WorldWideScience

Sample records for building construction industry

  1. IT-investigation in the building construction industry

    DEFF Research Database (Denmark)

    Sørensen, Lars Schiøtt

    1995-01-01

    An investigation of the level of computing in the Danish construction industry. A quantitative and qualitative level was stated among architects, engineers, building owners, contractors a.o. use of computing......An investigation of the level of computing in the Danish construction industry. A quantitative and qualitative level was stated among architects, engineers, building owners, contractors a.o. use of computing...

  2. Environmental and Energy Aspects of Construction Industry and Green Buildings

    Science.gov (United States)

    Kauskale, L.; Geipele, I.; Zeltins, N.; Lecis, I.

    2017-04-01

    Green building is an important component of sustainable real estate market development, and one of the reasons is that the construction industry consumes a high amount of resources. Energy consumption of construction industry results in greenhouse gas emissions, so green buildings, energy systems, building technologies and other aspects play an important role in sustainable development of real estate market, construction and environmental development. The aim of the research is to analyse environmental aspects of sustainable real estate market development, focusing on importance of green buildings at the industry level and related energy aspects. Literature review, historical, statistical data analysis and logical access methods have been used in the research. The conducted research resulted in high environmental rationale and importance of environment-friendly buildings, and there are many green building benefits during the building life cycle. Future research direction is environmental information process and its models.

  3. Industrial robots application in the construction of buildings and structures

    Directory of Open Access Journals (Sweden)

    Verzhbovskiy Gennady

    2017-01-01

    Full Text Available Proposals on the use of modernized industrial robots in the construction of low-rise buildings are formulated. The necessary parameters of such a mechanism are established. The time necessary for building the walls of a two-story house is determined. Features of the robots use on the construction site are described.

  4. Work Stress among Professionals in Building Construction Industry in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2011-09-01

    Full Text Available This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria.

  5. Work Stress among Professionals in Building Construction Industry in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2011-09-01

    Full Text Available This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria. 

  6. Sustainable Construction Industry Development and Green Buildings: A Case of Latvia

    Science.gov (United States)

    Kauskale, L.; Geipele, I.; Zeltins, N.; Vanags, J.

    2018-02-01

    Nowadays, more and more attention is being paid to the country's economy, construction industry and real estate market's sustainable development and to the studies related to these issues. The aim of the research is to analyse significant aspects of sustainable development of construction activities and real estate market, with particular focus on environmental aspects of construction or the role of green buildings. The research includes an integrated approach of construction industry analysis and analysis of real estate operations area. Scientific and practical solutions and recommendations will enable the industry participants to be introduced to the main sustainable aspects of construction industry development, which, in their turn, can improve the overall performance of the industry in the long term.

  7. Sustainable Construction Industry Development and Green Buildings: A Case of Latvia

    Directory of Open Access Journals (Sweden)

    Kauskale L.

    2018-02-01

    Full Text Available Nowadays, more and more attention is being paid to the country's economy, construction industry and real estate market's sustainable development and to the studies related to these issues. The aim of the research is to analyse significant aspects of sustainable development of construction activities and real estate market, with particular focus on environmental aspects of construction or the role of green buildings. The research includes an integrated approach of construction industry analysis and analysis of real estate operations area. Scientific and practical solutions and recommendations will enable the industry participants to be introduced to the main sustainable aspects of construction industry development, which, in their turn, can improve the overall performance of the industry in the long term.

  8. Apprenticeship Bullying in the Building and Construction Industry

    Science.gov (United States)

    Riggall, Michaela; Skues, Jason; Wise, Lisa

    2017-01-01

    Purpose: The purpose of this paper is to explore the definition, prevalence, antecedents, consequences and coping behaviours associated with apprenticeship bullying in the building and construction industry. Design/methodology/approach: The sample comprises 13 participants aged between 22 and 27 (M = 23.8, SD = 1.26) who were all men who had…

  9. Prefabrication in Building Construction: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2014-07-01

    Full Text Available Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight method as a MCDM approach. The results depict that main advantages of prefabrication are ?Shorter construction time? and ?Less construction site waste?. The top hindrances in adopting prefabrication as identified in this study are: ?Higher initial construction cost? and ?Inflexible for design changes?. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan

  10. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  11. Implementation of building information modeling in Malaysian construction industry

    Science.gov (United States)

    Memon, Aftab Hameed; Rahman, Ismail Abdul; Harman, Nur Melly Edora

    2014-10-01

    This study has assessed the implementation level of Building Information Modeling (BIM) in the construction industry of Malaysia. It also investigated several computer software packages facilitating BIM and challenges affecting its implementation. Data collection for this study was carried out using questionnaire survey among the construction practitioners. 95 completed forms of questionnaire received against 150 distributed questionnaire sets from consultant, contractor and client organizations were analyzed statistically. Analysis findings indicated that the level of implementation of BIM in the construction industry of Malaysia is very low. Average index method employed to assess the effectiveness of various software packages of BIM highlighted that Bentley construction, AutoCAD and ArchiCAD are three most popular and effective software packages. Major challenges to BIM implementation are it requires enhanced collaboration, add work to a designer, interoperability and needs enhanced collaboration. For improving the level of implementing BIM in Malaysian industry, it is recommended that a flexible training program of BIM for all practitioners must be created.

  12. Push an pull forces in the building and construction industry

    NARCIS (Netherlands)

    Frings-Dresen, M. H. W.; Windhorst, Judith; Hoozemans, M. J M; Van Der Beek, Allard J.; Van der Molen, Henk F.

    2000-01-01

    Push and pull activities are increasing in the building and construction industry. These activities can be assumed as one of the risk factors for the development of low back and upper extremity complaints. For a risk evaluation, besides the frequency and the duration of the activities, information

  13. Handbook of energy use for building construction

    Energy Technology Data Exchange (ETDEWEB)

    Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  14. Handbook of energy use for building construction

    Science.gov (United States)

    Stein, R. G.; Stein, C.; Buckley, M.; Green, M.

    1980-03-01

    The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, railroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. Emphasis is given to new building construction; however, some information for the other parts of the construction industry is also included. Building designers are provided with information to determine the energy required for buildings construction and to evaluate the energy required for alternative materials, assemblies, and methods. It is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

  15. Sustainable Industrialization in the Building Industry: On the Road to Energy Efficient Construction Management

    DEFF Research Database (Denmark)

    Wandahl, Søren; Ussing, Lene Faber

    2013-01-01

    Since the Brundtland report in 1987, sustainability has been an issue in all parts of the world, and the focus is increasing in these years. In the same period, the building industry has in the same period also been under heavy pressure to increase productivity in the same pace as other manufactu......Since the Brundtland report in 1987, sustainability has been an issue in all parts of the world, and the focus is increasing in these years. In the same period, the building industry has in the same period also been under heavy pressure to increase productivity in the same pace as other...... manufacturing industries. An important question, then, is how well these two highly relevant areas can go hand in hand. By means of comparing the main ideas and drivers behind sustainability and industrialization, respectively, common threads, possible synergies and evident barriers are put forward...... in this discussion paper. The main method is a review to track past merits in the two domains and to detect knowledge gaps that have research potential. A strategic research agenda focusing on energy-efficient construction management is outlined showing the need for future focus on combining industrialization...

  16. Investigation on factors that contribute to the abandonment of building in construction industry in Malaysia

    Science.gov (United States)

    Farhayu Ariffin, Nur; Jaafar, Mohd Faizal Md; Idris Ali, Mohamad; Irwan Ramli, Noram; Muthusamy, Khairunisa; Shukor Lim, Nor Hasanah Abdul

    2018-03-01

    In Malaysia, the construction sector is one of the important sectors that contribute to economic growth and employments. However, a major concern facing the construction industry is the growing rate of delays in project delivery. In the worse cases, the projects were abandoned due to some reasons when the contract period ended. Abandoned building defines as construction work that has been continuously stalled for 6 months or more, during the project completion period or beyond the scheduled date of completion. When the projects become abandoned, it gives an adverse effect on many parties such as the developer, contractor, consultant and also client. According to previous researchers, the abandonment of building causes a serious problem and need some mitigation plan to avoid this problem from occurring. This study will investigate the fundamental factors that contribute to the abandonment of building and projects in Malaysia based on the current data of the abandoned building in most states in Malaysia. The data was collected from the respondents who is in the construction industry and had experience working with abandoned housing project. Form the respondents perspective, it shows that the main factor contribute to the building abandonment is due to the financial problem facing by the developer company.

  17. New technologies in Islamic countries. Power engineering, transport, oil industry, machinery construction, building construction and information technologies problems

    International Nuclear Information System (INIS)

    Sharipova, N.S.

    1999-01-01

    The published proceedings contain brief presentations concerning new technologies in power engineering, transport, oil industry, machinery construction, building construction and information technologies presented to the International scientific and technical conference: New technologies in Islamic countries, which was organized within frame work of 6 General Assembly of Federation of engineering Institutes of Islamic countries (FEIIC). (author)

  18. New technologies in Islamic countries. Power engineering, transport, oil industry, machinery construction, building construction and information technologies problems

    International Nuclear Information System (INIS)

    Sharipova, N.S.

    1999-01-01

    This issue contains papers, which reflect the most important achievements of new technologies in power engineering, transport, oil industry, machinery construction, building construction and information technologies presented to the International Scientific and Technical Conference: New technologies in Islamic countries, which was organized within frame work of 6 General Assembly of Federation of Engineering Institutes of Islamic Countries (FEIIC). (author)

  19. How energy efficiency fails in the building industry

    International Nuclear Information System (INIS)

    Ryghaug, Marianne; Sorensen, Knut H.

    2009-01-01

    This paper examines how energy efficiency fails in the building industry based on many years of research into the integration of energy efficiency in the construction of buildings and sustainable architecture in Norway. It argues that energy-efficient construction has been seriously restrained by three interrelated problems: (1) deficiencies in public policy to stimulate energy efficiency, (2) limited governmental efforts to regulate the building industry, and (3) a conservative building industry. The paper concludes that innovation and implementation of new, energy-efficient technologies in the building industry requires new policies, better regulations and reformed practices in the industry itself

  20. 2nd International Conference on Construction and Building Research

    CERN Document Server

    Fernández-Plazaola, Igor; Hidalgo-Delgado, Francisco; Martínez-Valenzuela, María; Medina-Ramón, Francisco; Oliver-Faubel, Inmaculada; Rodríguez-Abad, Isabel; Salandin, Andrea; Sánchez-Grandia, Rafael; Tort-Ausina, Isabel; Construction and Building Research

    2014-01-01

    Many areas of knowledge converge in the building industry and therefore research in this field necessarily involves an interdisciplinary approach. Effective research requires strong relations between a broad variety of scientific and technological domains and more conventional construction or craft processes, while also considering advanced management processes, where all the main actors permanently interact. This publication takes an interdisciplinary approach grouping various studies on the building industry chosen from among the works presented for the 2nd International Conference on Construction and Building Research. The papers examine aspects of materials and building systems; construction technology; energy and sustainability; construction management; heritage, refurbishment and conservation. The information contained within these pages may be of interest to researchers and practitioners in construction and building activities from the academic sphere, as well as public and private sectors.

  1. Building “with the Systems” vs. Building “in the System” of IMS Open Technology of Prefabricated Construction: Challenges for New “Infill” Industry for Massive Housing Retrofitting

    Directory of Open Access Journals (Sweden)

    Jelena Nikolic

    2018-05-01

    Full Text Available Post-war industrialized housing between 1955 and 1985 in Belgrade and its special form of integrated prefabrication has been analyzed with a strong interest in transformation capacity of industrialized building model (IBM on different technical levels. Research field is massive housing up to 23 floors, 400 dwellings per building and different housing layouts—to be evaluated for potential retrofitting at the dwelling level. IBM for massive housing built with IMS construction technology represents an integration of systems’ components into hierarchy assemblies by simple joints. IMS Building Technology by IMS Institute is the system for high-rise structures with prefabricated elements of the skeleton. In order to assess the current situation regarding the selection and implementation of energy savings measures and the role of industrialized technology in supporting the rehabilitation of post-war housing in Belgrade—building configuration model and IMS construction technology has been analyzed, providing in-depth information on the way building components and systems are put together into IBM. In which way retrofit may be approached? IBM is represented with graph model (GM diagram to describe a number of value-added processes according to independent systems/components and flexible connections. This paper highlights the technological aspects of “open” prefabrication industry and building with the systems that should be assessed in the future retrofitting of massive housing based on industrialization and energy efficiency. The paper proposes an IBM that provides concrete description of massive housing buildings, the requirements for information to be provided to approving refurbishment processes. The research also addresses both: challenges as well as opportunities for advancing Building Information Modeling (BIM standards in off-site re-construction of massive housing with new “infill” industry.

  2. Potential and Benefits of Building Information Modeling (BIM During Pre-Construction, Construction and Post Construction Stage

    Directory of Open Access Journals (Sweden)

    Aw Nien Wei

    2017-11-01

    Full Text Available The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology currently used in the construction industry is the AutoCAD (Automatic computeraided design. AutoCAD is a commercial software application for 2D and 3D computer-aided design (CAD and drafting develop by Autodesk. Generally, all the drawing design from Autocad will be exchanged among the stakeholder in the form of paper. Information exchanged among them mostly involves a lot of documents and drawings. This practice creates errors because of documents and drawings are mostly in a paper-based format that is not properly managed which results in miscommunication among them. Having wrong information in the construction process could hinder the productivity of projects because in a construction project information is one of the important construction materials. Building Information Modeling (BIM is one of the newly software in the architecture, engineering, and construction (AEC industries to ensure all parties receive the right information. BIM technology is also an intelligent model of a building constructed digitally in the way of 3D. The software will generate model containing the information needed to support the construction, fabrication, and procurement activities that needed to realize the building. This paper will discuss on potential and benefits of BIM during pre-construction stage, construction stage and during post construction stage

  3. A review on the current issues and barriers of Industrialised Building System (IBS) adoption in Malaysia’s construction industry

    Science.gov (United States)

    Amin, M. A. Mohd; Abas, N. H.; Shahidan, S.; Rahmat, M. H.; Suhaini, N. A.; Nagapan, S.; Rahim, R. Abdul

    2017-11-01

    Malaysia considers the construction industry as one of the main contributors to its Gross Domestic Product (GDP). However, there are some unresolved issues arising from the ongoing and widespread adoption of the conventional method of construction such as the resultant fragmentation of the industry itself; delays in production and delivery time of unnecessary wastages and lack of sustainability practice. Malaysian Government has been continuously encouraging the industry to use, partly or if not wholly, the Industrialized Building System (IBS), which is considered to be an important part of sustainable construction initiative. IBS was introduced to Malaysia as the solution to issues related to dependencies of foreign workers, raising demand for affordable accommodations and improving image, quality and productivity of construction industry. However, the IBS adoption in Malaysia remains low. This paper presents the review of the current issues and barriers of IBS adoption in Malaysian construction industry.

  4. Analysis of Latest Experience in Design of Industrial Buildings Reconstruction by Constructing Additional Interfloor Overlaps

    Science.gov (United States)

    Peshnina, I.; Sinitsina, O.

    2017-11-01

    The study relevance is determined by the increasing interest in reconstruction of city historical centers and located in the area of industrial buildings the functional profile of which needs to be changed. The problem of obtaining extra usable spaces in the historical centers of cities is solved by raising the number of storeys in the buildings which can be achieved by the construction of additional built-in inter-floor overlaps. The article is dedicated to the analysis of the recent years’ experience in reconstruction design involving this method in our country and abroad, in the Netherlands, in particular. The article presents the results of the analysis of the experience in reconstruction of the objects by constructing additional inter-floor overlaps and aims to define the optimum construction solution for built-in inter-floor overlapping and to develop non-existing solutions for wide application of this method in the reconstruction of a building with non-unified and unmodulated parameters. It was determined as expedient to apply a monolith reinforced concrete slab with the use of steel profiled flooring as a formwork and reinforcement and steel beams designed as “Built-in Beams” for the construction of built-in inter-floor overlaps in reconstruction. The article will be useful for specialists doing research in the sphere of reconstruction of the buildings and for the practical activity of design engineers.

  5. The Adoption of Ergonomic Innovations for Injury Prevention : Examples from the building construction and health care industries

    OpenAIRE

    Glimskär, Bo

    2014-01-01

    A good work environment is important for the individual, for industry and for society. The work environment research has, predominantly, targeted identification of problems and the measurement of the size of these problems. Innovations to reduce the incidence of musculoskeletal disorder, MSD, have been introduced in different branches of industry, but with limited success. Few of the ergonomic innovations developed for the building and construction industry have reached a sufficient level of ...

  6. Impact of climate and weather on the activities of the building and construction industry in South Africa

    CSIR Research Space (South Africa)

    De Villiers, GDT

    1986-01-01

    Full Text Available This study represents a quantitative survey of the impact of the climate and weather on the activities of the building and construction industry in South Africa. Seasonal productivity problems, the seasonal provision of special facilities...

  7. SPECIFICITY IN DEVELOPMENT OF CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    O. S. Golubova

    2012-01-01

    Full Text Available Specificity in development of construction industry of the Republic of Belarus determines  character of competition on the construction market, forms a pricing, marketing and product policy of building companies. Construction represents itself as a highly developed complex where interaction of business entities is of rather complicated multilateral character.

  8. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  9. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  10. Innovation, Procurement and Construction Industry Development

    Directory of Open Access Journals (Sweden)

    Geard de Valence

    2010-12-01

    Full Text Available The implications for analysis of innovation in construction of theoretical developments in industrial organisation are considered in this research, as an attempt to outline a new approach to construction innovation incorporating the ideas found in knowledge based, technology centred models. The paper firstly summarises characteristics of the construction industry, focusing on their effects on innovation, before surveying some of the ideas about the sources of innovation and the expansion and application of knowledge. Construction can be seen as an industry with limited scope for knowledge externalities, where the procurement methods used by the industry’s clients do not pay for innovation. The following discussion uses recent developments in the research on the economics of innovation and industrial organization theory, such as research intensity and the endogenous sunk costs in competitive, fragmented, low research intensity industries. The effects on R&D of procurement methods and on industry structure are discussed, with a focus on the appropriability of innovations and the role of the client on the Heathrow Terminal 5 project. The paper concludes that the procurement methods used for building and construction projects appears to be a determining factor in the level of innovation in the construction industry

  11. Modeling injury rates as a function of industrialized versus on-site construction techniques.

    Science.gov (United States)

    Rubio-Romero, J C; Suárez-Cebador, M; Abad, Jesús

    2014-05-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed that the industrialized steel modular system presents the lowest accident rate, while the highest accident rate was recorded in the construction method with cast-in-place concrete. The lightweight construction system also presents a high accident rate. Accordingly, industrialized building systems cannot claim to be safer than traditional ones. The different types of "on-site work" seem to be the main variable which would explain the accident rates recorded in industrialized construction systems. Copyright © 2014 Elsevier Ltd. All rights reserved.

  12. A system approach to the environmental analysis of industrial buildings

    Energy Technology Data Exchange (ETDEWEB)

    San-Jose Lombera, Jose-Tomas [LABEIN-Tecnalia, C/Geldo, Parque Tecnologico de Bizkaia, Edificio 700, 48160 Derio (Vizcaya) (Spain); Department of Science of Materials, ESTSI Bilbao-University of Basque Country (UPV/EHU), Alda, Urquijo s/n, 48013 Bilbao (Spain); Garrucho Aprea, Isaac [SEDICAL S.A., Txorierri Etorbidea 46 - Pab, 12 F 48150 Sondica (Vizcaya) (Spain)

    2010-03-15

    The construction sector plays a major role in the development of society. It wields enormous influence over economic activity, employment and growth rates. However, it also has a substantial impact on the natural environment, the effects of which are evident across the world. Over recent decades, pioneering initiatives have proposed environmentally friendly buildings and sustainable construction has centred on residential and office buildings. Nevertheless, further consideration still needs to be given to sustainability in many areas of industrial construction. Accordingly, an Integrated Value Model for Sustainable Assessment (MIVES) is presented in this article that applies a set of six study scopes to define the sustainability criteria of industrial buildings. The system uses a requirements tree to quantify sustainability at various hierarchical levels, in order to assess the behaviour of industrial buildings and compliance with the criteria. Assignment of value functions to the sustainability criteria is then described in the context of a case study of a printing works, which demonstrates the effectiveness of this model at unifying both qualitative and quantitative indicators, in order to arrive at a specific ''environmental sustainability index'' for the industrial building. (author)

  13. Causes of defects in the South African housing construction industry ...

    African Journals Online (AJOL)

    Martyn le Roux, Department of Quantity Surveying, P.O. Box 77000, Nelson Mandela ... in South Africa. There is a shortage of skilled people in the South. African construction industry; local and international companies within the construction industry are joining ..... observation of construction of any new home or building.

  14. Urban BIPV in the new residential construction industry

    Energy Technology Data Exchange (ETDEWEB)

    Elzinga, D.

    2008-03-15

    This report for the International Energy Agency (IEA) made by Task 10 of the Photovoltaic Power Systems (PVPS) programme takes a look at urban building-integrated photovoltaics (BIPV) in the new residential construction industry. The mission of the Photovoltaic Power Systems Programme is to enhance the international collaboration efforts which accelerate the development and deployment of photovoltaic solar energy. The aim of Task 10 is stated as being to enhance the opportunities for wide-scale, solution-oriented application of photovoltaics in the urban environment. The report states that different types of building require different approaches to BIPV due to their associated varying dimensions and geometry. Several solutions are proposed to encourage the adoption and diffusion of BIPV by the new home residential building industry. These are divided into PV industry-based approaches and policy-based solutions. The former include end-customer focused policies, the identification of early adopters, the creation of product solutions that meet the needs of the building industry and standards and that the construction industry must be engaged in the design and planning stage of residential developments. Policy questions discussed include the provision of incentives, a planned approach to the demonstration of BIPV and the development of BIPV-specific policy.

  15. BARRIERS AND CHALLENGES OF BUILDING INFORMATION MODELLING IMPLEMENTATION IN JORDANIAN CONSTRUCTION INDUSTRY

    OpenAIRE

    Mohammed A.KA. AL-Btoush*, Ahmad Tarmizi Haron

    2017-01-01

    Construction companies are faced with the need to innovatively integrate the construction process and address project development challenges. One way of doing that is the integration of building information modelling (BIM) in the building design and development cycles. However, due to the lack of clear understanding and the absence of a holistic implementation guideline, many companies are unable to fully achieve BIM potentials or implement BIM in their project and building lifecycle. BIM imp...

  16. Transformation of Malaysian Construction Industry with Building Information Modelling (BIM

    Directory of Open Access Journals (Sweden)

    Latiffi Aryani Ahmad

    2016-01-01

    Full Text Available Building Information Modelling (BIM is a revolution of technology and a process that transformed the way building is planned, designed, analysed, constructed and managed. The revolution of technology and process could increase the quality of construction projects. The knowledge of BIM has been expanding in many countries including Malaysia. Since its inception, the use of BIM has broadened up widely with different purposes. The aims of this paper is to investigate the BIM implementation and uses in Malaysian construction projects. The methodologies adopted for structuring this paper are by using literature review and semi-structured interview with construction players that have experienced and being involved in projects using BIM. The purpose of literature review is to illustrate on the pervious research on the subject matter. Meanwhile, the purpose of interviews is to explore the involvement of construction players, years of experience in projects using BIM and BIM uses in construction projects. The findings revealed that BIM has been implemented in Malaysia since 2007 by various construction players, which are client, architect, C&S engineer, M&E engineer, QS, contractor, facilities manager and BIM consultant. The findings also revealed that BIM is used for project’ visualisation, improving project design, detecting design clashes, quantity take off and operation and maintenance. Further work will be focused on the current practices of construction players in projects using BIM.

  17. Safety concerns related to modular/prefabricated building construction.

    Science.gov (United States)

    Fard, Maryam Mirhadi; Terouhid, Seyyed Amin; Kibert, Charles J; Hakim, Hamed

    2017-03-01

    The US construction industry annually experiences a relatively high rate of fatalities and injuries; therefore, improving safety practices should be considered a top priority for this industry. Modular/prefabricated building construction is a construction strategy that involves manufacturing of the whole building or some of its components off-site. This research focuses on the safety performance of the modular/prefabricated building construction sector during both manufacturing and on-site processes. This safety evaluation can serve as the starting point for improving the safety performance of this sector. Research was conducted based on Occupational Safety and Health Administration investigated accidents. The study found 125 accidents related to modular/prefabricated building construction. The details of each accident were closely examined to identify the types of injury and underlying causes. Out of 125 accidents, there were 48 fatalities (38.4%), 63 hospitalized injuries (50.4%), and 14 non-hospitalized injuries (11.2%). It was found that, the most common type of injury in modular/prefabricated construction was 'fracture', and the most common cause of accidents was 'fall'. The most frequent cause of cause (underlying and root cause) was 'unstable structure'. In this research, the accidents were also examined in terms of corresponding location, occupation, equipment as well as activities during which the accidents occurred. For improving safety records of the modular/prefabricated construction sector, this study recommends that future research be conducted on stabilizing structures during their lifting, storing, and permanent installation, securing fall protection systems during on-site assembly of components while working from heights, and developing training programmes and standards focused on modular/prefabricated construction.

  18. Innovative Development of Building Materials Industry of the Region Based on the Cluster Approach

    Directory of Open Access Journals (Sweden)

    Mottaeva Asiiat

    2016-01-01

    Full Text Available The article discusses issues of innovative development of building materials industry of the region based on the cluster approach. Determined the significance of regional cluster development of the industry of construction materials as the effective implementation of the innovative breakthrough of the region as an important part of strategies for strengthening innovation activities may be to support the formation and development of cluster structures. Analyses the current situation with innovation in the building materials industry of the region based on the cluster approach. In the course of the study revealed a direct correlation between involvement in innovative activities on a cluster basis, and the level of development of industry of construction materials. The conducted research allowed identifying the factors that determine the innovation process, systematization and classification which determine the sustainable functioning of the building materials industry in the period of active innovation. The proposed grouping of innovations for the construction industry taking into account industry-specific characteristics that reflect modern trends of scientific and technological progress in construction. Significance of the study lies in the fact that the proposals and practical recommendations can be used in the formation mechanism of innovative development of building materials industry and the overall regional construction complex of Russian regions by creating clusters of construction.

  19. Reverse logistics in the construction industry.

    Science.gov (United States)

    Hosseini, M Reza; Rameezdeen, Raufdeen; Chileshe, Nicholas; Lehmann, Steffen

    2015-06-01

    Reverse logistics in construction refers to the movement of products and materials from salvaged buildings to a new construction site. While there is a plethora of studies looking at various aspects of the reverse logistics chain, there is no systematic review of literature on this important subject as applied to the construction industry. Therefore, the objective of this study is to integrate the fragmented body of knowledge on reverse logistics in construction, with the aim of promoting the concept among industry stakeholders and the wider construction community. Through a qualitative meta-analysis, the study synthesises the findings of previous studies and presents some actions needed by industry stakeholders to promote this concept within the real-life context. First, the trend of research and terminology related with reverse logistics is introduced. Second, it unearths the main advantages and barriers of reverse logistics in construction while providing some suggestions to harness the advantages and mitigate these barriers. Finally, it provides a future research direction based on the review. © The Author(s) 2015.

  20. Potential and Benefits of Building Information Modeling (BIM) During Pre-Construction, Construction and Post Construction Stage

    OpenAIRE

    Aw Nien Wei; Md Azree Othuman Mydin

    2017-01-01

    The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology current...

  1. Introduction of Building Information Modeling (BIM) Technologies in Construction

    Science.gov (United States)

    Milyutina, M. A.

    2018-05-01

    The issues of introduction of building information modeling (BIM) in construction industry are considered in this work. The advantages of this approach and perspectives of the transition to new design technologies, construction process management, and operation in the near future are stated. The importance of development of pilot projects that should identify the ways and means of verification of the regulatory and technical base, as well as economic indicators in the transition to Building Information Technologies in the construction, is noted.

  2. Applications of building information model (BIM) in Malaysian construction industry

    Science.gov (United States)

    Tahir, M. M.; Haron, N. A.; Alias, A. H.; Al-Jumaa, A. T.; Muhammad, I. B.; Harun, A. N.

    2017-12-01

    Since the introduction of BIM in Malaysia in 2009, the technology adoption rate is slow when compared to other countries of the world. Most of the construction companies in Malaysia have an insight on the BIM concept but are yet to implement it in the management of their construction projects. By the year 2020, the Malaysian government will make BIM mandatory, this makes it important to carry out research on the possible applications of the technology. A qualitative method of enquiry was used for this study in Klang Valley using semistructured interview. The responses received were analysed using Principal component analysis (PCA). The result of the analysis showed that “quantity take-off and estimation”, “clash detection and coordination”, “integration and collaboration of stakeholders”, and “design and visualisation” as the main applications of BIM in Malaysia presently. The implication of this findings is that the Malaysian construction industry productivity is likely to increase to meet the demand of the population through the implementations of BIM. More also, BIM technology is regarded as the future of construction industry, which makes it very important for the industry.

  3. Industrial Disputes in the Construction Sector

    Directory of Open Access Journals (Sweden)

    L.J Perry

    2012-11-01

    Full Text Available The Cole Royal Commission enquiry into the building and construction (abbreviated to ‘construction’ sector recommended controversial workplace-relation reforms for that sector. The recommended changes are likely to be enshrined in legislation within the year. The Commission drew on analyses of industrial disputes that focused, in the main, on quite recent experience. This paper attempts to give a broader historical perspective on disputes in that sector by considering the pattern of disputes for the entire post-World War II period. Accordingly, data on disputes and employees during the entire period are gathered from Australian Bureau of Statistics current and archived sources. These data are classified according to sector (construction versus non-construction and analysed. It is found that the strike rate has, on average, been greater in the construction sector than in the non-construction sector. However, there have been periods during which disputes in the construction sector have been relatively low. The most recent period was during the period of the Accord (1983-96, during which the strike rate in the construction sector fell relatively strongly. The analysis of this relatively broad historical period draws attention, among other things, to the possibility that the sort of strategies employed during the Accord years – strategies of cooperation and consensus building – may provide a more effective means of bringing industrial peace to the workplace relations scene of the construction sector than policies that are relatively confrontational.

  4. Energy use for building construction. Final report, March 1, 1976--December 31, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Hannon, B M; Stein, R G; Segal, B; Serber, D; Stein, C

    1976-12-01

    Total (direct and indirect) energy requirements of the construction industry for 1967 were determined in order to examine the potential for energy savings. The Energy Input/Output Model developed at the Center for Advanced Computation, University of Illinois, was expanded to include 49 building and non-building construction sectors (new and maintenance). Total energy intensities were determined for these sectors, as well as energy requirements to final demand. Overall, the construction industry required about 6000 trillion Btu, or about 9% of the total U. S. energy requirement in 1967. About 20% of this requirement was for direct energy. Energy requirements were further broken down according to goods and services purchased by individual construction sectors, and energy distribution patterns were determined within each construction sector. Energy cost per unit for various building materials were calculated, as well as 1967 energy cost per square foot for building sectors. Laboratories required the most energy per square foot (2,074,056 Btu/SF), while Farm Service required the least (149,071 Btu/SF). Comparative interchangeable building assemblies were evaluated for their energy costs, including initial construction and lifetime maintenance energy. Tradeoffs between construction and operational energy costs were determined for a selected wall frame assembly with different exterior finishes and varying degrees of insulation. A study was initiated to determine industries in which direct energy use led to a significant amount of the energy embodied in New Building Construction for 1967. The resulting Energy Flow Chart is included.

  5. Renovation versus New Construction and Building Decision Tool for Educational Facilities

    OpenAIRE

    Pope, Carrie; Marks, Eric; Back, Edward; Leopard, Tim; Love, Thomas

    2016-01-01

    Renovation of an existing building is an accomplished stem of the construction industry because it supplies financial diversification for construction stakeholders. Although several construction planning tools and stakeholder alignment exercises have been developed, no tool exists to assist project owners to decide between renovating an existing building and new construction with a comprehensive decision criteria. The objective of this research is to create and test a renovation versus new bu...

  6. Prefabricated Construction using Digitally Integrated Industrial Manufacturing

    Directory of Open Access Journals (Sweden)

    Harry Giles

    2012-10-01

    Full Text Available The paper describes research being carried out in relation to prefabricated high density affordablehousing under a grant from the Partnership for the Advancement of Technology in Housing(PATH and the National Science Foundation (NSF in the USA. The objective is to demonstratehow a new paradigm for the conceptualization and construction of buildings can be conceivedof as an entirely factory based process that creates advantages for construction through industrialsystems technology transfer. Our approach is intended to transform design methodologythrough demonstrating how alternative construction concepts, using entirely pre-manufacturedvolumetric units, can be adopted. This involves digital modeling that facilitates parametric variationsfor creating customized prefabricated products from design conceptualization through tofinal product delivery. The paper discusses key areas under investigation in relation to a manufacturingparadigm used in the automotive industry that integrates virtual prototyping and industrialmanufacturing systems. Our research explores a type of monocoque volumetric unit prefabricatedin steel, which will be pre-finished as part of a modular factory-built approach usingindustrialized methodologies that will facilitate customized manufacture of a high quality energyefficient product for affordable housing.The paper addresses the automotive industry methods of manufacture that have served increasedautomobile performance and economics through mass production for over a century. In starkcontrast, the building industry and in particular the housing industry is still a century behind. It issuggested that a move away from tradition will require an industry wide initiative, just like HenryFord led the way with mass production. By embracing the increasing sophistication and capabilitythat digital technology offers, it is shown how digital tools are implemented towards masscustomization in house design using virtual modeling in the

  7. Recycled industrial and construction waste for mutual beneficial use.

    Science.gov (United States)

    2016-08-01

    Instead of going to landfills, certain waste materials from industry and building construction can be recycled in transportation infrastructure projects, such as roadway paving. The beneficial use of waste materials in the construction of transportat...

  8. Partnerships in Nordic Building Industry

    DEFF Research Database (Denmark)

    The project had two main objectives. The first was to establish a Nordic network of people and organisations interested in partnerships and partnering in the building industry in order to facilitate the exchange of experiences and new ideas. This objective was met through a series of workshops......, the functioning of specific partnering tools, knowledge management, training etc. Whereas the growth of partnering in all of the Nordic construction industries has developed from inspiration from the UK, and from other Nordic countries, it is the overall impression that partnering is interpreted, implemented...

  9. Sustainability-Related Decision Making in Industrial Buildings: An AHP Analysis

    Directory of Open Access Journals (Sweden)

    Jesús Cuadrado

    2015-01-01

    Full Text Available Few other sectors have such a great impact on sustainability as the construction industry, in which concerns over the environmental dimension have been growing for some time. The sustainability assessment methodology presented in this paper is an AHP (Analytic Hierarchy Process based on Multicriteria Decision Making (MCDM and includes the main sustainability factors for consideration in the construction of an industrial building (environmental, economic, and social, as well as other factors that greatly influence the conceptual design of the building (employee safety, corporate image. Its simplicity is well adapted to its main objective, to serve as a sustainability-related decision making tool in industrial building projects, during the design stage. Accompanied by an economic valuation of the actions to be undertaken, this tool means that the most cost-effective solution may be selected from among the various options.

  10. Construction of Buildings on Peat: Case Studies and Lessons Learned

    Directory of Open Access Journals (Sweden)

    Mahmod Ali Abdul-Wadoud

    2016-01-01

    Full Text Available Building construction on soft soils including on peat has many challenges and difficulties. The failed and deteriorated buildings have a big impact on the community. The IConCEES International Workshop 2015 which was conducted on October 2015 convened as a joint venture between Universiti Tun Hussein Onn Malaysia (UTHM and the University College of Technology Sarawak (UCTS. The aim was to invite regional experts from academia and the industry to formally present and discuss the various construction problems encountered when working with peat. The discussions were divided into two divisions; infrastructure and building construction. This paper discusses the outcomes of the workshop and focuses on the factors and relevant challenges when constructing buildings on peat. The experts have discussed regulatory and construction issues including: drainage issues, site investigation practices, monitoring and construction guidelines. A few suggestions were outlined as a remedy to these problems and to better assist the peat practitioner at work.

  11. Economic aspects of interlocking hollow brick system designed for industrialized building system

    Science.gov (United States)

    Tahir, Mahmood Md.; Saggaff, Anis; Ngian, Shek Poi; Sulaiman, Arizu

    2017-11-01

    Construction industry has moved forward into a technology driven where a transition is in progress from conventional method to a more advanced and mechanised system known as the Industrialised Building System (IBS). However, the need to implement the IBS should be well understood by all construction players such as designer, architect, contraction, erectors and construction workers. Therefore, there is a need to educate all these construction players which should be spearheaded by authorities such as Construction Industrial Development Board where enforcement trough building by laws as well as initiative to those that adopt the IBS in their construction. This paper reports on economic aspects of using interlocking hollow brick system in construction as an alternative method offered for Industrialized Building System. The main objective is to address the economic aspects of using interlocking block system in terms of time, costs, and utilization of manpower and to present some of the experimental tests results related to Interlocking Hollow Brick System (IHBS). Example of savings from the use of IHBS is presented in this paper by comparing the construction of two storey terrace house with build-up area of about 200 square meter with conventional construction method of typical reinforced concrete construction (RCC) compared to IHBS. The comparison shows that the implementation of IHBS can reduce construction time, cost, and utilization of man power up to 26.6% compared to the conventional method. Moreover, the construction time using IHBS can also be reduced by up to 50% as compared to the conventional construction.

  12. Process and system innovation in the building and construction industry: Developing a model for integrated value chain and life cycle management of built objects

    NARCIS (Netherlands)

    Ridder, H.A.J. de; Vrijhoef, R.

    2004-01-01

    The building and construction industry has a large contribution and impact on society, e.g. economical and environmental, involving a vast spectrum of stakeholders. However, the value delivering performance of the industry has often been criticized. The predictability of the value, price and costs

  13. Industry Research and Recommendations for New Commercial Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Hendron, B.; Leach, M.; Gregory, N.; Pless, S.; Selkowitz, S.; Matthew, P.

    2014-05-01

    Researchers evaluated industry needs and developed logic models to support possible future commercial new construction research and deployment efforts that could be led or supported by DOE's Commercial Building Integration program or other national initiatives. The authors believe that these recommendations support a proposed course of action from the current state of commercial building energy efficiency to a possible long-term goal of achieving significant market penetration of cost-effective NZE buildings in all building sectors and climates by 2030.

  14. ALGORITHM OF SELECTION EFFECTIVE SOLUTIONS FOR REPROFILING OF INDUSTRIAL BUILDINGS

    Directory of Open Access Journals (Sweden)

    MENEJLJUK A. I.

    2016-08-01

    Full Text Available Raising of problem.Non-compliance requirements of today's industrial enterprises, which were built during the Soviet period, as well as significant technical progress, economic reform and transition to market principles of performance evaluation leading to necessity to change their target and functionality. The technical condition of many industrial buildings in Ukraine allows to exploit them for decades.Redesigning manufacturing enterprises allows not only to reduce the cost of construction, but also to obtain new facilities in the city. Despite the large number of industrial buildings that have lost their effectiveness and relevance, as well as a significant investor interest in these objects, the scope of redevelopment in the construction remains unexplored. Analysis researches on the topic. The problem of reconstruction of industrial buildings considered in Topchy D. [3], Travin V. [9], as well as in the work of other scientists. However, there are no rules in regulatory documents and system studies for improving the organization of the reconstruction of buildings at realigning. The purpose of this work is the development an algorithm of actions for selection of effective organizational decisions at the planning stage of a reprofiling project of industrial buildings. The proposed algorithm allows you to select an effective organizational and technological solution for the re-profiling of industrial buildings, taking into account features of the building, its location, its state of structures and existing restrictions. The most effective organizational solution allows realize the reprofiling project of an industrial building in the most possible short terms and with the lowest possible use of material resources, taking into account the available features and restrictions. Conclusion. Each object has a number of unique features that necessary for considering at choosing an effective reprofiling variant. The developed algorithm for selecting

  15. A framework of initiatives for successful application of life cycle costing (LCC in industrialised building system (IBS in Malaysian construction industry

    Directory of Open Access Journals (Sweden)

    Shamsuddin Siti Mazzuana

    2017-01-01

    Full Text Available Industrialised Building System (IBS contributes a great shift in sustainable construction and benefits the society. Previous studies have proven in general that one of the hindrances in promoting sustainable in IBS, is a high cost for any pre-cast material specifically thus effected the overall cost. The introduction of Life Cycle Costing (LCC leads into providing a better and comprehensive cost estimation, including projecting actual cost to operate the building, hence providing a better baseline for decision making. The lacking application of LCC in IBS is still in trivial impact, therefore, this paper presents a framework which produced by expressing the successful initiatives of LCC and IBS in Malaysia construction industry. The framework developed based on findings from the extensive literature reviews, 164 responded questionnaires, and 19 expert opinions, which has three sections: Strategy Development, System Development and the last part is Decision Level. Aspects of objectivity, practicality, reliability, completeness that were likely to be implemented in the Malaysian construction industry were used. There are significant opinions on the usefulness and completeness of the proposed framework in providing a comprehensive cost estimates which helps much in deciding to carry out IBS or remain with a traditional construction method.

  16. PERCEPTION OF BUILDING CONSTRUCTION WORKERS TOWARDS SAFETY, HEALTH AND ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    C.R. CHE HASSAN

    2007-12-01

    Full Text Available The construction industry is known as one of the most hazardous activities. Therefore, safety on the job site is an important aspect with respect to the overall safety in construction. This paper assesses the safety level perception of the construction building workers towards safety, health and environment on a construction job site in Kuala Lumpur, Malaysia. The above study was carried out by choosing 5 selected large building construction projects and 5 small building construction projects respectively in and around Kuala Lumpur area. In the present study, an exhaustive survey was carried out in these 10 project site areas using a standard checklist and a detailed developed questionnaire. The checklist comprised 17 divisions of safety measurements which are considered and perceived to be important from the safety point of view and was assessed based on the score obtained. The questionnaire comprised the general information with 36 safety attitude statements on a 1-5 Likert scale which was distributed to 100 construction workers. The results of the checklist show the difference of safety levels between the large and small projects. The study revealed that the large projects shown a high and consistent level in safety while the small projects shown a low and varied safety levels. The relationship between the factors can be obtained from the questionnaire. They are organizational commitment, factor influencing communication among workmates, worker related factors, personal role and supervisors’ role factors, obstacles to safety and safe behavior factors and management commitment at all levels in line with the management structure and risk taking behavioral factors. The findings of the present study revealed invaluable indications to the construction managers especially in improving the construction workers’ attitude towards safety, health and environment and hence good safety culture in the building construction industries.

  17. Innovation Barriers and Enablers that Affect Productivity in Uganda Building Industry

    OpenAIRE

    Henry Mwanaki Alinaitwe, , and; Kristian Widén; Jackson Mwakali; Bengt Hansson

    2007-01-01

    The construction industry has of recent been blamed for lack of innovation. Lack of innovation in the industry is believed to be responsible for the decreasing or stagnant levels of productivity in comparison with other industries. This paper reviews the major barriers and enablers to innovation in general. Propositions were made about the factors that affect innovation in the construction industry which were then formulated into a questionnaire. A survey was made on building contractors in U...

  18. The development of public and private construction procurement systems in the Malaysian construction industry

    Directory of Open Access Journals (Sweden)

    Mastura Jaafar

    2012-12-01

    Full Text Available As demand on building construction projects rises, various procurement methods have been adapted to suit with unique project requirements. However, poor industry performance and rapid developments within it indicate the need for a research on the procurement systems in the industry. In order to explore the development of procurement systems in Malaysia, a discussion on different economic phases which influence the routes of procurement systems and its evolution in Malaysia's construction industry is initiated. Subsequently, based on a questionnaire survey collected from 73 public and 68 private parties, the significant and dominant role of traditional procurement system used by both the public and private sectors in Malaysia can be confirmed. Further, compared to the public sector, the private sector is observed to be more aggressive in adapting alternative systems such as design and build (D&B and Turnkey. Further elaboration on the research findings is covered in the discussion section.

  19. Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery

    Directory of Open Access Journals (Sweden)

    Sungmin Yun

    2017-06-01

    Full Text Available Despite the efforts for sustainability studies in building and infrastructure construction, the sustainability issues in industrial construction remain understudied. Further, few studies evaluate sustainability and benchmark sustainability issues in industrial construction from a management perspective. This study presents a phase-based benchmarking framework for evaluating sustainability practices use focusing on industrial facilities project. Based on the framework, this study quantifies and assesses sustainability practices use, and further sorts the results by project phase and major project characteristics, including project type, project nature, and project delivery method. The results show that sustainability practices were implemented higher in the construction and startup phases relative to other phases, with a very broad range. An assessment by project type and project nature showed significant differences in sustainability practices use, but no significant difference in practices use by project delivery method. This study contributes to providing a benchmarking method for sustainability practices in industrial facilities projects at the project phase level. This study also discusses and provides an application of phase-based benchmarking for sustainability in industrial construction.

  20. Innovation Barriers and Enablers that Affect Productivity in Uganda Building Industry

    Directory of Open Access Journals (Sweden)

    Henry Mwanaki Alinaitwe, , and

    2007-06-01

    Full Text Available The construction industry has of recent been blamed for lack of innovation. Lack of innovation in the industry is believed to be responsible for the decreasing or stagnant levels of productivity in comparison with other industries. This paper reviews the major barriers and enablers to innovation in general. Propositions were made about the factors that affect innovation in the construction industry which were then formulated into a questionnaire. A survey was made on building contractors in Uganda, a developing country, targeting those with financial strength, large in size, and with high capacity to carry out big projects. The identified factors were then ranked and correlated. The level of training in science, engineering and technical education, and the level of research and development at the industry level are looked at as the greatest innovation enablers in building that will drive forward labour productivity. The size of the domestic market and the level of security are the worst innovation barriers that lead to low productivity in the building industry in Uganda. Contractors, policy makers and the government should address the identified factors in order to improve productivity.

  1. Modeling injury rates as a function of industrialized versus on-site construction techniques

    OpenAIRE

    Rubio Romero, Juan Carlos; Suárez Cebador, Manuel; Abad Puente, Jesús

    2014-01-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed tha...

  2. How can new technology, improve façade construction of office building, in Iran

    OpenAIRE

    Saberi, Akbar

    2014-01-01

    It is evident that available technologies on office building sector in Shiraz relay on traditional construction especially on wet methods. Wet system process depends on human interpretation (The human interpretation is the basics of the systems) which cause major problems in construction quality. For this propose this dissertation focus on construction method in office building in Iran. Compared to wet construction, dry system is new technology in the construction industry. ...

  3. The Barriers and Causes of Building Information Modelling Usage for Interior Design Industry

    Science.gov (United States)

    Hamid, A. B. Abd; Taib, M. Z. Mohd; Razak, A. H. N. Abdul; Embi, M. R.

    2017-12-01

    Building Information Modeling (BIM) has since developed alongside the improvement in the construction industry, purposely to simulate the design, management, construction and documentation. It facilitates and monitors the construction through visualization and emphasizes on various inputs to virtually design and construct a building using specific software. This study aims to identify and elaborate barriers of BIM usage in interior design industry in Malaysia. This study is initiated with a pilot survey utilising sixteen respondents that has been randomly chosen. Respondents are attached with interior design firms that are registered by Lembaga Arkitek Malaysia (LAM). The research findings are expected to provide significant information to encourage BIM adoption among interior design firms.

  4. Experiences with the design and production of an industrial, flexible and demountable (IFD) building system

    NARCIS (Netherlands)

    Gassel, van F.J.M.; Stone, W.C.

    2002-01-01

    The Dutch government encourages innovative construction by subsidizing cohesive industrial, flexible and demountable building (lFD) pilot projects. Industrial building concerns the process-related aspects of production. robotization, mechanization, automation, prefabrication, communication, etc.

  5. Occupational Accidents: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Tauha Hussain Ali

    2014-07-01

    Full Text Available It has been observed that the construction industry is one of the notorious industry having higher rate of fatalities and injuries. Resulting in higher financial losses and work hour losses, which are normally faced by this industry due to occuptional accidents. Construction industry has the highest occupational accidents rate recorded throughout the world after agriculture industry. The construction work site is often a busy place having an incredibly high account of activities taking place, where everyone is moving in frenzy having particular task assigned. In such an environment, occupational accidents do occur. This paper gives information about different types of occupational accidents & their causes in the construction industry of Pakistan. A survey has been carried out to identify the types of occupational accidents often occur at construction site. The impact of each occupational accident has also been identified. The input from the different stakeholders involved on the work site was analyzed using RIW (Relative Importance Weight method. The findings of this research show that ?fall from elevation, electrocution from building power and snake bite? are the frequent occupational accidents occur within the work site where as ?fall from elevation, struck by, snake bite and electrocution from faulty tool? are the occupational accident with high impact within the construction industry of Pakistan. The results also shows the final ranking of the accidents based on higher frequency and higher impact. Poor Management, Human Element and Poor Site Condition are found as the root causes leading to such occupational accidents. Hence, this paper

  6. Sustainable Entrepreneurship in the Dutch Construction Industry

    Directory of Open Access Journals (Sweden)

    Rosalinde J.A. Klein Woolthuis

    2010-02-01

    Full Text Available This article discusses the strategies that sustainable entrepreneurs use to interact with their environment in the Dutch construction industry. The Dutch construction industry is under great pressure to move towards sustainability, and entrepreneurs are believed to be able to play a large role in this transition by introducing new products and new business practices. But how can entrepreneurs prosper in an environment that is not geared up towards such a change? And which strategies do they use to bend conditions in their favor? In this article we make use of the Market and System Failure Framework to analyze the pressures that entrepreneurs are confronted with when introducing sustainable innovations. We recognize that these pressures can be seen as bottlenecks, but that market and system failures can also create entrepreneurial opportunities. We interviewed 16 entrepreneurs in the Dutch construction industry to determine the influences they experienced from their environment and the strategies they use to deal with these. We conclude that we can distinguish between system building and following entrepreneurs, where the former aims to build a new system to challenge the old one, whereas the latter rather makes use of existing structures to build a business. We find that both strategies can be successful and that overall, the entrepreneurs confirm the belief that sustainability on people, planet and transparency aspects, can contribute very well to the long term profitability of the businesses the entrepreneurs are running. These in-depth insights into the influences from the context on the one hand, and the entrepreneurs’ strategic reactions on the other hand, contribute to our understanding of the interactions between entrepreneurs and the system context. This can help us to more effectively stimulate and support innovating entrepreneurs to contribute to the transition towards sustainability.

  7. Improving Productivity in Building Construction – by Repetitions in Products, Processes, and Organisations

    DEFF Research Database (Denmark)

    Bekdik, Baris

    This thesis builds on several studies with connection to the lack of productivity in build-ing construction. It seeks to enhance the conditions for improving productivity in the fragmented building construction industry, by exploring how a modular thinking of products, processes and organisations...... can be reapplied on new building construction projects. Complexity theory is used for diagnosis and modularity theory for the remedy towards the high degree of complexity, which is seen as the root of unproductivity. De-sign Research Methodology is followed to structure and organise the different...... from the practitioner’s perspective. In the second part of the exploratory study, examples of the fragmented kinds of modu-lar applications around the world are compiled in order to demonstrate the inconsistent use, but still universal appeal that the approach carries with respect to building construc-tion...

  8. Occupational accidents: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Ali, T.H.; Khahro, S.H.; Memon, F.A.

    2014-01-01

    It has been observed that the construction industry is one of the notorious industry having higher rate of facilities and injuries. Resulting in higher financial losses and work hour losses, which are normally faced by this industry due to occupational accidents. Construction industry has the highest occupational accidents rate recorded throughout the world after agriculture industry. The construction work site is often a busy place having an incredibly high account of activities taking place, where everyone is moving in frenzy having particular task assigned. In such an environment, occupational accidents do occur. This paper gives information about different types of occupational accidents and their causes in the construction industry of Pakistan. A survey has been carried out to identify the types of occupational accidents often occur at construction site. The impact of each occupational accident has also been identified. The input from the different stakeholders involved on the work site was analyzed using RIW (Relative Importance Weight) method. The findings of this research show that fall from elevation, electrocution from building power and snake bite are the frequent occupational accidents occur within the work site where as fall from elevation, struck by, snake bite and electrocution from faulty tool are the occupational accident with high impact within the construction industry of Pakistan. The results also shows the final ranking of the accidents based on higher frequency and higher impact. Poor Management, Human Element and Poor Site Condition are found as the root causes leading to such occupational accidents. Hence, this paper identify that what type of occupational accidents occur at the work place in construction industry of pakistan, in order to develop the corrective actions which should be adequate enough to prevent the re-occurrence of such accidents at work site. (author)

  9. Optimalisation of national industry participation in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sriyana

    2008-01-01

    A study of national industry participation based on recent data has already been conducted. The current industry data is used to estimate the optimum level of national industry participation in nuclear power plant (NPP) construction based on the prior study. The purpose of the study is to give a figure of the optimum level of national industry participation in NPP construction. The scope of the study is the NPP construction project in related to the potency of national industry to participate in the project. The methodology used in the study are literature study, web surfing for industrial data, and on-the-spot industry survey that are potential to participate in NPP construction. In addition to that, discussion with expertise of industrial practitioner was also conducted. The study concludes that (1) based on the recent national industry capability provided and compared to prior similar study, it is estimated that the level of national industry participation in the first NPP construction with the capacity of 1000 MWe PWR is about 40%. (2) to accelerate NPP technology transfer, we need to build a small size NPP. The nuclear island will be developed by BATAN in cooperation with national industry and the non-nuclear island will be developed by national industry. Universities and other academicians should be involved to support and keep the sustainability of man power availability in developing the NPP technology. (author)

  10. Program-oriented approach to resource saving issues in construction materials industry

    Directory of Open Access Journals (Sweden)

    Novikova Galina

    2017-01-01

    Full Text Available The construction as a sector of the economy is one of the largest consumers of energy resources, and the building materials industry is today one of the most energy-intensive construction industry. At the enterprises of the building materials industry the different approaches and methods are used to solve resource and energy problems. Energy saving is considered not as an complex approach in the enterprise activity, but as activity for the implementation of specific energy-saving projects, which have limitations in time and in resources. The authors suggest to use a softwareoriented approach to solving the problems of resource and energy saving. For practical application of program-oriented approach we offer to use a structuring method of the decision-making, not previously used to solve problems of resource and energy saving.

  11. Design Solutions for Sustainable Construction of Pre Engineered Steel Buildings

    Directory of Open Access Journals (Sweden)

    Muhammad Umair Saleem

    2018-05-01

    Full Text Available Sustainable construction of ecofriendly infrastructure has been the priority of worldwide researchers. The induction of modern technology in the steel manufacturing industry has enabled designers to get the desired control over the steel section shapes and profiles resulting in efficient use of construction material and manufacturing energy required to produce these materials. The current research study is focused on the optimization of steel building costs with the use of pre-engineered building construction technology. Construction of conventional steel buildings (CSB incorporates the use of hot rolled sections, which have uniform cross-section throughout the length. However, pre-engineered steel buildings (PEB utilize steel sections, which are tailored and profiled based on the required loading effects. In this research study, the performance of PEB steel frames in terms of optimum use of steel sections and its comparison with the conventional steel building is presented in detail. A series of PEB and CSB steel frames is selected and subjected to various loading conditions. Frames were analyzed using Finite Element Based analysis tool and design was performed using American Institute of Steel Construction design specifications. Comparison of the frames has been established in terms of frame weights, lateral displacements (sway and vertical displacements (deflection of the frames. The results have clearly indicated that PEB steel frames are not only the most economical solution due to lesser weight of construction but also have shown better performance compared to CSB frames.

  12. Successful verification of subcontracted work in the construction industry

    NARCIS (Netherlands)

    Makkinga, Rick; de Graaf, Robin; Voordijk, Hans

    2018-01-01

    Due to the introduction of new types of contracts, such as Design, Build, Finance, & Maintain (DBFM), a major shift in tasks and responsibilities from client to contractor can be seen in the construction industry. To manage these new contracts and corresponding shifts in responsibilities, systems

  13. Carbon footprint of construction using industrialised building system

    Science.gov (United States)

    Lim, P. Y.; Yahya, K.; Aminudin, E.; Zakaria, R.; Haron, Z.; Mohamad Zin, R.; Redzuan, A. A. H.

    2017-11-01

    Industrialised Building System (IBS) is more sustainable to the environment as compared to the conventional construction methods. However, the construction industry in Malaysia has low acceptance towards IBS due to the resistance to change and also lack of awareness towards sustainability development. Therefore, it is important to study the amount carbon footprint produced by IBS during its manufacturing and construction stage, and also the amount of carbon footprint produced by one meter square of gross floor area of IBS construction using Life Cycle Assessment (LCA) to ease future research through the comparison of the carbon footprint of IBS with the conventional building system. As a result, a case study on a residential type of construction in the vicinity of Johor Bahru, Malaysia was carried out to obtain the necessary data and result. From the data analysis, the amount of greenhouse gases (GHG) for a residential type IBS construction based on the raw materials and resources involved to manufacture and construct IBS components is 0.127 tonnes fossil CO2Eq per meter square. Raw material that contributed to the most amount of carbon footprint is Ordinary Portland Cement (OPC), followed by steel bars, autoclaved aerated blocks and diesel. The LCA data acquired will be very useful in implementing IBS in the residential type construction. As a result, the awareness towards sustainable construction using IBS can be improved.

  14. Sustainable development and construction industry in Malaysia

    Directory of Open Access Journals (Sweden)

    Suliman L. Kh. M.

    2009-12-01

    Full Text Available Sustainable construction is a way for the building and infrastructure industry to move towards achieving sustainable development, taking into account environmental, socioeconomic and cultural issues. Differing approaches and differing economic markets lead to different priorities. This paper presents the construction scenario of Malaysia and the developments in sustainable construction taking place in this country. Barriers to the implementation of sustainable construction are discussed. A list of recommendation was proposed to drive sustainable construction in this country. In conclusion, the status of sustainable construction in Malaysia is still in its infancy. The lack of awareness, training and education, ineffective procurement systems, existing public policies and regulatory frameworks are among the major barriers for sustainable construction in Malaysia. Besides the needs for capacities, technologies and tools, total and ardent commitment by all players in the construction sectors including the governments and the public atlarge are required in order to achieve sustainable construction in Malaysia.

  15. THE RELATIONSHIP BETWEEN MOTIVES AND BENEFITS ON ADOPTING QLASSIC – CIS 7: 2006 IN MALAYSIA CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Kenn Jhun Kam

    2012-12-01

    Full Text Available This paper reviews on the building contractors motivating factors on adopting the newly imposed quality assurance initiative in Malaysia's construction industry. The quality assurance initiative named Quality Assessment System in Construction (QLASSIC - The Construction Industry Standard (CIS - CIS 7:2006. It is introduced by the Construction Industry Development Board of Malaysia (CIDB. This QLASSIC system consists of a building construction standard where all the contractors must follow the specification, if adopting this system in their construction project. Literature commonly categorized motivation factor into two types, which are internally and externally. Both types of motivation factors are put into study in related to the benefits on adopting the QLASSIC system. Further analysis will be done to determine the motives and benefits relationship behind the adoption of the QLASSIC system in the construction projects.

  16. THE PROJECT MANAGEMENT OF INDUSTRIAL BUILDINGS REENGINEERING (RECONSTRUCTION AND COMPLETION

    Directory of Open Access Journals (Sweden)

    K. Kolesnikova

    2017-06-01

    Full Text Available Creative element fate of any activity may not fall to zero because of the turbulent environment in which these activities are carried out, always prevents this. Environment that makes each building unique, that is, provides the main basis of the project. When we are talking about complex construction, the share of the creative component becomes very significant. First and foremost, this is explained by the duration of the construction work, during which time to happen risk events. The article analyses the processes of construction from the point of view of their conformity to the concept of project activities. It is shown that with increasing degree of difficulty of construction or time of the last share of creative activities in the overall project grows. In recent times more and more widespread work on re-engineering complex systems, for example, building constructions. This means repair of the building, but not a simple repair with restoration of the original, incorporated in the design of building elements and their interfaces, and partial or full replacement of items that fail or are outdated, new ones require first, a new design of their structures and production technologies, as well as the design of the accessories for the installation and technology is reshaping the object. Combining the two above-mentioned factors of growth of the share of creative activities during the project management of the re-engineering of building structures: complexity and construction time, received a cognitive model of such growth. Introduced the concept of "reengineering in construction" as a combination of the processes of adjustment and worn or completion of unfinished buildings. It is proved that any re-engineering in construction is the project activities. Provisions are tested in a real reengineering of industrial buildings with a positive technical and economic effect.

  17. THE PROJECT MANAGEMENT OF INDUSTRIAL BUILDINGS REENGINEERING (RECONSTRUCTION AND COMPLETION

    Directory of Open Access Journals (Sweden)

    Katerina Kolesikova

    2017-05-01

    Full Text Available Creative element fate of any activity may not fall to zero because of the turbulent environment in which these activities are carried out, always prevents this. Environment that makes each building unique, that is, provides the main basis of the project. When we are talking about complex construction, the share of the creative component becomes very significant. First and foremost, this is explained by the duration of the construction work, during which time to happen risk events. The article analyses the processes of construction from the point of view of their conformity to the concept of project activities. It is shown that with increasing degree of difficulty of construction or time of the last share of creative activities in the overall project grows. In recent times more and more widespread work on re-engineering complex systems, for example, building constructions. This means repair of the building, but not a simple repair with restoration of the original, incorporated in the design of building elements and their interfaces, and partial or full replacement of items that fail or are outdated, new ones require first, a new design of their structures and production technologies, as well as the design of the accessories for the installation and technology is reshaping the object. Combining the two above-mentioned factors of growth of the share of creative activities during the project management of the re-engineering of building structures: complexity and construction time, received a cognitive model of such growth. Introduced the concept of "reengineering in construction" as a combination of the processes of adjustment and worn or completion of unfinished buildings. It is proved that any re-engineering in construction is the project activities. Provisions are tested in a real reengineering of industrial buildings with a positive technical and economic effect.

  18. Market in Germany. Renewable energy and energy conservation in the German construction industry

    International Nuclear Information System (INIS)

    2008-02-01

    This market survey for Germany is on the subject of renewable energy and energy efficient constructing and housing improvement. In order to meet sectoral or thematic information needs of Dutch exporting industries and investing companies, the EVD facilitates the realisation of up-to-date market surveys on promising markets in selected countries. The requested study is very relevant for the Dutch exporting industry, as the German building and construction market is of increasing importance to the Dutch building, installation and equipment building sector. Moreover the German market is a European innovator on renewable energy (RE) and energy efficient (EE) homes or even so-called 'passive' houses. The developments in the German market can guide the Dutch industry in the development of their export strategies. The main target groups for the market surveys are small- and medium-sized enterprises (SMEs) in the Netherlands. Interesting groups among these SMEs are those enterprises that start their business on a foreign market [nl

  19. Process and building information modelling in the construction industry by using information delivery manuals and model view definitions

    DEFF Research Database (Denmark)

    Karlshøj, Jan

    2012-01-01

    The construction industry is gradually increasing its use of structured information and building information modelling.To date, the industry has suffered from the disadvantages of a project-based organizational structure and ad hoc solutions. Furthermore, it is not used to formalizing the flow...... of information and specifying exactly which objects and properties are needed for each process and which information is produced by the processes. The present study is based on reviewing the existing methodology of Information Delivery Manuals (IDM) from Buildingsmart, which also is also an ISO standard 29481...... Part 1; and the Model View Definition (MVD) methodology developed by Buildingsmart and BLIS. The research also includes a review of concrete IDM development projects that have been developed over the last five years. Although the study has identified interest in the IDM methodology in a number...

  20. Developing and Testing a Tool to Evaluate BIM Maturity : Sectoral Analysis in the Dutch Construction Industry

    NARCIS (Netherlands)

    Siebelink, Sander; Voordijk, Johannes T.; Adriaanse, Arjen

    2018-01-01

    This study's objective was to evaluate the status of building information modelling (BIM) implementation within the Dutch construction industry by means of a developed BIM maturity tool that could be applied within the construction industry's various disciplines. Existing BIM maturity models tend to

  1. VE of construction industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-10-15

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  2. VE of construction industry

    International Nuclear Information System (INIS)

    1987-10-01

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  3. How clients influence building projects - a comparison of the construction industry and the petroleum industry in Norway

    OpenAIRE

    Evju, Mads; Mai, Nam Bao Nguyen

    2014-01-01

    Master's thesis in Industrial economics Several studies indicate the need for competence and quality improvement in the Norwegian construction industry. Findings show that diversity in client groups can lead to different levels of competence. This poses many challenges to the industry and those involved, all of which will be highlighted in this thesis. The objective of this thesis is to provide an understanding of how clients’ levels of competence and focus can influence the final resu...

  4. Advanced FRP for flooring in buildings: a low carbon material application in the construction industry

    OpenAIRE

    Gao, Yijian

    2013-01-01

    Fibre-reinforced polymers (FRP) are building materials that permit both the improvement of long-term building performance and the simplification of the construction process, thanks to their high specific strength, low thermal conductivity, good environmental resistance, and ability to be formed into complex shapes. FRP materials are well-suited to fulfilling many building functions. By integrating traditionally separate building systems and layers into single function-integrated components, a...

  5. The Significance of Coordination for Industrialised Building System (IBS Precast Concrete in Construction Industry

    Directory of Open Access Journals (Sweden)

    Fitri Othman Mohd Khairul

    2017-01-01

    Full Text Available IBS precast concrete is construction system which is meant to improve the conventional construction process. However IBS precast concrete projects are suffering from serious problems such as cost overrun, delays and less quality of the end product. The absence of coordination is perceived as the reason for this issue. The purpose of this paper is to review the significance of coordination for IBS precast concrete in the construction industry. It if found that the fragmentation which occurs in the construction industry requires continuity of coordination due to the construction activities are intertwined in nature. Coordination is designated to assist stakeholders in completing and complementing each other with the paramount focus of achieving the objective. Proper coordination is required in delivering the desired construction product at the ideal time, cost and quality. As for the findings, the significance of coordination for IBS precast concrete can be seen through the precast concrete construction phases which consist of planning; design; manufacturing; transportation and installation/construction. These phases are meant to complement construction process with the purpose to reduce issues of fragmentation and enhance IBS precast concrete project delivery.

  6. Construction of Industrial Ecosystem of an Electric Company under Ecological Perspective

    Science.gov (United States)

    Li, Xin; Zhang, Yuan; Wu, Han

    2018-01-01

    Be confronted with more and more fierce competition environment, only by constantly integrating, constructing and restructuring internal and external resources as well as capabilities can enterprises adapt themselves to the rapidly changing environment and maintain the advantages of sustained competition. Business competition has changed from product competition of single enterprise to competition of bussiness ecosystem. Therefore, how to build a business system is the key to win competition. This paper draws lessons from business ecosystem and industrial ecosystem concept and takes the subordinate industry company of a large enterprise as the research object. On the the basis of combing its characteristics and organizational structure, an industrial ecosystem is tired to constructed.

  7. MANAGEMENT PROCESS OF HEALTH AND SAFETY RISK IN THE NIGERIA CONSTRUCTION INDUSTRY

    OpenAIRE

    Akwu, Ifeoma Claris

    2017-01-01

    The study examined the state of health and safety risk management practices in the building sector of the construction industry with the objective to examine the health and safety risk management processes adopted by the construction industry in Nigeria; the study adopted the survey and case study research design. It employed the use of Delphi’s technique in the distribution of questionnaire and made use of chi-square analytical technique for the analysis of gathered data. The findings reveal...

  8. DEVELOPMENT OF THE STATE SUPPORT FORMS PROJECTS IN INDUSTRIAL BUILDING

    Directory of Open Access Journals (Sweden)

    I. M. Meilanov

    2016-01-01

    Full Text Available Aim. The topicality of the research is stipulated by the objective necessity of the organizational and economic mechanism improvement of the state support projects of the industrial building. The aim of the research is the development of conceptual provisions and methodological foundations of financial projects creating conditions for economic growth of Russia based on the construction and putting into effect industrial objects.Methods. In the course of the research the system, subject-functional and structural approaches were implemented to solve the problems set widening the scope of the complex approach to assessment of the current operating mechanism of the state financial support of the projects and financial volume; to criteria stipulation of the most effective projects contest selection: to the search of the investment resources accumulation instrument into industrial building.Results. It is stipulated that state investment policy in industrial building mechanism oriented to define rational investment volumes and their branch, reproductive, technological and territorial structure; option of the building branch development priority; increase of the investment projects efficiency realization. The dynamics of the state support in the form of subsidies and budget investments into creation of the industrial building objects is analytically summarized. It is determined that the peculiarity of the modern state support projects of industrial building is transition from budget allocations distribution between branches and regions to selective and partial financing of specific investment projects on competitive basis. Some tactics of state and private partnership attracting private capital without losing strategic state control under systems and objects are defined. As an effective form of the industrial building support projects it is proposed to use a concession model form: projecting - building- financing- ownership - exploitation

  9. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    OpenAIRE

    Gurmu, Argaw Tarekegn; Aibinu, Ajibade Ayodeji; Chan, Toong Khuan

    2016-01-01

    This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry...

  10. Mechanical behavior of sustainable building materials using PET waste and industrial by-products

    OpenAIRE

    Juárez, C. A; Mendoza-Rangel, J. M; González, J. R; Rodríguez, J. A; Valdez, P

    2015-01-01

    The building industry is facing the challenge of satisfying a growing demand for housing spaces that can be mitigated by the use of construction materials manufactured with industrial by-products that allow the production of low-cost housing with a low environmental impact. In this research, an alternative building system to manufacture lightweight masonry blocks with polyethylene terephthalate (PET) bottles and fiber-reinforced panels using binary mixture (Portland cement and fly ash), was s...

  11. Towards Implementation of Green Technology in Sabah Construction Industry

    Science.gov (United States)

    Azland Jainudin, Noor; Jugah, Ivy; Nasrizal Awang Ali, Awang; Tawie, Rudy

    2017-12-01

    The construction industry in Sabah is one of the major roles for development of social, economic infrastructures and buildings in generating wealth to the state besides the tourism sector. The increasing number of construction projects particularly in the rapid developing city of Kota Kinabalu, green technology as a whole is becoming more significant as it helps to develop effective solutions to encounter global environmental issues. The objective of the research is to identify the awareness and implementation of green technology in construction industry in Kota Kinabalu, Sabah. The methodology of the research is through distributing the questionnaire to the contractors, developers, consultants, architects and state government agencies to the area in Kota Kinabalu only. The questionnaires had been analysed to find out the mean value. 100 questionnaires distributed to the respondents but merely 85 questionnaires collected have been analysed. Based on the findings, 83.5% organisations were aware with the concept of green technology in construction project. In terms of the implementation only 64.7% had been implemented in their organizations. More than 50% from the major players such as contractors, consultants, developers, architects and state government agencies were aware based on six green technology concepts in their organizations. As a conclusion, the awareness towards green policy concept in construction industry is very satisfied. Meanwhile, in terms of implementation need to be increased the number of organizations to be involved in green technology in construction industry.

  12. Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia

    Directory of Open Access Journals (Sweden)

    Jian Li

    2014-08-01

    Full Text Available Building Information Modelling (BIM is a process involving the creation and management of objective data with property, unique identity and relationship. In the Architecture, Engineering and Construction (AEC industry, BIM is adopted a lot in the lifecycle of buildings because of the high integration of information that it enables. Four-dimensional (4D computer-aided design (CAD has been adopted for many years to improve the construction planning process. BIM is adopted throughout buildings' lifecycles, in design, construction and operation. This paper presents five large-scale public and financial projects that adopt BIM in the design, construction and operational phases. Different uses of BIM are compared and contrasted in the context of the separate backgrounds. It is concluded that productivity is improved where BIM is used to enable easy sharing and integration of information and convenient collaboration.

  13. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    Science.gov (United States)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  14. The oil industry experience. Technology cooperation and capacity building

    International Nuclear Information System (INIS)

    1995-01-01

    Technology cooperation is defined as a process of constructive interaction with local, national and international partners to select and apply appropriate technology systems to achieve environmentally sound forms of economic development. Capacity building is the process of constructive interaction between countries and the private sector designed to develop the capability and skills to achieve environmentally sound forms of economic development through the use of modern technologies and management systems, a competent workforce and appropriate laws and regulations. Twelve case histories are presented which demonstrate the efforts of the oil industry to work in partnership with governments, contractors, suppliers and communities in technology cooperation and capacity building to achieve the goals of Agenda 21 which emerged as an action plan from the Rio Earth Summit in 1992. (UK)

  15. Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method

    Science.gov (United States)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat

    2017-07-01

    Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.

  16. GBI assessment checklist: Level of awareness of the contractors in the Malaysian construction industry

    Science.gov (United States)

    Marhani, M. A.; Muksain, M. A. S.

    2018-02-01

    Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.

  17. Waste Management in Industrial Construction: Investigating Contributions from Industrial Ecology

    Directory of Open Access Journals (Sweden)

    Larissa A. R. U. Freitas

    2017-07-01

    Full Text Available The need for effective construction waste management is growing in importance, due to the increasing generation of construction waste and to its adverse impacts on the environment. However, despite the numerous studies on construction waste management, recovery of construction waste through Industrial Symbiosis and the adoption of other inter-firm practices, comprised within Industrial Ecology field of study, have not been fully explored. The present research aims to investigate Industrial Ecology contributions to waste management in industrial construction. The waste management strategies adopted in two industrial construction projects in Brazil are analyzed. The main waste streams generated are identified, recycling and landfilling diversion rates are presented and waste recovery through Industrial Symbiosis is discussed. A SWOT analysis was carried out. Results demonstrate that 9% of the waste produced in one of the projects was recovered through Industrial Symbiosis, while in the other project, waste recovery through Industrial Symbiosis achieved the rate of 30%. These data reveal Industrial Symbiosis’ potential to reduce landfilling of industrial construction wastes, contributing to waste recovery in construction. In addition, results show that industrial construction projects can benefit from the following synergies common in Industrial Ecology place-based approaches: centralized waste management service, shared waste management infrastructure and administrative simplification.

  18. Infrared survey of 50 buildings constructed during 100 years: thermal performances and damage conditions

    Science.gov (United States)

    Ljungberg, Sven-Ake

    1995-03-01

    Different building constructions and craftsmanship give rise to different thermal performance and damage conditions. The building stock of most industrial countries consists of buildings of various age, and constructions, from old historic buildings with heavy stone or wooden construction, to new buildings with heavy or light concrete construction, or modern steel or wooden construction. In this paper the result from a detailed infrared survey of 50 buildings from six Swedish military camps is presented. The presentation is limited to a comparison of thermal performance and damage conditions of buildings of various ages, functions, and constructions, of a building period of more than 100 years. The result is expected to be relevant even to civilian buildings. Infrared surveys were performed during 1992-1993, with airborne, and mobile short- and longwave infrared systems, out- and indoor thermography. Interpretation and analysis of infrared data was performed with interactive image and analyzing systems. Field inspections were carried out with fiber optics system, and by ocular inspections. Air-exchange rate was measured in order to quantify air leakages through the building envelope, indicated in thermograms. The objects studied were single-family houses, barracks, office-, service-, school- and exercise buildings, military hotels and restaurants, aircraft hangars, and ship factory buildings. The main conclusions from this study are that most buildings from 1880 - 1940 have a solid construction with a high quality of craftsmanship, relatively good thermal performance, due to extremely thick walls, and adding insulation at the attic floor. From about 1940 - 1960 the quality of construction, thermal performance and craftsmanship seem to vary a lot. Buildings constructed during the period of 1960 - 1990 have in general the best thermal performance due to a better insulation capacity, however, also one finds here the greatest variety of problems. The result from this

  19. Collapse simulation of building constructions

    Directory of Open Access Journals (Sweden)

    Nekrest'yanov Viktor Nikolaevich

    Full Text Available The physical reasons for building structures destruction are both the forces arising at stress-strain state of construction elements and external influences arising at emergency situations, as well as their moments, impulses and periodic impulses with the frequencies close to of fluctuations frequencies of construction elements. We shall call the mathematical calculation models for the parameters-reasons of destructions the basic models. The basic models of destruction of building structures elements allow not only providing necessary level of reliability and survivability of the elements and the construction as a whole already at the stage of their design, but also giving the chance, at their corresponding completion, to provide rational decisions on the general need of recovery works and their volume depending on destruction level. Especially important for rational design decisions development, which ensure the demanded constructional safety of building structures, is library creation of the basic mathematical models of standard processes of bearing elements destructions for standard construction designs for the purpose of the further forecast (assessment of the level and probabilities of standard destructions. Some basic mathematical models of destructions processes of the standard elements of building structures are presented in the present article. A model of accounting for construction defects and a model of obtaining requirements to probabilities of partial destructions of a construction are given. Both of these models are probabilistic.

  20. Communication of Ergonomics in building and construction.

    Science.gov (United States)

    Wiberg, Viveca

    2012-01-01

    For the coming years SWEA is planning for communication and information actions. One of the sectors concerned is the building and construction industry. Focus of the information is to avoid accidents and injuries, and how companies by themselves can prevent risks. The objective of the information is to increase awareness among all stakeholders in order to secure that they are willing and able to reduce risks for workers. At the conference two brochures will be presented. They are designed to provide information and knowledge about specific risks of occupational accidents and occupational diseases which occur frequently during construction work and how they can be prevented. They are directed to all those who are involved in the construction process at different stages and who are subject to SWEAs rules and regulations. New identified risk groups are e.g. students, apprentices, self-employed, and foreign workers temporarily working in Sweden. We also see that work is still being carried out in narrow installation spaces during erection stage of buildings because the people responsible for the drawings do not take notice of the need for sufficient space to do the work. SWEA experienced that it is difficult to reach all the groups concerned with the message about how to avoid injuries and unnecessary musculoskeletal disorders.

  1. Socio-economic status of workers of building construction industry.

    Science.gov (United States)

    Tiwary, Guddi; Gangopadhyay, P K; Biswas, S; Nayak, K; Chatterjee, M K; Chakraborty, D; Mukherjee, S

    2012-05-01

    Informal/unorganised sector covers 92% of the total work force in India. About 50% of the construction industrial workers belonged to informal/unorganised sector. The present study was undertaken to know the socio-economic status of construction worker and availing of the social security measures by this working group. The study covered 150 subjects with an average age of 32 years and mean duration of work was nine years. They were poorly paid with an average income of Rs. 4956/-per month. Though the literacy rate was high (79%) yet most of them were addicted to different habits like drinking alcohol, smoking bidi, tobacco chewing etc., Abusing the family members were noted in (30%) of the cases. Their regular intake of food, usually inadequate in quantity and was mainly consisted of rice, pulses, vegetables. Though most of the subjects (73%) were living in kacha houses yet the latrine facilities were available to 62% of total covered houses. Majority of them were unaware of the different social security schemes/measures. The details have been discussed here.

  2. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    Science.gov (United States)

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  3. Making the link: climate policy and the reform of the UK construction industry

    International Nuclear Information System (INIS)

    Sorrell, Steve

    2003-01-01

    This paper explores the barriers to energy efficiency in the construction of non-domestic buildings in the UK. The source of the barriers is argued to lie in the organisation of the construction industry, including the linear design process, the reliance on cost-based competitive tendering and the incentives placed upon different actors. The consequences include oversizing of equipment, reduced quality, neglect of whole life costs and lack of integrated design. Each of these problems can usefully be interpreted using concepts from the new institutional economics. While the barriers are well known to construction industry specialists, they are relatively neglected in the academic literature on energy policy. Furthermore, conventional policy measures such as building regulations leave these barriers largely untouched. The UK construction industry is currently undergoing a series of reforms which aim to change the relationship between different actors and to achieve improvements in product quality and productivity. While these reforms have the potential to address many of the barriers, the reform agenda makes practically no reference to sustainability. This paper argues that climate policy objectives must be integrated into the reform agenda if the UK is to begin the transition to a low carbon built environment

  4. Oriented strand board: new material for building construction

    International Nuclear Information System (INIS)

    Paridah Md Tahir; Ong, L.L.

    2001-01-01

    The paper will attempt to show the suitability and competitiveness of oriented strand board (OSB) in building construction. One important factor underlining the success of this product is the availability of the wood raw material. Plantation timbers such as rubberwood, paraserianthes falcataria, acacia crassicarpa, A. auriculiformis and A. mangium have been identified as the major source of this industry. We will focus on the domestic market as well as export market especially on the Asia Pacific region

  5. Creation of Polyurethane Injection Materials, Their Pilot-industrial Production, Development and Industrial Introduction of the Technology of Strengthening and Restoring the Operability of Damaged Constructions and Buildings

    Directory of Open Access Journals (Sweden)

    Marukha, V.І.

    2015-01-01

    Full Text Available Polyurethane and foam polyurethane fluid injection materials not conceding foreign analogues and technology technology of restoration and strengthening the operability of concrete and reinforced concrete structures and buildings damaged by cracks were developed. Normative and technical documentation on the injection materials and technological processes was created. The diagnosticrestoring complex for implementing the above technologies was designed, installed and utilized at the construction sites. The equipment is designed and manufactured; the technology of the research and industrial production of «A» and «B» components of injecting polyurethane materials is designed and developed. The pilot-scale batch is manufactured. Technological processes of preparation and application of the «A» and «B» componentsof the injecting materials in industrial conditions are worked out and implemented.

  6. Building Information Modeling for Managing Design and Construction

    DEFF Research Database (Denmark)

    Berard, Ole Bengt

    outcome of construction work. Even though contractors regularly encounter design information problems, these issues are accepted as a condition of doing business and better design information has yet to be defined. Building information modeling has the inherent promise of improving the quality of design...... information for work tasks. * Amount of Information – the number of documents and files, and other media, should be appropriate for the scope. The criteria were identified by empirical studies and theory on information quality in the architectural, engineering and construction (AEC) industry and other fields......Contractors planning and executing construction work encounter many kinds of problems with design information, such as uncoordinated drawings and specification, missing relevant information, and late delivery of design information. Research has shown that missing design information and unintended...

  7. The construction industry has to focus on the Internet

    DEFF Research Database (Denmark)

    Sørensen, Lars Schiøtt; Balogh, Andre

    1997-01-01

    The construction industries needs to follow the developments on the computing scene is discussed. A proposal to separate information relevant for the building sector into three areas are described. Further it is described how this information can be accessed during new technology, especially...... the Internet. An "extra-net" on the Internet combined with an user friendly GUI is described as a possibility....

  8. Critical ICT-Inhibiting Factors on IBS Production Management Processes in the Malaysia Construction Industry

    Science.gov (United States)

    Ern, Peniel Ang Soon; Kasim, Narimah; Hamid, Zuhairi Abd; Chen, Goh Kai

    2017-10-01

    Industrialized Building System (IBS) is one of the approaches that had been introduced as an alternative to conventional building method where it becomes the new strategy of enhancing the sustainable construction in current industries while spearheading a huge advancement of benefits with green constructions into the existing industries. The IBS approach is actively promoted through several strategies and incentives as an alternative to conventional building methods. Extensive uptakes of modern Information Communication Technology (ICT) applications are able to support the different IBS processes for effective production. However, it is argued that ICT uptake at the organisational level is still in its infancy. This raises the importance to identify critical inhibitors which are inhibing the effective uptake of ICT in the IBS production management process. Critical inhibitors to ICT uptake were identified through questionnaire survey with the IBS industry stakeholders. The mean index and critical t-values are generated with the use of the quantitative tool, Statistical Package for Social Sciences (SPSS). The top ten priority ranked inhibitors reflect the Cost, People and Process elements to ICT uptake. High costs in acquiring the technologies and resistance to change were some main concerns from the findings.

  9. Strategies for Promoting Green Building Technologies Adoption in the Construction Industry—An International Study

    Directory of Open Access Journals (Sweden)

    Albert Ping Chuen Chan

    2017-06-01

    Full Text Available Because green building technologies (GBTs adoption is a promising way of ameliorating the sustainability performance of buildings, GBTs are receiving increased interest in the global construction community. The barriers to the adoption of GBTs, such as higher cost and lack of awareness, further indicate that proper strategies need to be devised for promoting the wider adoption of GBTs in buildings development. However, there exist limited empirical studies identifying the strategies for promoting GBTs adoption in the construction industry. This study aims to identify the strategies that are important for promoting GBTs adoption in construction. After a comprehensive literature review to identify strategies for the promotion of GBTs adoption, empirical data were gleaned through a questionnaire survey with 104 green building experts around the world. The analysis results validated the importance of all of the 12 promotion strategies used for the study. Green building experts from different countries and with different backgrounds had significant agreement on the relative importance ranking of the promotion strategies. Furthermore, “financial and further market-based incentives for GBTs adopters”, “availability of better information on cost and benefits of GBTs”, “mandatory governmental policies and regulations”, and “green rating and labeling” were identified as the top four important promotion strategies. The research findings provide a valuable reference to assist practitioners and policy makers in developing practical strategies for promoting GBTs adoption to eventually achieve the sustainable development of buildings. From the perspective of international experts, this study adds to the green building literature by offering empirical evidence of the important strategies for promoting GBTs adoption in the construction industry. Future research will investigate the interrelationships among the promotion strategies and their

  10. Using Modularity to Reduce Complexity of Industrialized Building Systems for Mass Customization

    Directory of Open Access Journals (Sweden)

    Daniela D. Viana

    2017-10-01

    Full Text Available It is widely known that industrialized building systems can positively impact construction projects in terms of efficiency, duration, safety, and quality. Although the use of industrialized building systems can potentially simplify the production process on-site, the complexity of the overall delivery system tends to be high, especially in engineered-to-order (ETO environments, due to factors such as uncertainty related to goals and methods, conflicts between different trades on-site, and interdependence between supply chain members. This paper explores the concept of modularity, which has proven to be useful in different industries as a way of dealing with complex systems. The aim of this paper is to illustrate how modularity can reduce the complexity of ETO industrialized building systems, in companies that adopt a mass customization strategy. This investigation is based on two descriptive case studies on the development of modular structural steel systems for buildings that have adopted innovative beam-to-column connections. The main contribution of this research is demonstrating the need to adopt an integrated product and process-oriented conceptualization of modularity in industrialized building systems. Moreover, the comparison between the two case studies pointed out that the management of tolerances plays a key role in achieving high productivity and short lead times in structural steel building systems. This investigation also illustrates how the adoption of a limited set of modular components can be used to decouple design decisions, and standardize different types of processes.

  11. Construction industry in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    Moavenzadeh, F

    1978-01-01

    This paper provides a review of the construction capability available in the developing countries to meet the demand for shelter. It discusses the role of construction in the process of development and its importance to economic growth. It considers the issue facing the growth of a viable indigenous construction industry in the developing world within the context of the activities involved in the creation of constructed facilities--planning, design, contruction and maintenance; it also examines the environment within which the industry has developed. For each construction activity the paper reviews available capabilities, the various resources needed for the development of an indigenous industry, and some possible means of accommodating these needs.

  12. The Significance of Coordination for Industrialised Building System (IBS) Precast Concrete in Construction Industry

    OpenAIRE

    Fitri Othman Mohd Khairul; Wan Muhammad Wan Mohd Nurdden; Abd Hadi Nurulhudaya; Azman Mohd Azrai

    2017-01-01

    IBS precast concrete is construction system which is meant to improve the conventional construction process. However IBS precast concrete projects are suffering from serious problems such as cost overrun, delays and less quality of the end product. The absence of coordination is perceived as the reason for this issue. The purpose of this paper is to review the significance of coordination for IBS precast concrete in the construction industry. It if found that the fragmentation which occurs in...

  13. USAGE OF CONSTRUCTION-ORIENTED SOFTWARE SCAD FOR ANALYSIS OF WORK OF MACHINE-BUILDING STRUCTURES

    Directory of Open Access Journals (Sweden)

    D. О. Bannikov

    2018-02-01

    Full Text Available Purpose. In the case of analysis of work of the machine-building structures, the direct usage of construction-oriented software developments is impossible, since ideology and methodology for solving various tasks in construction and machine-building are different. Therefore, in the conducting of practical calculations, there is a need for a certain adjustment of the approaches put in the program complexes and their adaptation to the engineering industry. The presentation of the author's experience of the construction-oriented software SCAD usage for Windows for analyzing the work of various machine-building structures, their components and assemblies is the immediate purpose of the publication. Methodology. During a long period of time the author was engaged in analyzing the work of building, mainly thin-walled, steel structures using the Finite Element Method based on the SCAD for Windows software package. At the same time, a considerable number of machine-building structures were considered, including railroad rolling stock units. Most of these tasks grew into a scientific and research problem that needed to be thoroughly researched and analyzed before giving design recommendations. Findings. The publication presents more than a dozen different tasks, typical for the machine-building industry, which the author had to deal with. Static and quasi-static problems, the problem of motion in time, the contact problem, the problem of the cracks deve-lopment, the physical and geometric non-linearity are among them. Accordingly, for each of these problems the main challenges, features and practical techniques developed during the work are presented, as well as the constructed finite element models are presented as an illustration. Originality. The experience of construction-oriented software product usage on the basis of the Finite Element Method for analyzing of the work of machine-building structures is generalized. A number of practical methods and

  14. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong.

    Science.gov (United States)

    Jaillon, L; Poon, C S; Chiang, Y H

    2009-01-01

    As Hong Kong is a compact city with limited available land and high land prices, the construction of high-rise buildings is prevalent. The construction industry produces a significant amount of building waste. In 2005, about 21.5 million tonnes of construction waste were generated, of which 11% was disposed of in landfills and 89% in public filling areas. At the present rate, Hong Kong will run out of both public filling areas and landfill space within the next decade. The government is taking action to tackle the problem, such as by introducing a construction waste landfill charge, and promoting prefabrication to reduce on-site waste generation. This paper reports an ongoing study on the use of prefabrication in buildings and its impact on waste reduction in Hong Kong. A questionnaire survey was administered to experienced professionals, and case studies of recently completed building projects were conducted. The results revealed that construction waste reduction is one of the major benefits when using prefabrication compared with conventional construction. The average wastage reduction level was about 52%. This implies that a wider use of prefabrication could considerably reduce construction waste generation in Hong Kong and alleviate the burdens associated with its management.

  15. Factors and Drivers Effecting the Decision of Using Off-Site Manufacturing (OSM Systems in House Building Industry

    Directory of Open Access Journals (Sweden)

    Hussein Elnaas

    2014-01-01

    Full Text Available Much has been written on Off-site Manufacturing (OSM in construction, particularly regarding the perceived benefits and barriers to implementation. However, there seems to be a wide misunderstanding of the state of OSM associated with the concept of decision by many of those involved in decision making process within the house building industry. This has led to a demand for guidance’s on decision making process for construction project leaders particularly at early project stages. Choosing a construction method for a project will require an optimum decision strategy which involves careful understanding, measurement and evaluation of a number of decision factors that can have the most influence on successful decision action. This paper, therefore, aims to identify the key decision factors to be considered at evaluation stage when choosing to use Off-Site Manufacturing (OSM as a construction strategy in house building projects. This will reveal the key drivers for change in the industry towards the use of OSM in house building.

  16. Industrial Training of Construction Students: Perceptions of Training Organizations in Ghana

    Science.gov (United States)

    Ayarkwa, Joshua; Adinyira, Emmanuel; Osei-Asibey, Dickson

    2012-01-01

    Purpose: The industrial training component in a university's curricula adds tremendous value to a degree programme by enhancing the employable skills of graduates. The purpose of this paper is to assess the perception of organisations that have trained construction students from the Department of Building Technology of the Kwame Nkrumah University…

  17. Applicability of the 'constructional fire prevention for industrial plants' to power plants

    International Nuclear Information System (INIS)

    Hammacher, P.

    1978-01-01

    Power plants, especially nuclear power plants, are considered because of their high value and large construction volume to be among the most important industrial constructions of our time. They have a very exposed position from the point of view of fire prevention because of their constructional and operational concept. The efforts in the Federal Republic of Germany to standardize laws and regulations for fire prevention in industrial plants (industrial construction code, DIN 18230) must be supported if only because they would simplify the licensing procedure. However these regulations cannot be applied in many cases and especially in the main buildings of thermal power plants without restricting or even endangering the function or the safety of such plants. At the present state of the art many parts of the power plant can surely be defined as 'fire safe'. Fire endangered plant components and rooms are protected according to their importance by different measures (constructional measures, fire-fighting equipments, extractors for flue gases and for heat, fire-brigade of the plant). (orig.) [de

  18. 27 CFR 19.271 - Construction of buildings

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Construction of buildings 19.271 Section 19.271 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU... Construction of buildings Buildings in which spirits, denatured spirits, articles, or wines are produced...

  19. Challenges of the expansive use of Building Information Modeling (BIM in construction projects

    Directory of Open Access Journals (Sweden)

    Hannele Kerosuo

    2015-06-01

    Full Text Available Building information modeling (BIM is an emerging modeling technology which challenges existing work procedures and practices in the construction industry. In this article we study the challenges, problems and potential expansions of BIM as a tool in the design, construction and operation of buildings. For this purpose the interfaces between different parties are examined in Finnish construction projects. The methodological approach of the study is cultural-historical activity theory, according to which a new artifact becomes a mediating instrument when the participatory subjects reconfigure the entire activity. The implementation of BIM is now spreading from the design activity to other phases of the construction projects, but its use is still limited in the projects' other three interfaces. BIM is an evolving set of software developed for various purposes which is locally 'combined' to fit the circumstances and capabilities of the stakeholders of the construction process.

  20. Overcoming ICT Barriers in IBS Management Process in Malaysia Construction Industry

    Directory of Open Access Journals (Sweden)

    Soon Ern Peniel Ang

    2017-01-01

    Full Text Available As the result of government’s initiative and future outlook in uprising the awareness towards the implementation of sustainable elements in construction industries, the Industrialized Building System (IBS is one of the approaches that had been introduced as an alternative to conventional building method and produce the new strategy of reducing the waste of materials in construction. The IBS approach is actively promoted through several strategies and incentives as an alternative to conventional building methods. Extensive uptakes of modern Information Communication Technology (ICT applications are able to support the different IBS processes for effective production. However, it is argued that ICT uptake at the organizational level needs to be regularly improved. Thus, this paper fulfills the need to identify the critical barriers to ICT employment and highlighting the ICT drivers in enhancing the IBS management process. Critical barriers and drivers to ICT uptake were identified through questionnaire survey with industry stakeholders and were analyzed using mean index and critical t-value with the use of SPSS software. The critical drivers are top management support and commitment and improving the availability of the technologies. The critical drivers which were identified are significant in ensuring the enhancement of ICT implementation. Hence, any system in place should avoid the highest ranked barriers or seek to alleviate their impact by focusing on the identified drivers in order to enhance implementation of ICT in IBS process management.

  1. Waste Management in Industrial Construction: Investigating Contributions from Industrial Ecology

    OpenAIRE

    Larissa A. R. U. Freitas; Alessandra Magrini

    2017-01-01

    The need for effective construction waste management is growing in importance, due to the increasing generation of construction waste and to its adverse impacts on the environment. However, despite the numerous studies on construction waste management, recovery of construction waste through Industrial Symbiosis and the adoption of other inter-firm practices, comprised within Industrial Ecology field of study, have not been fully explored. The present research aims to investigate Industrial Ec...

  2. Use of EMW radiation in the building industry at defects in buildings

    Directory of Open Access Journals (Sweden)

    Sobotka Jindřich

    2017-01-01

    Full Text Available This paper discusses theory and application of microwave radiation and experimental optimization of microwave radiation to eliminate moisture content in wood elements. It will be appreciated that the rising moisture leaking into the structure, resulting in defects and structures of the buildings themselves. Owing to its properties, microwave radiation has been used in the construction industry in modern times, in particular to dry wet masonry of buildings. Effects of electromagnetic radiation on building structures lead to relatively sharp decreases in moisture content from damp building structures or elements. The influence of electromagnetic radiation on building structures lead to oscillation of water molecules contained in the material, which cause a phase transformation of water into vapour. Consequently, the vapour evaporates from the moist material, thereby drying the element exposed to radiation. The article describes experiments carried out at the Faculty of Civil Engineering of the Faculty of Technology in Brno that demonstrate successful decrease of water content in building materials using microwave radiation. First, the understanding of microwave radiation will be discussed. Following an analysis of research results an optimum intensity of microwave radiation sources as well as the necessary length of the irradiation of microwave radiation have been determined with respect to the particular type of building material and the success rate of elimination of moisture.

  3. Zero carbon homes: Perceptions from the UK construction industry

    International Nuclear Information System (INIS)

    Heffernan, Emma; Pan, Wei; Liang, Xi; Wilde, Pieter de

    2015-01-01

    The take-up of the many voluntary energy efficiency standards which exist in the UK and internationally has been limited. As a result, governments have recognised the need to introduce mandatory schemes through legislation, e.g. from 2016 all new build homes in the UK will be required to achieve zero carbon in regulated energy consumption. However, as 2016 approaches, very few zero carbon homes are being delivered. This paper explores the drivers and barriers for zero carbon homebuilding. The perceptions of the wider construction industry were gathered through a series of semi-structured interviews with professionals involved in commissioning, designing, constructing and regulating housing. The results show that, whilst drivers for zero carbon homebuilding exist, the barriers are currently perceived to be greater than the drivers. The barriers are categorised into five groups: economic, skills and knowledge, industry, legislative and cultural. Mechanisms for policy and industry support for the delivery of zero carbon homes are identified to address these barriers. The research findings highlight the need for a clear and robust policy framework for the forthcoming standard. The Government and industry must prioritise raising public awareness of the need for and benefits of zero carbon homes to help develop market demand. - Highlights: • The strongest drivers were perceived to be in the legislative and economic themes. • More barriers were identified than drivers or potential support mechanisms. • Economic and skills and knowledge barriers were perceived as the most significant. • Uncertainty in zero carbon homes policy is a barrier to zero carbon homebuilding. • Proposed support mechanisms include zero carbon champions and self-build homes

  4. A review of BIM (Building Information Modeling) implementation in Indonesia construction industry

    Science.gov (United States)

    Suryadinata Telaga, Abdi

    2018-05-01

    Construction projects in Indonesia have been growing rapidly in the last three years. Therefore, construction management is very important to ensure completion of construction projects are within schedule and budget. Utilization of building information modeling (BIM) can increase the efficiency of a construction project. However, the implementation of BIM in Indonesia is still not known. This paper is intended to review the implementation of BIM in Indonesia through literature analysis. To find BIM articles in Indonesia, Firstly, searching was limited to English articles published in reputed journals or conferences. However the results were limited, then the search was expanded to the article using Indonesian languages that published in journal and conference. Based on the number of articles, the results showed that BIM research in Indonesia is still in a dearth. Furthermore, BIM study cases were conducted in a limited location and within a small population. Nevertheless, the literature shared the conclusion that BIM can increase project efficiency, but the implementation was hindered by high initial investment cost, inadequate human resources, small demand, and technology resistant. The research contributes to providing a current reported level of BIM implementation in Indonesia. In the future research to study of BIM implementation comprehensively in Indonesia is eminent.

  5. Sustainable industrial estate by managing the building coverage ratio in Cibitung Industrial Town, Indonesia

    Science.gov (United States)

    Budiyanto, T. M. T.; Prajitno, I. S.; Hasibuan, H. S.

    2018-03-01

    The problem faced in the management of the industrial estate is the development of industrial buildings which are not in accordance with the existing environmental regulations, especially the building coverage ratio (BCR). This violation is due to the limitation of industrial land owned, and the tenant’s desire to maximize building area. This research conducted at Cibitung Industrial Town, Indonesia, to assess the compliance of industrial building in complying with environmental regulations, and efforts by industrial estate manager together with industrial communities to meet building regulations. The compliance is shown from the conformity of the tenant’s BCR to the building provisions contained in the regulation within the industrial estate; which is maximum 60% from land owned. And whether the rest of green open space (GOS) area can still be maintained at a minimum 10%. This study found tenant’s building density (BCR) at 24.55% population was 84.77%, and the rest of green open space at 21.56% population was only 2.49%. Excessive building development and expansion by the industrial communities, led to a continued reduction in green open space as a rainwater absorption area. It is resulting the rainfall runoff directly into the environmental drainage system, and causing flooding in the region.

  6. Building constructions: architecture and nature

    Directory of Open Access Journals (Sweden)

    Mayatskaya Irina

    2017-01-01

    Full Text Available The problem of optimization of building structures is considered in architectural bionic modeling on the bionic principle basis. It is possible to get a reliable and durable constructions by studying the structure and the laws of organization of natural objects. Modern architects have created unique buildings using the bionic approach. There are such properties as symmetry, asymmetry, self-similarity and fractality used in the modern architecture. Using the methods of fractal geometry in the design of architectural forms allows finding a variety of constructive solutions.

  7. Factors influencing e-Procurement adoption in the Nigerian building industry

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2016-12-01

    Full Text Available Against the backdrop of increasing adoption of e-Procurement in supply chain management, there is a need for adequate knowledge of the factors that influence the decision by organizations in the building industry to use e-Procurement. This study aims to fill the knowledge gap through investigating the factors influencing e-Procurement adoption based on the data sourced in a questionnaire survey involving 213 organizations in the building industry. The survey was conducted between June and November 2015 in Nigeria. Descriptive statistics, factor and categorical regression analyses were used to analyze the data. The results show that the three most important factors influencing the adoption of e-Procurement amongst the participants, in order of importance, were: the benefits of e-Procurement in enhancing efficiency in project delivery; eliminating geographic barriers and effective communication among project team members. The 29 factors were investigated in seven different dimensions - the benefits of e-Procurement use; level of awareness on e-Procurement in construction; and the availability and cost of e-Procurement applications emerged as the three most significant predictors of e-Procurement adoption in the survey. The study concludes by identifying strategies that should be engaged in increasing the uptake and maximizing the benefits of e-Procurement in the Nigerian building industry.

  8. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  9. A Preliminary Review on Economies of Scale (EOS Towards Industrialized Building System (IBS Manufacturer

    Directory of Open Access Journals (Sweden)

    Tajul Ariffin Syazwana

    2017-01-01

    Full Text Available Industrialized Building System (IBS is a potential technology to improve productivity of construction industry. Controlled production and minimum generation of construction waste are some of the benefits that can be achieved by replacing conventional construction with IBS. In business, IBS is giving a huge opportunity for manufacturer and supplier to expand their business while contributing to construction development. However, bad strategies will put the company in high risk due to higher initial capital for machines and equipment. Therefore, strategic planning for company’s growth, profit maximization, and enhancement of productivity is undeniable to ensure the success of business in construction industry. This preliminary paper is exploring associated factors that affect Economy of Scale (EOS and their relationships in catalyzing the IBS manufacturer especially precast concrete as the scope of study to continue their business in the construction industry. Thus, a framework of EOS is proposed to assist IBS manufacturers to ensure their company’s growth and stability, competitiveness in term of monopoly or an oligopoly, increasing productivity, leading constant returns to scale, and finally increasing the firm’s efficiency. The refined EOS’s conceptual framework is an important turning point to support the development of decision making tools for IBS manufacturer towards their stability and survival in this highly competitive industry.

  10. AP1000 shield building: a constructability challenge

    International Nuclear Information System (INIS)

    Di Giuseppe, Giovanni; Bonanno, Domenico

    2010-01-01

    The AP1000 Shield Building, an enhanced structure which surrounds the containment vessel, consists of standard Reinforced Concrete (RC) and composite Steel and Concrete (SC) construction. In the SC module the surface steel plates, (with attached shear studs and angles) filled with concrete, act as the steel reinforcement in concrete. This is a relatively new design technology that required the appropriate use of structural codes, supplemented with information from applicable tests on similar composite steel and concrete construction. Being a newer design concept, existing codes do not provide explicit guidance on SC construction so a review of literature and test data on composite structures similar to AP1000 shield building was done in order to confirm the technical basis for the design. The SC walls, air inlet structure and roof of the Shield Building will be constructed using modular construction practices and then transported to site and lifted into place. These modules, working also as permanent form-work, will be filled with high strength Self- Consolidating Concrete. (SCC) This paper provides a focused and integrated presentation of the enhanced shield building design methodology, testing, constructability and inspection. (authors)

  11. ACCELERATING CONSTRUCTION INDUSTRY DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Mohan M. Kumaraswamy

    2006-06-01

    Full Text Available The needs for construction industry development are initially viewed from the broader perspectives of imperatives for infrastructure development and national development. All these are clearly more critical in developing countries. A non-exhaustive set of potential drivers and common barriers to construction industry development is identified from previous research. These suggest the usefulness of consolidating a cluster of recent proposals and exercises aiming at (a construction organization development in terms of an over-arching management support system model, as well as improved information and knowledge management; and (b project team development in the context of relationally integrated teams and supply chains, joint risk management and ‘technology and knowledge exchange’ in joint ventures, as well as longer term public private partnerships. These apparently disparate research thrusts are threaded together into a pattern that may inspire, if not feed, specific research and development (R & D agendas for construction industry development in different countries according to their own priorities, constraints and stages of infrastructure and national development.

  12. Possibilities of radiation technique application in machine-building industry of Bulgaria

    International Nuclear Information System (INIS)

    Petrov, A.; Avramov, D.; Kostov, St.

    1979-01-01

    In last ten years, in development of machine-building industry, tendency has been outlined for creation of machines and constructions having minimum weight and elevated reliability from one side due to improvement of design and technology of production and from the other side due to application of materials with improved parameters. Solution of these problems is closely connected with application of the radiation methods. State-of-art of the radiation technology application in the machine-building industry is analyzed and mainly for investigation of wear resistance of friction machineparts. Use of spatial radioactive labelling in investigation of materials and application of radiation methods for optimization of technological processes in metallurgy, foundry and so on is considered. Estimation is give of perspectives of further growth of introduction of radiation methods in Bulgaria [ru

  13. Structuring Requirements in a Multi-Project Environment in the Construction Industry

    DEFF Research Database (Denmark)

    Wörösch, Michael

    2012-01-01

    Being in control of requirements in building projects is vital, since it helps securing the often small profit margins and the reputation of the responsible company. Hence this research aims to introduce requirements management to the construction industry. By means of case study and action...... in this industry, yet, success is here defined as an accomplished and accepted implementation of requirements management processes that are used by the relevant project members in their daily work and where the benefits of implementing requirements management outweighs the cost of invested resources. Furthermore...... it is argued that when running technology development, product development, product platform development, and a portfolio of building projects at the same time the use of requirements management is advantageous and an intelligent way of structuring requirements is needed. This article also demonstrates...

  14. Application of Nanotechnology-Based Thermal Insulation Materials in Building Construction

    Directory of Open Access Journals (Sweden)

    Bozsaky David

    2016-03-01

    Full Text Available Nanotechnology-based materials have previously been used by space research, pharmaceuticals and electronics, but in the last decade several nanotechnology-based thermal insulation materials have appeared in building industry. Nowadays they only feature in a narrow range of practice, but they offer many potential applications. These options are unknown to most architects, who may simply be afraid of these materials owing to the incomplete and often contradictory special literature. Therefore, they are distrustful and prefer to apply the usual and conventional technologies. This article is intended to provide basic information about nanotechnology-based thermal insulation materials for designers. It describes their most important material properties, functional principles, applications, and potential usage options in building construction.

  15. Automatic Construction by Contour Crafting Technology

    Directory of Open Access Journals (Sweden)

    Mohammad Reza Khorramshahi

    2017-07-01

    Full Text Available Contour Crafting is a novel technology in construction industry based on 3D printing that uses robotics to construct free form building structures by repeatedly laying down layers of material such as concrete. It is actually an approach to scale up automatic fabrication from building small industrial parts to constructing buildings. However, there are little information about contour crafting (CC in current use; present paper aims to describe the operational steps of creating a whole building by the machine reviewing relevant literature. Furthermore, it will represent the advantages of CC usage compared to traditional construction methods, as well as its applicability in construction industry.

  16. 9 CFR 108.8 - Construction of buildings.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Construction of buildings. 108.8 Section 108.8 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF... LICENSED ESTABLISHMENTS § 108.8 Construction of buildings. (a) The floors, walls, ceilings, partitions...

  17. Building America Industrialized Housing Partnership (BAIHP)

    Energy Technology Data Exchange (ETDEWEB)

    McIlvaine, Janet; Chandra, Subrato; Barkaszi, Stephen; Beal, David; Chasar, David; Colon, Carlos; Fonorow, Ken; Gordon, Andrew; Hoak, David; Hutchinson, Stephanie; Lubliner, Mike; Martin, Eric; McCluney, Ross; McGinley, Mark; McSorley, Mike; Moyer, Neil; Mullens, Mike; Parker, Danny; Sherwin, John; Vieira, Rob; Wichers, Susan

    2006-06-30

    This final report summarizes the work conducted by the Building America Industrialized Housing Partnership (www.baihp.org) for the period 9/1/99-6/30/06. BAIHP is led by the Florida Solar Energy Center of the University of Central Florida and focuses on factory built housing. In partnership with over 50 factory and site builders, work was performed in two main areas--research and technical assistance. In the research area--through site visits in over 75 problem homes, we discovered the prime causes of moisture problems in some manufactured homes and our industry partners adopted our solutions to nearly eliminate this vexing problem. Through testing conducted in over two dozen housing factories of six factory builders we documented the value of leak free duct design and construction which was embraced by our industry partners and implemented in all the thousands of homes they built. Through laboratory test facilities and measurements in real homes we documented the merits of 'cool roof' technologies and developed an innovative night sky radiative cooling concept currently being tested. We patented an energy efficient condenser fan design, documented energy efficient home retrofit strategies after hurricane damage, developed improved specifications for federal procurement for future temporary housing, compared the Building America benchmark to HERS Index and IECC 2006, developed a toolkit for improving the accuracy and speed of benchmark calculations, monitored the field performance of over a dozen prototype homes and initiated research on the effectiveness of occupancy feedback in reducing household energy use. In the technical assistance area we provided systems engineering analysis, conducted training, testing and commissioning that have resulted in over 128,000 factory built and over 5,000 site built homes which are saving their owners over $17,000,000 annually in energy bills. These include homes built by Palm Harbor Homes, Fleetwood, Southern Energy

  18. Sustainable Construction Risk Perceptions in the Kuwaiti Construction Industry

    Directory of Open Access Journals (Sweden)

    Dalya Ismael

    2018-06-01

    Full Text Available Sustainable construction is fundamentally different than traditional construction because it requires whole systems thinking, early collaboration across stakeholders, and core principles like reducing resource consumption, eliminating toxins, and applying life cycle costing. Construction professionals unfamiliar with this mindset and approach may perceive sustainable construction as risky. One of the global regions in need of more sustainable construction is the Middle Eastern and North African (MENA region. The MENA region is one of the fastest developing in the world. However, it is the slowest one in implementing sustainable construction practices. Kuwait, in particular, contributes 53% more carbon emissions per capita than the United States. To understand how the Kuwaiti construction industry perceives risks associated with more sustainable construction, a survey was developed with 52 risk elements in which 131 industry professionals responded. The results indicate that industry professionals perceive a lack of public awareness as the risk element with the highest probability of occurrence. The risk element with the highest possible negative impact on future projects is designers’ and contractors’ inexperience with sustainable construction. Other risks were found to include a high initial cost for materials and overall project costs. Educational interventions, changes in risk allocation, and behavioral science to reframe upfront costs as long-term savings are offered as possible solutions.

  19. COMPETITIVENESS OF THE INDONESIAN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Agung Budiwibowo

    2009-06-01

    Full Text Available Indonesia’s construction industry is important to the national economy. However, its competitiveness is considered low due to the lack of success of its development strategy and policy. A new approach known as the cluster approach is being used to make strategy and policy in order to develop a stronger more competitive industry . This paper discusses the layout of the Indonesian construction cluster and its competitiveness. The archival analysis research approach was used to identify the construction cluster. The analysis was based on the I/O tables of the years 1995 and 2000, which were published by the Indonesian Central Bureau of Statistics. The results suggest that the Indonesian construction cluster consists of the industries directly involved in construction as the core, with the other related and supporting industries as the balance. The anatomy of the Indonesian construction cluster permits structural changes to happen within it. These changes depend on policies that regulate the cluster’s constituents.

  20. 3D printing cement based ink, and it’s application within the construction industry

    Directory of Open Access Journals (Sweden)

    Jianchao Zhu

    2017-01-01

    Full Text Available The 3D printing technology is the engine key of the third industrial revolution, after introduction of the automation in the eighteenth century and the concept of mass production in early of twentieth century. 3D printing technology now offers the magic solution to balance both the benefits, and overcome the major associated problem with the previous concept which was the need of repetition. The 3D printing technology has two main critical success factors: the printing machine and the printing material (ink. This paper focusses on cementitious-based materials and the ability to utilize the technology in the construction industry. The research took a qualitative approach based on previous literature reviews as well as in-house research results carried out by the authors’ employer Research and Development Center. The paper summarizes the approach towards to an appropriate mix design which can achieve the requirement of the printing process, and overcome the current constraints which are hindering the wide application of 3D print in construction industry. The authors believe that the research topic and result will have great impact on pushing the construction industry forward towards achieving the UAE Government’s strategy and target to achieve twenty-five percent (25% of the buildings in Dubai by the year of 2030 relying on the 3D printing methodology. The research also concluded that even though the technology is adding a great value to the construction industry, it must be remembered that the technology is still in its infancy, and further research is required to achieve even higher strength printing materials that would be workable in multi-story buildings without the need of additional steel reinforcement.

  1. The Insight of Industrialised Building System (IBS By Bumiputera Construction Players

    Directory of Open Access Journals (Sweden)

    Muhammad W. M. N. W.

    2016-01-01

    Full Text Available The term Industrialised Building System (IBS is widely recognised by construction players in Malaysia since its first implementation since 1960s for IBS pilot projects of Pekeliling Flats and Rifle Range Flats. The aim for the implementation is to promote better system in delivering construction end-products which offers efficiency and effectiveness. At the same time, Bumiputera construction players are the majority of parties in construction industry especially in Small and Medium Enterprises (SMEs. Therefore, the purpose of this paper is to identify the perception and awareness of IBS implementation among Bumiputera players. It is found that, Bumiputera construction players have sound knowledge on the IBS and optimistic towards further implementation for future projects. Nonetheless, issues on payment methods and coordination of IBS project delivery are found to be the negative perceptions which are considered as hindrance for Bumiputera construction players’ involvement in IBS project.

  2. An Efficient Heuristic Approach for Irregular Cutting Stock Problem in Ship Building Industry

    Directory of Open Access Journals (Sweden)

    Yan-xin Xu

    2016-01-01

    Full Text Available This paper presents an efficient approach for solving a real two-dimensional irregular cutting stock problem in ship building industry. Cutting stock problem is a common cutting and packing problem that arises in a variety of industrial applications. A modification of selection heuristic Exact Fit is applied in our research. In the case referring to irregular shapes, a placement heuristics is more important to construct a complete solution. A placement heuristic relating to bottom-left-fill is presented. We evaluate the proposed approach using generated instance only with convex shapes in literatures and some instances with nonconvex shapes based on real problem from ship building industry. The results demonstrate that the effectiveness and efficiency of the proposed approach are significantly better than some conventional heuristics.

  3. Rethinking the contractual context for Building Information Modelling (BIM in the Australian built environment industry

    Directory of Open Access Journals (Sweden)

    Ilsa Kuiper

    2013-12-01

    Full Text Available Building Information Modelling (BIM can be defined as a process of generating and managing information of a building or infrastructure during its life cycle. Whilst the 3D visualisation or dimensional functions of BIM are not necessarily new, it is the usage and integration of this information related to project delivery, management and performance analysis that are challenging current construction industry practices.  Industry has called for the development of more collaborative and integrated contractual arrangements to facilitate the use of BIM. Such recommendations appeal to the ideal use of BIM, but also provide a potential opportunity to seek improvement within the construction industry. This paper proposes a procurement approach to BIM to establish the applicable contractual context to address the potential legal risks and commercial considerations, relative to current practices in Australia. It als ooutlines why BIM, with other enabling technologies, will drive the evolution of contract delivery methodologies.

  4. Construction Industry Related Mathematics: Seventh Grade.

    Science.gov (United States)

    Mundell, Scott

    The field tested construction industry-related mathematics unit is intended to familiarize seventh grade students with various facets of the construction industry, including the various occupations available and the mathematical abilities and other skills and training necessary to pursue an occupation in the industry. The final set of activities…

  5. The role of effective communication in the construction Industry: a guide for education and health clients

    Directory of Open Access Journals (Sweden)

    Terry Aulich

    2013-12-01

    Full Text Available The construction industry operates primarily as a system of sub-contracting and purpose built alliances. There is a wide spread of stakeholders involved in conceiving a building project through typical stages such as design, finance, build,  manage, upgrade and, ultimately, replacement and a corresponding need for communication and cooperation. Specialists who can prevent bridges falling down or who build 20 storey buildings are seen as the hard-nosed, action people who have helped bring us into the modern era. However, there are intuitive activities and disciplines which help us to achieve the type of construction achievements that have been the hallmarks of the 19th, 20th and now the 21st centuries. Most of these so called soft disciplines are about how one helps people, often highly skilled, achieve those construction and engineering goals. The key components are consultation and communication. Communication strategies should be based on a thorough understanding of the ways that humans co-operate in joint undertakings, the key principles of social dynamics and learning theory plus the ways in which people deliver, accept and understand words and pictures. The disciplines of organisational and environmental psychology have become a basic fundamental of modern business activities from management and organisational strategy to marketing and customer relations and to the improvement of working, recreational and living environments. However it is rare for a mature industry such as construction to adopt or examine those disciplines for guidance about either strategies or operations. This is despite the fact that the construction industry is almost entirely based on the principle of sub-contracting, business and professional alliances, all of which require understanding of environmental psychology and social dynamics in order to build trust, reputation, teamwork and client satisfaction. There is therefore a major need for communications to be

  6. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  7. Digital building planning - digital construction; Digitale Gebaeudeplanung - digitales Bauen

    Energy Technology Data Exchange (ETDEWEB)

    Friedrichs, K. [Karlsruhe Univ. (T.H.) (Germany). Fakultaet fuer Architektur

    1995-12-31

    In chapter 3 of the anthology about building control the following aspects are discussed: digital building planning and digital construction, which are characterised by an increasing complexity of planning, buildings, construction technology and construction processes. In this respect the digital-technical scenarios, passive and active objects as well as digital construction are described. (BWI) [Deutsch] Kapitel 3 des Sammelbandes ueber Building Control ist den Themen Digitale Gebaeudeplanung und Digitales Bauen gewidmet, die durch die zunehmende Komplexitaet von Planung, Gebaeuden, Bautechnologien und -prozessen bedingt sind. In diesem Zusammenhang werden folgende Themen angesprochen: Digitale technische Szenarien, passive und aktive Objekte sowie digitales Bauen. (BWI)

  8. Expediency of application of explosion-relief constructions to ensure explosion resistance of production buildings

    Directory of Open Access Journals (Sweden)

    Lyapin Anton

    2016-01-01

    Full Text Available The article presents a model of economic evaluation and selection of explosion-relief constructions (ERC, as well as determination of explosion protection efficiency of buildings and structures provided on a stage of construction. It has been shown that definition of economic efficiency of ERС is the evaluation of its application for buildings with remote or automatically controlled production. It has been determined that an important role in design of explosive industrial facilities is played by selection of the economically feasible and effective materials for ERC. When selecting materials it is necessary to consider probability and yield of explosions. Necessity to create the methods allow considering such probability has been revealed.

  9. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  10. Industrialization for sustainable construction?

    NARCIS (Netherlands)

    Egmond - de Wilde De Ligny, van E.L.C.; Barrett, P; Amaratunga, D.; Haigh, R; Keraminiyage, K.; Pathirage, C

    2010-01-01

    Sustainable construction (SuCo), which genesis dates in the early 1990’s, advocates the creation and operation of a quality and healthy built environment based on resource efficiency, life cycle economics and ecological principles. (Kibert, 2003). Currently the Construction Industry does not meet

  11. Perspective sources of industrial minerals for building industry in Novohrad (Southern Slovakia

    Directory of Open Access Journals (Sweden)

    Beláček Boris

    1999-03-01

    Full Text Available Novohrad a region of Southern Slovakia has wealthy industrial history, which was built mostly on local natural raw materials. Some deposits are exhausted, but other are ready to be exploited. Among such industrial minerals are raw materials for building industry. There are industrial minerals for fine and rough ceramics, stones for building and pavement, sand and gravel. The perspective areas are listed on Tab. 1 - 6 and are shown on Fig 1 - 3.

  12. Evolution of building envelope construction techniques in coastal British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    Mattock, C.; Ito, K.; Oshikawa, T. [International Eco-House Inc., (Canada)

    1999-11-01

    Changes in the significant evolutionary development over the past 3 years in building envelope construction for multi storey wood frame housing in British Columbia are described. The urban areas of this region are characterized by a maritime climate which features a high frequency of wind driven rain and little accumulation of snow. Buildings are exposed to high wetting with little drying potential, and moderate temperatures allow for fungal growth even in the winter. While as in the rest of Canada wetting is often due to condensation of moisture contained in indoor air as it leaks out of the building, in British Columbia wind driven rain is a much larger source of moisture. Given this, the following principles of moisture control have been promoted to the B.C. building industry in order of priority: 1) deflection - using parts and elements of the building such as overhangs and flashings that reduce the exposure of the exterior walls to rain, 2) drainage - using envelope assemblies that will then redirect liquid water to the outside, 3) employing drying elements that promote drying through diffusion such as highly permeable wall sheathings, and 4) use of durable materials - using materials that resist rot such as treated lumber, stainless steel fastenings, etc. A variety of air barrier systems other than the conventional sealed polyethylene approach have been employed because of the introduction of recent building code requirements for enhanced airtightness and air barrier durability combined with the use of rain screen construction. This variety of air barrier systems includes: an airtight drywall, an exterior permeable membrane, and an exterior impermeable membrane.

  13. Use of engineered nanomaterials in the construction industry with specific emphasis on paints and their flows in construction and demolition waste in Switzerland.

    Science.gov (United States)

    Hincapié, Ingrid; Caballero-Guzman, Alejandro; Hiltbrunner, David; Nowack, Bernd

    2015-09-01

    One sector where the use of engineered nanomaterials (ENMs) is supposed to offer novel or improved functionalities is the construction industry. During the renovation or demolition of buildings, ENMs contained in former construction materials will enter recycling systems or become construction waste. Currently, information about ENM flows in these processes is insufficient. The potential for the release of ENMs from this waste into the environment is unknown, as are the environmental impacts. To evaluate whether there is currently any nano-relevant construction and demolition waste (C&DW) originating from buildings, we evaluated the sources and flows of ENMs in C&DW and identified their potential exposure pathways. A survey of business representatives of Swiss companies in this sector found that ENMs are mainly used in paints and cement. The most frequently used ENMs in the Swiss housing construction industry are nano-TiO2, nano-SiO2, nano-ZnO, and nano-Ag. Using a bottom-up, semi-quantitative approach, we estimated the flows of ENMs contained in paints along the product's life cycle from buildings to recycling and landfill. The flows of ENMs are determined by their associated flows of building materials. We estimated an annual amount of ENMs used in paints of 14t of TiO2, 12t of SiO2, 5t of ZnO, and 0.2t of Ag. The majority of ENMs contained in paints in Switzerland enter recycling systems (23t/y), a smaller amount is disposed directly in landfills (7t/y), and a tiny fraction of ENM waste is incinerated (0.01t/y). Our results allow a qualitative determination of the potential release of ENMs into technical or environmental compartments, with the highest potential release expected during recycling. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. IMPROVING TRADITIONAL BUILDING REPAIR CONSTRUCTION QUALITY USING HISTORIC BUILDING INFORMATION MODELING CONCEPT

    Directory of Open Access Journals (Sweden)

    T. C. Wu

    2013-07-01

    Full Text Available In addition to the repair construction project following the repair principles contemplated by heritage experts, the construction process should be recorded and measured at any time for monitoring to ensure the quality of repair. The conventional construction record methods mostly depend on the localized shooting of 2D digital images coupled with text and table for illustration to achieve the purpose of monitoring. Such methods cannot fully and comprehensively record the 3D spatial relationships in the real world. Therefore, the construction records of traditional buildings are very important but cannot function due to technical limitations. This study applied the 3D laser scanning technology to establish a 3D point cloud model for the repair construction of historical buildings. It also broke down the detailed components of the 3D point cloud model by using the concept of the historic building information modeling, and established the 3D models of various components and their attribute data in the 3DGIS platform database. In the construction process, according to the time of completion of each stage as developed on the construction project, this study conducted the 3D laser scanning and database establishment for each stage, also applied 3DGIS spatial information and attribute information comparison and analysis to propose the analysis of differences in completion of various stages for improving the traditional building repair construction quality. This method helps to improve the quality of repair construction work of tangible cultural assets of the world. The established 3DGIS platform can be used as a power tool for subsequent management and maintenance.

  15. 29 CFR 779.335 - Sales of building materials for residential or farm building construction.

    Science.gov (United States)

    2010-07-01

    ... materials for residential or farm building construction. Section 3(n) of the Act, as amended, excludes from... 29 Labor 3 2010-07-01 2010-07-01 false Sales of building materials for residential or farm building construction. 779.335 Section 779.335 Labor Regulations Relating to Labor (Continued) WAGE AND...

  16. Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    There is mounting evidence that zero energy can, in many cases, be achieved within typical construction budgets. To ensure that the momentum behind zero energy buildings and other low-energy buildings will continue to grow, this guide assembles recommendations for replicating specific successes of early adopters who have met their energy goals while controlling costs. Contents include: discussion of recommended cost control strategies, which are grouped by project phase (acquisition and delivery, design, and construction) and accompanied by industry examples; recommendations for balancing key decision-making factors; and quick reference tables that can help teams apply strategies to specific projects.

  17. Oscillations and residual displacements of buildings of varying heights and widths, constructed on elastic-plastic base

    Directory of Open Access Journals (Sweden)

    Ter-Martirosyan Zaven

    2016-01-01

    Full Text Available Modern regulations in the field of design and construction of buildings in seismically dangerous areas provide for stability calculation of bases, foundations and underground structures, i.e. calculations for the first group of limited states. At the same time, calculations for the second group of limited states, like deformations (yields, relative difference in yields, as a rule, are not fulfilled. This state of affairs is due to insufficient knowledge of the issues of appearance and development of additional stress and strain in ground arrays during seismic influences, that ultimately leads to residual yields and rolls of foundations of industrial and civil buildings. Essentially, residual displacements depend on the type and intensity of dynamic effects, as well as on the model foundation soils. At the same time, the most important factor is the compulsory registration of collaboration between the subgrade and the structure. Therefore, quantification of additional residual displacements of foundations of industrial buildings and structures under dynamic loads, is an actual problem of the modern earthquake-resistant construction.

  18. Collusion in the Dutch construction industry: an industrial organization perspective

    NARCIS (Netherlands)

    Doree, Andries G.

    2004-01-01

    Several investigations by parliament, cabinet, justice and antitrust authorities have shown a widespread use of cartels and structural bid rigging within the Dutch construction industry. The reputation of the Dutch construction industry has been dented with both the general public and clients. As a

  19. IMPACT OF ECONOMIC AND FINANCIAL CRISIS IN THE CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Cristina PLOSCARU

    2010-01-01

    Full Text Available The current financial and economic crisis has affected many sectors, and also the construction sector. The construction market has been and will be an important source of income for the entire Europe, totaling about 1.650 thousand billion euro, which is more than the GDP of Italy. Building no doubt brings significant percentage in the GDP of any European country, which of course is different from country to country. In Western European countries, the residential market is almost 50% from the construction market, while in Eastern European countries the majority is held by the civil and non-residential constructions. In addition, in the West the medium budget per capita spent on construction is 3-4 times higher than that spent in Eastern countries. But, according to previsions in the coming years the countries that will witness a growth, albeit small, will be the Eastern ones. The paper highlights the impact of the economic and financial crisis in the construction industry on a European and national level, as the sustainable constructions that may represent the sector’s future.

  20. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    Directory of Open Access Journals (Sweden)

    Argaw Tarekegn Gurmu

    2016-09-01

    Full Text Available This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity.

  1. The Building sector commitment to promote the sustainability of construction products: a common European approach for the Environmental Product Performances

    Directory of Open Access Journals (Sweden)

    Caterina Gargari

    2013-05-01

    Full Text Available The industry of construction products plays an important role in Europe in promoting the sustainability of the built environment in a life cycle perspective. Within the framework of the European initiatives for a sustainable competitiveness, manufacturers are interested in promoting a life cycle approach along the building chain. However both, institutions and building operators, in general still have to go a long way on designing and applying a sustainable and competitive industrial policy. This paper aims to describe the European background, the regulatory framework, identifying gaps and the actions to be undertaken to promote a market for sustainable products and sustainable buildings. In particular this paper deals with the assessment and communication of the environmental performance of construction products between the operators in the building chain, as a prerequisite for the sustainability of the built environment, and outlines the strategies to implement a proper evaluation and communication process.

  2. Integrating building information modeling and health and safety for onsite construction.

    Science.gov (United States)

    Ganah, Abdulkadir; John, Godfaurd A

    2015-03-01

    Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

  3. Cost Management Practices and Strategic Perspectives: a study in the construction industry of the State of Paraná

    OpenAIRE

    Almeida, Lauro Brito de; Machado, Esmael Almeida; Panhoca, Luiz

    2012-01-01

    The purpose of this paper is to investigate the cost management practices of building industry companies of Paraná that follow the typology of Porter´s strategies. The sample comprises member companies of the Association of Construction Industries of the State of Paraná (PR-SINDUSCON) operating in the segment of residential buildings. The data were collected by means of questionnaires sent to 317 SINDUSCON members. 69 were returned and 54 used for our research. Exploratory Factorial Analysis ...

  4. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Graham Martin

    2011-11-01

    Full Text Available A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention; gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010 are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers.

  5. MATES in Construction: Impact of a Multimodal, Community-Based Program for Suicide Prevention in the Construction Industry

    Science.gov (United States)

    Gullestrup, Jorgen; Lequertier, Belinda; Martin, Graham

    2011-01-01

    A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention); gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST) training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010) are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers. PMID:22163201

  6. Computer integrated construction at AB building in reprocessing plant

    International Nuclear Information System (INIS)

    Takami, Masahiro; Azuchi, Takehiro; Sekiguchi, Kenji

    1999-01-01

    JNFL (Japan Nuclear Fuel Limited) is now processing with construction of the spent nuclear fuel reprocessing plant at Rokkasho Village in Aomori Prefecture, which is coming near to the busiest period of construction. Now we are trying to complete the civil work of AB Building and KA Building in a very short construction term by applying CIC (Computer Integrated Construction) concept, in spite of its hard construction conditions, such as the massive and complicated building structure, interferences with M and E (Mechanical and Electrical) work, severe winter weather, remote site location, etc. The key technologies of CIC are three-dimensional CAD, information network, and prefabrication and mechanization of site work. (author)

  7. Literature Mapping: Critical Factors in Industrialized BuildingSystem Plastic Formwork Application

    OpenAIRE

    Ghazali, Muhammad Azuan Anif; Bahardin, Nur Fadhilah; Zaidi, Mohd Azian; Baharuddin, Mohd Nurfaisal; Yusof, Mohd Reeza

    2016-01-01

    Industrialised Building System (IBS) in Malaysia has been practiced for decades. The development of its formal practice parallels with the improvement of the built environment in the nation. One of the applications is on formwork. IBS plastic formwork has been promoted by Construction Industry Development Board Malaysia (CIDB) as an alternative to replace the conventional formwork system but the involvement from the public and private sectors in applying the IBS plastic formwork is seen reluc...

  8. QUALITY OF HUMAN RESOURCES IN THE CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Sofronov Daniil Sergeevich

    2012-10-01

    Full Text Available Human resources serve as the basis for development of the national economy, as a whole, and the construction industry, as its constituent part. The problem of inferior labor productivity within the framework of the national economy and its construction industry is considered in the paper. The author has identified the reasons why the productivity of the national economy and its construction industry is low. Low quality manpower is one of the reasons. Analysis of the statistical information has proven that the quality of the manpower in the construction industry is unsatisfactory. The author has also analyzed the relation between the construction industry development pattern and the quality of the manpower. Low manpower quality is a consequence of low personnel training and development expenditures assumed by local construction companies, if compared to the same assumed in the developed economies. Russian businesses do not invest any proceeds into their employees, as any employee may leave the company at any moment, and the employer will lose the investment. Therefore, the performance rate of the Russian construction industry cannot catch up with its western counterpart. The author also provides the analysis of the western personnel development concept. The author also makes his suggestions designated to reverse the unfavourable trend of the construction industry.

  9. Building information modelling (BIM) after ten years: Malaysian construction players’ perception of BIM

    Science.gov (United States)

    Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.

    2017-08-01

    Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.

  10. Singapore's Aarden City Construction and Green Building Development

    Science.gov (United States)

    Xiong, Chenhui; Chen, Jian

    2018-05-01

    The government of Singapore has a high demand for city construction planning always adhere to the implementation of "garden city " theory. Singapore’s government has been following the "sustainable" of Singapore's requirement and fully embodies the "green building" and "environmental protection"concept. To set the ecological construction and protection of water resources as the total target, minimize damage to the environment of economic development, make Singapore a pioneer "green building". In recent years, the Chinese government is promoting green building but harvest little, in this case, for the development of "green building", China can draw lessons from Singapore's experience.

  11. Innovating the Dutch construction industry: How to change?

    NARCIS (Netherlands)

    Prof. J.W.F. Wamelink; Dr. Ir. Frens Pries

    2009-01-01

    The environment of the(Dutch) building industry is increasingly turbulent. There are many cges for the building industry. Innovative tendering, better marketing, openness and transparency are examples of this. A strong reduction in failure costs (estimated at between 10 and 25% of the total costs)

  12. PRIVATE AND PUBLIC ENTERPRISE: FLETCHER CONSTRUCTION AND THE BUILDING OF NEW ZEALAND

    Directory of Open Access Journals (Sweden)

    Astrid Baker

    2002-01-01

    Full Text Available This paper shows how a New Zealand company, Fletcher Construction, created wealth in partnership with the state. The first Labour government was elected in 1935 with a firm commitment to full employment and a broad social security system. Because Labour’s determination to get things done through local industry coincided with James Fletcher’s, and then his son’s, drive for company expansion and profits. Fletchers’ design or construction of roads, wharves, saw-mills, flour mills, pulp mills, paper mills, factories, railway stations, university buildings, hospitals, department stores, office blocks, houses, and ownership and management of stone quarries, brickworks and forests, left a mark in almost every town and city in the country. Many projects required building methods and materials new to New Zealand, the innovative use of traditional materials, large-scale plant, specialist, skilled staff and technical know-how from United States and British construction and engineering firms. In this way Fletcher projects drew together many different suppliers, equipment makers, skilled tradesmen and financiers. As a provider of employment in construction and manufacturing, with easy access to established business and political leaders and a powerful influence on policy making, the company became a potent force in New Zealand’s full employment welfare state.

  13. Technology in industrial buildings; Techniek in bedrijfshallen

    Energy Technology Data Exchange (ETDEWEB)

    Lam, P. ' t (ed.)

    2009-09-15

    This thematic issue dedicates 9 articles to provisions in industrial buildings such as air volume, lighting, sound, climate, heating, purification and ventilation: (1) a CO2 emission free distribution centre of Dutch logistic services provider TNT in Veenendaal; (2) the deployment of sustainable techniques in a new industrial building of contractor Klein Poelhuis; (3) energy saving through the use of supporting ventilators in low inducing supply systems (4) the conditioning of large spaces with gas-fired air conditioning equipment; (5) energy efficient lighting in industrial buildings; (6) the deployment of indirectly fired radiant heating; fire prevention by means of sprinkler systems; (8) draught control with industrial air curtains; and (9) energetically sound cooling of industrial and large buildings [mk]. [Dutch] In dit themanummer zijn 9 artikelen gewijd aan omgevingsvoorzieningen in bedrijfshallen, zoals luchtvolume, verlichting, geluid, klimaat, verwarmen, zuiveren en ventilatie: (1) een CO2-emissievrij distributiecentrum van logistiek dienstverlener TNT in Veenendaal; (2) de toepassing van duurzame technieken in een nieuw bedrijfspand van het installatiebedrijf Klein Poelhuis; (3) energiebesparing door het gebruik van ondersteuningsventilatoren bij laag inducerende toevoersystemen; (4) de klimatisering van grote ruimtes met gasgestookte luchtbehandelingsapparatuur; (5) energiezuinige verlichting in bedrijfshallen; (6) de toepassing van indirect gestookte stralingsverwarming; (7) brandpreventie d.m.v. sprinklersystemen; (8) tochtbestrijding met industriele luchtgordijnen; en (9) energetisch verantwoorde koeling van industriele en grote gebouwen.

  14. The prospects of construction and transport industry

    Science.gov (United States)

    Yaskova, Natalia

    2017-10-01

    The article is focused on a problem of moving the construction industry into the growth and prosperity phase. The method of target orienting developed by the author is aimed at overcoming technological weakness of the construction industry and eliminating disproportions of the capital funds’ structure. Exhaustion of traditional sources of construction industry growth and real property market growth required the research on specific technologies of interphase transformations and their development. It will contribute to implementing the objective laws of the new wave of construction growth, which provides the development of immovable’s structure that is reasonable in terms of strategic priorities of the national economy.

  15. Review on Application of Building Information Modelling in Interior Design Industry

    Directory of Open Access Journals (Sweden)

    Abd Hamid Abu Bakar

    2016-01-01

    Full Text Available Building Information Modeling (BIM is a flourishing device and approach for Architecture, Engineering and Construction (AEC which assist; the planning, design, constructions and operation with particular to commence the designing in several components of the building, a comprehensive understanding of the activities and needed in all aspects. An aspect of activities and needs is the first step to be analysed in the design and it is the responsibility of professionals’ interior designers. To solve the problems, is required to attach with the certain factors such as space planning, specifications fixture, equipment and material, furniture and finishing, lighting fixing and service management. BIM application can provide interior designers such as simulation, analysis, design process and solution with team members. Furthermore, some of the interior designer also using BIM as to organize, documenting data and optimise detail information in solving the problem in the develop process. BIM technology and practices not only to improve the construction and design process development that only the project faster, cost effectively, and prolong but it also helps to increase the capacity of BIM professional by improvise the careers and fields. In the Malaysian context, BIM is still fresh in interior desogn industry.

  16. Sustainability in the UK construction minerals industry

    OpenAIRE

    Mitchell, Clive

    2015-01-01

    Sustainability in the UK construction minerals industry Clive Mitchell, Industrial Minerals Specialist, British Geological Survey, Nottingham, UK Email: Sustainability is not just about environmental protection it also concerns biodiversity, community relations, competence, employment, geodiversity, health and safety, resource efficiency, restoration and stakeholder accountability. The UK construction minerals industry aims to supply essential materials in a sustainabl...

  17. Building Information Modelling: Challenges and Barriers in Implement of BIM for Interior Design Industry in Malaysia

    Science.gov (United States)

    Hamid, A. B. Abd; Taib, M. Z. Mohd; Razak, A. H. N. Abdul; Embi, M. R.

    2018-04-01

    Building Information Modelling (BIM) is an innovative approach that has developed crossways the global in architecture, engineering and construction (AEC) industry. The construction industry of Malaysia has undergone a rapid development and dynamic technology adoption in advance and methods between the players industry and stakeholders. Consequently, limited technologies and devices have not been successful as it should have been. This study will be emphasizing scenarios of challenges and barriers in adopting BIM in interior design industry in Malaysia. The study was emphasizing the challenges and barriers in BIM usage from the designer’s perspective. The data are collected through the questionnaires as to identifying the barriers, knowledge, readiness and awareness and distributed to interior design firms were selected randomly. The finding of this research is to examine the barriers and causes of variables BIM usage for interior design industry in Malaysia. The outcome of this study is to identify the constraint of adoption BIM in interior design industry compare to others players in same industry.

  18. A study on building performance analysis for energy retrofit of existing industrial facilities

    International Nuclear Information System (INIS)

    Gourlis, Georgios; Kovacic, Iva

    2016-01-01

    Highlights: • Thermal simulation of a historical industrial hall with limited data availability. • Considering waste heat from machinery after measuring production fluctuations. • Test of retrofit alternatives for roof and skylights. • Results indicate a significant reduction in heating energy demand up to 52%. • After retrofit naturally ventilated hall can achieve thermal comfort in summer. - Abstract: Due to the strengthening of regulations and codes on building energy performance, as well as with the application of national legislations regarding energy management and efficiency, existing industrial facilities are using thermal refurbishment and renovation as impetus for increasing their overall energy efficiency. This paper analyzes a building envelope refurbishment for a case study of an existing historical industrial facility. Critical parameters affecting energy performance of industrial buildings were identified by reviewing relevant literate. Two retrofit scenarios were developed and dynamic thermal simulation using EnergyPlus was implemented to evaluate the potential for improvement. Thereby the impact of interior loads was considered, determined by measurements conducted on factory machines, occupancy and lighting operation patterns. However, information regarding constructions of the existing facility and installed technical building services is limited. There is also uncertainty in the quantification of natural ventilation air change rate for such buildings. To overcome these limitations a study of various material databases was carried out, in order to assess data for building envelope composition. Input values for missing data were provided based on literature, allowing a fair comparison between refurbishment alternatives. Simulation results showed that the heating demand of the facility could be reduced up to 52%, indicating a significant potential for energy savings. Beyond that, thermal performance against summer overheating also

  19. Barriers of lean construction implementation in the Moroccan construction industry

    Science.gov (United States)

    Bajjou, Mohamed Saad; Chafi, Anas

    2018-04-01

    Improving the production system performance has become a fundamental pillar that must be taken into consideration in the construction industry. Recent developments in the construction sector have led to renewed interest in new techniques of management. Lean Construction is a very effective approach that has gained a high popularity by its ability to eliminate waste and maximize the value for the customer. Although both developed and developing countries have gained large benefits by implementing Lean Construction approach, several experiences showed many barriers that are hindering its implementation especially in developing countries. This paper aims to assess the critical barriers to the successful implementation in the Moroccan construction industry. Based on a literature review, followed by an analysis of data collected from a questionnaire survey which targeted 330 practitioners in the Moroccan construction field, several barriers were identified as key barriers. The findings of this investigation revealed that there are significant barriers such as Lack of knowledge about Lean Construction concepts, Unskilled Human Resources, and insufficient financial resources.

  20. Climate responsive and safe earthquake construction: a community building a school

    Directory of Open Access Journals (Sweden)

    Hari Darshan

    2011-10-01

    Full Text Available This article outlines environment friendly features, climate responsive features and construction features of a prototype school building constructed using green building technology. The school building has other additional features such as earthquake resistant construction, use of local materials and local technology. The construction process not only establishes community ownership, but also facilitates dissemination of the technology to the communities. Schools are effective media for raising awareness, disseminating technology and up-scaling the innovative approach. The approach is cost effective and sustainable for long-term application of green building technology. Furthermore, this paper emphasizes that such construction technology will be instrumental to build culture of safety in communities and reduce disaster risk.

  1. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    Science.gov (United States)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  2. Proceedings of the CIB World Building Congress 2004 : Building for the future. CD-ROM ed.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This conference provided an opportunity to exchange information on recent building and construction research. The main issues were arranged into the following sessions: building techniques; buildings and the environment; building processes; sustainable construction; performance based buildings and regulatory systems; revaluing construction; and, construction in developing countries. The presentations evaluated best practices in construction with reference to a wide range of topics, including heat, air and moisture transfer in buildings, roofing materials, energy conservation, building economics, urban sustainability and the future needs of the construction industry. The conference featured 40 presentations, of which 6 have been indexed separately for inclusion in this database. refs., tabs. ,figs.

  3. Review of Solid Waste Management Practice, Handling and Planning in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Fiza Mohd Noh

    2017-11-01

    Full Text Available The building and construction industry is a major contributor to the source of national economy. However, inappropriate construction waste management lead to various problems such as illegal dumping along the roadsides, demolition waste and disposal of construction at landfills that Malaysia is facing serious shortage of landfill space and recently the issue has become more serious throughout the country, which these have caused major government sources and environmental issue. Solid waste management is one of the environmental issues which always been a concerned to most governments. In urban areas, 46% of the population in the statistics that shows the world population has reached six billion. In 1997, generation of the municipal solid waste was about 0.49 billion tons around the globe with an estimated annual growth rate of 3.2-4.5% in develop nations and 2-3% in developing countries. The characteristics of solid waste generated were changed due to the rapid urbanization and industrialization.

  4. Proposal for the award of an industrial services contract for civil engineering superstructure and internal construction building work

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for civil engineering superstructure and internal construction building work. Following a market survey carried out among 112 firms in fifteen Member States, a call for tenders (IT-2546/ST/Rev.) was sent on 12 April 2001 to eleven consortia, four consisting of four firms, three consisting of three firms and four consisting of two firms, in seven Member States. By the closing date, CERN had received tenders from eight consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE CITRA SUD-EST(FR)-ANTIRUST TECHNOLOGY (GR), the lowest bidder, for an initial period of three years from 1 January 2002 for an amount not exceeding 15 375 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this ...

  5. Green Construction in Building Renovation

    Directory of Open Access Journals (Sweden)

    Ksit Barbara

    2016-06-01

    Full Text Available Modern materials and construction solutions draw more and more attention to ecology and building certification. Among the criteria appearing in revitalization, an important element is bringing plants back into heavily urbanized areas. In its natural form, this is not possible to carry out everywhere, often requiring large amounts of space. Nowadays, however, there are a number of green roofs and green wall systems, allowing “greener” construction without making significant changes in the urban environment.

  6. Critical Factors Affecting the Quality of Industrialized Building System Projects in China

    Directory of Open Access Journals (Sweden)

    Yuanyan Gan

    2017-02-01

    Full Text Available Whilst the benefits of applying an industrialized building system (IBS have been well recognized globally in the construction industry, the application of IBS is particularly limited in developing countries such as China, and quality is considered one of the key issues affecting its application. This paper identifies a number of the key quality factors which present barriers to the promotion of IBS within the context of the Chinese construction industry. These include key factors such as “Inaccurate design of the connecting points between core components”, “Lack of design norms and standards for IBS components”, “Lack of quality criteria for IBS components”, “Lack of production norms and standards for IBS components”, “Lack of quality management system in production process”, and “Lack of technical guidelines for the construction of IBS projects”. The data used for analysis are derived from a comprehensive practical survey. The validity of the data is examined by using a statistical method. The findings from the study provide valuable references for formulating effective measures to mitigate the negative effects of these quality factors on IBS application in China, thereby ensuring that practice of the IBS system can be further developed within the country.

  7. Implementation of safety management systems in Hong Kong construction industry - A safety practitioner's perspective.

    Science.gov (United States)

    Yiu, Nicole S N; Sze, N N; Chan, Daniel W M

    2018-02-01

    In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.

  8. Motivational Factors on Adopting Modular Coordination Concept in Industrialized Building System (IBS

    Directory of Open Access Journals (Sweden)

    Yunus Riduan

    2016-01-01

    Full Text Available Modular coordination (MC is recognized as a tool towards rationalization and industrialization. The implementation of MC concept in the design stage may improve the constructability and construction time. However, the implementation of MC in Industrialized Building System (IBS implementation is still low compare to other developed countries such as the United Kingdom, Sweden and Japan. This paper examined the interrelationship between motivational factors of stakeholders in adopting MC concept using Interpretative Structural Modeling (ISM. Questionnaire survey was engaged in this study to identify significant motivational factors. Then, semi-structure interviews were used to collect qualitative data. ISM was adopted to build relationship between factors and develop an initial model to promote the adoption of MC in IBS construction. Seven (7 significant motivational factors were identified in this research namely 1 ‘stakeholder’s commitment’, 2 ‘reduce site disruption’, 3 ‘increase productivity’, 4 ‘high skilled workers’, 5 ‘site sustainability (environment, economy and social benefits’ 6 ‘standardization’ and 7 ‘enabling ‘open building’ concept’. The result using Matrice d’Impacts Croises Multiplication Applique an Clasment (MICMAC shows that there are three factors can be categorized as Independent / Driving Factors namely ‘stakeholder’s commitment’, ‘standardization’ and ‘enabling “open building” concept’. These factors should be explored in details to enhance the adoption of IBS in Malaysia. The findings provide a very good platform for a further research in formulating an efficient solution to promote MC concept adoption among the stakeholders. This scenario will improve the deliverables of IBS construction and eliminate negative perception in its implementation.

  9. Sustainable Entrepreneurship in the Dutch Construction Industry

    NARCIS (Netherlands)

    Klein Woolthuis, R.J.A.

    2010-01-01

    This article discusses the strategies that sustainable entrepreneurs use to interact with their environment in the Dutch construction industry. The Dutch construction industry is under great pressure to move towards sustainability, and entrepreneurs are believed to be able to play a large role in

  10. Sustainable entrepreneurship in the Dutch construction industry

    NARCIS (Netherlands)

    Klein Woolthuis, R.J.A.

    2010-01-01

    This article discusses the strategies that sustainable entrepreneurs use to interact with their environment in the Dutch construction industry. The Dutch construction industry is under great pressure to move towards sustainability, and entrepreneurs are believed to be able to play a large role in

  11. Enablers of Innovation in the Construction Material Industry

    DEFF Research Database (Denmark)

    Wandahl, Søren; Lassen, Astrid Heidemann; Jacobsen, Alexia

    2014-01-01

    , which creates a strong interdependence between the different supply network partners and can be seen as a hindrance for innovation. Innovation models must embrace such a contemporary business structures, where competition often takes place between supply chains rather than between individual companies......The construction material industry is often acknowledged as slightly more innovative than the overall construction industry and could hence serve as a valuable learning place for how innovation could flourish in the construction industry. Construction is viewed as network or supply chain based......, it was found that different approaches for facilitating this journey exists, based on company characteristics. This paper adds to the body of knowledge on how to succeed with innovation in the construction industry. The increased awareness of an open and cooperative approach to innovation is of value both...

  12. Tectonic thinking in contemporary industrialized architecture

    DEFF Research Database (Denmark)

    Beim, Anne

    2013-01-01

    a creative force in building constructions, structural features and architectural design (construing) – helps to identify and refine technology transfer in contemporary industrialized building construction’. Through various references from the construction industry, business theory and architectural practice......This paper argues for a new critical approach to the ways architectural design strategies are developing. Contemporary construction industry appears to evolve into highly specialized and optimized processes driven by industrialized manufacturing, therefore the role of the architect...... and the understanding of the architectural design process ought to be revised. The paper is based on the following underlying hypothesis: ‘Tectonic thinking – defined as a central attention towards the nature, the properties, and the application of building materials (construction) and how this attention forms...

  13. Automation in building and construction

    NARCIS (Netherlands)

    Gassel, van F.J.M.

    2010-01-01

    De komende 30 jaar zal naar verwachting de werkkracht in Nederland van 11 miljoen naar 10 miljoen mensen afnemen (van Bronswijk, 2010). Willen we dezelfde hoeveelheid taken blijven uitvoeren dan zuIlen we extra hulpmiddelen moeten inzetten. Automation in Building and Construction is het

  14. Relationship between Performance of Quantity Surveying Students in Building Construction and Construction Measurement Courses

    Directory of Open Access Journals (Sweden)

    Olatunde Nathaniel Ayinde

    2018-01-01

    Full Text Available Stakeholders in the educational sector over the century have devoted substantial resources in seeking ways of improving students’ academic performance, yet, the desired improved academic performance has not been achieved. By appraising the relationship between the performance of Quantity Surveying (QS students in Building Construction and Construction Measurement courses; the study identified a major curriculum drafting deficiency in the QS programmes in Nigeria which if addressed could help achieve the much needed improved students’ academic performance. The specific objectives of the study were to determine the performance of QS students in Building construction and construction Measurement Courses; and to determine whether a relationship exist in the performances of QS students in the two subject areas. Purposive sampling technique was used to select Federal Polytechnic Ede, Osun State for the study. Random sampling technique was used to select 241 students who provide data for the study. Close ended questionnaire was used to collect data for the study and data was analyzed using frequency, percentile and correlation analysis. Finding indicates that 43% of the respondents on the average put up good performances in Building Construction Courses while only 19% of the respondents on the average had good grades in Construction Measurement Courses. Results also showed that a significant relationship exist between the performance of QS students in Building Construction and Construction Measurement courses as 83.3% (five out of six pair courses shows significant positive linear correlation. The study recommends that a quick curriculum re-adjustment should be initiated so as to enhance improved academic performance by QS Students especially in Construction Measurement courses.

  15. Wood and Other Materials Used to Construct Nonresidential Buildings - Canada

    Science.gov (United States)

    David B. McKeever; Joe Elling

    2014-01-01

    Low-rise nonresidential building construction is an important market in Canada for lumber, engineered wood products, structural wood panels, and nonstructural wood panels. This report examines wood products consumption in 2012 for construction of selected low-rise nonresidential buildings types that have six or fewer stories. Buildings with more than six stories are...

  16. Handling construction waste of building demolition

    Directory of Open Access Journals (Sweden)

    Vondráčková Terezie

    2018-01-01

    Full Text Available Some building defects lead to their demolition. What about construction and demolition waste? According to the Waste Act 185/2001 Coll. and its amendment 223/2015 Coll., which comes into force on January 1, 2017, the production of waste has to be reduced because, as already stated in the amendment to Act No. 229/2014 Coll., the ban on landfilling of waste will apply from 2024 onwards. The main goals of waste management can thus be considered: Preventing or minimizing waste; Waste handling to be used as a secondary raw material - recycling, composting, combustion and the remaining waste to be dumped. Company AZS 98 s. r. o. was established, among other activities, also for the purpose of recycling construction and demolition waste. It operates 12 recycling centers throughout the Czech Republic and therefore we have selected it for a demonstration of the handling of construction and demolition waste in addressing the defects of the buildings.

  17. Occupational fatalities due to electrocutions in the construction industry.

    Science.gov (United States)

    Janicak, Christopher A

    2008-01-01

    Occupational fatalities due to contact with electricity account for approximately 9% of all deaths in the construction industry and is the fourth leading cause of death in this industry. Differences in the proportions of electrocutions in the construction industry are significantly different from other industries based upon the age of the worker and the source of the electricity. This study found that, in the construction industry, the proportion of occupational fatalities due to contact with electric current is significantly higher for workers in the 16 to 19 years old age group. Contact with overhead power lines occurred more frequently with younger workers, while contact with electric wiring, transformers, and related equipment was found to occur more frequently with older workers. The proportion of fatalities due to this event was also found to account for a significantly greater proportion of fatalities in the construction industry overall. The proportions of electrocution fatalities in the construction industry were found to be significantly higher for younger workers when compared to all other industries. Focusing prevention measures toward younger workers who work near overhead power lines could have a significant impact upon death rates. For older workers, the focus should be on those who work on or near transformers, electrical wiring, and components. Across the construction industry, implementation of effective lockout-tagout programs, and verification of energy isolation, can prevent approximately 125 fatalities per year in the construction industry.

  18. Lifting Wing in Constructing Tall Buildings —Aerodynamic Testing

    Directory of Open Access Journals (Sweden)

    Ian Skelton

    2014-05-01

    Full Text Available This paper builds on previous research by the authors which determined the global state-of-the-art of constructing tall buildings by surveying the most active specialist tall building professionals around the globe. That research identified the effect of wind on tower cranes as a highly ranked, common critical issue in tall building construction. The research reported here presents a design for a “Lifting Wing,” a uniquely designed shroud which potentially allows the lifting of building materials by a tower crane in higher and more unstable wind conditions, thereby reducing delay on the programmed critical path of a tall building. Wind tunnel tests were undertaken to compare the aerodynamic performance of a scale model of a typical “brick-shaped” construction load (replicating a load profile most commonly lifted via a tower crane against the aerodynamic performance of the scale model of the Lifting Wing in a range of wind conditions. The data indicate that the Lifting Wing improves the aerodynamic performance by a factor of up to 50%.

  19. State of the art on construction automation and robotic system in domestic and foreign construction industry

    International Nuclear Information System (INIS)

    Lee, Sung Uk; Seo, Yong Chil; Jung, Seung Ho; Cho, Jai Wan; Choi, Young Soo

    2007-08-01

    In this report, we review the existing concept of construction automation and also survey the state of the art on construction automation and robotic system in domestic and foreign construction industry. On the basis of the result of review and survey, we want to suggest an applicable robotic technology to construction industry and points to be duly considered for activating construction automation. We investigate the state of the art on construction automation and robotic system in domestic and foreign construction industry and also applicable area and direction of domestic construction automation and robotic system. We hope that construction automation and robotic technology, which are improved rapidly nowadays, can contribute to the growth of construction industry

  20. Sustainable Construction Industry in Cambodia: Awareness, Drivers and Barriers

    Directory of Open Access Journals (Sweden)

    Serdar Durdyev

    2018-02-01

    Full Text Available Although sustainability is of utmost importance, anecdotal evidence suggests that the concept is not adequately implemented in many developing countries. This paper investigates industry stakeholders’ awareness of the current state of, factors driving, and barriers hindering the adoption of sustainable construction (SC in Cambodia. Using an empirical questionnaire survey targeting local construction professionals, respondents were invited to rate their level of awareness, knowledge and understanding of SC, as well as to rate the level of importance of 31 drivers and 10 barriers identified from the seminal literature. The data set was subjected to the relative importance index method. The results suggest that the industry-wide adoption of SC practices is poor, which is believed to be due to a lack of awareness and knowledge, and reluctance to adopt new sustainable technologies. Furthermore, more efforts must be put into the selection of more durable materials for the extension of buildings’ lives and to minimize material consumption, as well as to develop energy-efficient buildings with minimal environmental impact and a healthy indoor environment, so that the ability of future generations to meet their own needs will not be compromised. The outcomes of this study have enriched knowledge about the current state of, drivers of, and barriers to sustainable construction in a typical developing economy. Although the outcomes of this study were a short scoping exercise, it has formed a significant base for future SC work within Cambodia.

  1. VARIANT FOR CONSTRUCTION, REPAIR OR RECONSTRUCTION OF BUILDING

    Directory of Open Access Journals (Sweden)

    S. N. Osipov

    2016-01-01

    Full Text Available In the XXI century moral depreciation concept comprises not only deterioration of outside appearance of construction elements in the course of time but accelerated fashion changes in respect of interior design and rapid increase in technical level for residence buildings. For this reason if average rate of building dilapidation in the buildings of series 1–335, 1–335А and 1–464А constructed in Minsk within the period of 1957–1975 and being operated till 2005–2006 has constituted 25–29 % and their moral depreciation has been equal to more than 40 % then rate of the moral depreciation has significantly increased in the XXI century. Such situation requires execution of special investigations. High operating rates of refinancing have led to the necessity for record keeping of initial expenses and repairability levels because selection of building construction, repair or reconstruction variant depends on these parameters. Repairability classification of main elements of residence buildings and premises has been proposed for regulation of such selection procedure. In this case it is recommended to take into account technological effectiveness of repair and technical service, verifiability, accessibility, easy dismountability, substitutability and interchangeability of construction elements and technical devices. The paper presents nomograms that permit to make easier practical calculations on determination of cost-efficient time period for operation of the element prior to its substitution at various refinancing rates and also for comparison of relative initial expenses according to time service. 

  2. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  3. Measures to reduce construction time of high-rise buildings

    Science.gov (United States)

    Kolchedantsev, Leonid; Adamtsevich, Aleksey; Stupakova, Olga; Drozdov, Alexander

    2018-03-01

    The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily - decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the "thermos" method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength.

  4. Building public confidence in the world's nuclear industry

    International Nuclear Information System (INIS)

    Duncan, C.D.

    1996-01-01

    Public confidence in the nuclear industry requires two things, which are trust and understanding. Trust is an emotional response based upon an instinctive reaction. Understanding, on the other hand, is an intellectual response based upon facts. To gain public confidence, both of these levels must be communicated and proactive strategies must be implemented to do this. To achieve this objective will require confidence and courage in communication programs. Each company operating in the nuclear sector must be proactive in building its individual reputation and must not retreat from controversy. Similarly, each industry body must continue the Herculean task of building understanding. The nuclear industry has powerful arguments. ICI, BP or Ford did not achieve their licences to operate by keeping their heads down, they achieved their current market positions by building a positive corporate reputation within their respective industrial contexts over many decades. In order to achieve a similar position for the nuclear industry and the companies, their examples must be followed. If it is continued to 'keep the heads down' in the trenches, public opinion will surely bury within it. (G.K.)

  5. LABOUR SUBCONTRACTING IN THE CONSTRUCTION INDUSTRIES OF DEVELOPING COUNTRIES: AN ASSESSMENT FROM TWO PERSPECTIVES

    Directory of Open Access Journals (Sweden)

    Jill Wells

    2006-06-01

    Full Text Available The practice of employing labour through subcontractors (often referred to as the ‘outsourcing’ of labour is both long established and widespread in the construction industries of developing countries. Recent studies show that it is also increasing in both developing and developed countries. An assessment of the advantages of the practice from the viewpoint of the contractors and of the labour force, suggests it is unlikely to disappear. The paper goes on to explore the implications for the development of the construction industry, as well as for the welfare of the workers and the achievement of broader development objectives. It is concluded that interventions may be needed to deal with some of the negative repercussions, but they have to accept and build on current labour practices.

  6. an appraisal of construction management practice in nigeria

    African Journals Online (AJOL)

    user

    Keywords: Construction Project, Management tools, Project delivery, Construction Industry, Nigeria. 1. ..... developing country” International Journal of Project. Management, Vol. 18, Number 3 ... Construction Industry Perspective”, Building &.

  7. Construction industry accidents in Spain.

    Science.gov (United States)

    Camino López, Miguel A; Ritzel, Dale O; Fontaneda, Ignacio; González Alcantara, Oscar J

    2008-01-01

    This paper analyzed industrial accidents that take place on construction sites and their severity. Eighteen variables were studied. We analyzed the influence of each of these with respect to the severity and fatality of the accident. This descriptive analysis was grounded in 1,630,452 accidents, representing the total number of accidents suffered by workers in the construction sector in Spain over the period 1990-2000. It was shown that age, type of contract, time of accident, length of service in the company, company size, day of the week, and the remainder of the variables under analysis influenced the seriousness of the accident. IMPACT ON INJURY PREVENTION: The results obtained show that different training was needed, depending on the severity of accidents, for different age, length of service in the company, organization of work, and time when workers work. The research provides an insight to the likely causes of construction injuries in Spain. As a result of the analysis, industries and governmental agencies in Spain can start to provide appropriate strategies and training to the construction workers.

  8. The image of the construction industry and its employment ...

    African Journals Online (AJOL)

    Peer reviewed and revised November. 2016. Abstract. As the construction industry does not seem to .... in order to survive or reduce costs, construction companies had ... the Construction Industry Development Board Act with promoting.

  9. Research Progress of Building Materials Used in Construction Land

    Science.gov (United States)

    Niu, Yan

    2018-01-01

    Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.

  10. Procurement of non-incremental sustainable technology innovations : the case of small entrepreneurial firms supplying New Zealand construction & building industry

    NARCIS (Netherlands)

    Dr. Mark P. Mobach; Jeff Seadon; Anne Staal; John Tookey; Gert Walhof

    2014-01-01

    Abstract.Traditionally, the construction industry in New Zealand and in other countries has seen a low productivity and a low track record for successful innovations (Fairweather, 2010). The industry also lags in sustainability (e.g. Nemry, 2008) when seen from a broader or lifecycle perspective.

  11. The role of leaders' paradigm in construction industry change

    NARCIS (Netherlands)

    Pries, Frens; Doree, Andries G.; van der Veen, Bas; van der Veen, Bas; Vrijhoef, Ruben

    2004-01-01

    As in other industries, firms in the construction industry need to become more client- and market-oriented. In the last decade, several initiatives have been taken to change the construction industry in that direction. The changes, however, seem to be slower than other industries and less

  12. IBS SURVEY 2010: DRIVERS, BARRIERS AND CRITICAL SUCCESS FACTORS IN ADOPTING INDUSTRIALISED BUILDING SYSTEM (IBS CONSTRUCTION BY G7 CONTRACTORS IN MALAYSIA

    Directory of Open Access Journals (Sweden)

    KAMARUL ANUAR MOHAMAD KAMAR

    2014-08-01

    Full Text Available The industrialised building system (IBS survey has become an essential tool for ensuring the IBS Roadmap (2003 to 2010 meets its goals and target. As part of the process review survey, it also records the trend achievement of Malaysia in the usage of IBS in the building construction industry. The first and second IBS surveys were published in 2003 and 2005, respectively. Afterward, the IBS Roadmap’s midterm review was conducted. The third and the most recent IBS surveys were conducted in 2008 and 2010, respectively. This paper aims to highlight a part of the IBS survey report in 2010, which has been conducted to measure the drivers, barriers and the critical success factors of G7 contractors in adopting IBS construction. G7 is a Construction Industry Development Board contractor grade that can apply tender without limit. The importance of this paper is that it guides the policy and implementation strategy of IBS by G7 contractors. The survey shows that the acceptance, adoption, and deployment of IBS in the Malaysian construction industry are still low and do not address the persisting problems, such as productivity, dependency on foreign workers and high level of construction wastage.

  13. Assessment Framework of Building Facade in Optimizing Indoor Thermal Comfort of Green Building Index (GBI Certified Office Building

    Directory of Open Access Journals (Sweden)

    Abdul Tharim Asniza Hamimi

    2016-01-01

    Full Text Available During the past decade, the construction industry has seen a new trend in the development of “green” or “sustainable” construction concept around the world with vast support from prominent organization, together with the introduction of sustainable building codes. The establishment of green building certification systems worldwide is seen as one of the most efforts in the emerging green building movement. In order to support the development of the “green” and “sustainable” concept in Malaysia, Green Building Index (GBI was launched by the government on 21 May 2009 that created to promote sustainability in the built environment and raise awareness of environmental issues. However, the construction industry seems to have focused only on findings the “right mechanism” for an environmentally sustainable “final result” in order for the building to be certified as green with the lacking of continuous assessment on the building performance after the certifications. This study is purposely conducted to investigate the performance of various rated Green Building Index (GBI Non-Residential New Construction office buildings and the influence on Indoor Thermal Comfort (ITC of the selected buildings. The aim is to develop an assessment framework for optimum green building architectural façade to be used for office buildings in Malaysia as well as to analyse the occupants’ perception, satisfaction and performance in the selected Green Building Index (GBI rated office indoor environment. This research is still in its infancy; therefore the paper is focused on research aims, research scope and methodology, and expected deliverables for the proposed research.

  14. Specific features of modern multifunctional high-rise building construction

    Science.gov (United States)

    Manukhina, Lyubov; Samosudova, Natal'ja

    2018-03-01

    The article analyzes the main reasons for the development of high-rise building construction the most important of which-is a limitation of the urban areas and, consequently, the high price of land reserved for construction. New engineering and compositional solutions for the creation of new types of buildings are considered - complex technical designs of a large number of storeys completely meet the new requirements for safety and comfort. Some peculiarities of designing high-rise buildings and searching for optimal architectural and planning solutions are revealed since, with external architectural simplicity, high-rise buildings have complex structural and technological and space-planning solutions. We consider the specific features of a high-rise housing in various countries around the world, including Russia, such as the layout of the multi-storey residential buildings, depending on the climatic characteristics of the regions, assessment of the geological risk of the construction site, the choice of parameters and functional purpose of the sections of the territory of high-rise construction, location of the town-planning object for substantiating the overall dimensions of the building, assessment of changes aeration and engineering and hydrological conditions of the site. A special place in the article on the problems of improvement of the territory, the device of courtyards, landscaping, the device of playing and sports grounds. The main conclusion in the article is the following problem - when developing high-rise housing construction, the development of high-rise housing, and an increase in the population density in the territory of large cities of Russia, necessary to create a comfortable and safe level of residents living and not a decrease, but an improvement in the quality of the urban environment.

  15. Procurement of non-incremental sustainable technology innovations : the case of small entrepreneurial firms supplying New Zealand construction & building industry

    NARCIS (Netherlands)

    Staal, Anne; Tookey, John; Seadon, Jeff; Walhof, Gert; Mobach, Mark; Mbachu, Jasper

    2014-01-01

    Traditionally, the construction industry in New Zealand and in other countries has seen a low productivity and a low track record for successful innovations (Fairweather, 2010). The industry also lags in sustainability (e.g. Nemry, 2008) when seen from a broader or lifecycle perspective. This has a

  16. New build: Materials, techniques, skills and innovation

    International Nuclear Information System (INIS)

    Glass, Jacqueline; Dainty, Andrew R.J.; Gibb, Alistair G.F.

    2008-01-01

    The transition to secure, sustainable, low-energy systems will have a significant effect on the way in which we design and construct new buildings. In turn, the new buildings that are constructed will play a critical role in delivering the better performance that would be expected from such a transition. Buildings account for about half of UK carbon dioxide (CO 2 ) production. So it is urgent to ensure that energy is used efficiently in existing buildings and that new building stock is better able to cope with whatever the future holds. Most energy used in buildings goes towards heating, lighting and cooling, but a growing percentage is consumed by domestic appliances, computers and other electrical equipment. Actual energy consumption is the product of a number of factors, including individual behaviours and expectations, the energy efficiency of appliances and the building envelope. This review focuses on the third of these, the building itself, and its design and construction. It discusses the issues faced by the construction industry today, suggesting that major changes are needed relating to materials, techniques, skills and innovation. It moves on to consider future advances to 2050 and beyond, including developments in ICT, novel materials, skills and automation, servitisation (the trend for manufacturers to offer lifetime services rather than simple products), performance measurement and reporting, and resilience. We present a vision of the new build construction industry in 2050 and recommendations for policy makers, industry organisations and construction companies

  17. Utilizing platforms in industrialized construction

    DEFF Research Database (Denmark)

    Bonev, Martin; Wörösch, Michael; Hvam, Lars

    2015-01-01

    platform strategies, this researchhighlights key aspects of adapting platform-based developed theory to industrialised construction.Building projects use different layers of product, process and logistics platforms to form the right cost– value ratio for the target market application, while modelling...

  18. NanoData Landscape Compilation. Construction

    NARCIS (Netherlands)

    Allan, J.E.M.; Bakker, B.J.; Buist, H.E.; Flament, G.; Hartmann, C.; Jawad, I.; Kuijpers, L.T.; Kuittinen, H.; Noyons, E.; Stolwijk, C.C.M.; Olaeta, X.U.; Yegros, A.

    2017-01-01

    This report offers a snapshot of the status of the environment for nanotechnology in the context of construction. The construction industry covers the building, maintaining and repairing of buildings and infrastructures for living, working and transport, including providing materials for those

  19. Evaluation of IT in the Danish Construction Industry

    DEFF Research Database (Denmark)

    Andresen, Jan Lambrecht

    1999-01-01

    How are companies in the Danish construction industry identifying the value achieved by investing in and using information technology (IT)? This question has become more important and is the subject of this paper.The construction industry has characteristics which may have some influence on how...... companies manage (and evaluate) their IT systems and what their requirements are. With the aim of identifying the sophistication of IT evaluation a questionnaire has been sent to 648 Danish companies in the construction industry. Primarily findings in the area of IT strategy and evaluation of IT systems...... are presented in this paper. The findings are compared with other related surveys and some comparisons will be made between these.The analysis of the survey indicates in general that the evaluation of IT is unsophisticated and insufficient in the construction industry. These indications are, however, found...

  20. The supply chain of civil construction industries for support the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana; Moch-Djoko Birmano; Sahala Lumbanraja; Nurlaila

    2013-01-01

    The use of domestic products for electricity infrastructure has been set out in the Ministerial Decree number: 54/M-IND/PER/3/2012, but the infrastructure of nuclear power plants (NPP) construction has not been included. Therefore, the potential of the local industries needs to be mapped it especially supply chain of civil construction industries to estimate the capability of the local component level (DCL) at the nuclear power plant project in Indonesia. NPP is a high-technology so that if NPP will be constructed, it is necessary to involve the national capability as media technology transfer, especially for EPC (Engineering, Procurement and Construction) services. Civil construction (civil part) play role is very large, about 21%. Therefore it is necessary in particular the role of the national civil construction industry to increase the capability of local content. Preparation of Civil construction infrastructure are depend on the supply chain of raw materials. The aim of the research was to map the supply chain of the civil construction industries. Methodology this study is a survey of national industries, literature review, and searching web site. The result study is a map of civil construction industries with raw material supply chain. (author)

  1. Evaluation of IT in the Danish Construction Industry

    DEFF Research Database (Denmark)

    Andresen, Jan Lambrecht

    1999-01-01

    This report presents data on how companies from the Danish construction industry evaluate new IT investments and their existing IT systems.A questionnaire has therefore been sent to 648 Danish companies in the construction industry in order collect and analyse data on the current sophistication...... of IT evaluation practice.The analysis of the survey indicates in general that the evaluation of IT is unsophisticated and insufficient in the Danish construction industry. Several companies in the survey conduct evaluation of some IT investments, but often using informal procedures. However very few companies do...

  2. Research on construction quality and improvement of assembly construction

    Science.gov (United States)

    Cheng, Fei

    2017-11-01

    Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.

  3. Achieving Supply Chain Integration within Construction Industry

    Directory of Open Access Journals (Sweden)

    Peter McDermotti

    2012-11-01

    Full Text Available The main driver behind the adoption of supply chain management (SCM philosophy into the construction industry was the successes within other industry sectors. SCM can be defined as network of different organisations, linked upstream and downstream in a chain, aiming to produce quality and value in the services and products for the end consumers through integrated processes and activities. In order to achieve the optimised level of integration of the whole supply chain, the industry has responded in various forms. This paper will discuss different initiatives by the researchers,construction industry,and the UK government in order to achieve optimal level of supply chain integration. This paper will discuss the concept of aggregation,and also look at other supply chain integration related concepts including client-led supply chain, knowledge about the whole supply chain, effects of procurement on integration of supply chain, etc. The paper will give a brief overview and initial findings of a project undertaken by the authors, and also include examples from the UK construction industry on bundling of the supply and demand.

  4. Analysis of the Key and Difficult Points in the Engineering Construction Technology of the Steel Structures of a Super High-rise Building

    Science.gov (United States)

    Dou, Lijun; Li, Hengxu

    2017-07-01

    In recent years, with the rapid development of the economy of China, the traditional building structure has not been able to meet the current people’s demands and the super high-rise building has become a symbol of a city. In the current period, the research on the super high-rise building in the architectural industry of China is late and the technical blanks exist in some construction difficulties in the super high-rise steel structures. Based on the above, a brief analysis and discussion on the difficult construction technology in the steel structures of a super high-rise building and some measures are presented for reference of the relevant personnel in this paper.

  5. Construction of 'Monju' maintenance and waste disposal building by Shimizu Corporation

    International Nuclear Information System (INIS)

    Baba, Ikuo

    1994-01-01

    The scale of the building, the use, the outline of construction works and the construction processes of the maintenance and waste disposal building among the facilities of the fast breeder prototype reactor 'Monju' are described, and the construction technology which was adopted for ensuring the quality, the construction period and the safety, the state of carrying out quality assurance activity and so on are reported. Moreover, the building works and the electricity works are mentioned, and the examples that were devised on building side for smoothly advancing later electricity side works are introduced, further, as a feature work, the work of erecting the steel framework that constitutes the large space for repair area is explained. The arrangement of buildings, and the scale and the structure of the maintenance and waste disposal building which is a reinforced concrete building, partly steel framework reinforced concrete building, with four stories above ground and four stories underground and the total floor area of 14,354m 2 are described. Liquid waste treatment and washing facilities are in underground, and repair area, solid waste treatment and electric and air conditioning facilities are on above ground floors. (K.I.)

  6. PRIORITISING LEAN CONSTRUCTION BARRIERS IN UGANDA'S CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Henry Mwanaki Alinaitwe

    2009-06-01

    Full Text Available Engaging in lean construction efforts could prove to be highly rewarding for building firms in Uganda. However, lean construction is risky and can be disastrous if not properly managed. Lean production efforts in some other countries have not been successful due to the many barriers to its successful implementation. To enable sound lean construction efforts and to increase the chances of success in eliminating waste, a thorough investigation of the barriers is essential. This study presents 31 barriers and investigates their influence (strength on the success of lean construction initiatives. Structured interviews were carried out with technical managers of building firms to assess their perception of the barriers to lean production based on their experience at their firms. The strongest barrier is the provision of inputs exactly when required. Additionally, the barriers were ranked according to the ease of overcoming each. The easiest barrier to overcome is keeping the required items in the right place. Finally, a graphical aid is provided to enable decision makers to concentrate their efforts on the influential (strong, yet easy to overcome barriers. A lack of buildable designs and a participative management style for the workforce are the most important barriers to successful waste reduction in terms of strength and ease of overcoming. On the other hand, a lack of an organisational culture that supports teamwork, a lack of prefabrication and a lack of knowledgeable and skilled workers are regarded as low in strength, and at the same time difficult to overcome.

  7. Issues confronting women participation in the construction industry

    OpenAIRE

    Aulin, Radhlinah; Jingmond, Monika

    2011-01-01

    This paper raises the issues confronting the minority cohort’s participation in the construction industry. Women in construction are seen as the wrong gender to be around for the construction occupations require not only manual dexterity but physical strength. Currently, the industry is employing less than 10% of the female in the workforce with even lower participation in crafts and trade. This paper discussed about the current women participation in construction focusing on the European Uni...

  8. Reuse of harbour sediments in the Greenlandic construction industry

    DEFF Research Database (Denmark)

    Belmonte, Louise Josefine; Kirkelund, Gunvor Marie; Ottosen, Lisbeth M.

    2010-01-01

    The purpose of this study is to investigate possibilities of using harbour sediments from the Greenlandic harbours as substitutes in the Greenlandic construction industry, mainly for concrete production and road construction. Materials for use in the Greenlandic construction industry are shipped...

  9. Evolution of the constructive adobe system in the Porcelain Industrial Unit of Vista Alegre (1937-1945

    Directory of Open Access Journals (Sweden)

    Alice Ruano

    2010-01-01

    Full Text Available The urban nucleus of the Porcelain Factory of Vista Alegre reveals a special interest in terms of the evolution of the traditional adobe construction in the town of Ílhavo, located in the district of Aveiro. Presenting a structured philosophy of intervention in the territory since its very beginning, it possesses a rich heritage in the field of construction and architecture. The measures planned and implemented in the second phase of Vista Alegre growth reporting its beginning to the ends of the 30's, and along the 40's, confirm it both in the rehabilitation, extension and new constructions in adobe masonry. Those measures were implemented during the structural changes of the Industrial Unit administration that only until this period belonged to the family of its founder. These changes creates one of the focus of innovation in the region, with new construction strategies and solutions in adobe buildings, which will prolonged the period of use of this construction system, noticeable in buildings dated of 1958 in the Vista Alegre and at least in 1970 in the town.

  10. OCCUPATIONAL HEALTH AND SAFETY ISSUES IN VICTORIAN CONSTRUCTION INDUSTRY, AUSTRALIA

    OpenAIRE

    M. Asad, Abdurrahman

    2010-01-01

    The construction industry has one of the highest injury ratios of all Australian industries. Individuals employed on the construction industries find themselves confronted with dangerous and life-threatening work conditions. However, it appears that the trend in Occupational Health and Safety (OHS) performance of construction industry has improved consistently compared with the other industries. The enforcement of OHS law and regulation, and the outcome of authority function to assist and pro...

  11. End-to-end requirements management for multiprojects in the construction industry

    DEFF Research Database (Denmark)

    Wörösch, Michael

    Performance Concrete and insulation materials – is used. By means of action research and interviews of case project staff it has become evident that many elements of formalized requirements management are missing in the case project. To fill those gaps and be able to manage requirements end...... with regards to requirements management. As the literature study gives little new information, a series of interviews are initiated with experts from industry and universities. Those interviews reveal major shortcomings in the way requirements are handled in Danish construction companies today. In order...... to give managers of construction projects a useful and guiding tool for formally managing requirements that is rooted in practice, the “Conceptual requirements management framework”, is created. The framework builds upon the gathered empirical data, obtained by action research, interviews, and available...

  12. Steel slag: a waste industrial by-product as an alternative sustainable green building material in construction applications--an attempt for solid waste management.

    Science.gov (United States)

    Pofale, Arun D; Nadeem, Mohammed

    2012-01-01

    This investigation explores the possibility of utilizing granular slag as an alternative to fine aggregate (natural sand) in construction applications like masonry and plastering. Construction industry utilizes large volume of fine aggregate in all the applications which has resulted into shortage of good quality naturally available fine aggregate. Use of granular slag serves two fold purposes, i.e. waste utilisation as well as alternative eco-friendly green building material for construction. The investigation highlights comparative study of properties with partial and full replacement of fine aggregate (natural sand) by granular slag in cement mortar applications (masonry and plastering). For this purpose, cement mortar mix proportions from 1:3, 1:4, 1:5 & 1:6 by volume were selected for 0, 25, 50, 75 & 100% replacement levels with w/c ratios of 0.60, 0.65, 0.70 & 0.72 respectively. Based on the study results, it could be inferred that replacement of natural sand with granular slag from 25 to 75% increased the packing density of mortar which resulted into reduced w/c ratio, increased strength properties of all mortar mixes. Hence, it could be recommended that the granular slag could be effectively utilized as fine aggregate in masonry and plastering applications in place of conventional cement mortar mixes using natural sand.

  13. Developing a strategic perspective for construction industry of Botswana

    Directory of Open Access Journals (Sweden)

    Joseph Ssegawa

    2013-09-01

    Full Text Available 800x600 The paper discusses the outcome of a study conducted to formulate the strategic perspective of the construction industry in Botswana. The study was sanctioned by the two influential entities namely the Ministry of Infrastructure and BOCCIM Construction Sector. The two entities not only represent the demand and supply side of the construction industry but also represent key professions, trades and interests of the industry. A focus group approach was used based on workshops to formulate the strategic perspective. Workshop participants were drawn from various organisations that play a role in the delivery of construction projects. Individually they also represented the various professions, trades, occupations and interests relating to the construction processes in Botswana. Specific statements for industry’s vision, mission, values and goals were formulated through constructive discussions and debates to describe the future desired state of the construction industry. These are to serve as guiding tools for the industry’s reform process. The paper provides a step by step approach that integrates several scholastic frameworks for developing a strategic perspective for the industry. Normal 0 false false false EN-GB X-NONE X-NONE

  14. Earth construction: traditional building techniques of Bhutan

    Directory of Open Access Journals (Sweden)

    João M. Guedes

    2018-01-01

    Full Text Available NCREP – Consultancy in Rehabilitation of Built Heritage Ltd., surveyed the constructive features of Bhutan's vernacular rammed earth built heritage, as part of a project financed by the World Bank and commissioned by the Division for the Conservation of Heritage Sites (DCHS of the Department of Culture - Ministry of Home and Cultural Affairs of Bhutan. This work, which aimed at better understanding the structural behaviour of this heritage and, based on this information, proposing measures to mitigate its seismic risk, included the study of 18 traditional rammed earth buildings in two villages in the Punakha district. The surveys were conducted house-to-house, based on a DCHS script, and included surveys of artisans responsible for building these constructive typologies, supported by a questionnaire integrated within the project, to collect information on the procedures, rites and practices followed in these constructions. This article focuses only on the first part of the work; it presents the main constructive characteristics assessed from the survey carried out on this built heritage and compiles the results of the surveys of the artisans.

  15. Cost-derived indices for building design and construction ...

    African Journals Online (AJOL)

    Also as multiples of gfi, substructure cost index, sci and roofing cost index, rci could predict componental costs of substructure and roofing for phased development purposes. Keywords: Cost Indices, Building Design, Building Construction Journal of Modeling, Design and Management of Engineering Systems, Vol.

  16. Application of Building Information Modeling (3D and 4D in Construction Sector in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2017-10-01

    Full Text Available Building Information Modeling (BIM is becoming a great known established collaboration process in Architecture, Engineering, and Construction (AEC industry. In various cases in many countries, potential benefits and competitive advantages have been reported. However, despite the potentials and benefits of BIM technologies, it is not applied in the construction sector in Iraq just like many other countries of the world. The purpose of this research is to understand the uses and benefits of BIM for construction projects in Iraq. This purpose has been done by establishing a framework to application of BIM and identifying the benefits of this technology that would convince stakeholders for adopting BIM in the construction sector in Iraq. Through this research, the use of this technology has been clarified by using the proposed framework (application Revit software and linking it with the MS Project and Navisworks Manage software on the case study to identify the important benefits to be the beginning to apply the Building Information Modeling technology in the construction sector in Iraq. The research results indicated that such proposed framework can greatly improve the performance of the current state of project management through improving the project quality, cost saving and time-saving.

  17. Innovation in Management of Primary School Construction: Multi-Purpose Primary School Buildings in Bangladesh. Educational Building Report 18.

    Science.gov (United States)

    Constantinos, Fecadu

    This report deals with school building construction utilizing technology carried out by the Lutheran World Service/Rangpur Dinajpur Rehabilitation Service in Bangladesh. The purpose was to develop an alternative design for primary school constructions. The design, construction, and multipurpose use of the school buildings are described. Appended…

  18. Integrated Design and Approach of Building Maintenance Management in the Built Environment

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2017-12-01

    Full Text Available Building maintenance is such a crucial aspect in the construction industry. The construction industry is characterized as a project-based industry that delivers one of a kind products and services. Thus, building maintenance can guarantee the safety of buildings including human health and property. To some extent, it plays as a guard to supervise the buildings protecting them being suffered collapse and deterioration. The most importantly, preparing for maintenance carried out on buildings is complex and it is related to procurement system dramatically, such as design-and-build, design-build-finance operate, and the private finance initiative and public/private partnerships, all of them need to give much consideration of operational and maintenance needs and costs which are ongoing.. This paper will focus on design and approach of building maintenance management in the construction industry.

  19. Approaching safety in the Swedish and Danish construction industry

    DEFF Research Database (Denmark)

    Grill, Martin; Grytnes, Regine; Törner, Marianne

    2015-01-01

    in accidents rates, especially in construction, and as such offer an opportunity to explore organizational and managerial issues related to safety outcomes. Methods: Semi-structured interviews were carried out with five construction managers and four construction workers in Danish and Swedish construction...... industry. The transcripts were analysed using semantic thematic analysis. Results: Seven safety related themes were distinguished, conveying safety culture differences between Swedish and Danish construction industry concerning: participatory or directive management; challenge or obey; compliance or non...... identifies seven factors perceived by the professionals as related to lower occupational accident rates in the construction industry. Engaging in participatory management, promoting long-term planning and long-term tenures, encouraging cooperation, cautiousness and compliance to rules as well as challenging...

  20. Construction. A Report on the Industry

    Science.gov (United States)

    2004-06-01

    Transportation and Tres Urbano Subway Project, San Juan, Puerto Rico U.S. Corps of Engineers, San Juan, Puerto Rico U.S. Corps of Engineers, Mobile...recently approved a plan to privatize construction of over 6,000 miles of expressways through the use of a build, transfer, and operate options.xl...security standards in Federal facilities, including an aggressive plan to build and renovate embassies and consular offices worldwide.xlv The

  1. To the matter of the educated development of the construction industry of recreational territories

    Directory of Open Access Journals (Sweden)

    Ermakov Alexander

    2017-01-01

    Full Text Available Rational creation of the consumer quality of constructions, which is taking into account some cultural, historical and other, accepted for society development paradigms enters to replace mass sustainable development of the industry of a construction in case of development of the recreational territories around megalopolises, using intellectual systems in a construction, ecological, energy-saving technologies in increase in a consumer evaluation of quality. For the residential development of the recreational territories of cities it is important to provide not only complex conditions of their development, to keep their potential for future generations, providing their social-and-economic development, to consider national and climatic features, but also to use their potential opportunities and traditions of the people inhabiting them, rationally and economically. The educated development of the construction industry is the new term entered into the use of constructors, when the consumer quality of building and structures meets national preferences taking into account traditions and advanced achievements in the use of materials, architectural and project decisions, production technologies and climatic opportunities with the minimum damage to the environment. Its accomplishment assumes enhancement and introduction of local-and-standard regulation with implementation of innovative solutions.

  2. Major factors contributing to the construction waste generation in building projects of Iraq

    Directory of Open Access Journals (Sweden)

    Khaleel Tareq

    2018-01-01

    Full Text Available Due to the economic growth and improvement of the construction industry witnessed by most countries, there has become a crucial need for employing modern possibilities in the construction sector to build taller, longer and deeper structures. However, one aspect that heads forward with the same intensity is the generation of 100 million tons of construction waste every year. This generation has occurred due to several factors with different levels of importance. Hence, this study reveals 15 factors influencing construction waste generation and categorizes them into 3 groups, (materials management on site, (materials handling, transportation and storage and (site management and practices. A questionnaire survey of 100 respondents was distributed among different engineers to assess the construction waste factors. Results showed that damage of materials on site, double handling of materials and incompetent contractor’s technical staff were the most significant factors of each category with Relative Importance Indexes (RII of 0.866, 0.844 and 0.83, respectively. These findings will help the practitioners to reduce construction waste quantities in sites and improve waste management performance factors to control the construction waste problems.

  3. Self-Organized Construction with Continuous Building Material

    DEFF Research Database (Denmark)

    Heinrich, Mary Katherine; Wahby, Mostafa; Divband Soorati, Mohammad

    2016-01-01

    Self-organized construction with continuous, structured building material, as opposed to modular units, offers new challenges to the robot-based construction process and lends the opportunity for increased flexibility in constructed artifact properties, such as shape and deformation. As an example...... investigation, we look at continuous filaments organized into braided structures, within the context of bio-hybrids constructing architectural artifacts. We report the result of an early swarm robot experiment. The robots successfully constructed a braid in a self-organized process. The construction process can...... be extended by using different materials and by embedding sensors during the self-organized construction directly into the braided structure. In future work, we plan to apply dedicated braiding robot hardware and to construct sophisticated 3-d structures with local variability in patterns of filament...

  4. Allergy-related disorders in the construction industry.

    Science.gov (United States)

    Carino, Mauro; Romita, Paolo; Foti, Caterina

    2013-01-01

    Working conditions in the construction industry have improved in many industrialized countries, but heavy physical work with recurrent exposure to chemical agents, dust, and climatic influences still represents considerable risk for construction workers and may affect their health. The aim of this review is to analyze available data of the literature on allergy-related respiratory and skin disorders with emphasis on a preventive appraisal in order to produce statements and recommendations based on research evidence. The most common agents involved in the construction industry as a cause of occupational asthma (OA) in industrialized countries are isocyanates, wood dust, resins, glues, cobalt, and chromium. Allergic contact dermatitis (ACD) is an immunologic cell-mediated response to a sensitizing agent and the most common sensitizing agents associated with construction workers are epoxy resins, thiurams and thiazoles, and chromates. Medical surveillance must consider individual risk factors such as differences in individual susceptibility and sensitization to agents at workplace. Once work-related disorder is confirmed, adequate fitness for work should be assessed for the worker impaired by health condition. A reliable diagnosis of an index case is a sentinel event that may reveal risks for workers with similar exposure, leading to a revised risk assessment at the workplace that should reduce the risk and prevent further cases.

  5. Convergence Among the Submarkets in Australian Regional Building and Construction Sector

    Directory of Open Access Journals (Sweden)

    Junxiao Liu

    2010-12-01

    Full Text Available Studies on market convergence are well considered in the literature. However, the majority of the previous research focused on housing markets and few studies have concentrated on construction markets. Owing to a simultaneously dramatic increase in the construction prices of the sub-markets in the building construction sector in Australia, this paper aims to identify the convergence among these markets, involving house construction market, other-residential building construction market, and non-residential building construction market. To achieve it the Granger causality test and generalized response function depending on the vector error correction model with the quarterly data of Australia’s eight states from 1998 to 2010 will be applied. Based upon the econometric tests, the price diffusion patterns among these construction markets have been identified. Research on the convergences of construction markets not only helps construction firms perform well in business operations and arbitrage activities, but also provides policy makers with useful information for enacting effective construction policies for national perspectives and approaches to infrastructure planning.

  6. Research methods of the parameters of residential buildings construction

    Directory of Open Access Journals (Sweden)

    Grigor’ev Vladimir Aleksandrovich

    Full Text Available The analysis of construction theory and practice shows that rational organizational and technological parameters of the construction of residential buildings should be based on the manifestation in time and space of the most important stages construction with their harmonization. Basing on the experience of normalizing the construction duration, it is advisable to express the complex of residential buildings’ construction processes by their basic stages - preparatory period, underground part, aboveground part, external engineering networks and land improvement. The main indicators of the development and implementation of optimization solutions are: the total duration of the construction, the duration of the preparation period, the duration of the construction of the underground part, the duration of the construction of the aboveground part, the duration of external engineering networks laying, the duration of land improvement. The indicators of the total duration of the construction of residential buildings, the construction the underground and aboveground parts are determined on the basis of the operation of one assembly crane on an object of up to four sections. In case of more sections two (three cranes are considered and the total construction duration is set depending on these conditions. The duration of the construction of multisectional buildings is determined basing on the simultaneous construction of the stages or their combination with a certain time shift. However, this approach requires a significant amount of optimization solutions due to its multivariance. Therefore, in order to reduce the volume of calculations in some cases, for example, when planning the development of districts and neighborhoods, statistical methods can be used for determining the duration of the construction basing on the compilation of optimization solutions. The total duration of the construction and the duration of the main stages are multiple

  7. Building America Industrialized Housing Partnership (BAIHP II)

    Energy Technology Data Exchange (ETDEWEB)

    Abernethy, Bob; Chandra, Subrato; Baden, Steven; Cummings, Jim; Cummings, Jamie; Beal, David; Chasar, David; Colon, Carlos; Dutton, Wanda; Fairey, Philip; Fonorow, Ken; Gil, Camilo; Gordon, Andrew; Hoak, David; Kerr, Ryan; Peeks, Brady; Kosar, Douglas; Hewes, Tom; Kalaghchy, Safvat; Lubliner, Mike; Martin, Eric; McIlvaine, Janet; Moyer, Neil; Liguori, Sabrina; Parker, Danny; Sherwin, John; Stroer, Dennis; Thomas-Rees, Stephanie; Daniel, Danielle; McIlvaine, Janet

    2010-11-30

    This report summarizes the work conducted by the Building America Industrialized Housing Partnership (BAIHP - www.baihp.org) during the final budget period (BP5) of our contract, January 1, 2010 to November 30, 2010. Highlights from the four previous budget periods are included for context. BAIHP is led by the Florida Solar Energy Center (FSEC) of the University of Central Florida. With over 50 Industry Partners including factory and site builders, work in BP5 was performed in six tasks areas: Building America System Research Management, Documentation and Technical Support; System Performance Evaluations; Prototype House Evaluations; Initial Community Scale Evaluations; Project Closeout, Final Review of BA Communities; and Other Research Activities.

  8. A Computer Knowledge Database of accidents at work in the construction industry

    Science.gov (United States)

    Hoła, B.; Szóstak, M.

    2017-10-01

    At least 60,000 fatal accidents at work occur on building sites all over the world each year, which means that on average, every 10 minutes an employee dies during the execution of work. In 2015 on Polish building sites, 5,776 accidents at work happened, of which 69 resulted in the death of an employee. Accidents are an enormous social and economic burden for companies, communities and countries. The vast majority of accidents at work can be prevented by appropriate and effective preventive measures. Therefore, the Computer Knowledge Database (CKD) was formulated for this purpose and it enables data and information on accidents at work in the construction industry to be collected and processed in order to obtain necessary knowledge. This gained knowledge will be the basis to form conclusions of a preventive nature

  9. Aspects of Market Differentiation in the Building Industry

    Directory of Open Access Journals (Sweden)

    Ai-Lin Teo

    2012-11-01

    Full Text Available This paper deals with different aspects of differentiation as a strategy to maintain growth and profitability in a rapidly changing environment. The specific aim of the study was to establish constraints in the use of product differentiation as a survivor technique in the building industry. The study shows that firms in the building industry perceive the structure and operation of different markets in the building industry as substantially different. If firms are to improve their market positions by differentiating their output, they need therefore to adjust the way they operate, their resources and their skills base.The survey result also showed that a substantial proportion of all firms are not prepared to be involved in diversification but elect to operate in one market only, despite the obvious advantages of diversification. It would therefore seem likely that the changes in the way a firm operates and the resources it employs when it moves into new markets are substantial.

  10. Occupational risk of building construction

    International Nuclear Information System (INIS)

    Aneziris, O.N.; Topali, E.; Papazoglou, I.A.

    2012-01-01

    This paper presents the quantification of occupational risk of a building construction project. Risk assessment is based on the Occupational Risk Model (ORCA) developed under the Workgroup Occupational Risk Model project (WORM), in the Netherlands, for quantifying occupational risk. This model assesses occupational risk of a worker, by taking into account his various tasks, activities and their hazards. Risk is evaluated for three types of consequences: recoverable injury, permanent injury and death. The occupational risk model is based on a set of 63 bowties, which assess risk owing to different hazards such as fall from ladder, scaffold, roofs, falling object, struck by moving vehicle, contact by moving parts, etc. ORCA calculates the risk profile of a building construction site, consisting of thirty-eight workers in different job positions, such as operators of excavators, loaders, compaction equipment, workers in excavation and framing phases, etc. All risk profiles of workers have been quantified and jobs have been ranked according to their risk. Workers installing timber formworks have the highest fatality risk (1.57×10 −3 /yr), followed by the workers installing reinforcement (1.52×10 −3 /yr).

  11. The influence of wind speed on airflow and fine particle transport within different building layouts of an industrial city.

    Science.gov (United States)

    Mei, Dan; Wen, Meng; Xu, Xuemei; Zhu, Yuzheng; Xing, Futang

    2018-04-20

    In atmospheric environment, the layout difference of urban buildings has a powerful influence on accelerating or inhibiting the dispersion of particle matters (PM). In industrial cities, buildings of variable heights can obstruct the diffusion of PM from industrial stacks. In this study, PM dispersed within building groups was simulated by Reynolds-averaged Navier-Stokes equations coupled Lagrangian approach. Four typical street building arrangements were used: (a) a low-rise building block with Height/base H/b = 1 (b = 20 m); (b) step-up building layout (H/b = 1, 2, 3, 4); (c) step-down building layout (H/b = 4, 3, 2, 1); (d) high-rise building block (H/b = 5). Profiles of stream functions and turbulence intensity were used to examine the effect of various building layouts on atmospheric airflow. Here, concepts of particle suspension fraction and concentration distribution were used to evaluate the effect of wind speed on fine particle transport. These parameters showed that step-up building layouts accelerated top airflow and diffused more particles into street canyons, likely having adverse effects on resident health. In renewal old industry areas, the step-down building arrangement which can hinder PM dispersion from high-level stacks should be constructed preferentially. High turbulent intensity results in formation of a strong vortex that hinders particles into the street canyons. It is found that an increase in wind speed enhanced particle transport and reduced local particle concentrations, however, it did not affect the relative location of high particle concentration zones, which are related to building height and layout. This study has demonstrated the height variation and layout of urban architecture affect the local concentration distribution of particulate matter (PM) in the atmosphere and for the first time that wind velocity has particular effects on PM transport in various building groups. The findings may have general implications in optimization

  12. Learning from safety in other industries

    NARCIS (Netherlands)

    Terwel, K.C.; Zwaard, W

    2012-01-01

    The Dutch building industry has been shocked by some major structural accidents during the last 10 years with buildings during construction as well as with delivered buildings. Several initiatives were started to improve the safety. In other industries the safety awareness seemed to be more

  13. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Scheib, J.; Pless, S.; Torcellini, P.

    2014-08-01

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy use requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.

  14. THE EVOLUTION OF THE DESIGN AND CONSTRUCTION OF MASONRY BUILDINGS IN BRAZIL

    Directory of Open Access Journals (Sweden)

    Márcio R. S. Corrêa

    2012-12-01

    Full Text Available This paper presents an overview of the use of masonry in Brazil. Some historical remarks are presented showing how masonry was introduced and has been developed in the country. A brief on the Brazilian Universities is also reviewed, showing the extensive efforts made to improve the educational system and to insert Brazil into the international masonry research environment. Current materials are shown, focusing on the use of structural and non-structural masonry. The paper points out the development of Codes, considering the most important regulated characteristics of masonry in order to be used in Brazilian constructions. The building situation is addressed, stressing the large housing demands and how the masonry industry can help to partly solve the problem. Finally, present and future challenges are discussed, showing Brazil’s constructions needs, as an emerging country.

  15. Best Practices in School-to-Careers: The Home Building Industry.

    Science.gov (United States)

    National Employer Leadership Council, Washington, DC.

    This document highlights the school-to-careers (STC) partnerships connecting workplace experiences to classroom learning to prepare students for successful employment in the home building industry. First, the current state of the home building industry is reviewed. Next, the following organizations and employers are profiled: (1) the National…

  16. A profile of wood use in nonresidential building construction

    Science.gov (United States)

    H. N. Spelter; R. G. Anderson

    This report presents estimates of the amounts of lumber, glued-laminated lumber, trusses, plywood, particleboard, hardboard, and wood shingles used in new nonresidential building construction in the United States. Use of wood products is shown for several building types, project sizes, and building components. The estimates are based on a survey of 489 projects under...

  17. IMPROVING THE QUALITY OF INVESTMENT DESIGN IN INDUSTRIAL CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    I. M. Meylanov

    2017-01-01

    Full Text Available Objectives. The development of a set of practical measures in order to improve the quality of investment design in industrial construction.Methods. The basis of research comprises a project management methodology as well as methods for logical and statistical analysis of decisionmaking in investment activities.Results. A mechanism of inclusion of industrial construction objects into the Federal targeted investment programme is revealed. The sequence of the state expert evaluation of investment projects is determined, which optimises the design solutions aimed at minimising their estimated cost if the investment is made with the involvement of the Federal budget. Qualitative and quantitative criteria are systematised for the integrated assessment of the effectiveness of investment fund usage sent to industrial construction objects.Conclusion. The consistent implementation of the state investment policy is aimed at developing the scientific-technological and scientific-industrial potential of industrial construction by providing favourable conditions for effective innovation activity, selecting rational investment strategies and priority projects aimed at solving urgent problems of improving the competitiveness of construction. Successful implementation of the state investment policy in industrial construction largely depends on the effectiveness of investment design, starting from the accuracy of the formulation of the investment plan (idea, in which the interests of all participants in investment activities are concentrated and taken into account, and to the development of an agreed set of actions to complete the project. A unified register covering the data on the cost and results of investment projects is proposed to be created with the purpose of facilitating decision-making in the process of allocation of the Federal budget funds, planning of state capital investments and approval of project documentation for new industrial construction

  18. Field monitoring of column shortenings in a high-rise building during construction.

    Science.gov (United States)

    Choi, Se Woon; Kim, Yousok; Kim, Jong Moon; Park, Hyo Seon

    2013-10-24

    The automatic monitoring of shortenings of vertical members in high-rise buildings under construction is a challenging issue in the high-rise building construction field. In this study, a practical system for monitoring column shortening in a high-rise building under construction is presented. The proposed monitoring system comprises the following components: (1) a wireless sensing system and (2) the corresponding monitoring software. The wireless sensing system comprises the sensors and energy-efficient wireless sensing units (sensor nodes, master nodes, and repeater nodes), which automate the processes for measuring the strains of vertical members and transmitting the measured data to the remote server. The monitoring software enables construction administrators to monitor real-time data collected by the server via an Internet connection. The proposed monitoring system is applied to actual 66-floor and 72-floor high-rise buildings under construction. The system enables automatic and real-time measurements of the shortening of vertical members, which can result in more precise construction.

  19. Waste generated in high-rise buildings construction: a quantification model based on statistical multiple regression.

    Science.gov (United States)

    Parisi Kern, Andrea; Ferreira Dias, Michele; Piva Kulakowski, Marlova; Paulo Gomes, Luciana

    2015-05-01

    Reducing construction waste is becoming a key environmental issue in the construction industry. The quantification of waste generation rates in the construction sector is an invaluable management tool in supporting mitigation actions. However, the quantification of waste can be a difficult process because of the specific characteristics and the wide range of materials used in different construction projects. Large variations are observed in the methods used to predict the amount of waste generated because of the range of variables involved in construction processes and the different contexts in which these methods are employed. This paper proposes a statistical model to determine the amount of waste generated in the construction of high-rise buildings by assessing the influence of design process and production system, often mentioned as the major culprits behind the generation of waste in construction. Multiple regression was used to conduct a case study based on multiple sources of data of eighteen residential buildings. The resulting statistical model produced dependent (i.e. amount of waste generated) and independent variables associated with the design and the production system used. The best regression model obtained from the sample data resulted in an adjusted R(2) value of 0.694, which means that it predicts approximately 69% of the factors involved in the generation of waste in similar constructions. Most independent variables showed a low determination coefficient when assessed in isolation, which emphasizes the importance of assessing their joint influence on the response (dependent) variable. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Mechanisms and sources of radon entry in buildings constructed with modern technologies

    International Nuclear Information System (INIS)

    Zhukovsky, M.V.; Vasilyev, A.V.

    2014-01-01

    To investigate the influence of modern building construction technologies on the accumulation of radon indoor, 20 rooms in buildings constructed using mostly monolithic concrete or aerated concrete blocks have been studied. Dominance of the diffusion mechanism of radon entry in buildings constructed with modern technologies has been established. As a result of computer simulations it was found that the main contribution to the variability of radon concentration was made by changes in the ventilation rate. At a low ventilation rate ( -1 ) radon concentration above 200 Bq m -3 can be observed for residential buildings. There is a need for the regulation of the radium-specific activity in building materials. According to the estimates of this study, the content of 226 Ra in building materials should not exceed the value of 100 Bq kg -1 . (authors)

  1. Determination of sustainable values for the parameters of the construction of residential buildings

    Science.gov (United States)

    Grigoreva, Larisa; Grigoryev, Vladimir

    2018-03-01

    For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.

  2. Research on carbon emission driving factors of China’s provincial construction industry

    Science.gov (United States)

    Shang, Mei; Dong, Rui; Fu, Yujie; Hao, Wentao

    2018-03-01

    As a pillar industry of the national economy, the damage to the environment by construction industry can not be ignored. In the context of low carbon development, identifying the main driving factors for the carbon emission of the provincial construction industry are the key for the local government to formulate the development strategy for construction. In the paper, based on the Kaya factor decomposition method, the carbon intensity of the energy structure, energy intensity and the impact of the construction output on the carbon emission of provincial construction industry are studied, and relevant suggestions for low carbon development of provincial construction industry are proposed. The conclusion of this paper provides a theoretical basis for the early realization of low-carbon development in China’s provincial construction industry.

  3. Corruption and internal fraud in the Turkish construction industry.

    Science.gov (United States)

    Gunduz, Murat; Önder, Oytun

    2013-06-01

    The purpose of this paper is to develop an understanding about the internal fraud and corruption problem in the Turkish construction industry. The reasons behind the internal fraud and corruption problem as well as the types of prevention methods were investigated; and as a result various recommendations were made. To this end, a risk awareness questionnaire was used to understand the behavioral patterns of the construction industry, and to clarify possible proactive and reactive measures against internal fraud and corruption. The type of fraud experienced by Turkish construction companies was also surveyed in the questionnaire. The questionnaire was sent to 89 firms; and depending on the collected data, certain recommendations for construction industry professionals were provided.

  4. Building an industry; building an economy

    International Nuclear Information System (INIS)

    Shrimpton, M.

    2006-01-01

    This presentation provided an outline of oil and gas activity in the province, with a focus on the social and economic benefits provided to the province by the major oil and gas plays of Hibernia, Terra Nova and White Rose. Between 1999 and 2004, oil and gas activity contributed to an 18.4 per cent rise in the gross domestic product (GDP) of Newfoundland. Personal incomes rose by 5.9 per cent, and retail sales achieved an increase of 5.1 per cent. The population of the province has increased by 9000, and the unemployment rate has dropped by 2.3 per cent. Infrastructure additions provided by the oil and gas sector include construction sites; shipyards; a sub-sea fabrication centre; a trans-shipment terminal; a pipeyard, warehouse and operations centre; and a supply base and heliport. The petroleum industry has also contributed significantly to a variety of training and research facilities in the province. Oil revenues continue to accrue to the Newfoundland government, and economic diversification has improved in the region. Despite these contributions, the petroleum industry is often seen as transient and tangential to the economy. The industry is viewed as a revenue source, and its activities are seen as being of short duration. It was suggested that a wider recognition of the range, scope and scale of benefits provided by the industry are needed to address public misperceptions. Efforts must be made by the province to help the industry grow, and a wider recognition of diversification and sustainability must be achieved. refs., tabs., figs

  5. Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project

    Science.gov (United States)

    Zhou, Yong; Huang, You Zhen

    2018-06-01

    This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.

  6. Supply chain bottlenecks in the South African construction industry: Qualitative insights

    Directory of Open Access Journals (Sweden)

    Poobalan Pillay

    2017-07-01

    Full Text Available Background: The construction industry in South Africa has a lot of potential but its performance is still restricted by numerous internal and external challenges. Unless these challenges are identified and understood better, further growth of this industry is likely to be hindered, which has negative economic implications for the South African economy. Objectives: This study investigated supply chain bottlenecks faced by the construction industry in South Africa. It also discussed solutions for addressing the identified bottlenecks in order to facilitate the continued development of supply chain management in the construction industry. Method: The study used a qualitative approach in which in-depth interviews were held with purposively selected senior managers drawn from the construction industry in South Africa. Content analysis using ATLAS.ti software was employed to identify the themes from the collected data. Findings: The findings of the study showed that supply chain management in the construction industry in South Africa is constrained by five major bottlenecks: skills and qualifications, procurement practices and systems, supply chain integration, supply chain relationships and the structure of the construction industry. Recommendations for addressing each of these five challenges were put forward. Conclusion: The study concludes that both awareness and application of supply chain management in the construction industry in South Africa remains inhibited, which creates opportunities for further improvements in this area to realise the full potential of the industry.

  7. Problem of dynamic impacts upon NPP buildings and constructions

    International Nuclear Information System (INIS)

    Kosterev, A.E.

    1998-01-01

    Activities of IAEA member-states dealing with the problems of taking into account external natural and technogenic impacts (earthquakes, cyclones, hurricanes, aircraft crushes, air shock waves) when designing NPP buildings and constructions important for nuclear and radiation safety are briefly discussed. It is concluded that development of IAEA general recommendations for taking into account specific dynamic impacts will improve noticeably safety of NPPs being in operation both in Russia and all over the World as a result of reconstruction of safety-important buildings and constructions

  8. Opportunities and barriers to straw construction

    DEFF Research Database (Denmark)

    White, Caroline Meyer; Howard, Thomas J.; Lenau, Torben Anker

    2012-01-01

    During the past decades the building industry has had a great focus on energy consumption during the use phase of a building, but currently a more holistic view of the entire lifecycle of a building is starting to emerge. With this follows a greater interest in which building materials and techni......During the past decades the building industry has had a great focus on energy consumption during the use phase of a building, but currently a more holistic view of the entire lifecycle of a building is starting to emerge. With this follows a greater interest in which building materials...... and techniques of construction are considered. At the same time the request for a living environment free from toxins and allergenic substances, providing the basis for stress-free living and working conditions is increasingly demanded by clients for newly built homes. Since straw built houses supply a possible...... construction, and a series of qualitative interviews with a variety of stakeholders from previous straw build housing projects, results were gathered to find the most influential motives, barriers and considerations for straw build housing construction. Based on this empirical data, a design guide has been...

  9. New instruments for dynamic building-construction : Computer as partner in construction

    NARCIS (Netherlands)

    van Rees, R.

    2007-01-01

    For dynamic processes to become possible in Building-Construction, ICT support is needed. Data access and data exchange needs to be ubiquitous. Existing research often only targets elaborate international standards (that don't really get off the ground because of international differences) or it

  10. A comparative study of Japan and United States nuclear enterprise: Industry structure and construction experience

    International Nuclear Information System (INIS)

    Hinman, G.W.; Lowinger, T.C.

    1987-01-01

    Both Japan and the United States have undertaken major programs to utilize nuclear power for central station electricity generation. Over the past 20 years, the Japanese have developed their own construction and government regulatory institutions and now have an essentially independent domestic nuclear power program. Nuclear construction and government oversight of nuclear power have developed somewhat differently in Japan and the United States, reflecting to some extent the two countries' different business and social cultures. In the United States the vendor and utility industries are much more fragmented than those in Japan, and construction projects are carried out on a more competitive basis. The Japanese industry operates through a few well-established consortia while the U.S. industry does not. Relations among the national government, the vendors, and the electric utilities tend to be cooperative in Japan while they are more adversarial in the Untied States. This paper discusses these topics in a framework of a comparative study of the countries' nuclear industries. Whether because of the factors mentioned above or for other reasons the success of nuclear power in Japan and the United States has differed dramatically in recent years. This paper compares the performance of the nuclear enterprise in these two countries in terms of the physical attributes of the plants themselves, the labor required to build them, and the construction times required. It also discusses the relationship between initial estimates of costs and schedules and actual results achieved. On all counts, recent Japanese performance has been better than in the United States

  11. Partnering in the Construction Industry

    DEFF Research Database (Denmark)

    Ditlev Bohnstedt, Kristian; Bejder, Erik; Haugbølle, Kim

    2013-01-01

    Huge efforts have been made in order to stimulate thorough improvements in the construction industry in terms of value for money, feasibility and consistency when facilitating a partnering approach. Despite this attention there is limited documentation on the development of research trends, thus...

  12. Delivering construction projects using innovative building technologies

    CSIR Research Space (South Africa)

    Ampofo-Anti, Naalamkai

    2017-07-01

    Full Text Available . Figure 1: IBT delivery flowchart Proceedings 11th Built Environment Conference 6 th August – 8 th August 2017 Delivering construction projects using innovative building technologies Durban, South Africa 5. REFERENCES Ampofo-Anti, N...

  13. The American nuclear construction craftsmen: Will we be ready to build again?

    International Nuclear Information System (INIS)

    Bravo, R.

    1990-01-01

    The present state of nuclear plant maintenance and operations support reflects sexual, ethnic, and radical integration; continued educational advances; some computer literacy; mixed trades in maintenance; detailed training for maintenance and operations work in the operating plant; plant safety awareness and respect; need for top-quality, take the time to do it right mentality; and planning. With no new nuclear construction, what will be the specific talents, focus, and contributions that the craftsmen can be expected to bring to the project? To be prepared to successfully manage the next generation of nuclear plant construction, the industry must be acutely aware of the needs of the labor pool. To be aware of the needs requires an intimate knowledge of the present state of the craft talent, the changed expectations of their contributions, and the effects of new technologies, materials, methods, and individuals that will be used to design and build

  14. Fatal falls and PFAS use in the construction industry: Findings from the NIOSH FACE reports.

    Science.gov (United States)

    Dong, Xiuwen Sue; Largay, Julie A; Choi, Sang D; Wang, Xuanwen; Cain, Chris Trahan; Romano, Nancy

    2017-05-01

    This study analyzed the Construction FACE Database (CFD), a quantitative database developed from reports of the Fatality Assessment and Control Evaluation (FACE) program conducted by the National Institute for Occupational Safety and Health (NIOSH). The CFD contains detailed data on 768 fatalities in the construction industry reported by NIOSH and individual states from 1982 through June 30, 2015. The results show that falls accounted for 42% (325) of the 768 fatalities included in the CFD. Personal fall arrest systems (PFAS) were not available to more than half of the fall decedents (54%); nearly one in four fall decedents (23%) had access to PFAS, but were not using it at the time of the fall. Lack of access to PFAS was particularly high among residential building contractors as well as roofing, siding, and sheet metal industry sectors (∼70%). Although the findings may not represent the entire construction industry today, they do provide strong evidence in favor of fall protection requirements by the Occupational Safety and Health Administration (OSHA). In addition to stronger enforcement, educating employers and workers about the importance and effectiveness of fall protection is crucial for compliance and fall prevention. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Research on the Development Prospect of Assembled Passive Building Based on Green Development Concept

    Science.gov (United States)

    Lixin, Zhang; Ju, Ma; Baohui, He

    2018-02-01

    In recent years, the vigorous development of the construction industry has brought about serious problems of environmental pollution and resource consumption. In order to reduce the negative impact that the construction industry has on the natural environment,this paper, from the perspective of environmental protection, studies the pollution and high consumption problems existing in the production and use of traditional construction industry, compares and analyzes the green and energy-saving advantages in the construction and using phase of assembled passive building, and at the same time, combined with our country is vigorously promoting the assembled passive building and the green development, concluded that the assembled passive building is the new development direction of China’s construction industry.

  16. Determination of sustainable values for the parameters of the construction of residential buildings

    Directory of Open Access Journals (Sweden)

    Grigoreva Larisa

    2018-01-01

    Full Text Available For the formation of programs for housing construction and planning of capital investments, when developing the strategic planning companies by construction companies, the norms or calculated indicators of the duration of the construction of high-rise residential buildings and multifunctional complexes are mandatory. Determination of stable values of the parameters for the high-rise construction residential buildings provides an opportunity to establish a reasonable duration of construction at the planning and design stages of residential complexes, taking into account the influence of market conditions factors. The concept of the formation of enlarged models for the high-rise construction residential buildings is based on a real mapping in time and space of the most significant redistribution with their organizational and technological interconnection - the preparatory period, the underground part, the above-ground part, external engineering networks, landscaping. The total duration of the construction of a residential building, depending on the duration of each redistribution and the degree of their overlapping, can be determined by one of the proposed four options. At the same time, a unified approach to determining the overall duration of construction on the basis of the provisions of a streamlined construction organization with the testing of results on the example of high-rise residential buildings of the typical I-155B series was developed, and the coefficients for combining the work and the main redevelopment of the building were determined.

  17. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  18. Message exchange in the building industry

    NARCIS (Netherlands)

    Vries, de B.; Somers, L.J.A.M.

    1995-01-01

    A process model is described for exchanging information in the building industry. In this model participants send and receive messages. On receipt of a message an activity is executed if all required information is available. Otherwise a message will be sent to another participant to obtain the

  19. ISO in the Construction and Manufacturing Companies: A Case Study from the Construction Industry of Hyderabad and Karachi, Pakistan

    OpenAIRE

    Nafees Ahmed Memon; Qazi Muhammad Moinuddin Abro; Zubair Ahmed Memon

    2011-01-01

    Construction industry plays very important role in development of any country. The development of construction industry depends to a larger extent on quality of construction productions and projects. Quality of construction productions and projects is linked with the implementation of QMS (Quality Management System) in construction organizations. ISO certification is one of the QMS which has been adopted in manufacturing and construction industry at the global level. The constr...

  20. Innovation in the Danish Construction Industry

    DEFF Research Database (Denmark)

    Bonke, Sten; Bang, Henrik; Clausen, Lennie

    This report is concerned with public policy instruments, how they are used and to which degree they enhance innovativeness in the Danish construction sector.The report is written as a Danish response to the first of three thematic questions raised in CIB Task Group 35 on innovation systems...... in construction. The three themes are:A. Which current public policy instruments facilitate innovation in construction?B. What is the role of knowledge brokers in the innovation process?C. How does the client-industry interface influence innovation?...

  1. A Report on the Industry: Construction

    National Research Council Canada - National Science Library

    Conway, Hugh; Dunn, Colin; Khalil, Gary

    2004-01-01

    .... national Gross Domestic Product (GDP). A healthy construction industry creates jobs, fuels the economy, enhances the quality of life for Americans, and is an essential component of national security...

  2. Key Practice for Green Building Management In Malaysia

    OpenAIRE

    Aghili Nasim; Bin Mohammed Abdul Hakim; Sheau-Ting Low

    2016-01-01

    This paper identifies the management practices for green building management in Malaysia. A set of practices was ascertained from the reviewed of various established Green Building Standard in the world. Green building practices are significant role in attaining sustainability particularly in the construction industry. Green building is constructed for minimizing impacts to environment as well as decreasing building effects on occupants. To achieve the goals of green buildings, set of managem...

  3. Effect of Unprofessional Supervision on Durability of Buildings.

    Science.gov (United States)

    Yahaghi, Javad

    2018-02-01

    The durability of buildings which depends on the nature of the supervisory system used in their construction is an important feature of the construction industry. This article tries to draw the readers' attention to the effect of untrained and unprofessional building supervisors and their unethical performance on the durability of buildings.

  4. Time to propagate green building construction concept for saving precious resources sustainable development

    International Nuclear Information System (INIS)

    Ali, Z.

    2005-01-01

    At present, we are constructing houses and buildings without giving any consideration to consumption of resources at the time of construction and consumption of resources for the use of such houses or buildings. ; Although green is our color but we are doing little about green building. Time has now come to propagate Green Building Construction Concepts in order to save our precious resources. The paper deals with dire need of awareness about conservation of water, conservation of energy, use of local materials, use of natural materials, etc. (author)

  5. Asbestos Standard for the Construction Industry

    National Research Council Canada - National Science Library

    1995-01-01

    .... In the construction industry, asbestos is found in installed products such as shingles, floor tiles, cement pipe and sheet, roofing felts, insulation, ceiling tiles, fire-resistant drywall, and acoustical products...

  6. Accelerating nano-technological innovation in the Danish construction industry

    DEFF Research Database (Denmark)

    Koch, Christian; Stissing Jensen, Jens

    2007-01-01

    . The institutional features of the system are furthermore poorly equipped at identifying potentials within high-tech areas. In order to exploit the potentials of nano-technology it is thus argued that an alternative TIS needs to be established. Initiatives should identify and support "incubation rooms" or marked......  By viewing the construction industry as a technological innovation system (TIS) this paper discusses possible initiatives to accelerate nanotechnological innovations. The point of departure is a recent report on the application of nano-technology in the Danish construction industry, which...... concludes that opportunities are generally poorly appreciated by the industry and research communities alike. It is found that the construction industry is characterised by low-tech trajectories where dedicated innovation networks are often too fragile for innovations to stabilize and diffuse...

  7. Optimization and control methods in industrial engineering and construction

    CERN Document Server

    Wang, Xiangyu

    2014-01-01

    This book presents recent advances in optimization and control methods with applications to industrial engineering and construction management. It consists of 15 chapters authored by recognized experts in a variety of fields including control and operation research, industrial engineering, and project management. Topics include numerical methods in unconstrained optimization, robust optimal control problems, set splitting problems, optimum confidence interval analysis, a monitoring networks optimization survey, distributed fault detection, nonferrous industrial optimization approaches, neural networks in traffic flows, economic scheduling of CCHP systems, a project scheduling optimization survey, lean and agile construction project management, practical construction projects in Hong Kong, dynamic project management, production control in PC4P, and target contracts optimization.   The book offers a valuable reference work for scientists, engineers, researchers and practitioners in industrial engineering and c...

  8. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  9. Towards the carbon fibers in the building industry

    Directory of Open Access Journals (Sweden)

    Miravete, A.

    2001-12-01

    Full Text Available There are two mainstreams in the building industry in the area of carbon fibers: rehabilitation and use as building material. The using of carbon fiber as a building material is taking place slower than as rehab system due to the very low cost of traditional building materials, the limitations of composite structure manufacturing processes and the conservative building regulations concerning materials in all the industrialized countries. However, these three issues are being solved in a very efficient way, as we will see along the coming paragraphs of this paper. This paper is split in two parts, first the carbon fiber as a material system, its typologies, manufacturing processes and industrial presentations will be described. Second, rehab and building applications will be analyzed.

    En el área de fibra de carbono en la construcción hay actualmente dos líneas de trabajo: reparaciones e implantación en obra: La implantación en la obra civil está avanzando más despacio que la utilización en reparaciones debido al bajo coste de los materiales tradicionales, a la limitación de procesos de fabricación de estructuras de materiales compuestos y al conservadurismo de las normativas de edificación y obra civil en todos los países industrializados. Sin embargo, los tres asuntos mencionados están siendo abordados con eficiencia, como se explicará más adelante. En el presente artículo, se va a describir, el primer lugar, la fibra de carbono, sus tipos, procesos de fabricación y presentaciones industriales. En segundo lugar se tratarán las aplicaciones en la construcción, haciendo énfasis en las reparaciones y en la implantación en obra civil.

  10. ENABLING KNOWLEDGE FLOW: RETAINING GRADUATE WOMEN IN THE SINGAPORE CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Florence Yean Yng Ling

    2008-12-01

    Full Text Available As extensive resources are expanded in transferring knowledge from universities to undergraduates, it is important for them to enter the workforce upon graduation to enable the knowledge to flow to the industry. The aim of this study is to investigate the extent to which knowledge flow is disrupted because graduate women are not entering the Singapore construction industry to ensure its sustainable growth. This study used a structured questionnaire, with data collected from 116 construction-trained graduate women via postal survey. Results show that 58% of them chose not to enter or are considering leaving the construction industry. The disruption in knowledge flow is due to better prospects in other industries (pull factor and poor job conditions within the construction industry (push factor. To retain graduate women in the construction industry, it is recommended that employers: introduce flexible work schedule; allow graduate women to work from home; and give them the same opportunities as their male counterparts.

  11. R and D levers for an abatement of industrial CO{sub 2} emissions by 2030 in the building industry sector; Leviers R and D pour une reduction des emissions industrielles de CO{sub 2} a l'echeance de 2030 dans le secteur du batiment

    Energy Technology Data Exchange (ETDEWEB)

    Capmas, A.

    2006-03-15

    This document presents in a series of transparencies: the regulatory framework of CO{sub 2} emissions (Kyoto protocol, CO{sub 2} trading market), the CO{sub 2} emissions in the cement industry and the actions implemented to limit them (energy conservation, fuel substitution, recycling of by-products from other industries), the life cycle analysis in the building industry (construction stage and entire life of the building), the energy saving potentialities in existing buildings (double-glazing, mineral wools, space heating system, thermal inertia, insulation etc..), the use of the thermal inertia of concrete and cement to save energy, and some examples of implementation in municipal buildings. (J.S.)

  12. Construction of high-rise building with underground parking in Moscow

    Directory of Open Access Journals (Sweden)

    Ilyichev Vyacheslav

    2018-01-01

    Full Text Available Paper presents results of scientific support to construction of unique residential building 108 m high with one storey underground part under high-rise section and 3-storey underground parking connected by underground passage. On-site soils included anthropogenic soil, clayey soils soft-stiff, saturated sands of varied grain coarseness. Design of retaining structure and support system for high-rise part excavation was developed. It suggested installation of steel pipes and struts. Construction of adjacent 3-storey underground parking by “Moscow method” is described in the paper. This method involves implementation of retaining wall consisted of prefabricated panels, truss structures (used as struts and reinforced concrete slabs. Also design and construction technology is provided for foundations consisted of bored piles 800 MM in diameter joined by slab with base widening diameter of 1500 MM. Experiment results of static and dynamic load testing (ELDY method are considered. Geotechnical monitoring data of adjacent building and utility systems settlement caused by construction of presented high-rise building were compared to numerical modelling results, predicted and permissible values.

  13. Construction of high-rise building with underground parking in Moscow

    Science.gov (United States)

    Ilyichev, Vyacheslav; Nikiforova, Nadezhda; Konnov, Artem

    2018-03-01

    Paper presents results of scientific support to construction of unique residential building 108 m high with one storey underground part under high-rise section and 3-storey underground parking connected by underground passage. On-site soils included anthropogenic soil, clayey soils soft-stiff, saturated sands of varied grain coarseness. Design of retaining structure and support system for high-rise part excavation was developed. It suggested installation of steel pipes and struts. Construction of adjacent 3-storey underground parking by "Moscow method" is described in the paper. This method involves implementation of retaining wall consisted of prefabricated panels, truss structures (used as struts) and reinforced concrete slabs. Also design and construction technology is provided for foundations consisted of bored piles 800 MM in diameter joined by slab with base widening diameter of 1500 MM. Experiment results of static and dynamic load testing (ELDY method) are considered. Geotechnical monitoring data of adjacent building and utility systems settlement caused by construction of presented high-rise building were compared to numerical modelling results, predicted and permissible values.

  14. Development of Occupational Safety and Health Requirement Management System (OSHREMS Software Using Adobe Dreamweaver CS5 for Building Construction Project

    Directory of Open Access Journals (Sweden)

    Abas Nor Haslinda

    2017-01-01

    Full Text Available The construction industry sector is considered as being risky with frequent and high accident rate. According to Social Security Organization (SOCSO, the construction accidents has arisen from time to time. Construction Industry Development Board (CIDB has developed the Safety and Health Assessment System in Construction (SHASSIC for evaluating the performance of a contractor in construction project by setting out the safety and health management and practices, however the requirement checklist provided is not comprehensive. Therefore, this study aims to develop a software system for facilitating OSH in building construction project, namely OSH requirements management system (OSHREMS, using Adobe Dreamweaver CS5 and Sublime Text as PHP editor. The results from a preliminary study which was conducted through interviews showed that, the respondents were only implementing the basic requirements that comply with legislations, with the absence of appropriate and specific guideline in ensuring occupational safety and health (OSH at the workplace. The tool will be benefits for contractors and other parties to effectively manage the OSH requirements for their projects based on project details.

  15. Dynamic Analysis of an Office Building due to Vibration from Road Construction Activities

    Science.gov (United States)

    Chik, T. N. T.; Kamil, M. R. H.; Yusoff, N. A.; Ibrahim, M. H. W.

    2018-04-01

    Construction activities are widely known as one of the predominant sources of man-made vibrations that able to create nuisance towards any adjacent building, and this includes the road construction operations. Few studies conclude the construction-induced vibration may be harmful directly and indirectly towards the neighbouring building. This lead to the awareness of study the building vibration response of concrete masonry load bearing system and its vibrational performance towards the road construction activities. This study will simulate multi-storey office building of Sekolah Menengah Kebangsaan (SMK) Bandar Enstek at Negeri Sembilan by using finite element vibration analyses. The excitation of transient loads from ground borne vibrations which triggered by the road construction activities are modelled into the building. The vibration response was recorded during in-situ ambient vibration test by using Laser Doppler Vibrometer (LDV), which specifically performed on four different locations. The finite element simulation process was developed in the commercial FEA software ABAQUS. Then, the experimental data was processed and evaluated in MATLAB ModalV to assess the vibration criteria of the floor in building. As a result, the vibration level of floor in building is fall under VC-E curve which was under the maximum permissible level for office building (VC-ISO). The vibration level on floor is acceptable within the limit that have been referred.

  16. Environmental impacts of adobe as a building material: The north cyprus traditional building case

    Directory of Open Access Journals (Sweden)

    A.P. Olukoya Obafemi

    2016-06-01

    Summarily, this paper posits that the successful fusion of traditional building materials such as Adobe and modern design construct will not only give birth to earth conscious building, but will also be energy efficient. Moreover, it will be a substitute building material the building industry can adopt at as a contributing solution to the omniscient global warming malady.

  17. Pattern of accidents in building construction sites in Obio Akpor ...

    African Journals Online (AJOL)

    Background: Building construction workers are engaged in a dangerous job, exposing them ... The leading cause building site accidents include falls from unsafe working ... Data collected in Excel spread sheet were analyzed and presented in ...

  18. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  19. Study on the Quality Management of Building Electricity Engineering Construction in the Whole Process

    Science.gov (United States)

    Qin, Minwu

    2018-05-01

    With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.

  20. Energy plus standard in buildings constructed by housing associations?

    International Nuclear Information System (INIS)

    Stutterecker, Werner; Blümel, Ernst

    2012-01-01

    In order to achieve national, European and international energy goals, energy efficiency strategies in the building sector have to be implemented. The passive house standard and low energy standards are already successfully established in single dwelling houses. These high performance standards are starting to penetrate into the sector of housing associations. A case study about an apartment building constructed by a housing association is presented here. It describes the monitoring concept and the results of the 1st year of monitoring. Depending on the definition of the zero energy building standard (extent of loads included in the balancing), the building could be classified as an energy plus building or as a building, which uses more energy, than is supplied by on-site generation. If the building's total energy use (including user specific loads) is defined as load, only 34.5% of these loads were provided by the net energy output of the PV system. If only the heating energy demand is defined as load, the PV system even yielded a surplus of 45.6% of the energy load. -- Highlights: ► Energy monitoring of an apartment building constructed by a housing association. ► Planned as a Passive House with a semi-central ventilation system with decentralized heat pump technology. ► Total end energy demand of the building was 43 kWh/(m² a). ► Total net energy generation by the PV system was 15 kWh/(m² a). ► Apartment no. 1: 52% of the energy demand were used for heating and ventilation.

  1. In Middle Europe, heating of an industrial building only with solar energy. First solar house industrial building with passive house standard in this size; In Mitteleuropa ein Industriegebaeude nur mit der Sonne heizen. Erstes Sonnenhaus Industriegebaeude mit Passivhaus-Standard in dieser Groesse

    Energy Technology Data Exchange (ETDEWEB)

    Huemer, Herbert [Xolar Renewable Energy Group HQ, Eberstalzell (Austria)

    2010-07-01

    Since 2008, Xolar Renewable Energy Group (Eberstalzell, Austria) combines the companies Sunmaster and Xolar in the most modern solar house in Europe with passive house standard. The contribution under consideration reports on the development of an industrial building which is heated entirely by solar energy and meets the standards of passive houses. All working places in the building should be sunny and free of draught. It does not use electrically powered heat pumps or refrigerators. All energy values calculated by simulation were achieved or partly exceeded. The savings in annual operating costs compared to conventional construction in factory buildings is approximately 192,000 Euro per year.

  2. From Disparity to Harmonisation of Construction Industry Payment Legislation in Australia: A Proposal for a Dual Process of Adjudication based upon Size of Progress Payment Claim

    OpenAIRE

    Coggins, Jeremy

    2011-01-01

    Since the introduction of the Building and Construction Industry Security of Payment Act into New South Wales in 1999, construction industry payment legislation has progressively been enacted on a jurisdiction-by-jurisdiction basis throughout Australia. Of the eight Australian Acts, two distinct legislative models can be discerned – what have been termed the ‘East Coast’ and ‘West Coast’ models. This article compares the two models with respect to their payment s...

  3. Facilitating Industrial Placement in the Construction Engineering Curriculum

    DEFF Research Database (Denmark)

    Wandahl, Søren; Ussing, Lene Faber

    2016-01-01

    outset in the hypothesis that external effectiveness (industry readiness) is better in those modes of education that, at least in part, are based on the world of work itself, and several sources highlight the necessity of strong links between engineering education and industry. Hence, it becomes central......There is often a claim that there is a disconnection between theory and practice, which raises questions on student’s readiness for employment and the extent that higher education responds effectively to the evolving needs of the construction industry. Industrial placements schemes can facilitate...... student learning from construction practice whereby students can reflect on their learning experience at the university. The interplay between traditional engineering curriculum and the context-based learning is important for securing the right skills and competencies among the graduates. This paper takes...

  4. Using Ecotech Architecture as an Effective Tool for Sustainability in Construction Industry

    Directory of Open Access Journals (Sweden)

    A. S. Mozhdegani

    2017-10-01

    Full Text Available Ecotech architecture can be used as an effective strategy to minimize energy consumption and enhance the satisfaction of construction industry beneficiaries in the Middle East. The use of ecotech principles has been employed in different parts of the world. However, following a universal approach is not possible as local conditions are always to be considered Applications and examples of ecotech architecture are investigated in this paper. A proposed building design for the Cheetgar region in Tehran is also briefly demonstrated. A further insight on Masdar city in Abhu Dabi is provided. An overall discussion is made and key conclusions are drawn.

  5. 29 CFR 779.336 - Sales of building materials for commercial property construction.

    Science.gov (United States)

    2010-07-01

    ... property construction. Sales of building materials to a contractor or speculative builder for the... 29 Labor 3 2010-07-01 2010-07-01 false Sales of building materials for commercial property construction. 779.336 Section 779.336 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION...

  6. The impact of labour productivity on the Swedish construction industries

    OpenAIRE

    Forsberg, Azam

    2007-01-01

    There have been debates concerning what can be done about the current low labour productivity in the Swedish construction industries. High production cost in the construction industries has been a burning issue for a long time. On the other hand, process industries and organisations have taken the advantage of labour productivity measurement to reduce their production cost and eliminate non value-added activities. The purpose of this paper is to examine, why and how the process industries and...

  7. Integrating Building Information Modeling and Green Building Certification: The BIM-LEED Application Model Development

    Science.gov (United States)

    Wu, Wei

    2010-01-01

    Building information modeling (BIM) and green building are currently two major trends in the architecture, engineering and construction (AEC) industry. This research recognizes the market demand for better solutions to achieve green building certification such as LEED in the United States. It proposes a new strategy based on the integration of BIM…

  8. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  9. The construction industry takes up the gauntlet

    DEFF Research Database (Denmark)

    Pedersen, Elsebet Frydendal

    2005-01-01

    focus on health and safety, including attempts to reduce the high risks of accidents in the industry has also been adressed. This paper questions whether these activities are enough and presents an ongoing reseach project that illustrates the need for innovation from a more holistic, normative......Public and political dissadisfaction with the Danish construction industry in terms of low productivity, high prices and poor qualiyt has lead the industry to a stage where new methods and new innovative measures are needed. The industry, supported by the government, has engaged in a range...

  10. The Significance of Barriers to Entry in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Gerard de Valence

    2012-11-01

    Full Text Available This research looks at the significance of barriers that firms considering entry into the construction industry might face. Drawing on the microeconomic characteristics of imperfectly competitive and oligopolistic markets the analysis finds that there are a dozen barriers to entry that affect the industry, but their significance depends on the product type. The discussion covers the question of product homogeneity in construction and evidence for the existence of barriers to entry in concentration levels. Barriers to entry specific to construction are then identified, which leads to an analysis of how they operate and their significance (high, medium or low in different market types, thus increasing our understanding of construction industry dynamics.

  11. Analysis of Embodied Environmental Impacts of Korean Apartment Buildings Considering Major Building Materials

    Directory of Open Access Journals (Sweden)

    Seungjun Roh

    2018-05-01

    Full Text Available Because the reduction in environmental impacts (EIs of buildings using life-cycle assessment (LCA has been emphasized as a practical strategy for the sustainable development of the construction industry, studies are required to analyze not only the operational environmental impacts (OEIs of buildings, but also the embodied environmental impacts (EEIs of building materials. This study aims to analyze the EEIs of Korean apartment buildings on the basis of major building materials as part of research with the goal of reducing the EIs of buildings. For this purpose, six types of building materials (ready-mixed concrete, reinforcement steel, concrete bricks, glass, insulation, and gypsum for apartment buildings were selected as major building materials, and their inputs per unit area according to the structure types and plans of apartment buildings were derived by analyzing the design and bills of materials of 443 apartment buildings constructed in South Korea. In addition, a life-cycle scenario including the production, construction, maintenance, and end-of-life stage was constructed for each major building material. The EEIs of the apartment buildings were quantitatively assessed by applying the life-cycle inventory database (LCI DB and the Korean life-cycle impact assessment (LCIA method based on damage-oriented modeling (KOLID, and the results were analyzed.

  12. Implementation of project based learning on the Prakerin subject of vocational high school students of the building engineering to enhance employment skill readiness of graduates in the construction services field

    Science.gov (United States)

    Sugandi, Machmud

    2017-09-01

    Implementation of the Prakerin subject in the field of Building Engineering study program in vocational high school (VHS) are facing many issues associated to non-compliance unit of work in the industry and the expected competencies in learning at school. Project Based Learning (PBL) is an appropriate model learning used for Prakerin subject to increase student competence as the extension of the Prakerin implementation in the construction industry services. Assignments based on the selected project during their practical industry work were given to be completed by student. VHS students in particular field of Building Engineering study program who has been completed Prakerin subject will have a better job readiness, and therefore they will have an understanding on the knowledge, skills, and attitudes and good vision on the construction project in accordance with their experience during Prakerin work in the industry.

  13. Factors Promoting Innovation and Efficiency in the Construction Industry: A Comparative Study of New Zealand and Australia

    Directory of Open Access Journals (Sweden)

    Will Chancellor

    2015-05-01

    Full Text Available There have been numerous concerns about the lack of productivity improvement in the New Zealand construction industry.  The aim of this paper, therefore, is to determine the main drivers of productivity in the industry. The research used is a two-staged data envelopment analysis approach to achieve the aim. In terms of improvements to the productivity of construction in New Zealand, the study found that although there is a potential for gains through the greater use of research and development, apprentice training and degree education, as well as the consolidation of some building companies, there will be some limits to the gains that might be made. One main implication of the findings of the study, therefore, is that a renewed focus on education and skills training should be a priority of companies and policy makers in New Zealand.

  14. Irregular Shaped Building Design Optimization with Building Information Modelling

    Directory of Open Access Journals (Sweden)

    Lee Xia Sheng

    2016-01-01

    Full Text Available This research is to recognise the function of Building Information Modelling (BIM in design optimization for irregular shaped buildings. The study focuses on a conceptual irregular shaped “twisted” building design similar to some existing sculpture-like architectures. Form and function are the two most important aspects of new buildings, which are becoming more sophisticated as parts of equally sophisticated “systems” that we are living in. Nowadays, it is common to have irregular shaped or sculpture-like buildings which are very different when compared to regular buildings. Construction industry stakeholders are facing stiff challenges in many aspects such as buildability, cost effectiveness, delivery time and facility management when dealing with irregular shaped building projects. Building Information Modelling (BIM is being utilized to enable architects, engineers and constructors to gain improved visualization for irregular shaped buildings; this has a purpose of identifying critical issues before initiating physical construction work. In this study, three variations of design options differing in rotating angle: 30 degrees, 60 degrees and 90 degrees are created to conduct quantifiable comparisons. Discussions are focused on three major aspects including structural planning, usable building space, and structural constructability. This research concludes that Building Information Modelling is instrumental in facilitating design optimization for irregular shaped building. In the process of comparing different design variations, instead of just giving “yes or no” type of response, stakeholders can now easily visualize, evaluate and decide to achieve the right balance based on their own criteria. Therefore, construction project stakeholders are empowered with superior evaluation and decision making capability.

  15. Norwegian building's energy policy: multiple and inconsistent; Norsk byggenergipolitikk: mangfoldig og inkonsistent

    Energy Technology Data Exchange (ETDEWEB)

    Boasson, Elin Lerum

    2009-09-15

    Historically, Norwegian building-construction policies have been part of the state's welfare policy. After 2000, a new conceptualisation of buildings emerged in Europe. Buildings were now regarded as a part of the energy system. The term 'energy performance of buildings' covers both the thermal quality of the building envelope and on-site energy production. In 2002 the EU developed an Energy Performance of Buildings Directive, while EU state aid regulations constrained national support schemes directed at fostering buildings with high energy performance. The building construction industry is a loosely coupled industry, and by year 2000 building construction was rather de-politicized. Although governmental regulations tend to be developed by governmental organisations and research communities in collaboration, political executives have, from time to time after year 2000, engaged directly in the development policy regarding energy performance of buildings. This report explores: 1) Why have Norwegian governments, in the period between 2000 and 2008, developed four strains of policies directed toward promoting buildings with high energy performance? 2) How did the European environment, the building construction sector (industry and governmental regulators) and the Norwegian governmental hierarchical steering intervene and shape the outcomes? (Author)

  16. Future Directions for Building Services Technologies in Denmark

    DEFF Research Database (Denmark)

    Marsh, Rob

    2008-01-01

    strategies for the effective integration of building services, and by developing new industrialised solutions for building services. The paper is based on the current Danish situation, and is based on linking research on building services, user needs, building design and new industrial processes.  ......  The hypothesis of this paper is that industrial transformation in the Danish construction sector needs in the future to focus on integrating building services technologies into the buildings. This can be illustrated by analysing historical developments in building services usage, exploring design...

  17. PROSPECTS OF ESTABLISHING EARTHQUAKE RESISTANT BUILDINGS FROM TUBE CONCRETE CONSTRUCTIONS

    Directory of Open Access Journals (Sweden)

    Abdujafar I. Akaev

    2017-01-01

    Full Text Available Abstract. Objectives The aim of the research is to find optimal design solutions for the erection of buildings that will ensure their reliability and durability, compliance with environmental requirements, fire resistance and earthquake resistance. In this regard, the task is to determine the advantages and prospects of erecting earthquake resistant buildings from tube concrete constructions, since they are distinct in constructive, technological and economic efficiency when are used as vertical load-bearing struts of high-rise buildings. Method The technique for calculating the strength of normal sections of eccentrically-compressed tube concrete elements uses a nonlinear deformation model, taking into account the joint operation of the steel shell and the concrete core under the conditions of triaxial compression. Results In the article the review of the newest world experience of using tube concrete as vertical load-bearing structures for public facilities from the standpoint of earthquake resistant construction is given. The international practices of public facility construction ranging in height from 100 to 600 m with the use of tube concrete technology, including regions with dangerous natural and man-made conditions, have been studied. The structural, operational and technological advantages and disadvantages of tube concrete technology are analysed. Methods for calculating the strength of concrete tube elements in the case of central compression are considered: according to the so-called deformation theory, the state of total destruction of both concrete and tube fluidity attained at maximum pressure are indicated by the beginning of "tube flow on the longitudinal axis". The advantages and disadvantages of both methods are shown. Factors constraining the introduction and wider application of tube concrete constructions in Russia are considered. Conclusion While the advantages of concrete tube constructions in their extensive

  18. Structural health monitoring and lifecycle-management for civil engineering constructions in power plants and industrial facilities; Zustandsueberwachung und Lebensdauermanagement von baulichen Einrichtungen in Kraftwerken und Industrieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Lehnen, Dieter; Demmer, Martin; Pfister, Tobias [ZERNA Planen und Pruefen GmbH, Bochum (Germany)

    2013-09-01

    In contrast to other fields of engineering, structural health monitoring and lifecycle management for civil engineering constructions in power plants and industrial facilities have to be developed yet. The necessity of this development immediately arises from the building regulations law with its extensive set of regulations as well as from economic constraints. Approaches and methods of structural health monitoring and lifecycle management for civil engineering constructions in power plants and industrial facilities could be improved intensively during recent years. The paper focuses on practical examples that show the necessity of comprehensive and strategic structural health monitoring in conjunction with lifecycle management for civil engineering constructions in power plants and industrial facilities unambiguously und clear. (orig.)

  19. Criteria of the effectiveness of a liaison center for the machine building industry

    International Nuclear Information System (INIS)

    Hofer, P.; Wolff, H.; Franzen, D.

    1977-06-01

    The study aimed at working out a catalogue of criteria for the effective work of a liaison center for the machine building industry within the planned system of information and documentation of the German Government. By selecting this objective, the investigation methodically demanded a continuous change between theoretical analysis (study of literature, analytical deduction of the framework for a user-oriented information system) and empirical observation of information behaviour in the machine building industry (personal interviews with enterprises and important information sources for the machine building industries). An information system keyed to the information needs of the machine building industry must cover three main phases: Collection and documentation of information, selecting and procuring the needed information as well as encouraging and consulting the clients on the use of information. These different tasks complement one another, they correspond to different functions within enterprises: management, staff, and information function. Central point of a liaison center must be the task of selecting the required information (making information available, selling good information, analysing the information needs of clients), completed by fields of activity in documenting information (specifically for the machine building industry) and consulting clients on the use of information (agency for contacts, drawing the clients' attention to the complexity of machine building problems). A concrete catalogue of criteria for an effective conception of a liaison center for the machine building industry has been worked out. (orig.) [de

  20. Criteria of the effectiveness of a liaison center for the machine building industry

    International Nuclear Information System (INIS)

    Hofer, P.; Wolff, H.; Franzen, D.; Schlichting, J.; Weidig, I.

    1978-04-01

    The study aimed at working out a catalogue of criteria for the effective work of a liaison center for the machine building industry within the planned system of information and documentation of the German Government. By selecting this objective, the investigation methodically demanded a continuous change between theoretical analysis (study of literature, analytical deduction of the framework for a user-oriented information system) and empirical observation of information behaviour in the machine building industry (personal interviews with enterprises and important information sources for the machine building industries). An information system keyed to the information needs of the machine building industry must cover three main phases: Collection and documentation of information, selecting and procuring the needed information as well as encouraging and consulting the clients on the use of information. These different tasks complement one another, they correspond to different functions within enterprises: management, staff, and information function. Central point of a liaison center must be the task of selecting the required information (making information available, selling good information, analysing the information needs of clients), completed by fields of activity in documenting information (specifically for the machine building industry) and consulting clients on the use of information (agency for contacts, drawing the client's attention to the complexity of machine building problems). A concrete catalogue of criteria for an effective conception of a liaison center for the machine building industry has been worked out. (orig.) [de

  1. Strategy of Construction and Demolition Waste Management after Chemical Industry Facilities Removal

    Science.gov (United States)

    Tashkinova, I. N.; Batrakova, G. M.; Vaisman, Ya I.

    2017-06-01

    Mixed waste products are generated in the process of irrelevant industrial projects’ removal if conventional techniques of their demolition and dismantling are applied. In Russia the number of unused chemical industry facilities including structures with high rate of wear is growing. In removing industrial buildings and production shops it is used conventional techniques of demolition and dismantling in the process of which mixed waste products are generated. The presence of hazardous chemicals in these wastes makes difficulties for their use and leads to the increasing volume of unutilized residues. In the process of chemical industry facilities’ removal this fact takes on special significance as a high level of hazardous chemicals in the waste composition demands for the realization of unprofitable measures aimed at ensuring environmental and industrial safety. The proposed strategy of managing waste originated from the demolition and dismantling of chemical industry facilities is based on the methodology of industrial metabolism which allows identifying separate material flows of recycled, harmful and ballast components, performing separate collection of components during removal and taking necessary preventive measures. This strategy has been tested on the aniline synthesis plant being in the process of removal. As a result, a flow of 10 wt. %, subjected to decontamination, was isolated from the total volume of construction and demolition waste (C&D waste). The considered approach allowed using the resource potential of more than 80wt. % of waste and minimizing the disposed waste volume.

  2. An assessment of drug testing within the construction industry.

    Science.gov (United States)

    Gerber, Jonathan K; Yacoubian, George S

    2002-01-01

    Drug testing in the workplace has gone from virtual nonexistence to widespread employer acceptance during the past two decades. This growth is particularly significant for the construction industry. High rates of alcohol and other drug use, coupled with the high-risk, safety-sensitive nature of the industry, have prompted the development of a variety of drug surveillance and prevention strategies. Despite this growing vigilance, no scholarly works have examined the impact of drug-related policies in the construction industry. To address this limitation, we investigate the efficacy of workplace drug-testing programs in reducing injury incident rates and workers' compensation experience-rating modification factors (MODs) within the construction industry. Analyses indicate that companies with drug-testing programs experienced a 51 percent reduction in incident rates within two years of implementation. Moreover, companies that drug test their employees experienced a significant reduction in their MODs. Policy implications are discussed in light of the current findings.

  3. National industry and the constraints for participating in NPP construction

    International Nuclear Information System (INIS)

    Sriyana; Moch Djoko Birmano

    2012-01-01

    Readiness of nuclear power construction benchmarks is the extent to which the infrastructure's has been prepared. One aspect that needs to be prepared is the national industry involvement. How far the industry is ready and will be involved in future development. Nuclear power development planning is a long-term planning, so, it is necessary to analyze about the supporting items and also the constraints. The purpose of this paper is to parse what about the constraints of national industry to participate in the construction of nuclear power plants. The method are a literature study, data collection of industry capability and industry experience, as well as discussion with industry practitioners. From the above data and analysis can be concluded that the constraints faced by the national industry in participating for NPP construction are: (1) Government policy is unclear, (2) The potential for the industrial market which needs to be guaranteed, (3) The policy horizon just for short-term interests only, (4) Lack of the big manufacturer that was taken action as another industries driver, (5) The competitiveness which still need to continue enhanced, (6) Industry players that only profit-oriented and do not take sides on enhancing of the national capability. (author)

  4. Structure of steel reactor building and construction method therefor

    International Nuclear Information System (INIS)

    Yamakawa, Toshikimi.

    1997-01-01

    The building of the present invention contains a reactor pressure vessel, and has double steel plate walls endurable to elevation of inner pressure and keeping airtightness, and shielding concretes are filled between the double steel plate walls. It also has empty double steel plate walls not filled with concretes and has pipelines, vent ducts, wirings and a support structures for attaching them between the double steel plate walls. It is endurable to a great inner pressure satisfactory and keeps airtightness by the two spaced steel plates. It can be greatly reduced in the weight, and can be manufactured efficiently with high quality in a plant by so called module construction, and the dimension of the entire of the reactor building can be reduced. It is constructed in a dock, transported on the sea while having the space between the two steel plate walls as a ballast tanks, placed in the site, and shielding concretes are filled between the double steel plate walls. The term for the construction can be reduced, and the cost for the construction can be saved. (N.H.)

  5. Energy impacts of recycling disassembly material in residential buildings

    International Nuclear Information System (INIS)

    Gao, Weijun; Ariyama, Takahiro; Ojima, Toshio; Meier, Alan

    2000-01-01

    In order to stop the global warmth due to the CO2 concentration, the energy use should be decreased. The investment of building construction industry in Japan is about 20 percent of GDP. This fraction is much higher than in most developed countries. That results the Japanese building construction industry including residential use consumes about one third of all energy and resources of the entire industrial sectors. In order to save energy as well as resource, the recycle of the building materials should be urgent to be carried out. In this paper, we focus on the potential energy savings with a simple calculated method when the building materials or products are manufactured from recycled materials. We examined three kinds of residential buildings with different construction techniques and estimated the decreased amount of energy consumption and resources resulting from use of recycled materials. The results have shown for most building materials, the energy consumption needed to remake housing materials from recycled materials is lower than that to make new housing materials. The energy consumption of building materials in all case-study housing can be saved by at least 10 percent. At the same time, the resource, measured by mass of building materials (kg) can be decreased by over 50 percent

  6. management practices in the ghanaian house building industry

    African Journals Online (AJOL)

    User

    Building and Road Research Institute, Centre for Scientific and Industrial Research,. Fumuesua ... expected production target amidst an acute .... the responsibility for the management of design .... substitutes already being manufactured since.

  7. Assessing Sustainability in Developing Country Contexts: The Applicability of Green Building Rating Systems to Building Design and Construction in Madagascar and Tanzania

    OpenAIRE

    Ozolins, Peter Charles

    2010-01-01

    Buildings have significant and complex impacts both in their construction and in their use. Green building rating systems have been developed and promoted in more economically-advanced countries to offer guidelines to reduce negative impacts and to promote sustainable practices of building construction and operations. The green building rating system called Leadership in Energy and Environmental Design (LEED), established in 1995 by the U.S. Green Building Council, is increasingly accepted as...

  8. Study of radon diffusion coefficient for technologically enhanced building construction materials

    International Nuclear Information System (INIS)

    Narula, A.K.; Goyal, S.K.; Chauhan, R.P.; Chakarvarti, S.K.

    2012-01-01

    Most building materials of natural origin contain small amounts of Naturally Occurring Radioactive Materials (NORMs), mainly radionuclides from the 226 Ra and 232 Th decay chains and 40 K. The origin of these materials is the earths crust, but they find their way into building materials, air, water, food and the human body itself. The worldwide average indoor effective dose due to gamma rays from building materials is estimated to be about 0.4 mSv per year. In many parts of the world, building materials containing radioactive materials have been used for generations. As individuals spend more than 80% of their time indoors, the internal and external radiation exposure from building materials creates prolonged exposure situations. The internal (inhalation) radiation exposure is due to 222 Rn and their short lived decay products exhaled from building materials into the room air. The average activity concentrations of 226 Ra, 232 Th and 40 K in the earths crust are 35, 30 and 400 Bq/kg respectively. However, elevated levels of natural radionuclides causing annual doses of several mSv were identified in some regions around the world. Recycled industrial by-products containing Technologically Phosphogypsum, a by-product in the production of phosphate fertilizers is used as building material, and red mud, a waste from primary aluminum production, is used in bricks, ceramics and tiles. The increased tendency of the building material industry to use industrial wastes as substitutes for natural products having relatively high activity concentration of NORMs and the increased exposure caused by them were the driving forces for undertaking the present investigation. (author)

  9. Construction of a Solid State Research Facility, Building 3150

    International Nuclear Information System (INIS)

    1993-07-01

    The Department of Energy (DOE) proposes to construct a new facility to house the Materials Synthesis Group (MSG) and the Semiconductor Physics Group (SPG) of the Solid State Division, Oak Ridge National Laboratory (ORNL). The location of the proposed action is Roane County, Tennessee. MSG is involved in the study of crystal growth and the preparation and characterization of advanced materials, such as high-temperature superconductors, while SPG is involved in semiconductor physics research. All MSG and a major pardon of SPG research activities are now conducted in Building 2000, a deteriorating structure constructed in the 1940. The physical deterioration of the roof; the heating, ventilation, and air conditioning (HVAC) system; and the plumbing make this building inadequate for supporting research activities. The proposed project is needed to provide laboratory and office space for MSG and SPG and to ensure that research activities can continue without interruption due to deficiencies in the building and its associated utility systems

  10. Incorporating Lean Construction agent into the Building Standards Act: the Spanish case study

    Directory of Open Access Journals (Sweden)

    Brioso Xavier

    2016-12-01

    Full Text Available There is a demand for lean construction in Europe; even though lean construction is still an emerging field and there is growing interest, there are no regulations on this topic. The main objective of this research is to regulate this role when in a project and to define and develop a building agent structure, according to the Building Standards Act (LOE by its acronym in Spanish, to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain, there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, who are defined in the courts as “constructive managers” or similar. For this reason, courts could establish in the future several liabilities for the lean construction specialist and other agents of the project, depending on their actions and based on the implementation of the lean project delivery system, the target value design and the integrated project delivery. Conversely, it is possible that the level of action of the lean construction specialist may comprise design management, construction management and contract management. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the lean construction specialist. The creation of the following agents is proposed: design manager, construction manager and contract manager, definitions that are developed in this study. These agents are loosely defined, because any project manager, building information modeling manager or similar may act as one or as more-than-one of them. Finally, the creation of the lean construction manager is also proposed, as the agent who takes on the role of the design manager, construction manager and contract manager, but focused on the lean production principles.

  11. Sequestering carbon dioxide in industrial polymers: Building materials for the 21st century

    Energy Technology Data Exchange (ETDEWEB)

    Molton, P.M.; Nelson, D.A.

    1993-06-01

    This study was undertaken to determine the possibility of developing beneficial uses for carbon dioxide as a key component for a large-volume building product. Such a use may provide an alternative to storing the gas in oceanic sinks or clathrates as a way to slow the rate of global warming. The authors investigated the concept that carbon dioxide might be used with other chemicals to make carbon-dioxide-based polymers which would be lightweight, strong, and economical alternatives to some types of wood and silica-based building materials. As a construction-grade material, carbon dioxide would be fixed in a solid, useful form where it would not contribute to global warming. With the probable imposition of a fuel carbon tax in industrialized countries, this alternative would allow beneficial use of the carbon dioxide and could remove it from the tax basis if legislation were structured appropriately. Hence, there would be an economic driver towards the use of carbon-dioxide-based polymers which would enhance their future applications. Information was obtained through literature searches and personal contacts on carbon dioxide polymers which showed that the concept (1) is technically feasible, (2) is economically defensible, and (3) has an existing industrial infrastructure which could logically develop it. The technology exists for production of building materials which are strong enough for use by industry and which contain up to 90% by weight of carbon dioxide, both chemically and physically bound. A significant side-benefit of using this material would be that it is self-extinguishing in case of fire. This report is the first stage in the investigation. Further work being proposed will provide details on costs, specific applications and volumes, and potential impacts of this technology.

  12. Ecological and Economic Use of Energy by Optimization of Building Construction

    International Nuclear Information System (INIS)

    Jahrmann, H. J.

    1998-01-01

    A major part of energy used in daily life is consumed by heating buildings during cold weather periods and for cooling buildings at warmer times. Another major use of energy takes place during production of building materials, construction of the building itself and the depletion and disposal of this building at the end of its lifecycle. Therefore it seems apparent, that effective conservation and saving of energy is a very comprehensive and total approach. The topic is not solely energy saving, it rather is the most effective use of economical and ecological resources. To be energy conscious we have to give closer look to all phases in the existence of a building, and not only of the building. The human being as well must be thoroughly considered in his surrounding, all aspects of his housing suspected for the waste and potential of energy use. So human itself, with his well being in the house, is a major source of energy use. Even the humans health and sickness with its need for cure will cause significant energy input. In the first phase of energy saving programs two aspects should be focused: 1. Primary energy need of construction materials: Primary energy need is the amount of energy used to produce a construction material; from its base origin up to assembling in the housing. Complete ecological balances already exist for a number of materials. Significant difference between materials is observed. The potential for energy saving is impressive. At least 10-30% total energy conservation during the lifecycle of a building appears likely. In many cases a strong positive impact on local economy is expected too. 2. Energy saving by improvement of the thermal quality of buildings: Energy conscious construction of buildings shows an enormous potential for saving. Thermal insulation and effective heating and ventilation systems promise energy savings in the amount of 30-70%. Infrared thermal building analysis and software simulations used prior revitalization of

  13. Mastering the political Process of Building Innovation Networks - A Case from the Danish Construction Industry

    DEFF Research Database (Denmark)

    Stissing Jensen, Jens; Koch, Christian; Thomassen, Mikkel

    2008-01-01

    Drawing on network of innovation and organizational politics perspectives this paper analyzes the role of an innovation broker organization in developing and supporting an inter-organizational innovation process in the Danish construction industry. The aim is to implement an ICT-based product...... configuration tool to support the production, sale, and installation of balconies. It is suggested that the innovation broker was successful in stabilizing the innovation process by supplying minimal structures which provided a template which facilitated a combination of individual flexibility and overall...... the network. The innovation thus grew strong enough to replace existing practices and identities and to embed new ones into new organizational structures and a new business-concept...

  14. Community involvement in constructing village health buildings in Uganda and Sierra Leone.

    Science.gov (United States)

    Mitchell, M

    1995-11-01

    Three public health projects in Uganda and Sierra Leone are used to illustrate a new approach to construction of health buildings in villages. Emphasis is placed on community involvement. The health projects were comprehensive and relied on health education, employment of local village health workers, and establishment of village health committees. The objective of community involvement was described as encouragement of people to change their own diets and living conditions. This approach to primary health care is considered to be a strong basis for sustainable social development. Each of the three communities initiated the building projects slightly differently. There was a range of structures: traditional meeting halls, simple rooms with imported materials and a pit latrine, new buildings combining local and imported materials and labor, new nontraditional buildings, rehabilitated existing nontraditional buildings with imported labor and materials, and temporary mobile clinics. Community involvement was at different levels. All three projects were the result of a combined effort of national governments or mission hospitals, nongovernmental organizations, and the host community. The following should be considered before beginning construction: a suitable site, appropriate staff accommodation, the likely motivation of the host community, seasonality, local materials available, availability of skilled labor, and design. A plan of work during construction should include a building design, site supervision, transportation of local and non-local materials, unskilled labor, and skilled labor. Village health committees with or without government help would be responsible for maintenance of buildings after construction. A key feature of this approach is the assessment of the community's ability and capacity to contribute.

  15. The raft foundation reinforcement construction technology of Hongyun Building B tower

    Science.gov (United States)

    Liu, Yu; Yin, Suhua; Wu, Yanli; Zhao, Ying

    2017-08-01

    The foundation of Hongyun building B tower is made of raft board foundation which is 3300mm in the thickness include four kinds of reinforcement Φ32, Φ28, Φ12 and 12 steel grade two, in respective. It is researched that the raft foundation mass concrete construction technology is expatiated from temperature and cracks of the raft foundation and the temperature control and monitoring of the concrete base slab construction and concrete curing. According to the characteristics with large volume and thickness of the engineering of raft foundation, the construction of the reinforced force was calculated and the quality control measures were used to the reinforcement binding and connection, so it is success that Hongyun Building B tower raft foundation reinforced construction.

  16. Labour Productivity in the New Zealand Construction Industry: A Thorough Investigation

    Directory of Open Access Journals (Sweden)

    John E Tookey

    2011-03-01

    Full Text Available Productivity growth is strongly correlated to economic growth and increases in welfare. This fact also holds true at the industry level and is particularly true in the NZ construction industry, since productivity growth in this sector may have significant effects on the affordability of housing in the country. In recent years construction in NZ has been subjected to a series of reports that have either highlighted ‘failure’ to grow productivity or have exhorted the industry to improve its ‘poor performance’.  However thus far little by way of analysis has gone into the productivity figures that have been quoted, nor has much been done to explain and justify if or why these figures are correct or incorrect.This research seeks to deconstruct construction productivity figures in NZ and explain the patterns over recent years of ‘poor performance’ in comparison with other industries.  As such it will examine the nature of the NZ construction industry and analyse the historic statistics related to its labour productivity. This will provide an overall understanding of the sector as well as those extraneous factors that may have significant influences on the NZ construction sector.The research found that while factors influencing inputs of labour productivity measure such as labour and material costs remained stable, factors impacting the corresponding outputs such as house and land prices, value of work in Non-residential and Infrastructure construction grew significantly between 1997 and 2007. Given the positive skewing effect of standard economic indicators (inflation etc on construction labour productivity figures, the relatively poor performance of construction is worrying for the industry. The paper concludes by demonstrating labour productivity in construction is significantly worse performing than previously suspected.

  17. RESOURCE SAVING IN CONSTRUCTION INDUSTRY WITH HIGHWAY BRANCH AS EXAMPLE

    Directory of Open Access Journals (Sweden)

    A. V. Roudensky

    2011-01-01

    Full Text Available Consumption of energy is an objective (independent on cost fluctuations technical efficiency criterion of any construction or repair work. Highway/road (particularly bituminous pavement sector is an important construction industry part. Bituminous road pavement construction consists of such components as excavation and preparation of basic materials, manufacture of mixes, ready mix laying/compacting and transportation of all materials. Average energy consumption for every bituminous pavement construction component is assessed. Approach to resource and energy saving presented in the article may be used in construction industry to develop and implement innovativetechnical and organizational solutions both of general application and for individual projects.

  18. Factors Affecting Time, Cost and Quality Management in Building ...

    African Journals Online (AJOL)

    The study is an assessment of time, cost and quality management in the Nigerian construction industry, and it aims to explore time cost and quality management in the construction industry. The objective of the study is to identify factors affecting time; cost and quality management in building construction projects. This study ...

  19. perceptions of undergraduate construction students on industrial

    African Journals Online (AJOL)

    User

    Keywords: Industrial training, perception, construction graduates, Ghana. INTRODUCTION .... higher educational institutions to continue to strengthen its links ... the profile of the respondents; ... the teaching departments in the placement of.

  20. Construction of the main building network environment in IHEP

    International Nuclear Information System (INIS)

    Wang Yanming

    2004-01-01

    Based on the new network structure at IHEP, we re-constructed the network in Main Building at IHEP in order to realize the goal of steadily supporting the network application. We chose high performance and administrable switches and configured them properly. This improved that the network security, management ability. So the network at Main Building became more safe, steady, reliable and high-efficient. (authors)

  1. Risk management in the construction industry: a new literature review

    Directory of Open Access Journals (Sweden)

    Renault Berenger Y.

    2016-01-01

    Full Text Available The construction industry is well known as a highly risk prone industry owing to the complexity of its activities and dynamic project environments generating an atmosphere of risks that must be taken into consideration in the decision process. For this reason, we have developed this treatise to elucidate the fundamentals of risk management through a concise new proposal of literature review for risk management in construction. Our explanation of this is venture is that over the years, this area has been acknowledged as a crucial process in the business institutions and the most discussed subject among experts and researchers in the construction sector. We have tried in this report to present the most recent studies considering the impossibility to present all definitions of the concept of risk. This study is mainly a literature review; it looks at the literature relating to the concept of risk, risk management in construction as well as methods used in construction industry.

  2. Buildings and Health. Educational campaign for healthy buildings. Educational material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    In recent years health and comfort problems associated with the indoor climate have come to constitute a problem in Sweden. To come to grips with this a nationwide educational campaign on Buildings and Health is being run. It is directed to those involved in planning, project design, construction and management of buildings. The objective is to convey a body of knowledge to the many occupational and professional groups in the construction sector on how to avoid indoor climate problems in homes, schools, offices and other workplaces. The campaign is being run by the Swedish National Board of Housing and Planning and the Swedish Council for Building Research, in co-operation with various organizations and companies in the construction industry, and with municipalities and authorities. The knowledge which is being disseminated through the campaign is summarized in this compendium. figs., tabs.

  3. Distribution of materials in construction and demolition waste in Portugal.

    Science.gov (United States)

    Coelho, André; de Brito, Jorge

    2011-08-01

    It may not be enough simply to know the global volume of construction and demolition waste (CDW) generated in a certain region or country if one wants to estimate, for instance, the revenue accruing from separating several types of materials from the input entering a given CDW recycling plant. A more detailed determination of the distribution of the materials within the generated CDW is needed and the present paper addresses this issue, distinguishing different buildings and types of operation (new construction, retrofitting and demolition). This has been achieved by measuring the materials from buildings of different ages within the Portuguese building stock, and by using direct data from demolition/retrofitting sites and new construction average values reported in the literature. An attempt to establish a benchmark with other countries is also presented. This knowledge may also benefit industry management, especially that related to CDW recycling, helping to optimize procedures, equipment size and operation and even industrial plant spatial distribution. In an extremely competitive market, where as in Portugal low-tech and high environmental impact procedures remain the norm in the construction industry (in particular, the construction waste industry), the introduction of a successful recycling industry is only possible with highly optimized processes and based on a knowledge-based approach to problems.

  4. Green Construction in Building Renovation

    Science.gov (United States)

    Ksit, Barbara; Majcherek, Michał

    2016-06-01

    Modern materials and construction solutions draw more and more attention to ecology and building certification. Among the criteria appearing in revitalization, an important element is bringing plants back into heavily urbanized areas. In its natural form, this is not possible to carry out everywhere, often requiring large amounts of space. Nowadays, however, there are a number of green roofs and green wall systems, allowing "greener" construction without making significant changes in the urban environment. The article includes a presentation and analysis of selected solutions of biological surfaces known as green roofs and green walls, specifying various solutions and their most important features. The case study focuses primarily on material and design solutions, as well as the potential benefits, risks and limitations in their use. Plants structures on the surfaces of vertical and horizontal partitions continue to be a very interesting alternative to take into account when applying for grants, such as LEED or BREEAM certificates.

  5. Method of constructing reactor buildings

    International Nuclear Information System (INIS)

    Hyuga, Takenori; Nagai, Fumio; Akutsu, Masayoshi.

    1985-01-01

    Purpose: To shorten the construction period for LMFBR type reactors, as well as smoothly introduce high pressure steams generated in concretes upon loss of coolant accidents to the outside of the system. Method: After disposing a liner plate as a chamber lining of reactor buildings, heat insulation materials having steam discharge channels at the outer surface are attached to the outside of the liner plate and, further, an organic films are disposed to the outside of the heat insulation materials. Then, concretes are spiked to the outside of the organic films using the liner plate and the heat insulation material as the mold for concretes. In this way, the construction period can be shortened by utilizing the liner plate and the heat insulation materials as the mold for concretes, as well as steams at high temperature resulted in the concretes upon loss of coolant accidents can smoothly be discharged to the outside of the system. (Moriyama, K.)

  6. Application of BIM technology in green building material management system

    Science.gov (United States)

    Zhineng, Tong

    2018-06-01

    The current green building materials management system in China's construction industry is not perfect, and there are still many shortcomings. Active construction of green building materials management system based on BIM technology, combined with the characteristics of green building materials and its relationship with BIM technology application, is urgently needed to better realize the scientific management of green building materials.

  7. The use of nanomodified concrete in construction of high-rise buildings

    Science.gov (United States)

    Prokhorov, Sergei

    2018-03-01

    Construction is one of the leading economy sectors. Currently, concrete is the basis of most of the structural elements, without which it is impossible to imagine the construction of a single building or facility. Their strength, reinforcement and the period of concrete lifetime are determined at the design stage, taking into account long-term operation. However, in real life, the number of impacts that affects the structural strength is pretty high. In some cases, they are random and do not have standardized values. This is especially true in the construction and exploitation of high-rise buildings and structures. Unlike the multi-storey buildings, they experience significant loads already at the stage of erection, as they support load-lifting mechanisms, formwork systems, workers, etc. The purpose of the presented article is to develop a methodology for estimating the internal fatigue of concrete structures based on changes in their electrical conductivity.

  8. Supply chain of steel industries for the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sahala M Lumbanraja

    2017-01-01

    Nuclear Power Plant (NPP) Construction needs steel materials for the manufacturing of heavy components and civil work construction. National industries is expected to supply steel components especially for non nuclear component needs. Supply chain of steel industries is required to know the potency of steel industries from upstream to downstream industries which can support the NPP construction sustainability. The type of steel needed in the NPP construction consist of structure steel, rebar, steel plate, etc. The aim of the study is to identify supply chain of steel industries from upstream industries to downstream industries so that they can supply steel needs in the NPP construction. The methodology used are literature review and industries survey by purposive sampling test which sent questionnaires and carrying out technical visits to the potential industries to supply steel components for NPP construction. From the analysis of the questionnaires and survey, it has been obtained that the Indonesian steel industries capable of supplying steel for construction materials of non-nuclear parts are PT. Krakatau Steel, PT. Gunung Steel Group (PT Gunung Garuda and PT. Gunung Raja Paksi), PT. Cilegon Fabricators and PT. Ometraco Arya Samanta. While steel materials for primary components with nuclear grade, such as steel materials for reactor vessels and pressure vessels, the Indonesian steel industry has not been able to supply them. Therefore, the Indonesian steel industries must improve its capability, both in raw material processing and fabrication capability in order to meet the requirements of specifications, codes and standards of nuclear grade. (author)

  9. Industry 4.0 Concept Introduction into Construction SMEs

    Science.gov (United States)

    Nowotarski, Piotr; Paslawski, Jerzy

    2017-10-01

    The article presents a general idea of Industry 4.0 concept with the introduction presenting descriptions of the most important aspects in terms of production and construction industry development. The importance of the SME sector is stressed showing that this group of companies plays significant role in the European economy. The main objective of the article is to define and show possible research areas connected with the introduction of Industry 4.0 concept into SMEs with the main focus on the construction sector. For this purpose, an analysis was made, based on the most recent literature, to point out actual needs in the SMEs sector in terms of its evolution into 4.0 level. What is more, the analysis was performed based on the most popular articles published in journals available in Thomson Reuters Web of Science Core Collection database regarding Industry 4.0 concept in the last decade showing the actual change of interest in this filed, taking into account possibility of usage of this concept in the construction and production sector. Authors tried to describe current knowledge regarding Industry 4.0 introduction for SMEs. Performed analysis showed that there is a wide spectrum of disciplines that are affected by the Industry 4.0 that needs to be examined considering introduction into SMEs. Study also showed that multidiscipline approach was not investigated so far to create special rules, procedures and methods and know-how designed for introduction of main principles of Industry 4.0 in the SME sector. Authors came to the conclusions that there should be more stress put into research in this field especially taking into account the huge potential which lies in SME sector in terms of global economic strength.

  10. A Study of the potency of construction service industries to support the first nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana

    2008-01-01

    The study was conducted to identify the potency of construction service industries to participate in nuclear power plant program in Indonesia. The potency is identified by evaluation results of national industries potency in some multinational construction service industries. The research methodology chosen was the survey method by sending questionnaires, visits to National industries, interview, and literature study. The data collection technique was sampling purposive. Data can be obtained from both primary and secondary data. The study results showed that the performance of construction service industries to support the NPP program must be increased through the selection of competent human resources, reliable equipment and an effective and efficient project management system, so that they can be expected to play necessary role in the nuclear power plant construction in Indonesia. (author)

  11. Improving Building Performance through Integrating Constructability in the Design Process

    OpenAIRE

    Ezzat Othman, Ayman Ahmed

    2011-01-01

    The traditional procurment approaches commonly adopted in construction projects and the involvement of multitude of various project participants with diverse objectives, skills and interests tended to separate design from construction.This separation obstructs contractors from providing designers with construction feedback and suggestions for design improvement, which ultimately hampers the improvement of building performance. Because of the importance of the design phase and the vit...

  12. Construction mediation and its hybridization: the case of the Hong Kong construction industry

    Directory of Open Access Journals (Sweden)

    Ng Pui-Lam

    2017-01-01

    Full Text Available In view of the sophisticated nature of construction disputes, specialized dispute resolution mechanisms are of pivotal importance to the satisfactory settlement between disputing parties. Among the various construction dispute resolution mechanisms, mediation has been increasingly gaining recognition and acceptance. Its hybrid, namely mediation-arbitration (med-arb, has also emerged and has started receiving attention and appreciation. With special reference to the construction industry practice in Hong Kong, a commentary on the respective merits and demerits of construction mediation and construction med-arb, as well as the ways forward, are presented in this article.

  13. Investigation on Prefabricated Building System Skilled Component Installers

    OpenAIRE

    Nurul Rezuana Buyung; Md Azree Othuman Mydin; Abdul Naser Abdul Ghani

    2013-01-01

    In the face of an increasingly challenging era of globalization, skills and new equipments which includes prefabricated building components, known as Industrialized Building System (IBS) has been introduced towards achievement of sustainable construction. IBS is a construction system in which the components are manufactured in a factory, on or off site, positioned and assembled into complete structures with minimal additional site work. IBS requires high construction precisi...

  14. Utilization of building information modeling in infrastructure’s design and construction

    Science.gov (United States)

    Zak, Josef; Macadam, Helen

    2017-09-01

    Building Information Modeling (BIM) is a concept that has gained its place in the design, construction and maintenance of buildings in Czech Republic during recent years. This paper deals with description of usage, applications and potential benefits and disadvantages connected with implementation of BIM principles in the preparation and construction of infrastructure projects. Part of the paper describes the status of BIM implementation in Czech Republic, and there is a review of several virtual design and construction practices in Czech Republic. Examples of best practice are presented from current infrastructure projects. The paper further summarizes experiences with new technologies gained from the application of BIM related workflows. The focus is on the BIM model utilization for the machine control systems on site, quality assurance, quality management and construction management.

  15. Risk Factors of Building Apartments for University Talent through the Agent Construction Mode in China: Interrelationship and Prioritization

    Directory of Open Access Journals (Sweden)

    Zhengrong Liu

    2016-03-01

    Full Text Available Apartments for university talent (AUT, are apartments provided to staff at non-market price, in order to attract outstanding scholars from around the world to work in universities and improve educational quality. This has been a critical issue in achieving social sustainability in China during rapid urbanization and industrialization. The agent construction mode has been adopted to build AUT because universities usually lack relevant management experience. The agent construction mode is a type of turnkey engineer construction based on the principal-agent model, project bidding mode, engineering contracting projects, and project supervision system. Risk factors are important considerations for both universities and agent construction companies. Although some studies have investigated the risk factors, only a few studies have identified the hierarchical structure of relevant risk factors. Therefore, the interrelationship and prioritization of the risk factors remain unknown, and this situation presents a barrier to better risk management. This paper investigates the interrelationship of risk factors with interpretative structural modeling (ISM. In addition, fuzzy MICMAC (matric d’impacts croises-multiplication appliqué a un classemen analysis was conducted to prioritize the risk factors. The findings provide useful references for better risk management of building AUT through the agent construction mode. Although this study focuses on China, the analytical process can also be generalized to other research topics and other countries.

  16. Industry Research and Recommendations for Small Buildings and Small Portfolios

    Energy Technology Data Exchange (ETDEWEB)

    Langner, Rois [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hendron, Bob [National Renewable Energy Lab. (NREL), Golden, CO (United States); Pless, Shanti [National Renewable Energy Lab. (NREL), Golden, CO (United States); Huppert, Mark [National Trust for Historic Preservation, Washington, DC (United States); Cochrane, Ric [National Trust for Historic Preservation, Washington, DC (United States)

    2013-12-01

    Small buildings have been left behind in the energy efficiency marketplace because financial and technical resources have flowed to larger commercial buildings. DOE's Building Technologies Office works with the commercial building industry to accelerate the uptake of energy efficiency technologies and techniques in existing and new commercial buildings (DOE 2013). BTO recognizes the SBSP sector'spotential for significant energy savings and the need for investments in resources that are tailored to this sector's unique needs. The industry research and recommendations described in this report identify potential approaches and strategic priorities that BTO could explore over the next 3-5 years that will support the implementation of high-potential energy efficiency opportunities for thisimportant sector. DOE is uniquely positioned to provide national leadership, objective information, and innovative tools, technologies, and services to support cost-effective energy savings in the fragmented and complex SBSP sector. Properly deployed, the DOE effort could enhance and complement current energy efficiency approaches. Small portfolios are loosely and qualitatively defined asportfolios of buildings that include only a small number of small buildings. This distinction is important because the report targets portfolio owners and managers who generally do not have staff and other resources to track energy use and pursue energy efficiency solutions.

  17. New constructions of wire ropes for the industry

    Directory of Open Access Journals (Sweden)

    ŠŠaderová Jana

    1996-03-01

    Full Text Available The wire ropes are used in different industrial fields. Their construction depends on the type of equipment and its purpose. Most frequently we meet with ropes at different transport and hoisting equipments and very freqently in the civil industry. For users characteristics are important which must meet requirements of the individual regulations and standards of the selection of wire ropes for the concrete equipment. The most important is the factor of safety being safeguarded by the corresponding bearing capacity of the rope. The service life of rope is interesting for the user, too, because of having an influence on the economy of the equipment on which the rope is working. These problems are solved by the grant project at our department . We are aimed at questions of the optimization of construction of wire rope with regard to their geometric construction and service life. Respectively on the basis of elaborated computer software eightstrand ropes of parallel construction were disigned and produced at the Drôtov ň a Hlohovec. The results of the fatigue tests confirmed their better qualitative properties, longer service life and economy advantages for users, too. Their using is possible and suitable on the new hoisting eguipment on the surface, in the undeground and in the hole drilling industry. By the application of the computer technique is also possible to improve the parametres of six-strands` construction of rope, the classic and parallel constructions, especially their bearing capacity. This fact follows from the knowledge that for the production of rope we use calculated diameters of wires, which secure better utilization of the metal cross-section of the wire ropes.

  18. Mitigating delay and non-payment in the Malaysian construction industry

    Science.gov (United States)

    Mohamad, N.; Suman, A. S.; Harun, H.; Hashim, H.

    2018-02-01

    Construction industry is one of the industries that have contributed towards the rapid growth of development and economics in Malaysia. However, the industry is inundated with delay and non-payment issues between the two parties in contract that is the clients and contractors Even though there are contractual and administrative provisions in the standard forms of contract in Malaysia regarding payments, delay and non-payment issues still occur between them. The aim of the study is to develop measures to mitigate delay and non-payment issues between contractors and clients in the Malaysian construction industry. Questionnaire survey was conducted with clients and contractors in Klang Valley. Results from data analysis identified significant measures to mitigate delay and non-payment issues between contractors and clients which include contractors should submit their progress work invoicing with adequate documents; contractors should follow up constantly with client regarding payment; proper understanding of requirements with regards to payment; mutual discussion of problems with client to address problems in a timely manner and proper use of payment provisions in the standard form of contract. This study is significant to contractors and clients and to other construction players in order to reduce and minimise delay and non-payment issues for the growth of economy in the Malaysian construction industry.

  19. Environmental labelling of buildings and construction products: lessons for South Africa from global trends

    CSIR Research Space (South Africa)

    Ampofo-Anti, NL

    2012-07-01

    Full Text Available be informed by life cycle considerations. Environmental labelling in construction takes the form of whole building rating systems and construction product certification programmes. The First Generation building rating systems have to date experienced much...

  20. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    Science.gov (United States)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  1. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    Science.gov (United States)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  2. HIV infection in the South African construction industry.

    Science.gov (United States)

    Bowen, Paul; Govender, Rajen; Edwards, Peter; Lake, Antony

    2018-06-01

    South Africa has one of the highest HIV prevalences in the world, and compared with other sectors of the national economy, the construction industry is disproportionately adversely affected. Using data collected nationally from more than 57,000 construction workers, HIV infection among South African construction workers was estimated, together with an assessment of the association between worker HIV serostatus and worker characteristics of gender, age, nature of employment, occupation, and HIV testing history. The HIV infection of construction workers was estimated to be lower than that found in a smaller 2008 sample. All worker characteristics are significantly associated with HIV serostatus. In terms of most at-risk categories: females are more at risk of HIV infection than males; workers in the 30-49 year old age group are more at risk than other age groups; workers employed on a less permanent basis are more at risk; as are workers not having recently tested for HIV. Among occupations in the construction industry, general workers, artisans, and operator/drivers are those most at risk. Besides yielding more up-to-date estimated infection statistics, this research also identifies vulnerable sub-groups as valuable pointers for more targeted workplace interventions by construction firms.

  3. Tender rules and trust influence on cooperation in the building industry

    DEFF Research Database (Denmark)

    Ussing, Lene Faber; Wandahl, Søren

    2012-01-01

    The building industry has for many years been criticized for not having as efficient and effective co-operation as other industries. Some parties in the building sector try to use a new form of collaboration as i.a. partnering. In a big part of those partnering projects a good working relationship...... exists, the building owner is satisfied, the involved companies earn money and the project finish in time. A lot of projects do not use partnering or other new forms of collaboration. In these projects the general impression is that the parties in the building sector are fighting instead of co......-operating. A questionnaire survey including building owners, contractors, suppliers, architects, engineers and client design advisor has been accomplished. The survey shows that the problem with co-operation among others is the way the tendering rules normally are used, where the normal assignment criterion is the lowest...

  4. The Use Potential of Traditional Building Materials for the Realization of Structures by Modern Methods of Construction

    Science.gov (United States)

    Spišáková, Marcela; Mačková, Daniela

    2015-11-01

    The sustainable building has taken off in recent years with many investors looking for new and different methods of construction. The traditional building materials can be made out of natural materials, while others can help to lower energy costs of the occupant once built. Regardless of what the goal of the investor is, traditional building materials and their use is on the rise. The submitted paper provides an overview of natural building materials and possible modern building systems using these construction materials. Based on the questionnaire survey is defined the use potential of traditional building materials for the realization of the construction by methods of modern constructions and then are determined the drivers and barriers of traditional materials through using modern methods of construction. Considering the analysis of the achieved results, we can identify the gaps in the construction market in Slovakia and also to assess the perception of potential investors in the field of traditional building materials use, which is the purpose of submitted paper.

  5. The Dutch Construction Industry: An Overview and Its Use of Performance Information

    OpenAIRE

    Van de Rijt, J.; Hompes, M.; Santema, S.C.

    2010-01-01

    This paper gives an overview of the Dutch Construction industry and elaborates further on its use of performance information. After giving an overview of the Dutch construction industry depicting size, major contractors, growth, profitability, value added, costs, productivity, this section is concluded by giving future predictions of the industry for the following years. A summary is given of the 2002 Dutch construction collusion as a means to give explanations for the persistent use of procu...

  6. THE APPLICATION OF THE JUST-IN-TIME PHILOSOPHY IN THE CHINESE CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Low Sui Pheng

    2011-10-01

    Full Text Available The Just-in-Time (JIT philosophy originated from the Toyota Production System (TPS and has been used in the manufacturing industry for many decades. It has helped to increase the productivity of the industry and has also increased the quality of its products. In recent years, numerous studies in developed countries have endeavoured to introduce JIT in the construction industry to reap similar benefits. This study focused on applying JIT to the Chinese construction industry with the goal of improving its performance and thus its competitiveness. This paper discusses the current state of the Chinese construction industry; presents the potential impediments to implementing JIT; and proposes a framework for JIT implementation in the areas of design, procurement, construction and inspection. The results of this study suggest that government and educational institutions should play a key role in spearheading the application of JIT in the construction industry in China.

  7. Traumatic brain injuries in the construction industry.

    Science.gov (United States)

    Colantonio, Angela; McVittie, Doug; Lewko, John; Yin, Junlang

    2009-10-01

    This study analyses factors associated with work-related traumatic brain injury (TBI), specifically in the construction industry in Ontario, Canada. This cross-sectional study utilized data extracted from the Ontario Workplace Safety and Insurance Board (WSIB) records indicating concussion/intracranial injury that resulted in days off work in 2004-2005. Analyses of 218 TBI cases revealed that falls were the most common cause of injury, followed by being struck by or against an object. Mechanisms of injury and the temporal profile of injury also varied by age. For instance, a significantly higher proportion of injuries occurred in the mornings for young workers compared to older workers. The results of this study provide important information for prevention of TBI which suggest important age-specific strategies for workers in the construction industry.

  8. ISO in the Construction and Manufacturing Companies: A Case Study from the Construction Industry of Hyderabad and Karachi, Pakistan

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2011-04-01

    Full Text Available Construction industry plays very important role in development of any country. The development of construction industry depends to a larger extent on quality of construction productions and projects. Quality of construction productions and projects is linked with the implementation of QMS (Quality Management System in construction organizations. ISO certification is one of the QMS which has been adopted in manufacturing and construction industry at the global level. The construction companies of developing countries have reaped many advantages from the effective implementation of ISO standards. The rate of adoption of ISO standards has remained slow in the construction sector of some developing countries like Pakistan. This paper presents the literature review of ISO in global construction industry. It highlights the advantages, disadvantages and barriers faced by construction companies in the implementation of ISO standards. This study also investigates the level of adoption of ISO standards in construction and manufacturing companies of Pakistan through a questionnaire survey. It presents the comparison of ISO standards\\\\\\' adoption in both construction and manufacturing sectors. The paper puts forward some suggestions and recommendation for the better adoption and improvement of ISO implementation in the construction sector of Pakistan. This study emphasizes that construction companies of Pakistan should learn from the benefits reaped by the construction companies of developed countries and take appropriate measures for implementing ISO standards. It also suggests that public sector clients should make it obligatory for the contractors and consultants to have ISO certification before awarding the works in order to enhance the the adoption of ISO standards in construction sector.

  9. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    Science.gov (United States)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  10. The selection of disposition of precast concrete industrial building

    Directory of Open Access Journals (Sweden)

    Goleš Danica

    2014-01-01

    Full Text Available Design of precast concrete industrial building is a complex iterative procedure by which, from a set of known possible solutions, is found the one, that in optimal way meets the set requirements and limitations. By proper selection of the disposition of the building, number of possible solutions is reduced at an early stage of design. This paper presents the main requirements and limitations faced by the structure of precast concrete industrial building, as well as parameters that can be defined in dispositional solution: dimensions, orientation and position of the object, materials, structural system, geometric characteristics, foundation system, the way of decomposition of the structure to prefabricated elements, their bearings and connections, and others. Special emphasis is given to the proper selection of the parameters of disposition in function of set requirements and constraints. The work is intended for graduates and young engineers, to help them to properly systematize and apply the knowledge gained during education, and select the optimal dispositional solution the exact way.

  11. Y-12 Sustainable Design Principles for Building Design and Construction

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, J. G.

    2008-11-01

    B&W Y-12 is committed to modernizing the Y-12 complex to meet future needs with a sustainable and responsive infrastructure and to integrating sustainability principles and practices into Y-12 work (Y72-001, B&W Y-12 Environmental, Safety and Health Policy). This commitment to sustainability and specifically sustainable design of buildings is also incorporated into Presidential Executive Orders (EO), DOE Orders (DOE O), and goals. Sustainable building design is an approach to design, construct, and operate facilities in an efficient and environmentally sound manner that will produce a healthful, resource-efficient and productive working environment that is inherently protective of the environment. The DOE has established the following 5 Guiding Principles for High Performance Sustainable Building (HPSB), and has issued directives that require Y-12 to incorporate the principles and a number of supporting specific practices and techniques into building design, construction and renovation projects: (1) Employ Integrated Design Principles; (2) Optimize Energy Performance; (3) Protect and Conserve Water; (4) Enhance Indoor Environmental Quality; and (5) Reduce Environmental Impact of Materials. The purpose of this document is to present the required sustainable building principles, practices and techniques, summarize the key drivers for incorporating them into Y-12 projects, and present additional recommendations and resources that can be used to support sustainable buildings to enhance the environmental and economic performance of the Y-12 Complex.

  12. Green building handbook volume 3: Demolish or deconstruct

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2010-11-01

    Full Text Available by the construction industry, the amount of waste can be as high as 15 per cent of all construction products used in a project. Construction products are intermediate products, which are to be incorporated in construction works (notably buildings, but also roads...

  13. Ranking of Delay Factors for Makkah’s Construction Industry

    Directory of Open Access Journals (Sweden)

    Al-Emad Nashwan

    2017-01-01

    Full Text Available This paper presents identification of significant delay factors encountered by Makkah’s construction industry using quantitative approach. A structured questionnaire developed based on literature review was verified through pilot study involved selected construction experts. Questionnaire survey was conducted amongst Makkah construction practitioners include contractors, consultants and project management consultancy. The survey managed to collect 100 valid responses which were used to rank the factors using average index approach. Results of the analysis for 10 most significant factors causing construction delay in Makkah construction industry are Difficulties in financing project by contractor, Poor coordination between parties, Shortage of manpower, Delays in producing design documents, Improper planning and scheduling of the project, Delay in progress payments, Low productivity level of labour, Poor communication between parties, Unqualified workforce and Poor contract management. This finding is helpful to Makkah construction’s community particularly projects’ stakeholders in avoiding potential delay for their future projects.

  14. Positioning and Priorities of Growth Management in Construction Industrialization: Chinese Firm-Level Empirical Research

    Directory of Open Access Journals (Sweden)

    Jingxiao Zhang

    2017-06-01

    Full Text Available The purpose of this research is to quantitatively evaluate the growth phase, position, and priorities of the industrialization policy management of the construction industry at firm level. The goal is to integrate quantitative dynamics into the policy-making process for sustainable policy development in future China. This research proposes an integrated framework, including growth management model and industrial policy evaluation method, to identify the challenges of construction industrialization and policy management. The research applies the mixed system method, which includes entropy method and average score method, to analyze the growth stage and major impact indexes targeting 327 survey samples. The empirical results show that the proposed conceptual framework and policy evaluation method could effectively determine the growth position and directions of the construction industrialization. For verification purpose, the study uses the local industry data from Shaanxi Province, China. The calculation results substantiate that the construction industry is in the middle section of the third growth phase. The comparison of the results from statistical methods shows that the local construction industry still needs substantial effort in policy management to improve its sustainable industrialization level. As countermeasures, the policy priorities should concentrate on: (1 enhancing effective cooperation among universities, research institutions and enterprises; (2 improving actions towards technology transfer into productivity; and (3 encouraging market acceptance of construction industrialization. This research complements the existing literature of policy evaluation of construction industrialization. Moreover, it provides theoretical and operational steps on industry policy evaluation and growth management framework, with accurate and ample data analysis on firm-level survey. Researchers and policy makers can use this research for further

  15. Construction of high-rise buildings in the Far East of Russia

    Science.gov (United States)

    Kudryavtsev, Sergey; Bugunov, Semen; Pogulyaeva, Evgeniya; Peters, Anastasiya; Kotenko, Zhanna; Grigor'yev, Danil

    2018-03-01

    The construction of high-rise buildings on plate foundation in geotechnical conditions of the Russian Far East is a complicated problem. In this respect foundation engineering becomes rather essential. In order to set a firm foundation it is necessary to take into account the pressure distribution at the structure base, in homogeneity of building deformation, which is due to collaborative geotechnical calculations complicated by a number of factors: actual over-placement of soils, the complex geometry of the building under construction, spatial work of the foundation ground with consideration for physical nonlinearity, the influence of the stiffness of the superstructure (reinforced concrete framing) upon the development of foundation deformations, foundation performance (the performance of the bed plate under the building and stairwells), the origination of internal forces in the superstructure with differential settlement. The solution of spatial problems regarding the mutual interaction between buildings and foundations with account of the factors mentioned above is fully achievable via the application of numerical modeling methodology. The work makes a review of the results of high-rise plate building numerical modeling in geotechnical conditions of the Russian Far East by way of the example of Khabarovsk city.

  16. Development of Building Envelope Constructions

    DEFF Research Database (Denmark)

    Tommerup, Henrik Monefeldt; Munch-Andersen, Jørgen; Esbensen, Peter Kjær

    2000-01-01

    It is expected that the heat insulation demands in the Danish Building Regulations will be further increased around 2005, in order to reduce the heating demand and the CO2-emission. A simple increase of the insulation thickness of common wall types seems not to be attractive due to the increased...... effect of the 2-dimensional heat loss, the large wall thickness, and the costs of the wide foundation. Therefore, new types of walls have been developed. It is sought to minimise the total heat loss as well as the material consumption. The target was to come up with new walls for which the construction...

  17. Assessment of natural radiation exposure inside a newly constructed building

    International Nuclear Information System (INIS)

    Shukla, V.K.; Sadasivan, S.; Nambi, K.S.V.; Sundaram, V.K.

    1994-01-01

    Naturally occurring radionuclides in building materials are one of the sources of radiation exposure to the population. Several building materials used for a newly constructed building complex were analysed for 40 K, 238 U radioactivity by gamma ray spectrometry. The external gamma dose inside the complex was evaluated by using the computer code QAD-CGGP. External dose rate was also measured by using scintillation gamma monitor. Calculated and the measured dose rate values are discussed. (author). 11 refs., 2 figs., 2 tabs

  18. Co-operation an competition in the construction industry of the Netherlands

    NARCIS (Netherlands)

    Doree, Andries G.; Holmen, Elsebeth; Caerteling, Jasper; Greenwood, D

    2003-01-01

    In 2002, a Parliamentary Enquiry Committee exposed widespread collusion practices in the Dutch construction industry. The construction industry in the Netherlands is in turmoil and is seen as not living up to the standards that society requires. There seems to be a culture and an environment that

  19. ECO-INNOVATION IN THE BUILDING INDUSTRY IN POLAND

    Directory of Open Access Journals (Sweden)

    Krzysztof Stanisław Zachura

    2016-12-01

    Furthermore, public investor awareness is increasing in the range of introducing sustained development rules, especially in the utilization of green procurement in the building sector, as evidenced by public facilities constructed in the passive and energy efficient standard.

  20. BIM uses for reversible building design

    NARCIS (Netherlands)

    van den Berg, Marc Casper; Durmisevic, Elma; Durmisevic, Elma

    2017-01-01

    The construction industry urgently needs new approaches to design buildings that can be incorporated in the circular economy. Buildings are still predominantly conceived as static structures with one end-of-life option, demolition, which typically results in excessive amounts of waste. To cut waste,

  1. Trends and Opportunities of BIM-GIS Integration in the Architecture, Engineering and Construction Industry: A Review from a Spatio-Temporal Statistical Perspective

    Directory of Open Access Journals (Sweden)

    Yongze Song

    2017-12-01

    Full Text Available The integration of building information modelling (BIM and geographic information system (GIS in construction management is a new and fast developing trend in recent years, from research to industrial practice. BIM has advantages on rich geometric and semantic information through the building life cycle, while GIS is a broad field covering geovisualization-based decision making and geospatial modelling. However, most current studies of BIM-GIS integration focus on the integration techniques but lack theories and methods for further data analysis and mathematic modelling. This paper reviews the applications and discusses future trends of BIM-GIS integration in the architecture, engineering and construction (AEC industry based on the studies of 96 high-quality research articles from a spatio-temporal statistical perspective. The analysis of these applications helps reveal the evolution progress of BIM-GIS integration. Results show that the utilization of BIM-GIS integration in the AEC industry requires systematic theories beyond integration technologies and deep applications of mathematical modeling methods, including spatio-temporal statistical modeling in GIS and 4D/nD BIM simulation and management. Opportunities of BIM-GIS integration are outlined as three hypotheses in the AEC industry for future research on the in-depth integration of BIM and GIS. BIM-GIS integration hypotheses enable more comprehensive applications through the life cycle of AEC projects.

  2. A Production Model for Construction: A Theoretical Framework

    Directory of Open Access Journals (Sweden)

    Ricardo Antunes

    2015-03-01

    Full Text Available The building construction industry faces challenges, such as increasing project complexity and scope requirements, but shorter deadlines. Additionally, economic uncertainty and rising business competition with a subsequent decrease in profit margins for the industry demands the development of new approaches to construction management. However, the building construction sector relies on practices based on intuition and experience, overlooking the dynamics of its production system. Furthermore, researchers maintain that the construction industry has no history of the application of mathematical approaches to model and manage production. Much work has been carried out on how manufacturing practices apply to construction projects, mostly lean principles. Nevertheless, there has been little research to understand the fundamental mechanisms of production in construction. This study develops an in-depth literature review to examine the existing knowledge about production models and their characteristics in order to establish a foundation for dynamic production systems management in construction. As a result, a theoretical framework is proposed, which will be instrumental in the future development of mathematical production models aimed at predicting the performance and behaviour of dynamic project-based systems in construction.

  3. Construction in Occupied Spaces

    Directory of Open Access Journals (Sweden)

    Ward Andrew E.

    2017-06-01

    Full Text Available Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  4. Construction in Occupied Spaces

    Science.gov (United States)

    Ward, Andrew E.; Azhar, Salman; Khalfan, Malik

    2017-06-01

    Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  5. Multicriteria Analysis of Assembling Buildings from Steel Frame Structures

    Science.gov (United States)

    Miniotaite, Ruta

    2017-10-01

    Steel frame structures are often used in the construction of public and industrial buildings. They are used for: all types of slope roofs; walls of newly-built public and industrial buildings; load bearing structures; roofs of renovated buildings. The process of assembling buildings from steel frame structures should be analysed as an integrated process influenced by such factors as construction materials and machinery used, the qualification level of construction workers, complexity of work, available finance. It is necessary to find a rational technological design solution for assembling buildings from steel frame structures by conducting a multiple criteria analysis. The analysis provides a possibility to evaluate the engineering considerations and find unequivocal solutions. The rational alternative of a complex process of assembling buildings from steel frame structures was found through multiple criteria analysis and multiple criteria evaluation. In multiple criteria evaluation of technological solutions for assembling buildings from steel frame structures by pairwise comparison method the criteria by significance are distributed as follows: durability is the most important criterion in the evaluation of alternatives; the price (EUR/unit of measurement) of a part of assembly process; construction workers’ qualification level (category); mechanization level of a part of assembling process (%), and complexity of assembling work (in points) are less important criteria.

  6. Lean transformation in a modular building company: a case for implementation

    NARCIS (Netherlands)

    Yu, H.; Al-Hussein, M.; Al-Jibouri, Saad H.S.; Telyas, A.

    2013-01-01

    Encouraged by the remarkable productivity improvements in the manufacturing sector, the construction industry has a long history of trying to garner the benefits of manufacturing technologies. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over

  7. Project quality management critical success factors for buildings

    CERN Document Server

    Low, Sui Pheng

    2014-01-01

    The book presents the development of the Construction Quality Assessment System (CONQUAS), Singapore’s de facto quality performance measurement system, explains the application of the Quality Management System (QMS) to manage CONQUAS and identifies 33 critical success factors (CSFs) for achieving high CONQUAS scores. Through CONQUAS, the reader benefits from understanding how the Singapore government developed and implemented the first objective system for measuring what many building professionals have perceived to be elusive quality standards in the construction industry. The book presents both the theoretical concepts as well as the practical aspects to achieving strategic Project Quality Management that is anchored on the CSFs to building best practices. To realistically reflect the practical aspects and challenging issues faced by stakeholders in the construction industry, questionnaire surveys were conducted with building professionals to distinguish the importance level and extent of adoption of the ...

  8. Information support of monitoring of technical condition of buildings in construction risk area

    Science.gov (United States)

    Skachkova, M. E.; Lepihina, O. Y.; Ignatova, V. V.

    2018-05-01

    The paper presents the results of the research devoted to the development of a model of information support of monitoring buildings technical condition; these buildings are located in the construction risk area. As a result of the visual and instrumental survey, as well as the analysis of existing approaches and techniques, attributive and cartographic databases have been created. These databases allow monitoring defects and damages of buildings located in a 30-meter risk area from the object under construction. The classification of structures and defects of these buildings under survey is presented. The functional capabilities of the developed model and the field of it practical applications are determined.

  9. The Use Potential of Traditional Building Materials for the Realization of Structures by Modern Methods of Construction

    Directory of Open Access Journals (Sweden)

    Spišáková Marcela

    2015-11-01

    Full Text Available The sustainable building has taken off in recent years with many investors looking for new and different methods of construction. The traditional building materials can be made out of natural materials, while others can help to lower energy costs of the occupant once built. Regardless of what the goal of the investor is, traditional building materials and their use is on the rise. The submitted paper provides an overview of natural building materials and possible modern building systems using these construction materials. Based on the questionnaire survey is defined the use potential of traditional building materials for the realization of the construction by methods of modern constructions and then are determined the drivers and barriers of traditional materials through using modern methods of construction. Considering the analysis of the achieved results, we can identify the gaps in the construction market in Slovakia and also to assess the perception of potential investors in the field of traditional building materials use, which is the purpose of submitted paper.

  10. THE EVOLUTION OF THE DESIGN AND CONSTRUCTION OF MASONRY BUILDINGS IN THE UNITED STATES

    Directory of Open Access Journals (Sweden)

    Richard E. Klingner

    2012-12-01

    Full Text Available In this paper, the process used to develop building codes in the United States of America (USA is summarized, with emphasis on masonry. Masonry materials used in the USA are discussed. Types of masonry construction in the USA are reviewed, addressing historical as well as modern masonry. Current non-structural and structural applications of masonry in the USA are reviewed. Historical development of masonry codes in the USA is summarized, with emphasis on the current Masonry Standards Joint Committee (MSJC Code and Specification. Future trends in that document are predicted. The paper closes with a list of challenges to the masonry industry, and a list of focused research topics intended to meet those challenges.

  11. Modularization in the construction industry using a top-down approach

    DEFF Research Database (Denmark)

    Kudsk, Anders; Hvam, Lars; Thuesen, Christian

    2013-01-01

    Throughout the last centuries, the manufacturing industry has experienced great improvements in efficiency and cost reductions, but the same improvements have not taken place in the construction industry. Based on the principles of mass customization that are known from the manufacturing industry...

  12. EVALUATION OF WOOD PERFORMANCE IN BUILDING CONSTRUCTION THROUGH SYSTEM APPROACH

    Directory of Open Access Journals (Sweden)

    Ricardo Pedreschi

    2005-09-01

    Full Text Available Building construction is considered to be the leading market for the wood industry, in developed and developingcountries. The greatest amount of wood produced in Brazil is consumed as firewood and energy, followed by production of celluloseand third as machined wood. The use of wood from planted forests can be increased. This would lead to a better use of naturalresources, and consequently to an increased sustainability of forest activity in many regions of the country. The performance of woodcan be observed from many different insights: symbolic performance, technical performance and economical performance, conductedby the method of systems approach to architecture. Usages of wood related to the performances of the material, with the redefinitionof parameters of use, elaborating a new culture linked to new technologies were outlined. This work diagnosed the usage of wood inbuilding construction based in system analysis. Through an opinion research related to the acceptation of the use of wood we observethe possibilities of utilization according to physical and mechanical proprieties, aesthetics and appearance performance and postoccupation.According to the results obtained related to the culture and knowledge about the use of wood from planted forest, it canconclude that there is not enough knowledge in this area, and it is, therefore, necessary to create an information system forprofessionals and for people in general.

  13. Solar building construction. Special edition of the journal 'Sonnenenergie'; Solares Bauen. Sonderheft der Sonnenenergie

    Energy Technology Data Exchange (ETDEWEB)

    Rust, A. (comp.)

    2003-10-01

    This special issue of October 2003 reviews solar architecture, planning, applications, technology, market and knowledge. Subjects: Falkenweg housing development; Q-Cells solar factory; Modehaus Zara building; Haus Westermayr McCready building; Federal Environmental Office building, Dessau; 'Haus im Himmel' building; NRW state representatives building in Berlin; Zero-emission building 'Sunny Woods', Zurich; Hellerau workshop buildings, Dresden; HOCHTIEF PRISMA Haus building, Frankfurt; Solar government buildings, Berlin; SOLARBAU programme; Energy supply concepts based on photovoltaic power supply; Solar cooling; Photovoltaic lamellas; Solar building construction; Solar contracting; Solar building modernisation; Integrated PV systems in Europe; Living in passive buildings; Funding programmes for renewable energy sources and building construction. (orig./AKF)

  14. Evaluation for rigidity of box construction of nuclear reactor building

    International Nuclear Information System (INIS)

    Yamakawa, Tetsuo

    1979-01-01

    A huge box-shaped structure (hereafter, called box construction) of reinforced concrete is presently utilized as the reactor building structure in nuclear power plants. Evaluation of the rigidity of the huge box construction is required for making a vibration analysis model of nuclear reactor buildings. It is necessary to handle the box construction as the plates to which the force in plane is applied. This paper describes that the bending theory in elementary beam theory is equivalent to a peculiar, orthogonally anisotropic plate, the shearing rigidity and film rigidity in y direction of which are put to infinity and the Poisson's ratio is put to zero, viewed from the two-dimensional theory of elasticity. The form factor of 1.2 for shearing deformation in rectangular cross section was calculated from the parabolic distribution of shearing stress intensity, and it is the maximum value. The factor is equal to 1.2 for slender beams, but smaller than 1.2 for short and thick beams, having tendency to converge to 1.0. The non-conformity of boundary conditions regarding the shearing force at the both ends of cantilevers does not affect very seriously the evaluation of shearing rigidity. From the above results, it was found that the application of the theory to the box construction was able to give the rigidity evaluation with sufficient engineering accuracy. The theory can also be applied to the evaluation of tube type ultrahigh buildings. (Wakatsuki, Y.)

  15. Property and Construction Professions: The Views of Industry Leaders

    Directory of Open Access Journals (Sweden)

    Anthony Mills

    2012-11-01

    Full Text Available The role of professionals has changed significantly, and sotoo should the role of professional societies. The future isvery unclear, and it is likely that professional societies willcontinue to change and adapt. But what is their role today;is it to provide leadership, serve their members, or promotetheir professions? These questions were put to a numberof construction industry leaders to seek their views. Thepresidents of three professional institutes and a governmentregulator for the construction industry were approachedand their opinions recorded. Each interviewee was chosenbecause of their leadership role within the property andconstruction industries. Using an informal exploratoryinterview approach each respondent discussed issuesfacing their professional society. The results show thatindemnity insurance, continuing professional development,and public recognition were key concerns.

  16. Innovative quality management practices in the Dutch construction industry

    NARCIS (Netherlands)

    Bossink, B.A.G.

    2002-01-01

    Quality management practices do support the management of strategically important innoυation processes. This conclusion is based on empirical research in the Dutch construction industry. A large-scale innovative construction project is intensively studied during a three-year period. The quality

  17. Lessons learned in the construction industry Extracting collaborative components

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev; Rasmussen, Arne P.; Faber, Lene

    2017-01-01

    Significant literature has been dedicated to research on partnering in construction, and a plethora of underlying theories and industrial practices on partnering application have been reported. The aim is to analyze and summarize the research trend of partnering research from leading construction...

  18. Correlation of Safety Culture Attributes in Construction Industry

    Directory of Open Access Journals (Sweden)

    Pervez Shaikh

    2013-07-01

    Full Text Available The importance of construction industry can not be overemphasized because it is one of the biggest contributors toward economic activities of a country. It employs a countable number of workforce and it is prone to accidents, incidents, hazards and disasters, therefore, the safety factor is equally important. The current research explores safety culture in the perspective of its important attributes. The EFQM (European Foundation for Quality Management is taken as the bases for finding the ways and means of safety culture improvement of the construction industry. The correlation of pattern of responses is found for every attribute of the safety culture and the interrelationships and strengths are worked out to detect the involvement of the attribute.

  19. Advocating mindset for cooperative partnership for better future of construction industry

    Science.gov (United States)

    Omar, Datuk Wahid

    2017-11-01

    Construction industry players are known for their low acceptance on the changes. Hence, it is identified that the biggest challenge in the industry is changing the mindset. This paper highlights the importance of transformation in shaping for better future of the industry. Transformation favors innovation and progressive development in the industry and specifically in managing a project. Thus changes in mindset of players with an eye to the future and focus on what is coming are paramount in inculcating the transformation culture in construction eco-system. The key to the success of transformation is the collaborative and cooperative partnering which ensuring the performance of every stage of project delivery. The collaborative, cooperative and concerted effort of all parties involved in the project creates mutual understanding on mission and vision of project. Adopting healthy and harmonious project culture, implementing innovative procurement that emphasis on fair risk sharing should be a working culture. This cooperative partnership should be the future of the project undertaking in the construction industry.

  20. Appraisal of systematic training practices by building construction ...

    African Journals Online (AJOL)

    It was observed that 89.65% and 91.38% of the respondents agree that management and technical staff training is only embarked on when needed: that ITF ... of building construction workers serves a means of maintaining standards and ensuring that those who are newly engaged into existing jobs and practices are able ...

  1. Strategic Outsourcing in the German Engine Building Industry

    DEFF Research Database (Denmark)

    Gretzinger, Susanne

    2008-01-01

    Outsourcing is an organizational measure that changesthe ressource dependencies of a Company. In this paper, a framework is developed from the perspective of the ressource dependence approach to explain strategic outsourcing in the German engine building industry. On the basis of the NIFA panel...

  2. Design and construction of the Portable Industrial X-Ray Equipment

    International Nuclear Information System (INIS)

    Nguyen Phuc; Nguyen Van Si; Le Tien Quan; Trinh Anh Tuan; Nguyen Manh Hung; Trinh Dinh Tuong

    2011-01-01

    The main purposes of the project are the supporting to design and construction of the Portable Industrial X-Ray Equipment; with the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA. The Equipment is composed of control unit, X-ray generator, and power cable, connection cable. X-ray generator is assembling construction X-ray tube, H.V transformer together with gas insulation (SF6) are sealed up in aluminum bucked cabinet, fan and heat-sink are mounted in the end of X-ray generator as cooling, SF6 is a gas electrical performance to H.V. Alarm lamp is used to warn, flashing, show generating X-ray. Control unit is box construction. Four printed circuit boards (PCB) and electronic device are mounted in it. All operating buttons switches and displays are equipped on the panel. We have completed to design and construct the Portable Industrial X-Ray Equipment; and have tested the electronic parameters of all test points and the main parameters of equipment (the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA). We also have successful used the Portable Industrial X-Ray Equipment to evaluate the welds in industry. (author)

  3. Vistas of the post-industrial city.

    Directory of Open Access Journals (Sweden)

    Malcolm Miles

    2000-02-01

    prosperity, as redundant industrial buildings are re-coded as sites of culture. But if the post-industrial city is a post-modern site of abundance, its benefits are unevenly distributed; centres of affluence construct margins of deprivation. Just as public art lent a veneer of cultural value to urban development in the 1980s, so the re-coding of industrial buildings as sites of culture in the ’90s contributes to a continuing aestheticisation of the city which affirms a dominant spatial order. What strategies, then, are appropriate for art in post-industrial cities?

  4. Building a Circular Future

    DEFF Research Database (Denmark)

    Merrild, Heidi

    2016-01-01

    Natural resources are scarce and construction accounts for 40 percent of the material and energy consumption in Europe. This means that a switch to a circular future is necessary. ’Building a Circular Future’ maps out where we are, where we are going, and what is needed for this conversion to take...... on the project’s strategies. The financial result is a profit of DKK 35 million on the structure alone in the demolition of a building built for the cost of DKK 860 million. The total potential for the whole building, calculated in projected material prices, is estimated to be up to 16% of the total construction...... of the circular strategies is not only in the future. Increased flexibility, optimized operation and maintenance, as well as a healthier building, is low-hanging fruit that can be harvested today. The project’s principles can be implemented in industrialized construction in a large scale today. That is proven...

  5. Industrialised Building System in Malaysia: A Review

    Directory of Open Access Journals (Sweden)

    Othuman Mydin M.A.

    2014-03-01

    Full Text Available The construction industry in Malaysia is experiencing a migration from conventional methods to a more systematic and mechanised method known as the Industrialised Building System (IBS. Each state in Malaysia is currently examining the developments of the IBS and its potential to overcome the shortages of housing accommodations in this country. The Malaysian government, involved through its agency, the Construction Industry Development Board (CIDB has been persistently pushing the construction industry to utilise of the IBS method of construction since the year 2003. It is a part of an incorporated endeavour to further improve the aptitude, potential, effectiveness and competitiveness of the industry as well as to diminish the industry’s dependence on foreign labour. This is also an attempt in the Malaysian construction industry to encourage positive inroads in matters associated to construction-site safety with regards to a working environment which is cleaner, more convenient and more organized.

  6. Technological aspects of lift-slab method in high-rise-building construction.

    Science.gov (United States)

    Gaidukov, Pavel V.; Pugach, Evgeny M.

    2018-03-01

    The utilization efficiency of slab lifting technology for high-rise-building construction is regarded in the present article. The main problem of the article is organizing technology abilities indication, which proves the method application possibility. There is the comparing of lifting technologies and sequential concrete-frame extension, as follows: the first one: the parameters are defined, and the second one: the organizational model is executed. This model defines borders of the usage methods, as well. There is the mathematic model creating, which describes boundary conditions of the present technologies usage. This model allows to predict construction efficiency for different stored-number buildings.

  7. Thermal Performance of Typical Residential Building in Karachi with Different Materials for Construction

    Directory of Open Access Journals (Sweden)

    Nafeesa Shaheen

    2016-04-01

    Full Text Available This research work deals with a study of a residential building located in climatic context of Karachi with the objective of being the study of thermal performance based upon passive design techniques. The study helps in reducing the electricity consumption by improving indoor temperatures. The existing residential buildings in Karachi were studied with reference to their planning and design, analyzed and evaluated. Different construction?s compositions of buildings were identified, surveyed and analyzed in making of the effective building envelops. Autodesk® Ecotect, 2011 was used to determine indoor comfort conditions and HVAC (Heating, Ventilation, Air-Conditioning and Cooling loads. The result of the research depicted significant energy savings of 38.5% in HVAC loads with proposed building envelop of locally available materials and glazing.

  8. Sustainable hemp-based composites for the building industry application

    Science.gov (United States)

    Schwarzova, Ivana; Stevulova, Nadezda; Junak, Jozef; Hospodarova, Viola

    2017-07-01

    Sustainability goals are essential driving principles for the development of innovative materials in the building industry. Natural plant (e.g. hemp) fibers represent an attractive alternative as reinforcing material due to its good properties and sustainability prerequisites. In this study, hemp-based composite materials, designed for building application as non-load bearing material, providing both thermal insulation and physico-mechanical properties, are presented. Composite materials were produced by bonding hemp hurds with a novel inorganic binder (MgO-based cement) and then were characterized in terms of physical properties (bulk density, water absorption), thermal properties (thermal conductivity) and mechanical properties (compressive and tensile strength). The composites exhibited promising physical, thermal and mechanical characteristics, generally comparable to commercially available products. In addition, the hemp-based composites have the advantage of a significantly low environmental impact (thanks to the nature of both the dispersed and the binding phase) and no negative effects on human health. All things considered, the composite materials seem like very promising materials for the building industry application.

  9. Twenty third scientific conference on research-scientific problems of constructing mine buildings and metallurgical plants

    Energy Technology Data Exchange (ETDEWEB)

    Swiadrowski, W

    1978-01-01

    Annual conference was held in Krynica from 16-23 September 1977. One hundred and nineteen papers were delivered, of these 24 papers were on mine buildings. It was noted that damage caused by underground coal mining is prevalent and characterized by a tendency to increase. In the middle of the 1970s damages paid by mines (mainly by coal mines) reached 5 billion zlotys yearly. Damages which were not compensated, and social cost of mining damages are not included in the calculation. The following problems were discussed: interaction between foundations of buildings with ground in areas affected by deformations; influnce of underground coal mining on properties of soil; improving construction of large industrial plants located on grounds characterized by surface deformations; influence of underground coal mining on deformations of walls of sedimentation tanks; complex utilization of mined deposits in the Upper Silesian basin, Rybnik basin and in the Lublin black coal basin (coal and other minerals). (In Polish)

  10. Innovation and sectoral change in construction: The role of the industry paradigm and industry leaders

    NARCIS (Netherlands)

    Pries, F.; Vrijhoef, R.

    2004-01-01

    The construction industry appears to have serious problems to innovate effectively and incorporate innovative knowledge into firms’ businesses, despite the innovation potential and capacities of the industry. In the last decades several initiatives have been taken and many approaches have been

  11. Sustainable construction - the standard for all public building?

    Energy Technology Data Exchange (ETDEWEB)

    Handyside, R. [Richard Handyside Construction Resources (United Kingdom)

    2002-01-01

    This article argues for the need for foresight and planning to achieve sustainable development in the construction of public buildings. Reasons why sustainable development fails are highlighted, and the key factors that go to make a development sustainable are listed and involve the choice and layout of the site, site services, the fitting of spaces to the required purpose, the arrangement of rooms to achieve maximum use of natural light, heat and air, and the choice of construction materials and finishes. The balancing of short and long-term costs, and the use of life-cycle costs in every project are discussed.

  12. On-site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures

    Directory of Open Access Journals (Sweden)

    Serdar Durdyev

    2011-09-01

    Full Text Available Productivity is key to the survival and growth of any organisation, industry or nation. Some factors constrain the achievement of the set project objectives in the New Zealand building and construction industry and are responsible for the reported steady decline of productivity and performance. This study aims to identify the key constraints to on-site labour productivity and improvement measures. Using the descriptive survey method, views of some project managers, contractors and subcontractors in New Zealand were canvassed via pilot interviews and questionnaire surveys at the qualitative and quantity data gathering stages, respectively. Multi-attribute technique was used to analyse the quantitative data. Results showed that the key external constraints to on-site labour productivity comprise, in order of decreasing impact, statutory compliance, unforeseen events and wider external dynamics. The internal constraints, which contribute 67 percent of the onsite productivity issues, comprise reworks, level of skill and experience of the workforce, adequacy of method of construction, buildability issues, and inadequate supervision and coordination. . The factors underlying each broad category of external and internal constraints are reported. The relative levels of impact of the identified constraints are expected to guide the project team in addressing the constraints in a cost-effective manner.

  13. The Dutch Construction Industry : An Overview and Its Use of Performance Information

    NARCIS (Netherlands)

    Van de Rijt, J.; Hompes, M.; Santema, S.C.

    2010-01-01

    This paper gives an overview of the Dutch Construction industry and elaborates further on its use of performance information. After giving an overview of the Dutch construction industry depicting size, major contractors, growth, profitability, value added, costs, productivity, this section is

  14. Technology Solutions Case Study: Design Guidance for Passive Vents in New Construction, Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-02-12

    In an effort to improve indoor air quality in high-performance, new construction, multifamily buildings, dedicated sources of outdoor air are being implemented. Passive vents are being selected by some design teams over other strategies because of their lower first costs and operating costs. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings constructed eight steps, which outline the design and commissioning required for these passive vents to perform as intended.

  15. Building Green: Construction for the 21st Century

    Science.gov (United States)

    Phillipson, Todd

    2012-01-01

    At Jefferson County Vocational School (JCVS) in Bloomingdale, Ohio, students get a lesson on building green with the construction of a home in the school's subdivision. The home is being built using Energy Star guidelines so that it may be identified as an Energy Star home. The goal for the Jefferson County Vocational Schools Board of Education…

  16. The Unidentified Value of IT in the Construction Industry

    DEFF Research Database (Denmark)

    Andresen, Jan Lambrecht

    2000-01-01

    A questionnaire survey was completed in spring1999 about the evaluation of IT in the Danish construction industry. This paper presents some of the results found in the analysis of the survey. It is found that few companies have a written IT strategy and in those who have, the practicality...... of their IT strategy is generally low. Most IT evaluation is done before the investment is made using primarily oral guidelines and subjective arguments. CAD systems are the most evaluated. In general it is found that the IT evaluations completed by companies in the construction industry are unsophisticated compared...

  17. THE MODEL CONSTRUCTIONS OF PRICE FORMING OF BUILDING MATERIALS MANUFACTURE IN BASHKORTOSTAN

    Directory of Open Access Journals (Sweden)

    H.N. Gizatullin

    2007-06-01

    Full Text Available In this work attempt has been done analyze the influence of the environmental factors, as outward, as inside to choice of the strategy and the pricing of the industry of the building materials of Bashkortostan. This article examines the competitive surroundings of enterprises and branches in a aspect of the regional market of the building industry’s production. The evaluation of the compatibility is given of the price and competitive strategy. As a result of the research and pricing majority of industry’s enterprises had no official document stating their per pose in a pricing area. In reason of analysis the general situation of the industry building materials the enterprises of Bashkortostan, the conception of pricing is determined on functional level.

  18. Worksite element as causes of occupational accidents and illnesses in Malaysian residential construction industry

    Science.gov (United States)

    Hafiidz, J. Mohd; Arifin, K.; Aiyub, K.; Razman, M. R.; Samsurijan, M. S.; Syakir, M. I.

    2017-09-01

    Construction industry is an important sector that contributes to the development of economy and socioeconomy in Malaysia. It is a vital component in achieving the developed country status. However, fatalities in the Malaysian construction industry are a critical problem. Number of fatalities in this industry is the highest compared to other industries registered in Malaysia under the investigation of Department of Occupational Safety and Health (DOSH). Worksite element (worksite conditions, poor site management, construction tasks, and equipment & materials) was identified as one category of causes of occupational accidents and illnesses in Malaysian construction industry. The main objective of this study is to understand the perception of local construction personnel in terms of worksite element as causes of occupational accidents and illnesses in Malaysian residential construction industry. 13 housing projects that were registered with Ministry of Urban Wellbeing, Housing and Local Government and being permitted to perform construction work in 2012 were selected in Pulau Pinang to be studied using questionnaire survey. Worksite condition and poor site management was perceived as the most significant with the mean values of 3.68 and 3.61 respectively.

  19. Construction and demolition waste indicators.

    Science.gov (United States)

    Mália, Miguel; de Brito, Jorge; Pinheiro, Manuel Duarte; Bravo, Miguel

    2013-03-01

    The construction industry is one of the biggest and most active sectors of the European Union (EU), consuming more raw materials and energy than any other economic activity. Furthermore, construction waste is the commonest waste produced in the EU. Current EU legislation sets out to implement construction and demolition waste (CDW) prevention and recycling measures. However it lacks tools to accelerate the development of a sector as bound by tradition as the building industry. The main objective of the present study was to determine indicators to estimate the amount of CDW generated on site both globally and by waste stream. CDW generation was estimated for six specific sectors: new residential construction, new non-residential construction, residential demolition, non-residential demolition, residential refurbishment, and non-residential refurbishment. The data needed to develop the indicators was collected through an exhaustive survey of previous international studies. The indicators determined suggest that the average composition of waste generated on site is mostly concrete and ceramic materials. Specifically for new residential and new non-residential construction the production of concrete waste in buildings with a reinforced concrete structure lies between 17.8 and 32.9 kg m(-2) and between 18.3 and 40.1 kg m(-2), respectively. For the residential and non-residential demolition sectors the production of this waste stream in buildings with a reinforced concrete structure varies from 492 to 840 kg m(-2) and from 401 to 768 kg/m(-2), respectively. For the residential and non-residential refurbishment sectors the production of concrete waste in buildings lies between 18.9 and 45.9 kg/m(-2) and between 18.9 and 191.2 kg/m(-2), respectively.

  20. Causes of Payment Problems in the New Zealand Construction Industry

    Directory of Open Access Journals (Sweden)

    Thanuja Ramachandra

    2015-03-01

    Full Text Available Payment delays and losses persist in the construction industry and continue to be a key concern to industry practitioners. Therefore an exploration of the key causes of payment delays and losses is undertaken in this study with the ultimate objective of seeking mitigating solutions. The study adopted a survey approach using an online questionnaire, administered to practitioners from the New Zealand construction industry, comprising consultants, head contractors and subcontractors. The data obtained was analysed using inferential statistical techniques, including comparing means and factor analysis. Factor analysis enabled clustering of the inter-related causes of payment delays and losses in order to find reduced number of causes. Accordingly, the study found that payment problems mainly relate to contractual issues, financial strength of industry players, disputes, short-comings of payment processes and ‘domino effects’. Among them, the financial strength of critical industry players was considered central to payment problems. The study concludes that any solution to these problems must address these primary causes, as a rational starting point. Thus procuring a feasible form of financial security at the outset of a project, and the pre-qualification of the financial status of critical project participants, were found to be significant in the mitigation of construction payment risks. Paper Type: Research article

  1. Establishing a Commercialization Model for Innovative Products in the Residential Construction Industry

    OpenAIRE

    McCoy, Andrew Patton

    2007-01-01

    Throughout the world, innovation is viewed as a critical factor in the future health of the construction industry. There is universal interest in successful commercialization of innovative construction products. This thesis focuses on the US construction industry's ability to successfully commercialize innovative products. US small, limited-resource innovators will be key players in this success. Recent failures of entrepreneurial business ventures in the commercialization of such product...

  2. The Nature of Payment Problems in the New Zealand Construction Industry

    Directory of Open Access Journals (Sweden)

    Thanuja Ramachandra

    2011-06-01

    Full Text Available Delay and loss of payment is a serious problem in the construction industry of many countries. These affect the cash flow of contractors which is critical to meeting their financial obligations. Payment defaults by the principal leads to insolvency of contractors and in turn other parts of the project chain. In recognition of some of these problems, most countries have established payment-specific construction industry legislation and other contractual measures to mitigate the problems, but nevertheless the problem persists. In this context, the paper examines the nature of payment problems in the construction industry in New Zealand. It is part of a larger study, that seeks solutions to payment losses in the construction industry.The study uses two approaches; an analysis of liquidators’ reports, and an analysis of court cases involving payment disputes to determine the magnitude of payment problems on construction parties. The findings are presented using simple descriptive and interpretive analyses. The study finds that trade creditors are impacted negatively (payment delays and losses by the liquidation of property developers, general construction and construction trade companies. 75% of trade creditors are unable to be paid fully by these categories of construction companies after liquidation proceedings. Liquidation proceedings take an average 18 months before they are finalised. The analysis of court cases found that 80% of payment disputes are between principals and contractors; with considerably significant percentage of disputes resulting in outright loss of payments. Only 40% of the cases are successful, in which case claimants are able to fully recover the amount in dispute. Payment losses are more prevalent in liquidation than delays and unlike in legal disputes, there is no security for those losses. The study finds that construction parties use remedies contained in the security of payment provisions within standard conditions

  3. The Nature of Payment Problems in the New Zealand Construction Industry

    Directory of Open Access Journals (Sweden)

    Thanuja Ramachandra

    2011-06-01

    Full Text Available Delay and loss of payment is a serious problem in the construction industry of many countries. These affect the cash flow of contractors which is critical to meeting their financial obligations. Payment defaults by the principal leads to insolvency of contractors and in turn other parts of the project chain. In recognition of some of these problems, most countries have established payment-specific construction industry legislation and other contractual measures to mitigate the problems, but nevertheless the problem persists. In this context, the paper examines the nature of payment problems in the construction industry in New Zealand. It is part of a larger study, that seeks solutions to payment losses in the construction industry.The study uses two approaches; an analysis of liquidators’ reports, and an analysis of court cases involving payment disputes to determine the magnitude of payment problems on construction parties. The findings are presented using simple descriptive and interpretive analyses. The study finds that trade creditors are impacted negatively (payment delays and losses by the liquidation of property developers, general construction and construction trade companies. 75% of trade creditors are unable to be paid fully by these categories of construction companies after liquidation proceedings. Liquidation proceedings take an average 18 months before they could be finalised. The analysis of court cases found that 80% of payment disputes are between principals and contractors; with considerably significant percentage of disputes resulting in outright loss of payments. Only 40% of the cases are successful, in which case claimants are able to fully recover the amount in dispute. Payment losses are more prevalent in liquidation than delays and unlike in legal disputes, there is no security for those losses. The study finds that construction parties use remedies contained in the security of payment provisions within standard

  4. U.S. Department of Energy Commercial Reference Building Models of the National Building Stock

    Energy Technology Data Exchange (ETDEWEB)

    Deru, M.; Field, K.; Studer, D.; Benne, K.; Griffith, B.; Torcellini, P.; Liu, B.; Halverson, M.; Winiarski, D.; Rosenberg, M.; Yazdanian, M.; Huang, J.; Crawley, D.

    2011-02-01

    The U.S. Department of Energy (DOE) Building Technologies Program has set the aggressive goal of producing marketable net-zero energy buildings by 2025. This goal will require collaboration between the DOE laboratories and the building industry. We developed standard or reference energy models for the most common commercial buildings to serve as starting points for energy efficiency research. These models represent fairly realistic buildings and typical construction practices. Fifteen commercial building types and one multifamily residential building were determined by consensus between DOE, the National Renewable Energy Laboratory, Pacific Northwest National Laboratory, and Lawrence Berkeley National Laboratory, and represent approximately two-thirds of the commercial building stock.

  5. Predictors for the Success and Survival of Entrepreneurs in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Zahidy Abd-Hamid1

    2015-05-01

    Full Text Available A review of entrepreneurship literature suggests that entrepreneurial activities are the most important drivers for economic growth and corporate success, regardless of size, age or industry. Nevertheless, so far, only a few studies, if any, have considered entrepreneurship as a success factor for construction enterprises, although the importance of the construction industry to the nation’s economic growth is significant. This paper reports a conceptual framework for formulating the success and survival factors of entrepreneurs in the construction industry. It also integrates four major perspectives in entrepreneurship: entrepreneurial orientation, entrepreneurial organization, entrepreneurial competencies and entrepreneurial environment.

  6. Synthetic building materials for transport buildings and structures

    Science.gov (United States)

    Gerasimova, Vera

    2017-10-01

    The most effective building materials account for the highest growth not only in construction of residential and public buildings, but also other capital projects including roadways, bridges, drainage, communications and other engineering projects. Advancement in the technology of more efficient and ecologically responsible insulation materials have been a priority for safety, minimal maintenance and longevity of finished construction projects. The practical use of modern building materials such as insulation, sound reduction and low energy consumption are a benefit in cost and application compared to the use of outdated heavier and labor-intensive materials. The most efficient way for maximizing insolation and sound proofing should be done during the design stages of the project according to existing codes and regulations that are required by Western Government. All methods and materials that are used need to be optimized in order to reach a high durability and low operational and maintenance cost exceeding more than 50 years of the life of the building, whether it is for public, industrial or residential use. Western construction techniques and technologies need to be applied and adapted by the Russian Federation to insure the most productive successful methods are being implemented. The issues of efficient insulation materials are outlined in this article.

  7. System Dynamics Model and Simulation of Employee Work-Family Conflict in the Construction Industry

    Science.gov (United States)

    Wu, Guangdong; Duan, Kaifeng; Zuo, Jian; Yang, Jianlin; Wen, Shiping

    2016-01-01

    The construction industry is a demanding work environment where employees’ work-family conflict is particularly prominent. This conflict has a significant impact on job and family satisfaction and performance of employees. In order to analyze the dynamic evolution of construction industry employee’s work-family conflict between work and family domains, this paper constructs a bi-directional dynamic model framework of work-family conflict by referring to the relevant literature. Consequently, a system dynamics model of employee’s work-family conflict in the construction industry is established, and a simulation is conducted. The simulation results indicate that construction industry employees experience work interference with family conflict (WIFC) levels which are significantly greater than the family interference with work conflict (FIWC) levels. This study also revealed that improving work flexibility and organizational support can have a positive impact on the satisfaction and performance of construction industry employees from a work and family perspective. Furthermore, improving family support can only significantly improve employee job satisfaction. PMID:27801857

  8. System Dynamics Model and Simulation of Employee Work-Family Conflict in the Construction Industry.

    Science.gov (United States)

    Wu, Guangdong; Duan, Kaifeng; Zuo, Jian; Yang, Jianlin; Wen, Shiping

    2016-10-28

    The construction industry is a demanding work environment where employees' work-family conflict is particularly prominent. This conflict has a significant impact on job and family satisfaction and performance of employees. In order to analyze the dynamic evolution of construction industry employee's work-family conflict between work and family domains, this paper constructs a bi-directional dynamic model framework of work-family conflict by referring to the relevant literature. Consequently, a system dynamics model of employee's work-family conflict in the construction industry is established, and a simulation is conducted. The simulation results indicate that construction industry employees experience work interference with family conflict (WIFC) levels which are significantly greater than the family interference with work conflict (FIWC) levels. This study also revealed that improving work flexibility and organizational support can have a positive impact on the satisfaction and performance of construction industry employees from a work and family perspective. Furthermore, improving family support can only significantly improve employee job satisfaction.

  9. System Dynamics Model and Simulation of Employee Work-Family Conflict in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2016-10-01

    Full Text Available The construction industry is a demanding work environment where employees’ work-family conflict is particularly prominent. This conflict has a significant impact on job and family satisfaction and performance of employees. In order to analyze the dynamic evolution of construction industry employee’s work-family conflict between work and family domains, this paper constructs a bi-directional dynamic model framework of work-family conflict by referring to the relevant literature. Consequently, a system dynamics model of employee’s work-family conflict in the construction industry is established, and a simulation is conducted. The simulation results indicate that construction industry employees experience work interference with family conflict (WIFC levels which are significantly greater than the family interference with work conflict (FIWC levels. This study also revealed that improving work flexibility and organizational support can have a positive impact on the satisfaction and performance of construction industry employees from a work and family perspective. Furthermore, improving family support can only significantly improve employee job satisfaction.

  10. [Muskuloskeletal disorders in construction industry: hospital cases].

    Science.gov (United States)

    Santini, M; Riva, M M; Mosconi, G

    2012-01-01

    The authors analyse 493 hospital cases in 356 workers from the construction industry, came to observation for musculoskeletal disorders (average age 48, 2 years, SD 9; work seniority 32, 2 years, SD 9, 7; work seniority in construction industry 27, 3 years, SD 12, 4). The evaluation was required in 305 subjects (85.7% of the sample) to investigate one or more suspected WMDS; in 51 subjects (14.3% of the sample) to express an opinion on fitness to work or residual work capacity. Investigations led to diagnosis of 479 musculoskeletal disorders; the districts most affected are spine and upper limb. 64.7% of the musculoskeletal disorders was evaluated to be work-related, the percentage rises to 68% when considering only cases sent for evaluation of suspected WMDS. The most frequent reasons to exclude relation between the musculoskeletal disorders and work were an high age at diagnosis, presence of comorbidity or outcome of trauma, a disease mismatch exposure.

  11. Environmental and economic evaluation of natural capital appropriation through building construction: practical case study in the Italian context.

    Science.gov (United States)

    Bastianoni, Simone; Galli, Alessandro; Pulselli, Riccardo Maria; Niccolucci, Valentina

    2007-11-01

    This paper focuses on appropriation of natural capital through construction of buildings. The ecological footprint and the Costanza natural capital concepts are applied. The environmental consequences of human settlement are currently of great concern, and a need is felt to reduce the impact of building on the environment. The embodied energy of building materials and the "land area" required to sustain their production are considered to evaluate the demand on nature of this activity. The ecological footprints of 2 typical Italian buildings are compared. The paper also focuses on how to reduce the natural capital appropriation of building construction by means of environmentally inexpensive materials, renewable energy resources, and optimization of the use of bioproductive land by construction of multistoried buildings. Finally, to allocate an environmental load of buildings, an economic evaluation of natural capital appropriation through building construction is proposed.

  12. Constructive systems, load-bearing and enclosing structures of high-rise buildings

    Science.gov (United States)

    Anatol'evna Korol', Elena; Olegovna Kustikova, Yuliya

    2018-03-01

    As the height of the building increases, loads on load-carrying structures increase dramatically, and as a result of the development of high-rise construction, several structural systems of such buildings have been developed: frame, frame-frame, cross-wall, barrel, box-type, box-to-wall ("pipe in pipe", "Trumpet in the farm"), etc. In turn, the barrel systems have their own versions: cantilever support of the ceilings on the trunk, suspension of the outer part of the overlap to the upper carrying console "hanging house" or its support by means of the walls on the lower bearing cantilever, intermediate position of the supporting cantilevers in height to the floor, from a part of floors. The object of the study are the structural solutions of high-rise buildings. The subject of the study is the layout of structural schemes of high-rise buildings, taking into account the main parameters - altitude (height), natural climatic conditions of construction, materials of structural elements and their physical and mechanical characteristics. The purpose of the study is to identify the features and systematization of structural systems of high-rise buildings and the corresponding structural elements. The results of the research make it possible, at the stage of making design decisions, to establish rational parameters for the correspondence between the structural systems of high-rise buildings and their individual elements.

  13. Construction products performances and basic requirements for fire safety of facades in energy rehabilitation of buildings

    Directory of Open Access Journals (Sweden)

    Laban Mirjana Đ.

    2015-01-01

    Full Text Available Construction product means any product or kit which is produced and placed on the market for incorporation in a permanent manner in construction works, or parts thereof, and the performance of which has an effect on the performance of the construction works with respect to the basic requirements for construction works. Safety in case of fire and Energy economy and heat retention represent two among seven basic requirements which building has to meet according to contemporary technical rules on planning and construction. Performances of external walls building materials (particularly reaction to fire could significantly affect to fire spread on the façade and other building parts. Therefore, façade shaping and materialization in building renewal process, has to meet the fire safety requirement, as well as the energy requirement. Brief survey of fire protection regulations development in Serbia is presented in the paper. Preventive measures for fire risk reduction in building façade energy renewal are proposed according to contemporary fire safety requirements.

  14. The Needs for Professionalism and Competency in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Adebiyi John Oladotun

    2016-09-01

    Full Text Available The quantity surveyors, in the present day construction industry, analyze cost components of a construction project in a scientific way and applies the results of the analysis to a variety of financial and economic problems confronting the developer and the designer. However, competence, in any sphere of work, can be a difficult concept to pin down, especially, when it relates to professional occupations where such roles are complex and involved diverse professionals in the built environment sector. This paper aims to investigate the competencies of quantity surveyors in the discharge of its professional duties by evaluating the effects of professional competency on quantity surveying practices in Nigeria. The study population comprised professional quantity surveyors who are in the private construction/consulting firms in Lagos State, Nigeria. Data were obtained to investigate the professional views on the quantity surveying profession, the roles of quantity surveyors in the construction industry and the need for professionalism and competencies in the surveying industry. Questionnaires were administered to randomly select 200 practicing quantity surveyors in Lagos state. Findings revealed that the major role of quantity surveyors in the construction industry is the preparation of the bill of quantity as it ranked 1st with RII value of 1.00; it was also discovered that quantity surveyors were in agreement with client service delivery as the first ethical standard that construction professionals should consider when performing their professional obligations in order to avoid project failure and over-cost. It is therefore recommended that the professional bodies and the academia should organize proper and adequate service trainings, workshops and seminars which will enhance the possibility of acquiring more skills and experience so as to improve competence in the discharge of quantity surveyors professional duties.

  15. The Need for Professionalism and Competencies in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Adebiyi John Oladotun

    2017-01-01

    Full Text Available The quantity surveyors, in the present day construction industry, analyze cost components of a construction project in a scientific way and applies the results of the analysis to a variety of financial and economic problems confronting the developer and the designer. However, competence, in any sphere of work, can be a difficult concept to pin down, especially, when it relates to professional occupations where such roles are complex and involved diverse professionals in the built environment sector. This paper aims to investigate the competencies of quantity surveyors in the discharge of its professional duties by evaluating the effects of professional competency on quantity surveying practices in Nigeria. The study population comprised professional quantity surveyors who are in the private construction/consulting firms in Lagos State, Nigeria. Data were obtained to investigate the professional views on the quantity surveying profession, the roles of quantity surveyors in the construction industry and the need for professionalism and competencies in the surveying industry. Questionnaires were administered to randomly select 200 practicing quantity surveyors in Lagos state. Findings revealed that the major role of quantity surveyors in the construction industry is the preparation of the bill of quantity as it ranked 1st with RII value of 1.00; it was also discovered that quantity surveyors were in agreement with client service delivery as the first ethical standard that construction professionals should consider when performing their professional obligations in order to avoid project failure and over-cost. It is therefore recommended that the professional bodies and the academia should organize proper and adequate service trainings, workshops and seminars which will enhance the possibility of acquiring more skills and experience so as to improve competence in the discharge of quantity surveyors professional duties.

  16. Prevention of radioactive gas seeping into buildings through constructive materials

    International Nuclear Information System (INIS)

    Khaydarov, R.A.; Gapurova, O.U.; Khaydarov, R.R.

    2004-01-01

    Full text: One of possible method of realization of the terrorist acts is using gases and liquids, which easily permeate through the constructive materials of walls, floor, ceiling, roof, etc. into buildings by the capillary action of the pores. Toxic volatile organic compounds, organic and inorganic gases, radioactive elements, especially, which emits alpha particles can be used as the dangerous substances. Increased ventilation may help in removing the gases, but can actually increase the gases level by increasing the suction through the pores of concrete. If the gases and liquids are soluble in water and are easily volatilized from it, they can also get by groundwater up to underground structures and penetrate inside through opening and pores in concrete or pushed by hydrostatic pressure. The purpose of this work is creating a method to reduce concentration of toxic and radioactive gases in homes, buildings, underground buildings, tunnels, hangars, garages, bomb shelters, etc. The most effective method to prevent penetration of radionuclides into premises of buildings and underground structures through walls, roofs, floors is using special chemicals, which seal micropores inside the construction materials against gases. Worked out chemicals which consist of blend of polymeric compounds are described in the paper. Radioactive gases permeability in constructive materials after treatment by chemicals was studied. Influence of types of cement, sand and gypsum, preliminary treatment by different chemicals, different types of polymeric compounds, time between treatments, moisture of materials, time between preparation of chemicals and treatment of materials (aging of chemicals), time between treatment of concrete and testing (aging of treated concrete) were examined. Experiments have shown that our method allows reducing the coefficient of gas permeability 200 - 400 times

  17. Sustainable construction building performance simulation and asset and maintenance management

    CERN Document Server

    2016-01-01

    This book presents a collection of recent research works that highlight best practice solutions, case studies and practical advice on the implementation of sustainable construction techniques. It includes a set of new developments in the field of building performance simulation, building sustainability assessment, sustainable management, asset and maintenance management and service-life prediction. Accordingly, the book will appeal to a broad readership of professionals, scientists, students, practitioners, lecturers and other interested parties.

  18. Building for a Changing Climate - Adaptation through planning and construction

    Energy Technology Data Exchange (ETDEWEB)

    2009-08-15

    Adaptation through planning and construction can help to reduce the negative effects of climate change, such as flooding, landslides, landslips, and erosion. The National Board of Housing, Building and Planning (Boverket) has conducted an analysis of how the Planning and Building Act can assist in the work towards climate change adaptation. This brochure provides guidance and support to for example property owners, developers, officials and decision makers in municipalities and the state

  19. 76 FR 13329 - Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building Services

    Science.gov (United States)

    2011-03-11

    ...] RIN 3090-AJ13 Reinstatement of Coverage Pertaining to Final Payment Under Construction and Building.... SUMMARY: GSA is proposing to amend the General Services Administration Acquisition Regulation (GSAR) to amend the GSAR to restore guidance on making final payments under construction and building service...

  20. Construction and applied research of low-carbon building evaluation index system

    Science.gov (United States)

    Liu, Zhongwen; Dong, Xiaohong; Gao, Pengzhao

    2017-04-01

    Energy conservation in building is a key link on alleviating energy-deficient contradiction, improving the quality of human life environment, and realizing sustainable development in our country. In this paper, we construct low-carbon building evaluation index system and evaluation method from five aspects—low-carbon structure, low-carbon materials, low-carbon energy, low-carbon technology and low-carbon management. Finally, taking “Solar Valley” in Dezhou as an example, we make the evaluation to its situation of low-carbon building.

  1. Overcoming Barriers to Innovation in the Building Industry

    NARCIS (Netherlands)

    Heintz, J.L.; Wamelink, J.W.F.

    2015-01-01

    We live in an era of accelerated innovation. All around us we are immersed in a sea of new technologies and products that were very recently confined to comic books and science fiction tv-series. Yet in this storm of innovation the building industry seems to stand out for it's committed old

  2. VHTR Construction Ripple Effect using Inter-Industry Analysis

    International Nuclear Information System (INIS)

    Lee, T. H.; Lee, K. Y.; Shin, Y. J.

    2015-01-01

    As a part of a VHTR economic analysis, we have studied the VHTR construction cost and operation and maintenance cost. However, it is somewhat difficult to expect the exact cost due to insufficient reference data and experience. As a result, we propose quantitative analysis techniques for ripple effects such as the production inducement effect, added value inducement effect, and employment inducement effect for VHTR 600MWt x 4 module construction and operation ripple effect based on NOAK. This paper presents a new method for the ripple effect and preliminary ripple effect consequence. We proposed a ripple effect analysis method using a time series and inter-industry table. As a result, we can predict that a 600MWth x 4 module VHTR reactor construction will bring about a 43771 employment effect, 24160 billion KRW production effect, and 4472 billion added value effect for 22 years. It is necessary to use the sub-account values of an inter-industry table to obtain a more precise effect result. However, the methodology can be applied with minor modification to another reactor type.

  3. VHTR Construction Ripple Effect using Inter-Industry Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Lee, T. H.; Lee, K. Y.; Shin, Y. J. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    As a part of a VHTR economic analysis, we have studied the VHTR construction cost and operation and maintenance cost. However, it is somewhat difficult to expect the exact cost due to insufficient reference data and experience. As a result, we propose quantitative analysis techniques for ripple effects such as the production inducement effect, added value inducement effect, and employment inducement effect for VHTR 600MWt x 4 module construction and operation ripple effect based on NOAK. This paper presents a new method for the ripple effect and preliminary ripple effect consequence. We proposed a ripple effect analysis method using a time series and inter-industry table. As a result, we can predict that a 600MWth x 4 module VHTR reactor construction will bring about a 43771 employment effect, 24160 billion KRW production effect, and 4472 billion added value effect for 22 years. It is necessary to use the sub-account values of an inter-industry table to obtain a more precise effect result. However, the methodology can be applied with minor modification to another reactor type.

  4. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  5. Building Canada: Phase One

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2004-04-15

    The 'Building Canada' program modelled after the 'Building America' program, aims at increasing energy efficiency and affordability, primarily for single family homes. The program takes a holistic and whole house view, employing a systems approach and is committed to continuous improvement through testing, evaluation, retesting and novel construction practices. The program's objective is to re-engineer house designs so that builders can take advantage of advanced products and achieve maximum efficiency. Building Canada aims to achieve its objectives through partnership with the housing industry, focusing on increasing energy efficiency while reducing construction time, using and wasting fewer materials, forestalling call backs, and reducing overall costs. The Building Canada procedures encompass marketing, research of builder's operations, re-engineering mechanical systems, framing components and techniques, moisture control and thermal performance, construction, resolution of problems in re-engineered homes, and discussion of results in demonstration homes. The program as a whole is built on the feasibility study of a Building Canada program carried out in Nova Scotia and Ontario. Some of the results of this pilot study summarized in this report indicate that the Building Canada is not suitable for use by small builders. Benefits are most likely to be realized by only by builders constructing more than 100 homes annually.

  6. A multi-agent safety response model in the construction industry.

    Science.gov (United States)

    Meliá, José L

    2015-01-01

    The construction industry is one of the sectors with the highest accident rates and the most serious accidents. A multi-agent safety response approach allows a useful diagnostic tool in order to understand factors affecting risk and accidents. The special features of the construction sector can influence the relationships among safety responses along the model of safety influences. The purpose of this paper is to test a model explaining risk and work-related accidents in the construction industry as a result of the safety responses of the organization, the supervisors, the co-workers and the worker. 374 construction employees belonging to 64 small Spanish construction companies working for two main companies participated in the study. Safety responses were measured using a 45-item Likert-type questionnaire. The structure of the measure was analyzed using factor analysis and the model of effects was tested using a structural equation model. Factor analysis clearly identifies the multi-agent safety dimensions hypothesized. The proposed safety response model of work-related accidents, involving construction specific results, showed a good fit. The multi-agent safety response approach to safety climate is a useful framework for the assessment of organizational and behavioral risks in construction.

  7. Radon prevention in the design and construction of schools and other large buildings

    International Nuclear Information System (INIS)

    Leovic, K.W.; Craig, A.B.; Harris, D.B.

    1991-01-01

    The paper discusses radon prevention in the design and construction of schools and other large buildings. The U.S. EPA's Office of Research and Development (ORD) has started incorporating radon control measures into the design and construction of new schools and other large buildings. The goal of the new designs is twofold: (1) to prevent elevated radon levels in the completed building, and (2) to provide the protection at a fraction of the cost of retrofit systems. ORD's Air and Energy Engineering Research Laboratory (AEERL) has conducted the research necessary to develop viable designs. The Indoor Radon Abatement Act of 1988 set a national long-term goal for indoor radon of 0.5 picocurie per liter (pCi/L)--the same as that typically found in outdoor air. The EPA currently recommends that homeowners take action to reduce radon levels to below 4 pCi/L. To achieve the national goal set in the 1988 Act for new construction in radon-prone areas, AEERL research is using a combination of active subslab depressurization (ASD) and operation of the heating, ventilation, and air-conditioning (HVAC) system to pressurize buildings. These measures are described briefly, along with a case history of one building

  8. Definition of Availability Index of Deformed Building Constructions Using the Finite - Element Analysis Package

    Science.gov (United States)

    Shutova, M. N.; Skibin, G. M.; Evtushenko, S. I.

    2017-11-01

    The paper is devoted to the problem of definition of availability index of deforming building construction in atypical cases. The authors revealed a real applicability of the finite-elements analyses package, such as ANSYS, for engineering testing calculations of building constructions and determination of the sites of increased stresses. It was determined that stresses increased up to 7.75 times in the sites with mechanical defects (for steel crane girder); also, the authors revealed the convergence of the calculation results between the finite element method and a usual decision using the strength of materials (in the limits 2-14% for steel truss frame). The equivalent stresses don’t exceed the maximum permissible tension for this type of steel. The building constructions have a limited availability index.

  9. Converted Industrial Buildings : Where Past and Present Live in Formal Unity

    NARCIS (Netherlands)

    Rogic, T.

    2009-01-01

    This thesis deals with design guidelines, as defined in the field of architectural conservation, by focusing on the problem of the conversion of industrial buildings. It is generally agreed that the best way to secure the future life of industrial heritage is through their adaptive reuse. The former

  10. The effect of micro air movement on the heat and moisture characteristics of building constructions

    NARCIS (Netherlands)

    Schijndel, van A.W.M.

    2010-01-01

    The research focuses on the effect of air movement through building constructions. Although the typical air movement inside building constructions is quite small (velocity is of order ~10-5 m/s), this research shows the impact on the heat and moisture characteristics. The paper presents a case study

  11. The effect of micro air movement on the heat and moisture characteristics of building constructions

    NARCIS (Netherlands)

    Schijndel, van A.W.M.

    2008-01-01

    The research focuses on the effect of air movement through building constructions. Although the typical air movement inside building constructions is quite small (velocity is of order ~10-5 m/s), this research shows the impact on the heat and moisture characteristics. The paper presents a case study

  12. Rationalization of design and construction of buildings for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-02-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.).

  13. Rationalization of design and construction of buildings for nuclear power plants

    International Nuclear Information System (INIS)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-01-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.)

  14. The effects of the global financial crisis on the Australian building construction supply chain

    Directory of Open Access Journals (Sweden)

    Ram Karthikeyan Thangaraj

    2012-09-01

    Full Text Available This study involves a financial analysis of 43 publicly listed and large private companies in the building and construction supply chain from 2005 to 2010; straddling the period of the global financial crisis (GFC; and examines the impact of the GFC on the performance of these companies. The construction supply chain was divided into four sectors – material suppliers, construction companies, property developers and real estate investment trusts (REITs. The findings indicate that the impact was minimal for both material suppliers and construction companies, but especially severe for the more leveraged property developers and REITs. Building material suppliers and construction companies have benefitted substantially from the building economic stimulus package provided by the Australian government to mitigate the effects of the GFC. Decreases in the valuation of assets have, to a large extent, reduced the profitability of property developers and REITs during the GFC but these companies have recovered quickly from these adverse conditions to return to a sound financial position by the end of the 2010 financial year. The results will inform investors, managers and construction professionals in devising strategies for prudent financial management and for weathering future financial crises.

  15. Application of BIM technology in green scientific research office building

    Science.gov (United States)

    Ni, Xin; Sun, Jianhua; Wang, Bo

    2017-05-01

    BIM technology as a kind of information technology, has been along with the advancement of building industrialization application in domestic building industry gradually. Based on reasonable construction BIM model, using BIM technology platform, through collaborative design tools can effectively improve the design efficiency and design quality. Vanda northwest engineering design and research institute co., LTD., the scientific research office building project in combination with the practical situation of engineering using BIM technology, formed in the BIM model combined with related information according to the energy energy model (BEM) and the application of BIM technology in construction management stage made exploration, and the direct experience and the achievements gained by the architectural design part made a summary.

  16. A review on the occupational health and social security of unorganized workers in the construction industry.

    Science.gov (United States)

    Tiwary, Guddi; Gangopadhyay, P K

    2011-01-01

    Construction is one of the important industries employing a large number of people on its workforce. A wide range of activities are involved in it. Due to the advent of industrialization and recent developments, this industry is taking a pivotal role for construction of buildings, roads, bridges, and so forth. The workers engaged in this industry are victims of different occupational disorders and psychosocial stresses. In India, they belong to the organized and unorganized sectors. However, data in respect to occupational health and psychosocial stress are scanty in our country. It is true that a sizable number of the workforce is from the unorganized sectors - the working hours are more than the stipulated hours of work - the work place is not proper - the working conditions are non-congenial in most of the cases and involve risk factors. Their wages are also not adequate, making it difficult for them to run their families. The hazards include handling of different materials required for construction, and exposure to harsh environmental conditions like sun, rain, and so on. On account of this, in adverse conditions, it results in accidents and adverse health conditions cause psychosocial strain and the like. They are victims of headache, backache, joint pains, skin diseases, lung disorders like silicosis, other muscular skeletal disorders, and so on. The repetitive nature of the work causes boredom and the disproportionate earning compared to the requirements puts them under psychological stress and strain and other abnormal behavioral disorders. The Government of India has realized the importance of this industry and has promulgated an Act in 1996. The state government are being asked to adhere to this, although only a few states have partially enforced it. In this article, attempts have been made to review some of the important available articles for giving a broad idea of the problem and for furtherance of research in this field.

  17. Identifying the Critical Factors Affecting Safety Program Performance for Construction Projects within Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Zubair Ahmed Memon

    2013-04-01

    Full Text Available Many studies have shown that the construction industry one of the most hazardous industries with its high rates of fatalities and injuries and high financial losses incurred through work related accident. To reduce or overcome the safety issues on construction sites, different safety programs are introduced by construction firms. A questionnaire survey study was conducted to highlight the influence of the Construction Safety Factors on safety program implementation. The input from the questionnaire survey was analyzed by using AIM (Average Index Method and rank correlation test was conducted between different groups of respondents to measure the association between different groups of respondent. The finding of this study highlighted that management support is the critical factor for implementing the safety program on projects. From statistical test, it is concluded that all respondent groups were strongly in the favor of management support factor as CSF (Critical Success Factor. The findings of this study were validated on selected case studies. Results of the case studies will help to know the effect of the factors on implementing safety programs during the execution stage.

  18. Training program for energy conservation in new-building construction. Volume II. Energy conservation technology: for the building inspector

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-12-01

    A Model Code for Energy Conservation in New Building Construction has been developed by those national organizations primarily concerned with the development and promulgation of model codes. The technical provisions are based on ASHRAE Standard 90-75 and are intended for use by state and local officials. This training manual contains the basic information necessary to acquaint the field building inspector with the concepts of energy conservation in buildings and instructs him in the basic techniques of field inspection of energy compliance.

  19. 13 CFR 120.131 - Leasing part of new construction or existing building to another business.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Leasing part of new construction or existing building to another business. 120.131 Section 120.131 Business Credit and Assistance... § 120.131 Leasing part of new construction or existing building to another business. (a) If the SBA...

  20. THE CONCEPT OF ENTERPRISE COMPETITIVENESS AND THE MAIN FACTORS FOR ITS PROVISION IN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Potapova Irina Ivanovna

    2018-01-01

    micro-level factors. In turn, the internal factors were grouped as follows: production factors, financial and economic factors, intellectual factors. A detailed study of these factors led to the conclusion that they can have both a negative and a positive impact. Conclusions: the conducted research has allowed us to define the basic directions which promote increase of competitiveness of building enterprises. Among all such directions, the following ones should be highlighted: creation of an optimum volume of industrial and financial funds; availability of qualified personnel in the organization; application of modern technologies and innovative processes, effective marketing tools; execution of construction works taking into account the norms and rules established by the Russian legislation.

  1. The construction of a PWR power station reactor building liner

    International Nuclear Information System (INIS)

    Skirving, N.; Goulding, J.S.; Gibson, J.A.

    1991-01-01

    Cleveland Bridge and Engineering Co Ltd (CBE) are constructing the Reactor Building Liner Plate containment of the Sizewell 'B' Power Station for Nuclear Electric Ltd. This has entailed extensive offsite prefabrication of components and their subsequent erection at Sizewell. It has been necessary to engineer temporary supporting mechanisms to enable manufacture and erection to proceed, yet also to withstand wet concrete forces during the progressive construction. The Reactor Building Liner Plate is a safety related system and as such, in addition to strict compliance with the ASME code, the Quality Assurance (QA) requirements of BS 5882 are applicable. A dedicated Project Team was established by CBE to control and direct the work. Equally important as satisfying the rigorous Q.A. requirements has been the need to meet programme and budget. This paper details CBE execution of the Project. (author)

  2. Economics of high-rise construction: the feasibility of skyscrapers building in the Russian cities

    Science.gov (United States)

    Petrov, Artur; Petrova, Daria

    2018-03-01

    The article considers the economic aspects of constructing high-rise buildings in the world and in Russia. Data on the number of high-rise buildings in Russian cities with a million population are presented. It is proved that interest in high-rise construction in Russia has been formed only in Moscow and partly in St. Petersburg and Yekaterinburg. The analysis showed that the reason for this is the expensiveness of high-rise construction. According to the enlarged macro-calculation, the cost of building 1 m2 of the area of the Federation Towers complex (Moscow City) is about 2710 /m2. Practically a possibility of return on investments in the foreseeable time interval exists only in Moscow. For the regions of Russia this task is rather complicated. Population density in regional Russian cities is quite low, business entities do not have the necessary financial resources for investing in high-rise construction, and investments from abroad absent.

  3. Building Industry Enterprises Logistic System according to their Life-cycle and Organizational Adaptation

    Directory of Open Access Journals (Sweden)

    Natalya Voznenko

    2016-01-01

    Full Text Available This article presents a survey of the Ukrainian machinery-building industry enterprises performance in 2012-2014 due to the state of their logistic systems development and companies’ life-cycle stage. The review of existing theoretical approaches shows the range of possible criteria for evaluation at each level of the industry, enterprise and product. The conducted research evaluates the Ukrainian machinery-building industry and the companies that create that potential. The peculiarities of the organizational adaptation of the above mentioned enterprises and the developed recommendations will help to establish an adaptive management and gain enterprises’ market competitiveness.

  4. Radiation processing of polyethylene and polymethylmethacrylate for construction industry and architecture

    International Nuclear Information System (INIS)

    Knizhnik, E.I.; Gordienko, V.P.; Il'yenko, R.E.; Onisko, A.D.; AN Ukrainskoj SSR, Kiev. Inst. Fizicheskoj Khimii)

    1983-01-01

    Radiation processing of relief-forming molds made of filled high-density polyethylene enables them to be used for shaping concrete and ferroconcrete barrier constructions of buildings; radiation processing of polymethylmethacrylate in unit form makes it possible to produce large-size decorative elements of building interior. The subject is discussed and examples presented. (author)

  5. Barriers to the Uptake of Concurrent Engineering in the Nigerian Construction Industry

    OpenAIRE

    Aniekwu, Nathaniel Anny; Igboanugo, Anthony C.

    2012-01-01

    It is the consensus of scholars that the productivity of the construction industry is very low when compared with other industries. Concurrent Engineering (CE), which has a primary goal of reducing the total time from designing a product to releasing it into the market, while creating better designs as well, has been identified as one of the concepts that has yielded effective adaptation in the construction industry. An exploratory survey was used to identify 63 variables with the capacity to...

  6. Reprocessing of metallurgical slag into materials for the building industry

    International Nuclear Information System (INIS)

    Pioro, L.S.; Pioro, I.L.

    2004-01-01

    Several methods of reprocessing metallurgical (blast furnace) slag into materials for the building industry, based on melting aggregates with submerged combustion, were developed and tested. The first method involves melting hot slag with some additives directly in a slag ladle with a submerged gas-air burner, with the objective of producing stabilized slag or glass-ceramic. The second method involves direct draining of melted slag from a ladle into the slag receiver, with subsequent control of the slag draining into the converter where special charging materials are added to the melt, with the objective of producing glass-ceramic. A third method involves melting cold slag with some additives inside a melting converter with submerged gas-air burners, with the objective of producing glass-ceramic fillers for use in road construction. Specific to the melting process is the use of a gas-air mixture with direct combustion inside the melt. This feature provides melt bubbling to help achieve maximum heat transfer from combustion products to the melt, improve mixing (and therefore homogeneity of the melt), and increases the rate of chemical reactions. The experimental data for different aspects of the proposed methods are presented. The reprocessed blast-furnace slag in the form of granules can be used as fillers for concretes, asphalts, and as additives in the production of cement, bricks and other building materials. As well, reprocessed blast-furnace slag can be poured into forms for the production of glass-ceramic tiles

  7. Reuse of industrial sludge as construction aggregates.

    Science.gov (United States)

    Tay, J H; Show, K Y; Hong, S Y

    2001-01-01

    Industrial wastewater sludge and dredged marine clay are high volume wastes that needed enormous space at landfill disposal sites. Due to the limitation of land space, there is an urgent need for alternative disposal methods for these two wastes. This study investigates the possibility of using the industrial sludge in combination with marine clay as construction aggregates. Different proportions of sludge and clay were made into round and angular aggregates. It was found that certain mix proportions could provide aggregates of adequate strength, comparable to that of conventional aggregates. Concrete samples cast from the sludge-clay aggregates yield compressive strengths in the range of 31.0 to 39.0 N/mm2. The results showed that the round aggregates of 100% sludge and the crush aggregates of sludge with up to 20% clay produced concrete of compressive strengths which are superior to that of 38.0 N/mm2 for conventional aggregate. The study indicates that the conversion of high volume wastes into construction materials is a potential option for waste management.

  8. Managing Conflict in The Nigerian Construction Industry: A Study of ...

    African Journals Online (AJOL)

    The study investigated the causes of conflictin the Nigerian construction industry and, the strategies for managing them in terms of resolutions and prevention. A quantitative approach using questionnaire survey was adopted to empirically test the opinions of construction professionals on causes of conflicts and ...

  9. Evaluation of Passive Vents in New Construction Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Maxwell, Sean [Steven Winter Associates, Norwalk, CT (United States); Berger, David [Steven Winter Associates, Norwalk, CT (United States); Zuluaga, Marc [Steven Winter Associates, Norwalk, CT (United States)

    2016-02-01

    Exhaust ventilation and corresponding outdoor air strategies are being implemented in high performance, new construction, multifamily buildings to meet program or code requirements for improved indoor air quality, but a lack of clear design guidance is resulting in poor performance of these systems despite the best intentions of the programs or standards.

  10. Contribution Index Based on Green Building Certification Systems

    Directory of Open Access Journals (Sweden)

    Yuting Sun

    2015-05-01

    Full Text Available Green Building Certification Systems (GBCS are carried out in many countries due to the rising awareness of the importance of sustainability in the building industry. The intention should have motivated participants to construct and operate buildings sustainably, however, there is not yet a method developed to investigate the motivation of the participants. Based on the GBCS, this paper proposes the contribution index as a standard global method to analyze the performance of participants in the green building industry. Three contribution indices, namely Frequency Contribution Index (FCI, Intensity Contribution Index (ICI and Comprehensive Contribution Index (CCI that concern each different category of participant, have been formulated. Three further analyses based on the index were undertaken to investigate some features of the industry. A case study of Singapore was conducted to show how the contribution index could be used to extract industry patterns and trends and assess the participants’ performance in the green building industry. Interviews with experts provide some suggested applications and support for the findings.

  11. Construction insolvency in Australia: reining in the beast

    Directory of Open Access Journals (Sweden)

    Jeremy Coggins

    2016-09-01

    Full Text Available Insolvency has become endemic in the Australian construction industry. The scale of the problem has reached such proportions that both the NSW Parliament and the Senate have, in recent times, commissioned inquiries into construction insolvency. This paper aims to identify the reasons as to why the construction industry is so susceptible to insolvency, evaluate the effectiveness of any existing insolvency protection measures available to construction firms, and to identify proposed future measures to address the factors causing construction insolvency. The results of a questionnaire survey designed to discover the extent of the construction insolvency problem, as well as building contractors’ views with respect to the causes and regulation of construction insolvency, in South Australia are presented. The research found that there is an appetite amongst building contractors for the introduction of further regulation to address construction insolvency. Further, although the research found underbidding to be the biggest contributory factor towards construction insolvency, it appears to be the most difficult factor to address through regulation which explains the paucity of recommendations which directly address underbidding emanating from the Senate inquiry in 2015.

  12. Selective classification and quantification model of C&D waste from material resources consumed in residential building construction.

    Science.gov (United States)

    Mercader-Moyano, Pilar; Ramírez-de-Arellano-Agudo, Antonio

    2013-05-01

    The unfortunate economic situation involving Spain and the European Union is, among other factors, the result of intensive construction activity over recent years. The excessive consumption of natural resources, together with the impact caused by the uncontrolled dumping of untreated C&D waste in illegal landfills have caused environmental pollution and a deterioration of the landscape. The objective of this research was to generate a selective classification and quantification model of C&D waste based on the material resources consumed in the construction of residential buildings, either new or renovated, namely the Conventional Constructive Model (CCM). A practical example carried out on ten residential buildings in Seville, Spain, enabled the identification and quantification of the C&D waste generated in their construction and the origin of the waste, in terms of the building material from which it originated and its impact for every m(2) constructed. This model enables other researchers to establish comparisons between the various improvements proposed for the minimization of the environmental impact produced by building a CCM, new corrective measures to be proposed in future policies that regulate the production and management of C&D waste generated in construction from the design stage to the completion of the construction process, and the establishment of sustainable management for C&D waste and for the selection of materials for the construction on projected or renovated buildings.

  13. Modelling the life-cycle of sustainable, living buildings

    NARCIS (Netherlands)

    Van Nederveen, S.; Gielingh, W.

    2009-01-01

    Credit-reductions by banks, as a consequence of the global monetary crisis, will hit the construction industry for many years to come. There are however still financing opportunities for building projects that are perceived as less risky. Buildings that are not only sustainable, but also flexible

  14. The use of constructed wetlands for the treatment of industrial wastewater

    Directory of Open Access Journals (Sweden)

    Skrzypiecbcef Katarzyna

    2017-09-01

    Full Text Available Constructed wetlands are characterized by specific conditions enabling simultaneous various physical and biochemical processes. This is the result of specific environment for the growth of microorganisms and hydrophytes (aquatic and semiaquatic plants which are capable of living in aerobic, anaerobic and facultative anaerobic conditions. Their interaction contributes to the intensification of oxidation and reduction responsible for the removal and retention of pollutants. These processes are supported by sorption, sedimentation and assimilation. Thanks to these advantages, treatment wetland systems have been used in communal management for over 50 years. In recent years, thanks to its advantages, low operational costs and high removal efficiency, there is growing interest in the use of constructed wetlands for the treatment or pre-treatment of various types of industrial wastewater. The study analyzes current use of these facilities for the treatment of industrial wastewater in the world. The conditions of use and efficiency of pollutants removal from readily and slowly biodegradable wastewater, with special emphasis on specific and characteristic pollutants of particular industries were presented. The use of subsurface horizontal flow beds for the treatment of industrial wastewater, among others from crude oil processing, paper production, food industry including wineries and distillery, olive oil production and coffee processing was described. In Poland constructed wetlands are used for the treatment of sewage and sludge from milk processing in pilot scale or for dewatering of sewage sludge produced in municipal wastewater treatment plant treating domestic sewage with approximately 40% share of wastewater from dairy and fish industry. In all cases, constructed wetlands provided an appropriate level of treatment and in addition the so-called ecosystem service.

  15. Space heating in buildings: thermal diagnosis of an industrial building; Chauffage des batiments: bilan thermique d`un batiment industriel

    Energy Technology Data Exchange (ETDEWEB)

    Brunet, R.

    1996-12-31

    The various heat transfer equations used for calculations in thermal diagnosis of an industrial building are reviewed: calculation of the heat losses through walls as a function of building materials, calculation of the energy consumption for heating fresh air (as a function of the air pollution rate in the building), calculation of the total heat losses, the heating energy demand and the annual energy consumption. Data concerning building materials characteristics, insulation and heating loads in the various regions of France, are also presented

  16. PROBLEMS AND PROSPECTS OF CONSTRUCTION INDUSTRY DEVELOPMENT IN RUSSIA IN THE CONDITIONS OF ECONOMIC CRISIS

    Directory of Open Access Journals (Sweden)

    Nidziy Elena Nikolaevna

    2016-05-01

    Full Text Available The construction industry is one of the key fund-creating industries, the formation of the Russian economy greatly depends on it. The construction sector is cyclic, that’s why it has always been sensitive to the tendencies of the national economy. In the contemporary conditions of weak economical climate the construction industry is in a state of sluggish recession. The key indicators exercising restraining influence on the construction complex are analyzed. The author carried out calculations of the prices for residential real estate in the past years. The author’s view on the near-term prospects on the exit from recession state is formulated. From the view of the today’s state and the nearest development prospects, it can be stated that the construction industry is one of the most problematic among the basic economic sectors. Retrieval of the expansion rate of the construction industry is possible in case of the positive changes of general economic state.

  17. Plating Plant Waste Utilization in Glasswork, Ceramic and Building Industry

    International Nuclear Information System (INIS)

    Nikolaev, V.P.; Scheglov, M.; Korneva, S.A.

    1999-01-01

    The technology allows using electroplating plant waste for recovery of fine inorganic pigments, which may be used in paintwork and ceramic industry (for coating and enamel preparation, for ceramic painting), in glasswork (colored glass) and in building industry (for producing foundation slabs, sidewalk plates and curbing, for art urban planning, for pavement and aerodrome covering and so on). For fine inorganic pigment recovery so-called sol-gel method was used

  18. Client-oriented Building Mass Customization (CoBMC)

    Science.gov (United States)

    Lee, Xia Sheng; Faris Khamidi, Mohd; Kuppusamy, Sivaraman; Tuck Heng, Chin

    2017-12-01

    Although much later compared to other industries including aerospace, automobile, oil and gas etc., digital technology development has been cresting towards an exponential curve in the construction industry. Technological diversity and abundance change the game from “what you can” to “what you want”. Society is changing at an unprecedented rate. Consequently adaptability will be crucial. This research paper explores the integration of digital adaptive technologies that transform the construction industry from the mass production to that of a possible client-oriented mass customization. The focus on the design, construction and performance stages of a building project, currently undergoing major overhaul faces a paradigm shift globally that will impact and compel attention for the next three decades with viable solutions such as Building Information Modelling (BIM) to manage massive data cum information. Customization maximizes clients’ participation during the design process thereby achieving greater effective value and higher satisfaction. A study between customized and standardized examples will investigate how adaptive customization will shift the design paradigm from cost to value centric. This action research will explore different aspects of emerging innovative systems already in place pushing the edge of frontiers, and transforming the building industry landscape whether micro or giga, to compliment new technologies to create an unprecedented exhilaration of freshness over the mundane, routine and mediocrity. Three identified fundamental aspects that are instrumental to Client-oriented Building Mass Customization (CoBMC) are design option visualization, parametric product information and n-dimensional modelling. The study concluded that a paradigm shift is therefore inevitable for every stakeholder including clients who will need to re-examine their roles, capabilities, and competencies in preparation towards challenging future.

  19. Comparative Study On The Ethical Perceptions Of Contractors And Designers In The China Construction Industry

    Science.gov (United States)

    Kang, Byung Gyoo; Long, Kaiwen; Zhang, Cheng; Li Hao, Jian

    2017-12-01

    Ethics is becoming one of the most important requirements for successful business in the 21st century. The construction industry cannot be exceptional from this trend. However construction ethics management requires different approaches from other industries, as the products of the industry are construction projects which are completely different from mass production. Contractors and designers are two major participants in construction projects. The roles and responsibilities of these two project stakeholders decisively influence all aspects of construction project. Practically ethical perceptions of contractors and designers are one of main aspects to be considered for the effective and efficient management of ethics for the construction industry. This research has investigated the ethical perceptions of contractors and designers in the China construction industry. A questionnaire survey which contains 15 ethical issues and 6 demographic factors has been conducted. 170 construction professionals from construction companies and consulting companies have been participated in this survey. These 15 ethical issues are ranked in terms of seriousness, frequency and importance for both contractors and designers as a single group to understand the overall perceptions in the industry. The analysis has also been conducted for contractors and designers respectively to make comparisons between them. The top three serious ethical issues in the industry are ‘Bribery and corruption’, ‘Failure to practice whistle-blowing’ and ‘Improper bidding practices’. Contractors and designers showed similar outcomes for the top five important ethical issues. But for the middle ranged ethical issues, they showed some differences. Further researches are required to identify the causes of the similarity and differences.

  20. The Role of the International Code Council in the U.S. Building Regukation System and Green Building Contruction

    OpenAIRE

    David Walls

    2015-01-01

    This paper will address the components of the International Code Council (ICC) as one of the most important organizations in terms of developing the model building codes for the US: the international codes. This membership-driven organization has the task of providing the building industry and all its stakeholders with the necessary regulatory documents, training, certification, plan check, product evaluation, and accreditation services to achieve safer and more sustainable building construct...

  1. Decision support model for selecting and evaluating suppliers in the construction industry

    Directory of Open Access Journals (Sweden)

    Fernando Schramm

    2012-12-01

    Full Text Available A structured evaluation of the construction industry's suppliers, considering aspects which make their quality and credibility evident, can be a strategic tool to manage this specific supply chain. This study proposes a multi-criteria decision model for suppliers' selection from the construction industry, as well as an efficient evaluation procedure for the selected suppliers. The model is based on SMARTER (Simple Multi-Attribute Rating Technique Exploiting Ranking method and its main contribution is a new approach to structure the process of suppliers' selection, establishing explicit strategic policies on which the company management system relied to make the suppliers selection. This model was applied to a Civil Construction Company in Brazil and the main results demonstrate the efficiency of the proposed model. This study allowed the development of an approach to Construction Industry which was able to provide a better relationship among its managers, suppliers and partners.

  2. Impact of Fragmentation Issue in Construction Industry: An Overview

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available In general, fragmentation within the construction industry arises from two areas within the traditional construction process; the construction work process where the most significant division is in the separation of the design and construction phase, and the construction structure itself. The fragmentation process in traditional contracting practice further hinders the integration of construction knowledge among contractors, diminishing the opportunity for them to influence design decisions. When design professionals fail to consider as to how a contractor would construct the designed project results in scheduling problems, delays, and disputes during the construction process. Moving towards team integration is considered a significant strategy for overcoming the issue. Accordingly, this paper discusses the fragmentation issue in more detail including its definition, and causes and effects to the construction projects. It also explores that the team integration strategy alleviates scheduling problems, and helps avoid delays and disputes during the construction process, preventing harm to overall project performance.

  3. Causes of Fatal Accidents Involving Cranes in the Australian Construction Industry

    OpenAIRE

    Gharaie, Ehsan; Lingard, Helen; Cooke, Tracy

    2015-01-01

    In ten years from 2004 to 2013, 359 workers died in the Australian construction industry because of work related causes. This paper investigates crane-related fatalities in order to find the upstream causation of such accidents. The National Coroners’ Information System (NCIS) database was searched to identify fatal accidents in the construction industry involving the use of a crane.  The narrative description of the cases provided in the coroners’ findings and associated documents were conte...

  4. Supply chain integration in the building industry : The emergence of integrated and repetitive strategies in a fragmented and project-driven industry

    NARCIS (Netherlands)

    Vrijhoef, R.

    2011-01-01

    The building industry is a fragmented and project-driven industry with specific characteristics, which can sometimes result in negative effects. Reference has often been made to other industries, particularly manufacturing, that would function more effectively and efficiently. Major differences

  5. Nondestructive testing methods in building industry '83. Part 1

    International Nuclear Information System (INIS)

    1983-10-01

    The conference heard 52 papers of which 11 were incorporated in INIS. The subject of these was the use of radiometric methods and instruments for nondestructive testing of building materials and ways of testing the quality of concrete during nuclear power plant construction. (J.P.)

  6. Assessment of Carbon Emission Reduction for Buildings Projects in Malaysia-A Comparative Analysis

    Directory of Open Access Journals (Sweden)

    Klufallah Mustafa M. A.

    2014-01-01

    Full Text Available The Malaysian construction industry significantly contributes as an empowerment to its development vision of 2020 by reducing 40% of carbon emission. Moreover, this industry accounts as a threat to the environment, not only in terms of consumption of natural resources but also in emitting million tons of carbon emission annually. In fact, Malaysia is categorized the 30th in the world's ranking in carbon emission level. To mitigate the raise of carbon emission level from the buildings construction, several studies identified some of the effective carbon emission assessment tools for construction projects but it is lack of implementation in Malaysia. The green building index (GBI, Malaysian CIB Report has been introduced to assist the construction stakeholders in reducing the level of carbon emission and the impact of buildings on the environment. This paper presents an analysis of carbon emission from housing projects and office buildings in order to identify and quantify the main sources of carbon emission for each project and it proposes environmental friendly materials as replacement for conventional construction materials to achieve the implementation of sustainability in Malaysia.

  7. Stepwise modularization in the construction industry using a bottom-up approach

    DEFF Research Database (Denmark)

    Kudsk, Anders; Grønvold, Martin O'Brien; Olsen, Magnus Holo

    2013-01-01

    The manufacturing industry has experienced a great deal of improvement in efficiency and cost reductions throughout the last centuries. But although there have been improvements in the manufacturing industry, the principles and work methods in the construction industry have stood still for more t...... than a hundred years. Based on principles of mass customization applied in the manufacturing industry, two cases of successful implementation of mass customization and modularization have been investigated as a means of showcasing the possibility to incorporate standardization in parts...... implemented stepwise. The case shows that substantial benefits can be gained through implementing modularized construction. It is especially interesting to note that these benefits are achieved through the development of a module with focus on the internal interfaces. © Kudsk et al.; Licensee Bentham Open....

  8. 32 CFR 644.486 - Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or...

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar contracts. 644.486 Section 644.486 National... Disposal of buildings and improvements constructed under emergency plant facilities (EPF) or similar...

  9. Sustainable materials for low carbon buildings

    OpenAIRE

    B.V. Venkatarama Reddy

    2009-01-01

    This paper focuses on certain issues pertaining to energy, carbon emissions and sustainability of building construction with particular reference to the Indian construction industry. Use of sustainable natural materials in the past, related durability issues, and the implications of currently used energy-intensive materials on carbon emissions and sustainability are discussed. Some statistics on the Indian construction sector regarding materials produced in bulk quantities and the energy impl...

  10. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  11. Constructive fire protection of steel corrugated beams of buildings and other structures

    Directory of Open Access Journals (Sweden)

    Ilyin Nikolay

    2017-01-01

    Full Text Available The research introduces a methodology of establishing indicators of fire safety of a building in relation to a guaranteed duration of steel fire-proof corrugated beams resistance in conditions of standard fire tests. Indicators of fire safety are also established in the assessment of design limits of steel fire-proof corrugated beams during design process, construction or maintenance of the building as well as in reducing economic costs when testing steel structures for fire resisting property. The suggested methodology introduces the system of actions aimed to design constructive fire protection of steel corrugated beams of buildings. Technological effect is achieved by conducting firing tests of steel construction by non-destructive methods; the evaluation of fire resistance of fire-proof elements of corrugated beams (corrugated web, upper and lower shelves is identified by the least fire-proof element of a welded I-beam. In this methodology fire resistance duration of the constituent elements of a welded I-beam with account of its fire protection ability is described with an analytic function taken as variables. These variables are intensity strength of stresses and the degree of fire protection of a compound element.

  12. Economic Analysis of USN-Based Data Acquisition Systems in Tall Building Construction

    Directory of Open Access Journals (Sweden)

    Hyunsu Lim

    2017-08-01

    Full Text Available The successful construction of tall buildings requires effective construction management based on various quantitative data. The recent development of ubiquitous sensor networks (USNs enables massive amounts of data to be collected in real-time. However, the application of USN-based data acquisition systems to repetitive tasks on typical floors of tall buildings can be inefficient, because this may involve the repetitive reinstallation of sensors and the repositioning of data loggers and routers to enable continuous data transfer. To minimize this cumbersome work, a modified data acquisition method using reusable sensor nodes and mobile devices can be a useful solution. This study analyzes the economic aspects of the USN-based systems for concrete temperature monitoring by using the activity-based costing technique. The case study shows that the modified system can reduce the process cost by about 19%. It can also reduce the resource input time of management by about 55%, freeing up time for other management activities. Moreover, the cost benefits should scale up as projects increasingly require more measurement and monitoring. This study should facilitate the application of USN-based information management systems, particularly for tall building construction.

  13. The institutionalization of benchmarking in the Danish construction industry

    DEFF Research Database (Denmark)

    Rasmussen, Grane Mikael Gregaard; Gottlieb, Stefan Christoffer

    , the chapter accounts for the data collection methods used to conduct the empirical data collection and the appertaining choices that are made, based on the account for analyzing institutionalization processes. The analysis unfolds over seven chapters, starting with an exposition of the political foundation...... and disseminated to the construction industry. The fourth chapter demonstrates how benchmarking was concretized into a benchmarking system and articulated to address several political focus areas for the construction industry. BEC accordingly became a political arena where many local perspectives and strategic...... emerged as actors expressed diverse political interests in the institutionalization of benchmarking. The political struggles accounted for in chapter five constituted a powerful political pressure and called for transformations of the institutionalization in order for benchmarking to attain institutional...

  14. Modelling of energy consumption at construction of high-rise buildings

    Directory of Open Access Journals (Sweden)

    Korol Elena

    2018-01-01

    Full Text Available High-rise building structures in the course of its erection suppose primary use of methods provided for erection, concrete and external finishing works. Erection works do not differ significantly from usual ones: traditional equipment, accessories and techniques are used which are based on erection of structures in project position using a crane. Structures to be assembled in building frame include steel columns and beams, wall panels, form elements of columns, walls and floor structures. We can note heightened attention to operational control for quality of erection, but it is attributable to all works in the course of high-rise construction. During high-rise erection by means of cast in-situ reinforced concrete all formworks to be used do not have any special differences except systems specially designed for high-rise erection using sliding formwork or vertical traveling forms. In these systems special attention is paid to safety of elevated works. Working methods of placement and curing of concrete and structures as a whole remain traditional – the requirements for controlling such operations become toughened. The most evident differences in high-rise erection with regard to equipment, machinery and accessories used are in means provided for load transportation and safety of works at heights. Particularity of internal finishing works which are also obligatory during construction of skyscrapers allows not considering them in as technological differences from usual construction as far as the «height» of its execution is limited by height of particular floor and determined by price and building class.

  15. Modelling of energy consumption at construction of high-rise buildings

    Science.gov (United States)

    Korol, Elena; Korol, Oleg

    2018-03-01

    High-rise building structures in the course of its erection suppose primary use of methods provided for erection, concrete and external finishing works. Erection works do not differ significantly from usual ones: traditional equipment, accessories and techniques are used which are based on erection of structures in project position using a crane. Structures to be assembled in building frame include steel columns and beams, wall panels, form elements of columns, walls and floor structures. We can note heightened attention to operational control for quality of erection, but it is attributable to all works in the course of high-rise construction. During high-rise erection by means of cast in-situ reinforced concrete all formworks to be used do not have any special differences except systems specially designed for high-rise erection using sliding formwork or vertical traveling forms. In these systems special attention is paid to safety of elevated works. Working methods of placement and curing of concrete and structures as a whole remain traditional - the requirements for controlling such operations become toughened. The most evident differences in high-rise erection with regard to equipment, machinery and accessories used are in means provided for load transportation and safety of works at heights. Particularity of internal finishing works which are also obligatory during construction of skyscrapers allows not considering them in as technological differences from usual construction as far as the «height» of its execution is limited by height of particular floor and determined by price and building class.

  16. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    Science.gov (United States)

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  17. Development of national standards related to the integrated safety and security of high-rise buildings

    Science.gov (United States)

    Voskresenskaya, Elena; Vorona-Slivinskaya, Lubov

    2018-03-01

    The article considers the issues of developing national standards for high-rise construction. The system of standards should provide industrial, operational, economic and terrorist safety of high-rise buildings and facilities. Modern standards of high-rise construction should set the rules for designing engineering systems of high-rise buildings, which will ensure the integrated security of buildings, increase their energy efficiency and reduce the consumption of resources in construction and operation.

  18. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  19. The occupational safety on the construction sites of the farm production buildings in Finland

    Directory of Open Access Journals (Sweden)

    M. Hellstedt

    2013-09-01

    Full Text Available The size of farms has increased considerably during Finland's EU membership. The growth has meant big investments in the new production buildings. The buildings have been switched to big industrialhall- like constructions from small-scale ones which have contained own timber and own work contribution. The objective of the project financed by Farmers' Social Insurance Institution was to improve occupational safety on farm building construction and renovation sites by disseminating current safety practices and by developing ways of action which are better than the prevailing ones. The project consisted of a literature review, statistical analysis, as well as a farmer and designer interviews. In the statistical analysis the MATA occupational injuries insurance claims database on farmers’ claims during construction and renovation work for the years 2005 - 2008 was compared with the register of Federation of Accident Insurance Institutions on the construction workers' injuries. In comparing the reasons of the accidents a clear difference was found; poor scaffoldings and ladders are still the main culprits on farm accidents. Farmer interviews were used to assess occupational safety measures on the construction site, occurred injuries and their types, nearmiss situations and the underlying factors which have led to the injuries. Also construction safety deficiencies as well as the direct and indirect costs caused for instance because of the delay in completion of construction project were discussed. Designer interviews aimed to find out how occupational safety and health considerations are taken into account in farm building planning and counseling, and how this experience of the designers should be utilized in order to improve safety at the construction sites on farms. Farmers knew their obligations on occupational safety poorly. The situation was further worsened by the fact that on the site the supervisor tasks were only nominally executed. The

  20. Product modeling standards for the building and construction industry : Past, present and future

    NARCIS (Netherlands)

    Tolman, F.P.

    1999-01-01

    For the past ten years most sectors of industry have been developing standards for the electronic sharing and exchange of product model data. While several related industries, such as automotive and shipbuilding manufacturing have been relatively successful in integrating electronic product models