AAR in concrete of Asejire spillway (OYO state - Nigeria)  

Energy Technology Data Exchange (ETDEWEB)

The Asejire dam at Ibadan, Nigeria was constructed in the late sixties for the purpose of providing water for the city of Ibadan (presently about 4,5 million inhabitants). It is located on the Oshun river approximately fifteen miles from the city. In 1982 cracks were observed on the wing walls and although these continued to develop, no attempt was made at that time to investigate their causes and no repair was carried out. In 1989 the SGI ENGINEERING Group of Geneva, Switzerland was appointed as the consultant for the complete refurbishment of the Asejire water scheme. The consortium Degremont-Poat-Clemessy was awarded the contract for the project. The African Development Bank and the Nigerian Government have provided the loan to finance the project.

1995-12-31

3

Management of dams for the next Millennium: proceedings of the 1999 Canadian Dam Association  

Energy Technology Data Exchange (ETDEWEB)

The meeting featured seven sessions with 18 papers abstracted/indexed therein as follows: keynote address: tailings dams safety - implications for the dam safety community; 1 - design and performance: performance monitoring of dams: are we doing what we should be doing?; tailings dams from the perspective of conventional dam engineering; and design overview of Syncrude's Mildred Lake east toe berm; 2 - design and modelling: use of a 2D model for a dam break study on the ALCAN hydroelectric complex in Quebec; and spillway design implications resulting from changes in rainfall extremes; 3 - risk and dam safety I: closing the gaps in the dam safety guidelines; the reality of life safety consequence classification; and surveillance practices for the next millenium; 4 - risk and dam safety II: quantitative risk-assessment using the capacity-demand analysis; and new guidelines for dam safety classification; 5 - millenium issues: expectations of immortality, dam ...

1999-07-01

4

Uranium studies in the Tims Branch and Steed Pond system  

Energy Technology Data Exchange (ETDEWEB)

During the weekend of September 2--3, 1984, a part of the wooden spillway for Steed Pond gave way and the pond slowly drained. Consideration is being given to leaving Steed Pond dry. Steed Pond has accumulated some of the uranium discharged from 300 Area operations and past surveys have shown that the uranium concentration in the sediments ranges between 20 and 531 pCi/gm. The recently completed aerial survey of the exposed area of Steed Pond showed that the uranium was widely spread in the sediments of Steed Pond. Until ground cover is established over the exposed pond sediments, they will be subject to erosion. As much as 90 tons of sediment could be eroded from the exposed sediments in Steed Pond the first year, but the erosion could be reduced to 5--15 tons by establishing a ground cover such as rye grass. Only about 40% of the eroded sediment would be delivered to Upper Three Runs Creek, because most of the eroded sediment deposited before it reaches Upper ...

1984-11-01

5

Generalized simulation model for reservoir system analysis. Technical paper  

Energy Technology Data Exchange (ETDEWEB)

This paper overviews the general features of computer program 'HEC-5, Simulation of Flood Control and Conservation Systems', with emphasis on the capabilities of the most recent release of HEC-5, Version 7.2, dated March 1991. HEC-5 can simulate the essential features and operation goals and constraints of simple or complex systems with simulation intervals ranging from minutes to one month. Single event flood analysis and period of record conservation analysis may be accomplished with the model. Flood control analysis includes balanced system operation for downstream damage centers with consideration of forecasted local flows and hydrologic routing. In addition, induced surcharge operation based on spillway gate regulation schedules can be simulated. Hydropower analysis may include run-of-river, peaking, and pumped storage plants as well as system power operation. Water supply simulation can include reservoir and downstream flow requirements in ...

1992-03-01