WorldWideScience

Sample records for bonneville power administration

  1. Bonneville Power Administration 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  2. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  3. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    International Nuclear Information System (INIS)

    Englin, J.E.; Gygi, K.F.

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs

  4. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  5. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Conger, R.L.

    1996-06-01

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  6. 78 FR 39279 - United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

    Science.gov (United States)

    2013-07-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ13-10-000] United States Department of Energy; Bonneville Power Administration; Notice of Petition for Declaratory Order Take notice... (OATT) and a Petition for Declaratory Order requesting the Commission find that Bonneville's OATT, as...

  7. Bonneville Power Administration 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  8. Bonneville Power Administration`s Commercial Sector Conservation Market.

    Energy Technology Data Exchange (ETDEWEB)

    Gordan, Frederick M. [Pacific Energy Associates, Inc. (United States)

    1992-11-10

    Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

  9. Hydropower operations data management at Bonneville Power Administration

    International Nuclear Information System (INIS)

    Dies, R.

    2006-01-01

    The decision support software used by Bonneville Power Administration (BPA) in its operation of the Federal Columbia River Power System in the Pacific northwest was presented along with examples of water resources data and information regarding weather and stream flow. Water resources data is used extensively in hydropower operations for planning purposes through to real-time operations. This includes long-term historical hydrology and realtime system information on snow cover, river discharges and water elevations. Since the data comes from many different sources, the quality and frequency varies, with sample intervals ranging from seconds to days. Some data may be intermittent and transmitted only when thresholds are reached. Data can be communication via SCADA telemetry, the Internet, direct satellite feed, telephone or fax. The key requirement for a decision support system is the reliable and easily accessed compilation of all this data. The BPA uses long-term planning models, system-wide generation scheduling applications, and near-real-time optimization of generating units. It was suggested that the hydrologic forecasting community could benefit from the utility's experience using these applications. tabs., figs

  10. Bonneville Power Administration: financial fallout from termination of WPPSS nuclear projects 4 and 5. Oversight hearings before the Subcommittee on Mining, Forest Management, and Bonneville Power Administration of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-Eighth Congress, First Session, February 14 and 15, 1983

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Peter T. Johnson, Administrator of the Bonneville Power Administration, and a representative of the Washington Public Power Supply System (WPPSS) described the financial situation resulting from the cancellations and cost overruns of WPPSS nuclear projects that have left the area with an unacceptable debt. Four panels representing area utilities and electric cooperatives described their financial positions on the second day of hearings. Two appendices with additional material from Bonneville, WPPSS, the Department of the Interior, and others follow the testimony

  11. 77 FR 15096 - Bonneville Power Administration; Notice of Compliance Filing

    Science.gov (United States)

    2012-03-14

    ... Commission's Order.\\1\\ \\1\\ Iberdrola Renewables, Inc. v. Bonneville Power Admin., 137 FERC ] 61,185 (2011... the Web site that enables subscribers to receive email notification when a document is added to a...

  12. Conductor qualification tests for the 30-MJ Bonneville Power Administration SMES coil

    International Nuclear Information System (INIS)

    Schermer, R.I.; Boenig, H.J.; Henke, M.; Turner, R.D.; Schramm, R.

    1980-01-01

    The 30-MJ energy storage coil for the Bonneville Power Administration requires a low-loss, cryostable conductor that is able to carry 4.9 kA in a field of 2.8 T and will maintain its properties over 10 8 partial discharge cycles. The multi-level cable which satisfies these requirements has been extensively tested at various stages in its development and in its final form. Tests have been performed to determine the effect of manufacturing options on ac losses, low temperature electrical resistivity, stability, and fatigue resistance of the insulated conductor. This paper will concentrate on the stability and fatigue tests which have not previously been reported

  13. Design and operation of the 30-MJ superconducting magnetic-storage system on the Bonneville Power Administration bus

    International Nuclear Information System (INIS)

    Schermer, R.I.; Barron, M.H.; Boenig, H.J.

    1983-01-01

    A superconducting magnetic-energy-storage (SMES) unit is suitable for power-system stabilization because it can provide positive damping by absorbing or releasing energy with a relatively fast response time, 10 ms. In the fall of 1982, an SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration as an experiment in monitoring, predicting and improving system stability. This paper reports principally on the system testing

  14. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  15. Wide-Area Energy Storage and Management System to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

    DEFF Research Database (Denmark)

    Makarov, Yuri V.; Yang, Bo; DeSteese, John G.

    2009-01-01

    This paper addresses the issue of mitigating additional intermittency and fast ramps that are expected to occur at high penetration levels of intermittent resources, including wind generation resources, in the Bonneville Power Administration (BPA) and the California Independent System Operator...

  16. Bonneville Power Administration (BPA) and Washington Public Power Supply System (WPPSS). Part III. Oversight hearing before the Subcommittee on Mining, Forest Management, and Bonneville Power Administration of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-Eight Congress, Second Session, March 28 and August 2, 1984

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Part III of the hearing record contains the testimony of Peter Johnson, Bonneville Power Administration (BPA) Administrator, and Energy Secretary Donald Hodel on the subject of BPA's contracts with the Washington Public Power Supply System (WPPSS) in which BPA will assume responsibility of WPPSS nuclear projects 1, 2, and 3. At issue was whether the contracts exceed BPA's authority and the protection of BPA's $1.9 billion invested in the projects. Johnson denied any secret agreements and emphasized that the intent was to preserve the assets for the federal government and federal power system. On the second hearing day, Hodel explained DOE's involvement in the agreements and its concurrence with BPA because of related litigation. An appendix with additional correspondence and statements submitted for the record follows the testimony

  17. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program

    International Nuclear Information System (INIS)

    Glantz, C.S.; Burk, K.W.; Driver, C.J.; Liljegren, J.C.; Neitzel, D.A.; Schwartz, M.N.; Dana, M.T.; Laws, G.L.; Mahoney, L.A.; Rhoads, K.

    1992-04-01

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives

  18. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C S; Burk, K W; Driver, C J; Liljegren, J C; Neitzel, D A; Schwartz, M N; Dana, M T; Laws, G L; Mahoney, L A; Rhoads, K

    1992-04-01

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives.

  19. Bonneville Power Administration 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  20. 1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report

    Energy Technology Data Exchange (ETDEWEB)

    Warwick, W.M.

    1995-01-01

    The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

  1. Ground source heat pump retrofit at North Bonneville, WA City Hall

    Energy Technology Data Exchange (ETDEWEB)

    Hughey, M. [Skamania Co. PUD No. 1, Carson, WA (United States)

    1997-12-31

    In 1995, the City of North Bonneville, WA installed a 10-ton Ground Source Heat Pump (GSHP) to replace the electric resistance furnace in its 4,000 square, foot City Hall. North Bonneville is 30 miles east of Portland, Oregon, at river level in the Columbia River Gorge. Funded jointly by the Bonneville Power Administration, the State of Washington and the City, this project has successfully reduced the heating cost of City Hall by nearly one-half while dramatically increasing comfort. It has become a commercial model in the Pacific Northwest for assessing values of commercial GSHP retrofits. This interim report compares estimated savings with actual experience for the first operating year. Projected savings were $1,500; actual savings were $1,390 prior to adjustment for extreme weather. Adjusted savings for Heating Year 1996 were $1,490, a 47 percent decrease. Maintenance savings (not itemized) were in addition to this amount. Monitoring continues in 1997.

  2. Power Subscription Strategy: Administrator`s Record of Decision.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1998-12-01

    The Bonneville Power Administration (BPA) has decided to adopt a Power Subscription Strategy for entering into new power sales contracts with its Pacific Northwest customers. The Strategy equitably distributes the electric power generated by the Federal Columbia River Power System (FCRPS) within the framework of existing law. The Power Subscription Strategy addresses the availability of power; describes power products; lays out strategies for pricing, including risk management; and discusses contract elements. In proceeding with this Subscription Strategy, BPA is guided by and committed to the Fish and Wildlife funding Principles for the BPA announced by the Vice President of the US in September 1998. This Record of Decision (ROD) addresses the issues raised by commenters who responded to BPA`s Power Subscription Strategy Proposal during and after the comment period that began with the release of the Proposal on September 18, 1998. The ROD is organized in approximately the same way as the Proposal and the Power Subscription Strategy that BPA developed based on the comments received. Abbreviations of party names used in citations appear in the section just preceding this introduction; a list of all the commenters follows the text of the ROD.

  3. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  4. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

  5. 18 CFR 301.3 - Filing procedures.

    Science.gov (United States)

    2010-04-01

    ... FOR SALES FROM UTILITIES TO BONNEVILLE POWER ADMINISTRATION UNDER NORTHWEST POWER ACT § 301.3 Filing procedures. (a) Bonneville's ASC review procedures. The procedures established by Bonneville's Administrator... Bonneville's ASC review procedures. (b) Exchange Period. The Exchange Period will be equal to the term of...

  6. Socioeconomic effects of power marketing alternatives for the Central Valley and Washoe Projects: 2005 regional econmic impact analysis using IMPLAN

    International Nuclear Information System (INIS)

    Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

    1996-11-01

    The Western Area Power Administration (Western) was founded by the Department of Energy Organization Act of 1977 to market and transmit federal hydroelectric power in 15 western states outside the Pacific Northwest, which is served by the Bonneville Power Administration. Western is divided into four independent Customer Service Regions including the Sierra Nevada Region (Sierra Nevada), the focus of this report. The Central Valley Project (CVP) and the Washoe Project provide the primary power resources marketed by Sierra Nevada. Sierra Nevada also purchases and markets power generated by the Bonneville Power Administration, Pacific Gas and Electric (PG ampersand E), and various power pools. Sierra Nevada currently markets approximately 1,480 megawatts of power to 77 customers in northern and central California. These customers include investor-owned utilities, public utilities, government agencies, military bases, and irrigation districts. Methods and conclusions from an economic analysis are summarized concerning distributional effects of alternative actions that Sierra Nevada could take with it's new marketing plan

  7. 18 CFR 301.2 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... SALES FROM UTILITIES TO BONNEVILLE POWER ADMINISTRATION UNDER NORTHWEST POWER ACT § 301.2 Definitions... Period ASC. Average System Cost review process (ASC review process). The administrative proceeding conducted before Bonneville under Bonneville's ASC review procedures in which a Utility's ASC is determined...

  8. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

  9. Power Subscription Strategy

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    1998-12-21

    This document lays out the Bonneville Power Administration`s Power Subscription Strategy, a process that will enable the people of the Pacific Northwest to share the benefits of the Federal Columbia river Power System after 2001 while retaining those benefits within the region for future generations. The strategy also addresses how those who receive the benefits of the region`s low-cost federal power should share a corresponding measure of the risks. This strategy seeks to implement the subscription concept created by the Comprehensive Review in 1996 through contracts for the sale of power and the distribution of federal power benefits in the deregulated wholesale electricity market. The success of the subscription process is fundamental to BPA`s overall business purpose to provide public benefits to the Northwest through commercially successful businesses.

  10. Legacy Panorama on Spirit's Way to 'Bonneville'

    Science.gov (United States)

    2005-01-01

    [figure removed for brevity, see original site] Click on the image for Legacy Panorama on Spirit's Way to 'Bonneville' (QTVR) This view captured by the panoramic camera on NASA's Mars Exploration Rover Spirit nearly a year ago is called Spirit's 'Legacy' panorama. It combines many frames acquired during Spirit's 59th through 61st martian days, or sols (March 3 to 5, 2004) from a position about halfway between the landing site and the rim of 'Bonneville Crater.' The location is within the transition from the relatively smooth plains to the more rocky and rugged blanket of material ejected from Bonneville by the force of the impact that dug the crater. The panorama spans 360 degrees and consists of images obtained in 78 individual pointings. The camera took images though 5 different filter at each pointing. This mosaic is an approximately true-color rendering generated using the images acquired through filters centered at wavelengths of 750, 530, and 480 nanometers. The Columbia Memorial Station lander can be seen about 200 meters (about 650 feet) in the distance by following the rover tracks back toward right of center in the mosaic and zooming in.

  11. 75 FR 15430 - Chief Joseph Hatchery Program

    Science.gov (United States)

    2010-03-29

    ... production program and hatchery facilities. The National Oceanic and Atmospheric Administration's National... DEPARTMENT OF ENERGY Bonneville Power Administration Chief Joseph Hatchery Program AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record...

  12. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

  13. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  14. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  15. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  16. 75 FR 27550 - Electrical Interconnection of the Juniper Canyon I Wind Project

    Science.gov (United States)

    2010-05-17

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Juniper Canyon I Wind Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... would be generated from their proposed Juniper Canyon I Wind Energy Project (Wind Project) in Klickitat...

  17. 75 FR 6020 - Electrical Interconnection of the Lower Snake River Wind Energy Project

    Science.gov (United States)

    2010-02-05

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Electrical Interconnection of the Lower Snake River Wind Energy Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... (BPA) has decided to offer Puget Sound Energy Inc., a Large Generator Interconnection Agreement for...

  18. 1998-1999 evaluation of fall chinook and chum salmon spawning below Bonneville, The Dalles, John Day and McNary dams

    International Nuclear Information System (INIS)

    Naald, W.D. van der

    2001-01-01

    This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6

  19. Keeping current, June 1998. Issues 98: Securing the value of the federal Columbia River power system

    International Nuclear Information System (INIS)

    1998-06-01

    This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management

  20. Securing the Value of the Federal Columbia River Power System, Keeping Current, June 1998, Issue 98.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-06-01

    This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management.

  1. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  2. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  3. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

    2005-01-01

    In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence

  4. Computational fluid dynamics simulations of the Late Pleistocene Lake Bonneville flood

    Science.gov (United States)

    Abril-Hernández, José M.; Periáñez, Raúl; O'Connor, Jim E.; Garcia-Castellanos, Daniel

    2018-01-01

    At approximately 18.0 ka, pluvial Lake Bonneville reached its maximum level. At its northeastern extent it was impounded by alluvium of the Marsh Creek Fan, which breached at some point north of Red Rock Pass (Idaho), leading to one of the largest floods on Earth. About 5320 km3 of water was discharged into the Snake River drainage and ultimately into the Columbia River. We use a 0D model and a 2D non-linear depth-averaged hydrodynamic model to aid understanding of outflow dynamics, specifically evaluating controls on the amount of water exiting the Lake Bonneville basin exerted by the Red Rock Pass outlet lithology and geometry as well as those imposed by the internal lake geometry of the Bonneville basin. These models are based on field evidence of prominent lake levels, hypsometry and terrain elevations corrected for post-flood isostatic deformation of the lake basin, as well as reconstructions of the topography at the outlet for both the initial and final stages of the flood. Internal flow dynamics in the northern Lake Bonneville basin during the flood were affected by the narrow passages separating the Cache Valley from the main body of Lake Bonneville. This constriction imposed a water-level drop of up to 2.7 m at the time of peak-flow conditions and likely reduced the peak discharge at the lake outlet by about 6%. The modeled peak outlet flow is 0.85·106 m3 s−1. Energy balance calculations give an estimate for the erodibility coefficient for the alluvial Marsh Creek divide of ∼0.005 m y−1 Pa−1.5, at least two orders of magnitude greater than for the underlying bedrock at the outlet. Computing quasi steady-state water flows, water elevations, water currents and shear stresses as a function of the water-level drop in the lake and for the sequential stages of erosion in the outlet gives estimates of the incision rates and an estimate of the outflow hydrograph during the Bonneville Flood: About 18 days would have been required for the

  5. Computational Fluid Dynamics simulations of the Late Pleistocene Lake Bonneville Flood

    Science.gov (United States)

    Abril-Hernández, José M.; Periáñez, Raúl; O'Connor, Jim E.; Garcia-Castellanos, Daniel

    2018-06-01

    At approximately 18.0 ka, pluvial Lake Bonneville reached its maximum level. At its northeastern extent it was impounded by alluvium of the Marsh Creek Fan, which breached at some point north of Red Rock Pass (Idaho), leading to one of the largest floods on Earth. About 5320 km3 of water was discharged into the Snake River drainage and ultimately into the Columbia River. We use a 0D model and a 2D non-linear depth-averaged hydrodynamic model to aid understanding of outflow dynamics, specifically evaluating controls on the amount of water exiting the Lake Bonneville basin exerted by the Red Rock Pass outlet lithology and geometry as well as those imposed by the internal lake geometry of the Bonneville basin. These models are based on field evidence of prominent lake levels, hypsometry and terrain elevations corrected for post-flood isostatic deformation of the lake basin, as well as reconstructions of the topography at the outlet for both the initial and final stages of the flood. Internal flow dynamics in the northern Lake Bonneville basin during the flood were affected by the narrow passages separating the Cache Valley from the main body of Lake Bonneville. This constriction imposed a water-level drop of up to 2.7 m at the time of peak-flow conditions and likely reduced the peak discharge at the lake outlet by about 6%. The modeled peak outlet flow is 0.85·106 m3 s-1. Energy balance calculations give an estimate for the erodibility coefficient for the alluvial Marsh Creek divide of ∼0.005 m y-1 Pa-1.5, at least two orders of magnitude greater than for the underlying bedrock at the outlet. Computing quasi steady-state water flows, water elevations, water currents and shear stresses as a function of the water-level drop in the lake and for the sequential stages of erosion in the outlet gives estimates of the incision rates and an estimate of the outflow hydrograph during the Bonneville Flood: About 18 days would have been required for the outflow to grow from 10

  6. 77 FR 74842 - Sunshine Act Meeting Notice

    Science.gov (United States)

    2012-12-18

    ... Wind North America LLC, and Horizon Wind Energy LLC v. Bonneville Power Administration. E-3 EL11-44-002... Horizon Wind Energy LLC v. Bonneville Power Administration. E-4 RM11-12-000 Availability of E-Tag... event is available through www.ferc.gov . Anyone with Internet access who desires to view this event can...

  7. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  8. Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Tiffan, Kenneth F.; Haskell, Craig A.; Kock, Tobias J.

    2008-12-01

    In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific

  9. Hydraulic alterations resulting from hydropower development in the Bonneville Reach of the Columbia River

    Science.gov (United States)

    Hatten, James R.; Batt, Thomas R.

    2010-01-01

    We used a two-dimensional (2D) hydrodynamic model to simulate and compare the hydraulic characteristics in a 74-km reach of the Columbia River (the Bonneville Reach) before and after construction of Bonneville Dam. For hydrodynamic modeling, we created a bathymetric layer of the Bonneville Reach from single-beam and multi-beam echo-sounder surveys, digital elevation models, and navigation surveys. We calibrated the hydrodynamic model at 100 and 300 kcfs with a user-defined roughness layer, a variable-sized mesh, and a U.S. Army Corps of Engineers backwater curve. We verified the 2D model with acoustic Doppler current profiler (ADCP) data at 14 transects and three flows. The 2D model was 88% accurate for water depths, and 77% accurate for velocities. We verified a pre-dam 2D model run at 126 kcfs using pre-dam aerial photos from September 1935. Hydraulic simulations indicated that mean water depths in the Bonneville Reach increased by 34% following dam construction, while mean velocities decreased by 58%. There are numerous activities that would benefit from data output from the 2D model, including biological sampling, bioenergetics, and spatially explicit habitat modeling.

  10. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at

  11. A Road Map for Success: How Northwest Manufactured Housing Conservation Efforts Revolutionized an Industry.

    Energy Technology Data Exchange (ETDEWEB)

    Gilbertson, William L.

    1993-04-01

    The evolution of an ongoing Bonneville Power Administration effort to improve the energy efficiency of manufactured homes is chronicled in this informal history. Over the past nine years, Bonneville`s manufactured housing project has undertaken many activities, including technical studies, cooperative ventures, design studies, and information dissemination. These activities are covered.

  12. Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael CW; Balducci, Patrick J.; Jin, Chunlian; Nguyen, Tony B.; Elizondo, Marcelo A.; Viswanathan, Vilayanur V.; Guo, Xinxin; Tuffner, Francis K.

    2010-04-01

    Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

  13. Exchange of current BPA surplus power for future power from certain companies' share of WNP-3 to settle a dispute over construction delay. Record of decision. Volume I

    International Nuclear Information System (INIS)

    1985-01-01

    This Record of Decision (ROD) sets forth the Bonneville Power Administration's (BPA) reasons for settling litigation over the delay in constructing Washington Public Power Supply System (Supply System) Nuclear Project No. 3 (WNP-3). The litigation concerns the decision in May 1983 to defer construction until financing becomes available to the Supply System and a demonstrable need for the Project is established. The construction deferral was made at the request of the Administrator of BPA, a federal power marketing agency in the Pacific Northwest. BPA is obligated to pay principal and interest on bonds sold by the Supply System to finance 70 percent of the project. The construction delay was opposed by the project's minority owners, four Northwest investor-owned utilities (companies) which collectively own 30 percent of the project

  14. BPA Statutes.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1999-08-01

    This report contains the Bonneville Power Administration's (BPA's) authorizing statutes--the Bonneville Project Act, the Federal Columbia River Transmission System Act, the Pacific Northwest Electric Power Planning and Conservation Act and other laws that contain provisions that define BPA's mission and affect the way it is carried out.

  15. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam, Annual Progress Report April 2006 - March 2007. Report C

    Science.gov (United States)

    Parsley, M.J.; Kofoot, P.

    2008-01-01

    Describe reproduction and early life history characteristics of white sturgeon populations in the Columbia River between Bonneville and Priest Rapids dams. Define habitat requirements for spawning and rearing white sturgeon and quantify the extent of habitat available in the Columbia River between Bonneville and Priest Rapids dams. Progress updates on young-of-the-year recruitment in Bonneville Reservoir and indices of white sturgeon spawning habitat for 2006 for McNary, John Day, The Dalles, and Bonneville dam tailrace spawning areas.

  16. Saying Goodbye to 'Bonneville' Crater

    Science.gov (United States)

    2004-01-01

    [figure removed for brevity, see original site] Annotated Image NASA's Mars Exploration Rover Spirit took this panoramic camera image on sol 86 (March 31, 2004) before driving 36 meters (118 feet) on sol 87 toward its future destination, the Columbia Hills. This is probably the last panoramic camera image that Spirit will take from the high rim of 'Bonneville' crater, and provides an excellent view of the ejecta-covered path the rover has journeyed thus far. The lander can be seen toward the upper right of the frame and is approximately 321 meters (1060 feet) away from Spirit's current location. The large hill on the horizon is Grissom Hill. The Colombia Hills, located to the left, are not visible in this image.

  17. 75 FR 39241 - Hooper Springs Project

    Science.gov (United States)

    2010-07-08

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Hooper Springs Project AGENCY: Bonneville... (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs... proposed project would address voltage stability and reliability concerns of two of BPA's full requirements...

  18. Pleistocene Lake Bonneville and Eberswalde Crater of Mars: Quantitative Methods for Recognizing Poorly Developed Lacustrine Shorelines

    Science.gov (United States)

    Jewell, P. W.

    2014-12-01

    The ability to quantify shoreline features on Earth has been aided by advances in acquisition of high-resolution topography through laser imaging and photogrammetry. Well-defined and well-documented features such as the Bonneville, Provo, and Stansbury shorelines of Late Pleistocene Lake Bonneville are recognizable to the untrained eye and easily mappable on aerial photos. The continuity and correlation of lesser shorelines must rely quantitative algorithms for processing high-resolution data in order to gain widespread scientific acceptance. Using Savitsky-Golay filters and the geomorphic methods and criteria described by Hare et al. [2001], minor, transgressive, erosional shorelines of Lake Bonneville have been identified and correlated across the basin with varying degrees of statistical confidence. Results solve one of the key paradoxes of Lake Bonneville first described by G. K. Gilbert in the late 19th century and point the way for understanding climatically driven oscillations of the Last Glacial Maximum in the Great Basin of the United States. Similar techniques have been applied to the Eberswalde Crater area of Mars using HRiSE DEMs (1 m horizontal resolution) where a paleolake is hypothesized to have existed. Results illustrate the challenges of identifying shorelines where long term aeolian processes have degraded the shorelines and field validation is not possible. The work illustrates the promises and challenges of indentifying remnants of a global ocean elsewhere on the red planet.

  19. The future of GPS-based electric power system measurements, operation and control

    Energy Technology Data Exchange (ETDEWEB)

    Rizy, D.T. [Oak Ridge National Lab., TN (United States); Wilson, R.E. [Western Area Power Administration, Golden, CO (United States); Martin, K.E.; Litzenberger, W.H. [Bonneville Power Administration, Portland, OR (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Overholt, P.N. [Dept. of Energy, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States)

    1998-11-01

    Much of modern society is powered by inexpensive and reliable electricity delivered by a complex and elaborate electric power network. Electrical utilities are currently using the Global Positioning System-NAVSTAR (GPS) timekeeping to improve the network`s reliability. Currently, GPS synchronizes the clocks on dynamic recorders and aids in post-mortem analysis of network disturbances. Two major projects have demonstrated the use of GPS-synchronized power system measurements. In 1992, the Electric Power Research Institute`s (EPRI) sponsored Phase Measurements Project used a commercially available Phasor Measurements Unit (PMU) to collect GPS-synchronized measurements for analyzing power system problems. In 1995, Bonneville Power Administration (BPA) and Western Area Power Administration (WAPA) under DOE`s and EPRI`s sponsorship launched the Wide Area Measurements (WAMS) project. WAMS demonstrated GPS-synchronized measurements over a large area of their power networks and demonstrated the networking of GPS-based measurement systems in BPA and WAPA. The phasor measurement technology has also been used to conduct dynamic power system tests. During these tests, a large dynamic resistor was inserted to simulate a small power system disturbance.

  20. 18 CFR 301.7 - Average System Cost methodology functionalization.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Average System Cost... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE SYSTEM COST METHODOLOGY FOR SALES FROM UTILITIES TO BONNEVILLE POWER ADMINISTRATION UNDER NORTHWEST POWER...

  1. The energy behind the power. Southwestern Power Administration 1994 annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This is the Southwestern Power Administration 1994 annual report. The topics of the report include a letter to the secretary; an overview including the mission statement, a description of the Southwestern Federal Power System, financial statement, performance measurements, national performance review; year in review, summary of results, financial and statistical data and the Southwestern Power Administration Organization.

  2. Constitutional Provisions And Administrative Disciplinary Powers ...

    African Journals Online (AJOL)

    Constitutional Provisions And Administrative Disciplinary Powers: The Medical ... and Dental Practitioners Act. This process of administrative adjudication is ... the rights guaranteed to the professionals when they appear before the Tribunal.

  3. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  4. Climate Change Impacts on Water and Energy for Army Installations

    Science.gov (United States)

    2015-09-01

    CO; Houston, TX; Santa Fe, NM, Salt Lake City, UT; Carson City and Los Vegas, NV; and San Fran- cisco , CA (Melillo, Richmond, and Yohe 2014). This...United States, have already affected the Bonneville Power Administration (BPA). BPA markets electric power from the Bonneville Dam located on the...the electricity generated in the Electricity Market Module (EMM) region* and therefore this work’s forecast of the increase in future electricity gen

  5. Variability in large-scale wind power generation: Variability in large-scale wind power generation

    Energy Technology Data Exchange (ETDEWEB)

    Kiviluoma, Juha [VTT Technical Research Centre of Finland, Espoo Finland; Holttinen, Hannele [VTT Technical Research Centre of Finland, Espoo Finland; Weir, David [Energy Department, Norwegian Water Resources and Energy Directorate, Oslo Norway; Scharff, Richard [KTH Royal Institute of Technology, Electric Power Systems, Stockholm Sweden; Söder, Lennart [Royal Institute of Technology, Electric Power Systems, Stockholm Sweden; Menemenlis, Nickie [Institut de recherche Hydro-Québec, Montreal Canada; Cutululis, Nicolaos A. [DTU, Wind Energy, Roskilde Denmark; Danti Lopez, Irene [Electricity Research Centre, University College Dublin, Dublin Ireland; Lannoye, Eamonn [Electric Power Research Institute, Palo Alto California USA; Estanqueiro, Ana [LNEG, Laboratorio Nacional de Energia e Geologia, UESEO, Lisbon Spain; Gomez-Lazaro, Emilio [Renewable Energy Research Institute and DIEEAC/EDII-AB, Castilla-La Mancha University, Albacete Spain; Zhang, Qin [State Grid Corporation of China, Beijing China; Bai, Jianhua [State Grid Energy Research Institute Beijing, Beijing China; Wan, Yih-Huei [National Renewable Energy Laboratory, Transmission and Grid Integration Group, Golden Colorado USA; Milligan, Michael [National Renewable Energy Laboratory, Transmission and Grid Integration Group, Golden Colorado USA

    2015-10-25

    The paper demonstrates the characteristics of wind power variability and net load variability in multiple power systems based on real data from multiple years. Demonstrated characteristics include probability distribution for different ramp durations, seasonal and diurnal variability and low net load events. The comparison shows regions with low variability (Sweden, Spain and Germany), medium variability (Portugal, Ireland, Finland and Denmark) and regions with higher variability (Quebec, Bonneville Power Administration and Electric Reliability Council of Texas in North America; Gansu, Jilin and Liaoning in China; and Norway and offshore wind power in Denmark). For regions with low variability, the maximum 1 h wind ramps are below 10% of nominal capacity, and for regions with high variability, they may be close to 30%. Wind power variability is mainly explained by the extent of geographical spread, but also higher capacity factor causes higher variability. It was also shown how wind power ramps are autocorrelated and dependent on the operating output level. When wind power was concentrated in smaller area, there were outliers with high changes in wind output, which were not present in large areas with well-dispersed wind power.

  6. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-05-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this booklet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  7. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rakowski, Cynthia L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Perkins, William A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Richmond, Marshall C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  8. Transition report, United States Department of Energy: A report to the President-Elect. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report is a description of the Department of Energy transition issues. The topics of the report include: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Defense Programs; New Production Reactors; Economic Regulatory Administration; Energy Information Administration; energy research; environment, safety and health; fossil energy; General Counsel; hearings and appeals, Inspector General, international affairs and energy emergencies; management and administration, minority economic impact; nuclear energy; policy, planning and analysis, radioactive waste management; and power marketing administrations: Bonneville Power Administration, Western Area Power Administration, Alaska Power Administration, Southeastern Power Administration, and Southwestern Power Administration.

  9. Northwest power gamble: Washington utilities go for broke on nuclear; region's citizens make conservation bid

    International Nuclear Information System (INIS)

    Brummer, J.

    1981-01-01

    The Washington Public Power Supply System (WPPSS) is asking for a reactor construction moratorium in an effort to get fast relief from the Bonneville Power Administration (BPA), which is authorized to guarantee power purchases from new power plants. Supporters of nuclear power plants as well as those of the soft energy path are watching to see how BPA will handle its mandate against acquiring new thermal plants until conservation and renewable energy potentials are exhausted. BPA can subvert the Pacific Northwest Power Act with 20-year contracts based on conventional forecasts despite evidence that new plants are unneeded. There is also evidence that the public rejects the idea of a moral obligation to bail out nuclear power cost overruns at taxpayer expense. The negotiations involve not only WPPSS and BPA, but Moody's Investor Service and environmental groups

  10. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-11-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

  11. LGR adult trap data - Operation of the adult trap at Lower Granite Dam

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This Bonneville Power Administration (BPA) - funded project pays for NOAA staff to operate the adult salmon trap located in the fish ladder at Lower Granite Dam. The...

  12. Water Quality - Monitoring the migrations of wild Snake River spring/summer Chinook salmon juveniles

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This is an ongoing Bonneville Power Administration funded project to annually collect, PIT tag, and release wild Chinook salmon parr in up to 17 streams of the...

  13. PIT Tag data - Monitoring the migrations of wild Snake River spring/summer Chinook salmon juveniles

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This is an ongoing Bonneville Power Administration funded project to annually collect, PIT tag, and release wild Chinook salmon parr in up to 17 streams of the...

  14. Above Bonneville passage and propagation cost effectiveness analysis

    International Nuclear Information System (INIS)

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region

  15. Above Bonneville Passage and Propagation Cost Effectiveness Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

    1993-05-01

    We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region.

  16. Acquiring energy savings in manufactured housing

    International Nuclear Information System (INIS)

    Davey, D.

    1993-01-01

    In 1991, the Northwest utilities faced a complex situation. They needed new sources of electrical power to avoid future deficits. A significant block of energy savings was available in the manufactured housing sector in the form of energy savings from increased insulation to new manufactured homes. The manufacturers were interested in saving the electricity in the homes, but would only deal with the utility sector as a whole. Half of the homes targeted were sited in investor-owned utility (IOU) service territories, and half in the public sector made up of utilities that purchased some or all of their electricity from the Bonneville Power Administration. Utilities agreed to acquire energy from manufacturers In the form of thermal efficiency measures specified by the Bonneville Power Administration. The program that resulted from over one year of negotiations was called the Manufactured Housing Acquisition Program, or MAP. Manufacturers, the utilities, State Energy Offices, the Northwest Power Planning Council and Bonneville all worked closely and with tenacity to build the program that went into effect on April 1, 1992, and should save the region between 7 and 9 megawatts, enough energy to supply 11,000 homes in the Northwest

  17. Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

    2001-05-01

    This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

  18. 18 CFR 301.5 - Changes in Average System Cost methodology.

    Science.gov (United States)

    2010-04-01

    ... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE... customers, or from three-quarters of Bonneville's direct-service industrial customers may initiate a...

  19. Western Area Power Administration. Combined power system financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-26

    This report presents the results of the independent certified public accountants` audit of the Western Area Power Administration`s combined power system statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Westerns internal control structure disclosed three new reportable conditions concerning the lack of: (1) a reconciliation of stores inventory from subsidiary ledgers to summary financial information, (2) communication of interest during construction and related adjustments to interest on Federal investment, and (3) a system to prevent and detect power billing errors. None of the conditions were considered to be material weaknesses. Western provided concurrence and corrective action plans. The auditors` report on Western`s compliance with laws and regulations also disclosed two new instances of noncompliance. Western failed to calculate nonreimbursable expenses in accordance with the Grand Canyon Protection Act and had an unexplained difference in gross Federal investment balances used to calculate interest on Federal investment. Western provided concurrence and corrective action plans for the instances.

  20. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  1. On the Use of Energy Storage Technologies for Regulation Services in Electric Power Systems with Significant Penetration of Wind Energy

    DEFF Research Database (Denmark)

    Yang, Bo; Makarov, Yuri; Desteese, John

    2008-01-01

    Energy produced by intermittent renewable resources is sharply increasing in the United States. At high penetration levels, volatility of wind power production could cause additional problems for the power system balancing functions such as regulation. This paper reports some partial results...... and frequently changing regulation signal. Several energy storage options have been analyzed based on thirteen selection criteria. The evaluation process resulted in the selection of flywheels, pumped hydro electric power (or conventional hydro electric power) plant and sodium sulfur or nickel cadmium batteries...... of a project work, recently conducted by the Pacific Northwest National Laboratory (PNNL) for Bonneville Power Administration (BPA). The project proposes to mitigate additional intermittency with the help of Wide Area Energy Management System (WAEMS) that would provide a two-way simultaneous regulation service...

  2. Pacific Lamprey Research and Restoration : Annual Report 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, Aaron D.; Hatch, Douglas R.; Close, David A.

    1998-08-05

    The once abundant stocks of Pacific lamprey (Lampetra tridentata) above Bonneville Dam are currently depressed (Close et al. 1995). It is likely that many of the same factors that led to the decline of wild stocks of Columbia River Pacific salmon and steelhead have impacted Pacific lamprey populations as well. The Pacific Lamprey Research and Restoration Project, funded by Bonneville Power Administration, is a cooperative effort between the Confederated Tribes of the Umatilla Indian Reservation, the Columbia River Inter-Tribal Fish Commission, and Oregon State University with the goal to increase Pacific lamprey stocks above Bonneville Dam.

  3. Draft Environmental Impact Statement: BPA/Puget Power Northwest Washington Transmission Project

    International Nuclear Information System (INIS)

    1993-11-01

    Bonneville Power Administration (BPS) and Puget Sound Power ampersand Light (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the city of Bellingham starting in 1995. The upgrades of the interconnected 230,000 volt (230-kV) and 115-kV systems are needed to increase the reliability of the local transmission system and to increase the import capacity on a nearby US-Canada 500-kV intertie by about 850 megawatts (MW). The increase in north-south transfer capability would be shared by BPA and Puget Power (about 425 MW each). Other actions would include replacement of an existing BPA 230-kV single-circuit, wood-pole H-frame transmission line with a lattice-steel double-circuit line; an existing Puget Power 115-kV single wood-pole transmission line rebuild, two short 115-kV Puget Power lines added at BPA's Bellingham Substation; and improvements made at existing BPA and Puget Power substations

  4. Environmental Assessment for power marketing policy for Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Southwestern Power Administration (Southwestern) needs to renew expiring power sales contracts with new term (10 year) sales contracts. The existing contracts have been in place for several years and many will expire over the next ten years. Southwestern completed an Environmental Assessment on the existing power allocation in June, 1979 (a copy of the EA is attached), and there are no proposed additions of any major new generation resources, service to discrete major new loads, or major changes in operating parameters, beyond those included in the existing power allocation. Impacts from a no action plan, proposed alternative, and market power for less than 10 years are described.

  5. Environmental Assessment for power marketing policy for Southwestern Power Administration

    International Nuclear Information System (INIS)

    1993-01-01

    Southwestern Power Administration (Southwestern) needs to renew expiring power sales contracts with new term (10 year) sales contracts. The existing contracts have been in place for several years and many will expire over the next ten years. Southwestern completed an Environmental Assessment on the existing power allocation in June, 1979 (a copy of the EA is attached), and there are no proposed additions of any major new generation resources, service to discrete major new loads, or major changes in operating parameters, beyond those included in the existing power allocation. Impacts from a no action plan, proposed alternative, and market power for less than 10 years are described

  6. Monitoring of downstream salmon and steelhead trout at federal hydroelectric facilities, annual report 2001.; ANNUAL

    International Nuclear Information System (INIS)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    2002-01-01

    The seaward migration of juvenile salmonids was monitored by the Pacific States Marine Fisheries Commission (PSMFC) at John Day Dam, located at river mile 216, and at Bonneville Dam, located at river mile 145 on the Columbia River (Figure 1). The PSMFC Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council's Fish and Wildlife Program and is funded by the Bonneville Power Administration

  7. Electric Power Lines : Questions and Answers on Research into Health Effects.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-06-01

    Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the EMF (electric and magnetic fields) produced by power lines and other electrical devices affect our health. Although no adverse health effects of electric power EMF have been confirmed, there is continued scientific uncertainty about this issue. Research on EMF is ongoing throughout the world. The purpose of this booklet is to answer some common questions that the BPA (Bonneville Power Administration) receives about the possible effects of power lines on health. First, some basic electrical terms are defined, and electric and magnetic fields are debed. Next, answers are given to several questions about recent scientific studies. Some important information about electrical safety follows. We then describe how BPA is addressing public concerns about potential health effects of power lines. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this booklet.

  8. Southwestern Power Administration Annual Report 2012

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  9. Southwestern Power Administration Annual Report 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-09-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  10. Southwestern Power Administration Annual Report 2011

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-04-01

    Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

  11. Regulatory Powers in Public Procurement Law of Peruvian Administrative Agencies

    Directory of Open Access Journals (Sweden)

    Juan Carlos Morón Urbina

    2017-12-01

    Full Text Available Peruvian law has explicitly recognized regulatory powers to administrative agencies, which allows them to have a preponderant role in the production of rules in public procurement. Although these delegations of legislative authority are positively defined, distortions in the system of legal sources arise when agencies exceed delegated powers or when measures issued by administrative entities are mistaken for regulations. This paper aims to identify regulatory powers of Peruvian administrative agencies, as well as the regulatory measures they issue, and their relation with other sources of law.

  12. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2)

    Energy Technology Data Exchange (ETDEWEB)

    Barndt, Shawn L. [Bonneville Power Administration, Portland, OR (United States)

    2003-04-04

    Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon #2). Bonneville Power Administration proposes to remove vegetation alongside Transmission Right-of-Ways

  13. Late Pleistocene Hansel Valley basaltic ash, northern Lake Bonneville, Utah, USA

    Science.gov (United States)

    Miller, D.M.; Oviatt, Charles G.; Nash, B.P.

    2008-01-01

    The Hansel Valley ash bed lies within 5 cm of the base of deposits of Lake Bonneville (???28 ka) in the vicinity of Great Salt Lake and provides a useful stratigraphic marker for this area of the lake basin. However, it has not been matched to an eruptive edifice, presumably because such an edifice was eroded by waves of Lake Bonneville. We present data for the chemical composition of the tephra and for possible matching lavas and tephras of the region, as well as grain size data for the tephra in an attempt to identify the location of the eruption. Matches with other tephras are negative, but lavas near the coarsest ash deposits match well with the distinctive high values of TiO2 and P2O5 of the ash. Neither chemistry nor grain size data points uniquely to a source area, but an area near the northwest shore of Great Salt Lake and within Curlew Valley is most likely. The Hansel Valley ash is an example of an ash that has no direct numerical date from proximal deposits, despite considerable study, yet nonetheless is useful for stratigraphic studies by virtue of its known stratigraphic position and approximate age. Basaltic tephras commonly are not as widespread as their rhyolitic counterparts, and in some cases apparently are produced by eruptive sources that are short lived and whose edifices are not persistent. ?? 2007 Elsevier Ltd and INQUA.

  14. 48 CFR 915.404-4 - Profit.

    Science.gov (United States)

    2010-10-01

    ... TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-4 Profit. (c)(4)(i) Contracting officer...) and Bonneville Power Administration (BPA) functions. Pursuant to section 602(d) (13) and (20) of the...

  15. 77 FR 26001 - Qualified Hydro 15, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-05-02

    ... have trash racks added. The existing 1,800-foot-long concrete-lined outlet tunnel would be lined with... Bonneville Power Administration Blue River substation; and (8) appurtenant facilities. The estimated annual...

  16. Bonneville - Hood River Vegetation Management Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  17. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  18. A Study to Determine the Biological Feasibility of a New Fish Tagging System; Annual Report 1994-1996.

    Energy Technology Data Exchange (ETDEWEB)

    Downing, Sandra L.; Frost, Deborah A.; Jonasson, Bruce F.; Nunnallee, Edmund P.; Peterson, Bradley W.; Prentice, Earl F.; Snell, Glen A.

    1998-11-01

    A multiyear program to evaluate the technical and biological feasibility of a new identification system for salmonids established between the Bonneville Power Administration (BPA) and the National Marine Fisheries Service (NMFS) in 1983.

  19. Evaluation of a Low-Cost Salmon Production Facility; 1988 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hill, James M.; Olson, Todd

    1989-05-01

    This fiscal year 1988 study sponsored by the Bonneville Power Administration evaluates an existing, small-scale salmon production facility operated and maintained by the Clatsop County Economic Development Committee's Fisheries Project.

  20. Columbia River Basin Seasonal Volumes and Statistics, 1928-1989. 1990 Level Modified Streamflows Computed Seasonal Volumes 61-Year Statistics.

    Energy Technology Data Exchange (ETDEWEB)

    A.G. Crook Company

    1993-04-01

    This report was prepared by the A.G. Crook Company, under contract to Bonneville Power Administration, and provides statistics of seasonal volumes and streamflow for 28 selected sites in the Columbia River Basin.

  1. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  2. 29 CFR 102.35 - Duties and powers of administrative law judges; stipulations of cases to administrative law...

    Science.gov (United States)

    2010-07-01

    ..., the judge (or the Board) will decide the case or make other disposition of it. (10) To make and file... 29 Labor 2 2010-07-01 2010-07-01 false Duties and powers of administrative law judges; stipulations of cases to administrative law judges or to the Board; assignment and powers of settlement judges...

  3. Operating years 1993 through 1995 power purchases

    International Nuclear Information System (INIS)

    1991-12-01

    Bonneville Power Administration (BPA) is obligated to supply electric power to its contractual customers. Based on a forecast of growing customer loads and assuming Critical Period water conditions in the Columbia River Basin, BPA is planning to meet a firm energy deficit during the four operating years (OY) 1992 through 1995, i.e., August 1991 through July 1995. BPA has executed several power purchase agreements to cover the projected OY 1992 deficit. The proposed action is to extend two existing one-year power purchase agreements for an additional three years to cover the four-year Critical Period energy deficit. The extension of these two one-year power purchase agreements would: (1) increase BPA's firm energy load-carrying capability; (2) allow BPA to meet its firm energy contractual commitments over the remaining three years of the four-year Critical Period from August 1, 1992, to July 31, 1995; (3) provide flexibility for BPA's use of hydroelectric resources over the Critical Period; and (4) increase system reliability. Under Critical Period water conditions, absent the proposed action, projected loads would exceed the capability of the Federal power system to serve those loads. The purpose of BPA's proposed action is to assure consistency with its statutory responsibilities, including those found in the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act)

  4. Energy and water development appropriations for 1986. Part 7. Hearings before a Subcommittee of the Committee on Appropriations, House of Representatives, Ninety-Ninth Congress, First Session

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    Part 7 of the hearing record covers three areas of the DOE appropriations: Atomic Energy Defense activities, power marketing administrations, and departmental administration. Representatives of DOE and the US Army reviewed the nuclear defense mission and activities under the defense and arms control programs. The administrators of the Alaska, Bonneville, Southeastern, Southwestern, and Western Power Administrations and a representative of the Conservation and Renewable Energy division described programs and budget requirements, as well as estimates of power demands for their regions. Administrative personnel described DOE procedures and explained the budget requests. Supporting documentation accompanies the testimony of the 16 witnesses

  5. From lab to field: Geotechnical properties for predicting embankment settlement on Lake Bonneville deposits

    International Nuclear Information System (INIS)

    Hoagland, K.C.; Sampaco, C.L.; Anderson, L.R.; Caliendo, J.A.; Rausher, L.; Keane, E.

    1994-01-01

    The results of a laboratory analysis, to determine geotechnical properties of lacustrine Lake Bonneville deposits, within the I-15 corridor of Salt Lake City, Utah, is presented. Laboratory vertical and horizontal consolidation coefficients are compared with those back-calculated from observed, field settlement data and linear relationships established. The results are used to select vertical and horizontal field coefficients and predict settlement rate of an existing embankment, scheduled for enlargement. 27 refs., 9 figs

  6. 77 FR 50979 - Northwest Forest Plan Provincial Advisory Committees

    Science.gov (United States)

    2012-08-23

    ... Division, Bonneville Power Administration, Department of Defense, and Natural Resources Conservation... community. The PACs may invite a representative of the State Community Economic [[Page 50980..., individuals with demonstrated ability to represent minorities, women, and persons with disabilities. Dated...

  7. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  8. 76 FR 59394 - Big Eddy-Knight Transmission Project

    Science.gov (United States)

    2011-09-26

    ... DEPARTMENT OF ENERGY Bonneville Power Administration Big Eddy-Knight Transmission Project AGENCY... Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. Construction of the Big Eddy-Knight Transmission Project will accommodate long-term firm transmission requests...

  9. 18 CFR 35.30 - General provisions.

    Science.gov (United States)

    2010-04-01

    ... utilities to the Administrator of the Bonneville Power Administration (BPA) at the average system cost (ASC... determined by BPA in accordance with 18 CFR part 301. (b) Effectiveness of rates. (1) During the period... requirements. Within 15 business days of the date of issuance of the BPA report on a utility's ASC, the utility...

  10. Columbia River : Terminal Fisheries Research Report : Annual Report 1994.

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, Paul; Miller, Marc; Hill, Jim

    1996-12-01

    In 1993 the Northwest Power Planning Council recommended in its Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin.

  11. BPA Prepares for the 21st Century.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-04-01

    This is a brief review of the state of the Bonneville Power Administration. It reviews BPA`s competitive status, fish and wildlife funding, cost structure of the federal system, subscription sales of electricity, emergency cost recovery, cost reduction measures, transmission access and operation, and the 1998 power rate case decision making process.

  12. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    Energy Technology Data Exchange (ETDEWEB)

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  13. Relative survival of juvenile chinook salmon (Oncorhynchus tshawyischa) through a Bonneville dam on the Columbia River

    International Nuclear Information System (INIS)

    Ferguson, J.

    1993-01-01

    The Bonneville Dam second powerhouse bypass system for juvenile salmon has one 6.1-m submersible travelling screen in each intake of all eight turbines, for a total of 24 screens. These screens set up a hydraulic cushion that deflects juvenile salmon away from the turbine intakes and into vertical bulkhead slots, from which they exit by their own volition into a collection gallery that travels the length of the powerhouse to a dewatering station and the outlet. A multiple-year evaluation was conducted on the comparative survival of subyearling chinook salmon through various passage modes at the dam. Using this information, operational scenarios could then be formulated to provide additional juvenile protection while meeting power system demands. In the summer, the juvenile salmon that passed through the bypass system had significantly lower survival rates than upper and lower turbine, spillway, and downstream control groups. Predation by northern squawfish (Ptychocheilus oregonensis) was suspected to have been the cause of high mortalities among bypassed fish. No significant differences existed between survival rates of upper and lower turbine groups. 7 refs., 2 figs., 1 tab

  14. Institutional obligation

    International Nuclear Information System (INIS)

    Rowan, S.S.; Berwager, S.D.

    1988-01-01

    The institutional obligation is to act to meet primary responsibilities in the face of risks. There are risks involved in taking action, both of a quantifiable and unquantifiable nature. This paper explores weighing the risks, choosing approaches that balance primary obligations with broader ones, and presenting ethical philosophies upon which policies and strategies are based. Federal government organizations and utilities--and Bonneville Power Administration qualifies as both--have a variety of responsibilities to the public they serve. The common responsibility is that of service; for Bonneville the primary responsibility is to serve the energy related needs. It is this primary institutional obligation, as it relates to other responsibilities--and the resulting strategy for handling indoor air quality in Bonneville's new homes program--that this paper examines

  15. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  16. Continental Illinois National Bank v. Washington: does the contract clause mandate the completion of nuclear power plants at all costs

    International Nuclear Information System (INIS)

    Snowden, E.A.

    1984-01-01

    Although the Washington Public Power Supply System (WPPSS)/Bonneville Power Administration (BPA) contracts were substantially impaired, the reasoning by which the Ninth Circuit court found the WPPSS/bondholders contracts to be unconstitutionally impaired is flawed. Because none of the cases before or since United States Trust have found legislation unconstitutional without a showing of a substantial impairment, the case should be limited to its facts and not used as a precedent. The relative burdens imposed on the bondholders by stopping construction are small compared to the cost to the ratepayers of completing unneeded plants. The court should have upheld the cost study requirement of Initiative 394 even if it believed the voter approval requirement was unjustified. The cost study requirement's impairment of the contracts was negligible or nonexistant. 130 references

  17. Monitoring of downstream salmon and steelhead at Federal hydroelectric facilities. Annual report 1993

    International Nuclear Information System (INIS)

    Wood, L.A.; Martinson, R.D.; Graves, R.J.; Carroll, D.R.; Killins, S.D.

    1994-04-01

    The seaward migration of juvenile salmonids was monitored by the National Marine Fisheries Service (NMFS) at Bonneville and John Day Dams on the Columbia River in 1993 (river mile 145 and 216, respectively, Figure 1). The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program (SMP) coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Authority. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration. The purpose of the SMP is to index Columbia Basin juvenile salmonid stocks and develop and implement flow and spill requests intended to facilitate fish passage. Data is also used for travel time, migration timing and relative run size magnitude analysis. The purpose of the NMFS portion of the program is to provide FPC with species specific data; numbers, condition, length, brand recaptures and flow data from John Day, and Bonneville Dams on a daily basis

  18. The Pacific Northwest residential consumer: Perceptions and preferences of home heating fuels, major appliances, and appliance fuels

    Energy Technology Data Exchange (ETDEWEB)

    Harkreader, S.A.; Hattrup, M.P.

    1988-09-01

    In 1983 the Bonneville Power Administration contracted with the Pacific Northwest Laboratory (PNL) to conduct an analysis of the marketing environment for Bonneville's conservation activities. Since this baseline residential study, PNL has conducted two follow up market research projects: Phase 2 in 1985, and Phase 3, in 1988. In this report the respondents' perceptions, preferences, and fuel switching possibilities of fuels for home heating and major appliances are examined. To aid in effective target marketing, the report identifies market segments according to consumers' demographics, life-cycle, attitudes, and opinions.

  19. Sustaining the Northwest way of life

    International Nuclear Information System (INIS)

    1991-08-01

    These Discussion Papers are from a number of organizations with a high stake in the future performance of the Bonneville Power Administration. Bonneville solicited papers from other organizations to assure a broaded-based discussion of the topics for the 1991 Programs in Perspective. PIP meetings will be held throughout the Northwest in September. PIP runs on a two-year cycle. The first year is aimed at discussion of broad, strategic issues. The second year evaluates specific program levels for all Bonneville programs and test them for affordability against financial constraints. This year's PIP focuses on strategic-issues discussion. It specifically asks for regional discussion to help put some flesh on the skeleton of Bonneville's own vision for its future: ''Best for the Northwest Through Teamwork B... P... A... The Most Competitive and Socially Responsible Power System in the Nation'' Specific topics are (1) achieving social responsibility and (2) conserving Northwest competitiveness. Bonneville executives chose this vision as a means of directing the organization into and beyond the 1990s. It guides the 3000 plus employees of the agency in their day-to-day operations. By asking for discussion of the terms ''Most Competitive'' and ''Socially Responsible'' in the 1991 PIP, Bonneville intends to better understand the diverse needs of its customers and constituents, and to become of even greater service to the Northwest. The papers are designed to help stimulate thought about the dimensions of the future direction of BPA. Bonneville intends that the real substance of PIP will occur in the meetings themselves. We hope that these papers will provoke new thinking, and that the interchange of views in the meetings will produce new approaches to the issues

  20. 26 CFR 1.675-1 - Administrative powers.

    Science.gov (United States)

    2010-04-01

    ... consideration in money or money's worth. Whether the existence of the power itself will constitute the holder an... trust and the circumstances surrounding its creation and administration. (c) Authority of trustee. The... property or income for less than an adequate and full consideration in money or money's worth, or is...

  1. Evaluation of carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 1 of 4, Final report

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Johnson, G.E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity

  2. Hydrology and surface morphology of the Bonneville Salt Flats and Pilot Valley Playa, Utah

    Science.gov (United States)

    Lines, Gregory C.

    1979-01-01

    The Bonneville Salt Flats and Pilot Valley are in the western part of the Great Salt Lake Desert in northwest Utah. The areas are separate, though similar, hydrologic basins, and both contain a salt crust. The Bonneville salt crust covered about 40 square miles in the fall of 1976, and the salt crust in Pilot Valley covered 7 square miles. Both areas lack any noticeable surface relief (in 1976, 1.3 feet on the Bonneville salt crust and 0.3 foot on the Pilot Valley salt crust).The salt crust on the Salt Flats has been used for many years for automobile racing, and brines from shallow lacustrine deposits have been used for the production of potash. In recent years, there has been an apparent conflict between these two major uses of the area as the salt crust has diminished in both thickness and extent. Much of the Bonneville Racetrack has become rougher, and there has also been an increase in the amount of sediment on the south end of the racetrack. The Pilot Valley salt crust and surrounding playa have been largely unused.Evaporite minerals on the Salt Flats and the Pilot Valley playa are concentrated in three zones: (1) a carbonate zone composed mainly of authigenic clay-size carbonate minerals, (2) a sulfate zone composed mainly of authigenic gypsum, and (3) a chloride zone composed of crystalline halite (the salt crust). Five major types of salt crust were recognized on the Salt Flats, but only one type was observed in Pilot Valley. Geomorphic differences in the salt crust are caused by differences in their hydrologic environments. The salt crusts are dynamic features that are subject to change because of climatic factors and man's activities.Ground water occurs in three distinct aquifers in much of the western Great Salt Lake Desert: (1) the basin-fill aquifer, which yields water from conglomerate in the lower part of the basin fill, (2) the alluvial-fan aquifer, which yields water from sand and gravel along the western margins of both playas, and (3) the

  3. Regional economic impacts of changes in electricity rates resulting from Western Area Power Administration`s power marketing alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Allison, T.; Griffes, P.; Edwards, B.K.

    1995-03-01

    This technical memorandum describes an analysis of regional economic impacts resulting from changes in retail electricity rates due to six power marketing programs proposed by Western Area Power Administration (Western). Regional economic impacts of changes in rates are estimated in terms of five key regional economic variables: population, gross regional product, disposable income, employment, and household income. The REMI (Regional Impact Models, Inc.) and IMPLAN (Impact Analysis for Planning) models simulate economic impacts in nine subregions in the area in which Western power is sold for the years 1993, 2000, and 2008. Estimates show that impacts on aggregate economic activity in any of the subregions or years would be minimal for three reasons. First, the utilities that buy power from Western sell only a relatively small proportion of the total electricity sold in any of the subregions. Second, reliance of Western customers on Western power is fairly low in each subregion. Finally, electricity is not a significant input cost for any industry or for households in any subregion.

  4. Office of Inspector General report on audit of the Western Area Power Administration`s contract with Basin Electric Power Cooperative

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-25

    At the request of the Western Area Power Administration (Western), an audit of 17 areas was conducted with respect to possible overcharges on a power contract between Western and Basin Electric Power Cooperative (Basin), Contract No. DE-MP65-82WP-19001. The contract for Western`s purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. During this 58-month period, Basin billed Western approximately $197.6 million. Overall, it was found that Basin overcharged Western approximately $23.8 million. These overcharges occurred because Basin: (1) did not recognize or amortize as gain its overestimate of completion and correction costs for Antelope Valley Station (AVS) Unit 2; (2) did not amortize the gain on the sale/leaseback of AVS Unit 2 as an offset to lease costs; (3) billed Western prematurely for lease and interest costs; (4) overcharged for the cost of coal by including administrative and general expenses and profit, as well as incorrectly calculating discounts, royalty payments, and imputed interest costs; (5) made faulty calculations of amortization rates for deferred costs; (6) used a shorter depreciation period for AVS common facilities than it had used for other power plants; (7) retained tax benefit transfers; and (8) charged Western for interest and depreciation that had been paid by others. In addition to the $23.8 million in overcharges, interest accrued on the overcharges through December 31, 1996 was estimated to be approximately $22.1 million, resulting in a total of $45.9 million due Western.

  5. Business plan: Supplemental draft environmental impact statement. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS

  6. 2008 NWFSC Tidal Freshwater Genetics Results

    Energy Technology Data Exchange (ETDEWEB)

    David Teel

    2009-05-01

    Genetic Analysis of Juvenile Chinook Salmon for inclusion in 'Ecology of Juvenile Salmon in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta, Lower Columbia River, 2008. Annual Report to Bonneville Power Administration, Contract DE-AC05-76RL01830.'

  7. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  8. 76 FR 36532 - Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North...

    Science.gov (United States)

    2011-06-22

    ... Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, Horizon Wind...), Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC (Complainants) filed a formal complaint against Bonneville Power Administration...

  9. 77 FR 2286 - Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North...

    Science.gov (United States)

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-44-000] Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, Horizon Wind Energy LLC v. Bonneville Power Administration; Notice of Designation of Certain Commission Personnel as...

  10. Process Document for the Conservation Competitive Bidding Pilot Program.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-09-01

    Bonneville Power Administration (Bonneville) is proposing to test competitive bidding for Conservation Resources to expand its existing resource acquisition capabilities. Competitive bidding may target specific types of electric end-uses or end-use sectors. It is a new acquisition approach through which Bonneville seeks to acquire resources that are not acquired through other existing or planned conservation programs. This proposal describes the conservation component of the all-source competitive acquisition approach that will be developed. It is expected that the combined resource acquisition effort will target about 100 average megawatts (aMW) as proposed in the 1990 Resource Program, although the exact amount has not yet been determined. Increasing the acquisition target will, to some extent, depend on whether the proposed pilot program is large enough to establish confidence in the approach.

  11. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  12. Western Area Power Administration combined power system financial statements, 30 September 1995 and 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The attached report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1995. The auditors have expressed an unqualified opinion on Western`s 1995 statements. Their reports on Western`s internal control structure and on compliance with laws and regulations are also provided.

  13. Teacher Views on School Administrators' Organizational Power Sources and Their Change Management Behaviours

    Science.gov (United States)

    Argon, Türkan; Dilekçi, Ümit

    2016-01-01

    This study aimed to determine school administrators' organizational power sources and change management behaviours based on Bolu central district primary and secondary school teachers' views. The study conducted with relational screening model reached 286 teachers. School Administrators' Organizational Power Sources Scale and Change Management…

  14. Sustaining the Northwest Way of Life.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration. Customer Services.

    1991-08-01

    These Discussion Papers are from a number of organizations with a high stake in the future performance of the Bonneville Power Administration. Bonneville solicited papers from other organizations to assure a broaded-based discussion of the topics for the 1991 Programs in Perspective. PIP meetings will be held throughout the Northwest in September. PIP runs on a two-year cycle. The first year is aimed at discussion of broad, strategic issues. The second year evaluates specific program levels for all Bonneville programs and test them for affordability against financial constraints. This year's PIP focuses on strategic-issues discussion. It specifically asks for regional discussion to help put some flesh on the skeleton of Bonneville's own vision for its future: Best for the Northwest Through Teamwork B... P... A... The Most Competitive and Socially Responsible Power System in the Nation'' Specific topics are (1) achieving social responsibility and (2) conserving Northwest competitiveness. Bonneville executives chose this vision as a means of directing the organization into and beyond the 1990s. It guides the 3000 plus employees of the agency in their day-to-day operations. By asking for discussion of the terms Most Competitive'' and Socially Responsible'' in the 1991 PIP, Bonneville intends to better understand the diverse needs of its customers and constituents, and to become of even greater service to the Northwest. The papers are designed to help stimulate thought about the dimensions of the future direction of BPA. Bonneville intends that the real substance of PIP will occur in the meetings themselves. We hope that these papers will provoke new thinking, and that the interchange of views in the meetings will produce new approaches to the issues.

  15. Southeastern Power Administration 2007 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2007-12-28

    Dear Secretary Chu: I am proud to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2007 Annual Report for your review. The information included in this report reflects Southeastern’s programs, accomplishments, and financial activities for the 12-month period beginning October 1, 2006 and ending September 30, 2007. Southeastern marketed more than 5 billion kilowatt-hours of energy to 492 wholesale Federal power customers in an 11-state marketing area in FY 2007. Revenues from the sale of this power totaled approximately $219 million. Drought conditions continued to plague the southeast region of the United States during 2007 placing strains on our natural and financial resources. Southeastern purchased more than $40 million in replacement power to meet customer contract requirements to ensure the continued reliability of our nation’s power grid. With the financial assistance and support of our Federal power customers, continued funding for capitalized equipment replacements at various Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for aging facilities. Southeastern’s cyber and physical security program continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation standards and requirements. Plans for the upcoming year include communication and cooperation with DOE, Federal power customers, and the Corps to maximize the benefits of our nation’s water resources. Competition for the use of water and the prolonged drought conditions will present another challenging year for our agency. The employees at Southeastern will be proactive in meeting these challenges and providing reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E. Legg Administrator

  16. 78 FR 15718 - Iberdrola Renewables, Inc. PacifiCorp NextEra Energy Resources, LLC Invenergy Wind North America...

    Science.gov (United States)

    2013-03-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-44-006] Iberdrola Renewables, Inc. PacifiCorp NextEra Energy Resources, LLC Invenergy Wind North America LLC Horizon Wind Energy LLC v. Bonneville Power Administration; Notice of Filing Take notice that on March 1, 2013...

  17. An Annotated Bibliography of HVDC Transmission and FACTS Devices, 1996-1997.

    Energy Technology Data Exchange (ETDEWEB)

    Litzenberger, Wayne H.; Varma, Rajiv K.; Flanagan, John D. [eds.

    1998-06-01

    This edition of the Annotated Bibliography of HVDC Transmission and FACTS Devices continues work begun in 1962 by the late Erik Bromberg, Bonneville Power Administration Librarian. His original bibliography covered the period 1932--1962. Subsequent editions were compiled by Bromberg, Val S. Lava, and Wayne Litzenberger, all of Bonneville Power Administration. Beginning with the 1991--1993 edition, the scope of the bibliography was expanded to include flexible ac transmission (FACTS) devices. This 1996--1997 edition also contains information for 1998. Preparation of the present edition took place primarily in May-June of 1998. All pertinent references have been included that were available to the editors at the time of preparation. Papers for the 1998 IEEE Winter and Summer Power Meetings and 1998 T and D Conference have been included. This edition contains the organizational affiliation of the first-named author as an aid to accessing the reference. Unfortunately, space limitations prevented the inclusion of the affiliations of all authors. Some minor editorial changes have been made to abstracts to ensure consistency in style and syntax.

  18. Business Case for Nonintrusive Load Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hao, He [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-05-01

    This report explores how utilities, researchers, and consumers could benefit from a lower cost approach to submetering using non-intrusive load monitoring (NILM). NILM is a process of using data from a single point of monitoring, such as a utility smart meter, to provide an itemized accounting of end use energy consumption in residential and small commercial buildings. Pacific Northwest National Laboratory (PNNL) prepared this report for the Bonneville Power Administration (BPA). PNNL participated in an advisory group as part of a research project sponsored by the U.S. Department of Energy (DOE), the Bonneville Power Administration, and the State of Washington. The Electric Power Research Institute (EPRI) convened the advisory committee for two workshops held to identify ways in which NILM may be used. PNNL, on behalf of DOE, helped to cosponsor the first of these workshops. Results of an end-use monitoring study of a bank branch conducted by PNNL are also presented for purposes of illustrating the need for better data in energy savings modeling (DOE 2013a).

  19. Southwestern Power Administration Annual Report 2008

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-12-01

    Dear Secretary Chu, I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2008. In FY 2008, Southwestern delivered over 7.3 billion kilowatt-hours of energy to its wholesale customers – nearly 31% more than average due to numerous record rainfall amounts in the southwest region. These record amounts produced revenues which exceeded the average annual revenue requirement by nearly $20 million and resulted in over $200 million in economic benefits to the region. Yet even as Southwestern exceeded its goals of marketing and delivering Federal hydroelectric power to our customers, we stayed focused on safety, security, and reliability. For example, we maintained our nearly 1,400 miles of high-voltage transmission lines, substations, and communications sites while achieving a Recordable Accident Frequency Rate of 0.0, a record that reflects Southwestern’s safety achievement of no recordable injuries for every 200,000 hours worked. We kept our rights-of-way secure from vegetation and other obstacles, work that not only supports our mission but also promotes reliability of the regional and National grid. We exceeded all North American Electric Reliability Corporation (NERC) Control Performance Standards (CPS- 1 and CPS-2), and maintained regulation and reserve obligations and reactive reserve margins to ensure the reliability of the bulk electric system, even during extended periods of restricted hydro operations due to unusually high project inflows. Finally, we continued our partnerships with the Department of Energy, the U.S. Army Corps of Engineers, our customers, and other Federal power stakeholders, partnerships that are vital to our continued success in marketing and delivering carbon-free, renewable, and domestically produced energy to our customers and to the Nation. Sincerely, Jon Worthington Administrator

  20. Transition report, United States Department of Energy: A report to the President-Elect. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report is a description of the Department of Energy organization and projects. The topics of the report include: (1) DOE organization and overview; (2) Headquarters Offices: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Contract Appeals; Defense Programs; Economic Regulatory Administration; Energy Information Administration; Energy Research; Environment, Safety and Health; Fossil Energy; General Counsel; Hearings and Appeals; Inspector General; International Affairs and Energy Emergencies; Management and Administration; Minority Economic Impact; New Production Reactors; Nuclear Energy; Policy, Planning and Analysis; Radioactive Waste Management; (3) Operations Offices: Albuquerque Operations Office; Chicago Operations Office; Idaho Operations Office; Nevada Operations Office; Oak Ridge Operations Office; Richland Operations Office; San Francisco Operations Office; Savannah River Operations Office; Laboratories; and (4) Power Administrations: Bonneville Power Administration; Western Area Power Administration.

  1. Snake River Sockeye Salmon Habitat and Limnological Research; 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Teuscher, David; Taki, Doug [Shoshone-Bannock Tribes, Fort Hall, ID

    1996-05-01

    This report contains studies which are part of the Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Attention is focused on population monitoring studies in the Sawtooth Valley Lakes. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  2. Evaluation of Carrying Capacity : Measure 7.1A of the Northwest Power Planning Council`s 1994 Fish and Wildlife Program : Report 1 of 4, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Johnson, Gary E.

    1996-05-01

    This report is one of four that the Pacific Northwest National Laboratory (PNNL) staff prepared to address Measure 7.1A in the Northwest Power Planning Council's (Council) Fish and Wildlife Program (Program) dated december 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for development of a study plan based on critical uncertainties and research needs identified during the evaluation. This report deals with the evaluation of carrying capacity. It describes the analysis of different views of capacity as it relates to salmon survival and abundance. The report ends with conclusions and recommendations for studying carrying capacity.

  3. Cryopreservation of Adult Male Spring and Summer Chinook Salmon Gametes in the Snake River Basin, 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Faurot, Dave; Kucera, Paul A.; Armstrong, Robyn D. (Nez Perce Tribe, Lapwai, ID)

    1998-06-01

    Chinook salmon populations in the Northwest are decreasing in number. The Nez Perce Tribe was funded in 1997 by the Bonneville Power Administration to coordinate and initiate gene banking of adult male gametes from Endangered Species Act (ESA) listed spring and summer chinook salmon in the Snake River basin.

  4. Southwestern Power Administration Annual Report 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-01-01

    “Renewable energy” isn’t just a catchphrase at Southwestern Power Administration (Southwestern). It describes the hydroelectric energy we market, and the energy that Southwestern’s employees bring to work every day, constantly challenging themselves to become more eff ective and effi cient in providing aff ordable, environmentally clean power to the American people. As Southwestern’s new Administrator, I have had the opportunity to view our operations from a fresh perspective, and I’m proud to share with you how a focus on continual improvement has been evident in accomplishments throughout the agency during fi scal year (FY) 2007. When the North American Electric Reliability Corporation (NERC) implemented new reliability standards, we met applicable implementation dates and exceeded NERC’s control performance standards throughout the year. When tasked with reducing the agency’s carbon footprint, we found ways to achieve an 8.7% reduction in energy intensity from last year without impacting our operational capabilities. And when faced with record-breaking infl ows into the reservoir projects from which we market power, we capitalized on the opportunity to provide customers with signifi cant quantities of supplemental energy. Our supplemental sales this year not only saved customers over $122 million, but increased Southwestern’s revenues -- a huge win-win for Southwestern’s ratepayers and the Nation’s taxpayers alike. Southwestern is proud of its role in protecting National and economic security by contributing to the diverse supply of domestically produced energy, operating and maintaining a safe and reliable transmission system, and ensuring good stewardship of our Nation’s water resources and environment. In FY 2007, Southwestern continued to repay all power costs to the American taxpayers by marketing and delivering approximately 5.6 billion kilowatthours of hydropower at cost-based rates to customers in our six-state region. This energy

  5. Exploring Paradoxes of Power in Small College Writing Administration Composition Studies

    Science.gov (United States)

    Jones, Libby Falk

    2004-01-01

    Drawing on concepts and practices from the fields of communication, conflict management, leadership, and feminist theory, as well as on her experience as a teacher-administrator, the author explores perceptions, sources, and consequences of power. She argues that effective small college writing administrators must understand the availability of…

  6. Southeastern Power Administration 2008 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-12-29

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern’s) fiscal year (FY) 2008 Annual Report for your review. The information included in this document reflects our agency’s programs, accomplishments, operational and financial activities for the 12-month period beginning October 1, 2007 and ending September 30, 2008. Southeastern marketed more than 4.5 billion kilowatt-hours of energy to 491 wholesale customers in ten southeastern states this past year. Revenues from the sale of this power totaled approximately $263 million. Drought conditions persisted in the southeastern region of the United States during FY 2008 placing strains on our natural and financial resources. Power purchases for FY 2008 totaled $91 million. Approximately $44 million of this amount was for replacement power which is paid only during adverse water conditions in order to meet our customers’ contract requirements. With the continued financial assistance and support of our Federal power customers, funding for capitalized equipment purchases and replacements at U.S. Army Corps of Engineers’ (Corps) hydroelectric projects provided much needed repairs and maintenance for these aging facilities. Southeastern’s cyber and physical security programs continued to be reviewed and updated to meet Department of Energy (DOE), Homeland Security, and North American Electric Reliability Corporation (NERC) standards and requirements. In the coming year, Southeastern will continue open communication and cooperation with DOE, the Federal power customers, and the Corps to maximize the benefits of our region’s water resources. Although competing uses of water and the prolonged drought conditions will present another challenging year for our agency, Southeastern’s employees will meet these challenges and continue to provide reliable hydroelectric power to the people in the southeast. Sincerely, Kenneth E.Legg Administrator

  7. Northeast Oregon Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1996-08-01

    Development of the hydropower system in the Columbia River Basin has had far-reaching effects on many species of wildlife. The Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the Federal portion of this system, as allocated to the purpose of power production. BPA needs to mitigate for loss of wildlife habitat in the Snake River Subbasin

  8. Puget Sound Reinforcement Project : Planning for Peak Power Needs : Scoping Report, Part A, Summary of Public Comments.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-07-01

    This report summarizes public participation in the environmental scoping process for the Puget Sound Reinforcement Project, a Bonneville Power Administration (BPA) and Puget Sound area utilities study of voltage stability in northwestern Washington state. The environmental scoping phase of the Puget Sound project consisted of a series of public meetings and a public comment period. The content of these meetings is summarized in 2.0, Public Involvement. In 3.0, Comment Summary, the report summarizes comments received via meetings, mail and phone. The report ends with a description of the next steps in the project. Chapter 4.0, describes the decision process to be used by BPA and area utilities. Chapter 5.0 describes opportunities for public participation in decisions to be made about the future reliability of Puget Sound's electricity supply.

  9. Impacts of Western Area Power Administration's power marketing alternatives on electric utility systems

    International Nuclear Information System (INIS)

    Veselka, T.D.; Portante, E.C.; Koritarov, V.

    1995-03-01

    This technical memorandum estimates the effects of alternative contractual commitments that may be initiated by the Western Area Power Administration's Salt Lake City Area Office. It also studies hydropower operational restrictions at the Salt Lake City Area Integrated Projects in combination with these alternatives. Power marketing and hydropower operational effects are estimated in support of Western's Electric Power Marketing Environmental Impact Statement (EIS). Electricity production and capacity expansion for utility systems that will be directly affected by alternatives specified in the EIS are simulated. Cost estimates are presented by utility type and for various activities such as capacity expansion, generation, long-term firm purchases and sales, fixed operation and maintenance expenses, and spot market activities. Operational changes at hydropower facilities are also investigated

  10. Separation of powers of local administrations and other public authorities, local governments in the sphere of land relations

    Directory of Open Access Journals (Sweden)

    А. С. Самородов

    2015-05-01

    Full Text Available Problem Setting. The article studies the issue of demarcation of powers of local administrations and other public authorities, local governments in the sphere of land relations. Emphasized the special legal status of local state administrations is to combine the powers of the authority of general and special jurisdiction. Paper objective. Local administration is a local executive body and is part of the executive power. The local administration within their authority exercises executive power in the territory of the administrative-territorial unit, as well as implementing powers delegated to it by the respective council. Paper main body. Powers of special competence in particular, carry out structural subdivisions of local state administrations, the jurisdiction of which include question of sectoral or functional management in the relevant territory (eg, health administration, financial management, etc.. Conclusions. Analyzing the above legal provisions, the authority of the local administration can be understood as assigned to it by the State and enshrined in law the obligation to exposure to certain social relations. In other words, the powers of local state administrations are certain activities of the state in the face of local state administration. This is consistent with the understanding of the general theory of law the concept of «state functions» - the basic perspectives that express its nature and social purpose in the management of public affairs.

  11. Salmonid Gamete Preservation in the Snake River Basin, 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, Robyn; Kucera, Paul A. (Nez Perce Tribe, Lapwai, ID)

    1999-03-01

    Steelhead (Oncorhynchus mykiss) and salmon (Oncorhynchus tshawytscha)populations in the Northwest are decreasing. The Nez Perce Tribe (Tribe) was funded in 1998 by the Bonneville Power Administration to coordinate gene banking of male gametes from Endangered Species Act (ESA) listed steelhead and spring and summer chinook salmon in the Snake River basin.

  12. Administrative procedures for regulating construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Cochaud, J.P.

    1981-01-01

    This article first explains that nuclear power plants in France are governed by a complex system of regulations within the framework of different laws concerning, in particular, protection of the environment, public health and workers. It then examines the administrative procedures and the licensing regime for nuclear power plants. (NEA) [fr

  13. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Science.gov (United States)

    2012-05-03

    ..., Portland, Oregon 97208-3621; toll-free telephone 1-800-282-3713; direct telephone 360- 619-6178; or email... citizens, special interest groups, local and federal governments, and any other interested parties are...

  14. New Whole-House Solutions Case Study: Performance and Costs of Ductless Heat Pumps in Marine Climate High-Performance Homes

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-02-24

    The Woods is a sustainable community built by Habitat for Humanity in 2013. This community comprises 30 homes that are high-performance and energy-efficient. With support from Tacoma Public Utilities and the Bonneville Power Administration, the BA-PIRC team is researching the energy performance of these homes and the ductless heat pumps they employ.

  15. Western Area Power Administration combined power system financial statements September 30, 1994 and 1993 and management overview and performance measurements

    Energy Technology Data Exchange (ETDEWEB)

    Marwick, P.

    1994-12-31

    The attached report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1994. The auditors have expressed an unqualified opinion on Western`s 1994 statements. Their reports on Western`s internal control structure and on compliance with laws and regulations are also provided. Western was established in December 1977, and has the responsibility for the Federal electric power marketing and transmission functions in 15 central and western states. Western markets power, as required by existing law, at the lowest possible rates consistent with sound business principles to recover the costs of operation and capital invested in power facilities.

  16. Design requirements document for the phase 1 privatization electrical power system

    Energy Technology Data Exchange (ETDEWEB)

    Singh, G.

    1997-10-31

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract.

  17. Design requirements document for the phase 1 privatization electrical power system

    International Nuclear Information System (INIS)

    Singh, G.

    1997-01-01

    The electrical system for the Phase 1 privatization facilities will support the TWRS mission by providing the electrical power to the Phase 1 privatized facilities. This system will receive power from the Department of Energy-Richland Operations (RL) A4-8 230 kV transmission system powered from Bonneville Power Administration (BPA) Ashe and Midway 230 kV Substations. The existing RL 230 kV transmission line will be modified and looped 1021 into the new 230 kV substation bus. The new substation will be located in the vicinity of the privatized facilities, approximately 3.2 km (2 mi) south of the existing RL A4-8 230 kV transmission line. The substation will be capable of providing up to 40 MW of electrical power to support the Phase 1 privatization facilities and has space for accommodating future expansions. The substation will require at least two 230-13.8 kV transformers, 13.8 kV split bus switchgear, switchgear building, grounding transformers, instrument transformers, control and monitoring equipment, associated protection and isolation devices, lightning protection, yard lighting, cable and raceways, and infrastructure needed to provide desired availability and reliability. The power from the 13.8 kV switchgear located in the switchgear building will be delivered at the privatization facilities site boundaries. The 13.8 kV distribution system inside the privatization facilities site boundaries is the responsibility of the privatization contract

  18. Shillapoo Wildlife Area 2007 Follow-up HEP Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-03-01

    In April and May 2007 the Regional HEP Team (RHT) conducted a follow-up HEP analysis on the Egger (612 acres) and Herzog (210 acres) parcels located at the north end of the Shillapoo Wildlife Area. The Egger and Herzog parcels have been managed with Bonneville Power Administration funds since acquired in 1998 and 2001 respectively. Slightly more than 936 habitat units (936.47) or 1.14 HUs per acre was generated as an outcome of the 2007 follow-up HEP surveys. Results included 1.65 black-capped chickadee HUs, 280.57 great blue heron HUs, 581.45 Canada goose HUs, 40 mallard HUs, and 32.80 mink HUs. Introduction A follow-up Habitat Evaluation Procedures (HEP) (USFWS 1980) analysis was conducted by the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) during April and May 2007 to document changes in habitat quality and to determine the number of habitat units (HUs) to credit Bonneville Power Administration (BPA) for providing operation and maintenance (O&M) funds since WDFW acquired the parcels. The 2007 follow-up HEP evaluation was limited to Shillapoo Wildlife Area (SWA) parcels purchased with Bonneville Power Administration funds. D. Budd (pers. comm.) reported WDFW purchased the 612 acre Egger Farms parcel on November 2, 1998 for $1,737,0001 and the 210 acre Herzog acquisition on June 21, 2001 for $500,000 with Memorandum of Agreement funds (BPA and WDFW 1996) as partial fulfillment of BPA's wildlife mitigation obligation for construction of Bonneville and John Day Dams (Rasmussen and Wright 1989). Anticipating the eventual acquisition of the Egger and Herzog properties, WDFW conducted HEP surveys on these lands in 1994 to determine the potential number of habitat units to be credited to BPA. As a result, HEP surveys and habitat unit calculations were completed as much as seven years prior to acquiring the sites. The term 'Shillapoo Wildlife Area' will be used to describe only the Herzog and Egger parcels in this

  19. Power Lines and Crops Can Be Good Neighbors

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-08-01

    Two of the Pacific Northwest’s greatest economic assets are its wealth of agriculture and its clean and reliable electricity fueled largely by hydropower. Sometimes the two intersect. Transmission lines carrying electricity to the region’s farms, businesses and homes must, of necessity, span large areas where people grow crops and orchards. To ensure a safe and reliable flow of electricity across these expanses, trees and other vegetation must be managed to certain standards. At the same time, the Bonneville Power Administration — which owns and operates three-quarters of the region’s high-voltage transmission — recognizes the importance of our region’s agricultural bounty. We are committed to working with individuals and agricultural communities to facilitate ongoing land-use activities in transmission rights-of-way as long as those uses are compatible with transmission safety and reliability standards. Our goal with vegetation management is to keep you and your property safe while protecting the reliability of our region’s electricity system. By working together, BPA and landowners can protect the system and public safety.

  20. Draft 1992 Resource Program : Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future resource needs -- how much new resource development is needed by BPA, which types of resources to acquire and option, how to go about acquiring them, and how much to spend. The Northwest Power Planning Council completed a new Northwest Power Plan in 1991. This Draft Resource Program describes how BPA proposes to do its part to meet the Council's regional resource objectives.

  1. The power of competition

    International Nuclear Information System (INIS)

    Fuqua, G.L.; Pratt, J.H.; Elliot, J.

    1995-01-01

    The change-over from regulated monopolies to a non-regulated competitive market in the electric utility industry was discussed in terms of marketing and survival strategies for utilities it the newly competitive marketplace. The impact of low natural gas prices was prominently discussed as a danger to hydroelectricity generators because high efficiency turbine generators that are now available. Surplus power capacity in both the Canadian and US markets were discussed. The effects of independent power producers selling electricity wholesale to private utilities was also debated on account of its potential to change the role of the electric utility. The situation of the Bonneville Power Association (BPA), a self-financed government agency, as owner of 15 000 miles of transmission grid that is not allowed to own generation plants, was described. Strategies developed by BPA in an effort to adapt to the competitive market were described and were successful

  2. Southeastern Power Administration 2012 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-01-01

    are committed to providing reliable hydroelectric power to preference customers, which ultimately serve more than 12 million consumers in the southeast. Sincerely, Kenneth E. Legg Administrator

  3. H.R. 2605: Energy and Water Development Appropriations Act, 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    Appropriations are made for the following purposes: (1) Corps of Engineers for general investigations, construction, flood control, operation and maintenance, regulatory program, general expenses, revolving fund, and administrative provision; (2) Dept. of the Interior for the central Utah project, Bureau of Reclamation, water and related resources, Central Valley project restoration fund, California Bay-Delta restoration, and administrative provisions; (3) Dept. of Energy for energy supply, non-defense environmental management, uranium enrichment decontamination and decommissioning fund, science, nuclear waste disposal, and departmental administration; (4) Atomic Energy Defense activities for weapon activities, defense environmental restoration and waste management, defense environmental management privatization, and defense nuclear waste disposal; (5) Power marketing administrations for Bonneville Power Administration fund, operation and maintenance of the Southeastern Power Administration, the Southwestern Power Administration, the Western Area Power Administration, Falcon and Amistad operating and maintenance fund, and salaries and expenses for FERC; (6) Independent agencies including Appalachian Regional Commission, Denali Commission, Defense Nuclear Facilities Safety Board, Nuclear Regulatory Commission, Office of Inspector General, Nuclear Waste Technical Review Board, and the Tennessee Valley Authority fund. Certain appropriations are also rescinded.

  4. Snake River Sockeye salmon habitat and limnological research. Annual report 1995

    International Nuclear Information System (INIS)

    Teuscher, D.; Taki, D.

    1996-05-01

    This report contains studies which are part of the Bonneville Power Administration's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Attention is focused on population monitoring studies in the Sawtooth Valley Lakes. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database

  5. 1991 Pacific Northwest loads and resources study, Pacific Northwest economic and electricity use forecast

    International Nuclear Information System (INIS)

    1992-01-01

    This publication provides detailed documentation of the load forecast scenarios and assumptions used in preparing BPA's 1991 Pacific Northwest Loads and Resources Study (the Study). This is one of two technical appendices to the Study; the other appendix details the utility-specific loads and resources used in the Study. The load forecasts and assumption were developed jointly by Bonneville Power Administration (BPA) and Northwest Power Planning Council (Council) staff. This forecast is also used in the Council's 1991 Northwest Conservation and Electric Power Plan (1991 Plan)

  6. PURPA Resource Development in the Pacific Northwest : Case Studies of Ten Electricity Generating Powerplants.

    Energy Technology Data Exchange (ETDEWEB)

    Washington State Energy Office.

    1990-07-01

    The case studies in this document describe the Public Utilities, Regulatory Policies Act (PURPA) development process for a variety of generating technologies. Developer interactions with regulatory agencies and power purchasers are described in some detail. Equipment, installation, and maintenance costs are identified; power marketing considerations are taken into account; and potential environmental impacts, with corresponding mitigation approaches and practices are summarized. The project development case studies were prepared by the energy agencies of the four Northwest states, under contract to the Bonneville Power Administration.

  7. White sturgeon mitigation and restoration in the Columbia and Snake rivers upstream from Bonneville Dam Report C, Annual Progress Report April 2003 - March 2004

    Science.gov (United States)

    Parsley, Michael J.; Gadomski, Dena M.; Kofoot, Pete

    2005-01-01

    River discharge and water temperatures that occurred during April through July 2003 provided conditions suitable for spawning by white sturgeon downstream from Bonneville, The Dalles, John Day, and McNary dams. Although optimal spawning temperatures in the four tailraces occurred for less than two weeks, they coincided with a period of relatively high river discharge. Bottom-trawl sampling in Bonneville and The Dalles Reservoirs revealed the presence of young-of-the-year (YOY) white sturgeon in Bonneville Reservoir, but none were captured in The Dalles Reservoir. A comparison of five years of indices of abundance of YOY sturgeon from sampling done by ODFW with gillnets and the USGS with bottom trawls was completed. Despite obvious differences in gear sampling characteristics (e.g. one gear is actively fished, one passively fished), it appears that either gear can be used to assess relative trends in YOY white sturgeon abundance. The analyses suffered due to poor catches of YOY fish, as YOY were only captured in The Dalles Reservoir during three of the five years of comparison sampling, and during only one of four years in John Day Reservoir. However, both gears detected the presence or absence of YOY white sturgeon within a reservoir equally. That is, if any YOY white sturgeon were captured in any year in a reservoir, both gears captured at least one fish, and if one gear failed to collect any YOY white sturgeon, both gears failed. Concerns have been raised that the Wang et al. (1985) egg development relationships for Sacramento River white sturgeon may not be applicable to Columbia Basin stocks. However, using laboratory experiments with white sturgeon eggs incubated at 10, 12, 15, and 18o C, we found no significant differences in development rates of eggs of Columbia, Kootenai, Snake, and Sacramento river fish.

  8. Expert systems and microwave communication systems alarms processing: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Tonn, B.; Goeltz, R.; Purucker, S.

    1987-07-01

    This report presents the results of a feasibility study conducted by Oak Ridge National Laboratory (ORNL) for the Bonneville Power Administration concerning the applicability of Artificial Intelligence (AI) technology to process alarms associated with Bonneville's Microwave Communication System (MCS). Specifically, the discussion focuses on the characteristics of a prototype expert system/database management system (DBMS) configuration capable of intelligently processing alarms, efficiently storing alarm-based historical data, and providing analysis and reporting tools. Such a system has the potential to improve response to critical alarms, increase the information content of a large volume of complicated data, free operators from performing routine analysis, and provide alarm information to operators, field personnel, and management through queries and automatically produced reports.

  9. West Foster Creek Expansion Project 2007 HEP Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-02-01

    During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

  10. The Bonneville Power Administration new energy-efficient homes programs: Final environmental impact statement: Volume 1, Assessing indoor air quality options

    International Nuclear Information System (INIS)

    1988-03-01

    BPA has underway marketing and incentive programs to encourage the construction of new energy-efficient homes that comply with Model Conservation Standards (MCS) developed by the Northwest Power Planning Council. These homes are designed to have lower infiltration rates than current building practices provide, which is likely to contribute to increased levels of indoor air pollutants, and may adversely affect the health of occupants. BPA's current and past new homes programs maintained ventilation rates comparable to those found in current practice homes by requiring balanced mechanical ventilation. BPA now proposes to give builders and consumers more flexibility by increasing the options for protecting indoor air quality in its new homes programs. This proposal is the impetus for this Environmental Impact Statement (EIS), which was prepared for BPA by Pacific Northwest Laboratory. BPS is preparing this EIS to assess whether other techniques maintain indoor air quality comparable to that found in homes built using current practices. Although many pollutants are potentially of great concern, our analysis concentrates on radon and formaldehyde. It is based on measured concentrations of these pollutants and measured ventilation rates in current practice. Ventilation was measured using fan pressurization tests, which measure only air leakage, and perfluorocarbon tracer gas (PFT) tests, which account for ventilation from mechanical devices and occupant behavior in addition to air leakage. These tests yielded two different estimates. We used these data to estimate pollutant concentrations and lifetime cancer rates under three alternative actions. Under all of the alternatives, radon had a much greater effect than formaldehyde. 102 refs

  11. A Statistical Approach to Planning Reserved Electric Power for Railway Infrastructure Administration

    OpenAIRE

    Brabec, M. (Marek); Pelikán, E. (Emil); Konár, O. (Ondřej); Kasanický, I. (Ivan); Juruš, P. (Pavel); Sadil, J.; Blažek, P.

    2013-01-01

    One of the requirements on railway infrastructure administration is to provide electricity for day-to-day operation of railways. We propose a statistically based approach for the estimation of maximum 15-minute power within a calendar month for a given region. This quantity serves as a basis of contracts between railway infrastructure administration and electricity distribution system operator. We show that optimization of the prediction is possible, based on underlying loss function deriv...

  12. Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1; FINAL

    International Nuclear Information System (INIS)

    Carlson, Thomas J

    2001-01-01

    This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories

  13. 1991 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 1.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    This publication provides detailed documentation of the load forecast scenarios and assumptions used in preparing BPA's 1991 Pacific Northwest Loads and Resources Study (the Study). This is one of two technical appendices to the Study; the other appendix details the utility-specific loads and resources used in the Study. The load forecasts and assumption were developed jointly by Bonneville Power Administration (BPA) and Northwest Power Planning Council (Council) staff. This forecast is also used in the Council's 1991 Northwest Conservation and Electric Power Plan (1991 Plan).

  14. Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY09 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.

    2009-10-22

    This document is the annual report for fiscal year 2009 (FY09) for the project called Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers [Corps or USACE], U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS).

  15. Issue update: a regional settlement proposal to resolve the Washington Nuclear Plant No. 3 lawsuit

    International Nuclear Information System (INIS)

    1985-08-01

    The Bonneville Power Administration (BPA) announced on August 2, 1985, that a number of substantive changes suggested by public comment on the Washington Nuclear Plant No. 3 settlement had been agreed to in principle by BPA and four private utilities. Since that date the details of these changes have been resolved, and the proposed settlement is now being offered for public review and comment

  16. Development of High-Efficiency Low-Lift Vapor Compression System - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Katipamula, Srinivas; Armstrong, Peter; Wang, Weimin; Fernandez, Nicholas; Cho, Heejin; Goetzler, W.; Burgos, J.; Radhakrishnan, R.; Ahlfeldt, C.

    2010-03-31

    PNNL, with cofunding from the Bonneville Power Administration (BPA) and Building Technologies Program, conducted a research and development activity targeted at addressing the energy efficiency goals targeted in the BPA roadmap. PNNL investigated an integrated heating, ventilation and air conditioning (HVAC) system option referred to as the low-lift cooling system that potentially offers an increase in HVAC energy performance relative to ASHRAE Standard 90.1-2004.

  17. Study to Determine the Biological Feasibility of a New Fish Tagging System, 1998-2000 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Downing, Sandra L.

    2001-05-01

    Since 1984, the National Marine Fisheries Service (NMFS) in cooperation with the Bonneville Power Administration (BPA) has conducted an ongoing research and development project to expand and improve technology for Passive-Integrated-Transponder tags (PIT tags) throughout the Columbia River Basin (CRB). Work conducted as part of this project during 1999-2000 was divided into six individual projects, which are covered separately in this report.

  18. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batten, G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  19. Federal Court of Administration dismissed appeals in nuclear power plant proceedings

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    On July 18, 1980 the Federal Court of Administration handed down several decisions made in proceedings on nuclear power stations. It dismissed the appeal field by the complaining party. 1. In the proceedings concerning the Kruemmel reactor being about to be completed, the World Association for the Protecteion of Life was again denied the right to file a complaint. 2. In the proceedings concerning the nuclear power station under construction at Muelheim-Kaerlich, the objections raised were regarded as being insufficient for repealing the licence. 3. In the proceedings concerning the nuclear power staion at Wyhl which has not been built yet, the objections raised were declared not to be sufficiently substantiated in time. The written opinions of all proceedings are not yet available. (HSCH) [de

  20. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  1. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  2. Increased Levels of Harvest and Habitat Law Enforcement and Public Awareness for Anadromous Salmonids and Resident Fish in the Columbia River Basin -- Demonstration Period, 1992--1994, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    NeSmith, Frank (Idaho Department of Fish and Game, Boise, ID); Long, Mack (Montana Department of Fish, Wildlife and Paks, Kalispell, MT); Matthews, Dayne (Washington Department of Fish and Wildlife, Olympia, WA)

    1995-06-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin.

  3. Increased levels of harvest and habitat law enforcement and public awareness for anadromous salmonids and resident fish in the Columbia River Basin - Demonstration period, 1992-1994. Final report

    International Nuclear Information System (INIS)

    1995-06-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin

  4. Resource Contingency Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  5. Relationship between School Administrators' Organizational Power Sources and Teachers' Organizational Citizenship Behaviors

    Science.gov (United States)

    Altinkurt, Yahya; Yilmaz, Kursad

    2012-01-01

    The main purpose of the research was to determine correlation between school administrators' organizational power sources and teachers' organizational citizenship behaviors in primary schools. The research was a correlational survey model study. 275 participants were randomly chosen for the research. The data were collected by…

  6. Federal Administrative Court, judgement of December 17, 1986 (nuclear power station at international border)

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    In its decision of December 17, 1986, the Federal Administrative Court accepted the right of action of Dutch borderers against an atomic licence for a German nuclear power plant. The necessary involvement according to sec. 42 Paragraph 2 of the Administrative Court Procedure Act results from the violation of the third party protection provision in sec. 7 Atomic Energy Act. (WG) [de

  7. 75 FR 17913 - Maintenance and Vegetation Management Along Existing Western Area Power Administration...

    Science.gov (United States)

    2010-04-08

    ... Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line... Corporation's mandatory vegetation management and maintenance standards (FAC-003-1) in accordance with section... Service) authorizations or issuing new authorizations to accommodate Western's vegetation management...

  8. Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes -- Habitat for Humanity The Woods

    Energy Technology Data Exchange (ETDEWEB)

    Lubliner, Michael [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Howard, Luke [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Hales, David [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Kunkle, Rick [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Gordon, Andy [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Spencer, Melinda [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program

    2016-02-18

    The Woods is a Habitat for Humanity (HFH) community of ENERGY STAR Homes Northwest (ESHNW)-certified homes located in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report, and includes significant billing analysis and cost effectiveness research from a collaborative, ongoing Ductless Heat Pump (DHP)research effort for Tacoma Public Utilities (TPU) and Bonneville Power Administration (BPA). This report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing such as HFH. Tacoma Public Utilities (TPU) and Bonneville Power Administration (BPA). This report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing such as HFH.

  9. Northeast Regional Biomass Program

    Energy Technology Data Exchange (ETDEWEB)

    O' Connell, R.A.

    1991-11-01

    The management structure and program objectives for the Northeast Regional Biomass Program (NRBP) remain unchanged from previous years. Additional funding was provided by the Bonneville Power Administration Regional Biomass Program to continue the publication of articles in the Biologue. The Western Area Power Administration and the Council of Great Lakes Governors funded the project Characterization of Emissions from Burning Woodwaste''. A grant for the ninth year was received from DOE. The Northeast Regional Biomass Steering Committee selected the following four projects for funding for the next fiscal year. (1) Wood Waste Utilization Conference, (2) Performance Evaluation of Wood Systems in Commercial Facilities, (3) Wood Energy Market Utilization Training, (4) Update of the Facility Directory.

  10. Northeast Regional Biomass Program. Final progress report, July--September 1991

    Energy Technology Data Exchange (ETDEWEB)

    O`Connell, R.A.

    1991-11-01

    The management structure and program objectives for the Northeast Regional Biomass Program (NRBP) remain unchanged from previous years. Additional funding was provided by the Bonneville Power Administration Regional Biomass Program to continue the publication of articles in the Biologue. The Western Area Power Administration and the Council of Great Lakes Governors funded the project ``Characterization of Emissions from Burning Woodwaste``. A grant for the ninth year was received from DOE. The Northeast Regional Biomass Steering Committee selected the following four projects for funding for the next fiscal year. (1) Wood Waste Utilization Conference, (2) Performance Evaluation of Wood Systems in Commercial Facilities, (3) Wood Energy Market Utilization Training, (4) Update of the Facility Directory.

  11. Northeast Regional Biomass Program

    International Nuclear Information System (INIS)

    O'Connell, R.A.

    1991-11-01

    The management structure and program objectives for the Northeast Regional Biomass Program (NRBP) remain unchanged from previous years. Additional funding was provided by the Bonneville Power Administration Regional Biomass Program to continue the publication of articles in the Biologue. The Western Area Power Administration and the Council of Great Lakes Governors funded the project ''Characterization of Emissions from Burning Woodwaste''. A grant for the ninth year was received from DOE. The Northeast Regional Biomass Steering Committee selected the following four projects for funding for the next fiscal year. (1) Wood Waste Utilization Conference, (2) Performance Evaluation of Wood Systems in Commercial Facilities, (3) Wood Energy Market Utilization Training, (4) Update of the Facility Directory

  12. Evaluation of Management of Water Releases for Painted Rocks Reservoir, Bitterroot River, Montana, 1983-1986, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Spoon, Ronald L. (Montana Department of Fish, Wildlife and Parks, Missoula, MT)

    1987-06-01

    This study was initiated in July, 1983 to develop a water management plan for the release of water purchased from Painted Rocks Reservoir. Releases were designed to provide optimum benefits to the Bitterroot River fishery. Fisheries, habitat, and stream flow information was gathered to evaluate the effectiveness of these supplemental releases in improving trout populations in the Bitterroot River. The study was part of the Northwest Power Planning Council's Fish and Wildlife Program and was funded by the Bonneville Power Administration. This report presents data collected from 1983 through 1986.

  13. The judgement of simultaneous commutation failure in HVDC about hierarchical connection to AC grid

    Science.gov (United States)

    Li, Ming; Song, Xinli; Huang, Daoshan; Liu, Wenzhuo; Zhao, Shutao; Ye, Xiaohui; Meng, Hang

    2017-09-01

    The hierarchical connection to AC grid at inverter sides in UHVDC has been take in several projects. This paper introduced the frame of the connection mode in hierarchical access system and compared it with the traditional one at the case of HVDC-Cigre. Then the criterion of commutation failure according to the same valves current was deduced. In order to verify the accuracy of the criterion, this paper used PSD-BPA (Bonneville Power Administration) to simulate the setting voltage drop in the East China power grid and certified the correctness of the formula.

  14. 78 FR 9936 - Federal Housing Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program...

    Science.gov (United States)

    2013-02-12

    ... Administration (FHA): PowerSaver Home Energy Retrofit Loan Pilot Program: Extension of Pilot Program AGENCY...: On March 31, 2011, HUD published a notice that announced HUD's FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program) known as FHA PowerSaver, which is a pilot program conducted for loans...

  15. Grande Ronde Basin endemic spring chinook salmon supplementation program

    International Nuclear Information System (INIS)

    1998-02-01

    As part of its responsibilities under the Northwest Power Act (Pacific Northwest Electric Power Planning and Conservation Act of 1980), Bonneville Power Administration (BPA) must mitigate the loss of fish, wildlife, and related spawning grounds and habitat attributable to power production at federal hydroelectric dams on the Columbia River and its tributaries. The federal dams have been identified as a major source of mortality for the listed Snake River salmon stocks. BPA also has responsibilities under the Endangered Species Act (ESA) of 1973 to operate in a way that does not jeopardize the continued existence of listed species and to use its agency resources to conserve listed species

  16. Modeling Episodic Ephemeral Brine Lake Evaporation and Salt Crystallization on the Bonneville Salt Flats, Utah

    Science.gov (United States)

    Liu, T.; Harman, C. J.; Kipnis, E. L.; Bowen, B. B.

    2017-12-01

    Public concern about apparent reductions in the areal extent of the Bonneville Salt Flat (BSF) and perceived changes in inundation frequency has motivated renewed interest in the hydrologic and geochemical behavior of this salt playa. In this study, we develop a numerical modeling framework to simulate the relationship between hydrometeorologic variability, brine evaporation and salt crystallization processes on BSF. The BSF, locates in Utah, is the remnant of paleo-lake Bonneville, and is capped by up to 1 meter of salt deposition over a 100 km2 area. The BSF has two distinct hydrologic periods each year: a winter wet periods with standing surface brine and the summer dry periods when the brine is evaporated, exposing the surface salt crust. We develop a lumped non-linear dynamical models coupling conservation expressions from water, dissolved salt and thermal energy to investigate the seasonal and diurnal behavior of brine during the transition from standing brine to exposed salt at BSF. The lumped dynamic models capture important nonlinear and kinetic effects introduced by the high ionic concentration of the brine, including the pronounced effect of the depressed water activity coefficient on evaporation. The salt crystallization and dissolution rate is modeled as a kinetic process linearly proportional to the degree of supersaturation of brine. The model generates predictions of the brine temperature and the solute and solvent masses controlled by diurnal net radiation input and aerodynamic forcing. Two distinct mechanisms emerge as potential controls on salt production and dissolution: (1) evapo-concentration and (2) changes in solubility related to changes in brine temperature. Although the evaporation of water is responsible for ultimate disappearance of the brine each season ,variation in solubility is found to be the dominant control on diurnal cycles of salt precipitation and dissolution in the BSF case. Most salt is crystallized during nighttime, but the

  17. BPA/Lower Valley transmission project. Final environmental impact statement. Appendix C

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration is investigating the feasibility of constructing an additional transmission line, which for the most part will be adjacent to the existing transmission line. This would require the construction or acquisition of additional access roads, used for routine and emergency maintenance and construction activities. A survey was conducted to map any occurrences of threatened, endangered and sensitivity plant species and weed species along the Swan Valley-Teton Line. This report contains Appendix C

  18. 1985 consumer segmentation: Assessment of the market for conservation in the Northwest: Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, B.M.; Hattrup, M.P.; Nordi, R.T.; Shankle, S.A.; Ivey, D.L.

    1987-05-01

    This report presents information on consumer attitudes toward conservation, past and intended conservation behaviors, and utility-sponsored conservation program participation levels. The information was collected by means of random telephone surveys of households in Idaho, Oregon, Washington, and Western Montana. Pacific Northwest Laboratory (PNL) conducted analyses of the survey results for the Bonneville Power Administration (BPA) to obtain a better understanding of consumer attitudes and behaviors and to facilitate conservation program planning, design, and marketing.

  19. BPA/Lower Valley transmission project. Final environmental impact statement. Appendix F

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration is investigating the feasibility of constructing an additional transmission line, which for the most part will be adjacent to the existing transmission line. This would require the construction or acquisition of additional access roads, used for routine and emergency maintenance and construction activities. A survey was conducted to map any occurrences of threatened, endangered and sensitivity plant species and weed species along the Swan Valley-Teton Line. This report contains Appendix F

  20. Air quality analysis for the Western Area Power Administration's 2004 Power Marketing Plan Environmental Impact Statement

    International Nuclear Information System (INIS)

    Glantz, C.S.; Dagle, J.E.; Bilyard, G.R.

    1997-01-01

    The Western Area Power Administration (Western) markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of firm power (plus 100 MW of seasonal peaking capacity) from the Central Valley Project (CVP) and other resources. Western's mission is to sell and deliver electricity generated from these resources. Western's capacity and energy sales must be in conformance with the laws that govern its sale of electrical power. Further, Western's hydropower operations at each facility must comply with minimum and maximum flows and other constraints set by other regulatory agencies. The Sierra Nevada Region proposes to develop a marketing plan that defines the products and services it would offer beyond the year 2004 and the eligibility and allocation criteria for its electric power resources. Because determining levels of long-term firm power resources to be marketed and subsequently entering into contracts for the delivery of related products and services could be a major Federal action with potentially significant impacts to the human environment, the 2004 Power Marketing Plan Environmental Impact Statement (2004 EIS) is being prepared. Decisions made by the Sierra Nevada Region on how and when to supply power to its customers would influence the operation of power plants within the Western Systems Coordinating Council (WSCC). If the resources affected are thermal resources, this could in turn affect the amount, timing, and location of pollutant emissions to the air at locations throughout the western United States. This report has been produced in conjunction with the 2004 EIS to provide a more detailed discussion of the air quality implications of the 2004 power marketing plan

  1. Environmental Audit of the Alaska Power Administration

    International Nuclear Information System (INIS)

    1992-10-01

    This report documents the results of the Comprehensive Baseline Environmental Audit of the Alaska Power Administration (APA) headquartered in Juneau, Alaska. This Audit was conducted by the US Department of Energy's (DOE's) Office of Environmental Audit (EH-24) from August 24 to December 8, 1992. The scope of the Audit was comprehensive, covering all environmental programs and activities with the exception of those relating to the National Environmental Policy Act (NEPA). Specifically considered was the compliance status of APA regarding Federal, state, and local statutes and regulations, DOE Orders and Directives, and best management practices. The technical disciplines addressed by the Audit were: air, surface water/drinking water, groundwater, waste management, toxic and chemical materials, quality assurance, inactive waste sites, and environmental management. Due to the nature of the activities carried out at the two Federal hydroelectric projects operated by APA, the area of radiation was not investigated during the Audit

  2. 75 FR 60745 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2010-10-01

    ... Federal Power Marketing Agency in the Pacific Northwest. BPA operations are financed from power revenues... financial assistance policy. The BFAI also comprise BPA's rules governing implementation of the principles provided in the following Federal Regulations and/or OMB circulars: 2 CFR Part 220 Cost Principles for...

  3. Monitoring of downstream salmon and steelhead at federal hydroelectric facilities

    International Nuclear Information System (INIS)

    Hawkes, L.A.; Martinson, R.D.; Absolon, R.F.

    1993-05-01

    The seaward migration of salmonid smolts was monitored by the National marine Fisheries Service (NMFS) at two sites on the Columbia River in 1992. The NMFS Smolt Monitoring Project is part of a larger Smolt Monitoring Program to index Columbia Basin juvenile salmonied stocks. It is coordinated by the Fish Passage Center (FPC) for the Columbia Basin Fish and Wildlife Agencies and Tribes. Its purpose is to facilitate fish passage through reservoirs and at dams by providing FPC with timely smolt migration data used for flow and spill management. Data is also used for travel time, migration timing and relative run size magnitude analysis. This program is carried out under the auspices of the Northwest Power Planning Council Fish and Wildlife Program and is funded by the Bonneville Power Administration (BPA). Sampling sites were John Day and Bonneville Dams under the 1992 Smolt Monitoring Program. All pertinent fish capture, condition, brand recovery, and flow data, were reported daily to FPC. These data were incorporated into the FPC's Fish Passage Data System (FPDS)

  4. Glucose administration attenuates spatial memory deficits induced by chronic low-power-density microwave exposure.

    Science.gov (United States)

    Lu, Yonghui; Xu, Shangcheng; He, Mindi; Chen, Chunhai; Zhang, Lei; Liu, Chuan; Chu, Fang; Yu, Zhengping; Zhou, Zhou; Zhong, Min

    2012-07-16

    Extensive evidence indicates that glucose administration attenuates memory deficits in rodents and humans, and cognitive impairment has been associated with reduced glucose metabolism and uptake in certain brain regions including the hippocampus. In the present study, we investigated whether glucose treatment attenuated memory deficits caused by chronic low-power-density microwave (MW) exposure, and the effect of MW exposure on hippocampal glucose uptake. We exposed Wistar rats to 2.45 GHz pulsed MW irradiation at a power density of 1 mW/cm(2) for 3 h/day, for up to 30 days. MW exposure induced spatial learning and memory impairments in rats. Hippocampal glucose uptake was also reduced by MW exposure in the absence or presence of insulin, but the levels of blood glucose and insulin were not affected. However, these spatial memory deficits were reversed by systemic glucose treatment. Our results indicate that glucose administration attenuates the spatial memory deficits induced by chronic low-power-density MW exposure, and reduced hippocampal glucose uptake may be associated with cognitive impairment caused by MW exposure. Copyright © 2012 Elsevier Inc. All rights reserved.

  5. Seven Global Goals. 2013 annual report, Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-09-01

    For over 70 years, Southwestern has marketed and delivered reliable, renewable, and affordable hydropower, partnering with Federal power stakeholders and others in the industry to make sure the lights stay on. This kind of effective, efficient, and cost conscious operation is made possible only by hard work and dedication. Southwestern employees work individually and as a team to meet seven comprehensive agency goals that touch on all aspects of the agency’s operations. Dubbed the “Seven Global Goals” by Administrator Chris Turner, these objectives identify specific, measurable targets that support Southwestern’s mission and reinforce its responsibilities toward its customers and the Nation.

  6. 75 FR 78694 - Proposed Residential Exchange Program Settlement Agreement Proceeding (REP-12); Public Hearing...

    Science.gov (United States)

    2010-12-16

    ..., 2010, on BPA's Web site at http://www.bpa.gov/corporate/ratecase/2012/rep-12.cfm . Hard copies of these.... Bonneville Power Admin., 928 F.2d 905 (9th Cir. 1991). Due to the burdensome, expensive and contentious... Electric v. Bonneville Power Admin., 501 F.3d 1009 (9th Cir. 2007) (PGE), the Court found that BPA had...

  7. BPA efforts to protect salmon and supply energy

    International Nuclear Information System (INIS)

    Geiselman, J.; Schiewe, R.

    1993-01-01

    The Bonneville Power Administration has sought to increase numbers of anadromous fish in the Columbia River for many years. In spite of these efforts, numbers of some species have continued to decline while others increased. As a result, several species of Salmon from the Snake River portion of the Columbia River basin have been listed as threatened or endangered under the Endangered Species Act. This presentation will identify analytical tools used to assess fish mitigation measures and the changes in power production and marketing expected from implementation of the National Marine Fisheries Service Recovery Plan and the Northwest Power Planning Council's Fish and Wildlife Program

  8. Administrative limits for tritium concentrations found in non-potable groundwater at nuclear power facilities

    International Nuclear Information System (INIS)

    Parker, R.; Hart, D.; WIllert, C.

    2012-01-01

    Currently, there is a regulatory limit available for tritium in drinking water, but no such limit for non-potable groundwater. Voluntary administrative limits for site groundwater may be established at nuclear power facilities to ensure minimal risk to human health and the environment, and provide guidance for investigation or other actions intended to prevent exceedances of future regulatory or guideline limits. This work presents a streamlined approach for nuclear power facilities to develop three tiers of administrative limits for tritium in groundwater so that facilities can identify abnormal/uncontrolled releases of tritium at an early stage, and take appropriate actions to investigate, control, and protect groundwater. Tier 1 represents an upper limit of background, Tier 2 represents a level between background and Tier 3, and Tier 3 represents a risk-based concentration protective of down-gradient receptors. (author)

  9. Superconducting magnetic energy storage (SMES) program, January 1-December 31, 1981

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1982-02-01

    Work reported is on the development of a 30 MJ superconducting magnetic energy storage (SMES) unit for use by the Bonneville Power Administration (BPA) to stabilize power oscillations on their Pacific AC Intertie. The 30 MJ superconducting coil manufacture was completed. Design of the seismic mounting of the coil to the nonconducting dewar lid and a concrete foundation is complete. The superconducting application VAR (SAVAR) control study indicated a low economic advantage and the SAVAR program was terminated. An economic and technological evaluation of superconducting fault current limiter (SFCL) was completed and the results are reported

  10. 77 FR 55829 - Western Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)

    Science.gov (United States)

    2012-09-11

    ... DEPARTMENT OF ENERGY Western Area Power Administration; Grapevine Canyon Wind Project Record of... one or more phases, dependent on one or more power sale contracts. The proposed wind park would... that limit construction vehicle speed limits. Foresight indicated that the wind park contractor will...

  11. Northeast Oregon Hatchery Project, Conceptual Design Report, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery (Montgomery Watson, Bellevue, WA)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  12. Northeast Oregon Hatchery Project final siting report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  13. Northeast Oregon Hatchery Project conceptual design report. Final report

    International Nuclear Information System (INIS)

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed

  14. Northeast Oregon Hatchery Project, Final Siting Report.

    Energy Technology Data Exchange (ETDEWEB)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  15. Alaska Power Administration combined financial statements, schedules, and supplemental reports, September 30, 1997 and 1996 with independent auditors` report thereon

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The Alaska Power Administration (APA) will continue to encourage economic and industrial development in Alaska through implementing the sale of APA assets in a manner consistent with the authorizing legislation while balancing all the stakeholders` interests. Alaska Power Administration will provide their employees opportunities for successful career transitions and conduct an efficient transfer of assets and closeout of APA, while continuing to provide customers reliable, low-cost hydroelectric energy during the transition. The attached report presents the results of the independent certified public accounts` audit of the Alaska Power Administration`s (APA) combined power system statements of assets; Federal investment and liabilities; and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` reports on APA`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance. Based on the unqualified opinion of the independent public accounting firm of KPMG Peak Marwick LLP and review of their audit work, the authors believe the financial statements fairly present the financial condition and results of the operations of APA for the period under audit.

  16. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  17. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    International Nuclear Information System (INIS)

    Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2004-01-01

    This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes)

  18. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2004-01-01

    This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

  19. BPA/Lower Valley transmission project. Final environmental impact statement. Appendices A, B, D, E, G-N

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration is investigating the feasibility of constructing an additional transmission line, which for the most part will be adjacent to the existing transmission line. This would require the construction or acquisition of additional access roads, used for routine and emergency maintenance and construction activities. A survey was conducted to map any occurrences of threatened, endangered and sensitivity plant species and weed species along the Swan Valley-Teton Line. This report contains Appendices A, B, D, E, G--N

  20. SAT administrator

    International Nuclear Information System (INIS)

    Havas, A.

    1998-01-01

    SAT Administrator is the Information System for Nuclear Power Plant Personnel Training Program Design. It supports the design of training programs in the following phases: job analysis; task analysis; competency analysis; task competency association; definition of learning objectives to competencies; training program design; definition of test items. The general structure of the database and management software supports application of the SAT Administrator in any nuclear power installation

  1. Potential environmental effects of energy conservation measures in northwest industries

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, M C; Gygi, K F; Hendrickson, P L

    1992-01-01

    The Bonneville Power Administration (Bonneville) has identified 101 plants in the Pacific Northwest that account for 80% of the region's industrial electricity consumption. These plants offer a precise target for a conservation program. PNL determined that most of these 101 plants were represented by 11 major industries. We then reviewed 36 major conservation technologies used in these 11 industrial settings to determine their potential environmental impacts. Energy efficiency technologies designed for industrial use may result in direct or indirect environmental impacts. Effects may result from the production of the conservation measure technology, changes in the working environment due to different energy and material requirements, or changes to waste streams. Industry type, work-place conditions, worker training, and environmental conditions inside and outside the plant are all key variables that may affect environmental outcomes. To address these issues this report has three objectives: Describe potential conservation measures that Bonneville may employ in industrial programs and discuss potential primary impacts. Characterize industrial systems and processes where the measure may be employed and describe general environmental issues associated with each industry type. Review environmental permitting, licensing, and other regulatory actions required for industries and summarize the type of information available from these sources for further analysis.

  2. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  3. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  4. Ecology of Juvenile Salmon in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta, Lower Columbia River, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Sather, Nichole K.; Johnson, Gary E.; Storch, Adam; Teel, David; Skalski, John R.; Jones, Tucker A.; Dawley, Earl M.; Zimmerman, Shon A.; Borde, Amy B.; Mallette, Christine; Farr, R.

    2009-05-29

    The tidal freshwater monitoring (TFM) project reported herein is part of the research, monitoring, and evaluation effort developed by the Action Agencies (Bonneville Power Administration, the U.S. Army Corps of Engineers [USACE], and the U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act (ESA) as a result of operation of the Federal Columbia River Power System. The project is being performed under the auspices of the Northwest Power and Conservation Council’s Columbia Basin Fish and Wildlife Program (Project No. 2005-001-00). The research is a collaborative effort among the Pacific Northwest National Laboratory, the Oregon Department of Fish and Wildlife, the National Marine Fisheries Service, and the University of Washington.

  5. Southwestern Power Administration annual site environmental report CY 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This report provides a synopsis of Southwestern Power Administration's (Southwestern's) effectiveness in managing its operations in an environmentally responsible manner. In CY 1997, the Office of Environmental, Safety, and Health was reorganized and incorporated into the Division of Acquisition and Property. The Division of Acquisition, Property, and Environmental Management maintains responsibility for development, oversight, and implementation of environmental programs. Senior Management at Southwestern has taken actions to increase environmental awareness throughout the organization. During CY 1997, (Southwestern) was not involved in any known programs or activities that had adverse impacts on the environment. The 1997 Environmental Appraisal, a portion of Southwestern's Self-Assessment and Appraisal Program, indicated approximately 90% compliance with Southwestern's written environmental programs. Southwestern continued to function throughout CY 1997 in an operations and maintenance posture with minor substation projects

  6. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1995-04-01

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  7. Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

    2008-03-12

    The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

  8. Nez Perce tribal hatchery project : combined-planning and design and operations and maintenance reports, annual report, 2000

    International Nuclear Information System (INIS)

    Larson, Roy Edward; Walker, Grant

    2002-01-01

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O and M) and Planning and Design (P and D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002

  9. Impacts on irrigated agriculture of changes in electricity costs resulting from Western Area Power Administration's power marketing alternatives

    International Nuclear Information System (INIS)

    Edwards, B.K.; Flaim, S.J.; Howitt, R.E.; Palmer, S.C.

    1995-03-01

    Irrigation is a major factor in the growth of US agricultural productivity, especially in western states, which account for more than 85% of the nation's irrigated acreage. In some of these states, almost all cropland is irrigated, and nearly 50% of the irrigation is done with electrically powered pumps. Therefore, even small increases in the cost of electricity could have a disproportionate impact on irrigated agriculture. This technical memorandum examines the impacts that could result from proposed changes in the power marketing programs of the Western Area Power Administration's Salt Lake City Area Office. The changes could increase the cost of power to all Western customers, including rural municipalities and irrigation districts that rely on inexpensive federal power to pump water. The impacts are assessed by translating changes in Western's wholesale power rate into changes in the cost of pumping water as an input for agricultural production. Farmers can adapt to higher electricity prices in many ways, such as (1) using different pumping fuels, (2) adding workers and increasing management to irrigate more efficiently, and (3) growing more drought-tolerant crops. This study projects several responses, including using less groundwater and planting fewer waterintensive crops. The study finds that when dependence on Western's power is high, the cost of power can have a major effect on energy use, agricultural practices, and the distribution of planted acreage. The biggest percentage changes in farm income would occur (1) in Nevada and Utah (however, all projected changes are less than 2% of the baseline) and (2) under the marketing alternatives that represent the lowest capacity and energy offer considered in Western's Electric Power Marketing Environmental Impact Statement. The aggregate impact on farm incomes and the value of total farm production would be much smaller than that suggested by the changes in water use and planted acreage

  10. The nuclear power station verdicts in the Freiburg administrative court and the Wuerzburg administrative court in March 1977

    International Nuclear Information System (INIS)

    Haeusler, D.

    1977-01-01

    The verdicts which followed in rapid sequence by the Freiburg Administrative Court on the 14th March 1977 in the dispute about the Wyhl nuclear power station, and by the 25th March concerning the dispute about the Grafenrheinfeld nuclear station have attracted special interest because of their controversial judgements on the requirement for a 'burst-protection'. But they also demonstrate in the further decisions and their bases that there are still many legal questions in atom law which have not yet been made absolutely clear. The author attemps to show points of agreement and of antithesis in the verdicts, and adopts an attitude. (orig.) [de

  11. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study; FINAL

    International Nuclear Information System (INIS)

    Cook, Chris B; Richmond, Marshall C; Guensch, Greg

    2001-01-01

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating

  12. The Prediction Power of Servant and Ethical Leadership Behaviours of Administrators on Teachers' Job Satisfaction

    Science.gov (United States)

    Güngör, Semra Kiranli

    2016-01-01

    The purpose of this study is to identify servant leadership and ethical leadership behaviors of administrators and the prediction power of these behaviors on teachers' job satisfaction according to the views of schoolteachers. This research, figured in accordance with the quantitative research processes. The target population of the research has…

  13. 30-MJ SMES system operating experience: November 1982-June 1983

    International Nuclear Information System (INIS)

    Schermer, R.I.

    1983-01-01

    This paper describes performance measurements on the dewar, coil, and cryogenic system for the 30-MJ superconducting magnetic energy storage (SMES) unit that has recently been tested at a Bonneville Power Administration substation in Tacoma, Washington. The cryostat, the world's largest fiber-reinforced plastic, open-mouthed dewar, boils off 12 l/h in accordance with previous calculations. Cyclic losses in the coil, 54 W for +-8.4-MW modulation at 1 Hz, are approximately 50% greater than calculated. Refrigerator capacity is adequate to handle the heat produced by the average modulation demand on the coil

  14. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach of the Columbia River, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John; Nugent, Michael; Brock, Wendy (Washington Department of Fish and Wildlife, Olympia, WA)

    2002-05-29

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the fourth year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 2000 field season.

  15. Wind River Watershed Restoration Project, Segment II, 2000-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bair, Brian; Olegario, Anthony; Powers, Paul

    2002-06-01

    This document represents work conducted as part of the Wind River Watershed Restoration Project during its second year of funding through the Bonneville Power Administration (BPA). The project is a comprehensive effort involving public and private entities seeking to restore water quality and fishery resources in the basin through cooperative actions. Project elements include coordination, watershed assessment, restoration, monitoring, and education. Entities involved with implementing project components are the Underwood Conservation District (UCD), USDA Forest Service (USFS), U.S. Geological Survey - Columbia River Research Lab (USGS-CRRL), and WA Department of Fish & Wildlife (WDFW).

  16. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  17. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach of the Columbia River, 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John

    2002-01-24

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the third year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1999 field season.

  18. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach in the Columbia River, 1998 Interim Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John; Newsome, Todd; Nugent, Michael (Washington Department of Fish and Wildlife, Olympia, WA)

    2001-07-27

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the second year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fish species, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1998 field season.

  19. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  20. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  1. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  2. Ecology of Juvenile Salmonids in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta, Lower Columbia River, 2007

    Energy Technology Data Exchange (ETDEWEB)

    Sobocinski, Kathryn L.; Johnson, Gary E.; Sather, Nichole K.; Storch, Adam; Jones, Tucker A.; Mallette, Christine; Dawley, Earl M.; Skalski, John R.; Teel, David; Moran, Paul

    2008-03-18

    This document is the first annual report for the study titled “Ecology of Juvenile Salmonids in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta in the Lower Columbia River.” Hereafter, we refer to this research as the Tidal Freshwater Monitoring (TFM) Study. The study is part of the research, monitoring, and evaluation effort developed by the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The project is performed under the auspices of the Northwest Power and Conservation Council’s Columbia Basin Fish and Wildlife Program.

  3. Resource programs: Draft Environmental Impact Statement Resource Programs

    International Nuclear Information System (INIS)

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program's Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS

  4. Antelope--Fossil rebuild project

    International Nuclear Information System (INIS)

    1992-04-01

    The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project

  5. 78 FR 57372 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2013-09-18

    ... established in 1937 as a Federal Power Marketing Agency in the Pacific Northwest. BPA operations are financed... implementation of the principles provided in the following Federal Regulations and/or OMB circulars: 2 CFR Part 220 Cost Principles for Educational Institutions (Circular A-21); 2 CFR Part 225 Cost Principles for...

  6. 76 FR 63290 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2011-10-12

    ... established in 1937 as a Federal Power Marketing Agency in the Pacific Northwest. BPA operations are financed... implementation of the principles provided in the following Federal Regulations and/or OMB circulars: 2 CFR part 220 Cost Principles for Educational Institutions (CircularA-21); 2 CFR part 225 Cost Principles for...

  7. 77 FR 58984 - Availability of the Bonneville Purchasing Instructions (BPI) and Bonneville Financial Assistance...

    Science.gov (United States)

    2012-09-25

    ... established in 1937 as a Federal Power Marketing Agency in the Pacific Northwest. BPA operations are financed... implementation of the principles provided in the following Federal Regulations and/or OMB circulars: 2 CFR Part 220 Cost Principles for Educational Institutions (CircularA-21); 2 CFR Part 225 Cost Principles for...

  8. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  9. Research and Development Report, Fiscial Year 1989-1990.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-08-01

    Since the 1940s, the Bonneville Power Administrative (BPA), has sought to advance an efficient system to provide the Pacific Northwest region with safe, reliable, and cost-effective electrical power. Research and development (R D) activities support that mission. Each biennium, R D managers issue a digest report of the various programs and activities in each of the technological arenas. The report covers a few projects, considered as yielding particularly significant results, as spotlights. Others are described less fully; in some cases with a simple annotation. The report's divisions correspond to the major categories of R D projects: fish and wildlife, energy resources, and transmission technology. 18 figs., 4 tabs.

  10. Environmental Management Audit: Southwestern Power Administration (Southwestern)

    International Nuclear Information System (INIS)

    1993-03-01

    This report documents the results of the Environmental Management Audit completed for the Southwestern Power Administration. During this Audit, activities and records were reviewed and personnel interviewed. The onsite portion of the Southwestern Audit was conducted from November 30 through December 11, 1992, by the US Department of Energy's Office of Environmental Audit (EH-24). EH-24 carries out independent assessments of Department of Energy (DOE) facilities and activities as part of the Assistant Secretary's Environmental Audit Program. This program is designed to evaluate the status of DOE facilities/activities regarding compliance with laws, regulations, DOE Orders, formal written procedures, compliance agreements, and Best Management Practices (BMPs). This internal oversight function plays an important role in improving the compliance status of DOE operations. The Environmental Management Audit stresses DOE's policy that it is the responsibility of line management to conduct operations in an environmentally sound and safe manner. The Environmental Management Audit focuses on management systems and programs, whereas the Environmental Baseline Audit conducted in March 1991 focused on specific compliance issues. The scope of the Southwestern Environmental Management Audit included a review of all systems and functions necessary for effective environmental management. Specific areas of review included: Organizational Structure; Environmental Commitment; Environmental Protection Programs; Formality of Environmental Programs; Internal and External Communication; Staff Resources, Training, and Development; and Program Evaluation, Reporting, and Corrective Action

  11. Southwestern Power Administration Combined Financial Statements, 2006-2009

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-09-01

    We have audited the accompanying combined balance sheets of the Southwestern Federal Power System (SWFPS), as of September 30, 2009, 2008, 2007, and 2006, and the related combined statements of revenues and expenses, changes in capitalization, and cash flows for the years then ended. As described in note 1(a), the combined financial statement presentation includes the hydroelectric generation functions of another Federal agency (hereinafter referred to as the generating agency), for which Southwestern Power Administration (Southwestern) markets and transmits power. These combined financial statements are the responsibility of the management of Southwestern and the generating agency. Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the combined financial statements are free of material misstatement. An audit includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of Southwestern and the generating agency’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the combined financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall combined financial statement presentation. We believe that our audits provide a reasonable basis for our opinion. In our opinion, the combined financial statements referred to above present fairly, in all material respects, the respective financial position of the Southwestern Federal Power

  12. Administrative competence of regions in connection with the establishment of power plants

    International Nuclear Information System (INIS)

    Poidomani, C.

    1980-03-01

    This paper which is divided into two parts, analyses the concept of competence underlying the regulations concerning the transfer of certain state duties to the regions. The author considers that this concept does not seem adaptable to the various functions the regions are required to discharge in the energy field. A description follows of the technical and administrative authority given to the regions in the licensing process for power-producing plants. The second part of the paper deals with recent regulations concerning energy conservation and development of alternative energy sources, in the context of regional competence. (NEA) [fr

  13. Obrigheim nuclear power plant. Federal Administrative Court, judgement of June 7, 1991. BVerWG 7 C 43.90

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    With its judgement the Federal Administrative Court has reversed the decision of the Administrative Court of Justice (VGH) Baden-Wuerttemberg from May 1990. Legally incorrect the VGH has assumed that the nuclear power station Obrigheim was in operation without necessary license as the second operating license was limited to a test run and the time past was to long for a test run. In the opinion of the Federal Administrative Court by giving a license for the test run without determinating a limit in time permanent operation is not definitively permitted, but it is permitted until the office takes a decision about the end of the test run. (orig.) [de

  14. Marion Industrial Substation project

    International Nuclear Information System (INIS)

    1992-04-01

    Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines

  15. Conceptions of Power among Senior Women Administrators at Liberal Arts Colleges in the Upper Midwestern United States

    Science.gov (United States)

    Enke, Kathryn

    2014-01-01

    Women are underrepresented in senior-level leadership positions in higher education institutions, and their experiences are underrepresented in research about leadership and power in higher education. This qualitative study engaged women senior administrators at liberal arts colleges in the Upper Midwestern United States to better understand how…

  16. 14 CFR 302.17 - Administrative law judges.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Administrative law judges. 302.17 Section... Evidentiary Hearing Proceedings § 302.17 Administrative law judges. (a) Powers and delegation of authority. (1) An administrative law judge shall have the following powers, in addition to any others specified in...

  17. A new emergency control for voltage stability utilizing the time overvoltage capability of large shunt capacitor banks

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Carson W; Vanleuven, Allen L; Nordstrom, Jerry M [Bonneville Power Administration, Portland, OR (United States)

    1994-12-31

    Electric utilities have become increasing concerned with the possibility of voltage instability and voltage collapse. Although many countermeasures are a possible, control based countermeasures are often the most cost effective. Voltage collapse is often only a threat during unusual conditions such as very high load and major outages. For these low probability conditions, low cost emergency controls may be the only cost effective countermeasures. This paper provides details on a prototype installation by the Bonneville Power Administration of a new low cost emergency control for voltage stability named CAPS (CAPacitor bank series group Shorting). (author) 6 refs., 5 figs.

  18. Annual coded wire tag program, Washington: Missing production groups. Annual report for 1998

    International Nuclear Information System (INIS)

    Byrne, J.; Fuss, H.

    1999-01-01

    The Bonneville Power Administration (BPA) funds the ''Annual Coded Wire Tag Program--Missing Production Groups for Columbia River Hatcheries'' project. The WDFW project has three main objectives: (1) coded-wire tag at least one production group of each species at each Columbia Basin hatchery to enable evaluation of survival and catch distribution over time, (2) recover coded-wire tags from the snouts of fish tagged under objective 1 and estimate survival, contribution, and stray rates for each group, and (3) report the findings under objective 2 for all broods of chinook, and coho released from WDFW Columbia Basin hatcheries

  19. 75 FR 78730 - Federal Housing Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit Loan Pilot...

    Science.gov (United States)

    2010-12-16

    ... Administration (FHA): Notice of FHA PowerSaver Home Energy Retrofit Loan Pilot Program: Extension of Period... proposal to conduct an FHA Home Energy Retrofit Loan Pilot Program (Retrofit Pilot Program or Pilot Program... Efficient Mortgage Innovation pilot program targeted to the single family housing market, and the Retrofit...

  20. Federal supervisory powers in administrative action on behalf of the Federal Government. Bundesaufsicht in der Bundesauftragsverwaltung

    Energy Technology Data Exchange (ETDEWEB)

    Tschentscher, T

    1992-01-01

    The Federal Government's authority to give instructions in matters of public administration pursuant to Art. 85 III GG has been gaining in significance over the last few years in the course of federal disputes about the licenses issued to the NUKEM company under atomic energy law, or about the licensing of the Kalkar fast breeder reactor. Proceeding from the above federal controversy about issues relating to atomic energy law, the author extends his study to the general constitutional level, investigating the provisions of the German constitution relating to the supervisory power and the authority to give instructions on the part of the Federal Government, and the rights and means of the Laender governments to defend their administrative rights. (orig.).

  1. Outline of safety regulations and administrations for commercial nuclear power plants in Japan

    International Nuclear Information System (INIS)

    Kinichi Yamamoto

    1987-01-01

    Outline of safety regulations and administrations for the commercial nuclear power plants in Japan is briefly described. The strict measures for safety assurance are always taken based on the principle of defense-indepth. In the actual procedures of regulatory control, the examinations and inspections shall be performed at each individual step in the stage of applications, and also in the stage of constructions. Thus, those regulatory examinations and inspections shall be performed in detail and carefully, and at the most suitable time; resulting in an effective regulatory control by the Ministry of International Trade and Industry. (author)

  2. Alaska Power Administration combined financial statements, schedules and supplemental reports, September 30, 1996 and 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Alaska Power Administration`s (Alaska) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 combined statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Alaska`s internal control structure disclosed no reportable conditions that could have a material effect on the financial statements. The auditors also considered the overview and performance measure data for completeness and material consistency with the basic financial statements, as noted in the internal control report. The auditor`s report on compliance with laws and regulations disclosed no instances of noncompliance by Alaska.

  3. South Oregon Coast Reinforcement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1998-05-01

    The Bonneville Power Administration is proposing to build a transmission line to reinforce electrical service to the southern coast of Oregon. This FYI outlines the proposal, tells how one can learn more, and how one can share ideas and opinions. The project will reinforce Oregon`s south coast area and provide the necessary transmission for Nucor Corporation to build a new steel mill in the Coos Bay/North Bend area. The proposed plant, which would use mostly recycled scrap metal, would produce rolled steel products. The plant would require a large amount of electrical power to run the furnace used in its steel-making process. In addition to the potential steel mill, electrical loads in the south Oregon coast area are expected to continue to grow.

  4. Natural Propagation and Habitat Improvement Idaho: Lolo Creek and Upper Lochsa, Clearwater National Forest.

    Energy Technology Data Exchange (ETDEWEB)

    Espinosa, F.A. Jr.; Lee, Kristine M.

    1991-01-01

    In 1983, the Clearwater National Forest and the Bonneville Power Administration (BPA) entered into a contractual agreement to improve anadromous fish habitat in selected tributaries of the Clearwater River Basin. This agreement was drawn under the auspices of the Northwest Power Act of 1980 and the Columbia River basin Fish and Wildlife Program (section 700). The Program was completed in 1990 and this document constitutes the Final Report'' that details all project activities, costs, accomplishments, and responses. The overall goal of the Program was to enhance spawning, rearing, and riparian habitats of Lolo Creek and major tributaries of the Lochsa River so that their production systems could reach full capability and help speed the recovery of salmon and steelhead within the basin.

  5. Assessment of Smolt Condition for Travel Time Analysis Project, 1987-1997 Project Review.

    Energy Technology Data Exchange (ETDEWEB)

    Schrock, Robin M.; Hans, Karen M.; Beeman, John W. [US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA

    1997-12-01

    The assessment of Smolt Condition for Travel Time Analysis Project (Bonneville Power Administration Project 87-401) monitored attributes of salmonid smolt physiology in the Columbia and Snake River basins from 1987 to 1997, under the Northwest Power Planning Council Fish and Wildlife Program, in cooperation with the Smolt Monitoring Program of the Fish Passage Center. The primary goal of the project was to investigate the physiological development of juvenile salmonids related to migration rates. The assumption was made that the level of smolt development, interacting with environmental factos such as flow, would be reflected in travel times. The Fish Passage Center applied the physiological measurements of smolt condition to Water Budget management, to regulate flows so as to decrease travel time and increase survival.

  6. Natural propagation and habitat improvement Idaho: Lolo Creek and Upper Lochsa, Clearwater National Forest

    International Nuclear Information System (INIS)

    Espinosa, F.A. Jr.; Lee, K.M.

    1991-01-01

    In 1983, the Clearwater National Forest and the Bonneville Power Administration (BPA) entered into a contractual agreement to improve anadromous fish habitat in selected tributaries of the Clearwater River Basin. This agreement was drawn under the auspices of the Northwest Power Act of 1980 and the Columbia River basin Fish and Wildlife Program (section 700). The Program was completed in 1990 and this document constitutes the ''Final Report'' that details all project activities, costs, accomplishments, and responses. The overall goal of the Program was to enhance spawning, rearing, and riparian habitats of Lolo Creek and major tributaries of the Lochsa River so that their production systems could reach full capability and help speed the recovery of salmon and steelhead within the basin

  7. Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

    1993-11-01

    Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

  8. The Federal Administrative Court confirms unlawfulness of nuclear power moratorium. Political primacy is only valid in the bounds of justice

    International Nuclear Information System (INIS)

    Leidinger, Tobias

    2014-01-01

    With its decision on December 20 th , the Federal Administrative Court (BVwerfG) came to the legally valid conclusion that after the Fukushima nuclear power plant accident, the supervision court order related to the law on nuclear installation by the Hessian Ministry for the Environment, in order to stop operating nuclear power plants Biblis A and B for 3 months or rather not to put in operation again, was unlawful (BVwerfG 7 B 18.13 und 7 B 19.13). Beforehand, the Hessian Administrative Court (Hess. VGH) had already pronounced its judgement on February 27 th 2013. The supervising orders were part of the so-called nuclear power moratorium. They were issued after the resolution of the federal government, at demand of the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) towards their nearby countries, and were identically executed by the supervisory authority of the other site-countries. Besides Biblis in Hesse, nuclear power plants in Neckarwestheim I and Philippsburg 1, Baden-Wurttemberg, Isar 1 in Bavaria, Unterweser in Lower Saxony, as well as Brunsbuettel in Schleswig-Holstein, were affected. However only RWE took legal action and was now affirmed - after the Hessian VGH verdict- by the highest German administrative court: The nuclear power moratorium - the first step to withdrawal of nuclear power in Germany - was unlawful. The decision taken by the BVerwG - as well as the one by the Hessian VGH - indicates a juridical clear and precise argumentation. The partially polemic and unobjective critic, which the VHG-verdict experienced, did not disguise, just as little as the political conflict concerning the withdrawal from nuclear energy, the view of federal judges, regarding the decision-relevant questions nor did they influence their reply. The political primacy finds its limits in the bounds of justice. Existing rights do not become thus a paper waste because there is a fundamental decision. This takes effectiveness for

  9. Study plan for evaluating carrying capacity: Measure 7.1A of the Northwest Power Planning Council's 1994 Fish and Wildlife Program. Report 2 of 4, Final report

    International Nuclear Information System (INIS)

    Neitzel, D.A.; Johnson, G.E.

    1996-05-01

    This report is one report of four that the Pacific Northwest National Laboratory (PNNL) staff used to address Measure 7.1A in the Northwest Power Planning Council's (Council) fish and Wildlife Program (Program) dated December 1994 (NPPC 1994). Measure 7.1A calls for the Bonneville Power Administration (BPA) to fund an evaluation of salmon survival, ecology, carrying capacity, and limiting factors in freshwater, estuarine, and marine habitats. Additionally, the Measure asks for the development of a study plan based on the critical uncertainties and research needs identified during the evaluation. In the evaluation of carrying capacity the authors concluded that defining capacity and listing the determinants of capacity is not a simple exercise. Capacity is a complex variable among the attributes that all together define salmon performance. To pursue the capacity parameter, that is, a single number or set of numbers that quantify how many salmon the basin or any part of the basin can support, will not lead to the development of a useful study plan. To increase understanding of ecology, carrying capacity, and limiting factors, it is necessary to deal with the complexity of the sustained performance of salmon in the Columbia River Basin. This report describes the elements of a study plan that could be used to increase the understanding of ecology, carrying capacity, and limiting factors that influence salmon survival under current conditions

  10. Agony in the Northwest

    International Nuclear Information System (INIS)

    Labella, J.W.

    1982-01-01

    A public power crisis in the Pacific Northwest arose over plans to build five nuclear power plants. This review traces the decisions made by the 23 members of the Washington Public Power Supply System (WPPSS), the Bonneville Power Administration, and 115 other utilities and industrial users, rural cooperatives, and investor-owned utilities during the planning and construction stages to the decision to terminate three plants. The effects of political action committees working for referenda to stop bond issues, suits by rate payers and cooperatives, and other financial problems led to the decision to mothball two units and halt construction of a third, which led to the loss of 6000 construction jobs. Work continues at one site at record levels. The region must submit a cost-effective conservation and renewable resource plan next year that will help to clarify the future of nuclear plants in the affected states

  11. Advances in the implementation of a generic long term model for the hydro industry

    International Nuclear Information System (INIS)

    Welt, F.

    2004-01-01

    This presentation describes the Vista Long Term (LT) simulation and decision tool developed for the hydropower and water resource industries by Synexus Global. Vista maximizes the value of hydro resources while addressing environmental concerns. It improves water resource management for all uses over the long term. The tool has been used and adapted to many systems around the world, including Bonneville Power Administration, Reliant Energy, PacifiCorp and Great Lakes Power in the United States and Nova Scotia Power, Yukon Energy, and Newfoundland Hydro in Canada. Vista also helps to plan alternative operating policies and system upgrades by maximizing the expected value of generation and transactions. The tool provides reservoir releases, generation, flows, levels and transactions. Hydroelectric generating facilities that use the Vista tool have improved clean energy production as well as increased revenues resulting from reservoir and plant optimization. tabs., figs

  12. Southeastern Power Administration 2011 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-12-31

    Dear Secretary Chu: I am pleased to submit Southeastern Power Administration’s (Southeastern) fiscal year (FY) 2011 Annual Report for your review. This report reflects our agency’s programs, accomplishments, operational, and financial activities for the 12-month period beginning October 1, 2010, and ending September 31, 2011. This past year, Southeastern marketed approximately 6.2 billion kilowatt-hours of energy to 489 wholesale customers in 10 southeastern states. Revenues from the sale of this power totaled more than $264 million. With the financial assistance and support of Southeastern’s customers, funding for capitalized equipment purchases and replacements at hydroelectric facilities operated by the U.S. Army Corps of Engineers (Corps) continued in FY 2011. This funding, which totaled more than $45 million, provided much needed repairs and maintenance for aging projects in Southeastern’s marketing area. Currently, there are more than 214 customers participating in the funding efforts in the Georgia-Alabama-South Carolina, Kerr-Philpott, and Cumberland Systems of projects. Drought conditions continued in the southeastern region of the United States this past year, particularly in the Savannah River Basin. Lack of rain placed strains on our natural and financial resources. Power purchases for FY 2011 totaled approximately $38 million. About $9 million of this amount was for replacement power, which is purchased only during adverse water conditions in order to meet Southeastern’s customer contract requirements. Southeastern’s goal is to maximize the benefits of our region’s water resources. Competing uses of these resources will present another challenging year for Southeastern’s employees. With the cooperation and communication among the Department of Energy (DOE), preference customers, and Corps, I am certain Southeastern is positioned to meet these challenges in the future. We are committed to providing reliable hydroelectric power to

  13. Commercial equipment loads: End-Use Load and Consumer Assessment Program (ELCAP)

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, R.G.; Williamson, M.A.; Richman, E.E.; Miller, N.E.

    1990-07-01

    The Office of Energy Resources of the Bonneville Power Administration is generally responsible for the agency's power and conservation resource planning. As associated responsibility which supports a variety of office functions is the analysis of historical trends in and determinants of energy consumption. The Office of Energy Resources' End-Use Research Section operates a comprehensive data collection program to provide pertinent information to support demand-side planning, load forecasting, and demand-side program development and delivery. Part of this on-going program is known as the End-Use Load and Consumer Assessment Program (ELCAP), an effort designed to collect electricity usage data through direct monitoring of end-use loads in buildings. This program is conducted for Bonneville by the Pacific Northwest Laboratory. This report provides detailed information on electricity consumption of miscellaneous equipment from the commercial portion of ELCAP. Miscellaneous equipment includes all commercial end-uses except heating, ventilating, air conditioning, and central lighting systems. Some examples of end-uses covered in this report are office equipment, computers, task lighting, refrigeration, and food preparation. Electricity consumption estimates, in kilowatt-hours per square food per year, are provided for each end-use by building type. The following types of buildings are covered: office, retail, restaurant, grocery, warehouse, school, university, and hotel/motel. 6 refs., 35 figs., 12 tabs.

  14. Administrators' Power Usage Styles and Their Impact on the Organizational Culture in Colleges of Education: A Case Study

    Science.gov (United States)

    Ozcan, Kenan; Karatas, Ibrahim Hakan; Caglar, Çaglar; Polat, Murat

    2014-01-01

    The main purpose of this study is to determine how power usage styles of administrators of faculties of education influence the organizational culture in their respective faculties in Turkey. Using the phenomenological method, a qualitative research method, researchers studied a group comprised of 20 academics from 7 different colleges of…

  15. Flathead River creel report, 1992--1993. Final report

    International Nuclear Information System (INIS)

    Hanzel, D.

    1995-09-01

    A roving creel survey was conducted on the Flathead River system, May 1992 through May 1993, as part of Hungry Horse Dam Fisheries Mitigation, funded by Bonneville Power Administration. The Flathead River system is a tributary to the Clarks Fork of the Columbia River originating in northwest Montana and southern British Columbia. The river creel survey was conducted in conjunction with a Flathead Lake creel survey. This document summarizes the creel survey on the river system. The purpose of these creel surveys was to quantify fishery status prior to mitigation efforts and provide replicative survey methodology to measure success of future mitigation activities. 4 figs., 21 tabs

  16. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations, and guilds.

  17. Umatilla River subbasin fish habitat improvement project. Annual report 1993

    International Nuclear Information System (INIS)

    Bailey, T.D.; Laws, T.S.

    1994-05-01

    This annual report is in fulfillment of contract obligations with Bonneville Power Administration which is the funding source for the Oregon Department of Fish and Wildlife's Umatilla Basin Habitat Improvement Project. Major activities undertaken during this report period included: (1) procurement of one access easement with a private landowner, (2) design, layout, and implementation of 3.36 miles of instream structure maintenance, (3) inspection and routine maintenance of 15.1 miles of fence, (4) revegetation along 3.36 miles of stream, (5) collection and summarization of physical and biological monitoring data, (6) extensive interagency coordination, and (7) environmental education activities with local high school students

  18. Hydrologic connections between environmental and societal change at the Bonneville Salt Flats, Utah

    Science.gov (United States)

    Bowen, B. B.; Harman, C. J.; Kipnis, E. L.; Liu, T.; Bernau, J. A.; Horel, J.

    2017-12-01

    The Bonneville Salt Flats (BSF) is an ephemeral and valued salt pan in northwestern Utah where a century of land speed racing and potash mining have created a complex and intertwined social and hydrologic system. The character of BSF changes on daily, weekly, monthly, annual, and geologic time scales in response to fluctuations in water balance, solute flux, and groundwater flow which is impacted by both local meteorology and water management associated with potash mining. In addition, the texture of the salt surface is changed by land use including racing activities, which impacts water fluxes through the crust. Ongoing research is focused on characterizing physical changes in the BSF environment and attributing observed changes in the landscape to specific processes and drivers. Five years of field observations and sampling, analyses of satellite imagery dating back the 1980s, and geochemical analysis of surface brines have shown that spatiotemporal changes in surface water and fluctuations in the surface salt footprint are linked to both climate and land use. Climate data over the last 30 years are examined to identify annual patterns in surface water balance at BSF to identify annual and seasonal climate constraints on flooding, evaporation, and desiccation cycles. A new weather station installed in the Fall of 2016 in the middle of BSF allows for unprecedented analyses of halite surface dynamics. Spatiotemporally dispersed stable isotope analyses of BSF surface brine samples constrain brine sources and evolution. An understanding of the processes that change the surface composition and texture through time inform interpretation of subsurface saline deposits at BSF. The wide range of temporal and spatial scales of observation help to guide to best management practices of this iconic natural resource.

  19. MANAGING THE LOAD SCHEDULE OF THE ADMINISTRATIVE BUILDING TAKING INTO ACCOUNT EMERGING RISKS WHEN CONNECTING THE KINETIC ENERGY STORAGE TO THE POWER SUPPLY SYSTEM

    Directory of Open Access Journals (Sweden)

    S. Yu. Shevchenko

    2017-12-01

    Full Text Available Purpose. The purpose of the paper is to analyze load schedules of the administrative building and develop a structural scheme for connecting the kinetic energy storage in the power supply system of this building, which will allow using it as a consumer regulator, as well as a theoretical study of the risks that arise. Methodology. To conduct the research, the theory of designing internal electrical networks of buildings, the theory of plotting electric load graphs, methods of the theory of electromechanical systems and for analyzing the risk system, the T. Saati method of hierarchies were used. Results. The structure of kinetic energy storage (KES connection to the power supply system of the administrative building is developed and the structural diagram of the KES proposed for installation is given, the average daily winter and summer load schedules are presented, a set of groups and subgroups of risks and their influence on the work of the power supply system of the building are connected with the connection of the KES. Originality. For the first time, the application of the kinetic energy storage in the power supply system of the building with the analysis of emerging risks is considered, which makes it possible to improve the reliability of the developed system and the efficiency of load regulation. Practical value. The application of the proposed scheme will make it possible to use administrative buildings as load regulators of the external power supply system, and also effectively manage the load in the internal power supply system of the building.

  20. 20th Anniversary Conference on World Bank Administrative Tribunal

    CERN Document Server

    2000-01-01

    Contents :"Review of discretionary power by international administrative tribunals" by Michel Gentot, "Checks exerted by administrative tribunals over the discretionary powers of international organizations" by Nicolas Valticos, "Comments" by Ranjan (C.F.) Amerasinghe, "The review of managerial discretion by international administrative tribunals" by Francisco Orrego Vicuña, "Some practical issue arising in international administrative tribunals" by Nassib G. Ziadé, "Aspects of judicial review of administrative action in the WBAT with comparative remarks" by Spyridon Flogaitis, "The International Monetary Fund Administrative Tribunal : its first six years" by Celia Goldman

  1. WPPSS, now in technical default, moves to mothball nuclear unit 3 amidst opposition

    International Nuclear Information System (INIS)

    Utroska, D.

    1983-01-01

    Involved in a number of lawsuits and court challenges, the Washington Public Power Supply System (WPPSS) executive board voted in late May to suspend construction on nuclear unit 3 (underwritten by Bonneville Power Administration) unless additional funding were obtained. (Unit 1 previously was mothballed, and units 4 and 5 are canceled.) WPPSS also failed to pay its $15.6 million May bill to the bond trustee of units 4 and 5. With this monthly amount, the trustee aggregates funds to pay investor's interest of $93.6 million twice a year. Some of the 88 public power participants oppose paying the bond interest of $93.6 million twice a year. Some of the 88 public power participants oppose paying the bond interest and have gone to court. The trustee has been restrained from declaring WPPSS in default. The future of the units will be affected by the Washington Supreme Court decision on the contracts between public utility participants and WPPSS

  2. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  3. Fish Passage Center 2001 annual report.; ANNUAL

    International Nuclear Information System (INIS)

    Fish Passage Center

    2002-01-01

    Extremely poor water conditions within the Columbia River Basin along with extraordinary power market conditions created an exceptionally poor migration year for juvenile salmon and steelhead. Monthly 2001 precipitation at the Columbia above Grand Coulee, the Snake River above Ice Harbor, and the Columbia River above The Dalles was approximately 70% of average. As a result the 2001 January-July runoff volume at The Dalles was the second lowest in Columbia River recorded history. As a compounding factor to the near record low flows in 2001, California energy deregulation and the resulting volatile power market created a financial crisis for the Bonneville Power Administration (BPA). Power emergencies were first declared in the summer and winter of 2000 for brief periods of time. In February of 2001, and on April 3, the BPA declared a ''power emergency'' and suspended many of the Endangered Species Act (ESA) and Biological Opinion (Opinion) measures that addressed mainstem Columbia and Snake Rivers juvenile fish passage. The river and reservoir system was operated primarily for power generation. Power generation requirements in January through March coincidentally provided emergence and rearing flows for the Ives-Pierce Islands spawning area below Bonneville Dam. In particular, flow and spill measures to protect juvenile downstream migrant salmon and steelhead were nearly totally suspended. Spring and summer flows were below the Opinion migration target at all sites. Maximum smolt transportation was implemented instead of the Opinion in-river juvenile passage measures. On May 16, the BPA Administrator decided to implement a limited spill for fish passage at Bonneville and The Dalles dams. On May 25, a limited spill program was added at McNary and John Day dams. Spill extended to July 15. Juvenile migrants, which passed McNary Dam after May 21, experienced a noticeable, improved survival, as a benefit of spill at John Day Dam. The suspension of Biological Opinion

  4. Windows PowerShell 20 Bible

    CERN Document Server

    Lee, Thomas; Schill, Mark E; Tanasovski, Tome

    2011-01-01

    Here's the complete guide to Windows PowerShell 2.0 for administrators and developers Windows PowerShell is Microsoft's next-generation scripting and automation language. This comprehensive volume provides the background that IT administrators and developers need in order to start using PowerShell automation in exciting new ways. It explains what PowerShell is, how to use the language, and specific ways to apply PowerShell in various technologies. Windows PowerShell is Microsoft's standard automation tool and something that every Windows administrator will eventually have to understand; this b

  5. Analysis and Development of a Project Evaluation Process.

    Energy Technology Data Exchange (ETDEWEB)

    Coutant, Charles C.; Cada Glenn F.

    1985-01-01

    The Bonneville Power Administration has responsibility, assigned by the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (Public Law 96-501; 16 USC 839), for implementing the Columbia River Basin Fish and Wildlife Program of the Northwest Power Planning Council. One aspect of this responsibility is evaluation of project proposals and ongoing and completed projects. This report recommends formalized procedures for conducting this work in an accurate, professional, and widely respected manner. Recommendations and justifications are based largely on interviews with federal and state agencies and Indian tribes in the Northwest and nationally. Organizations were selected that have evaluation systems of their own, interact with the Fish and Wildlife Program, or have similar objectives or obligations. Perspective on aspects to be considered were obtained from the social science of evaluation planning. Examples of procedures and quantitative criteria are proposed. 1 figure, 2 tables.

  6. 49 CFR 386.54 - Administrative Law Judge.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Administrative Law Judge. 386.54 Section 386.54... General Rules and Hearings § 386.54 Administrative Law Judge. (a) Powers of an Administrative Law Judge. The Administrative Law Judge may take any action and may prescribe all necessary rules and regulations...

  7. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  8. Hood River Production Program Review, Final Report 1991-2001.

    Energy Technology Data Exchange (ETDEWEB)

    Underwood, Keith; Chapman, Colin; Ackerman, Nicklaus

    2003-12-01

    This document provides a comprehensive review of Bonneville Power Administration (BPA) funded activities within the Hood River Basin from 1991 to 2001. These activities, known as the Hood River Production Program (HRPP), are intended to mitigate for fish losses related to operation of federal dams in the Columbia River Basin, and to contribute to recovery of endangered and/or threatened salmon and steelhead, as directed by Nation Oceanic and Atmospheric Administration - Fisheries (NOAA Fisheries). The Environmental Impact Statement (EIS) for the HRPP, which authorized BPA to fund salmon and steelhead enhancement activities in the Hood River Basin, was completed in 1996 (BPA 1996). The EIS specified seven years of monitoring and evaluation (1996-2002) after program implementation to determine if program actions needed modification to meet program objectives. The EIS also called for a program review after 2002, that review is reported here.

  9. 77 FR 67813 - Sam Rayburn Dam Project Power Rate

    Science.gov (United States)

    2012-11-14

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Sam Rayburn Dam Project Power Rate AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of Rate Order Approving an Extension of Power Rate on an.... James K. McDonald, Assistant Administrator, Southwestern Power Administration, Department of Energy...

  10. 78 FR 47695 - Sam Rayburn Dam Power Rate

    Science.gov (United States)

    2013-08-06

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Sam Rayburn Dam Power Rate AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of public review and comment. SUMMARY: The current Sam..., Southwestern Power Administration (Southwestern), has prepared Current and Revised 2013 Power Repayment Studies...

  11. Tests of the 30-MJ superconducting magnetic-energy storage unit

    International Nuclear Information System (INIS)

    Boenig, H.J.; Dean, J.W.; Rogers, J.D.; Schermer, R.I.; Hauer, J.F.

    1983-01-01

    A 30-MJ (8.4 kWh) superconducting magnetic energy storage (SMES) unit with a 10-MW converter was installed during the later months of 1982 at the Bonneville Power Administration (BPA) Tacoma substation in Tacoma, Washington. The unit, which is capable of absorbing and releasing up to 10 MJ of energy at a frequency of 0.35 Hz, was designed to damp the dominant power swing mode of the Pacific AC Intertie. Extensive tests were performed with the unit during the first half of 1983. This paper will review the major components of the storage unit and describe the startup and steady state operating experience with the coil, dewar, refrigerator and converter. The unit has absorbed power up to a level of 11.8 Mw. Real power was modulated following a sinusoidal power demand with frequencies from 0.1 to 1.2 Hz and a power level up to +- 8.3 MW. The unit has performed in accordance with design expectations and no major problems have developed

  12. Comparisons of self-ratings on managerial competencies, research capability, time management, executive power, workload and work stress among nurse administrators.

    Science.gov (United States)

    Kang, Chun-Mei; Chiu, Hsiao-Ting; Hu, Yi-Chun; Chen, Hsiao-Lien; Lee, Pi-Hsia; Chang, Wen-Yin

    2012-10-01

    To assess the level of and the differences in managerial competencies, research capability, time management, executive power, workload and work-stress ratings among nurse administrators (NAs), and to determine the best predictors of managerial competencies for NAs. Although NAs require multifaceted managerial competencies, research related to NAs' managerial competencies is limited. A cross-sectional survey was conducted with 330 NAs from 16 acute care hospitals. Managerial competencies were determined through a self-developed questionnaire. Data were collected in 2011. All NAs gave themselves the highest rating on integrity and the lowest on both financial/budgeting and business acumen. All scores for managerial competencies, research capability, time management and executive power showed a statistically significant correlation. The stepwise regression analysis revealed that age; having received NA training; having completed a nursing project independently; and scores for research capability, executive power and workload could explain 63.2% of the total variance in managerial competencies. The present study provides recommendations for future administrative training programmes to increase NAs' managerial competency in fulfilling their management roles and functions. The findings inform leaders of hospitals where NAs need to develop additional competencies concerning the type of training NAs need to function proficiently. © 2012 Blackwell Publishing Ltd.

  13. Waivering as Governance: Federalism during the Obama Administration

    Science.gov (United States)

    Saultz, Andrew; McEachin, Andrew; Fusarelli, Lance D.

    2016-01-01

    This article analyzes how the Obama administration used executive power to grant waivers from federal education policies and assesses whether they used this power differently than previous administrations and in other sectors (e.g., health or welfare). The executive use of waivers to shape state policy is not a new trend. However, we find that…

  14. Hot Springs-Garrison Fiber Optic Project

    International Nuclear Information System (INIS)

    1994-10-01

    Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA's substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA

  15. Hot Springs-Garrison Fiber Optic Project

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Bonneville Power Administration (BPA) is proposing to upgrade its operational telecommunications system between the Hot Springs Substation and the Garrison Substation using a fiber optic system. The project would primarily involve installing 190 kilometers (120 miles) of fiber optic cable on existing transmission structures and installing new fiber optic equipment in BPA`s substation yards and control houses. BPA prepared an environmental assessment (EA) evaluating the proposed action. This EA was published in October 1994. The EA identifies a number of minor impacts that might occur as a result of the proposed action, as well as some recommended mitigation measures. This Mitigation Action Plan (MAP) identifies specific measures to avoid, minimize, or compensate for impacts identified in the EA.

  16. StreamNet: FY 1999 annual progress report

    International Nuclear Information System (INIS)

    Columbia River Inter-Tribal Fish Commission

    2000-01-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The views of this report are the author's and do not necessarily represent the views of BPA. This annual report covers progress made by: Columbia River Inter-Tribal Fish Commission Idaho; Department of Fish and Game; Montana Department of Fish, Wildlife and Parks; Oregon Department of Fish and Wildlife; Pacific States Marine Fisheries Commission; Shoshone-Bannock Tribes; US Fish and Wildlife Service; Washington Department of Fish and Wildlife; and FY1999 StreamNet Quickplan

  17. Habitat Evaluation Procedures Report; Graves Property - Yakama Nation.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul; Muse, Anthony

    2008-02-01

    A habitat evaluation procedures (HEP) analysis was conducted on the Graves property (140 acres) in June 2007 to determine the number of habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the property as partial mitigation for habitat losses associated with construction of McNary Dam. HEP surveys also documented the general ecological condition of the property. The Graves property was significantly damaged from past/present livestock grazing practices. Baseline HEP surveys generated 284.28 habitat units (HUs) or 2.03 HUs per acre. Of these, 275.50 HUs were associated with the shrubsteppe/grassland cover type while 8.78 HUs were tied to the riparian shrub cover type.

  18. Annual Review of BPA-Funded Projects in Natural and Artificial Propagation of Salmonids, March 27-29, 1985, Holiday Inn Airport, Portland, Oregon.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1985-04-01

    The Fish and Wildlife Division of Bonneville Power Administration (BPA) hosted a meeting for contractors to present the results of fiscal year 1984 research conducted to implement the Northwest Power Planning Council's Fish and Wildlife Program. The meeting focused on those projects specifically related to natural and artificial propagation of salmonids. The presentations were held at the Holiday Inn Airport in Portland, Oregon, on March 27-29, 1985. This document contains abstracts of the presentations from that meeting. Section 1 contains abstracts on artificial propagation, fish health, and downstream migration, and Section 2 contains abstracts on natural propagation and habitat improvement. The abstracts are indexed by BPA Project Number and by Fish and Wildlife Program Measure. The registered attendees at the meeting are listed alphabetically in Appendix A and by affiliation in Appendix B.

  19. Assessment of Energy Storage Alternatives in the Puget Sound Energy System

    Energy Technology Data Exchange (ETDEWEB)

    Balducci, Patrick J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jin, Chunlian [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wu, Di [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leslie, Patrick [Puget Sound Energy, Bellevue, WA (United States); Daitch, Charles [Puget Sound Energy, Bellevue, WA (United States); Marshall, A. [Primus Power, Hayward, CA (United States)

    2013-12-01

    As part of an ongoing study co-funded by the Bonneville Power Administration, under its Technology Innovation Grant Program, and the U.S. Department of Energy, the Pacific Northwest National Laboratory (PNNL) has developed an approach and modeling tool for assessing the net benefits of using energy storage located close to the customer in the distribution grid to manage demand. PNNL in collaboration with PSE and Primus Power has evaluated the net benefits of placing a zinc bromide battery system at two locations in the PSE system (Baker River / Rockport and Bainbridge Island). Energy storage can provide a number of benefits to the utility through the increased flexibility it provides to the grid system. Applications evaluated in the assessment include capacity value, balancing services, arbitrage, distribution deferral and outage mitigation. This report outlines the methodology developed for this study and Phase I results.

  20. Nuclear power plant safety, their a social acceptance and the part played by the Administration in Spain

    International Nuclear Information System (INIS)

    Alonso Santos, A.

    1980-01-01

    The safety of nuclear power plants is introduced as the complement of risk, which is futhermore explained as the proximity of damage, therefore as frequency of accidents times damage. The reduced risk and, as a consequence, the high standards of safety of nuclear power plants are explained with reference to the American Reactor Safety Study and the German Risikostudie; the situation in less industrial countries is also analyzed. The social rejection of nuclear energy is studied with reference to the concept of risk and explanations are given of the present situation. Within this context, and making reference to Spain, the part played by the Administration is safeguarding the health and safety of the public is discussed. Specific reference is made to the newly published law regulating Nuclear Safety. (author)

  1. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers

  2. Western Area Power Administration combined power system financial statements, September 30, 1996 and 1995 (with independent auditors` report thereon)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This report presents the results of the independent certified public accountants` audit of the Department of Energy`s Western Area Power Administration`s (Western) combined financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statements. The auditors` report on Western`s internal control structure disclosed two new reportable conditions and discussed the status of an unresolved condition from prior years. The new conditions involved the write-off of aging accounts receivable and the understatement of interest expense for inactive construction work orders. These reportable conditions are not considered to be material weaknesses. Western concurred with the audit recommendations and is responsible for necessary corrective actions. The auditors also considered the overview and performance measure data for completeness and material consistency with the basic financial statements as noted in the internal control report. The report also disclosed an additional reportable condition directed to the Bureau of Reclamation (Reclamation) which is not considered to be a material weakness. Reclamation concurred with the audit recommendation and is responsible for necessary corrective action. The auditors` report on Western`s compliance with laws and regulations disclosed two new instances of noncompliance involving interest charges on all construction costs funded with Federal appropriations and other capitalized costs. The report also discussed the status of one instance of noncompliance from prior years. Western provided concurrence and corrective action plans for all of these instances of noncompliance.

  3. CONSTITUTIONALIZATION OF ADMINISTRATIVE LAW AND REVIEWABILITY OF THE ADMINISTRATIVE DISCRETION

    Directory of Open Access Journals (Sweden)

    Luiz Henrique Urquhart Cademartori

    2016-07-01

    Full Text Available The aim of this article is to conduct an analysis of the constitutionalization of Administrative Law, which results from changes in the rule of law and, under a theoretical standpoint, from the paradigm shift of legal exegesis followed by the advent of neo-constitutionalism, which poses the Constitution as the parameter for the interpretation of the other legal branches. Within this context, considering that the concept of administrative discretion goes through interpretation changes and that administrative activity is performed within the boundaries of discretion, this power/duty must always be used with substantial regulatory criteria in order to get the maximum effectiveness of the constitutional rules, thus being subjected to review. In this sense, it is demonstrated that a public official cannot in any way deviate from the realization of the fundamental rights guaranteed by the Constitution, hence stating the reviewability of the administrative discretion.

  4. Administrative decentralization in electric power sector

    International Nuclear Information System (INIS)

    1998-01-01

    In this report are discussed: the new technologies impact in the electric power sector and possible scenarios and greenhouse gases containment in post-Kyoto target, the possible sinergies at urban-territorial scale, the balance of energy environmental policies, simplifications of procedures in authorization and control activities [it

  5. Superconducting magnetic energy storage (SMES) program. Progress report, January 1-December 31, 1980

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1981-03-01

    Work is reported on the development of two superconducting magnetic energy storage (SMES) units. One is a 30-MJ unit for use by the Bonneville Power Administration (BPA) to stabilize power oscillations on their Pacific AC Intertie, and the second is a 1- to 10-GWh unit for use as a diurnal load leveling device. Emphasis has been on the stabilizing system. The manufacturing phase of the 30-MJ superconducting coil was initiated and the coil fabrication has advanced rapidly. The two converter power transformers were manufactured, successfully factory tested, and shipped. One transformer reached the Tacoma Substation in good condition; the other was dropped enroute and has been returned to the factory for rebuilding. Insulation of the 30-MJ coil has been examined for high voltage effects apt to be caused by transients such as inductive voltage spikes from the protective dump circuit. The stabilizing system converter and protective energy dump system were completed, factory tested, and delivered

  6. The 1986 action plan

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Discussion covers the actions that must be taken and the standards to be met to achieve the goals of the 20 year plan. Bonneville Power Administration (BPA) has agreed to develop detailed work plans for achieving the objects of the plan, through a public process in consultation with the Council and interested parties. BPA work plans and activities are outlined. The Council's plan emphasizes the following priorities: (1) a stronger regional role for BPA; (2) development of the capability to acquire conservation on a regional basis; (3) strategies to make better use of the hydropower system; (4) building conservation capability in all sectors; (5) demonstrating the cost effectiveness of renewable resources so they are available before the region has to build new generating resources; (6) allocation of costs for two unfinished nuclear power plants and elimination of barriers to their completion; and (7) a study of electric power sales and purchases between regions

  7. Special report: the Reagan administration, Congress, and nuclear power

    International Nuclear Information System (INIS)

    Nichols, T.A.; Bink, B.H.

    1982-01-01

    One year ago, the Reagan administration set out to invigorate the light-water-reactor industry; to reactivate the breeder-reactor program; to encourage private reprocessing; and to expedite waste management. The authors feel that, to this end, Congress and the administration are on the brink of major regulatory reforms, a sweeping nuclear-waste-disposal program, and tightening guidelines for burial of low-level waste, all of which are vital to the industry's continued health. This report covers the status of their efforts

  8. Administration of radioisotope production

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-01-15

    Current developments in atomic energy, and the administrative problems to which they give rise, were surveyed in a seminar on 'Atomic Energy for Atomic Energy Administrators' held at IAEA headquarters from 30 September to 4 October 1963. The ground covered included protection against radiation, isotopes and radiation sources, research reactors, nuclear power, legal matters, technical and scientific administration, the role of the universities, and the Agency's part in assistance to developing countries. The possibilities and limitations of radioisotope production from research reactors were discussed by Dr. G. B. Cook, of the Division of Research and Laboratories, IAEA in this paper.

  9. Administration of radioisotope production

    International Nuclear Information System (INIS)

    1964-01-01

    Current developments in atomic energy, and the administrative problems to which they give rise, were surveyed in a seminar on 'Atomic Energy for Atomic Energy Administrators' held at IAEA headquarters from 30 September to 4 October 1963. The ground covered included protection against radiation, isotopes and radiation sources, research reactors, nuclear power, legal matters, technical and scientific administration, the role of the universities, and the Agency's part in assistance to developing countries. The possibilities and limitations of radioisotope production from research reactors were discussed by Dr. G. B. Cook, of the Division of Research and Laboratories, IAEA in this paper.

  10. Court Administrators and the Judiciary — Partners in the Delivery of Justice

    Directory of Open Access Journals (Sweden)

    Wayne Stewart Martin

    2014-12-01

    Full Text Available This article examines several topics relating to the administration and governance of courts in democratic societies.  It includes a summary of the development of court administration as a profession, highlighting Australia and the United States.  The summary includes a discussion of how judges and court administrators must work together and coordinate their efforts in key areas of court administration and management.  The article also reviews separation of powers issues, highlighting the problems that emerge in systems in which oversight and administration of the courts is vested in the executive branch or power of government, most commonly in a justice ministry.  It reviews the practical advantages of having courts governed and managed through institutional mechanisms within the judicial power rather than the executive power.

  11. The Principles of Proportionality, Legal Argumentation and the Discretionary Power of the Public Administration: An Analysis from the Limits on Fundamental Rights and Guarantees

    Directory of Open Access Journals (Sweden)

    Yezid Carrillo-de la Rosa

    2017-06-01

    Full Text Available This paper examines the implications of the principle of proportionality with regards to administrative decisions that limit civil liberties and fundamental rights. The hypothesis we intend to demonstrate is that a discretionary power of the Public Administration for issuing measures that restricts individual rights and liberties is just apparent, since the reach of agency discretion for choosing time, means and place conditions is very narrow. As the following research shows, the principle of proportionality obliges administrative agencies to implement effective means to attain the purposes of their intervention, but minimizing its impacts on constitutionally protected rights and liberties.

  12. Considerations about an administrative ''margin of prognosis''

    International Nuclear Information System (INIS)

    Tettinger, P.J.

    1982-01-01

    The investigation is concerned with the limitations of certain judicial concepts, and the descretion of the appropriate administrative authorities to interpret them, especially in the area of necessary precautionary measures with regard to nuclear power plants safety. Thereby the question arises, whether by interpreting undefined judicial concepts (such as ''the status of science and technology'', e.g. section 1 sub-section 2, number 3 of the Atomic Energy Law), administrative authorities should be given a flexible margin of judgement which could not be examined, by the administrative courts, especially in view of risk analysis and risk assessments. Diverging opinions in legal literature and the administration of justice will be presented and critically analyzed. The author argues for an integral administrative procedure. Controlling the licensing of nuclear power plants, which - if need be - should only be limited by a ''plausibility control'' in cases where several security-safety related technical solutions appear acceptable. (WBI) [de

  13. Reducing the cost of administrative justice

    International Nuclear Information System (INIS)

    Tourtellotte, J.R.

    1982-01-01

    In virtually every sector of government regulation, the complaint has been lodged that the costs of administrative justice are too high. These costs in time, money, resources, and productivity can have a profound effect on the individual consumer. When applied to an energy technology such as nuclear power, costs of administrative justice can transcent time and money to have even more profound and pervasive soeietal effects. Societal costs can be expressed in terms of their impact on important national concerns, that is, the standard of living, technological superiority, and the national energy equation. Some views are presented on the interests involved in the regulation of nuclear power and what can be done to bring those interests into better balance so as to reduce the cost of administrative justice

  14. Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    van der Naald, Wayne; Duff, Cameron; Friesen, Thomas A. (Oregon Department of Fish and Wildlife, Clackamas, OR)

    2006-02-01

    Pacific salmon Oncorhynchus spp. populations have declined over the last century due to a variety of human impacts. Chum salmon O. keta populations in the Columbia River have remained severely depressed for the past several decades, while upriver bright (URB) fall Chinook salmon O. tschawytscha populations have maintained relatively healthy levels. For the past seven years we have collected data on adult spawning and juvenile emergence and outmigration of URB fall Chinook and chum salmon populations in the Ives and Pierce islands complex below Bonneville Dam. In 2004, we estimated 1,733 fall Chinook salmon and 336 chum salmon spawned in our study area. Fall Chinook salmon spawning peaked 19 November with 337 redds and chum salmon spawning peaked 3 December with 148 redds. Biological characteristics continue to suggest chum salmon in our study area are similar to nearby stocks in Hardy and Hamilton creeks, and Chinook salmon we observe are similar to upriver bright stocks. Temperature data indicated that 2004 brood URB fall Chinook salmon emergence began on 6 January and ended 27 May 2005, with peak emergence occurring 12 March. Chum salmon emergence began 4 February and continued through 2 May 2005, with peak emergence occurring on 21 March. Between 13 January and 28 June, we sampled 28,984 juvenile Chinook salmon and 1,909 juvenile chum salmon. We also released 32,642 fin-marked and coded-wire tagged juvenile fall Chinook salmon to assess survival. The peak catch of juvenile fall Chinook salmon occurred on 18 April. Our results suggested that the majority of fall Chinook salmon outmigrate during late May and early June, at 70-80 mm fork length (FL). The peak catch of juvenile chum salmon occurred 25 March. Juvenile chum salmon appeared to outmigrate at 40-55 mm FL. Outmigration of chum salmon peaked in March but extended into April and May.

  15. Open Access Transmission Tariff: Effective December 18, 1998 (Revised June 16, 1999).

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1999-06-16

    Bonneville will provide Network Integration Transmission Service pursuant to the terms and conditions contained in this Tariff and Service Agreement. The service that Bonneville will provide under this Tariff allows a Transmission Customer to integrate, economically dispatch and regulate its current and planned Network Resources to serve its Network Load. Network Integration Transmission Service also may be used by the Transmission Customer to deliver nonfirm energy purchases to its Network Load without additional charge. To the extent that the transmission path for moving power from a Network Resource to a Network Load includes the Eastern and Southern Interties, the terms and conditions for service over such intertie facilities are provided under Part 2 of this Tariff. Also, transmission service for third-party sales which are not designated as Network Load will be provided under Bonneville's Point-to-Point Transmission Service (Part 2 of this Tariff).

  16. The Dynamics of Reforming the Public Administration System in Ukraine: Monitoring and Analysis of Implementation of the Reform of Decentralization of Power

    Directory of Open Access Journals (Sweden)

    Yaroshenko Igor V.

    2017-11-01

    Full Text Available The European integration choice of Ukraine, enshrined in the Association Agreement between Ukraine and the European Union, has defined the strategic direction of the country’s development for the near future. One of the main directions of the country modernization is the reform of administrative-territorial, political, public administration systems and establishment of the democratic institution of public power – the local self-government. Formation of foundations and principles of reforming the local self-government and territorial organization of power in Ukraine in accordance with the basic provisions of the European Charter of local self-government is an integral part of the national legislation in this sphere. Carrying out monitoring and analysis of the implementation of the reform of decentralization in Ukraine, as well as assessment of the level of its implementation and efficiency of functioning, identification of problematic issues and risks of implementation of the decentralization reform are very important for timely provision of recommendations for the appropriate solutions.

  17. Canby Area Service Project substation and associated transmission line

    International Nuclear Information System (INIS)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ''environmental impact statement'' is not required

  18. Female and Male Psychologists in Academic Administration: Resource Control and Perceived Influence

    Science.gov (United States)

    Schenk, Jennifer

    2010-01-01

    This study examined male and female psychologists in academic administrative positions with regard to their perceptions of their own power and their actual power within the administrative hierarchies in which they work. In the past, researchers have compared women and men in academic administrative positions with regard to parity of numbers,…

  19. Application of programmable controllers to oil fired boiler light-off system

    International Nuclear Information System (INIS)

    Copeland, H.C.; Gallaway, E.N.

    1978-01-01

    A programmable controller has been used to improve the reliability of an oil-fired boiler burner control system. An outdated and failing Germanium discrete transistor logic control system was replaced with a modern solid state large scale integrated circuit programmable controller. The ease of making this conversion at a modest expenditure during a limited boiler outage is explained, as well as pitfalls and problems encountered. Light-off reliability with fuel savings were prime objectives. The boiler, rated at 575,000 lb/hr at 450 psig, is used as a backup steam supply for the dual purpose N Reactor at Hanford, Washington, which supplies 860 MWe to the Bonneville Power Administration and weapons grade Plutonium for the Department of Energy. High reliability in light-off and load ascension from standby is required of the boiler which serves as the backup power supply for the reactor

  20. Superconducting magnetic energy storage (SMES) program. January 1--December 31, 1978

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1979-02-01

    Work is reported on the development of two superconducting magnetic energy storage units. One is a 30-MJ unit for use by the Bonneville Power Administration to stabilize power oscillations on their Pacific AC Intertie, and the second is a 1- to 10-GWh unit for use as a diurnal load-leveling device. Emphasis has been placed on the stabilizing system. The engineering specification design of the 30-MJ superconducting coil was completed and a contract will be placed for the coil fabrication design. Bids have been received for the stabilizing system 10-MW converter and coil protective dump resistor. These components will be purchased in 1979. The reference design for the 1- to 10-GWh diurnal load-leveling unit has been totally revised and is being assembled in redrafted report form. Plans are to build a 10- to 30-MWh prototype diurnal load-leveling demonstration unit

  1. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  2. StreamNet; 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River Inter-Tribal Fish Commission

    2000-01-01

    This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The views of this report are the author's and do not necessarily represent the views of BPA. This annual report covers progress made by: Columbia River Inter-Tribal Fish Commission Idaho; Department of Fish and Game; Montana Department of Fish, Wildlife and Parks; Oregon Department of Fish and Wildlife; Pacific States Marine Fisheries Commission; Shoshone-Bannock Tribes; US Fish and Wildlife Service; Washington Department of Fish and Wildlife; and FY1999 StreamNet Quickplan.

  3. Mid-Columbia Coho Reintroduction Feasibility Project. Final Environmental Assessment and Finding of No Significant Impact

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact

  4. CTUIR Grande Ronde River Watershed Restoration Program McCoy Creek/McIntyre Creek Road Crossing, 1995-1999 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2000-08-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Bonneville Power Administration (BPA) entered into a contract agreement beginning in 1996 to fund watershed restoration and enhancement actions and contribute to recovery of fish and wildlife resources and water quality in the Grande Ronde River Basin. The CTUIR's habitat program is closely coordinated with the Grande Ronde Model Watershed Program and multiple agencies and organizations within the basin. The CTUIR has focused during the past 4 years in the upper portions of the Grande Ronde Subbasin (upstream of LaGrande, Oregon) on several major project areas in the Meadow, McCoy, and McIntyre Creek watersheds and along the mainstem Grande Ronde River. This Annual Report provides an overview of individual projects and accomplishments.

  5. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  6. Tucannon River Spring Chinook Captive Broodstock Program Final Environmental Assessment and Finding of No Significant Impact

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-05-24

    Bonneville Power Administration (BPA) is proposing to fund the Tucannon River Spring Chinook Captive Broodstock Program, a small-scale production initiative designed to increase numbers of a weak but potentially recoverable population of spring chinook salmon in the Tucannon River in the State of Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-l326) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  7. Grays River Watershed Geomorphic Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Geist, David R

    2005-04-30

    This investigation, completed for the Pacific Northwest National Laboratory (PNNL), is part of the Grays River Watershed and Biological Assessment commissioned by Bonneville Power Administration under project number 2003-013-00 to assess impacts on salmon habitat in the upper Grays River watershed and present recommendations for habitat improvement. This report presents the findings of the geomorphic assessment and is intended to support the overall PNNL project by evaluating the following: The effects of historical and current land use practices on erosion and sedimentation within the channel network The ways in which these effects have influenced the sediment budget of the upper watershed The resulting responses in the main stem Grays River upstream of State Highway 4 The past and future implications for salmon habitat.

  8. A good working comfort in the power plant. Activation of the surface of concrete in the administration building; Gutes Arbeitsklima im Kraftwerk. Betonoberflaechenaktivierung im Verwaltungsgebaeude

    Energy Technology Data Exchange (ETDEWEB)

    Hetzel, Michaela [Uponor GmbH, Hassfurt (Germany)

    2010-07-01

    The target of the establishment of a new administration building was the transformation of a noticeable improvement of the job conditions for 45 co-workers of the power station in the Upper Bavarian Zolling. With an unusual and innovative architecture with an optimized daylight concept and sophisticated facility management, the new building at the east border of the existing power station in Zolling developed.

  9. BPA/Lower Valley transmission project. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-06-01

    Bonneville Power Administration and Lower Valley Power and Light, Inc. propose to solve a voltage stability problem in the Jackson and Afton, Wyoming areas. Lower Valley buys electricity from BPA and then supplies it to the residences and businesses of the Jackson and Afton, Wyoming areas. BPA is considering five alternatives. For the Agency Proposed Action, BPA and Lower Valley would construct a new 115-kV line from BPA's Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA's Teton Substation near Jackson in Teton County, Wyoming. The new line would be next to an existing 115-kV line. The Single-Circuit Line Alternative has all the components of the Agency Proposed Action except that the entire line would be supported by single-circuit wood pole H-frame structures. the Short Line Alternative has all the components of the Single-Circuit Line Alternative except it would only be half as long. BPA would also construct a new switching station near the existing right-of-way, west or north of Targhee Tap. Targhee Tap would then be removed. For the Static Var Compensation Alternative, BPA would install a Static Var Compensator (SVC) at Teton or Jackson Substation. An SVC is a group of electrical equipment placed at a substation to help control voltage on a transmission system. The No Action Alternative assumes that no new transmission line is built, and no other equipment is added to the transmission system

  10. Federal Administrative Court dismisses action of a nuclear power opponent against Grafenrheinfeld nuclear power plant

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    With its decision of April 30, 1980 - BVerwG 7 C 88.79-, the Federal Administrative Court has dismissed an appeal against the decision of the Bavarian Administrative Court, in which the plaintiff's action had been dismissed. The cost of the appeal suit will be paid by the plaintiff. The value in litigation was set at DM 20,000 for the appeal proceedings. The grounds for the decision are given in full wording. (orig./HP) [de

  11. Southwestern Power Administration Annual Report 2004-2006

    Energy Technology Data Exchange (ETDEWEB)

    None

    2006-01-01

    Confidence Commitment Cooperation These are words that spring to mind regarding Southwestern Power Administration’s performance during fiscal years (FY) 2004-2006 By offering innovative, customer-oriented service, working to improve system reliability and efficiency, and partnering with customers and other Federal power stakeholders, Southwestern has certainly exhibited all three of these qualities during these challenging yet productive years In fact, our cooperative working relationships were critical to our success during the severe and widespread drought conditions which prevailed throughout Southwestern’s marketing area for much of 2005-2006 When we proposed a temporary energy deferral program, our customers came on board by voluntarily taking less Federal hydropower than they were entitled to, enabling us to preserve system storage and fulfill our contract obligations during the crucial summer months of 2006 The U S Army Corps of Engineers (Corps) also helped improve our drought situation by allowing Southwestern more operational flexibility on a regional level Despite the challenges this critical drought period presented, Southwestern remained committed to fulfilling our mission and strategic goals From FY 2004 through FY 2006, we marketed and delivered all available Federal hydropower while meeting and even exceeding the reliability standards of the North American Electric Reliability Corporation (NERC) Our Power Operations Training Center in Springfield, Missouri, was cited as an “Example of Excellence” during a NERC readiness audit in October 2006; and as we have every year since NERC began measuring, Southwestern far exceeded the accepted NERC compliance ratings for power system operations reliability Our commitment to excellence and accountability has kept our repayment goals on target as well Revenues were sufficient to repay all annual expenses and the required principal investment in the Federal hydropower facilities Furthermore, the original

  12. 77 FR 2521 - Integrated System Power Rates

    Science.gov (United States)

    2012-01-18

    .... James K. McDonald, Administrator, Southwestern Power Administration, Department of Energy, Williams Center Tower I, One West Third Street, Tulsa, Oklahoma 74103, (918) 595-6690, jim.mcdonald@swpa.gov... Commission. Available: In the marketing area of Southwestern Power Administration (Southwestern), described...

  13. PowerCube: Integrated Power, Propulsion, and Pointing for CubeSats, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Tethers Unlimited, Inc. proposes to develop the PowerCube, an integrated power, propulsion, and pointing solution for CubeSats. The PowerCube combines three...

  14. Pulsed Power Science and Technology: A Strategic Outlook for the National Nuclear Security Administration (Summary)

    Energy Technology Data Exchange (ETDEWEB)

    Sinars, Daniel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Scott, Kimberly Carole [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Edwards, M. John [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Olson, Russell Teall [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-10-17

    Major advances in pulsed power technology and applications over the last twenty years have expanded the mission areas for pulsed power and created compelling new opportunities for the Stockpile Stewardship Program (SSP). This summary document is a forward look at the development of pulsed power science and technology (PPS&T) capabilities in support of the next 20 years of the SSP. This outlook was developed during a three-month-long tri-lab study on the future of PPS&T research and capabilities in support of applications to: (1) Dynamic Materials, (2) Thermonuclear Burn Physics and Inertial Confinement Fusion (ICF), and (3) Radiation Effects and Nuclear Survivability. It also considers necessary associated developments in next-generation codes and pulsed power technology as well as opportunities for academic, industry, and international engagement. The document identifies both imperatives and opportunities to address future SSP mission needs. This study was commissioned by the National Nuclear Security Administration (NNSA). A copy of the memo request is contained in the Appendix. NNSA guidance received during this study explicitly directed that it not be constrained by resource limitations and not attempt to prioritize its findings against plans and priorities in other areas of the national weapons program. That prioritization, including the relative balance amongst the three focus areas themselves, must of course occur before any action is taken on the observations presented herein. This unclassified summary document presents the principal imperatives and opportunities identified in each mission and supporting area during this study. Preceding this area-specific outlook, we discuss a cross-cutting opportunity to increase the shot capacity on the Z pulsed power facility as a near-term, cost-effective way to broadly impact PPS&T for SSP as well as advancing the science and technology to inform future SSMP milestones over the next 5-10 years. The final page of the

  15. Pulsed Power Science and Technology: A Strategic Outlook for the National Nuclear Security Administration (Summary)

    International Nuclear Information System (INIS)

    Sinars, Daniel; Scott, Kimberly Carole; Edwards, M. John; Olson, Russell Teall

    2016-01-01

    Major advances in pulsed power technology and applications over the last twenty years have expanded the mission areas for pulsed power and created compelling new opportunities for the Stockpile Stewardship Program (SSP). This summary document is a forward look at the development of pulsed power science and technology (PPS&T) capabilities in support of the next 20 years of the SSP. This outlook was developed during a three-month-long tri-lab study on the future of PPS&T research and capabilities in support of applications to: (1) Dynamic Materials, (2) Thermonuclear Burn Physics and Inertial Confinement Fusion (ICF), and (3) Radiation Effects and Nuclear Survivability. It also considers necessary associated developments in next-generation codes and pulsed power technology as well as opportunities for academic, industry, and international engagement. The document identifies both imperatives and opportunities to address future SSP mission needs. This study was commissioned by the National Nuclear Security Administration (NNSA). A copy of the memo request is contained in the Appendix. NNSA guidance received during this study explicitly directed that it not be constrained by resource limitations and not attempt to prioritize its findings against plans and priorities in other areas of the national weapons program. That prioritization, including the relative balance amongst the three focus areas themselves, must of course occur before any action is taken on the observations presented herein. This unclassified summary document presents the principal imperatives and opportunities identified in each mission and supporting area during this study. Preceding this area-specific outlook, we discuss a cross-cutting opportunity to increase the shot capacity on the Z pulsed power facility as a near-term, cost-effective way to broadly impact PPS&T for SSP as well as advancing the science and technology to inform future SSMP milestones over the next 5-10 years. The final page of the

  16. NEITHER FISH NOR FOWL: ADMINISTRATIVE JUDGES IN THE MODERN ADMINISTRATIVE STATE

    Directory of Open Access Journals (Sweden)

    Russell L. Weaver

    2010-10-01

    Full Text Available This article examines the role of administrative adjudication in the United States constitutional system. It begins by noting that such adjudication fits uncomfortably within a system of divided powers. Administrative judges, including administrative law judges [ALJs] (who have the highest level of protection and status, are considerably more circumscribed than ordinary Article III judges. Indeed, administrative judges are usually housed in the agencies for which they decide cases, rather than in independent adjudicative bodies, and they do not always have the final say regarding the cases they decide. In many instances, the agency can appeal an adverse administrative judge’s decision directly to the head of the agency, and the agency head retains broad power to overrule the administrative judge’s determinations. In other words, the agency can substitute its judgment for that of the administrative judge regarding factual determinations, legal determinations, and policy choices. As a result, many administrative adjudicative structures involve difficult tradeoffs between independence, political control, and accountability. This article examines issues related to the status and power of administrative judges, as well as the constraints that have been imposed on administrative adjudicative authority, and explores whether those constraints continue to serve the purposes for which they were originally imposed. Cet article examine le rôle du règlement de différends dans le domaine administratif dans le cadre du système constitutionnel des États-Unis. Il note d’abord qu’une telle façon de régler les différends cadre difficilement avec un système où les pouvoirs sont divisés. Les juges administratifs, y inclus les juges de droit administratif (qui jouissent du niveau le plus élevé de protection et de statut, sont considérablement plus restreints que les juges ordinaires sous l’Article III. En effet, les juges administratifs sont

  17. The changing power equation in hospitals.

    Science.gov (United States)

    Rayburn, J M; Rayburn, L G

    1997-01-01

    This research traces the origins, development, and reasons for change in the power equation in the U.S. hospitals between physicians, administrators and accountants. The paper contains three major sections: a review of the literature concerning authority, power, influence, and institutional theory; a review of the development of the power of professions, especially physicians, accounting and healthcare administrators, and the power equilibrium of a hospital; and, a discussion of the social policy implications of the power struggle. The basis for physicians' power derives from their legal ability to act on which others are dependent, such as choosing which hospital to admit patients, order tests and procedures for their patients. The Federal Government's prospective payment system and the hospitals' related case-mix accounting systems appear to influence the power structure in hospitals by redistributing that power. The basis of the accountants' power base is control of financial information. Accountants have a definite potential for influencing which departments receive financial resources and for what purpose. This moves hospital accountants into the power equation. The basis of the hospital administrators' power is their formal authority in the organization. Regardless of what actions federal government agencies, hospital accountants, or hospital administrators take, physicians are expected to remain the dominant factor in the power equation. Without major environmental changes to gain control of physician services, only insignificant results in cost containment will occur.

  18. 1993 Pacific Northwest Loads and Resources Study, Technical Appendix: Volume 2, Book 1, Energy.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-12-01

    The 1993 Pacific Northwest Loads and Resources Study establishes the Bonneville Power Administration`s (BPA) planning basis for supplying electricity to BPA customers. The Loads and Resources Study is presented in three documents: (1) this technical appendix detailing loads and resources for each major Pacific and Northwest generating utility, (2) a summary of Federal system and Pacific Northwest region loads and resources, and (3) a technical appendix detailing forecasted Pacific Northwest economic trends and loads. This analysis updates the 1992 Pacific Northwest Loads and Resources Study Technical Appendix published in December 1992. This technical appendix provides utility-specific information that BPA uses in its long-range planning. It incorporates the following for each utility (1) Electrical demand firm loads; (2) Generating resources; and (3) Contracts both inside and outside the region. This document should be used in combination with the 1993 Pacific Northwest Loads and Resources Study, published in December 1993, because much of the information in that document is not duplicated here.

  19. BPA Facts

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-03-01

    The Bonneville Power Administration is a federal nonprofit power marketing administration based in the Pacific Northwest . Although BPA is part of the U .S . Department of Energy, it is self-funding and covers its costs by selling its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small nonfederal power plants . The dams are operated by the U .S . Army Corps of Engineers and the Bureau of Reclamation . About 30 percent of the electric power used in the Northwest comes from BPA . BPA’s resources — primarily hydroelectric — make its power nearly carbon free . BPA also operates and maintains about three- fourths of the high-voltage transmission in its service territory . BPA’s service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming . BPA promotes energy efficiency, renewable resources and new technologies that improve its ability to deliver on its mission . BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River Basin . BPA is committed to public service and seeks to make its decisions in a manner that provides opportunities for input from stakeholders . In its vision statement, BPA dedicates itself to providing high system reliability, low rates consistent with sound business principles, environmental stewardship and accountability

  20. Governmental control of public expenditure in the constitutional State: thoughts regarding General Comptroller sanctioning powers approval on functional administrative responsibility

    Directory of Open Access Journals (Sweden)

    Erika García Cobián Castro

    2013-12-01

    Full Text Available Constitutional doctrine has little addressed on the General Comptroller of the Republic and its controlling function of public resources execution and management. Efforts have been made to explain this situation in other realities, regarding high budgetary, accounting and auditing content needed to carry out auditing activities constitutionally assigned to this kind of entities. Nevertheless, identifying competences of the General Comptroller of the Republic and its nature of autonomous constitutional body shapes an important expression of Constitutional State and the principle of powers division. This entity controls State’s Public Budget execution contributing to constitutional property protection, legality of budget implementation and the appropriate management of public resources, also the «efficiency» of social needs, proper functioning of public administration and prevention of corruption, among others duties. This article analyzes the constitutional mission of the General Comptroller in a Constitutional State promoting the process of given a constitutional status to the legal system in its area of influence, also optimizing constitutional properties protected. For such purpose, the 29622 recent law («Law that modifies the 27785 Organic Law of National Control System and the General Comptroller of the Republic extending powers in order to sanction in accordance of functional administrative responsibility» shall be used as object of constitutional analysis.

  1. 76 FR 56167 - Marine Mammals; Pinniped Removal Authority

    Science.gov (United States)

    2011-09-12

    ... problem interactions. See http://www.nwr.noaa.gov/Marine-Mammals/Seals-and-Sea-Lions/Sec-120-Authority.cfm... to the pinniped predation problem at Bonneville Dam and is not a na[iuml]ve animal that can be driven... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA681 Marine...

  2. Voices of nuclear power monitors in fiscal 1982

    International Nuclear Information System (INIS)

    1984-01-01

    The system of nuclear power monitors was set up to hear candid opinions, etc. from general people on nuclear power development and utilization, and reflect them to nuclear power administration. As the monitors, 416 persons were selected across the country. The results in fiscal 1982 are described. (1) Questionnaire survey: Of the 416, 314 persons answered the questionnaire conducted in March, 1983, on future energy, nuclear power development, nuclear power safety administration, and nuclear power P.R. activities. (2) Occasional voices of monitors: Of the total 74 opinions, etc. from the monitors in fiscal 1982, 31 concerned the nuclear power P.R. activities, followed by 16 on nuclear power development and utilization, and 12 on nuclear power administration. (Mori, K.)

  3. 2014 annual site environmental report, Southwestern Power Administration

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-12-31

    Southwestern Power Administration’s Annual Site Environmental Report (ASER) serves as the chief reporting mechanism for site environmental performance information within the Department of Energy and as a valuable resource for shared and collaborative environmental protection and performance information to Agency stakeholders and members of the public living near Southwestern Power Administration’s (Southwestern) facilities and transmission line rights-of-ways. This ASER meets the requirements of Department of Energy (DOE) Order 231.B. Southwestern’s key environmental involvement includes an emphasis on the protection of ecological resources which is effectively accomplished through environmental program elements such as protecting water resources, generation of clean hydropower energy, oil spill prevention practices, elimination of green-house gas emissions, and comprehensive project reviews to ensure the protection of living organisms, migratory birds, Federally threatened or endangered species, and historic or cultural resources. Southwestern continues to actively minimize effects to natural resources and strive for continual improvement in the area of environmental compliance and sustainability while achieving the agency mission to market and deliver Federal hydroelectric power.

  4. 49 CFR 1503.607 - Administrative law judges.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Administrative law judges. 1503.607 Section 1503... PROCEDURES Rules of Practice in TSA Civil Penalty Actions § 1503.607 Administrative law judges. (a) Powers of...) Administer oaths and affirmations. (4) Issue subpoenas authorized by law. (5) Rule on offers of proof. (6...

  5. 77 FR 40609 - Robert D. Willis Power Rate

    Science.gov (United States)

    2012-07-10

    .... James K. McDonald, Administrator, Southwestern Power Administration, U.S. Department of Energy, One West Third Street, Tulsa, Oklahoma 74103, (918) 595-6690, jim.mcdonald@swpa.gov . SUPPLEMENTARY INFORMATION.... RA 6120.2 entitled Power Marketing Administration Financial Reporting. Procedures for Public...

  6. Indoor air quality issues related to the acquisition of conservation in commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, M.C.; Hadley, D.L.; Marseille, T.J.

    1990-09-01

    The quality of indoor air in commercial buildings is dependent on the complex interaction between sources of indoor pollutants, environmental factors within buildings such as temperature and humidity, the removal of air pollutants by air-cleaning devices, and the removal and dilution of pollutants from outside air. To the extent that energy conservation measures (ECMs) may affect a number of these factors, the relationship between ECMs and indoor air quality is difficult to predict. Energy conservation measures may affect pollutant levels in other ways. Conservation measures, such as caulking and insulation, may introduce sources of indoor pollutants. Measures that reduce mechanical ventilation may allow pollutants to build up inside structures. Finally, heating, ventilation, and air-conditioning (HVAC) systems may provide surface areas for the growth of biogenic agents, or may encourage the dissemination of pollutants throughout a building. Information about indoor air quality and ventilation in both new and existing commercial buildings is summarized in this report. Sick building syndrome and specific pollutants are discussed, as are broader issues such as ventilation, general mitigation techniques, and the interaction between energy conservation activities and indoor air quality. Pacific Northwest Laboratory (PNL) prepared this review to aid the Bonneville Power Administration (Bonneville) in its assessment of potential environmental effects resulting from conservation activities in commercial buildings. 76 refs., 2 figs., 19 tabs.

  7. Wildlife Mitigation Program. Record of Decision

    International Nuclear Information System (INIS)

    1997-06-01

    Bonneville Power Administration (BPA) has decided to adopt a set of Descriptions (goals, strategies, and procedural requirements) that apply to future BPA-funded wildlife mitigation projects. Various. sources-including Indian tribes, state agencies, property owners, private conservation groups, or other Federal agencies-propose wildlife mitigation projects to the Northwest Power Planning Council (Council) for BPA funding. Following independent scientific and public reviews, Council then selects projects to recommend for BPA funding. BPA adopts this set of prescriptions to standardize the planning and implementation of individual wildlife mitigation projects. This decision is based on consideration of potential environmental impacts evaluated in BPA's Wildlife Mitigation Program Final Environmental Impact Statement (DOE/EIS-0246) published March, 20, 1997, and filed with the Environmental Protection Agency (EPA) the week of March 24, 1997 (EPA Notice of Availability Published April 4, 1997, 62 FR 65, 16154). BPA will distribute this Record of Decision to all known interested and affected persons, groups, tribes, and agencies

  8. Load Composition Model Workflow (BPA TIP-371 Deliverable 1A)

    Energy Technology Data Exchange (ETDEWEB)

    Chassin, David P.; Cezar, Gustavo V.; /SLAC

    2017-07-17

    This project is funded under Bonneville Power Administration (BPA) Strategic Partnership Project (SPP) 17-005 between BPA and SLAC National Accelerator Laboratory. The project in a BPA Technology Improvement Project (TIP) that builds on and validates the Composite Load Model developed by the Western Electric Coordinating Council's (WECC) Load Modeling Task Force (LMTF). The composite load model is used by the WECC Modeling and Validation Work Group to study the stability and security of the western electricity interconnection. The work includes development of load composition data sets, collection of load disturbance data, and model development and validation. This work supports reliable and economic operation of the power system. This report was produced for Deliverable 1A of the BPA TIP-371 Project entitled \\TIP 371: Advancing the Load Composition Model". The deliverable documents the proposed work ow for the Composite Load Model, which provides the basis for the instrumentation, data acquisition, analysis and data dissemination activities addressed by later phases of the project.

  9. Mid-Columbia coho reintroduction feasibility project. Preliminary environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    Before the Bonneville Power Administration (BPA) decides whether to fund a program to reintroduce coho salmon to mid-Columbia River basin tributaries, research is needed to determine the ecological risks and biological feasibility of such an effort. Since the early 1900s, the native stock of coho has been decimated in the tributaries of the middle reach of the Columbia River. The four Columbia River Treaty Tribes identified coho reintroduction in the mid-Columbia as a priority in the Tribal Restoration Plan. It is a comprehensive plan put forward by the Tribes to restore the Columbia River fisheries. In 1996, the Northwest Power Planning Council (NPPC) recommended the tribal mid-Columbia reintroduction project for funding by BPA. It was identified as one of fifteen high-priority supplementation projects for the Columbia River basin, and was incorporated into the NPPC's Fish and Wildlife Program. The release of coho from lower Columbia hatcheries into mid-Columbia tributaries is also recognized in the Columbia River Fish Management Plan

  10. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

    2012-05-31

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

  11. Amendment of the assured delivery provisions of BPA's Long-Term Intertie Access Policy and increased assured delivery: Access for non-scheduling utilities. Record of decision

    International Nuclear Information System (INIS)

    1994-06-01

    Bonneville Power Administration's BPA's preferred alternative for providing non-Federal Pacific Northwest-Pacific Southwest (PNW-PSW) Intertie access is to adopt the Capacity Ownership alternative combined with the Increased Assured Delivery--Access for Non-Scheduling Utilities alternative. BPA's decision to offer Capacity Ownership was documented in a March 1994 Non-Federal Capacity Ownership Record of Decision (ROD). This ROD documents BPA's decision to facilitate PNW-PSW Intertie access by proceeding with (1) bidirectional Increased Assured Delivery--Access for Non Scheduling Utilities; and (2) amending the Assured Delivery provisions of BPA's Long-Term Intertie Access Policy (LTIAP). Given that the various non-Federal PNW-PSW Intertie access alternatives in the NFP EIS all allowed for different types of contracts, little environmental impact difference among the alternatives was found. Rather, environmental impact was found to be associated with whether exchange contracts or firm power sales contracts would predominate. Such impacts and related environmental analysis are discussed further in section 3.0 of this ROD

  12. Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY10 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.

    2010-10-26

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. The EOS is one of multiple work groups in the federal research, monitoring, and evaluation (RME) effort developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the FCRPS. The EOS is tasked by NOAA Fisheries and the Action Agencies to design and coordinate implementation of the federal RME plan for the lower Columbia River and estuary, including the plume.

  13. Mid-Columbia Coho Salmon Reintroduction Feasibility Project : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State) Department of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation

    1999-01-01

    Before the Bonneville Power Administration (BPA) decides whether to fund a program to reintroduce coho salmon to mid-Columbia River basin tributaries, research is needed to determine the ecological risks and biological feasibility of such an effort. Since the early 1900s, the native stock of coho has been decimated in the tributaries of the middle reach of the Columbia River. The four Columbia River Treaty Tribes identified coho reintroduction in the mid-Columbia as a priority in the Tribal Restoration Plan. It is a comprehensive plan put forward by the Tribes to restore the Columbia River fisheries. In 1996, the Northwest Power Planning Council (NPPC) recommended the tribal mid-Columbia reintroduction project for funding by BPA. It was identified as one of fifteen high-priority supplementation projects for the Columbia River basin, and was incorporated into the NPPC`s Fish and Wildlife Program. The release of coho from lower Columbia hatcheries into mid-Columbia tributaries is also recognized in the Columbia River Fish Management Plan.

  14. Magnetic energy storage

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1980-01-01

    The fusion program embraces low loss superconductor strand development with integration into cables capable of carrying 50 kA in pulsed mode at high fields. This evolvement has been paralleled with pulsed energy storage coil development and testing from tens of kJ at low fields to a 20 MJ prototype tokamak induction coil at 7.5 T. Energy transfer times have ranged from 0.7 ms to several seconds. Electric utility magnetic storage for prospective application is for diurnal load leveling with massive systems to store 10 GWh at 1.8 K in a dewar structure supported on bedrock underground. An immediate utility application is a 30 MJ system to be used to damp power oscillations on the Bonneville Power Administration electric transmission lines. An off-shoot of this last work is a new program for electric utility VAR control with the potential for use to suppress subsynchronous resonance. This paper presents work in progress, work planned, and recently completed unusual work

  15. Facilitation of the Estuary/Ocean Subgroup and the Expert Regional Technical Group, Fiscal Year 2013 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Sather, Nichole K.

    2013-10-30

    This project covers facilitation of the Estuary/Ocean Subgroup (EOS) for federal research, monitoring, and evaluation (RME) and the Expert Regional Technical Group (ERTG) for estuary habitat restoration. The EOS is part of the research, monitoring, and evaluation effort that the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers [Corps], U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The EOS is tasked by National Marine Fisheries Service (NMFS) and the Action Agencies (AAs) to design and coordinate implementation of the federal RME plan for the lower Columbia River and estuary, including the river’s plume in the ocean. Initiated in 2002, the EOS is composed of members from BPA, the Corps, NMFS, and Pacific Northwest National Laboratory’s (PNNL’s) Marine Sciences Laboratory, and other agencies as necessary.

  16. Microsoft Hyper-V PowerShell automation

    CERN Document Server

    Menon, Vinith

    2015-01-01

    This book is great for administrators who are new to automating Hyper-V administration tasks using PowerShell. If you are familiar with the PowerShell command line and have some experience with the Windows Server, this book is perfect for you.

  17. 76 FR 50726 - Integrated System Power Rates: Correction

    Science.gov (United States)

    2011-08-16

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Integrated System Power Rates: Correction AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of public review and comment; Correction... date listed for the combined Public Information and Comment Forum (Forum) was erroneously listed in the...

  18. Draft 1992 Resource Program : Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  19. Draft 1992 Resource Program : Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  20. Nuclear export policy of the Reagan Administration

    Energy Technology Data Exchange (ETDEWEB)

    Pilat, J F; Donnelly, W H [Library of Congress, Washington, DC (USA)

    1983-06-01

    The Reagan Administration maintains the Carter Administration's objective of non-proliferation of nuclear weapons as being fundamental to US nuclear export policy. However, it sees the USA as having another important role to play in influencing the use of nuclear power and the trading of related goods and technologies in other countries. While the Administration believes its policies will prove beneficial to the USA, there is concern that trade considerations are being given priority over preventing the proliferation of nuclear weapons.

  1. Fundamentals of the administrative decentralization process

    Directory of Open Access Journals (Sweden)

    Mihaela Lupăncescu

    2017-12-01

    Full Text Available Public administration, as an activity carried out by the administrative authorities, can be achieved through several forms of organization. In this sense, centralization, deconcentration and decentralization, together with its corollary, local autonomy, constitute in organizational regimes of an administrative nature, more or less democratic, and with characteristics that vary according to the degree of dependence between the authorities of the public administration institutions at the central level and local public administration authorities.There is no single form of organization that incorporates the characteristics of a particular regime. The complex expectations of modern society have led to the blending of features of different forms of organization in order to create a balance of activity within the public administration, in order to exercise the functions of executive power for the benefit of citizens, not by conferring unlimited autonomy but by considering the fundamental principle of legality.

  2. Monitoring and evaluation of smolt migration in the Columbia Basin, Volume II: Evaluation of the 1996 predictions of the run-timing of wild migrant subyearling chinook in the Snake River Basin using Program RealTime.; TOPICAL

    International Nuclear Information System (INIS)

    Skalski, John R.; Townsend, Richard L.; Yasuda, Dean

    1998-01-01

    This project was initiated in 1991 in response to the Endangered Species Act (ESA) listings in the Snake River Basin of the Columbia River Basin. Primary objectives and management implications of this project include: (1)to address the need for further synthesis of historical tagging and other biological information to improve understanding and identify future research and analysis needs; (2)to assist in the development of improved monitoring capabilities, statistical methodologies and software tools to aid management in optimizing operational and fish passage strategies to maximize the protection and survival of listed threatened and endangered Snake River salmon populations and other listed and nonlisted stocks in the Columbia River Basin; (3)to design better analysis tools for evaluation programs; and (4)to provide statistical support to the Bonneville Power Administration and the Northwest fisheries community

  3. Monitoring and evaluation of smolt migration in the Columbia River Basin; Volume 1; Evaluation of the 1995 predictions of the run-timing of wild migrant subyearling chinook in the Snake River Basin using Program RealTime

    International Nuclear Information System (INIS)

    Skalski, John R.; Townsend, Richard L.; Yasuda, Dean

    1997-01-01

    This project was initiated in response to the Endangered Species Act (ESA) listings in the Snake River Basin of the Columbia River Basin. Primary objectives and management implications of the project include: (1)to address the need for further synthesis of historical tagging and other biological information to improve understanding and to help identify future research and analysis needs; (2)to assist in the development of improved monitoring capabilities, statistical methodologies and software tools to assist in optimizing operational and fish passage strategies to maximize the protection and survival of listed threatened and endangered Snake River salmon populations and other listed and nonlisted stocks in the Columbia River Basin; and (3)to design better analysis tools for evaluation programs; and (4)to provide statistical support to the Bonneville Power Administration and the Northwest fisheries community

  4. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hockersmith, Eric E.

    1999-03-01

    This report consists of two parts describing research activities completed during 1997 under Bonneville Power Administration Project Number 93-29. Part 1 provides reach survival and travel time estimates for 1997 for PIT-tagged hatchery steelhead and yearling chinook salmon in the Snake and Columbia Rivers. The results are reported primarily in the form of tables and figures with a minimum of text. More detailed information on methodology and the statistical models used in the analysis are provided in previous annual reports cited in the text. Analysis of the relationships among travel time, survival, and environmental factors for 1997 and previous years of the study will be reported elsewhere. Part 2 of this report describes research to determine areas of loss and delay for juvenile hatchery salmonids above Lower Granite Reservoir.

  5. Electricity Use in the Pacific Northwest: Utility Historical Sales by Sector, 1989 and Preceding Years.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-06-01

    This report officially releases the compilation of regional 1989 retail customer sector sales data by the Bonneville Power Administration. This report is intended to enable detailed examination of annual regional electricity consumption. It gives statistics covering the time period 1970--1989, and also provides observations based on statistics covering the 1983--1989 time period. The electricity use report is the only information source that provides data obtained from each utility in the region based on the amount of electricity they sell to consumers annually. Data is provided on each retail customer sector: residential, commercial, industrial, direct-service industrial, and irrigation. The data specifically supports forecasting activities, rate development, conservation and market assessments, and conservation and market program development and delivery. All of these activities require a detailed look at electricity use. 25 figs., 34 tabs.

  6. Walla Walla River Basin Fish Habitat Enhancement Project, 2000-2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Volkman, Jed; Sexton, Amy D. (Confederated Tribes of the Umatilla Indian Reservation, Pendleton, OR)

    2001-01-01

    In 2000, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of these efforts is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. Six projects, two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and one property on the mainstem Walla Walla River were part of the exercise. Several thousand native plants as bare-root stock and cuttings were reintroduced to the sites and 18 acres of floodplain corridor was seeded with native grass seed. Pre and post-project monitoring efforts were included for all projects, incorporating methodologies from CTUIR's Draft Monitoring Plan.

  7. Hydromania II: Journey of the Oncorhynchus. Summer Science Camp Curriculum 1994.

    Energy Technology Data Exchange (ETDEWEB)

    Moura, Joan; Swerin, Rod

    1995-01-01

    The Hydromania II curriculum was written for the third in a series of summer science camp experiences targeting students in grades 4--6 who generally have difficulty accessing supplementary academic programs. The summer science camp in Portland is a collaborative effort between Bonneville Power Administration (BPA), the US Department of Energy (DOE), and the Portland Parks and Recreation Community Schools Program along with various other cooperating businesses and organizations. The curriculum has also been incorporated into other summer programs and has been used by teachers to supplement classroom activities. Camps are designed to make available, affordable learning experiences that are fun and motivating to students for the study of science and math. Inner-city, under-represented minorities, rural, and low-income families are particularly encouraged to enroll their children in the program.

  8. Interim Columbia and Snake rivers flow improvement measures for salmon: Final Supplemental Environmental Impact Statement (SEIS)

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    Public comments are sought on this final SEIS, which supplements the 1992 Columbia River Salmon Flow Measures Options Analysis (OA)/Environmental Impact Statement (EIS). The Corps of Engineers, in cooperation with the Bonneville Power Administration and the Bureau of Reclamation proposes five alternatives to improve flows of water in the lower Columbia-Snake rivers in 1993 and future years to assist the migration of juvenile and adult anadromous fish past eight hydropower dams. These are: (1) Without Project (no action) Alternative, (2) the 1992 Operation, (3) the 1992 Operation with Libby/Hungry Horse Sensitivity, (4) a Modified 1992 Operation with Improvements to Salmon Flows from Dworshak, and (5) a Modified 1992 Operation with Upper Snake Sensitivity. Alternative 4, Modified 1992 Operations, has been identified as the preferred alternative.

  9. A Study to Determine the Biological Feasibility of a New Fish Tagging System : Annual Report 1990-1993.

    Energy Technology Data Exchange (ETDEWEB)

    Prentice, Earl F.; Maynard, D.J.; Downing, S.L. (and others)

    1994-01-01

    In 1983, the National Marine Fisheries Service (NMFS) began a multiyear cooperative research program with the Bonneville Power Administration (BPA) to evaluate a new miniaturized identification system that could be used with salmonids. The system is referred to as the passive-integrated-transponder (PIT) tagging and interrogation system. The program has focused on determining the effects of PIT tags on juvenile and adult salmonids, as well as the development and evaluation of tagging and interrogation methods. Earlier results of the program have been reported in annual reports and journal articles cited in this report. This report covers the work per formed from 1990 through 1993. For convenience, the report is divided into three sections: (1) Interrogation and separation systems at Columbia River Basin dams; (2) Systems development and evaluation; and (3) Information and technology transfer.

  10. Longview District Operations and Maintenance Headquarters: Environmental assessment

    International Nuclear Information System (INIS)

    1992-03-01

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives

  11. Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.Gordon

    1991-10-01

    The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

  12. AES Modular Power Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Modular Power Systems (AMPS) project will demonstrate and infuse modular power electronics, batteries, fuel cells, and autonomous control for exploration...

  13. Nuclear relations with administrations of industry services

    International Nuclear Information System (INIS)

    Bernardez Garcia, A.

    2011-01-01

    The object of the article is to try to answer to the following question that can arise to the holder of a nuclear power station: What Administration of Industry must I myself direct to be able to support my complementary facilities of Industrial Security inside the in force legality?. The raised discussion arise between if the competent administration for the legal steps, is the Central Administration across his delegates and sub delegates of government, or is of the Territorial Services of Industry of Autonomous communities. (Author)

  14. Draft environmental impact statement - BPA/Lower Valley transmission project

    International Nuclear Information System (INIS)

    1997-06-01

    Bonneville Power Administration and Lower Valley Power and Light, Inc., propose to solve a voltage stability problem in the Jackson and Afton, Wyoming areas. For the Agency Proposed Action, BPA and Lower Valley would construct a new 115-kV line from BPA's Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA's Teton Substation near Jackson in Teton County, Wyoming. The new line would be next to an existing 115-kV line. Most of the line would be supported by a mix of single-circuit wood pole H-frame structures would be used. The Single-Circuit Line Alternative has all the components of the Agency Proposed Action except that the entire line would be supported by single-circuit structures. The Short Line Alternative has all the components of the Single-Circuit Line Alternative except it would then be removed. For the Static Var Compensation Alternative, BPA would install a Static Var Compensator (SVC) at Teton or Jackson Substation. An SVC is a group of electrical equipment placed at a substation to help control voltage on a transmission system. The No Action Alternative assumes that no new transmission line is built, and no other equipment is added to the transmission system. The USFS (Targhee and Bridger-Teton National Forests) must select al alternative based on their needs and objectives, decide if the project complies with currently approved forest plans, decide if special use permits or easements are needed for construction, operation, and maintenance of project facilities, and decide if they would issue special use permits and letters of consent to grant easements for the project

  15. Facilitation of the Estuary/Ocean Subgroup and the Expert Regional Technical Group, Annual Report for 2015

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-08-01

    This document is the annual report for the period September 1, 2014 through August 31, 2015 for the project—Facilitation of the Estuary/Ocean Subgroup (EOS) and the Expert Regional Technical Group (ERTG). Pacific Northwest National Laboratory (PNNL) conducted the project for the Bonneville Power Administration (BPA). The EOS and ERTG are part of the research, monitoring, and evaluation (RME) and habitat restoration efforts, respectively, developed by the Action Agencies (BPA, U.S. Army Corps of Engineers [Corps or USACE], and U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS) and implemented under the Columbia Estuary Ecosystem Restoration Program (CEERP). BPA/Corps (2015) explain the CEERP and the role of RME and the ERTG. For the purposes of this report, the lower Columbia River and estuary (LCRE) includes the floodplain from Bonneville Dam down through the lower river and estuary into the river’s plume in the ocean. The main purpose of this project is to facilitate EOS and ERTG meetings and work products. Other purposes are to provide technical support for CEERP adaptive management, CEERP restoration design challenges, and tributary RME. From 2002 through 2008, the EOS worked to design the federal RME program for the estuary/ocean (Johnson et al. 2008). From 2009 to the present day, EOS activities have involved RME implementation; however, EOS activities were minimal during the current reporting period. PNNL provided technical support to CEERP’s adaptive management process by convening 1.2 meetings of the Action Agencies (AAs) and drafting material for the “CEERP 2015 Restoration and Monitoring Plan” (BPA/Corps 2015).

  16. Combination N-Way Power Divider/Combiner and Noninvasive Reflected Power Detection

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — An N-way RF/microwave power divider/combiner utilizes one input and N outputs, or conversely N inputs and one output to divide (or combine) RF/microwave power while...

  17. Pro SharePoint 2013 administration

    CERN Document Server

    Garrett, Robert

    2013-01-01

    Pro SharePoint 2013 Administration is a practical guide to SharePoint 2013 for intermediate to advanced SharePoint administrators and power users, covering the out-of-the-box feature set and capabilities of Microsoft's collaboration and business productivity platform. SharePoint 2013 is an incredibly complex product, with many moving parts, new features, best practices, and 'gotchas.' Author Rob Garrett distills SharePoint's portfolio of features, capabilities, and utilities into an in-depth professional guide-with no fluff and copious advice-that is designed from scratch to be the manual Micr

  18. Reagan's concept of federalism and nuclear power

    International Nuclear Information System (INIS)

    Axelrod, R.S.; Wilson, H.A.

    1991-01-01

    The 'New Federation' of the Reagan Administration was a doctrine to reduce regulations and devolve government functions to State and local governments. However, when these goals competed with other substantive goals, eg the promotion of nuclear power, the Administration chose to advance the latter. State and local governments utilized the NRC requirement for their participation in the planning and implementation of an evacuation plan to prevent the licensing of the Shoreham nuclear power plant. This strategy was contested by the national Administration which insisted on licensing the plant. The licensing of the Long Island Lighting Company's Shoreham nuclear power plant provides an opportunity to examine the role of nuclear power in highlighting the contradictions in Reagan's 'New Federation'. (author)

  19. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  20. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  1. The 1992 Pacific Northwest Residential Energy Survey: Phase 1 : Book 1 : Getting Started.

    Energy Technology Data Exchange (ETDEWEB)

    Applied Management & Planning Group (firm); United States. Bonneville Power Administration. End-Use Research Section.

    1993-08-01

    This Executive Summary outlines the general processes employed in and the major findings from the conduct of Phase I of the Pacific Northwest Residential Energy Survey (PNWRES92-I) during the last quarter of 1992. This study was Bonneville`s third comprehensive residential survey of the region, conducted to provide data on energy usage, conservation awareness and behaviors, and associated consumer characteristics for use in forecasting and planning. The summary is divided into four sections: Background sets the stage with respect to the need for the survey, relates it to previous work, outlines the implementation processes, and summarizes the data products. Profiling the respondents summarizes the survey results under these six categories: Demographics; Housing Units; Room Inventory; Appliance Inventory; Air-Conditioning/Heating; Water-Heating; and Opinion. Reports and cross-tabulations describes the various individual documents. Bonneville Power Plus provides a short description of an Excel-spreadsheet-based software program that contains all of the tabulated material in a format that encourages browsing among the tables and charts, with special feature that they can be copied directly into other Windows-based documents.

  2. History on foundation of Korea nuclear power

    International Nuclear Information System (INIS)

    Park, Ik Su

    1999-12-01

    This reports the history on foundation of Korea nuclear power from 1955 to 1980, which is divided ten chapters. The contents of this book are domestic and foreign affairs before foundation of nuclear power center, establishment of nuclear power and research center, early activity and internal conflict about nuclear power center, study for nuclear power business and commercialization of the studying ordeal over nuclear power administration and new phase, dispute for jurisdiction on nuclear power business and the process, permission for nuclear reactor, regulation and local administration, the process of deliberation and decision of reactor 3. 4 in Yonggwang, introduction of nuclear reprocessing facilities and activities for social organization.

  3. PowerCube: Integrated Power, Propulsion, and Pointing for CubeSats, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The PowerCube is a 1U CubeSat module that provides integrated propulsion, power, and precision pointing to enable the low-cost CubeSat platform to be used to conduct...

  4. VMware vSphere PowerCLI Reference Automating vSphere Administration

    CERN Document Server

    Dekens, Luc; Sizemore, Glenn; van Lieshout, Arnim; Medd, Jonathan

    2011-01-01

    Your One-Stop Reference for VMware vSphere Automation If you manage vSphere in a Windows environment, automating routine tasks can save you time and increase efficiency. VMware vSphere PowerCLI is a set of pre-built commands based on Windows PowerShell that is designed to help you automate vSphere processes involving virtual machines, datacenters, storage, networks, and more. This detailed guide-using a practical, task-based approach and real-world examples-shows you how to get the most out of PowerCLI's handy cmdlets. Learn how to: Automate vCenter Server and ESX/ESX(i) Server deployment and

  5. Nuclear Risk, Crisis, and Expertise: The Administrator's Role

    International Nuclear Information System (INIS)

    Gilbert, Claude

    2002-01-01

    The analysis of nuclear risk, one of the most important risks in France, allows us to pinpoint the possible role of the administrator in various situations. The latter has no political power (which devolves on elected representatives), nor does he possess the knowledge of the scientist, or expert in the field. With neither power nor scientific knowledge, he is expected to do what he has been trained to do: 'administer' people, things, knowledge, space and time, even when the combination of risk and crisis constitutes a threat to any and all order. The role of the administrator is thus to contribute to the organization and management of crisis and uncertainty

  6. Western GeoPower Corp. brochure : nature's own clean, renewable energy

    International Nuclear Information System (INIS)

    2004-10-01

    This brochure describes the most advanced geothermal project in Canada. British Columbia's Western GeoPower Corporation holds Canada's only geothermal lease issued for commercial production of electricity. The company's South Meager Geothermal Project is expected to bring 100 MW of generating capacity on stream in 2007 and an additional 100 MW in 2009. The project has a maximum potential of 250 MW. Geothermal energy was described as being the heat radiating from the Earth's molten core that can be harnessed to produce electricity, steam and hot water for industrial, commercial and residential use. This brochure explained how geothermal energy is created, where it is found, and its importance in the global energy scene. Potential geothermal power capacity is estimated to be 50,000 times the energy of all known petroleum reserves. Most countries of the Pacific Rim have developed geothermal resources to produce electricity. Iceland produces 80 per cent of its power requirements from geothermal energy. The cost of generating electricity from geothermal resources has been reduced by 25 per cent in the past decade due to technological advances. In addition, geothermal power plants receive incentives and premium prices related to their capacity. Geothermal power plants are extremely reliable and have a 95 per cent load capacity utilization. The thermal reservoir defined at South Meager has an areal extent of 4.5 to 7.5 square km and a thickness of 2,800 metres. This high temperature field located near Whistler, British Columbia is a major geothermal site with enough electricity for a city of about 500,000 people. The project is located near the province's main electricity grid which provides a direct link with the Bonneville Power Authority grid in the northwestern United States. The three phases of the South Meager Geothermal Project are: (1) resource confirmation in 2004-2005, (2) feasibility study, permitting and financing in 2005, and (3) project design and

  7. China's nuclear safety regulatory body: The national nuclear safety administration

    International Nuclear Information System (INIS)

    Zhang Shiguan

    1991-04-01

    The establishment of an independent nuclear safety regulatory body is necessary for ensuring the safety of nuclear installations and nuclear fuel. Therefore the National Nuclear Safety Administration was established by the state. The aim, purpose, organization structure and main tasks of the Administration are presented. At the same time the practical examples, such as nuclear safety regulation on the Qinshan Nuclear Power Plant, safety review and inspections for the Daya Bay Nuclear Power Plant during the construction, and nuclear material accounting and management system in the nuclear fuel fabrication plant in China, are given in order to demonstrate the important roles having been played on nuclear safety by the Administration after its founding

  8. The nuclear export policy of the Reagan administration

    International Nuclear Information System (INIS)

    Pilat, J.F.; Donnelly, W.H.

    1983-01-01

    tThe Reagan Administration maintains the Carter Administration's objective of non-proliferation of nuclear weapons as being fundamental to US nuclear export policy. However, it sees the USA as having another important role to play in influencing the use of nuclear power and the trading of related goods and technologies in other countries. While the Administration believes its policies will prove beneficial to the USA, there is concern that trade considerations are being given priority over preventing the proliferation of nuclear weapons. (author)

  9. Civil rights reference of administrative procedures

    International Nuclear Information System (INIS)

    Held, J.

    1984-01-01

    The book deals with the constitutional obligations which substantive civil rights demand from administrative procedures. The Federal Constitutional Court distinguishes between protection of civil rights in, and by, administrative and judicial procedures. The author analyses the example of the decision of the Federal Constitutional Court concerning the atomic power plant of Muelheim-Kaerlich. In the licensing procedure pursuant to the Atomic Energy Act, the civil rights of persons concerned are guaranteed by the governmental obligation to its protection. (CW) [de

  10. Silicon-Carbide (SIC) Multichip Power Modules (MCPMS) For Power Building Block Applications, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase I project seeks to prove the feasibility of developing high power density modular power electronic building blocks...

  11. 29 CFR 1955.12 - Administrative law judge; powers and duties.

    Science.gov (United States)

    2010-07-01

    ... U.S.C. 554-557 (hereinafter called the APA). (b) On any procedural question not otherwise regulated by this part, the Act, or the APA, the administrative law judge shall be guided to the extent...

  12. American National Standard administrative controls and quality assurance for the operational phase of nuclear power plants, revision of N18.7-1972

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    This Standard provides requirements and recommendations for an administrative controls and quality assurance program necessary to provide assurance that operational phase activities at nuclear power plants are carried out without undue risk to the health and safety of the public. The requirements of this Standard apply to all activities affecting the safety-related functions of nuclear power plant structures, systems, and components. It is not intended to apply to test mobile and experimental reactors nor reactors not subject to U. S. Nuclear Regulatory Commission licensing. However, applicable sections of this Standard should be used as they apply to related activities. Activities included are: design changes, purchasing, fabricating, handling, shipping, storing, cleaning, erecting, installing, inspecting, testing, operating, maintaining, repairing, refueling and modifying

  13. Green Applications for Space Power

    Data.gov (United States)

    National Aeronautics and Space Administration — Spacecraft propulsion and power for many decades has relied on Hydrazine monopropellant technology for auxiliary power units (APU), orbital circularization, orbit...

  14. Supplement analysis, Southpoint power project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-16

    The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration`s (Western) Parker-Davis project in western Arizona. Western, as a major electric transmission system owner is required by existing policies and regulations, to provide access to its transmission system, when requested by an eligible organization. The proposed interconnection would integrate a major source of new generation into the Parker-Davis system which would allow Calpine to supply its power to the electric wholesale market. Based on this application, Western`s proposed action is to enter into an interconnection agreement with Calpine.

  15. Solid-State Thermionic Nuclear Power for Megawatt Propulsion, Planetary Surface and Commercial Power Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Thermionic (TI) power conversion is a promising technology first investigated for power conversion in the 1960’s, and of renewed interest due to modern...

  16. Southwestern Power Administration Update, October- December 2004

    Energy Technology Data Exchange (ETDEWEB)

    None

    2004-12-01

    On October 29, 2004, Southwestern and Southwest Power Pool, Inc. (SPP) reached agreement on interim arrangements to be implemented after the October 31, 2004, expiration of the membership agreement between the two parties. According to Jim McDonald, Director of Southwestern’s Division of Customer Service, the interim agreement forged between Southwestern and SPP seeks to minimize impacts to SPP as well as to Southwestern and its customers while Southwestern and SPP work on a seams/coordination agreement to succeed the expired membership agreement.

  17. Ecology of Juvenile Salmonids in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta, Lower Columbia River, 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sobocinski, Kathryn; Johnson, Gary; Sather, Nichole [Pacific Northwest National Laboratory

    2008-03-17

    This document is the first annual report for the study titled 'Ecology of Juvenile Salmonids in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta in the Lower Columbia River'. Hereafter, we refer to this research as the Tidal Freshwater Monitoring (TFM) Study. The study is part of the research, monitoring, and evaluation effort developed by the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The project is performed under the auspices of the Northwest Power and Conservation Council's Columbia Basin Fish and Wildlife Program. The goal of the 2007-2009 Tidal Freshwater Monitoring Study is to answer the following questions: In what types of habitats within the tidal freshwater area of the lower Columbia River and estuary (LCRE; Figure 1) are yearling and subyearling salmonids found, when are they present, and under what environmental conditions?1 And, what is the ecological importance2 of shallow (0-5 m) tidal freshwater habitats to the recovery of Upper Columbia River spring Chinook salmon and steelhead and Snake River fall Chinook salmon? Research in 2007 focused mainly on the first question, with fish stock identification data providing some indication of Chinook salmon presence at the variety of habitat types sampled. The objectives and sub-objectives for the 2007 study were as follows: (1) Habitat and Fish Community Characteristics-Provide basic data on habitat and fish community characteristics for yearling and subyearling salmonids at selected sites in the tidal freshwater reach in the vicinity of the Sandy River delta. (1a) Characterize vegetation assemblage percent cover, conventional water quality, substrate composition, and beach slope at each of six sampling sites in various tidal freshwater habitat types. (1b

  18. Intercommunal cooperation for the purpose of satisfying local power demand

    International Nuclear Information System (INIS)

    Kieres, L.

    1992-01-01

    The article deals with the following: communal competences in the area of the power economy; forms of communal activity in the area of power supply; specific forms of communal cooperation; the procedure of communal cooperation; legal personality and internal organization; the local administration union as an instrument of power supply; categorization of the local administration union with respect to the legal system; the communal administrative agreement. (HSCH) [de

  19. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  20. Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    St. Hilaire, Danny R. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-02-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.

  1. Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

  2. Dormaier and Chester Butte 2007 Follow-up Habitat Evaluation Procedures Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-01-01

    Follow-up habitat evaluation procedures (HEP) analyses were conducted on the Dormaier and Chester Butte wildlife mitigation sites in April 2007 to determine the number of additional habitat units to credit Bonneville Power Administration (BPA) for providing funds to enhance, and maintain the project sites as partial mitigation for habitat losses associated with construction of Grand Coulee Dam. The Dormaier follow-up HEP survey generated 482.92 habitat units (HU) or 1.51 HUs per acre for an increase of 34.92 HUs over baseline credits. Likewise, 2,949.06 HUs (1.45 HUs/acre) were generated from the Chester Butte follow-up HEP analysis for an increase of 1,511.29 habitat units above baseline survey results. Combined, BPA will be credited with an additional 1,546.21 follow-up habitat units from the Dormaier and Chester Butte parcels.

  3. BPA's Eighth Annual Energy Conservation Management Conference : Proceedings.

    Energy Technology Data Exchange (ETDEWEB)

    Energy Conservation Management Conference (8th : 1981); United States. Bonneville Power Administration.

    1981-01-01

    The five-year energy conservation program at Bonneville Power Administration (BPA) is described at the conference. An overview of the program is presented. Topics covered in panel discussions include: how utilities can work effectively with weatherization contractors, homebuilders, energy auditors, and weatherization material suppliers; mechanisms for implementing conservation programs in the commercial sector; experiences gained in existing residential weatherization programs; and streamlining relationships between consumers, utilities, and BPA in providing services and getting feedback. The planning, programming, technical assistance, and engineering thrusts of BPA's conservation programs are discussed. Indoor air quality, renewable energy, and the regulator's role in relationships to energy conservation are discussed. Passive solar programs, DOE initiatives in solar and conservation for buildings, conservation potential in the commercial and industrial sectors, and current conservation research and development are also discussed. (MCW)

  4. 1992 Resource Program, 10 Year Plan : Draft II.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  5. Significance of Selective Predation and Development of Prey Protection Measures for Juvenile Salmonids in the Columbia and Snake River Reservoirs: Annual Progress Report, February 1991-February 1992.

    Energy Technology Data Exchange (ETDEWEB)

    Poe, Thomas P.

    1992-12-31

    This document is the 1991 annual report of progress for the Bonneville Power Administration (BPA) research Project conducted by the US Fish and Wildlife Service (FWS). Our approach was to present the progress achieved during 1991 in a series of separate reports for each major project task. Each report is prepared in the format of a scientific paper and is able to stand alone, whatever the state of progress or completion. This project has two major goals. One is to understand the significance of selective predation and prey vulnerability by determining if substandard juvenile salmonids (dead, injured, stressed, diseased, or naive) are more vulnerable to predation by northern squawfish, than standard or normal juvenile salmonids. The second goal is to develop and test prey protection measures to control predation on juvenile salmonids by reducing predator-smolt encounters or predator capture efficiency.

  6. Evidence of deepwater spawning of fall chinook salmon (Oncorhynchus tshawytscha): spawning near Ives and Pierce Island of the Columbia River, 1999; ANNUAL

    International Nuclear Information System (INIS)

    Mueller, Robert P.; Dauble, Dennis D.

    2000-01-01

    Fall chinook salmon Oncorhynchus tshawytscha, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by Washington Department of Fisheries and Wildlife (WDFW) biologists in 1993 (Hymer 1997). Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and Ives island. Limited spawning ground surveys were conducted in the area around Ives and Pierce Islands during 1994-1997 and based on these surveys it was believed that fall chinook salmon successfully spawned in this area. The size of this population from 1994 to 1996 was estimated at 1,800 to 5,200 fish (Hymer 1997). Recently, chum salmon were also documented spawning downstream of Bonneville Dam. Chum salmon O. kisutch were listed as threatened under the Endangered Species Act (ESA) in March, 1999. There are several ongoing investigations to define the physical habitat characteristics associated with fall chinook and chum salmon spawning areas downstream of Bonneville Dam. A major concern is to determine what flows (i.e. surface elevations) are necessary to ensure their long-term survival. Our objective was to locate deepwater spawning locations in the main Columbia River channel and to collect additional data on physical habitat parameters at the site. This objective is consistent with the high priority that the Northwest Power Planning Council's Independent Advisory Board and the salmon managers have placed on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin

  7. Status and habitat requirements of the white sturgeon populations in the Columbia River downstream from McNary Dam

    International Nuclear Information System (INIS)

    Nigro, A.A.

    1991-09-01

    We report on our progress from April 1990 through March 1991 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from NcNary Dam; to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam; to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams; and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights of results of this work in the Dalles, Bonneville and John Day reservoirs are included in the four pages included in this report

  8. The Europeanization of Public Administration through the General Principles of Good Administration

    Directory of Open Access Journals (Sweden)

    Vasilica NEGRUŢ

    2011-08-01

    Full Text Available The general objective of the paper is based on an extremely present theme of real interest. Using the content analysis, through a descriptive documentary research, the present study aims at identifying the dimensions of the general principles of good administration, in the context of changes at European an implicitly at national level. To this purpose, an analisys of the specific objectives will be made: the concept of good administration, the national dimensions of the right to be heard, the right to access personal files as well as the motivation of administrative acts and the general principles regulated by the European Code of Good Administration will be underlined, in the context of institutional change determined by the Lisbon Treaty. Good administration defines the way in which institutions function, this being possible by ensuring the right to access information, a more efficient protection of fundamental rights as well as the right to defense, publication of acts and their motivation. Good administration is strongly connected to good government, the relation being in our opinion, from part to whole. The final purpose of good government and implicitly of good administration aims at accomplishing the general interest. The two concepts need a higher degree of transparency and responsibility in the public process. If governing represents the modality of exerting power, good government entails the imperative of the consensus of those governed regarding the objectives and methods of government, the responsibility of those governing, the efficiency of governing and the citizens’ right to be informed regarding the use and the distribution of the financial resources in the governing process. This new concept takes into account the implication of the citizens in the decision - making process, allowing a more efficient use of material, human, and financial resources. We assert thus that by applying the general principles of good administration

  9. Administrative jurisdiction of customs of Ukraine

    OpenAIRE

    DOROSH M.M.

    2012-01-01

    The author describes the customs authorities as subjects of administrative jurisdiction, serving a variety of executive power. The customs authorities of Ukraine in nature play an important role in the law enforcement activities of the state. There is a constant struggle against customs violations.

  10. 7. Administrative structures.

    Science.gov (United States)

    2014-05-01

    The basic systems of any society rarely can operate independently. Instead, they are dependent and often interdependent upon other entities. Such entities control the resources within their respective systems. Thus, coordination and control agencies require contracts or memoranda of understanding with these entities in order to assure access to the resources required during a crisis. These administrative structures include: (1) governmental institutions and agencies, including the military; (2) intergovernmental organisations; (3) nongovernmental organisations; (4) commercial private sector organisations; and (5) academic institutions. These dependencies create potential barriers to the provision of coordination and control including: (1) the complexity of the administrative structures with which coordination and control must interact; (2) the location of resources; (3) finding responsible person(s); (4) the competence and compatibility; (5) methods of access; (6) payment; (7) contracts and memoranda of understanding; (8) inventories of accessible resources; (9) competition for the mandate, power, and resources; and (10) jealousy. The need for potential interactions between administrative structures requires that agreements for the sharing of resources during crises be reached as part of planning and preparedness. Gaining an understanding of these relationships is an important area for research.

  11. Income distribution impacts of changes in Western Area Power Administration electricity prices. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Rose, A.; Frias, O. [Pennsylvania State Univ., University Park, PA (United States). Dept. of Mineral Economics

    1993-06-01

    The purpose of this report is to present the methodology and results of an analysis of income distribution impacts associated with changes in the Western Area Power Administration (WAPA) marketing program. The focus will be on the distribution of personal income across eleven brackets in each of nine sub-regions of the WAPA market area. Moreover, these results will be translated into an assessment of the number of people who stand to gain or lose as a result of the policies and the size of these income changes. Most economic impact analyses are performed at an aggregate level. The results are typically presented in terms of net benefits, or a listing of changes in employment, output, income, or prices. What is neglected is the distribution of impacts across the affected population. These distributional impacts are important for several reasons. First, there is the normative judgmental issue of distributional justice, or equity. This addresses concerns about income disparities in general, or whether the poor, or any other group, are shouldering a disproportionate share of any burden or are failing to share significantly in any gain.

  12. Administration in an operating plant

    International Nuclear Information System (INIS)

    Staebler, K.

    1977-01-01

    The importance of strict administrative procedures in the daily work is being demonstrated by commenting on events that occured in the operation of German nuclear power plants. The procedure for working in an area of the plant (pressurized medium, high-radioactive level, explosive of flammable mediums), where special measures for safe working have to be taken, is discussed in detail. The administrative problems during refuelling time are further on mentioned, especially the problems connected with administering more than 1,000 people with respect to health protection and sabotage protection. Some general comments on the influences from external causes (authorities, courts, etc.) are given. (orig./ORU) [de

  13. Revised Environmental Assessment for the Sacramento Area Office Western Area Power Administration, 1994 Power Marketing Plan

    International Nuclear Information System (INIS)

    1992-08-01

    This document presents information on power marketing; expiring contracts; economic methods and assumptions; detailed power supply cost data; guidelines and acceptance criteria for conservation and renewable energy projects; hourly flow impacts graphs; difference in hydro dispatch; generation data; flow data; fishery resources of the Sacramento River; and water quality

  14. Columbia River: Terminal fisheries research project. 1994 Annual report

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, P.; Miller, M.; Hill, J.

    1996-12-01

    Columbia River terminal fisheries have been conducted in Youngs Bay, Oregon, since the early 1960`s targeting coho salmon produced at the state facility on the North Fork Klaskanine River. In 1977 the Clatsop County Economic Development Council`s (CEDC) Fisheries Project began augmenting the Oregon Department of Fish and Wildlife production efforts. Together ODFW and CEDC smolt releases totaled 5,060,000 coho and 411,300 spring chinook in 1993 with most of the releases from the net pen acclimation program. During 1980-82 fall commercial terminal fisheries were conducted adjacent to the mouth of Big Creek in Oregon. All past terminal fisheries were successful in harvesting surplus hatchery fish with minimal impact on nonlocal weak stocks. In 1993 the Northwest Power Planning Council recommended in its` Strategy for Salmon that terminal fishing sites be identified and developed. The Council called on the Bonneville Power Administration to fund a 10-year study to investigate the feasibility of creating and expanding terminal known stock fisheries in the Columbia River Basin. The findings of the initial year of the study are included in this report. The geographic area considered for study extends from Bonneville Dam to the river mouth. The initial year`s work is the beginning of a 2-year research stage to investigate potential sites, salmon stocks, and methodologies; a second 3-year stage will focus on expansion in Youngs Bay and experimental releases into sites with greatest potential; and a final 5-year phase establishing programs at full capacity at all acceptable sites. After ranking all possible sites using five harvest and five rearing criteria, four sites in Oregon (Tongue Point, Blind Slough, Clifton Channel and Wallace Slough) and three in Washington (Deep River, Steamboat Slough and Cathlamet Channel) were chosen for study.

  15. Evaluation of utility residential energy conservation programs: A Pacific Northwest example

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E; Bronfman, B; Goeltz, R; Keating, K; Lerman, D; Timble, J

    1984-03-01

    This paper describes a detailed quantitative evaluation of the Residential Weatherization Pilot Program, operated by the Bonneville Power Administration from 1980 through 1982. The program provided free energy audits to more than 6000 electrically-heated homes and gave zero-interest loans to weatherize almost 4000 of these audited homes. The total cost of the program was almost $8 million. Using actual electricity consumption records for program participants and nonparticipants, we calculated the energy-saving effect of the pilot program in several ways and always reached the same conclusion. Households that received an audit and weatherization loan reduced their annual electricity consumption by about 3500 kWh relative to what they would have done without the program; this 3500 kWh is the saving that can be directly attributed to the program. Using a simple net present worth approach, the authors computed program benefits and costs for participating households, the BPA power system, and the Pacific Northwest region as a whole. Under a wide range of assumptions concerning discount rate, years until the weatherization loan is repaid, program energy saving, and BPA's marginal cost of power, the program is economically attractive from all three perspectives.

  16. Status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam, annual progress report, July 1986 - March 1987.; ANNUAL

    International Nuclear Information System (INIS)

    Oregon Department of Fish and Wildlife; Washington Department of Fisheries

    1987-01-01

    Measure 804(e)(8) of the Northwest Power Planning Council (NPPC) Fish and Wildlife Program states that Bonneville Power Administration (BPA) ''shall fund research to determine the impacts of development and operation of the hydroelectric power system on sturgeon in the Columbia River Basin...'' In June 1985, BPA sponsored a workshop to define and list in priority order research needs in the basin (Fickeisen 1985a). In December 1985, BPA submitted a research program implementation plan (Fickeisen 1985b) to the NPPC. The purpose of the plan is to provide guidance for conducting research necessary to address four objectives identified by regional fishery interests for protecting, mitigating and enhancing white sturgeon populations in the Columbia River basin. The plan's objectives are: (1) Assess the current status of Columbia River basin white sturgeon stocks. (2) Provide the basis to evaluate the need for protection, mitigation and enhancement of white sturgeon in the Columbia River system. (3) Provide information that can be used to evaluate potential methods of protection, mitigation and enhancement of existing stocks. (4) Provide tools to assess the effectiveness of protection, mitigation and enhancement efforts

  17. Idaho Habitat/Natural Production Monitoring, Pt. I: General Monitoring Subproject : Annual Progress Report 1990.

    Energy Technology Data Exchange (ETDEWEB)

    Rich, Bruce A.; Scully, Richard J.; Petrosky, Charles Edward

    1992-01-01

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss, hereafter called steelhead, and chinook salmon O. tshawytscha, hereafter called chinook, in the Clearwater and Salmon River drainages for the past seven years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. This evaluation project is also funded under the same authority (Fish and Wildlife Program, Northwest Power Planning Council). A mitigation record is being developed using increased carrying capacity and/or survival as the best measure of benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.

  18. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1986-1987 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McCabe, Jr., George T. (National Marine Fisheries Service, Environmental and Technical Services Division, Portland, OR); Beckman, Lance G. (US Fish and Wildlife Service, Portland, OR); Kreitman, Gayle (Washington Department of Fisheries, Olympia, WA)

    1987-06-01

    Measure 804(e)(8) of the Northwest Power Planning Council (NPPC) Fish and Wildlife Program states that Bonneville Power Administration (BPA) ''shall fund research to determine the impacts of development and operation of the hydroelectric power system on sturgeon in the Columbia River Basin...'' In June 1985, BPA sponsored a workshop to define and list in priority order research needs in the basin (Fickeisen 1985a). In December 1985, BPA submitted a research program implementation plan (Fickeisen 1985b) to the NPPC. The purpose of the plan is to provide guidance for conducting research necessary to address four objectives identified by regional fishery interests for protecting, mitigating and enhancing white sturgeon populations in the Columbia River basin. The plan's objectives are: (1) Assess the current status of Columbia River basin white sturgeon stocks. (2) Provide the basis to evaluate the need for protection, mitigation and enhancement of white sturgeon in the Columbia River system. (3) Provide information that can be used to evaluate potential methods of protection, mitigation and enhancement of existing stocks. (4) Provide tools to assess the effectiveness of protection, mitigation and enhancement efforts.

  19. Economic impacts of geothermal development in Malheur County, Oregon

    International Nuclear Information System (INIS)

    Sifford, A.; Beale, K.

    1993-01-01

    This study provides local economic impact estimates for a 100 megawatt (MW) geothermal power project in Oregon. The hypothetical project would be in Malheur County, shown in Figure 1. Bonneville Power Administration commissioned this study to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council and its advisors. Malheur County was chosen as it has both identified resources and industry interest. Local economic impacts include direct, indirect, and induced changes in the local economy. Direct economic impacts result from the costs of plant development, construction, and operation. Indirect impacts result from household and local government purchases. Induced impacts result from continued responding as goods and services to support the households and local governments are purchased. Employment impacts of geothermal development follow a pattern similar to the economic impacts. Public service impacts include costs such as education, fire protection, roads, waste disposal, and water supply. The project assumption discussion notes experiences at other geothermal areas. The background section compares geothermal with conventional power plants. Power plant fuel distinguishes geothermal from other power sources. Other aspects of development are similar to small scale conventional thermal sources. The process of geothermal development is then explained. Development consists of well drilling, gathering system construction, power plant construction, plant operation and maintenance, and wellfield maintenance

  20. Legal principles of regulatory administration and nuclear safety regulation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kyeong Hui; Cheong, Sang Kee [Hannam Univ., Taejon (Korea, Republic of)

    2000-12-15

    This research presents a critical analysis and evaluation of principles of administrative laws in order to provide framework of structural reform on the nuclear safety regulation system. The focus of this analysis and evaluation is centered around the area of origin of regulatory administrative laws; authorities of regulation; procedures of regulatory actions; regulatory enforcement; and administrative relief system. In chapter 2 the concept of regulatory administration is analysed. Chapter 3 identifies the origin of regulatory administration and the principles of administration laws. It also examines legal nature of the nuclear safety standard. In relation to regulatory authorities. Chapter 4 identifies role and responsibility of administration authorities and institutions. It also examines fundamental principles of delegation of power. Then the chapter discusses the nuclear safety regulation authorities and their roles and responsibilities. Chapter 5 classifies and examines regulatory administration actions. Chapter 6 evaluates enforcement measure for effectiveness of regulation. Finally, chapter 7 discusses the administrative relief system for reviewing unreasonable regulatory acts.

  1. Proposed Columbia Wind Farm number-sign 1. Joint NEPA/SEPA draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm number-sign 1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue

  2. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat County (Wash.)

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

  3. Indoor temperature changes after retrofit: inferences based on electricity billing data for nonparticipants and participants in the BPA Residential Weatherization Program

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; White, D.

    1985-07-01

    This report discusses changes in indoor temperatures in response to retrofit improvements. The data on which this analysis is based are from an evaluation of the Bonneville Power Administration (BPA) interim Residential Weatherization Program. The BPA program, operated through participating private and public utilities throughout the Pacific Northwest, offered financial assistance (generally a cash rebate) to encourage installation of energy-efficiency improvements to existing homes in the region. These retrofits included attic, wall, floor and heating duct insulation; storm windows and doors; clock thermostats; and caulking and weatherstripping. This program, which operated during 1982 and 1983, weatherized 104 thousand homes at a total cost to BPA of $157 million. In mid-1983, staff at Oak Ridge National Laboratory and Evaluation Research Corporation began an evaluation of the BPA program. The primary focus of this evaluation was assessment of the actual electricity saving that can be attributed to the program (Hirst, et al., 1985). These savings estimates were used to help assess the economic attractiveness of the program to participants, the BPA power system, and the Pacific Northwest region as a whole.

  4. Dynamics of participation and supply of services in the Hood River Conservation Project

    Energy Technology Data Exchange (ETDEWEB)

    Hirst, E.; Goeltz, R.

    1986-07-01

    The Hood River Conservation Project (HRCP) is a major residential retrofit demonstration project. HRCP is funded by the Bonneville Power Administration (BPA) and run by Pacific Power and Light Company. The project was conducted in the community of Hood River, Oregon, will cost $21 million, and will last for three years (mid-1983 through 1986). Installation of applicable retrofit measures was completed by the end of 1985; data collection, analysis, and report writing will continue through 1986. This report documents the extent to which households participated in HRCP. Differences between participants and eligible nonparticipants are examined. Similarly, differences among participants as a function of when they signed up for HRCP are analyzed. The report also examines the dynamics of program services (i.e., times between audit requests and audit, and between audit and installation of measures). These analyses are based on data from the roughly 3500 Hood River homes eligible for HRCP, 3189 of which received free home energy audits and 2988 of which received HRCP-financed retrofit measures.

  5. Restoring Anadromous Fish Habitat in the Lapwai Creek Watershed, Technical Report 2003-2006.

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Lynn

    2007-02-01

    The Restoring Anadromous Fish Habitat in the Lapwai Creek Watershed is a multi-phase project to enhance steelhead trout in the Lapwai Creek watershed by improving salmonid spawning and rearing habitat. Habitat is limited by extreme high runoff events, low summer flows, high water temperatures, poor instream cover, spawning gravel siltation, and sediment, nutrient and bacteria loading. Funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council's Fish and Wildlife Program, the project assists in mitigating damage to steelhead runs caused by the Columbia River hydroelectric dams. The project is sponsored by the Nez Perce Soil and Water Conservation District (District). Target fish species include steelhead trout (Oncorhynchus mykiss). Steelhead trout within the Snake River Basin were listed in 1997 as threatened under the Endangered Species Act. Accomplishments for the contract period December 1, 2003 through February 28, 2004 include; seven grade stabilization structures, 0.67 acres of wetland plantings, ten acres tree planting, 500 linear feet streambank erosion control, two acres grass seeding, and 120 acres weed control.

  6. Daily/Hourly Hydrosystem Operation : How the Columbia River System Responds to Short-Term Needs.

    Energy Technology Data Exchange (ETDEWEB)

    Columbia River System Operation Review (U.S.)

    1994-02-01

    The System Operation Review, being conducted by the Bonneville Power Administration, the US Army Corps of Engineers, and the US Bureau of Reclamation, is analyzing current and potential future operations of the Columbia River System. One goal of the System Operations Review is to develop a new System Operation Strategy. The strategy will be designed to balance the many regionally and nationally important uses of the Columbia River system. Short-term operations address the dynamics that affect the Northwest hydro system and its multiple uses. Demands for electrical power and natural streamflows change constantly and thus are not precisely predictable. Other uses of the hydro system have constantly changing needs, too, many of which can interfere with other uses. Project operators must address various river needs, physical limitations, weather, and streamflow conditions while maintaining the stability of the electric system and keeping your lights on. It takes staffing around the clock to manage the hour-to-hour changes that occur and the challenges that face project operators all the time.

  7. Ethics, a neglected dimension of power relationships of physician leaders.

    Science.gov (United States)

    Chervenak, Frank A; McCullough, Laurence B; Baril, Thomas E

    2006-09-01

    Physician leaders in obstetrics and gynecology find themselves in complex power relationships with administrative subordinates, administrative peers, and administrative superiors. The ethical dimensions of these power relationships have not been examined previously. The authors draw on the work of 3 major historic figures (John Gregory, Thomas Hobbes, and Friedrich Hoffmann) to identify for the first time 3 major types of power relationships and organizational cultures. Gregorian power relationships and organizational cultures are characterized by shared fiduciary responsibility that advances the core mission of a health care organization. Hobbesian power relationships and organizational cultures are characterized by relentless self-interest in a zero-sum game. Hoffmannian power relationships and organizational cultures are characterized by enlightened self-interest in a win-win game. The authors analyze the ethical dimensions of power relationships of physician leaders with subordinates, peers, and superiors and of organizational cultures. The authors support transformational leadership toward Gregorian power relationships and organizational cultures, using, when necessary, Hoffmannian power relationships and organizational cultures as a way station.

  8. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J. [Pacific Northwest Lab., Richland, WA (United States); Roybal, A.L. [Western Area Power Administration, Golden, CO (United States)

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  9. Superior Administrative Court Baden-Wuerttemberg. Judgement of March 30, 1982 (Wyhl)

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Presentation and discussion of the leading statements of the decision delivered by the Mannheim Superior Administrative Court on March 30, 1982 concerning the Wyhl nuclear power plant, unit 1. With this decision, covering 548 pages, the Superior Administrative Court changed the decision of the Freiburg Administrative Court of the year 1977 and finally dismissed the action for annulment of the construction licence. The Superior Administrative Court acted upon the appeal brought in by the Land and the plant operator, Kernkraftwerksgesellschaft. (CB) [de

  10. Electric power industry in China

    Energy Technology Data Exchange (ETDEWEB)

    Zisheng Jiang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents the status of the electric power in China, highlighting the following aspects: recent achievement, electricity increased sharing in the total energy consumption, technical economic indexes, nuclear power, renewable energy sources, rural electrification, transmission and power network, transmission lines and substations, present status and development trends for power network, regulation of power system dispatching, power system communication. The document also presents the future developing plan, approaching the outlook and strategy, development targets of the electric power industry and the administrative system reforming of the electric power industry.

  11. 49 CFR 234.251 - Standby power.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Standby power. 234.251 Section 234.251 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION..., Inspection, and Testing Inspections and Tests § 234.251 Standby power. Standby power shall be tested at least...

  12. Nuclear supervision - Administration by the federal states on behalf of the Federal Government or direct federal administration? Evaluation from a practical point of view

    International Nuclear Information System (INIS)

    Cloosters, W.

    2005-01-01

    The organization of supervisory authorities under the Atomic Energy Act is not a new issue. In fact, it was discussed vehemently in the Federal Republic of Germany as far back as in the early fifties. Federal legislation in late 1959 decided to have the Atomic Energy Act executed in part under direct federal responsibility and, as far as the important supervision of the nuclear power plants operated in the Federal Republic of Germany was concerned, by the federal states on behalf of the federal government. Federal Minister for the Environment Trittin reopened the debate about the organization of nuclear administration by announcing his intention to transfer the supervision of nuclear power plants to direct federal administration. This announcement not only raises the question of legal permissibility of transferring nuclear power plant oversight to federal administration, but also requires a critical review, as presented in this article, of practical regulatory supervision to ensure safe operation of nuclear facilities. In this connection, both the actual content of supervisory activities and the way in which they are carried out must be examined in an effort to find an answer based on solid premises to the question raised above. For reasons explained in the contribution, oversight of nuclear power plants cannot be carried out as a centralized function. Instead, the legislative decision of 1959 in favor of the federal states exercising supervision on behalf of the federal government continues to be correct at the present stage also in the light of the steps initiated to opt out of the peaceful uses of nuclear power. (orig.)

  13. Economical Radioisotope Power

    Data.gov (United States)

    National Aeronautics and Space Administration — Almost all robotic space exploration missions and all Apollo missions to the moon used Radioisotopic Thermoelectric Generators (RTGs) to provide electrical power to...

  14. 40 CFR 164.40 - Qualifications and duties of Administrative Law Judge.

    Science.gov (United States)

    2010-07-01

    ... Administrative Law Judge. 164.40 Section 164.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Judicial Ethics of the American Bar Association. (d) Power. Subject to review, as provided elsewhere in... Law Judge, the Administrator or the Environmental Appeals Board. [38 FR 19371, July 20, 1973, as...

  15. Status and Habitat Requirements of White Sturgeon Populations in the Columbia River Downstream from McNary Dam, 1989-1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nigro, Anthony A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1990-09-01

    We report on our progress from April 1989 through March 1990 on determining the status and habitat requirements of white sturgeon populations in the Columbia River downstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW), Washington Department of Fisheries (WDF), US Fish and Wildlife Service (FWS) and National Marine Fisheries Service (NMFS). Study objectives addressed by each agency are to describe the life history and population dynamics of subadults and adults between Bonneville and McNary dams and evaluate the need and identify potential methods for protecting, mitigating and enhancing populations downstream from McNary Dam, to describe the white sturgeon recreational fishery between Bonneville and McNary dams, describe reproductive and early life history characteristics downstream from Bonneville Dam and describe life history and population dynamics of subadults and adults downstream from Bonneville Dam, to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available between Bonneville and McNary dams, and to describe reproduction and early life history characteristics, define habitat requirements for spawning and rearing and quantify extent of habitat available downstream from Bonneville Dam. Our approach is to work concurrently downstream and upstream from Bonneville Dam. Upstream from Bonneville Dam we began work in the Dalles Reservoir in 1987 and expanded efforts to Bonneville Reservoir in 1988 and John Day Reservoir in 1989. Highlights from this work is also included. 47 refs., 33 figs., 66 tabs.

  16. The electric power sector in Iceland

    International Nuclear Information System (INIS)

    Ingimarsson, J.

    1992-01-01

    In Iceland the government must give permission for the building of a power station etc. but in practise the power plant administrators determine the tariffs. The structure of electric power supply mirrors a strong engagement on the part of the state and the local authorities. Almost all the power plants and distribution systems are state owned or owned by both the state and the local authorities, and so constitute a monopoly, producing 93% of the total amount of electricity supply. Government policy in this field, the Icelandic electric power distribution system and the setting of electricity prices are briefly described. It is claimed that there would be economical advantages in restructuring the distribution network and that the government favours an increase in possibilities for competition and making legislative changes. This will mean that in the future the market will play a more important role and that power plant administrators must review their duties regarding consumer satisfaction, tariffs etc. (AB)

  17. The Concept of Appropriateness in Issuing Administrative Acts

    Directory of Open Access Journals (Sweden)

    Iulian Nedelcu

    2011-05-01

    Full Text Available Administrative acts are a legal way of organizing the execution and enforcement of the law. Law can not and should not establish all cases and all the ways, by means of which public administration bodies interfere with administrative actions, therefore administrative public bodies must have some initiative and ought to be able to assess the situations in which they will issue these acts and to appreciate their appropriateness. The appropriateness principle of administrative acts must be correlated with the legality principle. It can be concluded that the appropriateness principle underscores the power conferred by public administration, permitted in accordance with which it has the right and duty to judge when issuing an administrative compliance of the state of lawand facts, an appreciation that public administration is based on a single criterion: the interests of the community that they represent. Also, the very organization of the state as a state of law leads to the conclusion that the law – which is the materialization of the idea of justice – should be the standard on which the activity of human individuals report both to the quality of beneficiaries of the provisions and benefits of public administration and on the other hand as officials, public servants or ordinary employees in public administration system.

  18. High Power Radiation Tolerant CubeSat Power System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — No vendor has yet to provide a radiation tolerant, high efficiency, small Power Management and Distribution module for the SmallSat and CubeSat market yet. Let alone...

  19. 76 FR 48159 - Integrated System Power Rates

    Science.gov (United States)

    2011-08-08

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Integrated System Power Rates AGENCY... American Electric Reliability Corporation and to cover increased investments and replacements in..., prepared a Current Power Repayment Study using existing system rates. The Study indicates that Southwestern...

  20. Columbia River System Operation Review final environmental impact statement. Appendix E: Flood control

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The Corps of Engineers, Bonneville Power Administration, and Bureau of Reclamation conducted a scoping process consisting of a series of regionwide public meetings and solicitation of written comments in the summer of 1990. Comments on flood control issues were received from all parts of the Columbia river basin. This appendix includes issues raised in the public scoping process, as well as those brought for consideration by members of the Flood Control Work Group

  1. Augmented fish health monitoring

    International Nuclear Information System (INIS)

    Michak, P.; Rogers, R.; Amos, K.

    1991-05-01

    The Bonneville Power Administration (BPA) initiated the Augmented Fish Health Monitoring project in 1986. This project was a five year interagency project involving fish rearing agencies in the Columbia Basin. Historically, all agencies involved with fish health in the Columbia Basin were conducting various levels of fish health monitoring, pathogen screening and collection. The goals of this project were; to identify, develop and implement a standardized level of fish health methodologies, develop a common data collection and reporting format in the area of artificial production, evaluate and monitor water quality, improve communications between agencies and provide annual evaluation of fish health information for production of healthier smolts. This completion report will contain a project evaluation, review of the goals of the project, evaluation of the specific fish health analyses, an overview of highlights of the project and concluding remarks. 8 refs., 1 fig., 4 tabs

  2. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  3. MonitoringResources.org—Supporting coordinated and cost-effective natural resource monitoring across organizations

    Science.gov (United States)

    Bayer, Jennifer M.; Scully, Rebecca A.; Weltzin, Jake F.

    2018-05-21

    Natural resource managers who oversee the Nation’s resources require data to support informed decision-making at a variety of spatial and temporal scales that often cross typical jurisdictional boundaries such as states, agency regions, and watersheds. These data come from multiple agencies, programs, and sources, often with their own methods and standards for data collection and organization. Coordinating standards and methods is often prohibitively time-intensive and expensive. MonitoringResources.org offers a suite of tools and resources that support coordination of monitoring efforts, cost-effective planning, and sharing of knowledge among organizations. The website was developed by the Pacific Northwest Aquatic Monitoring Partnership—a collaboration of Federal, state, tribal, local, and private monitoring programs—and the U.S. Geological Survey (USGS), with funding from the Bonneville Power Administration and USGS. It is a key component of a coordinated monitoring and information network.

  4. Multi-Scale Action Effectiveness Research in the Lower Columbia River and Estuary, 2011 - FINAL ANNUAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Sather, Nichole K.; Storch, Adam; Johnson, Gary E.; Teel, D. J.; Skalski, J. R.; Bryson, Amanda J.; Kaufmann, Ronald M.; Woodruff, Dana L.; Blaine, Jennifer; Kuligowski, D. R.; Kropp, Roy K.; Dawley, Earl M.

    2012-05-31

    The study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL), the Oregon Department of Fish and Wildlife (ODFW), the University of Washington (UW), and the National Marine Fisheries Service (NMFS) for the U.S. Army Corps of Engineers, Portland District (USACE). This research project was initiated in 2007 by the Bonneville Power Administration to investigate critical uncertainties regarding juvenile salmon ecology in shallow tidal freshwater habitats of the lower Columbia River. However, as part of the Washington Memorandum of Agreement, the project was transferred to the USACE in 2010. In transferring from BPA to the USACE, the focus of the tidal freshwater research project shifted from fundamental ecology toward the effectiveness of restoration in the Lower Columbia River and estuary (LCRE). The research is conducted within the Action Agencies Columbia Estuary Ecosystem Restoration Program (CEERP). Data reported herein spans the time period May 2010 to September 2011.

  5. Study of Disease and Physiology in the 1979 Homing Study Hatchery Stocks: A Supplement to "Imprinting Salmon and Steelhead Trout for Homing", 1979 by Slatick, Gilbreath, and Walch.

    Energy Technology Data Exchange (ETDEWEB)

    Novotny, Anthony J.; Zaugg, Waldo S.

    1981-09-01

    The National Marine Fisheries Service (NMFS), under contract to the Bonneville Power Administration, is conducting research on imprinting salmon and steelhead for homing (Slatick et al. 1979, 1980; Novotny and Zaugg 1979). The studies were begun with little background knowledge of the effects of disease or certain physiological functions on imprinting and homing in salmonids. Consequently, work aimed at filling this void was begun by the authors in 1978 (Novotny and Zaugg 1979) and continued in 1979. In 1979, we examined random samples of normal populations of homing test fish at the hatcheries to determine the physiological readiness to migrate and adapt to seawater and general fish health. At the Manchester Marine Experimental Station, Manchester, Washington, we determined the survival of samples of the test fish maintained in marine net-pens after release from the hatcheries. Hatcheries and stocks sampled are listed in Table 1.

  6. Geothermal Program Review XI: proceedings. Geothermal Energy - The Environmental Responsible Energy Technology for the Nineties

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    These proceedings contain papers pertaining to current research and development of geothermal energy in the USA. The seven sections of the document are: Overview, The Geysers, Exploration and Reservoir Characterization, Drilling, Energy Conversion, Advanced Systems, and Potpourri. The Overview presents current DOE energy policy and industry perspectives. Reservoir studies, injection, and seismic monitoring are reported for the geysers geothermal field. Aspects of geology, geochemistry and models of geothermal exploration are described. The Drilling section contains information on lost circulation, memory logging tools, and slim-hole drilling. Topics considered in energy conversion are efforts at NREL, condensation on turbines and geothermal materials. Advanced Systems include hot dry rock studies and Fenton Hill flow testing. The Potpourri section concludes the proceedings with reports on low-temperature resources, market analysis, brines, waste treatment biotechnology, and Bonneville Power Administration activities. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  7. Lower Red River Meadow Stream Restoration Project

    International Nuclear Information System (INIS)

    1996-05-01

    As part of a continuing effort to restore anadromous fish populations in the South Fork Clearwater River basin of Idaho, Bonneville Power Administration (BPA) proposes to fund the Lower Red River Meadow Restoration Project (Project). The Project is a cooperative effort with the Idaho Soil and Water Conservation District, Nez Perce National Forest, Idaho Department of Fish and Game (IDFG), and the Nez Perce Tribe of Idaho. The proposed action would allow the sponsors to perform stream bank stabilization, aquatic and riparian habitat improvement activities on IDFG's Red River Management Area and to secure long-term conservation contracts or agreements for conducting streambank and habitat improvement activities with participating private landowners located in the Idaho County, Idaho, study area. This preliminary Environmental Assessment (EA) examines the potential environmental effects of stabilizing the stream channel, restoring juvenile fish rearing habitat and reestablishing a riparian shrub community along the stream

  8. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  9. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  10. New Whole-House Solutions Case Study: Northwest Energy Efficient Manufactured Housing Program High-Performance Test Homes - Pacific Northwest

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-05-01

    This project represents the third phase of a multi-year effort to develop and bring to market a High Performance Manufactured Home (HPMH). In this project, the Northwest Energy Efficient Manufactured Housing Program worked with Building America Partnership for Improved Residential Construction and Bonneville Power Administration to help four factory homebuilders build prototype zero energy ready manufactured homes, resulting in what is expected to be a 30% savings relative to the Building America Benchmark. (The actual % savings varies depending on choice of heating equipment and climate zone). Previous phases of this project created a HPMH specification and prototyped individual measures from the package to obtain engineering approvals and develop preliminary factory construction processes. This case study describes the project team's work during 2014 to build prototype homes to the HPMH specifications and to monitor the homes for energy performance and durability. Monitoring is expected to continue into 2016.

  11. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  12. Cubesat SEP Power Module, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Today's CubeSats are inherently power limited due to their small size and available surface area. Today's CubeSats offer <100W of available power. This limits...

  13. 25 years of nuclear power

    International Nuclear Information System (INIS)

    Pocock, R.F.

    1984-01-01

    The paper lists some of the notable events of the British nuclear power industry during the past 25 years. The list includes achievements in nuclear power station technology, administrative reorganisation and public concern about the industry's impact on the environment. (U.K.)

  14. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  15. THE ADMINISTRATIVE JUSTICE IN SPAIN: CURRENT SITUATION AND CHALLENGES

    Directory of Open Access Journals (Sweden)

    R.J. Sánchez

    2016-01-01

    Full Text Available Since the Spanish Constitution of 1978 there has been a full and effective administrative justice. The citizens have the possibility to request a judicial review of decisions taken by the public Administrations, while being either the owners of a subjective right or of a legitimate interest. The interim judicial protection is not limited to the suppression of the act or general provision and the Courts are invested with direct powers to enforce their sentences. However, different problematic issues about the inactivity of the public Administrations and the enforcement of sentences are the new challenges to ensure the administrative justice. To this it must be added that there are problems regarding the inefficient work of Courts.

  16. Administrative Procedure Act and mass procedures (illustrated by the nuclear licensing procedure)

    International Nuclear Information System (INIS)

    Naumann, R.

    1977-01-01

    The report deals with the administrative procedure law of 25.5.76 of the Fed. Government, esp. with its meaning for the administrative procedures for the permission for nuclear power plants, as fas ar so-called mass procedures are concerned. (UN) [de

  17. Peculiarities of activities of public administration subjects in the public finance

    Directory of Open Access Journals (Sweden)

    Світлана Миколаївна Клімова

    2017-12-01

    Full Text Available A comprehensive reform of public administration and public finances conducted in Ukraine to implement the Association Agreement between Ukraine and the EU requires a thorough research. Problems related to the functioning of public administration, investigated by V. Averyanov, M. Benio, T.Belozerskaya, S. Vitvitsky, D. Vlasenko, S. Gaiduchenko, N. Hnidyuk, O. Jafarova, A. Zelentsov, T. Karabin, T. Kolomoets. The subject of the study is public administration in the field of public finance. T. Karabin investigated the basic theory of public administration and singled out the following: 1 classical theory; 2 the theory of new public management; 3 the theory of public service. The wording of the "broad" and "narrow" understanding of public administration should be made taking into account that today the public administration in Ukraine in the narrow sense consists of: 1 the bodies of state executive power (the Cabinet of Ministers of Ukraine, central executive authorities, their territorial offices, local state administrations, etc.; 2 specialized public authorities (for example, the Accounting Chamber, the National Bank of Ukraine; 3 subjects of local self-government (village, settlement, city council, village, settlement, city mayor, executive bodies of village, settlement, city council, head of state, rayon and regional councils, representing common interests of territorial communities of villages, settlements, cities; organs of self-organization of the population . In the broad sense, non-state actors (both collective and individual should be included in the circle of subjects of the public administration of Ukraine, which delegates power and administrative powers, which are in continuous interaction with public authorities, performing the functions assigned to them. The complexity of public administration in our country is due to the variability of all elements of the system, the links between them and the environment in which the

  18. Water Power in The Wilderness: The History of Bonneville Lock and Dam

    Science.gov (United States)

    1997-01-01

    yards of material. Reinforced concrete cutoff walls at each abutment and reinforced concrete coun- terfort type upstream wing walls, along with...at the ends of the dam, the abutment Blasting of boulder no. 8 for navigation channel at Cascade Rapids . walls had to be built over 150 feet high...completion of the entire north section during 1936-37, the contractors placed a prefabricated struc- tural steel cofferdam over the crest section

  19. 2012 Annual Report [WESTERN AREA POWER ADMINISTRATION

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-01-01

    Fiscal Year 2012 brought some tumultuous and uncertain times to Western. The utility industry and technology continued to evolve, and the demand for constant flow of power and transmission system reliability continued to increase. Western kept pace by continuing to deliver reliable, cost-based hydropower while reviewing and updating business practices that took into account how the energy industry is evolving. During this time of exponential change, Western tackled many challenges, including: Reviewing the Transmission Infrastructure Program processes and procedures; Responding to Secretary of Energy Steven Chu’s memorandum to create a modern, efficient and reliable transmission grid; Weathering record-breaking natural disasters in our service territory; Completing our role in TIP’s flagship project—the Montana Alberta Tie Ltd. transmission line; Incorporating new, far-reaching regulations and industry trends.

  20. Everyday legitimacy and international administration: global governance and local legitimacy in Kosovo

    OpenAIRE

    Lemay-Hebert, Nicolas

    2012-01-01

    International administrations are a very specific form of statebuilding. This paper examines the limits illustrated by the experience in Kosovo. Here, the international administration faced the same requirements of any legitimate, Liberal government, but without the checks and balances normally associated with Liberal governance. Thus, the international administration was granted full authority and the power thereby associated, but without the legitimacy upon which the Liberal social contract...

  1. Reflections on the ‘Administrative, Not Constitutional’ Character of EU Law in Times of Crisis

    Directory of Open Access Journals (Sweden)

    Lindseth Peter L.

    2017-11-01

    Full Text Available As is broadly recognized, the realm of administrative power greatly expanded over the course the twentieth century (particularly after 1945. This essay argues that this expansion, along with differential conceptions of legitimacy deeply bound up with it, are crucial to understanding not just the modern administrative state but also the nature of EU governance and the law governing its operation. Despite a dominant paradigm that seeks to understand EU governance in autonomously democratic and constitutional terms, the legitimacy of integration as a whole has remained primarily ‘administrative, not constitutional’. The EU’s normative power, like all power of an ultimately administrative character, finds its legitimacy primarily in legal, technocratic and functional claims. This is not to deny that European integration involves ‘politics’ or has profound ‘constitutional’ implications for its member states or citizens. The ‘administrative, not constitutional’ paradigm is meant only to stress that the ultimate grounding of EU rulemaking, enforcement, and adjudication comes closer to the sort of administrative legitimacy that is mediated through national executives, national courts, and national parliaments to a much greater extent than the dominant paradigm supposes. This is the reality that the ‘administrative, not constitutional’ paradigm on EU law has always sought to emphasize, and it is one that is particularly pertinent to the integration process in times of crisis. It is unsurprising, in these circumstances, that the public law of European integration has continually resorted to mechanisms of nationally mediated legitimacy in order to ‘borrow’ legitimacy from the national level. Unless and until Europeans begin to experience democracy and constitutionalism in supranational terms, the ‘administrative, not constitutional’ paradigm suggests that the EU’s judicial doctrines must be adjusted. The purpose should be to

  2. The Efficiency and Public Transport Accessibility of Indirect State Administration in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Vrabková Iveta

    2016-06-01

    Full Text Available This paper examines the efficiency and public transport accessibility of indirect (devolved state administration performed by municipalities with extended powers (hereinafter MEPs in the Czech Republic. Our aim is to evaluate the efficiency of the revenues made by municipalities with extended powers, through performing powers delegated to them by the state administration, and those municipalities’ public transport accessibility as of 31 December, 2014. The rate of efficiency is tested on an output-oriented Free Disposable Hull model. One input variable is selected - the operating expenses of the municipal offices recalculated per inhabitant of the municipality’s administrative district - and two output variables are selected: contribution to the performance of state administration, recalculated per inhabitant of the municipality’s administrative district, and revenues from administrative fees per inhabitant of the municipality’s administrative district. The municipality’s offices’ transport accessibility is evaluated via network analysis using ArcGIS software. The article investigates the hypothesis that public administration deconcentration practices logically result in higher security costs and therefore inefficiency. The results reveal that only 66 of the country’s 205 MEPs are efficient and that operating expenses and state contributions for the performance of state administrative tasks play a significant role in these results. Efficiency is less significantly influenced by administrative fee revenues. Public transport accessibility is analyzed for two time intervals - 6:00 to 8:00 am and 1:00 to 2:00 pm - on Tuesdays. The degree of accessibility is defined using a six-point scale of accessibility. The results show that the best accessibility is in the morning hours, when the offices are accessible for 68.8% of the population aged 15+ in the Czech Republic; the worst accessibility is in the afternoon hours when only 2% of the

  3. Rights and obligations of communal enterprises under Polish administrative law

    International Nuclear Information System (INIS)

    Filipek, J.

    1992-01-01

    The paper elucidates the legal environment in which Polish power producing and distributing enterprises operate. In particular, the different forms of communal enterprises are described: public owned companies; public owned companies serving ''higher purposes''; communal enterprises operating on the strength of special laws; forms of organization subject to private law. Over the long term the rules in the sphere of the communal economy can be simplified. As the administrative judiciary develops, comprehensive administrative surveillance will become superfluous. The communal enterprises render their services to the citizen. The legal remedies at the citizen's disposal are the administrative complaint and the appeal to the administrative courts. (orig./HSCH) [de

  4. Wuergassen nuclear power plant

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The decision of the Federal Court of Administration concerns an application for immediate decommissioning of a nuclear power plant (Wuergassen reactor): The repeal of the permit granted. The decision dismisses the appeal for non-admission lodged by the plaintiffs against the ruling of the Higher Court of Administration (OVG) of North-Rhine Westphalia of December 19th 1988 (File no. 21 AK 8/88). As to the matter in dispute, the Federal Court of Administration confirms the opinion of the Higher Court of Administration. As to the headnotes, reference can be made to that decision. Federal Court of Administration, decision of April 5th 1989 - 7 B 47.89. Lower instance: OVG NW, Az.: 21 AK 8/88. (orig./RST) [de

  5. Probabilistic Fault Diagnosis in Electrical Power Systems

    Data.gov (United States)

    National Aeronautics and Space Administration — Electrical power systems play a critical role in spacecraft and aircraft. This paper discusses our development of a diagnostic capability for an electrical power...

  6. Corona performance of a compact 230-kV line

    International Nuclear Information System (INIS)

    Chartier, V.L.; Blair, D.E.

    1994-01-01

    Permitting requirements and the acquisition of new rights-of-way for transmission facilities has in recent years become increasingly difficult for most utilities, including Puget Sound Power and Light Company. In order to maintain a high degree of reliability of service while being responsive to public concerns regarding the siting of high voltage (HV) transmission facilities, Puget Power has found it necessary to more heavily rely upon the use of compact lines in franchise corridors. Compaction does, however, precipitant increased levels of audible noise (AN) and radio and TV interference (RI and TVI) due to corona on the conductors and insulator assemblies. Puget Power relies upon the Bonneville Power Administration (BPA) Corona and Field Effects computer program to calculate AN and RI for new lines. Since there was some question of the program's ability to accurately represent quiet 230-kV compact designs, a joint project was undertaken with BPA to verify the program's algorithms. Long-term measurements made on an operating Puget Power 230-kV compact line confirmed the accuracy of BPA's AN model; however, the RI measurements were much lower than predicted by the BPA computer and other programs. This paper also describes how the BPA computer program can be used to calculate the voltage needed to expose insulator assemblies to the correct electric field in single test setups in HV laboratories

  7. Design of radioisotope power systems facility

    International Nuclear Information System (INIS)

    Eschenbaum, R.C.; Wiemers, M.J.

    1991-01-01

    Radioisotope power systems currently produced for the U.S. Department of Energy Office of Special Applications by the Mound Laboratory at Miamisburg, Ohio, have been used in a variety of configurations by the Department of Defense and the National Aeronautics and Space Administration. A forecast of fugure radioisotope power systems requirements showed a need for an increased production rate beyond the capability of the existing Mound Laboratory. Westinghouse Hanford Company is modifying the Fuels and Materials Examination Facility on the Hanford Site near Richland, Washington, to install the new Radioisotope Power Systems Facility for assembling future radioisotope power systems. The facility is currently being prepared to assemble the radioisotope thermoelectric generators required by the National Aeronautics and Space Administration missions for Comet Rendezvous Asteroid Flyby in 1995 and Cassini, an investigation of Saturn and its moons, in 1996

  8. Development of nuclear power plant management system for Kyushu Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Nakamura, Kenichi; Akiyoshi, Tatsuo; Tanimoto, Kazuo; Ogura, Kazuhito; Ibi, Yuji; Kawasaki, Michiyuki

    2002-01-01

    The Kyushu Electric Power Co., Ltd. progresses development of the nuclear power plant management system using IT under aims at upgrading of efficiency, level, and reliability on maintenance and administration business under five years planning since 1999 fiscal year. The outline of the system are explained in this paper. As a result of preparation on power station net work and personal computers set in all of company, an environment capable of using these infrastructures and introducing large scale systems on transverse business over every groups of each power station could be established. (G.K.)

  9. Judges’ deadlines, deadlines for public administration and associations

    Directory of Open Access Journals (Sweden)

    Daniel Chabanol

    2015-01-01

    Full Text Available In the theory on the activity of the judge in disputes related to exceeding powers, one fundamental principle demands that this activity is ‘beyond time’: the judge examines some past events and objectively seeks whether the administrative act being disputed has been undertaken according to the norms which should have been applied, which the judge, if necessary, identifies retroactively (emphasising that s/he does not create them. The claim of the illegality of the administrative act leads to its retroactive revocation and to the reconstruction of what should have been in administrative activity. This theory has not however survived in relation to the principle of reality. The inevitable passing of time, both in public administration and in society resist the ‘beyond time’ aspect of judge activity. This resistance is founded on social expectations and on the principle of legal security. The judge in cases of exceeding powers also responds to the demands on the one hand to become more familiar with the methods of the judge in full adjudication disputes, and on the other hand, to abandon to a certain extent the retroactivity of its intervention. This raises the following question of: is the judge in cases of legality still some kind of ‘general inspector’ of public power or does the judge become a means of appeasing the conflict which occurs in life in general? Similarly, a judge in a dispute on exceeding powers responding to a concrete social demand accepting that revocation, even retroactive, of an administrative act is not always sufficient to reinstate the principle of a country that adheres to the law. That is why, as a deciding criterion in judicial functioning, the concept of the duration of proceedings has been introduced. So, besides the customary damages and the result of consequences caused by the unreasonable duration of proceedings, it has been concluded that new attention be paid to the duration of proceedings. This is

  10. Highlights of Electric Power Industry in China

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    @@Reform and Development of Electric Power Management Before 1978, China's electric power industry,managed by the Central Government, was a vertically monopoly sector. Along with China's reformation of economy structure started in 1978, electric power industry has step on its road of restructuring and deregulation. Up to now administration of China's electric power industry underwent following reciprocative changes:

  11. Umatilla River Subbasin Fish Habitat Improvement Program, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    St. Hilaire, Danny R. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-05-01

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat conditions. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, through the restoration of stable channel function. This report provides a summary of Program activities for the 2005 calendar year (January 1 through December 31, 2005), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance (O&M), and (4) Monitoring and Evaluation (M&E). This report also summarizes activities associated with Program Administration, Interagency Coordination, and Public Education.

  12. Electrochemical Power Plant for Terrestrial Flight Platforms, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — An electrochemical power plant is proposed by MicroCell Technologies to provide power to terrestrial flight platforms. Our power plant is based upon a proton...

  13. Voices of nuclear-power monitors in fiscal 1981

    International Nuclear Information System (INIS)

    1983-01-01

    The system of ''nuclear-power monitors'', started in fiscal 1977, is for the purpose of hearing the opinions of general people on nuclear power development and utilization and reflecting the results to the governmental nuclear power administration. The number of monitors in fiscal 1981 is a total of 504. The results in the fiscal year are described: (1) Questionnaire survey: The survey was made from March 10 to 25, 1982. Of the total, 355 (70.4%) answered the questions concerning the following matters: the future of energy, the development of nuclear power, the administration of nuclear power safety, and nuclear power public relations. (2) Voices (opinion) sent by the monitors: Of the total 150 items sent from September, 1981, to March, 1982, 48 concerned public relations, 26 were about the development and utilization and 25 were about the safety. (Mori, K.)

  14. WNP-1 and -3 study: 1987 resource strategy

    International Nuclear Information System (INIS)

    1987-05-01

    Since the draft WNP-1 and -3 Study, Bonneville has decided to only commit funds for resources that are needed for committed loads. Currently, no investor-owned utility (IOU) has made a contractual commitment to purchase from Bonneville beyond 1993. For this reason, Bonneville now includes no IOU load growth in assessing the need for WNP-1 and -3 in its ''base case'' analysis. Bonneville's study conclusion is that, on balance, preserving both WNP-1 and -3 is still the prudent choice for now. However, as soon as significant progress has been made in resolving uncertainties, Bonneville will revisit the prudence of continued preservation. The findings indicate no clear choice between preservation and termination on a net present value basis, a choice somewhat in favor of preservation from an economic risk management standpoint, and a clear choice in favor of preservation on the basis of contract risks and refinancing uncertainty. Considerations of near-term Bonneville revenue requirements and WNP-1 conversion uncertainty also are somewhat favorable to continued preservation. There are no other decision factors which strongly favor preservation or termination

  15. Power, plutonium and politics

    International Nuclear Information System (INIS)

    Simpson, J.

    1982-01-01

    Distinctions between civil and military nuclear energy activities in the context of the Anglo-American trading relationship are described. Origins of the civil-military divide, the beginning of the nuclear power industry, and the use of British nuclear power stations for military purposes are discussed together with IAEA safeguards and US policies initiated by the Carter and Reagan administrations. (U.K.)

  16. Superconducting magnetic energy storage (SMES) program. Progress report, January 1-December 31, 1984

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1985-05-01

    The 30 MJ, 10 MW superconducting magnetic energy storage (SMES) system was devised to interact in the Western US Power System as an alternate means to damp unstable oscillations at 0.35 Hz on the Pacific HVAC Intertie. The SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration (BPA). The operating limits of the 30 MJ SMES unit were established, and different means of controlling real and reactive power were tested. The unit can follow a sinusoidal power demand signal with an amplitude of up to 8.6 MW with the converter working in a 12 pulse mode. When the converter operates in the constant VAR mode, a time varying real power demand signal of up to 5 MW can be met. Experiments showed that the Pacific ac Intertie has current and reactive power variations of the same frequency as the modulating frequency of the SMES device. Endurance tests were run to assess the reliability of the SMES subsystems with a narrow band noise input, which is characteristic of the modulation signal for stabilizer operation. During the endurance tests, parameters of the ac power system were determined. Converter short circuit tests, load tests under various control conditions, dc breaker tests for coil current interruption, and converter failure mode tests were conducted. The experimental operation of the SMES system was concluded and the operation was terminated in early 1984

  17. Development and application of automatic frequency and power control systems for large power units

    Energy Technology Data Exchange (ETDEWEB)

    V.A. Bilenko; A.D. Melamed; E.E. Mikushevich; D.Y. Nikol' skii; R.L. Rogachev; N.A. Romanov [ZAO Interavtomatika (Interautomatika AG), Moscow (Russian Federation)

    2008-07-01

    We describe the results of work carried out at ZAO Interavtomatika on the development and putting into use of a system for automatically controlling the frequency and power output of large coal-fired power units involving the retrofitting of the turbine's hydraulic automatic control system. Certificates affirming conformity to the Standard of the System Operator Centralized Dispatching Administration (SO-CDA) have been received for eight power units as an outcome of these efforts.

  18. Western Area Power Administration annual site environmental report for calendar year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-12-31

    This document outlines the accomplishments and status of the environmental program of the Western Area Power Administration (Western) for calendar year 2005. In 2005, Western submitted 190 reports to state and local emergency response personnel and had 60 California Hazardous Materials Business Plans in place as required under the Emergency Planning and Community Right-to-Know Act. These reports identify the hazardous substances contained at these sites. At sites where potential oil spills could harm surrounding ecosystems and waterways, Western prepares Spill Prevention, Control, and Countermeasure (SPCC) plans. These plans identify measures to prevent spills from harming the environment, such as identifying the need for secondary containment at facilities. Western currently has SPCC plans for 154 facilities in 13 states. In 2005, Western updated 19 SPCC plans and prepared one new plan. Western operated under 107 environmental permits in 2005. Western evaluates the impact of its planned actions on the environment by preparing National Environmental Policy Act documentation. In 2005, Western completed or was working on 60 categorical exclusions, 18 environmental assessments and eight environmental impact statements, issued six Findings of No Significant Impact, and prepared four Mitigation Action Plans. Western held several public workshops/meetings and consulted with 70 American Indian Tribes for various projects. In 2005, Western was working on or had completed 11 Section 7 consultations under the Endangered Species Act. In 2005, Western recycled more than 3,600 metric tons of electrical equipment, mineral oil dielectric fluid, asphalt, fluorescent and metal halide light bulbs, wood poles and crossarms, and other items as well as office waste. Western made $437,816 worth of purchases containing recovered content materials. Western met the requirement of Executive Order 13148, Greening the Government through Leadership in Environmental Management to have its

  19. The Spatial Practices of School Administrative Clerks: Making Space for Contributive Justice

    Science.gov (United States)

    Bayat, Abdullah

    2012-01-01

    This article discusses the work practices of the much neglected phenomenon of the work of school administrative clerks in schools. Popular accounts of school administrative clerks portray them as subjectified--assigned roles with limited power and discretion--as subordinate and expected to be compliant, passive and deferent to the principal and…

  20. The organizations, the power and Michel Foucault / Las organizaciones, el poder y Michel Foucault

    Directory of Open Access Journals (Sweden)

    Javier Carreón Guillén

    2008-10-01

    Full Text Available Max Weber alleged that power and domination coexist in organizations; and that power is the ability to attain certain resources (economic, force, knowledge, etc.. When an organization is operating -using these resources, e.g., power-, and requires that orders are observed, domination must be applied under the logic of the administrative framework. This assumption attributes, as expected, a very reactionary role to the administration. Foucault rephrases the dilemma using the microphysics of power, relieving the administration of any suspicion of conservatism.

  1. 21 CFR 890.3710 - Powered communication system.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Powered communication system. 890.3710 Section 890.3710 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... communication system. (a) Identification. A powered communication system is an AC- or battery-powered device...

  2. Prognostics of Power MOSFET

    Data.gov (United States)

    National Aeronautics and Space Administration — This paper demonstrates how to apply prognostics to power MOSFETs (metal oxide field effect transistor). The methodology uses thermal cycling to age devices and...

  3. Is it Necessary a Higher Administrative Board in Romania?

    Directory of Open Access Journals (Sweden)

    Emil Balan

    2011-05-01

    Full Text Available The idea of establishing a forum of thought and advice for policies and their implementation norms in the field of public administration, a body without jurisdictional role, comes out from the necessity of organizing a professional and balanced support of such decisions. Obviously we are placed in front of a body of the executive power, which imposes to be constituted as an autonomous administrative authority. The competency of such a body would be placed in the field of initializing/advising of projects of normative juridical acts that concern the organization, the administrative rapports and civil service, the non-contentious administrative procedure at the state’s level and at the local level. Is it necessary such a body in the Romanian political and administrative system? And which similar bodies do we find in other countries? The present study is researching for an answer.

  4. Efficient, Long-Lived Radioisotope Power Generator, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Radiation Monitoring Devices, Inc., (RMD) proposes to develop an alternative very long term, radioisotope power source with thermoelectric power conversion with...

  5. Voices of nuclear power 'monitors' in fiscal 1985: results of the questionnaire

    International Nuclear Information System (INIS)

    1986-01-01

    The system of nuclear power 'monitors' is to hear opinions etc. of the general people (i.e. of nuclear power monitors) on the nuclear power development and utilization and thereby to reflect the results in the nuclear power administration in Japan. The questionnairing survey by mail was made in June 1985 with 536 monitors across the country, of which 474 answered the questions. The results are described in the following: energies in the future, the development of nuclear power, the development of advanced-type reactors, the nuclear fuel cycle, nuclear power safety administration, nuclear hazard prevention, nuclear power PR activities. (Mori, K.)

  6. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  7. Wildlife mitigation program. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information

  8. Economic impacts of geothermal development in Skamania County, Washington

    International Nuclear Information System (INIS)

    Lesser, J.A.

    1992-07-01

    This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Skamania County, Washington, near Mt. Adams, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council. Skamania County was chosen due to both identified geothermal resources and developer interest. The analysis will focus on two phases: a plant construction phase, including well field development, generating plant construction, and transmission line construction; and an operations phase. Economic impacts will occur to the extent that construction and operations affect the local economy. These impacts will depend on the existing structure of the Skamania County economy and estimates of revenues that may accrue to the county as a result of plant construction, operation, and maintenance. Specific impacts may include additional direct employment at the plant, secondary impacts from wage payments being used to purchase locally produced goods and services, and impacts due to expenditures of royalty and tax payments received by the county. The basis for the analysis of economic impacts in this study is the US Forest Service IMPLAN input-output modeling system

  9. Economic impacts of geothermal development in Whatcom County, Washington

    International Nuclear Information System (INIS)

    Lesser, J.A.

    1992-07-01

    This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Whatcom County, Washington, near Mt. Baker, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council. Whatcom County was chosen due to both identified geotherrnal resources and developer interest. The analysis will focus on two phases: a plant construction phase, including well field development, generating plant construction, and transmission line construction; and an operations phase. Economic impacts will occur to the extent that construction and operations affect the local economy. These impacts will depend on the existing structure of the Whatcom County economy and estimates of revenues that may accrue to the county as a result of plant construction, operation, and maintenance. Specific impacts may include additional direct employment at the plant, secondary impacts from wage payments being used to purchase locally produced goods and services, and impacts due to expenditures of royalty and tax payments received by the county. The basis for the analysis of economic impacts in this study is the US Forest Service IMPLAN input-output modeling system

  10. Geothermal : Economic Impacts of Geothermal Development in Whatcom County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Lesser, Jonathan A.

    1992-07-01

    This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Whatcom County, Washington, near Mt. Baker, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council. Whatcom County was chosen due to both identified geotherrnal resources and developer interest. The analysis will focus on two phases: a plant construction phase, including well field development, generating plant construction, and transmission line construction; and an operations phase. Economic impacts will occur to the extent that construction and operations affect the local economy. These impacts will depend on the existing structure of the Whatcom County economy and estimates of revenues that may accrue to the county as a result of plant construction, operation, and maintenance. Specific impacts may include additional direct employment at the plant, secondary impacts from wage payments being used to purchase locally produced goods and services, and impacts due to expenditures of royalty and tax payments received by the county. The basis for the analysis of economic impacts in this study is the US Forest Service IMPLAN input-output modeling system.

  11. Carrying an anti-nuclear-power badge in the teaching profession

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The carrying of an anti-nuclear-power badge by a teacher during school hours violates the order to practice reticence in political activities. At the beginning of 1977 some teachers, the plaintiff as well, carried anti-nuclear-power badges, i.e. a round badge with a stylized red sun on a yellow background with the inscription 'Nuclear power - No, thank you'. Following a general direction by the educational authorities, the headmistress forbade plaintiff on 4.11.77 to visibly carry this badge during lessons. This protest having been without success, action was brought with partial success at the Administrative and Higher Administrative Court. The Federal Administrative Court dismissed the case. (orig./HSCH) [de

  12. Planning and administration of human resources in Brazilian Electric Power Companies; Planejamento e administracao de recursos humanos nas empresas brasileiras do setor de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Devanir Vieira

    1985-12-01

    Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.

  13. Health effects associated with energy conservation measures in commercial buildings

    International Nuclear Information System (INIS)

    Stenner, R.D.; Baechler, M.C.

    1990-09-01

    Indoor air quality can conceivably be impacted by hundreds of different chemicals. More than 900 different organic compounds alone have been identified in indoor air. The health effects that could potentially arise from exposure to individual pollutants or mixtures of pollutants cover the full range of acute and chronic effects, including largely reversible responses, such as rashes and irritations, as well as irreversible toxic and carcinogenic effects. These indoor contaminants are emitted from a large variety of materials and substances that are widespread components of everyday life. Pacific Northwest Laboratory conducted a search of the peer-reviewed literature on health effects associated with indoor air contaminants for the Bonneville Power Administration to aid the agency in the preparation of environmental documents. The results of this search are reported in two volumes. Volume 1 is a summary of the results of the literature search; Volume 2 is the complete results of the literature search and contains all references to the material reviewed. 16 tabs

  14. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  15. Wind River Watershed Restoration, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Jezorek, Ian G.; Connolly, Patrick J.; Munz, Carrie [U.S. Geological Survey

    2008-11-10

    This report summarizes work completed by U.S. Geological Survey's Columbia River Research Laboratory (USGS-CRRL) in the Wind River subbasin during the period April 2005 through March 2006 under Bonneville Power Administration (BPA) contract 22095. During this period, we collected temperature, flow, and habitat data to characterize habitat condition and variation within and among tributaries and mainstem sections in the Wind River subbasin. We also conducted electrofishing and snorkeling surveys to determine juvenile salmonid populations within select study areas throughout the subbasin. Portions of this work were completed with additional funding from U.S. Fish and Wildlife Service (USFWS) and the Lower Columbia Fish Enhancement Group (LCFEG). A statement of work (SOW) was submitted to BPA in March 2005 that outlined work to be performed by USGS-CRRL. The SOW was organized by work elements, with each describing a research task. This report summarizes the progress completed under each work element.

  16. Analysis of organizational options for the uranium enrichment enterprise in relation to asset divesture

    International Nuclear Information System (INIS)

    Harrer, B.J.; Hattrup, M.P.; Dase, J.E.; Nicholls, A.K.

    1986-08-01

    This report presents a comparison of the characteristics of some prominent examples of independent government corporations and agencies with respect to the Department of Energy's (DOE) uranium enrichment enterprise. The six examples studied were: the Bonneville Power Administration (BPA); the Tennessee Valley Authority (TVA); the Synthetic Fuels Corporation (SYNFUELS); the Consolidated Rail Corporation (CONRAIL); the British Telecommunications Corporation (British TELECOM); and the Communications Satellite Organization (COMSAT), in order of decreasing levels of government ownership and control. They range from BPA, which is organized as an agency within DOE, to COMSAT, which is privately owned and free from almost all regulations common to government agencies. Differences in the degree of government involvement in these corporations and in many other characteristics serve to illustrate that there are no accepted standards for defining the characteristics of government corporations. Thus, historical precedent indicates considerable flexibility would be available in the development of enabling legislation to reorganize the enrichment enterprise as a government corporation or independent government agency

  17. Health effects associated with energy conservation measures in commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Stenner, R.D.; Baechler, M.C.

    1990-09-01

    Indoor air quality can conceivably be impacted by hundreds of different chemicals. More than 900 different organic compounds alone have been identified in indoor air. The health effects that could potentially arise from exposure to individual pollutants or mixtures of pollutants cover the full range of acute and chronic effects, including largely reversible responses, such as rashes and irritations, as well as irreversible toxic and carcinogenic effects. These indoor contaminants are emitted from a large variety of materials and substances that are widespread components of everyday life. Pacific Northwest Laboratory conducted a search of the peer-reviewed literature on health effects associated with indoor air contaminants for the Bonneville Power Administration to aid the agency in the preparation of environmental documents. The results of this search are reported in two volumes. Volume 1 is a summary of the results of the literature search; Volume 2 is the complete results of the literature search and contains all references to the material reviewed. 16 tabs.

  18. Survey of magnetic fields near BPA 230-kV and 500-kV transmission lines

    International Nuclear Information System (INIS)

    Perrin, N.; Aggarwal, R.P.

    1991-01-01

    The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs

  19. Field review of fish habitat improvement projects in central Idaho

    International Nuclear Information System (INIS)

    Beschta, R.L.; Griffith, J.; Wesche, T.A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho

  20. 1992 Columbia River salmon flow measures Options Analysis/EIS

    International Nuclear Information System (INIS)

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and one private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described