WorldWideScience

Sample records for acquisition program technical

  1. 48 CFR 227.7103-2 - Acquisition of technical data.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Acquisition of technical... Rights in Technical Data 227.7103-2 Acquisition of technical data. (a) Contracting officers shall work... personnel are responsible for identifying the Government's minimum needs for technical data. Data needs must...

  2. Use Of ProductionService Work In Enhancing Skill Acquisition In Technical Colleges In North Central Nigeria

    Directory of Open Access Journals (Sweden)

    Peter Ashlame Agu

    2015-08-01

    Full Text Available Skill acquisition is a critical component of any vocational or technical training program. When this component is missing or falls below expectation it tends to defeat the objectives or the essence of the program. In Nigeria many skill acquisition institutions experience great challenges in trying to provide the necessary facilities required for effective vocational training of those enrolled in their programs because of paucity of funds. The result is that students graduate from the programs without adequate employability skills for meaningful productiveservice work after leaving school. In realization of this shortfall government has directed technical colleges to establish what is called ProductionService Work PSW into its curriculum. This is with the view that in the event that there is shortfall in the supply of training facilities by sponsors of the programs jobs could be brought in from inside or outside the school which could provide opportunity for students to acquire hands-on experience that would equip them with requisite skills for post-graduation work. As laudable as this initiative appears to be many schools in the North Central Nigeria are yet to implement the directive of the federal government in their schools and even where this has been done its implementation does not appear to be viable. Over the years different technical colleges have adopted different approaches toward the establishment and management of productionservice work in their schools. While some have recorded appreciable success in its implementation others seem to exist only in name. The present study therefore sought to identify the current practices employed in the use of PSW in technical colleges the appropriateness of the practices in use and the alternative practices that could be adopted to improve and guide the implementation of the program with a view to enhancing the acquisition of employability skills in technical colleges in North Central Nigeria.

  3. Performance-based service acquisition (PBSA) of TRIDENT strategic weapons systems (SWS) technical engineering support (TES) services

    OpenAIRE

    Arcidiacono, William J.

    2003-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited The objective of this thesis is to determine whether the Strategic Systems Programs (SSP) should apply the concepts of Performance-Based Service Acquisition (PBSA) to Strategic Weapons Systems (SWS) Technical Engineering Support (TES) Services. This thesis provides a Department of Defense (DoD), Department of the Navy (DON), and SSP SWS program acquisition and PBSA history background, ...

  4. Expansion Policy of Secondary Technical Education as a Correlate to the Acquisition of Basic Technical Skills by Students in Cameroon

    Science.gov (United States)

    Efande, Lyonga John

    2015-01-01

    This study aims at investigating the relationship between the expansion of secondary Technical Education on the acquisition of technical skills by students. Technical Vocational Education and Training (TVET) has been expanding quantitatively yearly without paying enough attention to its adverse effect on quality and the acquisition of the…

  5. TMI-2 Technical Information and Examination Program 1983 annual report

    International Nuclear Information System (INIS)

    Scardena, D.E.

    1984-04-01

    The Department of Energy's Technical Information and Examination Program at Three Mile Island Unit 2 continued the research and development work begun on the Island in 1980. The work concentrated in six major areas: waste immobilization, reactor evaluation, data acquisition, information and industry coordination, core activities, and EPICOR II and waste research and disposition. The program assists in resolving specific problems at TMI-2 while developing techniques and broadening understanding of accident consequences to improve the overall safety and reliability of nuclear power. The Technical Information and Examination Program aims to communicate applicable information to the nuclear power industry to ensure that the industry can avail itself to the maximum amount of information possible

  6. Acquisition Program Teamwork and Performance Seen Anew: Exposing the Interplay of Architecture and Behaviors in Complex Defense Programs

    Science.gov (United States)

    2016-04-30

    created an organizational crisis, spurring what is arguably the most successful acquisition reform effort in U.S. defense industry history. Diagnosis and...programs as sociotechnical systems with program performance driven by interpersonal and inter- organizational dynamics as well as technical system...interdependencies are acknowledged in traditional organizational /management literature, they are seldom defined at the level of specificity that is required

  7. Technical skills acquisition in surgery-bound senior medical students: an evaluation of student assertiveness.

    Science.gov (United States)

    Talbott, Vanessa A; Marks, Joshua A; Bodzin, Adam S; Comeau, Jason A; Maxwell, Pinckney J; Isenberg, Gerald A; Martin, Niels D

    2012-01-01

    factors and ultimately enhance technical skills acquisition during medical school. Copyright © 2012 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  8. Acquisition: Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs

    National Research Council Canada - National Science Library

    2004-01-01

    ... deviations in cost, schedule, and performance requirements in acquisition program baselines for Acquisition Category II and III programs and in identifying whether program managers are reporting...

  9. TMI-2 Technical Information and Examination Program. 1984 annual report

    International Nuclear Information System (INIS)

    Hess, C.J.

    1985-04-01

    In 1984, the US Department of Energy's Technical Information and Examination Program entered its fifth year of research and development work at Three Mile Island Unit 2 (TMI-2) and at the Idaho National Engineering Laboratory and other supporting laboratories. The work concentrated on six major areas: waste immobilization, reactor evaluation, data acquisition, information and industry coordination, core activities, and EPICOR II and waste research and disposition

  10. Acquisition Research Program Homepage

    OpenAIRE

    2015-01-01

    Includes an image of the main page on this date and compressed file containing additional web pages. Established in 2003, Naval Postgraduate School’s (NPS) Acquisition Research Program provides leadership in innovation, creative problem solving and an ongoing dialogue, contributing to the evolution of Department of Defense acquisition strategies.

  11. 76 FR 11414 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Science.gov (United States)

    2011-03-02

    ... Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions (DFARS Case... (DFARS) to require contractors to report independent research and development (IR&D) projects generating... to the Defense Technical Information Center (DTIC). Beginning in the 1990s, DoD reduced its technical...

  12. Developing Program Management Leadership for Acquisition Reform

    Science.gov (United States)

    2011-04-30

    mêçÅÉÉÇáåÖë= çÑ=íÜÉ= bfdeqe=^kkr^i=^`nrfpfqflk== obpb^o`e=pvjmlpfrj== qeropa^v=pbppflkp== slirjb ff Developing Program Management Leadership for...4. TITLE AND SUBTITLE Developing Program Management Leadership for Acquisition Reform 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Developing Program  Management   Leadership   for Acquisition Reform    The 8th Annual Acquisition Research Symposium Panel #20: Investing in People

  13. 77 FR 4632 - Defense Federal Acquisition Regulation Supplement; Independent Research and Development Technical...

    Science.gov (United States)

    2012-01-30

    ... Federal Acquisition Regulation Supplement; Independent Research and Development Technical Descriptions... Regulation Supplement (DFARS) to require major contractors to report independent research and development (IR... 11414 on March 2, 2011, to revise requirements for reporting IR&D projects to the Defense Technical...

  14. Matrix organizational structure and its effect on Army acquisition program management offices

    OpenAIRE

    Ostrowski, Paul Adam.

    1996-01-01

    With the implementation of the Defense Management Review, and publications of DoD Directive 5000.1 and DoD 5OOO.2-R, the Army was mandated to restructure program offices with the intent of cutting waste and fraud within the defense acquisition process. The goal was to establish an organizational structure which could operate efficiently in an environment of shrinking budgets and increasing technical specialization. To address this challenge, the Army followed the aerospace industry's lead, an...

  15. Program design of data acquisition in Windows

    International Nuclear Information System (INIS)

    Cai Jianxin; Yan Huawen

    2004-01-01

    Several methods for the design of data acquisition program based on Microsoft Windows are introduced. Then their respective advantages and disadvantages are totally analyzed. At the same time, the data acquisition modes applicable to each method are also pointed out. It is convenient for data acquisition programmers to develop data acquisition systems. (authors)

  16. War-gaming application for future space systems acquisition: MATLAB implementation of war-gaming acquisition models and simulation results

    Science.gov (United States)

    Vienhage, Paul; Barcomb, Heather; Marshall, Karel; Black, William A.; Coons, Amanda; Tran, Hien T.; Nguyen, Tien M.; Guillen, Andy T.; Yoh, James; Kizer, Justin; Rogers, Blake A.

    2017-05-01

    The paper describes the MATLAB (MathWorks) programs that were developed during the REU workshop1 to implement The Aerospace Corporation developed Unified Game-based Acquisition Framework and Advanced Game - based Mathematical Framework (UGAF-AGMF) and its associated War-Gaming Engine (WGE) models. Each game can be played from the perspectives of the Department of Defense Acquisition Authority (DAA) or of an individual contractor (KTR). The programs also implement Aerospace's optimum "Program and Technical Baseline (PTB) and associated acquisition" strategy that combines low Total Ownership Cost (TOC) with innovative designs while still meeting warfighter needs. The paper also describes the Bayesian Acquisition War-Gaming approach using Monte Carlo simulations, a numerical analysis technique to account for uncertainty in decision making, which simulate the PTB development and acquisition processes and will detail the procedure of the implementation and the interactions between the games.

  17. Acquisition Program Transition Workshops: An Element of the DSMC Program Manager Mission Assistance Capability

    Science.gov (United States)

    2011-10-01

    specific modules as needed. The term “startup” is inclusive of any point in a DoD acquisition program. As noted above, methodology for conducting...Acquisition Sustainment =Decision Point =Milestone Review =Decision Point if PDR is not conducted before Milestone B ProgramA B Initiation) C IOC FOC...start a new program 2.2 Background Conclusions flowing from these observations led the Office of the Secretary of Defense, the De - fense Acquisition

  18. Technical skill acquisition in the Tanzanian oil sector

    International Nuclear Information System (INIS)

    Mwandosya, M.J.

    1990-01-01

    The oil sector is strategic in any nation's endeavor for development. Disruption of oil supplies leads to a disruption in all sectors of the economy. In addition, by holding a prerogative over technical knowledge, the multinational oil companies have strengthened their influence. They have over time invested in research and development in exploration and refining, and have established a world-wide network of marketing systems. This paper provides a discussion of skill acquisition by indigenous people which is a discussion of the interface between the affiliates of these multinational companies, their corporate desires, and the efforts of emerging nations to control or at least monitor and regulate these affiliates

  19. Virginia Power's capacity acquisition program

    International Nuclear Information System (INIS)

    Carney, R.W.

    1991-01-01

    Virginia Power is a utility with a growing demand for electricity. To meet that growth it has embarked on an aggressive program to encourage the construction of privately-owned generating plants. In 1988 it conducted the largest competitive acquisition program by any utility to date. Virginia Power has retained the option to build plants if the bids it receives are too costly or do not meet the needs of its customers. This paper describes the situation at Virginia Power, the program it has implemented, and the capacity additions which are scheduled between 1989 and 1995

  20. Draft 1992 Resource Program : Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  1. Draft 1992 Resource Program : Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  2. The impact of a surgical boot camp on early acquisition of technical and nontechnical skills by novice surgical trainees.

    Science.gov (United States)

    Heskin, Leonie; Mansour, Ehab; Lane, Brian; Kavanagh, Dara; Dicker, Pat; Ryan, Donncha; Gildea-Byrne, Kate; Pawlikowska, Teresa; Tierney, Sean; Traynor, Oscar

    2015-09-01

    Acquisition of skills early in surgical training represents a significant challenge at present because of training time constraints. The aim of this study was to investigate if an intensive surgical boot camp was effective in transferring skills at the beginning of a surgical training program. New core surgical trainees (n = 58) took part in a 5-day boot camp. There were pretest and posttest assessments of knowledge, technical skills, and confidence levels. The boot camp used simulation and senior surgical faculty to teach a defined range of technical and nontechnical skills. The scores for knowledge (53.8% vs 68.4%, P technical skills (35.9% to 60.6% vs 50.6% to 78.2%, P Skills improvements were still present a year later. The 5-day surgical boot camp proved to be an effective way to rapidly acquire surgical knowledge and skills while increasing the confidence levels of trainees. Copyright © 2015 Elsevier Inc. All rights reserved.

  3. ATR Technical Specification Upgrade Program

    International Nuclear Information System (INIS)

    McCracken, R.T.; Durney, J.L.; Freund, G.A.

    1990-01-01

    The Advanced Test Reactor (ATR) is a 250 MW, uranium-aluminum fueled test reactor which began full power operation in 1969. The initial operation was controlled by an Operating Limits document based on the original Safety Analysis Report. Additional safety bases were later developed to support Technical Specifications which were approved and implemented in 1977. The Technical Specifications which were initially developed with content and format specified in ANSI/ANS--15.1, ''The Development of Technical Specifications for Research Reactors.'' The safety basis documentation and the Technical Specifications have been updated as required to maintain them current with the ATR facility configuration. All revisions have been made with a content, format and style consistent with the original. A major, two-phase program to upgrade the content, format and style is in progress. This paper describes the first phase of this program

  4. Middlesex Community College Software Technical Writing Program.

    Science.gov (United States)

    Middlesex Community Coll., Bedford, MA.

    This document describes the Software Technical Writing Program at Middlesex Community College (Massachusetts). The program is a "hands-on" course designed to develop job-related skills in three major areas: technical writing, software, and professional skills. The program was originally designed in cooperation with the Massachusetts High…

  5. Practice in development and utilization of program-technical complex (PTK) in in-reactor control systems

    International Nuclear Information System (INIS)

    Gribov, A.A.; Kuzil, A.C.; Padun, S.P.; Surnachov, S.I.; Jakovlev, G.V.

    2001-01-01

    Experience with the development and utilization of the program-technical complex PTK 'KRUIZ' is analyzed in the paper. A peculiarity of PTK is the orientation on acquisition, processing and diagnostics of signals from in-reactor sensors (thermocouples and SPD). The PTK 'KRUIZ' represents a new generation of tools open for further development, oriented specifically on the use in in-reactor control systems in modernized and built power units of the WWER type. In the PTK 'KRUIZ', methods, models and algorithms proved in nuclear power plants are used accounting for the utilization of up to date technical tools and systematic technical solutions. Experience with the use of basic elements of the PTK 'KRUIZ' at existing WWER reactors including peculiarities of temperature control in nuclear power plants are also dealt within the paper. (Authors)

  6. Low-level waste management program: technical program overview

    International Nuclear Information System (INIS)

    Lowrie, R.S.

    1981-01-01

    The mission of the technical program is to develop the technology component of the Department of Energy's Low-Level Waste Management Program and to manage research and development, demonstration, and documentation of the technical aspects of the program. Some of the major technology objectives are: develop and demonstrate techniques for waste generation reduction; develop and demonstrate waste treatment, handling and packaging techniques; develop and demonstrate the technology for greater confinement; and develop the technology for remedial action at existing sites. In addition there is the technology transfer objective which is to compile and issue a handbook documenting the technology for each of the above technology objectives

  7. Information management architecture for an integrated computing environment for the Environmental Restoration Program. Environmental Restoration Program, Volume 3, Interim technical architecture

    International Nuclear Information System (INIS)

    1994-09-01

    This third volume of the Information Management Architecture for an Integrated Computing Environment for the Environmental Restoration Program--the Interim Technical Architecture (TA) (referred to throughout the remainder of this document as the ER TA)--represents a key milestone in establishing a coordinated information management environment in which information initiatives can be pursued with the confidence that redundancy and inconsistencies will be held to a minimum. This architecture is intended to be used as a reference by anyone whose responsibilities include the acquisition or development of information technology for use by the ER Program. The interim ER TA provides technical guidance at three levels. At the highest level, the technical architecture provides an overall computing philosophy or direction. At this level, the guidance does not address specific technologies or products but addresses more general concepts, such as the use of open systems, modular architectures, graphical user interfaces, and architecture-based development. At the next level, the technical architecture provides specific information technology recommendations regarding a wide variety of specific technologies. These technologies include computing hardware, operating systems, communications software, database management software, application development software, and personal productivity software, among others. These recommendations range from the adoption of specific industry or Martin Marietta Energy Systems, Inc. (Energy Systems) standards to the specification of individual products. At the third level, the architecture provides guidance regarding implementation strategies for the recommended technologies that can be applied to individual projects and to the ER Program as a whole

  8. Incidental Foreign-Language Acquisition by Children Watching Subtitled Television Programs

    Science.gov (United States)

    Ina, Lekkai

    2014-01-01

    Series of international studies have shown that subtitled television programs provide a rich context for foreign language acquisition. This study investigated whether incidental language acquisition occurs from watching a television program with/without subtitles. Children in the experimental conditions watch: (a) a 15 minute snapshot of a well…

  9. Defense Acquisitions: Assessments of Selected Weapon Programs

    Science.gov (United States)

    2017-03-01

    Figure 17: Examples of Knowledge Scorecards 61 Page vi GAO-17-333SP Assessments of Selected Weapon Programs...programs. Page 61 GAO-17-333SP Assessments of Selected Weapon Programs Figure 17: Examples of Knowledge Scorecards Pursuant to a...had direct access to the USD AT&L and other senior acquisition officials, and some approval authorities were delegated to lower levels. For example

  10. Development of signal acquisition device of rotating coil measurement system

    International Nuclear Information System (INIS)

    Zhou Jianxin; Li Li; Kang Wen; Deng Chengdong; Yin Baogui; Fu Shinian

    2013-01-01

    A new rotating coil magnetic measurement system using the technical solution of the combination of a dynamic signal acquisition card and software with specific functions was developed. The acquisition device of the system successfully implemented the function of the PDI-5025 integrator. The sampling rate, the range, the accuracy and the flexibility of the system were improved. The development program of signal acquisition equipment, the realization of the acquisition function and the reliability and stability of the system were introduced. (authors)

  11. Electron beam fusion data acquisition program DATAIN (EBD)

    International Nuclear Information System (INIS)

    Boyer, W.B.

    1977-02-01

    This report describes the e beam automatic data acquisition program DATAIN. The program was written for a Modular Computer Systems Modcomp II computer interfaced to Tektronix R7912 Transient Digitizers. Operator Communications and data handling steps are described

  12. Procurement activities required by the nuclear program developed by nuclearelectrica national company- technical issues versus public acquisitions legal issues

    International Nuclear Information System (INIS)

    Vatamanu, Mariana

    2007-01-01

    Public procurement is one of the areas of the single market where the results of the liberalization drive have not yet measured up to expectations. This communication presents some technical issues versus public acquisition legal issues and suggests ways and means of improving contract award procedures. Procurement area includes the acquisition of goods, services and works, thus assumption not only for purchasing equipment, components, spare-parts or materials, but also hiring of the contractors or consultants to carry out services and works. Procurement is related to the function of management of supply, which encompasses aside range of planning function, coding and classification, stockholding policies, store-keeping, stores accounting, etc. but it is also related to the hiring of contractors or consultants for work or services. As an answer to the challenge of the increasing market globalization it has been developed the ISO quality system, within 9000 family of standards. The very intensive competition for all market clients, either locally or globally, encouraged development of a new concept of quality management systems. Due to its specificity of activity and with respect to the rules and legislation requirements imposed either by the internal Romanian Laws and Regulations or/and by international market rules and constrains, the development, construction and operation of a Nuclear Power Plant shall be performed in a controlled condition and based on specific authorizations obtained by the Owner of the NPP from the Romanian Regulatory Authorities. The experience, accumulated by over 10 years of operation of Cernavoda NPP Unit 1 by our company, demonstrates the high importance of the Quality Management System that imposes the quality of the components installed on the plant, the services and the works developed to assure a safety operation of the nuclear unit, with a strongly dependence by the procurement system established for purchasing of goods, services and

  13. ALICE - A computer program for nuclear data acquisition

    International Nuclear Information System (INIS)

    Skaali, T.B.

    1981-02-01

    This manual contains the users guide and the program documentation for the ALICE data acquisition system. The ALICE Users Guide, which is contained in part 1 of the manual, can be read independently of the program documentation in part 2. The ALICE program is written in the interpretive language NODAL. Due to the inherent slow execution speed of interpreted code time-consuming tasks such as non-linear least squares peak fitting cannot be implemented. On the other hand the special features of the NODAL language have made possible facilities in ALICE which hardly could have been realized by, e.g. a FORTRAN program. The complete system can be divided in two parts, i) the ALICE program written in NODAL, and ii) a data acquisition package which logically represents an extension of the SINTRAN III operating system. The system is thus portable to other NORD- 10/100 installations provided that the floating hardware is 48 bits. (Auth.)

  14. Summary of DOD Acquisition Program Audit Coverage

    National Research Council Canada - National Science Library

    2001-01-01

    This report will provide the DoD audit community with information to support their planning efforts and provide management with information on the extent of audit coverage of DoD acquisition programs...

  15. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  16. 77 FR 12930 - Federal Acquisition Regulation: Socioeconomic Program Parity

    Science.gov (United States)

    2012-03-02

    ... (SDVOSB) Program, or the Women-Owned Small Business (WOSB) Program. DATES: Effective Date: April 2, 2012...) Program (see subpart 19.14); or (iv) Women-Owned Small Business (WOSB) Program (see subpart 19.15). (3... amending the Federal Acquisition Regulation (FAR) to implement a section of the Small Business Jobs Act of...

  17. Implementing Effective Affordability Constraints for Defense Acquisition Programs

    Science.gov (United States)

    2014-03-01

    version that appears in the Pentagon Digital Library at http://www.whs.mil/library/mildoc/DODD.html. See also Joe Ferrara , “DOD’s 5000 Documents...costs.16 E. MIDS MIDS is a multinational (United States, France, Germany, Italy , Spain) cooperative development program with U.S. Joint Service...Congressional Research Service, 15 January 2014. Ferrara , Joe. “DOD’s 5000 Documents: Evolution and Change in Defense Acquisition Policy.” Acquisition

  18. War-gaming application for future space systems acquisition part 2: acquisition and bidding war-gaming modeling and simulation approaches for FFP and FPIF

    Science.gov (United States)

    Nguyen, Tien M.; Guillen, Andy T.

    2017-05-01

    This paper describes cooperative and non-cooperative static Bayesian game models with complete and incomplete information for the development of optimum acquisition strategies associated with the Program and Technical Baseline (PTB) solutions obtained from Part 1 of this paper [1]. The optimum acquisition strategies discussed focus on achieving "Affordability" by incorporating contractors' bidding strategies into the government acquisition strategies for acquiring future space systems. The paper discusses System Engineering (SE) frameworks, analytical and simulation approaches and modeling for developing the optimum acquisition strategies from both the government and contractor perspectives for Firm Fixed Price (FFP) and Fixed Price Incentive Firm (FPIF) contract types.

  19. Feasibility of developing a portable driver performance data acquisition system for human factors research: Technical tasks. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Carter, R.J.; Barickman, F.S.; Spelt, P.F.; Schmoyer, R.L.; Kirkpatrick, J.R.

    1998-01-01

    A two-phase, multi-year research program entitled ``development of a portable driver performance data acquisition system for human factors research`` was recently completed. The primary objective of the project was to develop a portable data acquisition system for crash avoidance research (DASCAR) that will allow drive performance data to be collected using a large variety of vehicle types and that would be capable of being installed on a given vehicle type within a relatively short-time frame. During phase 1 a feasibility study for designing and fabricating DASCAR was conducted. In phase 2 of the research DASCAR was actually developed and validated. This technical memorandum documents the results from the feasibility study. It is subdivided into three volumes. Volume one (this report) addresses the last five items in the phase 1 research and the first issue in the second phase of the project. Volumes two and three present the related appendices, and the design specifications developed for DASCAR respectively. The six tasks were oriented toward: identifying parameters and measures; identifying analysis tools and methods; identifying measurement techniques and state-of-the-art hardware and software; developing design requirements and specifications; determining the cost of one or more copies of the proposed data acquisition system; and designing a development plan and constructing DASCAR. This report also covers: the background to the program; the requirements for the project; micro camera testing; heat load calculations for the DASCAR instrumentation package in automobile trunks; phase 2 of the research; the DASCAR hardware and software delivered to the National Highway Traffic Safety Administration; and crash avoidance problems that can be addressed by DASCAR.

  20. NWMO transportation technical work program

    International Nuclear Information System (INIS)

    Hatton, C.

    2015-01-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  1. NWMO transportation technical work program

    Energy Technology Data Exchange (ETDEWEB)

    Hatton, C. [Nuclear Waste Management Organization, Toronto, ON (Canada)

    2015-07-01

    This paper describes technical work program for the transportation nuclear waste by the Nuclear Waste Management Organization (NWMO). Transportation work program involves risk assessment which under normal conditions involves dose assessment to the worker and the public as well as consideration of transportation system routing and operations. It also involves possible accident scenarios using forensic modelling and probability analysis.

  2. Deliberating A Contract Type Based Risk Mitigation Strategy For South African Defense Acquisitions

    Science.gov (United States)

    2016-06-01

    cash flow may lead to cost overruns and schedule slippage. Table 1 shows the description, schedule and cost performance status for two SA DOD...possibility of applying a contract-type based strategy to manage acquisition program costs and schedule risks for the South African (SA) Department of...deviations between technical, cost and schedule performance. 14. SUBJECT TERMS acquisition process, defense acquisition, contract-type, risk

  3. A higher level language data acquisition system (III) - the user data acquisition program

    International Nuclear Information System (INIS)

    Finn, J.M.; Gulbranson, R.L.; Huang, T.L.

    1983-01-01

    The nuclear physics group at the University of Illinois has implemented a data acquisition system using modified versions of the Concurrent Pascal and Sequential Pascal languages. The user, a physicist, develops a data acquisition ''operating system'', written in these higher level languages, which is tailored to the planned experiment. The user must include only those system functions which are essential to the task, thus improving efficiency. The user program is constructed from simple modules, mainly consisting of Concurrent Pascal PROCESSes, MONITORs, and CLASSes together with appropriate data type definitions. Entire programs can be put together using ''cut and paste'' techniques. Planned enhancements include the automating of this process. Systems written for the Perkin-Elmer 3220 using this approach can easily exceed 2 kHz data rates for event by event handling; 20 kHz data rates have been achieved by the addition of buffers in the interrupt handling software. These rates have been achieved without the use of special-purpose hardware such as micro-programmed branch drivers. With the addition of such devices even higher data rates should be possible

  4. 48 CFR 212.211 - Technical data.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Technical data. 212.211 Section 212.211 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT... Acquisition of Commercial Items 212.211 Technical data. The DoD policy for acquiring technical data for...

  5. Technical specification optimization program - engineered safety features

    International Nuclear Information System (INIS)

    Andre, G.R.; Jansen, R.L.

    1986-01-01

    The Westinghouse Technical Specification Program (TOP) was designed to evaluate on a quantitative basis revisions to Nuclear Power Plant Technical Specifications. The revisions are directed at simplifying plant operation, and reducing unnecessary transients, shutdowns, and manpower requirements. In conjunction with the Westinghouse Owners Group, Westinghouse initiated a program to develop a methodology to justify Technical Specification revisions; particularly revisions related to testing and maintenance requirements on plant operation for instrumentation systems. The methodology was originally developed and applied to the reactor trip features of the reactor protection system (RPS). The current study further refined the methodology and applied it to the engineered safety features of the RPS

  6. Technical progress report for the quarter 1 October-31 December 1980

    International Nuclear Information System (INIS)

    1981-01-01

    This report describes the technical accomplishments on the commercial nuclear waste management programs and on the geologic disposal of nuclear wastes. The program is organized into eight tasks: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management

  7. Acquisition Research Program: Creating Synergy for Informed Change

    National Research Council Canada - National Science Library

    Greene, James

    2007-01-01

    .... In doing so, the program will prepare the DOD workforce to participate in the continued evolution of the defense acquisition process and collaborate with other universities, think tanks, industry...

  8. Solid Waste Program technical baseline description

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, A.B.

    1994-07-01

    The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.

  9. Subseabed-disposal program: systems-analysis program plan

    International Nuclear Information System (INIS)

    Klett, R.D.

    1981-03-01

    This report contains an overview of the Subseabed Nuclear Waste Disposal Program systems analysis program plan, and includes sensitivity, safety, optimization, and cost/benefit analyses. Details of the primary barrier sensitivity analysis and the data acquisition and modeling cost/benefit studies are given, as well as the schedule through the technical, environmental, and engineering feasibility phases of the program

  10. Technical progress report for the quarter 1 October-31 December 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    This report describes the technical accomplishments on the commercial nuclear waste management programs and on the geologic disposal of nuclear wastes. The program is organized into eight tasks: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management. (DLC)

  11. 1996 DOE technical standards program workshop: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    The workshop theme is `The Strategic Standardization Initiative - A Technology Exchange and Global Competitiveness Challenge for DOE.` The workshop goal is to inform the DOE technical standards community of strategic standardization activities taking place in the Department, other Government agencies, standards developing organizations, and industry. Individuals working on technical standards will be challenged to improve cooperation and communications with the involved organizations in response to the initiative. Workshop sessions include presentations by representatives from various Government agencies that focus on coordination among and participation of Government personnel in the voluntary standards process; reports by standards organizations, industry, and DOE representatives on current technology exchange programs; and how the road ahead appears for `information superhighway` standardization. Another session highlights successful standardization case studies selected from several sites across the DOE complex. The workshop concludes with a panel discussion on the goals and objectives of the DOE Technical Standards Program as envisioned by senior DOE management. The annual workshop on technical standards has proven to be an effective medium for communicating information related to standards throughout the DOE community. Technical standards are used to transfer technology and standardize work processes to produce consistent, acceptable results. They provide a practical solution to the Department`s challenge to protect the environment and the health and safety of the public and workers during all facility operations. Through standards, the technologies of industries and governments worldwide are available to DOE. The DOE Technical Standards Program, a Department-wide effort that crosscuts all organizations and disciplines, links the Department to those technologies.

  12. 75 FR 13521 - Centers for Independent Living Program-Training and Technical Assistance

    Science.gov (United States)

    2010-03-22

    ... DEPARTMENT OF EDUCATION Centers for Independent Living Program--Training and Technical Assistance... for Independent Living Program--Training and Technical Assistance (CIL-TA program). The Assistant... appropriated for the CIL program to provide training and technical assistance to CILs, agencies eligible to...

  13. Technical Skill Attainment and Post-Program Outcomes: An Analysis of Pennsylvania Secondary Career and Technical Education Graduates

    Science.gov (United States)

    Staklis, Sandra; Klein, Steven

    2010-01-01

    Since the mid-1990s, the Pennsylvania Department of Education (PDE) has required all students concentrating in career and technical education (CTE) programs to complete a standardized technical skill assessment at or near the end of their program. Results of technical skill assessments are used for a number of purposes, including recognizing…

  14. Process monitoring using a Quality and Technical Surveillance Program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a Quality and Technical Surveillance Program was to help ensure manufactured clad vents sets fully met technical and quality requirements established by the manufacturer and the customer, and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The Quality and Technical Surveillance Program provided a planned, scheduled approach to monitor key processes and documentation illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated

  15. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  16. 48 CFR 12.211 - Technical data.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Technical data. 12.211... ACQUISITION OF COMMERCIAL ITEMS Special Requirements for the Acquisition of Commercial Items 12.211 Technical data. Except as provided by agency-specific statutes, the Government shall acquire only the technical...

  17. Evaluation Study of VTAE Wood Technics Programs.

    Science.gov (United States)

    Wisconsin State Board of Vocational, Technical, and Adult Education, Madison.

    A survey of former students of the Wisconsin Vocational, Technical, and Adult Education (VTAE) wood technics programs and employers in woodworking industries was conducted during spring of 1985. General objectives were to determine job classifications, types of businesses, and relative importance of tasks or duties in various woodworking-related…

  18. Technical Performance Assessment: Mission Success in Software Acquisition Management

    Science.gov (United States)

    2010-04-27

    Examples Design constraints make software acquisition and development t l iti lex reme y cr ca Application domain – Operational Flight Program, Air...environment – used to produce the software Ri k t t bli h d d i t i d i k ts managemen – es a s e an ma n a ne r s managemen systems Milestone reviews...Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that

  19. Training for Technical Assistants: Technical Assistance Program

    Science.gov (United States)

    1986-09-01

    shortage of technical ptfesson until such time as English , "speking instructors might be trained, There. would be An aumcation of committed on-calI...12 hours in classroom Instruction, students in English as a Second nel Research and Development Computer.taught students Language. The program Is...hbeels "p.-ogram. A Iot ’ atar boiler arn tank heats týe food enroute to its destination. 1.0. A new tor of dust ptectleon to protect machine .perators

  20. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  1. 75 FR 38833 - Walker River Basin Acquisition Program

    Science.gov (United States)

    2010-07-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Walker River Basin Acquisition Program AGENCY... (Reclamation) is canceling work on the Environmental Impact Statement (EIS) for the Walker River Basin... Walker River, primarily for irrigated agriculture, have resulted in a steadily declining surface...

  2. Risk-based technical specifications program: Site interview results

    International Nuclear Information System (INIS)

    Andre, G.R.; Baker, A.J.; Johnson, R.L.

    1991-08-01

    The Electric Power Research Institute and Pacific Gas and Electric Company are sponsoring a program directed at improving Technical Specifications using risk-based methods. The major objectives of the program are to develop risk-based approaches to improve Technical Specifications and to develop an Interactive Risk Advisor (IRA) prototype. The IRA is envisioned as an interactive system that is available to plant personnel to assist in controlling plant operation. Use of an IRA is viewed as a method to improve plant availability while maintaining or improving plant safety. In support of the program, interviews were conducted at several PWR and BWR plant sites, to elicit opinions and information concerning risk-based approaches to Technical Specifications and IRA requirements. This report presents the results of these interviews, including the functional requirements of an IRA. 2 refs., 6 figs., 2 tabs

  3. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  4. An adaptive structure data acquisition system using a graphical-based programming language

    Science.gov (United States)

    Baroth, Edmund C.; Clark, Douglas J.; Losey, Robert W.

    1992-01-01

    An example of the implementation of data fusion using a PC and a graphical programming language is discussed. A schematic of the data acquisition system and user interface panel for an adaptive structure test are presented. The computer programs (a series of icons 'wired' together) are also discussed. The way in which using graphical-based programming software to control a data acquisition system can simplify analysis of data, promote multidisciplinary interaction, and provide users a more visual key to understanding their data are shown.

  5. Experimental Facilities Division/User Program Division technical progress report 1999-2000

    International Nuclear Information System (INIS)

    2001-01-01

    In October 1999, the two divisions of the Advanced Photon Source (APS), the Accelerator Systems Division (ASD) and the Experimental Facilities Division (XFD), were reorganized into four divisions (see high-level APS organizational chart, Fig. 1.1). In addition to ASD and XFD, two new divisions were created, the APS Operations Division (AOD), to oversee APS operations, and the User Program Division (UPD), to serve the APS user community by developing and maintaining the highest quality user technical and administration support. Previous XFD Progress Reports (ANL/APS/TB-30 and ANL/APS/TB-34) covered a much broader base, including APS user administrative support and what was previously XFD operations (front ends, interlocks, etc.) This Progress Report summarizes the main scientific and technical activities of XFD, and the technical support, research and development (R and D) activities of UPD from October 1998 through November 2000. The report is divided into four major sections, (1) Introduction, (2) SRI-CAT Beamlines, Technical Developments, and Scientific Applications, (3) User Technical Support, and (4) Major Plans for the Future. Sections 2 and 3 describe the technical activities and research accomplishments of the XFD and UPD personnel in supporting the synchrotron radiation instrumentation (SRI) collaborative access team (CAT) and the general APS user community. Also included in this report is a comprehensive list of publications (Appendix 1) and presentations (Appendix 2) by XFD and UPD staff during the time period covered by this report. The organization of section 2, SRI CAT Beamlines, Technical Developments, and Scientific Applications has been made along scientific techniques/disciplines and not ''geographical'' boundaries of the sectors in which the work was performed. Therefore items under the subsection X-ray Imaging and Microfocusing could have been (and were) performed on several different beamlines by staff in different divisions. The management of

  6. Foreign Assistance: Treasury's Technical Assistance Program

    National Research Council Canada - National Science Library

    Ford, Jess

    1999-01-01

    After the collapse of communism in Central Europe and the dissolution of the Soviet Union, the United States developed programs of technical assistance to help countries transition to market economies and democracy...

  7. TMI-2 accident evaluation program sample acquisition and examination plan. Executive summary

    International Nuclear Information System (INIS)

    Russell, M.L.; McCardell, R.K.; Broughton, J.M.

    1985-12-01

    The purpose of the TMI-2 Accident Evaluation Program Sample Acquisition and Examination (TMI-2 AEP SA and E) program is to develop and implement a test and inspection plan that completes the current-condition characterization of (a) the TMI-2 equipment that may have been damaged by the core damage events and (b) the TMI-2 core fission product inventory. The characterization program includes both sample acquisitions and examinations and in-situ measurements. Fission product characterization involves locating the fission products as well as determining their chemical form and determining material association

  8. 48 CFR 470.202 - Acquisition of commodities for United States Agency for International Development (USAID) programs.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Acquisition of commodities... Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE FOOD ASSISTANCE PROGRAMS COMMODITY...) programs. (a) Lowest landed cost and delivery considerations. (1) Except as provided in paragraphs (a)(3...

  9. Identifying Enterprise Leverage Points in Defense Acquisition Program Performance

    Science.gov (United States)

    2009-09-01

    differentiated . [108] Table 1: Table of Validation and Approval Authority5 Beyond the major categories used for programs as noted above, there is also a...impossible to identify which “ uber -portfolio” a system should belong to as many “portfolios” claim a system as an integral part of the larger portfolio...to differentiate between programs. DOD 5002, Enclosure E states “A technology project or acquisition program shall be categorized based on its

  10. Technical considerations in snubber reduction programs

    International Nuclear Information System (INIS)

    Longo, D.L.; Kitz, G.T.

    1989-01-01

    Snubber reduction has been a much discussed topic for the past several years. The advantages to the owner in terms of reduced radiation exposure, lower operating costs, and better plant maintainability are obvious but difficult to quantify. The costs associated with performing a snubber reduction program can be quantified, but can vary widely depending on how the program is implemented. One approach is to divide the scope of the work into several parts, based on similarities and differences of the plant systems and technical requirements. for example, for this program, the work was divided into three parts: nuclear steam supply system, torus-attached piping, and balance of plant. This approach facilitates addressing the variations in design requirements and the variations in snubber removal priorities that are related to each plant segment. It also allows the experience gained in the first part to be applied to the subsequent parts. This paper describes one utility's experience in successfully completing two parts of a three-part snubber reduction program and focuses on the various technical issues that must be addressed along with those areas where the utility should establish checkpoints that are critical to the success of the overall program. It also describes how the experience from the first two parts will be factored into the final part of the snubber reduction program

  11. Process monitoring using a quality and technical surveillance program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a quality and technical surveillance program was to help ensure that manufactured clad went sets fully met technical and quality requirements established by the manufacturer and the customer and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The quality and technical surveillance program provided a planned, scheduled approach to monitor key processes and documentation and certification systems to prevent noncompliances or any manufacturing discrepancies. These surveillances illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated. copyright 1995 American Institute of Physics

  12. Globalizing Technical Communication Programs: Visions, Challenges, and Emerging Directions

    DEFF Research Database (Denmark)

    Maylath, Bruce; Mousten, Birthe; Vandepitte, Sonia

    Speakers Maylath, Mousten and Vandepitte, co-authors of two chapters on what they call the Trans-Atlantic Project, will describe the programmatic framework for establishing the collaborative partnerships in which students studying technical writing in the U.S. work with students studying...... help achieve common program objectives, particularly in regard to intercultural negotiation and mediation processes. In addition, they will describe how they met course-specific objectives. For the technical writing course, such objectives included broadening students' awareness of the needs of readers...... translation in Europe to create procedural documents in Danish, Dutch, English, French, German and/or Italian. They will provide guidelines for  how international partnerships of this kind can be established between technical communication programs and translation programs anywhere, even in the abscence...

  13. Laboratory technical services provides business opportunities for supervisory control and data acquisition systems

    International Nuclear Information System (INIS)

    Ballard, W.

    1994-01-01

    The author presents some additional information about what he considers are some really great opportunities for the business community to participate in developing the greatest scientific project in the history of mankind. Facility Engineering Services is part of Laboratory Technical Services. As part of this group, it has the responsibility to direct the construction of interim facilities, scientific labs, production process, cooling towers, cooling ponds and the operation and control of SSC Laboratory conventional support systems. These operations and controls will be accomplished through the employment of a Supervisory Control and Data Acquisition system (SCADA)

  14. Energy resources technical training and development programs for American Indians

    Energy Technology Data Exchange (ETDEWEB)

    Cameron, R E; White, W S

    1978-08-01

    Because of the energy resources located on Native American owned lands, it is pertinent that the tribes on these reservations receive information, training, and technical assistance concerning energy and the environment and the decisions that must be made about energy-resource development. In the past, attempts to enlist Indians in technical-assistance programs met with little success because teaching methods seldom incorporated program planning by both tribal leaders and the technical training staff. Several technical-assistance programs given on reservations in the central and western parts of the country were conducted by Argonne National Lab.--programs that stressed practical, on-the-job experience through lecture, laboratory, and field studies. Each program was designed by ANL and tribal leaders to fit the needs and concerns of a particular tribe for its environment. The individual programs met with an impressive degree of success; they also prompted several Indians to pursue this type of education further at ANL and local Indian community colleges and to obtain funds for energy projects. Despite the positive feedback, several difficulties were encountered. Among them are the necessity to continually modify the programs to fit diverse tribal needs, to diminish politically motivated interference, and to increase portions of the funding to involve more Native Americans.

  15. Scandal and Tragedy Or Acquisition Lessons Relearned by the F-35 Program

    Science.gov (United States)

    2017-01-01

    Extend decontamination tests O — GAO 05—Establish an executable program consistent with best practices and DoD poli - cy regarding knowledge-based...Crawley, E. F. (2012). Relieving joint pain : Planning government acquisition of complex common systems. Defense Acquisition Research Journal, 19

  16. 1994 DOE Technical Standards Program Workshop: Proceedings

    International Nuclear Information System (INIS)

    Spellman, D.J.

    1994-01-01

    The DOE Technical Standards Program has been structured to provide guidance and assistance for the development, adoption, and use of voluntary standards within the Department. OMB Circular A-119, ''Federal Participation in the Development and Use of Voluntary Standards'' establishes the policy to be followed in working with voluntary standards bodies, and in adopting and using voluntary standards whenever feasible. The DOE Technical Standards Program is consistent with this policy and is dedicated to the task of promoting its implementation. The theme of this year's workshop is ''Standards Initiatives in Environmental Management fostering the development and use of industry standards for safe, environmentally responsible operations.'' The objective of the workshop is to increase the participant's awareness of the standardization activities taking place nationally and internationally and the impact of these activities on their efforts, and to facilitate the exchange of experiences, processes, and tools for implementing the program. Workshop sessions will include presentations by industry and Government notables in the environment, safety, and health arena with ample opportunity for everyone to ask questions and share experiences. There will be a breakout session which will concentrate on resolution of issues arising from the implementation of the DOE Technical Standards Program and a plenary session to discuss the plans developed by the breakout groups. Many organizations provide services and products which support the development, processing, distribution, and retrieval of standards. Those organizations listed at the end of the agenda will have exhibits available for your perusal throughout the workshop. Last year's workshop was very successful in stimulating an understanding of an interest in the standards program. This year, we hope to build on that success and provide an environment for the synergism of ideas to enhance the program and advance its implementation

  17. Energy Economic Data Base (EEDB) Program. Technical Reference Book

    International Nuclear Information System (INIS)

    Allen, R.E.; Benedict, R.G.; Hodson, J.S.

    1983-09-01

    Purpose of the program is to develop current technical and cost information for nuclear and comparison electric power generating stations. Purpose of this Technical Reference Book is to provide the current technical design bases for each of the technical data models updated in the Sixth Update (1983). It contains a set of detailed system design descriptions for these technical data models, which are supplemented with engineering drawings. The system design descriptions reflect regulatory and industry practice and experience for nuclear and coal-fired power generating stations that are current for January 1, 1983

  18. Analysis of Defense Industry Consolidation Effects on Program Acquisition Costs

    National Research Council Canada - National Science Library

    Hoff, Russell V

    2007-01-01

    .... This thesis examines whether cost changes are evident following consolidation within the defense industry by conducting a regression analysis of Major Defense Acquisition Programs across 13 broad defense market sectors...

  19. What You Should Get from a Professionally Oriented Master's Degree Program in Technical Communication.

    Science.gov (United States)

    Carliner, Saul

    1992-01-01

    Cites reasons for pursuing a curriculum in technical communication, lists objectives a program should achieve, and outlines a four-part program that includes theory, professional skills, technical proficiency, and an internship. Lists schools offering programs in technical communication. (SR)

  20. 48 CFR 227.7104 - Contracts under the Small Business Innovation Research (SBIR) Program.

    Science.gov (United States)

    2010-10-01

    ... Business Innovation Research (SBIR) Program. 227.7104 Section 227.7104 Federal Acquisition Regulations... Data and Computer Software—Small Business Innovation Research (SBIR) Program, when technical data or... PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7104 Contracts under the Small Business...

  1. Adding Realism to Technical Drafting Programs

    Science.gov (United States)

    Weaver, Gerald L.

    1976-01-01

    Suggestions for improved, relevant technical drafting programs are presented: (1) making realistic assignments, (2) viewing real projects, (3) duplicating industrial projects, (4) practicing lettering, (5) conducting research, (6) engaging in teamwork, (7) adapting to change, (8) learning to meet deadlines, and (9) stressing the importance of…

  2. Training and qualification program for nuclear criticality safety technical staff

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1996-01-01

    A training and qualification program for nuclear criticality safety technical staff personnel has been developed and implemented. The program is compliant with requirements and provides evidence that a systematic approach has been taken to indoctrinate new technical staff. Development involved task analysis to determine activities where training was necessary and the standard which must be attained to qualify. Structured mentoring is used where experienced personnel interact with candidates using checksheets to guide candidates through various steps and to provide evidence that steps have been accomplished. Credit can be taken for the previous experience of personnel by means of evaluation boards which can credit or modify checksheet steps. Considering just the wealth of business practice and site specific information a new person at a facility needs to assimilate, the program has been effective in indoctrinating new technical staff personnel and integrating them into a productive role. The program includes continuing training

  3. The acquisition of dangerous biological materials: Technical facts sheets to assist risk assessments of 46 potential BW agents

    Energy Technology Data Exchange (ETDEWEB)

    Aceto, Donato Gonzalo [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Astuto-Gribble, Lisa M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gaudioso, Jennifer M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2007-11-01

    Numerous terrorist organizations have openly expressed interest in producing and deploying biological weapons. However, a limiting factor for many terrorists has been the acquisition of dangerous biological agents, as evidenced by the very few successful instances of biological weapons use compared to the number of documented hoaxes. Biological agents vary greatly in their ability to cause loss of life and economic damage. Some agents, if released properly, can kill many people and cause an extensive number of secondary infections; other agents will sicken only a small number of people for a short period of time. Consequently, several biological agents can potentially be used to perpetrate a bioterrorism attack but few are likely capable of causing a high consequence event. It is crucial, from a US national security perspective, to more deeply understand the likelihood that terrorist organizations can acquire the range of these agents. Few studies have attempted to comprehensively compile the technical information directly relevant to the acquisition of dangerous bacteria, viruses and toxins. In this report, technical fact sheets were assembled for 46 potentially dangerous biological agents. Much of the information was taken from various research sources which could ultimately and significantly expedite and improve bioterrorism threat assessments. By systematically examining a number of specific agent characteristics included in these fact sheets, it may be possible to detect, target, and implement measures to thwart future terrorist acquisition attempts. In addition, the information in these fact sheets may be used as a tool to help laboratories gain a rudimentary understanding of how attractive a method laboratory theft is relative to other potential acquisition modes.

  4. Contract Source Selection: An Analysis of Lowest Price Technically Acceptable and Tradeoff Strategies

    Science.gov (United States)

    2016-06-15

    using- spss - statistics.php Lamoureux, J., Murrow, M., & Walls, C. (2015). Relationship of source selection methods to contract outcomes: an analysis ...Contract Source Selection: an Analysis of Lowest Price Technically Acceptable and Tradeoff Strategies 15 June 2016 LCDR Jamal M. Osman, USN...ACQUISITION RESEARCH PROGRAM SPONSORED REPORT SERIES Contract Source Selection: an Analysis of Lowest Price Technically Acceptable and Tradeoff

  5. Technical Training: Technical Training Seminar

    CERN Multimedia

    2004-01-01

    Tuesday 30 March TECHNICAL TRAINING SEMINAR From 9:00 to 12:00 and from 13:00 to 16:00 hrs - Council Chamber, Salle B, Salle des Pas Perdus National Instruments (NI) on Tour 2004 Claudia Jüngel, Evrem Yarkin, Joel Clerc, Hervé Baour / NATIONAL INSTRUMENTS The special event NI on Tour 2004, run in Germany, Austria and Switzerland, will be at CERN on March 30. Technical seminars and free introductory courses will be offered all day long in the Council Chamber, Salle B, and Salle des Pas Perdus (buildings 61 and 503). Technical conferences: 09:00 - 12:00 Data acquisition systems on PCs. Industrial measurement and control techniques. 13:00 - 16:00 Advanced LabVIEW software and PXI instrumentation. Measuring instruments and system components for teststand automation. Introductory courses: 09:00 - 12:00 DIAdem: Data analysis and presentation 13:00 - 16:00 Data acquisition with LabVIEW Language: English and French Free special seminar. Registration is recommended with National Instruments Switzerland (please sp...

  6. Technical Training: Technical Training Seminar

    CERN Multimedia

    2004-01-01

    Tuesday 30 March TECHNICAL TRAINING SEMINAR From 9:00 to 12:00 and from 13:00 to 16:00 hrs - Council Chamber, Salle B, Salle des Pas Perdus National Instruments (NI) on Tour 2004 Claudia Jüngel, Evrem Yarkin, Joel Clerc, Hervé Baour / NATIONAL INSTRUMENTS The special event NI on Tour 2004, run in Germany, Austria and Switzerland, will be at CERN on March 30. Technical seminars and free introductory courses will be offered all day long in the Council Chamber, Salle B, and Salle des Pas Perdus (buildings 61 and 503). Technical conferences: 09:00 - 12:00 Data acquisition systems on PCs. Industrial measurement and control techniques. 13:00 - 16:00 Advanced LabVIEW software and PXI instrumentation. Measuring instruments and system components for teststand automation. Introductory courses: 09:00 - 12:00 DIAdem: Data analysis and presentation 13:00 - 16:00 Data acquisition with LabVIEW Language: English and French Free special seminar. Registration is recommended with National Instruments Swi...

  7. Low-level waste program technical strategy

    International Nuclear Information System (INIS)

    Bledsoe, K.W.

    1994-01-01

    The Low-Level Waste Technical Strategy document describes the mechanisms which the Low-Level Waste Program Office plans to implement to achieve its mission. The mission is to manage the receipt, immobilization, packaging, storage/disposal and RCRA closure (of the site) of the low-level Hanford waste (pretreated tank wastes) in an environmentally sound, safe and cost-effective manner. The primary objective of the TWRS Low-level waste Program office is to vitrify the LLW fraction of the tank waste and dispose of it onsite

  8. An Assessment of Early Competitive Prototyping for Major Defense Acquisition Programs

    Science.gov (United States)

    2016-04-30

    Executive ( CAE ). The MDA determines when programs move from one acquisition phase to the next by reviewing program accomplishments at the various...the M113 family of vehicles. The AMPV will come in five variants: general purpose, medical evacuation, medical treatment , mortar carrier and...System (EPS) Program Control and Planning Segment (CAPS). EPS will provide extremely high frequency, jam-resistant, and secure satellite communications

  9. Cassini RTG Program. Monthly technical progress report, 27 November--31 December 1995

    International Nuclear Information System (INIS)

    1996-01-01

    This monthly technical progress report provided information on the following tasks: spacecraft integration and liaison; engineering support; safety analysis; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment (GSE); RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, and reliability, and contractor acquired government owned (CAGO) property acquisition

  10. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  11. The Acquisition of Functional Planning- and Programming Knowledge: Diagnosis, Modeling, and User-Adapted Help

    OpenAIRE

    Möbus, Claus; Schröder, Olaf

    1993-01-01

    The topic of our project has been to empirically investigate and to model processes of the acquisition, utilization, and optimization of knowledge while working with the ABSYNT Problem Solving Monitor (PSM ). The ABSYNT PSM is designed to support the acquisition of basic functional programming concepts by supplying learners with individualized, adaptive online help and proposals. ABSYNT ("Abstract Syntax Trees") is a functional visual programming language developed in the project. The ABSYNT ...

  12. Technical progress report, 1 April-30 June 1981

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    This report describes the technical accomplishments during the quarter ending June 1981, on the commercial nuclear waste management programs under the direction of the Office of Nuclear Waste Isolation (ONWI). The ONWI program is organized into 8 tasks entitled: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management. Principal investigators in each of these areas have submitted summaries of quarterly highlights for inclusion in this report. Separate abstracts have been prepared for 5 of these tasks for inclusion in the Energy Data Base. (DMC)

  13. Acquisition of Cleanroom Research Equipment to Support Ongoing DoD Programs at ASU

    Science.gov (United States)

    2017-12-12

    research and to educate scientists and engineers in selected technical areas of importance to national defense. DURIP funding provides for the acquisition...infrastructure for nanotechnology discovery and innovation. The ASU NanoFab is one of the 16 sites in the new NSF National Nanotechnology ...National Nanotechnology Infrastructure Network (NNIN). NNCI sites provide researchers from academia, small and large companies and government labs with

  14. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  15. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  16. Technical basis and evaluation criteria for an air sampling/monitoring program

    International Nuclear Information System (INIS)

    Gregory, D.C.; Bryan, W.L.; Falter, K.G.

    1993-01-01

    Air sampling and monitoring programs at DOE facilities need to be reviewed in light of revised requirements and guidance found in, for example, DOE Order 5480.6 (RadCon Manual). Accordingly, the Oak Ridge National Laboratory (ORNL) air monitoring program is being revised and placed on a sound technical basis. A draft technical basis document has been written to establish placement criteria for instruments and to guide the ''retrospective sampling or real-time monitoring'' decision. Facility evaluations are being used to document air sampling/monitoring needs, and instruments are being evaluated in light of these needs. The steps used to develop this program and the technical basis for instrument placement are described

  17. 48 CFR 35.010 - Scientific and technical reports.

    Science.gov (United States)

    2010-10-01

    ... reports. (a) R&D contracts shall require contractors to furnish scientific and technical reports... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Scientific and technical reports. 35.010 Section 35.010 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION...

  18. Machinery health prognostics: A systematic review from data acquisition to RUL prediction

    Science.gov (United States)

    Lei, Yaguo; Li, Naipeng; Guo, Liang; Li, Ningbo; Yan, Tao; Lin, Jing

    2018-05-01

    Machinery prognostics is one of the major tasks in condition based maintenance (CBM), which aims to predict the remaining useful life (RUL) of machinery based on condition information. A machinery prognostic program generally consists of four technical processes, i.e., data acquisition, health indicator (HI) construction, health stage (HS) division, and RUL prediction. Over recent years, a significant amount of research work has been undertaken in each of the four processes. And much literature has made an excellent overview on the last process, i.e., RUL prediction. However, there has not been a systematic review that covers the four technical processes comprehensively. To fill this gap, this paper provides a review on machinery prognostics following its whole program, i.e., from data acquisition to RUL prediction. First, in data acquisition, several prognostic datasets widely used in academic literature are introduced systematically. Then, commonly used HI construction approaches and metrics are discussed. After that, the HS division process is summarized by introducing its major tasks and existing approaches. Afterwards, the advancements of RUL prediction are reviewed including the popular approaches and metrics. Finally, the paper provides discussions on current situation, upcoming challenges as well as possible future trends for researchers in this field.

  19. Technical Assistance and Program Support: DoD Historical Black Colleges and Universities and Minority Institutions Program

    National Research Council Canada - National Science Library

    Andrews, Aaron

    2003-01-01

    ... (His), the United Negro College Fund Special Programs developed and implemented a comprehensive technical assistance and infrastructure program This program has provided HBCUs, HSIs, TCUs, and MIs...

  20. The Evolution of a Science Project: A Preliminary System Dynamics Model of a Recurring Software-Reliant Acquisition Behavior

    Science.gov (United States)

    2012-07-01

    Complexity?” Proceedings of the Third Annual Conference on Software- Intensive Systems Acquisition, January 2004. [ Bandura 1986] Bandura , Albert ...Andrew P. Moore Christopher Alberts July 2012 TECHNICAL REPORT CMU/SEI-2012-TR-001 ESC-TR-2012-001 Acquisition Support Program http...an operational environment [ Bandura 1986]. Creating interactive experiential learning tools such as “flight simulators” for use in the classroom is

  1. NCSU reactor sharing program. Final technical report

    International Nuclear Information System (INIS)

    Perez, P.B.

    1997-01-01

    The Nuclear Reactor Program at North Carolina State University provides the PULSTAR Research Reactor and associated facilities to eligible institutions with support, in part, from the Department of Energy Reactor Sharing Program. Participation in the NCSU Reactor Sharing Program continues to increase steadily with visitors ranging from advance high school physics and chemistry students to Ph.D. level research from neighboring universities. This report is the Final Technical Report for the DOE award reference number DE-FG05-95NE38136 which covers the period September 30, 1995 through September 30, 1996

  2. Communication of technical information to lay audiences. [National Waste Terminal Storage (NWTS) program

    Energy Technology Data Exchange (ETDEWEB)

    Bowes, J.E.; Stamm, K.R.; Jackson, K.M.; Moore, J.

    1978-05-01

    One of the objectives of the National Waste Terminal Storage (NWTS) Program is to provide terminal storage facilities for commercial radioactive wastes in various geologic formations at multiple locations in the United States. The activities performed under the NWTS Program will affect regional, state, and local areas, and widespread public interest in this program is expected. Since a large part of the NWTS Program deals with technical information it was considered desirable to initiate a study dealing with possible methods of effectively transmitting this technical information to the general public. This study has the objective of preparing a state-of-the-art report on the communication of technical information to lay audiences. The particular task of communicating information about the NWTS Program to the public is discussed where appropriate. The results of this study will aid the NWTS Program in presenting to the public the quite diverse technical information generated within the program so that a widespread, thorough public understanding of the NWTS Program might be achieved. An annotated bibliography is included.

  3. History of the KC-10A Aircraft Acquisition

    Science.gov (United States)

    1988-04-01

    in other research reports or educational pursuits contingent upon the following stipulations: - Reproduction rights do not extend to any copyrighted...MAC, AFLC, and others) would create data for flight, maintenance, and technical data manuals, and evaluate human engineering factors. This testing...productio); ond deli.erme:; ra.. a fa:st rate and the acquisition program began to phase out.. The, total fleot gjrew to 52 aircraft, and del ivf , ics of th:ý

  4. RE/SPEC Inc. technical support to the Repository Technology Program

    International Nuclear Information System (INIS)

    Wagner, R.A.

    1992-06-01

    This report presents a summary of all RE/SPEC Inc. technical support activities to the Repository Technology Program (RTP) from September 1, 1988, through June 30, 1992. The RE/SPEC Inc. activities are grouped into the following categories: project management, project quality assurance (QA), performance assessment (PA), support of the Office of Civilian Radioactive Waste Management (OCRWM) through technical reviews and general assistance, participation in the Department of Energy (DOE) International Program, and code evaluation and documentation

  5. 76 FR 14572 - Federal Acquisition Regulation; Technical Amendments

    Science.gov (United States)

    2011-03-16

    ... Acquisition Regulations. List of Subjects in 48 CFR Parts 18, 19, and 52 Government procurement. Dated: March... in paragraph (b) by removing ``http:// www.whitehouse.gov/omb/procurement/guides/emergency_acquisitions_ guide.pdf'' and adding ``http://www.whitehouse.gov/sites/default/files/ omb/assets/procurement...

  6. Post-Acquisition IT Integration

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Yetton, Philip

    2013-01-01

    The extant research on post-acquisition IT integration analyzes how acquirers realize IT-based value in individual acquisitions. However, serial acquirers make 60% of acquisitions. These acquisitions are not isolated events, but are components in growth-by-acquisition programs. To explain how...... serial acquirers realize IT-based value, we develop three propositions on the sequential effects on post-acquisition IT integration in acquisition programs. Their combined explanation is that serial acquirers must have a growth-by-acquisition strategy that includes the capability to improve...... IT integration capabilities, to sustain high alignment across acquisitions and to maintain a scalable IT infrastructure with a flat or decreasing cost structure. We begin the process of validating the three propositions by investigating a longitudinal case study of a growth-by-acquisition program....

  7. A process for integrating public involvement into technical/social programs

    International Nuclear Information System (INIS)

    Wiltshire, S.; Williams, C.

    1994-01-01

    Good technical/social decisions--those that are technically sound and publicly acceptable--result from a planning process that considers consulting the public a basic part of the technical program, as basic as hiring a technical consultant to advise about new ideas in computer modeling. This paper describes a specific process for making public involvement an integral part of decision-making about high-level radioactive waste management, so that important technical, social, environmental, economic, and cultural information and values can be incorporated in a meaningful way in planning and carrying out a high-level waste management program or project. The process for integration must consider: (a) the decision or task for which public interaction is needed; (b) the people who should or will want to participate in the decision or task; (c) the goals or purposes of the communication or interaction--the agency's and the public's; (d) the kinds of information the public needs and that the agency needs in order to understand the relevant technical and social issues; and (e) the types of communication or involvement that best serve to meet the agency's and the public's goals

  8. An assessment of individualized technical ear training for audio production.

    Science.gov (United States)

    Kim, Sungyoung

    2015-07-01

    An individualized technical ear training method is compared to a non-individualized method. The efficacy of the individualized method is assessed using a standardized test conducted before and after the training period. Participants who received individualized training improved better than the control group on the test. Results indicate the importance of individualized training for acquisition of spectrum-identification and spectrum-matching skills. Individualized training, therefore, should be implemented by default into technical ear training programs used in audio production industry and education.

  9. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  10. A Hybrid System for Acquisition of and Access to the Data from Foundry Technical Standards

    Directory of Open Access Journals (Sweden)

    A. Macioł

    2007-07-01

    Full Text Available The growing importance of automatized systems for interchange of commercial and technical information prompts searching for new forms of knowledge modelling. One of the possible solutions presented in this article is the use of relational databases for acquisition of information comprised in technical standards and of a rule-based reasoning system providing access to these bases. The study describes the structure of a database created under the assumption that concepts describing knowledge will be recorded in data collecting system and not in relational schema. The user is free to define by himself the structure of the knowledge without the need of introducing any changes to the relational schema. At the same time, the reasoning system enables very efficient knowledge searching. At present, tests are carried out on a software operating on a MS SQL Server. The project work and test performance of the system confirm that the adopted assumptions have been right and correct. The development of a new interface is anticipated using internet techniques. As a next step, the information resources collected in the system will be successively expanded using also information sources other than the technical standards.

  11. THE OFFICE OF AEROSPACE RESEARCH SCIENTIFIC AND TECHNICAL INFORMATION PROGRAM

    Science.gov (United States)

    The document outlines the mission and organization of the Office of Aerospace Research (OAR), then describes how its principal product, scientific...effective technical information program, are documented by examples. The role of the Office of Scientific and Technical Information within OAR as performed

  12. Instrument and Survey Analysis Technical Report: Program Implementation Survey. Technical Report #1112

    Science.gov (United States)

    Alonzo, Julie; Tindal, Gerald

    2011-01-01

    This technical document provides guidance to educators on the creation and interpretation of survey instruments, particularly as they relate to an analysis of program implementation. Illustrative examples are drawn from a survey of educators related to the use of the easyCBM learning system. This document includes specific sections on…

  13. 75 FR 66686 - Defense Federal Acquisition Regulation Supplement; Balance of Payments Program Exemption for...

    Science.gov (United States)

    2010-10-29

    ... Federal Acquisition Regulation Supplement; Balance of Payments Program Exemption for Commercial... Balance of Payments Program for construction material that is commercial information technology. DATES... the Balance of Payments Program for commercial information technology to be used in overseas...

  14. Adaptive Competency Acquisition: Why LPN-to-ADN Career Mobility Education Programs Work.

    Science.gov (United States)

    Coyle-Rogers, Patricia G.

    Adaptive competencies are the skills required to effectively complete a particular task and are the congruencies (balance) between personal skills and task demands. The differences between the adaptive competency acquisition of students in licensed practical nurse (LPN) programs and associate degree nurse (ADN) programs were examined in a…

  15. 78 FR 46795 - Federal Acquisition Regulation; Technical Amendments

    Science.gov (United States)

    2013-08-01

    ... changes to the FAR. List of Subject in 48 CFR Parts 2, 22, and 52 Government procurement. Dated: July 26, 2013. William Clark, Acting Director, Office of Government-wide Acquisition Policy, Office of Acquisition Policy, Office of Government-wide Policy. Therefore, DoD, GSA, and NASA amend 48 CFR parts 2, 22...

  16. Defense Acquisition Research Journal: Strengthening Cost Consciousness, Professionalism, and Technical Excellence

    Science.gov (United States)

    2016-04-01

    USAF (Ret.) This research proposes a method to leverage the use of subjective service quality in both selecting contractors and managing their...acquisition programs? How could they improve their contractor policies and procedures in this area to enhance the benefits of global technology sourcing...3 In cr ea se t he C M ca p ac it y fo r th re at “V ic ti m R ig ht s & S up p o rt ” fo r th e vu ln er ab ili ty o f “V ic ti m

  17. 76 FR 18624 - Research, Technical Assistance and Training Programs: Notice of Final Circular

    Science.gov (United States)

    2011-04-04

    ... to FTA Circular 6100.1D, Research and Technical Assistance Training Program: Application Instructions... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Research, Technical Assistance and Training Programs: Notice of Final Circular AGENCY: Federal Transit Administration (FTA), DOT. ACTION...

  18. Programmer's guide to FFE: a fast front-end data-acquisition program

    International Nuclear Information System (INIS)

    Million, D.L.

    1983-05-01

    The Large Coil Test Facility project of the Fusion Energy Division has a data acquisition system which includes a large host computer and several small, peripheral front-end computers. The front-end processors handle details of data acquisition under the control of the host and pass data back to the host for storage. Some of the front ends are known as fast front ends and are required to collect a maximum of 64,000 samples each second. This speed and other hardware constraints resulted in a need for a stand-alone, assembly language task which could be downline loaded from the host system into the fast front ends. FFE (Fast Front End) was written to satisfy this need. It was written in the PDP-11 MACRO-11 assembly language for an LSI-11/23 processor. After the host loads the task into the front end, it controls the data acquisition process with a series of commands and parameters. This Programmer's Guide describes the structure and operation of FFE in detail from a programming point of view. A companion User's guide provides more information on the use of the program from the host system

  19. Early acquisition of non-technical skills using a blended approach to simulation-based medical education.

    Science.gov (United States)

    Coggins, Andrew; Desai, Mihir; Nguyen, Khanh; Moore, Nathan

    2017-01-01

    Non-technical skills are emerging as an important component of postgraduate medical education. Between 2013 and 2016, a new blended training program incorporating non-technical skills was introduced at an Australian university affiliated hospital. Program participants were medical officers in years 1 and 2 of postgraduate training. An interdisciplinary faculty trained in simulation-based education led the program. The blended approach combined open access online resources with multiple opportunities to participate in simulation-based learning. The aim of the study was to examine the value of the program to the participants and the effects on the wider hospital system. The mixed methods evaluation included data from simulation centre records, hospital quality improvement data, and a post-hoc reflective survey of the enrolled participants ( n  = 68). Over 30 months, 283 junior doctors were invited to participate in the program. Enrolment in a designated simulation-based course was completed by 169 doctors (59.7%). Supplementary revision sessions were made available to the cohort with a median weekly attendance of five participants. 56/68 (82.4%) of survey respondents reported increased confidence in managing deteriorating patients. During the period of implementation, the overall rate of hospital cardiac arrests declined by 42.3%. Future objectives requested by participants included training in graded assertiveness and neurological emergencies. Implementation of a non-technical skills program was achieved with limited simulation resources and was associated with observable improvements in clinical performance. The participants surveyed reported increased confidence in managing deteriorating patients, and the program introduction coincided with a significant reduction in the rate of in-hospital cardiac arrests.

  20. Independent Technical (open-quotes Red Teamclose quotes) Reviews

    International Nuclear Information System (INIS)

    Thullen, P.; Bennett, D.R.; Kosiewicz, S.T.; Weaver, D.L.

    1995-01-01

    Offices under the Assistant Secretary for Environmental Restoration and Waste Management (EM) in the Department of Energy (DOE) and some National Laboratories are using Independent Technical or open-quotes Red Teamclose quotes Reviews to understand and improve the performance of major projects, major system acquisitions, programs and organizations. A core group formed in 1991 by Los Alamos National Laboratory and Sandia National Laboratories, has organized teams of commercial and private consultants to perform over fifteen Independent Technical Reviews (ITRs) throughout the DOE Complex. This paper discusses: review initiation, team formation, methodology, site response, and observations gathered over the past three years

  1. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  2. Technical reference book for the Energy Economic Data Base (EEDB) Program

    International Nuclear Information System (INIS)

    Allen, R.E.; Benedict, R.G.; Hodson, J.S.

    1984-09-01

    The Energy Economic Data Base (EEDB) Program is sponsored by the US Department of Energy (DOE) for the purpose of developing current technical and cost information for nuclear and comparison electric power generating stations. The EEDB contains a variety of nuclear and coal-fired power plant technical data models. Each of these data models is a complete and detailed conceptual design for a single unit, commercial, steam electric, power generating station located on a standard hypothetical Middletown site. A major effort for the Sixth Update (1983) has been the updating of the system design descriptions and selected engineering drawings for the technical data models. This update took the form of revising and expanding the system design descriptions and engineering drawings contained in the Base Data Studies, to include the technical information developed and recorded in the first five EEDB updates. The results of the update effort are contained in this EEDB Program Technical Reference Book

  3. TMI-2 Technical Information and Examination Program. 1982 annual report

    International Nuclear Information System (INIS)

    1983-04-01

    The Department of Energy's Technical Information and Examination Program at Three Mile Island Unit 2 continued the research and development work begun on the island in 1980. The work concentrated in seven major areas: instrumentation and electrical components, radiation and environment, core activities, information and industry coordination, configuration and document control, waste immobilization, and reactor evaluation. The program assists in resolving specific problems at TMI-2 while developing techniques and broadening understanding of accident consequences to improve the overall safety and reliability of nuclear power. The Technical Information and Examination Program aims to communicate applicable information to the nuclear power industry to ensure that the industry can avail itself of the maximum amount of information possible

  4. 77 FR 9216 - Native American Career and Technical Education Program; Proposed Waivers and Extension of the...

    Science.gov (United States)

    2012-02-16

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Proposed Waivers...) 2007 under the Native American Career and Technical Education Program (NACTEP), the Secretary proposes... secondary school career and technical education programs. \\1\\ Section 116(a)(2) of the Carl D. Perkins...

  5. Technical procedures for land use, Deaf Smith County site, Texas: Environmental Field Program: Final draft

    International Nuclear Information System (INIS)

    1987-09-01

    This volume contains Technical Procedures pursuant to the Land Use Site Study Plan including land use data acquisition, land use/land cover map compilation, verification of land use/land cover map accuracy, and land use/land cover data analysis. 22 refs., 5 figs

  6. Mount Elbert Gas Hydrate Stratigraphic Test Well, Alaska North Slope: Overview of scientific and technical program

    Science.gov (United States)

    Hunter, R.B.; Collett, T.S.; Boswell, R.; Anderson, B.J.; Digert, S.A.; Pospisil, G.; Baker, R.; Weeks, M.

    2011-01-01

    The Mount Elbert Gas Hydrate Stratigraphic Test Well was drilled within the Alaska North Slope (ANS) Milne Point Unit (MPU) from February 3 to 19, 2007. The well was conducted as part of a Cooperative Research Agreement (CRA) project co-sponsored since 2001 by BP Exploration (Alaska), Inc. (BPXA) and the U.S. Department of Energy (DOE) in collaboration with the U.S. Geological Survey (USGS) to help determine whether ANS gas hydrate can become a technically and commercially viable gas resource. Early in the effort, regional reservoir characterization and reservoir simulation modeling studies indicated that up to 0.34 trillion cubic meters (tcm; 12 trillion cubic feet, tcf) gas may be technically recoverable from 0.92 tcm (33 tcf) gas-in-place within the Eileen gas hydrate accumulation near industry infrastructure within ANS MPU, Prudhoe Bay Unit (PBU), and Kuparuk River Unit (KRU) areas. To further constrain these estimates and to enable the selection of a test site for further data acquisition, the USGS reprocessed and interpreted MPU 3D seismic data provided by BPXA to delineate 14 prospects containing significant highly-saturated gas hydrate-bearing sand reservoirs. The "Mount Elbert" site was selected to drill a stratigraphic test well to acquire a full suite of wireline log, core, and formation pressure test data. Drilling results and data interpretation confirmed pre-drill predictions and thus increased confidence in both the prospect interpretation methods and in the wider ANS gas hydrate resource estimates. The interpreted data from the Mount Elbert well provide insight into and reduce uncertainty of key gas hydrate-bearing reservoir properties, enable further refinement and validation of the numerical simulation of the production potential of both MPU and broader ANS gas hydrate resources, and help determine viability of potential field sites for future extended term production testing. Drilling and data acquisition operations demonstrated that gas hydrate

  7. Kentucky Career and Technical Teacher Education Programs/Ongoing Issues

    Science.gov (United States)

    Workman, Ed; Stubbs, Joyce

    2012-01-01

    What is Career and Technical Education (CTE)? How does one identify and recognized strong CTE educational programs? And after one has answers to the first two questions, how does one successfully align CTE teacher education (CTTE) programs across large institutions such as colleges within universities, or in Kentucky's endeavor within universities…

  8. Technical progress by major task. Semiannual technical progress report, September 29, 1997 - March 29, 1998

    International Nuclear Information System (INIS)

    1998-01-01

    The technical progress achieved during the period 29 September 1997 through 29 March 1998 on Contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described in this report. The report is organized by program task structure: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; RTG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair

  9. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84... and Technical Education Program (NACTEP), the Secretary waives 34 CFR 75.250 and 75.261(c)(2) in order...

  10. 76 FR 13297 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Science.gov (United States)

    2011-03-11

    ... 215 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations System... Director, Defense Procurement and Acquisition Policy. DATES: Effective Date: March 11, 2011. Applicability... adding a section at 215.300 with a reference to Director, Defense Procurement and Acquisition Policy...

  11. A Multidimensional Analysis of the Joint Strike Fighter (JSF) Acquisition Program from the Perspective of Turkey

    Science.gov (United States)

    2016-12-01

    the largest and the most expensive development and acquisition program in history, with eight cost-sharing participant countries , which are the United...JSF) ACQUISITION PROGRAM FROM THE PERSPECTIVE OF TURKEY December 2016 By: Asım Furkan Demir Advisors: Nicholas Dew Mie-Sophia...VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave

  12. 76 FR 35474 - UAW-Chrysler Technical Training Center, Technology Training Joint Programs Staff, Including On...

    Science.gov (United States)

    2011-06-17

    ...-Chrysler Technical Training Center, Technology Training Joint Programs Staff, Including On-Site Leased Workers From Cranks, O/E Learning, DBSI, IDEA, and Tonic/MVP, Detroit, MI; UAW-Chrysler Technical Training... workers and former workers of UAW-Chrysler Technical Training Center, Technology Training Joint Programs...

  13. 78 FR 25292 - Announcement of Funding Awards; Office of Native American Programs Training and Technical...

    Science.gov (United States)

    2013-04-30

    ... Awards; Office of Native American Programs Training and Technical Assistance; Fiscal Year 2012 AGENCY... (NOFA) for the Office of Native American Programs Training and Technical Assistance (ONAP T&TA). This... nonprofit organizations, as well as for-profit entities to provide Training & Technical Assistance to the...

  14. Biomedical signal acquisition, processing and transmission using smartphone

    International Nuclear Information System (INIS)

    Roncagliolo, Pablo; Arredondo, Luis; Gonzalez, AgustIn

    2007-01-01

    This article describes technical aspects involved in the programming of a system of acquisition, processing and transmission of biomedical signals by using mobile devices. This task is aligned with the permanent development of new technologies for the diagnosis and sickness treatment, based on the feasibility of measuring continuously different variables as electrocardiographic signals, blood pressure, oxygen concentration, pulse or simply temperature. The contribution of this technology is settled on its portability and low cost, which allows its massive use. Specifically this work analyzes the feasibility of acquisition and the processing of signals from a standard smartphone. Work results allow to state that nowadays these equipments have enough processing capacity to execute signals acquisition systems. These systems along with external servers make it possible to imagine a near future where the possibility of making continuous measures of biomedical variables will not be restricted only to hospitals but will also begin to be more frequently used in the daily life and at home

  15. Biomedical signal acquisition, processing and transmission using smartphone

    Energy Technology Data Exchange (ETDEWEB)

    Roncagliolo, Pablo [Department of Electronics, Universidad Tecnica Federico Santa Maria, Casilla 110-V, ValparaIso (Chile); Arredondo, Luis [Department of Biomedical Engineering, Universidad de ValparaIso, Casilla 123-V, ValparaIso (Chile); Gonzalez, AgustIn [Department of Electronics, Universidad Tecnica Federico Santa MarIa, Casilla 110-V, ValparaIso (Chile)

    2007-11-15

    This article describes technical aspects involved in the programming of a system of acquisition, processing and transmission of biomedical signals by using mobile devices. This task is aligned with the permanent development of new technologies for the diagnosis and sickness treatment, based on the feasibility of measuring continuously different variables as electrocardiographic signals, blood pressure, oxygen concentration, pulse or simply temperature. The contribution of this technology is settled on its portability and low cost, which allows its massive use. Specifically this work analyzes the feasibility of acquisition and the processing of signals from a standard smartphone. Work results allow to state that nowadays these equipments have enough processing capacity to execute signals acquisition systems. These systems along with external servers make it possible to imagine a near future where the possibility of making continuous measures of biomedical variables will not be restricted only to hospitals but will also begin to be more frequently used in the daily life and at home.

  16. Biomedical signal acquisition, processing and transmission using smartphone

    Science.gov (United States)

    Roncagliolo, Pablo; Arredondo, Luis; González, Agustín

    2007-11-01

    This article describes technical aspects involved in the programming of a system of acquisition, processing and transmission of biomedical signals by using mobile devices. This task is aligned with the permanent development of new technologies for the diagnosis and sickness treatment, based on the feasibility of measuring continuously different variables as electrocardiographic signals, blood pressure, oxygen concentration, pulse or simply temperature. The contribution of this technology is settled on its portability and low cost, which allows its massive use. Specifically this work analyzes the feasibility of acquisition and the processing of signals from a standard smartphone. Work results allow to state that nowadays these equipments have enough processing capacity to execute signals acquisition systems. These systems along with external servers make it possible to imagine a near future where the possibility of making continuous measures of biomedical variables will not be restricted only to hospitals but will also begin to be more frequently used in the daily life and at home.

  17. Massachusetts Institute of Technology, Plasma Fusion Center, Technical Research Programs

    International Nuclear Information System (INIS)

    1980-08-01

    A review is given of the technical programs carried out by the Plasma Fusion Center. The major divisions of work areas are applied plasma research, confinement experiments, fusion technology and engineering, and fusion systems. Some objectives and results of each program are described

  18. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    CERN Document Server

    Cooper, J R

    2000-01-01

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual.

  19. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    International Nuclear Information System (INIS)

    COOPER, J.R.

    2000-01-01

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual

  20. Yucca Mountain Site Characterization Project Technical Data Catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear, Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  1. Yucca Mountain Site Characterization Project technical data catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  2. War-gaming application for future space systems acquisition

    Science.gov (United States)

    Nguyen, Tien M.; Guillen, Andy T.

    2016-05-01

    Recently the U.S. Department of Defense (DOD) released the Defense Innovation Initiative (DII) [1] to focus DOD on five key aspects; Aspect #1: Recruit talented and innovative people, Aspect #2: Reinvigorate war-gaming, Aspect #3: Initiate long-range research and development programs, Aspect #4: Make DOD practices more innovative, and Aspect #5: Advance technology and new operational concepts. Per DII instruction, this paper concentrates on Aspect #2 and Aspect #4 by reinvigorating the war-gaming effort with a focus on an innovative approach for developing the optimum Program and Technical Baselines (PTBs) and their corresponding optimum acquisition strategies for acquiring future space systems. The paper describes a unified approach for applying the war-gaming concept for future DOD acquisition of space systems. The proposed approach includes a Unified Game-based Acquisition Framework (UGAF) and an Advanced Game-Based Mathematical Framework (AGMF) using Bayesian war-gaming engines to optimize PTB solutions and select the corresponding optimum acquisition strategies for acquiring a space system. The framework defines the action space for all players with a complete description of the elements associated with the games, including Department of Defense Acquisition Authority (DAA), stakeholders, warfighters, and potential contractors, War-Gaming Engines (WGEs) played by DAA, WGEs played by Contractor (KTR), and the players' Payoff and Cost functions (PCFs). The AGMF presented here addresses both complete and incomplete information cases. The proposed framework provides a recipe for the DAA and USAF-Space and Missile Systems Center (SMC) to acquire future space systems optimally.

  3. A new DoD initiative: the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program

    International Nuclear Information System (INIS)

    Arevalo, S; Atwood, C; Bell, P; Blacker, T D; Dey, S; Fisher, D; Fisher, D A; Genalis, P; Gorski, J; Harris, A; Hill, K; Hurwitz, M; Kendall, R P; Meakin, R L; Morton, S; Moyer, E T; Post, D E; Strawn, R; Veldhuizen, D v; Votta, L G

    2008-01-01

    In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a $360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams

  4. Reliability and maintainability data acquisition in equipment development tests

    International Nuclear Information System (INIS)

    Haire, M.J.; Gift, E.H.

    1983-10-01

    The need for collection of reliability, maintainability, and availability data adds a new dimension to the data acquisition requirements of equipment development tests. This report describes the reliability and maintainability data that are considered necessary to ensure that sufficient and high quality data exist for a comprehensive, quantitative evaluation of equipment and system availability. These necessary data are presented as a set of data collection forms. Three data acquisition forms are discussed: an inventory and technical data form, which is filed by the design engineer when the design is finished or the equipment is received; an event report form, which is completed by the senior test operator at each shutdown; and a maintainability report, which is a collaborative effort between senior operators and lead engineers and is completed on restart. In addition, elements of a reliability, maintainability evaluation program are described. Emphasis is placed on the role of data, its storage, and use in such a program

  5. Massachusetts Institute of Technology, Plasma Fusion Center, Technical Research Programs

    Energy Technology Data Exchange (ETDEWEB)

    Davidson, Ronald C.

    1980-08-01

    A review is given of the technical programs carried out by the Plasma Fusion Center. The major divisions of work areas are applied plasma research, confinement experiments, fusion technology and engineering, and fusion systems. Some objectives and results of each program are described. (MOW)

  6. 48 CFR 1435.010 - Scientific and technical reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scientific and technical reports. 1435.010 Section 1435.010 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1435.010 Scientific and technical...

  7. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    Energy Technology Data Exchange (ETDEWEB)

    COOPER, J.R.

    2000-04-17

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual.

  8. Land Acquisition and Relocation Assistance for Airport Improvement Program (AIP) Assisted Projects

    Science.gov (United States)

    2017-07-10

    This advisory circular (AC) provides guidance to sponsors of airport projects developed under the Airport Improvement Program (AIP) to meet the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (Pl 9...

  9. 48 CFR 935.010 - Scientific and technical reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Scientific and technical reports. 935.010 Section 935.010 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.010 Scientific and technical reports. (c...

  10. 77 FR 11367 - Defense Federal Acquisition Regulation Supplement; Extension of the Test Program for Negotiation...

    Science.gov (United States)

    2012-02-24

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement to extend the program period for the DoD Test Program for Negotiation of Comprehensive Small Business Subcontracting Plans.

  11. 77 FR 30514 - Native Hawaiian Career and Technical Education Program; Final Waiver and Extension of Project Period

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native Hawaiian Career and Technical Education Program; Final Waiver and... Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.259A... Technical Education Program (NHCTEP), the Secretary hereby waives 34 CFR 75.261(c)(2) in order to extend the...

  12. GPHS-RTGs in support of the Cassini RTG Program. Semi annual technical progress report, September 26, 1994--April 2, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    The technical progress achieved during the period 26 September 1994 through 2 April 1995 on Contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described herein. Monthly technical activity for the period 27 February 1995 through 2 April 1995 is included in this progress report. The report addresses tasks, including: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; ETG Fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and CAGO acquisition (capital funds)

  13. Do Farm Programs Explain Mean and Variance of Technical Efficiency? Stochastic Frontier Analysis

    OpenAIRE

    Ranjan, Rahul; Shaik, Saleem; Mishra, Ashok K.

    2010-01-01

    Past literature has examined the importance of farm programs on the volatility and returns on general and agriculture economic growth. The objective of this study was to assess the impact of farm program payments on technical efficiency. The study used aggregate state level panel data from the U.S agricultural sector. Results indicate production increasing with increasing units of inputs. Results from this study indicate that farm program payments play an important role in technical efficienc...

  14. Study of mixed programming gamma spectrum acquisition method based on MSP430F4618

    International Nuclear Information System (INIS)

    Li Yuezhong; Tang Bin; Zhang Zhongliang; Xie Xiaolin

    2012-01-01

    In order to reduce the hand-held gamma spectrometer measurements dead time and to complete the low-voltage and low-power design, the spectrum signal acquisition circuit is constituted by the ultra-low power microcontroller MSP430F4618 and its external signal conditioning circuit, anti-coincidence circuit interface and its on-chip sample hold and A/D converter. C language programming and assembly one have been used together. The sample hold and A/D conversion and spectrum acquisition programming is accomplished by assembly language, and the system monitoring and task scheduler designing is accomplished by C language programming. The handhold gamma spectrometer power supply, which just uses two No.5 rechargeable batteries, is designed by high-efficiency DC-DC circuit. The prototype gamma spectrometer is developed by the method, and its testing shows that the implementation of spectrum acquisition time is shorten by twice to 3 times, that is, the dead measurement can be reduced; and the machine operating current does not exceed 150 mA. By using two 2400 mAh No.5 rechargeable battery, the machine can work continuously more than 10 hours, and it can meet the application requirements. (authors)

  15. Pennsylvania Department of Transportation's Local Technical Assistance Program (LTAP).

    Science.gov (United States)

    2010-11-01

    The Pennsylvania Department of Transportations (PennDOT) Local Technical Assistance Program : (LTAP) was awarded to the Pennsylvania State Association of Township Supervisors (PSATS), with the : contract start date of December 1, 2005. PSATS led t...

  16. Acquisition Path Analysis as a Collaborative Activity

    International Nuclear Information System (INIS)

    Nakao, A.; Grundule, R.; Gushchyn, K.; El Gebaly, A.; Higgy, R.; Tsvetkov, I.; Mandl, W.

    2015-01-01

    In the International Atomic Energy Agency, acquisition path analysis (APA) is indispensable to safeguards implementation. It is an integral part of both State evaluation process and the development of State level safeguards approaches, all performed through ongoing collaborative analysis of all available safeguards relevant information by State evaluation groups (SEG) with participation of other contributors, as required. To perform comprehensive State evaluation, to develop and revise State-level safeguards approaches, and to prepare annual implementation plans, the SEG in its collaborative analysis follows accepted safeguards methodology and guidance. In particular, the guide ''Performing Acquisition Path Analysis for the Development of a State-level Safeguards Approach for a State with a CSA'' is used. This guide identifies four major steps of the APA process: 1. Consolidating information about the State's past, present and planned nuclear fuel cycle-related capabilities and infrastructure; 2. Identifying and visually presenting technically plausible acquisition paths for the State; 3. Assessing acquisition path steps (State's technical capabilities and possible actions) along the identified acquisition paths; and 4. Assessing the time needed to accomplish each identified technically plausible acquisition path for the State. The paper reports on SEG members' and other contributors' experience with APA when following the above steps, including the identification of plausible acquisition pathways, estimation of time frames for all identified steps and determination of the time needed to accomplish each acquisition path. The difficulties that the SEG encountered during the process of performing the APA are also addressed. Feedback in the form of practical suggestions for improving the clarity of the acquisition path step assessment forms and a proposal for software support are also included. (author)

  17. A Review of Technical Communication Programs Outside the United States.

    Science.gov (United States)

    Alred, Gerald J.

    2001-01-01

    Examines technical communication programs outside the United States and comments on such features as their location in the university structure, links with public relations, the inclusion of internships or practicums, the balance of theory and practice, and typical course offerings. Lists a dozen major programs in seven countries. Concludes that…

  18. What Drives Students of Vocational Training Program? An Investigation on the Significance of Foreign Language Acquisition

    Directory of Open Access Journals (Sweden)

    Irina M. Solodkova

    2017-12-01

    Full Text Available The paper dwells on the distinguishing the motives that drive students of vocational training program in terms of foreign language acquisition being the main component of future employment success. In fast-changing world which is teemed with new challenges and career patterns foreign language acquisition is viewed as a foremost aspects of promotion. The aim of the current study was to identify the main motives that drive students of vocational training program for foreign language acquisition and later equip higher education authorities and teaching staff with the data to improve language education complying with the students’ requirements. To find out internal and external motives of the students enrolled to the program at The Educational Center for Professional Communicative Training of Kazan Federal University a questionnaire survey was organized. The results of the research identify that there are differences in students’ priorities of external and internal motives and there is a prevalence of the internal ones. It is accounted for by the fact that students of the program realize the significance of foreign language acquisition for their personal needs and future professional activity. But practically all of them emphasized the same personal and interpersonal factors of internal motivation. The obtained findings will be exploited as recommendations in designing the syllabus and will be of great help in choosing the appropriate forms and techniques in carrying out the course.

  19. AV-8B Remanufacture Program as Part of the Audit of the Defense Acquisition Board Review Process - FY 1994

    Science.gov (United States)

    1994-06-03

    wft*:¥A:ft:i:ft& OFFICE OF THE INSPECTOR GENERAL AV-8B REMANUFACTURE PROGRAM AS PART OF THE AUDIT OF THE DEFENSE ACQUISITION BOARD...Part of the Audit of the Defense Acquisition Board Review Process - FY 1994 B. DATE Report Downloaded From the Internet: 03/23/99 C. Report’s Point...NAVY FOR RESEARCH DEVELOPMENT AND ACQUISITION SUBJECT: Audit Report on the AV-8B Remanufacture Program as Part of the Audit of the Defense

  20. REQUIREMENT VERIFICATION AND SYSTEMS ENGINEERING TECHNICAL REVIEW (SETR) ON A COMMERCIAL DERIVATIVE AIRCRAFT (CDA) PROGRAM

    Science.gov (United States)

    2017-09-01

    VERIFICATION AND SYSTEMS ENGINEERING TECHNICAL REVIEW (SETR) ON A COMMERCIAL DERIVATIVE AIRCRAFT (CDA) PROGRAM by Theresa L. Thomas September... ENGINEERING TECHNICAL REVIEW (SETR) ON A COMMERCIAL DERIVATIVE AIRCRAFT (CDA) PROGRAM 5. FUNDING NUMBERS 6. AUTHOR(S) Theresa L. Thomas 7...CODE 13. ABSTRACT (maximum 200 words) The Naval Air Systems Command (NAVAIR) systems engineering technical review (SETR) process does not

  1. Program system RALLY - for probabilistic safety analysis of large technical systems

    International Nuclear Information System (INIS)

    Gueldner, W.; Polke, H.; Spindler, H.; Zipf, G.

    1982-03-01

    This report describes the program system RALLY to compute the reliability of large and intermeshed technical systems. In addition to a short explanation of the different programs, the possible applications of the program system RALLY are demonstrated. Finally, the most important studies carried out so far on RALLY are discussed. (orig.) [de

  2. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  3. LOFT data acquisition and visual display system (DAVDS) presentation program

    International Nuclear Information System (INIS)

    Bullock, M.G.; Miyasaki, F.S.

    1976-03-01

    The Data Acquisition and Visual Display System (DAVDS) at the Loss-of-Fluid Test Facility (LOFT) has 742 data channel recording capability of which 576 are recorded digitally. The purpose of this computer program is to graphically present the data acquired and/or processed by the LOFT DAVDS. This program takes specially created plot data buffers of up to 1024 words and generates time history plots on the system electrostatic printer-plotter. The data can be extracted from two system input devices: Magnetic disk or digital magnetic tape. Versatility has been designed in the program by providing the user three methods of scaling plots: Automatic, control record, and manual. Time required to produce a plot on the system electrostatic printer-plotter varies from 30 to 90 seconds depending on the options selected. The basic computer and program details are described

  4. Design of device driver program for PCI data acquisition adapters based on WDM of windows 2000

    International Nuclear Information System (INIS)

    Yuan Weihua; Qiao Weimin; Jing Lan; Zhu Haijun

    2003-01-01

    The paper describes the design of device driver program for PCI data acquisition adapters based on WDM of Windows 2000. Give an actual example of PCI6208. Now, several data acquisition adapters based in this method are using in national big science engineer HIRFL-CSR. (authors)

  5. 77 FR 17352 - Federal Acquisition Regulation; Women-Owned Small Business (WOSB) Program

    Science.gov (United States)

    2012-03-26

    ...-AL97 Federal Acquisition Regulation; Women-Owned Small Business (WOSB) Program Correction In rule...) * * * -- (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB... Disadvantaged Women- Owned Small Business Concerns. * * * * * Notice of Set-Aside for Economically Disadvantaged...

  6. Automation and schema acquisition in learning elementary computer programming : implications for the design of practice

    NARCIS (Netherlands)

    van Merrienboer, Jeroen J.G.; van Merrienboer, J.J.G.; Paas, Fred G.W.C.

    1990-01-01

    Two complementary processes may be distinguished in learning a complex cognitive skill such as computer programming. First, automation offers task-specific procedures that may directly control programming behavior, second, schema acquisition offers cognitive structures that provide analogies in new

  7. 77 FR 12913 - Federal Acquisition Regulation; Women-Owned Small Business (WOSB) Program

    Science.gov (United States)

    2012-03-02

    ... 2010-015; Item I; Docket 2010-0015, Sequence 1] RIN 9000-AL97 Federal Acquisition Regulation; Women... Regulation (FAR) to implement the Small Business Administration's regulations establishing the Women-Owned Small Business (WOSB) Program. This rule authorizes the restriction of competition for Federal contracts...

  8. Technical reference book for the Energy Economic Data Base (EEDB) Program

    International Nuclear Information System (INIS)

    1985-08-01

    The Energy Economic Data Base (EEDB) Program is sponsored by the US Department of Energy (DOE) for the purpose of developing current technical and cost information for nuclear and comparison electric power generating stations. The data base was first assembled in 1978 from an initial update of the technical/cost data models developed for the predecessor studies. Seven updates of the data base have been performed between 1978 and 1984, in which various technical/cost data models have been updated, added, superceded or discontinued

  9. Proceedings of the efficient separations and processing crosscutting program 1997 technical exchange meeting

    Energy Technology Data Exchange (ETDEWEB)

    Gephart, J.M. [ed.

    1997-05-01

    This document contains summaries of technology development presented at the 1997 Efficient Separations and Processing Crosscutting Program (ESP-CP) Technical Exchange Meeting (TEM), held January 28-30, 1997, in Gaithersburg, Maryland. The ESP-CP is sponsored by the U.S. Department of Energy`s Office of Environmental Management (DOE/EM), Office of Science and Technology. The ESP-CP TEM is held annually to: (1) Present current technology development activities funded by the ESP-CP. Developers of ESP-CP-funded technologies describe the problems and needs addressed by their technologies; the technical approach, accomplishments, and resolution of issues; the strategy and schedule for commercialization; and evolving potential applications. Representatives from DOE/EM`s Focus Areas also present their technology needs. (2) Promote the exchange of technical information among those developing new separations technologies, those responsible for providing new separations technologies to meet DOE/EM needs, and those who need or will potentially make use of such technologies. (3) Familiarize the ESP-CP Technical Review Team with the FY 1997 program and solicit reviewers` views on the program as a whole. This meeting is not a program review of the individual tasks, but instead focuses on the technical aspects and implementation of ESP-CP-sponsored technology or data. This document also contains a list of ESP-CP-sponsored publications, presentations, and patents. Separate abstracts have been indexed into the energy database for contributions to this proceedings.

  10. Proceedings of the efficient separations and processing crosscutting program 1997 technical exchange meeting

    International Nuclear Information System (INIS)

    Gephart, J.M.

    1997-01-01

    This document contains summaries of technology development presented at the 1997 Efficient Separations and Processing Crosscutting Program (ESP-CP) Technical Exchange Meeting (TEM), held January 28-30, 1997, in Gaithersburg, Maryland. The ESP-CP is sponsored by the U.S. Department of Energy's Office of Environmental Management (DOE/EM), Office of Science and Technology. The ESP-CP TEM is held annually to: (1) Present current technology development activities funded by the ESP-CP. Developers of ESP-CP-funded technologies describe the problems and needs addressed by their technologies; the technical approach, accomplishments, and resolution of issues; the strategy and schedule for commercialization; and evolving potential applications. Representatives from DOE/EM's Focus Areas also present their technology needs. (2) Promote the exchange of technical information among those developing new separations technologies, those responsible for providing new separations technologies to meet DOE/EM needs, and those who need or will potentially make use of such technologies. (3) Familiarize the ESP-CP Technical Review Team with the FY 1997 program and solicit reviewers' views on the program as a whole. This meeting is not a program review of the individual tasks, but instead focuses on the technical aspects and implementation of ESP-CP-sponsored technology or data. This document also contains a list of ESP-CP-sponsored publications, presentations, and patents. Separate abstracts have been indexed into the energy database for contributions to this proceedings

  11. $ANBA; a rapid, combined data acquisition and correction program for the SEMQ electron microprobe

    Science.gov (United States)

    McGee, James J.

    1983-01-01

    $ANBA is a program developed for rapid data acquisition and correction on an automated SEMQ electron microprobe. The program provides increased analytical speed and reduced disk read/write operations compared with the manufacturer's software, resulting in a doubling of analytical throughput. In addition, the program provides enhanced analytical features such as averaging, rapid and compact data storage, and on-line plotting. The program is described with design philosophy, flow charts, variable names, a complete program listing, and system requirements. A complete operating example and notes to assist in running the program are included.

  12. 76 FR 6810 - Announcement of Funding Awards for the Special Needs Assistance Programs-Technical Assistance...

    Science.gov (United States)

    2011-02-08

    ... Awards for the Special Needs Assistance Programs--Technical Assistance (SNAPS--TA) Fiscal Year 2010... funding awards for HUD'S Fiscal Year 2010 Special Needs Assistance Programs--Technical Assistance (SNAPS... Department in a competition for funding under the Notice of Funding Availability (NOFA) for the Special Needs...

  13. State technical review of the HLNW program and the peer review process

    International Nuclear Information System (INIS)

    Jacob, G.R.

    1986-01-01

    Millions of dollars are being spent on state governments' review of the Department of Energy (DOE) high level waste (HLW) repository program. A significant portion of the review efforts focus on technical issues surrounding the development and installment of HLW disposal technologies. Some view the states' technical review efforts as part of a peer review process. However, this interpretation reveals a misunderstanding of the concept of peer review and the purposes of state technical review

  14. Training and qualification program for nuclear criticality safety technical staff. Revision 1

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1997-01-01

    A training and qualification program for nuclear criticality safety technical staff personnel has been developed and implemented. All personnel who are to perform nuclear criticality safety technical work are required to participate in the program. The program includes both general nuclear criticality safety and plant specific knowledge components. Advantage can be taken of previous experience for that knowledge which is portable such as performance of computer calculations. Candidates step through a structured process which exposes them to basic background information, general plant information, and plant specific information which they need to safely and competently perform their jobs. Extensive documentation is generated to demonstrate that candidates have met the standards established for qualification

  15. Technical methods for a risk-informed, performance-based fire protection program at nuclear power plants

    International Nuclear Information System (INIS)

    Dey, M.K.

    1998-01-01

    This paper presents a technical review and examination of technical methods that are available for developing a risk-informed, performance-based fire protection program at a nuclear plant. The technical methods include ''engineering tools'' for examining the fire dynamics of fire protection problems, reliability techniques for establishing an optimal fire protection surveillance program, fire computer codes for analyzing important fire protection safety parameters, and risk-informed approaches that can range from drawing qualitative insights from risk information to quantifying the risk impact of alternative fire protection approaches. Based on this technical review and examination, it is concluded that methods for modeling fires, and reliability and fire PRA analyses are currently available to support the initial implementation of simple risk-informed, performance-based approaches in fire protection programs. (author)

  16. Technical methods for a risk-informed, performance-based fire protection program at nuclear power plants

    International Nuclear Information System (INIS)

    Dey, M.K.

    2000-01-01

    This paper presents a technical review and examination of technical methods that are available for developing a risk-informed, performance-based fire protection program at a nuclear plant. The technical methods include 'engineering tools' for examining the fire dynamics of fire protection problems, reliability techniques for establishing an optimal fire protection surveillance program, fire computer codes for analyzing important fire protection safety parameters, and risk-informed approaches that can range from drawing qualitative insights from risk information to quantifying the risk impact of alternative fire protection approaches. Based on this technical review and examination, it is concluded that methods for modeling fires, and reliability and fire probabilistic risk analyses (PRA) are currently available to support the initial implementation of simple risk-informed, performance-based approaches in fire protection programs. (orig.) [de

  17. Data acquisition techniques using PC

    CERN Document Server

    Austerlitz, Howard

    1991-01-01

    Data Acquisition Techniques Using Personal Computers contains all the information required by a technical professional (engineer, scientist, technician) to implement a PC-based acquisition system. Including both basic tutorial information as well as some advanced topics, this work is suitable as a reference book for engineers or as a supplemental text for engineering students. It gives the reader enough understanding of the topics to implement a data acquisition system based on commercial products. A reader can alternatively learn how to custom build hardware or write his or her own software.

  18. Workforce Investments: State Strategies to Preserve Higher-Cost Career Education Programs in Community and Technical Colleges

    Science.gov (United States)

    Shulock, Nancy; Lewis, Jodi; Tan, Connie

    2013-01-01

    In today's highly-skilled economy, rewarding career pathways are available to those who acquire technical skills by enrolling in certificate and associate degree programs in a community or technical college. Such programs are often more costly to offer than liberal arts and sciences programs that prepare students to transfer to four-year…

  19. CHOOZ-A expert assessment program

    International Nuclear Information System (INIS)

    Bouat, M.; Godin, R.

    1993-01-01

    CHOOZ-A Nuclear Power Plant, the first French-Belgian PWR unit (300 MWe) was definitively shut down at the end of October 1991, after 24 years in operation. Since summer 1991, the steering committee of the French (EDF) Lifetime Project has initiated a large inquiry to the different technical specialists of EDF and external organizations, trying to define a wide expert assessment program on this plant. The aim is to improve the knowledge of aging mechanisms such as those observed on the 52 PWR French nuclear power plants (900 and 1,300 MWe), and contribute to the validation of non-destructive in-service testing methods. This paper presents the retained CHOOZ-A expert assessment program and technical lines followed during its set up. First major project stages are described, then technical choices are explained, and at last the final program is presented with the specific content of each expert assessment. The definitive program is scheduled for a three year period starting at the moment of final shutdown license acquisition, with a provisional total budget of more than US $10 million

  20. Final report of the UMTRA independent technical review of TAC audit programs

    International Nuclear Information System (INIS)

    1994-10-01

    This report details the findings of an Independent Technical Review (ITR) of practices and procedures for the Uranium Mill Tailings Remedial Action (UMTRA) Project audit program. The audit program is conducted by Jacobs Engineering Group Inc., the Technical Assistance Contractor (TAC) for the UMTRA Project. The purpose of the ITR was to ensure that the TAC audit program is effective and is conducted efficiently. The ITR was conducted from May 16-20, 1994. A review team observed audit practices in the field, reviewed the TAC audit program's documentation, and discussed the program with TAC staff and management. The format of this report has been developed around EPA guidelines; they comprise most of the major section headings. Each section begins by identifying the criteria that the TAC program is measured against, then describing the approach used by the ITR team to measure each TAC audit program against the criteria. An assessment of each type of audit is then summarized for each component in the following order: Radiological audit summary; Health and safety audit summary; Environmental audit summary; Quality assurance audit summary

  1. Public service electric and gas company technical supervisory skills programs for nuclear power plant personnel

    International Nuclear Information System (INIS)

    Meredith, J.B.

    1985-01-01

    A series of training programs entitled Technical Supervisory Skills Programs for management personnel are described. The first level of this program, TSSP-1, is a seven week program designed for first-line supervisors and other selected management personnel responsible for directing the work forces in the stations. TSSP-1 includes training in PWR/BWR Technology, Supervision, Aberrant Behavior Identification, Labor Relations and Ethics, Technical Administration, Quality Assurance Program, On-the-job Training, and Specific Departmental Training. TSSP-2, TSSP-3, and TSSP-4 courses are described in this paper

  2. GPHS-RTGs in support of the Cassini mission. Semi annual technical progress report, 2 October 1995--31 March 1996

    International Nuclear Information System (INIS)

    1996-01-01

    The technical progress achieved during the period 2 October 1995 through 31 March 1996 on Contract No. DE-AC03-91SF18852, Radioisotope Generators and Ancillary Activities is described herein. This report is organized by the program task structure as follows: spacecraft integration and liaison; engineering support; safety; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment (GSE); RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance and reliability, contract changes, non-capital CAGO acquisition, and CAGO maintenance; contract acquired government-owned property (CAGO) acquisition; and program calendars

  3. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  4. A program to improve educational qualifications of reactor site technical personnel

    International Nuclear Information System (INIS)

    Christenson, J.M.; Eckart, L.E.

    1982-01-01

    The authors describe the planning and execution of a program that meets all of the Institute for Nuclear Power Operations (INPO) recommendations and Nuclear Regulatory Commission (NRC) requirements for Shift Technical Advisor (STA) education. They recall and comment these recommendations and requirements, the classification categories of the prospective candidates, indicate the courses proposed by the education program, comment the implementation of the STA program plan

  5. A Conceptual Model for Urgent Acquisition Programs

    Science.gov (United States)

    2017-04-06

    traditional acquisition to get things done quicker remaining a constant. “Recognizing this reality is the first step in building an acquisition system...an Operational Needs Statement or Joint Urgent Operational Needs Statement. Urgent acquisition policy focuses on getting capability to the field...typically funded for the equipping effort, which does not include funding for things like Service-wide production, training, or sustainment. In an AROC

  6. SHARP's systems engineering challenge: rectifying integrated product team requirements with performance issues in an evolutionary spiral development acquisition

    Science.gov (United States)

    Kuehl, C. Stephen

    2003-08-01

    Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics

  7. Partnering between Government and Industry, and Acquisition Reform Initiative

    National Research Council Canada - National Science Library

    Jones, Richard

    1997-01-01

    The diminishing use of technical Military Specifications (Mil-specs) and the increased emphasis on performance based requirements due to acquisition reform has limited technical communication between government and industry...

  8. 48 CFR 435.010 - Scientific and technical reports.

    Science.gov (United States)

    2010-10-01

    ... CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 435.010 Scientific and technical reports... all scientific and technical reports to the National Technical Information Service at the address... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Scientific and technical...

  9. Challenges in developing TSO to provide technical support in nuclear safety and security to Pakistan Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    Mallick, Shahid A.; Sherwani, Uzman Habib; Mehdi, M. Ammar

    2010-01-01

    This paper highlights the needs for the establishment of a technical support organization (TSO) in Pakistan Nuclear Regulatory Authority (PNRA), challenges faced during its development, application of training need assessment required for the competency development of its technical manpower and difficulties encountered after its evolution. Key issues addressed include recruitment of technical manpower and enhancing their competencies, acquisition of proper tools required for safety review and assessment, development of a sustainable education and training program consistent with the best international practices and taking the measures to get confidence of the regulatory body. (author)

  10. A Comprehensive Review of Selected Business Programs in Community Colleges and Area Vocational-Technical Centers. Program Review Report.

    Science.gov (United States)

    Florida State Dept. of Education, Tallahassee. Div. of Vocational, Adult, and Community Education.

    In 1988, a review was conducted of the business component of associate in arts and associate in science (AS) degree programs, and of the certificate programs in business in Florida community colleges and area vocational-technical centers. Focusing primarily on business programs in marketing, general business management, and small business…

  11. Technical reference book for the Energy Economic Data Base Program: EEDB Phase 9 (1987)

    International Nuclear Information System (INIS)

    1988-07-01

    This document provides the current technical design bases for each technical data model (of and electric generating plant) in the eighth update. It contains a set of detailed system design descriptions (supplemented with engineering drawings) for the technical data models. This distribution is the latest in a series published since 1978. The overall program purpose is to provide periodically updated, detailed base construction cost estimates for large nuclear electric operating plants. These data, which are representative of current US powerplant construction cost experience, are a useful contribution to program planning by the Office of the Assistant Secretary for Nuclear Energy

  12. Design and Assessment of an Associate Degree-Level Plant Operations Technical Education Program

    Science.gov (United States)

    Selwitz, Jason Lawrence

    Research was undertaken to develop and evaluate an associate degree-level technical education program in Plant Operations oriented towards training students in applied science, technology, engineering, and mathematics (STEM) skills and knowledge relevant to a spectrum of processing industries. This work focuses on four aspects of the curriculum and course development and evaluation research. First, the context of, and impetus for, what was formerly called vocational education, now referred to as technical or workforce education, is provided. Second, the research that was undertaken to design and evaluate an associate degree-level STEM workforce education program is described. Third, the adaptation of a student self-assessment of learning gains instrument is reviewed, and an analysis of the resulting data using an adapted logic model is provided, to evaluate the extent to which instructional approaches, in two process control/improvement-focused courses, were effective in meeting course-level intended learning outcomes. Finally, eight integrative multiscale exercises were designed from two example process systems, wastewater treatment and fast pyrolysis. The integrative exercises are intended for use as tools to accelerate the formation of an operator-technician's multiscale vision of systems, unit operations, underlying processes, and fundamental reactions relevant to multiple industries. Community and technical colleges serve a vital function in STEM education by training workers for medium- and high-skilled technical careers and providing employers the labor necessary to operate and maintain thriving business ventures. Through development of the curricular, course, and assessment-related instruments and tools, this research helps ensure associate degree-level technical education programs can engage in a continual process of program evaluation and improvement.

  13. 48 CFR 2052.211-71 - Technical progress report.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Technical progress report... Technical progress report. As prescribed at 2011.104-70(b), the contracting officer shall insert the... solicitation. Technical Progress Report (JAN 1993) The contractor shall provide a monthly Technical Progress...

  14. 48 CFR 235.010 - Scientific and technical reports.

    Science.gov (United States)

    2010-10-01

    ....010 Scientific and technical reports. (b) For DoD, the Defense Technical Information Center is responsible for collecting all scientific and technical reports. For access to these reports, follow the... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Scientific and technical...

  15. Toward an objective assessment of technical skills: a national survey of surgical program directors in Saudi Arabia.

    Science.gov (United States)

    Alkhayal, Abdullah; Aldhukair, Shahla; Alselaim, Nahar; Aldekhayel, Salah; Alhabdan, Sultan; Altaweel, Waleed; Magzoub, Mohi Elden; Zamakhshary, Mohammed

    2012-01-01

    After almost a decade of implementing competency-based programs in postgraduate training programs, the assessment of technical skills remains more subjective than objective. National data on the assessment of technical skills during surgical training are lacking. We conducted this study to document the assessment tools for technical skills currently used in different surgical specialties, their relationship with remediation, the recommended tools from the program directors' perspective, and program directors' attitudes toward the available objective tools to assess technical skills. This study was a cross-sectional survey of surgical program directors (PDs). The survey was initially developed using a focus group and was then sent to 116 PDs. The survey contains demographic information about the program, the objective assessment tools used, and the reason for not using assessment tools. The last section discusses the recommended tools to be used from the PDs' perspective and the PDs' attitude and motivation to apply these tools in each program. The associations between the responses to the assessment questions and remediation were statistically evaluated. Seventy-one (61%) participants responded. Of the respondents, 59% mentioned using only nonstandardized, subjective, direct observation for technical skills assessment. Sixty percent use only summative evaluation, whereas 15% perform only formative evaluations of their residents, and the remaining 22% conduct both summative and formative evaluations of their residents' technical skills. Operative portfolios are kept by 53% of programs. The percentage of programs with mechanisms for remediation is 29% (19 of 65). The survey showed that surgical training programs use different tools to assess surgical skills competency. Having a clear remediation mechanism was highly associated with reporting remediation, which reflects the capability to detect struggling residents. Surgical training leadership should invest more in

  16. Minicomputer evaluation for HEP data acquisition

    International Nuclear Information System (INIS)

    Hand, R.P.

    1979-12-01

    In 1978, a comprehensive market survey was carried out to select a computer for on-line data acquisition in a High Energy Physics particle experiment. Working parties consisting of Rutherford Laboratory personnel and UK based minicomputer users at CERN, were set up at RL and CERN to (a) compile a technical specification of the 'ideal' minicomputer for data acquisition, (b) prepare a technical questionnaire based on that specification for issue to computer manufacturers and (c) make recommendations based on the manufacturers' responses to the questionnaire. This paper outlines the criteria used in writing the specification and includes, as appendices, the specification and questionnaire as useful guidelines in any future exercise of this kind. (author)

  17. Technical Standards for Nursing Education Programs in the 21st Century.

    Science.gov (United States)

    Ailey, Sarah H; Marks, Beth

    The Institute of Medicine (2000, 2002) exposed serious safety problems in the health system and called for total qualitative system change. The Institute of Medicine (2011, 2015) also calls for improving the education of nurses to provide leadership for a redesigned health system. Intertwined with improving education is the need to recruit and retain diverse highly qualified students. Disability is part of diversity inclusion, but current technical standards (nonacademic requirements) for admission to many nursing programs are a barrier to the entry of persons with disabilities. Rehabilitation nurse leaders are in a unique position to improve disability diversity in nursing. The purpose of this paper is to discuss the importance of disability diversity in nursing. The history of existing technical standards used in many nursing programs is reviewed along with examples. On the basis of the concept that disability inclusion is a part of diversity inclusion, we propose a new model of technical standards for nursing education. Rehabilitation nurse leaders can lead in eliminating barriers to persons with disabilities entering nursing.

  18. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  19. Private industry opportunity and challenge: Participation in the DOE/NWPA transportation program

    International Nuclear Information System (INIS)

    Barrett, L.H.

    1986-01-01

    The program within the Office of Civilian Radioactive Waste Management (OCRWM) of the DOE has been structured so as to tap all of our resources and the author briefly describes in this paper how it does so. Then, he describes one of the greatest challenges of obtaining a certificate of compliance from the Nuclear Regulatory Commission (NRC) for innovative cask designs. The program consists of four major elements: Cask system acquisition; institutional planning and coordination; environmental and economic analyses; and operations. The purpose of this paper is to describe system acquisition and its technical aspects

  20. 75 FR 54524 - Defense Federal Acquisition Regulation Supplement; Acquisition Strategies To Ensure Competition...

    Science.gov (United States)

    2010-09-08

    ...., because the changes are to internal Government organization and operating procedures only. The rule... 48 CFR Part 207 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations... Life Cycle of Major Defense Acquisition Programs (DFARS Case 2009-D014) AGENCY: Defense Acquisition...

  1. A Video-Based CALL Program for Proficient and Less-Proficient L2 Learners' Comprehension Ability, Incidental Vocabulary Acquisition

    Science.gov (United States)

    Lin, Lu-Fang

    2010-01-01

    This study investigates first whether news video in a computer-assisted language learning (CALL) program can foster second language (L2) comprehension and incidental acquisition of adjectives, nouns, and verbs. Second, this study examines the relationship between the participants' vocabulary acquisition and their video comprehension. The…

  2. Technical monitoring and economical assessment of the micro-financed solar program in Bangladesh

    Energy Technology Data Exchange (ETDEWEB)

    Wiese, Rafael [PSE AG, Freiburg (Germany); Steidl, Michael [Micro Service Consult GmbH, Frankenthal (Germany)

    2011-07-01

    The Solar Home System (SHS) dissemination program in Bangladesh is considered to be one of the most successful programs of its kind worldwide. Between 2005 and 2010 nearly 750,000 SHS have been installed, the vast majority is at 50 Wp. Systems have been implemented in rural areas where grid electricity supply is neither available nor envisaged in the mid-term future. Supported by international grants and soft loans, monthly installation rates have increased to over 30,000 SHS. The program management responsibility lies with the Infrastructure Development Company Limited (IDCOL). Around 20 micro-finance institutions (MFI) are responsible for the technical and financial implementation. They provide micro-financing to enable their customers to purchase the SHS. The authors carried out a technical monitoring of more than 5.000 SHS since 2007. In general it was found that nearly all systems are operational and only 7% had technical problems which required immediate repairs to prevent technical failure of the SHS. The main problems in this category were damages to or bypassing of the charge controller. The authors also assessed the financial performance of the MFIs. As a result, measures for credit risk management were introduced which have strengthen the financial performance. (orig.)

  3. 48 CFR 952.242-70 - Technical direction.

    Science.gov (United States)

    2010-10-01

    ... contract. (d) All technical direction shall be issued in writing by the COR. (e) The Contractor must... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Technical direction. 952... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.242-70 Technical...

  4. 48 CFR 1552.237-71 - Technical direction.

    Science.gov (United States)

    2010-10-01

    .... (d) Technical direction will be issued in writing or confirmed in writing within five (5) days after... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Technical direction. 1552... Technical direction. As prescribed in 1537.110, insert a clause substantially the same as the following...

  5. 48 CFR 227.7102-2 - Rights in technical data.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Rights in technical data... Technical Data 227.7102-2 Rights in technical data. (a) The clause at 252.227-7015, Technical Data—Commercial Items, provides the Government specific license rights in technical data pertaining to commercial...

  6. Technical writing versus technical writing

    Science.gov (United States)

    Dillingham, J. W.

    1981-01-01

    Two terms, two job categories, 'technical writer' and 'technical author' are discussed in terms of industrial and business requirements and standards. A distinction between 'technical writing' and technical 'writing' is made. The term 'technical editor' is also considered. Problems inherent in the design of programs to prepare and train students for these jobs are discussed. A closer alliance between industry and academia is suggested as a means of preparing students with competent technical communication skills (especially writing and editing skills) and good technical skills.

  7. Data acquisition and manipulation program for the R2000 computer

    International Nuclear Information System (INIS)

    McWilliam, D.

    1980-03-01

    A data acquisition and manipulation program has been produced which enables the PFR simulator hardware to be used as a data logger or incident recorder or to acquire data from paper tape in a number of different formats. The data are stored on disc and can be displayed in graphical or alphanumeric form on video display screens. The data can be scanned, scaled and otherwise manipulated using buttons on the simulator control desk, and can be plotted or punched out on paper tape. (author)

  8. Proceedings of the Efficient Separations and Processing Cross-Cutting Program Annual Technical Exchange Meeting

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains summaries of technology development presented at the 1995 Efficient Separations and Processing Cross-Cutting Program (ESP) Annual Technical Exchange Meeting. The ESP is sponsored by the US Department of Energy's Office of Environmental Management (EM), Office of Technology Development. The meeting is held annually to promote a free exchange of ideas among technology developers, potential users (for example, EM focus areas), and other interested parties within EM. During this meeting, developers of ESP-funded technologies describe the problems and needs addressed by their technologies; the technical approach, accomplishments, and resolution of issues; the strategy and schedule for commercialization; and evolving potential applications. Presenters are asked to address the following areas: Target waste management problem, waste stream, or data need; scientific background and technical approach; technical accomplishments and resolution of technical issues; schedule and strategy for commercializing and implementing the technology or acquiring needed data; potential alternate applications of the technology or data, including outside of DOE/EM. The meeting is not a program review of the individual tasks or subtasks; but instead focuses on the technical aspects and implementation of ESP-sponsored technology or data. The meeting is also attended by members of the ESP Technical Review Team, who have the opportunity at that time to review the ESP as a whole

  9. 48 CFR 434.004 - Acquisition strategy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Acquisition strategy. 434.004 Section 434.004 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION General 434.004 Acquisition strategy. (a) The program...

  10. Development of an operator's mental model acquisition system. 1. Estimation of a physical mental model acquisition system

    International Nuclear Information System (INIS)

    Ikeda, Mitsuru; Mizoguchi, Riichirou; Yoshikawa, Shinji; Ozawa, Kenji

    1997-03-01

    This report describes a technical survey of acquisition method of an operator's understanding for functions and structures of his target nuclear plant. This method is to play a key role in the information processing framework to support on-training operators in forming their knowledge of the nuclear plants. This kind of technical framework is aiming at enhancing human operator's ability to cope with anomaly plant situations which are difficult to expect from preceding experiences or engineering surveillance. In these cases, cause identifications and responding operation selections are desired to made not only empirically but also based on thoughts about possible phenomena to take place within the nuclear plant. This report focuses on a particular element technique, defined as 'explanation-based knowledge acquisition', as the candidate technique to potentially be extended to meet the requirement written above, and discusses about applicability to the learning support system and about necessary improvements, to identify future technical developments. (author)

  11. Technical review of the Sandia Laboratories' Particle Beam Fusion Program

    International Nuclear Information System (INIS)

    1979-01-01

    This report considers the technical aspects of Sandia Laboratories' Particle Beam Fusion Program and examines the program's initial goals, the progress made to date towards reaching those goals, and the future plans or methods of reaching those original or modified goals. A summary of Sandia Laboratories' effort, which seeks to demonstrate that high voltage pulsed power generated high-current electron or light ion beams can be used to ignite a deuterium or tritium pellet, is provided. A brief review and assessment of the Sandia Pulse Power Program is given. Several critical issues and summaries of the committee members' opinions are discussed

  12. 48 CFR 34.004 - Acquisition strategy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Acquisition strategy. 34... CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION General 34.004 Acquisition strategy. The program manager, as specified in agency procedures, shall develop an acquisition strategy tailored to the particular...

  13. Glovebox glove change program at Technical Area 55, Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Olivas, J.D.; Burkett, B.O.; Weier, D.R.

    1992-01-01

    A formal glovebox glove change program is planned for the the gloveboxes in technical area 55 at the Los Alamos National laboratory. The program will increase worker safety by reducing the chance of having worn out gloves in service. The Los Alamos program is based on a similar successful program at the Rocky Flats Plant in Golden, Colorado. Glove change frequencies at Rocky Flats were determined statistically, and are based on environmental factors the glovebox gloves are subjected to

  14. Basalt Waste Isolation Project Technical Program Evaluation Process: a criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, G.C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the SWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (MWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP wll be further formalized and further applied to the review of BWIP technical activities

  15. Evaluation of the Radiography Program at Caldwell Community College and Technical Institute--Summer, 1982.

    Science.gov (United States)

    Pipes, V. David

    As part of a periodic evaluation of the occupational programs at Caldwell Community College and Technical Institute (CCC&TI), a study of the radiography program was conducted to collect information to facilitate planning, aid in program improvement, and meet accountability demands. The specific objectives of the program evaluation were to…

  16. An empirical analysis of the dynamic programming model of stockpile acquisition strategies for China's strategic petroleum reserve

    International Nuclear Information System (INIS)

    Wu, Gang; Fan, Ying; Wei, Yi-Ming; Liu, Lan-Cui

    2008-01-01

    The world's future oil price is affected by many factors. The challenge, therefore, is how to select optimal stockpile acquisition strategies to minimize the cost of maintaining a reserve. This paper provides a new method for analyzing this problem using an uncertain dynamic programming model to analyze stockpile acquisition strategies for strategic petroleum reserve. Using this model, we quantify the impact of uncertain world oil price on optimal stockpile acquisition strategies of China's strategic petroleum reserve for the period 2007-2010 and 2011-2020. Our results show that the future stockpile acquisition is related to oil prices and their probability and, if not considering the occurrence of oil supply shortage, China should at least purchase 25 million barrels when world oil price is at an optimal level. The optimal price of stockpile acquisition of every year has a stronger relationship with the probability of high price; and the optimal expected price and size of stockpile acquisition is different in each year. (author)

  17. 48 CFR 2052.211-70 - Preparation of technical reports.

    Science.gov (United States)

    2010-10-01

    ....211-70 Preparation of technical reports. As prescribed at 2011.104-70(a), the contracting officer... Reports (JAN 1993) All technical reports required by Section C and all Technical Progress Reports required... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Preparation of technical...

  18. Technical Basis - Spent Nuclear Fuels (SNF) Project Radiation and Contamination Trending Program

    International Nuclear Information System (INIS)

    ELGIN, J.C.

    2000-01-01

    This report documents the technical basis for the Spent Nuclear Fuel (SNF) Program radiation and contamination trending program. The program consists of standardized radiation and contamination surveys of the KE Basin, radiation surveys of the KW basin, radiation surveys of the Cold Vacuum Drying Facility (CVD), and radiation surveys of the Canister Storage Building (CSB) with the associated tracking. This report also discusses the remainder of radiological areas within the SNFP that do not have standardized trending programs and the basis for not having this program in those areas

  19. 77 FR 204 - Federal Acquisition Regulation; Technical Amendments

    Science.gov (United States)

    2012-01-03

    ... Parts 4, 8, 15, 19, 22, 23, 28, 42, and 52 Government procurement. Dated: December 21, 2011. Laura... paragraph (a)(2) ``http:// www.sba.gov/GC/pcr.html'' and adding ``http://www.sba.gov/content/ procurement-center-representatives'' in its place. PART 22--APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS 22...

  20. Development of an operator`s mental model acquisition system. 1. Estimation of a physical mental model acquisition system

    Energy Technology Data Exchange (ETDEWEB)

    Ikeda, Mitsuru; Mizoguchi, Riichirou [Inst. of Scientific and Industrial Research, Osaka Univ., Ibaraki (Japan); Yoshikawa, Shinji; Ozawa, Kenji

    1997-03-01

    This report describes a technical survey of acquisition method of an operator`s understanding for functions and structures of his target nuclear plant. This method is to play a key role in the information processing framework to support on-training operators in forming their knowledge of the nuclear plants. This kind of technical framework is aiming at enhancing human operator`s ability to cope with anomaly plant situations which are difficult to expect from preceding experiences or engineering surveillance. In these cases, cause identifications and responding operation selections are desired to made not only empirically but also based on thoughts about possible phenomena to take place within the nuclear plant. This report focuses on a particular element technique, defined as `explanation-based knowledge acquisition`, as the candidate technique to potentially be extended to meet the requirement written above, and discusses about applicability to the learning support system and about necessary improvements, to identify future technical developments. (author)

  1. A Longitudinal Study of Handwriting Skills in Pre-Schoolers: The Acquisition of Syllable Oriented Programming Strategies

    Science.gov (United States)

    Soler Vilageliu, Olga; Kandel, Sonia

    2012-01-01

    Previous studies have shown the relevance of the syllable as a programming unit in handwriting production, both in adults and elementary school children. This longitudinal study focuses on the acquisition of writing skills in a group of preschoolers. It examines how and when the syllable structure of the word starts regulating motor programming in…

  2. United States Program for Technical assistance to IAEA Standards. Concept Paper: Knowledge Acquisition, Skills training for enhanced IAEA safeguards inspections

    Energy Technology Data Exchange (ETDEWEB)

    Morris, F.A.; Toquam, J.L.

    1993-11-01

    This concept paper explores the potential contribution of ``Knowledge Acquisition Skills`` in enhancing the effectiveness of international safeguards inspections by the International Atomic energy Agency (IAEA, or Agency) and identifies types of training that could be provided to develop or improve such skills. For purposes of this concept paper, Knowledge Acquisition Skills are defined broadly to include all appropriate techniques that IAEA safeguards inspectors can use to acquire and analyze information relevant to the performance of successful safeguards inspections. These techniques include a range of cognitive, analytic, judgmental, interpersonal, and communications skills that have the potential to help IAEA safeguards inspectors function more effectively.

  3. GPHS-RTGs in support of the Cassini Mission. Semi annual technical report, 30 September 1996--30 March 1997

    International Nuclear Information System (INIS)

    1997-01-01

    The technical progress achieved during the period 27 January through 30 September 1996 through 30 March 1997 on Contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described. This report is organized by program task structure: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; ETG fabrication, assembly, and test; ground support equipment (GSE); RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and CAGO acquisition (capital funds)

  4. 78 FR 70481 - Federal Acquisition Regulation; Technical Amendments

    Science.gov (United States)

    2013-11-25

    ... changes to the FAR. List of Subject in 48 CFR Parts 31 and 52 Government procurement. Dated: November 18, 2013. William Clark, Acting Director, Office of Government-Wide Acquisition Policy, Office of... procedures of FAR Part 25. For line items covered by the WTO GPA, the Government will evaluate offers of U.S...

  5. Technical efficiency of women's health prevention programs in Bucaramanga, Colombia: a four-stage analysis.

    Science.gov (United States)

    Ruiz-Rodriguez, Myriam; Rodriguez-Villamizar, Laura A; Heredia-Pi, Ileana

    2016-10-13

    Primary Health Care (PHC) is an efficient strategy to improve health outcomes in populations. Nevertheless, studies of technical efficiency in health care have focused on hospitals, with very little on primary health care centers. The objective of the present study was to use the Data Envelopment Analysis to estimate the technical efficiency of three women's health promotion and disease prevention programs offered by primary care centers in Bucaramanga, Colombia. Efficiency was measured using a four-stage data envelopment analysis with a series of Tobit regressions to account for the effect of quality outcomes and context variables. Input/output information was collected from the institutions' records, chart reviews and personal interviews. Information about contextual variables was obtained from databases from the primary health program in the municipality. A jackknife analysis was used to assess the robustness of the results. The analysis was based on data from 21 public primary health care centers. The average efficiency scores, after adjusting for quality and context, were 92.4 %, 97.5 % and 86.2 % for the antenatal care (ANC), early detection of cervical cancer (EDCC) and family planning (FP) programs, respectively. On each program, 12 of the 21 (57.1 %) health centers were found to be technically efficient; having had the best-practice frontiers. Adjusting for context variables changed the scores and reference rankings of the three programs offered by the health centers. The performance of the women's health prevention programs offered by the centers was found to be heterogeneous. Adjusting for context and health care quality variables had a significant effect on the technical efficiency scores and ranking. The results can serve as a guide to strengthen management and organizational and planning processes related to local primary care services operating within a market-based model such as the one in Colombia.

  6. Psychomotor Skill Acquisition in the Technical Subjects.

    Science.gov (United States)

    PaDelford, Harry

    Psychomotor skills need to be taught in technical education courses. Some students can be taught more easily than others, depending on their physical attributes. These attributes are speed, steadiness, perception, dexterity, agility/flexibility, endurance, equilibrium/balance, strength, and coordination. Before students attempt to learn vocational…

  7. Development of a data acquisition unit intended for pulsed plasma measurements

    International Nuclear Information System (INIS)

    Moulin, B.

    1976-12-01

    A system suitable for the acquisition of the signals from measuring devices implanted in Petula and Wega is described. The technical specifications of the data acquisition system are discussed together with the results obtained [fr

  8. Productivity Measurement Of Technical Institute

    Directory of Open Access Journals (Sweden)

    Miss.Pooja Yadav

    2015-05-01

    Full Text Available Abstract The increasing concern over globalization between other things has made the achievement of lifetime skills vital for all classes of people. Achievement of such skills can be developed from technical education programs in the advance of any nation. Skill gaining provides knowledge and inculcates the approaches that are essential for arrival and progress into an occupation. When skills are developed in any occupation it will provide and improve the standard of living with the cover beside poverty thereby behind national development. This paper observes sampling distribution and moving average concept that how technical education can generate the required skills the significance of skill acquisition its roles benefits and sustainability in national development. It also mentions among others that government should look into and improve productivity that can encourage skill achievement for the youths. The solutions are divided the sampling box into few group before stacking up workstation and use table and some other wood product. Cost reduction for each solution was intended and the solution with highest cost decrease is chosen to increase the productivity of the college.

  9. Technical Progress Report for UTSI/CFFF MDH Program Completion and Related Activity

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-04-01

    Routine preventive maintenance of the DOE Coal Fired Flow Facility (CFFF) is being performed. Modernization programs, funded under subcontract from Foster Wheeler Development Corporation by the DOE HIPPS Program, have been completed on the coal processing system, the data acquisition and control system and the control room. Environmental restoration actions continued with monitoring of groundwater wells and holding pond effluent. A plan for Groundwater Remediation was prepared, coordinated with DOE and approved by the State of Tennessee. Actions are underway to dispose of spent seed/ash mixtures and excess coal remaining from the MHD POC program. The status of five (5) High Temperature Superconductor (HTS) projects is reported.

  10. 13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?

    Science.gov (United States)

    2010-01-01

    ...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What is the purpose of the 7(j) management and technical assistance program? 124.701 Section 124.701 Business Credit and Assistance SMALL...

  11. A general purpose program system for high energy physics experiment data acquisition and analysis

    International Nuclear Information System (INIS)

    Li Shuren; Xing Yuguo; Jin Bingnian

    1985-01-01

    This paper introduced the functions, structure and system generation of a general purpose program system (Fermilab MULTI) for high energy physics experiment data acquisition and analysis. Works concerning the reconstruction of MULTI system level 0.5 which can be run on the computer PDP-11/23 are also introduced briefly

  12. 1997 DOE technical standards program workshop: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The Department of Energy held its annual Technical Standards Program Workshop on July 8--10, 1997, at the Loews L`Enfant Plaza Hotel in Washington, DC. The workshop focused on aspects of implementation of the National Technology Transfer and Advancement Act of 1995 [Public Law (PL) 104-113] and the related revision (still pending) to OMB Circular A119 (OMB A119), Federal Participation in the Development and Use of Voluntary Standards. It also addressed DOE`s efforts in transitioning to a standards-based operating culture, and, through this transition, to change from a developer of internal technical standards to a customer of external technical standards. The workshop was designed to provide a forum to better understand how the new law is affecting Department activities. Panel topics such as ``Public Law 104-113 and Its Influence on Federal Agency Standards Activities`` and ``Update on Global Standards Issues`` provided insight on both the internal and external effects of the new law. Keynote speaker Richard Meier of Meadowbrook International (and formerly the Deputy Assistant US Trade Representative) addressed the subject of international trade balance statistics. He pointed out that increases in US export figures do not necessarily indicate increases in employment. Rather, increased employment results from product growth. Mr Meier also discussed issues such as the US migration to the sue of the metric system, the impact of budget limitations on Government participation in voluntary standards organizations, international standards ISO 9000 and ISO 14000, and DOE`s role in the worldwide transition from weapons production to cleanup.

  13. Toward an objective assessment of technical skills: a national survey of surgical program directors in Saudi Arabia

    Directory of Open Access Journals (Sweden)

    Alkhayal A

    2012-10-01

    Full Text Available Abdullah Alkhayal,1 Shahla Aldhukair,2 Nahar Alselaim,1 Salah Aldekhayel,1 Sultan Alhabdan,1 Waleed Altaweel,3 Mohi Elden Magzoub,4 Mohammed Zamakhshary1,21Department of Surgery, King Saud bin Abdulaziz University for Health Sciences, Riyadh, Saudi Arabia; 2Public Health Section, King Abdullah International Medical Research Center, Riyadh, Saudi Arabia; 3Urology Department, King Faisal Specialist Hospital and Research Center, Riyadh, Saudi Arabia; 4Department of Medical Education, King Saud bin Abdulaziz University for Health Sciences, Riyadh, Saudi ArabiaBackground: After almost a decade of implementing competency-based programs in postgraduate training programs, the assessment of technical skills remains more subjective than objective. National data on the assessment of technical skills during surgical training are lacking. We conducted this study to document the assessment tools for technical skills currently used in different surgical specialties, their relationship with remediation, the recommended tools from the program directors’ perspective, and program directors’ attitudes toward the available objective tools to assess technical skills.Methods: This study was a cross-sectional survey of surgical program directors (PDs. The survey was initially developed using a focus group and was then sent to 116 PDs. The survey contains demographic information about the program, the objective assessment tools used, and the reason for not using assessment tools. The last section discusses the recommended tools to be used from the PDs’ perspective and the PDs’ attitude and motivation to apply these tools in each program. The associations between the responses to the assessment questions and remediation were statistically evaluated.Results: Seventy-one (61% participants responded. Of the respondents, 59% mentioned using only nonstandardized, subjective, direct observation for technical skills assessment. Sixty percent use only summative

  14. LabVIEW-based control and data acquisition system for cathodoluminescence experiments.

    Science.gov (United States)

    Bok, J; Schauer, P

    2011-11-01

    Computer automation of cathodoluminescence (CL) experiments using equipment developed in our laboratory is described. The equipment provides various experiments for CL efficiency, CL spectra, and CL time response studies. The automation was realized utilizing the graphical programming environment LabVIEW. The developed application software with procedures for equipment control and data acquisition during various CL experiments is presented. As the measured CL data are distorted by technical limitations of the equipment, such as equipment spectral sensitivity and time response, data correction algorithms were incorporated into the procedures. Some examples of measured data corrections are presented. © 2011 American Institute of Physics

  15. An intensive combined training program modulates physical, physiological, biomotoric, and technical parameters in women basketball players.

    Science.gov (United States)

    Kilinç, Fatih

    2008-11-01

    The purpose of this study was the investigation of the effects of an intensive combined training program based on the pretest scores of a university women's basketball team on their physical, physiological, biomotoric, and technical features. Twenty-four university volunteers were equally divided into two groups: an experiment group (intensive combined training group) and a control (technical training) group. The 10-week intensive combined training program was performed on the experiment group according to their pretest outcomes. Before and at the end of each period of training, which was scheduled four times a week, the physical, physiological, biomotoric, and technical performance of each subject were determined. With respect to the pre- and posttest measurements, the basketball group showed significant differences (p training program performed on university women basketball players had a significant effect on improving their physical, physiological, biomotoric, and technical features. It proved to be highly recommendable for female basketball players who are preparing for short-term tournaments; the basketball group in this study won a championship.

  16. The Basalt Waste Isolation Project technical program evaluation process: A criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the BWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (NWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP will be further formalized and further applied to the review of BWIP technical activities

  17. The image acquisition system design of floor grinder

    Science.gov (United States)

    Wang, Yang-jiang; Liu, Wei; Liu, Hui-qin

    2018-01-01

    Based on linear CCD, high resolution image real-time acquisition system serves as designing a set of image acquisition system for floor grinder through the calculation of optical imaging system. The entire image acquisition system can collect images of ground before and after the work of the floor grinder, and the data is transmitted through the Bluetooth system to the computer and compared to realize real-time monitoring of its working condition. The system provides technical support for the design of unmanned ground grinders.

  18. New KENS data acquisition system

    International Nuclear Information System (INIS)

    Arai, M.; Furusaka, M.; Satoh, S.

    1989-01-01

    In this report, the authors discuss a data acquisition system, KENSnet, which is newly introduced to the KENS facility. The criteria for the data acquisition system was about 1 MIPS for CPU speed and 150 Mbytes for storage capacity for a computer per spectrometer. VAX computers were chosen with their propreitary operating system, VMS. The Vax computers are connected by a DECnet network mediated by Ethernet. Front-end computers, Apple Macintosh Plus and Macintosh II, were chosen for their user-friendly manipulation and intelligence. New CAMAC-based data acquisition electronics were developed. The data acquisition control program (ICP) and the general data analysis program (Genie) were both developed at ISIS and have been installed. 2 refs., 3 figs., 1 tab

  19. Variability in "1"8F-FDG PET/CT methodology of acquisition, reconstruction and analysis for oncologic imaging: state survey

    International Nuclear Information System (INIS)

    Fischer, Andreia C.F. da S.; Druzian, Aline C.; Bacelar, Alexandre; Pianta, Diego B.; Silva, Ana M. Marques da

    2016-01-01

    The SUV in "1"8F-FDG PET/CT oncological imaging is useful for cancer diagnosis, staging and treatment assessment. There are, however, several factors that can give rise to bias in SUV measurements. When using SUV as a diagnostic tool, one needs to minimize the variability in this measurement by standardization of patient preparation, acquisition and reconstruction parameters. The aim of this study is to evaluate the methodological variability in PET/CT acquisition in Rio Grande do Sul State. For that, in each department, a questionnaire was applied to survey technical information from PET/CT systems and about the acquisitions and analysis methods utilized. All departments implement quality assurance programs consistent with (inter)national recommendations. However, the acquisition and reconstruction methods of acquired PET data differ. The implementation of a harmonized strategy for quantifying the SUV is suggested, in order to obtain greater reproducibility and repeatability. (author)

  20. Sources of transportation expertise by selected technical areas

    International Nuclear Information System (INIS)

    1987-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) has assigned components of its Waste Transportation Program to three of the DOE Operations offices. The DOE Oak Ridge Operations Office (ORO) is responsible for the transportation operations design, development, acquisition, testing, implementation, and program management, including the equipment, facilities, and services of the transportation system. Within ORO, the OCRWM transportation component is assigned to the Transportation Operations Project Office (TOPO). The specific activities involved in the ORO/TOPO include procurement, operational testing, inspection, logistics, interfaces, maintenance, management and improvements, and system operation. Oak Ridge Associated Universities (ORAU) has developed (and will maintain and enhance) a data base of sources of transportation expertise in selected technical areas for ORO. The data base includes individuals and organizations who have indicated that they have capabilities and interest in assisting ORO in the design, development, implementation, and management of the OCRWM transportation system. This assistance might be in the form of consulting or subcontract work and/or participation in peer review panels, technical evaluation committees, workshops, advisory groups, etc. This initial project was completed in the four month period of January 30, 1987 through May 31, 1987

  1. The Cuban nuclear program and its Scientific and Technical Infrastructure

    International Nuclear Information System (INIS)

    Gandarias Cruz, D.; Codorniu Pujals, D.

    1995-01-01

    The present paper shows the aspects including the Cuban Nuclear Program and underlines its close connection with the strategy of economic, social and scientific technical development in the country, the organizing structure of the Cuban nuclear activity is explained. The application of nuclear techniques and research development activity in the nuclear field are also expressed in detailed in this paper

  2. Technical program plan for the transitioning, decommissioning, and final disposition focus area

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    Hundreds of aging nuclear materials processing facilities within the Department of Energy`s (DOE) Weapons Complex are now being shut down and deactivated. These facilities, situated throughout the United States, will require a monumental effort to clean up safely and with minimal environmental insult. Current cleanup technologies tend to be labor intensive and expensive, they produce an unacceptably large volume of waste, and they expose workers to radioactive and other hazardous substances. This document describes an emerging program designed to develop and demonstrate new technical approaches to the decontamination and decommissioning (D&D) program for DOE`s nuclear materials processing facilities. Sponsored by the DOE Office of Technology Development within the Office of Environmental Restoration and Waste Management (EM), the program seeks to integrate the strengths of DOE`s technical, managerial, and systems engineering capabilities with those of industry, universities, and other government agencies. Once developed, these technologies will help to provide US industry with a competitive edge in the worldwide market that exists for improved environmental restoration and D&D services.

  3. Technical program plan for the transitioning, decommissioning, and final disposition focus area

    International Nuclear Information System (INIS)

    1994-01-01

    Hundreds of aging nuclear materials processing facilities within the Department of Energy's (DOE) Weapons Complex are now being shut down and deactivated. These facilities, situated throughout the United States, will require a monumental effort to clean up safely and with minimal environmental insult. Current cleanup technologies tend to be labor intensive and expensive, they produce an unacceptably large volume of waste, and they expose workers to radioactive and other hazardous substances. This document describes an emerging program designed to develop and demonstrate new technical approaches to the decontamination and decommissioning (D ampersand D) program for DOE's nuclear materials processing facilities. Sponsored by the DOE Office of Technology Development within the Office of Environmental Restoration and Waste Management (EM), the program seeks to integrate the strengths of DOE's technical, managerial, and systems engineering capabilities with those of industry, universities, and other government agencies. Once developed, these technologies will help to provide US industry with a competitive edge in the worldwide market that exists for improved environmental restoration and D ampersand D services

  4. Development of Data Acquisition System for nuclear thermal hydraulic out-of-pile facility using the graphical programming methods

    Energy Technology Data Exchange (ETDEWEB)

    Bouaichaoui, Youcef; Berrahal, Abderezak; Halbaoui, Khaled [Birine Nuclear Research Center/CRNB/COMENA/ALGERIA, BO 180, Ain Oussera, 17200, Djelfa (Algeria)

    2015-07-01

    This paper describes the design of data acquisition system (DAQ) that is connected to a PC and development of a feedback control system that maintains the coolant temperature of the process at a desired set point using a digital controller system based on the graphical programming language. The paper will provide details about the data acquisition unit, shows the implementation of the controller, and present test results. (authors)

  5. Research in the Doctoral Program in Second Language Acquisition at the University of Wisconsin-Madison

    Science.gov (United States)

    De Costa, Peter I.; Bernales, Carolina; Merrill, Margaret

    2011-01-01

    Faculty and graduate students in the Doctoral Program in Second Language Acquisition (SLA) at the University of Wisconsin-Madison engage in a broad spectrum of research. From Professor Sally Magnan's research on study abroad and Professor Monika Chavez's work in foreign language policy through Professor Richard Young's examination of…

  6. 77 FR 13013 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Science.gov (United States)

    2012-03-05

    ... Organization Government Procurement Agreement and the Free Trade Agreements, as determined by the United States... 252 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations System...

  7. Transportable educational programs for scientific and technical professionals: More effective utilization of automated scientific and technical data base systems

    Science.gov (United States)

    Dominick, Wayne D.

    1987-01-01

    This grant final report executive summary documents a major, long-term program addressing innovative educational issues associated with the development, administration, evaluation, and widespread distribution of transportable educational programs for scientists and engineers to increase their knowledge of, and facilitate their utilization of automated scientific and technical information storage and retrieval systems. This educational program is of very broad scope, being targeted at Colleges of Engineering and Colleges of Physical sciences at a large number of colleges and universities throughout the United States. The educational program is designed to incorporate extensive hands-on, interactive usage of the NASA RECON system and is supported by a number of microcomputer-based software systems to facilitate the delivery and usage of the educational course materials developed as part of the program.

  8. 48 CFR 252.235-7011 - Final scientific or technical report.

    Science.gov (United States)

    2010-10-01

    ... technical report. 252.235-7011 Section 252.235-7011 Federal Acquisition Regulations System DEFENSE... CLAUSES Text of Provisions And Clauses 252.235-7011 Final scientific or technical report. As prescribed in 235.072(d), use the following clause: Final Scientific or Technical Report (NOV 2004) The Contractor...

  9. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  10. Knowledge Acquisition and Job Training for Advanced Technical Skills Using Immersive Virtual Environment

    Science.gov (United States)

    Watanuki, Keiichi; Kojima, Kazuyuki

    The environment in which Japanese industry has achieved great respect is changing tremendously due to the globalization of world economies, while Asian countries are undergoing economic and technical development as well as benefiting from the advances in information technology. For example, in the design of custom-made casting products, a designer who lacks knowledge of casting may not be able to produce a good design. In order to obtain a good design and manufacturing result, it is necessary to equip the designer and manufacturer with a support system related to casting design, or a so-called knowledge transfer and creation system. This paper proposes a new virtual reality based knowledge acquisition and job training system for casting design, which is composed of the explicit and tacit knowledge transfer systems using synchronized multimedia and the knowledge internalization system using portable virtual environment. In our proposed system, the education content is displayed in the immersive virtual environment, whereby a trainee may experience work in the virtual site operation. Provided that the trainee has gained explicit and tacit knowledge of casting through the multimedia-based knowledge transfer system, the immersive virtual environment catalyzes the internalization of knowledge and also enables the trainee to gain tacit knowledge before undergoing on-the-job training at a real-time operation site.

  11. The Joint Program Dilemma: Analyzing the Pervasive Role that Social Dilemmas Play in Undermining Acquisition Success

    Science.gov (United States)

    2013-04-01

    acquisition programs may substantially exceed budget, overrun schedule, deliver inadequate quality, and ultimately even fail ( Frangos , 1998; Madachy, 2008...Society. Fehr, E., & Gachter, S. (2002, January). Altruistic punishment in humans. Nature, 415, 137–140. Frangos , S. A. (1998). Motivated humans for

  12. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  13. IAEA Safeguards and technical support programs: POTAS in the 1990s

    International Nuclear Information System (INIS)

    Kessler, C.J.

    1991-01-01

    The US Program of Technical Assistance to IAEA Safeguards (POTAS) has since 1978 provided technology and technical assistance to the IAEA to support its nuclear safeguards activities. The present level of support, $6.9 million per year, equals 10% of the Department of Safeguards annual budget. During the next decade, the International Atomic Energy Agency (IAEA) will face new technical challenges in carrying out its verification activities. To help the IAEA acquire the technology and other technical support that it will require in the 1990s, POTAS expects to continue its assistance, both in the areas established in the past and in additional areas dictated by newly identified IAEA safeguards requirements. This paper will look at the political and policy context within which the Department of Safeguards, and hence POTAS, operates, and how that context is expected to evolve over the next decade. The roles and functions of POTAS will be identified and discussed in terms of their historical evolution. Lastly, the paper will consider how POTAS is expected to change during the 1990s, both to maintain effectiveness in existing roles and functions, and to meet the challenge of the changing policy context. 5 refs

  14. 48 CFR 212.7003 - Technical data and computer software.

    Science.gov (United States)

    2010-10-01

    ... computer software. 212.7003 Section 212.7003 Federal Acquisition Regulations System DEFENSE ACQUISITION... data and computer software. For purposes of establishing delivery requirements and license rights for technical data under 227.7102 and for computer software under 227.7202, there shall be a rebuttable...

  15. IT-based Value Creation in Serial Acquisitions

    DEFF Research Database (Denmark)

    Henningsson, Stefan; Yetton, Philip

    2013-01-01

    serial acquirers realize IT-based value, we integrate and model the findings on individual acquisitions from the extant literature, and extend that model to explain the effects of sequential acquisitions in a growth-by-acquisition strategy. This extended model, drawing on the Resource-Based Theory......The extant research on post-acquisition IT integration analyzes how acquirers realize IT-based value in individual acquisitions. However, serial acquirers make 60% of acquisitions. These acquisitions are not isolated events, but are components in growth-by-acquisition programs. To explain how...

  16. CONTROL: the run control program used on the WA62 VAX data acquisition system at CERN

    International Nuclear Information System (INIS)

    Hand, R.P.

    1980-11-01

    The criteria are described which have been used in the design of CONTROL, a program in the WA62 VAX Native mode data acquisition system which serves the triple purpose of driving a status display, an operator's console and a message reporter. (U.K.)

  17. Planning and implementation of Istanbul Technical University TRIGA research reactor program

    International Nuclear Information System (INIS)

    Aybers, N.; Yavuz, H.; Bayulken, A.

    1982-01-01

    The Istanbul Technical University TRIGA Research Reactor at the Institute for Nuclear Energy, which went critical on March 11, 1979 is basically a pulsing type TRIGA Mark - II reactor. Completion of the ITU-TRR contributed to broaden the role of the Institute for Nuclear Energy of the Technical University in Istanbul in the nuclear field by providing for the first time adequate on-campus experimental facilities for nuclear engineering studies to ITU students. The research program which is currently under planning at ITU-NEE encompasses: a) Neutron activation analysis studies by techniques and applications to chemistry, mining, materials research, archaeological and biomedical studies; b) applications of Radioisotopes; c) Radiography with reactor neutron beams; d) Radiation Pulsing

  18. Development of emergency response training program for on-site commanders (2). Extraction of non-technical skills

    International Nuclear Information System (INIS)

    Matsui, Yuko; Hikono, Masaru; Iwasaki, Mari; Morita, Miduho

    2017-01-01

    This study aimed at characterizing a non-technical skill exercise for on-site managers in charge of initial response at an emergency response center by extracting and clarifying the behavior examples of non-technical skills shown in the exercise scenario. From video observations, the non-technical skill examples were identified from seven of the eight non-technical skill categories which had been defined when the training program was developed. At the same time, the limitation when extracting the cases by observations was identified. The extracted non-technical skill cases are expected to be used for characterizing exercise scenarios, as well as provide knowledge to raise the awareness of exercise participants. (author)

  19. Computer programs for the acquisition and analysis of eddy-current array probe data

    International Nuclear Information System (INIS)

    Pate, J.R.; Dodd, C.V.

    1996-07-01

    Objective of the Improved Eddy-Curent ISI (in-service inspection) for Steam Generators Tubing program is to upgrade and validate eddy-current inspections, including probes, instrumentation, and data processing techniques for ISI of new, used, and repaired steam generator tubes; to improve defect detection, classification and characterization as affected by diameter and thickness variations, denting, probe wobble, tube sheet, tube supports, copper and sludge deposits, even when defect types and other variables occur in combination; to transfer this advanced technology to NRC's mobile NDE laboratory and staff. This report documents computer programs that were developed for acquisition of eddy-current data from specially designed 16-coil array probes. Complete code as well as instructions for use are provided

  20. A 2015 Status Study of Career and Technical Education Programs in the United States

    Science.gov (United States)

    Fletcher, Edward C., Jr.; Gordon, Howard R. D.; Asunda, Paul; Zirkle, Chris

    2015-01-01

    With the decline of Career and Technical Education (CTE) programs across the nation, there has been an interest in examining the status of these programs, particularly given the increased demand for CTE K-12 teachers. It has been 15 years since Bruening et al. (2001) conducted a similar national investigation. In this descriptive study, we…

  1. Technical assistance from state health departments for communities engaged in policy, systems, and environmental change: the ACHIEVE Program.

    Science.gov (United States)

    Hefelfinger, Jenny; Patty, Alice; Ussery, Ann; Young, Walter

    2013-10-24

    This study assessed the value of technical assistance provided by state health department expert advisors and by the staff of the National Association of Chronic Disease Directors (NACDD) to community groups that participated in the Action Communities for Health, Innovation, and Environmental Change (ACHIEVE) Program, a CDC-funded health promotion program. We analyzed quantitative and qualitative data reported by community project coordinators to assess the nature and value of technical assistance provided by expert advisors and NACDD staff and the usefulness of ACHIEVE resources in the development and implementation of community action plans. A grounded theory approach was used to analyze and categorize phrases in text data provided by community coordinators. Open coding placed conceptual labels on text phrases. Frequency distributions of the quantitative data are described and discussed. The most valuable technical assistance and program support resources were those determined to be in the interpersonal domain (ie, interactions with state expert advisors, NACDD staff, and peer-to-peer support). The most valuable technical assistance events were action institutes, coaches' meetings, webinars, and technical assistance conference calls. This analysis suggests that ACHIEVE communities valued the management and training assistance provided by expert advisors and NACDD staff. State health department expert advisors provided technical guidance and support, including such skills or knowledge-based services as best-practice strategies, review and discussion of community assessment data, sustainability planning, and identification of possible funding opportunities. NACDD staff led development and implementation of technical assistance events.

  2. Graphical user interface for image acquisition and processing

    Science.gov (United States)

    Goldberg, Kenneth A.

    2002-01-01

    An event-driven GUI-based image acquisition interface for the IDL programming environment designed for CCD camera control and image acquisition directly into the IDL environment where image manipulation and data analysis can be performed, and a toolbox of real-time analysis applications. Running the image acquisition hardware directly from IDL removes the necessity of first saving images in one program and then importing the data into IDL for analysis in a second step. Bringing the data directly into IDL creates an opportunity for the implementation of IDL image processing and display functions in real-time. program allows control over the available charge coupled device (CCD) detector parameters, data acquisition, file saving and loading, and image manipulation and processing, all from within IDL. The program is built using IDL's widget libraries to control the on-screen display and user interface.

  3. Technical and Economic Aspects of Designing an Efficient Room Air-Conditioner Program in India

    Energy Technology Data Exchange (ETDEWEB)

    Abhyankar, Nikit [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Div.; Shah, Nihar [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Div.; Phadke, Amol [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Div.; Park, Won Young [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States). Energy Analysis and Environmental Impacts Div.

    2017-09-05

    Several studies have projected a massive increase in the demand for air conditioners (ACs) over the next two decades in India. By 2030, room ACs could add 140 GW to the peak load, equivalent to over 30% of the total projected peak load. Therefore, there is significant interest among policymakers, regulators, and utilities in managing room AC demand by enhancing energy efficiency. Building on the historical success of the Indian Bureau of Energy Efficiency’s star-labeling program, Energy Efficiency Services Limited recently announced a program to accelerate the sale of efficient room ACs using bulk procurement, similar to their successful UJALA light-emitting diode (LED) bulk procurement program. This report discusses some of the key considerations in designing a bulk procurement or financial incentive program for enhancing room AC efficiency in India. We draw upon our previous research to demonstrate the overall technical potential and price impact of room AC efficiency improvement and its technical feasibility in India. We also discuss the importance of using low global warming potential (GWP) refrigerants and smart AC equipment that is demand response (DR) ready.

  4. Acquisition: Implementation of the DoD Management Control Program for Navy Acquisition Category II and III Programs

    National Research Council Canada - National Science Library

    2004-01-01

    Who Should Read This Report and Why? Civil service and uniformed officers who are involved in the Navy acquisition decision making process should read this report because it provides an assessment of how the Navy can improve...

  5. Transuranic waste program at EG and G Idaho, Inc. Annual technical report

    International Nuclear Information System (INIS)

    Smith, T.H.; Tolman, C.R.

    1980-12-01

    This document summarizes the objectives and technical achievements of the transuranic (TRU) waste research and development program conducted at EG and G Idaho, Inc., during fiscal year 1980. The TRU waste activities covered in this report include: INEL TRU Waste EIS (Environmental Impact Statement), including preparation of the EIS, Support Studies, and the Public Participation Program; INEL TRU Waste Projects, including System Analysis, Stored Waste projects, and Buried Waste projects; and Waste Management Materials Studies, including Process Control and Durability studies

  6. 78 FR 43091 - Technical Operations Safety Action Program (T-SAP) and Air Traffic Safety Action Program (ATSAP)

    Science.gov (United States)

    2013-07-19

    ... Administration 14 CFR Part 193 [Docket No.: FAA-2013-0375] Technical Operations Safety Action Program (T-SAP) and... Disclosure. SUMMARY: The FAA is proposing that safety information provided to it under the T-SAP, established... to the FAA under the T-SAP and ATSAP, so the FAA can learn about and address aviation safety hazards...

  7. Compulsory acquisition of shares buyer, other shareholders, abuse of right of compulsory acquisition of shares

    Directory of Open Access Journals (Sweden)

    Arsić Zoran V.

    2015-01-01

    Full Text Available Company Act of Republic of Serbia includes mechanism for the compulsory acquisition of the shareholdings of minority shareholders. Technically this procedure is effected on the basis of the shareholders assembly resolution. Buyer is shareholder who has at least 90% of share capital and at least 90% of votes. Shares owned by entity under his dominant influence will be treated as shares of that shareholder provided that dominant influence exists at least one year. Company's own shares, and shares subject o a pledge do not represent shares of other shareholders. There are several actions which may be treated as abuse of right of compulsory acquisition of shares.

  8. Acquisition: Acquisition of Targets at the Missile Defense Agency

    National Research Council Canada - National Science Library

    Ugone, Mary L; Meling, John E; James, Harold C; Haynes, Christine L; Heller, Brad M; Pomietto, Kenneth M; Bobbio, Jaime; Chang, Bill; Pugh, Jacqueline

    2005-01-01

    Who Should Read This Report and Why? Missile Defense Agency program managers who are responsible for the acquisition and management of targets used to test the Ballistic Missile Defense System should be interested in this report...

  9. Technical procedures for utilities and solid waste: Environmental Field Program, Deaf Smith County site, Texas: Final draft

    International Nuclear Information System (INIS)

    1987-08-01

    The evaluation of environmental issues and concerns and the addressing of statutory requirements are fundamental parts in the characterization of the site in Deaf Smith County, Texas for the US Department of Energy's Salt Repository Project (SRP). To ensure that the environmental field program comprehensively addresses the issues and requirements of the project, a site study plan (SSP) has been prepared for Utilities and Solid Waste considerations. This technical procedure (TP) has been developed to implement the field program described in the Utilities and Solid Waste Site Study Plan. The purpose and scope of the Utilities and Solid Waste Technical Procedure is to develop and implement a data collection procedure to fulfill the data base needs of the Utilities and Solid Waste SSP. The procedure describes a method of obtaining, assessing and verifying the capabilities of the regional service utilities and disposal contractors. This data base can be used to identify a preferred service source for the engineering contractor. The technical procedure was produced under the guidelines established in Technical Administrative Procedure No. 1.0, Preparation, Review and Approval of Technical Procedures

  10. Data Acquisition System

    International Nuclear Information System (INIS)

    Cirstea, C.D.; Buda, S.I.; Constantin, F.

    2005-01-01

    This paper deals with a multi parametric acquisition system developed for a four input Analog to Digital Converter working in CAMAC Standard. The acquisition software is built in MS Visual C++ on a standard PC with a USB interface. It has a visual interface which permits Start/Stop of the acquisition, setting the type of acquisition (True/Live time), the time and various menus for primary data acquisition. The spectrum is dynamically visualized with a moving cursor indicating the content and position. The microcontroller PIC16C765 is used for data transfer from ADC to PC; The microcontroller and the software create an embedded system which emulates the CAMAC protocol programming the 4 input ADC for operating modes ('zero suppression', 'addressed' and 'sequential') and handling the data transfers from ADC to its internal memory. From its memory the data is transferred into the PC by the USB interface. The work is in progress. (authors)

  11. Data acquisition system

    International Nuclear Information System (INIS)

    Cirstea, D.C.; Buda, S.I.; Constantin, F.

    2005-01-01

    The topic of this paper deals with a multi parametric acquisition system developed around a four input Analog to Digital Converter working in CAMAC Standard. The acquisition software is built in MS Visual C++ on a standard PC with a USB interface. It has a visual interface which permits Start/Stop of the acquisition, setting the type of acquisition (True/Live time), the time and various menus for primary data acquisition. The spectrum is dynamically visualized with a moving cursor indicating the content and position. The microcontroller PIC16C765 is used for data transfer from ADC to PC; The microcontroller and the software create an embedded system which emulates the CAMAC protocol programming, the 4 input ADC for operating modes ('zero suppression', 'addressed' and 'sequential') and handling the data transfers from ADC to its internal memory. From its memory the data is transferred into the PC by the USB interface. The work is in progress. (authors)

  12. Radioactive waste isolation in salt: rationale and methodology for Argonne-conducted reviews of site characterization programs

    International Nuclear Information System (INIS)

    Harrison, W.; Ditmars, J.D.; Tisue, M.W.; Hambley, D.F.; Fenster, D.F.; Rote, D.M.

    1985-07-01

    Both regulatory and technical concerns must be addressed in Argonne-conducted peer reviews of site characterization programs for individual sites for a high-level radioactive waste repository in salt. This report describes the regulatory framework within which reviews must be conducted and presents background information on the structure and purpose of site characterization programs as found in US Nuclear Regulatory Commission (NRC) Regulatory Guide 4.17 and Title 10, Part 60, of the Code of Federal Regulations. It also presents a methodology to assist reviewers in addressing technical concerns relating to their respective areas of expertise. The methodology concentrates on elements of prime importance to the US Department of Energy's advocacy of a given salt repository system during the NRC licensing process. Instructions are given for reviewing 12 site characterization program elements, starting with performance objectives, performance issues, and levels of performance of repository subsystem components; progressing through performance assessment; and ending with plans for data acquisition and evaluation. The success of a site characterization program in resolving repository performance issues will be determined by judging the likelihood that the proposed data acquisition activities will reduce uncertainties in the performance predictions. 8 refs., 3 figs., 5 tabs

  13. A Qualitative Inquiry of Career Exploration in Highly Implemented Career and Technical Education Programs of Study

    Science.gov (United States)

    Stipanovic, Natalie; Stringfield, Sam

    2013-01-01

    This qualitative study explores career counseling and guidance services as provided to students engaged in career and technical education programs at three sites in the United States. The sites, consisting of high schools and community colleges, were part of the National Research Center for Career and Technical Education's 5-year studies of…

  14. Soft Skills in Health Careers Programs: A Case Study of A Regional Vocational Technical High School

    Science.gov (United States)

    Park, Chong Myung

    2017-01-01

    The purpose of this study is to develop an understanding of the ways in which educational experiences might differ between a regional vocational technical high school (RVTH) and short-term career-training programs. A particular regional vocational technical high school was selected for its outstanding academic records and placement rates, and a…

  15. Technical-Oriented Enterprise Resource Planning (ERP) Body of Knowledge for Information Systems Programs: Content and Implementation

    Science.gov (United States)

    Boyle, Todd A.

    2007-01-01

    In this article, the author proposes a body of knowledge that the educators can use to incorporate the technical aspects of enterprise resource planning (ERP) into an information systems (IS) program, encapsulated as the ERP technical knowledge framework. To illustrate the application of this framework, the author discusses a course sequence that…

  16. Program of technical assistance to the Organization for the Prohibition of Chemical Weapons - lessons learned from the U.S. program of technical assistance to IAEA safeguards. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Defense Nuclear Agency is sponsoring a technical study of the requirements of a vehicle to meet the OPCW`s future needs for enhanced chemical weapons verification capabilities. This report provides information about the proven mechanisms by which the U.S. provided both short- and long-term assistance to the IAEA to enhance its verification capabilities. Much of the technical assistance has generic application to international organizations verifying compliance with disarmament treaties or conventions. In addition, some of the equipment developed by the U.S. under the existing arrangements can be applied in the verification of other disarmament treaties or conventions. U.S. technical assistance to IAEA safeguards outside of the IAEA`s regular budget proved to be necessary. The U.S. technical assistance was successful in improving the effectiveness of IAEA safeguards for its most urgent responsibilities and in providing the technical elements for increased IAEA {open_quotes}readiness{close_quotes} for the postponed responsibilities deemed important for U.S. policy objectives. Much of the technical assistance was directed to generic subjects and helped to achieve a system of international verification. It is expected that the capabilities of the Organization for the Prohibition of Chemical Weapons (OPCW) to verify a state`s compliance with the {open_quotes}Chemical Weapons Convention{close_quotes} will require improvements. This report presents 18 important lessons learned from the experience of the IAEA and the U.S. Program of Technical Assistance to IAEA Safeguards (POTAS), organized into three tiers. Each lesson is presented in the report in the context of the difficulty, need and history in which the lesson was learned. Only the most important points are recapitulated in this executive summary.

  17. 48 CFR 1825.1101 - Acquisition of supplies.

    Science.gov (United States)

    2010-10-01

    ....225-8, Duty-Free Entry of Space Articles, in solicitations and contracts when the supplies that will... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Acquisition of supplies... ADMINISTRATION SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Solicitation Provisions and Contract Clauses 1825.1101...

  18. Private sector involvement in the US program of technical assistance to IAEA safeguards

    International Nuclear Information System (INIS)

    Pepper, S.E.; Epel, L.; Maise, G.; Reisman, A.; Skalyo, J.

    1995-01-01

    The US Program of Technical Assistance to IAEA Safeguards (POTAS) relies on technical expertise found in the U. S private and public sectors. Since 1993, the international Safeguards Project Office (ISPO) has sought to increase the role of the private sector in POTAS. ISPO maintains and continues to develop a database of US companies interested in providing technical expertise to the IAEA. This database is used by ISPO to find appropriate contractors to respond to IAEA requests for technical assistance when the assistance can be provided by the private sector. The private sector is currently providing support in the development of equipment, training, and procedure preparation. POTAS also supports the work of private consultants. This paper discusses ISPO's efforts to identify suitable vendors and discusses conditions that hinder more substantial involvement by the private sector. In addition, the paper will discuss selected projects that are currently in progress and identify common problems that impede the progress and success of tasks performed by the private sector

  19. An Innovative Marketing Model: Promoting Technical Programs by Conducting One-Day Conferences.

    Science.gov (United States)

    Petrosian, Anahid

    This document examines an innovative marketing strategy developed by South Texas Community College (STCC) to promote its technical programs. In 2000, STCC organized the "Business Conference Institute" to develop 1-day conferences with the Division of Business, Math & Sciences (DBMS). The creation of this Institute linked the College with the local…

  20. Performance Confirmation Data Acquisition System

    International Nuclear Information System (INIS)

    D.W. Markman

    2000-01-01

    The purpose of this analysis is to identify and analyze concepts for the acquisition of data in support of the Performance Confirmation (PC) program at the potential subsurface nuclear waste repository at Yucca Mountain. The scope and primary objectives of this analysis are to: (1) Review the criteria for design as presented in the Performance Confirmation Data Acquisition/Monitoring System Description Document, by way of the Input Transmittal, Performance Confirmation Input Criteria (CRWMS M and O 1999c). (2) Identify and describe existing and potential new trends in data acquisition system software and hardware that would support the PC plan. The data acquisition software and hardware will support the field instruments and equipment that will be installed for the observation and perimeter drift borehole monitoring, and in-situ monitoring within the emplacement drifts. The exhaust air monitoring requirements will be supported by a data communication network interface with the ventilation monitoring system database. (3) Identify the concepts and features that a data acquisition system should have in order to support the PC process and its activities. (4) Based on PC monitoring needs and available technologies, further develop concepts of a potential data acquisition system network in support of the PC program and the Site Recommendation and License Application

  1. 48 CFR 1852.235-73 - Final Scientific and Technical Reports.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Final Scientific and Technical Reports. 1852.235-73 Section 1852.235-73 Federal Acquisition Regulations System NATIONAL..., including recommendations and conclusions based on the experience and results obtained. The final report...

  2. 76 FR 3536 - Defense Federal Acquisition Regulation Supplement; Technical Amendments

    Science.gov (United States)

    2011-01-20

    ... concerns, HUBZone small business concerns, small disadvantaged business concerns, women-owned small... date, and revising paragraph (a)(10) to read as follows: 252.225-7009 Restriction on Acqusition of Certain Articles Containing Specialty Metals. * * * * * RESTRICTION ON ACQUISITION OF CERTAIN ARTICLES...

  3. Proposal on application of Russian technical facilities for International Mars Research Program for 2009 2015

    Science.gov (United States)

    Polishchuk, Georgy; Pichkhadze, Konstantin; Vorontsov, Victor; Pavel, Kazmerchuk

    2006-07-01

    Recently International Mars Research Program is widely discussed. Well-known initiative of President of the USA, recent progress of American and European scientists and engineers in implementation of “Mars Odyssey” and “Mars-Express” projects and Russian proposals on cooperation and participation in “Phobos Sample Return” mission declare every intention to join efforts in the ambitious Martian Program realization. The final goal of the program for nearly 15 20 years is landing of a man on the Martian surface. Before this event happens another critical stage will be Martian soil sample return. Within the next 10 years, apparently, a major task will be scale research by means of various types of technical facilities. A crucial issue for this research will be creation of research station network which would allow collecting information about planetary conditions at far-remote points. By this time within the frame of “Phobos Sample Return Program” to be launched in 2009 it is planned to deliver some meteorological mini-landers developed by the Russian and Finnish specialists on the Martian surface. From this point view it is also interesting to use balloons capable to cover considerable distance. Such proposals have been made by Russian side for “Scout” mission. European “Aurora” program also anticipates application of wide range of technical means to explore the Martian atmosphere and surface including inflatable devices. Thus, for the International Mars Exploration Program, it seems to be very prospective to use apart from launch vehicles, upper stages etc. such technical means as mini-stations, Mars rovers, penetrators, balloons, etc.

  4. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  5. Commercial Crew Program and the Safety Technical Review Board

    Science.gov (United States)

    Mullen, Macy

    2016-01-01

    The Commercial Crew Program (CCP) is unique to any other program office at NASA. After the agency suffered devastating budget cuts and the Shuttle Program retired, the U.S. gave up its human spaceflight capabilities. Since 2011 the U.S. has been dependent on Russia to transport American astronauts and cargo to the International Space Station (ISS) and back. NASA adapted and formed CCP, which gives private, domestic, aerospace companies unprecedented reign over America's next ride to space. The program began back in 2010 with 5 companies and is now in the final phase of certification with 2 commercial partners. The Commercial Crew Program is made up of 7 divisions, each working rigorously with the commercial providers to complete the certification phase. One of these 7 divisions is Systems Engineering and Integration (SE&I) which is partly comprised of the Safety Technical Review Board (STRB). The STRB is primarily concerned with mitigating improbable, but catastrophic hazards. It does this by identifying, managing, and tracking these hazards in reports. With the STRB being in SE&I, it significantly contributes to the overall certification of the partners' vehicles. After the partners receive agency certification approval, they will have the capability to provide the U.S. with a reliable, safe, and cost-effective means of human spaceflight and cargo transport to the ISS and back.

  6. 7 CFR 1735.76 - Acquisition of affiliates.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Acquisition of affiliates. 1735.76 Section 1735.76... AGRICULTURE GENERAL POLICIES, TYPES OF LOANS, LOAN REQUIREMENTS-TELECOMMUNICATIONS PROGRAM Acquisitions Involving Loan Funds § 1735.76 Acquisition of affiliates. A borrower shall not use RUS loan funds to acquire...

  7. Acquisition and Development of System Command (SYSCOM) Technical Manuals

    National Research Council Canada - National Science Library

    2003-01-01

    ... (NAVSEA) and Space and Naval Warfare Systems Command (SPAWAR). TMs are the primary information source for technical training, installation, operation, testing, maintenance, and repair associated with NAVSEA/SPAWAR systems or equipment...

  8. 48 CFR 2452.237-73 - Conduct of Work and Technical Guidance.

    Science.gov (United States)

    2010-10-01

    ... conditions of the contract. (c) The GTR will issue technical guidance in writing or, if issued orally, he/she... Technical Guidance. 2452.237-73 Section 2452.237-73 Federal Acquisition Regulations System DEPARTMENT OF... Provisions and Clauses 2452.237-73 Conduct of Work and Technical Guidance. As prescribed in 2437.110(d...

  9. Data Management Standards in Computer-aided Acquisition and Logistic Support (CALS)

    Science.gov (United States)

    Jefferson, David K.

    1990-01-01

    Viewgraphs and discussion on data management standards in computer-aided acquisition and logistic support (CALS) are presented. CALS is intended to reduce cost, increase quality, and improve timeliness of weapon system acquisition and support by greatly improving the flow of technical information. The phase 2 standards, industrial environment, are discussed. The information resource dictionary system (IRDS) is described.

  10. Technical Proposal Salton Sea Geothermal Power Pilot Plant Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1975-03-28

    The proposed Salton Sea Geothermal Power Pilot Plant Program comprises two phases. The objective of Phase 1 is to develop the technology for power generation from high-temperature, high-salinity geothermal brines existing in the Salton Sea known geothermal resources area. Phase 1 work will result in the following: (a) Completion of a preliminary design and cost estimate for a pilot geothermal brine utilization facility. (b) Design and construction of an Area Resource Test Facility (ARTF) in which developmental geothermal utilization concepts can be tested and evaluated. Program efforts will be divided into four sub-programs; Power Generation, Mineral Extraction, Reservoir Production, and the Area Resources Test Facility. The Power Generation Subprogram will include testing of scale and corrosion control methods, and critical power cycle components; power cycle selection based on an optimization of technical, environmental and economic analyses of candidate cycles; preliminary design of a pilot geothermal-electric generating station to be constructed in Phase 2 of this program. The Mineral Extraction Subprogram will involve the following: selection of an optimum mineral recovery process; recommendation of a brine clean-up process for well injection enhancement; engineering, construction and operation of mineral recovery and brine clean-up facilities; analysis of facility operating results from environmental, economical and technical point-of-view; preliminary design of mineral recovery and brine clean-up facilities of sufficient size to match the planned pilot power plant. The Reservoir Production Subprogram will include monitoring the operation and maintenance of brine production, handling and injection systems which were built with private funding in phase 0, and monitoring of the brine characteristics and potential subsidence effects during well production and injection. Based on the above, recommendations and specifications will be prepared for production and

  11. Establishing a scientific and technical information program: Planning and resource management

    Science.gov (United States)

    Blados, Walter R.

    1992-01-01

    In the last 50 years, technological advances have accelerated at a rate unprecedented in history. We are experiencing a tremendous expansion of scientific and technological effort in many directions, and the result is a fantastic increase in the accumulation of scientific and technical information (STI) and knowledge. An integral part of the research and development (R&D) process is the STI associated with it. STI is both a raw material (input) and a product (output) of this process. The topics addressed include the following: the value of STI, management of an STI program, program policy and guidance, organizational structure, data sources, training/orientation, and the current information environment.

  12. Gas supply for independent power projects: Drilling programs and reserve acquisitions

    International Nuclear Information System (INIS)

    Lambert, J.D.; Walker, R.K.

    1990-01-01

    Developers of gas-fired independent power projects, although drawn to gas as the fuel of choice for economic and environmental reasons, are finding the problem of cost-effective gas supply to be intractable. By one estimate, there are $6 billion worth of gas-fired projects languishing in the planning stage for want of long-term gas supply that is acceptable to project lenders. Worse still, as the authors are aware, some currently operating gas-fired projects lack such a supply, thus forcing the developer to rely on the spot market for gas as an interim (and unsatisfactory) solution. Although spot market prices in the deregulated natural gas industry have remained relatively low over several years, long-term gas supply has become problematic, particularly for power projects whose economics typically require an assured supply at a determined price over a multiyear period. In short, while there is an increasing demand for gas as a preferred source of fuel supply for power projects, there are discontinuities in the approaches taken to contracting for that supply by producers and developers. These concern primarily allocation of the risk of commodity-driven price increases during the term of the fuel supply contract. Without a means of accommodating price-related risk, the parties will inevitably find themselves at an impasse in contract negotiations. If there is a barrier to the independent power generation industry's vertical integration into gas production, it is the fundamental insularity of the two industries. As they have discovered, it may be indispensable for gas producers and power developers to employ intermediaries familiar with both industries in order to consummate appropriate joint-venture drilling programs and reserve acquisitions. Given the economic consequences of doing so successfully, however, they believe such programs and acquisitions may become an integral part of independent power developers' business strategy in the 1990s and beyond

  13. An Overview of Advanced Data Acquisition System (ADAS)

    Science.gov (United States)

    Mata, Carlos T.; Steinrock, T. (Technical Monitor)

    2001-01-01

    The paper discusses the following: 1. Historical background. 2. What is ADAS? 3. R and D status. 4. Reliability/cost examples (1, 2, and 3). 5. What's new? 6. Technical advantages. 7. NASA relevance. 8. NASA plans/options. 9. Remaining R and D. 10. Applications. 11. Product benefits. 11. Commercial advantages. 12. intellectual property. Aerospace industry requires highly reliable data acquisition systems. Traditional Acquisition systems employ end-to-end hardware and software redundancy. Typically, redundancy adds weight, cost, power consumption, and complexity.

  14. Measuring Acquisition Workforce Quality Through Dynamic Knowledge and Performance: An Exploratory Investigation to Interrelate Acquisition Knowledge with Process Maturity

    OpenAIRE

    Nissen, Mark E.; Rendon, Rene G.

    2013-01-01

    Acquisition Research Program Sponsored Report Series Approved for public release; distribution is unlimited. The efficacy of defense acquisition is highly dependent upon acquisition workforce quality, but assessing such quality remains a major challenge, particularly given the knowledge-intensive and dynamic nature of acquisition organizations and processes. Hence, it is difficult to gauge?much less predict?the impact of leadership interventions in terms of policy, process, reg...

  15. 49 CFR 24.102 - Basic acquisition policies.

    Science.gov (United States)

    2010-10-01

    ... valuation only if the offer to acquire the property is $10,000, or less. (See appendix A, § 24.102(n).) [70... Transportation Office of the Secretary of Transportation UNIFORM RELOCATION ASSISTANCE AND REAL PROPERTY ACQUISITION FOR FEDERAL AND FEDERALLY-ASSISTED PROGRAMS Real Property Acquisition § 24.102 Basic acquisition...

  16. Instructional Variables and Students' Acquisition of Employable ...

    African Journals Online (AJOL)

    This study focused on the impact of teacher quality, teaching methods, and access to training materials on students' acquisition of employable skills in vocational technical subjects, for self employment in Akwa Ibom State, Nigeria. Three questions and three hypotheses were formulated and tested in the study.

  17. Experience from the development of Point Lepreau's training program for technical support staff

    International Nuclear Information System (INIS)

    Turner, S.; Scott, K.

    2007-01-01

    The Training Department at the Point Lepreau GS has been developing and improving its training for technical support staff. A generic set of objectives are being used as the basis for a systematic approach to training. The program covers general and job specific knowledge and skills using a mix of classroom instruction, mentoring and continuing training seminars. This paper describes experience, success and the challenges in the development, delivery and evaluation of the training program. (author)

  18. Technical requirements for the actinide source-term waste test program

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, M.L.F.; Molecke, M.A.

    1993-10-01

    This document defines the technical requirements for a test program designed to measure time-dependent concentrations of actinide elements from contact-handled transuranic (CH TRU) waste immersed in brines similar to those found in the underground workings of the Waste Isolation Pilot Plant (WIPP). This test program wig determine the influences of TRU waste constituents on the concentrations of dissolved and suspended actinides relevant to the performance of the WIPP. These influences (which include pH, Eh, complexing agents, sorbent phases, and colloidal particles) can affect solubilities and colloidal mobilization of actinides. The test concept involves fully inundating several TRU waste types with simulated WIPP brines in sealed containers and monitoring the concentrations of actinide species in the leachate as a function of time. The results from this program will be used to test numeric models of actinide concentrations derived from laboratory studies. The model is required for WIPP performance assessment with respect to the Environmental Protection Agency`s 40 CFR Part 191B.

  19. Technical requirements for the actinide source-term waste test program

    International Nuclear Information System (INIS)

    Phillips, M.L.F.; Molecke, M.A.

    1993-10-01

    This document defines the technical requirements for a test program designed to measure time-dependent concentrations of actinide elements from contact-handled transuranic (CH TRU) waste immersed in brines similar to those found in the underground workings of the Waste Isolation Pilot Plant (WIPP). This test program wig determine the influences of TRU waste constituents on the concentrations of dissolved and suspended actinides relevant to the performance of the WIPP. These influences (which include pH, Eh, complexing agents, sorbent phases, and colloidal particles) can affect solubilities and colloidal mobilization of actinides. The test concept involves fully inundating several TRU waste types with simulated WIPP brines in sealed containers and monitoring the concentrations of actinide species in the leachate as a function of time. The results from this program will be used to test numeric models of actinide concentrations derived from laboratory studies. The model is required for WIPP performance assessment with respect to the Environmental Protection Agency's 40 CFR Part 191B

  20. Management of technical information department

    International Nuclear Information System (INIS)

    Kim, T. H.; Han, D. H.; Moon, H. W.

    1997-03-01

    This report introduces technical information activities in 1996. They are composed of basic tasks and applied tasks. 1. Basic activities - acquisition, cataloging, and Information services 2. Management of KAERI-TIPS (Technical Information Processing System) 3. Construction of the database for nuclear-related Information 4. Role of Specialized Nuclear Information Center in the field of nuclear energy and cooperation with INIS section of IAEA 5. Beside above activities, in 1996 TID homepage was opened and online document delivery service was provided. (author). 25 tabs., 17 figs

  1. Management of technical information department

    Energy Technology Data Exchange (ETDEWEB)

    Kim, T H; Han, D H; Moon, H W [and others

    1997-03-01

    This report introduces technical information activities in 1996. They are composed of basic tasks and applied tasks. 1. Basic activities - acquisition, cataloging, and Information services 2. Management of KAERI-TIPS (Technical Information Processing System) 3. Construction of the database for nuclear-related Information 4. Role of Specialized Nuclear Information Center in the field of nuclear energy and cooperation with INIS section of IAEA 5. Beside above activities, in 1996 TID homepage was opened and online document delivery service was provided. (author). 25 tabs., 17 figs.

  2. Training of technical staff and technical staff managers

    International Nuclear Information System (INIS)

    Moody, G.F.

    1991-01-01

    The purpose of Technical Staff and Technical Staff Managers training is to provide job skills enhancement to individuals selected to fill key technical positions within a nuclear utility. This training is unique in that unlike other training programs accredited by the National Academy for Nuclear Training, it does not lead to specific task qualification. The problems encountered when determining the student population and curriculum are a direct result of this major difference. Major problems encountered are determining who should attend the training, what amount of training is necessary and sufficient, and how to obtain the best feedback in order to effect substantive program improvements. These topics will be explored and possible solutions discussed

  3. Employers' Perception of Graduates with Entry-Level Technical Skills from Construction Industry Programs in Ghana and Nigeria

    Science.gov (United States)

    Acheampong, Philip

    2013-01-01

    The purpose of this comparative study was to identify the technical skills and abilities needed by prospective employees of construction industries in Ghana and Nigeria. Potential employees were defined here as recent graduates of construction industry programs with entry-level technical skills. The continuous growth in and expansion of these two…

  4. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  5. Emergency response facility technical data system of Taiwan Power Company

    International Nuclear Information System (INIS)

    Lin, E.; Liang, T.M.

    1987-01-01

    Taiwan Power Company (Taipower) has developed its emergency response facility program since 1981. This program is integrated with the following activities to enhance the emergency response capability of nuclear power plants: (1) survey of the plant instrumentation based on the requirements of R.G. 1.97; (2) improvement of plant specific emergency operating procedures based on the emergency response guidelines developed by the Owners group; (3) implementation of the detailed control room design review with the consideration of human engineering and task analysis; and (4) organization, staff and communication of emergency planning of nuclear power plant. The emergency response facility programs of Taipower are implemented in Chinshan (GE BWR4/MARK I), Kuosheng (GE BWR6/MARK III) and Maanshan (W PWR). The major items included in each program are: (1) to establish new buildings for On-Site Technical Support Center, Near-Site Emergency Operation Facility; (2) to establish an Emergency Executive Center at Taipower headquarters; (3) to establish the communication network between control room and emergency response facilities; and (4) to install a dedicated Emergency Response Facility Technical Data System (ERFTDS) for each plant. The ERFTDS provides the functions of data acquisition, data processing, data storage and display in meeting with the requirements of NUREG 0696. The ERFTDS is designed with plant specific requirements. These specific requirements are expected to be useful not only for the emergency condition but also for normal operation conditions

  6. Architecture of an acquisition system-multiprocessors

    International Nuclear Information System (INIS)

    Postec, H.

    1987-07-01

    To follow the huge increasing of concerned parameters in nuclear detection systems, acquisition systems become bigger and have to present very good rapidity performance. At Ganil, four detection systems have been set in Nautilus reaction chamber, that lead to experiment configurations with 700 parameters to process. In front of present acquisition system limitation, a device more relevant to lecture of a large number of channels show off necessary. Functionalities already operating in other systems and hardware already used have been chosen; specific technical solutions were aldo developed to use the most recent techniques and to take in account the four detection system structure of the device [fr

  7. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  8. Design and Assessment of an Associate Degree-Level Plant Operations Technical Education Program

    Science.gov (United States)

    Selwitz, Jason Lawrence

    2017-01-01

    Research was undertaken to develop and evaluate an associate degree-level technical education program in Plant Operations oriented towards training students in applied science, technology, engineering, and mathematics (STEM) skills and knowledge relevant to a spectrum of processing industries. This work focuses on four aspects of the curriculum…

  9. Data acquisition systems at Fermilab

    International Nuclear Information System (INIS)

    Votava, M.

    1999-01-01

    Experiments at Fermilab require an ongoing program of development for high speed, distributed data acquisition systems. The physics program at the lab has recently started the operation of a Fixed Target run in which experiments are running the DART[1] data acquisition system. The CDF and D experiments are preparing for the start of the next Collider run in mid 2000. Each will read out on the order of 1 million detector channels. In parallel, future experiments such as BTeV R ampersand D and Minos have already started prototype and test beam work. BTeV in particular has challenging data acquisition system requirements with an input rate of 1500 Gbytes/sec into Level 1 buffers and a logging rate of 200 Mbytes/sec. This paper will present a general overview of these data acquisition systems on three fronts those currently in use, those to be deployed for the Collider Run in 2000, and those proposed for future experiments. It will primarily focus on the CDF and D architectures and tools

  10. Modular Electric Vehicle Program (MEVP). Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The Modular Electric Vehicle Program (MEVP) was an EV propulsion system development program in which the technical effort was contracted by DOE to Ford Motor Company. The General Electric Company was a major subcontractor to Ford for the development of the electric subsystem. Sundstrand Power Systems was also a subcontractor to Ford, providing a modified gas turbine engine APU for emissions and performance testing as well as a preliminary design and producibility study for a Gas Turbine-APU for potential use in hybrid/electric vehicles. The four-year research and development effort was cost-shared between Ford, General Electric, Sundstrand Power Systems and DOE. The contract was awarded in response to Ford`s unsolicited proposal. The program objective was to bring electric vehicle propulsion system technology closer to commercialization by developing subsystem components which can be produced from a common design and accommodate a wide range of vehicles; i.e., modularize the components. This concept would enable industry to introduce electric vehicles into the marketplace sooner than would be accomplished via traditional designs in that the economies of mass production could be realized across a spectrum of product offerings. This would eliminate the need to dedicate the design and capital investment to a limited volume product offering which would increase consumer cost and/or lengthen the time required to realize a return on the investment.

  11. 48 CFR 301.604 - Training and certification of Contracting Officers' Technical Representatives.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Training and certification of Contracting Officers' Technical Representatives. 301.604 Section 301.604 Federal Acquisition..., Contracting Authority, and Responsibilities 301.604 Training and certification of Contracting Officers...

  12. Equipment acquisition plans for the SSCL magnet excitation power system

    International Nuclear Information System (INIS)

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment

  13. KENS data acquisition system KENSnet

    International Nuclear Information System (INIS)

    Arai, Masatoshi; Furusaka, Michihiro; Satoh, Setsuo; Johnson, M.W.

    1988-01-01

    The installation of a new data acquisition system KENSnet has been completed at the KENS neutron facility. For data collection, 160 Mbytes are necessary for temporary disk storage, and 1 MIPS of CPU is required. For the computing system, models were chosen from the VAX family of computers running their proprietary operating system VMS. The VMS operating system has a very user friendly interface, and is well suited to instrument control applications. New data acquisition electronics were developed. A gate module receives a signal of proton extraction time from the accelerator, and checks the veto signals from the sample environment equipment (vacuum, temperature, chopper phasing, etc.). Then the signal is issued to a delay-time module. A time-control module starts timing from the delayed start signal from the delay-time module, and distributes an encoded time-boundary address to memory modules at the preset times anabling the memory modules to accumulate data histograms. The data acquisition control program (ICP) and the general data analysis program (Genie) were both developed at ISIS, and have been installed in the new data acquisition system. They give the experimenter 'user-friendly' data acquisition and a good environment for data manipulation. The ICP controls the DAE and transfers the histogram data into the computers. (N.K.)

  14. U.S. Department of Energy Program of International Technical Cooperation for Research Reactor Utilization

    International Nuclear Information System (INIS)

    Chong, D.; Manning, M.; Ellis, R.; Apt, K.; Flaim, S.; Sylvester, K.

    2004-01-01

    The U.S. Department of Energy, National Nuclear Security Administration (DOE/NNSA) has initiated collaborations with the national nuclear authorities of Egypt, Peru, and Romania for the purpose of advancing the commercial potential and utilization of their respective research reactors. Under its Office of International Safeguards ''Sister Laboratory'' program, DOE/NNSA has undertaken numerous technical collaborations over the past decade intended to promote peaceful applications of nuclear technology. Among these has been technical assistance in research reactor applications, such as neutron activation analysis, nuclear analysis, reactor physics, and medical radioisotope production. The current collaborations are intended to provide the subject countries with a methodology for greater commercialization of research reactor products and services. Our primary goal is the transfer of knowledge, both in administrative and technical issues, needed for the establishment of an effective business plan and utilization strategy for the continued operation of the countries' research reactors. Technical consultation, cooperation, and the information transfer provided are related to: identification, evaluation, and assessment of current research reactor capabilities for products and services; identification of opportunities for technical upgrades for new or expanded products and services; advice and consultation on research reactor upgrades and technical modifications; characterization of markets for reactor products and services; identification of competition and estimation of potential for market penetration; integration of technical constraints; estimation of cash flow streams; and case studies

  15. Technical progress report for UTSI/CFFF MHD program completion and related activity

    International Nuclear Information System (INIS)

    Chapman, James N.; Muehlhauser, Joel W.

    1998-01-01

    Routine preventive maintenance of the DOE Coal Fired Flow Facility (CFFF) is being performed. Modernization programs, funded under subcontract from Foster Wheeler Development Corporation by the DOE HIPPS Program, have been completed on the coal processing system, the data acquisition and control system and the control room. Late in the quarter, all work was stopped on maintenance of the CFFF at DOE instruction. Environmental restoration actions continued with monitoring of groundwater wells and holding pond effluent. Progress is reported on the approved groundwater remediation plan. Actions are underway to dispose of spent seed/ash mixtures and excess coal remaining from the MHD POC program. The status of five (5) High Temperature Superconductor (HTS) projects is reported. A summary is included of the results attained with sol-gel experiments with buffer layers and YBCO. The status of the cost/performance study of electron beam and PLD deposition is pre-sented. A summary of work performed in diagnostics for real time control of HTS processes is presented

  16. TECHNICAL PROGRESS REPORT FOR UTSI/CFFF MHD PROGRAM COMPLETION AND RELATED ACTIVITIES

    Energy Technology Data Exchange (ETDEWEB)

    DR. JAMES N. CHAPMAN; DR. JOEL W. MUEHLHAUSER

    1998-10-23

    Routine preventive maintenance of the DOE Coal Fired Flow Facility (CFFF) is being performed. Modernization programs, funded under subcontract from Foster Wheeler Development Corporation by the DOE HIPPS Program, have been completed on the coal processing system, the data acquisition and control system and the control room. Late in the quarter, all work was stopped on maintenance of the CFFF at DOE instruction. Environmental restoration actions continued with monitoring of groundwater wells and holding pond effluent. Progress is reported on the approved groundwater remediation plan. Actions are underway to dispose of spent seed/ash mixtures and excess coal remaining from the MHD POC program. The status of five (5) High Temperature Superconductor (HTS) projects is reported. A summary is included of the results attained with sol-gel experiments with buffer layers and YBCO. The status of the cost/performance study of electron beam and PLD deposition is pre-sented. A summary of work performed in diagnostics for real time control of HTS processes is presented.

  17. Assisting People with Multiple Disabilities by Improving Their Computer Pointing Efficiency with an Automatic Target Acquisition Program

    Science.gov (United States)

    Shih, Ching-Hsiang; Shih, Ching-Tien; Peng, Chin-Ling

    2011-01-01

    This study evaluated whether two people with multiple disabilities would be able to improve their pointing performance through an Automatic Target Acquisition Program (ATAP) and a newly developed mouse driver (i.e. a new mouse driver replaces standard mouse driver, and is able to monitor mouse movement and intercept click action). Initially, both…

  18. 48 CFR 252.227-7027 - Deferred ordering of technical data or computer software.

    Science.gov (United States)

    2010-10-01

    ... technical data or computer software. 252.227-7027 Section 252.227-7027 Federal Acquisition Regulations... data or computer software. As prescribed at 227.7103-8(b), use the following clause: Deferred Ordering of Technical Data or Computer Software (APR 1988) In addition to technical data or computer software...

  19. The educational and technical courses in the ELT program in Turkey: Do they contribute to ICT skills?

    Directory of Open Access Journals (Sweden)

    Levent Uzun

    2016-12-01

    Full Text Available The present study investigated the contribution of the educational and technical courses in the English Language Teacher Training Program (ELTTP at universities in Turkey to the information and communication technologies (ICT knowledge and skills of the students. The participants were 74 teachers/trainees who were attending their last year in the Faculty of Education at Uludag University or graduates of the ELTTP from nine different universities in Turkey. The data were collected by a Likert scale questionnaire by which teacher trainees were asked to rate each course that fell under the specific group of educational or technical courses that they attended during their education; and by interviews through which participants were asked to evaluate to what degree the technical courses contributed to their ICT-informed personal and professional development, and whether they felt ready to employ ICT in their classes as teachers. Results revealed that neither the educational nor the technical courses supported the ICT knowledge and skills of the participants at a satisfactory level, suggesting that the pedagogical knowledge that teacher trainees receive during their education is not in parallel with the technical knowledge that in fact should facilitate the implementation of pedagogical skills in the current age of technology. The present study speculated that the insufficient technical knowledge of the field and underdeveloped technical skills result in evasion of technology use and innovation in education. The study ended with suggestions related to teacher training programs and to the philosophies and approaches to English Language Teaching education.

  20. Independent technical review of the Bin and Alcove test programs at the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1993-12-01

    This Independent Technical Review (ITR) assessed the need for and technical validity of the proposed Bin and Alcove test programs using TRU-waste at the WIPP site. The ITR Team recommends that the planned Bin and Alcove tests be abandoned, and that new activities be initiated in support of the WIPP regulatory compliance processes. Recommendations in this report offer an alternate path for expeditiously attaining disposal certification and permitting

  1. Program Baseline Change Control Procedure

    International Nuclear Information System (INIS)

    1993-02-01

    This procedure establishes the responsibilities and process for approving initial issues of and changes to the technical, cost, and schedule baselines, and selected management documents developed by the Office of Civilian Radioactive Waste Management (OCRWM) for the Civilian Radioactive Waste Management System. This procedure implements the OCRWM Baseline Management Plan and DOE Order 4700.1, Chg 1. It streamlines the change control process to enhance integration, accountability, and traceability of Level 0 and Level I decisions through standardized Baseline Change Proposal (BCP) forms to be used by the Level 0, 1, 2, and 3 Baseline Change Control Boards (BCCBs) and to be tracked in the OCRWM-wide Configuration Information System (CIS) Database.This procedure applies to all technical, cost, and schedule baselines controlled by the Energy System Acquisition Advisory Board (ESAAB) BCCB (Level 0) and, OCRWM Program Baseline Control Board (PBCCB) (Level 1). All baseline BCPs initiated by Level 2 or lower BCCBs, which require approval from ESAAB or PBCCB, shall be processed in accordance with this procedure. This procedure also applies to all Program-level management documents controlled by the OCRWM PBCCB

  2. Defense Acquisition Workforce: The Air Force Needs to Evaluate Changes in Funding for Civilians Engaged in Space Acquisition

    Science.gov (United States)

    2013-07-01

    1) revitalize the acquisition workforce; (2) improve the requirements generation process; (3) instill budget and financial DOD Acquisition...with our four recommended actions (see app . I). In concurring with our recommendations, DOD stated that the Air Force will evaluate the pilot program

  3. The Effects of Incentives in Acquisition Competition on Program Outcomes

    Science.gov (United States)

    2012-06-01

    organizational, management, and cultural issues (Madachy, EFFECTS OF INCENTIVES IN ACQUISITION COMPETITION 5 2008, Frangos , 1998). In the SEI’s direct...change from the task force on defense acquisition law and oversight Forrester, J. W. (1971). Principles of systems. Pegasus Communications. Frangos , S

  4. 78 FR 35877 - Applications for New Awards; Native Hawaiian Career and Technical Education Program

    Science.gov (United States)

    2013-06-14

    ... parents, including single pregnant women; (e) Displaced homemakers; and (f) Individuals with limited... organization could not use NHCTEP funds to provide child care for single parents if non-Federal funds... services for single parents participating in non-career and technical education programs and these services...

  5. Acquisition Management: Source Selection Procedures for the C-5 Avionics Modernization Program

    National Research Council Canada - National Science Library

    Granetto, Paul J; Neville, Douglas P; Mathews, Amy L; Thompson, Lashonda M; Burger, Michael T; Anderson, Lamar; Hepler, Michael T; Borrero, Karen M; Hart, Erin S

    2006-01-01

    ... (Acquisition, Technology, and Logistics) commissioned a study to review acquisition-related actions taken by the former Principal Deputy Assistant Secretary of the Air Force for Acquisition and Management (Principal Deputy...

  6. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993

  7. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  8. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  9. Modular data acquisition system and its use in gas-filled detector readout at ESRF

    Science.gov (United States)

    Sever, F.; Epaud, F.; Poncet, F.; Grave, M.; Rey-Bakaikoa, V.

    1996-09-01

    Since 1992, 18 ESRF beamlines are open to users. Although the data acquisition requirements vary a lot from one beamline to another, we are trying to implement a modular data acquisition system architecture that would fit with the maximum number of acquisition projects at ESRF. Common to all of these systems are large acquisition memories and the requirement to visualize the data during an acquisition run and to transfer them quickly after the run to safe storage. We developed a general memory API handling the acquisition memory and its organization and another library that provides calls for transferring the data over TCP/IP sockets. Interesting utility programs using these libraries are the `online display' program and the `data transfer' program. The data transfer program as well as an acquisition control program rely on our well-established `device server model', which was originally designed for the machine control system and then successfully reused in beamline control systems. In the second half of this paper, the acquisition system for a 2D gas-filled detector is presented, which is one of the first concrete examples using the proposed modular data acquisition architecture.

  10. Review of scientific and technical options for the Superconducting Super Collider Program

    International Nuclear Information System (INIS)

    Dombeck, T.

    1993-11-01

    This document is a review of options for the Superconducting Super Collider (SSC) Program. It is the result of an informal study by an ad-hoc working group consisting of Laboratory physicists and engineers who investigated the physics and technical implications of a number of possible alternative SSC programs. Previous studies have shown, and early in this study it was confirmed, that a collider of approximately 20 TeV protons on 20 TeV protons with a luminosity of 10 33 cm -2 s -1 at each interaction region is needed to support a physics program that is guaranteed to answer existing particle physics questions and make new discoveries. Therefore, all options considered in this document were consistent with attainment of these original goals for the SSC. One promising option considered was a program of colliding anti-protons on protons as a possible means to reduce the cost of the SSC by eliminating one of the Collider rings. However, the luminosity requirements to obtain the SSC physics goals remains the same as for protons colliding with protons and this study confirms that even though progress has been made over the last ten years in obtaining the high intensity anti-proton beams necessary, a luminosity higher than 10 32 cannot be guaranteed. Other options were examined to see what advantages could be derived by departing from the SSC baseline program, either in schedule, in parameters, by staging, or by combinations of these options. Even though we considered re-examination of the cost of the baseline program to be beyond the scope of this document, differential cost savings were estimated. Finally, a brief survey of progress over the last ten years in various technical areas that might lead to more cost effective engineering designs was included in this study, such as higher magnetic field magnets resulting from lower operating temperatures or higher current-carrying superconducting materials

  11. Review of scientific and technical options for the Superconducting Super Collider Program

    Energy Technology Data Exchange (ETDEWEB)

    Dombeck, T.

    1993-11-01

    This document is a review of options for the Superconducting Super Collider (SSC) Program. It is the result of an informal study by an ad-hoc working group consisting of Laboratory physicists and engineers who investigated the physics and technical implications of a number of possible alternative SSC programs. Previous studies have shown, and early in this study it was confirmed, that a collider of approximately 20 TeV protons on 20 TeV protons with a luminosity of 10{sup 33} cm{sup {minus}2}s{sup {minus}1} at each interaction region is needed to support a physics program that is guaranteed to answer existing particle physics questions and make new discoveries. Therefore, all options considered in this document were consistent with attainment of these original goals for the SSC. One promising option considered was a program of colliding anti-protons on protons as a possible means to reduce the cost of the SSC by eliminating one of the Collider rings. However, the luminosity requirements to obtain the SSC physics goals remains the same as for protons colliding with protons and this study confirms that even though progress has been made over the last ten years in obtaining the high intensity anti-proton beams necessary, a luminosity higher than 10{sup 32} cannot be guaranteed. Other options were examined to see what advantages could be derived by departing from the SSC baseline program, either in schedule, in parameters, by staging, or by combinations of these options. Even though we considered re-examination of the cost of the baseline program to be beyond the scope of this document, differential cost savings were estimated. Finally, a brief survey of progress over the last ten years in various technical areas that might lead to more cost effective engineering designs was included in this study, such as higher magnetic field magnets resulting from lower operating temperatures or higher current-carrying superconducting materials.

  12. Atmospheric Effects of Nuclear Energy Centers (AENEC) Program. Annual technical progress report, July 1975--September 1976

    International Nuclear Information System (INIS)

    Patrinos, A.A.; Hoffman, H.W.

    1977-04-01

    The Technical Memorandum contains information of a preliminary nature from the six participants of the Program describing their activities and presenting the results obtained during the reporting period. The birth of the Program, its definition and evolution are described, and a complete breakdown of responsibilities and tasks assigned to the six AENEC participants is presented

  13. Filling the Gap: Integrating STEM into Career and Technical Education Middle School Programs

    Science.gov (United States)

    Wu-Rorrer, Ray

    2017-01-01

    The field of STEM education is an educational framework that has surged in application over the past decade. Science, Technology, Engineering, and Math (STEM) is infused in nearly every facet of our society. Filling the gap of current research in middle school career and technical education (CTE) and STEM programs is important as traditional CTE…

  14. FY 2016 Grant Announcement: FY 2016 Technical Analysis and Programmatic Evaluation Support to the Chesapeake Bay Program Partnership

    Science.gov (United States)

    The U.S. Environmental Protection Agency’s Chesapeake Bay Program Office is announcing a Request for Proposals for applicants to provide the Chesapeake Bay Program partners with a proposal(s) for providing technical analysis and programmatic evaluation

  15. Technical Note: Interleaved Bipolar Acquisition and Low-rank Reconstruction for Water-Fat Separation in MRI.

    Science.gov (United States)

    Cho, JaeJin; Park, HyunWook

    2018-05-17

    To acquire interleaved bipolar data and reconstruct the full data using low-rank property for water fat separation. Bipolar acquisition suffers from issues related to gradient switching, the opposite gradient polarities, and other system imperfections, which prevent accurate water-fat separation. In this study, an interleaved bipolar acquisition scheme and a low-rank reconstruction method were proposed to reduce issues from the bipolar gradients while achieving a short imaging time. The proposed interleaved bipolar acquisition scheme collects echo-time signals from both gradient polarities; however, the sequence increases the imaging time. To reduce the imaging time, the signals were subsampled at every dimension of k-space. The low-rank property of the bipolar acquisition was defined and exploited to estimate the full data from the acquired subsampled data. To eliminate the bipolar issues, in the proposed method, the water-fat separation was performed separately for each gradient polarity, and the results for the positive and negative gradient polarities were combined after the water-fat separation. A phantom study and in-vivo experiments were conducted on a 3T Siemens Verio system. The results for the proposed method were compared with the results of the fully sampled interleaved bipolar acquisition and Soliman's method, which was the previous water-fat separation approach for reducing the issues of bipolar gradients and accelerating the interleaved bipolar acquisition. The proposed method provided accurate water and fat images without the issues of bipolar gradients and demonstrated a better performance compared with the results of the previous methods. The water-fat separation using the bipolar acquisition has several benefits including a short echo-spacing time. However, it suffers from bipolar-gradient issues such as strong gradient switching, system imperfection, and eddy current effects. This study demonstrated that accurate water-fat separated images can

  16. Technical Excellence and Communication: The Cornerstones for Successful Safety and Mission Assurance Programs

    Science.gov (United States)

    Malone, Roy W.; Livingston, John M.

    2010-01-01

    The paper describes the role of technical excellence and communication in the development and maintenance of safety and mission assurance programs. The Marshall Space Flight Center (MSFC) Safety and Mission Assurance (S&MA) organization is used to illustrate philosophies and techniques that strengthen safety and mission assurance efforts and that contribute to healthy and effective organizational cultures. The events and conditions leading to the development of the MSFC S&MA organization are reviewed. Historic issues and concerns are identified. The adverse effects of resource limitations and risk assessment roles are discussed. The structure and functions of the core safety, reliability, and quality assurance functions are presented. The current organization s mission and vision commitments serve as the starting points for the description of the current organization. The goals and objectives are presented that address the criticisms of the predecessor organizations. Additional improvements are presented that address the development of technical excellence and the steps taken to improve communication within the Center, with program customers, and with other Agency S&MA organizations.

  17. Technical Excellence and Communication, the Cornerstones for Successful Safety and Mission Assurance Programs

    Science.gov (United States)

    Malone, Roy W.; Livingston, John M.

    2010-09-01

    The paper describes the role of technical excellence and communication in the development and maintenance of safety and mission assurance programs. The Marshall Space Flight Center(MSFC) Safety and Mission Assurance(S&MA) organization is used to illustrate philosophies and techniques that strengthen safety and mission assurance efforts and that contribute to healthy and effective organizational cultures. The events and conditions leading to the development of the MSFC S&MA organization are reviewed. Historic issues and concerns are identified. The adverse effects of resource limitations and risk assessment roles are discussed. The structure and functions of the core safety, reliability, and quality assurance functions are presented. The current organization’s mission and vision commitments serve as the starting points for the description of the current organization. The goals and objectives are presented that address the criticisms of the predecessor organizations. Additional improvements are presented that address the development of technical excellence and the steps taken to improve communication within the Center, with program customers, and with other Agency S&MA organizations.

  18. Critical Success Factors and Their Application to DOD Weapon System Acquisition

    National Research Council Canada - National Science Library

    Harris, Chad M

    2006-01-01

    .... The goal of this project was to identify Critical Success Factors and determine if they could be applied to DoD acquisition programs in order to improve the acquisition process and provide program...

  19. (Technical and engineering support for the Office of Industrial Programs)

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    As of April 19, 1991, technical, operational and analytic support and assistance to the offices and divisions of the Office of Renewable Energy, under contract DE-AC01-86CE30844 was completed. The overall work effort, initiated February 20, 1986, was characterized by timely, comprehensive, high quality, professional responsiveness to a broad range of renewable energy program operational support requirements. These are no instances of failure to respond, nor unacceptable response, during the five-year period. The technology program areas covered are Solar Buildings Technology, Wind Energy Technology, Photovoltaic Energy Technology, Geothermal Energy Technology, Biofuels and Municipal Waste Technology, Solar Thermal Technology, Hydropower Energy Technology, Ocean Energy Technology, and Electric Energy Systems and Energy Storage. The analytical and managerial support provided to the office and staff of the Deputy Assistant Secretary for Renewable Energy enabled a comprehensive evaluation of program and policy alternatives, and the selection and execution of appropriate courses of action from amongst those alternatives. Largely through these means the Office has been able to maintain continuity and a meaningful program thrust through the vacillations of policies and budgets that it has experienced over that it has experienced over the past five years. Appended are summaries of support activities within each of the individual technology program areas, as well as a complete listing of all project deliverables and due-dates for each submittal under the contract.

  20. [Technical and engineering support for the Office of Industrial Programs

    International Nuclear Information System (INIS)

    1991-01-01

    As of April 19, 1991, technical, operational and analytic support and assistance to the offices and divisions of the Office of Renewable Energy, under contract DE-AC01-86CE30844 was completed. The overall work effort, initiated February 20, 1986, was characterized by timely, comprehensive, high quality, professional responsiveness to a broad range of renewable energy program operational support requirements. These are no instances of failure to respond, nor unacceptable response, during the five-year period. The technology program areas covered are Solar Buildings Technology, Wind Energy Technology, Photovoltaic Energy Technology, Geothermal Energy Technology, Biofuels and Municipal Waste Technology, Solar Thermal Technology, Hydropower Energy Technology, Ocean Energy Technology, and Electric Energy Systems and Energy Storage. The analytical and managerial support provided to the office and staff of the Deputy Assistant Secretary for Renewable Energy enabled a comprehensive evaluation of program and policy alternatives, and the selection and execution of appropriate courses of action from amongst those alternatives. Largely through these means the Office has been able to maintain continuity and a meaningful program thrust through the vacillations of policies and budgets that it has experienced over that it has experienced over the past five years. Appended are summaries of support activities within each of the individual technology program areas, as well as a complete listing of all project deliverables and due-dates for each submittal under the contract

  1. Data acquisition for PLT

    International Nuclear Information System (INIS)

    Thompson, P.A.

    1975-01-01

    DA/PLT, the data acquisition system for the Princeton Large Torus (PLT) fusion research device, consists of a PDP-10 host computer, five satellite PDP-11s connected to the host by a special high-speed interface, miscellaneous other minicomputers and commercially supplied instruments, and much PPPL produced hardware. The software consists of the standard PDP-10 monitor with local modifications and the special systems and applications programs to customize the DA/PLT for the specific job of supporting data acquisition, analysis, display, and archiving, with concurrent off-line analysis, program development, and, in the background, general batch and timesharing. Some details of the over-all architecture are presented, along with a status report of the different PLT experiments being supported

  2. Computer-based programs on acquisition of reading skills in schoolchildren (review of contemporary foreign investigations

    Directory of Open Access Journals (Sweden)

    Prikhoda N.A.

    2015-03-01

    Full Text Available The article presents a description of 17 computer-based programs, which were used over the last 5 years (2008—2013 in 15 studies of computer-assisted reading instruction and intervention of schoolchildren. The article includes a description of specificity of various terms used in the above-mentioned studies and the contents of training sessions. The article also carries out a brief analysis of main characteristics of computer-based techniques — language of instruction, age and basic characteristics of students, duration and frequency of training sessions, dependent variables of education. Special attention is paid to efficiency of acquisition of different reading skills through computer-based programs in comparison to traditional school instruction.

  3. Components Needed for the Design of a Sustainable Career and Technical Education Program

    Science.gov (United States)

    Lassiter, Vann Mizzelle

    2012-01-01

    As education has changed to meet the needs of society and has been shaped by the enactment of new laws, various aspects included under the massive umbrella of education have also changed to maintain momentum One such educational program is career and technical education (CTE). Changes to CTE have been made to continually meet the needs of all…

  4. Technical Leadership Development Program-Year 3

    Science.gov (United States)

    2012-08-30

    be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT...NASA6, Nokia , BAE Systems, the DoD, and the Australian government to develop our initial competency model. These models were discussed in deliverable...UNCLASSIFIED 17 solutions to pursue and why they should be built. 2. Help teams solve technical problems holistically, overcoming technical and non

  5. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts. Volume 3; Program Cost Estimates

    Science.gov (United States)

    Levack, Daniel J. H.

    2000-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

  6. Does personality influence job acquisition and tenure in people with severe mental illness enrolled in supported employment programs?

    Science.gov (United States)

    Fortin, Guillaume; Lecomte, Tania; Corbière, Marc

    2017-06-01

    When employment difficulties in people with severe mental illness (SMI) occur, it could be partly linked to issues not specific to SMI, such as personality traits or problems. Despite the fact that personality has a marked influence on almost every aspect of work behavior, it has scarcely been investigated in the context of employment for people with SMI. We aimed to evaluate if personality was more predictive than clinical variables of different competitive work outcomes, namely acquisition of competitive employment, delay to acquisition and job tenure. A sample of 82 people with a SMI enrolled in supported employment programs (SEP) was recruited and asked to complete various questionnaires and interviews. Statistical analyses included logistic regressions and survival analyses (Cox regressions). Prior employment, personality problems and negative symptoms are significantly related to acquisition of a competitive employment and to delay to acquisition whereas the conscientiousness personality trait was predictive of job tenure. Our results point out the relevance of personality traits and problems as predictors of work outcomes in people with SMI registered in SEP. Future studies should recruit larger samples and also investigate these links with other factors related to work outcomes.

  7. Community Building Services Training Program: A Model Training Program to Provide Technical Training for Minority Adults in Construction, Building Maintenance,and Property Management. Final Report.

    Science.gov (United States)

    Community Building Maintenance Corp., Chicago, IL.

    A demonstration program, administered by a community based building maintenance, management, and construction corporation, was developed to provide technical training for minority adults in construction, building maintenance, and property management in the Chicago area. The program was concerned with seeking solutions to the lack of housing, job…

  8. Acquisition War-Gaming Technique for Acquiring Future Complex Systems: Modeling and Simulation Results for Cost Plus Incentive Fee Contract

    Directory of Open Access Journals (Sweden)

    Tien M. Nguyen

    2018-03-01

    Full Text Available This paper provides a high-level discussion and propositions of frameworks and models for acquisition strategy of complex systems. In particular, it presents an innovative system engineering approach to model the Department of Defense (DoD acquisition process and offers several optimization modules including simulation models using game theory and war-gaming concepts. Our frameworks employ Advanced Game-based Mathematical Framework (AGMF and Unified Game-based Acquisition Framework (UGAF, and related advanced simulation and mathematical models that include a set of War-Gaming Engines (WGEs implemented in MATLAB statistical optimization models. WGEs are defined as a set of algorithms, characterizing the Program and Technical Baseline (PTB, technology enablers, architectural solutions, contract type, contract parameters and associated incentives, and industry bidding position. As a proof of concept, Aerospace, in collaboration with the North Carolina State University (NCSU and University of Hawaii (UH, successfully applied and extended the proposed frameworks and decision models to determine the optimum contract parameters and incentives for a Cost Plus Incentive Fee (CPIF contract. As a result, we can suggest a set of acquisition strategies that ensure the optimization of the PTB.

  9. Strengthening the material-technical base of modern agrarian ...

    African Journals Online (AJOL)

    At present, in agriculture there is a tendency of equipment obsolescence and break ... by means of acquisition of high-energy, high-performance equipment and the ... and to make recommendations for the development of technical capacity.

  10. Seizing the Future: How Ohio's Career-Technical Education Programs Fuse Academic Rigor and Real-World Experiences to Prepare Students for College and Careers

    Science.gov (United States)

    Guarino, Heidi; Yoder, Shaun

    2015-01-01

    "Seizing the Future: How Ohio's Career and Technical Education Programs Fuse Academic Rigor and Real-World Experiences to Prepare Students for College and Work," demonstrates Ohio's progress in developing strong policies for career and technical education (CTE) programs to promote rigor, including college- and career-ready graduation…

  11. Meeting the Needs of Career and Technical Education: Observations from Graduates of a High School Health Science Program

    Science.gov (United States)

    Avey, Matthew R.

    2012-01-01

    Career and Technical education has been around for some time, and has often been shaped by the current economic landscape of the country. While current evolving trends focus on relevance for students in the school setting, a coexistence with college preparation curriculum is now the new trend in modern technical education. New programs have…

  12. The role of non-technical skills in surgery.

    Science.gov (United States)

    Agha, Riaz A; Fowler, Alexander J; Sevdalis, Nick

    2015-12-01

    Non-technical skills are of increasing importance in surgery and surgical training. A traditional focus on technical skills acquisition and competence is no longer enough for the delivery of a modern, safe surgical practice. This review discusses the importance of non-technical skills and the values that underpin successful modern surgical practice. This narrative review used a number of sources including written and online, there was no specific search strategy of defined databases. Modern surgical practice requires; technical and non-technical skills, evidence-based practice, an emphasis on lifelong learning, monitoring of outcomes and a supportive institutional and health service framework. Finally these requirements need to be combined with a number of personal and professional values including integrity, professionalism and compassionate, patient-centred care.

  13. The role of non-technical skills in surgery

    Science.gov (United States)

    Agha, Riaz A.; Fowler, Alexander J.; Sevdalis, Nick

    2015-01-01

    Non-technical skills are of increasing importance in surgery and surgical training. A traditional focus on technical skills acquisition and competence is no longer enough for the delivery of a modern, safe surgical practice. This review discusses the importance of non-technical skills and the values that underpin successful modern surgical practice. This narrative review used a number of sources including written and online, there was no specific search strategy of defined databases. Modern surgical practice requires; technical and non-technical skills, evidence-based practice, an emphasis on lifelong learning, monitoring of outcomes and a supportive institutional and health service framework. Finally these requirements need to be combined with a number of personal and professional values including integrity, professionalism and compassionate, patient-centred care. PMID:26904193

  14. Annual technical meeting of the NRC cooperative severe accident research program

    International Nuclear Information System (INIS)

    Silver, E.G.

    1993-01-01

    This brief report summarizes the 1992 annual technical meeting of the NRC Cooperative Severe Accident Research Program (CSARP-92) held at the Hyatt Regency Hotel in Bethesda, Maryland, May 4-8, 1992. The report is taken mainly from coverage of the meeting published in the June 5, 1992, issue of Atomic Energy Clearinghouse. Results of this meeting are formalized at the Water Reactor Safety Information Meetings (WRSIM) that are held annually in October. Nuclear Safety summarizes the annual WRSIM meetings and provides a list of the presentations that were given. Interested readers are encouraged to review listed topics to identify specific topic areas in severe accident research. Sessions were held on in-vessel core melt progression; fuel-coolant interactions; fission-product behavior; direct containment heating; and severe accident code development, assessment, and validation. Summaries of the individual technical sessions and the current state of the art in these areas were given by the chairmen

  15. Modular data acquisition system and its use in gas-filled detector readout at ESRF

    International Nuclear Information System (INIS)

    Sever, F.; Epaud, F.; Poncet, F.; Grave, M.; Rey-Bakaikoa, V.

    1996-01-01

    Since 1992, 18 ESRF beamlines are open to users. Although the data acquisition requirements vary a lot from one beamline to another, we are trying to implement a modular data acquisition system architecture that would fit with the maximum number of acquisition projects at ESRF. Common to all of these systems are large acquisition memories and the requirement to visualize the data during an acquisition run and to transfer them quickly after the run to safe storage. We developed a general memory API handling the acquisition memory and its organization and another library that provides calls for transferring the data over TCP/IP sockets. Interesting utility programs using these libraries are the open-quote online display close-quote program and the open-quote data transfer close-quote program. The data transfer program as well as an acquisition control program rely on our well-established open-quote device server model close-quote, which was originally designed for the machine control system and then successfully reused in beamline control systems. In the second half of this paper, the acquisition system for a 2D gas-filled detector is presented, which is one of the first concrete examples using the proposed modular data acquisition architecture. copyright 1996 American Institute of Physics

  16. Technical Leadership Development Program

    Science.gov (United States)

    2010-12-13

    the traditional tenets of leadership and management , systems thinking, understanding SOS issues, and thinking and acting holistically. Our research...international element 2.0 Enterprise Leadership and Management UNCLASSIFIED Contract Number: H98230-08-D-0171 DO 002. TO002, RT 004 Report No...mechanisms for leadership of the overall technical effort, for systems engineering, for requirements, management , and for systems integration. o Develop

  17. Technical Performance Measurement, Earned Value, and Risk Management: An Integrated Diagnostic Tool for Program Management

    National Research Council Canada - National Science Library

    Pisano, N

    2002-01-01

    ...(A)), is known as the Navy PEO(A) Technical Performance Measurement (TPM) System. A retrospective analysis was conducted on the T45TS Cockpit-21 program and real-time test implementations are being conducted on the Federal Aviation Administration's (FAA...

  18. Risk Management Program Application for the Component Test Capability

    International Nuclear Information System (INIS)

    Stephanie L. Austad; Jeffrey D. Bryan

    2009-01-01

    This paper documents the application of the risk management program requirements to Component Test Capability (CTC) Project activities for each CTC alternative. In particular, DOE O 413.3A, 'Program and Project Management for the Acquisition of Capital Assets,' and DOE G 413.3-7, 'Risk Management Guide for Project Management,' will apply in the event that Alternative 4, Single, Standalone Component Test Facility (CTF), is selected and approved. As such, it is advisable to begin planning to meet the associated Department of Energy (DOE) requirements and guidance as early in the acquisition process as practicable. This white paper is intended to assist in this planning and to support associated decision-making activities. Nontechnical risks associated with each alternative will be identified to support the Next Generation Nuclear Plant (NGNP) CTC alternatives analysis. Technical risks are assumed to be addressed through the Technology Development Risk Management modeling process and are inherent to the alternatives

  19. An Evaluation of the Employee Training and Development Process for Nicolet Area Technical College's Basic Education Program.

    Science.gov (United States)

    Karl, Luis C.

    The adult basic education (ABE) program at Nicolet Area Technical College (NATC) evaluated its training and development (T&D) process for new basic education instructors. The study gathered monitoring and screening criteria that addressed valuable components for use in an instrument for validating effectiveness of the ABE program (T&D)…

  20. OSH technical reference manual

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    In an evaluation of the Department of Energy (DOE) Occupational Safety and Health programs for government-owned contractor-operated (GOCO) activities, the Department of Labor`s Occupational Safety and Health Administration (OSHA) recommended a technical information exchange program. The intent was to share written safety and health programs, plans, training manuals, and materials within the entire DOE community. The OSH Technical Reference (OTR) helps support the secretary`s response to the OSHA finding by providing a one-stop resource and referral for technical information that relates to safe operations and practice. It also serves as a technical information exchange tool to reference DOE-wide materials pertinent to specific safety topics and, with some modification, as a training aid. The OTR bridges the gap between general safety documents and very specific requirements documents. It is tailored to the DOE community and incorporates DOE field experience.

  1. Acquisition of reliable vacuum hardware for large accelerator systems

    International Nuclear Information System (INIS)

    Welch, K.M.

    1996-01-01

    Credible and effective communications prove to be the major challenge in the acquisition of reliable vacuum hardware. Technical competence is necessary but not sufficient. We must effectively communicate with management, sponsoring agencies, project organizations, service groups, staff and with vendors. Most of Deming's 14 quality assurance tenets relate to creating an enlightened environment of good communications. All projects progress along six distinct, closely coupled, dynamic phases; all six phases are in a state of perpetual change. These phases and their elements are discussed, with emphasis given to the acquisition phase and its related vocabulary. (author)

  2. Program summary for the Civilian Reactor Development Program

    International Nuclear Information System (INIS)

    1982-07-01

    This Civilian Reactor Development Program document has the prime purpose of summarizing the technical programs supported by the FY 1983 budget request. This section provides a statement of the overall program objectives and a general program overview. Section II presents the technical programs in a format intended to show logical technical interrelationships, and does not necessarily follow the structure of the formal budget presentation. Section III presents the technical organization and management structure of the program

  3. 78 FR 15008 - Applications for New Awards; Native American Career and Technical Education Program (NACTEP...

    Science.gov (United States)

    2013-03-08

    ... DEPARTMENT OF EDUCATION Applications for New Awards; Native American Career and Technical Education Program (NACTEP); Correction AGENCY: Office of Vocational and Adult Education, Department of... the Code of Federal Regulations is available via the Federal Digital System at: www.gpo.gov/fdsys . At...

  4. Data acquisition and processing software for linear PSD based neutron diffractometers

    International Nuclear Information System (INIS)

    Pande, S.S.; Borkar, S.P.; Ghodgaonkar, M.D.

    2003-01-01

    As a part of data acquisition system for various single and multi-PSD diffractometers software is developed to acquire the data and support the requirements of diffraction experiments. The software is a front-end Windows 98 application on PC and a transputer program on the MPSD card. The front-end application provides entire user interface required for data acquisition, control, presentation and system setup. Data is acquired and the diffraction spectra are generated in the transputer program. All the required hardware control is also implemented in the transputer program. The two programs communicate using a device driver named VTRANSPD. The software plays a vital role in customizing and integrating the data acquisition system for various diffractometer setups. Also the experiments are effectively automated in the software which has helped in making best use of available beam time. These and other features of the data acquisition and processing software are presented here. This software is being used along with the data acquisition system at a few single PSD and multi-PSD diffractometers. (author)

  5. Systematic review and meta-analysis of the role of mental training in the acquisition of technical skills in surgery.

    Science.gov (United States)

    Rao, Ahsan; Tait, Ian; Alijani, Afshin

    2015-09-01

    Mental training is rehearsal of mental imagery without physically performing the task. The aim of the study was to perform systematic review and meta-analysis on all the available data to evaluate the role of mental training in the acquisition of surgical technical skills. The following search databases were used: EMBASE, MEDLINE, Web of Science, Clinicaltrials.gov.uk, SIGN guidelines, NICE guidelines, and Cochrane review register. Meta-analysis was performed using Revman 5.2 statistical software. There were a total of 9 randomized controlled trials with 474 participants, of which 189 participants received mental training. Five randomized controlled trials concluded positive impact of mental training. Mental training group did not show any significant improvement in overall performance of the task carried in each study (P = .06). Mental training can be used as an important supplementary tool in learning surgical skills when run in parallel with physical training and applied to trainees with some experience of the skill. Copyright © 2015 Elsevier Inc. All rights reserved.

  6. Applying Rapid Acquisition Policy Lessons for Defense Innovation

    Science.gov (United States)

    2017-12-21

    import- ing Silicon Valley- style innovation practices to its acquisition process, it is im- portant to assess an organization’s ability to...these efforts. Keywords: defense acquisition, defense procurement, rapid acquisition, de- fense innovation, program management , organizational culture...Device De- feat Organization, JIEDDO, Rapid Equipping Force, REF Silicon Valley- style innovation is a hot topic in the Department of De-fense (DOD). For

  7. Data acquisition and test system software

    International Nuclear Information System (INIS)

    Bourgeois, N.A. Jr.

    1979-03-01

    Sandia Laboratories has been assigned the task by the Base and Installation Security Systems (BISS) Program Office to develop various aspects of perimeter security systems. One part of this effort involves the development of advanced signal processing techniques to reduce the false and nuisance alarms from sensor systems while improving the probability of intrusion detection. The need existed for both data acquisition hardware and software. Also, the hardware is used to implement and test the signal processing algorithms in real time. The hardware developed for this signal processing task is the Data Acquisition and Test System (DATS). The programs developed for use on DATS are described. The descriptions are taken directly from the documentation included within the source programs themselves

  8. Expansion of the data acquisition system for the 20 MV tandem accelerator

    International Nuclear Information System (INIS)

    Tomita, Yoshiaki

    1981-02-01

    This report describes an expansion of the program of the data acquisition system for the 20 MV tandem accelerator. By the present expansion it became possible to change the accuisition mode or to use non-standard CAMAC modules with partial modification of the program according to well defined prescriptions. The modification can be made by writing microprograms for the MBD or appending subroutines for the reduced spectra in the LIST mode data acquisition. The new program can handle up to 32 ADC's in the standard LIST mode data acquisition. The present expansion aimed to increase the flexibility in data acquisition. It can also be applied to control experimental devices. (author)

  9. Lowest Price, Technically Acceptable Evaluation Criteria Used in the November 2014 Request for Proposal for the Program Executive Office Soldier Systems Engineering and Technical Assistance (SETA) Contract

    Science.gov (United States)

    2017-09-01

    GS-0895-09 Industrial Engineering Technician 23.04 7.56 GS-0810-09 Civil Engineering Developmental (Programming) 23.04 7.56 GS-0810-11 Civil ... Engineering –Programming 27.88 9.14 GS-0810-12 Civil Engineering –Design 33.41 10.96 GS-2210-09 Info Tech Spec (Network Systems/Customer Support) 23.04...USED IN THE NOVEMBER 2014 REQUEST FOR PROPOSAL FOR THE PROGRAM EXECUTIVE OFFICE SOLDIER SYSTEMS ENGINEERING AND TECHNICAL ASSISTANCE (SETA) CONTRACT

  10. Technical resource documents and technical handbooks for hazardous-wastes management

    Energy Technology Data Exchange (ETDEWEB)

    Schomaker, N.B.; Bliss, T.M.

    1986-07-01

    The Environmental Protection Agency is preparing a series of Technical Resource Documents (TRD's) and Technical Handbooks to provide best engineering control technology to meet the needs of the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) respectively. These documents and handbooks are basically compilation of research efforts of the Land Pollution Control Division (LPCD) to date. The specific areas of research being conducted under the RCRA land disposal program relate to laboratory, pilot and field validation studies in cover systems, waste leaching and solidification, liner systems and disposal facility evaluation. The technical handbooks provide the EPA Program Offices and Regions, as well as the states and other interested parties, with the latest information relevant to remedial actions.

  11. Replacement strategy for ASDEX upgrade's new control and data acquisition

    International Nuclear Information System (INIS)

    Raupp, G.; Behler, K.; Cole, R.; Engelhardt, K.; Lohs, A.; Lueddecke, K.; Neu, G.; Treutterer, W.; Vijverberg, Th.; Zasche, D.; Zehetbauer, Th.

    2004-01-01

    ASDEX Upgrade is being equipped with a new real-time plasma control and data acquisition system and a novel time system. Major components were implemented and installed. While much work for performance optimisation and application programming remains to be done, commissioning of the new system parallel to experiment operation is being prepared. Commissioning of the new system will be done step-by-step. To facilitate testing the old and new control systems share all input signals. Switching between old and new system can be performed within 60 min: 23 fibre optics for output of actuator commands and input triggers must be connected to the active system and minor modifications done to interface the machine protection. Commissioning phases include background listening, technical discharges and full plasma operation. With the strategy chosen we minimize risk to the machine and reduce interference with ongoing experiment campaigns

  12. 78 FR 38304 - Applications for New Awards; Native Hawaiian Career and Technical Education Program (NHCTEP...

    Science.gov (United States)

    2013-06-26

    ... DEPARTMENT OF EDUCATION Applications for New Awards; Native Hawaiian Career and Technical Education Program (NHCTEP); Correction Catalog of Federal Domestic Assistance (CFDA), Number: 84.259A... Register and the Code of Federal Regulations is available via the Federal Digital System at: www.gpo.gov...

  13. Yucca Mountain Site Characterization Project: Technical Data Catalog (quarterly supplement), June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The DOE/NRC Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the date, place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994

  14. Current situation and discussion of acquisition work in professional libraries

    International Nuclear Information System (INIS)

    Lu Yan; Xin Pingping

    2010-01-01

    The acquisition work in professional libraries is an important part of library work, and faces enormous challenges at this stage. For the status quo of the acquisition work in professional libraries, we should develop effective acquisition principles to ensure the integrity of our professional library's collection and systematic literature, and to provide more effective protection for relevant research work. We need reasonable arrangements for the procurement of books with limited funding to avoid the waste of funds. We should use the network, to actively develop the procurement channels, and to establish accurate and reliable systematic network of information resources for the reader. We need to consciously cultivate and improve the professional competence of acquisition staff, to meet the requirement of the acquisition staff in the new situation. We should carry out knowledge management in professional library, to form a competitive 'knowledge resources'. For information research, technical personnel, and scientific researchers, we provide effective information services in time, and carry out personalized services. (authors)

  15. An Evaluation Instrument for Object-Oriented Example Programs for Novices

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak; Börstler, Jürgen; Nordström,, Marie

    objectively and consistently requires some kind of measurement instrument. In this paper, we describe the development and initial validation of an evaluation instrument for example programs, based on three aspects of quality; technical quality, object-oriented quality, and didactical quality. Validation......Examples are important tools for programming education. In this paper, we investigate desirable properties of programming examples from a cognitive and a measurement point of view. We argue that some cognitive aspects of example programs are "caught" by common software measures......, but they are not sufficient to capture all important aspects of understandability. We propose a framework for measuring the understandability of example programs that also considers factors related to the usage context of examples. Research shows that examples play an important role for cognitive skill acquisition. Students...

  16. Teaching Technical Writing and Editing -- In-House Programs That Work. Anthology Series No. 5.

    Science.gov (United States)

    Shaw, James G., Ed.

    The 12 articles in this publication provide indepth treatment of important aspects of in-house training programs for technical writing and editing. The articles deal with the following topics: the value of an in-house writing course, teaching in industry, developing an in-house writing course for engineers and scientists, a new approach to…

  17. Solar Energy Technologies Program: Multi-Year Technical Plan 2003-2007 and Beyond

    Energy Technology Data Exchange (ETDEWEB)

    2004-01-01

    This publication charts a 5-year planning cycle for the U.S. Department of Energy Solar Energy Technologies Program. The document includes anticipated technical plans for the next 5 years for photovoltaics, concentrating solar power, solar water and space heating, solar hybrid lighting, and other new concepts that can take advantage of the solar resource. Solar energy is described as a clean, abundant, renewable energy resource that can benefit the nation by diversifying our energy supply.

  18. 11. annual report of the technical advisory committee on the nuclear fuel waste management program

    International Nuclear Information System (INIS)

    1990-10-01

    The Eleventh Annual Report of the Technical Advisory Committee (TAC) assesses the scientific and technical progress made within the Canadian Nuclear Fuel Waste Management Program (NFWMP) during the period July 1989 to June 1990. The Committee notes that the general concept of a multibarrier system involving geologic media and engineered systems is based on known technologies and current scientific knowledge, and has gained strong international scientific and engineering support as currently the most feasible and practical. TAC continues to endorse the full investigation of the concept of nuclear waste disposal deep in plutonic formations, such as those in the Canadian Shield

  19. Real time data acquisition and processing system software supported by RDOS

    International Nuclear Information System (INIS)

    Yang Huimin; Chou Gongchun; Hao Shuxiang

    1982-01-01

    The paper describes a system software supported by RDOS operating system for management and supervision a multiuser nuclear spectrum data acquisition and processing system to be made of NOVA/840 computer. The system has manifold functions including four direct address data acquisition channels. One multi-dimension nuclear data acquisition channel, four scalers and four automatic control entrances. Every channel is used competitively by each user. The system's management and all processing functions are performed by system software. The architecture of the system can renew according to users' requirement with support of the system software.This article explains the logical structure of the system software and discusses some technical keys

  20. Proceedings of the 26. Arctic and Marine Oilspill Program (AMOP) Technical Seminar

    International Nuclear Information System (INIS)

    2003-01-01

    The papers presented at this Arctic and Marine Oilspill Program (AMOP) technical seminar reviewed the latest technologies that can be applied to the recovery and mitigation of marine oil spills. The very first seminar was held back in 1976 in response to public concerns regarding the potential for oil spills associated with offshore drilling in the Beaufort Sea in the Canadian Arctic. This twenty-sixth issue includes an appendix listing more than 1,200 AMOP papers from the first 25 years of the conference. Today, the AMOP conference has become international in nature and is the only surviving technical conference on oil spill science and technology in the world. While technical presentations about oil spills are the primary focus of the conference, many presentations also deal with other topics of interest, including contingency planning and legislation. In recent years, the conference has attracted about 200 people each year from 20 countries. The different sessions at this conference were entitled: (1) physical and chemical properties and behaviour of spilled oil, (2) activity updates and contingency planning, (3) detection, tracking and remote sensing, (4) biological effects of oil and hydrocarbons and oil biodegradation, (5) technical seminar on chemical spills with a special session on counter-terrorism, (6) technical seminar on chemical spills, (7) containment and recovery, (8) BIOSS, (9) in-situ burning and shoreline protection and cleanup, (10) oil spill treating agents, (11) spill modelling, and, (12) recent spill experiences. Several presentations described the process of oil in water interactions and were aimed at optimizing response functions, strategy development for marine oil spill response, equipment deployment, containment, recovery, and shoreline assessment. Several studies also presented new treatments for oil spills. Relevant papers and/or presentations were indexed separately for inclusion in the database

  1. Are 2 Years Enough? Exploring Technical Skills Acquisition Among General Surgery Residents in Brazil.

    Science.gov (United States)

    Santos, Elizabeth G; Salles, Gil F

    2016-01-01

    Phenomenon: Recent studies have shown that up to 40% of the General Surgery (GS) residents are not confident with their surgical skills. There is concern that residents are at risk of receiving inadequate training due to the low number of operations they perform. In Brazil, although all GS residents receive by law the Board Certification at the end of their programs, the assessment of their technical skills is not mandatory in Medical Residency programs' training. Consequently, our concern was that current GS medical residency format might be insufficient to create competent and autonomous general surgery residents after 2 years of regular training. Hence, the aim was to assess GS residents' surgical skills in their final months of training to evaluate the present format of GS residency programs in Brazil. Trained surgical faculty members directly observed 11 operations of varying difficulty performed by 2nd-year regular GS residents and by 4th-year residents in the optional Advanced Program in General Surgery. Participants were located at 3 university and 3 nonuniversity hospitals in Rio de Janeiro and Sao Paulo (Brazil's largest cities). Surgical skills were assessed using an internally developed observation checklist reviewed by subject matter experts. Sixty residents (46 regular 2nd-year trainees and 14 advanced 4th-year trainees) were assessed on performing 499 operations. Only 10 residents (17%), all advanced 4th-year residents, satisfactorily performed all operations and were considered eligible for the Board Certification. Even after excluding the 2 operations of greatest difficulty, only 24 regular 2nd-year residents (52%) satisfactorily performed the other 9 operations. Residents from hospitals with open Emergency Departments performed better than those from hospitals without Emergency Departments. Insights: The results of this pilot study suggest that residents with 2 years of training are not prepared for independent high-level surgical practice. The

  2. Evolution Of The Operational Energy Strategy And Its Consideration In The Defense Acquisition Process

    Science.gov (United States)

    2016-09-01

    Figure 12. PPBE Process Flowchart . Source: AcqNotes (2016). We comment above that once a program manager has completed his major Defense...acquisition system: 1) acquisition, 2) requirements and 3) planning, programming , budgeting, and execution (PPBE). We looked at the evolution of...to gain traction or improve promulgation of key guidance and documentation for new-starts and/or upgrades to weapon system acquisition programs

  3. Satellite power system concept development and evaluation program system definition technical assessment report

    Energy Technology Data Exchange (ETDEWEB)

    1980-12-01

    The results of the system definition studies conducted by NASA as a part of the Department of Energy/National Aeronautics and Space Administration SPS Concept Development and Evaluation Program are summarized. The purpose of the system definition efforts was to identify and define candidate SPS concepts and to evaluate the concepts in terms of technical and cost factors. Although the system definition efforts consisted primarily of evaluation and assessment of alternative technical approaches, a reference system was also defined to facilitate economic, environmental, and societal assessments by the Department of Energy. This reference system was designed to deliver 5 GW of electrical power to the utility grid. Topics covered include system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.

  4. Technical critique on radiation test facilities for the CTR surface and materials program

    International Nuclear Information System (INIS)

    Persiani, P.J.

    1975-02-01

    Major radiation test facilities will be necessary in the near-term (5 years) and long-term (greater than 10 years) future for the timely development and understanding of fusion confinement systems and of prototype fusion power reactors. The study includes the technical justifications and requirements for CTR Neutron and Plasma Radiation Test Facilities. The initial technical critique covers the feasibility and design problems: in upgrading the performance of the accelerator-rotating (solid TiT) target systems, and in transforming the accelerator-supersonic jet target concept into a radiation testing facility. A scoping assessment on the potential of a pulsed high-beta plasma device (dense plasma focus) is introduced to explore plasma concepts as near-term neutron and plasma radiation sources for the CTR Surface and Materials Program. (U.S.)

  5. Another Interface: Electronic Publishing and Technical Services.

    Science.gov (United States)

    Yamamoto, Rumi

    1986-01-01

    Discusses the problems of assimilating electronic publishing within the technical services area of academic libraries: whether to consider electronic journals as acquisitions; how to catalog them; whether to charge users for access to them; and how to preserve online publications for future research. Future trends in electronic publishing are…

  6. The Development of a Project-Based Collaborative Technical Writing Model Founded on Learner Feedback in a Tertiary Aeronautical Engineering Program

    Science.gov (United States)

    Tatzl, Dietmar; Hassler, Wolfgang; Messnarz, Bernd; Fluhr, Holger

    2012-01-01

    The present article describes and evaluates collaborative interdisciplinary group projects initiated by content lecturers and an English-as-a-Foreign-Language (EFL) instructor for the purpose of teaching technical writing skills in an aeronautical engineering degree program. The proposed technical writing model is assessed against the results of a…

  7. New FORTRAN computer programs to acquire and process isotopic mass spectrometric data: Operator's manual

    International Nuclear Information System (INIS)

    Smith, D.H.; McKown, H.S.

    1993-09-01

    This TM is one of a pair that describes ORNL-developed software for acquisition and processing of isotope ratio mass spectral data. This TM is directed at the laboratory analyst. No technical knowledge of the programs and programming is required. It describes how to create and edit files, how to acquire and process data, and how to set up files to obtain the desired results. The aim of this TM is to serve as a utilitarian instruction manual, a open-quotes how toclose quotes approach rather than a open-quotes why?close quotes

  8. Migrating Legacy Systems in the Global Merger & Acquisition Environment

    Science.gov (United States)

    Katerattanakul, Pairin; Kam, Hwee-Joo; Lee, James J.; Hong, Soongoo

    2009-01-01

    The MetaFrame system migration project at WorldPharma, while driven by merger and acquisition, had faced complexities caused by both technical challenges and organizational issues in the climate of uncertainties. However, WorldPharma still insisted on instigating this post-merger system migration project. This project served to (1) consolidate the…

  9. The Use of Workforce Assessment as a Component of Career and Technical Education Program Evaluation

    Science.gov (United States)

    Bartlett, Kenneth R.; Schleif, Nicole L.; Bowen, Mauvalyn M.

    2011-01-01

    This research project examined the extent to which Career and Technical Education (CTE)-related programs use workforce needs assessment as a component of their evaluation activities. An employer perspective was used to develop a conceptual framework drawing on strategic human resource management theory. The extent and methods utilized for…

  10. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    International Nuclear Information System (INIS)

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems' ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL's groundwater problems

  11. 76 FR 14954 - National Professional Development Program; Office of English Language Acquisition, Language...

    Science.gov (United States)

    2011-03-18

    ... Acquisition, Language Enhancement, and Academic Achievement for Limited English Proficient Students; Overview... to provide instruction that accelerates ELs' acquisition of language, literacy, and content knowledge.... Rosalinda Barrera, Assistant Deputy Secretary and Director for English Language Acquisition, Language...

  12. Communication of technical information to lay audiences

    International Nuclear Information System (INIS)

    Bowes, J.E.; Stamm, K.R.; Jackson, K.M.; Moore, J.

    1978-05-01

    One of the objectives of the National Waste Terminal Storage (NWTS) Program is to provide terminal storage facilities for commercial radioactive wastes in various geologic formations at multiple locations in the United States. The activities performed under the NWTS Program will affect regional, state, and local areas, and widespread public interest in this program is expected. Since a large part of the NWTS Program deals with technical information it was considered desirable to initiate a study dealing with possible methods of effectively transmitting this technical information to the general public. This study has the objective of preparing a state-of-the-art report on the communication of technical information to lay audiences. The particular task of communicating information about the NWTS Program to the public is discussed where appropriate. The results of this study will aid the NWTS Program in presenting to the public the quite diverse technical information generated within the program so that a widespread, thorough public understanding of the NWTS Program might be achieved. An annotated bibliography is included

  13. Spent fuel test - Climax: technical measurements. Interim report, fiscal year 1981

    International Nuclear Information System (INIS)

    Patrick, W.C.; Ballou, L.B.; Butkovich, T.R.

    1982-01-01

    The Spent Fuel Test-Climax (SFT-C) is located 420 m below surface in the Climax granite stock on the Nevada Test Site. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized from April to May 1980, initiating the 3- to 5-year-duration test. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. Technical objectives of the test led to development of a technical measurements program, which is the subject of this report. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the first 1-1/2 years of the test on more than 900 channels. Much of the acquired data are now available for analysis and are presented here. Highlights of activities this year include completion of site characterization field work, major modifications to the data acquisition and the management systems, and the addition of instrument evaluation as an explicit objective of the test

  14. Spent fuel test - Climax: technical measurements. Interim report, fiscal year 1981

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, W.C.; Ballou, L.B.; Butkovich, T.R.

    1982-04-30

    The Spent Fuel Test-Climax (SFT-C) is located 420 m below surface in the Climax granite stock on the Nevada Test Site. Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized from April to May 1980, initiating the 3- to 5-year-duration test. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. Technical objectives of the test led to development of a technical measurements program, which is the subject of this report. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the first 1-1/2 years of the test on more than 900 channels. Much of the acquired data are now available for analysis and are presented here. Highlights of activities this year include completion of site characterization field work, major modifications to the data acquisition and the management systems, and the addition of instrument evaluation as an explicit objective of the test.

  15. Design of gamma camera data acquisition system based on PCI9810

    International Nuclear Information System (INIS)

    Zhao Yuanyuan; Zhao Shujun; Liu Yang

    2004-01-01

    This paper describe the design of gamma camera's data acquisition system, which is based on PCI9810 data acquisition card of ADLink Technology Inc. The main function of PCI9810 and the program of data acquisition system are described. (authors)

  16. 48 CFR 252.227-7026 - Deferred delivery of technical data or computer software.

    Science.gov (United States)

    2010-10-01

    ... technical data or computer software. 252.227-7026 Section 252.227-7026 Federal Acquisition Regulations... data or computer software. As prescribed at 227.7103-8(a), use the following clause: Deferred Delivery of Technical Data or Computer Software (APR 1988) The Government shall have the right to require, at...

  17. IDA and the Technical Cooperation Program Real-Time Systems and Ada Workshop, 21-23 June 1988

    Science.gov (United States)

    1988-06-01

    IDA Memorandum Report M-540, IDA and the Technical Cooperation Program Real - Time Systems and Ada Workshop, 21-23 June 1988, documents the results of... time systems , (2) identify and clarify known Ada real-time issues, (3) identify near-term and long-term solutions, and (4) provide assessment and...Technology (ODUSD R&AT). Funding was provided by the STARS Joint Program Office. The objectives were to (1) define requirements for using Ada in real

  18. Effectiveness of a Heritage Educational Program for the Acquisition of Oral and Written French and Tahitian in French Polynesia

    Science.gov (United States)

    Nocus, Isabelle; Guimard, Philippe; Vernaudon, Jacques; Paia, Mirose; Cosnefroy, Olivier; Florin, Agnes

    2012-01-01

    The research examines the effects of a bilingual pedagogical program (French/Tahitian) on the acquisition of oral and written French as well as the Tahitian language itself in primary schools in French Polynesia. 125 children divided into an experimental group (partially schooled in Tahitian for 300 min per week) and a control group (schooled in…

  19. Bell Laboratories Book Acquisition, Accounting and Cataloging System (BELLTIP).

    Science.gov (United States)

    Sipfle, William K.

    BELLTIP is an on-line library processing system concerned with book acquisitions, cataloging, and financial accounting for a newwork of 26 technical libraries. At its center is an interactively updated and queried set of files concerned with all items currently in process. Principal products include all purchase orders, claims, and cancellations;…

  20. Technical assistance to Department of Energy/Office of Operational Safety Assurance Program for remedial action

    International Nuclear Information System (INIS)

    Denham, D.H.; Cross, F.T.; Kennedy, W.E. Jr.; Marks, S.; Soldat, J.K.; Stenner, R.D.

    1986-01-01

    This project was initiated in FY 1984 to provide technical assistance to the Department of Energy (DOE), Office of Operational Safety (OOS) in developing and implementing its Assurance Program for Remedial Action (APRA), i.e., overview of the DOE remedial action programs. During this second year of the project,* the technical assistance included report and procedure reviews, and assistance with conducting the Uranium Mill Tailings Remedial Action Program (UMTRAP) Office (DOE/AL) appraisal. This included participation in preappraisal visits to UMTRAP sites in Canonsburg, Pennsylvania; Grand Junction, Colorado; and Salt Lake City, Utah. Pacific Northwest Laboratory (PNL) also transferred the PNL-developed document review software to the Oak Ridge Associated Universities (ORAU) staff in Grand Junction, Colorado, in anticipation of future document reviews by the ORAU staff. Other accomplishments have included publication of two formal documents and three project reports, preparation and presentation of five topical reports at national and international meetings, two foreign trip reports, and comments on proposed draft standards of the Environmental Protection Agency (40 CFR 193). The project manager has also participated on National Council on Radiation Protection and Measurements (NCRP) and American Society for Testing and Materials (ASTM) subcommittees developing decommissioning standards, as well as International Atomic Energy Agency (IAEA) advisory groups developing environmental monitoring guidelines

  1. 76 FR 32841 - Defense Federal Acquisition Regulation Supplement; Foreign Acquisition Amendments (DFARS Case...

    Science.gov (United States)

    2011-06-06

    ..., eligibility of Peruvian end products under trade agreements, and participation of foreign contractors in... contractors in acquisitions in support of operations in Afghanistan, and eligibility of Peruvian end products....225-7045, Balance of Payments Program--Construction Material Under Trade Agreements. This final rule...

  2. Task plan for the US Department of Energy TMI-2 programs

    International Nuclear Information System (INIS)

    1982-10-01

    The Task Plan for the US Department of Energy (DOE) Three Mile Island (TMI) Unit 2 Programs identifies the tasks to be planned and administered by the DOE Technical Integration Office (TIO) in a manner which will maximize the use of available resources, obtain the maximum benefit from the opportunities associated with the TMI-2 cleanup effort, and retrieve generically useful information for addressing some of the key problems and issues facing the nuclear power industry. The Plan identifies tasks in three major program areas where DOE has assumed implementation responsibility. The DOE TMI-2 Programs are: Data Acquisition Program, Waste Immobilization Program, and Reactor Evaluation Program. The plan is intended to serve as a management overview by defining the task objective, benefits, and work scope with respect to prioritization of tasks and utilization of resources

  3. Alcohol Fuels Program technical review, Spring 1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The alcohol fuels program consists of in-house and subcontracted research for the conversion of lignocellulosic biomass into fuel alcohols via thermoconversion and bioconversion technologies. In the thermoconversion area, the SERI gasifier has been operated on a one-ton per day scale and produces a clean, medium-Btu gas that can be used to manufacture methanol with a relatively small gas-water shift reaction requirement. Recent research has produced catalysts that make methanol and a mixture of higher alcohols from the biomass-derived synthetic gas. Three hydrolysis processes have emerged as candidates for more focused research. They are: a high-temperature, dilute-acid, plug-flow approach based on the Dartmouth reactor; steam explosion pretreatment followed by hydrolysis using the RUT-C30 fungal organism; and direct microbial conversion of the cellulose to ethanol using bacteria in a single or mixed culture. Modeling studies, including parametric and sensitivity analyses, have recently been completed. The results of these studies will lead to a better definition of the present state-of-the-art for these processes and provide a framework for establishing the research and process engineering issues that still need resolution. In addition to these modeling studies, economic feasibility studies are being carried out by commercial engineering firms. Their results will supplement and add commercial validity to the program results. The feasibility contractors will provide input at two levels: Technical and economic assessment of the current state-of-the-art in alcohol production from lignocellulosic biomass via thermoconversion to produce methanol and higher alcohol mixtures and bioconversion to produce ethanol; and identification of research areas having the potential to significantly reduce the cost of production of alcohols.

  4. Technical changes that would contribute to success in the civilian radioactive waste management program

    International Nuclear Information System (INIS)

    Ramspott, L.D.

    1993-01-01

    Many changes have taken place since the SCP safety strategy was formulated; it needs to be revised or replaced. Four concepts would aid in the shift from a rigid, ecelctic, schedule-driven, all-or-nothing program to an incremental, evolving, and experimental but integrated program. These are a simple safety case, reversability, demonstrability, and decoupling operations of a repository from operation of reactors. A simple safety case based on containment can be made for a repository at Yucca Mountain. This containment strategy is based on the dryness of openings at Yucca Mountain, Extended Dry heat management, and long-lived containers. Reversibility is technically believable at Yucca Mountain because of extended retrievability and drift emplacement, if an MRS were co-located with the repository. Because the rock is unsaturated, extended retrievability is technically feasible at Yucca Mountain. Demonstrability could be improved at Yucca Mountain by planning for incremental progression toward operation and closure of a repository, possibly including a shift to underground retrievable storage. Demonstrability can also be improved by using natural analogs. Repository operation can be decoupled from reactor operation by use of an unconstrained MRS facility or at-reactor dry storage and multipurpose storage canister/casks

  5. Development and implementation of a technical and didactical training program for student tutors in the dissection course.

    Science.gov (United States)

    Shiozawa, Thomas; Hirt, Bernhard; Celebi, Nora; Baur, Friederike; Weyrich, Peter; Lammerding-Köppel, Maria

    2010-12-20

    student tutors have a long tradition in gross anatomy instruction. However, the full potential of the tutors is generally not tapped, since little attention is paid to their technical and didactical training. The aim of this paper is to report a systematic approach to the development, didactic reasoning and implementation of a curriculum for training student tutors in gross anatomy. the training program was developed using the six-step approach of Kern's curriculum development model. For needs assessment, the literature research was amended by a survey among the 1st and 2nd year students of the dissection course (n=167) and two independent 90 min focus group interviews with the tutors who supervised these students (n=15). Protocols were transcribed and analyzed by margin coding. The training curriculum was setup on the basis of these data. corresponding to the literature, the students want student tutors with good teaching competence as well as adequate content knowledge and technical competence. Supporting that, the tutors request a training program enhancing their didactic skills as well as their knowledge of content and working using relevant methods. Thus, a combined didactic and professional training program has been developed. Six professional and 11 didactic learning objectives were defined. A 3 weeks training curriculum was implemented, using microteaching and group exercises for didactics and active dissection for technical training. Both parts were interlocked on a contextual and practical level. our focus group analyses revealed that a specific training program for student tutors in the dissection course is necessary. We describe a feasible task-oriented training curriculum combining didactic and professional objectives. 2010. Published by Elsevier GmbH.

  6. An integrated acquisition, display, and analysis system

    International Nuclear Information System (INIS)

    Ahmad, T.; Huckins, R.J.

    1987-01-01

    The design goal of the ND9900/Genuie was to integrate a high performance data acquisition and display subsystem with a state-of-the-art 32-bit supermicrocomputer. This was achieved by integrating a Digital Equipment Corporation MicroVAX II CPU board with acquisition and display controllers via the Q-bus. The result is a tightly coupled processing and analysis system for Pulse Height Analysis and other applications. The system architecture supports distributed processing, so that acquisition and display functions are semi-autonomous, making the VAX concurrently available for applications programs

  7. Technical planning activity: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  8. Technical planning activity: Final report

    International Nuclear Information System (INIS)

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements

  9. Technical and Political Assessment of Peaceful Nuclear Power Program Prospects in North Africa and the Middle East

    Energy Technology Data Exchange (ETDEWEB)

    Windsor, Lindsay K.; Kessler, Carol E.

    2007-09-11

    An exceptional number of Middle Eastern and North African nations have recently expressed interest in developing nuclear energy for peaceful purposes. Many of these countries have explored nuclear research in limited ways in the past, but the current focused interest and application of resources towards developing nuclear-generated electricity and nuclear-powered desalination plants is unprecedented. Consequently, questions arise in response to this emerging trend: What instigated this interest? To what end(s) will a nuclear program be applied? Does the country have adequate technical, political, legislative, nonproliferation, and safety infrastructure required for the capability desired? If so, what are the next steps for a country in preparation for a future nuclear program? And if not, what collaboration efforts are possible with the United States or others? This report provides information on the capabilities and interests of 13 countries in the region in nuclear energy programs in light of safety, nonproliferation and security concerns. It also provides information useful for determining potential for offering technical collaboration, financial aid, and/or political support.

  10. ANL Technical Support Program for DOE Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J.; Bourcier, W.L.; Morgan, L.E.; Nielsen, J.K.; Steward, S.A.; Ewing, R.C.; Wang, L.M.; Han, W.T.; Tomozawa, M.

    1992-03-01

    This report provides an overview of progress during FY 1991 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE, Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defenses Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are likely to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: (1) to review and evaluate available information on parameters that will be important in establishing the long-term performance of glass in a repository environment; (2) to perform testing to further quantify the effects of important variables where there are deficiencies in the available data; and (3) to initiate long-term testing that will bound glass performance under a range of conditions applicable to repository disposal

  11. Complexity in an Unexpected Place: Quantities in Selected Acquisition Reports

    Science.gov (United States)

    2017-12-01

    by the Army Acquisition Executive contains the following language . As a recently delegated Acquisition Category IC program, the AH-64E Apache...Complexity in an Unexpected Place: Quantities in Selected Acquisition Reports Gregory A. Davis, Project Leader Margaret L. Giles David M. Tate I...F E N S E A N A L Y S E S IDA Paper P-8490 Complexity in an Unexpected Place: Quantities in Selected Acquisition Reports Gregory A. Davis

  12. College Graduation Rates for Minority Students in a Selective Technical University: Will Participation in a Summer Bridge Program Contribute to Success?

    Science.gov (United States)

    Murphy, Terrence E; Gaughan, Monica; Hume, Robert; Moore, S Gordon

    2010-03-01

    There are many approaches to solving the problem of underrepresentation of some racial and ethnic groups and women in scientific and technical disciplines. Here, the authors evaluate the association of a summer bridge program with the graduation rate of underrepresented minority (URM) students at a selective technical university. They demonstrate that this 5-week program prior to the fall of the 1st year contains elements reported as vital for successful student retention. Using multivariable survival analysis, they show that for URM students entering as fall-semester freshmen, relative to their nonparticipating peers, participation in this accelerated summer bridge program is associated with higher likelihood of graduation. The longitudinal panel data include more than 2,200 URM students.

  13. NNSA?s Computing Strategy, Acquisition Plan, and Basis for Computing Time Allocation

    Energy Technology Data Exchange (ETDEWEB)

    Nikkel, D J

    2009-07-21

    This report is in response to the Omnibus Appropriations Act, 2009 (H.R. 1105; Public Law 111-8) in its funding of the National Nuclear Security Administration's (NNSA) Advanced Simulation and Computing (ASC) Program. This bill called for a report on ASC's plans for computing and platform acquisition strategy in support of stockpile stewardship. Computer simulation is essential to the stewardship of the nation's nuclear stockpile. Annual certification of the country's stockpile systems, Significant Finding Investigations (SFIs), and execution of Life Extension Programs (LEPs) are dependent on simulations employing the advanced ASC tools developed over the past decade plus; indeed, without these tools, certification would not be possible without a return to nuclear testing. ASC is an integrated program involving investments in computer hardware (platforms and computing centers), software environments, integrated design codes and physical models for these codes, and validation methodologies. The significant progress ASC has made in the past derives from its focus on mission and from its strategy of balancing support across the key investment areas necessary for success. All these investment areas must be sustained for ASC to adequately support current stockpile stewardship mission needs and to meet ever more difficult challenges as the weapons continue to age or undergo refurbishment. The appropriations bill called for this report to address three specific issues, which are responded to briefly here but are expanded upon in the subsequent document: (1) Identify how computing capability at each of the labs will specifically contribute to stockpile stewardship goals, and on what basis computing time will be allocated to achieve the goal of a balanced program among the labs. (2) Explain the NNSA's acquisition strategy for capacity and capability of machines at each of the labs and how it will fit within the existing budget constraints. (3

  14. Problems of technical cooperation

    International Nuclear Information System (INIS)

    Noramli, M.

    1987-01-01

    The main principles of the IAEA technical co-operation program, which intends to answer the requirements of the member states as regards technical assistance, are presented. IAEA offers its assistance in the supervision and financial support of the projects, which promise direct and quick profit to the member states. Projects related to the satisfaction of the main demands of humanity, industrial use, energy generation, radiation protection and other fields, which can promote the contribution of nuclear power generation to the course of peace, protection of health and thriving of states, are among them. 35 million dollars (USA) was allocated for the IAEA technical assistance and realization of the co-operation program in 1987

  15. A Cognitive Neuroscience Perspective on Skill Acquisition in Catheter-based Interventions

    NARCIS (Netherlands)

    Paul, Katja; Cnossen, Fokeltje; Lanzer, Peter

    2018-01-01

    Catheter-based cardiovascular interventions (CBCVI) provide a fascinating context to study skill acquisition. In CBCVI, multiple cognitive skills are crucial; technical, perceptual, and decision-making skills are all used at the same time and often depend on each other. In order to be able to

  16. 48 CFR 212.7002 - Pilot program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...

  17. Effects of two different short-term training programs on the physical and technical abilities of adolescent basketball players.

    Science.gov (United States)

    Bogdanis, Gregory C; Ziagos, Vaghelis; Anastasiadis, Michalis; Maridaki, Maria

    2007-04-01

    This study evaluated and compared the effectiveness of two different off-season, short-term basketball training programs on physical and technical abilities of young basketball players. Twenty-seven adolescent basketball players (14.7+/-0.5 years; Tanner stage: 3.5+/-0.5) were randomly divided into a specialized basketball training group (SP, n=10), a mixed basketball plus conditioning training group (MX, n=10) and a control group (n=7). Training included five sessions per week (100-120 min each) and was performed for 4 weeks. Maximal oxygen uptake was similarly improved after SP (4.9+/-1.8%) and MX (4.9+/-1.4%), but there was no effect on ventilatory threshold. Peak and mean power output measured during the Wingate test were also improved by a similar magnitude after SP (21+/-5%) and MX (15+/-6%). Trunk muscle endurance was equally increased (SP: 23+/-4%, MX: 25+/-5%), but arms endurance was improved significantly more after MX (50+/-11%) compared to SP (11+/-14%, pbasketball technical skills was similarly increased (by 17-27%) in both groups, with a tendency for greater improvement of the SP groups in the technical skills of shooting and passing. These results indicate that a SP basketball training program, performed exclusively on-court was as effective as a MX training program in terms of aerobic and anaerobic fitness improvement. Furthermore, the decrease of the total on-court training time in the MX group resulted in a tendency for a smaller improvement of basketball technical skills. In conclusion, both SP and MX training are equally effective in order to limit and/or reverse the detraining effects that occur during the off-season in basketball.

  18. Program plan for shipment, receipt, and storage of the TMI-2 core. Revision 1

    International Nuclear Information System (INIS)

    Quinn, G.J.; Reno, H.W.; Schmitt, R.C.

    1985-01-01

    This plan addresses the preparation and shipment of core debris from Three Mile Island Unit 2 (TMI-2) to the Idaho National Engineering Laboratory (INEL) and receipt and storage of that core debris. The Manager of the Nuclear Materials Evaluation Programs Division of EG and G Idaho, Inc. will manage two separate but integrated programs, one located at TMI (Part 1) and the other at INEL (Part 2). The Technical Integration Office (at TMI) is responsible for developing and implementing Part 1, TMI-2 Core Shipment Program. The Technical Support Branch (at INEL) is responsible for developing and implementing Part 2, TMI-2 Core Receipt and Storage. The plan described herein is a revision of a previous document entitled Plan for Shipment, Storage, and Examination of TMI-2 Fuel. This revision was required to delineate changes, primarily in Part 2, Core Activities Program, of the previous document. That part of the earlier document related to core examination was reidentified in mid-FY-1984 as a separate trackable entity entitled Core Sample Acquisition and Examination Project, which is not included here

  19. Instrumentation and electrical program at the Three Mile Island Unit 2, Technical Integration Office

    International Nuclear Information System (INIS)

    Hecker, L.A.

    1982-01-01

    The Three Mile Island Unit 2 accident of March 28, 1979 presents unique research opportunities that can provide valuable information on nuclear power plant safety philosophy and safety systems performance. The Technical Integration Office at Three Mile Island was established by the Department of Energy to manage a broad-based research and development program. One significant part of this effort is the Instrumentation and Electrical Program, which operates: (1) to identify instruments and electrical components that failed during or since the accident; (2) to test and analyze them in order to identify the causes of failure; and (3) to assess the survivability of those that did not fail. The basis for selection of equipment is discussed, and the testing methodology is described. Also, some results of Instrumentation and Electrical Program work to date are presented

  20. Minicomputer data acquisition system for nuclear physics applications

    Energy Technology Data Exchange (ETDEWEB)

    Kouzes, R [Princeton Univ., NJ (USA). Joseph Henry Labs.

    1978-09-15

    The data acquisition system for the Princeton Cyclotron facility based on a Data General Eclipse computer is described. The program ACQUIRE is a highly flexible acquisition code able to support diverse experimental requirements and yet capable of sorting a repetitious pulser in a single ADC at up to 40 kHz without loss.

  1. Assessing Students' Technical Skill Attainment

    Science.gov (United States)

    Jorgensen, Haley

    2010-01-01

    The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…

  2. An integrated, multi-vendor distributed data acquisition system

    International Nuclear Information System (INIS)

    Butner, D.N.; Drlik, M.; Meyer, W.H.; Moller, J.M.; Preckshot, G.G.

    1988-01-01

    A distributed data acquisition system that uses various computer hardware and software is being developed to support magnetic fusion experiments at Lawrence Livermore National Laboratory (LLNL). The experimental sequence of operations is controlled by a supervisory program, which coordinates software running on Digital Equipment Corporation (DEC) VAX computers, Hewlett-Packard (HP) UNIX-based workstations, and HP BASIC desktop computers. An interprocess communication system (IPCS) allows programs to communicate with one another in a standard manner regardless of program location in the network or of operating system and hardware differences. We discuss the design and implementation of this data acquisition system with particular emphasis on the coordination model and the IPCS. 5 refs., 3 figs

  3. Technical Advisory Committee on the nuclear fuel waste management program : thirteenth annual report

    International Nuclear Information System (INIS)

    Shemilt, L.W.

    1993-03-01

    Since the last reporting period by the Technical Advisory Committee (TAC) the emphasis of the work in the Canadian Nuclear Fuel Waste Management Program (CNFWMP) has been on the writing of the Environmental Impact Statement (EIS) and the associated set of nine primary reference documents as well as supporting documents. These are in preparation for submission to the Environmental Assessment Review Panel who will lead the national evaluation of the disposal concept under the auspices of the Federal Environmental Assessment Review Office (FEARO). The disposal concept developed over the last fourteen years by Atomic Energy of Canada Limited (AECL) and anticipated to be presented by means of the EIS in 1994, is based on a multiple system of natural and man-made barriers wherein nuclear waste is first enclosed in corrosion-resistant containers, designed to last at least 500 years, and then placed in a vault excavated 500 - 1000 m deep in granitic rocks of the Canadian Shield. After container emplacement either in or on the floor of the vault, and with a surrounding buffer material of a bentonite clay/sand mixture, the vault will be backfilled and sealed with crushed rock, buffer and sand, as will be the shafts and exploratory boreholes. The case study being presented by AECL to demonstrate the safety of this concept and the technology to implement it, relies on computer simulations of a hypothetical disposal site with geological characteristics similar to those at the Underground Research Laboratory (URL) in the Whiteshell Research Area (WRA) located in Manitoba. The preliminary simulation results suggest that safe containment can be achieved provided that the waste is surrounded by a sparsely-fractured zone of rock wherein movement of contaminants carried by groundwater is modelled as a diffusive as opposed to a advective process. The principal focus of work during the past year within the environmental and safety assessment has been to complete the Post

  4. Efficient separations and processing crosscutting program 1996 technical exchange meeting. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    This document contains summaries of technology development presented at the 1996 Efficient Separations and Processing Crosscutting Program Technical Exchange Meeting. This meeting is held annually to promote a free exchange of ideas among technology developers, potential users and other interested parties within the EM community. During this meeting the following many separation processes technologies were discussed such as ion exchange, membrane separation, vacuum distillation, selective sorption, and solvent extraction. Other topics discussed include: waste forms; testing or inorganic sorbents for radionuclide and heavy metal removal; selective crystallization; and electrochemical treatment of liquid wastes. This is the leading abstract, individual papers have been indexed separately for the databases.

  5. Efficient separations and processing crosscutting program 1996 technical exchange meeting. Proceedings

    International Nuclear Information System (INIS)

    1996-01-01

    This document contains summaries of technology development presented at the 1996 Efficient Separations and Processing Crosscutting Program Technical Exchange Meeting. This meeting is held annually to promote a free exchange of ideas among technology developers, potential users and other interested parties within the EM community. During this meeting the following many separation processes technologies were discussed such as ion exchange, membrane separation, vacuum distillation, selective sorption, and solvent extraction. Other topics discussed include: waste forms; testing or inorganic sorbents for radionuclide and heavy metal removal; selective crystallization; and electrochemical treatment of liquid wastes. This is the leading abstract, individual papers have been indexed separately for the databases

  6. Isotope Brayton ground demonstration testing and flight qualification. Volume 1. Technical program

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-09

    A program is proposed for the ground demonstration, development, and flight qualification of a radioisotope nuclear heated dynamic power system for use on space missions beginning in the 1980's. This type of electrical power system is based upon and combines two aerospace technologies currently under intense development; namely, the MHW isotope heat source and the closed Brayton cycle gas turbine. This power system represents the next generation of reliable, efficient economic electrical power equipment for space, and will be capable of providing 0.5 to 2.0 kW of electric power to a wide variety of spacecraft for earth orbital and interplanetary missions. The immediate design will be based upon the requirements for the Air Force SURVSATCOM mission. The proposal is presented in three volumes plus an Executive Summary. This volume describes the tasks in the technical program.

  7. The INR program in 2000-2005 period for developing the national technical support of the nuclear power

    International Nuclear Information System (INIS)

    Gheorghiu, C.

    2001-01-01

    The INR - Pitesti is largely implied in implementing the tasks of high complexity stipulated by the Emergency Directive of the Romanian Government No. 144/30.09.1999 meant to ensure the national technical support for the nuclear power field as well as the development of presupposed international cooperation. The Strategic Program of the Autonomous Authority for Nuclear Activities (RAAN) stipulates the main activities to be carried-out in the period 2000-2005 and beyond, in the frame of 18 specific programs. These programs approaches high priority world wide issues targeting major objectives like efficient operation of NPPs ensuring the design service life, creating conditions for extension of operation duration increasing the safety standard of personnel, of population as well as reducing the impact of nuclear power upon the environmental. Also, the program approaches functionally the problem of safety management of the radioactive waste resulting from nuclear facility operation. Achieving these major objective as well as of those specific laid down in the Strategic Program requires continual supply with material and human resources, refurbishment of material background of INR in its research and development activities as well as a consistent integration of the INR staff of researchers within the international scientific community. Implementing the annual programs included in the Strategic Program will ensure also fulfilment of the international arrangements of our country as well as the realization of the agreements concluded by the Ministry of Industry and Resources and RAAN with analogous authorities from abroad (AECL - Canada, DOE - USA, etc.). This document has the following content: 1. Legislative support and the mission of the program; 2. Program's strategic objectives; 3. General technical objectives of the programs. 4. Financing; 5. Providing and training human resources; 6. Investments for research and development; 7. International cooperation; 8

  8. Conversion of research and test reactors to low enriched uranium fuel: technical overview and program status

    International Nuclear Information System (INIS)

    Roglans-Ribas, J.

    2008-01-01

    Many of the nuclear research and test reactors worldwide operate with high enriched uranium fuel. In response to worries over the potential use of HEU from research reactors in nuclear weapons, the U.S Department of Energy (DOE) initiated a program - the Reduced Enrichment for Research and Test Reactors (RERTR) - in 1978 to develop the technology necessary to reduce the use of HEU fuel by converting research reactors to low enriched uranium (LEU) fuel. The Reactor Conversion program is currently under the DOE's National Nuclear Security Administration's Global Threat Reduction Initiative (GTRI). 55 of the 129 reactors included in the scope have been already converted to LEU fuel or have shutdown prior to conversion. The major technical activities of the Conversion Program include: (1) the development of advanced LEU fuels; (2) conversion analysis and conversion support; and (3) technology development for the production of Molybdenum-99 (Mo 99 ) with LEU targets. The paper provides an overview of the status of the program, the technical challenges and accomplishments, and the role of international collaborations in the accomplishment of the Conversion Program objectives. Nuclear research and test reactors worldwide have been in operation for over 60 years. Many of these facilities operate with high enriched uranium fuel. In response to increased worries over the potential use of HEU from research reactors in the manufacturing of nuclear weapons, the U.S Department of Energy (DOE) initiated a program - the Reduced Enrichment for Research and Test Reactors (RERTR) - in 1978 to develop the technology necessary to reduce the use of HEU fuel in research reactors by converting them to low enriched uranium (LEU) fuel. The reactor conversion program was initially focused on U.S.-supplied reactors, but in the early 1990s it expanded and began to collaborate with Russian institutes with the objective of converting Russian supplied reactors to the use of LEU fuel.

  9. Army Acquisition and Contracting Personnel Requirements: How are the Army’s Current Recruitment, Development and Retention Programs Meeting Current and Future Personnel Requirements?

    Science.gov (United States)

    2011-09-01

    shaping the makeup of the workforce, but rather focused more on controlling the number of personnel. To improve the acquisition process, DoD implemented...including internal controls ), personnel, organizations, training, policy and regulations, as well as looked into legislative solutions, to establish...programs, telecommuting policy, physical wellness programs, mobility and cross-functional developmental opportunities, availability of mentoring, coaching

  10. Value-informed space systems design and acquisition

    Science.gov (United States)

    Brathwaite, Joy

    Investments in space systems are substantial, indivisible, and irreversible, characteristics that make them high-risk, especially when coupled with an uncertain demand environment. Traditional approaches to system design and acquisition, derived from a performance- or cost-centric mindset, incorporate little information about the spacecraft in relation to its environment and its value to its stakeholders. These traditional approaches, while appropriate in stable environments, are ill-suited for the current, distinctly uncertain, and rapidly changing technical and economic conditions; as such, they have to be revisited and adapted to the present context. This thesis proposes that in uncertain environments, decision-making with respect to space system design and acquisition should be value-based, or at a minimum value-informed. This research advances the value-centric paradigm by providing the theoretical basis, foundational frameworks, and supporting analytical tools for value assessment of priced and unpriced space systems. For priced systems, stochastic models of the market environment and financial models of stakeholder preferences are developed and integrated with a spacecraft-sizing tool to assess the system's net present value. The analytical framework is applied to a case study of a communications satellite, with market, financial, and technical data obtained from the satellite operator, Intelsat. The case study investigates the implications of the value-centric versus the cost-centric design and acquisition choices. Results identify the ways in which value-optimal spacecraft design choices are contingent on both technical and market conditions, and that larger spacecraft for example, which reap economies of scale benefits, as reflected by their decreasing cost-per-transponder, are not always the best (most valuable) choices. Market conditions and technical constraints for which convergence occurs between design choices under a cost-centric and a value

  11. Internal dosimetry technical basis manual

    International Nuclear Information System (INIS)

    1990-01-01

    The internal dosimetry program at the Savannah River Site (SRS) consists of radiation protection programs and activities used to detect and evaluate intakes of radioactive material by radiation workers. Examples of such programs are: air monitoring; surface contamination monitoring; personal contamination surveys; radiobioassay; and dose assessment. The objectives of the internal dosimetry program are to demonstrate that the workplace is under control and that workers are not being exposed to radioactive material, and to detect and assess inadvertent intakes in the workplace. The Savannah River Site Internal Dosimetry Technical Basis Manual (TBM) is intended to provide a technical and philosophical discussion of the radiobioassay and dose assessment aspects of the internal dosimetry program. Detailed information on air, surface, and personal contamination surveillance programs is not given in this manual except for how these programs interface with routine and special bioassay programs

  12. Internal dosimetry technical basis manual

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-20

    The internal dosimetry program at the Savannah River Site (SRS) consists of radiation protection programs and activities used to detect and evaluate intakes of radioactive material by radiation workers. Examples of such programs are: air monitoring; surface contamination monitoring; personal contamination surveys; radiobioassay; and dose assessment. The objectives of the internal dosimetry program are to demonstrate that the workplace is under control and that workers are not being exposed to radioactive material, and to detect and assess inadvertent intakes in the workplace. The Savannah River Site Internal Dosimetry Technical Basis Manual (TBM) is intended to provide a technical and philosophical discussion of the radiobioassay and dose assessment aspects of the internal dosimetry program. Detailed information on air, surface, and personal contamination surveillance programs is not given in this manual except for how these programs interface with routine and special bioassay programs.

  13. Informational Reinforcement of Students’ Course Design Aimed at Promoting Engineers Training Quality in Technical Education

    Directory of Open Access Journals (Sweden)

    B. N. Guzanov

    2012-01-01

    Full Text Available Using the modern information technologies in educational process is regarded as one of the main directions in training the qualified specialists with systematic engineering thinking. The optimum combination of various educational technologies and computerized resources can improve teaching quality and promote students’ professional level. Taking as an example one of the basic technical disciplines of the engineering training curriculum at a technical higher school, the authors describe the computerized technology facilitating the course design. The technology in question - the «Reduktor» courseware - adapts the complex product of Autodesk –AutoCAD for educational purposes. The above program is the enhanced interface of AutoCAD, linked to the Microsoft Excel spreadsheet and the reference data library used for designing the reduction gear. The experimental research, based on the qualimetric approach and continuous diagnostic and prognostic monitoring of the key indices of knowledge acquisition, proves the effectiveness of informational reinforcement of students self-dependent work. 

  14. Material Not Categorized As Waste (MNCAW) data report. Radioactive Waste Technical Support Program

    Energy Technology Data Exchange (ETDEWEB)

    Casey, C.; Heath, B.A.

    1992-11-01

    The Department of Energy (DOE), Headquarters, requested all DOE sites storing valuable materials to complete a questionnaire about each material that, if discarded, could be liable to regulation. The Radioactive Waste Technical Support Program entered completed questionnaires into a database and analyzed them for quantities and type of materials stored. This report discusses the data that TSP gathered. The report also discusses problems revealed by the questionnaires and future uses of the data. Appendices contain selected data about material reported.

  15. Getting Defense Acquisition Right

    Science.gov (United States)

    2017-01-01

    on top of events and steer them to get where we need to go as efficiently as possible. Program management is not a spectator sport . Frank Frank...I made in the e-mail above and discusses some of the proactive steps a Program Manager can take, ahead of time , to reduce the potential...The Congress will rescind funds that are not obligated in a timely way. This puts pressure on the DoD’s acquisition managers to put money on

  16. Multiple-user data acquisition and analysis system

    International Nuclear Information System (INIS)

    Manzella, V.; Chrien, R.E.; Gill, R.L.; Liou, H.I.; Stelts, M.L.

    1981-01-01

    The nuclear physics program at the Brookhaven National Laboratory High Flux Beam Reactor (HFBR) employs a pair of PDP-11 computers for the dual functions of data acquisition and analysis. The data acquisition is accomplished through CAMAC and features a microprogrammed branch driver to accommodate various experimental inputs. The acquisition computer performs the functions of multi-channel analyzers, multiscaling and time-sequenced multichannel analyzers and gamma-ray coincidence analyzers. The data analysis computer is available for rapid processing of data tapes written by the acquisition computer. The ability to accommodate many users is facilitated by separating the data acquisition and analysis functions, and allowing each user to tailor the analysis to the specific requirements of his own experiment. The system is to be upgraded soon by the introduction of a dual port disk to allow a data base to be available to each computer

  17. First and Second Language Acquisition in German Children Attending a Kindergarten Immersion Program: A Combined Longitudinal and Cross-Sectional Study

    Science.gov (United States)

    Bergström, Kirstin; Klatte, Maria; Steinbrink, Claudia; Lachmann, Thomas

    2016-01-01

    This study investigated first (L1) and second (L2) language acquisition in two age-matched groups of 2- to 6-year-old kindergarten children over the course of 2.5 years. The immersion group participated in a partial English immersion program whereas the conventional instruction group received a conventional L2 course (30 minutes per week); the…

  18. Commercial Building Energy Asset Score Program Overview and Technical Protocol (Version 1.1)

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Na; Goel, Supriya; Makhmalbaf, Atefe

    2013-08-09

    The U.S. Department of Energy (DOE) is developing a voluntary national scoring system for commercial buildings to help building owners and managers assess a building’s energy-related systems independent of operations. The goal of the score is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system, known as the Commercial Building Energy Asset Score, will allow building owners and managers to compare their building infrastructure against peers and track building upgrades over time. The system will also help other building stakeholders (e.g., building investors, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset scoring tool. The alternative methods that were considered prior to developing the current approach are described in the Program Overview and Technical Protocol Version 1.0.

  19. Review of Supervisory Control and Data Acquisition (SCADA) Systems

    Energy Technology Data Exchange (ETDEWEB)

    Reva Nickelson; Briam Johnson; Ken Barnes

    2004-01-01

    A review using open source information was performed to obtain data related to Supervisory Control and Data Acquisition (SCADA) systems used to supervise and control domestic electric power generation, transmission, and distribution. This report provides the technical details for the types of systems used, system disposal, cyber and physical security measures, network connections, and a gap analysis of SCADA security holes.

  20. Urology technical and non-technical skills development: the emerging role of simulation.

    Science.gov (United States)

    Rashid, Prem; Gianduzzo, Troy R J

    2016-04-01

    To review the emerging role of technical and non-technical simulation in urological education and training. A review was conducted to examine the current role of simulation in urology training. A PUBMED search of the terms 'urology training', 'urology simulation' and 'urology education' revealed 11,504 titles. Three hundred and fifty-seven abstracts were identified as English language, peer reviewed papers pertaining to the role of simulation in urology and related topics. Key papers were used to explore themes. Some cross-referenced papers were also included. There is an ongoing need to ensure that training time is efficiently utilised while ensuring that optimal technical and non-technical skills are achieved. Changing working conditions and the need to minimise patient harm by inadvertent errors must be taken into account. Simulation models for specific technical aspects have been the mainstay of graduated step-wise low and high fidelity training. Whole scenario environments as well as non-technical aspects can be slowly incorporated into the curriculum. Doing so should also help define what have been challenging competencies to teach and evaluate. Dedicated time, resources and trainer up-skilling are important. Concurrent studies are needed to help evaluate the effectiveness of introducing step-wise simulation for technical and non-technical competencies. Simulation based learning remains the best avenue of progressing surgical education. Technical and non-technical simulation could be used in the selection process. There are good economic, logistic and safety reasons to pursue the process of ongoing development of simulation co-curricula. While the role of simulation is assured, its progress will depend on a structured program that takes advantage of what can be delivered via this medium. Overall, simulation can be developed further for urological training programs to encompass technical and non-technical skill development at all stages, including

  1. Transuranic-waste program at EG and G Idaho, Inc. Annual technical report

    International Nuclear Information System (INIS)

    McKinley, K.B.

    1982-11-01

    This report summarizes the objectives and accomplishments of Transuranic (TRU) Waste Program conducted at EG and G Idaho, Inc., during FY 1982. The TRU Waste Program included: (1) Preparation of a revised draft of the Recommendation of a Long-Term Strategy (RLTS) document; (2) Preparation of environmental documentation, including a technical report, Environmental and Other Evaluations of Alternatives for Management of Defense Transuranic Waste at the Idaho National Engineering Laboratory, IDO-10103, as well as two environmental evaluations; (3) Preparation of a certification plan and procedures; (4) A nondestructive examination (NDE) project, which includes development of real-time radiography for waste certification, and container integrity equipment for waste container certification; (5) Development of an assay system; (6) Completion of a conceptual design for the Stored Waste Examination Pilot Plant (SWEPP) and SWEPP Support; and (7) Gas-generation analyses and tests. These TRU waste projects were funded at $1640K

  2. Unsupervised Language Acquisition

    Science.gov (United States)

    de Marcken, Carl

    1996-11-01

    This thesis presents a computational theory of unsupervised language acquisition, precisely defining procedures for learning language from ordinary spoken or written utterances, with no explicit help from a teacher. The theory is based heavily on concepts borrowed from machine learning and statistical estimation. In particular, learning takes place by fitting a stochastic, generative model of language to the evidence. Much of the thesis is devoted to explaining conditions that must hold for this general learning strategy to arrive at linguistically desirable grammars. The thesis introduces a variety of technical innovations, among them a common representation for evidence and grammars, and a learning strategy that separates the ``content'' of linguistic parameters from their representation. Algorithms based on it suffer from few of the search problems that have plagued other computational approaches to language acquisition. The theory has been tested on problems of learning vocabularies and grammars from unsegmented text and continuous speech, and mappings between sound and representations of meaning. It performs extremely well on various objective criteria, acquiring knowledge that causes it to assign almost exactly the same structure to utterances as humans do. This work has application to data compression, language modeling, speech recognition, machine translation, information retrieval, and other tasks that rely on either structural or stochastic descriptions of language.

  3. Forrest Ranch Acquisition, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brent

    2003-08-01

    Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The

  4. Analysis of System Training Impact for Major Defense Acquisition Programs (MDAPs): Training Systems Acquisition

    Science.gov (United States)

    2012-07-01

    Training Systems Acquisition IDA Document D-4648 Log: H 12-001032 July 2012 Approved for public release; distribution is unlimited...Background The Patriot system began because of the need to replace an aging and limited air defense system in the 1970s, the Nike -Hercules, and...simulation technology, embedded training and distributed learning (DoD Instruction 1322.26), and instrumentation systems that provide “anytime, anyplace

  5. Data acquisition system for light-ion irradiation creep experiment

    International Nuclear Information System (INIS)

    Hendrick, P.L.; Whitaker, T.J.

    1979-07-01

    Software was developed for a PDP11V/03-based data acquisition system to support the Light-Ion Irradiation Creep Experiment installed at the University of Washington Tandem Van de Graaff Accelerator. The software consists of a real-time data acquisition and storage program, DAC04, written in assembly language. This program provides for the acquisition of up to 30 chennels at 100 Hz, data averaging before storage on disk, alarming, data table display, and automatic disk switching. All analog data are acquired via an analog-to-digital converter subsystem having a resolution of 14 bits, a maximum throughput of 20 kHz, and an overall system accuracy of +-0.01%. These specifications are considered essential for the long-term measurement of irradiation creep strains and temperatures during the light-ion bombardment of irradiation creep specimens. The software package developed also contains a collection of FORTRAN programs designed to monitor a test while in progress. These programs use the foreground/background feature of the RT-11 operating system. The background programs provide a variety of services. The program, GRAFTR, allows transient data (i.e., prior to averaging) to be graphed at the graphics terminal. The program, GRAFAV, allows averaged data to be read from disk and displayed graphically at the terminal. The program, TYPAV, reads averaged data from disk and displays it at the terminal in tabular form. Other programs allow text messages to be written to disk, read from disk, and allow access to DAC04 initialization data. 5 figures, 18 tables

  6. EUROPEAN CROSS-BORDER MERGERS AND ACQUISITIONS- REALITIES AND PERSPECTIVES

    Directory of Open Access Journals (Sweden)

    Vancea Mariana

    2011-07-01

    Full Text Available This paper analyses the impact of the economic and financial crisis on merger and acquisition activity in Europe and the latest trends manifested on the cross-border merger and acquisition market involving European companies. Thus, a first objective of this research is to reveal the evolution of the European cross-border merger and acquisition activity in terms of dynamics, volume and structure. Another objective of this research is to reveal the short and medium term perspectives on mergers and acquisitions in Europe. Thus, under the continuous economic recovery of the European countries and the other worldwide economies, the recovery of financial markets and the growth of corporate profits, we shall witness an intensive cross-border merger and acquisition activity in Europe. The expansion engine of these operations seems to be represented by the emerging economies. This research is based on a systematic, logical and comparative analysis of scientific literature and statistical data regarding the cross-border mergers and acquisitions that involve European companies in recent years. This paper is part of the doctoral thesis Mergers and acquisitions- strategies of growth and development of enterprises. European and national particularities, coordinated by professor Ph.D. Alina Bădulescu from University of Oradea, Faculty of Economics. The doctoral research is supported by The Sectorial Operational Program for Human Resources Development 2007-2013, Contract POSDRU 59/1.5/S/1- Romanian researchers through modern and efficient doctoral programs.

  7. Spike-train acquisition, analysis and real-time experimental control using a graphical programming language (LabView).

    Science.gov (United States)

    Nordstrom, M A; Mapletoft, E A; Miles, T S

    1995-11-01

    A solution is described for the acquisition on a personal computer of standard pulses derived from neuronal discharge, measurement of neuronal discharge times, real-time control of stimulus delivery based on specified inter-pulse interval conditions in the neuronal spike train, and on-line display and analysis of the experimental data. The hardware consisted of an Apple Macintosh IIci computer and a plug-in card (National Instruments NB-MIO16) that supports A/D, D/A, digital I/O and timer functions. The software was written in the object-oriented graphical programming language LabView. Essential elements of the source code of the LabView program are presented and explained. The use of the system is demonstrated in an experiment in which the reflex responses to muscle stretch are assessed for a single motor unit in the human masseter muscle.

  8. Technical center for transportation analyses

    International Nuclear Information System (INIS)

    Foley, J.T.

    1978-01-01

    A description is presented of an information search/retrieval/research activity of Sandia Laboratories which provides technical environmental information which may be used in transportation risk analyses, environmental impact statements, development of design and test criteria for packaging of energy materials, and transportation mode research studies. General activities described are: (1) history of center development; (2) environmental information storage/retrieval system; (3) information searches; (4) data needs identification; and (5) field data acquisition system and applications

  9. Setting Performance Standards for Technical and Nontechnical Competence in General Surgery.

    Science.gov (United States)

    Szasz, Peter; Bonrath, Esther M; Louridas, Marisa; Fecso, Andras B; Howe, Brett; Fehr, Adam; Ott, Michael; Mack, Lloyd A; Harris, Kenneth A; Grantcharov, Teodor P

    2017-07-01

    The objectives of this study were to (1) create a technical and nontechnical performance standard for the laparoscopic cholecystectomy, (2) assess the classification accuracy and (3) credibility of these standards, (4) determine a trainees' ability to meet both standards concurrently, and (5) delineate factors that predict standard acquisition. Scores on performance assessments are difficult to interpret in the absence of established standards. Trained raters observed General Surgery residents performing laparoscopic cholecystectomies using the Objective Structured Assessment of Technical Skill (OSATS) and the Objective Structured Assessment of Non-Technical Skills (OSANTS) instruments, while as also providing a global competent/noncompetent decision for each performance. The global decision was used to divide the trainees into 2 contrasting groups and the OSATS or OSANTS scores were graphed per group to determine the performance standard. Parametric statistics were used to determine classification accuracy and concurrent standard acquisition, receiver operator characteristic (ROC) curves were used to delineate predictive factors. Thirty-six trainees were observed 101 times. The technical standard was an OSATS of 21.04/35.00 and the nontechnical standard an OSANTS of 22.49/35.00. Applying these standards, competent/noncompetent trainees could be discriminated in 94% of technical and 95% of nontechnical performances (P < 0.001). A 21% discordance between technically and nontechnically competent trainees was identified (P < 0.001). ROC analysis demonstrated case experience and trainee level were both able to predict achieving the standards with an area under the curve (AUC) between 0.83 and 0.96 (P < 0.001). The present study presents defensible standards for technical and nontechnical performance. Such standards are imperative to implementing summative assessments into surgical training.

  10. 7 CFR 3430.55 - Technical reporting.

    Science.gov (United States)

    2010-01-01

    ... required to submit other technical reports or submit the CRIS reports more frequently than annually... 7 Agriculture 15 2010-01-01 2010-01-01 false Technical reporting. 3430.55 Section 3430.55... ASSISTANCE PROGRAMS-GENERAL AWARD ADMINISTRATIVE PROVISIONS Post-Award and Closeout § 3430.55 Technical...

  11. Breaking Bad: Reforming Cyber Acquisition via Innovative Strategies

    Science.gov (United States)

    2015-04-01

    relate to infrastructure programs. Acquisition strategies for defensive tools, such as firewalls and antivirus software , will differ from acquisition...working on nuclear concepts for the benefit of the national will. These laboratories, as pointed out by Capt Patrick Roberts, also perform software ... software development, these scientists and engineers now possess experience making cyber systems that could be focused into the development of offensive

  12. EX6AFS: A data acquisition system for high-speed dispersive EXAFS measurements implemented using object-oriented programming techniques

    International Nuclear Information System (INIS)

    Jennings, G.; Lee, P.L.

    1995-01-01

    In this paper we describe the design and implementation of a computerized data-acquisition system for high-speed energy-dispersive EXAFS experiments on the X6A beamline at the National Synchrotron Light Source. The acquisition system drives the stepper motors used to move the components of the experimental setup and controls the readout of the EXAFS spectra. The system runs on a Macintosh IIfx computer and is written entirely in the object-oriented language C++. Large segments of the system are implemented by means of commercial class libraries, specifically the MacApp application framework from Apple, the Rogue Wave class library, and the Hierarchical Data Format datafile format library from the National Center for Supercomputing Applications. This reduces the amount of code that must be written and enhances reliability. The system makes use of several advanced features of C++: Multiple inheritance allows the code to be decomposed into independent software components and the use of exception handling allows the system to be much more reliable in the event of unexpected errors. Object-oriented techniques allow the program to be extended easily as new requirements develop. All sections of the program related to a particular concept are located in a small set of source files. The program will also be used as a prototype for future software development plans for the Basic Energy Science Synchrotron Radiation Center Collaborative Access Team beamlines being designed and built at the Advanced Photon Source

  13. Defense Acquisition Reform, 19602009: An Elusive Goal

    Science.gov (United States)

    2011-10-31

    the seven largest economies of the world (United States, China, Japan, Germany, France, United Kingdom, and Italy ).11 Major weapon systems...the Federal Acquisition Regulation.96 95 Ibid., pp. 20, 21. 96 Joseph Ferrara , “DoD’s 5000 Documents: Evolution and Change in Defense Acquisition...Wayne Smith. How Much Is Enough: Shaping the Defense Program, 1961–1969. New York: Harper & Row, 1971. Ferrara , Joseph. “DoD’s 5000 Documents

  14. Fast-Acquisition/Weak-Signal-Tracking GPS Receiver for HEO

    Science.gov (United States)

    Wintemitz, Luke; Boegner, Greg; Sirotzky, Steve

    2004-01-01

    A report discusses the technical background and design of the Navigator Global Positioning System (GPS) receiver -- . a radiation-hardened receiver intended for use aboard spacecraft. Navigator is capable of weak signal acquisition and tracking as well as much faster acquisition of strong or weak signals with no a priori knowledge or external aiding. Weak-signal acquisition and tracking enables GPS use in high Earth orbits (HEO), and fast acquisition allows for the receiver to remain without power until needed in any orbit. Signal acquisition and signal tracking are, respectively, the processes of finding and demodulating a signal. Acquisition is the more computationally difficult process. Previous GPS receivers employ the method of sequentially searching the two-dimensional signal parameter space (code phase and Doppler). Navigator exploits properties of the Fourier transform in a massively parallel search for the GPS signal. This method results in far faster acquisition times [in the lab, 12 GPS satellites have been acquired with no a priori knowledge in a Low-Earth-Orbit (LEO) scenario in less than one second]. Modeling has shown that Navigator will be capable of acquiring signals down to 25 dB-Hz, appropriate for HEO missions. Navigator is built using the radiation-hardened ColdFire microprocessor and housing the most computationally intense functions in dedicated field-programmable gate arrays. The high performance of the algorithm and of the receiver as a whole are made possible by optimizing computational efficiency and carefully weighing tradeoffs among the sampling rate, data format, and data-path bit width.

  15. 76 FR 31393 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-52; Introduction

    Science.gov (United States)

    2011-05-31

    ... 2010-017 Robinson. Ethics Programs. VI Technical Amendments... SUPPLEMENTARY INFORMATION: Summaries for... interim rule amends the FAR to implement Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and Executive Order 13423, Strengthening Federal Environmental, Energy...

  16. Overview of decommissioning and decontamination technical information support activities funded by the US Department of Energy's remedial action programs

    International Nuclear Information System (INIS)

    Owen, P.T.

    1986-01-01

    In 1979 the US Department of Energy (DOE) established the Remedial Action Program Information Center (RAPIC) at the Oak Ridge National Laboratory to provide technical information support to the Surplus Facilities Management Program, DOE's national decommissioning and decontamination (D and D) program which is managed by DOE's Richland Operations Office and UNC Nuclear Industries, Inc., and to the other DOE remedial action programs. Specific information activities that RAPIC performs to support the DOE's programs and the D and D community include: maintaining a computerized bibliographic database containing about 4500 annotated citations (about 2000 on D and D) and a database of 1800 contacts involved with remedial action work at radioactively contaminated sites; publishing an annual bibliography, ''Nuclear Facility Decommissioning and Site Remedial Actions, A Selected Bibliography,'' ORNL/EIS-154 (six volumes published); maintaining a document repository and providing copies of requested publications; and performing manual and computerized searches of the technical literature. The most significant RAPIC function is serving as a focal point for D and D information. With the extensive resources at its command, RAPIC is in a unique position to provide a comprehensive information base to the D and D community. DOE makes these services available to foster good public relations and promote cooperation and information exchange

  17. Proceedings of the Annual Meeting of the Council for Programs in Technical and Scientific Communication (14th, Orlando, Florida, October 7-9, 1987).

    Science.gov (United States)

    Geonetta, Sam C., Ed.

    Based on the notion of "reaching out," this proceedings presents papers from the annual meeting of the Council for Programs in Technical and Scientific Communication. Papers in the proceedings are: "Southern Tech's Technical Writing Certificate" (William S. Pfeiffer); "Reach Out and Quack Someone" (Daniel R. Jones);…

  18. Technical Manual. The ACT®

    Science.gov (United States)

    ACT, Inc., 2014

    2014-01-01

    This manual contains technical information about the ACT® college readiness assessment. The principal purpose of this manual is to document the technical characteristics of the ACT in light of its intended purposes. ACT regularly conducts research as part of the ongoing formative evaluation of its programs. The research is intended to ensure that…

  19. The US program of technical assistance to the Atomic Energy Agency of the Republic of Kazakstan

    International Nuclear Information System (INIS)

    Tittemore, G.; Kuzmycz, G.; Caudill, S.

    1995-01-01

    In the summer of 1993, the US Department of Energy (US government) received a formal invitation from the Atomic Energy Agency of the Republic of Kazakstan (AEARK) to visit Kazakstan to prepare a program for US cooperation with the AEARK to improve material protection, control, and accounting (MPCA) at Kazakstani nuclear facilities. As a result of this visit, an agreement for such cooperation was prepared and a program plan was formulated. The Program Plan includes provisions for Technical Working Group meetings, a site survey of a Kazakstani nuclear facility for possible upgrades in MPCA, assistance to AEARK in the regulatory area, training courses to familiarize AEARK and nuclear facility personnel with US safeguards practices, and supply of US safeguards equipment. This cooperative program is funded by the Nunn-Lugar program and the Department of Energy. The program is coordinated with the International Atomic Energy Agency and similar programs of other donor countries (Sweden, Japan, and the United Kingdom). This paper summarizes accomplishments of the program to date and future plans

  20. Control and data acquisition system for rotary compressor

    Directory of Open Access Journals (Sweden)

    Buczaj Marcin

    2017-01-01

    Full Text Available The rotary compressor (crimping machine is a machine designed for making hollow forgings. The rotary compressor is a prototype device designed and built at the Technical University of Lublin. The compressor is dedicated to perform laboratory tests related to the hollow forgings of various shapes using different materials. Since the rotary compressor is an experimental device, there is no control and acquisition data system available. The article presents the concept and the capabilities of the computer control and data acquisition system supporting rotary compressing process. The main task of software system is acquisition of force and kinetic parameters related to the analysed process of the rotary forging compression. The software allows the user to declare the course of the forming forgings. This system allows current recording and analysis of four physical values: feed rate (speed of working head movement, hydraulic oil pressure at inlet and outlet of hydraulic cylinder and the torque of engine. Application functions can be divided into three groups: the configuration of the pressing process, the acquisition and analysis of data from the pressing process and the recording and presentation of stored results. The article contains a detailed description about hardware and software implementation of mentioned functions.

  1. Building Professional and Technical Skills in the Use of Earth Observations through the NASA DEVELOP National Program: Best Practices & Lessons Learned

    Science.gov (United States)

    Crepps, G.; Ross, K. W.; Childs-Gleason, L. M.; Allsbrook, K. N.; Rogers, L.; Ruiz, M. L.; Clayton, A.

    2017-12-01

    The NASA DEVELOP National Program offers 10-week research opportunities to participants to work on rapid feasibility projects utilizing NASA Earth observations in a variety of applications, including ecological forecasting, water resources, disasters, and health and air quality. DEVELOP offers a unique collaborative environment in which students, recent graduates, and transitioning career professionals are placed on interdisciplinary teams to conduct projects. DEVELOP offers a variety of opportunities and resources to build participants technical skills in remote sensing and GIS, as well as interpersonal and leadership skills. As a capacity building program, DEVELOP assesses participants' growth by using entrance and exit personal growth assessments, as well as gathering general program feedback through an exit survey. All of this information is fed back into the program for continual improvement. DEVELOP also offers a progression of opportunities through which participants can advance through the program, allowing participants to build a diverse set of technical and leadership skills. This presentation will explore best practices including the use of pre- and post-growth assessments, offering advanced leadership opportunities, and overall capacity building impacts on participants.

  2. DAISY - the Oslo Cyclotron data acquisition system

    International Nuclear Information System (INIS)

    Ramsoey, T.

    1991-08-01

    The new CACTUS multidetector system for the Oslo Cyclotron consists of 8 particle telescopes, 28 NAI detectors and 2 Ge detectors. Each detector gives rise to one energy parameter and one time parameter. Thus, a total of 80 parameters are present. The counting rate is 100 kByte/s for the highest beam intensities. A new data acquisition system, DAISY, satisfying these demands has been designed. The present report is intended as a complete technical manual for the new system. 24 refs

  3. Variability in {sup 18}F-FDG PET/CT methodology of acquisition, reconstruction and analysis for oncologic imaging: state survey; Variabilidade metodologica na aquisicao, reconstrucao e analise de estudos de PET/CT oncologico com FDG-{sup 18}F: levantamento estadual

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, Andreia C.F. da S.; Druzian, Aline C.; Pianta, Diego B.; Bacelar, Alexandre, E-mail: acfischer@hcpa.edu.br [Hospital de Clinicas de Porto Alegre, RS (Brazil); Silva, Ana M. Marques da [Pontificia Universidade Catolica do Rio Grande do Sul (NIMed/PUC-RS), Porto Alegre, RS (Brazil). Faculdade de Fisica. Nucleo de Pesquisas em Imagens Medicas

    2016-07-01

    The SUV in {sup 18}F-FDG PET/CT oncological imaging is useful for cancer diagnosis, staging and treatment assessment. There are, however, several factors that can give rise to bias in SUV measurements. When using SUV as a diagnostic tool, one needs to minimize the variability in this measurement by standardization of patient preparation, acquisition and reconstruction parameters. The aim of this study is to evaluate the methodological variability in PET/CT acquisition in Rio Grande do Sul State. For that, in each department, a questionnaire was applied to survey technical information from PET/CT systems and about the acquisitions and analysis methods utilized. All departments implement quality assurance programs consistent with (inter)national recommendations. However, the acquisition and reconstruction methods of acquired PET data differ. The implementation of a harmonized strategy for quantifying the SUV is suggested, in order to obtain greater reproducibility and repeatability. (author)

  4. LabVIEW: a software system for data acquisition, data analysis, and instrument control.

    Science.gov (United States)

    Kalkman, C J

    1995-01-01

    Computer-based data acquisition systems play an important role in clinical monitoring and in the development of new monitoring tools. LabVIEW (National Instruments, Austin, TX) is a data acquisition and programming environment that allows flexible acquisition and processing of analog and digital data. The main feature that distinguishes LabVIEW from other data acquisition programs is its highly modular graphical programming language, "G," and a large library of mathematical and statistical functions. The advantage of graphical programming is that the code is flexible, reusable, and self-documenting. Subroutines can be saved in a library and reused without modification in other programs. This dramatically reduces development time and enables researchers to develop or modify their own programs. LabVIEW uses a large amount of processing power and computer memory, thus requiring a powerful computer. A large-screen monitor is desirable when developing larger applications. LabVIEW is excellently suited for testing new monitoring paradigms, analysis algorithms, or user interfaces. The typical LabVIEW user is the researcher who wants to develop a new monitoring technique, a set of new (derived) variables by integrating signals from several existing patient monitors, closed-loop control of a physiological variable, or a physiological simulator.

  5. Technical basis for the internal dosimetry program at the Y-12 Plant

    International Nuclear Information System (INIS)

    Ashley, J.C.; Barber, J.M.; Snapp, L.M.; Turner, J.E.

    1992-01-01

    Since the beginning of plant operations. almost all work with radioactive materials has involved isotopes associated with uranium, enriched or depleted in U 235 . While limited quantities of isotopes of elements other than uranium are present, workplace monitoring and precess knowledge have established that internal exposure from these other isotopes is insignificant in comparison with uranium. While the changing plant mission may necessitate the consideration of internal exposure from other isotopes at some point in time, only enriched and depleted uranium will be considered in this basis document. The portions of the internal dosimetry technical basis which may be unique to the Y-12 Plant is considered in this manual. This manual presents the technical basis of the routine in vivo and in vitro bioassay programs including choice of frequency, participant selection criteria, and action level guidelines. Protocols for special bioassay will be presented in the chapters which described the basis for intake, uptake, and dam assessment. A discussion of the factors which led to the need to develop a special biokinetic model for uranium at the Y-12 Plant, as well as a description of the model's basic parameters, are included in this document

  6. Program plan for the DOE Office of Fusion Energy First Wall/Blanket/Shield Engineering Technology Program. Volume II. Detailed technical plan. Revision 2

    International Nuclear Information System (INIS)

    1982-08-01

    The four sections which comprise Part II describe in detail the technical basis for each of the four Program Elements (PE's) of the FWBS Engineering Technology Program (ETP). Each PE is planned to be executed in a number of phases. The purpose of the DTP's is to delineate detailed near-term research, development, and testing required to establish a FWBS engineering data base. Optimum testing strategies and construction of test facilities where needed are identified. The DTP's are based on guidelines given by Argonne National Laboratory which included the basic programmatic goals and the requirements for the types of tests and test conditions

  7. Real-time development of data acquisition and analysis software for hands-on physiology education in neuroscience: G-PRIME.

    Science.gov (United States)

    Lott, Gus K; Johnson, Bruce R; Bonow, Robert H; Land, Bruce R; Hoy, Ronald R

    2009-01-01

    We report on the real-time creation of an application for hands-on neurophysiology in an advanced undergraduate teaching laboratory. Enabled by the rapid software development tools included in the Matlab technical computing environment (The Mathworks, Natick, MA), a team, consisting of a neurophysiology educator and a biophysicist trained as an electrical engineer, interfaced to a course of approximately 15 students from engineering and biology backgrounds. The result is the powerful freeware data acquisition and analysis environment, "g-PRIME." The software was developed from week to week in response to curriculum demands, and student feedback. The program evolved from a simple software oscilloscope, enabling RC circuit analysis, to a suite of tools supporting analysis of neuronal excitability and synaptic transmission analysis in invertebrate model systems. The program has subsequently expanded in application to university courses, research, and high school projects in the US and abroad as free courseware.

  8. The Educational and Technical Courses in the ELT Program in Turkey: Do They Contribute to ICT Skills?

    Science.gov (United States)

    Uzun, Levent

    2016-01-01

    The present study investigated the contribution of the educational and technical courses in the English Language Teacher Training Program (ELTTP) at universities in Turkey to the information and communication technologies (ICT) knowledge and skills of the students. The participants were 74 teachers/trainees who were attending their last year in…

  9. 14 CFR 399.91 - Air carrier participation in programs of technical assistance to airlines of less developed...

    Science.gov (United States)

    2010-01-01

    ... performance at reasonable cost and within a reasonable period of time consistent with the ability of the... interfere with the primary business of the subsidized carrier which is to provide air transportation in the... effectiveness in a technical assistance program would not only divert the attention of top management from...

  10. Data acquisition for X ray microprobe. User's manual

    International Nuclear Information System (INIS)

    2002-01-01

    A modified data acquisition software for X ray microprobe was developed by the Physics Group, Instrumentation Unit, IAEA Laboratories at Seibersdorf, with assistance from M. Bogovac, Croatia. The software consists of data acquisition (scanning and calibration), automatic positioning and micro-movement of sample, data reduction and evaluation. The acquisition software was designed in order to support different measurement set-ups which are applied in low-energy nuclear physics. The modification was done in 1999-2000 under the projects Nuclear Spectrometry and Utilization of Particle Accelerators. The manual supersedes the first version entitled Microanalysis Data Acquisition and Control Program published under Computer Manual Series, No. 9 in 1996. The software described in this manual is freely available from the IAEA upon request

  11. Tailoring the Acquisition Process in the U.S. Department of Defense

    Science.gov (United States)

    2015-01-01

    the associate directors, Paul DeLuca and Marc Robbins , for their insightful com- ments on this research. xvii Abbreviations ADM Acquisition Decision...by the SASSA program. Of these six, one was judged as a neutral contribution while five were judged as helpful in achiev- ing the program goals. No...tailored processes were judged as nega- tive contributions to meeting the rapid space acquisitions goals. (Johnson, 2010, p. 4) Also in regard to SE

  12. Instituting Learning-By-Doing Practices in Training Programs for Technical Writers, Usability Testers, and Translators

    DEFF Research Database (Denmark)

    Mousten, Birthe; Isohella, Suvi; Mara, Andrew

    2015-01-01

    Abstract - This workshop focuses on how to implement and grow highly successful and realistic learning-by-doing approaches to teaching and training professional communicators by connecting students from across the globe and across academic language programs. Workshop participants learn the method...... that instructors from the Trans-Atlantic & Pacific Project use when they form students enrolled in technical writing, usability testing, and translation courses into multilingual cross-cultural virtual teams....

  13. The Bochum on-line data acquisition system

    International Nuclear Information System (INIS)

    Paul, H.J.; Freiesleben, H.

    1986-01-01

    We describe an on-line data acquisition system based on a PDP 11 computer with CAMAC hardware. The software fully exploits the real-time features of the RSX-11M operating system. The basic characteristics of the program package, mainly written in FORTRAN 77, are: multitasking, shared common blocks, dynamical access to CAMAC hardware and data, and command orientated user interface. The system is particularly tailored for data acquisition in list mode of up to 64 parameters. (orig.)

  14. A Flexible Microcontroller-Based Data Acquisition Device

    OpenAIRE

    Hercog, Darko; Gergič, Bojan

    2014-01-01

    This paper presents a low-cost microcontroller-based data acquisition device. The key component of the presented solution is a configurable microcontroller-based device with an integrated USB transceiver and a 12-bit analogue-to-digital converter (ADC). The presented embedded DAQ device contains a preloaded program (firmware) that enables easy acquisition and generation of analogue and digital signals and data transfer between the device and the application running on a PC via USB bus. This d...

  15. 48 CFR 519.7016 - Program review.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Program review. 519.7016 Section 519.7016 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7016 Program review. At the conclusion of...

  16. 77 FR 20598 - Defense Federal Acquisition Regulation Supplement: Solicitation Provisions and Contract Clauses...

    Science.gov (United States)

    2012-04-05

    ... commercial items, that includes the clause at 252.225-7001, Buy American Act and Balance of Payments Program... Acquisitions of Commercial Items AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD... acquisition of commercial items and to specify flowdown of clauses to commercial subcontracts. DATES: Comments...

  17. A Conceptual Methodology for Assessing Acquisition Requirements Robustness against Technology Uncertainties

    Science.gov (United States)

    Chou, Shuo-Ju

    2011-12-01

    In recent years the United States has shifted from a threat-based acquisition policy that developed systems for countering specific threats to a capabilities-based strategy that emphasizes the acquisition of systems that provide critical national defense capabilities. This shift in policy, in theory, allows for the creation of an "optimal force" that is robust against current and future threats regardless of the tactics and scenario involved. In broad terms, robustness can be defined as the insensitivity of an outcome to "noise" or non-controlled variables. Within this context, the outcome is the successful achievement of defense strategies and the noise variables are tactics and scenarios that will be associated with current and future enemies. Unfortunately, a lack of system capability, budget, and schedule robustness against technology performance and development uncertainties has led to major setbacks in recent acquisition programs. This lack of robustness stems from the fact that immature technologies have uncertainties in their expected performance, development cost, and schedule that cause to variations in system effectiveness and program development budget and schedule requirements. Unfortunately, the Technology Readiness Assessment process currently used by acquisition program managers and decision-makers to measure technology uncertainty during critical program decision junctions does not adequately capture the impact of technology performance and development uncertainty on program capability and development metrics. The Technology Readiness Level metric employed by the TRA to describe program technology elements uncertainties can only provide a qualitative and non-descript estimation of the technology uncertainties. In order to assess program robustness, specifically requirements robustness, against technology performance and development uncertainties, a new process is needed. This process should provide acquisition program managers and decision

  18. United States Program for Technical assistance to IAEA Standards

    International Nuclear Information System (INIS)

    Morris, F.A.; Toquam, J.L.

    1993-11-01

    This concept paper explores the potential contribution of ''Knowledge Acquisition Skills'' in enhancing the effectiveness of international safeguards inspections by the International Atomic energy Agency (IAEA, or Agency) and identifies types of training that could be provided to develop or improve such skills. For purposes of this concept paper, Knowledge Acquisition Skills are defined broadly to include all appropriate techniques that IAEA safeguards inspectors can use to acquire and analyze information relevant to the performance of successful safeguards inspections. These techniques include a range of cognitive, analytic, judgmental, interpersonal, and communications skills that have the potential to help IAEA safeguards inspectors function more effectively

  19. 78 FR 63462 - Information Collection Requirement; Defense Federal Acquisition Regulation Supplement...

    Science.gov (United States)

    2013-10-24

    ... Relating to Organizational Conflict of Interest-Major Defense Acquisition Program; OMB Control Number 0704...] Information Collection Requirement; Defense Federal Acquisition Regulation Supplement; Organizational Conflict... submit comments, identified by OMB Control Number 0704-0477, using any of the following methods: [cir...

  20. Magnetic Fusion Energy Program. Volume I. Introduction, technical summaries, list of publications, etc., Appendices A-K. Annual report

    International Nuclear Information System (INIS)

    Aamodt, R.E.; Byrne, R.N.; Catto, P.J.

    1979-12-01

    An abstract was prepared for the progress summary on transport theory for open and closed magnetic configurations. Seven abstracts were prepared for included appendices of more detailed work on individual devices. Also included is a list of publications, technical presentations, and DOE program contributions

  1. Simulation Based Acquisition for NASA's Office of Exploration Systems

    Science.gov (United States)

    Hale, Joe

    2004-01-01

    In January 2004, President George W. Bush unveiled his vision for NASA to advance U.S. scientific, security, and economic interests through a robust space exploration program. This vision includes the goal to extend human presence across the solar system, starting with a human return to the Moon no later than 2020, in preparation for human exploration of Mars and other destinations. In response to this vision, NASA has created the Office of Exploration Systems (OExS) to develop the innovative technologies, knowledge, and infrastructures to explore and support decisions about human exploration destinations, including the development of a new Crew Exploration Vehicle (CEV). Within the OExS organization, NASA is implementing Simulation Based Acquisition (SBA), a robust Modeling & Simulation (M&S) environment integrated across all acquisition phases and programs/teams, to make the realization of the President s vision more certain. Executed properly, SBA will foster better informed, timelier, and more defensible decisions throughout the acquisition life cycle. By doing so, SBA will improve the quality of NASA systems and speed their development, at less cost and risk than would otherwise be the case. SBA is a comprehensive, Enterprise-wide endeavor that necessitates an evolved culture, a revised spiral acquisition process, and an infrastructure of advanced Information Technology (IT) capabilities. SBA encompasses all project phases (from requirements analysis and concept formulation through design, manufacture, training, and operations), professional disciplines, and activities that can benefit from employing SBA capabilities. SBA capabilities include: developing and assessing system concepts and designs; planning manufacturing, assembly, transport, and launch; training crews, maintainers, launch personnel, and controllers; planning and monitoring missions; responding to emergencies by evaluating effects and exploring solutions; and communicating across the OEx

  2. An Effective Health and Medical Technical Authority

    Science.gov (United States)

    Fogarty, Jennifer A.

    2009-01-01

    The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that

  3. Technical procedures for implementation of acoustics site studies, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-09-01

    The purpose and scope of the technical procedure for processing data from the tethered meteorological system are covered. Definitions, interfaces, and concurrent data needs are also addressed. This technical procedure describes how to control, organize, verify, and archive tethered meteorological system data. These data will be received at the processing location from the field measurement location and are part of the characterization of the Deaf Smith County Site, Texas for the salt repository program. These measurements will be made in support of the sound propagation study and are a result of environmental data requirements for acoustics. 6 refs., 15 figs., 5 tabs

  4. Fundamental Aeronautics Program: Overview of Propulsion Work in the Supersonic Cruise Efficiency Technical Challenge

    Science.gov (United States)

    Castner, Ray

    2012-01-01

    The Supersonics Project, part of NASA's Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2012) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  5. An method of verify period signal based on data acquisition card

    International Nuclear Information System (INIS)

    Zeng Shaoli

    2005-01-01

    This paper introduces an method to verify index voltage of Period Signal Generator by using data acquisition card. which it's error is less 0.5%. A corresponding Win32's program, which use voluntarily developed VxD to control data acquisition card direct I/O and multi thread technique for gain the best time scale precision, has developed in Windows platform. The program will real time collect inda voltage data and auto measure period. (authors)

  6. Benefit Analysis Report, United States Air Force Technical Order Management Systems (AFTOMS)

    Science.gov (United States)

    1989-08-01

    This report prepared by the Transportation Systems Center (TSC) concludes an analysis of the Technical Order (TO) costs and benefits, which was originally undertaken as part of the US Air Force Computer-aided Acquisition and Logistics Support (CALS) ...

  7. Funding of Vocational and Technical Education in Nigeria in Times ...

    African Journals Online (AJOL)

    Funding has been the bane of education in Nigeria. The global economic recession eventually came to complicate the matter. This notwithstanding, the focus of Vocational and Technical Education with regard to skills acquisition cannot be compromised. This paper x-rays the education funding pattern in Nigeria, assesses ...

  8. 75 FR 33752 - Defense Federal Acquisition Regulation Supplement; Organizational Conflicts of Interest in Major...

    Science.gov (United States)

    2010-06-15

    ... Conflicts of Interest in Major Defense Acquisition Programs AGENCY: Defense Acquisition Regulations System... extended an additional 30 days to provide additional time for interested parties to review the proposed... interested parties to review the proposed DFARS changes. Ynette R. Shelkin, Editor, Defense Acquisition...

  9. Summary of Sandia Laboratories technical capabilities

    International Nuclear Information System (INIS)

    1977-05-01

    The technical capabilities of Sandia Laboratories are detailed in a series of companion reports. In this summary the use of the capabilities in technical programs is outlined and the capabilities are summarized. 25 figures, 3 tables

  10. Technical and management information system: The tool for professional productivity on the space station program

    Science.gov (United States)

    Montoya, G.; Boldon, P.

    1985-01-01

    The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.

  11. Spent Fuel Test - Climax: technical measurements. Interim report, fiscal year 1982

    International Nuclear Information System (INIS)

    Patrick, W.C.; Ballou, L.B.; Butkovich, T.R.

    1983-02-01

    The Spent Fuel Test - Climax (SFT-C) is located 420 m below surface in the Climax stock granite on the Nevada Test Site. The test is being conducted for the US Department of Energy (DOE) under the technical direction of the Lawrence Livermore National Laboratory (LLNL). Eleven canisters of spent nuclear reactor fuel were emplaced, and six electrical simulators were energized April to May 1980, thus initiating a test with a planned 3- to 5-year fuel storage phase. The SFT-C operational objective of demonstrating the feasibility of packaging, transporting, storing, and retrieving highly radioactive fuel assemblies in a safe and reliable manner has been met. Three exchanges of spent fuel between the SFT-C and a surface storage facility furthered this demonstration. Technical objectives of the test led to development of a technical measurements program, which is the subject of this and two previous interim reports. Geotechnical, seismological, and test status data have been recorded on a continuing basis for the first 2-1/2 years of the test on more than 900 channels. Data continue to be acquired from the test. Some data are now available for analysis and are presented here. Highlights of activities this year include analysis of fracture data obtained during site characterization, laboratory studies of radiation effects and drilling damage in Climax granite, improved calculations of near-field heat transfer and thermomechanical response, a ventilation effects study, and further development of the data acquisition and management systems

  12. Technical reference book for the Energy Economic Data Base Program (EEDB)

    International Nuclear Information System (INIS)

    1986-12-01

    This distribution is the latest in a series published since 1978. The overall program purpose is to provide periodically updated, detailed base construction cost estimates for large nuclear electric operating plants. These data, which are representative of current US powerplant construction cost experience, are a useful contribution to program planning by the Office of the Assistant Secretary for Nuclear Energy. The eighth update incorporates the results of a comprehensive update of the technical and cost information for the pressurized water reactor (PWR), large scale prototype breeder reactor nuclear powerplant (LSPB), and 488 MWe high sulfur, coal-fired powerplant (HS5) data models. During the Phase VIII update, the LSPB, which was first incorporated into the previous update, was brought into full conformance with EEDB ground rules, and the level of detail of the data models was extended to the EEDB fully detailed level. We remind the user that the LSPB must still be considered a second-of-a-kind, pre-commercial unit, and any comparisons of it with other EEDB data models should be carefully made recognizing dissimilarity achievement of design and cost maturity, particularly for the nuclear steam supply system and other equipment

  13. Thermoelectric materials evaluation program. Quarterly technical task report No. 46

    International Nuclear Information System (INIS)

    Hampl, E.F. Jr.

    1976-02-01

    This forty-sixth Technical Task Report prepared under contract E(11-1)-2331 with the U.S. AEC and U.S. ERDA covers the performance period from October 1, 1975, to December 31, 1975. Highlights include the following tasks: N-type material development (material synthesis--gadolinium selenide compositions; material analyses; material processing; element contacting; ingradient compatibility and life testing; mechanical property characterization), TPM-217 P-type characterization (material preparation and analyses; element contacting; thermodynamic stability; isothermal chemical compatibility; ingradient compatibility and ingradient life testing; performance mapping of contacted and noncontacted elements; high-temperature partitioned P-legs), couple development (design and development of TPM-217/gadolinium selenide rare earth chalcogenide couple; design and development of TPM-217/3N-PbTe couples; advanced generator concepts), module development, liaison with Jet Propulsion Laboratory and material supply, liaison with GGA, and program management. 24 figures, 27 tables

  14. From chaos to order: The MicroStar data acquisition and analysis system

    Energy Technology Data Exchange (ETDEWEB)

    Rathbun, W.

    1991-03-01

    The MicroStar data acquisition and analysis software consists of several independent processes, although to the user it looks like a single program. These programs handle such functions as data acquisition (if any), data analysis, interactive display and data manipulation, and process monitoring and control. An overview of these processes and functions can be found in the paper as well as a more detailed description and users' guide.

  15. Designing training programs for perceptual-motor skills: practical implications from the serial reaction time task = Concevoir des programmes d’entraînement pour l’acquisition d’habiletés...

    NARCIS (Netherlands)

    Abrahamse, E.L.; Noordzij, Matthijs Leendert

    2011-01-01

    Within various contexts, such as sports and the military, training programs are being designed to effectively and efficiently guide perceptual-motor skill acquisition. Even though this notion is often underestimated, the design of such training programs may greatly benefit from findings and theories

  16. Job and task analysis for technical staff

    International Nuclear Information System (INIS)

    Toline, B.C.

    1991-01-01

    In September of 1989 Cooper Nuclear Station began a project to upgrade the Technical Staff Training Program. This project's roots began by performing job and Task Analysis for Technical Staff. While the industry has long been committed to Job and Task Analysis to target performance based instruction for single job positions, this approach was unique in that it was not originally considered appropriate for a group as diverse as Tech Staff. Much to his satisfaction the Job and Task Analysis Project was much less complicated for Technical Staff than the author had imagined. The benefits of performing the Job and Task Analysis for Technical Staff have become increasingly obvious as he pursues lesson plan development and course revisions. The outline for this presentation will be as follows: philosophy adopted; preparation of the job survey document; performing the job analysis; performing task analysis for technical staff and associated pitfalls; clustering objectives for training and comparison to existing program; benefits now and in the future; final phase (comparison to INPO guides and meeting the needs of non-degreed engineering professionals); and conclusion. By focusing on performance based needs for engineers rather than traditional academics for training the author is confident the future Technical Staff Program will meet the challenges ahead and will exceed requirements for accreditation

  17. Data acquisition and treatment unit for use in nuclear medicine

    Energy Technology Data Exchange (ETDEWEB)

    Annaix, C; Prieur, G; Vilayleck, S; Jallet, P [C.H.R., Angers (France)

    1981-01-01

    Here is below a one-channel data acquisition unit piloted through a minicomputer programmed by means of an advanced language of the Basic type. This unit allows, especially in nuclear medicine, pulse counts from a spectrometer according to a programmed sequence. Moreover, it provides treatment of measures as well as printing and filing of interpreted results. The acquisition unit is linked to the minicomputer through a RS 232 C serial mode, which ensures both easy operation and universal use of the system here described. Accuracy of measurement is also examined.

  18. Combining Multiple Data Acquisition Systems to Study Corticospinal Output and Multi-segment Biomechanics.

    Science.gov (United States)

    Asmussen, Michael J; Bailey, Aaron Z; Keir, Peter J; Potvin, Jim; Bergel, Tim; Nelson, Aimee J

    2016-01-09

    Transcranial magnetic stimulation techniques allow for an in-depth investigation into the neural mechanisms that underpin human behavior. To date, the use of TMS to study human movement, has been limited by the challenges related to precisely timing the delivery of TMS to features of the unfolding movement and, also, by accurately characterizing kinematics and kinetics. To overcome these technical challenges, TMS delivery and acquisition systems should be integrated with an online motion tracking system. The present manuscript details technical innovations that integrate multiple acquisition systems to facilitate and advance the use of TMS to study human movement. Using commercially available software and hardware systems, a step-by-step approach to both the hardware assembly and the software scripts necessary to perform TMS studies triggered by specific features of a movement is provided. The approach is focused on the study of upper limb, planar, multi-joint reaching movements. However, the same integrative system is amenable to a multitude of sophisticated studies of human motor control.

  19. Academic substance and location: The national technical university of Athens' five-year program

    DEFF Research Database (Denmark)

    Spyrou, Kostas J.; Psaraftis, Harilaos N.

    2014-01-01

    The National Technical University of Athens (NTUA) established a small Department of Naval Architecture and Marine Engineering in 1969, within the School of Mechanical and Electrical Engineering. Today, it is organized in four divisions, ship design and maritime transport, ship and marine...... hydrodynamics, marine structures, and marine engineering. To be awarded an engineering diploma in Greece, one has to spend a minimum of five years. The program at NTUA has also 10 semesters, out of which nine are dedicated to course study while the tenth is spend on the writing of a thesis. There is no tuition...

  20. Data acquisition system for linear PSD based neutron diffractometer

    International Nuclear Information System (INIS)

    Pande, S.S.; Borkar, S.P.; Behere, Anita; Ghodgaonkar, M.D.

    2001-01-01

    Single or multi-PSD configurations are used in different neutron diffractometer setups. A data acquisition system is developed to serve the gross requirements of all the diffractometer setups. It is also customized to specific requirements of different setups. The hardware is developed as a Transputer based add-on card. Most of the hardware functionality is handled in the Transputer program thus improving throughput of the system. The card can handle 16 RDCs, a few motor controls and on/off controls. The software comprises of a front-end Windows98 application, a Transputer program and a device driver. The data acquisition system performs data acquisition, analysis, display and storage. Analysis includes converting raw data of linear PSD to equiangular format, merging and clubbing the data to make a continuous equiangular spectrum. Calibration of individual PSD is a crucial activity in correctly merging the data coming from PSDs. (author)