WorldWideScience

Sample records for availability

  1. Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Places available The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses : Introduction à Outlook : 19.8.2004 (1 journée) Outlook (short course I) : E-mail : 31.8.2004 (2 hours, morning) Outlook (short course II) : Calendar, Tasks and Notes : 31.8.2004 (2 hours, afternoon) Instructor-led WBTechT Study or Follow-up for Microsoft Applications : 7.9.2004 (morning) Outlook (short course III) : Meetings and Delegation : 7.9.2004 (2 hours, afternoon) Introduction ...

  2. Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Project Planning with MS-Project : 15 & 22.1.2004 (2 days) Joint PVSS JCOP Framework Course : 2 sessions : 2 - 6.2.2004 and 16 - 20-2-2004 (5 days) Hands-on Introduction to Python Programming : 16 - 18.2.2004 (3 days - free of charge) C++ for Particle Physicists : 8 - 12.3.2004 ( 6 X 4-hour sessions)

  3. Places available**

    CERN Document Server

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The JAVA Programming Language Level 1 :9 & 10.1.2004 (2 days) The JAVA Programming Language Level 2 : 11 to 13.1.2004 (3 days) Hands-on Introduction to Python Programming : 16 - 18.2.2004 (3 days - free of charge) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon - free of charge) C++ for Particle Physicists : 8 - 12.3.2004...

  4. Places available**

    CERN Document Server

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval Tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: JAVA 2 Enterprise Edition - Part 1 : WEB Applications : 20 & 21.11.03(2 days) FrontPage 2000 - niveau 1 : 20 & 21.11.03 (2 jours) Oracle 8i : SQL : 3 - 5.12.03 (3 days) Oracle 8i : Programming with PL/SQL : 8 - 10.12.03 (3 days) The JAVA Programming Language - leve...

  5. Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: MATLAB Fundamentals and Programming Techniques (ML01) :2 & 3.12.03 (2 days) Oracle 8i : SQL : 3 - 5.12.03 (3 days) The EDMS MTF in practice : 5.12.03 (afternoon, free of charge) Modeling Dynamic Systems with Simulink (SL01) : 8 & 9.12.03 (2 days) Signal Processing with MATLAB (SG01) : 11 & ...

  6. Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: ACCESS 2000 - niveau 1 : 13 & 14.11.03 (2 jours) C++ for Particle Physicists : 17 – 21.11.03 (6 X 3-hour lectures) Programmation automate Schneider TSX Premium – niveau 2 : 18 – 21.11.03 (4 jours) JAVA 2 Enterprise Edition – Part 1 : WEB Applications : 20 & ...

  7. Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses : EXCEL 2000 - niveau 1 : 20 & 22.10.03 (2 jours) CLEAN-2002 : Working in a Cleanroom (free of charge) : 23.10.03 (half day) The EDMS-MTF in practice (free of charge) :  28 -  30.10.03 (6 half-day sessions) AutoCAD 2002 - Level 1 : 3, 4, 12, 13.11.03 (4 days) LabVIEW TestStand ver. 3 : 4 & 5.11.03 (2 days) Introduction to Pspice : 4.11.03 p.m. (half-day) Hands-on Introduction to Python Programm...

  8. Places available**

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt.TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The JAVA Programming Language Level 1 : 9 & 10.1.2004 (2 days) The JAVA Programming Language Level 2 : 11 to 13.1.2004 (3 days) LabVIEW base 1 : 25 - 27.2.2004 (3 jours) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon - free of charge) C++ for Particle Physicists : 8 - 12.3.2004 ( 6 X 4-hour sessions) LabVIEW Basics 1 : 22 - 24.3.20...

  9. Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval Tel. 74924technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: MATLAB Fundamentals and Programming Techniques (ML01) : 2 & 3.12.03 (2 days) Oracle 8i : SQL : 3 - 5.12.03 (3 days) The EDMS MTF in practice : 5.12.03 (afternoon, free of charge) Modeling Dynamic Systems with Simulink (SL01) : 8 & 9.12.03 (2 days) Signal Processing with MATLAB (SG01) : 11 & 12.12.03 (2 days) The JAVA Programming Language - l...

  10. Introducing high availability to non high available designed applications

    Energy Technology Data Exchange (ETDEWEB)

    Zelnicek, Pierre; Kebschull, Udo [Kirchhoff Institute of Physics, Ruprecht-Karls-University Heidelberg (Germany); Haaland, Oystein Senneset [Physic Institut, University of Bergen, Bergen (Norway); Lindenstruth, Volker [Frankfurt Institut fuer Advanced Studies, University Frankfurt (Germany)

    2010-07-01

    A common problem in scientific computing environments and compute clusters today, is how to apply high availability to legacy applications. These applications are becoming more and more a problem in increasingly complex environments and with business grade availability constraints that requires 24 x 7 x 365 hours of operation. For a majority of applications, redesign is not an option. Either because of being closed source or the effort involved would be just as great as re-writing the application from scratch. Neither is letting normal operators restart and reconfigure the applications on backup nodes a solution. In addition to the possibility of mistakes from non-experts and the cost of keeping personnel at work 24/7, these kind of operations would require administrator privileges within the compute environment and would therefore be a security risk. Therefore, these legacy applications have to be monitored and if a failure occurs autonomously migrated to a working node. The pacemaker framework is designed for both tasks and ensures the availability of the legacy applications. Distributed redundant block devices are used for fault tolerant distributed data storage. The result is an Availability Environment Classification 2 (AEC-2).

  11. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses: Conception de PCB rapides dans le flot Cadence : 11.6.03 (matin) EXCEL 2000 - level 1 : 12 & 13.6.03 (2 days) Introduction to PVSS : 16.6.03 (p.m.) Basic PVSS : 17 - 19.6.03 (3 days) Réalisation de PCB rapides dans le flot Cadence : 17.6.03 (matin) PVSS - JCOP Framework Tutorial : 20.6.03 (1 day) Programmation automate Schneider : Programmation automate Schneider TSX Premium - 2ème niveau : 24 - 27.6.03 (4 jours) - audience : toute personne qui veux maitriser la mise en uvre et la programmation des fonctions spécialisées d'un automate TSX Premium - objectifs : maitriser la mise en uvre et la programmation des fonctions spécialisées d'un automate TSX Premium Cours de sécurité : Etre TSO au CERN : Prochaines sessions : 24, 25 & 27.6.03 - 4, 5 & 7.11.03 (session de 3 jours) ** The number of places available may vary. Please check our Web site to find out the current availability. If you wish to participate in one of these courses, pl...

  12. PLACES AVAILABLE

    CERN Multimedia

    Enseignement Technique; Tél. 74924; Technical Training; Monique Duval; Tel. 74924

    2000-01-01

    Places available Places are available in the following courses:   LabView hands-on 13.11.00 4 hours LabView Basics 1 14 - 16.11.00 3 days Nouveautés de WORD 19 et 20.10.00 2 jours ACCESS 1er niveau 30 - 31.10.00 2 jours Advanced aspects of the C language 2 - 3.11.00 2 days Introduction to Oracle SQL and PL/SQL 13 - 17.11.00 5 days C++ for Particle Physicists 20 - 24.11.00 6 lectures Develop PL/SQL Program Units 20 - 22.11.00 3 days Oracle Application Server Develop Web-Based Applications with PL/SQL 27 - 28.11.00 2 days Programmation TSX Premium 1 28.11 - 1.12.00 4 jours Programmation TSX Premium 2 12 - 15.12.00 4 jours If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : http://www.cern.ch/Training/ or fill in an “application for training” form available from your Divisional Secretariat or from your DTO (Divisional Training Offi...

  13. Proxmox high availability

    CERN Document Server

    Cheng, Simon MC

    2014-01-01

    If you want to know the secrets of virtualization and how to implement high availability on your services, this is the book for you. For those of you who are already using Proxmox, this book offers you the chance to build a high availability cluster with a distributed filesystem to further protect your system from failure.

  14. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Introduction to Databases :  3 - 4.7.01 (2 days) The JAVA programming language Level 2 : 4 - 6.7.01 (3 days) Enterprise JavaBeans :  9 - 11.7.01 (3 days) Design Patterns :  10 - 12.7.01 (3 days) C++ for Particle Physicists :  23 - 27.7.01 (6 3-hour lectures) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt.

  15. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: CLEAN-2002 : Travailler en salle blanche (cours gratuit) : 13.08.2002 (matin) Introduction to the CERN Enginnering Data Management System :  27.8.02  (1 day) The CERN Engineering Data Management System for Advanced Users :  28.8.02  (1 day) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : Technical Training or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Technical Training Monique Duval Tel.74924 monique.duval@cern.ch    

  16. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: C++ Programming Level 2 - Traps & Pitfalls:  16 - 19.7.02 (4 days) Frontpage 2000 - level 1 :  22 - 23.7.02  (2 days) Introduction à Windows 2000 au CERN : 24.7.02 (après-midi) CLEAN-2002 : Travailler en salle blanche (cours gratuit) : 13.08.2002 (matin) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : Technical Training or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Technical Training Monique Duval Tel.74924 monique.duval@cern.ch

  17. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Introduction to Perl 5 : 2 - 3.7.01 (2 days) Introduction to Databases :  3 - 4.7.01 (2 days) JAVA programming language Level 2 : 4 - 6.7.01 (3 days) Enterprise JavaBeans :  9 - 11.7.01 (3 days) Design Patterns :  10 - 12.7.01 (3 days) C++ for Particle Physicists :  23 - 27.7.01 (6 3-hour lectures) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt.

  18. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: December 2002   PCAD Schémas - Débutants :  5 & 6.12.02  (2 jours) PCAD PCB - Débutants :  9 - 11.12.02  (3 jours) FrontPage 2000 - level 1:  9 & 10.12.02  (2 days) Introduction à la CAO Cadence (cours gratuit) :  10 & 11.12.02  (2 jours) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : Technical Training or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Technical Training Monique Duval Tel.74924 monique.duval@cern.ch

  19. Technical training: places available

    CERN Multimedia

    HR Department

    2007-01-01

    CERN Technical Training: Open Courses (April - June 2007) The following course sessions are currently scheduled in the framework of the CERN Technical Training Programme 2007:   AutoCAD 2006 - niveau 1 (course in French): 25.4.- 26.4.2007 & 2.5. - 3.5.2007 (4 days in 2 modules, 5 places available) AutoCAD 2006 - niveau 1 (course in French): 27.6.- 28.6.2007 & 3.7. - 4.7.2007 (4 days in 2 modules, 5 places available) AutoCAD Mechanical 2006 (course in French) 21.6.-22.6.2007 (2 days, 8 places available) * NEW COURSE* Automate de securite S7 (course in French) 14.5.-16.5.2007 (3 days, 4 places available) * NEW COURSE* Automate de securite S7 (course in French): 9.5.-11.5.2007 (3 days, 4 places available) JCOP - Joint PVSS-JCOP Frameswork (course in English): 21.5.-25.5.2007 (5 days, 12 places available) JCOP - Finite State Machines in the JCOP Frameswork (course in English): 12.6.-14.6.2007 (3 days, 12 places available) LabVIEW Basics 1 (in English): 2.-4.5.2007 (3 days, 7 places ...

  20. Technical training - places available

    CERN Multimedia

    2012-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch Valeria Perez Reale, Learning Specialist, Technical Programme Coordinator (Tel.: 62424) Eva Stern and Elise Romero, Technical Training Administration (Tel.: 74924) HR Department »Electronics design Next Session Duration Language Availability Comprehensive VHDL for FPGA Design 08-Oct-12 to 12-Oct-12 5 days English 3 places available Foundations of Electromagnetism and Magnet Design (EMAG) 14-Nov-12 to 27-Nov-12 6 days English 20 places available Impacts de la suppression du plomb (RoHS) en électronique 26-Oct-12 to 26-Oct-12 8 hours French 15 places available Introduction to VHDL 10-Oct-12 to 11-Oct-12 2 days English 7 places available LabVIEW Real Time and FPGA 13-Nov-12 to 16-Nov-12 5 days French 5 places available »Mechanical design Next Se...

  1. Technical training - Places available

    CERN Document Server

    2012-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch Valeria Perez Reale, Learning Specialist, Technical Programme Coordinator (Tel.: 62424) Eva Stern and Elise Romero, Technical Training Administration (Tel.: 74924)   Electronics design Next Session Duration Language Availability Certified LabVIEW Associate Developer (CLAD) 06-Dec-12 to 06-Dec-12 1 hour English One more place available Compatibilité électromagnetique (CEM): Applications 23-Nov-12 to 23-Nov-12 3.5 hours English 3 places available Compatibilité électromagnétique (CEM): Introduction 23-Nov-12 to 23-Nov-12 3 hours English 43 places available Effets des Radiations sur les composants et systèmes électroniques 11-Dec-12 to 12-Dec-12 1 day 4 hours French 9 places available LabVIEW for beginners ...

  2. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: November 2002   Hands-on Object-Oriented Design and Programming with C++:  19 - 21.11.02  (3 days)  December 2002   LabVIEW - DSC (English) :  2 - 3.12.02  (2 days) AutoCAD 2002 - niveau 2 :  2 & 3.12.02  (2 jours) FileMaker (Français) :  2 - 5.12.02  (4 jours) PCAD Schémas - Débutants :  5 & 6.12.02  (2 jours) PCAD PCB - Débutants :  9 - 11.12.02  (3 jours) FrontPage 2000 - level 1:  9 & 10.12.02  (2 days) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : Technical Training or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisiona...

  3. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: November 2002   Java Programming Language level 1 :  28 & 29.11.02  (2 days) December 2002   LabVIEW - DSC (English) :  2 - 3.12.02  (2 days) FileMaker (Français) :  2 - 5.12.02  (4 jours) PCAD Schémas - Débutants :  5 & 6.12.02  (2 jours) PCAD PCB - Débutants :  9 - 11.12.02  (3 jours) FrontPage 2000 - level 1:  9 & 10.12.02  (2 days) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : Technical Training or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Technical Training M...

  4. PLACES AVAILABLE

    CERN Multimedia

    TECHNICAL TRAINING; Tel. 74460

    2001-01-01

    Places are available in the following courses: MS-Project 1er niveau : 20 - 23.2.01 (4 matins) Architecture d'automatisme : 20 - 21.2.01 (2 jours) Introduction à PowerPoint : 26.2.01 (1 journée) Programmation TSX Premium 1 (Schneider) : 26.2 - 2.3.01 (5 jours) Premiers pas avec votre PC : 27.2 - 2.3.01 (4 matins) C++ for Particle Physicists : 5 - 9.3.01 (6*3 hour lectures) EXCEL : 6, 7 et 13, 14.3.01 (4 jours) The JAVA programming language level 2 :  12 - 14.3.01 (3 days) Nouveautés de FileMaker :  20 - 23.03.01 (4 matins) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt.

  5. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: Habilitation électrique : recyclage HT/BT : 11 - 15.3.2002  (2 * 2 heures) PVSS Basics :  8 - 12.4.02  (5 days) ELEC-2002 : Spring Term :  9, 11, 16, 18, 23, 25, 30.4.02 (7 * 2.5 hours) LabVIEW base 1 : 22 - 24.4.02 (3 jours) LabVIEW DSC (F) 25 & 26.4.02 (2 jours) LabVIEW Basics 2 : 13 & 14.5.02 (2 days) LabVIEW DAQ (F) : 15 & 16.5.02 (2 jours) Cours sur la migration AutoCAD :   AutoCAD : Mise à jour AutoCAD r-14 vers 2002 (2 jours) AutoCAD Mechanical PowerPack 6 basé sur AutoCAD 2002 (5 jours) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : Technical Training or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applica...

  6. JUNOS High Availability

    CERN Document Server

    Sonderegger, James; Milne, Kieran; Palislamovic, Senad

    2009-01-01

    Whether your network is a complex carrier or just a few machines supporting a small enterprise, JUNOS High Availability will help you build reliable and resilient networks that include Juniper Networks devices. With this book's valuable advice on software upgrades, scalability, remote network monitoring and management, high-availability protocols such as VRRP, and more, you'll have your network uptime at the five, six, or even seven nines -- or 99.99999% of the time. Rather than focus on "greenfield" designs, the authors explain how to intelligently modify multi-vendor networks. You'll learn

  7. Technical training - Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 16.5.2006 (May-November course sessions) Technical Training: Places available The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Title Hours Date Language ACROBAT 7.0 : Utilisation de fichiers PDF 8 8.05.06 F WORD 2003 - niveau 2 : ECDL 16 22-23.05.06 23-24.05.06 F Comprehensive VHDL for FPGA Design 40 29.05-2.06.06 E C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls 32 30.05-2.06.06 E ACROBAT 7.0 : Utilisation de fichiers PDF 24 7-9.06.06 E AutoCAD Mechanical 2006 16 13-14.06.06 F CERN EDMS for Local Administrators 16 13-14.06.06 E LabVIEW Base 2 32 27.06-5.07.06 F C++ Programming Part 3 - Templates and the STL (Standard Template Library) 16 27-28.06.06 E C++ Programming Part 4 - Exceptions 8 29.06.06 E FrontPage 2003 - niveau 1 16 29-...

  8. Estimations of actual availability

    International Nuclear Information System (INIS)

    Molan, M.; Molan, G.

    2001-01-01

    Adaptation of working environment (social, organizational, physical and physical) should assure higher level of workers' availability and consequently higher level of workers' performance. A special theoretical model for description of connections between environmental factors, human availability and performance was developed and validated. The central part of the model is evaluations of human actual availability in the real working situation or fitness for duties self-estimation. The model was tested in different working environments. On the numerous (2000) workers, standardized values and critical limits for an availability questionnaire were defined. Standardized method was used in identification of the most important impact of environmental factors. Identified problems were eliminated by investments in the organization in modification of selection and training procedures in humanization of working .environment. For workers with behavioural and health problems individual consultancy was offered. The described method is a tool for identification of impacts. In combination with behavioural analyses and mathematical analyses of connections, it offers possibilities to keep adequate level of human availability and fitness for duty in each real working situation. The model should be a tool for achieving adequate level of nuclear safety by keeping the adequate level of workers' availability and fitness for duty. For each individual worker possibility for estimation of level of actual fitness for duty is possible. Effects of prolonged work and additional tasks should be evaluated. Evaluations of health status effects and ageing are possible on the individual level. (author)

  9. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The Joint PVSS JCOP Framework: 14 - 18.6.2004 (5 days) EXCEL 2003 - niveau 2 : 17 & 18.6.2004 (2 jours) MAGNE-04 : Magnétisme pour l'électrotechnique : 6 au 8.7.2004 (3 jours) Technical Training Monique Duval - Tel.74924 technical.training@cern.ch

  10. High availability IT services

    CERN Document Server

    Critchley, Terry

    2014-01-01

    This book starts with the basic premise that a service is comprised of the 3Ps-products, processes, and people. Moreover, these entities and their sub-entities interlink to support the services that end users require to run and support a business. This widens the scope of any availability design far beyond hardware and software. It also increases the potential for service failure for reasons beyond just hardware and software; the concept of logical outages. High Availability IT Services details the considerations for designing and running highly available ""services"" and not just the systems

  11. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel 74924

    2002-01-01

    Places are available in the following courses: LabView hands-on : 21.01.02 (1/2 journée) LabView DAQ hands-on : 21.01.02 (1/2 journée) FileMaker Pro : 22 - 25.1.02 (4 jours) MS-Project 2000 : 24 & 25.01.02 (2 jours) Introduction au PC et à Windows 2000 au CERN : 29 - 30.1.02 (2 jours) LabView Base 1 : 4 - 6.2.02 (3 jours) LabView DAQ (E) : 7 & 8.02.02 (2 days) Hands-on Object-Oriented Design & Programming with Java : 11 - 13.02.02 (3 days) C++ for Particle Physicists : 11 - 15.3.2002 (6 * 3 hour lectures) Cours sur la migration AutoCAD : AutoCAD : Mise à jour AutoCAD r-14 vers 2002 (2 jours) AutoCAD Mechanical PowerPack 6 basé sur AutoCAD 2002 (5 jours) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : Technical Training or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO ...

  12. Places available**

    CERN Multimedia

    Places are available in the following courses: Hands-on Introduction to Python Programming: 11-13.08.2003 (3 days) Introduction to the CERN Engineering Data Management System (EDMS): 26.08.2003 (1 day) The CERN Engineering Data Management System (EDMS) for Engineers: 27.08.2003 (1 day) CLEAN-2002 : Travailler en salle blanche : 4.09.2003 (une demi-journée) AutoCAD 2002 - Level 1: 4, 5, 15, 16.09.2003 (2 x 2 days) AutoCAD Mechanical 6 PowerPack : 17, 18, 25, 26.09.2003 et 2, 3.10.2003 (3 x 2 journées, français) AutoCAD 2002 - niveau 1 : 23, 24, 30.09.2003 et 1.10.2003 (2 x 2 journées) Introduction to the CERN Engineering Data Management System (EDMS): 23.09.2003 (1 day) The CERN Engineering Data Management System (EDMS) for Local Administrators: 24-25.09.2003 (2 days) AutoCAD 2002 - niveau 2 : 8 et 10.10.2003 (2 journées) CLEAN-2002: Working in a Cleanroom: 23.10.2003 (half day, p.m.) ** The number of places available may vary. Please check our Web site to find out the current availabili...

  13. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses: Hands-on Introduction to Python Programming: 11-13.08.2003(3 days) Introduction to the CERN Engineering Data Management System (EDMS): 26.08.2003 (1 day) The CERN Engineering Data Management System (EDMS) for Engineers: 27.08.2003 (1 day) CLEAN-2002 : Travailler en salle blanche : 4.09.2003 (une demi-journée) AutoCAD 2002 - Level 1: 4, 5, 15, 16.09.2003 (2 x 2 days) AutoCAD Mechanical 6 PowerPack : 17, 18, 25, 26.09.2003 et 2, 3.10.2003 (3 x 2 journées, français) AutoCAD 2002 - niveau 1 : 23, 24, 30.09.2003 et 1.10.2003 (2 x 2 journées) Introduction to the CERN Engineering Data Management System (EDMS): 23.09.2003 (1 day) The CERN Engineering Data Management System (EDMS) for Local Administrators: 24-25.09.2003 (2 days) AutoCAD 2002 - niveau 2 : 8 et 10.10.2003 (2 journées) CLEAN-2002: Working in a Cleanroom: 23.10.2003 (half day, p.m.) ** The number of places available may vary. Please ch...

  14. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: LabView Hands-on (bilingue/bilingual - gratuit/free of charge) : 13.9.02 (a.m.) LabView DAQ Hands-on (bilingue/bilingual - gratuit/free of charge) : 13.9.02 (p.m.) AutoCAD 2002 - niveau 1 : 19, 20, 26, 27.9.02 (4 jours) LabView Base 1 : 23 - 25.9.02 (3 jours) LabView DAQ (E) : 26 - 27.9.02 (2 days) AutoCAD Mechanical 6 PowerPack (F) : 30.9, 1, 2, 9, 10, 11.10.02 (6 jours) CLEAN-2002 : Working in a Cleanroom (free of charge) : 10.10.02 (half-day, p.m.) AutoCAD 2002 - niveau 2 : 14 - 15.10.02 (2 jours) AutoCAD 2002 - Level 1 : 17, 18, 24, 25.10.02 (4 days) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at : Technical Training or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Of...

  15. SSC accelerator availability allocation

    International Nuclear Information System (INIS)

    Dixon, K.T.; Franciscovich, J.

    1991-03-01

    Superconducting Super Collider (SSC) operational availability is an area of major concern, judged by the Central Design Group to present such risk that use of modern engineering tools would be essential to program success. Experience has shown that as accelerator beam availability falls below about 80%, efficiency of physics experiments degrades rapidly due to inability to maintain adequate coincident accelerator and detector operation. For this reason, the SSC availability goal has been set at 80%, even though the Fermi National Accelerator Laboratory accelerator, with a fraction of the SSC's complexity, has only recently approached that level. This paper describes the allocation of the top-level goal to part-level reliability and maintainability requirements, and it gives the results of parameter sensitivity studies designed to help identify the best approach to achieve the needed system availability within funding and schedule constraints. 1 ref., 12 figs., 4 tabs

  16. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Outlook (short course I) : E-mail : 31.8.2004 (2 hours, morning) Introduction à Outlook : Outlook (short course II) : Calendar, Tasks and Notes : 31.8.2004 (2 hours, afternoon) Instructor-led WBTechT Study or Follow-up for Microsoft Applications : 7.9.2004 (morning) Outlook (short course III) : Meetings and Delegation : 7.9.2004 (2 hours, afternoon) Introduction au VHDL et utilisation du simulateur ...

  17. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Joint PVSS JCOP Framework : 9 - 13.8.2004 (5 days) Introduction à Outlook : 19.8.2004 (1 jour) Outlook (Short Course I): E-mail: 31.8.2004 (2 hours, morning) Outlook (Short Course II): Calendar, Tasks and Notes: 31.8.2004 (2 hours, afternoon) Instructor-led WBTechT Study or Follow-up for Microsoft Applications: 7.9.2004 (morning) Outlook (Short Course III): Meetings and Delegation: 7.9.2004 (2 hours, afternoon) I...

  18. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Joint PVSS JCOP Framework : 9 - 13.8.2004 (5 days) Introduction à Outlook : 19.8.2004 (1 jour) Outlook (Short Course I): E-mail: 31.8.2004 (2 hours, morning) Outlook (Short Course II): Calendar, Tasks and Notes: 31.8.2004 (2 hours, afternoon) Hands-on Introduction to Python Programming: 1 - 3.9.2004 (3 days - free course) Instructor-led WBTechT Study or Follow-up for Microsoft Applications: 7.9.20...

  19. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: AutoCAD 2002 - niveau 1 : 13, 14, 23, 24.09.2004 (4 jours) Introduction to the CERN EDMS : 22.6.2004 (1 day) The CERN EDMS for local administrators : 23 & 24.6.2004 (2 days) MAGNE-04 : Magnétisme pour l'électrotechnique : 6 - 8.7.2004 (3 jours) Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE : 7 & 8.9.2004 (2 jours) ENSEIGNEMENT TECHNIQUE TECHNICAL TRAINING...

  20. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Introduction to the CERN EDMS : 22.6.2004 (1 day) The CERN EDMS for local administrators : 23 & 24.6.2004 (2 days) Compatibilité électromagnétique (CEM) - Introduction / Electromagnetic Compatibility (EMC) - Introduction: 7.7.2004 (morning) Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE : 7 & 8.9.2004 (2 jours) AutoCAD 2002 - niveau 1 : 13, 14, 23, 24.9.2004 (4 jours) Programmation STEP...

  1. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: FrontPage XP - niveau 2 : 26 & 27.4.2004 (2 jours) The Joint PVSS JCOP Framework : 26 - 30.4.2004 (5 days) Computational Electromagnetics with the ELEKTRA Module of OPERA-3D : 27 & 28.4.2004 (2 days) Hands-on Introduction to Python Programming : 3 - 5.5.2004 (3 days) LabVIEW Base 2 : 6 & 7.5.2004 (2 jours) Project Pla...

  2. TECHNICAL TRAINING: Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Hands-on Introduction to Python Programming : 12 - 14.11.03(3 days) ACCESS 2000 - niveau 1 : 13 & 14.11.03 (2 jours) C++ for Particle Physicists : 17 - 21.11.03 (6 X 3-hour lectures) Programmation automate Schneider TSX Premium - niveau 2 : 18 - 21.11.03 (4 jours) Project Planning with MS-Project  (free of charg...

  3. Availability program: Phase I report

    International Nuclear Information System (INIS)

    Thomson, S.L.; Dabiri, A.; Keeton, D.C.; Riemer, B.W.; Waganer, L.M.

    1985-05-01

    An Availability Working Group was formed within the Office of Fusion Energy in March 1984 to consider the establishment of an availability program for magnetic fusion. The scope of this program is defined to include the development of (1) a comprehensive data base, (2) empirical correlations, and (3) analytical methods for application to fusion facilities and devices. The long-term goal of the availability program is to develop a validated, integrated methodology that will provide (1) projections of plant availability and (2) input to design decisions on maintainability and system reliability requirements. The Phase I study group was commissioned to assess the status of work in progress that is relevant to the availability program. The scope of Phase I included surveys of existing data and data collection programs at operating fusion research facilities, the assessment of existing computer models to calculate system availability, and the review of methods to predict and correlate data on component failure and maintenance. The results of these investigations are reported to the Availability Working Group in this document

  4. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Project Planning with MS-Project :6 & 13.5.2004 (2 days) Word 2003 - niveau 1 : 10 & 11.5.2004 (2 jours) Oracle 9i : SQL : 17 - 19.5.2004 (3 days) Word 2003 - niveau 2 : 24 & 25.5.2004 (2 jours) EXCEL 2003 - niveau 1: 27 & 28.5.2004 (2 jours) STEP7 Programming Level 1 : 1 - 4.6.2004 (4 days) Oracle 9i : Programming with PL/SQL : 2 - 4.6.2...

  5. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: C++ for Particle Physicists : 8 - 12.3.2004 (6 X 4-hour sessions) Introduction to the CERN EDMS : 9.3.2004 (1 day, free of charge) The EDMS MTF in Practice : 10.3.2004 (morning, free of charge) CLEAN-2002: Working in a Cleanroom : 10.3.2004 (afternoon, free of charge) The CERN EDMS for Engineers : 11.3.2004 (1 day, free of charge) LabVIEW hands-on (E):...

  6. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: LabVIEW base 1 : 25 - 27.2.2004(3 jours) Instructor-led WBTechT study or follow-up for Microsoft applications : 26.2.2004 (morning) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon - free of charge) C++ for Particle Physicists : 8 - 12.3.2004 (6 X 4-hour sessions) LabVIEW hands-on (E) : 16.3.2004 (afternoon) LabVIEW Basics 1 : 22 - 24.3.2004 ...

  7. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Instructor-led WBTechT study for Microsoft applications :12.2.2004 (morning) Instructor-led WBTechT study or follow-up for Microsoft applications : 19.2.2004 (morning) LabVIEW TestStand I (E) : 23 & 24.2.2004 (2 days) LabVIEW base 1 : 25 - 27.2.2004 (3 jours) Instructor-led WBTechT study or follow-up for Microsoft applications : 19.2.2004 (morning) CLEAN-2002 ...

  8. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Instructor-led WBTechT study or follow-up for Microsoft applications : 19.2.2004 (morning) LabVIEW TestStand I (E) : 23 & 24.2.2004 (2 days) LabVIEW base 1 : 25 - 27.2.2004 (3 jours) Instructor-led WBTechT study or follow-up for Microsoft applications : 26.2.2004 (morning) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon - free of charge) C++ for Pa...

  9. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 30.5.2006 (June-November course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Titre Heure Date Langue ACROBAT 7.0 : Utilisation de fichiers PDF 8 6.06.06 F Introduction à InDesign 16 7-8.06.06 F Python: Hands-on Introduction 24 7-9.06.06 E LabVIEW Base 2 16 22-23.06.06 F FileMaker - niveau 1 16 26-27.06.06 F C++ Programming Part 3 - Templates and the STL (Standard Template Library) 16 27-28.06.06 E C++ Programming Part 4 - Exceptions 8 29.06.06 E FrontPage 2003 - niveau 1 16 29-30.06.06 F Manipulation des images 4 6.07.06 F Introduction to Databases and Database Design 16 11-12.07.06 E ACCESS 2003 - Level 1: ECDL 16 13-14.07.06 E-F Design Patterns 16 25-26.07.06 E Introduction à Dreamweaver MX 16 ...

  10. Technical training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 13.6.2006 (June-December course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Titre Heure Date Langue LabVIEW Base 2 16 22-23.06.06 F FileMaker - niveau 1 16 26-27.06.06 F C++ Programming Part 3 - Templates and the STL (Standard Template Library) 16 27-28.06.06 E C++ Programming Part 4 - Exceptions 8 29.06.06 E FrontPage 2003 - niveau 1 16 29-30.06.06 F Manipulation des images 4 6.07.06 F Introduction to Databases and Database Design 16 11-12.07.06 E ACCESS 2003 - Level 1: ECDL 16 13-14.07.06 E-F Design Patterns 16 25-26.07.06 E Introduction à Dreamweaver MX 16 26-27.07.06 F ANSYS DesignModeler 16 29-30.08.06 F LabVIEW Basics 1 24 4-6.09.06 E ANSYS Workbench 32 12-15.09.06 F AutoCAD Mechanical 20...

  11. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 9.5.2006 (May-October course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: find out the curren Hours Date Language LabVIEW Application Development 24 15-17.05.06 E LabVIEW Advanced Programming 16 18-19.05.06 E PERL 5: Advanced Aspects 8 18.05.06 E Technique du vide 16 18-19.05.06 F FileMaker - niveau 2 16 11-12.05.06 F WORD 2003 - niveau 2 : ECDL 16 22-23.05.06 F Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE 16 23-24.05.06 F Comprehensive VHDL for FPGA Design 40 29.05-2.06.06 E C++ Programming Part 2 - Advanced C++ and its Traps and Pitfalls 32 30.05-2.06.06 E Python: Hands-on Introduction 24 7-9.06.06 E AutoCAD Mechanical 2006 16 13-14.06.06 F CERN EDMS for Local Administrators 16 13-14.06.06...

  12. Technical Training: Places Available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Technical Training Monique Duval - Tel.74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Oracle 9i: SQL: 17 - 19.5.2004 (3 days) Word 2003 - niveau 2 : 24 & 25.5.2004 (2 jours) EXCEL 2003 - niveau 1 : 27 & 28.5.2004 (2 jours) STEP7 Programming Level 1: 1 - 4.6.2004 (4 days) Oracle 9i : Programming with PL/SQL: 2 - 4.6.2004 (3 days) CST Microwave Studio: 3 & 4.6.2004 (2 days) Oracle 9i : New f...

  13. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. Technical Training Monique Duval - Tel.74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Word 2003 - niveau 2 : 24 & 25.5.2004 (2 jours) VisualEliteHDL : 25 & 26.5.2004 (2 days) EXCEL 2003 - niveau 1 : 27 & 28.5.2004 (2 jours) STEP7 Programming Level 1: 1 - 4.6.2004 (4 days) Oracle 9i : Programming with PL/SQL: 2 - 4.6.2004 (3 days) CST Microwave Studio: 3 & 4.6.2004 (2 days) Oracle 9...

  14. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Oracle 9i : New features for developers : 14 - 16.6.2004 (3 days) The Joint PVSS JCOP Framework: 14 - 18.6.2004 (5 days) Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE : 15 & 16.6.2004 (2 jours) EXCEL 2003 - niveau 2 : 17 & 18.6.2004 (2 jours) MAGNE-04 : Magnétisme pour l'électrotechnique : 6 au 8.7.2004 (3 jours) AutoCAD 2002 - niveau 1 : 13, 14, 23, 24.09.2004 (4 jours) ENSEIGNEMEN...

  15. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: C++ for Particle Physicists : 8 - 12.3.2004 (6 X 4-hour sessions) Introduction to the CERN EDMS : 9.3.2004 (1 day, free of charge) The EDMS MTF in Practice : 10.3.2004 (morning, free of charge) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon, free of charge) The CERN EDMS for Engineers : 11.3.2004 (1 day, free of charge) LabVIEW...

  16. Technical Training: Places available

    CERN Document Server

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Joint PVSS JCOP Programming : 9 - 13.8.2004 (5 days) Hands-on Introduction to Python Programming: 1 - 3.9.2004 (3 days - free course) Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE : 7 & 8.9.2004 (2 jours) Joint PVSS JCOP Programming : 13 - 17.9.2004 (5 days) AutoCAD 2002 - niveau 1 : 13, 14, 23, 24.9.2004 (4 jours) Programmation STEP7 niveau 1 : 14-17.9.2004 (4...

  17. Technical Training: Places available**

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The JAVA Programming Language Level 1 : 9 & 10.1.2004 (2 days) LabVIEW TestStand I (E) : 23 & 24.2.2004 (2 days) LabVIEW base 1 : 25 - 27.2.2004 (3 jours) CLEAN-2002 : Working in a Cleanroom : 10.3.2004 (afternoon - free of charge) C++ for Particle Physicists : 8 - 12.3.2004 ( 6 X 4-hour sessions) LabVIEW hands-on (E) 16.3...

  18. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training' form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Hands-on Introduction to Python Programming: 1 - 3.9.2004 (3 days - free course) Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE : 7 & 8.9.2004 (2 jours) AutoCAD 2002 - niveau 1 : 13, 14, 23, 24.9.2004 (4 jours) Programmation STEP7 niveau 1 : 14-17.9.2004 (4 jours) FrontPage 2003 - niveau 1 : 20 & 21.9.2004 (2 jours) Word 2003 - niveau 2 : 27 & 28.9.2004 (2 jours) Introduction à Wind...

  19. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Instructor-led WBTechT study or follow-up for Microsoft applications : 1.4.2004 (morning) FrontPage XP - niveau 1 : 5 & 6.4.2004 (2 jours) AutoCAD 2002 - niveau 1 : 19, 20.4 et 3, 4.5.2004 (4 jours) Oracle 8i/9i - Develop Web-based Applications with PL/SQL : 19 & 20.4.2004 (2 days) Introduction to ANSYS : 20 - 23.4.2004 (4 day...

  20. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Computational Electromagnetics with the ELEKTRA Module of OPERA-3D : 27 & 28.4.2004 (2 days) Hands-on Introduction to Python Programming : 3 - 5.5.2004 (3 days) LabVIEW Base 2 : 6 & 7.5.2004 (2 jours) Project Planning with MS-Project : 6 & 13.5.2004 (2 days) Word 2003 - niveau 1 : 10 & 11.5.2004 (2 jours) Oracle 9i : SQL : 10 - 12.5.2004 (3...

  1. Technical Training: Places available

    CERN Multimedia

    2004-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval tel. 74924 technical.training@cern.ch The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: AutoCAD 2002 - niveau 1 : 19, 20.4 et 3, 4.5.2004 (4 jours) Oracle 8i/9i - Develop Web-based Applications with PL/SQL : 19 & 20.4.2004 (2 days) Introduction to ANSYS : 20 - 23.4.2004 (4 days) LabVIEW Hands-on : 20.4.2004 (half-day, p.m.) FrontPage XP - niveau 2 : 26 & 27.4.2004 (2 jours) The Joint PVSS JCOP Framework : 26 -...

  2. TECHNICAL TRAINING: Places available**

    CERN Multimedia

    2003-01-01

    If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Officer). Applications will be accepted in the order of their receipt. TECHNICAL TRAINING Monique Duval Tel. 74924 technical.training@cern.ch ** The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The EDMS-MTF in practice (free of charge) : 28 -  30.10.03 (6 half-day sessions) AutoCAD 2002 – Level 1 : 3, 4, 12, 13.11.03 (4 days) LabVIEW TestStand ver. 3 : 4 & 5.11.03 (2 days) Introduction to PSpice : 4.11.03 p.m. (half-day) Hands-on Introduction to Python Programming : 12 – 14.11.03 (3 days) ACCESS ...

  3. Technical Training: Places available

    CERN Multimedia

    DAvide Vitè

    2006-01-01

    Places available as of 25.7.2006 (August-December course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Titre Heure Date Langue CERN EDMS for Local Administrators 16 1-2.08.06 E ANSYS DesignModeler 16 29-30.08.06 F EXCEL 2003 - niveau 1 : ECDL 16 30-31.08.06 F OUTLOOK 2003 (Short Course I) - E-mail 3 1.09.06 E/F OUTLOOK 2003 (Short Course II) - Calendar, Tasks and Notes 3 1.09.06 E/F CERN EDMS - Introduction 8 5.09.06 E CERN EDMS MTF en pratique 4 6.09.06 F ANSYS Workbench 32 12-15.09.06 F CERN EDMS for Engineers 8 12.09.06 E Software Engineering in the Small and the Large 16 12-13.09.06 E LabVIEW Basics 2 16 14-15.09.06 E WORD 2003 (Short Course III) - HowTo... Work with long documents 3 15.09.06 E/F EXCEL 2003 (Short Course I) - HowTo... Wor...

  4. Modeling and estimating system availability

    International Nuclear Information System (INIS)

    Gaver, D.P.; Chu, B.B.

    1976-11-01

    Mathematical models to infer the availability of various types of more or less complicated systems are described. The analyses presented are probabilistic in nature and consist of three parts: a presentation of various analytic models for availability; a means of deriving approximate probability limits on system availability; and a means of statistical inference of system availability from sparse data, using a jackknife procedure. Various low-order redundant systems are used as examples, but extension to more complex systems is not difficult

  5. High availability using virtualization

    International Nuclear Information System (INIS)

    Calzolari, Federico; Arezzini, Silvia; Ciampa, Alberto; Mazzoni, Enrico; Domenici, Andrea; Vaglini, Gigliola

    2010-01-01

    High availability has always been one of the main problems for a data center. Till now high availability was achieved by host per host redundancy, a highly expensive method in terms of hardware and human costs. A new approach to the problem can be offered by virtualization. Using virtualization, it is possible to achieve a redundancy system for all the services running on a data center. This new approach to high availability allows the running virtual machines to be distributed over a small number of servers, by exploiting the features of the virtualization layer: start, stop and move virtual machines between physical hosts. The 3RC system is based on a finite state machine, providing the possibility to restart each virtual machine over any physical host, or reinstall it from scratch. A complete infrastructure has been developed to install operating system and middleware in a few minutes. To virtualize the main servers of a data center, a new procedure has been developed to migrate physical to virtual hosts. The whole Grid data center SNS-PISA is running at the moment in virtual environment under the high availability system.

  6. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 27.6.2006 (July-December course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Titre Heure Date Langue Manipulation des images 4 6.07.06 F Introduction to Databases and Database Design 16 11-12.07.06 E ACCESS 2003 - Level 1: ECDL 16 13-14.07.06 E-F Design Patterns 16 25-26.07.06 E CERN EDMS for Local Administrators 16 1-2.08.06 E ANSYS DesignModeler 16 29-30.08.06 F CERN EDMS - Introduction 8 5.09.06 E CERN EDMS MTF en pratique 4 6.09.06 F LabVIEW Basics 1 24 4-6.09.06 E ANSYS Workbench 32 12-15.09.06 F AutoCAD Mechanical 2006 16 12-13.09.06 F CERN EDMS for Engineers 8 12.09.06 E Software Engineering in the Small and the Large 16 12-13.09.06 E AutoCAD 2006 - niveau 1 32 14-21.09.06 F LabVIEW Basics 2 ...

  7. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 11.7.2006 (July-December course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Titre Heure Date Langue Design Patterns 16 25-26.07.06 E CERN EDMS for Local Administrators 16 1-2.08.06 E ANSYS DesignModeler 16 29-30.08.06 F CERN EDMS – Introduction 8 5.09.06 E CERN EDMS MTF en pratique 4 6.09.06 F LabVIEW Basics 1 24 4-6.09.06 E ANSYS Workbench 32 12-15.09.06 F AutoCAD Mechanical 2006 16 12-13.09.06 F CERN EDMS for Engineers 8 12.09.06 E Software Engineering in the Small and the Large 16 12-13.09.06 E LabVIEW Basics 2 16 14-15.09.06 E LabVIEW: Working efficiently with LabWIEW 8 8 18.09.06 E PCAD Schémas ? Introduction 16 21-22.09.06 F PCAD PCB - Introduction  24 27-29.09.06 F C++ for Particle Physicists ...

  8. Technical Training: Places available

    CERN Multimedia

    2006-01-01

    Places available as of 21.3.2006 (March-October course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: find out the curren Hours Date Language ACROBAT 7.0 : Utilisation de fichiers PDF 8 8.05.06 F Project Planning with MS-Project 16 9.05-6.06.06 E STEP7: niveau 1 32 9-12.05.06 E-F Oracle: Programming with PL/SQL 24 10-12.05.06 E FileMaker - niveau 2 16 11-12.05.06 F LabVIEW Application Development 24 15-17.05.06 E LabVIEW Advanced Programming 16 18-19.05.06 E PERL 5: Advanced Aspects 8 18.05.06 E Technique du vide 16 18-19.05.06 F WORD 2003 - niveau 2 : ECDL 16 22-23.05.06 F Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE 16 23-24.05.06 F Comprehensive VHDL for FPGA Design 40 29.05-2.06.06 E C++ Programming Part 2 - Advanced C++ and its T...

  9. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 19.7.2006 (August-December course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Titre Heure Date Langue CERN EDMS for Local Administrators 16 1-2.08.06 E ANSYS DesignModeler 16 29-30.08.06 F OUTLOOK 2003 (Short Course I) - E-mail 3 1.09.06 E/F OUTLOOK 2003 (Short Course II) - Calendar, Tasks and Notes 3 1.09.06 E/F CERN EDMS - Introduction 8 5.09.06 E CERN EDMS MTF en pratique 4 6.09.06 F LabVIEW Basics 1 24 11-13.09.06 E ANSYS Workbench 32 12-15.09.06 F CERN EDMS for Engineers 8 12.09.06 E Software Engineering in the Small and the Large 16 12-13.09.06 E LabVIEW Basics 2 16 14-15.09.06 E EXCEL 2003 (Short Course I) - HowTo... Work with formulae 3 15.09.06 E/F WORD 2003 (Short Course III) - HowTo... Work with long docu...

  10. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 21.3.2006 (March-October course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Title Hours Date Language FrontPage 2003 - niveau 1 16 27-28.03.06 F Oracle Forms Developer 10g: Move to the Web 16 27-28.03.06 E ACCESS 2003 - Level 2: ECDL AM5 16 3-4.03.06 E-F JAVA 2 Enterprise Edition - Part 1: Web Applications 16 3-4.04.06 E JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans 24 5-7.04.06 E AutoCAD Mechanical 2006 16 11-12.04.06 F FrontPage 2003 - niveau 2 16 24-25.04.06 F C++ Programming Part 1 - Introduction to Object-Oriented Design and Programming 24 25-27.04.06 E AutoCAD 2006 - niveau 1 32 27.04-4.05.06 F Oracle: SQL 24 3-5.05.06 E EXCEL 2003 (Short Course I) - HowTo... Work with formulae 3 4.05.06 (am) E-F EXCEL 2003 (Short Course II) - HowTo... Format your worksheet for printing 3 4...

  11. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 7.2.2006 (February-May course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Title Hours Date Language WORD 2003 (Short Course II) - HowTo... Mail merge 3 13.03.06 E-F EXCEL 2003 (Short Course III) - HowTo... Pivot tables 3 20.03.06 E-F EXCEL 2003 (Short Course IV) - HowTo....Link cells, worksheets and workbooks 3 20.03.06 E-F Object-Oriented Analysis and Design using UML 24 21-23.03.06 E EXCEL 2003 - niveau 1 16 22-23.03.06 F FrontPage 2003 - niveau 1 16 27-28.03.06 F Oracle Forms Developer 10g: Move to the Web 16 27-28.03.06 E Oracle JDeveloper 10g: Build Applications with ADF 24 29-31.03.06 E ACCESS 2003 - Level 2: ECDL AM5 16 3-4.03.06 E-F JAVA 2 Enterprise Edition - Part 1: Web Applications 16 3-4.04.06 E JCOP: Control System Integration using JCOP Tools 24 4-6.04.06 E JAVA 2 Enterprise Edition...

  12. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 7.2.2006 (February-May course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Title Hours Date Language WORD 2003 (Short Course IV) - HowTo... Work with master document 3 27.02.06 E-F JAVA: Level 2 32 28.02-3.03.06 E Manipulation des images 4 28.02.06 F ACCESS 2003 - Level 2: ECDL AM5 16 2-3.03.06 E-F C++ for Particle Physicists 20 6-10.03.06 E PowerPoint 2003 8 9.03.06 F JCOP: Control System Integration using JCOP Tools 24 14-16.03.06 E EXCEL 2003 (Short Course III) - HowTo... Pivot tables 3 20.03.06 E-F EXCEL 2003 (Short Course IV) - HowTo....Link cells, worksheets and workbooks 3 20.03.06 E-F JCOP: Finite State Machines in the JCOP Framework 24 21-23.03.06 E Object-Oriented Analysis and Design using UML 24 21-23.03.06 E FrontPage 2003 - niveau 1 16 27-28.03.06 F JCOP: Joint PVSS-JCOP Fram...

  13. High Availability in Optical Networks

    Science.gov (United States)

    Grover, Wayne D.; Wosinska, Lena; Fumagalli, Andrea

    2005-09-01

    Call for Papers: High Availability in Optical Networks Submission Deadline: 1 January 2006 The Journal of Optical Networking (JON) is soliciting papers for a feature Issue pertaining to all aspects of reliable components and systems for optical networks and concepts, techniques, and experience leading to high availability of services provided by optical networks. Most nations now recognize that telecommunications in all its forms -- including voice, Internet, video, and so on -- are "critical infrastructure" for the society, commerce, government, and education. Yet all these services and applications are almost completely dependent on optical networks for their realization. "Always on" or apparently unbreakable communications connectivity is the expectation from most users and for some services is the actual requirement as well. Achieving the desired level of availability of services, and doing so with some elegance and efficiency, is a meritorious goal for current researchers. This requires development and use of high-reliability components and subsystems, but also concepts for active reconfiguration and capacity planning leading to high availability of service through unseen fast-acting survivability mechanisms. The feature issue is also intended to reflect some of the most important current directions and objectives in optical networking research, which include the aspects of integrated design and operation of multilevel survivability and realization of multiple Quality-of-Protection service classes. Dynamic survivable service provisioning, or batch re-provisioning is an important current theme, as well as methods that achieve high availability at far less investment in spare capacity than required by brute force service path duplication or 100% redundant rings, which is still the surprisingly prevalent practice. Papers of several types are envisioned in the feature issue, including outlook and forecasting types of treatments, optimization and analysis, new

  14. [Currently available skin substitutes].

    Science.gov (United States)

    Oravcová, Darina; Koller, Ján

    2014-01-01

    The current trend of burn wound care has shifted to more holistic approach of improvement in the long-term form and function of the healed burn wounds and quality of life. Autologous split or full-thickness skin graft are the best definitive burn wound coverage, but it is constrained by the limited available sources, especially in major burns. Donor site morbidities in term of additional wounds and scarring are also of concern of the autograft application. This has demanded the emergence of various skin substitutes in the management of acute burn injury as well as post burn reconstructions. This paper reviews currently available skin substitutes, produced in not for-profit skin banks as well as commercially available. They are divided according to type of material included, as biological, biosynthetic and synthetic and named respectively.

  15. MongoDB high availability

    CERN Document Server

    Mehrabani, Afshin

    2014-01-01

    This book has a perfect balance of concepts and their practical implementation along with solutions to make a highly available MongoDB server with clear instructions and guidance. If you are using MongoDB in a production environment and need a solution to make a highly available MongoDB server, this book is ideal for you. Familiarity with MongoDB is expected so that you understand the content of this book.

  16. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    Places available as of 7.2.2006 (February-May course sessions) The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Title Hours Date Language WORD 2003 (Short Course II) - HowTo... Mail merge 3 09-02-06 E-F ACCESS 2003 - Level 1: ECDL M5 16 13 to 14-02-06 E-F OUTLOOK 2003 (Short Course II) - Calendar, Tasks and Notes 3 16-02-06 E-F WORD 2003 (Short Course III) - HowTo... Work with long documents 3 16-02-06 E-F CERN EDMS - Introduction 8 21.02.06 E OUTLOOK 2003 (Short Course III) - Meetings and Delegation 3 27-02-06 E-F WORD 2003 (Short Course IV) - HowTo... Work with master document 3 27-02-06 E-F JAVA: Level 2 32 28-02-06 to 03-03-06 E Manipulation des images 4 28.02.06 F ACCESS 2003 - Level 2: ECDL AM5 16 02 to 03-03-06 E-F FrontPage 2003 - niveau 2 16 02 to 03-03-06 F C++ for Particle Physicists 20 06 to 10-03-06 E FileMaker - niv...

  17. Session 2: Availability

    CERN Document Server

    Uythoven, J

    2012-01-01

    This session concentrated on the main players affecting the availability of the LHC: the Quench Protection System (QPS), the cryogenics system, the regularly foreseen technical stops and the effect of radiation on equipment failures. A forecast for operation in 2012 was made for all these items.

  18. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: LabVIEW Intermediate I : 8 - 10.11.2004 (3 days) Instructor-led WTechT Study or Follow-up for Microsoft Applications : 9.11.2004 (morning) Hands-On Object Oriented Design and Programming with C++ : 9 - 11.11.2004 (3 days) Outlook (Short Course III) : Meetings and Delegation : 9.11.2004 (2 hours, afternoon) LabVIEW Intermediate II : 11 & 12.11.2004 (2 days) AutoCAD 2002 - niveau 1 : 11, 12, 18, 19.11.2004 (4 jours) C++ for Particle Physicists : 15 - 19.11.2004 (6 X 3 hours sessions) Word 2003 - niveau 1 : 22 & 23.11.2004 (2 jours) Introduction à ANSYS : 23 - 26.11.2004 (4 jours) CLEAN-2002 - Travailler en salle propre : 23.11.2004 (après-midi, cours gratuit) Project Planning with MS-Project : 25.11 & 2.12.2004 (2 days) ENSEIGNEMENT ...

  19. Technical training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: LabVIEW Intermediate I : 8 - 10.11.2004 (3 days) Instructor-led WTechT Study or Follow-up for Microsoft Applications : 9.11.2004 (morning) Outlook (Short Course III) : Meetings and Delegation : 9.11.2004 (2 hours, afternoon) LabVIEW Intermediate II : 11 & 12.11.2004 (2 days) AutoCAD 2002 - niveau 1 : 11, 12, 18, 19.11.2004 (4 jours) C++ for Particle Physicists : 15 - 19.11.2004 (6 X 3 hours sessions) Word 2003 - niveau 1 : 22 & 23.11.2004 (2 jours) Introduction à ANSYS : 23 - 26.11.2004 (4 jours) Project Planning with MS-Project : 25.11 & 2.12.2004 (2 days) Introduction to PERL 5 : 8 & 9.12.2004 (2 days) Advanced aspects of PERL 5 : 10.12.2004 (1 day) The JAVA Programming Language Level 1 : 11 & 12.1.2005 (2 days) Introduction...

  20. Resources available in society

    International Nuclear Information System (INIS)

    Berg, S.E.

    1997-01-01

    A decontamination operation will only be successful if cost-efficient methods are used. The cost-effectiveness depends, among many other factors, including the qualifications and training of the personnel and the capability of the equipment. The personnel must be able to handle the equipment in a professional way and should also know how to protect themselves. To fulfil these requirements they need courses in radiation protection. The equipment must be suitable for the selected countermeasure. Societies planning and preparedness for reclamation should meet realistic demands for early actions and outline a cost-effective strategy that implies reasonable use of personnel and equipment resources. Planning for early cleanup actions is different from that of long term planning with respect to the available time and quantity and quality of available information on which to base decisions. Available resources vary, of course, between the Nordic countries, but in all countries there are organisations with both knowledgeable staff and suitable equipment accessible for decontamination operations. (EG)

  1. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: LabVIEW Intermediate I : 8 - 10.11.2004 (3 days) Instructor-led WTechT Study or Follow-up for Microsoft Applications : 9.11.2004 (morning) Hands-On Object Oriented Design and Programming with C++ : 9 - 11.11.2004 (3 days) Outlook (Short Course III) : Meetings and Delegation : 9.11.2004 (2 hours, afternoon) LabVIEW Intermediate II : 11 & 12.11.2004 (2 days) AutoCAD 2002 - niveau 1 : 11, 12, 18, 19.11.2004 (4 jours) C++ for Particle Physicists : 15 - 19.11.2004 (6 X 3 hours sessions) Word 2003 - niveau 1 : 22 & 23.11.2004 (2 jours) Introduction à ANSYS : 23 - 26.11.2004 (4 jours) CLEAN-2002 - Travailler en salle propre : 23.11.2004 (après-midi, cours gratuit) Project Planning with MS-Project : 25.11 & 2.12.2004 (2 days) PCAD Sch&eac...

  2. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The JAVA Programming Language Level 1: 11 & 12.1.2005 (2 days) Introduction to XML : 13 & 14.1.2005 (2 days) ELEC-2005.:Winter term: Introduction to electronics in HEP: 18, 20, 25, 27.1, 1 & 3.2.2005 (6 x 2h lectures) The CERN EDMS for Local Administrators: 19 & 20.1.2005 (2 days - free course) Programmation Unity-Pro pour utilisateurs de Schneider PL7-Pro : 24 - 28.1.2005 (8 demi-journées) CLEAN-2002 : Travailler en salle propre : 25.1.2005 (après-midi, cours gratuit) Compatibilité électromagnétique (CEM) : installation et remèdes : 25 - 27.1.2005 (3 jours) Finite State Machines in the JCOP Framework: 1 - 3.2.2005 (3 days - free course) The JAVA Programming Language Level 2: 7 - 9...

  3. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Introduction à ANSYS : 23 - 26.11.2004 (4 jours) FileMaker - niveau 1 : 23 - 26.11.2004 (4 jours) Project Planning with MS-Project : 25.11 & 2.12.2004 (2 days) Explicit Dynamics with ANSYS/LS-Dyna : 7 - 9.12.2004 (3 days) Introduction to PERL 5 : 8 & 9.12.2004 (2 days) PCAD Schémas - Débutants : 9 & 10.12.2004 (2 jours) The JAVA Programming Language Level 1 : 11 & 12.1.2005 (2 days) Introduction to XML : 13 & 14.1.2005 (2 days) Introduction to the CERN EDMS : 18.1.2005 (1 day - free course) The CERN EDMS for Local Administrators : 19 & 20.1.2005 (2 days - free course) Programmation Unity-Pro pour utilisateurs de Schneider PL7-Pro : 24 - 28.1.2005 (8 demi-journées) CLEAN-2002 : Travaill...

  4. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Explicit Dynamics with ANSYS/LS-Dyna : 7 - 9.12.2004 (3 days) Introduction to PERL 5 : 8 & 9.12.2004 (2 days) PCAD Schémas - Débutants : 9 & 10.12.2004 (2 jours) Advanced aspects of PERL 5: 10.12.2004 (1 day) PCAD PCB – Débutants : 13 - 15.12.2004 (3 jours) The JAVA Programming Language Level 1 : 11 & 12.1.2005 (2 days) Introduction to XML : 13 & 14.1.2005 (2 days) Introduction to the CERN EDMS : 18.1.2005 (1 day - free course) The CERN EDMS for Local Administrators : 19 & 20.1.2005 (2 days - free course) Programmation Unity-Pro pour utilisateurs de Schneider PL7-Pro : 24 - 28.1.2005 (8 demi-journées) CLEAN-2002 : Travailler en salle propre : 25.1.2005 (après-midi, cours gratuit) Compatibilit&eac...

  5. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: FileMaker - niveau 1 : 23 - 26.11.2004 (4 jours) Explicit Dynamics with ANSYS/LS-Dyna : 7 - 9.12.2004 (3 days) Introduction to PERL 5 : 8 & 9.12.2004 (2 days) PCAD Schémas - Débutants : 9 & 10.12.2004 (2 jours) Advanced aspects of PERL 5: 10.12.2004 (1 day) PCAD PCB – Débutants : 13 - 15.12.2004 (3 jours) The JAVA Programming Language Level 1 : 11 & 12.1.2005 (2 days) Introduction to XML : 13 & 14.1.2005 (2 days) Introduction to the CERN EDMS : 18.1.2005 (1 day - free course) The CERN EDMS for Local Administrators : 19 & 20.1.2005 (2 days - free course) Programmation Unity-Pro pour utilisateurs de Schneider PL7-Pro : 24 - 28.1.2005 (8 demi-journées) CLEAN-2002 : Travailler en salle propre : 25.1.2005 ...

  6. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: C++ for Particle Physicists : 15 - 19.11.2004 (6 X 3 hours sessions) Word 2003 - niveau 1 : 22 & 23.11.2004 (2 jours) Introduction à ANSYS : 23 - 26.11.2004 (4 jours) Project Planning with MS-Project : 25.11 & 2.12.2004 (2 days) Explicit Dynamics with ANSYS/LS-Dyna : 7 - 9.12.2004 (2 days) PCAD Schémas - Débutants : 9 & 10.12.2004 (2 jours) The JAVA Programming Language Level 1 : 11 & 12.1.2005 (2 days) Introduction to XML : 13 & 14.1.2005 (2 days) CLEAN-2002 : Travailler en salle propre : 25.1.2005 (après-midi, cours gratuit) Compatibilité électromagnétique (CEM) : installation et remèdes : 25 - 27.1.2005 (3 jours) Finite State Machines in the JCOP Fr ...

  7. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Joint PVSS JCOP Framework: 8 - 12.8.2005 (5 days) FrontPage 2003 - niveau 1 : 1 - 2.9.2005 (2 jours) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.9.2005 (1 jour) LabVIEW Basics 1 : 5 - 7.9.2005 (3 days, dates to be confirmed) Introduction à Windows XP au CERN : 12.9.2005 (1 demi-journée) FrontPage 2003 - niveau 2 : 15 - 16.9.2005 (2 jours) AutoCAD 2005 - niveau 1 : 22, 23, 28, 29.9.2005 (4 jours) MAGNE-05 - Magnétisme pour l'électrotechnique : 27 - 29.9.2005 (3 jours) LabVIEW Application Development (Intermediate I): 5 - 7.12.2005 (3 days) LabVIEW Advanced Programming (Intermediate 2): 8 - 9.12.2005 (2 days) ENSEIGNEMENT TECHNIQUE TECHNICAL TRAINING Monique Duval 74924 technical.training@cern.ch

  8. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: LabVIEW - Basics 2 : 30.9 & 1.10.2004 (2 days) Introduction à Windows XP au CERN : 4.10.2004 (matin) The EDMS MTF in practice : 4.10.2004 (afternoon) The CERN EDMS for Engineers : 6.10.2004 (1 day) FrontPage 2003 - niveau 1 : 7 & 8.10.04 (2 jours) Hands-On Object Oriented Design and Programming with C++ : 9 - 12.11.2004 (3 days) FileMaker - niveau 1 : 18 & 19.10.2004 (2 jours) Outlook (short course I) : E-mail : 22.10.2004 (2 hours, morning) Outlook (short course II) : Calendar, Tasks and Notes: 22.10.2004 (2 hours, afternoon) Excel 2003 - niveau 1 : 4 & 5.11.2004 (2 jours) Instructor-led WTechT Study or Follow-up for Microsoft Applications : 9.11.2004 (morning) Outlook (Short Course III) : Meetings and Delegation : 9.11...

  9. Technical training - Places available

    CERN Multimedia

    2003-01-01

    * Etant donné le délai d'impression du Bulletin, ces places peuvent ne plus être disponibles au moment de sa parution. Veuillez consulter notre site Web pour avoir la dernière mise à jour. ** The number of places available may vary. Please check our Web site to find out the current availability. Des places sont disponibles dans les cours suivants : Places are available in the following courses: Hands-on Introduction to Python Programming 12 – 14.11.03 (3 days) ACCESS 2000 – niveau 1 13 & 14.11.03 (2 jours) C++ for Particle Physicists 17 – 21.11.03 (6 x 3-hour lectures) Programmation automate Schneider TSX Premium – niveau 2  18 – 21.11.03 (4 jours) Planification de projet avec MS-Project/Project Planning with MS-Project (gratuit/free of charge – langue à définir/language to be defined) : 18 & 25.11.03 (2 jours/2 days) JAVA 2 Enterprise Edition – Part 1 : WEB...

  10. Fuel and heavy water availability

    International Nuclear Information System (INIS)

    1980-01-01

    The general guidelines for the Working Group's evaluation of the availability of nuclear fuel and heavy water were set at the Organizing Conference of the International Nuclear Fuel Cycle Evaluation (INFCE), which was held in Washington, United States of America, 19-21 October 1977. The agreed technical and economic scope for the evaluation was to: (1) Estimate needs for nuclear energy and correlated needs for uranium and heavy water according to different fuel cycle strategies; (2) Review uranium availability with specific regard to: Assessment of resources and production capacities; policies and incentives for encouraging exploration and production including joint ventures; marketing policies and/or guarantees of sales for companies investing in exploration and production; marketing policies and/or guarantees of supply for utilities; technical development of exploration, mining and milling methods; (3) Review heavy water availability; (4) Review thorium availability; (5) Consider special needs of developing countries. The illustrations of availability and requirements developed in this report do provide a useful framework for considering future options and alternatives for the development of nuclear power

  11. APFO Historical Availability of Imagery

    Data.gov (United States)

    Farm Service Agency, Department of Agriculture — The APFO Historical Availability ArcGIS Online web map provides an easy to use reference of what historical imagery is available by county from the Aerial...

  12. Energy availability in athletes

    DEFF Research Database (Denmark)

    Loucks, Anne B; Kiens, Bente; Wright, Hattie H

    2011-01-01

    Abstract This review updates and complements the review of energy balance and body composition in the Proceedings of the 2003 IOC Consensus Conference on Sports Nutrition. It argues that the concept of energy availability is more useful than the concept of energy balance for managing the diets...... of athletes. It then summarizes recent reports of the existence, aetiologies, and clinical consequences of low energy availability in athletes. This is followed by a review of recent research on the failure of appetite to increase ad libitum energy intake in compensation for exercise energy expenditure...

  13. Simulation bounds for system availability

    International Nuclear Information System (INIS)

    Tietjen, G.L.; Waller, R.A.

    1976-01-01

    System availability is a dominant factor in the practicality of nuclear power electrical generating plants. A proposed model for obtaining either lower bounds or interval estimates on availability uses observed data on ''n'' failure-to-repair cycles of the system to estimate the parameters in the time-to-failure and time-to-repair models. These estimates are then used in simulating failure/repair cycles of the system. The availability estimate is obtained for each of 5000 samples of ''n'' failure/repair cycles to form a distribution of estimates. Specific percentile points of those simulated distributions are selected as lower simulation bounds or simulation interval bounds for the system availability. The method is illustrated with operational data from two nuclear plants for which an exponential time-to-failure and a lognormal time-to-repair are assumed

  14. 75 FR 33324 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2009...

    Science.gov (United States)

    2010-06-11

    ... requirements established by HUD's Fiscal Year 2009 Notice of Funding Availability (NOFA) Policy Requirements... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5419-N-01] Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2009; Brownfields Economic Development...

  15. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Joint PVSS JCOP Framework: 8 - 12.8.2005 (5 days) WORD 2003 (Short Course I) - HowTo... Work with AutoTasks (AutoText, AutoFormat, AutoCorrect, Lists, Find/Replace): 25.8.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 25.8.2005 (afternoon) EXCEL 2003 (Short Course I) - HowTo... Work with formulae: 26.8.2005 (morning) WORD 2003 (Short Course III) - HowTo... Work with long documents: 26.8.2005 (afternoon) FrontPage 2003 - niveau 1 : 1 - 2.9.2005 (2 jours) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.9.2005 (1 jour) LabVIEW Basics 1 : 5 - 7.9.2005 (3 days, dates to be confirmed) Introduction à Windows XP au CERN : 12.9.2005 (1 demi-journée) FrontPage 2003 - niveau 2 : 15 - 16.9.2005 (2 jours) AutoCAD 2005 - niveau 1 : 22, 23, 28, 29.9.2005 (4 jours) MAGNE-05 - Magn&...

  16. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Hands-on Object-Oriented Design and Programming with C++ : 22 - 24.3.2005 (3 days) FileMaker - niveau 2 : 4 & 5.4.2005 (2 jours) EMAG-2004 - Electromagnetic Design and Mathematical Optimization in Magnet Technology: 4- 14.4.2005 (8 x 3h) EXCEL 2003 - niveau 2 : 11 & 12.4.2005 (2 jours) LabVIEW Intermediate 1: 11 - 13.4.2005 (3 days) ACCESS 2003 - Level 2 - ECDL AM5: 13 & 14.4.2005 (2 days) LabVIEW Intermediate 2: 14 & 15.4.2005 (2 days) PowerPoint 2003 (F) : 18.4.2005 (1 jour) Joint PVSS JCOP Framework : 25 - 29.4.2005 (5 days) WORD 2003 - niveau 1 : 2 & 3.5.2005 (2 jours) ELEC-2005 - Summer Term: System electronics for physics - Issues : 10, 12, 17, 19, 24, 26 & 31.5.2005 (7 x 2h lectures) AutoCAD 2002 - niveau 1 : 11, 12, 18 & 19.5.2005 (4 jour...

  17. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: The Java Programming Language Level 1: 21 - 23.11.2005 (3 days) OUTLOOK (Short Course III) - Meetings and Delegation: 30.11.2005 (morning) WORD 2003 (Short Course III) - HowTo... Work with long documents : 30.11.2005 (afternoon) FrontPage 2003 - niveau 2 : 5 - 6.12.2005 (2 jours) Introduction à ANSYS Classique : 6 - 9.12.2005 (4 jours) EXCEL 2003 (Short Course II) - HowTo... Format your worksheet for printing: 7.12.2005 (morning) PCAD Schémas - Introduction : 8 - 9.12.2005 (2 jours) ACCESS 2003 - Level 2 - ECDL AM5: 14 - 15.12.2005 (2 days) LabVIEW Basics I:  23 - 25.1.2006 (3 days) C++ Programming Advanced - Traps and Pitfalls: 24 - 27.1.2006 (4 days) LabVIEW Basics II:  26 - 27.1.2006 (2 days) Joint PVSS-JCOP Framework: 30.1 - 3.2.2006 (5 days, free of charge) Finite State Machines in the JCOP Framework : ...

  18. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: ACCESS 2003 - Level 1 - ECDL M5: 24 - 25.10.2005 (2 days) Finite State Machines in the JCOP Framework : 25 - 27.10.2005 (3 days) EXCEL 2003 (Short Course III) - HowTo... Pivot tables: 26.10.2005 (morning) Introduction to the CERN EDMS: 2.11.2005 (1 day, free of charge) OUTLOOK (Short Course I) - E-mail: 2.11.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 2.11.2005 (afternoon) FrontPage 2003 - niveau 1 :  3 - 4.11.2005 (2 jours) AutoCAD 2006 - niveau 1 : 3, 4, 9, 10.11.2005 (4 jours) Joint PVSS JCOP Framework : 7 - 11.11.2005 (5 days) The CERN EDMS for Engineers: 8.11.2005 (1 day, free of charge) The EDMS-MTF in practice: 9.11.2005 (morning, free of charge) The CERN EDMS for Local Administrators: 15-16.11.2005 (2 days, free of charge) OUTLOOK (Short Course II) - Calendar, Tasks and Notes: ...

  19. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: OUTLOOK (Short Course III) - Meetings and Delegation: 30.11.2005 (morning) WORD 2003 (Short Course III) - HowTo... Work with long documents: 30.11.2005 (afternoon) FrontPage 2003 - niveau 2 : 5 - 6.12.2005 (2 jours) Introduction à ANSYS Classique : 6 - 9.12.2005 (4 jours) EXCEL 2003 (Short Course II) - HowTo... Format your worksheet for printing: 7.12.2005 (morning) AutoCAD - mise à jour d’AutoCAD 2002 à AutoCAD 2006 : 8.12.2005 (1 journée - pour les utilisateurs d’AutoCAD 2002) PCAD Schémas - Introduction : 8 - 9.12.2005 (2 jours) Finite State Machines in the JCOP Framework: 13 - 15.12.2005 (3 days) PCAD PCB - Introduction : 14 - 16.12.2005 (3 jours) ACCESS 2003 - Level 2 - ECDL AM5: 14 - 15.12.2005 (2 days) AutoCAD 2006 - niveau 1 : 19, 20, 24 & 25.1.2006 (4 jours) LabVIEW Basics I:  23 - 25.1.2006...

  20. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Utilisation des fichiers PDF avec ACROBAT 6.0 : 1.3.2005 (1 journée) ELEC-2005 - Spring Term: Integrated circuits and VLSI technology for physics: 1 - 17.3.2005 (6 x 2.5-hour lectures) C++ for Particle Physicists: 7 - 11.3.2005 (6 x 3-hour lectures) Joint PVSS JCOP Framework : 14 - 18.3.2005 (5 days) AXEL-2005; Introduction to Particle Accelerators : 14- 18.3.2005 (10 x 1 h lectures) ACCESS 2003 - Level 1: ECDL M5: 15 - 16.3.2005 (2 days) AutoCAD 2002 - niveau 1 : 15, 16, 21& 22.3.2005 (4 jours) FrontPage 2003 - niveau 2 : 21 & 22.3.2005 (2 jours) Hands-on Object-Oriented Design and Programming with C++ : 22 - 24.3.2005 (3 days) FileMaker - niveau 2 : 4 & 5.4.2005 (2 jours) EXCEL 2003 - niveau 2 : 11 & 12.4.2005 (2 jours) LabVIEW Intermediate 1: 11 - 13.4.2005...

  1. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: JAVA 2 Enterprise Edition - Part 1: WEB Applications: 21 & 22.2.2005 (2 days) FrontPage 2003 - niveau 1 : 21 & 22.2.2005 (2 jours) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 23 - 25.2.2005 (3 days) Utilisation des fichiers PDF avec ACROBAT 6.0 : 1.3.2005 (1 journée) Hands-on Object-Oriented Design and Programming with C++ : 1 - 3.3.2005 (3 days) ELEC-2005 - Spring Term: Integrated circuits and VLSI technology for physics: 1 - 17.3.2005 (6 x 2.5-hour lectures) C++ for Particle Physicists: 7 - 11.3.2005 (6 x 3-hour lectures) Joint PVSS JCOP Framework : 14 - 18.3.2005 (5 days) ACCESS 2003 - Level 1 : 15 - 16.3.2005 (2 days) AutoCAD 2002 - niveau 1 : 15, 16, 21& 22.3.2005 (4 jours) FrontPage 2003 - niveau 2 : 21 & 22.3.2005 (2 jours) FileMaker - ...

  2. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: FrontPage 2003 - niveau 1 : 9 & 10.5.2005 (2 jours) ELEC-2005 - Summer Term: System electronics for physics - Issues : 10, 12, 17, 19, 24, 26 & 31.5.2005 (7 x 2h lectures) AutoCAD 2005 - niveau 1 : 11, 12, 18, 19.5.2005 (4 jours) Object-Oriented Analysis and Design using UML: 17 - 19.5.2005 (3 days) Synplify Pro Training: 18.5.2005 (1 day) Finite State Machines in the JCOP Framework: 24 - 26.5.2005 (3 days) The Joint PVSS JCOP Framework: 30.5 - 3.6.2005 (5 days) Introduction à la CAO CADENCE : 31.5 - 1.6.2005 (2 jours) LabVIEW Real-Time (F) : 7 - 9.6.2005 (3 jours) LabVIEW Migration 6 to 7: 14.6.2005 (1 day) FrontPage 2003 - niveau 2 : 16 & 17.6.2005 (2 jours) Utilisation de fichiers PDF avec ACROBAT 6.0 : 20.6.2005 (1journée) Introductio...

  3. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The JAVA Programming Language Level 1: 11 & 12.1.2005 (2 days) Introduction to XML : 13 & 14.1.2005 (2 days) The CERN EDMS for Local Administrators: 19 & 20.1.2005 (2 days - free course) Programmation Unity-Pro pour utilisateurs de Schneider PL7-Pro : 24 - 28.1.2005 (8 demi-journées) LabVIEW base 1/basics 1 : 31.1 - 1.2.2005 (2 j size="2">LabVIEW base 2/basics 2 : 3 & 4.2.2005 (2 jours/2 days - langue à décider/language to be decided) Finite State Machines in the JCOP Framework: 1 - 3.2.2005 (3 days - free course) The JAVA Programming Language Level 2: 7 - 9.2.2005 (3 days) C++ Programming Advanced -Traps and Pitfalls: 8 - 11.2.2005 (4 days) Joint PVSS JCOP Framework: 14 - 18.2.2005 (5 days) JAVA 2 Enterprise Edition - Part 1: ...

  4. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: FileMaker - niveau 1 :  20 - 21.10.2005 (2 jours) ACCESS 2003 - Level 1 - ECDL M5: 24 - 25.10.2005 (2 days) Finite State Machines in the JCOP Framework : 25 - 27.10.2005 (3 days) EXCEL 2003 (Short Course III) - HowTo... Pivot tables: 26.10.2005 (morning) WORD 2003 (Short Course I) - HowTo... Work with AutoTasks: 26.10.2005 (afternoon) OUTLOOK (Short Course I) - E-mail: 2.11.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 2.11.2005 (afternoon) FrontPage 2003 - niveau 1 :  3 - 4.11.2005 (2 jours) AutoCAD 2006 - niveau 1 : 3, 4, 9, 10.11.2005 (4 jours) Joint PVSS JCOP Framework : 7 - 11.11.2005 (5 days) OUTLOOK (Short Course II) - Calendar, Tasks and Notes: 16.11.2005 (morning) Joint PVSS JCOP Framework : 21 - 25.11.2005 (5 days) OUTLOOK (Short Course III) - Meetings and Delegation: 30.11....

  5. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: FileMaker - niveau 1 :  20 - 21.10.2005 (2 jours) ACCESS 2003 - Level 1 - ECDL M5: 24 - 25.10.2005 (2 days) Finite State Machines in the JCOP Framework : 25 - 27.10.2005 (3 days) EXCEL 2003 (Short Course III) - HowTo... Pivot tables: 26.10.2005 (morning) OUTLOOK (Short Course I) - E-mail: 2.11.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 2.11.2005 (afternoon) FrontPage 2003 - niveau 1 :  3 - 4.11.2005 (2 jours) AutoCAD 2006 - niveau 1 : 3, 4, 9, 10.11.2005 (4 jours) Joint PVSS JCOP Framework : 7 - 11.11.2005 (5 days) OUTLOOK (Short Course II) - Calendar, Tasks and Notes: 16.11.2005 (morning) Joint PVSS JCOP Framework : 21 - 25.11.2005 (5 days) OUTLOOK (Short Course III) - Meetings and Delegation: 30.11.2005 (morning) WORD 2003 (Short Course III) - HowTo... Work with long documents : ...

  6. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: LabVIEW base 1/basics 1 : 31.1 - 2.2.2005 (3 jours/3 days - langue à décider/language to be decided) LabVIEW base 2/basics 2 : 3 & 4.2.2005 (2 jours/2 days - langue à décider/language to be decided) Finite State Machines in the JCOP Framework: 1 - 3.2.2005 (3 days - free course) The JAVA Programming Language Level 2: 7 - 9.2.2005 (3 days) C++ Programming Advanced -Traps and Pitfalls: 8 - 11.2.2005 (4 days) Joint PVSS JCOP Framework: 14 - 18.2.2005 (5 days) JAVA 2 Enterprise Edition - Part 1: WEB Applications: 21 & 22.2.2005 (2 days) FrontPage 2003 - niveau 1 : 21 & 22.2.2005 (2 jours) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 23 - 25.2.2005 (3 days) ELEC-2005 - Spring Term: Integrated circuits and VLSI technology...

  7. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Joint PVSS JCOP Framework : 9 - 13.8.2004 (5 days) Outlook (I): E-mail : 31.8.2004 (2 hours, morning) Outlook (II): Calendar, Tasks and Notes : 31.8.2004 (2 hours, afternoon) Hands-on Introduction to Python Programming : 1 - 3.9.2004 (3 days - free course) Instructor-led WBTechT Study or Follow-up for Microsoft Applications : 7.9.2004 (morning) Outlook (III): Meetings and Delegation : 7.9.2004 (2 hours, afternoon) Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE : 7 & 8.9.2004 (2 jours) Joint PVSS JCOP Framework : 13 - 17.9.2004 (5 days) AutoCAD 2002 - niveau 1 : 13, 14, 23, 24.9.2004 (4 jours) Programmation STEP7 niveau 1 : 14 - 17.9.2004 (4 jours) FrontPage 2003 - niveau 1 : 20 & 21.9.2004 (2 jours) ANSYS: Thermal Analysis : 22 - 24.9.2004 (3 days) ANSYS: Advanced Topics : 27.9...

  8. Technical Training: Places available

    CERN Document Server

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Instructor-led WBTechT Study or Follow-up for Microsoft Applications : 7.9.2004 7.9.2004 Outlook (short course III) : Meetings and Delegation : 7.9.2004 (2 hours, afternoon) Introduction au VHDL et utilisation du simulateur NCVHDL de CADENCE : 7 & 8.9.2004 (2 jours) Joint PVSS JCOP Framework : 13 - 17.9.2004 (5 days) Programmation STEP7 niveau 1 : 14-17.9.2004 (4 jours) ANSYS : Thermal Analysis : 22 - 24.9.2004 (3 days) LabVIEW Migration 6 à 7 : 23.9.2004 (one day) ANSYS : Advanced Topics : 27.9 - 1.10.2004 (5 days) Word 2003 - niveau 2 : 27 & 28.9.2004 (2 jours) LabVIEW - Basics 1 : 27 - 29.9.2004 (3 days) MAGNE-04 : Magnétisme pour l'électrotechnique : 28 - 30.9.2004 (3 jours) LabVIEW - Basics 2 : 30.9 & 1.10.2004 (2 days) Introduction à Windows XP au CERN : 4.10.2004 (matin) ...

  9. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Programmation STEP7 niveau 1 : 14-17.9.2004 (4 jours) ANSYS : Thermal Analysis : 22 - 24.9.2004 (3 days) LabVIEW Migration 6 à 7 : 23.9.2004 (one day) ANSYS : Advanced Topics : 27.9 - 1.10.2004 (5 days) Word 2003 - niveau 2 : 27 & 28.9.2004 (2 jours) LabVIEW - Basics 1 : 27 - 29.9.2004 (3 days) MAGNE-04 : Magnétisme pour l'électrotechnique : 28 - 30.9.2004 (3 jours) LabVIEW - Basics 2 : 30.9 & 1.10.2004 (2 days) Introduction à Windows XP au CERN : 4.10.2004 (matin) FrontPage 2003 - niveau 1 : 7 & 8.10.04 (2 jours) Outlook (short course I) : E-mail : 22.10.2004 (2 hours, morning) Outlook (short course II) : Calendar, Tasks and Notes: 22.10.2004 (2 hours, afternoon) Introduction à ANSYS : 23 - 26.11.2004 (4 jours) ENSEIGNEMENT TECHNIQUE TECHNICAL TRAINING Monique Duval 74924...

  10. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Hands-on Introduction to Python Programming: 28 - 30.6.2005 (3 days) Introduction to ANSYS: 21 - 24.6.2005 (4 days) IT3T/3 - Working remotely with Windows XP: 28.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/4 - Editing Websites with Frontpage 2003: 30.6.2005 (IT Technical Training Tutorial, free of charge) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.7.2005 (1 jour) FrontPage 2003 - niveau 1 : 6-7.7.2005 (2 jours) LabVIEW base 1 : 4 - 6.7.2005 (3 jours) LabVIEW Basics 2: 7 - 8.7.2005 (2 days) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoCorrect, Find/Replace) : 4.7.2005 (afternoon) WORD 2003 (Short Course II) - HowTo... Mail merge: 5.7.2005 (afternoon) WORD 2003 (Short Course III) - HowTo (4 mornings) EXCEL 2003 (Short Course I) - HowTo... Work ...

  11. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: LabVIEW Real-Time (F) : 7 - 9.6.2005 (3 jours) LabVIEW Migration 6 to 7: 14.6.2005 (1 day) FrontPage 2003 - niveau 2 : 16 & 17.6.2005 (2 jours) Utilisation de fichiers PDF avec ACROBAT 6.0 : 20.6.2005 (1journée) Introduction to ANSYS: 21 - 24.6.2005 (4 days) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoCorrect, Find/Replace) : 4.7.2005 (afternoon) WORD 2003 (Short Course II) - HowTo... Mail merge: 5.7.2005 (afternoon) WORD 2003 (Short Course III) - HowTo... Work with long documents : 6.7.2005 (afternoon) ACCESS 2003 - Level 2 - ECDL AM5: 5 - 8.7.2005 (4 mornings) EXCEL 2003 (Short Course I) - HowTo... Work with formulae: 7.7.2005 (afternoon) EXCEL 2003 (Short Course II) - HowTo... Format your worksheet for printing: 8.7.2005 (aftern...

  12. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: LabVIEW base 1 : 4 - 6.7.2005 (3 jours) LabVIEW Basics 2: 7 - 8.7.2005 (2 days) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.7.2005 (1 jour) FrontPage 2003 - niveau 1 : 6-7.7.2005 (2 jours) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoCorrect, Find/Replace) : 4.7.2005 (afternoon) WORD 2003 (Short Course II) - HowTo... Mail merge: 5.7.2005 (afternoon) WORD 2003 (Short Course III) - HowTo... Work with long documents : 6.7.2005 (afternoon) OUTLOOK (Short Course I) - E-mail: 6.7.2005 (morning) OUTLOOK (Short Course II) - Calendar, Tasks and Notes: 7.7.2005 (morning) OUTLOOK (Short Course III) - Meetings and Delegation: 8.7.2005 (morning) EXCEL 2003 (Short Course I) - HowTo... Work with formulae: 7.7.2005 (afternoon) EXCEL 2003 (Short Course II) - HowTo... Format y...

  13. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: LabVIEW Real-Time (F) : 7 - 9.6.2005 (3 jours) LabVIEW Migration 6 to 7: 14.6.2005 (1 day) IT3T/1 - Read your mail and more with Outlook 2003 : 14.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/2 - Creating, managing and using distribution lists with Simba2 : 16.6.2005 (IT Technical Training Tutorial, free of charge) FrontPage 2003 - niveau 2 : 16 & 17.6.2005 (2 jours) Utilisation de fichiers PDF avec ACROBAT 6.0 : 20.6.2005 (1journée) Introduction to ANSYS: 21 - 24.6.2005 (4 days) IT3T/3 - Working remotely with Windows XP : 28.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/4 - Editing Websites with Frontpage 2003 : 30.6.2005 (IT Technical Training Tutorial, free of charge) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoC...

  14. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Hands-on Introduction to Python Programming: 28 - 30.6.2005 (3 days) Introduction to ANSYS: 28.6 - 1.7.2005 (4 days) IT3T/3 - Working remotely with Windows XP: 28.6.2005 (IT Technical Training Tutorial, free of charge) IT3T/4 - Editing Websites with Frontpage 2003: 30.6.2005 (IT Technical Training Tutorial, free of charge) LabVIEW base 1 : 4 - 6.7.2005 (3 jours) LabVIEW Basics 2: 7 - 8.7.2005 (2 days) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.7.2005 (1 jour) FrontPage 2003 - niveau 1 : 6-7.7.2005 (2 jours) WORD 2003 (Short Course I) - HowTo... Work with repetitive tasks /AutoText, AutoFormat, AutoCorrect, Find/Replace) : 4.7.2005 (afternoon) WORD 2003 (Short Course II) - HowTo... Mail merge: 5.7.2005 (afternoon) WORD 2003 (Short Course III) - HowTo... Work with long documents : 6.7.2005 (afternoon) ACCES...

  15. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: JAVA 2 Enterprise Edition - Part 1: WEB Applications: 21 & 22.2.2005 (2 days) FrontPage 2003 - niveau 1 : 21 & 22.2.2005 (2 jours) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 23 - 25.2.2005 (3 days) Utilisation des fichiers PDF avec ACROBAT 6.0 : 1.3.2005 (1 journée) ELEC-2005 - Spring Term: Integrated circuits and VLSI technology for physics: 1 - 17.3.2005 (6 X 2.30-hours lectures) C++ for Particle Physicists: 7 - 11.3.2005 (6 X 3-hour lectures) Joint PVSS JCOP Framework : 14 - 18.3.2005 (5 days) AutoCAD 2002 - niveau 1 : 15, 16, 21& 22.3.2005 (4 jours) FrontPage 2003 - niveau 2 : 21 & 22.3.2005 (2 jours) FileMaker - niveau 2 : 4 & 5.4.2005 (2 jours) EXCEL 2003 - niveau 2 : 11 & 12.4.2005 (2 jours) LabVIEW intermediate 1: 11 - 13....

  16. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: LabVIEW base 2/basics 2 : 3 & 4.2.2005 (2 jours/2 days - langue à décider/language to be decided) Finite State Machines in the JCOP Framework: 1 - 3.2.2005 (3 days - free course) The JAVA Programming Language Level 2: 7 - 9.2.2005 (3 days) JAVA 2 Enterprise Edition - Part 1: WEB Applications: 21 & 22.2.2005 (2 days) FrontPage 2003 - niveau 1 : 21 & 22.2.2005 (2 jours) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 23 - 25.2.2005 (3 days) ELEC-2005 - Spring Term: Integrated circuits and VLSI technology for physics: 1 - 17.3.2005 (6 X 2.30-hours lectures) C++ for Particle Physicists: 7 - 11.3.2005 (6 X 3-hour lectures) Joint PVSS JCOP Framework : 14 - 18.3.2005 (5 days) AutoCAD 2002 - niveau 1 : 15, 16, 21& 22.3.2005 (4 jours) FrontPage 20...

  17. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: ELEC-2005 - Spring Term: Integrated circuits and VLSI technology for physics: 1 - 17.3.2005 (6 x 2.5-hour lectures) C++ for Particle Physicists: 7 - 11.3.2005 (6 x 3-hour lectures) Joint PVSS JCOP Framework : 14 - 18.3.2005 (5 days) Oracle 9i: SQL: 14 -16.3.2005 (3 days) AXEL-2005; Introduction to Particle Accelerators : 14- 18.3.2005 (10 x 1 h lectures) ACCESS 2003 - Level 1: ECDL M5: 15 - 16.3.2005 (2 days) AutoCAD 2002 - niveau 1 : 15, 16, 21& 22.3.2005 (4 jours) FrontPage 2003 - niveau 2 : 21 & 22.3.2005 (2 jours) Hands-on Object-Oriented Design and Programming with C++ : 22 - 24.3.2005 (3 days) FileMaker - niveau 2 : 4 & 5.4.2005 (2 jours) Oracle 9i: Programming with PL/SQL: 4 - 6.4.2005 (3 days) EXCEL 2003 - niveau 2 : 11 & 12.4.2005 (2 jours) LabVIEW Intermedia...

  18. TECHNICAL TRAINING: PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: LabVIEW Basics 1 : 22 - 24.3.2004 (3 days) Oracle 9i : New Features for Developers : 22 - 24.3.2004 (3 days) Instructor-led WBTechT study or follow-up for Microsoft applications : 1.4.2004 (morning) FrontPage XP - niveau 1 : 5 & 6.4.2004 (2 jours) AutoCAD 2002 - niveau 1 : 19, 20.4 et 3, 4.5.2004 (4 jours) Oracle 8i/9i - Develop Web-based Applications with PL/SQL : 19 & 20.4.2004 (2 days) Introduction to ANSYS : 20 - 23.4.2004 (4 days) LabVIEW hands-on (E) : 20.4.2004 (afternoon, free of charge) FrontPage XP - niveau 2 : 26 & 27.4.2004 (2 jours) LabVIEW Base 2 : 6 & 7.5.2004 (2 jours) Word XP - niveau 1 : 10 & 11.5.2004 (2 jours) Word XP - niveau 2 : 24 & 25.5.2004 (2 jours) If you wish to participate in one of these courses, pleas...

  19. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: The CERN EDMS for Engineers : 6.10.2004 (1 day) FileMaker - niveau 1 : 18 & 19.10.2004 (2 jours) Outlook (short course I) : E-mail : 22.10.2004 (2 hours, morning) Outlook (short course II) : Calendar, Tasks and Notes: 22.10.2004 (2 hours, afternoon) Excel 2003 - niveau 1 : 4 & 5.11.2004 (2 jours) LabVIEW Intermediate I : 8 - 10.11.2004 (3 days) Instructor-led WTechT Study or Follow-up for Microsoft Applications : 9.11.2004 (morning) Hands-On Object Oriented Design and Programming with C++ : 9 - 11.11.2004 (3 days) Outlook (Short Course III) : Meetings and Delegation : 9.11.2004 (2 hours, afternoon) LabVIEW Intermediate II : 11 & 12.11.2004 (2 days) AutoCAD 2002 - niveau 1 : 11, 12, 18, 19.11.2004 (4 jours) C++ for Particle Physicists : 15 - 19.11.2004 (6 X 3 hours sessions...

  20. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: FileMaker - niveau 1 : 18 & 19.10.2004 (2 jours) Outlook (short course I) : E-mail : 22.10.2004 (2 hours, morning) Outlook (short course II) : Calendar, Tasks and Notes: 22.10.2004 (2 hours, afternoon) Excel 2003 - niveau 1 : 4 & 5.11.2004 (2 jours) LabVIEW Intermediate I : 8 - 10.11.2004 (3 days) Instructor-led WTechT Study or Follow-up for Microsoft Applications : 9.11.2004 (morning) Hands-On Object Oriented Design and Programming with C++ : 9 - 11.11.2004 (3 days) Outlook (Short Course III) : Meetings and Delegation : 9.11.2004 (2 hours, afternoon) LabVIEW Intermediate II : 11 & 12.11.2004 (2 days) AutoCAD 2002 - niveau 1 : 11, 12, 18, 19.11.2004 (4 jours) C++ for Particle Physicists : 15 - 19.11.2004 (6 X 3 hours sessions) FrontPage 2003 - niveau 2 : 18 &a...

  1. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2004-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available in the following courses: Outlook (short course I) : E-mail : 22.10.2004 (2 hours, morning) Outlook (short course II) : Calendar, Tasks and Notes: 22.10.2004 (2 hours, afternoon) Excel 2003 - niveau 1 : 4 & 5.11.2004 (2 jours) LabVIEW Intermediate I : 8 - 10.11.2004 (3 days) Instructor-led WTechT Study or Follow-up for Microsoft Applications : 9.11.2004 (morning) Hands-On Object Oriented Design and Programming with C++ : 9 - 11.11.2004 (3 days) Outlook (Short Course III) : Meetings and Delegation : 9.11.2004 (2 hours, afternoon) LabVIEW Intermediate II : 11 & 12.11.2004 (2 days) AutoCAD 2002 - niveau 1 : 11, 12, 18, 19.11.2004 (4 jours) C++ for Particle Physicists : 15 - 19.11.2004 (6 X 3 hours sessions) FrontPage 2003 - niveau 2 : 18 & 19.11.2004 (2 jours) Word 2003 - niveau 1 : 22 &a...

  2. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: ELEC-2005 Autumn Term - Electronics applications in HEP experiments: 8.11 - 8.12.2005 (10 x 2h lectures) The CERN EDMS for Local Administrators: 15-16.11.2005 (2 days, free of charge) OUTLOOK (Short Course II) - Calendar, Tasks and Notes: 16.11.2005 (morning) Hands-On Object Oriented Design and Programming with C++ : 16 - 18.11.2005 (3 days) The CERN EDMS for Engineers: 17.11.2005 (1 day, free of charge) The Java Programming Language Level 1: 21 - 23.11.2005 (3 days) Hands-on Introduction to Python Programming: 28 - 30.11.2005 (3 days) OUTLOOK (Short Course III) - Meetings and Delegation: 30.11.2005 (morning) WORD 2003 (Short Course III) - HowTo... Work with long documents : 30.11.2005 (afternoon) FrontPage 2003 - niveau 2 : 5 - 6.12.2005 (2 jours) LabVIEW Application Development (Intermediate 1): 5 - 7.12.2005 (3 d...

  3. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Joint PVSS JCOP Framework : 7 - 11.11.2005 (5 days) ELEC-2005 Autumn Term - Electronics applications in HEP experiments: 8.11 - 8.12.2005 (10 x 2h lectures) The EDMS-MTF in practice: 9.11.2005 (morning, free of charge) The CERN EDMS for Local Administrators: 15-16.11.2005 (2 days, free of charge) OUTLOOK (Short Course II) - Calendar, Tasks and Notes: 16.11.2005 (morning) Hands-On Object Oriented Design and Programming with C++ : 16 - 18.11.2005 (3 days) The CERN EDMS for Engineers: 17.11.2005 (1 day, free of charge) The Java Programming Language Level 1: 21 - 23.11.2005 (3 days) Hands-on Introduction to Python Programming: 28 - 30.11.2005 (3 days) OUTLOOK (Short Course III) - Meetings and Delegation: 30.11.2005 (morning) WORD 2003 (Short Course III) - HowTo... Work with long documents : 30.11.2005 (afternoon) Fron...

  4. Technical training: places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Introduction to the CERN EDMS: 2.11.2005 (1 day, free of charge) OUTLOOK (Short Course I) - E-mail: 2.11.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 2.11.2005 (afternoon) FrontPage 2003 - niveau 1 :  3 - 4.11.2005 (2 jours) AutoCAD 2006 - niveau 1 : 3, 4, 9, 10.11.2005 (4 jours) Joint PVSS JCOP Framework : 7 - 11.11.2005 (5 days) The CERN EDMS for Engineers: 8.11.2005 (1 day, free of charge) The EDMS-MTF in practice: 9.11.2005 (morning, free of charge) The CERN EDMS for Local Administrators: 15-16.11.2005 (2 days, free of charge) OUTLOOK (Short Course II) - Calendar, Tasks and Notes: 16.11.2005 (morning) Hands-On Object Oriented Design and Programming with C++ : 16 - 18.11.2005 (3 days) The Java Programming Language Level 1: 21 - 23.11.2005 (3 days) Hands-on Introduction to Python Prog...

  5. Equitable availability of social facilities

    CSIR Research Space (South Africa)

    Green, Cheri A

    2008-11-01

    Full Text Available and promote development. Part of the prerequisite of basic services is the provision of social facilities, for example primary health care, parks, sports fields and community halls. The CSIR research investigates the sufficient and equitable availability...

  6. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Finite State Machines in the JCOP Framework:  26 - 28.9.2005 (3 days) WORD 2003 (Short Course IV) - HowTo... Work with master document: 28.9.2005 (morning) Joint PVSS JCOP Framework : 3 - 7.10.2005 (5 days) Introduction à Dreamweaver MX :  3 - 4.10.2005 (2 jours) Utilisation des fichiers PDF avec Acrobat 7.0 :   4.10.2005 (1 journée) LaTeX par la pratique :   4 - 6.10.2005 (3 matinées) PowerPoint 2003 (F) :  7.10.2005 (1 journée) FileMaker - niveau 1 :  20 - 21.10.2005 (2 jours) ACCESS 2003 - Level 1 - ECDL M5: 24 - 25.10.2005 (2 days) EXCEL 2003 (Short Course III) - HowTo... Pivot tables: 26.10.2005 (morning) WORD 2003 (Short Course I) - HowTo... Work with AutoTasks: 26.10.2005 (afternoon) OUTLOOK (Short Course I) - E-mail: 2.11.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 2.11....

  7. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Introduction à Windows XP au CERN : 12.9.2005 (1 demi-journée) FrontPage 2003 - niveau 2 : 15 - 16.9.2005 (2 jours) Finite State Machines in the JCOP Framework:  26 - 28.9.2005 (3 days) MAGNE-05 - Magnétisme pour l'électrotechnique : 27 - 29.9.2005 (3 jours) WORD 2003 (Short Course IV) - HowTo... Work with master document: 28.9.2005 (morning) Joint PVSS JCOP Framework : 3 - 7.10.2005 (5 days) Introduction à Dreamweaver MX :  3 - 4.10.2005 (2 jours) Utilisation des fichiers PDF avec Acrobat 7.0 :   4.10.2005 (1 journée) LaTeX par la pratique :   4 - 6.10.2005 (3 matinées) PowerPoint 2003 (F) :  7.10.2005 (1 journée) ACCESS 2003 - Level 1 - ECDL M5: 24 - 25.10.2005 (2 days) EXCEL 2003 (Short Course III) - HowTo... Pivot tables: 26.10.2005 (morning) WORD 2003 (Short Course I) - HowTo... Work with Auto...

  8. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.9.2005 (1 jour) LabVIEW Basics 1:  5 - 7.9.2005 (3 days) Introduction à Windows XP au CERN : 12.9.2005 (1 demi-journée) FrontPage 2003 - niveau 2 : 15 - 16.9.2005 (2 jours) AutoCAD 2005 - niveau 1 : 22, 23, 28, 29.9.2005 (4 jours) Finite State Machines in the JCOP Framework:  26 - 28.9.2005 (3 days) MAGNE-05 - Magnétisme pour l'électrotechnique : 27 - 29.9.2005 (3 jours) WORD 2003 (Short Course IV) - HowTo... Work with master document: 28.9.2005 (morning) Joint PVSS JCOP Framework : 3 - 7.10.2005 (5 days) ACCESS 2003 - Level 1 - ECDL M5: 24 - 25.10.2005 (2 days) EXCEL 2003 (Short Course III) - HowTo... Pivot tables: 26.10.2005 (morning) WORD 2003 (Short Course I) - HowTo... Work with AutoTasks: 26.10.2005 (afternoon) OUTLOOK (Short Course I) - E-mail: 2...

  9. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Joint PVSS JCOP Framework: 8 - 12.8.2005 (5 days) WORD 2003 (Short Course I) - HowTo... Work with AutoTasks (AutoText, AutoFormat, AutoCorrect, Lists, Find/Replace): 25.8.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 25.8.2005 (afternoon) EXCEL 2003 (Short Course I) - HowTo... Work with formulae: 26.8.2005 (morning) WORD 2003 (Short Course III) - HowTo... Work with long documents: 26.8.2005 (afternoon) FrontPage 2003 - niveau 1 : 1 - 2.9.2005 (2 jours) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.9.2005 (1 jour) LabVIEW Basics 1 : 5 - 7.9.2005 (3 days, dates to be confirmed) Introduction à Windows XP au CERN : 12.9.2005 (1 demi-journée) FrontPage 2003 - niveau 2 : 15 - 16.9.2005 (2 jours) AutoCAD 2005 - niveau 1 : 22, 23, 28, 29.9.2005 (4 jours) Finite State Machines in the JCOP Framew...

  10. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: FrontPage 2003 - niveau 2 : 5 - 6.12.2005 (2 jours) Introduction à ANSYS Classique : 6 - 9.12.2005 (4 jours) EXCEL 2003 (Short Course II) - HowTo... Format your worksheet for printing: 7.12.2005 (morning) PCAD Schémas - Introduction : 8 - 9.12.2005 (2 jours) Finite State Machines in the JCOP Framework: 13 - 15.12.2005 (3 days) ACCESS 2003 - Level 2 - ECDL AM5: 14 - 15.12.2005 (2 days) PCAD PCB - Introduction : 14 - 16.12.2005 (3 jours) AutoCAD 2006 - niveau 1 : 19, 20, 24 & 25.1.2006 (4 jours) LabVIEW Basics I:  23 - 25.1.2006 (3 days) C++ Programming Advanced - Traps and Pitfalls: 24 - 27.1.2006 (4 days) STEP7 Programming Level 1: 24 - 27.1.2006 (4 days) LabVIEW Basics II:  26 - 27.1.2006 (2 days) AutoCAD Mechanical 2006 : 30 - 31.1.2006 (2 jours; suite du cours AutoCAD 2006 - niveau 1) Joint PVS...

  11. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: FrontPage 2003 - niveau 1 : 9 & 10.5.2005 (2 jours) ELEC-2005 - Summer Term: System electronics for physics - Issues : 10, 12, 17, 19, 24, 26 & 31.5.2005 (7 x 2h lectures) AutoCAD 2005 - niveau 1 : 12, 13, 18, 19.5.2005 (4 jours) ACCESS 2003 - Level 1: ECDL M5 : 11 & 12.5.2005 (2 days) Object-Oriented Analysis and Design using UML: 17 - 19.5.2005 (3 days) Synplify Pro Training: 18.5.2005 (1 day) Finite State Machines in the JCOP Framework: 24 - 26.5.2005 (3 days) The Joint PVSS JCOP Framework: 30.5 - 3.6.2005 (5 days) Introduction à la CAO CADENCE : 31.5 - 1.6.2005 (2 jours) LabVIEW Real-Time (F) : 7 - 9.6.2005 (3 jours) LabVIEW Migration 6 to 7: 14.6.2005 (1 day) FrontPage 2003 - niveau 2 : 16 & 17.6.2005 (2 jours) Utilisation de fichiers PDF avec ACROBAT 6.0 : 20.6.2005 (1journée) Intr...

  12. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Joint PVSS JCOP Framework : 3 - 7.10.2005 (5 days) Utilisation des fichiers PDF avec Acrobat 7.0 :   4.10.2005 (1 journée) LaTeX par la pratique :   4 - 6.10.2005 (3 matinées) PowerPoint 2003 (F) :  7.10.2005 (1 journée) FileMaker - niveau 1 :  20 - 21.10.2005 (2 jours) ACCESS 2003 - Level 1 - ECDL M5: 24 - 25.10.2005 (2 days) Finite State Machines in the JCOP Framework : 25 - 27.10.2005 (3 days) EXCEL 2003 (Short Course III) - HowTo... Pivot tables: 26.10.2005 (morning) WORD 2003 (Short Course I) - HowTo... Work with AutoTasks: 26.10.2005 (afternoon) OUTLOOK (Short Course I) - E-mail: 2.11.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 2.11.2005 (afternoon) FrontPage 2003 - niveau 1 :  3 - 4.11.2005 (2 jours) AutoCAD 2006 - niveau 1 : 3, 4, 9, 10.11.2005 (4 jours) Joint PVSS JCO...

  13. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: FrontPage 2003 - niveau 1 : 1 - 2.9.2005 (2 jours) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.9.2005 (1 jour) LabVIEW Basics 1:  5 â€" 7.9.2005 (3 days) Introduction à Windows XP au CERN : 12.9.2005 (1 demi-journée) FrontPage 2003 - niveau 2 : 15 - 16.9.2005 (2 jours) AutoCAD 2005 - niveau 1 : 22, 23, 28, 29.9.2005 (4 jours) Finite State Machines in the JCOP Framework:  26 - 28.9.2005 (3 days) MAGNE-05 - Magnétisme pour l'électrotechnique : 27 - 29.9.2005 (3 jours) Joint PVSS JCOP Framework : 3 - 7.10.2005 (5 days) ACCESS 2003 - Level 1 - ECDL M5: 24 - 25.10.2005 (2 days) EXCEL 2003 (Short Course III) - HowTo... Pivot tables: 26.10.2005 (morning) OUTLOOK (Short Course I) - E-mail: 2.11.2005 (morning) OUTLOOK (Short Course II) - Calendar, Tasks and Notes: 16.11.2005 (morning) OU...

  14. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: The CERN EDMS for Local Administrators: 19 & 20.1.2005 (2 days - free course) Programmation Unity-Pro pour utilisateurs de Schneider PL7-Pro : 24 - 28.1.2005 (9 demi-journées) LabVIEW base 1/basics 1 : 31.1 - 2.2.2005 (3 jours/3 days - langue à décider/language to be decided) LabVIEW base 2/basics 2 : 3 & 4.2.2005 (2 jours/2 days - langue à décider/language to be decided) Finite State Machines in the JCOP Framework: 1 - 3.2.2005 (3 days - free course) The JAVA Programming Language Level 2: 7 - 9.2.2005 (3 days) C++ Programming Advanced -Traps and Pitfalls: 8 - 11.2.2005 (4 days) Joint PVSS JCOP Framework: 14 - 18.2.2005 (5 days) JAVA 2 Enterprise Edition - Part 1: WEB Applications: 21 & 22.2.2005 (2 days) JAVA 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 23 - 25.2.2005 (3 days) ELEC-2005 â...

  15. Places disponibles*/Places available **

    CERN Multimedia

    2003-01-01

    Des places sont disponibles dans les cours suivants : Places are available in the following course : Java 2 Enterprise Edition - Part 2 : Enterprise JavaBeans : 20 - 22.1.03 (3 days) Introduction to PVSS : 27.1.03 (Afternoon) free course but registration necessary Basic PVSS : 28 - 30.1.03 (3 days) MAGNE-03 - Magnétisme pour l'électrotechnique : 28 - 30.1.03 (3 jours) MAGNE-03 - Magnetism for Technical Electronics : 11 - 13.2.03 (3 days) AutoCAD 2002 - niveau 1 : 24, 25.2 et 3, 4.3.03 (4 jours) AutoCAD 2002 - niveau 2 : 10 & 11.3.03 (2 jours) C++ for Particle Physicists : 10 - 14.3.03 (6 X 3 hour lectures) AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 17, 18, 24 & 25.3.03 (6 jours) * Etant donné le délai d'impression du Bulletin, ces places peuvent ne plus être disponibles au moment de sa parution. Veuillez consulter notre site Web pour avoir la dernière mise à jour. ** The number of places available may vary. Please check our Web site to find out the current availability. Si vous désirez ...

  16. Technical Training: Places available

    CERN Multimedia

    Monique Duval

    2005-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: WORD 2003 (Short Course I) - HowTo... Work with AutoTasks (AutoText, AutoFormat, AutoCorrect, Lists, Find/Replace): 25.8.2005 (morning) WORD 2003 (Short Course II) - HowTo... Mail merge: 25.8.2005 (afternoon) EXCEL 2003 (Short Course I) - HowTo... Work with formulae: 26.8.2005 (morning) WORD 2003 (Short Course III) - HowTo... Work with long documents: 26.8.2005 (afternoon) FrontPage 2003 - niveau 1 : 1 - 2.9.2005 (2 jours) Utilisation des fichiers PDF avec ACROBAT 7.0 : 5.9.2005 (1 jour) LabVIEW base 1 : 5 - 7.9.2005 (3 jours) Introduction à Windows XP au CERN : 12.9.2005 (1 demi-journée) FrontPage 2003 - niveau 2 : 15 - 16.9.2005 (2 jours) AutoCAD 2005 - niveau 1 : 22, 23, 28, 29.9.2005 (4 jours) Finite State Machines in the JCOP Framework:  26 - 28.9.2005 (3 days) MAGNE-05 - Magnétisme pour l'électrotechniq...

  17. Commercially available video motion detectors

    International Nuclear Information System (INIS)

    1979-01-01

    A market survey of commercially available video motion detection systems was conducted by the Intrusion Detection Systems Technology Division of Sandia Laboratories. The information obtained from this survey is summarized in this report. The cutoff date for this information is May 1978. A list of commercially available video motion detection systems is appended

  18. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Title Hours Date Language AutoCAD Mechanical 2006 16 30 to 31-01-06 F DIAdem : base 24 01 to 03-02-06 F ACROBAT 7.0 : Utilisation de fichiers PDF 8 06-02-06 F Manipulation des images 4 08-02-06 F OUTLOOK 2003 (Short Course I) - E-mail 3 09-02-06 E-F WORD 2003 (Short Course II) - HowTo... Mail merge 3 09-02-06 E-F ACCESS 2003 - Level 1: ECDL M5 16 13 to 14-02-06 E-F JCOP: Control System Integration using JCOP Tools 24 14 to 16-02-06 E OUTLOOK 2003 (Short Course II) - Calendar, Tasks and Notes 3 16-02-06 E-F WORD 2003 (Short Course III) - HowTo... Work with long documents 3 16-02-06 E-F FrontPage 2003 - niveau 1 16 23 to 24-02-06 F OUTLOOK 2003 (Short Course III) - Meetings and Delegation 3 27-02-06 E-F WORD 2003 (Short Course IV) - HowTo... Work with master document 3 27-02-06 E-F ...

  19. Technical Training: Places available

    CERN Multimedia

    Davide Vitè

    2006-01-01

    The number of places available may vary. Please check our Web site to find out the current availability. Places are available on the following courses: Title Hours Date Language ACCESS 2003 - Level 2: ECDL AM5 16 19 to 20-01-06 E-F AutoCAD 2006 - niveau 1 32 19 to 25-01-06 F C++ Programming Advanced - Traps and Pitfalls 32 24 to 27-01-06 E STEP7 : Level 1 32 24 to 27-01-06 E LabVIEW Basics 2 16 26 to 27-01-06 E AutoCAD Mechanical 2006 16 30 to 31-01-06 F DIAdem : base 24 01 to 03-02-06 F FrontPage 2003 - niveau 1 16 02 to 03-02-06 F ACROBAT 7.0 : Utilisation de fichiers PDF 8 06-02-06 F Manipulation des images 4 08-02-06 F OUTLOOK 2003 (Short Course I) - E-mail 3 09-02-06 E-F WORD 2003 (Short Course II) - HowTo... Mail merge 3 09-02-06 E-F ACCESS 2003 - Level 1: ECDL M5 16 13 to 14-02-06 E-F JCOP: Control System Integration using JCOP Tools 24 14 to 16-02-06 E OUTLOOK 2003 (Short Course II) - Calendar, Tasks and Note...

  20. EVALUATING COMMERCIALLY AVAILABLE DERMAL ...

    Science.gov (United States)

    As the Human Exposure Program focuses on the exposure of children to pesticides, there are concerns about the effect, or perceived effect, of components of the sampling procedure on the health and well-being of the infant and the ability to collect pesticide residues. One concern involves the materials in wipes used to collect pesticide residues or other contact materials on the skin. In recent studies (e.g., National Human Exposure Assessment Survey; NHEXAS), isopropyl alcohol has been used as a solvent in conjunction with a cloth wipe to obtain samples from the hands of adults and children. Although isopropyl alcohol is generally considered innocuous, the use of commercially available products could eliminate concerns about exposure to alcohol. A few studies have evaluated the potential of commercially available baby wipes to collect personal exposure samples for metals research, but not for the area of pesticide research (Millson et al., 1994; Campbell et al., 1993; Lichtenwalner et al., 1993). Therefore, there is a need to evaluate the potential for using commercially available baby wipes for collecting pesticide samples from skin and other surfaces. Another concern involves establishing a convenient and safe method for assessing overall dermal exposure for children, especially for those in crawling stage. One route that the U .S. Environmental Protection Agency (EPA) would like to investigate is the use of cotton body suits (infant sleepers) as an indicator

  1. Accelerator Availability and Reliability Issues

    Energy Technology Data Exchange (ETDEWEB)

    Steve Suhring

    2003-05-01

    Maintaining reliable machine operations for existing machines as well as planning for future machines' operability present significant challenges to those responsible for system performance and improvement. Changes to machine requirements and beam specifications often reduce overall machine availability in an effort to meet user needs. Accelerator reliability issues from around the world will be presented, followed by a discussion of the major factors influencing machine availability.

  2. Machine Protection: Availability for Particle Accelerators

    CERN Document Server

    Apollonio, Andrea; Schmidt, Ruediger

    2015-03-16

    Machine availability is a key indicator for the performance of the next generation of particle accelerators. Availability requirements need to be carefully considered during the design phase to achieve challenging objectives in different fields, as e.g. particle physics and material science. For existing and future High-Power facilities, such as ESS (European Spallation Source) and HL-LHC (High-Luminosity LHC), operation with unprecedented beam power requires highly dependable Machine Protection Systems (MPS) to avoid any damage-induced downtime. Due to the high complexity of accelerator systems, finding the optimal balance between equipment safety and accelerator availability is challenging. The MPS architecture, as well as the choice of electronic components, have a large influence on the achievable level of availability. In this thesis novel methods to address the availability of accelerators and their protection systems are presented. Examples of studies related to dependable MPS architectures are given i...

  3. High plant availability of phosphorus and low availability of cadmium in four biomass combustion ashes

    International Nuclear Information System (INIS)

    Li, Xiaoxi; Rubæk, Gitte H.; Sørensen, Peter

    2016-01-01

    For biomass combustion to become a sustainable energy production system, it is crucial to minimise landfill of biomass ashes, to recycle the nutrients and to minimise the undesirable impact of hazardous substances in the ash. In order to test the plant availability of phosphorus (P) and cadmium (Cd) in four biomass ashes, we conducted two pot experiments on a P-depleted soil and one mini-plot field experiment on a soil with adequate P status. Test plants were spring barley and Italian ryegrass. Ash applications were compared to triple superphosphate (TSP) and a control without P application. Both TSP and ash significantly increased crop yields and P uptake on the P-depleted soil. In contrast, on the adequate-P soil, the barley yield showed little response to soil amendment, even at 300–500 kg P ha"−"1 application, although the barley took up more P at higher applications. The apparent P use efficiency of the additive was 20% in ryegrass - much higher than that of barley for which P use efficiencies varied on the two soils. Generally, crop Cd concentrations were little affected by the increasing and high applications of ash, except for relatively high Cd concentrations in barley after applying 25 Mg ha"−"1 straw ash. Contrarily, even modest increases in the TSP application markedly increased Cd uptake in plants. This might be explained by the low Cd solubility in the ash or by the reduced Cd availability due to the liming effect of ash. High concentrations of resin-extractable P (available P) in the ash-amended soil after harvest indicate that the ash may also contribute to P availability for the following crops. In conclusion, the biomass ashes in this study had P availability similar to the TSP fertiliser and did not contaminate the crop with Cd during the first year. - Highlights: • Effects of four biomass ashes vs. a P fertiliser (TSP) on two crops were studied. • Ashes increased crop yields with P availability similar to TSP on P-depleted soil.

  4. High plant availability of phosphorus and low availability of cadmium in four biomass combustion ashes

    Energy Technology Data Exchange (ETDEWEB)

    Li, Xiaoxi, E-mail: Xiaoxi.Li@agro.au.dk; Rubæk, Gitte H.; Sørensen, Peter

    2016-07-01

    For biomass combustion to become a sustainable energy production system, it is crucial to minimise landfill of biomass ashes, to recycle the nutrients and to minimise the undesirable impact of hazardous substances in the ash. In order to test the plant availability of phosphorus (P) and cadmium (Cd) in four biomass ashes, we conducted two pot experiments on a P-depleted soil and one mini-plot field experiment on a soil with adequate P status. Test plants were spring barley and Italian ryegrass. Ash applications were compared to triple superphosphate (TSP) and a control without P application. Both TSP and ash significantly increased crop yields and P uptake on the P-depleted soil. In contrast, on the adequate-P soil, the barley yield showed little response to soil amendment, even at 300–500 kg P ha{sup −1} application, although the barley took up more P at higher applications. The apparent P use efficiency of the additive was 20% in ryegrass - much higher than that of barley for which P use efficiencies varied on the two soils. Generally, crop Cd concentrations were little affected by the increasing and high applications of ash, except for relatively high Cd concentrations in barley after applying 25 Mg ha{sup −1} straw ash. Contrarily, even modest increases in the TSP application markedly increased Cd uptake in plants. This might be explained by the low Cd solubility in the ash or by the reduced Cd availability due to the liming effect of ash. High concentrations of resin-extractable P (available P) in the ash-amended soil after harvest indicate that the ash may also contribute to P availability for the following crops. In conclusion, the biomass ashes in this study had P availability similar to the TSP fertiliser and did not contaminate the crop with Cd during the first year. - Highlights: • Effects of four biomass ashes vs. a P fertiliser (TSP) on two crops were studied. • Ashes increased crop yields with P availability similar to TSP on P-depleted soil

  5. Communication course – places available

    CERN Multimedia

    2012-01-01

    Please note that there are some places available in the following communication course starting in November. For more information on the course, click on the course title, this will bring you to the training catalogue. You can then sign-up on line. For advice, you can contact Kerstin Fuhrmeister (70896) or kerstin.fuhrmeister@cern.ch Course Next session Duration Language Availability Gestion de temps 22 November 3 days French 8 places  

  6. Analytical system availability techniques

    NARCIS (Netherlands)

    Brouwers, J.J.H.; Verbeek, P.H.J.; Thomson, W.R.

    1987-01-01

    Analytical techniques are presented to assess the probability distributions and related statistical parameters of loss of production from equipment networks subject to random failures and repairs. The techniques are based on a theoretical model for system availability, which was further developed

  7. Places available **

    CERN Multimedia

    2003-01-01

    Places are available in the following courses: PIPES-2003 - Pratique du Sertissage de tubes métalliques et multicouches : 26.8.03 (stage pratique) The CERN Engineering Data Management System (EDMS) for Engineers : 27.8.03 (1 day, free of charge) CLEAN-2002 : Travailler en salle blanche : 4.9.03 (une demi-journée, séminaire gratuit) The CERN Engineering Data Management System (EDMS) for Local Administrators : 24 & 25.9.03 (2 days, free of charge) Siemens SIMATIC Training : Programmation STEP7 - niveau 1 : 29 - 2.10.03 (4 jours) - ouverture des inscriptions fin août Programmation STEP7 - niveau 2 : 13 - 17.10.03 (5 jours) - ouverture des inscriptions fin août Réseau Simatic Net : 22 & 23.10.03 (2 jours) - ouverture des inscriptions fin août CLEAN-2002 : Working in a Cleanroom : 23.20.03 (half day, free of charge) These courses will be given in French or Englis...

  8. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: November 2002   Introduction to PVSS (free of charge): 11.11.02  (afternoon) EXCEL 2000 - niveau 1 :  12 & 13.11.02  (2 jours) CLEAN-2002: Working in a Cleanroom (English, free of charge):  13.11.2002  (afternoon) AutoCAD 2002 - niveau 1 :  14, 15, 21, 22.11.02  (4 jours) Hands-on Object-Oriented Design and Programming with C++:  19 - 21.11.02  (3 days)  EXCEL 2000 - niveau 2 :  25 & 26.11.02  (2 jours) FrontPage 2000 - niveau 1 :  27 & 28.11.02  (2 jours) December 2002   LabVIEW - DSC (English) :  2 - 3.12.02  (2 days) AutoCAD 2002 - niveau 2 :  2 & 3.12.02  (2 jours) FileMaker (Français) :  2 - 5.12.02  (4 jours) PCAD Schémas - Débutants :  5 & 6.12.02 ...

  9. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: October 2002   Introduction to the CERN Engineering Data Management System (free of charge):  29.10.2002  (1 day) The CERN EDMS for Advanced users (free of charge):  30.10.2002  (1 day) November 2002   LabView hands-on (bilingue/bilingual): 5.11.02 (matin/morning) LabView DAQ hands-on (bilingue/bilingual):  5.11.02  (après-midi afternoon) Introduction au PC et Windows 2000 au CERN :  6 & 7.11.02  (2 jours) Oracle 8i : Access the Database with Java:  7 & 8.11.02  (2 days) AutoCAD 2002 - niveau 2 :  7 & 8.11.02  (2 jours) Introduction to PVSS (free of charge):  11.11.2002 pm  (1/2 day) Basic PVSS:  12 - 14.11.02  (3 days) EXCEL 2000 - niveau 1 :  12 & 13.11.02  (2 jours) CLEAN-2002: Working in a Cleanroom (English, free ...

  10. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: Introduction to Oracle 8i : SQL and PL/SQL:  7 - 11.10.02  (5 days) CLEAN-2002 : Working in a Cleanroom (free of charge):  10.10.02  (half-day, p.m.) LabView Hands-on (bilingue/bilingual) : 10.10.02 (matin/morning) LabView DAQ Hands-on (bilingue/bilingual)  10.10.02 (après-midi /afternoon) Introduction à DesignSpace :  16.10.02  (1 journée) Introduction to DesignSpace:  17.10.02  (1 day) AutoCAD Mechanical 6 PowerPack (F) :  21, 22, 23.10 et 4, 5, 6.11.02  (6 jours) Introduction à ANSYS/Introduction to ANSYS (langue à définir suivant demande/ Language to be chosen according to demand):  21 - 25.10.02  (5 jours/days) HREF-2002: Helium Refrigeration Techniques (English-French, bilingual) :  21 - 25.10.2002  (7 half days) HREF-2002: Techniques de la...

  11. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Automates et réseaux de terrain : 13 & 14.11.01 (3 jours) Introduction à Windows 2000 au CERN : 12 - 14.11.01 (1/2 journée) Introduction to Windows 2000 at CERN :  14.11.01  (half-day) Introduction to PERL 5 :  15 - 16.11.01  (2 days) Sécurité dans les installations cryogéniques : 21 - 22.11.2001 (2 demi-journées) Introduction to C Programming :  21- 23.11.01 (3 days) Programmation TSX Premium 2 : 26 - 30.11.01 (5 jours) Contract Follow-up (F) : 26.11.01 (1/2 journée) Object-Oriented Analysis and Design :  27 - 30.11.2001  (4 days) Introduction to the CERN Engineering Data Management System :  30.11.2001 (1 day) Electromagnetic Compatibility (EMC): Introduction (bilingual) :  3.12.01 (half-day) Introduction to the CERN Engineering Data Management System : 07.12.2001...

  12. 76 FR 375 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year 2010; Historically...

    Science.gov (United States)

    2011-01-04

    ...: Notice of Funding Availability (NOFA) for Fiscal Year 2010; Historically Black Colleges and Universities... Fiscal Year 2010. This NOFA is governed by the information and instructions found in HUD's Fiscal Year 2010 Notice of Funding Availability (NOFA) Policy Requirements and General Section that HUD issued on...

  13. Test plans for availability

    International Nuclear Information System (INIS)

    Rise, J.L.; Bjoerklund, O.

    1978-12-01

    In this work is developed principles for statistical test plans for availability compliance tests. Failure terminated and time terminated fixed size plans are considered as well as sequential test plans without and with failure and time truncation. The suggested methods are evaluated with respect to some important characteristics, namely the average number of failures to termination, the duration of the test and the operating characteristic function. The methods used are based on the assumption that up- and down-times can be considered gamma distributed. Simulation studies indicate that the methods are robust against reasonable deviations in distribution assumptions for the down-times. In the work is also outlined technical conditions and prerequisites applicable to availability compliance tests in general. The approach choosen seems very promising and is worth further development. It is based on the same fundamental principles as present is used in International standardization of equipment reliability testing. (author)

  14. Machine protection: availability for particle accelerators

    International Nuclear Information System (INIS)

    Apollonio, A.

    2015-01-01

    Machine availability is a key indicator for the performance of the next generation of particle accelerators. Availability requirements need to be carefully considered during the design phase to achieve challenging objectives in different fields, as e.g. particle physics and material science. For existing and future High-Power facilities, such as ESS (European Spallation Source) and HL-LHC (High-Luminosity LHC), operation with unprecedented beam power requires highly dependable Machine Protection Systems (MPS) to avoid any damage-induced downtime. Due to the high complexity of accelerator systems, finding the optimal balance between equipment safety and accelerator availability is challenging. The MPS architecture, as well as the choice of electronic components, have a large influence on the achievable level of availability. In this thesis novel methods to address the availability of accelerators and their protection systems are presented. Examples of studies related to dependable MPS architectures are given in the thesis, both for Linear accelerators (Linac4, ESS) and circular particle colliders (LHC and HL-LHC). A study of suitable architectures for interlock systems of future availability-critical facilities is presented. Different methods have been applied to assess the anticipated levels of accelerator availability. The thesis presents the prediction of the performance (integrated luminosity for a particle collider) of LHC and future LHC up- grades, based on a Monte Carlo model that allows reproducing a realistic timeline of LHC operation. This model does not only account for the contribution of MPS, but extends to all systems relevant for LHC operation. Results are extrapolated to LHC run 2, run 3 and HL-LHC to derive individual system requirements, based on the target integrated luminosity. (author)

  15. Beating Depression …Help Is Available

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues Beating Depression …Help Is Available Past Issues / Summer 2007 Table ... treatments are available from your physician. Types of Depression Just like other illnesses, such as heart disease, ...

  16. LHC Report: astounding availability

    CERN Multimedia

    Andrea Apollonio for the LHC team

    2016-01-01

    The LHC is off to an excellent start in 2016, having already produced triple the luminosity of 2015. An important factor in the impressive performance so far this year is the unprecedented machine availability.   LHC integrated luminosity in 2011, 2012, 2015 and 2016 and the prediction of the 2016 performance foreseen at the start of the year. Following the 2015-2016 end of year shutdown, the LHC restarted beam operation in March 2016. Between the restart and the first technical stop (TS1) in June, the LHC's beam intensity was successively increased, achieving operation with 2040 bunches per beam. The technical stop on 7-8 June was shortened to maximise the time available for luminosity production for the LHC experiments before the summer conferences. Following the technical stop, operation resumed and quickly returned to the performance levels previously achieved. Since then, the LHC has been running steadily with up to 2076 bunches per beam. Since the technical stop, a...

  17. Reliability and Availability of Cloud Computing

    CERN Document Server

    Bauer, Eric

    2012-01-01

    A holistic approach to service reliability and availability of cloud computing Reliability and Availability of Cloud Computing provides IS/IT system and solution architects, developers, and engineers with the knowledge needed to assess the impact of virtualization and cloud computing on service reliability and availability. It reveals how to select the most appropriate design for reliability diligence to assure that user expectations are met. Organized in three parts (basics, risk analysis, and recommendations), this resource is accessible to readers of diverse backgrounds and experience le

  18. Disaster Mythology and Availability Cascades

    Directory of Open Access Journals (Sweden)

    Lisa Grow Sun

    2013-04-01

    Full Text Available Sociological research conducted in the aftermath of natural disasters has uncovered a number of “disaster myths” – widely shared misconceptions about typical post-disaster human behavior. This paper discusses the possibility that perpetuation of disaster mythology reflects an “availability cascade,” defined in prior scholarship as a “self-reinforcing process of collective belief formation by which an expressed perception triggers a chain reaction that gives the perception increasing plausibility through its rising availability in public discourse.” (Kuran and Sunstein 1999. Framing the spread of disaster mythology as an availability cascade suggests that certain tools may be useful in halting the myths’ continued perpetuation. These tools include changing the legal and social incentives of so-called “availability entrepreneurs” – those principally responsible for beginning and perpetuating the cascade, as well as insulating decision-makers from political pressures generated by the availability cascade. This paper evaluates the potential effectiveness of these and other solutions for countering disaster mythology. Las investigaciones sociológicas realizadas tras los desastres naturales han hecho evidentes una serie de “mitos del desastre”, conceptos erróneos ampliamente compartidos sobre el comportamiento humano típico tras un desastre. Este artículo analiza la posibilidad de que la perpetuación de los mitos del desastre refleje una “cascada de disponibilidad”, definida en estudios anteriores como un “proceso de auto-refuerzo de la formación de una creencia colectiva, a través del que una percepción expresada produce una reacción en cadena que hace que la percepción sea cada vez más verosímil, a través de una mayor presencia en el discurso público” (Kuran y Sunstein 1999. Enmarcar la propagación de los mitos del desastre como una cascada de disponibilidad sugiere que ciertas herramientas pueden ser

  19. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2002-01-01

    Places are available in the following courses: LabView hands-on : 21.01.02 (1/2 journée) LabView DAQ hands-on : 21.01.02 (1/2 journée) FileMaker Pro : 22 - 25.1.02 (4 jours) MS-Project 2000 : 22, 24 & 25.01.02 (3 jours) Introduction au PC et à Windows 2000 au CERN : 29 - 30.1.02 (2 jours) LabView Base 1 : 4 - 6.2.02 (3 jours) LabView DAQ  (E) :  7 & 8.02.02 (2 days) Hands-on Object-Oriented Design & Programming with Java :  11 - 13.02.02 (3 days) PVSS basics :  11 - 15.2.02 (5 days) Introduction à Windows 2000 : 18.2.02 (1 demi-journée) Introduction to the CERN Engineering Data Management System :  20.2.02 (1 day) The CERN Engineering Data Management System for Advanced users :  21.2.02  (1 day) C++ for Particle Physicists :  11 - 15.3.2002  (6 * 3 hour lectures) Cours sur la migration AutoCAD : AutoCAD : Mise à...

  20. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: LabVIEW - Basics 1 :  10 - 12.12.01 (3 days) Introduction to XML :  12 & 13.12.01 (2 days) Introduction au PC et Windows 2000 : 12 & 14.12.01 (2 jours) LabVIEW - Basics 2 :  13 - 14.12.01 (2 days) Habilitation électrique : superviseurs : 17.12.2001 (1/2 journée) MS-Project 2000 : 10 & 11.01.02 (2 jours) EXCEL 2000 - niveau 2 : 15 - 16.1.02 (2 jours) Sécurité dans les installations cryogéniques: 15-17.1.2002 (2 demi-journées) C++ Programming Level 2 - Traps and Pitfalls :  15 - 18.1.2002  (4 days) ELEC-2002 Winter Term: Readout and system electronics for Physics  15.1.2002 - 7.2.2002 (8 half- days) Nouveautés de WORD 2000 : 18.1.02 (1/2 journée) LabView hands-on : 21.01.02 (1/2 journée) LabView DAQ hands-on : 21.01.02 (1/2 journée) FileMaker Pro : 22 -...

  1. PLACES AVAILABLE

    CERN Multimedia

    Enseignement Technique; Tel. 74924

    2001-01-01

    Places are available in the following courses: MS-Project 2000 : 10 & 11.01.02 (2 jours) EXCEL 2000 - niveau 2 : 15 - 16.1.02 (2 jours) Sécurité dans les installations cryogéniques: 15-17.1.2002 (2 demi-journées) C++ Programming Level 2 - Traps and Pitfalls :  15 - 18.1.2002  (4 days) ELEC-2002 Winter Term: Readout and system electronics for Physics  15.1.2002 - 7.2.2002 (8 half- days) Nouveautés de WORD 2000 : 18.1.02 (1/2 journée) LabView hands-on : 21.01.02 (1/2 journée) LabView DAQ hands-on : 21.01.02 (1/2 journée) FileMaker Pro : 22 - 25.1.02 (4 jours) MS-Project 2000 : 24 & 25.01.02 (2 jours) Introduction au PC et à Windows 2000 au CERN : 29 - 30.1.02 (2 jours) LabView Base 1 : 4 - 6.2.02 (3 jours) LabView DAQ  (E) :  7 & 8.02.02 (2 days) Hands-on Object-Oriented Design & Programming with Java :&nbs...

  2. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Cadence Board Design tools : Upgrading to release 14 :  3 1-day sessions on 9, 10 & 11.10.01 MS-Project 2000 - niveau 1 : 15 - 18.10.01 (4 demi-journées) LabView Base 2 : 18 & 19.10.01 (2 jours) WORD 2000 : importer et manipuler des images : 19.10.01 (1 journée) Contract Follow-up (F) :  30.10.01 (1/2 journée) The CERN Engineering Data Management System for Electronics Design :  30.10.01 (1 day) UNIX pour non-programmeurs : 5 - 7.11.01 (3 jours) The Java programming language Level 1: 8 - 9.11.01 (2 days) LabView Base 1 : 12 - 14.11.01 (3 jours) Introduction to PERL 5 :  15 - 16.11.01  (2 days) Introduction to XML :  19 - 20.11.01 (2 days) Programming TSX Premium 1 :  19 - 23.11.01  (5 days) Introduction to C Programming :  21- 23.11.01 (3 days) The Java programming language Level 2:  26 - 28.11.01 (...

  3. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: EXCEL 2000 - niveau 1 : 3 et 4.10.01 (2 jours) Automates et réseaux de terrain : 3 - 4.10.2001 (2 jours) Introduction à Outlook : 5.10.01 (1 journée) C++ for Particle Physicists : 8 - 12.10.01 (6 lectures) Cadence Board Design tools : Upgrading to release 14 : 3 1-day sessions on 9, 10 & 11.10.01 MS-Project 2000 - niveau 1 : 15 - 18.10.01 (4 demi-journées) LabView Base 2 : 18 & 19.10.01 (2 jours) WORD 2000 : importer et manipuler des images : 19.10.01 (1 journée) The CERN Engineering Data Management System for Electronics Design :  30.10.01 (1 day) UNIX pour non-programmeurs : 5 - 7.11.01 (3 jours) The Java programming language Level 1: 8 - 9.11.01 (2 days) Introduction to PERL 5 :  15 - 16.11.01  (2 days) Introduction to XML :  19 - 20.11.01 (2 days) Programming TSX Premium 1 :  19 - 23.11.01  (5 days) Introd...

  4. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: MS-Project 2000 - niveau 1 : 15 - 18.10.01 (4 demi-journées) LabView Base 2 : 18 & 19.10.01 (2 jours) WORD 2000 : importer et manipuler des images : 19.10.01 (1 journée) Contract Follow-up (F) : 30.10.01 (1/2 journée) The CERN Engineering Data Management System for Electronics Design :  30.10.01 (1 day) UNIX pour non-programmeurs : 5 - 7.11.01 (3 jours) The Java programming language Level 1: 8 - 9.11.01 (2 days) LabView Base 1 : 12 - 14.11.01 (3 jours) Automates et réseaux de terrain : 13 & 14.11.01 (2 jours) Introduction to PERL 5 :  15 - 16.11.01  (2 days) Introduction to XML :  19 - 20.11.01 (2 days) Programming TSX Premium 1 :  19 - 23.11.01  (5 days) Introduction to C Programming :  21- 23.11.01 (3 days) The Java programming language Level 2:  26 - 28.11.01 (3 days) Programmation TSX Premium 2 : 26 ...

  5. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: Introduction to Oracle 8i : SQL and PL/SQL:  7 - 11.10.02  (5 days) CLEAN-2002 : Working in a Cleanroom (free of charge):  10.10.02  (half-day, p.m.) AutoCAD 2002 - niveau 2 :  14 - 15.10.02  (2 jours) Introduction à DesignSpace :  16.10.02  (1 journée) Introduction to DesignSpace:  17.10.02  (1 day) AutoCAD 2002 - Level 1:  17, 18, 24, 25.10.02  (4 days) AutoCAD Mechanical 6 PowerPack (F) :  21, 22, 23.10 et 4, 5, 6.11.02  (6 jours) Introduction à ANSYS/Introduction to ANSYS (langue à définir suivant demande/ Language to be chosen according to demand):  21 - 25.10.02  (5 jours/days) HREF-2002: Helium Refrigeration Techniques (English-French, bilingual) :  21 - 25.10.2002  (7 half days) HREF-2002: Techniques de la Réfri...

  6. Places available**

    CERN Document Server

    2003-01-01

    Places are available in the following courses : The CERN EDMS for Local Administrators : 24 & 25.9.03 (2 days, free of charge) HeREF-2003 : Techniques de la réfrigération Hélium (cours en français avec support en anglais) : 6 - 10.10.2003 (7 demi-journées) The Java Programming Language Level 1 : 6 - 7.10.2003 (2 days) Java 2 Enterprise Edition - Part 2 : Enterprise JavaBeans : 8 - 10.10.2003 (3 days) FileMaker - niveau 1 : 9 & 10.10.03 (2 jours) EXCEL 2000 - niveau 1 : 20 & 22.10.03 (2 jours) AutoCAD 2002 - niveau 1 : 20, 21, 27, 28.10.03 (4 jours) CLEAN-2002 : Working in a Cleanroom : 23.10.03 (half day, free of charge) AutoCAD 2002 - Level 1 : 3, 4, 12, 13.11.03 (4 days) AutoCAD 2002 - niveau 2 : 10 & 11.11.03 (2 jours) ACCESS 2000 - niveau 1 : 13 & 14.11.03 (2 jours) AutoCAD Mechanical 6 PowerPack (E) : 17, 18, 24, 25.11 & 1, 2.12.03 (6...

  7. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: Introduction à DesignSpace :  16.10.02  (1 journée) AutoCAD Mechanical 6 PowerPack (F) :  21, 22, 23.10 et 4, 5, 6.11.02  (6 jours) Introduction à ANSYS 21 - 25.10.02  (5 jours/days) HREF-2002: Helium Refrigeration Techniques (English-French, bilingual) :  21 - 25.10.2002  (7 half days) LabVIEW Basics 1 (English):  21 - 23.10.02  (3 days) LabVIEW Basics 2 (English):  24 & 25.10.02  (2 days) Oracle 8i : Access the Database with Java:  7 & 8.11.02  (2 days) AutoCAD 2002 - niveau 2 :  7 & 8.11.02  (2 jours) AutoCAD 2002 - Level 1:  14, 15, 21, 22.11.02  (4 days) LabVIEW - Advanced (English) :  18 - 20.11.2002  (3 days) AutoCAD 2002 - niveau 1 :  19, 20, 25, 26.11.02 (4 jours) Oracle iDS Designer: First Class:&...

  8. Places available**

    CERN Document Server

    2003-01-01

    Places are available in the following courses: CLEAN-2002 : Travailler en salle blanche (séminaire gratuit) : 4.9.03 (une demi-journée) The CERN EDMS for Local Administrators (free of charge) : 24 & 25.9.03 (2 days) HeREF-2003 : Techniques de la réfrigération Hélium (cours en français avec support en anglais) : 6 - 10.10.2003 (7 demi-journées) The Java Programming Language Level 1 : 6 - 7.10.2003 (2 days) Java 2 Enterprise Edition - Part 2 : Enterprise JavaBeans : 8 - 10.10.2003 (3 days) FileMaker - niveau 1 : 9 & 10.10.03 (2 jours) EXCEL 2000 - niveau 1 : 20 & 22.10.03 (2 jours) AutoCAD 2002 - niveau 1 : 20, 21, 27, 28.10.03 (4 jours) CLEAN-2002 : Working in a Cleanroom (free of charge) : 23.10.03 (half day) AutoCAD Mechanical 6 PowerPack (E) : 23, 24, 30, 31.10 & 12, 13.11.03 (6 days) AutoCAD 2002 - niveau 2 : 10 & 11.11.03 (2 jours)...

  9. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: LabView hands-on (bilingue/bilingual): 5.11.02 (matin/morning) LabView DAQ hands-on (bilingue/bilingual):  5.11.02  (après-midi afternoon) Introduction au PC et Windows 2000 au CERN:  6 & 7.11.02  (2 jours) Oracle 8i : Access the Database with Java:  7 & 8.11.02  (2 days) AutoCAD 2002 - niveau 2:  7 & 8.11.02  (2 jours) Introduction to PVSS (free of charge):  11.11.2002 pm  (1/2 day) Basic PVSS:  12 - 14.11.02  (3 days) EXCEL 2000 - niveau 1:  12 & 13.11.02  (2 jours) CLEAN-2002: Working in a Cleanroom (English, free of charge):  13.11.2002  (afternoon) LabView Base 1 :  13 - 15.11.02  (3 jours) AutoCAD 2002 - Level 1:  14, 15, 21, 22.11.2002  (4 days) LabVIEW - Advanced:  18 - 20.11.02  (3 days) Auto...

  10. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses: The CERN EDMS for Local Administrators (free of charge) : 24 & 25.9.03 (2 days) HeREF-2003 : Techniques de la réfrigération Hélium (cours en français avec support en anglais) : 6 - 10.10.2003 (7 demi-journées) The Java Programming Language Level 1 : 6 - 7.10.2003 (2 days) Java 2 Enterprise Edition - Part 2 : Enterprise JavaBeans : 8 - 10.10.2003 (3 days) FileMaker - niveau 1 : 9 & 10.10.03 (2 jours) EXCEL 2000 - niveau 1 : 20 & 22.10.03 (2 jours) AutoCAD 2002 - niveau 1 : 20, 21, 27, 28.10.03 (4 jours) CLEAN-2002 : Working in a Cleanroom (free of charge) : 23.10.03 (half day) AutoCAD Mechanical 6 PowerPack (E) : 23, 24, 30, 31.10 & 12, 13.11.03 (6 days) AutoCAD 2002 - niveau 2 : 10 & 11.11.03 (2 jours) ACCESS 2000 - niveau 1 : 13 & 14.11.03 (2 jours) FrontPage 2000 - niveau 1 : 20...

  11. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: LabView Base 1 :  23 - 25.9.02  (3 jours) Object-Oriented Analysis & Design using UML:  25 - 27.9.02  (3 days) LabView DAQ (E):  26 - 27.9.02  (2 days) Introduction to Oracle 8i : SQL and PL/SQL:  7 - 11.10.02  (5 days) CLEAN-2002 : Working in a Cleanroom (free of charge):  10.10.02  (half-day, p.m.) AutoCAD 2002 - niveau 2 :  14 - 15.10.02  (2 jours) Introduction à DesignSpace :  16.10.02  (1 journée) Introduction to DesignSpace:  17.10.02  (1 day) AutoCAD 2002 - Level 1:  17, 18, 24, 25.10.02  (4 days) AutoCAD Mechanical 6 PowerPack (F) :  21, 22, 23.10 et 4, 5, 6.11.02  (6 jours) Introduction à ANSYS/Introduction to ANSYS (langue à définir suivant demande/ Language to be chosen according to demand):...

  12. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: Java 2 Enterprise Edition - Part 2: Enterprise JavaBeans:  18 - 20.9.02  (3 days) AutoCAD 2002 - niveau 1 :  19, 20, 26, 27.9.02  (4 jours) LabView Base 1 :  23 - 25.9.02  (3 jours) Object-Oriented Analysis & Design using UML:  25 - 27.9.02  (3 days) LabView DAQ (E):  26 - 27.9.02  (2 days) Introduction to Oracle 8i : SQL and PL/SQL:  7 - 11.10.02  (5 days) CLEAN-2002 : Working in a Cleanroom (free of charge):  10.10.02  (half-day, p.m.) AutoCAD 2002 - niveau 2 :  14 - 15.10.02  (2 jours) Introduction à DesignSpace :  16.10.02  (1 journée) Introduction to DesignSpace:  17.10.02  (1 day) AutoCAD 2002 - Level 1:  17, 18, 24, 25.10.02  (4 days) AutoCAD Mechanical 6 PowerPack (F) :  21, 22, 23.10 et 4, 5, 6.11....

  13. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Contract Follow-up (F) : 30.10.01 (1/2 journée) The CERN Engineering Data Management System for Electronics Design :  30.10.01 (1 day) UNIX pour non-programmeurs : 5 - 7.11.01 (3 jours) Nouveautés d'EXCEL : 5.11.01 (1/2 journée) Introduction a Windows 2000 au CERN : 6.11.01 (1/2 journée) The Java programming language Level 1: 8 - 9.11.01 (2 days) LabView Base 1 : 12 - 14.11.01 (3 jours) Automates et réseaux de terrain : 13 & 14.11.01 (2 jours) Introduction to PERL 5 :  15 - 16.11.01  (2 days) Introduction to XML :  19 - 20.11.01 (2 days) Programming TSX Premium 1 :  19 - 23.11.01  (5 days) Introduction to C Programming :  21- 23.11.01 (3 days) The Java programming language Level 2:  26 - 28.11.01 (3 days) Programmation TSX Premium 2 : 26 - 30.11.01 (5 jours) Autocad Migration support courses: a detail...

  14. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Contract Follow-up (F) : 30.10.01 (1/2 journée) The CERN Engineering Data Management System for Electronics Design :  30.10.01 (1 day) Nouveautés d'Excel 2000 : 5.11.01 (1/2 journée) UNIX pour non-programmeurs : 5 - 7.11.01 (3 jours) Introduction à Windows 2000 au CERN : 6.11.01 (1/2 journée) The Java programming language Level 1: 8 - 9.11.01 (2 days) LabView Base 1 : 12 - 14.11.01 (3 jours) LabVIEW DAQ (F) : 15 & 16.11.01 (2 jours) Automates et réseaux de terrain : 13 & 14.11.01 (2 jours) Introduction to PERL 5 :  15 - 16.11.01  (2 days) LabVIEW - DAQ : 15 - 16.11.01 (2 jours) Introduction to XML :  19 - 20.11.01 (2 days) Introduction to C Programming :  21- 23.11.01 (3 days) Programmation TSX Premium 2 : 26 - 30.11.01 (5 jours) Object-Oriented Analysis and Design :  27 - 30.11.2001 (4 days) Hands...

  15. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Nouveautés d'EXCEL : 5.11.01 (1/2 journée) Introduction a Windows 2000 au CERN : 6.11.01 (1/2 journée) UNIX pour non-programmeurs : 5 - 7.11.01 (3 jours) Design Patterns :  7 - 8.11.01 (2 days) The Java programming language Level 1: 8 - 9.11.01 (2 days) Automates et réseaux de terrain : 13 & 14.11.01 (3 jours) Introduction à Windows 2000 au CERN : 12 - 14.11.01 (1/2 journée) Introduction to Windows 2000 at CERN :  14.11.01  (half-day) Introduction to PERL 5 :  15 - 16.11.01  (2 days) Introduction to C Programming :  21- 23.11.01 (3 days) Programmation TSX Premium 2 : 26 - 30.11.01 (5 jours) Contract Follow-up (F) : 26.11.01 (1/2 journée) Object-Oriented Analysis and Design :  27 - 30.11.2001  (4 days) Hands-on Object-Oriented Design and Programming with C++ :  11 - 13.12.2...

  16. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: LabVIEW Basics 2: 13 & 14.5.02 (2 days) WorldFIP - Généralités : 14.5.2002 (1/2 journée) WorldFIP - Développer avec MicroFIP HANDLER : 14.5 - après-midi, 15.5.02 - matin (1 jour) WorldFIP - FullFIP FDM : FIP Device Manager (F) : 15.5 - après-midi, 16.5.02 - matin (1 jour) LabVIEW DAQ (F) : 15 & 16.5.02 (2 jours) EXCEL 2000 - niveau 2 : 22 & 23.5.02 (2 jours) The CERN Engineering Data Management System for Advanced users:  30.5.02  (1 day) LabVIEW Basics 1:  3 - 5.6.02  (3 days) AutoCAD 2002 - condensé : 4 - 6.6.02 (3 jours) LabVIEW DAQ (E):  6 & 7.6.02  (2 days) AutoCAD 2002 - Level 1:  10 - 12 and 24 - 26.6.02  (6 days) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the c...

  17. Model-based mitigation of availability risks

    NARCIS (Netherlands)

    Zambon, E.; Bolzoni, D.; Etalle, S.; Salvato, M.

    2007-01-01

    The assessment and mitigation of risks related to the availability of the IT infrastructure is becoming increasingly important in modern organizations. Unfortunately, present standards for risk assessment and mitigation show limitations when evaluating and mitigating availability risks. This is due

  18. Model-Based Mitigation of Availability Risks

    NARCIS (Netherlands)

    Zambon, Emmanuele; Bolzoni, D.; Etalle, Sandro; Salvato, Marco

    2007-01-01

    The assessment and mitigation of risks related to the availability of the IT infrastructure is becoming increasingly important in modern organizations. Unfortunately, present standards for Risk Assessment and Mitigation show limitations when evaluating and mitigating availability risks. This is due

  19. Availability Improvement of German Nuclear Power Plants

    International Nuclear Information System (INIS)

    Wilhelm, Oliver

    2008-01-01

    High availability is important for the safety and economical performance of Nuclear Power Plants (NPP). The strategy for availability improvement in a typical German PWR shall be discussed here. Key parameters for strategy development are plant design, availability of safety systems, component reliability, preventive maintenance and outage organization. Plant design, availability of safety systems and component reliability are to a greater extent given parameters that can hardly be influenced after the construction of the plant. But they set the frame for maintenance and outage organisation which have shown to have a large influence on the availability of the plant. (author)

  20. 78 FR 22529 - Notice of Availability of Government-Owned Inventions; Available for Licensing

    Science.gov (United States)

    2013-04-16

    ... DEPARTMENT OF DEFENSE Department of the Navy Notice of Availability of Government-Owned Inventions... below are assigned to the United States Government as represented by the Secretary of the Navy and are...: ANALYTICAL RECONSTRUCTION OF DIGITAL SIGNALS VIA STITCHED POLYNOMIAL FITTING//Navy Case No. 101761: APPARATUS...

  1. Offshore wind turbines reliability, availability and maintenance

    CERN Document Server

    Tavner, Peter

    2012-01-01

    The first book to specifically focus on offshore wind turbine technology and which addresses practically wind turbine reliability and availability. The book draws on the author's experience of power generation reliability and availability and the condition monitoring of that plant to describe the problems facing the developers of offshore wind farms and the solutions available to them to raise availability, reduce cost of energy and improve through life cost.

  2. Assessing habitat selection when availability changes

    Science.gov (United States)

    Arthur, S.; Garner, G.; ,

    1996-01-01

    We present a method of comparing data on habitat use and availability that allows availability to differ among observations. This method is applicable when habitats change over time and when animals are unable to move throughout a predetermined study area between observations. We used maximum-likelihood techniques to derive an index that estimates the probability that each habitat type would be used if all were equally available. We also demonstrate how these indices can be used to compare relative use of available habitats, assign them ranks, and assess statistical differences between pairs of indices. The set of these indices for all habitats can be compared between groups of animals that represent different seasons, sex or age classes, or experimental treatments. This method allows quantitative comparisons among types and is not affected by arbitrary decisions about which habitats to include in the study. We provide an example by comparing the availability of four categories of sea ice concentration to their use by adult female polar bears, whose movements were monitored by satellite radio tracking in the Bering and Chukchi Seas during 1990. Use of ice categories by bears was nonrandom, and the pattern of use differed between spring and late summer seasons.

  3. Availability of periodically tested systems

    International Nuclear Information System (INIS)

    Signoret, J.P.

    1979-01-01

    There is at the present time a need in accurate models to asess the availability of periodically tested stand-by systems. This paper shows how to improve the well known 'saw-tooth curve' model in order to take into account various reliability parameters. A model is developed to assess the pointwise and the mean availabilities of periodically tested stand-by systems. Exact and approxination formulae are given. In addition, the model developed herein leads to optimize the test interval in order to minimize the mean unavailability. A safety diesel in a nuclear power plant is given as an example

  4. 76 FR 30322 - Notice of Availability of Government-Owned Inventions; Available for Licensing

    Science.gov (United States)

    2011-05-25

    ... DEPARTMENT OF DEFENSE Department of the Navy Notice of Availability of Government-Owned Inventions... below are assigned to the United States Government as represented by the Secretary of the Navy. U.S...'' issued on February 16, 2010; U.S. Patent Number 6,600,694 entitled ``Digital Signal Processor Based...

  5. Management and communication courses – places available

    CERN Multimedia

    2012-01-01

    There are places available in some management and communication courses starting before the end of the year. For more information on the course, click on the course title, which will bring you to the training catalogue. You can then sign-up on line.  For advice, you can contact:   Erwin Mosselmans, tel. 74125, erwin.mosselmans@cern.ch   Nathalie Dumeaux, tel. 78144, nathalie.dumeaux@cern.ch Course Dates Duration Language Availability Conflict Resolution for Managers 12-13 November 2 days English 6 places available Communicating to Convince 13-14 November 16 hours English 4 places available Orientation Service 27 and 29 November 2 days French 2 places available  

  6. Running high availability services in hybrid cloud

    OpenAIRE

    Dzekunskas, Karolis

    2018-01-01

    IT infrastructure is now expanding rapidly. Many enterprises are thinking of migration to the cloud to increase the time of service availability. High availability services and advanced technologies let to find flexible and scalable balance between resources and costs. The aim of this work is to prove that high availability services in hybrid cloud are secure, flexible, optimized and available to anyone. This paperwork provides detailed explanation about the imitation of two datacenters with ...

  7. 76 FR 1059 - Publicly Available Mass Market Encryption Software and Other Specified Publicly Available...

    Science.gov (United States)

    2011-01-07

    ... controlled for anti-terrorism reasons, and requires a license for export to Iran, Cuba, Syria, Sudan and... concepts concerning publicly available encryption software can be found in more appropriate parts of the...

  8. 77 FR 9961 - Notice of Availability

    Science.gov (United States)

    2012-02-21

    ... Wrangell-St. Elias National Park and Preserve. Public Availability: This plan of operations is available for inspection during normal business hours at the following locations: Wrangell-St. Elias National... accordance with the provisions of 36 CFR 9.17, Randy Elliott has filed a proposed plan of operations to...

  9. 76 FR 375 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Science.gov (United States)

    2011-01-04

    ... comprehensive projects that address the problems of concentrated rural housing distress and community poverty... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-35] Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Rural Innovation Fund Program...

  10. 75 FR 66385 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year 2010; Special Needs...

    Science.gov (United States)

    2010-10-28

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-31] Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year 2010; Special Needs Assistance Programs (SNAPS... information, and other requirements for the Fiscal Year (FY) 2010 Special Needs Assistance Programs Technical...

  11. Challenges to implementing "best available science"

    Science.gov (United States)

    Vita Wright

    2010-01-01

    Interagency wildland fire policy directs manager to apply "best available science" to management plans and activities. But what does "best available science" mean? With a vague definition of this concept and few guidelines for delivering or integrating science into management, it can be difficult for scientists to effectively provide managers with...

  12. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Introduction à Windows 2000 au CERN : 2 sessions de _ journée les 24 et 25.9.01 PROFIBUS : 25 - 26.9.01 (2 jours) PROFIBUS : 27 - 28.9.01 (2 days) EXCEL 2000 - niveau 1 : 3 et 4.10.01 (2 jours) Automates et réseaux de terrain : 3 - 4.10.2001 (2 jours) Introduction à Outlook : 5.10.01 (1 journée) Frontpage 2000 - niveau 1 : 8 et 9.10.01 (2 jours) C++ for Particle Physicists : 8 - 12.10.01 (6 lectures) MS-Project 2000 - niveau 1 : 15 - 18.10.01 (4 demi-journées) Programmation TSX Premium 1 : 15 - 19.10.01 (5 jours) WORD 2000 : importer et manipuler des images : 19.10.01 (1 journée) Programmation TSX Premium 1 : 22 - 26.10.01 (5 jours) UNIX pour non-programmeurs : 5 - 7.11.01 (3 jours) The Java programming language Level 1: 8 - 9.11.01 (2 days) Introduction to PERL 5 :  15 - 16.11.01  (2 days) Introduction to XML :  19 - 20.11.01 (2...

  13. PLACES AVAILABLE

    CERN Multimedia

    Technical training; Tel. 74924

    2001-01-01

    Places are available in the following courses: PROFIBUS : 25 - 26.9.01 (2 jours) PROFIBUS : 27 - 28.9.01 (2 days) Automates et réseaux de terrain : 3 - 4.10.2001 (2 jours) PCAD Schémas - débutants : 4 - 5.10.01 (2 jours) PCAD PCB - débutants : 8 - 10.10.01 (3 jours) Programmation TSX Premium 1 : 15 - 19.10.01 (5 jours) Programmation TSX Premium 1 : 22 - 26.10.01 (5 jours) Programming TSX Premium 2: 19 - 23.11.01 (5 days) Programmation TSX Premium 2 : 26 - 30.11.01 (5 jours) Autocad Migration support courses: a detailed calendar will be published shortly for this series of sessions which will start on 15.10.2001. Registration is already open AutoCAD : Mise à jour AutoCAD r-14 vers 2002 (2 jours) AutoCAD Mechanical PowerPack 6 basé sur AutoCAD 2002 (5 jours) The following LabView courses will be given in either English or French according to demand LabVIEW - Base 1 / LabVIEW - Basics 1 : 10 - 12.9.01 (3 jours / 3 days)...

  14. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : EXCEL 2000 - niveau 1 : 10 & 11.6.03 (2 jours) Conception de PCB rapides dans le flot Cadence : 11.6.03 (matin) EXCEL 2000 - level 1 : 12 & 13.6.03 (2 days) Introduction to PVSS : 16.6.03 (p.m.) Basic PVSS : 17 - 19.6.03 (3 days) Réalisation de PCB rapides dans le flot Cadence : 17.6.03 (matin) PVSS - JCOP Framework Tutorial : 20.6.03 (1 day) EXCEL 2000 - niveau 2 : 24 & 25.6.03 (2 jours) Siemens SIMATIC Training : Introduction to STEP7 : 3 & 4.6.03 (2 jours/2 days) STEP7 Programming : 16 - 20.6.03 (5 jours/5 days) Simatic Net Network : 26 & 27.6.03 (2 jours/2 days) These courses will be given in French or English following the requests. Programmation automate Schneider : Programmation automate Schneider TSX Premium - 1er niveau : 10 - 13.6.03 (4 jours) - audience : toute personne qui veux maitriser la msie en uvre et la programmation d'un automate TSX Premium - objectifs : maitriser la mise en uvre et la programmation d'un autom...

  15. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: Introduction à Windows 2000 au CERN : 2 sessions de _ journée les 24 et 25.9.01 PROFIBUS : 25 - 26.9.01 (2 jours) PROFIBUS : 27 - 28.9.01 (2 days) PowerPoint 2000 : 1 et 2.10.01 (2 jours) EXCEL 2000 - niveau 1 : 3 et 4.10.01 (2 jours) Automates et réseaux de terrain : 3 - 4.10.2001 (2 jours) PCAD Schémas - débutants : 4 - 5.10.01 (2 jours) Introduction à Outlook : 5.10.01 (1 journée) Frontpage 2000 - niveau 1 : 8 et 9.10.01 (2 jours) PCAD PCB - débutants : 8 - 10.10.01 (3 jours) C++ for Particle Physicists : 8 - 12.10.01 (6 3-hour lectures) MS-Project 2000 - niveau 1 : 15 - 18.10.01 (4 demi-journées) LabView Basics 1 :  15 - 17.10.01  (3 days) Programmation TSX Premium 1 : 15 - 19.10.01 (5 jours) WORD 2000 : importer et manipuler des images : 19.10.01 (1 journée) Programmation TSX Premium 1 : 22 - 26.10.01...

  16. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures) Oracle iDS Reports : Build Internet Reports : 5 - 9.5.03 (5 days) LabView DAQ (language to be defined) : 8 & 9.5.03 AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 20, 21, 27 & 28.5.03 (6 jours) AutoCAD 2002 - niveau 2 : 3 & 4.6.03 (2 jours) LabView DSC (language to be defined) : 19 & 20.6.03 Siemens SIMATIC Training : Introduction to STEP7 : 3 & 4.6.03 (2 days) STEP7 Programming : 16 - 20.6.03 (5 days) Simatic Net Network : 15 & 16.4.03 / 26 & 27.6.03 (sessions of 2 days) These courses will be given in French or English following the requests. Cours de sécurité : Etre TSO au CERN : Prochaines sessions : 24, 25 & 27.6.03 - 4, 5 & 7.11.03 (session de 3 jours) If you wish to participate in one of these courses, please discuss with your supervisor and apply electronically directly from the course description ...

  17. Places available **

    CERN Multimedia

    2003-01-01

    Des places sont disponibles dans les cours suivants : Places are available in the following courses : C++ for Particle Physicists : 10 - 14.3.03 (6 X 3-hour lectures) Introduction to PVSS : 10.3.03 (half day, afternoon) Basic PVSS : 11 - 13.3.03 (3 days) PVSS - JCOP Framework Tutorial : 14.3.03 (1 day) CLEAN-2002 : Working in a cleanroom : 2.4.03 (half-day, afternoon, free course, registration required) LabView base 1/LabView Basics 1 : 9 - 11.4.03 (3 jours/3 days) Langue à définir/language to be decided DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures) AutoCAD 2002 - niveau 1 : 29, 30.4 et 7, 8.5.03 (4 jours) AutoCAD 2002 - niveau 2 : 5 & 6.5.03 (2 jours) AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 20, 21, 27 & 28.5.03 (6 jours) Formation Siemens SIMATIC /Siemens SIMATIC Training : Introduction à STEP7 /Introduction to STEP7 : 11 & 12.3.03 / 3 & 4.6.03 (2 jours/2 days) Programmation STEP7/STEP7 Programming : 31.3 - 4.4.03 / 16...

  18. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: ELEC-2002 : Spring Term :  9, 11, 16, 18, 23, 25, 30.4.02 (7 * 2.5 hours) Object-Oriented Analysis & Design: 16 - 19.4.02  (4 days) The CERN Engineering Data Management System for Advanced users:  16.4.02  (1 day) Migration from AutoCAD 14 towards AutoCAD Mechanical6 PowerPack:  17 - 19.4 and 2 &3.5.02  (5 days) AutoCAD - niveau 1 : 22, 23, 29, 30.4 et 6, 7.5.02 (6 jours) LabVIEW base 1 : 22 - 24.4.02 (3 jours) CLEAN 2002 : working in a cleanroom:  24.4.02  (half-day, pm) LabVIEW DSC (F) 25 & 26.4.02 (2 jours) AutoCAD : Mise à jour AutoCAD r-14 vers 2002 : 25 & 26.4.02 (2 jours) Cotations selon les normes GPS de l'ISO : 29 - 30.4.02 (2 jours) Introduction to the CERN Engineering Data Management System:  7.5.02  (1 day) LabVIEW Basics 2 : 13 & 14.5.02 (2 days) AutoCAD Mechanical 6 PowerPack (F) : 13-...

  19. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: Introduction to the CERN Engineering Data Management System:  7.5.02  (1 day) LabVIEW Basics 2: 13 & 14.5.02 (2 days) AutoCAD Mechanical 6 PowerPack (F) : 13-14, 17, 21, 27-28.5.02 (6 jours) WorldFIP - Généralités : 14.5.2002 (1/2 journée) WorldFIP - Développer avec MicroFIP HANDLER : 14.5 - après-midi, 15.5.02 - matin (1 jour) WorldFIP - FullFIP FDM : FIP Device Manager (F) : 15.5 - après-midi, 16.5.02 - matin (1 jour) LabVIEW DAQ (F) : 15 & 16.5.02 (2 jours) EXCEL 2000 - niveau 2 : 22 & 23.5.02 (2 jours) The CERN Engineering Data Management System for Advanced users:  30.5.02  (1 day) LabVIEW Basics 1:  3 - 5.6.02  (3 days) AutoCAD 2002 - condensé : 4 - 6.6.02 (3 jours) LabVIEW DAQ (E):  6 & 7.6.02  (2 days) AutoCAD 2002 - Level 1:  10 - ...

  20. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: The CERN Engineering Data Management System for Advanced users : 16.4.02  (1 day) Migration from AutoCAD 14 towards AutoCAD Mechanical6 PowerPack:  17 - 19.4 and 2 &3.5.02  (5 days) AutoCAD - niveau 1 : 22, 23, 29, 30.4 et 6, 7.5.02 (6 jours) LabVIEW base 1 : 22 - 24.4.02 (3 jours) CLEAN 2002 : working in a cleanroom:  24.4.02  (half-day, pm) LabVIEW DSC (F) 25 & 26.4.02 (2 jours) AutoCAD : Mise à jour AutoCAD r-14 vers 2002 : 25 & 26.4.02 (2 jours) Cotations selon les normes GPS de l'ISO : 29 - 30.4.02 (2 jours) Introduction to the CERN Engineering Data Management System:  7.5.02  (1 day) LabVIEW Basics 2: 13 & 14.5.02 (2 days) AutoCAD Mechanical 6 PowerPack (F) : 13-14, 17, 21, 27-28.5.02 (6 jours) WorldFIP - Généralités : 14.5.2002 (1/2 journée) WorldFIP - Développer avec Micr...

  1. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: LabVIEW base 1 : 22 - 24.4.02 (3 jours) CLEAN 2002 : working in a cleanroom:  24.4.02  (half-day, pm) LabVIEW DSC (F) 25 & 26.4.02 (2 jours) AutoCAD : Mise à jour AutoCAD r-14 vers 2002 : 25 & 26.4.02 (2 jours) Cotations selon les normes GPS de l'ISO : 29 - 30.4.02 (2 jours) Introduction to the CERN Engineering Data Management System:  7.5.02  (1 day) LabVIEW Basics 2: 13 & 14.5.02 (2 days) AutoCAD Mechanical 6 PowerPack (F) : 13-14, 17, 21, 27-28.5.02 (6 jours) WorldFIP - Généralités : 14.5.2002 (1/2 journée) WorldFIP - Développer avec MicroFIP HANDLER : 14.5 - après-midi, 15.5.02 - matin (1 jour) WorldFIP - FullFIP FDM : FIP Device Manager (F) : 15.5 - après-midi, 16.5.02 - matin (1 jour) LabVIEW DAQ (F) : 15 & 16.5.02 (2 jours) EXCEL 2000 - niveau 2 : 22 & 23.5.02 (2 jours)...

  2. Iron and zinc availability in maize lines

    Directory of Open Access Journals (Sweden)

    Valéria Aparecida Vieira Queiroz

    2011-09-01

    Full Text Available The aim of this study was to characterize the Zn and Fe availability by phytic acid/Zn and phytic acid/Fe molar ratios, in 22 tropical maize inbred lines with different genetic backgrounds. The Zn and Fe levels were determined by atomic absorption spectrophotometry and the P through colorimetry method. Three screening methods for phytic acid (Phy analysis were tested and one, based on the 2,2'-bipyridine reaction, was select. There was significant variability in the contents of zinc (17.5 to 42 mg.kg-1, iron (12.2 to 36.7 mg.kg-1, phosphorus (230 to 400 mg.100 g-1, phytic acid (484 to 1056 mg.100 g-1, phytic acid P (140 to 293 mg.100 g-1 and available-P (43.5 to 199.5 mg.100 g-1, and in the available-P/total-P ratio (0.14 to 0.50, Phy/Zn (18.0 to 43.5 and Phy/Fe (16.3 to 45.5 molar ratios. Lines 560977, 560978 and 560982 had greater availability of Zn and lines 560975, 560977, 561010 and 5610111 showed better Fe availability. Lines 560975, 560977 and 560978 also showed better available-P/total-P ratio. Thus, the lines 560975, 560977 and 560978 were considered to have the potential for the development of cultivars of maize with high availability of Fe and/or Zn.

  3. 76 FR 37795 - Notice of Availability of Government-Owned Inventions; Available for Licensing

    Science.gov (United States)

    2011-06-28

    ... DEPARTMENT OF DEFENSE Department of the Navy Notice of Availability of Government-Owned Inventions....S. Patent No. 7,316,194: Rudders for High-Speed Ships//U.S. Patent No. 7,322,786: Mobile Loader for Transfer of Containers Between Delivery Vehicles and Marine Terminal Cranes//U.S. Patent No. 7,324,016...

  4. Land availability for biofuel production.

    Science.gov (United States)

    Cai, Ximing; Zhang, Xiao; Wang, Dingbao

    2011-01-01

    Marginal agricultural land is estimated for biofuel production in Africa, China, Europe, India, South America, and the continental United States, which have major agricultural production capacities. These countries/regions can have 320-702 million hectares of land available if only abandoned and degraded cropland and mixed crop and vegetation land, which are usually of low quality, are accounted. If grassland, savanna, and shrubland with marginal productivity are considered for planting low-input high-diversity (LIHD) mixtures of native perennials as energy crops, the total land availability can increase from 1107-1411 million hectares, depending on if the pasture land is discounted. Planting the second generation of biofuel feedstocks on abandoned and degraded cropland and LIHD perennials on grassland with marginal productivity may fulfill 26-55% of the current world liquid fuel consumption, without affecting the use of land with regular productivity for conventional crops and without affecting the current pasture land. Under the various land use scenarios, Africa may have more than one-third, and Africa and Brazil, together, may have more than half of the total land available for biofuel production. These estimations are based on physical conditions such as soil productivity, land slope, and climate.

  5. [Availability of condoms in Mexico City].

    Science.gov (United States)

    Hernández-Girón, C; Cruz-Valdez, A; Quiterio-Trenado, M; Avila-Burgos, L; Peruga, A; Hernández-Avila, M

    2001-12-01

    At the beginning of 1999, Mexico occupied third place, after USA and Brazil, in the number of accumulated cases of AIDS (38,390 notified cases) in America. More than 80% of the cases corresponded to men between 20 and 44 years old. The transmission by sexual route has increased in both sexes, the proportion of men infected by sexual contact increased from 85% in 1991 to 90% in 1998 and in women this proportion increased from 41% in 1991 to 57% in 1998. The ratio male/female of cases of AIDS has varied from 17:1 in 1983 to 6:1 in 1998. Condom use is considered an effective method for the prevention of the transmission of STI's/HIV and therefore the availability is of paramount importance to promote use with the finality of combating these diseases. A simple randomized sampling was done in 612 establishments that included: drugstore, bars and nightclubs, hotels and motels, self-service shops and health centers in Mexico City, where am cross sectional study was performed during June and July of 1995, to evaluate the availability of condoms considering three important items: a) percent per capita required to buy an annual endowment of 100 condoms in comparison with this same indicator reported in other countries; b) physical availability, on behalf of the Secretaría de Salud, Mexico City, that considers the volume of existing condoms to be utilized for a year by the public sector in this city; c) physical availability of condoms in different evaluated locations. In order to purchase an annual supply of condoms an individual needs the assign $500 (Pesos) which represents 2.3 to 2.6% of the annual GNP per capita for 1998 and 1997 respectively. The physical availability of condoms, on behalf of the Secretaría de Salud, Mexico City, was 94.9% in health centers. In drugstores, hotels and motels, self-service shops, bars and nightclubs the availability of condoms was 100%, 82.9%, 75% and 1.2%, respectively. It has been documented that the adequate use of condom is an

  6. 75 FR 59282 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Continuum...

    Science.gov (United States)

    2010-09-27

    ... and the HUD's Fiscal Year 2010 Notice of Funding Availability (NOFA) Policy Requirements and General...: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Continuum of Care (CoC) Homeless... (Pub. L. 111-117, approved December 16, 2009). Carried over or recaptured funds from previous fiscal...

  7. 36 CFR 10.1 - Animals available.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Animals available. 10.1 Section 10.1 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR DISPOSAL OF CERTAIN WILD ANIMALS § 10.1 Animals available. From time to time there are surplus live elk...

  8. 20 CFR 402.45 - Availability of records.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Availability of records. 402.45 Section 402.45 Employees' Benefits SOCIAL SECURITY ADMINISTRATION AVAILABILITY OF INFORMATION AND RECORDS TO THE..., and, to the extent practicable, the records will be made available on the Internet or by other...

  9. Distributed intelligence improves availability

    International Nuclear Information System (INIS)

    Einholf, C.W.; Ciaramitaro, W.

    1982-01-01

    The new generation of instrumentation which is being developed to monitor critical variables in nuclear power plants is described. Powerful, compact microprocessors have been built into monitors to simplify data display. Some of the benefits of digital systems are improved plant availability, reduction in maintenance costs, reduction in manpower, lessening of test times and less frequent inspection and overhaul. (U.K.)

  10. Trophically available metal - A variable feast

    International Nuclear Information System (INIS)

    Rainbow, Philip S.; Luoma, Samuel N.; Wang Wenxiong

    2011-01-01

    Assimilation of trace metals by predators from prey is affected by the physicochemical form of the accumulated metal in the prey, leading to the concept of a Trophically Available Metal (TAM) component in the food item definable in terms of particular subcellular fractions of accumulated metal. As originally defined TAM consists of soluble metal forms and metal associated with cell organelles, the combination of separated fractions which best explained particular results involving a decapod crustacean predator feeding on bivalve mollusc tissues. Unfortunately TAM as originally defined has subsequently frequently been used in the literature as an absolute description of that component of accumulated metal that is trophically available in all prey to all consumers. It is now clear that what is trophically available varies between food items, consumers and metals. TAM as originally defined should be seen as a useful starting hypothesis, not as a statement of fact. - Trophically Available Metal (TAM), the component of accumulated metal in food that is taken up by a feeding animal, varies with food type and consumer.

  11. Trophically available metal - A variable feast

    Energy Technology Data Exchange (ETDEWEB)

    Rainbow, Philip S., E-mail: p.rainbow@nhm.ac.uk [Department of Zoology, Natural History Museum, Cromwell Rd, London SW7 5BD (United Kingdom); Luoma, Samuel N. [Department of Zoology, Natural History Museum, Cromwell Rd, London SW7 5BD (United Kingdom); John Muir Institute of the Environment, University of California, Davis, CA 95616 (United States); Wang Wenxiong [College of Marine and Environmental Sciences, State Key Laboratory for Marine Environmental Sciences, Xiamen University, Fujian (China)

    2011-10-15

    Assimilation of trace metals by predators from prey is affected by the physicochemical form of the accumulated metal in the prey, leading to the concept of a Trophically Available Metal (TAM) component in the food item definable in terms of particular subcellular fractions of accumulated metal. As originally defined TAM consists of soluble metal forms and metal associated with cell organelles, the combination of separated fractions which best explained particular results involving a decapod crustacean predator feeding on bivalve mollusc tissues. Unfortunately TAM as originally defined has subsequently frequently been used in the literature as an absolute description of that component of accumulated metal that is trophically available in all prey to all consumers. It is now clear that what is trophically available varies between food items, consumers and metals. TAM as originally defined should be seen as a useful starting hypothesis, not as a statement of fact. - Trophically Available Metal (TAM), the component of accumulated metal in food that is taken up by a feeding animal, varies with food type and consumer.

  12. Technology Adoption: Influence of Availability and Accessibility

    Science.gov (United States)

    McConnell, William Stewart

    2009-01-01

    Farmers are small business leaders using available technology to remain competitive. The availability of technology is dependent on the suppliers' use of the marketing mix 4Ps theory--product, price, placement, and promotion. The purpose of this study was to determine how the relation between availability and accessibility influences the adoption…

  13. LHC Availability 2017: Standard Proton Physics

    CERN Document Server

    Todd, Benjamin; Apollonio, Andrea; Walsh, David John; CERN. Geneva. ATS Department

    2017-01-01

    This document summarises the LHC machine availability for the period from restart to the end of standard proton physics in 2017. This covers the whole standard proton physics production period. This note has been produced and ratified by the Availability Working Group which has complied fault information for the period in question using the Accelerator Fault Tracker.

  14. 25 CFR 137.2 - Availability of water.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Availability of water. 137.2 Section 137.2 Indians BUREAU... COSTS, SAN CARLOS INDIAN IRRIGATION PROJECT, ARIZONA § 137.2 Availability of water. Pursuant to section... notice to announce when water is actually available for lands in private ownership under the project and...

  15. Availability Performance Analysis of Thermal Power Plants

    Science.gov (United States)

    Bhangu, Navneet Singh; Singh, Rupinder; Pahuja, G. L.

    2018-03-01

    This case study presents the availability evaluation method of thermal power plants for conducting performance analysis in Indian environment. A generic availability model has been proposed for a maintained system (thermal plants) using reliability block diagrams and fault tree analysis. The availability indices have been evaluated under realistic working environment using inclusion exclusion principle. Four year failure database has been used to compute availability for different combinatory of plant capacity, that is, full working state, reduced capacity or failure state. Availability is found to be very less even at full rated capacity (440 MW) which is not acceptable especially in prevailing energy scenario. One of the probable reason for this may be the difference in the age/health of existing thermal power plants which requires special attention of each unit from case to case basis. The maintenance techniques being used are conventional (50 years old) and improper in context of the modern equipment, which further aggravate the problem of low availability. This study highlights procedure for finding critical plants/units/subsystems and helps in deciding preventive maintenance program.

  16. Availability study of the engineering test facility (ETF)

    International Nuclear Information System (INIS)

    Reiersen, W.T.

    1980-01-01

    Availability studies have been undertaken as part of the preconceptual design of ETF. The report discusses a simulation model developed to assess ETF availability. An assessment is made of ETF availability and operational characteristics. ETF availability drivers are identified. The impact of availability on schedule and cost is discussed

  17. Future Contracting for Availability

    Science.gov (United States)

    2016-04-30

    rising costs for its social welfare system as the population continues to age. Unless retirement and healthcare entitlement expenditures are reduced...could make better use of available government and industry resources at the system, subsystem, and component levels. In that context, outsourcing ...should be considered in functions where robust capability already exists in the private sector. Outsourcing those functions could result in a 10–15

  18. Managing spares for improved availability

    International Nuclear Information System (INIS)

    Moncrief, E.C.; Schroder, R.M.

    1987-01-01

    A recent survey by the U.S. Nuclear Regulatory Commission of maintenance practices at U.S. nuclear power plants confirms that spare parts availability is, to some extent, a problem at all but a few plants. Fortunately, significant improvement is possible without ballooning inventory. The vast majority of total dollar value of spare parts inventory at power generation stations, whether nuclear or fossil, is rarely used (parts or components that are used 12 or less times per year including many with a history of no use for many years). Because rarely used inventory is not effectively managed with traditional inventory management techniques, opportunities exist both to increase availability and to reduce investment. But this requires a unique statistical tool that can recommend an unbiased, economic reorder point to be used in the materials management system. Inventory Solutions Inc. (ISI) of Akron, Ohio, has developed such a tool, rarely used inventory stocking logic (RUSL), which is a user friendly decision support tool for setting spare parts reorder points. RUSL, based on statistical computations enhanced to include the most advanced techniques developed for use in aerospace and military combat-readiness, calculates the optimum stocking level to achieve the desired spare part availability at the station

  19. 47 CFR 90.303 - Availability of frequencies.

    Science.gov (United States)

    2010-10-01

    ... table lists frequency bands that are available for assignment in specific urban areas. The available... available for use by eligibles in the Public Safety Radio Pool in the following areas: New York City; Nassau...)” curve in Figure B in 47 CFR 90.309(b). (ii) For base stations located west of the Hudson River, Kill Van...

  20. 75 FR 4410 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year 2009 Neighborhood...

    Science.gov (United States)

    2010-01-27

    ...On May 4, 2009, HUD posted its NSP2 NOFA at http:// www.hud.gov/nsp and announced the availability of the NOFA on May 7, 2009 (74 FR 21377). The NSP2 NOFA announced the availability of approximately $1.93 billion available in competitive grants authorized under the American Recovery and Reinvestment Act of 2009 (Pub. L. 111- 5, approved February 17, 2009). HUD corrected the NSP2 NOFA by Notices posted on the HUD Web site on June 11, 2009 and November 9, 2009, and announced by Federal Register publications published on June 17, 2009 (74 FR 28715) and November 16, 2009 (74 FR 58973), respectively. Today's Federal Register publication announces that HUD has posted a notice making further corrections to the NSP2 NOFA. Specifically, the Notice corrects the NSP2 NOFA to permit HUD to specify the deadline date for submission of consortium funding agreements in the transmittal letter for the NSP2 grant agreement, which allows the submission deadline to occur after obligation of grant funds. This notice only affects applications for funding that have already been submitted to HUD by consortium applicants. HUD notes that the deadline for applications was July 17, 2009, and, as a result, will not accept new applications for funding. The notice correcting the NSP2 NOFA is available on the HUD Web site at http://www.hud.gov/recovery.

  1. PLACES AVAILABLE

    CERN Multimedia

    Enseignement Technique; Tél. 74924; Technical Training; Monique Duval; Tel. 74924

    2000-01-01

    Places are available in the following courses : Premiers pas avec votre PC 12 - 15.9.00 (4 demi-journées) WORD 20, 21 et 26, 27.9.2000 (4 jours) JAVA programming level 1 25 - 26.9.2000 (2 days) Gaz inflammables 1 26.9.2000 (1 journée) Advanced aspects of PERL 5 6.10.2000 (1 day) Initiation au WWW 10 - 12.10.00 (3 demi-journées) WORD : importer et manipuler des images 16.10.2000 (1 journée) FileMaker 17, 18 et 24, 25.10.00 (4 jours) Nouveautés de WORD 19 et 20.10.2000 (2 jours) ACCESS 1er niveau 30 - 31.10.00 (2 jours)Introduction à PowerPoint 6.11.00 (1 journée)Nouveautés d’EXCEL 7.11.2000(4 demi-journées)Excel 13, 14 et 20, 21.11.00 (4 jours) LabView hands-on 13.11.2000(4 hours)LabView Basics 1 14 - 16.11.2000 (3 days) MS-Project 1er niveau 14-17.11.00 (4 demi-journées) If you wish to participate in one of these courses, please discuss with your supervisor and apply elec...

  2. PLACES AVAILABLES

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: PVSS Basics : 20 - 24.8.01 (5 days) PROFIBUS : 25 - 26.9.01 (2 jours) PROFIBUS : 27 - 28.9.01 (2 days) PCAD Schémas - débutants : 4 - 5.10.01 (2 jours) PCAD PCB - débutants : 8 - 10.10.01 (3 jours) Programming TSX Premium 1: 15 - 19.10.01 (5 days) Programmation TSX Premium 1 : 22 - 26.10.01 (5 jours) Programming TSX Premium 2: 19 - 23.11.01 (5 days) Programmation TSX Premium 2 : 26 - 30.11.01 (5 jours) The following LabView courses will be given in either English or French according to demand LabVIEW - Base 1 / LabVIEW - Basics 1 : 10 - 12.9.01 (3 jours / 3 days) LabVIEW - DAQ / LabVIEW - DAQ : 13 - 14.9.01 (2 jours / 2 days) LabVIEW - Base 1 / LabVIEW - Basics 1 : 15 - 17.10.01 (3 jours / 3 days) LabVIEW - Base 2 / LabVIEW - Basics 2 : 18 - 19.10.01 (2 jours / 2 days) LabVIEW - Base 1 / LabVIEW - Basics 1 : 12 - 14.11.01 (3 jours / 3 days) LabVIEW - DAQ / LabVIEW - DAQ : 15 - 16.11.01 (2 jours / 2...

  3. PLACES AVAILABLE

    CERN Multimedia

    Monique Duval

    2002-01-01

    Places are available in the following courses: November 2002   LabView hands-on (bilingue/bilingual): 5.11.02 (matin/morning) LabView DAQ hands-on (bilingue/bilingual):  5.11.02  (après-midi afternoon) PCAD Schémas - Débutants :  5 & 6.11.02  (2 jours) PCAD PCB - Débutants :  9 - 11.11.02  (3 jours) Introduction au PC et Windows 2000 au CERN :  6 & 7.11.02  (2 jours) Oracle 8i : Access the Database with Java :  7 & 8.11.02  (2 days) Introduction to PVSS (free of charge):  11.11.2002 pm  (1/2 day) Basic PVSS:  12 - 14.11.02  (3 days) EXCEL 2000 - niveau 1 :  12 & 13.11.02  (2 jours) CLEAN-2002: Working in a Cleanroom (English, free of charge):  13.11.2002  (afternoon) LabView Base 1 :  13 - 15.11.02  (3 jours) AutoCAD 2002 - niveau 1 :  14, 15, 21, 22.11.02  (4 jours) LabVIEW - Advanced:  18 - 20.11.02  (3 days) Hands-on Object-Oriented Design and Programming with C++ :  19 - 21.11.02  (3 days)  LabVIEW - Basics 2:  21 - 22.11.02 ...

  4. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : FrontPage 2000 - niveau 1 : 20 & 21.5.03 (2 jours) PIPES-2003 : Pratique du sertissage de tubes métalliques et multicouches : 21.5.03 (1 jour) Introduction à la CAO Cadence : de la saisie de schéma Concept-HDL au PCB : 20 & 22.5.03 (2 jours) AutoCAD 2002 - niveau 2 : 3 & 4.6.03 (2 jours) AutoCAD Mechanical 6 PowerPack (F) : 5, 6, 12, 13, 26, 27.6.03 (6 jours) EXCEL 2000 - niveau 1 : 10 & 11.6.03 (2 jours) Conception de PCB rapides dans le flot Cadence : 11.6.03 (matin) EXCEL 2000 - level 1 : 12 & 13.6.03 (2 days) PowerPoint 2000 (F) : 17 & 18.6.03 (2 jours) Réalisation de PCB rapides dans le flot Cadence : 17.6.03 (matin) FrontPage 2000 - niveau 2 : 19 & 20.6.03 (2 jours) LabView DSC (langue à décider/language to be defined) : 19 & 20.6.03 EXCEL 2000 - niveau 2 : 24 & 25.6.03 (2 jours) Siemens SIMATIC Training: Introduction to STEP7 : 3 & 4.6.03 (2 days) STEP7 Programming : 16 - 20.6.03 (5 days) Simatic...

  5. PLACES AVAILABLE

    CERN Multimedia

    Technical Training; Tel. 74924

    2001-01-01

    Places are available in the following courses: PVSS Basics : 20 - 24.8.01 (5 days) PROFIBUS : 25 - 26.9.01 (2 jours) PROFIBUS : 27 - 28.9.01 (2 days) PCAD Schémas - débutants : 4 - 5.10.01 (2 jours) PCAD PCB - débutants : 8 - 10.10.01 (3 jours) Programming TSX Premium 1: 15 - 19.10.01 (5 days) Programmation TSX Premium 1 : 22 - 26.10.01 (5 jours) Programming TSX Premium 2: 19 - 23.11.01 (5 days) Programmation TSX Premium 2 : 26 - 30.11.01 (5 jours) The following LabView courses will be given in either English or French according to demand LabVIEW - Base 1 / LabVIEW - Basics 1 : 10 - 12.9.01 (3 jours / 3 days) LabVIEW - DAQ / LabVIEW - DAQ : 13 - 14.9.01 (2 jours / 2 days) LabVIEW - Base 1 / LabVIEW - Basics 1 : 15 - 17.10.01 (3 jours / 3 days) LabVIEW - Base 2 / LabVIEW - Basics 2 : 18 - 19.10.01 (2 jours / 2 days) LabVIEW - Base 1 / LabVIEW - Basics 1 : 12 - 14.11.01 (3 jours / 3 days) LabVIEW - DAQ / LabVIEW - DAQ : 15 - 16.11.01 (2 jours / 2...

  6. Places available **

    CERN Multimedia

    2003-01-01

    Des places sont disponibles dans les cours suivants : Places are available in the following courses : WorldFIP 2003 pour utilisateurs : 11-14.2.03 (4 jours) DISP-2003 ? Spring I Term : Introduction to Digital Signal Processing : 20, 27.2, 6, 13, 20, 27.3, 3.4.03 (7 X 2-hour lectures) AXEL-2003 - Introduction to Accelerators : 24-28.2.03 (10 X 1-hour lectures) AutoCAD 2002 - niveau 1 : 24, 25.2 & 3, 4.3.03 (4 jours) Introduction à Windows 2000 au CERN : 25.2.03 (1/2 journée) LabView base 2/LabView Basics 2 : 10 & 11.3.03 (2 jours/2 days) langue à définir/Language to be decided C++ for Particle Physicists : 10 ? 14.3.03 (6 X 3-hour lectures) Introduction to PVSS : 10.3.03 (half day, afternoon) Basic PVSS : 11 - 13.3.03 (3 days) LabView avancé /LabView Advanced : 12 - 14.3.03 (3 jours/3days) Langue à définir/language to be decided AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 17, 18, 24 & 25.3.03 (6 jours) PVSS - JCOP Framework Tutorial : 14.3.03 (1 day) MAGNE-03 - Magnetism for Technical Ele...

  7. Places available **

    CERN Multimedia

    2003-01-01

    Des places sont disponibles dans les cours suivants : Places are available in the following courses : Introduction à Windows 2000 au CERN : 25.2.03 (1/2 journée) LabView base 2/LabView Basics 2 : 10 & 11.3.03 (2 jours/2 days) langue à définir/Language to be decided C++ for Particle Physicists : 10 - 14.3.03 (6 X 3-hour lectures) Introduction to PVSS : 10.3.03 (half day, afternoon) Basic PVSS : 11 - 13.3.03 (3 days) LabView avancé /LabView Advanced : 12 - 14.3.03 (3 jours/3days) Langue à définir/Language to be decided AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 17, 18, 24 & 25.3.03 (6 jours) PVSS - JCOP Framework Tutorial : 14.3.03 (1 day) CLEAN-2002 : Working in a cleanroom : 2.4.03 (half-day, afternoon, free course, registration required) LabView base 1/LabView Basics 1 : 9 - 11.4.03 (3 jours/3 days) Langue à définir/Language to be decided DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures) AutoCAD 2002 - niveau 2 : 5 & 6.5.03 (...

  8. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : CLEAN-2002 : Working in a cleanroom (free course, registration required) : 2.4.03 (half-day, afternoon) LabView base 1/LabView Basics 1 (Langue à définir/ language to be decided) : 9 - 11.4.03 (3 jours/3 days) DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures) AutoCAD 2002 - niveau 1 : 29, 30.4 et 7, 8.5.03 (4 jours) AutoCAD 2002 - niveau 2 : 5 & 6.5.03 (2 jours) AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 20, 21, 27 & 28.5.03(6 jours) Formation Siemens SIMATIC /Siemens SIMATIC Training : Introduction à STEP7 /Introduction to STEP7 : 3 & 4.6.03 (2 jours/2 days) Programmation STEP7/STEP7 Programming : 31.3 - 4.4.03 / 16 - 20.6.03 (5 jours/5 days) Réseau Simatic Net /Simatic Net Network : 15 & 16.4.03 / 26 & 27.6.03 These courses will be given in French or English following the requests. Cours de sécurité : Etre TSO au CERN : 3 sessions sont programmées pour 2003 : 25...

  9. Places available **

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : CLEAN-2002 : Working in a cleanroom (free course, registration required): 11.4.03 (half-day, afternoon, ) LabView Basics 2 : 10 - 11.4.03 (3 days) DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures) AutoCAD 2002 - niveau 1 : 29, 30.4 et 7, 8.5.03 (4 jours) Oracle iDS Reports : Build Internet Reports : 5 - 9.5.03 (5 days) AutoCAD 2002 - niveau 2 : 5 & 6.5.03 (2 jours) AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 20, 21, 27 & 28.5.03 (6 jours) Formation Siemens SIMATIC /Siemens SIMATIC Training : Introduction à STEP7 /Introduction to STEP7 : 3 & 4.6.03 (2 jours/2 days) Programmation STEP7/STEP7 Programming : 31.3 - 4.4.03 / 16 - 20.6.03 (5 jours/5 days) Réseau Simatic Net /Simatic Net Network : 15 & 16.4.03 / 26 & 27.6.03 These courses will be given in French or English following the requests. Cours de sécurité : Etre TSO au CERN : Prochaines sessions : 24, 25 & 27.6....

  10. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : CLEAN-2002 : Working in a cleanroom (free course, registration required): 11.4.03 (half-day, afternoon, ) LabView Basics 2 : 10 - 11.4.03 (3 days) DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures) AutoCAD 2002 - niveau 1 : 29, 30.4 et 7, 8.5.03 (4 jours) Oracle iDS Reports : Build Internet Reports : 5 - 9.5.03 (5 days) AutoCAD 2002 - niveau 2 : 5 & 6.5.03 (2 jours) AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 20, 21, 27 & 28.5.03(6 jours) Formation Siemens SIMATIC /Siemens SIMATIC Training : Introduction à STEP7 /Introduction to STEP7 : 3 & 4.6.03 (2 jours/2 days) Programmation STEP7/STEP7 Programming : 31.3 - 4.4.03 / 16 - 20.6.03 (5 jours/5 days) Réseau Simatic Net /Simatic Net Network : 15 & 16.4.03 / 26 & 27.6.03 These courses will be given in French or English following the requests. Cours de sécurité : Etre TSO au CERN : Prochaines sessions : 24, 25 & 27.6...

  11. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures) Programmation de pilotes périphériques : 5 - 8.5.03 (4 jours) Oracle iDS Reports : Build Internet Reports : 5 - 9.5.03 (5 days) LabView DAQ (language to be defined) : 8 & 9.5.03 AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 20, 21, 27 & 28.5.0 (6 jours) FrontPage 2000 - niveau 1 : 20 & 21.5.03 (2 jours) AutoCAD 2002 - niveau 2 : 3 & 4.6.03 (2 jours) EXCEL 2000 - niveau 1 : 10 & 11.6.03 (2 jours) EXCEL 2000 - level 1 : 12 & 13.6.03 (2 days) PowerPoint 2000 (F) : 17 & 18.6.03 (2 jours) FrontPage 2000 - niveau 2 : 19 & 20.6.03 (2 jours) LabView DSC (langue à décider/language to be defined) : 19 & 20.6.03 EXCEL 2000 - niveau 2 : 24 & 25.6.03 (2 jours) Siemens SIMATIC Training : Introduction to STEP7 : 3 & 4.6.03 (2 days) STEP7 Programming : 16 - 20.6.03 (5 days) Simatic Net Network : 26 & 27.6.03 ...

  12. Places available **

    CERN Multimedia

    2003-01-01

    Des places sont disponibles dans les cours suivants : Places are available in the following courses : DISP-2003 - Spring I Term : Introduction to Digital Signal Processing : 20, 27.2, 6, 13, 20, 27.3, 3.4.03 (7 X 2-hour lectures) AXEL-2003 - Introduction to Accelerators : 24 - 28.2.03 (10 X 1-hour lectures) AutoCAD 2002 - niveau 1 : 24, 25.2 & 3, 4.3.03 (4 jours) Introduction à Windows 2000 au CERN : 25.2.03 (1/2 journée) LabView base 2/LabView Basics 2 : 10 & 11.3.03 (2 jours/2 days) langue à définir/Language to be decided C++ for Particle Physicists : 10 - 14.3.03 (6 X 3-hour lectures) Introduction to PVSS : 10.3.03 (half day, afternoon) Basic PVSS : 11 - 13.3.03 (3 days) LabView avancé /LabView Advanced : 12 - 14.3.03 (3 jours/3days) Langue à définir/language to be decided AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 17, 18, 24 & 25.3.03 (6 jours) PVSS - JCOP Framework Tutorial : 14.3.03 (1 day) CLEAN-2002 : Working in a cleanroom : 2.4.03 (half-day, afternoon, free course, regis...

  13. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : CLEAN-2002 : Working in a cleanroom (free course, registration required): 11.4.03 (half-day, afternoon) LabView Basics 2 : 10 - 11.4.03 (3 days) DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures) AutoCAD 2002 - niveau 1 : 29, 30.4 et 7, 8.5.03 (4 jours) Oracle iDS Reports : Build Internet Reports : 5 - 9.5.03 (5 days) AutoCAD 2002 - niveau 2 : 5 & 6.5.03 (2 jours) AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 20, 21, 27 & 28.5.03(6 jours) Formation Siemens SIMATIC /Siemens SIMATIC Training : Introduction à STEP7 /Introduction to STEP7 : 3 & 4.6.03 (2 jours/2 days) Programmation STEP7/STEP7 Programming : 16 - 20.6.03 (5 jours/5 days) Réseau Simatic Net /Simatic Net Network : 15 & 16.4.03 / 26 & 27.6.03 These courses will be given in French or English following the requests. Cours de sécurité : Etre TSO au CERN : Prochaines sessions : 24, 25 & 27.6.03 - 4, 5 & 7....

  14. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses : Introduction to PVSS : 10.3.03 (half-day, afternoon) CLEAN-2002 : Working in a cleanroom : 2.4.03 (half-day, afternoon, free course, registration required) LabView Basics 1 : 9 - 11.4.03 (3 days) Language to be decided. DISP-2003 - Spring II Term : Advanced Digital Signal Processing : 30.4, 7, 14, 21.5.03 (4 X 2-hour lectures). AutoCAD 2002 - niveau 1 : 29, 30.4 et 7, 8.5.03 (4 jours) AutoCAD 2002 - niveau 2 : 5 & 6.5.03 (2 jours) AutoCAD Mechanical 6 PowerPack (F) : 12, 13, 20, 21, 27 & 28.5.03 (6 jours) Siemens SIMATIC Training: Introduction to STEP7 : 3 & 4.6.03 (2 days) STEP7 Programming : 31.3 - 4.4.03 / 16 - 20.6.03 (5 days) Simatic Net Network : 15 & 16.4.03 / 26 & 27.6.03 These courses will be given in French or English following the requests. Cours de sécurité: Etre TSO au CERN : 3 sessions sont programmées pour 2003 : 25, 26 & 28.3.03 - 24, 25 & 27.6.03 - 4, 5 & 7.11.03 (sessions de 3 jours) ** The number o...

  15. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses: The CERN EDMS for Local Administrators : 24 & 25.9.03 (2 days, free of charge) HeREF-2003 : Techniques de la réfrigération Hélium cours en français avec support en anglais) : 6 - 10.10.2003 (7 demi-journées) The Java Programming Language Level 1 : 6 - 7.10.2003 (2 days) Java 2 Enterprise Edition - Part 2 : Enterprise JavaBeans : 8 - 10.10.2003 (3 days) FileMaker - niveau 1 : 9 & 10.10.03 (2 jours) EXCEL 2000 - niveau 1 : 20 & 22.10.03 (2 jours) AutoCAD 2002 - niveau 1 : 20, 21, 27, 28.10.03 (4 jours) CLEAN-2002 : Working in a Cleanroom : 23.10.03 (half day, free of charge) AutoCAD 2002 - Level 1 : 3, 4, 12, 13.11.03 (4 days) AutoCAD 2002 - niveau 2 : 10 & 11.11.03 (2 jours) ACCESS 2000 - niveau 1 : 13 & 14.11.03 (2 jours) AutoCAD Mechanical 6 PowerPack (E) : 17, 18, 24, 25.11 & 1, 2.12.03 (6 days) FrontPage 2000 - niveau 1 : 20 & 21.11.03 (2 jours) MAGNE-03 : Magnétisme pour l'électrotechnique : 25 - 27.11.03 (3 jours) ...

  16. Places available**

    CERN Multimedia

    2003-01-01

    Places are available in the following courses: PIPES-2003 - Pratique du sertissage de tubes métalliques et multicouches :26.8.03(stage pratique) The CERN EDMS for Engineers (free of charge) : 27.8.03 (1 day) CLEAN-2002 : Travailler en salle blanche (séminaire gratuit) : 4.9.03(une demi-journée) The CERN EDMS for Local Administrators (free of charge) : 24 & 25.9.03 (2 days) HeREF-2003 : Techniques de la réfrigération Hélium (cours en français avec support en anglais) : 6 - 10.10.2003 (7 demi-journées) The Java Programming Language Level 1 : 6 - 7.10.2003 (2 days) Java 2 Enterprise Edition - Part 2 : Enterprise JavaBeans : 8 - 10.10.2003 (3 days) FileMaker - niveau 1 : 9 & 10.10.03 (2 jours) EXCEL 2000 - niveau 1 : 20 & 22.10.03 (2 jours) AutoCAD 2002 - niveau 1 : 20, 21, 27, 28.10.03 (4 jours) CLEAN-2002 : Working in a Cleanroom (free of charge) : 23.10.03 (half day) AutoCAD Mechanical 6 PowerPack (E) : 23, 24, 30, 31.10 & 12, 13.11.03 (6 days) AutoCAD 2002 - niveau 2...

  17. Places available**

    CERN Document Server

    2003-01-01

    Places are available in the following courses : FrontPage 2000 - niveau 1: 20 & 21.5.03 (2 jours) PIPES-2003 : Pratique du sertissage de tubes métalliques et multicouches: 21.5.03 (1 jour) Introduction à la CAO Cadence: de la saisie de schéma Concept-HDL au PCB : 20 & 22.5.03 (2 jours) AutoCAD Mechanical 6 PowerPack (E): 5, 6, 12, 13, 26, 27.6.03 (6 days) EXCEL 2000 - niveau 1: 10 & 11.6.03 (2 jours) Conception de PCB rapides dans le flot Cadence: 11.6.03 (matin) EXCEL 2000 - level 1: 12 & 13.6.03 (2 days) Introduction to PVSS: 16.6.03 (half-day, pm) Basic PVSS: 17 - 19.6.03 (3 days) Réalisation de PCB rapides dans le flot Cadence: 17.6.03 (matin) LabView DSC (language to be defined): 19 & 20.6.03 PVSS - JCOP Framework Tutorial: 20.6.03 (1 day) EXCEL 2000 - niveau 2: 24 & 25.6.03 (2 jours) Siemens SIMATIC Training: Introduction to STEP7: 3 & 4.6.03 (2 days) STEP7 Programming: 16 - 20.6.03 (5 days) Simatic Net Network: 26 & 27.6.03 (2 days) These courses will be given...

  18. Oil coastal tanker maintenance and availability

    Energy Technology Data Exchange (ETDEWEB)

    Goldsztejn, Eduardo; Gomez Haedo, Juan Carlos [Government' s Oil Company of Uruguay (ANCAP), Montivideo (Uruguay)

    2008-07-01

    ANCAP (Government's Oil Company of Uruguay) owns a 4000 DWT oil coastal tanker which is mainly used for oil transport in the River Plate, Uruguay and Parana rivers. Availability of the ship is critical because of shortage of available vessels in the region. Full maximum draught of the vessel is 4m , so it can navigate in very shallow waters as it is the case of some places in the Uruguay and Parana rivers. Although the ship was built in 1979, it is a complete double hull, powered by two twin main engines and propellers. Since 1994, several changes in maintenance management have been introduced, in order to increase the availability, thus increasing the total oil volume yearly transported. These changes affected several maintenance items and they also included a modification in the design of part of the cargo tank floors of the ship. As a result of these changes, an increase of 60% of the oil derivatives volume transported yearly was achieved. In this paper, some of the important improvements on maintenance practises and management are described, together with a quantification of their influence on vessel's availability and overall maintenance costs. (author)

  19. Role of Facilities Available and Un-Available in Attracting of Tourist in Swat Valley Pakistan

    Directory of Open Access Journals (Sweden)

    Akbar Jalaluddin

    2017-01-01

    Full Text Available Natural landscape is an important resource for mountainous regions and play crucial role in tourism development. Tourism play a key role in economic development of a country. Developing tourist areas is the key to meet the expectations of mountain inhabitants, tourists, and the general public outside of mountainous areas. In order to know tourist perception, problems, and role of landscape & horticulture plants in the field of tourism. A research study entitled “Role of facilities available and un-available in attracting of tourist in swat valley Pakistan “The data was collected from the respondents through a questionnaire survey and analyzed using percentages, frequencies and Chi-square test (where applicable. The analyzed data revealed that most of the respondent (55 % considered natural green environment as a reason for their visit and 67 % respondents wanted to visit with their friends and were satisfied with the tourist area, respectively. Most of the respondent (39 % observed throwing of surplus food as major waste materials which turned the beautiful green environment into unattractive environment. Most of the visitors (52 % dislike un-cleanliness of the locality, 74% respondents felt ill effect due to deforestation.53 % tourist disagree with the current maintenance of the locality by tourism department. The most missed facilities were non availability of dustbins and children playing areas. 75 % respondents agreed with the fact that most of the people (local inhabitants as well as tourist were unaware with regard to maintenance activities of the area 15.7 % respondent agreed that road system should be improved to access most of the greenery in the locality, respectively to aware local people and tourist regarding maintenance of the locality will improve tourism in Swat valley. The studies need to be develop for the improvement of existing as well as artificial landscape of the tourist area (Kalam and Malamjabba of Swat valley.

  20. Availability of thermal power plants

    International Nuclear Information System (INIS)

    Nitsch, D.; Schmitz, H.

    1981-01-01

    Availability data based on unique uniform, and clearly defined concepts and methods of acquisition have been compiled by the VGB since 1970. The data are published in anual reports. These reports contain availability data of fossil-fuelled units, combined gas/steam units, nuclear power plants, and gas turbine plants in Germany and abroad, listed by unit size fuel type, time of operation, and application. For the purpose of comparison, the data for the years since 1970 are presented as well as data averaged for the whole period under report. The main results for the year 1980 are presented now that the greater part of the plants has been evaluated. The complete evaluation will be published towards the end of 1981. (orig.) [de

  1. Nitrogen availability of biogas residues

    Energy Technology Data Exchange (ETDEWEB)

    El-Sayed Fouda, Sara

    2011-09-07

    The objectives of this study were to characterize biogas residues either unseparated or separated into a liquid and a solid phase from the fermentation of different substrates with respect to their N and C content. In addition, short and long term effects of the application of these biogas residues on the N availability and N utilization by ryegrass was investigated. It is concluded that unseparated or liquid separated biogas residues provide N at least corresponding to their ammonium content and that after the first fertilizer application the C{sub org}:N{sub org} ratio of the biogas residues was a crucial factor for the N availability. After long term application, the organic N accumulated in the soil leads to an increased release of N.

  2. Availabilities in the June Safety Training sessions

    CERN Multimedia

    2010-01-01

    A few places are still available on the safety courses mentioned below. Please consult the Safety training catalogue to obtain all the latest information and to register. Clearance for work with electrical equipment ("Habilitation électrique") for non-electricians (classroom-based course), 9 June, in French, 8 hours from 9.00 am to 5.30 pm (10 places available) Safety in Cryogenics level 1, 14 June, in English, 3 hours from, 9.00 am to 12 noon (5 places available) Lift-truck operation ("Conduite de chariots élévateurs"), 24-25 June, in French, 2 days from 8.00 am to 5.30 pm (3 places available).

  3. Availability of thermal power plants 1976-1985

    International Nuclear Information System (INIS)

    Nitsch, D.; Schmitz, H.

    1986-01-01

    This assessment is the 15th annual assessment since 1970. It covers the decade 1976 to 1985 and contains the availability figures for 395 power stations in Germany and abroad with an output of about 93,750 MW and 3,642 years of power station operation. The availability figures of fossil fired units, combined units (plant with combined gas/steam circuit), nuclear power stations and gas turbine plants are given, which are classified according to unit size, fuel, type of construction, age and method of use. The German plants are covered separately. All output figures are gross figures (output at the generator terminals). For comparison purposes, apart for the results of 1985, the annual values determined since 1976 and the mean values for the decade 1976-1985 are given. The non-availability is divided into faults and planned outages since 1978. Availability figures for the years 1970 to 1975 can be found in the VGB assessment 'Availability of thermal power plants 1970-1981'. (orig./GL) [de

  4. High Available COTS Based Computer for Space

    Science.gov (United States)

    Hartmann, J.; Magistrati, Giorgio

    2015-09-01

    The availability and reliability factors of a system are central requirements of a target application. From a simple fuel injection system used in cars up to a flight control system of an autonomous navigating spacecraft, each application defines its specific availability factor under the target application boundary conditions. Increasing quality requirements on data processing systems used in space flight applications calling for new architectures to fulfill the availability, reliability as well as the increase of the required data processing power. Contrary to the increased quality request simplification and use of COTS components to decrease costs while keeping the interface compatibility to currently used system standards are clear customer needs. Data processing system design is mostly dominated by strict fulfillment of the customer requirements and reuse of available computer systems were not always possible caused by obsolescence of EEE-Parts, insufficient IO capabilities or the fact that available data processing systems did not provide the required scalability and performance.

  5. Fusion power plant availability study

    International Nuclear Information System (INIS)

    Ladra, D.; Sanguinetti, G.P.; Stube, E.

    2001-01-01

    The consideration of fusion as an alternative energy source will need to demonstrate that Fusion Power Plant (FPP) design, operating and maintenance characteristics meet the electrical market requirements forecast for the second half of this century. Until now, fusion has been developed in the framework of research and development programmes following natural technological trends. To bring a greater sense of realism to commercial viability and to guarantee that technology-driven fusion development responds to the demands of the market, a conceptual study of future commercial FPPs has been performed with a Power Plant Availability (PPA) study aimed at identifying the aspects affecting the availability and generating costs of FPPs. EFET, who has also been involved in the study, can visualise it from two different points of view; that of the industry (ANSALDO, IBERTEF, SIEMENS, NNC) and that of the utilities (BELGATOM, FRAMATOME, FORTUM). The work carried out covered the following points: socio-economic forecasting; safety and licensing; operation and maintenance; waste and decommissioning; availability and reliability. The following are the most relevant findings, conclusions and recommendations for all these aspects: Demonstrate definitively that the physical principles of nuclear fusion have been validated by means of experiments; Establish a European Industrial Group to support the demonstration phases; Create the financial and contracting framework required to construct these installations. Secure the necessary budgets for the European Union's 5th and 6th Research Programmes. Look for supplementary long term financing sources; The existing Regulatory Bodies should combine to form a single Working Group with responsibility for fusion reactor safety and licensing activities, working on the harmonisation of the regulatory processes, developing FPP safety criteria and guidelines and reviewing industry standards; To be competitive, FPPs should have high availability

  6. Radon availability in New Mexico

    International Nuclear Information System (INIS)

    McLemore, V.T.

    1995-01-01

    The New Mexico Bureau of Mines and Mineral Resources (NMBMMR) in cooperation with the Radiation Licensing and Registration Section of the New Mexico Environment Department (NMED) and the US Environmental Protection Agency (EPA) have been evaluating geologic and soil conditions that may contribute to elevated levels of indoor radon throughout New Mexico. Various data have been integrated and interpreted in order to determine areas of high radon availability. The purpose of this paper is to summarize some of these data for New Mexico and to discuss geologic controls on the distribution of radon. Areas in New Mexico have been identified from these data as having a high radon availability. It is not the intent of this report to alarm the public, but to provide data on the distribution of radon throughout New Mexico

  7. Advancing drug availability-experiences from Africa.

    Science.gov (United States)

    Powell, Richard A; Kaye, Richard Mugula; Ddungu, Henry; Mwangi-Powell, Faith

    2010-07-01

    International health and drug regulatory authorities acknowledge that analgesics (especially opioids) are insufficiently available for pain management in many countries. In Africa, reported morphine consumption is far below the global mean, with multiple factors hampering opioid supply. Since 2006, the African Palliative Care Association has hosted three regional drug availability workshops across the continent to address this issue. Using an interactive format, the workshops have identified country-specific barriers to opioid and other essential medication accessibility before supporting participants to develop action plans to address recognized impediments. Despite multiple challenges, a number of successes have arisen from the implementation of the plans. However, key issues remain, including the introduction of supportive policy environments, effective educational initiatives, and measures to address supply-chain obstacles impeding drug availability. Copyright 2010 U.S. Cancer Pain Relief Committee. Published by Elsevier Inc. All rights reserved.

  8. Water Availability in a Warming World

    Science.gov (United States)

    Aminzade, Jennifer

    As climate warms during the 21st century, the resultant changes in water availability are a vital issue for society, perhaps even more important than the magnitude of warming itself. Yet our climate models disagree in their forecasts of water availability, limiting our ability to plan accordingly. This thesis investigates future water availability projections from Coupled Ocean-Atmosphere General Circulation Models (GCMs), primarily using two water availability measures: soil moisture and the Supply Demand Drought Index (SDDI). Chapter One introduces methods of measuring water availability and explores some of the fundamental differences between soil moisture, SDDI and the Palmer Drought Severity Index (PDSI). SDDI and PDSI tend to predict more severe future drought conditions than soil moisture; 21st century projections of SDDI show conditions rivaling North American historic mega-droughts. We compare multiple potential evapotranspiration (EP) methods in New York using input from the GISS Model ER GCM and local station data from Rochester, NY, and find that they compare favorably with local pan evaporation measurements. We calculate SDDI and PDSI values using various EP methods, and show that changes in future projections are largest when using EP methods most sensitive to global warming, not necessarily methods producing EP values with the largest magnitudes. Chapter Two explores the characteristics and biases of the five GCMs and their 20th and 21st century climate projections. We compare atmospheric variables that drive water availability changes globally, zonally, and geographically among models. All models show increases in both dry and wet extremes for SDDI and soil moisture, but increases are largest for extreme drying conditions using SDDI. The percentage of gridboxes that agree on the sign of change of soil moisture and SDDI between models is very low, but does increase in the 21st century. Still, differences between models are smaller than differences

  9. Design and reliability, availability, maintainability, and safety analysis of a high availability quadruple vital computer system

    Institute of Scientific and Technical Information of China (English)

    Ping TAN; Wei-ting HE; Jia LIN; Hong-ming ZHAO; Jian CHU

    2011-01-01

    With the development of high-speed railways in China,more than 2000 high-speed trains will be put into use.Safety and efficiency of railway transportation is increasingly important.We have designed a high availability quadruple vital computer (HAQVC) system based on the analysis of the architecture of the traditional double 2-out-of-2 system and 2-out-of-3 system.The HAQVC system is a system with high availability and safety,with prominent characteristics such as fire-new internal architecture,high efficiency,reliable data interaction mechanism,and operation state change mechanism.The hardware of the vital CPU is based on ARM7 with the real-time embedded safe operation system (ES-OS).The Markov modeling method is designed to evaluate the reliability,availability,maintainability,and safety (RAMS) of the system.In this paper,we demonstrate that the HAQVC system is more reliable than the all voting triple modular redundancy (AVTMR) system and double 2-out-of-2 system.Thus,the design can be used for a specific application system,such as an airplane or high-speed railway system.

  10. Estimating the availability of LLEA officers

    International Nuclear Information System (INIS)

    Berkbigler, K.P.

    1977-07-01

    An important element in the analysis of transportation safeguards systems is the determination of the availability of local law enforcement agents. Such information is necessary to identify areas where there are few officers available and to make comparisons of alternative routes. A computerized model, COPS, has been developed which rapidly estimates the total number of officers along a highway route. This paper briefly describes the model and presents example results for several routes in California and Nevada

  11. Measuring on-shelf availability of FMCG products

    Directory of Open Access Journals (Sweden)

    Grubor Aleksandar

    2015-01-01

    Full Text Available Technological development and the process of globalization influence the increase of customers' awareness. In these circumstances they are becoming more demanding, expecting retailers to offer them the right product at the right time and at the right place. The result is one of the basic tasks of retailers, which reflects in providing an adequate level of product availability in retail stores. In order to prevent the stock-out situation, special attention should be dedicated to its identification and measurement. These operations are very important for establishing and implementing other various measures for increasing product availability and thus sales and competitiveness of retail companies. In this regard, besides theoretical considerations of product availability, we presented the basic methods for its measurement. Also, by using the sample of six Fast Moving Consumer goods categories, we applied the method based on the analysis of POS data. In addition to identifying the out-of-stock rates, we confirmed the results of other studies that product availability varies among different categories and retail stores.

  12. Availability of thermal power plants 1977-1986

    International Nuclear Information System (INIS)

    Nitsch, D.; Schmitz, H.

    1987-01-01

    To get a picture of power plant availability and its influencing factors, availability data have been acquired and evaluated by VGB according to different design and operation parameters since 1970. The present volume is the 16th annual statistics since 1970. It covers the decade of 1977 to 1986 and contains availability data of 384 power plants in Germany and abroad, with a total of 94.896 MW and 3.768 plant years. Data are presented on fossil-fuelled units, units with a combined gas/steam cycle, nuclear power plants and gas turbine systems, with further sub-categories according to unit size, fuel, type, years of operation, and operating regime. German plants are reviewed separately. All power data are gross data measured at the generator terminals. For a comparative evaluation, the data of 1986 are supplemented by yearly averages since 1977 and averages for the decade from 1977 to 1986. Since 1978, nonavailability data are categorized as 'unscheduled' and 'scheduled' nonavailabilities. For availability data of 1970 to 1976, see the VGB publication 'Availability of thermal power plants, 1970 to 1981'. (orig./UA) [de

  13. Modelling maximum likelihood estimation of availability

    International Nuclear Information System (INIS)

    Waller, R.A.; Tietjen, G.L.; Rock, G.W.

    1975-01-01

    Suppose the performance of a nuclear powered electrical generating power plant is continuously monitored to record the sequence of failure and repairs during sustained operation. The purpose of this study is to assess one method of estimating the performance of the power plant when the measure of performance is availability. That is, we determine the probability that the plant is operational at time t. To study the availability of a power plant, we first assume statistical models for the variables, X and Y, which denote the time-to-failure and the time-to-repair variables, respectively. Once those statistical models are specified, the availability, A(t), can be expressed as a function of some or all of their parameters. Usually those parameters are unknown in practice and so A(t) is unknown. This paper discusses the maximum likelihood estimator of A(t) when the time-to-failure model for X is an exponential density with parameter, lambda, and the time-to-repair model for Y is an exponential density with parameter, theta. Under the assumption of exponential models for X and Y, it follows that the instantaneous availability at time t is A(t)=lambda/(lambda+theta)+theta/(lambda+theta)exp[-[(1/lambda)+(1/theta)]t] with t>0. Also, the steady-state availability is A(infinity)=lambda/(lambda+theta). We use the observations from n failure-repair cycles of the power plant, say X 1 , X 2 , ..., Xsub(n), Y 1 , Y 2 , ..., Ysub(n) to present the maximum likelihood estimators of A(t) and A(infinity). The exact sampling distributions for those estimators and some statistical properties are discussed before a simulation model is used to determine 95% simulation intervals for A(t). The methodology is applied to two examples which approximate the operating history of two nuclear power plants. (author)

  14. Availability by Design

    DEFF Research Database (Denmark)

    Vigo, Roberto

    . There exist various practical techniques to face DoS attacks and mitigate their effects, yet we witness the successfulness of many. The need for a renewed investigation of availability gains in relevance when considering that our life is more and more dominated by Cyber-Physical Systems (CPSs), large......In computer security, a Denial-of-Service (DoS) attack aims at making a resource unavailable. DoS attacks to systems of public concern occur increasingly and have become infamous on the Internet, where they have targeted major corporations and institutions, thus reaching the general public......-scale network of sensors that interact with the physical environment. CPSs are increasingly exploited in the realisation of critical infrastructure, from the power grid to healthcare, traffic control, and defence applications. Such systems are particularly prone to DoS attacks: in addition to classic...

  15. 47 CFR 1.403 - Notice and availability.

    Science.gov (United States)

    2010-10-01

    ... and Related Pleadings § 1.403 Notice and availability. All petitions for rule making (other than..., nature of the proposal, and date of filing, Petitions for rule making are available at the Commission's...

  16. Non disponible / Not available

    OpenAIRE

    Claire , Michel

    2015-01-01

    Non disponible / Not available; Introduction : Les capacités de reconnaissance des expressions faciales s’altèrent avec l’âge et dans certaines pathologies telles que la maladie d’Alzheimer mais aussi, entre autres, dans d’autres démences, maladies neurologiques ou psychiatriques. Les soignants peuvent-ils être assimilés à la population générale en ce qui concerne la reconnaissance des expressions faciales ? Les patients atteints de maladie d’Alzheimer sont-ils capables d’exprimer des émotion...

  17. Availability statistics for thermal power plants

    International Nuclear Information System (INIS)

    1989-01-01

    Denmark, Finland and Sweden have adopted almost the same methods of recording and calculation of availability data. For a number of years comparable availability and outage data for thermal power have been summarized and published in one report. The purpose of the report now presented for 1989 containing general statistical data is to produce basic information on existing kinds of thermal power in the countries concerned. With this information as a basis additional and more detailed information can be exchanged in direct contacts between bodies in the above mentioned countries according to forms established for that purpose. The report includes fossil steam power, nuclear power and gas turbines. The information is presented in separate diagrams for each country, but for plants burning fossil fuel also in a joint NORDEL statistics with data grouped according to type of fuel used. The grouping of units into classes of capacity has been made in accordance with the classification adopted by UNIPEDE/WEC. Values based on energy have been adopted as basic availability data. The same applies to the preference made in the definitions outlined by UNIPEDE and UNIPEDE/WEC. Some data based on time have been included to make possible comparisons with certain international values and for further illustration of the performance. For values given in the report, the definitions in the NORDEL document ''Concepts of Availability for Thermal Power, September 1977'', have been applied. (author)

  18. 48 CFR 2907.300 - Availability of inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Availability of inventory... PLANNING ACQUISITION PLANNING Contractor Versus Government Performance 2907.300 Availability of inventory. The Department of Labor's FAIR Act inventory of commercial activities performed by federal employees...

  19. 75 FR 8988 - Environmental Impact Statements; Availability

    Science.gov (United States)

    2010-02-26

    ... DEPARTMENT OF THE INTERIOR Environmental Impact Statements; Availability AGENCY: National Park Service. ACTION: Notice of availability for the Record of Decision on the Final Environmental Impact...) for the final Environmental Impact Statement (EIS) for the disposition of the Bureau of Mines property...

  20. Non disponible / Not available

    OpenAIRE

    Maud , Conti

    2010-01-01

    Non disponible / Not available; La stratification des résines composites sur dents antérieures est la méthode directe qui devrait être systématiquement employée pour reconstituer la région antérieure.En effet, cette technique permet d'obtenir d'excellents résultats durables et esthétiques. Cependant, elle requiert un certain apprentissage puisqu'il s'agit d'apposer des couches successives de résine composite dans le bon ordre et dans de bonnes proportions, en suivant un protocole bien précis....

  1. Non disponible / Not available

    OpenAIRE

    Sonia , Assili

    2014-01-01

    Non disponible / Not available; Dans de nombreux pays développés, les patients cherchent des alternatives auxsoins dentaires devenus difficiles d’accès pour de multiples raisons. Parallèlement, lamondialisation n’épargne aucun secteur, si bien que nous assistons à la commercialisation dela santé. Le patient tend à devenir un consommateur de soins et le praticien un délivreur desoins. L’offre de soins à l’étranger et aujourd’hui dans des centres dentaires dits « low-cost »apparaissent comme un...

  2. Non disponible / Not available

    OpenAIRE

    Marc , Thomas

    2011-01-01

    Non disponible / Not available; Les inspecteurs de santé publique travaillent désormais au sein de l'ARS.Ils veillent au respect et à l'application du code de la santé publique et mènent des inspections dans les pharmacies d'officine notamment pour contrôler le travail du pharmacien concernant les médicaments thermo-sensibles.Le respect de la chaîne du froid est un enjeu quotidien pour le pharmacien.Quels sont les recommandations à suivre et sur quels critères doit-il se baser pour respecter ...

  3. Non disponible / Not available

    OpenAIRE

    Romuald , Bour

    2013-01-01

    Non disponible / Not available; La prise en charge d'une personne institutionnalisée atteinte de démence est souvent marquée par l'apparition de troubles du comportement perturbateurs pour la vie des autres résidents et la réalisation des soins. Ces situations peuvent amener les Médecins Traitants, en synergie avec le personnel soignant, à recourir aux Consultations Mémoire en vue d'une réévaluation clinique, d'une adaptation thérapeutique ou de la mise en place de traitements non pharmacolog...

  4. Non disponible / Not available

    OpenAIRE

    Fabrice , Lavigne

    2002-01-01

    Non disponible / Not available; Nous rapportons les résultats d'une enquête prospective de 6 mois concernant 441 patients ayant présenté une douleur abdominale aiguë. Cette étude a pour objectif d 'étudier lors d'affection abdominale aiguë, d'autres paramètres hématologiques que la classique hyperleucocytose avec polynucleose neutrophile.Plus la lymphopénie est profonde, plus l'affection est potentiellement sévère; cependant sa sensibilité est faible. Une lymphopénie profonde est un pronostic...

  5. Availability estimation of international nuclear power plants

    International Nuclear Information System (INIS)

    Ribeiro, A.A.T.; Muniz, A.A.

    1978-11-01

    Results are presented of investigation on the factors influencing the availability of nuclear power plants of the PWR type; an estimation of expected values for the availability factor and the probability of its having lower values than a certain specified value are given. (Author) [pt

  6. Towards Optimal IT Availability Planning: Methods and Tools

    NARCIS (Netherlands)

    Zambon, Emmanuele

    2011-01-01

    The availability of an organisation’s IT infrastructure is of vital importance for supporting business activities. IT outages are a cause of competitive liability, chipping away at a company financial performance and reputation. To achieve the maximum possible IT availability within the available

  7. Neighborhood fast food availability and fast food consumption.

    Science.gov (United States)

    Oexle, Nathalie; Barnes, Timothy L; Blake, Christine E; Bell, Bethany A; Liese, Angela D

    2015-09-01

    Recent nutritional and public health research has focused on how the availability of various types of food in a person's immediate area or neighborhood influences his or her food choices and eating habits. It has been theorized that people living in areas with a wealth of unhealthy fast-food options may show higher levels of fast-food consumption, a factor that often coincides with being overweight or obese. However, measuring food availability in a particular area is difficult to achieve consistently: there may be differences in the strict physical locations of food options as compared to how individuals perceive their personal food availability, and various studies may use either one or both of these measures. The aim of this study was to evaluate the association between weekly fast-food consumption and both a person's perceived availability of fast-food and an objective measure of fast-food presence - Geographic Information Systems (GIS) - within that person's neighborhood. A randomly selected population-based sample of eight counties in South Carolina was used to conduct a cross-sectional telephone survey assessing self-report fast-food consumption and perceived availability of fast food. GIS was used to determine the actual number of fast-food outlets within each participant's neighborhood. Using multinomial logistic regression analyses, we found that neither perceived availability nor GIS-based presence of fast-food was significantly associated with weekly fast-food consumption. Our findings indicate that availability might not be the dominant factor influencing fast-food consumption. We recommend using subjective availability measures and considering individual characteristics that could influence both perceived availability of fast food and its impact on fast-food consumption. If replicated, our findings suggest that interventions aimed at reducing fast-food consumption by limiting neighborhood fast-food availability might not be completely effective

  8. 22 CFR 128.17 - Availability of orders.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Availability of orders. 128.17 Section 128.17 Foreign Relations DEPARTMENT OF STATE INTERNATIONAL TRAFFIC IN ARMS REGULATIONS ADMINISTRATIVE PROCEDURES..., probationary periods, and interim suspension orders are available for public inspection in the Public Reading...

  9. 22 CFR 401.11 - Availability of records.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Availability of records. 401.11 Section 401.11 Foreign Relations INTERNATIONAL JOINT COMMISSION, UNITED STATES AND CANADA RULES OF PROCEDURE General... shall be available for public information at the permanent offices of the Commission. Applications...

  10. 15 CFR 768.3 - Foreign availability assessment.

    Science.gov (United States)

    2010-01-01

    ... availability assessment. A foreign availability assessment is an evidentiary analysis that BIS conducts to... if there is no foreign policy reason to deny the license, unless the President exercises a National... foreign policy controls may be considered independent of this part. (b) Types of assessments. There are...

  11. Price, availability and affordability of medicines

    Directory of Open Access Journals (Sweden)

    Brenda S. Mhlanga

    2014-01-01

    Full Text Available Background: Medicines play an important role in healthcare, but prices can be a barrier to patient care. Few studies have looked at the prices of essential medicines in low- and middle-income countries in terms of patient affordability.Aim: To determine the prices, availability and affordability of medicines along the supply chain in Swaziland.Setting: Private- and public-sector facilities in Manzini, Swaziland.Methods: The standardised methodology designed by the World Health Organization and Health Action International was used to survey 16 chronic disease medicines. Data were collected in one administrative area in 10 private retail pharmacies and 10 public health facilities. Originator brand (OB and lowest-priced generic equivalent (LPG medicines were monitored and these prices were then compared with international reference prices (IRPs. Affordability was calculated in terms of the daily wage of the lowest-paid unskilled government worker.Results: Mean availability was 68% in the public sector. Private sector OB medicines were priced 32.4 times higher than IRPs, whilst LPGs were 7.32 times higher. OBs cost473% more than LPGs. The total cumulative mark-ups for individual medicines range from 190.99% – 440.27%. The largest contributor to add-on cost was the retail mark-up (31% – 53%. Standard treatment with originator brands cost more than a day’s wage.Conclusion: Various policy measures such as introducing price capping at all levels of the medicine supply chain, may increase the availability, whilst at the same time reducing the prices of essential medicines for the low income population.

  12. Price, availability and affordability of medicines

    Directory of Open Access Journals (Sweden)

    Brenda S. Mhlanga

    2014-06-01

    Full Text Available Background: Medicines play an important role in healthcare, but prices can be a barrier to patient care. Few studies have looked at the prices of essential medicines in low- and middle-income countries in terms of patient affordability. Aim: To determine the prices, availability and affordability of medicines along the supply chain in Swaziland. Setting: Private- and public-sector facilities in Manzini, Swaziland. Methods: The standardised methodology designed by the World Health Organization and Health Action International was used to survey 16 chronic disease medicines. Data were collected in one administrative area in 10 private retail pharmacies and 10 public health facilities. Originator brand (OB and lowest-priced generic equivalent (LPG medicines were monitored and these prices were then compared with international reference prices (IRPs. Affordability was calculated in terms of the daily wage of the lowest-paid unskilled government worker. Results: Mean availability was 68% in the public sector. Private sector OB medicines were priced 32.4 times higher than IRPs, whilst LPGs were 7.32 times higher. OBs cost473% more than LPGs. The total cumulative mark-ups for individual medicines range from 190.99% – 440.27%. The largest contributor to add-on cost was the retail mark-up (31% – 53%. Standard treatment with originator brands cost more than a day’s wage. Conclusion: Various policy measures such as introducing price capping at all levels of the medicine supply chain, may increase the availability, whilst at the same time reducing the prices of essential medicines for the low income population.

  13. How valid are commercially available medical simulators?

    Directory of Open Access Journals (Sweden)

    Stunt JJ

    2014-10-01

    Full Text Available JJ Stunt,1 PH Wulms,2 GM Kerkhoffs,1 J Dankelman,2 CN van Dijk,1 GJM Tuijthof1,2 1Orthopedic Research Center Amsterdam, Department of Orthopedic Surgery, Academic Medical Centre, Amsterdam, the Netherlands; 2Department of Biomechanical Engineering, Faculty of Mechanical, Materials and Maritime Engineering, Delft University of Technology, Delft, the Netherlands Background: Since simulators offer important advantages, they are increasingly used in medical education and medical skills training that require physical actions. A wide variety of simulators have become commercially available. It is of high importance that evidence is provided that training on these simulators can actually improve clinical performance on live patients. Therefore, the aim of this review is to determine the availability of different types of simulators and the evidence of their validation, to offer insight regarding which simulators are suitable to use in the clinical setting as a training modality. Summary: Four hundred and thirty-three commercially available simulators were found, from which 405 (94% were physical models. One hundred and thirty validation studies evaluated 35 (8% commercially available medical simulators for levels of validity ranging from face to predictive validity. Solely simulators that are used for surgical skills training were validated for the highest validity level (predictive validity. Twenty-four (37% simulators that give objective feedback had been validated. Studies that tested more powerful levels of validity (concurrent and predictive validity were methodologically stronger than studies that tested more elementary levels of validity (face, content, and construct validity. Conclusion: Ninety-three point five percent of the commercially available simulators are not known to be tested for validity. Although the importance of (a high level of validation depends on the difficulty level of skills training and possible consequences when skills are

  14. Broadband availability in metropolitan and non-metropolitan Pennsylvania

    Directory of Open Access Journals (Sweden)

    Lawrence E. Wood

    2016-09-01

    Full Text Available Over the past few years having a broadband connection has become essential for many Internet activities. As broadband increases in importance, it becomes imperative to assess how its use and availability may vary, especially in relation to issues such as geographic location. For rural areas in particular, the availability of broadband service is especially important. This research assesses broadband service availability in rural areas of Pennsylvania, USA. In particular, it examines the extent to which Digital Subscriber Line (DSL and broadband cable modem services are being deployed throughout rural Pennsylvania. It compares this deployment with the availability of such services in the state’s urban and metropolitan areas. The results of this research suggest that there is a “digital divide” in terms of broadband availability between rural and urban areas of Pennsylvania. However, this “divide” is perhaps not as wide as might be expected. Thus, as broadband is becoming increasingly available in rural areas of the U.S. and throughout much of the rest of the world, this research concludes that while research must remain vigilant in terms of assessing advanced telecommunications availability in rural areas, future research should also be sure to focus on how such technologies can be used to promote economic and social concerns, including in relation to building online networks and diminishing social and professional isolation in rural areas.

  15. 41 CFR 101-39.201 - Services available.

    Science.gov (United States)

    2010-07-01

    ...-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.2-GSA Interagency Fleet Management System Services § 101-39.201 Services available. GSA Interagency Fleet Management System (IFMS) vehicles and services shall be used in... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Services available. 101...

  16. 15 CFR 971.423 - Best available technology.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Best available technology. 971.423... technology. The Administrator will require in all activities under new permits, and wherever practicable in activities under existing permits, the use of the best available technologies for the protection of safety...

  17. 7 CFR 160.73 - Availability of standards.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Availability of standards. 160.73 Section 160.73 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... STANDARDS FOR NAVAL STORES Loan and Care of United States Standards § 160.73 Availability of standards. (a...

  18. Microsoft Exchange Server 2013 high availability

    CERN Document Server

    Mota, Nuno

    2014-01-01

    This book is a hands-on practical guide that provides the reader with a number of clear scenarios and examples, making it easier to understand and apply the new concepts. Each chapter can be used as a reference, or it can be read from beginning to end, allowing consultants/administrators to build a solid and highly available Exchange 2013 environment. If you are a messaging professional who wants to learn to design a highly available Exchange 2013 environment, this book is for you. Although not a definite requirement, practical experience with Exchange 2010 is expected, without being a subject

  19. How valid are commercially available medical simulators?

    Science.gov (United States)

    Stunt, JJ; Wulms, PH; Kerkhoffs, GM; Dankelman, J; van Dijk, CN; Tuijthof, GJM

    2014-01-01

    Background Since simulators offer important advantages, they are increasingly used in medical education and medical skills training that require physical actions. A wide variety of simulators have become commercially available. It is of high importance that evidence is provided that training on these simulators can actually improve clinical performance on live patients. Therefore, the aim of this review is to determine the availability of different types of simulators and the evidence of their validation, to offer insight regarding which simulators are suitable to use in the clinical setting as a training modality. Summary Four hundred and thirty-three commercially available simulators were found, from which 405 (94%) were physical models. One hundred and thirty validation studies evaluated 35 (8%) commercially available medical simulators for levels of validity ranging from face to predictive validity. Solely simulators that are used for surgical skills training were validated for the highest validity level (predictive validity). Twenty-four (37%) simulators that give objective feedback had been validated. Studies that tested more powerful levels of validity (concurrent and predictive validity) were methodologically stronger than studies that tested more elementary levels of validity (face, content, and construct validity). Conclusion Ninety-three point five percent of the commercially available simulators are not known to be tested for validity. Although the importance of (a high level of) validation depends on the difficulty level of skills training and possible consequences when skills are insufficient, it is advisable for medical professionals, trainees, medical educators, and companies who manufacture medical simulators to critically judge the available medical simulators for proper validation. This way adequate, safe, and affordable medical psychomotor skills training can be achieved. PMID:25342926

  20. High plant availability of phosphorus and low availability of cadmium in four biomass combustion ashes

    DEFF Research Database (Denmark)

    Li, Xiaoxi; Rubæk, Gitte Holton; Sørensen, Peter

    2016-01-01

    and ash significantly increased crop yields and P uptake on the P-depleted soil. In contrast, on the adequate-P soil, the barley yield showed little response to soil amendment, even at 300–500 kg P ha− 1 application, although the barley took up more P at higher applications. The apparent P use efficiency...... of the additive was 20% in ryegrass - much higher than that of barley for which P use efficiencies varied on the two soils. Generally, crop Cd concentrations were little affected by the increasing and high applications of ash, except for relatively high Cd concentrations in barley after applying 25 Mg ha− 1 straw...... ash. Contrarily, even modest increases in the TSP application markedly increased Cd uptake in plants. This might be explained by the low Cd solubility in the ash or by the reduced Cd availability due to the liming effect of ash. High concentrations of resin-extractable P (available P) in the ash...

  1. 24 CFR 110.20 - Availability of posters.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Availability of posters. 110.20... HOUSING FAIR HOUSING POSTER Requirements for Display of Posters § 110.20 Availability of posters. All persons subject to this part may obtain fair housing posters from the Department's regional and area...

  2. Non disponible / Not available

    OpenAIRE

    Muriel , Henry

    2010-01-01

    Non disponible / Not available; L'incidence et la prévalence de l'insuffisance rénale chronique terminale (IRCT) en France sont en augmentation. Lors de cette maladie, la fonction rénale diminue et les reins ne peuvent plus assurer leurs fonctions.Le recours à une technique de suppléance est obligatoire pour vivre.Ces techniques sont la dialyse péritonéale, l'hémodialyse et la greffe rénale.Les patients en insuffisance rénale chronique terminale sont des patients polymédiqués. Il existe de no...

  3. Non disponible / Not available

    OpenAIRE

    Clément , Wielgus

    2013-01-01

    Non disponible / Not available; L'insuffisance rénale chronique touche plus de 2,5 millions de français. Parmi eux, plus de 55000 personnes en stade terminal, doivent recourir à un traitement de suppléance, qui, le plus souvent, est l'hémodialyse. Cette insuffisance rénale terminale est souvent associée et attribuable à d'autres maladies. C'est la diminution du nombre de néphrons sains fonctionnels qui entraîne l'apparition des symptômes de l'insuffisance rénale chronique. Ainsi le syndrome n...

  4. Non disponible / Not available

    OpenAIRE

    Bernard , Nguyen

    2001-01-01

    Non disponible / Not available; La chronobiologie est une science récente qui apporte une nouvelle manière de voir la médecine. La chronobiologie, grâce aux développements des moyens techniques de mesure physiologique, a contribué à faire d'importants progrès dans les connaissances tant dans le domaine de la physiologie que de la pathologie ou de la thérapeutique. Et son étude dans l'hypertension artérielle semble logique, puisqu'en France cette pathologie touche jusqu'à 20 à 30% de la popula...

  5. Non disponible / Not available

    OpenAIRE

    Alexandre , Eichelberger

    2010-01-01

    Non disponible / Not available; Les objectifs de cette contribution sont d'exposer la relation qui existe entre la lumière et la matière. L'approche que nous avons de la couleur d'un matériau de restauration est mise en évidence tant au niveau de sa perception que de la relation qu'elle peut avoir avec la translucidité de celui-ci. La structure et la composition des céramiques dentaires et des résinescomposites sont exposées de manière à mieux comprendre les différentes difficultés de choix d...

  6. Non disponible / Not available

    OpenAIRE

    Marion , Panek

    2009-01-01

    Non disponible / Not available; La peur du chirurgien-dentiste est un problème sérieux et très répandu. Chez les enfants, elle est la principale cause de difficultés comportementales au fauteuil, d'interférences avec le bon déroulement des séances et parfois d'orientation vers des structures spécialisées. Cela engendre bien souvent des conséquences négatives pour la santé buccodentaires du jeune patient sans oublier l'impact émotionnel (honte, impuissance ). Cependant des soins dentaires de b...

  7. Non disponible / Not available

    OpenAIRE

    Aurélie , Moronval

    2012-01-01

    Non disponible / Not available; Après différents rappels sur la structure du parodonte et des parodontopathies, nous étudierons l'influence du régime alimentaire sur la santé parodontale. Nous analyserons les propriétés physiques et chimiques des aliments pour connaître leur influence sur la santé des tissus parodontaux. Diététique et parodontopathies sont fortement liées. Un régime alimentaire équilibré combiné à une bonne hygiène buccale participe à la prévention des pathologies buccales....

  8. Non disponible / Not available

    OpenAIRE

    Frédéric , Pitetti

    2004-01-01

    Non disponible / Not available; L'article R5015-G du Code de déontologie impose au pharmacien de « faire preuve du même dévouement envers toutes les personnes qui ont recours à son art». Par conséquent, les pharmaciens doivent être capables de s'adapter et de trou ver des solutions pour communiquer avec les personnes étrangères, illettrées, aveugles ou sourdes . Dans cette thèse, nous nous intéressons à la relation de communication entre le pharmacien et le sourd profond .Dans la partie bibli...

  9. High Availability of RAPIENET

    International Nuclear Information System (INIS)

    Yoon, G.; Oh, J. S.; Kwon, D. H.; Kwon, S. C.; Park, Y. O.

    2012-01-01

    Many industrial customers are no longer satisfies with conventional Ethernet-based communications. They require a more accurate, more flexible, and more reliable technology for their control and measurement systems. Hence, Ethernet-based high-availability networks are becoming an important topic in the control and measurement fields. In this paper, we introduce a new redundant programmable logic controller (PLC) concept, based on real-time automation protocols for industrial Ethernet (RAPIEnet). RAPIEnet has intrinsic redundancy built into its network topology, with hardware-based recovery time. We define a redundant PLC system switching model and demonstrate its performance, including RAPIEnet recovery time

  10. 40 CFR 799.11 - Availability of test guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Availability of test guidelines. 799.11... General Provisions § 799.11 Availability of test guidelines. (a) The TSCA and FIFRA guidelines for the...-487-4650). (b) The OECD guidelines for the various study plans are available from the following...

  11. 46 CFR 76.10-3 - Water availability.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Water availability. 76.10-3 Section 76.10-3 Shipping... Fire Main System, Details § 76.10-3 Water availability. (a) On all vessels on an international voyage, regardless of the date of construction, water pressure from the firemain protecting enclosed spaces shall be...

  12. Ground-Water Availability in the United States

    Science.gov (United States)

    Reilly, Thomas E.; Dennehy, Kevin F.; Alley, William M.; Cunningham, William L.

    2008-01-01

    Ground water is among the Nation's most important natural resources. It provides half our drinking water and is essential to the vitality of agriculture and industry, as well as to the health of rivers, wetlands, and estuaries throughout the country. Large-scale development of ground-water resources with accompanying declines in ground-water levels and other effects of pumping has led to concerns about the future availability of ground water to meet domestic, agricultural, industrial, and environmental needs. The challenges in determining ground-water availability are many. This report examines what is known about the Nation's ground-water availability and outlines a program of study by the U.S. Geological Survey Ground-Water Resources Program to improve our understanding of ground-water availability in major aquifers across the Nation. The approach is designed to provide useful regional information for State and local agencies who manage ground-water resources, while providing the building blocks for a national assessment. The report is written for a wide audience interested or involved in the management, protection, and sustainable use of the Nation's water resources.

  13. Availability analysis of supervised protective systems

    International Nuclear Information System (INIS)

    Kontoleon, N.; Kontoleon, J.M.; Chrysochoides, N.G.

    1975-01-01

    The behaviour in time of a nuclear reactor supervised protective system is modelled mathematically by a Markov process, continuous in time and with three discrete states. Failure and repair rates are assumed to be exponentially distributed. An analytical expression of system availability as a function of failure and repair rates as well as the inspection intervals and duration is derived. An optimization problem is then discussed in order to maximize system availability with respect to imposed cost constraints. Finally, an example of a supervised protective system with short inactive times is given, which may be found in many practical situations of modern protective systems. (author)

  14. Available transmission capacity assessment

    Directory of Open Access Journals (Sweden)

    Škokljev Ivan

    2012-01-01

    Full Text Available Effective power system operation requires the analysis of vast amounts of information. Power market activities expose power transmission networks to high-level power transactions that threaten normal, secure operation of the power system. When there are service requests for a specific sink/source pair in a transmission system, the transmission system operator (TSO must allocate the available transfer capacity (ATC. It is common that ATC has a single numerical value. Additionally, the ATC must be calculated for the base case configuration of the system, while generation dispatch and topology remain unchanged during the calculation. Posting ATC on the internet should benefit prospective users by aiding them in formulating their requests. However, a single numerical value of ATC offers little for prospect for analysis, planning, what-if combinations, etc. A symbolic approach to the power flow problem (DC power flow and ATC offers a numerical computation at the very end, whilst the calculation beforehand is performed by using symbols for the general topology of the electrical network. Qualitative analysis of the ATC using only qualitative values, such as increase, decrease or no change, offers some new insights into ATC evaluation, multiple transactions evaluation, value of counter-flows and their impact etc. Symbolic analysis in this paper is performed after the execution of the linear, symbolic DC power flow. As control variables, the mathematical model comprises linear security constraints, ATC, PTDFs and transactions. The aim is to perform an ATC sensitivity study on a five nodes/seven lines transmission network, used for zonal market activities tests. A relatively complicated environment with twenty possible bilateral transactions is observed.

  15. Restrictions in Availability of Drugs Used for Suicide

    DEFF Research Database (Denmark)

    Nordentoft, Merete

    2007-01-01

    Availability of drugs with high lethality has been hypothesized to increase the risk of self-poisoning suicides. A literature search concerning deliberate self-poisoning and the effect of restricting access to drugs was conducted, and the effect of restrictions in availability of barbiturates, tr...... in availability of drugs with high case fatality should be a part of suicide prevention strategies.......Availability of drugs with high lethality has been hypothesized to increase the risk of self-poisoning suicides. A literature search concerning deliberate self-poisoning and the effect of restricting access to drugs was conducted, and the effect of restrictions in availability of barbiturates......, tricyclic antidepressants, dextropropoxyphene, and weak analgesics was reviewed. The correlations between method-specific and overall suicide rates and sales figures for barbiturates, dextropropoxyphene, weak analgesics, and tricyclic antidepressants were reviewed. It is concluded that restriction...

  16. A List of Astronomical Meetings Available via Mosaic

    Science.gov (United States)

    Bryson, E.; Crabtree, D.

    We have been making a list of astronomical and related meetings available electronically for a number of years. Recently, several meeting organizers have made information about their meetings available via anonymous ftp or even NCSA Mosaic. We have produced a new version of our electronic meeting list available via NCSA Mosaic which provides links to the information being provided electronically. Depending upon the amount of information being provided for an individual meeting, it may be possible for a user browsing the list of meetings to click on the meeting of interest, fill out a registration form, download maps, browse abstracts, etc. We hope the availability of this service will encourage other meeting organizers to make information about their meetings available electronically and to take advantage of new technology such as NCSA Mosaic. URL: http:// cadcwww.dao.nrc.calmeetings/meetings.html

  17. Non disponible / Not available

    OpenAIRE

    Erika , Nnang Obada

    2010-01-01

    Non disponible / Not available; La préservation du capital vasculaire est un challenge permanent dans la prise en charge des patients insuffisants rénaux chroniques. Cette démarche doit être systématique, précoce, même en situation d'insuffisance rénale aiguë. La mise en place de cathéters pour l'hémodialyse doit être encadrée. Tout dysfonctionnement réduit l'efficacité d'une séance de dialyse avec une morbidité non négligeable. Dans une étude rétrospective de 62 patients hémodialysés inciden...

  18. Non disponible / Not available

    OpenAIRE

    Edouard , Kunegel

    2013-01-01

    Non disponible / Not available; Seules trois méthodes de traitement, aujourd'hui, s'offrent au patient insuffisant rénal chronique (IRC) en phase terminale : la dialyse péritonéale, l'hémodialyse, et la transplantation rénale. L'esquisse de ces techniques sera dessinée au fil de ce travail, avec un focus particulier sur l'hémodialyse, méthode à ce jour encore la plus utilisée. À ses débuts, les résultats proposés par cette procédure, assortis d'une lourde mortalité, étaient peu concluants.Jus...

  19. Non disponible / Not available

    OpenAIRE

    Pierre , Cuny

    2007-01-01

    Non disponible / Not available; La restauration des dents antérieures par la céramique collée impose une réussite au niveau de la biocompatibilité, de la forme mais également de la couleur du résultat définitif. En raison de l'opacité variable des céramiques utilisées, les industriels proposent des polymères de collage dont le mécanisme de prise est dit « dual ». Une gamme étendue de couleur de ces polymères decollage ainsi que des niveaux d'opacité variable permettent de répondre au mieux à ...

  20. Non disponible / Not available

    OpenAIRE

    Julie , Grandjean

    2010-01-01

    Non disponible / Not available; Un Plan de lutte contre le cancer a été ouvert en 2002 à l'initiative du Président de la République, Jacques Chirac. Il combine un ensemble de 70 Mesures échelonnées d'avril 2003 à décembre 2007, avec pour objectif vaincre la maladie et diminuer la mortalité par cancer de 20% pour 2007. Dans ce contexte, la réalisation d'un audit est apparue pertinente pour faire un état des lieux sur la prise en charge des patients traités par chimiothérapie anticancéreuse au ...

  1. Non disponible / Not available

    OpenAIRE

    Diane , François

    2010-01-01

    Non disponible / Not available; Le millepertuis ou Hypericum perforatum L. est connu depuis l'antiquité, où il était utilisé pour soigner les blessures. Au Moyen-Age, appelé « chasse-diable », il était utilisé pour éloigner les mauvais esprits. Aujourd'hui, il est connu pour ses propriétés antidépressives.Il est efficace dans les dépressions légères à modérées, ses propriétés antidépressives sont dues principalement à l'hyperforine.La sommité fleurie est inscrite à la Pharmacopée européenne d...

  2. VT Data - Parcels Available by Town

    Data.gov (United States)

    Vermont Center for Geographic Information — Vermont parcel data, downloadable by individual municipality. Includes:standardized parcel-data (where available), most of which is provided via the Statewide...

  3. Pediatric Inpatient Headache Therapy: What is Available.

    Science.gov (United States)

    Kabbouche, Marielle

    2015-01-01

    Status migrainosus is defined by the international classification of headache disorders (ICHD) criteria as a debilitating migraine lasting more then 72 hours. The epidemiology of status migrainosus is still unknown in adult and children, and frequently underdiagnosed. Children and adolescents often end up in the emergency room with an intractable headache that failed outpatient therapy. Six to seven percent of these children do not respond to acute infusion therapy and require hospitalization. It is imperative that more aggressive therapy is considered when patients are affected by a severe intractable headache to prevent further disability and returning the child to baseline activity. Multiple therapies are available for adults and children. Studies for acute therapy in the emergency room are available in adults and pediatric groups. Small studies are available for inpatient therapy in children and, along with available therapies for children and adolescents, are described in this review. A review of the literature shows growing evidence regarding the use of dihydroergotamine intravenously once patients are hospitalized. Effectiveness and safety have been proven in the last decades in adults and small studies in the pediatric populations. © 2015 American Headache Society.

  4. Availability analysis of selected mining machinery

    Directory of Open Access Journals (Sweden)

    Brodny Jarosław

    2017-06-01

    Full Text Available Underground extraction of coal is characterized by high variability of mining and geological conditions in which it is conducted. Despite ever more effective methods and tools, used to identify the factors influencing this process, mining machinery, used in mining underground, work in difficult and not always foreseeable conditions, which means that these machines should be very universal and reliable. Additionally, a big competition, occurring on the coal market, causes that it is necessary to take action in order to reduce the cost of its production, e.g. by increasing the efficiency of utilization machines. To meet this objective it should be pro-ceed with analysis presented in this paper. The analysis concerns to availability of utilization selected mining machinery, conducted using the model of OEE, which is a tool for quantitative estimate strategy TPM. In this article we considered the machines being part of the mechanized longwall complex and the basis of analysis was the data recording by the industrial automation system. Using this data set we evaluated the availability of studied machines and the structure of registered breaks in their work. The results should be an important source of information for maintenance staff and management of mining plants, needed to improve the economic efficiency of underground mining.

  5. Availability statistics for thermal power plants

    International Nuclear Information System (INIS)

    1990-01-01

    Denmark, Finland and Sweden have adopted almost the same methods of recording and calculation of availability data. For a number of years comparable availability and outage data for thermal power have been summarized and published in one report. The purpose of the report now presented for 1990 containing general statistical data is to produce basic information on existing kinds of thermal power in the countries concerned. With this information as a basis additional and more detailed information can be exchanged in direct contacts between bodies in the above mentioned countries according to forms established for that purpose. The report includes fossil steam power, nuclear power and gas turbines. The information is presented in separate diagrams for each country, but for plants burning fossil fuel also in a joint NORDEL statistics with data grouped according to type of fuel used. The grouping of units into classes of capacity has been made in accordance with the classification adopted by UNIPEDE/WEC. Values based on energy have been adopted as basic availability data. The same applied to the preference made in the definitions outlined by UNIPEDE and UNIPEDE/WEC. Some data based on time have been included to make possible comparisons with certain international values and for futher illustration of the performance. (au)

  6. Water on Mars - Volatile history and resource availability

    Science.gov (United States)

    Jakosky, Bruce M.

    1990-01-01

    An attempt is made to define the available deposits of water in the near-surface region of Mars which will be available to human exploration missions. The Martian seasonal water cycle is reviewed, and geochemical and geological constraints on the availability of water are examined. It is concluded that the only sure source of water in amounts significant as a resource are in the polar ice deposits.

  7. Savannah River Site Surplus Facilities Available for Reuse

    International Nuclear Information System (INIS)

    Clarke, R.M.; Owens, M.B.; Lentz, D.W.

    1995-01-01

    The purpose of this document is to provide a current, centralized list of Savannah River Site facilities, which are surplus and available for reuse. These surplus facilities may be made available for other DOE site missions, commercial economic development reuse, or other governmental reuse. SRS procedures also require that before new construction can be approved, available surplus facilities are screened for possible reuse in lieu of the proposed new construction

  8. DOE Patents Available for Licensing

    International Nuclear Information System (INIS)

    Stuber, C.

    1981-01-01

    DOE Patents Available for Licensing (DOE PAL) provides abstracting and indexing coverage of the DOE patent literature, including patent applications, that concerns any apsect of energy production, conservation, and utilization. The citations are arranged by subject category. DOE is prepared to grant exclusive or nonexclusive, revocable licenses under DOE-owned US patents and patent applications in accordance with the provisions of 10CFR781

  9. Non disponible / Not available

    OpenAIRE

    Nicolas , Laurent

    2013-01-01

    Non disponible / Not available; Nous avons étudié de manière rétrospective la survie et les complications péri opératoires au sein de deux groupes de patients octogénaires ayant bénéficié dans notre centre de l'implantation d'une bioprothèse par méthode TAVI ou par chirurgie conventionnelle. Les deux groupes ont été appareillés par un score de propensité. Entre juillet 2009 et juin 2013, 97 octogénaires ont bénéficié d'un TAVI dans notre centre. Nous avons identifié un groupe contrôle de 220 ...

  10. Non disponible / Not available

    OpenAIRE

    Térence , Courbariaux

    2006-01-01

    Non disponible / Not available; Suite à la parution de l'article R.5104-15 du code de la santé publique 2003 relatif aux responsabilités portées par les pharmacies à usage intérieur, le CHU de Brabois a fait le pari de remplacer une partie du matériel stérile par de l'usage unique. Cette décision a nécessité la mise en place d'une centrale d'approvisionnement en matériel stérile (CAMS). Afin de se prévenir des risques de rupture et de péremption, des techniques de gestion du stock de DMS ont ...

  11. Spent-fuel transport: available as needed

    International Nuclear Information System (INIS)

    Macklin, L.

    1976-01-01

    As a result of the general uncertainty as to when commercial reprocessing will actually take place in the United States (U.S.) and the long lead times now required before bringing a spent-fuel cask system in operation, it appears that serious problems can arise by 1979-1980 in cask capacity availability. Compounding the uncertainty with respect to cask capacity availability is the position taken by some of the U.S. railroad systems and some state and local governmental agencies in imposing restraints in the movement of spent fuel. By utility companies taking risk in committing to casks in advance of the actual requirement dates and by cask suppliers assuming the risks of licensing, costs, and delivery schedules, this potential bottleneck could be minimized

  12. Test System Impact on System Availability

    DEFF Research Database (Denmark)

    Pau, L. F.

    1987-01-01

    The specifications are presented for an imperfect automatic test system (ATS) (test frequency distribution, reliability, false alarm rate, nondetection rate) in order to account for the availability, readiness, mean time between unscheduled repairs (MTBUR), reliability, and maintenance of the sys......The specifications are presented for an imperfect automatic test system (ATS) (test frequency distribution, reliability, false alarm rate, nondetection rate) in order to account for the availability, readiness, mean time between unscheduled repairs (MTBUR), reliability, and maintenance...... of the system subject to monitoring and test. A time-dependent Markov model is presented, and applied in three cases, with examples of numerical results provided for preventive maintenance decisions, design of an automatic test system, buffer testing in computers, and data communications....

  13. 75 FR 76999 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Science.gov (United States)

    2010-12-10

    ... $5 million shall be made available for rural capacity building activities. This competition is... Foundation), the Local Initiatives Support Corporation (LISC), and Habitat for Humanity International. The...

  14. Probability matching and strategy availability

    OpenAIRE

    J. Koehler, Derek; Koehler, Derek J.; James, Greta

    2010-01-01

    Findings from two experiments indicate that probability matching in sequential choice arises from an asymmetry in strategy availability: The matching strategy comes readily to mind, whereas a superior alternative strategy, maximizing, does not. First, compared with the minority who spontaneously engage in maximizing, the majority of participants endorse maximizing as superior to matching in a direct comparison when both strategies are described. Second, when the maximizing strategy is brought...

  15. Sustainable Availability Provision in Distributed Cloud Services

    OpenAIRE

    Yanovskaya, O; Yanovsky, M; Kharchenko, V; Kor, A; Pattinson, C

    2017-01-01

    The article is an extension of this paper 1 . It describes methods for dealing with reliability and fault tolerance issues in cloud-based datacenters. These methods mainly focus on the elimination of a single point of failure within any component of the cloud infrastructure, availability of infrastructure and accessibility of cloud services. Methods for providing the availability of hardware, software and network components are also presented. The analysis of the actual accessibility of cloud...

  16. Learning and Development Policy available on HR web

    CERN Multimedia

    2012-01-01

    The full text of CERN’s “Learning and Development Policy” is now available in English and French on the HR training website: cern.ch/hr-training/. This new policy was presented to all personnel in the HR Public meeting held on Monday 25 June, and the slides and the video recording remain available on Indico. Pascale Goy, Head of the Learning and Development Group in HR, is available for more information: pascale.goy@cern.ch , tel. 62232.

  17. Availability Analysis of the Ventilation Stack CAM Interlock System

    International Nuclear Information System (INIS)

    YOUNG, J.

    2000-01-01

    Ventilation Stack Continuous Air Monitor (CAM) Interlock System failure modes, failure frequencies and system availability have been evaluated for the RPP. The evaluation concludes that CAM availability is as high as assumed in the safety analysis and that the current routine system surveillance is adequate to maintain this availability. Further, requiring an alarm to actuate upon CAM failure is not necessary to maintain the availability credited in the safety analysis, nor is such an arrangement predicted to significantly improve system availability. However, if CAM failures were only detected by the 92-day functional tests required in the Authorization Basis (AB), CAM availability would be much less than that credited in the safety analysis. Therefore it is recommended that the current surveillance practice of daily simple system checks, 30-day source checks and 92-day functional tests be continued in order to maintain CAM availability

  18. Mechanisms available for cooling plants’ surfaces

    Directory of Open Access Journals (Sweden)

    Prokhorov Alexey Anatolievich

    2016-12-01

    Full Text Available The essay briefly touches upon the main mechanisms to cool down the plats’ surfaces that lead to condensation of atmospheric moisture; methods for experimental verification of these mechanisms are presented therein.

  19. Shielding design for better plant availability

    International Nuclear Information System (INIS)

    Biro, G.G.

    1975-01-01

    Design methods are described for providing a shield system for nuclear power plants that will facilitate maintenance and inspection, increase overall plant availability, and ensure that man-rem exposures are as low as practicable

  20. Estimates of LLEA officer availability

    International Nuclear Information System (INIS)

    Berkbigler, K.P.

    1978-05-01

    One element in the Physical Protection of Nuclear Material in Transit Program is a determination of the number of local law enforcement agency (LLEA) officers available to respond to an attack upon a special nuclear material (SNM) carrying convoy. A computer model, COPS, has been developed at Sandia Laboratories to address this problem. Its purposes are to help identify to the SNM shipper areas along a route which may have relatively low police coverage and to aid in the comparison of alternate routes to the same location. Data bases used in COPS include population data from the Bureau of Census and police data published by the FBI. Police are assumed to be distributed in proportion to the population, with adjustable weighting factors. Example results illustrating the model's capabilities are presented for two routes between Los Angeles, CA, and Denver, CO, and for two routes between Columbia, SC, and Syracuse, NY. The estimated police distribution at points along the route is presented. Police availability as a function of time is modeled based on the time-dependent characteristics of a trip. An example demonstrating the effects of jurisdictional restrictions on the size of the response force is given. Alternate routes between two locations are compared by means of cumulative plots

  1. Water Availability as a Measure of Cellulose Hydrolysis Efficiency

    DEFF Research Database (Denmark)

    Hsieh, Chia-Wen

    of sugars, salts, and surfactants impact the water relaxation time. Systems with high concentrations of sugars and salts tend to have low water availability, as these form strong interactions with water to keep their solubility, leaving less water available for hydrolysis. Thus, cellulase performance...... decreases. However, the addition of surfactants such as polyethylene glycol (PEG) increases the water mobility, leading to higher water availability, and ultimately higher glucose production. More specifically, the higher water availability boosts the activity of processive cellulases. Thus, water...... availability is vital for efficient hydrolysis, especially at high dry matter content where water availability is low. At high dry matter content, cellulase activity changes water interactions with biomass, affecting the water mobility. While swelling and fiber loosening also take place during hydrolysis...

  2. 38 CFR 61.60 - Notice of Fund Availability.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.60 Notice of Fund Availability. When funds are made available for capital grants, per diem for non-capital grant recipients, special needs grants...

  3. Availability objectives integration to design. The CIDEM approach

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    1994-01-01

    Considering the operation experience feedback from its nuclear park and from foreign parks, and considering new approaches and design tools such as concurrent engineering, total quality, etc., EDF (Electricite de France) has decided to start the CIDEM approach (integration of availability, operating experience feedback and maintenance into design), an analytical and systematical study process for new projects (REP2000 (or PWR2000)), in order to optimize as much as possible the design phase while integrating maintenance, availability and safety objectives, with the view of a minimized kWh cost. This process, already used in other industries, employs concepts such as RAM (Reliability Availability Maintainability), RCM (Reliability Centered Maintenance) and ILS (Integrated Logistic Support). The availability and maintenance scheduling studies for the REP2000 project are detailed. 10 fig., 6 tab

  4. Availability of crop cellulosics for ethanol production

    Energy Technology Data Exchange (ETDEWEB)

    Hayes, R.D.

    1982-10-01

    Past estimates of cellulosic resources available from Canadian agriculture totalled over 23 million tonnes of cereal grain straw and corn stover residues surplus to soil and animal requirements. A new much reduced estimate, based on four detailed regional studies that also include previously unassessed resources such as chaff, oilseed hulls, and food processing wastes, is suggested. Eleven million tonnes are currently available from all residue sources for energy conversion by different processes. Only five million tonnes are identified as potentially usable in ethanol production plants were they to be constructed. Additional resource opportunities may become available in future from currently underutilized land, especially saline soils, novel processing techniques of conventional grains and forages, innovative cropping systems that may increase the yield of agricultural biomass, and new food/feed/fuel (i.e. multi-purpose) crops such as kochia, milkweed, and Jerusalem artichoke. 27 refs., 1 fig., 1 tab.

  5. International availability of energy minerals

    Energy Technology Data Exchange (ETDEWEB)

    White, N A [Norman White Associates, London (UK)

    1979-06-01

    Whereas the ultimate world supply of energy minerals - defined as fossil fuels and fissile minerals - is controlled by geological factors, the actual supply at any particular time is controlled by economic feasibility, technological innovations and/or political decisions. This paper identifies and discusses the principal uncertainties surrounding the international availability of energy minerals from now until the end of the century. A brief comparison is also made between energy and non-energy minerals.

  6. Availability Analysis of the Ventilation Stack CAM Interlock System

    CERN Document Server

    Young, J

    2000-01-01

    Ventilation Stack Continuous Air Monitor (CAM) Interlock System failure modes, failure frequencies, and system availability have been evaluated for the RPP. The evaluation concludes that CAM availability is as high as assumed in the safety analysis and that the current routine system surveillance is adequate to maintain this availability credited in the safety analysis, nor is such an arrangement predicted to significantly improve system availability.

  7. Machine availability at the Large Hardron Collider

    CERN Document Server

    Pojer, M; Wagner, S

    2012-01-01

    One of the most important parameters for a particle accelerator is its uptime, the period of time when it is functioning and available for use. In its second year of operation, the Large Hadron Collider (LHC) has experienced high machine availability, which is one of the ingredients of its brilliant performance. Some of the reasons for the observed MTBF are presented. The approach of periodic maintenance stops is also discussed. Some considerations on the ideal length of a physics fill are drawn.

  8. Machine availability at the Large Hardron Collider

    OpenAIRE

    Pojer, M; Schmidt, R; Wagner, S

    2012-01-01

    One of the most important parameters for a particle accelerator is its uptime, the period of time when it is functioning and available for use. In its second year of operation, the Large Hadron Collider (LHC) has experienced high machine availability, which is one of the ingredients of its brilliant performance. Some of the reasons for the observed MTBF are presented. The approach of periodic maintenance stops is also discussed. Some considerations on the ideal length of a physics fill are dr...

  9. Availability of high quality weather data measurements

    DEFF Research Database (Denmark)

    Andersen, Elsa; Johansen, Jakob Berg; Furbo, Simon

    In the period 2016-2017 the project “Availability of high quality weather data measurements” is carried out at Department of Civil Engineering at the Technical University of Denmark. The aim of the project is to establish measured high quality weather data which will be easily available...... for the building energy branch and the solar energy branch in their efforts to achieve energy savings and for researchers and students carrying out projects where measured high quality weather data are needed....

  10. Increasing biomass resource availability through supply chain analysis

    International Nuclear Information System (INIS)

    Welfle, Andrew; Gilbert, Paul; Thornley, Patricia

    2014-01-01

    Increased inclusion of biomass in energy strategies all over the world means that greater mobilisation of biomass resources will be required to meet demand. Strategies of many EU countries assume the future use of non-EU sourced biomass. An increasing number of studies call for the UK to consider alternative options, principally to better utilise indigenous resources. This research identifies the indigenous biomass resources that demonstrate the greatest promise for the UK bioenergy sector and evaluates the extent that different supply chain drivers influence resource availability. The analysis finds that the UK's resources with greatest primary bioenergy potential are household wastes (>115 TWh by 2050), energy crops (>100 TWh by 2050) and agricultural residues (>80 TWh by 2050). The availability of biomass waste resources was found to demonstrate great promise for the bioenergy sector, although are highly susceptible to influences, most notably by the focus of adopted waste management strategies. Biomass residue resources were found to be the resource category least susceptible to influence, with relatively high near-term availability that is forecast to increase – therefore representing a potentially robust resource for the bioenergy sector. The near-term availability of UK energy crops was found to be much less significant compared to other resource categories. Energy crops represent long-term potential for the bioenergy sector, although achieving higher limits of availability will be dependent on the successful management of key influencing drivers. The research highlights that the availability of indigenous resources is largely influenced by a few key drivers, this contradicting areas of consensus of current UK bioenergy policy. - Highlights: • As global biomass demand increases, focus is placed indigenous resources. • A Biomass Resource Model is applied to analyse UK biomass supply chain dynamics. • Biomass availability is best increased

  11. Materials availability for large-scale thin-film photovoltaics

    International Nuclear Information System (INIS)

    Andersson, Bjoern A.

    2000-01-01

    The objective of this paper is to discuss to what extent materials availability could restrain the expansion of PV systems based on CdTe, CIGS, aSiGe and nanocrystalline dye-sensitised cells. The investigated elements are cadmium, tellurium, indium, gallium, selenium, germanium and ruthenium. Materials requirement, annual availability and available stock of resources are assessed. The material constrained growth of installed capacity in the year 2020 is estimated at about 20 GWp/year for CdTe and dye-sensitise cells, 70 GWp/year for CIGS and 200 GWp/year for aSiGe. These potentials are reached through decreased materials requirement and increased materials availability. Metal prices are assumed to rise. With pessimistic assumptions, the potential decrease by one or two orders of magnitude. Implications for public policy and firm strategy are briefly discussed. (Author)

  12. 76 FR 24539 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-05-02

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . Electronic copies... NUCLEAR REGULATORY COMMISSION [NRC-2010-0181] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide...

  13. 75 FR 42170 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-07-20

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0425] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide...

  14. 75 FR 48381 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-10

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0274] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance and availability of Regulatory Guide...

  15. 75 FR 58444 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-09-24

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0305] Draft Regulatory Guide: Issuance, Availability... Guide, DG-1244, ``Availability of Electric Power Sources.'' FOR FURTHER INFORMATION CONTACT: Satish...

  16. Availability analysis of the ITER blanket remote handling system

    International Nuclear Information System (INIS)

    Maruyama, Takahito; Noguchi, Yuto; Takeda, Nobukazu; Kakudate, Satoshi

    2015-01-01

    The ITER blanket remote handling system (BRHS) is required to replace 440 blanket first wall panels in a two-year maintenance period. To investigate this capability, an availability analysis of the system was carried out. Following the analysis procedure defined by the ITER organization, the availability analysis consists of a functional analysis and a reliability block diagram analysis. In addition, three measures to improve availability were implemented: procurement of spare parts, in-vessel replacement of cameras, and simultaneous replacement of umbilical cables. The availability analysis confirmed those measures improve the availability and capability of the BRHS to replace 440 blanket first wall panels in two years. (author)

  17. Guide to commercially available wind machines

    Energy Technology Data Exchange (ETDEWEB)

    1978-04-03

    Wind Energy Conversion Systems (WECS) commercially available in the United States are described. The terms used to describe these wind systems are defined and their significance discussed. Lists of manufacturers and distributors, subsystem components and suppliers, and references are provided.

  18. Availability model of stand-alone photovoltaic system

    Science.gov (United States)

    Mazurek, G.

    2017-08-01

    In this paper we present a simple, empirical model of stand-alone photovoltaic power system availability. The model is a final result of five-year long studies and ground measurements of solar irradiation carried out in Central Europe. The obtained results facilitate sizing of PV modules that have to be installed with taking into account system's availability level in each month of a year. The model can be extended to different geographical locations, with help of local meteorological data or solar irradiation datasets derived from satellite measurements.

  19. 48 CFR 31.002 - Availability of accounting guide.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Availability of accounting... GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES 31.002 Availability of accounting guide. Contractors needing assistance in developing or improving their accounting systems and procedures...

  20. 75 FR 74053 - Availability of Final Toxicological Profiles

    Science.gov (United States)

    2010-11-30

    ... CONTACT: Ms. Olga Dawkins, Division of Toxicology and Environmental Medicine, Agency for Toxic Substances... Toxicology and Environmental Medicine, Agency for Toxic Substances and Disease Registry, 4700 Buford Highway..., except legal holidays. Availability This notice announces the availability of one new and six updated...

  1. The availability of irradiation data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    Solar radiation at ground level is a necessary input for performances modeling and sizing of PV systems. This document reports on the needs for data and discusses the problems faced by users when accessing data. It then presents some technological solutions. Users generally need values of global daily or hourly irradiation with a spatial resolution of approximately 10 km. Relative errors (RMSE) of daily irradiation should be less than 20 %. Spatial coverage (continent) and temporal coverage are of importance. The data must be available conveniently at low cost. Several regional solar atlases have been made by interpolation of ground measurements, taking into account the local variation of climate. Satellite data produce irradiation maps offering a regular sampling in space and a wide geographical coverage. Time-series are also obtained by weather forecast models. Digital atlases have been created as integrated information system. These comprise a database and software to exploit it. The co-operative systems are connected with other servers that provide necessary weather data to compute solar radiation quantities. This survey of solar databases showed that in a general case, there is a discrepancy between users needs and available databases. This conclusion supports the efforts made in integrating information systems and co-operative systems to overcome the technical limits of measurements by using the information and communication technologies. (au)

  2. Climate Change and Fish Availability

    Science.gov (United States)

    Teng, Paul P. S.; Lassa, Jonatan; Caballero-Anthony, Mely

    Human consumption of fish has been trending upwards in the past decades and this is projected to continue. The main sources of fish are from wild fisheries (marine and freshwater) and aquaculture. Climate change is anticipated to affect the availability of fish through its effect on these two sources as well as on supply chain processes such as storage, transport, processing and retail. Climate change is known to result in warmer and more acid oceans. Ocean acidification due to higher CO2 concentration levels at sea modifies the distribution of phytoplankton and zooplankton to affect wild, capture fisheries. Higher temperature causes warm-water coral reefs to respond with species replacement and bleaching, leading to coral cover loss and habitat loss. Global changes in climatic systems may also cause fish invasion, extinction and turnover. While this may be catastrophic for small scale fish farming in poor tropical communities, there are also potential effects on animal protein supply shifts at local and global scales with food security consequences. This paper discusses the potential impacts of climate change on fisheries and aquaculture in the Asian Pacific region, with special emphasis on Southeast Asia. The key question to be addressed is “What are the impacts of global climate change on global fish harvests and what does it mean to the availability of fish?”

  3. Optimizing the availability of a buffered industrial process

    Science.gov (United States)

    Martz, Jr., Harry F.; Hamada, Michael S.; Koehler, Arthur J.; Berg, Eric C.

    2004-08-24

    A computer-implemented process determines optimum configuration parameters for a buffered industrial process. A population size is initialized by randomly selecting a first set of design and operation values associated with subsystems and buffers of the buffered industrial process to form a set of operating parameters for each member of the population. An availability discrete event simulation (ADES) is performed on each member of the population to determine the product-based availability of each member. A new population is formed having members with a second set of design and operation values related to the first set of design and operation values through a genetic algorithm and the product-based availability determined by the ADES. Subsequent population members are then determined by iterating the genetic algorithm with product-based availability determined by ADES to form improved design and operation values from which the configuration parameters are selected for the buffered industrial process.

  4. ANALYSIS OF AVAILABILITY AND RELIABILITY IN RHIC OPERATIONS

    International Nuclear Information System (INIS)

    PILAT, F.; INGRASSIA, P.; MICHNOFF, R.

    2006-01-01

    RHIC has been successfully operated for 5 years as a collider for different species, ranging from heavy ions including gold and copper, to polarized protons. We present a critical analysis of reliability data for RHIC that not only identifies the principal factors limiting availability but also evaluates critical choices at design times and assess their impact on present machine performance. RHIC availability data are typical when compared to similar high-energy colliders. The critical analysis of operations data is the basis for studies and plans to improve RHIC machine availability beyond the 50-60% typical of high-energy colliders

  5. Implementasi Highly Available Website Dengan Distributed Replicated Block Device

    Directory of Open Access Journals (Sweden)

    Mulyanto Mulyanto

    2016-07-01

    Full Text Available As an important IT infrastructure, website is a system which requires high reliability and availability levels. Website meets the criteria as a highly available system because website must provide services to clients in real time, handle a large amount of data, and not lose data during transaction. A highly available system must meet the condition of being able to run continuously as well as guaranteeing consistency on data requests. This study designed a website with high availability. The approach was building network cluster with failover and replicated block device functions. Failover was built to provide service availability, while replicated block device provides data consistency during failure of service.  With failover cluster and replicated block device approaches, a cluster which is able to handle service failures of web server and database server on the website. The result of this study was the services of the website could run well if there was any failure in node members of the cluster. The system was able to provide 99,999 (five nines availability on database server services and 99,98  (three nines on web server services.

  6. 78 FR 56720 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2013-09-13

    ...: Prototype. In vivo data available (animal). In vivo data available (human). Inventors: Robert Lederman and... data available (animal). Inventors: Anu Puri (NCI) et al. Publications: 1. Yavlovich A, et al. Design... application in large part because delivery technologies for these therapies are not effective. Most nucleic...

  7. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    Background: Facilities and equipment are known to contribute to improved patient care and outcome. Hospitals for sub‑specialized pediatric anesthetic service are routinely available worldwide. In Nigeria, such hospitals now exist. It is therefore relevant to study the facilities and equipment available for pediatric anesthetic ...

  8. ASA24-Kids (no longer available)

    Science.gov (United States)

    ASA24-Kids-2014 was released in February 2014 and until March 2017, researchers can register new studies in this version of the ASA24® system. Funding is not currently available for a mobile accessible version for kids, such as ASA24-2016.

  9. Data on fossil fuel availability for Shared Socioeconomic Pathways

    Directory of Open Access Journals (Sweden)

    Nico Bauer

    2017-02-01

    Full Text Available The data files contain the assumptions and results for the construction of cumulative availability curves for coal, oil and gas for the five Shared Socioeconomic Pathways. The files include the maximum availability (also known as cumulative extraction cost curves and the assumptions that are applied to construct the SSPs. The data is differentiated into twenty regions. The resulting cumulative availability curves are plotted and the aggregate data as well as cumulative availability curves are compared across SSPs. The methodology, the data sources and the assumptions are documented in a related article (N. Bauer, J. Hilaire, R.J. Brecha, J. Edmonds, K. Jiang, E. Kriegler, H.-H. Rogner, F. Sferra, 2016 [1] under DOI: http://dx.doi.org/10.1016/j.energy.2016.05.088.

  10. Organic matter and salinity modify cadmium soil (phyto)availability.

    Science.gov (United States)

    Filipović, Lana; Romić, Marija; Romić, Davor; Filipović, Vilim; Ondrašek, Gabrijel

    2018-01-01

    Although Cd availability depends on its total concentration in soil, it is ultimately defined by the processes which control its mobility, transformations and soil solution speciation. Cd mobility between different soil fractions can be significantly affected by certain pedovariables such as soil organic matter (SOM; over formation of metal-organic complexes) and/or soil salinity (over formation of metal-inorganic complexes). Phytoavailable Cd fraction may be described as the proportion of the available Cd in soil which is actually accessible by roots and available for plant uptake. Therefore, in a greenhouse pot experiment Cd availability was observed in the rhizosphere of faba bean exposed to different levels of SOM, NaCl salinity (50 and 100mM) and Cd contamination (5 and 10mgkg -1 ). Cd availability in soil does not linearly follow its total concentration. Still, increasing soil Cd concentration may lead to increased Cd phytoavailability if the proportion of Cd 2+ pool in soil solution is enhanced. Reduced Cd (phyto)availability by raised SOM was found, along with increased proportion of Cd-DOC complexes in soil solution. Data suggest decreased Cd soil (phyto)availability with the application of salts. NaCl salinity affected Cd speciation in soil solution by promoting the formation of CdCl n 2-n complexes. Results possibly suggest that increased Cd mobility in soil does not result in its increased availability if soil adsorption capacity for Cd has not been exceeded. Accordingly, chloro-complex possibly operated just as a Cd carrier between different soil fractions and resulted only in transfer between solid phases and not in increased (phyto)availability. Copyright © 2017 Elsevier Inc. All rights reserved.

  11. Availability of Supportive Facilities for Effective Teaching

    Directory of Open Access Journals (Sweden)

    Eugene Okyere-Kwakye

    2013-10-01

    Full Text Available Work environment of teachers has been identified by many researchers as one of the key propensity for quality teaching. Unlike the private schools, there has been a continues sentiments that, most government Junior High schools in Ghana do not performance satisfactorily during the Basic Education Certificate Examination (B.E.C.E. As majority of Ghanaian pupils’ school in this sector of education, hence this argument is wealthy of investigation. Therefore the purpose of this study is to identify the availability and the adequacy of certain necessary school facilities within the environment of Junior High Schools in the New Juaben Municipality, Eastern Region of Ghana. Questionnaire was used to collect data from two hundred (200 teachers who were selected from twenty (20 Junior High Schools in the New Juaben Municipality. The results reveal that facilities like furniture for pupil, urinal and toilet facilities and classroom blocks, were available but not adequate. However, computer laboratories, library books, staff common room and teachers’ accommodation were unavailable. Practical Implications of these results are been discussed.

  12. 22 CFR 212.31 - Availability of agency records.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Availability of agency records. 212.31 Section 212.31 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT PUBLIC INFORMATION Access to Agency... Federal Register pursuant to subpart B; (b) Matters made available to the public pursuant to subpart C...

  13. 7 CFR 611.21 - Availability of aerial photography.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Availability of aerial photography. 611.21 Section 611.21 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS SOIL SURVEYS Cartographic Operations § 611.21 Availability of aerial photography. The...

  14. Available states and available space: static properties that predict self-diffusivity of confined fluids

    International Nuclear Information System (INIS)

    Goel, Gaurav; Krekelberg, William P; Pond, Mark J; Truskett, Thomas M; Mittal, Jeetain; Shen, Vincent K; Errington, Jeffrey R

    2009-01-01

    Although classical density functional theory provides reliable predictions for the static properties of simple equilibrium fluids under confinement, a theory of comparative accuracy for the transport coefficients has yet to emerge. Nonetheless, there is evidence that knowledge of how confinement modifies static behavior can aid in forecasting dynamics. Specifically, recent molecular simulation studies have shown that the relationship between excess entropy and self-diffusivity of a bulk equilibrium fluid changes only modestly when the fluid is isothermally confined, indicating that knowledge of the former might allow semi-quantitative predictions of the latter. Do other static measures, such as those that characterize free or available volume, also strongly correlate with single-particle dynamics of confined fluids? Here, we investigate this question for both the single-component hard-sphere fluid and hard-sphere mixtures. Specifically, we use molecular simulations and fundamental measure theory to study these systems at approximately 10 3 equilibrium state points. We examine three different confining geometries (slit pore, square channel, and cylindrical pore) and the effects of particle packing fraction and particle–boundary interactions. Although average density fails to predict some key qualitative trends for the self-diffusivity of confined fluids, we provide strong empirical evidence that a new generalized measure of available volume for inhomogeneous fluids correlates excellently with self-diffusivity across a wide parameter space in these systems, approximately independently of the degree of confinement. An important consequence, which we demonstrate here, is that density functional theory predictions of this static property can be used together with knowledge of bulk fluid behavior to semi-quantitatively estimate the self-diffusion coefficient of confined fluids under equilibrium conditions

  15. Availability of lignocellulosic feedstocks for lactic acid production - Feedstock availability, lactic acid production potential and selection criteria

    NARCIS (Netherlands)

    Bakker, R.R.C.

    2013-01-01

    The overall objective of this study is to assess the worldwide availability and suitability of agricultural residues for lactic acid production, based on fermentation of carbohydrates. The study focuses on lignocellulosic biomass that is produced as a by-product of agricultural production. The

  16. 20 CFR 604.5 - Application-availability for work.

    Science.gov (United States)

    2010-04-01

    ... individual, the commuting distance from the individual's home to the job, the previous work history of the... actively seeking work to be considered available for work, or States may impose a separate requirement that... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Application-availability for work. 604.5...

  17. 15 CFR 0.735-38 - Availability for counseling.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Availability for counseling. 0.735-38... AND CONDUCT Administration § 0.735-38 Availability for counseling. (a) The General Counsel of the... part; and (3) Coordinate the counseling services provided under this part and assure that counseling...

  18. Water Resources Availability in Kabul, Afghanistan

    Science.gov (United States)

    Akbari, A. M.; Chornack, M. P.; Coplen, T. B.; Emerson, D. G.; Litke, D. W.; Mack, T. J.; Plummer, N.; Verdin, J. P.; Verstraeten, I. M.

    2008-12-01

    The availability of water resources is vital to the rebuilding of Kabul, Afghanistan. In recent years, droughts and increased water use for drinking water and agriculture have resulted in widespread drying of wells. Increasing numbers of returning refugees, rapid population growth, and potential climate change have led to heightened concerns for future water availability. The U.S. Geological Survey, with support from the U.S. Agency for International Development, began collaboration with the Afghanistan Geological Survey and Ministry of Energy and Water on water-resource investigations in the Kabul Basin in 2004. This has led to the compilation of historic and recent water- resources data, creation of monitoring networks, analyses of geologic, geophysical, and remotely sensed data. The study presented herein provides an assessment of ground-water availability through the use of multidisciplinary hydrogeologic data analysis. Data elements include population density, climate, snowpack, geology, mineralogy, surface water, ground water, water quality, isotopic information, and water use. Data were integrated through the use of conceptual ground-water-flow model analysis and provide information necessary to make improved water-resource planning and management decisions in the Kabul Basin. Ground water is currently obtained from a shallow, less than 100-m thick, highly productive aquifer. CFC, tritium, and stable hydrogen and oxygen isotopic analyses indicate that most water in the shallow aquifer appears to be recharged post 1970 by snowmelt-supplied river leakage and secondarily by late winter precipitation. Analyses indicate that increasing withdrawals are likely to result in declining water levels and may cause more than 50 percent of shallow supply wells to become dry or inoperative particularly in urbanized areas. The water quality in the shallow aquifer is deteriorated in urban areas by poor sanitation and water availability concerns may be compounded by poor well

  19. Phosphorus availability from different sources for sheep

    International Nuclear Information System (INIS)

    Vitti, D.M.S.S.; Abdalla, A.L.; Meirelles, C.F.

    1991-01-01

    An assay was carried out with 12 sheep to determine the endogenous losses of P and the true absorption of this element from rock phosphate (TP), diammonium phosphate (DP) and bone meal (BM). Animals received the experimental diet for 30 days and after this period 200μCi 32 P was injected in each one. Blood and faeces samples were collected to determine specific activity. Faecal endogenous P and P availability were estimated. P availability was 58.39, 69.71 and 75.03 per cent for TP, DP and BM, respectively. (author). 1 fig., 2 tabs., 9 refs

  20. Plant availability: the target for engineering training

    International Nuclear Information System (INIS)

    Buckley, W.J.; Rath, W.R.; Spitulnik, J.J.

    1986-01-01

    Nuclear plant managers and regulators have always assumed that in-depth operator training is essential to safe, reliable plant operations and, consequently, to high availability. In the aftermath of the reactor accident at Three Mile Island Unit 2, increased emphasis has been placed on systemizing operator training to assure these results are achieved. It can be argued that a systematic approach to engineering training will also have a positive impact on plant availability. In this paper, the authors present arguments to support that contention as well as a suggested approach to planning, documenting, and implementing an engineering training program

  1. Family based dispatching with batch availability

    NARCIS (Netherlands)

    van der Zee, D.J.

    2013-01-01

    Family based dispatching rules seek to lower set-up frequencies by grouping (batching) similar types of jobs for joint processing. Hence shop flow times may be improved, as less time is spent on set-ups. Motivated by an industrial project we study the control of machines with batch availability,

  2. 42 CFR 412.266 - Availability of wage data.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Availability of wage data. 412.266 Section 412.266... Review Board Composition and Procedures § 412.266 Availability of wage data. A hospital may obtain the average hourly wage data necessary to prepare its application to the MGCRB from Federal Register documents...

  3. 76 FR 28803 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2011...

    Science.gov (United States)

    2011-05-18

    ... these funds at least $5 million shall be made available for rural capacity building activities. Purpose...), the Local Initiatives Support Corporation (LISC), and Habitat for Humanity International. Specifically... Initiatives Support Corporation, 501 Seventh Avenue, 7th Floor, New York, NY 10018. Habitat for Humanity...

  4. 75 FR 61167 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Science.gov (United States)

    2010-10-04

    ... participating in HUD's Housing Counseling Program, including HUD-approved agencies, affiliates and branches of...: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010 Housing Counseling Training Program... requirements for HUD's Housing Counseling Training Program NOFA for FY2010. This year's Housing Counseling...

  5. Colonoscopy resource availability and colonoscopy utilization in Ontario, Canada

    Directory of Open Access Journals (Sweden)

    Colleen Webber

    2017-04-01

    The availability of colonoscopy resources improved in Ontario between 2007 and 2013. However, the geographic variation in resource availability and findings that higher colonoscopy resource availability is associated with higher colonoscopy utilization suggest that certain areas of the province may be under-resourced. These areas may be appropriate targets for efforts to improve colonoscopy capacity in Ontario.

  6. Demand and availability of chemical data for 'Project 90'

    International Nuclear Information System (INIS)

    Andersson, K.

    1987-01-01

    The safety analysis performed within 'Project 90' includes transport modeling for the near zone and geosphere by a probabilistic model as well as by the NAMSOL model. In a later stage a detailed geochemical modeling may also be performed within the project. For all these models, data are required. In this report the need for and availability of data of chemical nature is reviewed. For a non site-specific, probabilistic model, the necessary chemical data seem to be available. The main problem is to choose appropriate distributions of distribution coefficients (K d -values). For a site-specific modeling the choice of site will determine the data available. A large amount of data for the sites studied by SKB are available. However site specific data on the complex forming agents in groundwater are unavailable for some sites. Data for groundwater constituents and fission and activation products are available for a detailed geochemical model, except for complex forming constants for humic material in the groundwater. Thermodynamic data for actinides are available, although the amount and quality vary. For some engineering materials (cement, bentonite) available data do not allow a detailed geochemical modeling. The solubilities of the rock and minerals present are not as well known, although data do exist. If kinetic effects are to be considered the data are poorly known. The influence of colloid formation of the actinides has to be considered in some way in connection with the modeling. There is not enough data available on this topic. (author)

  7. A Preliminary Investigation into CNO Availability Schedule Overruns

    Science.gov (United States)

    2012-06-01

    days PHNSY Pearl Harbor Naval Shipyard and IMF PIA Planned Incremental Availability PIRA Pre-Inactivated Restricted Availability PNSY Portsmouth...DSRA 6 DEM 2 EOH 6 IA 2 PIA 3 MMP 1 ERO 3 SRA 1 PIRA 2 DMP 1 RCD 2 CM 1 DPIA 2 Table 23. High Level Work Stoppage Data Characteristics 1

  8. 7 CFR 611.22 - Availability of satellite imagery.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Availability of satellite imagery. 611.22 Section 611... § 611.22 Availability of satellite imagery. Cloud-free maps of the United States based on imagery received from a satellite are prepared and released to the pubic by NRCS. The maps offer the first image of...

  9. Dedicated memory structure holding data for detecting available worker thread(s) and informing available worker thread(s) of task(s) to execute

    Energy Technology Data Exchange (ETDEWEB)

    Chiu, George L.; Eichenberger, Alexandre E.; O' Brien, John K. P.

    2016-12-13

    The present disclosure relates generally to a dedicated memory structure (that is, hardware device) holding data for detecting available worker thread(s) and informing available worker thread(s) of task(s) to execute.

  10. Folate content and availability in Malaysian cooked foods.

    Science.gov (United States)

    Chew, S C; Khor, G L; Loh, S P

    2012-12-01

    Data on folate availability of Malaysian cooked foods would be useful for estimation of dietary folate intake; however such information is scarce. A total of 53 samples of frequently consumed foods in Malaysia were selected from the Nutrient Composition of Malaysian Foods. Folate content was determined using HPLC method hyphenated with a stainless steel C18 column and ultraviolet detector (lambda = 280 nm). The index of folate availability was defined as the proportion of folate identified as monoglutamyl derivatives from the total folate content. Total folate content of different food samples varied from 30-95 microg/100g fresh weight. Among rice-based dishes, the highest and the lowest total folate was in coconut milk rice (nasi lemak) and ghee rice (nasi minyak), respectively. In noodle dishes, fried rice noodle (kuey teow goreng) and curry noodle (mee kari) had the highest folate contents. The highest index of folate availability was in a flat rice noodle dish (kuey teow bandung) (12.13%), while the lowest was in a festival cake (kuih bakul) (0.13%). Folate content was found to be negatively related to its availability. This study determined folate content and folate availability in commonly consumed cooked foods in Malaysia. The uptake of folate from foods with high folate content may not be necessarily high as folate absorption also depends on the capacity of intestinal deconjugation and the presence of high fibre in the foods.

  11. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  12. 31 CFR 50.21 - Make available.

    Science.gov (United States)

    2010-07-01

    ... definition of act of terrorism. An insurer must make available coverage for insured losses in a policy of property and casualty insurance consistent with the definition of an act of terrorism as amended by the... possible following January 1, 2008. (ii) Not consistent with amended definition of act of terrorism. If an...

  13. 75 FR 33323 - Notice of Availability: Notice of HUD's Fiscal Year (FY) 2010 Notice of Funding Availability...

    Science.gov (United States)

    2010-06-11

    ... Fair Housing; (4) Capacity Building and Knowledge Sharing; (5) Using Housing as a Platform for Improving Other Outcomes; and (6) Expanding Cross-Cutting Policy Knowledge. Detailed information on HUD's Strategic Plan for FY2010-2015 is available at: http://portal.hud.gov/portal/page/portal/HUD/program_offices...

  14. Places disponibles/Places available

    CERN Multimedia

    2004-01-01

    Si vous désirez participer à l'un des cours suivants, veuillez en discuter avec votre superviseur et vous inscrire électroniquement en direct depuis les pages de description des cours dans le Web que vous trouvez à l'adresse : http://www.cern.ch/Training/ ou remplissez une « demande de formation » disponible auprès du Secrétariat de votre Division ou de votre DTO (Délégué divisionnaire à la formation). Les places seront attribuées dans l'ordre de réception des inscriptions. If you wish to participate in one of the following courses, please discuss with your supervisor and apply electronically directly from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an "application for training" form available from your Divisional Secretariat or from your DTO (Divisional Training Off...

  15. TICKETS ARE NOW AVAILABLE!

    CERN Multimedia

    2000-01-01

    Replay of the Rudra-Béjart Ballet for the CERN Staff on Tuesday 5 December 2000 at 8.00 pm sharp at the Geneva ARENA This private performance will be given for you. It will last longer than the original performance at CERN: 1 hour 20 instead of 35 minutes. I encourage you all to attend this performance-bring in great numbers yourselves, members of your family, and your friends. 2,020 places are available, for which tickets will be obtained from Monday 27 November at the Staff Association Secretariat, whom I sincerely thank for having kindly accepted to distribute the tickets. To regulate the distribution, a contribution of 5 francs will be asked for each ticket: this sum is symbolic, as I intend this ballet-representation foremost as a recognition by CERN of its gratitude to you. Luciano Maiani Director-General               Dancing,      &n...

  16. Technical training - Places available

    CERN Multimedia

    2012-01-01

    If you would like more information on a course, or for any other inquiry/suggestions, please contact Technical.Training@cern.ch Valeria Perez Reale, Learning Specialist, Technical Programme Coordinator (Tel.: 62424) Eva Stern and Elise Romero, Technical Training Administration (Tel.: 74924) HR Department Electronic Design Next Session Duration Language Availability Comprehensive VHDL for FPGA Design 08-Oct-12 to 12-Oct-12 5 days English 4 places Electrostatique / Protection ESD 28-Sep-12 to 28-Sep-12 3 hours French 25 places Impacts de la suppression du plomb (RoHS) en électronique 26-Oct-12 to 26-Oct-12 8 hours French 14 places Introduction to VHDL 10-Oct-12 to 11-Oct-12 2 days English 9 places LabVIEW Real Time and FPGA 13-Nov-12 to 16-Nov-12 5 days French 5 places LabVIEW for Experts 24-Sep-12 to 28-Sep-12 5 days English 6 places LabVIEW for beginners 15-Oct-12 to 17-...

  17. Food availability/convenience and obesity.

    Science.gov (United States)

    Gordon-Larsen, Penny

    2014-11-01

    Neighborhood environments have received considerable attention in recent local, state, and national obesity prevention initiatives, with a particular focus on food deserts, or areas with poor access to healthy foods. Yet, there are inconsistencies in the evidence base, suggesting a nuanced association between neighborhood environment, food availability, diet behaviors, and obesity. There is heterogeneity in associations between environmental exposures and health outcomes across race/ethnicity, gender, region, and urbanicity, which results in complexity in the interpretation of findings. There are several limitations in the literature, including a predominance of cross-sectional studies, reliance on commercial business listings, lack of attention to the process by which diet resources are established and expanded within neighborhoods and the potential for individuals to selectively migrate to locate near such facilities, a predominant focus on residential neighborhoods, and lack of information about the decision-making process underlying purchasing patterns. More research is needed to address the complexity of individual-level residential decision making as well as the purposeful placement of food environment resources across social and geographic space using longitudinal data and complex statistical approaches. In addition, improvements in data quality and depth related to food access and availability are needed, including behavioral data on purchase patterns and interactions with the food environment, and greater attention to heterogeneity across subpopulations. As policy changes to the food environment move forward, it is critical that there is rigorous and scientific evaluation of environmental changes and their impact on individual-level diet choices and behaviors, and their further influence on body weight. © 2014 American Society for Nutrition.

  18. Regional Responses to Constrained Water Availability

    Science.gov (United States)

    Cui, Y.; Calvin, K. V.; Hejazi, M. I.; Clarke, L.; Kim, S. H.; Patel, P.

    2017-12-01

    There have been many concerns about water as a constraint to agricultural production, electricity generation, and many other human activities in the coming decades. Nevertheless, how different countries/economies would respond to such constraints has not been explored. Here, we examine the responding mechanism of binding water availability constraints at the water basin level and across a wide range of socioeconomic, climate and energy technology scenarios. Specifically, we look at the change in water withdrawals between energy, land-use and other sectors within an integrated framework, by using the Global Change Assessment Model (GCAM) that also endogenizes water use and allocation decisions based on costs. We find that, when water is taken into account as part of the production decision-making, countries/basins in general fall into three different categories, depending on the change of water withdrawals and water re-allocation between sectors. First, water is not a constraining factor for most of the basins. Second, advancements in water-saving technologies of the electricity generation cooling systems are sufficient of reducing water withdrawals to meet binding water availability constraints, such as in China and the EU-15. Third, water-saving in the electricity sector alone is not sufficient and thus cannot make up the lowered water availability from the binding case; for example, many basins in Pakistan, Middle East and India have to largely reduce irrigated water withdrawals by either switching to rain-fed agriculture or reducing production. The dominant responding strategy for individual countries/basins is quite robust across the range of alternate scenarios that we test. The relative size of water withdrawals between energy and agriculture sectors is one of the most important factors that affect the dominant mechanism.

  19. 28 CFR 33.20 - Fund availability.

    Science.gov (United States)

    2010-07-01

    ... shall receive a base amount of $250,000 with the remaining funds allocated to each state on the basis of... subgranted by the state to state agencies and units of local government to carry out programs and projects... distributed to local units, the most recent and complete data available from the Bureau of Justice Statistics...

  20. Bone histomorphometry using free and commonly available software.

    Science.gov (United States)

    Egan, Kevin P; Brennan, Tracy A; Pignolo, Robert J

    2012-12-01

    Histomorphometric analysis is a widely used technique to assess changes in tissue structure and function. Commercially available programs that measure histomorphometric parameters can be cost-prohibitive. In this study, we compared an inexpensive method of histomorphometry to a current proprietary software program. Image J and Adobe Photoshop(®) were used to measure static and kinetic bone histomorphometric parameters. Photomicrographs of Goldner's trichrome-stained femurs were used to generate black-and-white image masks, representing bone and non-bone tissue, respectively, in Adobe Photoshop(®) . The masks were used to quantify histomorphometric parameters (bone volume, tissue volume, osteoid volume, mineralizing surface and interlabel width) in Image J. The resultant values obtained using Image J and the proprietary software were compared and differences found to be statistically non-significant. The wide-ranging use of histomorphometric analysis for assessing the basic morphology of tissue components makes it important to have affordable and accurate measurement options available for a diverse range of applications. Here we have developed and validated an approach to histomorphometry using commonly and freely available software that is comparable to a much more costly, commercially available software program. © 2012 Blackwell Publishing Limited.

  1. 75 FR 65503 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Continuum...

    Science.gov (United States)

    2010-10-25

    .... ACTION: Notice of technical correction. SUMMARY: On September 20, 2010, HUD posted on http://www.Grants.gov and http://www.hudhre.info its Notice of Funding Availability (NOFA) for HUD's FY2010 Continuum of... http://www.Grants.gov and http://www.hudhre.info a technical correction that corrects Appendix A of the...

  2. Auction-Based Cloud Service Pricing and Penalty with Availability on Demand

    Directory of Open Access Journals (Sweden)

    Xiaohong Wu

    2018-04-01

    Full Text Available Availability is one of the main concerns of cloud users, and cloud providers always try to provide higher availability to improve user satisfaction. However, higher availability results in higher provider costs and lower social welfare. In this paper, taking into account both the users’ valuation and desired availability, we design resource allocation, pricing and penalty mechanisms with availability on demand. Considering two scenarios: public availability in which the desired availabilities of all users are public information, and private availability in which the desired availabilities are private information of users, and, analyzing the possible behaviours of users, we design a truthful deterministic mechanism with 2-approximation in public availability scenario and a universal truthful mechanism with 1 1 + γ approximation in private availability scenario, where γ is the backup ratio of resources with the highest availability. The experiment results show that our mechanisms significantly improve the social welfare compared to the mechanism without considering availability demand of users.

  3. Maximum Available Accuracy of FM-CW Radars

    Directory of Open Access Journals (Sweden)

    V. Ricny

    2009-12-01

    Full Text Available This article deals with the principles and above all with the maximum available measuring accuracy analyse of FM-CW (Frequency Modulated Continuous Wave radars, which are usually employed for distance and velocity measurements of moving objects in road traffic, as well as air traffic and in other applications. These radars often form an important part of the active safety equipment of high-end cars – the so-called anticollision systems. They usually work in the frequency bands of mm waves (24, 35, 77 GHz. Function principles and analyses of factors, that dominantly influence the distance measurement accuracy of these equipments especially in the modulation and demodulation part, are shown in the paper.

  4. Study on melting available silicone from coal gangue

    Energy Technology Data Exchange (ETDEWEB)

    Chen-tao Hou; Sheng-quan Wang; Xiao-fei Xie [Xi' an University of Science and Technology, Xi' an (China). College of Geology and Environment

    2009-12-15

    Available silicone was melted from coal gangue samples from Hancheng diggings through calcination, digestion, and other means. The best calcination temperature was determined from a range of 550-1150{sup o}C; and the best time, from a range of 0.5-5 h by colorimetry method. The proper ratio of coal gangue, limestone, sodium carbonate, and caustic soda was then determined through orthogonal experiment. The results show that the proper extraction condition for available silicone is the ratio of coal gangue, limestone, sodium carbonate, and caustic soda at 1:0.5:0.1:0.05, calcination temperature at 700{sup o}C, and calcination time at 2 h. In this condition, the available silicone content can be more than 19.65%. 10 refs., 2 figs., 3 tabs.

  5. FEL radiation power available in electron storage rings

    International Nuclear Information System (INIS)

    Miyahara, Yoshikazu

    1994-01-01

    FEL radiation power available in electron storage rings was studied in the small signal regime in considering the increase of the energy spread of the electron beam caused by the FEL interaction and the decrease of the FEL gain with the increase of the energy spread in addition to the radiation damping and the quantum excitation. All these effects were considered separately, and combined with FEL power equations. The radiation power available was expressed explicitly with the parameters of the storage ring, the wiggler and the mirrors. The transient process of FEL lasing is simulated with the power equations. A rough estimation is made of the radiation power available by the FEL at different beam energies, and optimization of FEL parameters for a higher radiation power is discussed. ((orig.))

  6. Mapping a product-service-system delivering defence avionics availability

    OpenAIRE

    Settanni, E.; Thenent, N.; Newnes, L.; Parry, G.; Goh, Y. M.

    2017-01-01

    Long-term support agreements such as availability-based contracts are often associated with the servitization of business models in such sectors as defence aerospace. In practice, there is no unambiguous way of linking availability and service outcomes from an operational perspective; rather, the focus tends to be placed almost exclusively on product-related metrics. To address this gap, this paper outlines a conceptual model of how advanced service outcomes should be delivered under an avail...

  7. Quantifying Heuristic Bias: Anchoring, Availability, and Representativeness.

    Science.gov (United States)

    Richie, Megan; Josephson, S Andrew

    2018-01-01

    Construct: Authors examined whether a new vignette-based instrument could isolate and quantify heuristic bias. Heuristics are cognitive shortcuts that may introduce bias and contribute to error. There is no standardized instrument available to quantify heuristic bias in clinical decision making, limiting future study of educational interventions designed to improve calibration of medical decisions. This study presents validity data to support a vignette-based instrument quantifying bias due to the anchoring, availability, and representativeness heuristics. Participants completed questionnaires requiring assignment of probabilities to potential outcomes of medical and nonmedical scenarios. The instrument randomly presented scenarios in one of two versions: Version A, encouraging heuristic bias, and Version B, worded neutrally. The primary outcome was the difference in probability judgments for Version A versus Version B scenario options. Of 167 participants recruited, 139 enrolled. Participants assigned significantly higher mean probability values to Version A scenario options (M = 9.56, SD = 3.75) than Version B (M = 8.98, SD = 3.76), t(1801) = 3.27, p = .001. This result remained significant analyzing medical scenarios alone (Version A, M = 9.41, SD = 3.92; Version B, M = 8.86, SD = 4.09), t(1204) = 2.36, p = .02. Analyzing medical scenarios by heuristic revealed a significant difference between Version A and B for availability (Version A, M = 6.52, SD = 3.32; Version B, M = 5.52, SD = 3.05), t(404) = 3.04, p = .003, and representativeness (Version A, M = 11.45, SD = 3.12; Version B, M = 10.67, SD = 3.71), t(396) = 2.28, p = .02, but not anchoring. Stratifying by training level, students maintained a significant difference between Version A and B medical scenarios (Version A, M = 9.83, SD = 3.75; Version B, M = 9.00, SD = 3.98), t(465) = 2.29, p = .02, but not residents or attendings. Stratifying by heuristic and training level, availability maintained

  8. Hardware availability calculations and results of the IFMIF accelerator facility

    International Nuclear Information System (INIS)

    Bargalló, Enric; Arroyo, Jose Manuel; Abal, Javier; Beauvais, Pierre-Yves; Gobin, Raphael; Orsini, Fabienne; Weber, Moisés; Podadera, Ivan; Grespan, Francesco; Fagotti, Enrico; De Blas, Alfredo; Dies, Javier; Tapia, Carlos; Mollá, Joaquín; Ibarra, Ángel

    2014-01-01

    Highlights: • IFMIF accelerator facility hardware availability analyses methodology is described. • Results of the individual hardware availability analyses are shown for the reference design. • Accelerator design improvements are proposed for each system. • Availability results are evaluated and compared with the requirements. - Abstract: Hardware availability calculations have been done individually for each system of the deuteron accelerators of the International Fusion Materials Irradiation Facility (IFMIF). The principal goal of these analyses is to estimate the availability of the systems, compare it with the challenging IFMIF requirements and find new paths to improve availability performances. Major unavailability contributors are highlighted and possible design changes are proposed in order to achieve the hardware availability requirements established for each system. In this paper, such possible improvements are implemented in fault tree models and the availability results are evaluated. The parallel activity on the design and construction of the linear IFMIF prototype accelerator (LIPAc) provides detailed design information for the RAMI (reliability, availability, maintainability and inspectability) analyses and allows finding out the improvements that the final accelerator could have. Because of the R and D behavior of the LIPAc, RAMI improvements could be the major differences between the prototype and the IFMIF accelerator design

  9. Hardware availability calculations and results of the IFMIF accelerator facility

    Energy Technology Data Exchange (ETDEWEB)

    Bargalló, Enric, E-mail: enric.bargallo-font@upc.edu [Fusion Energy Engineering Laboratory (FEEL), Technical University of Catalonia (UPC), Barcelona (Spain); Arroyo, Jose Manuel [Laboratorio Nacional de Fusión por Confinamiento Magnético – CIEMAT, Madrid (Spain); Abal, Javier [Fusion Energy Engineering Laboratory (FEEL), Technical University of Catalonia (UPC), Barcelona (Spain); Beauvais, Pierre-Yves; Gobin, Raphael; Orsini, Fabienne [Commissariat à l’Energie Atomique, Saclay (France); Weber, Moisés; Podadera, Ivan [Laboratorio Nacional de Fusión por Confinamiento Magnético – CIEMAT, Madrid (Spain); Grespan, Francesco; Fagotti, Enrico [Istituto Nazionale di Fisica Nucleare, Legnaro (Italy); De Blas, Alfredo; Dies, Javier; Tapia, Carlos [Fusion Energy Engineering Laboratory (FEEL), Technical University of Catalonia (UPC), Barcelona (Spain); Mollá, Joaquín; Ibarra, Ángel [Laboratorio Nacional de Fusión por Confinamiento Magnético – CIEMAT, Madrid (Spain)

    2014-10-15

    Highlights: • IFMIF accelerator facility hardware availability analyses methodology is described. • Results of the individual hardware availability analyses are shown for the reference design. • Accelerator design improvements are proposed for each system. • Availability results are evaluated and compared with the requirements. - Abstract: Hardware availability calculations have been done individually for each system of the deuteron accelerators of the International Fusion Materials Irradiation Facility (IFMIF). The principal goal of these analyses is to estimate the availability of the systems, compare it with the challenging IFMIF requirements and find new paths to improve availability performances. Major unavailability contributors are highlighted and possible design changes are proposed in order to achieve the hardware availability requirements established for each system. In this paper, such possible improvements are implemented in fault tree models and the availability results are evaluated. The parallel activity on the design and construction of the linear IFMIF prototype accelerator (LIPAc) provides detailed design information for the RAMI (reliability, availability, maintainability and inspectability) analyses and allows finding out the improvements that the final accelerator could have. Because of the R and D behavior of the LIPAc, RAMI improvements could be the major differences between the prototype and the IFMIF accelerator design.

  10. Availability analysis of United States BWR IV electrical generation plants

    International Nuclear Information System (INIS)

    Renick, D.H.; Li, F.; Todreas, N.E.

    1998-01-01

    Availability, as quantified by power output levels, from all active U.S. BWR IV plants were analyzed over a seven and a half year period to determine the operational characteristics of these plants throughout an operating cycle. The operational data were examined for infant mortality, end of cycle decreased availability, and seasonal availability variations. Scheduled outages were also examined to determine the industry's current approach to planning maintenance outages. The results of this study show that nuclear power plants do suffer significant infant mortality following a refueling outage. And while they do not suffer an end of cycle decrease in availability, a mid-cycle period of decreased availability is evident. This period of decreased availability is due to a combination of increased forced unavailability and seasonally scheduled maintenance and refueling outages. These findings form the start of a rational approach to increasing plant availability. (author)

  11. VT DSL Broadband Availability by Census Block - 06-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201006 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2010. This...

  12. VT Wireless Broadband Availability by Census Block - 06-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201106 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2011. This...

  13. VT Wireline Broadband Availability by Census Block - 06-2013

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201306 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2013. This...

  14. VT Cable Broadband Availability by Census Block - 06-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201006 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2010. This...

  15. VT Total Broadband Availability by Census Block - 12-2012

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201212 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2012. This...

  16. VT Cable Broadband Availability by Census Block - 12-2012

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201212 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2012. This...

  17. VT Detailed Broadband Availability by Census Block -12-2012

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201212 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2012. This...

  18. VT Detailed Broadband Availability by Census Block - 06-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201006 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2010. This...

  19. VT Detailed Broadband Availability by Census Block -12-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201112 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2011. This...

  20. VT Detailed Broadband Availability by Census Block - 06-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201106 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2011. This...

  1. VT Wireline Broadband Availability by Census Block - 12-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201012 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2010. This...

  2. VT Wireless Broadband Availability by Census Block - 06-2013

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201306 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2013. This...

  3. VT Total Broadband Availability by Census Block - 06-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201006 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2010. This...

  4. VT Wireline Broadband Availability by Census Block - 06-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201006 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2010. This...

  5. VT Wireless Broadband Availability by Census Block - 12-2012

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201212 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2012. This...

  6. VT Total Broadband Availability by Census Block - 12-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201112 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2011. This...

  7. VT Cable Broadband Availability by Census Block - 12-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201012 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2010. This...

  8. VT Wireless Broadband Availability by Census Block - 06-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201006 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2010. This...

  9. VT Detailed Broadband Availability by Census Block - 12-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201012 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2010. This...

  10. VT Total Broadband Availability by Census Block - 06-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201106 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2011. This...

  11. VT DSL Broadband Availability by Census Block - 06-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201106 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2011. This...

  12. VT Wireline Broadband Availability by Census Block - 12-2012

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201212 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2012. This...

  13. VT Wireless Broadband Availability by Census Block - 12-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201012 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2010. This...

  14. VT DSL Broadband Availability by Census Block - 06-2013

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201306 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2013. This...

  15. VT Cable Broadband Availability by Census Block - 06-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201106 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2011. This...

  16. VT Wireline Broadband Availability by Census Block - 12-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201112 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2011. This...

  17. VT Cable Broadband Availability by Census Block - 06-2013

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201306 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2013. This...

  18. VT Wireless Broadband Availability by Census Block - 12-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201112 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2011. This...

  19. VT DSL Broadband Availability by Census Block - 12-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201112 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2011. This...

  20. VT Wireline Broadband Availability by Census Block - 06-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201106 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2011. This...

  1. VT Cable Broadband Availability by Census Block - 12-2011

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201112 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2011. This...

  2. VT Total Broadband Availability by Census Block - 12-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201012 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2010. This...

  3. VT Detailed Broadband Availability by Census Block - 06-2013

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201306 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2013. This...

  4. VT DSL Broadband Availability by Census Block - 12-2012

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201212 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2012. This...

  5. VT DSL Broadband Availability by Census Block - 12-2010

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201012 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 12/31/2010. This...

  6. VT Total Broadband Availability by Census Block - 06-2013

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The VTBB201306 VT Broadband Availability Dataset represents wireline and wireless 'broadband service' availability in VT as of 6/30/2013. This...

  7. Availability of native and added phosphates for the soil

    International Nuclear Information System (INIS)

    Scivittaro, W.B.; Boaretto, A.E.; Muraoka, T.

    1995-01-01

    In superficial composite samples of two Red-Yellow Latosols with different physical and chemical properties, analyses were carried out on inorganic form of phosphorus as well as the availability of native and added phosphates. The method applied was soil phosphorus fractionation associated with isotopic dilution technique ( 32 P). The samples were taken from pots containing soils incubated for a month with fluid phosphatic fertilizers (phosphoric acid and 10-30-00 suspension) and solid phosphatic fertilizers (mono ammonium phosphate and triple superphosphate), at the rate of 210 mg P 2 O 5 /kg of soil. A control treatment was included. In both soils the availability of inorganic phosphorus fractions decreased at the following order: H 2 O-P > Al-P > Fe-P > CA-P > occluded-P. The water soluble and aluminium phosphates represented the main source of available P for the newly fertilizer, the iron phosphates were also an important source of available phosphorus. The soil phosphorus fixing capacity influenced the availability of native and added phosphates. (author). 17 refs, 3 tabs

  8. Uranium as a nuclear fuel: availability, economy, sustainability

    International Nuclear Information System (INIS)

    2010-01-01

    In the context of the much cited nuclear renaissance, the presence of the resource uranium not only raises questions about availability, but also places the central demand for sustainability in the limelight. Consideration of economic and environmental aspects of uranium production, e.g. through mining, provides the basis for a possible assessment of this resource. In addition to the crucial question of resource availability, this conference will also discuss its economic aspects and environmental risks.

  9. The Universality of Semantic Prototypes in Spanish Lexical Availability

    Directory of Open Access Journals (Sweden)

    Marjana Šifrar Kalan

    2016-12-01

    Full Text Available The article presents the words with highest index of availability on the basis of semantic fluency tests. The conceptual stability of highly available words in various semantic categories enables them to be classified as semantic prototypes according to the theory of prototype. The aim of this article is to compare the semantic prototypes in nine semantic categories from different lexical availability studies: those carried out in Spanish as a mother tongue and Spanish as a foreign language (with Slovene, Finnish, Turkish, Chinese students and students of various other mother tongues who studied Spanish in Madrid and Salamanca. The informants who come from different countries and cultures and speak different first languages demonstrate that human beings share the same or similar categorization and universality of semantic prototypes.

  10. Listing of Available ACE Data Tables

    Energy Technology Data Exchange (ETDEWEB)

    Conlin, Jeremy Lloyd [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-01-31

    This document is divided into multiple sections. Section 2 lists some of the more frequently used ENDF/B reaction types that can be used with the FM input card. The remaining sections (described below) contain tables showing the available ACE data tables for various types of data. These ACE data libraries are distributed by the Radiation Safety Information Computational Center (RSICC) with MCNP6.

  11. Availability of thermal power plants 1980-1989

    International Nuclear Information System (INIS)

    Nitsch, D.; Schmitz, H.

    1990-01-01

    The evaluation submitted here is the 19th annual evaluation since 1970. It covers the period from 1980 to 1989 and contains availability data of 324 power stations (domestic and international) with roundabout 94000 MW and 3800 plant years. Data relate to fossil-fuelled cogeneration plants, combined cycle plants (gas-steam combined process), nuclear power stations and gas turbines. The fossil-fuelled blocks are broken down by size, time of operation, fuel, type of combustion (dry, melt) and type mono-, duoblocks, subcritical and supercritical systems, nuclear power stations are organised by type of reactor heavy-water/pressurized water reactor and type of operation. Combined cycle power plants are listed separately due to their different technical concept. Gas turbines are sub-divided by type of operation (time). Apart from availability and utilisation values of gas turbines there are data on reliability and the number of successful and unsuccessful starts. In general the values are first given for all plants of one particular type and then for the German plants in particular. Performance values are gross values measured at generator and like the number of plants they are end-of-the-year figures. In order to increase the usefulness of the VGB-availability studies various items in the recording and evaluation were improved and extended as of 1987. (orig./HS) [de

  12. The application of availability analysis to nuclear power plants

    International Nuclear Information System (INIS)

    Brooks, A.C.

    1984-01-01

    The use of probabilistic risk analysis (PRA) to assess the risks from nuclear power plants is now well established. Considerably less attention has been given so far to the use of availability analysis techniques. The economics of power generation are now such that with nuclear power currently supplying a substantial fraction of power in many countries, increasing attention is being paid to improving plant availability. This paper presents a technique for systematically identifying the areas in which measures to improve plant availability will be most effective. (author)

  13. 7 CFR 3403.11 - Availability of information.

    Science.gov (United States)

    2010-01-01

    ... Submission and Evaluation of Proposals § 3403.11 Availability of information. Information regarding the peer....C. 552), the Privacy Act (5 U.S.C. 552a), the SBIR Policy Directive, and implementing Departmental...

  14. Availability of residual nitrogen from fertilizers in soil

    International Nuclear Information System (INIS)

    Jakovljevic, M.; Filipovic, R.; Petrovic, M.

    1983-01-01

    The plant availability of residual fertilizer nitrogen for the next crop was studied in chernozem and pseudogley soils. Release of nitrogen was examined after incubation at 3 and 30 0 C. It was found that the use of increased doses of nitrogen fertilizer (ammonium nitrate) led to an increased release of residual fertilizer nitrogen into plant available forms. The release of this nitrogen fraction was 5-10 times faster in comparison with the remaining soil nitrogen. (author)

  15. Availability of residual nitrogen from fertilizers in soil

    Energy Technology Data Exchange (ETDEWEB)

    Jakovljevic, M.; Filipovic, R.; Petrovic, M. (Institut za Primeni Nuklearne Energije u Poljoprivedri, Veterinarstvu i Sumarstvu, Zemun (Yugoslavia))

    1983-05-01

    The plant availability of residual fertilizer nitrogen for the next crop was studied in chernozem and pseudogley soils. Release of nitrogen was examined after incubation at 3 and 30/sup 0/C. It was found that the use of increased doses of nitrogen fertilizer (ammonium nitrate) led to an increased release of residual fertilizer nitrogen into plant available forms. The release of this nitrogen fraction was 5-10 times faster in comparison with the remaining soil nitrogen.

  16. Nationwide water availability data for energy-water modeling

    Energy Technology Data Exchange (ETDEWEB)

    Tidwell, Vincent Carroll [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Zemlick, Katie M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2013-11-01

    The purpose of this effort is to explore where the availability of water could be a limiting factor in the siting of new electric power generation. To support this analysis, water availability is mapped at the county level for the conterminous United States (3109 counties). Five water sources are individually considered, including unappropriated surface water, unappropriated groundwater, appropriated water (western U.S. only), municipal wastewater and brackish groundwater. Also mapped is projected growth in non-thermoelectric consumptive water demand to 2035. Finally, the water availability metrics are accompanied by estimated costs associated with utilizing that particular supply of water. Ultimately these data sets are being developed for use in the National Renewable Energy Laboratories' (NREL) Regional Energy Deployment System (ReEDS) model, designed to investigate the likely deployment of new energy installations in the U.S., subject to a number of constraints, particularly water.

  17. 78 FR 27233 - Clean Water Act: Availability of List Decisions

    Science.gov (United States)

    2013-05-09

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9811-4] Clean Water Act: Availability of List Decisions AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the availability of EPA's action identifying water quality limited segments and associated...

  18. Predicting and mapping soil available water capacity in Korea

    Directory of Open Access Journals (Sweden)

    Suk Young Hong

    2013-04-01

    Full Text Available The knowledge on the spatial distribution of soil available water capacity at a regional or national extent is essential, as soil water capacity is a component of the water and energy balances in the terrestrial ecosystem. It controls the evapotranspiration rate, and has a major impact on climate. This paper demonstrates a protocol for mapping soil available water capacity in South Korea at a fine scale using data available from surveys. The procedures combined digital soil mapping technology with the available soil map of 1:25,000. We used the modal profile data from the Taxonomical Classification of Korean Soils. The data consist of profile description along with physical and chemical analysis for the modal profiles of the 380 soil series. However not all soil samples have measured bulk density and water content at −10 and −1500 kPa. Thus they need to be predicted using pedotransfer functions. Furthermore, water content at −10 kPa was measured using ground samples. Thus a correction factor is derived to take into account the effect of bulk density. Results showed that Andisols has the highest mean water storage capacity, followed by Entisols and Inceptisols which have loamy texture. The lowest water retention is Entisols which are dominated by sandy materials. Profile available water capacity to a depth of 1 m was calculated and mapped for Korea. The western part of the country shows higher available water capacity than the eastern part which is mountainous and has shallower soils. The highest water storage capacity soils are the Ultisols and Alfisols (mean of 206 and 205 mm, respectively. Validation of the maps showed promising results. The map produced can be used as an indication of soil physical quality of Korean soils.

  19. 77 FR 15368 - Clean Water Act; Availability of List Decisions

    Science.gov (United States)

    2012-03-15

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9646-9] Clean Water Act; Availability of List Decisions AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of Availability and Request for Public Comment. SUMMARY: This action announces the availability of the Environmental Protection Agency's (EPA...

  20. Integrated outages increase Surry's availability

    International Nuclear Information System (INIS)

    Harms, S.R.; Downs, J.L.

    1995-01-01

    This article describes how, through Virginia Power's and Westinghouse's goal-oriented planning philosophy, teamwork and commitment, average outage duration has decreased significantly. During the past 10 years Virginia Power and its nuclear steam supply system (NSSS) services vendor, Westinghouse Electric Corp., have developed a working partnership with one goal in mind: increasing the availability and capacity factors of the North Anna and Surry nuclear power stations while driving down the operating costs of the plants. The outage integration program, steam generator maintenance agreement (SGMA), and integrated radiological services program form the core of this relationship and helped Virginia Power complete one of the most successful outages in Surry Power Station's operating history

  1. Review of available power sources

    International Nuclear Information System (INIS)

    Beard, Carl

    2006-01-01

    Klystrons and triodes have been the accepted choice for particle accelerators because they produce high power RF and offer high gain (60 dB) with efficiencies of ∼50%. Although fairly new to the market, inductive output tubes (IOTs) have become available at L-band frequencies and have maintained their high efficiency. The development of superconducting RF at the L-band frequency allows IOTs to become the choice for future accelerator programs. Due to the operational nature of SRF technology in energy recovery mode, there is no longer the requirement for large amounts of RF power from single sources. This report reviews some of the developments in RF power sources suitable for energy recovery linacs (ERLs)

  2. 78 FR 45925 - Clean Water Act: Availability of List Decisions

    Science.gov (United States)

    2013-07-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9840-5] Clean Water Act: Availability of List Decisions AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the availability of EPA's Responsiveness Summary Concerning EPA's May 9, 2013 Public Notice of...

  3. Management and Communication courses – Places available

    CERN Multimedia

    2015-01-01

    Please note that there are some places available in the following Management and Communication courses.   For more information on the course, go to the Training Catalogue. You can then sign-up on line.  

  4. Evaluation of potential effects of soil available phosphorus on soil arsenic availability and paddy rice inorganic arsenic content.

    Science.gov (United States)

    Jiang, Wei; Hou, Qingye; Yang, Zhongfang; Zhong, Cong; Zheng, Guodong; Yang, Zhiqiang; Li, Jie

    2014-05-01

    The transfer of arsenic from paddy field to rice is a major exposure route of the highly toxic element to humans. The aim of our study is to explore the effects of soil available phosphorus on As uptake by rice, and identify the effects of soil properties on arsenic transfer from soil to rice under actual field conditions. 56 pairs of topsoil and rice samples were collected. The relevant parameters in soil and the inorganic arsenic in rice grains were analyzed, and then all the results were treated by statistical methods. Results show that the main factors influencing the uptake by rice grain include soil pH and available phosphorus. The eventual impact of phosphorus is identified as the suppression of As uptake by rice grains. The competition for transporters from soil to roots between arsenic and phosphorus in rhizosphere soil has been a dominant feature. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. County-Scale Spatial Variability of Macronutrient Availability Ratios in Paddy Soils

    Directory of Open Access Journals (Sweden)

    Mingkai Qu

    2014-01-01

    Full Text Available Macronutrients (N, P, and K are essential to plants but also can be harmful to the environment when their available concentrations in soil are excessive. Availability ratios (available concentration/total concentration of macronutrients may reflect their transforming potential between fixed and available forms in soil. Understanding their spatial distributions and impact factors can be, therefore, helpful to applying specific measures to modify the availability of macronutrients for agricultural and environmental management purposes. In this study, 636 topsoil samples (0–15 cm were collected from paddy fields in Shayang County, Central China, for measuring soil properties. Factors influencing macronutrient availability ratios were investigated, and total and available concentrations of macronutrients were mapped using geostatistical method. Spatial distribution maps of macronutrient availability ratios were further derived. Results show that (1 availability of macronutrients is controlled by multiple factors, and (2 macronutrient availability ratios are spatially varied and may not always have spatial patterns identical to those of their corresponding total and available concentrations. These results are more useful than traditional soil macronutrient average content data for guiding site-specific field management for agricultural production and environmental protection.

  6. 5 CFR 250.303 - Availability of results.

    Science.gov (United States)

    2010-01-01

    ... results of its annual survey available to the public and post the results on its Web site, unless the... days after the agency completes survey administration. OPM may extend this date under unusual... completes survey administration. ...

  7. 78 FR 71625 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2013-11-29

    ... available. In vivo data available (animal). Inventors: Dimiter S. Dimitrov (NCI), Zhu Zhongyu (NCI), Pradman... . Collaborative Research Opportunity: The National Cancer Institute, Laboratory of Human Carcinogenesis, is... studies are of great importance for future pre-clinical and clinical studies of MJC13. Potential...

  8. A2THOS : availability analysis and optimisation in SLAs

    NARCIS (Netherlands)

    Zambon, E.; Etalle, S.; Wieringa, R.J.

    2010-01-01

    IT service availability is at the core of customer satisfaction and business success for today’s organisations. Many medium-large size organisations outsource part of their IT services to external providers, with Service Level Agreements describing the agreed availability of outsourced service

  9. A2THOS: Availability Analysis and Optimisation in SLAs

    NARCIS (Netherlands)

    Zambon, Emmanuele; Etalle, Sandro; Wieringa, Roelf J.

    2010-01-01

    IT service availability is at the core of customer satisfaction and business success for today’s organisations. Many medium-large size organisations outsource part of their IT services to external providers, with Service Level Agreements describing the agreed availability of outsourced service

  10. 45 CFR 149.315 - Reimbursement conditioned upon available funds.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Reimbursement conditioned upon available funds... TO HEALTH CARE ACCESS REQUIREMENTS FOR THE EARLY RETIREE REINSURANCE PROGRAM Reimbursement Methods § 149.315 Reimbursement conditioned upon available funds. Notwithstanding a sponsor's compliance with...

  11. Operational Issues: What Science in Available?

    Science.gov (United States)

    Rosekind, Mark R.; Neri, David F.

    1997-01-01

    Flight/duty/rest considerations involve two highly complex factors: the diverse demands of aviation operations and human physiology (especially sleep and circadian rhythms). Several core operational issues related to fatigue have been identified, such as minimum rest requirements, duty length, flight time considerations, crossing multiple time zones, and night flying. Operations also can involve on-call reserve status and callout, delays due to unforeseen circumstances (e.g., weather, mechanical), and on-demand flights. Over 40 years of scientific research is now available to apply to these complex issues of flight/duty/rest requirements. This research involves controlled 'laboratory studies, simulations, and data collected during regular flight operations. When flight/duty/rest requirements are determined they are typically based on a variety of considerations, such as operational demand, safety, economic, etc. Rarely has the available, state-of-the-art science been a consideration along with these other factors when determining flight/duty/rest requirements. While the complexity of the operational demand and human physiology precludes an absolute solution, there is an opportunity to take full advantage of the current scientific data. Incorporating these data in a rational operational manner into flight/duty/rest requirements can improve flight crew performance, alertness, and ultimately, aviation safety.

  12. Altered serotonin transporter availability in patients with multiple sclerosis

    International Nuclear Information System (INIS)

    Hesse, Swen; Sabri, Osama; Moeller, Franziska; Thomae, Eva; Then Bergh, Florian; Petroff, David; Lobsien, Donald; Luthardt, Julia; Becker, Georg-Alexander; Patt, Marianne; Seese, Anita; Meyer, Philipp M.; Regenthal, Ralf

    2014-01-01

    Modulation of the immune system by the CNS may involve serotonergic regulation via the brain serotonin transporters (SERT). This regulation may be disturbed in patients with CNS disorders including multiple sclerosis (MS). Central serotonergic mechanisms have not been investigated in MS by in vivo imaging. The objective of the study was to assess the availability of SERT in antidepressant-naive patients with MS by means of PET. Included in this study were 23 patients with MS and 22 matched healthy volunteers who were investigated with PET and the SERT-selective marker [ 11 C]DASB, and distribution volume ratios were determined. Clinical assessment of the patients included the expanded disability status scale, the MS fatigue scale Wuerzburger Erschoepfungsinventar bei MS (WEIMuS) and the Beck Depression Inventory (BDI). The PET data were analysed with both volume-of-interest and voxel-based analyses to determine regional SERT availability. Patients had lower SERT availability in the cingulate cortex, the thalamus and the insula, and increased availability in the orbitofrontal cortex. Patients with relapsing/remitting MS tended to have lower SERT in the hippocampus, whereas patients with primary progressive disease showed increased SERT availability in prefrontal regions. There was a positive correlation between SERT availability in the insula and both depression and fatigue scores (r = 0.56 vs. BDI, p = 0.02; r = 0.49 vs. WEIMuS, p = 0.05). Serotonergic neurotransmission in MS patients is altered in limbic and paralimbic regions as well as in the frontal cortex that this appears to contribute to psychiatric symptoms of MS. (orig.)

  13. Altered serotonin transporter availability in patients with multiple sclerosis

    Energy Technology Data Exchange (ETDEWEB)

    Hesse, Swen; Sabri, Osama [University of Leipzig, Department of Nuclear Medicine, Leipzig (Germany); Integrated Research and Treatment Center (IFB) Adiposity Diseases, University of Leipzig, Leipzig (Germany); Moeller, Franziska; Thomae, Eva; Then Bergh, Florian [University of Leipzig, Department of Neurology, Leipzig (Germany); Petroff, David [University of Leipzig, Coordinating Centre for Clinical Studies, Leipzig (Germany); Lobsien, Donald [University of Leipzig, Department of Neuroradiology, Leipzig (Germany); Luthardt, Julia; Becker, Georg-Alexander; Patt, Marianne; Seese, Anita; Meyer, Philipp M. [University of Leipzig, Department of Nuclear Medicine, Leipzig (Germany); Regenthal, Ralf [University of Leipzig, Clinical Pharmacology, Rudolf-Boehm-Institute of Pharmacology and Toxicology, Leipzig (Germany)

    2014-05-15

    Modulation of the immune system by the CNS may involve serotonergic regulation via the brain serotonin transporters (SERT). This regulation may be disturbed in patients with CNS disorders including multiple sclerosis (MS). Central serotonergic mechanisms have not been investigated in MS by in vivo imaging. The objective of the study was to assess the availability of SERT in antidepressant-naive patients with MS by means of PET. Included in this study were 23 patients with MS and 22 matched healthy volunteers who were investigated with PET and the SERT-selective marker [{sup 11}C]DASB, and distribution volume ratios were determined. Clinical assessment of the patients included the expanded disability status scale, the MS fatigue scale Wuerzburger Erschoepfungsinventar bei MS (WEIMuS) and the Beck Depression Inventory (BDI). The PET data were analysed with both volume-of-interest and voxel-based analyses to determine regional SERT availability. Patients had lower SERT availability in the cingulate cortex, the thalamus and the insula, and increased availability in the orbitofrontal cortex. Patients with relapsing/remitting MS tended to have lower SERT in the hippocampus, whereas patients with primary progressive disease showed increased SERT availability in prefrontal regions. There was a positive correlation between SERT availability in the insula and both depression and fatigue scores (r = 0.56 vs. BDI, p = 0.02; r = 0.49 vs. WEIMuS, p = 0.05). Serotonergic neurotransmission in MS patients is altered in limbic and paralimbic regions as well as in the frontal cortex that this appears to contribute to psychiatric symptoms of MS. (orig.)

  14. 77 FR 18833 - Government-Owned Inventions; Availability for Licensing

    Science.gov (United States)

    2012-03-28

    ... for microbial analytes identification via spectral pattern recognition. The device design includes a... cellular protein necessary for HCV replication and not the virus itself, the emergence of viral resistance.... In vitro data available. In vivo data available (animal). Inventors: Yves G. Pommier, Robert H...

  15. Design for availability : creating value for manufacturers and customers

    NARCIS (Netherlands)

    Smets, L.P.M.; Houtum, van G.J.J.A.N.; Langerak, F.

    2010-01-01

    This research introduces a newly developed continuous improvement methodology called Design for Availability that uses principles of Lean Sigma and Design for X to cost-effectively optimize the availability of capital goods, i.e. systems used in the production of other end-products or -services,

  16. Availability Issues in Wireless Visual Sensor Networks

    Science.gov (United States)

    Costa, Daniel G.; Silva, Ivanovitch; Guedes, Luiz Affonso; Vasques, Francisco; Portugal, Paulo

    2014-01-01

    Wireless visual sensor networks have been considered for a large set of monitoring applications related with surveillance, tracking and multipurpose visual monitoring. When sensors are deployed over a monitored field, permanent faults may happen during the network lifetime, reducing the monitoring quality or rendering parts or the entire network unavailable. In a different way from scalar sensor networks, camera-enabled sensors collect information following a directional sensing model, which changes the notions of vicinity and redundancy. Moreover, visual source nodes may have different relevancies for the applications, according to the monitoring requirements and cameras' poses. In this paper we discuss the most relevant availability issues related to wireless visual sensor networks, addressing availability evaluation and enhancement. Such discussions are valuable when designing, deploying and managing wireless visual sensor networks, bringing significant contributions to these networks. PMID:24526301

  17. Downgrading recent estimates of land available for biofuel production.

    Science.gov (United States)

    Fritz, Steffen; See, Linda; van der Velde, Marijn; Nalepa, Rachel A; Perger, Christoph; Schill, Christian; McCallum, Ian; Schepaschenko, Dmitry; Kraxner, Florian; Cai, Ximing; Zhang, Xiao; Ortner, Simone; Hazarika, Rubul; Cipriani, Anna; Di Bella, Carlos; Rabia, Ahmed H; Garcia, Alfredo; Vakolyuk, Mar'yana; Singha, Kuleswar; Beget, Maria E; Erasmi, Stefan; Albrecht, Franziska; Shaw, Brian; Obersteiner, Michael

    2013-02-05

    Recent estimates of additional land available for bioenergy production range from 320 to 1411 million ha. These estimates were generated from four scenarios regarding the types of land suitable for bioenergy production using coarse-resolution inputs of soil productivity, slope, climate, and land cover. In this paper, these maps of land availability were assessed using high-resolution satellite imagery. Samples from these maps were selected and crowdsourcing of Google Earth images was used to determine the type of land cover and the degree of human impact. Based on this sample, a set of rules was formulated to downward adjust the original estimates for each of the four scenarios that were previously used to generate the maps of land availability for bioenergy production. The adjusted land availability estimates range from 56 to 1035 million ha depending upon the scenario and the ruleset used when the sample is corrected for bias. Large forest areas not intended for biofuel production purposes were present in all scenarios. However, these numbers should not be considered as definitive estimates but should be used to highlight the uncertainty in attempting to quantify land availability for biofuel production when using coarse-resolution inputs with implications for further policy development.

  18. Water and land availability for energy farming. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Schooley, F.A.; Mara, S.J.; Mendel, D.A.; Meagher, P.C.; So, E.C.

    1979-10-01

    The physical and economic availability of land and water resources for energy farming were determined. Ten water subbasins possessing favorable land and water availabilities were ranked according to their overall potential for biomass production. The study results clearly identify the Southeast as a favorable area for biomass farming. The Northwest and North-Central United States should also be considered on the basis of their highly favorable environmental characteristics. Both high and low estimates of water availability for 1985 and 2000 in each of 99 subbasins were prepared. Subbasins in which surface water consumption was more than 50% of surface water supply were eliminated from the land availability analysis, leaving 71 subbasins to be examined. The amount of acreage potentially available for biomass production in these subbasins was determined through a comparison of estimated average annual net returns developed for conventional agriculture and forestry with net returns for several biomass production options. In addition to a computerized method of ranking subbasins according to their overall potential for biomass production, a methodology for evaluating future energy farm locations was developed. This methodology included a general area selection procedure as well as specific site analysis recommendations. Thirty-five general factors and a five-step site-specific analysis procedure are described.

  19. Grammatical typology and frequency analysis: number availability and number use

    Directory of Open Access Journals (Sweden)

    Dunstan Brown

    2013-12-01

    Full Text Available The Smith-Stark hierarchy, a version of the Animacy Hierarchy, offers a typology of the cross-linguistic availability of number. The hierarchy predicts that the availability of number is not arbitrary. For any language, if the expression of plural is available to a noun, it is available to any noun of a semantic category further to the left of the hierarchy. In this article we move one step further by showing that the structure of the hierarchy can be observed in a statistical model of number use in Russian. We also investigate three co-variates: plural preference, pluralia tantum and irregularity effects; these account for an item's behaviour being different than that solely expected from its animacy position.

  20. School wellness policies and foods and beverages available in schools.

    Science.gov (United States)

    Hood, Nancy E; Colabianchi, Natalie; Terry-McElrath, Yvonne M; O'Malley, Patrick M; Johnston, Lloyd D

    2013-08-01

    Since 2006-2007, education agencies (e.g., school districts) participating in U.S. federal meal programs are required to have wellness policies. To date, this is the only federal policy that addresses foods and beverages sold outside of school meals (in competitive venues). To examine the extent to which federally required components of school wellness policies are associated with availability of foods and beverages in competitive venues. Questionnaire data were collected in 2007-2008 through 2010-2011 school years from 892 middle and 1019 high schools in nationally representative samples. School administrators reported the extent to which schools had required wellness policy components (goals, nutrition guidelines, implementation plan/person responsible, stakeholder involvement) and healthier and less-healthy foods and beverages available in competitive venues. Analyses were conducted in 2012. About one third of students (31.8%) were in schools with all four wellness policy components. Predominantly white schools had higher wellness policy scores than other schools. After controlling for school characteristics, higher wellness policy scores were associated with higher availability of low-fat and whole-grain foods and lower availability of regular-fat/sugared foods in middle and high schools. In middle schools, higher scores also were associated with lower availability of 2%/whole milk. High schools with higher scores also had lower sugar-sweetened beverage availability and higher availability of 1%/nonfat milk, fruits/vegetables, and salad bars. Because they are associated with lower availability of less-healthy and higher availability of healthier foods and beverages in competitive venues, federally required components of school wellness policies should be encouraged in all schools. Copyright © 2013 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  1. Carbohydrate availability of arroz caldo with lambda-carrageenan.

    Science.gov (United States)

    Dumelod, B D; Ramirez, R P; Tiangson, C L; Barrios, E B; Panlasigui, L N

    1999-07-01

    Total available carbohydrate (sugars and starches) and total dietary fiber (soluble and insoluble) make up the total carbohydrate content of a food. Soluble fiber decreases the availability of glucose by delaying its absorption in the proximal small intestine, thus reducing the postprandial glucose levels (Jenkins et al., 1978; Schneeman, 1987a). Carrageenan, a seaweed extract, is a good source of soluble fiber (Montaño et al., 1985). This study aimed to determine the effect of carrageenan incorporation into arroz caldo on carbohydrate availability by monitoring the postprandial blood glucose levels of normal subjects. Control and experimental arroz caldo samples were prepared and subjected to proximate analysis and feeding studies. The total dietary fiber (TDF) content of the experimental (2.03%) was about thrice that of the control (0.68%). Using randomized crossover design, preweighed 55 g available carbohydrate serving portions of control and experimental arroz caldo samples, with 3.45 and 14.84 g TDF, respectively, were fed to ten fasting normal subjects then their postprandial blood glucose levels were determined at 15, 30, 45, 60 and 90 min intervals. Results of the short-term in vivo study showed that the mean postprandial glycaemic responses of subjects after consuming the experimental sample were significantly lower than the levels after consuming the control at 15, 45, and 90 min (P arroz caldo than control (147.29 +/- 53.34). The hypoglycaemic effect of carrageenan may prove useful in the prevention and management of metabolic conditions such as diabetes.

  2. End-to-End Availability Analysis of IMS-Based Networks

    DEFF Research Database (Denmark)

    Kamyod, Chayapol; Nielsen, Rasmus Hjorth; Prasad, Neeli R.

    2013-01-01

    Generation Networks (NGNs). In this paper, an end-to-end availability model is proposed and evaluated using a combination of Reliability Block Diagrams (RBD) and a proposed five-state Markov model. The overall availability for intra- and inter domain communication in IMS is analyzed, and the state...

  3. 5 CFR 842.705 - Alternative forms of annuities available.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Alternative forms of annuities available... SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES RETIREMENT SYSTEM-BASIC ANNUITY Alternative Forms of Annuities § 842.705 Alternative forms of annuities available. (a) An employee or Member who is eligible to...

  4. Nutrient availability at Mer Bleue bog measured by PRSTM probes

    Science.gov (United States)

    Wang, M.; Moore, T. R.; Talbot, J.

    2015-12-01

    Bogs, covering ~0.7 million km2 in Canada, store a large amount of C and N. As nutrient deficient ecosystems, it's critical to examine the nutrient availabilities and seasonal dynamics. We used Plant Root Simulators (PRSTM) at Mer Bleue bog to provide some baseline data on nutrient availability and its variability. In particular, we focused on ammonium, nitrate, phosphate, calcium, magnesium and potassium, iron, sulphate and aluminum. We placed PRS probes at a depth of 5 - 15 cm in pristine plots and plots with long term N, P and K fertilization for 4 weeks and determined the availability of these nutrients, from spring through to fall. Probes were also placed beneath the water table in hummock and hollow microtopography and along a transect including part of the bog which had been drained through the creation of a ditch 80 years ago. The result showed that there was limited available ammonium, nitrate and phosphate in the bog, the seasonal variation of nutrient availabilities probably due to mineralization, an increase in the availability of some nutrients between different water table depths or as a result of drainage, and the relative availability of nutrients compared to the input from fertilization. We suggest that PRS probes could be a useful tool to examine nutrient availability and dynamics in wetlands, with careful consideration of installing condition, for example, proper exposure period, depth relative to water table etc.

  5. Are essential medicines in Malaysia accessible, affordable and available?

    Science.gov (United States)

    Saleh, Kamaruzaman; Ibrahim, Mohamed I M

    2005-12-01

    To assess the pharmaceutical sector to know whether people have access to essential medicines. The study was conducted in 20 public health clinics, five public district drug stores and 20 private retail pharmacies selected randomly in five different areas randomly selected (four states and a federal territory). The methodology used was adopted from the World Health Organization study protocol. The degree of attainment of the strategic pharmaceutical objectives of improved access is measured by a list of tested indicators. Access is measured in terms of the availability and affordability of essential medicines, especially to the poor and in the public sector. The first survey in the public health clinics and public district drug stores gathered information about current availability of essential medicines, prevalence of stock-outs and affordability of treatment (except drug stores). The second survey assessed affordability of treatment in public health clinics and private retail pharmacies. Availability, stock-out duration, percent of medicines dispensed, accessibility and affordability of key medicines. The average availability of key medicines in the public health clinics for the country was 95.4%. The average stock-out duration of key medicines was 6.5 days. However, average availability of key medicines in the public district drug stores was 89.2%; with an average stock-out duration of 32.4 days. Medicines prescribed were 100% dispensed to the patients. Average affordability for public health clinics was 1.5 weeks salary and for the private pharmacies, 3.7 weeks salary. The present pharmaceutical situation in the context of essential medicines list implementation reflected that the majority of the population in Malaysia had access to affordable essential medicines. If medicines need to be obtained from the private sector, they are hardly affordable. Although the average availability of essential medicines in Malaysia was high being more than 95.0%, in certain

  6. Computation of Normal Conducting and Superconducting Linear Accelerator (LINAC) Availabilities

    International Nuclear Information System (INIS)

    Haire, M.J.

    2000-01-01

    A brief study was conducted to roughly estimate the availability of a superconducting (SC) linear accelerator (LINAC) as compared to a normal conducting (NC) one. Potentially, SC radio frequency cavities have substantial reserve capability, which allows them to compensate for failed cavities, thus increasing the availability of the overall LINAC. In the initial SC design, there is a klystron and associated equipment (e.g., power supply) for every cavity of an SC LINAC. On the other hand, a single klystron may service eight cavities in the NC LINAC. This study modeled that portion of the Spallation Neutron Source LINAC (between 200 and 1,000 MeV) that is initially proposed for conversion from NC to SC technology. Equipment common to both designs was not evaluated. Tabular fault-tree calculations and computer-event-driven simulation (EDS) computer computations were performed. The estimated gain in availability when using the SC option ranges from 3 to 13% under certain equipment and conditions and spatial separation requirements. The availability of an NC LINAC is estimated to be 83%. Tabular fault-tree calculations and computer EDS modeling gave the same 83% answer to within one-tenth of a percent for the NC case. Tabular fault-tree calculations of the availability of the SC LINAC (where a klystron and associated equipment drive a single cavity) give 97%, whereas EDS computer calculations give 96%, a disagreement of only 1%. This result may be somewhat fortuitous because of limitations of tabular fault-tree calculations. For example, tabular fault-tree calculations can not handle spatial effects (separation distance between failures), equipment network configurations, and some failure combinations. EDS computer modeling of various equipment configurations were examined. When there is a klystron and associated equipment for every cavity and adjacent cavity, failure can be tolerated and the SC availability was estimated to be 96%. SC availability decreased as

  7. Maintenance and availability considerations for MFTF-B upgrade

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1983-01-01

    The upgrade of the Mirror Fusion Test Facility (MFTF-B) tandem mirror device incorporates the operation of advanced systems plus the requirement for remote maintenance. To determine if the operating availability goal of this device is achievable, an assessment of component lifetimes was made, along with estimates of device downtime. Key subsystem components were considered from the magnet, heating, impurity control, pumping, and test module systems. Component replacements were grouped into three categories, and a lifetime operating plan, including component replacements, was developed. It was determined that this device could achieve a 10% operating availability

  8. Google Scholar and 100 Percent Availability of Information

    Directory of Open Access Journals (Sweden)

    Jeffrey Pomerantz

    2006-06-01

    Full Text Available This paper discusses Google Scholar as an extension of Kilgour’s goal to improve the availability of information. Kilgour was instrumental in the early development of the online library catalog, and he proposed passage retrieval to aid in information seeking. Google Scholar is a direct descendent of these technologies foreseen by Kilgour. Google Scholar holds promise as a means for libraries to expand their reach to new user communities, and to enable libraries to provide quality resources to users during their online search process.

  9. Communication gap analysis of the availability of tourism related ...

    African Journals Online (AJOL)

    The paper assesses the availability of tourism related information on the Ghana's tourism to visitors' from the UK, the USA and Germany. The discrepancy approach which relates the expected (basic information to make effective travel decisions) to the actual situation (actual travel information available for planning a trip) ...

  10. Availability and affordability of antiglaucoma drugs in Benin city ...

    African Journals Online (AJOL)

    Glaucoma is a leading cause of blindness. Affordability and availability are key factors that determine access to effective treatment. The aim of this study is to investigate the availability and affordability of antiglaucoma medicines in Benin City. A cross sectional survey of the major drug distribution sectors was conducted.

  11. 7 CFR 1718.104 - Availability of model loan contract.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE LOAN SECURITY DOCUMENTS FOR ELECTRIC BORROWERS Loan Contracts With Distribution Borrowers § 1718.104 Availability of model loan contract. Single copies of the model loan contract (RUS... 7 Agriculture 11 2010-01-01 2010-01-01 false Availability of model loan contract. 1718.104 Section...

  12. 5 CFR 831.2204 - Alternative forms of annuities available.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Alternative forms of annuities available... SERVICE REGULATIONS (CONTINUED) RETIREMENT Alternative Forms of Annuities § 831.2204 Alternative forms of annuities available. (a) An employee or Member who is eligible to make an election under § 831.2203 may...

  13. 42 CFR 440.255 - Limited services available to certain aliens.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limited services available to certain aliens. 440... Limits Applicable to All Services § 440.255 Limited services available to certain aliens. (a) FFP for services. FFP is available for services provided to aliens described in this section which are necessary to...

  14. Space Transportation System Availability Requirements and Its Influencing Attributes Relationships

    Science.gov (United States)

    Rhodes, Russel E.; Adams, TImothy C.

    2008-01-01

    It is essential that management and engineering understand the need for an availability requirement for the customer's space transportation system as it enables the meeting of his needs, goal, and objectives. There are three types of availability, e.g., operational availability, achieved availability, or inherent availability. The basic definition of availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. The major difference is the inclusiveness of the functions within the mean downtime and the mean uptime. This paper will address tIe inherent availability which only addresses the mean downtime as that mean time to repair or the time to determine the failed article, remove it, install a replacement article and verify the functionality of the repaired system. The definitions of operational availability include the replacement hardware supply or maintenance delays and other non-design factors in the mean downtime. Also with inherent availability the mean uptime will only consider the mean time between failures (other availability definitions consider this as mean time between maintenance - preventive and corrective maintenance) that requires the repair of the system to be functional. It is also essential that management and engineering understand all influencing attributes relationships to each other and to the resultant inherent availability requirement. This visibility will provide the decision makers with the understanding necessary to place constraints on the design definition for the major drivers that will determine the inherent availability, safety, reliability, maintainability, and the life cycle cost of the fielded system provided the customer. This inherent availability requirement may be driven by the need to use a multiple launch approach to placing humans on the moon or the desire to control the number of spare parts required to support long stays in either orbit or on the surface of the moon or mars. It is

  15. Best available technology for European livestock farms

    DEFF Research Database (Denmark)

    Loyon, L.; Burton, C. H.; Misselbrook, T.

    2016-01-01

    Concerns over the negative environmental impact from livestock farming across Europe continue to make their mark resulting in new legislation and large research programs. However, despite a huge amount of published material and many available techniques, doubts over the success of national...

  16. How valid are commercially available medical simulators?

    NARCIS (Netherlands)

    Stunt, J.J.; Wulms, P.H.; Kerkhoffs, G.M.; Dankelman, J.; Van Dijk, C.N.; Tuijthof, G.J.M.

    2014-01-01

    Background: Since simulators offer important advantages, they are increasingly used in medical education and medical skills training that require physical actions. A wide variety of simulators have become commercially available. It is of high importance that evidence is provided that training on

  17. Water Availability and Management of Water Resources

    Science.gov (United States)

    One of the most pressing national and global issues is the availability of freshwater due to global climate change, energy scarcity issues and the increase in world population and accompanying economic growth. Estimates of water supplies and flows through the world's hydrologic c...

  18. Water availability and management for food security

    Science.gov (United States)

    Food security is directly linked to water security for food production. Water availability for crop production will be dependent upon precipitation or irrigation, soil water holding capacity, and crop water demand. The linkages among these components in rainfed agricultural systems shows the impact ...

  19. Planning an Availability Demonstration Test with Consideration of Confidence Level

    Directory of Open Access Journals (Sweden)

    Frank Müller

    2017-08-01

    Full Text Available The full service life of a technical product or system is usually not completed after an initial failure. With appropriate measures, the system can be returned to a functional state. Availability is an important parameter for evaluating such repairable systems: Failure and repair behaviors are required to determine this availability. These data are usually given as mean value distributions with a certain confidence level. Consequently, the availability value also needs to be expressed with a confidence level. This paper first highlights the bootstrap Monte Carlo simulation (BMCS for availability demonstration and inference with confidence intervals based on limited failure and repair data. The BMCS enables point-, steady-state and average availability to be determined with a confidence level based on the pure samples or mean value distributions in combination with the corresponding sample size of failure and repair behavior. Furthermore, the method enables individual sample sizes to be used. A sample calculation of a system with Weibull-distributed failure behavior and a sample of repair times is presented. Based on the BMCS, an extended, new procedure is introduced: the “inverse bootstrap Monte Carlo simulation” (IBMCS to be used for availability demonstration tests with consideration of confidence levels. The IBMCS provides a test plan comprising the required number of failures and repair actions that must be observed to demonstrate a certain availability value. The concept can be applied to each type of availability and can also be applied to the pure samples or distribution functions of failure and repair behavior. It does not require special types of distribution. In other words, for example, a Weibull, a lognormal or an exponential distribution can all be considered as distribution functions of failure and repair behavior. After presenting the IBMCS, a sample calculation will be carried out and the potential of the BMCS and the IBMCS

  20. Available climatological and oceanographical data for site investigation program

    International Nuclear Information System (INIS)

    Lindell, S.; Ambjoern, C.; Juhlin, B.; Larsson-McCann, S.; Lindquist, K.

    2000-03-01

    Information on available data, measurements and models for climate, meteorology, hydrology and oceanography for six communities have been analysed and studied. The six communities are Nykoeping, Oesthammar, Oskarshamn, Tierp, Hultsfred and Aelvkarleby all of them selected by Svensk Kaernbraenslehantering AB, SKB, for a pre-study on possibilities for deep disposal of used nuclear fuel. For each of them a thorough and detailed register of available climatological data together with appropriate statistical properties are listed. The purpose is to compare the six communities concerning climatological and oceanographical data available and analyse the extent of new measurements or model applications needed for all of the selected sites. Statistical information on precipitation, temperature and runoff has good coverage in all of the six communities. If new information concerning any of these variables is needed in sites where no data collection exist today new installation can be made. Data on precipitation in form of snow and days with snow coverage is also available but to a lesser extent. This concerns also days with ground frost and average ground frost level where there is no fully representation of data. If more information is wanted concerning these variables new measurements or model calculations must be initiated. Data on freeze and break-up of ice on lakes is also insufficient but this variable can be calculated with good result by use of one-dimensional models. Data describing air pressure tendency and wind velocity and direction is available for all communities and this information should be sufficient for the purpose of SKB. This is also valid for the variables global radiation and duration of sunshine where no new data should be needed. Measured data on evaporation is normally not available in Sweden more than in special research basins. Actual evaporation is though a variable that easily can be calculated by use of models. There are many lakes in the six

  1. Available climatological and oceanographical data for site investigation program

    Energy Technology Data Exchange (ETDEWEB)

    Lindell, S.; Ambjoern, C.; Juhlin, B.; Larsson-McCann, S.; Lindquist, K. [Swedish Meteorological and Hydrological Inst., Norrkoeping (Sweden)

    2000-03-15

    Information on available data, measurements and models for climate, meteorology, hydrology and oceanography for six communities have been analysed and studied. The six communities are Nykoeping, Oesthammar, Oskarshamn, Tierp, Hultsfred and Aelvkarleby all of them selected by Svensk Kaernbraenslehantering AB, SKB, for a pre-study on possibilities for deep disposal of used nuclear fuel. For each of them a thorough and detailed register of available climatological data together with appropriate statistical properties are listed. The purpose is to compare the six communities concerning climatological and oceanographical data available and analyse the extent of new measurements or model applications needed for all of the selected sites. Statistical information on precipitation, temperature and runoff has good coverage in all of the six communities. If new information concerning any of these variables is needed in sites where no data collection exist today new installation can be made. Data on precipitation in form of snow and days with snow coverage is also available but to a lesser extent. This concerns also days with ground frost and average ground frost level where there is no fully representation of data. If more information is wanted concerning these variables new measurements or model calculations must be initiated. Data on freeze and break-up of ice on lakes is also insufficient but this variable can be calculated with good result by use of one-dimensional models. Data describing air pressure tendency and wind velocity and direction is available for all communities and this information should be sufficient for the purpose of SKB. This is also valid for the variables global radiation and duration of sunshine where no new data should be needed. Measured data on evaporation is normally not available in Sweden more than in special research basins. Actual evaporation is though a variable that easily can be calculated by use of models. There are many lakes in the six

  2. Management and communication courses – Places available

    CERN Multimedia

    2012-01-01

    Please note that there are some places available in the following management and communication courses starting in September or October. For more information on the course, click on the course title, which will bring you to the training catalogue. You can then sign-up on line. For advice, you can contact Erwin Mosselmans (Tel.: 74125). HR Department Course Next Session Duration Language Availability Personal Awareness & Impact 10-11-12 September 3 days Bilingual 1 place Personal Awareness & Impact 17-18-19 September 3 days 2 places Procurement and Contract Management Training on Supplies 27 September 1 day 3 places Procurement and Contract Management Training on Industrial Services 12 October 1 day 5 places Core Development Package  Essentials of People Management for CERN Supervisors 01-02 October 23-24 January 2013 7-8 March 2013 6 days English 7 places Conflict Resolution for Ma...

  3. Management and communication courses – Places available

    CERN Multimedia

    2014-01-01

    Please note that there are some places available on the following management and communication courses starting in September or October.   For more information on the course, click on the course title, which will take you to the training catalogue. You can then sign up on line.  .tftable {color:#333333;width:100%;border-width: 1px;border-color: #a9a9a9;border-collapse: collapse;} .tftable th {background-color:#cdcdcd;border-width: 1px;padding: 8px;border-style: solid;border-color: #a9a9a9;text-align:left;} .tftable tr {background-color:#ffffff;} .tftable td {border-width: 1px;padding: 8px;border-style: solid;border-color: #a9a9a9;} Course Next session Duration Language Availability Managing Time 15 September 9 October 7 November 20 hours English 2 Managing Stress 6 October 7 October 16 hours English 5  

  4. Management and communication courses – Places available

    CERN Multimedia

    2013-01-01

    There are places available in some management and communication courses taking place in the period April to June 2013.   For more information on the course, click on the course title, this will bring you to the training catalogue. You can then sign-up online. For advice, you can contact: - Erwin Mosselmans, tel. 74125, erwin.mosselmans@cern.ch - Nathalie Dumeaux, tel. 78144, nathalie.dumeaux@cern.ch Courses in English (or bilingual) Sessions Duration Language Availability Managing stress 29 and 30 May 2 days English 3 places Making Presentations 30, 31 May & 25 June 3 days English 2 places Communicating Effectively - Residential course 4 to 6 June 3 days Bilingual 9 places Handling difficult conversations (Adapted from Dealing with Conflict) 7 and 14 June and 13 September 3 days English 6 places Voice and Nonverbal Behaviour in Speech Communication 17 and 18 June 1 day 4 hours English 7 plac...

  5. Temporal variability of available P, microbial P and some ...

    African Journals Online (AJOL)

    Temporal variability of available P, microbial P and some phosphomonoesterase activities in a sewage sludge treated soil: The effect of soil water potential. ... African Journal of Biotechnology ... The objective of this study was to test the effects of water potential on soil available P, microbial biomass P(MBP) and some

  6. 21 CFR 1210.10 - Availability for examination and inspection.

    Science.gov (United States)

    2010-04-01

    ... REGULATIONS UNDER THE FEDERAL IMPORT MILK ACT Inspection and Testing § 1210.10 Availability for examination and inspection. Dairy farms and plants from which milk or cream is shipped or transported into the... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Availability for examination and inspection. 1210...

  7. 9 CFR 350.3 - Types and availability of service.

    Science.gov (United States)

    2010-01-01

    ....3 Section 350.3 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... product must be sound, wholesome and fit for human food. The service will be available only on premises... service will be available for products moved in tank cars and tank trucks from an official establishment...

  8. Reliability and availability of high power proton accelerators

    International Nuclear Information System (INIS)

    Cho, Y.

    1999-01-01

    It has become increasingly important to address the issues of operational reliability and availability of an accelerator complex early in its design and construction phases. In this context, reliability addresses the mean time between failures and the failure rate, and availability takes into account the failure rate as well as the length of time required to repair the failure. Methods to reduce failure rates include reduction of the number of components and over-design of certain key components. Reduction of the on-line repair time can be achieved by judiciously designed hardware, quick-service spare systems and redundancy. In addition, provisions for easy inspection and maintainability are important for both reduction of the failure rate as well as reduction of the time to repair. The radiation safety exposure principle of ALARA (as low as reasonably achievable) is easier to comply with when easy inspection capability and easy maintainability are incorporated into the design. Discussions of past experience in improving accelerator availability, some recent developments, and potential R and D items are presented. (author)

  9. ENSEIGNEMENT TECHNIQUE TECHNICAL TRAINING Places disponibles*/Places available **

    CERN Multimedia

    2003-01-01

    * Etant donné le délai d'impression du Bulletin, ces places peuvent ne plus être disponibles au moment de sa parution. Veuillez consulter notre site Web pour avoir la dernière mise à jour. ** The number of places available may vary. Please check our Web site to find out the current availability. Des places sont disponibles dans les cours suivants : Places are available in the following courses : Java 2 Enterprise Edition - Part 2 : Enterprise JavaBeans : 8 - 10.10.2003 (3 days) FileMaker - niveau 1 : 9 & 10.10.03 (2 jours) EXCEL 2000 - niveau 1 : 20 & 22.10.03 (2 jours) CLEAN-2002 : Working in a Cleanroom : 23.10.03 (half day, free of charge) Plannification de projet avec MS-Project/Project Scheduling with MS-Project : 2 sessions : 23.10 & 4.11.03 and 18 &25.11.03 (2 jours/2 days - langue à définir/language to be defined) AutoCAD 2002 – Level 1 : 3, 4, 12, 13.11.03 (4 days) Introduction to Pspice : 4.11...

  10. Estimating Nitrogen Availability of Heat-Dried Bio solids

    International Nuclear Information System (INIS)

    Cogger, C.G.; Bary, A.I.; Myhre, E.A.

    2011-01-01

    As heat-dried bio solids become more widely produced and marketed, it is important to improve estimates of N availability from these materials. Objectives were to compare plant-available N among three different heat-dried bio solids and determine if current guidelines were adequate for estimating application rates. Heat-dried bio solids were surface applied to tall fescue (Festuca arundinacea Schreb.) in Washington State, USA, and forage yield and N uptake measured for two growing seasons following application. Three rates of urea and a zero-N control were used to calculate N fertilizer efficiency regressions. Application year plant-available N (estimated as urea N equivalent) for two bio solids exceeded 60% of total N applied, while urea N equivalent for the third bio solids was 45%. Residual (second-year) urea N equivalent ranged from 5 to 10%. Guidelines for the Pacific Northwest USA recommend mineralization estimates of 35 to 40% for heat-dried bio solids, but this research shows that some heat-dried materials fall well above that range.

  11. [Mapping of the key oncology indicators available in France].

    Science.gov (United States)

    Laanani, Moussa; Vongmany, Natalie; Lafay, Lionel; Cerf, Nicole Rasamimanana; Le Quellec-Nathan, Martine; Viguier, Jérôme; Bousquet, Philippe Jean

    2014-01-01

    Available data in the field of oncology in France are scattered due to the large number of available indicators and their sources. In order to facilitate identification and analysis of these indicators, the French National Cancer Institute (INCa) has mapped the main indicators available in oncology. Mapping was based on the needs of various categories of potential users. Standardized interviews were conducted face-to-face or by email among representatives to determine their needs and expectations. The underlying data sources were also identified: databases, national surveys, websites. A first selection of indicators was proposed in the report entitled "La situation du cancer en France en 2009" ("The state of cancer in France in 2009") and was expanded. Data collection concerning indicators was performed among INCa correspondents for each theme. Several themes were defined: epidemiology, prevention and risk factors, screening, medical demography, health care offer, living conditions, costs and expenses, research. Data were classified according to: geographical coverage, age, gender, type of cancer, occupational categories. This information was collected for each indicator selected and was made available via the cancer data website (http://lesdonnees.e-cancer.fr). The available oncology indicators are numerous and scattered. Mapping can be a useful tool to facilitate access to these indicators. It should be regularly updated to reflect the most recent data.

  12. Fuel efficiency, availability and compressor station configuration

    Energy Technology Data Exchange (ETDEWEB)

    Lubomirsky, Matt; Kurz, Rainer [Solar Turbines Inc., San Diego, CA (United States); Klimov, Pavel [Intergas Central Asia, Astana (Kazakhstan)

    2009-12-19

    Compressor stations play a very important role in the success of a gas pipeline design and a careful selection of centrifugal compressors and drivers are key aspects for the success of the project. The state of the art design available today for this equipment provides overall high thermodynamic performance and consequently minimizes installed power requirements and energy usage with significant savings on operating expenses during the economic life of the project For any application of machinery in a pipeline compression station, one of the key questions to answer is the number of units to install to meet the flow requirements of the pipeline. Depending on the load profile of the pipeline, the answers may look different. Other factors to consider include the fact that gas turbines can produce a significant amount of additional power at lower ambient temperatures. So, even for constant load of the pipeline, the relative load of the driver changes. In this paper, a typical transcontinental pipeline with multiple compressor stations is evaluated. The determination of the exact hydraulic behavior of the pipeline is part of the modeling effort. The site ambient conditions, with a significant swing in ambient temperatures are considered. The issue discussed in this paper evolves around the availability that can be achieved with various configurations, based on actually achieved reliability and availability numbers. The other large impact on operating costs, fuel consumption will be discussed. Here, the choice of the number of installed units has a distinct impact on annual fuel consumption, as well as the capacity of the pipeline during various scenarios. (author)

  13. 46 CFR 503.24 - Information available via the internet.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Information available via the internet. 503.24 Section... Information Act Procedures § 503.24 Information available via the internet. (a) The Commission maintains an internet web site. The Commission home page may be found at http://www.fmc.gov. (b) The following general...

  14. Assessment of resource availability and sustainability for ...

    African Journals Online (AJOL)

    The availability of resources and their suitability for subsistence and small-scale commercial fishers in South Africa were assessed and appropriate options for the management of resources recommended. Assessment of current resource utilization and recommendations for future subsistence and/or small-scale commercial ...

  15. Drought, pollen and nectar availability, and pollination success.

    Science.gov (United States)

    Waser, Nickolas M; Price, Mary V

    2016-06-01

    Pollination success of animal-pollinated flowers depends on rate of pollinator visits and on pollen deposition per visit, both of which should vary with the pollen and nectar "neighborhoods" of a plant, i.e., with pollen and nectar availability in nearby plants. One determinant of these neighborhoods is per-flower production of pollen and nectar, which is likely to respond to environmental influences. In this study, we explored environmental effects on pollen and nectar production and on pollination success in order to follow up a surprising result from a previous study: flowers of Ipomopsis aggregata received less pollen in years of high visitation by their hummingbird pollinators. A new analysis of the earlier data indicated that high bird visitation corresponded to drought years. We hypothesized that drought might contribute to the enigmatic prior result if it decreases both nectar and pollen production: in dry years, low nectar availability could cause hummingbirds to visit flowers at a higher rate, and low pollen availability could cause them to deposit less pollen per visit. A greenhouse experiment demonstrated that drought does reduce both pollen and nectar production by I. aggregata flowers. This result was corroborated across 6 yr of variable precipitation and soil moisture in four unmanipulated field populations. In addition, experimental removal of pollen from flowers reduced the pollen received by nearby flowers. We conclude that there is much to learn about how abiotic and biotic environmental drivers jointly affect pollen and nectar production and availability, and how this contributes to pollen and nectar neighborhoods and thus influences pollination success.

  16. Enterprise architecture availability analysis using fault trees and stakeholder interviews

    Science.gov (United States)

    Närman, Per; Franke, Ulrik; König, Johan; Buschle, Markus; Ekstedt, Mathias

    2014-01-01

    The availability of enterprise information systems is a key concern for many organisations. This article describes a method for availability analysis based on Fault Tree Analysis and constructs from the ArchiMate enterprise architecture (EA) language. To test the quality of the method, several case-studies within the banking and electrical utility industries were performed. Input data were collected through stakeholder interviews. The results from the case studies were compared with availability of log data to determine the accuracy of the method's predictions. In the five cases where accurate log data were available, the yearly downtime estimates were within eight hours from the actual downtimes. The cost of performing the analysis was low; no case study required more than 20 man-hours of work, making the method ideal for practitioners with an interest in obtaining rapid availability estimates of their enterprise information systems.

  17. Amending triple superphosphate with chicken litter biochar improves phosphorus availability

    Directory of Open Access Journals (Sweden)

    Audrey Asap

    2018-04-01

    Full Text Available The reaction of H2PO42- and HPO4- with Al and Fe in acid soils to form a precipitate reduces P availability. Chicken litter biochar has been used to improve soil P availability for maize production but with limited information on optimum rates of biochar and Triple Superphosphate (TSP to increase P availability. This study determined the optimum amount of chicken litter biochar and TSP that could increase P availability. Different rates of chicken litter biochar and TSP were evaluated in an incubation study for 30, 60, and 90 days. Selected soil chemical properties before and after incubation were determined using standard procedures. Soil pH, total P, available P, and water soluble P increased in treatments with 75% and 50% biochar. Total acidity, exchangeable Al3+, and Fe2+ were significantly reduced by the chicken litter biochar. The chicken litter biochar also increased soil CEC and exchangeable cations (K, Ca, Mg and Na. The use of 75% and 50% of 5 t ha-1 biochar with 25% TSP of the existing recommendation can be used to increase P availability whilst minimizing soil Al and Fe content. This rates can be used to optimize chicken litter biochar and TSP use in acid soils for crop production especially maize and short term vegetables.

  18. Technical Training - Places available

    CERN Multimedia

    Monique Duval

    2003-01-01

    Places are available in the following courses: HeREF-2003 : Techniques de la réfrigération Hélium :  6 - 10.10.2003  (7 demi-journées, cours en français avec support en anglais)  The Java Programming Language Level 1:  6 - 7.10.2003  (2 days) Java 2 Enterprise Edition - Part 2: Enterprise JavaBeans: 8 - 10.10.2003  (3 days) FileMaker - niveau 1 : 9 & 10.10.03 (2 jours) EXCEL 2000 - niveau 1 :  20 & 22.10.03  (2 jours) AutoCAD 2002 - niveau 1 :  20, 21, 27, 28.10.03  (4 jours) CLEAN-2002 : Working in a Cleanroom: 23.10.03  (half day, free of charge) Plannification de projet avec MS-Project/ Project Scheduling with MS-Project : 2 sessions:  23.10 & 4.11.03  (2 jours/2 days and 18 &25.11.03 langue à définir/language to be defined) AutoCAD 2002 - Level 1:  3, 4, 12, 13.11.03  (4 days) Introduction to Pspice:  4.11.03p.m.  (half-day) AutoCAD 2002 - niveau 2 :  10 & 11.11.03  (2 jours) ACCESS 2000 - niveau 1 :  13 & 14.11.03  (2 jours) A...

  19. Space Transportation System Availability Relationships to Life Cycle Cost

    Science.gov (United States)

    Rhodes, Russel E.; Donahue, Benjamin B.; Chen, Timothy T.

    2009-01-01

    Future space transportation architectures and designs must be affordable. Consequently, their Life Cycle Cost (LCC) must be controlled. For the LCC to be controlled, it is necessary to identify all the requirements and elements of the architecture at the beginning of the concept phase. Controlling LCC requires the establishment of the major operational cost drivers. Two of these major cost drivers are reliability and maintainability, in other words, the system's availability (responsiveness). Potential reasons that may drive the inherent availability requirement are the need to control the number of unique parts and the spare parts required to support the transportation system's operation. For more typical space transportation systems used to place satellites in space, the productivity of the system will drive the launch cost. This system productivity is the resultant output of the system availability. Availability is equal to the mean uptime divided by the sum of the mean uptime plus the mean downtime. Since many operational factors cannot be projected early in the definition phase, the focus will be on inherent availability which is equal to the mean time between a failure (MTBF) divided by the MTBF plus the mean time to repair (MTTR) the system. The MTBF is a function of reliability or the expected frequency of failures. When the system experiences failures the result is added operational flow time, parts consumption, and increased labor with an impact to responsiveness resulting in increased LCC. The other function of availability is the MTTR, or maintainability. In other words, how accessible is the failed hardware that requires replacement and what operational functions are required before and after change-out to make the system operable. This paper will describe how the MTTR can be equated to additional labor, additional operational flow time, and additional structural access capability, all of which drive up the LCC. A methodology will be presented that

  20. Predicting and mapping soil available water capacity in Korea.

    Science.gov (United States)

    Hong, Suk Young; Minasny, Budiman; Han, Kyung Hwa; Kim, Yihyun; Lee, Kyungdo

    2013-01-01

    The knowledge on the spatial distribution of soil available water capacity at a regional or national extent is essential, as soil water capacity is a component of the water and energy balances in the terrestrial ecosystem. It controls the evapotranspiration rate, and has a major impact on climate. This paper demonstrates a protocol for mapping soil available water capacity in South Korea at a fine scale using data available from surveys. The procedures combined digital soil mapping technology with the available soil map of 1:25,000. We used the modal profile data from the Taxonomical Classification of Korean Soils. The data consist of profile description along with physical and chemical analysis for the modal profiles of the 380 soil series. However not all soil samples have measured bulk density and water content at -10 and -1500 kPa. Thus they need to be predicted using pedotransfer functions. Furthermore, water content at -10 kPa was measured using ground samples. Thus a correction factor is derived to take into account the effect of bulk density. Results showed that Andisols has the highest mean water storage capacity, followed by Entisols and Inceptisols which have loamy texture. The lowest water retention is Entisols which are dominated by sandy materials. Profile available water capacity to a depth of 1 m was calculated and mapped for Korea. The western part of the country shows higher available water capacity than the eastern part which is mountainous and has shallower soils. The highest water storage capacity soils are the Ultisols and Alfisols (mean of 206 and 205 mm, respectively). Validation of the maps showed promising results. The map produced can be used as an indication of soil physical quality of Korean soils.