  1. Natural-gas-powered thermoelectricity as a reliability factor in the Brazilian electric sector

    International Nuclear Information System (INIS)

    Fernandes, E.; Oliveira, J.C.S. de; de Oliveira, P.R.; Alonso, P.S.R.

    2008-01-01

    The introduction of natural-gas-powered thermoelectricity into the Brazilian generation sector can be considered as a very complex energy, economic, regulatory and institutional revision. Brazil is a country with very specific characteristics in electricity generation, as approximately 80% of the generating capacity is based on hydroelectricity, showing strong dependency on rain and management of water reservoirs. A low rate of investment in the Brazilian Electricity Industry in the period of 1995-2000, associated with periods of low rainfall, led to a dramatic lowering of the water stocks in the reservoirs. With this scenario and the growing supply of natural gas, both from within Brazil and imported, natural gas thermal electric plants became a good option to diversify the electrical supply system. In spite of the Brazilian Government's efforts to install such plants, the country was faced with severe electricity rationing in 2001. The objective of this work is to show the need to continue with the implementation of natural gas thermal electricity projects, in a manner that allows flexibility and guarantees greater working reliability for the entire Brazilian electricity sector. Taking into account the world trend towards renewable energy, the perspectives of usage of biofuels in the Brazilian Energy Matrix and in electrical energy generation are also analyzed. The very issue of electrical power efficiency in Brazil and its challenges and strategic proposals from the standpoint of Government Programs and results provided so far are presented. The technological constraints in order to put on stream the thermal electric plants are also analyzed. The article concludes with a positive perspective of the usage of natural gas as to be the third pillar in the Brazilian Energy Matrix for the years to come

  2. Improvement of the electric power sector through the access to the national power transmission system - SINTREL (Brazilian National System of Electric Power Transmission); Aperfeicoamento do setor de energia eletrica atraves do acesso a transmissao - SINTREL (Sistema Nacional de Transmissao de Energia Eletrica)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    This report presents the organization and the operation of SINTREL (Brazilian National System of Electric Power Transmission), the national power transmission system, and it defines its function in the process of reform of the Brazilian electric sector. Besides showing the traditional organization of the companies and of the electric system, and the evolution of the organization of the Brazilian electric system to favor the competition.

  3. EFFECTS OF THE PENETRATION OF WIND POWER IN THE BRAZILIAN ELECTRICITY MARKET

    Directory of Open Access Journals (Sweden)

    Milton M. Herrera

    2016-12-01

    Full Text Available Climate variability has been the main driver for renewables in the Brazilian electricity market. This article analyzes the vulnerabilities of the dependence on hydropower in renewable energy production due to climate variation, as well as wind power penetration in Brazil, given a set of wind industry policies. Despite Brazilian renewable energy increase, the study shows the impact in energy supply in north region, due to the lack of transmission infrastructure. In Brazil, the potential trade-offs between renewables growth, and transmission infrastructure inconsistencies in terms of policy implementation are not yet well analyzed. Simulation results show the potential conflicts between energy policies aimed at increasing the wind power supply and boundaries in transmission infrastructure.

  4. Effects of the penetration of wind power in the brazilian electricity market

    Directory of Open Access Journals (Sweden)

    Milton M. Herrera

    2016-12-01

    Full Text Available Climate variability has been the main driver for renewables in the Brazilian electricity market. This article analyzes the vulnerabilities of the dependence on hydropower in renewable energy production due to climate variation, as well as wind power penetration in Brazil, given a set of wind industry policies. Despite Brazilian renewable energy increase, the study shows the impact in energy supply in north region, due to the lack of transmission infrastructure. In Brazil, the potential trade-offs between renewables growth, and transmission infrastructure inconsistencies in terms of policy implementation are not yet well analyzed. Simulation results show the potential conflicts between energy policies aimed at increasing the wind power supply and boundaries in transmission infrastructure.

  5. Direct external investment in the Brazilian electric power sector

    International Nuclear Information System (INIS)

    Pinto Junior, Helder Queiroz; Silveira, Joyce Perin; Losekann, Luciano Dias

    1999-01-01

    The central issue of debate was the need to align the energy sector's options and organization with changing global patterns of economic and social development, characterized by the increasing role played by the private sector, greater integration in the world economy, and new economic and social priorities such as efficiency, decentralization, deregulation, and a closer attention to environmental issues. The aim of the work was to identify the foreign investors participants of Brazilian privatization in the electric power sector and to analyze their strategies

  6. The restructuring of the Brazilian electric power sector and the universal access to the electric power service

    International Nuclear Information System (INIS)

    Santos, Rosana Rodrigues dos; Mercedes, Sonia Seger P.; Sauer, Ildo Luis

    1999-01-01

    The central issue of debate was the need to align the energy sector's options and organization with changing global patterns of economic and social development, characterized by the increasing role played by the private sector, greater integration in the world economy, and new economic and social priorities such as efficiency, decentralization, deregulation, and a closer attention to environmental issues. The aim of the work was to overview the restructuring of the Brazilian electric power sector. Tariffs are also commented

  7. Integrating competition and planning: A mixed institutional model of the Brazilian electric power sector

    International Nuclear Information System (INIS)

    Bajay, S.V.

    2006-01-01

    During the past decade, the Brazilian electric power sector went through similar institutional changes taken place in both developing and developed countries. The main goals for such changes were to inject competition into the generation and supply links of the sector's production chain and to reduce public debt via privatization of state-owned utilities that dominated the pre-reform sector. This paper discusses why these changes took place in Brazil and explains why the results of the reform model implemented by the previous federal administration were unsatisfactory. The current federal administration has substantially altered the prior model, aiming to remedy insufficient private investment in new power stations that caused a serious power shortage in 2001. The paper addresses the main characteristics of the new model, which implements (a) public biddings of new power plants for all distribution utilities in the country, and (b) forward planning of optimal commissioning times and capacity of new plants. The paper ends with a discussion of the potential benefits and drawbacks of the new scheme and the role of the regulator in the early stage of the ongoing transition in the Brazilian electrical power industry. (author)

  8. 2015 Plan. Project 2: the electric power sector and the Brazilian economy: insertion and forecasts

    International Nuclear Information System (INIS)

    1993-05-01

    This project shows the economic and the energetic view of the Brazilian electric power sector, mentioning the actual conjuncture; the economy evolution; some sector forecasts; demographical aspects; international price of petroleum and National Energetic Matrix. (C.G.C.)

  9. Globalization, economy financing model crisis and the institutional re-structuration of the Brazilian electric power system; Globalizacao, crise do padrao de financiamento da economia e reestruturacao institucional do setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Maciel, Claudio Schuller

    1996-12-31

    This thesis discusses the crisis in the Brazilian economical financing model and the consequent re-structuration of the Brazilian electric power system, giving special emphasis to: global historical factors; the new economic order; and, the consequences of the financial crisis in the Brazilian electric power system. In addition, it suggests new strategies for the institutional reformulation of the Brazilian electric power system 226 refs., 13 tabs.

  10. Globalization, economy financing model crisis and the institutional re-structuration of the Brazilian electric power system; Globalizacao, crise do padrao de financiamento da economia e reestruturacao institucional do setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Maciel, Claudio Schuller

    1995-12-31

    This thesis discusses the crisis in the Brazilian economical financing model and the consequent re-structuration of the Brazilian electric power system, giving special emphasis to: global historical factors; the new economic order; and, the consequences of the financial crisis in the Brazilian electric power system. In addition, it suggests new strategies for the institutional reformulation of the Brazilian electric power system 226 refs., 13 tabs.

  11. Electric power conservation in Brazil

    International Nuclear Information System (INIS)

    Hollanda, J.B. de

    1989-01-01

    The Brazilian Electric Power Conservation Program (PROCEL) is discussed. The main objective of this program is the optimization of electric power use, including consideration about prices, technology development and legislation. (M.V.M.)

  12. The insertion perspective of electric power independent producer in the Brazilian electric power sector; A perspectiva da insercao do produtor independente de energia eletrica no setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Borelli, Alessio Bento; Bermann, Celio [Sao Paulo Univ., SP (Brazil). Programa Interunidades de Pos-Graduacao em Energia]. E-mail: mborelli@netpoint.com.br; cbermann@iee.usp.br

    1999-07-01

    The central issue of debate was the need to align the energy sector's options and organization with changing global patterns of economic and social development, characterized by the increasing role played by the private sector, greater integration in the world economy, and new economic and social priorities such as efficiency, decentralization, deregulation, and a closer attention to environmental issues. The aim of this work is to evaluate the electric power independent producer participation in Brazilian electric power sector.

  13. Experience of electric power conservation in COELBA (Bahia Electric Company)

    International Nuclear Information System (INIS)

    Bastos, A.C.F.

    1990-01-01

    The electric power crisis of Brazilian north-east in 1987 imposes the Bahia Electric Company-COELBA to management a electric power conservation. The institutional, organizational and operational aspects are presented, including the tariff system, the market, the consumption and the relation with public. (author)

  14. Monthly bulletin of electric power market - November 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This bulletin deals with the brazilian electric power consumption in November 1988, containing data about the total consumption, the growth rates, the special tariffs and monthly evolution in each brazilian region. The economic indexes of industrial production, the market and the prices of electric power and petroleum products are also presented. (C.G.C.)

  15. Monthly bulletin of electric power market - July 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This bulletin deals with the brazilian electric power consumption in July 1988, containing data about the total consumption, the growth rates, the special tariffs and monthly evolution in each brazilian region. The economic indexes of industrial production, the market and the prices of electric power and petroleum products are also presented. (C.G.C.)

  16. Monthly bulletin of electric power market - September 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This bulletin deals with the brazilian electric power consumption in September 1988, containing data about the total consumption, the growth rates, the special tariffs and monthly evolution in each brazilian region. The economic indexes of industrial production, the market and the prices of electric power and petroleum products are also presented. (C.G.C.)

  17. Environmental degradation costs in electricity generation: The case of the Brazilian electrical matrix

    International Nuclear Information System (INIS)

    Alves, Laura Araujo; Uturbey, Wadaed

    2010-01-01

    The main purpose of this paper is to emphasize the importance of including environmental degradation costs in the long-term planning of the Brazilian electricity sector. To this aim, environmental external costs associated to both hydro-power and thermal-power electricity generation are investigated. Monetary valuation methodologies are applied and environmental degradation costs, expressed in per kWh of generated energy, are obtained for the main types of generation sources of the Brazilian electricity matrix. Both local pollution due to particulate matter emissions and global warming effects are assessed. A classification of the sources from the point of view of their impact on the environment is given. Degradation costs associated to the installed capacity expansion in the Brazilian electricity sector during the time horizon 2007-2016 are estimated. These resulting costs represent lower boundary damage estimates associated only with the energy to be generated during the period. Results indicate that local pollution caused by a small number of plants could be even more costly to society than global warming and, also, show the importance of considering not only unitary damage costs but the participation of each source on the generated energy during the time horizon, as a guide to planning and policy making.

  18. PROCEL`s, the Brazilian electric power holding company conservation program, revitalization process and electric power conservation achievements in the 2015 plan; O processo de revitalizacao do PROCEL e o alcance das metas de conservacao de energia eletrica no plano 2015

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Mario Fernando M.; Pimentel Filho, Geraldo; Costa Pinhel, Antonio Carlos da [ELETROBRAS, Rio de Janeiro, RJ (Brazil). PROCEL

    1995-12-31

    The expected increasing of electric power consumption in Brazil from 1995 to 2005 will require investments in the electric power supply expansion of about US$170 billions. In case electric power conservation procedures may be effectively adopted, there might be a reduction in these investments up to US$34 billions. This work discusses how the revitalization of PROCEL, the Brazilian program of electric power conservation, is being conducted in order to achieve such objective 1 fig., 2 tabs., 4 refs.

  19. Applied risk analysis to the future Brazilian electricity generation matrix

    Energy Technology Data Exchange (ETDEWEB)

    Maues, Jair; Fernandez, Eloi; Correa, Antonio

    2010-09-15

    This study compares energy conversion systems for the generation of electrical power, with an emphasis on the Brazilian energy matrix. The financial model applied in this comparison is based on the Portfolio Theory, developed by Harry Markowitz. The risk-return ratio related to the electrical generation mix predicted in the National Energy Plan - 2030, published in 2006 by the Brazilian Energy Research Office, is evaluated. The increase of non-traditional renewable energy in this expected electrical generating mix, specifically, residues of sugar cane plantations and wind energy, reduce not only the risk but also the average cost of the kilowatt-hour generated.

  20. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil)

    International Nuclear Information System (INIS)

    Correia, S.P.S.

    1991-01-01

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab

  1. The Perspective of Small and Medium Size Nuclear Power Reactors in the Brazilian Isolated Electricity Grids

    International Nuclear Information System (INIS)

    Moutinho dos Santos, E.

    1998-01-01

    As a consequence of the international crisis that has shaken the nuclear industry almost all over the world during the late 1980s, new academic contributions, which could settle a new basis for the nuclear energy in Brazil, have been scarce. This paper aims to partially fulfill this gap. We discuss some perspectives for the nuclear option to regain some prominence in the Brazilian energy matrix. Recent developments in the nuclear industry, including advances in plant design, have been opening interesting markets for small and medium nuclear power reactors (SMNPRs). We access the suitability and feasibility of such new technology in the Brazilian isolated electricity grids. We conclude by saying that, although the difficulties are still huge, SMNPRs may be a good strategy for Brazil to revitalize its nuclear policy. (author)

  2. The Brazilian electric power industry restructuring: an evaluation of the competition through the contestable market theory

    International Nuclear Information System (INIS)

    Vinhaes, Elbia; Santana, Edvaldo de

    1999-01-01

    The central issue of debate was the need to align the energy sector's options and organization with changing global patterns of economic and social development, characterized by the increasing role played by the private sector, greater integration in the world economy, and new economic and social priorities such as efficiency, decentralization, deregulation, and a closer attention to environmental issues. The aim of the work is to evaluate the competition in the Brazilian electric power industry through the Contestable Market Theory proposed by Baumol

  3. The Brazilian electric power market: historic and forecasting

    International Nuclear Information System (INIS)

    Carvalho Afonso, C.A. de; Azevedo, J.B.L. de

    1992-01-01

    A historical analysis of electric power market evolution in Brazil and in their regions during 1950 to 1990, is described, showing the forecasting for the next ten years. Some considerations about population, energy conservation and industrial consumers are also presented, including statistical data of the electrical power market. (C.G.C.)

  4. SIESE - trimestrial bulletin - Synthesis 1994. Electric power summary statistics for Brazil

    International Nuclear Information System (INIS)

    1994-01-01

    The performance of the power system of all the Brazilian electrical utilities is presented. The data is given for each region in the country and includes, among other things, the electric power consumption and generation; the number of consumers and the electric power rates. 10 figs., 42 tabs

  5. Nuclear energy generation and the safety criteria for Brazilian power plants

    International Nuclear Information System (INIS)

    Silva, Gustavo Brandão e

    2016-01-01

    The purpose of this paper is to show how the use of nuclear technology can help to diversify the national electricity matrix in a sustainable and efficient way. For this, an analysis of the current situation of the Brazilian electric sector will be made, exposing its fragilities and highlighting the advantages of the nuclear source as an alternative to integrate the necessary thermoelectric base to the reliable supply of electricity in the country. In addition, the objective of the work is to detail the process of exploiting atomic energy in Brazil from raw material mining, through the stages involving the manufacture of nuclear fuel, to the current operation and situation of Brazilian power plants. By taking the Angra 2 Nuclear Power Plant as a case study, the safety criteria adopted in its design and operation will be highlighted. Particular attention will also be given to the electric supply alternatives and to the active safety systems of the plant

  6. The stochastic effects on the Brazilian Electrical Sector

    International Nuclear Information System (INIS)

    Ferreira, Pedro Guilherme Costa; Oliveira, Fernando Luiz Cyrino; Souza, Reinaldo Castro

    2015-01-01

    The size and characteristics of the Brazilian Electrical Sector (BES) are unique. The system includes a large-scale hydrothermal power system with many hydroelectric plants and multiple owners. Due to the historical harnessing of natural resources, the National Interconnected System (NIS) was developed outside of the economic scale of the BES. The central components of the NIS enable energy generated in any part of Brazil to be consumed in distant regions, considering certain technical configurations. This interconnection results in a large-scale complex system and is controlled by robust computational models, used to support the planning and operation of the NIS. This study presents a different vision of the SEB, demonstrating the intrinsic relationship between hydrological stochasticity and the activities executed by the system, which is an important sector of the infrastructure in Brazil. The simulation of energy scenarios is crucial to the optimal manner to operate the sector and to supporting decisions about whether expansion is necessary, thus, avoiding unnecessary costs and/or losses. These scenarios are an imposing factor in the determination of the spot cost of electrical energy, given that the simulated quantities of water in the reservoirs are one of the determinants for the short-term energy price. - Highlights: • The relationship between the hydrological regimes and the energy policy and planning in Brazil; • An overview about the stochastic effects on the Brazilian Electrical Sector; • The stochasticity associated with the Brazilian electrical planning; • The importance of hydro resources management for energy generation in Brazil;

  7. The Brazilian electrical system reform

    International Nuclear Information System (INIS)

    Mendonca, A.F.; Dahl, C.

    1999-01-01

    Although the Brazilian electrical system has been a public monopoly, the threat of electricity shortages from a lack of investment triggered a comprehensive reform. In 1993 the government began a series of laws, decrees and regulations reforming the tariff policy, allowing privatization of utilities, foreign investments and independent power producers, and creating an independent transmission grid and a new electricity regulatory agency (ANEEL). The new regulatory framework is not completely defined but the proposed model intends to transform bulk electricity supply into a competitive market similar to that adopted in England. Our objective is to evaluate whether the proposed reform will succeed in attracting the required private capital, will allow an unregulated wholesale electricity market and will require a strict regulatory framework. The reform has been quite successful in privatizing the distribution companies but is allowing monopolistic rents, and has failed until now to attract private investments to expand generation capacity. The risk of blackouts has increased, and the proposed wholesale electricity market may not be appropriate because of barriers to constructing new hydroelectric units, now 90% of the system. Therefore, a new regulatory framework and a strong regulatory agency with a well-defined tariff policy should have preceded the privatization. (author)

  8. Brazilian hybrid electric fuel cell bus

    Energy Technology Data Exchange (ETDEWEB)

    Miranda, P.E.V.; Carreira, E.S. [Coppe-Federal Univ. of Rio de Janeiro (Brazil). Hydrogen Lab.

    2010-07-01

    The first prototype of a hybrid electric fuel cell bus developed with Brazilian technology is unveiled. It is a 12 m urban-type, low-floor, air-conditioned bus that possesses three doors, air suspension, 29 seats and reversible wheelchair site. The bus body was built based on a double-deck type monoblock vehicle that is able to sustain important load on its roof. This allowed positioning of the type 3 hydrogen tanks and the low weight traction batteries on the roof of the vehicles without dynamic stabilization problems. A novel hybrid energy configuration was designed in such a way that the low-power (77 kWe) fuel cell works on steady-state operation mode, not responding directly to the traction motor load demand. The rate of kinetic energy regeneration upon breaking was optimized by the use of an electric hybrid system with predominance of batteries and also by utilizing supercapacitors. The electric-electronic devices and the security control softwares for the auxiliary and traction systems were developed in-house. The innovative hybrid-electric traction system configuration led to the possibility to decrease the fuel cell power, with positive impact on weight and system volume reduction, as well as to significantly decrease the hydrogen consumption. (orig.)

  9. Energetic transition in the electric sector: Brazilian case

    International Nuclear Information System (INIS)

    Jannuzzi, Gilberto de Martino

    1999-01-01

    The Brazilian electric sector is essentially based on a source of renewable energy -hydroelectricity, and the national economy has increased its dependence of the electricity. The use of the electricity for unit of GDP increased in continuous form from 1970 and the country has serious difficulties in the financing of the expansion of the electric production. Energetic politics, in what concerns to the sustainable development in the Brazilian case, should direct its efforts toward a bigger investment in efficiency and energy conservation. a bigger use of supply options that they are renewable and decentralized will depend on high degree of the regulation of the electric sector during the privatization. The transition stage of the Brazilian electric sector will imply more efforts toward a handling based on the demand and a bigger efficiency

  10. Planning the nuclear contribution to the Brazilian power program

    International Nuclear Information System (INIS)

    Barbalho, A. Rodrigues; Alves, R. Nazare; Pinto, C. Syllus M.; Souza Santos, T.D. de; Abrao, A.

    1977-01-01

    The thermo-electric power in Brazil accounts for less than 20% of the total generating capacity. Brazil's power is essentially generated hydraulically, which grants the growing development. The electric energy consumption keeps growing, with the annual average rate of 13%/year in the last five years. The present installed capacity is 20 000 MWe and the projections are: 35 000MWe, in 1980; 50 000 MWe in 1985; 75 000 MWe, in 1990 and 150 000 MWe, in 2 000. Most of the hydraulic resources are located in remote areas of the country, very far from the consumption centers. Under the agreement between the Federal Republic of Germany and Brazil (signed in June 1975), besides the nuclear power station, American made, under construction in Agra dos Reis, with a power capacity of 626 MWe, two more units, each one with 1 300 MWe capacity are to be erected at the same site, and planned to be in operation in 1982 and 1983. Several joint German-Brazilian companies will be established for reactor and fuel manufacture, in the country. The Brazilian state holding nuclear company, Empresas Nucleares Brasileiras S/A., NUCLEBRAS, will participate in the formation of all joint companies with at least 51% of capital investments. The Brazilian Government will spend 10 billion dollars (U.S.), during the agreement's duration, to make its industry stronger, to develop its technology and to reduce its dependence on energy imports. Brazil's target: full independence in nuclear technology (including reactor manufacture and complete fuel cycle) in about 15 years [es

  11. Planning and administration of human resources in Brazilian Electric Power Companies; Planejamento e administracao de recursos humanos nas empresas brasileiras do setor de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Devanir Vieira

    1985-12-01

    Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.

  12. 2015 Plan. Project 1: methodology and planning process of the Brazilian electric sector expansion

    International Nuclear Information System (INIS)

    1993-10-01

    The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.)

  13. Generation potential of electric power surplus with the biogas produced from anaerobic bio digestion of vinasse in Brazilian sugar-ethanol industry; Potencial de geracao de excedentes de energia eletrica com o biogas produzido a partir da biodigestao da vinhaca na industria sucro-alcooleira brasileira

    Energy Technology Data Exchange (ETDEWEB)

    Lamonica, Helcio Martins [Universidade Estadual de Campinas (DE/FEM/UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica. Dept. de Energia

    2006-07-01

    This work evaluates the electric power potential of the Brazilian sugarcane industry using the biogas produced by vinasse biodigestion in internal combustion engine driven generators. The electric power surplus based on crop 2004/05 ethanol production data is 9,292 TJ/year (2.6 TWh/year), 0.75% of the total electric power consumption in Brazil during the year of 2003. In spite of its considerable potential the determined minimum selling price for its produced energy of R$ 89.98/GJ (R$ 323.92/MWh) is expensive for present Brazilian electric power market price. (author)

  14. The convergence of the natural gas industry and electric power industry: the Brazilian case; Convergencia entre a industria do gas natural e a industria de energia eletrica: o caso brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Jose Ricardo Uchoa Cavalcanti [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Programa de Planejamento Energetico

    2008-07-01

    The main purpose of this paper is to analyze the convergence between power (electric sector) and natural gas industries in Brazil. It also shows how this convergence happens in the USA market and its applicability in the Brazilian market. At the end some conclusions and suggestions are presented to satisfy the Brazilian market, which behaves in a different way as the USA market, i.e. the Brazilian market does not follow seasonal pattern but an aleatory pattern in thermoelectric plants. (author)

  15. Wasp-II application to Brazilian Electric System

    International Nuclear Information System (INIS)

    Sakamoto, L.H.

    1980-01-01

    In the next years, the expansion of the Brazilian Electric System will occur in two large sub-systems struture: South-Southeast and North-Northeast. The interconnection between these systems is uncertain due to long distance between then. Hence, it seems more reasonable to study them separately and the South-Southeast System was chosen because it is more important from the economic point of view. Some information concerning input data used in this study was estimated, therefore a thorough review of them must be done for more for more conclusive results. Hydro, coal and nuclear power plants were considered as candidates for an expansion plan starting in 1987 to 2000. (author) [pt

  16. WASP-II Aplication to Brazilian electric system

    International Nuclear Information System (INIS)

    Sakamoto, L.H.

    1980-12-01

    In the next years, the expansion of the Brazilian Electric System will occur in a two large sub-systems structure: South-Southeast and North-Northeast. The interconnection between these systems are uncertain due the long distance between them. Hence, it seems more reasonable to study separately and the South-Southeast System was chosen because it is more important from the economic point of view. Some information concerning input data used in this study was estimated, therefore a thorough review of them must be done for more conclusive results. Hydro, coal and nuclear power plants were considered as candidates for an expansion plan starting in 1987 up to 2000. (Author) [pt

  17. Nuclear policy retrospection in Brazil and forecasting for using of small nuclear power plants - SNPs - in the Brazilian electric system

    International Nuclear Information System (INIS)

    Santos, E.M. dos.

    1992-02-01

    This thesis highlights the nuclear energy perspectives to regain a prominent place in the world energy mix, as a competitive and safe energy source. Just considering the current international changes in the nuclear power features in the developed countries, it is assessed the suitability and feasibility of defining a new nuclear policy in Brazil, based on the development of small and medium nuclear power reactors - SMNPR. The SMNPR's may be a good nuclear strategy for Brazil to develop a national and evolutionary reactor design with several improvements in safety, by means of passive safety systems. This reactor may play a significant role in the brazilian electrical system in the long term. (author)

  18. Energy commercialization in the new environment of the Brazilian electric power sector. A methodology for production allocation strategies analysis

    International Nuclear Information System (INIS)

    Ramos, Dorel Soares; Lima, Wagner da Silva

    1999-01-01

    The restructuring of the Brazilian Electric Sector has modified the rules for purchase and sale of energy, resulting in the creation of the Wholesale Energy Market. In this new context, the decision of the exposure level to the spot market price and the purchase of energy through bilateral contracts becomes so much a strategic variable for consumers or dealers, as for hydro and thermal generators. This work presents a methodology for planning of energy commercialization envisaging purchase and sale energy opportunities provided by the new Regulatory Framework of the Brazilian Electric Sector. (author)

  19. Insertion of the free consumers in the Brazilian electrical sector: challenges and opportunities; Insercao dos consumidores livres no setor eletrico brasileiro: desafios e oportunidades

    Energy Technology Data Exchange (ETDEWEB)

    Chaves, Cristiane Padilha

    2010-03-15

    This thesis analyses the role of free consumers in the Brazilian Electric Power Sector. Therefore, it evaluates the role of free consumers in other markets worldwide and analyses the current Brazilian regulatory framework that was introduced in 2004. The current model has replaced the one adopted in the 1990s, when the first reform of the Brazilian Electricity Sector occurred. To assess the role of free consumers in the electricity sector, this work analyses the benefits that this kind of consumers perceive and the risks they are exposed to when they switch from the captive market and go towards the open market. It also evaluates the influence of free consumers over the other industry agents: generators, distributors, retail consumers and society. It also identifies new options for free consumers in the Brazilian electric energy (author)

  20. The influence of Goiania radiological accident on Brazilian public opinion concerning new nuclear electric plants

    International Nuclear Information System (INIS)

    Meldonian, Nelson Leon; Mattos, Luis Antonio Terribile de

    1997-01-01

    The Brazilian society is against applications of nuclear energy, mainly respecting to construction of new nuclear power plants, believing that they are harmful to population's welfare and the environment. By this reason, Brazilian nuclear sector would promote a more intensive program of public discussion, not limited to technical and scientific community. Intending to contribute to a better judgment by society about the differences between diverse employment of nuclear energy, arguments concerned to its benefits are presented, pointing out that adverse accounts to nuclear electricity based on Goiania radiological accident, are not justified

  1. Potential of exchange of electric power between the electric systems of Brazil and Argentina; Potencial de intercambio de energia eletrica entre os sistemas eletricos do Brasil e da Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Zanette, Andre Luiz [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2010-07-01

    Integration of power generation and transmission systems can provide a better utilization of energy resources and increase systems reliability. Given that Brazilian interconnection with Argentina, which represents the major Brazilian interconnection with neighboring countries, is used basically in winter months or in situations of unfavorable hydrology, this paper aims to demonstrate that power exchange between these two countries can be much higher than currently observed, resulting in greater benefits for producers and consumers of electricity in both countries, and that these benefits can also be obtained through better use of existing and planned interconnections between South American countries. To estimate the potential for power exchange between the electrical systems of Brazil and Argentina, three sets of simulations using the Brazilian Energy Plan (PDE 2010-2019) deck for Newave model, available from EPE, were made. These simulations consider the possibility that: (i) electricity is exported from Brazil to Argentina (II) electricity is imported from Argentina and (III) electricity is exchanged in both directions. The simulation results indicate that, despite rising operational marginal costs, significant amounts of electricity can be exported to Argentina at relatively low prices, depending on hydrological conditions. Moreover, the possibility of electricity imports from Argentina can reduce the operational costs of Brazilian system, as well as minimizing the risk of shortages. This work shows that the interconnections between Brazil and Argentina may be better used to benefit producers and consumers in both countries. Therefore, it is necessary to define an effective contractual and operational model for power trading and electricity transfer between these countries with the objective of promoting stability and mutual trust. Finally, studies to evaluate the potential for electricity exchange between South American countries are specially important

  2. Potential of exchange of electric power between the electric systems of Brazil and Argentina; Potencial de intercambio de energia eletrica entre os sistemas eletricos do Brasil e da Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Zanette, Andre Luiz [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2010-07-01

    Integration of power generation and transmission systems can provide a better utilization of energy resources and increase systems reliability. Given that Brazilian interconnection with Argentina, which represents the major Brazilian interconnection with neighboring countries, is used basically in winter months or in situations of unfavorable hydrology, this paper aims to demonstrate that power exchange between these two countries can be much higher than currently observed, resulting in greater benefits for producers and consumers of electricity in both countries, and that these benefits can also be obtained through better use of existing and planned interconnections between South American countries. To estimate the potential for power exchange between the electrical systems of Brazil and Argentina, three sets of simulations using the Brazilian Energy Plan (PDE 2010-2019) deck for Newave model, available from EPE, were made. These simulations consider the possibility that: (i) electricity is exported from Brazil to Argentina (II) electricity is imported from Argentina and (III) electricity is exchanged in both directions. The simulation results indicate that, despite rising operational marginal costs, significant amounts of electricity can be exported to Argentina at relatively low prices, depending on hydrological conditions. Moreover, the possibility of electricity imports from Argentina can reduce the operational costs of Brazilian system, as well as minimizing the risk of shortages. This work shows that the interconnections between Brazil and Argentina may be better used to benefit producers and consumers in both countries. Therefore, it is necessary to define an effective contractual and operational model for power trading and electricity transfer between these countries with the objective of promoting stability and mutual trust. Finally, studies to evaluate the potential for electricity exchange between South American countries are specially important

  3. Centralized vs. decentralized thermal IR inspection policy: experience from a major Brazilian electric power company

    Science.gov (United States)

    dos Santos, Laerte; da Costa Bortoni, Edson; Barbosa, Luiz C.; Araujo, Reyler A.

    2005-03-01

    Furnas Centrais Elétricas S.A is one of the greatest companies of the Brazilian electric power sector and a pioneer in using infrared thermography. In the early 70s, the maintenance policy used was a centralized approach, with only one inspection team to cover all the company"s facilities. In the early 90s, FURNAS decided to decentralize the thermography inspections creating several inspection teams. This new maintenance policy presented several advantages when compared to the previous one. However the credibility of the results obtained with the thermal inspection was frequently being questioned, in part due to the lack of a detailed planning to carry out the transition from the centralized inspection to the decentralized one. In some areas of the company it was suggested the inactivation of the thermography. This paper presents the experience of FURNAS with these different maintenance policies and details the procedures which have been taken that nowadays the infrared thermal inspection has become one of the most important techniques of predictive maintenance in the company.

  4. A proposal for evaluation of the owner capital cost for the Brazilian electric power sector; Uma proposta de avaliacao do custo do capital proprio para o setor de energia eletrica brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Serrano, Ricardo Oliveira L.

    2003-12-01

    This work studies the owner capital cost of the brazilian electric sector, according to three methods: Comparable Accounting Earnings, that uses historical values in its measuring and Discounted Cash Flow (DCF) and the Capital Asset Pricing Model (CAPM), elaborated from the expected values. The obtained results by using the CAE method showed that the Brazilian electric sector has not been rewarded in its real necessity of maintenance and expansion. From this observation, it was considered appropriated not to take this method in the methodology presently proposed, which will be using only the single average of the CAPM and DCF models. The use of the results single average of this model presents the advantage of selecting specific characteristics of each one, and diluting the effects of occasional peak values. The owner capital cost obtained from this work was the average value of 19.73% for the studied period - 1995/2003 (17.12% for 2003), proximate to the obtained result by ANEEL - brazilian agency of electric power - for investments in energy distribution in Brazil, 17.47%, while Minardi and Sanvicente (2003) obtained 36.06% for the owner capital cost of CEMIG in 2002, specifically.

  5. Energy policy and regional inequalities in the Brazilian economy

    International Nuclear Information System (INIS)

    Santos, Gervasio F.; Haddad, Eduardo A.; Hewings, Geoffrey J.D.

    2013-01-01

    The objective of this paper is to evaluate the long-run regional impacts of the tariff policy of the Brazilian electric power sector. This sector has undergone a reform process that started in the 1990s. Since the beginning of the reform, two spatial trends of distribution of electric power tariffs have emerged among the Brazilian states, one of convergence and another of spatial divergence. These trends have been guided by the new electric power tariff policy and by the spatial features of the Brazilian economy, which is marked by a high degree of spatial concentration and hierarchical distribution of large markets. In addition, because of the presence of strong economies of scale, the recent electric power prices differentials might be caused by differentials in market size that provide better conditions for the achievement of economies of scale for electric power utility companies located in larger markets. Given the role of electric power as an important intermediate input in the production process and the interdependence between sectors, an Energy Interregional Computable General Equilibrium model was used to simulate the long-run regional impacts of electric power tariff policy in Brazil. The simulations showed that the heterogeneity of energy-intensity and the differentials of energy substitution drive the spatial impacts of changes in electric power prices. On the other hand, the recent trend of spatial dispersion of electric power prices might contribute to a decrease in the long-run economic growth and to an increase in the regional inequalities in Brazil. - Highlights: ► We model the regional impacts of tariff policy of the electric power sector in Brazil. ► High electric power tariffs increases in regions with higher electric-power-intensity. ► Heterogeneity of energy supply determines an unequal pattern of energy substitution. ► Low possibilities of energy substitution generate the most negative economic impacts

  6. Resources transfer and centralization in Brazilian electrical sector: the reversion global reserve (RGR) and the guarantee global reserve (GGR)

    International Nuclear Information System (INIS)

    Souza Amaral Filho, J.B. de.

    1991-01-01

    This dissertation makes the analysis of resources transfer and centralization in Brazilian electrical sector, through reversion global reserve (RGR) and guarantee global reserve (GGR). RGR and GGR are funds. RGR finances sectorial investments in electric power and GGR aims the supply of deficient concessionaires. Governmental investments and the results of this application are showing. (M.V.M.). 55 refs, 2 figs, 61 tabs

  7. Genesis of the Brazilian nuclear power plants program

    International Nuclear Information System (INIS)

    Syllus, G.; Lepecki, W.

    1996-01-01

    The genesis of the Brazilian Nuclear Power Program is described by the authors - who participated in the events - from the beginning of the sixties, until the definition and the start of the implementation in 1975 of the Reference Nuclear Power Program. A description is made of the main events, studies and decisions that contributed to the evolution of the Program: the GTRP (Nuclear Power Plant Working Group); the Thorium Group; the Lane Group; the decision about Angra 1; CNEN's analyses about the reactor line and, finally, the creation of CBTN (Nuclear Technology Brazilian Company), which elaborated the studies that resulted in the final definition of the Program and led to the Brazilian German Agreement and the establishment of NUCLEBRAS. (author)

  8. Photovoltaic systems connected to electric power like distributed generators: the recent situation at the PVPS-IEA and at the Brazilian scenario; Sistemas fotovoltaicos conectados a rede eletrica como geradores distribuidos: a situacao recente no PVPS-IEA e no cenario brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Quaglia, Renato Brito; Oliveira, Sergio Henrique Ferreira de [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Sociais Aplicadas. Programa de Pos-Graduacao em Energia], email: renato.quaglia@ufabc.edu.br

    2008-07-01

    In this paper it is considered the use of Distributed Generation (GD) as a further option to centralized generation of electricity and treats its photovoltaic systems connected to power network (SFCR's) technology as an option in this interesting 'new' model to plan the expansion of the brazilian electrical energy matrix, mainly in urban centres. For this reason, it was necessary to mention the main characteristics of this technology as distributed generators, and the profile of his generation when connected in homes and commercial buildings. Moreover, it presents the benefits that these systems can offer the electricity sector, society and the economy. In the study of Photovoltaic Power Systems Programme (PVPS), specifically the situation of this technology in Germany, realized that the creation of mechanisms of financial incentives provided to implement some of the main barriers associated with the integration of photovoltaic systems as distributed generators. In assessing the Brazilian context, there was the incipient photovoltaic market in the country, even taking some systems already installed, note that the vast majority are intended for studies of Research and Development. There is also the exploitation of photovoltaic systems connected to the network for use in homes, businesses or industries, probably because of the lack of incentive programs for SFCR's. Although there is a programme of incentives to Alternative Sources of Electricity - Proinfa, it does not consider the SFCR's in its guidelines for qualification, only the wind systems, small hydroelectric plants and systems powered by biomass. Point is, therefore, the need for the creation of an energy policy that encourages the Brazilian market photovoltaic, more precisely a policy of offering incentives conditions of maturity of this technology when connected to the network - technical standards, decrease costs, creation of hand of specialized work, installation of manufacturers

  9. The nuclear contribution to the solution of Brazilian energy problem

    International Nuclear Information System (INIS)

    1995-01-01

    This report presents the justifying of Brazilian Nuclear Programme. Due to the demand increasing of electric energy in Brazil, the government decided to an alternative source. Although the brazilian electric power program continue basically hydroelectric, the nuclear power plants began to be constructed. The strategy adopted, the prospection of uranium enrichment, the project and construction of nuclear power plants, the responsibilities of Nuclebras and Nuclen and several stages of this program are described. (C.M.)

  10. Smart Grid Communication Technologies in the Brazilian Electrical Sector

    OpenAIRE

    Kühne, Philipp; Hauer, Ines; Styczynski, Zbigniew A.; Fernandes, Rubipiara; Vale, Zita

    2013-01-01

    Intelligent electrical grids can be considered as the next generation of electrical energy transportation. The enormous potential leads to worldwide focus of research on the technology of smart grids. This paper aims to present a review of the Brazilian electricity sector in context with the integration of communication technologies for smart grids. The work gives an overview of the generation, transmission and distribution of electrical energy in the Brazil and a brief summary ...

  11. Global power and Brazilian nuclear decisions

    Energy Technology Data Exchange (ETDEWEB)

    Metri, Paulo, E-mail: pmetri@terra.com.br [Clube de Engenharia, Rio de Janeiro, RJ (Brazil)

    2017-07-01

    Brazilian society declares no intention to development a nuclear artifact. This is on its Constitution. The submarine of nuclear propulsion may be used as a weapon of defense and, therefore, has a peaceful objective. Nationalism must be applied only to benefit the society. Nationalist attention has always been devoted, at various occasions, to the Brazilian nuclear sector. However, since Brazilian society has many needs and the Brazilian government always had numerous energy options, this sector has not been developed as it could be. Other successful applications of nuclear technology, besides electric generation, are not considered here. At present, the country is experiencing a moment of harassment of liberal forces. It is difficult to know if the population understands what is going on, due to the traditional media control. This media belongs to the capital. The rise and the fall of the nationalist strand in a country follow a global tendency and also depend of actions of the international capital. In nationalist periods, more decisions with positive social impact are taken. Therefore, sovereignty is necessary to increase the benefits to society. Unfortunately, the Brazilians deceived by the companies of mass communication and corrupt political leaderships allow the country to be dominated. Even the armed forces had their projects paralyzed. The nuclear sector, as all other, suffers with the low budget and the future is difficult to predict. (author)

  12. Global power and Brazilian nuclear decisions

    International Nuclear Information System (INIS)

    Metri, Paulo

    2017-01-01

    Brazilian society declares no intention to development a nuclear artifact. This is on its Constitution. The submarine of nuclear propulsion may be used as a weapon of defense and, therefore, has a peaceful objective. Nationalism must be applied only to benefit the society. Nationalist attention has always been devoted, at various occasions, to the Brazilian nuclear sector. However, since Brazilian society has many needs and the Brazilian government always had numerous energy options, this sector has not been developed as it could be. Other successful applications of nuclear technology, besides electric generation, are not considered here. At present, the country is experiencing a moment of harassment of liberal forces. It is difficult to know if the population understands what is going on, due to the traditional media control. This media belongs to the capital. The rise and the fall of the nationalist strand in a country follow a global tendency and also depend of actions of the international capital. In nationalist periods, more decisions with positive social impact are taken. Therefore, sovereignty is necessary to increase the benefits to society. Unfortunately, the Brazilians deceived by the companies of mass communication and corrupt political leaderships allow the country to be dominated. Even the armed forces had their projects paralyzed. The nuclear sector, as all other, suffers with the low budget and the future is difficult to predict. (author)

  13. Brazilian energy statistics - 1992. Annual bulletin of the Brazilian National Committee of the World Energy Council

    International Nuclear Information System (INIS)

    1992-01-01

    This bulletin deals with the primary sources that carry most weight in the Brazilian energy balance: hydraulic energy, petroleum, natural gas and coal. It contains data on ethyl alcohol derived from sugar cane since it is of special importance in Brazil's energy scenario. A brief picture of Brazil's electric power status with regard to bordering countries is also presented, giving an idea of the prospects for progress in electric power integration through the implementation of new international electric power interconnection projects. (author). 13 figs., 19 tabs

  14. Socio-environmental policy of Brazilian electric sector. Effects of environmental legislation

    International Nuclear Information System (INIS)

    Amaral, A.C.; Menezes, C.F.S.

    1993-01-01

    The great socio-environmental policies of Brazilian electric sector are presented, including the aspects of environmental legislation that affects the electric sector and the difficulties faced in order to adapting to this situation. The main problems that the electric sector has found to establishing its socio-environmental policies are also described. (C.M.)

  15. Reserve price: Lessons learned from Brazilian electricity procurement auctions

    International Nuclear Information System (INIS)

    Rego, Erik Eduardo

    2013-01-01

    Auctions have been used in several formats in the electric energy industry. In general, regulators may be uncomfortable initiating a reverse auction at a higher-than-expected final price, fearing that participants may sell their energy at an excess profitability. Nevertheless, evidence from electricity procurement auctions conducted in Brazil supports the findings that these types of auctions have the opposite effect. By attracting a larger number of agents, these auctions can trigger stronger competition and lead to lower settlement pricing. Accordingly, the Brazilian cases examined in this article present significant evidence to support this directional theory. In fact, there are some cases of electricity procurement auctions that show that inadequate auction reserve pricing leads to inefficient outcomes and may also cause the auction to fail. On the other hand, auctions with adequate price caps have led to lower final clearing prices, thus contributing to reasonable final energy pricing. - Highlights: • Outcomes from Brazilian electricity procurement auctions were analyzed. • Cases of success and frustration after adopting (in)adequate reserve prices. • Setting different price caps per source is inefficient. • Higher-than-normal price cap is more effective than fine-tuning reserve prices

  16. Comparison between Brazilian and Portuguese energy sceneries considering the importance of small hydroelectric power plants; Comparacao entre os cenarios energeticos brasileiros e portugueses considerando-se a implantacao de PCH's - Pequenas Centrais Hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Mariotoni, Carlos Alberto [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mail: cam@fec.unicamp.br; Mauad, Frederico Fabio [Sao Paulo Univ., Sao Carlos, SP (Brazil). Escola de Engenharia. Dept. de Hidraulica e Saneamento

    2000-07-01

    Both the Brazilian and the Portuguese energy systems have been subject of several transformations along the last years. That happened mainly because the re-definition of the electric sectors what makes possible the flexibility of the energy commercialization. There is another important point to be mentioned what is related to the end of the market monopoly before established by ELETROBRAS - Brazilian Electricity Generation Board and by EDP - Electricity of Portugal, determining a new relationship among the energy produces and consumers. A free market law to the energy sellers and buyers has been introduced. Therefore the businessman have been stimulated to invest in new energy sources and new energy power plants to get bigger profits as well as the consumers have been pushed to fight for lower prices and better qualities. Both the Brazilian and Portuguese Governments must keep the decision power to establish the national energy plans to get the country economic targets and to avoid the economic abuses and cartelization. The discussion presented aims to analyze the importance of the small hydroelectric power plants in both the Brazilian and the Portuguese electric systems considering the economic aspects and the social and environmental impacts. The recent modifications established by both national agencies of energy regulations: ANEEL (Brazil) - National Agency of Electric Power Companies and INAG (Portugal) - National Institute of Water, have been discussed in this paper. (author)

  17. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil); O novo modelo tarifario baseado no conceito de custos marginais em desenvolvimento para o setor eletrico brasileiro. Um estudo de caso para a Companhia Paulista de Forca e Luz

    Energy Technology Data Exchange (ETDEWEB)

    Correia, S P.S.

    1992-12-31

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab.

  18. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil); O novo modelo tarifario baseado no conceito de custos marginais em desenvolvimento para o setor eletrico brasileiro. Um estudo de caso para a Companhia Paulista de Forca e Luz

    Energy Technology Data Exchange (ETDEWEB)

    Correia, S.P.S.

    1991-12-31

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab.

  19. Analysis of constraints to the introduction of LNG plants in the Brazilian electric sector; Analise dos condicionantes para a introducao de plantas a GNL no setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Cortes, Tatiane Moraes Pestana

    2010-03-15

    This work aims analyze the constraints to the introduction of LNG in the Brazilian energy matrix. Therefore, considers the current regulatory framework and the investments recently made by PETROBRAS to acquire LNG in the international market in order to supply power plants in the country. In order to assess the current status of the LNG plants in the electricity sector, factors are analyzed in terms of the natural gas industry and electric power industry, such as: storage, LNG contracts, operating dispatch, LNG plants pricing and operational flexibility. Despite the increase in LNG international trade and the prospect of using this product in Brazil, there are some challenges for the effective use of LNG plants by Brazilian electric sector. Some of the challenges are the need to review the methodology of calculating the cost benefit of LNG power plants. Another important challenge is to examine the use of underground storage and its influence in the operating dispatch of LNG plants. (author)

  20. Credit risk in the pool-implications for private capital investments in Brazilian power generation

    International Nuclear Information System (INIS)

    Rocha, Katia; Alcaraz Garcia, Francisco A.

    2006-01-01

    The new Brazilian Electric Sector Regulation of 2004 introduced two negotiation markets: the regulated pool and the free market. Competition in the pool is enforced via energy auctions, where the winning generator has to sign long-term power purchase agreements simultaneously with all distributors at the bidding-price. To estimate the appropriate credit risk spread of the pool, we implement a clustering methodology to rank and rate the distributors. The results show an average spread between 5.75% and 8.5%, which corresponds to a credit rating of B- according to the spreads available in Reuters 2004. This estimation is at least 208 basis points higher than the credit rating Ba1/BB+ assigned to the distributors by the National Electric Energy Agency (ANEEL) in the periodic tariff revisions. Distributors with higher risk/spread are located in the South-Southeast, compared to the low risk/spread ones concentrated in the North-Northeast. We estimate the opportunity cost of capital in real terms in the range of 13-16% to account for the credit risk of the pool. Essential to determine the bidding price at the auctions, this estimation is higher than the 11.26% opportunity cost estimated by ANEEL. The pool's credit risk has to be taken into consideration, especially for compensating new private capital investments in Brazilian power generation

  1. Opportunities to improve the private capital in Brazilian electricity supply industry

    International Nuclear Information System (INIS)

    Medeiros, R.A. de.

    1993-08-01

    The Brazilian electricity supply industry has passed substantial changes in the last fifty years. In the 50's was almost completely controlled by foreign companies. In the 70's, it turned to be almost exclusively ruled by Federal and State Enterprises. In the 80's the electricity supply sector started a financial and institutional crises. Some changes, already in course, indicate new changes of it for the next years. This study give emphasis to: the reasons that lead to a fast and well succeeded State intervention in the post-war; the multiple reasons of the recent crisis in sector, trying to insert it in the general context of the country; the alternative that have being formulated to overcome the obstacles created by the crisis; and the main factors for an efficient re-structure of the Brazilian electricity sector for the next years, included privatisation. (author)

  2. Imported mineral coal: competitiveness for electric power generation in northeast of Brazil

    International Nuclear Information System (INIS)

    Codeceira Neto, A.; Ribeiro Filho, A.P.R.; Silva, S.P.R. da

    1993-01-01

    With the hydroelectric potential exhaustion of northeast and with the increase of costs to the use of hydroelectric uses available in Brazil, the thermoelectric generation will be able to become a competitive solution to attend the market of electric power. This work has as purpose describe the options of imported coal use to Brazilian northeast its technological aspects, the environmental question, and the preliminary studies of localization and the costs associated on implantation of coal thermoelectric power plants. 7 refs, 3 figs, 6 tabs

  3. Participation of the Nuclear Power Plants in the New Brazilian Electric Energy Market

    International Nuclear Information System (INIS)

    Mathias, S.G.

    2004-01-01

    A new regulation framework has been established for the Brazilian electric energy market by a law put into effect on March 15,2004. The main overall goals of this new regulation are: to allow the lowest possible tariffs for end users, while providing the necessary economic incentives for the operation of present installations (generating plants, transmission lines, distribution networks) and the expansion of the system; long-term planning of the extension of the installations required to meet the demand growth; separation of the generation, transmission and distribution activities by allocating them into different companies; new contracts between generating and distribution companies must result from bidding processes based on lowest-tariff criteria; and energy from new generating units required to meet the demand growth must be contracted by all distributing companies integrated to the National Interconnected Grid, in individual amounts proportional to their respective markets

  4. The electric power engineering handbook electric power generation, transmission, and distribution

    CERN Document Server

    Grigsby, Leonard L

    2012-01-01

    Featuring contributions from worldwide leaders in the field, the carefully crafted Electric Power Generation, Transmission, and Distribution, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) provides convenient access to detailed information on a diverse array of power engineering topics. Updates to nearly every chapter keep this book at the forefront of developments in modern power systems, reflecting international standards, practices, and technologies. Topics covered include: * Electric Power Generation: Nonconventional Methods * Electric Power Generation

  5. The last mile in the Brazilian Amazon – A potential pathway for universal electricity access

    International Nuclear Information System (INIS)

    Gómez, Maria F.; Silveira, Semida

    2015-01-01

    The Brazilian rural electrification initiative Luz Para Todos – LPT (Light for All) has attracted attention internationally due to its ambitious targets and significant achievements in the last decade. The initiative has proved effective in its first phase, which has been developed through the extension of the grid. Yet, there are still important challenges to provide the service to inhabitants of remote areas in the Brazilian Amazon. We identify these challenges within institutional, technology, and funding structures operating within LPT. In line with these challenges, we propose a pathway to facilitate the achievement of universal electricity access in remote areas of the region. The proposed pathway is based on three key leverage points: (i) rules guiding the relationship among new agents and communities; (ii) the implementation of small-scale power generation technologies based on local resources; and (iii) optimized subsidies. It has the potential to allow (i) a better dimensioning of off-grid solutions considering local resources and realities, (ii) the creation of adapted institutions capable of implementing and operating the required systems and, (iii) an effective operation of off-grid solutions. -- Highlights: •There are important challenges to provide universal electricity access in the Amazon. •We propose a pathway to facilitate universal electricity access in remote areas of the Amazon. •The pathway allows a transition to a more knowledge-driven and participatory system

  6. Bidding strategies in Brazilian electricity auctions

    International Nuclear Information System (INIS)

    Azevedo, Erick M.; Correia, Paulo B.

    2006-01-01

    Double bilateral contract auctions for electric energy purchase and sale occur in Brazil. These auctions present incomplete information and possess some subjectivity in relation to the future scenario of the Brazilian electric system, inserted in the agent's bids. In this work, a model using Bayes' rule and the game theory is proposed to aid the agent in its bid definition. Through the existing relations between the Conditional probabilities of Bayes' Rule, the model transforms beliefs into information. In this way, the absence of information is supplied and the problem is transformed into a game with complete information. The present study has no worries in terms of transmission constraints, since they are not usually considered in the bilateral contract auctions in Brazil. At the end, Nash equilibrium (NE) can be found through the expected payoff matrix of each agent. (author)

  7. The stagnation of electric system expansion

    International Nuclear Information System (INIS)

    Santos, A.M. dos

    1989-01-01

    The main works in the Brazilian electric sector in 1988 is presented, mentioning the fault of financier resources. The electric power tariffs by a real economical cost are also cited, allowing some advantages that can resolve the investment problem in the electric power expansion. (author)

  8. Instruments for the regulation of the electric power projects: An integrated vision of the socio-environmental aspects

    International Nuclear Information System (INIS)

    Regini Nutti, Miriam; Milazzo, Maria Luiza; Rodriguez Garcia, Eduardo; Menezes, Carlos Frederico; Pompeu Serran, Flavia; Sebastiao Costa, Luiz; Neves Mundim, Rogerio

    1999-01-01

    The process of institutional change in the Brazilian electric sector accelerated the revision or elaboration of relating normative documents to the elaboration of studies and generation projects and electric power transmission. These documents were produced in a cooperative way by initiative of the organ federal regulator, under the coordination of ELETROBRAS and with the collaboration of technical teams of about ten Brazilian companies of energy. The aspects socio-environmental was absorbed in the normative documents, starting from an integrated vision of content and of the activities proposed with the energy studies and of engineering, allowing to diminish the relating uncertainties to the implementation of the projects and to assist to the national and sector environmental politics

  9. Brazilian energy statistics - 1988. Annual bulletin of the Brazilian National Committee of the World Energy Conference

    International Nuclear Information System (INIS)

    1988-01-01

    This bulletin deals with the primary sources that carry most weight in the Brazilian energy balance: hydraulic energy, petroleum, natural gas and coal. It contains data on ethyl alcohol derived from sugar cane and some information about the Brazilian Action Plan for the petroleum sector, nuclear energy, ecology and Chernobyl. Graphs, annual statistics and long range data of electric power, petroleum and derivates, natural gas, coal and alcohol are also included. 19 figs., 15 tabs

  10. The electric power engineering handbook electric power transformer engineering

    CERN Document Server

    Harlow, James H

    2012-01-01

    Electric Power Transformer Engineering, Third Edition expounds the latest information and developments to engineers who are familiar with basic principles and applications, perhaps including a hands-on working knowledge of power transformers. Targeting all from the merely curious to seasoned professionals and acknowledged experts, its content is structured to enable readers to easily access essential material in order to appreciate the many facets of an electric power transformer.Topically structured in three parts, the book: * Illustrates for electrical engineers the relevant theories and pri

  11. The Brazilian nuclear power manpower development programme

    International Nuclear Information System (INIS)

    Barbalho, A.R.; Spitalnik, J.; Machado, J.B.

    1983-01-01

    Since the early stages of decision making, manpower availability has been recognized to be a key factor for the implementation of Brazil's nuclear power programme. Though care has been given to securing an industrial base and financial resources, the consequences of a lack of sufficient qualified manpower could be critical for the success of the whole programme. The broad scope of the Brazilian nuclear power programme which, as a main concept, aimed at establishing in the country a complete fuel cycle industry together with the construction of nuclear power plants, added another burden to the already complex task of providing appropriate human resources when advanced technologies are introduced in a developing country. Thus, not only the work-force required for nuclear power plant operation but also that needed for plant design, component manufacture, fuel cycle plant design and operation, had to be made available in number and qualification in accordance with the standards of the nuclear industry. The feasibility of the Brazilian programme depended on a complete transfer of technology, essentially achieved through personnel training. Again, the process of manpower preparation for an efficient know-how transfer required careful planning, and the great difficulty in its implementation was the lack of reliable experience at the time. (author)

  12. Review of the Brazilian experience in the licensing of nuclear power plants

    International Nuclear Information System (INIS)

    Lederman, L.; Laborne, J.J.

    1983-01-01

    Survey of the licensing of the Brazilian Nuclear Power Plants (NPPs) is presented. The organization and technical expertise of the Comissao Nacional de Energia Nuclear, the Brazilian Regulatory Body, is reviewed with regard to in-house experience, foreign consultants, agreements with regulatory bodies of other countries and research contracts with Brazilian univerisities. The application of the two-stage licensing process and the stage of development of Brazilian nuclear standards is described. Finally, the paper speculates about the future role of probabilistic risk assessment in the Brazilian licensing process

  13. The Rio Grande do Norte electric power market: the competitiveness that won't come

    International Nuclear Information System (INIS)

    Silva, Neilton Fidelis da; Pernambuco Univ., Recife

    1999-01-01

    The central issue of debate was the need to align the energy sector's options and organization with changing global patterns of economic and social development, characterized by the increasing role played by the private sector, greater integration in the world economy, and new economic and social priorities such as efficiency, decentralization, deregulation, and a closer attention to environmental issues. The aim of the work was to analyze the Rio Grande Norte, a Brazilian state, electric power market after privatization advent based on regulations established by National Agency of Electric Energy

  14. Competitive strategies and models of business management in the Brazilian electric sector; Estrategias competitivas e modelos de gestao empresarial no setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Figueiredo, Breno Pinto

    1999-12-15

    This study draws attention to the fact that most of the discussions and studies related to the restructuring of electricity industry in Brazil, almost exclusively address the technological and institutional aspects involved in the question, when competitive strategies and management models to be followed by power companies are essential to ensure the consolidation of new design of the institutional industry in the daily operation of business. The proposition is that the evaluation of competitive strategies and management models can be a working tool for the State, in addition to offer to the electric power companies administrators an initial map or check list for planning and operation of its business, in the institutional model that is being implemented for the Brazilian electric sector.

  15. CAPM (Capital Asset Pricing Model) and regulation in Brazilian electric distribution sector

    International Nuclear Information System (INIS)

    Pinto, Rinaldo Caldeira; Parente, Virginia

    2010-01-01

    The aim of this paper is to analyse the use of Capital Asset Pricing Model (CAPM) Beta in the Brazilian electric distribution sector tariffs review. The betas applied by the Regulatory Agency are defined using data from the American, English and Brazilian markets. These betas will then be compared to the betas obtained in the domestic market. The betas were directly obtained from an economic-financial databank largely employed by the market. The sample is composed of companies' shares, priced at Sao Paulo Stock Market. Their main activity is the distribution of electric energy between July 2002 and July 2007. The results of mean betas obtained for the distribution segment, with values close to the ones applied by the regulatory agency for the cycle of tariff reviews between 2007-2010. (author)

  16. Commercial statistical bulletin of the Brazilian electric utility Centrais Eletricas de Santa Catarina S.A

    International Nuclear Information System (INIS)

    1996-04-01

    Statistical data concerning the Brazilian Centrais Eletricas de Santa Catarina S.A. utility relative to April 1996 are presented. They include, among other things, electricity consumption, number and class of consumers and electricity rates

  17. Electric power annual, 1991

    International Nuclear Information System (INIS)

    1993-01-01

    The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. The 1991 edition has been enhanced to include statistics on electric utility demand-side management and nonutility supply. ''The US Electric Power Industry at a Glance'' section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms

  18. The Ten-Year 2007-2016 Plan of Power Expansion in the context of the recovering of Brazilian electric sector planning: advances and possible enhancements; O Plano Decenal de Expansao de Energia 2007/2016 no contexto da retomada do planejamento do setor eletrico brasileiro: avancos e possiveis aprimoramentos

    Energy Technology Data Exchange (ETDEWEB)

    Buratini, Ricardo [Universidade Estadual de Campinas (IE/UNICAMP), SP (Brazil). Inst. de Economia

    2008-07-01

    The purpose of this paper is to analyze the methodology for power consumption projection presented in the Ten-year (2007-2016) Plan of Power Expansion (PDEE 2007/2016) and to propose some questions for discussion. Indeed, bearing in mind the progress achieved in the recent past with respect to the resumption of long term planning in the Brazilian electric power sector, it is pertinent to promote a discussion about the possible limitations of the expansion methodology proposed in PDEE. In short, it is believed that, starting from such a discussion, it could be possible to contribute towards the aim of making the planning process of the Brazilian electric power sector expansion more transparent, more consistent and more participative, consequently bringing a greater convergence of the expectations of the agents of the sector. The main questions raised in this paper about the PDEE's methodology are with respect to the absence of sufficient detail about the interactive adjustment of the several models used to project the consumption, as well as to the lack of information about the models themselves. The general conclusion of this paper is that, in order that the PDEE meets its objective of providing correct signals to all the agents, it is necessary to include more incisively the sector's specialists and the private agents in the methodological discussions, so that no important doubts will remain about the various projections. In our understanding, the success of such an enterprise will depend not only on the disposition of the agents, but on the greater detail and depth that should be previously given to the questions raised in this paper. It is certainly a significant challenge, of a high complexity but of an even higher importance to the electric power sector and to the Brazilian economy. (author)

  19. Electric power annual 1992

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-06

    The Electric Power Annual presents a summary of electric utility statistics at national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts and the general public with historical data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. ``The US Electric Power Industry at a Glance`` section presents a profile of the electric power industry ownership and performance, and a review of key statistics for the year. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; retail sales; revenue; financial statistics; environmental statistics; electric power transactions; demand-side management; and nonutility power producers. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences in US electricity power systems. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. Monetary values in this publication are expressed in nominal terms.

  20. Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices

    Science.gov (United States)

    Chassin, David P [Pasco, WA; Donnelly, Matthew K [Kennewick, WA; Dagle, Jeffery E [Richland, WA

    2011-12-06

    Electrical power distribution control methods, electrical energy demand monitoring methods, and power management devices are described. In one aspect, an electrical power distribution control method includes providing electrical energy from an electrical power distribution system, applying the electrical energy to a load, providing a plurality of different values for a threshold at a plurality of moments in time and corresponding to an electrical characteristic of the electrical energy, and adjusting an amount of the electrical energy applied to the load responsive to an electrical characteristic of the electrical energy triggering one of the values of the threshold at the respective moment in time.

  1. Economic analysis of Brazilian policies for energy efficient electric motors

    International Nuclear Information System (INIS)

    Andrade, Cássio Tersandro de Castro; Pontes, Ricardo Silva Thé

    2017-01-01

    Brazil is leading several energy efficiency initiatives and has ambitious goals for 2030, according to the Brazilian National Energy Plan 2030. One of the main initiatives is the minimum efficiency performance standards (MEPS) program for energy-driven equipment and the electric motors appear as the most significant one (49% share of the total electricity consumption). The MEPS levels set new grades for efficiency, and then manufacturers and consumers have to conform to the new products and costs. Policy makers have to economically assess the effects of these MEPS in order to maintain the market stability. Since the benefits of this program come from future energy savings, this cost-effective analysis has to consider the parameters uncertainty and the results should reinforce the market players’ confidence. Thus, the goal of this work is, first, to analyze the economic viability of the MEPS transitions in Brazil considering the uncertainty of the parameters involved and then, to estimate the effects of this program on the energy savings goals for 2030. At the end, we also verify whether this investment in energy efficiency is competitive with other forms of investments in energy. - Highlights: • A cost-effectiveness method with uncertainty for efficiency program is presented. • Savings from electric motors MEPS program makes the 2030 Brazilian goals possible. • Electric motors MEPS program cost-effectiveness in Brazil is confirmed. • Saved energy cost from efficiency improvement is a competitive energy investment.

  2. Electric power generation

    International Nuclear Information System (INIS)

    Pinske, J.D.

    1981-01-01

    Apart from discussing some principles of power industry the present text deals with the different ways of electric power generation. Both the conventional methods of energy conversion in heating and water power stations and the facilities for utilizing regenerative energy sources (sun, wind, ground heat, tidal power) are considered. The script represents the essentials of the lecture of the same name which is offered to the students of the special subject 'electric power engineering' at the Fachhochschule Hamburg. It does not require any special preliminary knowledge except for the general principles of electrical engineering. It is addressing students of electrical engineering who have passed their preliminary examination at technical colleges and universities. Moreover, it shall also be of use for engineers who want to obtain a quick survey of the structure and the operating characteristics of the extremely different technical methods of power generation. (orig.) [de

  3. Brazilian nuclear renaissance in a sustainable development scenario - 097

    International Nuclear Information System (INIS)

    Dias, M.S.; Mattos, J.R.L.

    2010-01-01

    Brazil generated 326 TWh of hydroelectric power in 2005, accounting for ∼81% of the electricity production for that year. The 2005 to 2030 projections for the Brazilian development indicate growths from 2,020 kWh to 4,380 kWh in the per capita electricity consumption and from US$4,300 to US$8,950 in the per capita GDP (in market exchange rate and 2005 US$). The consumption of electricity is to grow from 375 TWh in 2005 to 1,030 TWh in 2030. In simple view and without considerations of aspects related with energy efficiency, this growth means 1.8 times the generation capacity of the 20. century should be built along of 25 years of the 21. century. The Brazilian electricity generation will demand all primary sources to meet the foreseen growth of the electricity consumption. As economical, safe and clean primary energy source for electricity generation, the nuclear energy is one option capable of large-scale and short-term deployment in the Brazilian growth of the electricity consumption. The contribution of nuclear generation in the electricity consumption should evolve from the current 2.6% for amounts over 5% in 2030. The perspective of the Brazilian nuclear sector is evolving to be resumed and present an opportunity for pooling and rationalizing the available skills - technical, cultural and human. The role of business opportunities and the future demands in the value chain of nuclear activities are summarized in this document. Institutions of R and D and Brazilian universities play an important role for the formation of new demanded knowledge and human resources. (authors)

  4. Electric power system / emergency power supply

    International Nuclear Information System (INIS)

    Dorn, P.G.

    1980-01-01

    One factor of reliability of reactor safety systems is the integrity of the power supply. The purpose of this paper is a review and a discussion of the safety objectives required for the planning, licensing, manufacture and erection of electrical power systems and components. The safety aspects and the technical background of the systems for - the electric auxiliary power supply system and - the emergency power supply system are outlined. These requirements result specially from the safety standards which are the framework for the studies of safety analysis. The overall and specific requirements for the electrical power supply of the safety systems are demonstrated on a 1300 MW standard nuclear power station with a pressurized water reactor. (orig.)

  5. Cost evolution of electric energy in Brazil

    International Nuclear Information System (INIS)

    Oliveira, A. de; Contreras, E.C.A.

    1981-01-01

    An analysis of electric energy costs in Brazil is presented. Hydro, coal and nuclear costs are analysed and the final conclusion seems to indicate that nuclear power plants are not economically interesting untill the Brazilian electric capacity attains 110 GW average power. (Author) [pt

  6. CNEN activities and brazilian nuclear power policy

    International Nuclear Information System (INIS)

    Costa, E.M. da

    1989-01-01

    The goal of the brazilian policy in nuclear power is to provide its use in a pacific way to promote the well being of our people. It is intended, as well, to finish the construction of Angra II and III and proceed with the implementation of the nuclear fuel cycle, progressively fomenting its nationalization. (A.C.A.S.)

  7. Expansion planning of brazilian electric sector: institutional changes, new policies and new instruments for planning

    International Nuclear Information System (INIS)

    Bajay, S.V.; Silva, W.A. da; Ricciulli, D.L.S.

    1990-01-01

    The Brazilian power supply industry has been in crisis for many years, particularly due to financial and institutional problems. There are many reasons for that, several of them from outside the industry. In this paper a diagnosis of the main elements of this crisis is worked out, in the context of the industry's expansion planning. Following, institutional changes, new policies and new instruments are proposed for this planning. The institutional setting, the demand studies, the demand side management, the supply optimisation, the rural electrification, the decentralized generation of electricity, the tariff structure, the ways of financing the industry, the technological advances, the social and environmental impacts and the integrated planning of the industry are discussed, together with the planning of the power supply industry interactions with the other energy supply industries and the rest of the economy. (author)

  8. The Electrical Resistivity and Acoustic Emission Response Law and Damage Evolution of Limestone in Brazilian Split Test

    Directory of Open Access Journals (Sweden)

    Xinji Xu

    2016-01-01

    Full Text Available The Brazilian split test was performed on two groups of limestone samples with loading directions vertical and parallel to the bedding plane, and the response laws of the electrical resistivity and acoustic emission (AE in the two loading modes were obtained. The test results showed that the Brazilian split test with loading directions vertical and parallel to the bedding showed obviously different results and anisotropic characteristics. On the basis of the response laws of the electrical resistivity and AE, the damage variables based on the electrical resistivity and AE properties were modified, and the evolution laws of the damage variables in the Brazilian split test with different loading directions were obtained. It was found that the damage evolution laws varied with the loading direction. Specifically, in the time-varying curve of the damage variable with the loading direction vertical to the bedding, the damage variable based on electrical resistivity properties showed an obvious damage weakening stage while that based on AE properties showed an abrupt increase under low load.

  9. Shipboard electrical power systems

    CERN Document Server

    Patel, Mukund R

    2011-01-01

    Shipboard Electrical Power Systems addresses new developments in this growing field. Focused on the trend toward electrification to power commercial shipping, naval, and passenger vessels, this book helps new or experienced engineers master cutting-edge methods for power system design, control, protection, and economic use of power. Provides Basic Transferable Skills for Managing Electrical Power on Ships or on LandThis groundbreaking book is the first volume of its kind to illustrate optimization of all aspects of shipboard electrical power systems. Applying author Mukund Patel's rare combina

  10. Assessment and statistics of Brazilian hydroelectric power plants: Dam areas versus installed and firm power

    International Nuclear Information System (INIS)

    Caetano de Souza, Antonio Carlos

    2008-01-01

    The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by dams established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible. (author)

  11. A proposal of cost evaluation of own capital for the Brazilian electric sector; Uma proposta de avaliacao do custo do capital proprio para o setor de energia eletrica brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Serrano, Ricardo Oliveira L.

    2003-12-01

    This work studies the own capital cost of the Brazilian electric sector, by using three methodologies: Comparable Accounting Results (CAR), using historical values for measurement, Discounted Cash Flow (DCF) and the CAPM, elaborated from expected values.The obtained results by using the CAR method indicated that the Brazilian electric power sector is not receiving remuneration according to the real maintenance and expansion necessities. Based on this observation, it was considered appropriated to discard the CAR method in the proposed methodology, therefore using the simply average of the CAPM e DCF models. By using the simply average of the models presents the advantage of capturing specific characteristics of each model, and to dilute effects of eventual extreme values.

  12. The electric sector and its insert in a global scenery; O setor eletrico e sua insercao num cenario globalizado

    Energy Technology Data Exchange (ETDEWEB)

    Serrano, Ricardo Oliveira Lopes

    1999-11-01

    The document discusses the following issues of the Brazilian electric power sector: historical aspects; the creation of the ELETROBRAS and the sectorial debts process; financial and productive globalization; electric industry and the new environment and the new businesses. The author concludes the work detaching the new business appearance in the Brazilian electric power sector.

  13. Electric power industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Zisheng Jiang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents the status of the electric power in China, highlighting the following aspects: recent achievement, electricity increased sharing in the total energy consumption, technical economic indexes, nuclear power, renewable energy sources, rural electrification, transmission and power network, transmission lines and substations, present status and development trends for power network, regulation of power system dispatching, power system communication. The document also presents the future developing plan, approaching the outlook and strategy, development targets of the electric power industry and the administrative system reforming of the electric power industry.

  14. The Brazilian participation in the nuclear power plant construction

    International Nuclear Information System (INIS)

    Fabricio, R.A.C.

    1981-01-01

    A brief review about the origin of the brazilian nuclear power program and the strategy adopted for its implementation in Brazil is presented. The creation of the Nuclebras Engineering S/A, the Germany technology transfer and the personell job-training in Brasil are discussed. Some management models used for nuclear power plant construction in the world are still presented. (E.G.) [pt

  15. Consumers free of electric power. A practical vision; Consumidores livres de energia eletrica. Uma visao pratica

    Energy Technology Data Exchange (ETDEWEB)

    Florezi, Guilherme

    2009-07-01

    In the new environment of the Brazilian electric power sector, since the changes in the institutional model beginning in 1993, electrical sector agents entered into a highly competitive market, particularly in the case of the consumers which have had the possibility to choose their supplier of electricity in accordance with rules and restrictions that have been modified over the years. The consumer that fits this profile, was named free consumer whom in accordance with the rules and restrictions dictated by the National Electric Energy Agency (ANEEL), will have the option of electrical energy delivery through other companies, instead of the company that holds granting of the area where the consumer in question is physically located. The other costumers, that could not be qualified as free, remain captive, unable to choose for their supply from outside the area where the original grant is located. The studies presented here are an important starting point for research on free energy consumers and their behavior in order to provide subsidies to the readers to get a better understanding of the history of the Brazilian energy sector and the free market, with emphasis on free consumers, to thereby enable their potential bases for a possible study of migration to the free market . (author)

  16. The Brazilian experience of incentive of renewable sources expansion by means of electric power auctions; A experiencia brasileira de incentivo a expansao das fontes renovaveis por meio de leiloes de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Viana, Alexandre Guedes [Camara de Comercializacao de Energia Eletrica (CCEE), Sao Paulo, SP (Brazil); Parente, Virginia [Universidade de Sao Paulo (USP), SP (Brazil)

    2010-07-01

    The aim of this paper is to present the Brazilian experience to encourage renewable sources of power generation through the auctions into the Regulated Environment of Contracting. These auctions are subdivided into auctions of existing plants, new plants, alternative sources and structural plants. In this process we observe the structure of the mechanism for contracting new projects of renewable sources without neglecting the low tariffs issues. Thus, the auctions of electricity in Brazil is an alternative to be considered in an attempt to group market mechanisms, low tariffs and incentives to renewable sources of generation. (author)

  17. Electric vehicle system for charging and supplying electrical power

    Science.gov (United States)

    Su, Gui Jia

    2010-06-08

    A power system that provides power between an energy storage device, an external charging-source/load, an onboard electrical power generator, and a vehicle drive shaft. The power system has at least one energy storage device electrically connected across a dc bus, at least one filter capacitor leg having at least one filter capacitor electrically connected across the dc bus, at least one power inverter/converter electrically connected across the dc bus, and at least one multiphase motor/generator having stator windings electrically connected at one end to form a neutral point and electrically connected on the other end to one of the power inverter/converters. A charging-sourcing selection socket is electrically connected to the neutral points and the external charging-source/load. At least one electronics controller is electrically connected to the charging-sourcing selection socket and at least one power inverter/converter. The switch legs in each of the inverter/converters selected by the charging-source/load socket collectively function as a single switch leg. The motor/generators function as an inductor.

  18. Electric power annual, 1990

    International Nuclear Information System (INIS)

    1992-01-01

    The Electric Power Annual presents a summary of electric utility statistics at the national, regional and State levels. The objective of the publication is to provide industry decisionmakers, government policy-makers, analysts and the general public with historical data that may be used in understanding US electricity markets. ''The Industry at a Glance'' section presents a profile of the electric power industry ownership and performance; a review of key statistics for the year; and projections for various aspects of the electric power industry through 2010. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue, and average revenue per kilowatthour sold; financial statistics; environmental statistics; and electric power transactions. In addition, appendices provide supplemental data on major disturbances and unusual occurrences. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter

  19. Liberation of electric power and nuclear power generation

    International Nuclear Information System (INIS)

    Yajima, Masayuki

    2000-01-01

    In Japan, as the Rule on Electric Business was revised after an interval of 35 years in 1995, and a competitive bid on new electric source was adopted after 1996 fiscal year, investigation on further competition introduction to electric power market was begun by establishment of the Basic Group of the Electric Business Council in 1997. By a report proposed on January, 1999 by the Group, the Rule was revised again on March, 1999 to start a partial liberation or retail of the electric power from March, 2000. From a viewpoint of energy security and for solution of global environmental problem in Japan it has been decided to positively promote nuclear power in future. Therefore, it is necessary to investigate how the competition introduction affects to development of nuclear power generation and what is a market liberation model capable of harmonizing with the development on liberation of electric power market. Here was elucidated on effect of the introduction on previous and future nuclear power generation, after introducing new aspects of nuclear power problems and investigating characteristic points and investment risks specific to the nuclear power generation. And, by investigating some possibilities to development of nuclear power generation under liberation models of each market, an implication was shown on how to be future liberation on electric power market in Japan. (G.K.)

  20. Long expansion planning of electrical power availability in Brazil under the real options theoretical approach; Planejamento de longo prazo da expansao da oferta de energia eletrica no Brasil sob uma perspectiva da teoria das opcoes reais

    Energy Technology Data Exchange (ETDEWEB)

    Marreco, Juliana de Moraes

    2007-05-15

    This thesis considers uncertainty on the long term generation expansion planning in the Brazilian Electric System, under a Real Options Approach . First, Real Options Theory is used to demonstrate the importance of thermo power plants insertion in Brazil, through a flexibility valuation on hydrothermal system. This is the first objective of this thesis. In the second part a Real Options Model is proposed to support long term expansion studies, based in a levelized costs analysis. The adequacy of proposed models to real problem is illustrated by a case study of the Brazilian Power System. The results show the importance of the energetic matrix diversification on the Long Term Planning. In the expansion model proposed, results are in favor of higher participation of biomass, nuclear power and coal in Brazilian electricity generation matrix. (author)

  1. Driving with electrical power

    International Nuclear Information System (INIS)

    Ursin, M.; Hoeckel, M.

    2008-01-01

    This article takes a look at the chances offered to the electricity supply industry by the increasing use of battery-driven vehicles - and the advantages thus offered to the environment. The use of the vehicles' batteries to form a distributed electricity storage scheme is discussed. The authors comment that, although electrically-driven vehicles consume more power, the total primary energy consumption and pollutant emissions will be reduced. The actual electricity consumption of electric vehicles and the source of this power are examined. Power saved by the reduced use of electrical heating systems and boilers could, according to the authors, be used to charge the batteries of electric vehicles. The use of these batteries as a storage system to help regulate electricity supplies is discussed and the steps to be taken for the implementation of such a system are listed

  2. Electric power production contra electricity savings

    International Nuclear Information System (INIS)

    Schleisner, L.; Grohnheit, P.E.; Soerensen, H.

    1991-01-01

    The expansion of electricity-producing plants has, in Denmark until now, taken place in accordance with the demand for electricity. Recently, it has been suggested that the cost of the further development of such systems is greater than the cost of instigating and carrying out energy conservation efforts. The aim of the project was to evaluate the consequences for power producing plants of a reduction of the electricity consumption of end-users. A method for the analysis of the costs involved in the system and operation of power plants contra the costs that are involved in saving electricity is presented. In developing a model of this kind, consideration is given to the interplay of the individual saving project and the existing or future electricity supply. Thus it can be evaluated to what extent it would be advisable to substitute investments in the development of the capacity of the power plants with investments in the reduction of electricity consumption by the end users. This model is described in considerable detail. It will be tested in representative situations and locations throughout the Nordic countries. (AB) 17 refs

  3. Vehicle-to-Grid Power in Danish Electric Power Systems

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2009-01-01

    The integration of renewable energy systems is often constrained by the variable nature of their output. This demands for the services of storing the electricity generated from most of the renewable energy sources. Vehicle-to-grid (V2G) power could use the inherent energy storage of electric...... vehicles and its quick response time to balance and stabilize a power system with fluctuating power. This paper outlines the use of battery electric vehicles in supporting large-scale integration of renewable energy in the Danish electric power systems. The reserve power requirements for a high renewable...... energy penetration could be met by an amount of V2G based electric vehicles less than 10% of the total vehicle need in Denmark. The participation of electric vehicle in ancillary services would earn significant revenues to the vehicle owner. The power balancing services of electric vehicles...

  4. Electric power development in the USSR

    International Nuclear Information System (INIS)

    Rudenko, Y.N.

    1993-01-01

    The generation of electric power in the USSR is based on the Unified Electric Power System (UEPS) whose network cover most of the habitable territory of the country. Therefore, the development of the UEPS governs the overall evolution of the electric power generation in the country. At present, eleven out of thirteen joint electric power systems, which supply electricity to most of the USSR, are operating within the UEPS. The total electric power generation in the country reached 1728 billion kWh in 1990, of which the UEPS supplied approximately 90%. About 70% of installed capacity of the UEPS is fossil-fuelled power plants, about 12 % is nuclear power plants, and about 18% is hydroelectric power plants. The system-forming grid of the UEPS is made up of transmission lines of 220, 330, 500 and 750 kV. The on-line supervisory control of the UEPS is achieved by four-level automated system of dispatch control (UEPS, joint electric power systems, regional electric power systems, electric power plants, substations,electric grid regions). The development and extension of the UEPS in the USSR ensure higher reliability and quality of electric power supply to end-users, combined with higher efficiency. The principal problem facing the UEPS are as follows: the need to ensure environmental protection and efficiency of the steam power plants; to improve the safety and efficiency of nuclear power plants. The solution to these problems will define the conditions of the UEPS development, as well as electric power systems of other countries, at least for the coming two decades. This paper characterizes the peculiarities of the UEPS development over the last 20 years, including the installed capacity structure and the system-forming electric power grid. Special attention is paid to the environmental problems related to functioning and development of the UEPS and to the means of their solution. (author)

  5. R&D and Innovation Management in the Brazilian Electricity Sector: the Regulatory Constraint

    Directory of Open Access Journals (Sweden)

    Denile Cominato Boer

    2014-04-01

    Full Text Available In 2000 it became mandatory to the Brazilian electricity companies to invest in research, development and innovation (RDI. These investments are performed by firms and regulated by the Brazilian Electricity Regulatory Agency (ANEEL. Since then companies have sought ways to cope with this obligation creating internal structures and managerial processes. This article presents the evolution of RDI management routines and organizational models based on a multiple-case study conducted between 2011 and 2012 with seven companies that represent about 27% of the total RDI investment performed in the period of 2008 to 2013. The research showed that firms created minimalist management and organizational structures to handle with the RDI enforcement. Companies have been much more concerned with the regulatory risk (the risk of non-accomplishment with the obligations than to any strategic use of RDI effort since the legal framework is based on punishment rather than in stimulus.

  6. Swiss electrical power association

    International Nuclear Information System (INIS)

    1983-01-01

    Milestones of electrical power development in Switzerland during 1982 are quoted. An energy balance is shown for the utilisation of 864,630 terajoules of primary energy. This is related to global data on per capita power consumption. In the electricity generation section, annual load factors are given for the four nuclear stations. A brief review is made of hydro potential and monthly export/import figures for power to other countries (mostly export, especially in summer). Total electrical power output grew about 1.3% in the last year. Recent transmission line developments are noted, mostly 2x380kV, and including a link with Austria. In the financial section, consumer price indices are quoted for liquid and solid fuel, gas and electricity since 1966. Under administration, details are listed of the main and about 18 supporting Committees and working groups with special functions (e.g. tariffs, electrical vehicles). Public relations have included nuclear power press conferences, a mobile video unit, information leaflets for the media and a teaching seminar. (G.C.)

  7. Electric power in Canada 1992

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Electric power in Canada is given a comprehensive review by the Electricity Branch of the Department of Natural Resources Canada. The Electric Power Industry is scrutinized for electricity consumption, generation, trade and pricing across all of Canada. 98 tabs. 26 figs.

  8. Electric power in Canada 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Electric power in Canada is given a comprehensive review by the Electricity Branch of the Department of Natural Resources Canada. The Electric Power Industry is scrutinized for electricity consumption, generation, trade and pricing across all of Canada. 98 tabs. 26 figs

  9. Ethnic Identity and Power: Quilombos in Brazilian Public Policy

    Directory of Open Access Journals (Sweden)

    Felipe Peres Calheiros

    2010-06-01

    Extension Assistance (Pnater, this article examines the relation of power between public policies and ethnic identities. It discusses how the reformulated concept of development influences government activity in rural contexts and the adoption of compensatory actions for excluded portions of the population. It briefly presents the social, legal and conceptual trajectory of the quilombos, localizing the dynamics of power in the construction of quilombola identity, a project in constant re-elaboration by Brazilian society.

  10. 30 CFR 77.500 - Electric power circuits and electric equipment; deenergization.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric power circuits and electric equipment... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.500 Electric power circuits and electric equipment; deenergization. Power circuits and electric equipment shall be deenergized before work is done on...

  11. Electric power substations engineering

    CERN Document Server

    McDonald, John D

    2012-01-01

    The use of electric power substations in generation, transmission, and distribution remains one of the most challenging and exciting areas of electric power engineering. Recent technological developments have had a tremendous impact on all aspects of substation design and operation. With 80% of its chapters completely revised and two brand-new chapters on energy storage and Smart Grids, Electric Power Substations Engineering, Third Edition provides an extensive updated overview of substations, serving as a reference and guide for both industry and academia. Contributors have written each chapt

  12. Nuclear energy in the increasingly deregulated brazilian energy market

    International Nuclear Information System (INIS)

    Mathias, Sergio G

    2003-01-01

    The Brazilian Electric Energy Market is presently undergoing an institutional transition from a strictly regulated to a commercially competitive market, due to be completed by January, 2006. The operation and maintenance costs of the two presently existing Brazilian nuclear power plants allow them to be economically competitive with other types of plants for meeting the load demand in the country. The commercialization of the energy produced by the two existing nuclear power plants must cope with the impact of the new market rules, which establish that power purchase contracts must be freely negotiated between generating and distributing companies. The projected costs for the construction and operation of a third NPP also indicate that it may be economically feasible under the new market rules (author)

  13. Financing the electric power utilities, especially the nuclear power in Japan

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-04-01

    Electric power demands in Japan have shown a remarkable growth at an annual rate of 12% since 1965. Nine electric power companies have invested large amounts of money so far, amounting to over 1 trillion yen every year since 1972. A survey of the electric power supply system and an estimation of the electric power demands in 1980 and in 1985 are given. It is expected that the main portion of electric power in the future will gradually be generated by nuclear plants. Financial features of the electrical power utilities, the credit risk of the electric power utilities, and the raising of funds by electric power utilities are discussed. It is concluded that it will be necessary (1) to expand the capital market, (2) to enable the electric power companies to issue a sufficient amount of bonds, (3) to make the Government financing institutions, such as the Japan Development Bank, provide the electric power companies with larger funds on a long-term and low-interest rate basis, and (4) even to take such drastic steps as subsidizing interest on private loans to the electric power companies. (B.P.)

  14. Economical and strategical aspects of Brazilian-Germany nuclear agreement

    International Nuclear Information System (INIS)

    Carvalho, J.F. de.

    1981-01-01

    The strategical and economical aspects of Brazilian-Germany nuclear agreement are analyzed in three aspects: 1) The nuclear agreement in the context of the Brazilian economic - and social development process, considering the availability of energetic resouces of the country. Political implications. Considerations about creation and transfer of technology. 2) The economy aspects involved in the agreement. Comparison costs of electrical energy generated in a nuclear power plants and hydroelectric plant in Brazil. Impacts on the industrial development. 3) Strategical aspects. (E.G.) [pt

  15. Electric power annual 1997. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Electric Power Annual 1997, Volume 2 contains annual summary statistics at national, regional, and state levels for the electric power industry, including information on both electric utilities and nonutility power producers. Included are data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold; financial statistics; environmental statistics; power transactions; and demand-side management. Also included are data for US nonutility power producers on installed capacity; gross generation; emissions; and supply and disposition of energy. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with historical data that may be used in understanding US electricity markets. 15 figs., 62 tabs.

  16. The discussion about the privatization of the brazilian electric sector

    International Nuclear Information System (INIS)

    Rio, G.A.P. do; Pinto Junior, H.Q.

    1990-01-01

    This paper examines the complexities of the privatisation of the brazilian power sector. We try to explain the differences between privatisation.It is shown, based on a formulation proposes by Aylen, that the solutions of the sector problems has to do with the management reform of the public utilities and also the holding ELETROBRAS. (author)

  17. The structural changes in the brazilian electric sector and the utilities strategic management; A restruturacao do setor eletrico brasileiro e o gerenciamento estrategico das empresas

    Energy Technology Data Exchange (ETDEWEB)

    Lotero, Roberto C.; Santana, Edvaldo Alves de [Santa Catarina Univ., Florianopolis, SC (Brazil). Programa de Pos-graduacao em Engenharia de Producao e Sistemas

    1998-12-31

    The objective of this paper is to show structural and market changes in brazilian electric sector and their implications on new business environment. Factors that will affect power utilities are pointed out and how they should be thoughtful in new model. Is pointed out the strategic change as a mean for utility optimization in efficiency and comparative advantage search. (author) 11 refs.; e-mail: rcl at eps.ufsc.br

  18. Brazilian energy statistics - 1989. Annual bulletin of the Brazilian National Committee of the World Energy Conference

    International Nuclear Information System (INIS)

    1989-01-01

    This bulletin deals with the primary sources that carry most weight in the Brazilian energy balance: hydraulic energy, petroleum, natural gas and coal. It contains data on ethyl alcohol derived from sugar cane and some aspects about nuclear energy in Brazil. Graphs, annual statistics and historical data of electric power, petroleum and petroleum products, natural gas, coal and alcohol are also included. 17 figs., 12 tabs

  19. Electric power annual 1995. Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This document summarizes pertinent statistics on various aspects of the U.S. electric power industry for the year and includes a graphic presentation. Data is included on electric utility retail sales and revenues, financial statistics, environmental statistics of electric utilities, demand-side management, electric power transactions, and non-utility power producers.

  20. Forces that direct the competition in the electric power industry in the new institutional scenery

    International Nuclear Information System (INIS)

    Ribeiro Filho, Ary Pinto; Moraes, Walter Fernando Araujo de

    1999-01-01

    This work identifies the probable strategic characteristics of the interconnected North-Northeast Brazilian electricity industry, after the current restructuring and privatization process has been implemented. It is a 15.0 thousand MW generation industry supplying more than 33.5 million consumers. The normative scenery for analysis of the electricity industry takes into consideration the premises that the government establishes the vertical separation of generation, transmission, distribution and retailing, and introduces the regulation to a competitive industrial structure in generation and retailing. It is assumed that free access to transmit and distribute electricity and broad choices for consumers are the main features for competition in both generation and retailing. The essence of formulating strategy is to relate a company with its environment, considering the industrial structure. Porter's five forces model for industry environment and competition, emphasizing the role of the government in such regulated industry, is the basic theoretical reference. The main strategic characteristics related to entry barriers, rivalry intensity, supplier power, customer power and substitute products are analyzed. (author)

  1. Power Requirements Determined for High-Power-Density Electric Motors for Electric Aircraft Propulsion

    Science.gov (United States)

    Johnson, Dexter; Brown, Gerald V.

    2005-01-01

    Future advanced aircraft fueled by hydrogen are being developed to use electric drive systems instead of gas turbine engines for propulsion. Current conventional electric motor power densities cannot match those of today s gas turbine aircraft engines. However, if significant technological advances could be made in high-power-density motor development, the benefits of an electric propulsion system, such as the reduction of harmful emissions, could be realized.

  2. Report of the 2. Seminar on economic and financial planning of the electric sector; Relatorio do 2. Seminario de planejamento economico financeiro do setor eletrico

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This book collects working presented at the second seminar of financial and economic planning for the Brazilian electric power system. The main issues discussed are the new economic order and the consequences in the Brazilian electric power system in what concerns pricing, planning and energetic sources

  3. Electric power annual 1995. Volume I

    International Nuclear Information System (INIS)

    1996-07-01

    The Electric Power Annual presents a summary of electric power industry statistics at national, regional, and State levels. The objective of the publication is to provide industry decisionmakers, government policymakers, analysts, and the general public with data that may be used in understanding U.S. electricity markets. The Electric Power Annual is prepared by the Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); U.S. Department of Energy. In the private sector, the majority of the users of the Electric Power Annual are researchers and analysts and, ultimately, individuals with policy- and decisionmaking responsibilities in electric utility companies. Financial and investment institutions, economic development organizations interested in new power plant construction, special interest groups, lobbyists, electric power associations, and the news media will find data in the Electric Power Annual useful. In the public sector, users include analysts, researchers, statisticians, and other professionals with regulatory, policy, and program responsibilities for Federal, State, and local governments. The Congress and other legislative bodies may also be interested in general trends related to electricity at State and national levels. Much of the data in these reports can be used in analytic studies to evaluate new legislation. Public service commissions and other special government groups share an interest in State-level statistics. These groups can also compare the statistics for their States with those of other jurisdictions

  4. Restructured electric power systems analysis of electricity markets with equilibrium models

    CERN Document Server

    2010-01-01

    Electricity market deregulation is driving the power energy production from a monopolistic structure into a competitive market environment. The development of electricity markets has necessitated the need to analyze market behavior and power. Restructured Electric Power Systems reviews the latest developments in electricity market equilibrium models and discusses the application of such models in the practical analysis and assessment of electricity markets.

  5. Electric power: Past, present, and future

    International Nuclear Information System (INIS)

    Schnetzer, H.

    1994-01-01

    When, at the turn of the century, public electric power supply facilities were created and in 1908, the electric power stations of the Swiss canton of Zurich (EKZ) were built, only a third of the communities in the Zurich area could boast about being the consumers of this new energy. But what did the first electrically powered devices and machines look like? This, and more, is presented in the ''electric power house'' in Burenwisen Glattfelden in the canton of Zurich. Besides a Kaplan turbine and a sample of the most interesting devices from the past and the present, the focus of the exhibition is on the presentation of the new and old sources of light. The EKZ are pleased to be able to present their ''electric power house'' to the public, providing a broad range of information on energy-related questions and the development of electric power supply. (orig.) [de

  6. Electric power statistics from independence to establishment

    International Nuclear Information System (INIS)

    1997-02-01

    This paper reports power statistics from independence to establishment pf KEPIC. It has the lists of electricity industry, electric equipment on the whole country power equipment at the independence and development of power facility, power generation about merit of power plants, demand according to types and use, power loss, charge for electric power distribution, power generation and generating cost, financial lists on income measurement and financing, meteorological phenomena and amount of rainfall electric power development, international statistics on major countries power generation and compare power rates with general price.

  7. Electric power annual 1997. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Electric Power Annual presents a summary of electric power industry statistics at national, regional, and State levels. The objective of the publication is to provide industry decisionmakers, government policy-makers, analysts, and the general public with data that may be used in understanding US electricity markets. The Electric Power Annual is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels; Energy Information Administration (EIA); US Department of Energy. Volume 1 -- with a focus on US electric utilities -- contains final 1997 data on net generation and fossil fuel consumption, stocks, receipts, and cost; preliminary 1997 data on generating unit capability, and retail sales of electricity, associated revenue, and the average revenue per kilowatthour of electricity sold (based on a monthly sample: Form EIA-826, ``Monthly Electric Utility Sales and Revenue Report with State Distributions``). Additionally, information on net generation from renewable energy sources and on the associated generating capability is included in Volume 1 of the EPA.

  8. Electric Power Monthly, March 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and state level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data are presented on generation, fuel consumption, stockpiles, costs, sales, and unusual occurrences. Fuels considered are: coal, petroleum, natural gas, nuclear power, and hydroelectric power. 4 figs., 48 tabs

  9. Economy of scale for nuclear power plants operating in hydroelectric systems - Brazilian case study

    International Nuclear Information System (INIS)

    Andrade, Gilberto

    1996-01-01

    Economy of scale is considered to enhance competitiveness of nuclear energy for electricity generation but only when high capacity factors are considered. This study shows that for the brazilian electricity generation system low capacity factors are expected and economy of scale has to be considered against the size of the Nuclear program. Units of 600 MW are competitive both for small and large Programs. (author)

  10. Electric power distribution handbook

    CERN Document Server

    Short, Thomas Allen

    2014-01-01

    Of the ""big three"" components of electrical infrastructure, distribution typically gets the least attention. In fact, a thorough, up-to-date treatment of the subject hasn't been published in years, yet deregulation and technical changes have increased the need for better information. Filling this void, the Electric Power Distribution Handbook delivers comprehensive, cutting-edge coverage of the electrical aspects of power distribution systems. The first few chapters of this pragmatic guidebook focus on equipment-oriented information and applications such as choosing transformer connections,

  11. Electric Power annual 1996: Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document presents a summary of electric power industry statistics. Data are included on electric utility retail sales of electricity, revenues, environmental information, power transactions, emissions, and demand-side management.

  12. 30 CFR 75.509 - Electric power circuit and electric equipment; deenergization.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric power circuit and electric equipment... LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.509 Electric power circuit and electric equipment; deenergization. [Statutory Provisions] All...

  13. Supply of appropriate nuclear technology for the developing world: small power reactors for electricity generation

    International Nuclear Information System (INIS)

    Heising-Goodman, C.D.

    1981-01-01

    This paper reviews the supply of small nuclear power plants (200 to 500 MWe electrical generating capacity) available on today's market, including the pre-fabricated designs of the United Kingdom's Rolls Royce Ltd and the French Alsthom-Atlantique Company. Also, the Russian VVER-440 conventionally built light-water reactor design is reviewed, including information on the Soviet Union's plans for expansion of its reactor-building capacity. A section of the paper also explores the characteristics of LDC electricity grids, reviewing methods available for incorporating larger plants into smaller grids as the Israelis are planning. Future trends in reactor supply and effects on proliferation rates are also discussed, reviewing the potential of the Indian 220 MWe pressurised heavy-water reactor, South Korean and Jananese potential for reactor exports in the Far East, and the Argentine-Brazilian nuclear programme in Latin America. This study suggests that small reactor designs for electrical power production and other applications, such as seawater desalination, can be made economical relative to diesel technology if traditional scaling laws can be altered by adopting and standardising a pre-fabricated nuclear power plant design. Also, economy can be gained if sufficient attention is concentrated on the design, construction and operating experience of suitably sized conventionally built reactor systems. (author)

  14. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg. Previously announced in STAR as N83-24764

  15. Advanced electrical power system technology for the all electric aircraft

    Science.gov (United States)

    Finke, R. C.; Sundberg, G. R.

    1983-01-01

    The application of advanced electric power system technology to an all electric airplane results in an estimated reduction of the total takeoff gross weight of over 23,000 pounds for a large airplane. This will result in a 5 to 10 percent reduction in direct operating costs (DOC). Critical to this savings is the basic electrical power system component technology. These advanced electrical power components will provide a solid foundation for the materials, devices, circuits, and subsystems needed to satisfy the unique requirements of advanced all electric aircraft power systems. The program for the development of advanced electrical power component technology is described. The program is divided into five generic areas: semiconductor devices (transistors, thyristors, and diodes); conductors (materials and transmission lines); dielectrics; magnetic devices; and load management devices. Examples of progress in each of the five areas are discussed. Bipolar power transistors up to 1000 V at 100 A with a gain of 10 and a 0.5 microsec rise and fall time are presented. A class of semiconductor devices with a possibility of switching up to 100 kV is described. Solid state power controllers for load management at 120 to 1000 V and power levels to 25 kW were developed along with a 25 kW, 20 kHz transformer weighing only 3.2 kg.

  16. The influence of Goiania radiological accident on Brazilian public opinion concerning new nuclear electric plants; A influencia do acidente radiologico de Goiania na aceitacao publica de novas usinas nucleoeletricas

    Energy Technology Data Exchange (ETDEWEB)

    Meldonian, Nelson Leon; Mattos, Luis Antonio Terribile de [Instituto de Pesquisas Energeticas e Nucleares (IPEN), Sao Paulo, SP (Brazil). Grupo de Energia e Ambiente

    1997-12-31

    The Brazilian society is against applications of nuclear energy, mainly respecting to construction of new nuclear power plants, believing that they are harmful to population`s welfare and the environment. By this reason, Brazilian nuclear sector would promote a more intensive program of public discussion, not limited to technical and scientific community. Intending to contribute to a better judgment by society about the differences between diverse employment of nuclear energy, arguments concerned to its benefits are presented, pointing out that adverse accounts to nuclear electricity based on Goiania radiological accident, are not justified 10 refs., 5 tabs.; e-mail: meldonia at net.ipen.br

  17. Water electrolysis for hydrogen production in Brazilian perspective

    Energy Technology Data Exchange (ETDEWEB)

    Saliba-Silva, Adonis Marcelo; Carvalho, Fatima M.S.; Bergamaschi, Vanderlei Sergio; Linardi, Marcelo [Instituto de Pesquisas Energeticas e Nucleares (CCCH/IPEN/CNEN-SP), Sao Paulo, SP (Brazil). Fuel Cell and Hydrogen Center], Email: saliba@ipen.br

    2009-07-01

    Hydrogen is a promising energy carrier, which potentially could replace the fossil fuels used in the transportation and distributed energy sector of Brazilian economy. Fossil fuels are polluting by carbogenic emissions from their combustion, being so co-responsible for present global warming. However, no large scale, cost-effective, environmentally non-carbogenic hydrogen production process is currently available for commercialization. There are feasible possibilities to use electrolysis as one of the main sources of hydrogen, especially thinking on combination with renewable sources of energy, mainly eolic and solar. In this work some perspectives for Brazilian energy context is presented, where electrolysis combined with renewable power source and fuel cell power generation would be a good basis to improve the distributed energy supply for remote areas, where the electricity grid is not present or is deficient. (author)

  18. Comparative studies between nuclear power plants and hydroelectric power plants

    International Nuclear Information System (INIS)

    Menegassi, J.

    1984-01-01

    This paper shows the quantitative evolution of the power plants in the main countries of the world. The Brazilian situation is analysed, with emphasys in the technical and economical aspects related to power production by hidroelectric or nuclear power plants. The conclusion is that the electricity produced by hidro power plants becomes not economics when is intended to be produced at large distances from the demand centers. (Author) [pt

  19. Highlights of Electric Power Industry in China

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    @@Reform and Development of Electric Power Management Before 1978, China's electric power industry,managed by the Central Government, was a vertically monopoly sector. Along with China's reformation of economy structure started in 1978, electric power industry has step on its road of restructuring and deregulation. Up to now administration of China's electric power industry underwent following reciprocative changes:

  20. Electric power: the liberalization effects

    International Nuclear Information System (INIS)

    Carpentier, J.

    1999-01-01

    Nine months after the beginning of the deregulation of electric power markets in Europe, the first effects are being felt: fall of prices, amalgamation of electric power companies, development of new technologies and unemployment. (O.M.)

  1. A centennial book of Korea electric power corporation

    International Nuclear Information System (INIS)

    1989-12-01

    This book gives description of KEPC with power and life such as lighting, electric power, electric heat and communication, introduction of electric civilization, establishment and manage of Hansung electric company on opening of electric train, regulation of the train, opening of lamp business, construction of Yongsan generator, the Japanese invasion with trouble of supplying electricity, control over power business and development of water power generation, division of Korea and Korea war on damage out of Korea war and rebuild, development and growth on establishment of Korea electric power, establishment of Korea electric power by private and water power development project, stability and development, and challenge for future.

  2. Dynamics of risk management tools and auctions in the second phase of the Brazilian Electricity Market reform

    International Nuclear Information System (INIS)

    De Souza, Fabio Cavaliere; Legey, Luiz Fernando Loureiro

    2010-01-01

    In 2004, the reform of the Brazilian Electricity Market underwent a thorough revision. One of its causes was the electricity rationing that began in June 2001 and lasted until February 2002. Among other measures, the 2004 revision devised new mechanisms intended to reduce risks associated to contracts settled in electricity auctions and those related to investments in new generation plants. As 4 years have passed since the onset of the reform's revision, sufficiently enough data are now available for an analysis of the post-revision dynamics of the Brazilian Electricity Market. This is the purpose of the present paper. We focus on the dynamics of the different types of electricity auctions and on the so-called Mechanism for Compensation of Surpluses and Deficits, both created in the wake of the 2004 revision. The ultimate goal is to understand the behavior of the agents involved in auctions - notably buyers and sellers of electricity - and propose remedial actions to eliminate existing loopholes in the present regulatory framework. To achieve this goal, four steps were necessary. Firstly, a data base to support the analysis was built. Then, the main drivers of the dynamics of the risk management tools were identified. Finally, consequences of the implemented changes were discussed and corrections for observed pitfalls proposed. (author)

  3. Impact Study on Power Factor of Electrical Load in Power Distribution System

    International Nuclear Information System (INIS)

    Syirrazie Che Soh; Harzawardi Hasim; Ahmad Asraf, A.S.

    2014-01-01

    Low Power Factor of electrical loads cause high current is drawn from power supply. The impact of this circumstance is influenced by impedance of electrical load. Therefore, the key consideration of this study is how impedance of electrical loads influence power factor of electrical loads, and then power distribution as the whole. This study is important to evaluate the right action to mitigate low power factor effectively for electrical energy efficiency purpose. (author)

  4. 33 CFR 127.107 - Electrical power systems.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Electrical power systems. 127.107... Waterfront Facilities Handling Liquefied Natural Gas § 127.107 Electrical power systems. (a) The electrical power system must have a power source and a separate emergency power source, so that failure of one...

  5. Electric Vehicles in Power Systems with 50% Wind Power Penetration

    DEFF Research Database (Denmark)

    Østergaard, Jacob; Foosnæs, Anders; Xu, Zhao

    2009-01-01

    will be an important balancing measure to enable the Danish government’s energy strategy, which implies 50% wind power penetration in the electric power system. An EV will be a storage device for smoothing power fluctuations from renewable resources especially wind power and provide valuable system services...... for a reliable power system operation. Cost-benefit analysis shows that intelligent bidirectional charging – vehicle to grid (V2G) – provides a socio-economic profit of 150 million Euro/year in the Danish electric power system in 2025 assuming that 15% of the Danish road transport need is supplied by electricity....... This paper analyse the potential for using EVs in Denmark and identify the benefits of the electric power system with high wind power generation by intelligent charging of the EVs. Based on the analysis important technology gabs are identified, and the corresponding research and development initiatives...

  6. Electric Power Regulation in Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Landa, J V [Universidad Nacional Autonoma de Mexico, Mexico City (Mexico)

    1994-12-31

    The history of the electrical power sector in Mexico, the prominent role that government plays in the generation, transformation, distribution and supply of electrical power, and the implications of the North American Free Trade Agreement (NAFTA) for this sector were summarized. The slow pace of the Mexican electricity sector in achieving cost efficiency through pricing policy was criticized, and the issue of regulation versus deregulation of the electricity sector was examined in the context of NAFTA, emphasizing the contradiction between the idea of international trade and a highly regulated industry. Revisions of the original constitutional article to exclude electrical power generation from governmental control and to allow market mechanisms and competition to lower costs and increase efficiency was recommended.It was considered a pre-condition to a stable balance between competition and energy efficient environmentally friendly practices.

  7. Soft Power, Hard Aspirations: the Shifting Role of Power in Brazilian Foreign Policy

    Directory of Open Access Journals (Sweden)

    Marcelo M. Valença

    2014-12-01

    Full Text Available Journalists and policy analysts have highlighted the emergence of Brazil as a regional power. However, little attention has been paid to its foreign policy strategies. Brazil's rise to prominence in world politics represents the historical culmination of a foreign policy featuring two main strategies – persuasion and consensus building – both of which emphasise the use of soft power. We analyse four current foreign policy initiatives: the campaign for a permanent seat on the UNSC; the development of a nuclear submarine; Brazil's leadership of the UN peacekeeping mission in Haiti; and government support for Brazilian multinationals. We suggest a growing tension between these initiatives and the two strategies identified above. These initiatives reflect the view current among some policymakers that if Brazil is to rise as a global power it must play by the rules of great power politics.

  8. Electric Power Transmission Lines

    Data.gov (United States)

    Department of Homeland Security — Transmission Lines are the system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power...

  9. Probabilistic risk benchmark of the Brazilian electrical system; Risco probabilistico de referencia do sistema eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Soares, Neyl Hamilton Martelotta

    2002-05-01

    The main goal of this dissertation is to proceed a first numerical evaluation of the probabilistic risks magnitudes associated with the Brazilian Electrical network, considering the subsystems North, Northeast, South, Southeast and Mid West. This result is relevant because it can be used as an initial comparative reference for future reliability studies of the Brazilian Basic Grid. As a by-product, the whole set of criteria and procedures used in the work are described in detail. They may also serve as a preliminary base for future similar evaluations. (author)

  10. Performance indicators proposal for the government electric power distribution facilities in the Brazilian electric sector; Proposta de indicadores de desempenho as distribuidoras de energia federalizadas do setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Carregaro, Jose Carlos

    2003-07-01

    In this dissertation a set of indicators is proposed to the Centrais Eletricas Brasileiras S/A - ELETROBRAS, allowing the holding companies to attain the top position in the market, and a global vision of their performance. The methodology applied the definition of the performance indicators and the context, existing studies, and the indicators used by the Brazilian electric sector. It is expected that the proposed set of indicators be used by ELETROBRAS for a better planning and a more objective control of the holding companies performance, as well as an analysis of their administration strong and weak aspects.

  11. Development on power distribution technologies of four electric power companies in Japan. The Kansai Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Since dependency upon electric power has been rising yearly with the development of industry and the progress of information-oriented society, various kinds of technical development are needed to supply electricity. Furthermore, amenity of people's living has been highly intended, and life style has varied. Consequently, customers' needs for energy including related services have varied remarkably, and each customer has selected energy more subjectively from the wide range of viewpoint such as reliability, handiness, cleanliness, safety, and economic efficiency. In such situation, the power distribution section of Kansai Electric Power settled four themes for major technical development and has been promoting them. Four themes are as follows; to develop a total automation system for power distribution, to promote 20kV/400V-class power distribution, to develop techniques to form facilities harmonizing with local amenity, and to make business management efficient with the advanced NC system. 3 figs., 4 tabs.

  12. Heat-electricity convertion systems for a Brazilian space micro nuclear reactor

    Energy Technology Data Exchange (ETDEWEB)

    Guimaraes, Lamartine N.F.; Marcelino, Natalia B.; Placco, Guilherme M.; Nascimento, Jamil A.; Borges, Eduardo M., E-mail: guimarae@ieav.cta.br, E-mail: lamartine.guimaraes@pq.cnpq.br, E-mail: jamil@ieav.cta.br, E-mail: jalnsgf@outlook.com, E-mail: borges.em@hotmail.com, E-mail: ecorborges@hotmail.com, E-mail: ivayolini@gmail.com, E-mail: guilherme_placco@ig.com.br [Instituto de Estudos Avancados (IEAv/DCTA), Sao Jose dos Campos, SP (Brazil); Barrios Junior, Ary Garcia, E-mail: arygarcia89@yahoo.com [Faculdade de Tecnologia Sao Francisco (FATESF), Jacarei, SP (Brazil)

    2013-07-01

    This contribution will discuss the evolution work in the development of thermal cycles to allow the development of heat-electricity conversion for the Brazilian space micro nuclear Reactor. Namely, innovative core and nuclear fuel elements, Brayton cycle, Stirling engine, heat pipes, passive multi-fluid turbine, among others. This work is basically to set up the experimental labs that will allow the specification and design of the space equipment. Also, some discussion of the cost so far, and possible other applications will be presented. (author)

  13. Heat-electricity convertion systems for a Brazilian space micro nuclear reactor

    International Nuclear Information System (INIS)

    Guimaraes, Lamartine N.F.; Marcelino, Natalia B.; Placco, Guilherme M.; Nascimento, Jamil A.; Borges, Eduardo M.; Barrios Junior, Ary Garcia

    2013-01-01

    This contribution will discuss the evolution work in the development of thermal cycles to allow the development of heat-electricity conversion for the Brazilian space micro nuclear Reactor. Namely, innovative core and nuclear fuel elements, Brayton cycle, Stirling engine, heat pipes, passive multi-fluid turbine, among others. This work is basically to set up the experimental labs that will allow the specification and design of the space equipment. Also, some discussion of the cost so far, and possible other applications will be presented. (author)

  14. Electric power systems

    CERN Document Server

    Weedy, B M; Jenkins, N; Ekanayake, J B; Strbac, G

    2012-01-01

    The definitive textbook for Power Systems students, providing a grounding in essential power system theory while also focusing on practical power engineering applications. Electric Power Systems has been an essential book in power systems engineering for over thirty years. Bringing the content firmly up-to-date whilst still retaining the flavour of Weedy's extremely popular original, this Fifth Edition has been revised by experts Nick Jenkins, Janaka Ekanayake and Goran Strbac. This wide-ranging text still covers all of the fundamental power systems subjects but is now e

  15. General conditions for electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    If it is uncertain whether future power bills will be paid fully, it is admissible to take an action claiming a declaration which states that the electricity rate payment boycotter has no right to non-payment nor a right to withhold payment towards the electricity supply utility, and that the electricity supply utility has the right to stop energy supply because of reduced electricity rate payments effected and/or announced, and to denounce the contract without observing any term of notice. If the electricity buyer reduces a power bill to be paid without any legal grounds, the electricity supply utility has the right to stop power supplies and to denounce the power supply contract without observing any term of notice. The freedom of thought and the freedom of opinion must not be expressed by reducing power bills to be paid. Basic rights discontinue to be effective as soon as a contract or law is broken. A weighing of protected interests is not effected if the exercise of a basic law is unlawful. (orig./HP) [de

  16. ANALYSIS OF GROSS REGIONAL PRODUCT FLUCTUATIONS AND ELECTRIC POWER CONSUMPTION IN 2005- 2014. RESERVES FOR DECREASING ELECTRIC POWER PRICES

    Directory of Open Access Journals (Sweden)

    Suslov N. I.

    2016-09-01

    Full Text Available In this work we considered the trajectories of change in indicators characterizing the status of economics and power industry: gross regional product, electric power consumption, industrial production, energy prices and costs of delivering electric power to consumers in Russian regions for the last 10 years. Low global commodity prices and sanctions led to a sharp decrease of equipment import, which resulted in an acute problem of import substitution. The level of tariffs of natural monopolies is of great importance for industrial development. The goal of this work was to analyze possibilities for reducing electric power prices by changing the institutional and economic conditions of management. We analyzed not only the official information from Rosstat, but also government regulations, figures given in the official government publication «The Rossiyskaya Gazeta» as well as articles and interviews on economic problems of the electric power industry over the recent years published in «The Kommersant» newspaper. High tariffs of network marketing companies for electric energy transmission, state regulation of heating prices, financing the construction of new capacities by charging the payment in power provision contracts, high price of electric power of nuclear power plants lead to an annual increase in electric power prices for end users. In this work we considered possible solutions to limit the growth of electric power prices.

  17. The electrical system of nuclear power plant

    International Nuclear Information System (INIS)

    Firman Silitonga; Gunarwan Prayitno

    2009-01-01

    In these system, electrical power system is supplied from two-offsite transmission system respective main transformer and house service transformer; and reserve transformer. The electrical load in these system consist of safety electrical system and non-safety electrical system, The safety electrical and non safety electrical systems consist of four 6,9 kV AC medium voltage bus and 480 V AC low voltage bus system. The DC power system consist of four safety 125 V DC power system and the two non-safety 125 DC power systems. The equipment in these electrical system is main turbine-generator; GTG safety; GTG alternate; uninterrupted power supply (UPS) and battery system. To protect electrical equipment and building to direct stroke and non direct stroke disturbances is installed netral grounding system and lightning protection and protection the personnel to touch-voltage is installed equipment grounding system and station grounding. The lightning arrester system is connected to station station grounding system. (author)

  18. Electric power distribution. Elektrische Energieverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, H; Frohne, H; Vaske, P

    1982-01-01

    The first chapter on electric power supply networks discusses transmitting media, their characteristic values, and the dimensioning of electric lines and networks; cables are given particular attention. High-voltage d.c. transmission and reactive power compensation are discussed. The next chapter describes the calculation of short-circuits and earth leakages for various neutral circuits on the basis of symmetric components. The newly introduced mesh current method for complex calculation of electric networks makes use of the potential of pocket computers. Chapter 3 discusses protective devices, i.e. earth systems and electronic protection. The next two chapters describe switch gear and power plants, including recent technical changes. The final chapter, which discusses the electric power industry, has been rewritten and extended. Methods of calculation, e.g. annual cost and cash value, are applied to transmitting media and plants. There is an extensive appendix with characteristic values of cables and overhead lines, graphical symbols, distinguishing signs of wiring diagrams, a bibliography of books, DIN standards, VDE specifications, and formulas.

  19. Power Electronics and Electric Machines Publications | Transportation

    Science.gov (United States)

    Research | NREL and Electric Machines Publications Power Electronics and Electric Machines Publications NREL and its partners have produced many papers and presentations related to power electronics and from power electronics and electric machines research are available to the public. Photo by Pat Corkery

  20. Resources transfer and centralization in Brazilian electrical sector: the reversion global reserve (RGR) and the guarantee global reserve (GGR); Centralizacao e transferencia de recursos no setor eletrico brasileiro: a reserva global de reversao (RGR) e a reserva global de garantia (RGG)

    Energy Technology Data Exchange (ETDEWEB)

    Souza Amaral Filho, J.B. de

    1991-12-31

    This dissertation makes the analysis of resources transfer and centralization in Brazilian electrical sector, through reversion global reserve (RGR) and guarantee global reserve (GGR). RGR and GGR are funds. RGR finances sectorial investments in electric power and GGR aims the supply of deficient concessionaires. Governmental investments and the results of this application are showing. (M.V.M.). 55 refs, 2 figs, 61 tabs.

  1. Resources transfer and centralization in Brazilian electrical sector: the reversion global reserve (RGR) and the guarantee global reserve (GGR); Centralizacao e transferencia de recursos no setor eletrico brasileiro: a reserva global de reversao (RGR) e a reserva global de garantia (RGG)

    Energy Technology Data Exchange (ETDEWEB)

    Souza Amaral Filho, J.B. de

    1992-12-31

    This dissertation makes the analysis of resources transfer and centralization in Brazilian electrical sector, through reversion global reserve (RGR) and guarantee global reserve (GGR). RGR and GGR are funds. RGR finances sectorial investments in electric power and GGR aims the supply of deficient concessionaires. Governmental investments and the results of this application are showing. (M.V.M.). 55 refs, 2 figs, 61 tabs.

  2. Electrical power systems for Mars

    Science.gov (United States)

    Giudici, Robert J.

    1986-01-01

    Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

  3. Brazilian nuclear power plants decommissioning plan for a multiple reactor site

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys B.; Moreira, Joao M.L.; Maiorino, Jose R., E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas. Programa de Pos-Graduacao em Energia e Engenharia da Energia

    2015-07-01

    Actually, Brazil has two operating Nuclear Power Plants and a third one under construction, all at Central Nuclear Almirante Alvaro Alberto - CNAAA. To comply with regulatory aspects the power plants operator, Eletronuclear, must present to Brazilian Nuclear Regulatory Agency, CNEN, a decommissioning plan. Brazilian experience with decommissioning is limited because none of any nuclear reactor at the country was decommissioned. In literature, decommissioning process is well described despite few nuclear power reactors have been decommissioned around the world. Some different approach is desirable for multiple reactors sites, case of CNAAA site. During the decommissioning, a great amount of wastes will be produced and have to be properly managed. Particularly, the construction of Auxiliary Services on the site could be a good choice due to the possibility of reducing costs. The present work intends to present to the Eletronuclear some aspects of the decommissioning concept and decommissioning management, storage and disposal de wastes, based on the available literature, regulatory standards of CNEN and international experience as well as to suggest some solutions to be implemented at CNAAA site before starts the decommissioning project in order to maximize the benefits. (author)

  4. Brazilian nuclear power plants decommissioning plan for a multiple reactor site

    International Nuclear Information System (INIS)

    Monteiro, Deiglys B.; Moreira, Joao M.L.; Maiorino, Jose R.

    2015-01-01

    Actually, Brazil has two operating Nuclear Power Plants and a third one under construction, all at Central Nuclear Almirante Alvaro Alberto - CNAAA. To comply with regulatory aspects the power plants operator, Eletronuclear, must present to Brazilian Nuclear Regulatory Agency, CNEN, a decommissioning plan. Brazilian experience with decommissioning is limited because none of any nuclear reactor at the country was decommissioned. In literature, decommissioning process is well described despite few nuclear power reactors have been decommissioned around the world. Some different approach is desirable for multiple reactors sites, case of CNAAA site. During the decommissioning, a great amount of wastes will be produced and have to be properly managed. Particularly, the construction of Auxiliary Services on the site could be a good choice due to the possibility of reducing costs. The present work intends to present to the Eletronuclear some aspects of the decommissioning concept and decommissioning management, storage and disposal de wastes, based on the available literature, regulatory standards of CNEN and international experience as well as to suggest some solutions to be implemented at CNAAA site before starts the decommissioning project in order to maximize the benefits. (author)

  5. Power improvement and modernization of small scale hydroelectric power plants in Brazil; Recapacitacao e modernizacao de PCH`s no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Nascimento, Jose Guilherme Antioga do [Departamento Nacional de Aguas e Energia Eletrica (DNAEE), Brasilia, DF (Brazil); Amaral, Cristiano Abijaode [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1995-12-31

    Several small scale hydroelectric power plants existing in Brazil have been abandoned due to recent projects of large scale units, however, some of than still present workable conditions. Due to that fact, several Brazilian electric power companies have been considering the possibility of modernizing such old units as an alternative for regional electric power generation. This work discusses the above mentioned issues 3 refs., 5 figs., 9 tabs.

  6. Methods for Estimation of Market Power in Electric Power Industry

    Science.gov (United States)

    Turcik, M.; Oleinikova, I.; Junghans, G.; Kolcun, M.

    2012-01-01

    The article is related to a topical issue of the newly-arisen market power phenomenon in the electric power industry. The authors point out to the importance of effective instruments and methods for credible estimation of the market power on liberalized electricity market as well as the forms and consequences of market power abuse. The fundamental principles and methods of the market power estimation are given along with the most common relevant indicators. Furthermore, in the work a proposal for determination of the relevant market place taking into account the specific features of power system and a theoretical example of estimating the residual supply index (RSI) in the electricity market are given.

  7. Electric power system basics for the nonelectrical professional

    CERN Document Server

    Blume, Steven W

    2016-01-01

    The second edition of Steven W. Blume’s bestseller provides a comprehensive treatment of power technology for the non-electrical engineer working in the electric power industry. This book aims to give non-electrical professionals a fundamental understanding of large interconnected electrical power systems, better known as the “Power Grid”, with regard to terminology, electrical concepts, design considerations, construction practices, industry standards, control room operations for both normal and emergency conditions, maintenance, consumption, telecommunications and safety. The text begins with an overview of the terminology and basic electrical concepts commonly used in the industry then it examines the generation, transmission and distribution of power. Other topics discussed include energy management, conservation of electrical energy, consumption characteristics and regulatory aspects to help readers understand modern electric power systems.

  8. Development on power distribution technologies of four electric power companies in Japan. The Tokyo Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Electric power companies have been needed to cope with various needs in accordance with the progress of highly information-oriented society, the improvement of industrial technology, and the advancement and diversification of the living environment. In such situation, the power distribution section of Tokyo Electric Power has promoted technical development, setting up following priority items to put into operation: to reduce power failure caused by works and accidents, to improve reliability in supply, to reduce costs of construction and all over business management, to serve customers to answer various needs, to develop new technology and new methods based on the medium- and long-term prospect, and so forth. Several examples of recent technical development are introduced here. They are as follows; compact equipment and materials for electric poles to match the circumstances of cities and to simplify the construction method for power distribution, a 750kVA large high-voltage power-generation truck to make provision against an emergency such as a disaster by a typhoon, a compact transformer used on the ground, a high-voltage automatic cabinet, and a detector to find the failure of indoor power distribution works in resistances in a short time. 8 figs.

  9. French electric power balance sheet 2010

    International Nuclear Information System (INIS)

    Lartigau, Thierry; Riere, Alexia

    2011-01-01

    The mission of RTE, the French electricity Transportation grid, a public service assignment, is to balance the electricity supply and demand in real time. This report presents RTE's technical results for the year 2010: increase of RTE's investments and safety expenses for adapting the grid to the new electricity industry stakes and to meteorological hazards, decrease of power cuts frequency, rise of the French power consumption, strong increase of winter consumption peaks, increase of the French power generation, increase of the positive trade balance. New RTE's infrastructures, electricity quality data, and the evolution of market mechanisms are presented in appendixes

  10. Electric power system applications of optimization

    CERN Document Server

    Momoh, James A

    2008-01-01

    Introduction Structure of a Generic Electric Power System  Power System Models  Power System Control Power System Security Assessment  Power System Optimization as a Function of Time  Review of Optimization Techniques Applicable to Power Systems Electric Power System Models  Complex Power Concepts Three-Phase Systems Per Unit Representation  Synchronous Machine Modeling Reactive Capability Limits Prime Movers and Governing Systems  Automatic Gain Control Transmission Subsystems  Y-Bus Incorporating the Transformer Effect  Load Models  Available Transfer Capability  Illustrative Examples  Power

  11. The electric power sector in Iceland

    International Nuclear Information System (INIS)

    Ingimarsson, J.

    1992-01-01

    In Iceland the government must give permission for the building of a power station etc. but in practise the power plant administrators determine the tariffs. The structure of electric power supply mirrors a strong engagement on the part of the state and the local authorities. Almost all the power plants and distribution systems are state owned or owned by both the state and the local authorities, and so constitute a monopoly, producing 93% of the total amount of electricity supply. Government policy in this field, the Icelandic electric power distribution system and the setting of electricity prices are briefly described. It is claimed that there would be economical advantages in restructuring the distribution network and that the government favours an increase in possibilities for competition and making legislative changes. This will mean that in the future the market will play a more important role and that power plant administrators must review their duties regarding consumer satisfaction, tariffs etc. (AB)

  12. Basic strategies in the electric power industry in the new competitive environment

    International Nuclear Information System (INIS)

    Ribeiro Filho, Ary Pinto; Moraes, Walter Fernando Araujo de

    1999-01-01

    This work identifies the probable strategic characteristics of the interconnected North-Northeast Brazilian electricity industry, after the current restructuring and privatization process has been implemented. It is a 15.0 thousand MW generation industry supplying more than 33.5 million consumers. The normative scenery for analysis of the electricity industry takes into consideration the premises that the government establishes the vertical separation of generation, transmission, distribution and retailing, and introduces the regulation to a competitive industrial structure in generation and retailing. It is assumed that free access to transmit and distribute electricity and broad choices for consumers are the main features for competition in both generation and retailing. The essence of formulating strategy is to relate a company with its environment, considering the industrial structure. The probable generic strategies and industrial trends are presented, and considerations are made concerned with the future expansion capacity. Finally, in the new industrial structure which will settle after the deregulation and privatization, the main strategic issues of the companies will likely focus on: profitability, cost control, managerial competence, consumer behavior, and new technologies, in special the ones related to modern thermal power plants. (author)

  13. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Sandra R.; Johnson, Melvin; McClevey, Kenneth; Calopedis, Stephen; Bolden, Deborah

    1992-05-01

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

  14. Potentiality Prediction of Electric Power Replacement Based on Power Market Development Strategy

    Science.gov (United States)

    Miao, Bo; Yang, Shuo; Liu, Qiang; Lin, Jingyi; Zhao, Le; Liu, Chang; Li, Bin

    2017-05-01

    The application of electric power replacement plays an important role in promoting the development of energy conservation and emission reduction in our country. To exploit the potentiality of regional electric power replacement, the regional GDP (gross domestic product) and energy consumption are taken as potentiality evaluation indicators. The principal component factors are extracted with PCA (principal component analysis), and the integral potentiality analysis is made to the potentiality of electric power replacement in the national various regions; a region is taken as a research object, and the potentiality of electric power replacement is defined and quantified. The analytical model for the potentiality of multi-scenario electric power replacement is developed, and prediction is made to the energy consumption with the grey prediction model. The relevant theoretical research is utilized to realize prediction analysis on the potentiality amount of multi-scenario electric power replacement.

  15. Solar energy thermally powered electrical generating system

    Science.gov (United States)

    Owens, William R. (Inventor)

    1989-01-01

    A thermally powered electrical generating system for use in a space vehicle is disclosed. The rate of storage in a thermal energy storage medium is controlled by varying the rate of generation and dissipation of electrical energy in a thermally powered electrical generating system which is powered from heat stored in the thermal energy storage medium without exceeding a maximum quantity of heat. A control system (10) varies the rate at which electrical energy is generated by the electrical generating system and the rate at which electrical energy is consumed by a variable parasitic electrical load to cause storage of an amount of thermal energy in the thermal energy storage system at the end of a period of insolation which is sufficient to satisfy the scheduled demand for electrical power to be generated during the next period of eclipse. The control system is based upon Kalman filter theory.

  16. Fourteenth electric power survey of India

    International Nuclear Information System (INIS)

    1991-03-01

    Fourteenth Electric Power Supply Committee was set up by the Government of India in February 1989 to review the demand projections for electric power, in detail, keeping in view the Eight Plan proposals and to project the perspective demand for (electric) power upto the year 2009-10. Partial End-use method was adopted for forecasting the power demands over a short term period. For estimating the power requirements on a long-term basis, the trend in overall requirements in a state system formed the basis of projections. The long term forecast covering the period 1995-96 to 2009-10 was made by extrapolating the overall requirement of electricity for various states and Union Territories with 1994-95 as the base year. The data were collected from various State Electricity Boards, Public utilities, concerned departments of State Governments and various Ministries and Departments of the Government of India and were computerised. The data base was used to develop a number of scenarios and to make projections. (M.G.B.)

  17. Electric power balance sheet 2012

    International Nuclear Information System (INIS)

    2013-01-01

    The mission of RTE, the French electricity Transportation grid, a public service assignment, is to balance the electricity supply and demand in real time. This report presents RTE's technical results for the year 2012: strong seasonal contrast of power consumption, rise of the renewable energies contribution in meeting the electricity demand, slight decay of the nuclear and thermal power generation, decrease of the export balance and change in trades structure, adaptation of RTE's network to the evolutions of the energy system

  18. Forecast of electric power market to short-term: a time series approcah

    International Nuclear Information System (INIS)

    Costa, Roberio Neves Pelinca da.

    1994-01-01

    Three different time series approaches are analysed by this dissertation in the Brazilian electricity markert context. The aim is to compare the predictive performance of these approaches from a simulated exercise using the main series of the Brazilian consumption of electricity: Total Consumption, Industrial Consumption, Residencial Consumption and Commercial Consumption. One concludes that these appraches offer an enormous potentiality to the short-term planning system of the Electric Sector. Among the univariate models, the results for the analysed period point out that the forecast produced by Holt-Winter's models are more accurate than those produced by ARIMA and structural models. When explanatory variables are introduced in the last models, one can notice, in general, an improvement in the predictive performance of the models, although there is no sufficient evidence to consider that they are superior to Holt-Winter's models. The models with explanatory variables can be particularly useful, however, when one intends either to build scenarios or to study the effects of some variables on the consumption of electricity. (author). 73 refs., 19 figs., 13 tabs

  19. The Green Stamp in Power Supply Contracts - A proposal for the Brazilian Electricity Market

    Energy Technology Data Exchange (ETDEWEB)

    Estrocio, Joao Paulo

    2010-09-15

    The insertion of a certification mechanism for discriminatory energy supply contracts aiming to make it possible to contract exclusively clean and renewable energy is presented. With the increasing interest for sustainability and carbon emissions reduction, there's a growing demand for clean energy reflected in people's choices for cleaner products. Electricity in a power grid, however, is result of a set of sources or plants, and its operation or dispatch. A proposal for clean energy contracts is presented, providing the market and the clients with the ability to choose to buy exclusively renewable energy through the grid.

  20. Electric power engineering in the Taiwan Chinese Republic

    International Nuclear Information System (INIS)

    Kozlov, V.B.

    1992-01-01

    The data charaterizing the status and prospects of development of electric power engineering in the Taiwan Chenese Republic are given. The Tainwan electric power consumptions are covered by operation of 56 large electric power plants (nuclear, thermal, hydroelectric ones). The marginal majority (58.1%) of the registered power is generated at thermal power plants. Electric power generation in 1991 amounted to 89639 million kWxh. At that 33878 million kWxh or about 37.9% were produced at NPPs

  1. CHOOSING THE POWER OF TRACTION ELECTRIC MOTORS FOR ELECTRIC VEHICLES

    OpenAIRE

    O. Smirnov; A. Borisenko

    2017-01-01

    Recommendations on choosing the power of the electric motor, depending on the weight of the vehicle, its speed and the run distance in the «only electricity» mode are developed. Based on mathematical modeling and a number of field tests of electric vehicles, a three-dimensional dependance of the power on the weight and the speed set is built and conclusions are presented.

  2. CHOOSING THE POWER OF TRACTION ELECTRIC MOTORS FOR ELECTRIC VEHICLES

    Directory of Open Access Journals (Sweden)

    O. Smirnov

    2017-06-01

    Full Text Available Recommendations on choosing the power of the electric motor, depending on the weight of the vehicle, its speed and the run distance in the «only electricity» mode are developed. Based on mathematical modeling and a number of field tests of electric vehicles, a three-dimensional dependance of the power on the weight and the speed set is built and conclusions are presented.

  3. Reference costs of the electric power production

    International Nuclear Information System (INIS)

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  4. Electric Power Monthly, June 1988

    International Nuclear Information System (INIS)

    1988-06-01

    The data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The Energy Information Administration (EIA) collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The Electric Power Monthly contains information from three data sources: the Form EIA-759, 'Monthly Power Plant Report'; the Federal Energy Regulatory Commission (FERC) Form 423, 'Monthly Report of Cost and Quality of Fuels for Electric Plants ; and the Form EIA-826, M onthly Electric Sales and Revenue Report with State Distributions'. The Form EIA-759 collects data from all operators of electric utility generating plants (except those having plants solely on standby), approximately 800 of the more than 3,200 electric utilities in the United States. To reduce the reporting burden for utilities, the FERC Form 423 and Form EIA-826 data are based on samples, which cover less than 100 percent of all central station generating utilities. The FERC Form 423 collects data from steam-electric power generating plants with a combined installed nameplate capacity of 50 megawatts or larger (approximately 230 electric utilities). The 50-megawatt threshold was established by FERC. The Form EIA-826 collects sales and revenue data in the residential, commercial, industrial, and other sectors of the economy. Other sales data collected include public street and highway lighting, other sales to public authorities, sales to railroads and railways, and interdepartmental sales. Respondents to the Form EIA-826 were statistically chosen and include approximately 225 privately and publicly owned electric utilities from a universe of more than 3,200 utilities. The sample selection for the Form EIA-826 is evaluated annually. Currently, the Form EIA-826 data account for approximately 83 percent

  5. Hybrid electric vehicle power management system

    Science.gov (United States)

    Bissontz, Jay E.

    2015-08-25

    Level voltage levels/states of charge are maintained among a plurality of high voltage DC electrical storage devices/traction battery packs that are arrayed in series to support operation of a hybrid electric vehicle drive train. Each high voltage DC electrical storage device supports a high voltage power bus, to which at least one controllable load is connected, and at least a first lower voltage level electrical distribution system. The rate of power transfer from the high voltage DC electrical storage devices to the at least first lower voltage electrical distribution system is controlled by DC-DC converters.

  6. Fundamentals of electric power engineering engineering from electromagnetics to power systems

    CERN Document Server

    Ceraolo, Massimo

    2014-01-01

    At the basis of many sectors of engineering, electrical engineering deals with electricity phenomena involved in the transfer of energy and power. Professionals requiring a refresher course in this interdisciplinary branch need look no further than Fundamentals of Electric Power Engineering, which imparts tools and trade tricks to remembering basic concepts and grasping new developments. Even established engineers must supplement their careers with an invigorated knowledge base, and this comprehensive resource helps non-electrical engineers amass power system information quickly.

  7. An Optimum Solution for Electric Power Theft

    Directory of Open Access Journals (Sweden)

    Aamir Hussain Memon

    2013-07-01

    Full Text Available Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already

  8. An Optimum Solution for Electric-Power Theft

    International Nuclear Information System (INIS)

    Memon, A.H.; Memon, F.

    2013-01-01

    Electric power theft is a problem that continues to plague power sector across the whole country. Every year, the electricity companies face the line losses at an average 20-30% and according to power ministry estimation WAPDA companies lose more than Rs. 125 billion. Significantly, it is enough to destroy the entire power sector of country. According to sources 20% losses means the masses would have to pay extra 20% in terms of electricity tariffs. In other words, the innocent consumers pay the bills of those who steal electricity. For all that, no any permanent solution for this major issue has ever been proposed. We propose an applicable and optimum solution for this impassable problem. In our research, we propose an Electric power theft solution based on three stages; Transmission stage, Distribution stage, and User stage. Without synchronization among all, the complete solution can not be achieved. The proposed solution is simulated on NI (National Instruments) Circuit Design Suite Multisim v.10.0. Our research work is an implicit and a workable approach towards the Electric power theft, as for conditions in Pakistan, which is bearing the brunt of power crises already. (author)

  9. Advance in technologies of electric power in 2008

    International Nuclear Information System (INIS)

    Hamada, Kenichi; Maekawa, Fumiaki; Nakamura, Akio

    2008-01-01

    Ten electric power companies and two related companies reported their advance in technologies. The technologies of nuclear power plants were stated by ten companies, which consisted of introduction of new main control board to Tomari-3 in Hokkaido Electric Power Co., Inc., reduction methods of exposure dose of Higashidori-1 in Tohoku Electric Power, hot water based two-phase flow testing device for pipe thinning test by Tokyo Electric Power Company, Guideline for prevention of piping damage caused by combustion of mixture gases in BWR (the second edition) published by Thermal and Nuclear Power Engineering Society, setting up distributor in the low-pressure turbine of Shika-2 in Hokuriku Electric Power Company, development of rapid estimation method of release radioactivity and application of high density neutron source to nuclear transmutation of nuclear fuel cycle and introduction of new core monitor system by The Kansai Electric Power Co., Inc., upgrade of investigation of the effects of hot waste water and development of detector for dropout parts of cooling system in reactor by Shikoku Electric Power Co., Inc., change of transformer in Sendai-1 by Kyushu Electric Power Co., Inc., and reactor core design for Oma ABWR by J-Power. The Japan Atomic Power Company reported four articles such as development of technologies for established nuclear power plants, promotion of Tsuruga-3 and Tsuruga-4, application of clearance system in Japan and development of future reactors. (S.Y.)

  10. Power exchange game in the electricity market

    International Nuclear Information System (INIS)

    Pyykko, S.; Partanen, J.; Viljainen, S.; Lassila, J.; Honkapuro, S.; Tahvanainen, K.

    2006-01-01

    Since it is not economically reasonable to build parallel electricity networks, in Finland, Sweden, Norway and Denmark, electricity distribution is protected by monopoly. However, electricity production and selling have been opened up to competition by connecting the transmission networks of these countries together, and it is possible to produce electricity where it is cheapest. A common electricity power market, called Nord Pool, has been created where electricity can be bought, sold or used as an exchange product. In order to help students understand the operation of electricity markets and the use of different electricity exchange products, the Department of Electrical Engineering at Lappeenranta University developed a scheme in which the theory can be used in practice. In the scheme, students are given the responsibility to manage the electricity markets of power companies in order analyze, plan and make decisions, which are skills required on the open power markets. The paper provided an introduction to the electricity markets in Nordic countries and discussed Nord Pool and its products. Information about education at the Department of Electrical Engineering at Lappeenranta University of Technology was also presented. The paper also provided details of the power exchange scheme on the electricity markets. 6 refs., 17 figs

  11. Energy, electricity and nuclear power

    International Nuclear Information System (INIS)

    Reuss, P.; Naudet, G.

    2008-01-01

    After an introduction recalling what energy is, the first part of this book presents the present day energy production and consumption and details more particularly the electricity 'vector' which is an almost perfect form of energy despite the fact that it is not a primary energy source: it must be generated from another energy source and no large scale storage of this energy is possible. The second part of the book is devoted to nuclear energy principles and to the related technologies. Content: 1 - What does energy mean?: the occurrence of the energy concept, the classical notion of energy, energy notion in modern physics, energy transformations, energy conservation, irreversibility of energy transformations, data and units used in the energy domain; 2 - energy production and consumption: energy systems, energy counting, reserves and potentialities of energy resources, production of primary energies, transport and storage of primary energies, energy consumption, energy saving, energy markets and prices, energy indicators; 3 - electric power: specificity of electricity and the electric system, power networks, power generation, electricity storage, power consumption and demand, power generation economics, electricity prices and market; 4 - physical principles of nuclear energy: nuclei structure and binding energy, radioactivity and nuclear reactions, nuclear reactions used in energy generation, basics of fission reactors physics; 5 - nuclear techniques: historical overview, main reactor types used today, perspectives; 6 - fuel cycle: general considerations, uranium mining, conversion, enrichment, fuel fabrication, back-end of the cycle, plutonium recycle in water cooled reactors; 7 - health and environmental aspects of nuclear energy: effects on ionizing radiations, basics of radiation protection, environmental impacts of nuclear energy, the nuclear wastes problem, specific risks; 8 - conclusion; 9 - appendixes (units, physics constants etc..)

  12. Energy commercialization in the new environment of the Brazilian electric power sector. A methodology for production allocation strategies analysis; Comercializacao de energia no novo ambiente do setor eletrico brasileiro. Uma metodologia para analise de estrategias de alocacao da producao

    Energy Technology Data Exchange (ETDEWEB)

    Ramos, Dorel Soares [Companhia Energetica de Sao Paulo (CESP), SP (Brazil)]. E-mail: dorelam@cesp.com.br; Lima, Wagner da Silva [Sao Paulo Univ., SP (Brazil). Escola Politecnica]. E-mail: wagner@pea.usp.br; Castro, Roberto [ELEKTRO - Eletricidade e Servicos S.A., Sao Paulo, SP (Brazil)]. E-mail: castro@mt2net.com.br

    1999-07-01

    The restructuring of the Brazilian Electric Sector has modified the rules for purchase and sale of energy, resulting in the creation of the Wholesale Energy Market. In this new context, the decision of the exposure level to the spot market price and the purchase of energy through bilateral contracts becomes so much a strategic variable for consumers or dealers, as for hydro and thermal generators. This work presents a methodology for planning of energy commercialization envisaging purchase and sale energy opportunities provided by the new Regulatory Framework of the Brazilian Electric Sector. (author)

  13. Advance of technological innovations of electric power in 2012

    International Nuclear Information System (INIS)

    Mayumi, Akihiko; Tanaka, Masanori; Takebe, Toshiro

    2013-01-01

    Twelve companies in Japan reported on the technological innovations in 2012. The Japan Atomic Power Company mainly studied five projects; (1) control of wall thinning of the secondary system in PWR by injection of molybdic acid, (2) application of pipe test method using electromagnetic acoustic resonance to existing equipment, (3) developed high performance Co-60 crud removal resin for Tsuruga Power Station Unit 2, (4) improvement of technology for safety of core in FBR, and (5) improvement of technology for coolant of FBR by dispersing nano-particles in liquid sodium metal. Tokyo Electric Power Company developed mainly three projects; (1) the support for the mental health care activities by industry protection staff at the Fukushima Daiichi and Daini Nuclear Power Plant, (2) laboratory test method using non-radioactive cesium for performance of decontamination reagent, and (3) decontamination effects estimation code (DeConEP). Hokuriku Electric Power Company reported the operations management measures in accordance with the safety enhancement measures to Shika nuclear power station. Other nine reports are published by Hokkaido Electric Power Co., Inc. Tohoku Electric Power Co., Inc. Chubu Electric Power Co., Inc., The Kansai Electric Power Co., Inc., The Chugoku Electric Power Co., Inc., Shikoku Electric Power Co., Inc., Kyushu Electric Power Co., Inc., Okinawa Electric Power Company Inc. and J-Power. (S.Y.)

  14. Electric power annual 1989. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-17

    This publication presents a summary of electric utility statistics at the national, regional and state levels. The Industry At A Glance'' section presents a profile of the electric power industry ownership and performance; a review of key statistics for the year; and projections for various aspects of the electric power industry through 2010. Subsequent sections present data on generating capability, including proposed capability additions; net generation; fossil-fuel statistics; electricity sales, revenue and average revenue per kilowatthour sold; financial statistics; environmental statistics; and electric power transactions. In addition, the appendices provide supplemental data on major disturbances and unusual occurrences. Each section contains related text and tables and refers the reader to the appropriate publication that contains more detailed data on the subject matter. 24 figs., 57 tabs.

  15. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  16. The using of alternative energy sources: the case of Small Hydroelectric Power Plants and the natural gas fuelled thermal electric power plants; O uso de fontes alternativas de energia: o caso das Pequenas Centrais Hidreletricas (PCHs) e das termoeletricas movidas a gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Patricia Aparecida Pereira; Mauad, Frederico Fabio [Sao Paulo Univ., Sao Carlos, SP (Brazil). Escola de Engenharia. Centro de Recursos Hidricos e Ecologia Aplicada; Leme, Alessandro Andre [Sao Carlos Univ., SP (Brazil). Programa de Pos-graduacao em Ciencias Sociais; Valencio, Norma Felicidade Lopes da Silva [Sao Carlos Univ., SP (Brazil). Dept. de Ciencias Sociais

    2002-07-01

    This paper emphasizes the modifications occurred in the brazilian electric sector at the end of the twenty century. The work also highlight the alternative sources (Small hydroelectric and thermoelectric power plants) as the most feasible in the political and institutional scenery for the complementation of the generator park.

  17. Electricity for road transport, flexible power systems and wind power

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Lars Henrik; Ravn, H.; Meibom, P. (and others)

    2011-12-15

    The aim of the project is to analyse the potential synergistic interplay that may arise between the power sector and the transport sector, if parts of the road transport energy needs are based on electricity via the utilisation of plug-in hybrid electric vehicles and pure electric vehicles. The project focuses on the technical elements in the chain that comprises: 1: The electric vehicle status, potentials and expected development. Electric batteries are in focus in this part of the analysis. 2: Analysis of plug-in hybrid electric vehicle interacting with a local grid. 3: Analysis of grid-vehicle connection systems including technical regulation options and analysis of needs for standardisation. 4: Setting up scenarios covering potential developments for utilizing electric drive trains in road transport. Period: Up to year 2030. 5: Analysis of capacity constraints in the electricity grid (transmission and distribution) as consequence of increasing electricity demand, and new flexible consumption patterns from segments in the transport sector, and as consequence of increasing capacity on wind power in the system. 6: Setting up and analysis of combined scenarios covering both the heat and power system and the transport sector. (Author)

  18. The french electric power evaluation 2005

    International Nuclear Information System (INIS)

    2006-01-01

    This document takes stock on the french electric power situation for the year 2005. It provides information on the consumption the trade, the production, the french market and the RTE (Electric power transport network) infrastructure. (A.L.B.)

  19. Review of Aircraft Electric Power Systems and Architectures

    DEFF Research Database (Denmark)

    Zhao, Xin; Guerrero, Josep M.; Wu, Xiaohao

    2014-01-01

    In recent years, the electrical power capacity is increasing rapidly in more electric aircraft (MEA), since the conventional mechanical, hydraulic and pneumatic energy systems are partly replaced by electrical power system. As a consequence, capacity and complexity of aircraft electric power...... systems (EPS) will increase dramatically and more advanced aircraft EPSs need to be developed. This paper gives a brief description of the constant frequency (CF) EPS, variable frequency (VF) EPS and advanced high voltage (HV) EPS. Power electronics in the three EPS is overviewed. Keywords: Aircraft Power...... System, More Electric Aircraft, Constant Frequency, Variable Frequency, High Voltage....

  20. Methods of formation of efficiency indexes of electric power sources integration in regional electric power systems

    International Nuclear Information System (INIS)

    Marder, L.I.; Myzin, A.I.

    1993-01-01

    A methodic approach to the grounding of the integration process efficiency within the Unified electric power system is given together with the selection of a rational areal structure and concentration of power-generating source capacities. Formation of an economic functional according to alternative scenavies including the cost components taking account of the regional interests is considered. A method for estimation and distribution of the effect from electric power production integration in the power systems under new economic conditions is proposed

  1. Flexibility valuation in the Brazilian power system: A real options approach

    International Nuclear Information System (INIS)

    Marreco, Juliana de Moraes; Carpio, Lucio Guido Tapia

    2006-01-01

    This paper presents a valuation study of operational flexibility in the complex Brazilian Power System. Thermopower plants represent operational flexibility for the national system operator provided they can be dispatched in dry periods to supply part of the load when reservoir waters are too low. Deficit costs can be avoided as a result. We have adopted a real options approach to calculate the fair value of a financial subsidy to be paid to thermal generators for their availability to the system. A financial subsidy is mandatory for their economic feasibility and, therefore, for increased thermopower capacity in the Brazilian Power System. This is why this policy is currently being studied by Brazil's federal government. In order to illustrate our modeling we have run the model for the southeast subsystem. We found a flexibility value of US$4.52 billion, which represents US$497/MW per year. This means that a 100 MW thermopower plant should receive US$49,700 for each year of its economic lifetime as a fair premium incentive to investments

  2. Organization and development of the Brazilian nuclear programme

    International Nuclear Information System (INIS)

    Pinto, C.S.M.; Souza, J.A.M. de; Grinberg, M.; Alves, R.N.; Costa, H.M. da; Grimberg, M.

    1977-01-01

    The paper presents the Brazilian Nuclear Energy Programme, its development, the organizations and the distribution of responsibilities involved in its execution at the present time. The nuclear power policy is established at the Presidency of the Republic and is planned, executed and controlled through the Ministry of Mines and Energy. Directly subject to the Ministry is the Brazilian Nuclear Energy Commission (CNEN), which has regulatory, standardization, licensing, planning and surveillance functions. The nuclear fundamental research and manpower formation are also under CNEN responsibility. Also subject to the Ministry are two companies responsible for the execution of the Programme: the Centrais Eletricas Brasileiras S.A. - Eletrobras, which advises on the granting of permits for the construction and operation of nuclear power plants, and the Empresas Nucleares Brasileiras S.A. - Nuclebras, which holds the monopoly of the nuclear fuel cycle in the country, designs and builds nuclear power plants and provides assistance to the electric utilities and promotes the participation of Brazilian industry. Besides describing the new distribution of regulatory functions given by law to CNEN, the paper gives special emphasis to the large industrial complex in the process of being established through the setting-up of the many Nuclebras subsidiaries in joint venture with German firms under the Industrial Co-operation Agreement Between Brazil and the Federal Republic of Germany in the Field of the Peaceful Uses of Nuclear Energy. The programmes for these subsidiaries are presented and their participation in the Brazilian Nuclear Energy Programme is discussed. The technology transfer aspects of the industrial activities are also discussed. (author)

  3. NSTX Electrical Power Systems

    International Nuclear Information System (INIS)

    A. Ilic; E. Baker; R. Hatcher; S. Ramakrishnan; et al

    1999-01-01

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in the Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems

  4. Import of electric power increased by 19 %

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The import of electric power increased by 19% in 1999. Due to the decrease in the electric power export the net import of electric power increased even more. Electric power import from Sweden was 6000 GWh, import from Russia 5200 GWh and import from Norway 100 GWh. The electric power export in 1999 was only 200 GWh. The generation of nuclear power increased 5% and the consumption of wood-based fuels by 3%. The increase in nuclear power generation is based on increment of the power output capacities of the power plants. The consumption of peat decreased by 12% and the production of hydroelectric power by 15%. The decrement of the peat consumption is based on the changes in energy taxation. The production of hydroelectric power decreased to the normal level after the rainy year 1998. Oil consumption remained nearly the same as in 1998 even though the national product increased in 1999 by 3.5%. The wind power generation was doubled in 1999. The share of it is still only about 0.01% of the total energy consumption. Carbon dioxide emissions from coal and peat, decreased by 1.0 million tons, down to 56 million tons. The present emissions are now only about 2 million tons higher than during the reference year 1990. The emissions have decreased by 5 million tons since 1996 when they were at their highest

  5. Applying reliability analysis to design electric power systems for More-electric aircraft

    Science.gov (United States)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  6. New electric power market

    International Nuclear Information System (INIS)

    Zorzoli, G.B.

    1992-01-01

    In a trend analysis of methods of energy production and use, this paper cites forecasted significant gains in efficiency through the use of combined cycles for heat and power production, and rapidly falling costs of solar and wind power plants. A technical/economic feasibility analysis is then performed on the future use of electric vehicles in Italy. Here, the paper cites the possible benefits in terms of energy conservation and air pollution abatement. A review is made of current progress in research efforts aimed at reducing electric battery sizing, weight and recharging constraints

  7. Power Electronics and Electric Machines Facilities | Transportation

    Science.gov (United States)

    Research | NREL Facilities Power Electronics and Electric Machines Facilities NREL's power electronics and electric machines thermal management experimentation facilities feature a wide range of four researchers in discussion around a piece of laboratory equipment. Power electronics researchers

  8. 18 CFR 801.12 - Electric power generation.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Electric power generation. 801.12 Section 801.12 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.12 Electric power generation. (a) Significant uses are presently being made...

  9. Electric power annual 1998. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    The purpose of this report, Electric Power Annual 1998 Volume 1 (EPAVI), is to provide a comprehensive overview of the electric power industry during the most recent year for which data have been collected, with an emphasis on the major changes that occurred. In response to the changes of 1998, this report has been expanded in scope. It begins with a general review of the year and incorporates new data on nonutility capacity and generation, transmission information, futures prices from the Commodity futures Trading commission, and wholesale spot market prices from the pennsylvania-new Jersey-Maryland Independent System Operator and the California Power Exchange. Electric utility statistics at the Census division and State levels on generation, fuel consumption, stocks, delivered cost of fossil fuels, sales to ultimate customers, average revenue per kilowatthour of electricity sold, and revenues from those retail sales can be found in Appendix A. The EPAVI is intended for a wide audience, including Congress, Federal and State agencies, the electric power industry, and the general public.

  10. Defence in depth for electric power supplies in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Gupta, S.K.; Srivasista, K.; Solanki, R.B.

    2009-01-01

    The purpose of electric power supply system in a nuclear power plant is to supply and distribute reliable electric power to safety related systems and systems important to safety in various forms, arrangements and combinations of redundancy and diversity in order to perform safety functions required during operational states and design basis events (DBE) such as shutting down the reactor, maintaining the reactor in safe shutdown state, containment isolation and reactor core cooling preventing significant release of radioactive material to the environment. Hence the design basis of electric power supply systems includes identification of DBE that require power supplies, adequacy of redundancy and diversity, environmental conditions to which electric equipment are qualified, identification of loads requiring interrupted and uninterrupted power supplies, time sequence in which emergency loads are to be supplied in case of interruption, provisions for maintaining and testing, consideration for minimum duration capability of emergency power supplies during station blackout etc. Based on operation experience, results of probability safety assessment and certain weaknesses noticed in defence in depth of electric power supply systems, several continuous design improvements have been made in Indian nuclear power plants during operating phase and life extension. Instituting various tests during initial commissioning, subsequent operation and life extension has ensured high standards of performance of electric power supplies. Some of these aspects are highlighted in this paper

  11. Innovation in electric power technologies in 2009

    International Nuclear Information System (INIS)

    Ohfusa, Takahiro; Hayasaka, Eiji; Ino, Hiroyuki

    2010-01-01

    This is a report of the title by Tokyo Electric Power Company, Kansai Electric Power Co., Inc, Tohoku Electric Power and other nine enterprises in Japan. The outline is as follows. Tokyo Electric Power Company stated pipe thinning by the hot water based two-phase flow testing device, development of technologies for corrosion protection of nuclear reactor using titanium oxide, evaluation of fatigue damage by EBSD, and study of duty on the nuclear power plant. Japan Atomic Power Company (JAPC) stated the mechanism of decrease in exposure dose of the primary coolant system by zinc infusion, outline of Air Operated Valve Intelligent Diagnostic Analysis System (AVIDAS) and the grand packing system, development of SAPLS, the automatic search program of fuel position for design of PWR related core, development of compact containment water reactor (CCR) and FBR cycle system, investigation of the chain destruction of active fault under consideration of dynamic interaction of active faults and decommissioning of Tokai Nuclear Power Plant. Electric Power Development Company reported construction of the Oma Nuclear Power Plant, a future nuclear plant in Oma, Aomori. The reactor will be capable of using 100% MOX fuel core (MOX-ABWR). The operation will start November 2014. (S.Y.)

  12. Electric Power Monthly, August 1990. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    1990-11-29

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and State level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data includes generation by energy source (coal, oil, gas, hydroelectric, and nuclear); generation by region; consumption of fossil fuels for power generation; sales of electric power, cost data; and unusual occurrences. A glossary is included.

  13. Fitting of power generated by nuclear power plants into the Hungarian electricity system

    International Nuclear Information System (INIS)

    Lengyel, Gyula; Potecz, Bela

    1984-01-01

    The moderate increase of electrical energy demands (3% at present) can only be met by the parallel application of fossil and nuclear power plants and by electric power import via the transmission lines of the CMEA countries. The changes in the electrical energy and fuel demands and the development of the available capacities during the last 35 years are reviewed. The major purpose of Hungarian power economy is to save hydrocarbon fuels by taking advantages of power import opportunities by operating nuclear power plants at maximum capacity and the coal fired power stations at high capacity. The basic principles, the algorithm applied to optimize the load distribution of the electrical power system are discussed in detail with special attention to the role of nuclear power. The planned availability of nuclear power plants and the amount of electricity generated by nuclear plants should also be optimized. (V.N.)

  14. Necessity of electricity and the unavoidable use of nuclear energy

    International Nuclear Information System (INIS)

    1987-01-01

    The development of fast breeder type reactors is presented as the best and practically the unique energetic solution for Brazilian future. The program of development proposed by IEAv (Intitute of Advanced Studies) researchers aim to supply enough and constant electricity, transforming the Brazilian energy power, practically infinite by using nuclear reactors inherently more safe than other existing in developed countries. (M.C.K.) [pt

  15. Galena Electric Power A Situational Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Robert E. Chaney; Stephen G. Colt; Ronald A. Johnson; Richard W. Wiles; Gregory J. White

    2008-12-31

    The purpose of the investigation is to compare the economics of various electrical power generation options for the City of Galena. Options were assessed over a 30-year project period, beginning in 2010, and the final results were compared on the basis of residential customer electric rates ($/kWh). Galena's electric utility currently generates power using internal combustion diesel engines and generator sets. Nearby, there is an exposed coal seam, which might provide fuel for a power plant. Contributions to the energy mix might come from solar, municipal solid waste, or wood. The City has also been approached by Toshiba, Inc., as a demonstration site for a small (Model 4S) nuclear reactor power plant. The Yukon River is possibly a site for in-river turbines for hydroelectric power. This report summarizes the comparative economics of various energy supply options. This report covers: (1) thermal and electric load profiles for Galena; (2) technologies and resources available to meet or exceed those loads; (3) uses for any extra power produced by these options; (4) environmental and permitting issues and then; and (5) the overall economics of each of the primary energy options.

  16. New record in import of electric power in 2000

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    In spite of the mild weather in the year 2000 the electric power consumption in Finland increased by nearly 2%. The electric power consumption would be twice as high if the temperatures would have been the same as usually. Hydroelectric power generation in Norway, Sweden and Finland in 2000 was about 40 TWh higher than in 1999. The retained import of electric power in the year 2000 reached a new record, being 11.9 TWh, corresponding to 15% of the annual power consumption in Finland. The GNP in Finland increased in 2000 by 5.7%, and the estimate for 2001 is 4.5%. Total power consumption in Finland in 2000 was 79.1 TWh, which is 1.7% higher than in 1999. About 60% of the increase were covered by import of electric power and 40 % by increasing own power generation. The share of CHP production was 31% of the total power consumption, the share of nuclear power being 27%, the share of hydroelectric power 18% and that of coal and other common condensing power about 8%. The share of retained electric power import was 15%. The Finnish hydroelectric power plants generated 14.4 TWh electric power, which is nearly 15% more than in 1999. Due to the increased production of hydroelectric power and power import the production of coal and other condensing power decreased nearly 9%. The wind power generation increased rapidly being, however, only about 0.1% of the electric power consumption. Industrial power consumption was about 55% of the total, the share of households and agriculture being nearly 24%, and those of services and public sector over 17%. Power transmission and delivery losses were less than 4%. The electric power consumption of households decreased by nearly 2% due to the worm end of the year. The share of other consumers increased by nearly 3%. About 13 000 households acquired electric heating, so the number of electrically heated houses in Finland is 593 000 households. The industrial electric power consumption increased in 2000 by 2.7% up to 43.2 TWh. The share of

  17. Electric Power Monthly, July 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-12

    The Electric Power Monthly (EPM) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost in fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 12 refs., 4 figs., 48 tabs.

  18. Impact of energy efficiency and alternative sources in the Brazilian electric matrix: scenarios 2005-2050; Impacto da eficiencia energetica e das fontes alternativas na matriz eletrica brasileira: cenarios 2005-2050

    Energy Technology Data Exchange (ETDEWEB)

    Saidel, Marco A.; Gimenes, Andre L.V.; Fujii, Ricardo J. [Universidade de Sao Paulo (GEPEA/USP), SP (Brazil). Dept. de Energia e Automacao Eletricas. Grupo de Energia; Furtado, Marcelo [Greenpeace Brasil, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Part of a worldwide initiative championed by Greenpeace International and EREC - European Renewable Energy Council, a partnership between Greenpeace Brazil and GEPEA/USP were established for producing two national alternative energy scenarios, as a blueprint for how to meet forthcoming Brazilian energy needs in a sustainable way. Such scenarios, one reflecting the views of GEPEA/USP and another the perceptions by Greenpeace, were both based on a reference scenario strongly drawing from the 'Plano Decenal 2006-2015' and the 'Plano Nacional de Energia 2030', both by the Ministry of Mines and Energy. From the alternative scenarios one may see that is feasible to satisfy the increasing Brazilian demand through the integrated deployment of alternative resources, Natural Gas fueled thermal power plants and energy conservation measures. To develop the Brazilian electricity energy base in such terms, however, is mandatory to conduct further debate on energy planning issues, conservation measures and alternatives resources concerns included. (author)

  19. Electric power. Enron establishes in Italy

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The US Enron group and the Italian Enel group have decided to create a joint-venture for the production of electric power in Italy. Their activities will be based on the transformation of existing classical thermal power plants into natural gas fueled combined cycle power plants. The total capacity of the converted power plants will be of 5000 MW. Enron should invest about 3 billions of US Dollars in this project and will be in a privileged position when the Italian electric power market will be open to competition in 1999. Short paper. (J.S.)

  20. Electrical Power Budget for FCC-ee

    CERN Document Server

    Aull, S.; Bozzini, D.; Brunner, O.; Burnet, J.-P.; Butterworth, A.; Calaga, R.; Jensen, E.; Mertens, V.; Milanese, A.; Nonis, M.; Oide, K.; Schwerg, N.; Tavian, L.; Wenninger, J.; Zimmermann, F.; Rinolfi, L; Blondel, A.; Koratzinos, M.; Gorgi Zadeh, S.

    2016-01-01

    We present a first rough estimate for the electrical power consumption of the FCC-ee lepton collider. This electrical power is dominated by the RF system, which provides the motivation for the ongoing R&D on highly efficient RF power sources. Other contributions come from the warm arc magnets, the cryogenics systems, cooling, ventilation, general services, the particle-physics detectors, and the injector complex.

  1. Values in the electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    Sayre, K. (ed.)

    1977-01-01

    A basic conclusion established by the seven essays presented is that nowhere within the complex decision-making process of the electric power industry is there any provision for systematically considering the curtailment of consumption as a serious alternative to continued expansion of power production. Six recommendations are summarized for concrete steps toward remedying this deficiency as a result of examining the essays. Continued expansion of power generation could result in desirable consequences of economic growth, jobs, ready transportation, and many consumer conveniences; undesirable consequences are: increasing air and water pollution, further depletion of nonrenewable resources, and increased dependence on foreign sources of energy. The papers are: A Cybernetic Analysis of Certain Energy Consumption Patterns, by Kenneth Sayre; Social and Environmental Value in Power Plant Licensing: A Study in the Regulation of Nuclear Power by Vaughn McKim; Legal and Economic Aspects of the Electric Utility's ''Mandate to Serve'', by Charles Murdock; Economies of Scale in the Electric Power Industry, by Kenneth Jameson; Dynamics of Growth in the U.S. Electric Power Industry, by Ellen Maher; Utilitarianism and Cost-Benefit Analysis: An Essay on the Relevance of Moral Philosophy to Bureaucratic Theory, by Alasdair MacIntyre; and An Ethical Analysis of Power Company Decision-Making, by Kenneth Goodpaster and Kenneth Sayre. (MCW)

  2. Powering China: Reforming the electric power industry in China

    International Nuclear Information System (INIS)

    Yi-Chong Xu

    2002-01-01

    The book reports on the rapidly changing face of the electricity business in China. Reforms by the central government and the need for more and more electric power have pushed the electricity sector from a central planned economy to a markets-based system. The international ramifications of China's reform programme are discussed. The author describes electricity industry reform in other countries including the USA and UK. The author points out that in China after 1998 there was a move to recentralise control but by then it was too late to reverse the reforms. The problems of tariff policies, pricing, and sources of new investments, including from foreign countries, are discussed. The final section of the book deals with problems arising from the need for massive retrenchment of power-section workers, cross-subsidies, and triangular debts. The book is said to provide a sound description of the political economy of power reform in China without getting bogged down in economic modelling

  3. Critical success factors for BOT electric power projects in China: Thermal power versus wind power

    Energy Technology Data Exchange (ETDEWEB)

    Zhao, Zhen-Yu. [School of Business Administration, North China Electric Power University, Beijing 102206 (China); Zuo, Jian; Zillante, George [School of Natural and Built Environments, University of South Australia, Adelaide 5001 (Australia); Wang, Xin-Wei [Shandong Nuclear Power Equipment Manufacturing Co. Ltd, Haiyang, Shandong 265118 (China)

    2010-06-15

    Chinese electric power industry has adopted Build-Operate-Transfer (BOT) approach in a number of projects to alleviate the pressure of sole state-owned investment. The Chinese government has taken enormous efforts to create an environment to facilitate the application of BOT approach in electric power projects. Moreover, the growing attention on the sustainability issues puts the traditional major source of electricity - thermal power project under more strict scrutiny. As a result, various renewable energy projects, particularly the wind power projects have involved private sector funds. Both thermal power and wind power projects via BOT approach have met with a varying degree of success. Therefore, it is imperative to understand the factors contributing towards the success of both types of BOT power projects. Using an extensive literature survey, this paper identifies 31 success factors under 5 categories for Chinese BOT electric power projects. This is followed by a questionnaire survey to exam relative significance of these factors. The results reveal the different levels of significance of success factors for BOT thermal power projects versus wind power projects. Finally, survey results were analyzed to explore the underlying construction and distributions among the identified success factors. This study provides a valuable reference for all involved parties that are interested in developing BOT electric power projects in China. (author)

  4. The future of fission-electric power

    International Nuclear Information System (INIS)

    Morowski, J.V.

    1983-06-01

    Future worldwide electricity supply needs dictate the necessity of maintaining a sound capability for electricity and electric power generating facilities, including nuclear, as viable export commodities. A survey of fission-power plant types and the status of worldwide nuclear electric power illustrates the primary emphasis on LWR's and HWR's as two leading types in the export market. This survey examines the factors affecting the market prospects for the next five to fifteen years and provides a discussion on some possible improvements to current market circumstances. A comparative description is provided for some of the types of LWR and CANDU characteristics such as quantities, schedules, constructability factors, and equipment and system. Important factors in the selection process for future nuclear power plants are discussed. Some factors included are seismic design requirements; plant design description and possible site layout; plant protection, control and instrumentation; thermal cycle design and arrangement; and special construction and rigging requirements

  5. Electric power in Canada 1993

    International Nuclear Information System (INIS)

    1994-01-01

    The electric power industry in Canada in 1993 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Information is appended on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 26 figs., 90 tabs

  6. Demonstration tokamak fusion power plant for early realization of net electric power generation

    International Nuclear Information System (INIS)

    Hiwatari, R.; Okano, K.; Asaoka, Y.; Shinya, K.; Ogawa, Y.

    2005-01-01

    A demonstration tokamak fusion power plant Demo-CREST is proposed as the device for early realization of net electric power generation by fusion energy. The plasma configuration for Demo-CREST is optimized to satisfy the electric breakeven condition (the condition for net electric power, P e net = 0 MW) with the plasma performance of the ITER reference operation mode. This optimization method is considered to be suitable for the design of a demonstration power plant for early realization of net electric power generation, because the demonstration power plant has to ensure the net electric generation. Plasma performance should also be more reliably achieved than in past design studies. For the plasma performance planned in the present ITER programme, net electric power from 0 to 500 MW is possible with Demo-CREST under the following engineering conditions: maximum magnetic field 16 T, thermal efficiency 30%, NBI system efficiency 50% and NBI current drive power restricted to 200 MW. By replacing the blanket system with one of higher thermal efficiency, a net electric power of about 1000 MW is also possible so that the performance of the commercial plant with Demo-CREST can also be studied from the economic point of view. The development path from the experimental reactor 'ITER' to the commercial plant 'CREST' through the demonstration power plant 'Demo-CREST' is proposed as an example of the fast track concept. (author)

  7. Electric Power Research in 1988 No. 5

    International Nuclear Information System (INIS)

    1989-06-01

    This book deals with eight fields of electric power, which are study on the high level of confidence of electronic control system with micro computers in a field of generator, study on the emergency scenarios of radiation in nuclear power plant in a field of nuclear energy, research for improvement of record and calculation of SCADA system in a field of supply of electric power, study on the utilization and survey of domestic Bio-mass in a field of energy, and study on the digital communications net for electric power in a field of communication.

  8. Equilibrium pricing in electricity markets with wind power

    Science.gov (United States)

    Rubin, Ofir David

    Estimates from the World Wind Energy Association assert that world total wind power installed capacity climbed from 18 Gigawatt (GW) to 152 GW from 2000 to 2009. Moreover, according to their predictions, by the end of 2010 global wind power capacity will reach 190 GW. Since electricity is a unique commodity, this remarkable expansion brings forward several key economic questions regarding the integration of significant amount of wind power capacity into deregulated electricity markets. The overall dissertation objective is to develop a comprehensive theoretical framework that enables the modeling of the performance and outcome of wind-integrated electricity markets. This is relevant because the state of knowledge of modeling electricity markets is insufficient for the purpose of wind power considerations. First, there is a need to decide about a consistent representation of deregulated electricity markets. Surprisingly, the related body of literature does not agree on the very economic basics of modeling electricity markets. That is important since we need to capture the fundamentals of electricity markets before we introduce wind power to our study. For example, the structure of the electric industry is a key. If market power is present, the integration of wind power has large consequences on welfare distribution. Since wind power uncertainty changes the dynamics of information it also impacts the ability to manipulate market prices. This is because the quantity supplied by wind energy is not a decision variable. Second, the intermittent spatial nature of wind over a geographical region is important because the market value of wind power capacity is derived from its statistical properties. Once integrated into the market, the distribution of wind will impact the price of electricity produced from conventional sources of energy. Third, although wind power forecasting has improved in recent years, at the time of trading short-term electricity forwards, forecasting

  9. The obtention of high reliability levels to the increasing of power in hydroelectric generators of modern power plants; A obtencao de altos indices de confiabilidade no aumento de potencia em hidrogeradores de usinas modernizadas

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Octavio A.; Uemori, Mauro K.I.; Spiridon, Michel W. [Asea Brown Boveri Ltda., Osasco, SP (Brazil)

    1993-12-31

    The increase in the power capacity of the generators of existing hydroelectric power plants is presented as an alternative technically feasible and economically advantageous to the increase of the power generation capacity of the Brazilian electric power system. This work presents the need of a global analysis of each case in order to optimize this process and also presents a methodology which may be applied to electric power generators, turbines, transformers and other electrical equipment. 2 refs., 8 figs.

  10. Competitiveness of nuclear power in Japanese liberalized electricity market

    International Nuclear Information System (INIS)

    Abe, Y.

    2006-01-01

    The liberalization of Japanese electricity market expanded to customers of over 50 kV on April 1, 2005 and more than 60% of the market has been already open. The discussion about the assistance measures of nuclear power generation in Japanese liberalization of electricity market has come to grow warmer gradually. The opinions on the competitiveness of nuclear power are inconsistency among the supporters of nuclear power. Some says that nuclear power is the most competitive, others says nuclear power require some sort of financial or political assistance in the deregulation of electricity market. In this study, based on financial statements of each Japanese electric power company, the constitution of generation cost of nuclear power is illustrated and various financial and economic characteristics, including ''merit of scale'' and the impact of new nuclear power plant construction on the finance of electric power company, are discussed. In addition, the economic features of nuclear power generation are compared with those of thermal power generation through the analysis of financial statements. Finally, support policies for nuclear power required in deregulation of electric utilities are examined in terms of fairness of competition and security of electricity supply

  11. The future of electric power supply

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    In this interview with a prominent expert of the electric power industry, problems of assuring electricity supply, the economics of nuclear electricity generation, the supply structure, and cogeneration are discussed. (UA) [de

  12. Electric power supply in China. Pt. 1

    International Nuclear Information System (INIS)

    Chen Heng

    1987-01-01

    Professor Chen, visiting professor at the RWTH Aachen, gave several lectures dealing with his country, the electric power supply in China and with special research activities of Chinese scientists. This article is based on two of his lectures, and will be published in two parts, the first of which provides a brief description of China, an overview on electric power supply, and a brief description of the large power plants and large electrical subsystems. The second part will deal with operation planning, extension planning as well as with research and development in the field of electric energy supply. (orig.) [de

  13. Virtual Power Plants of Electric Vehicles in Sustainable Smart Electricity Markets

    NARCIS (Netherlands)

    M.T. Kahlen (Micha)

    2017-01-01

    markdownabstractThe batteries of electric vehicles can be used as Virtual Power Plants to balance out frequency deviations in the electricity grid. Carsharing fleet owners have the options to charge an electric vehicle's battery, discharge an electric vehicle's battery, or keep an electric vehicle

  14. Probabilistic Fault Diagnosis in Electrical Power Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — Electrical power systems play a critical role in spacecraft and aircraft. This paper discusses our development of a diagnostic capability for an electrical power...

  15. Study of aircraft electrical power systems

    Science.gov (United States)

    1972-01-01

    The formulation of a philosophy for devising a reliable, efficient, lightweight, and cost effective electrical power system for advanced, large transport aircraft in the 1980 to 1985 time period is discussed. The determination and recommendation for improvements in subsystems and components are also considered. All aspects of the aircraft electrical power system including generation, conversion, distribution, and utilization equipment were considered. Significant research and technology problem areas associated with the development of future power systems are identified. The design categories involved are: (1) safety-reliability, (2) power type, voltage, frequency, quality, and efficiency, (3) power control, and (4) selection of utilization equipment.

  16. PROVIDING QUALITY OF ELECTRIC POWER IN ELECTRIC POWER SYSTEM IN PARALLEL OPERATION WITH WIND TURBINE

    Directory of Open Access Journals (Sweden)

    Yu. A. Rolik

    2016-01-01

    Full Text Available The problem of providing electric power quality in the electric power systems (EPS that are equipped with sufficiently long air or cable transmission lines is under consideration. This problem proved to be of particular relevance to the EPS in which a source of electrical energy is the generator of wind turbines since the wind itself is an instable primary energy source. Determination of the degree of automation of voltage regulation in the EPS is reduced to the choice of methods and means of regulation of power quality parameters. The concept of a voltage loss and the causes of the latter are explained by the simplest power system that is presented by a single-line diagram. It is suggested to regulate voltage by means of changing parameters of the network with the use of the method of reducing loss of line voltage by reducing its reactance. The latter is achieved by longitudinal capacitive compensation of the inductive reactance of the line. The effect is illustrated by vector diagrams of currents and voltages in the equivalent circuits of transmission lines with and without the use of longitudinal capacitive compensation. The analysis of adduced formulas demonstrated that the use of this method of regulation is useful only in the systems of power supply with a relatively low power factor (cosφ < 0.7 to 0.9. This power factor is typical for the situation of inclusion the wind turbine with asynchronous generator in the network since the speed of wind is instable. The voltage regulation fulfilled with the aid of the proposed method will make it possible to provide the required quality of the consumers’ busbars voltage in this situation. In is turn, it will make possible to create the necessary conditions for the economical transmission of electric power with the lowest outlay of reactive power and the lowest outlay of active power losses.

  17. Electrical power technology for robotic planetary rovers

    Science.gov (United States)

    Bankston, C. P.; Shirbacheh, M.; Bents, D. J.; Bozek, J. M.

    1993-01-01

    Power technologies which will enable a range of robotic rover vehicle missions by the end of the 1990s and beyond are discussed. The electrical power system is the most critical system for reliability and life, since all other on board functions (mobility, navigation, command and data, communications, and the scientific payload instruments) require electrical power. The following are discussed: power generation, energy storage, power management and distribution, and thermal management.

  18. Electric power transport costs - methodologies analysis; Custos de transporte de energia eletrica: analise de metodologias

    Energy Technology Data Exchange (ETDEWEB)

    Takahata, Dario

    1997-07-01

    The dissertation presents the aspects related to the restructuring of power systems in terms of international experiences, and the possible implications for the definition of the new power system in Brazil. The experience shows that the reform in various countries has started from the sector deverticalization, together with the transmissions open access scheme. The retrospect of researched countries indicates that the transmissions remuneration is based on a methodology that recovers the operative cost of transmission transactions, along with an additional amount that take into account the cost of the existing transmission system. The following countries have been analyzed: Chile, Norway, England and Argentina. This work also shows the current situation in Brazil, as in terms of tariffs, as regarding the power system organizational structure, as well as a preliminary proposal conceived by SINTREL (National System of Electrical Energy Transmission) to evaluate the transmission transaction cost. This dissertation ended with comments and conclusions, depicting a future program which might be followed, considering the aspects quoted above and the peculiarities of brazilian power system. (author)

  19. Electric power balance sheet 2013

    International Nuclear Information System (INIS)

    2014-01-01

    The mission of RTE, the French electricity Transportation grid, a public service assignment, is to balance the electricity supply and demand in real time. This report presents RTE's technical results for the year 2013: stabilisation of the electricity consumption in France, high level of hydropower generation, fast evolution of the European power network, electricity markets in a transition situation, adaptation of RTE's network to the evolutions of the energy system

  20. Electric power in Canada 1993

    International Nuclear Information System (INIS)

    1994-01-01

    The electric power industry in Canada in 1993 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Appended information is presented on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 23 figs., 95 tabs

  1. Electric power in Canada 1992

    International Nuclear Information System (INIS)

    1993-01-01

    The electric power industry in Canada in 1991 is reviewed. Items discussed include: the international context of Canadian electricity; regulatory structures; electricity and the environment; electricity consumption; electricity generation; generating capacity and reserve; electricity trade; transmission; electric utility investment and financing; costing and pricing; electricity outlook; demand-side management; and non-utility generation. Appended information is presented on installed capacity and electrical energy consumption in Canada, installed generating capacity, conventional thermal capacity by principal fuel type, provincial electricity imports and exports, Canadian electricity exports by exporter and importer, generation capacity by type, installed generating capacity expansion in Canada by station, federal environmental standards and guidelines, and prices paid by major electric utilities for non-utility generation. 26 figs., 90 tabs

  2. The Relationship Between Electricity Price and Wind Power Generation in Danish Electricity Markets

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2010-01-01

    of competitive electricity markets in some ways, is chosen as the studied power system. The relationship between the electricity price (both the spot price and the regulation price) and the wind power generation in an electricity market is investigated in this paper. The spot price, the down regulation price...... and the up regulation price generally decreases when the wind power penetration in the power system increases. The statistical characteristics of the spot price for different wind power penetration are analyzed. The findings of this paper may be useful for wind power generation companies to make the optimal...... bidding strategy and may be also useful for the optimal operation of modern power systems with high wind power penetrations....

  3. Nuclear power's effects on electric rate making

    International Nuclear Information System (INIS)

    Smith, D.S.; Lancaster, A.A.

    1978-01-01

    Government and the electric utility industry are re-evaluating nuclear power's contribution to the total U.S. energy supplies. This article addresses how the recently increased nuclear plant construction and operation costs are translated into the prices that consumers pay for electricity. The electric rates that consumers pay must reflect the costs of producing electricity, as well as the costs of transmission, distribution, metering, and billing. The use of nuclear power for electric production is anticipated to grow rapidly so as to meet a larger portion of our country's electricity needs through the end of the century; so nuclear power costs are expected to be an even larger portion of the total electricity price. There are certain rate-making issues that are actively being discussed in public forums and before state and Federal regulatory bodies. These issues are not unique to nuclear power, but take on added significance when nuclear power is used by utilities to produce electricity because of the technology required and because of the type, timing, and magnitude of the costs involved. These are: (1) inclusion of construction work in progress in the rate base; (2) fuel adjustment clauses and treatment of nuclear fuel cycle costs; (3) treatment of certain taxes under the rate-making method called normalization or deferral accounting (sometimes referred to as ''phantom taxes''); and (4) rate treatment for particular nuclear expense items reflecting costs of delays, plant cancellations, and operational slowdowns

  4. The role of nuclear power in the global electric power system

    International Nuclear Information System (INIS)

    Sidorenko, V.A.; Chernilin, Yu.F.

    1992-01-01

    Basic conclusions and recommendations developed in the process of preparing and conducting the symposium discussed are presented. All methods of electric power production, their prospects and effects on man and environment were discussed during the symposium. This paper is devoted mainly to nuclear power engineering only, its prospects and possible role in general electric power generation

  5. Possibilities for retrofitting of the existing thermal electric power plants using solar power technologies

    International Nuclear Information System (INIS)

    Matjanov, Erkinjon K.; Abduganieva, Farogat A.; Aminov, Zarif Z.

    2012-01-01

    Full text: Total installed electric power output of the existing thermal electric power plants in Uzbekistan is reaches 12 GW. Thermal electric power plants, working on organic fuel, produce around 88 % of the electricity in the country. The emission coefficient of CO 2 gases is 620 gram/kwph. Average electric efficiency of the thermal electric power plants is 32.1 %. The mentioned above data certifies, that the existing thermal electric power plants of Uzbekistan are physically and morally aged and they need to be retrofitted. Retrofitting of the existing thermal electric power plants can be done by several ways such as via including gas turbine toppings, by using solar technologies, etc. Solar thermal power is a relatively new technology which has already shown its enormous promise. With few environmental impacts and a massive resource, it offers a comparable opportunity to the sunniest Uzbekistan. Solar thermal power uses direct sunlight, so it must be sited in regions with high direct solar radiation. In many regions, one square km of land is enough to generate as much as 100-120 GWh of electricity per year using the solar thermal technology. This is equivalent to the annual production of a 50 MW conventional coal or gas-fired mid-load power plant. Solar thermal power plants can be designed for solar-only or for hybrid operation. Producing electricity from the energy in the sun's rays is a straightforward process: direct solar radiation can be concentrated and collected by a range of Concentrating Solar Power technologies to provide medium- to high temperature heat. This heat is then used to operate a conventional power cycle, for example through a steam turbine or a Stirling engine. Solar heat collected during the day can also be stored in liquid or solid media such as molten salts, ceramics, concrete or, in the future, phase-changing salt mixtures. At night, it can be extracted from the storage medium thereby continuing turbine operation. Currently, the

  6. The electric power engineering handbook power systems

    CERN Document Server

    2012-01-01

    Power Systems, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) covers all aspects of power system protection, dynamics, stability, operation, and control. Under the editorial guidance of L.L. Grigsby, a respected and accomplished authority in power engineering, and section editors Andrew Hanson, Pritindra Chowdhuri, Gerry Sheble, and Mark Nelms, this carefully crafted reference includes substantial new and revised contributions from worldwide leaders in the field. This content provides convenient access to overviews and detailed information on a diverse arr

  7. Context analysis for a new regulatory model for electric utilities in Brazil

    International Nuclear Information System (INIS)

    El Hage, Fabio S.; Rufín, Carlos

    2016-01-01

    This article examines what would have to change in the Brazilian regulatory framework in order to make utilities profit from energy efficiency and the integration of resources, instead of doing so from traditional consumption growth, as it happens at present. We argue that the Brazilian integrated electric sector resembles a common-pool resources problem, and as such it should incorporate, in addition to the centralized operation for power dispatch already in place, demand side management, behavioral strategies, and smart grids, attained through a new business and regulatory model for utilities. The paper proposes several measures to attain a more sustainable and productive electricity distribution industry: decoupling revenues from volumetric sales through a fixed maximum load fee, which would completely offset current disincentives for energy efficiency; the creation of a market for negawatts (saved megawatts) using the current Brazilian mechanism of public auctions for the acquisition of wholesale energy; and the integration of technologies, especially through the growth of unregulated products and services. Through these measures, we believe that Brazil could improve both energy security and overall sustainability of its power sector in the long run. - Highlights: • Necessary changes in the Brazilian regulatory framework towards energy efficiency. • How to incorporate demand side management, behavioral strategies, and smart grids. • Proposition of a market for negawatts at public auctions. • Measures to attain a more sustainable electricity distribution industry in Brazil.

  8. Biannual bulletin of SIESE (Enterprise Information System of the Electric Energy Sector). Jan-Sep 1995

    International Nuclear Information System (INIS)

    1995-01-01

    The statistical results of Brazilian electric power sector, referring to the first semester of 1996 are shown, presenting the nominal capacity, energy supplying, hydraulic and thermal generation, consumption of oil, charcoal, natural gas, uranium dioxide and coal fuels, and also the electric power consumption in the residential, commercial and industrial sectors. The extension of transmission lines, power installed, operational data, nominal capacity, gross generation and tariffs are also presented

  9. Biannual bulletin of SIESE (Enterprise Information System of the Electric Energy Sector). Jan-Sep 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The statistical results of Brazilian electric power sector, referring to the first semester of 1996 are shown, presenting the nominal capacity, energy supplying, hydraulic and thermal generation, consumption of oil, charcoal, natural gas, uranium dioxide and coal fuels, and also the electric power consumption in the residential, commercial and industrial sectors. The extension of transmission lines, power installed, operational data, nominal capacity, gross generation and tariffs are also presented

  10. Economic market design and planning for electric power systems

    CERN Document Server

    Mili, Lamine

    2010-01-01

    Discover cutting-edge developments in electric power systems. Stemming from cutting-edge research and education activities in the field of electric power systems, this book brings together the knowledge of a panel of experts in economics, the social sciences, and electric power systems. In ten concise and comprehensible chapters, the book provides unprecedented coverage of the operation, control, planning, and design of electric power systems. It also discusses:. A framework for interdisciplinary research and education;. Modeling electricity markets;. Alternative economic criteria and proactiv.

  11. Power Electronics and Electric Machines | Transportation Research | NREL

    Science.gov (United States)

    Power Electronics and Electric Machines NREL's power electronics and electric machines research helping boost the performance of power electronics components and systems, while driving down size, weight technical barriers to EDV commercialization. EDVs rely heavily on power electronics to distribute the proper

  12. Electric cars as mobile power storage systems

    International Nuclear Information System (INIS)

    Herzog, B.

    2010-01-01

    This article discusses the use of electric cars as a means of optimising the use of renewable energy sources. Charging the cars' batteries during periods when cheap electricity prices prevail and then using excess capacity to supply the mains with electricity during periods of peak demand is discussed. The possible use of wind for power generation is discussed and a system proposed by a leading supplier of electrical apparatus and systems is examined. Two examples of electric cars and associated power chains are looked at and tests in everyday practice are described

  13. REACTIVE POWER DEVICES IN SYSTEMS OF ELECTRIC TRACTION

    Directory of Open Access Journals (Sweden)

    M. O. Kostin

    2010-04-01

    Full Text Available A comparative characteristic of different concepts and expressions for determination of reactive power in the circuits with non-sinusoidal electric values has been given. For the first Ukrainian electric locomotives of DE1 type with the system of DC electric traction, the values of reactive power after Budeany, Fryze, and also the differential, integral and generalized reactive powers have been determined. Some measures on reducing its consumption by the DC electric rolling stock have been suggested.

  14. The sustainable expansion of the brazilian electric sector from the use of sustainability indicators as support instruments to decision; A expansao sustentavel do setor eletrico brasileiro a partir do uso de indicadores de sustentabilidade como instrumento de apoio a decisao

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Luciano B. [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Inst. Virtual Internacional de Mudancas Globais (IVIG)]. E-mail: luciano@ivig.coppe.ufrj.br; Soares, Jeferson B. [Empresa de Pesquisa Energetica (EPE), Brasilia, DF (Brazil). Superintendencia de Recursos Energeticos]. E-mail: jeferson.soares@epe.gov.br; Rovere, Emilio L. La [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Lab. Interdisciplinar de Meio Ambiente (LIMA)]. E-mail: emilio@ppe.ufrj.br

    2006-07-01

    This article presents a proposal of an integrated evaluation methodology of offer electric energy expansion, considering not only technological and economical aspects but the environmental and social aspects as well. The proposal is based on the establishment of an indicators set for electricity generation from: small hydroelectric power plants, sugar cane bagasse, biodiesel, eolic wind, urban solid residues and natural gas. From those indicators a multicriteria analysis is applied to a case study, allowing to learn simultaneously the influence of environmental and social questions on the decision making of the brazilian electric sector expansion.

  15. Nuclear energy products except the electric power

    International Nuclear Information System (INIS)

    2004-01-01

    Technically the fission reactors, on service or under construction, can produce other products than the electric power. Meanwhile, these applications are known since the beginning of the reactors exploitation, they never have been developed industrially. This report examines the necessary technical characteristics for using the nuclear systems on non electric power applications with an economical efficiency. What are the markets for these products? What are the strategical challenges to favor the development of non electric power applications of the nuclear energy? (A.L.B.)

  16. Investments in the Brazilian electric sector; Os investimentos no setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Mello, Arthur Octavio Pinto Barreto de

    2008-05-15

    This work covers the investments in the Brazilian electric sector. Initially it describes the investments since 1879 in order to give a better understanding of the historical return obtained by investors, associated risks, investors' profile and investment's funding. Then some financial considerations related to new investments analysis are presented, emphasizing: the discounted cash flow theory, the equity return, the business risks and the characteristics of the main project accounts. Additionally, a hydroelectric case study is presented, in which the effect at the energy price of uncertainties in cost's projections, regional tax benefits, tax alternatives, and others are stressed. (author)

  17. Electric power generation the changing dimensions

    CERN Document Server

    Tagare, D M

    2011-01-01

    "This book offers an analytical overview of established electric generation processes, along with the present status & improvements for meeting the strains of reconstruction. These old methods are hydro-electric, thermal & nuclear power production. The book covers climatic constraints; their affects and how they are shaping thermal production. The book also covers the main renewable energy sources, wind and PV cells and the hybrids arising out of these. It covers distributed generation which already has a large presence is now being joined by wind & PV energies. It covers their accommodation in the present system. It introduces energy stores for electricity; when they burst upon the scene in full strength are expected to revolutionize electricity production. In all the subjects covered, there are references to power marketing & how it is shaping production. There will also be a reference chapter on how the power market works"--Provided by publisher.

  18. Optimal control applications in electric power systems

    CERN Document Server

    Christensen, G S; Soliman, S A

    1987-01-01

    Significant advances in the field of optimal control have been made over the past few decades. These advances have been well documented in numerous fine publications, and have motivated a number of innovations in electric power system engineering, but they have not yet been collected in book form. Our purpose in writing this book is to provide a description of some of the applications of optimal control techniques to practical power system problems. The book is designed for advanced undergraduate courses in electric power systems, as well as graduate courses in electrical engineering, applied mathematics, and industrial engineering. It is also intended as a self-study aid for practicing personnel involved in the planning and operation of electric power systems for utilities, manufacturers, and consulting and government regulatory agencies. The book consists of seven chapters. It begins with an introductory chapter that briefly reviews the history of optimal control and its power system applications and also p...

  19. Incentive policies for promoting wind power production in Brazil: Scenarios for the Alternative Energy Sources Incentive Program (PROINFA) under the New Brazilian electric power sector regulation

    International Nuclear Information System (INIS)

    Dutra, Ricardo Marques; Szklo, Alexandre Salem

    2008-01-01

    The Alternative Energy Sources Incentive Program (PROINFA) was designed in 2002 to stimulate the electricity generation from three energy sources (wind, biomass and small-scale hydro) in Brazil. The Program was divided into two phases. The first one uses feed-in tariffs for promoting the development of 3300 MW. The second one that was originally based on feed-in tariffs was modified in 2003, in order to be based on biddings for renewables. These biddings are capped to limit their impact on the final electricity tariff. Due to this bound, the highest-cost power option promoted by PROINFA (wind power generation) might have development problems. Simulating different scenarios for the biddings, it was verified that the only way to reach the original goal set by PROINFA (10% of the annual electricity consumption provided by alternative sources up to 2020) and, simultaneously, not overcome the bidding bound is to promote biomass-fired power generation alone, during the Program's second phase. However, this action contradicts one of the targets of the Program, which is to diversify the energy matrix. An alternative option could be biddings for renewables according to specific criteria (complementarities, industrial and technological development and cost), based not only on their cost-effectiveness. (author)

  20. Are the electric plans following the Brazilian energy policy?

    International Nuclear Information System (INIS)

    Metri, Paulo

    2013-01-01

    The first article of Brazilian law 9.478, enacted in 1997, provides the main objectives for the country's energy policy. After this law came into force, all public and private investments bringing about increase in energy offers should comply with these objectives. The 1990's saw privatizations of major distribution companies as well as of some generation companies, stretching even into the 2000's. At the same time, the basic rules for the electric sector were also modified. The Government maintained its planning role in this sector. Law 10.847, enacted in 2004, sets forth the guidelines for the electric sector's activities. Since then, many rounds of bids have been conducted in order to meet increasing needs of generation and transmission. Now, almost ten years after the introduction of the new rules, some electric-generating plants and transmission lines have been built or are under construction. There is doubt whether these rounds will suffice in satisfying the original goals. Today, nuclear energy is produced exclusively by the State, and it seems that it will remain so for years to come. It is usual to hear that the nuclear energy does not participate in the natural competition existing in the planning stage, because this source is a State imposition. Nuclear plants are built in a pace that guarantees the maintenance of nuclear technology in the country. But nuclear energy has not been banned from electric planning. This planning must encompass all possible judgment criteria, so that the positive aspects of nuclear energy may also stand out. In this way, the objectives established by Law 9,478 may not comprise best judgment criteria. If the planning shows nuclear energy as an attractive alternative, it should not then be adopted as an obligation. (author)

  1. Electrical power cable engineering

    CERN Document Server

    Thue, William A

    2011-01-01

    Fully updated, Electrical Power Cable Engineering, Third Edition again concentrates on the remarkably complex design, application, and preparation methods required to terminate and splice cables. This latest addition to the CRC Press Power Engineering series covers cutting-edge methods for design, manufacture, installation, operation, and maintenance of reliable power cable systems. It is based largely on feedback from experienced university lecturers who have taught courses on these very concepts.The book emphasizes methods to optimize vital design and installation of power cables used in the

  2. Electric power monthly, April 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-07

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  3. Electric power monthly, May 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-25

    The Electric Power Monthly (EPM) is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  4. Electric power: liberalization in half-measure

    International Nuclear Information System (INIS)

    Pradel, P.

    1996-01-01

    The European directive about the electric power liberalization concerns only big consumers. These manufacturers have privileged relations with E.D.F. for long years with a very attractive price for the kilowatt hour. The change should not be very important, only more transparency in accounts and change in tariffs of power transmission: for example, a small electric power producer will be authorized to contest the buying price that E.D.F. imposes to him to transport the energy he produces. (N.C.)

  5. Monitoring and analyzing features of electrical power quality system performance

    OpenAIRE

    Genci Sharko; Nike Shanku

    2010-01-01

    Power quality is a set of boundaries that allows electrical systems to function in their intended manner without significant loss of performance or life. The term is used to describe electric power that drives an electrical load and the load's ability to function properly with that electric power. Without the proper quality of the power, an electrical device may malfunction, fail prematurely or not operate at all. There are many reasons why the electric power can be of poor quality and many m...

  6. Studies in market-based electric power trade and regulation

    International Nuclear Information System (INIS)

    Hope, Einar

    2000-01-01

    This is a compilation of articles written by the author during the last fifteen years. Most of the articles are related to the reform of the Norwegian electric power market. This reform led to the Energy Act of 1990 and to the subsequent development of the power markets. Some of the sections are in Norwegian, some in English. The sections discuss (1) Markets for electricity trade in Norway, (2) Economic incentives and public firm behaviour, (3) Market alternatives to the present forms of occasional power trade, (4) Socio-economic considerations about electricity pricing, (5) Scenarios for market based power trade in Norway, (6) Markets for electricity: economic reform of the Norwegian electricity industry, (7) The Norwegian power market, (8) A common Nordic energy market?, (9) Organization of supply markets for natural gas in Europe, (10) The extent of the central grid, (11) Optimum regulation of grid monopolies in the power trade, (12) Power markets and competition policy, (13) Deregulation of the Norwegian power sector, (14) designing a market based system for the Icelandic electricity industry and (15) regulation regimes for the power sector

  7. Model Design on Emergency Power Supply of Electric Vehicle

    Directory of Open Access Journals (Sweden)

    Yuanliang Zhao

    2017-01-01

    Full Text Available According to the mobile storage characteristic of electric vehicles, an emergency power supply model about the electric vehicles is presented through analyzing its storage characteristic. The model can ensure important consumer loss minimization during power failure or emergency and can make electric vehicles cost minimization about running, scheduling, and vindicating. In view of the random dispersion feature in one area, an emergency power supply scheme using the electric vehicles is designed based on the K-means algorithm. The purpose is to improve the electric vehicles initiative gathering ability and reduce the electric vehicles gathering time. The study can reduce the number of other emergency power supply equipment and improve the urban electricity reliability.

  8. Propulsion element requirements using electrical power system unscheduled power

    Science.gov (United States)

    Zimmermann, Frank; Hodge, Kathy

    1989-01-01

    The suitability of using the electrical energy from the Space Station's Electrical Power System (EPS) during the periods of peak solar insolation which is currently not specifically allocated (unscheduled power) to produce propulsion propellants, gaseous hydrogen, and oxygen by electrolyzing water is investigated. Reboost propellant requirements are emphasized, but the results are more generally relevant because the balance of recurring propellant requirements are an order of magnitude smaller and the nonrecurring requirements are not significant on an average basis.

  9. Manned spacecraft electrical power systems

    Science.gov (United States)

    Simon, William E.; Nored, Donald L.

    1987-01-01

    A brief history of the development of electrical power systems from the earliest manned space flights illustrates a natural trend toward a growth of electrical power requirements and operational lifetimes with each succeeding space program. A review of the design philosophy and development experience associated with the Space Shuttle Orbiter electrical power system is presented, beginning with the state of technology at the conclusion of the Apollo Program. A discussion of prototype, verification, and qualification hardware is included, and several design improvements following the first Orbiter flight are described. The problems encountered, the scientific and engineering approaches used to meet the technological challenges, and the results obtained are stressed. Major technology barriers and their solutions are discussed, and a brief Orbiter flight experience summary of early Space Shuttle missions is included. A description of projected Space Station power requirements and candidate system concepts which could satisfy these anticipated needs is presented. Significant challenges different from Space Shuttle, innovative concepts and ideas, and station growth considerations are discussed. The Phase B Advanced Development hardware program is summarized and a status of Phase B preliminary tradeoff studies is presented.

  10. Brazilian experience in electricity auctions: Comparing outcomes from new and old energy auctions as well as the application of the hybrid Anglo-Dutch design

    International Nuclear Information System (INIS)

    Rego, Erik Eduardo; Parente, Virginia

    2013-01-01

    Since 2004, the Government of Brazil (GoB) has acted as an intermediary between distribution and generator companies in the energy procurement sector. The GoB procures energy from generator companies through auctions of long-term energy contracts. After an auction, the winning generator companies sign contracts directly with distribution companies. In particular, the GoB runs two different auctions: one for energy from existing power plants (i.e., old energy) and another for energy from power plants that have not yet been built (i.e., new energy). This paper describes these auctions and compares the outcomes from the old and new energy auctions from 2004 to 2010 using final auction prices. The Brazilian case is particularly interesting, not only because energy is predominantly supplied by hydropower plants but also because new energy auctions reach prices below those for old energy. Therefore, it is likely that it is not necessary to run the two different energy auctions. As a secondary objective, this article analyze whether the Anglo-Dutch hybrid auction model is a better design for electricity procurement in Brazil. - Highlights: ► We analyze the outcomes from the Brazilian old and new energy auctions. ► We evaluate the Anglo-Dutch auction design. ► Outcomes from both kind of auctions reveal that the prices are statistically similar. ► One kind of auction increase competition and minimize Eletrobras' market power

  11. Power electronics and electric machinery challenges and opportunities in electric and hybrid vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Adams, D.J.; Hsu, J.S.; Young, R.W. [Oak Ridge National Lab., TN (United States); Peng, F.Z. [Univ. of Tennessee, Knoxville, TN (United States)

    1997-06-01

    The development of power electronics and electric machinery presents significant challenges to the advancement of electric and hybrid vehicles. Electronic components and systems development for vehicle applications have progressed from the replacement of mechanical systems to the availability of features that can only be realized through interacting electronic controls and devices. Near-term applications of power electronics in vehicles will enable integrated powertrain controls, integrated chassis system controls, and navigation and communications systems. Future applications of optimized electric machinery will enable highly efficient and lightweight systems. This paper will explore the areas where research and development is required to ensure the continued development of power electronics and electric machines to meet the rigorous demands of automotive applications. Additionally, recent advances in automotive related power electronics and electric machinery at Oak Ridge National Laboratory will be explained. 3 refs., 5 figs.

  12. Meeting the Pacific Rim's changing electric power needs

    International Nuclear Information System (INIS)

    Hammons, T.J.

    1994-01-01

    This article describes the presentations made at the 1994 Asian Electric Conference. The topics discussed in detail include a successfully implemented strategy for building power projects, a review of the reforms taking place as Australia moves toward a competitive national electricity market by July 1995, the reorganizing of Japan's electric power market, and the electricity reform program in Pakistan

  13. Perspectives of the electric power industry amid the transforming global power generation markets

    Science.gov (United States)

    Makarov, A. A.; Mitrova, T. A.; Veselov, F. V.; Galkina, A. A.; Kulagin, V. A.

    2017-10-01

    A scenario-based prognosis of the evolution of global power generation markets until 2040, which was developed using the Scaner model-and-information complex, was given. The perspective development of fuel markets, vital for the power generation industry, was considered, and an attempt to predict the demand, production, and prices of oil, gas, coal, and noncarbon resources across various regions of the world was made. The anticipated decline in the growth of the global demand for fossil fuels and their sufficiency with relatively low extraction expenses will maintain the fuel prices (the data hereinafter are given as per 2014 prices) lower than their peak values in 2012. The outrunning growth of demand for electric power is shown in comparison with other power resources by regions and large countries in the world. The conditions of interfuel competition in the electric power industry considering the changes in anticipated fuel prices and cost indicators for various power generation technologies were studied. For this purpose, the ratios of discounted costs of electric power production by new gas and coal TPPs and wind and solar power plants were estimated. It was proven that accounting the system effects (operation modes, necessary duplicating and reserving the power of electric power plants using renewable energy sources) notably reduces the competitiveness of the renewable power industry and is not always compensated by the expected lowering of its capital intensity and growth of fuel for TPPs. However, even with a moderate (in relation to other prognoses) growth of the role of power plants using renewable energy sources, they will triple electric power production. In this context, thermal power plants will preserve their leadership covering up to 60% of the global electric power production, approximately half using gas.

  14. Topical problems of the German electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    Boeck, H [Stadtwerke Hannover A.G. (Germany, F.R.); Worm, N [Hannover-Braunschweigische Stromversorgungs-A.G., Hannover (Germany, F.R.); Brohmeyer, M [Schleswig-Holsteinische Stromversorgungs A.G., Rendsburg (Germany, F.R.). Abt. Anwendungstechnik und Beratung; Deuster, G [Energieversorgung Oberhausen A.G. (Germany, F.R.); Heitzer, H; Holzer, J [Bayernwerk A.G., Muenchen (Germany, F.R.); Deparade, K [Verband der Energie-Abnehmer e.V., Hannover (Germany, F.R.); Marnet, C [Stadtwerke Duesseldorf A.G. (Germany, F.R.); Oberlack, H W [Hamburgische Electricitaets-Werke A.G. (Germany, F.R.); Segatz, U [Preussische Elektrizitaets-A.G. (Preussenelektra), Hannover (Germany, F.R.)

    1978-06-01

    On the occasion of the general meeting of the VDE high-ranking personalities of the German Power Supply Industry were interviewed on current affairs. The following subjects were discussed: (1) problems involved in energy policy; (2) energy problems due to newly formed regions; (3) utilization of electric power in agriculture; (4) development prospects of district heating; (5) problems of power generation far from coal districts; (6) rationalization in the commercial sector; (7) opportunities and limits of industrial combined heat and power generation; (8) environmental protection and electric power supply; (9) possible utilization of imported coal; and (10). assuring the primary energy basis for electric power supply.

  15. Chaos in power: Pakistan's electricity crisis

    International Nuclear Information System (INIS)

    Kessides, Ioannis N.

    2013-01-01

    Pakistan is facing a severe electricity crisis due to a persistent and widening gap between demand and available system generating capacity. The worsening of power shortages has become a major political issue, reflecting the hardships for individuals and businesses. It threatens to undermine the credibility and legitimacy of government and to further stress the social fabric of the country. The power crisis did not emerge suddenly. It is the direct result of imprudent and reckless energy policies over the last three decades. These policies have impeded the development of cheap and abundant domestic energy sources. They have also resulted in very inefficient fuel-mix choices, compromising energy and economic security. Pakistan's energy bankruptcy is ultimately due to massive institutional and governance failure. This paper analyzes the problems confronting Pakistan's electricity sector and identifies the key elements of a potential policy response to address the country's severe power crisis. - Highlights: ► We analyze the structure, conduct, and performance of Pakistan's electricity sector. ► The causes and economic impacts of Pakistan's electricity shortages are analyzed. ► We identify the potential policy response to the power crisis

  16. Electric Vehicle Integration into Modern Power Networks

    DEFF Research Database (Denmark)

    software tools to assess the impacts resulting from the electric vehicles deployment on the steady state and dynamic operation of electricity grids, identifies strategies to mitigate them and the possibility to support simultaneously large-scale integration of renewable energy sources. New business models......Electric Vehicle Integration into Modern Power Networks provides coverage of the challenges and opportunities posed by the progressive integration of electric drive vehicles. Starting with a thorough overview of the current electric vehicle and battery state-of-the-art, this work describes dynamic...... and control management architectures, as well as the communication infrastructure required to integrate electric vehicles as active demand are presented. Finally, regulatory issues of integrating electric vehicles into modern power systems are addressed. Inspired by two courses held under the EES...

  17. Electric Vehicle Integration into Modern Power Networks

    DEFF Research Database (Denmark)

    Electric Vehicle Integration into Modern Power Networks provides coverage of the challenges and opportunities posed by the progressive integration of electric drive vehicles. Starting with a thorough overview of the current electric vehicle and battery state-of-the-art, this work describes dynamic...... software tools to assess the impacts resulting from the electric vehicles deployment on the steady state and dynamic operation of electricity grids, identifies strategies to mitigate them and the possibility to support simultaneously large-scale integration of renewable energy sources. New business models...... and control management architectures, as well as the communication infrastructure required to integrate electric vehicles as active demand are presented. Finally, regulatory issues of integrating electric vehicles into modern power systems are addressed. Inspired by two courses held under the EES...

  18. Nuclear power within liberalised electricity markets

    International Nuclear Information System (INIS)

    Kidd, Stephen W.

    2002-01-01

    Competition between various methods of generating electricity in liberalised markets means that all power plants must be cost-effective. The price of electricity from nuclear power includes all waste disposal and decommissioning costs, unlike other electricity generating technologies. Most existing nuclear power plants are likely to prosper under electricity liberalization. Many will receive operating life extensions and be able to compete in the electricity market for many years to come. Investment costs are particularly heavy for nuclear plants. Capital expenditure appraisal methodologies mean that such plants suffer financial disadvantages in times of high interest rates. Low and stable fuel costs are the prime advantage of nuclear plants against other sources of generating electricity. There will be significant demand for new generating capacity, both incremental and replacement, in the next 20 years. Under present conditions, where there is access to a stable and cheap supply of piped gas, nuclear and coal plants find it difficult to compete against gas-fired plants. The nuclear industry is addressing the need for new reactor designs, offering significant capital and operating cost reductions from the previous generation of reactors. This development and the need for carbon abatement on a worldwide basis offers nuclear plants a further economic advantage against alternative technologies. (author)

  19. ELMO model predicts the price of electric power

    International Nuclear Information System (INIS)

    Antila, H.

    2001-01-01

    Electrowatt-Ekono has developed a new model, by which it is possible to make long-term prognoses on the development of electricity prices in the Nordic Countries. The ELMO model can be used as an analysis service of the electricity markets and estimation of the profitability of long-term power distribution contracts with different scenarios. It can also be applied for calculation of technical and economical fundamentals for new power plants, and for estimation of the effects of different taxation models on the emissions of power generation. The model describes the whole power generation system, the power and heat consumption and transmission. The Finnish power generation system is based on the Electrowatt-Ekono's boiler database by combining different data elements. Calculation is based on the assumption that the Nordic power generation system is used optimally, and that the production costs are minimised. In practise the effectively operated electricity markets ensure the optimal use of the production system. The market area to be described consists of Finland and Sweden. The spot prices have long been the same. Norway has been treated as a separate market area. The most potential power generation system, the power consumption and the power transmission system are presumed for the target year during a normal rainfall situation. The basic scenario is calculated on the basis of the preconditional data. The calculation is carried out on hourly basis, which enables the estimation of the price variation of electric power between different times during the day and seasons. The system optimises the power generation on the basis of electricity and heat consumption curves and fuel prices. The result is an hourly limit price for electric power. Estimates are presented as standard form reports. Prices are presented as average annuals, in the seasonal base, and in hourly or daily basis for different seasons

  20. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  1. Concerning the debate on electric-powered-vehicle emissions

    International Nuclear Information System (INIS)

    Sporckmann, B.

    1994-01-01

    The fact that electric-powered vehicles do not emit pollutants locally is obvious and must be considered as the main motive for their use. The global air pollution situation can only be of secondary importance because within the foreseeable future emissions linked to the use of electric-powered vehicles will remain within the variation width of power generation emissions that is not to be influenced. All the same, it is indispensable to consider the global situation. The author compares electric-powered vehicles with conventional ones by referring to the power generation of all federal German states. (orig.) [de

  2. The place of the large electric power consumers in the electric power liberalised market

    International Nuclear Information System (INIS)

    Pavlov, Risto; Chogelja, Goran

    2001-01-01

    In this paper the basic rules of the EC Directive 96/92 of the EU are given. The implementation of the Directive into the Macedonian legislation is analysed. Also, the Directive's influence on the both large electric power consumers and the Macedonian Power System itself is presented

  3. TOPEX electrical power system

    Science.gov (United States)

    Chetty, P. R. K.; Roufberg, Lew; Costogue, Ernest

    1991-01-01

    The TOPEX mission requirements which impact the power requirements and analyses are presented. A description of the electrical power system (EPS), including energy management and battery charging methods that were conceived and developed to meet the identified satellite requirements, is included. Analysis of the TOPEX EPS confirms that all of its electrical performance and reliability requirements have been met. The TOPEX EPS employs the flight-proven modular power system (MPS) which is part of the Multimission Modular Spacecraft and provides high reliability, abbreviated development effort and schedule, and low cost. An energy balance equation, unique to TOPEX, has been derived to confirm that the batteries will be completely recharged following each eclipse, under worst-case conditions. TOPEX uses three NASA Standard 50AH Ni-Cd batteries, each with 22 cells in series. The MPS contains battery charge control and protection based on measurements of battery currents, voltages, temperatures, and computed depth-of-discharge. In case of impending battery depletion, the MPS automatically implements load shedding.

  4. Electric Power Supply Chain Management Addressing Climate Change

    DEFF Research Database (Denmark)

    Wang, Xiao-Hui; Cong, Ronggang

    2012-01-01

    Supply chain management played a critical role in the electric power industrial chain optimization. The purpose of this paper was to review a sample of the literature relating to supply chain management and its possible applications in electricity power system, especially in the context of climate...... change. The study compared the difference between electric power supply chain management and traditional supply chain management. Furthermore, some possible research topics are addressed. The aim of this paper was to promote the application of supply chain management in the China electricity sector...

  5. Hedging electricity price volatility using nuclear power

    International Nuclear Information System (INIS)

    Mari, Carlo

    2014-01-01

    Highlights: • Nuclear power is an important asset to reduce the volatility of electricity prices. • Unpredictability of fossil fuels and carbon prices makes power prices very volatile. • The dynamics of fossil fuels and carbon prices is described by Brownian motions. • LCOE values, volatilities and correlations are obtained via Monte Carlo simulations. • Optimal portfolios of generating technologies are get using a mean–variance approach. - Abstract: The analysis presented in this paper aims to put in some evidence the role of nuclear power as hedging asset against the volatility of electricity prices. The unpredictability of natural gas and coal market prices as well as the uncertainty in environmental policies may affect power generating costs, thus enhancing volatility in electricity market prices. The nuclear option, allowing to generate electricity without carbon emissions, offers the possibility to reduce the volatility of electricity prices through optimal diversification of power generating technologies. This paper provides a methodological scheme to plan well diversified “portfolios” of generating capacity that minimize the electricity price risk induced by random movements of fossil fuels market prices and by unpredictable fluctuations of carbon credits prices. The analysis is developed within a stochastic environment in which the dynamics of fuel prices as well as the dynamics of carbon credits prices is assumed to evolve in time according to well defined Brownian processes. Starting from market data and using Monte Carlo techniques to simulate generating cost values, the hedging argument is developed by selecting optimal portfolio of power generating technologies using a mean–variance approach

  6. Design of reactive power procurement in deregulated electricity market

    African Journals Online (AJOL)

    Reactive power management is different in the deregulated electricity market of various countries. In this paper, a novel reactive power procurement model is proposed, which ensure secure and reliable operation of deregulated electricity market. Various issues of reactive power management in the deregulated electricity ...

  7. Electric power monthly, September 1990. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-17

    The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

  8. Organization and development of the Brazilian nuclear program

    International Nuclear Information System (INIS)

    Pinto, C. Syllus M.; Alves, R. Nazare; Lepecki, W.; Costa, H.M. da; Grinberg, M.; Grimberg, M.

    1977-01-01

    The paper presents the Brazilian Nuclear Energy Program: its development until the present stage, as well as the organizations and the distribution of responsibilities involved in its execution at the present time. The nuclear power policy is established at the Presidency of the Republic and is planned, executed and controlled through the Ministry of Mines and Energy. Directly subject to the Ministry is the Brazilian Nuclear Energy Commission (CNEN), which has regulatory, standardization, licensing, planning and surveillance functions. The nuclear fundamental research and manpower formation are also under CNEN responsibility. Also subject to the Ministry are two companies responsible for the execution of the Programme: the Centrais Eletricas Brasileiras S.A. - ELETROBRAS, which advises on the granting of permits for the construction and operation of nuclear power plants, and the Empresas Nucleares Brasileiras S.A. - NUCLEBRAS, which holds the monopoly of the nuclear fuel cycle in the country, designs and builds nuclear power plants and provides assistance to the electric utilities as well as promotes the participation of the Brazilian industry in the nuclear field. Besides describing the new distribution of regulatory functions given by law to the CNEN, this paper gives special emphasis to the large industrial complex which is in the process of being established with the setting-up of the many NUCLEBRAS subsidiaries in joint-venture with German firms in the nuclear field, as a consequence of the Industrial Cooperation between Brazil and the Federal Republic of Germany in the Field of the Peaceful Uses of Nuclear Energy signed between the two countries on June 27, 1975. The programs for these subsidiaries are presented and their participation in the Brazilian Nuclear Energy Programme is discussed. The technology transfer aspects of the industrial activities are also discussed, based on the Government's policy on the subject [es

  9. Power Sales to Electric Utilities

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-02-01

    The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of

  10. Distributed control of deregulated electrical power networks

    NARCIS (Netherlands)

    Hermans, R.M.

    2012-01-01

    A prerequisite for reliable operation of electrical power networks is that supply and demand are balanced at all time, as efficient ways for storing large amounts of electrical energy are scarce. Balancing is challenging, however, due to the power system's dimensions and complexity, the low

  11. DISTRIBUTED ELECTRICAL POWER PRODUCTION SYSTEM AND METHOD OF CONTROL THEREOF

    DEFF Research Database (Denmark)

    2010-01-01

    The present invention relates to a distributed electrical power production system wherein two or more electrical power units comprise respective sets of power supply attributes. Each set of power supply attributes is associated with a dynamic operating state of a particular electrical power unit....

  12. Sectoral panorama: the electric power sector in Europe

    International Nuclear Information System (INIS)

    Mons, L.

    2003-10-01

    This study takes stock on the main european markets to help the electric power companies in their decisions and investments. The first part presents the electric power sector structure in Europe. The second part is devoted to the market evolution for the different european markets (german, french, british, italian and spanish) with an analysis of the retail prices, the competition and the evolution perspectives. The third part presents the highlights in the electric power sector between 2001 and the middle of 2003. The enterprises management and strategies are presented in the fourth part. In the last part the document analyzes the financial performances of the sector and the electric power companies. (A.L.B.)

  13. Electric vehicles in Danish power system with large penetration of wind power

    DEFF Research Database (Denmark)

    Yang, Lihui; Xu, Zhao; Østergaard, Jacob

    2011-01-01

    Electric vehicles (EVs) provide a unique opportunity for reducing the CO2 emissions from the transport sector. At the same time, EVs have the potential to play an important role in the economical and reliable operation of an electricity system with high penetration of renewable energy. An analysi......). The managing structure of V2G adopting virtual power plant (VPP) technology is proposed. © 2011 State Grid Electric Power Research Institute Press....... is made of the potential for using EVs in Denmark, and the benefits of the electric power system with high wind power generation by intelligent charging and discharging of EVs are enumerated. Based on the analysis, important technological gaps are identified, and the corresponding research and development...... initiatives of the recently established EDISON program are described. Moreover, the latest development of the EDISON program is treated, that is, EDISON as a research consortium to design a new model for the Danish power system with high penetration of wind power and EVs with vehicle to grid (V2G...

  14. Electric power industry restructuring and ROE: The case of Korea Electric Power Corporation

    International Nuclear Information System (INIS)

    Won, Gu-Hwan

    2007-01-01

    Korea's electric power industry was previously run by Korea Electric Power Corporation (KEPCO) in a natural monopoly-type structure. As economy of scale was waning in influence and management effectiveness began to increase in importance, KEPCO was divided into six subsidiaries and faced competition beginning in April 2001. This study evaluates the restructuring process for Korea's power industry and analyzes the financial outcomes based on return on equity (ROE). The results show that the ROE ratio increased. In the analysis period (1993-2004), the financial ratio showed a better performance than that before restructuring. However, productivity ratios such as productivity of capital (or gross value added to total assets) and gross value added to property, plant, and equipment decreased compared to the situation before restructuring. It is believed that the results were due to the increased financial leverage of KEPCO. For this reason, KEPCO should make further efforts to manage its debt in a systematic way

  15. Power quality in power systems and electrical machines

    CERN Document Server

    Fuchs, Ewald

    2015-01-01

    The second edition of this must-have reference covers power quality issues in four parts, including new discussions related to renewable energy systems. The first part of the book provides background on causes, effects, standards, and measurements of power quality and harmonics. Once the basics are established the authors move on to harmonic modeling of power systems, including components and apparatus (electric machines). The final part of the book is devoted to power quality mitigation approaches and devices, and the fourth part extends the analysis to power quality solutions for renewable

  16. Electric power monthly, June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  17. Electric power monthly, August 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-24

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  18. Electric power monthly, July 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-29

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended.

  19. Electric power monthly, November 1994

    International Nuclear Information System (INIS)

    1994-11-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended

  20. Electric power in Canada, 1982

    International Nuclear Information System (INIS)

    1983-01-01

    This annual review surveys Canadian electrical power production and consumption, exports and imports, and developments in the fields of energy policy, electric space heating, and alternate energy sources. Total Canadian capacity at Dec. 31 1982 was 84 777 MW, 6 280 MW from nuclear sources. Of 1 469 MW capacity added during 1982, 680 MW were nuclear. The demand for electricity dropped to 344 083 GWh in 1982 from 346 333 GWh in 1981

  1. Supply adequacy in electricity markets based on hydro systems-the Brazilian case

    International Nuclear Information System (INIS)

    Luiz da Silva, Edson

    2006-01-01

    This article examines the practical perspective for introducing the deregulation model in systems with a strong predominance of hydroelectric generation, such as the Brazilian electricity system. In order to do this, the article describes the process of establishing short-term prices in systems with such characteristics, concluding that this economic signal is inefficient for stimulating a sustained generation expansion. As a result of this analysis, the article proposes, as a regulatory policy, a competitive process of energy contracting that favors the making of decisions with long-term horizons, ensuring the adequacy of supply, and, additionally, permitting a satisfactory management of market risk by generation and distribution companies. (author)

  2. Investments in the Brazilian electric sector; Os investimentos no setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Mello, Arthur Octavio Pinto Barreto de

    2008-05-15

    This work covers the investments in the Brazilian electric sector. Initially it describes the investments since 1879 in order to give a better understanding of the historical return obtained by investors, associated risks, investors' profile and investment's funding. Then some financial considerations related to new investments analysis are presented, emphasizing: the discounted cash flow theory, the equity return, the business risks and the characteristics of the main project accounts. Additionally, a hydroelectric case study is presented, in which the effect at the energy price of uncertainties in cost's projections, regional tax benefits, tax alternatives, and others are stressed. (author)

  3. Modeling and Nonlinear Control of Electric Power Stage in Hybrid Electric Vehicle

    DEFF Research Database (Denmark)

    Tahri, A.; El Fadil, H.; Guerrero, Josep M.

    2014-01-01

    This paper deals with the problem of modeling and controlling the electric power stage of hybrid electric vehicle. The controlled system consists of a fuel cell (FC) as a main source, a supercapacitor as an auxiliary source, two DC-DC power converters, an inverter and a traction induction motor...

  4. The Brazilian energy crisis and a study to support building efficiency legislation

    Energy Technology Data Exchange (ETDEWEB)

    Rosa, L.P. [Federal University of Rio de Janeiro (Brazil). School of Engineering; Lomardo, L.L.B. [Fluminense Federal University and Researcher of COPPE, Rio de Janeiro (Brazil). Dept. of Architecture

    2004-02-01

    Brazil has gone through an important electricity generation crisis in 2001, but the country does not have as yet a legislation to improve building energy efficiency. The energy efficiency of Brazilian buildings can well be improved, as it was shown during the energy-rationing period in 2001. This efficiency increase could usher in gains in quality for indoor environments, as well as lower investments in power generation facilities, including the emission of gases into the atmosphere, flooding arable land for reservoirs, etc. The current work briefly demonstrates the lack of planning that caused the electricity crisis, some results of multi-building studies and simulations of an existing office building of Rio de Janeiro. In this parametric case-study, we have simulated variations of the window-wall ratio (WWR) with different glasses and interior shade, using the natural light, aspects deemed to be of the utmost importance for a future Brazilian building energy efficiency legislation. The need of such legislation has been much increased as a result of the energy generation crisis and its consequences. To take advantage of the problems, in order to improve the quality of the Brazilians buildings, is one of our objectives. (author)

  5. Safety assessment of emergency electric power systems for nuclear power plants

    International Nuclear Information System (INIS)

    1986-09-01

    This paper is intended to assist the safety assessor within a regulatory body, or one working as a consultant, in assessing a given design of the Emergency Electrical Power System. Those non-electric power systems which may be used in a plant design to serve as emergency energy sources are addressed only in their general safety aspects. The paper thus relates closely to Safety Series 50-SG-D7 ''Emergency Power Systems at Nuclear Power Plants'' (1982), as far as it addresses emergency electric power systems. Several aspects are dealt with: the information the assessor may expect from the applicant to fulfill his task of safety review; the main questions the reviewer has to answer in order to determine the compliance with requirements of the NUSS documents; the national or international standards which give further guidance on a certain system or piece of equipment; comments and suggestions which may help to judge a variety of possible solutions

  6. Outline of electric power facility plan in fiscal year 1988

    International Nuclear Information System (INIS)

    1988-01-01

    As to the electric power facility plan in fiscal year 1988, 15 designated electric power enterprises made the notification to the Minister of International Trade and Industry in March, 1988. This outline of the facility plan summarized the plans of 66 enterprises in total, including the plans of municipally operated, joint thermal power and other enterprises in addition to the above 15. In order to ensure the stable supply of electric power, the Ministry of International Trade and Industry considers that it is indispensable to purposefully develop electric power sources and the facilities for distribution along this facility plan. The forecast for fiscal year 1997 is : total electric power demand 778.2 billion kWh, maximum power demand 151.21 million kW, and yearly load factor 56.9 %. This is equivalent to the yearly growth of 2.4 %. In fiscal year 1988, it is planned to present 29 plants of 2760 MW to the Power Source Development Coordination Council. The breakdown is : hydroelectricity 140 MW, thermal power 2010 MW, and nuclear power 610 MW. The Ministry guides electric power enterprises so as to realize the diversification of electric power sources. Also the increase of transmission and transformation facilities, the plan of equipment investment and others are reported. (Kako, I.)

  7. Progress of innovation of electrical power technology in FY2013

    International Nuclear Information System (INIS)

    Mayumi, Akihiko; Tanaka, Masanori; Yamaguchi, Hiroshi

    2014-01-01

    The following is the description of technical innovations at 12 companies including Tokyo Electric Power Company, Chubu Electric Power Company, and Japan Atomic Power Company. Tokyo Electric Power Company presented (1) the developments of a wet-type air decontaminating apparatus for inside/outside of power plant, (2) a robot to be used for field investigation at the Fukushima Daiichi nuclear power plant, (3) a visualization technology using laser for detection, and (4) removal of debris at the power plant. Chubu Electric Power Company presented application of a flap gate to the opening on exterior wall of building as a countermeasure against tsunami at the Hamaoka nuclear power plant. Hokuriku Electric Power Company presented a nuclear reactor operation training simulator for full-scope operation training for the Shika nuclear power station. Chugoku Electric Power Company presented their efforts in implementing a predictive monitoring system at the Shimane Nuclear Power Station. Shikoku Electric Power Company presented the installation of a weir with a flap gate to the interior of seawater pit as a countermeasure against tsunami. Japan Atomic Power Company presented an impact assessment method of fallout during transportation of materials caused by nuclear reactor accident, design and development of a square-type shielding container for radioactive wastes, a strength test on concrete materials for the safety design of Tsuruga Power Station Units 3 and 4, decommissioning of nuclear power plant, and research and development of the fast breeder reactor. (S.Y.)

  8. Corrosion control in electric power plants

    International Nuclear Information System (INIS)

    Syrett, B.C.

    1992-01-01

    This paper reports that corrosion of components in power plants costs the US electric power utility industry billions of dollars each year. Through the Electric Power Research Institute's (EPRI) research and development, several approaches have been developed to reduce these huge costs. They include improved materials selection procedures, coatings, cathodic protection, inhibitors, removal of aggressive species from the environment, and on-line corrosion monitoring. In addition, as part of an on-going technology transfer effort, EPRI is developing databases and expert systems that will help utilities obtain corrosion information and guide them in materials selection and failure analysis

  9. Annual Report 1999. Electric power in Sweden

    International Nuclear Information System (INIS)

    2000-07-01

    Barsebaeck 1 was closed on 30 November 1999. Barsebaeck's output of approximately 4 TWh per year will primarily be replaced by imports from coal-fired plants in Denmark and Germany. During the year, the closure of Swedish fossil-fired condensing power stations continued. With that, over 3,000 MW of peak-load power has been shut down during recent years. Consequently, situations entailing shortages of power can arise. On the deregulated electricity market, it is only the system operators that have a satisfactory overview of the overall electricity balance. The Swedish Power Association has thus lobbied the government as regards the need to elucidate Svenska Kraftnaet's responsibility. In a governmental decision from December, Svenska Kraftnaet was given the task of, among other things, monitoring the available capacity during peak loads and developing market instruments that can contribute to safeguarding the availability of power during peak loads. Svenska Kraftnaet has acquired gas turbines with a combined output power of 400 MW from Vattenfall. In order to cover the remaining requirement for rapid disruption reserves, Svenska Kraftnaet also has agreements with several power producers regarding a further 800 MW of gas turbine capacity. One further possibility lies in agreements with industry regarding the disconnection of consumption during times of peak loading. On 1 January 2000, the nuclear power tax was increased by SEK 0.005 per kWh to SEK 0.027 per kWh. This means that the nuclear power companies pay approximately SEK 1,800 MSEK per year in fiscal taxation on their nuclear power generation. The tax on electrical energy, paid by the consumer, was raised by SEK 0.011 to SEK 0.162 per kWh. The tax on diesel fuel was increased at the same time by SEK 0.25 per litre. In addition, a special network fee of SEK 0.002 per kWh came into existence in order to finance small-scale electricity generation, following removal of the obligation-to-receive system. The Swedish

  10. Annual Report 1999. Electric power in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-15

    Barsebaeck 1 was closed on 30 November 1999. Barsebaeck's output of approximately 4 TWh per year will primarily be replaced by imports from coal-fired plants in Denmark and Germany. During the year, the closure of Swedish fossil-fired condensing power stations continued. With that, over 3,000 MW of peak-load power has been shut down during recent years. Consequently, situations entailing shortages of power can arise. On the deregulated electricity market, it is only the system operators that have a satisfactory overview of the overall electricity balance. The Swedish Power Association has thus lobbied the government as regards the need to elucidate Svenska Kraftnaet's responsibility. In a governmental decision from December, Svenska Kraftnaet was given the task of, among other things, monitoring the available capacity during peak loads and developing market instruments that can contribute to safeguarding the availability of power during peak loads. Svenska Kraftnaet has acquired gas turbines with a combined output power of 400 MW from Vattenfall. In order to cover the remaining requirement for rapid disruption reserves, Svenska Kraftnaet also has agreements with several power producers regarding a further 800 MW of gas turbine capacity. One further possibility lies in agreements with industry regarding the disconnection of consumption during times of peak loading. On 1 January 2000, the nuclear power tax was increased by SEK 0.005 per kWh to SEK 0.027 per kWh. This means that the nuclear power companies pay approximately SEK 1,800 MSEK per year in fiscal taxation on their nuclear power generation. The tax on electrical energy, paid by the consumer, was raised by SEK 0.011 to SEK 0.162 per kWh. The tax on diesel fuel was increased at the same time by SEK 0.25 per litre. In addition, a special network fee of SEK 0.002 per kWh came into existence in order to finance small-scale electricity generation, following removal of the obligation-to-receive system

  11. Effective use of electric power facilities and promotion of energy conservation

    International Nuclear Information System (INIS)

    Tokumitsu, Iwao

    1999-01-01

    The capacity of Japan's commercial electric power facilities has been increased to more than 200 million kw. In order to provide a stable supply of electric power to meet constantly fluctuaring electric power demands, Japan's power plants generate electricity using an optimal combination of facilities, with nuclear power and coal-fired thermoelectric power providing the base load supply. In the use of electric power, moreover, measures are being implemented to reduce generation costs, conserve energy, and cut carbon dioxide emissions by reducing maximum output and equalizing the load. This report presents information concerning measures for improving the efficiency of electric power facilities operation, equalizing the load and promoting energy conservation. (author)

  12. Overview of electric power industry of main countries in the world

    International Nuclear Information System (INIS)

    2013-01-01

    The electric power supply system, power producer, regulation system, electricity liberalization, power demand and supply, electricity rate, development of electric power sources, nuclear power generation and renewable energy of six countries such as USA, England, German, France, Russia and China are reported. On USA, 3,754 x 10 9 kWh of total electric energy, 104 of nuclear reactors are running and giving careful consideration to safety of the plant. Shale gas production is increasing, and new technology of electric car, smart grid and demand response is developing. On England, 368 x 10 9 kWh of total electric energy, which consisted of 70.4% thermal power, 18.8% nuclear power and 10.8% renewable energy, 18 nuclear reactors are running, but almost nuclear power plants will be closed until 2023. Biomass and wind power have been developed. On German, 609 x 10 9 kWh of total electric energy, 9 nuclear reactors are running but closed till 2022, the renewable energy such as wind power and photovoltaic is introduced. On France, 542 x 10 9 kWh total electric energy, which consisted of 9% hydroelectricity, 9% thermal power, 78% nuclear power and 4% renewable energy. The renewable energy plan is formulated. On Russia, 1,052 x 10 9 kWh total electric energy consisted of 67.8% thermal power, 15.7% hydroelectricity and 16.4% nuclear power, 32 nuclear power plants are running and 9 nuclear reactors building. On China, 4,693 x 10 9 kWh power consumption, 6 nuclear power plants are running to generate 1.85% electric energy, the objects of nuclear power generation and renewable energy were announced. (S.Y.)

  13. Electric power prices, price control and competition on the European domestic electric power market. Stromtarife, Preisaufsicht und Wettbewerb im Europaeischen Binnenmarkt fuer Strom

    Energy Technology Data Exchange (ETDEWEB)

    Weigt, N

    1993-01-01

    If one speaks of electric power prices and price control in the year 1992, this subject has a different dimension than it did two or three years ago, when the new federal rate scale for electric power (ETO Elt) was drawn up and put into practice. Since the beginning of this year, a draft for guidelines which was drawn up by the EC Commission exists which, going on the assumption that the European domestic electric power market will set an example, does away with territorial protection and in the name of third party access (TPA) allows for electric power-line transit, thus introducing at least partial competition to the electric power market. We no longer think in terms of closed systems with clear-cut responsibilities in regard to power supply, which form the basis for the laws on electric power prices, the cartel laws, the practices of the electric power control board and the cartel authorities. Thus, using the new federal rate scale for electric power and its principles as formulated in Article 1 as a point of departure, developments will go in the direction of a competitive system in accordance with the ideas of the EC Commission and German free-enterprise theoreticians, as laid down for example by the deregulation commission. Thus developments will lead us away from the status quo in the direction of possible reforms, if not to say revolutionary structural changes and the consequnces which they will bring for price and cartel laws. (orig.)

  14. Electrical power system integrated thermal/electrical system simulation

    International Nuclear Information System (INIS)

    Freeman, W.E.

    1992-01-01

    This paper adds thermal properties to previously developed electrical Saber templates and incorporates these templates into a functional Electrical Power Subsystem (EPS) simulation. These combined electrical and thermal templates enable the complete and realistic simulation of a vehicle EPS on-orbit. Applications include on-orbit energy balance determinations for system load changes, initial array and battery EPS sizing for new EPS development, and array and battery technology trade studies. This effort proves the versatility of the Saber simulation program in handling varied and complex simulations accurately and in a reasonable amount of computer time. 9 refs

  15. Electric power monthly, August 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-13

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  16. Electric power monthly, September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-17

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  17. Power quality load management for large spacecraft electrical power systems

    Science.gov (United States)

    Lollar, Louis F.

    1988-01-01

    In December, 1986, a Center Director's Discretionary Fund (CDDF) proposal was granted to study power system control techniques in large space electrical power systems. Presented are the accomplishments in the area of power system control by power quality load management. In addition, information concerning the distortion problems in a 20 kHz ac power system is presented.

  18. Electric power in Canada, 1990

    International Nuclear Information System (INIS)

    1991-01-01

    This report reviews the structure of the electric power industry in Canada, describes the regulatory structures that are in place, and puts the Canadian electricity industry into an international context. It presents statistics on electricity generation and consumption, imports and exports, transmission, costs and pricing, and financing. It forecasts anticipated energy demands, generating capacity and actual generation, exports, fuel requirements, and expenditures. The impacts of demand-side management and non-utility generation are discussed. (82 tabs., 23 figs.)

  19. Electric power in Canada, 1989

    International Nuclear Information System (INIS)

    1991-01-01

    This report reviews the structure of the electric power industry in Canada, describes the regulatory structures that are in place, and puts the Canadian electricity industry into an international context. It presents statistics on electricity generation and consumption, imports and exports, transmission, costs and pricing, and financing. It forecasts anticipated energy demands, generating capacity and actual generation, exports, fuel requirements, and expenditures. The impacts of demand-side management and non-utility generation are discussed. (78 tabs., 27 figs.)

  20. Proceedings: Power Plant Electric Auxiliary Systems Workshop

    International Nuclear Information System (INIS)

    1992-06-01

    The EPRI Power Plant Electric Auxiliary Systems Workshop, held April 24--25, 1991, in Princeton, New Jersey, brought together utilities, architect/engineers, and equipment suppliers to discuss common problems with power plant auxiliary systems. Workshop participants presented papers on monitoring, identifying, and solving problems with auxiliary systems. Panel discussions focused on improving systems and existing and future plants. The solutions presented to common auxiliary system problems focused on practical ideas that can enhance plant availability, reduce maintenance costs, and simplify the engineering process. The 13 papers in these proceedings include: Tutorials on auxiliary electrical systems and motors; descriptions of evaluations, software development, and new technologies used recently by electric utilities; an analysis of historical performance losses caused by power plant auxiliary systems; innovative design concepts for improving auxiliary system performance in future power plants

  1. Rural electric power infrastructure and infantile work; Infraestrutura energetica rural e incidencia de trabalho infantil

    Energy Technology Data Exchange (ETDEWEB)

    Schmid, Aloisio Leoni [Parana Univ., Curitiba, PR (Brazil). Dept. de Arquitetura]. E-mail: alschmid@uol.com.br

    2000-07-01

    Based both on the data available at the IBGE (Brazilian Geographic and Statistical Institute) Worldwide Web site from the Censo Agropecuario de 1996 and on the premise, that human energy is one of the most important energy sources in rural areas, the existence of a correlation of infant work and electric energy infrastructure in Brazilian rural properties was investigated. The verification was conducted first by Municipality, and second by product. Analysis covered agriculture, poultry and extractive practices. As a result, first part led to no correlation at all. However, the second part suggested a correlation to exist between share of rural workers under 14 and share of rural properties not having access to electric energy services. This correlation refers to the share of workers being both under 14 and belonging to the owner's family, corroborating the indication, in the literature, of infant work being a familiar tradition in the Brazilian countryside. Finally, the advance of the investigations with an approach more specific to region and character of economic activity is recommended. (author)

  2. Improving the taxation regime for electric power

    International Nuclear Information System (INIS)

    Fjermeros, Morten; Ilstad, Kristine

    2003-01-01

    In Norway, the present taxation regime for electric power is very complex. The power companies are currently charged with ordinary tax on profits, tax on economic rent, tax on natural resources and land tax. In addition there are the rules about licence fees, yield of power due to concession conditions, and reversion. The Norwegian Electricity Industry Association (EBL), assisted by a firm of lawyers, has proposed an improvement over the current taxation regime

  3. Electric power monthly, May 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Statistics by company and plant are published on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  4. Electric power monthly, April 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the U.S., Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. This April 1994 issue contains 1993 year-end data and data through January 1994.

  5. A comparative study of health hazards and environmental impacts for electricity generation through nuclear energy hidroelectricity and coal fired thermoeletrical generation

    International Nuclear Information System (INIS)

    Guimaraes, C.A.

    1982-01-01

    Environmental impacts and health hazards were comparatively assessed in regard to electricity generation via nuclear energy, hidraulic dams and coal firing. The main aspects covered the nuclear reactor and its associated nuclear fuel cycle, coal fired thermoelectrical power plant its associated coal industry, and hidroelectrical power plant and its dam. Besides specific comparisons of impacts in the air, water, soil and health hazards an evaluation for the Brazilian case was made based on a forecast of electricity demand up to the year 2020. For the nuclear option the consequences were analysed based on American data since no data is yet available for Brazil. Coal firing option was also analised for based heavily on American data due to small Brazilian experience in this sector of energy generation. For hydroelectrical option Brazilian data were used mostly from CESP for comparative purposes. These alternatives for generation of electricity considered in this study are the most relevant for the next four decades for Brazil. (Author) [pt

  6. Microelectronics in power electronics and electrical drives

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    From October, 1214, 1982 at Darmstadt (FRG) a meeting took place on ''Microelectronics in power electronics and Electrical Drives''. This volume contains the papers of the 65 lectures, held at the symposium. For each of the 10 papers dealing with problems on electric-powered vehicles a separate subject analysis has been carried out.

  7. Power processing for electric propulsion

    Science.gov (United States)

    Finke, R. C.; Herron, B. G.; Gant, G. D.

    1975-01-01

    The potential of achieving up to 30 per cent more spacecraft payload or 50 per cent more useful operating life by the use of electric propulsion in place of conventional cold gas or hydrazine systems in science, communications, and earth applications spacecraft is a compelling reason to consider the inclusion of electric thruster systems in new spacecraft design. The propulsion requirements of such spacecraft dictate a wide range of thruster power levels and operational lifetimes, which must be matched by lightweight, efficient, and reliable thruster power processing systems. This paper will present electron bombardment ion thruster requirements; review the performance characteristics of present power processing systems; discuss design philosophies and alternatives in areas such as inverter type, arc protection, and control methods; and project future performance potentials for meeting goals in the areas of power processor weight (10 kg/kW), efficiency (approaching 92 per cent), reliability (0.96 for 15,000 hr), and thermal control capability (0.3 to 5 AU).

  8. Strategic planning and controlling model for electricity distribution concessionaires in Brazil; Modelo de planejamento estrategico e de controle de gestao para as empresas distribuidoras de energia eletrica no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Margueron, Marcus Vinicius Lourenco

    2008-02-15

    Corporate strategies of agents operating in the electric power sector must be constantly aligned with current regulatory structure. This thesis presents an innovative study, which allows the definition of strategies for distributors located in the partially deregulated Brazilian electric power sector, in which the coexistence of regulation and competition results in business environments where competitive threats and cooperation opportunities must be very well managed. It concludes that the best competitive strategy for Brazilian distributors should be cost leadership aiming at encouraging fidelity of the three complementary agents able to freely circulate between both different environments of electric power contracting in Brazil - regulated contracting environment and free contracting environment. These three complementary agents are potentially free consumers, power producers and technology companies. (author)

  9. The production of soft power: practising solidarity in Brazilian South–South development projects

    DEFF Research Database (Denmark)

    Bry, Sandra

    2015-01-01

    Brazil’s development cooperation and solidarity discourse have been portrayed as soft power resources. However, few studies have analysed how Brazil implements development cooperation, and soft power theory itself suffers from a lack of empirical evidence. This article looks at the perceptions...... of participants in three Brazilian projects, particularly how soft empowerment is manifested through the demand-driven and horizontality approaches to development cooperation. I contend that these approaches have produced a positive image among the “recipients”, and I show that their perceptions of development...

  10. TQC works in newly-built nuclear power plant and main electric power system plannings

    International Nuclear Information System (INIS)

    Akiyama, Yoshihisa; Kawakatsu, Tadashi; Hashimoto, Yasuo

    1985-01-01

    In the Kansai Electric Power Co., Inc., TQC has been introduced to solve such major problems in nuclear power generation as the securing of nuclear power reliability, the suppression of rises in the costs, the reduction in long periods of power failure and the promotion in siting of nuclear power plants. It is thus employed as a means of the ''creation of a slim and tough business constitution''. The state of activities in Kansai Electric are described in quality assurance of a newly-built nuclear power plant and in raising the reliability of the main electric power system to distribute the generated nuclear power and further the future prospects are explained. (Mori, K.)

  11. Power generation investment in electricity markets

    International Nuclear Information System (INIS)

    2003-01-01

    Most IEA countries are liberalizing their electricity markets, shifting the responsibility for financing new investment in power generation to private investors. No longer able to automatically pass on costs to consumers, and with future prices of electricity uncertain, investors face a much riskier environment for investment in electricity infrastructure. This report looks at how investors have responded to the need to internalize investment risk in power generation. While capital and total costs remain the parameters shaping investment choices, the value of technologies which can be installed quickly and operated flexibly is increasingly appreciated. Investors are also managing risk by greater use of contracting, by acquiring retail businesses, and through mergers with natural gas suppliers. While liberalization was supposed to limit government intervention in the electricity market, volatile electricity prices have put pressure on governments to intervene and limit such prices. This study looks at several cases of volatile prices in IEA countries' electricity markets, and finds that while market prices can be a sufficient incentive for new investment in peak capacity, government intervention into the market to limit prices may undermine such investment

  12. Thermal Management of Power Electronics and Electric Motors for Electric-Drive Vehicles (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, S.

    2014-09-01

    This presentation is an overview of the power electronics and electric motor thermal management and reliability activities at NREL. The focus is on activities funded by the Department of Energy Vehicle Technologies Office Advanced Power Electronics and Electric Motors Program.

  13. Wireless electricity (Power) transmission using solar based power satellite technology

    International Nuclear Information System (INIS)

    Maqsood, M; Nasir, M Nauman

    2013-01-01

    In the near future due to extensive use of energy, limited supply of resources and the pollution in environment from present resources e.g. (wood, coal, fossil fuel) etc, alternative sources of energy and new ways to generate energy which are efficient, cost effective and produce minimum losses are of great concern. Wireless electricity (Power) transmission (WET) has become a focal point as research point of view and nowadays lies at top 10 future hot burning technologies that are under research these days. In this paper, we present the concept of transmitting power wirelessly to reduce transmission and distribution losses. The wired distribution losses are 70 – 75% efficient. We cannot imagine the world without electric power which is efficient, cost effective and produce minimum losses is of great concern. This paper tells us the benefits of using WET technology specially by using Solar based Power satellites (SBPS) and also focuses that how we make electric system cost effective, optimized and well organized. Moreover, attempts are made to highlight future issues so as to index some emerging solutions.

  14. Recent advances in nuclear powered electric propulsion for space exploration

    International Nuclear Information System (INIS)

    Cassady, R. Joseph; Frisbee, Robert H.; Gilland, James H.; Houts, Michael G.; LaPointe, Michael R.; Maresse-Reading, Colleen M.; Oleson, Steven R.; Polk, James E.; Russell, Derrek; Sengupta, Anita

    2008-01-01

    Nuclear and radioisotope powered electric thrusters are being developed as primary in space propulsion systems for potential future robotic and piloted space missions. Possible applications for high-power nuclear electric propulsion include orbit raising and maneuvering of large space platforms, lunar and Mars cargo transport, asteroid rendezvous and sample return, and robotic and piloted planetary missions, while lower power radioisotope electric propulsion could significantly enhance or enable some future robotic deep space science missions. This paper provides an overview of recent US high-power electric thruster research programs, describing the operating principles, challenges, and status of each technology. Mission analysis is presented that compares the benefits and performance of each thruster type for high priority NASA missions. The status of space nuclear power systems for high-power electric propulsion is presented. The paper concludes with a discussion of power and thruster development strategies for future radioisotope electric propulsion systems

  15. Recent advances in nuclear powered electric propulsion for space exploration

    Energy Technology Data Exchange (ETDEWEB)

    Cassady, R. Joseph [Aerojet Corp., Redmond, CA (United States); Frisbee, Robert H. [Jet Propulsion Laboratory, Pasadena, CA (United States); Gilland, James H. [Ohio Aerospace Institute, Cleveland, OH (United States); Houts, Michael G. [NASA Marshall Space Flight Center, Huntsville, AL 35812 (United States); LaPointe, Michael R. [NASA Marshall Space Flight Center, Huntsville, AL 35812 (United States)], E-mail: michael.r.lapointe@nasa.gov; Maresse-Reading, Colleen M. [Jet Propulsion Laboratory, Pasadena, CA (United States); Oleson, Steven R. [NASA Glenn Research Center, Cleveland, OH (United States); Polk, James E. [Jet Propulsion Laboratory, Pasadena, CA (United States); Russell, Derrek [Northrop Grumman Space Technology, Redondo Beach, CA (United States); Sengupta, Anita [Jet Propulsion Laboratory, Pasadena, CA (United States)

    2008-03-15

    Nuclear and radioisotope powered electric thrusters are being developed as primary in space propulsion systems for potential future robotic and piloted space missions. Possible applications for high-power nuclear electric propulsion include orbit raising and maneuvering of large space platforms, lunar and Mars cargo transport, asteroid rendezvous and sample return, and robotic and piloted planetary missions, while lower power radioisotope electric propulsion could significantly enhance or enable some future robotic deep space science missions. This paper provides an overview of recent US high-power electric thruster research programs, describing the operating principles, challenges, and status of each technology. Mission analysis is presented that compares the benefits and performance of each thruster type for high priority NASA missions. The status of space nuclear power systems for high-power electric propulsion is presented. The paper concludes with a discussion of power and thruster development strategies for future radioisotope electric propulsion systems.

  16. Slovak electric power systems 1920 - 1994

    International Nuclear Information System (INIS)

    Sladek, V.

    1996-01-01

    The purpose of this book is to present the picture of more than 110-year old history of the building and maintenance of power stations in Slovakia. The beginnings were the same as elsewhere in the world. Small, local sources of electrical energy had been built for own needs and it had lasted for decades, until people realized that electricity could be produced for the whole communities and towns and that there was a possibility of the supply of the electricity for public. The purposeful electrification although started in this country only after the World War I, after the Law No. 438/1918 had been issued. While the period till the World War I has the character of endless experiments of utilizing electrical industry, transport, agriculture and households, the period after World War I is explicitly focused on building of unified electrification system for production, transport and distribution of electrical energy. Instead of course, the experts are trained for the first time at professional technical schools and after the year 1943 also at the School of Technology in Bratislava, the predecessor of the University of technology and at the other professional schools. Time is ready. The demand for electrical energy is growing together with the power of generators and voltage level of distribution lines. Besides the energy supply, also power plants, production and supply of heat started to be prosperous, especially in the regions where conditions for such activities had been provided. The changes in the 'power station family' are also registered in the legislative documents, which better present and explain the new historical circumstances. The lives of power station employees were deeply affected by many political and war event in the period of the World War II. In spite of this fact, they could manage their tasks also in these extraordinary conditions. The short part is about the social security of employees. The conclusion contains also basic conceptions envisaged for

  17. Evolving natural gas markets: LNG possibilities for a hydrothermal power system

    Energy Technology Data Exchange (ETDEWEB)

    Correia, Tiago B.; Resende, Joao P.; Costa, Agnes M. [Brazilian Ministry of Mines and Energy, Brasilia, DF (Brazil)

    2008-07-01

    The latest advancements in the natural gas - NG industry have brought new opportunities for the resource's application, especially in the power industry. On the one hand, rapid growth in demand and falling costs of transportation over long distances, particularly as liquefied natural gas - LNG, should lead to a more integrated NG world market. On the other, the deregulation of electricity markets and the growth of independent power producers - IPPs using NG as a fuel for generating peak load power have increased the demand for more flexible NG supply contracts. These factors have allowed a shift in the timing of investment and contract negotiation in NG market. Traditionally, firms searched for trading partners and signed long-term contracts before investing in infrastructure. In the evolving LNG market, producers invest in infrastructure before they have buyers for all their expected outputs, while buyers undertake investment before having firm contracts for all their expected NG needs. These technological and market changes may foster greater participation of a fully flexible NG power plants in the Brazilian electricity market. Nowadays, thermal power long-term capacity contracts customized and negotiated in the local electricity pool (ACR) require power producer to award guarantees of NG firm supply, substantially increasing their cost. A combination of flexible LNG supply contracts and electricity pool contracts may present a solution to the lack of competitiveness of NG power plants in the Brazilian power industry. (author)

  18. Wireless power transfer for electric vehicle

    OpenAIRE

    Mude, Kishore Naik

    2015-01-01

    Wireless Power Transfer (WPT) systems transfer electric energy from a source to a load without any wired connection. WPTs are attractive for many industrial applications because of their advantages compared to the wired counterpart, such as no exposed wires, ease of charging, and fearless transmission of power in adverse environmental conditions. Adoption of WPTs to charge the on-board batteries of an electric vehicle (EV) has got attention from some companies, and efforts are being made for ...

  19. The electric power industry in Norway

    International Nuclear Information System (INIS)

    Baleo, J.N.; Anthoine, K.; Vallon, D.; Baleo, V.

    2003-03-01

    As more than 99% of the electric power in Norway come from the hydro energy, the climatic conditions influence the energy prices. Since 1996 and because of an increasing consumption, the country needs to import electric power from Sweden, Denmark, Finland and for a little part Russia. This report evaluates the today situation, the distribution and production sources, the regulations, the Government policy and the research programs concerning the ''classical energy sources'' and the renewable energies. (A.L.B.)

  20. Hybrid multidimensional design for heterogeneous data supported by ontological analysis: an application case in the Brazilian electric system operation

    NARCIS (Netherlands)

    Moreira, João; Cordeiro, Kelli; Campos, Maria Luiza M.; Borges, Marcos

    2015-01-01

    An issue in operating a national electric system is how the corporate image of an Independent System Operator (ISO) can be impacted by disturbances in the system and their related news publications from specialized press. To deal with it, a solution was developed in the context of the Brazilian

  1. Renewable and non-renewable exergy costs and CO2 emissions in the production of fuels for Brazilian transportation sector

    International Nuclear Information System (INIS)

    Flórez-Orrego, Daniel; Silva, Julio A.M. da; Velásquez, Héctor; Oliveira, Silvio de

    2015-01-01

    An exergy and environmental comparison between the fuel production routes for Brazilian transportation sector, including fossil fuels (natural gas, oil-derived products and hydrogen), biofuels (ethanol and biodiesel) and electricity is performed, and the percentage distribution of exergy destruction in the different units of the processing plants is characterized. An exergoeconomy methodology is developed and applied to properly allocate the renewable and non-renewable exergy costs and CO 2 emission cost among the different products of multiproduct plants. Since Brazilian electricity is consumed in the upstream processing stages of the fuels used in the generation thereof, an iterative calculation is used. The electricity mix comprises thermal (coal, natural gas and oil-fired), nuclear, wind and hydroelectric power plants, as well as bagasse-fired mills, which, besides exporting surplus electricity, also produce sugar and bioethanol. Oil and natural gas-derived fuels production and biodiesel fatty acid methyl-esters (FAME) derived from palm oil are also analyzed. It was found that in spite of the highest total unit exergy costs correspond to the production of biofuels and electricity, the ratio between the renewable to non-renewable invested exergy (cR/cNR) for those fuels is 2.69 for biodiesel, 4.39 for electricity, and 15.96 for ethanol, whereas for fossil fuels is almost negligible. - Highlights: • Total and non-renewable exergy costs of Brazilian transportation fuels are evaluated. • Specific CO 2 emissions in the production of Brazilian transportation fuels are determined. • Representative production routes for fossil fuels, biofuels and electricity are reviewed. • Exergoeconomy is used to distribute costs and emissions in multiproduct processes

  2. An options model for electric power markets

    International Nuclear Information System (INIS)

    Ghosh, Kanchan; Ramesh, V.C.

    1997-01-01

    The international electric utility industry is undergoing a radical transformation from an essentially regulated and monopolistic industry to an industry made uncertain with impending deregulation and the advent of competitive forces. This paper investigates the development of an options market for bulk power trading in a market setup while considering power system planning and operational constraints and/or requirements. In so doing it considers the different market based financial derivative instruments while can be used to trade electrical power in bulk and examines how established tools such as Optimal Power Flow (OPF) may be applied in helping to develop a price for bulk power transactions under a market based setup. (Author)

  3. Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming

    Science.gov (United States)

    Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.

  4. Present state of electric power business in United States and Europe

    International Nuclear Information System (INIS)

    Onishi, Kenichi

    2011-01-01

    This article reported present state of nuclear power and electric power business in United States and Europe after Fukushima Daiichi Accident. As for the trend of demand and supply of electric power and policy, the accident forced Germany possibly to proceed with phase-out of nuclear power, but France and United States to sustain nuclear power with no great change of energy policy at this moment. As for the trend of electric power market, there was not state in United States with liberalized retail market of electric power after rolling blackouts occurred in California State in the early 2000s. In Germany proceeding with renewable energy introduction, renewable electricity fed into the grid was paid for by the network operators at fixed tariffs and the costs passed on to electricity consumers were increasing. Renewable Portfolio Standards (RPS) in United States forced the state to introduction of renewable energy to some ratio, and Feed-in Tariff (FIT) introduced in EU in 1990s lead to introduction of a large amount of renewable electricity targeted in 2020. Huge amount of wind power introduction brought about several problems to solve such that excess electric power above domestic demand had bad effects on grids in neighboring region. Enforcement of power transmission lines was also needed with increase of maximum electric power as well as introduction of a large amount of renewable electricity. (T. Tanaka)

  5. Quality electricity lines of external power systems electric traction DC

    Directory of Open Access Journals (Sweden)

    A.V. Petrov

    2012-08-01

    Full Text Available The results of studies that compare and analyze the numerical values of some key indicators quality electricity in the lines of the external power supply system the electric traction DC. As a supplement are additional and fundamental values of energy losses in them.

  6. Electric power monthly, April 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national Census division, and State level. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data are given for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatt hour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 6 figs., 57 tabs

  7. Multiagent based protection and control in decentralized electric power systems

    DEFF Research Database (Denmark)

    Saleem, Arshad; Lind, Morten; Veloso, Manuela

    2010-01-01

    Electric power systems are going through a major change both in their physical and control structure. A large num- ber of small and geographically dispersed power generation units (e.g., wind turbines, solar cells, plug-in electric cars) are replacing big centralized power plants. This shift has...... created interesting possibilities for application of intelligent systems such as multiagent systems for control and automation in electric power systems. This paper describes work on designing a multiagent system for protection and control of electric power distribution networks.It demonstrates how...... explicit modeling of capabilities, states, roles and role transition in agents can capture the control and automation in electric power systems. We present illustrative results from using our proposed schema in realistic simulations....

  8. Costs of electric power generation in different types of power plants

    International Nuclear Information System (INIS)

    Weible, H.

    1977-01-01

    In the framework of our study 'energy - environment - industry' we need among other things the costs of electric power generation. We register their structure in a sub-model. Recently there was disagreement on effective costs of electric power generation particularly when comparing fossil-fuel power plants to nuclear power plants. For this reason, expertises on the costs of electric power generation in nuclear and fossil-fuel power plants were ordered with the Energy-Economic Institute in Cologne as well as with the Battelle Institute in Frankfurt. In the framwork of our paper on the system 'energy - environment - industry' we do not want to give new data potentially required for our task, before the expertises will be finished. Therefore the results given in part III of this lecture are only meant as an example in order to show possible consequences of the cost programs set up, depending on initial data whose general recognition is to be aimed at. Furthermore, the theoretical approach to investment calculation has to win general recognition when recording calculation methods computer-compatibly. Any new formulations discussed in industrial management have not been taken into account. (orig.) [de

  9. The Increase of Power Efficiency of Underground Coal Mining by the Forecasting of Electric Power Consumption

    Science.gov (United States)

    Efremenko, Vladimir; Belyaevsky, Roman; Skrebneva, Evgeniya

    2017-11-01

    In article the analysis of electric power consumption and problems of power saving on coal mines are considered. Nowadays the share of conditionally constant costs of electric power for providing safe working conditions underground on coal mines is big. Therefore, the power efficiency of underground coal mining depends on electric power expense of the main technological processes and size of conditionally constant costs. The important direction of increase of power efficiency of coal mining is forecasting of a power consumption and monitoring of electric power expense. One of the main approaches to reducing of electric power costs is increase in accuracy of the enterprise demand in the wholesale electric power market. It is offered to use artificial neural networks to forecasting of day-ahead power consumption with hourly breakdown. At the same time use of neural and indistinct (hybrid) systems on the principles of fuzzy logic, neural networks and genetic algorithms is more preferable. This model allows to do exact short-term forecasts at a small array of input data. A set of the input parameters characterizing mining-and-geological and technological features of the enterprise is offered.

  10. Electric energy auctions in Brazil and its effect on emissions of greenhouse gases by the electric sector; Leiloes de energia eletrica no Brasil e sua influencia nas emissoes de gases de efeito estufa pelo setor eletrico

    Energy Technology Data Exchange (ETDEWEB)

    Alpire, Ricardo; Pereira, Osvaldo Livio Soliano [Universidade Salvador (UNIFACS), BA (Brazil)

    2010-07-01

    The result of the auctions of electricity, after the new regulatory framework in 2004, has shown the increased participation of fossil sources of thermal generation, contributing to increased emission of greenhouse gases by the Brazilian Electricity Sector. This article aims to analyze the correlation between growth in electric generation sector and rising greenhouse gases, especially through the study of the winning projects of electric power auctions conducted with the advent of the New Institutional Model of the Power Sector from 2004, comparing with the existing policies and prospects of the next auction of the electric sector. (author)

  11. Electric-powered cars in Austria - status and prospects

    International Nuclear Information System (INIS)

    Propper, B.

    1993-01-01

    The number of electric-powered vehicles in Austria is estimated to be 300 at the most. In this article, the reasons for such a low number is being looked at. Austria is ideally located with respect to producing electricity, as two thirds of it are produced by water-power. However, there are only three direct ways of state funding in order to reduce the cost. In the framework of a field test, the use of electric-powered vehicles for community-use is being successfully carried out in Vienna. (orig.) [de

  12. Innovations in techniques of electric power in 2008

    International Nuclear Information System (INIS)

    Ohfusa, Takahiro; Endo, Yukio; Ino, Hiroyuki

    2009-01-01

    Tokyo Electric Power Company (TEPCO), Kansai Electric Power Co., Inc., Tohoku Electric Power and other nine companies reported the results of innovations in techniques of electric power in 2008, Japan. J-Power started construction of the Ohma Nuclear Power Plant (power generating capacity: 1,383 MW, ABWR) in Ohma Town, Aomori prefecture, Japan, in May 2008. TEPCO developed the low vibration control valve and carried out the model experiments using air as fluid and the simulation by computational fluid dynamics. Mach number distribution (ε L =0.068) at the valve showed change of the supersonic jet flow as time advanced and a periodic pressure change on the valve and valve seat. Japan Atomic Power Company reported development of techniques for the established nuclear power station such as control of pipe thinning of the secondary system of PWR by insertion of oxygen at Tsuruga Power Station Unit 2, risk evaluation, the effects of increase of generating power on aging deterioration, and development of heat protective clothing. Researched are a power generation plant of small-and-medium-size reactors which took in reforming technology using the location to a narrow site, funds by stakeholders and the idea of future 'fast breeder reactor system', sodium-cooled loop type reactor, which uses TRU as fuel. The accumulator tank of new type safety system for Tsuruga Power Station Unit 3 and 4 is designed and tested. Decommissioning process of Tokai Power Plant and recycling of shielding materials, blocks and concrete powder are stated. (S.Y.)

  13. Electricity for Road Transport, Flexible Power Systems and Wind Power

    DEFF Research Database (Denmark)

    Nielsen, Lars Henrik; Ravn, Hans; Meibom, Peter

    The aim of the project is to analyse the potential synergistic interplay that may arise between the power sector and the transport sector, if parts of the road transport energy needs are based on electricity via the utilisation of plug-in hybrid electric vehicles and pure electric vehicles....... The project focuses on the technical elements in the chain that comprises: 1: The electric vehicle status, potentials and expected development. Electric batteries are in focus in this part of the analysis. 2: Analysis of plug-in hybrid electric vehicle interacting with a local grid. 3: Analysis of grid-vehicle...

  14. The generation of pollution-free electrical power from solar energy.

    Science.gov (United States)

    Cherry, W. R.

    1971-01-01

    Projections of the U.S. electrical power demands over the next 30 years indicate that the U.S. could be in grave danger from power shortages, undesirable effluence, and thermal pollution. An appraisal of nonconventional methods of producing electrical power is conducted, giving particular attention to the conversion of solar energy into commercial quantities of electrical power by solar cells. It is found that 1% of the land area of the 48 states could provide the total electrical power requirements of the U.S. in the year 1990. The ultimate method of generating vast quantities of electrical power would be from a series of synchronous satellites which beam microwave power back to earth to be used wherever needed. Present high manufacturing costs of solar cells could be substantially reduced by using massive automated techniques employing abundant low cost materials.

  15. The development of electric power/energy trading in Norway

    International Nuclear Information System (INIS)

    Engebretsen, J.D.

    1992-01-01

    One of the main aims of the Norwegian government is to make the electric power market more effective. A new energy law has been passed and other initiatives have been taken which have altered the framework of the conditions for electricity production and sales in Norway. The proposition for trading electric power and the development of new policies for calculating transmission tariffs has been dealt with in addition to plans for the extent of the development of hydroelectric power. Norway is the world's sixth largest producer of hydroelectricity. The domestic supply of electricity is described as well as the nature of the reorganization of the transmission of electricity and Norwegian foreign trade proposals within this area. The government is interested in taxing with regard to production instead of on the power itself in order to stimulate better energy economy. It is important that this will have a neutral effect between export and domestic consumption when contract sales to abroad are initiated. A more efficient electric power market will profit Norwegian society. Statistical data are included. (AB)

  16. Results of an electrical power system fault study

    Science.gov (United States)

    Dugal-Whitehead, Norma R.; Johnson, Yvette B.

    1992-01-01

    NASA-Marshall conducted a study of electrical power system faults with a view to the development of AI control systems for a spacecraft power system breadboard. The results of this study have been applied to a multichannel high voltage dc spacecraft power system, the Large Autonomous Spacecraft Electrical Power System (LASEPS) breadboard. Some of the faults encountered in testing LASEPS included the shorting of a bus an a falloff in battery cell capacity.

  17. Geothermal electric power generation in Iceland for the proposed Iceland/United Kingdom HVDC power link

    International Nuclear Information System (INIS)

    Hammons, T.J.; Palmason, G.; Thorhallsson, S.

    1991-01-01

    The paper reviews geothermal electric power potential in Iceland which could economically be developed to supplement hydro power for the proposed HVDC Power Link to the United Kingdom, and power intensive industries in Iceland, which are envisaged for development at this time. Technically harnessable energy for electricity generation taking account of geothermal resources down to an assumed base depth, temperature distribution in the crust, probable geothermal recovery factor, and accessibility of the field, has been assessed. Nineteen known high-temperature fields and 9 probable fields have been identified. Technically harnessable geo-heat for various areas is indicated. Data on high temperature fields suitable for geothermal electric power generation, and on harnessable energy for electric power generation within volcanic zones, is stated, and overall assessments are made. The paper then reviews how the potential might be developed, discussing preference of possible sites, and cost of the developments at todays prices. Cost of geothermal electric power generation with comparative costs for hydro generation are given. Possible transmission system developments to feed the power to the proposed HVDC Link converter stations are also discussed

  18. PCA Fault Feature Extraction in Complex Electric Power Systems

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2010-08-01

    Full Text Available Electric power system is one of the most complex artificial systems in the world. The complexity is determined by its characteristics about constitution, configuration, operation, organization, etc. The fault in electric power system cannot be completely avoided. When electric power system operates from normal state to failure or abnormal, its electric quantities (current, voltage and angles, etc. may change significantly. Our researches indicate that the variable with the biggest coefficient in principal component usually corresponds to the fault. Therefore, utilizing real-time measurements of phasor measurement unit, based on principal components analysis technology, we have extracted successfully the distinct features of fault component. Of course, because of the complexity of different types of faults in electric power system, there still exists enormous problems need a close and intensive study.

  19. Medium-term electric power demand forecasting based on economic-electricity transmission model

    Science.gov (United States)

    Li, Wenfeng; Bao, Fangmin; Bai, Hongkun; Liu, Wei; Liu, Yongmin; Mao, Yubin; Wang, Jiangbo; Liu, Junhui

    2018-06-01

    Electric demand forecasting is a basic work to ensure the safe operation of power system. Based on the theories of experimental economics and econometrics, this paper introduces Prognoz Platform 7.2 intelligent adaptive modeling platform, and constructs the economic electricity transmission model that considers the economic development scenarios and the dynamic adjustment of industrial structure to predict the region's annual electricity demand, and the accurate prediction of the whole society's electricity consumption is realized. Firstly, based on the theories of experimental economics and econometrics, this dissertation attempts to find the economic indicator variables that drive the most economical growth of electricity consumption and availability, and build an annual regional macroeconomic forecast model that takes into account the dynamic adjustment of industrial structure. Secondly, it innovatively put forward the economic electricity directed conduction theory and constructed the economic power transfer function to realize the group forecast of the primary industry + rural residents living electricity consumption, urban residents living electricity, the second industry electricity consumption, the tertiary industry electricity consumption; By comparing with the actual value of economy and electricity in Henan province in 2016, the validity of EETM model is proved, and the electricity consumption of the whole province from 2017 to 2018 is predicted finally.

  20. Th european market of the electric power

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the CRE (commission of the Electric power Control) progress report concerning the first july 2000 to the 30 june 2001. Three main subjects are discussed, illustrated by economic data and graphs: the electric power european market, the french market control and the CRE. A special interest is given to the deregulation of the market and its consequences. (A.L.B.)

  1. Common issues concerning electric power and gas

    International Nuclear Information System (INIS)

    1996-01-01

    EDF and GDF, the French government owned electric power and gas utilities have jointly decided to improve their employment and employee situation with the hiring of 11000 to 15000 young people for a 3-year period and the reduction of the working hours. A european disagreement is to be judged concerning electric power and gas import and export monopolies in several european countries

  2. National campaign - 100 collectivities connected to the green electric power

    International Nuclear Information System (INIS)

    2004-01-01

    Since july 2004, the local collectivities, the little and medium enterprises and the craft workers can choose their electric power supplier. This offer can be a chance for the renewable energy. The association ''eco maires'' with the help of the WWF began a campaign to obtain the involvement of 100 collectivities interested by the green electric power. The project is presented. The authors presents also the new European Network on the green electric power, Eugene (European Green Electricity Network), which aims to harmonize criteria on the green electric power and to deliver certificates of quality. (A.L.B.)

  3. History of electric power technological innovation in 2017

    International Nuclear Information System (INIS)

    Yamaguchi, Hiroshi; Okabe, Kazuhiko; Ichimura, Yasunori

    2017-01-01

    This is an overview of the electric power technology innovation of 12 electric power companies in 2016. Among them, this paper outlines the technological contents related to nuclear power of three major companies. TEPCO group applied a sealant from the outside to the back-up seal of reactor containment vessel that had deteriorated. It developed a good sealing system by combining with an improved sealant, and confirmed the effect at an experimental level. Regarding environmental restoration in Fukushima, TEPCO developed a personal dosimetry technology, environmental monitoring technology, and a technology to simulate radiation reduction amount after decontamination. Chubu Electric Power Company conducted researches on the applicability of the start-up range neutron monitor count rate prediction method related to fuel loading after a long-term shut-down of nuclear power generation, basic examination for practical use of laser decontamination, and possibility of tsunami prediction using satellite positioning information. With regard to the decommissioning measures of nuclear power plants, Japan Nuclear Power Electric Generation Co., Ltd. conducted studies on the decommissioning work of the Tokai Power Station, the safe dismantling method of the Tsuruga Power Station Unit 1 as decommissioning measures and fuel management, and the disposal method of radioactive contaminants. In the development of future reactor, this company conducted research on the development of fast breeder reactor system, etc. (A.O.)

  4. Results of an electrical power system fault study (CDDF)

    Science.gov (United States)

    Dugal-Whitehead, N. R.; Johnson, Y. B.

    1993-01-01

    This report gives the results of an electrical power system fault study which has been conducted over the last 2 and one-half years. First, the results of the literature search into electrical power system faults in space and terrestrial power system applications are reported. A description of the intended implementations of the power system faults into the Large Autonomous Spacecraft Electrical Power System (LASEPS) breadboard is then presented. Then, the actual implementation of the faults into the breadboard is discussed along with a discussion describing the LASEPS breadboard. Finally, the results of the injected faults and breadboard failures are discussed.

  5. Energy managment strategies for vehicular electric power systems

    NARCIS (Netherlands)

    Koot, M.W.T.; Kessels, J.T.B.A.; Jager, de A.G.; Heemels, W.P.M.H.; Bosch, van den P.P.J.; Steinbuch, M.

    2005-01-01

    In the near future, a significant increase in electric power consumption in vehicles is expected. To limit the associated increase in fuel consumption and exhaust emissions, smart strategies for the generation, storage/retrieval, distribution, and consumption of electric power will be used. Inspired

  6. New nuclear power plants and the electricity market competition

    International Nuclear Information System (INIS)

    Ruska, M.; Koreneff, G.

    2009-11-01

    The study assesses the effects the different nuclear power plant projects would have on crossownership, market concentration and market power in electricity market. The analyses are given both for Finnish and Nordic power markets. The authors feel that the electricity market should primarily be viewed as a common Nordic market in the future. During 2000 to 2008 the hours when Finland was an own price area ranged from 1 % to 29 % as annual averages. In the future it will be more and more seldom that Finland will become an own deficit price area, because the cross-border transmission capacity to Sweden will increase as will Finnish electricity production capacity. In addition, the extension of Nord Pool to the Baltic will increase the size of the market. The ownership of power plants is typically organized through power share companies in Finland. Two of the three nuclear power plant projects are joint ventures with several electricity producers and consumers. The current ownership relations and what effects the new projects might have on them were analyzed in this study. The competitiveness of different electricity production forms in the future was assessed using different market scenarios based on varying demand expectations. The capacity structure was assumed to stay quite unchanged, where the biggest change is expected to come from new renewable power capacity due to EU targets. Conventional condensing power production will decrease and Nordic electricity exports will increase in the future. The market concentration would increase in Finland with new nuclear plants, the most if Fortum were the builder. Vattenfall has a decidedly larger electricity production in the Nordic countries than Fortum, and Vattenfall's capacity would be unchanged by the new planned nuclear plants. The nuclear power plant projects do not therefore increase market concentration significantly on a Nordic level. Nuclear power is not used for day or hour regulation in Finland, which means

  7. Energy and Environment. Electric power stock exchange

    International Nuclear Information System (INIS)

    Fazioli, R.; Antonioli, B.; Beccarello, M.; Da Rin, B.

    2000-01-01

    In this paper are reported the structural characteristics of electric power stock exchange in the processes liberalization of european electric markets. International experience are also considered [it

  8. On using PEMFC for Electrical Power Generation on More Electric Aircraft

    OpenAIRE

    Jenica Ileana Corcau; Liviu Dinca

    2012-01-01

    The electrical power systems of aircrafts have made serious progress in recent years because the aircrafts depend more and more on the electricity. There is a trend in the aircraft industry to replace hydraulic and pneumatic systems with electrical systems, achieving more comfort and monitoring features and enlarging the energetic efficiency. Thus, was born the concept More Electric Aircraft. In this paper is analyzed the integration of a fuel cell into the existing elect...

  9. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  10. Influence of wind power, plug-in electric vehicles, and heat storages on power system investments

    International Nuclear Information System (INIS)

    Kiviluoma, Juha; Meibom, Peter

    2010-01-01

    Due to rising fuel costs, the substantial price for CO 2 emissions and decreasing wind power costs, wind power might become the least expensive source of power for an increasing number of power systems. This poses the questions of how wind power might change optimal investments in other forms of power production and what kind of means could be used to increase power system flexibility in order to incorporate the variable power production from wind power in a cost-effective manner. We have analysed possible effects using an investment model that combines heat and power production and simulates electric vehicles. The model runs in an hourly time scale in order to accommodate the impact of variable power production from wind power. Electric vehicles store electricity for later use and can thus serve to increase the flexibility of the power system. Flexibility can also be upgraded by using heat storages with heat from heat pumps, electric heat boilers and combined heat and power (CHP) plants. Results show that there is great potential for additional power system flexibility in the production and use of heat. (author)

  11. Electric power annual 1994. Volume 2, Operational and financial data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-28

    This year, the annual is published in two volumes. Volume I focused on US electric utilities and contained final 1994 data on net generation, fossil fuel consumption, stocks, receipts, and cost. This Volume II presents annual 1994 summary statistics for the electric power industry, including information on both electric utilities and nonutility power producers. Included are preliminary data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold (based on form EIA-861) and for electric utility financial statistics, environmental statistics, power transactions, and demand- side management. Final 1994 data for US nonutility power producers on installed capacity and gross generation, as well as supply and disposition information, are also provided in Volume II. Technical notes and a glossary are included.

  12. Advanced design nuclear power plants: Competitive, economical electricity. An analysis of the cost of electricity from coal, gas and nuclear power plants

    International Nuclear Information System (INIS)

    1992-06-01

    This report presents an updated analysis of the projected cost of electricity from new baseload power plants beginning operation around the year 2000. Included in the study are: (1) advanced-design, standardized nuclear power plants; (2) low emissions coal-fired power plants; (3) gasified coal-fired power plants; and (4) natural gas-fired power plants. This analysis shows that electricity from advanced-design, standardized nuclear power plants will be economically competitive with all other baseload electric generating system alternatives. This does not mean that any one source of electric power is always preferable to another. Rather, what this analysis indicates is that, as utilities and others begin planning for future baseload power plants, advanced-design nuclear plants should be considered an economically viable option to be included in their detailed studies of alternatives. Even with aggressive and successful conservation, efficiency and demand-side management programs, some new baseload electric supply will be needed during the 1990s and into the future. The baseload generating plants required in the 1990s are currently being designed and constructed. For those required shortly after 2000, the planning and alternatives assessment process must start now. It takes up to ten years to plan, design, license and construct a new coal-fired or nuclear fueled baseload electric generating plant and about six years for a natural gas-fired plant. This study indicates that for 600-megawatt blocks of capacity, advanced-design nuclear plants could supply electricity at an average of 4.5 cents per kilowatt-hour versus 4.8 cents per kilowatt-hour for an advanced pulverized-coal plant, 5.0 cents per kilowatt-hour for a gasified-coal combined cycle plant, and 4.3 cents per kilowatt-hour for a gas-fired combined cycle combustion turbine plant

  13. Life cycle assessment for coordination development of nuclear power and electric vehicle

    International Nuclear Information System (INIS)

    Liu Hong; Wang Yingrong

    2010-01-01

    Energy, environment and climate change have become focus political topics. In this paper, the life cycle assessment for cooperation development of nuclear power and electric vehicle were analyzed from the view of energy efficiency and pollutant emissions. The assessment results show that the pathway of nuclear power coupled with electric vehicle is better than coal electric power coupled with electric vehicle and normal gasoline coupled with internal combustion engine powered vehicle in terms of the environmental and energy characteristics. To charge the electric vehicle, instead of water power station, can safeguard the stable operation of nuclear power station. The results could provide consulted for coordination development of nuclear power, electric vehicle and brain power electric net. (authors)

  14. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  15. Limiting electric fields of HVDC overhead power lines.

    Science.gov (United States)

    Leitgeb, N

    2014-05-01

    As a consequence of the increased use of renewable energy and the now long distances between energy generation and consumption, in Europe, electric power transfer by high-voltage (HV) direct current (DC) overhead power lines gains increasing importance. Thousands of kilometers of them are going to be built within the next years. However, existing guidelines and regulations do not yet contain recommendations to limit static electric fields, which are one of the most important criteria for HVDC overhead power lines in terms of tower design, span width and ground clearance. Based on theoretical and experimental data, in this article, static electric fields associated with adverse health effects are analysed and various criteria are derived for limiting static electric field strengths.

  16. French electric power balance sheet 2009

    International Nuclear Information System (INIS)

    Lartigau, Thierry; Riere, Alexia

    2010-01-01

    The mission of RTE, the French electricity Transportation grid, a public service assignment, is to balance the electricity supply and demand in real time. This report presents RTE's technical results for the year 2009: key figures of the French electricity consumption, lowering of the French power generation, decrease of trade balance at borders but still positive, continuation of RTE's investments for the improvement of the grid performance. New RTE's infrastructures, electricity quality data, and the evolution of market mechanisms are presented in appendixes

  17. Electric machinery and drives in thermal power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery. (TK) [de

  18. Brazilian pharmaceutical diplomacy: social democratic principles versus soft power interests.

    Science.gov (United States)

    Flynn, Matthew

    2013-01-01

    Current debates concerning the rise of health diplomacy are polarized between competing international relations theories of realism, based on power politics, and constructivist approaches, which emphasize the norms, values, and identities shaping foreign policies. A case study of Brazil's health diplomacy over the past 10 years, focusing on issues related to pharmaceuticals, seeks to provide data to assess these theories. The country's intellectual property disputes, multilateral lobbying efforts, and foreign assistance programs are contrasted with those of the United States, Mexico, and other countries. Instead of viewing Brazilian efforts as a form of soft power, the evidence suggests that the origins of Brazil's involvement and continued efforts in this arena stem more from values based on human rights and social democratic principles. A close examination of domestic political considerations leads to a more nuanced understanding of the drivers behind a country's health diplomacy.

  19. Market power analysis for the Iranian electricity market

    International Nuclear Information System (INIS)

    Asgari, Mohammad Hossein; Monsef, Hassan

    2010-01-01

    The market power problem in Iranian electricity market is addressed in this study. This paper by using various structural indices of market power and reviewing market results analyzes the intensity of competition in Iran's electricity market and examines whether this market is functioning at an appropriate level of efficiency. In this article the most well-known indices of market power are calculated in two approaches for two different scenarios (current situation and future outlook of generation sector's ownership in Iran's power industry). Comparing the results of these scenarios promises more competitive market for the second scenario. Calculating Residual Supply Index for Iran's power market shows despite admissible values of concentration ratios, due to supply scarcity during periods when the demand is close to the total available capacity, some suppliers can exercise market power even with a relatively small market share. The most important price and load indices like weighted average prices and load/price duration curves of Iranian electricity market during March 2007-March 2008 are also analyzed in this paper. These results imply the existence of economic withholding. The main limiting factors of competition and significant implemented countermeasures for market power mitigation in Iran's electricity market are also mentioned.

  20. New model of Brazilian electric sector: implications of sugarcane bagasse on the distributed generation process

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Celso E.L. de; Rabi, Jose A. [Universidade de Sao Paulo (GREEN/FZEA/USP), Pirassununga, SP (Brazil). Fac. de Zootecnia e Engenharia de Alimentos. Grupo de Pesquisa em Reciclagem, Eficiencia Energetica e Simulacao Numerica], Emails: celsooli@usp.br, jrabi@usp.br; Halmeman, Maria Cristina [Universidade Estadual Paulista (FCA/UNESP), Botucatu, SP (Brazil). Fac. de Ciencias Agronomicas

    2008-07-01

    Distributed generation has become an alternative for the lack of resources to large energy projects and for recent facts that have changed the geopolitical panorama. The later have increased oil prices so that unconventional sources have become more and more feasible, which is an issue usually discussed in Europe and in USA. Brazil has followed such world trend by restructuring the electrical sector as well as major related institutions, from generation to commercialization and sector regulation while local legislation has enabled the increase of distributed generation. It regulates the role of the independent energy producer so as to provide direct business between the later and a great consumer, which is an essential step to enlarge energy market. Sugarcane bagasse has been used to produce both electric energy and steam and this paper analyzes and discusses the major implications of a new model for Brazilian electric sector based on sugarcane bagasse use as means to increase distributed generation process, particularly concerned with the commercialization of energy excess. (author)

  1. Design and Implementation of Effective Electrical Power System for Surya Satellite-1

    Science.gov (United States)

    Sulistya, A. H.; Hasbi, W.; Muhida, R.

    2018-05-01

    Surya Satellite-1 is a nanosatellite developed by students of Surya University. The subject of this paper is the design and implementation of effective electrical power system for Surya Satellite 1. The electrical power system role is to supply other systems of the satellite with appropriate electrical power. First, the requirements of the electrical power system are defined. The architecture of the electrical power system is then designed to build the prototype. The orbit simulation is calculated to predict the power production. When prototype test and simulation data is gained, we make an operation scenario to keep the produced power and the consumed power in balance. The design of the modules of the electrical power system is carried out with triple junction solar cells, lithium ion batteries, maximum power point trackers, charging controllers, power distributions, and protection systems. Finally, the prototypes of the electrical power system are presented.

  2. Method for analysing the adequacy of electric power systems with wind power plants and energy storages

    Directory of Open Access Journals (Sweden)

    Perzhabinsky Sergey

    2017-01-01

    Full Text Available Currently, renewable energy sources and energy storage devices are actively introduced into electric power systems. We developed method to analyze the adequacy of these electric power systems. The method takes into account the uncertainty of electricity generation by wind power plants and the processes of energy storage. The method is based on the Monte Carlo method and allowed to use of long-term meteorological data in open access. The performed experimental research of electrical power system is constructed on the basis of the real technical and meteorological data. The method allows to estimate of effectiveness of introducing generators based on renewable energy sources and energy storages in electric power systems.

  3. Integration of electric drive vehicles in the Danish electricity network with high wind power penetration

    DEFF Research Database (Denmark)

    Chandrashekhara, Divya K; Østergaard, Jacob; Larsen, Esben

    2010-01-01

    /conventional) which are likely to fuel these cars. The study was carried out considering the Danish electricity network state around 2025, when the EDV penetration levels would be significant enough to have an impact on the power system. Some of the interesting findings of this study are - EDV have the potential......This paper presents the results of a study carried out to examine the feasibility of integrating electric drive vehicles (EDV) in the Danish electricity network which is characterised by high wind power penetration. One of the main aims of this study was to examine the effect of electric drive...... vehicles on the Danish electricity network, wind power penetration and electricity market. In particular the study examined the effect of electric drive vehicles on the generation capacity constraints, load curve, cross border transmission capacity and the type of generating sources (renewable...

  4. Progress of technological innovation on electric power in FY2014

    International Nuclear Information System (INIS)

    Nishikawa, Yoshikazu; Fujii, Yutaka; Sasagawa, Toshiro

    2015-01-01

    This paper overviews the technological development in FY2014 at Tokyo Electric Power Company, Chubu Electric Power Company, Hokuriku Electric Power Company, Shikoku Electric Power Company, and Electric Power Development Company. In this overview, further breakdown was made for the following departments of each company: nuclear power generation, thermal power generation, hydraulic power generation, power transmission, power distribution, transformation, research and development and technological development, and information and communication. In addition, this paper outlines the achievement of technological development at Japan Atomic Power Company, such as the technological development related to the existing power station, development of new technology, and the development of future reactor. Fukushima Daiichi Nuclear Power Station has developed an investigative system using a high altitude survey robot and a movable monitoring system. Hamaoka Nuclear Power Station examined the feasibility of state diagnostic technique based on multi-point analysis, and studied stress corrosion cracking at the newly established Nuclear Safety Research Laboratory. Shika Nuclear Power Station (Unit 1) applied a pipe stress improvement process by means of high frequency induction heating as a stress corrosion cracking countermeasure. Ikata Nuclear Power Station newly adopted high degree cross-linking cation resin, and high cracking strength anion resin as the primary resins. Oma Nuclear Power Station worked on the all reactor core utilization technology of MOX fuel. (A.O.)

  5. Skylab technology electrical power system

    Science.gov (United States)

    Woosley, A. P.; Smith, O. B.; Nassen, H. S.

    1974-01-01

    The solar array/battery power systems for the Skylab vehicle were designed to operate in a solar inertial pointing mode to provide power continuously to the Skylab. Questions of power management are considered, taking into account difficulties caused by the reduction in power system performance due to the effects of structural failure occurring during the launching process. The performance of the solar array of the Apollo Telescope Mount Power System is discussed along with the Orbital Workshop solar array performance and the Airlock Module power conditioning group performance. A list is presented of a number of items which have been identified during mission monitoring and are recommended for electrical power system concepts, designs, and operation for future spacecraft.

  6. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  7. Nuclear Power and Ghana's Future Electricity Generation

    International Nuclear Information System (INIS)

    Ennison, I.; Dzobo, M.

    2011-01-01

    One of the major challenges facing Ghana in her developmental efforts is the generation of adequate and affordable electricity to meet increasing demand. Problems with the dependency on hydro power has brought insecurity in electricity supply due to periodic droughts. Thermal power systems have been introduced into the electricity generation mix to complement the hydro power supply but there are problems associated with their use. The high price of crude oil on the international market has made them expensive to run and the supply of less expensive gas from Steps are being taken to run the thermal plants on less expensive gas from Nigeria has delayed due to conflicts in the Niger Delta region and other factors. The existing situation has therefore called for the diversification of the electricity generation mix so as to ensure energy security and affordable power supply. This paper presents the nuclear option as a suitable alternative energy source which can be used to address the energy supply problems facing the nation as well the steps being taken towards its introduction in the national energy mix. In addition, electricity demand projections using the MAED model as well as other studies are presented. The expected electricity demand of 350000 GWh (4000MWyr) in 2030, exceeds the total electricity supply capability of the existing hydropower system, untapped hydro resources and the maximum amount of gas that can be imported from Nigeria through the West Africa pipeline. Also presented is a technological assessment on the type of nuclear reactor to be used. The technological assessment which was done based on economics, grid size, technological maturity, passive safety and standardization of reactor design, indicate that a medium sized pressurized water reactor (i.e. a PWR with capacity 300MW to 700MW) is the most favourable type of reactor. In addition the challenges facing the implementation of the nuclear power programme in Ghana are presented. (author)

  8. Performance enhancement using power beaming for electric propulsion earth orbital transporters

    International Nuclear Information System (INIS)

    Dagle, J.E.

    1991-01-01

    An electric propulsion Earth orbital transport vehicle (EOTV) can effectively deliver large payloads using much less propellant than chemical transfer methods. By using an EOTV instead of a chemical upper stage, either a smaller launch vehicle can be used for the same satellite mass or a larger satellite can be deployed using the same launch vehicle. However, the propellant mass savings from using the higher specific impulse of electric propulsion may not be enough to overcome the disadvantage of the added mass and cost of the electric propulsion power source. Power system limitations have been a major factor delaying the acceptance and use of electric propulsion. This paper outlines the power requirements of electric propulsion technology being developed today, including arcjets, magnetoplasmadynamic (MPD) thrusters, and ion engines. Power supply characteristics are discussed for nuclear, solar, and power-beaming systems. Operational characteristics are given for each, as are the impacts of the power supply alternative on the overall craft performance. Because of its modular nature, the power-beaming approach is able to meet the power requirements of all three electric propulsion types. Also, commonality of approach allows different electric propulsion approaches to be powered by a single power supply approach. Power beaming exhibits better flexibility and performance than on-board nuclear or solar power systems

  9. Electric plant cost and power production expenses 1991

    International Nuclear Information System (INIS)

    1993-01-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels (CNEAF); Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  10. Electric plant cost and power production expenses 1990

    International Nuclear Information System (INIS)

    1992-06-01

    Electric Plant Cost and Power Production Expenses is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA); US Department of Energy. This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, Federal, State, and local governments, and the general public. These data are collected and published to fulfill data collection and dissemination responsibilities of the Energy Information Administration (EIA), as specified in the Federal Energy Administration Act (Public Law 93-275), as amended

  11. Customized electric power storage device for inclusion in a microgrid

    Science.gov (United States)

    Goldsmith, Steven Y.; Wilson, David; Robinett, III, Rush D.

    2017-08-01

    An electric power storage device included in a microgrid is described herein. The electric power storage device has at least one of a charge rate, a discharge rate, or a power retention capacity that has been customized for the microgrid. The at least one of the charge rate, the discharge rate, or the power retention capacity of the electric power storage device is computed based at least in part upon specified power source parameters in the microgrid and specified load parameters in the microgrid.

  12. Commercial statistical bulletin of the Brazilian electric utility Centrais Eletricas de Santa Catarina S.A; Boletim estatistico comercial da CELESC: Centrais Eletricas de Santa Catarina S.A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    Statistical data concerning the Brazilian Centrais Eletricas de Santa Catarina S.A. utility relative to April 1996 are presented. They include, among other things, electricity consumption, number and class of consumers and electricity rates 6 figs., 50 tabs.

  13. Strategic prospects of the electric power industry of Russia

    Science.gov (United States)

    Makarov, A. A.; Veselov, F. V.; Makarova, A. S.; Novikova, T. V.; Pankrushina, T. G.

    2017-11-01

    The prospects for the development of the electric power industry of Russia adopted at a regular stage of working out the Energy Strategy and the General Plan of Distribution of the Electric Power Facilities are discussed. The monitoring of the progress in the implementation of the Energy Strategies for the periods until 2020 and 2030 adopted in 2003 and 2009 has, in general, validated the correctness of the estimated volumes of the energy resource production under overestimation of the expected domestic demand owing to an excessively optimistic forecast of the real development of the economy. The priority lines of the national energy policy in electric power and allied industries proposed in the Energy Strategy for the period until 2035 are considered. The tools for implementation of most of the proposals and the effectiveness of their implementation have yet to be defined more concretely. The development of the energy sector and the electric power industry under the conservative and optimistic scenarios of the development of the country's economy has been predicted using the SCANER modeling and information system, viz., the dynamics of the domestic consumption, export, and production of the primary energy and the electric power has been determined and the commissioning and structure of the required generating capacities and the consumption of the basic types of the energy resources by the electric power industry and the centralized heat supply systems has been optimized. Changes in the economic efficiency of the nuclear and thermal power plants under the expected improvements on their cost and performance characteristics and an increase in the domestic fuel prices are presented. The competitiveness of the wind and solar power production under Russian conditions has been evaluated considering the necessity of reservation and partial duplication of their capacities when operated in the power supply systems. When optimizing the electric power industry as a subsystem

  14. Technique applied in electrical power distribution for Satellite Launch Vehicle

    Directory of Open Access Journals (Sweden)

    João Maurício Rosário

    2010-09-01

    Full Text Available The Satellite Launch Vehicle electrical network, which is currently being developed in Brazil, is sub-divided for analysis in the following parts: Service Electrical Network, Controlling Electrical Network, Safety Electrical Network and Telemetry Electrical Network. During the pre-launching and launching phases, these electrical networks are associated electrically and mechanically to the structure of the vehicle. In order to succeed in the integration of these electrical networks it is necessary to employ techniques of electrical power distribution, which are proper to Launch Vehicle systems. This work presents the most important techniques to be considered in the characterization of the electrical power supply applied to Launch Vehicle systems. Such techniques are primarily designed to allow the electrical networks, when submitted to the single-phase fault to ground, to be able of keeping the power supply to the loads.

  15. Wind electric power generation

    International Nuclear Information System (INIS)

    Koch, M. K.; Wind, L.; Canter, B.; Moeller, T.

    2002-01-01

    The monthly statistics of wind electric power generation in Denmark are compiled from information given by the owners of the private wind turbines. For each wind turbine the name of the site and of the type of turbine is given, and the power generation data are given for the month in question together with the total production in 2000 and 2001. Also the data of operation start are given. On the map of Denmark the sites of the wind turbines are marked. (SM)

  16. Wind electric power generation

    International Nuclear Information System (INIS)

    Koch, M.K.; Wind, L.; Canter, B.; Moeller, T.

    2001-01-01

    The monthly statistics of wind electric power generation in Denmark are compiled from information given by the owners of the private wind turbines. For each wind turbine the name of the site and of the type of turbine is given, and the power generation data are given for the month in question together with the total production in 1999 and 2000. Also the data of operation start are given. On the map of Denmark the sites of the wind turbines are marked. (CLS)

  17. The politics of power: Electricity reform in India

    International Nuclear Information System (INIS)

    Joseph, Kelli L.

    2010-01-01

    Ongoing theft, corruption, and an artificially decreased pricing structure have made it nearly impossible for the state utilities in India to improve power service. As a result, industrial consumers across India exit the state-run system and rely on their own on-site power generation in order to ensure a consistent and reliable source of electricity. The 2003 Electricity Act encourages further power production from these captive plants through its open access clause. By encouraging the growth of these captive power plants, politicians in India set up a dual-track economy, whereby state-run and market-run production exist side-by-side. This strategy allows politicians to encourage private sector involvement in the electricity market, without jeopardizing the support of key political constituencies at the state level.

  18. Method of electric powertrain matching for battery-powered electric cars

    Science.gov (United States)

    Ning, Guobao; Xiong, Lu; Zhang, Lijun; Yu, Zhuoping

    2013-05-01

    The current match method of electric powertrain still makes use of longitudinal dynamics, which can't realize maximum capacity for on-board energy storage unit and can't reach lowest equivalent fuel consumption as well. Another match method focuses on improving available space considering reasonable layout of vehicle to enlarge rated energy capacity for on-board energy storage unit, which can keep the longitudinal dynamics performance almost unchanged but can't reach lowest fuel consumption. Considering the characteristics of driving motor, method of electric powertrain matching utilizing conventional longitudinal dynamics for driving system and cut-and-try method for energy storage system is proposed for passenger cars converted from traditional ones. Through combining the utilization of vehicle space which contributes to the on-board energy amount, vehicle longitudinal performance requirements, vehicle equivalent fuel consumption level, passive safety requirements and maximum driving range requirement together, a comprehensive optimal match method of electric powertrain for battery-powered electric vehicle is raised. In simulation, the vehicle model and match method is built in Matlab/simulink, and the Environmental Protection Agency (EPA) Urban Dynamometer Driving Schedule (UDDS) is chosen as a test condition. The simulation results show that 2.62% of regenerative energy and 2% of energy storage efficiency are increased relative to the traditional method. The research conclusions provide theoretical and practical solutions for electric powertrain matching for modern battery-powered electric vehicles especially for those converted from traditional ones, and further enhance dynamics of electric vehicles.

  19. Liberalization of power generation sector in the Croatian electricity market

    International Nuclear Information System (INIS)

    Viskovic, Alfredo

    2005-01-01

    The electricity market liberalization and the restructuring of power utilities eventually leads to the establishment of a single electricity market in Europe, which is especially important for efficiency gains in electricity generation coupled with increased security of supply, economic competitiveness and fulfillment of environmental requirements. The European electricity market Directives as well as the Energy Community Treaty for South East Europe (legislative Menu) have remarkable impact on the restructuring of the Croatian power sector and the development of electricity generation. The Croatian model of restructuring includes legal un bundling (in the ownership of one holding company - Hrvatska Elektroprivreda (HEP)). The operation of HEP Group and its subsidiaries in the conditions of partially opened electricity market in an important element that shapes the interactions of competitive activities and regulated activities in the environment influenced by exogenous factors a thirteen percent electricity are controlled by the Energy Market Operator (MO), the Transmission System Operator (TSO) and the Energy Regulatory Agency (CERA). The introduction of eligible procedures and newly created operative procedures for power system operation, are creating completely new conditions for competition in the power generation sector, where almost all power plants are owned by HEP. New generating capacities in Croatia can be built through tendering and licensing procedures carried out by the Regulator. Electricity prices are still regulated by the Government (below the cost reflective level), there is a small share of industrial consumers and the annual electricity production is 12 TWh, with relatively large share of hydro plants. All these have implications on the development of the power generation sector in Croatia as well as on electricity market operation. The subject matter of this paper is an impact of power system restructuring and electricity market opening on the

  20. Optimization of portfolio of contracts for companies of electric power generation

    International Nuclear Information System (INIS)

    Gunn, Laura Keiko; Silva, Elisa Bastos; Correia, Paulo de Barros

    2010-01-01

    Portfolio optimization is a technique widely used to select investments in economic and financial zones. In the Brazilian Electric Market the portfolio models must consider not only different types of contracts used in the free market, but also different types of markets: the free market, the captive market and the spot market. Normally, the question is knowing which proportion of energy should be sold in each market, in order to maximize the return and minimize the risk. This article deals with a problem from the point of view of a power generator, where their objective is to maximize its profit, to serve their obligations regarding the delivery of energy and minimizing the risk associated with the occurrence of Spot Price - minimum (Spot Price). It is considered that the generator has flexible contracts and inflexible contracts to sell the energy. Inflexible contracts have delivery obligations of fixed energy and flexible contracts allow, the holder of the flexibility, to deliver or to receive an amount of variable energy. In this case, the holder of flexibility may be the purchaser or the generator. (author)

  1. Scenarios for low carbon and low water electric power plant ...

    Science.gov (United States)

    In the water-energy nexus, water use for the electric power sector is critical. Currently, the operational phase of electric power production dominates the electric sector's life cycle withdrawal and consumption of fresh water resources. Water use associated with the fuel cycle and power plant equipment manufacturing phase is substantially lower on a life cycle basis. An outstanding question is: how do regional shifts to lower carbon electric power mixes affect the relative contribution of the upstream life cycle water use? To test this, we examine a range of scenarios comparing a baseline with scenarios of carbon reduction and water use constraints using the MARKet ALlocation (MARKAL) energy systems model with ORD's 2014 U.S. 9-region database (EPAUS9r). The results suggest that moving toward a low carbon and low water electric power mix may increase the non-operational water use. In particular, power plant manufacturing water use for concentrating solar power, and fuel cycle water use for biomass feedstock, could see sharp increases under scenarios of high deployment of these low carbon options. Our analysis addresses the following questions. First, how does moving to a lower carbon electricity generation mix affect the overall regional electric power water use from a life cycle perspective? Second, how does constraining the operational water use for power plants affect the mix, if at all? Third, how does the life cycle water use differ among regions under

  2. The electric power engineering handbook power system stability and control

    CERN Document Server

    Grisby, Leonard L

    2012-01-01

    With contributions from worldwide leaders in the field, Power System Stability and Control, Third Edition (part of the five-volume set, The Electric Power Engineering Handbook) updates coverage of recent developments and rapid technological growth in essential aspects of power systems. Edited by L.L. Grigsby, a respected and accomplished authority in power engineering, and section editors Miroslav Begovic, Prabha Kundur, and Bruce Wollenberg, this reference presents substantially new and revised content. Topics covered include: * Power System Protection * Power System Dynamics and Stability *

  3. Comparison of all-electric secondary power systems for civil transport

    Science.gov (United States)

    Renz, David D.

    1992-01-01

    Three separate studies have shown operational, weight, and cost advantages for commercial subsonic transport aircraft using an all-electric secondary power system. The first study in 1982 showed that all-electric secondary power systems produced the second largest benefit compared to four other technology upgrades. The second study in 1985 showed a 10 percent weight and fuel savings using an all-electric high frequency (20 kHz) secondary power system. The last study in 1991 showed a 2 percent weight savings using today's technology (400 Hz) in an all-electric secondary power system. This paper will compare the 20 kHz and 400 Hz studies, analyze the 2 to 10 percent difference in weight savings and comment on the common benefits of the all-electric secondary power system.

  4. A hybrid electrical power system for aircraft application.

    Science.gov (United States)

    Lee, C. H.; Chin, C. Y.

    1971-01-01

    Possible improvements to present aircraft electrical power systems for use in future advanced types of aircraft have been investigated. The conventional power system is examined, the characteristics of electric loads are reviewed, and various methods of power generation and distribution are appraised. It is shown that a hybrid system, with variable-frequency generation and high-voltage dc distribution, could overcome some of the limitations of the conventional system.

  5. 77 FR 39689 - Application To Export Electric Energy; Dynasty Power, Inc.

    Science.gov (United States)

    2012-07-05

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-385] Application To Export Electric Energy; Dynasty Power.... SUMMARY: Dynasty Power, Inc. (Dynasty Power) has applied for authority to transmit electric energy from... an application from Dynasty Power for authority to transmit electric energy from the United States to...

  6. 75 FR 6369 - Application To Export Electric Energy; Aquilon Power Ltd.

    Science.gov (United States)

    2010-02-09

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-361] Application To Export Electric Energy; Aquilon Power.... SUMMARY: Aquilon Power Ltd. (Aquilon Power) has applied for authority to transmit electric energy from the... received an application from Aquilon Power for authority to transmit electric energy from the United States...

  7. A Survey of the Hazards to Electrical Power Systems

    International Nuclear Information System (INIS)

    Johnson, Gary

    2015-01-01

    This paper presents the preliminary results of a survey of severe accidents and the lessons learned that are important to the design of electrical power systems. This survey of historical accidents since 1952 identified 19 known incidents in which significant fuel melt occurred within a reactor core. In each of these incidents unexpected events or event sequences played an important role. In all cases the event sequences resulted in bypass of two or more levels of defense in depth. This study offers clear lessons for electrical power robustness: 1) Robust design must be based upon a clear understanding of what can go wrong, and 2) Robust design will reduce, but cannot eliminate, the potential for failure of electrical power systems. In order to better understand 'what is the worst that can happen' known hazards are reviewed to identify the challenges that they can present to electrical power systems. Recognizing that unexpected events cannot always be prevented the paper discusses the need for methods to restore plant power sources or provide for alternate power supplies when the plant power sources fail. (authors)

  8. Electrical Power Conversion of River and Tidal Power Generator

    Energy Technology Data Exchange (ETDEWEB)

    Muljadi, Eduard; Gevorgian, Vahan; Wright, Alan; Donegan, James; Marnagh, Cian; McEntee, Jarlath

    2016-11-21

    As renewable generation has become less expensive during recent decades, and it becomes more accepted by the global population, the focus on renewable generation has expanded to include new types with promising future applications, such as river and tidal generation. Although the utilization of power electronics and electric machines in industry is phenomenal, the emphasis on system design is different for various sectors of industry. In precision control, robotics, and weaponry, the design emphasis is on accuracy and reliability with less concern for the cost of the final product. In energy generation, the cost of energy is the prime concern; thus, capital expenditures (CAPEX) and operations and maintenance expenditures (OPEX) are the major design objectives. This paper describes the electrical power conversion aspects of river and tidal generation. Although modern power converter control is available to control the generation side, the design was chosen on the bases of minimizing the CAPEX and OPEX; thus, the architecture is simple and modular for ease of replacement and maintenance. The power conversion is simplified by considering a simple diode bridge and a DC-DC power converter to take advantage of abundant and low-cost photovoltaic inverters that have well-proven grid integration characteristics (i.e., the capability to produce energy with good power quality and control real power and voltage on the grid side).

  9. A data seamless interaction scheme between electric power secondary business systems

    Science.gov (United States)

    Ai, Wenkai; Qian, Feng

    2018-03-01

    At present, the data interaction of electric power secondary business systems is very high, and it is not universal to develop programs when data interaction is carried out by different manufacturers' electric power secondary business systems. There are different interaction schemes for electric power secondary business systems with different manufacturers, which lead to high development cost, low reusability and high maintenance difficulty. This paper introduces a new data seamless interaction scheme between electric power secondary business systems. The scheme adopts the international common Java message service protocol as the transmission protocol, adopts the common JavaScript object symbol format as the data interactive format, unified electric power secondary business systems data interactive way, improve reusability, reduce complexity, monitor the operation of the electric power secondary business systems construction has laid a solid foundation.

  10. Electrical Insulation of 500-m High-Tc Superconducting Power Cable

    International Nuclear Information System (INIS)

    Takahashi, T; Ichikawa, M; Suzuki, H; Okamoto, T; Akita, S; Mukoyama, S; Yagi, M; Maruyama, S; Kimura, A

    2006-01-01

    Electrical insulation is one of the essential technologies for the electric power apparatus. Determination of testing voltages and design method of the electrical insulation layer are inextricably linked each other, and are critical to developing and realizing a cold dielectric (CD) type high-Tc superconducting (HTS) power cable. The authors had proposed the electrical insulation design method with concepts of partial discharge-free designs for ac voltage condition. This paper discusses the testing voltages for a 77 kV 1000 A HTS power cable with a length of 500 m, and describes results of various voltage withstand test. As a result, it is concluded that the proposed electrical insulation design method is appropriate for the HTS power cable

  11. Influence of wind power, plug-in electric vehicles, and heat storages on power system investments

    DEFF Research Database (Denmark)

    Kiviluoma, Juha; Meibom, Peter

    2010-01-01

    Due to rising fuel costs, the substantial price for CO2 emissions and decreasing wind power costs, wind power might become the least expensive source of power for an increasing number of power systems. This poses the questions of how wind power might change optimal investments in other forms...... of power production and what kind of means could be used to increase power system flexibility in order to incorporate the variable power production from wind power in a cost-effective manner. We have analysed possible effects using an investment model that combines heat and power production and simulates...... electric vehicles. The model runs in an hourly time scale in order to accommodate the impact of variable power production from wind power. Electric vehicles store electricity for later use and can thus serve to increase the flexibility of the power system. Flexibility can also be upgraded by using heat...

  12. Research on spacecraft electrical power conversion

    Science.gov (United States)

    Wilson, T. G.

    1983-01-01

    The history of spacecraft electrical power conversion in literature, research and practice is reviewed. It is noted that the design techniques, analyses and understanding which were developed make today's contribution to power computers and communication installations. New applications which require more power, improved dynamic response, greater reliability, and lower cost are outlined. The switching mode approach in electronic power conditioning is discussed. Technical aspects of the research are summarized.

  13. High to ultra-high power electrical energy storage.

    Science.gov (United States)

    Sherrill, Stefanie A; Banerjee, Parag; Rubloff, Gary W; Lee, Sang Bok

    2011-12-14

    High power electrical energy storage systems are becoming critical devices for advanced energy storage technology. This is true in part due to their high rate capabilities and moderate energy densities which allow them to capture power efficiently from evanescent, renewable energy sources. High power systems include both electrochemical capacitors and electrostatic capacitors. These devices have fast charging and discharging rates, supplying energy within seconds or less. Recent research has focused on increasing power and energy density of the devices using advanced materials and novel architectural design. An increase in understanding of structure-property relationships in nanomaterials and interfaces and the ability to control nanostructures precisely has led to an immense improvement in the performance characteristics of these devices. In this review, we discuss the recent advances for both electrochemical and electrostatic capacitors as high power electrical energy storage systems, and propose directions and challenges for the future. We asses the opportunities in nanostructure-based high power electrical energy storage devices and include electrochemical and electrostatic capacitors for their potential to open the door to a new regime of power energy.

  14. Systems and methods for an integrated electrical sub-system powered by wind energy

    Science.gov (United States)

    Liu, Yan [Ballston Lake, NY; Garces, Luis Jose [Niskayuna, NY

    2008-06-24

    Various embodiments relate to systems and methods related to an integrated electrically-powered sub-system and wind power system including a wind power source, an electrically-powered sub-system coupled to and at least partially powered by the wind power source, the electrically-powered sub-system being coupled to the wind power source through power converters, and a supervisory controller coupled to the wind power source and the electrically-powered sub-system to monitor and manage the integrated electrically-powered sub-system and wind power system.

  15. On-site electric power source facility for Japanese nuclear power plant

    International Nuclear Information System (INIS)

    Oohara, T.

    1986-01-01

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  16. On-site electric power source facility for Japanese nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Oohara, T. [Incident/Failure Analysis and Evaluation Office, Nuclear Power Safety Information Research Centre, Nuclear Power Engineering Test Centre, 2nd Floor, Shuwa-Kamiyacho Bldg., 3-13, 4-Chome, Toranomon Minato-ku, Tokyo 105 (Japan)

    1986-02-15

    Trends of construction of nuclear power plants in Japan, occurrence rate of incidents/failures of electric facilities, major example of incidents/failures, their countermeasure to prevent recurrence are introduced. Furthermore, safety administration system of the Government, electric utilities and manufacturers, and various countermeasures to prevent incident/ failure of electrical facilities from the hardware and software sides are discussed. (author)

  17. Advanced simulation of windmills in electric power supply

    DEFF Research Database (Denmark)

    Akhmatov, Vladislav; Knudsen, Hans; Nielsen, Arne Hejde

    2000-01-01

    -connected windmills as a part of realistic electrical grid models. That means an arbitrary number of wind farms or single windmills within an arbitrary network configuration. The windmill model may be applied to study of electric power system stability and of power quality as well. It is found that a grid...

  18. Outline of electric power installation plan for fiscal 1981

    International Nuclear Information System (INIS)

    Murakami, Masami

    1981-01-01

    The electric power installation plan for fiscal 1981 was submitted by power companies to the Minister of International Trade and Industry at the end of March. In 1990, the total demand of electric power will be 907.9 billion kWh, and the yearly rate of growth will be about 5%. The peak demand of electric power continues to be acute, and is expected to be 175.74 million kW. In order to supply power so as to always balance the demand, the reserve power of 8 to 10% of the maximum demand is required. According to the submitted plan, the power sources determined already are not sufficient, therefore it was planned to present 61 plants of 11.94 million kW in 1981 and 64 plants of 19.61 million kW in 1982 to the Power Source Development Coordination Council. If the power source development progresses as planned, the adequate rate to reserve is maintained up to 1990, and the stable supply of electric power seems to be secured. However when some delay occurs in the plan, serious obstacle to the demand and supply may arise. This plan fundamentally follows the policy to deversify power sources toward the target of substitute energy supply for petroleum. The power transmission facilities are also strengthened and expanded. The investment plan for fiscal 1981 is shown. (Kako, I.)

  19. Optimal electricity market for wind power

    International Nuclear Information System (INIS)

    Holttinen, H.

    2005-01-01

    This paper is about electricity market operation when looking from the wind power producers' point of view. The focus in on market time horizons: how many hours there is between the closing and delivering the bids. The case is for the Nordic countries, the Nordpool electricity market and the Danish wind power production. Real data from year 2001 was used to study the benefits of a more flexible market to wind power producer. As a result of reduced regulating market costs from better hourly predictions to the market, wind power producer would gain up to 8% more if the time between market bids and delivery was shortened from the day ahead Elspot market (hourly bids by noon for 12-36 h ahead). An after sales market where surplus or deficit production could be traded 2 h before delivery could benefit the producer almost as much, gaining 7%

  20. The role of the decomissioning process on the development of the Brazilian nuclear program

    International Nuclear Information System (INIS)

    Mattos, Joao Roberto L. de; Dias, Marcio S.

    2009-01-01

    The National Energy Plan 2030, issued by the Energy Research Company of the Brazilian Ministry of Mines and Energy (EPE, 2007), formalized a reference scenario for the renaissance of the nuclear option in Brazil. This scenario includes the completion of Angra 3 Nuclear Power Plant up to 2014 and the construction of four additional nuclear power plants of 1000 MWe: a fourth unit by 2020, a fifth unit by 2025 and the sixth and seventh plants by 2030. Worldwide, the energy demand and the renaissance of nuclear energy as a primary source for electric power generation are leading the industry toward new constructions as well as uprates and operational life extensions. In this new scenario the decommissioning is pushed further into the future and Brazil is not an exception, considering that Angra 1 NPP is under a process of uprating and certainly will apply for and will receive license renewals allowing its operation for 20 or more years beyond its original project. Thus, why to focus on decommissioning in the present? What is the importance of decommissioning for the development of the Brazilian nuclear industry considering the existing reactors? Should the decommissioning be considered in the design of the new nuclear power plants? What would be the decommissioning plan for the Brazilian Nuclear Power Plants? The present paper is intended to contextualize the decommissioning in the present scenarios as well as to try to answer the above questions. (author)

  1. Market power in electricity markets: Beyond concentration measures

    International Nuclear Information System (INIS)

    Borenstein, S.; Bushnell, J.; Knittel, C.R.

    1999-01-01

    The wave of electricity market restructuring both within the US and abroad has brought the issue of horizontal market power to the forefront of energy policy. Traditionally, estimation and prediction of market power has relied heavily on concentration measures. In this paper, the authors discuss the weaknesses of concentration measures as a viable measure of market power in the electricity industry, and they propose an alternative method based on market simulations that take advantage of existing plant level data. The authors discuss results from previous studies they have performed, and present new results that allow for the detection of threshold demand levels where market power is likely to be a problem. In addition, the authors analyze the impact of that recent divestitures in the California electricity market will have on estimated market power. They close with a discussion of the policy implications of the results

  2. Expert System Applications for the Electric Power Industry: Proceedings

    International Nuclear Information System (INIS)

    1992-06-01

    A conference on Expert System Applications for the Electric Power Industry was held in Boston on September 8--11, 1991 to provide a forum for technology transfer, technical information exchange, and education. The conference was attended by more than 150 representatives of electric utilities, equipment manufacturers, engineering consulting organizations, universities, national laboratories, and government agencies. The meeting included a keynote address, 70 papers, and 18 expert system demonstrations. Sessions covered expert systems in power system planning operations, fossil power plant applications, nuclear power plant applications, and intelligent user interfaces. The presentations showed how expert systems can provide immediate benefits to the electric power industry in many applications. Individual papers are indexed separately

  3. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-11-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

  4. Optimal Operation of Plug-In Electric Vehicles in Power Systems with High Wind Power Penetrations

    DEFF Research Database (Denmark)

    Hu, Weihao; Su, Chi; Chen, Zhe

    2013-01-01

    in the power systems with high wind power penetrations. In this paper, the integration of plug-in electric vehicles in the power systems with high wind power penetrations is proposed and discussed. Optimal operation strategies of PEV in the spot market are proposed in order to decrease the energy cost for PEV......The Danish power system has a large penetration of wind power. The wind fluctuation causes a high variation in the power generation, which must be balanced by other sources. The battery storage based Plug-In Electric Vehicles (PEV) may be a possible solution to balance the wind power variations...... owners. Furthermore, the application of battery storage based aggregated PEV is analyzed as a regulation services provider in the power system with high wind power penetrations. The western Danish power system where the total share of annual wind power production is more than 27% of the electrical energy...

  5. Independent operation by subsystems: Strategic behavior for the Brazilian electricity sector

    International Nuclear Information System (INIS)

    Guido Tapia Carpio, Lucio; Olimpio Pereira, Amaro

    2006-01-01

    This article describes the competitive strategies of the subsystems in the Brazilian electricity sector. The objective is to present a model in which the operation of each subsystem is managed independently. As the subsystems correspond to the country's geographic regions, the adoption of this model creates conditions for each region to develop according to its own peculiarities. The decision-making process is described based Game Theory. As such, the players or operators of each subsystem carry out their strategies based on the quantities produced, which results in Nash-Cournot equilibrium. In this model, the importance of the proper transmission line dimensioning is highlighted. It determines the competition level among subsystems and allows for optimization of the whole system without requiring arrangements for managing the congestion of the energy transportation grid. The model was programmed in FORTRAN, using IBM's optimization subroutine library (OSL) package

  6. Electric Power Monthly, June 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-13

    The EPM is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 40 tabs.

  7. Northwest conservation and electric power plan 1986. Volume I

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    This 20 year plan is prepared in accordance with the Pacific Northwest Electric Power Planning and Conservation Act - Public Law 96-501, of 1980. This Act required the Council to develop and adopt a 20-year electrical power plan for the region with a program to protect, mitigate and enhance the fish and wildlife affected by hydroelectric development in the Columbia River Basin. The plan provides a 25 year history of the regions power development and comments on its unique features and changing nature. Presentations covers problems, solutions and the planning strategy for risk management. The existing electrical power system is discussed along with future electricity needs, generating resources, conservation of resources, regional needs and resources, and the 1986 action plan. Underlying details are provided in Volume II

  8. Analysis for Large Scale Integration of Electric Vehicles into Power Grids

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Wang, Xiaoru

    2011-01-01

    Electric Vehicles (EVs) provide a significant opportunity for reducing the consumption of fossil energies and the emission of carbon dioxide. With more and more electric vehicles integrated in the power systems, it becomes important to study the effects of EV integration on the power systems......, especially the low and middle voltage level networks. In the paper, the basic structure and characteristics of the electric vehicles are introduced. The possible impacts of large scale integration of electric vehicles on the power systems especially the advantage to the integration of the renewable energies...... are discussed. Finally, the research projects related to the large scale integration of electric vehicles into the power systems are introduced, it will provide reference for large scale integration of Electric Vehicles into power grids....

  9. Electrical Power Systems Protection and Interdependencies with ICT

    OpenAIRE

    Milis, George; Kyriakides, Elias; Hadjiantonis, Antonis

    2017-01-01

    The present chapter discusses the issue of protection of the electrical power systems, addressing all dimensions, from the need of protection to the identified faults and disturbances to the available protection schemes and further considerations, also looking at the challenges brought by recognizing the interdependent nature of the today’s electrical power systems.

  10. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-06-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the EMF (electric and magnetic fields) produced by power lines and other electrical devices affect our health. Although no adverse health effects of electric power EMF have been confirmed, there is continued scientific uncertainty about this issue. Research on EMF is ongoing throughout the world. The purpose of this booklet is to answer some common questions that the BPA (Bonneville Power Administration) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  11. Wind power and a liberalised North European electricity exchange

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, L H; Morthorst, P E; Skytte, K [and others

    1999-03-01

    Conditions for wind power on a liberalised North European electrical power market are addressed in the paper. Results are presented from a recently completed study carried out by Risoe National Laboratory in collaboration with the Danish electric utilities Eltra, Elsam and Elkraft. A main result from the study is, that the market will be able to provide the necessary power regulation, that will be required year 2005 as consequence of the expected wind power capacity extension, according to the Danish energy plan, Energy21. The averege sales price on the market for the wind-generated electricity is less than the average spot market price, due to provision of power regulation to balance the unpredictability of the wind power. This reduction in the market value of wind power has been calculated to 10-20 DKK/MWh of 1.3-2.7 EUR/MWh. (au)

  12. Customized electric power storage device for inclusion in a collective microgrid

    Science.gov (United States)

    Robinett, III, Rush D.; Wilson, David G.; Goldsmith, Steven Y.

    2016-02-16

    An electric power storage device is described herein, wherein the electric power storage device is included in a microgrid. The electric power storage device has at least one of a charge rate, a discharge rate, or a power retention capacity that has been customized for a collective microgrid. The collective microgrid includes at least two connected microgrids. The at least one of the charge rate, the discharge rate, or the power retention capacity of the electric power storage device is computed based at least in part upon specified power source parameters in the at least two connected microgrids and specified load parameters in the at least two connected microgrids.

  13. Nuclear electric power safety, operation, and control aspects

    CERN Document Server

    Knowles, J Brian

    2013-01-01

    Assesses the engineering of renewable sources for commercial power generation and discusses the safety, operation, and control aspects of nuclear electric power From an expert who advised the European Commission and UK government in the aftermath of Three Mile Island and Chernobyl comes a book that contains experienced engineering assessments of the options for replacing the existing, aged, fossil-fired power stations with renewable, gas-fired, or nuclear plants. From geothermal, solar, and wind to tidal and hydro generation, Nuclear Electric Power: Safety, Operation, and Control Aspects ass

  14. The nuclear power electricity an opportunity for Mexico. Final report

    International Nuclear Information System (INIS)

    Fernandez de la Garza, R.; Garcia, C. F.; Trejo R, S.; Zazueta R, T.; Castaneda G, M. A.; Cruz B, H. J.; Mercado V, J. J.

    2009-01-01

    Inside this document the outstanding information is presented included in the report that develops the technical, financial, environmental and social aspects to consider for the incorporation from a new power plant to the national interconnected system, which was elaborated and presented to the nuclear power plant of Laguna Verde in August of 2009. The treated topics are: the nuclear power electricity, the experience of Laguna Verde, advanced reactors to consider for a new nuclear power plant, environmental aspects, costs of a new nuclear power plant, financing, socioeconomic impact. This work was prepared to evaluate the feasibility of building a new unit of nuclear power plant in Mexico before the evident resurgence at world level of use of nuclear energy to generate electricity. It is important that Mexico maintains inside its development programs and construction, to the nuclear power electricity like a viable and sure alternative of generating electricity, being able to take advantage of experience won with the operation of Laguna Verde, allowing that the country has diverse technologies for electricity generation and have technical capacity to manage the tip technology. (Author)

  15. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-05-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this booklet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  16. The effect of electric transmission constraints on how power generation companies bid in the Colombian electrical power market

    Directory of Open Access Journals (Sweden)

    Luis Eduardo Gallego Vega

    2010-05-01

    Full Text Available This paper presents the results of research about the effect of transmission constraints on both expected electrical energy to be dispatched and power generation companies’ bidding strategies in the Colombian electrical power market. The proposed model simulates the national transmission grid and economic dispatch by means of optimal power flows. The proposed methodology allows structural problems in the power market to be analyzed due to the exclusive effect of trans- mission constraints and the mixed effect of bidding strategies and transmission networks. A new set of variables is proposed for quantifying the impact of each generation company on system operating costs and the change in expected dispatched energy. A correlation analysis of these new variables is presented, revealing some interesting linearities in some generation companies’ bidding patterns.

  17. Electrolysis: Information and Opportunities for Electric Power Utilities

    Energy Technology Data Exchange (ETDEWEB)

    Kroposki, B.; Levene, J.; Harrison, K.; Sen, P.K.; Novachek, F.

    2006-09-01

    Recent advancements in hydrogen technologies and renewable energy applications show promise for economical near- to mid-term conversion to a hydrogen-based economy. As the use of hydrogen for the electric utility and transportation sectors of the U.S. economy unfolds, electric power utilities need to understand the potential benefits and impacts. This report provides a historical perspective of hydrogen, discusses the process of electrolysis for hydrogen production (especially from solar and wind technologies), and describes the opportunities for electric power utilities.

  18. Ethics on the TEPCO bankruptcy, nuclear power plants and regulatory reform in the electric power industry

    International Nuclear Information System (INIS)

    Koga, Shigeaki

    2013-01-01

    Although regulatory reform in the electric power industry had been considered as part of social system reform like in the finance and communications to liberalize the market, there still continued to exist regional monopoly, integrated system for power generation, transmission and distribution, and lack of competition. The Fukushima accident showed such electric power system was unethical as social system compared to ordinary industries, because electric power company getting profit could not be prepared for nuclear damage liability and would burden third unrelated parties with risk. Electric power company should be forced to insure nuclear power plants for nuclear accidents. Otherwise restart of nuclear power plant operation should not be allowed. Nuclear power had been justified to be entitled grant or subsidy from the government for public good, which would be unfair to people. This article presented speeding-up scheme of Fukushima accident treatment leading to TEPCO bankruptcy and discussed measures against concerns or comments about bankruptcy procedures, major part of which might be mitigation of fund-raising fear by government support. At the proceeding of bankruptcy procedure including spinning off of separate companies, regulatory reform in the electric power industry could be taken in advanced. (T. Tanaka)

  19. ASSESSMENT OF THE ELECTRIC POWER QUALITY ON THE POLISH FISHING BOATS

    Directory of Open Access Journals (Sweden)

    Dariusz TARNAPOWICZ

    2015-07-01

    Full Text Available Power quality is an important problem for electrical systems. Electricity receivers should operate at nominal conditions. Each deviation from nominal values may cause the malfunction of electrical devices, decreasing their durability and per-manently damage the appliance. The importance of electric power quality for technical systems and individual electrical devices on fishing boats is fundamental. Utilization of equipment powered by electrical energy with a reduced quality resulting in economical losses and the treat to the screw's safety. Researches of the electrical energy's quality were carried out almost any type of fishing boats. This article presents the results of researches concerning the quality of electrical energy performed on a representative type of fishing boats. It shortly evaluates the results of tests and suggests solutions to improve the power quality parameters.

  20. Auction development for the price-based electric power industry

    Science.gov (United States)

    Dekrajangpetch, Somgiat

    The restructuring of the electric power industry is to move away from the cost-based monopolistic environment of the past to the priced-based competitive environment. As the electric power industry is restructuring in many places, there are still many problems that need to be solved. The work in this dissertation contributes to solve some of the electric power auction problems. The majority of this work is aimed to help develop good markets. A LaGrangian relaxation (LR) Centralized Daily Commitment Auction (CDCA) has been implemented. It has been shown that the solution might not be optimal nor fair to some generation companies (GENCOs) when identical or similar generating units participate in a LR CDCA based auction. Supporting information for bidding strategies on how to change unit data to enhance the chances of bid acceptance has been developed. The majority of this work is based on Single Period Commodity Auction (SPCA). Alternative structures for the SPCA are outlined. Whether the optimal solution is degenerated is investigated. Good pricing criteria are summarized and the pricing method following good pricing criteria is developed. Electricity is generally considered as a homogeneous product. When availability level is used as additional characteristic to distinct electricity, electricity can be considered a heterogeneous product. The procedure to trade electricity as a heterogeneous product is developed. The SPCA is formulated as a linear program. The basic IPLP algorithm has been extended so that sensitivity analysis can be performed as in the simplex method. Sensitivity analysis is used to determine market reach. Additionally, sensitivity analysis is used in combination with the investigation of historical auction results to provide raw data for power system expansion. Market power is a critical issue in electric power deregulation. Firms with market power have an advantage over other competitor firms in terms of market reach. Various approaches to

  1. 49 CFR 1242.19 - Electric power systems (account XX-19-21).

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Electric power systems (account XX-19-21). 1242.19... Structures § 1242.19 Electric power systems (account XX-19-21). Separate common expenses on basis of common expenses of electric power purchased or produced for motive power (accounts XX-51-68 and XX-52-68). ...

  2. 78 FR 13097 - Electric Power Research Institute; Seismic Evaluation Guidance

    Science.gov (United States)

    2013-02-26

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0038] Electric Power Research Institute; Seismic... Electric Power Research Institute (EPRI)-1025287, ``Seismic Evaluation Guidance: Screening, Prioritization... guidance and clarification of an acceptable approach to assist nuclear power reactor licensees when...

  3. Wind electric power generation

    International Nuclear Information System (INIS)

    Groening, B.; Koch, M.; Canter, B.; Moeller, T.

    1995-01-01

    The monthly statistics of wind electric power generation in Denmark are compiled from information given by the owners of private wind turbines. For each wind turbine the name of the site and of the type of turbine is given, and the power generation data are given for the month in question together with the total production in 1988 and 1989. Also the data of operation start are given. On the map of Denmark the sites of the wind turbines are marked. The statistics for December 1994 comprise 2328 wind turbines

  4. Nuclear Power Plants in a Competitive Electricity Market

    International Nuclear Information System (INIS)

    Jankauskas, V.

    2002-01-01

    Electricity demand is growing in the world by an average rate of 3% and, according to the International Energy Agency, is going to keep this pace of growth for the 1st quarter of the 21st century. At the same time, the role of the nuclear in the world energy mix is diminishing, and in 2020 only 9% of the world electricity will be produced at the nuclear plants versus 17% in 2000. The main reasons for the nuclear power diminishing share in the world market are not environmental or safety problems, as one may assume, but technical and economical. Long construction time, high capital cost, huge liabilities connected with the spent nuclear fuel and radioactive waste treatment, storage and final disposal are the main factors restricting the further growth of the nuclear power. Nevertheless, in the liberalized markets (U.K., Germany, Scandinavian countries) nuclear power plants are operating rather successfully. In a short run nuclear plants may become very competitive as they have very low short-run marginal costs, but in the long run they may become very in competitive. The Ignalina NPP plays the dominant ro]e in the Lithuanian electricity market, producing more than 75% of the total domestic electricity. It produces the cheapest electricity in Lithuania, mostly due to its higher availability, than the thermal power plants. The price of electricity sold by Ignalina is also lower as it does not cover all costs connected with the future decommissioning of the plant, spent fuel storage and final disposal. If at least part of this cost were included into the selling price, Ignalina might become highly competitive in a liberalised electricity market. As the Lithuanian Electricity law requires to deregulate electricity. generation prices, these prices should be set by the market. (author)

  5. Economic evaluation and optimization of a photovoltaic-fuel cell-batteries hybrid system for use in the Brazilian Amazon

    International Nuclear Information System (INIS)

    Silva, Sergio B.; Oliveira, Marco A.G. de; Severino, Mauro M.

    2010-01-01

    The lack of electric power in isolated communities in the Brazilian Amazon region has become one of the barriers to economic and social development. Currently, the main technologies that provide electric power to these communities are diesel generators. This non-renewable energy source, besides causing serious problems to the environment and human health, have high maintenance and operational costs. This paper presents a study on the use of photovoltaic and fuel cells for continuous supply of electric power. The paper outlines the technical and costs characteristics of a pilot project set up in an environmental protection area, located in the state of Tocantins, Brazil. The pilot project uses solar energy as the primary electric power production source. Surplus energy stored in the hydrogen produced by the electrolysis of water is later transformed into electric power by the fuel cells during periods when there is little or no sunlight. A comparative study between the technologies and potential configurations meeting the needs of isolated communities in the Amazon through simulations based on HOMER software are presented. As result, this paper outlines some policies to promote the use of renewable energy sources in isolated areas in Brazil derived from the pilot project.

  6. Carbon pricing, nuclear power and electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, R.; Keppler, J. H. [OECD Nuclear Energy Agency, 12, boulevard des Iles, 92130 Issy-les-Moulineaux (France)

    2012-07-01

    In 2010, the NEA in conjunction with the International Energy Agency produced an analysis of the Projected Costs of Electricity for almost 200 power plants, covering nuclear, fossil fuel and renewable electricity generation. That analysis used lifetime costs to consider the merits of each technology. However, the lifetime cost analysis is less applicable in liberalised markets and does not look specifically at the viewpoint of the private investor. A follow-up NEA assessment of the competitiveness of nuclear energy against coal- and gas-fired generation under carbon pricing has considered just this question. The economic competition in electricity markets is today between nuclear energy and gas-fired power generation, with coal-fired power generation not being competitive as soon as even modest carbon pricing is introduced. Whether nuclear energy or natural gas comes out ahead in their competition depends on a number of assumptions, which, while all entirely reasonable, yield very different outcomes. The analysis in this study has been developed on the basis of daily data from European power markets over the last five-year period. Three different methodologies, a Profit Analysis looking at historic returns over the past five years, an Investment Analysis projecting the conditions of the past five years over the lifetime of plants and a Carbon Tax Analysis (differentiating the Investment Analysis for different carbon prices) look at the issue of competitiveness from different angles. They show that the competitiveness of nuclear energy depends on a number of variables which in different configurations determine whether electricity produced from nuclear power or from CCGTs generates higher profits for its investors. These are overnight costs, financing costs, gas prices, carbon prices, profit margins (or mark-ups), the amount of coal with carbon capture and electricity prices. This paper will present the outcomes of the analysis in the context of a liberalised

  7. Carbon pricing, nuclear power and electricity markets

    International Nuclear Information System (INIS)

    Cameron, R.; Keppler, J. H.

    2012-01-01

    In 2010, the NEA in conjunction with the International Energy Agency produced an analysis of the Projected Costs of Electricity for almost 200 power plants, covering nuclear, fossil fuel and renewable electricity generation. That analysis used lifetime costs to consider the merits of each technology. However, the lifetime cost analysis is less applicable in liberalised markets and does not look specifically at the viewpoint of the private investor. A follow-up NEA assessment of the competitiveness of nuclear energy against coal- and gas-fired generation under carbon pricing has considered just this question. The economic competition in electricity markets is today between nuclear energy and gas-fired power generation, with coal-fired power generation not being competitive as soon as even modest carbon pricing is introduced. Whether nuclear energy or natural gas comes out ahead in their competition depends on a number of assumptions, which, while all entirely reasonable, yield very different outcomes. The analysis in this study has been developed on the basis of daily data from European power markets over the last five-year period. Three different methodologies, a Profit Analysis looking at historic returns over the past five years, an Investment Analysis projecting the conditions of the past five years over the lifetime of plants and a Carbon Tax Analysis (differentiating the Investment Analysis for different carbon prices) look at the issue of competitiveness from different angles. They show that the competitiveness of nuclear energy depends on a number of variables which in different configurations determine whether electricity produced from nuclear power or from CCGTs generates higher profits for its investors. These are overnight costs, financing costs, gas prices, carbon prices, profit margins (or mark-ups), the amount of coal with carbon capture and electricity prices. This paper will present the outcomes of the analysis in the context of a liberalised

  8. Aircraft Electric/Hybrid-Electric Power and Propulsion Workshop Perspective of the V/STOL Aircraft Systems Tech Committee

    Science.gov (United States)

    Hange, Craig E.

    2016-01-01

    This presentation will be given at the AIAA Electric Hybrid-Electric Power Propulsion Workshop on July 29, 2016. The workshop is being held so the AIAA can determine how it can support the introduction of electric aircraft into the aerospace industry. This presentation will address the needs of the community within the industry that advocates the use of powered-lift as important new technologies for future aircraft and air transportation systems. As the current chairman of the VSTOL Aircraft Systems Technical Committee, I will be presenting generalized descriptions of the past research in developing powered-lift and generalized observations on how electric and hybrid-electric propulsion may provide advances in the powered-lift field.

  9. Optimal Wind Power Uncertainty Intervals for Electricity Market Operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Ying; Zhou, Zhi; Botterud, Audun; Zhang, Kaifeng

    2018-01-01

    It is important to select an appropriate uncertainty level of the wind power forecast for power system scheduling and electricity market operation. Traditional methods hedge against a predefined level of wind power uncertainty, such as a specific confidence interval or uncertainty set, which leaves the questions of how to best select the appropriate uncertainty levels. To bridge this gap, this paper proposes a model to optimize the forecast uncertainty intervals of wind power for power system scheduling problems, with the aim of achieving the best trade-off between economics and reliability. Then we reformulate and linearize the models into a mixed integer linear programming (MILP) without strong assumptions on the shape of the probability distribution. In order to invest the impacts on cost, reliability, and prices in a electricity market, we apply the proposed model on a twosettlement electricity market based on a six-bus test system and on a power system representing the U.S. state of Illinois. The results show that the proposed method can not only help to balance the economics and reliability of the power system scheduling, but also help to stabilize the energy prices in electricity market operation.

  10. Pricing Electric Power in the Czech Republic and in Selected Countries

    Directory of Open Access Journals (Sweden)

    Eva Mazegue Pavelková

    2016-01-01

    Full Text Available This paper focuses on state intervention in the pricing of electricity from renewable power sources in the Czech Republic when compared with the pricing in the Slovak Republic, Germany, France and Italy. In these countries the state intervention is implemented in different forms, but the critical part of the price is regulated everywhere by the state. The price of electricity is determined by its production costs, which depend on the source from which electricity is produced. The highest cost of electricity is required to generate renewable energy, particularly solar power, while the lowest costs of power are associated with its production by coal-fired and natural gas-fired thermal power plants. However, hydroelectric power plants attain clearly the lowest cost for generating electricity. State intervention includes supporting power generation from renewable power sources by guaranteeing purchase prices.

  11. Electric power grid interconnection in Northeast Asia

    International Nuclear Information System (INIS)

    Yun, Won-Cheol; Zhang, Zhong Xiang

    2006-01-01

    In spite of regional closeness, energy cooperation in Northeast Asia has remained unexplored. However, this situation appears to be changing. The government of South Korea seems to be very enthusiastic for power grid interconnection between the Russian Far East and South Korea to overcome difficulties in finding new sites for building power facilities to meet its need for increased electricity supplies. This paper analyzes the feasibility of this electric power grid interconnection route. The issues addressed include electricity market structures; the prospects for electric power industry restructuring in the Russian Federation and South Korea; the political issues related to North Korea; the challenges for the governments involved and the obstacles anticipated in moving this project forward; project financing and the roles and concerns from multilateral and regional banks; and institutional framework for energy cooperation. While there are many technical issues that need to be resolved, we think that the great challenge lies in the financing of this commercial project. Thus, the governments of the Russian Federation and South Korea involved in the project need to foster the development of their internal capital markets and to create confidence with international investors. To this end, on energy side, this involves defining a clear energy policy implemented by independent regulators, speeding up the already started but delayed reform process of restructuring electric power industry and markets, and establishing a fair and transparent dispute resolution mechanism in order to reduce non-commercial risks to a minimum. The paper argues that establishing a framework for energy cooperation in this region will contribute positively towards that end, although views differ regarding its specific form. Finally, given that North Korea has a crucial transit role to play and faces a very unstable political situation, it is concluded that moving the project forward needs to be

  12. Electric power distribution: in the direction of a competitive market?

    International Nuclear Information System (INIS)

    Souza, J.R.A. de.

    1993-01-01

    This paper discusses the process of electric power sector deregulation, occurred in several countries, frequently followed of privatization, which the aim is activate the competition and, consequently, the efficiency between the companies of the electric power sector. The competition in the supply market of electric power, by the Great Britain, France, Spain and United States are shown as an example of this energy policy. (C.G.C.)

  13. Electrical Power System Architectures for In-House NASA/GSFC Missions

    Science.gov (United States)

    Yun, Diane D.

    2006-01-01

    This power point presentation reviews the electrical power system (EPS) architecture used for a few NASA GSFC's missions both current and planned. Included in the presentation are reviews of electric power systems for the Space Technology 5 (ST5) mission, the Solar Dynamics Observatory (SDO) Mission, and the Lunar Reconnaissance Orbiter (LRO). There is a slide that compares the three missions' electrical supply systems.

  14. Electric utilities deregulation and its impact on nuclear power generating stations

    International Nuclear Information System (INIS)

    Trehan, N.K.

    1998-01-01

    Under restructuring and deregulation, it is not clear as to who would have the responsibility, and what obligations the market participants would have to ensure that the electrical system reliability (stability) is maintained. Due to the dynamic nature of the electrical grid, especially with the implementation of restructuring and deregulation, vulnerabilities exist which may impact the reliability (stability) of the offsite electrical power system. In a nuclear power generating unit, an offsite electric power system and an onsite electric power system are required to permit the functioning of structures, systems, and components which are important to safety. The safety function for each system is to provide sufficient capacity and capability to assure that the containment integrity is maintained during power operation or in the event of a postulated accident. Analyses performed by the applicants must verify that the electrical grid remains stable in the event of a loss of the nuclear unit generator, the largest other unit on the grid or the most critical transmission line. The stability of the electric grid is assumed in the safety analyses and a change in it would impact those analyses. However, it may impact the availability of a stable electric power to the safety buses because of the limited number of available transmission lines. This paper discusses electrical power generation and demand, reserve margins, power transfer capability, development of new innovative technologies to compensate for lack of the construction of transmission lines, legislation for the formulation of a self regulation organization (SRO), grid disturbances that may lead to a voltage collapse, and the vulnerabilities which may impact the availability of a stable power to the nuclear power generating stations

  15. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  16. Legitimising Emerging Power Diplomacy: an Analysis of Government and Media Discourses on Brazilian Foreign Policy under Lula

    Directory of Open Access Journals (Sweden)

    Rafael Mesquita

    2016-06-01

    Full Text Available Abstract This study analyses whether Brazilian foreign policy under Lula successfully legitimised the country's international identity as a rising power in the eyes of the domestic and international media. Based on a constructivist framework, we have applied French Discourse Analysis to a corpus of 36 official addresses by the President of the Republic and the Minister of Foreign Relations and 137 news articles from four news outlets, two Brazilian and two international, concerning two diplomatic episodes deemed representative of Brazil's quest for greater pre-eminence: the leadership of MINUSTAH (2004 and the Nuclear Deal signed with Iran and Turkey (2010. Results show that official discourse characterises Brazil's identity as a rising power chiefly by South-South diplomacy, while media discourse was more heterogeneous, being the discursive formation of each news outlet determinant in explaining their interpretation of Brazil's international identity.

  17. Performance issues for a changing electric power industry

    Energy Technology Data Exchange (ETDEWEB)

    1995-01-01

    Extremely cold weather created record demands for electricity in the eastern two-thirds of the United States during the week of January 16, 1994. Fuel-related problems, mostly the result of transportation constraints resulting from ice accumulation on roads and water-ways, and unexpected generating capacity outages at utilities and nonutilities resulted in demand not being met. Some utilities asked nonessential customers along with State governments and a portion of the Federal Government to shut down. Two electric control areas, the Pennsylvania-New Jersey-Maryland Interconnection (PJM) and Virginia Electric & Power Company (VEPCO), instituted rolling blackouts. This disturbance was reported widely in the press and, along with other disturbances, peaked renewed interest in the reliability of the electric power system. The renewed interest in reliability has coincided with substantial changes that are beginning to occur in the structure and competitiveness of the electric power industry. Juxtaposing the question of reliability and the issue of changing industry structure leads to the central concern of this report: What effect, if any, will the changing structure of the industry have on the reliability of the system?

  18. Electric-power economy of Japan

    International Nuclear Information System (INIS)

    Dobrochotov, V.I.; Wolfberg, D.B.

    1975-01-01

    This is a survey on a) development and present capacity of electricity-supply companies in Japan, b) the structural shift in the capacity of power plants which took place from 1966 until 1974, arranged according to thermal, nuclear and hydraulic power stations, c) the structural shift in the use of fossile fuels, also from 1966 until 1974, d) the major thermal and nuclear power stations and pump storage plants under construction and in operation, e) interconnected operation. The survey ends with the development study of the Japanese Government being outlined. (GG/LN) [de

  19. Optimal contracts for wind power producers in electricity markets

    KAUST Repository

    Bitar, E.; Giani, A.; Rajagopal, R.; Varagnolo, D.; Khargonekar, P.; Poolla, K.; Varaiya, P.

    2010-01-01

    This paper is focused on optimal contracts for an independent wind power producer in conventional electricity markets. Starting with a simple model of the uncertainty in the production of power from a wind turbine farm and a model for the electric

  20. Consequences of reduced production of electricity in nuclear power plants

    International Nuclear Information System (INIS)

    The Swedish Power Administration has assessed the possibilities of expanding electric power sources other than nuclear power plants for the years 1980 and 1985. Reports on costs in the form of loss of capital and increased operating costs involved in the dismantling of nuclear power plants are made in Supplement 1. The economics division of the Finance Department, starting with a long-range study model of the Swedish economy, has calculated the consequences of a cutback in electric power up to 1980 for Sweden's economy and employment in that year. The consequences of reduction of electricity supplies up to 1985 are summarized in Supplement 2 in this report. It is concluded that in order to be able to manage the problem of supplying electricity by 1985, it will be necessary to increase oil power above what was assumed in the energy policy program. There will have to be new oil-based power as well. According to the Power Administration, oil-power facilities can be expanded to varying degrees, depending upon when the decision is made. The Power Administration's calculations show that 125 TWh is possible in 1985 without nuclear power only if a decision for discontinuation is made in the fall of 1976. This is based on very optimistic assumptions about the time of execution of a program for oil-steam operation, and also on the assumption that extreme measures will be initiated to force expansion of both district-heating distribution and power + heat facilities. Oil consumption for production of electricity in such an electric power system would be about 9 million m 3 , which is about 5 times more than at present and about one-third of the present total consumption of petroleum products in Sweden

  1. Electrical-Loss Analysis of Power-Split Hybrid Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Andrea Bonfiglio

    2017-12-01

    Full Text Available The growing development of hybrid electric vehicles (HEVs has seen the spread of architectures with transmission based on planetary gear train, realized thanks to two electric machines. This architecture, by continuously regulating the transmission ratio, allows the internal combustion engine (ICE to work in optimal conditions. On the one hand, the average ICE efficiency is increased thanks to better loading situations, while, on the other hand, electrical losses are introduced due to the power circulation between the two electrical machines mentioned above. The aim of this study is then to accurately evaluate electrical losses and the average ICE efficiency in various operating conditions and over different road missions. The models used in this study are presented for both the Continuously Variable Transmission (CVT architecture and the Discontinuously Variable Transmission (DVT architecture. In addition, efficiency maps of the main components are shown. Finally, the simulation results are presented to point out strengths and weaknesses of the CVT architecture.

  2. Switching conditions in the electric power system

    International Nuclear Information System (INIS)

    Tsukushi, M.; Hirasawa, K.; Kurosawa, Y.

    1991-01-01

    This paper reports that a circuit breaker must be capable of making, carrying, and interrupting the current under both normal and abnormal conditions, especially in the case of a short-circuit fault. Before installing a circuit breaker, it is necessary to estimate the maximum short-circuit current that can occur in the electric power system and then select a circuit breaker that can interrupt and make the estimated current. Many types of short-circuit faults occur in electric power systems

  3. Privatisation electric power sector in Pakistan: some important issues

    International Nuclear Information System (INIS)

    Ghafoor, A.; Weiss, J.

    1998-01-01

    This discussion paper highlights important issues relating to the privatisation of Pakistan's electric power sector. Salient features of the electric power sector in Pakistan, factors affecting the economic performance of this sector, the partial privatisation policy adopted by Pakistan, ongoing private power projects, and current privatisation policy are examined. The arguments for competition are raised, and alternative policy reforms the are considered

  4. Hydro-electric power - potential and limitations

    Energy Technology Data Exchange (ETDEWEB)

    Amundsen, T.

    1995-12-31

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world`s growing population, the unavoidable conclusion is that more power is to be produced. 3 figs.

  5. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  6. Design study of electrical power supply system for tokamak fusion power reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Design study of the electrical power supply system for a 2000MWt Tokamak-type fusion reactor has been carried out. The purposes are to reveal and study problems in the system, leading to a plan of the research and development. Performed were study of the electrical power supply system and design of superconducting inductive energy storages and power switches. In study of the system, specification and capability of various power supplies for the fusion power reactor and design of the total system with its components were investigated. For the superconducting inductive energy storages, material choice, design calculation, and structural design were conducted, giving the size, weight and performance. For thyristor switches, circuit design in the parallel / series connection of element valves and cooling design were studied, providing the size and weight. (auth.)

  7. Evaluation of all-electric secondary power for transport aircraft

    Science.gov (United States)

    Murray, W. E.; Feiner, L. J.; Flores, R. R.

    1992-01-01

    This report covers a study by Douglas Aircraft Company (DAC) of electrical power systems for advanced transport aircraft based upon an all-electric design concept. The concept would eliminate distributed hydraulic and pneumatic secondary power systems, and feature an expanded secondary electrical power system redesigned to supply power to the loads customarily supplied by hydraulic or pneumatic power. The initial study was based on an advanced 20-kHz electrical power transmission and distribution system, using a system architecture supplied by NASA-Lewis Research Center for twin-engine aircraft with many advanced power conversion concepts. NASA-LeRC later requested DAC to refocus the study on 400-Hz secondary power distribution. Subsequent work was based on a three-engine MD-11 aircraft, selected by DAC as a baseline system design that would provide data for the comparative cost/benefit analysis. The study concluded that the 20-kHz concept produced many expected benefits, and that the all-electric trijet weight savings on hardware redesign would be 2,304 pounds plus a 2.1-percent fuel reduction and resized for a total weight reduction of 11,000 pounds. Cost reductions for a fleet of 800 aircraft in a 15-year production program were estimated at $76.71 million for RDT&E; $2.74 million per aircrat for production; $9.84 million for nonrecurring expenses; $120,000 per aircraft for product support; and $300,000 per aircraft per year for operating and maintenance costs, giving a present value of $1.914 billion saved or a future value of $10.496 billion saved.

  8. Ten-year statistics of the electric power supply. Status and tendencies

    International Nuclear Information System (INIS)

    2000-12-01

    The ten-year statistics of the electric power supply in Denmark for 1990-1999 presents in tables and figures the trend of the electric power supply sector during the last ten years. The tables and figures present information on total energy consumption, combined heat and power generation, fuel consumption and the environment, the technical systems, economy and pricing, organization of the electricity supply, auto-production of electricity and information on electricity prices and taxes for households and industry in various countries. (LN)

  9. Electrical power systems for Space Station

    Science.gov (United States)

    Simon, W. E.

    1984-01-01

    Major challenges in power system development are described. Evolutionary growth, operational lifetime, and other design requirements are discussed. A pictorial view of weight-optimized power system applications shows which systems are best for missions of various lengths and required power level. Following definition of the major elements of the electrical power system, an overview of element options and a brief technology assessment are presented. Selected trade-study results show end-to-end system efficiencies, required photovoltaic power capability as a function of energy storage system efficiency, and comparisons with other systems such as a solar dynamic power system.

  10. Impacts of Demand-Side Management on Electrical Power Systems: A Review

    Directory of Open Access Journals (Sweden)

    Hussein Jumma Jabir

    2018-04-01

    Full Text Available Electricity demand has grown over the past few years and will continue to grow in the future. The increase in electricity demand is mainly due to industrialization and the shift from a conventional to a smart-grid paradigm. The number of microgrids, renewable energy sources, plug-in electric vehicles and energy storage systems have also risen in recent years. As a result, future electricity grids have to be revamped and adapt to increasing load levels. Thus, new complications associated with future electrical power systems and technologies must be considered. Demand-side management (DSM programs offer promising solutions to these issues and can considerably improve the reliability and financial performances of electrical power systems. This paper presents a review of various initiatives, techniques, impacts and recent developments of the DSM of electrical power systems. The potential benefits derived by implementing DSM in electrical power networks are presented. An extensive literature survey on the impacts of DSM on the reliability of electrical power systems is also provided for the first time. The research gaps within the broad field of DSM are also identified to provide directions for future work.

  11. An electric-eel-inspired soft power source from stacked hydrogels

    Science.gov (United States)

    Schroeder, Thomas B. H.; Guha, Anirvan; Lamoureux, Aaron; Vanrenterghem, Gloria; Sept, David; Shtein, Max; Yang, Jerry; Mayer, Michael

    2017-12-01

    Progress towards the integration of technology into living organisms requires electrical power sources that are biocompatible, mechanically flexible, and able to harness the chemical energy available inside biological systems. Conventional batteries were not designed with these criteria in mind. The electric organ of the knifefish Electrophorus electricus (commonly known as the electric eel) is, however, an example of an electrical power source that operates within biological constraints while featuring power characteristics that include peak potential differences of 600 volts and currents of 1 ampere. Here we introduce an electric-eel-inspired power concept that uses gradients of ions between miniature polyacrylamide hydrogel compartments bounded by a repeating sequence of cation- and anion-selective hydrogel membranes. The system uses a scalable stacking or folding geometry that generates 110 volts at open circuit or 27 milliwatts per square metre per gel cell upon simultaneous, self-registered mechanical contact activation of thousands of gel compartments in series while circumventing power dissipation before contact. Unlike typical batteries, these systems are soft, flexible, transparent, and potentially biocompatible. These characteristics suggest that artificial electric organs could be used to power next-generation implant materials such as pacemakers, implantable sensors, or prosthetic devices in hybrids of living and non-living systems.

  12. An electric-eel-inspired soft power source from stacked hydrogels.

    Science.gov (United States)

    Schroeder, Thomas B H; Guha, Anirvan; Lamoureux, Aaron; VanRenterghem, Gloria; Sept, David; Shtein, Max; Yang, Jerry; Mayer, Michael

    2017-12-13

    Progress towards the integration of technology into living organisms requires electrical power sources that are biocompatible, mechanically flexible, and able to harness the chemical energy available inside biological systems. Conventional batteries were not designed with these criteria in mind. The electric organ of the knifefish Electrophorus electricus (commonly known as the electric eel) is, however, an example of an electrical power source that operates within biological constraints while featuring power characteristics that include peak potential differences of 600 volts and currents of 1 ampere. Here we introduce an electric-eel-inspired power concept that uses gradients of ions between miniature polyacrylamide hydrogel compartments bounded by a repeating sequence of cation- and anion-selective hydrogel membranes. The system uses a scalable stacking or folding geometry that generates 110 volts at open circuit or 27 milliwatts per square metre per gel cell upon simultaneous, self-registered mechanical contact activation of thousands of gel compartments in series while circumventing power dissipation before contact. Unlike typical batteries, these systems are soft, flexible, transparent, and potentially biocompatible. These characteristics suggest that artificial electric organs could be used to power next-generation implant materials such as pacemakers, implantable sensors, or prosthetic devices in hybrids of living and non-living systems.

  13. Electric power monthly, February 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    The Electric Power Monthly (EMP) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  14. Electric power monthly, January 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels

  15. Electric power monthly, January 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-26

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  16. Electric power monthly, October 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-20

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  17. Electric power economy in industry and commerce II

    International Nuclear Information System (INIS)

    Mamede Filho, J.

    1988-01-01

    The acts of electric power economy in Brazil are studied, including the improvement of load factor, maintain a high power-factor and use of monthly consumption method and medium powers method. (author)

  18. Maximizing electrical power supply using FACTS devices

    OpenAIRE

    Lehmann, Karsten; Bent, Russell; Pan, Feng

    2015-01-01

    Modern society critically depends on the services electric power provides. Power systems rely on a network of power lines and transformers to deliver power from sources of power (generators) to the consumers (loads). However, when power lines fail (for example, through lightning or natural disasters) or when the system is heavily used, the network is often unable to fulfill all of the demand for power. While systems are vulnerable to these failures, increasingly, sophisticated control devices...

  19. Buying Renewable Electric Power in Montgomery County, Maryland

    Science.gov (United States)

    Cember, Richard P.

    2008-08-01

    From mid-August 2007 until mid-August 2008, my home electricity supply was 100% wind-generated. My experience in switching to wind-generated electric power may be of interest to fellow AGU members for three reasons. First, Montgomery County, Md., where I live, is one of the few jurisdictions in the United States that has both an electric power tax and a renewable energy credit. The county is therefore a case study in price-based public policy for greenhouse gas emissions control. Second, I was surprised by the comparatively small price difference (or ``price premium'') between wind-generated and conventionally generated power in the county, and I believe that Eos readers will be similarly surprised. Third, because so many U.S. federal agencies concerned with Earth science are based in the Washington, D. C., area, a high concentration of AGU members live in Montgomery County and may be personally interested in evaluating the price of reducing carbon dioxide emissions from the generation of their own residential electricity.

  20. Electric power bidding model for practical utility system

    Directory of Open Access Journals (Sweden)

    M. Prabavathi

    2018-03-01

    Full Text Available A competitive open market environment has been created due to the restructuring in the electricity market. In the new competitive market, mostly a centrally operated pool with a power exchange has been introduced to meet the offers from the competing suppliers with the bids of the customers. In such an open access environment, the formation of bidding strategy is one of the most challenging and important tasks for electricity participants to maximize their profit. To build bidding strategies for power suppliers and consumers in the restructured electricity market, a new mathematical framework is proposed in this paper. It is assumed that each participant submits several blocks of real power quantities along with their bidding prices. The effectiveness of the proposed method is tested on Indian Utility-62 bus system and IEEE-118 bus system. Keywords: Bidding strategy, Day ahead electricity market, Market clearing price, Market clearing volume, Block bid, Intermediate value theorem

  1. Development of management systems for nuclear power plant of Hokuriku Electric Power Company

    International Nuclear Information System (INIS)

    Nakamura, Tatsuaki; Hasunuma, Junichi; Suzuki, Shintaro

    2009-01-01

    Hokuriku Electric Power Company has been operating the Shika Nuclear Power Station that it constructed in Shika city, Ishikawa prefecture, for over 15 years since bringing Unit 1 of this plant online in July 1993. In addition to electricity generation, maintenance and inspection tasks constitute a big part of operating a large-scale nuclear power plant, and in recent years, problems at power stations in the nuclear power industry have led to several revisions of nationally regulated maintenance and inspection systems. This paper describes the background, objectives, development method, and features of the Maintenance Management System and Maintenance History Management System that make effective use of information technology to promote safer and more efficient maintenance work at large-scale nuclear power plants. (author)

  2. 78 FR 29159 - Electric Power Research Institute; Seismic Evaluation Guidance

    Science.gov (United States)

    2013-05-17

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0038] Electric Power Research Institute; Seismic... U.S. Nuclear Regulatory Commission (NRC) is issuing an endorsement letter of Electric Power Research... Fukushima Dai-ichi nuclear power plant in March 2011. Enclosure 1 to the 50.54(f) letter requests licensees...

  3. Electric power markets in Europe 1993; Elmarknaderna i Europa 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hermanson, K; Lublin, Z; Olofsdotter, A; Petsala, B; Wuolikainen, T

    1993-12-01

    The development of power markets in Europe is described. Special attention is devoted to the development in France, Germany, Denmark, Finland and Norway. The planned deregulation of the Swedish electric power market will promote an increased trade with electricity across the border. The possibilities and consequences of this trade is elucidated. Also given is a compilation of electric power prices for different groups of consumers, and the differences among European countries. 7 figs, 26 tabs

  4. Electrical power system WP-04

    Science.gov (United States)

    Nored, Donald L.

    1990-01-01

    Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.

  5. Electrical and magnetic fields of the power supply

    International Nuclear Information System (INIS)

    2017-01-01

    The availability of electrical energy in all areas of life is guaranteed by a widely ramified power grid. When electricity is transported, magnetic fields are created in addition to the electrical fields. In this brochure one will learn more about the causes and effects of electrical and magnetic fields as well as protection concepts and preventive measures. [de

  6. Instantaneous input electrical power measurements of HITU transducer

    International Nuclear Information System (INIS)

    Karaboece, B; Guelmez, Y; Rajagapol, S; Shaw, A

    2011-01-01

    HITU (High Intensity Theraupetic Ultrasound) transducers are widely used in therapeutic ultrasound in medicine. The output ultrasonic power of HITU transducer can be measured in number of methods described in IEC 61161 standard [1]. New IEC standards specifically for measurement of HITU equipment are under development. The ultrasound power radiated from a transducer is dependent on applied input electrical voltage and current and consequently power. But, up to now, no standardised method has been developed and adopted for the input electrical power measurements. Hence, a workpackage was carried out for the establishment of such method in the frequency range of 1 to 3 MHz as a part of EURAMET EMRP Era-net plus 'External Beam Cancer Therapy' project. Several current shunts were developed and evaluated. Current measurements were also realized with Philips current probe and preamplifier at NPL and Agilent current probe at UME. In this paper, a method for the measurement of instantaneous electrical power delivered to a reactive ultrasound transducer in the required frequency range is explored.

  7. Instantaneous input electrical power measurements of HITU transducer

    Energy Technology Data Exchange (ETDEWEB)

    Karaboece, B; Guelmez, Y [Tuebitak Ulusal Metroloji Enstituesue (UME), P.K. 54 41470 Gebze-Kocaeli (Turkey); Rajagapol, S; Shaw, A, E-mail: baki.karaboce@ume.tubitak.gov.t [National Physical Laboratory (NPL), Hampton Road, Teddington TW11 0LW (United Kingdom)

    2011-02-01

    HITU (High Intensity Theraupetic Ultrasound) transducers are widely used in therapeutic ultrasound in medicine. The output ultrasonic power of HITU transducer can be measured in number of methods described in IEC 61161 standard [1]. New IEC standards specifically for measurement of HITU equipment are under development. The ultrasound power radiated from a transducer is dependent on applied input electrical voltage and current and consequently power. But, up to now, no standardised method has been developed and adopted for the input electrical power measurements. Hence, a workpackage was carried out for the establishment of such method in the frequency range of 1 to 3 MHz as a part of EURAMET EMRP Era-net plus 'External Beam Cancer Therapy' project. Several current shunts were developed and evaluated. Current measurements were also realized with Philips current probe and preamplifier at NPL and Agilent current probe at UME. In this paper, a method for the measurement of instantaneous electrical power delivered to a reactive ultrasound transducer in the required frequency range is explored.

  8. Stochastic Optimal Wind Power Bidding Strategy in Short-Term Electricity Market

    DEFF Research Database (Denmark)

    Hu, Weihao; Chen, Zhe; Bak-Jensen, Birgitte

    2012-01-01

    Due to the fluctuating nature and non-perfect forecast of the wind power, the wind power owners are penalized for the imbalance costs of the regulation, when they trade wind power in the short-term liberalized electricity market. Therefore, in this paper a formulation of an imbalance cost...... minimization problem for trading wind power in the short-term electricity market is described, to help the wind power owners optimize their bidding strategy. Stochastic optimization and a Monte Carlo method are adopted to find the optimal bidding strategy for trading wind power in the short-term electricity...... market in order to deal with the uncertainty of the regulation price, the activated regulation of the power system and the forecasted wind power generation. The Danish short-term electricity market and a wind farm in western Denmark are chosen as study cases due to the high wind power penetration here...

  9. Impacts of Electric Vehicle Loads on Power Distribution Systems

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2010-01-01

    operation. This paper investigates the effects on the key power distribution system parameters like voltages, line drops, system losses etc. by integrating electric vehicles in the range of 0-50% of the cars with different charging capacities. The dump as well as smart charging modes of electric vehicles......Electric vehicles (EVs) are the most promising alternative to replace a significant amount of gasoline vehicles to provide cleaner, CO2 free and climate friendly transportation. On integrating more electric vehicles, the electric utilities must analyse the related impacts on the electricity system...... is applied in this analysis. A typical Danish primary power distribution system is used as a test case for the studies. From the simulation results, not more than 10% of electric vehicles could be integrated in the test system for the dump charging mode. About 40% of electric vehicle loads could...

  10. Spacecraft Electrical Power System (EPS) generic analysis tools and techniques

    Science.gov (United States)

    Morris, Gladys M.; Sheppard, Mark A.

    1992-01-01

    An overview is provided of the analysis tools and techiques used in modeling the Space Station Freedom electrical power system, as well as future space vehicle power systems. The analysis capabilities of the Electrical Power System (EPS) are described and the EPS analysis tools are surveyed.

  11. Comparison of all-electric secondary power systems for civil subsonic transports

    Science.gov (United States)

    Renz, David D.

    1992-01-01

    Three separate studies have shown operational, weight, and cost advantages for commercial subsonic transport aircraft using an all-electric secondary power system. The first study in 1982 showed that all-electric secondary power systems produced the second largest benefit compared to four other technology upgrades. The second study in 1985 showed a 10 percent weight and fuel savings using an all-electric high frequency (20 kHz) secondary power system. The last study in 1991 showed a 2 percent weight savings using today's technology (400 Hz) in an all-electric secondary power system. This paper will compare the 20 kHz and 400 Hz studies, analyze the 2 to 10 percent difference in weight savings and comment on the common benefits of the all-electric secondary power system.

  12. Electric power economy: comparative study of electric power consumption in many methods of outfloor control

    International Nuclear Information System (INIS)

    Kubota, Hideo; Tsitiya, Milton Tomoyuki

    1989-01-01

    This work presents a comparative study of the electric power consumption of a water elevatory station in order to verify which method is the most suitable in energy economy through the outflow variation in function of the demand

  13. THE EVALUATION OF THE EFFECT OF REACTIVE POWER COMPENSATION IN ELECTRIC POWER LOSSES IN ELECTRIC NETWORK OF RAILWAY JUNCTION

    OpenAIRE

    O. I. Bondar; I. L. Bondar

    2009-01-01

    In this work the generalized mathematical model of an electrical network of the electrified railway junction is proposed. An estimation of influence of static var compensators installation on electric power losses in a network is executed on the basis of given model.

  14. An radiotoxicity evaluation of high level wastes for a scenery of Brazilian Nuclear Power Plants in accordance with the Energy Expansion Brazilian Plan 2030

    International Nuclear Information System (INIS)

    Guilhem, Andres C.; Maiorino, Jose R.

    2011-01-01

    This paper is a part of the author scientific initiation, and makes an evaluation of the radiotoxicity which would be produced by the Brazilian nuclear power plants in a scenery of 7 power plants operating in 2030, in according to the official expansion plans which point out the additional introduction of 4000 MW(e), or 4 ne power plant additionally to the Angra I, II and III. Considering that all reactors would be a PWR reactors. The calculated parameter was the relative toxicity of the low and intermediate level nuclear wastes (LLPP - long lived fission products and HLW - high level waste related to the radiotoxicity of natural uranium versus time. All the calculation used the ORIGEN-S code. (author)

  15. Electric power and gas markets

    International Nuclear Information System (INIS)

    2001-01-01

    These two days organized by EFE in Paris, dealt with the european market of the gas and the electrical power. The first day developed the actual situation and the tendencies. The french market deregulation, the possibility of a united market and the energy transportation sector are discussed. The second day dealt with the new commercial technologies, the convergence of Gas and Electricity and the competing in a change world, the opportunities of the NTIC (new technologies of the information and communication). (A.L.B.)

  16. Electricity storage. A solution for wind power integration? Study on the economic and institutional aspects of the implementation of electricity storage for the integration of wind power

    International Nuclear Information System (INIS)

    Hendriks, R.H.

    2004-06-01

    In today's society a power outage can lead to major financial damage. It is therefore of high importance that the electricity system is reliable and that customers can rely on high security of supply. To prevent power outages, the electricity system has to be in balance continuously: supply and load have to be equal. Currently the majority of the electricity generation is done by conventional power plants of which the operation schedule is fully controllable. This means that these plants can be operated in such a way that electricity demand, which varies during the day, can be met continuously. The integration of a large share of wind power in the electricity supply system however, can lead to problems with respect to the balancing of the electricity system. This is caused by the fact that wind power has an intermittent character. Its production fluctuates and is uncertain: it therefore cannot be used to follow the varying load. Electricity storage could contribute to the integration of wind power in the electricity supply system. Storage systems can decouple the timing of generation and consumption of electricity and can therefore compensate for the fluctuations in wind power production. This investigation aims at identifying what problems the integration of a large share of wind power will cause and how electricity storage can resolve these problems. Subsequently, the implementation costs of storage systems for the identified applications will be investigated. Finally, the current regulatory environment will be discussed to evaluate whether it is geared to the implementation of electricity storage. Therefore, the following research question is formulated: Under which technological and institutional preconditions will it be advantageous to implement electricity storage systems, in combination with wind farms, in the next 20 years? To answer the research question the following subquestions have been formulated: (1) What are the implications of the market design on

  17. Electric power distribution. 5th Rev. Ed. Elektrische Energieverteilung

    Energy Technology Data Exchange (ETDEWEB)

    Flosdorff, R; Hilgarth, G

    1986-01-01

    The first chapter on electric power supply networks discusses transmitting media, their characteristic values, and the dimensioning of electric lines and networks; cables are given particular attention. High-voltage d.c. transmission and reactive power compensation are discussed. The next chapter describes the calculation of short-circuits and earth leakages for various neutral circuits on the basis of symmetric components. The newly introduced mesh current method for complex calculation of electric networks makes use of the potential of pocket computers. Chapter 3 discusses protective devices, i.e. earth systems and electronic protection. The next two chapters describe switch gear and power plants, including recent technical changes. The final chapter, which discusses the electric power industry, has been rewritten and extended. Methods of calculation, e.g. annual cost and cash value, are applied to transmitting media and plants. There is an extensive appendix with characteristic values of cables and overhead lines, graphical symbols, distinguishing signs of wiring diagrams, a bibliography of books, DIN standards, VDE specifications, and formulas.

  18. 77 FR 11515 - Application To Export Electric Energy; Pilot Power Group, Inc.

    Science.gov (United States)

    2012-02-27

    ... reliability of the U.S. electric power supply system. Copies of this application will be made available, upon... DEPARTMENT OF ENERGY [OE Docket No. EA-383] Application To Export Electric Energy; Pilot Power... application. SUMMARY: Pilot Power Group, Inc. (Pilot Power) has applied for authority to transmit electric...

  19. EHV AC undergrounding electrical power performance and planning

    CERN Document Server

    Benato, Roberto

    2014-01-01

    Analytical methods of cable performance in EHV AC electrical power are discussed in this comprehensive reference. Descriptions of energization, power quality, cable safety constraints and more, guide readers in cable planning and power network operations.

  20. HIL Simulation of Power Electronics and Electric Drives for Automotive Applications

    Directory of Open Access Journals (Sweden)

    Frank Puschmann

    2012-12-01

    Full Text Available Hardware-in-the-loop simulation is today a standard method for testing electronic equipment in the automotive industry. Since electric drives and power electronic devices are more and more important in automotive applications, these kinds of systems have to be integrated into the hardware-in-the-loop simulation. Power converters and electric drives are used in many different applications in vehicles today (hybrid electric or electric powertrain, electric steering systems, DC-DC converters, etc.. The wide range of applications, topologies, and power levels results in various different approaches and solutions for hardware-in-the-loop testing. This paper gives an overview of hardware-in-the-loop simulation of power electronics and electric drives in the automotive industry. The currently available technologies are described and future challenges are outlined.