changes, new approaches and criteria are needed for transmission planning in deregulated environment. Therefore, in this paper, a dynamic expansion methodology is presented using a multi-objective optimization framework. Investment cost, congestion cost and reliability are considered in the optimization as three objectives. To overcome the difficulties in solving the non-convex and mixed integer nature of the optimization problems, a Non-Dominated Sorting Genetic Algorithm (NSGA II) approach is used followed by a fuzzy decision making analysis to obtain the final optimal solution. The planning methodology has been demonstrated on the IEEE 24-bus test system and north-east of Iran national 400 kV transmission grid to show the ...
Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems ...
A consortium of four institutions, based at Western Michigan University, was to plan a Research and Development Center on Student Testing, Evaluation, and Standards Setting. The four consortium sites are Boston College, the Dallas Independent School District, the University of Kansas, and Western Michigan University. This report is a final performance report for the planning grant made to Western Michigan University by the National Institute of Education. The first section provides a summary of the planning activities actually conducted under the grant. It includes a description of particular problems and successes, a list of participants and their affiliations, and an evaluation report for the planning project. The second section is a technical report on the Research and Development (R and D) mission for the Center. It updates the mission and strategy statement contained in the ...
This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As ...
Purpose: Various published reports involving intensity-modulated radiotherapy (IMRT) plans developed using automated optimization (inverse planning) have demonstrated highly conformal plans. These reported conformal IMRT plans involve significant target dose inhomogeneity, including both overdosage and underdosage within the target volume. In this study, we demonstrate the development of optimized beamlet IMRT plans that satisfy rigorous dose homogeneity requirements for all target volumes (e.g., #+-#5%), while also sparing the parotids and other normal structures. Methods and Materials: The treatment plans of 15 patients with oropharyngeal cancer who were previously treated with forward-planned multisegmental IMRT were planned again using an automated optimization system developed in-house. The optimization system ...
France has committed herself to keep in 2010 the same levels of greenhouse gas emissions as those of 1990, i.e. 144 millions of tons of carbon equivalent (MtCe). However, taking into account the existing pollution abatement measures and the measurements performed so far, the greenhouse gases level should reach 160 MtCe in 2010. Therefore, the inter-ministry commission on greenhouse effect decided on November 27, 1998 to elaborate a new national plan of fight against greenhouse effect. The elaboration of the new plan has fallen under the responsibility of the inter-ministry mission of greenhouse effect (MIES). The new plan was presented by the prime minister, L. Jospin, on January 19, 2000. This document summarises the content of the new plan: architecture (modalities of elaboration, content), measures for the reduction of greenhouse gas emissions (industry, transportation sector, buildings, ...
Summary'THE ROLE OF THE UK PLANNING SYSTEM IN PROTECTING AND ENHANCING SOILS PROJECT REF: UKLQ01 APRIL 2004 INTRODUCTION Soil has long been overlooked in environmental planning. Whilst it has sometimes benefited from indirect protection, until recently its importance and vulnerability have not been reflected in more explicit strategies. This study explored the current and potential role of the planning system in protecting and enhancing soils. Soil is the physical material that covers much o [continued...]DescriptionSNIFFER has commissioned this study on behalf of SEPA, SNH, EHS and the Environment Agency for England and Wales. These UK agencies have an interest in protecting soil quality through a combination of direct regulation of emissions to land, protection of designated sites of special value or sensitivity and engaging other regulatory regimes such as land use planning. All UK environment ...
The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication ...
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and ...
A plan to diffuse instructional modules for the preparation of transportation professionals is presented, based on research and demonstration projects sponsored by the Urban Mass Transportation Administration (UMTA). The diffusion/adoption plan involves: developing instructional modules; disseminating the modules to professors teaching transportation courses at the college level; promoting the use and adoption of the modules; and evaluating and revising the plan. Transportation educators teach in a variety of disciplines (e.g., engineering, public administration, urban planning, and technology). Eight design and evaluation criteria for the instructional modules are listed, along with the procedures used by West Virginia University in developing the five instructional modules. The diffusion strategy involves repackaging UMTA research findings, change agents, and the use of information channels (e.g, ...
This Maintenance Improvement Plan has been developed for maintenance functions associated with the 222-S Laboratory. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter 11. The objective of this plan is to provide information for establishing and identifying WMH conformance programs and policies applicable to implementation of DOE Order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost effective and efficient maintenance program at 222-S Laboratory. Maintenance activities are mainly going to be performed by existing maintenance organizations within Waste Management Federal Services of Hanford (WMH). Most maintenance performed at 222-S Laboratory is performed by the 222-S Laboratory maintenance organization. This 222-S Laboratory Maintenance ...
An overview of the Canadian mining industry`s state of preparedness for the Year 2000 is presented. Committees within the mining industry are working on scheduling and implementing activities, defining criticality, monitoring remedial action, and contingency planning. The Mining Association of Canada is working with the Federal Government`s National Contingency Planning Group to deal with potential threats to health and security. Survey results suggest that mining poses a low to medium risk based on the state of planning for Y2K. The results of a survey of member preparedness is tabulated. 1 tab.
This symposium about electric operational and expansion planning presents several articles that approaches issues such as, monitoring the power system stability, electrical load modelling, reliability in power systems, optimization in power systems, integrated resources planning in power systems, reactive control through static compensators, power flow analysis, system modelling, etc
Sirio is a computerized application to manage the hydroelectric system in a short time. This management is implemented as a real time tool in the Control Department. SIRIO has many modules, independent and integrated to operate and perform the data acquisition, optimization, planning simulation and planning optimization. This article presents the SIRIO System and its applications to the Iberdrola system in Tajo river.
This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.
The main objective of this paper is to demonstrate that it makes good business sense to identify risks and hazards of an operation and take appropriate steps to manage them effectively. Developing and implementing an effective risk and hazard management plan also contibutes to other industry requirements and standards. Development of a risk management system, key elements of a risk management plan, and hazards and risk analysis methods are outlined. Comparing potential risk to the cost of prevention is also discussed. It is estimated that the cost of developing and preparing the first risk management plan varies between $50,000 to $200,000. 3 refs., 2 figs., 1 tab.
This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 {open_quotes}Nuclear Facilities{close_quotes}. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP.
The brochure contains information about the Emergency Planning and Community Right-to-Know Act. This law establishes a structure at the state and local levels to assist communities in planning for chemical emergencies and requires facilities to provide information on various chemicals present in the community. The Act requires that this information be made available to the public. One of the requirements concerns the reporting of annual releases of toxic chemicals to the air, water, and land. These provisions are outlined in Section 313 which mandates annual release reporting for over 300 chemicals.
Theft, illegal possession, smuggling, or attempted unauthorized sale of nuclear and radiological materials remains a worldwide problem. The Nuclear Smuggling International Technical Working Group (ITWG) has adopted a model action plan to guide investigation of these cases through a systematic approach to nuclear forensics. The model action plan was recently documented and provides recommendations concerning incident response, collection of evidence in conformance with required legal standards, laboratory sampling and distribution of samples, radioactive materials analysis, including categorization and characterization of samples, forensics analysis of conventional evidence, and case development including interpretation of forensic signatures. (author)
We have studied the application of direct aperture optimization (DAO) as an inverse planning tool for breast IMRT. Additionally, we have analysed the impact of respiratory motion on the quality of the delivered dose distribution. From this analysis, we have developed guidelines for balancing the desire for a high-quality optimized plan with the need to create a plan that will not degrade significantly in the presence of respiratory motion. For a DAO optimized breast IMRT plan, the tangential fields incorporate a flash field to cover the range of respiratory motion. The inverse planning algorithm then optimizes the shapes and weights of additional segments that are delivered in combination with the open fields. IMRT plans were generated using DAO with the relative weights of the open segments varied from 0% to 95%. To assess the impact of breathing motion, the ...
This document presents a detailed schedule for the implementation of the strategy for managing defense remote-handled (RH) transuranic (TRU) waste. The baseline management strategy was defined in the Defense Remote-Handled Transuranic Waste Cost/Schedule Optimization Study and is summarized in this document. Also included are revised RH TRU waste inventory projections, current site management plans, a list of key decision points and milestones, and a discussion of uncertainties associated with management of RH TRU waste. The plans are summarized in a detailed schedule diagram and in an RH TRU waste work off diagram. 9 refs., 5 figs., 4 tabs.
'As part of the Computer Protection Plan, this Network Security Plan identifies the specific security measures used to protect Bechtel Hanford, Inc.'s (BHI's) enterprise network. The network consists of the communication infrastructure and information systems used by BHI to perform work related to the Environmental Restoration Contract (ERC) at the Hanford Site. It provides electronic communication between the ERC-leased facilities in Richland, Washington, and facilities located on the Hanford Site. Network gateways to other site and offsite networks provide electronic communication with the remainder of the Hanford community.'
This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This ...
... The revised work plan emphasized the research priorities of preharvest rodent damage to rice, the importance of postharvest food losses to rodents ...
Sick leave and other types of nonvested leave are expensed as taken. ... Employees Retirement System (FERS), a defined benefit and contribution plan. ...
The article presents briefly the plans of the British Petroleum Oil Company for a new hydrogen power plant that includes an offshore platform in the North Sea.
The book tries about the International and national aspects, natural gas situation, production, consumption, prices, demand projection, energetic plans, norms and laws of the natural gas in Colombia
15 to 75% of the gun barrel diameter. Similarly, model masses typically vary from 0.01 to 100 .... taining acceptable levels of gun barrel erosion. The ...
Canada will provide telescope baffles and fine error sensor assemblies. ..... ( Ongoing) Flight tests aboard sounding rockets and balloon planned for FY 1995. .... the effects of incoming energetic particles and solar radiation on the ...
Project methodology, analysis of the occupational and training situation, task analysis process, design process for a systematic training plan specific to the job position are described.
Apr 22, 2010 ... I believe that space exploration is not a ... plan for space exploration, especially in .... space exploration beyond low Earth orbit. ...
... kinematic model for the robots and designed ... theoretic approach for modeling mobile robot teamn formations". ... "UUV teams, control from a biological ...
Japan Atomic Energy Research Institute (JAERI) is developing the world`s strongest spallation neutron source using high power proton accelerator and promoting a neutron science project for comprehensive studies on basic science and nuclear transmutation of high-level radioactive nuclide from nuclear power stations. For this purpose, JAERI organized the Special Taskforce for Neutron Science and OMEGA Project in April 1996 and reorganized it to Center for Neutron Science in April 1997. During this period, various research plans using the spallation neutron source are proposed and facilities necessary for research are studied by mainly research groups of JAERI. This report describes research plans and results of the preliminary conceptual design study on proposed facilities plan. (author)
Rationale and ObjectivesSample-size estimation is an important consideration when planning a receiver operating characteristic (ROC) study. The aim of this work was...Full Text Available
This paper discusses organizational models of planning technology development in coal mining. The following 4 planning systems are analyzed: all-union national system coordinated by the Ministry of Coal Mining of the USSR, all-union associations of coal mine associations (in the Ukrainian SSR the plan is developed by the Ministry of Coal Industry of the Republic), associations of coal mines, coal mines or groups of coal mines. Methods for developing programs for technology development at 4 levels are reviewed. The following planning periods are used: 10 years or more (from 1980 to 1990), a 5 year period and a 1 year period. System for technology development in the Soviet coal industry from 1981 to 1985 is evaluated: research and development programs (20 comprehensive state programs, 36 branch programs). (In Russian)
Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.
Map layer displays land designated as Suitable Land For Timber Production for the Forest Plan. It consists of all National Forest Lands less Non-forested ... ...
... less humans have to do to operate a robot. ... Robots can help human operators with the increase ... important mission outlined by the UUV master plan. ...
o If retaining CSRS/FERS, transferred employee will be credited with accumulated sick leave o Be reimbursed for travel, transportation, relocation costs ...
... System (CSRS) and the Federal Employees Retirement System (FERS). ... retirement, thrift savings plan, annual and sick leave, severance pay and ...
Jun 6, 2011 ... Sick leave is earned at a rate of 4 hours per pay period. ... The Federal Employees Retirement System (FERS) is a three-tiered pension plan ...
Purpose: The aim of this study was to assess interinstitutional variations in planning for stereotactic body radiation therapy (SBRT) for lung cancer before the start of the Japan Clinical Oncology Group (JCOG) 0403 trial.Methods and Materials: Eleven institutions created virtual plans for four cases of solitary lung cancer. The created plans should satisfy the target definitions and the dose constraints for the JCOG 0403 protocol.Results: FOCUS/XiO (CMS) was used in six institutions, Eclipse (Varian) in 3, Cadplan (Varian) in one, and Pinnacle3 (Philips/ADAC) in one. Dose calculation algorithms of Clarkson with effective path length correction and superposition were used in FOCUS/XiO; pencil beam convolution with Batho power law correction was used in Eclipse and Cadplan; and collapsed co...
This operation plan covers the period of operations from the time major elements of the joint task force are deployed in the forward area until the completion of on-site operations. It was published for planning purposes only, always subject to periodic revision and refinement as more detailed information became available. ENIWETOK-BIKINI Danger Area, as the term is used in this plan, is that area encompassing ENIWETOK and BIKINI ATOLLS and bounded by the meridians 160 deg 35' - 166 deg 16' east longitude, and by the parallels 10 deg 15' - 12 deg 45' north latitude (an area of 150 by 350 miles).
Program Plans, Implementation, & Results Energy Management at Federal Facilities Energy Management at DOE Fleet Management Interagency Coordination Interagency Energy...
Nov 15, 2006 ... Sick leave and other types of non-vested leave ... For FERS employees, NASA makes contributions of 10.7 percent to the defined benefit plan, ...
The management of risks of explosives are described. Administrative and procedural controls are considered. The safety management plan involves hazard identification, risk analysis, assessment and control. The current position of explosives safety is considered. 4 tabs.
Two complementary computer programs have been developed for forecasting the demands and evaluating the costs of proposed radiographic facilities. The models are employed here in analyses of the sensitivity...Full Text Available
This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, identifies and outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories New Mexico Technical Area (TA)-V Groundwater. The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for the TA-V Groundwater. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of ...
This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, identifies and outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories/New Mexico Technical Area (TA)-V Groundwater. The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for the TA-V Groundwater. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of ...
Disclosed in this proposal are plans to construct a patent pending wrist module with computer control, configurable to form high-dexerity telerobotic arms ...
Feb 6, 2003 ... Director, Plans and Programs, Headquarters Air Force Materiel Command, .... Commander of the Joint Task Force Southwest Asia at Prince ...
... Deepwater Program is a 25-year, $24 billion plan to replace or modernize its fleet of vessels, aircraft, and information management capabilities. ...
He said, I had heard of Cloud Computing when I was in grad school, but they had presentations on it at EclipseCon. I was sold that it was something that ...
The bacterium Serratia marcescens produces a plethora of multicellular shapes of different colorations on solid substrates, allowing immediate visual detection of varieties. Such a...Full Text Available
Science plays paradoxical roles in environmental planning. As a process for generating and adapting knowledge of the biophysical environment to human use, it is essential to achieving sustainability. As the socially contested evaluation of competing claims to truth, however, adversarial science often becomes the focus of conflict in the planning process. British Columbia's Central Coast Land and Resource Management Plan (CCLRMP) planning process took place amid industrial restructuring, market campaigns, and scientific disputes over the conservation of the world's largest remaining temperate rainforest. This article shows how adversarial science set the terms of the policy debate, as well as the means for compromise. A multisector interdisciplinary information team played a key role in arr...
... the program manager plans to spend $23.2 million to procure 107 Hornets in excess of the 270 required by the 82nd Airborne Division for its basic ...
In recent years conservation of electric power has become an integral part of utility planning. The 1980 Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act) requires that the region consider conservation potential in planning acquisitions of resources to meet load growth. The Bonneville Power Administration (BPA) developed its first estimates of conservation potential in 1982. Since that time BPA has updated its conservation supply analyses as a part of its Resource Program and other planning efforts. Major updates were published in 1985 and in January 1990. This 1992 document presents updated supply curves, which are estimates of the savings potential over time (cumulative savings) at different cost levels of energy conservation measures (ECMs). ECMs are devices, pieces of equipment, or actions that increase the efficiency of electricity use and reduce the amount of ...
BackgroundThe typical Korean diet includes rice, which is usually served in a rice bowl. We investigated the effects of a meal plan using rice bowls of varying sizes on dietary energy...Full Text Available
The salient features of the near-infrared free-electron laser (FEL) that is under construction at the new Darmstadt superconducting 130-MeV electron accelerator are discussed. Special attention is given to the layout and the parameters of the accelerator, the layout of the planned FEL experiment, the characteristics of the electron gun, the subharmonic chopper-buncher system, and the hybrid undulator system of the Darmstadt FEL. A comparison of the planned Darmstadt FEL with conventional lasers, with respect to the pulse and wavelength region, is presented. 15 refs.
Energy sector is relatively easy to evaluate economically. There have existed reliable statistics on energy systems and consumption and the planning has been based on them. However the environmental factors have been integrated into the Danish energy policy first in the nineties, and the new socio-economic evaluations have to take the pollution abatement measures into account. (EG)
The report presents an integrated software system developed at the Norwegian Electric Power Research Institute (EFI), for production scheduling, maintenance handling, network security analysis, inflow forecasting, and load forecasting. The integrated software is being developed with focus on hydro-dominated power supply systems. In specific terms it is expected that application of the software will improve the operational decisions, and make the planning process more effective. The optimal scheduling of hydro resources poses severe computational problems in system operations planning. This necessitates problem decomposition. In the EFI approach, planning is split into three main levels: long-term, mid-term and short-term planning. The long-term planning aims at evaluating the seasonal and pluriannual handling of regional storages in view of firm power supply obligations, inflow ...
The aim of this report is to show how Energetic Planning and Territorial Policy should be working together for a better integration of Renewable Energies into Region. This Integration should to contemplate social, economic and environmental aspects of the territory. The report has been classified into 7 items: planning, energetic scenarios, technology transfer for Renewable Energies dissemination, barriers for this dissemination, environmental aspects, European Union Policy and Decision Support Systems (and specially GIS). (Author) 54 refs.
The paper deals with the disposal of radioactive waste and the plans for dealing with solid wastes of intermediate and low levels of activity, which are the responsibility of NIREX. NIREX is an executive body which co-ordinates the waste-disposal plans of the main radioactive waste producers. The disposal routes for the active wastes are described including the deep disposal of wastes containing material that will remain active for thousands of years. Requirements for deep burial are outlined with reference to the geology and hydrogeology of the site. Monitoring, maintenance and surveillance are mentioned for the protection of the public.
This quality assurance plan (QAP) is designed ensure that the methodologies and the data used for environmental cleanup and treatment studies at the Nevada Test Site are both usable and defensible. The QAP serves two purposes in this regard: (1) to guide the preparation of procedures for carrying out the tasks of the Basic Environmental compliance and Monitoring program (BECAMP); and (2) to help management track the progress of those tasks.
This Project Management Plan combines the project management deliverables from the P+ methodology that are applicable to this part of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.
The Sodium Storage Facility Project Quality Assurance Plan delineates the quality assurance requirements for construction of a new facility, modifications to the sodium storage tanks, and tie-ins to the FFTF Plant. This plan provides direction for the types of verifications necessary to satisfy the functional requirements within the project scope and applicable regulatory requirements determined in the Project Functional Design Criteria (FDC), WHC-SD-FF-FDC-009.
This Test Plan outlines the testing to be done on the Special Protective Coating (SPC) Polyurea which includes: Tank Waste Compatibility, Decontamination Factor Testing, and Adhesion Strength Testing after a sample has been exposed to Radiation.
A focused ion beam (FIB) system has been applied to prepare a thin foil specimen of Si, MgO and alumina which contained cracks in the plan of foil. It was possible to observe a much larger area at and near a crack tip than has been hitherto possible. FIB was also applied to observation of microstructure near a crack tip evolved during severe rolling contact fatigue in a steel.
... orthopaedics, waiting times, NHS, private hospitals,health news, medical news, health services, medical treatments, health tips NHS ...be sent to private hospitals for surgery in a bid to bring orthopaedic waiting times under control. Plan to send NHS patients for ...
One of the supporting elements of the Advanced Turbine Systems (ATS) Program is the materials/manufacturing technologies task. The objective of this element is to address critical materials issues for both industrial and utility gas turbines. DOE Oak Ridge Operations Office (ORO) will manage this element of the program, and a team from DOE-ORO and Oak Ridge National Laboratory is coordinating the planning for the materials/manufacturing effort. This paper describes that planning activity which is in the early stages.
In accordance with the comprehensive plan in the eleventh five-year period the main content of prospecting and exploration on land in Axerbaidzhan by the Axneft' association will be done in the central and Western regions of the republic, where Paleogene-Mesozoic deposits will be inspected. Discussed in detail are the directions and volumes of prospecting and exploration in individual regions of Azerbaidzhan. They are determined with consideration of the degree of exploration of the earth's interior, the prospects for the deposits comprising them, and the development of the resources of oil.
Denmark has been one of the first countries in the world to commit itself to a sustainable energy development. This has been substantiated by two official action plans from 1990 and 1996 with emphasis on energy efficiency and supply systems based on renewable energy. In year 2005, renewable energy sources are planned to cover 12-14% and in year 2030 about 35% of total Danish energy demand. This paper reviews the experiences with implementation of renewable energy in Denmark with a focus on wind power and biomass.
The purpose of this analysis is to develop a systematic program of projects that will result in energy consumption reductions in compliance with the stated goals of the Army Facilities Energy Plan for the Stratford Army Engine Plant in Stratford, Connecticut. Reduced energy consumption is a stated goal for the Army Facility Energy Plan.
Describes the Indonesian system of education of Islamic schooling, secular education, and out-of-school education. The provision of 9-year universal basic education is planned by 2004. The national plan challenges the education system to facilitate the change in Indonesia's economic structure from an agriculturally based system to one more dependent on manufacturing and service industries. (SLD)
...htm Waste Framework Directive 75/442/EEC (amended by Directive 91/156/EEC) and Waste Management Planning http://ec.europa.eu/environment/waste/plans/index.htm Selected EC commissioned/supported projects including LCA IPP Pilot Product exercise on mobile phones and on tropical garden furniture http://ec.europa.eu/environment/ipp/pilot.htm \\
A simplified stormwater management model has been developed to provide an inexpensive, flexible tool for planning and preliminary sizing of stormwater facilities. The model was developed to be part of a methodology for use in the management of stormwater that utilizes both simple...
Supplement B to the Terra Nova Development Application provides a description of the floating production storage and offloading (FPSO) vessel system selected for the development, a summary of the reasons for selecting the system, and the impact of this selection on the Development Plan, the Benefits Plan, the Environmental Impact Statement and the Socio-Economic Impact Statement. There is also a description of the contractor alliance approach to be used in the Terra Nova Development. Refs., tabs., figs.
A heuristic algorithm that employs fuzzy logic is proposed to the power system transmission expansion planning problem. The algorithm is based on the divide to conquer strategy, which is controlled by the fuzzy system. The algorithm provides high quality solutions with the use of fuzzy decision making, which is based on nondeterministic criteria to guide the search. The fuzzy system provides a self-adjusting mechanism that eliminates the manual adjustment of parameters to each system being solved. (author)
Three book reviews and five essays address the problems of governing coastal regions. The books reviewed and the articles covered the institutions and programs involved in resource management, the balance of local and state interests in coastal conservation and developments, a consensus on coastal planning issues, and a growing trend in state-local collaborative planning. Four of the articles pertain to California, and one focuses on programs in Maine, Rhode Island, and Washington. 135 references. (DCK)
DescriptionThe overall aim of this application is to examine experimentally environmental influences on the pattern of senescence in birds. We plan to experimentally uncouple chronological age and reproductive effort and examine their effects on reproductive performance and lifespan. We also plan to examine experimentally how these relationships are influenced by nutritional conditions during early development. We will combine the organismal fitness measures of lifespan and reproductive performance with me [continued...
42 Public Health 3 2010-10-01 2010-10-01 false Health benefits plan: Basic health services. 417.101 Section 417.101 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND...
A new three-dimensional treatment planning system (TPS) based on convolution/superposition algorithms (TMS-Radix from HELAX AB, Uppsala, Sweden) was recently installed at the University Hospital in Lund. The purpose of the present study was to design a quality assurance and acceptance testing programme to meet the specific characteristics of this convolution model. The model is based on parametrization of a non-measurable quantity - the polyenergetic pencil beam. However, the verification of the treatment planning model is still dependent on numerous comparisons of measured depth-doses and dose profiles. The test programme was divided in two basic parts: (i) model implementation and beam data consistency and (ii) model performance and limitations in special situations. The first part was scheduled for all photon beam qualities available before they could be used for clinical treatment planning. The second part was performed ...
The paper presents the progress of the Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor WWR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for WWR-S decommissioning was also developed. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management ...
Many governments around the world are focusing on emissions reduction through energy efficiency improvements, particularly on the demand side. Although Integrated Resource Planning (IRP), which considers both supply-side and demand-side options, had been a useful tool in the planning process for the power industry, its effectiveness has been challenged recently with the restructuring of the power sector that has occurred in China and elsewhere around the world. The paper proposes Integrated Resource Strategic Planning (IRSP) as an alternative to IRP in a deregulated power sector. IRSP takes the resource planning process one step further to the national level. In this paper, the authors demonstrate the tremendous potential for efficiency improvements on both the supply and demand sides of the power sector in China with IRSP. The results show that between 2009 and 2020, the potential for electricity ...
Many governments around the world are focusing on emissions reduction through energy efficiency improvements, particularly on the demand side. Although Integrated Resource Planning (IRP), which considers both supply-side and demand-side options, had been a useful tool in the planning process for the power industry, its effectiveness has been challenged recently with the restructuring of the power sector that has occurred in China and elsewhere around the world. The paper proposes Integrated Resource Strategic Planning (IRSP) as an alternative to IRP in a deregulated power sector. IRSP takes the resource planning process one step further to the national level. In this paper, the authors demonstrate the tremendous potential for efficiency improvements on both the supply and demand sides of the power sector in China with IRSP. The results show that between 2009 and 2020, the potential for electricity ...
In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the ...
The Hazardous Material Management and Emergency Response Training and Education Center -- known simply as HAMMER -- is being developed to assist the US Department of Energy (DOE) and others dedicated to improving worker health, safety and productivity. HAMMER is a training and education program for hazardous material, waste management, and emergency response workers. HAMMER is managed by the DOE Richland Operations Office under Work Breakdown Structure (8.2). The 1996 Multi-Year Program Plan (MYPP) includes the Execution Year data and provides the information for Programmatic Fiscal Year Site Management System Execution Baseline, as well as the detailed work plan for performance evaluation of the authorized work. The MYPP incorporates various planning methodologies to define the program and provides essential program integration, and a fully developed technical, cost, and schedule baseline. The MYPP will be utilized by WHC ...
In response to US Department of Energy directives, Argonne National Laboratory (ANL) has developed a waste minimization plan aimed at reducing the amount of wastes at this national research and development laboratory. Activities at ANL are primarily research- oriented and as such affect the amount and type of source reduction that can be achieved at this facility. The objective of ANL's waste minimization program is to cost-effectively reduce all types of wastes, including hazardous, mixed, radioactive, and nonhazardous wastes. The ANL Waste Minimization Plan uses a waste minimization audit as a systematic procedure to determine opportunities to reduce or eliminate waste. To facilitate these audits, a computerized bar-coding procedure is being implemented at ANL to track hazardous wastes from where they are generated to their ultimate disposal. This paper describes the development of the ANL Waste Minimization Plan ...
Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear power station has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear Power Station (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 the medium level
The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to ...
This plan establishes a Department-wide goal to reduce total releases of toxic chemicals to the environment and off-site transfers of such toxic chemicals by 50 percent by December 31, 1999, in compliance with Executive Order 12856. Each site that meets the threshold quantities of toxic chemicals established in the Emergency Planning and Community Right-to-Know Act (EPCRA) will participate in this goal. In addition, each DOE site will establish site-specific goals to reduce generation of hazardous, radioactive, radioactive mixed, and sanitary wastes and pollutants, as applicable. Implementation of this plan will represent a major step toward the environmental risks and costs associated with DOE operations and increasing the Department's use of preventive environmental management practices. Investing in Waste Minimization Pollution Prevention (WMin/PP) steadily reduce hazardous and radioactive waste generation and will ...
The performance of a convolution/superposition based treatment planning system depends on the ability of the dose calculation algorithm to accurately account for physical interactions taking place in the tissue, key components of the linac head and on the accuracy of the photon beam model. Generally the user has little or no control over the performance of the dose calculation algorithm but is responsible for the accuracy of the beam model within the constraints imposed by the system. This study explores the dosimetric impact of limitations in photon beam modeling accuracy on complex 3D clinical treatment plans. A total of 70 photon beam models was created in the Pinnacle(TM) treatment planning system. Two of the models served as references for 6 MV and 15 MV beams, while the rest were created by perturbing the reference models in order to produce specific deviations in specific regions of the calculated dose profiles ...
The DEFENSE WASTE MANAGEMENT PROGRAM has been chartered by the Department of Energy (DOE) to receive, reduce, store, and maintain all radioactive defense waste generated by Hanford and received from offsite DOE contractors in a safe condition and in accordance with DOE and Westinghouse Hanford Company (WHC) standards. These activities are accomplished through the use of TRU retrievable storage sites, solid waste burial grounds, liquid waste storage tanks, capsule storage pools, and other low-level waste disposal methods. Continuous and/or periodic surveillance is maintained. Through the use of improved packaging methods, evaporator-crystallization and capsule production waste has been and continues to be put in a safe and economic storage condition pending future reprocessing or final disposition. For this Program Plan, the scope of Defense Waste Management programmatic activities has been organized into three general categories. A summary outline of the work ...
The paper discusses the methodology used at Electricidade de Portugal (EDP) in planning its electric power system. In particular, it considers a description of the methodology used by EDP for a more accurate definition of the input data required to characterize hydroelectric plants and the evaluation of their impact on an optimal long-term expansion plan. In addition, the paper describes an analysis of the results of studies, both with WASP-II and WASP-III, with and without pumped storage plants, respectively. Finally, the paper details the use of VALOR AGUA, in conjunction with WASP, for a better simulation of the hydroelectric system and which also permits to solve other problems closely connected such as the calculation of marginal production costs. (author).
Integrated resource planning is rapidly emerging as the preferred planning process for electric utilities. Under IRP, planners project the initial and annual operating costs of different resource options and compare them using the revenue-requirements method (RRM)- a project-evaluation technique that discounts future costs (i.e., revenue requirements) into present values. The discount rate used for these computations is usually the firm's weighted-average cost of capital (WACC)-the weighted-average cost of the firm's equity and debt. The project alternative with the lowest present-value revenue requirement (PVRR) (i.e., lowest costs) emerges as the economic choice.
Boron neutron capture therapy (BNCT) trials for human glioma (glioblastoma multiform) were initiated September 1994 at the Brookhaven National Laboratory (BNL). Patients are given p-boronophenylalanine-fructose (BPA-F) intravenously as the boron carrier followed by exposure to the epithermal-neutron beam at the Brookhaven Medical Research Reactor (BMRR). The initial phase of the study is to determine safety and toxicity of the drug and irradiation procedure. The epithermal-neutron beam was developed in a joint effort by BNL and Idaho National Engineering Laboratory (INEL) researchers. For the human trials, treatment planning and radiation dose estimation is performed using the BNCT-Rtpe and the rtt-MC computer codes developed by the INEL BNCT program. This paper discusses our initial experience using these treatment planning codes for human subjects. The basic principles of BNCT have been previously documented.
Information about current and projected waste generation as well as available treatment, storage, and disposal (TSD) capabilities and needs is crucial for effective, efficient, and safe waste management. This is especially true for large corporations that are responsible for multisite operations involving diverse and complex industrial processes. Such information is necessary not only for day-to-day operations, but also for strategic planning to ensure safe future performance. This paper reports on some methods developed and successfully applied to obtain requisite information and to assist waste management planning at the corporate level in a nationwide system of laboratories and industries. Waste generation and TSD capabilities at selected US Department of Energy (DOE) sites were studied. 1 ref., 2 tabs.
Tiered response is a basic approach to emergency plans, including oil spill response (OSR). This paper delineates a huge set of accidental scenarios within a certain tier of response generated by a computer during risk assessment. Parameters such as the amount of oil spilled, duration of discharge and types of losses should be provided in OSR scenarios. Examples of applications include offshore installations, sub sea or onshore pipelines, and localized onshore facilities. The paper demonstrates how to use risk analysis results for delineating all likely spills into groups that need a specific tier response. The best world practices and Russian regulatory approaches were outlined and compared. Corresponding algorithms were developed and their application in pipelines was presented. The algorithm combines expert's skills and spill trajectory modeling with the net environmental benefit analysis principle into the incident specific emergency response ...
The Western Research Institute plan for addressing oil shale plant siting methodology calls for identifying the available resources such as oil shale, water, topography and transportation, and human resources. Restrictions on development are addressed: land ownership, land use, water rights, environment, socioeconomics, culture, health and safety, and other institutional restrictions. Descriptions of the technologies for development of oil shale resources are included. The impacts of oil shale development on the environment, socioeconomic structure, water availability, and other conditions are discussed. Finally, the Western Research Institute plan proposes to integrate these topics to develop a flow chart for oil shale plant siting. Western Research Institute has (1) identified relative topics for shale oil plant siting, (2) surveyed both published and unpublished information, and (3) identified data gaps and research needs. 910 refs., 3 ...
We evaluated in this study the value of preoperative examinations of anal atresia with an optimised MRI strategie. 13 patients with anorectal anomalies, most of them younger than one year, underwent an MRI examination of the pelvis. 10 of these patients were operated afterwards. Compared with the situs shown by the operation the results of the MRI examination were very exact in all cases in respect of the level of atresia and the development of the striateed muscle complex. Fistulas could be completely described in most cases. MRI demonstrated additional lesions in some patients which were of great importance for planning the further treatment of the patients. As a consequence MRI can give valid information on anal atresia for planning the operative treatment. (orig.).
Work on the coke oven gas cleaning demonstration project (CCT-11) this quarter has focused on Phase IIB tasks, and include engineering, construction, and training. Additionally, plans for changes in the operating schedule of the coke plant that affect the demonstration project are described. The project Milestone Schedule and Log is shown. Planned Baseline Supplemental Monitoring activities described in the Environmental Monitoring Plan were completed. Testing of the mechanical systems began in June, 1991. The cold commissioning date has been moved back from October 1, 1991 to November 1, 1991 to allow float for miscellaneous finish-up items beyond the electrical contractor`s projected completion date of October 31, 1991.
Thirty-nine conference papers review practical and topical aspects of hydroelectric development, from planning and design to construction, operation and refurbishment. More than half of the papers deal with small-scale hydro, reflecting the continuing strong interest in this subject throughout the world. The planning and economic evaluation of large-scale hydro schemes and pumped-storage plants, and environmental aspects of hydroelectric developments are also discussed. A special session has also been included on hydro in Latin America, where some of the world's largest schemes are planned or under construction. The papers reproduced here draw on the expertise of engineers from eighteen countries in North and South America, Europe, Asia, Australasia and Africa. All the papers were selected and indexed separately.
Canada has undertaken to stabilize greenhouse gas emissions to 1990 levels by the year 2000. To achieve that objective, a voluntary challenge registry (VCR) plan was initiated by the federal and provincial governments to encourage industry, governments, and public sector to take voluntary actions that would contribute to the reduction of greenhouse gas emissions. The initiatives that CAPP member companies have taken were outlined in CAPP's 1995 Action Plan: Climate Change Voluntary Challenge, which was included with this report. The measures reported to date resulted in CO_2 reductions of 812,722 tonnes per year. The report provided a chronological review of CAPP actions in the field of climate changes since 1989, a summary of member action plans, and a listing of new technologies and their impact on greenhouse gas emissions.
The commercialization of geothermal energy resources consists of a sequence of exploration, development, and utilization activities. Each of these activities are beset by both generic and project specific technical, environmental, and institutional constraints which must be adequately resolved before geothermal operations can be conducted. This report presents a summary of selected environmental activities conducted during the early planning stages of geothermal resource commercialization. Three representative activities are elaborated upon. These include preliminary environmental planning for geothermal energy development in the Medicine Lake Highlands of California; potential alternatives for non-electric use of the geothermal resource at East Mesa in Imperial County, California; and site specific studies of the impacts from using East Mesa geothermal fluids to irrigate selected crops and indigenous climax vegetation.
The present report describes the study conducted in co-operation with several agencies and organizations from Thailand and covers the energy and electricity requirements and the optimal expansion plans for the power generating system for this country up to year 2011. It is emphasized that the study was carried out by a team of experts from the Electricity Generating Authority of Thailand (EGAT), the National Economic and Social Development Board (NESDB), the National Energy Administration (NEA) and the Office of Atomic Energy for Peace (OAEP), who were fully responsible for all phases of the study, including the production of the present report. The IAEA's responsibility was to provide overall co-ordination and general guidance during the conduct of the study, as well as training and assistance in the implementation and use of the IAEA's computerized planning methodologies on the computer facilities of Thailand. Refs, figs and tabs.
Looking at all the indeterminate factors as a whole and regarding activity durations as independent random variables, the traditional stochastic network planning models ignore the inevitable relationship and dependence among activity durations when more than one activity is possibly affected by the same indeterminate factors. On this basis of analysis of indeterminate effect factors of durations, the effect factors-based stochastic network planning (EFBSNP) model is proposed, which emphasizes on the effects of not only logistic and organizational relationships, but also the dependent relationships, due to indeterminate factors among activity durations on the project period. By virtue of indeterminate factor analysis the model extracts and describes the quantitatively indeterminate effect f...
The objective of this study is to establish a construction plan for vibration analysis system of HANARO's rotating machinery. To achieve this purpose, as a first step, the references related to the vibration analysis system for the rotating machinery were investigated. In addition, to verify the possibility of condition monitoring of the pumps, vibration signals obtained from the vibration monitoring system were analyzed. The results show that using the accelerometers mounted on the bearing locations of the pumps can monitor the current status of the pump such as unbalance, misalignment, and bearing condition. Based on the results of this study, the construction plans for the vibration analysis system of HANARO have been established. The hardware of the vibration analysis system will be installed by the end of this year. It is expected that the developed vibration analysis system can be utilized for the realization of the preventive ...
The authors have been developing a 3D brain CT image display system for planning of craniofacial operations. This system helps doctors plan craniofacial operations on a graphic display (GD) terminal by rendering 3D images reconstructed from a set of slices. The authors reveal how the system generates 3D shapes of organs from given CT images and how it modifies or transforms the obtained shapes according to the user's request. The system functions now available are extraction and display of the skull and the skin, measurement of the distance between two points on the skull given through the GD terminal, and generating and eliminating a polygonal region arbitrarily given on the skull as an operative region. (Auth.).
In the past years I have been dealing with the following aspects of waste planning: a) waste reduction (regarding particularly home composting); b) transformation and reorganisation of waste collection systems; c) experimental introduction of a new way to pay for waste collection and treatment services, from ''tax'' to ''tariff''. In these years, I have been a consultant for municipalities in the planning of these three points. In the city (Venice) and in the Region I come from (''Veneto'') there are some of the most important Italian experiences about them. (orig).
Wildlife Monitoring System Schematic .......................... 40 ...... sentinel species - healthy fish are placed in an environment of water (where they arc not .... The way ir! which data for the fnre mdor study groups will be gathered tor managciacilt ...... Earth Resources Aircraft Program (ERAP) Camera ...
AbstractThe optimal definition of the size, shape and location of gross tumour volume is one of the most important steps in the planning of radiation therapy, and necessitates a proper...Full Text Available
An indoor radioactive survey is being conducted in an Italian district. Preliminary results identified a zone with significant radioactive levels, in which a new specific survey has been planned. In this paper attention is dedicated mainly to radon measurement technique and results.
BackgroundAttention-deficit/hyperactivity disorder (ADHD) is a common condition that often results in child and family functional impairments. Although there are evidence-based treatment...Full Text Available
IntroductionOut-of-school adolescents are often neglected when planning for tobacco prevention programmes whereas they are more vulnerable. Few studies exist in Nigeria about their...Full Text Available
BackgroundDespite having the largest population in Africa, Nigeria has no accurate population based data to plan and evaluate eye care services. A national survey was undertaken...Full Text Available
These sky images are scanned for point sources above a specified ... The threshold criteria are: a) Gold: >4 sigma in both the Soft AND Hard bands. b) Silver: ... Filtering: Currently, there is no plan for filtering within the GCN based ...
Milstar 2. (USA 115). 60A. Titan IV. Nov. 12, 1995. Install Docking Module on the Mir space. 396 km. Second of 9 planned flights. Space Shuttle Atlantis ...
The planned spallation source can be of considerable significance for biomedical basic research and for clinically relevant diagnostic and therapeutic applications. The following gives a brief description and explanations for its possible use in clinical medicine: I. Treatment of Malignant Tumors II. Production of Isotopes for Biochemical Investigations in Living Organisms for Diagnostic Purposes.
This report presents geologic considerations that are pertinent to the Remedial Action Plan for Slick Rock mill tailings. Topics covered include regional geology, site geology, geologic stability, and geologic suitability.
The CWDD injector has been shipped to Argonne National Laboratory, installed, and recommissioned. Commissioning progress, operational status, and future plans are reported. Operational experience at ANL is compared with that obtained at Culham.
BackgroundThe precision in carbon ion radiotherapy depends on the calibration of Hounsfield units (HU) as measured with computed tomography (CT) to water equivalence. This calibration...Full Text Available
Globally, sexually transmitted infections (STIs) represent a significant source of morbidity and disproportionately impact the health of women and children. The number of randomized controlled trials...Full Text Available
This paper discusses the quality assurance requirements for high-level canistered waste form products which would be acceptable for disposal in a deep geologic repository. A review plan and guidelines are provided.
The trade-off which must be established between the various functions of pumped-storage plants is examined. A compromise between supply security and economic planning can be found only by coordinated planning of pumped-storage units and thermal generation plants. A model used by Electricite de France (EDF) to ensure optimized daily planning of thermal and pumped-storage units is described. The model, called the DEMETER model, ensures the optimization of the daily planning of thermal and pumped-storage plants. The model iterates between two levels: coordination where the prices of the generated energy and the operating reserve are determined to adjust generation to load and keep a sufficient reserve; and decomposition where the schedule of each unit is optimized on the basis of the above prices and taking into account local constraints such as unavailability, and minimum shut down time. The role of EDF ...
When any new accelerator or storage ring is built that advances the state of the art, the diagnostic system becomes extremely important in tuning the facility to full specification. This paper will discuss the various diagnostic devices planned or under construction for the PSR and their connection into the control system.
There are a number of propagation issues that need further investigation for efficient system planning for EHF communication systems. Especially needed are better cloud and rain characterizations. A method for estimating one of the rain induced effects of interest, outage duration, is presented.
Technologies for materials, processes, and manufacturing that will provide safe, .... advanced energy conversion techniques, and pulsed inductive and ... duration antimatter storage and transportation, and methods for utilizing ...... EVA systems can be found in the EVA Technology Roadmap of the EVA Project Plan. ...
Full text.This paper describes a software tool for generation expansion planning based on dynamic programming, probabilistic production simulation, and environmental assessment. The aim is to determine the units needed to expand a given system in order to minimize either the cost or the environmental impact or some weighed function of the two. The problem of generation expansion planning is solved in stages using Tunnel Dynamic Programming (TDP) with Heuristic rules to limit the number of options analyzed. The production costing methodology is based on combining a probabilistic generation model known as the capacity outage table (COT) with the load duration curve (LDC) of the system to deduce a risk model from which the expected energy not supplied (EENS) is estimated. The generation model is built recursively using an efficient numerical convolution procedure and is combined at each step with the LDC to calculate the expected energy produced ...
The technology being evaluated is the Modified In-Situ (MIS) retorting process for raw shale oil production, combined with a Circulating Fluidized Bed Combustor (CFBC), for the recovery of energy from the mined shale. (VC)
The technology being evaluated is the Modified In-Situ (MIS) retorting process for raw shale oil production, combined with a Circulating Fluidized Bed Combustor (CFBC), for the recovery of energy from the mined shale. (VC)
This article puts the case for coal fired combined cycle gas turbine (CCGT) power plants. The need to gasify the coal for the CCGT, use of fluidised bed combustors or gasification systems, the difference in prices of coal and natural gas, and coal and natural gas reserves are discussed. (UK)
PurposeAuto-propagation of anatomical region-of-interests (ROIs) from the planning CT to daily CT is an essential step in image-guided adaptive radiotherapy. The...Full Text Available
Nineteen of 69 patients undergoing coronary angioplasty required immediate coronary surgery after the procedure. Six of these operations were planned as a result of angioplasty that failed without producing...Full Text Available
... Austrian Environment Minister Nikolaus Berlakovich called for such stress tests on Sunday (13 March) to make sure that nuclear power stations were quake-proof following Japan's massive earthquake and tsunami. Austria, a mountainous country rich in geothermal energy, has no NPPs and no plans to develop ...
Approximately 400 people die from extreme heat each year in the United States, and the risk of heat waves may increase as a result of global climate change. Despite the risk of heat-related morbidity...Full Text Available
Cancer treatment with ionizing radiation is often compromised by organ motion, in particular for lung cases. Motion uncertainties can significantly degrade an otherwise optimized treatment plan....Full Text Available
UNEP will provide in the first CPR quarterly report of 2011 the financial statements for 2010. ...for assessing and rating programme performance UNEP to work with the CPR to identify better ways of streamlining reporting requirements ...in 2011 to achieve the ratios requested by the CPR dependent on receipt of contributions originally planned for the
BackgroundTwo planned trials of pre-exposure prophylaxis tenofovir in Cambodia and Cameroon to prevent HIV infection in high-risk populations were closed due to activist pressure...Full Text Available
The aim of this project was to develop an understanding of the dynamical processes that evolve within an electric utility firm, and without it. This volume covers organizational dynamics and control, and planning under uncertainty. (DLC)
This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B ...
Caribou were extirpated from the Kenai Peninsula by 1912 and reintroduced via transplants from the Nelchina Herd in the mid 1960's and again in the mid 1980's. The reintroductions resulted in the establishment of five herds: the Kenai Mountains Herd, Kena...
Oct 13, 2000 ... The Air Force plans to use the Medevac Oxygen System on existing C-141 aircraft and future C-130J and C-130X aircraft equipped with a LOX ...
In the information age, information utilities like libraries are as sensitive to the stresses of change as any other organization. This article is a case study of a small, specialized medical library...Full Text Available
Cyber attacks on a hospital's computer network is a new crime to be reckoned with. Should your hospital consider internet insurance? The author explains this new phenomenon and presents a risk assessment for determining network vulnerabilities. PMID:11951384
BackgroundThe zinc-finger transcription factor GLI3 is an important mediator of Sonic hedgehog signaling and crucial for patterning of many aspects of the vertebrate body plan. In...Full Text Available
The `Hanford Facility Dangerous Waste Permit Application` is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit- Specific Portion. The scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Documentation included in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units. A checklist indicating where information is contained in the General Information Portion, in relation to the Washington State Department of Ecology guidance documentation, is located in the Contents Section. The intent of the General Information Portion is: (1) to provide an overview of the Hanford Facility; and (2) to assist in streamlining efforts associated with treatment, storage, and/or disposal unit-specific Part B permit application, ...
This report is a summary of the environmental status of the Hanford Site in 1989. It includes descriptions of the Site and its mission, the status of compliance with environmental regulations, planning and activities to accomplish compliance, environmental protection and restoration activities, and environmental monitoring. 97 refs., 67 figs., 14 tabs.
The Vision for Space Exploration will guide NASA's future human and robotic space activities. The broad range of human and robotic missions now being planned will require the development of new system-level capabilities enabled by emerging new technologie...
The FFTF Standby Plan, Revision 0, provides changes to the major elements and project baselines to maintain the FFTF plant in a standby condition and to continue washing sodium from irradiated reactor fuel. The Plan is consistent with the Memorandum of Decision approved by the Secretary of Energy on January 17, 1997, which directed that FFTF be maintained in a standby condition to permit the Department to make a decision on whether the facility should play a future role in the Department of Energy`s dual track tritium production strategy. This decision would be made in parallel with the intended December 1998 decision on the selection of the primary, long- term source of tritium. This also allows the Department to review the economic and technical feasibility of using the FFTF to produce isotopes for the medical community. Formal direction has been received from DOE-RL and Fluor 2020 Daniel Hanford to implement the FFTF standby decision. The ...
Designed primarily for Missouri vocational agricultural instructors participating in the Farm Business Management Analysis Program, this instructor's guide, consisting of 10 lessons, deals with adjusting a farm business to increase profits. The following topics are covered in the individual lessons: law and the farm family, planning income tax management, closing the record book and planning cash flow, evaluating family living expenses, determining the most profitable livestock enterprise, determining the most profitable cropping system, planning the farm marketing program, adjusting capital investments to increase net profit, planning for efficient labor use, and controlling costs. Included in each section are suggestions for a review of previous materials covered, an objective, motivational techniques, key points to be addressed in the lesson, information to be introduced during the lesson, ...
Purpose/ObjectivesTo describe the Heiney-Adams Recruitment Framework (H-ARF); to delineate a recruitment plan for a randomized, behavioral trial (RBT) based on H-ARF;...Full Text Available
The advantages of district heating as an environmental-friendly and energy-saving technique are reviewed. The role of district heating as part of the Dutch national plan to reduce the emission of acidification and greenhouse gases by respectively 50 and 25 percent is clarified. 12 Tabs. (A.S.).
The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. ...
This ETP defines the task and deliverables associated with the design, fabrication and testing of an improved spray wash system for the Rotary Mode Core Sampling (RMCS)Spray Wash Trailer.
Objectives:The study was planned to evaluate the efficacy and safety of Livwin (polyherbal formulation) in acute viral hepatitis.Materials...Full Text Available
Present methods for planning reliability improvement of launch vehicles are reviewed. A theoretical criterion for optimum allocation of resources for reliability improvement exists that requires equal marginal failure reduction for all elements to be impr...
The report, generated by a computerized data base system, presents a survey of operational and planned domestic utility flue gas desulfurization (FGD) systems, operational domestic particle scrubbers, and Japanese coal-fired utility FGD installations. It ...
Ever-changing audio technology requires that National Library Service NLS always be aware of developments and prepare carefully for any systematic changes that may be desired or required. Usefulness, cost effectiveness, thoughtful stewardship, and educate...
PurposeTo investigate the influence of inhomogeneity corrections on stereotactic treatment plans for non-small cell lung cancer and determine the dose delivered to the PTV and OARs.Full Text Available
The identification of the protein targets for dengue virus-specific T lymphocytes may be useful for planning the development of subunit vaccines against dengue. We studied the recognition by murine...Full Text Available
Ontario's Countdown Acid Rain program was formulated in 1985 and placed an annual SO{sub 2} emissions cap of 885 kilotonnes over the province from 1994. Caps were placed on emissions from the Inco nickel/copper smelter in Sudbury, the Falconbridge nickel/copper smelter in Sudbury, the Algoma iron ore sintering plant in Wawa, and Ontario Hydro fossil-fuel plants province-wide. Semi-annual reports are required of the companies, with the 6th report outlining the final planning phase and the 7th and later reports outlining implementation progress. This document summarizes the contents of the 7th set of reports and the responses of the government review team to each company's efforts. All companies have begun implementing abatement plans outlined in the final planning phase reports of December 1988 at a rapid pace and are generally on track in controlling emissions. However, all 4 company reports lack the ...
Proprioceptive sensory signals inform the CNS of the consequences of motor acts, but effective motor planning involves internal neural systems capable of anticipating actual sensory feedback....Full Text Available
Zone modeling permits taking account of the effect of load-relieving air conduction systems in the planning of HVAC plants. Although this only supplies average values for the degree of load and height of the fresh air layer rather than a detailed description of concentration and temperature distributions in the room, it is quite sufficient for the planning of load-relieving air conduction systems. Moreover, the cost of zone modeling in the planning of HVAC plants remains within reasonable limits. Upscale planning, instruments can thus be reserved for more exacting problems. (orig.) [Deutsch] Zonenmodelle erlauben die Wirkung lastmindernder Luftfuehrungen bei der Planung von RLT-Anlagen zu beruecksichtigen. Sie liefern zwar nur Mittelwerte fuer den Belastungsgrad und die Hoehe der Zuluftschicht und keine detaillierte Konzentrations- und Temperaturverteilungen im Raum. Diese Werte reichen jedoch fuer die ...
UK Nirex has announced four sites which it wishes to assess for the disposal of low-level and short-lived intermediate-level radioactive wastes. There is local opposition at all four of the potential sites. (U.K.).
The reserves and the mine are described. Planned capacity is 27.5 million tonnes per year of coal for the Sasol II and Sasol III liquefaction plants. There will be 7 longwall faces, 15 entry workings with shotfiring, and 19 entries with continuous miners.
Activities are reported in programs to locate, test, and select materials for borehole plugs near nuclear waste repositories. Background information concerning borehole plugging is presented and work to date is summarized. Borehole sealants considered are listed and recommended steps to plug boreholes are given. Planned research is summarized.
Purposes1. To determine the optimal pelvic nodal clinical target volume for post-operative treatment of endometrial cancer. 2. To compare the DVH of different treatment planning...Full Text Available
...research strategy and plans Aquatic resource monitoring research programs, EMAP and STAR grants Go To EMAP homepage Go To Top Bibliography References for survey designs, statistical analyses , program documentation, and monitoring reports. Reports, abstracts and links to electronic versions Go To Top Frequently Asked Questions ...
The data and analyses contained in this report reflect the initial characterization of construction and consolidation water in Cells 5 and 6 lysimeters. Therefore, the scope of this report will be to establish constituent levels and document dewatering activities completed to date.
Feb 19, 2009 ... Standard Practice for Military Marking. MIL-STD-130. K. 1/15/00. Identification Marking of U.S. Military Property. MIL-STD-2073-1. D. Notice 1 ...
The conventional IMRT planning process involves two stages in which the first stage consists of fast but approximate idealized pencil beam dose calculations and dose optimization and the second...Full Text Available
Here we develop an argument in support of sequencing a garter snake (Thamnophis sirtalis) genome, and outline a plan to accomplish this. This snake is a common, widespread, nonvenomous...Full Text Available
Accurate dose calculation in radiation treatment planning is most important for successful treatment. Since human body is composed of various materials and not an ideal shape, it is not easy to calculate the accurate effective dose in the patients. Many methods have been proposed to solve inhomogeneity and surface contour problems. Monte Carlo simulations are regarded as the most accurate method, but it is not appropriate for routine planning because it takes so much time. Pencil beam kernel based convolution/superposition methods were also proposed to correct those effects. Nowadays, many commercial treatment planning systems have adopted this algorithm as a dose calculation engine. The purpose of this study is to verify the accuracy of the dose calculated from pencil beam kernel based treatment planning system comparing to Monte Carlo simulations and measurements especially in inhomogeneous region. ...
The offline adaptive radiotherapy (ART) has been used to effectively correct and compensate the prostate motion and reduce the required margin. The efficacy depends on the characteristics of...Full Text Available
separation and arrival planning to the Air Traffic Service Providers (ATSP). ... a safe, highly efficient flow of traffic from enroute into TRACON airspace that reliably ..... AGARD Lecture Series 200 Presentation, Madrid, Spain, Paris, France, and ...
...2010-10-01 2010-10-01 false Use of Federal Supply Schedules. 8.404 Section 8.404 Federal...REGULATION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.404 Use of Federal Supply...
...false Priorities for use of Government supply sources. 208.002 Section 208...ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES 208.002 Priorities for use of Government supply sources. (a)(1)(v)...
...Amendments to Sections 8-2:704 (Use of Certain Fuel Oils Forbidden), 8-2:705 (Use of Certain Coal Forbidden...and Nitrogen Oxides. Section 801(Sulfur Content of Fuel Oils), subsection 801.1 Section 802(Sulfur...
...Department of Environmental Control to ASARCO Incorporated. (B) Amended Administrative...Department of Environmental Control to ASARCO Incorporated. (C) Second Amended...Department of Environmental Control to ASARCO Incorporated. (ii) Additional...
...analysis for all of the stacks except the ASARCO stacks. (i) Incorporation by reference...1985 (except for materials pertaining to ASARCO), and January 28, 1986 (except for meterials pertaining to ASARCO and Appendix A). (19) On...
...capacity, and ownership of all planned and existing onshore pipelines, storage facilities, refineries, petrochemical...will be served by the port, including: (i) Onshore pipelines; (ii) Storage facilities; (iii)...
...treated for leukemia. B' s physician, who is employed by the HMO, is considering a treatment plan that includes six-mercaptopurine, a drug for treating leukemia in most children. However, the drug could be fatal if taken by a small percentage of...
The purpose of this report is to describe the sampling approaches, modifications made to the 100 Area and 300 Area component of the RCBRA Sampling and Analysis Plan, summarize validation efforts, and provide sample identification numbers.
Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.
The applications of neutron reflectometry to study dynamic phenomena at surface and interfaces have been restricted so far. This was mainly due to the low intensity of neutron sources, but now high-intensity spallation neutron sources are under construction in Japan (J-PARC) and US (SNS). We are planning to install a spin-echo option on the J-PARC neutron reflectometer with horizontal sample geometry for studies of dynamics of surfaces and interfaces. This option is based on the resonance spin-echo method and aimed at dynamics up to hundreds of nanoseconds. In this contribution, the plan and status of development are introduced together with the principle and characteristics of this option.
The Office of Civilian Radioactive Waste Management (OCRWM) is executing a plan for improvement of the United States Nuclear Waste Management Program. As part of the plan, OCRWM is performing a systems engineering analysis of both the physical system, i.e., the Nuclear Waste Management System (NWMS), and the programmatic functions that must be accomplished to bring the physical system into being. The functional analysis effort is being performed by two separate teams working in parallel, one of which addresses the physical system functions and the other the programmatic functions. This paper presents information on the analysis of the programmatic functions.
Taiwan`s LNG consumption is planned to rise more than threefold over the next four years as medium-term plans to develop power generation facilities increasingly rely on gas-fired combined-cycle stations to avoid the threat of power shortages. State-run Taiwan Power Company (Taipower) expects its LNG consumption to rise from 1.1 mn tonnes in 1996 to 3.4 mn tonnes in the year 2000. By then the first of several gas-fired private power stations is expected to enter service, further increasing Taiwan`s total LNG requirement for power generation. (Author)
The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required.
Positron-emission tomography (PET) and PET/CT (computed tomography) are becoming increasingly important for diagnosis and treatment of cancer. Clinically relevant changes can sometimes be seen on PET that are not seen on other imaging modalities. However, PET is not suitable for guiding biopsy as the images are not obtained in real-time. Therefore, our research group has begun developing a concept for PET/CT-guided interventional procedures. This paper presents the rationale for this concept, outlines our research plan, and includes an initial study to evaluate the relative sensitivity of CT and PET/CT in detecting suspicious lesions. (orig.)
This paper presents a new algorithm for the optimal long-range generation planning for a thermal system with pumped-storage plants. The algorithm is based upon the analytical production costing model developed under the assumption of Gaussian probabilistic distribution of random load fluctuations and plant outages. The optimization problem consists of the master problem to determine the annual investment, and the pumped-storage subproblem to determine the optimal pumped-storage operation. The master problem is formulated as a Hamiltonian minimization problem, and the pumped-storage subproblem is solved using the concept of peak-shaving operation on the original load curve.
This paper presents a new algorithm for the optimal long-range generation planning for a thermal system with pumped-storage plants. The algorithm is based upon the analytical production costing model developed under the assumption of Gaussian probabilistic distribution of random load fluctuations and plant outages. The optimization problem consists of the master problem to determine the annual investment, and the pumped-storage subproblem to determine the optimal pumped-storage operation. The master problem is formulated as a Hamiltonian minimization problem, and the pumped-storage subproblem is solved using the concept of peak-shaving operation on the original load curve.
The NuMI proton beam at Fermilab currently delivers 120 GeV protons to the neutrino production target with design beam power capability to 400 kW. Upgrade capability to 700 kW is being prepared, with planning toward delivering 2.3 MW beam provided by the Project X accelerator upgrade plan. We report on the system of beam diagnostics and control used in operation of the NuMI beam. Also considered are the steps to provide a robust system for transport and targeting beam of 2 MW and beyond.
This paper presents a framework for creating a common spatial canvass that can bring together considerations of resource availability, infrastructure reliability, and development costs while strategizing renewable energy investment. We describe the underlying models and methodologies that annotate an investment plan for potential sites over a time-period with costs and constraints which may be imposed on distance from infrastructure, system impact on infrastructure, and policy incentives. The framework is intended as an enabler for visualization, optimization and decision making across diverse dimensions while searching for lucrative investment-plans.
Contract No. DACA 90-8l-C-oo72 directs that a basewide energy study be accomplished for the Mannheim and Pirmasens Military Communities, Federal Republic of Germany. The project is identified as Energy Engineering Analysis Program (EEAP) Package No. 5. The overall objective of the study is to produce a systematic plan of improvement projects that will reduce by 1985 the energy consumption in compliance with the Army Facilities Energy Plan without decreasing the readiness posture of the Army.
SO/sub 2/ concentrations in the Stuttgart air have been measured continuously since 1965. The two measuring points were located at the bottom of the Stuttgart city basin and 900 m east on the side of one of the surrounding hills. Long-term curves of pollutant loads have been established in consideration of meteorological parameters, as well as curves showing the average daily, weekly, and yearly pollution. The information thus gained may help to plan air pollution abatement measures in city planning.
This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.
A synthesis of papers based on the United Nations Environment Programme meeting on the ozone layer, Washington DC, this book contains valuable information on ongoing and planned activities concerned with stratospheric ozone problems, and presents the recommendations for further action resulting from the meeting. Possible changes in the characteristics of the ozone layer are discussed, together with the environmental, ecological, climatic, economic, and health implications of stratospheric ozone depletion. A comprehensive survey of current research in five European countries, the USA, Canada, and Australia is included and the volume is concluded by the UNEP report of the meeting and a world plan of action.
High-voltage transmission lines can pose an environmental problem, especially in countries where the electricity production is at a distance from the demand location. Planning, construction, and operation of high voltage transmission lines should be conducted within a comprehensive environmental policy, which may include assessment of visual impact, landscape and wildlife protection, and reduction of health risks. This paper reviews the environmental policies and action in planning, construction, and operation as developed by the utilities members of the Union Internationale des Producteurs et Distributeurs d`Energie Electrique (UNIPEDE). The paper also presents a brief outline of the health issues associated with the effects of electromagnetic fields to humans.
High-voltage transmission lines can pose an environmental problem, especially in countries where the electricity production is at a distance from the demand location. Planning, construction, and operation of high voltage transmission lines should be conducted within a comprehensive environmental policy, which may include assessment of visual impact, landscape and wildlife protection, and reduction of health risks. This paper reviews the environmental policies and action in planning, construction, and operation as developed by the utilities members of the Union Internationale des Producteurs et Distributeurs d'Energie Electrique (UNIPEDE). The paper also presents a brief outline of the health issues associated with the effects of electromagnetic fields to humans.
Brief comments are given on the evolution of the institutional nature of ENEL (Italian Electricity Board) as it relates to the framework of legislation for the nationalization of the utility in December, 1962. Special attention is given to the development of legislative criteria to allow the creation of a rate structure, in the case of autoproduction by industry, that would stimulate national economic growth. A discussion is also made of the changing role of ENEL as it responds to the planning objectives cited in the Italian National Energy Plan which calls for a more integrated effort by the regional governments and the Electricity Board in the management of natural resources.
The insertion of innovative technologies to replace baseline technologies used in cost estimation and planning of DOE D&D projects is considered a high risk endeavor by project and programmatic decision makers. It is almost always considered safer to go with the {open_quotes}devil you know{close_quotes} than use a new or untried technology, methodology or system. The decision on the specific technology to be utilized to remediate a problem is often made months or years in advance of execution, and the highly proscriptive documentation of agreements necessary to obtain stakeholder and regulator approval of remedial plans is often counterproductive to considering improved technologies.
The CyberKnife Robotic Radiosurgery System (Accuracy Incorporated, Sunnyvale, CA, USA) is used worldwide to treat tumors and neurological disorders anywhere in the body with sub-millimetre beam delivery accuracy. Accuracy has developed a number of new technologies in recent years to enhance the treatment of cancer patients. Such new technologies include a fast Monte Carlo Dose Calculation algorithm, Sequential Optimization dose planning, the IrisTM Variable Aperture Collimator, an 800 MU/min Linear Accelerator, and Optimized Path Traversal. These technologies enable physicists and physicians to plan treatments quickly and easily and deliver them with unrivalled accuracy and precision
In the construction work for the Unit No.5 Turbine Building at Hamaoka Nuclear Power Station, the collaboration work for the planning and the coordination of the building construction and the machinery installation was carried out utilizing three-dimensional computer aided design (3D CAD) information. It was the first time in Japan for a building constructor and a plant manufacturer to work together, exchanging 3D CAD data of the whole building and adjusting the construction schedule. It was made possible to confirm the correspondence concerning the planning of both companies from the primary stage of the project by the total process simulation and to adjust on-going work precisely by the partial process simulation.
In the construction work for the Unit No.5 Turbine Building at Hamaoka Nuclear Power Station, the collaboration work for the planning and the coordination of the building construction and the machinery installation was carried out utilizing three-dimensional computer aided design (3D CAD) information. It was the first time in Japan for a building constructor and a plant manufacturer to work together, exchanging 3D CAD data of the whole building and adjusting the construction schedule. It was made possible to confirm the correspondence concerning the planning of both companies from the primary stage of the project by the total process simulation and to adjust on-going work precisely by the partial process simulation.
With the advent of intensity-modulated radiation therapy (IMRT), the inclusion of heterogeneity corrections is further complicated by the conformal delivery of many small beams forming steep dose gradients. Radiation treatment planning has evolved to take into account even small changes in tissue density so that the dose to tumor can be further optimized. However, different treatment planning systems incorporate different heterogeneity correction algorithms, and it is unclear whether any of these algorithms are superior to others in terms of accurately predicting delivered radiation doses relative to measurement in a clinical setting. The purpose of this study was to determine the accuracy of heterogeneity dose calculations from two widely used IMRT treatment planning systems (Pinnacle and Corvus) against measurement. These two systems handle heterogeneity dose corrections by means of a collapsed-cone convolution ...
A fast production scheduling algorithm suitable for generation expansion studies is described in this paper. It can handle several independent rivers, thermal plants, pumped storage plants, import, export, and internal non-firm markets. Inflows and load are deterministic and a one-reservoir limit is imposed on each river. The scheduling problem is formulated as a generalized network problem which is efficiently solved by an adaption of the simplex method. The algorithm is part of a program developed by Hydro-Quebec to conduct preliminary evaluations of alternative expansion plans. The program and the scheduling algorithm are presented.
A fast production scheduling algorithm suitable for generation expansion studies is described in this paper. It can handle several independent rivers, thermal plants, pumped storage plants, import, export, and internal non-firm markets. Inflows and load are deterministic and a one-reservoir limit is imposed on each river. The scheduling problem is formulated as a generalized network problem which is efficiently solved by an adaption of the simplex method. The algorithm is part of a program developed by Hydro-Quebec to conduct preliminary evaluations of alternative expansion plans. The program and the scheduling algorithm are presented.
This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the ...
Purpose: The aim of this study was to assess interinstitutional variations in planning for stereotactic body radiation therapy (SBRT) for lung cancer before the start of the Japan Clinical Oncology Group (JCOG) 0403 trial. Methods and Materials: Eleven institutions created virtual plans for four cases of solitary lung cancer. The created plans should satisfy the target definitions and the dose constraints for the JCOG 0403 protocol. Results: FOCUS/XiO (CMS) was used in six institutions, Eclipse (Varian) in 3, Cadplan (Varian) in one, and Pinnacle3 (Philips/ADAC) in one. Dose calculation algorithms of Clarkson with effective path length correction and superposition were used in FOCUS/XiO; pencil beam convolution with Batho power law correction was used in Eclipse and Cadplan; and collapsed cone convolution superposition was used in Pinnacle3. For the target volumes, the overall coefficient of variation was 16.6%, and the ...
This document is the third annual revision of the plans and schedules for implementing the Federal Facility Agreement (FFA) compliance program, originally submitted in 1992 as ES/ER-17&D1, Federal Facility Agreement Plans and Schedules for Liquid Low-Level Radioactive Waste Tank Systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This document summarizes the progress that has been made to date in implementing the plans and schedules for meeting the FFA commitments for the Liquid Low-Level Waste (LLLW) System at Oak Ridge National Laboratory (ORNL). Information presented in this document provides a comprehensive summary to facilitate understanding of the FFA compliance program for LLLW tank systems and to present plans and schedules associated with remediation, through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, of LLLW tank systems that ...
The US Department of Energy (DOE) is preparing to perform significant remediation activities of the sites for which it is responsible. To accomplish this, it is preparing a corporate global plan focused on activities over the next decade. Significant in these planned activities is the transportation of the waste arising from the remediation. The costs of this transportation are expected to be large. To support the initial assessment of the plan, a cost estimating model was developed, peer-reviewed against other available packaging and transportation cost data, and applied to a significant number of shipping campaigns of radioactive waste. This cost estimating model, known as the Ten-year Plan Transportation Cost Model (TEPTRAM), can be used to model radioactive material shipments between DOE sites or from DOE sites to non-DOE destinations. The model considers the costs for (a) recovering and processing ...
The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facility Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the Department of Energy Oak Ridge Field Office (DOE-OR), the US Environmental Protection Agency (EPA)-Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA was January 1, 1992. Section 9 and Appendix F of the agreement impose design and operating requirements on the Oak Ridge National Laboratory (ORNL) liquid low-level radioactive waste (LLLW) tank systems and identify several plans, schedules, and assessments that must be submitted to EPA/TDEC for review or approval. The initial issue of this document in March 1992 transmitted to EPA/TDEC those ...
High dose rate (HDR) brachytherapy for treating a cervix carcinoma has become popular, because it eliminates many of the problems associated with conventional brachytherapy. In order to improve the clinical effectiveness with HDR brachytherapy, a dose calculation algorithm, optimization procedures, and image registrations need to be verified by comparing the dose distributions from a planning computer and those from a humanoid phantom. In this study, the humanoid phantom was fabricated in order to verify the absolute doses and the relative dose distributions. The measured doses from the humanoid phantom were then compared with the treatment planning system for the dose verification. The humanoid phantom needs to be designed such that the dose distributions can be quantitatively evaluated thermoluminescent dosimeter (TLD) chips with a dimension of 1/8 and film dosimetry with a spatial resolution of <1 mm used to measure the radiation ...
This paper provides guidance in the definition, documentation, measurement, enhancement of processes, and validation of a strategic plan for configuration management (CM). The approach and methodology used in establishing a strategic plan is the same for any enterprise, including the Department of Energy (DOE), commercial nuclear plants, the Department of Defense (DOD), or large industrial complexes. The principles and techniques presented are used world wide by some of the largest corporations. The authors used industry knowledge and the areas of their current employment to illustrate and provide examples. Developing a strategic configuration and information management plan for DOE Idaho Field Office (DOE-ID) facilities is discussed in this paper. A good knowledge of CM principles is the key to successful strategic planning. This paper will describe and define CM elements, and discuss how CM integrates ...
Significant environmental issues and regulatory proceedings in Alberta were discussed. The Mackenzie Valley Pipeline Project was reviewed in relation to the Deh Cho First Nation's advanced actions in the federal court to enjoin the review panel from proceeding with the review process. The Deh Cho First Nation is seeking a declaration that the plan violates their rights under the Canadian Charter of Rights and Freedoms and the Constitution Act. Various regulatory and government agencies have now developed a plan to coordinate their different regulatory processes and approvals in the Cooperation Plan for the Environmental Impact Assessment and Regulatory Review of the Northern Gas Pipeline project. The Deh Cho allege that they were not afforded the opportunity to participate in the development and implementation of the plan. A review panel plans to proceed once the ...
This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes ...
With the end of the Cold War and the election of President Clinton, the Department of Energy (DOE) set a new course which began with the publication of its first departmental strategic plan in April 1994. Entitled ``Fueling a Competitive Economy, it provided the framework and shared vision for meeting responsibilities in energy, national security, environmental quality, and science and technology. The strategic plan was the guidepost for the formulation of the Department`s FY 1996, FY 1997, and FY 1998 budgets and was critical to the development of the Department`s Strategic Alignment Initiative, designed to save $1.7 billion over five years. This current plan, which has been significantly improved through a very close consultation process with Congress and customers stakeholders, takes DOE to the next important performance level by being more directly linked to actions and results. It defines a strategic goal for each of ...
In January 2001, Husky Oil Operations Limited (Husky), in joint-venture with Petro-Canada, submitted a Benefits Plan for the White Rose Development to the Canada-Newfoundland and Labrador Offshore Petroleum Board (C-NLOPB). It was prepared following the Canada-Newfoundland and Labrador Atlantic Accord Implementation Act and the Canada-Newfoundland and Labrador Atlantic Accord Implementation (Newfoundland) Act. In December 2001, the C-NLOPB approved the White Rose Benefits Plan. This document described the work that Husky proposes to undertake within its significant discovery license areas 1043 and 1044 for the development of the South White Rose Extension (SWRX) Tie-back to the White Rose Floating Production, Storage and Offloading (FPSO) vessel as it will require an amendment to the original White Rose Development Plan and is subject to the review and approval of the C-NLOPB. The statutory requirements as well as the ...
This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures ...
This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other ...
US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this ...
The Anisotropic Analytical Algorithm (AAA) is a new pencil beam convolution/superposition algorithm proposed by Varian for photon dose calculations. The configuration of AAA depends on linear accelerator design and specifications. The purpose of this study was to investigate the accuracy of AAA for an Elekta SL25 linear accelerator for small fields and intensity modulated radiation therapy (IMRT) treatments in inhomogeneous media. The accuracy of AAA was evaluated in two studies. First, AAA was compared both with Monte Carlo (MC) and the measurements in an inhomogeneous phantom simulating lung equivalent tissues and bone ribs. The algorithm was tested under lateral electronic disequilibrium conditions, using small fields (2x2 cm"2). Good agreement was generally achieved for depth dose and profiles, with deviations generally below 3% in lung inhomogeneities and below 5% at interfaces. However, the effects of attenuation and scattering close to the bone ribs were not fully taken into ...
This Maintenance Implementation Plan (MIP)was developed for implementation of the U.S. Department of Energy (DOE) Order 4330.4A, A Maintenance Implementation Program (DOE 1990) which has been replaced by 4330.4B (DOE 1994) at the Hanford Site SWM complex. It addresses maintenance functions associated with SWM, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for SWM was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The objective of this MIP is to provide baseline information for the control and execution of SWM Maintenance activities relative to the requirements of Order 4330.4B, Chapter II. (Nuclear Facilities) It also describes actions that are planned to achieve compliance. Section 2.0 of this MIP summarizes the mission, history, and future ...
A method of reconstructing three-dimensional, in vivo dose distributions delivered by intensity-modulated radiotherapy (IMRT) is presented. A proof-of-principle experiment is described where an inverse-planned IMRT treatment is delivered to an anthropomorphic phantom. The exact position of the phantom at the time of treatment is measured by acquiring megavoltage CT data with the treatment beam and a research prototype, flat-panel, electronic portal imaging device. Immediately following CT imaging, the planned IMRT beams are delivered using the multiple-static field technique. The delivered fluence is sampled using the same detector as for the CT data. The signal measured by the portal imaging device is converted to primary fluence using an iterative phantom-scatter estimation technique. This primary fluence is back-projected through the previously acquired megavoltage CT model of the phantom, with inverse attenuation correction, to yield an ...
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement ...
This work describes an experimental verification of the two-photon dose calculation engines available on the Helax-TMS (version 6.1) commercial radiotherapy treatment planning system. The performance of the pencil beam convolution and the collapsed cone superposition algorithms was examined for 4, 6, 15 MV beams, under a range of clinically relevant irradiation geometries. Comparisons against measurements were carried out in terms of absolute dose, thus assessment of the accuracy of monitor unit (MU) calculations was also carried out. Results show that both algorithms agree with measurement to acceptable tolerance levels in most cases in homogeneous water-equivalent media irradiated under full scatter conditions. The collapsed cone algorithm slightly overestimates the penumbra width and this is mainly due to discretization effects of the fluence matrix. The accuracy of this algorithm strongly depends on the resolution of the patient density matrix. It is ...
The number of ERP (Enterprise Resource Planning) implementations within the oil industry has increased substantially in the past years. PETROBRAS has recently developed a business case, a 10 steps methodology developed by Symnetics-Benchmarking Partners (management consultancy), aimed at enhancing strategic and tangible ROI - Return on Investment of IT projects. The Business Case has not only provided alignment of PETROBRAS strategies with ERP capabilities, but also identified process gaps and opportunities for improvement as well as developing a high level implementation plan including timing, costs and potential benefits. Anticipated economic gains were mainly focused on the following business processes: materials management (30%), planning and controlling (25%), project management (24%) and order fulfillment (14%). PETROBRAS has chosen a phased approach for implementing the ERP. Two scenarios were considered: time, cost, ...
The main aim of the project is to model the energy wood business and total logistics in a certain large region. First, wood utilisation locations inside this area are examined; the most important ones are the wood processing factories, and the heating- and power plants. After that, wood potentials in the forests of the area are evaluated in sub-areas suitable in size and sufficiently detailed for further evaluations. For that purpose, the most valuable source data are forest management plans, up to ten years forward, on which basis the wood fuel potentials can be evaluated following sustainable development. In Finland there are extensive and detailed data bases storing forest information and it is possible to collect necessary data for a data base applicable to our calculations. In logistical sense it is important to know, by which delivery chains the economically best and desired results are achieved. The software prototype based on data base is modelled and ...
A complete analysis is performed to simulate biomass production incorporated into a realistic whole farm situation, including or replacing a typical crop mix. Representative farms are constructed to accommodate such simulation. Four management systems are simulated for each firm, with each simulation depicting a different crop mix and/or use of different farming technologies and production methods. The first simulation was a base farm plan in which the operator would maintain the historical crop mix for the area, participate in all price support programs, and not participate in either a conservative reserve or a biomass production program. In the second simulation, the operator would again maintain the historical crop mix, would not participate in a conservation reserve or biomass production program, and would be ineligible to participate in any price support system. The third simulation introduced the Conservation Reserve Program (CRP) and included participation ...
A complete analysis is performed to simulate biomass production incorporated into a realistic whole farm situation, including or replacing a typical crop mix. Representative farms are constructed to accommodate such simulation. Four management systems are simulated for each firm, with each simulation depicting a different crop mix and/or use of different farming technologies and production methods. The first simulation was a base farm plan in which the operator would maintain the historical crop mix for the area, participate in all price support programs, and not participate in either a conservative reserve or a biomass production program. In the second simulation, the operator would again maintain the historical crop mix, would not participate in a conservation reserve or biomass production program, and would be ineligible to participate in any price support system. The third simulation introduced the Conservation Reserve Program (CRP) and included participation ...
This inspection plan is written to meet the requirements of WAC 173-303 for operations of a TSD facility. Owners/operators of TSD facilities are required to inspection their facility and active waste management units to prevent and/or detect malfunctions, discharges and other conditions potentially hazardous to human health and the environment. A written plan detailing these inspection efforts must be maintained at the facility in accordance with Washington Administrative Code (WAC), Chapter 173-303, ``Dangerous Waste Regulations`` (WAC 173-303), a written inspection plan is required for the operation of a treatment, storage and disposal (TSD) facility and individual TSD units. B Plant is a permitted TSD facility currently operating under interim status with an approved Part A Permit. Various operational systems and locations within or under the control of B Plant have been permitted for waste management activities. ...
Purpose: An inverse treatment planning algorithm for tomotherapy is described. Methods and Materials: The algorithm iteratively computes a set of nonnegative beam intensity profiles that minimizes the least-squares residual dose defined in the target and selected normal tissue regions of interest. At each iteration the residual dose distribution is transformed into a set of residual beam profiles using an inversion method derived from filtered backprojection image reconstruction theory. These 'residual' profiles are used to correct the current beam profile estimates resulting in new profile estimates. Adaptive filtering is incorporated into the inversion model so that the gross structure of the dose distribution is optimized during initial iterations of the algorithm, and the fine structure corresponding to edges is obtained at later iterations. A three dimensional, kernel based, convolution/superposition dose model is used to compute dose during each iteration. ...
The present conference on U.S. space transportation systems development discusses opportunities for aerospace students in prospective military, civil, industrial, and scientific programs, current strategic conceptualization and program planning for future U.S. space transportation, the DOD space transportation plan, NASA space transportation plans, medium launch vehicle and commercial space launch services, the capabilities and availability of foreign launch vehicles, and the role of commercial space launch systems. Also discussed are available upper stage systems, future space transportation needs for space science and applications, the trajectory analysis of a low lift/drag-aeroassisted orbit transfer vehicle, possible replacements for the Space Shuttle, LEO to GEO with combined electric/beamed-microwave power from earth, the National Aerospace Plane, laser propulsion to earth orbit, and a performance analysis for a ...
A closed economic system was assumed for the Veneto Region (Italy) in order to define an appropriate input-output model and assess the future economic and environmental impacts of proposed actions for energy source development and economic growth. Present and forecasted energy demands (to the year 2000) were determined by energy source, e.g., natural gas, coal, petroleum and hydropower for the different consuming sectors - agriculture, transportation, industry, etc. Forecasts were made of the air pollution expected as a result of different types of energy and technology inputs for each sector. These considered planned retrofits towards clean combustion systems. Costs were estimated for the implementation of proposed pollution abatement measures, as well as, for the effects of energy use related environmental damage and measures to restore the environment. Some of the factors taken into account were: the regional impacts of the Italian National Energy ...
Since 1978 the United States Department of Energy`s (DOE) International Safeguards Program has conducted policy analysis, strategies and technology development, international cooperation and training to support the formulation and implementation of international safeguards. The end of the Gulf War (1991), the end of the Cold War (1992), and the trend towards regionalization of safeguards has led to increased US and international attention to the threat of nuclear weapons proliferation and the need for significantly greater support to nonproliferation policy making and implementation activities. As a result, DOE`s International Safeguards Program has undergone substantial growth and has continued to focus its resources on the priority issues which are part of today`s and tomorrow`s world. In order to effectively and efficiently conduct and manage these activities the International Safeguards Program has developed and continues to refine and implement a strategic ...
We are building the Schenberg gravitational wave detector at the Physics Institute of University of Sao Paulo as programmed by the Brazilian Graviton Project. The antenna and its vibration isolation system are already built, and we have made a first cryogenic run for an overall test, in which we measured the antenna mechanical Q (figure of merit). We also have built a 10.21 GHz oscillator with phase noise performance better than -120 dBc at 3.2 kHz to pump an initial CuAl6% two-mode transducer. We plan to prepare this spherical antenna for a first operational run at 4.2 K with a single transducer and an initial target sensitivity of h #approx# 2 x 10"-"2"1 Hz"-"1"/"2 in a 50 Hz bandwidth around 3.2 kHz soon. Here we present details of this plan and some recent results of the development of this project.
Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes ...
WIPP, intended for underground permanent disposal of defense transuranic waste, is located 40 km east of Carlsbad at a depth of 655 m in the salt beds of the 600-m thick Permian Salado Formation. It will consist of 56 ``rooms`` each 91.5 m long, 10 m wide, and 4 m high, grouped in 8 ``panels`` of 7 rooms each. About 7.5 km of access drifts will also be provided. Excavation began in 1982 and surface/access/test facilities and one panel were completed by 1988, many years before it could be used. Current plans are to start emplacing waste in WIPP in 1998 and continue for 35 years. The north- south drift E140 is the widest (25 ft) of the four main north-south drifts and is the main north-south passage. Plans to conduct experiments with waste in 1993 were abandoned, and the plan now is to use panel 1 for permanent disposal of waste starting in 1998. The stability evaluation resulted in the conclusion that, while it would be ...
This paper reports the result obtained during fiscal 1994 on a demonstration research on photovoltaic power generating systems. Solar cells with an output of 750 kW, storage battery facilities with an output of 3,058 kWh, three DC-AC converters with a rating of 250 kW, and a diesel generator with an output of 300 kW having been installed up to the previous fiscal year were combined to perform comprehensive adjustments and tests such as battery charge/discharge tests and AC parallel operation tests. The battery charge/discharge tests revealed that the 10 hour rate discharge capacity meets the specifications, and the batteries are free of deterioration after a demonstration operation of about 4.5 months. Difference between the power generation record and the planned value is thought due to the following reasons: the array output data in a power line connected system come about 90% of the simulation result due to correction coefficient for the solar cell conversion ...
This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an ...
The Underground Hydroelectric Pumped Storage (UHPS) Program Plan describes in detail the planned activities and expected accomplishments in the conduct of UHPS technology development and validation envisioned in the 1976 to 1990 time frame. This document describes the program objectives, implementation strategy, and management methodology. The concept of underground hydroelectric pumped storage is fully directed to application in the electric utility industry. This technology involves using electrical energy generated by base-load plants during off-peak load periods to drive a high-head pump/turbine which pumps water from a lower reservoir to a substantially elevated (upper) reservoir corresponding to a head of 1000 m or so. The upper reservoir is at ground level and the lower reservoir is below ground. Then, during peak-load periods, water in the upper reservoir is allowed to flow to the lower reservoir which, in turn, drives a hydraulic ...
In Rep. of Korea, active safeguards technology development suitable to phase of a nuclear advanced country is necessary because of below reasons. First reasons are '6th ranked position in the nuclear energy generation all over the world', 'continuously increased outcomes in the various nuclear fields such as research or patent', 'strengthened intention of the new government for nuclear industries', and 'weakness of the R and D foundation related to the safeguards technology'. Second reasons are optimization necessity of the effectiveness and efficiency of safeguards according to enlargement of the SSAC (State Systems of Accounting for and Control) role. The reason of the enlargement of the SSAC is IAEA IS (Integrated Safeguards) application for Korea. Third reasons are necessity for the systematic national development plan considering the Korea R and D level and the degree of the difficulty of technology. This is to say, there is necessity of the system ...
In this paper we apply stochastic programming modelling and solution techniques to planning problems for a consortium of oil companies. A multiperiod supply, transformation and distribution scheduling problem - the Depot and Refinery Optimization Problem (DROP) - is formulated for strategic or tactical level planning of the consortium's activities. This deterministic model is used as a basis for implementing a stochastic programming formulation with uncertainty in the product demands and spot supply costs (DROPS), whose solution process utilizes the deterministic equivalent linear programming problem. We employ our STOCHGEN general purpose stochastic problem generator to 'recreate' the decision (scenario) tree for the unfolding future as this deterministic equivalent. To project random demands for oil products at different spatial locations into the future and to generate random fluctuations in their future prices/costs a stochastic input data ...
The united research plan named 'Boiling' is created on the basis of several cryogenic research projects developed by experts in Russia and Ukraine for International Space Station. The 'Boiling' plan includes 8 first experiments aimed at investigating the influence of microgravity on boiling processes, heat transfer and hydrodynamics in liquid helium being either under normal or superfluid conditions. The experiments are supposed to be carried out with individual cells collected inside a single cryogenic onboard experimental facility. The international research program experiments are characterized by the following features: utilization of several artificially simulated microgravity levels, owing to rotation of the experimental helium cryostat; visualization of the processes that occur in liquid helium; research of boiling and hydrodynamics both in a large volume of stationary liquid, and in a liquid flow running through a channel. Upon ...
This SPEC (Systems and Procedures Exchange Center) kit provides a sample of excerpts from technical and planning documents contributed by 40 Association of Research Libraries (ARL) member libraries that are planning to install or have already implemented optical disc technology. Selected to represent a variety of media and applications, the excerpts address general as well as technical issues. Comments received in telephone interviews with contributors, as well as with other ARL members whose endeavors are not represented in this kit, are incorporated in a concise summary which discusses the overlapping and interrelated concerns of technical considerations, management issues, and impact on user services. In addition, the following original documents are included: (1) a descriptive list of optical disc technology terms from the National Library of Canada; (2) planning documents from the libraries of the Massachusetts ...
The work reported here encompasses analyses of specific potential spill scenarios for oil exploration activity planned offshore of Namibia. The analyses are carried out with the SINTEF Oil Spill Contingency and Response (OSCAR) 3-dimensional model systems. A spill scenario using 150 m{sup 3} of marine diesel demonstrates the rapidity with which such a spill will dissipate naturally, even in light winds. Vertical and horizontal mixing bring subsurface hydrocarbon concentrations to background levels within a few days. A hypothetical 10 day blowout scenario releasing 11,000 bbl per day of light crude oil is investigated in terms of the potential for delivering oil to selected bird and marine mammal areas along the Namibian coast. Worst case scenarios are selected to investigate the potential mitigating effects of planned oil spill response actions. Mechanical recovery significantly reduces, and in some cases eliminates, potential environmental ...
Compares methods used at CEGB (UK), EdF (France), and ENEL (Italy) for generation planning studies with particular reference to those tools (or parts of them) that perform a yearly simulation of the generating system operation. Offers a short description of the composition of the 3 generating systems for a better understanding of the different philosophies employed. Comments on the frequency of utilization of the programs and on their main differences. Suggests that since the 3 systems show a tendency towards a more similar mix in the future (e.g. the percentage of hydro power plants will decrease both in the French and in the Italian system while the nuclear and coal base units will increase; all 3 systems will include an increasing share of pumped storage plants) the discussed planning problems will probably become common to the 3 systems. Predicts increasing importance of coal transportation problems for ENEL and EdF organization; a more ...
The Zaafarana oilfield development, operated by Zaafarana Oil Co. (Zafco) presented a series of unique challenges, including redeployment of an internal-turret mooring system, use of a turret-based electrical-cable jumper system, and permanent use of cable-deployed electric submersible pumps in the gravel-pack well completions. Following a detailed three-dimensional (3D) seismic program, the field was discovered by the first well in December 1990. Four subsequent appraisal wells were drilled. The discovery well and two of the appraisal wells tested oil at rates ranging from 2,000 to 10,100 B/D. Initial development plans called for the use of two conventional platforms with a pipeline to a shore-based treatment and storage terminal. Data acquired from subsequent wells were incorporated into the mapping and reserve estimates resulting in a sharp downgrade of the estimated recoverable reserves. The reduced estimate, combined with a revised pricing scenario, ...
Eaton, in partnership with Oak Ridge National Laboratory and the Electric Power Research Institute (EPRI) has completed a project that applies a combination of wireless sensor network (WSN) technology, anticipatory theory, and a near-term value proposition based on diagnostics and process uptime to ensure the security and reliability of critical electrical power infrastructure. Representatives of several Eaton business units have been engaged to ensure a viable commercialization plan. Tennessee Valley Authority (TVA), American Electric Power (AEP), PEPCO, and Commonwealth Edison were recruited as partners to confirm and refine the requirements definition from the perspective of the utilities that actually operate the facilities to be protected. Those utilities have cooperated with on-site field tests as the project proceeds. Accomplishments of this project included: (1) the design, modeling, and simulation of the anticipatory wireless sensor network (A-WSN) that ...
Logistics modeling is a powerful analytical technique for effective planning of waste storage, treatment, and disposal activities. Logistics modeling facilitates analyses of alternate scenarios for future waste flows, facility schedules, and processing or handling capacities. These analyses provide an increased understanding of the specific needs for waste storage, treatment, and disposal while adequate time remains to plan accordingly. They also help to determine the sensitivity of these needs to various system parameters. This paper discusses a logistics modeling system developed by the Pacific Northwest Laboratory (PNL) to aid in solid waste planning for a large industrial complex managing many different types and classifications of waste. The basic needs for such a system are outlined, and the approach adopted in developing the system is described. A key component of this approach is the development of a conceptual ...
The power sector in Thailand is the largest contributor to CO{sub 2} emissions. There is high potential to mitigate CO{sub 2} emission via alternative power generating plants. Alternative plants considered in this study include nuclear plants, integrated gasification combined cycle plants, biomass-based plants and supercritical thermal power plants. The biomass-based plants considered here are fueled with four types of biomass; paddy husk, municipal solid waste (MSW), fuel wood and corncob. The methodology for the optimal expansion plan of the power generating system over the planning horizon is based on the least-cost approach. The results from the least-cost planning analyses show that the nuclear alternative has the highest potential to mitigate not only CO{sub 2} but also other airborne emissions. Moreover, the nuclear option is the most effective abatement strategy for CO{sub 2} reduction due to its negative ...
All of the project work since the previous report has been on Phase 2B tasks. Therefore, this quarterly progress report summarizes the period's activities in Engineering, Procurement and Civil Construction. Engineering is 95% complete, but revisions and changes are still being incorporated particularly in the Instrument and Electrical areas. Procurement has only valves 4 in. and above yet to order to complete all major items purchased. The scheduled material curve was based on the original estimate of the job. The projected curve reflects the previous month's estimate. Construction of civil work is proceeding according to schedule in the field. The initial bid packages for the Mechanical General Contractor portion of the work have been reviewed and evaluated. Order placement is scheduled for the end of July. The Electrical package is due back from the bidders on July 6. It requires additional evaluation by BSC and DSO and will not be placed until late August. The cost ...
The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy Field Office, Richland (RL) in 1987 as part of Pacific Northwest Laboratory. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with federal statutes and regulations. This report summarizes activities of the HCRL during fiscal year (FY) 1990. The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan (HCRMP) as a prioritized list of tasks. The task list guided cultural resources management activities during FY 1990 and is the outline for this report. In order, these tasks were to (1) conduct cultural resource reviews, (2) develop an archaeological resources protection plan, (3) monitor the condition of known archaeological sites, (4) plan a curation system for artifacts and records, (5) evaluate ...
US Department of Energy (DOE) Order 5400.1 requires the preparation of environmental monitoring plans and implementation of environmental monitoring programs for all DOE facilities. The order identifies two distinct components of environmental monitoring, namely effluent monitoring and environmental surveillance. In general, effluent monitoring has the objectives of characterizing contaminants and demonstrating compliance with applicable standards and permit requirements, whereas environmental surveillance has the broader objective of monitoring the effects of DOE activities on on- and off-site environmental and natural resources. The purpose of this document is to support the Environmental Monitoring Plan for the Oak Ridge Reservation (ORR) by describing the groundwater component of the environmental surveillance program for the DOE facilities on the ORR. The distinctions between groundwater effluent monitoring and groundwater surveillance ...
This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several ...
The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are ...
As a three-year joint university-industry effort, development of a generalized boiling transition analysis method has been started in 2002 aiming at enhanced capabilities of subchannel analysis for a wide variety of BWR-type fuel bundle geometry from ordinary BWR to tight lattice fuel bundles. For this purpose, five dominant factors affecting boiling transition phenomena have been identified on which our efforts of experimentation and numerical analyses are focused. In this report, as the first-year achievement, we will describe a master plan of the development and contents for experimental approaches to construct thermal-hydraulic databases. The databases will be utilized for the developments of constitutive equations to describe the basic characteristics of the elementary processes. The planned experiments are divided into two groups. One is air-water experiments at atmospheric pressure, and the other is steam-water experiments up to 1 MPa. ...
As a three-year joint university-industry effort, development of a generalized boiling transition analysis method has been started in 2002 aiming at enhanced capabilities of subchannel analysis for a wide variety of BWR-type fuel bundle geometry from ordinary BWR to tight lattice fuel bundles. For this purpose, five dominant factors affecting boiling transition phenomena have been identified on which our efforts of experimentation and numerical analyses are focused. In this report, as the first-year achievement, we will describe a master plan of the development and contents for experimental approaches to construct thermal-hydraulic databases. The databases will be utilized for the developments of constitutive equations to describe the basic characteristics of the elementary processes. The planned experiments are divided into two groups. One is air-water experiments at atmospheric pressure, and the other is steam-water experiments up to 1 MPa. ...
GAO's review of the H-Coal and Exxon projects showed inadequacies in DOE's contracting practices and a failure by DOE to properly plan, manage, and monitor, especially the H-Coal project. The initial Government-industry H-Coal agreements regarding the level of investment by private sponsors and the ceilings imposed on sharing in cost growth were imbalanced. Larger investments by private sponsors and sharing of cost growth provides an incentive to private sponsors to control costs and helps to assure that each party is fully committed to the success of the project. DOE started the H-Coal project prematurely before sufficiently detailed designs were available and without adequate project planning for functions such as construction scheduling, materials handling, inventory systems, and quality control. DOE staffing was inadequate at both projects to effectively monitor progress and contribute to timely decisions. Its contracts ...
The changes envisaged in the Management's draft plan will focus the resources of the Laboratory on the LHC project and its completion. One of CERN's largest areas of spending is in Industrial Service Contracts, which currently amount to nearly 15% of the CERN budget. At present more than 2000 people have access to CERN through such contracts, although the nature of the contracts means that expenditure is not only on labour but also on materials. The revised cost to completion of the LHC has caused understandable concern that savings in Industrial Services will give rise to job losses at CERN, and rumours of '500 lay-offs' appeared in some newspaper reports. These reports were based on misunderstanding and speculation rather than the actual plan being prepared at CERN. The current proposal regarding expenditure on Industrial Services - which is supported by the findings of Task Force 3 - is to redirect about CHF170 M to the LHC, spread over the ...
For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are ...
For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two ...
The idea to couple the Treatment Planning System (TPS) to the information on the real boron distribution in the patient is the main added value of the new methodology set-up at DIMNP of University of Pisa, in collaboration with the JRC of Petten (NL). The methodology has been implemented in the new TPS, called BDTPS (Boron Distribution Treatment Planning System), which takes into account the actual boron distribution in the patient brain, while the standard TPS assumes a uniform boron distribution, absolutely far from the reality. Nowadays, Positron Emission Tomography (PET) is able to provide this in vivo information. The new TPS, based on the Monte Carlo technique, has been validated comparing the main BNCT parameters (thermal flux, boron dose, etc.) as measured during the irradiation of a special heterogeneous boron phantom (HEBOM), ad hoc designed, as calculated by the BDTPS and by the standard TPS SERA. An evident SERA overestimation of ...
The increasing number of hazardous materials accidents in the United States has resulted in new federal regulations addressing the emergency response activities associated with chemical releases. A significant part of these new federal standards (29 CFR 1910.120 and 40 CFR Part 311) requires compliance with specific criteria by all personnel involved in a hazardous material emergency. This study investigated alternative lesson design models applicable to instruction for hazardous material emergencies. A specialized design checklist was created based on the work of Gagne, Briggs, and Wager (1988), Merrill (1987), and Clark (1989). This checklist was used in the development of lesson plan templates for the hazardous materials incident commander course. Qualitative data for establishing learning objectives was collected by conducting a needs assessment and a job analysis of the incident commander position. Incident commanders from 14 public and private organizations ...
Rectum reference dose points have a direct impact on the morbidity seen in gynecological intracavitaty radiotherapy. The aim of this study is to obtain less morbidity by marking rectum with radio opaque solution. Fourteen patients with gynecological cancer who underwent external radiotherapy received 15 Gray (Gy) intracavitary radiotherapy. During the internal radiotherapy planning, radio opaque solution has been administered into the rectum to observe it on lateral radiogram. Thus rectum reference dose point and five points were marked at sites nearest to the sources. Nucletron Planning system was used for obtaining three-dimensional planning. After therapy patients were followed at every three months. Median follow-up was 18 months. Most frequently observed morbidities were grade 1-2 rectitis and cystitis in six patients. As a result, more accurate rectum dose values and less factors causing dose changing can provide ...
Urban type R D (research and development) facilities have research institute functions which are not desirable to coexist in a city as compared with suburban R D facilities. Therefore careful consideration must be given to environmental protection. KSP is the first large scale urban type R D facility in Japan. The planning and construction have been made with the theme of realization of flexibility in architecture and mechanical planning as well as realization of environmental integrity. To achieve the target so-called technical slit is built at the center of the building to provide a void space for securing natural ventilation. It is effective for provision of internal mechanical spaces without spoiling urban View air exhaust from laboratories natural ventilation for underground parking lots and decrease of damage by strong wind on the ground level. Standards are established and organization is formed for environmental administration to ...
As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection ...
An important unresolved issue in outcomes analysis for lung complications is the effect of poor or completely lacking heterogeneity corrections in previously archived treatment plans. To estimate this effect, we developed a novel method based on Monte Carlo (MC) dose calculations which can be applied retrospectively to RTOG/AAPM-style archived treatment plans (ATP). We applied this method to 218 archived nonsmall cell lung cancer lung treatment plans that were originally calculated either without heterogeneity corrections or with primitive corrections. To retrospectively specify beam weights and wedges, beams were broken into Monte Carlo-generated beamlets, simulated using the VMC++ code, and mathematical optimization was used to match the archived water-based dose distributions. The derived beam weights (and any wedge effects) were then applied to Monte Carlo beamlets regenerated based on the patient computed tomography ...
This paper provides information on activities undertaken in a non- production oriented metal finishing operation to minimize waste and conserve resources. The facility is a 6000 sq foot shop that typically only deals with prototype parts. Utilizing a plan that includes employee awareness, common sense and existing technology, a noticeable reduction in waste volume has been obtained. Initiatives that are covered include: segregation of cyanide plating solutions, elimination of copper cyanide plating, elimination of hexavalent chromium plating, elimination of vapor degreasing, changing of rinsing practices, and changing a process for cleaning of aluminum parts. Some discussion is also presented on the effectiveness of combining the technologies of physical vapor deposition and electrodeposition to help minimize waste. Plans for additional initiatives including water recycling, elimination of cyanide plating and substitution of electrodeposition ...
WIPS (Whip and Impact of Piping Systems) is a special purpose computer code for the structural analysis of pipe whip dynamic effects following a postulated pipe rupture. WIPS has been developed primarily to provide support for the pipe whip analysis procedures described in Section 3.6.2 of the US Nuclear Regulatory Commission Standard Review Plan. This report summarizes the purpose and scope of the WIPS development effort, identifying those clauses in the Standard Review Plan which refer to pipe whip analysis, and indicating how the WIPS code can be used to provide supporting data. Detailed information on use of the code is contained in accompanying reports which cover: (1) user instructions; (2) theory; (3) programming procedures; and (4) verification examples.
This book examines the applications of Monte Carlo (MC) calculations in therapeutic nuclear medicine, from basic principles to computer implementations of software packages and their applications in radiation dosimetry and treatment planning. It is written for nuclear medicine physicists and physicians as well as radiation oncologists, and can serve as a supplementary text for medical imaging, radiation dosimetry and nuclear engineering graduate courses in science, medical and engineering faculties. With chapters is written by recognised authorities in that particular field, the book covers the entire range of MC applications in therapeutic medical and health physics, from its use in imaging prior to therapy to dose distribution modelling targeted radiotherapy. The contributions discuss the fundamental concepts of radiation dosimetry, radiobiological aspects of targeted radionuclide therapy and the various components and steps required for implementing a dose ...
The Tevatron is a proton anti-proton accelerator collider operating at the Fermi National Accelerator Laboratory. The machine is currently delivering beam for the CDF and D0 experiments, which expect increasing luminosity until the conclusion of Run II, planned for 2009. The Laboratory defined a plan for achieving higher luminosity, and one of the tasks is the upgrade of the accelerator's beam position monitor (BPM). The Tevatron was built during the early eighties and some of its control systems, including the BPMs, are still the original ones. This paper describes the front-end software of the Tevatron BPM upgrade, from the requirements to the implementation, and the underlying hardware setup. The front-end software designed is presented, emphasizing its modularity and reusability, allowing it to be applied to other Fermilab machines.
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.
Purpose - The purpose of this paper is to explore the functionality of multistage programming approach on network supply chain structure. Design/methodology/approach - The general supply chain structure is considered and the supply chain planning model is developed using a two stage programming approach. The same model is extended to cover the applicability and advantages of a multi-stage programming approach. Findings - A multi-period supply chain model for new product launches under uncertain demand for supply chain network structure has been developed. The model allows simultaneous determination of optimum procurement quantity, production quantity across the different plants, transportation routes and the outsourcing cost in case of shortages. The proposed multi-stage model is compared ...
When Congress passed the Emergency Planning and Community Right-to-Know Act of 1986 (EPCRA), it created a number of new reporting requirements for companies that handle toxic chemicals and products containing toxic chemicals. Section 313 of EPCRA requires that certain manufacturers report annual releases to the environment of listed toxic chemicals and chemical categories. Because these manufacturers must know the toxic chemical composition of the products they use to be able to calculate releases accurately, EPA requires some suppliers of mixtures or trade name products containing one or more of the listed section 313 toxic chemicals to notify their customers. The pamphlet explains which suppliers must notify their customers, who must be notified, what form the notice must take, and when it must be sent.
In the last few years the management of nuclear power plants as well as the supervising administration of the nuclear industry in Germany has focused more on emergency preparedness. The skills have been improved, but there are also improvements under way, yet. The study gives an overview about the status of emergency preparedness in German power plants, about the legal framework for emergency preparedness and about the elements of an effective emergency preparedness planning. However, it does not deal with technical accident management but with the organisational aspects of emergency planning. Also, the study gives a short outlook for future trends of development in the field of emergency preparedness in Germany. Major trends are the standardisation of organisational concepts, more training and more national and international feed back of know how on the topic. Yet, there is still some research work to be done, mainly to develop overall ...
During the normal operation of a Nuclear Power Plant (NPP), radioactive releases into the atmosphere will be in small quantities. During major accidental situations, though the probability is extremely small, there may be significant release of radioactivity to the environment through the stack or at ground level. To study the external radiation exposure, if any, to the members of public due to releases during the normal operation of a nuclear power plant (NPP) and also to meet the requirement of emergency preparedness for the NPP site, continuous recording and analysis of environmental dose rate data is essential. This paper presents analysis of the gamma dose rates recorded by the Environmental Dose Logging Systems (EDLS) installed around the site during the last six years in the Emergency Planning Zone (EPZ) of Tarapur Atomic Power Station (TAPS). (author)
Water chemistry of nuclear power plants has played an important role in reduction of personnel doses, structural materials and fuel integrity assurance, and reduction of radioactive wastes production. Further contributions are requested for advanced utilization of the LWR, advanced fuels and aging management of plants. Since water chemistry has an effect on all structure and materials immersed and at the same time affected by them, the optimum control not sticking to specific issues and covering the whole plant is required for these requests. Taking account of roles and activities of the industry, governmental institutes and academia, road maps on research and development plans for water chemistry were compiled into identified eleven items with targets and counter measures taken, such as common basic technologies, dose reduction, SCC mitigation, fuel cans corrosion/hydrogen absorption mitigation, condition based maintenance and flow accelerated corrosion ...
The ALICE experimental area management team faces various challenges when it comes to sharing scarce resources, indispensable to any efficient installation in a category one worksite. Space, cranes, jigs, and personnel with key competences have to be carefully allocated to activities so as to avoid slowing down work progress. To this intent, a resource loaded planning has been developed that allows highlighting coactivities and prioritizing critical tasks. It uses the built-in capabilities of Microsoft Project. The use of this scheduling tool leads to a more efficient use of time and a safer work environment. The installation sequence resulting from this schedule is presented in this paper. The first part of the sequence focuses on the revision of the coils in the SX2 building. The dipole has then to be installed in the RB26 side of the UX25 cavern. This complex and resource intensive activity has to be performed in parallel with the services installation inside ...
Wind power is a maturing technology that in a number of countries is likely to contribute a major share to fully renewable energy systems. Denmark has a comparably long history of wind power development and is planning to continue expanding the existing capacity. If a large-scale penetration of wind power is to be achieved, an integrated framework is needed that can respond to the associated challenges. This paper argues for adopting an integrated macro perspective when evaluating and building frameworks to support wind power development. This macro perspective is applied to the case of Denmark, and more specifically to concrete wind power projects in the region of Northern Jutland. The results suggest although certain elements in the legislation have been improved, the feasibility of wind power projects cannot be guaranteed, and there is a tendency to exclude smaller turbines from the development.
Following the 1986 Chernobyl accident there was an understandable increase in public interest in nuclear accidents and emergency planning for them. It became clear that the broad nature, timing and scale of the radiological hazard presented by such accidents was, however, little understood. This Paper sets out in simple terms the basic features of the radiological hazard to persons in the vicinity of a nuclear power plant should a serious accident occur. The Paper starts by stressing the difference between faults -events that may occur relatively frequently - and accidents -unplanned releases of radioactivity that are by design extremely unlikely events. The Paper examines the significance of different exposure pathways and relates them to the protective measures (countermeasures) that may be taken. These countermeasures include sheltering, evacuation and the consumption of stable iodine tablets. The Paper illustrates the effectiveness of these countermeasures, ...
Proper use of quality assurance will provide the basis for an effective management control system for nuclear waste management programs. Control is essential for achieving successful programs free from costly losses and failures and for assuring the public and regulators that the environment and health and safety are being protected. The essence of quality assurance is the conscientious use of planned and systematic actions, based on selecting and applying appropriate requirements from an established quality assurance standard. Developing a quality assurance program consists of using knowledge of the technical and managerial aspects of a project to identify and evaluate risks of loss and failure and then to select appropriate quality assurance requirements that will minimize the risks. Those requirements are integrated into the project planning documents and are carried out as specific actions during the life of the project.
A compilation of technical papers, from the 23rd annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting, is presented. Papers were given in the following categories: (1) developments in rubidium, cesium, and hydrogen-based frequency standards, and in cryogenic and trapped-ion technology; (2) international and transnational applications of PTTI technology with emphasis on satellite laser tracking networks, GLONASS timing, comparison of national time scales and international communications; (3) applications of PTTI technology to the telecommunications, power distribution, platform positioning, and geophysical survey industries; (4) applications of PTTI technology to evolving military communications and navigation systems; and (5) dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, Loran, and synchronous communications satellites.
The basic relationships of the convolution/superposition dose calculation technique are reviewed, and a modelling technique that can be used for obtaining a satisfactory beam model for a commercially available convolution/superposition-based treatment planning system is described. A fluence energy spectrum for a Co-60 treatment machine obtained from a Monte Carlo simulation was used for modelling the fluence spectrum for a Rokus M machine. In order to achieve this model we measured the depth dose distribution and the dose profiles with a Wellhofer dosimetry system. The primary fluence was iteratively modelled by comparing the computed depth dose curves and beam profiles with the depth dose curves and crossbeam profiles measured in a water phantom. The objective of beam modelling is to build a model of the primary fluence that the patient is exposed to, which can then be used for the calculation of the dose deposited in the patient. (authors)
A programme to optimize the short-term operation planning of hydrothermal system scheduling is presented. Based on heuristics, an operational planning of pumped storage plants and a method for fast evaluations of spot market deals under consideration of load forecast errors was developed. (orig.) [German] Vorgestellt wird ein Programm, das - basierend auf Heuristiken - den kurzfristigen Einsatz eines hydrothermischen Kraftwerksparks optimiert. Im Programm wurde dazu ein Verfahren zur Pumpseichereinsatzplanung und zur sekundenschnellen Bewertung von Spot-Markt-Geschaeften unter Beruecksichtigung von Lastprognosefehlern entwickelt. (orig.)
The objective of this study was to provide a framework for land use and resource allocation decisions in the Northeast Coal Block of British Columbia. The area was divided into a number of sites, and information gathered in two main areas, 1) status of the resource base, and 2) resource management/planning/development. A map and physical description of each site is provided as well as such information as - air quality, soils, vegetation, water resources, petroleum and natural gas resources, coal resources, and gravel resources, agricultural resources, timber resources, fisheries and wildlife resources, recreatational and aesthetic (visual) resources. The appendix volume provides a summary of the institutional management framework and approval procedures for all significant resource sectors. Provincial legislation and government acts are identified.
The three tasks were completed during this reporting period. During this quarter, work focused on a local structural analysis of the Table Rock field, greater Green River basin (GGRB) in southwestern Wyoming. The ultimate objective of the local analysis is to apply the techniques developed and demonstrated during earlier phases of the project in the Rulison Field area of the Piceance basin for sweet-spot delineation. The primary goal of this work is to focus in on the Table Rock field area in the northern Washakie basin of the Greater Green River basin in support of Union Pacific Resources and DOE planned horizontal drilling efforts. The work plan for the quarter of April 1, 1998--June 30, 1998 consisted of three tasks: (1) Acquire necessary seismic data and depth-convert, (2) Map major fault geometry and analyze displacement vectors, (3) Develop and initiate a natural fracture prediction study.
Summary Status epilepticus or other brain-damaging insults launch a cascade of events that may lead to the development of epilepsy. MRI techniques available today, including T2- and T1-weighted imaging, functional MRI, manganese enhanced MRI (MEMRI), arterial spin labeling (ASL), diffusion tensor imaging (DTI), and phase imaging, can detect not only damage caused by status epilepticus but also plastic changes in the brain that occur in response to damage. Optimal balance between damage and recovery processes is a key for planning possible treatments, and noninvasive imaging has the potential to greatly facilitate this process and to make personalized treatment plans possible.
During the last few decades, accuracy in photon and electron radiotherapy has increased substantially. This is partly due to enhanced linear accelerator technology, providing more flexibility in field definition (e.g. the usage of computer-controlled dynamic multileaf collimators), which led to intensity modulated radiotherapy (IMRT). Important improvements have also been made in the treatment planning process, more specifically in the dose calculations. Originally, dose calculations relied heavily on analytic, semi-analytic and empirical algorithms. The more accurate convolution/superposition codes use pre-calculated Monte Carlo dose "kernels" partly accounting for tissue density heterogeneities. It is generally recognized that the Monte Carlo method is able to increase accuracy even furt...
This brochure describes the strategy employed by the administration of Malaspina University--College in Nanaimo, British Columbia, to implement energy-efficient plans and integrating systems and plans that would allow the institution to consume less energy, fewer resources and improve the health and well-being of its students and staff. An assessment study to identify the most problematic areas, and to develop a prioritizing strategy for their replacement was the first step, followed by rigorous adherence to a 10- year cyclical replacement schedule. The program includes replacement of rooftop ventilation units, installation of high-performance glazing units to replace single-glazed windows, implementation of an Energy Management System to monitor heating, ventilating and air conditioning systems, and a Power Smart New Building Design and Building Improvements Program. The combined cost avoidance associated with these projects is estimated to ...
We present two cases of fetal neck masses that were initially diagnosed by ultrasound and further evaluated with prenatal MRI. MRI findings aided in further delineating the neck masses, increasing confidence in the final diagnosis (cervical teratoma and cystic hygroma). With the fetal airway typically filled with fluid that is of high signal on T2-weighted sequences, MRI images in three planes could identify whether the fetal larynx and trachea were partially or completely compressed by the neck tumor. This information was particularly useful in determining if a controlled delivery such as ex utero intrapartum treatment (EXIT) was necessary and aided the surgeons in planning their approach to establishing airway control in the delivery room. (orig.)
This paper summarizes the IHY and BSS activities in West Asia and their importance in many Arab countries, such as Algeria, Egypt, Iraq, Jordan, Kuwait, Qatar, Saudi Arabia, UAE, etc. BSS future plans for some of these countries are as follows: It is proposed by the astronomers from the Arabian Gulf Region to build the Gulf Observatory on top of Jabal Shams (2980 msl) which will have a 2-3 m optical telescope. Libya signed a contract with a French company for building an observatory which will have a 2-m optical robotic telescope. It is also proposed to rebuild the Iraqi National Astronomical Observatory (INAO) which was destroyed during the two wars. It is planned to build a 5-6 m optical telescope and a small solar telescope on the top of Korek mountain, which has excellent observing conditions.
Global supply chain practices and their effects have received considerable attention over the last two decades. In the recent past, the need for integration across supply chains has been identified as a key for effective and efficient operations of supply chains. This is observed with the increasing trend of collaborative partnerships among supply chain partners. This paper presents an integrated approach for manufacturing and distribution networks within the supply chain system of a global car company. The paper shows that the integration of manufacturing and distribution networks creates the environment for effective planning of many components and execution/follow-up of those plans. These components include materials, resources, operations/activities, suppliers and customers. The main f...
Medical Science Liaison (MSL) teams are a well-recognized function within the pharmaceutical and medical products industries. While in most organizations, MSLs have focused on the development of relationships with individual Key Opinion Leaders, progressive companies have realized the value that MSLs can also bring to Key Account Management (KAM). This article discusses the five steps that should be followed in order to successfully integrate the support of Key Accounts into an MSL function. These include understanding the business approach to KAM, identifying what MSL resources are available, developing a comprehensive strategic plan, implementing the plan, and evaluating and making any necessary adjustments. Finally, a case example outlining the experience of a small pharmaceutical compa...
An unprecedented mobilization at all levels is being established in order to fight against the effects of climate change and announcements are increasing each week with proposals of ever more ambitious plans of action. A new landscape is beginning to take shape from a more varied energy supply with less carbon. This new order highlights several central R/D areas which are to be developed and which re described in the first part of this article. How are these plans of action going to be put into practice in the field, within the dynamics of the great unifying project 'Grenoble University of Innovation'? How can the innovation process be speeded up to quickly find answers to all these questions? How can all scientific disciplines be incorporated in this run-up and how can the different players be brought to interact? The new PREDIS centre in Grenoble, described in the second part of the article, is intended to answer these questions. (authors)
Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This ...
This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.
Purpose - The purpose of this paper is to explain some tax management complications for onshore and offshore hedge funds posed by US FIN 48, Uncertain Tax Positions, and to emphasize the hedge fund manager's responsibility for careful tax planning and compliance. Design/methodology/approach - The paper discusses a hedge fund's objective to deliver tax-efficient results to investors, explains the background of FIN 48, and illustrates five types of situations in which conservative auditors following FIN 48 may raise "red flags." Findings - With the advent of FIN 48's standards careful tax planning and compliance are more important than ever for a hedge fund. Significant complications may arise from unwise, tardy, or missed tax elections; filing an IRS Form 8275, Disclosure Statement, stating...
The non-proliferation experiment, originally called the chemical kiloton experiment, was planned and executed by Lawrence Livermore National Laboratory to investigate the seismic yield relationship and distinguishing seismic signals between a nuclear event and a large mass conventional explosion. The Los Alamos National Laboratory planned and conducted experiments to further their studies of the source function for signals observed seismically. Since all investigations were contingent on the performance of the emplaced chemical explosive, an array of diagnostic measurements was fielded in the emplaced explosive. The CORRTEX system was used to investigate the explosive initiation and to determine the detonation velocities in multiple levels and in numerous directions. A description of the CORRTEX experiments fielded, a review of the data obtained and some interpretations of the data are reported.
In 1980 through 1982 a Basewide Energy Systems Plan (BESP) was developed under the direction of the Corps of Engineers at Ft. McClellan to assist the installation in meeting the requirements of the Army Facilities Energy Plan and the ten (10) year Energy Use Reduction Goal. Some of the energy saving projects recommended by the BESP have been implemented. In FY 1977, the total base energy consumption was 1,105,221 MBtu (Million British thermal units). By FY 1987, this had been reduced to 870,900 MBtu, a reduction of twenty-one percent (21%). This resulted in a cost avoidance for FY 1987 over base year FY 1977 of $2,960,986, or a thirty-two percent (32%) reduction.
This case study is an application, to a nuclear power plant, of the methodology for quantifying environmental costs and benefits, contained in the regional energy plan, adopted in April, 1983, by the Northwest Power Planning Council, pursuant to Public Law 96-501.The study is based on plant number 2 of the Washington Public Power Supply System (WNP-2), currently nearing completion on the Hanford Nuclear Reservation in eastern Washington State. This report describes and documents efforts to quantify and estimate monetary values for the following seven areas of environmental effects: radiation/health effects, socioeconomic/infrastructure effects, consumptive use of water, psychological/health effects (fear/stress), waste management, nuclear power plant accidents, and decommissioning costs. 103 references.
The Network for a Healthy California (Network) employs a Geographic Information System (GIS) to identify the target audience and plan program activities because GIS is a powerful tool for assisting in data integration and planning. This paper describes common uses of GIS by Network contractors as well as demonstrating the possibilities of GIS as a useful tool for public health programs and audience targeting in general. Narrative examples supported with graphics describe how 1) Network contractors use the GIS to identify eligible census tracts to carry out their work, 2) the GIS can map neighborhood assets in eligible census tracts throughout California, 3) the GIS can map health behavior data to the county level throughout California, and 4) the GIS can map selected indicators of healthy ...
A negative public reaction is expected to oppose plans of the British energy industry to take valuable sites for industrial and commercial projects on the ground that government demand forecasts are too high and that they downplay conservation. The United Kingdom (UK) Department of Energy points out that public inquiry always accompanies energy installations and defends the projections made by producers even though each study emphasizes the demand for its own form of energy. At issue are plans to open 150 opencast coal mines a year to compensate for diminishing oil and gas supplies, onshore drilling by oil and gas exploration teams on nearly 50,000 km/sup 2/, and sites required for onshore pipelines, synthetic natural gas facilities, pumped storage plants, and nuclear power stations and waste management. The sites under discussion raise aesthetic and ecological concerns. (DCK)
A number of buildings dating from the 1950s and 1960s were retrofitted with thermal insulation in order to cut energy consumption. This took place within the building competition 'Therma' nitrated by the Federal Ministry of Regional Planning, Building and Town Planning in 1974. Result at that time were so encouraging that now, 15 years later the results were checked again with special attention to the long-term performance of the thermal insulation measures. Laboratory tests prove that the building materials are still in good condition and that humidity has not increased with age. Cracks in the surface plaster of the compound insulation systems occurred at different frequencies and intensities and usually caused by thermal tensions. (BWI).
Japan's basic nuclear policy is to reprocess spent fuel and to effectively use the recovered plutonium and uranium. MOX fuel utilization in LWRs is promoted in 16-18 reactors by FY2015. Commercial operation of Rokkasho Reprocessing Plant is planned to start in 2012. Prototype reactor 'Monju' restarted operation in May 2010. From FY 2007, Fast Reactor Cycle Technology Development Project (FaCT project) started which focuses more toward the commercialization stage FBR cycle. Basic scenario of Japan's R and D aims for realization of demonstration FBR by around 2025 and introducing commercial FBRs before 2050. Smooth transition from LWR fuel cycle to FBR one is an important point. For nuclear fuel cycle which requires long term R and D, human resources development and keeping is vitally important. (author)
This manual is intended to provide a free resource on essential network security concepts for non-technical managers of small libraries. Managers of other small nonprofit or community organizations will also benefit from it. An introduction defines network security; outlines three goals of network security; discusses why a library should be concerned with network security; and describes limits of this work. The manual is divided into three main parts. Part One features the management issues related to network security: analyzing risk, developing a security plan and policy, the funding requirements libraries can expect in operating their networks, and implementing adequate security. Part Two describes the areas of computer networks that need to be secured, and provides a description of many of the security measures necessary for adequate security. Part Three presents sample documents that may be help in the library's efforts to secure its network A glossary and ...
British Columbia Hydro's new corporate strategic plan now recognizes two special responsibilities: to the province's native peoples and to the people of the Columbia River Basin. Eight strategic initiatives in the categories of obligations, investments, and opportunities are outlined. Four initiatives are aimed at meeting moral obligations: to pursue employment equity, to establish mutually beneficial business relationships with native peoples, to develop and maintain a leadership role in environmental stewardship, and to ensure a fair annual return on investment to the province. Two initiatives will see investments of strategic importance to British Columbia's future in the areas of job creation and economic progress throughout the province, notably in the Columbia River Basin. The final two initiatives concern development of export markets for the utility's technical services and expertise, and synergy with other Crown agencies ...
The number of spent fuel storage facilities in the world continues to increase because of "Wait and See" policies and delay of a permanent disposal plan. The temporary spent fuel storage concept is changing to a pre-disposal storage concept. Strengthened safety concepts are required for expanded spent fuel storage facilities and sites. The Korea Hydro and Nuclear Power Company is planning to construct a reinforced concrete MACSTOR-400 facility at Wolsung. In concrete dry spent fuel storage structures, cracks can occur due to radiant heat and environmental chloride. The likelihood of cracking increases over time. Research on changes in shielding performance from one collinear crack in the surface of a concrete facility has been carried out. However there is no research about public radiolog...
The United States Air Forces air mobility command is responsible for creating a schedule and executing that schedule for a large-scale air mobility network that encompasses aircraft with prioritized missions. Aerial ports (airports) can process or park a maximum number of aircraft, called the maximum on ground (MOG). As the schedule changes due to disruptions, such as equipment failure or weather, the MOG constraint can cause the new schedule to be infeasible. Traditionally, re-planning the channel route schedule to adhere to MOG constraints has been a manual process that usually stops after the first feasible set of changes is found, due to the challenges of large amounts of data and urgency for a re-plan. We extend Bertsimas and Stocks integer program formulation for the commercial airli...
Three geothermal direct heat applications were examined to derive a set of cost estimates from which one could determine the effect of changes in system parameters (temperature, flow, load, etc.) on the cost of heat. For each application, a set of resource characteristics and system inputs were chosen to best represent a site specific baseline condition. The baseline estimated cost of heat was calculated along with other cost estimates representing optimistic and pessimistic conditions, bracketing the range any input variable might reasonably take. Regression equations based upon these cost estimates were developed for each application to quantitatively relate changes in cost to changes in the input variables. These three equations and their accompanying nomographs serve as easily understandable planning tools for direct heat geothermal energy projects.
Various theories and examples of modelling, forecasting and optimization designing in the different parts of the petroleum and gas industries are presented, stochastic programming for long term planning in the refining industry, stochastic model for gasoline blending, feedstock optimization, location and sizing for offshore platforms, hydrocarbon exploration simulation rapid method, valuation of oil field development leases, economic models for petroleum allocation, models for oil supply market, trade embargo game theory, stochastic programming of gas contract portfolio management, scheduling transportation of oil and gas, strategic planning in an oil pipeline company, simulation of offshore oil terminal systems, hierarchical selection of oil and gas distribution systems.
The purpose of this study was to compare 2 adaptive radiotherapy strategies with helical tomotherapy. A patient having mesothelioma with mediastinal nodes was treated using helical tomotherapy with pretreatment megavoltage CT (MVCT) imaging. Gross tumor volumes (GTVs) were outlined on every MVCT study. Two alternatives for adapting the treatment were investigated: (1) keeping the prescribed dose to the targets while reducing the dose to the OARs and (2) escalating the target dose while maintaining the original level of healthy tissue sparing. Intensity modulated radiotherapy (step-and-shoot IMRT) and 3D conformal radiotherapy (3DCRT) plans for the patient were generated and compared. The primary lesion and nodal mass regressed by 16.2% and 32.5%, respectively. Adapted GTVs and reduced plan...
It is necessary to identify those measurable soil parameters which dictate the severity of the corrosion problem for coated irons and steels. When this is done, meaningful accelerated aging tests can be designed to validate the reduced corrosion rate for the planned coating. The following discussion introduces the important concepts and measurement parameters in the (a) design of accelerated aging tests, and (b) evaluation of the planned installation site for corrosion potential. Certain combinations of soil oxidation reduction potential (ORP) or electric potential (Eh), acidity (pH), fertilizer, water table, and soil hydraulic conductivity can result in severe corrosion of buried steel/iron vessels. If there are power lines nearby, additional loss of vessel material to the soil will occur. These factors are discussed.
Greening is a useful mitigation strategy for planners mainly from a visual perspective. For high-density urban living environment such as Hong Kong, urban greening helps cooling the air and providing shade; it also helps lowering building energy consumption by providing a better outdoor boundary condition. Many researchers have also suggested that greening may be employed as a strategy for combating the ill effects of urban Heat Island (UHI). Working towards a set of better greening guidelines for urban planners, the current paper first provides a comprehensive review of planning with urban greening. It then describes parametric studies that have been conducted to investigate the preferred location, amount, and types of vegetation for urban planning. The parametric studies employed the num...
Progress made during the first phase effort of the Solar-Thermal Full-System Experiment is summarized. This is one of a number of projects in the Solar-Thermal Subprogram involved with the development of solar central receiver hardware and systems for future use by utilities. The main emphasis is on systems that use Brayton-Cycle (gas turbine) equipment. The project summarized involves the planning and design of a complete Brayton-Cycle solar central receiver experimental system that would include all components of a commercial-size electric utility solar power plant. The objective of the overall project is to demonstrate the technical feasibility of a complete Brayton-Cycle, solar-fossil hybrid central receiver system. Major objectives of the Phase I effort summarized are to plan and design the experiment in detail and to organize a utility Test and Operating Group that would be directly involved in the development and operation of the ...
A Zinc/Air Battery Review and Strategic Planning Meeting was held in 1993. One outcome of the meeting was recognition of the need for a report on the current status of the technology. This report contains contributions from many of the attendees at the above meeting and expresses their views on where the technology is today and what could/should be done to improve its performance.
Weakly penetrating radiation monitoring and investigating with area monitors and individual dosimeters were carried out at Daya Bay nuclear power plant during its refueling outages. This paper introduces monitoring methods, measuring results, data analysis and assessment, presents some suggestions for monitoring plan and protection measures in the future as well. (authors)
The report shows that in Europe mountain regions, coastal zones, wetlands and the Mediterranean region are particularly vulnerable to climate change. Although there could be some positive effects, many impacts are likely to be adverse. Existing adaptive measures are concentrated in flood defence, so there is considerable scope for adaptation planning and implementation in other areas, such as public health, water resources and management of ecosystems. (au)
The Danish Ministry of Transportation has prepared a national plan of transportation, for the years until 2005. Official policy concerning land, maritime and air transport, personal and cargo transportation, investments and expenditures is outlined. Environmental impacts of energy consumption and air pollution abatement measures are considered. (EG)
The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affected by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the ...
Various diagnostics techniques for condition monitoring and life prediction of fluid power components and system are discussed. Though some of the techniques are very promising but may not be accepted because of increase in the instrumentation, it is planned to implement these techniques on various circuits of Fluid Power Lab for further improving and developing these for direct implementation in various fluid power circuits of power reactors. (author). 6 figs.
An overall systems approach has been applied to develop action plans to support the retrieval and immobilization waste disposal mission. The review concluded that the systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. The review showed that since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farm structure and configurations and work scope and costs has been established itself as part of the culture within TWRS. An analysis of the programmatic, management and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, people and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and immobilized waste disposal ...
The current status and future plans of the Ok Ridge Spallation Neutron Source (ORSNS) are reviewed. The ORSNS is a new project initiated by the U.S. Department of Energy (DOE) beginning October 1, 1995, to prepare the conceptual for a new spallation neutron source. (author) 2 refs.
In this note we describe a conceptual design of a part ofthe electron beam delivery system for FERMI@Elettra free electron laser(FEL) located between the end of the linac and the entrance to the FEL.This part includes the emittance diagnostic section, the electron beamswitchyard for two FELs called spreader and matching sections. The designmeets various constrains imposed by the existing and planned buildingboundaries, desire for utilization of existing equipment and demands forvarious diagnostic instruments.
Energy policy is discussed, with particular reference to Scotland. The plans for nuclear power are analyzed in comparison with developments in coal mining, use of oil and gas and other possible energy sources such as wind and wave power. Arguments against the development of nuclear power are raised on grounds of economics, employment potential, and problems of waste disposal. (U.K.).
A detailed definitive cost estimate is given for an ethanol/gasohol storage and blending terminal serving a planned distillery at a Louisiana sugar factory. Included are an analysis of the accuracy of the estimate, labor rates efficiency, materials and labor escalation, as well as detailed calculations for each account of the project. (LEW)
This volume contains appendices D6 through D8 containing laboratory test data: from MK-F investigation, 1987, Old Rifle and New Rifle sites; on bentonite amended radon barrier material; and from MK-F investigation, 1987, riprap tests.
Brachytherapy consists of sealed radioactive source implantation. The diversity in the nature of radioelements, in their energy and activity requires strict implantation and utilization rules. These rules include radioactive source physical parameters check, after-loading machine and treatment planning system quality assurance and safe and reproducible dosimetric systems. Patient and medical workers information guarantee radioprotection and prevention of accidental exposures. (authors)
A reliable inventory control system was developed at the Fast Flux Test Facility (FFTF) to keep track of the occupancy of 900 refueling facility locations, to compile historical data on the movement of each reactor assembly, and to simulate assembly moves. The simulate capability is valuable because it allows verification of documents before they are issued for use in the plant, and eliminates the possibility of planning illegal or impossible moves. The system is installed on a UNIVAC 1100 computer and is maintained using a data base management system by Sperry Univac called MAPPER.
An indoor survey in order to estimate the population exposure in five towns of an Italian Region is presented. A particular methodology for the campaign was planned and is being applied. Gamma spectrometry of building materials, exposure rate measurements indoors and outdoors and radon concentration measurements indoors were taken with different techniques. A correlation was found between mean gamma exposure rate and mean radon concentration in the houses investigated. An evaluation of mean effective dose equivalents for the inhabitants of the five towns is reported.
The purpose of the work reported in this paper was to measure the radionuclide buildup in primary heat transport system cell No. 3 at the Fast Flux Test Facility (FFTF) and to compare the results with predicted values from a model based on experimental studies and experience at similar reactors. The information obtained is used for maintenance planning and to enhance ability to assess radionuclide buildup in the future at FFTF and in other reactors.
The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise ...
The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project.
Purpose: The purpose of this course is to review the physical principles underlying design, clinical application and execution of interstitial and intracavitary implants in the classical low dose-rate (LDR) range. This year, the course will focus on quality assurance of sources, applicators and treatment planning software. In addition, development of procedures and QA checks designed optimize treatment delivery accuracy and patient safety during each individual procedure will be reviewed. The level of presentation will be designed to accommodate both physicists and physicians. Implementation of recently published AAPM Task Group reports (no. 40, 'Comprehensive Quality Assurance' and No. 43, 'Dosimetry of Interstitial Brachytherapy Sources') will be reviewed. Outline: (A) General Principles (1) QA endpoints: temporal accuracy, positional accuracy, dose delivery accuracy, and safety of the patient, personnel, and the institution (2) QA procedure development: forms, ...
This is an inquiry-based module created specifically for use with the PhET simulation Geometric Optics. It includes a lesson plan for teaching about convex lenses, step-by-step student directions, and a set of Power Point "clicker" questions for use as warm-up questions or informal assessment. This resource is part of a larger collection of interactive Java simulations for students of physics, developed by the Physics Education Technology project at the University of Colorado.
This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has ...
This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 ...
Purpose: This study presents a dosimetric optimization effort aiming to compare intensity-modulated (IM) X-rays and IM protons in 4 different orbital and paraorbital tumors. These are most challenging targets for standard radiotherapy due to their close relationship with the eyes and related structures. Methods and Materials: A primary orbital lymphoma, an optic nerve meningioma, a sphenoidal ridge meningioma protruding into the orbit, and a pediatric parameningeal paraorbital rhabdomyosarcoma were selected for the purpose of this study. Planning target volumes (PTVs) and organs at risk (OAR) were defined in each patient CT data set for each tumor site. IM X-ray and IM proton three-dimensional treatment plans were implemented. The following total tumor doses were prescribed: 30 Gy for the orbital lymphoma, 54 Gy for both meningiomas, and 50.4 Gy for the rhabdomyosarcoma case. Dose-volume histograms (DVHs) were obtained for all targets and OAR ...
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development of future radiological safety plans by presenting detailed discussion of the problems and solutions arising during Operation Castle.
This report is designed to cover the overall Operation Castle radiological safety matters from the viewpoint of those issues of direct concern to Headquarters, Joint Task Force Seven. It was written for the express purpose of assisting in the development of future radiological safety plans by presenting detailed discussion of the problems and solutions arising during Operation Castle. Included is a discussion of fallout forecasting techniques.
This paper describes the conversion from an existing production control computer, an SEL 840, to a DEC VAX 11/780. The plan is to add a layer of hardware to accomplish a smooth and gradual transition from the 840 to the VAX while leaving the underlying equipment unchanged. The architecture of the control system software is discussed for a large linear accelerator from the standpoint of its requirements and the particular design philosophy chosen.
Several new reactor neutrino experiments are being considered to measure the parameter theta-13. The current plans for Angra, Braidwood, Daya Bay, KASKA and KR2DET are reviewed. A case is made that, together with Double-CHOOZ, a future world program should include at least three such experiments.
...Project objectives to restore/create network of secure lapwing breeding sites to provide conservation management advice to planners, developers and land managers to raise awareness of lapwing conservation issues in the local areaKey dates so far First pair of lapwing breeding at Parc Bryn Bach, mitigation site for loss of a nearby large lapwing breeding colony, in May 2008Work planned or underway Continued working with developers and landowners to ...
This study provides information on energy resource development and the efforts of State and local communities in the Rocky Mountain, Appalachian, and coastal regions to deal with the related social and economic impacts. It also provides information on the range of options and resources generally available to States and local communities from local, State, industry, and Federal sources to plan for and mitigate the adverse effects of energy development. Onsite visits and interviews with State, local, and Federal officials and private industry involved in mitigating socioeconomic impacts were made.
Nov 16, 2010 ... In situ observations are usually made point-wise and the problem in using ...... also discussion of adaptive filtering in Section 4.1.2 of the L4_SM ...... L2-SR -265 SMAP shall provide a Level 1C radar sigma-0 product ...
This document describes the proposed strategy for disposal of spent and failed melters from the tank waste treatment plant to be built by the Office of River Protection at the Hanford site in Washington. It describes program management activities, disposal and transportation systems, leachate management, permitting, and safety authorization basis approvals needed to execute the strategy.
As the Operating and Support staffs of the FFTF organization have gained experience, the plant reliability and capacity factors have shown a steadily improving trend. The plant capacity factor for Cycle 4 was 99.5%. It is the purpose of this report to describe the evolution of the maintenance organization at the FFTF site from a general support organization to a technically proficient organization playing a major role in planning and performance of plant maintenance evolutions.
Primary Ewing's sarcoma of the skull is a very rare entity. We report MRI findings in a case of Ewing's sarcoma of the greater wing of sphenoid in a 4-year-old patient. Magnetic resonance imaging showed markedly heterogenous signal intensity with areas of haemorrhage and necrosis. It also demonstrated the exact extent of tumour due to its multiplanar capabilities and was, therefore, helpful in planning surgery. Copyright (2002) Blackwell Science Pty Ltd
Revisions at steam turbines should present a problem-free procedure due to the long use of these machines. Changes in the market result in difficulties during the inspection work. The shortage of qualified personnel and manufacturing capacities are the cause for these difficulties. Important procedures of revisions are described in detail in the VGB regulations. Direct contacts between the customers and the suppliers facilitate the expirations substantially. In the case of good planning and under consideration of the well-known regulations, a revision can be accomplished to the satisfaction of customers and suppliers.
The bibliography contains citations concerning Federal and state laws and management programs for the protection and use of inland wetlands. Utilization of wetlands to control highway runoff and community wastewater is discussed. Wetlands protection programs, restoration projects, resource planning, and wetlands identification methods are cited. References to coastal and salt water wetlands are not included in this bibliography. (Contains 250 citations and includes a subject term index and title list.)
Beagle dogs given a single inhalation exposure to "2"3"9Pu(NO_3)_4 are being observed for life-span dose-effect relationships. Over half of the dogs planned for "2"3"9Pu(NO_3)_4 exposure have been exposed and the remaining dogs will be exposed as they reach adult age.
This statement summarizes Lawrence Livermore National Laboratory`s committment to making important scientific, technological, and business contributions to global sustainability. The quest has many aspects, some socio-political or economic and some technological, and some in which the soft and hard sciences become indistinguishable, as in visionary national strategies, like Holland`s, and futuristic regional and city development plans, like those of Kagoshima and Chattanooga.
This report summarizes the activities and major accomplishments for the Idaho National Laboratory Advanced Radiotherapy Research Program for calendar year 2004. Topics covered include boron analysis in biological samples, computational dosimetry and treatment planning software development, medical neutron source development and characterization, and collaborative dosimetry studies at the RA-1 facility in Buenos Aires, Argentina.
This report summarizes the activities and major accomplishments for the Idaho National Engineering and Environmental Laboratory (INEEL) Advanced Radiotherapy Research Program for calendar year 2002. Topics covered include computational dosimetry and treatment planning software development, medical neutron source development and characterization, and boron analytical chemistry.
This report summarizes the activities and major accomplishments for the Idaho National Engineering and Environmental Laboratory (INEEL) Advanced Radiotherapy Research Program for calendar year 2002. Topics covered include computational dosimetry and treatment planning software development, medical neutron source development and characterization, and boron analytical chemistry.
The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.
This paper describes a Honshu-Shikoku linking transmission cable building plan and its technical features. The Chugoku District and the Shikoku District are supplied with power currently by the Chugoku-Shikoku trunk line of 220,000 volts. To cope with the anticipated power shortage, a plan was established to install power cables for 500,000 volts on the Honshu-Shikoku connecting bridge. The plan calls far an installation length of 127.4 km and a transmission capacity of 1.2 million kW per line. The cable installation on the Seto Bridge was completed already, the construction is now in the peak period for building steel towers on the land sections, and laying overhead cables and underground cables. Commencement of the operation is scheduled 1994 on one liner, and 2000 on two lines. The technical features include the Japan's first large-capacity, long-distance underground transmission cable installation, and the ...
The High-Level Waste Storage Tank Farms/242-A Evaporator Standards/Requirements Document (S/RID) is contained in multiple volumes. This document (Volume 2) presents the standards and requirements for the following sections: Quality Assurance, Training and Qualification, Emergency Planning and Preparedness, and Construction.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Report for the subject facility, represents the results of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. It contains; compliance status, remedial actions, and an implementing manuals report linking S/RID elements to requirement source to implementing manual and section.
The proceedings contain 21 papers arranged under the following topical sections: Exploration technology (4 papers); Reservoir technology (5 papers); Energy conversion technology (8 papers); Drilling technology (2 papers); and Direct use and geothermal heat pump technology (2 papers). An additional section contains a report on a workshop on dual-use technologies for hydrothermal and advanced geothermal reservoirs.
In this article, the author presents the main technological solutions, available or in development, on X-ray detectors in order to obtain a digital image in biomedical radiography or in industrial radiography: linear x-ray detectors and bidimensional x-ray detectors (memory radioluminescent screens, matrix plan detectors).
A supplementary report to the plan for waste disposal in the Copenhagen area, Denmark. It presents a mapping of wastes and waste flow in invidual areas, a description of recycling methods and waste collection systems. In addition legislative demands and potentials are dealth with. (CLS).
Due to the fast cooling of steam turbines, the shutdown time during maintenance or when repairing faults and damage can be shortened. This booklet describes various processes for cooling steam turbines. It is recommended that fast cooling should be planned in designing new plants and corresponding arrangements should be provided in the form of pipe connections and valves. (DG).
The philosophy of work management in radiation protection puts emphasis on the following up and management of overall process from work selection, planning, preparation, implementation till experience feedback, and overall optimization of production and safety management. This paper reports practices and experiences of Daya Bay nuclear power plant in the implementation of the philosophy during operational radiation protection through the practical examples
Load-deflection characteristics of alumina and alumino-silicate fibrous blankets were experimentally determined. Load retention and springback capability of combinations of these materials were measured in a 10,000-hour test at surface temperatures of 650 to 1000"0C (1200 to 1832"0F). Experimental results are presented and future testing plans are discussed.
The advent of sophisticated automation equipment and computer hardware and software is changing the way manufacturing is carried out. To compete in the global marketplace, manufacturing companies must integrate these new technologies into their factories. In addition, they must integrate the planning, control, and data management methodologies needed to make effective use of these technologies. This paper provides an overview of recent approaches to achieving this enterprise integration. It then describes, using simulation as a particular example, a new tool`s perspective of enterprise integration.
Whooper swans habitat in the coastal regions of Denmark can be affected by wind turbine arrays on the coast. The planned array consists of 55 wind turbines very close to the swan breeding area. A possibility of moving the swans away from the windmill area would be to spread the preferred swan feeds (rape, potatoes) outside their present breeding ground. (EG) 14 refs.
BackgroundEffectiveness of services for patients diagnosed with severe mental illness (SMI) may improve when treatment plans are needs based. A regional Cumulative Needs for Care...Full Text Available
This paper describes the research and development activities in three areas of radiation processing, namely: food irradiation, medical product sterilization and wood plastic combination. Plans and efforts exerted to acquire a larger gamma source to augment our present 5,000 curie source are discussed. Cost estimates for a radiation facility are presented on the basis of the market potential of food irradiation and medical product sterilization. Existing local industries that can benefit from the adaptation of irradiation technology in their processing requirements are described.
imaging of the solar corona began in 1960 via a primitive pinhole camera on a ... IR wavelengths. Such data help us to study in detail the pre-eruptive ...... Schematic picture of flare loops, CME, and the current sheet between ..... As part of NASA's Living With a Star (LWS) program the planned Sentinel mission ...
A community greenhouse gas emission and energy inventory is an important tool to help local governments plan, implement and monitor climate change mitigation strategies and sustainable energy systems. Inventories can also facilitate a number of other local priorities such as air quality management; integrated land-use and transportation planning; infrastructure optimization and planning; and community economic development planning. The British Columbia government's community energy and emissions inventory initiative (CEEI) intends to collect and centralize high-quality geocoded data to generate high-value community inventories for the province's 185 local governments. This report presented strategic guidance for a comprehensive community emissions inventory system based on a high level review of international best practices. The report described the project objective and scope; guiding principles; ...
This report describes outer continental shelf oil and gas activities in the Atlantic Region. This edition of the Atlantic Update includes an overview of the Mid-Atlantic Planning Area and a summary of the Manteo Prospect off-shore North Carolina. 6 figs., 8 tabs.
The paper will report the experience gained in the implementation of the national assistance projects, including the detailed assessment of the national situation compared to the ITWG Model Action Plan, the upgrading of the technical skills, the training of national experts and the joint analysis of nuclear material at ITU. The status of the work with the 13 future Member States to the European Union will also be reported on during the conference
The development of emmissions, the measures planned and carried out and the present state of research in the Federal Republic of Germany into air pollution effects and abatement technology is reported. Possible starting points and solutions for air pollution abatement measures are explored within the legal framework.
The Project was started August 1, 1992. During these first two months, the Project Management plan was issued and approved during discussions at the Pittsburgh Energy and Technology Centre. Feed materials for the experimental work (with the exception of the second solvent) have been received. The analytical work up of these feed materials has been completed, and autoclave stability tests with the solvent and solvent fraction have been performed and analyzed. The Project is proceeding on schedule.
The Project was started August 1, 1992. During these first two months, the Project Management plan was issued and approved during discussions at the Pittsburgh Energy and Technology Centre. Feed materials for the experimental work (with the exception of the second solvent) have been received. The analytical work up of these feed materials has been completed, and autoclave stability tests with the solvent and solvent fraction have been performed and analyzed. The Project is proceeding on schedule.
This document is an addendum to the 1996 Gunnison Monitoring Report for the Gunnison, Colorado, Wetlands Mitigation Report, dated July 1997. The purpose of this addendum is to: (1) modify how information on plant height and plant species criteria are presented; and (2) provide more detailed information regarding the evaluation of the bare ground criteria at the Camp Ketle site. The information in this addendum is provided at the request of the Bureau of Land Management to aid in future monitoring and evaluation of the wetland mitigation sites.
The purpose is to provide a source of information that can be used to assist personnel in the planning, training, and execution of radiological work using the principles of ALARA. This document is not intended to replace HNF or WHC Control Manual requirements. The ALARA Tools-List provides detailed information on the use and procurement of engineered controls, mockup training guidelines, and good radiological work practices that have been proven to be ALARA.
In co-operation with the Scientific Planning Department of the Central Research Institute for Vessel- and Turbine Building the construction office of the turbine factory Charkow finished the draft of a slowly running (n = 1500 min"-"1) 2 GW-turboset for the operation of nuclear power plants. The chief purpose of the project was to determine the technical problems that are used to occur during the development of such steam turbines, as well as to settle the most favourable design. (orig./GL).