  1. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  2. MODELING TRANSPORT IN THE DOWN GRADIENT PORTION OF THE 200-PO-1 OPERABLE UNIT AT THE HANFORD SITE

    MEHTA S; ALY AH; MILLER CW; MAYENNA A

    2009-12-03

    Remedial Investigations are underway for the 200-PO-l Operable Unit (OU) at the U.S. Department of Energy's Hanford Site in Washington State. To support the baseline risk assessment and evaluation of remedial alternatives, fate and transport modeling is being conducted to predict the future concentration of contaminants of potential concern in the 200-PO-1 OU. This study focuses on modeling the 'down gradient' transport of those contaminants that migrate beyond the 3-D model domain selected for performing detailed 'source area' modeling within the 200-PO-1 OU. The down gradient portion is defined as that region of the 200-PO-1 OU that is generally outside the 200 Area (considered 'source area') of the Hanford Site. A 1-D transport model is developed for performing down gradient contaminant fate and transport modeling. The 1-D transport model is deemed adequate based on the inferred transport pathway of tritium in the past and the observation that most of the contaminant mass remains at or near the water table within the unconfined aquifer of the Hanford Formation and the Cold-Creek/Pre-Missoula Gravel unit. The Pipe Pathway feature of the GoldSim software is used to perform the calculations. The Pipe Pathway uses a Laplace transform approach to provide analytical solutions to a broad range of advection-dominated mass transport systems involving one-dimensional advection, longitudinal dispersion, retardation, decay and ingrowth, and exchanges with immobile storage zones. Based on the historical concentration distribution data for the extensive tritium plume in this area, three Pipe Pathways are deemed adequate for modeling transport of contaminants. Each of these three Pipe Pathways is discretized into several zones, based on the saturated thickness variation in the unconfined aquifer and the location of monitoring wells used for risk assessment calculation. The mass fluxes of contaminants predicted to exit the source area model

  3. ALTERNATIVE REMEDIATION TECHNOLOGY STUDY FOR GROUNDWATER TREATMENT AT 200-PO-1 OPERABLE UNIT AT HANFORD SITE

    DADO MA

    2008-07-31

    This study focuses on the remediation methods and technologies applicable for use at 200-PO-I Groundwater Operable Unit (OU) at the Hanford Site. The 200-PO-I Groundwater au requires groundwater remediation because of the existence of contaminants of potential concern (COPC). A screening was conducted on alternative technologies and methods of remediation to determine which show the most potential for remediation of groundwater contaminants. The possible technologies were screened to determine which would be suggested for further study and which were not applicable for groundwater remediation. COPCs determined by the Hanford Site groundwater monitoring were grouped into categories based on properties linking them by remediation methods applicable to each COPC group. The screening considered the following criteria. (1) Determine if the suggested method or technology can be used for the specific contaminants found in groundwater and if the technology can be applied at the 200-PO-I Groundwater au, based on physical characteristics such as geology and depth to groundwater. (2) Evaluate screened technologies based on testing and development stages, effectiveness, implementability, cost, and time. This report documents the results of an intern research project conducted by Mathew Dado for Central Plateau Remediation in the Soil and Groundwater Remediation Project. The study was conducted under the technical supervision of Gloria Cummins and management supervision of Theresa Bergman and Becky Austin.

  4. 200-BP-5 operable unit treatability test report

    The 200-BP-5 Operable Unit was established in response to recommendations presented in the 200 East Groundwater Aggregate Area Management Study Report (AAMSR) (DOE-RL 1993a). Recognizing different approaches to remediation, the groundwater AAMSR recommended separating groundwater from source and vadose zone operable units and subdividing 200 East Area groundwater into two operable units. The division between the 200-BP-5 and 200-PO-1 Operable Units was based principally on source operable unit boundaries and distribution of groundwater plumes derived from either B Plant or Plutonium/Uranium Extraction (PUREX) Plant liquid waste disposal sites

  5. Multi-unit operations considerations

    Several nuclear weapons programs have or are pursuing the implementation of multi-unit operations for tasks such as disassembly and inspection, and rebuild. A multi-unit operation is interpreted to mean the execution of nuclear explosive operating procedures in a single facility by two separate teams of technicians. The institution of a multi-unit operations program requires careful consideration of the tools, resources, and environment provided to the technicians carrying out the work. Therefore, a systematic approach is necessary to produce safe, secure, and reliable processes. In order to facilitate development of a more comprehensive multi-unit operations program, the current work details categorized issues that should be addressed prior to the implementation of multi-unit operations in a given weapons program. The issues have been organized into the following categories: local organizational conditions, work process flow/material handling/workplace configuration, ambient environmental conditions, documented safety analysis, and training

  6. Monitoring and controlling unit operations

    Cypes, Stephen; Uhrich, M; Carlson, Eric; Kolosov, Oleg; Padowitz, David; Bennett, James; Matsiev, L

    2007-01-01

    Fluid sensor methods and systems adapted for monitoring and/or controlling distillation operations in fluidic systems, such as batch distillation operations or continuous distillation operations, are disclosed. Preferred embodiments are directed to process monitoring and/or process control for unit operations involving endpoint detemlination of a distillation, for example, as applied to a liquid-componentswitching operation (e.g., a solvent switching operation), a liquid-liquid separation ope...

  7. Organization of Control Units with Operational Addressing

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  8. Environmental Engineering Unit Operations and Unit Processes Laboratory Manual.

    O'Connor, John T., Ed.

    This manual was prepared for the purpose of stimulating the development of effective unit operations and unit processes laboratory courses in environmental engineering. Laboratory activities emphasizing physical operations, biological, and chemical processes are designed for various educational and equipment levels. An introductory section reviews…

  9. Physical protection of nuclear operational units

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.)

  10. Mineral operations outside the United States

    U.S. Geological Survey, Department of the Interior — Mineral facilities and operations outside the United States compiled by the National Minerals Information Center of the USGS. This representation combines source...

  11. Nuclear units operating improvement by using operating experience

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  12. Operating performance of LWR nuclear generating units

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  13. Operational safety evolution in Spanish nuclear units

    Within the European Union, Spain is the fourth largest producer of nuclear power and the third in terms of reliance on this kind of electricity generation. At present, the total nuclear capacity installed is 7400 MW(e), of which 6780 came into commercial operation between 1981 and 1988. During the past decade Spain has mainly been involved with construction activity. However, Spain has more than 100 reactor-years of operating experience and new regulations, regulatory guides and requirements have been introduced. The nuclear experience acquired and the degree of maturity during the past 20 years have made it evident since the beginning of the 1980s that additional measures would be needed in order to reach the intended level of safety, reliability and economic operation of Spanish nuclear units. New safety criteria and methodologies developed through the 1980s and safety and quality culture concepts were considered as well. A systematic evaluation programme for two units (Santa Maria de Garona and Jose Cabrera NPPs) built to earlier standards was developed and significant post-Three Mile Island requirements were implemented for the remaining Spanish units. The paper summarizes the organization structures established by the Spanish nuclear sector to follow and covers significant safety and operational issues and the important areas in which safety improvements were made to upgrade operational safety in our nuclear power plants. Areas such as probabilistic safety analysis and its applications, technology innovation incorporated in some safety systems, accident management procedures and guidance, operational experience feedback, safety and quality culture programmes, etc., are described in the paper, with the lessons learned from each process and the benefits obtained. (author). 8 figs

  14. 200-UP-2 operable unit radiological surveys

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  15. NIC atomic operation unit with caching and bandwidth mitigation

    Hemmert, Karl Scott; Underwood, Keith D.; Levenhagen, Michael J.

    2016-03-01

    A network interface controller atomic operation unit and a network interface control method comprising, in an atomic operation unit of a network interface controller, using a write-through cache and employing a rate-limiting functional unit.

  16. Higher-Order Thinking in the Unit Operations Laboratory.

    Miller, Ronald L.; Ely, James F.; Baldwin, Robert M.; Olds, Barbara M.

    1998-01-01

    Argues that the unit operations laboratory provides an ideal setting to help chemical engineering students become better engineering practitioners. Describes a summer program at the Colorado School of Mines that incorporates experience into a unit operations laboratory. (DDR)

  17. Incorporating Safety into a Unit Operations Laboratory Course.

    King, Julia A.

    1998-01-01

    Details the incorporation of safety procedures and issues into the curriculum of an undergraduate chemical engineering unit operations laboratory course. Includes checklists and sample reporting forms. (DDR)

  18. Sanitary Engineering Unit Operations and Unit Processes Laboratory Manual.

    American Association of Professors in Sanitary Engineering.

    This manual contains a compilation of experiments in Physical Operations, Biological and Chemical Processes for various education and equipment levels. The experiments are designed to be flexible so that they can be adapted to fit the needs of a particular program. The main emphasis is on hands-on student experiences to promote understanding.…

  19. Integrated Ground Operations Demonstration Units Project

    National Aeronautics and Space Administration — The overall goal of the project is to demonstrate cost efficient cryogenic operations on a relevant scale that can be projected onto future Spaceport architectures...

  20. System for monitoring and controlling unit operations that include distillation

    Cypes, Stephen; Uhrich, M; Kolosov, Oleg; Carlson, Eric; Padowitz, David; Bennett, James; Matsiev, L

    2009-01-01

    Fluid sensor methods and systems adapted for monitoring and/or controlling distillation operations in fluidic systems, such as bath distillation operations or continuous distillation operations, are disclosed. Preferred embodiments are directed to process monitoring and/or process control for unit operations involving endpoint determination of a distillation, for example, as applied to a liquid-component-switching operation (e.g., a solvent switehing operation), a liquid-liquid separation ope...

  1. Ergonomic aspects in designing unit operator's console

    The question is discussed of raising operating reliability, efficiency and safety of nuclear power plants by the gradual replacement of man in the process of control by automatic control systems. An analysis of the failure of complex technological systems has shown that the human factor is the cause of 70 to 90% of all accidents. The areas are listed of the most frequent use of computer systems in nuclear power (automation of testing and control, upgrading communication between operator and technological equipment, evaluation and signalling of warnings and failures, and rationalization of protocol writing). The main problems of the use of computer based control and information systems include the integration of computer-based and classical instrumentation, the distribution of functions between operator and computer, the methods of data pre-processing, the use of graphics, optimized data coding, etc. (J.C.)

  2. Weighted Composition Operators between Hardy Spaces on the Unit Ball

    XUHui-ming; LIUTai-shun

    2004-01-01

    We consider the weighted composition operators between Hardy spaces on the unit ball, and obtain some sufficient and necessary conditions of bounded or compact weighted composition operators. We also prove that the operator from H1 to H1 is compact if and only if it is weakly compact. Meanwhile, we get the analogue on the Bergman spaces.

  3. Unit costs of waste management operations

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ''cradle to grave'') cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics

  4. Unit costs of waste management operations

    Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

    1994-04-01

    This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

  5. Study on safety operation for large hydroelectric generator unit

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  6. Study on safety operation for large hydroelectric generator unit

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  7. Crushed Stone Operations in the United States - Direct Download

    U.S. Geological Survey, Department of the Interior — This map layer includes crushed stone operations in the United States. These data were obtained from information reported voluntarily to the USGS by the aggregate...

  8. Sand and Gravel Operations in the United States - Direct Download

    U.S. Geological Survey, Department of the Interior — This map layer includes sand and gravel operations in the United States. These data were obtained from information reported voluntarily to the USGS by the aggregate...

  9. Eielson Air Force Base Operable Unit 2 baseline risk assessment

    Lewis, R.E.; Jarvis, T.T.; Jarvis, M.R.; Whelan, G.

    1994-10-01

    Operable Unit 2 at Eielson Air Force Base (AFB) near Fairbanks, is one of several operable units characterized by petroleum, oil, and lubricant contamination, and by the presence of organic products floating at the water table, as a result of Air Force operations since the 1940s. The base is approximately 19,270 acres in size, and comprises the areas for military operations and a residential neighborhood for military dependents. Within Operable Unit 2, there are seven source areas. These source areas were grouped together primarily because of the contaminants released and hence are not necessarily in geographical proximity. Source area ST10 includes a surface water body (Hardfill Lake) next to a fuel spill area. The primary constituents of concern for human health include benzene, toluene, ethylbenzene, and xylenes (BTEX). Monitored data showed these volatile constituents to be present in groundwater wells. The data also showed an elevated level of trace metals in groundwater.

  10. Maintenance management of Hamaoka Nuclear Power Plants Unit 1 and Unit 2 terminated operation

    Hamaoka NPP Unit 1 and Unit 2 terminated operation on January 30th of 2009 and submitted an application for the decommissioning plan licensing on June 1st of 2009. At present due to the lack of clarity about requirements for maintenance at decommissioning stage such as Hamaoka NPP Unit 1 and Unit 2, we considered their maintenance optimization and planed maintenance management categorized three classifications in anticipation of the future decommissioning. (author)

  11. Feasibility study report for the 200-BP-1 operable unit

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9x10-5

  12. Feasibility study report for the 200-BP-1 operable unit

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 x 105

  13. Papers on reactor physics for operators and unit managers

    The monograph contains papers submitted to the Dukovany nuclear power plant personnel with the aim of improving professional knowledge of reactor operators and unit managers and helping them in their preparation for state examinations. It presents an easy to understand explanation of phenomena unit control room personnel actually encounter. The following topics are covered: radioactivity, nuclear reactions, nuclear fission and the fate of neutrons in the reactor; delayed neutrons; reactor period, reactivity; subcriticality and transition to criticality; heat generation in the reactor; reactivity coefficients; reactivity effects during the fuel cycle; reactivity compensation during power changes; reactor response to reactivity changes; xenon poisoning, samarium poisoning; residual power; unit start-up after refuelling; unit power rise to the minimal controllable level following emergency shutdown; shutdown concentrations; reactor control and safety system; scram rod drop; neutron sensors in the reactor; monitoring system inside the reactor; 3rd unit computer; ''operator's ten commandments''. (P.A.). 36 figs., 2 tabs., 6 refs

  14. Limited field investigation for the 200-UP-1 operable unit

    The 200-UP-1 Groundwater Operable Unit is located in the southern portion of the 200 West Area on the Hanford Site in Washington State. The operable unit is located adjacent to the 200-ZP-1 Groundwater Operable Unit and underlies a significant part of seven source operable units: 200-RO-1, 200-RO-2, 200-RO-3, 200-RO-4, 200-SS-2, 200-UP-2, and 200-UP-3. Remedial efforts in the 100-ZP-1 Operable Unit focus on addressing volatile organic contamination in the aquifer. The focus of the 200-UP-1 limited field investigation (LFI) is on contaminated aquifer soils and groundwater within its boundary, with the exception of uranium and technetium-99 plumes, which are addressed by an existing 200-UP-1 interim remedial measure (IRM). The LFI approach is driven by general and specific data needs required to refine the site conceptual model and conduct a risk assessment. Activities supporting the LFI include drilling, well construction, sampling and analysis, data validation, geologic and geophysical logging, aquifer testing, measuring depth to water, and evaluating geodetic survey and existing analytical data

  15. Limited field investigation for the 200-UP-1 operable unit

    NONE

    1996-11-01

    The 200-UP-1 Groundwater Operable Unit is located in the southern portion of the 200 West Area on the Hanford Site in Washington State. The operable unit is located adjacent to the 200-ZP-1 Groundwater Operable Unit and underlies a significant part of seven source operable units: 200-RO-1, 200-RO-2, 200-RO-3, 200-RO-4, 200-SS-2, 200-UP-2, and 200-UP-3. Remedial efforts in the 100-ZP-1 Operable Unit focus on addressing volatile organic contamination in the aquifer. The focus of the 200-UP-1 limited field investigation (LFI) is on contaminated aquifer soils and groundwater within its boundary, with the exception of uranium and technetium-99 plumes, which are addressed by an existing 200-UP-1 interim remedial measure (IRM). The LFI approach is driven by general and specific data needs required to refine the site conceptual model and conduct a risk assessment. Activities supporting the LFI include drilling, well construction, sampling and analysis, data validation, geologic and geophysical logging, aquifer testing, measuring depth to water, and evaluating geodetic survey and existing analytical data.

  16. Analysis on Operation Reliability of Generating Units in 2005

    Zuo Xiaowen; Chu Xue

    2007-01-01

    @@ The weighted average equivalent availability factor of thermal power units in 2005 was 92.34%, an increase of 0.64 percentage points as compared to that in 2004. The average equivalent availability factor in 2005 was 92.22%, a decrease of 0.95 percentage points as compared to that in 2004. The nationwide operation reliability of generating units in 2005 was analyzed completely in this paper.

  17. 200-BP-5 operable unit Technical Baseline report

    Jacques, I.D.; Kent, S.K.

    1991-10-01

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted.

  18. 200-BP-5 operable unit Technical Baseline report

    This report supports development of a remedial investigation/feasibility study work plan for the 200-BP-5 operable unit. The report summarizes baseline information for waste sites and unplanned release sites located in the 200-BP-5 operable unit. The sites were investigated by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (Westinghouse Hanford). The investigation consisted of review and evaluation of current and historical Hanford Site reports, drawings, and photographs, and was supplemented with recent inspections of the Hanford Site and employee interviews. No field investigations or sampling were conducted

  19. Peacekeeping operations: From the birth of the United Nations onward

    Klein, Lawrence R.

    2006-01-01

    The article reviews proposals to create a United Nations standing armed force as opposed to a rapid reaction force. In either case, to play its optimal role in the future of peacekeeping operations, the U.N. will have to face up to new demands, beyond those contemplated in 1945. Given the resistance in Iraq that has surprised two major powers (the United States and the United Kingdom), it is plausible that a truly collective effort by the U.N., even at higher costs in people and finance, meri...

  20. Operational safety experience reporting in the United States

    Licensees of nuclear power plants in the United States have many reporting requirements included in their technical specifications and the code of federal regulations, title 10. The Nuclear Regulatory Commisson receives these reports and utilizes them in its regulatory program. Part of this usage includes collecting and publishing this operating experience data in various reports and storing information in various data systems. This paper will discuss the data systems and reports on operating experience published and used by the NRC. In addition, some observations on operating experience will be made. Subjects included will be the Licensee Event Report (LER) Data File, the Operating Unit Status Report (Gray Book), Radiation Exposure Reports, Effluents Reports, the Nuclear Plant Reliability Data System, Current Events, Bulletin Wrapups and Annual Summaries. Some of the uses of the reports and systems will be discussed. The Abnormal Occurence Report to the US Congress will also be described and discussed. (author)

  1. United States Special Operations command professional military education

    Dexter, Robert M.

    2013-01-01

    Approved for public release; distribution is unlimited. Reissued 10 Sep 2015 to revise acknowledgements and narrative on p. 6. The United States Special Operations Command does not have an intermediate-level professional military education program for its officers. Current service-provided PME programs are not adequately meeting the educational goals for officers as required by USSOCOM. Through the Joint Special Operations University, SOCOM could establish its own PME program for office...

  2. Semiconductor Chemical Reactor Engineering and Photovoltaic Unit Operations.

    Russell, T. W. F.

    1985-01-01

    Discusses the nature of semiconductor chemical reactor engineering, illustrating the application of this engineering with research in physical vapor deposition of cadmium sulfide at both the laboratory and unit operations scale and chemical vapor deposition of amorphous silicon at the laboratory scale. (JN)

  3. Community-Based Presentations in the Unit Operations Laboratory

    Mitchell, Brian S.; Law, Victor J.

    2005-01-01

    A method for incorporating community­-based oral presentations into the undergraduate chemical engineering unit operations laboratory experience is described. Examples are given of appropriate topics and how these presentations can be incorporated into the experiment sequence. Course evaluations reflect the fact that these presentations are an…

  4. An Automated Distillation Column for the Unit Operations Laboratory

    Perkins, Douglas M.; Bruce, David A.; Gooding, Charles H.; Butler, Justin T.

    2005-01-01

    A batch distillation apparatus has been designed and built for use in the undergraduate unit operations laboratory course. The column is fully automated and is accompanied by data acquisition and control software. A mixture of 1­-propanol and 2-­propanol is separated in the column, using either a constant distillate rate or constant composition…

  5. The Development and Deployment of a Virtual Unit Operations Laboratory

    Vaidyanath, Sreeram; Williams, Jason; Hilliard, Marcus; Wiesner, Theodore

    2007-01-01

    Computer-simulated experiments offer many benefits to engineering curricula in the areas of safety, cost, and flexibility. We report our experience in developing and deploying a computer-simulated unit operations laboratory, driven by the guiding principle of maximum fidelity to the physical lab. We find that, while the up-front investment in…

  6. Unit Operation Experiment Linking Classroom with Industrial Processing

    Benson, Tracy J.; Richmond, Peyton C.; LeBlanc, Weldon

    2013-01-01

    An industrial-type distillation column, including appropriate pumps, heat exchangers, and automation, was used as a unit operations experiment to provide a link between classroom teaching and real-world applications. Students were presented with an open-ended experiment where they defined the testing parameters to solve a generalized problem. The…

  7. Implementation and Analysis of Hemodialysis in the Unit Operations Laboratory

    Madihally, Sundararajan V.; Lewis, Randy S.

    2007-01-01

    To enhance bioengineering in the chemical engineering curriculum, a Unit Operations experiment simulating the hemodialysis of creatinine was implemented. The blood toxin creatinine was used for developing a more realistic dialysis experiment. A dialysis model is presented that allows students to assess the validity of model assumptions. This work…

  8. Adaptation of Professional Skills in the Unit Operations Laboratory

    Rende, Deniz; Rende, Sevinc; Baysal, Nihat

    2012-01-01

    We introduce the design of three consecutive unit operations laboratory (UOL) courses that retain the academic rigor of the course while incorporating skills essential for professional careers, such as ability to propose ideas, develop practical solutions, participate in teamwork, meet deadlines, establish communication between technical support…

  9. Optimal operation of cogeneration units. State of art and perspective

    Optimal operation of cogeneration plants and of power plant fueling waste products is a complex challenge as they have to fulfill, beyond the contractual obligation of electric power supply, the constraints of supplying the required thermal energy to the user (for cogeneration units) or to burn completely the by-products of the industrial complex where they are integrated. Electrical power market evolution is pushing such units to a more and more volatile operation caused by uncertain selling price levels. This work intends to pinpoint the state of art in the optimization of these units outlining the important differences among the different size and cycles. The effect of the market liberalization on the automation systems and the optimization algorithms will be discussed

  10. Operating experiences with high standard mobile solidification units

    According to current regulations in the Federal Republic of Germany, liquid nuclear wastes from power plants have to be solidified before being finally stored, preferably in geological salt formations. Solidification is necessary to provide a safeguard in addition to the geological barrier. This paper discusses on-site solidification of liquid nuclear wastes in mobile cementation units as an alternative to the transportation of liquid wastes to remote conditioning plants or to the solidification of the wastes in a stationary unit of the power plant's own. An account is rendered on the experiences gained from the operation of the mobile DEWA-solidification unit, which has been in use since 1977, and a description of the new MOWA-solidification unit is given

  11. Expert system for operational personnel support during power unit operation control in regulation range

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  12. Is fumigation enough for air conditioning units in operation theatres and Intensive care units?

    Anasua Deb; Sharmila Raut; Sunita Gajbhiye; Priyanka Patil; Sanjay Raut

    2016-01-01

    Background: Strict asepsis is necessary in operating theatres (OT) and intensive care units (ICU) as the patients undergo invasive procedures. The filters of contaminated air conditioning (AC) units provide a niche for proliferation of fungi and production of fungal spores. Methods: The routine procedure for maintenance of sterile atmosphere in our hospital, i.e. fumigation and mopping walls with disinfectants often fail to address these fungal spores of the AC filters. We therefore carri...

  13. Advanced Transport Operating System (ATOPS) control display unit software description

    Slominski, Christopher J.; Parks, Mark A.; Debure, Kelly R.; Heaphy, William J.

    1992-01-01

    The software created for the Control Display Units (CDUs), used for the Advanced Transport Operating Systems (ATOPS) project, on the Transport Systems Research Vehicle (TSRV) is described. Module descriptions are presented in a standardized format which contains module purpose, calling sequence, a detailed description, and global references. The global reference section includes subroutines, functions, and common variables referenced by a particular module. The CDUs, one for the pilot and one for the copilot, are used for flight management purposes. Operations performed with the CDU affects the aircraft's guidance, navigation, and display software.

  14. Stability Analysis for Operation of DG Units in Smart Grids

    Pouresmaeil, Edris; Shaker, Hamid Reza; Mehrasa, Majid;

    2015-01-01

    This paper presents a multifunction control strategy for the stable operation of Distributed Generation (DG) units during grid integration. The proposed control model is based on Direct Lyapunov Control (DLC) theory and provides a stable region for the appropriate operation of DG units during grid...... integration. Using DLC technique in DG technology can provide the continuous injection of maximum active power in fundamental frequency from the DG source to the grid, compensating all reactive power and harmonic current components of grid-connected loads through the integration of DG link into the grid....... Application of this concept can guarantee to reduce the stress on the grid during the energy demand peak. Simulation results are presented to demonstrate the proficiency and performance of the proposed DLC technique in DG technology....

  15. Using AI Planning Techniques for Army Small Unit Operations

    Tate, Austin; Levine, John; Jarvis, Peter; Dalton, Jeffrey

    1999-01-01

    In this paper, we outline the requirements of a planning and decision aid to support US Army small unit operations in urban terrain and show how AI planning technologies can be exploited in that context. The work is a rare example of a comprehensive use of AI technologies across the whole planning lifecycle, set in a realistic application in which the actual user community set the requirements. The phases involved include: * Domain knowledge elicitation * Rich plan representation and use ...

  16. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    Kupar, J; Sadika Baladi, S; Mark Amidon, M

    2007-05-22

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

  17. SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT

    This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed

  18. Modeling of biopharmaceutical processes. Part 2: Process chromatography unit operation

    Kaltenbrunner, Oliver; McCue, Justin; Engel, Philip;

    2008-01-01

    Process modeling can be a useful tool to aid in process development, process optimization, and process scale-up. When modeling a chromatography process, one must first select the appropriate models that describe the mass transfer and adsorption that occurs within the porous adsorbent. The theoret...... theoretical understanding of chromatographic behavior can augment available experimental data and aid in the design of specific experiments to develop a more complete understanding of the behavior of a unit operation....

  19. Operating experience on full flow condensate polishing unit of FBTR

    The steam generator of Fast Breeder Test Reactor at Kalpakkam (India) is an Once Through type Sodium heated Steam Generator (OTSG). Therefore, the feed water is maintained at a high purity level. To achieve this, a full-flow deep bed Condensate Polishing Unit (CPU) has been installed in the circuit and has been in operation for the past 7 years. However, problems such as premature termination of operation cycle of the CPU, enhanced impurity pickup resulting in increased load for CPU, early silica breakthrough etc were observed in many instances leading to deterioration in the feed water quality. This paper describes the modifications that were carried out in steam water circuit to overcome the above mentioned problems. The experience in operating the CPU is discussed in detail here. Further modifications to enhance the performance are also suggested in this paper. (author)

  20. Reconfigurable ternary optical processor based on row operation unit

    Kai, SONG; LiPing, YAN

    2015-09-01

    In order to eliminate the difference between the data bits and the pixel bits of the processors in the logic operation of Ternary Optical Computer (TOC), and to make the reconfiguration of the processors more convenient and efficient, while extending the research ideas of TOC, the paper presents a new typical optical component, which is row operation unit (ROU). The features, circuit implementations, and commands for the reconfiguration of ROU are also discussed in detail. On this basis, the reconfigurable ternary optical processor (RTOP) was designed and achieved, which reduces the complexity of the processor management software. Finally, the experiments of reconfigurable ROU are performed, which shows that the principles of RTOP are correct, and all 81 commands for the reconfiguration are effective. Each of the two-input, tri-valued logic operations with thousands of data bits can be concurrently achieved in RTOP.

  1. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants) and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-theshelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  2. The design and orbital operation of Space Flyer Unit

    Kuriki, K.; Ninomiya, K.; Nagatomo, M.; Tsuya, N.; Kawachi, M.; Ijichi, K.; Kimura, H.

    The Space Flyer Unit is a retrievable and re-usable multipurpose platform. The first SFU mission (SFU-1) will be launched by Japanese H-II rocket and retrieved by the United States Space Shuttle. SFU system consists of the core system and payloads. The core system provides standardized interfaces and services for payload integration and operation. The core system is reusable with proper post mission maintenances. Electrical furnaces for material processing, technology development experiments such as two-dimensionally deployable mechanism, electric propulsion experiment, a partial model of Japanese Experiment Module of the Space Station and a space infrared telescope are among the payloads of SFU-1. In addition to ground based system, SFU will be equipped with an onboard navigation and guidance system which will be used for the rendezvous with Space Shuttle. The SFU-1 launch date is targeted for the first quarter of 1994 and retrieved after several months of operation in orbit. The brief description of the core system and the in-orbit operation, emphasized on retrieval phase, will be presented in this paper.

  3. Provence 250 MWe unit: the largest CFB boiler in operation

    Delot, P.; Roulet, V.; Lucat, P.; Levy, D. [Electricite de France, La Defense (France)

    1997-12-31

    Among the new Clean Coal Technologies, `Circulating Fluidized Bed, is one of the most promising. The interest of this technology has been confirmed by the success of the first large French CFB boiler (E. Huchet 125 MWe), which has already logged more than 30 000 hours of satisfactory operation. Today, the first 250 MWe CFB unit in the world is in operation at Provence Power Station in the south of France. At such a size, the CFB technique has now reached a capacity corresponding to thermal power plants operated by utilities. This new unit, with a `pant leg` design, is also a very important step towards larger sizes, i.e. 400 MWe and bigger. The purpose of the Provence project was to replace the existing pulverised coal boiler unit 4, commissioned in 1967, of the Provence/Gardanne power plant, with a new CFB boiler while reusing most of the existing equipment. The new boiler was ordered from GEC ALSTHOM Stein Industrie by Electricite de France (EDF) on behalf of the SOPROLIF consortium. The 250 MWe Boiler is of the high pressure-reheat type firing local high-sulfur sub-bituminous coal with the possibility of cofiring high viscosity residual oil (with a high sulfur content) up to a 50%-50% energy ratio. This paper describes, besides the construction progress of the plant and technical details of the new boiler and auxiliaries, the main observations made during commissioning. Also presented are some results of a 100% load test and the investigation program defined to give a thorough evaluation of this boiler with a view to the design of large CFB in the future.

  4. Feasibility Study for Operable Unit 7-13/14

    K. Jean Holdren

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  5. Feasibility Study for Operable Unit 7-13/14

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision

  6. Article separation apparatus and method for unit operations

    Pardini, Allan F.; Gervais, Kevin L.; Mathews, Royce A.; Hockey, Ronald L.

    2010-06-22

    An apparatus and method are disclosed for separating articles from a group of articles. The apparatus includes a container for containing one or more articles coupled to a suitable fluidizer for suspending articles within the container and transporting articles to an induction tube. A portal in the induction tube introduces articles singly into the induction tube. A vacuum pulls articles through the induction tube separating the articles from the group of articles in the container. The apparatus and method can be combined with one or more unit operations or modules, e.g., for inspecting articles, assessing quality of articles, or ascertaining material properties and/or parameters of articles, including layers thereof.

  7. Operational benchmark for VVER-1000 Kozloduy NPP unit 6

    Benchmark calculations have been carried out using the 3 D nodal code TRAPEZ. The neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and component descriptions, as well as material compositions, are given. The results presented in the, paper include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overloaded assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. Thus the information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of WWERs. i (authors)

  8. 100 Area Source Operable Unit focused feasibility study. Volume 2

    This 100-KR-1 Operable Unit Focused Feasibility Study (FFS) is prepared in support of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) process for the 100 Areas. This 100-KR-1 FFS, evaluates the remedial alternatives for interim action at high-priority waste sites within the 100-KR-1 Operable Unit, and provides the information needed for the timely selection of the most appropriate interim action at each waste site. The FFS process for the 100 Areas is conducted in two stages: an evaluation of remedial alternatives for waste-site groups and an evaluation of the remedial alternatives for individual waste sites. Whenever the characteristics of the individual waste-sites are sufficiently similar to the characteristics of the waste-site groups, the evaluation of alternatives in the Process Document is used. This approach, referred to as the ''plug-in'' approach, is used because there are many waste sites within the 100 Areas that are similar to each other

  9. The operating experience for Wolsung Unit 3 commissioning

    This is a slide-based oral presentation given to the COG/IAEA: Fifth technical committee meeting on 'Exchange of operating experience of pressurized heavy water reactors' held in Mangalia, Romania on 7-10 September 1998. Since energization of Wolsung Unit 3 station service transformer on July 12, 1996 a line of initial test program was conducted as follows: 1. ILRT/SIT; 2. Pre-operational and Hot Functional testing with a Light Water and without Fuel in Systems; 3. Load D2O in Moderator System; 4. Initial fuel loading; 5. Load D2O in PHT System; 6. Hot Functional Testing with Heavy Water and Fuel in Systems; 7. Criticality and Low Power Physics Testing; 8. Power Ascension Test and, then finally, phase-D test; the plant acceptance test was accomplished after having a Mini-Overhaul to prepare for Commercial Operation. These documents contain not only both overall introduction of commissioning and the first TBN rolling and Synchronization test performed in Hot Function Test, but also presentation of precautions taken against unexpected trip during commissioning. These refer to: 1. Functional Test on the Major Equipments'; 2. Improvement of prevention related to Rx Trip Occurrence During Low Power Operation; Paint Removal in the Turbine's and Cross Around Pipes'; Equipment Improvement About Feed WTR HTR Box-Up; Improvement of Level Control of Deaerator; A thorough Check-out of Main Transformer. The content of the document is the following: A. General; B. Prerequisition condition for test; C. Interruption condition for test; D. Performance of TBN rolling; E. Major operating parameter during test; F. Significant deficiencies and remedial actions during test; G. Effects. In conclusion, the overall commissioning test plan of Wolsung NPP Unit 3 was carried out well without any significant accident or trouble concerning plant safety. These relatively good results might not be acquired without constant efforts of concerned parties including field check out, test and safety

  10. Applied Meteorology Unit - Operational Contributions to Spaceport Canaveral

    Bauman, William H., III; Roeder, William P.; Lafosse, Richard A.; Sharp, David W.; Merceret, Francis J.

    2004-01-01

    The Applied Meteorology Unit (AMU) provides technology development, evaluation and transition services to improve operational weather support to the Space Shuttle and the National Space Program. It is established under a Memorandum of Understanding among NASA, the Air Force and the National .Weather Service (NWS). The AMU is funded and managed by NASA and operated by ENSCO, Inc. through a competitively awarded NASA contract. The primary customers are the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS), FL; the Spaceflight Meteorology Group (SMG) at Johnson Space Center (JSC) in Houston, TX; and the NWS office in Melbourne, FL (NWS MLB). This paper will briefly review the AMU's history and describe the three processes through which its work is assigned. Since its inception in 1991 the AMU has completed 72 projects, all of which are listed at the end of this paper. At least one project that highlights each of the three tasking processes will be briefly reviewed. Some of the projects that have been especially beneficial to the space program will also be discussed in more detail, as will projects that developed significant new techniques or science in applied meteorology.

  11. Enhanced Teaching and Student Learning through a Simulator-Based Course in Chemical Unit Operations Design

    Ghasem, Nayef

    2016-01-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes…

  12. Integrated production and utility system approach for optimizing industrial unit operations

    AGHA, Mujtaba; Thery, Raphaële; Hétreux, Gilles; Haït, Alain; Le Lann, Jean-Marc

    2010-01-01

    To meet utility demands some industrial units use onsite utility system. Traditionally, the management of such type of industrial units is carried out in three sequential steps: scheduling of the manufacturing unit by minimizing inventory, estimating the utility needs of manufacturing unit and finally operation planning of the utility system. This article demonstrates the value of an integrated approach which couples the scheduling of manufacturing unit with operational planning of the utilit...

  13. Operator Strategy for Cold Overpressure Mitigation during SBLOCA for Kori Units 3 and 4 and Ygn Units 1 and 2

    This paper performed analysis to develop the operator response guideline when a primary small bore loss of coolant accident (SBLOCA) in shutdown operation occurs. Break is isolated early since operator recognizes that drain line is opened inadvertently. However, safety injection continues during a fifteen minute since operator action is taken inadequately. Reactor coolant system (RCS) experiences a cold overpressure. A cold overpressure mitigation system (COMS) is actuated normally. On this paper, operator response guideline for the phenomena has been developed based on best estimate analyses for Kori Units 3 and 4 and Ygn Units 1 and 2 power uprate

  14. Varying duty operation of air-cooled condenser units

    Milman, O. O.; Kondratev, A. V.; Ptakhin, A. V.; Dunaev, S. N.; Kirjukhin, A. V.

    2016-05-01

    Results of experimental investigations of operation modes of air-cooled condensers (ACC) under design and varying duty conditions are presented. ACCs with varying cooling airflow rates under constant heat load and with constant cooling airflow under varying heat load are examined. Diagrams of heat transfer coefficients and condensation pressures on the heat load and cooling airflow are obtained. It is found that, if the relative heat load is in the range from 0.6 to 1.0 of the nominal value, the ACC heat transfer coefficient varies insignificantly, unlike that of the water-cooled surface condensers. The results of the determination of "zero points" are given, i.e., the attainable pressure in air-cooled condensing units (ACCU), if there is no heat load for several values of working water temperature at the input of water-jet ejectors and liquid ring vacuum pump. The results of the experimental determination of atmospheric air suction into the ACC vacuum system. The effect of additional air suctions in the steam pipe on ACCU characteristics is analyzed. The thermal mapping of ACC heat exchange surfaces from the cooling air inlet is carried out. The dependence of the inefficient heat exchange zone on the additional air suction into the ACC vacuum system is given. It is shown that, if there is no additional air suction into the ACC vacuum system, the inefficient heat exchange zone is not located at the bottom of the first pass tubes, and their portion adjacent to the bottom steam pipe works efficiently. Design procedures for the ACC varying duty of capacitors are presented, and their adequacy for the ACCU varying duty estimation is analyzed.

  15. FOCU:S--future operator control unit: soldier

    O'Brien, Barry J.; Karan, Cem; Young, Stuart H.

    2009-05-01

    The U.S. Army Research Laboratory's (ARL) Computational and Information Sciences Directorate (CISD) has long been involved in autonomous asset control, specifically as it relates to small robots. Over the past year, CISD has been making strides in the implementation of three areas of small robot autonomy, namely platform autonomy, Soldier-robot interface, and tactical behaviors. It is CISD's belief that these three areas must be considered as a whole in order to provide Soldiers with useful capabilities. In addressing the Soldier-robot interface aspect, CISD has begun development on a unique dismounted controller called the Future Operator Control Unit: Soldier (FOCU:S) that is based on an Apple iPod Touch. The iPod Touch's small form factor, unique touch-screen input device, and the presence of general purpose computing applications such as a web browser combine to give this device the potential to be a disruptive technology. Setting CISD's implementation apart from other similar iPod or iPhone-based devices is the ARL software that allows multiple robotic platforms to be controlled from a single OCU. The FOCU:S uses the same Agile Computing Infrastructure (ACI) that all other assets in the ARL robotic control system use, enabling automated asset discovery on any type of network. Further, a custom ad hoc routing implementation allows the FOCU:S to communicate with the ARL ad hoc communications system and enables it to extend the range of the network. This paper will briefly describe the current robotic control architecture employed by ARL and provide short descriptions of existing capabilities. Further, the paper will discuss FOCU:S specific software developed for the iPod Touch, including unique capabilities enabled by the device's unique hardware.

  16. Verification of SAPFIR95andRC code package against operational data of WWER units

    The previous report on the same subject represents a brief description of procedure laid down in the code package SAPFIR 95 and RC and gives calculation results of fuel cycles by operational data of WWER-440 power Units (Kola NPP, Unit No.1 and Dukovany NPP, Unit No.2). The given paper additionally represents simulation results of fuel cycles as compared with operational data of Dukovany NPP, Unit No.3 and power Units with WWER-1000 reactors (Volgodon NPP, Unit No.1, Kalinin NPP, Unit No.3) (Authors)

  17. Unit information system operational displays for VVER-1000 reactors

    The role of high level operational displays is explained as well as the principles of the design of such displays. The tasks of WWER operating personnel are described and the support provided by operational displays is highlighted. The architecture of the displays is also dealt with. (A.K.)

  18. Impact of wind power on the unit commitment and power system operations

    Kiviluoma, Juha; Holttinen, Hannele [VTT Technical Research Center of Finland (Finland); O' Malley, Mark; Tuohy, Aidan [Univ. College Dublin (Ireland). School of Electrical, Electronic and Mechanical Engineering; Milligan, Michael [National Renewable Energy Laboratory, Golden, CO (United States); Lange, Bernhard [Fraunhofer Institut fuer Windenergie und Energiesystemtechnik (IWES), Kassel (Germany); Gibescu, Madeleine [Delft Univ. of Technology (Netherlands). Dept. of Electrical Sustainable Energy; Meibom, Peter [Risoe National Lab., Roskilde (Denmark). Intelligent Energy Systems Programme; Vigueras-Rodriguez, Antonio; Gomez-Lazaro, Emilio [Castilla-La Mancha Univ. (Spain). Renewable Energy Research Inst.

    2010-07-01

    The article reviews the new requirements variable and partly unpredictable wind power could bring to unit commitment and power system operations. Current practice is shortly described and contrasted against the new requirements. Literature specifically addressing questions about wind power and unit commitment related power system operations is reviewed. Analyzed issues include forecast errors, dispatch, operating reserves, intra-day unit commitments, and sharing reserves across interconnections. Discussion highlights the most important issues and gaps in the current knowledge. (orig.)

  19. 100-BC-5 operable unit focused feasibility study report. Draft A

    This focused feasibility study report presents the detailed analysis of alternatives for both interim remedial measures and potential future actions for the 100-BC-5 operable Unit. The limited investigation recommended that the operable unit be removed from the IRM pathway as defined in the Hanford Past-Practice Strategy. The FFS was initiated in support of a final action. In the course of evaluating alternatives, it was recognized that the data were insufficient to support a final action. Consequently, the unit managers decided to complete the document as an interim FFS to document the modeling and evaluation efforts done to date. The potential contaminant of interest in the operable unit for a final action would be Sr-90, with a calculated incremental cancer risk of 2E-06 based on an occasional-use exposure scenario and which exceeds the Safe Drinking Water Act maximum contaminant level in the near-river wells. The modeling to support the evaluation of alternatives was based on Sr-90 data from groundwater monitoring wells in the operable unit. The 100-BC-5 unit is one of three operable units associated with the 100 B/C Area of the site. Two of the 100 B/C operable units are source units. The 100-BC-5 Groundwater Operable Unit includes the groundwater beneath the source operable units and the adjacent groundwater, surface water, fluvial sediments, and aquatic biota impacted by the overlying source operable unit. The key assumptions which form the basis for the FFS are: addressing an identified threat to human health or the environment; protecting the Columbia River and to abate offsite migration of contaminants; containment and control of contaminant plumes; occasional-use scenario is assumed for the operable unit; a finite lifecycle for the IRM to the year 2008; the 100 Area Feasibility Study Phases I ampersand 2 forms the basis for the alternatives evaluated in the FFS; disposal to the Environment Restoration Disposal Facility is assumed for all solid wastes

  20. Operational test procedure for SY tank farm replacement exhauster unit

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly

  1. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy's (DOE's) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement

  2. Phase I remedial investigation report for the 300-FF-5 operable unit, Volume 1

    NONE

    1994-01-01

    The focus of this remedial investigation (RI) is the 300-FF-5 operable unit, one of five operable units associated with the 300 Area aggregate of the U.S. Department of Energy`s (DOE`s) Hanford Site. The 300-FF-5 operable unit is a groundwater operable unit beneath the 300-FF-1, 300-FF-2, and 300-FF-3 source operable units. This operable unit was designated to include all contamination detected in the groundwater and sediments below the water table that emanates from the 300-FF-1, 300-FF-2, and 300-FF-3 operable units (DOE-RL 1990a). In November 1989, the U.S. Environmental Protection Agency (EPA) placed the 300 Area on the National Priorities List (NPL) contained within Appendix B of the National Oil and Hazardous Substance Pollution Contingency Plan (NCP, 53 FR 51391 et seq.). The EPA took this action pursuant to their authority under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA, 42 USC 9601 et seq.). The DOE Richland Operations Office (DOE-RL), the EPA and Washington Department of Ecology (Ecology) issued the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), in May 1989 (Ecology et al. 1992, Rev. 2). This agreement, among other matters, governs all CERCLA efforts at the Hanford Site. In June 1990, a remedial investigation/feasibility study (RI/FS) workplan for the 300-FF-5 operable unit was issued pursuant to the Tri-Party Agreement.

  3. Brunswick Steam Electric Plant, Units 1 and 2. Annual operating report for 1976

    Net electrical energy generated by Unit 1 was 30,399 MWH with the generator on line 334.5 hrs. Unit 2 generated 2,481,014 MWH with the generator on line 4,915.53 hrs. Information is presented concerning operations, shutdowns and power reductions, maintenance, power generation, modifications, changes to operational procedures, radiation exposures, and leak rate testing

  4. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  5. Price Competition between Road Side Units Operators in Vehicular Networks

    FUX, Vladimir; Maillé, Patrick; Cesana, Matteo

    2013-01-01

    Vehicular networks, besides supporting safety- oriented applications, are nowadays expected to provide effec- tive communication infrastructure also for supporting leisure- oriented application including content sharing, gaming and In- ternet access on the move. This work focuses on Vehicle to Infras- tructure (V2I) scenarios, where multiple content providers own a physical infrastructure of Road Side Units (RSUs) which they use to sell contents to moving vehicles. Content provider/RSU owners...

  6. Peacekeeping and U.N. operational control: a study of their effect on unit cohesion

    Cunningham, Ernest G.

    1995-01-01

    Unit cohesion, the human element in combat, is critical to a unit's ability to survive and conduct successful warfare. Several factors can degrade unit cohesion and subsequently, combat effectiveness. This study concentrates on two such factors, U.S./U.N. operational control and operations other than war (OOTW). A survey was conducted on 300 U.S. Marine Corps soldiers. The results revealed that non-traditional missions were acceptable to a majority of the soldiers if these missions were condu...

  7. Efficiency and productivity in the operational units of the armed forces

    Hanson, Torbjørn

    2012-01-01

    Most nations spend a considerable part of their gross domestic product (GDP) on defense. However, no previous study has addressed the productivity and efficiency of the core area of the armed forces, operational units, using Data Envelopment Analysis (DEA). Introducing a model for the production process of an operational unit, productivity and efficiency are estimated by DEA for units of one branch of the Norwegian armed forces. Small samples are a characteristic of DEA studies in the militar...

  8. Brunswick Steam Electric Plant, Unit 2. Annual operating report, 1975

    Initial criticality occurred in March and start-up testing continued for most of the year. Information is presented concerning operations, shutdowns, maintenance, design changes, personnel radiation exposures, thermal transients, safety/relief valve malfunctions, condenser tube leaks, and recirculation pump seal failures

  9. Parallel Operation Characteristics Analysis of Sewage Source Heat Pump Units in Winter

    庄兆意; 张承虎; 王海燕; 孙德兴

    2010-01-01

    Sewage source heat pump unit operates under partial load most of the time, and study on the law of coefficient of performance (COP) of the unit varying with load ratio can provide basis for the heat pump units running in high efficiency. A mathematical model determining COP, evaporation temperature and condensation temperature of a single unit was proposed. Under the condition of uniform load distribution, the model was established according to different ways of bearing partial load with the same type multi...

  10. Cognitive model of the power unit operator activity

    Basic notions making it possible to study and simulate the peculiarities of man-operator activity, in particular his way of thiking, are considered. Special attention is paid to cognitive models based on concept of decisive role of knowledge (its acquisition, storage and application) in the man mental processes and activity. The models are based on three basic notions, which are the professional world image, activity strategy and spontaneous decisions

  11. Biota of the 300-FF-1 operable unit. [Westinghouse Hanford Company

    Rickard, W.H. Jr.; Fitzner, R.E.; Brandt, C.A.

    1990-10-01

    This report summarizes Task 5a-2 of the Phase I Remedial Investigation -- Operable Unit Characterization of the 300-FF-1 Operable Unit on the Hanford Site, near Richland, Washington. The ultimate goal of Phase I is to determine the nature and extent of the threat to public health and the environment from releases of hazardous substances from the operable unit. The purpose of Task 5a-2 was to determine what species inhabit the 300-FF-1 Operable Unit and how they use the unit. The focus is on those species listed as endangered or threatened, those that are economically important, or those that constitute significant components of the human food chain. 39 refs., 5 figs., 5 tabs.

  12. Design of system for support of decision making by nuclear unit operator

    The diagnostic system is designed for determining the most probable causes of failures of a nuclear power unit, including those caused by positive reactivity changes, loss-of-coolant accidents, and heat removal system failures. The system algorithm operates in cycles of three steps, viz.: (1) simulation of nuclear unit operation using a mathematical model of the unit and simulated input values; (2) comparison of time courses of simulated and measured technological parameters based on the evaluation of the square of their deviations; (3) optimal adjustment of values using a suitable optimization method. A system of this type can be applied in two operating situations: in support of the operator's intervention in the control functions of the automated process control system aiming at preventing accident unit shutdown, and in a quick determination of the cause of an accident unit shutdown. In testing, the time of analysis of causes was about 10 to 20 s. (J.B.). 1 fig

  13. Operation of the radioactive acid-digestion test unit (RADTU)

    At the Karlsruhe Nuclear Research Center, research and development work concerned with the acid digestion of combustible waste with high plutonium content is being carried out. The main objectives are the reduction of the waste volume, the recovery of the plutonium and the transformation of the process residues into a product suitable for final disposal. For this purpose an inactive demonstration plant with a throughput of 1.5 kg/h has been constructed. In the first version, the reactor of this plant was a tray reactor of the HEDL type. During test operations the sedimentation of a residue was observed on the tray. The density of this residue was higher than that of the residue suspended in the reaction acid. Experiments using tantalum oxide (D=8.4 g/cm3) to simulate the plutonium oxide (D=11.5 g/cm3) have verified this observation. This means that in active operation a sedimentation of plutonium oxide on the tray is to be expected. With respect to these results a new reactor was developed where the settling of the residue is avoided by appropriate design and high circulation velocity of the reaction acid. The reactor consists of a tube 50-80 mm in diameter, which is curved to form a closed loop with an arm length of about 1x1 m. Since October 1979 this ring reactor has been under inactive test operation. Its behaviour is very stable. The velocity of the reaction acid in the heater is 0.5-1 m/s. A settling of residues or tantalum oxide has not been observed. The throughput attained is comparable to that of the tray reactor but the space requirement is three times smaller, and the volume of the reaction acid four times smaller. (author)

  14. 14 CFR 375.41 - Agricultural and industrial operations within the United States.

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agricultural and industrial operations... Agricultural and industrial operations within the United States. Foreign civil aircraft shall not be used for such commercial air operations as crop dusting, pest control, pipeline patrol, mapping,...

  15. Systems for training and supporting the level of unit operator's skill

    Power unit operator's activity and the flowsheets of his contacts are considered. Different systems of personnel training: standard, conceptional and two-stage complex system of education and training are analyzed. The necessity to organize training centers including the full-scale trainer, the monitoring system of current phsicho-physiological operator's characteristics and the monitoring system of operator errors are proved

  16. Preparation status for continuous operation of Kori unit 1 NPP in Korea

    Kori unit 1 Nuclear Power Plant is the first commercial operation plant in Korea. In Korea, the life extension of NPP beyond design lifetime reached practically application stage. Preparations status for continuous operation of Kori unit 1, Many researches have demonstrated that life extension beyond design lifetime is possible in terms of technology. This paper is to introduce and to share the continuous operation preparations status and schedule for Kori unit 1 License Renewal Process an additional every 10 years beyond the design life 30 years term. (author)

  17. Operational Optimization of Large-Scale Parallel-Unit SWRO Desalination Plant Using Differential Evolution Algorithm

    Jian Wang; Xiaolong Wang; Aipeng Jiang; Shu Jiangzhou; Ping Li

    2014-01-01

    A large-scale parallel-unit seawater reverse osmosis desalination plant contains many reverse osmosis (RO) units. If the operating conditions change, these RO units will not work at the optimal design points which are computed before the plant is built. The operational optimization problem (OOP) of the plant is to find out a scheduling of operation to minimize the total running cost when the change happens. In this paper, the OOP is modelled as a mixed-integer nonlinear programming problem. A...

  18. Operational optimization of large-scale parallel-unit SWRO desalination plant using differential evolution algorithm.

    Wang, Jian; Wang, Xiaolong; Jiang, Aipeng; Jiangzhou, Shu; Li, Ping

    2014-01-01

    A large-scale parallel-unit seawater reverse osmosis desalination plant contains many reverse osmosis (RO) units. If the operating conditions change, these RO units will not work at the optimal design points which are computed before the plant is built. The operational optimization problem (OOP) of the plant is to find out a scheduling of operation to minimize the total running cost when the change happens. In this paper, the OOP is modelled as a mixed-integer nonlinear programming problem. A two-stage differential evolution algorithm is proposed to solve this OOP. Experimental results show that the proposed method is satisfactory in solution quality. PMID:24701180

  19. Operational Optimization of Large-Scale Parallel-Unit SWRO Desalination Plant Using Differential Evolution Algorithm

    Wang, Xiaolong; Jiang, Aipeng; Jiangzhou, Shu; Li, Ping

    2014-01-01

    A large-scale parallel-unit seawater reverse osmosis desalination plant contains many reverse osmosis (RO) units. If the operating conditions change, these RO units will not work at the optimal design points which are computed before the plant is built. The operational optimization problem (OOP) of the plant is to find out a scheduling of operation to minimize the total running cost when the change happens. In this paper, the OOP is modelled as a mixed-integer nonlinear programming problem. A two-stage differential evolution algorithm is proposed to solve this OOP. Experimental results show that the proposed method is satisfactory in solution quality. PMID:24701180

  20. Operational Optimization of Large-Scale Parallel-Unit SWRO Desalination Plant Using Differential Evolution Algorithm

    Jian Wang

    2014-01-01

    Full Text Available A large-scale parallel-unit seawater reverse osmosis desalination plant contains many reverse osmosis (RO units. If the operating conditions change, these RO units will not work at the optimal design points which are computed before the plant is built. The operational optimization problem (OOP of the plant is to find out a scheduling of operation to minimize the total running cost when the change happens. In this paper, the OOP is modelled as a mixed-integer nonlinear programming problem. A two-stage differential evolution algorithm is proposed to solve this OOP. Experimental results show that the proposed method is satisfactory in solution quality.

  1. A comparison of operational risk in banks of United Kingdom and China

    JIANG, KAITIAN

    2014-01-01

    This dissertation mainly compares the operational risk in banks of the United Kingdom (UK hereafter) and China by measuring the operational risk and estimating the firm-specific and macroeconomic determinants of operational risk in both the UK and China separately. Four main findings are concluded from the comparison of operational risk in banks of the UK and China. It suggests that larger banks with better profitability, less solvency risk, less growth opportunity, better efficiency and grea...

  2. Operation of EMEP 'supersites' in the United Kingdom. Annual report for 2007

    J. N. Cape; Bealey, W; M. Coyle; Di Marco, C.; Kentisbeer, J.; Leaver, D.; Malcolm, H.; E. Nemitz; Simmons, I.; Twigg, M.; van Dijk, van Dijk

    2009-01-01

    As part of its commitment to the UN-ECE Convention on Long-range Transboundary Air Pollution the United Kingdom will operate two ‘supersites’ reporting data to the Co-operative Programme for Monitoring and Evaluation of the Long-range Transmission of Air Pollutants in Europe (EMEP). This report provides the annual summary for 2007, the first full calendar year of operation of the first EMEP ‘supersite’ to be established in the United Kingdom. Detailed operational reports have been submitte...

  3. Operation of EMEP 'supersites' in the United Kingdom. Annual report for 2006

    J. N. Cape; Bealey, W; M. Coyle; Di Marco, C.; Kentisbeer, J.; Leaver, D.; Malcolm, H.; E. Nemitz; Simmons, I.; Twigg, M.; van Dijk, N

    2009-01-01

    As part of its commitment to the UN-ECE Convention on Long-range Transboundary Air Pollution the United Kingdom will operate two ‘supersites’ reporting data to the Co-operative Programme for Monitoring and Evaluation of the Long-range Transmission of Air Pollutants in Europe (EMEP). This report provides the annual summary for 2006, the first calendar year of operation of the first EMEP ‘supersite’ to be established in the United Kingdom. Detailed operational reports have been submitted to ...

  4. Operation of EMEP ‘supersites’ in the United Kingdom. Annual report for 2008.

    J. N. Cape; Bealey, W; M. Coyle; Di Marco, C.; Kentisbeer, J.; Leaver, D.; Malcolm, H.; E. Nemitz; Simmons, I.; Twigg, M.; van Dijk, N

    2010-01-01

    As part of its commitment to the UN-ECE Convention on Long-range Transboundary Air Pollution the United Kingdom operates two ‘supersites’ reporting data to the Co-operative Programme for Monitoring and Evaluation of the Long-range Transmission of Air Pollutants in Europe (EMEP). This report provides the annual summary for 2008, the second full calendar year of operation of the first EMEP ‘supersite’ to be established in the United Kingdom. Detailed operational reports have been submitted...

  5. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  6. The Design, Testing and Operation of the IUE Data Processing Unit Power Supply

    Gillis, J. A., Jr.

    1974-01-01

    The design and operation is reported of the power supply for the IUE data processing unit. Design specifications are presented along with performance data and parts selection. Illustrations show the completed circuit with and without its covers.

  7. 78 FR 39018 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3

    2013-06-28

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3 AGENCY: Nuclear Regulatory Commission. ACTION: Supplement to Final Supplement 38 to the Generic...

  8. Radon dosimetry in the operational units of the 'Sanpaolo IMI' Italian banking group

    This document sets out the activities relating to information organization and risk assessment for the management of the dosimeters labelling, data collection for information storage measured data in the operational units of the Italian banking group 'Sanpaolo IMI'

  9. Proposed plan for remedial action at the quarry residuals operable unit of the Weldon Spring Site

    This proposed plan addresses the management of contamination present in various components of the quarry residuals operable unit (QROU) of the Weldon Spring site, which is located in St. Charles County, Missouri. The QROU consists of (1) residual waste at the quarry proper; (2) the Femme Osage Slough, Little Femme Osage Creek, and Femme Osage Creek; and (3) quarry groundwater located primarily north of the slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of the evaluations for this operable unit. Remedial activities for the QROU will be conducted by the US Department of Energy (DOE) in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of the remedial investigation/feasibility study (RI/FS) process required for the QROU under CERCLA, three major evaluation documents have been prepared to support cleanup decisions for this operable unit. decisions for this operable unit

  10. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  11. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  12. Psychophysiological maintaining power unit operators reliability in the nuclear power industry

    The research center of nuclear power industry analyzed the causes of failures in power unit operation connected with the errors made by operators. In normal function of NPP operation readings of the devices change slowly and the units operation is steady. It creates monotonous actions and leads to the loss of vigilance. But at the same time a unit operator is in the state of operation waiting which leads to psychological tenacity. Each moment an operator must imagine how the power unit works and he must be ready to operate the unit quickly. For safety operation of NPP it's necessary to select people who have some professional qualities and who will be able to acquire knowledge at the appointed time. The operator's motivation is of great importance: if he wants to work at a NPP and why: if he is interested in successful work; if he is indifferent to his work or not. The negative factors that influence successful work are as follows: low ability for logical analyses expressed yearning for domination, to become a leader, to produce favorable impression by all means, including lie; disability to eject factors, causing alarm and long emotional experience. We have watched this kind of operators could do anything in critical situation low level of activity and mood special individual approach to the situation, when a person is guided only by himself without due regard to other people. Additional clinical psychodiagnostic methods are implemented after making primary psychodiagnostics to persons who have some signs of supposed mental health defects. Near 3 thousand operators have been tested at the Psychological Service at the STC. The results were: 7% of the pretenders did not meet the requirements, they have not been accepted to work in NPPs. The experts did not recommend to employ 16% of the pretenders or it's necessary to control their work carefully. 77% of the pretenders have been recommended to operational work

  13. Economic Assessment of Unified Power Quality Controller Operation in Joint and Separated Modes with DG Units

    Y. Hoseynpoor; T. Pirzadeh Ashraf; Sh. Sajedi

    2011-01-01

    This study evaluates the joint operation of the unified power quality conditioner (UPQC) and distributed generation system with there separated operation and compares these modes from economic point of view. The investigated joint system consists of a series inverter, a shunt inverter, and an DG unit connected in the dc link through a rectifier. The separated system consists of a separate UPQC and DG unit which is connected to grid through back to back inverters. The investment cost of joint ...

  14. Agglomeration and Spatial Dependence in Certified Organic Operations in the United States

    Marasteanu, I. Julia; Jaenicke, Edward C.

    2013-01-01

    The purpose of this paper to provide added insight into clustering as it pertains to the United States organic sector. I identify clusters of United States certified organic operations by showing how a formal definition of spatial clusters can emerge from an estimated model that accounts for spatial dependency. I also analyze how county-level variables impact the distribution of certified organic operations while controlling for spatial autocorrelation. My results indicate that the spatial di...

  15. Dresden Nuclear Power Station, Units 1, 2, and 3. Annual operating report: January thru December 1976

    Net electrical energy generated by Unit 1 was 953,015.5 MWH with the generator on line 7,399.37 hrs. Unit 2 generated 4,371,553.689 MWH with the generator on line 6,664.58 hrs while Unit 3 generated 4,034,251 MWH with the generator on line 7,234.86 hrs. Information is presented concerning operations, maintenance, and shutdowns

  16. Point Beach Nuclear Plant, Units 1 and 2. Annual operating report: January--December 1976

    Unit 1 generated 227,877 MWH with the generator on-line 540 hrs and Unit 2 generated 324,954 MWH with the generator on-line 696 hrs. Information is presented concerning operating experience; procedure changes, tests, and experiments; maintenance, licensee event reports and other events of interest; data tabulations of electric power generation, unit shutdowns, forced power reductions, and number of personnel and Man/Rem exposure; eddy current testing of steam generator tubes; and fuel history

  17. Quad-Cities Station, Units 1 and 2. Semiannual operating report, January--June 1975

    Unit 1 generated 2,024,125 net electrical MWH and the generator was on line 3162.6 hours. Unit 2 generated 746,184 net electrical MWH and was on line 1475.3 hrs. Data is included concerning operations, power generation, shutdowns, maintenance, changes, and tests. (FS)

  18. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772)

  19. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).

  20. Decommissioning strategy of the operating WWER type units in the Ukraine

    At present in Ukraine, 13 WWER type units are in operation and two other ones are in the final stage of construction. Decommissioning of these units is expected after the year 2010. General planning of their decommissioning is developed in the framework of the decommissioning strategy of operating WWER type units. The strategy contains the objectives, principles and main tasks of the decommissioning as well as the activities at each phase of decommissioning. It is considered a broad range of factors important for the planning and implementation of decommissioning. (author)

  1. OPERATING OF MOBILE MACHINE UNITS SYSTEM USING THE MODEL OF MULTICOMPONENT COMPLEX MOVEMENT

    Lebedev, A.; N. Artiomov; M. Shulyak; M. Podrigalo; D. Abramov; D. Klets; R. Kaidalov

    2015-01-01

    To solve the problems of mobile machine units system operating it is proposed using complex multi-component (composite) movement physical models. Implementation of the proposed method is possible by creating of automatic operating systems of fuel supply to the engines using linear accelerometers. Some examples to illustrate the proposed method are offered.

  2. Oconee Nuclear Station, Units 1, 2, and 3. Semiannual operating report, January--June 1975

    Information is presented concerning operations, performance characteristics, changes, tests, inspections, containment leak tests, maintenance, primary coolant chemistry, station staff changes, reservoir investigations, plume mapping, and operational environmental radioactivity monitoring data for oconee Units 1, 2, and 3. The non-radiological environmental surveillance program is also described. (FS)

  3. Small Hankel Operators on the Dirichlet-Type Spaces on the Unit Ball of Cn

    Peng Yan HU; Wen Jun ZHANG

    2004-01-01

    In this paper the small Hankel operators on the Dirichlet-type spacesDp on the unit ball of Gn are considered. A similar result to that ofthe one-dimensional setting is given, which characterizes the boundedness of the small Hankel operators on Dp.

  4. Economic Assessment of Unified Power Quality Controller Operation in Joint and Separated Modes with DG Units

    Y. Hoseynpoor

    2011-09-01

    Full Text Available This study evaluates the joint operation of the unified power quality conditioner (UPQC and distributed generation system with there separated operation and compares these modes from economic point of view. The investigated joint system consists of a series inverter, a shunt inverter, and an DG unit connected in the dc link through a rectifier. The separated system consists of a separate UPQC and DG unit which is connected to grid through back to back inverters. The investment cost of joint system is compared with investment cost of separate use of UPQC and DG unit and the economic saving due to use of coupled system is estimated. The DG unit is assumed a wind energy conversion system (WECS in this study. The analysis shows that joint operation of UPQC with WECS is significantly economical.

  5. Analysis of long-time operation of micro-cogeneration unit with fuel cell

    Patsch Marek

    2015-01-01

    Full Text Available Micro-cogeneration is cogeneration with small performance, with maximal electric power up to 50 kWe. On the present, there are available small micro-cogeneration units with small electric performance, about 1 kWe, which are usable also in single family houses or flats. These micro-cogeneration units operate on principle of conventional combustion engine, Stirling engine, steam engine or fuel cell. Micro-cogeneration units with fuel cells are new progressive developing type of units for single family houses. Fuel cell is electrochemical device which by oxidation-reduction reaction turn directly chemical energy of fuel to electric power, secondary products are pure water and thermal energy. The aim of paper is measuring and evaluation of operation parameters of micro-cogeneration unit with fuel cell which uses natural gas as a fuel.

  6. Indian Point Station, Units 1, 2, and 3. Annual operating report for 1976

    Unit 1 remained in a shutdown condition pending a decision by the Company on the installation of an ECCS as required by NRC. Net electrical power generated by Unit 2 was 2,267,654 MWH with the unit on line 3,056.45 hrs. Unit 3 generated 1,872,947 MWH and was on line 2,286.01 hrs. Information is presented concerning operations, reportable events, corrective maintenance, fuel performance, radioactivity releases, shutdowns, primary coolant chemistry, and occupational radiation exposures

  7. Results of toxicity tests and chemical analyses conducted on sediments collected from the TNX Outfall Delta Operable Unit, July 1999

    Specht, W.L.

    2000-02-11

    In order to provide unit specific toxicity data that will be used to address critical uncertainty in the ecological risk assessment (ERA) for the TNX Outfall Delta Operable Unit (TNXOD OU), sediments were collected from eight locations in the Inner Swamp portion of the operable unit and two unit specific background locations. These samples were analyzed for total mercury, total uranium, and sediment toxicity.

  8. Evaluation of a Multiple-Effect Distillation Unit under Partial Load Operating Conditions

    2013-01-01

    The design of a multiple-effect distillation (MED) system is presented, and the results for partial load operation of a single-effect distillation unit are presented. The MED is designed to be driven by solar energy, and thus the dynamic performance and partial load operation production are of interest. Two operating modes are considered in the analysis, with and without the use of a flow distributor. Various tests were performed varying the heating steam flow rate and the intake seawater flo...

  9. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  10. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992

  11. Fiscal Year 1997 Annual Report for the 100-NR-2, 200-UP-1, and 200-ZP-1 Pump and Treat Operations and Operable Units

    The Environmental Restoration Contractor (ERC), Bechtel Hanford, Inc., conducts groundwater remediation activities across the Hanford Site for the U.S. Department of Energy. Operable units, as defined under CERCLA, have been established to address groundwater contamination issues in various areas of the Site. Groundwater within these operable units has been contaminated by a variety of chemical and radiological constituents associated with past-practices liquid effluent disposal, as well as accidental leaks and spills. The ERC is currently operating three pump-and-treat systems in the 100 Area: Strontium-90 is being addressed in the 100-NR-2 Operable Unit, while hexavalent chromium is being addressed in the 100-KR-4 and 100-HR-3 Operable Units. In the 200 Area, technetium-99, uranium, carbon tetrachloride, and nitrate are being addressed in the 200-UP-1 Operable Unit, while carbon tetrachloride, trichloroethene, and chloroform are being addressed in the 200-ZP-1 Operable Unit

  12. The Applied Meteorology Unit: Nineteen Years Successfully Transitioning Research Into Operations for America's Space Program

    Madura, John T.; Bauman, William H., III; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.

    2011-01-01

    The Applied Meteorology Unit (AMU) provides technology development and transition services to improve operational weather support to America's space program . The AMU was founded in 1991 and operates under a triagency Memorandum of Understanding (MOU) between the National Aeronautics and Space Administration (NASA), the United States Air Force (USAF) and the National Weather Service (NWS) (Ernst and Merceret, 1995). It is colocated with the 45th Weather Squadron (45WS) at Cape Canaveral Air Force Station (CCAFS) and funded by the Space Shuttle Program . Its primary customers are the 45WS, the Spaceflight Meteorology Group (SMG) operated for NASA by the NWS at the Johnson Space Center (JSC) in Houston, TX, and the NWS forecast office in Melbourne, FL (MLB). The gap between research and operations is well known. All too frequently, the process of transitioning research to operations fails for various reasons. The mission of the AMU is in essence to bridge this gap for America's space program.

  13. An Optimal Design of Crude Distillation Unit Part 2. Optimal Operating Conditions

    Seo, Jung Won; Kim, Suk Joon; Kim, Kyung Hyun; Lee, Tae Hee [Department of Chemical Engineering, Yonsei University, Seoul (Korea); Oh, Min [Department of Chemical Engineering, Hanbat National University, Taejon (Korea)

    2001-02-01

    This paper considers the optimal operating conditions to minimize the annual capital and operating cost of a crude distillation unit, which consumes enormous energy. Reflecting on the complexity of intervention and interconnection among each unit, optimization task was carried out for the whole crude distillation unit including preheat train, atmospheric/vacuum distillation column, light naphtha stabilizer, etc. Optimization results were compared with those from commercial plant of which capacity is 150,000 BPSD. >From this comparison, we can save 20,000,000 Kcal/h in the optimal case. It is also concluded that annual capital and operating cost was reduced from 10,649,000 US$/ to 9,185,230 US$/y, which is equivalent to 14% cost saving. 22 refs., 6 figs., 5 tabs.

  14. Compex system for teaching and training operators for TPP and NPP power units

    Requirements, taken as a principle for constructing the system for operator teaching and training (OTT), have been formulated on the basis of investigation of operators' work at TPP and NPP power units. Functional structure and a structural block-diagram for OTT are built. As a criterion, which determines the structure of any trainers, being a part of OTT a requirement has been chosen satisfying the correspondence beetween habits developed with the help of trainers and habits of real operators' work. Results of analysis permit to confirm that refusal or under statement of the role of any stage of operator training leads to reduction of quality of his training

  15. Ergonomic aspects of design of operators' workplaces in unit control room

    A project was designed of reconstruction of the power unit control room with the objective of optimizing the relation man-position-working conditions and of improving the operator's reliability. The project was based on an analysis of the operators' jobs and an analysis of the current control room equipment. The results of the analyses point to high psychological demands put on the operators' job, unsuitable location of workplaces in the control room, subjective feelings of fatigue of the operators, unsuitable illumination, etc. (J.B.)

  16. Design and operational parameters of transportable supercritical water oxidation waste destruction unit

    Supercritical water oxidation (SCWO) is the destruction of hazardous waste by oxidation in the presence of water at temperatures and pressures above its critical point. A 1 gal/h SCWO waste destruction unit (WDU) has been designed, built, and operated at Los Alamos National Laboratory. This unit is transportable and is intended to demonstrate the SCWO technology on wastes at Department of Energy sites. This report describes the design of the WDU and the preliminary testing phase leading to demonstration

  17. Turkey Point Plant, Units 3 and 4. Semiannual operating report No. 7, July--December 1975

    Unit 3 generated 1,968,074 MWh(e) net electric power and the generator was on line 2,802.9 hrs. Unit 4 generated 2,560,476 MWh(e) and was on line 3,944.8 hrs. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, radioactive effluent releases, radiological environmental monitoring, and occupational personnel radiation monitoring

  18. Interim action record of decision remedial alternative selection: TNX area groundwater operable unit

    This document presents the selected interim remedial action for the TNX Area Groundwater Operable Unit at the Savannah River Site (SRS), which was developed in accordance with CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of 1986, and to the extent practicable, the National Oil and Hazardous Substances Pollution contingency Plan (NCP). This decision is based on the Administrative Record File for this specific CERCLA unit

  19. Control technique for enhancing the stable operation of distributed generation units within a microgrid

    Highlights: • A control technique for enhancing the stable operation of distributed generation units is proposed. • Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors. • The compensation of instantaneous variations in the reference current components is considered. • Simulation results confirm the performance of the control scheme within the microgrid. - Abstract: This paper describes a control technique for enhancing the stable operation of distributed generation (DG) units based on renewable energy sources, during islanding and grid-connected modes. The Passivity-based control technique is considered to analyze the dynamic and steady-state behaviors of DG units during integration and power sharing with loads and/or power grid, which is an appropriate tool to analyze and define a stable operating condition for DG units in microgrid technology. The compensation of instantaneous variations in the reference current components of DG units in ac-side, and dc-link voltage variations in dc-side of interfaced converters, are considered properly in the control loop of DG units, which is the main contribution and novelty of this control technique over other control strategies. By using the proposed control technique, DG units can provide the continuous injection of active power from DG sources to the local loads and/or utility grid. Moreover, by setting appropriate reference current components in the control loop of DG units, reactive power and harmonic current components of loads can be supplied during the islanding and grid-connected modes with a fast dynamic response. Simulation results confirm the performance of the control scheme within the microgrid during dynamic and steady-state operating conditions

  20. Short-term Operating Strategy with Consideration of Load Forecast and Generating Unit Uncertainty

    Sarjiya; Eua-Arporn, Bundhit; Yokoyama, Akihiko

    One of the common problems faced by many electric utilities concernes with the uncertainty from both load forecast error and generating unit unavailability. This uncertainty might lead to uneconomic operation if it is not managed properly in the planning stage. Utilities may have many operational tools, e.g. unit commitment, economic dispatch. However, they require a proper operating strategy, taking into account uncertainties. This paper explicitly demonstrates how to include the uncertainties to obtain the best operating strategy for any power systems. The uncertainty of the load forecast is handled using decision analysis method, meanwhile the uncertainty of the generating unit is approached by inclusion of risk cost to the total cost. In addition, three spinning reserve strategies based on deterministic criteria are incorporated in the development of scenario. Meanwhile, Mixed Integer Linear Programming method is utilized to generate unit commitment decision in each created scenario. The best strategy which gives the minimum total cost is selected among the developed scenarios. The proposed method has been tested using a modified of IEEE 24-bus system. Sensitivity analysis with respect to the number of unit, expected unserved energy price, standard deviation of load forecast, and probability of load level is reported.

  1. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request

    L. Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  2. Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report

    Lee Davison

    2009-06-30

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

  3. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    Biggerstaff, R.L.

    1994-06-30

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy`s (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment.

  4. Survey Method for Radiological Surveys of 300-FF-1 Operable Unit Soils and Material

    This technical basis is to be used to survey soils at the 300-FF-1 Operable Unit during remediation of the site. Its purpose is to provide a basis for the survey methods to be employed by radiological control technician (RCTs) to guide the excavation effort in accordance with the 300-FF-1 waste site Record of Decision (ROD). The ROD for the 300-FF-1 Operable Unit requires selective excavation, removal, and disposal of contaminated soil above 350 pCi/g total uranium activity. Soil above this level will be disposed of as radioactive waste. The remaining soil will remain onsite

  5. Operable Unit 3-13, Group 3, Other Surface Soils (Phase I) Remedial Action Report

    L. Davison

    2007-07-31

    This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 3, Other Surface Soils, Phase I sites at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The 10 sites addressed in this report were defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for these 10 sites have been accomplished and are hereafter considered No Action or No Further Action sites.

  6. Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08

    M. S. Roddy

    2007-05-01

    This plan describes the groundwater sampling and water level monitoring that will be conducted to evaluate contaminations in the Snake River Plain Aquifer entering and leaving the Idaho National Laboratory. The sampling and monitoring locations were selected to meet the data quality objectives detailed in this plan. Data for the Snake River Plain Aquifer obtained under this plan will be evaluated in the Operable Unit 10-08 Remedial Investigation/Feasibility Study report and will be used to support the Operable Unit 10-08 Sitewide groundwater model.

  7. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  8. Qualitative risk assessment for the 100-KR-4 groundwater operable unit

    This report provides the qualitative risk assessment (QRA) for the 100-KR-4 groundwater operable unit at the US Department of Energy's (DOE) Hanford Site in southeastern Washington State. The extent of the groundwater beneath the 100 K Area is defined in the Remedial Investigation/Feasibility Study Work Plan for the 100-KR-4 Operable Unit (DOE-RL 1992a). The QRA is an evaluation or risk using a limited amount of data and a predefined set of human and environmental exposure scenarios and is not intended to replace or be a substitute for a baseline risk assessment

  9. Phase 1 remedial investigation report for 200-BP-1 operable unit. Volume 1

    1993-09-01

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit.

  10. Phase 1 remedial investigation report for 200-BP-1 operable unit

    The US Department of Energy (DOE) Hanford Site, in Washington State is organized into numerically designated operational areas including the 100, 200, 300, 400, 600, and 1100 Areas. The US Environmental Protection Agency (EPA), in November 1989 included the 200 Areas of the Hanford Site on the National Priority List (NPL) under the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). Inclusion on the NPL initiated the remedial investigation (RD process for the 200-BP-1 operable unit. These efforts are being addressed through the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989) which was negotiated and approved by the DOE, the EPA, and the State of Washington Department of Ecology (Ecology) in May 1989. This agreement, known as the Tri-Party Agreement, governs all CERCLA efforts at Hanford. In March of 1990, the Department of Energy, Richland Operations (DOE-RL) issued a Remedial Investigation/Feasibility Study (RI/FS) work plan (DOE-RL 1990a) for the 200-BP-1 operable unit. The work plan initiated the first phase of site characterization activities associated with the 200-BP-1 operable unit. The purpose of the 200-BP-1 operable unit RI is to gather and develop the necessary information to adequately understand the risks to human health and the environment posed by the site and to support the development and analysis of remedial alternatives during the FS. The RI analysis will, in turn, be used by Tri-Party Agreement signatories to make a risk-management-based selection of remedies for the releases of hazardous substances that have occurred from the 200-BP-1 operable unit

  11. Structural characterization and condition for measurement statistics preservation of a unital quantum operation

    Lee, Kai-Yan; Fung, Chi-Hang Fred; Chau, H. F.

    2013-05-01

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation ϕ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with ϕ, we can completely characterize the kinds of quantum states that are fixed by ϕ. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states—a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for determining what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of Størmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on a finite-dimensional quantum state.

  12. Structural characterization and condition for measurement statistics preservation of a unital quantum operation

    We investigate the necessary and sufficient condition for a convex cone of positive semidefinite operators to be fixed by a unital quantum operation ϕ acting on finite-dimensional quantum states. By reducing this problem to the problem of simultaneous diagonalization of the Kraus operators associated with ϕ, we can completely characterize the kinds of quantum states that are fixed by ϕ. Our work has several applications. It gives a simple proof of the structural characterization of a unital quantum operation that acts on finite-dimensional quantum states—a result not explicitly mentioned in earlier studies. It also provides a necessary and sufficient condition for determining what kind of measurement statistics is preserved by a unital quantum operation. Finally, our result clarifies and extends the work of Størmer by giving a proof of a reduction theorem on the unassisted and entanglement-assisted classical capacities, coherent information, and minimal output Renyi entropy of a unital channel acting on a finite-dimensional quantum state. (paper)

  13. NUMATH: a nuclear-material-holdup estimator for unit operations and chemical processes

    A computer program, NUMATH (Nuclear Material Holdup Estimator), has been developed to estimate compositions of materials in vessels involved in unit operations and chemical processes. This program has been implemented in a remotely operated nuclear fuel processing plant. NUMATH provides estimates of the steady-state composition of materials residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimations, the results are determined for the cataloged in container-oriented files. The estimated compositions represent materials collected in applicable vessels - including consideration for materials previously acknowledged in these vessels. The program utilizes process measurements and simple performance models to estimate material holdup and distribution within unit operations. In simulated run-testing, NUMATH typically produced estimates within 5% of the measured inventories for uranium and within 8% of the measured inventories for thorium during steady-state process operation

  14. Evaluation of the contract management process in the United Nations for acquiring peacekeeping operations/services

    Shameem, Mohammad

    2007-01-01

    Over the years, the United Nations' (UN) peacekeeping operations have increased significantly. When a crisis develops in any part of the world, the UN is expected to respond. It examines the overall situation in order to assess the political and military goals, required composition of force, equipment, training, financial implications, circumstances of deployment and effectiveness of the peacekeeping operation required. The UN does not have any permanent force structure; it is dependent on it...

  15. A Mathematical Model and Its Application for Hydro Power Units under Different Operating Conditions

    Yang, Weijia; Yang, Jiandong; Guo, Wencheng; Zeng, Wei; Wang, Chao; Saarinen, Linn; Norrlund, Per

    2015-01-01

    This paper presents a mathematical model of hydro power units, especially the governor system model for different operating conditions, based on the basic version of the software TOPSYS. The mathematical model consists of eight turbine equations, one generator equation, and one governor equation, which are solved for ten unknown variables. The generator and governor equations, which are different under various operating conditions, are presented and discussed in detail. All the essential non-...

  16. Operating characteristics and efficiencies of an active chilled beam terminal unit under variable air volume mode

    Appropriately designing and maintaining temperature and relative humidity in a given space is essential for active chilled beam systems, where condensation should be strictly prevented. As a consequence, the Total Cooling Output Capacity (TCOC) of an active chilled beam system should be matched with the total cooling load of the applied space, as well as the Sensible Heat Ratio (SHR) of the system with the SHR of the space. From such a perspective, this paper for the first time explored the operating characteristics of a 2-way discharge active chilled beam terminal unit. Based on an experimentally verified model of the unit, a series of realistic simulations were carried out under various primary air volume flow rates and various chilled water volume flow rates. Inherent correlations between the TCOC and SHR were revealed. In the meanwhile, the operating efficiencies of the unit were also measured by an energy saving potential index ε, which is defined as the ratio of chilled water sensible cooling output capacity to the total sensible cooling output capacity. In addition, influences of different primary air and space conditions on the operating characteristics and efficiencies were studied. The results obtained in this study are expected to facilitate a better understanding of the active chilled beam terminal unit, so as to the designs, the operating principles, and the control strategies of active chilled beam systems for an improved indoor thermal environment. - Highlights: • The operating characteristics and efficiencies of an active chilled beam terminal unit were revealed. • The performance indexes were correlated and mutually constrained with a colorful trapezoid. • The sensitivity of the performance indexes to actual primary air and space conditions were evaluated. • Application range of the active chilled beam terminal unit can be enlarged at a low primary air relative humidity

  17. Post TMI nuclear power plant operator qualification and training practices in the United States

    Nuclear power plant operator qualification and training practices in the United States which have changed or may change as a result of the accident at Three Mile Island are discussed. First, the response of the U.S. Nuclear Regulatory Commission has been to develop a comprehensive plan designed to improve the operational safety of nuclear power facilities. This includes upgrading operator training, operator licensing examinations, shift staffing requirements and operator entry level qualifications. Secondly the U.S. National Voluntary Consensus Standards Response has included revisions of three standards in this area. Thirdly, the Research Response: the U.S. Department of Energy is funding research by the Institute of Nuclear Power Operations (INPO) in the area of operator qualification and training, including job and task analyses for the auxiliary operator, reactor operator, senior reactor operator, shift supervisor and shift technical advisor. Additionally research under the auspices of the USNRC in the areas of job/task analysis, nuclear power plant simulators, and the effects of shift work will be used to help establish optimal qualification and training requirements for nuclear power plant operators. (U.K.)

  18. Liquid phase methanol LaPorte process development unit: Modification, operation, and support studies

    1991-02-02

    This report consists of Detailed Data Acquisition Sheets for Runs E-6 and E-7 for Task 2.2 of the Modification, Operation, and Support Studies of the Liquid Phase Methanol Laporte Process Development Unit. (Task 2.2: Alternate Catalyst Run E-6 and Catalyst Activity Maintenance Run E-7).

  19. 77 FR 40091 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating, Units 2 and 3

    2012-07-06

    ... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating, Units 2 and 3 AGENCY: Nuclear... statement for license renewal of nuclear plants; availability. SUMMARY: The U.S. Nuclear...

  20. Hydrologic resources management program and underground test area operable unit fy 1997

    Smith, D. F., LLNL

    1998-05-01

    This report present the results of FY 1997 technical studies conducted by the Lawrence Livermore National Laboratory (LLNL) as part of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area Operable Unit (UGTA). The HRMP is sponsored by the US Department of Energy to assess the environmental (radiochemical and hydrologic) consequences of underground nuclear weapons testing at the Nevada Test Site.

  1. Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    This document provides the Environmental Restoration Program with information about the erosion and sediment control, storm water management, maintenance, and reporting and record keeping practices to be employed during Phase II of the remediation project for the Lower East Fork Poplar Creek (LEFPC) Operable Unit

  2. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  3. Limited field investigation report for the 100-DR-1 Operable Unit

    1994-06-01

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km{sup 2} (0.59 mi{sup 2}) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation.

  4. Use of the LITEE Lorn Manufacturing Case Study in a Senior Chemical Engineering Unit Operations Laboratory

    Abraham, Nithin Susan; Abulencia, James Patrick

    2011-01-01

    This study focuses on the effectiveness of incorporating the Laboratory for Innovative Technology and Engineering Education (LITEE) Lorn Manufacturing case into a senior level chemical engineering unit operations course at Manhattan College. The purpose of using the case study is to demonstrate the relevance of ethics to chemical engineering…

  5. A Moveable Feast--A Progressive Approach to the Unit Operations Laboratory

    Conner, Wm. Curtis, Jr.; Hammond, Karl D.; Laurence, Robert L.

    2011-01-01

    The authors describe an alternative format for the senior laboratory in which students are allowed--indeed, expected--to communicate with previous groups and build on their results. The effect is a unit operations laboratory in which students are empowered to propose the experiments they wish to do and in which the cumulative experience of the…

  6. China's first large-scale MA production unit operational in Shanxi

    2008-01-01

    @@ Abrainchild of researchers of the CAS Institute of Coal Chemistry, a production unit capable of turning out 20,000 tons of maleic anhydride (MA) per year, the largest of its kind in China, has come into operation recently at the Shanxi Regent Taiming Chemical Co Ltd in Taiyuan, capital of north China's Shanxi Province.

  7. 27 CFR 28.58 - Operations or unit bond-distilled spirits.

    2010-04-01

    ...-distilled spirits. 28.58 Section 28.58 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND... § 28.58 Operations or unit bond—distilled spirits. (a) Spirits. Where spirits are withdrawn without payment of tax, as authorized in § 28.91, from the bonded premises of a distilled spirits plant...

  8. Limited field investigation report for the 100-DR-1 Operable Unit

    This limited field investigation (LFI) report summarizes the data collection and analysis activities conducted during the 100-DR-1 Source Operable Unite LFI and the associated qualitative risk assessment (QRA), and makes recommendations on the continued candidacy of high-priority sites for interim remedial measures (IRM). The results and recommendations presented in this report are generally independent of future land use scenarios. The 100-DR-1 Operable Unit is one of four operable units associated with the 100 D/DR Area at the Hanford Site. The 100-DR-1 Operable Unit encompasses approximately 1.5 km2 (0.59 mi2) and is located immediately adjacent to the Columbia River shoreline. In general, it contains waste facilities associated with the original plant facilities constructed to support D Reactor facilities, as well as cooling water retention basin systems for both D and DR Reactors. The 100-DR-1 LFI began the investigative phase of the remedial investigation for a select number of high-priority sites. The LFI was performed to provide additional data needed to support selection, design and implementation of IRM, if needed. The LFI included data compilation, nonintrusive investigations, intrusive investigations, summarization of 100 Area aggregate studies, and data evaluation

  9. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    Vukelich, S.E. [Golder Associates, Inc., Richland, WA (United States)

    1994-09-22

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River.

  10. Qualitative risk assessment for the 100-HR-3 groundwater operable unit

    This report provides the qualitative risk assessment for the 100-HR-3 operable unit on the Hanford Reservation. 100-HR-3 is a ground water unit. The purpose of the QRA at the 100-HR-3 operable unit is to focus on a predefined set of human and environmental exposure scenarios in order to provides sufficient information that will assist the Tri-Party signatories (Washington State Department of Ecology, EPA and US DOE) in making defensible decisions on the necessity of Interim Remedial Measures. Frequent- and occasional-use exposure scenarios are evaluated in the human health risk assessment to provide bounding estimates of risk. The ecological risk assessment consists of an evaluation of the risks to riparian and aquatic receptors which live in or near the Columbia River

  11. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  12. Mortality on grower/finisher-only swine operations in the United States

    Losinger W.C.; Bush E.J.; Smith M.A.; Corso B.A.

    1999-01-01

    For 53 grower/finisher-only swine operations that participated in the United States National Animal Health Monitoring System 1995 National Swine Study, mortality among finisher pigs ranged from 0 to 12.0% over a 6-month period. Twenty-six (49.1%) had 2% mortality. Nine (17.0%) operations experienced >4% mortality. Fisher's exact test revealed that operations with all-in all-out management were significantly more likely to have 900 pigs entered the grower/finisher phase) practiced all-in, all-...

  13. Limited field investigation report for the 100-HR-3 operable unit

    This limited field investigation (LFI) was conducted to assess the applicability of interim remedial measures (IRM) for reducing human health and environmental risks within the 100-HR-3 Groundwater Operable Unit. The 100-HR-3 Operable Unit is comprised of three subareas; the 100 D Area, the 100 H Area and those portions of the 600 Area between the two reactor areas. The operable unit is one of seven operable units associated with the 100 D and H Areas. Operable units 100-DR-1, 100-DR-2, 100-DR-3, 100-HR-1, 100-HR-2 and 100-IU-4 address contaminant sources while 100-HR-3 addresses contamination present in the underlying groundwater. The primary method of field investigation used during this LFI was the installation and sampling of monitoring wells. Samples were collected from the groundwater and soils, and submitted for laboratory analysis. Boreholes were surveyed for radiological contamination using downhole geophysical techniques to further delineate the locations and levels of contaminants. All samples were screened to ascertain the presence of volatile organic compounds and radionuclides. Analytical data were subjected to validation; all round one, two and three and a minimum of 10% of round four data associated with the LFI were validated. A screening method was used to identify contaminants of potential concern (COPC). This screening method eliminated from further consideration, constituents that were below background. Constituents which are considered non-toxic to humans were eliminated from the human health evaluation. Data consistency and blank contamination were also evaluated in the screening process. These COPC were then evaluated further in the qualitative risk assessment (QRA). A human health QRA was performed using conservative (maximum equilibrated contaminant levels from the LFI) analyses

  14. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  15. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99Tc and 60Co for underwater affected by past discharges to the 216-BY Cribs, and 90Sr, 239/240Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  16. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    Mellor, S.P.; Matthee, F.W. [ESKOM, Koeberg Nuclear Power Station (South Africa)

    2002-07-01

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  17. Level 1 shutdown and low power operation of Mochovce NPP, Unit 1, Slovakia

    The paper presents general approach, used methods and form of documentation of the results that have been applied within the shutdown and low power PSA (SPSA) study for Mochovce NPP, Unit 1, Slovakia. The SPSA project was realized by VUJE Trnava Inc., Slovakia in 2001-2002 years. The Level 1 SPSA study for Mochovce NPP Unit 1 covers internal events as well as internal (fires, floods and heavy load drop) and external (aircraft crash, extreme meteorological conditions, seismic event and influence of surrounding industry) hazards. Mochovce NPP consists of two operating units equipped with VVER 440/V213 reactors safety upgraded before construction finishing and operation start. 87 safety measures based on VVER 440 operational experience and international mission insights were implemented to enhance its operational and nuclear safety. The SPSA relates to full power PSA (FPSA) as a continuation of the effort to create a harmonized level 1 PSA model for all operational modes of the plant with the goal to use it for further purposes as follows: Real Time Risk Monitor, Maintenance Optimization, Technical Specifications Optimization, Living PSA. (author)

  18. Operating experience with the WWER-440/W 230 reactor units of the Greifswald nuclear power station

    After seventeen years of operation, almost to the day, unit 1 of the Greifswald nuclear power station was shut down in December 1990 as the last of the units still in operation. This step completed the decommissioning of all units as ordered by the authorities. The use of nuclear power for energy generation in the eastern part of Germany, which began when the Rheinsberg nuclear power station was commissioned in 1966, has thus been brought to a temporary end. The Greifswald (4x440 MW) and Rheinsberg (70 MW) nuclear power stations covered an annual average of 10 to 12% of the electricity requirement of the GDR in the past ten years, thus contributing to a stable energy supply over a prolonged period of time. For security reasons of the then GDR government there was hardly any possibility to report about the performance and operating records of the plants in former years. The 1990 press reports consequently were bound to create the impression as if these reactor plants had not been very successful and had been operated at high risk. In order to put these impressions on a more objective base, this report presents important findings made during the operation of the Greifswald nuclear power station and evaluates them. (orig.)

  19. Operating experience gained during the copper oxide plugging incident in Koeberg unit 1 generator stator

    In June 1999 Koeberg's unit 1 started to experience adverse operating conditions which were later ascribed to blockages in the hollow conductors of the generator stator. These blockages were attributed to copper oxide plugs which developed progressively during the following year and culminated in reduced power operation. Many attempts were made to address the plugging by implementing various off-line and on-line cleaning processes. Subsequent to a successful on-line cleaning operation, the unit was returned to full power and the chemistry regime for the stator cooling water system was changed to allow for operation at an elevated pH. This paper discusses Koeberg's experience with copper oxide blockages, describes the initial indications of the problem and the impact on the operating parameters. The remainder of the paper focuses on the actions taken to address the deteriorating situation and the different cleaning methods implemented to remove the copper oxide deposits. The paper concludes with the current status of the unit 1 generator stator and the lessons learned during the resolution of this problem. (authors)

  20. [Operational Management of Multidisciplinary Organ-Based Tumor Units in Our Cancer Center].

    Kato, Hiroaki; Tsujie, Masanori; Ichimura, Noriko; Yukawa, Masao; Inoue, Masatoshi

    2016-05-01

    Owing to the advances in diagnosis and treatment, it is imperative to develop a multidisciplinary approach for the management of cancer patients. In our cancer center, multidisciplinary organ-based tumor units have been organized for team medical care. These units consist of cancer specialists from multiple departments including medical oncology, surgery, radiology, histopathology, and nursing. Members of each unit regularly conduct meetings to discuss diagnostic and therapeutic aspects, as well as to report the progress of cancer patients. Co-operation with the counseling and support center, utilization of the computerized medical record system, and using brochures for advertisement, all play important roles in adequate management of multidisciplinary organ-based tumor units. PMID:27210090

  1. Soil washing physical separations test procedure - 300-FF-1 operable unit

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The open-quotes Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,close quotes Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the open-quotes 300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,close quotes (DOE-RL 1993)

  2. Soil washing physical separations test procedure - 300-FF-1 operable unit

    Belden, R.D.

    1993-10-08

    This procedure provides the operations approach, a field sampling plan, and laboratory procedures for a soil washing test to be conducted by Alternative Remedial Technologies, Inc. (ART) in the 300-FF-1 area at the Hanford site. The {open_quotes}Quality Assurance Project Plan for the Soil Washing Physical Separations Test, 300-FF-1 Operable Unit,{close_quotes} Hanford, Washington, Alternative Remedial Technologies, Inc., February 1994 (QAPP) is provided in a separate document that presents the procedural and organizational guidelines for this test. This document describes specifications, responsibilities, and general procedures to be followed to conduct physical separation soil treatability tests in the North Process Pond of the 300-FF-1 Operable Unit (OU) at the Hanford Site. These procedures are based on the {open_quotes}300-FF-1 Physical Separations CERCLA Treatability Test Plan, DOE/RL 92-2l,{close_quotes} (DOE-RL 1993).

  3. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  4. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  5. Point Beach Nuclear Plant, Units 1 and 2. Semiannual operating report No. 10, January--June 1975

    Unit 1 operated at an average capacity factor of 65.2 percent with a net efficiency of 31.41 percent. Unit 2 operted at an average capacity factor of 88.6 lpercent with a net efficiency of 32.28 percent. Unit 1 was essentially base loaded while Unit 2 operated on load follow. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  6. Optimal coordinate operation control for wind–photovoltaic–battery storage power-generation units

    Highlights: • Adopt ‘rainflow’ calculation method to establish the battery cycle life model and quantitatively calculate the life wreck. • Minimize unit cost of power generation through enhanced gravitational search algorithm. • Analyze the relationship between renewable resource potential and the economic efficiency of power generation unit. - Abstract: An optimal coordinate operation control method for large-scale wind–photovoltaic (PV)–battery storage power generation units (WPB-PGUs) connected to a power grid with rated power output was proposed to address the challenges of poor stability, lack of decision-making, and low economic benefits. The “rainflow” calculation method was adopted to establish the battery cycle life model and to calculate quantitatively the life expectancy loss in the operation process. To minimize unit cost of power generation, this work optimized the output period of the equipment and strategy of battery charging and discharging with consideration of working conditions, generation equipment characteristics, and load demand by using the enhanced gravitational search algorithm (EGSA). A case study was conducted on the basis of data obtained using WPB-PGU in Zhangbei, China. Results showed that the proposed method could effectively minimize the unit cost of a WPB-PGU under different scenarios and diverse meteorological conditions. The proposed algorithm has high calculation accuracy and fast convergence speed

  7. Operating and reconstruction experience of the drum-separators of the Kursk NPP unit 1

    The reason for increased humidity at the drum-separator outlet is determined analyzing separation tests and data on the power unit equipment operation. It is shown that hydrovalve breakup at the outlet of the submerged punched sheet was the source of the high steam humidity. Recommendations on the hydrovalve reconstruction and separation test results after the reconstruction are presented. The separated steam humidity does not exceed 0.02% by the mass at the nominal unit parameters at 52 mm height of the hydrovalve outlet gap

  8. Qualitative risk assessment for the 100-FR-1 source operable unit

    This report provides the Qualitative risk assessment (QRA) for the waste sites associated with the 100-FR-1 Operable Unit. The QRA is an evaluation of risk for a predefined set of human and ecological exposure scenarios. It is not intended to replace or be a substitute for a baseline risk assessment. The QRA is streamlined to consider only two human health scenarios (frequent-and occasional-use) with four exposure pathways (soil ingestion, fugitive dust inhalation, inhalation of volatile organics, and external radiation exposure) and a limited ecological evaluation. The use of these scenarios and pathways was agreed to by the 100 Area Tri-Party unit managers

  9. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    Kashiwazaki-Kariwa Nuclear Power Station Units Nos. 6 and 7, the world's first ABWRs (Advanced Boiling Water Reactor), started commercial operation on November 7, 1996 and July 2, 1997, respectively, and continued their commercial operation with a high capacity factor, low occupational radiation exposure and radioactive waste. Units 6 and 7 were in their 3rd cycle operation until 25th April 1999 and 1st November 1999, respectively. Thermal efficiency was 35.4-35.8% (design thermal efficiency: 34.5%) during these period, demonstrating better performance than that of BWR-5 (design thermal efficiency: 33.4%). Nos. 6 and 7 have experienced 2 annual outages. The first outage of unit No. 6 started on November 20, 1997 and was completed within 61 days (including 6 New Year holidays), and the second outage started on March 13, 1999 and was completed within 44 days. The first annual outage of unit No. 7 started on May 27, 1998, earlier than it would normally have been, to avoid an annual outage during the summer, and was completed within 55 days, and the second outage started on September 18th, 1999 and was completed within 45 days, All annual outages were carried out within a very short time period without any severe malfunctions, including newly designed ABWR systems and equipment. As the first outage in Japan, 55 days is a very short period, despite the fact that the Nos. 6 and 7 are the first ABWRs in the world and the largest capacity units in Japan. The total occupational radiation exposure of No. 6 was 300 man-mSv (1st outage) and 331 man-mSv (2nd outage). That of Unit 7 was 153 man-mSv (1st outage) Those of unit No. 6 were at the same level as those of unit No. 3, which is the latest design 1100MW(e) BWR-5. That of unit No. 7 was the lowest ever at Kashiwazaki-Kariwa nuclear power station. The drums of radioactive waste discharged during the annual outage numbered 54 (1st outage) for No. 6 and 62 (1st outage) for No. 7, which was less than the design target of 100

  10. An Automatic Uav Mapping System for Supporting un (united Nations) Field Operations

    Choi, K.; Cheon, J. W.; Kim, H. Y.; Lee, I.

    2016-06-01

    The United Nations (UN) has performed field operations worldwide such as peacekeeping or rescue missions. When such an operation is needed, the UN dispatches an operation team usually with a GIS (Geographic Information System) customized to a specific operation. The base maps for the GIS are generated mostly with satellite images which may not retain a high resolution and the current situation. To build an up-to-date high resolution map, we propose a UAV (unmanned aerial vehicle) based automatic mapping system, which can operate in a fully automatic way from the data acquisition of sensory data to the data processing for the generation of the geospatial products such as a mosaicked orthoimage of a target area. In this study, we analyse the requirements for UN field operations, suggest a UAV mapping system with an operation scenario, and investigate the applicability of the system. With the proposed system, we can construct a tailored GIS with up-to-date and high resolution base maps for a specific operation efficiently.

  11. An analysis of post-traumatic stress symptoms in United States Air Force drone operators.

    Chappelle, Wayne; Goodman, Tanya; Reardon, Laura; Thompson, William

    2014-06-01

    Remotely piloted aircraft (RPA), commonly referred to as "drones," have emerged over the past decade as an innovative warfighting tool. Given there is a paucity of empirical research assessing drone operators, the purpose of this study was to assess for the prevalence of PTSD symptoms among this cohort. Of the 1084 United States Air Force (USAF) drone operators that participated, a total of 4.3% endorsed a pattern of symptoms of moderate to extreme level of severity meeting criteria outlined in the Diagnostic and Statistical Manual of Mental Disorders-4th edition. The incidence of PTSD among USAF drone operators in this study was lower than rates of PTSD (10-18%) among military personnel returning from deployment but higher than incidence rates (less than 1%) of USAF drone operators reported in electronic medical records. Although low PTSD rates may be promising, limitations to this study are discussed. PMID:24907535

  12. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  13. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  14. Development of Regulatory Audit Programs for Wolsong Unit 1 Continued Operation

    Wolsong Unit 1 (PHWR type) design life expires on November 20, 2010. In relation to it, KHNP submitted its application to get approval of the MEST on December 30, 2009 and KINS is under review to confirm the appropriateness of continued operation. For the comprehensive review of Wolsong Unit 1 continued operation, KINS has developed the review guidelines for PHWR type reactor including a total of 39 aging management program (AMP) items and 7 time limited aging analysis (TLAA) items. Evaluations or calculations to verify the integrity of nuclear components are required for plant specific AMP and TLAA items as well as the ones specified in the guidelines. In this paper, audit calculation programs developed for KINS staff use in reviewing applicant's submitted evaluation results are presented

  15. Steam generator tube integrity requirements and operating experience in the United States

    Steam generator tube integrity is important to the safe operation of pressurized-water reactors. For ensuring tube integrity, the U.S. Nuclear Regulatory Commission uses a regulatory framework that is largely performance based. This performance-based framework is supplemented with some prescriptive requirements. The framework recognizes that there are three combinations of tube materials and heat treatments currently used in the United States and that the operating experience depends, in part, on the type of material used. This paper summarizes the regulatory framework for ensuring steam generator tube integrity, it highlights the current status of steam generators, and it highlights some of the steam generator issues and challenges that exist in the United States. (author)

  16. Screening of Potential Remediation Methods for the 200-BP-5 Operable Unit at the Hanford Site

    Truex, Michael J.; Dresel, P. EVAN; Nimmons, Michael J.; Johnson, Christian D.

    2006-09-21

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-BP-5 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final (EPA 1988). The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers) identified in the groundwater sampling and analysis plan for the operable unit (DOE/RL-2001-49, Rev. 1) with additions.

  17. Start up and commercial operation of Laguna Verde nuclear power plant. Unit 1

    Prior to start up of Laguna Verde nuclear power plant preoperational tests and start tests were performed and they are described in its more eminent aspects. In relation to commercial operation of nuclear station a series of indicator were set to which allow the measurement of performance in unit 1, in areas of plant efficiency and personal safety. Antecedents. Laguna Verde station is located in Alto Lucero municipality in Veracruz state, 70 kilometers north-northeast from port of Veracruz and a 290 kilometers east-northeast from Mexico city. The station consist of two units manufactured by General Electric, with a nuclear system of vapor supply also called boiling water (BWR/5), and with a system turbine-generator manufactured by Mitsubishi. Each unit has a nominal power of 1931 MWt and a level design power of 675 Mwe and a net power of 654 Electric Megawatts

  18. 200-ZP-1 operable unit borehole summary report for FY 1995 and FY 1996

    This document details the well construction, sampling, analyses, and geologic character of the Ringold Formation fluvial unit E gravels as encountered in 16 boreholes in the 200-ZP-1 Operable Unit. These boreholes were drilled by Water Development Hanford Corporation during fiscal years 1995 and 1996. Two of the sixteen boreholes were abandoned; the remaining 14 boreholes were completed as functioning production and compliance wells. The borehole logs and well summary sheets included as Appendices A and B of this document, respectively, depict and describe the vadose zone stratigraphic units encountered during the course of drilling. Appendix C contains the results of sieve analyses conducted on samples obtained via resonant sonic coring and standard split-spoon methods. The sieve analyses were the driver behind the majority of the well designs. Also, for completeness, Appendices D and E contain the well design calculations and the well development process

  19. Summary of remedial investigations at the 307 retention basins and 307 trenches (316-3), 300-FF-2 Operable Unit

    Remedial investigations at the 307 retention basins and 307 trenches (316-3) in the 300 Area of the Hanford Site were conducted as part of the 300-FF-1 operable unit Phase 1 remedial investigation (RI) in accordance with the approved RI work plan. During the RI, the southwestern boundary of the 300-FF-1 operable unit was modified by all signatories to the Hanford Federal Facility Agreement and Consent Order, which shifted the 307 retention basins and 307 trenches to the 300-FF-3 operable unit. As a consequence, the RI results from these waste management units were not included in the Phase 1 Remedial Investigation Report for the 300-FF-1 Operable Unit. As a results of recent Hanford Federal Facility Agreement and Consent Order negotiations, the 300-FF-2 operable unit now consists of the remaining 300 Area operable units within the 300 Area National Priorities List (NPL), which includes the former 300-FF-3 operable unit. Therefore, this document summarizes the RI results from the 307 retention basins and 307 trenches in the 300-FF-2 operable unit. Analysis and evaluation of these results well be included in the 300-FF-2 RI report

  20. Data validation report for the 100-KR-4 operable unit first quarter, 1994

    Samples were obtained from the 100-KR-4 Operable Unit first Quarter 1994 Groundwater Sampling event. The data from the chemical analysis of fifty-eight samples from this sampling event and their related quality assurance samples were reviewed and validated to verify that reported samples results were of sufficient quality to support decisions regarding remedial actions performed at this site. Information fro the sampling event and the information validation processes are presented in this document

  1. Hill Air Force Base, Utah, Final Record of Decision and Responsiveness Summary for Operable Unit 2

    Ogden ALC

    1997-01-01

    This decision document presents the selected remedy for Operable Unit 2 (OU2) at Hill Air Force Base (HAFB), Utah. It was selected in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This decision is based on the Administrative Record for this site. Th...

  2. Discrete Sampling Test Plan for the 200-BP-5 Operable Unit

    Sweeney, Mark D.

    2010-02-04

    The Discrete Groundwater Sampling Project is conducted by the Pacific Northwest National Laboratory (PNNL) on behalf of CH2M HILL Plateau Remediation Company. The project is focused on delivering groundwater samples from proscribed horizons within select groundwater wells residing in the 200-BP-5 Operable Unit (200-BP-5 OU) on the Hanford Site. This document provides the scope, schedule, methodology, and other details of the PNNL discrete sampling effort.

  3. Clinical microbiology in the intensive care unit: Strategic and operational characteristics

    Bhattacharya S; Mondal A.

    2010-01-01

    Infection is a major cause of morbidity and mortality among patients admitted in intensive care units (ICUs). The application of the principles and the practice of Clinical Microbiology for ICU patients can significantly improve clinical outcome. The present article is aimed at summarising the strategic and operational characteristics of this unique field where medical microbiology attempts to venture into the domain of direct clinical care of critically ill patients. The close and strategic ...

  4. INEL Operable Unit 7-13 containment and stabilization configuration option

    A containment and stabilization configuration option has been developed for the Idaho National Engineering Laboratory's Subsurface Disposal Area Operable Unit 7-13, the transuranic (TRU)-contaminated waste pits and trenches. The configuration option is presented as an end-to-end system block diagram. Functional subelements are separately discussed, and technical background information, assumptions, input, high-level subelement requirements, and output are presented for each option

  5. Aquatic studies at the 100-HR-3 and 100-NR-1 operable units

    Pacific Northwest Laboratory initiated a program to characterize selected aquatic biological populations to determine (1) existing levels of inorganic chemical and radionuclide contamination, and (2) the populations' suitability as indicators of chemical releases during cleanup activities at the US Department of Energy's Hanford Site. Following work plans for the ground-water operable units, lower trophic levels in the aquatic habitat (periphyton and caddisfly larvae) were evaluated for contaminants at the 100-HR-3 Operable Unit and 100-NR-1 Operable Unit. The results were evaluated to determine the need for further sampling. If the results showed no significant contamination compared to upriver levels, sampling would be discontinued. The periphyton community appears to be suitable for determining contamination levels. Baseline concentrations for stable chromium were established and will be useful for comparing samples collected when contaminant release is expected. Concentrations of 60Co, 90Sr, and 137Cs in periphyton were essentially below detectable limits, which will also make this community useful in detecting potential releases of radionuclides during cleanup activities. Levels for both stable chromium and radionuclides were essentially below detection limits for caddisfly larvae. Thus, these organisms may be used to monitor suspected contaminant releases from cleanup activities; if concentrations exceed detection limits, they may be related to these activities. Two candidate threatened and endangered species of molluscs occur in the Hanford Reach of the Columbia River. These are the shortface lanx (Fisherola nuttalli), which is a Washington State candidate species, and the Columbia pebblesnail (Fluminicola columbiana), which is both a state and federal candidate species. Specimens of the shortface lanx were observed in the vicinity of N Springs (100-NR-1 Operable Unit); they likely occur throughout this area

  6. The new local control systems for operating gaseous diffusion plant units at Pierrelatte

    The development of a local control network for operating gaseous diffusion plant units is presented. The objective of the control system up date was to replace all the information network hardware. The new generation HP1000 calculators and a network architecture were chosen. The validation tests performed in laboratory and in situ, and the management policies towards the personnel during the technical changes are summarized

  7. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  8. Operation and results of the prototype KM3NeT detection unit

    Biagi, Simone

    2016-07-01

    KM3NeT will be a km3-scale neutrino telescope in the Mediterranean Sea. The detector will consist of blocks of about one hundred detection units. Each detection unit will host 18 digital optical modules, connected along a 700 m-long vertical structure. Electro-optical cables allow for data transmission and power supply to the optical modules. The optical module comprises 31 photomultiplier tubes of 3'', instruments to monitor environmental variables and electronic boards to communicate onshore and operate the photomultipliers. A prototype detection unit has been deployed in May 2014 at the KM3NeT-It installation site 80 km SE offshore of Capo Passero, Sicily. This prototype allowed to test the deployment procedures, the mechanics and the electronic of the apparatus, the data taking and analysis procedures. A general description of the detector and some results of the prototype are presented. The first detection unit of the KM3NeT neutrino telescope will be deployed and become operative by the end of 2015.

  9. Enhanced teaching and student learning through a simulator-based course in chemical unit operations design

    Ghasem, Nayef

    2016-07-01

    This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes through simulators. A case study presenting the teaching method was evaluated using student surveys and faculty assessments, which were designed to measure the quality and effectiveness of the teaching method. The results of the questionnaire conclusively demonstrate that this method is an extremely efficient way of teaching a simulator-based course. In addition to that, this teaching method can easily be generalised and used in other courses. A student's final mark is determined by a combination of in-class assessments conducted based on cooperative and peer learning, progress tests and a final exam. Results revealed that peer learning can improve the overall quality of student learning and enhance student understanding.

  10. The prevalence of long QT interval in post-operative intensive care unit patients.

    Pham, Julius Cuong; Banks, Michael C; Narotsky, David L; Dorman, Todd; Winters, Bradford D

    2016-08-01

    The severity of patient illnesses and medication complexity in post-operative critically ill patients increase the risk for a prolonged QT interval. We determined the prevalence of prolonged QTc in surgical intensive care unit (SICU) patients. We performed a prospective cross-sectional study over a 15-month period at a major academic center. SICU pre-admission and admission EKGs, patient demographics, and laboratory values were analyzed. QTc was evaluated as both a continuous and dichotomous outcome (prolonged QTc > 440 ms). 281 patients were included in the study: 92 % (n = 257) post-operative and 8 % (n = 24) non-operative. On pre-admission EKGs, 32 % of the post-operative group and 42 % of the non-operative group had prolonged QTc (p = 0.25); on post-admission EKGs, 67 % of the post-operative group but only 33 % of the non-operative group had prolonged QTc (p experience increases the risk for long QTc. PMID:26169292

  11. A Mathematical Model and Its Application for Hydro Power Units under Different Operating Conditions

    Weijia Yang

    2015-09-01

    Full Text Available This paper presents a mathematical model of hydro power units, especially the governor system model for different operating conditions, based on the basic version of the software TOPSYS. The mathematical model consists of eight turbine equations, one generator equation, and one governor equation, which are solved for ten unknown variables. The generator and governor equations, which are different under various operating conditions, are presented and discussed in detail. All the essential non-linear factors in the governor system (dead-zone, saturation, rate limiting, and backlash are also considered. Case studies are conducted based on one Swedish hydro power plant (HPP and three Chinese plants. The simulation and on-site measurements are compared for start-up, no-load operation, normal operation, and load rejection in different control modes (frequency, opening, and power feedback. The main error in each simulation is also discussed in detail. As a result, the model application is proved trustworthy for simulating different physical quantities of the unit (e.g., guide vane opening, active power, rotation speed, and pressures at volute and draft tube. The model has already been applied effectively in consultant analyses and scientific studies.

  12. Operational Evaluation of VEGGIE Food Production System in the Habitat Demonstration Unit

    Stutte, Gary W.; Newsham, Gerard; Morrow, Robert M.; Wheeler, Raymond M.

    2011-01-01

    The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSan(tm) as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

  13. Operation Evaluation of the VEGGIE Food Production System in the Habitat Demonstration Unit

    Stutte, Gary W.; Newsham, Gerard; Morrow, Robert M.; Wheeler, Raymond M.

    2011-01-01

    The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSantm as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

  14. PREMATH: a Precious-Material Holdup Estimator for unit operations and chemical processes

    A computer program, PREMATH (Precious Material Holdup Estimator), has been developed to permit inventory estimation in vessels involved in unit operations and chemical processes. This program has been implemented in an operating nuclear fuel processing plant. PREMATH's purpose is to provide steady-state composition estimates for material residing in process vessels until representative samples can be obtained and chemical analyses can be performed. Since these compositions are used for inventory estimation, the results are determined for and cataloged in container-oriented files. The estimated compositions represent material collected in applicable vessels - including consideration for material previously acknowledged in these vessels. The program utilizes process measurements and simple material balance models to estimate material holdups and distribution within unit operations. During simulated run testing, PREMATH-estimated inventories typically produced material balances within 7% of the associated measured material balances for uranium and within 16% of the associated, measured material balances for thorium (a less valuable material than uranium) during steady-state process operation

  15. NRC plan for cleanup operations at Three Mile Island Unit 2

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  16. Operation of Beaver Valley Power Station, Unit 2, Docket No. 50-412, Beaver County, Pennsylvania

    The final environmental impact statement (EPA No. 850438F) assesses the effects of operating a pressurized water reactor in Pennsylvania on the south bank of the Ohio River, which would serve as the final heat sink for the cooling system. Operation of Unit 2 would add 836 MW of capacity and increase system reliability. The plant would employ 465 at an $18 million payroll. Facilities for the plant would take up 56 acres of agricultural land. The operation result in both water and noise pollution. There is only a small probability of impacts due to potential radiation exposure. The Federal Water Pollution Control Act of 1972 and Nuclear Regulatory Commission Regulations require the impact statement

  17. International Space Station United States Orbital Segment Oxygen Generation System On-Orbit Operational Experience

    Erickson, Robert J.; Howe, John, Jr.; Kulp, Galen W.; VanKeuren, Steven P.

    2008-01-01

    The International Space Station (ISS) United States Orbital Segment (USOS) Oxygen Generation System (OGS) was originally intended to be installed in ISS Node 3. The OGS rack delivery was accelerated, and it was launched to ISS in July of 2006 and installed in the US Laboratory Module. Various modification kits were installed to provide its interfaces, and the OGS was first activated in July of 2007 for 15 hours, In October of 2007 it was again activated for 76 hours with varied production rates and day/night cycling. Operational time in each instance was limited by the quantity of feedwater in a Payload Water Reservoir (PWR) bag. Feedwater will be provided by PWR bag until the USOS Water Recovery System (WRS) is delivered to SS in fall of 2008. This paper will discuss operating experience and characteristics of the OGS, as well as operational issues and their resolution.

  18. The nuclear industry's transition to risk-informed regulation and operation in the United States

    This paper summarizes a study of the transition of the United States nuclear industry from a prescriptive regulatory structure to a more risk informed approach to operations and regulations. The transition occurred over a 20 yr period in which gradual changes were made in the fundamental regulations and to the approach to nuclear safety and operations. While the number of actual regulatory changes were few, they are continuing. The utilities that embraced risk informed operations made dramatic changes in the way they approached operations and outage management. Those utilities that used risk in operations showed dramatic improvement in safety based on Institute of Nuclear Power Operations (INPO) performance indicators. It was also shown that the use of risk did not negatively affect safety performance of the plants compared to standard prescriptive approaches. This was despite having greater flexibility in compliance to regulatory standards and the use of the newly instituted risk-informed reactor oversight process. Key factors affecting the successful transition to a more risk-informed approach to regulations and operations are: strong top management support and leadership both at the regulator and the utility; education and training in risk principles and probabilistic risk Assessment tools for engineers, operators and maintenance staff; a slow and steady introduction of risk initiatives in areas that can show value to both the regulator and the industry; a transparent regulatory foundation built around a safety goal policy and the development of a strong safety culture at the utility to allow for more independence in safety compliance and risk management. The experience of the United States shows positive results in both safety and economics. The INPO and NRC metrics presented show that the use of risk information in operations and regulation is marginally better with no degradation in safety when plants that have embraced risk-informed approaches are compared

  19. Dresden Nuclear Power Station, Units 1, 2, and 3. Semiannual report on operating and maintenance, July--December 1974

    Unit 1 generated 388,882 MWH(e) and was on line 3111.2 hours, Unit 2 generated 1,204,106 MWH(e) and was on line 2013.4 hours, and Unit 3 generated 2,250,810 MWH(e) and was on line 3836 hours. Information is presented concerning operations, shutdowns, maintenance, changes, tests, and experiments for the three units. (U.S.)

  20. Preliminary importance analysis of safety related motor operated valves for Ulchin units 3 and 4

    We perform an importance analysis of safety related motor operated valves( MOV) for Ulchin Units 3 and 4 from the viewpoint of Probabilistic Safety Assessment (PSA). The safety evaluation of safety related MOV for domestic nuclear power plants affects the experience data used for the quantification of MOV common cause failure (CCF) events in Ulchin Units 3 and 4 PSA. Therefore, in this paper, we re-estimate MGL(multiple greek letter) parameter used for the evaluation of MOV CCF events in Ulchin Units 3 and 4 and perform importance analysis for safety related MOVs. The number of high safety significant components (HSSCs) by the integrated importance analysis using the changed MGL parameter is decreased by 45% compared with that using current MGL parameter in Ulchin Units 3 and 4 PSA. If sensitivity analysis results are incorporated into the integrated importance analysis results, the number of HSSCs by the integrated importance analysis using the changed MGL parameter is decreased by 35% compared with that using the current MGL parameter

  1. Fessenheim 2: ASN's green light for continuing operation - Beginning of the works for unit 1

    Every 10 years a nuclear power plant operator has to make a re-assessment of the nuclear safety standard of his plant. This re-assessment is made of 2 parts: first the review of the safety conformity and secondly a thorough re-examination of the safety that takes into account today's safety standards and feedback experience from similar plants. This detailed assessment of the safety aims at checking that the consequences of the different aging phenomena are well mastered for the next 10 years at least. At the end of this re-assessment, the ASN (French Nuclear Safety Authorities) decide or not the continuation of plant activity or can prescribe safety improvements. In the case of the unit 2 of the Fessenheim plant that has just finished its third decennial safety re-assessment, the ASN has prescribed the same improvements as for the unit 1, that is to say the reinforcement of the resistance to corium of the foundation raft and an improvement on the emergency cooling system. The works on the unit 1 have begun despite contestation from anti-nuclear associations that question the cost of the safety upgrading (20 to 30 millions euros) while the unit is expected to be decommissioned by end 2016. (A.C.)

  2. Unit operations used to treat process and/or waste streams at nuclear power plants

    Estimates are given of the annual amounts of each generic type of LLW [i.e., Government and commerical (fuel cycle and non-fuel cycle)] that is generated at LWR plants. Many different chemical engineering unit operations used to treat process and/or waste streams at LWR plants include adsorption, evaporation, calcination, centrifugation, compaction, crystallization, drying, filtration, incineration, reverse osmosis, and solidification of waste residues. The treatment of these various streams and the secondary wet solid wastes thus generated is described. The various treatment options for concentrates or solid wet wastes, and for dry wastes are discussed. Among the dry waste treatment methods are compaction, baling, and incineration, as well as chopping, cutting and shredding. Organic materials [liquids (e.g., oils or solvents) and/or solids], could be incinerated in most cases. The filter sludges, spent resins, and concentrated liquids (e.g., evaporator concentrates) are usually solidified in cement, or urea-formaldehyde or unsaturated polyester resins prior to burial. Incinerator ashes can also be incorporated in these binding agents. Asphalt has not yet been used. This paper presents a brief survey of operational experience at LWRs with various unit operations, including a short discussion of problems and some observations on recent trends

  3. Development of CAPE-OPEN unit operations for advanced power systems modeling

    Swensen, D.; Zitney, S.; Bockelie, M.

    2007-01-01

    Reaction Engineering International (REI) is developing a suite of CORBA CAPE-OPEN compliant unit operations to support the Department of Energy NETL Advanced Process Engineering Co-Simulation (APECS) framework for advanced power systems. One of these components will provide an interface to the GateCycle software, which is widely used in the power generation industry for process modeling. Additional CAPE-OPEN components will provide modeling capabilities of varying fidelity for equipment such as a gasifier, air separation unit, syngas cooler, solid oxide fuel cell and water-gas shift reactor. The models used in the components will be a combination of those developed by REI and proprietary models developed by members of the Project's industrial interest group.

  4. Current sharing between two vacuum circuit breaker units in parallel operation for large direct current interruption

    The inductive energy storage system (IES system) has been developed for the energy source of a fusion reactor. This paper presents the characteristics of circuit breaker units which will be used for the IES system. A small scale parallel breaking test circuit, in which two vacuum circuit breaker units are used, was constructed. The power source for the circuit was a condenser bank of 730 microfarad. The relation between arc voltage and arc current, and current wave forms in both vacuum valves operated in parallel were observed. Simulation calculation for the small scale circuit was performed. The obtained wave forms were similar to the measured forms. It was found that the current through both breakers was nearly balanced when the difference of breaking time of both breakers was small. Simulation calculation method for large scale parallel breakers was developed. Use of a series inductance of 100 microhenry will save the difference of breaking time. (Kato, T.)

  5. Pickering NGS B - Unit 6 strategy to remove fuel defects during operation at high power

    Unit 6 was operating at high power (100% FP) with all the adjuster rods (AAs) in core when Chemistry sample results of HTS I-131 activity increased from 1.65 μCi/kg (base line) to 5.4 μCi/kg. Sustained elevated activity levels and subsequently numerous significant spikes have lead to the conclusion that the Unit 6 core contains defected fuel bundles. 34 channels have been identified by Reactor Physics, as possible locations containing defective fuel bundles. Reactor Physics has developed a set of criteria, to be used in prioritizing the sequence of channel re-fuelling and defect removal. The refuelling strategy was successfully implemented in February 2009, all the suspect channels were twice fuelled and any potential defected fuel bundle was discharged by end of summer 2009. (author)

  6. Operating results in 1986 of German nuclear generating units. Pt. 2

    The 1986 operating results of the nuclear power plants of more than 1000 MW power run in the Federal Republic of Germany are reprinted in excerpts in part 2 (pt. 1: nuclear generating units of up to 1000 MW power). The top of the list, as far as electricity generation is concerned (also worldwide), is occupied by the Grohnde nuclear generating unit (1365 MWe) with 10.793 billion kWh, followed by Philippsburg KKP-2 (1349 MWe) with 10.750 billion kWh and Kruemmel KKK (1316 MWe) with 9.888 billion kWh. Nuclear power plants in the Federal Republic of Germany also attained high availabilities. The highest availability level has been recorded for the Grohnde KWG unit, i.e., 92,7% availability in terms of time and 89.7% capacity availability. KWG is followed in that respect by Stade KKS (672 MWe) with 92% and 89.2%, respectively. The THTR and Muelheim-Kaerlich plants, which are in the commissioning phase, suffered prolonged outages for licensing reasons. In 1986 there were no major safety related events in the nuclear power plants of the Federal Republic of Germany, which could be called accidents. Technical problems, some of which resulted in considerably prolonged revision outages or unscheduled outages, were encountered in the year under review especially in the turbine sector (fixed and moving blades), in the main coolant pumps of PWR plants, and the bolts of core shrouds (PWR) and feedwater spargers, respectively (BWR). Some BWR plants expanded their operating characteristics thus improving their load following behavior. After an introductory survey, the various reactors are dealt with in greater detail, including the operating diagrams for 1986. (orig./UA)

  7. Integrated Operational Taxonomic Units (IOTUs) in Echolocating Bats: A Bridge between Molecular and Traditional Taxonomy

    Galimberti, Andrea; Spada, Martina; Russo, Danilo; Mucedda, Mauro; Agnelli, Paolo; Crottini, Angelica; Ferri, Emanuele; Martinoli, Adriano; Casiraghi, Maurizio

    2012-01-01

    Background Nowadays, molecular techniques are widespread tools for the identification of biological entities. However, until very few years ago, their application to taxonomy provoked intense debates between traditional and molecular taxonomists. To prevent every kind of disagreement, it is essential to standardize taxonomic definitions. Along these lines, we introduced the concept of Integrated Operational Taxonomic Unit (IOTU). IOTUs come from the concept of Operational Taxonomic Unit (OTU) and paralleled the Molecular Operational Taxonomic Unit (MOTU). The latter is largely used as a standard in many molecular-based works (even if not always explicitly formalized). However, while MOTUs are assigned solely on molecular variation criteria, IOTUs are identified from patterns of molecular variation that are supported by at least one more taxonomic characteristic. Methodology/Principal Findings We tested the use of IOTUs on the widest DNA barcoding dataset of Italian echolocating bats species ever assembled (i.e. 31 species, 209 samples). We identified 31 molecular entities, 26 of which corresponded to the morphologically assigned species, two MOTUs and three IOTUs. Interestingly, we found three IOTUs in Myotis nattereri, one of which is a newly described lineage found only in central and southern Italy. In addition, we found a level of molecular variability within four vespertilionid species deserving further analyses. According to our scheme two of them (i.e. M. bechsteinii and Plecotus auritus) should be ranked as unconfirmed candidate species (UCS). Conclusions/Significance From a systematic point of view, IOTUs are more informative than the general concept of OTUs and the more recent MOTUs. According to information content, IOTUs are closer to species, although it is important to underline that IOTUs are not species. Overall, the use of a more precise panel of taxonomic entities increases the clarity in the systematic field and has the potential to fill the gaps

  8. Integrated operational taxonomic units (IOTUs in echolocating bats: a bridge between molecular and traditional taxonomy.

    Andrea Galimberti

    Full Text Available BACKGROUND: Nowadays, molecular techniques are widespread tools for the identification of biological entities. However, until very few years ago, their application to taxonomy provoked intense debates between traditional and molecular taxonomists. To prevent every kind of disagreement, it is essential to standardize taxonomic definitions. Along these lines, we introduced the concept of Integrated Operational Taxonomic Unit (IOTU. IOTUs come from the concept of Operational Taxonomic Unit (OTU and paralleled the Molecular Operational Taxonomic Unit (MOTU. The latter is largely used as a standard in many molecular-based works (even if not always explicitly formalized. However, while MOTUs are assigned solely on molecular variation criteria, IOTUs are identified from patterns of molecular variation that are supported by at least one more taxonomic characteristic. METHODOLOGY/PRINCIPAL FINDINGS: We tested the use of IOTUs on the widest DNA barcoding dataset of Italian echolocating bats species ever assembled (i.e. 31 species, 209 samples. We identified 31 molecular entities, 26 of which corresponded to the morphologically assigned species, two MOTUs and three IOTUs. Interestingly, we found three IOTUs in Myotis nattereri, one of which is a newly described lineage found only in central and southern Italy. In addition, we found a level of molecular variability within four vespertilionid species deserving further analyses. According to our scheme two of them (i.e. M.bechsteinii and Plecotus auritus should be ranked as unconfirmed candidate species (UCS. CONCLUSIONS/SIGNIFICANCE: From a systematic point of view, IOTUs are more informative than the general concept of OTUs and the more recent MOTUs. According to information content, IOTUs are closer to species, although it is important to underline that IOTUs are not species. Overall, the use of a more precise panel of taxonomic entities increases the clarity in the systematic field and has the potential

  9. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449 ampersand D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit

  10. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  11. Quality and productivity drive innovation and improvement at United Technologies Aerospace Operations, Inc.

    Jamar, L. G.

    1986-01-01

    Quality and innovation are the hallmarks of the national space program. In programs that preceded the Shuttle Program the emphasis was on meeting the risks and technical challenges of space with safety, quality, reliability, and success. At United Technologies Aerospace Operations, Inc. (UTAO), the battle has developed along four primary fronts. These fronts include programs to motivate and reward people, development and construction of optimized processes and facilities, implementation of specifically tailored management systems, and the application of appropriate measurement and control systems. Each of these initiatives is described. However, to put this quality and productivity program in perspective, UTAO and its role in the Shuttle Program are described first.

  12. Linear fractional composition operators on the Dirichlet space in the unit ball

    ZHOU ZeHua; YUAN Cheng

    2009-01-01

    We investigate the adjoints of linear fractional composition operators Cφ acting on classical Dirichlet space D(BN) in the unit ball BN of CN,and characterize the normality and essential normality of Cφ on:D(BN) and the Dirichlet space modulo constant function:Do (BN),where φ is a linear fractional map of BN.In addition,we also show that for any non-elliptic linear fractional map φ of BN,the composition maps σ o φ and φo σ are elliptic or parabolic linear fractional maps of BN.

  13. Linear fractional composition operators on the Dirichlet space in the unit ball

    2009-01-01

    We investigate the adjoints of linear fractional composition operators Cφ acting on classical Dirichlet space D(BN ) in the unit ball BN of CN , and characterize the normality and essential normality of Cφ on D(BN ) and the Dirichlet space modulo constant function D0(BN ), where φ is a linear fractional map of BN . In addition, we also show that for any non-elliptic linear fractional map φ of BN , the composition maps σοφ and φοσ are elliptic or parabolic linear fractional maps of BN .

  14. Operating experience and lessons learned in the United States of America

    One of the key elements for continuous improvement of ageing management is the use of OE and lessons learned during the implementation of AMPs. The document NEI 95-10 (Rev. 6), which is the basis for licence renewal evaluations for LTO in the United States of America and many other States, has identified OE as one of the ten key elements of every AMP for LTO. The OE element is described as: “Operating experience of the aging management activity, including past corrective actions resulting in program enhancements or additional programs or activities, should provide objective evidence to ensure that the effects of aging will be adequately managed so that the intended functions of the structure or component will be maintained during the period of extended operation.”

  15. Maintenance and operation of a hydroelectric unit of energy in a power system using virtual reality

    de Sousa, Marcos Paulo Alves [Federal University of Para, Faculty of Engineering Computing, Augusto Correa Street, No. 1, Belem, Para (Brazil); Emilio Goeldi Museum, Service Data Processing Department, Perimetral Avenue No. 1901, Belem, Para (Brazil); Filho, Manoel Ribeiro; Nunes, Marcus Vinicius Alves; Lopes, Andrey da Costa [Federal University of Para, Faculty of Engineering Computing, Augusto Correa Street, No. 1, Belem, Para (Brazil)

    2010-07-15

    This paper presents a new approach to training for hydroelectric unit of energy (HUE) by using virtual reality Non-immersive techniques. The software offers two modules of training: maintenance and operation. The first module, maintenance, uses the learning approach based on practice and offers different training levels, divided into three modes: automatic, guided, and exploratory, in which these modes are accessed according to the acquired degree of knowledge by the trainee in relation to maintenance procedures. The second module, allows the trainee to visualize the operation of HUE during a certain event as the electromechanical dynamics of the turbine-generator assemblage in the virtual world by the visualization of several requisite conditions before the startup-shutdown procedure of HUE. (author)

  16. 78 FR 5167 - BE-9: Quarterly Survey of Foreign Airline Operators' Revenues and Expenses in the United States

    2013-01-24

    ... Bureau of Economic Analysis XRIN 0691-XC003 BE-9: Quarterly Survey of Foreign Airline Operators' Revenues... Foreign Airline Operators' Revenues and Expenses in the United States (BE-9). This mandatory survey is..., agents, or other representatives of foreign airline operators that transport passengers or freight...

  17. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K{trademark} resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well.

  18. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  19. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  20. Overview of the Habitat Demonstration Unit Power System Integration and Operation at Desert RATS 2010

    Colozza, Anthony J.; George, Pat; Gambrell, Ronnie; Chapman, Chris

    2013-01-01

    A habitat demonstration unit (HDU) was constructed at NASA Johnson Space Center (JSC) and designed by a multicenter NASA team led out of NASA Kennedy Space Center (KSC). The HDU was subsequently utilized at the 2010 Desert Research and Technology Studies (RATS) program held at the Black Point Lava Flow in Arizona. This report describes the power system design, installation and operation for the HDU. The requirements for the power system were to provide 120 VAC, 28 VDC, and 120 VDC power to the various loads within the HDU. It also needed to be capable of providing power control and real-time operational data on the load's power consumption. The power system had to be capable of operating off of a 3 phase 480 VAC generator as well as 2 solar photovoltaic (PV) power systems. The system operated well during the 2 week Desert RATS campaign and met all of the main goals of the system. The power system is being further developed to meet the future needs of the HDU and options for this further development are discussed.

  1. Operational Experience with Long Duration Wildfire Mapping: UAS Missions Over the Western United States

    Hall, Philip; Cobleigh, Brent; Buoni, Greg; Howell, Kathleen

    2008-01-01

    The National Aeronautics and Space Administration, United States Forest Service, and National Interagency Fire Center have developed a partnership to develop and demonstrate technology to improve airborne wildfire imaging and data dissemination. In the summer of 2007, a multi-spectral infrared scanner was integrated into NASA's Ikhana Unmanned Aircraft System (UAS) (a General Atomics Predator-B) and launched on four long duration wildfire mapping demonstration missions covering eight western states. Extensive safety analysis, contingency planning, and mission coordination were key to securing an FAA certificate of authorization (COA) to operate in the national airspace. Infrared images were autonomously geo-rectified, transmitted to the ground station by satellite communications, and networked to fire incident commanders within 15 minutes of acquisition. Close coordination with air traffic control ensured a safe operation, and allowed real-time redirection around inclement weather and other minor changes to the flight plan. All objectives of the mission demonstrations were achieved. In late October, wind-driven wildfires erupted in five southern California counties. State and national emergency operations agencies requested Ikhana to help assess and manage the wildfires. Four additional missions were launched over a 5-day period, with near realtime images delivered to multiple emergency operations centers and fire incident commands managing 10 fires.

  2. Solving optimum operation of single pump unit problem with ant colony optimization (ACO) algorithm

    For pumping stations, the effective scheduling of daily pump operations from solutions to the optimum design operation problem is one of the greatest potential areas for energy cost-savings, there are some difficulties in solving this problem with traditional optimization methods due to the multimodality of the solution region. In this case, an ACO model for optimum operation of pumping unit is proposed and the solution method by ants searching is presented by rationally setting the object function and constrained conditions. A weighted directed graph was constructed and feasible solutions may be found by iteratively searching of artificial ants, and then the optimal solution can be obtained by applying the rule of state transition and the pheromone updating. An example calculation was conducted and the minimum cost was found as 4.9979. The result of ant colony algorithm was compared with the result from dynamic programming or evolutionary solving method in commercial software under the same discrete condition. The result of ACO is better and the computing time is shorter which indicates that ACO algorithm can provide a high application value to the field of optimal operation of pumping stations and related fields.

  3. Operational reliability statistical analysis of WWER -1000 reactors electric pump units CN 60-180 by kernel estimation methods

    The article deals with the processing of statistical information on pump units CN 60-180 failures during operation. Pump units CN 60-180 are part of the regular equipment of WWER-1000 reactors. The information for the analysis was obtained from VNIIAEhS branch database. The object operation observation period is 01.01.1990 - 31.12.2007. The statistical data processing was carried out with nonparametric estimation method named kernel estimation. Such pump units reliability characteristic estimates, as probability density and distribution function of failure time, probability of no-failure operation and failure rate were obtained. The work results are used for NPP control

  4. Phase I and II feasibility study report for the 300-FF-5 operable unit

    The purpose of this Phase I/II feasibility study is to assemble and screen a list of alternatives for remediation of the 300-FF-5 operable site on the Hanford Reservation. This screening is based on information gathered in the Phase I Remedial Investigation (RI) and on currently available information on remediation technologies. The alternatives remaining after screening provide a range of response actions for remediation. In addition, key data needs are identified for collection during a Phase II RI (if necessary). This Phase I/II FS represents a primary document as defined by the Tri-Party Agreement, but will be followed by a Phase III FS that will further develop the alternatives and provide a detailed evaluation of them. The following remedial action objectives were identified for the 300-FF-5 operable unit: Limit current human exposure to contaminated groundwater in the unit; Limit discharge of contaminated groundwater to the Columbia River; Reduce contaminant concentrations in groundwater below acceptable levels by the year 2018

  5. Phase report 1C, TA-21 operable unit RCRA Facility Investigation, Outfalls Investigation

    This phase report summarizes the results of field investigations conducted in 1992 at Technical Area 21 of Los Alamos National Laboratory, as prescribed by the RCRA Facility Investigation work plan for the Technical Area 21 operable unit (also known as OU 1106). This phase report is the last part of a three-part phase report describing the results of field work conducted in 1992 at this operable unit. Phase Report lA, issued on l4 June l993, summarized site geologic characterization activities. Phase report 1B, issued on 28 January 1994, included an assessment of site-wide surface soil background, airborne emissions deposition, and contamination in the locations of two former air filtration buildings. The investigations assessed in Phase Report 1C include field radiation surveys and surface and near-surface sampling to characterize potential contamination at 25 outfalls and septic systems listed as SWMUs in the RFI work plan. Based on the RFI data, it is recommended that no further action is warranted for 8 SWMUs and further action is recommended for 3 SWMUs addressed in this phase report. For 14 SWMUs which represent no immediate threat to human health or environment, deferral of further action/no further action decisions is recommended until outstanding analytical data are received, sampling of adjacent SWMUs is completed, or decisions are made about the baseline risk assessment approach

  6. Current Conditions Risk Assessment for the 300-FF-5 Groundwater Operable Unit

    Miley, Terri B.; Bunn, Amoret L.; Napier, Bruce A.; Peterson, Robert E.; Becker, James M.

    2007-11-01

    This report updates a baseline risk assessment for the 300 Area prepared in 1994. The update includes consideration of changes in contaminants of interest and in the environment that have occurred during the period of interim remedial action, i.e., 1996 to the present, as well as the sub-regions, for which no initial risk assessments have been conducted. In 1996, a record of decision (ROD) stipulated interim remedial action for groundwater affected by releases from 300 Area sources, as follows: (a) continued monitoring of groundwater that is contaminated above health-based levels to ensure that concentrations continue to decrease, and (b) institutional controls to ensure that groundwater use is restricted to prevent unacceptable exposure to groundwater contamination. In 2000, the groundwater beneath the two outlying sub-regions was added to the operable unit. In 2001, the first 5-year review of the ROD found that the interim remedy and remedial action objectives were still appropriate, although the review called for additional characterization activities. This report includes a current conditions baseline ecological and human health risk assessment using maximum concentrations in the environmental media of the 300-FF-5 Operable Unit and downstream conditions at the City of Richland, Washington. The scope for this assessment includes only current measured environmental concentrations and current use scenarios. Future environmental concentrations and future land uses are not considered in this assessment.

  7. Preliminary remedial action objectives for the Tank 16 groundwater operable unit

    Tank 16 is a High Level Radioactive Waste tank in the H-Area Tank Farm on the Savannah River Site that was placed into service in May 1959. A leak was detected in one of the construction weld joints while the tank was being filled. Before jet evacuation of the tank waste was completed, the leak overflowed the annulus pan and an estimated 16 to 700 gallons of waste escaped to the environment (soil and groundwater) over a six hour period contaminating approximately 1,600--70,000 cubic feet of soil with up to 5000 curies of activity (principally Cs137). The Tank 16 bottom is constructed below the groundwater table which resulted in almost immediate contamination of that medium. Low groundwater flow rates, the ion exchange property of adjacent soils, and the distance to the nearest surface water bodies (1,500 to 8,000 feet) indicates that surface water and sediment outcrop of contaminates may be expected between 44 and 530 years (Poe et al., 1974). Remedial action objectives consist of medium-specific and operable unit specific goals for protecting human health and the environment. These objectives are specific and do not limit the range of alternatives that may be developed.A range of remedial technologies, which provides for treatment, containment, and removal requirements of contaminated media remaining at the Tank 16 groundwater operable unit, is identified and developed for each general response action

  8. Phase report 1C, TA-21 operable unit RCRA Facility Investigation, Outfalls Investigation

    1994-02-28

    This phase report summarizes the results of field investigations conducted in 1992 at Technical Area 21 of Los Alamos National Laboratory, as prescribed by the RCRA Facility Investigation work plan for the Technical Area 21 operable unit (also known as OU 1106). This phase report is the last part of a three-part phase report describing the results of field work conducted in 1992 at this operable unit. Phase Report lA, issued on l4 June l993, summarized site geologic characterization activities. Phase report 1B, issued on 28 January 1994, included an assessment of site-wide surface soil background, airborne emissions deposition, and contamination in the locations of two former air filtration buildings. The investigations assessed in Phase Report 1C include field radiation surveys and surface and near-surface sampling to characterize potential contamination at 25 outfalls and septic systems listed as SWMUs in the RFI work plan. Based on the RFI data, it is recommended that no further action is warranted for 8 SWMUs and further action is recommended for 3 SWMUs addressed in this phase report. For 14 SWMUs which represent no immediate threat to human health or environment, deferral of further action/no further action decisions is recommended until outstanding analytical data are received, sampling of adjacent SWMUs is completed, or decisions are made about the baseline risk assessment approach.

  9. Combined operation of AC and DC distribution system with distributed generation units

    This paper presents a DC distribution system which has been supplied by external AC systems as well as local DG units in order to demonstrate an overall solution to power quality issue. In this paper, the proposed operation method is demonstrated by simulation of power transfer between external AC systems, DG units, AC and DC loads. The power flow control in DC distribution system has been achieved by network converters and DG converters. Also, the mathematical model of the network, DG and load converters are obtained by using the average technique, which allows converter systems accurately simulated and control strategies for this converters is achieved. A suitable control strategy for network converters has been proposed that involves DC voltage droop regulator and novel instantaneous power regulation scheme. Also, a novel control technique has been proposed for DG converters. In this paper, a novel control system based on stationary and synchronously rotating reference frame has been proposed for load converters for supplying AC loads connected to the DC bus by balanced voltages. The several case studies have been studied based on proposed methods. The simulation results show that DC distribution systems including DG units can improve the power quality at the point of common coupling (PCC) in the power distribution system or industrial power system. (authors)

  10. The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2

    Lee, J.R.; Heo, T.Y.; Cho, B.H. [Korea Electric Power Research Institute, Taejeon (Korea, Republic of); Kang, T.G.; Kim, H.M.; Kim, Y.S.; Oh, S.M.; Kang, Y.S. [Korea Electric Power Data Network Co., Seoul (Korea, Republic of)

    1997-12-31

    Due to aging of the imported seismic monitoring system of Uljin of t 1 and 2 units it is difficult for this system to provide enough functions needed for the security of seismic safety and the evaluation of the earthquake data from the seismic instrumentation. For this reason, it is necessary to replace the seismic monitoring system of Uljin 1 and 2 units with a new system which has the localized and upgraded hardware and corresponding software. In the part of standardization of existing seismic monitoring system, furthermore, it is necessary to develop the seismic wave analysis system which incorporate newly developed software and can real-timely analyze the seismic wave. This report is the finial product of research project ``The development of the operational program for seismic monitoring system of Uljin Unit 1 and 2`` which have been performed from June 1996 to June 1997 by KEPRI and KDN. Main accomplishments - Review of regulatory criteria for seismic monitoring system -Analysis and upgrade of hardware system -Analysis and upgrade of software system - Development of seismic wave analysis system. (author). 17 refs., 49 figs., 6 tabs.